Source file signed link, expires in 15 minutes
Extracted text 80
Page 1
PT EXPLOITASI ENERGI INDONESIA Tbk
DAN ENTITAS ANAK/AND ITS SUBSIDIARIES
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM/
INTERIM CONSOLIDATED FINANCIAL STATEMENTS
UNTUK PERIODE ENAM BULAN YANG BERAKHIR 30 JUNI 2026 (TIDAK DIAUDIT)/
FOR THE SIX-MONTH PERIOD ENDED 30 JUNE 2026 (UNAUDITED)
Page 2
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
PT EXPLOITASI ENERGI INDONESIA Tbk PT EXPLOITASI ENERGI INDONESIA Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED FINANCIAL STATEMENTS
UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
DAFTAR ISI CONTENTS
Surat Pernyataan Direksi Director’s Statement
Ekshibit/
Exhibit
Laporan Posisi Keuangan Konsolidasian Interim A - A/3 Interim Consolidated Statement of Financial Position
Laporan Laba Rugi dan Penghasilan Interim Consolidated Statement of Profit or Loss and
Komprehensif Lain Konsolidasian Interim B Other Comprehensive Income
Laporan Perubahan Ekuitas Konsolidasian Interim C Interim Consolidated Statement of Changes in Equity
Laporan Arus Kas Konsolidasian Interim D Interim Consolidated Statement of Cash Flows
Catatan atas Laporan Keuangan Notes to the Interim Consolidated
Konsolidasian Interim E - E/77 Financial Statements
In
Page 3
Page 4
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit A Exhibit A
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENT OF FINANCIAL POSITION
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Catatan/ (Tidak Diaudit/ (Diaudit/
Notes Unaudited) Audited)
ASET ASSETS
Aset Lancar Current Assets
Kas dan bank 4 338.305.904 254.031.368 Cash on hand and in banks
Piutang usaha - pihak ketiga 5 327.576.750 114.645.217 Trade receivables - third parties
Piutang lain-lain Other receivables
Pihak ketiga 6 - - Third parties
Pihak berelasi 6,28a - - Related parties
Persediaan 7 9.587.139 47.100.987 Inventories
Pajak dibayar di muka 21a 124.404.904 149.856.774 Prepaid taxes
Biaya dibayar di muka dan Prepaid expenses and
uang muka 8 1.885.518 8.977.128 advance payments
Taksiran tagihan pajak penghasilan 21c 933.913 - Estimated claims for tax refund
Jumlah Aset Lancar 802.694.128 574.611.474 Total Current Assets
Aset Tidak Lancar Non-current Assets
Taksiran tagihan pajak penghasilan 21c - 933.913 Estimated claims for tax refund
Pajak tangguhan 21d 41.932.498 41.536.628 Deferred tax
Aset tetap - nilai buku 9 152.232.115 160.287.114 Fixed assets - book value
Aset hak-guna 10 667.935 1.028.493 Right-of-use assets
Uang jaminan 11 307.820 307.820 Security deposits
Aset lain-lain 12 112.644.681 112.644.681 Other assets
Uang muka keuangan 13 - - Financial advances
Jumlah Aset Tidak Lancar 307.785.049 316.738.649 Total Non-current Assets
JUMLAH ASET 1.110.479.177 891.350.123 TOTAL ASSETS
Lihat Catatan atas Laporan Keuangan Konsolidasian pada See accompanying Notes to the Consolidated Financial
Ekshibit E terlampir yang merupakan bagian tidak terpisahkan Statements on Exhibit E which are an integral part of the
dari Laporan Keuangan konsolidasian secara keseluruhan Consolidated Financial Statements taken as a whole
Page 5
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit A/2 Exhibit A/2
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENT OF FINANCIAL POSITION
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Catatan/ (Tidak Diaudit/ (Diaudit/
Notes Unaudited) Audited)
LIABILITAS DAN LIABILITIES AND
DEFISIENSI MODAL CAPITAL DEFICIENCY
Liabilitas Jangka Pendek Current Liabilities
Utang usaha Trade payables
Pihak ketiga 14 956.814.859 777.019.005 Third parties
Utang lain-lain Other payables
Pihak ketiga 18 232.616.304 241.989.190 Third parties
Pihak berelasi 18,28b 35.461.715 35.761.715 Related parties
Utang dividen 24 16.314.837 16.314.837 Dividend payables
Biaya masih harus dibayar 17 23.276.151 24.226.838 Accrued expenses
Utang pajak 21b 9.079.035 13.014.306 Tax payables
Uang muka pelanggan 16 21.174.291 21.174.291 Advances from customers
Utang bank - jangka panjang
yang jatuh tempo dalam Current maturity of
waktu satu tahun 15 63.922.228 61.413.954 long-term bank loan
Liabilitas keuangan lainnya - Other financial liabilities -
pihak ketiga - jangka pendek 19 56.679.284 56.633.374 third parties - current
Uang jaminan - jangka pendek 20 93.282.000 93.282.000 Security deposits - current
Liabilitas pembiayaan konsumen 100.438 246.630 Consumer financing liabilities
Liabilitas sewa - jangka pendek 10 450.321 426.045 Lease liabilities - current
Liabilitas imbalan pascakerja - Short-term post-employment
jangka pendek 22 16.219.157 16.219.157 benefits liabilities
Jumlah Liabilitas Jangka Pendek 1.525.390.620 1.357.721.342 Total Current Liabilities
Liabilitas Jangka Panjang Non-current Liabilities
Utang bank - jangka panjang
setelah dikurangi bagian yang
jatuh tempo dalam waktu Long-term bank loan - net of
satu tahun 15 27.863.513 61.129.657 current maturity
Liabilitas keuangan lainnya - Other financial liabilities -
pihak ketiga - jangka panjang 19 201.905.335 202.375.469 third parties – non-current
Uang jaminan - jangka panjang 20 286.660.000 324.160.000 Security deposits - non-current
Liabilitas sewa - jangka panjang 10 395.499 586.275 Lease liabilities - non-current
Liabilitas imbalan pascakerja - Long-term post-employment
jangka panjang 22 8.364.718 6.896.843 benefits liabilities
Cadangan biaya reklamasi 23 1.382.694 2.765.388 Reserve for reclamation cost
Jumlah Liabilitas Jangka Panjang 526.571.759 597.913.632 Total Non-current Liabilities
JUMLAH LIABILITAS 2.051.962.379 1.955.634.974 TOTAL LIABILITIES
Lihat Catatan atas Laporan Keuangan Konsolidasian pada See accompanying Notes to the Consolidated Financial
Ekshibit E terlampir yang merupakan bagian tidak terpisahkan Statements on Exhibit E which are an integral part of the
dari Laporan Keuangan konsolidasian secara keseluruhan Consolidated Financial Statements taken as a whole
Page 6
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit A/3 Exhibit A/3
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENT OF FINANCIAL POSITION
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Catatan/ (Tidak Diaudit/ (Diaudit/
Notes Unaudited) Audited)
DEFISIENSI MODAL CAPITAL DEFICIENCY
Modal saham Share capital
Modal dasar - Authorized capital -
300.000.000 saham Seri A dan 300,000,000 Series A shares
38.286.202.300 saham Seri B and 38,286,202,300 Series B
dengan nilai nominal Rp 2.000 shares with par value of Rp 2,000
per saham Seri A (nilai penuh) dan per Series A share (full amount)
Rp 100 per saham Seri B and Rp 100 per Series B
(nilai penuh) share (full amount)
Modal ditempatkan dan Issued and fully paid -
disetor penuh - 115.000.000 115,000,000 Series A shares
saham Seri A dan 8.841.361.206 and 8,841,361,206
saham Seri B 25 1.114.136.121 1.114.136.121 Series B shares
Tambahan modal disetor 26 1.367.057.045 1.492.584.159 Additional paid-in capital
Selisih transaksi dengan Difference arising from transaction
pihak nonpengendali 27 (18.038.076 ) (117.559.385 ) with non-controlling interest
Saldo laba (defisit) Retained earnings (deficit)
Telah ditentukan penggunaannya 142.054.887 142.054.887 Appropriated
Belum ditentukan penggunaannya (3.545.987.694 ) (3.668.795.259 ) Unappropriated
Ekuitas yang dapat
diatribusikan kepada Equity attributable to
Pemilik entitas induk (940.777.717 ) (1.037.579.477 ) Owners of the parent entity
Kepentingan nonpengendali 29 (705.485 ) (26.705.374 ) Non-controlling interest
JUMLAH DEFISIENSI MODAL (941.483.202 ) (1.064.284.851 ) TOTAL CAPITAL DEFICIENCY
JUMLAH LIABILITAS SETELAH TOTAL LIABILITIES NET OF
DIKURANGI DEFISIENSI MODAL 1.110.479.177 891.350.123 CAPITAL DEFICIENCY
Lihat Catatan atas Laporan Keuangan Konsolidasian pada See accompanying Notes to the Consolidated Financial
Ekshibit E terlampir yang merupakan bagian tidak terpisahkan Statements on Exhibit E which are an integral part of the
dari Laporan Keuangan konsolidasian secara keseluruhan Consolidated Financial Statements taken as a whole
Page 7
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit B Exhibit B
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
LAPORAN LABA RUGI DAN PENGHASILAN INTERIM CONSOLIDATED STATEMENT OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Catatan/ (Tidak Diaudit/ (Tidak Diaudit/
Notes Unaudited) Unaudited)
Pendapatan usaha 31 1.023.497.333 1.046.870.537 Operating revenues
Beban pokok pendapatan 32 (880.277.933 ) (820.946.564 ) Cost of revenues
LABA BRUTO 143.219.400 225.923.973 GROSS PROFIT
Beban umum dan administrasi 33 (36.907.261 ) (35.491.157 ) General and administrative expenses
LABA OPERASIONAL 106.312.139 190.432.816 INCOME FROM OPERATIONS
Penghasilan bunga 553.642 173.085 Interest income
Beban bunga dan keuangan lainnya 34 (24.198.273 ) (30.299.102 ) Interest and other financial charges
Pendapatan lain-lain - neto 35 59.086.646 2.504.301 Other income - net
LABA SEBELUM PAJAK PENGHASILAN 141.754.154 162.811.100 PROFIT BEFORE INCOME TAX
Manfaat (beban) pajak penghasilan Income tax benefit (expense)
Kini (19.262.266 ) (36.437.345 ) Current
Tangguhan 21d 376.020 383.319 Deferred
Beban pajak penghasilan - neto (18.886.246 ) (36.054.026 ) Income tax expenses – net
LABA PERIODE BERJALAN 122.867.908 126.757.074 PROFIT FOR THE PERIOD
PENGHASILAN KOMPREHENSIF LAIN OTHER COMPREHENSIVE INCOME
Pos yang tidak akan direklasifikasi Item that will not be reclassified
ke laba rugi to profit loss
Pengukuran kembali liabilitas Remeasurement of post-
imbalan pascakerja 22 (100.659 ) (562.805 ) employment benefits liabilities
Pajak terkait 21d 19.850 122.306 Related tax
JUMLAH LABA KOMPREHENSIF TOTAL COMPREHENSIVE INCOME
PERIODE BERJALAN 122.787.099 126.316.575 FOR THE PERIOD
JUMLAH LABA (RUGI) TOTAL PROFIT (LOSS)
PERIODE BERJALAN FOR THE PERIOD
DAPAT DIATRIBUSIKAN KEPADA ATTRIBUTABLE TO
Pemilik entitas induk 122.888.369 125.722.784 Owners of the parent entity
Kepentingan nonpengendali (20.461 ) 1.034.290 Non-controlling interest
JUMLAH 122.867.908 126.757.074 TOTAL
JUMLAH LABA (RUGI) KOMPREHENSIF TOTAL COMPREHENSIVE
PERIODE BERJALAN DAPAT INCOME (LOSS) FOR THE PERIOD
DIATRIBUSIKAN KEPADA ATTRIBUTABLE TO
Pemilik entitas induk 122.807.565 125.282.387 Owners of the parent entity
Kepentingan nonpengendali (20.466 ) 1.034.188 Non-controlling interest
JUMLAH 122.787.099 126.316.575 TOTAL
LABA PER SAHAM DASAR BASIC PROFIT PER SHARE
YANG DIATRIBUSIKAN KEPADA ATTRIBUTABLE TO OWNERS OF
PEMILIK ENTITAS INDUK THE PARENT ENTITY
(nilai penuh) 30 13,72 14,04 (full amount)
Lihat Catatan atas Laporan Keuangan Konsolidasian pada See accompanying Notes to the Consolidated Financial
Ekshibit E terlampir yang merupakan bagian tidak terpisahkan Statements on Exhibit E which are an integral part of the
dari Laporan Keuangan konsolidasian secara keseluruhan Consolidated Financial Statements taken as a whole
Page 8
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit C Exhibit C
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
Ekuitas yang dapat di atribusikan kepada pemilik entitas induk/
Equity attributable to the owners of the parent entity
Selisih transaksi Saldo laba (defisit)/
ekuitas dengan pihak Retained earnings (deficit)
Tambahan modal nonpengendali/ Kepentingan Defisiensi
disetor/ Difference in value of Telah ditentukan Belum ditentukan nonpengendali/ modal/
Catatan/ Modal saham/ Additional equity transaction with penggunaannya/ penggunaannya/ Jumlah/ Non-controlling Capital
Notes Share capital paid-in capital non-controlling interest Appropriated Unappropriated Total interest deficiency
Saldo per 1 Januari 2025 1.114.136.121 1.492.584.159 (340.590 ) 142.054.887 (3.863.407.973 ) (1.114.973.396 ) (140.773.122 ) (1.255.746.518 ) Balance as of 1 January 2025
Penurunan modal dasar Decrease in authorized capital
pada entitas anak - - - - - - (1.440.000 ) (1.440.000 ) in subsidiary
Penyesuaian piutang setoran modal Adjustment receivable on share capital
pada entitas anak - - - - - - 198.000 198.000 in subsidiary
Laba periode berjalan - - - - 125.722.784 125.722.784 1.034.290 126.757.074 Profit for the period
Penghasilan komprehensif lain Other comprehensive income:
Pengukuran kembali Remeasurement of post-employment
liabilitas imbalan kerja - neto 22 - - - - (440.397 ) (440.397 ) (102 ) (440.499 ) benefits liabilities
Saldo per 30 Juni 2025 1.114.136.121 1.492.584.159 (340.590 ) 142.054.887 (3.738.125.586 ) (989.691.009 ) (140.980.934 ) (1.130.671.943 ) Balance as of 30 June 2025
Saldo per 1 Januari 2026 1.114.136.121 1.492.584.159 (117.559.385 ) 142.054.887 (3.668.795.259 ) (1.037.579.477 ) (26.705.374 ) (1.064.284.851 ) Balance as of 1 January 2026
Dampak perubahan saham Effect of changes in subsidiaries’s
di entitas anak - neto 27 - - (26.005.805 ) - - (26.005.805 ) 26.005.805 - share capital - net
Pelepasan entitas anak - (125.527.114 ) 125.527.114 - - - 14.550 14.550 Disposal of subsidiary
Laba (rugi) periode berjalan - - - - 122.888.369 122.888.369 (20.461 ) 122.867.908 Profit (loss) for the period
Penghasilan komprehensif lain Other comprehensive income:
Pengukuran kembali Remeasurement of post-employment
liabilitas imbalan kerja - neto 22 - - - - (80.804 ) (80.804 ) (5 ) (80.809 ) benefits liabilities – net
Saldo per 30 Juni 2026 1.114.136.121 1.367.057.045 (18.038.076 ) 142.054.887 (3.545.987.694 ) (940.777.717 ) (705.485 ) (941.483.202 ) Balance as of 30 June 2026
Lihat Catatan atas Laporan Keuangan Konsolidasian pada See accompanying Notes to the Consolidated Financial
Ekshibit E terlampir yang merupakan bagian tidak terpisahkan Statements on Exhibit E which are an integral part of the
dari Laporan Keuangan konsolidasian secara keseluruhan Consolidated Financial Statements taken as a whole
Page 9
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit D Exhibit D
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
LAPORAN ARUS KAS KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENT OF CASH FLOWS
UNTUK PERIODE ENAM BULAN YANG BERAKHIR FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Catatan/ (Tidak Diaudit/ (Tidak Diaudit/
Notes Unaudited) Unaudited)
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS OPERASI OPERATING ACTIVITIES
Penerimaan kas dari pelanggan 810.565.800 831.528.340 Cash received from customers
Pembayaran kas kepada pemasok (654.268.460 ) (705.404.138 ) Cash paid to suppliers
Pembayaran kas kepada karyawan (21.208.761 ) (20.886.476 ) Cash paid to employees
Pembayaran kas untuk pajak (114.399.621 ) (108.957.307 ) Cash paid for taxes
Penerimaan restitusi Receipt of value
pajak pertambahan nilai (PPN) 21 113.628.609 126.254.750 added tax (VAT) refunds
Pembayaran beban bunga dan Payment of interest and
keuangan lainnya (24.153.859 ) (29.449.449 ) other financial charges
Pembayaran beban operasional Payments of other operating
lainnya - neto (7.932.970 ) (8.916.892 ) expenses – net
Kas Neto Diperoleh dari Net Cash Provided by
Aktivitas Operasi 102.230.738 84.168.828 Operating Activities
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS INVESTASI INVESTING ACTIVITIES
Investasi yang diukur pada Invesment measured at
nilai wajar (reksa dana) fair value (mutual funds)
melalui laba rugi: through profit or loss:
Pembelian - (30.000.000 ) Purchase
Penerimaan bunga 553.642 173.085 Interest receipt
Pembayaran jaminan - (162.396 ) Payment of guarantee
Perolehan aset tetap 9 (60.537 ) (199.500 ) Acquisition of fixed assets
Penjualan aset tetap 9 60.537 - Disposal of fixed assets
Penerimaan dari Proceeds from
pelepasan entitas anak 39 50.000.000 - disposal of subsidiary
Pengembalian uang jaminan 20 (37.500.000 ) (25.000.000 ) Return of security deposit
Kas entitas anak yang didekonsolidasi (5.797 ) - Cash of deconsolidated subsidiary
Kas Neto Diperoleh dari (Digunakan Net Cash Provided by
untuk) Aktivitas Investasi 13.047.845 (55.188.811 ) (Used in) Investing Activities
ARUS KAS DARI CASH FLOWS FROM
AKTIVITAS PENDANAAN FINANCING ACTIVITIES
Pembayaran utang bank 15 (30.426.883 ) (26.741.725 ) Payment of bank loans
Pembayaran liabilitas keuangan lainnya 19 (424.224 ) (561.129 ) Payment of other financial liabilities
Pembayaran liabilitas pembiayaan Payment of consumer financing
konsumen (146.192 ) (135.997 ) liabilities
Pembayaran bunga liabilitas sewa Payment of interest on consumer
pembiayaan konsumen (6.748 ) (16.943 ) financing liabilities
Kas Neto Digunakan untuk Net Cash Used in
Aktivitas Pendanaan (31.004.047 ) (27.455.794 ) Financing Activities
KENAIKAN NETO NET INCREASE IN
KAS DAN BANK 84.274.536 1.524.223 CASH ON HAND AND IN BANKS
CASH ON HAND AND IN BANKS
KAS DAN BANK AWAL PERIODE 4 254.031.368 143.112.472 AT BEGINNING OF THE PERIOD
CASH ON HAND AND IN BANKS
KAS DAN BANK AKHIR PERIODE 4 338.305.904 144.636.695 AT END OF THE PERIOD
Lihat Catatan atas Laporan Keuangan Konsolidasian pada See accompanying Notes to the Consolidated Financial
Ekshibit E terlampir yang merupakan bagian tidak terpisahkan Statements on Exhibit E which are an integral part of the
dari Laporan Keuangan konsolidasian secara keseluruhan Consolidated Financial Statements taken as a whole
Page 10
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E Exhibit E
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
1. INFORMASI UMUM 1. GENERAL INFORMATION
a. Pendirian dan Informasi Umum a. Establishment and General Information
PT Exploitasi Energi Indonesia Tbk (“Perusahaan”) PT Exploitasi Energi Indonesia Tbk (“the Company”)
didirikan berdasarkan Akta Notaris No. 18 tanggal was established based on Notarial Deed No. 18 dated
13 September 1999 dari Mulyoto, S.H., Notaris di 13 September 1999 of Mulyoto, S.H., Notary in
Boyolali. Akta Pendirian ini telah disahkan oleh Menteri Boyolali. The Deed of Establishment was approved by
Kehakiman Republik Indonesia dengan Surat Keputusan the Minister of Justice of the Republic of Indonesia in
No. C-1920HT.01.01.TH.2000 tanggal 10 Februari 2000 its Decision Letter No. C-1920HT.01.01.TH.2000
dan telah diumumkan dalam Berita Negara Republik dated 10 February 2000 and was published in the
Indonesia No. 8 tanggal 26 Januari 2001, Tambahan State Gazette of the Republic of Indonesia No. 8
No. 631. dated 26 January 2001, Supplement No. 631.
Anggaran Dasar Perusahaan telah mengalami beberapa The Company’s Articles of Association have been
kali perubahan, yang terakhir adalah berdasarkan Akta amended several times, the latest of which is based
Notaris No. 05 tanggal 18 Maret 2025 dari Dahlia, S.H., on Notarial Deed No. 05 dated 18 March 2025 of
Notaris di Jakarta, mengenai perubahan alamat serta Dahlia, S.H., Notary in Jakarta, regarding the change
pernyataan kembali seluruh Anggaran Dasar of address and the reaffirmation of the entire
Perusahaan. Perubahan akta tersebut telah mendapat Articles of Association of the Company. The Deed of
pengesahan dari Menteri Hukum Republik Indonesia amendment has been approved by the Minister of Law
dengan Surat Keputusan No. AHU-AH.01.03-0098005 of the Republic of Indonesia in its Decision Letter
tanggal 10 April 2025. No. AHU-AH.01.03-0098005 dated 10 April 2025.
Sesuai dengan Pasal 3 Anggaran Dasar Perusahaan, Based on Article 3 of the Company’s Articles of
ruang lingkup kegiatan Perusahaan terutama bergerak Association, the scope of its activities is to engage in
dalam bidang ketenagalistrikan, perdagangan besar the electricity sector, other specialized wholesale
khusus lainnya, aktivitas penunjang angkutan, aktivitas trade, transportation support activities, holding
perusahaan holding, dan aktivitas konsultasi company activities, and management consulting
manajemen. Pada tanggal 14 Oktober 2011, activities. On 14 October 2011, the Company signed
Perusahaan telah menandatangani Berita Acara the Minutes of the Commercial Operations Date of
Commercial Operation Date PLTU - Pangkalan Bun PLTU Pangkalan Bun with capacity of 2 x 7 MW to
berkapasitas 2 x 7 MW untuk menjalankan kegiatan commence its commercial power plant operations.
operasional pembangkit listrik.
PLTU Perusahaan berlokasi di Pangkalan Bun, The Company’s PLTU are located in Pangkalan Bun,
Kalimantan Tengah. Central Kalimantan.
Perusahaan memulai kegiatan komersial pada tahun The Company started its commercial operations in
2001. Perusahaan berdomisili di Jakarta dan kantor 2001. The Company is domiciled in Jakarta and its
pusat Perusahaan terletak di Sinarmas Land Plaza head office is located in Sinarmas Land Plaza
Sudirman Lt. 9 Jl. Jenderal Sudirman Kav. 21, RT/RW. Sudirman 9th floor Jl. Jenderal Sudirman Kav. 21,
10/01 Kel. Karet, Kec. Setiabudi, Jakarta Selatan - RT/RW. 10/01 Kel. Karet, Kec. Setiabudi, South
12930. Jakarta - 12930.
Entitas induk Perusahaan adalah Anderson Bay Pte Ltd, Anderson Bay Pte Ltd is the parent entity of the
sedangkan penerima manfaat akhir Perusahaan adalah Company, while the Company’s ultimate benefical
Cho Wai Cheng. owner is Cho Wai Cheng.
b. Penawaran Umum Efek b. Public Offering of Securities Issued
Pada tanggal 31 Oktober 2001, Perusahaan On 31 October 2001, the Company obtained the
memperoleh pernyataan efektif dari Ketua Badan Notice of Effectivity from the Chairman of the
Pengawas Pasar Modal (BAPEPAM), sekarang Otoritas Capital Market Supervisory Agency (BAPEPAM),
Jasa Keuangan (OJK) dengan Surat No. S-2710/ currently the Indonesian Financial Services Authority
PM/2001 untuk melakukan penawaran umum perdana (OJK) in its Letter No. S-2710/PM/2001 for its Initial
kepada masyarakat atas 800.000.000 saham Public Offering (IPO) of 800,000,000 shares with
Perusahaan dengan nilai nominal Rp 100 (nilai penuh) nominal value of Rp 100 (full amount) per share at an
per saham dan harga penawaran Rp 105 (nilai penuh) offering price of Rp 105 (full amount) per share with
per saham, disertai insentif berupa Waran Seri I secara Series I Warrants attached free of charge.
cuma-cuma.
Page 11
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/8 Exhibit E/8
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
1. INFORMASI UMUM (Lanjutan) 1. GENERAL INFORMATION (Continued)
b. Penawaran Umum Efek (Lanjutan) b. Public Offering of Securities Issued (Continued)
Setiap lima (5) saham, melekat empat (4) Waran Seri I For every five (5) shares, there are four (4) Series I
di mana pemegang satu (1) waran berhak membeli satu Warrants attached which entitles the holder the right
(1) saham dengan harga pelaksanaan sebesar Rp 125 to purchase an additional one (1) share for each
(nilai penuh) per saham. Masa pelaksanaan waran dari warrant at an exercise price of Rp 125 (full amount)
tanggal 21 Mei 2002 sampai dengan tanggal per share. The right can be exercised from 21 May
22 November 2004. 2002 until 22 November 2004.
Pada tanggal 21 November 2001, saham tersebut telah On 21 November 2001, these shares were listed on the
dicatatkan pada Bursa Efek Indonesia. Indonesia Stock Exchange.
Untuk meningkatkan permodalan Perusahaan, yang To increase the capital of the Company, which
berdampak terhadap peningkatan jumlah efek, resulted to an increased number of shares, the
Perusahaan telah melakukan beberapa aksi korporasi Company has conducted several corporate actions
berupa penawaran umum terbatas sebagaimana such as limited public offering rights issue, as
dijelaskan di bawah ini: described below:
i. Pada tanggal 5 Desember 2003, Perusahaan i. On 5 December 2003, the Company obtained the
memperoleh pernyataan efektif dari Ketua Notice of Effectivity No. S-2997/PM/2003 from
BAPEPAM, sekarang Otoritas Jasa Keuangan (OJK) the Chairman of BAPEPAM, currently the
dengan Surat No. S-2997/PM/2003 untuk Indonesian Financial Services Authority (OJK) for
melakukan Penawaran Umum Terbatas (PUT) I its Rights Issue I with maximum amount of
dalam rangka Hak Memesan Efek Terlebih dahulu 3,220,000,000 Series B shares with par value and
maksimum 3.220.000.000 saham Seri B dengan nilai offering price of Rp 100 (full amount) per share.
nominal dan harga penawaran sebesar Rp 100 (nilai
penuh) per saham.
Setiap pemegang satu (1) saham Seri A (hasil Every holder of one (1) Series A share (resulting
reverse stock) berhak membeli 28 saham Seri B from reverse stock split) has the right to purchase
dengan harga pelaksanaan sebesar Rp 100 (nilai 28 Series B shares at an exercise price of Rp 100
penuh) per saham. (full amount) per share.
Setiap pemegang dua puluh delapan (28) saham For every holder of twenty eight (28) Series B
Seri B melekat delapan (8) Waran Seri II dan setiap shares, there are eight (8) Series II Warrants
pemegang satu (1) waran berhak membeli satu (1) attached and every holder of one (1) warrant has
saham Seri B dengan harga pelaksanaan sebesar the right to purchase one (1) Series B share at an
Rp 100 (nilai penuh) per saham. Masa pelaksanaan exercise price of Rp 100 (full amount) per share.
mulai dari tanggal 21 Juni 2004 sampai dengan The right can be exercised from 21 June 2004
8 Januari 2007. until 8 January 2007.
ii. Pada tanggal 5 Desember 2012, Perusahaan ii. On 5 December 2012, the Company obtained the
memperoleh pernyataan efektif dari Ketua Notice of Effectivity No. S-13877/BL/2012 from
BAPEPAM-LK dengan Surat No. S-13877/BL/2012 the Chairman of BAPEPAM-LK for its Limited
untuk melakukan PUT II dalam rangka Hak Public Offering II with Preemptive Rights of
Memesan Efek Terlebih Dahulu (HMETD) sejumlah 4,709,810,634 Series B shares with par value of
4.709.810.634 saham Seri B dengan nilai nominal Rp 100 (full amount) per share and offering price
Rp 100 (nilai penuh) per saham dan harga of Rp 500 (full amount) per share.
penawaran sebesar Rp 500 (nilai penuh) per saham.
Setiap pemegang seratus sepuluh (110) saham Every holder of one hundred and ten (110) shares
berhak atas seratus dua puluh dua (122) saham has the right to one hundred and twenty-two
baru HMETD, di mana setiap satu (1) HMETD berhak (122) Preemptive Rights, and every holder of one
membeli sebanyak satu (1) saham baru yang (1) Preemptive Right has the right to purchase
ditawarkan. Masa pendaftaran pelaksanaan mulai one (1) new share offered. The registration
dari tanggal 20 Desember 2012 sampai dengan period starts from 20 December 2012 to 7 January
7 Januari 2013, dengan penjatahan pemesanan 2013, and allotment of additional reservations on
tambahan pada tanggal 10 Januari 2013. 10 January 2013.
Page 12
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/9 Exhibit E/9
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
1. INFORMASI UMUM (Lanjutan) 1. GENERAL INFORMATION (Continued)
c. Susunan Pengurus Perusahaan c. Composition of the Company’s Management
Dewan Komisaris, Direksi dan Karyawan Board of Commissioners, Directors and Employee
Berdasarkan Akta No. 25 dari Notaris Dahlia, S.H., Based on Notarial Deed No. 25 from Notary Dahlia,
di Jakarta tanggal 21 Juni 2023, pemegang saham S.H., dated 21 June 2023 in Jakarta, the Company’s
Perusahaan menyetujui perubahan susunan Direksi dan shareholders agreed to change the composition of
Dewan Komisaris. Perubahan ini telah diterima dan the Directors and Board of Commissioners. This
dicatat di dalam Sistem Administrasi Badan Hukum amendment has been accepted and registered in the
Kementerian Hukum dan Hak Asasi Manusia Republik Legal Administration System Entity of the Ministry of
Indonesia dalam Surat Penerimaan Pemberitahuan Law and Human Rights of the Republic of Indonesia in
No. AHU-AH.01.09.0140336 tanggal 11 Juli 2023. its Notification Acceptance Letter No. AHU-AH.01.09.
Susunan Dewan Komisaris dan Direksi Perusahaan pada 0140336 dated 11 July 2023. The composition of the
tanggal 30 Juni 2026 dan 31 Desember 2025 adalah Company’s Board of Commissioners and Directors as
sebagai berikut: of 30 June 2026 and 31 December 2025 are as follows:
Dewan Komisaris Board of Commissioners
Presiden Komisaris Pudjianto Gondosasmito President Commissioner
Komisaris Djoko Sumaryono Commissioner
Komisaris Independen Edwin Pamimpin Situmorang Independent Commissioner
Komisaris Independen Cahyo Suryo Putro Independent Commissioner
Direksi Board of Directors
Presiden Direktur Robin Wirawan President Director
Wakil Presiden Direktur Sudarwanta Vice President Director
Direktur Erry Indriyana Director
Dewan Komisaris dan Direksi adalah manajemen Boards of Commissioners and Directors are the key
kunci Perusahaan yang memiliki kewenangan dan management personnel of the Company that have
tanggung jawab untuk merencanakan, memimpin dan authority and responsibility for planning, directing
mengendalikan aktivitas Perusahaan. and controlling the activities of the Company.
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, Grup As of 30 June 2026 and 31 December 2025, the Group
memiliki karyawan tetap sebanyak 31 orang (tidak has approximately 31 permanent employees
diaudit). (unaudited).
Komite Audit Audit Committee
Berdasarkan Surat Keputusan Sirkuler Dewan Komisaris Based on the Circular Letter of the Company's Board
Perusahaan No. 03.15/SK/DEKOM/EEI/IV/2026 tanggal of Commissioners No. 03.15/SK/DEKOM/EEI/IV/2026
15 April 2026, susunan Komite Audit Perusahaan pada dated 15 April 2026, the composition of the
tanggal 30 Juni 2026 adalah sebagai berikut: Company's Audit Committee as of 30 June 2026 is as
follows:
Ketua Cahyo Suryo Putro Chairman
Anggota Denny Susanto Member
Anggota Ferdy Bernard Maruhal Amora Member
Berdasarkan Surat Keputusan Sirkuler Dewan Komisaris Based on the Circular Letter of the Company's Board
Perusahaan No. 01.02/SK/DEKOM/EEI/XII/2025 tanggal of Commissioners No. 01.02/SK/DEKOM/EEI/XII/2025
2 Desember 2025, susunan Komite Audit Perusahaan dated 2 December 2025, the composition of the
pada tanggal 31 Desember 2025 adalah sebagai berikut: Company's Audit Committee as of 31 December 2025
is as follows:
Ketua Cahyo Suryo Putro Chairman
Anggota Limi Mulyanto Member
Anggota Denny Susanto Member
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, As of 30 June 2026 and 31 December 2025, the
Sekretaris Perusahaan adalah Wim Andrian. Corporate Secretary is Wim Andrian.
Kompensasi manajemen kunci Key management compensation
Kompensasi dikeluarkan untuk manajemen kunci Total compensation incurred for key management
untuk periode yang berakhir 30 Juni 2026 dan personnel for the periods ended 30 June 2026 and
31 Desember 2025 masing-masing sebesar 31 December 2025 amounted to Rp 10,397,968 and
Rp 10.397.968 dan Rp 20.795.935. Rp 20,795,935, respectively.
Page 13
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/10 Exhibit E/10
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
1. INFORMASI UMUM (Lanjutan) 1. GENERAL INFORMATION (Continued)
d. Struktur Grup d. The Group Structure
Dalam laporan keuangan konsolidasian ini, Perusahaan In these consolidated financial statements, the
dan Entitas Anak secara keseluruhan dirujuk sebagai Company and its Subsidiaries are collectively referred
“Grup”. to as the “Group”.
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, As of 30 June 2026 and 31 December 2025, the Group
struktur Grup adalah sebagai berikut: structure is as follows:
Persentase kepemilikan/ Jumlah aset sebelum eliminasi/
Percentage of ownership Total assets before elimination
Kegiatan usaha/ Kedudukan/ Tahun operasi/
Business activities Domicile Operating year 2026 2025 2026 2025
Entitas anak dengan
kepemilikan langsung/
Directly owned
subsidiary
1. PT Energi Batubara Perdagangan/ Jakarta 2011 99,97% 99,97% 206.904.965 424.229.122
Indonesia (EBI) Trading Selatan
Entitas anak dengan
kepemilikan tidak
langsung melalui EBI/
Indirectly owned
subsidiaries through EBI
1. PT Trans Lintas Jasa pelayaran/ Jakarta 2008 99,99% 99,99% 1.441.642 80.802
Segara (TLS) Shipping services Selatan
2. PT Korporindo Guna Pertambangan dan Kalimantan 2008 99,76% 99,66% 24.296.349 29.848.469
Bara (KGB) perdagangan batu bara/ Selatan
Coal mining and trading
3. PT Sekti Rahayu Pertambangan dan Kalimantan 2012 - 90,00% - 330.731
Indah (SRI)* perdagangan batu bara/ Tengah
Coal mining and trading
4. PT Abe Jaya Pertambangan/ Jakarta 2012 51,30% 51,30% 33.338.171 33.573.577
Perkasa (AJP) Mining Selatan
*) Tidak dikonsolidasi efektif pada 29 April 2026 (Catatan 39). *) Deconsolidated effective on 29 April 2026 (Note 39).
e. Izin Usaha Pertambangan dan Angkutan Laut e. Mining and Sea Freight Business Licenses
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, izin As of 30 June 2026 and 31 December 2025, mining and
usaha pertambangan dan angkutan laut Grup adalah sea freight business licenses of the Group are as
sebagai berikut: follows:
Surat Keputusan/ Perizinan/
Decree Letter Licenses
Nomor Surat/ Tanggal/ Dikeluarkan oleh/ Jenis/ Pemegang/ Periode/ Luas/ Lokasi/
No. Number Letter Date Issued by Type Holder Period Area Location
1. No. 81201111710990001 30 Mei/May 2025 Kepala Badan Koordinasi Izin Pengangkutan dan EEI 30 Mei/ - Sinar Mas Land
Penanaman Modal / Penjualan Batu Bara/ May 2030 Plaza Sudirman
Head of Investment Coal Transportation Lantai 9, Jalan
Coordinating Board and Sales Permit Jenderal Sudirman
Kav. 21, Jakarta
Selatan
2. No. 188.45/227/2012 24 Mei/May 2012 Bupati Barito Utara/ Izin Usaha AJP 24 Mei/ 3,467 Ha Desa Kandui dan
Regent of Barito Utara Pertambangan May 2032 Majangkan
Operasi Produksi/ Kec. Gunung
Production Operating Timang
Mining License Kab. Barito Utara
Kalimatan Tengah
3. No. B.XXXIV-529/AT.54 10 Oktober/ Direktorat Jenderal Izin Usaha Perusahaan TLS Tidak terbatas/ - Seluruh wilayah
October 2008 Perhubungan Laut/ Angkutan Laut/ Unlimited Negara Republik
Directorate General of See Freight Business Indonesia
Sea Transportation Licenses
4. No. 02202038827590002 24 Desember/ Menteri Energi dan Izin Usaha SRI* 28 Desember/ 2,659 Ha Desa Santilik dan
December 2024 Sumber Daya Mineral, Pertambangan December 2033 Satiung Kec.
Menteri Investasi dan Operasi Produksi/ Mentaya Hulu Kab.
Hilirisasi/ Production Operating Kotawaringin Timur
Minister of Energy and Mining License Kalimantan Tengah
Mineral Resources,
Minister of Investment
and Downstreaming
*) Tidak dikonsolidasi efektif pada 29 April 2026 (Catatan 39). *) Deconsolidated effective on 29 April 2026 (Note 39).
Page 14
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/11 Exhibit E/11
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
a. Kepatuhan terhadap Standar Akuntansi Keuangan a. Compliance with Indonesian Financial Accounting
(SAK) Standards (SAK)
Laporan keuangan konsolidasian PT Exploitasi Energi The consolidated financial statements of
Indonesia Tbk dan entitas anak (selanjutnya PT Exploitasi Energi Indonesia Tbk and subsidiaries
dinyatakan sebagai “Grup”) disusun dan disajikan (hereinafter referred to as a “Group”) have been
berdasarkan Standar Akuntansi Keuangan di Indonesia prepared and presented in accordance with
(“SAK”), yang mencakup Pernyataan Standar Akuntansi Indonesian Financial Accounting Standards (“SAK”),
Keuangan (“PSAK”) dan Interpretasi Standar Akuntansi which comprise the Statement of Financial
Keuangan (“ISAK”) yang diterbitkan oleh Dewan Accounting Standards (“PSAK”) and Interpretations of
Standar Akuntansi Keuangan, Ikatan Akuntan Indonesia Statement of Financial Accounting Standard (“ISAK”)
serta Peraturan No. VIII.G.7 Lampiran keputusan Ketua issued by the Financial Accounting, Standards Board
BAPEPAM No. KEP-347/BL/2012 tanggal 25 Juni 2012 of the Indonesian Institute of Accountants and Rule
yang terdapat di dalam Peraturan dan Pedoman No. VIII.G.7 Attachment of Chairman of BAPEPAM’s
Penyajian dan Pengungkapan Laporan Keuangan yang Decision No. KEP-347/BL/2012 dated 25 June 2012 on
diterbitkan oleh Badan Pengawas Pasar Modal dan the Regulations and the Guidelines on Financial
Lembaga Keuangan (“BAPEPAM-LK”, yang fungsinya Statements Presentation and Disclosures issued by
dialihkan kepada OJK sejak tanggal 1 Januari 2013). Capital Market and Financial Institutions Supervisory
Agency (“BAPEPAM-LK”, which function has been
transferred to OJK starting on 1 January 2013).
b. Dasar Penyusunan Laporan Keuangan Konsolidasian b. Basis of Preparation of Consolidated Financial
Statements
Laporan keuangan konsolidasian, kecuali untuk laporan The consolidated financial statements, except for the
arus kas konsolidasian, disusun berdasarkan dasar consolidated statement of cash flows, have been
akrual dengan menggunakan konsep biaya perolehan, prepared on the accrual basis using the historical cost
kecuali beberapa akun tertentu disusun berdasarkan basis of accounting, except for certain accounts which
pengukuran lain sebagaimana diuraikan dalam are measured on the basis described in the related
kebijakan akuntansi masing-masing akun tersebut. accounting policies for those accounts.
