Back to announcement
Laporan Keuangan AlamTri 31 December 2024.pdf
Financial statement Text extracted ADROSource file signed link, expires in 15 minutes
Extracted text 183
Page 1
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk) DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES LAPORAN KEUANGAN KONSOLIDASIAN/ CONSOLIDATED FINANCIAL STATEMENTS 31 DESEMBER 2024 DAN 2023/ 31 DECEMBER 2024 AND 2023
Page 2
Page 3
Page 4
LAPORAN AUDITOR INDEPENDEN INDEPENDENT AUDITORS' REPORT
KEPADA PARA PEMEGANG SAHAM TO THE SHAREHOLDERS OF
PT ALAMTRI RESOURCES INDONESIA TBK (DAHULU/FORMERL Y PT ADARO ENERGY
INDONESIA TBK)
Opini Opinion
Kami telah mengaudit laporan keuangan konsolidasian We have audited the consolidated financial statements
PT Alamtri Resources Indonesia Tbk (dahulu PT Adaro of PT Alamtri Resources Indonesia Tbk (formerly
Energy Indonesia Tbk) dan entitas anaknya ("Grup"), PT Adara Energy Indonesia Tbk) and its subsidiaries
yang terdiri dari laporan posisi keuangan konsolidasian (the "Group'J, which comprise the consolidated
tanggal 31 Desember 2024, serta laporan laba rugi dan statement of financial position as at 31 December 2024,
penghasilan komprehensif lain konsolidasian , laporan and the consolidated statement of profit or loss and
perubahan ekuitas konsol idasian dan laporan arus kas other comprehensive income, consolidated statement of
konsolidasian untuk tahun yang berakhir pada tanggal changes in equity and consolidated statement of cash
tersebut, serta catatan atas laporan keuangan flows for the year then ended, and notes to the
konsolidasian, termasuk informasi kebijakan akuntansi consolidated financial statements, including material
material. accounting policy information.
Menurut opini kami, laporan keuangan konsolidasian In our opinion, the accompanying consolidated financial
terlampir menyajikan secara wajar, dalam semua hal statements present fairly, in all material respects, the
yang material, posisi keuangan konsolidasian Grup consolidated financial position of the Group as at
tanggal 31 Desember 2024, serta kinerja keuangan 31 December 2024, and its consolidated financial
konsolidasian dan arus kas konsolidasiannya untuk performance and its consolidated cash flows for the year
tahun yang berakhir pada tanggal tersebut, sesuai then ended, in accordance with Indonesian Financial
dengan Standar Akuntansi Keuangan di Indonesia. Accounting Standards.
Basis Opini Basis for Opinion
Kami melaksanakan audit kami berdasarkan Standar We conducted our audit in accordance with Standards
Audit yang ditetapkan oleh lnstitut Akuntan Publik on Auditing established by the Indonesian Institute of
Indonesia. Tanggung jawab kami menurut standar Certified Public Accountants. Our responsibilities under
tersebut diuraikan lebih lanjut dalam paragraf those standards are further described in the "Auditors'
"Tanggung Jawab Auditor terhadap Audit alas Laporan Responsibilities for the Audit of the Consolidated
Keuangan Konsolidasian" pada laporan kami. Kami Financial Statements" paragraph of our report. We are
independen terhadap Grup berdasarkan kete ntuan etika independent of the Group in accordance with the ethical
yang relevan dalam audit kami atas laporan keuangan requirements that are relevant to our audit of the
konsolidasian di Indonesia, dan kami telah memenuhi consolidated financial statements in Indonesia, and we
tanggung jawab etika lainnya berdasarkan ketentuan have fulfilled our other ethical responsibilities in
tersebut. Kami yakin bahwa bukti audit yang telah kami accordance with these requirements. We believe that
peroleh adalah cukup dan tepat untuk menyediakan the audit evidence we have obtained is sufficient and
suatu basis bagi opini audit kami. appropriate to provide a basis for our opinion.
Hal Audit Utama Key Audit Matters
Hal audit utama adalah hal-hal yang , menurut Key audit matters are those matters that, in our
pertimbangan profesional kami, merupakan hal yang professional judgement, were of most significance in our
paling signifikan dalam audit kami atas laporan audit of the consolidated financial statements of the
keuangan konsolidasian periode kini. Hal-hal tersebut current period. These matters were addressed in the
disampaikan dalam konteks audit kami alas laporan context of our audit of the consolidated financial
keuangan konsolidasian secara keseluruhan, dan dalam statements as a whole, and in forming our opinion
merumuskan opini kami atas laporan keuangan thereon, and we do not provide a separate opinion on
konsolidasian terkait, kami tidak menyatakan suatu opini these matters.
terpisah atas hal audit utama tersebut.
Kantor Akuntan Publik Rintis, Jumadi, Rianto & Rekan
\ \/T C 3, Jl. J end. Sudirman Kav. 29-31, Jakarta 12920 - Indonesia
T: +62 (21) 5099 2901 / 3119 2901, F: +62 ( 21) 5290 5555 / 5290 5050, www.pwc.com/ id
Nemer lzin Usaha: KEP-3 15/KM.112024
00203/2.1457/AU .1/02/1130-5/ 1/ll/2025
Page 5
Hal audit utama yang teridentifikasi dalam audit kami The key audit matters identified in our audit are outlined
diuraikan sebagai berikut. as follows.
1. Akuntansi atas penjualan anak perusahaan 1. Accounting for sale of subsidiaries
Lihat Catatan 2(aa)- lnformasi kebijakan akuntansi Refer to Note 2(aa) - Material accounting policy
material - Kombinasi bisnis entitas sepengendali, information - Business combination of entities under
Catatan 2(af) - lnformasi kebijakan akuntansi common control, Note 2(af) - Material accounting
material - Kelompok lepasan yang diklasifikasikan policy information - Disposal groups held for sale
sebagai dimiliki untuk dijual dan operasi yang and discontinued operation and Note 40 -
dihentikan dan Catatan 40 - Operasi yang Discontinued operations.
dihentikan.
Pada 9 Desember 2024, PT Alamtri Resources On 9 December 2024, PT Alamtri Resources
Indonesia Tbk ("Perusahaan") menjual sebagian Indonesia Tbk (''The Company'; sold most of its
besar kepemilikannya pada PT Adaro Andalan ownership in PT Adara Anda/an Indonesia Tbk and
Indonesia Tbk dan entitas anak ("Adaro") kepada subsidiaries ("Adara") to the Company's
pemegang saham Perusahaan. Penjualan ini shareholders. The sale resulted in changes of
menghasilkan perubahan tambahan modal disetor additional paid in capital of US$ 68. 7 million. The
sebesar AS$ 68,7 juta. Penjualan kepada pemegang sale to the Company's shareholders was assessed
saham Perusahaan dinilai memenuhi kriteria to meet the criteria of a common control transaction
transaksi sepengendalian yang diatur oleh PSAK under SFAS 338 ("Business Combination of Entity
338 ("Kombinasi Bisnis Entitas Sepengendali") dan Under Common Control'; and has been accounted
dicatat sesuai dengan prinsip standar ini. Penjualan for in accordance with the principles of the standard.
Adaro telah diklasifikasikan sebagai operasi yang The sales of Adara has been classified as a
dihentikan. discontinued operation.
Kami mempertimbangkan hal ini sebagai hal audit We considered this as a key audit matter due to the
utama karena terdapat pertimbangan yang terlibat, judgement involved in the transaction, the
kompleksitas dan signifikansi finansial atas laporan complexity and the financial significance to
laba rugi dan penghasilan komprehensif lain consolidated statement of profit and loss and other
konsolidasian dan laporan posisi keuangan serta comprehensive income, statements of financial
pengungkapan terkait pada laporan keuangan position and the disclosures in the consolidated
konsolidasian. financial statements.
Baqaimana audit kami merespon hal audit utama How our audit addressed the key audit matter
Kami melakukan prosedur audit berikut untuk We petiormed the following audit procedures in
menanggapi hal ini: response to this matter:
• Kami menilai ketentuan utama yang terdapat • We assessed the key terms in the share sale
pada pengaturan penjualan saham dan arrangement and the application of these terms
penerapan atas ketentuan ini terhadap standar to the relevant accounting standards.
akuntansi yang relevan.
• Kami mengkaji tanggal hilangnya pengendalian • We assessed the date at which control was Jost
untuk menentukan nilai tercatat investasi yang in order to determine the appropriate carrying
sesuai pada tanggal yang relevan. amount of the investment at that date.
• Kami memperoleh pemahaman atas proses dan • We understood management's process and
perhitungan manajemen dalam menentukan calculation to determine the investment's
nilai tercatat investasi pada tanggal hilangnya carrying amount at the day control was lost in
pengendalian sesuai dengan standar akuntansi. accordance with the accounting standards.
• Kami menguji tambahan modal disetor dengan • We tested the additional paid in capital by
menghitung selisih antara imbalan kas yang calculating the difference between the cash
diterima dengan nilai tercatat investasi. consideration received and the investment's
carrying amount.
• Kami menguji informasi keuangan Adaro pada • We tested Adara's financial information at the
tanggal penjualan secara uji petik terhadap date of sale, on a sampling basis, to supporting
dokumen pendukung. documents.
00203/2.1457/AU.1/02/1130-5/1/ll/2025
Page 6
• Kami mengevaluasi klasifikasi sebagai operasi • We evaluated the classification as a
yang dihentikan dan apakah pengungkapan discontinued operation and whether the
yang dibuat dalam catatan alas laporan disclosures in notes to the consolidated
keuangan konsolidasian telah sesuai dengan financial statements were in accordance with
persyaratan standar akuntansi. the requirements of the accounting standards.
2. Penilaian penurunan nilai atas goodwill 2. Impairment assessment of goodwill
Lihat Catalan 2m - lnformasi kebijakan akuntansi Refer to Note 2m - Material accounting policy
material - Penurunan nilai dari aset non-keuangan, information - Impairment of non-financial assets,
Catalan 3 - Estimasi dan pertimbangan akuntansi Note 3 - Critical accounting estimates and
yang penting - Penurunan nilai aset non-keuangan judgements - Impairment of non-financial assets
dan Catalan 13 - Goodwill, alas laporan keuangan and Note 13 - Goodwill, to the consolidated financial
konsolidasian. statements.
Pada langgal 31 Desember 2024, Grup memiliki As at 31 December 2024, the Group held goodwill of
goodwill sebesar AS$39 juta yang diakui dalam US$39 million in the consolidated statement of
laporan posisi keuangan konsolidasiannya. Goodwill financial position. The goodwill mainly arose from
lersebut terutama berasal dari akuisisi lini usaha jasa the acquisitions of the mining services lines of
pertambangan. business.
Grup menguji penurunan nilai untuk goodwill secara The Group assesses the impairment of goodwill
tahunan. Penilaian penurunan nilai dilakukan pada annually. The impairment assessment is performed
Unit Penghasil Kas ("UPK") dan dengan menentukan for each Cash Generating Unit ("CGU'J and by
jumlah terpulihkan melalui model nilai wajar determining the recoverable amount through fair
dikurangi biaya pelepasan, yang melibatkan value less cost of disposal models, which involves
pertimbangan dan asumsi yang signifikan significant judgement and assumptions with respect
sehubungan dengan proyeksi arus kas, tingkat to projected cash flows, inflation rate, sales and
inflasi, tingkat penjualan dan produksi, slruktur biaya, production levels, cost structures and the post-tax
dan tingkat diskonto selelah pajak yang diterapkan. discount rates applied.
Penilaian penurunan nilai alas goodwill The impairment assessment of goodwill is
dipertimbangkan sebagai hal audit utama karena considered to be a key audit matter due to the
saldo goodwill yang signifikan lerhadap laporan judgement and assumptions that are subject to the
keuangan konsolidasian Grup dan melibatkan risk and uncertainty in determining the recoverable
pertimbangan dan asumsi yang signifikan yang amount.
terpengaruh oleh risiko dan ketidakpaslian dalam
menentukan jumlah terpulihkan.
Bagaimana audit kami merespon hal audit utama How our audit addressed the key audit matter
Kami melakukan prosedur audit berikut sebagai We performed the following audit procedures in
tanggapan alas hal ini: response to this matter:
• Kami memperoleh pemahaman alas dasar • We understood the basis for the assumptions
asumsi yang digunakan oleh manajemen dan used by management and assessed whether
menilai apakah proses penilaian penurunan nilai the impairment assessment process and
dan asumsi telah diterapkan secara konsisten assumptions had been applied consistently by
oleh Grup. the Group.
• Kami mengevaluasi asumsi utama yang • We evaluated the key assumptions used in the
digunakan dalam penilaian penurunan nilai alas impairment assessments of goodwill. Our
goodwill. Prosedur kami termasuk procedures included comparing the key
membandingkan asumsi utama dengan kinerja assumptions to the historical financial
keuangan historis, rencana bisnis yang disetujui performance, approved business plans and
dan sumber-sumber informasi eksternal. external sources of information.
• Kami melibatkan ahli penilaian kami untuk • We involved our valuation experts to evaluate
membantu kami dalam mengevaluasi tingkat the discount rates.
diskonto.
00203/2.1457/AU.1/02/1130-5/1/II/2025
Page 7
• Kami menilai kewajaran proyeksi arus kas • We assessed the reasonableness of
manajemen dengan membandingkan anggaran management's projected cash flows by
tahun 2024 dengan hasil operasi aktual. comparing the 2024 budget to actual operating
results.
• Kami memeriksa akurasi matematis dari model • We checked the mathematical accuracy of the
penurunan nilai. impairment models.
• Kami melakukan analisis sensitivitas alas • We performed sensitivity analysis of the key
asumsi utama dalam model untuk menilai assumptions in the model to assess the
sensitivitas asumsi-asumsi dan potensi rentang sensitivity of the assumptions and the potential
kemungkinan hasil pengukuran. range of possible outcomes.
3. Provisi pembongkaran, rehabilitasi, reklamasi 3. Provision for decommissioning, mine
dan penutupan tambang rehabilitation, reclamation and closure
Lihat Catalan 2s (i) - lnformasi kebijakan akuntansi Refer to Note 2s (i) - Material accounting policy
material - Provisi pembongkaran, rehabilitasi, information - Provision for decommissioning, mine
reklamasi dan penutupan tambang, Catalan 3 - rehabilitation, reclamation and closure, Note 3 -
Estimasi dan pertimbangan akuntansi yang penting - Critical accounting estimates and judgements -
Provisi pembongkaran, rehabilitasi, reklamasi , dan Provision for decommissioning, mine rehabilitation,
penutupan tambang dan Catalan 22 - Provisi reclamation and closure and Note 22 - Provision for
pembongkaran, rehabilitasi, reklamasi dan decommissioning, mine rehabilitation, reclamation
penutupan tambang, atas laporan keuangan and closure, to the consolidated financial
konsolidasian. statements.
Provisi pembongkaran, rehabilitasi, reklamasi dan The Group's provision for decommissioning, mine
penutupan tambang Grup sebesar AS$30,3 juta rehabilitation, reclamation and closure was US$30.3
pada tanggal 31 Desember 2024. Kewajiban ini million as at 31 December 2024. These obligations
diakui sebagai liabilitas pada saat timbulnya are recognised as liabilities when a legal or
kewajiban hukum atau konstruktif yang berasal dari constructive obligation has arisen from activities that
aktivitas yang telah dilaksanakan. have already been performed.
Asumsi-asumsi utama yang digunakan untuk The key assumptions used in determining the
menentukan provisi pembongkaran, rehabilitasi , provision for decommissioning, mine rehabilitation,
reklamasi, dan penutupan tambang termasuk: reclamation and closure included the:
- Umur operasi; - Life of the operation;
- Perkiraan biaya untuk aktivitas pembongkaran, - Estimated cost of future decommissioning, mine
rehabilitasi, reklamasi, dan penutupan tambang; rehabilitation, reclamation and closure activities;
- Waktu kegiatan; - Timing of the activities;
- Tingkat diskonto; dan - Discount rates; and
- Tingkat inflasi. - Inflation rates.
