Skip to content
Back to announcement

20260427_SMII_Laporan Informasi dan Fakta Material_32074302_lamp6.pdf

Other Text extracted SMII

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 39

Page 1

          
Page 2

          
Page 3
              2025
LAPORAN PENDANAAN BERKELANJUTAN
         Sustainable Funding Report
Page 4
Kata Pengantar
Welcoming Remarks




             2 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 5
Daftar Isi
Table of Contents



  4-7 Kata Pengantar                                            20-22 Estimasi Dampak
         Welcoming Remarks                                                      Lingkungan dan Sosial
                                                                                Estimated Environmental
                                                                                and Social Impact
  8-12 Tentang PT SMI
         About PT SMI




                                                                23-29 Profil Proyek
                                                                                Project Profile




 13-15 Kerangka Pendanaan
         Berkelanjutan
         Sustainable Funding
         Framework



    16   Realisasi Pendanaan
         Berdasarkan Kerangka
         Pendanaan Berkelanjutan
         PT SMI
         Sustainable Funding Under
         PT SMI’s Sustainable Funding                            30-31 Pendekatan
         Framework                                                              Pelaporan Dampak
                                                                                Impact Reporting
                                                                                Approach

 17-19 Obligasi Keberlanjutan
         Berkelanjutan I Sarana Multi
         Infrastruktur Tahap I
         Tahun 2025
         Shelf Registration
         Sustainability Bond I Sarana
         Multi Infrastruktur Phase I
         Year 2025




                                    PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |   3
Page 6
   Kata Pengantar
   Welcoming Remarks




                                                                                              Kata Pengantar
                                                                                              Welcoming Remarks


                                                                                              Reynaldi
                                                                                              Hermansjah
                                                                                              Direktur Utama
                                                                                              President Director




PT Sarana Multi Infrastruktur (Persero) (“PT SMI” atau                            PT Sarana Multi Infrastruktur (Persero) (“PT SMI” or the
“Perseroan”) sebagai Special Mission Vehicle (SMV) di bawah                       “Company”), as a Special Mission Vehicle (SMV) under the
Kementerian Keuangan Republik Indonesia terus menjalankan                         Ministry of Finance of the Republic of Indonesia, continues to
mandatnya sebagai agen pembangunan berkelanjutan                                  fulfill its mandate as an agent of sustainable development,
dalam meningkatkan kesejahteraan bangsa. Seiring dengan                           contributing to the enhancement of national welfare. In
meningkatnya kebutuhan pendanaan pembangunan yang                                 response to the increasing demand for financing that
selaras dengan prinsip lingkungan, sosial, dan tata kelola                        aligns with Environmental, Social, and Governance (ESG)
(Environmental, Social, and Governance / ESG) Perseroan                           principles, the Company has consistently strengthened
secara konsisten mengembangkan peran strategisnya                                 its strategic role in mobilizing sustainable funding.
dalam menghimpun pendanaan yang berorientasi pada
aspek keberlanjutan.

Pendanaan tematik merupakan salah satu strategi utama                             Thematic funding represents a core pillar of the Company’s
pendanaan berkelanjutan Perseroan. Pendekatan ini                                 sustainable funding strategy. This approach is designed to
dirancang untuk memastikan keterkaitan yang jelas dan                             ensure a clear, transparent, and measurable linkage between
terukur antara sumber pendanaan yang dihimpun dengan                              the funds raised and their allocation (use of proceeds),
realisasi penggunaan dana (use of proceeds), khususnya                            particularly in supporting eligible social and environmental
untuk mendukung proyek-proyek infrastruktur sosial dan                            infrastructure projects. The strategy is aligned with the
lingkungan. Strategi tersebut sejalan dengan pencapaian                           achievement of the Sustainable Development Goals (SDGs)
Tujuan      Pembangunan      Berkelanjutan   (Sustainable                         and supports the Government of Indonesia’s commitment
Development Goals / SDGs) serta komitmen Pemerintah                               to achieving Net Zero Emissions by 2060. Through prudent,
Indonesia menuju target Net Zero Emission pada tahun                              disciplined, and innovative financial management, the
2060. Melalui pengelolaan pendanaan yang prudent dan                              Company continues to deliver meaningful contributions
inovatif, Perseroan memberikan kontribusi nyata terhadap                          to inclusive and sustainable national development.
pembangunan nasional yang inklusif dan berkelanjutan.

Sebagai wujud atas komitmen tersebut, Perseroan secara                            In implementing its mandate, the Company has continuously
aktif mengembangkan dan mendiversifikasi instrumen                                advanced and diversified its sustainable financing
pendanaan berkelanjutan. Pada tahun 2018, Perseroan                               instruments. In 2018, the Company marked a significant
menerbitkan Obligasi Berlandaskan Lingkungan (Green Bond)                         milestone by issuing Indonesia’s first corporate Green Bond,
korporasi pertama di Indonesia senilai Rp500 miliar, yang                         amounting to IDR 500 billion, as part of its Green Bond I Shelf
merupakan bagian dari Penawaran Umum Berkelanjutan                                Registration program with a total program size of IDR 3 trillion.
(PUB) Green Bond I dengan nominal sebesar Rp3 triliun.                            The proceeds from this issuance have been fully allocated
Seluruh dana hasil penerbitan tersebut telah disalurkan untuk                     to finance environmentally sustainable infrastructure
mendukung proyek-proyek infrastruktur ramah lingkungan.                           projects. Building on this foundation, the Company further
Selanjutnya, Perseroan memperoleh pinjaman sindikasi luar                         strengthened its sustainable financing portfolio through the
negeri berupa Sustainability-linked Syndicated Term Loan                          successful arrangement of offshore Sustainability-Linked
Facility (SLL) pada tahun 2023 dan 2025.                                          Syndicated Term Loan Facilities (SLL) in 2023 and 2025.




                4 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 7
                                                                                                                                 Kata Pengantar
                                                                                                                                 Welcoming Remarks




Pada tahun 2025, PT SMI telah meluncurkan Sustainable               In 2025, as part of its ongoing commitment to sustainability,
Funding Framework sebagai acuan dalam penghimpunan                  PT SMI established the Sustainable Funding Framework as a
pendanaan berkelanjutan. Kerangka ini memastikan                    key reference for raising sustainable financing. The Framework
keselarasan   antara  strategi pendanaan    Perseroan               ensures alignment between the Company’s funding
dengan tujuan keberlanjutan, sekaligus menjadi dasar                strategy and its sustainability objectives, while providing
dalam pengembangan berbagai instrumen pendanaan                     a robust foundation for the development of transparent,
berkelanjutan yang transparan dan berorientasi pada                 credible, and impact-driven financing instruments.
dampak.

Fasilitas pendanaan ini mengaitkan struktur pendanaan               In the same year, the Company also issued its inaugural
dengan pencapaian indikator kinerja keberlanjutan Perseroan.        Sustainability Bond amounting to IDR 600 billion,
Pada tahun 2025, Perseroan juga menerbitkan Obligasi                as a strategic step to expand access to thematic
Keberlanjutan (Sustainability Bond) pertamanya sebesar              funding from the domestic capital market and further
Rp600 miliar, sebagai langkah strategis dalam memperluas            reinforce its commitment to sustainable finance.
akses pendanaan tematik dari pasar modal domestik.

Rangkaian inisiatif pendanaan tersebut mencerminkan                 These initiatives underscore the Company’s evolving
peran Perseroan tidak hanya sebagai perusahaan                      role—not only as an infrastructure financing institution,
pembiayaan infrastruktur, tetapi juga sebagai pengelola             but also as a credible, transparent, and impact-driven
pendanaan pembangunan yang kredibel, transparan, dan                development financier. The Company remains committed
berorientasi pada dampak. Perseroan memastikan bahwa                to ensuring that all sustainable funding raised, managed,
seluruh pendanaan berkelanjutan yang dihimpun, dikelola,            and allocated is in full compliance with sustainability
dan disalurkan sesuai dengan prinsip keberlanjutan serta            principles  and     applicable   laws   and    regulations.
ketentuan peraturan perundang-undangan yang berlaku.

Laporan      Pendanaan     Berkelanjutan ini    disusun             This Sustainable Funding Report is presented as part of the
sebagai bentuk transparansi dan pertanggungjawaban                  Company’s commitment to transparency and accountability
Perseroan atas pelaksanaan pendanaan berkelanjutan.                 in the implementation of sustainable financing. It provides
Laporan ini menyajikan gambaran mengenai strategi,                  a comprehensive overview of the Company’s strategy,
implementasi, serta pengelolaan pendanaan berkelanjutan             implementation, and management of sustainable funding,
Perseroan, sekaligus menjadi sarana komunikasi kepada               while also serving as a key communication to regulators,
regulator, investor, dan seluruh pemangku kepentingan               investors, and stakeholders regarding the Company’s
mengenai komitmen Perseroan dalam mendukung                         commitment to supporting sustainable national development.
pembangunan nasional yang berkelanjutan.

Akhir kata, kami menyampaikan apresiasi setinggi-tingginya          On behalf of the Company, I would like to extend our highest
kepada Kementerian Keuangan Republik Indonesia selaku               appreciation to the Ministry of Finance of the Republic of
Pemegang Saham Perseroan, Otoritas Jasa Keuangan                    Indonesia as our shareholder, the Financial Services Authority
(OJK), Bursa Efek Indonesia (BEI), serta seluruh investor dan       (OJK), the Indonesia Stock Exchange (IDX), as well as all
pemangku kepentingan atas kepercayaan dan dukungan                  investors and stakeholders, for their continued trust
yang terus diberikan.                                               and support.

Ke   depan,    Perseroan   berkomitmen     untuk   terus            Looking    ahead,      the    Company      remains   highly
mengembangkan       pendanaan    berkelanjutan   tematik            commited to further advancing thematic sustainable
sebagai bagian dari kontribusi nyata dalam mewujudkan               funding as a tangible contribution to fostering
pembangunan Indonesia yang berkelanjutan, inklusif, dan             a sustainable, inclusive, and competitive Indonesia.
berdaya saing.


                                                    Jakarta, April 2026
                                                     Jakarta, April 2026
                                                    Mewakili Direksi,
                                                  On behalf of Directors,




                                            Reynaldi Hermansjah
                                                      Direktur Utama
                                                     President Director


                                                PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |    5
Page 8
  Tentang PT SMI
  About PT SMI




Tentang PT SMI
About PT SMI



                                                                                                  Struktur PT SMI
                                                                                                 Structure of PT SMI




                       Visi                       Vision

                              “Menjadi agen pembangunan                                            Pemerintah Negara
                                                                                                   Republik Indonesia
                              berkelanjutan untuk meningkatkan                                   Government of Indonesia

                              kesejahteraan bangsa”
                              “A sustainable development agent dedicated
                              to enhancing the nation’s welfare”
                                                                                                   Pemegang Saham
                                                                                                       Shareholder



                       MISI                          Mission                                     100%
                                                                                                 Kementerian Keuangan
                              Menjadi katalis kuat dalam meningkatkan                              Republik Indonesia
                              kesejahteraan bangsa.                                                Ministry of Finance
                              To be a strong catalyst in enhancing                                Republic of Indonesia
                              the nation’s welfare.

                              Menjadi mitra terpercaya dalam mewujudkan
                              aspirasi pembangunan bangsa yang inklusif dan
                              berkelanjutan.
                              To be a trusted partner in realizing the nation’s
                              aspirations for inclusive and sustainable
                              development.


                              Menjadi driver unggulan dalam mengakselerasi
                              pembangunan infrastruktur.
                              To be a leading driver in accelerating
                              infrastructure development.



                                                                                                       PT Indonesia
                                                                                                  Infrastructure Finance


                                                                                                 44,99%


                   6 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 9
                                                                                                                             Tentang PT SMI
                                                                                                                             About PT SMI




                                                        PT SMI berperan sebagai agen pembangunan
                                                        berkelanjutan untuk meningkatkan
                                                        kesejahteraan bangsa.

                                                        PT SMI as a sustainable development agent
                                                        dedicated to enhancing the nation’s welfare.




PT Sarana Multi Infrastruktur (Persero) (PT SMI)            PT Sarana Multi Infrastruktur (Persero) (PT SMI) was
didirikan dengan mandat sebagai perusahaan                  established with a mandate to be an Infrastructure
pembiayaan infrastruktur dan alat fiskal pemerintah         Financing company and fiscal tools in accelerating
dalam percepatan pembangunan infrastruktur di               infrastructure development in Indonesia, including
Indonesia, termasuk mendukung pelaksanaan skema             to support the implementation of the Public-Private
Kerjasama Pemerintah dan Badan Usaha (“KPBU”).              Partnership (“PPP”) scheme.

Dengan perluasan mandat yang diberikan oleh                 Following the expansion of its mandate by the
Pemerintah Indonesia melalui Peraturan Pemerintah           Government of Indonesia through Government
(PP) Nomor 53 Tahun 2020, yang memperbarui                  Regulation (PP) No. 53 of 2020, amending the
PP Pendirian Perseroan (PP 66/2007), serta                  Company’s Establishment Regulation (PP 66/2007),
diberlakukannya Peraturan Otoritas Jasa Keuangan            and the enactment of Financial Services Authority
(POJK) Nomor 46/POJK.05/2020 yang menggantikan              Regulation (POJK) No. 46/POJK.05/2020, which
Peraturan Menteri Keuangan (PMK) Nomor 100/                 replaced Minister of Finance Regulation (PMK) No.
PMK.010/2009, cakupan operasi PT SMI sebagai                100/PMK.010/2009, the scope of PT SMI’s operations
Perusahaan Pembiayaan Infrastruktur semakin                 as an Infrastructure Financing Company has been
diperjelas.                                                 further clarified.