Laporan arus kas konsolidasian disusun dengan The consolidated statement of cash flows has been
menggunakan metode langsung dengan prepared based on the direct method by classifying
mengelompokkan arus kas dalam aktivitas operasi, cash flows on the basis of operating, investing and
investasi dan pendanaan. financing activities.
Mata uang pelaporan yang digunakan untuk Reporting currency used in the preparation of the
penyusunan laporan keuangan konsolidasian adalah consolidated financial statements is Indonesian
mata uang Rupiah, yang juga merupakan mata uang Rupiah, which is also the Group’s functional currency.
fungsional Grup.
Penyusunan laporan keuangan konsolidasian sesuai The preparation of consolidated financial statements
dengan Standar Akuntansi Keuangan di Indonesia in conformity with Indonesian Financial Accounting
mengharuskan penggunaan estimasi dan asumsi. Hal Standards requires the use of certain critical
tersebut juga mengharuskan manajemen untuk accounting estimates. It also requires management to
membuat pertimbangan dalam proses penerapan exercise its judgment in the process of applying the
kebijakan akuntansi Grup. Area yang kompleks atau Group’s accounting policies. The areas involving a
memerlukan tingkat pertimbangan yang lebih tinggi higher degree of judgment or complexity, or areas
atau area di mana asumsi dan estimasi dapat where assumptions and estimates are significant to
berdampak signifikan terhadap laporan keuangan the consolidated financial statements.
konsolidasian.
c. Prinsip-prinsip Konsolidasi c. Principles of Consolidation
Laporan keuangan konsolidasian meliputi laporan The consolidated financial statements incorporate
keuangan Perusahaan dan entitas-entitas yang the financial statements of the Company and entities
dikendalikan secara langsung ataupun tidak langsung in which the Company has the ability to directly or
oleh Perusahaan. indirectly exercise control.
Laporan keuangan Entitas Anak disusun dengan periode The financial statements of the Subsidiaries are
pelaporan yang sama dengan Perusahaan. Kebijakan prepared for the same reporting period as the
akuntansi yang digunakan dalam penyajian laporan Company. The accounting policies adopted in
keuangan konsolidasian telah diterapkan secara preparing the consolidated financial statements have
konsisten oleh Grup, kecuali dinyatakan lain. been consistently applied by the Group, unless
otherwise stated.
Page 15
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/12 Exhibit E/12
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
c. Prinsip-prinsip Konsolidasi (Lanjutan) c. Principles of Consolidation (Continued)
Entitas-entitas anak dikonsolidasi secara penuh sejak Subsidiaries are fully consolidated from the date of
tanggal akuisisi, yaitu tanggal Grup memperoleh acquisition, being the date on which the Group
pengendalian, sampai dengan tanggal Grup kehilangan obtains control, and continue to be consolidated until
pengendalian. the date when such control ceases.
Transaksi antar perusahaan, saldo dan keuntungan Inter-company transactions, balances and unrealized
antar entitas Grup yang belum direalisasi dieliminasi. gains on transactions between Group companies are
Kerugian yang belum direalisasi juga dieliminasi. eliminated. Unrealized losses are also eliminated.
Kebijakan akuntansi entitas anak diubah jika Accounting policies of subsidiaries have been changed
diperlukan untuk memastikan konsistensi dengan where necessary to ensure consistency with the
kebijakan akuntansi yang diadopsi Grup. policies adopted by the Group.
Secara spesifik, Grup mengendalikan investee jika, dan Specifically, the Group controls an investee if, and
hanya jika, Grup memiliki seluruh hal berikut ini: only if, the Group has:
a. Kekuasaan atas investee (misal, hak yang ada a. Power over the investee (i.e., existing rights that
memberikan kemampuan kini untuk mengarahkan give it the current ability to direct the relevant
aktivitas relevan investee); activities of the investee);
b. Eksposur atau imbal hasil variabel dari b. Exposure, or rights, to variable returns from its
keterlibatannya dengan investee; dan involvement with the investee; and
c. Kemampuan untuk menggunakan kekuasaannya c. The ability to use its power over the investee to
atas investee untuk memengaruhi jumlah imbal affect its returns.
hasil investor.
Ketika Grup memiliki kurang dari hak suara mayoritas, When the Group has less than a majority of the voting
Grup dapat mempertimbangkan semua fakta dan or similar right of an investee, the Group considers
keadaan yang relevan dalam menilai apakah memiliki all relevant facts and circumstances in assessing
kekuasaan atas investee tersebut: whether it has power over an investee, including:
a. Pengaturan kontraktual dengan pemilik hak suara a. The contractual arrangement with the other vote
yang lain. holders of the investee.
b. Hak yang timbul dari pengaturan kontraktual lain. b. Rights arising from other contractual
arrangements.
c. Hak suara dari hak suara potensial Grup. c. The Group’s voting rights and potential voting
rights.
Grup menilai apakah investor mengendalikan investee The Group re-assesses whether or not it controls an
jika fakta dan keadaan mengindikasikan adanya investee if facts and circumstances indicate that
perubahan terhadap satu atau lebih dari tiga elemen there are changes to one or more of the three
pengendalian. Konsolidasi atas entitas anak dimulai elements of control. Consolidation of a subsidiary
ketika Grup memiliki pengendalian atas entitas anak begins when the Group obtains control over the
dan berhenti ketika Grup kehilangan pengendalian atas subsidiary and ceases when the Group loses control of
entitas anak. Aset, liabilitas, penghasilan dan beban the subsidiary. Assets, liabilities, income and
atas entitas anak yang diakuisisi atau dilepas selama expenses of a subsidiary acquired or disposed of
periode termasuk dalam laporan laba rugi dan during the period are included in the consolidated
penghasilan komprehensif lain konsolidasian dari statement of profit or loss and other comprehensive
tanggal Grup memperoleh pengendalian sampai dengan income from the date the Group gains control until
tanggal Grup menghentikan pengendalian atas entitas the date the Group ceases to control the subsidiary.
anak.
Laba atau rugi dan setiap komponen atas penghasilan Profit or loss and each component of other
komprehensif lain diatribusikan pada pemegang saham comprehensive income (OCI) are attributed to the
entitas induk grup dan pada kepentingan equity holders of the parent of the group and to the
nonpengendali (“KNP”), walaupun hasil di kepentingan non-controlling interest (“NCI”), even if this results
nonpengendali mempunyai saldo defisit. in the NCI having a deficit balance.
Transaksi dengan kepentingan nonpengendali yang Transactions with NCI that do not result in loss of
tidak mengakibatkan hilangnya pengendalian control are accounted for as equity transactions. The
merupakan transaksi ekuitas. Selisih antara nilai wajar difference between the fair value of any
imbalan yang dibayar dan bagian yang diakuisisi atas consideration paid and the relevant share acquired of
nilai tercatat aset neto entitas anak dicatat pada the carrying value of net assets of the subsidiary is
ekuitas. Keuntungan atau kerugian pelepasan recorded in equity. Gains or losses on disposals to NCI
kepentingan nonpengendali juga dicatat pada ekuitas. are also recorded in equity.
Page 16
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/13 Exhibit E/13
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
c. Prinsip-prinsip Konsolidasi (Lanjutan) c. Principles of Consolidation (Continued)
Jika Grup kehilangan pengendalian atas anak If the Group loses control over a subsidiary, it:
perusahaan, maka Grup:
i. Menghentikan pengakuan aset (termasuk setiap i. Derecognizes the assets (including goodwill) and
goodwill) dan liabilitas Entitas anak; liabilities of the subsidiary;
ii. Menghentikan pengakuan jumlah tercatat setiap ii. Derecognizes the carrying amount of any NCI;
KNP;
iii. Menghentikan pengakuan akumulasi selisih iii. Derecognizes the cumulative translation
penjabaran, yang dicatat di ekuitas, bila ada; differences, recorded in equity, if any;
iv. Mengakui nilai wajar pembayaran yang diterima; iv. Recognizes the fair value of the consideration
received;
v. Mengakui setiap sisa investasi pada nilai wajarnya; v. Recognizes the fair value of any investment
retained;
vi. Mengakui setiap perbedaan yang dihasilkan vi. Recognizes any surplus or deficit in profit or loss;
sebagai keuntungan atau kerugian sebagai laba and
rugi; dan
vii. Mereklasifikasi ke laba rugi proporsi keuntungan vii. Reclassifies the parent’s share of components
dan kerugian yang telah diakui sebelumnya dalam previously recognized in OCI to profit or loss or
penghasilan komprehensif lain atau saldo laba, retained earnings, as appropriate, as would be
begitu pula menjadi persyaratan jika Grup akan required if the Group had directly disposed of the
melepas secara langsung aset atau liabilitas yang related assets or liabilities.
terkait.
KNP mencerminkan bagian atas laba atau rugi dan aset NCI represents the portion of the profit or loss and
neto dari Entitas anak yang tidak dapat diatribusikan, net assets of the Subsidiary not attributable directly
secara langsung maupun tidak langsung, pada or indirectly to the Company, which are presented in
Perusahaan, yang masing-masing disajikan dalam the consolidated statement of profit or loss and other
laporan laba rugi dan penghasilan komprehensif lain comprehensive income and under the equity section
konsolidasian dan dalam ekuitas pada laporan posisi of the consolidated statement of financial position,
keuangan konsolidasian, terpisah dari bagian yang respectively, separately from the corresponding
dapat diatribusikan kepada pemilik entitas induk. portion attributable to the owners of the parent
entity.
Ketika proporsi ekuitas yang dimiliki oleh kepentingan When the proportion of the equity held by
nonpengendali berubah, Grup menyesuaikan jumlah noncontrolling interests changes, Group shall adjust
tercatat kepentingan pengendali dan kepentingan the carrying amounts of the controlling and
nonpengendali untuk mencerminkan perubahan noncontrolling interests to reflect the changes in
kepemilikan relatifnya dalam entitas anak. Grup their relative interests in the subsidiary. Group shall
tersebut mengakui secara langsung dalam ekuitas recignise directly in equity any difference between
setiap perbedaan antara jumlah tercatat kepentingan the amount by which the non-controlling interests
nonpengendali yang disesuaikan dan nilai wajar are adjusted and the fair value of the consideration
imbalan yang dibayar atau diterima dan paid or received, and attribute it to the owner of the
mengatribusikannya kepada pemilik entitas induk. Parent.
Grup mencatat perbedaan tersebut di ekuitas sebagai Group records the difference in equity as difference
selisih transaksi perubahan ekuitas entitas anak. in transactions of changes in equity of subsidiary
entities.
d. Perubahan terhadap PSAK dan ISAK d. Changes on PSAK and ISAK
Penerapan dari revisi standar berikut yang berlaku The adoption of these amended standards, which are
efektif mulai 1 Januari 2025 tidak menimbulkan effective beginning 1 January 2025 did not result in
perubahan substansial terhadap kebijakan akuntansi substantial changes to the Company’s accounting
Grup dan pengaruh yang material atas jumlah yang policies and had no material impact on the amounts
dilaporkan atas tahun berjalan atau tahun reported for the current or prior financial years.
sebelumnya.
• Amendemen PSAK 221 “Pengaruh Perubahan Kurs • Amendment of PSAK 221 “The Effects of Changes
Valuta Asing” - Kekurangan Ketertukaran. in Foreign Exchange Rates” - Lack of
Exchangeability.
• PSAK 117 “Kontrak Asuransi”. • PSAK 117 “Insurance Contract”.
Page 17
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/14 Exhibit E/14
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
d. Perubahan terhadap PSAK dan ISAK (Lanjutan) d. Changes on PSAK and ISAK (Continued)
Penerapan dari revisi standar berikut yang berlaku The adoption of these amended standards, which are
efektif mulai 1 Januari 2026 tidak menimbulkan effective beginning 1 January 2026 did not result in
perubahan substansial terhadap kebijakan akuntansi substantial changes to the Company’s accounting
Perusahaan dan pengaruh yang material atas jumlah policies and had no material impact on the amounts
yang dilaporkan atas tahun berjalan atau tahun reported for the current or prior financial years.
sebelumnya.
• Amendemen PSAK 109 dan PSAK 107 • Amendment of PSAK 109 and PSAK 107
“Pengungkapan tentang Klasifikasi dan Pengukuran “Classification and Measurement of Financial
Instrumen Keuangan”. Instruments”.
• Amendemen PSAK 109 dan PSAK 107 terkait • Amendments to PSAK 109 and PSAK 107 of
Kontrak yang Mengacu pada Listrik Bergantung Contracts Referencing Nature-dependent
Alam. Electricity.
Penerapan dari standar baru berikut berlaku efektif The adoption of the new standard is effective
mulai 1 Januari 2027. Penerapan retrospektif beginning 1 January 2027. Retrospective application
diwajibkan, sehingga informasi komparatif untuk is required, and so the comparative information for
tahun keuangan yang berakhir pada 31 Desember 2026 the financial year ending 31 December 2026 will be
akan disajikan ulang sesuai dengan standar ini. restated in accordance with this standard.
• PSAK 118 “Penyajian dan Pengungkapan dalam • PSAK 118 “Presentation and Disclosure in
Laporan Keuangan”. Financial Statements”.
e. Instrumen Keuangan e. Financial Instruments
Aset dan liabilitas keuangan diakui dalam laporan Financial assets and liabilities are recognized in the
posisi keuangan konsolidasian jika, dan hanya jika, consolidated statement of financial position when,
Grup merupakan salah satu pihak dalam ketentuan and only when, the Group becomes one party to the
kontraktual instrumen tersebut. contractual provisions of such instruments.
Aset Keuangan Financial Assets
Grup mengklasifikasikan aset keuangan dalam kategori The Group classifies its financial assets into the
berikut: following categories:
(i) Aset keuangan diukur pada biaya perolehan (i) Financial assets measured at amortized costs;
diamortisasi;
(ii) Aset keuangan diukur pada nilai wajar melalui (ii) Financial assets measured at fair value through
laba rugi; dan profit or loss; and
(iii) Aset keuangan diukur pada nilai wajar melalui (iii) Financial assets measured at fair value through
penghasilan komprehensif lain. other comprehensive income.
Klasifikasi ini tergantung pada model bisnis Grup dan The classification depends on the Group’s business
persyaratan kontraktual arus kas - apakah penentuan model and the contractual terms of the cash flows
arus kasnya semata dari pembayaran pokok dan bunga. when determining whether the cash flows are solely
payments of principal and interest.
Grup menentukan klasifikasi aset keuangan tersebut The Group determines the classification of its
pada pengakuan awal dan tidak bisa melakukan financial assets at initial recognition and cannot
perubahan setelah penerapan awal tersebut. change the classification made at initial recognition.
Aset Keuangan yang Diukur pada Biaya Diamortisasi Financial Assets Measured at Amortized Cost
Klasifikasi ini berlaku untuk instrumen utang yang This classification applied to debt instruments which
dikelola dalam model bisnis dimiliki untuk are held under a hold-to-collect business model and
mendapatkan arus kas dan memiliki arus kas yang which have cash flows that meet “the solely
memenuhi kriteria “semata-mata dari pembayaran payments of principal and interest” criteria.
pokok dan bunga”.
Page 18
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/15 Exhibit E/15
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
e. Instrumen Keuangan (Lanjutan) e. Financial Instruments (Continued)
Aset Keuangan (Lanjutan) Financial Assets (Continued)
Aset Keuangan yang Diukur pada Biaya Diamortisasi Financial Assets Measured at Amortized Cost
(Lanjutan) (Continued)
Pada pengakuan awal, piutang usaha yang tidak At initial recognition, trade receivables that do not
memiliki komponen pendanaan yang signifikan, diakui have a significant financing component are
sebesar harga transaksi. Aset keuangan lainnya recognized at their transaction price. Other financial
awalnya diakui sebesar nilai wajar dikurangi biaya assets are initially recognized at fair value plus
transaksi terkait. Aset keuangan ini selanjutnya diukur related transaction costs. They are subsequently
sebesar biaya perolehan diamortisasi menggunakan measured at amortized cost using the effective
metode suku bunga efektif. Keuntungan atau kerugian interest method. Any gain or loss on the
pada penghentian atau modifikasi aset keuangan yang derecognition or modification of a financial asset
dicatat pada biaya perolehan diamortisasi diakui pada held at amortized cost is recognized in profit or loss.
laba rugi.
Grup menentukan klasifikasi aset keuangan tersebut The Group determines the classification of its
pada pengakuan awal dan tidak bisa melakukan financial assets at initial recognition and cannot
perubahan setelah penerapan awal tersebut. change the classification made at initial recognition.
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, aset As of 30 June 2026 and 31 December 2025, the
keuangan Grup yang diklasifikasikan sebagai aset Group’s financial assets classified as financial assets
keuangan yang diukur pada biaya perolehan at amortized cost comprise cash and banks, trade
diamortisasi terdiri dari kas dan bank, piutang usaha, receivables, other receivables, security deposits and
piutang lain-lain, uang jaminan dan uang muka financial advances in the consolidated statements of
keuangan dalam laporan posisi keuangan financial position.
konsolidasian.
Aset keuangan yang diukur pada nilai wajar melalui Financial assets measured at fair value through profit
laba rugi or loss
Pada tahun 2025 Grup membeli dan menjual In 2025, the Group bought and sold mutual funds, the
reksadana, Grup telah membuat pemilihan yang tidak Group has made an irrevocable election to classify
dapat dibatalkan untuk mengklasifikasikan investasi the investments at fair value through profit or loss as
pada nilai wajar melalui laba rugi karena Grup the Group considers this measurement to be the most
menganggap pengukuran ini sebagai yang paling representative of the business model for these assets.
representatif dari model bisnis untuk aset ini. All fair value gains or losses are recognized in profit
Keuntungan atau kerugian nilai wajar diakui pada laba or loss.
rugi.
Pada saat pengakuan awal, Grup mengukur investasi At initial recognition, the Group measures the mutual
reksa dana pada nilai wajar, biaya transaksi yang fund investment at fair value, transaction cost
terkait langsung dengan perolehan investasi tersebut directly attributable to the acquisition of the
dibebankan ke laba rugi. investment are charged to profit or loss.
Aset keuangan diukur pada nilai wajar melalui Financial assets measured at fair value through other
penghasilan komprehensif lain comprehensive income
Grup telah membuat pemilihan yang tidak dapat The Group has made an irrevocable election to
dibatalkan untuk mengklasifikasikan investasi pada classify the investments at fair value through other
nilai wajar melalui penghasilan komprehensif lain comprehensive income rather than through profit or
daripada melalui laba rugi karena Grup menganggap loss as the Group considers this measurement to be
pengukuran ini sebagai yang paling representatif dari the most representative of the business model for
model bisnis untuk aset ini. Nilai tersebut dicatat pada these assets. They are carried at fair value with
nilai wajar dengan perubahan nilai wajar diakui dalam changes in fair value recognized in other
penghasilan komprehensif lain dan diakumulasikan comprehensive income and accumulated in the fair
dalam nilai wajar melalui cadangan penghasilan value through other comprehensive income reserves.
komprehensif lain. Pada saat pelepasan, saldo dalam Upon disposal, any balance within fair value through
nilai wajar melalui cadangan penghasilan komprehensif other comprehensive income reserves is reclassified
lain direklasifikasi langsung ke laba direklasifikasi ke directly to profit or loss.
laba rugi.
Page 19
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/16 Exhibit E/16
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
e. Instrumen Keuangan (Lanjutan) e. Financial Instruments (Continued)
Aset Keuangan (Lanjutan) Financial Assets (Continued)
Aset keuangan diukur pada nilai wajar melalui Financial assets measured at fair value through other
penghasilan komprehensif lain (Lanjutan) comprehensive income (Continued)
Pembelian dan penjualan aset keuangan yang diukur Purchases and sales of financial assets measured at
pada nilai wajar melalui penghasilan komprehensif lain fair value through other comprehensive income are
diakui pada tanggal penyelesaian dengan perubahan recognized on settlement date with any change in fair
nilai wajar antara tanggal perdagangan dan tanggal value between trade date and settlement date being
penyelesaian diakui pada cadangan yang diukur pada recognized in the fair value through other
nilai wajar penghasilan komprehensif lain. comprehensive income reserves.
Aset keuangan dihentikan pengakuannya jika, dan Financial assets are derecognized when, and only
hanya jika, 1) hak kontraktual atau arus kas yang when, 1) the contractual rights to the cash flows from
berasal dari aset keuangan berakhir atau 2) Grup the financial asset expire, or 2) the Group transfers
mengalihkan aset keuangan dan pengalihan tersebut the financial assets and the transfer qualifies for
memenuhi kriteria penghentian pengakuan. derecognition.
Liabilitas Keuangan Financial Liabilities
Pada saat pengakuan awal, liabilitas keuangan diukur At initial recognition, financial liabilities are
pada nilai wajar dikurangi biaya transaksi yang terkait measured at their fair value minus transaction costs
langsung dengan perolehan atau penerbitan liabilitas that are directly attributable to the acquisition or the
keuangan tersebut. Setelah pengakuan awal, liabilitas issuance of financial liabilities. After initial
keuangan dapat diukur 1) pada biaya perolehan recognition, financial liabilities might be measured 1)
diamortisasi atau 2) nilai wajar melalui laba rugi. Pada at amortized cost or 2) fair value through profit or
tanggal 30 Juni 2026, seluruh liabilitas keuangan loss. As of 30 June 2026, all of the financial liabilities
diukur pada biaya perolehan yang diamortisasi dengan are measured at amortized cost using effective
menggunakan metode suku bunga efektif. interest method.
Liabilitas keuangan (atau bagian dari liabilitas Financial liabilities (or a part of financial liabilities)
keuangan) dihentikan pengakuannya jika, dan hanya are derecognized when, and only when, such
jika, liabilitas tersebut berakhir yaitu ketika liabilities are extinguished when the obligation
kewajiban yang ditetapkan dalam kontrak dilepaskan specified in the contract is discharged or cancelled or
atau dibatalkan atau kedaluwarsa. Selisih antara expired. The differences between the carrying
jumlah tercatat liabilitas keuangan (atau bagian dari amount of financial liabilities (or a part of financial
liabilitas keuangan) yang berakhir atau dialihkan ke liabilities) those extinguished or transferred to other
pihak lain dan imbalan yang dibayarkan diakui dalam party and the consideration paid are recognized in
laba rugi. profit or loss.
Saling Hapus antar Aset dan Liabilitas Keuangan Offsetting Financial Assets and Liabilities
Aset dan liabilitas keuangan dapat saling hapus dan Financial assets and liabilities are offset and the net
nilai netonya disajikan dalam laporan posisi keuangan amount is presented in the consolidated statement of
konsolidasian jika, dan hanya jika, 1) Grup saat ini financial position when, and only when, 1) the Group
memiliki hak yang dapat dipaksakan secara hukum currently has a legally enforceable right to offset the
untuk melakukan saling hapus atas jumlah yang telah recognized amounts and 2) intends either to settle on
diakui dan 2) berniat untuk menyelesaikan secara neto a net basis, or to realize the asset and settle the
atau untuk merealisasikan aset dan menyelesaikan liability simultaneously.
liabilitasnya secara simultan.
Page 20
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/17 Exhibit E/17
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
f. Penurunan Nilai Aset Keuangan f. Impairment of Financial Assets
Aset keuangan dinilai apakah terdapat indikasi Financial assets are assessed for indicators of
penurunan nilai pada setiap akhir periode pelaporan. impairment at the end of each reporting date.
Aset keuangan diturunkan nilainya apabila terdapat Financial assets are impaired where there is objective
bukti objektif sebagai akibat adanya satu atau lebih evidence that, as a result of one or more events that
peristiwa yang terjadi setelah pengakuan awal aset occurred after the initial recognition of the financial
keuangan tersebut dan dilakukan estimasi terhadap asset and the estimated future cash flows of the
arus kas masa depan dari aset keuangan tersebut yang financial assets have been affected. The Group
akan terdampak. Grup membandingkan antara risiko compares the risk of a default occurring on the
gagal bayar yang terjadi atas aset keuangan pada saat financial asset as at the reporting date with the risk
periode pelaporan dengan risiko gagal bayar yang of a default occurring on the financial asset as of the
terjadi atas aset keuangan pada saat pengakuan awal date of recognition and considers reasonable and
dan mempertimbangkan kewajaran serta ketersediaan supportable information, that is available without
informasi, yang tersedia tanpa biaya atau usaha pada undue cost or effort at the reporting date about past
saat tanggal pelaporan terkait dengan kejadian masa events, current conditions and forecasts of future
lalu, kondisi terkini dan perkiraan atas kondisi ekonomi economic conditions, that are indicative of
dimasa depan, yang mengindikasikan kenaikan risiko significant increases in credit risk since initial
kredit sejak pengakuan awal. recognition.
Pada setiap tanggal pelaporan, Grup mengukur At the end of each reporting date, the Group
penyisihan kerugian aset keuangan sejumlah kerugian calculates any impairment provision in financial
ekspektasian sepanjang umurnya jika risiko kredit atas assets based on its lifetime expected credit loss if the
aset keuangan tersebut telah meningkat secara credit risk of financial assets has increased
signifikan sejak pengakuan awal. Namun, jika risiko significantly since its initial recognition. However, if
kredit aset keuangan tersebut tidak meningkat secara credit risk has not increased significantly since initial
signifikan sejak pengakuan awal, maka Grup mengakui recognition, then 12 months of expected credit loss is
sejumlah kerugian kredit ekspektasian 12 bulan. recognized.
Grup menerapkan metode yang disederhanakan untuk The Group applied a simplified approach to measure
mengukur kerugian kredit ekspektasian tersebut such expected credit loss for trade receivables, other
terhadap piutang usaha, piutang lain-lain dan uang receivables and financial advances.
muka keuangan.
g. Kas dan Bank g. Cash on Hand and in Banks
Kas dan bank mencakup kas dan bank yang tidak Cash on hand and in banks are cash on hand and cash
digunakan sebagai jaminan dan tidak dibatasi in banks which are not used as collateral and are not
penggunaannya. restricted.
h. Persediaan h. Inventories
Persediaan dinyatakan berdasarkan biaya perolehan Inventories are stated at the lower of cost or net
atau nilai realisasi neto, mana yang lebih rendah (the realizable value, whichever is lower (the lower of
lower of cost and net realizable value). Biaya cost and net realizable value). The cost of inventories
persediaan ditentukan dengan menggunakan Metode is determined by using the First In First Out (FIFO)
Pertama Masuk Pertama Keluar. Biaya persediaan batu method. The cost of coal inventories includes cost of
bara mencakup biaya harga pokok pembelian batu bara purchase and other direct costs. It excludes
dan biaya langsung lainnya. Biaya tersebut tidak borrowing costs. The net realizable value is the
termasuk biaya pinjaman. Nilai realisasi neto adalah estimated selling price in the ordinary course of
estimasi harga jual dalam kegiatan usaha biasa business less the estimated costs of completion and
dikurangi estimasi biaya penyelesaian dan estimasi the estimated costs necessary to make the sale.
biaya yang diperlukan untuk membuat penjualan.
Cadangan kerugian penurunan nilai persediaan Allowance for impairment losses inventories is
dibentuk untuk menyesuaikan nilai persediaan ke nilai provided to reduce the carrying values of inventories
realisasi neto. to their net realizable values.
Page 21
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/18 Exhibit E/18
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
i. Biaya Dibayar di Muka dan Uang Muka i. Prepaid Expenses and Advance Payments
Biaya dibayar di muka dibebankan pada usaha sesuai Prepaid expenses are charged to operations over the
masa manfaat biaya dengan menggunakan metode periods benefited using the straight-line method.
garis lurus.
Pada awalnya, uang muka merupakan pembayaran atas Initially, advances are payments for the procurement
pengadaan barang dan/atau jasa yang akan of goods and/or services that are charged to
dibebankan pada beban usaha ketika barang dan atau operations when the goods or services are received.
jasa yang diterima. Akan tetapi, Grup berniat untuk However, the Group intends to ask for the advance
meminta kembali uang muka tersebut dalam bentuk payment in the form of money instead of goods and
uang dari pada barang dan atau jasa dan or services and classified as financial advances.
diklasifikasikan sebagai uang muka keuangan.
j. Reksa Dana j. Mutual Fund
Perusahaan mengakui investasi pada reksa dana dalam The Company recognizes mutual fund investment in
laporan posisi keuangan, jika dan hanya jika, the statement of financial position, if and only if, the
Perusahaan menjadi salah satu pihak dalam ketentuan Company becomes one party in contractual
kontraktual instrument reksa dana tersebut. arrangement in the mutual fund instrument.
Perusahaan mengklasifikasikan investasi pada reksa The Company classifies the mutual fund investment
dana sebagai aset keuangan yang dicatat pada nilai as a financial asset recorded at fair value through
wajar melalui laba rugi dan penghasilan komprehensif profit or loss and other comprehensive income due to
lain karena alasan berikut ini: the following reasons:
Nilai wajar melalui laba rugi Fair value through profit or loss
Aset keuangan diklasifikasikan pada nilai wajar melalui Financial assets are measured at fair value through
laba rugi (FVTPL) jika tidak memenuhi kondisi yang profit or loss (FVTPL) if it does not meet the
disyaratkan untuk diukur pada biaya perolehan conditions required to be measured at amortized cost
diamortisasi atau nilai wajar melalui penghasilan or fair value through other comprehensive income.
komprehensif lain. Biaya-biaya transaksi aset keuangan Transaction costs of financial assets carried at fair
yang tercatat pada nilai wajar melalui laba rugi, value through profit or loss are expensed in profit or
dibebankan pada laba rugi. loss.
Nilai wajar melalui penghasilan komprehensif lain Fair value through other comprehensive income
• Investasi dikelola dalam model bisnis yang • Investment is managed at business model that
bertujuan untuk memiliki aset keuangan dalam aims to own financial asset in order to obtain
rangka mendapatkan arus kas kontraktual dan contractual cash flows and sell financial assets
menjual aset keuangan (hold to collect and sell), (hold to collect and sell), and
dan • The contractual terms of a financial asset result
• Persyaratan kontraktual dari aset keuangan in cash flows on a specific date solely from
menghasilkan arus kas pada tanggal tertentu yang payments of principal and interest of the
semata dari pembayaran pokok dan bunga dari principal amount outstanding.
jumlah pokok terutang.
Pada saat pengakuan awal, Perusahaan mengukur At first recognition, Company measures the mutual
investasi reksa dana pada nilai wajar, ditambah atau fund investment at fair value, plus or minus
dikurangi biaya transaksi yang terkait langsung dengan transaction cost directly attributable to the
perolehan investasi tersebut. acquisition of the investment.
Perusahaan menghitung penurunan nilai untuk Company calculates impairment value of mutual fund
investasi reksa dana yang diukur pada nilai wajar investment measured at fair value through other
melalui penghasilan komprehensif lain, jika comprehensive income, if necessary.
diperlukan.
Page 22
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/19 Exhibit E/19
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
k. Aset Tetap k. Fixed Assets
Aset tetap kecuali tanah dinyatakan sebesar biaya Fixed assets, except land, are stated at cost less
perolehan dikurangi akumulasi penyusutan dan rugi accumulated depreciation and any impairment loss.
penurunan nilai. Biaya perolehan termasuk biaya Such cost includes the cost of replacing part of the
penggantian bagian aset tetap saat biaya tersebut fixed assets when the cost is incurred, if the
terjadi, jika memenuhi kriteria pengakuan. recognition criteria are met. Likewise, when a major
Selanjutnya, pada saat inspeksi yang signifikan inspection is performed, its cost is recognized in the
dilakukan, biaya inspeksi itu diakui sebagai jumlah carrying amount of the assets as a replacement if the
tercatat aset tetap sebagai suatu penggantian jika recognition criteria are met. All other repairs and
memenuhi kriteria pengakuan. Semua biaya perbaikan maintenance costs that do not meet the recognition
dan pemeliharaan yang tidak memenuhi kriteria criteria are recognized in profit or loss as incurred.
pengakuan diakui dalam laba rugi pada saat
terjadinya.
Penyusutan dihitung dengan menggunakan metode Depreciation is computed using the straight-line
garis lurus berdasarkan taksiran masa manfaat method over the estimated useful lives of the assets
ekonomis aset tetap sebagai berikut: as follows:
Tarif penyusutan/ Tahun/
Depreciation rate Years
Prasarana jalan masuk 3,33% 30 Infrastructure of entrance road
Bangunan 5% - 10% 10 - 20 Buildings
PLTU - Pangkalan Bun 5% 20 PLTU - Pangkalan Bun
Pelabuhan 5% 20 Port
Perlengkapan kapal dan tongkang 12,5% 8 Equipment of barge and vessel
Peralatan produksi 6,25% 16 Factory equipment
Peralatan kantor 25% 4 Office equipment
Kendaraan 12,5% - 25% 4-8 Vehicles
Peralatan dan perabotan 12,5% - 25% 4-8 Furnitures and fixtures
Tanah dinyatakan berdasarkan biaya perolehan dan Land is stated at cost and not depreciated. Costs
tidak diamortisasi. Biaya pengurusan legal hak atas associated with the acquisition of legal rights of land
tanah ketika tanah diperoleh pertama kali diakui when the land was first acquired are recognized as
sebagai bagian dari biaya perolehan aset tanah. Biaya part of the cost of land. Costs associated with the
pengurusan perpanjangan atau pembaharuan legal hak extension or renewal of legal rights of land are
atas tanah diakui sebagai aset tak berwujud dan recognized as an intangible asset and amortized over
diamortisasi sepanjang umur hukum atau umur the legal life of the land rights or economic life of
ekonomis tanah, mana yang lebih pendek. the land, whichever is shorter.
Aset dalam penyelesaian dinyatakan sebesar biaya Construction in progress is stated at cost and is
perolehan dan disajikan sebagai bagian dari aset tetap. presented as part of fixed assets. The accumulated
Akumulasi biaya perolehan aset dalam penyelesaian cost will be reclassified to the appropriate fixed
akan dipindahkan ke masing-masing aset tetap yang assets account when the construction is substantially
bersangkutan pada saat aset tersebut selesai completed and the constructed asset is ready for its
dikerjakan dan siap digunakan. intended use.
Jumlah tercatat aset tetap dihentikan pengakuannya The carrying value of fixed assets is derecognized
pada saat dilepaskan atau saat tidak ada manfaat upon disposal or when no future economic benefits
ekonomis masa depan yang diharapkan dari are expected from its use. Any gain or loss arising on
penggunaannya. Laba atau rugi yang timbul dari derecognition of the assets is charged to the
penghentian pengakuan aset diakui dalam laporan laba consolidated statement of profit or loss and other
rugi dan penghasilan komprehensif lain konsolidasian comprehensive income in the year the assets are
pada tahun aset tersebut dihentikan pengakuannya. derecognized.
Masa manfaat ekonomis, nilai residu dan metode The estimated useful lives, residual values and
penyusutan direviu setiap akhir tahun dan pengaruh depreciation method are reviewed at the end of each
dari setiap perubahan estimasi tersebut berlaku reporting period, with the effect of any changes in
prospektif. estimates accounted for on a prospective basis.
Page 23
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/20 Exhibit E/20
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
l. Sewa l. Leases
Semua sewa dicatat dengan mengakui aset hak-guna All leases are accounted by recognizing a right of use
dan liabilitas sewa kecuali untuk: assets and a lease liability except for:
- Sewa aset bernilai rendah; dan - Leases of low value assets; and
- Sewa dengan durasi 12 bulan atau kurang. - Leases with a duration of 12 months or less.
Mengidentifikasi Sewa Identifying Leases
Grup memperhitungkan suatu kontrak, atau bagian dari The Group accounts for a contract, or a portion of a
suatu kontrak, sebagai suatu sewa ketika Grup contract, as a lease when it conveys the right to use
memberikan hak untuk menggunakan aset selama an asset for a period of time in exchange for
suatu jangka waktu untuk dipertukarkan dengan consideration. Leases are those contracts that satisfy
imbalan. Sewa adalah kontrak yang memenuhi kriteria the following criteria:
berikut:
- Terdapat aset identifikasian; - There is an identified asset;
- Grup memperoleh secara substansial semua - The Group obtains substantially all the economic
manfaat ekonomis dari penggunaan aset; dan benefits from use of the asset; and
- Grup memiliki hak untuk mengarahkan penggunaan - The Group has the right to direct use of the
aset. asset.
Grup mempertimbangkan apakah pemasok memiliki The Group considers whether the supplier has
hak substitusi substantif. Jika pemasok memang substantive substitution rights. If the supplier does
memiliki hak-hak tersebut, kontrak tidak diidentifikasi have those rights, the contract is not identified as
sebagai penyebab timbulnya sewa. giving rise to a lease.
Dalam menentukan apakah Grup mendapatkan secara In determining whether the Group obtains
substansial seluruh manfaat ekonomik dari penggunaan substantially all the economic benefits from use of
aset selama periode penggunaan, Grup hanya the asset, the Group considers only the economic
mempertimbangkan manfaat ekonomi yang timbul dari benefits that arise use of the asset, not those
penggunaan aset, bukan manfaat yang terkait dengan incidental to legal ownership or other potential
kepemilikan legal atau manfaat potensial lainnya. benefits.
Dalam menentukan apakah Grup memiliki hak In determining whether the Group has the right to
untuk mengarahkan penggunaan aset, Grup direct use of the asset, the Group considers whether
mempertimbangkan apakah Grup mengarahkan it directs how and for what purpose the asset is used
bagaimana dan untuk tujuan apa aset tersebut throughout the period of use.
digunakan selama periode penggunaan.
Jika tidak ada keputusan signifikan yang harus dibuat If there are no significant decisions to be made
karena sifat aset tersebut, Grup mempertimbangkan because they are pre-determined due to the nature
apakah ia terlibat dalam desain aset dengan cara of the asset, the Group considers whether it was
menetapkan sebelumnya bagaimana dan untuk tujuan involved in the design of the asset in a way that
apa aset akan digunakan selama periode penggunaan. predetermines how and for what purpose the asset
Jika kontrak atau bagian dari kontrak tidak memenuhi will be used throughout the period of use. If the
kriteria ini, Grup menerapkan PSAK lain yang berlaku, contract or portion of a contract does not satisfy
bukan PSAK No. 116. these criteria, the Group applies other applicable
PSAK rather than PSAK No. 116.
Penentuan Suku Bunga Pinjaman Incremental yang The Determination of the Incremental Borrowing Rate
Digunakan Untuk Mengukur Liabilitas Sewa Used to Measure Lease Liabilities
Liabilitas sewa diukur pada nilai kini dari pembayaran Lease liabilities are measured at the present value
kontraktual terutang kepada pesewa selama masa of the contractual payments due to the lessor over
sewa dengan tingkat diskonto yang ditentukan the lease term, with the discount rate determined
mengacu pada suku bunga implisit Grup yaitu 5,75% by reference to the Group’s interest rate implicit
pada saat dimulainya sewa. Pembayaran sewa variabel of 5.75% on commencement of the lease. Variable
hanya termasuk dalam pengukuran liabilitas sewa jika lease payments are only included in the
mereka bergantung pada indeks atau tarif. Dalam kasus measurement of the lease liability if they depend
seperti itu, pengukuran awal dari liabilitas sewa on an index or rate. In such cases, the initial
mengasumsikan elemen variabel akan tetap tidak measurement of the lease liability assumes the
berubah selama masa sewa. Pembayaran sewa variabel variable element will remain unchanged
lain-lain dibebankan pada periode yang terkait. throughout the lease term. Other variable lease
payments are expensed in the period to which they
relate.