Dikarenakan adanya asumsi-asumsi ini, provisi As a result of these assumptions, the provision for
pembongkaran, rehabilitasi, reklamasi , dan decommissioning, mine rehabilitation, reclamation
penutupan tam bang merupakan subjek alas tingkat and closure is subject to a high degree of estimation
ketidakpastian estimasi yang tinggi dengan berbagai uncertainty with a range of possible measurement
rentang kemungkinan hasil pengukuran. outcomes.
Provisi untuk pembongkaran, rehabilitasi, reklamasi, The provision for decommissioning, mine
dan penutupan tambang dipertimbangkan sebagai rehabilitation, reclamation and closure is considered
hal audit utama karena saldo yang signifikan to be a key audit matter due to the significance of
terhadap laporan keuangan konsolidasian Grup dan the balance to the Group's consolidated financial
diperlukannya pertimbangan dalam audit kami alas statements and judgement involved in our audit of
asumsi-asumsi utama tertentu yang digunakan oleh ce11ain key assumptions used by the Group in
Grup untuk menentukan provisi. determining the provision.
0020312.1457/AU.1/02/ 1130-5/ 1/l l/2025
Page 8
Baqaimana audit kami merespon hal audit utama How our audit addressed the key audit matter
Kami melakukan prosedur audit berikut untuk We performed the following audit procedures in
menanggapi hal ini: response to this matter:
• Kami memperoleh pemahaman atas dasar • We understood the basis for the assumptions
asumsi yang digunakan dan menilai apakah used and assessed whether the calculation
metode perhitungan dan asumsi yang diterapkan methodology and assumptions had been applied
konsisten berdasarkan kebijakan Grup. consistently in accordance with the Group's
policies.
• Kami menilai kualifikasi, kompetensi dan • We assessed the qualifications, competence and
objektivitas para tenaga ahli internal Grup yang objectivity of the Group's internal experts
terlibat dalam proses penghitungan provisi dan involved in the process of calculating the
apakah informasi yang diberikan oleh para provision and whether the information provided
tenaga ahli internal Grup telah tercermin dengan by the Group's internal experts were
tepat dalam menentukan asumsi estimasi biaya di appropriately reflected in determining the
masa mendatang untuk pembongkaran, assumptions for estimated cost of future
rehabil itasi, reklamasi dan penutupan tambang. decommissioning, mine rehabilitation,
reclamation and closure activities.
• Kami memeriksa metodologi yang digunakan • We checked that the methodology used to
untuk menentukan asumsi terkait biaya determine the assumptions related to future mine
penutupan tambang di masa mendatang closure costs was consistent with the closure
konsisten dengan rencana penutupan yang plans that were submitted to the Indonesian
disampaikan kepada Pemerintah Indonesia oleh Government by the Group.
Grup.
• Kami membandingkan asumsi perkiraan biaya • We compared historical forecast cost
historis dengan biaya aktual yang terjadi untuk assumptions to actual costs incurred to assess
menilai kemampuan Grup dalam mengestimasi the Group's ability to accurately forecast costs.
perkiraan biaya secara akurat.
• Kami menilai tingkat diskonto dan tingkat inflasi • We assessed the discount rates and inflation
yang digunakan untuk menghitung provisi rates used to calculate the provision for
pembongkaran, rehabilitasi, reklamasi dan decommissioning, mine rehabilitation,
penutupan tambang , termasuk membandingkan reclamation and closure, by benchmarking to
dengan informasi yang tersedia secara publik. publicly available information.
• Kami memeriksa rencana penutupan tambang • We inspected the recent mine closure plans
terbaru yang disiapkan oleh Grup dan izin prepared by the Group and the applicable mining
pertambangan yang berlaku sehubungan dengan permits relating to the term of operations and the
umur operasi dan waktu kegiatan penutupan timing of closure activities, and compared them
tambang, dan membandingkannya dengan angka to those used in the calculation of the provision.
yang digunakan dalam perhitungan provisi.
• Kami memeriksa akurasi matematis dari • We checked the mathematical accuracy of
perhitungan manajemen atas provisi management's calculation of the provision for
pembongkaran, rehabilitasi, reklamasi , dan decommissioning, mine rehabilitation,
penutupan tambang. reclamation and closure.
lnformasi Lain Other Information
Manajemen bertanggung jawab atas informasi lain. Management is responsible for the other information.
lnformasi lain terdiri dari informasi yang tercantum The other information comprises the information
dalam laporan tahunan, tetapi tidak termasuk laporan included in the annual repo,1, but does not include the
keuangan konsolidasian dan laporan auditor kami. consolidated financial statements and our auditors'
Laporan tahunan diharapkan akan tersedia bagi kami report thereon. The annual report is expected to be
setelah tanggal laporan auditor ini. made available to us after the date of this auditors'
report.
Opini kami atas laporan keuangan konsolidasian tidak Our opinion on the consolidated financial statements
mencakup informasi lain, dan oleh karena itu, kami tidak does not cover the other information and we will not
menyatakan bentuk keyakinan apapun atas informasi express any form of assurance conclusion thereon.
lain tersebut.
00203/2.1457/AU.1/02/1130-5/1/l l/2025
Page 9
Sehubungan dengan audit kami alas laporan keuangan In connection with our audit of the consolidated financial konsolidasian, tangg ung jawab kami adalah untuk statements, our responsibility is to read the other membaca informasi lain yang teridentifikasi di alas, information identified above when it becomes available ketika tersedia dan, dalam melaksanakannya, and, in doing so, consider whether the other information mempertimbangkan apakah informasi lain mengandung is materially inconsistent with the consolidated financial ketidakkonsistensian material dengan laporan keuangan statements or our knowledge obtained in the audit, or konsolidasian atau pemahaman yang kami peroleh othe,wise appears to be materially misstated. selama audit, atau mengandung kesalahan penyajian material. Ketika kami membaca laporan tahunan, j ika kami When we read the annual report, if we conclude that menyimpulkan bahwa terdapat suatu kesalahan there is a material misstatement therein, we are required penyajian material di dalamnya, kami diharuskan untuk to communicate the matter to those charged with mengomunikasikan hal tersebut kepada pihak yang governance and take appropriate actions in accordance bertanggung jawab al as tata kelola dan mengambil with Standards on Auditing established by the tindakan tepat berdasarkan Standar Audit yang Indonesian Institute of Certified Public Accountants. ditetapkan oleh lnstitut Akuntan Publik Indonesia. Tanggung Jawab Manajemen dan Pihak yang Responsibilities of Management and Those Charged Bertanggung Jawab atas Tata Kelola terhadap with Governance for the Consolidated Financial Laporan Keuangan Konsolidasian Statements Manajemen bertanggung jawab alas penyusunan dan Management is responsible for the preparation and fair penyajian waja r laporan keuangan konsolidasian presentation of the consolidated financial statements in tersebut sesuai dengan Standar Akuntansi Keuangan di accordance with Indonesian Financial Accounting Indonesia, dan alas pengendalian internal yang Standards, and for such internal control as management dianggap perlu oleh manajemen untuk memungkinkan determines is necessary to enable the preparation of penyusunan laporan keuangan konsolidasian yang consolidated financial statements that are free from bebas dari kesalahan penyajian material, baik yang material misstatement, whether due to fraud or error. disebabkan oleh kecura ngan maupun kesalahan. Dalam penyusunan laporan keuangan konsolidasian, In preparing the consolidated financial statements, manajemen bertanggung jawab untuk menilai management is responsible for assessing the Group's kemampuan Grup dalam mempertahankan ability to continue as a going concern, disclosing, as kelangsungan usahanya, mengungkapkan, sesuai applicable, matters related to going concern and using dengan kondisinya, hal-hal yang berkaitan dengan the going concern basis of accounting unless kelangsungan usaha, dan menggunakan basis management either intends to liquidate the Group or to akuntansi kelangsungan usaha, kecuali manajemen cease operations, or has no realistic alternative but to memiliki intensi untuk melikuidasi Grup atau doso. menghentikan operasi, atau tidak memiliki alternatif yang realistis selain melaksanakannya. Pihak yang bertanggung jawab alas tata kelola Those charged with governance are responsible for bertanggung jawab untuk mengawasi proses pelaporan overseeing the Group's financial reporting process. keuangan Grup. Tanggung Jawab Auditor terhadap Audit atas Auditors' Responsibilities for the Audit of the Laporan Keuangan Konsolidasian Consolidated Financial Statements Tujuan kami adalah untuk memperoleh keyakinan Our objectives are to obtain reasonable assurance memadai tentang apakah laporan keuangan about whether the consolidated financial statements as konsolidasian secara keseluruhan bebas dari kesala han a whole are free from material misstatement, whether penyajian material, baik yang disebabkan oleh due to fraud or error, and to issue an auditors' report kecurangan maupun kesalahan, dan untuk menerbitkan that includes our opinion. laporan auditor yang mencakup opini kami. 00203/2.1457/AU.1/02/1130-5/1/11/2025
Page 10
pwc
Keyakinan memadai merupakan suatu tingkat Reasonable assurance is a high level of assurance, but
keyakinan tinggi, namun bukan merupakan suatu is not a guarantee that an audit conducted in
jaminan bahwa audit yang dilaksanakan berdasarkan accordance with Standards on Auditing will always
Standar Audit akan selalu mendeteksi kesalahan detect a material misstatement when it exists.
penyajian material ketika hal tersebut ada. Kesalahan Misstatements can arise from fraud or error and are
penyajian dapat disebabkan oleh kecurangan maupun considered material if, individually or in the aggregate,
kesalahan dan dianggap material jika, baik secara they could reasonably be expected to influence the
individual maupun secara agregat, dapat economic decisions of users taken on the basis of these
diekspektasikan secara wajar akan memengaruhi consolidated financial statements.
keputusan ekonomi yang diambil oleh pengguna
berdasarkan laporan keuangan konsolidasian tersebut.
Sebagai bagian dari suatu audit berdasarkan Standar As part of an audit in accordance with Standards on
Audit, kami menerapkan pertimbangan profesional dan Auditing, we exercise professional judgement and
mempertahankan skeptisisme profesional selama audit. maintain professional scepticism throughout the audit.
Kami juga: We also:
Mengidentifikasi dan menilai risiko kesalahan Identify and assess the risks of material
penyajian material dalam laporan keuangan misstatement of the consolidated financial
konsolidasian, baik yang disebabkan oleh statements, whether due to fraud or error, design
kecurangan maupun kesalahan, mendesain dan and perform audit procedures responsive to those
melaksanakan prosedur audit yang responsif risks, and obtain audit evidence that is sufficient
terhadap risiko tersebut, serta memperoleh bukti and appropriate to provide a basis for our opinion.
audit yang cukup dan tepat untuk menyediakan The risk of not detecting a material misstatement
basis bagi opini kami. Risiko tidak terdeteksinya resulting from fraud is higher than for one resulting
kesalahan penyajian material yang disebabkan oleh from error, as fraud may involve collusion, forgery,
kecurangan lebih tinggi dari yang disebabkan oleh intentional omissions, misrepresentations, or the
kesalahan, karena kecurangan dapat melibatkan override of internal control.
kolusi, pemalsuan , penghilangan secara sengaja,
pernyataan salah , atau pengabaian pengendalian
internal.
Memperoleh suatu pemahaman tentang Obtain an understanding of internal control relevant
pengendalian internal yang relevan dengan audit to the audit in order to design audit procedures that
untuk mendesain prosedur audit yang tepat sesuai are appropriate in the circumstances, but not for the
dengan kondisinya, tetapi bukan untuk tujuan purpose of expressing an opinion on the
menyatakan opini alas keefektivitasan effectiveness of the Group's intemal control.
pengendalian internal Grup.
Mengevaluasi ketepatan kebijakan akuntansi yang Evaluate the appropriateness of accounting policies
digunakan serta kewajaran estimasi akuntansi dan used and the reasonableness of accounting
pengungkapan terkait yang dibuat oleh manajemen. estimates and related disclosures made by
management.
Menyimpulkan ketepatan penggunaan basis Conclude on the appropriateness of management's
akuntansi kelangsungan usaha oleh manajemen use of the going concern basis of accounting and,
dan, berdasarkan bukti audit yang diperoleh, based on the audit evidence obtained, whether a
apakah terdapat suatu ketidakpastian material yang material uncertainty exists related to events or
terkait dengan peristiwa atau kondisi yang dapat conditions that may cast significant doubt on the
menyebabkan keraguan signifikan atas Group's ability to continue as a going concern. If we
kemampuan Grup untuk mempertahankan conclude that a material uncertainty exists, we are
kelangsungan usahanya. Ketika kami required to draw attention in our auditors' report to
menyimpulkan bahwa terdapat suatu ketidakpastian the related disclosures in the consolidated financial
material, kam i diharuskan untuk menarik perhatian statements or, if such disclosures are inadequate,
dalam laporan auditor kami ke pengungkapan to modify our opinion. Our conclusions are based
terkait dalam laporan keuangan konsolidasian atau, on the audit evidence obtained up to the date of our
jika pengungkapan tersebut tidak memadai, harus auditors' report. However, future events or
menentukan apakah perlu untuk memodifikasi opini conditions may cause the Group to cease to
kami. Kesimpulan kami didasarkan pada bukti audit continue as a going concern.
yang diperoleh hingga tanggal laporan auditor kami.
Namun, peristiwa atau kondisi masa depan dapat
menyebabkan Grup tidak dapat mempertahankan
kelangsungan usaha.
00203/2 .1457/AU.1 /02/ 1130-5/1/II/2025
Page 11
Mengevaluasi penyajian, struktur, dan isi laporan Evaluate the overall presentation, structure and
keuangan konsolidasian secara keseluruhan, content of the consolidated financial statements,
termasuk pengungkapannya, dan apakah laporan including the disclosures, and whether the
keuangan konsolidasian mencerminkan transaksi consolidated financial statements represent the
dan peristiwa yang mendasarinya dengan suatu underlying transactions and events in a manner that
cara yang mencapai penyajian wajar. achieves fair presentation.
Memperoleh bukti audit yang cukup dan tepat Obtain sufficient appropriate audit evidence
terkait informasi keuangan entitas atau aktivitas regarding the financial information of the entities or
bisnis dalam Grup untuk menyatakan opini atas business activities within the Group to express an
laporan keuangan konsolidasian. Kami opinion on the consolidated financial statements.
bertanggung jawab atas arahan, supervisi dan We are responsible for the direction, supervision
pelaksanaan audit grup. Kami tetap bertanggung and performance of the group audit. We remain
jawab sepenuhnya atas opini audit kami. solely responsible for our audit opinion.
Kami mengomunikasikan kepada pihak yang We communicate with those charged with governance
bertanggung jawab atas tata kelola mengenai, antara regarding, among other matters, the planned scope and
lain, ruang lingkup dan saat yang direncanakan atas timing of the audit and significant audit findings,
audit serta temuan audit signifikan, termasuk setiap including any significant deficiencies in internal control
defisiensi signifikan dalam pengendalian internal yang that we identify during our audit.
teridentifikasi oleh kami selama audit.
Kami juga memberikan suatu pernyataan kepada pihak We also provide those charged with governance with a
yang bertanggung jawab atas tata kelola bahwa kami statement that we have complied with relevant ethical
telah mematuhi ketentuan etika yang relevan mengenai requirements regarding independence, and to
independensi, dan mengomunikasikan seluruh communicate with them all relationships and other
hubungan serta hal-hal lain yang dianggap secara wajar matters that may reasonably be thought to bear on our
berpengaruh terhadap independensi kami, dan jika independence, and where applicable, related
relevan , pengamanan terkait. safeguards.
