              LAPORAN PENILAIAN PROPERTI/
            REPORT OF VALUATION OF PROPERTY

             (SUPERMARKET MITRA 10 CIBUBUR)
                                         DI/AT

                     JL. ALTERNATIF CIBUBUR KM 14
                        KELURAHAN JATIRANGGA
                      KECAMATAN JATISAMPURNA
                             KOTA BEKASI
                          PROPINSI JAWA BARAT

                               MILIK/ATAS NAMA
                              OF/ON THE NAME OF

                        BUDYANTO TOTONG
                            TANGGAL PENILAIAN/
                             DATE OF VALUATION
                              31 DESEMBER 2022/
                              DECEMBER 31, 2022




SUWENDHO RINALDY DAN REKAN
KANTOR JASA PENILAI PUBLIK
Nomor Izin Usaha KJPP: 2.09.0059                                    Kantor Cabang Jakarta
Nomor Izin Cabang KJPP: 1138/KM.1/2017                  Komplek Kalibata Indah Blok K16-17
Penilai Properti dan Bisnis                                    Jl. Rawajati Timur, Pancoran
                                                                      Jakarta Selatan 12750
                                                                 T (021) 7970913 / 7994521
                                                                           E ocky@srr.co.id
                                                           Wilayah Kerja: Seluruh Indonesia
                                                  Kantor Cabang: Jakarta (P/B), Bandung (P)
Page 2
               SUWENDHO RINALDY DAN REKAN
               KANTOR JASA PENILAI PUBLIK
                                                                                          Kantor Cabang Jakarta
               Nomor Izin Usaha KJPP: 2.09.0059                               Komplek Kalibata Indah Blok K16-17
               Nomor Izin Cabang KJPP: 1138/KM.1/2017                                Jl. Rawajati Timur, Pancoran
               Penilai Properti dan Bisnis                                                  Jakarta Selatan 12750
                                                                                       T (021) 7970913 / 7994521
                                                                                                 E ocky@srr.co.id
                                                                                 Wilayah Kerja: Seluruh Indonesia
                                                                        Kantor Cabang: Jakarta (P/B), Bandung (P)



      No. : 00165/2.0059-02/PI/10/0242/1/III/2023                        14 Maret 2023/March 14, 2023



      Kepada Yth./Messrs.

      PT CATUR SENTOSA ADIPRANA Tbk
      Jl. Raya Daan Mogot No. 234
      Wijaya Kusuma
      Jakarta 11510

      U.p./Attn.   : Direksi
                     Director

      Hal/Re       : Penilaian Properti Milik/Atas Nama Budyanto Totong/
                     Valuation of Property of/on the Name of Budyanto Totong



      Dengan hormat,                                      Dear Sirs,

      Sehubungan dengan penugasan yang diberikan          In accordance with the assignment given to us,
      kepada kami, Kantor Jasa Penilai Publik             Kantor Jasa Penilai Publik (KJPP) Suwendho
      (KJPP) Suwendho Rinaldy dan Rekan (“SRR”            Rinaldy dan Rekan (“SRR” or “we”), by the
      atau “kami”), oleh manajemen PT Catur               management       of     PT    Catur    Sentosa
      Sentosa Adiprana Tbk (“Perseroan”) untuk            Adiprana Tbk (“the Company”) to provide our
      memberikan      pendapat       sebagai   penilai    opinion as an independent valuer on the
      independen atas nilai pasar (market value)          market value of property of/on the name of
      properti milik/atas nama Budyanto Totong            Budyanto Totong (“BT”) i.e. Mitra 10 Cibubur
      (“BT”) yang berupa Supermarket Mitra 10             Supermarket (land [22,919.00 m²], buildings
      Cibubur (tanah [20.919,00 m²], bangunan             [22,070.00 m²], and other land improvements)
      [22.070,00 m²], dan sarana pelengkap lainnya)       located at Jl. Alternatif Cibubur Km 14,
      yang terletak di Jl. Alternatif Cibubur Km 14,      Kelurahan         Jatirangga,       Kecamatan
      Kelurahan         Jatirangga,        Kecamatan      Jatisampurna, Kota Bekasi, Propinsi Jawa
      Jatisampurna, Kota Bekasi, Propinsi Jawa            Barat (“the Object of Valuation”), as stated in
      Barat (“Obyek Penilaian”), sesuai dengan surat      our offering letter No. 230111.002/SRR-
      penawaran      kami       No.230111.002/SRR-       JK/SPN-A/CSAP/OR dated January 11, 2023
      JK/SPN-A/CSAP/OR tanggal 11Januari 2023            which was approved by the management of the
      yang telah disetujui oleh Perseroan, maka           Company, herewith we as an official KJPP
      dengan ini kami sebagai KJPP resmi dengan           with a Business License No. 2.09.0059 based
      Izin Usaha No. 2.09.0059 berdasarkan                on Decree of Minister of Finance No.
      Keputusan            Menteri           Keuangan     1056/KM.1/2009 dated August 20, 2009
      No. 1056/KM.1/2009 tanggal 20 Agustus               declared that we have inspected and valued the
      2009, menyatakan bahwa kami telah                   Object of Valuation to deliver our opinion on
      melakukan penilaian atas Obyek Penilaian            the market value of the Object of Valuation as
      dengan tujuan untuk mengungkapkan pendapat          of December 31, 2022.
      mengenai nilai pasar dari Obyek Penilaian
      pada tanggal 31 Desember 2022.


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                         i
Page 3
      RUANG LINGKUP PENUGASAN                             SCOPE OF WORK

      1. Status Penilai                                   1. Valuer Status

         Penilai Publik Ocky Rinaldy merupakan              Public Appraiser Ocky Rinaldy is an
         penilai independen yang bernaung dalam             independent appraiser under SRR based on
         SRR berdasarkan Izin Penilai Publik                Public Appraiser License No. PB-
         No. PB-1.09.00242 dengan kualifikasi               1.09.00242 with Property and Business
         Penilaian Properti dan Bisnis yang terdaftar       Valuation qualifications which registered as
         sebagai profesi penunjang pasar modal di           a capital market supporting profession in
         Otoritas Jasa Keuangan (“OJK”) dengan              the Financial Services Authority (Otoritas
         Surat Tanda Terdaftar (STTD) Profesi               Jasa Keuangan or “OJK”) with a Letter of
         Penunjang Pasar Modal No. STTD.PPB-                Registration as Capital Market Supporting
         05/PM.2/2018 tanggal 4 Juni 2018                   Profession (Surat Tanda Terdaftar [STTD]
         (Penilaian Properti dan Bisnis) (pengganti         Profesi Penunjang Pasar Modal) No.
         dari STTD No. 02/BL/STTD-P/AB/2006                 STTD.PPB-05/PM.2/2018 dated June 4,
         tanggal 31 Mei 2006 [Penilai Properti dan          2018 (Property and Business Valuation)
         Penilai Usaha]) dan bertindak untuk                (extension of STTD No. 02/BL/STTD-
         melakukan penilaian secara obyektif tanpa          P/AB/2006 dated May 31, 2006 [Property
         ada benturan kepentingan dan memiliki              Valuer and Business Valuer]) and act to
         kompetensi untuk melakukan penugasan               carry out an objective valuation without any
         sebagaimana yang dimaksud dalam lingkup            conflict of interest and have the competence
         penugasan ini.                                     to carry out the valuation as referred to in
                                                            the scope of this assignment.

      2. Pemberi Tugas dan Pengguna Laporan               2. The Assignor and the User of Report

         Pemberi tugas adalah Perseroan, atau               The assignor is the Company, or PT Catur
         PT Catur Sentosa Adiprana Tbk. Perseroan           Sentosa Adiprana Tbk. The Company is a
         adalah sebuah perseroan terbatas berstatus         public company engaged in the trading of
         perusahaan terbuka (public company) yang           industrial goods, especially building
         bergerak di bidang perdagangan barang              materials and consumer goods. The
         industri khususnya bahan bangunan dan              Company is headquartered at Jl. Raya Daan
         barang konsumsi. Perseroan berkantor pusat         Mogot No. 234, Wijaya Kusuma, Jakarta
         di Jl. Raya Daan Mogot No. 234, Wijaya             11510, with telephone number (021)
         Kusuma, Jakarta 11510, dengan nomor                5668801, facsimile number (021) 5669445,
         telepon (021) 5668801, nomor faksimile             email address corsec@csahome.com, and
         (021)      5669445,      alamat      email         website address www.csahome.com.
         corsec@csahome.com, dan alamat website
         www.csahome.com.

         Pengguna laporan penilaian              Obyek      The user of the valuation report of the
         Penilaian adalah Perseroan.                        Object of Valuation is the Company.

      3. Obyek Penilaian dan Kepemilikan                  3. Object of Appraisal and Ownership

         Obyek yang dinilai dalam penilaian ini             The object being valued in this valuation is
         adalah Obyek Penilaian, yaitu properti             the Object of Valuation, i.e. property of/on
         milik/atas nama BT yang berupa                     the name of BT i.e. Supermarket Mitra 10
         Supermarket Mitra 10 Cibubur (tanah                Cibubur (land [22,919.00 m²], buildings
         [20.919,00 m²], bangunan [22.070,00 m²],           [22,070.00    m²],    and      other    land
         dan sarana pelengkap lainnya) yang terletak        improvements) located at Jl. Alternatif
         di Jl. Alternatif Cibubur Km 14, Kelurahan         Cibubur Km 14, Kelurahan Jatirangga,
         Jatirangga, Kecamatan Jatisampurna, Kota           Kecamatan Jatisampurna, Kota Bekasi,

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                               ii
Page 4
         Bekasi, Propinsi Jawa Barat.                     Propinsi Jawa Barat.

         Obyek       Penilaian     merupakan     aset     The Object of Valuation is an operational
         operasional dari Perseroan. Berdasarkan          asset of the Company. Based on regulation
         Peraturan OJK No. 28/POJK.04/2021                OJK      No.      28/POJK.04/2021,        dated
         tanggal 28 Desember 2021 tentang                 December 28, 2021, about “Penilaian dan
         “Penilaian dan Penyajian Laporan Penilaian       Penyajian Laporan Penilaian Properti di
         Properti di Pasar Modal” (“POJK                  Pasar Modal” (“POJK 28/2021”), Operating
         28/2021”), aset operasional didefinisikan        assets were defined as "assets used in the
         sebagai “aset yang digunakan dalam               company's operations which are used
         operasional perusahaan yang digunakan            sustainably", while non-operating assets
         secara berkelanjutan”, sedangkan aset non        were defined as "assets that are separated
         operasional didefinisikan sebagai “aset          from the company's operations consisting of
         yang      terpisahkan     dari  operasional      assets that will be used in the future, surplus
         perusahaan yang terdiri atas aset yang akan      assets, or investment assets".
         dipakai pada masa yang akan datang, aset
         surplus, atau aset investasi”.

         Obyek Penilaian dilengkapi dengan                The Object of Valuation is covered by
         8 (delapan) buah dokumen kepemilikan             8 (eight) land ownership documents as
         tanah yaitu sebagai berikut:                     follow:

         a. Sertifikat Hak Milik (SHM) No. 00322          a. Freehold Title Certificate (SHM)
            yang diterbitkan di Bekasi pada tanggal          No. 00322 issued in Bekasi, dated
            5 Desember 2005, terakhir tercatat atas          December 5, 2005, registered on the
            nama Budyanto Totong, dengan Surat               name of Budyanto Totong, and Letter of
            Ukur No. 661/Jatirangga/2005 tanggal             Measurement No. 661/Jatirangga/2005,
            15November 2005, di Kelurahan                   dated November 15, 2005, at Kelurahan
            Jatirangga, Kecamatan Jatisampurna,              Jatirangga, Kecamatan Jatisampurna,
            Kota Bekasi, Propinsi Jawa Barat, luas           Kota Bekasi, Propinsi Jawa Barat for
            1.190,00 m².                                     1,190.00 m² area of land.

         b. SHM No. 00335 yang diterbitkan di             b. SHM No. 00335 issued in Bekasi, dated
            Bekasi pada tanggal 3 April 2006,                April 3, 2006, registered on the name of
            terakhir tercatat atas nama Budyanto             Budyanto Totong, and Letter of
            Totong,      dengan      Surat     Ukur          Measurement No. 673/Jatirangga/2006,
            No. 673/Jatirangga/2006          tanggal         dated March 9, 2006, at Kelurahan
            9Maret 2006, di Kelurahan Jatirangga,           Jatirangga, Kecamatan Jatisampurna,
            Kecamatan Jatisampurna, Kota Bekasi,             Kota Bekasi, Propinsi Jawa Barat for
            Propinsi Jawa Barat, luas 500,00 m².             500.00 m² area of land.

         c. SHM No. 00739 yang diterbitkan di             c. SHM No. 00739 issued in Bekasi, dated
            Bekasi pada tanggal 27 Juli 2011,                July 27, 2011, registered on the name of
            terakhir tercatat atas nama Budyanto             Budyanto Totong, and Letter of
            Totong,      dengan     Surat    Ukur            Measurement No. 22/Jatirangga/2010,
            No. 22/Jatirangga/2010        tanggal            dated October 27, 2010, at Kelurahan
            27Oktober 2010, di Kelurahan                    Jatirangga, Kecamatan Jatisampurna,
            Jatirangga, Kecamatan Jatisampurna,              Kota Bekasi, Propinsi Jawa Barat for
            Kota Bekasi, Propinsi Jawa Barat, luas           1,068.00 m² area of land.
            1.068,00 m².




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                iii
Page 5
         d. SHM No. 01576 yang diterbitkan di             d. SHM No. 01576 issued in Bekasi, dated
            Bekasi pada tanggal 29 Agustus 2012,             August 29, 2012, registered on the name
            terakhir tercatat atas nama Budyanto             of Budyanto Totong, and Letter of
            Totong,      dengan      Surat     Ukur          Measurement No. 66/Jatirangga/2012,
            No. 66/Jatirangga/2012           tanggal         dated July 16, 2012, at Kelurahan
            16Juli 2012, di Kelurahan Jatirangga,           Jatirangga, Kecamatan Jatisampurna,
            Kecamatan Jatisampurna, Kota Bekasi,             Kota Bekasi, Propinsi Jawa Barat for
            Propinsi Jawa Barat, luas 181,00 m².             181.00 m² area of land.

         e. SHM No. 01607 yang diterbitkan di             e. SHM No. 01607 issued in Bekasi, dated
            Bekasi pada tanggal 4 Februari 2013,             February 4, 2013, registered on the
            terakhir tercatat atas nama Budyanto             name of Budyanto Totong, and Letter of
            Totong,      dengan      Surat     Ukur          Measurement      No. 1/Jatirangga/2013,
            No. 1/Jatirangga/2013            tanggal         dated January 7, 2013, at Kelurahan
            7Januari 2013, di Kelurahan Jatirangga,         Jatirangga, Kecamatan Jatisampurna,
            Kecamatan Jatisampurna, Kota Bekasi,             Kota Bekasi, Propinsi Jawa Barat for
            Propinsi Jawa Barat, luas 451,00 m².             451.00 m² area of land.

         f. SHM No. 01661 yang diterbitkan di             f. SHM No. 01661 issued in Bekasi, dated
            Bekasi pada tanggal 12 Desember 2012,            December 12, 2012, registered on the
            terakhir tercatat atas nama Budyanto             name of Budyanto Totong, and Letter of
            Totong,      dengan     Surat    Ukur            Measurement No. 67/Jatirangga/2013,
            No. 67/Jatirangga/2013         tanggal           dated September 10, 2013, at Kelurahan
            10September 2013,     di    Kelurahan           Jatirangga, Kecamatan Jatisampurna,
            Jatirangga, Kecamatan Jatisampurna,              Kota Bekasi, Propinsi Jawa Barat for
            Kota Bekasi, Propinsi Jawa Barat, luas           1,695.00 m² area of land.
            1.695,00 m².

         g. SHM No. 01682 yang diterbitkan di             g. SHM No. 01682 issued in Bekasi, dated
            Bekasi pada tanggal 24 Januari 2005,             January 24, 2005, registered on the
            terakhir tercatat atas nama Budyanto             name of Budyanto Totong, and Letter of
            Totong,      dengan     Surat     Ukur           Measurement No. 2999/Jatikarya/2005,
            No. 2999/Jatikarya/2005        tanggal           dated January 7, 2005, at Kelurahan
            7Januari 2005, di Kelurahan Jatikarya,          Jatikarya, Kecamatan Jatisampurna,
            Kecamatan Jatisampurna, Kota Bekasi,             Kota Bekasi, Propinsi Jawa Barat for
            Propinsi Jawa Barat, luas 604,00 m²;             604.00 m² area of land; and
            dan

         h. SHM No. 02364 yang diterbitkan di             h. SHM No. 02364 issued in Bekasi, dated
            Bekasi pada tanggal 27 Desember 2004,            December 27, 2004, registered on the
            terakhir tercatat atas nama Budyanto             name of Budyanto Totong, and Letter of
            Totong,      dengan     Surat    Ukur            Measurement No. 806/2017, dated
            No. 806/2017                   tanggal           September 22, 2017, at Kelurahan
            22September 2017,     di    Kelurahan           Jatikarya, Kecamatan Jatisampurna,
            Jatikarya, Kecamatan Jatisampurna,               Kota Bekasi, Propinsi Jawa Barat for
            Kota Bekasi, Propinsi Jawa Barat, luas           15,230.00 m² area of land.
            15.230,00 m².

         Luas keseluruhan tanah sesuai dengan             Total land area in accordance with the
         dokumen-dokumen     tersebut   adalah            documents is 20,919.00 m².
         20.919,00 m².




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                           iv
Page 6
      4. Mata Uang yang Digunakan                         4. Currency Used

         Nilai pasar dari Obyek Penilaian per               The market value of the Object of Valuation
         tanggal 31 Desember 2022 dinyatakan                as of the effective date of valuation, i.e.
         dalam mata uang Rupiah. Sebagai informasi          December 31, 2022, is stated in Rupiah
         tambahan, kurs tengah Bank Indonesia (BI)          (Rp)    currency.    As    an     additional
         untuk mata uang Dollar Amerika Serikat             information, the middle exchange rate of
         terhadap Rupiah pada tanggal penilaian             Bank Indonesia (BI) for US$ to Rp as of
         adalah 1 US$ = Rp 15.731,00.                       December 31, 2022 is Rp 15,731.00 per
                                                            US$.

      5. Maksud dan Tujuan Penilaian                      5. Objective and Purpose of the Valuation

         Tujuan penilaian Obyek Penilaian adalah            The objective of the valuation of the Object
         untuk memberikan pendapat tentang nilai            of Valuation is to obtain an independent
         pasar dari Obyek Penilaian pada tanggal            opinion regarding the market value of the
         31 Desember 2022 yang dinyatakan dalam             Object of Valuation as of the effective date
         mata uang Rupiah.                                  of valuation, i.e. December 31, 2022, stated
                                                            in Rupiah (Rp) currency.

         Maksud dari penilaian Obyek Penilaian              The purpose of the valuation of the Object
         adalah untuk memenuhi kebutuhan                    of Valuation is to provide needs the
         Perseroan dalam rangka kepentingan                 Company for the purchase plan of the
         rencana pembelian Obyek Penilaian.                 Object of Valuation.

      6. Dasar Nilai                                      6. Basis of Value

         Untuk keperluan penilaian atas Obyek               For the purpose of the valuation of the
         Penilaian, standar nilai yang kami                 Object of Valuation, value basis which we
         pergunakan dalam laporan penilaian ini             use in this valuation report is the market
         adalah nilai pasar (market value), yang            value. Based on POJK 28/2021, market
         berdasarkan POJK 28/2021 didefinisikan             value is defined as “the estimated amount or
         sebagai “estimasi sejumlah uang yang dapat         paid for exchange an asset or liability
         diperoleh atau dibayar dari hasil penukaran        should exchange on the date of valuation
         suatu aset atau liabilitas pada tanggal            between a willing buyer and a willing seller
         Penilaian, antara pembeli yang berminat            in an arm's-length transaction, after proper
         membeli dengan penjual yang berminat               marketing and where the parties had each
         menjual, dalam suatu transaksi bebas               acted knowledgeably, prudently, and
         ikatan, yang pemasarannya dilakukan                without compulsion”.
         secara layak, dimana kedua pihak masing-
         masing bertindak atas dasar pemahaman
         yang dimilikinya, kehati-hatian, dan tanpa
         paksaan”.

      7. Tanggal Penilaian                                7. Date of Valuation

         Tanggal penilaian ditetapkan pada tanggal          The market value of the Object of Valuation
         31 Desember 2022. Tanggal ini dipilih atas         is estimated as at December 31, 2022. This
         pertimbangan kepentingan dan tujuan                date was chosen based on the considerations
         penilaian.                                         of the objective and purpose of the
                                                            valuation.




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                               v
Page 7
      8. Tingkat Kedalaman Investigasi                     8. Depth of Investigation

         Batasan dalam melakukan inspeksi,                   The limitations on conducting inspections,
         penelaahan, dan analisis untuk definisi             reviews, and analyzes for the definition of
         penugasan di atas adalah sebagai berikut:           assignment above are as follows:

         a. Proses pengumpulan, verifikasi dan               a. The process of collecting, verifying and
            analisis data dilakukan secara langsung             analyzing data is carried out directly on
            pada Obyek Penilaian. Bila pada Obyek               the Object of Valuation. If there are
            Penilaian dijumpai keterbatasan untuk               limitations on the Object of Valuation to
            dijangkau dan/atau diversifikasi secara             be reached and/or verified as a whole,
            keseluruhan, maka kami menggunakan                  then we use data collection by sampling
            pendataan     secara    sampling    dan             and interviewing the relevant parties.
            wawancara dari pihak yang relevan.

         b. Inspeksi dapat dilakukan tanpa ada               b. Inspections can be carried out without
            pembatasan akses ke Obyek Penilaian,                any restrictions on access to the Object
            termasuk data yang harus disediakan                 of Valuation, including data that must be
            oleh pemberi tugas dan/atau pihak terkait           provided by the assignor and/or other
            lainya.                                             related parties.

         c. Segala   sesuatu    yang   membatasi             c. Anything that limits this assignment will
            penugasan ini akan dicatatkan sebagai               be recorded as a binding part of the
            bagian yang mengikat atas hasil                     results of the assignment.
            penugasan yang dilakukan.

      9. Sifat dan Sumber Informasi                        9. Nature and Reliable Sources of
                                                              Information

         Dalam penilaian Obyek Penilaian, sumber             In evaluating the Object of Valuation, the
         data dan informasi yang digunakan                   sources of data and information used
         diantaranya berasal dari:                           include:

         a. BI;                                              a. BI;

         b. Lembaga resmi pemerintah atau swasta             b. Official     government       or   private
            yang mempublikasi data informasi                    institutions that publish information data
            terkait dengan Obyek Penilaian dan/atau             related to the Object of Valuation and/or
            aset lainnya yang relevan;                          other relevant assets;

         c. Badan Pusat Statistik (BPS); dan/atau            c. Central Bureau of Statistics (BPS);
                                                                and/or

         d. Media tulis dan elektronik resmi yang            d. Official written and electronic media
            terbukti    kebenaran     data    dan               whose data and information are proven
            informasinya.                                       correct.

    10. Asumsi-Asumsi dan Kondisi Pembatas                10. Main Assumptions

         Kami tegaskan bahwa dalam penilaian ini             In accordance with Kode Etik Penilai
         kami tidak memperhitungkan biaya dan                Indonesia dan Standar Penilaian Indonesia
         pajak yang terjadi karena adanya jual beli,         Edisi VII Tahun 2018 (“KEPI & SPI”), in
         sesuai dengan yang diatur di dalam Kode             this valuation we do not consider the
         Etik Penilai Indonesia dan Standar                  expenses and taxes which will occur due to

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                 vi
Page 8
         Penilaian Indonesia Edisi VII Tahun 2018            the sale and/or purchase of the Object of
         (“KEPI & SPI”).                                     Valuation.

         Dalam penilaian ini kami berasumsi bahwa:           In this valuation we assume that:

         a. Nilai yang tercantum dalam laporan ini           a. The value stated in this report and any
            serta setiap nilai lain dalam laporan ini           other values which constitute parts of the
            yang merupakan bagian dari Obyek                    Object of Valuation are only valid in
            Penilaian hanya berlaku sesuai dengan               accordance with the objective and
            tujuan dan maksud penilaian. Nilai yang             purpose of this valuation. The values
            dinyatakan dalam laporan penilaian ini              stated in this report cannot be used for
            tidak dapat digunakan untuk tujuan                  other valuation purposes to avoid
            penilaian lain yang dapat mengakibatkan             misinterpretation.
            terjadinya kesalahan.

         b. Obyek Penilaian dilengkapi dengan                b. The Object of Valuation is covered with
            dokumen kepemilikan/penguasaan yang                 ownership documents which are legally
            sah       secara       hukum,        dapat          valid, transferable, and free of any
            dialihkan/dipindahtangankan, dan bebas              encumbrances, claims, or any limitation
            dari ikatan, tuntutan atau batasan apapun           other than those stated in this report.
            selain yang disebutkan dalam laporan ini.

         c. Obyek Penilaian merupakan satu                   c. The Object of Valuation valued in this
            kesatuan usaha yang dikelola oleh                   valuation constitutes a whole business
            manajemen yang kompeten.                            entity    managed      by    competent
                                                                management.

         d. Batasan lainnya, kondisi, komentar, dan          d. Other limitation, conditions, comments,
            detail telah tercantum di dalam laporan             and details are written in this report.
            ini.