Page 24
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/21 Exhibit E/21
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
m. Provisi m. Provision
Umum General
Provisi diakui jika Grup mempunyai kewajiban kini Provisions are recognized when the Group has present
(hukum maupun konstruktif) sebagai akibat peristiwa obligation (legal or constructive) as a result of a past
masa lalu, yang memungkinkan Grup harus event, it is probable that the Group will be required
menyelesaikan kewajiban tersebut dan estimasi yang to settle the obligation and a reliable estimate can be
andal mengenai jumlah kewajiban tersebut dapat made of the amount of the obligation.
dibuat.
Jumlah yang diakui sebagai provisi adalah hasil The amount recognized as a provision is the best
estimasi terbaik pengeluaran yang diperlukan untuk estimate of the consideration required to settle the
menyelesaikan kewajiban kini pada tanggal pelaporan, obligation at the reporting date, taking into account
dengan mempertimbangkan risiko dan ketidakpastian the risks and uncertainties surrounding the obligation.
terkait kewajiban tersebut. Ketika provisi diukur Where a provision is measured using the cash flows
menggunakan estimasi arus kas untuk menyelesaikan estimated to settle the present obligation, its carrying
kewajiban kini, maka nilai tercatat provisi adalah nilai amount is the present value of those cash flows.
kini arus kas tersebut.
Jika sebagian atau seluruh pengeluaran untuk When some or all of the economic benefits required
menyelesaikan provisi diganti oleh pihak ketiga, maka to settle a provision are expected to be recovered
penggantian itu diakui hanya pada saat timbul from a third party, the receivable is recognized as an
keyakinan bahwa penggantian pasti akan diterima dan asset if it is virtually certain that reimbursement will
jumlah penggantian dapat diukur dengan andal. be received and the amount of the receivable can be
measured reliably.
Pengeluaran Biaya Lingkungan untuk Reklamasi Environmental and Reclamation Expenditures
Operasional Grup saat ini dan di masa depan The operations of the Group had been, and may in the
terpengaruh dari waktu ke waktu oleh perubahan future be, affected from time to time to varying
regulasi tentang lingkungan. Kebijakan Grup adalah degrees by changes in environmental regulations. The
untuk memenuhi dan bila memungkinkan melebihi Group’s policy is to meet or, if possible, surpass the
persyaratan yang ditentukan oleh regulasi yang requirements of all applicable regulations issued by
dikeluarkan Pemerintah berdasarkan Peraturan the Government according to the Regulation of
Menteri Energi dan Sumber Daya Mineral Republik Minister of Energy and Mineral Resources of the
Indonesia No. 7 Tahun 2014, dengan menggunakan Republic of Indonesia No. 7 Year 2014, by application
aplikasi yang terbukti secara teknis dan ekonomis of technically proven and economically feasible
dapat dilakukan. measures.
Biaya-biaya yang terkait dengan program reklamasi Expenditures that relate to ongoing environmental
dan lingkungan yang berjalan dibebankan ke laporan and reclamation programs are charged to the
laba rugi dan penghasilan komprehensif lain consolidated statement of profit or loss and other
konsolidasian saat terjadi atau dikapitalisasi dan comprehensive income as incurred, or capitalized and
disusutkan berdasarkan manfaat ekonomis di masa depreciated depending on their future economic
depan. benefits.
Restorasi, rehabilitasi, dan biaya lingkungan yang Restoration, rehabilitation, and environmental
terjadi saat tahap operasi produksi dibebankan sebagai expenditures to be incurred during the production
bagian dari biaya produksi. Cadangan jaminan phase of operations are charged as part of the cost of
reklamasi telah disusun sesuai dengan persyaratan production. A reclamation guarantee reserve has also
Pemerintah Indonesia. been set up in accordance with applicable Government
requirements in Indonesia.
Untuk masalah lingkungan yang mungkin tidak For environmental issues that may not involve the
memerlukan penghentian suatu aset, di mana Grup retirement of an asset, where the Group is a
merupakan pihak yang bertanggung jawab dan responsible party and it is determined that a liability
ditentukan bahwa ada liabilitas dan jumlahnya dapat exists and amounts can be quantified, the Group
ditentukan, maka Grup mencatat akrual untuk accrues for the estimated liability. In determining
liabilitas estimasi. Dalam menentukan apakah whether a liability exists in respect of such
terdapat liabilitas sehubungan dengan masalah environmental issues, the Group applies the criteria
lingkungan, maka Grup menerapkan kriteria for liability recognition under applicable accounting
pengakuan liabilitas berdasarkan standar akuntansi standards.
yang berlaku.
Page 25
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/22 Exhibit E/22
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
m. Provisi (Lanjutan) m. Provision (Continued)
Pengeluaran Biaya Lingkungan untuk Reklamasi Environmental and Reclamation Expenditures
(Lanjutan) (Continued)
Provisi ditelaah pada setiap tanggal laporan posisi Provisions are reviewed at each consolidated
keuangan konsolidasian dan disesuaikan untuk statement of financial position date and adjusted to
mencerminkan estimasi kini terbaik. Jika tidak reflect the current best estimate. If it is no longer
terdapat kemungkinan arus keluar sumber daya yang probable that an outflow of resources embodying
mengandung manfaat ekonomi untuk menyelesaikan economic benefits will be required to settle the
liabilitas tersebut, provisi tidak diakui. obligation, the provision is reversed.
n. Laba (Rugi) per Saham n. Earnings (Loss) per Share
Jumlah laba (rugi) neto per saham dasar dihitung Basic earnings (loss) per share are calculated by
dengan membagi laba (rugi) tahun berjalan yang dapat dividing net profit (loss) for the year attributable to
diatribusikan kepada pemilik entitas induk dengan ordinary equity holders of the parent by the weighted
rata-rata tertimbang jumlah saham biasa yang beredar average number of ordinary shares outstanding
pada tahun yang bersangkutan. during the year.
Laba (rugi) per saham dilusi dihitung dengan membagi Diluted earnings (loss) per share amounts are
laba periode berjalan yang dapat diatribusikan kepada calculated by dividing the net profit attributable to
pemilik entitas induk (setelah disesuaikan dengan ordinary equity holders of the parent (after adjusting
bunga atas saham preferen yang dapat dikonversi) for interest on the convertible preference shares) by
dengan jumlah rata-rata tertimbang saham yang the weighted average number of ordinary shares
beredar selama periode ditambah jumlah saham rata- outstanding during the year plus the weighted
rata tertimbang yang akan diterbitkan pada saat average number of ordinary shares that would be
pengkonversian semua instrumen berpotensi saham issued on conversion of all the dilutive potential
biasa yang bersifat dilutif menjadi saham biasa. ordinary shares into ordinary shares.
o. Modal Saham o. Share Capital
Instrumen keuangan yang diterbitkan oleh Perusahaan Financial instruments issued by the Company are
diklasifikasikan sebagai ekuitas Ketika instrumen classified as equity only to the extent that they do
keuangan tersebut tidak memenuhi definisi aset atau not meet the definition of financial liability or
liabilitas keuangan. Saham biasa yang dimiliki financial asset. The Company’s ordinary shares are
Perusahaan diklasifikasikan sebagai instrumen ekuitas. classified as equity instrument.
Ketika entitas Grup membeli modal saham ekuitas Where any Group Group purchases the Group’s equity
Grup (saham treasuri), imbalan yang dibayar, termasuk share capital (treasury shares), the consideration
biaya tambahan yang secara langsung dapat paid, including any directly attributable incremental
diatribusikan (dikurangi pajak penghasilan) costs (net of income taxes) is deducted from equity
dikurangkan dari ekuitas yang diatribusikan kepada attributable to the Group’s equity holders until the
pemilik ekuitas entitas sampai saham tersebut shares are cancelled or reissued. Where such ordinary
dibatalkan atau diterbitkan kembali. Ketika saham shares are subsequently reissued, any consideration
biasa tersebut selanjutnya diterbitkan kembali, received, net of any directly attributable
imbalan yang diterima, dikurangi biaya tambahan incremental transaction costs and the related income
transaksi yang terkait dan dampak pajak penghasilan tax effect, is included in equity attributable to the
yang terkait dimasukkan pada ekuitas yang dapat Group’s equity holders.
diatribusikan kepada pemilik ekuitas Grup.
p. Dividen p. Dividends
Pembagian dividen kepada para pemegang saham Grup Dividend distribution to the Group’s shareholders is
diakui sebagai liabilitas dalam laporan keuangan recognized as a liability in the consolidated financial
konsolidasian pada periode ketika dividen tersebut statements in the period in which the dividends are
disetujui oleh para pemegang saham Grup. approved by the Group’s shareholders.
Page 26
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/23 Exhibit E/23
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
q. Transaksi dengan Pihak-pihak Berelasi q. Transaction with Related Parties
Sesuai dengan PSAK No.224 tentang “Pengungkapan In accordance with PSAK No. 224 in “Related Parties
Pihak-pihak Berelasi”, pihak dianggap berelasi dengan Disclosures”, parties are considered to be related
Grup jika salah satu pihak memiliki kemampuan untuk with the Group if one party has the ability to control
mengendalikan (dengan cara kepemilikan langsung (through ownership, directly or indirectly) or
maupun tidak langsung) atau mempunyai pengaruh exercise significant influence (through participation
signifikan (dengan cara partisipasi dalam kebijakan in the financial and operating policies) over the other
keuangan dan operasional) terhadap pihak lain dalam party in making financial and operating decisions.
pengambilan keputusan kebijakan keuangan dan
operasional.
r. Penurunan Nilai Aset Nonkeuangan r. Impairment of Non-financial Assets
Aset tetap dan aset tidak lancar lainnya, selain Fixed assets and other non-current assets, other than
goodwill, ditelaah untuk mengetahui apakah telah goodwill, are reviewed for impairment whenever
terjadi penurunan nilai bilamana terdapat kejadian events or changes in circumstances indicate that the
atau perubahan keadaan yang mengindikasikan bahwa carrying amount may not be recoverable. An
nilai tercatat aset tersebut tidak dapat diperoleh impairment loss is recognized for the amount by
kembali. Kerugian akibat penurunan nilai diakui which the carrying amount of the asset exceeds its
sebesar selisih antara nilai tercatat aset dengan nilai recoverable amount.
yang dapat diperoleh kembali dari aset tersebut.
Nilai yang dapat diperoleh kembali atas sebuah aset Recoverable amount of an asset is the higher of its
adalah nilai yang lebih tinggi antara nilai wajar fair value less costs of disposal and its value in use.
dikurangi biaya pelepasan dan nilai pakai. Dalam For the purpose of assessing impairment, assets are
rangka mengukur penurunan nilai, aset dikelompokkan grouped at the lowest levels for which there are
hingga unit terkecil yang menghasilkan arus kas separately identifiable cash flows.
terpisah.
Setiap tanggal pelaporan, aset nonkeuangan selain At each reporting date, non-financial assets, other
goodwill, yang telah mengalami penurunan nilai than goodwill, that suffered impairment are
ditelaah untuk menentukan apakah terdapat reviewed for possible reversal of the impairment.
kemungkinan pemulihan penurunan nilai. Jika terjadi Recoverable amount is immediately recognized in
pemulihan penurunan nilai, maka langsung diakui di profit or loss, but not in excess of any accumulated
laba rugi, tetapi tidak boleh melebihi akumulasi rugi impairment loss previously recognized.
penurunan nilai yang telah diakui sebelumnya.
s. Liabilitas Imbalan Pascakerja s. Post-employment Benefits Liabilities
Grup mengakui liabilitas imbalan pascakerja kepada The Group recognizes post-employment benefit
karyawan sesuai dengan ketentuan minimum di dalam liabilities to its employees in accordance with the
Peraturan Pemerintah No. 35 Tahun 2021 yang minimum requirement in the Government Regulation
mengatur mengenai pelaksanaan dari Undang-Undang No. 35 Year 2021 which regulates the implementation
No. 11 Tahun 2020 tentang “Cipta Kerja” yang telah of Law No. 11 Year 2020 on “Job Creation” which has
diganti dengan Undang-Undang No. 6 Tahun 2023 been replaced by Law No. 6 Year 2023 on “Stipulation
tentang “Penetapan Peraturan Pemerintah Pengganti of Government Regulation in Lieu of Law No. 2 Year
Undang-Undang No. 2 Tahun 2022 tentang Cipta Kerja 2022 on Job Creation into Law”.
menjadi Undang-Undang”.
Seluruh pengukuran kembali, terdiri atas keuntungan All remeasurements, comprising of actuarial gains
dan kerugian aktuarial dan hasil atas aset program and losses, and the return of plan assets (excluding
(tidak termasuk bunga neto) diakui langsung melalui net interest) are recognized immediately through
penghasilan komprehensif lain dengan tujuan agar aset other comprehensive income in order for the net
atau kewajiban pensiun neto diakui dalam laporan pension asset or liability recognized in the
posisi keuangan konsolidasian untuk mencerminkan consolidated statement of financial position to
nilai penuh dari defisit dan surplus program. reflect the full value of the plan deficit and surplus.
Pengukuran kembali tidak mereklasifikasi laba atau Remeasurements are not reclassified to profit or loss
rugi pada periode berikutnya. in subsequent periods.
Page 27
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/24 Exhibit E/24
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
s. Liabilitas Imbalan Pascakerja (Lanjutan) s. Post-employment Benefits Liabilities (Continued)
Seluruh biaya jasa lalu diakui pada saat yang lebih dulu All past service costs are recognized at the earliest of
antara ketika amendemen or kurtailmen terjadi atau when the amendment or curtailment occurs and when
ketika biaya restrukturisasi atau pemutusan hubungan the related restructuring or termination costs are
kerja diakui. recognized.
Bunga neto dihitung dengan menggunakan tingkat Net interest is calculated by applying the discount
diskonto terhadap liabilitas atau aset imbalan pasti rate to the net defined benefit liability or asset.
neto. Biaya jasa terdiri dari biaya jasa kini dan biaya Service cost comprise current service costs and past
jasa lalu, keuntungan dan kerugian kurtailmen dan service cost, gains and losses on curtailments and
penyelesaian tidak rutin, jika ada. Beban atau non-routine settlements, if any. Net interest expense
penghasilan bunga neto, dan biaya jasa diakui dalam or income and service costs are recognized in profit
laba atau rugi. or loss.
Liabilitas tersebut diestimasi berdasarkan perhitungan The liability is estimated based on an independent
aktuari independen dengan menggunakan “Projected actuarial calculation using the “Projected Unit
Unit Credit”. Credit” method.
t. Pengakuan Pendapatan dan Beban t. Revenues and Expenses Recognition
Pengakuan pendapatan harus memenuhi lima langkah Revenue recognition to fulfill five steps of
analisa sebagai berikut: assessment:
1) Mengindentifikasi kontrak dengan pelanggan, 1) Identify contracts with customers with certain
dengan kriteria sebagai berikut: criteria as follows:
- Kontrak telah disetujui oleh pihak-pihak terkait - The contract has been agreed by the parties
dalam kontrak; involved in the contract;
- Grup bisa mengidentifikasi hak dari pihak-pihak - The Group can identify the rights of relevant
terkait dan jangka waktu pembayaran dari parties and the term of payment for the goods
barang atau jasa yang akan dialihkan; or services to be transferred;
- Kontrak memiliki substansi komersial; dan - The contract has commercial substance; and
- Besar kemungkinan Grup akan menerima - It is probable that the Group will receive
imbalan atas barang atau jasa yang dialihkan. benefits for the goods or services transferred.
2) Mengidentifikasi kewajiban pelaksanaan dalam 2) Identify the performance obligations in the
kontrak, untuk menyerahkan barang atau jasa yang contract, to transfer distinctive goods or services
memiliki karakteristik yang berbeda ke pelanggan. to the customer.
3) Menentukan harga transaksi, setelah dikurangi 3) Determine the transaction price, net of discounts,
diskon, retur, insentif penjualan, pajak penjualan returns, sales incentives, luxury sales tax, value
barang mewah, pajak pertambahan nilai dan added tax and export duty, which an entity
pungutan ekspor, yang berhak diperoleh suatu expects to be entitled in exchange for transferring
entitas sebagai kompensasi atas diserahkannya promised goods or services to a customer.
barang atau jasa yang dijanjikan ke pelanggan.
4) Mengalokasikan harga transaksi kepada setiap 4) Allocate the transaction price to each
kewajiban pelaksanaan dengan menggunakan dasar performance obligation on the basis of the selling
harga jual dari setiap barang atau jasa yang prices of each goods or services promised in the
dijanjikan di kontrak. contract.
5) Mengakui pendapatan ketika kewajiban 5) Recognise revenue when performance obligation is
pelaksanaan telah dipenuhi (sepanjang waktu atau satisfied (over time or at a point in time).
pada suatu waktu tertentu).
Kewajiban pelaksanaan dapat dipenuhi: Performance obligation may be satisfied:
a. Pada suatu titik waktu (umumnya janji untuk a. At a point in time (typically for promises to
menyerahkan barang ke pelanggan); atau transfer goods to a customer); or
b. Suatu periode waktu (umumnya janji untuk b. Over time (typically for promises to transfer
menyerahkan jasa ke pelanggan). services to a customer).
Page 28
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/25 Exhibit E/25
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
t. Pengakuan Pendapatan dan Beban (Lanjutan) t. Revenues and Expenses Recognition (Continued)
Penjualan Batu Bara: Sales of Coals:
Pendapatan penjualan diakui pada setiap penjualan Sales revenue is recognized by each individual,
individu, kontrol beralih ke pelanggan pada saat batu control passes to the customers and sales revenue is
bara sampai di pelabuhan tujuan dan pendapatan recognized when handover of coal is at the
penjualan diakui ketika serah terima batu bara di destination port or customer port.
pelabuhan tujuan.
Grup menjual batu bara dengan syarat Cost, Insurance The Group sells its coal products on Cost, Insurance
dan Freight (CIF), di mana berdasarkan perjanjian and Freight (“CIF”), where based on the sales
penjualan, kepemilikan dan risiko kerugian atas batu agreement, ownership and losses on coal will remain
bara akan tetap berada pada Grup sampai batu bara with the Group until the coal passes the unloading
melewati pelabuhan bongkar. Dalam kondisi ini, Grup port. For this term there is only one performance
menganggap bahwa biaya asuransi dan pengangkutan obligation, being for provision of product at the point
bukan merupakan kewajiban kinerja terpisah where control passes. In this condition, the Group
melainkan satu kesatuan dengan kewajiban kinerja considers that the insurance and freight costs are not
dengan penjualan batu bara dikarenakan kontrol atas separate performance obligations but one
persediaan batu bara berpindah ke pembeli pada saat performance obligation with the sale of coal due to
batu bara tersebut sudah sampai di pelabuhan tujuan. the control over coal supplies passing to the buyer
Oleh karena itu Grup tidak memiliki kewajiban kinerja when the coal has arrived at the destination port.
terpisah untuk jasa pengangkutan dan asuransi yang Accordingly, the Group does not have any separate
disediakan. performance obligations for the transportation and
insurance services provided.
Pendapatan PLTU diakui ketika listrik yang dihasilkan Revenues from PLTU are recognized when the
telah dikirimkan ke pelanggan. electricity output is delivered to the customers.
Pendapatan jasa pemasaran diakui setiap akhir tahun Marketing service revenue is recognized at the end of
atas pemasaran batu bara yang dijual oleh pihak year for the marketing coal by third parties.
ketiga.
Pendapatan pengelolaan manajemen diakui setiap Management cooperation revenue is recognized at
akhir tahun atas pengelolaan dan pengawasan the end of year for operational, financial
operasional serta keuangan manajemen. management and supervision activities.
Beban diakui pada saat terjadinya (basis akrual). Expenses are recognized as incurred (accrual basis).
u. Pajak Penghasilan u. Income Tax
Beban pajak terdiri dari pajak kini dan tangguhan. Income tax expense comprises current and deferred
Beban pajak diakui dalam laporan laba rugi dan tax. Income tax expense is recognized in the
penghasilan komprehensif lain konsolidasian kecuali consolidated statement of profit or loss and other
untuk transaksi yang berhubungan dengan transaksi comprehensive income except to the extent that it
diakui langsung ke ekuitas, dalam hal ini diakui sebagai relates to items recognized directly in equity, in
penghaslian komprehensif lain. which case it is recognized in other comprehensive
income.
Pajak Kini Current Tax
Beban pajak kini dihitung dengan menggunakan tarif Current tax expense is calculated using tax rates that
pajak yang berlaku pada tanggal pelaporan keuangan, have been enacted or substantively enacted at the
dan ditetapkan berdasarkan taksiran laba kena pajak end of the reporting period, and is provided based on
tahun berjalan. Manajemen secara periodik the estimated taxable income for the year.
mengevaluasi posisi yang dilaporkan di Surat Management periodically evaluates positions taken in
Pemberitahuan Tahunan (SPT) sehubungan dengan tax returns with respect to situations in which
situasi di mana aturan pajak yang berlaku applicable tax regulation is subject to interpretation.
membutuhkan interpretasi. Jika perlu, manajemen It establishes provision where appropriate on the
menentukan provisi berdasarkan jumlah yang basis of amounts expected to be paid to the tax
diharapkan akan dibayar kepada otoritas pajak. authorities.
Page 29
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/26 Exhibit E/26
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
u. Pajak Penghasilan (Lanjutan) u. Income Tax (Continued)
Pajak Kini (Lanjutan) Current Tax (Continued)
Kekurangan atau kelebihan pembayaran pajak Underpayment or overpayment of corporate income
penghasilan badan dicatat sebagai bagian dari beban tax is presented as part of current income tax
pajak kini dalam laporan laba rugi dan penghasilan expense in the consolidated statement of profit or
komprehensif lain konsolidasian. loss and other comprehensive income.
Koreksi terhadap liabilitas perpajakan diakui pada saat Amendments to tax obligations are recorded when a
surat ketetapan pajak diterima. Jika Grup mengajukan tax assessment letter is received. If the Group files
keberatan, Grup mempertimbangkan apakah besar an appeal, the Group considers whether it is probable
kemungkinan otoritas pajak akan menerima keberatan that a taxation authority will accept the appeal and
tersebut dan merefleksikan dampaknya terhadap reflect its effect on the Group’s tax obligations.
liabilitas perpajakan Grup.
Pajak Final Final Tax
Grup dikenakan pajak final sesuai dengan Undang- The Group is taxed with the final tax rate according
Undang perpajakan di Indonesia atas kegiatan to the tax regulations on its business operations.
usahanya.
Peraturan perpajakan di Indonesia mengatur beberapa Tax regulation in Indonesia determined that certain
jenis penghasilan dikenakan pajak yang bersifat final. taxable income is subjected to final tax. Final tax
Pajak final yang dikenakan atas nilai bruto transaksi applied to the gross value of transactions is applied
tetap dikenakan walaupun atas transaksi tersebut even when the parties carrying the transaction
pelaku mengalami kerugian. recognize losses.
Pajak Tangguhan Deferred Tax
Pajak tangguhan diukur dengan metode liabilitas atas Deferred tax is provided using the liability method on
beda waktu pada tanggal pelaporan antara dasar temporary differences at the reporting date between
pengenaan pajak untuk aset dan liabilitas dengan nilai the tax bases of assets and liabilities and their
tercatatnya untuk tujuan pelaporan keuangan. carrying amounts for financial reporting purposes.
Liabilitas pajak tangguhan diakui untuk semua Deferred tax liabilities are recognized for all taxable
perbedaan temporer kena pajak dengan beberapa temporary differences with certain exceptions.
pengecualian. Aset pajak tangguhan diakui untuk Deferred tax assets are recognized for deductible
perbedaan temporer yang boleh dikurangkan dan rugi temporary differences and tax losses carry-forward
fiskal apabila terdapat kemungkinan besar bahwa to the extent that it is probable that taxable income
jumlah laba kena pajak pada masa mendatang akan will be available in future years against which the
memadai untuk mengkompensasi perbedaan temporer deductible temporary differences and tax losses
dan rugi fiskal. carry-forward can be utilized.
Jumlah tercatat aset pajak tangguhan dikaji ulang The carrying amount of a deferred tax asset is
pada akhir periode pelaporan, dan mengurangi jumlah reviewed at each reporting date and reduced to the
tercatat jika kemungkinan besar laba kena pajak tidak extent that it is no longer probable that sufficient
lagi tersedia dalam jumlah yang memadai untuk taxable income will be available to allow all or part
mengkompensasi sebagian atau seluruh aset pajak of the benefit of that deferred tax asset to be
tangguhan. Aset pajak tangguhan yang belum diakui utilized. Unrecognized deferred tax assets are
dinilai kembali pada setiap akhir periode pelaporan reassessed at each reporting date and are recognized
dan diakui sepanjang kemungkinan besar laba kena to the extent that it has become probable that future
pajak mendatang akan memungkinkan aset pajak taxable income will allow the deferred tax assets to
tangguhan tersedia untuk dipulihkan. be recovered.
Page 30
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/27 Exhibit E/27
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
2. IKHTISAR KEBIJAKAN AKUNTANSI MATERIAL (Lanjutan) 2. SUMMARY OF MATERIAL ACCOUNTING POLICIES
(Continued)
u. Pajak Penghasilan (Lanjutan) u. Income Tax (Continued)
Pajak Tangguhan (Lanjutan) Deferred Tax (Continued)
Aset dan liabilitas pajak tangguhan dihitung Deferred tax assets and liabilities are measured at
berdasarkan tarif yang akan dikenakan pada periode the tax rates that are expected to apply to the period
saat aset direalisasikan atau liabilitas tersebut when the asset is realized or the liability is settled,
diselesaikan, berdasarkan undang-undang pajak yang based on tax laws that have been enacted or
berlaku atau berlaku secara substantif pada akhir substantively enacted at the end of the reporting
periode laporan keuangan. Pengaruh pajak terkait period. The related tax effects of the provisions for
dengan penyisihan dan/atau pemulihan semua and/or reversals of all temporary differences during
perbedaan temporer selama tahun berjalan, termasuk the year, including the effect of change in tax rates,
pengaruh perubahan tarif pajak, dikreditkan atau are credited or charged to current period operations,
dibebankan pada periode operasi berjalan, untuk except to the extent that they relate to items
transaksi-transaksi yang sebelumnya telah langsung previously charged or credited to equity.
dibebankan atau dikreditkan ke ekuitas.
Aset dan liabilitas pajak tangguhan disajikan secara Deferred tax assets and liabilities are offset when a
saling hapus saat hak yang dapat dipaksakan secara legally enforceable right exists to offset current tax
hukum ada untuk saling hapus aset pajak kini dan assets against current tax liabilities, or the deferred
liabilitas pajak kini, atau aset pajak tangguhan dan tax assets and the deferred tax liabilities relate to
liabilitas pajak tangguhan berkaitan dengan entitas the same taxable entity, or the Group intends to
kena pajak yang sama, atau Grup bermaksud untuk settle its current assets and liabilities on a net basis.
menyelesaikan aset dan liabilitas pajak kini dengan
dasar neto.
v. Informasi Segmen v. Segment Information
Pendapatan, beban, laba (rugi) neto, aset dan liabilitas Segment revenue, expenses, net income (loss), assets
segmen termasuk item-item yang dapat diatribusikan and liabilities include items directly attributable to
langsung kepada suatu segmen serta hal-hal yang dapat a segment as well as those that can be allocated on a
dialokasikan dengan dasar yang sesuai kepada segmen reasonable basis to that segment. Segments are
tersebut. Segmen ditentukan sebelum saldo transaksi determined before intra-group transaction balances
antar Grup dieliminasi. are eliminated.
Segmen operasi dilaporkan dengan cara yang konsisten Operating segments are reported in a manner
dengan pelaporan internal yang diberikan kepada consistent with the internal reporting provided to the
pengambil keputusan operasional. Direksi merupakan chief operating decision-maker. The Directors, who is
pengambil keputusan operasional yang bertanggung responsible for allocating resources and assessing
jawab untuk mengalokasikan sumber daya dan menilai performance of the operating segments and making
kinerja segmen operasi dan membuat keputusan strategic decisions.
strategis.
3. PERTIMBANGAN, ESTIMASI DAN ASUMSI AKUNTANSI YANG 3. MATERIAL ACCOUNTING JUDGMENTS, ESTIMATES AND
MATERIAL ASSUMPTIONS
Penyusunan laporan keuangan konsolidasian Grup The preparation of the Group’s consolidated financial
mengharuskan manajemen untuk membuat pertimbangan, statements requires management to make judgments,
estimasi dan asumsi yang memengaruhi jumlah yang estimates and assumptions that affect the reported
dilaporkan dan pengungkapan yang terkait, pada akhir amounts herein, and the related disclosures, at the end
periode pelaporan. Ketidakpastian mengenai asumsi dan of the reporting period. However, uncertainty about
estimasi tersebut dapat mengakibatkan penyesuaian these assumptions and estimates could result in outcomes
material terhadap nilai tercatat pada aset dan liabilitas that require a material adjustment to the carrying
dalam periode pelaporan berikutnya. amount of the asset or liability affected in future
periods.
Page 31
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/28 Exhibit E/28
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
3. PERTIMBANGAN, ESTIMASI DAN ASUMSI AKUNTANSI YANG 3. MATERIAL ACCOUNTINGS JUDGMENTS, ESTIMATES AND
MATERIAL (Lanjutan) ASSUMPTIONS (Continued)
a. Pertimbangan a. Judgments
Dalam proses penerapan kebijakan akuntansi Grup, In the process of applying the Group’s accounting
manajemen telah membuat keputusan berikut, yang policies, management has made the following
memiliki pengaruh paling signifikan terhadap jumlah judgments, which have the most significant effect on
yang diakui dalam laporan keuangan konsolidasian: the amounts recognized in the consolidated financial
statements:
Klasifikasi Instrumen Keuangan Classification of Financial Instruments
Grup menetapkan klasifikasi atas aset dan liabilitas The Group determines the classifications of certain
tertentu sebagai aset keuangan dan liabilitas keuangan assets and liabilities as financial assets and financial
berdasarkan bisnis model aset keuangan dan arus kas liabilities based on the business model in which a
kontraktual yang ditetapkan PSAK No. 109 dipenuhi. financial asset is managed and its contractual cash
Dengan demikian, aset keuangan dan liabilitas flows characteristic as set forth in PSAK No. 109.
keuangan diakui sesuai dengan kebijakan akuntansi Accordingly, the financial assets and financial
Grup seperti diungkapkan pada Catatan 2 atas Laporan liabilities are accounted for in accordance with the
Keuangan Konsolidasian. Group accounting policies disclosed in Note 2 to the
Consolidated Financial Statements.
Penentuan Mata Uang Fungsional Determination of Functional Currency
Mata uang fungsional Grup adalah mata uang dari The functional currency of the Group is the currency
lingkungan ekonomi primer di mana entitas beroperasi. of the primary economic environment in which each
Mata uang tersebut adalah mata uang yang entity operates. It is the currency that mainly
memengaruhi pendapatan dan beban dari jasa yang influences the revenues and cost of revenues. Based
diberikan. Berdasarkan penilaian manajemen Grup, on the Group’s management assessment, the Group’s
mata uang fungsional Grup adalah Rupiah. functional currency is in Rupiah.
Provisi untuk Kerugian Penurunan Nilai atas Aset Provision for Impairment of Financial Assets
Keuangan
Penerapan PSAK No. 109 menyebabkan perubahan The implementation of PSAK No. 109 resulted in a
terhadap penilaian signifikan estimasi dan asumsi change to the assessment of the significant
akuntansi terhadap provisi untuk kerugian penurunan accounting estimates and judgments related to
nilai atas aset keuangan. Grup menerapkan provision for loss impairment of financial assets. The
pendekatan yang disederhanakan untuk mengukur Group applies a simplified approach to measure
kerugian kredit ekspektasian yang menggunakan expected credit losses which uses a lifetime expected
cadangan kerugian kredit ekspektasian seumur hidup loss allowance for all trade receivables, other
untuk seluruh piutang usaha, piutang lain-lain dan uang receivables and financial advances.
muka keuangan.
Dalam penentuan kerugian kredit ekspektasian, In determining expected credit losses, management is
manajemen diharuskan untuk menggunakan required to exercise judgment in defining what is
pertimbangan dalam mendefinisikan hal apa yang considered to be a significant increase in credit risk
dianggap sebagai kenaikan risiko kredit yang signifikan and in making assumptions and estimates to
dan dalam pembuatan asumsi dan estimasi, untuk incorporate relevant information about past events,
menghubungkan informasi yang relevan tentang current conditions and forecasts of economic
kejadian masa lalu, kondisi terkini dan perkiraan atas conditions. Judgment has been applied in
kondisi ekonomi. Pertimbangan diaplikasikan dalam determining the lifetime and point of initial
menentukan periode seumur hidup dan titik pengakuan recognition of trade receivables, other receivables
awal piutang usaha, piutang lain-lain dan uang muka and financial advances.
keuangan.
Page 32
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/29 Exhibit E/29
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
3. PERTIMBANGAN, ESTIMASI DAN ASUMSI AKUNTANSI YANG 3. MATERIAL ACCOUNTINGS JUDGMENTS, ESTIMATES AND
MATERIAL (Lanjutan) ASSUMPTIONS (Continued)
a. Pertimbangan (Lanjutan) a. Judgments (Continued)
Provisi untuk Kerugian Penurunan Nilai atas Aset Provision for Impairment of Financial Assets
Keuangan (Lanjutan) (Continued)
Tingkat provisi yang spesifik dievaluasi oleh The level of a specific provision is evaluated by
manajemen dengan dasar faktor-faktor yang management on the basis of factors that affect the
memengaruhi tingkat tertagihnya akun-akun tersebut. collectibility of the accounts. In these cases, the
Dalam kasus ini, Grup menggunakan pertimbangan Group uses judgment based on the best available
berdasarkan fakta dan kondisi terbaik yang tersedia facts and circumstances, including but not limited to,
meliputi tetapi tidak terbatas pada jangka waktu the length of the Group relationship with the
hubungan Grup dengan pelanggan dan status kredit customers and customers’ credit status based on
pelanggan berdasarkan laporan dari pihak ketiga dan third-party credit reports and known market factors,
faktor-faktor pasar yang telah diketahui, untuk to record specific reserves for customers against
mencatat pencadangan spesifik untuk pelanggan amounts due in order to reduce the Group trade
terhadap jumlah jatuh tempo untuk mengurangi receivables, other receivabes and financial advances
piutang usaha, piutang lain-lain dan uang muka to amounts that it expects to collect.
keuangan Grup menjadi jumlah yang diharapkan
tertagih.
Pencadangan secara spesifik ini dievaluasi kembali dan These specific reserves are re-evaluated and
disesuaikan jika terdapat informasi tambahan yang adjusted as additional information received affects
diterima yang memengaruhi jumlah yang the amounts estimated.
diestimasikan.
Kelangsungan Usaha Going Concern
Manajemen Grup telah melakukan penilaian terhadap The Group’s management has made an assessment of
kemampuan Grup untuk mempertahankan the Group’s ability to continue as a going concern and
kelangsungan usaha dan menilai keyakinan bahwa is satisfied that the Group has the resources to
Grup memiliki sumber daya untuk melanjutkan bisnis continue in business for the foreseeable future.
di masa mendatang.
Selain itu, manajemen menilai tidak adanya Furthermore, the management is not aware of any
ketidakpastian material yang dapat menimbulkan material uncertainties that may cast significant
keraguan signifikan terhadap kemampuan Grup untuk doubt upon the Group’s ability to continue as a going
mempertahankan kelangsungan usahanya. Oleh karena concern. Therefore, the consolidated financial
itu, laporan keuangan konsolidasian terus disusun atas statements continue to be prepared on a going
basis kelangsungan usaha. concern basis.
Penurunan Nilai atas Aset Tetap Impairment of Fixed Assets
Jumlah nilai yang dapat dipulihkan kembali dari The recoverable amount of a cash-generating asset
sebuah aset atau kelompok aset penghasil kas diukur or group of assets is measured at value in use. The
berdasarkan nilai pakai. Penentuan nilai pakai determination of value in use requires management
mewajibkan manajemen untuk membuat estimasi dan to make estimates and assumptions regarding
asumsi atas tingkat produksi yang diharapkan, volume expected production levels, sales volumes, coal
penjualan, harga batu bara (mempertimbangkan harga prices (considering current and historical prices,
saat ini dan harga masa lalu, tren harga dan faktor- price trends and related factors), operating costs and
faktor terkait), biaya operasi dan tingkat diskonto di discount rate. These estimates and assumptions are
masa depan. Estimasi dan asumsi ini terpapar risiko subject to risk and uncertainty, and hence there is a
dan ketidakpastian, sehingga terdapat kemungkinan possibility that changes in circumstances will alter
perubahan situasi yang dapat mengubah proyeksi ini, these projections, which may have an impact on the
sehingga dapat memengaruhi nilai aset yang dapat recoverable amount of the assets. In such
dipulihkan kembali. Dalam keadaan seperti itu, circumstances, some or all of the carrying values of
sebagian atau seluruh nilai tercatat aset mungkin akan the assets may be further impaired or the
mengalami penurunan nilai lebih lanjut atau terjadi impairment charges may be reduced with the impact
pengurangan rugi penurunan nilai yang dampaknya being recorded in profit or loss.
akan dicatat dalam laba rugi.
Page 33
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/30 Exhibit E/30
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
3. PERTIMBANGAN, ESTIMASI DAN ASUMSI AKUNTANSI YANG 3. MATERIAL ACCOUNTINGS JUDGMENTS, ESTIMATES AND
MATERIAL (Lanjutan) ASSUMPTIONS (Continued)
a. Pertimbangan (Lanjutan) a. Judgments (Continued)
Penurunan Nilai atas Aset Tetap (Lanjutan) Impairment of Fixed Assets (Continued)
Asumsi utama masa depan dan ketidakpastian sumber The key assumptions concerning the future and other
estimasi utama yang lain pada tanggal pelaporan yang key sources of estimation uncertainty at the
memiliki risiko signifikan bagi penyesuaian yang reporting date, that have a significant risk of causing
material terhadap nilai tercatat aset dan liabilitas a material adjustment to the carrying amounts of
untuk tahun berikutnya diungkapkan di bawah ini. assets and liabilities within the next financial year,
Grup mendasarkan asumsi dan estimasi pada are described below. The Group based its
parameter yang tersedia pada saat laporan keuangan assumptions and estimates on parameters available
konsolidasian disusun. Asumsi dan situasi mengenai when the consolidated financial statements were
perkembangan masa depan mungkin berubah akibat prepared. Existing circumstances and assumptions
perubahan pasar atau situasi di luar kendali Grup. about future developments however, may change
Perubahan tersebut dicerminkan dalam asumsi terkait due to market changes or circumstances arising
pada saat terjadinya. beyond the control of the Group. Such changes are
reflected in the assumptions when they occur.
b. Estimasi dan Asumsi b. Estimates and Assumptions
Pajak Penghasilan Income Tax
Pertimbangan yang signifikan dibutuhkan untuk Significant judgment is required in determining the
menentukan jumlah pajak penghasilan. Terdapat provision for income taxes. There are many
banyak transaksi dan perhitungan yang mengakibatkan transactions and calculations for which the ultimate
ketidakpastian penentuan jumlah pajak penghasilan. tax determination is uncertain. Where the final tax
Jika hasil pemeriksaan pajak berbeda dengan jumlah outcome of these matters is different from the
yang sebelumnya telah dibukukan, maka selisih amounts that were initially recorded, such
tersebut akan berdampak terhadap aset dan liabilitas differences will have an impact on the current and
pajak kini dan tangguhan dalam periode di mana hasil deferred income tax assets and liabilities in the
pemeriksaan tersebut terjadi. period in which such determination is made.
Penyusutan Aset Tetap Depreciation of Fixed Assets
Biaya perolehan aset tetap disusutkan dengan The costs of fixed assets are depreciated on a
menggunakan metode garis lurus berdasarkan taksiran straight-line basis over their estimated useful lives.
masa manfaat ekonomisnya. Manajemen mengestimasi Management estimates the useful lives of these fixed
masa manfaat ekonomis aset tetap antara 4 sampai assets to be within 4 to 30 years. These are common
dengan 30 tahun. Ini adalah umur yang secara umum life expectancies applied in the industries where the
diharapkan dalam industri di mana Grup menjalankan Group conducts its business. Changes in the expected
bisnisnya. Perubahan tingkat pemakaian dan level of usage and technological development could
perkembangan teknologi dapat memengaruhi masa impact the economically useful lives and the residual
manfaat ekonomis dan nilai sisa aset dan karenanya values of these assets, and therefore future
biaya penyusutan masa depan mungkin direvisi. depreciation charges could be revised. Further
Penjelasan lebih rinci diungkapkan dalam Catatan 2k details are disclosed in Notes 2k and 9 to the
dan 9 atas Laporan Keuangan Konsolidasian. Consolidated Financial Statements.