Selanjutnya, POJK tersebut tidak lagi berlaku bagi          Subsequently, this POJK is no longer applicable
Perseroan dan telah diperbarui melalui penerbitan           to the Company and has been updated through
POJK Nomor 16 Tahun 2024, seiring dengan berlakunya         the issuance of POJK No. 16 of 2024, in line with the
Undang-Undang Nomor 4 Tahun 2023 tentang                    enactment of Law No. 4 of 2023 on the Development
Pengembangan dan Penguatan Sektor Keuangan.                 and Strengthening of the Financial Sector. This
Regulasi ini menegaskan bahwa PT SMI merupakan              regulation affirms that PT SMI is a government-owned
perusahaan pembiayaan khusus milik Pemerintah               special financing institution and is not included within
yang tidak termasuk dalam ruang lingkup usaha jasa          the scope of financing services business activities.
pembiayaan.

Ketentuan tersebut semakin memperkuat peran PT SMI          These provisions further strengthen PT SMI’s role
dalam menyediakan solusi inovatif untuk mendukung           in providing innovative solutions to support the
percepatan pembangunan infrastruktur yang ramah             acceleration    of   environmentally   sustainable
lingkungan, sekaligus mendorong pencapaian Tujuan           infrastructure development, while also contributing
Pembangunan Berkelanjutan (TPB) di Indonesia.               to the achievement of the Sustainable Development
                                                            Goals (SDGs) in Indonesia.




                                        PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |   7
Page 10
Tentang PT SMI
About PT SMI




                                                       Pelaksanaan Mandat PT SMI Sebagai
                                                         Development Finance Institution
                                      PT SMI’s Mandate as a Development Finance Institution


                                                 i
                                               om
                                                   n




                                                                                                    M
                                                 ko




                                                                                                     an
                                               nE




                                                                                                       aje
                               anfaat Sosial da




                                                                                                          me
                                                                                                            n Risiko yang
                              M




                                                                                                                          T
                           si




                                                                                                                           eru
                         sa




                                                                                                                              k
                       li




                                                                                                                               ur
                      a
                     m




                                                 pti
                                                O

       1                                                     2                                  3
     Institusi terpercaya dengan                            Produk pembiayaan yang             Menjalankan fungsi
     mandat dan dukungan                                    inovatif, unik, dan fleksibel.     enabler bagi percepatan
     kuat dari pemerintah.                                                                     pembangunan infrastruktur.
     Trustworthy institution with                           Innovative, unique, and            Acts as an enabler that
     mandate and strong                                     flexible financing products.       accelerates infrastructure
     government support.                                                                       development by




      4                                                      5                                  6
     Optimalisasi bantuan dan                               Pionir penerbitan Green Bond       Lembaga non-pemerintah
     kerjasama strategis.                                   di Indonesia.                      pertama di Asia Tenggara yang
                                                                                               terakreditasi oleh Green Climate
                                                                                               Fund (GCF).
     Optimization of strategic                              A pioneer in issuing               The first private institution in
     partnership and technical                              corporate green bond               Southeast Asia accredited by
     assistance.                                            in Indonesia.                      Green Climate Fund (GCF).




                 8 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 11
                                                                                                                                                                                                   Tentang PT SMI
                                                                                                                                                                                                   About PT SMI




                        Pilar Bisnis / Business Pillars                                                                       Sektor Infrastruktur / Infrastructure Sector


                                                                                                                            Transportasi              Jalan              Pengairan           Telekomunikasi
        Pembiayaan                                Pembiayaan                         Jasa konsultasi &                                                                                         & Infromatika
                                                                                                                            Transportation             Road               Irrigation
         Korporasi                                   Publik                       Pengembangan Proyek
                                                                                                                                                                                           Telecommunication
         Corporate                                   Public                         Advisory and Project                                                                                      & informatics
         Financing                                 Financing                            Preparation
• Korporasi (BUMN & Swasta • Pemerintah Daereah,                                • Finansial & investment
  
                                           
                                                                                   
  Corporate (SOE & private)                BLU, BLUD, BUMD dan                     advisory
                                           institusi publik lainnya                Financial & investment
• Pembiayaan konvesional,                  Municipal government,                   advisory                                  SDA air, air           Manajemen                                   Minyak & gas
  
  syariah dan berkelanjutan                public service entity,                                                          minum & irigasi         persampahan           Air limbah                bumi
  Conventional, sharia dan                 regional public service              • Financial arranger                       Water resources,          Waste             Wastewater            Oil & natural gas

                                                                                   
  sustainable loan                         entity, regional owned                  Financial arranger
                                                                                                                           drinking water &        Management
• Equity investment                        enterprise and other
                                           public institutions
                                                                                • Pengembalian proyek                          irrigation
  
                                                                                   
  Equity investment                                                                KPBU

• Instrumen pembiayaan                  • Pembiayaan                               Public Private Partnership
                                                                                   (PPP) development
                                           
                                           konvensional, syariah
  
  inovatif lainnya
                                           dan berkelanjutan
  Other innovative loans
                                           Conventional, sharia
                                                                                • Dukungan teknis,                           Kendaraan                                                       Ketenagalistrikan,
                                                                                   
                                                                                   capacity building dan
                                           and sustainable loan                                                            bermotor listrik                              Bangunan            energi terbarukan
                                                                                   pendampingan                                                    Rolling stock
                                                                                                                           berbasis baterai                               negara            & konservasi energi
                                        • Fokus pada dampak                        Technical assistance,
                                                                                                                            Baterai based          Rolling stock       Government          Electricity, renewable
                                                                                   capacity building and
                                           
                                           pembangunan & sosial
                                                                                   others assistance                        electric motor                               building             energy & energy
                                           Focus on development
                                                                                                                               vehicles                                                        conservation
                                           and social mission



       Ringkasan Finansial Per 31 Desember 2025                                                                               Infrastruktur Sosial / Sosial Infrastructure
        Financial Highlight as of December 2025

      Aset*                                                      Ekuitas*
                                                                                                                                                                   Sarana & prasarana
      Aset*                                                      Equity*                                                                                              olahraga dan               Perumahan
                                                                                                                             Kesehatan              Pendidikan           kesenian                  rakyat
      Desember                   Desember                        Desember                        Desember                      Health               Education         Sport and arts            Public housing
      2024                       2025                            2024                            2025                                                                   facilities &

           120,1                      121,3                           43,8                            46,4
      Rp                         Rp                              Rp                              Rp                                                                   infrastructure

           Triliun                    Triliun                         Triliun                         Triliun
       USD
             7.4       Billion
                                 USD
                                       7.2         Billion
                                                                 USD
                                                                        2.7       Billion
                                                                                                 USD
                                                                                                       2.8       Billion
                                                                                                                                                                                               Kawasan &
                                                                                                                              Lembaga
                                                                                                                           pemasyarakatan           Pariwisata           Perkotaan          ekosistem industri
                                                                                                                             Correctional            Tourism             Urban city           Industrial areas
      Komitmen                                                   Portofolio Pembiayaan                                       institutions                                                      & ecosystems
      Commitment                                                 dan Investasi
                                                                 Finance and
                                                                 Investment Portfolio

      Desember                   Desember                        Desember                        Desember                                Peringkat Kredit Credit Rating
      2024                       2025                            2024                            2025                          Domestik /Domestic                    Internasional /International
      Rp
           148,9                 Rp
                                      168,7                      Rp
                                                                      96,3                       Rp
                                                                                                      94,9                     PEFINDO                                Fitch Ratings
           Triliun                    Triliun                         Triliun                         Triliun
                                                                                                                               idAAA                                  BBB
       USD
             9.2       Billion
                                 USD
                                       10       Billion
                                                                 USD
                                                                        5.9       Billion
                                                                                                 USD
                                                                                                       5.6       Billion
                                                                                                                                (outlook stable)                      (outlook negative)


                                                                                                                               Fitch Ratings                          Moody’s Ratings

                                                                                                                               AAAidn                                 Baa2
      Nilai Proyek                                               Surat Utang                                                   (outlook stable)                       (outlook negative)

      yang dibiayai                                              Diterbitkan*
      Project Cost                                               Debt Securities


                                                                                                                                                                         38,76x
      Financed                                                   Issued*
      Desember
      2024
                                 Desember
                                 2025
                                                                 Desember
                                                                 2024
                                                                                                 Desember
                                                                                                 2025                             8,9x
      Rp
           1.153
           Triliun
                                 Rp
                                      1.183
                                      Triliun
                                                                 Rp
                                                                      50,5                       Rp
                                                                                                      60,6                    Multiplier Ekonomi terhadap                         Multiplier effect
                                                                      Triliun                         Triliun                  Total Komitmen Kumulatif                       terhadap Modal Disetor

             72.7                      70.5
                                                                                                                                      Pembiayaan
                                                                        3.1                            3.6
       USD                       USD                             USD                             USD                                                                              Multiplier Effect to
                                                                                Billion                          Billion         Economic Multiplier to                            Paid-up Capital
             Billion                    Billion
                                                                                                                                 Financing Cumulative




      Outstanding                                         Desember 2024                   Desember 2025
                                                                                                                                 Wajar Tanpa Pengecualian / Modifikasian
      Surat Utang*
      Debt Securities
                                                          Rp
                                                               21,8     Triliun
                                                                                            Rp
                                                                                                 25,8           Triliun
                                                                                                                                 Unqualified Opinion / Unmodified Opinion
      Outstanding
                                                          USD
                                                                1.3   Billion
                                                                                            USD
                                                                                                  1.5       Billion
                                                                                                                                       Opini Audit Laporan Keuangan 17 tahun berturut-turut
                                                                                                                                          Financial Statement Audit Opinion 17 years in a row
                                                     * Diaudit / Audited




                                                                                                  PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |            9
Page 12
 Tentang PT SMI
 About PT SMI




Langkah Nyata PT SMI dalam Mendukung Proyek Keberlanjutan di Indonesia
PT SMI’s concrete steps in Supporting Sustainability Projects in Indonesia




Pinjaman Tematik dari
Lembaga Pembiayaan Pembangunan                                                      SDG Indonesia One (SIO)
Thematic Facilities from Development Finance                                        SDG Indonesia One (SIO)
Institutions (DFIs)
Memperoleh fasilitas pinjaman hijau dari AFD senilai USD100                         Platform Blended Finance yang dibentuk pada Oktober 2018 untuk
juta dan USD150 juta, masing masing pada tahun 2015 dan 2020.                       mendukung Sustainable Development Goals (SDGs), termasuk
Selain itu, ADB memberikan pinjaman SIO GFF sebesar USD150 juta                     dukungan pada proyek hijau
pada tahun 2022.
Obtained green loan facilities from AFD for USD 100 million and USD                 Blended Finance platform formed in October 2018 to support
150 million in 2015 and 2020, respectively. Additionally, ADB provided              Sustainable Development Goals (SDGs) including support for
a SIO GFF loan of USD 150 million in 2022.                                          green projects.




Menerbitkan Green Bond                                                              Pinjaman & Hibah Panas Bumi
Korporasi pertama di Indonesia                                                      Geothermal Loan & Grants
Issued the first corporate green bond in Indonesia
                                                                                    Terdiri atas 2 jenis program, yaitu: Geothermal Energy Upstream
Menerbitkan Green Bond sebesar Rp500 Miliar, di mana 100% dana                      Development Project (GEUDP) dan Geothermal Resource Risk
yang dihimpun telah dialokasikan ke proyek-proyek yang sesuai                       Mitigation (GREM) yang diperuntukkan untuk kegiatan eksplorasi
dengan kerangka Green Bonds PT SMI.                                                 panas bumi dengan mengimplementasikan skema de-risking.
                                                                                    There are two types of programs: Geothermal Energy Upstream
Issued a Green Bond of IDR 500 billion, with 100% of the proceeds fully             Development Project (GEUDP) dan Geothermal Resource Risk
allocated to projects aligned with PT SMI’s Green Bond Framework.                   Mitigation (GREM) for geothermal explorations which implement
                                                                                    de-risking scheme.




ETM Country Platform Manager                                                        Pinjaman Sindikasi Terkait Keberlanjutan
ETM Country Platform Manager                                                        Sustainability-Linked Syndicated Loan
PT SMI ditunjuk sebagai institusi pelaksana dari Energy Transition                  Memperoleh fasilitas pinjaman sindikasi terkait keberlanjutan
Mechanism Country Platform Manager melalui Keputusan Menteri                        senilai USD700 juta pada tahun 2023 dan USD600 juta pada
Keuangan No.275/KMK.010/2022.                                                       tahun 2025.

PT SMI was appointed as the implementing institution for the Energy                 Received sustainability-linked syndicated loan facilities amounting
Transition Mechanism Country Platform Manager under Minister of                     to USD 700 million in 2023 and USD 600 million in 2025.
Finance Decree No. 275/KMK.010/2022.




