Skip to content
Back to announcement

20250718_BYAN_Informasi Transaksi Afiliasi_31916041_lamp5.pdf

Asset transaction Needs review BYAN

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 109

Page 1
      LAPORAN PENILAIAN PROPERTI
                   Untuk Keperluan :


 PT BAYAN RESOURCES TBK
             Jenis & Lokasi Properti :
     Aset milik PT Fajar Sakti Prima, meliputi :
1. Tanah Jetty Muara Pahu BL1-BL3 dan
   Tanah KM 0-8 CHR Muara Pahu
2. Bangunan
3. Jetty & Dermaga
4. Infrastruktur
5. Mesin dan Peralatan
6. Alat Berat & Kendaraan
7. Konstruksi BL 3A (Construction In Progress)
8. Construction In Progress
9. Sparepart
Page 2
                                           R e g is t e re d P r o p er t y & B u s in e s s A p p r a is e r s
                                          No. Izin K J P P 2.15.00128 Wilayah Kerja Seluruh Indonesia




      Jakarta, 24 Juni 2025


      File No : 00075/2.0128-03/PI/02/0478/1/VI/2025
      Perihal : Laporan Penilaian Properti


      Kepada Yth,
      PT BAYAN RESOURCES TBK
      Gedung Office 8, Lantai 37, Unit A-H
      Jl. Senopati No. 8B
      Senayan, Kebayoran Baru
      Kota ADM Jakarta Selatan
      DKI Jakarta - 12190

      Dengan hormat,
      Sesuai dengan Lingkup Penugasan yaitu Surat Penawaran No. 101/SP-DAZ/PDM-
      BR/VI/2025 pada tanggal 04 Juni 2025 yang telah disepakati antara PT Bayan Resources
      Tbk dengan KJPP Dedy, Arifin, Nazir dan Rekan (KJPP DAZ & REKAN), serta dalam batas-
      batas kemampuan kami sebagai Penilai Publik berdasarkan izin usaha dari Menteri
      Keuangan dengan No. 391/KM.1/2015 tanggal 16 Juni 2015, dengan ini menyatakan
      bahwa kami telah melaksanakan inspeksi/investigasi lapangan, menganalisis dan
      melakukan penilaian atas properti yang dimaksud serta memberikan pendapat/opini
      seperti tercantum dalam laporan dan menyampaikan laporan ini kepada pemberi
      tugas dan pengguna laporan.
      Penilaian ini dilakukan sesuai dengan kapasitas kami selaku Kantor Jasa Penilai Publik
      berdasarkan Surat Izin Usaha Kantor Jasa Penilai Publik Dedy, Arifin, Nazir dan Rekan
      (untuk selanjutnya disebut “KJPP DAZ & REKAN”) dari Menteri Keuangan Republik
      Indonesia No. 2.15.00128, maka kami melaporkan sebagai berikut :

      1.   STATUS PENILAI
           Penilai KJPP DAZ & REKAN memiliki kapasitas untuk memberikan penilaian yang
           objektif dan tidak memihak. Penilai KJPP DAZ & REKAN tidak memiliki keterlibatan
           material atau benturan kepentingan baik aktual maupun bersifat potensial dengan
           subjek dan/atau objek penilaian. Penilai KJPP DAZ & REKAN memiliki kompetensi
           yang diperlukan untuk melakukan penilaian. Penilai KJPP DAZ & REKAN dapat
           menggunakan tenaga ahli atau penilai lain di luar KJPP DAZ & REKAN sesuai
           kebutuhan penugasan, dengan izin dari Pemberi Tugas.
           Seluruh penilai, ahli, dan staf pelaksana yang menandatangani laporan ini
           merupakan satu tim penugasan, dengan tugas dan tanggung jawab masing-
           masing, yang dikoordinasikan oleh penilai berijin atau penanggung jawab laporan.

      2.   IDENTITAS PEMBERI TUGAS
           Pemberi Tugas adalah sebagai berikut :
           Nama Perusahaan               : PT BAYAN RESOURCES TBK
           Alamat                        : Gedung Office 8, Lantai 37, Unit A-H
                                          Jl. Senopati No. 8B
                                          Senayan, Kebayoran Baru
                                          Kota ADM Jakarta Selatan, DKI Jakarta - 12190
JAKARTA BRANCH OFFICE :                                                                                                    HEAD OFFICE :
Apple 1 Condovilla, Unit C/Q/GF/07                                                            The Bellagio Boutique Mall Lt. 1 No. OL2-03
Jl. Jati Padang Raya, Pasar Minggu                                                    Jl. Mega Kuningan Barat Kav. E4.3, Kuningan Timur,
Jakarta Selatan - 12540                                                                                Setiabudi, Jakarta Selatan - 12950
Phone/fax : (021) 27844160                                                                            Website : www.kjppdazrekan.co.id
Email : contact1kjppdazrekan@gmail.com
         contact1@kjppdazjakarta.co.id

 Kantor Pusat : Jakarta Selatan (P)                Kantor Cabang : Jakarta Selatan (PB); Pekanbaru (P); Medan (P)
Page 3
3.   IDENTITAS PENGGUNA LAPORAN
     Pengguna Laporan adalah sebagai berikut :
     Nama Perusahaan           : PT BAYAN RESOURCES TBK
     Alamat                    : Gedung Office 8, Lantai 37, Unit A-H
                                Jl. Senopati No. 8B
                                Senayan, Kebayoran Baru
                                Kota ADM Jakarta Selatan, DKI Jakarta - 12190

4.   OBJEK PENILAIAN
     Objek penilaian dalam pekerjaan ini adalah Penilaian Aset milik PT Fajar Sakti Prima
     yang beralamat di Kecamatan Muara Pahu dan Mook Manaar Bulatn, Kabupaten
     Kutai Barat, Kalimantan Timur. Aset yang dinilai sebagai berikut :
     1. Tanah Jetty Muara Pahu BL1-BL3 dan Tanah KM 0-8 CHR Muara Pahu
     2. Bangunan
     3. Jetty & Dermaga
     4. Infrastruktur
     5. Mesin dan Peralatan
     6. Alat Berat & Kendaraan
     7. Konstruksi BL 3A (Construction In Progress)
     8. Construction In Progress
     9. Sparepart.

5.   MAKSUD DAN TUJUAN PENILAIAN
     Penugasan ini dilakukan dengan maksud untuk memberikan opini independen atas
     Nilai Pasar (Market Value) dari objek penilaian untuk tujuan Transaksi / Akuisisi Aset.

6.   DASAR NILAI DAN PENDEKATAN PENILAIAN
     Sesuai dengan maksud dan tujuannya, maka dasar nilai yang digunakan dalam
     penilaian ini adalah Nilai Pasar (Market Value).
     Nilai Pasar (Market Value) didefinisikan sebagai estimasi sejumlah uang yang dapat
     diperoleh dari hasil penukaran suatu aset atau liabilitas pada tanggal penilaian,
     antara pembeli yang berminat membeli dengan penjual yang berminat menjual,
     dalam suatu transaksi bebas ikatan, yang pemasarannya dilakukan secara layak, di
     mana kedua pihak masing-masing bertindak atas dasar pemahaman yang
     dimilikinya, kehati-hatian dan tanpa paksaan (SPI 101 - 3.1, Edisi VII - 2018).
     Dalam melaksanakan pekerjaan penilaian atas objek penilaian berupa tanah jetty
     dan hauling road, pendekatan penilaian yang digunakan adalah Pendekatan
     Pasar (Market Approach) Sedangkan objek penilaian berupa bangunan, jetty dan
     dermaga, infrastruktur, mesin dan peralatan, alat berat dan kendaraan, konstruksi
     BL 3A, Construction In Progress, serta sparepart pendekatan penilaian yang
     digunakan adalah Pendekatan Biaya (Cost Approach).

7.   TANGGAL PENILAIAN

     Tanggal penilaian ditetapkan pada tanggal 16 Juni 2025.




                                            - ii -
Page 4
8.   TINGKAT KEDALAMAN INVESTIGASI

     a. Penilai tidak melakukan penyelidikan atas dokumen-dokumen yang digunakan
        dalam proses penilaian,
     b. Terdapat data dan informasi yang relevan yang diambil dari sumber yang layak,
     c. Penelaahan, perhitungan dan analisis dapat dilakukan dengan baik tanpa
        terhalang oleh informasi yang tersembunyi atau sengaja disembunyikan,
     d. Untuk tujuan penilaian tersebut, tidak ada pembatasan dalam melakukan
        inspeksi, penelaahan, perhitungan dan analisis dalam penilaian. Jika terdapat
        pembatasan akan diungkapkan dalam laporan penilaian,
     e. Penilai mempertimbangkan kondisi objek penilaian, namun demikian Penilai tidak
        berkewajiban untuk memeriksa bagian-bagian yang tertutup, tidak terlihat dan
        tidak dapat terjangkau, selain itu Penilai tidak memberikan jaminan bila ada
        pelapukan rayap, gangguan lainnya atau kerusakan lain yang tidak terlihat.
        Kondisi-kondisi yang tidak wajar yang tersembunyi yang membuat efek negatif
        terhadap nilai tidak menjadi tanggung jawab penilai,
     f. Penilaian berdasarkan unit penilaian (agregasi) dan/atau berdasarkan kelompok
        fisik sesuai daya gunanya dan merupakan satu kesatuan lengkap,
     g. Apabila Penilai mengalami keterbatasan akses saat inspeksi, misalnya tidak
        dapat memasuki objek penilaian, sehingga Penilai tidak mengetahui mengenai
        luas, spesifikasi teknis dan kondisi objek penilaian, dimana data mengenai luas,
        spesifikasi teknis dan kondisi objek penilaian tersebut diperoleh dari Pemberi
        Tugas, maka Pemberi Tugas bertanggung jawab atas kebenaran data/informasi
        tersebut. Hasil penilaian dapat berbeda jika data/informasi tersebut tidak sesuai
        dengan keadan sesungguhnya,
     h. Apabila terdapat batasan tingkat kedalaman investigasi lainnya, misalnya
        dilakukannya inspeksi secara sampling, akan kami ungkapkan dalam laporan
        penilaian setiap properti objek penilaian.

9.   PEDOMAN YANG DIGUNAKAN

     Dalam penyusunan laporan penilaian ini, kami mengacu kepada Kode Etik Penilai
     Indonesia (KEPI) dan Standar Penilaian Indonesia (SPI Edisi VII - 2018), yang
     dikeluarkan oleh Asosiasi Masyarakat Profesi Penilai Indonesia (MAPPI).

10. KESIMPULAN NILAI

     Dengan mempertimbangkan seluruh informasi yang relevan dan melakukan
     pemeriksaan terhadap properti yang dinilai yang dilanjutkan dengan melakukan
     analisis dan pengolahan data serta dengan mempertimbangkan faktor-faktor yang
     mempengaruhi nilai, maka kami berpendapat bahwa Nilai Pasar (Market Value)
     objek penilaian per tanggal 16 Juni 2025 :




                                          - iii -
Page 5
                                               Nilai Pasar
                                        Rp3.305.999.298.000,-
    (Tiga Triliun Tiga Ratus Lima Miliar Sembilan Ratus Sembilan Puluh Sembilan Juta Dua
                           Ratus Sembilan Puluh Delapan Ribu Rupiah)

Kami menegaskan bahwa laporan penilaian ini bersifat rahasia, kami tidak bertanggung
jawab terhadap pihak lain selain yang tertulis di dalam laporan penilaian ini dalam
penggunaannya baik sebagian ataupun keseluruhan dari laporan penilaian ini. Kami
tidak memperoleh manfaat atau keuntungan apapun dari properti yang kami nilai serta
nilai yang kami laporkan, baik pada saat ini maupun di masa yang akan datang.
Demikian penilaian properti ini disampaikan secara objektif dan bebas dari konflik
kepentingan dalam kapasitas kami sebagai Kantor Jasa Penilai Publik.


Hormat kami,
KJPP Dedy, Arifin, Nazir dan Rekan




Pardomuan, S.T.P., M.M., MAPPI (Cert.)
Pemimpin Cabang Jakarta Selatan
No. Izin Penilai (Bisnis)   : B-1.12.00327
No. Izin Penilai (Properti) : P-1.17.00478
No. STTD - OJK              : STTD.PPB-46/PJ-1/PM.02/2023
No. STTD – IKNB             : 167/NB-122/STTD-P/2019
No. MAPPI                   : 08-S-02181
No.Reg.                     : 00288.2017




                                                - iv -
Page 6
                                i.PERNYATAAN PENILAI

Dalam batas kemampuan dan keyakinan kami sebagai penilai, kami yang bertanda
tangan dibawah ini menyatakan bahwa :
1.    Pernyataan dalam laporan penilaian ini, sebatas pengetahuan kami adalah
      benar dan akurat.
2.    Analisis, opini, dan kesimpulan yang dinyatakan di dalam laporan penilaian ini
      dibatasi oleh asumsi dan batasan-batasan yang diungkapkan dalam laporan
      penilaian, yang mana merupakan hasil analisis, opini dan kesimpulan penilai yang
      tidak berpihak dan tidak memiliki benturan kepentingan.
3.    Kami tidak mempunyai kepentingan baik sekarang ataupun di masa yang akan
      datang terhadap properti yang dinilai, maupun memiliki kepentingan pribadi atau
      keberpihakan kepada pihak-pihak lain yang memiliki kepentingan terhadap
      properti yang dinilai.
4.    Penunjukan dalam penugasan ini tidak berhubungan dengan opini penilaian
      yang telah disepakati sebelumnya dengan pemberi tugas.
5.    Imbalan jasa profesional yang kami terima tidak dikaitkan dengan nilai yang telah
      ditentukan sebelumnya atau gambaran nilai yang diinginkan oleh pemberi tugas,
      besaran opini nilai, pencapaian hasil yang dinyatakan, atau adanya kondisi yang
      terjadi kemudian (subsequent event) yang berhubungan secara langsung dengan
      penggunaan yang dimaksud.
6.    Proses penilaian yang dilakukan ini sesuai dengan ketentuan Standar Penilaian
      Indonesia (SPI) yang berlaku, Kode Etik Penilai Indonesia (KEPI) yang dikeluarkan
      oleh Masyarakat Profesi Penilai Indonesia (MAPPI).
7.    Kami telah memenuhi persyaratan pendidikan profesional yang ditetapkan dan
      diselenggarakan oleh MAPPI (Masyarakat Profesi Penilai Indonesia).
8.    Kami memiliki pengetahuan yang memadai sehubungan dengan properti
      dan/atau jenis objek yang dinilai.
9.    Kami telah melaksanakan ruang lingkup sebagai berikut :
      a.   Identifikasi masalah (identifikasi batasan, tujuan dan objek, definisi penilaian
           dan tanggal penilaian),
      b.   Tanggal Penilaian ditetapkan pada tanggal 16 Juni 2025,
      c.   Inspeksi lapangan dan verifikasi data,
      d.   Analisis data,
      e.   Estimasi nilai dengan menggunakan pendekatan penilaian,
      f.   Penulisan laporan penilaian.
10.   Kami telah melaksanakan inspeksi lapangan terhadap objek penilaian.
11.   Tidak ada penilai lainnya yang bertanda tangan di bawah ini, yang telah terlibat
      dalam pelaksanaan inspeksi, analisis, pembuatan kesimpulan dan opini
      sebagaimana yang dinyatakan dalam laporan penilaian ini.




                                          -v-
Page 7
Penanggung Jawab :




Pardomuan, S.T.P., M.M., MAPPI (Cert.)
No. Izin Penilai (Bisnis)   : B-1.12.00327                  …………………..
No. Izin Penilai (Properti) : P-1.17.00478
No. MAPPI                   : 08-S-02181
No. STTD - OJK              : STTD.PPB-46/PJ-1/PM.02/2023
No. STTD - IKNB             : 167/NB-122/STTD-P/2019



Reviewer :




Muhammad Yusuf Fawwaz, S.T, S.E.
No. MAPPI                : 16-T-06766                       …………………..
No. Reg.                 : RMK-2018.02347




Penilai :




Asrima Melati Daulay, S.T.P.
No. MAPPI                : 12-P-03665                       …………………..
No. Reg.                 : RMK-2021.04107




Surveyor :




Deni Faris Kurniawan, S.T.
No. MAPPI                : 23-A-12110                       …………………..




                                               - vi -
Page 8
                                                               DAFTAR ISI

KATA PENGANTAR .........................................................................................................................i
PERNYATAAN PENILAI .................................................................................................................. v
DAFTAR ISI....................................................................................................................................vii
DAFTAR TABEL .............................................................................................................................. xi
DAFTAR GAMBAR........................................................................................................................xii
DAFTAR GRAFIK .......................................................................................................................... xiii
DAFTAR LAMPIRAN ................................................................................................................... xiv
RINGKASAN PENILAIAN ............................................................................................................ xv
RESUME PENILAIAN PROPERTI .................................................................................................. xvi


BAB I         PENDAHULUAN ............................................................................................................. 1
1.1           Latar Belakang Penugasan ........................................................................................ 1
1.2           Identifikasi Status Penilai ............................................................................................. 1
1.3           Identitas Pemberi Tugas .............................................................................................. 1
1.4           Identitas Pengguna Laporan ..................................................................................... 1
1.5           Objek Penilaian dan Kepemilikan ............................................................................. 2
1.6           Jenis Mata Uang yang Digunakan ........................................................................... 2
1.7           Maksud dan Tujuan Penilaian .................................................................................... 2
1.8           Dasar Nilai ..................................................................................................................... 2
1.9           Pendekatan Penilaian dan Alasan Penerapannya ................................................ 2
1.10          Tanggal Penilaian ........................................................................................................ 3
1.11          Ruang Lingkup Penugasan ........................................................................................ 3
1.12          Tingkat Kedalaman Investigasi .................................................................................. 4
1.13          Sifat dan Sumber Informasi yang Dapat Diandalkan ............................................. 4
1.14          Asumsi dan Asumsi Khusus .......................................................................................... 4
1.15          Sifat Penugasan ........................................................................................................... 5
1.16          Persyaratan Atas Persetujuan untuk Publikasi .......................................................... 5
1.17          Tanggung Jawab Penilai Terhadap Pihak Lain ....................................................... 5
1.18          Konfirmasi Bahwa Penilaian Dilakukan Berdasarkan SPI ........................................ 5
1.19          Kondisi dan Syarat Pembatas .................................................................................... 5
1.20          Kejadian Setelah Tanggal Penilaian ......................................................................... 6


BAB II        OBJEK PENILAIAN ......................................................................................................... 7
2.1           Objek Tanah Jetty Dermaga dan Hauling Road .................................................... 7
2.1.1         Identifikasi Objek .......................................................................................................... 7




                                                                    - vii -
Page 9
2.1.2    Inspeksi Objek Penilaian ............................................................................................. 7
2.1.3    Legalitas ........................................................................................................................ 7
2.1.4    Lokasi dan Aksesibilitas ............................................................................................... 8
2.1.5    Data Lingkungan ......................................................................................................... 9
2.1.6    Perizinan ........................................................................................................................ 9
2.1.7    Pemanfaatan Tanah Saat Inspeksi............................................................................ 9
2.1.8    Penggunaan Tertinggi dan Terbaik (Highest and Best Use, HBU) .......................... 9
2.2      Objek Bangunan ....................................................................................................... 10
2.2.1    Mess Karyawan Muara Pahu (70 kamar) ............................................................... 10
2.2.2    BUMK Seranai Jaya – Bangun Kantor Muara Pahu ............................................... 11
2.2.3    BUMK Seranai Jaya – Bangun Kantin, Dapur Muara Pahu ................................... 11
2.2.4    Mess Karyawan U1 ..................................................................................................... 12
2.2.5    Mess Karyawan U2 ..................................................................................................... 12
2.2.6    Kantin .......................................................................................................................... 13
2.2.7    Mess A ......................................................................................................................... 14
2.2.8    Mess B .......................................................................................................................... 14
2.2.9    Mess C ......................................................................................................................... 15
2.2.10   Mess D dan E .............................................................................................................. 15
2.2.11   Mess U3 ....................................................................................................................... 16
2.2.12   Mess U4 ....................................................................................................................... 16
2.2.13   Jembatan Walkway 108 meter................................................................................ 17
2.2.14   Laundry Camp B – BUMKAM Seranai Jaya ............................................................ 17
2.2.15   Jembatan Walkway 43 meter.................................................................................. 18
2.2.16   Rumah Penawasan Settling Pond 1 ........................................................................ 18
2.2.17   Rumah Penawasan Settling Pond 2 ........................................................................ 18
2.2.18   Gudang Camp Service dan Maintenance ........................................................... 19
2.2.19   Pos Security Camp B ................................................................................................. 19
2.2.20   Jembatan Walkway 32 meter.................................................................................. 20
2.2.21   Rumah Panel Tower Telkomsel ................................................................................. 20
2.2.22   Mess Motorist .............................................................................................................. 20
2.2.23   Mess Karyawan U5 ..................................................................................................... 21
2.2.24   Mess Karyawan U6 ..................................................................................................... 22
2.2.25   Jembatan Walkway 60 meter.................................................................................. 22
2.2.26   Mess Karyawan Putri 60 Unit ..................................................................................... 23
2.2.27   Kantin non-Staff ......................................................................................................... 23
2.2.28   Power House dan Panel Room ................................................................................ 24
2.2.29   Musholla Camp B – Muara Pahu ............................................................................. 24




                                                               - viii -
Page 10
2.2.30    Mess Karyawan U1, U2, U3 total 78 kamar ............................................................. 25
2.2.31    Mess Karyawan U4, U5, U6 total 78 kamar ............................................................. 25
2.2.32    Mess tamu 20 unit, rumah laundry, kantin dan dapur, gudang camp service
          dan pos security KM5 ................................................................................................ 26
2.2.33    Mess Dept Head 40 unit ............................................................................................ 29
2.2.34    Masjid KM5 .................................................................................................................. 30
2.2.35    Pos PAM OBVITNAS .................................................................................................... 31
2.2.36    Control Room Main Office Muara Pahu ................................................................. 31
2.2.37    Pos Security ................................................................................................................. 32
2.2.38    Rumah Penawasan Settling Pond Abit ................................................................... 32
2.2.39    Office Barging CHP ................................................................................................... 33
2.2.40    Office QC CHP ........................................................................................................... 33
2.2.41    Office Buyer dan Surveyor CHP ............................................................................... 34
2.2.42    Kantin dan Dapur Security ....................................................................................... 35
2.2.43    Pos Security Jetty ....................................................................................................... 35
2.2.44    Pos PAM OBVITNAS Jetty .......................................................................................... 36
2.2.45    Gudang Tawas dan Kapur Abit ............................................................................... 36
2.2.46    Mess Karantina 20 Kamar Jetty ................................................................................ 37
2.2.47    Extend Kantin Camp C KM 5 Abit ........................................................................... 37
2.2.48    Sport Hall ..................................................................................................................... 38
2.2.49    Rumah Server Telkomsel T0 ....................................................................................... 38
2.2.50    Warehouse CHP 3 Unit .............................................................................................. 38
2.2.51    Bayan Mart ................................................................................................................. 39
2.2.52    Control Room Jetty Muara Pahu ............................................................................. 39
2.2.53    Coal Lab ..................................................................................................................... 40
2.2.54    Side Dump Office ...................................................................................................... 40
2.3       Objek Sarana Jetty Dermaga .................................................................................. 41
2.4       Objek Infrastruktur ...................................................................................................... 41
2.5       Objek Mesin dan Peralatan ..................................................................................... 41
2.6       Objek Alat Berat dan Kendaran .............................................................................. 43
2.7       Objek Construction in Progress Jetty dan Dermaga............................................. 44
2.8       Objek Construction in Progress Bangunan ............................................................. 44
2.9       Objek Sparepart ........................................................................................................ 44


BAB III   DATA PASAR ............................................................................................................... 45
3.1       Pertumbuhan Ekonomi Global ................................................................................ 45
3.2       Pertumbuhan Ekonomi Indonesia ........................................................................... 46




                                                                - ix -
Page 11
3.3      Inflasi ............................................................................................................................ 47
3.4      Nilai Tukar Rupiah....................................................................................................... 47
3.5      Suku Bunga BI-Rate ................................................................................................... 48
3.6      Perkembangan Investasi .......................................................................................... 48
3.7      Tinjauan Umum Industri Batubara ............................................................................ 49
3.7.1    Proyeksi Bauran Energi di Indonesia ........................................................................ 49
3.7.2    Sumberdaya dan Cadangan Batubara di Indonesia .......................................... 50
3.7.3    Produksi dan Ekspor Batubara ................................................................................. 50
3.7.4    Konsumsi Domestik Batubara ................................................................................... 52
3.7.5    Harga Batubara Acuan ............................................................................................ 53
3.7.6    Aktivitas Penunjang Pertambangan dan Penggalian Lainnya ........................... 53
3.8      Tinjauan Umum Kendaraan dan Alat Berat ........................................................... 55
3.8.1    Pasar untuk Kendaraan Alat Berat .......................................................................... 55
3.8.2    Segmentasi Pasar Kendaraan Alat Berat ............................................................... 56
3.8.3    Pemain Pasar Utama Alat Konstruksi Berat ............................................................ 57
3.9      Tinjauan Pasar Properti Komersial ............................................................................ 58


BAB IV   PENILAIAN PROPERTI .................................................................................................. 61
4.1      Metode Penilaian ...................................................................................................... 61
4.1.1    Pendekatan Pasar (Market Approach) .................................................................. 61
4.1.2    Pendekatan Pendapatan (Income Approach) .................................................... 62
4.1.3    Pendekatan Biaya (Cost Approach) ...................................................................... 62
4.2      Pemilihan Metode Penilaian .................................................................................... 63
4.3      Penerapan Metode Penilaian ................................................................................. 63
4.3.1    Tanah Jetty Muara Pahu BL1-BL3 dan Tanah KM 0-8 CHR Muara Pahu ............ 63
4.3.2    Bangunan ................................................................................................................... 65
4.3.3    Jetty dan Dermaga, serta Konveyor ....................................................................... 67
4.3.4    Infrastruktur ................................................................................................................. 68
4.3.5    Mesin dan Peralatan ................................................................................................. 68
4.3.6    Alat Berat dan Kendaran ......................................................................................... 70
4.3.7    Construction In Progress (Konstruksi BL 3A) ............................................................. 72
4.3.8    Construction In Progress ............................................................................................ 73
4.3.9    Sparepart Inventori .................................................................................................... 73
4.4      Rekonsiliasi Nilai .......................................................................................................... 74
4.5      Kesimpulan Nilai ......................................................................................................... 74




                                                                 -x-
Page 12
                                             DAFTAR TABEL

Tabel 1.    Mesin dan Peralatan ....................................................................................... 42
Tabel 2.    Alat Berat dan Kendaraan............................................................................. 43
Tabel 3.    Tingkat Perekonomian Dunia ......................................................................... 45
Tabel 4.    Indikator Makro Ekonomi Nasional Tahun 2021 – 2025 ............................... 46
Tabel 5.    Pertumbuhan Ekonomi Indonesia - Sisi Pengeluaran (%,yoy) .................... 46
Tabel 6.    Pertumbuhan PDB Domestik Berdasarkan Lapangan Usaha (&yoy) ....... 46
Tabel 7.    Negara Tujuan Ekspor Batubara Indonesia (dalam Juta Ton) .................. 51
Tabel 8.    Konsumsi Domestik Batubara per Industri..................................................... 52
Tabel 9.    Klasifikasi Aktivitas Penunjang Batubara ...................................................... 54
Tabel 10.   Uraian Data Pembanding .............................................................................. 64
Tabel 11.   Nilai Pasar Objek Penilaian Tanah ................................................................. 65
Tabel 12.   Nilai Pasar Objek Penilaian Bangunan ......................................................... 65
Tabel 13.   Nilai Pasar Objek Penilaian Jetty Dermaga Line 1 2 3 ................................ 68
Tabel 14.   Nilai Pasar Objek Penilaian Sarana Prasarana ............................................ 68
Tabel 15.   Nilai Pasar Objek Penilaian Konveyor Jetty Muara Pahu BL1-BL3 ............. 68
Tabel 16.   Nilai Pasar Objek Penilaian Mesin dan Peralatan ....................................... 69
Tabel 17.   Nilai Pasar Alat Berat dan Kendaraan .......................................................... 70
Tabel 18.   Nilai Pasar Objek Penilaian Construction In Progress (Konstruksi BL 3A) ... 73
Tabel 19.   Nilai Pasar Objek Penilaian Construction In Progress .................................. 73
Tabel 20.   Nilai Pasar Objek Penilaian Sparepart Inventory ......................................... 74
Tabel 21.   Nilai Pasar Objek Penilaian Aset PT Fajar Sakti Prima .................................. 74




                                                    - xi -
Page 13
                                             DAFTAR GAMBAR

Gambar 1.   Peta Identifikasi Lokasi Objek Penilaian Jetty Dermaga .............................. 8
Gambar 2.   Situasi Lingkungan Sekitar Objek Jetty Dermaga .......................................... 9
Gambar 3.   Persebaran Cadangan Batubara Kalori Sangat Tinggi (>7100kal/g) di
            Indonesia .......................................................................................................... 50
Gambar 4.   Peta Data Pembanding ................................................................................. 64




                                                       - xii -
Page 14
                                           DAFTAR GRAFIK

Grafik 1.    Inflasi IHK dan Komponen Inflasi .................................................................... 47
Grafik 2.    Perkembangan Nilai Tukar Rupiah 2024 dan 2023 ...................................... 48
Grafik 3.    Perkembangan Realisasi Investasi Tahun 2019 - 2024 (Rp Triliun) ............. 49
Grafik 4.    Proyeksi Bauran Energi di Indonesia Tahun 2021 - 2030 .............................. 49
Grafik 5.    Tingkat Produksi dan Penjualan Batubara di Indonesia ............................. 51
Grafik 6.    Negara Tujuan Ekspor Batubara Indonesia 2024 ........................................ 52
Grafik 7.    Rata-rata Harga Batubara Acuan (HBA) ..................................................... 53
Grafik 8.    Permintaan Pasar Kendaraan dan Alat Konstruksi Berat ........................... 56
Grafik 9.    Pasar Alat Konstruksi Berat Berdasarkan Jenis Peralatan ........................... 57
Grafik 10.   Indeks Demand Kategori Sewa (%yoy) ........................................................ 59
Grafik 11.   Indeks Demand Kategori Jual (%yoy) ........................................................... 59
Grafik 12.   Indeks Supply Kategori Sewa (%yoy) ............................................................ 59
Grafik 13.   Indeks Supply Kategori Jual (%yoy)............................................................... 59
Grafik 14.   Indeks Harga Kategori Sewa (%yoy) ............................................................. 60
Grafik 15.   Indeks Harga Kategori Jual (%yoy) ............................................................... 60




                                                   - xiii -
Page 15
             DAFTAR LAMPIRAN


Lampiran 1




                  - xiv -
Page 16
                             ii.RINGKASAN PENILAIAN


Nama Pemberi Tugas       :   PT BAYAN RESOURCES TBK
dan Pengguna Laporan
Alamat                   :   Gedung Office 8, Lantai 37, Unit A-H, Jl. Senopati No. 8B,
                             Senayan, Kebayoran Baru, Kota ADM Jakarta Selatan, DKI
                             Jakarta - 12190.
Jenis Properti           :   Aset milik PT Fajar Sakti Prima yang beralamat di Kec. Muara
                             Pahu dan Mook Manaar Bulatn, Kab. Kutai Barat, Kalimantan
                             Timur. Aset yang dinilai sebagai berikut :
                             1. Tanah Jetty Muara Pahu BL1-BL3 dan Tanah KM 0-8 CHR
                                Muara Pahu
                             2. Bangunan
                             3. Jetty & Dermaga
                             4. Infrastruktur
                             5. Mesin dan Peralatan
                             6. Alat Berat & Kendaraan
                             7. Konstruksi BL 3A (Construction In Progress)
                             8. Construction In Progress
                             9. Sparepart
Bentuk Hak Kepemilikan   :    Surat Pelepasan Hak
Maksud dan Tujuan        :   Memberikan pendapat atau opini Nilai Pasar (Market Value)
Penilaian                    untuk tujuan Transaksi / Akuisisi Aset.
Tanggal Inspeksi         :   12 - 16 Juni 2025
Tanggal Penilaian        :   16 Juni 2025
Dasar Nilai              :   Nilai Pasar (Market Value)
Pendekatan Penilaian     :   Pendekatan Pasar (Market Approach) untuk Objek Tanah, dan
                             Pendekatan Biaya (Cost Approach) untuk Objek Bangunan,
                             Jetty & Dermaga, Sarana & Prasarana, Mesin & Peralatan,
                             Alat Berat & Kendaraan, Konstruksi BL 3A, Construction In
                             Progress, serta Sparepart.
Metode Penilaian         :   Metode Perbandingan Data Pasar (Market Comparison
                             Method) untuk Objek Tanah, dan Metode Biaya Pembuatan/
                             Penggantian Baru (Depreciated Replacement Cost Method)
                             untuk Bangunan, Jetty & Dermaga, Sarana & Prasarana,
                             Mesin & Peralatan, Alat Berat & Kendaraan, Konstruksi BL 3A,
                             Construction In Progress, serta Sparepart.
Jenis Laporan            :   Laporan Penilaian lengkap (Narrative Report)
Asumsi                   :   Penilaian kami adalah berdasarkan pada beberapa asumsi
                             utama yang dijelaskan pada laporan ini. Properti yang menjadi
                             objek penilaian bukan merupakan properti khusus.
Kesimpulan Nilai
Nilai Pasar              :   Rp3.305.999.298.000,-
(terbilang)              :   (Tiga Triliun Tiga Ratus Lima Miliar Sembilan Ratus Sembilan Puluh
                             Sembilan Juta Dua Ratus Sembilan Puluh Delapan Ribu Rupiah)




                                        - xv -
Page 17
                                     iii.RESUME PENILAIAN PROPERTI
                                                Untuk Keperluan
                                          PT BAYAN RESOURCES TBK

                                                                     Nilai Pasar         Nilai Pasar
No.                 Objek Penilaian                     Luas (m²)
                                                                        (USD)               (IDR)
 >)   M uara Pahu

      A. Tanah
         Tanah Jetty M uara Pahu BL1-BL3                 5.058.626           1.362.069       22.192.192.000
         Tanah KM 0 - 8 CHR M uara Pahu                  5.000.823           2.890.153       47.089.258.000
      B. Bangunan                                                            9.706.958      158.155.468.000
      C. Jetty & Dermaga                                                    56.646.081      922.934.600.000
      D. Infrastruktur                                                      14.210.516      231.531.933.000
      E. M esin dan Peralatan                                               89.026.308    1.450.505.632.000
      F. Alat Berat & Kendaraan                                              5.995.228       97.680.253.000
      G. Konstruksi BL 3A (Construction In Progress )                        7.759.649      126.427.953.000
      H. Construction In Progress                                             627.910        10.230.537.000
       I. Sparepart                                                         14.684.310      239.251.472.000

                          Total Nilai                                     202.909.182    3.305.999.298.000


 Catatan Khusus :
1.    Pada saat peninjauan lokasi kami didampingi oleh pihak Staf.
2.    Properti yang dinilai berupa Aset milik PT Fajar Sakti Prima.
3.    Penilaian objek berdasarkan list aset dari pihak Pemberi Tugas, secara bersamaan
      pengecekan dan verifikasi di lapangan
4.    Kurs USD yang digunakan pada tanggal penilaian 16 Juni 2025.