Liabilitas Imbalan Pascakerja Post-employment Benefits Liabilities
Nilai kini kewajiban pensiun tergantung pada sejumlah The present value of the pension obligation depends
faktor yang ditentukan berdasarkan basis dari aktuaria on a number of factors that are determined on an
dengan menggunakan sejumlah asumsi. Asumsi yang actuarial basis using a number of assumptions. The
digunakan dalam menentukan biaya (penghasilan) assumptions used in determining the net cost
neto untuk pensiun termasuk tingkat diskonto, (income) for pensions include the discount rate,
kenaikan gaji di masa depan, perubahan remunerasi future salary increase, future remuneration changes,
masa depan, tingkat pengurangan karyawan, tingkat employee attrition rates, life expectancy and
harapan hidup dan periode sisa yang diharapkan dari expected remaining periods of service of employees.
masa aktif karyawan. Setiap perubahan dalam asumsi- Any changes in these assumptions will have an impact
asumsi ini akan berdampak pada nilai tercatat atas on the carrying amount of the pension obligation.
kewajiban pensiun.
Page 34
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/31 Exhibit E/31
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
3. PERTIMBANGAN, ESTIMASI DAN ASUMSI AKUNTANSI YANG 3. MATERIAL ACCOUNTINGS JUDGMENTS, ESTIMATES AND
MATERIAL (Lanjutan) ASSUMPTIONS (Continued)
b. Estimasi dan Asumsi (Lanjutan) b. Estimates and Assumptions (Continued)
Liabilitas Imbalan Pascakerja (Lanjutan) Post-employment Benefits Liabilities (Continued)
Grup menentukan tingkat diskonto yang sesuai pada The Group determines the appropriate discount rate
setiap akhir tahun. Tingkat suku bunga inilah yang at the end of each year. This is the interest rate that
digunakan untuk menentukan nilai kini dari estimasi should be used to determine the present value of
arus kas keluar masa depan yang akan dibutuhkan estimated future cash outflows expected to be
untuk memenuhi kewajiban pensiun. required to settle the pension obligation.
Dalam menentukan tingkat diskonto yang sesuai Grup In determining the appropriate discount rate, the
menggunakan tingkat suku bunga obligasi pemerintah, Group considers the interest rates of government
(dengan pertimbangan saat ini tidak ada pasar aktif bonds (considering there is no deep market for high
untuk obligasi pemerintah berkualitas tinggi) dalam quality Goverment bonds) that are denominated in
mata uang yang sama dengan mata uang imbalan yang the currency in which the benefits will be paid and
akan dibayarkan dan memiliki waktu jatuh tempo yang that have terms to maturity approximating the terms
kurang lebih sama dengan waktu jatuh tempo of the related pension obligation.
kewajiban pensiun yang bersangkutan.
Aset Pajak Tangguhan Deferred Tax Assets
Aset pajak tangguhan diakui atas seluruh perbedaan Deferred tax assets are recognized for all deductible
temporer yang dapat dikurangkan dan rugi fiskal yang temporary differences and unused fiscal losses, to
belum digunakan, sepanjang besar kemungkinannya the extent that it is probable that taxable profit will
bahwa penghasilan kena pajak akan tersedia sehingga be available against which the deductible temporary
perbedaan temporer dan rugi fiskal dapat digunakan. differences and losses can be utilized.
Estimasi signifikan oleh manajemen diharuskan dalam Significant management estimates are required to
menentukan jumlah aset pajak tangguhan yang dapat determine the amount of deferred tax assets that
diakui, berdasarkan saat penggunaan dan tingkat can be recognized, based upon the likely timing and
penghasilan kena pajak serta strategi perencanaan the level of future taxable profits together with
pajak masa depan. future tax planning strategies.
Cadangan Biaya Reklamasi Reserve for Reclamation Cost
Grup mengevaluasi jumlah beban cadangan reklamasi The Group evaluates the amount of reserve for
setiap tahun. Kebijakan manajemen adalah untuk reclamation cost each year. Management policy is to
memenuhi dan bila memungkinkan melebihi meet and where possible exceed the requirements
persyaratan yang ditentukan oleh regulasi yang prescribed by regulations issued by the Government,
dikeluarkan Pemerintah berdasarkan Peraturan according to Regulation of Ministry of Energy and
Menteri Energi dan Sumber Daya Mineral Republik Mineral Resources of Republic of Indonesia No. 7 Year
Indonesia No. 7 Tahun 2014. 2014.
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, As of 30 June 2026 and 31 December 2025, the reserve
cadangan biaya reklamasi diungkapkan pada Catatan for reclamation cost is disclosed in Note 23 to the
23 atas Laporan Keuangan Konsolidasian. Grup tidak Consolidated Financial Statements. Group will not
lagi mencatat (menghapus) cadangan biaya reklamasi recognize (write off) reserve for reclamation cost if
apabila Grup tidak lagi memiliki ijin tambang tersebut. Group does not have the mining license.
4. KAS DAN BANK 4. CASH ON HAND AND IN BANKS
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Kas 63.355 63.539 Cash on Hand
Bank Cash in Banks
Rupiah Rupiah
PT Bank Sinarmas Tbk 336.588.592 253.555.914 PT Bank Sinarmas Tbk
PT Bank Rakyat PT Bank Rakyat
Indonesia (Persero) Tbk 1.560.231 371.717 Indonesia (Persero) Tbk
PT Bank Negara PT Bank Negara
Indonesia (Persero) Tbk 85.626 30.963 Indonesia (Persero) Tbk
PT Bank Maybank Indonesia Tbk 8.100 8.310 PT Bank Maybank Indonesia Tbk
PT Bank Mandiri (Persero) Tbk - 925 PT Bank Mandiri (Persero) Tbk
Jumlah 338.305.904 254.031.368 Total
Page 35
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/32 Exhibit E/32
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
4. KAS DAN BANK (Lanjutan) 4. CASH ON HAND AND IN BANKS (Continued)
Suku bunga giro per tahun adalah sebagai berikut: The current accounts interest rate per year is as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Bank Cash in Banks
Rupiah 0,50% - 1,25% 0,50% - 1,25% Rupiah
Seluruh saldo kas dan bank ditempatkan pada pihak ketiga All cash on hand and in banks are placed with third parties
dan saldo pada bank merupakan giro bank. and balances in banks are current accounts.
Berdasarkan pendapat manajemen, tidak terdapat Based on management’s opinion, there are no restrictions
pembatasan kas dan bank Grup. Kas dan bank dapat ditarik on the use of the Group’s cash and banks. Cash and banks
setiap saat. can be withdrawn at any time.
5. PIUTANG USAHA - PIHAK KETIGA 5. TRADE RECEIVABLES - THIRD PARTIES
Rincian dari piutang usaha adalah sebagai berikut: The details of trade receivables are as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Difakturkan Billed
PT Borneo Inter Aero 196.942.015 196.942.015 PT Borneo Inter Aero
PT Bukit Intan Sedjati International 149.378.379 149.378.379 PT Bukit Intan Sedjati International
PT Permata Bintang Borneo 136.373.960 136.373.960 PT Permata Bintang Borneo
PT PLN Indonesia Power 133.776.102 - PT PLN Indonesia Power
PT PLN Nusantara Power 42.858.797 - PT PLN Nusantara Power
PT Borneo Guna Laksana 32.331.983 32.331.983 PT Borneo Guna Laksana
PT Energi Sinar Bara 27.551.631 28.467.736 PT Energi Sinar Bara
PT Kalimantan Prima Persada 22.107.137 22.107.137 PT Kalimantan Prima Persada
PT Trans Jaya Perkasa 19.035.319 19.035.319 PT Trans Jaya Perkasa
PT Rian Pratama Mandiri 8.556.050 8.556.050 PT Rian Pratama Mandiri
PT PLN (Persero) UIP3B Kalimantan 6.129.367 5.704.225 PT PLN (Persero) UIP3B Kalimantan
PT Indomarta Multi Mining 4.334.348 4.334.348 PT Indomarta Multi Mining
PT Oktasan Baruna Persada 3.826.969 3.826.969 PT Oktasan Baruna Persada
PT Milta Lintas Samudera 3.340.473 3.340.473 PT Milta Lintas Samudera
PT Mitra Hasrat Bersama 3.070.830 3.070.830 PT Mitra Hasrat Bersama
PT Mitra Cipta Multi Sukses 2.383.066 2.383.066 PT Mitra Cipta Multi Sukses
PT Cipta Prima Energi Indonesia 2.184.793 2.184.793 PT Cipta Prima Energi Indonesia
PT Rukuy Jaya Abadi 1.387.500 1.387.500 PT Rukuy Jaya Abadi
CV Mitra Bumi Sejahtera 1.322.112 1.322.112 CV Mitra Bumi Sejahtera
PT Pelayaran Sayusan Bahari 1.200.000 1.200.000 PT Pelayaran Sayusan Bahari
PT Cahaya Marhan Naya 1.097.056 1.097.056 PT Cahaya Marhan Naya
Lain-lain (masing-masing Others (each below
di bawah Rp 1.000.000) 5.656.595 5.656.595 Rp 1,000,000)
Subjumlah 804.844.482 628.700.546 Sub-total
Belum difakturkan Unbilled
PT PLN Indonesia Power 61.713.115 35.037.091 PT PLN Indonesia Power
PT PLN Nusantara Power 55.547.738 45.436.165 PT PLN Nusantara Power
Subjumlah 117.260.853 80.473.256 Sub-total
Jumlah 922.105.335 709.173.802 Total
Dikurangi: Less:
Cadangan kerugian penurunan nilai (594.528.585 ) (594.528.585 ) Allowance for impairment losses
Neto 327.576.750 114.645.217 Net
Page 36
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/33 Exhibit E/33
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
5. PIUTANG USAHA - PIHAK KETIGA (Lanjutan) 5. TRADE RECEIVABLES - THIRD PARTIES (Continued)
Analisa umur piutang usaha adalah sebagai berikut: The aging analysis of trade receivables is as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Belum jatuh tempo 168.052.717 82.239.038 Current
Telah jatuh tempo namun tidak
mengalami penurunan nilai: Past due but not yet impaired:
1 sampai 30 hari 157.585.481 30.205.171 1 to 30 days
31 sampai 60 hari 1.938.552 2.201.008 31 to 60 days
61 sampai 90 hari - - 61 to 90 days
Lebih dari 90 hari - - More than 90 days
Jatuh tempo dan mengalami
penurunan nilai 594.528.585 594.528.585 Past due and impaired
Jumlah 922.105.335 709.173.802 Total
Mutasi cadangan kerugian penurunan nilai piutang usaha The movements in allowance for impairment loss on
adalah sebagai berikut: trade receivables are as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Saldo awal 594.528.585 594.528.585 Beginning balance
Penyisihan periode berjalan - - Provision during the period
Saldo akhir 594.528.585 594.528.585 Ending balance
Pada tanggal 30 Juni 2026 dan 31 Desember 2025 seluruh As of 30 June 2026 and 31 December 2025, all the carrying
nilai tercatat piutang usaha Grup berdenominasi Rupiah. amount of the Group’s trade receivables were
denominated in Rupiah.
Manajemen berkeyakinan bahwa penurunan nilai telah Management believes that the allowance for impairment
dicadangkan dengan nilai yang cukup untuk menutup was adequate to cover possible losses that may arise
kemungkinan kerugian atas tidak tertagihnya piutang from the non-collection of trade receivables.
usaha.
Piutang usaha atas penjualan batu bara digunakan sebagai Trade receivables from coal sales are used as collateral
jaminan atas pinjaman yang diperoleh Perusahaan dari for loans obtained by the Company from PT Bank
PT Bank Sinarmas Tbk (Catatan 15) dan liabilitas keuangan Sinarmas Tbk (Note 15) and other financial liabilities
lainnya (Catatan 19). (Note 19).
6. PIUTANG LAIN-LAIN 6. OTHER RECEIVABLES
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Pihak ketiga Third parties
PT Banua Konstruksi Nusantara 234.215.000 234.215.000 PT Banua Konstruksi Nusantara
PT Truba Dewata Guna Prasada 44.887.000 44.887.000 PT Truba Dewata Guna Prasada
PT Trans Jaya Perkasa 7.414.331 7.414.331 PT Trans Jaya Perkasa
PT Cipta Prima Power 3.075.019 3.075.019 PT Cipta Prima Power
PT Daya Guna Laksana 1.155.000 1.155.000 PT Daya Guna Laksana
PT Multi Guna Laksana 606.000 11.657.523 PT Multi Guna Laksana
Lain-lain (masing-masing Others (each
di bawah Rp 1.000.000) 6.465.165 7.232.307 below Rp 1,000,000)
Subjumlah 297.817.515 309.636.180 Sub-total
Dikurangi: Less:
Cadangan kerugian penurunan nilai (297.817.515 ) (309.636.180 ) Allowance for impairment losses
Subjumlah - - Sub-total
Pihak berelasi (Catatan 28a) 62.213.343 72.329.552 Related parties (Note 28a)
Dikurangi: Less:
Cadangan kerugian penurunan nilai (62.213.343 ) (72.329.552 ) Allowance for impairment losses
Subjumlah - - Sub-total
Neto - - Net
Page 37
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/34 Exhibit E/34
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
6. PIUTANG LAIN-LAIN (Lanjutan) 6. OTHER RECEIVABLES (Continued)
Mutasi cadangan kerugian penurunan nilai piutang lain-lain The movements in allowance for impairment loss on
adalah sebagai berikut: other receivables are as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Saldo awal 381.965.732 381.467.732 Beginning balance
Penjualan entitas anak (Catatan 39) (21.934.874) - Sale of subsidiary (Note 39)
Penyisihan periode berjalan - 498.000 Provision for current period
Saldo akhir 360.030.858 381.965.732 Ending balance
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, As of 30 June 2026 and 31 December 2025, management
manajemen telah mencadangkan seluruh saldo piutang has reserved all other receivables balances to cover
lain-lain untuk menutup kerugian yang terjadi atas tidak possible losses from the non-collection of other
tertagihnya piutang lain-lain. receivables.
7. PERSEDIAAN 7. INVENTORIES
Rincian persediaan adalah sebagai berikut: The details of inventories are as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Persediaan batu bara dalam perjalanan 5.411.355 41.612.204 Coal inventory in transit
Persediaan batu bara PLTU 4.175.784 5.488.783 PLTU coal inventory
Jumlah 9.587.139 47.100.987 Total
Jumlah persediaan yang dibebankan ke beban Total inventories charged to cost of revenues amounted
pokok pendapatan masing-masing adalah sebesar to Rp 636,419,833 and Rp 576,000,238 for the
Rp 636.419.833 dan Rp 576.000.238 untuk periode yang period ended 30 June 2026 and 2025, respectively (Note
berakhir pada tanggal 30 Juni 2026 dan 2025 (Catatan 32). 32).
Persediaan dalam perjalanan telah diasuransikan terhadap Inventories in transit are insured against fire and other
risiko kebakaran dan risiko lainnya (all-risks) kepada risks (all-risks) to PT Asuransi Umum Mega with total
PT Asuransi Umum Mega dengan nilai pertanggungan coverage of Rp 70,000,000,000 (full amount) for Classed
masing-masing sebesar Rp 70.000.000.000 (nilai penuh) Mechanically Self Propelled Vessel and Rp 35,000,000,000
untuk Classed Mechanically Self Propelled Vessel dan Rp (full amount) for Unclassed Mechanical Self Propelled
35.000.000.000 (nilai penuh) untuk Unclassed Mechanical Vessel, Classed & Unclassed Steel Barge and Tug Boat as
Self Propelled Vessel, Classed & Unclassed Steel Barge and of 30 June 2026, and USD 4,000,000 (full amount) for
Tug Boat pada tanggal 30 Juni 2026, dan USD 4.000.000 Classed Vessel and USD 2,000,000 (full amount) for
(nilai penuh) untuk Classed Vessel dan USD 2.000.000 (nilai Unclassed Vessel, Classed and Unclassed Barge and Tug
penuh) untuk Unclassed Vessel, Classed dan Unclassed Boat and Barge Vessel as of 31 December 2025.
Barge dan Tug Boat dan Barge Vessel pada tanggal Management believes that the insurance amount is
31 Desember 2025. Manajemen berpendapat bahwa nilai adequate to cover possible losses.
pertanggungan tersebut cukup untuk menutup
kemungkinan kerugian.
Berdasarkan penelaahan terhadap kondisi fisik dan Based on the review of the physical condition and
perputaran persediaan pada 30 Juni 2026 dan turnover of the inventories as of 30 June 2026 and
31 Desember 2025, manajemen meyakini bahwa tidak ada 31 December 2025, the management believes that no
pembentukan cadangan kerugian penurunan nilai allowance for impairment losses of inventories is
persediaan yang dibutuhkan. necessary.
Page 38
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/35 Exhibit E/35
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
8. BIAYA DIBAYAR DI MUKA DAN UANG MUKA 8. PREPAID EXPENSES AND ADVANCE PAYMENTS
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Biaya dibayar di muka Prepaid expenses
Asuransi 1.599.875 473.163 Insurance
Biaya administrasi saham 128.333 23.333 Share administration fee
Sewa 81.377 15.778 Rental
Lain-lain 13.533 13.533 Others
Subjumlah 1.823.118 525.807 Sub-total
Uang muka - pihak ketiga Advance payments - third parties
Operasional kantor 62.400 - Office operations
Transportasi dan pengangkutan - 8.451.321 Transportation and freight
Subjumlah 62.400 8.451.321 Sub-total
Jumlah 1.885.518 8.977.128 Total
9. ASET TETAP 9. FIXED ASSETS
Aset tetap terdiri dari: Fixed assets consist of:
30 Juni 2026 / 30 June 2026
Pelepasan
Saldo awal/ entitas anak/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Disposal of Ending
balance Additions Disposals subsidiary Balance
Biaya perolehan Acquisition cost
Kepemilikan langsung Direct ownership
Tanah 116.180.830 - - - 116.180.830 Land
Prasarana jalan masuk 112.204.242 - - - 112.204.242 Access road infrastructure
Bangunan 2.259.950 - - - 2.259.950 Buildings
PLTU - Pangkalan Bun 39.440.232 - - - 39.440.232 PLTU - Pangkalan Bun
Pelabuhan 90.117.230 - - - 90.117.230 Port
Perlengkapan kapal dan tongkang 1.058.401 - - - 1.058.401 Equipment of barge and vessel
Peralatan produksi 19.778.081 - - - 19.778.081 Factory equipment
Peralatan kantor 4.188.287 - - - 4.188.287 Office equipment
Kendaraan 5.221.851 60.537 220.000 - 5.062.388 Vehicles
Peralatan dan perabotan 1.528.017 - - - 1.528.017 Furnitures and fixtures
Aset dalam penyelesaian 37.259.918 - - 33.162.000 4.097.918 Construction in progress
Melalui pembiayaan konsumen Through consumer financing
Kendaraan 805.411 - - - 805.411 Vehicle
Jumlah biaya perolehan 430.042.450 60.537 220.000 33.162.000 396.720.987 Total acquisition cost
Akumulasi penyusutan Accumulated depreciation
Kepemilikan langsung Direct ownership
Prasarana jalan masuk 55.938.276 1.848.737 - - 57.787.013 Access road infrastructure
Bangunan 2.259.950 - - - 2.259.950 Buildings
PLTU - Pangkalan Bun 27.789.477 986.006 - - 28.775.483 PLTU - Pangkalan Bun
Pelabuhan 86.886.314 535.092 - - 87.421.406 Port
Perlengkapan kapal dan tongkang 1.058.401 - - - 1.058.401 Equipment of barge and vessel
Peralatan produksi 18.305.006 190.656 - - 18.495.662 Factory equipment
Peralatan kantor 4.178.696 5.046 - - 4.183.742 Office equipment
Kendaraan 4.929.497 297.395 220.000 - 5.006.892 Vehicles
Peralatan dan perabotan 890.022 136.713 - - 1.026.735 Furnitures and fixtures
Melalui pembiayaan konsumen Through consumer financing
Kendaraan 218.132 100.676 - - 318.808 Vehicle
Jumlah akumulasi penyusutan 202.453.771 4.100.321 220.000 - 206.334.092 Total accumulated depreciation
Akumulasi penurunan nilai Accumulated impairment
Aset dalam penyelesaian 37.259.918 - - 33.162.000 4.097.918 Construction in progress
Prasarana jalan masuk 30.041.647 4.015.215 - - 34.056.862 Access road infrastructure
Nilai Buku 160.287.114 152.232.115 Book Value
Page 39
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/36 Exhibit E/36
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
9. ASET TETAP (Lanjutan) 9. FIXED ASSETS (Continued)
31 Desember 2025 / 31 December 2025
Saldo awal/ Saldo akhir/
Beginning Penambahan/ Pengurangan/ Reklasifikasi/ Ending
balance Additions Disposals Reclassification balance
Biaya perolehan Acquisition cost
Kepemilikan langsung Direct ownership
Tanah 116.180.830 - - - 116.180.830 Land
Prasarana jalan masuk 112.204.242 - - - 112.204.242 Access road infrastructure
Bangunan 2.259.950 - - - 2.259.950 Buildings
PLTU - Pangkalan Bun 276.771.994 - 237.331.762 - 39.440.232 PLTU - Pangkalan Bun
Pelabuhan 90.117.230 - - - 90.117.230 Port
Perlengkapan kapal dan tongkang 1.058.401 - - - 1.058.401 Equipment of barge and vessel
Peralatan produksi 19.778.081 - - - 19.778.081 Factory equipment
Peralatan kantor 4.188.287 - - - 4.188.287 Office equipment
Kendaraan 5.221.851 - - - 5.221.851 Vehicles
Peralatan dan perabotan 867.236 660.781 - - 1.528.017 Furnitures and fixtures
Aset dalam penyelesaian 37.259.918 - - - 37.259.918 Construction in progress
Melalui pembiayaan konsumen Through consumer financing
Kendaraan 805.411 - - - 805.411 Vehicle
Jumlah biaya perolehan 666.713.431 660.781 237.331.762 - 430.042.450 Total acquisition cost
Akumulasi penyusutan Accumulated depreciation
Kepemilikan langsung Direct ownership
Prasarana jalan masuk 52.240.801 3.697.475 - - 55.938.276 Access road infrastructure
Bangunan 2.259.950 - - - 2.259.950 Buildings
PLTU - Pangkalan Bun 182.159.622 10.871.953 165.242.098 - 27.789.477 PLTU - Pangkalan Bun
Pelabuhan 85.816.130 1.070.184 - - 86.886.314 Port
Perlengkapan kapal dan tongkang 1.058.401 - - - 1.058.401 Equipment of barge and vessel
Peralatan produksi 17.923.694 381.312 - - 18.305.006 Factory equipment
Peralatan kantor 4.159.336 19.360 - - 4.178.696 Office equipment
Kendaraan 4.149.255 780.242 - - 4.929.497 Vehicles
Peralatan dan perabotan 867.236 22.786 - - 890.022 Furnitures and fixtures
Melalui pembiayaan konsumen Through consumer financing
Kendaraan 16.779 201.353 - - 218.132 Vehicle
Jumlah akumulasi penyusutan 350.651.204 17.044.665 165.242.098 - 202.453.771 Total accumulated depreciation
Akumulasi penurunan nilai Accumulated impairment
Aset dalam penyelesaian 37.259.918 - - - 37.259.918 Construction in progress
Prasarana jalan masuk 22.308.918 7.732.729 - - 30.041.647 Access road infrastructure
Nilai Buku 256.493.391 160.287.114 Book Value
Beban penyusutan dialokasikan sebagai berikut: Depreciation expense is allocated as follows:
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Beban pokok pendapatan (Catatan 32) 1.176.661 7.109.956 Cost of revenues (Note 32)
Beban umum dan administrasi General and administrative expenses
(Catatan 33) 2.923.660 2.884.594 (Note 33)
Jumlah 4.100.321 9.994.550 Total
Rincian laba atas penjualan aset tetap adalah sebagai The details of gain on sale of fixed assets are as follows:
berikut:
30 Juni 2026/
30 June 2026
Harga jual 60.537 Selling price
Nilai buku neto - Net book value
Laba atas penjualan (Catatan 35) 60.537 Gain on sale (Note 35)
Pada tahun 2026, Grup menjual kendaraan dengan nilai In 2026, the Group sold a vehicle with a book
buku nihil. value of nil.
Page 40
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/37 Exhibit E/37
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
9. ASET TETAP (Lanjutan) 9. FIXED ASSETS (Continued)
Grup memiliki tanah dengan Hak Milik dan Hak Guna The Group has land under Property Rights and Ownership
Bangunan berlokasi di Kintap dan Serongga (Kalimantan Rights to Use with a total area of 1,011,435 m2 located in
Selatan), Kumai (Kalimantan Tengah), Rengat dan Kintap and Serongga (South Kalimantan), Kumai (Central
Tembilahan (Provinsi Riau) dengan luas 1.011.435 m2 Kalimantan), Rengat and Tembilahan (Riau Province) with
dengan jangka waktu 30-40 tahun. Manajemen terms period 30-40 years. Management believes in
berkeyakinan dapat memperpanjang hak atas tanah ini obtaining the extension of the land rights as the plots of
karena tanah tersebut diperoleh secara legal dan dilengkapi land were acquired legally and are supported by
bukti kepemilikan yang cukup. sufficient evidence of ownership.
Aset tetap, kecuali tanah, diasuransikan terhadap semua Fixed assets, except land, are covered by all risk and
risiko dan lainnya kepada PT Asuransi Sinar Mas, pihak others with PT Asuransi Sinar Mas, a third party, with
ketiga, dengan jumlah pertanggungan sebesar coverage of Rp 343,035,975 and Rp 343,160,975 as of
Rp 343.035.975 dan Rp 343.160.975 pada tanggal 30 Juni 30 June 2026 and 31 December 2025. Management
2026 dan 31 Desember 2025, Manajemen berkeyakinan believes that the insurance coverage is adequate to cover
bahwa nilai pertanggungan tersebut cukup untuk menutup possible losses.
kemungkinan kerugian.
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, Grup As of 30 June 2026 and 31 December 2025, the Group had
memiliki aset-aset yang sepenuhnya telah disusutkan namun assets that are fully depreciated but still used to support
masih digunakan untuk menunjang aktivitas operasional the Group’s operations. Gross carrying amount of such
Grup. Nilai tercatat bruto dari aset-aset tersebut masing- assets amounted to Rp 98,176,035 and Rp 95,227,559 as
masing sebesar Rp 98.176.035 dan Rp 95.227.559 pada of 30 June 2026 and 31 December 2025, respectively.
tanggal 30 Juni 2026 dan 31 Desember 2025.
Aset dalam penyelesaian pada tanggal 30 Juni 2026 dan Construction in progress as of 30 June 2026 and
31 Desember 2025 masing-masing adalah sebesar 31 December 2025 amounted to Rp 4,097,918 and
Rp 4.097.918 dan Rp 37.259.918. Pada tanggal Rp 37,259,918, respectively. As of 31 December 2025
31 Desember 2025 aset dalam penyelesaian merupakan construction in progress represents construction of
pembangunan jalan khusus angkutan batu bara yang a specific coal transportation road that was constructed
dibangun SRI dan AJP (entitas anak), yang berlokasi di Desa by SRI and AJP (subsidiaries), located in Santilik, Santiung
Santilik, Desa Santiung dan Desa Kandui, Kecamatan and Kandui Village, Mentaya Hulu and Gunung Timang
Mentaya Hulu dan Gunung Timang, Kalimantan Tengah, District, Central Kalimantan amounting to Rp 33,162,000
masing-masing sebesar Rp 33.162.000 dan Rp 4.097.918. and Rp 4,097,918, respectively. The construction of roads
Pembangunan jalan khusus angkutan batu bara telah specifically for coal transportation has stopped since
berhenti sejak 2013. Pada tahun 2018, berdasarkan tinjauan 2013. In 2018, based on a management review, the Group
manajemen, Grup telah memutuskan untuk melakukan decided to write down the value of these assets in full
penurunan nilai terhadap aset tersebut secara penuh karena because the Group believes that these assets have no
Grup meyakini bahwa aset tersebut tidak memiliki nilai yang recoverable value.
dapat dipulihkan.
Penurunan saldo aset dalam penyelesaian sebesar The decrease of the balance construction in progress
Rp 33.162.000 per 30 Juni 2026 disebabkan penjualan SRI amounted to Rp 33,162,000 as of 30 June 2026 was due to
(entitas anak) per tanggal 29 April 2026, yang merupakan the sale of SRI (subsidiary) on 29 April 2026, represents
pembangunan jalan khusus angkutan batu bara yang construction of a special coal transportation road that
dibangun SRI, yang berlokasi di Desa Santilik dan Desa was constructed by SRI, located in Santilik and Santiung
Santiung, Kecamatan Mentaya Hulu, Kalimantan Tengah. Village, Mentaya Hulu District, Central Kalimantan.
Efektif pada tanggal 29 April 2026, SRI tidak dikonsolidasi. Effective on 29 April 2026, SRI was deconsolidated.
Saldo akumulasi penurunan nilai aset tetap, prasarana The accumulated impairment of fixed assets, access
jalan masuk sebesar Rp 34.056.862 dan Rp 30.041.647 road infrastructure amounting to Rp 34,056,862 and Rp
merupakan penurunan nilai aset tetap prasarana jalan 30,041,647, respectively, represent impairment of fixed
masuk pada KGB (entitas anak) masing-masing pada tanggal assets, access road infrastructure at KGB (subsidiary) as
30 Juni 2026 dan 31 Desember 2025. Perhitungan penurunan of 30 June 2026 and 31 December 2025, respectively.
nilai aset tetap menggunakan metode nilai pakai. Calculation of impairment of fixed assets uses the value
in use method.
Pada tahun 2025, berdasarkan penilaian dari Kantor In 2025, based on an assessment by the Public Appraisal
Jasa Penilai Publik (KJPP) Rizki Djunaedy dan Service Office (KJPP) Rizki Djunaedy dan Rekan
Rekan No. 01380/2.0017-09/PP/02/0300/1/X/2025 tanggal No. 01380/2.0017-09/PP/02/0300/1/X/2025 dated
3 Oktober 2025, Perusahaan melakukan penghapusan 3 October 2025, the Company wrote off part of the fixed
sebagian aset tetap PLTU Pangkalan Bun berupa mesin dan assets of the Pangkalan Bun Power Plant in the form of
fasilitas penunjang operasional lainnya. Aset-aset tersebut machines and other operational supporting facilities. The
telah rusak dan tidak beroperasi dengan nilai buku sebesar assets were damaged and could not be operated, with a
Rp 72.089.664. book value of Rp 72,089,664.
Page 41
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/38 Exhibit E/38
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
10. ASET HAK-GUNA DAN LIABILITAS SEWA 10. RIGHT-OF-USE ASSETS AND LEASE LIABILITIES
Rincian dan mutasi aset hak-guna adalah sebagai berikut: Details and movement of right-of-use assets are as
follows:
1 Januari/ Penambahan/ Pengurangan/ 30 Juni/
January 2026 Additions Deductions June 2026
Bangunan Building
Biaya perolehan 1.696.291 - - 1.696.291 Acquisition cost
Akumulasi Accumulated
amortisasi 667.798 360.558 - 1.028.356 amortization
Nilai buku neto 1.028.493 667.935 Net book value
1 Januari/ Penambahan/ Pengurangan/ 31 Desember/
January 2025 Additions Deductions December 2025
Bangunan Building
Biaya perolehan 884.850 811.441 - 1.696.291 Acquisition cost
Akumulasi Accumulated
amortisasi 270.371 397.427 - 667.798 amortization
Nilai buku neto 614.479 1.028.493 Net book value
Rincian liabilitas sewa adalah sebagai berikut: Details of lease liabilities are as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Pihak ketiga 845.820 1.012.320 Third party
Dikurangi bagian jangka pendek (450.321 ) (426.045 ) Less current portion
Jangka panjang 395.499 586.275 Non-current
Pada tanggal 30 Juni 2026 dan 2025, jumlah yang diakui As of 30 June 2026 and 2025, total amount recognized in
pada laporan laba rugi adalah sebagai berikut: profit or loss is as follows:
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Beban amortisasi aset Amortization of right-of-use
hak-guna (Catatan 33) 360.558 269.934 assets (Note 33)
Beban bunga atas liabilitas Interest expenses of lease
sewa (Catatan 34) 36.495 24.158 liabilities (Note 34)
Jumlah 397.053 294.092 Total
11. UANG JAMINAN 11. SECURITY DEPOSITS
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, akun ini As of 30 June 2026 and 31 December 2025, this account
merupakan deposit sewa gedung dan asuransi kesehatan represents a deposit for building lease and health
sebesar Rp 307.820. insurance that amounted to Rp 307,820.
Page 42
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/39 Exhibit E/39
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
12. ASET LAIN-LAIN 12. OTHER ASSETS
Rincian aset lain-lain adalah sebagai berikut: The details of other assets are as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Uang muka 121.934.623 121.934.623 Advances
Dikurangi: Less:
Cadangan penurunan nilai (9.289.942 ) (9.289.942 ) Allowance for impairment
Neto 112.644.681 112.644.681 Net
Uang muka sebesar Rp 121.934.623 merupakan uang The down payment of Rp 121,934,623 is an advance
muka pembelian aset kepada Shandong Huatai Engineering payment for the purchase of assets from Shandong Huatai
Co., Ltd., terkait dengan pembangunan PLTU Tembilahan Engineering Co., Ltd., related to the construction of the
dan Rengat (Catatan 37b.i). Tembilahan and Rengat PLTU (Note 37b.i).
Grup tidak melakukan penambahan cadangan penurunan The Group did not increase any allowance for impairment
nilai atas uang muka, karena Grup juga memiliki utang on the advance, because the Group also has a debt of
sebesar Rp 112.644.681 kepada pihak yang sama. Rp 112,644,681 to the same party.
Grup berkeyakinan bahwa nilai aset lain-lain neto dapat The Group believes that carrying amount of net other
terealisasi setelah dikurangi dengan utang lain-lain assets can be realized after deducting other payables to
kepada pihak yang sama (Catatan 18). the same party (Note 18).
13. UANG MUKA KEUANGAN 13. FINANCIAL ADVANCES
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Proyek 205.842.498 205.842.498 Project
Pembelian batu bara 144.943.826 144.943.826 Purchases of coals
Operasional kantor 34.079.120 34.079.120 Office operations
Jumlah 384.865.444 384.865.444 Total
Dikurangi: Less:
Cadangan kerugian penurunan nilai (384.865.444 ) (384.865.444 ) Allowance for impairment losses
Neto - - Net
Mutasi cadangan kerugian penurunan nilai uang muka The movements in allowance for impairment losses on
keuangan adalah sebagai berikut: financial advances are as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Saldo awal 384.865.444 357.503.573 Beginning balance
Penyisihan tahun berjalan - 27.361.871 Provision during the year
Saldo akhir 384.865.444 384.865.444 Ending balance
Uang muka keuangan proyek sebesar Rp 205.842.498 Project financial advances amounting to Rp 205,842,498
untuk proyek prasarana PLTU Rengat dan Tembilahan yang for Steam Power Plants Rengat and Tembilahan which the
mana berkaitan dengan perjanjian yang telah dihentikan related agreements have been terminated (Notes 37.ii,
(Catatan 37b.ii, 37b.iii, 37c dan 37d). 37b.iii, 37c and 37d).
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, As of 30 June 2026 and 31 December 2025, management
manajemen telah mencadangkan seluruh saldo uang muka all financial advances balances to cover possible losses
keuangan untuk menutup kerugian yang terjadi atas tidak that may arise from the non-collection of financial
tertagihnya uang muka keuangan. advances.
Page 43
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/40 Exhibit E/40
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
14. UTANG USAHA 14. TRADE PAYABLES
Rincian utang usaha adalah sebagai berikut: The details of trade payables consist of:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Pihak ketiga Third parties
PT Borneo Indobara 595.155.785 454.334.775 PT Borneo Indobara
PT Trans Jaya Perkasa 124.830.942 124.830.942 PT Trans Jaya Perkasa
PT Perusahaan Pelayaran PT Perusahaan Pelayaran
Rusianto Bersaudara 46.570.687 35.721.237 Rusianto Bersaudara
PT Daya Guna Laksana 41.690.675 41.690.675 PT Daya Guna Laksana
PT Trans Kalimantan Perkasa 38.826.276 38.826.276 PT Trans Kalimantan Perkasa
PT Trans Power Marine Tbk 18.636.001 16.491.035 PT Trans Power Marine Tbk
PT Cipta Prima Energi Indonesia 14.225.312 14.225.312 PT Cipta Prima Energi Indonesia
PT Dwi Guna Laksana Tbk 12.100.233 5.707.427 PT Dwi Guna Laksana Tbk
CV Bhara Rasa Energi Coal 10.606.500 10.606.500 CV Bhara Rasa Energi Coal
PT Lumoso Pratama Line 9.694.054 - PT Lumoso Pratama Line
CV Hidayah 9.267.365 9.267.365 CV Hidayah
PT Sinarmas LDA Maritime 6.841.913 6.524.991 PT Sinarmas LDA Maritime
PT Bahtera Energi Samudra Tuah 5.696.316 - PT Bahtera Energi Samudra Tuah
PT Bintang Ocean Sinergy 5.670.592 1.613.646 PT Bintang Ocean Sinergy
PT Gerak Perdana Lestari 4.021.444 3.179.977 PT Gerak Perdana Lestari
PT Sumber Rejeki Samudra Jaya 3.845.631 3.078.737 PT Sumber Rejeki Samudra Jaya
PT Pandi Proteksi 1.486.693 1.486.693 PT Pandi Proteksi
PT Pelayaran Armada Nasional Indonesia 1.385.633 - PT Pelayaran Armada Nasional Indonesia
CV Multi Bara Persada 1.308.420 1.308.420 CV Multi Bara Persada
PT Pelayaran Mitra Kaltim Samudera 1.243.659 1.243.659 PT Pelayaran Mitra Kaltim Samudera
PT Mitra Bahari Internusa - 1.518.692 PT Mitra Bahari Internusa
PT Trans Maritim Pratama - 1.425.605 PT Trans Maritim Pratama
Lain-lain (masing-masing di bawah Others (each
Rp 1.000.000) 3.710.728 3.937.041 below Rp 1,000,000)
Jumlah 956.814.859 777.019.005 Total
Analisa umur utang usaha berdasarkan tanggal jatuh tempo The aging analysis of trade payables based on maturity
adalah sebagai berikut: date is as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Belum jatuh tempo 503.631.259 353.610.807 Current
Jatuh tempo Past due
1 sampai 30 hari 115.613.994 106.776.242 1 to 30 days
31 sampai 60 hari 29.231.683 13.356.397 31 to 60 days
61 sampai 90 hari 10.064.676 3.966.167 61 to 90 days
Lebih dari 90 hari 298.273.247 299.309.392 More than 90 days
Jumlah 956.814.859 777.019.005 Total
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, seluruh As of 30 June 2026 and 31 December 2025, all the carrying
nilai tercatat utang usaha berdenominasi Rupiah. Karena amount of trade payables are denominated in Rupiah.
sifatnya yang jangka pendek, nilai wajar utang usaha Due to its short-term nature, the fair value of trade
diperkirakan sama dengan nilai tercatatnya. payable is estimated to be the same as its carrying value.
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, tidak As of 30 June 2026 and 31 December 2025, there is no
ada jaminan yang diberikan Grup atas utang usaha di atas. collateral provided by the Group for the trade payables
above.