‘AA’ MSCI Provisional ESG Rating                                                    Kerangka Pendanaan Berkelanjutan
                                                                                    Sustainable Funding Framework
Memperoleh provisional ESG Ratings pertama pada tahun 2024                          Meluncurkan Sustainable Funding Framework pada tahun
dari MSCI dengan peringkat AA (leader), menjadi salah satu yang                     2025, yang telah memperoleh Second Party Opinion (SPO) dari
terbaik di Industri.                                                                Morningstar Sustainalytics.

Received its first provisional ESG Rating in 2024 from MSCI at                      Launched the Sustainable Funding Framework in 2025, which
AA (Leader), placing the Company among the top performers                           has obtained a Second Party Opinion (SPO) from Morningstar
in the industry.                                                                    Sustainalytics.




              10 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 13
                                                                                                                            Kerangka Pendanaan
                                                                                                                            Berkelanjutan
                                                                                                                            Sustainable Funding
                                                                                                                            Framework




Kerangka Pendanaan Berkelanjutan
Sustainable Funding Framework

                                      Sebagai bagian dari komitmen keberlanjutan, pada tahun 2025
                                      PT SMI mengambil langkah inisiatif untuk turut mendukung mendorong
                                      inisiatif pendanaan berkelanjutan di Indonesia. Dengan mengacu kepada
                                      best practice di dunia, PT SMI mengembangkan Kerangka Pendanaan
                                      Berkelanjutan (“Sustainable Funding Framework”).
                                      As part of our sustainability commitment, in 2025 PT SMI took an initiative
                                      to support the development of the sustainable funding market in Indonesia.
                                      PT SMI has developed a Sustainable Funding Framework to follow world best
                                      practices.



Kerangka Pendanaan Berkelanjutan PT SMI merupakan              PT SMI Sustainable Financing Framework represents
pengembangan dari Kerangka Obligasi Hijau PT SMI,              an expansion of PT SMI’s Green Bond Framework, with
dengan ruang lingkup yang diperluas mencakup                   a broader and more comprehensive scope covering
pembiayaan bertema hijau, sosial, keberlanjutan,               green, social, sustainability, blue, and orange-themed
biru, dan oranye secara lebih komprehensif. Selain itu,        financing. In addition, the framework accommodates
kerangka ini juga mengakomodasi ragam instrumen                a wider range of financing instruments, including
pendanaan yang lebih luas, meliputi penerbitan                 bond issuances, Medium-Term Notes (MTN), bank
obligasi, Medium-Term Notes (MTN), pinjaman bank,              loans, sukuk and other Sharia-compliant financing
sukuk dan fasilitas pembiayaan syariah, serta sumber           facilities, as well as other sustainable funding sources.
pendanaan berkelanjutan lainnya.

Kerangka ini disusun mengacu pada ketentuan                    This framework has been developed in accordance
Peraturan Otoritas Jasa Keuangan (“POJK”) Nomor                with Financial Services Authority Regulation (POJK)
18 Tahun 2023 tentang Obligasi Keberlanjutan                   No. 18 of 2023 on Sustainability Bonds, which updates
(Sustainability Bond), yang merupakan perubahan                POJK No. 60 of 2017 on Green Bonds.
dari POJK Nomor 60 Tahun 2017 tentang Obligasi
Berwawasan Lingkungan (Green Bond).

Kerangka pendanaan ini juga selaras dengan prinsip             The framework is also aligned with key international
dan standar internasional, antara lain:                        principles and standards, including:
• International Capital Markets Association (“ICMA”)           • International Capital Market Association (ICMA):
 
 Sustainability Bond Guidelines 2021 (SBG), Green                 Sustainability Bond Guidelines 2021 (SBG), Green
 Bond Principles 2021 (GBP), Social Bond Principles               Bond Principles 2021 (GBP), and Social Bond
 2023 (SBP),                                                      Principles 2023 (SBP)
• ASEAN Capital Markets Forum (ACMF)                           • ASEAN Capital Markets Forum (ACMF):
 
 Sustainability Bond Standards 2018 (SUS), Green                 Sustainability Bond Standards 2018 (SUS), Green
 Bond Standards 2018 (GBS) and Social Bond                       Bond Standards 2018 (GBS), and Social Bond
 Standards 2018                                                  Standards 2018 (SBS)
• Loan Market Association (LMA), Asia Pacific Loan             • Loan Market Association (LMA), Asia Pacific
 
                                                                 
 Market Association (APLMA), Loan Syndications                   Loan Market Association (APLMA), and Loan
 and Trading Association (LSTA)                                  Syndications and Trading Association (LSTA):
 Green Loan Principles 2023 (GLP) dan Social Loan                Green Loan Principles 2023 (GLP) and Social Loan
 Principles 2023 (SLP).                                          Principles 2023 (SLP).


Keselarasan dengan Standar                                     Keselarasan dengan UN SDGs
Alignment with standards                                       Alignment with UN SDGs




                                           PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |    11
Page 14
      Kerangka Pendanaan
      Berkelanjutan
      Sustainable Funding
      Framework




                                                     Kerangka Pendanaan Berkelanjutan
                                                       Sustainable Funding Framework




       Pengunaan Dana                               Proses Seleksi &                      Manajemen Dana                            Pelaporan
        Use of Proceeds                             Evaluasi Proyek                        Management                               Reporting
                                                   Project Selection &                      of Proceeds
                                                   Evaluation Process
       100% (seratus persen)                  Proyek dievaluasi berdasarkan                 Dana dari pendanaan              Menerbitkan laporan alokasi
    pendanaan setelah dikurangi               kelayakan finansial serta risiko           berkelanjutan yang belum              pendanaan proyek secara
   biaya transaksi dialokasikan ke          lingkungan, sosial dan tata kelola         dialokasikan ke proyek dikelola      tahunan (bilamana diwajibkan
   proyek yang memenuhi standar               sesuai kebijakan perlindungan              mengikuti prosedur internal      oleh standar dan peraturan yang
         dalam framework.                      lingkungan dan sosial PT SMI.                       PT SMI.                    berlaku), guna memberikan
      100% (one hundred percent)               Projects are evaluated based             Unallocated funding proceeds      transparansi dan memungkinkan
    of the funding, after deducting             on financial viability as well        from sustainable funding sources   investor memantau implementasi
     transaction costs, is allocated           as environmental, social and              will be managed by PT SMI in     pendanaan berkelanjutan PT SMI.
    to eligible projects which meet           governance risks according to            accordance with PT SMI internal      Publish an annual Allocation
       the standards set out in the           PT SMI’s Environmental & Social                     procedures.            Report on the use of proceeds to
               framework.                        Safeguards (ESS) policies.                                              projects (if required by applicable
                                                                                                                             standards and regulation),
                                                                                                                           enabling investors to monitor
                                                                                                                           the implementation of PT SMI
                                                                                                                                Sustainable Funding.




                            Proyek Hijau
                                                                                                                                       Proyek Biru / Blue Project
                            Green Project


  Energi terbarukan / Renewable Energy




     Pembangkit Listrik        Pembangkit Listrik     Pembangkit Listrik      Pembangkit Listrik    Energi Terbarukan
       Tenaga Angin              Tenaga Surya         Tenaga Minihidro       Tenaga Panas Bumi          Kelautan
       Onshore Wind             Onshore Solar          Mini Hydropower        Geothermal Energy    Marine Renewables
         Facilities            Photovoltaic (PV)             Plants



  Efisiensi energi / Energy Efficiency




     Efisiensi Energi            Penerangan               Peningkatan          Transportasi Laut     Jaringan Listrik      Pemulihan            Pompa Panas
    dari Infrastruktur           Jalan Pintar         Efisiensi Pendingin        Keberlanjutan            Pintar             Panas               Heat Pump
    Improvement Energy               Smart             Improved Chillers         Sustainable           Smart Grid        Heat Recovery
Efficiency of Infrastructure     Streetlighting                                Marine Transport




  Pencegahan dan Pengendalian Polusi / Pollution Management and Prevention




       Pengolahan                  Drainase            Bahan Bakar dari          Sistem Sanitasi    Pembangkit Listrik     Pelabuhan
      Limbah Padat                Perkotaan               Sampah                      Kota           Tenaga Sampah        Berkelanjutan
       Solid Waste               City Drainage          Refuse Derived            Municipal          Waste to Energy     Sustainable Port
      Management                                             Fuel             Sanitation System




                   12 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 15
                                                                                                                                                                    Kerangka Pendanaan
                                                                                                                                                                    Berkelanjutan
                                                                                                                                                                    Sustainable Funding
                                                                                                                                                                    Framework




Pengelolaan SDA dan Penggunaan Lahan yang Berkelanjutan / Sustainable Natural Resources and Land Use Management




               Irigasi              Bendungan                   Kolam Air                Pengelolaan Tanah
             Irrigation               Dams                     Water Ponds           Solid Management System



Transportasi Ramah Lingkungan / Clean Transportation




           Transportasi        Peningkatan Sistem               Kendaraan               Peningkatan Jaringan
              Massal          Parkir Kendaraan Listrik            Hybrid               Transportasi Tahan Iklim
              Clean              Improvement EV               Hybrid Vehicle      Transportation Network Upgrade
          Transportation          Parking System                                     to Climate Resilient Design




                                     Proyek Sosial
                                                                                                                                                  Proyek Oranye / Orange Project
                                     Sosial Project


  Infrastruktur Dasar yang Terjangkau / Affordable Basic Infrastructure




            Sistem            Sistem Pengolahan                 Sanitasi                 Penyediaan              Telekomunikasi              Transportasi
         Penyediaan Air       Limbah Perkotaan                 Sanitation                Listrik Publik       Telecommunication                 Umum
          Clean Drinking        Sewers System                                         Public Electricity                                Public Transportation
              Water


   Akses Terhadap Layanan Esensial                                                                                                       Perumahan yang Terjangkau
   Access to Essential Services                                                                                                                  Affordable Housing




          Infrastruktur           Infrastruktur                                                                          Hunian               Pinjaman Perumahan untuk MBR
           Pendidikan              Kesehatan                                                                           Terjangkau                     Housing Loans for
       Education Facilities         Hospital                                                                       Affordable Housing             low income communities


   Ketahanan Pangan dan Sistem Pangan Berkelanjutan                                                        Peningkatan dan Pemberdayaan Sosio-Ekonomi
   Food Security and Sustainable Food Systems                                                              Socioeconomic Advancement and Empowerment




     Kegiatan yang Mengurangi Kehilangan            Penyimpanan                              Kegiatan yang          Pembiayaan untuk            Proyek yang               Kegiatan Terkait ESG/
         Pangan dan Sampah Pangan                      Pangan                               Mendukung Akses            Perempuan                Mendukung                SDG untuk Perempuan,
       Reduction of Food Loss and Waste           Food Warehousing                          dan Kesempatan              Financing to         Kesetaraan Gender                 Anak-anak,
                                                                                              yang Setara                  Women                  & Inklusi                 Kelompok Rentan
                                                                                            Provide Equitable                               Gender Equality and   Women, Children and
                                                                                                 Access                                      Inclusion Project  Vulnerables Group Project




         Second Party Opinion (SPO)
         Pada 21 Maret 2025, Morningstar Sustainalytics memberikan opini bahwa Kerangka Pendanaan Berkelanjutan PT SMI bersifat kredibel,
         berdampak, dan selaras dengan Sustainability Bond Guidelines 2021, Green Bond Principles 2021, Social Bond Principles 2023, Green Loan
         Principles 2023, and Social Loan Principles 2023.
         On 21 March 2025, Morningstar Sustainalytics issued opinion that PT SMI’s Sustainable Financing Framework is credible, impactful, and
         aligned with Sustainability Bond Guidelines 2021, Green Bond Principles 2021, Social Bond Principles 2023, Green Loan Principles 2023,
         and Social Loan Principles 2023.

                                                  Kerangka Pendanaan Berkelanjutan dan Laporan Second Party Opinion dari Morningstar Sustainalytics dapat ditemukan di www.ptsmi.co.id
                                                              The Sustainable Funding Framework and Second Party Opinion by Morningstar Sustainalytics can be found on www.ptsmi.co.id




                                                                        PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |              13
Page 16
   Realisasi Pendanaan Berdasarkan Kerangka
   Pendanaan Berkelanjutan PT SMI
   Sustainable Funding Under PT SMI’s
   Sustainable Funding Framework




Realisasi Pendanaan Berdasarkan
Kerangka Pendanaan Berkelanjutan PT SMI
Sustainable Funding Under PT SMI’s Sustainable Funding Framework




                               Sebagai implementasi dari Kerangka                             As an initial implementation of its
                               Pendanaan       Berkelanjutan,   PT    SMI                     Sustainable Funding Framework, PT SMI
                               menerbitkan       Obligasi   Keberlanjutan                     issued Shelf Registration Sustainability
                               Berkelanjutan I Sarana Multi Infrastruktur                     Bond I Sarana Multi Infrastruktur Phase I
                               Tahap I Tahun 2025 senilai Rp600 miliar                        Year 2025 amounting to IDR 600 billion on
                               pada 8 Juli 2025, dengan seluruh dana                          8 July 2025, with all proceeds allocated to
                               dialokasikan untuk pembiayaan proyek                           finance sustainable infrastructure projects.
                               infrastruktur berkelanjutan.