                                                          - xvi -
Page 18
                                            BAB I
                                     iv.PENDAHULUAN


1.1   Latar Belakang Penugasan
      PT Bayan Resources Tbk berencana untuk mengakuisisi aset milik PT Fajar Sakti Prima
      yang merupakan salah satu anak perusahaannya. Aset-aset tersebut berada di
      Kecamatan Muara Pahu dan Mook Manaar Bulatn, Kabupaten Kutai Barat,
      Kalimantan Timur, sesuai dengan objek penilaian pada laporan ini. PT Bayan
      Resources Tbk memerlukan informasi terkait nilai pasar atas aset yang akan diakuisisi,
      sehingga diperlukan Jasa Penilai Publik untuk memberikan opini Nilai Pasar terhadap
      objek penilaian tersebut. Laporan yang disampaikan oleh Penilai merupakan suatu
      Laporan Penilaian lengkap dan terinci yang mendeskripsikan informasi secara detil
      dan komprehensif dan mengandung seluruh informasi yang signifikan dalam
      penilaian, termasuk pembahasan secara mendetil atas objek penilaian.

1.2   Identifikasi Status Penilai
      KJPP DAZ & REKAN merupakan Persekutuan Perdata (Partnership) yang bergerak
      dalam bidang Penilaian Bisnis dan Properti. KJPP DAZ & REKAN memiliki kompetensi
      sebagai penilai publik dengan izin dari Menteri Keuangan No. 2.15.00128,
      berdasarkan Keputusan Menteri Keuangan No. 391/KM.1/2015, tanggal 15 Mei 2015
      dan mengikuti pelatihan pengembangan profesi (Continuing Professional
      Development/CPD) yang disyaratkan.
      • Keputusan Menteri Keuangan Republik Indonesia No. 384/KM.1/2012, tanggal 12
        April 2012, tentang izin Penilai Publik di Bidang Jasa Penilaian Bisnis (B) dengan Izin
        Penilai Bisnis No. B-1.12.00327,
      • Keputusan Menteri Keuangan Republik Indonesia No. 396/KM.1/2017, tanggal 5
        April 2017, tentang izin Penilai Publik di Bidang Jasa Penilaian Properti (P) dengan
        Izin Penilai Properti No. P-1.17.00478.
      Dalam penugasan ini kami bertindak sebagai penilai independen. Kami tidak
      mempunyai kepentingan terhadap objek yang dinilai yang bersifat material maupun
      benturan kepentingan baik aktual maupun bersifat potensial dan imbalan jasa yang
      kami terima tidak terkait dengan hasil penilaian yang dilaporkan.
      KJPP DAZ & REKAN telah berpengalaman dalam melaksanakan pekerjaan penilaian
      berbagai macam jenis Properti yang tersebar di seluruh Indonesia, baik
      properti/usaha perusahaan swasta nasional, multinasional, BUMN, Instansi &
      Lembaga Pemerintah, Pemerintah Daerah dan juga di lingkungan Perbankan dan
      lembaga-lembaga keuangan lainnya.

1.3   Identitas Pemberi Tugas
      Pemberi tugas adalah sebagai berikut :
      Pemberi Tugas             : PT BAYAN RESOURCES TBK
      Alamat                    : Gedung Office 8, Lantai 37, Unit A-H
                                  Jl. Senopati No. 8B
                                  Senayan, Kebayoran Baru
                                  Kota ADM Jakarta Selatan, DKI Jakarta - 12190

1.4   Identitas Pengguna Laporan
      Pengguna laporan peniliaian adalah PT BAYAN RESOURCES TBK.




                                             -1-
Page 19
1.5   Objek Penilaian dan Kepemilikan
      Objek penilaian dalam pekerjaan ini adalah Penilaian Aset milik PT Fajar Sakti Prima
      yang beralamat di Kec. Muara Pahu dan Mook Manaar Bulatn, Kab. Kutai Barat,
      Kalimantan Timur. Aset yang dinilai sebagai berikut :
      1.   Tanah Jetty Muara Pahu BL1-BL3 dan Tanah KM 0-8 CHR Muara Pahu
      2.   Bangunan
      3.   Jetty & Dermaga
      4.   Infrastruktur
      5.   Mesin dan Peralatan
      6.   Alat Berat & Kendaraan
      7.   Konstruksi BL 3A (Construction In Progress)
      8.   Construction In Progress
      9.   Sparepart

1.6   Jenis Mata Uang yang Digunakan
      Kami menilai properti dimaksud dengan menggunakan mata uang Rupiah.
      Penggunaan nilai tukar Rupiah terhadap Dollar Amerika Serikat sesuai pada tanggal
      penilaian yaitu kurs Rp16.293,- per 1 USD.

1.7   Maksud dan Tujuan Penilaian
      Maksud dan tujuan dari penilaian yang telah dilakukan adalah untuk memberikan
      pendapat atau opini Nilai Pasar (Market Value) dari objek penilaian untuk tujuan
      Transaksi / Akuisisi Aset.

1.8   Dasar Nilai
      Sesuai dengan Tujuan penilaian, dasar Nilai yang digunakan adalah Nilai Pasar
      (Market Value).
      Nilai Pasar (Market Value) didefinisikan sebagai estimasi sejumlah uang yang dapat
      diperoleh dari hasil penukaran suatu aset atau liabilitas pada tanggal penilaian,
      antara pembeli yang berminat membeli dengan penjual yang berminat menjual,
      dalam suatu transaksi bebas ikatan, yang pemasarannya dilakukan secara layak, di
      mana kedua pihak masing-masing bertindak atas dasar pemahaman yang
      dimilikinya, kehati-hatian dan tanpa paksaan (SPI 101 - 3.1, Edisi VII - 2018).

1.9   Pendekatan Penilaian dan Alasan Penerapannya
      Dalam penilaian ini, Pendekatan Penilaian yang tepat terhadap objek penilaian
      Tanah Jetty dan Hauling Road dengan Pendekatan Pasar (Market Approach)
      Metode Perbandingan Data Pasar (Market Comparison Method).
      ✓ Konsep Pendekatan Pasar adalah menghasilkan nilai dengan cara
        membandingkan aset yang dinilai dengan aset yang identik atau sebanding,
        yang telah dipasarkan dalam pasar yang terbuka, dimana informasi harga
        transaksi atau penawaran tersedia.
      Data pembanding yang dikumpulkan memiliki karakteristik yang sama dengan
      properti yang dinilai. Hal ini termasuk aspek legalitas, fisik, lokasi dan karakteristik
      penggunaan yang konsisten dengan properti yang dinilai serta merefleksikan kondisi
      di pasar dimana terjadi persaingan dengan properti yang dinilai.
      Sedangkan pendekatan penilaian yang tepat terhadap objek penilaian Bangunan,
      Jetty dan Dermaga, Infrastruktur, Mesin dan Peralatan, Alat Berat dan Kendaraan,
      Konstruksi BL 3A, Construction In Progress, serta Sparepart, dengan Pendekatan




                                             -2-
Page 20
     Biaya (Cost Approach) Metode Penggantian Biaya Baru Terdepresiasi (Depreciated
     Replacement Cost, DRC Method).
      ✓ Pendekatan Pasar tidak dapat diterapkan dalam penilaian ini karena data
        pembanding yang digunakan hanya untuk objek penilaian tanah, sedangkan
        untuk objek penilaian bangunan menggunakan pendekatan biaya;
      ✓ Pendekatan Pendapatan tidak dapat diterapkan dalam penilaian ini karena
        Kurangnya akses terhadap informasi terkait dengan aset yang dinilai (misalnya
        akses ke laporan keuangan historis namun tidak untuk proyeksi/budget) dan
        kurangnya pelaku pasar melihat kemampuan aset menghasilkan pendapatan;
      ✓ Pendekatan Biaya dapat diterapkan dalam penilaian ini karena tanah yang di
        atasnya berdiri bangunan merupakan satu kesatuan yang tidak dapat
        dipisahkan. Data harga penawaran/transaksi dari properti pembanding yang
        sejenis dan sebanding dengan objek penilaian tidak tersedia, dan sesuai dengan
        prinsip kontribusi nilai objek penilaian adalah nilai tanah ditambahkan nilai
        bangunan.
             Estimasi nilai pasar tanah diperoleh melalui pendekatan data pasar, mengingat
             harga penawaran / transaksi properti pembanding tersedia dan indikasi nilai
             pasar bangunan diperoleh dengan pendekatan biaya dengan pertimbangan
             biaya pembuatan / penggantian baru (Depreciated Replacement Cost),
             penyusutan (fisik, fungsi dan ekonomis), umur ekonomis dan kondisi dapat
             ditentukan. Estimasi nilai diperoleh dengan mengurangi RCN (Replacement Cost
             New) dengan penyusutan.
     Pendekatan Biaya (Cost Approach) memberikan indikasi nilai menggunakan prinsip
     ekonomi bahwa pembeli akan membayar aset tidak lebih dari biaya untuk
     mendapatkan aset dengan utilitas yang sama, baik melalui pembelian atau dengan
     pembuatan konstruksi dengan mengecualikan faktor-faktor seperti waktu yang tidak
     semestinya, ketidaknyamanan, risiko atau faktor-faktor lainnya. Pendekatan ini
     memberikan indikasi nilai dengan menghitung biaya pengganti atau reproduksi saat
     ini dari aset dan membuat pengurangan untuk kemunduran fisik dan seluruh bentuk
     keusangan lainnya yang relevan (SPI 106 butir 6.5.a).

1.10 Tanggal Penilaian
     Tanggal penilaian ditetapkan pada tanggal 16 Juni 2025 sesuai dengan tanggal
     terakhir inspeksi lapangan.

1.11 Ruang Lingkup Penugasan
     Ruang lingkup penilaian adalah melakukan inspeksi lapangan, melakukan verifikasi
     antara data yang tersedia yang diberikan oleh pemberi tugas dengan kondisi
     lapangan, kemudian melakukan penilaian atas Properti yang dinilai sesuai dengan
     maksud dan tujuannya, yang dituangkan dalam laporan penilaian ini.
     Investigasi yang dilakukan meliputi aspek fisik, peruntukan, legal dan analisis pasar
     properti, dimana tingkat kedalaman investigasi adalah sebagai berikut :
     Fisik                      :   Penyesuaian kondisi fisik atas objek dengan legalitas yang
                                    kami terima.
     Peruntukan                 :   Pengecekan secara global sesuai dengan tata ruang
                                    objek penilaian.
     Legalitas                  :   Tidak melakukan     pengecekan      keabsahan    legalitas
                                    kepemilikan.
     Analisis Pasar Properti    :   Dilakukan analisis secara global.




                                             -3-
Page 21
1.12 Tingkat Kedalaman Investigasi
     a. Penilai tidak melakukan penyelidikan atas dokumen-dokumen yang digunakan
        dalam proses penilaian,
     b. Terdapat data dan informasi yang relevan yang diambil dari sumber yang layak,
     c. Penelaahan, perhitungan dan analisis dapat dilakukan dengan baik tanpa
        terhalang oleh informasi yang tersembunyi atau sengaja disembunyikan,
     d. Untuk tujuan penilaian tersebut, tidak ada pembatasan dalam melakukan
        inspeksi, penelaahan, perhitungan dan analisis dalam penilaian. Jika terdapat
        pembatasan akan diungkapkan dalam laporan penilaian,
     e. Penilai mempertimbangkan kondisi objek penilaian, namun demikian Penilai tidak
        berkewajiban untuk memeriksa bagian-bagian yang tertutup, tidak terlihat dan
        tidak dapat terjangkau, selain itu Penilai tidak memberikan jaminan bila ada
        pelapukan rayap, gangguan lainnya atau kerusakan lain yang tidak terlihat.
        Kondisi-kondisi yang tidak wajar yang tersembunyi yang membuat efek negatif
        terhadap nilai tidak menjadi tanggung jawab penilai,
     f.   Penilaian berdasarkan unit penilaian (agregasi) dan/atau berdasarkan kelompok
          fisik sesuai daya gunanya dan merupakan satu kesatuan lengkap,
     g. Apabila Penilai mengalami keterbatasan akses saat inspeksi, misalnya tidak dapat
        memasuki objek penilaian, sehingga Penilai tidak mengetahui mengenai luas,
        spesifikasi teknis dan kondisi objek penilaian, dimana data mengenai luas,
        spesifikasi teknis dan kondisi objek penilaian tersebut diperoleh dari Pemberi
        Tugas, maka Pemberi Tugas bertanggung jawab atas kebenaran data/informasi
        tersebut. Hasil penilaian dapat berbeda jika data/informasi tersebut tidak sesuai
        dengan keadan sesungguhnya,
     h. Apabila terdapat batasan tingkat kedalaman investigasi lainnya, misalnya
        dilakukannya inspeksi secara sampling, akan kami ungkapkan dalam laporan
        penilaian setiap properti objek penilaian.

1.13 Sifat dan Sumber Informasi yang Dapat Diandalkan
     Informasi yang diperlukan untuk penilaian ini, diperoleh dari pemberi tugas, dan kami
     tidak memiliki alasan untuk meragukan kebenaran dan keakuratan informasi yang
     diberikan kepada kami tersebut. Apabila informasi tersebut terbukti tidak benar dan
     tidak akurat, maka dapat mempengaruhi akurasi hasil penilaian.
     Informasi selain yang telah diberikan oleh pemberi tugas diperoleh dari pihak lain
     yang kami anggap memadai, antara lain dapat bersumber dari :
     • Pemerintah Daerah sebagai instansi rujukan data dan informasi terkait Peraturan
       Daerah,
     • Bank Indonesia sebagai rujukan kurs,
     • Biro Pusat Statistik,
     • Data riset lembaga independen,
     • Informasi dari media massa cetak dan elektronik.
1.14 Asumsi dan Asumsi Khusus
     a. Legalitas dokumen-dokumen yang digunakan dalam proses penilaian adalah
        benar dan tidak menyesatkan,
     b. Data dan informasi yang relevan yang diperoleh dari sumber yang layak adalah
        benar dan tidak menyesatkan,
     c. Pemberi Tugas telah memberikan informasi yang lengkap mengenai objek
        penilaian dan tidak ada hal-hal yang disembunyikan yang dapat berpengaruh
        secara signifikan terhadap kesimpulan nilai,




                                          -4-
Page 22
     d. Penilai beranggapan bahwa bagian-bagian properti yang tidak diinspeksi tidak
        memiliki kerusakan yang berarti dan tidak menyebabkan perubahan nilai,
     e. Objek penilaian diasumsikan tidak dibangun dengan material ataupun
        mengandung material yang bersifat merusak dan berbahaya,
     f.   Asumsi lain dalam penilaian diungkapkan dalam laporan penilaian,
     g. Asumsi Khusus adalah asumsi yang berbeda dengan fakta yang sebenarnya
        pada tanggal penilaian. Jika terdapat asumsi khusus akan diungkapkan dalam
        laporan penilaian.

1.15 Sifat Penugasan
     Dalam penugasan ini kami bertindak sebagai penilai independen. Kami tidak
     mempunyai kepentingan terhadap properti yang menjadi objek penilaian yang
     bersifat material maupun benturan kepentingan baik aktual maupun bersifat
     potensial dan imbalan jasa yang kami terima tidak terkait dengan hasil penilaian
     yang dilaporkan.

1.16 Persyaratan Atas Persetujuan untuk Publikasi
     Laporan Penilaian dan /atau referensi lainnya hanya ditujukan untuk pemberi tugas
     dan pengguna laporan sebagaimana dimaksud pada Lingkup Penugasan ini.
     Penggunaan laporan di luar dari ketentuan pada lingkup penugasan ini harus
     mendapat persetujuan KJPP Dedy, Arifin, Nazir dan Rekan dan pemberi tugas.

1.17 Tanggung Jawab Penilai Terhadap Pihak Lain
     Penilai tidak bertanggung jawab terhadap pihak-pihak lain, kecuali kepada pemberi
     tugas dan pengguna laporan yang tercantum dalam laporan penilaian.

1.18 Konfirmasi Bahwa Penilaian Dilakukan Berdasarkan SPI
     Analisis, opini, dan kesimpulan yang dibuat oleh Penilai, serta laporan Penilaian telah
     dibuat dengan memenuhi Kode Etik Penilai Indonesia dan Standar Penilaian
     Indonesia Edisi VII - 2018 (KEPI & SPI Edisi VII – 2018) dan peraturan perundang-
     undangan yang berlaku.

1.19 Kondisi dan Syarat Pembatas
     Penilaian dan Laporan Penilaian bergantung kepada syarat-syarat pembatas
     sebagai berikut :
     a. Penilaian ini dibuat atas dasar semua data dan kenyataan yang ada serta
        dilaksanakan sesuai tata cara penilaian yang berlaku,
     b. Penilai tidak mengemukakan pendapat tentang pemilikan properti (Personal
        Property) dan tidak bertanggung jawab atas hal-hal yang menyangkut hukum
        (Personal Property) tersebut, jika ada, telah diabaikan dalam penilaian ini, dan
        properti tersebut dinilai seolah-olah pemilikan dan status adalah jelas dan baik,
        serta bebas dari sengketa, dan sewaktu-waktu dapat diperjualbelikan (sellable)
        untuk dapat dipindahkan haknya kepada pihak lain (transferable),
     c. Nilai Pasar (Market Value) yang dimaksud mencerminkan nilai yang
        sesungguhnya tanpa memperhitungkan adanya kewajiban atas pajak atau
        biaya-biaya yang terkait dengan transaksi penjualan tersebut. Properti yang
        dinilai berdasarkan asumsi bebas dari segala hipotik, persengketaan dan premi
        serta biaya lain yang belum diselesaikan,
     d. Informasi yang telah diberikan oleh pihak lain kepada KJPP Dedy, Arifin, Nazir dan
        Rekan seperti yang disebutkan dalam laporan penilaian dianggap layak dan
        dipercaya, tetapi KJPP Dedy, Arifin, Nazir dan Rekan tidak bertanggung jawab




                                           -5-
Page 23
          jika ternyata informasi yang diberikan itu terbukti tidak sesuai dengan hal yang
          sesungguhnya. Informasi yang dinyatakan tanpa menyebutkan sumbernya
          merupakan hasil penelaahan kami terhadap data yang ada, pemeriksaan atas
          dokumen ataupun keterangan dari instansi pemerintah yang berwenang.
          Tanggung jawab untuk memeriksa kembali kebenaran informasi tersebut
          sepenuhnya berada di pihak pemberi tugas,
     e. Penilai tidak mempunyai kepentingan apapun baik sekarang dan di kemudian
        hari atas properti yang dinilai, demikian juga atas nilai yang dilaporkan,
     f.   Kami tidak melakukan penyelidikan atas kondisi tanah dan fasilitas lingkungan
          lainnya, untuk suatu pengembangan baru. Apabila tidak diinformasikan lain,
          penilaian kami didasarkan pada kewajaran, dan untuk suatu rencana
          pengembangan tidak ada pengeluaran tidak wajar atau keterlambatan dalam
          masa pembangunan,
     g. Gambar/foto, denah ataupun peta yang terdapat dalam laporan ini disajikan
        hanya untuk kemudahan visualisasi saja. Kami tidak melaksanakan pemetaan
        dan tidak bertanggung jawab mengenai hal ini,
     h. Besarnya biaya jasa penilaian tidak tergantung pada besarnya nilai yang
        dilaporkan,
     i.   Nilai yang dicantumkan dalam laporan ini serta setiap nilai lain dalam laporan
          yang merupakan bagian dari objek penilaian hanya berlaku sesuai dengan
          maksud dan tujuan penilaian. Nilai yang digunakan dalam laporan penilaian ini
          tidak boleh digunakan untuk tujuan penilaian lain yang dapat mengakibatkan
          terjadinya kesalahan,
     j.   Laporan ini hanya untuk penggunaan oleh pemberi tugas yang disebut pada
          surat pengantar dan tidak untuk pihak lain. Kami tidak bertanggung jawab bila
          laporan ini dipergunakan pihak ketiga tanpa sepengetahuan dan persetujuan
          kami,
     k.   KJPP Dedy, Arifin, Nazir dan Rekan tidak memperbolehkan penggunaan seluruh,
          sebagian ataupun sebagai rujukan dari Penilaian dari Laporan ini dalam
          dokumen, edaran, pernyataan, referensi ataupun dipublikasikan dalam bentuk
          apapun juga tanpa ijin tertulis dari KJPP Dedy, Arifin, Nazir dan Rekan,
     l.   Kantor Jasa Penilai Publik Dedy, Arifin, Nazir dan Rekan tidak berkewajiban untuk
          memberikan kesaksian atau hadir di depan pengadilan atau pejabat
          pemerintah, jika hal tersebut tidak terkait dengan maksud dan tujuan laporan ini,
          serta di luar ruang lingkup dari penugasan,
     m. Jika dikemudian hari Penilai diminta untuk memberikan penjelasan dan
        pemaparan yang dilakukan di luar wilayah kerja kantor kami, maupun kepada
        pihak selain pemberi tugas dan pengguna jasa, maka segala bentuk biaya yang
        timbul menjadi beban pemberi tugas,
     n. Bahwa objek penilaian yang dinilai tidak sedang atau dinilai oleh Penilai Publik
        lainnya untuk maksud, tujuan, pengguna laporan, dan tanggal penilaian yang
        sama atau berdekatan, (dalam jangka waktu 2 (dua) bulan). Apabila pemberi
        tugas memberikan informasi yang tidak benar, maka laporan dinyatakan tidak
        berlaku,
     o. Laporan Penilaian ini tidak sah apabila tidak dibubuhi tanda tangan Pemimpin
        Rekan atau Rekan dan stempel kantor jasa penilai publik (corporate seal) dari
        KJPP Dedy, Arifin, Nazir dan Rekan.

1.20 Kejadian Setelah Tanggal Penilaian
     Nilai Pasar yang kami sajikan adalah per Tanggal Penilaian yaitu tanggal 16 Juni 2025.
     Kami tidak bertanggung jawab atas perubahan-perubahan yang terjadi yang
     sangat mempengaruhi nilai yang kami sajikan setelah tanggal Penilaian.




                                           -6-
Page 24
                                          BAB II
                                     OBJEK PENILAIAN


2.1   Objek Tanah Jetty Dermaga dan Hauling Road
      2.1.1   Identifikasi Objek
              Lokasi objek yang dinilai berada di Kecamatan Muara Pahu dan Mook
              Manaar Bulatn, Kabupaten Kutai Barat, Provinsi Kalimantan Timur. Elevasi
              tanah pada umumnya sejajar dengan permukaan jalan, objek penilaian
              yang dinilai adalah tanah kosong.
              Kategori
              Kategori dari objek penilaian adalah properti dihuni pemilik. Properti dihuni
              pemilik (owner occupied property) merupakan properti yang dikuasai
              pemilik, baik dihuni maupun tidak dihuni, dipergunakan maupun tidak
              dipergunakan. Dalam penilaian properti tersebut, properti dinilai dengan
              kondisi kepemilikan kosong (vacant possesion).
              Klasifikasi
              Klasifikasi dari objek penilaian adalah aset operasional.
              Bentuk Kepemilikan
              Bentuk Kepemilikan objek penilaian adalah kepemilikan tunggal.
              Dokumen dari Pemberi Tugas
              Surat/dokumen/bukti hak kepemilikan (soft copy atau hard copy) atas objek
              penilaian dari Pemberi Tugas/pemilik aset adalah berupa :
              ✓ Surat Pelepasan Hak Atas Tanah
              Kami telah melakukan konfirmasi dengan pemberi tugas untuk memastikan
              legalitas objek penilaian sehingga tidak ada keraguan yang dapat
              mempengaruhi hasil penilaian.

      2.1.2   Inspeksi Objek Penilaian
              Inspeksi objek penilaian dilakukan oleh Muhammad Yusuf Fawwaz, Deni Faris
              Kurniawan, dan pada tanggal 12 – 16 Juni 2025. Letak dan lokasi objek
              penilaian ditunjukan oleh Staf dari PT Fajar Sakti Prima.

      2.1.3   Legalitas
              Bentuk kepemilikan atas objek penilaian tanah adalah bentuk kepemilikan
              Tunggal, yang berupa Surat Pelepasan Hak. Rincian luas objek dan layout
              objek dapat dilihat pada lampiran. Berikut merupakan rincian luas objek :
              1.   Tanah Jetty Dermaga, dengan luas objek tanah 5.058.626 meter persegi
                   (505,86 Ha),
              2.   Tanah Hauling Road, dengan luas objek tanah 4.982.463 meter persegi
                   (500,08 Ha).
              Rincian bidang tanah
              Berdasarkan data Gambar Peta Tanah dan informasi dari Pemberi
              Tugas/pemilik aset, bidang-bidang tanah dalam bukti hak tersebut
              merupakan bidang tanah yang bersambungan. Kami tidak dapat merincik
              letak lokasi bidang tanah dari setiap bukti hak tersebut ke dalam Gambar
              Peta Tanah dan harus dilakukan pengecekan ke BPN (Badan Pertanahan




                                           -7-
Page 25
        Nasional). Dalam penilaian ini diasumsikan data dan informasi dari Pemberi
        Tugas adalah benar dan Pemberi Tugas bertanggung jawab atas
        kebenaran data dan informasi tersebut. Hasil penilaian dapat berbeda jika
        data dan infomasi tersebut tidak sesuai dengan keadaan sesungguhnya.
        Hubungan Pemberi Tugas dengan Pemegang Hak Objek Penilaian
        Pemberi tugas merupakan pihak yang akan mengakuisisi objek penilaian.
        Pengukuran
        Kami tidak melakukan pengukuran luas bidang tanah tersebut, luas bidang
        tanah adalah sesuai dengan yang tercantum dalam bukti hak
        kepemilikannya.

2.1.4   Lokasi dan Aksesibilitas
        Lokasi dan Identifikasi
        Objek yang dinilai berlokasi di Kecamatan Muara Pahu dan Mook Manaar
        Bulatn, Kabupaten Kutai Barat, Provinsi Kalimantan Timur. Letak geografis
        objek tanah berada pada titik koordinat 0°18'38.9"S lintang selatan
        116°00'46.4"E bujur timur. Gambaran lokasi objek yang dinilai dapat dilihat
        pada Peta dibawah ini.
             Gambar 1. Peta Identifikasi Lokasi Objek Penilaian Jetty Dermaga




                                           Objek




        Aksesibilitas
        Akses menuju objek yang dinilai kurang lebih dapat di tempuh dari
        Sepinggan International Airport menuju Jalan Iswahyudi kurang lebih 1,2 kilo
        meter sampai bertemu gerbang tol Balikpapan-Samarinda. Kemudian
        dilanjutkan dengan menempuh kurang lebih 100 kilo meter sampai bertemu
        dengan Gerbang Keluar Tol Palaran. Kemudian dilanjutkan dengan
        menempuh kurang lebih 50 kilo meter sampai dengan Tenggarong.
        Kemudian dilanjutkan dengan menempuh kurang lebih 60 kilo meter sampai
        dengan Kota Bangun. Kemudian dilanjutkan dengan menempuh kurang
        lebih 50 kilo meter menggunakan speed boat melewati sungai mahakam
        sampai dengan bertemu Jetty Muara Pahu. Posisi objek berada di sebelah
        kanan sungai.




                                    -8-
Page 26
2.1.5   Data Lingkungan
        Berikut ditampilkan gambar situasi lingkungan sekitar objek penilaian.
                 Gambar 2. Situasi Lingkungan Sekitar Objek Jetty Dermaga




                                        OBJEK




        Batas-batas Tanah Objek
        Wilayah objek penilaian dilengkapi dengan jalan utama yang cukup baik
        dimana jalan dari objek penilaian memiliki lebar jalan ± 6 meter, satu lajur
        dua arah, perkerasan jalan terbuat dari tanah dan batu split melalui
        penimbunan tanah dengan kondisi baik dan terawat.
        Posisi Tanah
        Posisi tanah terletak di pinggir sungai mahakam.
        Kontur Tanah
        Kontur tanah diatas permukaan sungai mahakam di depan lokasi.
        Penggunaan Tanah sekitar
        Lingkungan objek penilaian berada pada lokasi objek vital nasional. Dimana
        penggunaan lokasi objek sebagai akses jetty dan dermaga untuk kegiatan
        loading unloading batubara.

2.1.6   Perizinan
        Peruntukan/zoning objek penilaian adalah sebagai objek vital nasional.

2.1.7   Pemanfaatan Tanah Saat Inspeksi
        Di atas permukaan tanah objek penilaian terdapat bangunan, conveyor
        belt, dan barge loader untuk kegiatan loading unloading batubara.

2.1.8   Penggunaan Tertinggi dan Terbaik (Highest and Best Use, HBU)
        HBU didefinisikan sebagai penggunaan yang paling mungkin dan optimal
        dari suatu aset, yang secara fisik dimungkinkan, telah dipertimbangkan
        secara memadai, secara hukum diijinkan, secara finansial layak dan
        menghasilkan nilai tertinggi dari aset tersebut (KPUP 10.1).
        a.   Karakteristik lokasi Aset merupakan jetty dermaga, dengan fasilitas
             infrastruktur serta tingkat aksesibilitas menuju aset tersebut cukup baik,




                                      -9-
Page 27
              b.   Dari segi peruntukan, penggunaan tanah aset adalah sebagai objek
                   vital nasional,
              c.   Status kepemilikan tanah ini merupakan kepemilikan tunggal dan alas
                   hak tanah berupa Pelepasan Hak atas Tanah dan dapat dipindah
                   tangankan sesuai dengan tujuan penilaian,
              d.   Dari segi luas dan dokumen tanah, peruntukan serta tingkat aksesibilitas
                   yang baik, kami berpendapat bahwa penggunaan tanah saat ini
                   sebagai jetty dan dermaga merupakan penggunaan tertinggi dan
                   terbaik.
              Kami tidak melakukan analisis penggunaan tertinggi dan terbaik secara
              mendetil dan terperinci karena pekerjaan tersebut merupakan pekerjaan
              terpisah dari pekerjaan penilaian ini.

2.2   Objek Bangunan
      Objek bangunan dalam penilaian ini dirincikan sebagai berikut :
      2.2.1   Mess Karyawan Muara Pahu (70 kamar)
              Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
              unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
              pekerjaan bangunan :
              1.   Pekerjaan beton
                   Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
                   wiremesh M-8 satu layer dengan volume 29,04 meter kubik.
              2.   Pekerjaan pasangan
                   Pasangan batako diplester dan diaci dengan volume 160,40 meter
                   kubik. Pasang dinding luar GRC 8mm dan GRC 6mm dengan rangka
                   baja ringan.
              3.   Pekerjaan kusen, pintu, jendela dan ventilasi
                   Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
                   kaca 5mm.
              4.   Pekerjaan atap dan plafon
                   Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 264
                   meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
                   ringan luasan 84 meter persegi. Pasang plafon dalam gypsum akustik
                   9mm dengan rangka baja ringan luasan 160 meter persegi.
              5.   Pekerjaan utilitas listrik
                   Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
                   lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
                   liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
                   MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
                   grounding lengkap stek tembaga panjang 2 meter.
              6.   Pekerjaan utilitas air
                   Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
                   closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
                   panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
                   biofull 1,5 meter kubik.
              7.   Pekerjaan pengecatan
                   Pengecatan cat dinding luar eksterior 324,28 meter persegi, cat dinding
                   dalam eksterior 384,40 meter persegi, cat plafon luar 84 meter persegi,
                   dan cat listplank dengan cat eksterior 68 meter persegi.




                                            - 10 -
Page 28
2.2.2   BUMK Seranai Jaya – Bangun Kantor Muara Pahu
        Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
        unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
        pekerjaan bangunan :
        1.   Pekerjaan pondasi dan lantai
             Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
             kayu ulin, bengkirai dan meranti.
        2.   Pekerjaan pasangan
             Pasangan dinding keramik dengan tinggi 2 meter, rangka baja ringan
        3.   Pekerjaan tiang dan dinding
             Susunan tiang dan dinding, dan rangka dinding terdiri dari kayu ulin,
             meranti, dan GRC.
        4.   Pekerjaan pintu dan jendela
             Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
             5mm.
        5.   Pekerjaan atap dan plafon
             Pasang atap dengan rangka baja ringan luasan 155,34 meter persegi.
             Pasang plafon luar GRC 4mm dengan rangka kanal baja ringan luasan
             41,58 meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
             rangka baja ringan luasan 100 meter persegi.
        6.   Pekerjaan utilitas air
             Closet duduk, jet shower, wastafel, kran wastafel, kran air, floor drain,
             dan septic tank dan peresapan biofull 2 meter kubik.
        7.   Pekerjaan pengecatan
             Pengecatan cat dinding luar eksterior 127,92 meter persegi, cat dinding
             dalam eksterior 218,66 meter persegi.

2.2.3   BUMK Seranai Jaya – Bangun Kantin, Dapur Muara Pahu
        Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
        unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
        pekerjaan bangunan :
        1.   Pekerjaan pondasi dan lantai
             Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
             kayu ulin, bengkirai dan meranti.
        2.   Pekerjaan pasangan
             Pasangan dinding keramik dengan tinggi 2 meter, rangka baja ringan
        3.   Pekerjaan tiang dan dinding
             Susunan tiang dan dinding, dan rangka dinding terdiri dari kayu ulin,
             meranti, dan GRC.
        4.   Pekerjaan pintu dan jendela
             Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
             5mm.
        5.   Pekerjaan atap dan plafon
             Pasang atap dengan rangka baja ringan luasan 309,60 meter persegi.
             Pasang plafon luar GRC 4mm dengan rangka kanal baja ringan luasan
             61,32 meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
             rangka baja ringan luasan 222 meter persegi.




                                     - 11 -
Page 29
        6.   Pekerjaan utilitas air
             Closet duduk, jet shower, wastafel, kran wastafel, kran air, floor drain,
             dan septic tank dan peresapan biofull 2 meter kubik.
        7.   Pekerjaan pengecatan
             Pengecatan cat dinding luar eksterior 168,85 meter persegi, cat dinding
             dalam eksterior 352,82 meter persegi.