Page 44
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/41 Exhibit E/41
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
15. UTANG BANK JANGKA PANJANG 15. LONG-TERM BANK LOAN
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
PT Bank Sinarmas Tbk 92.116.728 122.543.611 PT Bank Sinarmas Tbk
Dikurangi: laba restrukturisasi (330.987) - Less: gain on restructuring
Neto 91.785.741 122.543.611 Net
Dikurangi: bagian yang jatuh tempo
dalam waktu satu tahun (63.922.228 ) (61.413.954 ) Less: current maturities
Bagian jangka panjang 27.863.513 61.129.657 Long-term portion
PT Bank Sinarmas Tbk PT Bank Sinarmas Tbk
Pinjaman Berjangka I (Non-Revolving-Uncommitted) Term Loan I (Non-Revolving-Uncommitted)
Berdasarkan Akta Perjanjian Kredit No. 14 tanggal Based on Credit Agreement Deed No. 14 dated 16 October
16 Oktober 2019 antara Perusahaan dan PT Bank 2019 between the Company and PT Bank Sinarmas Tbk,
Sinarmas Tbk, Perusahaan memperoleh fasilitas kredit the Company obtained a credit facility of Rp 150,000,000.
sebesar Rp 150.000.000. Jangka waktu fasilitas ini adalah The term of this facility is 72 months with an interest
72 bulan dengan bunga sebesar 12% per tahun. Tujuan bear of 12% per annum. The purpose of the loan is for
pinjaman adalah untuk modal kerja. Jaminan atas working capital. The collateral for this credit agreement
perjanjian kredit ini adalah piutang usaha atas perjanjian is the trade receivable of the Company coal purchase
jual beli batu bara (PJBB) Perusahaan dengan PT PLN agreement (PJBB) with PT PLN (Persero) is bound by
(Persero) yang diikat dengan Akta Jaminan Fidusia No. 16 Fiduciary Deed No. 16 dated 16 October 2019. This loan
tanggal 16 Oktober 2019. Fasilitas pinjaman ini telah facility has been fully paid on 1 October 2020.
dilunasi pada tanggal 1 Oktober 2020.
Pinjaman Berjangka II (Non-Revolving-Uncommitted) Term Loan II (Non-Revolving-Uncommitted)
Berdasarkan Akta Adendum Perjanjian Kredit No. 12 Based on the Deed of Addendum Credit Agreement
tanggal 20 Desember 2019 antara Perusahaan dengan No. 12 dated 20 December 2019, between the Company
PT Bank Sinarmas Tbk, Grup memperoleh tambahan and PT Bank Sinarmas Tbk, the Group obtained an
fasilitas pinjaman sebesar Rp 400.000.000. Jangka waktu additional credit facility of Rp 400,000,000. The term of
fasilitas ini adalah 72 bulan dengan bunga 12% per tahun. the facility is 72 months with an interest rate of 12% per
Jaminan atas perjanjian kredit ini adalah piutang usaha annum. The collateral for this credit agreement is the
atas Perjanjian Jual Beli Batu Bara (PJBB) antara trade receivable of the Company’s Coal Purchase
Perusahaan dengan PT PLN (Persero) yang diikat dengan Agreement (PJBB) with PT PLN (Persero) which is bound
Akta Jaminan Fidusia No. 14, tanggal 20 Desember 2019. by Fiduciary Deed No. 14 dated 20 December 2019. This
Fasilitas pinjaman ini telah dilunasi pada tanggal loan facility has been fully paid on 1 October 2020.
1 Oktober 2020.
Berdasarkan Adendum Perjanjian Kredit No. 002/P-041/ Based on the Addendum Credit Agreement No. 002/P-
TL/X/2020 tanggal 1 Oktober 2020 antara Grup dengan 041/TL/X/2020 dated 1 October 2020, between the
PT Bank Sinarmas Tbk, Perusahaan memperoleh Company and PT Bank Sinarmas Tbk, the Group
restrukturisasi fasilitas pinjaman sebesar Rp 498.696.615. had restructured credit facility amounting to
Jangka waktu fasilitas ini adalah 72 bulan dengan bunga Rp 498,696,615. The term of this facility is 72 months
12% per tahun. Jaminan atas perjanjian kredit ini adalah with an interest rate of 12% per annum. The collateral
piutang usaha atas Perjanjian Jual Beli Batu Bara (PJBB) for this credit agreement is the trade receivable of the
antara Perusahaan dengan PT PLN (Persero) (Catatan 5). Company’s Coal Purchase Agreement (PJBB) with PT PLN
(Persero) (Note 5).
Page 45
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/42 Exhibit E/42
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
15. UTANG BANK JANGKA PANJANG (Lanjutan) 15. LONG-TERM BANK LOAN (Continued)
PT Bank Sinarmas Tbk (Lanjutan) PT Bank Sinarmas Tbk (Continued)
Pinjaman Berjangka II (Non-Revolving-Uncommitted) Term Loan II (Non-Revolving-Uncommitted) (Continued)
(Lanjutan)
Dalam perjanjian pinjaman dengan PT Bank Sinarmas Tbk, In this loan agreement with PT Bank Sinarmas Tbk, the
Perusahaan tidak diperkenankan untuk melakukan Company is not allowed to do the following matters
beberapa hal berikut tanpa persetujuan tertulis (negative without written approval:
covenant):
a) Memperoleh pinjaman uang atau kredit baru dari a) Obtain loan or new credit facility from other
kreditur lain; creditors;
b) Meminjamkan uang, termasuk tetapi tidak terbatas b) Fund lending, including but not limited to affiliated,
kepada Perusahaan afiliasi, kecuali dalam rangka except for daily operational activities;
menjalankan usaha sehari-hari;
c) Mengikat diri sebagai penjamin utang atau c) Allow to be a guarantor of debt or pledge the
menjaminkan harta kekayaan perusahaan kepada Company’s assets to another party;
pihak lain;
d) Melakukan investasi, penyertaan atau membuka d) Invest or start a new business in addition to existing
usaha baru selain usaha, investasi, atau penyertaan business or investment;
yang telah ada;
e) Menjual atau setuju untuk menjual atau melepaskan e) Sell or agree to sell or release all or most part of the
seluruh atau sebagian besar dari aset Perusahaan; Company’s assets; except for daily operational
kecuali untuk transaksi yang dilakukan di dalam transactions;
sehari-harinya;
f) Mengadakan pembayaran di muka mengenai utang f) Repayment of non-bank loan, including but not
yang bukan utang kepada bank, termasuk tapi tidak limited to shareholders’ debt;
terbatas pada utang pemegang saham;
g) Melakukan peleburan dan/atau penggabungan g) Conducting a merger and/or acquisition and/or
dan/atau pengambilalihan dan/atau pembubaran; takeover and/or liquidation;
h) Mengubah status kelembagaan dan/atau melakukan h) Change the entity status and/or decrease capital
penurunan modal dan/atau melakukan penarikan and/or withdraw the paid-up capital and/or change
modal disetor dan/atau mengubah susunan para the shareholders’ composition and/or change the
pemegang saham dan/atau melakukan perubahan articles of association;
anggaran dasar;
i) Melakukan pelunasan utang dan/atau pembagian i) Settle all the shareholders’ debt or distribute the
dividen kepada pemegang saham; dividends to Shareholders;
j) Menjual atau menyewakan jaminan yang dijaminkan j) Sell or rent the collaterals guaranteed to the bank.
kepada bank.
Berdasarkan Akta Notaris No. 12 tanggal 22 Maret 2021 Based on Notarial Deed No. 12 dated 22 March 2021,
antara Perusahaan dengan PT Bank Sinarmas Tbk, kedua between the Company and PT Bank Sinarmas Tbk, both
pihak setuju untuk mengubah tingkat bunga pinjaman dari parties agreed to change the interest rate of the loan
12% per tahun menjadi 11% per tahun serta mengubah from 12% per annum to 11% per annum and also change
skema pembayaran pokok pinjaman dan bunga pinjaman the payment schedule of loan principal and loan interest
untuk periode Maret 2021 sampai dengan Desember 2025. from March 2021 to December 2025.
Pinjaman Berjangka III (Non-Revolving-Uncommitted) Term Loan III (Non-Revolving-Uncommitted)
Berdasarkan akta adendum perjanjian kredit No. 02 dari Based on the addendum deed of credit agreement No. 02
Notaris Dahlia, S.H., di Jakarta tanggal 5 Juni 2025, from Notary Dahlia, S.H., in Jakarta dated 5 June 2025,
Perusahaan memperoleh resktrukturisasi fasilitas the Company obtained a restructuring of the loan facility
pinjaman atas perjanjian berjangka II (non revolving under the term II agreement (non-revolving
uncomitted) sebesar Rp 155.291.978, dengan perubahan uncommitted) amounting to Rp 155,291,978, with a
jangka waktu jatuh tempo sampai dengan 20 November change in the maturity period until 20 November 2027,
2027, dan dengan perubahan beberapa negative covenant. and with changes to several negative covenants.
Berdasarkan Surat Keterangan Penurunan Suku Bunga No. Based on the Interest Rate Reduction Certificate No.
SKL.034/02-2026/Corp-DIR2 tanggal 12 Februari 2026, SKL.034/02-2026/Corp-DIR2 dated 12 February 2026, the
Perusahaan mendapatkan persetujuan untuk penurunan Company obtained approval for a reduction in the
suku bunga pinjaman atas fasilitas kredit Term Loan yang interest rate on its Term Loan credit facility from 11% to
sebelumnya 11% menjadi 10,5% per tahun berlaku efektif 10.5% per annum, effective from 12 February 2026.
mulai 12 Februari 2026.
Selama tahun 2026 dan 2025, Perusahaan telah melakukan In 2026 and 2025, the Company has paid for this
pembayaran atas fasilitas ini masing-masing sebesar facility amounting to Rp 30,426,883 and Rp 54,961,052,
Rp 30.426.883 dan Rp 54.961.052. respectively.
Page 46
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/43 Exhibit E/43
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
16. UANG MUKA PELANGGAN 16. ADVANCES FROM CUSTOMERS
Akun ini merupakan uang muka dari pelanggan dengan This account represents down payments from customer,
rincian sebagai berikut: with details as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Pihak ketiga Third party
PT Cipta Prima Energi Indonesia 21.174.291 21.174.291 PT Cipta Prima Energi Indonesia
Jumlah 21.174.291 21.174.291 Total
17. BIAYA MASIH HARUS DIBAYAR 17. ACCRUED EXPENSES
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Bunga liabilitas keuangan lainnya 22.875.577 22.875.577 Interest on other financial liabilities
Bunga pinjaman bank 281.468 411.883 Interest on bank loan
Jaminan sosial ketenagakerjaan 100.037 13.414 Employment social security
Jasa profesional - 365.400 Professional fee
Lain-lain (masing-masing Others (each below
di bawah Rp 100.000) 19.069 560.564 Rp 100,000)
Jumlah 23.276.151 24.226.838 Total
Saldo bunga liabilitas keuangan lainnya pada tanggal Balance of interest on other financial liabilities as of
30 Juni 2026 dan 31 Desember 2025 sebesar 30 June 2026 and 31 December 2025 amounting to
Rp 22.875.577 merupakan bunga atas pinjaman dari PT AB Rp 22,875,577 was interest on loan from PT AB Sinar Mas
Sinar Mas Multifinance. Multifinance.
18. UTANG LAIN-LAIN 18. OTHER PAYABLES
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Jangka Pendek Current
Pihak ketiga Third parties
Shandong Huatai Engineering 112.644.681 112.644.681 Shandong Huatai Engineering
PT Trans Kalimantan Perkasa 26.721.973 26.721.973 PT Trans Kalimantan Perkasa
PT Daya Guna Laksana 26.520.196 35.543.743 PT Daya Guna Laksana
PT Trans Guna Perkasa 15.397.434 15.397.434 PT Trans Guna Perkasa
PT Trans Jaya Perkasa 12.450.292 12.450.292 PT Trans Jaya Perkasa
PT Sinar Surya Borneo 6.463.000 6.463.000 PT Sinar Surya Borneo
Lain-lain (masing-masing di bawah Others (each below
Rp 5.000.000) 32.418.728 32.768.067 Rp 5,000,000)
Subjumlah 232.616.304 241.989.190 Sub-total
Pihak berelasi (Catatan 28b) 35.461.715 35.761.715 Related party (Note 28b)
Jumlah 268.078.019 277.750.905 Total
19. LIABILITAS KEUANGAN LAINNYA 19. OTHER FINANCIAL LIABILITIES
a. Liabilitas Keuangan Lainnya a. Other Financial Liabilities
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Pihak ketiga Third parties
PT Sinar Mas Multifinance 202.584.619 203.008.843 PT Sinar Mas Multifinance
PT AB Sinar Mas Multifinance 56.000.000 56.000.000 PT AB Sinar Mas Multifinance
Jumlah 258.584.619 259.008.843 Total
Dikurangi: bagian yang jatuh tempo
dalam waktu satu tahun (56.679.284 ) (56.633.374 ) Less: current maturities
Bagian jangka panjang 201.905.335 202.375.469 Long-term portion
Page 47
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/44 Exhibit E/44
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
19. LIABILITAS KEUANGAN LAINNYA (Lanjutan) 19. OTHER FINANCIAL LIABILITIES (Continued)
b. Perjanjian Liabilitas Keuangan Lainnya b. Other Financial Liabilities Agreement
PT Sinar Mas Multifinance PT Sinar Mas Multifinance
Pada tanggal 27 Juni 2019, Perusahaan memperoleh On 27 June 2019, the Company obtained a factoring
fasilitas anjak piutang (with recourse) dari PT Sinar facility (with recourse) from PT Sinar Mas
Mas Multifinance berdasarkan perjanjian No. 045F/ Multifinance based on agreement No. 045F/SMMF-
SMMF-PAP/VI/2019 dalam bentuk fasilitas modal kerja PAP/VI/2019 in the form of working capital facility
sebesar Rp 360.000.000 dengan jangka waktu amounting to Rp 360,000,000 with a loan term of 2
pinjaman 2 (dua) tahun sejak tanggal 27 Juni 2019 (two) years from 27 June 2019 to 27 June 2021. The
sampai dengan 27 Juni 2021. Tingkat diskonto sebesar discount rate of the loan is 14% per year. This facility
14% per tahun. Fasilitas ini telah diperpanjang dengan has been extended based on the Factoring Facility
Surat Perjanjian Fasilitas Anjak Piutang Agreement Letter No. 008B/SMMF-PAP/VI/2022 until
No. 008B/SMMF-PAP/VI/2022 sampai dengan tanggal 27 June 2023. On 27 June 2023, the loan balances
27 Juni 2023. Pada tanggal 27 Juni 2023, saldo were combined into the Factoring Agreement
pinjaman telah digabungkan ke Perjanjian Anjak No. 012B/SMMF-PAP/VI/2023 with maturity date on
Piutang No. 012B/SMMF-PAP/VI/2023 dengan jatuh 27 June 2025.
tempo pada tanggal 27 Juni 2025.
Berdasarkan Surat Perjanjian Fasilitas Anjak Piutang Based on the Factoring Facility Agreement Letter
No. 038B/SMMF-PAP/VI/2021 tanggal 30 Juni 2021, No. 038B/SMMF-PAP/VI/2021 dated 30 June 2021,
PT Sinar Mas Multifinance memberikan fasilitas anjak PT Sinar Mas Multifinance provides factoring facilities
piutang untuk tujuan penggunaan modal kerja dengan for the purpose of working capital with a maximum
fasilitas maksimum sebesar Rp 150.000.000, dengan facility Rp 150,000,000, with a discount rate of 14%
tingkat diskonto 14% efektif per tahun. Jangka waktu effective per year. The term of the facility is 1 year
fasilitas selama 1 tahun dari 30 Juni 2021 sampai from 30 June 2021 to 30 June 2022. This facility has
30 Juni 2022. Fasilitas ini telah diperpanjang dengan been extended based on the Factoring Facility
Surat Perjanjian Fasilitas Anjak Piutang No. 009B/ Agreement Letter No. 009B/SMMF-PAP/VI/2022
SMMF-PAP/VI/2022 sampai dengan tanggal 30 Juni until 30 June 2023. On 27 June 2023, the loan
2023. Pada tanggal 27 Juni 2023, saldo pinjaman telah balances were combined into Factoring Agreement
digabungkan ke Perjanjian Anjak Piutang No. 012B/SMMF-PAP/VI/2023 with maturity date on
No. 012B/SMMF-PAP/VI/2023 dengan jatuh tempo 27 June 2025.
pada tanggal 27 Juni 2025.
Berdasarkan perjanjian di atas, Perusahaan mengikat Based on the agreement above, the Company binds
diri untuk memenuhi persyaratan serta ketentuan itself to fulfill the following terms and conditions:
sebagai berikut:
a) Seluruh data, pernyataan, laporan dan semua a) All data, statements, reports and all documents
dokumen berkenan dengan hutang pelanggan relating to the customer’s debt to the Company
kepada Perusahaan adalah lengkap dan sah. are complete and valid.
b) Setiap piutang yang dimaksud dalam Perjanjian b) Each receivable referred to in this Agreement is
ini adalah merupakan piutang yang timbul dari a receivable arising from a sale and purchase
transaksi jual beli, pelaksanaan penyerahaan/ transaction, the implementation of the delivery/
pengiriman barang yang dilakukan dengan benar delivery of goods that is carried out correctly and
dan sah, serta bebas dari segala tuntutan hukum, legally, and is free from all lawsuits, claims for
tuntutan kerusakan, tuntutan komisi/jasa yang damages, demands for commissions/services
timbul dari siapapun juga (kecuali untuk potongan- arising from anyone. (except for special discounts
potongan khusus yang menjadi hak pelanggan that are the right of the customer in accordance
sesuai dengan perjanjian jual beli/transaksi), with the sale and purchase
tidak/belum daluwarsa, tidak/belum pernah agreement/transaction), do not/have not
dibayar atau diperhitungkan cara pembayarannya expired, have not/have not been paid for or the
(misalnya karena kompensasi, ganti rugi dan lain- method of payment is calculated (for example
lain), tidak/belum pernah dibatalkan atau menjadi due to compensation, compensation and others),
batal oleh sebab apapun. not/has never been canceled or canceled for any
reason.
c) Seluruh hak perusahaan yang timbul dari adanya c) All rights of the company arising from
perjanjian/transaksi antara perusahaan dengan agreements/ transactions between the company
para Customer menjadi hak Kreditur sepenuhnya and the Customers become the full rights of the
tanpa kecuali apapun juga, termasuk hak atas Creditors without any exception whatsoever,
penerimaan pembayaran hutang, hak atas bunga, including the right to receive debt payments, the
hak untuk menagih/menuntut pembayaran hutang right to interest, the right to collect/demand
para Customer atau dari pihak lain, dan Kreditur payment of the debts of the Customers or from
berhak untuk melaksanakan penarikan barang- other parties, and the Creditor has the right to
barang yang dibeli oleh para Customer dalam hal carry out the withdrawal of goods purchased by
terjadi kejadian-kejadian yang menurut the Customers in the event of events that
pertimbangan Kreditur pantas dan layak untuk according to the Creditor’s consideration are
dilakukan hal dimaksud. appropriate and appropriate to do this.
Page 48
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/45 Exhibit E/45
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
19. LIABILITAS KEUANGAN LAINNYA (Lanjutan) 19. OTHER FINANCIAL LIABILITIES (Continued)
b. Perjanjian Liabilitas Keuangan Lainnya (Lanjutan) b. Other Financial Liabilities Agreement (Continued)
PT Sinar Mas Multifinance (Lanjutan) PT Sinar Mas Multifinance (Continued)
Berdasarkan perjanjian di atas, Perusahaan mengikat Based on the agreement above, the Company binds
diri untuk memenuhi persyaratan serta ketentuan itself to fulfill the following terms and conditions:
sebagai berikut: (Lanjutan) (Continued)
d) Perusahaan tidak akan melakukan perubahan atau d) The Company will not make changes or renew
memperbaharui perjanjian/transaksi jual beli sales and purchase agreements/transactions
antara Perusahaan dengan para Customer, between the Company and the Customers, has
tidak telah atau akan membatalkan not or will cancel the agreement/sales purchase
perjanjian/Transaksi jual beli tersebut, tidak transactions, has not or will mortgage its
telah atau akan mengadaikan piutangnya kepada receivables to other parties and/or carry out
pihak lain dan/atau melaksanakan segala sesuatu anything that might cause losses to Creditors in
yang mungkin menimbulkan kerugian pada accordance with this Agreement, without written
Kreditur berkenan dengan Perjanjian ini, tanpa approval from Creditors.
persetujuan tertulis dari Kreditur.
e) Bahwa kecuali dengan persetujuan khusus dari e) That except with special approval from the
Kreditur, para Customer tidak termasuk dalam Creditor, the Customers are not included in the
kategori yang termuat dalam Pasal 3 ayat (4) pada category contained in Article 3 paragraph (4) of
Perjanjian tersebut. the Agreement.
f) Bahwa transaksi yang dilakukan antara Perusahaan f) Whereas the transactions made between the
dengan Customer merupakan transaksi yang tidak Company and the Customer are transactions that
memuat mengenai larangan atau pembatasan do not contain any prohibitions or restrictions
tentang pengalihan piutang dari Perusahaan regarding the transfer of receivables from the
kepada pihak lain. Company to other parties.
Berdasarkan Adendum Surat Perjanjian Fasilitas Anjak Based on Addendum of Factoring Facility Agreement
Piutang No. 007B/SMMF-PAP-ADD-EEI/VI/2024 tanggal Letter No. 007B/SMMF-PAP-ADD-EEI/VI/2024 dated
13 Juni 2024, Perusahaan dan PT Sinar Mas 13 June 2024, the Company and PT Sinar Mas
Multifinance menyetujui untuk mengubah jatuh tempo Multifinance agreed to change the maturity of the
perjanjian dari 27 Juni 2025 menjadi 30 April 2029 agreement from 27 June 2025 to 30 April 2029 with
dengan fasilitas maksimum sebesar Rp 250.000.000, a maximum facility of Rp 250,000,000, and a discount
dan tingkat diskonto 14% efektif per tahun. rate of 14% effective per year.
Berdasarkan Adendum Kedua Surat Perjanjian Fasilitas Based on Addendum of Factoring Facility Agreement
Anjak Piutang No. 005A/SMMF-PAP-ADD-EEI/VII/2025 Letter No. 005A/SMMF-PAP-ADD-EEI/VII/2025 dated
tanggal 11 Juli 2025, Perusahaan telah melakukan 11 July 2025, the Company has made a payment of
pembayaran sebesar Rp 27.948.616 kepada PT Sinar Rp 27,948,616 to PT Sinar Mas Multifinance on 25 July
Mas Multifinance pada tanggal 25 Juli 2025, 2025, and this payment will also change the value of
pembayaran tersebut sekaligus mengubah nilai the installment payments of the facility for each
pembayaran angsuran fasilitas per bulan. month.
PT AB Sinar Mas Multifinance PT AB Sinar Mas Multifinance
Pada tanggal 28 Mei 2019, berdasarkan perjanjian On 28 May 2019, under the agreement of factoring
anjak piutang No. 329/PAP/ABSMMF/V/2019, No. 329/PAP/ABSMMF/V/2019, the Company obtained
Perusahaan memperoleh fasilitas anjak piutang (with factoring facility (with recourse) from PT AB Sinar
recourse) dari PT AB Sinar Mas Multifinance sebesar Mas Multifinance amounted to Rp 56,000,000 with a
Rp 56.000.000 dengan jangka waktu pinjaman 2 tahun loan period of 2 years from 28 May 2019 to 28 May
sejak tanggal 28 Mei 2019 sampai dengan 28 Mei 2021 2021 with discount rate of 14% per annum (charged at
dengan tingkat diskonto 14% per tahun yang settlement). This facility has been extended based
dibebankan pada saat pembayaran. Fasilitas ini telah on the agreement of factoring No. 329/PAP/
diperpanjang dengan perjanjian anjak piutang ABSMMF/V/2021 until 28 May 2023. This facility was
No. 329/PAP/ABSMMF/V/2021 sampai dengan 28 Mei extended until 28 May 2025 through a Second
2023. Fasilitas ini diperpanjang kembali dengan Addendum dated 26 May 2023. On 28 May 2025, this
Adendum Kedua tanggal 26 Mei 2023 sampai dengan facility was extended until 28 May 2027 through a
28 Mei 2025. Pada tanggal 28 Mei 2025, fasilitas ini Third Addendum.
diperpanjang kembali dengan Adendum Ketiga sampai
dengan 28 Mei 2027.
Page 49
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/46 Exhibit E/46
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
19. LIABILITAS KEUANGAN LAINNYA (Lanjutan) 19. OTHER FINANCIAL LIABILITIES (Continued)
b. Perjanjian Liabilitas Keuangan Lainnya (Lanjutan) b. Other Financial Liabilities Agreement (Continued)
PT AB Sinar Mas Multifinance (Lanjutan) PT AB Sinar Mas Multifinance (Continued)
Berdasarkan seluruh perjanjian dengan PT AB Sinar Mas Based on entire agreements with PT AB Sinar Mas
Multifinance di atas, Perusahaan akan menyerahkan Multifinance, the Company will hand over all its
seluruh haknya kepada PT AB Sinar Mas Multifinance rights to PT AB Sinar Mas Multifinance, as the owner
sebagai pemilik piutang yang sah, termasuk hak untuk of the receivables, including the rights to collect
menagih piutang dengan segala cara, hak Perusahaan receivables by all means, rights to take
atas bunga/keuntungan lain atau hak yang timbul dari interest/other benefits or rights arising from
jaminan asuransi dalam kaitannya dengan utang insurance coverage in relation to the liabilities, and
dimaksud, serta hak-hak Perusahaan yang timbul rights that arise as a result of transactions between
sebagai akibat adanya transaksi antara Perusahaan the Company, and customer; whose its receivables
dengan Pelanggan tanpa kecuali. Perusahaan juga are transferred, without any exception. The
menyetujui untuk mengalihkan seluruh keuntungan Company also agrees to transfer all profits related to
berkenaan dengan piutang-piutang dimaksud beserta the receivables and the Company’s all of rights to be
dengan seluruh hak Perusahaan untuk menjaminkan guaranteed in connection with the Sale and Purchase
sehubungan dengan Perjanjian Jual Beli antara Agreement between the Company and the Customer.
Perusahaan dengan Pelanggan.
20. UANG JAMINAN 20. SECURITY DEPOSIT
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Jangka pendek Current
PT Berau Coal Energy 93.282.000 93.282.000 PT Berau Coal Energy
Jumlah 93.282.000 93.282.000 Total
Jangka panjang Non-current
PT Sinergi Laksana Bara Mas 286.660.000 324.160.000 PT Sinergi Laksana Bara Mas
Jumlah 286.660.000 324.160.000 Total
PT Berau Coal Energy PT Berau Coal Energy
Berdasarkan perjanjian tanggal 17 Mei 2017 antara Based on the agreement dated 17 May 2017 between
Perusahaan dengan PT Berau Coal Energy mengenai the Company and PT Berau Coal Energy regarding
pemberian uang jaminan, PT Berau Coal Energy dan the security deposit, PT Berau Coal Energy and the
Perusahaan sepakat untuk melakukan kerja sama di mana Company agreed to cooperate in which the Company will
Perusahaan akan mendirikan dan mengoperasikan power establish and operate a powerplant or PLTU and PT Berau
plant atau pembangkit listrik tenaga uap (“PLTU”) dan Coal Energy will purchase the output of the power plant
PT Berau Coal Energy akan membeli output dari PLTU (Note 37f).
tersebut berupa tenaga listrik (Catatan 37f).
Berdasarkan kesepakatan tersebut Perusahaan menerima Based on the agreement, the Company received security
uang jaminan dari PT Berau Coal Energy atas komitmen deposit from PT Berau Coal Energy on its commitment
pembelian tenaga listrik sebesar Rp 93.282.000. Jangka to purchase electricity amounting to Rp 93,282,000. The
waktu perjanjian adalah sejak ditandatanganinya term of this agreement is from the date of signing of this
perjanjian ini sampai dengan uang jaminan dikembalikan agreement until the security deposit is returned entirely
seluruhnya oleh Perusahaan. by the Company.
Berdasarkan Perjanjian Jual beli Batu Bara No. 01.02/ Based on the Coal Sale and Purchase Agreement
SLBM/DIR/KGB/VIII/2021 tanggal 2 Agustus 2021, antara No. 01.02/SLBM/DIR/KGB/VIII/2021 dated 2 August 2021,
KGB, entitas anak, dengan PT Sinergi Laksana Bara between KGB, a subsidiary, and PT Sinergi Laksana Bara
Mas (pihak ketiga), kedua belah pihak sepakat bahwa Mas (third party), both parties agreed that PT Sinergi
PT Sinergi Laksana Bara Mas akan membeli batu bara dari Laksana Bara Mas will purchase coal from KGB. Based on
KGB. Berdasarkan kesepakatan tersebut, KGB menerima the agreement, KGB received a security deposit from PT
sejumlah uang jaminan dari PT Sinergi Laksana Bara Mas Sinergi Laksana Bara Mas amounted to Rp 145,000,000 to
sebesar Rp 145.000.000 untuk melakukan proses carry out the process of extending the Mining Business
perpanjangan IUP dan proses pembukaan lahan untuk License (IUP) and the process of land clearing for coal
eksploitasi batubara dan studi eksplorasi dalam rangka exploitation, as well as exploration studies to identify
mencari potensi cadangan batubara baru lainnya. Jangka potential new coal reserves. The term of this agreement
waktu perjanjian ini berlaku sampai dengan habisnya is valid until the exhaustion of economically producible
cadangan batu bara yang dapat diproduksi secara coal reserves (life of mine) in the IUP.
ekonomis (life of mine) di IUP.
Page 50
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/47 Exhibit E/47
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
20. UANG JAMINAN (Lanjutan) 20. SECURITY DEPOSIT (Continued)
PT Sinergi Laksana Bara Mas (Lanjutan) PT Sinergi Laksana Bara Mas (Continued)
Perjanjian ini telah beberapa kali diamandemen, These agreement has been amanded several times, with
perubahan terakhir pada tanggal 4 Desember 2025, dimana the latest changes on 4 December 2025, which the term
jangka waktu uang jaminan tersebut diperpanjang sampai of security deposit was extended until 31 December 2027,
dengan 31 Desember 2027 atau disepakati lain oleh kedua or as otherwise agreed by both parties.
belah pihak.
Selama tahun 2026 dan 2025, KGB telah beberapa kali During 2026 and 2025, KGB made several repayment of
melakukan pengembalian uang jaminan dengan total security deposits totaling to Rp 12,500,000 and
masing-masing sebesar Rp 12.500.000 dan Rp 25.000.000. Rp 25,000,000, respectively. The security deposit balance
Saldo uang jaminan per 30 Juni 2026 dan 31 Desember 2025 as of 30 June 2026 and 31 December 2025 is amounting to
masing-masing adalah sebesar Rp 107.500.000 dan Rp 107,500,000 and Rp 120,000,000, respectively.
Rp 120.000.000.
Berdasarkan Perjanjian Angkutan Laut No. 01.21/SLBM/ Based on the Sea Transport Agreement No. 01.21/SLBM/
DIR/TLS/X/2021 tanggal 1 Oktober 2021, antara TLS, DIR/TLS/X/2021 dated 1 October 2021, between TLS, a
entitas anak, dengan PT Sinergi Laksana Bara Mas (pihak subsidiary, and PT Sinergi Laksana Bara Mas (third party),
ketiga), kedua belah pihak sepakat bahwa PT Sinergi both parties agreed that PT Sinergi Laksana Bara Mas will
Laksana Bara Mas akan menggunakan jasa pengangkutan use the coal transportation services of TLS. Based on the
batu bara milik TLS. Berdasarkan kesepakatan tersebut agreement, TLS received a security deposit amounting to
TLS menerima sejumlah uang jaminan dari PT Sinergi Rp 110,000,000 from PT Sinergi Laksana Bara Mas where
Laksana Bara Mas sebesar Rp 110.000.000 di mana the payment of coal transportation services will be made
pembayaran jasa pengangkutan batu bara akan dilakukan by deducting the security deposit that has been paid in
dengan cara memotong uang jaminan yang telah accordance with the value of the coal transportation
dibayarkan sesuai dengan jasa pengangkutan batu bara services price billed. The term of this agreement is valid
yang ditagih. Jangka waktu perjanjian ini berlaku sejak from the date of this agreement which 1 October 2021
tanggal perjanjian yakni 1 Oktober 2021 sampai dengan until 30 September 2026 and can be extended based on
30 September 2026 dan dapat diperpanjang berdasarkan agreement.
hasil kesepakatan.
Berdasarkan Adendum I Perjanjian Angkutan Laut Based on the Addendum I of the Sea Transport Agreement
No. 01.04/SLBM/DIR/TLS/VII/2022 tanggal 4 Juli 2022, No. 01.04/SLBM/DIR/TLS/VII/2022 dated 4 July 2022,
para pihak menyetujui perubahan Pasal 4 Perjanjian where the parties agreed to amend Article 4 of the
terkait uang jaminan, TLS menerima tambahan uang Agreement related to deposit, TLS received an additional
jaminan dari PT Sinergi Laksana Bara Mas sebesar security deposit amounting to Rp 110,000,000 from
Rp 110.000.000. Jumlah saldo uang jaminan yang diterima PT Sinergi Laksana Bara Mas. The total balance of the
TLS dari PT Sinergi Laksana Bara Mas sebesar total security deposit received from PT Sinergi Laksana Bara
Rp 220.000.000. Jangka waktu perjanjian ini berlaku sejak Mas by TLS amounting to Rp 220,000,000. The terms of
tanggal ditandatangani Adendum I sampai dengan this agreement are effective from the date of the signing
30 September 2026. Addendum I until 30 September 2026.
Selama tahun 2026 dan 2025, TLS telah beberapa kali During 2026 dan 2025, TLS made several repayment of
melakukan pengembalian uang jaminan dengan total security deposit totaling to Rp 25,000,000 and
masing-masing sebesar Rp 25.000.000 dan Rp 15.840.000. Rp 15,840,000, respectively. The security deposit
Saldo uang jaminan per 30 Juni 2026 dan 31 Desember 2025 balances as of 30 June 2026 and 31 December 2025 is
masing-masing adalah sebesar Rp 179.160.000 dan amounting to Rp 179,160,000 and Rp 204,160,000,
Rp 204.160.000. respectively.
Page 51
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/48 Exhibit E/48
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
21. PERPAJAKAN 21. TAXATION
a. Pajak Dibayar di Muka a. Prepaid Taxes
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Pajak penghasilan: Income taxes:
PPN Restitusi 124.404.904 149.835.074 VAT-Restitution
Pajak penghasilan: Income taxes:
Pasal 21 - 21.700 Article 21
Jumlah 124.404.904 149.856.774 Total
b. Utang Pajak b. Tax Payables
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Pajak penghasilan: Income taxes:
Nonfinal Non-final
Pasal 21 3.003.644 - Article 21
Pasal 22 1.305 78.184 Article 22
Pasal 23 5.438 4.865 Article 23
Pasal 25 - 12.634.612 Article 25
Pasal 29 5.652.504 - Article 29
Final Final
Pasal 4(2) 731 1.220 Article 4(2)
Pasal 15 415.413 295.425 Article 15
Jumlah 9.079.035 13.014.306 Total
c. Taksiran Tagihan Pajak Penghasilan c. Estimated Claims for Tax Refund
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Perusahaan Company
Pajak penghasilan badan Corporate income tax
2025 933.913 933.913 2025
Jumlah 933.913 933.913 Total
Dikurangi bagian jangka pendek (933.913 ) - Less current portion
Bagian Jangka Panjang - 933.913 Non-current Portion
d. Pajak Tangguhan d. Deferred Tax
Dikreditkan pada
Dikreditkan penghasilan
(dibebankan) komprehensif lain/
pada laba rugi/ Credited to other
1 Januari/ Credited (charged) comprehensive 30 Juni/
January 2026 to profit or loss income June 2026
Aset (liabilitas) Deferred tax assets
pajak tangguhan (liabilities)
Cadangan kerugian penurunan Allowance for impairment
nilai piutang usaha dan loss on trade receivables
piutang lain-lain 8.182.016 - - 8.182.016 and other receivables
Cadangan kerugian penurunan Allowance for impairment
nilai uang muka keuangan 7.613.804 - - 7.613.804 loss of financial advances
Cadangan kerugian Allowance for impairment
penurunan nilai aset 19.204.257 - - 19.204.257 loss of assets
Liabilitas imbalan kerja 4.961.496 292.096 19.850 5.273.442 Employee
) benefits liability
Aset hak-guna (226.268 ) 33.761 - (192.507 ) Right-of-use assets
Liabilitas sewa kantor 222.710 - - 222.710 Office leased liabilities
Beda waktu Timing difference from
penyusutan depreciation of
aset tetap 1.578.613 122.980 - 1.701.593 fixed assets
Keuntungan restrukturisasi Gain from bank loan
utang bank - (72.817) - (72.817) restructuration
Jumlah 41.536.628 376.020 19.850 41.932.498 Total
Page 52
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/49 Exhibit E/49
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
21. PERPAJAKAN (Lanjutan) 21. TAXATION (Continued)
d. Pajak Tangguhan (Lanjutan) d. Deferred Tax (Continued)
Dikreditkan pada
Dikreditkan penghasilan
(dibebankan) komprehensif lain/
pada laba rugi/ Credited to other
1 Januari/ Credited (charged) comprehensive 31 Desember/
January 2025 to profit or loss income December 2025
Aset (liabilitas) Deferred tax assets
pajak tangguhan (liabilities)
Cadangan kerugian penurunan Allowance for impairment
nilai piutang usaha dan loss on trade receivables
piutang lain-lain 8.182.016 - - 8.182.016 and other receivables
Cadangan kerugian penurunan Allowance for impairment
nilai uang muka keuangan 7.613.804 - - 7.613.804 loss of financial advances
Cadangan kerugian Allowance for impairment
penurunan nilai aset 13.184.645 6.019.612 - 19.204.257 loss of assets
Liabilitas imbalan kerja 4.575.522 406.651 (20.677) 4.961.496 Employee
) benefits liability
Aset hak-guna (135.185 ) (91.083 ) - (226.268 ) Right-of-use assets
Liabilitas sewa kantor 138.035 84.675 - 222.710 Office leased liabilities
Beda waktu Timing difference from
penyusutan depreciation of
aset tetap 1.328.595 250.018 - 1.578.613 fixed assets
Keuntungan restrukturisasi Gain from bank loan
utang bank (363.688 ) 363.688 - - restructuration
Jumlah 34.523.744 7.033.561 (20.677) 41.536.628 Total
Entitas anak tidak mengakui aset pajak tangguhan The subsidiaries did not recognize deferred tax
karena tidak ada kepastian adanya laba kena pajak assets since there is uncertainty of future taxable
(laba fiskal) di masa mendatang. income (fiscal profit).
e. Surat Ketetapan Pajak e. Tax Assessment Letter
Berikut adalah ringkasan pengembalian dan The following is a summary of tax refund and
kompensasi selama tahun 2026 dan 2025. compensation during 2026 and 2025.
Surat Tanggal Jumlah
ketetapan pengembalian awal yang
Periode/tahun pajak/ diterima/ diklaim/
pajak/ Jenis Tax Date of Initial
Fiscal Perusahaan/ pajak/ assessment refund amount Jumlah pengembalian/
period/year Company Tax type letter received claimed Refund amount
Agustus/August EEI PPN/VAT Lebih bayar/ 27 Januari/ 28.830.451 Rp 28.825.771 setelah dikurangi koreksi
2025 Overpayment January 2026 PPN, sebesar Rp 4.680/
Rp 28,825,771 has been deducted by
corrections of VAT amounting to Rp 4,680
Juni/June 2025 EEI PPN/VAT Lebih bayar/ 20 Januari/ 43.478.906 Rp 43.475.540 setelah dikurangi koreksi
Overpayment January 2026 PPN, sebesar Rp 3.366/
Rp 43,475,540 has been deducted by
corrections of VAT amounting to Rp 3,366.
Maret/March EEI PPN/VAT Lebih bayar/ 22 Januari/ 41.332.902 Rp 41.327.298 setelah dikurangi koreksi
2025 Overpayment January 2026 PPN dan SKPKB PPN Juli 2025, masing-
masing sebesar Rp 1.046 dan Rp 4.558/
Rp 41,327,298 has been deducted by
corrections of VAT and SKPKB VAT July
2025, amounting to Rp 1,046 and
Rp 4,558, respectively
Maret/ EEI PPN/VAT Lebih bayar/ 15 Januari/ 40.513.657 Rp 40.510.996 setelah dikurangi koreksi
March 2024 Overpayment January 2025 atas PPN masukan sebesar Rp 2.080 dan
STP PPh 21 sebesar Rp 581/
Rp 40,510,996 has been deducted by
corrections of VAT-in and SKPKB of PPh 21
amounting to Rp 2,080 and Rp 581.