                               Penerbitan         ini         menegaskan                      This     issuance  demonstrates      that
                               bahwa      kerangka       tersebut   telah                     the framework has been effectively
                               diimplementasikan secara nyata melalui                         implemented through funding mobilization,
                               mobilisasi pendanaan, dengan komitmen                          with a commitment to allocate 100%
                               penyaluran 100% dana setelah dikurangi                         of the proceeds, net of transaction
                               biaya    transaksi     untuk    membiayai                      costs, to finance infrastructure projects
                               proyek-proyek infrastruktur berdampak                          with measurable environmental and
                               lingkungan dan sosial terukur.                                 social impacts.

                               Ke depan, PT SMI akan terus memperkuat                         Going forward, PT SMI will continue to
                               pendanaan         berkelanjutan  guna                          strengthen its sustainable financing efforts
                               mendukung pembangunan infrastruktur                            to support the development of sustainable
                               berkelanjutan di Indonesia.                                    infrastructure in Indonesia.



                                          Instrumen Pendanaan                                           Alokasi Pendanaan
                                            Funding Instrument                                          Funding Allocation




                                                         100%                                                    100%




                                                 Obligasi Keberlanjutan                                       Sudah Dialokasi
                                                  Sustainability Bonds                                        Fully Allocated




               14 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 17
                                                                                                                                            Obligasi Keberlanjutan Berkelanjutan I
                                                                                                                                            Sarana Multi Infrastruktur Tahap I Tahun 2025
                                                                                                                                            Shelf Registration Sustainability Bond I
                                                                                                                                            Sarana Multi Infrastruktur Phase I Year 2025




Obligasi Keberlanjutan I Sarana Multi
Infrastruktur Tahap 1 Tahun 2025
Shelf Registration Sustainability Bond I
Sarana Multi Infrastruktur Phase I Year 2025
PT    SMI  menerbitkan     Obligasi Keberlanjutan                                                   PT SMI issued Shelf Registration Sustainability Bond
Berkelanjutan I Sarana Multi Infrastruktur Tahap                                                    I Sarana Multi Infrastruktur Phase I Year 2025 with
I Tahun 2025 dengan nilai emisi sebesar Rp600                                                       issuance amount value of IDR 600 billion, which was
miliar, yang merupakan Obligasi Keberlanjutan                                                       the first Sustainability Bond issued by the company.
atau Sustainability Bond pertama yang diterbitkan                                                   The issuance was part of the IDR12 trillion sustainability
Perseroan. Penerbitan ini merupakan bagian dari                                                     bond issuance program.
Penawaran Umum Berkelanjutan (PUB) Obligasi
Keberlanjutan I sebesar Rp12 triliun.

Seluruh dana yang diperoleh dari penerbitan ini,                                                    All proceeds from this issuance, after deduction of
setelah dikurangi dengan biaya-biaya Emisi, telah                                                   issuance-related costs, have been fully utilized and
dipergunakan untuk pembiayaan ulang (refinancing)                                                   earmarked to refinance several financing portfolio
atas portofolio pembiayaan kami yang termasuk                                                       that qualifies under the green and social category, in
dalam kriteria KUBL (Kegiatan Usaha Berwawasan                                                      accordance with our Sustainable Funding Framework
Lingkungan) dan KUBS (Kegiatan Usaha Berwawasan                                                     and as stipulated under POJK No. 18/2023.
Sosial) sesuai Sustainable Funding Framework,
sebagaimana mengacu kepada POJK No. 18/2023.

Proyek-proyek    tersebut    memberikan      dampak                                                 These projects deliver measurable environmental
lingkungan dan sosial yang terukur, antara lain                                                     and social impacts, including the expansion of green
melalui peningkatan energi hijau, pengurangan emisi,                                                energy, reduction of emissions, improved access to
perluasan akses infrastruktur dasar, serta penguatan                                                basic infrastructure, and the strengthening of social
inklusi dan kesejahteraan sosial, sejalan dengan                                                    inclusion and community well-being, in line with the
prinsip pendanaan berkelanjutan.                                                                    principles of sustainable funding.


     Informasi Obligasi /Bond Information
                                                                                                                Perbankan
                                                                                                                     Bank   8%                        1% Lain-lain
                                                                                                                                                         Others
          Nama Instrumen / Instrument Name
             Obligasi Keberlanjutan Berkelanjutan I
             Sarana Multi Infrastruktur Tahap I Tahun 2025
             Shelf Registration Sustainability Bond I
             Sarana Multi Infrastruktur Phase I Year 2025                                                  19%                                                                   41%
                                                                                                    Dana Pensiun                                                                 Reksa Dana
          Jumlah Penerbitan / Amount Issued                                                         Pension Fund                       Per Desember                              Mutual Fund
                                                                                                                                            2025
            Rp
                  600            Milliar / billion
                                                     (bagian dari PUB sebesar Rp12 triliun)
                                                     (part of an IDR12 trillion issuance program)
                                                                                                                                      As of December
                                                                                                                                            2025

          Tenor / Tenor

            1, 3 dan 5 tahun
                                                                                                           31%
                                                      1, 3 and 5 years



          Tanggal Pencatatan / Listing Date                                                               Asuransi
                                                                                                        Insurance
            8 Juli 2025                8 July 2025


          Tanggal Jatuh Tempo / Maturity Date
            Seri A: 18 Juli 2026 / Series A: 18 July 2026
                                                                                                    Profil Investor / Investor Profile
            Seri B: 8 Juli 2028 / Series B: 8 July 2028
            Seri C: 8 Juli 2030 / Series C: 8 July 2030
                                                                                                    Per 31 Desember 2025, kepemilikan Obligasi
          Kupon / Coupon                                                                            Keberlanjutan Berkelanjutan I Sarana Multi Infrastruktur
            Seri A: 6,20% / Series A: 6.20%                                                         Tahap I Tahun 2025 didominasi investor reksa dana,
            Seri B: 6,55% / Series B: 6.55%                                                         asuransi dan dana pensiun.
            Seri C: 6,65% / Series C: 6.65%

          Peringkat Kredit / Credit Rating
                                                                                                    As of 31 December 2025, the ownership of Shelf
                                                                                                    Registration Sustainability Bond I Sarana Multi
            idAAA (PEFINDO)                                                                         Infrastruktur Phase I Year 2025 was predominantly
          Bursa Pencatatan / Listing Exchange                                                       held by mutual funds, insurance companies, and
            Bursa Efek Indonesia                                                                    pension funds.
            Indonesia Stock Exchange




                                                                                PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |      15
Page 18
    Obligasi Keberlanjutan Berkelanjutan I
    Sarana Multi Infrastruktur Tahap I Tahun 2025
    Shelf Registration Sustainability Bond I
    Sarana Multi Infrastruktur Phase I Year 2025




                       Proses Seleksi & Evaluasi Proyek /Project Selection & Evaluation Process


                                                                            Penyaringan
               14 proyek berwawasan                                        menggunakan
                keberlanjutan dalam                                     Sustainable Funding                     Daftar akhir terdiri dari
               portofolio pembiayaan                                   Framework PT SMI dan                     3 proyek berwawasan
               PT SMI yang memenuhi                                kajian kebijakan Lingkungan                   keberlanjutan yang
               kriteria pada Juni 2025.                                  dan Sosial PT SMI.                       memenuhi syarat.
               14 projects in the green                              Sorting using the PT SMI’s
                                                                                                                A final list comprised of
                 project portfolio and                                  Sustainable Funding
                                                                                                                3 eligible sustainability
                   pipeline of PT SMI                                 Framework and PT SMI’s
                                                                                                                         projects.
                      in June 2025.                                       Environmental &
                                                                           Social policies.




Mengacu kepada ketentuan pada POJK 18,                                               In accordance with the provisions of POJK 18,
Sustainability Bond Guidelines 2021, dan The ASEAN                                   Sustainability Bond Guidelines 2021, and The ASEAN
Sustainability Bond Standards 2018, PT SMI melakukan                                 Sustainability Bond Standards 2018, PT SMI conducted
proses seleksi & evaluasi terhadap portfolio                                         a selection and evaluation process of its financing
pembiayaan berkelanjutan yang memenuhi syarat                                        portfolio to identify eligible sustainable projects under
pada Kerangka Pendanaan Berkelanjutan PT SMI.                                        PT SMI’s Sustainable Funding Framework.

Dari hasil evaluasi tersebut, terdapat 3 proyek                                      Based on this evaluation, three eligible sustainable
berwawasan keberlanjutan yang sesuai dengan                                          projects considered in line with the PT SMI Sustainable
kriteria dalam Kerangka Pendanaan Berkelanjutan                                      Funding Framework, comprising one solar power
PT SMI, terdiri dari 1 proyek Pembangkit Listrik Tenaga                              plant project, one minihydro power plant project, and
Surya (PLTS), 1 proyek Pembangkit Listrik Tenaga                                     one satellite project.
Minihydro (PLTM) dan 1 proyek Satelit.


                        Sektor                                                    Nama Proyek                                 Alokasi Dana
                        Sector                                                    Project Name                               Fund Allocation

                                                        Pembangkit Listrik Tenaga Surya (PLTS) Kota Bukit Indah
                                                                 Bukit Indah City Solar Power Plant
                                                                                                                                    30,1%
               Energi Terbarukan
               Renewable Energy
                                                           Pembangkit Listrik Tenaga Minihydro (PLTM) Rahu-2
                                                                   Mini Hydro Power Plant Rahu-2
                                                                                                                                     19,7%

  Infrastruktur Dasar yang Terjangkau                                    Proyek Satelit Nusantara Lima
      Affordable Basic Infrastructure                                       Nusantara Lima Satellite
                                                                                                                                    50,2%

PT SMI telah mengalokasikan 100% dana hasil                                          PT SMI has allocated 100% of the proceeds from the
penerbitan Obligasi Keberlanjutan tersebut setelah                                   Sustainable Bond issuance, net of issuance costs, to 2
dikurangi biaya-biaya emisi ke 2 (dua) proyek                                        (two) green projects in the renewable energy sector
hijau sektor Energi Terbarukan dan 1 (satu) proyek                                   and 1 (one) social project in the affordable basic
sosial sektor Infrastruktur Dasar yang Terjangkau.                                   infrastructure sector.

Seluruh proyek tersebut merupakan pembiayaan                                         All of these projects represent refinancing of PT SMI’s
kembali (refinancing) atas portofolio pembiayaan                                     existing sustainable financing portfolio.
berkelanjutan yang telah dimiliki PT SMI.

Jenis Pembiayaan / Financing Type                                                    Sebaran Sektor / Sector Distribution



                                                                                     Infrastruktur
                                                                                     Dasar yang                               Energi
Pembiayaan Kembali                        100%                                       Terjangkau       50,2%   49,8%      Terbarukan
Refinancing                                                                          Affordable                           Renewable
                                                                                     Basic                                   Energy
                                                                                     Infrastructure




                  16 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 19
                                                            Obligasi Keberlanjutan Berkelanjutan I
                                                            Sarana Multi Infrastruktur Tahap I Tahun 2025
                                                            Shelf Registration Sustainability Bond I
                                                            Sarana Multi Infrastruktur Phase I Year 2025




PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |      17
Page 20
   Estimasi Dampak Lingkungan dan sosial
   Estimated Environmental and Social Impact




Estimasi Dampak Lingkungan dan Sosial
Estimated Environmental and Social Impact




Kerangka Kerja Pendanaan Berkelanjutan PT SMI                                      PT SMI’s Sustainable Funding Framework has aligned
telah menyelaraskan beberapa standar nasional                                      with several applicable national standards including
yang berlaku termasuk Standar Perlindungan                                         PT SMI Environmental and Social Safeguards
Lingkungan dan Sosial PT SMI (Standar ESS) dan                                     Standards (ESS Standards) and has also considered
juga telah mempertimbangkan beberapa pedoman                                       various international guidelines related to Blue
internasional yang berkaitan dengan Obligasi/                                      Bonds/Loans and Orange Bonds/Loans, such as the
Pinjaman Biru dan Obligasi/Pinjaman Oranye seperti                                 Blue Finance Guidelines (IFC) and the Orange Bond
Pedoman Keuangan Biru (IFC), dan Prinsip Obligasi                                  Principles (Orange Movement).
Oranye (Orange Movement).

Dari informasi yang telah dihimpun, PT SMI telah                                   From the information collected, PT SMI has determined
menentukan beberapa indikator dan metode                                           several indicators and calculation methods that will
perhitungan yang akan digunakan dalam pelaporan                                    be used in Sustainable Funding Report. The indicators
Pendanaan Berkelanjutan setiap tahunnya. Indikator                                 and methods selected are in accordance with
dan metode yang terpilih sudah sesuai dengan                                       international standards. Besides the environmental
standar internasional. Selain dampak lingkungan                                    and social impacts, PT SMI is also reporting other
dan dampak sosial, PT SMI juga berupaya untuk                                      positive impact.
melaporkan dampak positif lainnya.

Proses perhitungan dimulai dengan penghimpunan                                     The calculation process begins with collecting data
data dari para debitur yang merupakan pemilik                                      from debtors who are project owners that received
proyek penerima dana hasil penerbitan Pendanaan                                    the issuance of Sustainable Funding. The information
Berkelanjutan. Informasi yang digunakan merupakan                                  used is primary data related to the projects, therefore
data primer terkait proyek, oleh karenanya pemilihan                               the selection of indicators and methods has also
indikator dan metode juga mempertimbangkan                                         considered primary data availability.
ketersediaan data primer.