2.2.4   Mess Karyawan U1
        Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
        unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
        pekerjaan bangunan :
        1.   Pekerjaan beton
             Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
             wiremesh M-8 satu layer dengan volume 76,56 meter kubik.
        2.   Pekerjaan pasangan
             Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
             Pasang dinding double GRC 6mm dengan rangka baja ringan.
        3.   Pekerjaan kusen, pintu, jendela dan ventilasi
             Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
             kaca 5mm.
        4.   Pekerjaan atap dan plafon
             Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
             meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
             ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
             9mm dengan rangka baja ringan luasan 416 meter persegi.
        5.   Pekerjaan utilitas listrik
             Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
             lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
             liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
             MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
             grounding lengkap stek tembaga panjang 2 meter.
        6.   Pekerjaan utilitas air
             Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
             closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
             panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
             biofull 1,5 meter kubik.
        7.   Pekerjaan pengecatan
             Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
             dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
             dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.5   Mess Karyawan U2
        Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
        unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
        pekerjaan bangunan :
        1.   Pekerjaan beton
             Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
             wiremesh M-8 satu layer dengan volume 76,56 meter kubik.




                                      - 12 -
Page 30
        2.   Pekerjaan pasangan
             Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
             Pasang dinding double GRC 6mm dengan rangka baja ringan.
        3.   Pekerjaan kusen, pintu, jendela dan ventilasi
             Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
             kaca 5mm.
        4.   Pekerjaan atap dan plafon
             Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
             meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
             ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
             9mm dengan rangka baja ringan luasan 416 meter persegi.
        5.   Pekerjaan utilitas listrik
             Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
             lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
             liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
             MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
             grounding lengkap stek tembaga panjang 2 meter.
        6.   Pekerjaan utilitas air
             Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
             closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
             panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
             biofull 1,5 meter kubik.
        7.   Pekerjaan pengecatan
             Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
             dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
             dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.6   Kantin
        Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
        unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
        pekerjaan bangunan :
        1.   Pekerjaan pondasi dan lantai
             Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
             kayu ulin, bengkirai dan meranti.
        2.   Pekerjaan dinding
             Pasangan dinding GRC 6mm dan kayu meranti.
        3.   Pekerjaan pintu dan jendela
             Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
             5mm.
        4.   Pekerjaan atap dan plafon
             Pasang atap spandek 3mm dengan rangka baja ringan luasan 57,50
             meter persegi. Pasang plafon luar GRC 4mm dengan rangka kayu
             luasan 10,50 meter persegi. Pasang plafon dalam gypsum akustik 9mm
             dengan rangka baja ringan luasan 42 meter persegi.
        5.   Pekerjaan utilitas listrik
             Instalasi kabel NYM, lampu TL 18 watt, stop kontak, saklar tunggal dan
             ganda.
        6.   Pekerjaan teras
             Pemasangan tiang kolom, sepatu tongkat, dan lantai papan, dengan
             pasangan atap spandek.



                                      - 13 -
Page 31
        7.   Pekerjaan pengecatan
             Cat dinding luar dengan luasan 37,22 meter persegi, dan dalam
             dengan luasan 56,82 meter persegi.

2.2.7   Mess A
        Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
        unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
        pekerjaan bangunan :
        1.   Pekerjaan struktur pondasi dan lantai
             Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
             kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
             keramik.
        2.   Pekerjaan dinding
             Pasangan dinding GRC 6mm dan rangka kayu meranti dengan luasan
             285 meter persegi.
        3.   Pekerjaan pintu dan jendela
             Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
             5mm.
        4.   Pekerjaan atap dan plafon
             Pasang atap spandek 3mm dengan rangka baja ringan. Pasang plafon
             luar GRC 4mm dengan rangka kayu. Pasang plafon dalam gypsum
             akustik 9mm dengan rangka baja ringan.
        5.   Pekerjaan pengecatan
             Cat dinding luar dengan luasan 222,52 meter persegi, dan dalam
             dengan luasan 549,68 meter persegi.

2.2.8   Mess B
        Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
        unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
        pekerjaan bangunan :
        1.   Pekerjaan struktur pondasi dan lantai
             Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
             kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
             keramik..
        2.   Pekerjaan dinding
             Pasangan dinding GRC 6mm dan rangka kayu meranti dengan luasan
             285 meter persegi.
        3.   Pekerjaan pintu dan jendela
             Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
             5mm.
        4.   Pekerjaan atap dan plafon
             Pasang atap spandek 3mm dengan rangka baja ringan. Pasang plafon
             luar GRC 4mm dengan rangka kayu. Pasang plafon dalam gypsum
             akustik 9mm dengan rangka baja ringan.
        5.   Pekerjaan pengecatan
             Cat dinding luar dengan luasan 222,52 meter persegi, dan dalam
             dengan luasan 549,68 meter persegi.




                                    - 14 -
Page 32
2.2.9    Mess C
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding GRC 6mm dan rangka kayu meranti dengan luasan
              285 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 3mm dengan rangka baja ringan. Pasang plafon
              luar GRC 4mm dengan rangka kayu. Pasang plafon dalam gypsum
              akustik 9mm dengan rangka baja ringan.
         5.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 222,52 meter persegi, dan dalam
              dengan luasan 549,68 meter persegi.

2.2.10   Mess D dan E
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding GRC 6mm dan rangka kayu meranti dengan luasan
              285 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 3mm dengan rangka baja ringan. Pasang plafon
              luar GRC 4mm dengan rangka kayu. Pasang plafon dalam gypsum
              akustik 9mm dengan rangka baja ringan.
         5.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 222,52 meter persegi, dan dalam
              dengan luasan 549,68 meter persegi.




                                     - 15 -
Page 33
2.2.11   Mess U3
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
              wiremesh M-8 satu layer dengan volume 76,56 meter kubik.
         2.   Pekerjaan pasangan
              Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
              Pasang dinding double GRC 6mm dengan rangka baja ringan.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
              kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
              meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
              ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 416 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
              dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
              dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.12   Mess U4
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
              wiremesh M-8 satu layer dengan volume 76,56 meter kubik.
         2.   Pekerjaan pasangan
              Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
              Pasang dinding double GRC 6mm dengan rangka baja ringan.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
              kaca 5mm.




                                       - 16 -
Page 34
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
              meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
              ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 416 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
              dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
              dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.13   Jembatan Walkway 108 meter
         Sarana pelengkap berupa jembatan walkway sepanjang 108 meter. Struktur
         pondasi dan lantai antara lain tongkat, bantalan, gelagar, dan papan
         terbuat dari kayu ulin.

2.2.14   Laundry Camp B – BUMKAM Seranai Jaya
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding GRC 6mm dan rangka bajaringan dengan luasan
              172,34 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 3mm dengan rangka baja ringan. Pasang plafon
              luar GRC 4mm dengan rangka kayu. Pasang plafon dalam gypsum
              akustik 9mm dengan rangka baja ringan.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
              fitting 9 watt, AC split 1 PK, stop kontak, saklar tunggal, saklar ganda, box
              MCB 10 A schneider 1 phase 10 unit.




                                       - 17 -
Page 35
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              instalasi air kotor padat 4 inch, closet duduk, jet shower, kran air, floor
              drain, dan septic tank dan peresapan biofull 1 meter kubik.
         7.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 172,34 meter persegi, dan dalam
              dengan luasan 130,34 meter persegi.

2.2.15   Jembatan Walkway 43 meter
         Sarana pelengkap berupa jembatan walkway sepanjang 43 meter. Struktur
         pondasi dan lantai antara lain tongkat, bantalan, gelagar, dan papan
         terbuat dari kayu ulin.

2.2.16   Rumah Penawasan Settling Pond 1
         Tipe bangunan ini adalah semi permanen. Jumlah lantai pada objek adalah
         1 unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding seng dan rangka kayu dengan luasan 45 meter
              persegi.
         3.   Pekerjaan pintu
              Pintu panel kayu dicat.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 3mm dengan rangka bengkirai dan bubungan.
              Lisplank GRC 8mm lebar 20cm.

2.2.17   Rumah Penawasan Settling Pond 2
         Tipe bangunan ini adalah semi permanen. Jumlah lantai pada objek adalah
         1 unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding seng dan rangka kayu dengan luasan 45 meter
              persegi.
         3.   Pekerjaan pintu
              Pintu panel kayu dicat.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 3mm dengan rangka bengkirai dan bubungan.
              Lisplank GRC 8mm lebar 20cm.




                                        - 18 -
Page 36
2.2.18   Gudang Camp Service dan Maintenance
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin.
         2.   Pekerjaan pasangan
              Pasangan dinding keramik dengan tinggi 2 meter, rangka baja ringan
         3.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari GRC 6mm
              luasan 92 meter persegi dan rangka baja ringan.
         4.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         5.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 202,08
              meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan luasan 168 meter persegi.
         6.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
              fitting 12 watt, AC split 1 PK, stop kontak, exhaust fan, saklar tunggal,
              saklar ganda, box MCB 10 A schneider 1 phase 10 unit.
         7.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3, instalasi air
              kotor padat 6 inch, closet duduk, kran air, floor drain, dan septic tank
              dan peresapan biofull 1 meter kubik.
         8.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 92 meter persegi, cat dinding
              dalam eksterior 111 meter persegi.

2.2.19   Pos Security Camp B
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin.
         2.   Pekerjaan pasangan
              Pasangan dinding keramik dengan tinggi 2 meter, rangka baja ringan
         3.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari GRC 6mm
              luasan 59,77 meter persegi dan rangka baja ringan.
         4.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.




                                        - 19 -
Page 37
         5.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 92,84
              meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan luasan 78 meter persegi.
         6.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
              fitting 12 watt, AC split 1 PK, stop kontak, exhaust fan, saklar tunggal,
              saklar ganda, box MCB 10 A schneider 1 phase 10 unit.
         7.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3, instalasi air
              kotor padat 6 inch, closet jongkok, wastafel dan kran, kran air, floor
              drain, dan septic tank dan peresapan biofull 2 meter kubik.
         8.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 60,51 meter persegi, cat dinding
              dalam eksterior 92,43 meter persegi.

2.2.20   Jembatan Walkway 32 meter
         Sarana pelengkap berupa jembatan walkway sepanjang 32 meter. Struktur
         pondasi dan lantai antara lain tongkat, bantalan, gelagar, dan papan
         terbuat dari kayu ulin.

2.2.21   Rumah Panel Tower Telkomsel
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Pasangan beton terdiri dari cor lantai beton bertulang T=12 cm
              wiremesh M-8 satu layer.
         2.   Pekerjaan pasangan dan dinding
              Pasangan kolom dari kanal baja ringan, dinding double GRC 6mm dan
              rangka baja ringan, lantai dalam keramik.
         3.   Pekerjaan pintu
              Pintu kusen aluminium dan panel kayu.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 23
              meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan luasan 9 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
              fitting 12 watt, AC split 1 PK, stop kontak, exhaust fan, saklar tunggal,
              saklar ganda, box MCB 10 A schneider 1 phase 4 unit dan MCB 100 A
              schneider 3 phase 1 unit.
         6.   Pekerjaan pengecatan
              Pengecatan cat dinding luar 36 meter persegi.

2.2.22   Mess Motorist
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :




                                        - 20 -
Page 38
         1.   Pekerjaan struktur dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin.
         2.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari GRC 6mm
              luasan 125,88 meter persegi dan rangka baja ringan.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 166,28
              meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan luasan 135 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
              fitting 12 watt, AC split 1 PK, stop kontak, exhaust fan, saklar tunggal,
              saklar ganda, box MCB 10 A schneider 1 phase 10 unit.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat 6 inch, closet duduk, jet shower, kran air panas dan
              dingin, floor drain, dan septic tank dan peresapan biofull 2 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 95,74 meter persegi, cat dinding
              dalam eksterior 215,18 meter persegi.

2.2.23   Mess Karyawan U5
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
              wiremesh M-8 satu layer dengan volume 76,56 meter kubik.
         2.   Pekerjaan pasangan
              Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
              Pasang dinding double GRC 6mm dengan rangka baja ringan.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
              kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
              meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
              ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 416 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.




                                        - 21 -
Page 39
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
              dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
              dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.24   Mess Karyawan U6
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
              wiremesh M-8 satu layer dengan volume 76,56 meter kubik.
         2.   Pekerjaan pasangan
              Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
              Pasang dinding double GRC 6mm dengan rangka baja ringan.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
              kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
              meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
              ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 416 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
              dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
              dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.25   Jembatan Walkway 60 meter
         Sarana pelengkap berupa jembatan walkway sepanjang 32 meter. Struktur
         pondasi dan lantai antara lain tongkat, bantalan, gelagar, dan papan
         terbuat dari kayu ulin.




                                       - 22 -
Page 40
2.2.26   Mess Karyawan Putri 60 Unit
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor Concrete lantai bangunan dan rabat K-
              175 tebal 12 cm dengan tulangan wiremesh 8mm, volume 56,61 meter
              kubik.
         2.   Pekerjaan dinding
              Dinding lapisan double GRC 6mm dengan volume 360,36 meter kubik
              dengan kolom rangka baja ringan. Dinding batako T=90 cm dari lantai
              dengan luasan 141 meter persegi, diplester dan diaci.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 514,29
              meter persegi. Pasang plafon GRC 4mm dengan rangka hollow dengan
              luasan 154,29 meter persegi. Pasang plafon dalam gypsum akustik 9mm
              dengan rangka baja ringan luasan 320 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 542,86 meter persegi, cat dinding
              dalam eksterior 1.140 meter persegi, cat plafon luar 154,29 meter
              persegi, dan cat listplank dengan cat eksterior 120 meter persegi.

2.2.27   Kantin non-Staff
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin. Lantai dipasangi keramik dengan luasan 176 meter persegi.
         2.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari GRC 6mm
              luasan 277 meter persegi dan rangka baja ringan.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.




                                       - 23 -
Page 41
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 342,33
              meter persegi. Pasang plafon luar GRC T=4mm dengan rangka baja
              ringan luasan 124 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 165 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
              fitting 11 watt, AC split 1 PK, stop kontak, exhaust fan, saklar tunggal,
              saklar ganda, box MCB 10 A schneider 3 phase.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 4 inch, instalasi
              air kotor padat 4 inch, closet duduk, wastafel, floor drain.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 199,03 meter persegi, cat dinding
              dalam eksterior 262,89 meter persegi.

2.2.28   Power House dan Panel Room
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur beton
              Susunan beton terdiri dari sor lantai dalam bangunan beton bertulang
              T=20cm Include Wiremesh M-8, 2 Layer, begesting dan lapis plastic sheet
              dengan ketebalan 25,20 meter kubik, serta beton bertulang T=10cm
              Include Wiremesh M-8, 1 Layer, begesting dan lapis plastic sheet
              dengan ketebalan 5,40 meter kubik.
         2.   Pekerjaan dinding
              Pemasangan clading spandex merah maroon dan rangka baja ringan
              dengan luas 267 meter persegi, serta pembuatan parit hebel plester aci.
         3.   Pekerjaan pintu
              Pintu besi hollow finishing cat.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan dan
              bubungan. Lisplank GRC 8mm lebar 20cm. Dan pengecatan
              woodplank.

2.2.29   Musholla Camp B – Muara Pahu
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin dan bengkirai.
         2.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari double GRC
              6mm luasan 116,81 meter persegi dan rangka baja ringan.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.




                                        - 24 -
Page 42
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 173,06
              meter persegi. Pasang plafon luar GRC T=4mm dengan rangka baja
              ringan luasan 76,80 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 70 meter persegi.
         5.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 116,81 meter persegi, cat dinding
              dalam eksterior 97,31 meter persegi.

2.2.30   Mess Karyawan U1, U2, U3 total 78 kamar
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
              wiremesh M-8 satu layer dengan volume 76,56 meter kubik.
         2.   Pekerjaan pasangan
              Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
              Pasang dinding double GRC 6mm dengan rangka baja ringan.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
              kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
              meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
              ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 416 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
              dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
              dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.31   Mess Karyawan U4, U5, U6 total 78 kamar
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor lantai beton bertulang T=12 cm dengan
              wiremesh M-8 satu layer dengan volume 76,56 meter kubik.




                                       - 25 -
Page 43
         2.   Pekerjaan pasangan
              Pasangan batako diplester dan diaci dengan volume 804 meter kubik.
              Pasang dinding double GRC 6mm dengan rangka baja ringan.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan ACP serat kayu. Jendela aluminium dan
              kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 698,50
              meter persegi. Pasang plafon luar GRC 6mm dengan rangka kanal baja
              ringan luasan 222 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 416 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 674 meter persegi, cat dinding
              dalam eksterior 1.478 meter persegi, cat plafon luar 222 meter persegi,
              dan cat listplank dengan cat eksterior 138 meter persegi.

2.2.32   Mess tamu 20 unit, rumah laundry, kantin dan dapur, gudang camp service
         dan pos security KM5
         Pos Security
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin.
         2.   Pekerjaan pasangan
              Pasangan dinding keramik dengan tinggi 2 meter, rangka baja ringan
         3.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari GRC 6mm
              luasan 59,77 meter persegi dan rangka baja ringan.
         4.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         5.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 92,84
              meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan luasan 78 meter persegi.




                                       - 26 -
Page 44
6.   Pekerjaan utilitas listrik
     Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
     fitting 12 watt, AC split 1 PK, stop kontak, exhaust fan, saklar tunggal,
     saklar ganda, box MCB 10 A schneider 1 phase 10 unit.
7.   Pekerjaan utilitas air
     Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3, instalasi air
     kotor padat 6 inch, closet jongkok, wastafel dan kran, kran air, floor
     drain, dan septic tank dan peresapan biofull 2 meter kubik.
8.   Pekerjaan pengecatan
     Pengecatan cat dinding luar eksterior 60,51 meter persegi, cat dinding
     dalam eksterior 92,43 meter persegi.

Mess Tamu 20 Unit
Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
pekerjaan bangunan :
1.   Pekerjaan beton
     Susunan beton terdiri dari cor Concrete lantai bangunan dan rabat K-
     175 tebal 12 cm dengan tulangan wiremesh 8mm, volume 56,61 meter
     kubik.
2.   Pekerjaan dinding
     Dinding lapisan double GRC 6mm dengan volume 360,36 meter kubik
     dengan kolom rangka baja ringan. Dinding batako T=90 cm dari lantai
     dengan luasan 141 meter persegi, diplester dan diaci.
3.   Pekerjaan kusen, pintu, jendela dan ventilasi
     Pintu kusen aluminium dan. Jendela aluminium dan kaca 5mm.
4.   Pekerjaan atap dan plafon
     Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 514,29
     meter persegi. Pasang plafon GRC 4mm dengan rangka hollow dengan
     luasan 154,29 meter persegi. Pasang plafon dalam gypsum akustik 9mm
     dengan rangka baja ringan luasan 320 meter persegi.
5.   Pekerjaan utilitas listrik
     Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
     lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
     liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
     MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
     grounding lengkap stek tembaga panjang 2 meter.
6.   Pekerjaan utilitas air
     Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
     closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
     panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
     biofull 1,5 meter kubik.
7.   Pekerjaan pengecatan
     Pengecatan cat dinding luar eksterior 542,86 meter persegi, cat dinding
     dalam eksterior 1.140 meter persegi, cat plafon luar 154,29 meter
     persegi, dan cat listplank dengan cat eksterior 120 meter persegi.

Rumah Laundry
Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
pekerjaan bangunan :




                               - 27 -
Page 45
1.   Pekerjaan struktur pondasi dan lantai
     Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
     kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
     keramik.
2.   Pekerjaan dinding
     Pasangan dinding hebel bata ringan, diplester dan diaci dengan luasan
     104,72 meter persegi.
3.   Pekerjaan pintu dan jendela
     Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
     5mm.
4.   Pekerjaan atap dan plafon
     Pasang atap spandek 0,3mm dengan rangka baja ringan. Pasang
     plafon dalam gypsum akustik 9mm dengan rangka baja ringan.
5.   Pekerjaan utilitas listrik
     Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
     fitting 9 watt, AC split 1 PK, stop kontak, saklar tunggal, saklar ganda, box
     MCB 10 A schneider 1 phase 10 unit.
6.   Pekerjaan utilitas air
     Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
     instalasi air kotor padat 6 inch, closet duduk, jet shower, kran air, floor
     drain, dan septic tank dan peresapan biofull 1 meter kubik.
7.   Pekerjaan pengecatan
     Cat dinding luar dengan luasan 117,87 meter persegi, dan dalam
     dengan luasan 138 meter persegi.

Kantin dan Dapur
Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
pekerjaan bangunan :
1.   Pekerjaan pondasi dan lantai
     Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
     kayu ulin, bengkirai dan meranti.
2.   Pekerjaan pasangan
     Pasangan dinding keramik dengan tinggi 2 meter, rangka baja ringan
3.   Pekerjaan tiang dan dinding
     Susunan tiang dan dinding, dan rangka dinding terdiri dari kayu ulin,
     meranti, dan GRC.
4.   Pekerjaan pintu dan jendela
     Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
     5mm.
5.   Pekerjaan atap dan plafon
     Pasang atap dengan rangka baja ringan luasan 309,60 meter persegi.
     Pasang plafon luar GRC 4mm dengan rangka kanal baja ringan luasan
     61,32 meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
     rangka baja ringan luasan 222 meter persegi.
6.   Pekerjaan utilitas air
     Closet duduk, jet shower, wastafel, kran wastafel, kran air, floor drain,
     dan septic tank dan peresapan biofull 2 meter kubik.
7.   Pekerjaan pengecatan
     Pengecatan cat dinding luar eksterior 168,85 meter persegi, cat dinding
     dalam eksterior 352,82 meter persegi.




                              - 28 -
Page 46
         Gudang CSM
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin.
         2.   Pekerjaan pasangan
              Pasangan dinding keramik dengan tinggi 2 meter, rangka baja ringan
         3.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari GRC 6mm
              luasan 92 meter persegi dan rangka baja ringan.
         4.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         5.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 202,08
              meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan luasan 168 meter persegi.
         6.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL 18 watt, lampu SL dan
              fitting 12 watt, AC split 1 PK, stop kontak, exhaust fan, saklar tunggal,
              saklar ganda, box MCB 10 A schneider 1 phase 10 unit.
         7.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3, instalasi air
              kotor padat 6 inch, closet duduk, kran air, floor drain, dan septic tank
              dan peresapan biofull 1 meter kubik.
         8.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 92 meter persegi, cat dinding
              dalam eksterior 111 meter persegi.

2.2.33   Mess Dept Head 40 unit
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor concrete lantai bangunan dan rabat K-
              175 tebal 12 cm dengan tulangan wiremesh 8mm, volume 56,61 meter
              kubik.
         2.   Pekerjaan dinding
              Dinding lapisan double GRC 6mm dengan volume 360,36 meter kubik
              dengan kolom rangka baja ringan. Dinding batako T=90 cm dari lantai
              dengan luasan 141 meter persegi, diplester dan diaci.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium dan jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 514,29
              meter persegi. Pasang plafon GRC 4mm dengan rangka hollow dengan
              luasan 154,29 meter persegi. Pasang plafon dalam gypsum akustik 9mm
              dengan rangka baja ringan luasan 320 meter persegi.



                                        - 29 -
Page 47
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK, exhaust fan 8 inch, waterheater 10
              liter, stop kontak, saklar tunggal, saklar ganda, box MCB dan perakitan,
              MCB 10 A schneider 1 phase 14 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 1 dan 3 inch,
              closet duduk, jet shower, wastafel, kran wastafel, kran shower untuk air
              panas dan dingin, kran air, floor drain, dan septic tank dan peresapan
              biofull 1,5 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 542,86 meter persegi, cat dinding
              dalam eksterior 1.140 meter persegi, cat plafon luar 154,29 meter
              persegi, dan cat listplank dengan cat eksterior 120 meter persegi.

2.2.34   Masjid KM5
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari cor concrete lantai bangunan dan rabat K-
              175 tebal 12 cm dengan tulangan wiremesh 8mm.
         2.   Pekerjaan pasangan
              Dinding lapisan double GRC 6mm dengan kolom rangka baja ringan.
              Dinding batako T=90 cm dengan lantai keramik, diplester dan diaci.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 318,15
              meter persegi. Pasang plafon GRC 4mm dengan rangka hollow dengan
              luasan 105 meter persegi. Pasang plafon dalam gypsum akustik 9mm
              dengan rangka baja ringan luasan 69,40 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 9 watt,
              lampu fitting 9 watt, AC split 1 PK dan 2 PK, exhaust fan 8 inch, stop
              kontak, saklar tunggal, saklar ganda, box MCB dan perakitan, MCB 10
              A schneider 1 phase 10 unit, MCB 100 A schneider 3 phase 1 unit,
              grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, closet jongkok, kran air, floor drain, dan
              septic tank dan peresapan biofull 1 meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar dan dalam eksterior 58,21 meter persegi,
              cat plafon luar 105 meter persegi, dan cat listplank dengan cat eksterior
              118 meter persegi.




                                        - 30 -
Page 48
2.2.35   Pos PAM OBVITNAS
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding GRC 6mm dan rangka baja ringan dengan luasan
              56,60 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan ACP (Aluminium Composite Panel) dan
              kaca. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan dengan
              luasan 101 meter persegi. Pasang plafon luar GRC 4mm dengan rangka
              baja ringan. Pasang plafon dalam gypsum akustik 9mm dengan rangka
              baja ringan.
         5.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 2 dan 3 inch,
              instalasi air kotor padat 4 inch, closet duduk, jet shower, kran air,
              wastafel, floor drain.
         6.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 78,40 meter persegi, dan dalam
              dengan luasan 53,40 meter persegi.

2.2.36   Control Room Main Office Muara Pahu
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 4
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktural
              Susunan beton terdiri dari cor concrete lantai bangunan dan rabat K-
              1300 dengan tulangan wiremesh 8mm.
         2.   Pekerjaan dinding
              Dinding bata ringan T=10 diplester dan diaci, dilengkapi dengan curtain
              wall. Lantai keramik polish, dicat
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kaca dan kusen aluminium. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 18 watt,
              lampu fitting 9 watt, AC split 2,5 PK, AC standing floor 2 PK, exhaust fan
              8 inch, stop kontak, saklar tunggal, saklar ganda, box MCB dan
              perakitan, MCB 10 A schneider 1 phase 10 unit, MCB 100 A schneider 3
              phase 1 unit, grounding lengkap stek tembaga panjang 2 meter.
         5.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, closet jongkok, kran air, floor drain, dan
              septic tank dan peresapan biofull 5 meter kubik.




                                        - 31 -
Page 49
2.2.37   Pos Security
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding GRC 6mm dan rangka kayu bengkirai dengan luasan
              495,75 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 3mm dengan rangka baja ringan. Pasang plafon
              luar GRC 4mm dengan rangka kayu. Pasang plafon dalam gypsum
              akustik 9mm dengan rangka baja ringan.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 18 watt,
              lampu fitting 12 watt, AC split 1 PK, exhaust fan 8 inch, stop kontak, saklar
              tunggal, saklar gandaMCB 10 A schneider 1 phase 10 unit, grounding
              lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 6 inch, closet jongkok, kran air, floor drain, dan
              septic tank dan peresapan biofull 2 meter kubik.
         7.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 422,40 meter persegi, dan dalam
              dengan luasan 855,75 meter persegi.

2.2.38   Rumah Penawasan Settling Pond Abit
         Tipe bangunan ini adalah semi permanen. Jumlah lantai pada objek adalah
         2 unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding seng dan rangka kayu dengan luasan 45 meter
              persegi.
         3.   Pekerjaan pintu
              Pintu panel kayu dicat.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 3mm dengan rangka bengkirai dan bubungan.
              Lisplank GRC 8mm lebar 20cm.




                                        - 32 -
Page 50
2.2.39   Office Barging CHP
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari beton bertulang T=12cm dengan wiremesh M-
              8 satu layer.
         2.   Pekerjaan pasangan
              Dinding batako T=90 cm dengan lantai keramik, diplester dan diaci.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 130
              meter persegi. Pasang plafon GRC 4mm dengan rangka baja ringan
              dengan luasan 46 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 88 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 8 watt,
              lampu fitting 12 watt, AC split 1 PK, exhaust fan, stop kontak, saklar
              tunggal, saklar ganda, box MCB dan perakitan, MCB 10 A schneider 1
              phase 12 unit, MCB 100 A schneider 3 phase 1 unit, grounding lengkap
              stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, instalasi air hujan pada 4 inch, closet duduk,
              jet shower, kran air, floor drain, dan septic tank dan peresapan biofull 1
              meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 231,35 meter persegi, cat dinding
              dalam 197,75 meter persegi, cat plafon luar 46 meter persegi, dan cat
              listplank dengan cat eksterior 46 meter persegi.

2.2.40   Office QC CHP
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari beton bertulang T=12cm dengan wiremesh M-
              8 satu layer.
         2.   Pekerjaan pasangan
              Dinding batako T=90 cm dengan lantai keramik, diplester dan diaci.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 130
              meter persegi. Pasang plafon GRC 4mm dengan rangka baja ringan
              dengan luasan 46 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 88 meter persegi.




                                        - 33 -
Page 51
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 8 watt,
              lampu fitting 12 watt, AC split 1 PK, exhaust fan, stop kontak, saklar
              tunggal, saklar ganda, box MCB dan perakitan, MCB 10 A schneider 1
              phase 12 unit, MCB 100 A schneider 3 phase 1 unit, grounding lengkap
              stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, instalasi air hujan pada 4 inch, closet duduk,
              jet shower, kran air, floor drain, dan septic tank dan peresapan biofull 1
              meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 231,35 meter persegi, cat dinding
              dalam 197,75 meter persegi, cat plafon luar 46 meter persegi, dan cat
              listplank dengan cat eksterior 46 meter persegi.

2.2.41   Office Buyer dan Surveyor CHP
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Susunan beton terdiri dari beton bertulang T=12cm dengan wiremesh M-
              8 satu layer.
         2.   Pekerjaan pasangan
              Dinding batako T=90 cm dengan lantai keramik, diplester dan diaci.
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kusen aluminium. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 130
              meter persegi. Pasang plafon GRC 4mm dengan rangka baja ringan
              dengan luasan 46 meter persegi. Pasang plafon dalam gypsum akustik
              9mm dengan rangka baja ringan luasan 88 meter persegi.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 8 watt,
              lampu fitting 12 watt, AC split 1 PK, exhaust fan, stop kontak, saklar
              tunggal, saklar ganda, box MCB dan perakitan, MCB 10 A schneider 1
              phase 12 unit, MCB 100 A schneider 3 phase 1 unit, grounding lengkap
              stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, instalasi air hujan pada 4 inch, closet duduk,
              jet shower, kran air, floor drain, dan septic tank dan peresapan biofull 1
              meter kubik.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 231,35 meter persegi, cat dinding
              dalam 197,75 meter persegi, cat plafon luar 46 meter persegi, dan cat
              listplank dengan cat eksterior 46 meter persegi.




                                        - 34 -
Page 52
2.2.42   Kantin dan Dapur Security
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti.
         2.   Pekerjaan pasangan
              Pasangan dinding double GRC 6mm, rangka baja ringan
         3.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari kayu ulin,
              meranti, dan GRC.
         4.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         5.   Pekerjaan atap dan plafon
              Pasang atap dengan rangka baja ringan luasan 240,80 meter persegi.
              Pasang plafon luar GRC 4mm dengan rangka kanal baja ringan luasan
              90,30 meter persegi. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan luasan 123 meter persegi.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 2 inch, instalasi
              air kotor padat PVC 4 inch, kitchen zink 2 bak, kran air, wastafel.
         7.   Pekerjaan pengecatan
              Pengecatan cat dinding luar eksterior 147,36 meter persegi, cat dinding
              dalam eksterior 232,42 meter persegi.


2.2.43   Pos Security Jetty
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin.
         2.   Pekerjaan pasangan
              Pasangan dinding GRC tinggi 2 meter, rangka baja ringan
         3.   Pekerjaan tiang dan dinding
              Susunan tiang dan dinding, dan rangka dinding terdiri dari GRC 8mm
              luasan 16 meter persegi dan rangka baja ringan.
         4.   Pekerjaan pintu dan jendela
              Pintu kusen kayu dan panel kayu. Jendela kayu dan kaca 5mm.
         5.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 16
              meter persegi. List plank GRC 8mm lebar 20cm.




                                        - 35 -
Page 53
2.2.44   Pos PAM OBVITNAS Jetty
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan cor slab k-225 t = 15 cm menggunakan wiremesh m8 1 layer,
              lapis plastiksheet. cor slab lantai selasar k-175 t = 10 cm menggunakan
              wiremesh m8 1 layer, lapis plastiksheet.
         2.   Pekerjaan dinding
              Pasangan dinding double GRC 6mm dan rangka baja ringan dengan
              luasan 77,90 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan ACP dan kaca. Jendela aluminium dan kaca
              5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan dengan
              luasan 144,12 meter persegi. Pasang plafon luar GRC 4mm dengan
              rangka baja ringan. Pasang plafon dalam gypsum akustik 9mm dengan
              rangka baja ringan.
         5.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 2 dan 3 inch,
              instalasi air kotor padat 4 inch connect to biofill, closet duduk, jet shower,
              kran air, wastafel, floor drain. Pemasangan biofill septictank kapasitas 1
              meter kubik. Pembuatan parit keliling dari hebel finish plester dan
              benangan.
         6.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 115,70 meter persegi, dan dalam
              dengan luasan 90,70 meter persegi. Cat plafon luar 92 meter persegi.

2.2.45   Gudang Tawas dan Kapur Abit
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur beton
              Susunan beton terdiri dari sor lantai dalam bangunan beton bertulang
              T=20cm Include Wiremesh M-8, 2 Layer, begesting dan lapis plastic sheet
              dengan ketebalan 25,20 meter kubik, serta beton bertulang T=10cm
              Include Wiremesh M-8, 1 Layer, begesting dan lapis plastic sheet
              dengan ketebalan 5,40 meter kubik.
         2.   Pekerjaan dinding
              Pemasangan clading spandex merah maroon dan rangka baja ringan
              dengan luas 267 meter persegi, serta pembuatan parit hebel plester aci.
         3.   Pekerjaan pintu
              Pintu besi hollow finishing cat.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan dan
              bubungan. Lisplank GRC 8mm lebar 20cm. Dan pengecatan
              woodplank.




                                       - 36 -
Page 54
2.2.46   Mess Karantina 20 Kamar Jetty
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan pondasi terdiri dari tongkat, bantalan, gelagar, dan papan dari
              kayu ulin, bengkirai dan meranti. Lantai papan bawah dipasang
              keramik.
         2.   Pekerjaan dinding
              Pasangan dinding GRC 6mm dan rangka kayu baja ringan dengan
              luasan 495,75 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan panel kayu. Jendela aluminium dan kaca
              5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan. Pasang
              plafon dalam gypsum akustik 9mm dengan rangka baja ringan.
         5.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 8 watt,
              lampu fitting 12 watt, AC split 1 PK, exhaust fan, stop kontak, saklar
              tunggal, saklar ganda, box MCB dan perakitan, MCB 10 A schneider 1
              phase 10 unit, grounding lengkap stek tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 6 inch, closet duduk, jet shower, water heater, kran
              air panas dan dingin, floor drain, wastafel dan kran wastafel, dan septic
              tank dan peresapan biofull 2 meter kubik.
         7.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 422,40 meter persegi, dan dalam
              dengan luasan 855,75 meter persegi.