Dari hal-hal yang dikomunikasikan kepada pihak yang From the matters communicated with those charged
bertanggung jawab alas tata kelola, kami menentukan with governance, we determine those matters that were
hal-hal tersebut yang paling signifikan dalam audit atas of most significance in the audit of the consolidated
laporan keuangan konsolidasian periode kini dan oleh financial statements of the current period and are
karenanya menjadi hal audit utama. Kami menguraikan therefore the key audit matters. We describe these
hal audit utama dalam laporan auditor kami kecuali matters in our auditors' report unless law or regulation
peraturan perundang-undangan melarang precludes public disclosure about the matter or when, in
pengungkapan publik tentang hal tersebut atau ketika, extremely rare circumstances, we determine that a
dalam kondisi yang sangat jarang terjadi, kami matter should not be communicated in our report
menentukan bahwa suatu hal tidak boleh because the adverse consequences of doing so would
dikomunikasikan dalam laporan kami karena reasonably be expected to outweigh the public interest
konsekuensi merugikan dari mengomunikasikan hal benefits of such communication.
tersebut akan diekspektasikan secara wajar melebihi
manfaat kepentingan publik alas komunikasi tersebut.
JAKARTA,
28 Februari/February 2025
Daniel Kohar, S.E., CPA Mamtn R~ :tihkiMwlU:
lzin Akuntan Publik/Pub/ic Accountant License No. AP.1130 0020).'2 1J.S7JIJJ 1'02J'l1».Yl.-'2025
00203/2.1457/AU.1/02/1130-5/1/ll/2025
Page 12
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 1/1 Schedule
LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS
KONSOLIDASIAN PADA TANGGAL OF FINANCIAL POSITION
31 DESEMBER 2024 DAN 2023 AS AT 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham) except for par value and share data)
Catatan/
Notes 2024 2023
ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan setara kas 4 1,405,918 3,311,232 Cash and cash equivalents
Kas dan deposito berjangka yang
dibatasi penggunaannya - Restricted cash and time
bagian lancar 5 3,851 4,054 deposits - current portion
Piutang usaha 7a 349,973 520,494 Trade receivables
Investasi lain-lain - Other investments -
bagian lancar 6 627,693 48,271 current portion
Persediaan 9 99,997 171,076 Inventories
Pajak dibayar dimuka - Prepaid taxes -
bagian lancar 33a 27,514 103,641 current portion
Pajak yang bisa dipulihkan Recoverable taxes -
kembali - bagian lancar 33b - 39,196 current portion
Other receivables -
Piutang lain-lain - bagian lancar 7b 51,245 21,457 current portion
Pinjaman untuk pihak ketiga - Loans to third parties -
bagian lancar 14 31,228 26,356 current portion
Pinjaman untuk pihak berelasi - Loans to related parties -
bagian lancar 34b 2,176 - current portion
Uang muka dan biaya dibayar Advances and prepayments -
dimuka - bagian lancar 8 4,138 47,671 current portion
Aset lancar lain-lain 2,029 8,585 Other current assets
Total aset lancar 2,605,762 4,302,033 Total current assets
ASET TIDAK LANCAR NON-CURRENT ASSETS
Kas dan deposito berjangka yang
dibatasi penggunaannya - Restricted cash and time
bagian tidak lancar 5 10,938 52,252 deposits - non-current portion
Investasi lain-lain - Other investments -
bagian tidak lancar 6 - 501,188 non-current portion
Piutang lain-lain - bagian tidak Other receivables -
lancar 7b 38,970 102,510 non-current portion
Investasi pada ventura bersama 11 653,516 1,363,594 Investments in joint ventures
Pinjaman untuk pihak ketiga - Loans to third parties -
bagian tidak lancar 14 152,638 170,733 non-current portion
Pinjaman untuk pihak berelasi - Loans to related parties -
bagian tidak lancar 34b 916,929 143,637 non-current portion
Uang muka dan biaya dibayar Advances and prepayments -
dimuka - bagian tidak lancar 8 118,660 171,460 non-current portion
Pajak dibayar dimuka - Prepaid taxes -
bagian tidak lancar 33a 34,146 15,721 non-current portion
Properti pertambangan 12 547,119 994,553 Mining properties
Aset tetap 10 1,529,381 1,754,405 Fixed assets
Goodwill 13 39,665 776,943 Goodwill
Aset takberwujud - 5,090 Intangible assets
Piutang jasa konsesi - 25,936 Service concession receivables
Aset pajak tangguhan 33e 44,944 85,492 Deferred tax assets
Aset tidak lancar lain-lain 9,459 7,164 Other non-current assets
Total aset tidak lancar 4,096,365 6,170,678 Total non-current assets
TOTAL ASET 6,702,127 10,472,711 TOTAL ASSETS
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 13
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 1/2 Schedule
LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS
KONSOLIDASIAN PADA TANGGAL OF FINANCIAL POSITION
31 DESEMBER 2024 DAN 2023 AS AT 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham) except for par value and share data)
Catatan/
Notes 2024 2023
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS LIABILITIES
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Utang usaha 15 158,360 344,743 Trade payables
Utang dividen 27 200,000 429,510 Dividends payable
Beban yang masih harus dibayar 17 151,668 257,975 Accrued expenses
Liabilitas imbalan kerja jangka Short-term employee benefits
pendek 13 1,978 liabilities
Utang pajak: Taxes payable:
- Pajak penghasilan badan 33c 17,447 86,345 Corporate income tax payable -
- Pajak lainnya 33c 8,172 27,884 Other taxes payable -
Utang royalti 16 22,232 26,988 Royalties payable
Bagian lancar atas pinjaman Current maturity of long-term
jangka panjang: borrowings:
- Liabilitas sewa 18 29,057 28,794 Lease liabilities -
- Utang bank 19 29,682 222,782 Bank loans -
Senior Notes 20 - 697,189 Senior Notes
Provisi pembongkaran, rehabilitasi, Provision for decommissioning,
reklamasi dan penutupan mine rehabilitation, reclamation
tambang - bagian jangka pendek 22 4,855 5,802 and closure - current portion
Utang dan provisi lain-lain 25,909 5,244 Other liabilities and provision
Total liabilitas jangka pendek 647,395 2,135,234 Total current liabilities
LIABILITAS JANGKA PANJANG NON-CURRENT LIABILITIES
Pinjaman dari pihak ketiga - 3,013 Loans from third parties
Pinjaman jangka panjang setelah
dikurangi bagian yang akan Long-term borrowings, net of
jatuh tempo dalam satu tahun: current maturities:
- Liabilitas sewa 18 88,450 83,117 Lease liabilities -
- Utang bank 19 432,656 404,361 Bank loans -
Liabilitas pajak tangguhan 33e 94,656 155,532 Deferred tax liabilities
Liabilitas imbalan Post-employment
pasca kerja 21 42,664 73,938 benefits liabilities
Provision for decommissioning,
Provisi pembongkaran, rehabilitasi, mine rehabilitation,
reklamasi dan penutupan reclamation and closure -
tambang - bagian jangka panjang 22 25,474 208,766 non-current portion
Total liabilitas jangka panjang 683,900 928,727 Total non-current liabilities
TOTAL LIABILITAS 1,331,295 3,063,961 TOTAL LIABILITIES
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 14
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 1/3 Schedule
LAPORAN POSISI KEUANGAN CONSOLIDATED STATEMENTS
KONSOLIDASIAN PADA TANGGAL OF FINANCIAL POSITION
31 DESEMBER 2024 DAN 2023 AS AT 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham) except for par value and share data)
Catatan/
Notes 2024 2023
EKUITAS EQUITY
Ekuitas yang diatribusikan Equity attributable to
kepada pemilik entitas induk owners of the parent entity
Modal saham - modal dasar Share capital - authorised
80.000.000.000 lembar; 80,000,000,000 shares;
ditempatkan dan disetor penuh issued and fully paid
30.758.665.900 lembar 30,758,665,900 shares
(2023: 31.985.962.000 lembar) (2023: 31,985,962,000
dengan nilai nominal shares) at par value of
Rp100 per saham 23 329,256 342,940 Rp100 per share
Tambahan modal disetor, neto 24 891,557 1,154,494 Additional paid-in capital, net
Saham treasuri 23 (70,667) (158,308) Treasury shares
Difference in value from
Selisih transaksi dengan transactions with
pihak non-pengendali 25 157,815 157,815 non-controlling interests
Saldo laba Retained earnings
- Dicadangkan 26 68,588 68,588 Appropriated -
- Belum dicadangkan 26 3,325,952 5,151,562 Unappropriated -
Penghasilan komprehensif lain 224,355 55,573 Other comprehensive income
Total ekuitas yang diatribusikan Total equity attributable to
kepada pemilik entitas induk 4,926,856 6,772,664 owners of the parent entity
Kepentingan non-pengendali 28 443,976 636,086 Non-controlling interests
TOTAL EKUITAS 5,370,832 7,408,750 TOTAL EQUITY
TOTAL LIABILITAS DAN TOTAL LIABILITIES AND
EKUITAS 6,702,127 10,472,711 EQUITY
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 15
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 2/1 Schedule
LAPORAN LABA RUGI DAN PENGHASILAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
UNTUK TAHUN-TAHUN YANG BERAKHIR FOR THE YEARS ENDED
PADA TANGGAL 31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali laba per saham dasar dan dilusian) except for basic and diluted earnings per share)
Catatan/
Notes 2024 2023*)
Pendapatan usaha 29 2,078,689 2,135,412 Revenue
Beban pokok pendapatan 30 (1,204,690) (1,267,731) Cost of revenue
Laba bruto 873,999 867,681 Gross profit
Beban usaha 31 (140,357) (93,945) Operating expenses
Beban lain-lain, neto 32 (22,241) (8,801) Other expenses, net
Laba usaha 711,401 764,935 Operating income
Biaya keuangan 38 (54,142) (64,508) Finance costs
Penghasilan keuangan 38 119,962 66,102 Finance income
Bagian atas keuntungan neto Share in net profit of
ventura bersama 11 32,599 52,059 joint ventures
98,419 53,653
Laba sebelum pajak penghasilan 809,820 818,588 Profit before income tax
Beban pajak penghasilan 33d (172,336) (165,282) Income tax expense
Laba dari Profit from
operasi yang berlanjut 637,484 653,306 continuing operations
Laba dari operasi Profit from discontinued
yang dihentikan 40 918,648 1,201,572 operations
Laba tahun berjalan 1,556,132 1,854,878 Profit for the year
*) Direpresentasikan, lihat Catatan 40 *) As represented, see Note 40
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 16
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 2/2 Schedule
LAPORAN LABA RUGI DAN PENGHASILAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
UNTUK TAHUN-TAHUN YANG BERAKHIR FOR THE YEARS ENDED
PADA TANGGAL 31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali laba per saham dasar dan dilusian) except for basic and diluted earnings per share)
Catatan/
Notes 2024 2023*)
(Kerugian)/penghasilan Other comprehensive
komprehensif lain (loss)/income for
tahun berjalan: the year:
Pos-pos yang akan direklasifikasi Items that will be reclassified
ke laba rugi: to profit or loss:
Exchange difference due to
Selisih kurs karena penjabaran financial statements
laporan keuangan (22,818) 19,348 translation
Bagian atas penghasilan Share of other
komprehensif lain comprehensive income
dari ventura bersama 11 12,598 (7,366) of joint ventures
(10,220) 11,982
Pos-pos yang tidak akan Items that will not be reclassified
direklasifikasi ke laba rugi: to profit or loss:
Perubahan nilai wajar atas Changes in fair value of
investasi pada nilai investment in funds
wajar melalui penghasilan at fair value through
komprehensif lain 6a 182,076 12,850 other comprehensive income
Remeasurement of
Pengukuran kembali liabilitas post-employment
imbalan pasca kerja 33d 3,519 (3,566) benefits liabilities
Pajak penghasilan terkait pos ini 33d (742) 713 Income tax relating to this item
184,853 9,997
174,633 21,979
Total penghasilan komprehensif Total comprehensive income
tahun berjalan, setelah pajak 1,730,765 1,876,857 for the year, net of tax
*) Direpresentasikan, lihat Catatan 40 *) As represented, see Note 40
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 17
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 2/3 Schedule
LAPORAN LABA RUGI DAN PENGHASILAN CONSOLIDATED STATEMENTS OF PROFIT OR LOSS
KOMPREHENSIF LAIN KONSOLIDASIAN AND OTHER COMPREHENSIVE INCOME
UNTUK TAHUN-TAHUN YANG BERAKHIR FOR THE YEARS ENDED
PADA TANGGAL 31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali laba per saham dasar dan dilusian) except for basic and diluted earnings per share)
Catatan/
Notes 2024 2023*)
Laba tahun berjalan yang dapat Profit for the year
diatribusikan kepada: attributable to:
Pemilik entitas induk 1,380,013 1,641,437 Owners of the parent entity
Kepentingan non-pengendali 28 176,119 213,441 Non-controlling interests
Laba tahun berjalan 1,556,132 1,854,878 Profit for the year
Laba tahun berjalan Profit for the year
diatribusikan kepada attributable to owners
pemilik entitas induk: of the parent entity:
Operasi yang berkelanjutan 569,880 578,129 Continuing operations
Operasi yang dihentikan 810,133 1,063,308 Discontinued operations
1,380,013 1,641,437
Total penghasilan komprehensif Total comprehensive
tahun berjalan yang dapat income for the year
diatribusikan kepada: attributable to:
Pemilik entitas induk 1,551,199 1,662,235 Owners of the parent entity
Kepentingan non-pengendali 28 179,566 214,622 Non-controlling interests
Total penghasilan komprehensif Total comprehensive income
tahun berjalan, setelah pajak 1,730,765 1,876,857 for the year, net of tax
Total penghasilan Total comprehensive
komprehensif tahun berjalan income for the year
diatribusikan kepada attributable to owners
pemilik entitas induk: of the parent entity:
Operasi yang berkelanjutan 744,981 585,274 Continuing operations
Operasi yang dihentikan 806,218 1,076,961 Discontinued operations
1,551,199 1,662,235
Laba per saham Earnings per share
dari operasi for profit from
yang berkelanjutan continuing operations
diatribusikan kepada attributable to owners
pemilik entitas induk 35 of the parent entity
- Dasar (nilai penuh) 0.01855 0.01870 Basic (full amount) -
- Dilusian (nilai penuh) 0.01855 0.01870 Diluted (full amount) -
Laba per saham Earnings per share
diatribusikan kepada attributable to owners
pemilik entitas induk 35 of the parent entity
- Dasar (nilai penuh) 0.04491 0.05309 Basic (full amount) -
- Dilusian (nilai penuh) 0.04491 0.05309 Diluted (full amount) –
*) Direpresentasikan, lihat Catatan 40 *) As represented, see Note 40
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 18
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 3/1 Schedule
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK TAHUN-TAHUN YANG BERAKHIR FOR THE YEARS ENDED
PADA TANGGAL 31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS) (Expressed in thousands of US Dollars)
Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
Penghasilan komprehensif lain/
Other comprehensive income
Cadangan
perubahan nilai
wajar aset
keuangan pada
nilai wajar melalui
Bagian penghasilan
penghasilan/ komprehensif lain/
Selisih transaksi (kerugian) Reserve for
dengan pihak komprehensif changes in fair
Tambahan non-pengendali/ Translasi lain dari value of
modal Difference mata ventura bersama/ financial assets
disetor, neto/ Saham in value from Saldo laba/Retained earnings uang asing/ Share of other at fair value Kepentingan
Additional treasuri/ transactions with Belum Foreign comprehensive through other non-pengendali/ Total
Modal saham/ paid-in Treasury non-controlling Dicadangkan/ dicadangkan/ currency income/(loss) comprehensive Non-controlling ekuitas/
Share capital capital, net shares interests Appropriated Unappropriated translation of joint ventures income Total interests Total equity
Saldo pada 1 Januari 2023 342,940 1,154,494 (139,936) 153,614 68,588 4,412,865 (67,903) 88,971 10,967 6,024,600 502,738 6,527,338 Balance as at 1 January 2023
Total penghasilan komprehensif Total comprehensive income
tahun berjalan - - - - - 1,638,697 18,818 (7,366) 12,086 1,662,235 214,622 1,876,857 for the year
Pembelian saham treasuri Purchase of treasury shares
(Catatan 23) - - (18,372) - - - - - - (18,372) - (18,372) (Note 23)
Penerbitan saham entitas anak Issuance of subsidiaries’
kepada kepentingan shares to non-controlling
non-pengendali - - - - - - - - - - 48,571 48,571 interests
Akuisisi kepentingan Acquisition of non-controlling
non-pengendali - - - - - - - - - - (1,129) (1,129) interest
Transaksi dengan pihak Transactions with non-controlling
non-pengendali - - - 4,201 - - - - - 4,201 - 4,201 interests
Dividen (Catatan 27) - - - - - (900,000) - - - (900,000) (128,716) (1,028,716) Dividends (Note 27)
Saldo pada 31 Desember 2023 342,940 1,154,494 (158,308) 157,815 68,588 5,151,562 (49,085) 81,605 23,053 6,772,664 636,086 7,408,750 Balance as at 31 December 2023
Catatan atas laporan keuangan konsolidasian terlampir merupakan bagian yang The accompanying notes to the consolidated financial statements form an
tidak terpisahkan dari laporan keuangan konsolidasian secara keseluruhan. integral part of these consolidated financial statements.