Informasi   lebih lanjut    mengenai   metode                                      Further information regarding the calculation method
perhitungan dapat dilihat di bagian Pendekatan                                     can be found in the Impact Reporting Approach
Pelaporan Dampak.                                                                  section.




                18 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 21
                                                                                                          Estimasi Dampak Lingkungan dan sosial
                                                                                                          Estimated Environmental and Social Impact




           Estimasi Dampak Lingkungan dan Sosial periode Januari – Desember 2025
      Estimated Environmental and Social Impact for the Period of January – December 2025


                                                                                                Infrastruktur Dasar
                                                    Energi Terbarukan                            yang Terjangkau
                                                    Renewable Energy                              Affordable Basic
                                                                                                    Infrastructure
         Nama Proyek                                                                                                                    Total
         Project Name              Pembangkit Listrik          Pembangkit Listrik                                                       Total
                                                                                                 Satelit Nusantara
                                  Tenaga Surya (PLTS)           Tenaga Minihidro
                                                                                                        Lima
                                    Kota Bukit Indah              (PLTM) Rahu-2
                                                                                                  Nusantara Lima
                                  Bukit Indah City Solar      Mini Hydro Power Plant
                                                                                                      Satellite
                                       Power Plant                   Rahu-2w

Alokasi Dana Hasil Penerbitan            30,1%                           19,7%                          50,2%                         100,0%
Allocation of Proceeds                    30.1%                           19.7%                          50.2%                         100.0%

Emisi GRK yang Terhindarkan          108.694,978                    34.145,779                              -                    142.840,757
GHG Emission Avoided (ton CO2e)        108,694.978                     34,145.779                           -                       142,840.757

Energi yang Dihasilkan                   131.116                       36.442                               -                         167.558
Energy Produced (MWh)                     131,116                        36,442                             -                          167,558

Kapasitas Energi Terbarukan
yang Bertambah                            100                             6,4                               -                          106,4
Renewable Energy Capacity                  100                             6.4                              -                           106.4
Added (MW)

Cakupan Layanan (Desa 3T)
Service Coverage (Frontier,                                                                         3.920 Desa                         3.920
Outermost and Underdeveloped                                                                        3,920 Villages                      3,920
Villages)




Untuk sektor Energi Terbarukan, indikator utama yang               For the Renewable Energy sector, the core indicators
digunakan meliputi jumlah energi yang dihasilkan per               used include annual energy produced (in MWh),
tahun (dalam MWh), emisi Gas Rumah Kaca (“GRK”)                    annual Greenhouse Gases (GHGs) emissions avoided
yang terhindarkan per tahun (dalam ton CO2e),                      (in ton CO2e) and renewable energy capacity installed
dan kapasitas energi terbarukan yang terpasang                     (in MW). Meanwhile for the Telecommunication sector,
(dalam MW). Sementara untuk sektor Telekomunikasi,                 the core indicators used include equitable access
indikator utama yang digunakan meliputi akses dan                  to and control over assets, services, resources,
kendali yang setara terhadap aset, layanan, sumber                 and opportunities.
daya, serta peluang.

Beberapa indikator dampak lainnya yang dapat kami                  Some of the other impact indicators gathered
kumpulkan meliputi pengurangan impor BBM (dalam                    include decrease of oil imports (in USD), employment
USD), penciptaan lapangan pekerjaan (dalam jumlah                  generation (in number of workers hired during
tenaga kerja yang dipekerjakan pada tahap konstruksi               construction and operation stages), knowledge
dan operasi), transfer pengetahuan (dalam jumlah                   transfer (in numbers of employees trained),
pekerja yang menerima pelatihan), dan bantuan                      and assistance to locals in kind (in equivalent
kepada masyarakat setempat (dalam Rupiah).                         Rupiah amount).

Pada laporan tahun ini, PT SMI telah mengkalkulasi                 In this year’s report, PT SMI has calculated and
dan memberikan estimasi dampak lingkungan dan                      estimated the environmental and social impacts of
sosial dari ketiga proyek yang telah dibiayai oleh                 the three projects that have been financed by the
sumber pendanaan berkelanjutan untuk periode                       sustainable funding sources for the data period of
data 1 Januari 2025 sampai 31 Desember 2025                        1 January 2025 to December 31, 2025 (1 year data).
(satu tahun).




                                               PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |    19
Page 22
   Estimasi Dampak Lingkungan dan sosial
   Estimated Environmental and Social Impact




Keterkaitan dengan Tujuan Pembangunan Berkelanjutan (TPB)
Relation with the Sustainable Development Goals (SDGs)


PT SMI berperan aktif dalam mendukung pencapaian                                   PT SMI plays an active role in supporting the
SDGs dengan menyediakan berbagai bentuk                                            achievement of the SDGs by providing various forms
dukungan yang mempertimbangkan keseimbangan                                        of support that balance social and economic benefits
antara manfaat sosial, ekonomi, serta risiko lingkungan                            with environmental and social risks, particularly in
dan sosial, khususnya dalam menghadapi tantangan                                   addressing climate change challenges.
perubahan iklim.

Sejalan dengan peran tersebut, PT SMI juga                                         In line with this role, PT SMI has also been mandated by
menerima mandat dari Kementerian Keuangan                                          the Ministry of Finance as the implementing agency
sebagai implementing agency platform Sustainable                                   for the Sustainable Development Goals Indonesia
Development Goals Indonesia One (SDG Indonesia                                     One (SDG Indonesia One) platform, an integrated
One), sebuah platform kolaborasi terintegrasi untuk                                collaboration platform for financing SDG-oriented
pembiayaan pembangunan infrastruktur berbasis                                      infrastructure development in Indonesia. Through
SDGs di Indonesia. Melalui platform ini, PT SMI mampu                              this platform, PT SMI has successfully mobilized
menggalang pendanaan dari berbagai sumber,                                         funding from various sources, including philanthropic
termasuk filantropi, lembaga donor, lembaga                                        organizations, donor agencies, multilateral and
keuangan multilateral dan bilateral, sektor perbankan,                             bilateral financial institutions, the banking sector,
asuransi, serta investor.                                                          insurance companies, and investors.




                      Kontribusi                                                                           Kontribusi
                       Langsung                                                                            Tidak Langsung
                           Direct                                                                          Indirect
                     Contribution                                                                          Contribution




PT SMI telah mengidentifikasi keterkaitan dampak                                   PT SMI has identified the relation of the impact of
dari proyek-proyek yang telah dibiayai oleh dana                                   projects financed by Sustainability Bond proceeds
hasil penerbitan Sustainability Bond dengan SDGs.                                  with the SDGs. The three projects contributed directly
Ketiga proyek memberikan kontribusi secara                                         to the achievement of SDG targets 4, 7, 12 and 13 and
langsung untuk pencapaian target SDG 4, 7, 12, dan                                 contributed indirectly to SDG targets 1, 3, 5, 8, 9, and 10.
13 serta kontribusi secara tidak langsung untuk SDG
target 1, 3, 5, 8, 9, dan 10.

Sektor     Energi    Terbarukan     berpotensi   untuk                             The Renewable Energy sector has the potential to
memberikan kontribusi langsung pada tujuan 7 , 12,                                 make a direct contribution to goals 7, 12, and 13, as
dan 13, serta kontribusi tidak langsung pada tujuan 1, 8,                          well as an indirect contribution to goals 1, 8, 9 and 10.
9, dan 10. Sementara sektor telekomunikasi berpotensi                              While the telecommunication sector has the potential
untuk memberikan kontribusi langsung pada tujuan                                   to make a direct contribution to goal SDG target 4 , as
target SDG 4, serta kontribusi tidak langsung pada                                 well as an indirect contribution to goals SDG target 5,
tujuan 5, 8, 9, 10. Pembahasan lebih lanjut dapat                                  8, 9, 10. Further discussion can be seen in the Project
dilihat di bagian Profil Proyek.                                                   Profile section.




                20 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 23
                                                                                                                           Profil Proyek
                                                                                                                           Project Profile




Profil Proyek
Projects Profile




                   PT SMI secara aktif berpartisipasi dan mempromosikan pembangunan
                   berkelanjutan. Dengan dukungan dan komitmen para debitur yang merupakan
                   pemilik proyek, PT SMI dapat menyusun Laporan Pendanaan Berkelanjutan dan
                   memberikan estimasi dampak lingkungan dan sosial dari proyek-proyek yang
                   dibiayai dari sumber pendanaan berkelanjutan. Berikut adalah profil ketiga
                   proyek yang telah dibiayai.

                   PT SMI is actively participating in and promoting sustainable development. With
                   the support and commitment of the debtors which are the project owners, PT
                   SMI can produce this Sustainable Funding Report and provide estimates of the
                   environmental and social impact of projects financed from the proceeds of
                   sustainable funding. Here are the profiles of the 3 (three) projects financed.




                                     PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 |   21
Page 24
    Profil Proyek
    Project Profile




  Energi Terbarukan
  Renewable Energy




   Pembangkit Listrik Tenaga Surya (PLTS) Kota Bukit Indah
   Bukit Indah City Solar Power Plant
   Alokasi Hasil Penerbitan: 30,1%             Status Proyek: Beroperasi
   Proceeds Allocation: 30.1%                  Project Status: Operating




Proyek Secara Umum                                                                       General Overview
Proyek PLTS Kota Bukit Indah milik PT Aruna Hijau                                        Kota Bukit Indah Solar Power Plant project, owned by PT
Power (AHP) memiliki kapasitas sebesar 100 MWp                                           Aruna Hijau Power (AHP), has a total installed capacity
dan dibangun di lahan seluas 85 Ha yang terdiri dari                                     of 100 MWp and is constructed on approximately
+/- 170.000 panel surya. Proyek PLTS ground mounted                                      85 hectares of land, consisting of around 170,000
tersebut merupakan bentuk dari kerja sama dengan                                         solar panels. This ground-mounted solar PV project
PT PLN (Persero) melalui anak usahanya, PT PLN Batam                                     is implemented through a partnership with PT PLN
yang memiliki 20% saham AHP. Proyek ini juga berjalan                                    (Persero) via its subsidiary PT PLN Batam, which
dengan dukungan PT Besland Pertiwi sebagai pemilik                                       holds a 20% equity stake in AHP. The project is also
lahan proyek, serta PT Tatajabar Sejahtera sebagai                                       supported by PT Besland Pertiwi as the landowner,
mitra pembeli listrik yang akan disalurkan ke berbagai                                   and PT Tatajabar Sejahtera as the electricity off-
pelanggan di Kawasan industri.                                                           taker partner, responsible for distributing electricity to
                                                                                         various customers within the industrial estate.

Progres Proyek                                                                           Project Progress
Proyek pembangungan PLTS Kota Bukit Indah mulai                                          Construction of the Kota Bukit Indah Solar Power Plant
dilaksanakan sejak Februari 2024 dan telah selesai                                       commenced in February 2024 and was completed in
pada bulan Agustus 2024.                                                                 August 2024.




                      22 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 25
                                                                                                                                                    Profil Proyek
                                                                                                                                                    Project Profile




Dampak Lingkungan
Environmental Impact

                          Kontribusi langsung                                Kontribusi langsung                                    Kontribusi langsung
                          Direct contribution                                Direct contribution                                    Direct contribution




   131.116MWh
   Energi yang dihasilkan per tahun
                                                       108.694ton CO e
                                                       Emisi GRK yang terhindarkan per tahun
                                                                                                   2
                                                                                                               100 MWp
                                                                                                               Kapasitas energi terbarukan yang bertambah
   131,116 MWh                                         108,694 ton CO2e                                        100 MWp
   Annual Energy Produced                              Actual Annual GHG Emission Avoided                      Renewable Energy Capacity Added




Proyek telah beroperasi sehingga data energi yang                                  The project has been operating so the energy data
dihasilkan merupakan data aktual operasional proyek                                generated is the actual data during the period
selama periode Januari-Desember 2025. Energi yang                                  January-December 2025. The energy generated in
dihasilkan pada tahun 2025 sebesar 131.116 MWh                                     2025 is 131,116 MWh, with actual avoided GHG emissions
dengan emisi GRK yang terhindarkan sebesar 108.694                                 amounting to 108,694 tonnes of CO2e.
ton CO2e.

Proyek ini memberikan kontribusi langsung pada                                     This project contributes directly to the achievement
pencapaian sasaran nasional dalam tujuan SDG 7, 12,                                of national targets on SDG 7, 12, and 13 in the form
dan 13 berupa penyediaan akses energi bersih dan                                   of providing access to clean and affordable energy
terjangkau dan peningkatan bauran proporsi energi                                  and increasing the proportion of national renewable
terbarukan nasional (SDG7), penggunaan sumber                                      energy (SDG7), efficient and environmentally friendly
daya terbarukan yang efisien dan ramah lingkungan                                  use of renewable resources (SDG 12) and reducing
(SDG12), dan penurunan emisi GRK nasional (SDG13).                                 national GHG emissions (SDG13).



