Skip to content
Back to announcement

20251027_KKGI_Laporan Informasi dan Fakta Material_31979823.pdf

Other Text extracted KKGI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 6

Page 1
Go To English Page

 Nomor Surat                           048/RAIN/X/C/2025

 Nama Perusahaan                       Resource Alam Indonesia Tbk

 Kode Emiten                           KKGI

 Lampiran                              1
                                       Penunjukkan PT Resource Alam Indonesia, Tbk sebagai Pemrakarsa Proyek
 Perihal
                                       PLTM Bendungan BENER yang berlokasi di Kabupaten Purworejo, Propinsi
                                       Jawa Tengah oleh Kementerian PU.


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik            Resource Alam Indonesia Tbk

 Bidang Usaha                                  Pertambangan batu bara



 Telepon                                       021-633-30-36, 021 3952-55-30 ( Hunting )

 Faksimili                                     021 - 6337006

 Alamat Surat Elektronik (email)               info@raintbk.com; investor.relations@raintbk.com


 Tanggal Kejadian                              27 Oktober 2025
 Jenis Informasi atau Fakta Material           Penunjukkan PT Resource Alam Indonesia, Tbk sebagai
                                               Pemrakarsa Proyek PLTM Bendungan BENER yang berlokasi
                                               di Kabupaten Purworejo, Propinsi Jawa Tengah oleh
                                               Kementerian PU.
Page 2
 Uraian Informasi atau Fakta Material       Bendungan Bener merupakan salah satu Proyek Strategis
                                            Nasional (PSN).
                                            A.        Fungsi utama Bendungan Bener
                                                  The main function of the Bener Dam
                                            Irigasi: Bendungan ini akan mendukung pengairan lahan
                                            pertanian seluas sekitar 15.000 hektare, terutama di wilayah
                                            Purworejo, Kebumen, dan Kulon Progo.
                                            Penyediaan air baku: PLTM Bendungan Bener akan menjadi
                                            sumber air baku untuk kebutuhan rumah tangga, kota, dan
                                            industri dengan kapasitas sekitar 1.500 liter per detik.
                                            Pengendalian banjir:
                                            Bendungan ini dirancang untuk mengurangi debit banjir.
                                            Tujuannya untuk mengurangi risiko banjir di kawasan hilir.

                                            Menghasilkan listrik: PLTM ini diproyeksikan untuk
                                            menghasilkan energi listrik sebesar 6-10 MW untuk memenuhi
                                            kebutuhan listrik di sekitar wilayah Purworejo dan sekitarnya.

                                            Pariwisata: Bendungan ini juga direncanakan menjadi
                                            destinasi wisata alam karena lokasinya yang diapit dua bukit.

                                            Perikanan: Pembangunan bendungan ini juga akan
                                            mendukung pengembangan sektor perikanan
                                                   Projek Status   :      Studi Kelayakan

                                                   Estimated Project Cost)      : IDR 96 Milyar

                                                  Rencana penjualan listrik     :        PLN UID Jawa
                                            Tengah

                                            B.        Proses yang telah dan akan berjalan
                                                 Feasibility Study (FS) atau studi kelayakan telah selesai
                                            dilaksanakan.
                                            Feasibility Study (FS) atau studi kelayakan menunggu
                                            persetujuan oleh Direktorat Jenderal Pembiayaan Infrastruktur
                                            Sumber Daya Air        (DJPI SDA) Kementrian Pekerjaan
                                            Umum. Jika sudah disetujui, maka akan dilanjutkan dengan
                                            proses DED (Detail Engineering Design).
                                            Proses selanjutnya adalah tender, yang akan diadakan oleh
                                            Kementrian PU. Karena PT Resource Alam Indonesia, Tbk
                                            (Rain Tbk) telah ditunjuk sebagai pemrakarsa proyek, maka
                                            diberikan hak right to match.
                                            Setelah proses tersebut selesai, akan dilanjutkan ke Amdal
                                            dan pembebasan lahan.
                                            Penunjukan Konsultan Pengawas Kontraktor dan vendor yang
                                            sesuai.


 Dampak kejadian, informasi atau fakta     tidak ada
 material tersebut terhadap kegiatan
 operasional, hukum, kondisi keuangan,
 atau kelangsungan usaha Emiten atau
 Perusahaan Publik



Informasi Lain

Di kemudian hari proyek tersebut diharapkan akan menyumbangkan pendapatan Perseroan dari PLTM. Informasi awal
di atas bukan informasi yang bersifat material ataupun afiliasi dan bukan transaksi benturan Kepentingan, namun
Perseroan memandang perlu untuk melakukan Keterbukaan Informasi secara volunteer, mengingat Kementerian PU
telah menunjuk Perseroan sebagai Pemrakarsa sesuai surat dari Kementerian Pekerjaan Umum( PU ) No. SA. 0403-
Mn/782 tertanggal 27 Agustus 2024, dan telah dimuat di website Kementerian PU.
Page 3
Demikian untuk diketahui.


Hormat Kami,
Resource Alam Indonesia Tbk




Leny

Corporate Secretary




Resource Alam Indonesia Tbk
Gedung Bumi Raya Utama Group Jl. Pembangunan I No. 3 Jakarta Pusat
Telepon : 021-633-30-36, 021 3952-55-30 ( Hunting ), Fax : 021 - 6337006, www.