Page 19
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 3/2 Schedule
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK TAHUN-TAHUN YANG BERAKHIR FOR THE YEARS ENDED
PADA TANGGAL 31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS) (Expressed in thousands of US Dollars)
Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
Penghasilan komprehensif lain/
Other comprehensive income
Cadangan
perubahan nilai
wajar aset
keuangan pada
nilai wajar melalui
Bagian penghasilan
penghasilan/ komprehensif lain/
Selisih transaksi (kerugian) Reserve for
dengan pihak komprehensif changes in fair
Tambahan non-pengendali/ Translasi lain dari value of
modal Difference mata ventura bersama/ financial assets
disetor, neto/ Saham in value from Saldo laba/Retained earnings uang asing/ Share of other at fair value Kepentingan
Additional treasuri/ transactions with Belum Foreign comprehensive through other non-pengendali/ Total
Modal saham/ paid-in Treasury non-controlling Dicadangkan/ dicadangkan/ currency income/(loss) comprehensive Non-controlling ekuitas/
Share capital capital, net shares interests Appropriated Unappropriated translation of joint ventures income Total interests Total equity
Saldo pada 1 Januari 2024 342,940 1,154,494 (158,308) 157,815 68,588 5,151,562 (49,085) 81,605 23,053 6,772,664 636,086 7,408,750 Balance as at 1 January 2024
Total penghasilan komprehensif Total comprehensive income
tahun berjalan - - - - - 1,382,677 (22,523) 9,310 181,735 1,551,199 179,566 1,730,765 for the year
Pembelian saham treasuri Purchase of treasury shares
(Catatan 23) - - (89,378) - - - - - - (89,378) - (89,378) (Note 23)
Pengurangan modal ditempatkan Reduction of issued and paid-up
dan disetor (Catatan 23 dan 24) (13,684) (163,335) 177,019 - - - - - - - - - capital (Notes 23 and 24)
Kehilangan pengendalian - - - - - - - - - - (304) (304) Loss of control
Dividen (Catatan 27) - - - - - (3,229,396) - - - (3,229,396) (155,623) (3,385,019) Dividends (Note 27)
Penerbitan saham entitas anak Issuance of subsidiary’s
kepada kepentingan shares to non-controlling
non-pengendali (Catatan 28) - - - - - - - - - - 31,115 31,115 interests (Note 28)
Efek dilusi dari penerbitan saham Dillution effect from
entitas anak - (30,922) - - - - - - - (30,922) - (30,922) issuance of subsidiary’s shares
Penjualan entitas anak Sales of subsidiary
kepada entitas to entity under
sepengendali (Catatan 40) - (68,680) - - - 21,109 37,252 (10,863) (26,129) (47,311) (246,864) (294,175) common control (Note 40)
Saldo pada 31 Desember 2024 329,256 891,557 (70,667) 157,815 68,588 3,325,952 (34,356) 80,052 178,659 4,926,856 443,976 5,370,832 Balance as at 31 December 2024
Catatan atas laporan keuangan konsolidasian terlampir merupakan bagian yang The accompanying notes to the consolidated financial statements form an
tidak terpisahkan dari laporan keuangan konsolidasian secara keseluruhan. integral part of these consolidated financial statements.
Page 20
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 4/1 Schedule
LAPORAN ARUS KAS CONSOLIDATED
KONSOLIDASIAN STATEMENTS OF CASH FLOWS
UNTUK TAHUN-TAHUN YANG BERAKHIR FOR THE YEARS ENDED
PADA TANGGAL 31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS) (Expressed in thousands of US Dollars)
Catatan/
Notes 2024 2023
Arus kas dari aktivitas operasi Cash flows from operating activities
Penerimaan dari pelanggan 5,775,450 6,631,344 Receipts from customers
Pembayaran kepada pemasok
dan kontraktor (2,215,968) (2,169,391) Payments to suppliers and contractors
Pembayaran biaya karyawan (291,071) (288,155) Payments of employee costs
Penerimaan penghasilan bunga 134,648 113,152 Receipts of finance income
Pembayaran royalti (1,041,235) (1,517,850) Payments of royalties
Pembayaran pajak penghasilan badan Payments of corporate income tax
dan pajak penghasilan final (445,896) (1,529,593) and final income tax
Penerimaan pengembalian Pajak Receipts of Value
Pertambahan Nilai ("PPN") 222,251 - Added Tax (“VAT”) refund
Pembayaran Penerimaan Negara Payments of Non-Tax State Revenue
Bukan Pajak (“PNBP”) dan (“PNBP”) and regional government
pendapatan pemerintah daerah (32,123) - revenue
Penerimaan restitusi pajak penghasilan 6,930 5,501 Receipts of income tax refunds
Pembayaran biaya keuangan (95,625) (102,004) Payments of finance costs
(Pembayaran)/penerimaan lain-lain, neto (1,215) 9,754 Other (payments)/receipts, net
Arus kas bersih yang diperoleh dari Net cash flows provided
aktivitas operasi 2,016,146 1,152,758 from operating activities
Arus kas dari aktivitas investasi Cash flows from investing activities
Pembelian investasi lain-lain (36,014) (114,363) Purchase of other investments
Penerimaan hasil penjualan Proceeds from sales of
investasi lain-lain 17,036 146,660 other investments
Pembayaran atas
penambahan aset tetap (813,451) (560,301) Payments for addition of fixed assets
Arus kas keluar bersih dari akuisisi Net cash outflow from acquisition
entitas anak (156) (107) of subsidiaries
Pembelian Senior Notes 20 - (7,030) Purchase of Senior Notes
Penerimaan Senior Notes 20 49,957 - Receipts from Senior Notes
Pembayaran atas penambahan Payments for addition of mining
properti pertambangan (23,134) (24,981) properties
Pembayaran atas penambahan aset Payments for addition of intangible
takberwujud (881) (2,491) assets
Pemberian pinjaman ke pihak ketiga (18,720) (42,172) Loans given to third parties
Pemberian pinjaman ke pihak berelasi (17,686) (3,024) Loan given to a related party
Penerimaan pembayaran kembali Receipts from repayment of loans given
pinjaman ke pihak berelasi 70,428 3,381 to related parties
Penerimaan hasil penjualan aset tetap 10 10,198 6,977 Proceeds from disposal of fixed assets
Penempatan kas dan deposito
berjangka yang dibatasi Placement of restricted cash and
penggunaannya (20,354) (24,761) time deposits
Penerimaan dari pencairan kas dan
deposito berjangka yang dibatasi Proceeds from withdrawal of restricted
penggunaannya 25,572 17,604 cash and time deposits
Penerimaan dari Receipts from
operasi yang dihentikan 40 2,181,049 - discontinued operations
Penerimaan pembayaran kembali Receipts from repayment of loans
pinjaman ke pihak ketiga 7,025 7,862 given to third parties
Penerimaan dividen dari investasi Dividends received from investments
pada ventura bersama 12,049 18,525 in joint ventures
Pembayaran atas penambahan Payments for additional investment
investasi pada ventura bersama (8,623) (4,205) in joint ventures
Arus kas bersih yang
diperoleh dari/(digunakan Net cash flows provided from/
untuk) aktivitas investasi 1,434,295 (582,426) (used in) investing activities
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 21
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 4/2 Schedule
LAPORAN ARUS KAS CONSOLIDATED
KONSOLIDASIAN STATEMENTS OF CASH FLOWS
UNTUK TAHUN-TAHUN YANG BERAKHIR FOR THE YEARS ENDED
PADA TANGGAL 31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS) (Expressed in thousands of US Dollars)
Catatan/
Notes 2024 2023
Arus kas dari aktivitas pendanaan Cash flows from financing activities
Penerimaan pembayaran yang
ditangguhkan dari kepentingan Receipts of deferred consideration
non-pengendali - 15,400 from non-controlling interest
Penerimaan dari
Penawaran Umum Receipts from subsidiary’s
Saham Perdana Initial Public
entitas anak 272,166 - Offering (“IPO”)
Pembayaran biaya penerbitan Payment of subsidiary’s share
saham anak perusahaan (3,225) - issuance costs
Penerimaan utang bank 1,134,957 210,988 Proceeds from bank loans
Pembayaran utang bank (600,194) (400,600) Repayments of bank loans
Pembayaran pinjaman Repayments of loan
dari pihak ketiga 15,596 3,076 from third parties
Penerimaan dari pinjaman Proceeds from loan
dari pihak ketiga - (3,256) from third parties
Pembayaran dividen kepada Payments of dividends to
pemegang saham Perusahaan 27 (3,429,396) (1,000,000) the Company’s shareholders
Pembayaran Senior Notes 20 (750,000) - Payments of Senior Notes
Pembayaran dividen kepada Payments of dividends to
kepentingan non-pengendali (183,738) (131,701) non-controlling interests
Pembayaran liabilitas sewa 37 (34,754) (36,435) Payments of lease liabilities
Pembayaran biaya transaksi Payment of transaction
atas utang bank (5,338) (21,474) costs of bank loans
Penerimaan setoran modal dari Proceeds of capital injection from
kepentingan non-pengendali 31,115 48,563 non-controlling interests
Penerimaan dari kepentingan Proceeds from non-controlling
non-pengendali atas akuisisi interests on the acquisition
kepentingan pada entitas anak - 121 of interest in subsidiaries
Pembayaran untuk pembelian Payments for purchase
saham treasuri 23 (89,378) (18,372) of treasury shares
Arus kas bersih yang digunakan Net cash flows used in
untuk aktivitas pendanaan (3,642,189) (1,333,690) financing activities
Penurunan bersih Net decrease in
kas dan setara kas (191,748) (763,358) cash and cash equivalents
Kas dan setara kas Cash and cash equivalents at
pada awal tahun 3,311,232 4,067,358 the beginning of the year
Penurunan bersih kas yang Net decrease in cash
dihasilkan atas operasi generated by the
yang dihentikan 40 (1,681,054) - discontinued operations
Efek perubahan nilai kurs pada Effect of exchange rate changes on
kas dan setara kas (32,512) 7,232 cash and cash equivalents
Kas dan setara kas Cash and cash equivalents at
pada akhir tahun 1,405,918 3,311,232 the end of the year
Lihat Catatan 37 untuk penyajian informasi arus kas Grup. Refer to Note 37 for presentation of the Group’s cash
flow information.
Lihat Catatan 40 untuk penyajian informasi arus kas Grup dari Refer to Note 40 for presentation of the Group’s cash
operasi yang dihentikan flows of discontinued operations.
Catatan atas laporan keuangan konsolidasian terlampir merupakan The accompanying notes to the consolidated financial statements form an
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian integral part of these consolidated financial statements.
secara keseluruhan.
Page 22
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/1 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM 1. GENERAL
a. Pendirian Perusahaan dan informasi a. Establishment of the Company and other
lainnya information
PT Alamtri Resources Indonesia Tbk (dahulu PT Alamtri Resources Indonesia Tbk
PT Adaro Energy Indonesia Tbk) (formerly PT Adaro Energy Indonesia Tbk)
(“Perusahaan”) didirikan berdasarkan Akta (the “Company”) was established by Notarial
Notaris Sukawaty Sumadi, S.H., Notaris di Deed No. 25 dated 28 July 2004 of Sukawaty
Jakarta, No. 25, tertanggal 28 Juli 2004. Akta Sumadi, S.H., Notary in Jakarta. The Deed
pendirian Perusahaan diumumkan dalam was published in the State Gazette of the
Berita Negara Republik Indonesia No. 59, Republic of Indonesia No. 59, dated 25 July
tertanggal 25 Juli 2006, Tambahan Berita 2006, State Gazette Supplement No. 8036 and
Negara No. 8036 dan disetujui oleh Menteri was approved by the Minister of Justice of
Kehakiman Republik Indonesia dengan Surat the Republic of Indonesia in Decree
Keputusan No. C-21493 HT.01.01.TH.2004, No. C-21493 HT.01.01.TH.2004, dated
tertanggal 26 Agustus 2004. anggaran dasar 26 August 2004. The articles of association of
Perusahaan telah diubah beberapa kali the Company have been amended several
dengan perubahan terakhir berdasarkan Akta times, with the most recent change by Deed
No. 55 tertanggal 18 November 2024 yang No. 55 dated 18 November 2024 made before
dibuat di hadapan Humberg Lie, S.H., M.Kn., Humberg Lie, S.H., M.Kn., Notary in North
Notaris di Jakarta Utara, sehubungan dengan Jakarta, in connection with change of the
perubahan nama Perusahaan menjadi PT Company’s name to PT Alamtri Resources
Alamtri Resources Indonesia Tbk. Perubahan Indonesia Tbk. This amendment to the articles
anggaran dasar ini berlaku efektif sejak of association was effective since the
Perusahaan mendapatkan persetujuan dari Company obtained approval from the Minister
Menteri Hukum Republik Indonesia of Law of the Republic of Indonesia pursuant
berdasarkan surat keputusan No. AHU- to Decree No. AHU-
0248324.AH.01.11.TAHUN 2024 tertanggal 19 0248324.AH.01.11.TAHUN 2024 dated
November 2024. 19 November 2024.
Pada bulan Juli 2008, Perusahaan melakukan In July 2008, the Company conducted an IPO
Penawaran Umum Saham Perdana sebanyak of 11,139,331,000 shares (34.8% of
11.139.331.000 lembar saham (34,8% dari 31,985,962,000 shares issued and fully paid
31.985.962.000 modal saham yang up) and was listed on the Indonesia Stock
ditempatkan dan disetor penuh) dan secara Exchange on 16 July 2008.
resmi tercatat di Bursa Efek Indonesia pada
tanggal 16 Juli 2008.