Dampak Lainnya
Other Impact




                            USD5.882.990                           18 pekerja/workers                       165 tenant/tenants
                            Pengurangan impor BBM                  Selama tahap operasi                Akses energi bersih dan terjangkau
                             Decrease of oil imports               During Operation Stage               Access to clean and safe energy




      Kontribusi tidak langsung
        Indirect contribution




Proyek ini memberikan dampak positif terhadap                                      This project has a positive impact on reducing
pengurangan impor BBM sebesar USD 5.882.990                                        fuel imports by USD 5,882,990 in 2025. During the
pada tahun 2025. Selama tahap operasional, proyek                                  operational stage, the project involved 18 workers,
ini melibatkan 18 pekerja yang semuanya laki-laki.                                 all of whom are male. Additionally, the electricity
Selain itu, listrik yang dihasilkan dari proyek ini                                generated by this project is allocated to meet the
diperuntukkan untuk memenuhi kebutuhan energi di                                   energy needs of industrial areas. The operation of this
area industri. Operasional proyek energi terbarukan                                renewable energy project has a potential to make an
ini berpotensi untuk memberikan kontribusi tidak                                   indirect contribution to SDG goals 1, 8, 9 dan 10.
langsung pada tujuan SDG 1, 8, 9 dan 10.




                                                           PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 | 23
Page 26
    Profil Proyek
    Project Profile




 Energi Terbarukan
 Renewable Energy




   Pembangkit Listrik Tenaga Minihidro (PLTM) Rahu-2
   Mini Hydro Power Plant Rahu-2
   Alokasi Hasil Penerbitan: 19,7%         Status Proyek: Konstruksi
   Proceeds Allocation: 19,7%              Project Status: Under Construction




Proyek Secara Umum                                                                   General Overview
PT Asri Power Prima (APP) merupakan SPV yang                                         PT Asri Power Prima (APP) is an SPV (Special
bergerak di bidang pembangkitan tenaga listrik,                                      Purpose Vehicle) operating in the power generation
dimana kepemilikan sahamnya dimiliki oleh                                            sector, with share ownership held by PT Adidaya
PT Adidaya Mandiri Sejahtera (Paramount Grup)                                        Mandiri Sejahtera (Paramount Group) at 49% and
sebesar 49% dan PT Asripower sebesar 51%.                                            PT Asripower at 51%. In 2011, PT APP signed a Power
Pada 2011, PT APP telah menandatangani kontrak                                       Purchase Agreement (PPA) with PT PLN North Sumatra
Perjanjian Pembelian Tenaga Listrik dengan PT PLN                                    region to develop the Rahu-2 Mini-hydro Power Plant
wilayah Sumatera Utara untuk mengembangkan PLTM                                      (PLTM) with a capacity of 2 x 3.2 MW. The PPA is valid
Rahu-2 kapasitas 2 x 3,2 MW. Kontrak Power Purchase                                  for an operational period of 20 years starting from the
Agreement (PPA) berlaku untuk masa operasi selama                                    COD (Commercial Operation Date).
20 tahun terhitung sejak tanggal operasi.

Progres Proyek                                                                       Project Progress
Proyek   pembangungan      PLTM    Rahu-2    mulai                                   The Mini Hydro Power Plant Rahu-2 construction
dilaksanakan sejak 2023 dan ditargetkan akan mulai                                   project commenced in 2023 and is targeted to begin
beroperasi pada bulan September 2026.                                                operations in September 2026.




                  24 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 27
                                                                                                                                                           Profil Proyek
                                                                                                                                                           Project Profile




Dampak Lingkungan
Environmental Impact

                           Kontribusi langsung                                  Kontribusi langsung                                        Kontribusi langsung
                           Direct contribution                                  Direct contribution                                        Direct contribution




    36.442MWh
    Estimasi energi yang dihasilkan per tahun
                                                          34.145ton CO e                           2
                                                          Estimasi emisi GRK yang terhindarkan per tahun
                                                                                                                     6,4 MW
                                                                                                                     Estimasi kapasitas energi terbarukan yang bertambah
    36,442 MWh                                            34,145 ton CO2e                                            6.4 MW
    Estimated Annual Energy Produced                      Estimated Annual GHG Emission Avoided                      Estimated Renewable Energy Capacity Added




Status proyek masih dalam tahap konstruksi, sehingga                                  The project is still in the construction stage, so the
estimasi dampak lingkungan masih berupa sasaran                                       estimated environmental impact remains as targets
selama periode Januari-Desember 2025. Energi yang                                     for the period January-December 2025. The energy
dihasilkan pada tahun 2025 diestimasikan sebesar                                      generated in 2025 is estimated to be 36,442 MWh,
36.442 MWh dengan estimasi emisi Gas Rumah Kaca                                       with an estimated avoided GHG emission of 34,145.779
(“GRK”) yang terhindarkan sebesar 34.145,779 ton                                      tonnes of CO2e.
CO2e.

Proyek ini memberikan kontribusi langsung pada                                        This project contributes directly to the achievement
pencapaian sasaran nasional dalam tujuan SDG 7, 12,                                   of national targets on SDG 7 and 13 in the form of
dan 13 berupa penyediaan akses energi bersih dan                                      providing access to clean and affordable energy
terjangkau dan peningkatan bauran proporsi energi                                     and increasing the proportion of national renewable
terbarukan nasional (SDG7), penggunaan sumber                                         energy (SDG7), efficient and environmentally friendly
daya terbarukan yang efisien dan ramah lingkungan                                     use of renewable resources (SDG 12) and reducing
(SDG12), dan penurunan emisi GRK nasional (SDG13).                                    national GHG emissions (SDG13).


Dampak Lainnya
Other Impact




   USD1.635.085                                  1 pekerja/workers                       155 pekerja/workers         7.000 kepala keluarga/households
   Pengurangan impor BBM                         Menerima pelatihan                      Selama tahap konstruksi           Akses energi bersih dan terjangkau
    Decrease of oil imports                           Trained                            During construction stage          Access to clean and safe energy




       Kontribusi tidak langsung
         Indirect contribution




Proyek ini memberikan dampak positif terhadap                                         This project has a positive impact on reducing
pengurangan impor BBM sebesar USD 1.635.085                                           fuel imports by USD 1,635,085 in 2025. During the
pada tahun 2025. Selama tahap konstruksi, proyek                                      construction stage, the project involves 155 workers,
ini melibatkan 155 pekerja yang tediri dari 150 pekerja                               consisting of 150 male workers and 5 female workers.
laki-laki, dan 5 pekerja perempuan. Selain itu, listrik                               Additionally, the electricity generated is estimated to
yang dihasilkan diestimasi memenuhi 7.000 kepala                                      supply clean and safe energy to 7,000 households.
keluarga dalam mengakses energi bersih dan                                            This renewable energy project has a potential
terjangkau. Proyek energi terbarukan ini berpotensi                                   to make an indirect contribution to SDG goals 1, 8, 9
untuk memberikan kontribusi tidak langsung pada                                       and 10.
tujuan SDG 1, 8, 9 dan 10.


                                                              PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 | 25
Page 28
    Profil Proyek
    Project Profile




  Proyek Sosial
  Social Project




   Proyek Satelit Nusantara Lima
   Nusantara Lima Satellite Project
   Alokasi Hasil Penerbitan: 50,2%       Status Proyek: Konstruksi          Target Operasional: April 2026
   Proceeds Allocation: 50,2%            Project Status: In Construction    Operational Target: April 2026




Proyek Secara Umum                                                                   General Overview
Satelit Nusantara Lima (N5), milik PT Satelit Nusantara                              Satelit Nusantara Lima (N5), owned by PT Satelit
Lima (anak usaha PT Pasifik Satelit Nusantara),                                      Nusantara Lima (a subsidiary of PT Pasifik Satelit
memiliki kapasitas hingga 160 Gbps (140 Gbps                                         Nusantara), has a capacity of up to 160 Gbps (140
domestik, 20 Gbps internasional). Dibangun dengan                                    Gbps domestic, 20 Gbps international). Built on the
platform Boeing 702MP dan teknologi Very High                                        Boeing 702MP platform with VHTS technology and a
Throughput Satellite (VHTS) dengan masa operasi                                      design life of over 15 years, it is supported by seven
lebih dari 15 tahun, serta didukung tujuh stasiun                                    ground stations across Indonesia. N5 is expected
bumi di Indonesia. N5 diharapkan memperluas akses                                    to expand access to digital services—education,
layanan digital—pendidikan, kesehatan, UMKM, dan                                     healthcare, MSMEs, and connectivity in remote areas.
konektivitas di daerah terpencil.

Progres Proyek                                                                       Project Progress
Satelit Nusantara Lima (N5) diluncurkan pada                                         Nusantara Lima (N5) satellite was launched on
11 September 2025 dari Cape Canaveral, Florida                                       11 September 2025 from Cape Canaveral, Florida,
menggunakan roket Falcon 9 milik SpaceX. Pada                                        using SpaceX’s Falcon 9 rocket, and reached its
29 Januari 2026, satelit telah mencapai orbit                                        geostationary orbit at 113°E above Kalimantan on 29
geostasioner 113° BT di atas Kalimantan untuk                                        January 2026 to strengthen connectivity in eastern
memperkuat konektivitas kawasan timur. Satelit                                       regions; it is targeted to be ready for service (RFS) by
ini ditargetkan mulai beroperasi (RFS) pada akhir                                    end-April 2026, subject to Operational Feasibility Test
April 2026 setelah memperoleh uji laik operasi dari                                  approval from the Ministry of Communication and
Kementerian Komunikasi dan Digital (Kominfo).                                        Digital Affairs (Kominfo).




                  26 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 29
                                                                                                                                                                    Profil Proyek
                                                                                                                                                                    Project Profile




Dampak Sosial
Social Impact


  Mendorong Pemerataan Akses Digital di Indonesia
  melalui Konektivitas Satelit
  Advancing Equitable Digital Access Across
  Indonesia Through Satellite Connectivity                                                                                                  3920
                                                 Satelit
                                                                             Nusantara 5
                                                                                                                                            Desa/Village
                                                                                                                                            Desa 3T yang tercakup
                                                                                                                                            3920 Frontier, Outermost,
                                                                                                                                            and Underdeveloped
                                                                                                                                            Villages Covered*


                                                                                                                                            514
                                                                                                                                            Kota/Kabupaten
                                                                                                                                            514 Cities/Districts




     Wilayah Cakupan /Coverage Area         Wilayah 3T / 3T Region          Area yang tidak tercakup / Non-coverage Area




Proyek Satelit Nusantara Lima yang diluncurkan pada                                        The Nusantara Lima Satellite, launched in September
September 2025 berperan penting dalam mendukung                                            2025, plays an important role in supporting equitable
pemerataan akses pendidikan di Indonesia, khususnya                                        access to education across Indonesia, particularly in
di wilayah 3T seperti Papua dan Maluku. Dengan                                             3T regions such as Papua and Maluku. With a capacity
kapasitas hingga 160 Gbps dan teknologi Very High                                          of up to 160 Gbps and Very High Throughput Satellite
Throughput Satellite (VHTS), satelit ini menyediakan                                       (VHTS) technology, the satellite provides high-speed
konektivitas internet berkecepatan tinggi yang                                             internet connectivity that enables distance learning,
memungkinkan pelaksanaan pembelajaran jarak                                                expands access to digital educational resources,
jauh, memperluas akses terhadap sumber belajar                                             and strengthens internet infrastructure for schools in
digital, serta memperkuat infrastruktur internet bagi                                      remote areas.
sekolah di daerah terpencil.

Dampak Lainnya
Other Impact

Satelit Nusantara Lima dengan teknologi (VHTS),                                            Nusantara Lima Satellite, utilizing (VHTS) technology,
membagi area cakupan menjadi beberapa spot                                                 divides its coverage area into multiple spot beams,
beam, dengan penggunaan frekuensi yang lebih                                               with more efficient frequency usage (frequency
efisien (frequency re-use), menjadikan total kapasitas                                     re-use), resulting in a total bandwidth capacity
bandwidth lebih dari 160 Gbps dengan 7 Ground                                              exceeding 160 Gbps with 7 ground stations spread in
Station tersebar di Indonesia.                                                             Indonesia.

 Aceh                                     Tarakan




  Bengkulu       Cikarang   Banjarmasin
                                                                                             Rp144,6                            5                       7                    39
                               Gresik                                                         juta/million            pekerja/workers          pekerja/workers pekerja/workers
                                              Kupang
                                                                                            Bantuan bagi             Menerima pelatihan         Selama tahap       Selama tahap
                                                                                        masyarakat setempat               Trained                  konstruksi         operasi*
                                                                                        Assistance to locals in                               During construction During operation
                                                                                                 kind                                                Stage             stage*

Kegiatan Tanggung Jawab Lingkungan dan Sosial
dilakukan pada lokasi      di Stasiun Bumi Satelit
Nusantara Lima Aceh, Banjarmasin, Bengkulu,
Cikarang, Gresik, Kupang, dan Tarakan.
The CSR activities were carried out at the Nusantara
                                                                                                                           Kontribusi tidak langsung
Lima Satellite ground stations in Aceh, Banjarmasin,                                                                         Indirect contribution
Bengkulu, Cikarang, Gresik, Kupang, and Tarakan




                                                                     PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 | 27
Page 30
  Pendekatan Pelaporan Dampak
  Impact Reporting Approach




Pendekatan Pelaporan Dampak
Impact Reporting Approach




                                Laporan ini menggunakan indikator dengan merujuk usulan indikator sesuai
                                dalam Kerangka Pendanaan Berkelanjutan PT SMI.

