Back to announcement
20250530_IDPR_Rencana Transaksi Perubahan Kegiatan Usaha_31890549.pdf
Asset transaction Needs review IDPRSource file signed link, expires in 15 minutes
Extracted text 4
Page 1
Go To English Page
Nomor Surat 38/DIR-IDPR/V/2025
Nama Perusahaan PT Indonesia Pondasi Raya Tbk.
Kode Emiten IDPR
Lampiran 3
Perihal Rencana Transaksi Perubahan Kegiatan Usaha
Perseroan menyampaikan informasi tentang Rencana Transaksi Perubahan Kegiatan Usaha sebagai berikut :
Kegiatan Usaha Semula 1. KBLI 43901 - Pemasangan Pondasi dan Tiang
Kegiatan Usaha Baru 1. KBLI 43901 - Pemasangan Pondasi dan Tiang
Ketersediaan tenaga ahli berkaitan dengan perubahan kegiatan Sampai dengan akhir tahun 2024, jumlah
Ringkasan tentang studi kelayakan perubahan Kegiatan Usaha, meliputi paling sedikit:
1. Maksud dan Tujuan Maksud dan tujuan studi kelayakan ini adalah
2. Asumsi dan Kondisi Pembatas Laporan studi kelayakan ini dibatasi oleh asumsi
3. Pendapat atas kelayakan perubahan Kegiatan Usaha Rencana Penambahan KBLI adalah Layak
Penjelasan, pertimbangan, dan alasan dilakukannya perubahan Perseroan merupakan perusahaan yang memiliki
Tanggal RUPS 25 Juni 2025
Tanggal Pengumuman RUPS
Informasi tersebut telah diumumkan di media pengumuman sebagai berikut :
Tanggal Penerbitan Nama Media Pengumuman
19 Mei 2025 Website Emiten www.indopora.com
Demikian untuk diketahui.
Hormat Kami,
PT Indonesia Pondasi Raya Tbk.
Dwijanto
Corporate Secretary
PT Indonesia Pondasi Raya Tbk.
Jl. Pegangsaan Dua KM 4,5
Telepon : (021) 4603253, Fax : (021) 4604390; 4604393, www.indopora.com
Nama Pengirim Dwijanto
Page 2
Jabatan Corporate Secretary
Tanggal dan Waktu 30-05-2025 18:39
Lampiran 1. IDPR Ringkasan Laporan Studi Kelayakan.pdf
2. IDPR Laporan Studi Kelayakan.pdf
3. IDPR Laporan Informasi dan Fakta Material.pdf
Dokumen ini merupakan dokumen resmi PT Indonesia Pondasi Raya Tbk. yang tidak memerlukan tanda tangan
karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. PT Indonesia Pondasi Raya Tbk. bertanggung
jawab penuh atas informasi yang tertera didalam dokumen ini.
Page 3
Go To Indonesian Page
Letter / Announcement No. 38/DIR-IDPR/V/2025
Issuer Name PT Indonesia Pondasi Raya Tbk.
Issuer Code IDPR
Attachment 3
Subject Plan of Changes in Business Activity
The Company hereby announce information regarding Plan of Changes in Business Activity as follows:
Original Business Activities 1. KBLI 43901 - Pemasangan Pondasi dan
New Business Activities 1. KBLI 43901 - Pemasangan Pondasi dan
Availability of experts related to changes in business activities The Company has 3 certified or competent
Summary of the feasibility study for changes in Business Activities, including at least:
1. Purpose and Objectives The purpose and objective of this feasibility study
2. Assumptions and Limiting Conditions 4. The feasibility study analysis is carried out
3. Opinion on the feasibility of changing Business Activities KBLI Addition Plan is Feasible
Explanation, considerations, and reasons for changing Business The Company is a company that has a main
AGMS Date 25 Juni 2025
GMS Announcement Date
The information has been published in the following media:
Publication Date Publication Media
19 May 2025 Website Emiten www.indopora.com
Thus to be informed accordingly.
Respectfully,
PT Indonesia Pondasi Raya Tbk.
Dwijanto
Corporate Secretary
PT Indonesia Pondasi Raya Tbk.
Jl. Pegangsaan Dua KM 4,5
Phone : (021) 4603253, Fax : (021) 4604390; 4604393, www.indopora.com
Sender Name Dwijanto
Function Corporate Secretary
Page 4
Date and Time 30-05-2025 18:39
Attachment 1. IDPR Ringkasan Laporan Studi Kelayakan.pdf
2. IDPR Laporan Studi Kelayakan.pdf
3. IDPR Laporan Informasi dan Fakta Material.pdf
This is an official document of PT Indonesia Pondasi Raya Tbk. that does not require a signature as it was
generated electronically by the electronic reporting system. PT Indonesia Pondasi Raya Tbk. is fully responsible for
the information contained within this document.
Names mentioned 2 people and organisations named in the text · linked when the evidence is strong
unresolved
person
Dwijanto
· Nama Pengirim
p.1 ×2
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
Rule parser
Needs review
confidence 0.455
249 ms
12 Sep 2026 22:50
Raw output
{'appraiser_exempt': None,
'appraiser_name': '',
'assets': [],
'currency': None,
'fact_type': '',
'issuer_name': '',
'kind': 'MATERIAL_FACT',
'kjpp_name': '',
'letter_number': '38/DIR-IDPR/V/2025',
'object_text': '',
'object_truncated': False,
'parties': [],
'pct_of_equity': None,
'reference_period': '',
'requires_rups': True,
'rups_date': '2025-06-25',
'ticker': 'IDPR',
'transaction_date': None,
'valuation_date': None,
'value': None}