Sesuai dengan Pasal 3 anggaran dasar In accordance with Article 3 of the Company’s
Perusahaan, Maksud dan Tujuan Perusahaan articles of association, the Purpose and
adalah menjalankan usaha dalam bidang Objectives of the Company are conducting
aktivitas kantor pusat dan konsultasi business in the field of head office and
manajemen (untuk kegiatan usaha entitas management consulting activities (for the
anak Perusahaan yang bergerak dalam Company’s subsidiaries’ business activities
bidang pertambangan, penggalian, jasa which include mining, quarrying, mining
penunjang pertambangan, perdagangan support services, trading, transportation,
besar, angkutan, pergudangan dan aktivitas warehousing and transportation support
penunjang angkutan, penanganan kargo services, cargo handling (stevedoring), sea
(bongkar muat barang), aktivitas pelayanan port service activities, agriculture,
kepelabuhanan laut, pertanian tanaman, construction, repair and installation of
konstruksi, reparasi dan pemasangan mesin, machines, power supply, water treatment,
pengadaan listrik, pengelolaan air, kehutanan forestry and industry).
dan industri).
Perusahaan mulai beroperasi secara The Company commenced its commercial
komersial pada bulan Juli 2005. Perusahaan operations in July 2005. The Company’s head
berdomisili di Jakarta dan berlokasi di Gedung office is in Jakarta and is located at the Menara
Menara Karya, lantai 23, Jl. H.R. Rasuna Said Karya Building, 23rd floor, Jl. H.R. Rasuna
Blok X-5, Kav. 1-2, Jakarta Selatan. Said Block X-5, Kav. 1-2, South Jakarta.
Page 23
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/2 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
a. Pendirian Perusahaan dan informasi a. Establishment of the Company and other
lainnya (lanjutan) information (continued)
PT Adaro Strategic Investments (“ASI”) PT Adaro Strategic Investments (“ASI”)
bersama dengan Bapak Garibaldi Thohir, together with Garibaldi Thohir is the
merupakan Pengendali dari Perusahaan Company’s Controller as stipulated in Article 1
sebagaimana dimaksud dalam Pasal 1 angka number 4 letter a of the OJK Regulation
4 huruf a Peraturan Otoritas Jasa Keuangan No. 9/POJK.04/2018 concerning the
No. 9/POJK.04/2018 tentang Pengambilalihan acquisition of a Publicly Traded Companies, as
Perusahaan Terbuka, karena ASI dan Bapak ASI and Garibaldi Thohir collectively own
Garibaldi Thohir secara bersama-sama 52.089% of shares in the Company’s.
memiliki 52,089% saham pada Perusahaan.
Lebih lanjut, Pemilik Manfaat Perusahaan Furthermore, the Company’s Beneficial
adalah Bapak Garibaldi Thohir, Bapak Owners are Garibaldi Thohir, Christian Ariano
Christian Ariano Rachmat, Bapak Crescento Rachmat, Crescento Hermawan, and Michael
Hermawan, dan Bapak Michael W.P. W.P. Soeryadjaya, collectively act in their
Soeryadjaya, secara kolektif bertindak dalam capacity as a member of the Board of Directors
kapasitasnya sebagai anggota Direksi ASI, of ASI which own 45.663% of shares in the
yang merupakan pemilik 45,663% saham Company’s, together with Garibaldi Thohir, in
pada Perusahaan, bersama dengan Bapak his capacity as an individual who directly owns
Garibaldi Thohir, dalam kapasitasnya sebagai 6.426% of the shares in the Company’s
individu pemegang 6,426% saham secara resulting those parties collectively own a total
langsung pada Perusahaan, sehingga secara of 52.089% of shares in the Company’s,
bersama-sama pihak-pihak tersebut memiliki because to the extent that those parties are
sejumlah 52,089% saham pada Perusahaan, acting jointly and the decision making is
karena sepanjang pihak-pihak tersebut implemented through the Company’s General
bertindak secara bersama-sama dan Meeting of Shareholders, those parties have
pengambilan keputusan dilaksanakan melalui the authority or power to influence or control
Rapat Umum Pemegang Saham Perusahaan, the Company without having to obtain
pihak-pihak tersebut memiliki kewenangan authorisation from any parties, as stipulated in
atau kekuasaan untuk mempengaruhi atau Article 4 paragraph (1) letter e of the
mengendalikan Perusahaan tanpa harus Presidential Regulation No. 13 of 2018 on
mendapat otorisasi dari pihak manapun, Implementation Of Know-Your-Beneficial-
sebagaimana diatur dalam Pasal 4 ayat (1) Owner Principle by Corporations for the
huruf e Peraturan Presiden No. 13/2018 Purpose of Prevention and Eradication of
tentang Penerapan Prinsip Mengenali Pemilik Money Laundering and Terrorism Financing.
Manfaat Dari Korporasi Dalam Rangka
Pencegahan dan Pemberantasan Tindak
Pidana Pencucian Uang dan Tindak Pidana
Pendanaan Terorisme.
Berdasarkan Akta No. 44 tertanggal 22 Mei Based on Deed No. 44 dated 22 May 2023 and
2023 dan Akta No. 8 tertanggal 4 Juni 2024 Deed No. 8 dated 4 June 2024 made before
yang dibuat dihadapan Humberg Lie, S.H., Humberg Lie, S.H., S.E., M.Kn., Notary in
S.E., M.Kn., Notaris di Jakarta Utara, susunan North Jakarta, the composition of the
anggota Direksi dan Dewan Komisaris Company’s Boards of Commissioners and
Perusahaan pada tanggal 31 Desember 2024 Directors as at 31 December 2024 was as
adalah sebagai berikut: follows:
Presiden Komisaris : Edwin Soeryadjaya : President Commissioner
Wakil Presiden Komisaris : Theodore Permadi Rachmat : Vice President Commissioner
Komisaris : Arini Saraswaty Subianto : Commissioner
Komisaris Independen : Mohammad Effendi : Independent Commissioners
Budi Bowoleksono
Presiden Direktur : Garibaldi Thohir : President Director
Wakil Presiden Direktur : Christian Ariano Rachmat : Vice President Director
Direktur : Julius Aslan : Directors
Iwan Dewono Budiyuwono
M. Syah Indra Aman
Michael William P. Soeryadjaya
Page 24
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/3 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
a. Pendirian Perusahaan dan informasi lainnya a. Establishment of the Company and other
(lanjutan) information (continued)
Berdasarkan Akta No. 44 tertanggal 22 Mei Based on Deed No. 44 dated 22 May 2023
2023 yang dibuat dihadapan Humberg Lie, S.H., made before Humberg Lie, S.H., S.E., M.Kn.,
S.E., M.Kn., Notaris di Jakarta Utara dan Akta Notary in North Jakarta and Deed No. 15 dated
No. 15 tertanggal 15 Februari 2022, yang dibuat 15 February 2022, made before Mahendra
di hadapan Mahendra Adinegara, S.H., M.Kn., Adinegara, S.H., M.Kn., Notary in South
Notaris di Jakarta Selatan, susunan anggota Jakarta, the composition of the Company’s
Direksi dan Dewan Komisaris Perusahaan pada Boards of Commissioners and Directors as at
tanggal 31 Desember 2023 adalah sebagai 31 December 2023 was as follows:
berikut:
Presiden Komisaris : Edwin Soeryadjaya : President Commissioner
Wakil Presiden Komisaris : Theodore Permadi Rachmat : Vice President Commissioner
Komisaris : Arini Saraswaty Subianto : Commissioner
Komisaris Independen : Mohammad Effendi : Independent Commissioners
Budi Bowoleksono
Presiden Direktur : Garibaldi Thohir : President Director
Wakil Presiden Direktur : Christian Ariano Rachmat : Vice President Director
Direktur : Julius Aslan : Directors
Chia Ah Hoo
M. Syah Indra Aman
Michael William P. Soeryadjaya
Susunan Komite Audit Perusahaan pada The composition of the Company’s Audit
tanggal 31 Desember 2024 dan 2023 adalah Committee as at 31 December 2024 and 2023
sebagai berikut: was as follows:
Ketua : Mohammad Effendi : Chairman
Anggota : Ignatius Robby Sani : Members
Lindawati Gani
Pada tanggal 31 Desember 2024, Perusahaan As at 31 December 2024, the Company and its
dan entitas anaknya (“Grup”) memiliki 10.356 subsidiaries (“Group”) had 10,356 permanent
karyawan tetap (tidak diaudit) (2023: 13.983 employees (unaudited) (2023: 13,983
karyawan tetap) (tidak diaudit). permanent employees) (unaudited).
b. Struktur grup b. Group structure
Pada tanggal 31 Desember 2024 dan 2023, As at 31 December 2024 and 2023, the
struktur Grup adalah sebagai berikut: structure of the Group was as follows:
Mulai beroperasi
Kegiatan komersial/ Persentase Total aset
usaha/ Commencement kepemilikan efektif/ (sebelum eliminasi)/
Business Kedudukan/ of commercial Effective percentage of Total assets
activity Domicile operations ownership (before elimination)
2024 2023 2024 2023
Entitas anak melalui kepemilikan langsung/Directly owned subsidiaries
PT Adaro Andalan Perdagangan Indonesia 2007 15% 100% - 6,740,632
Indonesia Tbk dan jasa/
(“Adaro”) a) b) c) Trading and
services
PT Saptaindra Jasa Indonesia 2002 100% 100% 879,249 853,185
Sejati (“SIS”) pertambangan/
Mining services
PT Alam Tri Bangun Investasi/ Indonesia - 100% 100% 189,616 204,757
Indonesia (“ATBI”) Investment
PT Adaro Minerals Jasa Indonesia 2016 84% 84% 2,073,595 1,695,420
Indonesia Tbk pertambangan/
(“AMI”) a) Mining services
PT Adaro Clean Energy Investasi/ Indonesia - 100% 100% 127,017 93,930
Indonesia (“ACEI”) a) Investment
a) dan entitas anaknya/and its subsidiaries
b) dahulu bernama PT Alam Tri Abadi/formerly named PT Alam Tri Abadi
c) Grup telah mengalami kehilangan pengendalian atas Adaro dan entitas anaknya pada tahun 2024/the Group has lost its control of Adaro and its subsidiaries in 2024
Page 25
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/4 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
b. Struktur grup (lanjutan) b. Group structure (continued)
Mulai beroperasi
Kegiatan komersial/ Persentase Total aset
usaha/ Commencement kepemilikan efektif/ (sebelum eliminasi)/
Business Kedudukan/ of commercial Effective percentage of Total assets
activity Domicile operations ownership (before elimination)
2024 2023 2024 2023
Entitas anak melalui kepemilikan langsung/Directly owned subsidiaries (lanjutan/continued)
PT Adaro Power Investasi/ Indonesia - 87% 100% 919,997 1,218,806
(“AP”) a) Investment
Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries
PT Adaro Indonesia Pertambangan/ Indonesia 1992 - 88% - 3,142,514
(“AI”) c) Mining
PT Dianlia Investasi/ Indonesia - - 100% - 78,518
Setyamukti Investment
(“Dianlia”) c)
PT Biscayne Investasi/ Indonesia - - 100% - 98
Investments Investment
(“Biscayne”) d)
PT Alam Tri Cakra Investasi/ Indonesia - 85% 100% 35,769 32,177
Indonesia (“ATCI”) Investment
PT Indonesia Bulk Jasa pengelolaan Indonesia 1997 - 100% - 62,653
Terminal (“IBT”) c) terminal/
Terminal
handling service
PT Adaro Persada Jasa/Services Indonesia 2006 - 100% - 81,489
Mandiri (“APM”) a) c)
Arindo Holdings Investasi/ Mauritius 2005 - 90% - 1,929,833
(Mauritius) Ltd Investment
(“Arindo
Holdings”) a) c)
Vindoor Investasi/ Mauritius 2001 - 90% - 1,390,052
Investments Investment
(Mauritius) Ltd
(“Vindoor”) a) c)
Adaro International Perdagangan Singapura/ 2001 - 90% - 909,977
(Singapore) batubara/ Singapore
Pte Ltd Coal trading
(“AIS”) c)
PT Viscaya Investasi/ Indonesia - - 100% - 460,386
Investments Investment
(“Viscaya”) c)
PT Sarana Daya Jasa/Services Indonesia 2009 - 30% - 14,069
Mandiri (“SDM”) c)
Orchard Maritime Penanganan dan Singapura/ 2006 - 100% - 271
Logistics Pte pengangkutan Singapore
Ltd (“OML”) c) batubara/Coal
handling and
barging
PT Adaro Logistics Jasa/Services Indonesia 2015 - 100% - 680,348
(“AL”) c)
PT Maritim Barito Pengangkutan Indonesia 2005 - 100% - 505,229
Perkasa laut/Sea
(“MBP”) c) transportation
PT Harapan Pengangkutan Indonesia 2004 - 100% - 23,454
Bahtera laut/Sea
Internusa transportation
(“HBI”) c)
PT Makmur Perdagangan dan Indonesia 2013 87% 100% 130,824 137,819
Sejahtera pembangkitan
Wisesa listrik/Trading
(“MSW”) and power
plant services
PT Puradika Bongkar Jasa/Services Indonesia 2013 - 100% - 10,943
Muat Makmur
(“PBMM”) c)
PT Rehabilitasi Jasa/Services Indonesia 2016 - 100% - 14,556
Lingkungan
Indonesia (“RLI”) a) c)
a) dan entitas anaknya/and its subsidiaries
c) Grup telah mengalami kehilangan pengendalian atas Adaro dan entitas anaknya pada tahun 2024/the Group has lost its control of Adaro and its subsidiaries in 2024
d) telah dilikuidasi/has been liquidated
Page 26
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/5 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
b. Struktur grup (lanjutan) b. Group structure (continued)
Mulai beroperasi
Kegiatan komersial/ Persentase Total aset
usaha/ Commencement kepemilikan efektif/ (sebelum eliminasi)/
Business Kedudukan/ of commercial Effective percentage of Total assets
activity Domicile operations ownership (before elimination)
2024 2023 2024 2023
Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)
PT Indonesia Multi Jasa pengelolaan Indonesia 2013 - 100% - 10,859
Purpose terminal/
Terminal (“IMPT”) c) Terminal
handling service
PT Mustika Indah Pertambangan/ Indonesia 2019 - 75% - 205,837
Permai (“MIP”) c) Mining
PT Bukit Enim Pertambangan/ Indonesia - - 61% - 1,377
Energi (“BEE”) e) Mining
PT Adaro Mining Jasa/Services Indonesia 2023 - 100% - 93,448
Technologies
(“AMT”) a) c)
PT Adaro Jasabara Jasa/Services Indonesia 2007 - 100% - 6,634
Indonesia
(“AJI”) c)
PT Adaro Tirta Aktivitas kantor Indonesia 2019 - 100% - 93,952
Mandiri (“ATM”) a) c) pusat dan
perdagangan/
Head office
and trading
PT Agri Multi Lestari Peternakan/ Indonesia 2016 - 100% - 5,588
(“AML”) c) Farming
PT Paramitha Cipta Pertambangan/ Indonesia 2024 - 75% - 59,173
Sarana (“PCS”) c) Mining
PT Semesta Pertambangan/ Indonesia 2014 - 75% - 193,542
Centramas (“SCM”) c) Mining
PT Laskar Semesta Pertambangan/ Indonesia 2016 - 75% - 244,814
Alam (“LSA”) c) Mining
PT Adaro Tirta Jasa penunjang Indonesia 2021 - 100% - 43,105
Sarana (“ATS”) a) c) pertambangan/
Mining support
service