2.2.47   Extend Kantin Camp C KM 5 Abit
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur pondasi dan lantai
              Susunan cor slab k-225 t = 15 cm menggunakan wiremesh m8 1 layer,
              lapis plastiksheet. cor slab lantai selasar k-175 t = 10 cm menggunakan
              wiremesh m8 1 layer, lapis plastiksheet.
         2.   Pekerjaan dinding
              Pasangan dinding double GRC 6mm dan rangka baja ringan dengan
              luasan 249,50 meter persegi.
         3.   Pekerjaan pintu dan jendela
              Pintu kusen aluminium dan UPVC. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan dengan
              luasan 190 meter persegi. Pasang plafon luar GRC 4mm dengan rangka
              baja ringan. Pasang plafon dalam gypsum akustik 9mm dengan rangka
              baja ringan.




                                        - 37 -
Page 55
         5.   Pekerjaan utilitas air
              Instalasi air bersih PVC ¾ inch, instalasi air kotor PVC 2 dan 4 inch, instalasi
              air kotor padat 4 inch connect to biofill, closet duduk, jet shower, kran
              air, wastafel, floor drain. Pemasangan biofill septictank kapasitas 1 meter
              kubik. Pembuatan parit keliling dari hebel finish plester dan benangan.
         6.   Pekerjaan pengecatan
              Cat dinding luar dengan luasan 249,50 meter persegi, dan dalam
              dengan luasan 228,50 meter persegi. Cat plafon luar 107 meter persegi.

2.2.48   Sport Hall
         Sarana sporthall meliputi pembuatan lapangan bulu tangkis dan futsal,
         lapangan tenis dan basket, pekerjaan atap dan cladding, dan pekerjaan
         mekanikal, elektrikal, serta plumbing (MEP).

2.2.49   Rumah Server Telkomsel T0
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan beton
              Pasangan beton terdiri dari cor lantai beton bertulang T=10 concrete K-
              250 cm wiremesh M-6 satu layer.
         2.   Pekerjaan pasangan dan dinding
              Pasangan kolom dari kanal baja ringan, dinding hebel dan dinding GRC
              6mm dan GRC 4mmdan rangka baja ringan, lantai dalam keramik.
         3.   Pekerjaan pintu
              Pintu kusen aluminium dan panel kayu. Pintu besi kupu-kupu
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan luasan 11,72
              meter persegi. Pasang plafon dalam GRC dalam dan luar 9mm dengan
              rangka baja ringan luasan 9 meter persegi.
         5.   Pekerjaan utilitas listrik
              lampu TL LED NVC 36 watt, lampu SL LED fitting 9 watt, AC split 1 PK,
              exhaust fan, stop kontak, saklar tunggal, saklar ganda, box MCB dan
              perakitan, MCB 10 A schneider 1 phase 10 unit, grounding lengkap stek
              tembaga panjang 2 meter.
         6.   Pekerjaan utilitas air
              Instalasi instalasi air kotor PVC 4, dan 3, dan ½ inch, closet duduk, krain
              air, floor drain, wastafel dan kran wastafel, dan septic tank dan
              peresapan biofull 1,2 meter kubik.
         7.   Pekerjaan pagar
              Pagar dari tiang ulin di cor, rel pintu geser.

2.2.50   Warehouse CHP 3 Unit
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 1
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktur beton
              Susunan beton terdiri dari sor lantai dalam bangunan beton bertulang
              concrete K-200 dengan kolom baja ringan, pengecoran T=20 cm K-300
              wiremesh M10 dua layer



                                        - 38 -
Page 56
         2.   Pekerjaan dinding
              Pemasangan clading spandex dan rangka baja ringan dengan luas 283
              meter persegi, serta pembuatan parit hebel plester aci.
         3.   Pekerjaan pintu
              Pintu besi hollow finishing cat.
         4.   Pekerjaan atap dan plafon
              Pasang atap spandek 0,3mm dengan rangka baja ringan dengan
              luasan 196 meter persegi. Lisplank GRC 8mm lebar 20cm dan
              pengecatan woodplank.

2.2.51   Bayan Mart
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 4
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktural
              Susunan beton terdiri dari cor concrete lantai bangunan dan rabat K-
              1300 dengan tulangan wiremesh 8mm.
         2.   Pekerjaan dinding
              Dinding bata ringan T=10 diplester dan diaci, dilengkapi dengan curtain
              wall. Lantai keramik polish, dicat
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kaca dan kusen aluminium. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 18 watt,
              lampu fitting 9 watt, AC split 2,5 PK, AC standing floor 2 PK, exhaust fan
              8 inch, stop kontak, saklar tunggal, saklar ganda, box MCB dan
              perakitan, MCB 10 A schneider 1 phase 10 unit, MCB 100 A schneider 3
              phase 1 unit, grounding lengkap stek tembaga panjang 2 meter.
         5.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, closet jongkok, kran air, floor drain, dan
              septic tank dan peresapan biofull 5 meter kubik.

2.2.52   Control Room Jetty Muara Pahu
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 4
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktural
              Susunan beton terdiri dari cor concrete lantai bangunan dan rabat K-
              1300 dengan tulangan wiremesh 8mm.
         2.   Pekerjaan dinding
              Dinding bata ringan T=10 diplester dan diaci, dilengkapi dengan curtain
              wall. Lantai keramik polish, dicat
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kaca dan kusen aluminium. Jendela aluminium dan kaca 5mm.




                                        - 39 -
Page 57
         4.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 18 watt,
              lampu fitting 9 watt, AC split 2,5 PK, AC standing floor 2 PK, exhaust fan
              8 inch, stop kontak, saklar tunggal, saklar ganda, box MCB dan
              perakitan, MCB 10 A schneider 1 phase 10 unit, MCB 100 A schneider 3
              phase 1 unit, grounding lengkap stek tembaga panjang 2 meter.
         5.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, closet jongkok, kran air, floor drain, dan
              septic tank dan peresapan biofull 5 meter kubik.

2.2.53   Coal Lab
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 4
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktural
              Susunan beton terdiri dari cor concrete lantai bangunan dan rabat K-
              1300 dengan tulangan wiremesh 8mm.
         2.   Pekerjaan dinding
              Dinding bata ringan T=10 diplester dan diaci, dilengkapi dengan curtain
              wall. Lantai keramik polish, dicat
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kaca dan kusen aluminium. Jendela aluminium dan kaca 5mm.
         4.   Pekerjaan utilitas listrik
              Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 18 watt,
              lampu fitting 9 watt, AC split 2,5 PK, AC standing floor 2 PK, exhaust fan
              8 inch, stop kontak, saklar tunggal, saklar ganda, box MCB dan
              perakitan, MCB 10 A schneider 1 phase 10 unit, MCB 100 A schneider 3
              phase 1 unit, grounding lengkap stek tembaga panjang 2 meter.
         5.   Pekerjaan utilitas air
              Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
              air kotor padat PVC 4 inch, closet jongkok, kran air, floor drain, dan
              septic tank dan peresapan biofull 5 meter kubik.

2.2.54   Side Dump Office
         Tipe bangunan ini adalah permanen. Jumlah lantai pada objek adalah 4
         unit. Tahun dibangun sekitar tahun 2023. Berikut ditampilkan uraian
         pekerjaan bangunan :
         1.   Pekerjaan struktural
              Susunan beton terdiri dari cor concrete lantai bangunan dan rabat K-
              1300 dengan tulangan wiremesh 8mm.
         2.   Pekerjaan dinding
              Dinding bata ringan T=10 diplester dan diaci, dilengkapi dengan curtain
              wall. Lantai keramik polish, dicat
         3.   Pekerjaan kusen, pintu, jendela dan ventilasi
              Pintu kaca dan kusen aluminium. Jendela aluminium dan kaca 5mm.




                                        - 40 -
Page 58
               4.   Pekerjaan utilitas listrik
                    Instalasi listrik meliputi kabel eterna NYM , lampu TL LED NVC 18 watt,
                    lampu fitting 9 watt, AC split 2,5 PK, AC standing floor 2 PK, exhaust fan
                    8 inch, stop kontak, saklar tunggal, saklar ganda, box MCB dan
                    perakitan, MCB 10 A schneider 1 phase 10 unit, MCB 100 A schneider 3
                    phase 1 unit, grounding lengkap stek tembaga panjang 2 meter.
               5.   Pekerjaan utilitas air
                    Instalasi air bersih PVC ½ dan 1 inch, instalasi air kotor PVC 3 inch, instalasi
                    air kotor padat PVC 4 inch, closet jongkok, kran air, floor drain, dan
                    septic tank dan peresapan biofull 5 meter kubik.

2.3   Objek Sarana Jetty Dermaga
      Objek sarana jetty dan dermaga muara pahu terdiri dari pekerjaan sipil dan konveyor.
      Berikut ditampilkan deskripsi instalasi jetty line 1 2 dan 3.
      A. Pendahuluan
         Pekerjaan pendahuluan yang dimaksud meliputi project management,
         supervision and preliminaries items, transportasi pengiriman material, dan desain
         engineering.
      B. Pekerjaan Sipil
         Pekerjaan sipil yang dimaksud meliputi persiapan site berupa material supply dan
         persiapan tanah yaitu excavation, transport, speading, grading and compaction.
         Konstruksi pekerjaan tiang pancang.
      C. Pekerjaan Konveyor
         Pekerjaan konveyor meliputi perakitan konveyor, struktural, mekanikal, fuel tank,
         fuel jetty, head stock, dan access road.

2.4   Objek Infrastruktur
      Objek infrastruktur muara pahu yang dimaksud terdiri dari fuel tank KM 0 Muara Pahu
      kapasitas 2500KL satu unit, dan fuel tank KM 6 Muara Pahu kapasitas 2500KL dua unit.
      Serta fasilitas access road KM8 hauling road.

2.5   Objek Mesin dan Peralatan
      Objek penilaian yaitu berupa Mesin Loading Unloading batubara berupa Conveyor
      3 Line, Crusher Side Dump 3 Line, Weight Bridge 3 Line yang menjadi satu kesatuan
      yang tak terpisahkan dalam melakukan operasi Loading Unloadingnya dengan
      kapasitas 60 Kilo Ton – 80 Kilo Ton perhari untuk saat ini, dengan perhitungan per jam
      4000 Ton serta panjang bentangan Conveyor 8 Km. Setiap line dilengkapai magnet
      penangkap logam dan panel control tiap stasiun sebagai pengawas mesin berjalan.
      Line loading Unloading dibantu oleh peralatan pendukung penerangan dan pompa
      anti banjir untuk setiap lokasi yang dianggap rawan banjir dengan Generator Set
      berbagai daya kapasitas sesuai kondisi dan Dewatering Pump Multiflow serta
      Compressor Lighting. Kendaraan Alat Berat dan Mesin (Heavy Equipment Vehicles
      and Machinery) serta Spare part cadangan untuk mengatasi jika terjadi sesuatu di
      lapangan bisa secepatnya di perbaiki agar tidak menghambat operasional Loading
      Unloading. Dimana aset hak kepemilikannya dari nilai perolehan dan transaksi
      berupa invoice, lokasi aset berada di Kecamatan Muara Pahu, Kabupaten Kutai
      Barat, Kalimantan Timur – Indonesia.
      Objek penilaian yang dimaksud berupa Mesin dan Peralatan Pendukungnya,
      Kendaraan dan Alat Berat untuk semua keperluan operasional Loading dan
      Unloading pada saat inspeksi aset tersebut beroperasi secara normal dan berada di
      area tambang batu bara. Berikut ditampilkan daftar objek mesin dan peralatan
      sebagai berikut :



                                              - 41 -
Page 59
                                 Tabel 1. Mesin dan Peralatan
No.                                Mesin dan Peralatan                            Jumlah
                                                                                   (Unit)
  1   Crusher Side Dump 1 KM 6                                                              2
  2   Crusher Side Dump 2 KM 6                                                              2
  3   Crusher Side Dump 3 KM 6                                                              1
  4   Weight Bridge Muara Pahu                                                              1
  5   Weight Bridge Muara Pahu                                                              1
  6   Weight Bridge Muara Pahu                                                              1
  7   POWER GENERATOR 15KVA 12KW SILENT, Genset SN : S202001010 + S202001002 +              5
      F16E2011446 + F16E2011447 + WR164D + FLD1909619
  8   POWER GENERATOR SET 13.5KVA-SILENT TYPE, PG2209003501 - PG2209003520              20
  9   POWER GENERATOR SET 150KVA SILENT TYPE - PERKINS                                      1
 10   ATLAS COPCO AIR COMPRESSOR PORTABLE                                                   1
 11   POWER GENERATOR SET CATERPILAR C15 500KVA - SILENT TYPE                               2
 12   POWER GENERATOR 2000KVA 400V/50Hz(DG/3516B) (JCH00288 + JCH00300 +                    9
      JCH00301 + JCH00302 + JCH00303 + JCH00304 + JCH00305 + JCH00306 +
      JCH00307)
 13   TRAKINDO UTAMA, PT-TRAKINDO U, GENSET SN LXJ0973 INV.                                 1
 14   TRAKINDO UTAMA, PT-TRAKINDO U, GENSET SN LXJ0974 INV.                                 1
 15   POWER GENERATOR 2000KVA 400V/50Hz(DG/3516B) (TRAKINDO) (S/N :                         5
      JCH00294;JCH00297;JCH00299;JCH00295;JCH00298)
 16   POWER GENERATOR 2000KVA 400V/50Hz(DG/3516B) (TRAKINDO) (S/N : JCH00286;               4
      JCH00287;JCH00289; JCH00296)
 17   GENSET SILENT PERKINS 13.5 KVA, Genset SN : S202001032 & S202001034                   2
 18   ATLAS COPCO AIR COMPRESSOR 12 BAR/175 PSI SN : WUX666714                              1
 19   GENSET VOLVO TAD734GE-250KVA, Generator SN : X16J435615 & X16L521614                  2
 20   ATLAS COPCO B6 + LIGHTNING TOWER (SN : ESF 208054 + 208055 + 208319 +                 4
      208320)
 21   DIESEL GENERATOR ASSY ( KRISBOW )                                                     1
 22   PORTABLE AIR COMPRESSOR 7 BAR (Part No. MIS-ELGI-PG185-100)                           1
 23   DIESEL GENERATOR ASSY ( KRISBOW )                                                     3
 24   ATLAS COPCO B6 + LIGHTNING TOWER                                                      6
 25   ATLAS COPCO AIR COMPRESSOR PORTABLE SN : WUP200143                                    1
 26   DEWATERING PUMP MULTIFLOW CF45LV + P6T PONTOON                                        1
 27   DEWATERING PUMP MULTIFLOW CF 45LV + PONTOON 6 TON                                     1
 28   GENERATOR D4000W 1PH SILENT KRPD40                                                    3
 29   POWER GENERATOR 80KVA 1104A-44TG2 - PERKINS                                           3
 30   ATLAS COPCO B6 + LIGHTNING TOWER                                                      2
 31   MIG WELDING INVERTER-MILLER                                                           4
 32   FAWDE POWER GENSET 20KVA SILENT TYPE 4DW91-23D                                        6
 33   OIL INJECTED AIR COMPRESSOR + AIR DRYER + PRE FILTER + AFTER FILTER + AIR             1
      RECEIVER TANK 1000L GDK22-10 SN : 2472762
 34   FAWDE POWER GENSET 40KVA SILENT TYPE, Generator SN : SPG23060038 &                    2
      SL202402014
 35   FAWDE POWER GENERATOR 20KVA-SILENT TYPE, Generator SN : K24161601 +                   2
      K24161602




                                          - 42 -
Page 60
2.6   Objek Alat Berat dan Kendaran
      Berikut ditampilkan daftar objek alat berat dan kendaraan sebagai berikut :
                                   Tabel 2. Alat Berat dan Kendaraan
       No.                            Alat Berat dan Kendaraan                    Jumlah
                                                                                   (Unit)
         1   EXCAVATOR CATERPILLAR 320NG AMPHIBIOUS SLR S/N : YBP10811                      1
         2   EXCAVATOR CATERPILLAR 320NG AMPHIBIOUS SLR S/N : ZBN30422                      1
         3   BASE MACHINE, SWAMP SHOE, STRAIGHU TILT DOZER S/N : 66037                      1
         4   BASE MACHINE, SWAMP SHOE, STRAIGHU TILT DOZER S/N : 66037                      1
         5   XCMG EXCAVATOR XE215C S/N : XUGF215BKMKA04342                                  1
         6   XCMG EXCAVATOR XE215C S/N : XUGF215BPMKA04386                                  1
         7   XCMG EXCAVATOR XE215C S/N : XUGF215BVMKA04281                                  1
         8   XCMG EXCAVATOR XE215CLL S/N : XUGA215LAMKA00217 (LONG ARM)                     1
         9   XCMG EXCAVATOR XE215CLL S/N : XUGA215LAMKA00218 (LONG ARM)                     1
        10   XCMG EXCAVATOR XE215CLL S/N : XUGA215LLMKA00219 (LONG ARM)                     1
        11   XCMG EXCAVATOR XE490DK S/N : XUGA490ALKA03460                                  1
        12   SWAMP EXCAVATOR XCMG XE215SLL S/N : XUGA215LHNKA00210                          1
        13   BULL DOZER D85E SS-2 S/N : J19538                                              1
        14   DUMP TRUCK 20 M3 MERCEDES BENZ AXOR 2528C 6X4 S/N : MFJ 400 243 NJ             1
             000621
        15   DUMP TRUCK 20 M3 MERCEDES BENZ AXOR 2528C 6X4 S/N : MFJ 400 243 NJ             1
             000685
        16   BULL DOZER D85E SS-2 S/N : J19639                                              1
        17   BULL DOZER D85E SS-2 S/N : J19640                                              1
        18   FUEL TRUCK VOLVO FMX-400 6X6-25KL S/N : YV2XS02E1NA300087                      1
        19   WATER TRUCK VOLVO FMX-400 6X4-30KL S/N : YV2XSG0D7NB374045                     1
        20   ARTICULATED DUMP TRUCK VOLVO A40G S/N : VCEOA40GL00324491                      1
        21   ARTICULATED DUMP TRUCK VOLVO A40G S/N : VCEOA40GE00324479                      1
        22   BULLDOZER SHANTUI DH24B2-LGP S/N: CHSDH24HHNB000325                            1
        23   MOTOR GRADER GD825 S/N: 13442                                                  1
        24   COMPACTOR BOMAG BW220-D5 S/N: 961587611077                                     1
        25   COMPACTOR BOMAG BW220-D5 S/N: 961587611078                                     1
        26   TELEHANDLER MANITOU MHU-X 790 S/N : MAN00000V01074258                          1
        27   BULLDOZER CATERPILLAR D8T COAL BLADE S/N: JJ501813                             1
        28   ROUGH TERRAN CRANE ZOOMLION ZRT850V S/N : ZRT850-0171                          1
        29   BULL DOZER KOMATSU D375A 6R COAL BLADE S/N: 66056                              1
        30   BULL DOZER KOMATSU D375A 6R COAL BLADE S/N: 66060                              1
        31   CRANE TRUCK VOLVO HYVAA8T FMX440 6X6 S/N : YV2XS0EXPA318302                    1
        32   LOW BED 80T SCANIA R620-A 6X4 S/N : YS2R6X400N5673671                          1
        33   WHEEL LOADER WA980 S/N : CAT00980AMK900695                                     1
        34   FORKLIFT 3.5T S/N: CT14E-85955                                                 1
        35   MANHAUL 50 SEAT VOLVO FMX 440 6X6 S/N: 2244520                                 1
        36   FUEL TRUCK 40KL VOLVO FMX-440 8X4 Engine No: 2237532                           1
        37   WATER TRUCK 40KL VOLVO FMX-440 8X4 Engine No:2237131 S/N :                     1
             YV2XS02G3PA316800
        38   CARGO TRUCK PS135 C/W AIR CONDITIONER S/N: MHMFE75EKPK009558                   1
        39   CHEMICAL TRUCK HINO FM260 WITH PUMP-10T S/N : MJEFM8JN2NJX15325                1
        40   WATER TRUCK 40KL VOLVO FMX-440 8X4 S/N : YV2XS02G4PA316885                     1
        41   BULLDOZER CAT D8T C/W COAL BLADE S/N: JJ800586                                 1
        42   BULLDOZER CAT D10T C/W COAL BLADE S/N: CAT0D10TLRAB01514                       1




                                                 - 43 -
Page 61
           43   SMALL CRANE TRUCK HYVA HB60E2-COMP SINGLE CABIN S/N :                   1
                MHMFE74EHPK001903
           44   SMALL CRANE TRUCK HYVA HB60E2-COMP DOUBLE CABIN S/N :                   2
                MHMFE74EHPK001556 & MHMFE74EHPK001293
           45   MANITOU MTX1840-TELEHANDLE S/N : MNA00000A01105431                      1
           46   MITSUBISHI FUSO FE 74 HD GARBAGE TRUCK C/W ARM ROL + CONTAINER ARM      1
                ROLL TERTUTUP S/N : MJECCB2F7P5014531
           47   MANITOU MRT-X2545-TELEHANDLE S/N : MAN00000J01117297                    1
           48   MOBIL SCANIA 410-6X4 CRANE TRUCK 10T HYVA S/N : YS2P6X400P9322427       1
           49   MIXER TRUCK 7M³-MITSUBISHI FN62F 6X4                                    1
           50   FORKLIFT DP-100NH CATERPILLAR                                           1
           51   BOOM LIFT ZT34J ZOOMLION                                                1
           52   MECHANICAL TRUCK 260 PS SC KNUCKLE CRANE 5T + COMPRESSOR No. Rangka :   1
                MJEFG8JP2RJP11360
           53   SCANIA WASHING TRUCK 40KL G460-8X4 ACC                                  1
           54   HYDRAULIC EXCAVATOR 345GC-CATERPILAR                                    1


2.7   Objek Construction in Progress
      Objek konstruksi Construction In Progress yang dimaksud adalah persiapan
      pembangunan line 3A jetty muara pahu.

2.8   Objek Construction In Progress
      Objek konstruksi Construction In Progress yang dimaksud adalah pembangunan
      bangunan baru muara pahu, meliputi :

      1.    Mess Staf 20 Kamar Jetty Muara Pahu
      2.    Gudang Quality Control & Barging Muara Pahu
      3.    Mess Expat Muara Pahu
      4.    Pos Security Main Office Muara Pahu
      5.    Mess Non Staf 15 Barak Kap. @ 10 Kamar
      6.    Gereja Muara Pahu
      7.    Gudang Tps Lb3 Muara Pahu
      8.    Klinik Muara Pahu
      9.    Rumah Ipal Muara Pahu
      Per tanggal 16 Juni 2025, mess staff dan rumah ipal muara pahu sudah berdiri,
      sedangkan sisanya masih dalam tahapan belanja material.

2.9   Objek Sparepart
      Objek penilaian yang dimaksud berupa Sparepart cadangan untuk semua keperluan
      operasional Loading dan Unloading pada saat inspeksi aset tersebut beroperasi
      secara normal dan berada di area tambang batu bara. Daftar sparepart dapat
      dilihat dalam lampiran.




                                                   - 44 -
Page 62
                                        BAB III
                                     DATA PASAR


3.1   Pertumbuhan Ekonomi Global
      Pertumbuhan ekonomi global pada 2024 diprakirakan melambat menjadi 3,2%
      dari 3,3% pada 2023 dan diproyeksikan tetap 3,2% pada 2025, serta melambat
      lebih lanjut menjadi 3,1% pada 2026. Divergensi pola pertumbuhan antarnegara
      juga berlanjut seiring dengan meningkatnya fragmentasi ekonomi dan
      perdagangan global. Ekonomi AS diprakirakan tetap kuat pada 2024 dan 2025
      disertai dengan risiko pemanasan ekonomi yang berasal dari pembengkakan
      defisit fiskal. Sementara itu, pertumbuhan ekonomi Tiongkok dan Kawasan Eropa
      diprakirakan akan melanjutkan perlambatan seiring dengan lemahnya
      permintaan domestik dan dampak dari kebijakan tarif dagang yang diterapkan
      oleh Pemerintah AS.
      Pertumbuhan ekonomi India, Indonesia, dan sejumlah negara Emerging Market
      Economies (EMEs) masih cukup baik, didukung oleh permintaan domestik di
      tengah kendala ekspor karena perlambatan ekonomi dan fragmentasi
      perdagangan global. Inflasi dunia menurun dari 6,2% pada 2023 ke 5,2% pada
      2024, namun diprakirakan masih tetap tinggi pada 2025 dan 2026, masing-masing
      4,5% dan 4,2%, dengan kemungkinan terjadinya perang dagang antara AS
      dengan sejumlah mitra dagang utamanya, serta terganggunya mata rantai pasok
      perdagangan dunia.
      Di sisi lain, prospek pertumbuhan ekonomi India, Indonesia, serta sejumlah negara
      Emerging Market Economies (EMEs) diprakirakan masih tetap positif, didorong oleh
      permintaan domestik, meskipun menghadapi potensi perlambatan ekspor akibat
      penurunan pertumbuhan ekonomi global dan fragmentasi perdagangan dunia.
      Ke depan, perekonomian global diprakirakan akan menghadapi tantangan yang
      makin kompleks dengan lima kecenderungan utama yang perlu diantisipasi
      melalui kebijakan ekonomi nasional yang optimal. Pertama, meningkatnya risiko
      geopolitik dan berlanjutnya fragmentasi perdagangan global. Kedua, pergeseran
      dalam pola pertumbuhan ekonomi global. Ketiga, tingginya suku bunga dan risiko
      utang Pemerintah. Keempat, ketidakpastian yang berlanjut serta perubahan
      dalam pola investasi keuangan global. Kelima, percepatan digitalisasi
      antarnegara dan peningkatan risiko operasional, khususnya yang terkait dengan
      keamanan siber.
                            Tabel 3. Tingkat Perekonomian Dunia
                 Wilayah               2022       2023       2024      2025*     2026*
       Dunia                            3,5        3,3        3,2       3,2       3,1
       Negara Maju                      2,6        1,7       1,8        1,8       1,8
       Amerika Serikat                  1,9        2,9       2,8        2,4       2,3
       Kawasan Eropa                    3,4        0,4       0,8        1,1       1,3
       Jepang                           1,0        1,9       -0,1       1,2       0,5
       Negara Berkembang                4,1        4,4        4,1       4,0       3,9
       Tiongkok                         3,0        5,2        4,8       4,4       3,8
       India                            6,8        7,7        6,6       6,6       6,7
       Asean 5                          5,5        4,0        4,8       4,7       4,6
       Amerika Latin                    4,2        2,2        2,1       2,4       2,6




                                         - 45 -
Page 63
3.2   Pertumbuhan Ekonomi Indonesia
      Pertumbuhan ekonomi Indonesia pada 2024 dan 2025 diprakirakan berada dalam
      kisaran 4,7–5,5%, dan diprakirakan akan meningkat pada 2026 dalam kisaran 4,8-
      5,6%. Proyeksi pertumbuhan yang lebih tinggi ini didorong oleh berbagai upaya,
      baik dari sisi permintaan maupun penawaran.
      Proses pemulihan ekonomi Indonesia terus berlanjut pada 2024 dengan
      pertumbuhan yang diprakirakan tetap baik pada 2025 dan meningkat pada 2026.
      Pertumbuhan ekonomi hingga triwulan III-2024 cukup baik didukung oleh
      permintaan domestik, meskipun melambat dari 5,11% pada triwulan I 2024 menjadi
      5,05% pada triwulan II-2024 dan 4,95% pada triwulan III-2024. Investasi tetap
      membaik, khususnya investasi bangunan sejalan dengan penyelesaian berbagai
      PSN. Konsumsi rumah tangga, khususnya kelas menengah ke atas, tetap terjaga.
      Ekspor nonmigas tumbuh relatif tinggi di tengah perlambatan ekonomi global dan
      penurunan harga komoditas. Sementara itu, impor meningkat baik untuk
      kebutuhan ekspor maupun permintaan domestik, dan karenanya menyebabkan
      penurunan pertumbuhan ekonomi. Pada triwulan IV 2024, pertumbuhan ekonomi
      diprakirakan tetap baik ditopang terutama oleh kenaikan investasi dan terjaganya
      konsumsi.
               Tabel 4. Indikator Makro Ekonomi Nasional Tahun 2021 – 2025
              Indikator             Unit       2021            2022            2023          2024             2025*
       Pertumbuhan Ekonomi      % (yoy)          5,03          5,01            5,05         4,7-5,5           4,7-5,5
       Inflasi                  % (yoy)          1,87          5,51            2,61         2,5±1%           2,5±1%
       Nilai Tukar Rata-rata    Rp/USD      14.311,96     14.870,61       15.255,00         15.847     15.900-16.100
       Suku Bunga - BI Rate        %             3,50          5,50             6,0            6,25              6,25
      Sumber : Bank Indonesia

            Tabel 5. Pertumbuhan Ekonomi Indonesia - Sisi Pengeluaran (%,yoy)
                  Komponen                    2022             2023            2024           2025*        2026*
       Konsumsi Rumah Tangga                   5,31            5,05            4,7-5,5       4,7-5,5       4,8-5,6
       Konsumsi Lembaga NonProfit
                                               4,94            4,93            4,8-5,6       4,5-5,3       4,8-5,6
       Melayani Rumah Tangga
       Konsumsi Pemerintah                    -4,47             2,95           6,3-7,1       4,5-5,3       3,7-4,5
       Investasi (PMTDB)                       3,87             4,40           4,5-5,3       4,4-5,2       4,8-5,6
       Ekspor                                 16,23             1,32           5,4-6,2       4,4-5,2       5,4-6,2
       Impor                                  15,00            -1,65           6,5-7,3       5,1-5,9       5,8-6,6
      Sumber : Bank Indonesia

            Tabel 6. Pertumbuhan PDB Domestik Berdasarkan Lapangan Usaha (&yoy)
                    Komponen                          2022             2023         2024          2025          2026
       Pertanian, Kehutanan dan perikanan               5,31            5,05      4,7-5,5        4,7-5,5       4,8-5,6
       Pertambahan dan Penggalian                       2,33            1,27      0,3-1,1        4,2-5,0       5,0-5,8
       Industri Pengolahan                              4,38            6,09      4,4-5,2        4,2-5,0       5,3-6,1
       Pengadaan Listrik dan Gas                        4,89            4,64      4,1-4,9        4,2-5,0       4,3-5,1
       Pengadaan Air, Pengelolaan Sampah,               6,68            4,89      4,7-5,5        2,4-3,2       4,0-4,8
       Limbah dan Daur Ulang
       Konstruksi                                       3,23            4,91      1,5-2,3        3,8-4,6       4,4-5,2
       Perdagangan Besar dan Eceran;                    2,02            4,90      7,1-7,9        5,9-6,7       6,3-7,1
       Reparasi Mobil dan Sepeda Motor
       Transportasi dan Pergudangan                    5,53             4,85      4,3-5,1        4,1-4,9      4,5-5,3
       Penyediaan Akomodasi dan Makan                 19,96            14,07      8,6-9,4        8,9-9,7    10,2-11,0
       Minum
       Informasi dan Komunikasi                       11,98            10,07      8,1-8,9        5,6-6,4      5,8-6,6
       Jasa Keuangan dan Asuransi                      7,72             7,60      7,1-7,9        7,8-8,6    10,3-11,1
       Real Estat                                      1,94             4,78      6,1-6,9        6,6-7,4      7,1-7,9
       Jasa Perusahaan                                 1,74             1,43      2,0-2,8        1,7-2,5      2,9-3,7




                                               - 46 -
Page 64
                    Komponen                       2022    2023     2024       2025      2026
       Administrasi Pemerintahan, Pertahanan        8,77    8,24   8,6-9,4    7,0-7,8   5,6-6,4
       dan Jaminan Sosial Wajib                     2,85    1,41   8,1-8,9   -1,7-0,9   4,0-4,8
       Jasa Pendidikan                              0,59    1,75   3,9-4,7    3,5-4,3   7,2-8,0
       Jasa Kesehatan dan Kegiatan Sosial           2,95    4,76   7,7-8,5    4,4-5,2   4,6-5,4
       Jasa Lainnya                                 9,44   10,52   7,6-8,4    5,0-5,8   6,5-7,3
      Sumber : Bank Indonesia

3.3   Inflasi
      Rapat Dewan Gubernur (RDG) Bank Indonesia pada 22-23 April 2025 memutuskan
      untuk mempertahankan BI-Rate sebesar 5,75%, suku bunga Deposit
      Facility sebesar 5,00%, dan suku bunga Lending Facility sebesar 6,50%. Keputusan
      ini konsisten dengan upaya menjaga prakiraan inflasi 2025 dan 2026 tetap
      terkendali dalam sasaran 2,5±1%,
      Inflasi Indeks Harga Konsumen (IHK) pada Maret 2025 mengalami inflasi sebesar
      1,03% (yoy) dengan inflasi tetap terkendali sebesar 2,48% (yoy) sejalan dengan
      konsistensi suku bunga kebijakan BI (BI Rate) untuk mengarahkan ekspektasi inflasi.
      Inflasi kelompok volatile food (VF) tercatat sebesar 0,37% (yoy) didukung oleh
      kecukupan pasokan komoditas pangan utama dan eratnya sinergi pengendalian
      inflasi oleh Tim Pengendalian Inflasi Pusat/Daerah (TPIP/TPID) melalui Gerakan
      Nasional Pengendalian Inflasi Pangan (GNPIP). Bank Indonesia memastikan bahwa
      inflasi terkendali dalam sasaran 2,5 ±1% pada 2025 dan 2026.
      Pemerintah dan Bank Indonesia sepakat untuk memperkuat sinergi dan koordinasi
      guna mengendalikan inflasi Indeks Harga Konsumen (IHK) agar tetap dalam
      kisaran sasaran 2,5±1% pada 2025. Penguatan sinergi kebijakan antara Pemerintah
      dan Bank Indonesia merupakan lanjutan keberhasilan pencapaian pada 2024
      sehingga inflasi IHK 2024 terjaga dalam kisaran sasaran 2,5±1%.
                             Grafik 1. Inflasi IHK dan Komponen Inflasi




                     Sumber : Bank Indonesia

3.4   Nilai Tukar Rupiah
      Nilai tukar Rupiah tetap stabil dan cenderung menguat didukung kebijakan
      stabilisasi Bank Indonesia dan ketidakpastian pasar keuangan global yang sedikit
      mereda. Nilai tukar Rupiah terhadap Dollar          AS per Mei 2025 menguat
      dibandingkan posisi April 2025 sebesar 1,13% (ptp). Rupiah juga menguat
      dibandingkan mata uang negara berkembang mitra dagang utama Indonesia
      dan kelompok mata uang negara maju diluar Dollar AS.
      Penguatan mata uang dolar AS secara luas tersebut menimbulkan tekanan
      pelemahan pada seluruh mata uang dunia, tidak terkecuali Rupiah. Nilai tukar




                                               - 47 -
Page 65
      Rupiah yang pada akhir tahun 2023 berada pada sekitar15.500 per dolar AS,
      melemah hingga sekitar16.328 pada Juni 2024, kemudian menguat ke
      sekitar15.319 pada September 2024, dan kembali tertekan karena gejolak global
      tersebut ke sekitar16.102 per dolar AS pada Spot NDF 1M DNDF 1M DXY (Skala
      Kanan) akhir Desember 2024.
      Nilai tukar Rupiah diprakirakan stabil didukung komitmen Bank Indonesia dalam
      menjaga stabilitas nilai tukar Rupiah, imbal hasil yang menarik, inflasi yang rendah,
      dan prospek pertumbuhan ekonomi Indonesia yang tetap baik. Bank Indonesia
      terus memperkuat respons kebijakan stabilisasi, termasuk intervensi terukur di
      pasar off-shore         Non-Deliverable   Forward (NDF)       dan         strategi triple
      intervention pada transaksi spot, Domestic Non-Deliverable Forward (DNDF), dan
      SBN di pasar sekunder. Seluruh instrumen moneter juga terus dioptimalkan,
      termasuk penguatan strategi operasi moneter pro-market melalui optimalisasi
      instrumen Sekuritas Rupiah Bank Indonesia (SRBI), Sekuritas Valas Bank Indonesia
      (SVBI), dan Sukuk Valas Bank Indonesia (SUVBI), untuk memperkuat efektivitas
      kebijakan dalam menarik aliran masuk investasi portofolio asing dan mendukung
      stabilitas nilai tukar Rupiah.
                   Grafik 2. Perkembangan Nilai Tukar Rupiah 2024 dan 2023




3.5   Suku Bunga BI-Rate
      Rapat Dewan Gubernur (RDG) Bank Indonesia pada 19-20 Juni 2024 memutuskan
      untuk mempertahankan BI-Rate sebesar 6,25%, suku bunga Deposit Facility sebesar
      5,50%, dan suku bunga Lending Facility sebesar 7,00%. Keputusan ini konsisten
      dengan kebijakan moneter pro-stability sebagai langkah preemptive dan forward
      looking untuk memastikan inflasi tetap terkendali dalam sasaran 2,5±1% pada 2024
      dan 2025. Kebijakan ini didukung dengan penguatan operasi moneter untuk
      memperkuat efektivitas stabilisasi nilai tukar Rupiah dan masuknya aliran modal
      asing. Sementara itu, kebijakan makroprudensial dan sistem pembayaran tetap
      pro-growth untuk mendukung pertumbuhan ekonomi yang berkelanjutan.