         Kami tidak melakukan penyelidikan dan               We did not investigate, and we assume no
         juga bukan merupakan tanggung jawab                 responsibility for matters of a legal nature
         kami kemungkinan terjadinya masalah yang            affecting the Object of Valuation or the title
         berkaitan     dengan     status   hukum             thereto.
         kepemilikan, kewajiban utang dan/atau
         sengketa atas Obyek Penilaian.

         Kami tegaskan pula bahwa kami tidak                 We have no present or contemplated future
         memperoleh manfaat atau keuntungan                  interest in the Object of Valuation and
         apapun dari Obyek Penilaian yang kami               neither the employment to make the
         nilai serta nilai yang kami laporkan, baik          appraisal, nor the compensation for it, is
         pada saat ini maupun di masa yang akan              contingent upon the appraised value of the
         datang.                                             Object of Valuation.

    11. Persyaratan dan Tujuan Publikasi                  11. Requirements for Consent to Publication

         KJPP Suwendho Rinaldy dan Rekan tidak               KJPP Suwendho Rinaldy dan Rekan does
         memperkenankan penggunaan seluruh,                  not allow the use of this report either in part
         ataupun sebagian dari laporan penilaian ini         or in whole as a reference in the form of
         sebagai rujukan dalam bentuk dokumen,               document,      circular,    statement,     and
         edaran, pernyataan, referensi ataupun               references or publication in any form
         dipublikasikan dalam bentuk apapun juga             without prior written consent from KJPP
         tanpa izin tertulis dari KJPP Suwendho              Suwendho Rinaldy dan Rekan and/or

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                  vii
Page 9
         Rinaldy dan Rekan dan/atau Pemberi                  the Assignor.
         Tugas.

    12. Konfirmasi Bahwa Penilaian Dilakukan              12. Confirmation That the Valuation is
        Berdasarkan KEPI & SPI                                Based on KEPI & SPI

         Penilaian   ini dilaksanakan           dengan       This valuation was conducted in compliance
         memenuhi ketentuan-ketentuan            dalam       with the provisions of KEPI & SPI.
         KEPI & SPI.


      TANGGAL INSPEKSI                                     DATE OF INSPECTION

      Peninjauan fisik atas Obyek Penilaian                The physical inspection of the Object of
      dilakukan pada tanggal 7 Februari 2023.              Valuation was conducted on February 7 , 2023.


      DATA DAN INFORMASI YANG                              DATA AND INFORMATION USED
      DIGUNAKAN

      Dalam      melakukan     penilaian      untuk        In conducting the valuation to estimate the
      memperkirakan nilai pasar dari Obyek                 market value of the Object of Valuation, we
      Penilaian,      kami    telah      menelaah,         have reviewed, considered, referred to, or
      mempertimbangkan,        mengacu,        atau        performed procedures on the data and
      melaksanakan prosedur atas data dan informasi        information as follows:
      sebagai berikut:

      1. Salinan SHM,                                      1. Copy of SHM,

      2. Salinan Surat Pemberitahuan Pajak                 2. Copy of notification of land and building
         Terhutang Pajak Bumi dan Bangunan                    taxes (SPPT PBB),
         (SPPT PBB),

      3. Gambar layout bangunan,                           3. Layout of buildings,

      4. Data hasil inspeksi lapangan, dan                 4. Results of physical site inspection; and

      5. Dokumen lainnya          yang    berhubungan      5. Other documents related to the valuation.
         dengan penilaian.


      KEJADIAN PENTING SETELAH                             SIGNIFICANT EVENTS SUBSEQUENT TO
      TANGGAL PENILAIAN                                    THE ASSESSMENT DATE

      Dari tanggal penilaian, yaitu tanggal                From the date of valuation, i.e. December 31,
      31 Desember 2022, sampai dengan tanggal              2022, until the date of issuance of this
      diterbitkannya laporan ini, tidak terdapat           valuation report, there are no significant events
      kejadian penting yang dapat mempengaruhi             that may affect the results of the valuation
      hasil penilaian secara signifikan.                   significantly.




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                   viii
Page 10
      PENDEKATAN PENILAIAN                                VALUATION APPROACH

      Pendekatan-pendekatan yang digunakan dalam          Approaches applied in this valuation are as
      penilaian ini adalah sebagai berikut:               follows:
      - Pendekatan Pendapatan                             - Income Approach

         Dalam melakukan penilaian Obyek                    In the valuation of the Object of Valuation
         Penilaian yang berupa properti yang                in the form of property that has the potential
         memiliki potensi untuk menghasilkan                to generate income but is relatively simple,
         pendapatan namun relatif sederhana,                the valuation method used is the Gross
         metode penilaian yang digunakan adalah             Income Multiplier method.
         metode Gross Income Multiplier (GIM).


         Dalam penilaian menggunakan metode                 In the valuation used the GIM method, an
         GIM, indikasi nilai pasar Obyek Penilaian          indication of the market value of the Object
         dihasilkan dari konversi pendapatan kotor          of Valuation is generated from the
         tahunan (potential gross income/PGI) yang          conversion of potential gross annual income
         mencerminkan dan mewakili pendapatan               (PGI) that reflects and represents the future
         tahunan Obyek Penilaian di masa yang akan          annual income of the Object of Valuation
         datang dengan konstanta tertentu yang biasa        with a certain constant commonly referred
         disebut dengan GIM.                                to as GIM.

         Untuk melaksanakan penilaian dengan                For conducting the valuation used the GIM
         metode GIM, kami memperhatikan                     method, we consider sales and leases of
         penjualan dan sewa properti yang sebanding         comparable and similar properties that have
         dan sejenis serta memiliki kesamaan                similar characteristics in terms of physical,
         karakteristik baik dalam hal fisik, lokasi,        location, and investment characteristics, if
         dan karakteristik investasi, bila ada,             any, records, interviews with persons or
         pencatatan-pencatatan,         wawancara-          officials and other property owners who are
         wawancara dengan orang-orang atau                  familiar with property values and rents in
         pejabat-pejabat    dan     pemilik-pemilik         the area and comparable offers. The data is
         properti lainnya yang mengetahui benar             then analyzed to obtain the GIM of the
         mengenai nilai-nilai properti dan harga            Object of Valuation.
         sewa di daerah itu serta penawaran yang
         sebanding. Data tersebut kemudian
         dianalisa untuk memperoleh GIM dari
         Obyek Penilaian.

         Untuk mendapatkan indikasi nilai pasar             To obtain an indication of the market value
         Obyek Penilaian, GIM yang telah diperoleh          of the Object of Valuation, the GIM that has
         tersebut dikalikan dengan PGI atau                 been obtained is multiplied by the PGI or
         pendapatan kotor tahunan Obyek Penilaian.          annual gross income of the Object of
                                                            Valuation.

      - Pendekatan Biaya (Cost Approach)                  - Cost Approach

         Pendekatan biaya adalah pendekatan                 The cost approach is a valuation approach
         penilaian untuk mendapatkan nilai Obyek            to obtain an indication of the value of the
         Penilaian berdasarkan biaya reproduksi             Object of Valuation based on the cost of
         baru (reproduction cost new) atau biaya            reproduction new or cost of replacement
         pengganti baru (replacement cost new)              new cut-off date after deducting
         pada tanggal penilaian (cut off date) setelah      depreciation.
         dikurangi dengan penyusutan.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                 ix
Page 11
         Biaya reproduksi baru/biaya pengganti baru         Cost of reproduction new/cost of
         dihitung dengan mempertimbangkan biaya-            replacement new are calculated by
         biaya yang dikeluarkan untuk pengadaan             considering the costs incurred for the
         suatu properti meliputi biaya perencanaan          procurement of a property including
         dan pengawasan, biaya pengadaan unit atau          planning and supervision costs, unit or
         material, biaya pondasi, biaya konstruksi          material procurement costs, foundation
         atau instalasi, termasuk semua pengeluaran         costs, construction or installation costs,
         standar yang berkaitan dengan angkutan,            including all standard expenses related to
         asuransi, bea masuk, pajak, dan biaya              transportation, insurance, import duties,
         bunga selama masa konstruksi, tetapi tidak         taxes, and interest costs during the
         termasuk biaya akibat penundaan waktu              construction period, but excluding costs due
         dan biaya lembur.                                  to time delays and overtime costs.

         Pendekatan biaya digunakan dalam                   Cost approach is used in valuation of the
         penilaian Obyek Penilaian yang berupa              Object of Valuation in the form of
         bangunan dan sarana pelengkap lainnya,             buildings and other land improvement
         dengan mempertimbangkan bahwa biaya                considering         that     cost       of
         reproduksi baru/biaya pengganti baru dan           reproduction/replacement      new      and
         penyusutan dari Obyek Penilaian yang               depreciation of the Object of Valuation in
         berupa bangunan dan sarana pelengkap               the form of buildings and other land
         lainnya dapat diperkirakan.                        improvement can be estimated and at the
                                                            time of site inspection.

      - Pendekatan Pasar (Market Approach)                - Market Approach

         Pendekatan pasar adalah pendekatan                 The market approach is a valuation
         penilaian yang menggunakan data transaksi          approach that uses transaction or offering
         atau penawaran atas properti yang                  data on properties that are comparable and
         sebanding dan sejenis dengan Obyek                 similar to the Object of Valuation which is
         Penilaian yang didasarkan pada suatu               based on a comparison and adjustment
         proses perbandingan dan penyesuaian.               process.

         Pendekatan pasar dilakukan dengan                  The market approach is carried out by
         memperhatikan dan mempertimbangkan                 taking into account and considering data on
         data penjualan dan atau data penawaran             sales and/or data on property offers that are
         properti yang sebanding dan sejenis serta          comparable and similar and have similar
         memiliki kesamaan karakteristik baik               physical characteristics such as location,
         dalam hal fisik seperti lokasi, luas dan           area and shape of land, frontage, nature of
         bentuk tanah, sisi tanah yang berhadapan           ownership/type of certificate, topography,
         dengan         jalan  (frontage),       sifat      condition of land surface, and accessibility,
         kepemilikan/jenis sertifikat, topografi,           and other if any.
         keadaan permukaan tanah, dan mudah atau
         tidaknya dicapai (accessibility), serta lain-
         lain bila ada.

         Pendekatan pasar digunakan dalam                   The market approach is applied in this
         penilaian ini dengan mempertimbangkan              valuation considering that there are
         bahwa pada saat penilaian dilakukan                sufficient amount of listings and offerings
         diperoleh data pembanding properti yang            of comparable assets which in our opinion
         sebanding dan sejenis yang dapat                   are appropriate to be used in the process of
         digunakan dalam proses penilaian Obyek             land valuation.
         Penilaian yang berupa tanah.



Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                x
Page 12
      Pendekatan-pendekatan dan metode-metode                We apply the approaches and methods
      tersebut di atas kami aplikasikan dengan               mentioned above by taking into account the
      memperhatikan karakteristik aset-aset yang             characteristics of the assets that are
      menjadi bagian-bagian dari Obyek Penilaian             components of the Object of Valuation as
      sebagai berikut:                                       follows:

      - Penilaian atas Obyek Penilaian dilakukan          - The valuation of the Object of Valuation is
        dengan       menggunakan       pendekatan           carried out using income approach with
        pendapatan dengan metode GIM dan                    GIM method and cost approach
        pendekatan biaya.
        Dalam penilaian menggunakan metode                   In the valuation used the GIM method, an
        GIM, indikasi nilai pasar Obyek Penilaian            indication of the market value of the Object
        dihasilkan dari konversi pendapatan kotor            of Valuation is generated from the
        tahunan PGI yang mencerminkan dan                    conversion of PGI that reflects and
        mewakili pendapatan tahunan Obyek                    represents future annual income of the
        Penilaian di masa yang akan datang dengan            Object of Valuation with a certain constant
        konstanta tertentu yang biasa disebut                commonly referred as GIM.
        dengan GIM.

         Pendekatan biaya digunakan dalam                    The cost approach is used in the valuation
         penilaian Obyek Penilaian yang berupa               of the Object of Valuation in the form of
         bangunan dan sarana pelengkap lainnya               buildings and other land improvements by
         dengan mempertimbangkan bahwa biaya                 considering that the cost of reproduction
         reproduksi baru/biaya pengganti baru dan            new/cost of replacement new and
         penyusutan dari bangunan dan sarana                 depreciation of buildings and other land
         sarana     pelengkap     lainnya    dapat           improvements can be estimated. Especially
         diperkirakan. Khusus untuk penilaian                for land valuation, the approach used is the
         tanah, pendekatan yang digunakan adalah             market data approach. The market approach
         pendekatan data pasar. Pendekatan pasar             is a valuation approach that uses transaction
         adalah    pendekatan     penilaian   yang           or offering data on comparable and similar
         menggunakan      data     transaksi   atau          properties to the valuation object based on a
         penawaran atas properti yang sebanding              comparison and adjustment process.
         dan sejenis dengan Obyek Penilaian yang
         didasarkan pada suatu proses perbandingan
         dan penyesuaian.

         Mengingat bahwa Obyek Penilaian dinilai             Given that the Object of Valuation is valued
         dengan menggunakan 2 (dua) pendekatan,              using 2 (two) approaches, then the
         selanjutnya indikasi nilai yang diperoleh           indication of the value obtained from each
         dari    tiap-tiap   pendekatan   tersebut           of these approaches is reconciled by
         direkonsiliasi     dengan      melakukan            carrying out a weighting to obtain a
         pembobotan tertimbang untuk memperoleh              conclusion on the value of the Object of
         kesimpulan nilai sebagai kesatuan unit              Valuation as an operational unit.
         operasional.

      Kami telah memeriksa sendiri Obyek                  We have personally inspected the Object of
      Penilaian, menyelidiki kondisi pasar setempat,      Valuation, investigated the local market
      dan memberi perhatian atas:                         condition, and given consideration to the:

      Biaya pengganti baru dari bangunan dan              Cost of replacement new of buildings and
      sarana pelengkap lainnya berdasarkan harga          other land improvements in accordance with
      pasaran setempat pada tanggal penilaian.            the present market price/cost at the date of
                                                          valuation.


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                 xi
Page 13
         Jumlah depresiasi yang meliputi:                   Depreciation was considered for:

         - Penyusutan Fisik                                 - Physical Deterioration

            Aus karena pemakaian, lapuk, kering,               Wear and tear, decay, dryrot, cracks,
            retak-retak, dan kerusakan struktural              encrustation of structural defects;
            dengan memperhatikan umur dan kondisi              consideration given to age and observed
            fisik yang terlihat;                               physical condition;

         - Keusangan Fungsional atau Teknis                 - Functional Obsolescence

            Perencanaan     yang     kurang/tidak              Poor plan, functional inadequacy or over
            memadai,     ketidakmampuan      atau              adequacy due to size, style, age or
            kelebihan kemampuan karena besarnya,               otherwise;
            macam, umur dan sebagainya;

         - Keusangan Ekonomis atau Eksternal                - External Obsolescence

            Disebabkan karena perubahan dari luar              Caused by external changes on the
            terhadap properti, seperti infiltrasi              property     such     as     neighborhood
            lingkungan oleh masyarakat atau                    infiltration of inharmonious people or
            penggunaan    properti  yang    tidak              property uses, legislation and the like.
            harmonis, perundang-undangan, dan
            sebagainya.


      SISTEMATIKA LAPORAN PENILAIAN                       SYSTEMATICS OF VALUATION REPORT

      Laporan penilaian ini terdiri atas:                 This appraisal report contains:

         Surat ini, yang mengidentifikasi Obyek             This letter, which identifies the Object of
         Penilaian   dan   merinci   hasil  dari            Valuation and summarizes the result of our
         pemeriksaan kami;                                  valuation;

         Pernyataan;                                        Certificate of appraisers;

         Asumsi-asumsi dan kondisi pembatas;                Assumptions and limiting conditions;

         Daftar isi;                                        List of contents;

         Resume yang menunjukkan perincian nilai            Resume of valuation, which shows the
         pasar dari Obyek Penilaian;                        market value of the Object of Valuation;

         Laporan penilaian Obyek Penilaian;                 Valuation report of the Object of Valuation;

         Foto-foto dari Obyek Penilaian;                    Photographs of the Object of Valuation; and

         Vicinity Obyek Penilaian; dan                      Vicinity of the Object of Valuation; and

         Layout Obyek Penilaian.                            Layout of the Object of Valuation.




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                xii
Page 14
      KESIMPULAN PENILAIAN                                  VALUATION CONCLUSION

      Berdasarkan hal-hal di atas dan faktor-faktor         Based on the foregoing and other factors
      yang erat hubungannya dengan penilaian, kami          relevant to the valuation, it is our opinion that:
      berkesimpulan bahwa:

                                               Rp 420.381.460.000,00

      ( EMPAT RATUS DUA PULUH MILIAR TIGA RATUS DELAPAN PULUH SATU JUTA
         EMPAT RATUS ENAM PULUH RIBU RUPIAH / FOUR HUNDRED AND TWENTY
         BILLION THREE HUNDRED AND EIGHTY-ONE MILLION FOUR HUNDRED AND
         SIXTY THOUSAND RUPIAH )

      merupakan nilai pasar dari Obyek Penilaian            represents the market value of the Object of
      pada tanggal 31 Desember 2022.                        Valuation as of December 31, 2022.


      Hormat kami/Yours faithfully,

      KJPP SUWENDHO RINALDY DAN REKAN




      Ocky Rinaldy, MAPPI (Cert)
      Rekan/Partner

      Izin Penilai    : PB-1.09.00242
      STTD            : STTD.PPB-05/PM.2/2018
      MAPPI           : 95-S-00654

      OR/wk




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                    xiii
Page 15
               SUWENDHO RINALDY DAN REKAN
               KANTOR JASA PENILAI PUBLIK
                                                                                      Kantor Cabang Jakarta
               Nomor Izin Usaha KJPP: 2.09.0059                           Komplek Kalibata Indah Blok K16-17
               Nomor Izin Cabang KJPP: 1138/KM.1/2017                            Jl. Rawajati Timur, Pancoran
               Penilai Properti dan Bisnis                                              Jakarta Selatan 12750
                                                                                   T (021) 7970913 / 7994521
                                                                                             E ocky@srr.co.id
                                                                             Wilayah Kerja: Seluruh Indonesia
                                                                    Kantor Cabang: Jakarta (P/B), Bandung (P)




               PERNYATAAN PENILAI                         CERTIFICATE OF APPRAISERS


      1. Semua pernyataan dan data yang                   1. All of the statements and data
         tercantum dalam laporan ini adalah benar            contained in this report are true and
         adanya dan sesuai dengan pengetahuan                confirmed     to    the    Valuer(s)’s
         dan itikad baik dari Penilai.                       knowledge and good intention.

      2. Penilai telah melakukan suatu inspeksi           2. The Valuer(s) had conducted an
         atau penelitian fisik secara langsung atas          inspection or physical observation
         Obyek Penilaian.                                    directly to the Object of Valuation.

      3. Penilai sama sekali tidak mempunyai              3. The Valuer(s) has/have no present nor
         kepentingan finansial atau apapun                   future financial or any other interest in
         terhadap Obyek Penilaian untuk sekarang             the Object of Valuation.
         dan masa mendatang.

      4. Nilai dicantumkan dalam mata uang                4. Values are reported in Rupiah and/or
         Rupiah dan/atau ekuivalennya atas                   its equivalent as conforms to the
         permintaan pemberi tugas.                           assignor.

      5. Dalam melakukan penilaian, penilai telah         5. In conducting the valuation, the
         memenuhi lingkup pekerjaan sebagai                  Valuer(s) has/have fulfilled the scope
         berikut:                                            of work as follows:

          • Proses identifikasi (identifikasi batasan,        • Identification               process
            tujuan dan Obyek Penilaian, definisi                (identification    of     limitation,
            penilaian, dan tanggal penilaian);                  purposes and the Object of
                                                                Valuation, definition of valuation,
                                                                and date of valuation);
          • Pengumpulan data dan wawancara;                   • Collection of data and interviews;
          • Analisis data;                                    • Data analysis;
          • Estimasi nilai dengan menggunakan                 • Estimation of value using valuation
            pendekatan penilaian;                               approaches;
          • Pembuatan laporan penilaian.                      • Preparation of report.

      6. Tidak ada penilai lainnya selain yang            6. There are no valuers other than the
         tertera dan bertandatangan di bawah ini,            Valuer(s) listed and signed below that
         yang telah terlibat dalam pelaksanaan               were involved in the inspection,
         inspeksi,   analisis,  dan     pembuatan            analysis, and making conclusion and
         kesimpulan dan opini sebagaimana yang               opinion as stated in this valuation
         dinyatakan dalam laporan penilaian ini.             report.

      7. Penilai telah menyelesaikan persyaratan          7. The Valuer(s) have/has completed the
         pendidikan        profesional     yang              professional education requirements
         dilaksanakan/diselenggarakan       oleh             established/implemented   by     the
         Masyarakat Profesi Penilai Indonesia                Indonesian Society of Appraisers
         (MAPPI).                                            (MAPPI).


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                   xiv
Page 16
      8. Penilai memiliki pengetahuan yang cukup            8. The Valuer(s) have/has sufficient
         dan memadai tentang sifat dan/atau jenis              knowledge of the characteristics
         Obyek Penilaian.                                      and/or types of the Object of
                                                               Valuation.

      9. Analisis, opini, dan kesimpulan yang               9. The analysis, opinion, valuation
         dibuat oleh Penilai, serta laporan penilaian          conclusion, and valuation report had
         telah dibuat dengan memenuhi ketentuan-               been prepared in accordance with
         ketentuan dalam KEPI & SPI.                           KEPI & SPI.

      10. Penugasan penilaian profesional telah             10. Professional valuation of the Object of
          dilakukan terhadap Obyek Penilaian pada               Valuation was conducted at date of
          tanggal penilaian.                                    valuation.




      Rekan Penandatangan/Signing Partner:

            Ocky Rinaldy, MAPPI (Cert)                                   ...............................................
            Public Appraiser No. : PB-1.09.00242
            Reg. M A P P I No.   : 95-S-00654


      Reviewer:

            Hendro Warsito, MAPPI (Cert)                                 ...............................................
            Reg. M A P P I No. : 12-S-03795
            No. Register       : RMK-2017.01701


      Tim Penilai/Valuer Team

            Ahmad Fikri, SE.                                             ...............................................
            Reg. M A P P I No.        : 12-T-03703
            No. Register              : RMK-2017.01700




            Wahyudi Khoirul Ikhsan, S.Tr. T.                             ...............................................
            Reg. M A P P I No.  : 19-P-08954




                                             ********************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                             xv
Page 17
               SUWENDHO RINALDY DAN REKAN
               KANTOR JASA PENILAI PUBLIK
                                                                                          Kantor Cabang Jakarta
               Nomor Izin Usaha KJPP: 2.09.0059                               Komplek Kalibata Indah Blok K16-17
               Nomor Izin Cabang KJPP: 1138/KM.1/2017                                Jl. Rawajati Timur, Pancoran
               Penilai Properti dan Bisnis                                                  Jakarta Selatan 12750
                                                                                       T (021) 7970913 / 7994521
                                                                                                 E ocky@srr.co.id
                                                                                 Wilayah Kerja: Seluruh Indonesia
                                                                        Kantor Cabang: Jakarta (P/B), Bandung (P)




        ASUMSI DAN KONDISI PEMBATAS                           ASSUMPTIONS AND LIMITING
                                                                    CONDITIONS

      1. KJPP Suwendho Rinaldy dan Rekan                  1. KJPP Suwendho Rinaldy dan Rekan
         tidak    memperkenankan        penggunaan           does not allow the use of this report either
         seluruh, ataupun sebagian dari laporan              in part or in whole as a reference in the
         penilaian ini sebagai rujukan dalam bentuk          form of document, circular, statement, and
         dokumen, edaran, pernyataan, referensi              references or publication in any form
         ataupun dipublikasikan dalam bentuk                 without prior written consent from KJPP
         apapun juga tanpa izin tertulis dari KJPP           Suwendho Rinaldy dan Rekan.
         Suwendho Rinaldy dan Rekan.

      2. Informasi yang telah diberikan oleh pihak        2. The information provided by other party to
         lain kepada KJPP Suwendho Rinaldy                   KJPP Suwendho Rinaldy dan Rekan as
         dan Rekan seperti yang telah disebutkan             mentioned in the valuation report is
         dalam laporan penilaian ini dianggap                considered reliable, and KJPP Suwendho
         layak dan dapat dipercaya, tetapi KJPP              Rinaldy dan Rekan could not be held
         Suwendho Rinaldy dan Rekan tidak                    responsible if the said information was
         bertanggung jawab jika ternyata informasi           proven incompatible with actual facts. The
         yang diberikan itu terbukti tidak sesuai            information stated without mentioning the
         dengan hal yang sesungguhnya. Informasi             sources is the result of our analysis of
         yang dinyatakan tanpa menyebutkan                   existing data, examination of documents
         sumbernya merupakan hasil penelaahan                or     information     from   government
         kami terhadap data yang ada, pemeriksaan            authorities. Responsibility to check the
         atas dokumen ataupun keterangan dari                correctness of the information is entirely
         instansi pemerintah yang berwenang.                 on the side of the Assignor.
         Tanggung jawab untuk memeriksa
         kembali kebenaran informasi tersebut
         sepenuhnya berada di pihak Pemberi
         Tugas.