PT Drupadi Tirta Pengolahan air/ Indonesia 2016 - 100% - 8,329
Intan (“DTI”) c) Water treatment
PT Adaro Tirta Pengolahan air/ Indonesia 2016 - 100% - 11,061
Gresik (“ATG”) c) Water treatment
PT Lahai Coal (“LC”) Pertambangan/ Indonesia 2016 84% 84% 110,652 107,051
Mining
PT Pari Coal (“PC”) c) Pertambangan/ Indonesia - - 65% - 8,877
Mining
PT Juloi Coal (“JC”) Pertambangan/ Indonesia - 84% 84% 26,653 28,451
Mining
PT Sumber Barito Pertambangan/ Indonesia - 84% 84% 2,173 2,512
Coal (“SBC”) Mining
PT Kalteng Coal (“KC”) Pertambangan/ Indonesia - 84% 84% 2,148 2,439
Mining
PT Maruwai Coal (“MC”) Pertambangan/ Indonesia 2020 84% 84% 1,210,115 1,185,897
Mining
PT Ratah Coal (“RC”) c) Pertambangan/ Indonesia - - 100% - 360
Mining
PT Batuan Anugerah Pertambangan/ Indonesia - 84% 84% 2,121 108
Semesta (“BAS”) f) Mining
Adaro Capital Investasi/ Malaysia 2017 - 90% - 847,938
Limited (“ACL”) c) Investment
PT Alam Sukses Lestari Kehutanan/ Indonesia 2018 - 100% - 2,669
(“ASL”) c) Forestry
PT Barito Galangan Pembuatan, Indonesia 2019 - 100% - 16,854
Nusantara (“BGN”) c) perbaikan dan
perawatan
angkutan laut/
Manufacture,
repair and
maintenance of
sea transportation
a) dan entitas anaknya/and its subsidiaries
c) Grup telah mengalami kehilangan pengendalian atas Adaro dan entitas anaknya pada tahun 2024/the Group has lost its control of Adaro and its subsidiaries in 2024
e) pada tanggal 8 Agustus 2024 Adaro telah melepas seluruh kepemilikan sahamnya pada BEE/on 8 August 2024, Adaro has divested all of its shares ownership in BEE
f) dahulu bernama PT Balangan Anugerah Semesta/formerly named PT Balangan Anugerah Semesta
Page 27
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/6 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
b. Struktur grup (lanjutan) b. Group structure (continued)
Mulai beroperasi
Kegiatan komersial/ Persentase Total aset
usaha/ Commencement kepemilikan efektif/ (sebelum eliminasi)/
Business Kedudukan/ of commercial Effective percentage of Total assets
activity Domicile operations ownership (before elimination)
2024 2023 2024 2023
Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)
PT Hutan Amanah Kehutanan/ Indonesia 2018 - 75% - 1,417
Lestari (“HAL”) c) Forestry
PT Adaro Tirta Pengolahan air/ Indonesia 2018 - 90% - 7,086
Mentaya (“ATME”) c) Water treatment
PT Adaro Wamco Pengolahan air Indonesia 2019 - 60% - 12,638
Prima (“AWP”) c) dan lumpur/
Water and mud
treatment
Adaro Australia Pty Ltd c) Investasi/ Australia 2021 - 90% - 452
Investment
PT Alam Tri Daya Investasi/ Indonesia - 84% 84% 1,342,386 1,301,915
Indonesia (“ATDI”) a) Investment
PT Sarana Mekar Investasi/ Indonesia - - 55% - 14,168
Pratama (“SMP”) a) c) Investment
PT Adaro Indo Investasi/ Indonesia - 84% 84% 629,421 303,491
Aluminium (“AIA”) a) Investment
PT Sarana Multi Jasa/Services Indonesia 2022 - 100% - 3,560
Talenta (“SMT”) c)
PT Batam Surya Investasi/ Indonesia - 65% 65% 33,165 7,577
Energi (“BSE”) a) Investment
PT Batam Sarana Penyediaan tenaga Indonesia - 65% 65% 33,146 7,550
Surya (“BSS”) listrik/Electric
power supply
PT Karimun Sarana Penyediaan tenaga Indonesia - 90% 90% 5,891 3,146
Surya (“KSS”) listrik/Electric
power supply
PT Persada Wana Kehutanan/ Indonesia - - 100% - 17
Lestari (“PWL”) c) Forestry
PT Cakra Wana Kehutanan/ Indonesia - - 100% - 323
Lestari (“CWL”) c) Forestry
PT Mandiri Wana Kehutanan/ Indonesia - - 100% - 17
Lestari (“MWL”) c) Forestry
PT Adaro Tirta Jasa penunjang Indonesia 2023 - 100% - 2,630
Wening (“ATW”) c) pengelolaan air/
Water treatment
support service
PT Kalimantan Pengolahan logam/ Indonesia - 54% 54% 626,344 294,975
Aluminium Metal
Industry (“KAI”) processing
PT Kaltara Power Penyewaan Indonesia - - 84% - 322,367
Indonesia (“KPI”) c) pembangkit listrik
dan jasa
penunjang tenaga
listrik/Lease of
power plant and
power plant
supporting
services
Adaro Solar Transmisi, distribusi Singapura/ - 100% 100% 212 149
International Pte Ltd dan penjualan Singapore
(“ASIN”) tenaga listrik/
Transmission,
distribution and
sale of electricity
PT Adaro Tirta Pengolahan air/ Indonesia - - 100% - 5,722
Brayan (“ATB”) c) Water treatment
PT Kalimantan Energi Investasi/ Indonesia - 100% 100% 71,340 72,026
Hijau (“KEH”) a) Investment
PT Pembangkit Penyedia tenaga Indonesia - 100% 100% 4 7
Indonesia listrik/Electric
Alfa (“PIA”) power supply
PT Pembangkit Penyedia tenaga Indonesia - 100% 100% 3 3
Indonesia listrik/Electric
Gamma (“PIG”) power supply
a) dan entitas anaknya/and its subsidiaries
c) Grup telah mengalami kehilangan pengendalian atas Adaro dan entitas anaknya pada tahun 2024/the Group has lost its control of Adaro and its subsidiaries in 2024
Page 28
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/7 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
b. Struktur grup (lanjutan) b. Group structure (continued)
Mulai beroperasi
Kegiatan komersial/ Persentase Total aset
usaha/ Commencement kepemilikan efektif/ (sebelum eliminasi)/
Business Kedudukan/ of commercial Effective percentage of Total assets
activity Domicile operations ownership (before elimination)
2024 2023 2024 2023
Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)
PT Pembangkit Penyedia tenaga Indonesia - 100% 100% 91 94
Indonesia listrik/Electric
Delta (“PID”) power supply
PT Pembangkit Penyedia tenaga Indonesia - 100% 100% 1,070 995
Indonesia Eta listrik/Electric
(“PIEta”) power supply
PT Pembangkit Penyedia tenaga Indonesia - 100% 100% 2,596 2,972
Indonesia listrik/Electric
Epsilon (“PIEps”) power supply
PT Pembangkit Penyedia tenaga Indonesia - 100% 100% 3 5
Indonesia listrik/Electric
Zeta (“PIZ”) power supply
PT Mentarang Tirta Investasi/ Indonesia - 100% 100% 64,668 59,402
Energi (“MTE”) Investment
PT Adaro Baterai Investasi/ Indonesia - 84% 84% 634,655 308,839
Indonesia (“ABI”) a) Investment
PT Karimun Industri Investasi/ Indonesia - 90% 90% 5,901 3,159
Surya Semesta Investment
(“KISS”) a)
PT Adaro Sarana Energi Penyedia tenaga Indonesia - 100% 100% 261 145
Terbarukan (“ASET”) listrik/Electric
power supply
PT Indoprima Niaga Investasi/ Indonesia - - 65% - 12,827
Sejahtera (“INS”) a) c) Investment
PT Indotama Semesta Jasa pertambangan/ Indonesia - - 65% - 10,932
Manunggal Mining services
(“INDOTAMA”) c)
PT Indovisi Sentosa Kepelabuhan/ Indonesia - - 65% - 1,832
Mandiri (“ISM”) c) Port
PT Mitra Rimba Usaha kehutanan/ Indonesia - - 65% - 149
Indoprima (“MRI”) c) Forestry business
PT Indo Mitra Jasa pertambangan/ Indonesia - - 65% - 149
Konstruksi (“IMK”) c) Mining services
PT Adaro Wind Investasi/ Indonesia - 100% 100% 273 285
Energy (“AWE”) Investment
PT Jaringan Interkoneksi Transmisi tenaga Indonesia - 100% 100% 3,012 12
Karimun Abadi listrik/Electricity
(“JIKA”) transmission
PT Jaringan Interkoneksi Transmisi tenaga Indonesia - 100% 100% 646 12
Batam Abadi listrik/Electricity
(“JIBA”) transmission
PT Koridor Anugerah Investasi/ Indonesia - 100% - 279 -
Mentari Indonesia Investment
(“KAMI”) g)
PT Harapan Insani Kawasan industri/ Indonesia - - - - -
Millenia (“HIM”) f) c) Industrial estate
PT Basalt Sinar Lestari Penggalian batu, Indonesia - 84% - 7 -
(“BASL”) e) pasir dan tanah
liat lainnya/Stone
sand and other
clays quarrying
PT Bumi Alam Seraya Pertambangan batu Indonesia 2024 84% - 1,734 -
(“BASR”) f) kapur/Limestone
mining
PT Adaro Jasa Tirta Jasa penunjang Indonesia 2024 - - - -
(“AJT”) e) c) pengelolaan air/
Water treatment
support service
a) dan entitas anaknya/and its subsidiaries
c) Grup telah mengalami kehilangan pengendalian atas Adaro dan entitas anaknya pada tahun 2024/the Group has lost its control of Adaro and its subsidiaries in 2024
e) didirikan pada tahun 2024/established in 2024
f) diakuisisi pada tahun 2024/acquired in 2024
Page 29
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/8 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
c. IUPK sebagai Kelanjutan Operasi c. IUPK for the Continuation of
Kontrak/Perjanjian Contract/Agreement Operation
Kegiatan AI berdasarkan Perjanjian Karya AI’s activities were governed by the provisions
Pengusahaan Pertambangan Batubara of a Coal Cooperation Agreement (“CCA”)
(“PKP2B”) antara AI dan PT Tambang which was entered into by AI and
Batubara Bukit Asam (Persero) Tbk (“PTBA”), PT Tambang Batubara Bukit Asam (Persero)
dahulu Perusahaan Negara Tambang Tbk (“PTBA”), formerly Perusahaan Negara
Batubara, tertanggal 16 November 1982. Tambang Batubara, on 16 November 1982.
Berdasarkan Keputusan Presiden No. Based on Presidential Decree No. 75/1996
75/1996, tertanggal 25 September 1996 dan dated 25 September 1996 and the
perubahan PKP2B No. J2/Ji.DU/52/82 antara amendment to CCA No. J2/Ji.DU/52/82
PTBA dan AI tertanggal 27 Juni 1997, semua between PTBA and AI on 27 June 1997, all of
hak dan kewajiban PTBA dalam PKP2B the rights and obligations of PTBA under the
dialihkan kepada Pemerintah Republik CCA were transferred to the Government of
Indonesia (“Pemerintah”) yang diwakili oleh the Republic of Indonesia (the “Government”)
Menteri Pertambangan dan Energi, efektif represented by the Minister of Mines and
sejak 1 Juli 1997. Energy, effective from 1 July 1997.
Berdasarkan ketentuan PKP2B, AI Under the terms of the CCA, AI acts as a
merupakan kontraktor Pemerintah yang contractor to the Government, and is
bertanggung jawab atas operasi responsible for coal mining operations in an
penambangan batubara di area yang area located in South Kalimantan. AI
berlokasi di Kalimantan Selatan. AI memulai commenced its 30-year operating period
periode operasi 30 tahunnya (kecuali (unless extended based on the terms and
diperpanjang berdasarkan persyaratan dan conditions in the CCA) on
ketentuan dalam PKP2B) pada tanggal 1 October 1992 with coal produced from the
1 Oktober 1992 dengan memproduksi Paringin area of interest. AI is entitled to
batubara di area of interest Paringin. AI berhak 86.5% of the coal produced, with the
atas 86,5% batubara yang diproduksi dan remaining 13.5% representing the
13,5% sisanya merupakan bagian Government’s share of production.
Pemerintah.
Pada tanggal 18 September 2014, AI telah On 18 September 2014, AI signed a
menandatangani Nota Kesepahaman (“MoU”) Memorandum of Understanding (“MoU”) with
dengan Pemerintah untuk memperbarui the Government to amend its CCA. This MoU
PKP2B AI. MoU ini ditandatangani dalam was signed within the framework of the
rangka proses renegosiasi penyesuaian renegotiation process for adjustment of the
PKP2B, yang hanya berkaitan dengan enam CCA, which only related to six strategic
isu strategis yaitu: (i) Wilayah PKP2B, issues: (i) the CCA area, (ii) the continuation
(ii) Kelanjutan Operasi Pertambangan, of Mining Operations, (iii) State Revenue,
(iii) Penerimaan Negara, (iv) Kewajiban (iv) Obligations of Domestic Processing,
Pengolahan Dalam Negeri, (v) Kewajiban (v) Obligations to Divest, and (vi) Use of Local
Divestasi, dan (vi) Penggunaan Tenaga Kerja Labour, Goods and Domestic Services.
Lokal, Barang-Barang, dan Jasa Dalam
Negeri.
Pada tanggal 17 Januari 2018, AI telah On 17 January 2018, AI signed an
menandatangani amandemen PKP2B dengan amendment to the CCA (“Amendment to the
Pemerintah (“Amandemen PKP2B”). CCA”) with the Government. This amendment
Amandemen ini ditandatangan dengan tujuan was signed for the purpose of adjusting the
untuk menyesuaikan ketentuan PKP2B untuk provisions of the CCA to comply with the
memenuhi Undang-undang No. 4 Tahun 2009 provisions of Law No. 4 of 2009 on Mineral
tentang Pertambangan Mineral dan Batubara and Coal Mining pursuant to the requirements
sesuai dengan persyaratan sebagaimana as set forth in Article 169 of the said law.
dimaksud dalam Pasal 169.
Page 30
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/9 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
c. IUPK sebagai Kelanjutan Operasi c. IUPK for the Continuation of
Kontrak/Perjanjian (lanjutan) Contract/Agreement Operation (continued)
Pada tahun 2022, AI telah menerima Izin On 2022, AI has received a Special Mining
Usaha Pertambangan Khusus sebagai Business Permit for the Continuation of
Kelanjutan Operasi Kontrak/Perjanjian (“IUPK Contract/Agreement Operation (“IUPK for the
sebagai Kelanjutan Operasi Continuation of Contract/Agreement
Kontrak/Perjanjian”) yang diterbitkan oleh Operation”) issued by the Minister of
Menteri Investasi/Kepala Badan Koordinasi Investment/Chairman of the Investment
Penanaman Modal Republik Indonesia atas Coordinating Board of the Republic of
nama Menteri Energi dan Sumber Daya Indonesia on behalf of the Minister of Energy
Mineral tertanggal 13 September 2022. IUPK and Mineral Resources dated 13 September
sebagai Kelanjutan Operasi 2022. The IUPK for the Continuation of
Kontrak/Perjanjian ini telah diberikan untuk Contract/Agreement Operation has been
jangka waktu yang berakhir pada tanggal 1 granted for a period expiring on 1 October
Oktober 2032, yang dapat diperpanjang 2032, which can be extended in accordance
sesuai dengan ketentuan peraturan with the prevailing regulations.
perundang-undangan yang berlaku.
Mulai 1 Januari 2023, ketentuan perpajakan Starting 1 January 2023, the provisions on
dan/atau PNBP dilaksanakan sesuai dengan taxation and/or PNBP are implemented in
ketentuan dalam Peraturan Pemerintah No. accordance with the Government Regulations
15/2022 tentang Perlakuan Perpajakan No. 15/2022 Treatment of Taxation and/or
dan/atau Penerimaan Negara Bukan Pajak di Payments of Non-Tax State Revenue in the
Bidang Usaha Pertambangan Batubara coal mining sector (Note 41n).