Juni/ EEI PPN/VAT Lebih bayar/ 15 Januari/ 45.001.334 Rp 45.000.308 setelah dikurangi koreksi
June 2024 Overpayment January 2025 atas PPN masukan sebesar Rp 1.026/
Rp 45,000,308 has been deducted by
corrections of VAT-in amounting to
Rp 1,026.
September/ EEI PPN/VAT Lebih bayar/ 13 Juni/ 40.743.446 Rp 40.743.446/Rp 40,743,446.
September Overpayment June 2025
2024
Page 53
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/50 Exhibit E/50
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
21. PERPAJAKAN (Lanjutan) 21. TAXATION (Continued)
e. Surat Ketetapan Pajak (Lanjutan) e. Tax Assessment Letter (Continued)
Berikut adalah ringkasan pengembalian dan The following is a summary of tax refund and
kompensasi selama tahun 2026 dan 2025 (Lanjutan). compensation during 2026 and 2025 (Continued).
Surat Tanggal Jumlah
ketetapan pengembalian awal yang
Periode/tahun pajak/ diterima/ diklaim/
pajak/ Jenis Tax Date of Initial
Fiscal Perusahaan/ pajak/ assessment refund amount Jumlah pengembalian/
period/year Company Tax type letter received claimed Refund amount
Desember/ EEI PPN/VAT Lebih bayar/ 28 Juli/ 28.823.061 Rp 28.791.987 setelah dikurangi koreksi
December 2024 Overpayment July 2025 PPN, SKPKB PPN Oktober 2024, STP PPN
Oktober 2024 dan STP PPN Desember 2024
sebesar Rp 14.929, Rp 14.143, Rp 734 dan
Rp 1.268/
Rp 28,791,987 has been deducted by
corrections of VAT, SKPKB VAT October
2024, STP VAT October 2024 and STP VAT
December 2024 amounting to Rp 14,929,
Rp 14,143, Rp 734 and Rp 1,268.
EBI (entitas anak) menerima SKPKB EBI (subsidiary) received SKPKB
No.00088/203/23/011/25 tanggal 1 September 2025, No. 00088/203/23/011/25 dated 1 September 2025,
yang memutuskan kurang bayar Pajak Penghasilan - which decided the underpayment of Income Tax -
Pasal 23 periode Januari - Desember 2023 sebesar Article 23 period January - December 2023
Rp 74.473. EBI telah membayar SKPKB pada tanggal amounting to Rp 74,473. EBI has paid SKPKB on
10 September 2025. 10 September 2025.
22. LIABILITAS IMBALAN PASCAKERJA 22. POST-EMPLOYMENT BENEFITS LIABILITIES
Grup mengakui liabilitas imbalan kerja kepada karyawan The Group recognizes employee benefit liabilities to its
sesuai dengan ketentuan minimum di dalam Peraturan employees in accordance with the minimum requirement
Pemerintah No. 35 Tahun 2021 yang mengatur mengenai in the Government Regulation No. 35 Year 2021 which
pelaksanaan dari Undang-Undang No. 11 Tahun 2020 regulates the implementation of Law No. 11 Year 2020 on
tentang “Cipta Kerja” yang telah diganti dengan Undang- “Job Creation” which has been replaced by Law No. 6
Undang No. 6 Tahun 2023 tentang “Penetapan Peraturan Year 2023 on “Stipulation of Government Regulation in
Pemerintah Pengganti Undang-Undang No. 2 Tahun 2022 Lieu of Law No. 2 Year 2022 on Job Creation into Law”.
tentang Cipta Kerja menjadi Undang-Undang”. Liabilitas The employee benefit liabilities are unfunded.
imbalan kerja tersebut tidak didanai.
Tabel berikut ini merangkum komponen-komponen atas The following tables summarize the components of
beban imbalan pascakerja neto yang diakui dalam laporan employee benefits expense recognized in the
laba rugi dan penghasilan komprehensif lain konsolidasian consolidated statement of profit or loss and other
dan jumlah yang disajikan dalam laporan posisi keuangan comprehensive income and the amounts recognized in the
konsolidasian sebagai liabilitas imbalan pascakerja consolidated statement of financial position as employee
berdasarkan penilaian aktuaria yang dilakukan oleh benefits liability as determined by an independent
aktuaris independen KKA Azwir Arifin & Rekan sesuai actuary KKA Azwir Arifin & Rekan in its report dated
dengan laporan tanggal 29 Januari 2026 untuk tahun 2025 29 January 2026 for year 2025 which also included with
yang juga dilengkapi dengan estimasi untuk periode 2026. the estimation for period 2026.
Saldo liabilitas imbalan kerja yang diakui di laporan posisi The amounts of employee benefits recognized in the
keuangan konsolidasian adalah sebagai berikut: consolidated statement of financial position are as
follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Present value of
Nilai kini liabilitas manfaat pasti 24.583.875 23.116.000 defined benefit obligation
Page 54
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/51 Exhibit E/51
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
22. LIABILITAS IMBALAN PASCAKERJA (Lanjutan) 22. POST-EMPLOYMENT BENEFITS LIABILITIES (Continued)
Mutasi nilai kini liabilitas adalah sebagai berikut: The movements in present value of obligation are as
follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Saldo awal 23.116.000 21.235.634 Beginning balance
Beban jasa kini 1.182.898 1.221.177 Current service cost
Beban bunga 184.318 732.184 Interest cost
Subjumlah 24.483.216 23.188.995 Sub-total
Diakui pada penghasilan Recognized in other
komprehensif lain: comprehensive income:
Pengukuran kembali liabilitas Remeasurement of
imbalan pasti defined benefits obligation
Dampak dari perubahan Effect of changes in
asumsi keuangan - 263.028 financial assumptions
Dampak penyesuaian atas Effect of experience
pengalaman 100.659 (299.647 ) adjustments
Subjumlah 100.659 (36.619 ) Sub-total
Pembayaran manfaat - (36.376 ) Benefits paid
Saldo akhir 24.583.875 23.116.000 Ending balance
Bagian yang jatuh tempo dalam
waktu satu tahun (16.219.157 ) (16.219.157 ) Less current maturities
Bagian jangka panjang 8.364.718 6.896.843 Long-term portion
Beban manfaat karyawan yang diakui dalam laporan laba Employee benefits expense recognized in consolidated
rugi dan penghasilan komprehensif lain konsolidasian statement of profit or loss and other comprehensive
adalah sebagai berikut: income are as follows:
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Beban jasa kini 1.182.898 466.058 Current service cost
Beban bunga 184.318 366.092 Interest cost
Beban imbalan kerja (Catatan 33) 1.367.216 832.150 Employee benefits expense (Note 33)
Asumsi utama yang digunakan oleh aktuaris adalah sebagai Key assumptions used by the actuary are as follows:
berikut:
31 Desember 2025/
31 December 2025
Tingkat diskonto 4,81% - 7,06% Discount rate
Tingkat kenaikan gaji 8% Annual salary increase
Tabel mortalitas TMI IV/ 2019 Mortality table
Tingkat sakit 1-10% Illness rate
Usia pensiun normal 55 tahun/years Normal retirement age
Analisis sensitivitas kuantitatif untuk asumsi yang Quantitative sensitivity analysis for significant
signifikan pada tanggal 31 Desember 2025 adalah sebagai assumptions as of 31 December 2025 are as follows:
berikut:
31 Desember 2025/
31 December 2025
1% Kenaikan/ 1% Penurunan/
1% Increase 1% Decrease
Tingkat diskonto Discount rate
Dampak nilai kini liabilitas Effect on present value of
manfaat pasti (264.563) 292.346 defined benefit obligation
Gaji Salary
Dampak nilai kini liabilitas Effect on present value of
manfaat pasti 284.203 (262.330) defined benefit obligation
Page 55
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/52 Exhibit E/52
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
22. LIABILITAS IMBALAN PASCAKERJA (Lanjutan) 22. POST-EMPLOYMENT BENEFITS LIABILITIES (Continued)
Analisa sensitivitas didasarkan pada perubahan atas satu The sensitivity analyses are based on a change in an
asumsi di mana asumsi lainnya dianggap konstan. Dalam assumption while holding all other assumptions constant.
prakteknya, hal ini jarang terjadi dan perubahan beberapa In practice, this is unlikely to occur, and changes in some
asumsi mungkin saling berkorelasi. Dalam perhitungan of the assumptions may be correlated. When calculating
sensitivitas liabilitas imbalan pasti atas asumsi aktuarial the sensitivity of the defined benefit obligation to
utama, metode yang sama (perhitungan nilai kini liabilitas significant actuarial assumptions the same method
imbalan pasti dengan menggunakan metode projected (present value of the defined benefit obligation
unit credit di akhir periode) telah diterapkan seperti calculated with the projected unit credit method at the
dalam penghitungan liabilitas imbalan kerja yang diakui end of the reporting period) has been applied as when
dalam laporan posisi keuangan konsolidasian. calculating the employee benefits liability recognize
within the consolidated statement of financial position.
Jatuh tempo kewajiban manfaat pasti pada tanggal The maturity of defined benefits obligations as of
31 Desember 2025 adalah sebagai berikut: 31 December 2025 are as follows:
31 Desember 2025/
31 December 2025
Dalam waktu 12 bulan berikutnya Within the next 12 months
(periode laporan periode berikutnya) 16.219.157 (the next annual reporting period)
Antara 1 dan 2 tahun 5.044.001 Between 1 and 2 years
Antara 2 dan 5 tahun 877.062 Between 2 and 5 years
Di atas 5 tahun 18.433.353 Beyond 5 years
23. CADANGAN BIAYA REKLAMASI 23. RESERVE FOR RECLAMATION COST
Sesuai dengan Peraturan Pemerintah No. 78 Tahun 2010 In accordance with the Government Regulation No. 78
yang memperbaharui Peraturan Menteri Energi dan of 2010 which superseded regulation of the Minister of
Sumber Daya Mineral (ESDM) No. 18 Tahun 2008 tanggal Energy and Mineral Resources (ESDM) No. 18 of 2008
29 Mei 2008 yang menetapkan bahwa Grup disyaratkan dated 29 May 2008 which stipulates that the Group is
untuk menyediakan jaminan untuk reklamasi tambang dan required to provide guarantee for mine reclamation and
penutupan tambang yang dapat berupa deposito mine closure in the form of a time deposit, bank
berjangka, jaminan bank, asuransi, atau accounting guarantee, insurance, or the accounting reserve with
reserve yang jangka waktunya sesuai dengan jadwal duration according to the reclamation schedule.
reklamasi.
Pada tahun 2025, Perusahaan telah melakukan pemulihan In 2025, the Company recovered the reserve for
atas cadangan biaya reklamasi sebesar Rp 20.740.410, reclamation amounting to Rp 20,740,410, because
dikarenakan Perusahaan tidak menjalankan aktivitas the Company did not conduct any mining activities
penambangan (Catatan 3). (Note 3).
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, Grup As of 30 June 2026 and 31 December 2025, the Group has
telah menghitung jaminan reklamasi berupa accounting calculated reclamation guarantees in the form of
reserve masing-masing sebesar Rp 1.382.694 dan accounting reserve amounted to Rp 1,382,694 and
Rp 2.765.388. Cadangan biaya reklamasi tersebut Rp 2,765,388, respectively. The reclamation cost
merupakan milik entitas anak (AJP dan SRI) dan belum reserves belong to the subsidiaries (AJP and SRI) and
memulai proses pertambangannya. SRI tidak dikonsolidasi mining operations have not yet commenced. SRI
efektif pada tanggal 29 April 2026 (Catatan 39). deconsolidated effective on 29 April 2026 (Note 39).
24. UTANG DIVIDEN 24. DIVIDEND PAYABLES
Berdasarkan Risalah Rapat Umum Pemegang Saham Based on the Minutes of the Annual General Meeting
Tahunan tanggal 28 Juni 2013 dan Rapat Umum Pemegang of Shareholders dated 28 June 2013 and the General
Saham Luar Biasa tanggal 28 Februari 2014 mengenai Meeting Extraordinary Shareholders dated 28 February
persetujuan pengakuan dividen tahun buku 2012, 2014 regarding the approval of dividend declaration for
Perusahaan mengumumkan pembagian dividen yang 2012, the Company declared dividends related to net
berhubungan dengan laba neto tahun buku 2012 sejumlah income for 2012 amounting to Rp 1.82 (full amount) per
Rp 1,82 (nilai penuh) per lembar saham atau sebesar share or amounting to Rp 16,314,837. Until the issuance
Rp 16.314.837. Sampai dengan laporan keuangan of these consolidated financial statements, the dividend
konsolidasian ini diterbitkan, utang dividen tersebut payables have not yet been paid.
belum dibayarkan.
Page 56
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/53 Exhibit E/53
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
25. MODAL SAHAM 25. SHARE CAPITAL
Susunan kepemilikan saham Perusahaan berdasarkan data The Company’s shareholders based on the record
dari Biro Administrasi Efek, PT Sinartama Gunita pada of shares’ registrars, PT Sinartama Gunita as of
tanggal 30 Juni 2026 dan 31 Desember 2025 adalah sebagai 30 June 2026 and 31 December 2025 are as follows:
berikut:
Persentase
Jumlah lembar kepemilikan/
saham/ Percentage of Jumlah/
Nama pemegang saham Number of shares ownership Amount Name of shareholders
Saham Seri A Series A shares
PT Saibatama Internasional Mandiri 49.824.999 0,56% 99.649.998 PT Saibatama Internasional Mandiri
Masyarakat (di bawah 5%) 65.175.001 0,73% 130.350.002 Public (less than 5%)
Jumlah saham Seri A 115.000.000 1,29% 230.000.000 Total Series A shares
Saham Seri B Series B shares
Anderson Bay Pte Ltd 4.083.459.543 45,59% 408.345.954 Anderson Bay Pte Ltd
Masyarakat (di bawah 5%) 4.757.901.663 53,12% 475.790.167 Public (less than 5%)
Jumlah saham Seri B 8.841.361.206 98,71% 884.136.121 Total Series B shares
Jumlah 8.956.361.206 100,00% 1.114.136.121 Total
Tidak ada anggota direksi maupun dewan komisaris yang None of the members of the board of directors and the
memiliki saham dalam Perusahaan. board of commissioners own shares in the Company
Manajemen Permodalan Capital Management
Tujuan utama dari pengelolaan modal Grup adalah untuk The primary objective of the Group’s capital
memastikan bahwa Grup mempertahankan rasio modal management is to ensure that it maintains healthy
yang sehat dalam rangka mendukung bisnis dan capital ratios in order to support its business and
memaksimalkan nilai pemegang saham. maximize share holder value.
Grup mengelola permodalan untuk menjaga kelangsungan The Group manages its capital to safeguard the Group’s
usahanya dalam rangka memaksimumkan imbalan hasil ability to continue as a going concern in order to
para pemegang saham dan manfaat kepada pihak lain yang maximize the return to shareholders and benefits for
berkepentingan terhadap Grup dan untuk menjaga other stakeholders, and to maintain optimal capital
struktur optimal permodalan, yaitu dengan mengacu pada structure, with reference to the same industry, to reduce
industri yang sama, untuk mengurangi biaya permodalan. the cost of capital.
Struktur permodalan Grup terdiri dari ekuitas (terdiri dari The capital structure of the Group consists of equity
modal saham, tambahan modal disetor dan defisit) utang (consists of share capital, additional paid-in capital and
bank dan liabilitas keuangan lainnya. deficits) bank loans and other financial liabilities.
Rasio liabilitas neto terhadap defisiensi modal pada Ratio of net debt to capital deficiency, as of 30 June 2026
tanggal 30 Juni 2026 dan 31 Desember 2025 adalah sebagai and 31 December 2025 are as follows:
berikut:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Jumlah liabilitas 2.051.962.379 1.955.634.974 Total liabilities
Dikurangi: kas dan bank (338.305.904 ) (254.031.368 ) Less: cash on hand and in banks
Liabilitas neto 1.713.656.475 1.701.603.606 Net liabilities
Defisiensi modal (941.483.202 ) (1.064.284.851 ) Capital deficiency
Rasio liabilitas neto terhadap Ratio of net debt to
defisiensi modal (182,02% ) (159,88% ) capital deficiency
Page 57
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/54 Exhibit E/54
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
26. TAMBAHAN MODAL DISETOR 26. ADDITIONAL PAID-IN CAPITAL
Rincian tambahan modal disetor pada tanggal The details of additional paid-in capital as of
30 Juni 2026 dan 31 Desember 2025 adalah sebagai 30 June 2026 and 31 December 2025 are as follows:
berikut:
Kelebihan dari hasil nilai nominal: Excess of proceeds over par value:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Difference in the value of
Selisih nilai transaksi restrukturisasi restructuring transactions
entitas sepengendali (749.542.930 ) (749.542.930) entities under common control
Selisih transaksi perubahan ekuitas Difference due to changes in equity
entitas anak 229.282.849 354.809.963 of subsidiaries
Penawaran umum saham - 2003 4.000.000 4.000.000 Initial public offering - 2003
Penawaran umum terbatas II - 2013 Limited public offering II - 2013
setelah dikurangi dengan biaya emisi net against share issuance
efek sebesar Rp 54.905.317 1.879.923.226 1.879.923.226 cost at Rp 54,905,317
Pengampunan pajak 3.393.900 3.393.900 Tax amnesty
Jumlah 1.367.057.045 1.492.584.159 Total
Tambahan modal disetor dari penawaran umum saham Additional paid in capital from initial public offering and
dan penawaran umum terbatas II merupakan kelebihan limited public offering II is excess of proceeds over par
dari hasil nilai nominal yang merupakan selisih antara value represents the difference between the price of the
harga saham yang ditawarkan dalam Penawaran Umum shares offered in initial public offering and the Limited
Perdana dan Penawaran Umum Terbatas yang dikurangi Public Offering reduced by share issuance costs and the
dengan biaya emisi dan nilai nominalnya. par value.
Tambahan modal disetor dari pengampunan pajak Additional paid-in capital from tax amnesty represents
merupakan penambahan aset atas pengampunan pajak additional assets in connection with Law No. 11 of 2016
sesuai dengan Undang-Undang No. 11 Tahun 2016 dan and PSAK No. 370 “Accounting for Asset and Liability from
penerapan PSAK No. 370 “Akuntansi Aset dan Liabilitas Tax Amnesty”.
Pengampunan Pajak”.
Tambahan modal disetor dari selisih nilai transaksi Additional paid-in capital from difference in value of
restrukturisasi entitas sepengendali merupakan selisih restructuring transactions under common control is
antara harga akusisi dan aset neto hasil dari transaksi difference between acquisition price and net assets of
akuisisi EBI dan entitas anak pada tahun 2013. acquisition transactions of EBI and its subsidiaries in
2013.
Tambahan modal disetor dari selisih transaksi perubahan The additional paid-in capital from difference due to
ekuitas entitas anak merupakan selisih transaksi dengan changes in equity of subsdiaries is a difference arising
kepentingan nonpengendali yang tidak mengakibatkan from transaction with non-controlling interests that does
hilangnya pengendalian. Pada tahun 2017, PT Dwi Guna not not result in loss of control. In year 2017, PT Dwi Guna
Laksana Tbk, entitas anak dari EBI melakukan penerbitan Laksana Tbk, a subsidiary of EBI issued new shares
saham baru melalui penawaran saham perdana di mana through initial public offering (IPO) in which EBI did not
EBI tidak ikut ambil bagian dengan membeli saham baru participate in purchasing PT Dwi Guna Laksana Tbk’s new
PT Dwi Guna Laksana Tbk. Akibatnya, EBI mengalami shares. As a result, EBI became share dilution. This
dilusi saham. Transaksi ini dianggap sebagai transaksi transaction is considered as equity transaction and cannot
ekuitas dan tidak dapat di catat ke laporan laba rugi dan be recorded in consolidated statement of profit or loss
penghasilan komprehensif lain konsolidasian ketika and other comprehensive income when share ownership
kepemilikan saham di PT Dwi Guna Laksana Tbk telah in PT Dwi Guna Laksana Tbk is completely transferred.
dialihkan seluruhnya. Oleh karena itu, selisih transaksi Therefore, difference due to changes in equity of
perubahan ekuitas entitas anak direklasifikasi ke subsidiaries is reclassified to additional paid-in capital
tambahan modal disetor ketika kepemilikan saham di when shares ownership in PT Dwi Guna Laksana Tbk was
PT Dwi Guna Laksana Tbk telah dialihkan pada tahun completely transferred in year 2019. PT Dwi Guna
2019. PT Dwi Guna Laksana Tbk tidak dikonsolidasi efektif Laksana Tbk deconsolidated effective on 12 April 2019.
pada 12 April 2019.
Penurunan tambahan modal disetor dari selisih transaksi The decrease of additional paid-in capital from
perubahan ekuitas entitas anak merupakan dampak dari difference due to changes in equity of subsdiaries
penjualan investasi pada entitas anak (Catatan 39). represents the impact of sale of investment in subsidiary
(Note 39).
Page 58
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/55 Exhibit E/55
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
27. SELISIH TRANSAKSI DENGAN PIHAK NONPENGENDALI 27. DIFFERENCE ARISING FROM TRANSACTIONS WITH NON-
CONTROLLING INTEREST
Selisih transaksi dengan pihak nonpengendali pada tanggal Difference arising from transactions with non-controlling
30 Juni 2026 dan 31 Desember 2025 adalah sebagai interest as of 30 June 2026 and 31 December 2025 is as
berikut: follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Selisih dengan pihak nonpengendali Difference with non-controlling
sehubungan dengan pengampunan interest in connection with
pajak dari entitas anak (340.590 ) (340.590 ) tax amnesty
Dampak perubahan saham Effect of changes in subsidiaries’s
di entitas anak - neto (17.697.486 ) (117.218.795 ) share capital - net
)
Jumlah (18.038.076 ) (117.559.385 ) Total
Penurunan saldo selisih transaksi kepentingan The decrease on difference arising from transaction with
nonpengendali merupakan dampak dari penjualan non-controlling interest balance represents the impact of
investasi pada entitas anak (Catatan 1d, 39). sale of investment in subsidiary (Note 1d, 39).
28. SALDO DAN SIFAT TRANSAKSI DAN HUBUNGAN DENGAN 28. BALANCES AND NATURE OF TRANSACTIONS AND
PIHAK-PIHAK BERELASI RELATIONSHIPS WITH RELATED PARTIES
Saldo dan transaksi dengan pihak-pihak berelasi adalah Balances and transactions with related parties are as
sebagai berikut: follows:
a. Piutang Lain-lain (Catatan 6) a. Other Receivables (Note 6)
Rincian piutang lain-lain dengan pihak berelasi atas Details of other receivables from related parties for
transaksi di luar usaha pokok Grup adalah sebagai transactions outside the Group’s main business are as
berikut: follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
PT Saibatama Internasional Mandiri 39.296.378 49.412.587 PT Saibatama Internasional Mandiri
Tn. Andri Cahyadi 21.720.965 21.720.965 Mr. Andri Cahyadi
Tn. Henri Setiadi 596.000 596.000 Mr. Henri Setiadi
Lain-lain 600.000 600.000 Others
Subjumlah 62.213.343 72.329.552 Sub-total
Dikurangi: Less:
Cadangan kerugian penurunan
nilai (62.213.343 ) (72.329.552 ) Allowance for impairment losses
Neto - - Net
Persentase terhadap jumlah aset - - Percentage to total assets
Piutang lain-lain - pihak berelasi terutama berasal dari The other receivables - related parties mainly arose
pemberian pinjaman dan biaya penggantian. Piutang from loans and expense reimbursement. These other
lain-lain tidak memiliki jaminan, tidak berbunga dan receivables are unsecured in nature, bear no interest
tidak ada jadwal pembayaran tetap. and no fixed repayment schedule.
Pada tanggal 30 Juni 2026 dan 31 Desember 2025, As of 30 June 2026 and 31 December 2025,
manajemen telah mencadangkan seluruh saldo piutang management has reserved all other receivables
lain-lain untuk menutup kerugian yang terjadi atas balances to cover possible losses from the non-
tidak tertagihnya piutang lain-lain. collection of other receivables.
Page 59
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/56 Exhibit E/56
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
28. SALDO DAN SIFAT TRANSAKSI DAN HUBUNGAN DENGAN 28. BALANCES AND NATURE OF TRANSACTIONS AND
PIHAK-PIHAK BERELASI (Lanjutan) RELATIONSHIPS WITH RELATED PARTIES (Continued)
b. Utang Lain-lain (Catatan 18) b. Other Payables (Note 18)
Rincian utang lain-lain dengan pihak berelasi atas Details of other payables to related party for
transaksi di luar usaha pokok Grup adalah sebagai transactions outside the Group’s main business are as
berikut: follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Tn. Andri Cahyadi 35.461.715 35.461.715 Mr. Andri Cahyadi
PT Banua Antang Raya - 300.000 PT Banua Antang Raya
Jumlah 35.461.715 35.761.715 Total
Persentase terhadap Percentage to
jumlah liabilitas 1,73% 1,83% total liabilities
Tn. Andri Cahyadi Mr. Andri Cahyadi
Berdasarkan Surat Pengakuan Utang tanggal Based on Letter of Debt Acknowlegment dated
6 Januari 2010 dan Adendum Surat Pengakuan Utang 6 January 2010, and Addendum Letter of Debt
tanggal 4 Oktober 2012, Perusahaan memperoleh Acknowledgment dated 4 October 2012, the Company
pinjaman tanpa bunga dari Tn. Andri Cahyadi yang obtained a non-interest bearing loan from Mr. Andri
akan jatuh tempo dalam waktu 10 (sepuluh) tahun Cahyadi which will be due in 10 (ten) years since
sejak tanggal 1 Januari 2010. 1 January 2010.
Surat Pengakuan Utang di atas telah mengalami The above Letter of Debt Acknowledgment has been
beberapa kali perubahan dengan perubahan terakhir amended several times with latest amendment on
tanggal 19 November 2015 yang mengubah tanggal 19 November 2015 which changes the due date to
jatuh tempo menjadi 4 November 2018. become 4 November 2018.
Sifat hubungan dan transaksi dengan pihak-pihak berelasi The nature of relationship and transaction with related
adalah sebagai berikut: parties are as follows:
Pihak Berelasi/ Sifat Hubungan/ Sifat Transaksi/
Related Parties Nature of Relationship Type of Transaction
PT Saibatama Internasional Mandiri Pemegang saham/ Piutang lain-lain/
Shareholder Other receivable
Tn./Mr. Andri Cahyadi Manajemen kunci entitas pemegang saham/ Piutang lain-lain dan utang lain-lain/
Key management of shareholder entity Other receivable and other payable
Tn./Mr. Henri Setiadi Anggota keluarga dari manajemen kunci Piutang lain-lain/
entitas pemegang saham/ Other receivable
Family member from key management of
shareholder entity
PT Banua Antang Raya*) Salah satu pemegang saham entitas anak/ Utang lain-lain/Other payable
One of shareholder of subsidiaries
*) Per 29 April 2026, PT Banua Antang Raya bukan merupakan pihak berelasi/
As of 29 April 2026, PT Banua Antang Raya is not a related party.
29. KEPENTINGAN NONPENGENDALI 29. NON-CONTROLLING INTEREST
Kepentingan nonpengendali atas liabilitas neto Entitas Non-controlling interest in Subsidiaries’ net liabilities are
Anak adalah sebagai berikut: as follows:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
PT Energi Batubara Indonesia 69.164 54.746 PT Energi Batubara Indonesia
PT Korporindo Guna Bara (774.649 ) (549.454) PT Korporindo Guna Bara
PT Sekti Rahayu Indah (Catatan 39) - (26.210.666) PT Sekti Rahayu Indah (Note 39)
Jumlah (705.485 ) (26.705.374) Total
Page 60
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/57 Exhibit E/57
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
29. KEPENTINGAN NONPENGENDALI (Lanjutan) 29. NON-CONTROLLING INTEREST (Continued)
Berikut adalah ringkasan informasi keuangan entitas anak Set out below is the summarized financial information
dari Grup yang memiliki kepentingan nonpengendali yang for the Group subsidiaries that have non-controlling that
material terhadap Grup. are material to the Group.
Ringkasan laporan posisi keuangan: Summarised statement of financial position:
30 Juni/June 2026
PT Energi Batubara PT Korporindo
Indonesia Guna Bara
Aset Assets
Aset lancar 183.108.247 499.625 Current assets
Aset tidak lancar 23.796.718 23.796.724 Non-current assets
Jumlah aset 206.904.965 24.296.349 Total assets
Liabilitas Liabilities
Liabilitas jangka pendek 194.550.953 65.635.769 Current liabilities
Liabilitas jangka Panjang 288.656.374 107.601.213 Non-current liabilities
Jumlah liabilitas 483.207.327 173.236.982 Total liabilities
Liabilitas neto (276.302.362) (148.940.633 ) Net liabilities
Diatribusikan kepada: Attributable to:
Pemilik entitas induk (276.371.526) (148.165.984 ) Owners of the parent entity
Kepentingan nonpengendali 69.164 (774.649) Non-controlling interest
31 Desember/December 2025
PT Sekti Rahayu PT Korporindo
Indah Guna Bara
Aset Assets
Aset lancar 330.731 118.702 Current assets
Aset tidak lancar - 29.729.767 Non-current assets
Jumlah aset 330.731 29.848.469 Total assets
Liabilitas Liabilities
Liabilitas jangka pendek 256.074.594 70.663.278 Current liabilities
Liabilitas jangka Panjang 1.382.694 120.092.082 Non-current liabilities
Jumlah liabilitas 257.457.288 190.755.360 Total liabilities
Liabilitasi neto (257.126.557) (160.906.891 ) Net liabilities
Diatribusikan kepada: Attributable to:
Pemilik entitas induk (230.915.891) (160.357.437 ) Owners of the parent entity
Kepentingan nonpengendali (26.210.666) (549.454) Non-controlling interest
Penurunan modal dasar Decrease in authorized capital
pada entitas anak (3.430.000) - in subsidiary
Penyesuaian piutang setoran modal Adjustment of receivable on
pada entitas anak 498.000 - share capital in subsidiary
Page 61
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/58 Exhibit E/58
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
29. KEPENTINGAN NONPENGENDALI (Lanjutan) 29. NON-CONTROLLING INTEREST (Continued)
Ringkasan laporan laba rugi dan penghasilan komprehensif Summarized statement of profit or loss and other
lain: comprehensive income:
30 Juni/June 2026
PT Energi Batubara PT Korporindo
Indonesia Guna Bara
Laba (rugi) periode berjalan 55.288.840 (6.031.177 ) Profit (loss) for the period
Penghasilan komprehensif lain 10.430 (2.565 ) Other comprehensive income
Jumlah laba (rugi) komprehensif Total comprehensive
periode berjalan 55.299.270 (6.033.742 ) income (loss) for the period
Diatribusikan kepada Attributable to
kepentingan nonpengendali 14.418 (18.940 ) non-controlling interests
31 Desember/December 2025
PT Sekti Rahayu PT Korporindo
Indah Guna Bara
Laba (rugi) tahun berjalan 590.509 (11.792.482 ) Profit (loss) for the year
Penghasilan komprehensif lain - (9.201 ) Other comprehensive income
Jumlah laba (rugi) komprehensif Total comprehensive
tahun berjalan 590.509 (11.801.683 ) income (loss) for the year
Diatribusikan kepada Attributable to
kepentingan nonpengendali 968.330 (145.209 ) non-controlling interests
Ringkasan laporan arus kas: Summarised statement of cash flows:
30 Juni/June 2026
PT Energi Batubara PT Korporindo
Indonesia Guna Bara
Kas Neto Digunakan untuk (829.143 ) (118.911 ) Net Cash Used in
Aktivitas Operasi Operating Activities
Kas Neto Diperoleh dari (Digunakan Net Cash Provided by
untuk) Aktivitas Investasi 2.016.517 (12.500.000 ) (Used in) Investing Activities
Kas Neto Diperoleh dari Net Cash Provided by
Aktivitas Pendanaan - 13.000.000 Financing Activities
Kenaikan Neto Bank 1.187.374 381.089 Net Increase in Bank
Bank Awal Periode 1.387.313 118.536 Bank at Beginning of the Period
Bank Akhir Periode 2.574.687 499.625 Bank at Ending of the Period
31 Desember/December 2025
PT Sekti Rahayu PT Korporindo
Indah Guna Bara
Kas Neto Digunakan untuk (477.042 ) (213.087 ) Net Cash Used in
Aktivitas Operasi Operating Activities
Kas Neto Digunakan untuk - (25.000.000 ) Net Cash Used in
Aktivitas Investasi Investing Activities
Kas Neto Diperoleh dari Net Cash Provided by
Aktivitas Pendanaan 479.276 25.321.395 Financing Activities
Kenaikan Neto Bank 2.234 108.308 Net Increase in Bank
Bank Awal Tahun 325.774 10.228 Bank at Beginning of the Year
Bank Akhir Tahun 328.008 118.536 Bank at Ending of the Year
Page 62
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/59 Exhibit E/59
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
30. LABA PER SAHAM DASAR 30. BASIC PROFIT PER SHARE
Perhitungan laba per saham dasar adalah sebagai berikut: The calculation of basic profit per share as follows:
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Laba untuk periode berjalan yang dapat Profit for the period attributable
diatribusikan kepada pemilik entitas to the owners of parent entity
induk (nilai penuh) 122.888.369.240 125.722.783.851 (full amount)
Jumlah rata-rata tertimbang saham Weighted average number of
yang beredar 8.956.361.206 8.956.361.206 shares outstanding
Laba dasar per saham (nilai penuh) 13,72 14,04 Basic profit per share (full amount)
Perusahaan tidak mempunyai potensi saham biasa yang The Company has no outstanding potential dilutive
bersifat dilutif pada tanggal-tanggal pelaporan. Oleh ordinary shares at reporting dates. Therefore, no diluted
karenanya, laba per saham dilusian tidak dihitung dan profit per share is calculated and presented in the
disajikan pada laporan laba rugi dan penghasilan consolidated statement of profit or loss and other
komprehensif lain konsolidasian. comprehensive income.
31. PENDAPATAN USAHA 31. OPERATING REVENUES
Rincian pendapatan usaha Grup adalah sebagai berikut: The details of the Group’s operating revenues are as
follows:
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Penjualan batu bara 1.012.653.539 1.038.719.707 Coal sales
Pendapatan PLTU - Pangkalan Bun 10.843.794 8.150.830 Revenue from PLTU - Pangkalan Bun
Jumlah 1.023.497.333 1.046.870.537 Total
Pelanggan dengan jumlah penjualan kumulatif melebihi The customers with cumulative sales which exceeded 10%
10% dari jumlah pendapatan usaha adalah sebagai berikut: of total revenues are as follows:
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Persentase dari Persentase dari
jumlah pendapatan jumlah
usaha/ pendapatan usaha/
Jumlah/ Percentage to Jumlah/ Percentage to
Total total revenues Total total revenues
Pihak ketiga Third parties
PT PLN Indonesia
PT PLN Indonesia Power 618.275.975 60,41% 638.315.099 60,97% Power
PT PLN Nusantara
PT PLN Nusantara Power 394.377.564 38,53% 400.404.608 38,25% Power
Jumlah 1.012.653.539 98,94% 1.038.719.707 99,22% Total
Page 63
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/60 Exhibit E/60
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
32. BEBAN POKOK PENDAPATAN 32. COST OF REVENUES
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Persediaan batu bara Coal inventories
Saldo awal 47.100.987 41.584.158 Beginning balance
Pembelian 611.269.425 569.441.570 Purchases
Pemakaian sendiri (12.363.440 ) (11.699.776 ) Internal use
Tersedia untuk dijual 646.006.972 599.325.952 Available for sale
Saldo akhir (Catatan 7) (9.587.139 ) (23.325.714 ) Ending balance (Note 7)
Subjumlah 636.419.833 576.000.238 Sub-total
Beban tidak langsung Indirect costs
Biaya pengangkutan 207.841.516 220.494.327 Freight in
Asuransi 16.084.303 - Insurance
Pemakaian batu bara 12.363.440 11.699.776 Coal consumption
Perawatan 1.836.110 1.178.104 Maintenance
Biaya pajak 1.409.751 1.253.377 Tax expense
Penyusutan aset tetap (Catatan 9) 1.176.661 7.109.956 Depreciation of fixed assets (Note 9)
Denda keterlambatan 830.741 760.011 Demurrage penalty
Bongkar, muat dan angkut lainnya 664.347 664.618 Loading, unloading and other freight
Lain-lain (masing-masing Others (each below
di bawah Rp 500.000) 1.651.231 1.786.157 Rp 500,000)
Subjumlah 243.858.100 244.946.326 Sub-total
Jumlah 880.277.933 820.946.564 Total
Pembelian yang melebihi 10% dari jumlah pendapatan Purchases which are more than 10% of the total revenues
adalah sebagai berikut: are as follows:
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Persentase dari Persentase dari
jumlah jumlah
pendapatan/ pendapatan/
Jumlah/ Percentage to Jumlah/ Percentage to
Total total revenues Total total revenues
Pihak ketiga Third party
PT Borneo Indobara 600.218.984 58,64% 559.037.221 53,40% PT Borneo Indobara
Jumlah 600.218.984 58,64% 559.037.221 53,40% Total
33. BEBAN UMUM DAN ADMINISTRASI 33. GENERAL AND ADMINISTRATIVE EXPENSES
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Gaji dan tunjangan 24.308.478 24.273.195 Salaries and allowances
Tenaga ahli 5.072.002 4.164.403 Professional fees
Penyusutan aset tetap (Catatan 9) 2.923.660 2.884.594 Depreciation of fixed assets (Note 9)
Administrasi 1.607.332 1.740.105 Administration
Imbalan pascakerja (Catatan 22) 1.367.216 832.150 Post-employment benefits (Note 22)
Penyusutan aset hak-guna Depreciation right-of-use asset
(Catatan 10) 360.558 269.934 (Note 10)
Akomodasi dan perjalanan 215.661 355.709 Accommodation and travel
Pajak 162.433 57.983 Taxes
Lain-lain (masing-masing Others (each below
di bawah Rp 100.000) 889.921 913.084 Rp 100,000)
Jumlah 36.907.261 35.491.157 Total
Page 64
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/61 Exhibit E/61
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
34. BEBAN BUNGA DAN KEUANGAN LAINNYA 34. INTEREST AND OTHER FINANCIAL CHARGES
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Bunga liabilitas keuangan lainnya 18.217.553 20.180.648 Interest on other financial liabilities
Bunga pinjaman bank 5.926.327 10.066.825 Bank loan interest
Bunga atas liabilitas sewa (Catatan 10) 36.495 24.158 Interest on lease liabilities (Note 10)
Administrasi bank 11.150 10.528 Bank administration
Bunga sewa pembiayaan 6.748 16.943 Interest on financing liabilities
Jumlah 24.198.273 30.299.102 Total
35. PENDAPATAN LAIN-LAIN - NETO 35. OTHER INCOME - NET
30 Juni 2026/ 30 Juni 2025/
30 June 2026 30 June 2025
Keuntungan pelepasan entitas anak Gain from disposal of subsidiary
(Catatan 39) 62.024.393 - (Note 39)
Keuntungan penjualan aset tetap Gain from sale of fixed assets
(Catatan 9) 60.537 - (Note 9)
Penurunan nilai aset tetap Allowance for impairment of
(Catatan 9) (4.015.215 ) - fixed assets (Note 9)
Keuntungan atas penjualan reksadana - 907.244 Gain on sale of mutual fund
Lain-lain - neto 1.016.931 1.597.057 Others - net
Neto 59.086.646 2.504.301 Net
36. SEGMEN OPERASI 36. OPERATING SEGMENTS
Manajemen telah menentukan segmen operasi didasarkan Management has determined the operating segments
pada laporan yang ditelaah oleh Direksi, yang telah based on reports reviewed by the Board of Directors,
diidentifikasikan sebagai pengambil keputusan operasional which has been identified as the Group’s chief operating
utama Grup, yang digunakan dalam mengambil keputusan decision maker, which makes strategic decisions.
strategis.
Direksi mempertimbangkan operasi bisnis dari perspektif The Board of Directors considers the business operation
jenis bisnis yang terdiri dari penjualan batu bara, jasa by business type perspective which comprises sales of
sewa kapal, PLTU dan lainnya. coal, vessel lease service, PLTU and others.