Nama Pengirim                     Leny

Jabatan                           Corporate Secretary
Tanggal dan Waktu                 28-10-2025 16:33

Lampiran                         1. 048RAINXC2025 KI Pemrakarsa B Bener.pdf


Dokumen ini merupakan dokumen resmi Resource Alam Indonesia Tbk yang tidak memerlukan tanda tangan karena
  dihasilkan secara elektronik oleh sistem pelaporan elektronik. Resource Alam Indonesia Tbk bertanggung jawab
                               penuh atas informasi yang tertera didalam dokumen ini.
Page 4
Go To Indonesian Page

 Letter / Announcement No.           048/RAIN/X/C/2025

 Issuer Name                         Resource Alam Indonesia Tbk

 Issuer Code                         KKGI

 Attachment                          1

 Subject                             Appointment of PT Resource Alam Indonesia, Tbk as the Initiator of the
                                     BENER Dam Micro Hydro Power Plant Project located in Purworejo Regency,
                                     Central Java Province by the Ministry of Public Works.

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company            Resource Alam Indonesia Tbk

 Business Activities                         Pertambangan batu bara


 Telephone                                   021-633-30-36, 021 3952-55-30 ( Hunting )

 Faximile                                    021 - 6337006

 Email Address                               info@raintbk.com; investor.relations@raintbk.com


 Date of Event                               27 October 2025

                                              Appointment of PT Resource Alam Indonesia, Tbk as the
 Type of Material Information or Facts       Initiator of the BENER Dam Micro Hydro Power Plant Project
                                             located in Purworejo Regency, Central Java Province by the
                                             Ministry of Public Works.
Page 5
 Description of Material Information or        Bener Dam is one of the National Strategic Projects (PSN).
 Facts                                         A. The main function of the Bener Dam
                                               Irrigation: This dam will support irrigation of agricultural land
                                               covering around 15,000 hectares area, especially in the
                                               Purworejo, Kebumen, and Kulon Progo areas
                                               Raw water supply: The Bener Dam PLTM will be the source of
                                               raw water for household, city and industrial needs with a
                                               capacity of around 1,500 liters per second.
                                               Flood control:
                                               This dam is designed to reduce flood discharge. The purpose
                                               is to reduce the risk of flooding in downstream areas.
                                               Producing electricity: This PLTM is projected to produce 6-10
                                               MW of electrical energy to fulfill the electricity needs in the
                                               Purworejo area and its surroundings.
                                               Tourism: This dam is also planned to become a natural tourism
                                               destination because of its location flanked by two hills.
                                               Fisheries: The construction of this dam will also support the
                                               development of the fisheries sector.
                                               Project Status: Feasibility Study
                                                            Estimated Project Cost: IDR 96 Billion
                                               Planned Electricity Sales: PLN UID Central Java
                                               Processes that have been and will be carried out
                                                      The Feasibility Study (FS) has been completed.
                                               The Feasibility Study (FS) is awaiting approval from the
                                               Directorate General of Water Resources Infrastructure
                                               Financing (DJPI SDA) of the Ministry of Public Works. Once
                                               approved, it will proceed to the Detailed Engineering Design
                                               (DED) process.
                                               The next process is the tender, which will be held by the
                                               Ministry of Public Works. Because PT Resource Alam
                                               Indonesia, Tbk (Rain Tbk) has been appointed as the project
                                               initiator, it is granted the right to match.
                                               Once this process is complete, the Environmental Impact
                                               Assessment (EIA) and land acquisition will be proceed.
                                               Appointment of the Supervising Consultant, Contractor, and
                                               appropriate vendors.


 Impact of event, material information or      none
 facts towards Issuers or Public
 Company’s operational activities, legal,
 financial condition, or going concern




Other Information

In future, the project is expected to contribute to the Company's revenue from the micro-hydro power plant. The
initial information above is not material or affiliated, and does not constitute a conflict of interest transaction.
However, the Company deems it necessary to conduct voluntary Information Disclosure, considering that the
Ministry of Public Works (PU) has appointed the Company as the Initiator in accordance with letter from the Ministry
of Public Works (PU) No. SA. 0403-Mn/782 dated August 27, 2024, which has been posted on the Ministry of Public
Works' website.

Thus to be informed accordingly.


Respectfully,
Resource Alam Indonesia Tbk
Page 6
Leny

Corporate Secretary




Resource Alam Indonesia Tbk
Gedung Bumi Raya Utama Group Jl. Pembangunan I No. 3 Jakarta Pusat
Phone : 021-633-30-36, 021 3952-55-30 ( Hunting ), Fax : 021 - 6337006, www.



Sender Name                        Leny

Function                           Corporate Secretary

Date and Time                      28-10-2025 16:33

Attachment                        1. 048RAINXC2025 KI Pemrakarsa B Bener.pdf


 This is an official document of Resource Alam Indonesia Tbk that does not require a signature as it was generated
     electronically by the electronic reporting system. Resource Alam Indonesia Tbk is fully responsible for the
                                      information contained within this document.

File

File Open PDF
Source IDX
Size0.01 MB
Published28 Oct 2025
Pages6
Characters13,209
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 10 people and organisations named in the text · linked when the evidence is strong

linked org Resource Alam Indonesia Tbk · Nama Perusahaan p.1 ×34
unresolved org Kementerian PU. p.1 ×4
unresolved org Direktorat Jenderal Pembiayaan Infrastruktur Sumber Daya Air p.2
unresolved org Rain Tbk p.2 ×2
unresolved org Kementerian Pekerjaan Umum p.2
unresolved org Leny Corporate p.3 ×2
unresolved person Leny · Corporate Secretary p.3 ×2
unresolved org Ministry of Public Works. p.4 ×4
unresolved org Directorate General of Water Resources Infrastructure Financing p.5
unresolved org Ministry of Public Works. Once p.5

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result