      3. Nilai yang disebutkan dalam laporan ini          3. The value contained in this valuation
         serta setiap nilai lain dalam laporan               report and other values contained in this
         penilaian ini yang merupakan bagian dari            valuation report comprising parts of the
         Obyek Penilaian hanya berlaku sesuai                Object of Valuation are only valid in
         dengan tujuan dan maksud penilaian. Nilai           accordance with the objective and
         yang disebutkan dalam laporan penilaian             purposes written in the valuation report.
         ini tidak boleh digunakan untuk tujuan              The values mentioned in this valuation
         penilaian lain yang dapat mengakibatkan             report cannot be used for other valuation
         terjadinya kesalahan.                               purposes that may result in a mistake.

      4. KJPP Suwendho Rinaldy dan Rekan                  4. Although KJPP Suwendho Rinaldy dan
         telah mempertimbangkan kondisi Obyek                Rekan has already considered the
         Penilaian, namun tidak berkewajiban                 condition of the Object of Valuation
         untuk memeriksa struktur bangunan                   within the explained limited valuation




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                       xvi
Page 18
          ataupun bagian-bagian dari Obyek                    mentioned in this valuation report, but is
          Penilaian yang tertutup, tidak terlihat, dan        not obligated to inspect the structure of the
          tidak dapat dijangkau. KJPP Suwendho                buildings or portions of the Object of
          Rinaldy dan Rekan tidak berkewajiban                Valuation which are covered, invisible,
          untuk melakukan pemeriksaan terhadap                and not accessible. KJPP Suwendho
          fasilitas lingkungan dan lainnya. Kecuali           Rinaldy dan Rekan has no obligation to
          diinformasikan lain, pada penilaian ini             conduct an inspection of environmental
          kami berasumsi bahwa seluruh aspek                  and other facilities. Unless informed
          tersebut dipenuhi dengan baik.                      otherwise, our valuation is based on the
                                                              assumption that all of those aspects are
                                                              well fulfilled.

      5. Kami tidak melakukan penyelidikan atas           5. We do not conduct an investigation into
         kondisi tanah dan fasilitas lingkungan              the conditions of soil and other
         lainnya untuk suatu pengembangan baru.              environmental facilities, for a new
         Apabila tidak diinformasikan lain,                  development. If it has not informed
         penilaian ini didasarkan pada kewajaran,            previously, our valuation is based on
         dan untuk suatu rencana pengembangan                fairness, and to a development plan there
         tidak ada pengeluaran yang tidak wajar              is no unreasonable expenses or delay in
         atau     keterlambatan    dalam    masa             the development.
         pembangunan.

      6. Nilai pasar yang dimaksud mencerminkan           6. The market value contained in this
         nilai    yang      sesungguhnya       tanpa         valuation report represents the real value
         memperhitungkan adanya kewajiban atas               without considering any tax liabilities or
         pajak atau biaya-biaya yang terkait dengan          any expenses which will occur due to the
         transaksi penjualan. Obyek Penilaian yang           sale and/or purchase of the Object of
         dinilai diasumsikan bebas dari segala               Valuation. The Object of Valuation is
         hipotik, persengketaan dan premi serta              assumed free from all mortgages, disputes,
         biaya lain yang belum terselesaikan.                premiums and other costs that have not
                                                             been resolved.

      7. Gambar, denah, ataupun peta yang                 7. The images, plans or maps presented in
         terdapat dalam laporan ini disajikan hanya          this report are for visualization purposes
         untuk kemudahan visualisasi saja. Kami              only. We do not carry out any
         tidak melaksanakan survey/pemetaan dan              survey/mapping and are not responsible
         tidak bertanggung jawab mengenai hal ini.           for this.

      8. Keterangan mengenai rencana tata kota            8. Information regarding the city planning
         diperoleh secara tertulis dan atau secara           plan is obtained in writing and or orally
         lisan yang dikeluarkan oleh instansi yang           issued by the competent authority. Unless
         berwenang. Kecuali diinstruksikan lain,             instructed otherwise, we assume that the
         kami beranggapan bahwa Obyek Penilaian              the Object of Valuation is considered not
         yang dinilai tidak terpengaruh oleh                 to be affected by various restrictions and
         berbagai hal yang bersifat pembatasan-              the the Object of Valuation or current or
         pembatasan dan Obyek Penilaian maupun               future conditions of use are not in conflict
         kondisi penggunaan baik saat ini ataupun            with the applicable regulations.
         yang akan datang tidak bertentangan
         dengan peraturan-peraturan yang berlaku.




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                xvii
Page 19
      9. Obyek Penilaian dilengkapi dengan                9. The Object of Valuation covered with a
         dokumen kepemilikan/penguasaan yang                 ownership/tenure document of legally and
         sah secara hukum dan bebas dari hak atas            free right to the road and any trespass,
         jalan dan pelanggaran apapun juga,                  including also free from handicap
         termasuk pula bebas dari batasan yang               restrictions, barriers or other overhead
         memberatkan, halangan-halangan ataupun              expenses. KJPP Suwendho Rinaldy dan
         pengeluaran tidak wajar lainnya. Untuk              Rekan does not do re-measurements of the
         tujuan pengungkapan luasan Obyek                    Object of Valuation in detail, but data
         Penilaian dalam laporan ini, KJPP                   from certificate and building drawings
         Suwendho Rinaldy dan Rekan tidak                    received from the Company.
         melakukan pengukuran ulang terhadap
         luasan Obyek Penilaian secara detail,
         namun menggunakan data dari sertifikat
         dan gambar bangunan yang diterima dari
         Perseroan.

      10. Biaya untuk penilaian ini tidak tergantung      10. The fee of this valuation is in no manner
          pada besarnya nilai Obyek Penilaian yang            contingent upon the value of the Object of
          diperoleh atau yang tercantum dalam                 Valuation or the value contained in this
          laporan penilaian ini.                              report.

      11. Laporan penilaian ini tidak sah apabila         11. This appraisal report is invalid unless it
          tidak dibubuhi tanda tangan Penilai dari            bears the Valuer(s)’s signature(s) of KJPP
          KJPP Suwendho Rinaldy dan Rekan.                    Suwendho       Rinaldy      dan      Rekan
                                                              Registered Public Valuers.

      12. Penilai tidak berkewajiban memberikan           12. The Valuer(s) conducting valuation of the
          kesaksian atau hadir di pengadilan karena           Object     of    Valuation     is/are   not
          laporan ini, berkaitan dengan terjadinya            automatically obliged to testify and to be
          sengketa atas Obyek Penilaian, tanpa                present in court or other instances related
          perjanjian tertulis terlebih dahulu.                to the Object of Valuation, unless it has
                                                              been arranged in advance.




                                             ********************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                              xviii
Page 20
                                      DAFTAR ISI/TABLE OF CONTENTS

         NO.                                   URAIAN/                            HALAMAN/
                                             DESCRIPTION                              PAGE



            -     Resume Penilaian/Resume of Valuation                                 xvii


            -     Penilaian Supermarket Mitra 10 Cibubur di/
                  Valuation of Mitra10 Cibubur Supermarket at
                  Jl. Alternatif Cibubur Km 14
                  Kelurahan Jatirangga
                  Kecamatan Jatisampurna
                  Kota Bekasi
                  Propinsi Jawa Barat


            A.    Ringkasan Eksekutif/Executive Summary                                A.1

            B.    Uraian Umum/General Description                                      B.1

            C.    Pendekatan Penilaian/Valuation Approach                              C.1

            D.    Uraian Penilaian/Valuation Description                               D.1

            E.    Uraian Obyek Penilaian/Description of the Object of Valuation         E.1




                                             ********************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                 xix
Page 21
                              RESUME PENILAIAN/RESUME OF VALUATION



          No.                      Uraian/                               Nilai Pasar/
                                 Description                            Market Value
                                                                         (Rp .000,00)


            -     Supermarket Mitra 10 Cibubur di/
                  Mitra10 Cibubur Supermarket at
                  Jl. Alternatif Cibubur Km 14
                  Kelurahan Jatirangga
                  Kecamatan Jatisampurna
                  Kota Bekasi
                  Propinsi Jawa Barat


                  1. Tanah/Land                                            330.520.200
                  2. Bangunan/Buildings                                     89.266.865
                  3. Sarana Pelengkap Lainnya/Other Land Improvements          594.395
                                                                          ────────
                  Total 1-3                                                420.381.460
                                                                          ═══════




                                             ********************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                             xx
Page 22
      A. RINGKASAN EKSEKUTIF/EXECUTIVE SUMMARY


          Pemberi Tugas:                                  Assignor:

            PT Catur Sentosa Adiprana Tbk                  PT Catur Sentosa Adiprana Tbk

          Properti yang Dinilai:                          Property Valued:

            Supermarket Mitra 10 Cibubur (tanah            Mitra 10 Cibubur Supermarket (land
            [20.919,00          m²],    bangunan           [22,919.00 m²],               buildings
            [22.070,00 m²], dan sarana pelengkap           [22,070.00 m²],   and     other    land
            lainnya) milik/atas nama BT                    improvements) of/on the name of BT

          Lokasi:                                         Location:

            Jl. Alternatif Cibubur Km 14, Kelurahan        Jl. Alternatif Cibubur Km 14, Kelurahan
            Jatirangga, Kecamatan Jatisampurna,            Jatirangga, Kecamatan Jatisampurna,
            Kota Bekasi, Propinsi Jawa Barat               Kota Bekasi, Propinsi Jawa Barat

          Luas Tanah:                                     Land Area:

            20.919,00 m²                                   20,919.00 m²

          Luas Bangunan:                                  Building Area:

            22.070,00 m²                                   22,070.00 m²

          Bukti Kepemilikan Tanah:                        Ownership Document of Land:

            SHM No. 00322, SHM No. 00335,                  SHM No. 00322, SHM No. 00335,
            SHMNo. 00739, SHM No. 01576,                   SHM No. 00739, SHM No. 01576,
            SHM No. 01607, SHM No. 01661,                  SHM No. 01607, SHM No. 01661,
            SHM No. 01682, dan SHM No. 02364               SHM No. 01682, and SHM No. 02364

          Peruntukan Tata Kota:                           Urban City Planning:

            Zona komersial                                 Commercial area

          Penggunaan Tertinggi dan Terbaik:               Highest and Best Use:

            Penggunaan    sebagai   Supermarket            Usage of the land as a Mitra 10 Cibubur
            Mitra 10 Cibubur diperkirakan akan             Supermarket represent the highest and
            memenuhi prinsip penggunaan tertinggi          best use
            dan terbaik

          Tanggal Inspeksi:                               Date of Inspection:

            7 Februari 2023                                February 7, 2023

          Tanggal Penilaian:                              Date of Valuation:

            31 Desember 2022                               December 31, 2022


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                       A.1
Page 23
          Tujuan Penilaian:                                   Objective of Valuation:

            Untuk memenuhi kebutuhan Perseroan                 To provide needs the Company for the
            dalam rangka kepentingan rencana                   purchase plan of the Object of Valuation.
            pembelian Obyek Penilaian.

          Definisi Nilai:                                     Definition of Value:

            Nilai pasar                                        Market value

          Pendekatan Penilaian:                               Valuation Approach:

            Pendekatan pendaparan dan pendekatan               Income approach and cost approach
            biaya

          Opini Nilai (Nilai Pasar):                          Value Opinion (Market Value):

            Rp 420.381.460.000,00                              Rp 420,381,460,000.00
            (Empat Ratus Dua Puluh Miliar Tiga                 (Four Hundred and Twenty Billion Three
            Ratus Delapan Puluh Satu Juta Empat                Hundred and Eighty-One Million Four
            Ratus Enam Puluh Ribu Rupiah)                      Hundred and Sixty Thousand Rupiah)




                                               *******************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                             A.2
Page 24
      B. URAIAN UMUM/GENERAL DESCRIPTION


          OBYEK PENILAIAN                                 OBJECT OF VALUATION

          Obyek yang dinilai dalam penilaian ini          The object being valued in this valuation is
          adalah Obyek Penilaian, yaitu properti          the Object of Valuation, i.e. property of/on
          milik/atas nama BT yang berupa                  the name of the Company i.e. Mitra 10
          Supermarket Mitra 10 Cibubur (tanah             Cibubur          Supermarket           (land
          [20.919,00 m²], bangunan [22.070,00 m²],        [22,919.00 m²], buildings [22,070.00 m²],
          dan sarana pelengkap lainnya) yang              and other land improvements) located at
          terletak di Jl. Alternatif Cibubur Km 14,       Jl. Alternatif Cibubur Km 14, Kelurahan
          Kelurahan        Jatirangga,    Kecamatan       Jatirangga, Kecamatan Jatisampurna, Kota
          Jatisampurna, Kota Bekasi, Propinsi Jawa        Bekasi, Propinsi Jawa Barat.
          Barat.


          MATA UANG YG DIGUNAKAN                          CURRENCY USED

          Nilai pasar dari Obyek Penilaian per            The market value of the Object of
          tanggal 31 Desember 2022 dinyatakan             Valuation as of the effective date of
          dalam mata uang Rupiah. Sebagai                 valuation, i.e. December 31, 2022, is
          informasi tambahan, kurs tengah BI untuk        stated in Rupiah (Rp) currency. As an
          mata uang Dollar Amerika Serikat                additional information, the middle
          terhadap Rupiah pada tanggal penilaian          exchange rate of BI for US$ to Rp as of
          adalah 1 US$ = Rp 15.731,00.                    December 31, 2022 is Rp 15,731.00 per
                                                          US$.


          MAKSUD DAN TUJUAN PENILAIAN                     PURPOSE AND           OBJECTIVES        OF
                                                          VALUATION

          Tujuan penilaian Obyek Penilaian adalah         The objective of the valuation of the
          untuk memberikan pendapat tentang nilai         Object of Valuation is to obtain an
          pasar dari Obyek Penilaian pada tanggal         independent opinion regarding the market
          31 Desember 2022 yang dinyatakan dalam          value of the Object of Valuation as of the
          mata uang Rupiah.                               effective date of valuation, i.e. December
                                                          31, 2022, stated in Rupiah (Rp) currency.

          Maksud dari penilaian Obyek Penilaian           The purpose of the valuation of the Object
          adalah untuk memenuhi kebutuhan                 of Valuation is to provide needs the
          Perseroan dalam rangka kepentingan              Company for the purchase plan of the
          rencana pembelian Obyek Penilaian.              Object of Valuation.


          ASUMSI-ASUMSI DAN KONDISI                       MAIN ASSUMPTIONS
          PEMBATAS

          Kami tegaskan bahwa dalam penilaian ini         In accordance with KEPI & SPI, in this
          kami tidak memperhitungkan biaya dan            valuation we do not consider the expenses
          pajak yang terjadi karena adanya jual beli,     and taxes which will occur due to the sale
          sesuai dengan yang diatur di dalam              and/or purchase of the Object of
          KEPI & SPI.                                     Valuation.


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                           B.1
Page 25
          Dalam penilaian ini kami berasumsi              In this valuation we assume that:
          bahwa:

          a. Nilai yang tercantum dalam laporan ini       a. The value stated in this report and any
             serta setiap nilai lain dalam laporan ini       other values which constitute parts of
             yang merupakan bagian dari Obyek                the Object of Valuation are only valid
             Penilaian hanya berlaku sesuai dengan           in accordance with the objective and
             tujuan dan maksud penilaian. Nilai yang         purpose of this valuation. The values
             dinyatakan dalam laporan penilaian ini          stated in this report cannot be used for
             tidak dapat digunakan untuk tujuan              other valuation purposes to avoid
             penilaian       lain      yang     dapat        misinterpretation.
             mengakibatkan terjadinya kesalahan.

          b. Obyek Penilaian dilengkapi dengan            b. The Object of Valuation is covered
             dokumen kepemilikan/penguasaan yang             with ownership documents which are
             sah      secara      hukum,      dapat          legally valid, transferable, and free of
             dialihkan/dipindahtangankan, dan bebas          any encumbrances, claims, or any
             dari ikatan, tuntutan atau batasan              limitation other than those stated in this
             apapun selain yang disebutkan dalam             report.
             laporan ini.

          c. Obyek Penilaian merupakan satu               c. The Object of Valuation valued in this
             kesatuan usaha yang dikelola oleh               valuation constitutes a whole business
             manajemen yang kompeten.                        entity   managed       by   competent
                                                             management.

          d. Batasan lainnya, kondisi, komentar, dan      d. Other limitation, conditions, comments,
             detail telah tercantum di dalam laporan         and details are written in this report.
             ini.

          Kami tidak melakukan penyelidikan dan           We did not investigate, and we assume no
          juga bukan merupakan tanggung jawab             responsibility for matters of a legal nature
          kami kemungkinan terjadinya masalah             affecting the Object of Valuation or the
          yang berkaitan dengan status hukum              title thereto.
          kepemilikan, kewajiban utang dan/atau
          sengketa atas Obyek Penilaian.

          Kami tegaskan pula bahwa kami tidak             We have no present or contemplated
          memperoleh manfaat atau keuntungan              future interest in the Object of Valuation
          apapun dari Obyek Penilaian yang kami           and neither the employment to make the
          nilai serta nilai yang kami laporkan, baik      appraisal, nor the compensation for it, is
          pada saat ini maupun di masa yang akan          contingent upon the appraised value of the
          datang.                                         Object of Valuation.


          DASAR NILAI YANG DIGUNAKAN                      BASIS OF VALUE

          Untuk keperluan penilaian atas Obyek            For the purpose of the valuation of the
          Penilaian, standar nilai yang kami              Object of Valuation, value basis which we
          pergunakan dalam laporan penilaian ini          use in this valuation report is the market
          adalah nilai pasar (market value), yang         value. Based on POJK 28/2021, market
          berdasarkan POJK 28/2021 didefinisikan          value is defined as “the estimated amount
          sebagai “estimasi sejumlah uang yang            or paid for exchange an asset or liability
          dapat diperoleh atau dibayar dari hasil         should exchange on the date of valuation

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                            B.2
Page 26
          penukaran suatu aset atau liabilitas pada       between a willing buyer and a willing
          tanggal Penilaian, antara pembeli yang          seller in an arm's-length transaction, after
          berminat membeli dengan penjual yang            proper marketing and where the parties
          berminat menjual, dalam suatu transaksi         had each acted knowledgeably, prudently,
          bebas     ikatan,   yang    pemasarannya        and without compulsion”.
          dilakukan secara layak, dimana kedua
          pihak masing-masing bertindak atas dasar
          pemahaman yang dimilikinya, kehati-
          hatian, dan tanpa paksaan”.


          TANGGAL PENILAIAN                               DATE OF VALUATION

          Tanggal penilaian ditetapkan pada tanggal       The market value of the Object of
          31 Desember 2022. Tanggal ini dipilih           Valuation is estimated as at December 31,
          atas pertimbangan kepentingan dan tujuan        2022. This date was chosen based on the
          penilaian.                                      considerations of the objective and
                                                          purpose of the valuation.


          KEJADIAN PENTING SETELAH                        SIGNIFICANT EVENTS SUBSEQUENT
          TANGGAL PENILAIAN                               TO THE ASSESSMENT DATE

          Dari tanggal penilaian, yaitu tanggal           From the date of valuation, i.e. December
          31 Desember 2022, sampai dengan                 31, 2022, until the date of issuance of this
          tanggal diterbitkannya laporan ini, tidak       valuation report, there are no significant
          terdapat kejadian penting yang dapat            events that may affect the results of the
          mempengaruhi hasil penilaian secara             valuation significantly.
          signifikan.


          DATA DAN INFORMASI YANG                         DATA AND INFORMATION USED
          DIGUNAKAN

          Dalam melakukan penilaian untuk                 In conducting the valuation to estimate the
          memperkirakan nilai pasar dari Obyek            market value of the Object of Valuation,
          Penilaian,    kami     telah   menelaah,        we have reviewed, considered, referred to,
          mempertimbangkan,        mengacu,   atau        or performed procedures on the data and
          melaksanakan prosedur atas data dan             information as follows:
          informasi sebagai berikut:

          1. Salinan SHM,                                 1. Copy of SHM,

          2. Salinan SPPT PBB,                            2. Copy SPPT PBB,

          3. Gambar layout bangunan,                      3. Layout of buildings,

          4. Data hasil inspeksi lapangan, dan            4. Results of physical site inspection,
                                                             and

          5. Dokumen lainnya yang berhubungan             5. Other documents        related   to   the
             dengan penilaian.                               assignment.



Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                            B.3
Page 27
          PENDEKATAN PENILAIAN                             VALUATION APPROACHES

          Pendekatan-pendekatan yang digunakan             Approaches applied in this valuation are
          dalam penilaian ini adalah sebagai berikut:      as follows:

          - Pendekatan Pendapatan                          - Income Approach

             Dalam melakukan penilaian Obyek                 In the valuation of the Object of
             Penilaian yang berupa properti yang             Valuation in the form of property that
             memiliki potensi untuk menghasilkan             has the potential to generate income but
             pendapatan namun relatif sederhana,             is relatively simple, the valuation
             metode penilaian yang digunakan                 method used is the Gross Income
             adalah metode Gross Income Multiplier           Multiplier method.
             (GIM).


             Dalam penilaian menggunakan metode              In the valuation used the GIM method,
             GIM, indikasi nilai pasar Obyek                 an indication of the market value of the
             Penilaian dihasilkan dari konversi              Object of Valuation is generated from
             pendapatan kotor tahunan (potential             the conversion of potential gross annual
             gross income/PGI) yang mencerminkan             income (PGI) that reflects and
             dan mewakili pendapatan tahunan                 represents the future annual income of
             Obyek Penilaian di masa yang akan               the Object of Valuation with a certain
             datang dengan konstanta tertentu yang           constant commonly referred to as GIM.
             biasa disebut dengan GIM.

             Untuk melaksanakan penilaian dengan             For conducting the valuation used the
             metode GIM, kami memperhatikan                  GIM method, we consider sales and
             penjualan dan sewa properti yang                leases of comparable and similar
             sebanding dan sejenis serta memiliki            properties     that      have     similar
             kesamaan karakteristik baik dalam hal           characteristics in terms of physical,
             fisik, lokasi, dan karakteristik investasi,     location, and investment characteristics,
             bila      ada,     pencatatan-pencatatan,       if any, records, interviews with persons
             wawancara-wawancara dengan orang-               or officials and other property owners
             orang atau pejabat-pejabat dan pemilik-         who are familiar with property values
             pemilik      properti    lainnya     yang       and rents in the area and comparable
             mengetahui benar mengenai nilai-nilai           offers. The data is then analyzed to
             properti dan harga sewa di daerah itu           obtain the GIM of the Object of
             serta penawaran yang sebanding. Data            Valuation.
             tersebut kemudian dianalisa untuk
             memperoleh        GIM      dari     Obyek
             Penilaian.

             Untuk mendapatkan indikasi nilai pasar          To obtain an indication of the market
             Obyek Penilaian, GIM yang telah                 value of the Object of Valuation, the
             diperoleh tersebut dikalikan dengan             GIM that has been obtained is
             PGI atau pendapatan kotor tahunan               multiplied by the PGI or annual gross
             Obyek Penilaian.                                income of the Object of Valuation.

          - Pendekatan Biaya (Cost Approach)               - Cost Approach

             Pendekatan biaya adalah pendekatan              The cost approach is a valuation
             penilaian untuk mendapatkan nilai               approach to obtain an indication of the
             Obyek Penilaian berdasarkan biaya               value of the Object of Valuation based

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                           B.4
Page 28
             reproduksi baru (reproduction cost             on the cost of reproduction new or cost
             new) atau biaya pengganti baru                 of replacement new cut-off date after
             (replacement cost new) pada tanggal            deducting depreciation.
             penilaian (cut off date) setelah
             dikurangi dengan penyusutan.

             Biaya reproduksi baru/biaya pengganti          Cost of reproduction new/cost of
             baru         dihitung          dengan          replacement new are calculated by
             mempertimbangkan biaya-biaya yang              considering the costs incurred for the
             dikeluarkan untuk pengadaan suatu              procurement of a property including
             properti meliputi biaya perencanaan            planning and supervision costs, unit or
             dan pengawasan, biaya pengadaan unit           material procurement costs, foundation
             atau material, biaya pondasi, biaya            costs, construction or installation costs,
             konstruksi atau instalasi, termasuk            including all standard expenses related
             semua pengeluaran standar yang                 to transportation, insurance, import
             berkaitan dengan angkutan, asuransi,           duties, taxes, and interest costs during
             bea masuk, pajak, dan biaya bunga              the construction period, but excluding
             selama masa konstruksi, tetapi tidak           costs due to time delays and overtime
             termasuk biaya akibat penundaan waktu          costs.
             dan biaya lembur.

             Pendekatan biaya digunakan dalam               Cost approach is used in valuation of
             penilaian Obyek Penilaian yang berupa          the Object of Valuation in the form of
             bangunan dan sarana pelengkap                  buildings and other land improvement
             lainnya, dengan mempertimbangkan               considering        that      cost    of
             bahwa biaya reproduksi baru/biaya              reproduction/replacement new and
             pengganti baru dan penyusutan dari             depreciation of the Object of Valuation
             Obyek Penilaian yang berupa bangunan           in the form of buildings and other land
             dan sarana pelengkap lainnya dapat             improvement can be estimated and at
             diperkirakan.                                  the time of site inspection.

          - Pendekatan Pasar (Market Approach)            - Market Approach

             Pendekatan pasar adalah pendekatan             The market approach is a valuation
             penilaian yang menggunakan data                approach that uses transaction or
             transaksi atau penawaran atas properti         offering data on properties that are
             yang sebanding dan sejenis dengan              comparable and similar to the Object of
             Obyek Penilaian yang didasarkan pada           Valuation which is based on a
             suatu proses perbandingan dan                  comparison and adjustment process.
             penyesuaian.