(Catatan 41n).
d. Perjanjian Kerjasama IBT d. IBT Cooperation Agreement
Pada tanggal 25 Agustus 1990, IBT On 25 August 1990, IBT entered into a Basic
mengadakan Surat Perjanjian Dasar Agreement with PT Pelabuhan Indonesia III
Kerjasama dengan PT Pelabuhan Indonesia (Persero) (formerly Perum Pelabuhan III)
III (Persero) (dahulu Perum Pelabuhan III) (“Pelindo III”) for the construction,
(“Pelindo III”) untuk pembangunan, development and operation of a Public Coal
pengembangan, dan pengelolaan Pelabuhan Port in Pulau Laut, South Kalimantan.
Umum Batubara di Pulau Laut, Kalimantan On 10 November 1994, IBT and PT
Selatan. Pada tanggal 10 November 1994, IBT Pelabuhan Indonesia (Persero) (“Pelindo”)
dan PT Pelabuhan Indonesia (Persero) (formerly Pelindo III) amended the Basic
(“Pelindo”) (dahulu Pelindo III) mengubah Agreement to a Cooperation Agreement
Surat Perjanjian Dasar Kerjasama menjadi (“Cooperation Agreement”). Under the terms
Surat Perjanjian Kerjasama (“Perjanjian of the Cooperation Agreement, IBT
Kerjasama”). Berdasarkan Perjanjian commenced its 30-year operating period on
Kerjasama, IBT memulai periode operasi 21 August 1997.
30 tahunnya pada tanggal 21 Agustus 1997.
Perjanjian Kerjasama ini telah mengalami This Cooperation Agreement has been
beberapa kali perubahan antara lain, terkait amended several times, among others related
dengan royalti atau pembagian imbalan atas to royalties or the share of handling fees for
jasa pengelolaan terminal curah batubara dan the management services of the coal bulk
terminal curah cair, serta kategori aset IBT terminal and liquid bulk terminal and the
yang akan dialihkan menjadi milik Pelindo category of assets of IBT that will become the
setelah berakhirnya jangka waktu Perjanjian property of Pelindo upon the expiration of the
Kerjasama. Cooperation Agreement.
Page 31
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/10 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
d. Perjanjian Kerjasama IBT (lanjutan) d. IBT Cooperation Agreement (continued)
Pada tanggal 6 Desember 2022, IBT, Pelindo On 6 December 2022, IBT, Pelindo and PT
dan PT Pelindo Multi Terminal (“PMT”) telah Pelindo Multi Terminal (“PMT”) signed the
menandatangani Perjanjian Novasi Sebagian Partial Novation Agreement of the Cooperation
atas Perjanjian Kerjasama, sehubungan Agreement, wherein all of Pelindo’s authorities,
dengan seluruh tanggung jawab, hak dan rights, obligations and responsibilities relating to
kewajiban Pelindo atas share handling fees share handling fees and dock services under the
dan jasa dermaga berdasarkan Perjanjian Cooperation Agreement are transferred to PMT.
Kerjasama dialihkan kepada PMT.
Pada tanggal 4 Januari 2023, IBT dan PMT On 4 January 2023, IBT and PMT entered into
menandatangani Perjanjian Dasar Heads of Agreement in relation to the
sehubungan dengan rencana pengembangan development plan of cooperation in the
kerja sama pengoperasian fasilitas terminal di operations of terminal facilities at Mekar Putih
Pelabuhan Mekar Putih, Pulau Laut, Port, Pulau Laut, South Kalimantan.
Kalimantan Selatan.
Pada tanggal 25 Mei 2023, IBT mengakuisisi On 25 May 2023, IBT acquired 49% share of PT
49% saham PT Terminal Curah Utama Terminal Curah Utama (“TCU’) from PMT. TCU
(“TCU”) dari PMT. TCU bertanggung jawab has the responsibility to maintain the terminal
untuk memelihara fasilitas terminal bahan fuel facilities in Mekar Putih Port.
bakar di Pelabuhan Mekar Putih.
Pada tanggal 16 Agustus 2024, IBT, Pelindo On August 16, 2024, IBT, Pelindo and PMT
dan PMT telah menandatangani Perjanjian have signed a Cooperation Preparation
Persiapan Kerja Sama Penyelenggaraan Agreement for the Implementation of Terminal
Fasilitas Terminal di Pelabuhan Umum Mekar Facilities at Mekar Putih Port After the Expiration
Putih Setelah Berakhirnya Perjanjian of the Cooperation Agreement No.
Kerjasama No: 61/SPP.PR.129/PIII.94 61/SPP.PR.129/PP: 61/SPP.PR.129/PIII.94
tanggal 10 November 1994. Perjanjian ini dated November 10, 1994. This agreement
menyepakati skema dan rencana kerja sama agreed on the scheme and plan for further
lanjutan agar Grup dapat melanjutkan cooperation in order for the Group to continue
pemanfaatan Pelabuhan Mekar Putih setelah utilizing Mekar Putih Port after the build, operate
aset build, operate and transfer diserahkan and transfer asset is transferred to Pelindo,
kepada Pelindo, dengan berlandaskan janji- based on the promises of each party to sign
janji dari masing-masing pihak untuk derivative agreements.
menandatangani perjanjian turunan.
e. Perjanjian Kerjasama Pengelolaan Alur e. Ambang Barito River Channel Management
Ambang Sungai Barito Cooperation Agreement
Pada tanggal 28 Agustus 2007, PT Ambang On 28 August 2007, PT Ambang Barito
Barito Nusapersada (“Ambapers”) Nusapersada (“Ambapers”) appointed SDM as
menetapkan SDM sebagai pemenang mitra a partnership winner to execute the dredging of
kerja sama untuk melaksanakan pengerukan the Ambang Barito River Channel, which
Alur Ambang Sungai Barito, termasuk includes river-mouth dredging, maintenance
pengerukan mulut sungai, pemeliharaan, dan dredging and financing of the channel dredging
pembiayaan proyek pengerukan alur tersebut. project. On 25 March 2008, SDM entered into
Pada tanggal 25 Maret 2008, SDM an Ambang Barito River Channel Management
mengadakan Perjanjian Kerjasama Cooperation Agreement with Ambapers for a
Pengelolaan Alur Ambang Sungai Barito period of 15 years commencing its operation
dengan Ambapers untuk jangka waktu 15 date. Afterwards, SDM will be given the first right
tahun terhitung sejak tanggal operasionalnya. to consider an extension to extend for the next
Selanjutnya, SDM diberi hak pertama untuk five years. On 25 April 2022, SDM and
mempertimbangkan perpanjangan perjanjian Ambapers signed Amendment I to the Ambang
untuk lima tahun berikutnya. Pada tanggal 25 Barito River Channel Management Cooperation
April 2022, SDM dan Ambapers telah Agreement to extend the agreement period,
menandatangani Amandemen I Perjanjian therefore the agreement shall expire on 1
Kerjasama Pengelolaan Alur Ambang Sungai January 2029.
Barito untuk memperpanjang jangka waktu
perjanjian, sehingga jangka waktu perjanjian
akan berakhir pada tanggal 1 Januari 2029.
Page 32
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/11 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
e. Perjanjian Kerjasama Pengelolaan Alur e. Ambang Barito River Channel Management
Ambang Sungai Barito (lanjutan) Cooperation Agreement (continued)
Ambapers mengenakan pungutan jasa alur Ambapers charges a channel fee for every ship
untuk setiap kapal yang melalui Alur Ambang that passes through the Ambang Barito River
Sungai Barito sebagaimana diperkenankan Channel, to the extent permitted by the
berdasarkan peraturan perundang-undangan prevailing laws and regulations. Revenue from
yang berlaku. Pendapatan dari pengelolaan the management of channel fees is distributed
alur ini dibagi antara Ambapers dan SDM to Ambapers and SDM in the determined
berdasarkan proporsi yang telah ditetapkan. proportions.
f. Perjanjian Karya Pengusahaan f. Adaro MetCoal (“AMC”), PC and RC Coal
Pertambangan Batubara Adaro MetCoal Contracts of Work (“CCoWs”)
(“AMC”), PC dan RC
LC, JC, KC, MC dan SBC (secara keseluruhan LC, JC, KC, MC and SBC (collectively referred
dirujuk sebagai “entitas AMC”) serta PC dan to as the “AMC entities”) and also PC and RC
RC telah menandatangani PKP2B dengan have entered into CCoWs with the Government
Pemerintah untuk melakukan kegiatan to conduct coal mining activities as follows:
pengusahaan pertambangan batubara
sebagai berikut:
Tahun perolehan
surat keputusan
peningkatan Periode
Tanggal Luas wilayah tahap kegiatan permulaan
Tanggal
amandemen/ (tidak operasi dari operasi
Perusahaan/ perjanjian/
No. Amendment diaudit)/Area KESDM*)/ The penambangan/ Lokasi/Location
Company Agreement
date (unaudited) year of obtaining Commencement
date
(Hektar/Hectare) decision letter for of mining
production operations
operation stage
from MoEMR*)
1 PC 19 April 1999 14 November 24,971 2024 - Kalimantan Timur/East
2017 Kalimantan
2 RC 6 September 14 November 36,490 - - Kalimantan Timur dan
2000 2017 Kalimantan Tengah/East
Kalimantan and Central
Kalimantan
3 LC 6 September 14 November 46,620 Kalimantan Timur dan
2000 2017 2015 2016 Kalimantan Tengah/East
Kalimantan and Central
Kalimantan
4 JC 6 September 14 November 24,988 2020 - Kalimantan Tengah/Central
2000 2017 Kalimantan
5 KC 19 Februari/ 14 November 24,988 2020 - Kalimantan Tengah/Central
February 1998 2017 Kalimantan
6 MC 19 Februari/ 14 November 24,990 Kalimantan Timur dan
February 1998 2017 2017 2019 Kalimantan Tengah/East
Kalimantan and Central
Kalimantan
7 SBC 19 April 1999 14 November 24,993 2020 - Kalimantan Tengah/Central
2017 Kalimantan
*) Kementerian Energi dan Sumber Daya Mineral (“KESDM”) *) Ministry of Energy and Mineral Resources (“MoEMR”)
Berdasarkan PKP2B tersebut, periode Based on the CCoWs, the operating period of the
operasi wilayah pertambangan akan relevant areas of interest is for a 30-year period
berlangsung selama 30 tahun dari permulaan from the first coal mining operation, or a longer
operasi penambangan yang pertama, atau period agreed by the Government based on the
periode yang lebih lama yang dapat disetujui written requests from the AMC entities, PC or
oleh Pemerintah berdasarkan permohonan RC.
tertulis dari entitas-entitas AMC, PC atau RC.
Page 33
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/12 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
1. UMUM (lanjutan) 1. GENERAL (continued)
g. Izin Usaha Pertambangan g. Mining Business Permits
Selain IUPK sebagai Kelanjutan Operasi Other than the IUPK for the Continuation of
Kontrak/Perjanjian yang dimiliki oleh AI dan Contract/Agreement Operation entered into by AI
PKP2B yang dimiliki setiap entitas AMC, PC and the CCoWs entered into by the AMC entities,
dan RC, Grup memiliki izin usaha PC and RC, the Group had the following mining
pertambangan sebagai berikut: business permits:
Surat Keputusan/Decree Izin/Permit Periode/ Luas wilayah
Period (tidak diaudit)/
Lokasi/Location
Jenis/ Pemegang/ (Tahun/ Area (unaudited)
No. Nomor/Number Tanggal/Date Oleh/By
Type Holder Years) (Hektar/Hectare)
1 No. 503/188/KEP/ 29 April 2010 Bupati Lahat/ IUPOP MIP 20 2,000 Kabupaten Lahat,
PERTAMBEN/2010 Regent of Lahat Provinsi Sumatera
Selatan/Lahat
Regency, South
Sumatera
Province
2 No. 256/KPTS/ 9 Maret/ Bupati Muara IUPOP BEE 20 11,130 Kabupaten Muara
TAMBEN/2011 March 2011 Enim/Regent of Enim, Provinsi
Muara Enim Sumatera
Selatan/Muara
Enim Regency,
South Sumatera
Province
3 No. 0466 K/30/ 12 Februari/ KESDM/MoEMR IUPOP PCS 20 2,500 Kabupaten
MEM/2015* February sampai Balangan, Provinsi
2015 dengan/ Kalimantan
until Selatan/Balangan
2029 Regency, South
Kalimantan
Province
4 No. 0427 K/30/ 10 Februari/ KESDM/MoEMR IUPOP SCM 20 2,500 Kabupaten
MEM/2015* February sampai Balangan, Provinsi
2015 dengan/ Kalimantan
until Selatan/Balangan
2029 Regency, South
Kalimantan
Province
5 No. 0636 K/30/ 24 Februari/ KESDM/MoEMR IUPOP LSA 20 2,500 Kabupaten
MEM/2015 February sampai Balangan, Provinsi
2015 dengan/ Kalimantan
until Selatan/Balangan
2034 Regency, South
Kalimantan
Province
IUPOP: Izin Usaha Pertambangan Operasi dan Produksi/Operation and Production Mining Business Licence
*IUPOP yang diterbitkan berdasarkan Keputusan Bupati Balangan No. 188.45/83/Kum Tahun 2009 tanggal 8 April 2009 (PCS) dan Keputusan Bupati Balangan
No. 188.45/131/Kum Tahun 2009 tanggal 21 Juli 2009 (SCM), keduanya disesuaikan dengan keputusan Menteri Energi dan Sumber Daya Mineral (“Menteri ESDM”)
dalam rangka perubahan status keduanya menjadi Perusahaan Penanaman Modal Asing/IUPOP issued based on Decree of Regent of Balangan
No. 188.45/83/Kum Year 2009 dated 8 April 2009 (PCS) and Decree of Regent of Balangan No. 188.45/131/Kum Year 2009 dated 21 July 2009 (SCM), both adjusted
in accordance with the decree of the Minister of Energy and Mineral Resources (“Minister of EMR”) due to their change in status to Foreign Capital Investment
Companies
Page 34
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/13 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
Berikut ini adalah informasi kebijakan akuntansi Presented below are the material accounting policy
material yang diterapkan dalam penyusunan laporan information adopted in preparing the consolidated
keuangan konsolidasian Grup. Kebijakan ini telah financial statements of the Group. These policies
diaplikasikan secara konsisten terhadap semua have been consistently applied to all of the years
tahun yang disajikan, kecuali dinyatakan lain. presented, unless otherwise stated.
a. Dasar penyusunan laporan keuangan a. Basis of preparation of the consolidated
konsolidasian financial statements
Laporan keuangan konsolidasian Grup telah The Group’s consolidated financial
disusun berdasarkan Pernyataan Standar statements have been prepared in conformity
Akuntansi Keuangan dan Peraturan No. with Indonesian Financial Accounting
VIII.G.7 tentang “Penyajian dan Standards and Regulation No. VIII.G.7
Pengungkapan Laporan Keuangan Emiten regarding “Financial Statement Presentation
atau Perusahaan Publik”. and Disclosures of Issuers or Public
Companies”.
Laporan keuangan konsolidasian telah The consolidated financial statements have
disusun berdasarkan konsep harga been prepared under the historical cost
perolehan, kecuali untuk aset keuangan convention, except for financial assets which
tertentu yang diakui berdasarkan nilai wajar, are recognised at fair value, and using the
serta menggunakan dasar akrual kecuali accrual basis except for the consolidated
untuk laporan arus kas konsolidasian. statements of cash flows.
Penyusunan laporan keuangan konsolidasian The preparation of consolidated financial
berdasarkan Standar Akuntansi Keuangan di statements in conformity with Indonesian
Indonesia memerlukan penggunaan estimasi Financial Accounting Standards requires the
dan asumsi akuntansi penting tertentu. use of certain critical accounting estimates
Penyusunan laporan keuangan juga and assumptions. It also requires
mengharuskan manajemen untuk membuat management to exercise its judgement in the
pertimbangan dalam proses penerapan process of applying the Group’s accounting
kebijakan akuntansi Grup. Area-area yang policies. The areas involving a higher degree
memerlukan tingkat pertimbangan yang lebih of judgement or complexity, or areas where
tinggi atau kompleks, atau area dimana assumptions and estimates are significant to
asumsi dan estimasi yang berdampak the consolidated financial statements are
signifikan terhadap laporan keuangan disclosed in Note 3.
konsolidasian diungkapkan dalam Catatan 3.