3.6   Perkembangan Investasi
      Realisasi investasi periode tahun 2024 sebesar1,71 triliun atau meningkat 20,80%
      dibandingkan dengan tahun sebelumnya yang mencapai1,42 triliun. Target
      investasi tahun 2024 adalah sebesar 1,65 triliun dengan realisasi yang melebihi
      target sebesar 103,88%. Dibandingkan 2 tahun sebelumnya, tahun 2024 realisasi
      investasi PMDN (Penanaman Modal Dalam Negeri) lebih besar dibandingkan
      dengan realisasi investasi PMA (Penanaman Modal Asing).




                                            - 48 -
Page 66
      Nilai investasi PMA sepanjang Tahun 2024 mencapai814 triliun atau sebesar 47,49%
      dan PMDN mencapai900 triliun atau sebesar 52,51%. Dibandingkan tahun 2023,
      PMA mencapai744,0 triliun atau 52,43% dan PMDN mencapai674,90 triliun atau
      47,57%.

              Grafik 3. Perkembangan Realisasi Investasi Tahun 2019 - 2024 (Rp Triliun)




3.7   Tinjauan Umum Industri Batubara
      3.7.1       Proyeksi Bauran Energi di Indonesia
                  Berikut ditampilkan Grafik yang menunjukkan proyeksi bauran energi di
                  Indonesia tahun 2021 sampai dengan 2030.
                          Grafik 4. Proyeksi Bauran Energi di Indonesia Tahun 2021 - 2030

                                 300

                                 250

                                 200                                         Batubara
                                                                             Gas
                      Ribu GWh




                                                                             BBM
                                 150                                         Air
                                                                             Panas bumi
                                                                             EBT lain
                                 100

                                 50

                                  0
                                       2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

                  Menurut Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2021-2030,
                  bauran energi di Indonesia tetap akan didominasi batubara pada 2030.
                  Bauran batubara mencapai 59,4% jika mengikuti skenario karbon rendah.
                  Melihat dari kapasitasnya, pembangkitan listrik batubara nasional
                  diproyeksikan terus bertambah dari 2021 hingga 2030. Nilainya meningkat
                  dari 194.558 GigaWatt hours (GWh) pada 2021 menjadi 264.260 GWh
                  pada 2030. Pembangkitan listrik bahan bakar minyak (BBM) menjadi satu-
                  satunya sumber energi yang akan dikurangi, dengan target
                  pengurangan dari 10.222 GWh pada 2021 menjadi 1.798 GWh pada 2030.




                                                   - 49 -
Page 67
        Energi Baru dan terbarukan (EBT) energi air diproyeksikan meningkat
        kapasitasnya dari 16.867 GWh pada 2021 menjadi 42.516 GWh pada
        2030. Lalu, panas bumi diproyeksikan meningkat dari 16.954 GWh menjadi
        36.485 GWh. Sementara itu, EBT lainnya diproyeksikan meningkat dari
        2.766 GWh pada 2021 menjadi 27.353 GWh pada 2030. Bauran EBT
        diproyeksikan mencakup 23,9% total pembangkitan energi pada 2030.

3.7.2   Sumberdaya dan Cadangan Batubara di Indonesia
        Indonesia merupakan salah satu negara yang mempunyai cadangan
        batubara terbesar di dunia. Per Desember 2023, cadangan batubara di
        Indonesia mencapai total 31,71 miliar ton. Batubara di Indonesia masih
        menjadi andalan sumber energi terutama untuk pembangkit listrik dan
        sebagian untuk sektor industri. Dengan demikian, seluruh penyediaan
        batubara dipenuhi dari produksi dalam negeri, kecuali beberapa jenis
        batubara berkalori tinggi yang diperlukan untuk memenuhi kebutuhan
        industry baja. Potensi sumberdaya batubara di Indonesia masih cukup
        besar hingga beberapa puluh tahun ke depan. Potensi batubara di
        Indonesia adalah batubara kalori sangat tinggi (>7100 kal/g), kalori tinggi
        (6100-7100 kal/gram), kalori sedang (5100-6100 kal/gram) dan kalori
        rendah (<5100 kal/gram). Potensi wilayah untuk cadangan batubara
        berkalori sangat tinggi terdapat di Provinsi Sumatera Barat, Provinsi
        Kalimantan Tengah dan Provinsi Papua Barat. Berikut peta persebaran
        cadangan batubara kalori sangat tinggi di Indonesia :
            Gambar 3. Persebaran Cadangan Batubara Kalori Sangat Tinggi
                             (>7100kal/g) di Indonesia




3.7.3   Produksi dan Ekspor Batubara
        Produksi batubara selama 5 (lima) tahun terakhir, 2020 sampai dengan
        2024 mengalami kenaikan rata-rata 10,37% per tahun. Dari sisi ekspor,
        pertumbuhan ekspor Batubara Indonesia rata-rata mengalami kenaikan
        sebesar 8,21% per tahun sedangkan konsumsi domestik batubara
        mengalami kenaikan rata-rata 17,80% per tahun walaupun di tahun 2023
        sempat mengalami penurunan sebesar 1,36% tetapi di tahun 2024
        kembali mengalami kenaikan sebesar 9,46%. Berikut ditampilkan tingkat
        kenaikan produksi batubara, ekspor, dan kebutuhan domestik untuk
        pembangkit listrik (Domestic Market Obligation/DMO) di Indonesia dari
        tahun 2020 - 2024.




                                   - 50 -
Page 68
              Grafik 5. Tingkat Produksi dan Penjualan Batubara di Indonesia
              900.000
              800.000
              700.000
              600.000

   RIBU TON   500.000
              400.000
              300.000
              200.000
              100.000
                       0
                            2020         2021              2022              2023             2024
              Produksi     563.728      613.990        687.432              775.182          836.000
              Ekspor       405.053      435.217        465.336              518.046          555.000
              Domestik     131.887      133.043        215.813              212.868          233.000
              Impor         8.756       14.469         12.493               14.458           48.000


Pada tahun 2023, produksi batubara Indonesia mencapai 775,18 juta ton
atau mengalami peningkatan sebesar 12,76% dibandingkan tahun 2022.
Pada tahun 2024, Indonesia tercatat mengekspor batu baranya
sebanyak 405,76 juta ton atau meningkat sebesar 6,86% dibandingkan
dengan jumlah ekspor tahun 2023 yang tercatat mencapai 379,71 juta
ton. Tiga negara terbesar tujuan ekspor batu bara Indonesia adalah India
yang menempati posisi pertama, diikuti oleh Tiongkok, dan yang ketiga
adalah Filipina.
Menduduki posisi pertama India menikmati batu bara dari Indonesia
sebanyak 108,07 juta ton di 2024. Angka tersebut tercatat menurun 0,79%
bila dibandingkan dengan tahun sebelumnya, Indonesia mengekspor
batu bara ke India tahun 2023 sebesar 108,93 juta ton. Negara kedua
tujuan ekspor batu bara Indonesia adalah Tiongkok. Sepanjang tahun
2024, China menikmati sebanyak 93,16 juta ton atau meningkat 14,06%
dibandingkan dengan jumlah ekspor ke Tiongkok tahun 2023 yang
tercatat mencapai 81,68 juta ton. Posisi ketiga adalah Filipina dengan
jumlah sebanyak 38,94 juta ton atau meningkat hingga 7,82%
dibandingkan dengan tahun sebelumnya sebesar 36,11 juta ton. Berikut
ditampilkan Tabel Negara Destinasi Ekspor Batubara Indonesia dari tahun
2020 – 2024.
  Tabel 7. Negara Tujuan Ekspor Batubara Indonesia (dalam Juta Ton)
                                                                  Tahun
              Negara Tujuan
                                     2020         2021             2022         2023          2024
       India                           98.2         70.8            110.2        108,9         108,1
       Tiongkok                        62.5        108.5             69.7             81,7        93,2
       Jepang                          27.0         23.0             26.4             25,3        28,9
       Korea Selatan                   24.8         21.0             25.8             25,3        26,3
       Taiwan                          17.6         16.3             18.2             15,1        15,3
       Malaysia                        26.7         25.5             25.2             28,1        27,2
       Philipina                       28.1         30.1             30.9             36,1        38,9
       Thailand                        16.6         15.2             15.3             11,9        13,8
       Hongkong                         3.9          5.3              5.2              4,9            4,9
       Spanyol                          0.0          0.1              0.2                -              -
       Lainnya                         36.2         29.8             33.0            42,32        49,2
       Total                          341.5        345.5            360.1           379,7       405,8




                                        - 51 -
Page 69
                     Grafik 6. Negara Tujuan Ekspor Batubara Indonesia 2024




3.7.4       Konsumsi Domestik Batubara
            Konsumsi batubara selama 5 (lima) tahun terakhir, 2020 sampai dengan
            2024 masih berfluktuasi. Tahun 2023, konsumsi batubara domestik
            mencapai 212,87 juta ton atau mengalami penurunan sebesar 1,36%
            dibandingkan konsumsi tahun 2022 yang mencapai 215,81 juta ton. Pada
            tahun 2024, konsumsi batubara domestik mencapai 232,60 juta ton atau
            mengalami kenaikan sebesar 9,27% dibandingkan tahun 2023. Angka ini
            merupakan realisasi kewajiban pemenuhan kebutuhan batubara untuk
            kepentingan dalam negeri, dan melebihi target DMO tahun 2024 yang
            ditetapkan sebesar 220 juta ton. Berikut ini ditampilkan konsumsi domestik
            batubara dari tahun 2020 sampai dengan 2024 dalam Juta ton.
                          Tabel 8. Konsumsi Domestik Batubara per Industri
                                                                  Tahun
                          2020                2021                 2022               2023               2024*
    Jenis Industri
                      Juta        %       Juta        %       Juta       %       Juta       %       Juta       %
                       ton                 ton                 ton                ton                ton
    Pembangkit       104.83      79.48   112.13      84.28   129.23     59.88   121,19     56,94   132,44     56,94
    Listrik
    Industri Besi,    13.21      10.02    11.39       8.56    49.38    22.88     60,11    28,24     65,69    28,24
    Baja, dan
    Metalurgi
    Semen,             6.51       4.94     4.68       3.52    13.11     6.08      9,81     4,61     10,72     4,61
    Tekstil,
    Pupuk
    Pulp dan           2.00       1.52     1.12       0.84     6.30     2.92      5,38     2,53      5,88     2,53
    Kertas
    Briket             0.05       0.04     0.00       0.00     0.00     0.00      0,98     0,00      0,98     0,00
    Lainnya            5.28       4.00     3.72       2.80    17.80     8.25     16,37     7,69     17,89     7,69
    Total            131.89   100.00     112.13   100.00     215.81   100.00    212,87   100.00    232,60   100.00
   Sumber : Kementerian ESDM, 2023 (diolah) *) data diolah

            Berdasarkan Renstra ESDM 2020 sampai dengan 2024, target permintaan
            energi tahun 2050 masih akan didominasi oleh sektor industri dan
            transportasi sebagaimana kondisi pada tahun 2019. Peningkatan aktivitas
            industri dan aktivitas kendaraan bermotor memberikan kontribusi yang
            cukup besar pada peningkatan permintaan energi di kedua sektor
            tersebut. Permintaan di sektor industri diproyeksikan sejalan dengan
            proyeksi pertumbuhan industri pada “Visi Indonesia 2045” sedangkan
            permintaan energi di sektor transportasi dipengaruhi oleh pertumbuhan




                                              - 52 -
Page 70
        kendaraan bermotor, program substitusi kendaraan konvensional (BBM)
        ke kendaraan listrik, program mandatory biodiesel dan bioetanol serta
        beralihnya kendaraan pribadi ke kendaraan masal.

3.7.5   Harga Batubara Acuan
        Harga Batubara Acuan (HBA) untuk penjualan batubara untuk periode
        kedua bulan Juni 2025 pada titik serah penjualan secara Free on Board di
        atas kapal pengangkut (FOB Vessel) adalah 98,61/Ton. HBA periode
        kedua bulan Juni 2025 yang tertuang dalam Keputusan Menteri Energi
        dan Sumber Daya Mineral (Kepmen ESDM) No. 209.K/MB.01/MEM.B/2025
        turun sebesar 2,36 atau turun 2,34% dibandingkan dengan HBA periode
        pertama Juni 2025 sebesar 100,97.
        Bila dibandingkan dengan HBA bulan yang sama pada tahun 2024 yaitu,
        HBA Juni 2024 123 (year on year), maka HBA periode kedua Juni 2025
        turun signifikan sebesar 24,39 atau turun 19,83%. HBA periode kedua Juni
        2025 digunakan sebagai dasar perhitungan Harga Patokan Batubara
        (HPB) untuk periode kedua Juni 2025 untuk batubara dengan kalori lebih
        besar dari 6.000 kcal/kg GAR.
                          Grafik 7. Rata-rata Harga Batubara Acuan (HBA)

                                        Harga Batubara USD/MT (Ribu)
                                         2022     2023       2024   2025

             350,00


             300,00            305,21
                                                                                  281,48

             250,00


             200,00

                               158,50
             150,00                                                              122,51
                      124,01
                                                                           114,43 117,38
             100,00                                  99,79
                        125,85

              50,00


                 -




3.7.6   Aktivitas Penunjang Pertambangan dan Penggalian Lainnya
        Menurut BPS (KBLI2020), kelompok Aktivitas Penunjang Pertambangan
        dan Penggalian Lainnya mencakup jasa penunjang atas dasar balas jasa
        atau kontrak, yang dibutuhkan dalam kegiatan pertambangan
        golongan 05 batubara dan lignit, 06 minyak bumi dan gas alam dan
        panas bumi, 07 bijih logam, dan 08 pertambangan dan penggalian
        lainnya. Aktivitas penunjang pertambangan batubara memiliki IUJP (Izin
        Usaha Jasa Pertambangan) yang mmenunjukkan kompetensi usaha
        sesuai klasifikasi, kualifikasi, tenaga kerja dan peralatan yang dimiliki.
        Klasifikasi pekerjaan yang akan dijalankan di sektor pertambangan
        batubara antara lain :
        A.      Konsultasi, perencanaan, pelaksanaan dan pengujian peralatan
                dibidang:
                a.    Penyelidikan Umum;




                                         - 53 -
Page 71
       b.     Eksplorasi;
       c.     Studi kelayakan;
       d.     Konstruksi Pertambangan;
       e.     Pengangkutan;
       f.     Lingkungan Pertambangan;
       g.     Pasca tambang dan Reklamasi; dan/atau
       h.     Keselamatan dan Kesehatan Kerja
B.     Konsultasi, perencanaan, dan pengujian peralatan di bidang:
       a.     Penambangan; atau
       b.     Pengolahan dan Pemurnian

Berikut ditunjukkan klasifikasi pelaksanaan aktivitas penunjang batubara :
                  Tabel 9. Klasifikasi Aktivitas Penunjang Batubara
 No.              Bidang                          Sub-bidang
     1.     Penyelidikan Umum    1. Survey Tinjau (Reconnaissance)
                                 2. Remote sensing
                                 3. Prospeksi
     2.     Eksplorasi           1. Manajemen Eksplorasi
                                 2. Penentuan Posisi
                                 3. Pemetaan Topografi
                                 4. Pemetaan Geologi
                                 5. Geokimia
                                 6. Geofisika
                                 7. Survei Bawah Permukaan
                                 8. Geoteknik
                                 9. Pemboran Eksplorasi
                                 10. Percontohan Eksplorasi
                                 11. Perhitungan Sumber Daya dan Cadangan
     3.     Studi Kelayakan      1. Penyusunan dokumen lingkungan
                                 2. Penyusunan Studi Kelayakan
     4.     Konstruksi           1. Penerowongan (Tunneling)
            Pertambangan         2. Penyemenan Tambang Bawah Tanah
                                 3. Penyanggaan Tambang Bawah Tanah
                                 4. Shaft Sinking
                                 5. Sistem Penerangan Tambang Bawah Tanah
                                 6. Alat Gali, Muat, dan Angkut Tambang Bawah
                                 Tanah
                                 7. Pemboran dan Peledakan
                                 8. Fasilitas Perbengkelan
                                 9. Komisioning Tambang
                                 10. Ventilasi Tambang
                                 11. Fasilitas Pengolahan
                                 12. Fasilitas Pemurnian
                                 13. Jalan Tambang
                                 14. Jalan Angkut
                                 15. Jembatan
                                 16. Pelabuhan
                                 17. Gudang Bahan Peledak
                                 18. Fasilitas Penimbunan Bahan Bakar Cair
                                 19. Sistem Penyaliran
                                 20. Tempat Penyimpanan Sementara Limbah
                                 Bahan Berbahaya dan Beracun (B3)
                                 21. Kolam Pengendap




                                - 54 -
Page 72
                                         22. Tailing Storage Facility (TSF)
                                         23. Geoteknik
                 5.   Pengangkutan       1. Menggunakan Truk
                                         2. Menggunakan Lori
                                         3. Menggunakan Ban Berjalan (belt conveyor)
                                         4. Menggunakan Tongkang
                                         5. Menggunakan Pipa
                                         6. Menggunakan Lift
                 6.   Lingkungan         1. Pemantauan Lingkungan
                      Pertambangan       2. Survei RKL/RPL
                                         3. Pengelolaan Air Asam Tambang
                                         4. Audit Lingkungan Pertambangan
                                         5. Pengendalian Erosi
                 7.   Pasca    Tambang   1. Pembongkaran Fasilitas
                      dan Reklamasi      2. Penyiapan dan Penataan Lahan
                                         3. Penebaran Tanah Pucuk
                                         4. Pembibitan
                                         5. Penanaman
                                         6. Perawatan
                 8.   Keselamatan dan    1. Pemeriksaan dan Pengujian Teknik
                      Kesehatan Kerja    2. Audit Keselamatan dan Kesehatan Kerja
                                         Pertambangan
                 9.   Penambangan        1. Pembukaan lahan
                                         2. Pemberaian/ Pembongkaran Tanah / Batuan
                                         Penutup dengan didahului peledakan
                                         3. Pemberaian/ Pembongkaran Tanah/ Batuan
                                         Penutup tanpa didahului peledakan
                                         4. Pengupasan, pemuatan dan pemindahan
                                         tanah/batuan penutup
                                         5. Penggalian Mineral (mineral getting)
                                         6. Penggalian Batubara (coal getting)
                                         7. Penggalian pemindahan dan/atau pencucian
                                         endapan mineral aluvial dalam rangka program
                                         kemitraan



3.8   Tinjauan Umum Kendaraan dan Alat Berat
      3.8.1   Pasar untuk Kendaraan Alat Berat
              Ukuran pasar peralatan konstruksi berat bernilai 206,24 miliar pada
              tahun2022 industri peralatan industri berat diproyeksikan tumbuh dari
              219,76 miliar pada tahun 2023 menjadi 321,41 miliar pada tahun 2030,
              menunjukan pertumbuhan tahunan gabungan (CAGR) sebesar 5,77%
              selama periode perkiraan (2023 – 2030). Untuk operasi berat tugas seperti
              penanganan material, penggalian, pengangkatan dan operasi berat
              lainnya peralatan atau mesin konstruksi berat digunakan.Pasar peralatan
              konstruksi berat didorong oleh sektor komersial perumahan dan industri
              serta perluasan kemitraan pabrik -swasta dan ekspansi ekonomi di seluruh
              dunia. Meskipun terdapat banyak jenis alat berat konstruksi yang tersedia
              namun memilih alat yang tepat sangatlah penting .Perusahaan
              mempertimbangkan material kualitas kompleksitas proyek dan
              keselamatan saat memilih peralatan konstruksi berat.




                                         - 55 -
Page 73
            Grafik 8. Permintaan Pasar Kendaraan dan Alat Konstruksi Berat




        Bagi perusahaan kontraktor konstruksi menyewa atau menyewakan
        peralatan konstruksi berat merupankan hal menguntungkan karena
        dapat memenuhi kebutuhan klien akan peraltan tersebut tanpa
        menimbulkan seluruh biaya. Salah satu keuntungan dari menyewa atau
        menyewakan adalah hal itu dapat dilakukan berdasarkan preferensi
        pengguna      kebutuhan    peralatan     dan   pendapatan     yang
        diharapkan.Keputusan untuk menyewa atau menyewakan alat
        kontrucksi berat dipengaruhi oleh banyak variabel termasuk jangka
        waktu penggunaan aset. Kemajuan teknologi selama itu dan
        keuntungan pajakyang terkait dengan penywaan dan penyewaan
        peralatan tersebut. Alasan alasan ini yang membuat menyewa lebih
        hemat biaya bagi kontraktor dibandingkan membeli kecuali peralatan
        tersebut dapat diguanakan lebih dari 75% dalam setahun. Kontraktor
        yang menyewa juga dapat mengakses lebih banyak variasi peralatan
        sambal memanfaatkan teknologi muktahir. Hasilnya hal ini memberikan
        kesempatan kepada pelaku pasar alat konstruksi berat untuk
        menggunakan peralatan tersebut tanpa harus membayar langsung.

3.8.2   Segmentasi Pasar Kendaraan Alat Berat
        Wawasan Jenis Peralatan Konstruksi Berat
        Segmentasi pasar berdasarkan jenis peralatan meliputi peralatan
        pemindahan tanah, peralatan penanganan material. Kendaraan
        Konstruksi berat dan lainnya segmen peralatan penanganan material
        memegang saham mayoritas pada tahun 2022, berkontribusi terhadap
        pendapatan peralatan konstruksi berat global. Karena peningkatan
        jumlah Gedung bertingkat tinggi menggunakan berbagai peralatan
        penanganan material seperti dozer creane telescopic handler, forklift.
        Wawasan Aplikasi Alat Konstruksi Berat
        Berdasarkan aplikasi segmentasi pasarnya meliputi penggalian dan
        pembongkaran pengangkatan berat pembuatan terowongan
        penanganan material daur ulang dan pengelolaan limbah.Segmen
        penggalian dan pembongkaran mendominasi segmen pasar ini
        mencakup peralatan seperti eksavator, Buldozer dan peralatan
        pembongkaran yang digunakan untuk menggali, meratakan dan
        membuang puing-puing dari lokasi Konstruksi. Permintaan peralatan
        penggalian dan pembongkaran didorong oleh berbagai faktor seperti




                                  - 56 -
Page 74
        pertumbuhan   industri   Konstruksi    meningkatnya    permintaan
        pembangunan infrastuktur dan kebutuhan akan operasi penggalian dan
        pembongkarn yang efisien dan aman.
        Wawasan Pengguna Akhir Peralatan Konstruksi Berat
        Berdasarkan pengguna akhir segmentasi pasarnya meliputi infrasTrucktur
        Konstruksi pertambangan minyak dan gas manufaktur dan lainnya
        segmen infrastruktur merupakan segmen pasar terbesar industri
        infrastruktur sering menggunakan peralatan Konstruksi tugas berat
        sehingga segmen pasar ini akan menduduki peringkat teratas ditahun
        tahun mendatang.Kebutuhan akan sistem transportasi mutakhir semakin
        meningkat karena laju urbanisasi yang semakin cepat. Industri infrastuktur
        global akan berkembang secara signifikan ditahun tahun mendatang
        ketika pemerintah mengembangkan rencana baru untuk memenuhi
        permintaan ini terutama datang dari Tiongkok dan India.
            Grafik 9. Pasar Alat Konstruksi Berat Berdasarkan Jenis Peralatan




        Wawasan Regional Alat Konstruksi Berat
        Berdasarkan wilayan studi ini memberikan wawasan pasar tentang
        Amerika, Eropa, Asia Pasifik dan seluruh dunia. Pasar Asia Pasifik akan
        tumbuh pada CAGR tercepat karena pesatnya perkembangan ekonomi
        berbagai negara dikawasan ini. Konstransi besar perusahaan perusahaan
        kaya dikawasan ini dan kecendrungan mereka untuk memanfaatkan
        teknologi mutakhir akan mempercepat laju perkembangan pasar
        regional. Jalan Raya Nasional adalah dua inisiatif yang dilakukan
        pemerintah Tiongkok untuk meningkatkan infrastruktur transportasi
        negaranya. Hasilnya infrastruktur kereta api di negara ini kan tumbuh
        paling cepat. Perekonomian negara berkembang pesat dan aktivitas
        pembangunan komersial meningkat secara signifikan dalam pemanasan
        global.

3.8.3   Pemain Pasar Utama Alat Konstruksi Berat
        Pelaku pasar besar menghabiskan banyak uang untuk penelitian dan
        pengembangan guna meningkatkan liniproduk mereka yang akan
        membantu pasar tumbuh lebih besar lagi.Pelaku pasar juga mengambil
        berbagai inisiatif strategis untuk mengembangkan jejak mereka di
        seluruh dunia dengan pengembangan pasar utama seperti peluncuran
        produk baru perjanjian kontrak merger dan akuisisi peningkatan investasi
        dan kolaborasi dengan organisasi lain. Pesaing di industri peralatan




                                   - 57 -
Page 75
              Konstruksi berat harus menawarkan barang barang yang hemat biaya
              untuk berkembang dan bertahan dalam lingkungan pasar yang semakin
              kompetitif dan meningkat.
              Memproduksi secara lokal untuk memangkas biaya operasional adalah
              salah satu taktik bisnis utama yang digunakan produsen dalam industry
              peraltan Konstruksi berat global untuk menguntungkan pelanggan dan
              memperluas sektor pasar. Pelaku pasar utama termasuk Hitachi
              Machinary Contruction CNH, Liebher, Caterpilar Inc, Hyundai Heavy
              Industri dan lainnya berupaya meningkatkan permintaan pasar dengan
              mendanai inisiatif penelitian dan pengembangan.
              Produsen peralatan Konstruksi international adalah Hitachi Construction
              Machinary perusahaan ini memproduksi berbagai jenis barang termasuk
              eskavator hidrolik, whell loader, Truck sampah kaku, peralatan Konstruksi
              jalan dan mesin kerja berlengan ganda.Perusahaan menawarkan fleet
              management system dengan pemantauan real-time terhadap setiap
              dump truck Autonomous Haulage System (AHS) yang memungkinkan
              pengoperasian dump truck pertambangan secara otonom dan tanpa
              awak serta solusi Konstruksi ICT yang mendukung seluruh proses teknologi
              informasi dan komunikasi (ICT) operasi Konstruksi mulai dari survey
              Konstruksi awal hingga pengiriman data bawaan dan consite sebuah
              teknologi yang melacak status mesin.Bersama dengan peralatan baru
              dan bekas layanan penyewaan suku cadang yang diproduksi ulang
              pemeliharaan dan dukungan teknis.Hitachi Construction Machinary juga
              menjual barang barang termasuk filter hidrolik dan selang bertekanan
              tinggi.
              CNH industrial bekerja dipasar barang modal bekerja pada
              perancangan pembuatan pemanasan penjualan dan pembiayaan
              Truck, bus, kendaraan komersial dan kendaraan khusus untuk pemdaman
              kebakaran pertahanan dan perlindungan sipil serta peralatan pertanian
              dan Konstruksi. Bisnis ini juga berspesialisasi dalam aplikasi maritime dan
              pembangkit listrik untuk mesin, girboks dan gandar. CNH bergerak dalam
              operasi bisnis disektor Pertanian, Konstruksi, Kendaraan Komersial dan
              Khusus Powertrain dan Jasa Keuangan.
              Daftar Perusahaan Utama Di Pasar Peralatan Konstruksi Berat Meliputi :
              •   Konstruksi mesin hitachi
              •   CNH
              •   Liebherr
              •   Caterpillar
              •   Industri Berat Hyundai
              •   Infracoe Doosen
              •   Mesin Konstruksi Kobelco
              •   Jhon Deere
              •   Komatsu
              •   JCB

3.9   Tinjauan Pasar Properti Komersial
      Indeks demand properti komersial untuk kategori sewa pada triwulan I 2025
      tumbuh 1,74% (yoy), lebih rendah dari triwulan sebelumnya sebesar 2,84% (yoy).
      Indeks demand properti komersial untuk kategori jual pada triwulan I 2025 tumbuh
      0,48% (yoy), lebih tinggi dibandingkan triwulan sebelumnya sebesar 0,35% (yoy).




                                          - 58 -
Page 76
                Grafik 10. Indeks Demand Kategori Sewa (%yoy)




                Grafik 11. Indeks Demand Kategori Jual (%yoy)




Indeks supply properti komersial untuk kategori sewa pada triwulan I 2025 tumbuh
2,04% (yoy), lebih rendah dari triwulan sebelumnya sebesar 2,89% (yoy). Indeks
supply properti komersial untuk kategori jual pada triwulan I 2025 tumbuh 0,23%
(yoy), meningkat dibandingkan triwulan sebelumnya sebesar 0,11% (yoy).
                 Grafik 12. Indeks Supply Kategori Sewa (%yoy)




                 Grafik 13. Indeks Supply Kategori Jual (%yoy)




                                  - 59 -
Page 77
Peningkatan permintaan properti komersial berdampak signifikan terhadap
peningkatan harga sewa. Indeks harga properti komersial untuk kategori sewa
pada triwulan I 2025 tumbuh sebesar 2,53% (yoy), lebih tinggi dibandingkan
triwulan sebelumnya sebesar 0,93% (yoy). Sementara itu, indeks harga pada
kategori jual juga mengalami peningkatan menjadi sebesar 0,42% (yoy), lebih
tinggi dibandingkan 0,19% (yoy) pada triwulan sebelumnya.
                Grafik 14. Indeks Harga Kategori Sewa (%yoy)




                 Grafik 15. Indeks Harga Kategori Jual (%yoy)




                                 - 60 -
Page 78
                                        BAB IV
                                 PENILAIAN PROPERTI


4.1   Metode Penilaian
      Prosedur penilaian dilaksanakan dengan mengaplikasikan metode yang berlaku
      umum dalam penilaian Investasi sesuai dengan standar penilaian Indonesia (SPI
      Edisi VII – 2018).
      Ada tiga pendekatan umum dalam penilaian properti seperti yang telah banyak
      dipergunakan selama ini, antara lain :
      4.1.1   Pendekatan Pasar (Market Approach)
              Pendekatan pasar memberikan indikasi nilai degan membandingkan
              aset dengan aset lainnya yang identik dan sebanding dimana terdapat
              informasi harga.
              Pendekatan asar seharusnya diterapkan dan diberikan bobot signifikan
              dalam kondisi berikut :
              1.   Aset yang dinilai baru saja dijual dalam transaksi yang sesuai untuk
                   pertimbangan yang terdapat dalam Dasar Nilai yang digunakan
              2.   Aset yang dinilai atau aset yang secara substansial sejenis
                   diperdagangkan di publik secara aktif, dan/atau
              3.   Terdapat beberapa transaksi dan/atau transaksi terkini yang dapat
                   diobservasi untuk aset yang secara substansial sejenis
              Metode yang umum digunakan dalam pendekatan pasar adalah
              Metode Perbandingan Data Pasar (Direct Comparison Method), yaitu
              menggunakan informasi dari transaksi atau penawaran yang melibatkan
              aset yang sama atau sejenis dengan aset yang dinilai untuk
              mendapatkan indikasi nilai.
              Beberapa langkah penting dalam metode perbandingan data pasar
              adalah :
              1.   Mengidentifikasi unit perbandingan yang digunakan oleh pelaku
                   pasar pada pasar yang relevan
              2.   Mengidentifikasi data transaksi atau penawaran pembanding yang
                   relevan dan menghitung tolak ukur utama penilaian (key valuation
                   metrics) pada data tersebut
              3.   Melaksanakan analisis perbandingan yang konsisten terhadap
                   persamaan dan perbedaan kualitatif dan kuantitatif antara aset
                   pembanding dengan aset yang dinilai
              4.   Membuat penyesuaian yang diperlukan (jika ada) terhadap tolok
                   ukur utama penilaian untuk merefleksikan perbedaan antara aset
                   yang dinilai dengan aset pembanding
              5.   Menerapkan tolak ukur utama penilaian yang disesuaikan terhadap
                   aset yang dinilai, dan
              6.   Apabila digunakan beberapa tolak ukur dalam penilaian, maka
                   dapat dilakukan rekonsiliasi terhadap indikasi nilai.