             Pendekatan pasar dilakukan dengan              The market approach is carried out by
             memperhatikan                       dan        taking into account and considering
             mempertimbangkan data penjualan dan            data on sales and/or data on property
             atau data penawaran properti yang              offers that are comparable and similar
             sebanding dan sejenis serta memiliki           and      have       similar       physical
             kesamaan karakteristik baik dalam hal          characteristics such as location, area
             fisik seperti lokasi, luas dan bentuk          and shape of land, frontage, nature of
             tanah, sisi tanah yang berhadapan              ownership/type        of       certificate,
             dengan       jalan     (frontage), sifat       topography, condition of land surface,
             kepemilikan/jenis sertifikat, topografi,       and accessibility, and other if any.
             keadaan permukaan tanah, dan mudah
             atau tidaknya dicapai (accessibility),
             serta lain-lain bila ada.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                            B.5
Page 29
             Pendekatan pasar digunakan dalam                    The market approach is applied in this
             penilaian          ini         dengan               valuation considering that there are
             mempertimbangkan bahwa pada saat                    sufficient amount of listings and
             penilaian dilakukan diperoleh data                  offerings of comparable assets which in
             pembanding properti yang sebanding                  our opinion are appropriate to be used
             dan sejenis yang dapat digunakan                    in the process of land valuation.
             dalam proses penilaian Obyek Penilaian
             yang berupa tanah.

      Pendekatan-pendekatan dan metode-metode                We apply the approaches and methods
      tersebut di atas kami aplikasikan dengan               mentioned above by taking into account the
      memperhatikan karakteristik aset-aset yang             characteristics of the assets that are
      menjadi bagian-bagian dari Obyek Penilaian             components of the Object of Valuation as
      sebagai berikut:                                       follows:

      - Penilaian atas Obyek Penilaian dilakukan          - The valuation of the Object of Valuation is
        dengan       menggunakan      pendekatan            carried out using income approach with
        pendapatan dengan metode GIM dan                    GIM method and cost approach
        pendekatan biaya.

         Dalam penilaian menggunakan metode                  In the valuation used the GIM method, an
         GIM, indikasi nilai pasar Obyek Penilaian           indication of the market value of the Object
         dihasilkan dari konversi pendapatan kotor           of Valuation is generated from the
         tahunan PGI yang mencerminkan dan                   conversion of PGI that reflects and
         mewakili pendapatan tahunan Obyek                   represents future annual income of the
         Penilaian di masa yang akan datang dengan           Object of Valuation with a certain constant
         konstanta tertentu yang biasa disebut               commonly referred as GIM.
         dengan GIM.

         Pendekatan biaya digunakan dalam                    The cost approach is used in the valuation
         penilaian Obyek Penilaian yang berupa               of the Object of Valuation in the form of
         bangunan dan sarana pelengkap lainnya               buildings and other land improvements by
         dengan mempertimbangkan bahwa biaya                 considering that the cost of reproduction
         reproduksi baru/biaya pengganti baru dan            new/cost of replacement new and
         penyusutan dari bangunan dan sarana                 depreciation of buildings and other land
         sarana     pelengkap     lainnya    dapat           improvements can be estimated. Especially
         diperkirakan. Khusus untuk penilaian                for land valuation, the approach used is the
         tanah, pendekatan yang digunakan adalah             market data approach. The market approach
         pendekatan data pasar. Pendekatan pasar             is a valuation approach that uses transaction
         adalah    pendekatan     penilaian   yang           or offering data on comparable and similar
         menggunakan      data     transaksi   atau          properties to the valuation object based on a
         penawaran atas properti yang sebanding              comparison and adjustment process.
         dan sejenis dengan obyek penilaian yang
         didasarkan pada suatu proses perbandingan
         dan penyesuaian.

         Mengingat bahwa Obyek Penilaian dinilai             Given that the Object of Valuation is valued
         dengan menggunakan 2 (dua) pendekatan,              using 2 (two) approaches, then the
         selanjutnya indikasi nilai yang diperoleh           indication of the value obtained from each
         dari     tiap-tiap   pendekatan      tersebut       of these approaches is reconciled by
         direkonsiliasi      dengan        melakukan         carrying out a weighting to obtain a
         pembobotan untuk memperoleh kesimpulan              conclusion on the value of the Object of
         nilai sebagai kesatuan unit operasional.            Valuation as an operational unit.


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                               B.6
Page 30
          TINJAUAN EKONOMI INDONESIA                      INDONESIA ECONOMIC REVIEW

          Rapat Dewan Gubernur (RDG) Bank                 The Bank Indonesia Board of Governors'
          Indonesia pada 21-22 Desember 2022              Meeting (RDG) on 21-22 December 2022
          memutuskan untuk menaikkan BI 7-Day             decided to increase the BI 7-Day Reverse
          Reverse Repo Rate (BI7DRR) sebesar 25           Repo Rate (BI7DRR) by 25 bps to 5.50%,
          bps menjadi 5,50%, suku bunga Deposit           the Deposit Facility interest rate by 25 bps
          Facility sebesar 25 bps menjadi 4,75%,          to 4.75%, and Lending Facility interest
          dan suku bunga Lending Facility sebesar         rate by 25 bps to 6.25%. The decision to
          25 bps menjadi 6,25%. Keputusan                 increase interest rates in a more measured
          kenaikan suku bunga yang lebih terukur          manner is a follow-up step for front-
          tersebut sebagai langkah lanjutan untuk         loaded, pre-emptive and forward-looking
          secara front loaded, pre-emptive, dan           measures to ensure the continued decline
          forward looking memastikan terus                in inflation and inflation expectations so
          berlanjutnya penurunan ekspektasi inflasi       that core inflation is maintained within the
          dan inflasi sehingga inflasi inti tetap         range of 3.0 ± 1%. The Rupiah exchange
          terjaga dalam kisaran 3,0±1%. Kebijakan         rate stabilization policy continues to be
          stabilisasi nilai tukar Rupiah terus            strengthened to control imported inflation
          diperkuat untuk mengendalikan inflasi           in addition to mitigating the spillover
          barang impor (imported inflation) di            impact of the still strong US dollar and
          samping untuk memitigasi dampak                 high uncertainty on global financial
          rambatan dari masih kuatnya dolar AS dan        markets.
          masih tingginya ketidakpastian pasar
          keuangan global.

          Menegaskan arah bauran kebijakan Bank           Affirming the direction of Bank
          Indonesia tahun 2023 sebagaimana                Indonesia's policy mix for 2023 as stated
          disampaikan dalam Pertemuan Tahunan             at the 2022 Bank Indonesia Annual
          Bank Indonesia (PTBI) 2022 tanggal 30           Meeting (PTBI) on 30 November 2022,
          November 2022, kebijakan moneter tahun          monetary policy for 2023 will remain
          2023 akan tetap difokuskan untuk menjaga        focused on maintaining stability ("pro-
          stabilitas  (“pro-stability")  sementara        stability") while macroprudential policies,
          kebijakan makroprudensial, digitalisasi         digitalization of the payment system,
          sistem pembayaran, pendalaman pasar             deepening money market, as well as
          uang, serta program ekonomi dan                 inclusive and green economic and
          keuangan inklusif dan hijau terus               financial programs continue to be directed
          diarahkan untuk mendorong pertumbuhan           at encouraging growth (“pro-growth”).
          (“pro-growth").
          Sehubungan dengan itu, Bank Indonesia           In this regard, Bank Indonesia continues to
          terus memperkuat respons bauran                 strengthen its policy mix response to
          kebijakan untuk menjaga stabilitas dan          maintain stability and momentum for
          momentum pemulihan ekonomi sebagai              economic recovery as follows:
          berikut:

         1.    Memperkuat operasi moneter melalui         1. Strengthening monetary operations by
               kenaikan struktur suku bunga di pasar         increasing the interest rate structure on
               uang sesuai dengan kenaikan suku              the money market in accordance with
               bunga BI7DRR tersebut di atas;                the increase in the BI7DRR interest rate
                                                             mentioned above;

         2.    Memperkuat stabilisasi nilai tukar         2. Strengthening the stabilization of the
               Rupiah sebagai bagian dari upaya              Rupiah exchange rate as part of efforts
               pengendalian      inflasi,   terutama         to control inflation, especially imported
               imported inflation, melalui intervensi        inflation, through intervention in the

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                           B.7
Page 31
               di pasar valas dengan transaksi spot,         foreign exchange market with spot
               Domestic Non Deliverable Forward              transactions,      Domestic     Non-
               (DNDF), serta pembelian/penjualan             Deliverable Forwards (DNDF), as well
               Surat Berharga Negara (SBN) di pasar          as      buying/selling    Government
               sekunder;                                     Securities (SBN) in the secondary
                                                             market;

         3.    Melanjutkan        penjualan/pembelian      3. Continuing the sale/purchase of SBN in
               SBN di pasar sekunder untuk                    the secondary market to strengthen the
               memperkuat       transmisi    kenaikan         transmission of the BI7DRR increase in
               BI7DRR dalam meningkatkan daya                 increasing the attractiveness of SBN
               tarik imbal hasil SBN bagi masuknya            yields for foreign portfolio investors in
               investor portofolio asing guna                 order to strengthen the stability of the
               memperkuat stabilisasi nilai tukar             Rupiah exchange rate;
               Rupiah;

         4.    Menerbitkan      instrumen     operasi      4. Issued a new foreign exchange
               moneter (OM) valas yang baru untuk             monetary operation instrument (OM) to
               mendorong penempatan Devisa Hasil              encourage the placement of Export
               Ekspor (DHE), khususnya dari ekspor            Proceeds (DHE), particularly from
               Sumber Daya Alam (SDA), di dalam               Natural Resource (SDA) exports,
               negeri oleh bank dan eksportir untuk           domestically by banks and exporters to
               memperkuat stabilisasi, termasuk               strengthen stabilization, including the
               stabilitas nilai tukar Rupiah dan              stability of the Rupiah exchange rate
               pemulihan       ekonomi      nasional.         and recovery national economy. The
               Instrumen OM Valas tersebut                    OM Forex instrument is carried out
               dilakukan dengan imbal hasil yang              with competitive yields based on a
               kompetitif berdasarkan mekanisme               transparent      market      mechanism
               pasar yang transparan disertai dengan          accompanied by the provision of
               pemberian insentif kepada bank;                incentives to banks;

         5.    Memperkuat                  kebijakan       5. Strengthen accommodative, inclusive
               makroprudensial yang akomodatif,               and      sustainable     macroprudential
               inklusif, dan berkelanjutan untuk              policies      to     encourage      bank
               mendorong               pertumbuhan            credit/financing growth, especially for
               kredit/pembiayaan         perbankan,           priority sectors that have not yet
               khususnya     kepada    sektor-sektor          recovered, People's Business Credit
               prioritas yang belum pulih, Kredit             (KUR), and green credit/financing, in
               Usaha      Rakyat    (KUR),       dan          order to support economic recovery
               kredit/pembiayaan    hijau,    dalam           through improvements GWM incentive
               rangka     mendukung       pemulihan           provisions, effective from 1 April 2023,
               perekonomian                  melalui          include: (Attachment 1)
               penyempurnaan ketentuan insentif
               GWM, berlaku sejak 1 April 2023,
               mencakup: (Lampiran 1)

               a.   Reklasifikasi      46     subsektor      a. Reclassification of 46 priority sub-
                    prioritas 3 (tiga) kelompok sektor          sectors into 3 (three) business sector
                    usaha yaitu kelompok yang                   groups, namely the Resilience group,
                    berdaya      tahan     (Resilience),        the Growth Driver group, and the
                    kelompok                 penggerak          Slow Starter group, according to
                    pertumbuhan (Growth Driver),                current conditions by maintaining
                    dan       kelompok        penopang          the credit/financing growth threshold
                    pemulihan (Slow Starter), sesuai            that receives incentives for the Slow

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                            B.8
Page 32
                     kondisi      terkini     dengan            Starter it remains at least 1%, as well
                     mempertahankan         threshold           as increasing the threshold for the
                     pertumbuhan kredit/pembiayaan              Resilience and Growth Driver
                     yang mendapatkan insentif untuk            groups from a minimum of 1% to a
                     Slow Starter tetap minimal 1%,             minimum       of     5%      and    3%
                     serta meningkatkan threshold               respectively.
                     untuk kelompok Resilience dan
                     Growth Driver dari semula
                     minimal 1% menjadi masing-
                     masing minimal 5% dan 3%.

               b. Peningkatan dua kali lipat besaran         b. A doubling of the GWM incentive
                  insentif GWM kepada bank                      for KUR channeling banks and
                  penyalur KUR dan kredit UMKM                  MSME loans to a maximum of 1% is
                  menjadi paling besar 1% disertai              accompanied by the addition of bank
                  dengan penambahan kelompok                    groups based on achieving the
                  bank berdasarkan pencapaian                   Macroprudential Inclusive Financing
                  Rasio    Pembiayaan        Inklusif           Ratio (RPIM), namely above 30% -
                  Makroprudensial (RPIM), yaitu di              50%, and above 50%.
                  atas 30% - 50%, dan di atas 50%.

               c.    Pemberian      insentif    terhadap     c. Providing incentives for green
                     penyaluran       kredit/pembiayaan         credit/financing, namely property
                     hijau yaitu kredit/pembiayaan              and/or environmentally sound motor
                     properti    dan/atau     kendaraan         vehicle loans/financing, with a
                     bermotor berwawasan lingkungan             maximum of 0.3%.
                     paling besar 0,3%.

               d. Peningkatan besaran total insentif         d. dhe increase in the total amount of
                  GWM yang dapat diterima bank                  GWM incentives that can be
                  dari sebelumnya paling besar                  received by banks from previously a
                  200bps menjadi paling besar                   maximum of 200 bps to a maximum
                  280bps.                                       of 280 bps.

         6.    Melanjutkan kebijakan transparansi          6. Continuing the policy of transparency
               suku bunga dasar kredit (SBDK)                 of prime lending rates (SBDK) with a
               dengan fokus pada respons suku                 focus on the response of banking
               bunga perbankan terhadap suku bunga            interest rates to policy rates (Appendix
               kebijakan (Lampiran 2);                        2);

         7.    Memperkuat      kebijakan   sistem          7. Strengthen payment system policies to
               pembayaran untuk meningkatkan                  increase efficiency in order to maintain
               efisiensi dalam rangka menjaga                 the momentum of economic recovery
               momentum      pemulihan   ekonomi              by:
               dengan:
                                                             a. Continuing credit card policy by:
               a.     Melanjutkan kebijakan kartu               i. Maintaining a maximum credit
                      kredit dengan:                               card interest rate limit of 1.75%
                     i. Mempertahankan          batas              per month.
                        maksimum suku bunga kartu
                        kredit 1,75% per bulan.                 ii. Extending the validity period of
                    ii. Memperpanjang masa berlaku                  the minimum payment limit
                        kebijakan batas minimum                     policy by credit card holders of
                        pembayaran oleh pemegang                    5% of the total bill from

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                            B.9
Page 33
                      kartu kredit 5% dari total                  December 31, 2022 to June 30,
                      tagihan       dari       semula             2023.
                      31 Desember 2022 menjadi
                      30 Juni 2023.                          iii. Extending the validity period of
                 iii. Memperpanjang masa berlaku                  the policy for late payment of
                      kebijakan       nilai     denda             credit card payments by 1% or a
                      keterlambatan        pembayaran             maximum of IDR 100,000.00
                      kartu kredit sebesar 1% atau                from December 31, 2022 to June
                      maksimal Rp100.000,00 dari                  30, 2023.
                      semula 31 Desember 2022
                      menjadi 30 Juni 2023.                 b. Extending the validity period of the
               b. Memperpanjang masa berlaku                   QRIS Merchant Discount Rate
                    Merchant Discount Rate (MDR)               (MDR) for merchants in the Micro
                    QRIS untuk merchant kategori               Business (UMI) category by 0%
                    Usaha Mikro (UMI) sebesar 0%               from December 31, 2022 to June 30,
                    dari semula 31 Desember 2022               2023.
                    menjadi 30 Juni 2023.                   c. Continuing the validity period of the
               c. Melanjutkan        masa     berlaku          SKNBI tariff policy of IDR 1 from
                    kebijakan tarif SKNBI sebesar              Bank Indonesia to banks and a
                    Rp1 dari Bank Indonesia ke bank            maximum of IDR 2,900 from banks
                    dan maksimum Rp2.900 dari bank             to customers from December 31,
                    kepada nasabah dari semula                 2022 to June 30, 2023.
                    31 Desember      2022     menjadi
                    30 Juni 2023.

         8.    Menempuh langkah strategis untuk           8. Take strategic steps to ensure the
               memastikan     kelancaran    sistem           smooth running of the national
               pembayaran nasional mengantisipasi            payment system in anticipation of
               Natal dan Tahun Baru dengan:                  Christmas and New Year by:

               a. Memastikan ketersediaan uang               a. Ensuring the availability of quality
                  Rupiah dengan kualitas yang                   Rupiah currency throughout the
                  terjaga di seluruh wilayah Negara             territory of the Unitary State of the
                  Kesatuan     Republik    Indonesia            Republic of Indonesia (NKRI).
                  (NKRI).                                    b. Maintaining       the    operational
               b. Menjaga           keberlangsungan             continuity of the payment system
                  operasional sistem pembayaran                 organized by Bank Indonesia and
                  yang diselenggarakan oleh Bank                the payment system industry.
                  Indonesia dan industri sistem
                  pembayaran.

         9.    Memperkuat kerja sama internasional        9. Strengthening              international
               dengan bank sentral dan otoritas              cooperation with central banks and
               negara mitra lainnya, serta fasilitasi        other partner country authorities, as
               penyelenggaraan promosi investasi             well as facilitating the implementation
               dan perdagangan di sektor prioritas           of investment and trade promotions in
               bekerja sama dengan instansi terkait.         priority sectors in collaboration with
               Selain    itu,   Bank      Indonesia          relevant agencies. In addition, Bank
               berkoordinasi                dengan           Indonesia is coordinating with relevant
               Kementerian/Lembaga terkait untuk             Ministries/Institutions to make the
               menyukseskan Keketuaan ASEAN                  2023 ASEAN Chair successful,
               2023 khususnya melalui jalur                  especially through the financial
               keuangan.                                     channel.


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                         B.10
Page 34
          Koordinasi kebijakan dengan Pemerintah          Policy coordination with the Central
          Pusat, Pemerintah Daerah, dan mitra             Government, Regional Governments, and
          strategis juga terus diperkuat. Dalam           strategic partners is also continuously
          kaitan ini, koordinasi dalam Tim                being strengthened. In this regard,
          Pengendalian Inflasi Pusat dan Daerah           coordination within the Central and
          (TPIP dan TPID) terus dilanjutkan melalui       Regional Inflation Control Teams (TPIP
          penguatan program Gerakan Nasional              and TPID) continues through the
          Pengendalian Inflasi Pangan (GNPIP) di          strengthening of the National Food
          berbagai daerah. Sinergi kebijakan antara       Inflation Control Movement (GNPIP)
          Bank Indonesia dengan kebijakan sektor          program in various regions. Policy
          Pemerintah dan dengan Komite Stabilitas         synergy between Bank Indonesia and
          Sistem Keuangan (KSSK) terus diperkuat          Government sector policies and with the
          dalam     rangka    menjaga      stabilitas     Financial System Stability Committee
          makroekonomi dan sektor keuangan,               (KSSK) continues to be strengthened in
          mendorong kredit/pembiayaan kepada              order to maintain macroeconomic and
          dunia usaha pada sektor-sektor prioritas        financial sector stability, encourage
          untuk mendukung pertumbuhan ekonomi             credit/financing to the business world in
          dan ekspor, serta meningkatkan ekonomi          priority sectors to support economic
          dan keuangan inklusif dan hijau.                growth and exports, and increase inclusive
                                                          and green economy and finance.

          Perekonomian global menurun disertai            The global economy is declining
          dengan ketidakpastian yang masih tinggi.        accompanied by high uncertainty. Global
          Pertumbuhan ekonomi global 2023 masih           economic growth in 2023 will still slow
          melambat sebagaimana prakiraan, dengan          down as predicted, with a high risk of
          risiko resesi yang tinggi di beberapa           recession in several countries, including
          negara, termasuk Amerika Serikat (AS)           the United States (US) and Europe. The
          dan Eropa. Perlambatan ekonomi global           global economic slowdown was affected
          tersebut dipengaruhi oleh fragmentasi           by economic fragmentation, trade and
          ekonomi, perdagangan dan investasi              investment due to continuing political
          akibat ketegangan politik yang berlanjut        tensions and the impact of aggressive
          serta dampak pengetatan kebijakan               monetary policy tightening in developed
          moneter yang agresif di negara maju.            countries. Bank Indonesia predicts that the
          Bank Indonesia memprakirakan ekonomi            world economy will grow by 3.0% in 2022
          dunia tumbuh sebesar 3,0% pada 2022 dan         and decrease to 2.6% in 2023. Meanwhile,
          menurun menjadi 2,6% pada 2023.                 inflationary pressure is still high, although
          Sementara itu, tekanan inflasi masih            it has begun to ease, due to continuing
          tinggi, meskipun mulai melandai,                supply chain disruptions and a tight labor
          dipengaruhi berlanjutnya gangguan rantai        market, especially in the US and Europe .
          pasokan dan ketatnya pasar tenaga kerja         High inflation has pushed global monetary
          terutama di AS dan Eropa. Inflasi yang          policy to remain tight. The Fed is
          masih tinggi mendorong kebijakan                predicted to raise the Fed Funds Rate until
          moneter global tetap ketat. The Fed             early 2023 with a long cycle of monetary
          diprakirakan akan menaikkan Fed Funds           policy tightening, although at a lower rate.
          Rate hingga awal 2023 dengan siklus             These developments have contributed to
          pengetatan kebijakan moneter yang               the continued strength of the US dollar and
          panjang, meskipun dengan besaran yang           the ongoing high uncertainty in global
          lebih    rendah.    Perkembangan     ini        financial markets, which has resulted in
          mendorong tetap kuatnya mata uang dolar         weak capital inflows to developing
          AS dan masih tingginya ketidakpastian           countries, including Indonesia.
          pasar keuangan global yang kemudian
          berdampak pada belum kuatnya aliran
          modal masuk ke negara berkembang,
          termasuk Indonesia.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          B.11
Page 35
          Pertumbuhan ekonomi domestik Indonesia          Indonesia's domestic economic growth
          tetap baik. Permintaan domestik tetap           remains good. Domestic demand remains
          berdaya tahan dipengaruhi oleh daya beli        resilient,    influenced     by     people's
          masyarakat dan keyakinan pelaku                 purchasing power and the confidence of
          ekonomi        yang       tetap     terjaga.    economic actors that is maintained. These
          Perkembangan ini tercermin pada berbagai        developments are reflected in various
          indikator bulan November 2022 dan hasil         indicators for November 2022 and the
          survei Bank Indonesia terakhir, seperti         latest Bank Indonesia survey results, such
          keyakinan konsumen, penjualan eceran,           as consumer confidence, retail sales, and
          dan Purchasing Managers' Index (PMI)            Manufacturing Purchasing Managers'
          Manufaktur. Sementara itu, kinerja ekspor       Index      (PMI).     Meanwhile,     export
          diprakirakan tetap kuat, khususnya              performance is predicted to remain strong,
          didorong ekspor batu bara, CPO, besi dan        especially driven by exports of coal, CPO,
          baja, serta ekspor jasa, seiring permintaan     iron and steel, as well as exports of
          beberapa mitra dagang utama yang masih          services, in line with the strong demand
          kuat serta dampak positif kebijakan yang        from several main trading partners and the
          ditempuh Pemerintah. Secara spasial,            positive impact of the policies adopted by
          kinerja positif ekspor ditopang terutama        the Government. Spatially, the positive
          didorong Kalimantan, Sumatera, dan              performance of exports was mainly driven
          Sulawesi-Maluku-Papua (Sulampua), yang          by Kalimantan, Sumatra and Sulawesi-
          tetap tumbuh kuat. Pertumbuhan ekonomi          Maluku-Papua         (Sulampua),      which
          yang tetap baik sejalan dengan                  continued to grow strongly. Economic
          perkembangan dari sisi lapangan usaha           growth that remained good was in line
          dimana sektor Perdagangan Besar dan             with developments in terms of business
          Eceran, Industri Pengolahan, serta              fields where the Wholesale and Retail
          Transportasi dan Pergudangan tumbuh             Trade,      Processing     Industry,    and
          cukup kuat. Dengan perkembangan                 Transportation and Warehousing sectors
          tersebut, pertumbuhan ekonomi 2022              grew quite strongly. With these
          diprakirakan tetap bias ke atas dalam           developments, economic growth in 2022 is
          kisaran proyeksi Bank Indonesia pada 4,5-       predicted to remain biased upwards within
          5,3%. Pada tahun 2023, pertumbuhan              the range of Bank Indonesia's projection of
          ekonomi diprakirakan tetap kuat meskipun        4.5-5.3%. In 2023, economic growth is
          sedikit    melambat       sejalan   dengan      predicted to remain strong although it will
          perlambatan ekonomi global ke titik             slow slightly in line with the global
          tengah kisaran 4,5-5,3%.                        economic slowdown to the midpoint of the
                                                          4.5-5.3% range.

