Back to announcement
20250603_PPRE_Laporan Informasi dan Fakta Material_31891506.pdf
Other Text extracted PPRESource file signed link, expires in 15 minutes
Extracted text 4
Page 1
Go To English Page
Nomor Surat 020/EXT/CS/OJK-IDX/PPRE/VI/2025
Nama Perusahaan PT PP Presisi Tbk.
Kode Emiten PPRE
Lampiran 1
Informasi Terkait Rencana Sumber Dana Pembayaran Hutang Obligasi PUB 1
Perihal
Tahap 1 Tahun 2022 Seri A PT PP Presisi Tbk Yang Akan Jatuh Tempo Juni
2025
Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:
Nama Emiten atau Perusahaan Publik PT PP Presisi Tbk.
Bidang Usaha Konstruksi, Engineering Procurement & Construction (EPC),
pekerjaan mekanikal-elektrical, jasa transportasi/angkutan,
Telepon 0218414119
Faksimili 0218230353
Alamat Surat Elektronik (email) headoffice@pp-presisi.co.id
Tanggal Kejadian 02 Juni 2025
Jenis Informasi atau Fakta Material Informasi Terkait Rencana Sumber Dana Pembayaran Hutang
Obligasi PUB 1 Tahap 1 Tahun 2022 Seri A PT PP Presisi Tbk
Yang Akan Jatuh Tempo Juni 2025
Uraian Informasi atau Fakta Material Seiring dengan akan jatuh temponya Instrumen Surat Hutang
berbentuk Obligasi PUB 1 Tahap 1 PT PP Presisi Tbk Tahun
2022, maka dengan ini kami sampaikan informasi terkait
kesiapan, sumber pendanaan, serta komitmen manajemen
dalam memenuhi kewajiban pembayaran Obligasi PUB I
Tahap I Tahun 2022 Seri A milik PT PP Presisi Tbk, yang akan
jatuh tempo pada 30 Juni 2025, dengan detail sebagai berikut:
1. Perseroan akan mengalokasikan dana sebesar
Rp107.347.537.500 (Seratus Tujuh Miliar Tiga Ratus Empat
Puluh Tujuh Juta Lima Ratus Tiga Puluh Tujuh Ribu Lima
Ratus Rupiah) untuk memenuhi kewajiban pembayaran pokok
serta kupon obligasi Seri A yang akan jatuh tempo serta kupon
seri B. Dana ini akan disalurkan melalui KSEI dan akan
tersedia selambat-lambatnya satu hari kerja sebelum jatuh
tempo, sesuai dengan ketentuan yang diatur dalam Peraturan
KSEI No. II-B Pasal 3.2.1.4 Ayat A.
2. Sumber dana pembayaran obligasi jatuh tempo dapat
bersumber dari surplus kas operasi, pendanaan perbankan
serta refinancing melalui pasar modal.
3. Pemenuhan kewajiban keuangan secara tepat waktu
dan tepat jumlah merupakan komitmen Manajemen
Perseroan.
Dampak kejadian, informasi atau fakta -
material tersebut terhadap kegiatan
operasional, hukum, kondisi keuangan,
atau kelangsungan usaha Emiten atau
Perusahaan Publik
Demikian untuk diketahui.
Page 2
Hormat Kami,
PT PP Presisi Tbk.
Mei Elsa Kembaren
Corporate Secretary
PT PP Presisi Tbk.
Plaza PP Jl. TB Simatupang No.57 Pasar Rebo, Jakarta 13760
Telepon : 0218414119, Fax : 0218230353, www.pp-presisi.co.id
Nama Pengirim Mei Elsa Kembaren
Jabatan Corporate Secretary
Tanggal dan Waktu 04-06-2025 13:55
Lampiran 1. Kesiapan Dana Pembayaran Obligasi_PPRE.pdf
Dokumen ini merupakan dokumen resmi PT PP Presisi Tbk. yang tidak memerlukan tanda tangan karena dihasilkan
secara elektronik oleh sistem pelaporan elektronik. PT PP Presisi Tbk. bertanggung jawab penuh atas informasi
yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page
Letter / Announcement No. 020/EXT/CS/OJK-IDX/PPRE/VI/2025
Issuer Name PT PP Presisi Tbk.
Issuer Code PPRE
Attachment 1
Subject Information Regarding the Planned Source of Funds for the Payment of PT PP
Presisi Tbks Phase 1 2022 Series A Bonds Issued Through the Continuous
Public Offering, Which Are Due in June 2025.
The company hereby announce the Material Information or Facts Report as follows
Name of Issuer or Public Company PT PP Presisi Tbk.
Business Activities Konstruksi, Engineering Procurement & Construction (EPC),
pekerjaan mekanikal-elektrical, jasa transportasi/angkutan,
Telephone 0218414119
Faximile 0218230353
Email Address headoffice@pp-presisi.co.id
Date of Event 02 June 2025
Information Regarding the Planned Source of Funds for the
Type of Material Information or Facts Payment of PT PP Presisi Tbks Phase 1 2022 Series A Bonds
Issued Through the Continuous Public Offering, Which Are
Due in June 2025.
Description of Material Information or In line with the upcoming maturity of the Bond Instrument in
Facts the form of Phase 1 2022 Bonds issued through the
Continuous Public Offering (Penawaran Umum Berkelanjutan)
by PT PP Presisi Tbk, we hereby provide information regarding
the readiness, funding sources, and managements
commitment to fulfilling the payment obligations of the Phase 1
2022 Series A Bonds, which are due on June 30, 2025, with
details as follows:
1. The Company will allocate funds amounting to IDR
107,347,537,500 (One Hundred Seven Billion Three Hundred
Forty-Seven Million Five Hundred Thirty-Seven Thousand Five
Hundred Rupiah) to fulfill the principal payment obligation as
well as the coupon for Series A Bonds that will mature and the
coupon for Series B. This fund will be distributed through KSEI
and will be available no later than one business day prior to
maturity, in accordance with the provisions stipulated in KSEI
Regulation No. II-B Article 3.2.1.4 Paragraph A.
2. The source of funds for the bond payment may come from
operational cash surplus, bank financing, and refinancing
through the capital market.
3. The timely and accurate fulfillment of financial obligations is
a commitment of the Companys Management.
Impact of event, material information or -
facts towards Issuers or Public
Company’s operational activities, legal,
financial condition, or going concern
Thus to be informed accordingly.
Page 4
Respectfully,
PT PP Presisi Tbk.
Mei Elsa Kembaren
Corporate Secretary
PT PP Presisi Tbk.
Plaza PP Jl. TB Simatupang No.57 Pasar Rebo, Jakarta 13760
Phone : 0218414119, Fax : 0218230353, www.pp-presisi.co.id
Sender Name Mei Elsa Kembaren
Function Corporate Secretary
Date and Time 04-06-2025 13:55
Attachment 1. Kesiapan Dana Pembayaran Obligasi_PPRE.pdf
This is an official document of PT PP Presisi Tbk. that does not require a signature as it was generated
electronically by the electronic reporting system. PT PP Presisi Tbk. is fully responsible for the information
contained within this document.
Names mentioned 3 people and organisations named in the text · linked when the evidence is strong
unresolved
person
Elsa Kembaren
· Corporate Secretary
p.2 ×2
unresolved
org
PT PP Presisi Tbks Phase
p.3 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.