                                        - 61 -
Page 79
4.1.2   Pendekatan Pendapatan (Income Approach)
        Pendekatan   pendapatan      memberikan      indikasi nilai   dengan
        mengkonversi arus kas masa depan menjadi satu nilai saat ini. Pada
        pendekatan pendapatan, nilai aset ditentukan dengan referensi kepada
        pendapatan, arus kas, atau penghematan biaya yang dihasilkan aset.
        Pendekatan pendapatan seharusnya diterapkan dan diberikan bobot
        signifikan dalam kondisi berikut :
        1.   Pelaku pasar melihat kemampuan aset menghasilkan pendapatan
             adalah unsur penting yang mempengaruhi nilai, dan/atau
        2.   Tersedia proyeksi yang wajar [dengan waktu yang sesuai] atas
             pendapatan masa depan untuk aset yang dinilai, apabila hanya
             terdapat atau sedikit atau tidak ada data pembanding pasar yang
             relevan untuk menerapkan Pendekatan Pasar
        Walaupun terdapat beberapa cara untuk mengimplementasikan
        Pendekatan Pendapatan, namun pada dasarnya adalah mendiskonto
        arus kas masa depan menjadi nilai kini. Terdapat variasi dari metode
        Metode Diskonto Arus Kas (Discounted Cash Flow Method).

4.1.3   Pendekatan Biaya (Cost Approach)
        Pendekatan biaya memberikan indikasi nilai menggunakan prinsip
        ekonomi bahwa pembeli akan membayar aset tidak lebih dar biaya
        untuk mendapatkan aset dengan utilitas yang sama, baik melalui
        pembelian atau dengan pembuatan konstruksi dengan mengecualikan
        faktor-faktor seperti waktu yang tidak semestinya, ketidaknyamanan,
        risiko atau faktor-faktor lainnya. Pendekatan ini memberikan indikasi nilai
        dengan menghitung biaya pengganti atau reproduksi saat ini dari aset
        dan membuat pengurangan untuk kemunduran fisik dan seluruh bentuk
        keusangan lainnya yang relevan.
        Pendekatan biaya seharusnya diterapkan dan diberikan bobot signifikan
        dalam kondisi berikut :
        1.   Pelaku pasar akan mampu membuat kembali aset dengan utilitas
             yang secara substansial sama dengan aset yang dinilai, tanpa
             adanya restriksi dari aspek hukum atau regulasi, dan aset dapat
             dibuat kembali dalam waktuyang cukup cepat secara wajar
             dimana pelaku pasar tidak akan membayar premium yang signifikan
             untuk dapat segera menggunakan aset tersebut
        2.   Aset tidak menghasilkan pendapatan secara langsung dan sifat unik
             dari aset membuat penggunaan Pendekatan Pendapatan atau
             Pendekatan Pasar menjadi tidak layak, dan/atau
        3.   Dasar Nilai yang digunakan secara fundamental didasarkan pada
             biaya pengganti
        Pada umumnya, terdapat tiga metode pedekatan biaya :
        1.   Metode Biaya Pengganti dikenal juga dengan Metode Biaya
             Pengganti Terdepresiasi (Depreciated Replacement Cost Method);
             metode yang mengindikasikan nilai dengan menghitung biaya
             untuk membuat aset yang serupa dengan utilitas yang setara




                                   - 62 -
Page 80
               2.   Metode Biaya Reproduksi; metode yang mengindikasikan nilai
                    dengan menghitung biaya untuk membuat replika aset, dan
               3.   Metode Penjumlahan; metode yang menghitung nilai aset dengan
                    menjumlahkan nilai dari setiap bagian komponennya.

4.2   Pemilihan Metode Penilaian
      Dalam penilaian ini, Pendekatan Penilaian yang tepat terhadap objek penilaian
      Tanah Jetty dan Hauling Road dengan Pendekatan Pasar (Market Approach)
      Metode Perbandingan Data Pasar (Market Comparison Method).
      ✓ Konsep Pendekatan Pasar adalah menghasilkan nilai dengan cara
        membandingkan aset yang dinilai dengan aset yang identik atau sebanding,
        yang telah dipasarkan dalam pasar yang terbuka, dimana informasi harga
        transaksi atau penawaran tersedia.
      Data pembanding yang dikumpulkan memiliki karakteristik yang sama dengan
      properti yang dinilai. Hal ini termasuk aspek legalitas, fisik, lokasi dan karakteristik
      penggunaan yang konsisten dengan properti yang dinilai serta merefleksikan
      kondisi di pasar dimana terjadi persaingan dengan properti yang dinilai.
      Sedangkan pendekatan penilaian yang tepat terhadap objek penilaian
      Bangunan, Jetty & Dermaga, Sarana & Prasarana, Mesin & Peralatan, Alat Berat
      & Kendaraan, Konstruksi BL 3A, Construction In Progress, serta Sparepart, dengan
      Pendekatan Biaya (Cost Approach) Metode Penggantian Biaya Terdepresiasi
      (Depreciated Replacement Cost, DRC Method).
      ✓ Pendekatan Pasar tidak dapat diterapkan dalam penilaian ini karena data
        pembanding yang digunakan hanya untuk objek penilaian tanah, sedangkan
        untuk objek penilaian bangunan menggunakan pendekatan biaya;
      ✓ Pendekatan Pendapatan tidak dapat diterapkan dalam penilaian ini karena
        Kurangnya akses terhadap informasi terkait dengan aset yang dinilai
        (misalnya akses ke laporan keuangan historis namun tidak untuk
        proyeksi/budget) dan kurangnya pelaku pasar melihat kemampuan aset
        menghasilkan pendapatan;
      ✓ Pendekatan Biaya dapat diterapkan dalam penilaian ini karena objek
        diatasnya merupakan satu kesatuan yang tidak dapat dipisahkan. Data
        harga penawaran/transaksi dari properti pembanding yang sejenis dan
        sebanding dengan objek penilaian tidak tersedia, dan sesuai dengan prinsip
        kontribusi nilai objek penilaian adalah nilai tanah ditambahkan nilai
        bangunan.
      Estimasi nilai pasar tanah diperoleh melalui pendekatan data pasar, mengingat
      harga penawaran / transaksi properti pembanding tersedia dan estimasi nilai
      pasar objek lain diperoleh dengan pendekatan biaya dengan pertimbangan
      biaya pengganti terdepresiasi (Depreciated Replacement Cost), penyusutan
      (fisik, fungsi dan ekonomis), umur ekonomis dan kondisi dapat ditentukan. Estimasi
      nilai diperoleh dengan mengurangi DRC dengan penyusutan.

4.3   Penerapan Metode Penilaian
      4.3.1    Tanah Jetty Muara Pahu BL1-BL3 dan Tanah KM 0-8 CHR Muara Pahu
               Berikut ditampilkan harga properti disekitar objek penilain yang memiliki
               karakteristik yang sama :




                                            - 63 -
Page 81
                    Tabel 10. Uraian Data Pembanding
     Uraian Data
                               Data 1          Data 2               Data 3
     Pembanding
  Alamat Properti       Muara Jawa       Sanga-sanga         Loa Duri Ulu
  Jenis Properti        Tanah Kosong     Tanah Kosong        Tanah Kosong
  Luas Tanah (Ha)       5,1              8,0                 3,5
  Hak Kepemilikan       AJB              AJB                 SHM


                        Data Transaksi / Penawaran
  Contact person        Bapak Herman     Bapak Wenny         Bapak Herman
  No.Telepon            0812 5114 0831   0813 1345 2882      0812 5114 0831
  Tanggal Data          16 Juni 2025     16 Juni 2025        16 Juni 2025
  Penawaran
  Lama dipasarkan       ± 3 bulan        ± 3 bulan           ± 3 bulan
  Status harga          Penawaran        Penawaran           Penawaran
  Harga Penawaran       17.850.000.000   35.000.000.000      10.500.000.000
  / Transaksi (Rp)


Berikut ditampilkan lokasi data pembanding :
                    Gambar 4. Peta Data Pembanding




   Objek

                                                Data 3



                                                           Data 2




                                                         Data 1



Estimasi nilai menggunakan pendekatan pasar dengan metode
perbandingan langsung dengan pertimbangan harga transaksi atau
penawaran dari properti sejenis dan sebanding dengan objek penilaian
tersedia.
Dengan demikian nilai objek tanah pada objek penilaian tanah objek
penilaian adalah :




                              - 64 -
Page 82
                         Tabel 11. Nilai Pasar Objek Penilaian Tanah

        No.              Uraian                     Luas (m2)   Nilai Pasar (USD)   Nilai Pasar (IDR)

              Tanah Jetty Muara Pahu BL1-
        1.                                          5.058.626       1.362.069,11      22.192.192.000
              BL3
              Tanah KM 0 - 8 CHR Muara
        2.                                          5.000.823       2.890.152,70      47.089.258.000
              Pahu

                         TOTAL                                      4.252.221,81      69.281.450.000



4.3.2    Bangunan
         Estimasi nilai dengan menggunakan pendekatan biaya, karena Nilai
         Wajar bangunan yang melekat diatas tanah tidak diperjualbelikan
         secara terpisah.
         Biaya pembuatan/penggantian baru (Reproduction/Replacement Cost
         New, RCN) bangunan dengan harga satuan per meter persegi
         merupakan hasil perhitungan analisis harga satuan bangunan
         berdasarkan biaya langsung dan tidak langsung serta pajak terkait
         dengan pembangunan bangunan. Selain itu, sebagai referensi
         digunakan panduan terbaru dari MAPPI mengenai Panduan Biaya dan
         Teknis Bangunan (BTB).
         Umur ekonomis suatu bangunan belum ada standar atau panduannya.
         Dari berbagai referensi dan bahan konstruksi yang digunakan, umur
         bangunan dapat diperkirakan. Umur efektif suatu bangunan ditentukan
         berdasarkan kondisi dan kegunaannya sesuai dengan kondisi terlihat
         (observed condition).
         Nilai bangunan diperoleh dari RCN dikurangi dengan penyusutan yang
         disebabkan oleh keusangan fisik, serta kemunduran fungsional dan
         ekonomis jika ada terhadap bangunan objek penilaian.
                       Tabel 12. Nilai Pasar Objek Penilaian Bangunan

        No.                       Uraian                        Nilai Pasar (USD)   Nilai Pasar (IDR)

         1.   Mess Karyawan Muara Pahu (70 Kamar)                     497.161,00       8.100.244.000

         2.   BUMK - Kantor M.Pahu                                     17.891,00         291.498.000

         3.   BUMK - Kantin,Dapur M.Pahu                               29.805,00         485.613.000

              Mess Karyawan "U1" Kapasitas 26 Unit
         4.                                                           142.619,00       2.323.691.000
              Kamar Km 5, Muara Pahu
              Mess Karyawan "U2" Kapasitas 26 Unit
         5.                                                           142.619,00       2.323.691.000
              Kamar Km 5, Muara Pahu

         6.   Kantin                                                     8.610,00        140.283.000

         7.   Mess A                                                   66.872,00       1.089.545.000

         8.   Mess B                                                   66.872,00       1.089.545.000




                                           - 65 -
Page 83
 9.   Mess C                                       66.872,00     1.089.545.000

10.   Mess D & E                                  133.306,00     2.171.955.000

11.   Mess U3                                     148.266,00     2.415.698.000

12.   Mess U4                                     163.093,00     2.657.274.000

      Jembatan Walkway 108 M Di Camp B
13.                                                16.625,00      270.871.000
      M.Pahu

14.   Laundry Camp B - Bumkam Seranai Jaya         25.867,00      421.451.000

      Jembatan Walkway 43 M Di Camp B
15.                                                  5.999,00      97.742.000
      M.Pahu
      Rumah Penawasan Settling Pond 1 - Jetty
16.                                                  4.697,00      76.528.000
      Muara Pahu
      Rumah Penawasan Settling Pond 2 - Jetty
17.                                                  4.605,00      75.029.000
      Muara Pahu
      Gudang Camp Service & Maintenance Di
18.                                                20.920,00      340.850.000
      Camp B M. Pahu

19.   Pos Security Camp B Jetty M. Pahu            11.819,00      192.567.000

      Jembatan Walkway 32 Meter Di Camp B
20.                                                  5.247,00      85.489.000
      M. Pahu

21.   Rumah Panel Tower Telkomsel Km 5 Abit          3.898,00      63.510.000

22.   Mess Motorist                                24.135,00      393.232.000

23.   Mess Karyawan "U5" Km 5, M.Pahu             163.093,00     2.657.274.000

24.   Mess Karyawan "U6" Kamar Km 5, M.Pah        170.505,00     2.778.038.000

25.   Jembatan Walkaway 60m Camp B                 12.570,00      204.803.000

      Mess Karyawan Putri 60 Unit Km 5 Muara
26.                                               349.887,00     5.700.709.000
      Pahu

27.   Kantin Non Staf Camp B - Muara Pahu          44.248,00      720.933.000

      Power House & Panel Room - Km 6 Muara
28.                                              1.754.485,00   28.585.824.000
      Pahu

29.   Mushola Camp B - Muara Pahu                  22.075,00      359.668.000

      Mess Karyawan U1, U2, U3 (78 Unit Kamar)
30.                                               482.543,00     7.862.073.000
      M. Pahu
      Mess Karyawan U4, U5, U6 (78 Unit Kamar)
31.                                               487.183,00     7.937.673.000
      M. Pahu

32.   Mess Tamu 20 Unit Kamar Km 5 M.Pahu         219.233,00     3.571.963.000

      Mess Dept Head 40 Unit Kamar Km 5 M.
33.                                               233.260,00     3.800.505.000
      Pahu




                              - 66 -
Page 84
        34.   Masjid Km 5 Muara Pahu                       63.587,00     1.036.023.000

        35.   Pos Pam Obvitnas Muara Pahu                  13.951,00      227.304.000

        36.   Control Room Main Office Muara Pahu       2.353.531,00    38.346.081.000

        37.   Mess Security 20 Kamar Jetty Muara Pahu     112.484,00     1.832.702.000

              Rumah Penawasan Settling Pond Abit
        38.                                                 5.840,00        95.151.000
              Jetty Muara Pahu

        39.   Office Barging Chp M. Pahu                   45.527,00      741.771.000

        40.   Office QC CHP M. Pahu                        42.655,00      694.978.000

        41.   Office Buyer & Surveyor Chp M. Pahu          42.007,00      684.420.000

        42.   Kantin&Dapur Security Camp B M.Pahu          28.730,00      468.098.000

        43.   Pos Security Jetty Muara Pahu                 2.722,00        44.350.000

        44.   Pembangunan Pos Pam Obvitnas Jetty Sp        15.450,00      251.727.000

        45.   Gudang Tawas & Kapur Jetty Muara Pahu         7.542,00      122.882.000

              Mess Karantina 20 Kamar Jetty Muara
        46.                                                88.325,00     1.439.079.000
              Pahu
              Pembangunan Extend Kantin Camp C Km
        47.                                                30.733,00      500.733.000
              5 Abit

        48.   Sport Hall Di Muara Pahu                    725.651,00    11.823.032.000

        49.   Rumah Server Tower Telkomsel T0 (Nol)        12.019,00      195.826.000

        50.   3 Unit Warehouse Roller Chp                  18.845,00      307.042.000

        51.   Bayan Mart Jetty Muara Pahu                  65.210,00     1.062.467.000

        52.   Control Room Jetty Muara Pahu               109.972,00     1.791.774.000

        53.   Coal Lab Jetty Muara Pahu                   282.712,00     4.606.227.000

        54.   Side Dump Office                             92.585,00     1.508.487.000

                                 TOTAL                  9.706.958,00   158.155.468.000


4.3.3    Jetty dan Dermaga, serta Konveyor
         Estimasi nilai dengan menggunakan pendekatan biaya. Estimasi nilai
         diperoleh dari RCN dikurangi dengan penyusutan yang disebabkan oleh
         keusangan fisik, serta kemunduran fungsional dan ekonomis jika ada
         terhadap objek penilaian. RCN didapatkan dengan mengkalikan harga
         perolehan dan tahun perolehan dengan Cost Index, dan beberapa
         variabel lainnya, kemudian dikurangi dengan penyusutan.
         Dengan demikian nilai objek penilaian jetty dan dermaga, serta konveyor




                                         - 67 -
Page 85
         adalah sebagai berikut :
                Tabel 13. Nilai Pasar Objek Penilaian Jetty Dermaga Line 1 2 3

        No.                      Uraian                    Nilai Pasar (USD)    Nilai Pasar (IDR)

         1.   Civil Jetty Muara Pahu Line 1                   16.676.189,44      271.705.155.000

         2.   Civil Jetty Muara Pahu Line 2                   19.874.577,64      323.816.494.000

         3.   Civil Jetty Muara Pahu Line 3                   20.095.314,00      327.412.951.000

                                 TOTAL                        56.646.081,08      922.934.600.000



4.3.4    Infrastruktur
         Estimasi nilai dengan menggunakan pendekatan biaya. Estimasi nilai
         diperoleh dari RCN dikurangi dengan penyusutan yang disebabkan oleh
         keusangan fisik, serta kemunduran fungsional dan ekonomis jika ada
         terhadap objek penilaian. RCN didapatkan dengan mengkalikan harga
         perolehan dan tahun perolehan dengan Cost Index, dan beberapa
         variabel lainnya, kemudian dikurangi dengan penyusutan.
         Dengan demikian nilai objek penilaian infrastruktur adalah sebagai
         berikut :
                         Tabel 14. Nilai Pasar Objek Penilaian Infrastruktur

        No.                       Uraian                    Nilai Pasar (USD)     Nilai Pasar (IDR)

         1.   Fuel Tank KM 0 Muara Pahu 2500KL satu unit           383.486,47        6.248.145.000

         2.   Fuel Tank KM 6 2500KL dua unit                     1.429.377,28       23.288.844.000

              Fasilitas KM 8 CHP Muara Pahu
         3.                                                     12.397.652,00      201.994.944.000
              (Hauling Road)

                                  TOTAL                         14.210.515,75      231.531.933.000


4.3.5    Mesin dan Peralatan
         Estimasi nilai dengan menggunakan pendekatan biaya. Estimasi nilai
         diperoleh dari RCN dikurangi dengan penyusutan yang disebabkan oleh
         keusangan fisik, serta kemunduran fungsional dan ekonomis jika ada
         terhadap objek penilaian. RCN didapatkan dengan mengkalikan harga
         perolehan dan tahun perolehan dengan Cost Index, dan beberapa
         variabel lainnya, kemudian dikurangi dengan penyusutan.
         Dengan demikian nilai objek penilaian mesin dan peralatan adalah
         sebagai berikut :
         Tabel 15. Nilai Pasar Objek Penilaian Konveyor Jetty Muara Pahu BL1-BL3

        No.                      Uraian                    Nilai Pasar (USD)    Nilai Pasar (IDR)

         1.   Konveyor Jetty Muara Pahu BL1-BL3               77.559.963,68     1.263.684.490.000




                                          - 68 -
Page 86
             Tabel 16. Nilai Pasar Objek Penilaian Mesin dan Peralatan
                                                       Nilai Pasar       Nilai Pasar
No.                         Uraian
                                                          (USD)             (IDR)
 1    Crusher Side Dump 1 KM 6                         2.440.097,22   39.756.504.000
 2    Crusher Side Dump 2 KM 6                         2.440.097,22   39.756.504.000
 3    Crusher Side Dump 3 KM 6                         1.220.048,61   19.878.252.000
 4    Weight Bridge Muara Pahu                           342.505,12      5.580.436.000
 5    Weight Bridge Muara Pahu                           255.389,80      4.161.066.000
 6    Weight Bridge Muara Pahu                           255.376,73      4.160.853.000
 7    POWER GENERATOR 15KVA 12KW SILENT, Genset SN
      : S202001010 + S202001002 + F16E2011446 +            9.340,21       152.180.000
      F16E2011447 + WR164D + FLD1909619
 8    POWER GENERATOR SET 13.5KVA-SILENT TYPE,
                                                          29.546,25       481.397.000
      PG2209003501 - PG2209003520
 9    POWER GENERATOR SET 150KVA SILENT TYPE -
                                                           7.796,91       127.035.000
      PERKINS
 10   ATLAS COPCO AIR COMPRESSOR PORTABLE                  9.309,03       151.672.000
 11   POWER GENERATOR SET CATERPILAR C15 500KVA -
                                                         100.126,99      1.631.369.000
      SILENT TYPE
 12   POWER GENERATOR 2000KVA 400V/50Hz(DG/3516B)
      (JCH00288 + JCH00300 + JCH00301 + JCH00302 +
                                                       1.880.918,19   30.645.800.000
      JCH00303 + JCH00304 + JCH00305 + JCH00306 +
      JCH00307)
 13   TRAKINDO UTAMA, PT-TRAKINDO U, GENSET SN
                                                          42.359,54       690.164.000
      LXJ0973 INV.
 14   TRAKINDO UTAMA, PT-TRAKINDO U, GENSET SN
                                                          42.359,54       690.164.000
      LXJ0974 INV.
 15   POWER GENERATOR 2000KVA 400V/50Hz(DG/3516B)
      (TRAKINDO) (S/N :                                1.074.373,53   17.504.768.000
      JCH00294;JCH00297;JCH00299;JCH00295;JCH00298)
 16   POWER GENERATOR 2000KVA 400V/50Hz(DG/3516B)
      (TRAKINDO) (S/N : JCH00286; JCH00287;JCH00289;     859.498,86   14.003.815.000
      JCH00296)
 17   GENSET SILENT PERKINS 13.5 KVA, Genset SN :
                                                           5.579,70        90.910.000
      S202001032 & S202001034
 18   ATLAS COPCO AIR COMPRESSOR 12 BAR/175 PSI SN
                                                           6.088,44        99.199.000
      : WUX666714
 19   GENSET VOLVO TAD734GE-250KVA, Generator SN :
                                                          29.882,83       486.881.000
      X16J435615 & X16L521614
 20   ATLAS COPCO B6 + LIGHTNING TOWER (SN : ESF
                                                          31.660,59       515.846.000
      208054 + 208055 + 208319 + 208320)
 21   DIESEL GENERATOR ASSY ( KRISBOW )                     513,59           8.368.000
 22   PORTABLE AIR COMPRESSOR 7 BAR (Part No. MIS-
                                                           6.537,41       106.514.000
      ELGI-PG185-100)
 23   DIESEL GENERATOR ASSY ( KRISBOW )                    1.456,39        23.729.000
 24   ATLAS COPCO B6 + LIGHTNING TOWER                    61.348,43       999.550.000




                                  - 69 -
Page 87
        25   ATLAS COPCO AIR COMPRESSOR PORTABLE SN :
                                                                    11.355,67        185.018.000
             WUP200143
        26   DEWATERING PUMP MULTIFLOW CF45LV + P6T
                                                                    85.756,28      1.397.227.000
             PONTOON
        27   DEWATERING PUMP MULTIFLOW CF 45LV +
                                                                    85.756,28      1.397.227.000
             PONTOON 6 TON
        28   GENERATOR D4000W 1PH SILENT KRPD40                      2.431,54         39.617.000
        29   POWER GENERATOR 80KVA 1104A-44TG2 - PERKINS            25.387,65        413.641.000
        30   ATLAS COPCO B6 + LIGHTNING TOWER                       28.938,26        471.491.000
        31   MIG WELDING INVERTER-MILLER                            30.213,47        492.268.000
        32   FAWDE POWER GENSET 20KVA SILENT TYPE 4DW91-
                                                                    15.891,55        258.921.000
             23D
        33   OIL INJECTED AIR COMPRESSOR + AIR DRYER + PRE
             FILTER + AFTER FILTER + AIR RECEIVER TANK 1000L        13.006,87        211.921.000
             GDK22-10 SN : 2472762
        34   FAWDE POWER GENSET 40KVA SILENT TYPE,
                                                                     9.140,67        148.929.000
             Generator SN : SPG23060038 & SL202402014
        35   FAWDE POWER GENERATOR 20KVA-SILENT TYPE,
                                                                     6.254,59        101.906.000
             Generator SN : K24161601 + K24161602

                                  TOTAL                         11.466.343,95   186.821.142.000



4.3.6        Alat Berat dan Kendaran
             Estimasi nilai dengan menggunakan pendekatan biaya. Estimasi nilai
             diperoleh dari RCN dikurangi dengan penyusutan yang disebabkan oleh
             keusangan fisik, serta kemunduran fungsional dan ekonomis jika ada
             terhadap objek penilaian. RCN didapatkan dengan mengkalikan harga
             perolehan dan tahun perolehan dengan Cost Index, dan beberapa
             variabel lainnya, kemudian dikurangi dengan penyusutan.
             Dengan demikian nilai objek penilaian alat berat dan kendaraan adalah
             sebagai berikut :
                          Tabel 17. Nilai Pasar Alat Berat dan Kendaraan
    No.                         Uraian                     Nilai Pasar (USD)    Nilai Pasar (IDR)
         1    EXCAVATOR CATERPILLAR 320NG AMPHIBIOUS
                                                                  87.250,97        1.421.580.000
              SLR S/N : YBP10811
         2    EXCAVATOR CATERPILLAR 320NG AMPHIBIOUS
                                                                  87.250,97        1.421.580.000
              SLR S/N : ZBN30422
         3    BASE MACHINE, SWAMP SHOE, STRAIGHU TILT
                                                                  61.127,72          995.954.000
              DOZER S/N : 66037
         4    BASE MACHINE, SWAMP SHOE, STRAIGHU TILT
                                                                  83.594,55        1.362.006.000
              DOZER S/N : 66037
         5    XCMG EXCAVATOR XE215C S/N :
                                                                  28.977,35          472.128.000
              XUGF215BKMKA04342
         6    XCMG EXCAVATOR XE215C S/N :
                                                                  28.977,35          472.128.000
              XUGF215BPMKA04386
         7    XCMG EXCAVATOR XE215C S/N :
                                                                  28.977,35          472.128.000
              XUGF215BVMKA04281




                                          - 70 -
Page 88
8    XCMG EXCAVATOR XE215CLL S/N :
                                                 36.323,64    591.821.000
     XUGA215LAMKA00217 (LONG ARM)
9    XCMG EXCAVATOR XE215CLL S/N :
                                                 36.323,64    591.821.000
     XUGA215LAMKA00218 (LONG ARM)
10   XCMG EXCAVATOR XE215CLL S/N :
                                                 36.323,64    591.821.000
     XUGA215LLMKA00219 (LONG ARM)
11   XCMG EXCAVATOR XE490DK S/N :
                                                 91.303,57   1.487.609.000
     XUGA490ALKA03460
12   SWAMP EXCAVATOR XCMG XE215SLL S/N :
                                                 66.144,05   1.077.685.000
     XUGA215LHNKA00210
13   BULL DOZER D85E SS-2 S/N : J19538           85.023,75   1.385.292.000
14   DUMP TRUCK 20 M3 MERCEDES BENZ AXOR
                                                 23.854,85    388.667.000
     2528C 6X4 S/N : MFJ 400 243 NJ 000621
15   DUMP TRUCK 20 M3 MERCEDES BENZ AXOR
                                                 23.854,85    388.667.000
     2528C 6X4 S/N : MFJ 400 243 NJ 000685
16   BULL DOZER D85E SS-2 S/N : J19639          106.604,74   1.736.911.000
17   BULL DOZER D85E SS-2 S/N : J19640          106.604,74   1.736.911.000
18   FUEL TRUCK VOLVO FMX-400 6X6-25KL S/N :
                                                101.012,89   1.645.803.000
     YV2XS02E1NA300087
19   WATER TRUCK VOLVO FMX-400 6X4-30KL S/N :
                                                 88.217,95   1.437.335.000
     YV2XSG0D7NB374045
20   ARTICULATED DUMP TRUCK VOLVO A40G S/N :
                                                154.046,65   2.509.882.000
     VCEOA40GL00324491
21   ARTICULATED DUMP TRUCK VOLVO A40G S/N :
                                                154.046,65   2.509.882.000
     VCEOA40GE00324479
22   BULLDOZER SHANTUI DH24B2-LGP S/N:
                                                 62.587,80   1.019.743.000
     CHSDH24HHNB000325
23   MOTOR GRADER GD825 S/N: 13442              210.999,88   3.437.821.000
24   COMPACTOR BOMAG BW220-D5 S/N:
                                                 47.393,73    772.186.000
     961587611077
25   COMPACTOR BOMAG BW220-D5 S/N:
                                                 47.393,73    772.186.000
     961587611078
26   TELEHANDLER MANITOU MHU-X 790 S/N :
                                                 92.491,87   1.506.970.000
     MAN00000V01074258
27   BULLDOZER CATERPILLAR D8T COAL BLADE
                                                244.647,82   3.986.047.000
     S/N: JJ501813
28   ROUGH TERRAN CRANE ZOOMLION ZRT850V
                                                150.335,60   2.449.418.000
     S/N : ZRT850-0171
29   BULL DOZER KOMATSU D375A 6R COAL BLADE
                                                446.080,96   7.267.997.000
     S/N: 66056
30   BULL DOZER KOMATSU D375A 6R COAL BLADE
                                                446.080,96   7.267.997.000
     S/N: 66060
31   CRANE TRUCK VOLVO HYVAA8T FMX440 6X6
                                                123.360,15   2.009.907.000
     S/N : YV2XS0EXPA318302
32   LOW BED 80T SCANIA R620-A 6X4 S/N :
                                                149.730,56   2.439.560.000
     YS2R6X400N5673671
33   WHEEL LOADER WA980 S/N :
                                                258.187,99   4.206.657.000
     CAT00980AMK900695
34   FORKLIFT 3.5T S/N: CT14E-85955              13.753,08    224.079.000




                                 - 71 -
Page 89
        35    MANHAUL 50 SEAT VOLVO FMX 440 6X6 S/N:
                                                            112.854,11     1.838.732.000
              2244520
        36    FUEL TRUCK 40KL VOLVO FMX-440 8X4 Engine
                                                            104.536,30     1.703.210.000
              No: 2237532
        37    WATER TRUCK 40KL VOLVO FMX-440 8X4
                                                            101.038,42     1.646.219.000
              Engine No:2237131 S/N : YV2XS02G3PA316800
        38    CARGO TRUCK PS135 C/W AIR CONDITIONER
                                                             18.129,93      295.391.000
              S/N: MHMFE75EKPK009558
        39    CHEMICAL TRUCK HINO FM260 WITH PUMP-10T
                                                             42.703,25      695.764.000
              S/N : MJEFM8JN2NJX15325
        40    WATER TRUCK 40KL VOLVO FMX-440 8X4 S/N :
                                                             99.626,22     1.623.210.000
              YV2XS02G4PA316885
        41    BULLDOZER CAT D8T C/W COAL BLADE S/N:
                                                            283.531,64     4.619.581.000
              JJ800586
        42    BULLDOZER CAT D10T C/W COAL BLADE S/N:
                                                            460.295,83     7.499.600.000
              CAT0D10TLRAB01514
        43    SMALL CRANE TRUCK HYVA HB60E2-COMP
                                                             25.404,10      413.909.000
              SINGLE CABIN S/N : MHMFE74EHPK001903
        44    SMALL CRANE TRUCK HYVA HB60E2-COMP
              DOUBLE CABIN S/N : MHMFE74EHPK001556 &         54.989,44      895.943.000
              MHMFE74EHPK001293
        45    MANITOU MTX1840-TELEHANDLE S/N :
                                                             75.385,20     1.228.251.000
              MNA00000A01105431
        46    MITSUBISHI FUSO FE 74 HD GARBAGE TRUCK
              C/W ARM ROL + CONTAINER ARM ROLL               19.691,52      320.834.000
              TERTUTUP S/N : MJECCB2F7P5014531
        47    MANITOU MRT-X2545-TELEHANDLE S/N :
                                                            165.125,88     2.690.396.000
              MAN00000J01117297
        48    MOBIL SCANIA 410-6X4 CRANE TRUCK 10T
                                                            115.683,36     1.884.829.000
              HYVA S/N : YS2P6X400P9322427
        49    MIXER TRUCK 7M³-MITSUBISHI FN62F 6X4           43.460,50      708.102.000
        50    FORKLIFT DP-100NH CATERPILLAR                  38.955,75      634.706.000
        51    BOOM LIFT ZT34J ZOOMLION                       74.480,14     1.213.505.000
        52    MECHANICAL TRUCK 260 PS SC KNUCKLE
              CRANE 5T + COMPRESSOR No. Rangka :             47.498,80      773.898.000
              MJEFG8JP2RJP11360
        53    SCANIA WASHING TRUCK 40KL G460-8X4 ACC        143.983,18     2.345.918.000
        54    HYDRAULIC EXCAVATOR 345GC-CATERPILAR          158.968,64     2.590.076.000

                                TOTAL                      5.995.228,20   97.680.253.000



4.3.7        Construction In Progress (Konstruksi BL 3A)
             Estimasi nilai dengan menggunakan pendekatan biaya. Estimasi nilai
             diperoleh dari RCN dikurangi dengan penyusutan yang disebabkan oleh
             keusangan fisik, serta kemunduran fungsional dan ekonomis jika ada
             terhadap objek penilaian. RCN didapatkan dengan mengkalikan harga
             perolehan dan tahun perolehan dengan Cost Index, dan beberapa
             variabel lainnya, kemudian dikurangi dengan penyusutan.
             Dengan demikian nilai objek penilaian konstruksi jetty BL 3A adalah
             sebagai berikut :




                                         - 72 -
Page 90
          Tabel 18. Nilai Pasar Objek Penilaian Construction In Progress (Konstruksi
                                            BL 3A)

        No.                       Uraian               Nilai Pasar (USD)   Nilai Pasar (IDR)

         1.   Konstruksi Jetty BL 3A                        7.759.648,53    126.427.953.000


4.3.8    Construction In Progress
         Estimasi nilai dengan menggunakan pendekatan biaya. Estimasi nilai
         diperoleh dari RCN dikurangi dengan penyusutan yang disebabkan oleh
         keusangan fisik, serta kemunduran fungsional dan ekonomis jika ada
         terhadap objek penilaian. RCN didapatkan dengan mengkalikan harga
         perolehan dan tahun perolehan dengan Cost Index, dan beberapa
         variabel lainnya, kemudian dikurangi dengan penyusutan.
         Dengan demikian nilai objek penilaian konstruksi bangunan adalah
         sebagai berikut :
                Tabel 19. Nilai Pasar Objek Penilaian Construction In Progress

        No.                       Uraian               Nilai Pasar (USD)   Nilai Pasar (IDR)

         1.   Mess Staf 20 Kamar Jetty Muara Pahu             77.351,03       1.257.341.000

              Gudang Quality Control & Barging Muara
         2.                                                    8.242,91          133.989.000
              Pahu

         3.   Mess Expat Muara Pahu                            7.422,93          120.660.000

         4.   Pos Security Main Office Muara Pahu             53.394,36          867.925.000

         5.   Mess Non Staf 15 Barak Kap.10 Kamar            258.809,27       4.206.945.000

         6.   Gereja Muara Pahu                               17.207,81          279.713.000

         7.   Gudang Tps LB3 Muara Pahu                       58.998,23          959.016.000

         8.   Klinik Muara Pahu                               53.590,05          871.106.000

         9.   Rumah IPAL Muara Pahu                           92.893,38       1.509.982.000

                                  TOTAL                      627.909,97      10.230.537.000


4.3.9    Sparepart Inventory
         Estimasi nilai dengan menggunakan pendekatan biaya. Estimasi nilai
         diperoleh dari RCN dikurangi dengan penyusutan yang disebabkan oleh
         keusangan fisik, serta kemunduran fungsional dan ekonomis jika ada
         terhadap objek penilaian. RCN didapatkan dengan mengkalikan harga
         perolehan dan tahun perolehan dengan Cost Index, dan beberapa
         variabel lainnya, kemudian dikurangi dengan penyusutan.
         Dengan demikian nilai objek penilaian sparepart inventory adalah
         sebagai berikut :




                                           - 73 -
Page 91
                               Tabel 20. Nilai Pasar Objek Penilaian Sparepart Inventory

                No.                            Uraian                        Nilai Pasar (USD)   Nilai Pasar (IDR)

                   1.     Sparepart Inventory                                    14.684.310,56    239.251.472.000


                   List nilai per sparepart inventory dapat dilihat pada lampiran.