          Neraca Pembayaran Indonesia (NPI) tetap         Indonesia's balance of payments (BOP)
          kuat sehingga mendukung ketahanan               remains strong thereby supporting external
          eksternal. Transaksi berjalan triwulan IV       resilience. The current account for the
          2022 diprakirakan kembali mencatatkan           fourth quarter of 2022 is predicted to
          surplus sejalan dengan kinerja neraca           record a surplus again in line with the
          perdagangan yang tetap baik. Neraca             performance of the trade balance which
          perdagangan November 2022 mencatat              remains good. The November 2022 trade
          surplus sebesar 5,2 miliar dolar AS,            balance recorded a surplus of USD 5.2
          didukung oleh kinerja ekspor komoditas          billion, supported by the performance of
          utama. Aliran masuk modal asing di              main commodity exports. Inflows of
          investasi portofolio secara perlahan mulai      foreign capital in portfolio investment
          terjadi pada November-Desember 2022,            slowly began to occur in November-
          meskipun secara triwulanan hingga 20            December 2022, although on a quarterly
          Desember 2022 masih tercatat net                basis until December 20 2022 there were
          outflows sebesar 0,4 miliar dolar AS.           still recorded net outflows of USD 0.4
          Posisi cadangan devisa Indonesia akhir          billion. The position of Indonesia's foreign
          November 2022 meningkat dibandingkan            exchange reserves at the end of November

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          B.12
Page 36
          dengan posisi bulan sebelumnya, dan             2022 increased compared to the previous
          tercatat sebesar 134,0 miliar dolar AS,         month's position, and was recorded at
          setara dengan pembiayaan 5,9 bulan impor        US$134.0 billion, equivalent to 5.9
          atau 5,8 bulan impor dan pembayaran             months of import financing or 5.8 months
          utang luar negeri Pemerintah, serta berada      of imports and servicing the Government's
          di atas standar kecukupan internasional         foreign debt, and is above the standard
          sekitar 3 bulan impor. Secara keseluruhan       international sufficiency around 3 months
          2022, kinerja NPI diprakirakan tetap            of import. Overall, 2022 is predicted to
          terjaga didukung surplus transaksi berjalan     maintain balance of payments supported
          berada dalam kisaran 0,4 - 1,2% dari PDB        by the current account surplus in the range
          sejalan permintaan eksternal dan harga          of 0.4 - 1.2% of GDP in line with external
          komoditas global yang masih tinggi, dan         demand and global commodity prices
          kinerja neraca transaksi modal dan              which are still high, and the performance
          finansial yang tetap baik terutama dalam        of the capital and financial account
          bentuk     PMA.     Di     tengah    risiko     balance which remains good, especially in
          ketidakpastian pasar keuangan global yang       the form of FDI. Amidst the high risks of
          masih tinggi, kinerja NPI pada 2023 juga        uncertainty on global financial markets,
          diprakirakan tetap baik ditopang oleh           the balance of payments is also predicted
          surplus neraca transaksi modal dan              to perform well in 2023, supported by a
          finansial serta transaksi berjalan yang         surplus in the capital and financial account
          solid dalam kisaran surplus 0,4% sampai         balances and a solid current account
          dengan defisit 0,4% dari PDB.                   within the range of a surplus of 0.4% to a
                                                          deficit of 0.4% of GDP.

          Dengan langkah-langkah stabilisasi Bank         With Bank Indonesia's stabilization
          Indonesia, stabilitas nilai tukar Rupiah        measures, the stability of the Rupiah
          terjaga di tengah masih tingginya               exchange rate was maintained amidst the
          ketidakpastian pasar keuangan global.           high uncertainty in global financial
          Tekanan nilai tukar Rupiah pada                 markets. The pressure on the Rupiah
          November-Desember 2022 berkurang                exchange rate in November-December
          dipengaruhi aliran masuk modal asing            2022 will ease due to the inflow of foreign
          yang terjadi di pasar SBN serta langkah-        capital that has occurred in the SBN
          langkah stabilisasi yang dilakukan oleh         market as well as the stabilization
          Bank Indonesia. Perkembangan nilai tukar        measures taken by Bank Indonesia. The
          Rupiah tersebut cukup positif di tengah         development of the Rupiah exchange rate
          dolar AS yang masih kuat dan                    was quite positive amidst the still strong
          ketidakpastian pasar keuangan global yang       US dollar and high uncertainty on global
          masih tinggi. Indeks nilai tukar dolar AS       financial markets. The US Dollar
          terhadap mata uang utama (DXY) tercatat         exchange rate index against major
          masih tinggi di level 104,16 pada 21            currencies (DXY) remained high at 104.16
          Desember 2022. Dengan perkembangan              on December 21, 2022. With these
          tersebut, nilai tukar Rupiah sampai dengan      developments, the Rupiah exchange rate
          21 Desember 2022, terdepresiasi 8,56%           up to December 21, 2022, depreciated by
          (ytd) dibandingkan dengan level akhir           8.56% (ytd) compared to the final level
          2021. Depresiasi nilai tukar Rupiah             2021. The depreciation of the Rupiah
          tersebut relatif lebih baik dibandingkan        exchange rate is relatively better compared
          dengan depresiasi mata uang sejumlah            to the depreciation of the currencies of a
          negara lain di kawasan, seperti Tiongkok        number of other countries in the region,
          8,96% (ytd) dan India 10,24% (ytd). Ke          such as China's 8.96% (ytd) and India's
          depan, Bank Indonesia terus memperkuat          10.24% (ytd). Going forward, Bank
          kebijakan stabilisasi nilai tukar Rupiah        Indonesia will continue to strengthen the
          agar sejalan nilai fundamentalnya untuk         Rupiah exchange rate stabilization policy
          mendukung upaya pengendalian inflasi            so that it is in line with its fundamental
          dan stabilitas makroekonomi.                    value to support efforts to control inflation

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          B.13
Page 37
                                                          and macroeconomic stability.

          Ekspektasi inflasi dan inflasi secara           Inflation expectations and monthly
          bulanan terus menurun dan lebih rendah          inflation continued to decline and were
          dari prakiraan awal, meskipun masih             lower than earlier forecasts, although they
          tinggi. Inflasi IHK November 2022               were still high. November 2022 CPI
          tercatat lebih rendah dari prakiraan dan        inflation was recorded lower than forecast
          inflasi bulan sebelumnya, meski masih           and inflation in the previous month,
          tinggi sebesar 5,42% (yoy) dan di atas          although it was still high at 5.42% (yoy)
          sasaran 3,0±1%. Inflasi kelompok volatile       and above the target of 3.0 ± 1%. Inflation
          food juga turun menjadi 5,70% (yoy) baik        in the volatile foods category also fell to
          secara nasional maupun di sebagian besar        5.70% (yoy) both nationally and in most
          wilayah Indonesia, didukung sinergi dan         parts of Indonesia, supported by close
          koordinasi kebijakan yang erat antara           policy synergy and coordination between
          Pemerintah (Pusat dan Daerah), Bank             the Government (Central and Regional),
          Indonesia, dan para mitra strategis melalui     Bank Indonesia, and strategic partners
          TPIP-TPID        dan    GNPIP.       Inflasi    through TPIPs and GNPIP. Administered
          administered prices juga tercatat turun         prices inflation also fell to 13.01% (yoy)
          menjadi sebesar 13,01% (yoy) sejalan            in line with lower air transport fares and
          dengan menurunnya tarif angkutan udara          non-subsidized fuel prices. Meanwhile,
          dan harga Bahan Bakar Minyak (BBM)              core inflation declined again to 3.30%
          nonsubsidi. Sementara itu, inflasi inti         (yoy), influenced by the continued impact
          kembali menurun menjadi 3,30% (yoy),            of fuel price adjustments on limited core
          dipengaruhi oleh dampak lanjutan                inflation and subdued inflationary pressure
          penyesuaian harga BBM terhadap inflasi          from the demand side. Going forward,
          inti yang terbatas dan tekanan inflasi dari     Bank Indonesia will continue to strengthen
          sisi permintaan yang belum kuat. Ke             its policy response to ensure the continued
          depan, Bank Indonesia akan terus                decline in inflation expectations and
          memperkuat respons kebijakan guna               inflation so that core inflation is
          memastikan terus berlanjutnya penurunan         maintained within the range of 3.0 ± 1%.
          ekspektasi inflasi dan inflasi sehingga
          inflasi inti tetap terjaga dalam kisaran
          3,0±1%.

          Likuiditas perbankan dan perekonomian           The liquidity of the banking system and
          masih memadai untuk mendorong                   the economy is still sufficient to encourage
          peningkatan      kredit/pembiayan     dan       increased credit/financing and further
          pemulihan ekonomi lebih lanjut. Pada            economic recovery. In November 2022,
          November 2022, rasio Alat Likuid                the ratio of Liquid Assets to Third Party
          terhadap Dana Pihak Ketiga (AL/DPK)             Funds (AL/DPK) remained high, reaching
          tetap tinggi, mencapai 30,42%, sehingga         30.42%, thus supporting the availability of
          mendukung ketersediaan dana bagi                funds for banks to channel credit/financing
          perbankan          untuk       penyaluran       for the business world. This is in line with
          kredit/pembiayaan bagi dunia usaha. Hal         the accommodative liquidity policy stance
          ini sejalan dengan stance kebijakan             by Bank Indonesia. Economic liquidity
          likuiditas yang akomodatif oleh Bank            also remained in line with economic
          Indonesia. Likuiditas perekonomian juga         activity, reflected in the narrow (M1) and
          tetap sejalan dengan kegiatan ekonomi,          broad (M2) money supply which grew by
          tercermin pada uang beredar dalam arti          11.7% (yoy) and 9.5% (yoy), respectively.
          sempit (M1) dan luas (M2) yang tumbuh           Meanwhile,        in     line    with    the
          masing-masing sebesar 11,7% (yoy) dan           implementation of the Joint Agreement
          9,5% (yoy). Sementara itu, sejalan              (KB) between Bank Indonesia and the
          pelaksanaan Kesepakatan Bersama (KB)            Ministry of Finance, Bank Indonesia will
          Bank      Indonesia    dan   Kementerian        continue to purchase SBN on the primary

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          B.14
Page 38
          Keuangan, Bank Indonesia melanjutkan            market in the framework of the national
          pembelian SBN di pasar perdana dalam            economic recovery program as well as
          rangka program pemulihan ekonomi                financing health and humanitarian
          nasional serta pembiayaan penanganan            assistance to deal with the impact of the
          kesehatan    dan    kemanusiaan      guna       Covid-19 pandemic. In 2022 as a whole,
          penanganan dampak pandemi Covid-19.             until 21 December 2022, Bank Indonesia
          Secara keseluruhan tahun 2022, hingga 21        has purchased IDR 144.53 trillion of SBN,
          Desember 2022, Bank Indonesia telah             consisting of IDR 49.11 trillion for KB I
          melakukan pembelian SBN sebesar                 and IDR 95.42 trillion for KB III. In
          Rp144,53 triliun yang terdiri dari              accordance with KB III, Bank Indonesia
          pelaksaan KB I sebesar Rp49,11 triliun          will still purchase SB
          dan KB III sebesar Rp95,42 triliun. Sesuai
          KB III, Bank Indonesia juga masih akan
          melakukan pembelian SBN di pasar
          perdana sebesar Rp128,58 triliun untuk
          pendanaan anggaran kesehatan dan
          kemanusiaan dalam APBN 2022.

          Suku bunga perbankan juga masih                 Banking interest rates are also still
          kondusif mendukung pemulihan ekonomi.           conducive to supporting economic
          Di pasar uang, suku bunga IndONIA pada          recovery. On the money market,
          21 Desember 2022 naik 200 bps                   IndONIA's interest rate on 21 December
          dibandingkan akhir Juli 2022 menjadi            2022 rose 200 bps compared to the end of
          sebesar 4,80%, sejalan dengan kenaikan          July 2022 to 4.80%, in line with the
          BI7DRR dan penguatan strategi operasi           increase in the BI7DRR and the
          moneter Bank Indonesia. Imbal hasil SBN         strengthening of Bank Indonesia's
          tenor jangka pendek meningkat 59 bps,           monetary operations strategy. Yields on
          sementara imbal hasil SBN tenor jangka          short-term SBN increased by 59 bps, while
          panjang tetap terkendali. Sementara itu,        yields on long-term SBN remained under
          kenaikan suku bunga perbankan, baik             control. Meanwhile, increases in bank
          suku bunga dana maupun suku bunga               interest rates, both deposit rates and
          kredit, lebih terbatas. Suku bunga deposito     lending rates, were more limited. The 1-
          1 bulan pada November 2022 tercatat             month deposit interest rate in November
          3,72%      atau     meningkat    83    bps      2022 was recorded at 3.72%, an increase
          dibandingkan dengan level Juli 2022,            of 83 bps compared to the July 2022 level,
          sementara suku bunga kredit November            while the November 2022 lending rate was
          2022 tercatat 9,11% atau meningkat 17           recorded at 9.11% or an increase of 17 bps
          bps dibandingkan dengan level Juli 2022.        compared to the July 2022 level. The
          Kenaikan suku bunga perbankan yang              increase in bank interest rates was limited
          terbatas tersebut dipengaruhi likuiditas        This is influenced by liquidity that is still
          yang masih longgar. Ke depan, Bank              loose. Going forward, Bank Indonesia will
          Indonesia      akan      terus  mendorong       continue to encourage banks to establish
          perbankan untuk membentuk suku bunga            efficient, accommodative and competitive
          kredit yang efisien, akomodatif, dan            lending rates that can support economic
          kompetitif yang dapat mendukung                 recovery.
          pemulihan ekonomi.

          Intermediasi perbankan terus membaik            Banking intermediation continues to
          didorong peningkatan dari sisi permintaan       improve driven by increases in demand
          dan penawaran. Pertumbuhan kredit pada          and supply. Credit growth in November
          November 2022 tercatat sebesar 11,16%           2022 was recorded at 11.16% (yoy),
          (yoy), ditopang oleh pertumbuhan positif        supported by positive growth in all types
          di seluruh jenis kredit dan mayoritas           of credit and the majority of economic
          sektor ekonomi. Pemulihan intermediasi          sectors. Intermediation recovery also

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          B.15
Page 39
          juga terjadi pada perbankan syariah,            occurred in sharia banking, with financing
          dengan pertumbuhan pembiayaan sebesar           growth of 23.5% (yoy). In the MSME
          23,5% (yoy). Di segmen UMKM,                    segment, MSME credit growth in
          pertumbuhan kredit UMKM pada                    November 2022 was recorded to be quite
          November 2022 tercatat cukup tinggi             high at 18.13% (yoy). On the supply side,
          sebesar 18,13% (yoy). Di sisi penawaran,        improvement in banking intermediation
          perbaikan     intermediasi      perbankan       was supported by adequate banking
          didukung likuiditas perbankan yang              liquidity and loose credit/payment
          memadai     dan     standar    penyaluran       standards. Meanwhile, from the demand
          kredit/pembayaan yang tetap longgar.            side, the increase in credit/financing was
          Sementara dari sisi permintaan, kenaikan        supported by steady corporate demand and
          kredit/pembiayaan       ditopang     oleh       household consumption. Overall, these
          permintaan korporasi dan konsumsi rumah         positive developments in banking
          tangga yang tetap baik. Secara                  intermediation have contributed to
          keseluruhan, perkembangan intermediasi          economic recovery.
          perbankan yang positif ini turut
          mendukung pemulihan ekonomi.

          Ketahanan sistem keuangan, khususnya            The resilience of the financial system,
          perbankan, tetap terjaga baik dari sisi         especially banking, is maintained both in
          permodalan       maupun        likuiditas.      terms of capital and liquidity. Banking
          Permodalan perbankan tetap kuat dengan          capital remains strong with the October
          rasio kecukupan modal (Capital Adequacy         2022 capital adequacy ratio (CAR)
          Ratio/CAR) Oktober 2022 tetap tinggi            remaining high at 25.08%. Along with
          sebesar 25,08%. Seiring dengan kuatnya          strong capital, risk remains under control
          permodalan, risiko tetap terkendali yang        as reflected in the ratio of non-performing
          tercermin dari rasio kredit bermasalah          loans (NPL) in October 2022 which was
          (Non Performing Loan/NPL) pada                  recorded at 2.72% (gross) and 0.78% (net).
          Oktober 2022 yang tercatat 2,72% (bruto)        Banking liquidity in November 2022 was
          dan 0,78% (neto). Likuiditas perbankan          maintained supported by growth in Third
          pada November 2022 tetap terjaga                Party Funds (DPK) of 8.80% (yoy). Bank
          didukung oleh pertumbuhan Dana Pihak            Indonesia's simulation results show that
          Ketiga (DPK) sebesar 8,80% (yoy). Hasil         banking resilience is still maintained.
          simulasi Bank Indonesia menunjukkan             Going forward, Bank Indonesia will
          bahwa ketahanan perbankan masih terjaga.        continue to strengthen synergies with the
          Ke depan, Bank Indonesia akan terus             KSSK in mitigating various domestic and
          memperkuat sinergi dengan KSSK dalam            global macroeconomic risks that could
          memitigasi berbagai risiko makroekonomi         undermine financial system resilience.
          domestik dan global yang dapat
          mengganggu ketahanan sistem keuangan.

          Bank     Indonesia    terus    mendorong        Bank Indonesia continues to promote
          peningkatan efisiensi sistem pembayaran         efficiency improvements in the payment
          melalui    penguatan     kebijakan    dan       system through strengthening policies and
          akselerasi digitalisasi untuk menjaga           accelerating digitalization to maintain the
          momentum pemulihan ekonomi. Transaksi           momentum of economic recovery. Digital
          ekonomi dan keuangan digital meningkat          economic and financial transactions have
          ditopang oleh naiknya akseptasi dan             increased supported by increasing public
          preferensi masyarakat dalam berbelanja          acceptance and preference for online
          daring, luasnya dan mudahnya sistem             shopping, the breadth and ease of digital
          pembayaran digital, serta cepatnya digital      payment systems, and the speed of digital
          banking. Nilai transaksi uang elektronik        banking. The value of electronic money
          (UE) pada November 2022 tumbuh                  (EU) transactions in November 2022 grew
          12,84% (yoy) mencapai Rp 35,3 triliun           12.84% (yoy) to reach IDR 35.3 trillion,

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                         B.16
Page 40
          sedangkan nilai transaksi digital banking         while the value of digital banking
          meningkat 13,88% (yoy) menjadi Rp                 transactions increased 13.88% (yoy) to
          4.561,2 triliun sejalan dengan normalisasi        IDR 4,561.2 trillion in line with the
          mobilitas masyarakat. Selain itu, nilai           normalization of people's mobility. In
          transaksi pembayaran menggunakan kartu            addition, the value of payment transactions
          ATM, kartu debet, dan kartu kredit juga           using ATM cards, debit cards and credit
          meningkat 16,85% (yoy) menjadi Rp                 cards also increased 16.85% (yoy) to Rp
          664,9 triliun. Sementara itu, jumlah Uang         664.9 trillion. Meanwhile, the amount of
          Kartal Yang Diedarkan (UYD) pada                  currency in circulation (UYD) in
          November 2022 meningkat 7,77% (yoy)               November 2022 increased 7.77% (yoy) to
          mencapai Rp 935,2 triliun. Bank Indonesia         Rp 935.2 trillion. Bank Indonesia
          terus memastikan ketersediaan uang                continues to ensure the availability of
          Rupiah dengan kualitas yang terjaga di            quality Rupiah currency throughout the
          seluruh wilayah NKRI serta memastikan             Unitary State of the Republic of Indonesia
          kelancaran sistem pembayaran nasional             and ensures the smooth operation of the
          mengantisipasi Natal dan Tahun Baru.              national payment system in anticipation of
                                                            Christmas and New Year.




                                             ********************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                           B.17
Page 41
      C. PENDEKATAN PENILAIAN/APPROACH OF VALUATION


          Pendekatan-pendekatan yang digunakan             Approaches applied in this valuation are
          dalam penilaian ini adalah sebagai berikut:      as follows:

          - Pendekatan Pendapatan                          - Income Approach

             Dalam melakukan penilaian Obyek                 In the valuation of the Object of
             Penilaian yang berupa properti yang             Valuation in the form of property that
             memiliki potensi untuk menghasilkan             has the potential to generate income but
             pendapatan namun relatif sederhana,             is relatively simple, the valuation
             metode penilaian yang digunakan                 method used is the Gross Income
             adalah metode Gross Income Multiplier           Multiplier method.
             (GIM).

             Dalam penilaian menggunakan metode              In the valuation used the GIM method,
             GIM, indikasi nilai pasar Obyek                 an indication of the market value of the
             Penilaian dihasilkan dari konversi              Object of Valuation is generated from
             pendapatan kotor tahunan (potential             the conversion of potential gross annual
             gross income/PGI) yang mencerminkan             income (PGI) that reflects and
             dan mewakili pendapatan tahunan                 represents the future annual income of
             Obyek Penilaian di masa yang akan               the Object of Valuation with a certain
             datang dengan konstanta tertentu yang           constant commonly referred to as GIM.
             biasa disebut dengan GIM.
                                                             For conducting the valuation used the
             Untuk melaksanakan penilaian dengan             GIM method, we consider sales and
             metode GIM, kami memperhatikan                  leases of comparable and similar
             penjualan dan sewa properti yang                properties     that      have     similar
             sebanding dan sejenis serta memiliki            characteristics in terms of physical,
             kesamaan karakteristik baik dalam hal           location, and investment characteristics,
             fisik, lokasi, dan karakteristik investasi,     if any, records, interviews with persons
             bila      ada,     pencatatan-pencatatan,       or officials and other property owners
             wawancara-wawancara dengan orang-               who are familiar with property values
             orang atau pejabat-pejabat dan pemilik-         and rents in the area and comparable
             pemilik      properti    lainnya     yang       offers. The data is then analyzed to
             mengetahui benar mengenai nilai-nilai           obtain the GIM of the Object of
             properti dan harga sewa di daerah itu           Valuation.
             serta penawaran yang sebanding. Data
             tersebut kemudian dianalisa untuk
             memperoleh        GIM      dari     Obyek
             Penilaian.

             Untuk mendapatkan indikasi nilai pasar          To obtain an indication of the market
             Obyek Penilaian, GIM yang telah                 value of the Object of Valuation, the
             diperoleh tersebut dikalikan dengan             GIM that has been obtained is
             PGI atau pendapatan kotor tahunan               multiplied by the PGI or annual gross
             Obyek Penilaian.                                income of the Object of Valuation.

          - Pendekatan Biaya (Cost Approach)               - Cost Approach

             Pendekatan biaya adalah pendekatan              The cost approach is a valuation
             penilaian untuk mendapatkan nilai               approach to obtain an indication of the
             Obyek Penilaian berdasarkan biaya               value of the Object of Valuation based

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                           C.1
Page 42
             reproduksi baru (reproduction cost             on the cost of reproduction new or cost
             new) atau biaya pengganti baru                 of replacement new cut-off date after
             (replacement cost new) pada tanggal            deducting depreciation.
             penilaian (cut off date) setelah
             dikurangi dengan penyusutan.

             Biaya reproduksi baru/biaya pengganti          Cost of reproduction new/cost of
             baru         dihitung          dengan          replacement new are calculated by
             mempertimbangkan biaya-biaya yang              considering the costs incurred for the
             dikeluarkan untuk pengadaan suatu              procurement of a property including
             properti meliputi biaya perencanaan            planning and supervision costs, unit or
             dan pengawasan, biaya pengadaan unit           material procurement costs, foundation
             atau material, biaya pondasi, biaya            costs, construction or installation costs,
             konstruksi atau instalasi, termasuk            including all standard expenses related
             semua pengeluaran standar yang                 to transportation, insurance, import
             berkaitan dengan angkutan, asuransi,           duties, taxes, and interest costs during
             bea masuk, pajak, dan biaya bunga              the construction period, but excluding
             selama masa konstruksi, tetapi tidak           costs due to time delays and overtime
             termasuk biaya akibat penundaan waktu          costs.
             dan biaya lembur.

             Pendekatan biaya digunakan dalam               Cost approach is used in valuation of
             penilaian Obyek Penilaian yang berupa          the Object of Valuation in the form of
             bangunan dan sarana pelengkap                  buildings and other land improvement
             lainnya, dengan mempertimbangkan               considering        that      cost    of
             bahwa biaya reproduksi baru/biaya              reproduction/replacement new and
             pengganti baru dan penyusutan dari             depreciation of the Object of Valuation
             Obyek Penilaian yang berupa bangunan           in the form of buildings and other land
             dan sarana pelengkap lainnya dapat             improvement can be estimated and at
             diperkirakan.                                  the time of site inspection.

          - Pendekatan Pasar (Market Approach)            - Market Approach

             Pendekatan pasar adalah pendekatan             The market approach is a valuation
             penilaian yang menggunakan data                approach that uses transaction or
             transaksi atau penawaran atas properti         offering data on properties that are
             yang sebanding dan sejenis dengan              comparable and similar to the Object of
             Obyek Penilaian yang didasarkan pada           Valuation which is based on a
             suatu proses perbandingan dan                  comparison and adjustment process.
             penyesuaian.