                                Beberapa data indikator diperoleh langsung dari pemilik proyek dan tidak
                                memerlukan perhitungan lebih lanjut. Sementara beberapa indikator lainnya
                                memerlukan perhitungan lebih lanjut dengan menggunakan data mentah dari
                                pemilik proyek.

                                Proyek dapat memberikan beberapa manfaat lainnya diluar indikator yang
                                dilaporkan. Di sisi lain terdapat beberapa proyek dimana indikator yang diajukan
                                tidak dapat diaplikasikan atau data tidak tersedia.

                                This report uses indicators referring to the proposed indicators as outlined in the
                                PT SMI Sustainable Funding Framework.

                                Some indicators data were provided directly by project owners and do not require
                                further calculation while other indicators would require further calculation using
                                raw data provided by project owners.

                                Projects may display benefits across a much wider range of indicators than
                                captured in the impact assessment. On the other hand, there may be some
                                projects for which the proposed indicators are either not applicable, or the data
                                is not available.




              28 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 31
                                                                                                                 Pendekatan Pelaporan Dampak
                                                                                                                 Impact Reporting Approach




Beberapa asumsi dan pendekatan yang digunakan                  The following key assumptions and approach were
dalam penyusunan laporan ini :                                 used in preparing this report:

•U
  ntuk    proyek yang telah memasuki tahap                    • F or projects that have entered the operational
 operasional, data indikator yang disajikan adalah               stage, the indicator data presented are actual data
 data riil yang telah terjadi/tercapai (untuk indikator          that have been realized/achieved (for indicators
 yang memerlukan perhitungan seperti jumlah emisi                requiring calculation, such as the amount of avoided
 yang terhindarkan, data yang disajikan adalah nilai             emissions, the data presented reflect actual values
 aktual dengan menggunakan pendekatan data                       using a physical approach), obtained through
 fisik/physical approach) yang diperoleh melalui                 calculations based on raw actual data from project
 perhitungan dengan menggunakan data riil mentah                 owners and nationally/internationally recognized
 dari pemilik proyek dan faktor konversi yang diakui             conversion factors.
 secara nasional/internasional);

•U
  ntuk   proyek yang belum memasuki tahap                     • F or projects that have not yet entered the
 operasional, data indikator yang disajikan adalah               operational stage, the indicator data presented
 data target yang diharapkan terjadi/tercapai.                   represent target values expected to be achieved. For
 Untuk indikator yang memerlukan perhitungan                     indicators requiring calculation, such as the amount
 seperti jumlah emisi yang terhindarkan, data yang               of avoided emissions, the values presented are
 disajikan adalah nilai target estimasi yang diperoleh           estimated targets derived from calculations based
 melalui perhitungan dengan menggunakan data riil                on raw data provided by project owners and using
 mentah dari pemilik proyek dan faktor konversi yang             nationally or internationally recognized conversion
 diakui secara nasional atau internasional;                      factors.

•D
  ata indikator yang disajikan menggambarkan nilai            • T he indicator data presented illustrates the value
 untuk keseluruhan proyek tanpa memperhitungkan                  for the entire project without taking into account
 besaran porsi pembiayaan yang berasal dari                      the size of the financing portion that comes from PT
 sumber pendanaan berkelanjutan PT SMI.                          SMI’s Sustainable Funding proceeds

•A
  sumsi yang digunakan mungkin dapat berubah                  • T he assumptions used may be subject to change,
 sehingga data indikator yang dihasilkan dapat                   so are the indicators produced. Minor changes in
 berubah. Perubahan minor dalam implementasi                     project implementation could result in different
 proyek dapat menyebabkan pencapaian dampak                      impact achievement between the actual ones and
 aktual berbeda dengan target dampak; dan                        the targeted impact.

•S
  eluruh data indikator yang disajikan berasal dari           •A
                                                                 ll indicator data are from the period of 1 January to
 data tanggal 1 Januari sampai 31 Desember 2025.                 31 December 2025.

Semua data indikator telah diverifikasi dan divalidasi         All indicators data are verified and validated
oleh Auditor Internal PT SMI serta direviu oleh Ahli           by PT SMI’s Internal Auditor and also reviewed by
Lingkungan tersertifikasi (SDGs Hub Universitas                a Certified Environmental Expert (SDGs Hub Universitas
Indonesia).                                                    Indonesia).




                                           PT Sarana Multi Infrastruktur (Persero) Laporan Pendanaan Keberlanjutan 2025 | 29
Page 32
Disclaimer
Laporan Pendanaan Berkelanjutan ini disusun oleh                              This Sustainable Funding Report is developed by PT
PT SMI dengan menggunakan data yang disediakan                                SMI utilizing data that are provided by project owners.
oleh pemilik proyek. Asumsi digunakan bahwa                                   PT SMI is in the position that the data provided by
data yang disediakan oleh pemilik proyek sudah                                project owners are accurate and thus could reflect,
akurat sehingga dapat menggambarkan manfaat                                   as accurate as possible, the environmental and social
lingkungan dan sosial dari proyek.                                            benefits of the projects.



PT Sarana Multi Infrastruktur (Persero)
Sahid Sudirman Center, 47th – 48th Floor                                                  @ptsmi
Jl. Jenderal Sudirman No. 86
Jakarta 10220, Indonesia
                                                                                          @ptsmi
Tel: (62-21) 8082 5288 (hunting)
Fax: (62-21) 8082 5258
                                                                                          PT Sarana Multi Infrastruktur (Persero)
www.ptsmi.co.id
corsec@ptsmi.co.id                                                                        PT Sarana Multi Infrastruktur (Persero)
ir@ptsmi.co.id




           30 | PT Sarana Multi Infrastruktur (Persero) Sustainable Funding Report 2025
Page 33
                   EKSTERNAL REVIU LAPORAN PENDANAAN BERKELANJUTAN
                   PT SARANA MULTI INFRASTRUKTUR (PERSERO) TAHUN 2025
                EXTERNAL REVIEW OF PT SARANA MULTI INFRASTRUKTUR (PERSERO)
                             SUSTAINABLE FUNDING REPORT 2025

SDGs Hub Universitas Indonesia, selaku Eksternal      SDGs Hub Universitas Indonesia, as the External
Reviu yang dipilih untuk melakukan reviu Laporan      Reviewer appointed to conduct a review of PT
Pendanaan Berkelanjutan PT Sarana Multi               Sarana Multi Infrastruktur (PT SMI) Sustainable
Infrastruktur (PT SMI) Tahun 2025, dimana             Funding Report 2025, which constitutes a
pendanaan yang telah direalisasikan merupakan         Sustainability Bond issuance in accordance with OJK
Efek Bersifat Utang Keberlanjutan (Sustainability     Regulation (POJK) No. 18/2023. The External
Bond) sesuai dengan POJK No. 18 Tahun 2023.           Reviewer has relevant experience and qualified
Eksternal Reviu memiliki kompetensi pengalaman        competencies in sustainability activities (attached).
dan berijazah yang relevan dalam kegiatan
keberlanjutan (terlampir).

Tanggung Jawab Manajemen                              Management Responsibilities
Tanggung jawab manajemen atas penyusunan dan          Management is responsible for the preparation and
penyajian Laporan Pendanaan Berkelanjutan PT          presentation of the PT SMI Sustainable Funding
SMI Tahun 2025 yang mencakup Obligasi                 Report 2025 which covers the Shelf Registration
Keberlanjutan Berkelanjutan I Sarana Multi
                                                      Sustainability Bond I Sarana Multi Infrastruktur
Infrastruktur Tahap I Tahun 2025, dengan mengacu
                                                      Phase I Year 2025, in accordance with the PT SMI
pada Kerangka Pendanaan Berkelanjutan PT SMI.
                                                      Sustainable Funding Framework.

Tanggung Jawab Eksternal Reviu                        External Reviewer Responsibilities
Tanggung jawab Ahli Keberlanjutan adalah untuk        The Sustainability Expert's responsibility is to review
melakukan       reviu     Laporan       Pendanaan     the Shelf Registration Sustainability Bond I Sarana
Berkelanjutan PT SMI Tahun 2025 yang mencakup
                                                      Multi Infrastruktur Phase I Year 2025 report and
Obligasi Keberlanjutan Berkelanjutan I Sarana Multi
Infrastruktur Tahap I Tahun 2025 dan beberapa         other supporting documents, in accordance with
dokumen pendukung lainnya, sesuai ketentuan           the provisions of POJK No. 18 of 2023 concerning
POJK No. 18 Tahun 2023 tentang Penerbitan dan         the Issuance and Requirements of Debt Securities
Persyaratan Efek Bersifat Utang dan Sukuk             and Sukuk Based on Sustainability.
Berlandaskan Keberlanjutan.

Penyaluran dana hasil penerbitan Sustainability       The proceeds from the issuance of the Sustainability
Bond ke proyek Kegiatan Usaha Berwawasan              Bond have been allocated to selected
Lingkungan (KUBL) dan Kegiatan Usaha Berwawasan       environmental and social projects, with the
Sosial (KUBS) terpilih, dan ketersediaan estimasi
                                                      availability of estimated environmental and social
dampak lingkungan dan sosial dari proyek yang
dibiayai. Dana hasil penerbitan Sustainability Bond   impacts of the financed projects. The proceeds from
setelah dikurangi biaya-biaya penerbitan telah        the Sustainability Bond issuance, after deducting
dialokasikan secara penuh, dilaporkan dampak          issuance costs, have been fully allocated, with
tahunannya serta tidak ada perubahan terhadap         annual impact reporting provided and no changes
proyek yang dibiayai.                                 to the financed projects.

Kami melakukan reviu hanya pada dampak                Our review is limited to the environmental and
lingkungan dan sosial yang tertuang dalam Laporan     social impacts disclosed in the PT SMI Sustainable
Pendanaan Berkelanjutan Tahun 2025 sehubungan         Funding Report 2025 in relation to the Shelf
penerbitan Obligasi Keberlanjutan Berkelanjutan I
                                                      Registration Sustainability Bond I Sarana Multi
Sarana Multi Infrastruktur Tahap I Tahun 2025 untuk
pelaporan tahun 2025, yang disusun oleh tim PT        Infrastruktur Phase I Year 2025 for the 2025
SMI, berdasarkan data yang tersedia dalam laporan.    reporting period, as prepared by the PT SMI team,
                                                      based on data available in the report.
Page 34
Hasil Reviu                                              Review results
Berdasarkan reviu yang telah dilakukan, dapat            Based on the review that has been conducted, it can
disimpulkan:                                             be concluded:
1) Pemilihan proyek KUBL dan KUBS dalam                  1) The selection of environmental and social
     penyaluran dana hasil penerbitan Obligasi               projects allocated from proceeds of Shelf
     Keberlanjutan Berkelanjutan I Sarana Multi              Registration Sustainability Bond I Sarana Multi
     Infrastruktur Tahap I Tahun 2025 untuk                  Infrastruktur Phase I Year 2025 for the 2025
    pelaporan tahun 2025 telah sesuai dengan                 reporting period is in accordance with the
    Framework Pendanaan Berkelanjutan dan POJK               Sustainable Funding Framework and POJK No.
     No. 18 Tahun 2023.                                      18/2023.

2)   Dana hasil penerbitan Obligasi Keberlanjutan        2) The proceeds from the issuance of Shelf
     Berkelanjutan I Sarana Multi Infrastruktur Tahap       Registration Sustainability Bond I Sarana Multi
     I Tahun 2025, sebagaimana tercantum dalam              Infrastruktur Phase I Year 2025, as stated in the
     Laporan Pendanaan Berkelanjutan PT SMI Tahun           PT SMI Sustainable Funding Report 2025, have
     2025, dialokasikan untuk pembiayaan kembali            been allocated for refinancing eligible
     proyek yang sesuai dengan KUBL dan KUBS dan            environmental and social projects, with 100%
     telah dialokasikan 100% serta tidak mengalami          of funds disbursed and no changes from the
     perubahan dari yang telah disetujui. Alokasi dana      originally approved allocation. The allocation of
     tersebut sebesar Rp600.000.000.000 (enam ratus         funds is IDR 600,000,000,000 (six hundred
     miliar rupiah) terdiri dari 49,8% untuk KUBL dan       billion rupiah) consisting of 49.8% for
     50,2% untuk pembiayaan KUBS, dengan total              environmental projects and 50.2% for social
     persentase alokasi dana adalah 100%. Hal ini           projects, with a total percentage of fund
     telah sesuai dengan keterangan di Halaman 9            allocation of 100%. This is in accordance with
     Laporan Pendanaan Berkelanjutan PT SMI Tahun           the information on Page 9 of the PT SMI
     2025.                                                  Sustainable Funding Report 2025.