4.4   Rekonsiliasi Nilai
      Dengan demikian nilai objek penilaian dapat dilihat pada tabel berikut :
                      Tabel 21. Nilai Pasar Objek Penilaian Aset PT Fajar Sakti Prima
                                                                           Nilai Pasar           Nilai Pasar
      No.                 Objek Penilaian                     Luas (m²)
                                                                              (USD)                 (IDR)
      >)    M uara Pahu

            A. Tanah
               Tanah Jetty M uara Pahu BL1-BL3                 5.058.626           1.362.069         22.192.192.000
               Tanah KM 0 - 8 CHR M uara Pahu                  5.000.823           2.890.153         47.089.258.000
            B. Bangunan                                                            9.706.958        158.155.468.000
            C. Jetty & Dermaga                                                    56.646.081        922.934.600.000

            D. Infrastruktur                                                      14.210.516        231.531.933.000
            E. M esin dan Peralatan                                               89.026.308      1.450.505.632.000
            F. Alat Berat & Kendaraan                                              5.995.228         97.680.253.000

            G. Konstruksi BL 3A (Construction In Progress )                        7.759.649        126.427.953.000
            H. Construction In Progress                                             627.910          10.230.537.000
             I. Sparepart                                                         14.684.310        239.251.472.000

                                Total Nilai                                     202.909.182      3.305.999.298.000


4.5   Kesimpulan Nilai
      Dengan mempertimbangkan seluruh informasi yang relevan dan melakukan
      pemeriksaan terhadap properti yang dinilai yang dilanjutkan dengan melakukan
      analisis dan pengolahan data serta dengan mempertimbangkan faktor-faktor
      yang mempengaruhi nilai, maka kami berpendapat bahwa Nilai Pasar (Market
      Value) objek penilaian per tanggal 16 Juni 2025 :

                                                        Nilai Pasar
                                                Rp3.305.999.298.000,-
        (Tiga Triliun Tiga Ratus Lima Miliar Sembilan Ratus Sembilan Puluh Sembilan Juta
                          Dua Ratus Sembilan Puluh Delapan Ribu Rupiah)

      Hasil penilaian ini untuk dipergunakan sesuai dengan tujuan penggunaan laporan
      penilaian, dan kami tidak mengambil tanggung jawab atas kerugian yang
      ditimbulkan atas penggunaan laporan ini yang bertentangan dengan komentar,
      penjelasan, asumsi dan kondisi pembatas yang tercantum didalam laporan ini.




                                                        - 74 -
Page 92

          
Page 93
                                         PENILAIAN PROPERTI
 LAMPIRAN                               PT FAJAR SAKTI PRIMA
FOTO OBJEK                              Objek Penilaian Berada di :
 PENILAIAN
                                  Jetty Muara Pahu, Kalimantan Timur.




    Tampak Jetty Dermaga Bagian Hulu                Tampak Jetty Dermaga Bagian Hulu




    Tampak Jetty Dermaga Bagian Hilir               Tampak Jetty Dermaga Bagian Hilir




  Tampak Jetty Dermaga Bagian Seberang            Tampak Jetty Dermaga Bagian Seberang
Page 94
                                        PENILAIAN PROPERTI
 LAMPIRAN                              PT FAJAR SAKTI PRIMA
FOTO OBJEK                            Objek Penilaian Berada di :
 PENILAIAN
                                  Jetty Muara Pahu, Kalimantan Timur.




        Tampak Hauling Road                          Tampak Hauling Road KM 03




      Tampak Hauling Road KM 05                      Tampak Hauling Road KM 06




      Tampak Hauling Road KM 08                      Tampak Hauling Road KM 10
Page 95
                                         PENILAIAN PROPERTI
 LAMPIRAN                               PT FAJAR SAKTI PRIMA
FOTO OBJEK                            Objek Penilaian Berada di :
 PENILAIAN
                                Jetty Muara Pahu, Kalimantan Timur.




 Tampak Bangunan Mess Karyawan Muara            Tampak Bangunan BUMK Seranai Jaya –
           Pahu (70 Kamar)                           Bangun Kantor Muara Pahu




  Tampak Bangunan BUMK Seranai Jaya –
                                                 Tampak Bangunan Mess Karyawan U1
     Bangun Kantin Dapur Muara Pahu




   Tampak Bangunan Mess Karyawan U2                    Tampak Bangunan Kantin
Page 96
                                       PENILAIAN PROPERTI
 LAMPIRAN                             PT FAJAR SAKTI PRIMA
FOTO OBJEK                            Objek Penilaian Berada di :
 PENILAIAN
                                Jetty Muara Pahu, Kalimantan Timur.




       Tampak Bangunan Mess A                         Tampak Bangunan Mess B




       Tampak Bangunan Mess C                      Tampak Bangunan Mess D dan E




   Tampak Bangunan Mess Karyawan U3              Tampak Bangunan Mess Karyawan U4
Page 97
                                       PENILAIAN PROPERTI
 LAMPIRAN                             PT FAJAR SAKTI PRIMA
FOTO OBJEK                            Objek Penilaian Berada di :
 PENILAIAN
                               Jetty Muara Pahu, Kalimantan Timur.




  Tampak Jembatan Walkway 108 Meter                Tampak Bangunan Laundry Camp




                                                 Tampak Bangunan Rumah Penawasan
   Tampak Jembatan Walkway 43 Meter
                                                           Settling Pond 1




  Tampak Bangunan Rumah Penawasan                  Tampak Bangunan Gudang Camp
            Settling Pond 2                           Services and Maintenance
Page 98
                                         PENILAIAN PROPERTI
 LAMPIRAN                               PT FAJAR SAKTI PRIMA
FOTO OBJEK                            Objek Penilaian Berada di :
 PENILAIAN
                                Jetty Muara Pahu, Kalimantan Timur.




  Tampak Bangunan Pos Security Camp B            Tampak Jembatan Walkway 32 Meter




  Tampak Bangunan Rumah Panel Tower
                                                    Tampak Bangunan Mess Motoris
          Telkomsel KM5 Abit




   Tampak Bangunan Mess Karyawan U5              Tampak Bangunan Mess Karyawan U6
Page 99
                                        PENILAIAN PROPERTI
 LAMPIRAN                              PT FAJAR SAKTI PRIMA
FOTO OBJEK                             Objek Penilaian Berada di :
 PENILAIAN
                                 Jetty Muara Pahu, Kalimantan Timur.




                                                 Tampak Bangunan Mess Karyawan Putri
   Tampak Jembatan Walkway 60 Meter
                                                           60 Unit Kamar




                                                   Tampak Bangunan Power House and
    Tampak Bangunan Kantin Non-Staff
                                                             Panel Room




                                                Tampak Bangunan Mess Karyawan U1, U2,
   Tampak Bangunan Musholla Camp B
                                                          U3 78 Unit Kamar
Page 100
                                        PENILAIAN PROPERTI
 LAMPIRAN                              PT FAJAR SAKTI PRIMA
FOTO OBJEK                             Objek Penilaian Berada di :
 PENILAIAN
                                Jetty Muara Pahu, Kalimantan Timur.




 Tampak Bangunan Mess Karyawan U4, U5,            Tampak Bangunan Mess Tamu 20 Unit
           U6 78 Unit Kamar                                   Kamar




  Tampak Bangunan Mess Dept. Head 40
                                                     Tampak Bangunan Masjid KM 05
             Unit Kamar




                                                  Tampak Bangunan Control Room Main
   Tampak Bangunan Pos PAM Obvitnas
                                                          Office Muara Pahu
Page 101
                                         PENILAIAN PROPERTI
 LAMPIRAN                               PT FAJAR SAKTI PRIMA
FOTO OBJEK                              Objek Penilaian Berada di :
 PENILAIAN
                                 Jetty Muara Pahu, Kalimantan Timur.




    Tampak Bangunan Mess Security 20               Tampak Bangunan Rumah Penawasan
                Kamar                                       Settling Pond Abit




   Tampak Bangunan Office Barging CHP                Tampak Bangunan Office QC CHP




   Tampak Bangunan Office Buyer and                 Tampak Bangunan Kantin dan Dapur
            Surveyor CHP                                    Security Camp B
Page 102
                                       PENILAIAN PROPERTI
 LAMPIRAN                             PT FAJAR SAKTI PRIMA
FOTO OBJEK                            Objek Penilaian Berada di :
 PENILAIAN
                                Jetty Muara Pahu, Kalimantan Timur.




     Tampak Bangunan Pos Security                Tampak Bangunan Pos PAM Obvitnas




  Tampak Bangunan Gudang Tawas dan               Tampak Bangunan Mess Karantina 20
        Kapur Jetty Muara Pahu                               Kamar




   Tampak Pembangunan Extend Kantin
                                                     Tampak Bangunan Sport Hall
           Camp C KM 5 ABIT
Page 103
                                        PENILAIAN PROPERTI
 LAMPIRAN                              PT FAJAR SAKTI PRIMA
FOTO OBJEK                             Objek Penilaian Berada di :
 PENILAIAN
                                 Jetty Muara Pahu, Kalimantan Timur.




  Tampak Bangunan Rumah Server Tower             Tampak Bangunan Warehouse Roller CHP
             Telkomsel T0                                     Tiga Unit




     Tampak Bangunan Bayan Mart                     Tampak Bangunan Control Room




      Tampak Bangunan Coal Lab                     Tampak Bangunan Sidedump Office
Page 104
                                        PENILAIAN PROPERTI
 LAMPIRAN                              PT FAJAR SAKTI PRIMA
FOTO OBJEK                             Objek Penilaian Berada di :
 PENILAIAN
                                 Jetty Muara Pahu, Kalimantan Timur.




  Tampak Bangunan Rumah Server Tower             Tampak Bangunan Warehouse Roller CHP
             Telkomsel T0                                     Tiga Unit




     Tampak Bangunan Bayan Mart                     Tampak Bangunan Control Room




      Tampak Bangunan Coal Lab                     Tampak Bangunan Sidedump Office
Page 105
                                                                      PENILAIAN PROPERTI
         LAMPIRAN                                                    PT FAJAR SAKTI PRIMA
        FOTO OBJEK                                                  Objek Penilaian Berada di :
         PENILAIAN
                                                             Jetty Muara Pahu, Kalimantan Timur.

                                                                                            Bukti Kepemilikan Hak Atas Tanah                     Luas
No                 Nama             Kode                          Lokasi                                                      Pemegang Hak
                                                                                                    (Register Camat)                             (m2)
      1 Mauran/Teri S           FSP-HR-017     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/055/SPPHAT/AGR/V/2020 Fajar Sakti Prima         6.960
      2 Jamli                   FSP-HR-016     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/063/SPPATN/XII/2017       Fajar Sakti Prima    30.277
      3 Baharin/Jamli           FSP-HR-098     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/012/SPPHAT/AGR/I/2021     Fajar Sakti Prima     1.627
      4 Jamli/Kepan             FSP-HR-016A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/168/SPPHAT/AGR/III/2021 Fajar Sakti Prima       4.620
      5 Cahyadi                 FSP-HR-015     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/013/SPPHAT/AGR/I/2019     Fajar Sakti Prima    18.000
      6 Jamrus-4                FSP-HR-190     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/038/SPPHAT/AGR/II/2021    Fajar Sakti Prima    15.365
      7 Baharin-1A              FSP-HR-087A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/057/SPPHAT/AGR/II/2021    Fajar Sakti Prima     2.341
      8 Jamrus                  FSP-HR-014     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/062/SPPATN/XII/2017       Fajar Sakti Prima    20.000
      9 Derta                   FSP-HR-094     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/013/SPPHAT/AGR/I/2021     Fajar Sakti Prima    20.021
     10 Benyamin-2              FSP-HR-163     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/049/SPPHAT/AGR/II/2021    Fajar Sakti Prima    51.569
     11 Joni                    FSP-HR-012     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/077/SPPATN/XII/2017       Fajar Sakti Prima    10.000
     12 Benyamin                FSP-HR-011     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/106/SPPHAT/AGR/X/2018     Fajar Sakti Prima     5.000
     13 Imawati                 FSP-HR-013     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/061/SPPATN/XII/2017       Fajar Sakti Prima    10.000
     14 Baharin                 FSP-HR-087     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/019/SPPHAT/AGR/I/2021     Fajar Sakti Prima    13.769
     15 Benyamin-2A             FSP-HR-163A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/048/SPPHAT/AGR/II/2021    Fajar Sakti Prima    13.838
     16 Norhana                 FSP-HR-162     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/138/SPPHAT/AGR/XI/2022 Fajar Sakti Prima        5.868
     17 Bustani                 FSP-HR-161     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/137/SPPHAT/AGR/XI/2022 Fajar Sakti Prima        2.878
     18 Mathius E (Ocom)        FSP-HR-169     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/036/SPPHAT/AGR/II/2021    Fajar Sakti Prima     9.474
     19 Baharin/Dimin           FSP-HR-018     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/018/SPPHAT/AGR/I/2021     Fajar Sakti Prima    10.080
     20 Supardi                 FSP-HR-089     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/171/SPPHAT/AGR/III/2021 Fajar Sakti Prima      27.755
     21 Eliati-2                FSP-HR-089A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/107/SPPHAT/AGR/XII/2023 Fajar Sakti Prima       2.555
     22 Jamrus-3                FSP-HR-058B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/040/SPPHAT/AGR/II/2021    Fajar Sakti Prima    10.000
     23 Jamrus-3A               FSP-HR-058C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/039/SPPHAT/AGR/II/2021    Fajar Sakti Prima    16.917
     24 Normah-1                FSP-HR-177     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/170/SPPHAT/AGR/III/2021 Fajar Sakti Prima       6.697
     25 Niju-1                  FSP-HR-009A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/248/SPPHAT/AGR/X/2020     Fajar Sakti Prima    10.848
     26 Niju                    FSP-HR-009     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/247/SPPHAT/AGR/X/2020     Fajar Sakti Prima     2.000
     27 Bacoq                   FSP-HR-002     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/105/SPPHAT/AGR/X/2018     Fajar Sakti Prima     3.685
     28 Laura                   FSP-HR-001     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/054/SPPHAT/AGR/VI/2020 Fajar Sakti Prima        4.842
     29 Niju-4                  FSP-HR-074A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/048/SPPHAT/AGR/II/2023    Fajar Sakti Prima    25.291
     30 Andi                    FSP-HR-074D    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/003/SPPHAT/AGR/I/2023     Fajar Sakti Prima     1.743
     31 Rumai                   FSP-HR-074     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/001/SPPHAT/AGR/I/2023     Fajar Sakti Prima     4.912
     32 Andi                    FSP-HR-074C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/002/SPPHAT/AGR/I/2023     Fajar Sakti Prima     1.540
     33 Niju-5                  FSP-HR-074B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/046/SPPHAT/AGR/II/2021    Fajar Sakti Prima     3.298
     34 Niju-5A                 FSP-HR-074B1   Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/045/SPPHAT/AGR/II/2021    Fajar Sakti Prima       802
     35 Majuerasih-3            FSP-HR-135     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/247/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       3.394
     36 Ramli                   FSP-HR-139     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/219/SPPHAT/AGR/V/2021 Fajar Sakti Prima         8.926
     37 Martinus Atma           FSP-HR-140     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/218/SPPHAT/AGR/V/2021 Fajar Sakti Prima         5.310
     38 Kulya Soma              FSP-HR-122     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/035/SPPHAT/AGR/II/2021    Fajar Sakti Prima     5.299
     39 Siti R                  FSP-HR-187B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/142/SPPHAT/AGR/XI/2022 Fajar Sakti Prima          256
     40 Isensyah/Lenawati       FSP-HR-189     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/034/SPPHAT/AGR/II/2021    Fajar Sakti Prima    16.402
     41 Norasikin               FSP-HR-187A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/141/SPPHAT/AGR/XI/2022 Fajar Sakti Prima        2.843
     42 Siti R                  FSP-HR-125     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/257/SPPHAT/AGR/V/2021 Fajar Sakti Prima        17.462
     43 Suryadi                 FSP-HR-175     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/139/SPPHAT/AGR/XI/2022 Fajar Sakti Prima        2.335
     44 Slamet                  FSP-HR-109     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/195/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        3.119
     45 Majuerasih-2            FSP-HR-111     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/052/SPPHAT/AGR/IV/2022 Fajar Sakti Prima        4.613
     46 Henderi-1               FSP-HR-179     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/288/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima      4.974
     47 Radius I                FSP-HR-149     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/136/SPPHAT/AGR/XI/2022 Fajar Sakti Prima        3.606
     48 Suding                  FSP-HR-176     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/140/SPPHAT/AGR/XI/2022 Fajar Sakti Prima          371
     49 Henderi-2               FSP-HR-183     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/289/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima      9.491
     50 Bison-1                 FSP-HR-106     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/054/SPPHAT/AGR/II/2021    Fajar Sakti Prima     8.524
     51 Suparjan                FSP-HR-108     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/033/SPPHAT/AGR/II/2021    Fajar Sakti Prima     3.530
     52 Baharin/Imawati         FSP-HR-105     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/230/SPPHAT/AGR/VI/2021 Fajar Sakti Prima       39.709
     53 Bison-1A                FSP-HR-106A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/053/SPPHAT/AGR/II/2021    Fajar Sakti Prima     4.205
     54 Naseh/Baharin           FSP-HR-107     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/204/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       12.931
     55 Rusli                   FSP-HR-076     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/257/SPPHAT/AGR/XI/2020 Fajar Sakti Prima       10.049
     56 Martinus                FSP-HR-005     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/141/SPPHAT/AGR/XII/2019 Fajar Sakti Prima      10.557
     57 Esra D/Ramajito (Alm)   FSP-HR-004     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/246/SPPHAT/AGR/X/2020     Fajar Sakti Prima    12.000
     58 Esra D/Ramajito (Alm)   FSP-HR-004A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/172/SPPHAT/AGR/III/2021 Fajar Sakti Prima      18.360
     59 Andi/Benyamin           FSP-HR-057     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/107/SPPHAT/AGR/X/2018     Fajar Sakti Prima     6.000
     60 Yeri-1                  FSP-HR-188     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/199/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       20.108
     61 Jamrus-2                FSP-HR-058     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/256/SPPHAT/AGR/XI/2020 Fajar Sakti Prima        3.808
     62 Niju-3                  FSP-HR-090     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/208/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        9.178
     63 Jamrus/Rumai            FSP-HR-090A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/240/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       5.954
     64 Jamrus-2A               FSP-HR-058A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/214/SPPHAT/AGR/V/2021 Fajar Sakti Prima        12.823
     65 Eliati-1                FSP-HR-057B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/106/SPPHAT/AGR/XII/2023 Fajar Sakti Prima      53.286
     66 Andi                    FSP-HR-057A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/043/SPPHAT/AGR/III/2020 Fajar Sakti Prima      40.000
     67 Lorensius/Yuliana       FSP-HR-007A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/029/SPPHAT/AGR/II/2020    Fajar Sakti Prima    29.157
     68 Lorensius/Yuliana       FSP-HR-007     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/030/SPPHAT/AGR/II/2020    Fajar Sakti Prima    12.565
     69 Norasikin               FSP-HR-006     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/142/SPPHAT/AGR/XII/2019 Fajar Sakti Prima      13.469
     70 Mirna S.Pd              FSP-HR-077     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/258/SPPHAT/AGR/XI/2020 Fajar Sakti Prima        4.713
Page 106
                                                                    PENILAIAN PROPERTI
      LAMPIRAN                                                     PT FAJAR SAKTI PRIMA
     FOTO OBJEK                                                   Objek Penilaian Berada di :
      PENILAIAN
                                                           Jetty Muara Pahu, Kalimantan Timur.

                                                                                          Bukti Kepemilikan Hak Atas Tanah                     Luas
No             Nama               Kode                          Lokasi                                                      Pemegang Hak
                                                                                                   (Register Camat)                            (m2)
  71 Jamrus                   FSP-HR-008A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/044/SPPHAT/AGR/III/2020 Fajar Sakti Prima       3.154
  72 Jamrus                   FSP-HR-008A1   Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/045/SPPHAT/AGR/III/2020 Fajar Sakti Prima       6.846
  73 Syahlihin-1              FSP-HR-008B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/252/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       4.464
  74 Meri-1                   FSP-HR-082     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/255/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       5.030
  75 Retsiayu P-1             FSP-HR-083     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/256/SPPHAT/AGR/VII/2021 Fajar Sakti Prima      70.360
  76 Retsiayu P-2/Herman      FSP-HR-083B    Kampung Abit, Kecamatan Mook Manaar Bulatn   Nomor tidak jelas                Fajar Sakti Prima    16.545
  77 Retsiayu P-1A            FSP-HR-083A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/257/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       4.806
  78 Baharin/Henilius         FSP-HR-095A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/051/SPPHAT/AGR/II/2021    Fajar Sakti Prima     6.822
  79 Baharin/Depi R           FSP-HR-097     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/011/SPPHAT/AGR/I/2021     Fajar Sakti Prima     3.299
  80 Ruslan/Bisker P          FSP-HR-164     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/174/SPPHAT/AGR/III/2021 Fajar Sakti Prima     123.175
  81 Yadi                     FSP-HR-158     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/232/SPPHAT/AGR/VI/2021 Fajar Sakti Prima        6.075
  82 Teti Susanti             FSP-HR-173     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/223/SPPHAT/AGR/V/2021 Fajar Sakti Prima        25.258
  83 Yohana K                 FSP-HR-182     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/050/SPPHAT/AGR/IV/2022 Fajar Sakti Prima       19.662
  84 Yohana K                 FSP-HR-174     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/294/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima     10.000
  85 Hema I                   FSP-HR-174A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/431/SPPHAT/AGR/X/2021     Fajar Sakti Prima     5.175
  86 Sepe Martinus-3          FSP-HR-101     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/427/SPPHAT/AGR/X/2021     Fajar Sakti Prima    35.759
  87 Sriyanti-3/Anuar         FSP-HR-180     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/285/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima      3.430
  88 Majuerasih-1/Erna        FSP-HR-110     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/169/SPPHAT/AGR/III/2021 Fajar Sakti Prima       3.811
  89 Sepe Martinus-2          FSP-HR-100     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/426/SPPHAT/AGR/X/2021     Fajar Sakti Prima     4.383
  90 Sepe Martinus-1A         FSP-HR-099A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/425/SPPHAT/AGR/X/2021     Fajar Sakti Prima       516
  91 Sepe Martinus-1          FSP-HR-099     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/424/SPPHAT/AGR/X/2021     Fajar Sakti Prima    11.930
  92 Teri S/Edison            FSP-HR-172     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/013/SPPHAT/AGR/II/2022    Fajar Sakti Prima    17.489
  93 Sriyanti/Anuar           FSP-HR-104     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/286/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima      6.291
  94 Nordiana Depi R/Ruslan   FSP-HR-085A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/055/SPPHAT/AGR/II/2021    Fajar Sakti Prima     6.434
  95 Baharin/Henilius         FSP-HR-095     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/050/SPPHAT/AGR/II/2021    Fajar Sakti Prima    12.037
  96 Depi R/Ruslan            FSP-HR-085     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/056/SPPHAT/AGR/II/2021    Fajar Sakti Prima    12.327
  97 Sepe Martinus            FSP-HR-024     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/032/SPPHAT/AGR/II/2020    Fajar Sakti Prima    46.117
  98 Sepe Martinus            FSP-HR-024A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/031/SPPHAT/AGR/II/2020    Fajar Sakti Prima    60.470
  99 Cuninan                  FSP-HR-022     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/061/SPPHAT/AGR/VI/2020 Fajar Sakti Prima        3.505
 100 Cuninan-1                FSP-HR-022A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/062/SPPHAT/AGR/VI/2020 Fajar Sakti Prima        6.495
 101 Niju-2                   FSP-HR-078     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/255/SPPHAT/AGR/XI/2020 Fajar Sakti Prima       44.156
 102 Krisyanto (Lider)        FSP-HR-023A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/253/SPPHAT/AGR/XI/2020 Fajar Sakti Prima       14.799
 103 Krisyanto (Lider)        FSP-HR-023     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/252/SPPHAT/AGR/XI/2020 Fajar Sakti Prima       17.350
 104 Meri                     FSP-HR-021     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/143/SPPHAT/AGR/XII/2019 Fajar Sakti Prima      19.447
 105 Syahlihin                FSP-HR-008     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/245/SPPHAT/AGR/X/2020     Fajar Sakti Prima    27.801
 106 Syahlihin-2              FSP-HR-008C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/250/SPPHAT/AGR/VII/2021 Fajar Sakti Prima      54.521
 107 Rusiani                  FSP-HR-008D    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/206/SPPHAT/AGR/V/2021 Fajar Sakti Prima        54.521
 108 Nadus                    FSP-HR-069     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/224/SPPHAT/AGR/V/2021 Fajar Sakti Prima        81.156
 109 Henilius                 FSP-HR-071     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/261/SPPHAT/AGR/VII/2021 Fajar Sakti Prima      10.000
 110 Sepe Maritinus-3A        FSP-HR-101     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/427/SPPHAT/AGR/X/2021     Fajar Sakti Prima    35.759
 111 Tasih/Aniah/Rusmansyah   FSP-HR-150     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/291/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima     10.000
 112 Sanis                    FSP-HR-144     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/108/SPPHAT/AGR/XII/2023 Fajar Sakti Prima      17.343
 113 Marta Tiana              FSP-HR-022D    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/184/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       10.000
 114 Cuniman-3                FSP-HR-022C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/052/SPPHAT/AGR/II/2021    Fajar Sakti Prima    17.308
 115 Syahlihin                FSP-HR-069B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/253/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       3.817
 116 Nadus-1/Sudirmansyah     FSP-HR-069A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/225/SPPHAT/AGR/V/2021 Fajar Sakti Prima        83.649
 117 Bustani                  FSP-HR-080     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/196/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       22.480
 118 Aniah/Mira               FSP-HR-070     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/194/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       78.952
 119 Nekis                    FSP-HR-212     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/051/SPPHAT/AGR/IV/2022 Fajar Sakti Prima        4.244
 120 Bebi S/Norani            FSP-HR-079     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/259/SPPHAT/AGR/XI/2020 Fajar Sakti Prima       74.879
 121 Cuniman-2                FSP-HR-022B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/254/SPPHAT/AGR/XI/2020 Fajar Sakti Prima       72.526
 122 Guntur                   FSP-HR-027     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/013/SPPHAT/AGR/I/2020     Fajar Sakti Prima     6.745
 123 Belisius-1               FSP-HR-029     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/046/SPPHAT/AGR/III/2020 Fajar Sakti Prima       8.765
 124 Imawati                  FSP-HR-028     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/064/SPPATN/XII/2017       Fajar Sakti Prima    26.400
 125 Belisius-2               FSP-HR-029C2   Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/047/SPPHAT/AGR/III/2020 Fajar Sakti Prima       6.235
 126 Supriyanto               FSP-HR-029A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/065/SPPATN/XII/2017       Fajar Sakti Prima    10.000
 127 Nordiana/Risan/Dayan     FSP-HR-153     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/201/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       39.566
 128 Maskur                   FSP-HR-115A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/189/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        1.824
 129 Maskur                   FSP-HR-115     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/188/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        9.216
 130 Rusmini Betty            FSP-HR-115C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/428/SPPHAT/AGR/X/2021     Fajar Sakti Prima     6.161
 131 Thamran-2                FSP-HR-123     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/199/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        5.644
 132 Jonis Niko               FSP-HR-102     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/015/SPPHAT/AGR/I/2021     Fajar Sakti Prima    17.258
 133 Sarah/Yuniar E           FSP-HR-102A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/292/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima      6.249
 134 Anuar                    FSP-HR-103     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/287/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima     61.462
 135 Suasin-1A                FSP-HR-092A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/186/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        1.314
 136 Suasin-1C                FSP-HR-092C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/290/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima      1.439
 137 Suasin-1                 FSP-HR-092     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/009/SPPHAT/AGR/I/2021     Fajar Sakti Prima    10.000
 138 Suasin-1B                FSP-HR-092B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/187/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        1.417
 139 Sudirmansyah-1           FSP-HR-025A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/227/SPPHAT/AGR/V/2021 Fajar Sakti Prima         1.328
 140 Sudirmansyah             FSP-HR-025     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/228/SPPHAT/AGR/V/2021 Fajar Sakti Prima        14.078
Page 107
                                                                  PENILAIAN PROPERTI
      LAMPIRAN                                                   PT FAJAR SAKTI PRIMA
     FOTO OBJEK                                                 Objek Penilaian Berada di :
      PENILAIAN
                                                         Jetty Muara Pahu, Kalimantan Timur.

                                                                                        Bukti Kepemilikan Hak Atas Tanah                     Luas
No              Nama            Kode                          Lokasi                                                      Pemegang Hak
                                                                                                (Register Camat)                             (m2)
 141 Depi R/Ruslan          FSP-HR-154     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/203/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       20.602
 142 Ruslan/Anuar           FSP-HR-029B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/144/SPPHAT/AGR/XII/2019 Fajar Sakti Prima      10.000
 143 Thamran                FSP-HR-029C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/014/SPPHAT/AGR/I/2020     Fajar Sakti Prima    10.000
 144 Thamran                FSP-HR-029C1   Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/200/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       37.388
 145 Maskur                 FSP-HR-081     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/248/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       2.414
 146 Rahman E3              FSP-HR-091C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/436/SPPHAT/AGR/XI/2021 Fajar Sakti Prima        3.605
 147 Rahman E2              FSP-HR-091B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/240/SPPHAT/AGR/VI/2021 Fajar Sakti Prima        3.484
 148 Rahman E               FSP-HR-091     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/008/SPPHAT/AGR/I/2021     Fajar Sakti Prima    20.000
 149 Rahman E1              FSP-HR-091A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/185/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        3.029
 150 Hairin                 FSP-HR-197     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/238/SPPHAT/AGR/VI/2021 Fajar Sakti Prima       14.530
 151 Rusdinawati            FSP-HR-117A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/231/SPPHAT/AGR/VI/2021 Fajar Sakti Prima        5.744
 152 Rusdinawati            FSP-HR-117     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/197/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       30.000
 153 Mardinawati            FSP-HR-118     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/202/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        5.845
 154 Hairin                 FSP-HR-137     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/198/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       20.000
 155 Hairin                 FSP-HR-137A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/234/SPPHAT/AGR/VI/2021 Fajar Sakti Prima       32.512
 156 Hairin                 FSP-HR-030     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/016/SPPHAT/AGR/I/2020     Fajar Sakti Prima    15.000
 157 Mulyadi                FSP-HR-146     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/053/SPPHAT/AGR/IV/2022 Fajar Sakti Prima        2.000
 158 Siti Kustaniah         FSP-HR-196     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/236/SPPHAT/AGR/VI/2021 Fajar Sakti Prima       19.721
 159 Gusti A/Padlan         FSP-HR-198     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/239/SPPHAT/AGR/VI/2021 Fajar Sakti Prima       14.530
 160 Padlan                 FSP-HR-031     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/015/SPPHAT/AGR/I/2020     Fajar Sakti Prima    13.806
 161 Hairin/Surimansyah     FSP-HR-059     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/053/SPPHAT/AGR/VI/2020 Fajar Sakti Prima      120.851
 162 Anisa (Yenis)          FSP-HR-199     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/237/SPPHAT/AGR/VI/2021 Fajar Sakti Prima       23.148
 163 Soniansyah/Siranah     FSP-HR-145     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/220/SPPHAT/AGR/V/2021 Fajar Sakti Prima        27.460
 164 Mardiana/Antonius      FSP-HR-120     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/047/SPPHAT/AGR/II/2021    Fajar Sakti Prima     3.967
 165 Effendi, SH/Subardin   FSP-HR-138     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/429/SPPHAT/AGR/X/2021     Fajar Sakti Prima    15.807
 166 Antonius               FSP-HR-120A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/439/SPPHAT/AGR/XI/2021 Fajar Sakti Prima          931
 167 Masril                 FSP-HR-129     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/016/SPPHAT/AGR/I/2021     Fajar Sakti Prima    14.168
 168 Masril                 FSP-HR-129A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/246/SPPHAT/AGR/VII/2021 Fajar Sakti Prima      18.885
 169 Thomas/Nirum           FSP-HR-131     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/184/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       15.237
 170 Thomas/Nirum           FSP-HR-131A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/245/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       7.293
 171 Adriani                FSP-HR-032     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/066/SPPATN/XII/2017       Fajar Sakti Prima    35.085
 172 Adriani                FSP-HR-032B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/018/SPPHAT/AGR/II/2020    Fajar Sakti Prima   142.924
 173 Adriani-1              FSP-HR-032C    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/033/SPPHAT/AGR/II/2020    Fajar Sakti Prima    90.892
 174 Darmi                  FSP-HR-065     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/050/SPPHAT/AGR/VI/2020 Fajar Sakti Prima       33.270
 175 Taria                  FSP-HR-033     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/011/SPPHAT/AGR/I/2020     Fajar Sakti Prima     1.992
 176 Rahman E               FSP-HR-032A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/079/SPPATN/XII/2017       Fajar Sakti Prima    10.000
 177 Effendi, SH/Subardin   FSP-HR-138A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/430/SPPHAT/AGR/X/2021     Fajar Sakti Prima    13.591
 178 Radius Nemar P         FSP-HR-132     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/017/SPPHAT/AGR/I/2021     Fajar Sakti Prima    17.356
 179 Thomas Edison          FSP-HR-132B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/032/SPPHAT/AGR/II/2021    Fajar Sakti Prima    14.749
 180 Latina                 FSP-HR-132A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/031/SPPHAT/AGR/II/2021    Fajar Sakti Prima     6.776
 181 Thomas Edison          FSP-HR-134A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/438/SPPHAT/AGR/XI/2021 Fajar Sakti Prima        9.605
 182 Ethelinda              FSP-HR-134     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/015/SPPHAT/AGR/II/2022    Fajar Sakti Prima    15.529
 183 Syalihin               FSP-HR-157     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/251/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       6.649
 184 Yohana K               FSP-HR-157B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/222/SPPHAT/AGR/V/2021 Fajar Sakti Prima         4.902
 185 Suriansyah             FSP-HR-157A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/221/SPPHAT/AGR/V/2021 Fajar Sakti Prima         6.915
 186 Hairin                 FSP-HR-156     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/314/SPPHAT/AGR/IX/2021 Fajar Sakti Prima       20.056
 187 Taria-1                FSP-HR-033A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/012/SPPHAT/AGR/I/2020     Fajar Sakti Prima     5.000
 188 Masril                 FSP-HR-034     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/067/SPPATN/XII/2017       Fajar Sakti Prima    24.346
 189 Mardiana               FSP-HR-035     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/068/SPPATN/XII/2017       Fajar Sakti Prima     5.000
 190 Taria-1A               FSP-HR-033B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/021/SPPHAT/AGR/II/2020    Fajar Sakti Prima    24.307
 191 Maryono                FSP-HR-036     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/069/SPPATN/XII/2017       Fajar Sakti Prima     5.007
 192 Maryono-1              FSP-HR-036A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/070/SPPATN/XII/2017       Fajar Sakti Prima     4.993
 193 Mardiana-1             FSP-HR-035A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/028/SPPHAT/AGR/II/2020    Fajar Sakti Prima    10.498
 194 Suriansyah             FSP-HR-066     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/051/SPPHAT/AGR/VI/2020 Fajar Sakti Prima       44.852
 195 Padlan                 FSP-HR-066A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/052/SPPHAT/AGR/VI/2020 Fajar Sakti Prima       10.000
 196 Rusdinawati            FSP-HR-040     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/041/SPPHAT/AGR/II/2020    Fajar Sakti Prima    20.513
 197 Rahman E               FSP-HR-068     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/060/SPPHAT/AGR/VI/2020 Fajar Sakti Prima       20.391
 198 Ebit/Rupina            FSP-HR-039A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/037/SPPHAT/AGR/II/2020    Fajar Sakti Prima    10.380
 199 Rupina                 FSP-HR-039     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/019/SPPHAT/AGR/II/2020    Fajar Sakti Prima    10.991
 200 Suansin                FSP-HR-038     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/035/SPPHAT/AGR/II/2020    Fajar Sakti Prima    17.434
 201 Rahman E/Suansin       FSP-HR-037     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/071/SPPATN/XII/2017       Fajar Sakti Prima    17.700
 202 Mardiana-2             FSP-HR-035B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/034/SPPHAT/AGR/II/2020    Fajar Sakti Prima    10.003
 203 Suansin-1              FSP-HR-038A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/036/SPPHAT/AGR/II/2020    Fajar Sakti Prima    15.311
 204 Heryo-1/M. Mastur      FSP-HR-041A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/057/SPPHAT/AGR/VI/2020 Fajar Sakti Prima       10.274
 205 Heryo /M. Mastur       FSP-HR-041     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/056/SPPHAT/AGR/VI/2020 Fajar Sakti Prima       10.028
 206 Heryo-2 /M. Mastur     FSP-HR-041B    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/058/SPPHAT/AGR/VI/2020 Fajar Sakti Prima        5.490
 207 Yohana K/Suriansyah    FSP-HR-156A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/315/SPPHAT/AGR/IX/2021 Fajar Sakti Prima        6.000
 208 Yohana K               FSP-HR-201     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/293/SPPHAT/AGR/VIII/2021 Fajar Sakti Prima      3.211
 209 Guntur                 FSP-HR-160A    Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/254/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       4.597
 210 Thomas/Winansyih       FSP-HR-160     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/259/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       2.298
Page 108
                                                                         PENILAIAN PROPERTI
      LAMPIRAN                                                          PT FAJAR SAKTI PRIMA
     FOTO OBJEK                                                        Objek Penilaian Berada di :
      PENILAIAN
                                                                Jetty Muara Pahu, Kalimantan Timur.