             Pendekatan pasar dilakukan dengan              The market approach is carried out by
             memperhatikan                       dan        taking into account and considering
             mempertimbangkan data penjualan dan            data on sales and/or data on property
             atau data penawaran properti yang              offers that are comparable and similar
             sebanding dan sejenis serta memiliki           and      have       similar       physical
             kesamaan karakteristik baik dalam hal          characteristics such as location, area
             fisik seperti lokasi, luas dan bentuk          and shape of land, frontage, nature of
             tanah, sisi tanah yang berhadapan              ownership/type        of       certificate,
             dengan       jalan     (frontage), sifat       topography, condition of land surface,
             kepemilikan/jenis sertifikat, topografi,       and accessibility, and other if any.
             keadaan permukaan tanah, dan mudah
             atau tidaknya dicapai (accessibility),
             serta lain-lain bila ada.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                            C.2
Page 43
             Pendekatan pasar digunakan dalam                    The market approach is applied in this
             penilaian          ini         dengan               valuation considering that there are
             mempertimbangkan bahwa pada saat                    sufficient amount of listings and
             penilaian dilakukan diperoleh data                  offerings of comparable assets which in
             pembanding properti yang sebanding                  our opinion are appropriate to be used
             dan sejenis yang dapat digunakan                    in the process of land valuation.
             dalam proses penilaian Obyek Penilaian
             yang berupa tanah.

      Pendekatan-pendekatan dan metode-metode                We apply the approaches and methods
      tersebut di atas kami aplikasikan dengan               mentioned above by taking into account the
      memperhatikan karakteristik aset-aset yang             characteristics of the assets that are
      menjadi bagian-bagian dari Obyek Penilaian             components of the Object of Valuation as
      sebagai berikut:                                       follows:

      - Penilaian atas Obyek Penilaian dilakukan          - The valuation of the Object of Valuation is
        dengan       menggunakan      pendekatan            carried out using income approach with
        pendapatan dengan metode GIM dan                    GIM method and cost approach
        pendekatan biaya.

         Dalam penilaian menggunakan metode                  In the valuation used the GIM method, an
         GIM, indikasi nilai pasar Obyek Penilaian           indication of the market value of the Object
         dihasilkan dari konversi pendapatan kotor           of Valuation is generated from the
         tahunan PGI yang mencerminkan dan                   conversion of PGI that reflects and
         mewakili pendapatan tahunan Obyek                   represents future annual income of the
         Penilaian di masa yang akan datang dengan           Object of Valuation with a certain constant
         konstanta tertentu yang biasa disebut               commonly referred as GIM.
         dengan GIM.

         Pendekatan biaya digunakan dalam                    The cost approach is used in the valuation
         penilaian Obyek Penilaian yang berupa               of the Object of Valuation in the form of
         bangunan dan sarana pelengkap lainnya               buildings and other land improvements by
         dengan mempertimbangkan bahwa biaya                 considering that the cost of reproduction
         reproduksi baru/biaya pengganti baru dan            new/cost of replacement new and
         penyusutan dari bangunan dan sarana                 depreciation of buildings and other land
         sarana     pelengkap     lainnya    dapat           improvements can be estimated. Especially
         diperkirakan. Khusus untuk penilaian                for land valuation, the approach used is the
         tanah, pendekatan yang digunakan adalah             market data approach. The market approach
         pendekatan data pasar. Pendekatan pasar             is a valuation approach that uses transaction
         adalah    pendekatan     penilaian   yang           or offering data on comparable and similar
         menggunakan      data     transaksi   atau          properties to the valuation object based on a
         penawaran atas properti yang sebanding              comparison and adjustment process.
         dan sejenis dengan Obyek Penilaian yang
         didasarkan pada suatu proses perbandingan
         dan penyesuaian.

         Mengingat bahwa Obyek Penilaian dinilai             Given that the Object of Valuation is valued
         dengan menggunakan 2 (dua) pendekatan,              using 2 (two) approaches, then the
         selanjutnya indikasi nilai yang diperoleh           indication of the value obtained from each
         dari     tiap-tiap   pendekatan      tersebut       of these approaches is reconciled by
         direkonsiliasi      dengan        melakukan         carrying out a weighting to obtain a
         pembobotan untuk memperoleh kesimpulan              conclusion on the value of the Object of
         nilai sebagai kesatuan unit operasional.            Valuation as an operational unit.

                                              ******************
Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                               C.3
Page 44
      D.    URAIAN PENILAIAN/VALUATION DESCRIPTION


      D.1 PENDEKATAN PENILAIAN                                 D.1 VALUATION APPROACH
          YANG DIGUNAKAN                                           APPLIED

      –     PENDEKATAN BIAYA                                   –       COST APPROACH

            Pendekatan biaya adalah pendekatan                         The cost approach is a valuation
            penilaian untuk mendapatkan indikasi                       approach in which the value of the
            nilai Obyek Penilaian yang berupa                          Object of Valuation in the form of
            bangunan dan sarana pelengkap lainnya                      buildings and other land improvements is
            berdasarkan biaya reproduksi baru                          obtained      based    on     cost   of
            (reproduction cost new) atau biaya                         reproduction/replacement new on the
            pengganti baru (replacement cost new)                      date of valuation, after deducted with
            pada tanggal penilaian (cut off date)                      depreciation.
            setelah dikurangi dengan penyusutan.

            Pada pendekatan ini, nilai pasar Obyek                     In this valuation, market value of the
            Penilaian yang berupa bangunan                             Object of Valuation in form of buildings
            diperoleh dengan terlebih dahulu                           is calculated by estimating the
            mengestimasi biaya pengganti baru                          replacement cost new (RCN) of the
            (BPB) Obyek Penilaian yang berupa                          Object of Valuation in form of buildings
            bangunan dengan menggunakan metode                         used the square meter method which is
            meter persegi (square meter method)                        calculated based on the per meter square
            yang dihitung dengan mengacu pada data                     RCN reference data for buildings in Kota
            standar BPB per meter persegi bangunan                     Bekasi (obtained from MAPPI), which is
            Kota Bekasi (diperoleh dari MAPPI),                        then adjusted by considering the
            yang kemudian disesuaikan dengan                           materials used in the buildings. After
            mempertimbangkan            bahan-bahan                    such adjustments, the RCN is then
            bangunan     yang    digunakan     pada                    deducted by physical, functional, and
            bangunan. Setelah disesuaikan, BPB                         external depreciation of the buildings and
            tersebut kemudian dikurangi dengan                         other land improvements.
            penyusutan/depresiasi fisik, fungsional,
            dan eksternal dari bangunan dan sarana
            pelengkap lainnya.

            Nilai pasar tanah diperoleh dengan                         Market value of land using the the
            menggunakan pendekatan pendekatan                          market approach. The market approach is
            pasar.   Pendekatan     pasar   adalah                     a valuation approach which considers the
            pendekatan penilaian yang menggunakan                      transaction or offering of similar
            data transaksi atau penawaran atas                         properties comparable to the Object of
            properti yang sebanding dan sejenis                        Valuation in the form of land and
            dengan Obyek Penilaian yang didasarkan                     establishes a value estimate based on
            pada suatu proses perbandingan dan                         processes involving comparison and
            penyesuaian.                                               adjustment.

            Penyesuaian dilakukan dengan langsung                      These data are then analyzed and
            membandingkan secara keseluruhan                           adjustments are made for the differences
            perbedaan dan kesamaan karakteristik                       between the Object of Valuation and the
            antara Obyek Penilaian dengan data                         comparable assets
            pembanding properti yang berhasil
            dikumpulkan.


Penilaian Properti Yang Disusun untuk PT Catur Sentosa Adiprana Tbk/
Valuation of Property Compiled for PT Catur Sentosa Adiprana Tbk                                             D.1
Page 45
            Prosedur penyesuaian yang dilakukan           The adjustment procedures used in the
            dalam     proses    penilaian dengan          market approach are as follows:
            menggunakan pendekatan data pasar
            adalah sebagai berikut:

            a. Data pembanding yang berupa data           a. Offering prices of the comparables are
               penawaran properti yang sebanding             discounted to reflect the estimate
               dan sejenis dengan Obyek Penilaian            transaction prices.
               diberi diskon untuk merefleksikan
               estimasi harga transaksi.
            b. Setelah estimasi harga transaksi untuk     b. After the estimate transaction prices
               masing-masing data pembanding                 for each comparable property are
               diperoleh, dilakukan penyesuaian              determined, adjustments are made for
               untuk perbedaan-perbedaan dalam hal           differences in characteristics between
               karakteristik antara Obyek Penilaian          the Object of Valuation and each
               dan tiap-tiap data pembanding,                comparable property, to make each
               dengan tujuan untuk sedapat mungkin           comparable property as close as
               menyamakan masing-masing data                 possible to the Object of Valuation. A
               pembanding dengan Obyek Penilaian.            comparable property which is better in
               Apabila data pembanding memiliki              a certain characteristic compared to
               karakteristik yang lebih baik daripada        the Object of Valuation will be given
               Obyek Penilaian, maka dilakukan               negative adjustment in the estimate
               penyesuaian      negatif,    sedangkan        transaction price, and a comparable
               apabila data pembanding memiliki              property which is worse in a certain
               karakteristik yang lebih jelek daripada       characteristic compared to the Object
               Obyek Penilaian, maka dilakukan               of Valuation will be given positive
               penyesuaian positif.                          adjustment in the estimate transaction
                                                             price.

            c. Setelah penyesuaian untuk masing-          c. After adjustments for each comparable
               masing data pembanding dilakukan,             property are made, market value of the
               kesimpulan indikasi nilai pasar Obyek         Object of Valuation in the form of
               Penilaian      diperoleh       dengan         land is concluded using weighted
               melakukan rata-rata tertimbang dari           average of the adjusted prices of each
               indikasi nilai masing-masing data             comparable property. Weight for each
               pembanding yang telah disesuaikan.            comparable property is determined
               Bobot dari tiap-tiap data pembanding          based on the amount of adjustments
               ditentukan berdasarkan besar kecilnya         made. Comparable property with more
               penyesuaian yang dilakukan. Data              adjustments (in absolute value) is
               pembanding dengan penyesuaian yang            given     smaller    weight,     while
               lebih besar (secara absolut) diberi           comparable property with less
               bobot yang lebih kecil, sedangkan             adjustments (in absolute value) is
               data pembanding dengan penyesuaian            given bigger weight.
               yang lebih kecil (secara absolut)
               diberi bobot yang lebih besar.

            Dengan       demikian,     berdasarkan        Therefore, based on cost approach,
            pendekatan biaya, indikasi nilai pasar        market value of the Object of Valuation
            Obyek Penilaian yang berupa tanah,            in the form of land, buildings and other
            bangunan dan sarana pelengkap lainnya         land improvements, can be calculated by
            dapat dihitung dengan formula sebagai         the following formula:
            berikut:



Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                        D.2
Page 46
            Nilai Pasar = (BPB      -    [BPB    ×        Market Value =     (RCN - [RCN ×
                          Penyusutan/Depresiasi])                            Depreciation]) +
                          + Nilai Pasar Tanah                                Market Value of
                                                                             Land


            PROSEDUR PENILAIAN                            VALUATION PROCEDURES

            Sesuai dengan pendekatan dan metode           In accordance with the approach of
            penilaian yang telah diuraikan di atas,       valuation    mentioned      above,    the
            untuk menentukan nilai pasar Obyek            procedure to determine the market value
            Penilaian yang berupa bangunan dan            of the Object of Valuation in the form of
            sarana pelengkap lainnya, berdasarkan         buildings and other land improvements,
            pendekatan biaya kami melakukan               are as follows:
            perhitungan berdasarkan kondisi pasar
            dengan prosedur yang dijelaskan dalam
            uraian berikut ini.

            1. BPB                                        1. RCN

                BPB Obyek Penilaian yang berupa               The RCN of the Object of Valuation
                bangunan dan sarana pelengkap                 in the form of buildings and other
                lainnya      diestimasi      dengan           land improvements is estimated by
                menggunakan metode meter persegi              using the square meter method
                yang dihitung dengan mengacu pada             which is calculated based on the per
                data standar BPB per meter persegi            meter square RCN reference data for
                bangunan Kota Bekasi (diperoleh               buildings in Kota Bekasi (obtained
                dari MAPPI), yang kemudian                    from MAPPI), which is then
                disesuaikan                  dengan           adjusted by considering the materials
                mempertimbangkan        bahan-bahan           used in the buildings and other land
                bangunan yang digunakan pada                  improvements.
                bangunan dan sarana pelengkap
                lainnya.

            2. Penyusutan/Depresiasi                      2. Depreciation

                Penyusutan/depresiasi atas Obyek              Depreciation of the Object of
                Penilaian yang berupa bangunan dan            Valuation in the form of buildings
                sarana pelengkap lainnya diestimasi           and other land improvements is
                menggunakan metode breakdown                  estimated by considering the
                yaitu dengan mempertimbangkan                 physical, functional, and external
                kondisi fisik, fungsional, dan                condition of the Object of Valuation
                eksternal dari Obyek Penilaian yang           in the form of buildings and other
                berupa bangunan dan sarana                    land improvements.
                pelengkap lainnya.

            3. Nilai Pasar Obyek Penilaian                3. Market Value of the Object of
                                                             Valuation

                Nilai pasar Obyek Penilaian yang             Market value of the Object of
                berupa bangunan dan sarana                   Valuation in the form of buildings,
                pelengkap lainnya, diperoleh dengan          other land improvements, and
                mengurangkan            penyusutan/          machinery and hotel equipment is
                depresiasi terhadap BPB Obyek                obtained by deducting depreciation

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                        D.3
Page 47
                Penilaian yang berupa bangunan dan                         to RCN of the Object of Valuation in
                sarana pelengkap lainnya.                                  the form of buildings and other land
                                                                           improvements.


            PENILAIAN                                                  VALUATION

            Dari perhitungan dengan menggunakan                        From the calculation using the cost
            pendekatan biaya, diperoleh hasil bahwa                    approach, the market value of the Object
            nilai pasar Obyek Penilaian yang berupa                    of Valuation in the form of land,
            tanah, bangunan, dan sarana pelengkap                      buildings, and other land improvements
            lainnya          adalah          sebesar                   is      Rp 419,339,100,000.00       The
            Rp 419.339.100.000,00            dengan                    calculation summary of the Object
            ringkasan perhitungan sebagai berikut:                     Valuation is as follows:



            -   Ringkasan Perhitungan Indikasi Nilai Pasar Obyek Penilaian/
                Summary of Calculation of the Indicated Market Value of the Object of the Valuation


                                                                                                   Nilai Pasar/
                                         Uraian/Description                      Luas/Area        Market Value
                                                                                                  (Rp ,000.00)

                 1. Tanah/Land                                                   20.919,00   m²     330.520.200
                 2. Bangunan/Buildings
                  -   Outlet Mitra10                                             17.695,00   m²      71.764.000
                  -   Gudang & Risefloor/Warehouse & Risefloor                    4.048,00   m²      15.733.100
                  -   Pos Jaga/Guard Post                                            30,00   m²          64.800
                  -   Rumah Control Room /Control Room House                         27,00   m²          63.800
                  -   Rumah Genset/Generator House                                   44,00   m²         103.900
                  -   Rumah Trafo/Trafo House                                        24,00   m²          56.700
                  -   Musholla/Prayer Room                                           96,00   m²         207.300
                  -   Rumah Pompa Lama/Old Waterpump House                           50,00   m²         112.200
                  -   Rumah Genset Lama/Old Generator House                          56,00   m²         125.600
                  Total Bangunan/Total Buildings                                 22.070,00   m²      88.231.400
                 3. Sarana Pelengkap Lainnya/Other Land Improvements
                  - Pagar keliling/Parimeter Fence                                                      106.800
                  - Perkerasan halaman/Courtyard Pavement                                               480.700
                  Total Sarana Pelangkap Lainnya/Total Other Land Improvements                          587.500
                 Total                                                                              419.339.100




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                           D.4
Page 48
            -   Ringkasan Perhitungan Indikasi Nilai Pasar Tanah/
                Summary of Calculation of the Indicated Market Value of the Land


                                                                                    DATA
                 No            Uraian               Properti Yang Dinilai           Data 1                     Data 2                       Data 3                   Valuation Object                Description           No
                                                                                        1                         2                            3
                 1. Nama Jalan                  Jl. Raya Alternatif Cibubur  Jl. Alternatif Cibubur    Jl. Alternatif Cibubur       Jl/ Alternatif Cibubur           Jl. Raya Alternatif                            Street 1.
                    Kelurahan/Desa                      Jatirangga                    Nagrak                Jatisampurna                  Harjamukti                     Jatirangga                                District
                    Kecamatan                          Jatisampurna               Gunung Putri              Jatisampurna                  Cimanggis                     Jatisampurna                          Sub District
                    Kotamadya/Kabupaten                    Bekasi                     Bogor                     Bekasi                       Depok                          Bekasi                 Municipality / Regency
                    Propinsi                            Jawa Barat                 Jawa Barat                Jawa Barat                   Jawa Barat                     Jawa Barat                               Province
                    Koordinat Lokasi            6°22'52.7"S 106°55'51.8"E 6°23'07.3"S 106°56'03.9"E 6°22'37.9"S 106°55'11.8"E 6°22'32.4"S 106°54'14.5"E
                 2. Luas tanah (m²)                                  20.919                 16.091,00                 32.000,00                       2.000,00                     20,919              Land area (m²)       2.
                 3. Luas bangunan (m²)                               22.070                   9.793,00                                                       -                     22,070           Building area (m²)      3.
                 4. Harga Penawaran (Rp)                                             300.000.000.000           480.000.000.000                 44.000.000.000                                     Offering Price (Rp)       4.
                 5. Status                                                        Penawaran                  Penawaran          Transaksi 2021Bln Juli/Agstus                                                   Status      5.
                 6. Diskon                                                            10,0%                     10,0%                        0,0%                                                            Discount       6.
                 7. Peruntukan sesuai tata kota   Perdagangan dan Jasa             Campuran                  Campuran                     Campuran                     Trade and Service Allotment according to urban       7.
                 8. Tanda bukti kepemilikan               SHGB                        SHGB                       SHM                         SHM                                  SHGB             Proof of ownership       8.
                 9. Penggunaan                             Hotel            Tanah dan Bangunan             Tanah Kosong                 Tanah Kosong                               Hotel                    Utilization     9.
                                                                                  ANALISA
                 10. Harga setelah diskon (Rp)                                      270.000.000.000            432.000.000.000                  44.000.000.000                                    Price after discount (Rp) 10.
                 11. Asumsi biaya penggantian baru bangunan (Rp/m²)                       3.219.231                        -                               -                Assumption of replacement cost new (Rp/m²) 11.
                 12. Asumsi kondisi bangunan                                         50,0%                      60,0%                        0,0%                                        Assumption of building condition 12.
                 13. Indikasi harga pasar bangunan (Rp)                              15.762.964.592                        -                               -                    Indication of maket value of building (Rp) 13.
                 14. Indikasi harga pasar tanah (Rp)                                254.237.035.409            432.000.000.000                  44.000.000.000                      Indication of maket value of land (Rp) 14.
                 15. Indikasi harga pasar tanah (Rp/m²)                                  15.799.952                 13.500.000                      22.000.000                  Indication of maket value of land (Rp/m²) 15.
                 16. Analisa penyesuaian nilai tanah per m²                                                                                                                    Analysis of adjusting land values per m² 16.
                     a. Waktu (Penawaran/Transaksi)                               0,0%              0        0,0%                0       0,0%                  0                      Time (Offering/Transaction) a.
                     b. Lokasi                                                                                                                                                                             Location b.
                        - Tepi jalan                                               0,0%             0        0,0%                0       0,0%                  0                                      Road side -
                        - Sudut jalan                                              0,0%             0        0,0%                0       0,0%                  0                                          Corner -
                        - Tusuk sate                                               0,0%             0        0,0%                0       0,0%                  0                           Located at T junction -
                        - Cul de sac                                               0,0%             0        0,0%                0       0,0%                  0                                     Cul de sac -
                        - Jarak thdp jln utama                                     0,0%             0        0,0%                0       0,0%                  0                    Distance to main street          -
                        - Jarak thdp pusat Keramaian                               0,0%             0        0,0%                0       0,0%                  0                  Distance to business activity -
                        - Kondisi/sifat tanah (keras/lembek)                       0,0%             0        0,0%                0       0,0%                  0                     Conditions/soil (hard/soft) -
                        - Tepi pantai                                              0,0%             0        0,0%                0       0,0%                  0                                    Beach Side -
                        - Tepi sungai                                              0,0%             0        0,0%                0       0,0%                  0                                      River side -
                        - Kelas jalan                                              0,0%             0        0,0%                0       0,0%                  0                                    Road Class -
                        - Bebas/rawan banjir                                       0,0%             0        0,0%                0       0,0%                  0                       Free/prone to flooding -
                        - Kenyamanan                                               0,0%             0        0,0%                0       0,0%                  0                                      Amenities -
                           - Dekat pasar                                           0,0%             0        0,0%                0       0,0%                  0                      Near traditional markt -
                           - Dekat Bandara                                         0,0%             0        0,0%                0       0,0%                  0                               Near railroad -
                           - Dekat SPBU                                            0,0%             0        0,0%                0       0,0%                  0                           Near Gas Station -
                           - Dekat rel kereta api                                  0,0%             0        0,0%                0       0,0%                  0                    Road Traffic Conditions -
                           - Dekat (TPU)                                           0,0%             0        0,0%                0       0,0%                  0                               Near toll gate -
                     c. Ukuran                                                    -5,0%       -789.998      10,0%         1.350.000    -20,0%          -4.400.000                                                Size c.
                     d. Kontur/Topografi                                                                                                                                                      Contour/Topography d.
                        - Kontur (datar/bergelombang)                             0,0%              0        0,0%                0       0,0%                  0                          Countour (flat/bumpy) -
                        - Elevasi (dibawah/diatas permukaan jalan)                0,0%              0        5,0%          675.000       0,0%                  0       Elevation (under/above road surface) -
                     e. Asesibilitas/pencapaian                                   0,0%              0        0,0%                0       0,0%                  0                                       Accessibility d.
                     f. Tanda bukti kepemilikan                                   5,0%        789.998        0,0%                0       0,0%                  0                                        Ownership f.
                     g. Bentuk tanah                                              0,0%              0        0,0%                0       0,0%                  0                                        Land Shape g.
                     h. Penggunaan tanah                                          0,0%              0        0,0%                0       0,0%                  0                                    Land Utilization h.
                     i. Peraturan (kdb/klb)                                       0,0%              0        0,0%                0       0,0%                  0                               Regulation (kdb/klb) i.
                     j. Peruntukan                                                0,0%              0        0,0%                0       0,0%                  0                                             Zoning j.
                     k. Kelangkaan                                                0,0%              0        0,0%                0       0,0%                  0                                            Scarcity k.
                     l. Fasilitas                                                                                                                                                                             Facility l.
                        - Listrik                                                 0,0%              0        0,0%                0       0,0%                  0                                       Electricity -
                        - Telepon                                                 0,0%              0        0,0%                0       0,0%                  0                                     Telephone -
                        - Air Bersih                                              0,0%              0        0,0%                0       0,0%                  0                                   Fresh Water -
                        - Pengolahan Limbah                                       0,0%              0        0,0%                0       0,0%                  0                               Waste treatment -
                     m. Fasilitas Sosial dan Umum                                 0,0%              0        0,0%                0       0,0%                  0      Industrial Zoning (Heavy, Medium, Light) m.
                        - Pendidikan                                              0,0%              0        0,0%                0       0,0%                  0                                        Security -
                        - Keamanan                                                0,0%              0        0,0%                0       0,0%                  0            Social facilities and public facilities n
                     n Fasus & Fasom/Perkembangan Lingkungan                      0,0%              0        0,0%                0      -5,0%          -1.100.000     Environmental & social economic quality o
                                                                      Total       0,0%              0       15,0%         2.025.000    -25,0%          -5.500.000   Total

                 17. Indikasi nilai tanah (Rp/m²)                                         15.799.952                15.525.000                       16.500.000                            Indication of land value (Rp/m²) 17.

                 18. Persentase pembobotan                        100,00%           48,39%                     32,26%                      19,35%                   100,00%                       Percentage of weighting 18.

                 19. Nilai hasil pembobotan (Rp)                                           7.645.138                 5.008.065                        3.193.548                                  The weighted value (Rp) 19.

                 20. Nilai pasar tanah (Rp/m²)                  15.846.751                                  Contact Person                                                     15,846,751      Land market value (Rp/m²) 20.
                 21. Dibulatkan (Rp/m²)                         15.800.000                                                                                                     15,800,000            Rounded (Rp/m²) 21.
                 22. Nilai pasar tanah (Rp)               330.520.000.000     Ibu Devina Pratiwi              Ibu Sarah                 Bpk. Kinanto                   330,520,000,000        Market value of land (Rp) 22.
                                                                                0811 820 9500              0878 6985 1989               0818 886 402




      –     PENDEKATAN PENDAPATAN                                                                              –             INCOME APPROACH

            Pendekatan pendapatan merupakan suatu                                                                             Income approach is a valuation approach
            pendekatan penilaian dimana nilai suatu                                                                           where the value of a property is
            properti    ditentukan     berdasarkan                                                                            determined based on its ability to
            kemampuan properti tersebut untuk                                                                                 generate future profits over its economic
            menghasilkan keuntungan di masa                                                                                   life.
            mendatang selama umur ekonomisnya.

            Dalam penilaian Obyek Penilaian, nilai                                                                            In the valuation used the GIM method,
            Obyek Penilaian dihasilkan dari konversi                                                                          an indication of the market value of the
            pendapatan kotor tahunan (potential                                                                               Object of Valuation is generated from

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                                                                                                                                D.5
Page 49
            gross income/PGI) yang mencerminkan           the conversion of potential gross annual
            dan mewakili pendapatan tahunan Obyek         income (PGI) that reflects and represents
            Penilaian di masa yang akan datang            the future annual income of the Object of
            dengan konstanta tertentu yang biasa          Valuation with a certain constant
            disebut dengan GIM.                           commonly referred to as GIM.