Informasi segmen yang diberikan kepada Direksi untuk The segment information provided to the Board of
pelaporan segmen adalah sebagai berikut: Directors for the reportable segments are as follows:
30 Juni 2026/30 June 2026
Jasa sewa Segmen
Perdagangan kapal/ PLTU/ lainnya/
batu bara/ Vessel lease Steam power Other Eliminasi/ Konsolidasian/
Coal trading services Plant segment Eliminations Consolidated
Pendapatan neto 1.012.653.539 - 10.843.794 - - 1.023.497.333 Net revenues
Jumlah 1.012.653.539 - 10.843.794 - - 1.023.497.333 Total
Beban pokok
pendapatan (855.713.144) - (24.564.789) - - (880.277.933) Cost of revenues
Beban General and
umum dan administrative
administrasi (35.904.911) - (1.002.350) - - (36.907.261) expenses
Penghasilan bunga 553.642 - - - - 553.642 Interest income
Beban bunga dan Interest and other
keuangan lainnya (24.198.273) - - - - (24.198.273) financial charges
Pendapatan lain-lain 59.086.646 - - - - 59.086.646 Other income
Beban pajak
penghasilan (18.886.246) - - - - (18.886.246) Income tax expense
Laba periode berjalan 137.591.253 - (14.723.345) - - 122.867.908 Profit for the period
Penyusutan (2.388.567) - (986.006) (725.748) - (4.100.321) Depreciation
Aset segmen 1.524.226.470 1.441.642 16.794.118 11.251.878 (443.234.931) 1.110.479.177 Segment assets
Liabilitas segmen 1.964.827.829 254.882.558 12.100.233 661.500 (180.509.741) 2.051.962.379 Segment liabilities
Page 65
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/62 Exhibit E/62
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
36. SEGMEN OPERASI (Lanjutan) 36. OPERATING SEGMENTS (Continued)
30 Juni 2025/30 June 2025
Jasa sewa Segmen
Perdagangan kapal/ PLTU/ lainnya/
batu bara/ Vessel lease Steam power Other Eliminasi/ Konsolidasian/
Coal trading services Plant segment Eliminations Consolidated
Pendapatan neto 1.038.719.707 - 8.150.830 - - 1.046.870.537 Net revenues
Jumlah 1.038.719.707 - 8.150.830 - - 1.046.870.537 Total
Beban pokok
pendapatan (807.618.612) - (13.327.952) - - (820.946.564) Cost of revenues
Beban General and
umum dan administrative
administrasi (34.572.428) - (918.729) - - (35.491.157) expenses
Penghasilan bunga 173.085 - - - - 173.085 Interest income
Beban bunga dan Interest and other
keuangan lainnya (30.299.102) - - - - (30.299.102) financial charges
Pendapatan lain-lain 2.504.301 - - - - 2.504.301 Other income
Beban pajak
penghasilan (36.054.026) - - - - (36.054.026) Income tax expense
Laba periode berjalan 132.852.925 - (6.095.851) - - 126.757.074 Profit for the period
Penyusutan (2.349.502) - (6.919.300) (725.748) - (9.994.550) Depreciation
Aset segmen 1.814.524.191 6.050.268 94.429.541 12.322.062 (842.971.053) 1.084.355.009 Segment assets
Liabilitas segmen 2.542.404.216 290.597.734 5.798.280 661.500 (624.434.778) 2.215.026.952 Segment liabilities
37. PERJANJIAN DAN KOMITMEN PENTING 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
a. PT PLN (Persero) a. PT PLN (Persero)
Berdasarkan amendemen Power Purchase Agreement Based on amended Power Purchase Agreement
(PPA) tanggal 10 Januari 2011, Perusahaan dan PT dated 10 January 2011, the Company and
Perusahaan Listrik Negara (PLN) (Persero) menyetujui PT Perusahaan Listrik Negara (PLN) (Persero),
penyesuaian harga pembelian Tenaga Listrik PLTU agreed to a purchase price adjustment for PLTU
Pangkalan Bun 2x5,5 MW. Pangkalan Bun 2x5.5 MW.
Berita Acara Hasil Renegosiasi Usulan Perubahan Minutes of the Renegotiation regarding the
Harga dan Kondisi Perjanjian Pembelian Tenaga Proposed Changes in Purchase Price and Power
Listrik PLTU masing-masing sebagai berikut: Purchase Agreement Conditions for PLTU are as
follows:
(i) No. 03/BA/PBUN/TIM1/2010 untuk PLTU (i) No. 03/BA/PBUN/TIM1/2010 for PLTU
Pangkalan Bun, Kalimatan Tengah (2x5,5) MW Pangkalan Bun, Kalimantan Tengah (2x5.5) MW
tanggal 08 Juni 2010; on 8 June 2010;
(ii) No. 02/BA/121/TIM3/2010 untuk PLTU Rengat, (ii) No. 02/BA/121/TIM3/2010 for PLTU Rengat,
Riau (2x5,5) MW tanggal 10 Juni 2010; Riau (2x5.5) MW on 10 June 2010;
(iii) No. 03/BA/121/TIM3/2010 untuk PLTU (iii) No. 03/BA/121/TIM3/2010 for PLTU
Tembilahan, Riau (2x5,5) MW tanggal 10 Juni Tembilahan, Riau (2x5.5) MW on 10 June 2010;
2010;
(iv) PLTU Pangkalan Bun, Kalimantan Tengah. (iv) PLTU Pangkalan Bun, Central Kalimantan.
Harga dasar/Base price
(Nilai penuh/Full amount)
Komponen/ Tahun/ Sebelum renegosiasi/ Hasil renegosiasi/
Component Years Before renegotiation Result of renegotiation
A 1–5 310 438
A 6 – 10 243 219
A 11 – 15 194 175.20
A 16 – 20 189 175.20
A 21 – 25 182 175.20
B 1 – 25 40 40
C 1 – 25 216 Pass- through
D 1 – 25 10 10
Tarif levelized ABCD/Levelized ABCD tarif 519,91 357,11
Page 66
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/63 Exhibit E/63
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
37. PERJANJIAN DAN KOMITMEN PENTING (Lanjutan) 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
(Continued)
a. PT PLN (Persero) (Lanjutan) a. PT PLN (Persero) (Continued)
(v) PLTU Rengat, Riau (v) PLTU Rengat, Riau
Harga dasar/Base price
(Angka penuh/Full amount)
Komponen/ Tahun/ Sebelum renegosiasi/ Hasil renegosiasi/
Component Years Before renegotiation Result of renegotiation
A 1–5 310 532
A 6 – 10 243 152
A 11 – 15 194 121,00
A 16 – 20 189 117,00
A 21 – 25 182 113,00
B 1 – 25 40 40
C 1 – 25 216 Pass-through
D 1 – 25 10 10
Tarif levelized ABCD/Levelized ABCD tarif 519,91 -
Tarif levelized ABD/Levelized ABD tarif 303,91 349,79
(vi) PLTU Tembilahan, Riau (vi) PLTU Tembilahan, Riau
Harga dasar/Base price
(Angka penuh/Full amount)
Komponen/ Tahun/ Sebelum renegosiasi/ Hasil renegosiasi/
Component Years Before renegotiation Result of renegotiation
A 1–5 310 532
A 6 – 10 243 152
A 11 – 15 194 121,00
A 16 – 20 189 117,00
A 21 – 25 182 113,00
B 1 – 25 40 40
C 1 – 25 216 Pass-through
D 1 – 25 10 10
Tarif levelized ABCD/Levelized ABCD tarif 519,91 -
Tarif levelized ABD/Levelized ABD tarif 303,91 349,79
Berdasarkan Master Agreement (MA) of Power Based on the Master Agreement (MA) of the Power
Purchase Agreement tanggal 21 Maret 2007 antara Purchase Agreement dated 21 March 2007, between
Perusahaan dengan PLN, Perusahaan akan the Company and PLN, the Compary will build a coal
membangun pembangkit listrik berbahan bakar batu fired power plant with a capacity 2x5.5 MW in
bara (steam power plant) dengan kapasitas 2x5,5 MW Pangkalan Bun, Kalimantan Tengah, Rengat and
yang berlokasi di Pangkalan Bun, Kalimantan Tengah, Tembilahan, Riau. PLN will build transmission
Rengat, dan Tembilahan, Riau. PLN akan membangun network with capacity of 20 kV which will carry the
jaringan transmisi 20 kV yang mengalirkan energi flowof electricity from power plant to the nearest
listrik dari pembangkit listrik ke sistem jaringan PLN PLN system.
terdekat.
Perjanjian ini berlaku selama 25 tahun dengan harga This agreement is valid for 25 years from the
jual dengan tarif dasar Rp 519,91 (nilai penuh) per agreement date, at a rate of Rp 519.91 (full
kWh dengan potongan harga 10% per tahun. Harga ini amount) per kWh with discount of 10% per annum.
akan berubah, tergantung perubahan komponen dari The rate is subject to changes, depending on the
harga jual. price changes of the components of the sales price.
Page 67
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/64 Exhibit E/64
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
37. PERJANJIAN DAN KOMITMEN PENTING (Lanjutan) 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
(Continued)
a. PT PLN (Persero) (Lanjutan) a. PT PLN (Persero) (Continued)
Dalam perjanjian tersebut, PLN bersedia untuk Based on agreement, PLN agreed to purchase the
membeli tenaga listrik dengan harga Rp 448 (nilai electricity at a price of Rp 448 (full amount) per
penuh) per kWh tidak termasuk PPN, terhitung sejak kWh excluding Value Added Tax starting from
operasi komersial dan kelayakan operasi yang commercial operation and based on the acceptance
dinyatakan oleh pihak yang berwenang dengan dibuat certificate signed by both parties. This agreement
berita acara yang ditandatangani oleh kedua belah letter has been replaced with MA.
pihak. Surat perjanjian ini telah diganti dengan MA.
Berdasarkan surat No. 1624/KON.01.10/DITREG- Based on letter from No. 1624/KON.01.10/DITREG-
SUM/2016 pada tanggal 28 Desember 2016 dari SUM/2016 on 28 December 2016 from PT PLN
PT PLN (Persero) tentang pemberitahuan pengakhiran (Persero) is giving termination notice to the
perjanjian (Termination Notice) kepada Perusahaan Company as seller failed to achieve commercial
sebagai penjual karena tidak dapat mencapai tanggal operation date of PLTU Tembilahan within 180 days
operasi komersial PLTU Tembilahan pada waktu 180 following the required Commercial Operating Date,
hari setelah tanggal required COD yang jatuh pada which is due on 27 February 2015. Termination
tanggal 27 Februari 2015. Pengakhiran perjanjian agreement due on the 30 days after the date of this
tersebut jatuh tempo pada waktu 30 hari setelah letter.
tanggal surat ini.
Berdasarkan surat No. 0001/KON.01.09/DITREG- Based on letter from No. 0001/KON.01.09/DITREG-
SUM/2016 pada tanggal 4 Januari 2016 dari PT PLN SUM/2016 on 4 January 2016 from PT PLN (Persero)
(Persero) tentang pemberitahuan pengakhiran is giving termination notice to the Company as
perjanjian (Termination Notice) kepada Perusahaan seller failed to achieve commercial operation date
sebagai penjual karena tidak dapat mencapai tanggal of PLTU Rengat within 180 days following the
operasi komersial PLTU Rengat pada waktu 180 hari required Commercial Operating Date, which is due
setelah tanggal required COD yang jatuh pada tanggal on 30 October 2015. Termination agreement due on
30 Oktober 2015. Pengakhiran perjanjian tersebut the 30 days after the date of this letter.
jatuh tempo pada waktu 30 hari setelah tanggal surat
ini.
b. Perjanjian Kerja Sama Pembangunan Pembangkit b. Mutual Agreement Coal fired Steam Power Plant
Listrik Tenaga Uap Construction
i. Shandong Huatai Engineering Co., Ltd. i. Shandong Huatai Engineering Co., Ltd.
Berdasarkan Surat Perjanjian empat (4) pihak Based on Agreement of four (4) parties between
antara Perusahaan dengan PT Asian Tec Indonesia the Company with PT Asian Tec Indonesia
dan Shandong Huatai Engineering Co., Ltd., dan and Shandong Huatai Engineering Co., Ltd., and
PT Anugrah Lestari Konstruksi Nusantara tanggal PT Anugrah Lestari Konstruksi Nusantara
27 November 2012, Perusahaan mengadakan 27 November 2012, the Company entered into a
kontrak perjanjian dengan PT Anugrah Lestari contract agreement with PT Asian Tec Indonesia
Konstruksi Nusantara tentang pekerjaan on power plant construction work in the area
pembangunan PLTU di daerah Tembilahan dan Tembilahan and Rengat, both located in the
Rengat, keduanya terletak di Propinsi Riau province of Riau with a contract value of each of
dengan nilai kontrak masing-masing sebesar USD 12,455,000 (full amount), respectively.
USD 12.455.000 (angka penuh). Jangka waktu Period of work started since 27 November 2012
pekerjaan dimulai sejak 27 November 2012 sampai until the signing of the Minutes of Settlement
dengan Penandatanganan Berita Acara Works (Note 37a point (v) and (vi)).
Penyelesaian Pekerjaan (Catatan 37a poin (v) dan
(vi)).
Page 68
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/65 Exhibit E/65
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
37. PERJANJIAN DAN KOMITMEN PENTING (Lanjutan) 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
(Continued)
b. Perjanjian Kerja Sama Pembangunan Pembangkit b. Mutual Agreement Coal fired Steam Power Plant
Listrik Tenaga Uap (Lanjutan) Construction (Continued)
ii. PT Asian Tec Indonesia ii. PT Asian Tec Indonesia
Berdasarkan Surat Perjanjian empat (4) Based on Agreement of four (4) parties between
pihak antara Perusahaan dengan PT Asian the Company with PT Asian Tec Indonesia
Tec Indonesia dan Shandong Huatai Engineering and Shandong Huatai Engineering Co., Ltd.,
Co., Ltd., dan PT Anugrah Lestari Konstruksi and PT Anugrah Lestari Konstruksi Nusantara
Nusantara tanggal 27 November 2012, Perusahaan 27 November 2012, the Company entered into a
mengadakan kontrak perjanjian dengan contract agreement with PT Asian Tec Indonesia
PT Anugrah Lestari Konstruksi Nusantara tentang on power plant construction work in the area
pekerjaan pembangunan PLTU di daerah Tembilahan and Rengat, both located in the
Tembilahan dan Rengat, keduanya terletak di province of Riau with a contract value of each
Propinsi Riau dengan nilai kontrak masing-masing of Rp 29,788,464, respectively. Period of work
sebesar Rp 29.788.464. Jangka waktu pekerjaan started since 27 November 2012 until the signing
dimulai sejak 27 November 2012 sampai dengan of the Minutes of Settlement Works (Note 37a
Penandatanganan Berita Acara Penyelesaian point (v) and (vi)).
Pekerjaan (Catatan 37a poin (v) dan (vi)).
iii. PT Anugrah Lestari Konstruksi Nusantara iii. PT Anugrah Lestari Konstruksi Nusantara
Berdasarkan Surat Perjanjian empat (4) pihak Based on Agreement of four (4) parties between
antara Perusahaan dengan PT Asian Tec Indonesia the Company with PT Asian Tec Indonesia and
dan Shandong Huatai Engineering Co., Ltd., dan Shandong Huatai Engineering Co., Ltd., and
PT Anugrah Lestari Konstruksi Nusantara tanggal PT Anugrah Lestari Konstruksi Nusantara
27 November 2012, Perusahaan mengadakan 27 November 2012, the Company entered into a
kontrak perjanjian dengan PT Anugrah Lestari contract agreement with PT Asian Tec Indonesia
Konstruksi Nusantara tentang pekerjaan on power plant construction work in the area
pembangunan PLTU di daerah Tembilahan dan Tembilahan and Rengat, both located in the
Rengat, keduanya terletak di Propinsi Riau dengan province of Riau with contract Tembilahan
nilai kontrak untuk tembilahan sebesar amounting to Rp 56,634,559 and Rengat
Rp 56.634.559 dan untuk Rengat sebesar amounting to Rp 53,440,494. Period of work
Rp 53.440.494. Jangka waktu pekerjaan dimulai started since 27 November 2012 until the signing
sejak 27 November 2012 sampai dengan of the Minutes of Settlement Works (Note 37a
Penandatanganan Berita Acara Penyelesaian point (v) and (vi)).
Pekerjaan (Catatan 37a poin (v) dan (vi)).
c. Proyek PLTU Tembilahan, Riau c. Project of PLTU Tembilahan, Riau
Pada bulan Desember 2003, Perusahaan memiliki In December 2003, the Company entered into
beberapa perjanjian dengan PT Armata Bumi Asri, an agreement with PT Armata Bumi Asri, PT Buana
PT Buana Pratama, PT Energi Abadi, PT Fajar Timur Pratama, PT Energi Abadi, PT Fajar Timur Abadi,
Abadi, PT Kreasi Mandiri Sejahtera, PT Melamolita, PT Kreasi Mandiri Sejahtera, PT Melamolita,
PT Nuansa Bayu Abadi dan PT Satria Mandiri PT Nuansa Bayu Abadi and PT Satria Mandiri
(pelaksana), sehubungan dengan pelaksanaan (implementer), in relation to the implementation of
pembangunan PLTU dan sarananya di daerah PLTU construction in area Tembilahan, Riau with a
Tembilahan, Riau dengan nilai kontrak seluruhnya total contract value of Rp 121,287,765. This project
sebesar Rp 121.287.765. Proyek ini telah dihentikan has been discontinued in relation to the termination
sebagai reaksi terhadap perjanjian pengakhiran agreement with PLN (Note 37a).
dengan PLN (Catatan 37a).
d. Proyek PLTU Rengat, Riau d. Project of PLTU Rengat, Riau
Pada bulan Desember 2003, Perusahaan memiliki In December 2003, the Company entered into an
beberapa perjanjian dengan PT Catur Asri Persada, agreement with PT Catur Asri Persada, PT Citrajaya
PT Citra Jaya Abadi, PT Jaya Abadi, PT Narajaya Abadi, PT Jaya Abadi, PT Narajaya Primerindo,
Primerindo, PT Pana Utama, PT Ramada Aria dan PT Pana Utama, PT Ramada Aria and PT Restin
PT Restin (pelaksana) sehubungan dengan (implementer) in relation to the implementation of
pelaksanaan pembangunan PLTU dan prasarananya di PLTU construction and infrastructure in Rengat,
daerah Rengat, Riau, Kalimantan Selatan dengan nilai Riau, Central Kalimantan with a total contract
kontrak seluruhnya sebesar Rp 63.661.218. Proyek ini value of Rp 63,661,218. This project has been
telah dihentikan sebagai reaksi terhadap perjanjian discontinued in relation to the termination
pengakhiran dengan PLN (Catatan 37a). agreement with PLN (Note 37a).
Page 69
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/66 Exhibit E/66
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
37. PERJANJIAN DAN KOMITMEN PENTING (Lanjutan) 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
(Continued)
e. Pada tanggal 28 Juni 2019, telah ditandatangani e. On 28 June 2019, the Amendment and Restatement
Amendemen dan Pernyataan Kembali atas Perjanjian of the Coal Sale and Purchase Agreement (PJBB)
Jual Beli Batu Bara (PJBB) antara PT PLN (Persero) between PT PLN (Persero) and PT Exploitasi
dengan Konsorsium PT Exploitasi Energi Indonesia Energi Indonesia Tbk, CV Multi Bara Persada and
Tbk, CV Multi Bara Persada dan PT Borneo PT Borneo Indobara Consortium called Suppliers,
Indobara yang disebut dengan Pemasok, dengan with No. PLN 0043.Amd/EPI.02.02/DIRUT/2019 and
No. PLN: 0043.Amd/EPI.02.02/DIRUT/2019 dan No. Suppliers: 02/AMd.PK/PJBBEEI-PLN/VI/2019.
No. Pemasok: 02/AMd.PK/PJBBEEI-PLN/VI/2019.
Perjanjian ini menyatukan seluruh Perjanjian This agreement unites the entire Coal Sale and
Jual Beli Batu Bara (PJBB) No. 006.PJ/041/DIR/2011, Purchase Agreement (PJBB) No. 006.PJ/041/
tanggal 20 Januari 2011, PJBB No. 007.PJ/041/ DIR/2011 dated 20 January 2011, PJBB No. 007.PJ/
DIR/2011, tanggal 20 Januari 2011, PJBB 041/DIR/2011 dated 20 January 2011, PJBB
No. 129.PJ/041/DIR/2011, tanggal 14 Maret 2011, No. 129.PJ/041/DIR/2011, dated 14 March 2011,
PJBB No. 130.PJ/041/DIR/2011, tanggal 16 Maret PJBB No. 130.PJ/041/DIR/2011, dated 16 March
2011, PJBB No. 161.PJ/041/DIR/2011, tanggal 4 Mei 2011, PJBB No. 161.PJ/041/DIR/2011, dated 4 May
2011. Kuantitas batu bara yang telah disepakati 2011. The agreed quantity of coal to be sold and
untuk dijual dan diserahkan Perusahaan kepada PLN deliveres by the Company to PLN during PJBB period
selama jangka waktu PJBB yaitu sebesar 1.179.104 amounted 1,179,104 MT (+/- 30)/year.
MT (+/- 30%)/tahun.
Pada tanggal 25 November 2019, telah On 25 November 2019, the first Amendment to the
ditandatangani Amendemen I (pertama) atas Amendment and Restatement of the Coal Sale and
Amendemen dan Pernyataan Kembali Perjanjian Purchase Agreement (PJBB) between PT PLN
Jual Beli Batu Bara (PJBB) antara PT PLN (Persero) (Persero) and the Consortium of PT Exploitasi Energi
dengan Konsorsium PT Exploitasi Energi Indonesia Indonesia Tbk, CV Multi Bara Persada and PT Borneo
Tbk, CV Multi Bara Persada dan PT Borneo Indobara Indobara No. PLN: 0043.Amd/EPI.02.02/DIRUT/2019
No. PLN: 0043.Amd/EPI.02.02/DIRUT/2019 dan and No. Suppliers: 02/AMd.PK/PJBBEEI-PLN/VI/
No. Pemasok: 02/AMd.PK/PJBBEEI-PLN/VI/2019 2019, with No. PLN: 0123.AMD/EPI.02.02/010000/
dengan No. PLN: 0123.AMD/EPI.02.02/010000/2019 2019 and No. Supplier: 01/AMD.I-PLN/DIR/EEI/
dan No. Pemasok: 01/AMD.I-PLN/DIR/EEI/XI/2019, XI/2019, where Amendment I changes the Price,
di mana Amendemen I mengubah tentang Harga, Transportation Costs, Adjustment price of the FOB
Biaya Transportasi, Penyesuaian harga FOB Tongkang Barge and the price of the Coal bill, and changes
dan harga tagihan Batu Bara, dan mengubah Appendix I to the typical specifications of the
Lampiran I tentang spesifikasi tipikal Batu Bara Supplier Coal.
Pemasok.
Berdasarkan Akta Perjanjian Konsorsium No. 244, Based on the Deed of Consortium Agreement
tanggal 27 Desember 2021, dari Notaris Hannywati No. 244, dated 27 December 2021, from Hannywati
Gunawan, S.H., Notaris di Jakarta, PT Exploitasi Gunawan, S.H., Notary in Jakarta, PT Exploitasi
Energi Indonesia Tbk dan PT Borneo Indobara Energi Indonesia Tbk and PT Borneo Indobara agreed
sepakat untuk membentuk konsorsium, di mana PT to form a consortium, which PT Exploitas Energi
Exploitasi Energi Indonesia, Tbk sebagai team leader Indonesia, Tbk as the team leader of the consortium
konsorsium dan PT Borneo Indobara sebagai anggota and PT Borneo Indobara as a member of the
konsorsium. Konsorsium akan memasok batu bara ke consortium. The consortium will supply coal to PT
PT PLN (Persero) sesuai dengan PJBB. Jangka waktu PLN (Persero) according to PJBB. The term of the
konsorsium dimulai sejak penandatanganan consortium starts from the signing of this
perjanjian ini dan berlangsung untuk jangka waktu agreement and lasts for a period in accordance with
sesuai dengan berlakunya Perjanjian Jual Beli Batu the validity of the Coal Sale and Purchase
bara (PJBB) dengan PT PLN Persero dan dapat Agreement (PJBB) with PT PLN Persero and can be
diperpanjang apabila PJBB tersebut dilanjutkan. extended if the PJBB is continued.
Berdasarkan Akta Perjanjian Konsorsium No. 245, Based on the Deed of Consortium Agreement No.
tanggal 27 Desember 2021, dari Notaris Hannywati 245, dated 27 December 2021, from Hannywati
Gunawan, S.H., Notaris di Jakarta, menerangkan Gunawan, S.H., Notary in Jakarta, explain
tentang pengunduran diri CV Multi Bara Persada resignation of CV Multi Bara Persada as of the
sebagai anggota konsorsium, sehingga peserta consortium participants, so that the consortium
konsorsium berubah menjadi PT Exploitasi Energi participants turn into PT Exploitasi Energi Indonesia
Indonesia Tbk sebagai team leader konsorsium dan Tbk as the team leader of the consortium and
PT Borneo Indobara sebagai anggota konsorsium. PT Borneo Indobara as a member of the consortium.
Page 70
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/67 Exhibit E/67
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
37. PERJANJIAN DAN KOMITMEN PENTING (Lanjutan) 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
(Continued)
Pada tanggal 8 April 2022, telah ditandatangani On 8 April 2022, the Coal Sale and Purchase
Perjanjian Jual Beli Batu Bara (PJBB) (CIF) antara Agreement (PJBB) (CIF) has signed between PT PLN
PT PLN (Persero) dengan Konsorsium PT Exploitasi (Persero) and PT Exploitasi Energi Indonesia Tbk and
Energi Indonesia Tbk dan PT Borneo Indobara yang PT Borneo Indobara Consortium called Suppliers,
disebut dengan Pemasok, dengan Nomor PLN: 0200- with PLN No: 0200-3.Pj/EPI.01.01/C01050000/2022
3.Pj/EPI.01.01/C01050000/2022 dan No. Pemasok: and No. Suppliers: 01.01/PJBB-PLN/DIR/EEI/IV/
01.01/PJBB-PLN/DIR/EEI/IV/2022. PT PLN (Persero) 2022. PT PLN (Persero) agreed to buy and accept
sepakat untuk membeli dan menerima penyerahan delivery of Coal from the Supplier and pay to the
batu bara dari Pemasok dan membayar kepada Supplier and the Supplier agreed to sell and deliver
Pemasok dan Pemasok sepakat untuk menjual dan coal through the Cost, Insurance and Freight (CIF)
menyerahkan batu bara melalui skema Cost, scheme with the specifications, quality, and
Insurance dan Freight (CIF) dengan spesifikasi, quantity of Coal in accordance with the provisions
kualitas, dan kuantitas batu bara sesuai dengan in the PJBB. This PJBB is effective from the date of
kententuan dalam PJBB. PJBB ini berlaku sejak the first delivery and the Implementation
tanggal pengiriman pertama dan Jaminan Guarantee has been received by PLN Persero and
Pelaksanaan telah diterima oleh PLN Persero dan remains valid for 5 (five) years from the date of the
tetap berlaku sampai dengan 5 (lima) tahun sejak first delivery or until the Contract Quantity based
tanggal pengiriman pertama atau sampai dengan on this PJBB has been fulfilled, whichever event
Kuantias Kontrak berdasarkan PJBB ini telah occurs most recently (end date).
terpenuhi, peristiwa mana yang paling akhir terjadi
(tanggal berakhir).
Kuantitas batu bara yang telah disepakati untuk The agreed quantity of coal to be sold and deliveres
dijual dan diserahkan Perusahaan kepada PLN by the Company to PLN during PJBB period
selama jangka waktu PJBB yaitu sebesar 2.000.000 amounted 2,000,000 MT (+/- 20) per year.
MT (+/- 20%) per tahun.
Berdasarkan surat pemberitahuan tambahan terkait Based on the additional notification letter
dengan pembentukan holding dan sub-holding regarding the formation of PT PLN (Persero)
PT PLN (Persero) No. 0254/EPI.01.01/PLNEPI0100/ holding and sub-holding No. 0254/EPI.01.01/
2023 tanggal 16 Januari 2023, bahwa pembentukan PLNEPI0100/2023 dated 16 January 2023, that the
holding dan sub-holding berlaku efektif pada tanggal formation of holding and sub-holding will be
1 Januari 2023. Pihak yang dituju dalam dokumen effective on 1 January 2023. The parties addressed
tagihan lengkap adalah PT PLN (Persero), PT PLN in the complete billing document are PT PLN
Nusantara Power (PNP), dan PT PLN Indonesia Power (Persero), PT PLN Nusantara Power (PNP), and
(PIP). PT PLN Indonesia Power (PIP).
Pada tanggal 29 Agustus 2024, telah ditandatangani On 29 August 2024, the first Amendment of the
Amendemen I (pertama) atas Perjanjian Jual Beli Coal Sale and Purchase Agreement (PJBB) between
Batu Bara (PJBB) antara PT PLN (Persero) dan/atau PT PLN (Persero) and/or PT PLN Nusantara Power
PT PLN Nusantara Power dan/atau PT PLN Indonesia and/or PT PLN Indonesia Power and the Consortium
Power dengan Konsorsium PT Exploitasi Energi of PT Exploitasi Energi Indonesia Tbk and PT Borneo
Indonesia Tbk dan PT Borneo Indobara dengan Nomor Indobara with PLN No: 0200-3.Pj/EPI.01.01/
PLN: 0200-3.Pj/EPI.01.01/C01050000/2022 dan C01050000/2022 and No. Suppliers: 01.01/PJBB-
No. Pemasok: 01.01/PJBB-PLN/DIR/EEI/IV/2022, di PLN/DIR/EEI/IV/2022, where Amendment I changes
mana Amendemen I mengubah tentang para pihak the parties in PJBB, barge transportation prices,
dalam PJBB, harga transportasi tongkang, adds provisions regarding payment, performance
menambah ketentuan tentang pembayaran, jaminan bond for additional coal quantities beyond the
pelaksanaan atas penambahan kuantitas batu bara di agreed quantity, transfer, notification and NPWP
luar kuantitas yang telah diisepakati, pengalihan, list.
pemberitahuan, dan daftar NPWP.
Pada tanggal 2 Januari 2026, telah ditandatangani On 2 January 2026, the second Amendment of the
Amendemen II (kedua) atas Perjanjian Jual Beli Batu Coal Sale and Purchase Agreement (PJBB) between
Bara (PJBB) antara PT PLN (Persero) dan/atau PT PT PLN (Persero) and/or PT PLN Nusantara Power
PLN Nusantara Power dan/atau PT PLN Indonesia and/or PT PLN Indonesia Power and the Consortium
Power dengan Konsorsium PT Exploitasi Energi of PT Exploitasi Energi Indonesia Tbk and PT Borneo
Indonesia Tbk dan PT Borneo Indobara dengan Nomor Indobara with PLN No:
PLN: 0003.Amd/EPI.01.01/PLNEPI0100/2026 dan No. 0003.Amd/EPI.01.01/PLNEPI0100/2026 and No.
Pemasok: 01.02/PLN-AMD.II/DIR/EEI/I/2026, di Suppliers: 01.02/PLN-AMD.II/DIR/EEI/I/2026,
mana Amendemen II mengubah tentang harga where Amendment II changes coal prices,
batubara, penyesuaian harga FOB tongkang/vessel adjustments to FOB barge/vessel prices and coal
dan harga tagihan batubara, pembayaran dan invoice prices, payments and the addition of
penambahan klausal tentang pernyataan dan clauses on representations and warranties, and
jaminan, mengubah lampiran I PJBB tentang changes to Attachment I of the PJBB concerning
spesifikasi tipikal batubara pemasok. Amandemen II typical specifications for supplier coal. Amendment
ini berlaku efektif sejak ditandatangani. II is effective from the date of signing.
Page 71
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/68 Exhibit E/68
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
37. PERJANJIAN DAN KOMITMEN PENTING (Lanjutan) 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
(Continued)
Pada tanggal 21 April 2026, telah ditandatangani On 21 April 2026, the third Amendment of the Coal
Amendemen III (ketiga) atas Perjanjian Jual Beli Sale and Purchase Agreement (PJBB) between PT
Batu Bara (PJBB) antara PT PLN (Persero) dan/atau PLN (Persero) and/or PT PLN Nusantara Power
PT PLN Nusantara Power dan/atau PT PLN Indonesia and/or PT PLN Indonesia Power and the Consortium
Power dengan Konsorsium PT Exploitasi Energi of PT Exploitasi Energi Indonesia Tbk and PT Borneo
Indonesia Tbk dan PT Borneo Indobara dengan Indobara with PLN No: 0681.Amd/EPI.01.
Nomor PLN: 0681.Amd/EPI.01.01/PLNEPI0100/2026 01/PLNEPI0100/2026 and No. Suppliers: 01.21/PLN-
dan No. Pemasok: 01.21/PLN-AMD.III/DIR/EEI AMD.III/DIR/EEI/IV/2026, where Amendment III
/IV/2026, di mana Amendemen III mengubah amends the base transportation price. Amendment
tentang harga dasar transportasi. Amandemen III ini III is effective from the date of signing.
berlaku efektif sejak ditandatangani.
f. PT Berau Coal Energy f. PT Berau Coal Energy
Berdasarkan perjanjian tanggal 17 Mei 2017 antara Based on the agreement dated 17 May 2017 between
Perusahaan dengan PT Berau Coal Energy mengenai the Company and PT Berau Coal Energy regarding
pemberian uang jaminan sebesar Rp 93.282.000. the security deposit amounting to Rp 93,282,000,
PT Berau Coal Energy dan Perusahaan sepakat untuk PT Berau Coal Energy and the Company agreed to
melakukan kerja sama di mana Perusahaan akan cooperate in which the Company will establish and
mendirikan dan mengoperasikan power plant atau operate a powerplant or PLTU and PT Berau Coal
pembangkit tenaga listrik tenaga uap (“PLTU”) dan Energy will purchase the output of the power plant.
PT Berau Coal Energy akan membeli output dari The term of this agreement is from the date of
PLTU tersebut berupa tenaga listrik. Jangka waktu signing of this agreement until the security deposit
perjanjian adalah sejak ditandatanganinya is returned entirely by the Company (Note 20).
perjanjian ini sampai dengan uang jaminan
dikembalikan seluruhnya oleh Perusahaan
(Catatan 20).
g. Perjanjian-perjanjian Jual Beli Batu Bara dengan g. Coal Purchases Agreement with PT Sinergi Laksana
PT Sinergi Laksana Bara Mas (SLBM) dan PT Dwi Guna Bara Mas (SLBM) and PT Dwi Guna Laksana tbk
Laksana tbk (DGL): (DGL):
Berdasarkan Perjanjian Jual Beli Batu Bara (PJBB) Based on Coal Purchase Agreement Low Rank dated
Low Rank Coal (LRC) tanggal 30 Oktober 2019 30 October 2019 No. 03.30/SLBM/DIR/EEI/X/2019
No. 03.30/SLBM/DIR/EEI/X/2019 antara Perusahaan between the Company and SLBM, where SLBM will
dengan SLBM, di mana SLBM akan mensuplai batu supply coal for the PLTU Pangkalan Bun with a
bara untuk Pembangkit Listrik Tenaga Uap (PLTU) period of 5 (five) years. The price, volume of coal
Pangkalan Bun dengan jangka waktu 5 (lima) tahun. and the period of delivery are determined based on
Harga, volume batu bara dan jangka waktu Contract Discussion Agreement (CDA). On 6 January
penyerahan ditentukan berdasarkan Contract 2020, the Amendment-1 with agreement
Discussion Agremeent (CDA). Pada tanggal 6 Januari No. 02.06/SLBM/DIR/EEI/I/2020 has been signed.
2020, ditandatangani Amendemen-1 dengan Both parties agreed to change the coal price for the
perjanjian No. 02.06/SLBM/ DIR/EEI/I/2020. Kedua period of 1 January 2020 to 31 March 2020. As of
pihak sepakat untuk mengubah harga batu bara 1 April 2020, coal prices returned to prices in
periode 1 Januari 2020 sampai dengan 31 Maret accordance with agreement No. 03.30/SLBM/DIR/
2020. Per 1 April 2020, harga batu bara kembali EEI/X/2019.
kepada harga sesuai dengan perjanjian
No. 03.30/SLBM/DIR/EEI/X/2019.
Pada tanggal 10 Oktober 2024, ditandatangani On 10 October 2024, Amendment 2 has been signed
Amendemen 2 atas PJBB No. 03.30/SLBM/DIR/EEI/X/ on PJBB No. 03.30/SLBM/DIR/EEI/X/2019 between
2019 antara Perusahaan dengan SLBM, terkait the Company and SLBM, regarding changes to the
perubahan definisi dalam perjanjian dan volume definition in the agreement and the volume of coal
batu bara dan jangka waktu penyerahan ditentukan and delivery period are determined based on the
berdasarkan Contract Discussion Agremeent (CDA). Contract Discussion Agreement (CDA). This
Perjanjian ini berlaku efektif dari 30 Oktober 2024 agreement is effective from 30 October 2024 until
sampai dengan 29 Oktober 2029. 29 October 2029.
Pada tanggal 29 Oktober 2025, ditandatangani On 29 October 2025, Amendment 3 has been signed
Amendemen 3 atas PJBB No. 03.30/SLBM/DIR/EEI/X/ on PJBB No. 03.30/SLBM/DIR/EEI/X/2019 between
2019 antara Perusahaan, SLBM, dan DGL terkait the Company, SLBM, and DGL, regarding the change
perubahan pihak-pihak dalam perjanjian menjadi of parties in the agreement to the Company and
Perusahaan dan DGL. DGL.
Page 72
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/69 Exhibit E/69
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
37. PERJANJIAN DAN KOMITMEN PENTING (Lanjutan) 37. SIGNIFICANT AGREEMENTS AND COMMITMENTS
(Continued)
h. Perjanjian-perjanjian Jual Beli Batu Bara dengan h. Coal Purchases Agreement with PT Borneo
PT Borneo Indobara: Indobara:
Berdasarkan Perjanjian Jual Beli Batu Bara (PJBB)
Based on the coal trading contract No. BIB-
No. BIB-EEI/XII/23 tanggal 11 Desember 2023 antara
EEI/XII/23 dated 11 December 2023 between the
Perusahaan dan PT Borneo Indobara, Perusahaan
Company and PT Borneo Indobara, the Company
menyetujui membeli batu bara sebanyak 2.200.000
agreed to buy coal totalling 2,200,000 MT (full
MT (nilai penuh) (+/- 10%) pada harga yang
amount) (+/- 10%) at the agreed price per MT for
disepakati per MT untuk pengiriman dengan
barge and vessel shipment, the period of coal
tongkang dan vessel, jangka waktu pengiriman batu
shipment is from January-December 2024 until the
bara adalah dari bulan Januari-Desember 2024
quantity is reached where the point of sales are
hingga kuantitas batu bara tercapai dan lokasi
located at PLTU Indramayu, Rembang, Labuan
penerimaan batu bara tersebut berada di PLTU
Banten, Suralaya Baru, Tanjung Awar-awar, and
Indramayu, Rembang, Labuan Banten, Teluk Naga,
Adipala. This agreement is valid from 11 December
Suralaya Baru, Tanjung Awar-awar, dan Adipala.