3) Proyek energi terbarukan yang telah didanai           3) The renewable energy projects that have been
   yaitu Pembangkit Listrik Tenaga Surya (PLTS)             funded are the Bukit Indah Solar Power Plant
   Bukit Indah yang saat ini telah beroperasi dan           which is currently operating and the Rahu-2 Mini
   Pembangkit Listrik Tenaga Minihidro (PLTM)               Hydro Power Plant in the Construction phase. The
   Rahu-2 tahap konstruksi. Penghitungan estimasi           impact estimation calculation uses the Emission
   dampak menggunakan Faktor Emisi pada                     Factor in the Decree of the Minister of Energy and
   Keputusan Menteri Energi dan Sumber Daya                 Mineral Resources of the Republic of Indonesia
   Mineral RI Nomor 163. K/HK.02/MEM.S/2021                 Number 163. K/HK.02/MEM.S/2021 concerning
   tentang Penetapan Faktor Emisi Gas Rumah Kaca            the Determination of Greenhouse Gas Emission
   Sistem Kelistrikan. Untuk indikator yang                 Factors for Electrical Systems. The indicators used
   digunakan telah sesuai pada KUBL yang telah              are in accordance with the KUBL previously
   ditetapkan sebelumnya oleh PT SMI. Hasil                 determined by PT SMI. The results of the
   penghitungan estimasi emisi Gas Rumah Kaca               Greenhouse Gas emission estimation calculation
   telah sesuai dengan best practice untuk                  are in accordance with best practices for
   penghitungan emisi yang dihindari dari proyek            calculating avoided emissions from the first
   energi terbarukan yang pertama yaitu PLTS Kota           renewable energy project, namely the Bukit Indah
   Bukit Indah berlokasi di Provinsi Jawa Barat             City Solar Power Plant located in West Java
   dengan aktual produksi energi listrik per tahun          Province with an actual annual electrical energy
   adalah 131.116 MWh dengan aktual emisi Gas               production of 131,116 MWh with an actual
   Rumah Kaca (GRK) yang terhindarkan sebesar               avoided Greenhouse Gases (GHG) emissions of
   108.694 tonCO2eq, proyek ini melibatkan 18               108,694 tons of CO2eq, this project involves 18
   pekerja dan energi listrik yang dihasilkan untuk         workers and the electrical energy produced is for
   kebutuhan industri. Proyek ini mendukung SDGs            industrial needs. This project supports SDGs
   Nomor 1, 7, 8, 9, 10, 12, dan 13;                        Numbers 1, 7, 8, 9, 10, 12, and 13;

     Proyek energi terbarukan kedua yang dibiayai            The second renewable energy project funded is
     adalah PLTM Rahu-2, proyek ini sedang dalam             the Rahu-2 Mini Hydro Power Plant (PLTM), this
     tahap konstruksi, dan rencananya akan                   project is currently under construction, and is
     beroperasi pada September 2026 mendatang.               planned to be operational in September 2026.
Page 35
    Estimasi produksi energi listrik yang dihasilkan         The estimated annual electricity production is
    per tahun adalah 36.442 MWh dan estimasi                 36,442 MWh and the estimated additional
    kapasitas energi terbarukan yang bertambah               renewable energy capacity is 6.4 MW, with an
    sebanyak 6,4 MW, dengan estimasi emisi Gas               estimated avoided Greenhouse Gas (GHG)
    Rumah Kaca (GRK) yang terhindarkan adalah                emissions of 34,145 tons of CO2eq, the number
    34.145 tonCO2eq, jumlah pekerja selama tahap             of workers during the construction phase is 155
    konstruksi sebanyak 155 orang. Energi bersih             people. The clean energy that will be produced
    yang akan dihasilkan dapat digunakan oleh 7.000          can be used by 7,000 families. This project
    kepala keluarga. Proyek ini mendukung capaian            supports the achievement of SDGs Numbers 1,
    SDGs Nomor 1, 7, 8, 9, 10, 12, dan 13.                   7, 8, 9, 10, 12, and 13.

4) Perhitungan dampak dari kegiatan usaha               4) The impact of socially conscious business
   berwawasan sosial (KUBS) yaitu pembiayaan               activities (KUBS) is calculated through financing
   terhadap proyek infrastruktur dasar yang                affordable basic infrastructure projects. The
   terjangkau. Proyek yang dibiayai adalah Proyek          project being funded is the Nusantara Lima
   Satelit Nusantara Lima (N5) yang ditargetkan            Satellite Project (N5), which is targeted for
   akan beroperasi pada April 2026. Proyek ini             operation in April 2026. This project has a
   memiliki kapasitas hingga 160 Gbps (140 Gbps            capacity of up to 160 Gbps (140 Gbps domestic,
   domestik, 20 Gbps internasional). Dibangun              20 Gbps international). Built on the Boeing
   dengan platform Boeing 702MP dan teknologi              702MP platform and Very High Throughput
   Very High Throughput Satellite (VHTS) dengan            Satellite (VHTS) technology, it will have an
   masa operasi lebih dari 15 tahun, serta didukung        operational life of over 15 years and is supported
   delapan stasiun bumi di Indonesia. N5                   by eight ground stations across Indonesia. N5 is
   diharapkan memperluas akses layanan digital,            expected to expand access to digital services,
   pendidikan, kesehatan, UMKM, dan konektivitas           education, health, MSMEs, and connectivity in
   di daerah 3T (Tertinggal, Terdepan, dan                 remote areas (underdeveloped, frontier, and
   Terluar). Indikator yang dipenuhi adalah                outermost). The indicator met is that 3,920
   sebanyak 3.920 desa pada 514 kota/kabupaten             villages in 514 cities/regencies will receive access
   yang akan mendapat akses dari layanan satelit           to this satellite service. The project will employ
   ini. Proyek ini telah mempekerjakan 39 orang            39 people once operational. This project
   pada saat beroperasi nanti. Proyek ini                  supports SDGs 3, 4, 5, 8, 9, and 10.
   mendukung capaian SDGs Nomor 3, 4, 5, 8, 9,
   dan 10.




                                            Jakarta, 17 April 2026
                                           Jakarta, April 17th 2026




   Dr. Triarko Nurlambang, MA.                                                   Dr. Sri Mariati, M.Si
Page 36
PT Sarana Multi Infrastruktur (Persero)
    Sahid Sudirman Center, 47th – 48th Floor
          Jl. Jenderal Sudirman No. 86
             Jakarta 10220, Indonesia
        Tel: (62-21) 8082 5288 (hunting)
              Fax: (62-21) 8082 5258

               www.ptsmi.co.id
              corsec@ptsmi.co.id
                ir@ptsmi.co.id


@ptsmi            PT Sarana Multi Infrastruktur (Persero)


@ptsmi            PT Sarana Multi Infrastruktur (Persero)
Page 37
2025   Laporan Tahunan
       Annual Report




        Tahun Transformasi Tangguh
                   dan Kekuatan Berkelanjutan
              A Year of Resilient Transformation and Enduring Strength




                           PT Sarana Multi Infrastruktur (Persero)
Page 38
2
    PT Sarana Multi Infrastruktur (Persero) · Laporan Tahunan 2025
Page 39
 SANGGAHAN DAN BATASAN TANGGUNG JAWAB
                                                                                                DISCLAIMER




Laporan Tahunan ini memuat pernyataan kondisi             This Annual Report contains statements regarding the
keuangan, hasil operasi, proyeksi, rencana, strategi,     financial condition, operational results, projections, plans,
kebijakan, serta tujuan Perseroan, yang digolongkan       strategies, policies, and objectives of the Company, which
sebagai pernyataan ke depan dalam pelaksanaan             are classified as forward-looking statements under
perundang-undangan yang berlaku, kecuali hal-hal          prevailing laws and regulations, except for historical
yang bersifat historis. Pernyataan-pernyataan tersebut    matters. These statements involve prospects, risks, and
memiliki prospek risiko, ketidakpastian, serta dapat      uncertainties, which may result in actual developments
mengakibatkan perkembangan aktual secara material         that materially differ from those reported.
berbeda dari yang dilaporkan.

Pernyataan-pernyataan prospektif dalam Laporan            The forward-looking statements in this Annual Report are
Tahunan ini dibuat berdasarkan berbagai asumsi            based on various assumptions regarding PT SMI’s current
mengenai kondisi terkini dan kondisi mendatang PT SMI     and future conditions, as well as the business environment
serta lingkungan bisnis di mana Perseroan menjalankan     in which the Company operates. These statements do not
kegiatan usaha. Pernyataan yang terdapat di Laporan       constitute a guarantee of future performance, as actual
Tahunan ini bukan menjadi jaminan kinerja di masa         results may vary due to factors beyond the Company’s
yang akan datang, karena hasil sebenarnya di masa         control.
depan dapat berbeda karena dapat dipengaruhi oleh
beberapa faktor di luar kendali Perseroan.

Laporan Tahunan ini memuat kata “PT SMI”, “Perseroan”     This Annual Report refers to “PT SMI,” “the Company,” and
dan “Kami” yang didefinisikan sebagai PT Sarana Multi     “We”, which are defined as PT Sarana Multi Infrastruktur
Infrastruktur (Persero) yang menjalankan kegiatan usaha   (Persero), a company engaged in infrastructure financing.
di bidang pembiayaan infrastruktur. Penyebutan satuan     References to the currency units “Rupiah”, and “IDR”
mata uang “Rupiah”, “Rp” merujuk pada mata uang resmi     pertain to the official currency of the Republic of Indonesia.
Republik Indonesia. Semua informasi keuangan disajikan    All financial information is presented in Rupiah.
dalam mata uang Rupiah.


                                                                                                                           PT Sarana Multi Infrastruktur (Persero) · Annual Report 2025




                                                                                                                                                 3

File

File Open PDF
Source IDX
Size12.51 MB
Published27 Apr 2026
Pages39
Characters145,142
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 74 people and organisations named in the text · linked when the evidence is strong

linked person Reynaldi Hermansjah p.6 ×2
linked org Dana Pensiun p.17
linked org Mandiri Sejahtera p.26 ×2
linked org Multi | Sarana p.33 ×2
possible org Otoritas Jasa Keuangan p.7 ×3
possible org Bursa Efek Indonesia p.7 ×2
possible org Negara Republik Indonesia p.8
possible org PT Sarana Multi p.33 ×2
unresolved org PT SMI About p.5 ×7
unresolved org PT SMI p.5 ×78
unresolved org PT SMI Sustainable Funding Under p.5 ×3
unresolved org PT SMI’s Sustainable Funding p.5
unresolved org Kementerian Keuangan Republik Indonesia p.6 ×2
unresolved org Ministry of Finance p.6 ×3
unresolved org Financial Services Authority p.7 ×3
unresolved org Indonesia Stock Exchange p.7 ×2
unresolved org PT SMI Tentang p.8
unresolved org PT SMI Struktur p.8
unresolved org PT SMI Structure p.8
unresolved org PT SMI Visi p.8
unresolved org Kementerian Keuangan Menjadi p.8
unresolved org Ministry of Finance To p.8
unresolved org Menteri Keuangan p.9
unresolved org Minister of Finance Regulation p.9
unresolved org PT SMI’s p.9 ×6
unresolved org PT SMI Pelaksanaan Mandat p.10
unresolved org PT SMI’s Mandate p.10
unresolved org PT SMI Pilar Bisnis p.11
unresolved org PT SMI Langkah Nyata p.12
unresolved org PT SMI’s Green Bond Framework. p.12 ×2
unresolved org PT SMI Sustainable Financing Framework p.13
unresolved org PT SMI’s Environmental p.14
unresolved org PT SMI Sustainable Funding. Proyek Hijau Proyek Biru p.14
unresolved org PT SMI’s Sustainable Financing Framework p.15
unresolved org PT SMI’s Sustainable Funding Framework Realisasi Pendanaan p.16
unresolved org PT SMI’s Sustainable Funding Framework Sebagai p.16
unresolved org Reksa Dana p.17
unresolved org PT SMI’s A p.18
unresolved org PT SMI’s Sustainable Funding Framework. p.18 ×2
unresolved org PT SMI Sustainable p.18
unresolved org PT SMI. Jenis Pembiayaan p.18
unresolved org PT SMI Environmental p.20
unresolved org Kementerian Keuangan p.22
unresolved org PT Aruna Hijau p.24
unresolved org PT PLN (Persero) p.24 ×3
unresolved org PT PLN Batam p.24 ×2
unresolved org PT Besland Pertiwi p.24 ×2
unresolved org PT Tatajabar Sejahtera p.24 ×2
unresolved org PT Asri Power Prima p.26 ×2
unresolved org PT Adidaya p.26
unresolved org PT Adidaya Mandiri Sejahtera p.26
unresolved org PT Asripower p.26 ×2
unresolved org PT PLN North Sumatra Perjanjian Pembelian Tenaga Listrik p.26
unresolved org PT Satelit Nusantara p.28
unresolved org PT Satelit Lima p.28
unresolved org PT Pasifik Satelit Nusantara p.28
unresolved org PT Pasifik Satelit p.28
unresolved org Ministry of Communication p.28
unresolved org Kementerian Komunikasi dan Digital p.28
unresolved org PT SMI. Beberapa p.30
unresolved org PT SMI Sustainable Funding Framework. Some p.30
unresolved org PT SMI’s Internal Auditor p.31
unresolved org PT SMI Sustainable Funding SMI Tahun p.33
unresolved org PT SMI. Sustainable Funding Framework. Tanggung Jawab Eksternal p.33
unresolved org PT SMI Tahun p.33 ×3
unresolved org PT SMI Sustainable Pendanaan Berkelanjutan Tahun p.33
unresolved org PT SMI Sustainable Funding p.34
unresolved org Minister of Energy p.34
unresolved org Menteri Energi dan Sumber Daya p.34
unresolved org PT SMI. Hasil p.34
unresolved person Dr. Triarko Nurlambang p.35
unresolved person Dr. Sri Mariati p.35 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result