            Untuk melaksanakan penilaian dengan           For conducting the valuation used the
            metode GIM, kami memperhatikan                GIM method, we consider sales and
            penjualan dan sewa properti yang              leases of comparable and similar
            sebanding dan sejenis serta memiliki          properties      that     have     similar
            kesamaan karakteristik baik dalam hal         characteristics in terms of physical,
            fisik, lokasi, dan karakteristik investasi,   location, and investment characteristics,
            bila      ada,     pencatatan-pencatatan,     if any, records, interviews with persons
            wawancara-wawancara dengan orang-             or officials and other property owners
            orang atau pejabat-pejabat dan pemilik-       who are familiar with property values
            pemilik      properti    lainnya     yang     and rents in the area and comparable
            mengetahui benar mengenai nilai-nilai         offers. The data is then analyzed to
            properti dan harga sewa di daerah itu         obtain the GIM of the Object of
            serta penawaran yang sebanding. Data          Valuation.
            tersebut kemudian dianalisa untuk
            memperoleh GIM dari Obyek Penilaian.

            Untuk mendapatkan indikasi nilai pasar        To obtain an indication of the market
            Obyek Penilaian, GIM yang telah               value of the Object of Valuation, the
            diperoleh tersebut dikalikan dengan PGI       GIM that has been obtained is multiplied
            atau pendapatan kotor tahunan Obyek           by the PGI or annual gross income of the
            Penilaian.                                    Object of Valuation.


            PROSEDUR PENILAIAN                            VALUATION PROCEDURES

            Sesuai dengan pendekatan dan metode           In accordance with the approach and
            penilaian yang telah diuraikan di atas,       method of valuation described above, to
            untuk menentukan indikasi nilai pasar         determine the indication of market value
            Obyek Penilaian kami melakukan                of the Object of the Valuation we
            perhitungan berdasarkan kondisi pasar         perform calculations based on market
            dengan prosedur yang akan dijelaskan          conditions with the procedures described
            dalam uraian berikut ini:                     in the following description:


            1. Pendapatan Kotor Tahunan                   1. Annual Gross Income

                Mengestimasi pendapatan kotor                 Estimates the gross annual income of
                tahunan dari Obyek Penilaian yang             the Object of Valuation obtained
                diperoleh dari properti yang                  from comparable and similar
                sebanding dan sejenis dengan Obyek            properties to the Object of
                Penilaian. Pendapatan kotor tahunan           Valuation. The gross annual income
                yang dimaksud adalah PGI.                     referred to is PGI.


            2. Harga Jual                                 2. Sale Price

                Mengestimasi harga jual Obyek                 Estimating the selling price of the
                Penilaian   dengan   melakukan                Object of Valuation by making

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                        D.6
Page 50
                penyesuaian yang diperoleh dari                adjustments      obtained      from
                pembanding properti yang sebanding             comparable and similar properties to
                dan sejenis dengan Obyek Penilaian.            the Object of Valuation.

            3. Penentuan GIM                               3. Determination of GIM

                                 Harga jual (value)                            Sale price (value)
                GIM =                                          GIM =
                                Potential    gross                            Potential    gross
                                income (PGI)                                  income (PGI)

            4. Penentuan Nilai                             4. Determination of Value

                Indikasi nilai pasar Obyek Penilaian           The indication of the market value of
                dihitung dengan cara mengalikan                the Object of Valuation is calculated
                PGI dengan rata-rata GIM yang                  by multiplying the PGI by the
                diperoleh.                                     average GIM obtained.


            PENENTUAN GIM                                  DETERMINATION OF GIM

            Dalam penilaian ini GIM diperoleh dari         In this valuation, GIM is derived from
            perbandingan harga jual properti dengan        the comparison of the property selling
            pendapatan kotor tahunan properti              price with the property gross annual
            tersebut    tanpa     mempertimbangkan         income without considering cost factors
            faktor-faktor biaya seperti utilitas, pajak,   such as utilities, taxes, maintenance, and
            pemeliharaan, dan tingkat kekosongan.          vacancy rates.

            Harga jual properti adalah harga properti      The sale price of the property is the price
            komersial yang berasal dari data               of the commercial property derived from
            penawaran penjualan properti komersial         sales bid data of similar commercial
            sejenis, yang memiliki karakteristik yang      property, which have the same
            sama      dengan     Obyek     Penilaian,      characteristics as the Object of
            sedangkan pendapatan kotor tahunan             Valuation, while the gross annual income
            adalah indikasi pendapatan sewa tahunan        is estimated annual rental income from
            dari Obyek Penilaian tanpa dikurangi           the Object of Valuation without
            dengan biaya apapun. Untuk menghitung          deducting any costs. To calculate the
            pendapatan     kotor    tahunan,     kami      gross annual income, we refer to the
            mengacu pada data pasar penawaran              market data of office building rental bids
            sewa properti komersial yang berlaku           prevailing on the valuation date.
            saat tanggal penilaian.

            Selanjutnya, dari hasil perhitungan            Furthermore, from the calculation
            diperoleh rata-rata GIM adalah sebesar         results, the average GIM is 33 times.
            33 kali.

            Rata-rata GIM yang diperoleh tersebut          The average GIM obtained is used to
            digunakan untuk menentukan nilai pasar         determine the market value of the Object
            Obyek Penilaian.                               of Valuation.




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                             D.7
Page 51
            PENILAIAN                                                                                 VALUATION

            Dari perhitungan dengan menggunakan                                                       From the calculation using the income
            pendekatan pendapatan, diperoleh hasil                                                    approach, the market value of the Object
            bahwa nilai pasar Obyek Penilaian                                                         of Valuation is Rp 421,945,000,000.00
            adalah sebesar Rp 421.945.000.000,00                                                      The calculation summary of the Object
            dengan ringkasan perhitungan sebagai                                                      Valuation is as follows:
            berikut:
                                                                                                    Harga Sewa Setelah              Harga
                                                                                                                                                     Gross Income
             No.                                  Lokasi/Location                                 Diskon/Rent Price After     Penawaran Jual/Price
                                                                                                                                                     Muliplier (GIM)
                                                                                                     Discount (Rp/Th)              Sell Offer

              1    Jl. Raya Alternatif Cibubur                                                                127.500.000            4.044.000.000                 32
              2    Jl. Raya Alternatif Cibubur                                                                136.000.000            4.044.000.000                 30
              3    Jl. Raya Alternatif Cibubur                                                                140.250.000            5.393.000.000                 38
             Rata-Rata GIM                                                                                                                                         33
             Analisa Penentuan Indikasi Nilai Pasar Obyek Penilaian/Analysis of Determination
             of Market Value Indication of Object of Valuation
              Luas Tanah/Land Area (m²)                                                                            20.919                                      20.919
              Luas Bangunan/Buildings Area (m²)                                                                    21.743                                      21.743
              Harga Sewa Rata-Rata/Average Rent Price (Rp/m²/Tahun)                                               582.730                                     582.730
              Indikasi Pendapatan Kotor Obyek Penilaian/
              Potential Gross Income Indication of the Object of Valuation (Rp/Tahun)                      12.670.298.390                             12.670.298.390
              GIM                                                                                                      33                                         33
              Indikasi Nilai Pasar Obyek Penilaian dengan Metode GIM/
              Indication of Market Value of Object of Valuation with GIM Method                           421.945.027.269                            421.945.027.269
              Indikasi Nilai Pasar Obyek Penilaian/
              Indication of Market Value of the Object of Valuation (Dibulatkan/Round )                   421.945.000.000                            421.945.000.000




      D.2    REKONSILIASI                                                                  D.2         RECONCILIATION

            Untuk mendapatkan nilai pasar dari                                                        To obtain the market value of the Object
            Obyek Penilaian yang merupakan hasil                                                      of Valuation which represents the
            gabungan dari dua pendekatan penilaian                                                    combined result of the two valuation
            yang digunakan, kami merekonsiliasi                                                       approaches used, we reconciled the value
            nilai yang dihasilkan dari masing-masing                                                  resulting from each approach by
            pendekatan        dengan      melakukan                                                   weighting the indicative market value of
            pembobotan nilai pasar indikatif dari                                                     the Object of Valuation obtained from
            Obyek Penilaian yang diperoleh dari                                                       both approaches. We used a 40.00%
            kedua pendekatan tersebut. Kami                                                           weight for the income approach with the
            menggunakan bobot 40,00% untuk                                                            GIM method and 60.00% for the cost
            pendekatan pendapatan dengan metode                                                       approach.
            GIM dan 60,00% untuk pendekatan
            biaya.

            Berdasarkan hasil rekonsiliasi, nilai                                                     Based on the reconciliation, the market
            pasar Obyek Penilaian adalah sebesar                                                      value of the Object of Valuation is
            Rp 420.381.460.000,00          dengan                                                     amounting to Rp 420,381,460,000.00
            perhitungan sebagai berikut                                                               with the calculation as follows:

                                                                                                                                (Rp Ribu/Million )
                                                                                         Indikasi Nilai                          Nilai Pasar
                                                                                                               Bobot/
                                                 Uraian/Description                    Pasar/Indication                     Tertimbang/Weighte
                                                                                                               Weight
                                                                                        Market Value                          d Market Value

                                 Pendekatan Pendapatan/Income Approach                          421.945.000    40,00%                168.778.000
                                 Pendekatan Biaya/Cost Approach                                 419.339.100    60,00%                251.603.460

                                 Total                                                          841.284.100 100,00%                   420.381.460




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                                                                        D.8
Page 52
            Rincian nilai pasar Obyek Penilaian                                The market value of the Object of
            dapat dilihat pada tabel berikut:                                  Valuation is detailed as follows:


                                                                    Biaya Pengganti   Penyusutan/    Nilai Pasar/
                         No.           Uraian/Description          Baru/Replacement Depreciation    Market Value
                                                                   Cost New (Rp Ribu)     (%)         (Rp Ribu)

                          1. Tanah/Land                                  330.520.200     0,00%         330.520.200
                          2. Bangunan/Buildings                          111.356.900    19,84%          89.266.865
                          3. Sarana Pelengkap Lainnya/                     1.468.700    59,53%             594.395
                             Other Land Improvements
                               Total                                                                   420.381.460




      D.3 KESIMPULAN PENILAIAN                                          D.3 VALUATION CONCLUSION

            Berdasarkan hal-hal di atas dan faktor-                            Based on the foregoing and other factors
            faktor yang erat hubungannya dengan                                relevant to the valuation, it is our opinion
            penilaian, kami berkesimpulan bahwa:                               that:

                                                            Rp 420.381.460.000,00

            ( EMPAT RATUS DUA PULUH MILIAR TIGA RATUS DELAPAN PULUH SATU
              JUTA EMPAT RATUS ENAM PULUH RIBU RUPIAH / FOUR HUNDRED AND
              TWENTY BILLION THREE HUNDRED AND EIGHTY-ONE MILLION FOUR
              HUNDRED AND SIXTY THOUSAND RUPIAH )

            merupakan nilai pasar              dari       Obyek                represents the market value of the Object
            Penilaian        pada                        tanggal               of Valuation as of December 31, 2022.
            31 Desember 2022.




                                                  ********************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                                D.9
Page 53
      E.    URAIAN OBYEK PENILAIAN/DESCRIPTION OF THE OBJECT OF VALUATION


      -     TANAH                                         -   LAND

            Obyek Penilaian adalah tanah yang                 The Object of Valuation is a land which
            berdiri di atas sebidang tanah dengan             is built on a parcel of land with 8 (eight)
            8 (delapan) buah dokumen kepemilikan.             ownership documents.

            Deskripsi tanah tersebut dapat dilihat            Description of the land is as follows:
            dalam uraian berikut:


            LETAK DAN IDENTIFIKASI                            LOCATION AND IDENTIFICATION

            Tanah dalam penilaian adalah sebidang             The land valuation is a parcel of land
            tanah yang terletak di Propinsi Jawa              located at Propinsi Jawa Barat, Kota
            Barat,     Kota     Bekasi,   Kecamatan           Bekasi,      Kecamatan     Jatisampurna,
            Jatisampurna, Kelurahan Jatirangga dan            Kelurahan Jatirangga and identified as
            dapat       diidentifikasikan    sebagai          Jl. Alternatif Cibubur Km 14.
            Jl. Alternatif Cibubur Km 14.


            DATA TANAH                                        DATA OF LAND

            Tanah tersebut dilengkapi dengan                  The land is covered with 8 (eight)
            8 (delapan) buah dokumen kepemilikan              ownership documents as follows:
            sebagai berikut:

            1. SHM No. 00322 yang diterbitkan di              1. SHM No. 00322 issued in Bekasi,
               Bekasi pada tanggal 5 Desember                    dated December 5, 2005, registered
               2005, terakhir tercatat atas nama                 on the name of Budyanto Totong,
               Budyanto Totong, dengan Surat                     and     Letter   of    Measurement
               Ukur    No.      661/Jatirangga/2005              No. 661/Jatirangga/2005,      dated
               tanggal 15November 2005, di                      November 15, 2005, at Kelurahan
               Kelurahan Jatirangga, Kecamatan                   Jatirangga, Kecamatan Jatisampurna,
               Jatisampurna, Kota Bekasi, Propinsi               Kota Bekasi, Propinsi Jawa Barat for
               Jawa Barat, luas 1.190,00 m².                     1,190.00 m² area of land,

            2. SHM No. 00335 yang diterbitkan di              2. SHM No. 00335 issued in Bekasi,
               Bekasi pada tanggal 3 April 2006,                 dated April 3, 2006, registered on the
               terakhir tercatat atas nama Budyanto              name of Budyanto Totong, and
               Totong,      dengan      Surat   Ukur             Letter        of        Measurement
               No. 673/Jatirangga/2006        tanggal            No. 673/Jatirangga/2006,         dated
               9Maret     2006,      di   Kelurahan             March 9, 2006, at Kelurahan
               Jatirangga, Kecamatan Jatisampurna,               Jatirangga, Kecamatan Jatisampurna,
               Kota Bekasi, Propinsi Jawa Barat,                 Kota Bekasi, Propinsi Jawa Barat for
               luas 500,00 m².                                   500.00 m² area of land.

            3. SHM No. 00739 yang diterbitkan di              3. SHM No. 00739 issued in Bekasi,
               Bekasi pada tanggal 27 Juli 2011,                 dated July 27, 2011, registered on
               terakhir tercatat atas nama Budyanto              the name of Budyanto Totong, and
               Totong,      dengan     Surat   Ukur              Letter        of       Measurement
               No. 22/Jatirangga/2010        tanggal             No. 22/Jatirangga/2010,       dated

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                                E.1
Page 54
                27Oktober 2010, di Kelurahan                 October 27, 2010, at Kelurahan
                Jatirangga, Kecamatan Jatisampurna,           Jatirangga, Kecamatan Jatisampurna,
                Kota Bekasi, Propinsi Jawa Barat,             Kota Bekasi, Propinsi Jawa Barat for
                luas 1.068,00 m².                             1,068.00 m² area of land.

            4. SHM No. 01576 yang diterbitkan di          4. SHM No. 01576 issued in Bekasi,
               Bekasi          pada        tanggal           dated August 29, 2012, registered on
               29 Agustus 2012, terakhir tercatat            the name of Budyanto Totong, and
               atas nama Budyanto Totong, dengan             Letter        of        Measurement
               Surat Ukur No. 66/Jatirangga/2012             No. 66/Jatirangga/2012, dated July
               tanggal 16 Juli 2012, di Kelurahan            16, 2012, at Kelurahan Jatirangga,
               Jatirangga, Kecamatan Jatisampurna,           Kecamatan Jatisampurna, Kota
               Kota Bekasi, Propinsi Jawa Barat,             Bekasi, Propinsi Jawa Barat for
               luas 181,00 m².                               181.00 m² area of land.

            5. SHM No. 01607 yang diterbitkan di          5. SHM No. 01607 issued in Bekasi,
               Bekasi          pada         tanggal          dated February 4, 2013, registered on
               4 Februari 2013, terakhir tercatat            the name of Budyanto Totong, and
               atas nama Budyanto Totong, dengan             Letter        of        Measurement
               Surat Ukur No. 1/Jatirangga/2013              No. 1/Jatirangga/2013, dated January
               tanggal 7Januari 2013, di Kelurahan          7, 2013, at Kelurahan Jatirangga,
               Jatirangga, Kecamatan Jatisampurna,           Kecamatan Jatisampurna, Kota
               Kota Bekasi, Propinsi Jawa Barat,             Bekasi, Propinsi Jawa Barat for
               luas 451,00 m².                               451.00 m² area of land.

            6. SHM No. 01661 yang diterbitkan di          6. SHM No. 01661 issued in Bekasi,
               Bekasi pada tanggal 12 Desember               dated December 12, 2012, registered
               2012, terakhir tercatat atas nama             on the name of Budyanto Totong,
               Budyanto Totong, dengan Surat                 and     Letter   of    Measurement
               Ukur No. 67/Jatirangga/2013 tanggal           No. 67/Jatirangga/2013,       dated
               10September 2013, di Kelurahan               September 10, 2013, at Kelurahan
               Jatirangga, Kecamatan Jatisampurna,           Jatirangga, Kecamatan Jatisampurna,
               Kota Bekasi, Propinsi Jawa Barat,             Kota Bekasi, Propinsi Jawa Barat for
               luas 1.695,00 m².                             1,695.00 m² area of land.

            7. SHM No. 01682 yang diterbitkan di          7. SHM No. 01682 issued in Bekasi,
               Bekasi pada tanggal 24 Januari                dated January 24, 2005, registered on
               2005, terakhir tercatat atas nama             the name of Budyanto Totong, and
               Budyanto Totong, dengan Surat                 Letter       of         Measurement
               Ukur        No. 2999/Jatikarya/2005           No. 2999/Jatikarya/2005,        dated
               tanggal 7Januari 2005, di Kelurahan          January 7, 2005, at Kelurahan
               Jatikarya, Kecamatan Jatisampurna,            Jatikarya, Kecamatan Jatisampurna,
               Kota Bekasi, Propinsi Jawa Barat,             Kota Bekasi, Propinsi Jawa Barat for
               luas 604,00 m²; dan                           604.00 m² area of land; and

            8. SHM No. 02364 yang diterbitkan di          8. SHM No. 02364 issued in Bekasi,
               Bekasi pada tanggal 27 Desember               dated December 27, 2004, registered
               2004, terakhir tercatat atas nama             on the name of Budyanto Totong,
               Budyanto Totong, dengan Surat                 and    Letter    of    Measurement
               Ukur       No. 806/2017     tanggal           No. 806/2017, dated September 22,
               22September 2017, di Kelurahan               2017, at Kelurahan Jatikarya,
               Jatikarya, Kecamatan Jatisampurna,            Kecamatan Jatisampurna, Kota
               Kota Bekasi, Propinsi Jawa Barat,             Bekasi, Propinsi Jawa Barat for
                                                             15,230.00 m² area of land.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                       E.2
Page 55
                luas 15.230,00 m².

            Total luas tanah berdasarkan dokumen          Total land area in accordance with the
            tersebut adalah 20.919,00 m².                 documents is 20,919.00 m².


            ANALISIS LINGKUNGAN                           NEIGHBORHOOD ANALYSIS

            Lokasi tanah terletak di kawasan              The land is located at mixed use area,
            campuran yang merupakan daerah bebas          which is free of flood.
            banjir.

            Daerah tersebut mudah dicapai dari            The site can be reached from Jagorawi
            Jl. Tol Jagorawi ke arah selatan, keluar      Toll Road heading to the south and than
            di Gerbang Tol Cibubur, pada pertigaan        exit Cibubur Toll Gate, at the T-junction
            Jl. Alternatif Cibubur membelok ke arah       with Jl. Alternatif Cibubur to the south
            selatan ± 4 km menuju lokasi yang             leading the location with a distance of
            dimaksud.                                     ± 4 km.

            Di sekitarnya pada umumnya adalah             In general, the surroundings are
            bangunan rumah toko (ruko), rumah             shophouses, hospital, residential houses
            sakit, perumahan dan mall dengan              and mall in good condition and
            kondisi rata-rata baik dan bersifat           permanent building.
            permanen.

            Di sebelah barat daya dari lokasi dengan      In the southwest with a radius of ± 600 m
            radius ± 600 m terdapat Mall Ciputra         from the location lies Mall Ciputra
            Cibubur, di sebelah tenggara dengan           Cibubur, in the Southeast side with a
            radius ± 350 m dari lokasi terdapat          radius of ± 350 m from the location lies
            Perumahan       CitraGrand       Cibubur,     CitraGrand Cibubur Residential, whereas
            sedangkan pusat kota Bekasi terletak di       the city center of Kota Bekasi lies in the
            sebelah timur laut dengan jarak ± 34 km.     northeast side within a distance of
                                                          ± 34 km from the location.

            Kami juga mengidentifikasi sisi positif       We also identified the positive side of the
            dari lokasi Obyek Penilaian, yaitu Obyek      location of the Object of Valuation,
            Penilaian dekat dengan pusat keramaian        namely the Object of Valuation is close
            dan mudah dijangkau dari jalan tol.           to the center of the crowd and easily
                                                          accessible from the toll road.


            ANALISIS SITE                                 SITE ANALYSIS

            Lokasi tanah di sisi sebelah utara dari       Location of the land is in the north of
            Jl. Alternatif Cibubur.                       Jl. Alternatif Cibubur.

            Bentuk tanah tidak beraturan dengan           The land is irregular shape with a
            ukuran lebar depan yang sejajar dengan        frontage of ± 103 m and a maximum
            jalan di depan lokasi ± 103 m dan            depth of ± 114 m.
            panjang ke belakang maksimum
            ± 114 m.




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          E.3
Page 56
            Kontur tanah pada umumnya datar               Contour of the land is generally flat with
            dengan ketinggian kurang lebih sama           the same elevation than the road in front
            dengan permukaan jalan di depan lokasi.       of location.

            Sifat tanah pada umumnya adalah tanah         In general, land condition is hard.
            keras.

            Di atas tanah telah ada bangunan              There is Mitra 10 Cibubur Supermarket
            Supermarket Mitra 10 Cibubur.                 building already on the ground.

            Batas-batas tanah adalah sebagai berikut:     The land boundaries are as follows:

            - Sebelah utara   : Tanah kosong.             - North            : Vacand land.
            - Sebelah timur   : Yayasan                   - East             : Yayasan
                                Radhasoami                                     Radhasoami
                                Satsang Beas                                   Satsang Beas
                                Indonesia.                                     Indonesia.
            - Sebelah selatan : Jl. Alternatif            - South            : Jl. Alternatif
                                Cibubur.                                       Cibubur.
            - Sebelah barat : Pemukiman dan               - West             : Vacant land and
                                tanah kosong.                                  residential.

            Perkerasan jalan di depan lokasi              The road in front of the location
            (Jl. Alternatif Cibubur) pada umumnya         (Jl. Alternatif Cibubur) is generally
            terbuat dari aspal hotmix dengan lebar        hardened with aspalt hotmix ± 22 m
            ± 22 m dilengkapi dengan saluran air         wide, completed with closed sewerage,
            tertutup, jalur hijau, median jalan,          green belt, road divide, sidewalk, and
            trotoar, dan lampu penerangan jalan           street lighting.
            umum.

            Lokasi tersebut dapat dicapai dari arah       The location can be reached from the
            barat laut melalui jalan tol Jagorawi –       west route, through Jagorawi toll road –
            Gerbang Tol Cibubur – Jl. Alternatif          Cibubur Toll Gate – Jl. Alternatif
            Cibubur.                                      Cibubur.


            PERENCANAAN KOTA                              URBAN PLANNING

            Berdasarkan informasi rencana tata kota       Based on information of urban planning
            yang kami terima dari manajemen               which received from the management of
            Perseroan, lokasi Obyek Penilaian             the Company, the Object of Valuation is
            terletak di areal yang memiliki               located in an area designated for mixed
            peruntukan sebagai kawasan campuran.          area.


            FASILITAS LINGKUNGAN                          NEIGHBORHOOD FACILITY

            Lalu     lintas   umum      terdapat   di     Public transportation goes along
            Jl. Alternatif Cibubur, yang merupakan        Jl. Alternatif Cibubur, which is the main
            lalu lintas utama di daerah tersebut yang     road in the area and situated in the front
            terletak di depan lokasi dan merupakan        of the location and is a two-way traffic
            lalu lintas dua arah dari barat ke timur      from west to east and the other way
            dan sebaliknya dengan intensitas              around with a high traffic intensity.
            pemakaian yang tinggi.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          E.4
Page 57
            Perkerasan jalan terbuat dari aspal           The road is hardened with asphalt hotmix
            hotmix dengan lebar ± 22 m dan               ± 22 m wide, completed with close
            dilengkapi dengan saluran air tertutup        sewerage and road lighting.
            dan lampu penerangan jalan.

            Di daerah tersebut telah tersedia fasilitas   Electricity from PT PLN (Persero), clear
            listrik dari PT PLN (Persero), air bersih     water from PDAM, and telephone line
            dari PDAM, dan telepon dari PT Telkom         from PT Telkom (Persero) Tbk are
            (Persero) Tbk, yang semuanya telah            available in the area and connected to the
            disambungkan ke lokasi, serta fasilitas       location, and public transport facility.
            transportasi umum, dan lain-lain.


