Skip to content
Back to announcement

20250422_DGNS_Pemanggilan RUPS_31876896_lamp2.pdf

RUPS notice Text extracted DGNS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 3

Page 1
                                                                          CURRICULUM VITAE
ANTONY SUBAGIA


 Address         The Green, Montecarlo G11/6
                 BSD, Tangerang Selatan 15310

 Contact No.     08118409017

 Email           a.subagia@gmail.com

 DOB             30 November 1978



 SKILL PROFILE   •    Senior level operations management with aims to create values for stakeholders.
                 •    Wide range of management skill include;
                               o Operations Management
                               o Procurement & Inventory Management
                               o Financial & Budget Control
                               o CRM and Sales Management
                 •    Experienced in project management from ideation through to execution, budget
                      planning, implementation and evaluation. Directing high level projects from
                      conceptualization to fully operational status. Projects include tech product
                      development, adaptive genomic technology workflows and pipelines,
                      manufacturing facility expansion and business development.
                 •    Strong leadership capabilities to develop, manage and foster a team-oriented
                      environment.
                 •    Well exercised skills to simultaneously direct and supervise operations of multiple
                      organizational units with various objectives.
                 •    Organized, highly motivated, analytical and comprehensive problem solver.



 EDUCATION       Master of Business Systems (MBS)                                         2002 – 2003
                 MONASH UNIVERSITY, Melbourne

                 Bachelor of Engineering (BE)                                             1998 – 2001
                 Mechanical & Manufacturing Engineering
                 UNIVERSITY OF MELBOURNE, Melbourne

                 Victorian Certificate of Education (VCE)                                 1996 – 1997
                 CAREY BAPTIST GRAMMAR SCHOOL, Melbourne

                 SMU Tarsisius II                                                         1995 – 1996
                 Jakarta




                                       Page 1 of 4
Page 2
EMPLOYMENT HISTORY   PT. ASA REN GLOBAL NUSANTARA                                              Mar 2022 – Jan 2025
                     Jakarta, Indonesia

                     Chief Operating Officer
                          •   Develop business plan for growth, define product roadmap and build team’s
                              competencies to achieve northstar metric.
                          •   Implement QMS ISO 9001 system throughout the organization and operations.
                          •   Hands-on approach in project management and executing activities.
                          •   Develop a robust bioinformatic workflow to translate raw primary analysis data to
                              secondary anlaysis, ready for tertiary analysis & interpretation.
                          •   Build the pharmacogenomic analysis pipeline, accomodating inputs from both
                              genotyping and sequencing data.
                          •   Maintain strong B2G relationships and navigate through regulations & bureaucratic
                              processes with clear transparency and accountability.


                     PT. SUM HING INDONESIA                                                August 2015 – June 2020
                     Cikarang, Indonesia

                     Director of Operations
                          •    Build the company as a greenfield project, including building on 10,000 m2 land with
                               complete infrastructure designed for flexible manufacturing operations.
                          •    Grow revenue from 0 to 50 billion rupiah annually within 5 years.
                          •    Develop and implement operational infrastructure and industrial processes to
                               accommodate rapid growth and industry 4.0.
                          •    Establish short-term and long-term objectives, and the strategies to meet goals while
                               fostering sustainable growth across all areas of the company.
                          •    Provide timely and accurate measurement of the efficiency and productivity of all
                               processes.


                     PT. MULTISTRADA ARAH SARANA Tbk.                                   May 2014 – December 2017
                     Cikarang, Indonesia

                     Head of Division - Engineering
                         •    Expansion project, increasing daily production capacity.
                         •    Develop MES 4.0 for WIP traceability & genealogy, integrating with level 3 (WMS &
                              CMMS) and level 4 systems (ERP).
                         •    Integrating IE functions into production to improve planning & scheduling.
                         •    Develop & implement inventory management system by matrix analysis for minimum,
                              optimal and accurate inventory level.

                     Head of Division – Maintenance & Utility
                         •    Develop maintenance management system with statistical process control, historical
                              knowledge base.
                         •    Improve energy management for reliable supply, cost efficiency and sustainable growth.

                     Head of Department – Strategic Management
                         •    Strategic management, 5-years projection identifying potential areas for cost
                              optimization (energy saving, maintenance & operations, streamlined business process).
                         •    Deploy a 24-months across divisions project that combines measurable business process
                              OKR, processes improvement, organization re-structure and technology to improve
                              productivity, quality and efficiency.




                                            Page 2 of 4
Page 3
PT. ALCAR CHEMCO INDONESIA                                               May 2013 – April 2014
Karawang, Indonesia

Director of Operations
     •    Defined corporate goals for mid-term business plan aimed at recovering losses &
          optimizing gains, successfully attaining sustainable positive growth.
     •    Re-establish accounting policy, internal SOP compliance, perform in-depth business
          analysis to measure performance, identify major cost centers, improve profitability and
          promote healthy business environment.
     •    Upgrade previous accounting system to an ERP system as backbone infrastructure for
          overall and improved internal control of the company.
     •    Successfully deliver 3 separate JV projects for the group holding company, working with
          3 different principal partners.


PT. MITRAMETAL PERKASA                                                   April 2008 – April 2013
Karawang, Indonesia

Director of Finance
     •    Manage fiscal activities focusing in budgeting, planning and allocating resources for
          immediate and future needs.
     •    Develop and execute Corporate Strategic Plan, updated cost & price structure, optimize
          sales budget with increasing annual sales achievement.
     •    Develop & launch new products for both OE & aftermarket customers.
     •    Successfully spinoff 1 business unit into independent JV with Japanese principal.

General Manager                                                    March 2007 – March 2008
    •    Design and develop the organization’s business system.
    •    Business process evaluation and improvement, applied directly to PPIC, Purchasing and
         Maintenance.
    •    Set up MIS Department to support and improve daily business activities.
    •    Implement centralized ERP system (SyteLine v8.0).


PT. CHEMCO HARAPAN NUSANTARA                                    December 2003 – February 2007
Cikarang, Indonesia

Finance Controller
    •    Manage Accounts Payable and non-regular material purchase.
    •    Project leader of management team responsible for Cost Reduction Project achieving 2%
         cost reduction of the annual COGS in 2005.

MIS Department Head
    •   Manage multiple site enterprise resources and information system.
    •   Establish measureable values of performance and auditable system quality.
    •   Reformation of network infrastructure to maintain flexibility and integration, promote
        availability and security as well as to improve application delivery and accessibility.
    •   Establish wireless integration of the company’s remote production site.
    •   Implement automatic data collection with barcode identification for automation of goods
        receiving process through to invoice processing.




                        Page 3 of 4

File

File Open PDF
Source IDX
Size0.18 MB
Published22 Apr 2025
Pages3
Characters9,092
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 6 people and organisations named in the text · linked when the evidence is strong

linked org MULTISTRADA ARAH SARANA Tbk. p.2 ×2
unresolved org PT. ASA REN GLOBAL NUSANTARA p.2
unresolved org PT. SUM HING INDONESIA p.2
unresolved org PT. ALCAR CHEMCO INDONESIA p.3
unresolved org PT. MITRAMETAL PERKASA p.3
unresolved org PT. CHEMCO HARAPAN NUSANTARA p.3

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result