                                                                                                Bukti Kepemilikan Hak Atas Tanah                     Luas
No              Nama                  Kode                           Lokasi                                                       Pemegang Hak
                                                                                                        (Register Camat)                             (m2)
 211 Juriansyah                     FSP-HR-202     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/437/SPPHAT/AGR/XI/2021 Fajar Sakti Prima        9.231
 212 Thomas/Winansyih               FSP-HR-184A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/260/SPPHAT/AGR/VII/2021 Fajar Sakti Prima       2.500
 213 Hasan-1                        FSP-HR-184     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/313/SPPHAT/AGR/IX/2021 Fajar Sakti Prima       22.723
 214 Hasan-2                        FSP-HR-184B Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/313/SPPHAT/AGR/IX/2021 Fajar Sakti Prima        2.306
 215 Mulyadi/Baharin                FSP-HR-147     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/262/SPPHAT/AGR/VII/2021 Fajar Sakti Prima      15.790
 216 Suriansyah                     FSP-HR-185A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/202/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        3.082
 217 Baharin/Guntur                 FSP-HR-185     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/235/SPPHAT/AGR/VI/2021 Fajar Sakti Prima       27.747
 218 Suriansyah                     FSP-HR-159     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/176/SPPHAT/AGR/III/2021 Fajar Sakti Prima      18.652
 219 Baharin                        FSP-HR-096     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/010/SPPHAT/AGR/I/2021     Fajar Sakti Prima    32.541
 220 Baharin/Bison                  FSP-HR-168     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/039/SPPHAT/AGR/II/2021    Fajar Sakti Prima    18.652
 221 Asip                           FSP-HR-042     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/072/SPPATN/XII/2017       Fajar Sakti Prima    10.028
 222 Masril                         FSP-HR-043     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/073/SPPATN/XII/2017       Fajar Sakti Prima    10.028
 223 Samson                         FSP-HR-044     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/074/SPPATN/XII/2017       Fajar Sakti Prima     8.000
 224 Ruslan                         FSP-HR-045     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/075/SPPATN/XII/2017       Fajar Sakti Prima    10.000
 225 Hema Indriyani                 FSP-HR-046     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/076/SPPATN/XII/2017       Fajar Sakti Prima     8.000
 226 Rahman E                       FSP-HR-047     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/078/SPPATN/XII/2017       Fajar Sakti Prima     5.000
 227 Sulam Peri                     FSP-HR-048     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/066/SPPHAT/AGR/VIII/2020 Fajar Sakti Prima      7.051
 228 Ermansyah                      FSP-HR-048A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/067/SPPHAT/AGR/VIII/2020 Fajar Sakti Prima      7.532
 229 Suding-1                       FSP-HR-049     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/065/SPPHAT/AGR/VII/2020 Fajar Sakti Prima       2.811
 230 Sudirmansyah                   FSP-HR-048B Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/249/SPPHAT/AGR/X/2020     Fajar Sakti Prima       789
 231 Isensyah                       FSP-HR-050     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/016/SPPHAT/AGR/I/2019     Fajar Sakti Prima     5.000
 232 Siti R/Norasikin               FSP-HR-050A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/015/SPPHAT/AGR/I/2019     Fajar Sakti Prima     5.000
 233 Norian                         FSP-HR-052     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/012/SPPHAT/AGR/I/2019     Fajar Sakti Prima    10.528
 234 Musip                          FSP-HR-051     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/014/SPPHAT/AGR/I/2019     Fajar Sakti Prima    12.256
 235 Rusdinawati/Riyut (Alm)        FSP-HR-053B Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/031/SPPHAT/AGR/III/2019 Fajar Sakti Prima      13.107
 236 Rusdinawati/Riyut (Alm)        FSP-HR-053A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/030/SPPHAT/AGR/III/2019 Fajar Sakti Prima      12.057
 237 Rusdinawati/Riyut (Alm)        FSP-HR-053     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/065/SPPHAT/VIII/2018      Fajar Sakti Prima    25.019
 238 Simon P/Kusnadi                FSP-HR-061     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/042/SPPHAT/AGR/II/2020    Fajar Sakti Prima    42.202
 239 Juriansyah/Bison               FSP-HR-054     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/036/SPPHAT/AGR/IV/2019 Fajar Sakti Prima       13.191
 240 Edimansyah                     FSP-HR-054A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/035/SPPHAT/AGR/IV/2019 Fajar Sakti Prima       17.891
 241 Baharin                        FSP-HR-060B Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/040/SPPHAT/AGR/II/2020    Fajar Sakti Prima     8.353
 242 Jerki                          FSP-HR-060     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/038/SPPHAT/AGR/II/2020    Fajar Sakti Prima    40.000
 243 Neki                           FSP-HR-060A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/039/SPPHAT/AGR/II/2020    Fajar Sakti Prima    40.000
 244 Edimansyah-1                   FSP-HR-054B Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/048/SPPHAT/AGR/III/2020 Fajar Sakti Prima      19.363
 245 Suding-2                       FSP-HR-055     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/099/SPPHAT/AGR/XI/2019 Fajar Sakti Prima       45.000
 246 Suding-2A                      FSP-HR-055A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/064/SPPHAT/AGR/VII/2020 Fajar Sakti Prima      77.564
 247 Edimansyah-2                   FSP-HR-054C Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/049/SPPHAT/AGR/III/2020 Fajar Sakti Prima      25.297
 248 Soleha/Rusmansyah              FSP-HR-167A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/177/SPPHAT/AGR/III/2021 Fajar Sakti Prima      10.445
 249 Baharin-01A                    FSP-HR-192A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/214/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       39.662
 250 Baharin/Suryadi                FSP-HR-193     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/215/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       66.554
 251 Baharin/Asrani                 FSP-HR-195     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/212/SPPHAT/AGR/IV/2021 Fajar Sakti Prima        5.533
 252 Baharin/Rusman                 FSP-HR-194     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/211/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       25.291
 253 Suriansyah-6                   FSP-HR-209     Kampung Sebelang, Kecamatan Muara Pahu       593/005/PEM-MP/VIII/2021         Fajar Sakti Prima    12.684
 254 Suriansyah-5                   FSP-HR-208     Kampung Sebelang, Kecamatan Muara Pahu       593/004/PEM-MP/VIII/2021         Fajar Sakti Prima    18.172
 255 Rusmansyah/Soleha              FSP-HR-167     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/014/SPPHAT/AGR/I/2021     Fajar Sakti Prima    23.354
 256 Baharin-01                     FSP-HR-192     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/213/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       25.379
 257 Baharin CS                     FSP-HR-073A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/216/SPPHAT/AGR/V/2021 Fajar Sakti Prima        32.561
 258 Sepe Martinus-4                FSP-HR-073     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/205/SPPHAT/AGR/IV/2021 Fajar Sakti Prima      100.000
 259 Baharin                        FSP-HR-056     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/081/SPPHAT/AGR/X/2019     Fajar Sakti Prima    95.000
 260 Sepe Martinus-3                FSP-HR-072     Kampung Abit, Kecamatan Mook Manaar Bulatn   593.21/206/SPPHAT/AGR/IV/2021 Fajar Sakti Prima       60.000
 261 Baharin CS                     FSP-HR-073B Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/215/SPPHAT/AGR/V/2021 Fajar Sakti Prima        17.439
 262 Adriani                        FSP-HR-056A Kampung Abit, Kecamatan Mook Manaar Bulatn      593.21/037/SPPHAT/AGR/IV/2019 Fajar Sakti Prima        9.477
 263 Adriani                        FSP-HR-056B Kampung Sebelang, Kecamatan Muara Pahu          593/026/PEM-MP/XI/2019           Fajar Sakti Prima     8.779
 264 Kusnadi                        FSP-HR-056C Kampung Sebelang, Kecamatan Muara Pahu          593/023/PEM-MP/X/2019            Fajar Sakti Prima    20.000
 265 Pidlan                         FSP-HR-056C-1 Kampung Sebelang, Kecamatan Muara Pahu        593/024/PEM-MP/X/2019            Fajar Sakti Prima    20.000
 266 Suriansyah, Syahlihin, Maskur, Sawang,
                                    FSP-HR-205
                                            Rodimansyah,
                                                   Kampung
                                                         Ronanusdin/Hendro
                                                            Sebelang, Kecamatan Muara Pahu      593/001/PEM-MP/VIII/2021         Fajar Sakti Prima    85.056
 267 M Ali Zain Noor                FSP-HR-056C-2 Kampung Sebelang, Kecamatan Muara Pahu        593/025/PEM-MP/X/2019            Fajar Sakti Prima    21.221
 268 Sawang/Suriansyah              FSP-HR-207     Kampung Sebelang, Kecamatan Muara Pahu       593/003/PEM-MP/VIII/2021         Fajar Sakti Prima     9.677
 269 Suriansyah-4                   FSP-HR-206     Kampung Sebelang, Kecamatan Muara Pahu       593/002/PEM-MP/VIII/2021         Fajar Sakti Prima    74.003
 270 M Ali Zain Noor                FSP-JT-043I    Kampung Sebelang, Kecamatan Muara Pahu       593.3/45/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 271 M Ali Zain Noor                FSP-JT-043     Kampung Sebelang, Kecamatan Muara Pahu       593.3/36/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 272 Kusnadi                        FSP-JT-043A    Kampung Sebelang, Kecamatan Muara Pahu       593.3/37/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 273 Jumli                          FSP-JT-043B    Kampung Sebelang, Kecamatan Muara Pahu       593.3/38/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 274 Pidlan                         FSP-JT-043C    Kampung Sebelang, Kecamatan Muara Pahu       593.3/39/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 275 Nasjur                         FSP-JT-043D    Kampung Sebelang, Kecamatan Muara Pahu       593.3/40/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 276 M Ali Zain Noor                FSP-JT-043E    Kampung Sebelang, Kecamatan Muara Pahu       593.3/41/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 277 Hajeli                         FSP-JT-043F    Kampung Sebelang, Kecamatan Muara Pahu       593.3/42/PEM-MP/VII/2018         Fajar Sakti Prima   150.000
 278 Ardiansyah/Hidayat S           FSP-JT-012     Kampung Sebelang, Kecamatan Muara Pahu       593/05/PEM-MP/II/2018            Fajar Sakti Prima    12.596
 279 Miril-1                        FSP-JT-011     Kampung Sebelang, Kecamatan Muara Pahu       593/04/PEM-MP/II/2018            Fajar Sakti Prima    22.337
 280 Miril-2                        FSP-JT-024     Kampung Sebelang, Kecamatan Muara Pahu       593/34/PEM-MP/V/2018             Fajar Sakti Prima    14.152
Page 109
                                                                        PENILAIAN PROPERTI
      LAMPIRAN                                                         PT FAJAR SAKTI PRIMA
     FOTO OBJEK                                                       Objek Penilaian Berada di :
      PENILAIAN
                                                              Jetty Muara Pahu, Kalimantan Timur.

                                                                                               Bukti Kepemilikan Hak Atas Tanah                       Luas
No              Nama                   Kode                         Lokasi                                                       Pemegang Hak
                                                                                                       (Register Camat)                               (m2)
 281 Jumran                        FSP-JT-010    Kampung Sebelang, Kecamatan Muara Pahu        593/07/PEM-MP/II/2018            Fajar Sakti Prima      15.306
 282 Asriansyah/Sufian             FSP-JT-009    Kampung Sebelang, Kecamatan Muara Pahu        593.3/26/PEM-MP/IV/2018          Fajar Sakti Prima      80.000
 283 Bahterin                      FSP-JT-007    Kampung Sebelang, Kecamatan Muara Pahu        593/06/PEM-MP/II/2018            Fajar Sakti Prima      12.386
 284 Asriansyah                    FSP-JT-008    Kampung Sebelang, Kecamatan Muara Pahu        593/03/PEM-MP/II/2018            Fajar Sakti Prima       5.898
 285 Kasdi                         FSP-JT-006    Kampung Sebelang, Kecamatan Muara Pahu        593/10/PEM-MP/II/2018            Fajar Sakti Prima       4.648
 286 Kusnadi                       FSP-JT-043H   Kampung Sebelang, Kecamatan Muara Pahu        593.3/44/PEM-MP/VII/2018         Fajar Sakti Prima      40.956
 287 S. Muhtadin                   FSP-JT-005    Kampung Sebelang, Kecamatan Muara Pahu        593/22/PEM-MP/IV/2018            Fajar Sakti Prima       8.884
 288 Aidi Yusuf/H. Gone            FSP-JT-004A   Kampung Sebelang, Kecamatan Muara Pahu        593/21/PEM-MP/IV/2018            Fajar Sakti Prima      25.944
 289 Hajeli                        FSP-JT-004    Kampung Sebelang, Kecamatan Muara Pahu        593/19/PEM-MP/III/2018           Fajar Sakti Prima      35.000
 290 Hanisa                        FSP-JT-003V   Kampung Sebelang, Kecamatan Muara Pahu        593.3/037/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 291 Ardiani Efendi                FSP-JT-003U   Kampung Sebelang, Kecamatan Muara Pahu        593.3/036/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 292 Lendra Rahmadani              FSP-JT-003T   Kampung Sebelang, Kecamatan Muara Pahu        593.3/035/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 293 Raudatul Wahidah              FSP-JT-003S   Kampung Sebelang, Kecamatan Muara Pahu        593.3/035/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 294 Susila Wati                   FSP-JT-003R   Kampung Sebelang, Kecamatan Muara Pahu        593.3/033/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 295 Auvi Satani                   FSP-JT-003Q   Kampung Sebelang, Kecamatan Muara Pahu        593.3/032/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 296 Agusiah                       FSP-JT-003P   Kampung Sebelang, Kecamatan Muara Pahu        593.3/031/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 297 Nanang Supian                 FSP-JT-003O   Kampung Sebelang, Kecamatan Muara Pahu        593.3/030/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 298 Kusuma Wati                   FSP-JT-003N   Kampung Sebelang, Kecamatan Muara Pahu        593.3/029/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 299 Akhmad                        FSP-JT-003M   Kampung Sebelang, Kecamatan Muara Pahu        593.3/028/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 300 Jumanti                       FSP-JT-003L   Kampung Sebelang, Kecamatan Muara Pahu        593.3/027/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 301 Rasid Rakhman-4               FSP-JT-003K   Kampung Sebelang, Kecamatan Muara Pahu        593.3/026/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 302 Rasid Rakhman-3               FSP-JT-003J   Kampung Sebelang, Kecamatan Muara Pahu        593.3/025/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 303 Rasid Rakhman-2               FSP-JT-003I   Kampung Sebelang, Kecamatan Muara Pahu        593.3/024/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 304 Rasid Rakhman-1               FSP-JT-003H   Kampung Sebelang, Kecamatan Muara Pahu        593.3/023/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 305 H. Asmuni Syukur-1 (H. Gone) FSP-JT-003     Kampung Sebelang, Kecamatan Muara Pahu        593.3/015/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 306 H. Asmuni Syukur-2 (H. Gone) FSP-JT-003A    Kampung Sebelang, Kecamatan Muara Pahu        593.3/016/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 307 H. Asmuni Syukur-3 (H. Gone) FSP-JT-003B    Kampung Sebelang, Kecamatan Muara Pahu        593.3/017/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 308 H. Asmuni Syukur-4 (H. Gone) FSP-JT-003C    Kampung Sebelang, Kecamatan Muara Pahu        593.3/018/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 309 Rafiah                        FSP-JT-003D   Kampung Sebelang, Kecamatan Muara Pahu        593.3/019/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 310 Lailatul Kadariah             FSP-JT-003E   Kampung Sebelang, Kecamatan Muara Pahu        593.3/020/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 311 Nurul                         FSP-JT-003F   Kampung Sebelang, Kecamatan Muara Pahu        593.3/021/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 312 Jumri                         FSP-JT-003G   Kampung Sebelang, Kecamatan Muara Pahu        593.3/022/PEM-MP/XI/2017         Fajar Sakti Prima      97.826
 313 H. Ermiwati/Ruskadran J (Alm) FSP-JT-002    Kampung Sebelang, Kecamatan Muara Pahu        593.3/08/PEM-MP/II/2018          Fajar Sakti Prima      95.250
 314 H. Ermiwati/Ruskadran J (Alm) FSP-JT-002A   Kampung Sebelang, Kecamatan Muara Pahu        593.3/09/PEM-MP/II/2018          Fajar Sakti Prima      95.250
 315 Suryanto/Khairul Shaleh M.S FSP-JT-001      Kampung Sebelang, Kecamatan Muara Pahu        593/31/PEM-MP/V/2018             Fajar Sakti Prima      31.107
 316 Sri W/Khairul Shaleh M.S      FSP-JT-001A   Kampung Sebelang, Kecamatan Muara Pahu        593/32/PEM-MP/V/2018             Fajar Sakti Prima      31.107
 317 Arbaenah/Khairul Shaleh M.S FSP-JT-001B     Kampung Sebelang, Kecamatan Muara Pahu        593/33/PEM-MP/V/2018             Fajar Sakti Prima      31.107
 318 Baco-1/Jamaiah                FSP-JT-013    Kampung Sebelang, Kecamatan Muara Pahu        593.3/24/PEM-MP/IX/2018          Fajar Sakti Prima      38.400
 319 Hajeli-1                      FSP-JT-014    Kampung Sebelang, Kecamatan Muara Pahu        593/13/PEM-MP/III/2018           Fajar Sakti Prima      68.850
 320 Hajeli-2                      FSP-JT-014A   Kampung Sebelang, Kecamatan Muara Pahu        593/14/PEM-MP/III/2018           Fajar Sakti Prima      11.900
 321 Basyir-1                      FSP-JT-015    Kampung Sebelang, Kecamatan Muara Pahu        593/12/PEM-MP/III/2018           Fajar Sakti Prima      16.354
 322 Hamran Alias Yon              FSP-JT-017A   Kampung Sebelang, Kecamatan Muara Pahu        593/17/PEM-MP/III/2018           Fajar Sakti Prima      26.775
 323 Aziz Maulana                  FSP-JT-017    Kampung Sebelang, Kecamatan Muara Pahu        593/18/PEM-MP/III/2018           Fajar Sakti Prima      14.900
 324 Baco-12/Jamaiah               FSP-JT-021    Kampung Sebelang, Kecamatan Muara Pahu        593.3/25/PEM-MP/IV/2018          Fajar Sakti Prima      13.000
 325 Supiansyah/Yulyanti/Yunus (Alm)
                                   FSP-JT-016    Kampung Sebelang, Kecamatan Muara Pahu        593/20/PEM-MP/IV/2018            Fajar Sakti Prima      40.000
 326 Jamudin                       FSP-JT-022    Kampung Sebelang, Kecamatan Muara Pahu        593/16/PEM-MP/III/2018           Fajar Sakti Prima      27.560
 327 Hendri                        FSP-JT-018    Kampung Sebelang, Kecamatan Muara Pahu        593/15/PEM-MP/III/2018           Fajar Sakti Prima      47.880
 328 Basyir-2                      FSP-JT-019    Kampung Sebelang, Kecamatan Muara Pahu        593/10/PEM-MP/III/2018           Fajar Sakti Prima      47.880
 329 Baco/Samran                   FSP-JT-020    Kampung Sebelang, Kecamatan Muara Pahu        593/23/PEM-MP/IX/2018            Fajar Sakti Prima      32.500
 330 Suryansyah                    FSP-JT-023    Kampung Sebelang, Kecamatan Muara Pahu        593/29/PEM-MP/V/2018             Fajar Sakti Prima     100.000
 331 Rekky Surya Winarta           FSP-JT-023A   Kampung Sebelang, Kecamatan Muara Pahu        593/30/PEM-MP/V/2018             Fajar Sakti Prima     100.000
 332 Jumli                         FSP-JT-043G   Kampung Sebelang, Kecamatan Muara Pahu        593.3/38/PEM-MP/VII/2018         Fajar Sakti Prima     167.574
 333 Kusnadi                       FSP-JT-043J   Kampung Sebelang, Kecamatan Muara Pahu        593.3/46/PEM-MP/VII/2018         Fajar Sakti Prima     140.000
 334 Aziz Maulana-1                FSP-JT-024    Kampung Sebelang, Kecamatan Muara Pahu        593/34/PEM-MP/V/2018             Fajar Sakti Prima      10.000
 335 Hamsiah                       FSP-JT-025    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/059/PEM-MP/XII/2019          Fajar Sakti Prima      25.031
 336 Muhamad Adha                  FSP-JT-026    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/034/PEM-MP/XI/2019           Fajar Sakti Prima      20.249
 337 Doni                          FSP-JT-027    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/013/PEM-MP/IV/2020           Fajar Sakti Prima      14.100
 338 Rusdiansyah                   FSP-JT-029    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/010/PEM-MP/IV/2020           Fajar Sakti Prima       9.398
 339 Rustam                        FSP-JT-034    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/033/PEM-MP/XI/2019           Fajar Sakti Prima      10.994
 340 Mulyadi/Codoi                 FSP-JT-035    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/060/PEM-MP/XII/2019          Fajar Sakti Prima      24.155
 341 Aziz Maulana-2                FSP-JT-036    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/011/PEM-MP/IV/2020           Fajar Sakti Prima       6.757
 342 Diun                          FSP-JT-037    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/014/PEM-MP/IV/2020           Fajar Sakti Prima       6.366
 343 Jumran K                      FSP-JT-038    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/012/PEM-MP/IV/2020           Fajar Sakti Prima       1.835
 344 Muhlis/H. Noor Adha           FSP-JT-039    Kampung Tanjung Pagar, Kecamatan Muara Pahu   593/058/PEM-MP/XII/2019          Fajar Sakti Prima      24.242

                                                                                                                                                    10.059.449

File

File Open PDF
Source IDX
Size6.38 MB
Published18 Jul 2025
Pages109
Characters324,408
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 182 people and organisations named in the text · linked when the evidence is strong

linked org BAYAN RESOURCES TBK · Nama Perusahaan p.1 ×33
linked org Negara Maju p.62
linked — Hitachi Construction p.75 ×2
possible org KJPP DAZ p.2 ×10
possible person Herman p.81 ×2
possible person Effendi p.107 ×2
unresolved org PT Fajar Sakti Prima p.1 ×8
unresolved org KJPP Dedy p.2 ×8
unresolved org Nazir dan Rekan p.2 ×10
unresolved org KJPP DAZ & REKAN p.2 ×4
unresolved org Menteri Keuangan p.2 ×3
unresolved org Kantor Jasa Penilai Publik Dedy p.2 ×2
unresolved org Menteri Keuangan Republik Indonesia p.2 ×3
unresolved org PENILAI Penilai KJPP DAZ & REKAN p.2
unresolved org Penilai KJPP DAZ & REKAN p.2 ×3
unresolved org Rekan Pardomuan p.5
unresolved person S.T.P. p.5 ×2
unresolved person Pardomuan p.7
unresolved person Muhammad Yusuf Fawwaz p.7 ×3
unresolved person Asrima Melati Daulay p.7
unresolved person Deni Faris Kurniawan p.7
unresolved person H. Construction In Progress p.17 ×2
unresolved org Identifikasi Status Penilai KJPP DAZ & REKAN p.18
unresolved org Properti. KJPP DAZ & REKAN p.18
unresolved org Bank Indonesia p.21 ×16
unresolved — Syarat Pembat · Penilai p.22
unresolved org Pertanahan p.24
unresolved org Kementerian ESDM p.69
unresolved org Menteri Energi dan Sumber Daya Mineral p.70
unresolved org Caterpilar Inc p.75
unresolved person Wenny p.81
unresolved org PT Fajar Sakti Prima Nilai Pasar p.91
unresolved org PT FAJAR SAKTI PRIMA FOTO p.93 ×17
unresolved — FSP-HR-017 p.105
unresolved — FSP-HR-016A p.105
unresolved — FSP-HR-162 p.105
unresolved — FSP-HR-161 p.105
unresolved — FSP-HR-089 p.105
unresolved — FSP-HR-089A p.105
unresolved — FSP-HR-177 p.105
unresolved — FSP-HR-001 p.105
unresolved — FSP-HR-135 p.105
unresolved — FSP-HR-139 p.105
unresolved — FSP-HR-140 p.105
unresolved — FSP-HR-187B p.105
unresolved — FSP-HR-187A p.105
unresolved — FSP-HR-125 p.105
unresolved — FSP-HR-175 p.105
unresolved — FSP-HR-109 p.105
unresolved — FSP-HR-111 p.105
unresolved — FSP-HR-179 p.105
unresolved — FSP-HR-149 p.105
unresolved — FSP-HR-176 p.105
unresolved — FSP-HR-183 p.105
unresolved — FSP-HR-105 p.105
unresolved — FSP-HR-107 p.105
unresolved — FSP-HR-076 p.105
unresolved — FSP-HR-005 p.105
unresolved — FSP-HR-004A p.105
unresolved — FSP-HR-188 p.105
unresolved — FSP-HR-058 p.105
unresolved — FSP-HR-090 p.105
unresolved — FSP-HR-090A p.105
unresolved — FSP-HR-058A p.105
unresolved — FSP-HR-057B p.105
unresolved — FSP-HR-057A p.105
unresolved — FSP-HR-006 p.105
unresolved — FSP-HR-077 p.105
unresolved — FSP-HR-008A p.106
unresolved — FSP-HR-008A1 p.106
unresolved — FSP-HR-008B p.106
unresolved — FSP-HR-082 p.106
unresolved — FSP-HR-083 p.106
unresolved — FSP-HR-083A p.106
unresolved — FSP-HR-164 p.106
unresolved — FSP-HR-158 p.106
unresolved — FSP-HR-173 p.106
unresolved — FSP-HR-182 p.106
unresolved — FSP-HR-174 p.106
unresolved — FSP-HR-180 p.106
unresolved — FSP-HR-110 p.106
unresolved — FSP-HR-104 p.106
unresolved — FSP-HR-022 p.106
unresolved — FSP-HR-022A p.106
unresolved — FSP-HR-078 p.106
unresolved — FSP-HR-023A p.106
unresolved — FSP-HR-023 p.106
unresolved — FSP-HR-021 p.106
unresolved — FSP-HR-008C p.106
unresolved — FSP-HR-008D p.106
unresolved — FSP-HR-069 p.106
unresolved — FSP-HR-071 p.106
unresolved — FSP-HR-150 p.106
unresolved — FSP-HR-144 p.106
unresolved — FSP-HR-022D p.106
unresolved — FSP-HR-069B p.106
unresolved — FSP-HR-069A p.106
unresolved — FSP-HR-080 p.106
unresolved — FSP-HR-070 p.106
unresolved — FSP-HR-212 p.106
unresolved — FSP-HR-079 p.106
unresolved — FSP-HR-022B p.106
unresolved — FSP-HR-029 p.106
unresolved — FSP-HR-029C2 p.106
unresolved — FSP-HR-153 p.106
unresolved — FSP-HR-115A p.106
unresolved — FSP-HR-115 p.106
unresolved — FSP-HR-123 p.106
unresolved — FSP-HR-102A p.106
unresolved — FSP-HR-103 p.106
unresolved — FSP-HR-092A p.106
unresolved — FSP-HR-092C p.106
unresolved — FSP-HR-092B p.106
unresolved — FSP-HR-025A p.106
unresolved — FSP-HR-025 p.106
unresolved — FSP-HR-154 p.107
unresolved — FSP-HR-029B p.107
unresolved — FSP-HR-029C1 p.107
unresolved — FSP-HR-081 p.107
unresolved — FSP-HR-091C p.107
unresolved — FSP-HR-091B p.107
unresolved — FSP-HR-091A p.107
unresolved — FSP-HR-197 p.107
unresolved — FSP-HR-117A p.107
unresolved — FSP-HR-117 p.107
unresolved — FSP-HR-118 p.107
unresolved — FSP-HR-137 p.107
unresolved — FSP-HR-137A p.107
unresolved — FSP-HR-146 p.107
unresolved — FSP-HR-196 p.107
unresolved — FSP-HR-198 p.107
unresolved — FSP-HR-059 p.107
unresolved — FSP-HR-199 p.107
unresolved — FSP-HR-145 p.107
unresolved — FSP-HR-120A p.107
unresolved — FSP-HR-129A p.107
unresolved — FSP-HR-131 p.107
unresolved — FSP-HR-131A p.107
unresolved — FSP-HR-065 p.107
unresolved — FSP-HR-134A p.107
unresolved — FSP-HR-157 p.107
unresolved — FSP-HR-157B p.107
unresolved — FSP-HR-157A p.107
unresolved — FSP-HR-156 p.107
unresolved — FSP-HR-066 p.107
unresolved — FSP-HR-066A p.107
unresolved — FSP-HR-068 p.107
unresolved — FSP-HR-041A p.107
unresolved — FSP-HR-041 p.107
unresolved — FSP-HR-041B p.107
unresolved — FSP-HR-156A p.107
unresolved — FSP-HR-201 p.107
unresolved — FSP-HR-160A p.107
unresolved — FSP-HR-160 p.107
unresolved — FSP-HR-202 p.108
unresolved — FSP-HR-184 p.108
unresolved — FSP-HR-147 p.108
unresolved — FSP-HR-185 p.108
unresolved — FSP-HR-159 p.108
unresolved — FSP-HR-048 p.108
unresolved — FSP-HR-049 p.108
unresolved — FSP-HR-048B Kampung Abit, Kecamatan Mook Manaar Bulatn p.108
unresolved — FSP-HR-050A Kampung Abit, Kecamatan Mook Manaar Bulatn p.108
unresolved — FSP-HR-054 p.108
unresolved — FSP-HR-060B Kampung Abit, Kecamatan Mook Manaar Bulatn p.108
unresolved — FSP-HR-060A Kampung Abit, Kecamatan Mook Manaar Bulatn p.108
unresolved — FSP-HR-055 p.108
unresolved — FSP-HR-193 p.108
unresolved — FSP-HR-195 p.108
unresolved — FSP-HR-194 p.108
unresolved — FSP-HR-192 p.108
unresolved — FSP-HR-073 p.108
unresolved — FSP-HR-072 p.108
unresolved — FSP-HR-056B Kampung Sebelang, Kecamatan Muara Pahu p.108
unresolved — FSP-HR-056C Kampung Sebelang, Kecamatan Muara Pahu p.108
unresolved — FSP-HR-056C-1 Kampung Sebelang, Kecamatan Muara Pahu p.108 ×10
unresolved — FSP-HR-056C-2 Kampung Sebelang, Kecamatan Muara Pahu p.108
unresolved person H. Gone p.109 ×5
unresolved person H. Asmuni Syukur- p.109 ×4
unresolved person H. Ermiwati p.109 ×2
unresolved person H. Noor Adha p.109

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

Rule parser Needs review confidence 0.091 7828 ms 12 Sep 2026 22:37
Raw output
{'appraiser_exempt': None,
 'appraiser_name': '',
 'assets': [],
 'currency': None,
 'fact_type': '',
 'issuer_name': '',
 'kind': 'CONFLICT',
 'kjpp_name': '',
 'letter_number': '',
 'object_text': '',
 'object_truncated': False,
 'parties': [],
 'pct_of_equity': None,
 'reference_period': '',
 'requires_rups': None,
 'rups_date': None,
 'ticker': '',
 'transaction_date': None,
 'valuation_date': None,
 'value': None}
↑↓ select ↵ open ⇧↵ see every result