            PENGGUNAAN TERTINGGI DAN                      ZONING, HIGHEST AND BEST USE
            TERBAIK

            Pemanfaatan tertinggi dan terbaik             The highest and best use, based on the
            (highest and best use atau HBU)               KEPI & SPI, is defined as “the most
            berdasarkan KEPI & SPI didefinisikan          probable use of a property which
            sebagai “penggunaan yang paling               physically      possible,    appropriately
            mungkin dan optimal dari suatu aset,          justified, legally permissible, financially
            yang secara fisik dimungkinkan, telah         feasible, and which results in the highest
            dipertimbangkan secara memadai, secara        value of the property being valued”
            hukum diizinkan, secara finansial layak,      (KEPI & SPI –KPUP 10.1).
            dan menghasilkan nilai tertinggi dari aset
            tersebut” (KEPI & SPI –KPUP 10.1).

            Analisis pemanfaatan tertinggi dan            Analysis of the highest and best use of
            terbaik atas tanah dengan kondisi saat ini    land (as improved) is as follows:
            (as improved) adalah sebagai berikut:

            - Penggunaan Secara Hukum                     - Legal Aspect

               Berdasarkan sertifikat kepemilikan            Based on land ownership certificates,
               tanah, lokasi Obyek Penilaian terletak        the Object of Valuation is located in
               di areal yang memiliki peruntukan             an area designated for vertical
               sebagai kawasan hunian vertikal.              residential area. The current use of the
               Dengan demikian, Obyek Penilaian              Object of Valuation already fulfills
               telah sesuai dengan peruntukan dan            and/or the existing regulations.
               atau peraturan yang berlaku.

            - Penggunaan Secara Fisik                     - Physical Use

               Dengan memperhatikan tanah seluas             Considering that the land area is
               20.919,00 m² dan bangunan seluas              20,919.00 m² and buildings area is
               22.070,00 m², maka Obyek Penilaian            22,070.00 m², the Object of Valuation
               telah memenuhi penggunaan yang                is physically feasible for a commercial
               layak secara fisik sebagai kawasan            use.
               komersial.

            - Penggunaan Secara Finansial                 - Financial Aspect

               Obyek Penilaian adalah supermarket            The Object of Valuation is a
               yang   memiliki    potensi   untuk            supermarket which has potential to

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          E.5
Page 58
               menghasilkan pendapatan.                          generate income.

            - Penggunaan         Berdasarkan       Nilai      - The Highest Value
              Tertinggi

               Dengan memperhatikan lokasi sekitar,              Considering the surrounding location,
               situasi pasar, dan pengembangan di                market      situation,     and  land
               sekelilingnya,                  maka              development in the surrounding area,
               penggunaan/pemanfaatan         Obyek              the usage of the Object of Valuation
               Penilaian sebagai supermarket saat ini            for a supermarket is estimated to
               diperkirakan memberikan nilai yang                provide the highest value.
               tertinggi.

            Mengingat uraian-uraian di atas dan               Based on the analysis above and
            memperhatikan penggunaan tanah di                 considering the use of surrounding area,
            sekitarnya, maka menurut hemat kami               we are of the opinion that the usage for
            penggunaan/pemanfaatan tanah sebagai              supermarket represents the highest and
            supermarket diperkirakan merupakan                best use of the land.
            penggunaan/pemanfaatan yang tertinggi
            dan terbaik dari tanah tersebut.



      E.2 BANGUNAN                                         E.2 BUILDINGS

            OUTLET MITRA 10                                   OUTLET MITRA 10

            Tipe bangunan : Supermarket.                      Type of building : Supermarket.

            Jumlah lantai     : 3 (tiga).                     Number of story : 3 (three).

            Konstruksi
            bangunan          : Rangka baja dan               Construction     : Steel frames and
                                beton bertulang.                                 reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:              Materials used for:

            - Pondasi         : Rangka baja dan               - Foundation     : Steel frames and
                                beton bertulang.                                 reinforced concrete.

            - Dinding
              pengisi         : Pasangan batu bata.           - Wall           : Brick masonry.

            - Konstruksi                                      - Roof
              atap            : Rangka baja.                    structure      : Steel frames.

            Lantai            : Keramik.                      Floor            : Ceramic tiles.

            Dinding           : Pasangan bata ringan          Wall             : Plastered and painted
                                diplester dan dicat.                             light brick masonry.

            Kusen, pintu,                                     Frame, door,
            dan jendela       : Alumunium, pintu              and window       : Alumunium,       glass
                                kaca dengan rangka                               doors            with

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                            E.6
Page 59
                                 alumunium, jendela                             alumunium frames,
                                 kaca dengan rangka                             and glass windows
                                 alumunium.                                     with     alumunium
                                                                                frames.

            Langit-langit     : Gypsumboard.              Ceiling          : Gypsumboard.

            Penutup atap      : Alderon.                  Roof             : Alderon roof.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

                                 - Sumber air bersih                            - The source of
                                   dari PDAM yang                                 clean water is
                                   disalurkan                                     obtained      from
                                   menggunakan                                    PDAM which is
                                   pompa listrik.                                 distributed using
                                                                                  an electric pump.

                                 - Jaringan                                     - Connected
                                   telekomunikasi                                 telephone      line
                                   dari PT Telkom                                 from PT Telkom
                                   (Persero) Tbk.                                 (Persero) Tbk.
            Luas bangunan
            efektif       : 17.695,00 m².                 Effective area   : 17,695.00 m².

            Kondisi*)         : Baik.                     Condition *)     : Good.


            GUDANG DAN RISEFLOOR                          WAREHOUSE AND RISEFLOOR

            Tipe bangunan : Gudang.                       Type of building : Warehouse.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).

            Konstruksi
            bangunan          : Rangka baja dan           Construction     : Steel frames and
                                beton bertulang.                             Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Ranka baja dan            - Foundation     : Steel frames and
                                Beton bertulang.                             Reinforced concrete.

            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.

            - Konstruksi                                  - Roof
              atap            : Rangka baja.                structure      : Steel frames.

            Lantai            : Beton bertulang.          Floor            : Reinforced concrete.

            Dinding           : Batu bata diplester       Wall             : Painted brick masonry.
                                dan dicat.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          E.7
Page 60
            Kusen, pintu,                                 Frame, door,
            dan jendela       : Baja, pintu plat baja     and window       : Steel, steel plate
                                dengan rangka baja,                          doors with steel
                                dan jendela kaca                             frames, and glass
                                dengan        rangka                         windows       with
                                alumunium.                                   alumunium frames.

            Langit-langit     : -                         Ceiling          : -

            Penutup atap      : Spandek.                  Roof             : Spandex roof.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

                                 - Sumber air bersih                            - The source of
                                   dari PDAM yang                                 clean water is
                                   disalurkan                                     obtained      from
                                   menggunakan                                    PDAM which is
                                   pompa listrik.                                 distributed using
                                                                                  an electric pump.

                                 - Jaringan                                     - Connected
                                   telekomunikasi                                 telephone      line
                                   dari PT Telkom                                 from PT Telkom
                                   (Persero) Tbk.                                 (Persero) Tbk.

            Luas bangunan
            efektif       : 4.048,00 m².                  Effective area   : 4,048.00 m².

            Kondisi*)         : Baik.                     Condition *)     : Good.


            POS JAGA                                      GUARD POST

            Tipe bangunan : Pos jaga.                     Type of building : Guard post.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).

            Konstruksi
            bangunan          : Beton bertulang.          Construction     : Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Beton bertulang.          - Foundation     : Reinforced concrete.
            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.
            - Konstruksi                                  - Roof
              atap            : Rangka kayu.                structure      : Wooden frames.

            Lantai            : Keramik.                  Floor            : Ceramic tiles.

            Dinding           : Batu bata diplester       Wall             : Painted brick
                                dan dicat.                                   masonry.


Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          E.8
Page 61
            Kusen, pintu,                                 Frame, door,
            dan jendela       : Kayu, pintu kayu          and window       : Wooden        frames,
                                dengan rangka kayu,                          wooden doors with
                                serta jendela kaca                           wooden frames, and
                                dengan rangka kayu.                          partly glass windows
                                                                             with wooden frames.

            Langit-langit     : Gysumboard                Ceiling          : Gypsumboard

            Penutup atap      : Genteng tanah liat.       Roof             : Clay roof.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

                                 - Sumber air bersih                            - The source of
                                   dari PDAM yang                                 clean water is
                                   disalurkan                                     obtained      from
                                   menggunakan                                    PDAM which is
                                   pompa listrik.                                 distributed using
                                                                                  an electric pump.

            Luas bangunan
            efektif       : 30,00 m².                     Effective area   : 30.00 m².

            Kondisi*)         : Cukup.                    Condition *)     : Average.


            RUMAH CONTROL ROOM                            CONTROL ROOM HOUSE

            Tipe bangunan : Gudang.                       Type of building : Warehouse.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).

            Konstruksi
            bangunan          : Beton bertulang.          Construction     : Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Beton bertulang.          - Foundation     : Reinforced concrete.
            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.

            - Konstruksi                                  - Roof
              atap            : Rangka baja.                structure      : Steel frames.

            Lantai            : Beton bertulang.          Floor            : Reinforced concrete.

            Dinding           : Batu bata diplester       Wall             : Painted brick
                                dan dicat.                                   masonry.

            Kusen, pintu,                                 Frame, door,
            dan jendela       : Baja, pintu plat baja     and window       : Steel, steel      plate
                                dengan rangka baja.                          doors with        steel
                                                                             frames.

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                          E.9
Page 62
            Langit-langit     : -                         Ceiling          : -

            Penutup atap      : Beton bertulang.          Roof             : Reinforced concrete.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

            Luas bangunan
            efektif       : 27,00 m².                     Effective area   : 27.00 m².

            Kondisi*)         : Cukup.                    Condition *)     : Average.


            RUMAH GENSET                                  GENERATOR HOUSE

            Tipe bangunan : Gudang.                       Type of building : Warehouse.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).


            Konstruksi
            bangunan          : Beton bertulang.          Construction     : Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Beton bertulang.          - Foundation     : Reinforced concrete.
            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.

            - Konstruksi                                  - Roof
              atap            : Rangka baja.                structure      : Steel frames.

            Lantai            : Beton bertulang.          Floor            : Reinforced concrete.

            Dinding           : Batu bata diplester       Wall             : Painted brick
                                dan dicat.                                   masonry.

            Kusen, pintu,                                 Frame, door,
            dan jendela       : Baja, pintu plat baja     and window       : Steel, steel     plate
                                dengan rangka baja.                          doors with       steel
                                                                             frames.
            Langit-langit     : -                         Ceiling          : -

            Penutup atap      : Beton bertulang.          Roof             : Reinforced concrete.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

            Luas bangunan
            efektif       : 44,00 m².                     Effective area   : 44.00 m².

            Kondisi*)         : Cukup.                    Condition *)     : Average.



Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                       E.10
Page 63
            RUMAH TRAFO                                   TRAFO HOUSE

            Tipe bangunan : Gudang.                       Type of building : Warehouse.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).

            Konstruksi
            bangunan          : Beton bertulang.          Construction     : Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Beton bertulang.          - Foundation     : Reinforced concrete.
            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.

            - Konstruksi                                  - Roof
              atap            : Rangka baja.                structure      : Steel frames.

            Lantai            : Beton bertulang.          Floor            : Reinforced concrete.
            Dinding           : Batu bata diplester       Wall             : Painted brick
                                dan dicat.                                   masonry.

            Kusen, pintu,                                 Frame, door,
            dan jendela       : Baja, pintu plat baja     and window       : Steel, steel     plate
                                dengan rangka baja.                          doors with       steel
                                                                             frames.
            Langit-langit     : -                         Ceiling          : -

            Penutup atap      : Beton bertulang.          Roof             : Reinforced concrete.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

            Luas bangunan
            efektif       : 24,00 m².                     Effective area   : 24.00 m².

            Kondisi*)         : Cukup.                    Condition *)     : Average.


            MUSHOLLA                                      PRAYER ROOM

            Tipe bangunan : Musholla.                     Type of building : Prayer room.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).

            Konstruksi
            bangunan          : Beton bertulang.          Construction     : Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Beton bertulang.          - Foundation     : Reinforced concrete.
            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.
            - Konstruksi                                  - Roof

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                       E.11
Page 64
               atap           : Rangka kayu.                structure      : Wooden frames.

            Lantai            : Keramik.                  Floor            : Ceramic tiles.

            Dinding           : Pasangan batu bata.       Wall             : Painted brick
                                                                             masonry.
            Kusen, pintu,
            dan jendela       : Alumunium, pintu          Frame, door,
                                kaca dengan rangka        and window       : Alumunium,     glass
                                alumunium,      dan                          door with alumunium
                                jendela kaca dengan                          frames, and glass
                                rangka alumunium.                            window          with
                                                                             alumunium frames.

            Langit-langit     : Gypsumboard.              Ceiling          : Gypsumboard

            Penutup atap      : Genteng tanah liat.       Roof             : Clay roof.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

                                 - Sumber air bersih                            - The source of
                                   diperoleh       dari                           clean water is
                                   PDAM           yang                            obtained      from
                                   disalurkan                                     PDAM which is
                                   menggunakan                                    distributed using
                                   pompa listrik.                                 an electric pump.

            Luas bangunan
            efektif       : 96,00 m².                     Effective area   : 96.00 m².

            Kondisi*)         : Cukup.                    Condition *)     : Average.


            2 UNIT RUMAH POMPA LAMA                       2 UNIT OLD WATERPUMP HOUSE

            Tipe bangunan : Gudang.                       Type of building : Warehouse.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).

            Konstruksi
            bangunan          : Beton bertulang.          Construction     : Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Beton bertulang.          - Foundation     : Reinforced concrete.
            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.

            - Konstruksi                                  - Roof
              atap            : Rangka baja.                structure      : Steel frames.

            Lantai            : Beton bertulang.          Floor            : Reinforced concrete.
            Dinding           : Batu bata diplester       Wall             : Painted brick

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                        E.12
Page 65
                                 dan dicat.                                     masonry.

            Kusen, pintu,                                 Frame, door,
            dan jendela       : Baja, pintu plat baja     and window       : Steel, steel     plate
                                dengan rangka baja.                          doors with       steel
                                                                             frames.
            Langit-langit     : -                         Ceiling          : -

            Penutup atap      : Beton bertulang.          Roof             : Reinforced concrete.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).

            Luas bangunan
            efektif       : @25,00 m².                    Effective area   : @25.00 m².

            Kondisi*)         : Cukup.                    Condition *)     : Average.


            RUMAH GENSET LAMA                             OLD GENARATOR HOUSE

            Tipe bangunan : Gudang.                       Type of building : Warehouse.

            Jumlah lantai     : 1 (satu).                 Number of story : 1 (one).

            Konstruksi
            bangunan          : Beton bertulang.          Construction     : Reinforced concrete.

            Bahan-bahan yang dipergunakan untuk:          Materials used for:

            - Pondasi         : Beton bertulang.          - Foundation     : Reinforced concrete.
            - Dinding
              pengisi         : Pasangan batu bata.       - Wall           : Brick masonry.

            - Konstruksi                                  - Roof
              atap            : Rangka baja.                structure      : Steel frames.

            Lantai            : Beton bertulang.          Floor            : Reinforced concrete.
            Dinding           : Batu bata diplester       Wall             : Painted brick
                                dan dicat.                                   masonry.

            Kusen, pintu,                                 Frame, door,
            dan jendela       : Baja, pintu plat baja     and window       : Steel, steel     plate
                                dengan rangka baja.                          doors with       steel
                                                                             frames.
            Langit-langit     : -                         Ceiling          : -

            Penutup atap      : Beton bertulang.          Roof             : Reinforced concrete.

            Fasilitas lainnya : - Daya listrik dari       Other facilities : - Electricity from
                                  PT PLN (Persero).                            PT PLN (Persero).




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                       E.13
Page 66
            Luas bangunan
            efektif       : 56,00 m².                        Effective area   : 56.00 m².

            Kondisi*)         : Cukup.                       Condition *)     : Average.


      E.3 SARANA PELENGKAP LAINNYA                        E.3 OTHER LAND IMPROVEMENTS

            PAGAR KELILING                                   PARIMETER FENCE

            Tipe bangunan : Pasangan        panel            Type of building : Concrete panel pair
                            beton         dengan                                with       reinforced
                            konstruksi batu kali                                concrete
                            dan beton bertulang.                                construction,
                                                                                riverstone masonry
                                                                                foundation.

            Luas efektif      : 556,00 m.                   Effective area   : 556.00 m.

            Kondisi*)         : Sedang.                      Condition *)     : Fair.


            PERKERASAN HALAMAN                               COURTYARD PAVEMENT

            Tipe bangunan : Beton bertulang dan              Type of building : Reinforced concrete
                            sebagian pasangan                                   construction,  and
                            paving block.                                       partly with paving
                                                                                block.

            Luas efektif      : 8.011,80 m².                 Effective area   : 8,011.80 m².

            Kondisi*)         : Sedang.                      Condition *)     : Fair.



            *) Keterangan:                                   *) Remarks:
                Sangat baik :      90%–100%                      Very good     :   90%–100%
                Baik         :     70%–89%                       Good          :   70%–89%
                Cukup        :     50%–69%                       Average       :   50%–69%
                Sedang       :     30%–49%                       Fair          :   30%–49%
                Buruk        :     10%–29%                       Poor          :   10%–29%
                Sangat buruk :     0%–9%                         Very poor     :   0%–9%




                                              ******************




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong                                         E.14
Page 67
                                         LAMPIRAN/APPENDICES




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 68
                                         LAMPIRAN I/APPENDIX I

                              FOTO-FOTO OBYEK PENILAIAN/
                         PHOTOGRAPH OF THE OBJECT OF VALUATION




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 69
                                      FOTO-FOTO OBYEK PENILAIAN DI/
                             PHOTOGRAPH OF THE OBJECT OF VALUATION AT
                                       JL. ALTERNATIF CIBUBUR KM 14
                                           KELURAHAN JATIRANGGA
                                         KECAMATAN JATISAMPURNA
                                                   KOTA BEKASI
                                             PROPINSI JAWA BARAT




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 70
                         JALAN DI DEPAN LOKASI (JL. ALTERNATIF CIBUBUR)
                                       DARI ARAH BARAT/
                       ROAD IN FRONT OF LOCATION (JL. ALTERNATIF CIBUBUR)
                                   TAKEN FROM WEST DIRECTION




                         JALAN DI DEPAN LOKASI (JL. ALTERNATIF CIBUBUR)
                                       DARI ARAH TIMUR/
                       ROAD IN FRONT OF LOCATION (JL. ALTERNATIF CIBUBUR)
                                   TAKEN FROM EAST DIRECTION

Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 71
                             TAMPAK BAGIAN DEPAN OBYEK PENILAIAN
                         FRONT VIEW SITUATION OF THE OBJECT OF VALUATION




                                                 OUTLET MITRA10




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 72
                          TAMPAK SITUASI BAGIAN DALAM OBYEK PENILAIAN
                             INSIDE VIEW OF THE OBJECT OF VALUATION




                                     TAMPAK SITUASI BAGIAN LANTAI 1
                                        INSIDE VIEW OF 1ST FLOOR




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 73
                                     TAMPAK SITUASI BAGIAN LANTAI 2
                                        INSIDE VIEW OF 2 nd FLOOR




                                     TAMPAK SITUASI BAGIAN LANTAI 3
                                        INSIDE VIEW OF 3rd FLOOR




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 74
                                           TAMPAK SITUASI GUDANG
                                            WAREHOUSE SITUATION




                                                    MUSHOLLA
                                                   PRAYER ROOM




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 75
                                                  AREA PARKIR
                                                  PARKING AREA




                                                RUMAH GENSET
                                               GENERATOR HOUSE




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 76
                                      LAMPIRAN II/APPENDICES II

                         VICINITY DAN LAYOUT OBYEK PENILAIAN
                     VICINITY AND LAYOUT THE OBJECT OF VALUATION




Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 77
   Lokasi Data Pembanding/
   Location of Comparables

   Obyek Penilaian/
   the Object of Valuation di/at
   Jl. Alternatif Cibubur Km 14
   Kelurahan Jatirangga
   Kecamatan Jatisampurna                                   DATA PEMBANDING 2/
   Kota Bekasi                                                COMPARISON 2
   Propinsi Jawa Barat

                      TRANS STUDIO
                      MALL CIBUBUR

                                                            RS. MITRA
                                                                                       OBYEK PENILAIAN/
                                                            KELUARGA
                                                                                   THE OBJECT OF VALUATION




                     DATA PEMBANDING 3/
                       COMPARISON 3

                                                           PINTU TOL
                                                          JATIKARYA 2


                                                                          MALL CIPUTRA
                                                                            CIBUBUR




                                                                                         DATA PEMBANDING 1/
                                                                                           COMPARISON 1


                                                                                                              N
Penilaian Properti Milik/Atas Nama Budyanto Totong/
Valuation of Property of/on the Name of Budyanto Totong
Page 78
                                                                                                               VICINITY MAP


                                                         SHM No. 322
                                                                            2
                                                  Luas/Land Area 1.190,00 m                                       TRANS STUDIO
                                                                                                                  MALL CIBUBUR

                                                                                                                                                    RS. MITRA
                                                                                                                                                                                  OBYEK PENILAIAN/
                                                                                                                                                    KELUARGA
                                                                                                                                                                              THE OBJECT OF VALUATION


                                    SHM No. 335
                              Luas/Land Area 500,00 m 2              SH M No. 1682
                                                                Luas/Land Area 604,00 m 2                                                        PINTU TOL
                                                                                                                                                JATIKARYA 2


                                                                                                                                                                    MALL CIPUTRA
                                                                                                                                                                      CIBUBUR




                    SH M No. 1576                                                    SHM No. 1607
                                                                                                        2
               Luas/Land Area 181,00 m 2                                        Luas/Land Area 451,00 m



           SHM No. 1661
                               2
     Luas/Land Area 1.695,00 m

       SHM No. 739
Luas/Land Area 1.068,00 m 2




                                                                                       SH M No. 2364
                                                                                                           2
                                                                                Luas/Land Area 15.230,00 m




                                              JL. ALTERNATIF CIBUBUR                                            PEMBERI TUGAS/ASSIGNOR:


                                                                                                                PT CATUR SENTOSA ADIPRANA TBK

                                                                                                               GAMBAR/FIGURE 1                                SKALA/SCALE           : Not to Scale
                                                                                                               Situasi Tanah/Land Situation di/at
                                                                                                                                                           TANGGAL/DATE : March 13, 2023
                                                                                                               Jl. Alternatif Cibubur Km 14
                                                                                                               Kelurahan Jatirangga                           GBR/DRAW. NO : 230313 .002/GB/SRR
                                                                                                               Kecamatan Jatisampurna
                                                                                                                                                                DIGAMBAR/               DIPERIKSA/
                                                                                                               Kota Bekasi                                      DRAWN BY                CHECKED BY

                                                                                                               Propinsi Jawa Barat




                                                                                                                                       SUWENDHO RINALDY & REKAN
                                                                                                                                       KANTOR JASA PENILAI PUBLIK
                                                                                                                                       Nomor Izin Usaha KJPP: 2.09.0059
                                                                                                                                       Penilaian Properti dan Bisnis
Page 79
                         VICINITY MAP



                              TRANS STUDIO
                              MALL CIBUBUR

                                                                  RS. MITRA
                                                                                                  OBYEK PENILAIAN/
                                                                  KELUARGA
                                                                                              THE OBJECT OF VALUATION




                                                                 PINTU TOL
                                                                JATIKARYA 2


                                                                                    MALL CIPUTRA
                                                                                      CIBUBUR




                          DESCRIPTION:
                           1. Outlet Mitra10
                           2. Gudang & Risefloor/Warehouse & Risefloor
                           3. Pos Jaga/Guard Post
                           4. Rumah Control Room/Control Room House
                           5. Rumah Genset/Generator House
                           6. Rumah Trafo/Trafo House
                           7. Musholla/Prayer Room
                           8. Rumah Pompa Lama/Old Waterpump House
                           9. Rumah Genset Lama/Old Generator House




JL. ALTERNATIF CIBUBUR    PEMBERI TUGAS/ASSIGNOR:


                           PT CATUR SENTOSA ADIPRANA TBK

                         GAMBAR/FIGURE 2
                                                                              SKALA/SCALE           : Not to Scale
                         Situasi Bangunan/Buildings Situation di/at

                         Jl. Alternatif Cibubur Km 14                     TANGGAL/DATE : March 13, 2023
                         Kelurahan Jatirangga
                                                                              GBR/DRAW. NO : 230313 .002/GB/SRR
                         Kecamatan Jatisampurna
                                                                               DIGAMBAR/                DIPERIKSA/
                         Kota Bekasi                                           DRAWN BY                 CHECKED BY
                         Propinsi Jawa Barat




                                                      SUWENDHO RINALDY & REKAN
                                                      KANTOR JASA PENILAI PUBLIK
                                                      Nomor Izin Usaha KJPP: 2.09.0059
                                                      Penilaian Properti dan Bisnis

File

File Open PDF
Source IDX
Size1.62 MB
Published4 Jul 2023
Pages79
Characters278,361
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 0 people and organisations named in the text · linked when the evidence is strong

The name pass has not read this document yet.

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

Rule parser Needs review confidence 0.091 21058 ms 12 Sep 2026 22:10
Raw output
{'appraiser_exempt': None,
 'appraiser_name': '',
 'assets': [],
 'currency': None,
 'fact_type': '',
 'issuer_name': '',
 'kind': 'MATERIAL_FACT',
 'kjpp_name': '',
 'letter_number': '',
 'object_text': '',
 'object_truncated': False,
 'parties': [],
 'pct_of_equity': None,
 'reference_period': '',
 'requires_rups': None,
 'rups_date': None,
 'ticker': '',
 'transaction_date': None,
 'valuation_date': None,
 'value': None}
↑↓ select ↵ open ⇧↵ see every result