2023 until the maturity date of 30 April 2025. This
Perjanjian ini berlaku dari 11 Desember 2023 sampai
agreement was extended until 30 April 2026 with
dengan jatuh tempo 30 April 2025. Perjanjian ini
agreement No. BIB-EEI/XII/24 dated 16 December
diperpanjang sampai dengan 30 April 2026 dengan
2024. This agreement was extended again until
perjanjian No. BIB-EEI/XII/24 tanggal 16 Desember
30 April 2027 with agreement No. BIB-EEI/XII/25
2024. Perjanjian ini diperpanjang kembali sampai
dated 16 December 2025.
dengan 30 April 2027 dengan perjanjian
No. BIB-EEI/XII/25 tanggal 16 Desember 2025.
i. Perjanjian Kerja Sama Pengelolaan Manajemen i. The Management Cooperation Agreement
No. 01.31/EEI/DIR/ESB/XII/2020, tanggal No. 01.31/EEI/DIR/ESB/XII/2020, dated
31 Desember 2020, antara Perusahaan dengan 31 December 2020 between the Company and
PT Energi Sinar Bara, di mana Perusahaan akan PT Energi Sinar Bara, where the Company will carry
melaksanakan kegiatan pengelolaan dan out operational and financial management and
pengawasan operasional serta keuangan supervision activities of the Company. For the
Perusahaan. Atas pelaksanaan pekerjaan tersebut, implementation of this work, the Company will
Perusahaan akan menagihkan komisi sebesar 2% dari charge a commission of 2% of the total revenue of
total pendapatan PT Energi Sinar Bara selama 1 PT Energi Sinar Bara for 1 (one) fiscal year prior to
(satu) tahun buku sebelum audit. Jangka waktu the audit.The agreement will start on 1 January
perjanjian mulai dari 1 Januari 2021 sampai dengan 2021 through 31 December 2021. This agreement
31 Desember 2021. Perjanjian ini diperpanjang was extended until 31 December 2024 with
sampai dengan 31 Desember 2024 dengan perjanjian agreement No. 04.02/ESB/DIR/EEI/I/2024 dated
No. 04.02/ESB/DIR/EEI/I/2024 tanggal 2 Januari 2 January 2024. This agreement was extended with
2024. Perjanjian ini diperpanjang dengan amendment 1 until 31 December 2025.
amandemen 1 sampai dengan 31 Desember 2025.
j. Perjanjian jasa pemasaran No. 02.31/EEI/DIR/ j. Marketing service agreement No. 02.31/EEI/DIR/
ESB/XII/2020 tanggal 31 Desember 2020, antara ESB/XII/2020 dated 31 December 2020 between the
Perusahaan dengan PT Energi Sinar Bara di mana Company and PT Energi Sinar Bara was made where
PT Exploitasi Energi Indonesia Tbk akan memberikan PT Exploitasi Energi Indonesia Tbk will provide
bantuan pengelolaan dan pelaksanaan proses-proses management and administrative assistance, for
administrasi, baik teknis maupun nonteknis, both technical and non-technical issues including
termasuk membantu penagihan, pembayaran serta helping with billing, payment as well as other
hal-hal lain yang terkait dengan seluruh kontrak jual things related to the sale and purchases of coals as
beli batu bara yang dibuat oleh dan antara a whole made between the Company and other
Perusahaan dengan pihak lain. Biaya atas parties. Fees regarding the marketing service
pelaksanaan jasa Pemasaran yang dilakukan agreement between PT Exploitasi Energi
PT Exploitasi Energi Indonesia Tbk sebesar Indonesia Tbk amounting to Rp 3,000 (full amount)
Rp 3.000 (nilai penuh) per ton sudah termasuk per ton with income tax article 23 and other taxes
PPh 23 dan pajak-pajak lainnya. Jangka waktu already included. The agreement will begin on
perjanjian mulai berlaku dari tanggal 1 Januari 2021 1 January 2021 through 31 December 2021.
sampai dengan 31 Desember 2021. Biaya jasa The marketing fee will be Rp 1,000 per ton
pemasaran menjadi Rp 1.000 per ton termasuk including tax article 23 and other taxes starting
PPh 23 dan pajak-pajak lainnya dimulai 1 Januari 1 January 2022. This agreement was extended from
2022. Perjanjian ini diperpanjang dari 1 Januari - 1 January – 31 December 2024 with agreement
31 Desember 2024 dengan No. 03.02/ESB/DIR/ No. 03.02/ESB/DIR/EEI/I/2024. This agreement
EEI/I/2024. Perjanjian ini diperpanjang dengan was extended with amendment 1 until 31 December
amandemen 1 sampai dengan 31 Desember 2025. 2025.
Page 73
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/70 Exhibit E/70
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
38. TUJUAN DAN KEBIJAKAN MANAJEMEN RISIKO KEUANGAN 38. FINANCIAL RISK MANAGEMENT OBJECTIVES AND
POLICIES
Dalam aktivitas usaha harian, Grup dihadapkan oleh In its daily business activities, the Group is exposed to
beberapa risiko. Risiko utama yang dihadapi oleh Grup risks. The main risks facing by Group arising from its
muncul dari instrumen keuangan Grup yang berhubungan financial instruments are market risk (including the
dengan risiko pasar (termasuk dampak risiko suku bunga, effects of interest rate risk, foreign exchange risk),
risiko mata uang asing), risiko kredit dan risiko likuiditas. credit risk, and liquidity risk.
Kebijakan akan pentingnya mengelola tingkat risiko ini The importance of the policies in managing this risk level
telah meningkat secara signifikan dengan has increased significantly by considering some
mempertimbangkan beberapa parameter perubahan dan parameters change and volatility of financial markets
volatilitas pasar keuangan baik di Indonesia maupun both in Indonesia and internationally. The Group’s
internasional. Direksi Grup menelaah dan menyetujui Directors reviews and approves risk policies covering the
kebijakan risiko yang mencakup toleransi risiko dalam risk tolerance in the strategy to manages the risk which
strategi mengelola risiko-risiko yang dirangkum di bawah are summarized below.
ini.
a. Risiko Kredit a. Credit Risk
Risiko kredit adalah risiko bahwa counterparty tidak Credit risk is the risk that a counterparty will not
akan memenuhi liabilitasnya berdasarkan instrumen meet its obligation under a financial instrument or
keuangan atau kontrak pelanggan, yang menyebabkan customer contract, leading to a financial loss. There
kerugian keuangan. Tidak ada risiko kredit yang is no significant concentration of credit risk. The
terpusat secara signifikan. Grup mengelola dan Group manages and controls credit risk by setting
mengendalikan risiko kredit dengan menetapkan limit of acceptable risk for individual customers and
batasan risiko yang dapat diterima untuk pelanggan monitors the exposure associated with these
individu dan memantau eksposur terkait dengan restrictions.
batasan-batasan tersebut.
Risiko kredit timbul dari sisa aset keuangan pada Credit risk arises from outstanding financial assets as
laporan akhir periode. Manajemen menempatkan kas of the end of the reporting period. Management
hanya pada bank yang bereputasi baik dan terpercaya. placed cash, only to reputable banks and minimizes
Untuk meminimalisasi risiko kredit atas piutang usaha credit risk on receivable from sale of coal, revenue
yang berasal dari penjualan batu bara, pendapatan from PLTU and others, management are having
PLTU dan lainnya, manajemen melakukan hubungan business relationship with customers who has the
usaha dengan pelanggan yang memiliki kredibilitas, credibility, establish verification policy and credit
menerapkan kebijakan verifikasi dan otorisasi kredit. authorization.
Maksimum risiko kredit yang dihadapi Grup kurang The maximum exposure of the credit risk
lebih sebesar nilai tercatat dari saldo akun piutang approximates the net carrying amounts of the
usaha pada tanggal 30 Juni 2026 dan 31 Desember outstanding financial assets as of 30 June 2026 and
2025. 31 December 2025.
Tabel berikut ini memberikan informasi mengenai The following table provides information regarding
maksimum kredit yang dihadapi oleh Grup pada the maximum credit risk exposure faced by the Group
30 Juni 2026 dan 31 Desember 2025: as of 30 June 2026 and 31 December 2025:
30 Juni 2026/ 31 Desember 2025/
30 June 2026 31 December 2025
Bank 338.242.549 253.967.829 Banks
Piutang usaha - pihak ketiga - neto 327.576.750 114.645.217 Trade receivables - third parties – net
Jumlah 665.819.299 368.613.046 Total
Page 74
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/71 Exhibit E/71
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
38. TUJUAN DAN KEBIJAKAN MANAJEMEN RISIKO KEUANGAN 38. FINANCIAL RISK MANAGEMENT OBJECTIVES AND
(Lanjutan) POLICIES (Continued)
a. Risiko Kredit (Lanjutan) a. Credit Risk (Continued)
Berikut merupakan tabel yang memberikan informasi The following table provides the credit quality and
mengenai kualitas kredit dan analisis umur dari aset age analysis of the Group’s financial assets according
keuangan Grup berdasarkan pada penilaian kredit to the Group’s credit ratings of debtors as of
debitor Grup pada 30 Juni 2026 dan 31 Desember 2025: 30 June 2026 and 31 December 2025:
30 Juni 2026/30 June 2026
Belum
jatuh tempo dan Telah jatuh tempo tetapi belum diturunkan nilainya/ Telah
tidak ada Past due but not yet impaired jatuh tempo dan
penurunan nilai/ diturunkan
Neither past Lebih dari nilainya/
due nor 1 - 30 hari/ 31 - 60 hari/ 61 - 90 hari/ 90 hari/ Past due and Jumlah/
impaired 1 - 30 days 31 - 60 days 61 - 90 days Over 90 days impaired Total
Bank 338.242.549 - - - - - 338.242.549 Cash in banks
Piutang Trade
usaha - receivables -
pihak ketiga 168.052.717 157.585.481 1.938.552 - - 594.528.585 922.105.335 third parties
Piutang lain-lain Other receivables
Pihak ketiga - - - - - 297.817.515 297.817.515 Third parties
Pihak berelasi - - - - - 62.213.343 62.213.343 Related parties
Uang muka Financial
keuangan - - - - - 384.865.444 384.865.444 advances
Jumlah 506.295.266 157.585.481 1.938.552 - - 1.339.424.887 2.005.244.186 Total
31 Desember 2025/31 December 2025
Belum
jatuh tempo dan Telah jatuh tempo tetapi belum diturunkan nilainya/ Telah
tidak ada Past due but not yet impaired jatuh tempo dan
penurunan nilai/ diturunkan
Neither past Lebih dari nilainya/
due nor 1 - 30 hari/ 31 - 60 hari/ 61 - 90 hari/ 90 hari/ Past due and Jumlah/
impaired 1 - 30 days 31 - 60 days 61 - 90 days Over 90 days impaired Total
Bank 253.967.829 - - - - - 253.967.829 Cash in banks
Piutang Trade
usaha - receivables -
pihak ketiga 82.239.038 30.205.171 2.201.008 - - 594.528.585 709.173.802 third parties
Piutang lain-lain Other receivables
Pihak ketiga - - - - - 309.636.180 309.636.180 Third parties
Pihak berelasi - - - - - 72.329.552 72.329.552 Related parties
Uang muka Financial
keuangan - - - - - 384.865.444 384.865.444 advances
Jumlah 336.206.867 30.205.171 2.201.008 - - 1.361.359.761 1.729.972.807 Total
Tabel berikut ini memberikan informasi tentang The following table provides information about the
paparan risiko kredit dan kerugian kredit ekspektasian exposure to credit risk and ECLs for trade receivables
untuk piutang usaha pada tanggal 30 Juni 2026 dan as at 30 June 2026 and 31 December 2025:
31 Desember 2025:
30 Juni 2026 / 30 June 2026
Rata-rata tingkat Provisi atas
kerugian/ penurunan nilai/
Probability of Jumlah tercatat/ Provision for
default Carrying amount impairment
Belum jatuh tempo - 168.052.717 - Current
Jatuh tempo: Due date:
< 30 hari - 157.585.481 - < 30 days
31 - 60 hari - 1.938.552 - 31 - 60 days
61 - 90 hari - - - 61 - 90 days
> 90 hari 100% 594.528.585 (594.528.585 ) > 90 days
922.105.335 (594.528.585 )
Page 75
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/72 Exhibit E/72
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
38. TUJUAN DAN KEBIJAKAN MANAJEMEN RISIKO KEUANGAN 38. FINANCIAL RISK MANAGEMENT OBJECTIVES AND
(Lanjutan) POLICIES (Continued)
a. Risiko Kredit (Lanjutan) a. Credit Risk (Continued)
Tabel berikut ini memberikan informasi tentang The following table provides information about the
paparan risiko kredit dan kerugian kredit ekspektasian exposure to credit risk and expected credit loss for
untuk piutang usaha pada tanggal 30 Juni 2026 dan trade receivables as at 30 June 2026 and
31 Desember 2025: (Lanjutan) 31 December 2025: (Continued)
31 Desember 2025 / 31 December 2025
Rata-rata tingkat Provisi atas
kerugian/ penurunan nilai/
Probability of Jumlah tercatat/ Provision for
default Carrying amount impairment
Belum jatuh tempo - 82.239.038 - Current
Jatuh tempo: Due date:
< 30 hari - 30.205.171 - < 30 days
31 - 60 hari - 2.201.008 - 31 - 60 days
61 - 90 hari - - - 61 - 90 days
> 90 hari 100% 594.528.585 (594.528.585 ) > 90 days
709.173.802 (594.528.585 )
Instrumen keuangan diklasifikasikan sebagai “belum Financial instruments classified under “neither past
jatuh tempo dan tidak ada penurunan nilai” meliputi due nor impaired” includes high grade credit quality
instrumen dengan kualitas kredit tinggi karena ada instruments because there was few or no history of
sedikit atau tidak ada pengalaman kegagalan (default) default on the agreed terms based on the letter of
pada kesepakatan berdasarkan surat kuasa, surat authorization, letter of guarantee or promissory
jaminan atau promissory note. “Telah jatuh tempo note. “Past due but not impaired” are items with
tetapi belum diturunkan nilainya” adalah akun-akun history of frequent default nevertheless the amount
dengan pengalaman kegagalan (default) yang sering due are still collectible. Lastly, “past due and
namun demikian total terutang masih tertagih. impaired” are those that are long outstanding and
Terakhir “telah jatuh tempo dan diturunkan nilainya” has been provided with allowance for impairment
adalah akun yang telah lama belum dilunasi dan telah loss on receivables.
dibentuk penyisihan kerugian penurunan nilai atas
piutang.
b. Risiko Pasar b. Market Risk
Risiko pasar adalah risiko di mana nilai wajar dari arus Market risk is the risk that the fair value of future
kas masa depan dari suatu instrumen keuangan akan cash flows of a financial instrument will fluctuate
berfluktuasi karena perubahan harga pasar. Grup because of changes in market prices. The Group is
dipengaruhi, terutama oleh risiko nilai tukar mata uang exposed to market risks, in particular, foreign
asing. currency exchange risk.
Risiko Suku Bunga Interest Rate Risk
Risiko tingkat suku bunga Grup timbul dari utang bank The Group’s interest rate risk arises from bank loan
dan liabilitas keuangan lainnya. Pada tanggal and other financial liabilities. As of 30 June 2026, the
30 Juni 2026, Grup hanya mempunyai utang bank Group only has bank loan and other financial
pinjaman dan liabilitas keuangan lainnya dengan suku liabilities with fixed interest rate. The Group does
bunga tetap. Grup tidak mempunyai pinjaman dengan not account for any fixed rate loans at fair value to
suku bunga tetap yang diukur dengan nilai wajar profit or loss. Therefore, a change in interest rate
melalui laba rugi. Oleh karena itu, perubahan tingkat risk at the reporting date would not affect
suku bunga pada tanggal pelaporan tidak akan consolidated statement of profit or loss and other
memengaruhi laporan laba rugi dan penghasilan comprehensive income.
komprehensif konsolidasian.
Page 76
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/73 Exhibit E/73
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
38. TUJUAN DAN KEBIJAKAN MANAJEMEN RISIKO KEUANGAN 38. FINANCIAL RISK MANAGEMENT OBJECTIVES AND
(Lanjutan) POLICIES (Continued)
b. Risiko Pasar (Lanjutan) b. Market Risk (Continued)
Risiko Mata Uang Asing Foreign Exchange Risk
Risiko mata uang asing adalah risiko di mana nilai wajar Foreign exchange risk is the risk that the fair value
atau arus kas masa mendatang dari suatu instrumen or future cash flows of a financial instrument will
keuangan karena perubahan dari nilai tukar mata uang fluctuate because of changes in foreign exchanges
asing. Grup terekspos risiko nilai tukar mata uang asing rates. The Group is exposed to foreign exchange risk
yang terutama timbul dari aset/liabilitas moneter neto arising from net monetary assets/liabilities that are
yang berbeda dengan mata uang fungsional Grup. not denominated in the Group’s functional currency.
Grup dalam melakukan kegiatan usahanya sebagian The Group conducts its business activities mostly
besar mempergunakan mata uang Rupiah dalam hal using Rupiah currency in terms of the sale
transaksi penjualan, pembelian bahan baku dan beban transaction, purchase of raw materials and operating
usaha. Transaksi usaha dalam mata uang asing hanya expenses. Business transactions in foreign currencies
dilakukan untuk hal-hal khusus dan jika hal tersebut only for specific things, and if it occurs, management
terjadi, manajemen akan melakukan reviu berkala atas will conduct periodic review on the foreign currency
eksposur mata uang asing tersebut. exposure.
c. Risiko Likuiditas c. Liquidity Risk
Risiko likuiditas adalah risiko kerugian yang timbul Liquidity risk is a risk arising when the cash flows
karena Grup tidak memiliki arus kas yang cukup untuk position of the Group is not enough to cover the
memenuhi liabilitasnya. liabilities which become due.
Dalam mengelola risiko likuiditas, Grup memantau dan In managing liquidity risk, the Group monitors and
menjaga tingkat kas dan bank yang dianggap memadai maintains level of cash on hand and in banks deemed
untuk membiayai operasional Grup untuk mengatasi adequate to finance the operations of the Group to
dampak dari arus kas. Grup juga secara rutin overcome the impact of fluctuations in cash flows.
mengevaluasi proyeksi arus kas dan arus kas aktual The Group also regularly evaluate cash flow
dan terus menelaah kondisi pasar keuangan untuk projections and actual cash flows and continue to
mengambil inisiatif penggalangan dana, antara lain examine the condition of financial markets to take a
pinjaman bank. fundraising intiative, which may include bank loans.
Tabel di bawah merupakan profil liabilitas keuangan The table below summarizes the maturity profile of
Grup berdasarkan kontrak pembayaran tanpa diskonto the Group’s financial liabilities based on contractual
pada tanggal 30 Juni 2026 dan 31 Desember 2025: undiscounted payments at 30 June 2026 and
31 December 2025:
30 Juni 2026 / 30 June 2026
Kurang Lebih
Dari 3 bulan dan 1 dan 2 dan dari
3 bulan/ 1 tahun/ 2 tahun/ 5 tahun/ 5 tahun/
Less than 3 months 1 and 2 and Over Jumlah/
3 months and 1 year 2 years 5 years 5 years Total
Utang usaha Trade payables
Pihak ketiga 956.814.859 - - - - 956.814.859 Third parties
Utang lain-lain Other payables
Pihak ketiga 232.616.304 - - - - 232.616.304 Third parties
Pihak berelasi 35.461.715 - - - - 35.461.715 Related party
Utang dividen 16.314.837 - - - - 16.314.837 Dividend payables
Biaya masih
harus dibayar 23.276.151 - - - - 23.276.151 Accrued expenses
Liabilitas pembiayaan Consumer financing
konsumen 75.101 25.337 - - - 100.438 liabilities
Liabilitas sewa 110.172 340.149 395.499 - - 845.820 Lease liabilites
Liabilitas keuangan Other financial
lainnya - liabilities -
pihak ketiga 56.102.247 577.037 700.034 201.205.301 - 258.584.619 third parties
Uang jaminan 93.282.000 179.160.000 107.500.000 - - 379.942.000 Security deposit
Utang bank 15.330.471 48.591.757 27.863.513 - - 91.785.741 Bank loans
Jumlah Liabilitas Total Financial
Keuangan 1.429.383.857 228.694.280 136.459.046 201.205.301 - 1.995.742.484 Liabilities
Page 77
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/74 Exhibit E/74
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
38. TUJUAN DAN KEBIJAKAN MANAJEMEN RISIKO KEUANGAN 38. FINANCIAL RISK MANAGEMENT OBJECTIVES AND
(Lanjutan) POLICIES (Continued)
c. Risiko Likuiditas (Lanjutan) c. Liquidity Risk (Continued)
Tabel di bawah merupakan profil liabilitas keuangan The table below summarizes the maturity profile of
Grup berdasarkan kontrak pembayaran tanpa diskonto the Group’s financial liabilities based on contractual
pada tanggal 30 Juni 2026 dan 31 Desember 2025: undiscounted payments at 30 June 2026 and
(Lanjutan) 31 December 2025: (Continued)
31 Desember 2025 / 31 December 2025
Kurang Lebih
Dari 3 bulan dan 1 dan 2 dan dari
3 bulan/ 1 tahun/ 2 tahun/ 5 tahun/ 5 tahun/
Less than 3 months 1 and 2 and Over Jumlah/
3 months and 1 year 2 years 5 years 5 years Total
Utang usaha Trade payables
Pihak ketiga 777.019.005 - - - - 777.019.005 Third parties
Utang lain-lain Other payables
Pihak ketiga 241.989.190 - - - - 241.989.190 Third parties
Pihak berelasi 35.761.715 - - - - 35.761.715 Related party
Utang dividen 16.314.837 - - - - 16.314.837 Dividend payables
Biaya masih
harus dibayar 24.226.838 - - - - 24.226.838 Accrued expenses
Liabilitas pembiayaan Consumer financing
konsumen 72.435 174.195 - - - 246.630 liabilities
Liabilitas sewa 93.924 332.121 586.275 - - 1.012.320 Lease liabilites
Liabilitas keuangan Other financial
lainnya - liabilities -
pihak ketiga 56.247.638 385.736 729.363 201.646.106 - 259.008.843 third parties
Uang jaminan 93.282.000 204.160.000 120.000.000 - - 417.442.000 Security deposit
Utang bank 14.759.086 46.654.868 61.129.657 - - 122.543.611 Bank loans
Jumlah Liabilitas Total Financial
Keuangan 1.259.766.668 251.706.920 182.445.295 201.646.106 - 1.895.564.989 Liabilities
39. PENJUALAN INVESTASI PADA ENTITAS ANAK 39. SALE OF INVESTMENT IN SUBSIDIARY
Pada tanggal 29 April 2026, EBI (entitas anak) melepas On 29 April 2026, EBI (a subsidiary) disposed all of its
seluruh kepemilikan sahamnya sebesar 99,88% atas shares of 99.88% in PT Sekti Rahayu Indah (PT SRI) to
PT Sekti Rahayu Indah (PT SRI) kepada PT Mitra Barito dan PT Mitra Barito dan PT Banua Antang Raya, third parties.
PT Banua Antang Raya, pihak ketiga.
Pada tanggal penjualan, analisa aset dan liabilitas atas As of the date of sale, the analysis of assets and liabilities
hilangnya pengendalian adalah sebagai berikut: over which control was lost is as follows:
30 Juni 2026/
30 June 2026
Jumlah aset 5.791 Total assets
Jumlah liabilitas 12.030.184 Total liabilities
Liabilitas neto 12.024.393 Net liabilities
Keuntungan penjualan entitas anak adalah sebagai Gain on sale of subsidiaries is as follows:
berikut:
30 Juni 2026/
30 June 2026
Imbalan yang diterima 50.000.000 Consideration received
Liabilitas neto yang dijual 12.024.393 Net liabilities disposed
Keuntungan penjualan entitas anak 62.024.393 Gain on sale of subsidiaries
Dampak penjualan kepemilikan saham PT SRI tersebut, As a result of sale of ownership of PT SRI, Company did not
Perusahaan sudah tidak melakukan konsolidasi atas consolidate the results PT SRI’s operations after 29 April
kegiatan operasi PT SRI sejak 29 April 2026 dan laporan 2026 and PT SRI’s financial statements is no longer
keuangan PT SRI tidak dikonsolidasi sejak tanggal tersebut. consolidated effective on that date.
Page 78
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/75 Exhibit E/75
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
40. INFORMASI TAMBAHAN UNTUK LAPORAN ARUS KAS 40. SUPPLEMENTARY INFORMATION FOR CASH FLOWS
Transaksi nonkas dari aktivitas pendanaan ditunjukkan Non-cash transactions from financing activities are
dalam rekonsiliasi liabilitas dari transaksi pendanaan di shown in the reconciliation of liabilities from financing
bawah ini. transactions below.
30 Juni 2026 / 30 June 2026
Transaksi Saldo
Saldo awal/ nonkas/ akhir/
Beginning Penerimaan/ Pembayaran/ Non-cash Ending
balance Receipt Payment transaction balance
Liabilitas pembiayaan konsumen/
Consumer financing liabilities 246.630 - (146.192) - 100.438
Utang bank - jangka panjang/
Long-term bank loans 122.543.611 - (30.426.883) (330.987) 91.785.741
Liabilitas keuangan lainnya/
Other financial liabilities 259.008.843 - (424.224) - 258.584.619
Jumlah/Total 381.799.084 - (30.997.299) (330.987) 350.470.798
31 Desember 2025 / 31 December 2025
Transaksi Saldo
Saldo awal/ nonkas/ akhir/
Beginning Penerimaan/ Pembayaran/ Non-cash Ending
balance Receipt Payment transaction balance
Liabilitas pembiayaan konsumen/
Consumer financing liabilities 523.629 - (276.999) - 246.630
Utang bank - jangka panjang/
Long-term bank loans 175.851.535 - (54.961.052) 1.653.128 122.543.611
Liabilitas keuangan lainnya/
Other financial liabilities 286.957.459 - (27.948.616) - 259.008.843
Jumlah/Total 463.332.623 - (83.186.667) 1.653.128 381.799.084
41. NILAI WAJAR INSTRUMEN KEUANGAN 41. FAIR VALUE OF FINANCIAL INSTRUMENTS
Tabel di bawah ini adalah nilai tercatat dan nilai wajar atas The table below sets out the carrying values and fair
instrumen keuangan dalam laporan posisi keuangan values of financial instruments in consolidated
konsolidasian pada tanggal 30 Juni 2026 dan 31 Desember statement of financial position as of 30 June 2026 and 31
2025: December 2025 as follows:
30 Juni 2026 / 30 June 2026
Nilai tercatat/ Nilai wajar/
Carrying value Fair value
Aset keuangan Financial assets
Aset keuangan yang dicatat Financial asset measured at
berdasarkan biaya perolehan amortized cost
Kas dan bank 338.305.904 338.305.904 Cash on hand and in banks
Piutang usaha - pihak ketiga 327.576.750 327.576.750 Trade receivables - third parties
Jumlah 665.882.654 665.882.654 Total
Page 79
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/76 Exhibit E/76
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
41. NILAI WAJAR INSTRUMEN KEUANGAN (Lanjutan) 41. FAIR VALUE OF FINANCIAL INSTRUMENTS (Continued)
Tabel di bawah ini adalah nilai tercatat dan nilai wajar atas The table below sets out the carrying values and fair
instrumen keuangan dalam laporan posisi keuangan values of financial instruments in consolidated
konsolidasian pada tanggal 30 Juni 2026 dan 31 Desember statement of financial position as of 30 June 2026 and 31
2025: (Lanjutan) December 2025 as follows: (Continued)
30 Juni 2026 / 30 June 2026
Nilai tercatat/ Nilai wajar/
Carrying value Fair value
Liabilitas keuangan Financial liabilities
Liabilitas keuangan yang dicatat
berdasarkan biaya perolehan Financial liabilities measured
diamortisasi at amortized cost
Utang usaha Trade payables
Pihak ketiga 956.814.859 956.814.859 Third parties
Utang lain-lain Other payables
Pihak ketiga 232.616.304 232.616.304 Third parties
Pihak berelasi 35.461.715 35.461.715 Related party
Utang dividen 16.314.837 16.314.837 Dividend payables
Biaya masih harus dibayar 23.276.151 23.276.151 Accrued expenses
Liabilitas pembiayaan konsumen 100.438 100.438 Consumer financing liabilities
Liabilitas sewa 845.820 845.820 Lease liabilites
Liabilitas keuangan lainnya Other financial liabilities
Pihak ketiga 258.584.619 258.584.619 Third parties
Uang jaminan 379.942.000 379.942.000 Security deposits
Utang bank 91.785.741 77.018.937 Bank loans
Jumlah 1.995.742.484 1.980.975.680 Total
31 Desember 2025 / 31 December 2025
Nilai tercatat/ Nilai wajar/
Carrying value Fair value
Aset keuangan Financial assets
Aset keuangan yang dicatat Financial asset measured at
berdasarkan biaya perolehan amortized cost
Kas dan bank 254.031.368 254.031.368 Cash on hand and in banks
Piutang usaha - pihak ketiga 114.645.217 114.645.217 Trade receivables - third parties
Jumlah 368.676.585 368.676.585 Total
Liabilitas keuangan Financial liabilities
Liabilitas keuangan yang dicatat
berdasarkan biaya perolehan Financial liabilities measured
diamortisasi at amortized cost
Utang usaha Trade payables
Pihak ketiga 777.019.005 777.019.005 Third parties
Utang lain-lain Other payables
Pihak ketiga 241.989.190 241.989.190 Third parties
Pihak berelasi 35.761.715 35.761.715 Related party
Utang dividen 16.314.837 16.314.837 Dividend payables
Biaya masih harus dibayar 24.226.838 24.226.838 Accrued expenses
Liabilitas pembiayaan konsumen 246.630 246.630 Consumer financing liabilities
Liabilitas sewa 1.012.320 1.012.320 Lease liabilites
Liabilitas keuangan lainnya Other financial liabilities
Pihak ketiga 259.008.843 259.008.843 Third parties
Uang jaminan 417.442.000 417.442.000 Security deposits
Utang bank 122.543.611 107.156.463 Bank loans
Jumlah 1.895.564.989 1.880.177.841 Total
Page 80
These Consolidated Financial Statements were Originally Issued
in Indonesian Language
Ekshibit E/77 Exhibit E/77
PT EXPLOITASI ENERGI INDONESIA Tbk DAN ENTITAS ANAK PT EXPLOITASI ENERGI INDONESIA Tbk AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN INTERIM NOTES TO THE INTERIM CONSOLIDATED FINANCIAL
UNTUK PERIODE ENAM BULAN YANG BERAKHIR STATEMENTS FOR THE SIX-MONTH PERIOD ENDED
30 JUNI 2026 (TIDAK DIAUDIT) 30 JUNE 2026 (UNAUDITED)
(Disajikan dalam Ribuan Rupiah, kecuali dinyatakan lain) (Expressed in Thousands of Rupiah, unless otherwise stated)
41. NILAI WAJAR INSTRUMEN KEUANGAN (Lanjutan) 41. FAIR VALUE OF FINANCIAL INSTRUMENTS (Continued)
Berikut metode dan asumsi yang digunakan untuk estimasi The following methods and assumptions are used to
nilai wajar: estimate the fair value:
Nilai wajar dari kas dan bank, piutang usaha, piutang lain- The fair value of cash on hand and in banks, trade
lain, uang muka keuangan, utang usaha, utang lain-lain, receivables, other receivables, financial advances, trade
utang dividen, biaya masih harus dibayar, utang bank, payables, other payables, dividends payable, accrued
liabiltias pembiayaan konsumen, liabilitas sewa, liabilitas expenses, bank loan, consumer financing liabilities, other
keuangan lain-lain dan uang jaminan mendekati nilai financial liabilities and security deposits approximate the
tercatatnya karena jangka waktu jatuh tempo instrumen carrying amount due to the short-term maturity period of
keuangan tersebut yang berjangka waktu pendek. these financial instruments.
42. KELANGSUNGAN USAHA 42. GOING CONCERN
Laporan keuangan konsolidasian telah disusun dengan The consolidated financial statements have been
asumsi bahwa Grup akan melanjutkan usahanya secara prepared assuming that the Group will continue as a
berkelanjutan. Grup mengalami defisiensi modal sebesar going concern. The Group incurred capital deficiency of
Rp 941.483.202 pada tanggal 30 Juni 2026 dan Rp 941,483,202 as of 30 June 2026 and total
liabilitas jangka pendek melebihi aset lancar sebesar current liabilities exceeded its total current assets of
Rp 722.696.492 pada tanggal tersebut. Kondisi tersebut, Rp 722,696,492 on such date. These conditions may cast
mungkin dapat menyebabkan keraguan signifikan atas significant doubt on the Group's ability to continue as a
kemampuan Grup untuk mempertahankan kelangsungan going concern.
usahanya.
Untuk kelangsungan usaha (going concern) Grup dan For the Group’s going concern and the ability of the
kemampuan Grup menjalankan kegiatan operasinya secara Group to carry out its operational activities adequately,
memadai maka manajemen Grup merencanakan hal-hal the Group’s management plan are as follows:
sebagai berikut:
- Mengoptimalkan pengiriman batu bara kepada PT PLN - Optimize the delivery of coal to PT PLN (Persero) on
(Persero) atas kontrak jangka menengah selama a 5 year mid-term contract owned by the Group.
5 tahun yang telah dimiliki oleh Grup.
- Menjajaki pemasok batu bara yang sesuai dengan - Explore coal suppliers that meet PT PLN (Persero)
kebutuhan PT PLN (Persero) selain pemasok yang sudah needs in addition to existing suppliers to minimize
ada saat ini untuk meminimalisasi risiko ketersediaan the risks of coal supply.
pasokan batu bara.
- Berupaya meningkatkan kinerja PLTU Pangkalan Bun. - To improve performance of PLTU Pangkalan Bun.
43. OTORISASI LAPORAN KEUANGAN KONSOLIDASIAN 43. AUTHORIZATION OF CONSOLIDATED FINANCIAL
STATEMENTS
Direksi bertanggung jawab terhadap penyusunan dan The Board of Directors is responsible for the preparation
penyajian laporan keuangan konsolidasian yang telah and presentation of the consolidated financial
diselesaikan dan disetujui untuk diterbitkan pada tanggal statements that were completed and approved for
29 Juli 2026. publication on 29 July 2026.
Names mentioned 129 people and organisations named in the text · linked when the evidence is strong
unresolved
person
Mulyoto
p.10 ×2
unresolved
org
Minister of Justice
p.10
unresolved
person
Dahlia
p.10 ×4
unresolved
org
Menteri Hukum Republik Indonesia
p.10
unresolved
org
Minister of Law
p.10
unresolved
org
BAPEPAM
p.10 ×6
unresolved
org
Financial Services Authority
p.10 ×2
unresolved
org
Indonesia Stock Exchange
p.11
unresolved
org
BAPEPAM-LK
p.11 ×8
unresolved
org
Kementerian Hukum dan Hak Asasi Manusia Republik
p.12
unresolved
org
Ministry of Indonesia
p.12
unresolved
person
Djoko Sumaryono
· Komisaris
p.12
unresolved
person
Cahyo Suryo Putro
· Komisaris Independen
p.12 ×3
unresolved
person
Sudarwanta
· Wakil Presiden Direktur
p.12 ×3
unresolved
person
Sirkuler
· Komisaris
p.12 ×2
unresolved
person
Denny Susanto
· Anggota
p.12 ×2
unresolved
person
Ferdy Bernard Maruhal Amora
· Anggota
p.12
unresolved
person
Limi Mulyanto
· Anggota
p.12
unresolved
org
PT Trans Lintas
p.13
unresolved
org
PT Korporindo Guna
p.13
unresolved
org
PT Sekti Rahayu
p.13 ×2
unresolved
org
PT Abe Jaya
p.13
unresolved
org
Koordinasi
p.13
unresolved
org
Menteri Energi
p.13 ×2
unresolved
org
Menteri Investasi
p.13
unresolved
org
Minister of Energy
p.13
unresolved
org
Minister of Investment and Downstreaming
p.13
unresolved
org
PT Exploitasi Energi
p.14
unresolved
org
Indonesia Tbk
p.14 ×3
unresolved
org
Pengawas Pasar Modal
p.14
unresolved
org
Menteri Energi dan Sumber Daya Mineral Republik
p.24 ×2
unresolved
org
Minister of Energy and Mineral Resources
p.24
unresolved
org
Ministry of Energy
p.34
unresolved
org
PT Borneo Inter Aero
p.35 ×2
unresolved
org
PT Bukit Intan Sedjati International
p.35 ×2
unresolved
org
PT Permata Bintang Borneo
p.35 ×2
unresolved
org
PT PLN Indonesia Power
p.35 ×4
unresolved
org
PT PLN Nusantara Power
p.35 ×3
unresolved
org
PT Borneo Guna Laksana
p.35 ×2
unresolved
org
PT Energi Sinar Bara
p.35 ×2
unresolved
org
PT Kalimantan Prima Persada
p.35 ×2
unresolved
org
PT Trans Jaya Perkasa
p.35 ×8
unresolved
org
PT Rian Pratama Mandiri
p.35 ×2
unresolved
org
PT PLN (Persero)
p.35 ×12
unresolved
org
PT Indomarta Multi Mining
p.35 ×2
unresolved
org
PT Oktasan Baruna Persada
p.35 ×2
unresolved
org
PT Milta Lintas Samudera
p.35 ×2
unresolved
org
PT Mitra Hasrat Bersama
p.35 ×2
unresolved
org
PT Mitra Cipta Multi Sukses
p.35 ×2
unresolved
org
PT Cipta Prima Energi Indonesia
p.35 ×6
unresolved
org
PT Rukuy Jaya Abadi
p.35
unresolved
org
PT Rukuy Jaya Abadi CV Mitra Bumi Sejahtera
p.35
unresolved
org
PT Pelayaran Sayusan Bahari
p.35 ×2
unresolved
org
PT Cahaya Marhan Naya
p.35
unresolved
org
PT Cahaya Marhan Naya Lain-lain
p.35
unresolved
org
PT PLN Nusantara Power Subjumlah
p.35
unresolved
org
PT Banua Konstruksi Nusantara
p.36 ×2
unresolved
org
PT Truba Dewata Guna Prasada
p.36 ×2
unresolved
org
PT Cipta Prima Power
p.36 ×2
unresolved
org
PT Daya Guna Laksana
p.36 ×6
unresolved
org
PT Multi Guna Laksana
p.36
unresolved
org
PT Multi Guna Laksana Lain-lain
p.36
unresolved
org
PT Asuransi Sinar Mas
p.40 ×2
unresolved
org
Rizki Djunaedy dan Rekan
p.40
unresolved
org
Shandong Huatai Co., Ltd.
p.42
unresolved
org
PT Perusahaan Pelayaran Rusianto Bersaudara
p.43
unresolved
org
PT Trans Kalimantan Perkasa
p.43 ×4
unresolved
org
PT Lumoso Pratama Line
p.43
unresolved
org
PT Lumoso Pratama Line CV Hidayah
p.43
unresolved
org
PT Sinarmas LDA Maritime
p.43 ×2
unresolved
org
PT Bahtera Energi Samudra Tuah
p.43 ×2
unresolved
org
PT Bintang Ocean Sinergy
p.43 ×2
unresolved
org
PT Gerak Perdana Lestari
p.43 ×2
unresolved
org
PT Sumber Rejeki Samudra Jaya
p.43 ×2
unresolved
org
PT Pandi Proteksi
p.43 ×2
unresolved
org
PT Pelayaran Armada Nasional Indonesia CV Multi Bara
p.43
unresolved
org
PT Pelayaran Mitra Kaltim Samudera
p.43 ×2
unresolved
org
PT Mitra Bahari Internusa
p.43 ×2
unresolved
org
PT Trans Maritim Pratama
p.43
unresolved
org
PT Trans Maritim Pratama Lain-lain
p.43
unresolved
person
Notary Dahlia
p.45
unresolved
org
PT AB
p.46
unresolved
org
PT AB Sinar Mas Sinar Mas Multifinance.
p.46
unresolved
org
PT Trans Guna Perkasa
p.46 ×2
unresolved
org
PT Sinar Surya Borneo
p.46
unresolved
org
PT Sinar Surya Borneo Lain-lain
p.46
unresolved
org
PT AB Sinar Mas Multifinance
p.46 ×10
unresolved
org
PT Sinar
p.47 ×2
unresolved
org
PT AB Sinar
p.48
unresolved
org
PT AB Sinar Mas
p.49
unresolved
org
PT Sinergi Laksana Bara Mas
p.49 ×14
unresolved
org
PT Berau
p.49
unresolved
org
PT Sinergi Laksana Bara
p.49
unresolved
org
PT Sinergi Laksana Bara Rp
p.50
unresolved
org
KKA Azwir Arifin & Rekan
p.53 ×2
unresolved
org
Minister of Sumber Daya Mineral
p.55
unresolved
org
PT Saibatama Internasional Mandiri
p.56
unresolved
org
PT Saibatama Internasional Mandiri Masyarakat
p.56
unresolved
—
Masyarakat (di bawah 5%)
p.56 ×2
unresolved
org
PT Dwi Guna
p.57 ×2
unresolved
org
Laksana Tbk
p.57 ×2
unresolved
org
PT Dwi Guna Laksana Tbk’s
p.57
unresolved
org
PT Korporindo Indonesia
p.60
unresolved
org
PT Korporindo Indah
p.60
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.