Page 35
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/14 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
b. Perubahan pada Pernyataan Standar b. Changes to Statements of Financial
Akuntansi Keuangan (“PSAK”) dan Accounting Standards (“SFAS”) and
Interpretasi Pernyataan Standar Akuntansi Interpretations of Statements of Financial
Keuangan (“ISAK”) Accounting Standards (“IFAS”)
Penerapan dari amandemen terhadap standar The adoption of the following amendments to
akuntansi, yang berlaku efektif sejak tanggal accounting standards which are effective from
1 Januari 2024 berikut tidak menyebabkan 1 January 2024 did not result in substantial
perubahan signifikan atas kebijakan akuntansi changes to the Group’s accounting policies
Grup dan tidak memberikan dampak yang and had no material effect on the amounts
material terhadap jumlah yang dilaporkan di reported in the consolidated financial
laporan keuangan konsolidasian pada tahun statements for the current year:
berjalan:
• Amandemen PSAK No. 201, ”Penyajian • Amendment to SFAS No. 201,
Laporan Keuangan - Klasifikasi Liabilitas “Presentation of Financial Statements -
sebagai Jangka Pendek atau Jangka Classification of Liabilities as Current or
Panjang” Non-Current"
• Amandemen PSAK No. 201, “Penyajian • Amendment to SFAS No. 201,
Laporan Keuangan - Liabilitas Jangka “Presentation of Financial Statements -
Panjang dengan Kovenan” Long-term Liabilities with Covenants”
• Amandemen PSAK No. 207, “Laporan • Amendments to SFAS No. 207,
Arus Kas" dan PSAK No. 107, "Instrumen “Statement of Cash Flows” and SFAS No.
Keuangan: Pengungkapan” - Pengaturan 107, “Financial Instruments: Disclosure” -
Pembiayaan Pemasok Supplier Finance Arrangements
• Amandemen PSAK No. 116, “Sewa - • Amendment to SFAS No. 116, “Leases -
Liabilitas Sewa dalam Jual dan Sewa Lease Liability in a Sale and Leaseback”
Balik”
Standar baru dan amandemen yang telah The new standard and amendments issued
diterbitkan berlaku efektif untuk tahun buku effective for the financial year beginning
yang dimulai pada tanggal 1 January 2025 are as follows:
1 Januari 2025 adalah sebagai berikut:
• PSAK No. 117 “Kontrak Asuransi” • SFAS No. 117, “Insurance Contracts”
• Amandemen PSAK No. 221, “Pengaruh • Amendment to SFAS No. 221, “The Effect
Perubahan Kurs Valuta Asing – of Changes in Foreign Exchange Rates –
Kekurangan Ketertukaran” Lack of Exchangeability”
Standar baru dan amandemen di atas berlaku The above new standard and amendments are
efektif mulai 1 Januari 2025, dengan effective beginning 1 January 2025, with early
penerapan dini diperkenankan. adoption is permitted.
Pada tanggal penyelesaian laporan keuangan As at the completion date of these
konsolidasian ini, Grup sedang mempelajari consolidated financial statements, the Group
dampak yang mungkin timbul dari penerapan is evaluating the potential impact of the new
standar baru dan amandemen pada laporan standard and amendments on the Group’s
keuangan konsolidasian Grup. consolidated financial statements.
Page 36
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/15 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
c. Prinsip-prinsip konsolidasi c. Principles of consolidation
i. Entitas anak i. Subsidiaries
i.1. Konsolidasi i.1. Consolidation
Entitas anak merupakan semua Subsidiaries are all entities
entitas (termasuk entitas yang (including structured entities) over
terstruktur), dimana Grup memiliki which the Group has control. The
pengendalian. Grup mengendalikan Group controls an entity when the
suatu entitas ketika Grup memiliki Group is exposed to, or has rights to,
hak atas imbal hasil variabel dari variable returns from its involvement
keterlibatannya dengan suatu entitas with the entity and has the ability to
dan memiliki kemampuan untuk affect those returns through its
mempengaruhi imbal hasil tersebut power over the entity.
melalui kekuasaannya atas entitas
tersebut.
Entitas anak dikonsolidasi sejak Subsidiaries are consolidated from
tanggal pengendalian beralih kepada the date on which control is
Grup dan tidak lagi dikonsolidasi transferred to the Group and are
sejak tanggal hilangnya de-consolidated from the date on
pengendalian. which that control ceases.
Saldo, transaksi, penghasilan, dan Intragroup balances, transactions,
beban intra kelompok usaha income and expenses are
dieliminasi. Keuntungan dan eliminated. Profits and losses
kerugian hasil dari transaksi intra resulting from intragroup
kelompok usaha yang diakui dalam transactions that are recognised in
aset juga dieliminasi. Kebijakan assets are also eliminated. The
akuntansi entitas anak telah diubah accounting policies of subsidiaries
seperlunya untuk memastikan have been amended where
konsistensi penerapan kebijakan necessary to ensure consistency
oleh Grup. with the policies adopted by the
Group.
i.2. Akuisisi i.2. Acquisition
Grup menerapkan metode akuisisi The Group applies the acquisition
untuk mencatat setiap kombinasi method to account for business
bisnis. Imbalan yang dialihkan untuk combinations. The consideration
mengakuisisi entitas anak adalah transferred for the acquisition of a
nilai wajar seluruh aset yang subsidiary is the fair value of the
dialihkan, liabilitas yang diakui oleh assets transferred, the liabilities
pihak pengakuisisi kepada pemilik incurred to the former owners of the
sebelumnya dari entitas yang acquiree and the equity interests
diakuisisi dan kepentingan ekuitas issued by the Group.
yang diterbitkan oleh Grup.
Imbalan yang dialihkan termasuk nilai The consideration transferred
wajar setiap aset dan liabilitas yang includes the fair value of any asset
dihasilkan dari suatu kesepakatan or liability resulting from a contingent
imbalan kontinjensi. Aset consideration arrangement. Identifiable
teridentifikasi, liabilitas dan liabilitas assets acquired, liabilities and
kontinjensi yang diambil alih, yang contingent liabilities assumed in a
diperoleh dalam kombinasi bisnis business combination are measured
diukur pada awalnya sebesar nilai initially at their fair values as at the
wajar pada tanggal akuisisi. acquisition date.
Page 37
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/16 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
c. Prinsip-prinsip konsolidasi (lanjutan) c. Principles of consolidation (continued)
i. Entitas anak (lanjutan) i. Subsidiaries (continued)
i.2. Akuisisi (lanjutan) i.2. Acquisition (continued)
Grup mengakui kepentingan The Group recognises any
non-pengendali pada pihak yang non-controlling interest in the
diakuisisi baik sebesar nilai wajar acquiree on an acquisition-by-
atau sebesar bagian proporsional acquisition basis, either at fair value
kepentingan non-pengendali atas or at the non-controlling interest’s
aset neto teridentifikasi pihak proportionate share of the
yang diakuisisi. Kepentingan acquiree’s identifiable net assets.
non-pengendali disajikan di ekuitas Non-controlling interests are
dalam laporan posisi keuangan reported as equity in the
konsolidasian, terpisah dari ekuitas consolidated statements of financial
pemilik entitas induk. position, separate from the owners
of the parent entity.
Biaya terkait akuisisi dibebankan Acquisition-related costs are
pada saat terjadinya. expensed as incurred.
Jika kombinasi bisnis diperoleh If the business combination is
secara bertahap, Grup akan achieved in stages, the Group will
mengukur kepentingan ekuitas yang remeasure its previously held equity
sebelumnya dimiliki pada pihak yang interest in the acquiree at its fair
diakuisisi sebesar nilai wajar pada value at its acquisition date and
tanggal akuisisi dan mengakui recognise the resulting gain or loss,
keuntungan atau kerugian yang if any, in profit or loss. Any
dihasilkan, jika ada, dalam laba rugi. contingent consideration to be
Imbalan kontinjensi yang masih transferred by the Group is
harus dialihkan oleh Grup diakui recognised at its fair value as at the
sebesar nilai wajar pada tanggal acquisition date. Subsequent
akuisisi. Perubahan selanjutnya atas changes to the fair value of the
nilai wajar imbalan kontinjensi yang contingent consideration that is
diakui sebagai aset atau liabilitas dan deemed to be an asset or a liability
dicatat dalam laba rugi. Imbalan are recognised in profit or loss. A
kontinjensi yang diklasifikasikan contingent consideration that is
sebagai ekuitas tidak diukur kembali classified as equity is not
dan penyelesaian selanjutnya remeasured, and its subsequent
diperhitungkan dalam ekuitas. settlement is accounted for within
equity.
Page 38
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/17 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
c. Prinsip-prinsip konsolidasi (lanjutan) c. Principles of consolidation (continued)
i. Entitas anak (lanjutan) i. Subsidiaries (continued)
i.2. Akuisisi (lanjutan) i.2. Acquisition (continued)
Selisih lebih antara imbalan yang The excess of the consideration
dialihkan, jumlah setiap kepentingan transferred, the amount of any
non-pengendali dalam pihak yang non-controlling interests in the
diakuisisi, dan nilai wajar pada acquiree and the acquisition date fair
tanggal akuisisi dari kepemilikan value of any previous equity interest
ekuitas yang sebelumnya dimiliki in the acquiree over the fair value of
oleh pihak pengakuisisi pada pihak the Group’s share of the identifiable
yang diakuisisi, dibandingkan net assets acquired is recorded as
dengan nilai wajar bagian Grup atas goodwill. If those amounts are less
aset bersih teridentifikasi yang than the fair value of the net
diakuisisi, dicatat sebagai goodwill. identifiable assets of the subsidiary
Jika jumlah tersebut lebih kecil dari acquired and the measurement of all
nilai wajar atas aset bersih amounts has been reviewed, in the
teridentifikasi entitas anak yang case of a bargain purchase, the
diakuisisi dan pengukuran atas difference is recognised directly in
seluruh jumlah tersebut telah profit or loss.
ditelaah, dalam hal pembelian
dengan diskon, selisih tersebut
diakui secara langsung dalam laba
rugi.
ii. Perubahan kepemilikan atas entitas ii. Changes in ownership interest in
anak tanpa kehilangan pengendalian subsidiaries without loss of control
Transaksi dengan kepentingan non- Transactions with non-controlling
pengendali yang tidak mengakibatkan interests that do not result in a loss of
hilangnya pengendalian dicatat sebagai control are accounted for as equity
transaksi ekuitas. Selisih antara nilai transactions. The difference between the
wajar imbalan yang dibayarkan dan fair value of any consideration paid and
bagiannya atas jumlah tercatat aset neto the relevant share acquired of the carrying
yang diperoleh dicatat dalam ekuitas. amount of net assets of the subsidiary is
Keuntungan atau kerugian atas recorded in equity. Gains or losses on
pelepasan kepada kepentingan non- disposals to non-controlling interests are
pengendali juga dicatat pada ekuitas. also recorded in equity.
iii. Pelepasan entitas anak iii. Disposal of subsidiaries
Ketika Grup kehilangan pengendalian When the Group loses control of a
atas entitas anak, Grup menghentikan subsidiary, the Group derecognises the
pengakuan aset (termasuk setiap assets (including any goodwill) and
goodwill) dan liabilitas entitas anak pada liabilities of the subsidiary at their carrying
nilai tercatatnya ketika pengendalian amounts as at the date on which control is
hilang. Jumlah yang sebelumnya diakui lost. Amounts previously recognised in
dalam penghasilan komprehensif lain other comprehensive income are also
juga direklasifikasi ke laba rugi atau reclassified to profit or loss or transferred
dialihkan secara langsung ke saldo laba directly to retained earnings if required
jika disyaratkan oleh PSAK lain. under other SFAS.
Page 39
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/18 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
c. Prinsip-prinsip konsolidasi (lanjutan) c. Principles of consolidation (continued)
iii. Pelepasan entitas anak (lanjutan) iii. Disposal of subsidiaries (continued)
Sisa investasi pada entitas anak Any investment retained in the former
terdahulu diakui sebesar nilai wajarnya. subsidiary is recognised at its fair value.
Setiap perbedaan antara nilai tercatat The difference between the carrying
sisa investasi pada tanggal hilangnya amount of the investment retained at the
pengendalian dan nilai wajarnya diakui date when the control is lost and its fair
dalam laba rugi. value is recognised in profit or loss.
iv. Akuntansi entitas asosiasi dan ventura iv. Accounting for associates and joint
bersama ventures
Entitas asosiasi adalah suatu entitas An associate is an entity over which the
dimana Grup mempunyai pengaruh Group has significant influence, but not
signifikan, tetapi tidak mengendalikan, control, generally accompanied by a
dan biasanya Grup memiliki 20% atau shareholding giving rise to voting rights of
lebih hak suara, tetapi tidak melebihi 50% 20% or greater but not exceeding 50%.
hak suara. Investasi pada entitas asosiasi Investments in associates are accounted
dicatat pada laporan keuangan for in the consolidated financial
konsolidasian menggunakan metode statements using the equity method less
ekuitas dikurangi kerugian penurunan impairment losses, if any.
nilai, jika ada.
Ventura bersama merupakan pengaturan A joint venture is a joint arrangement in
bersama antara beberapa pihak yang which the parties that share joint control
melakukan kesepakatan pengendalian have rights to the net assets of the
bersama yang memiliki hak atas aset neto arrangement. Joint ventures are
pengaturan tersebut. Ventura bersama ini accounted for using the equity method
menggunakan metode ekuitas dikurangi less impairment losses, if any.
kerugian penurunan nilai, jika ada.
- Akuisisi - Acquisitions
Investasi pada entitas asosiasi atau Investment in an associate or a joint
ventura bersama pada awalnya venture is initially recognised at cost.
diakui sebesar biaya perolehan. The cost of an acquisition is
Biaya perolehan diukur berdasarkan measured at the fair value of the
nilai wajar aset yang diserahkan, assets transferred, equity
instrumen ekuitas yang diterbitkan instruments issued or liabilities
atau liabilitas yang timbul atau incurred or assumed as at the date of
diambil alih pada tanggal akuisisi, exchange, plus costs directly
ditambah biaya yang berhubungan attributable to the acquisition.
langsung dengan akuisisi.
Goodwill pada akuisisi entitas Goodwill on the acquisition of an
asosiasi atau ventura bersama associate or a joint venture
merupakan selisih lebih yang terkait represents the excess of the cost of
dengan biaya perolehan investasi acquisition of the associate or joint
pada entitas asosiasi atau ventura venture over the Group’s share of the
bersama dengan bagian Grup atas fair value of the identifiable net
nilai wajar neto aset teridentifikasi assets of the associate or joint
dari entitas asosiasi atau ventura venture and is included in the
bersama dan dimasukkan dalam carrying amount of the investment.
jumlah tercatat investasi.
Page 40
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/19 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
c. Prinsip-prinsip konsolidasi (lanjutan) c. Principles of consolidation (continued)
iv. Akuntansi entitas asosiasi dan ventura iv. Accounting for associates and joint
bersama (lanjutan) ventures (continued)
- Metode ekuitas - Equity method
Dalam menerapkan metode ekuitas, In applying the equity method of
bagian Grup atas laba rugi entitas accounting, the Group’s share of its
asosiasi atau ventura bersama associate’s or joint venture’s post-
setelah perolehan diakui dalam laba acquisition profit or loss is
rugi, dan bagian Grup atas recognised in profit or loss and its
penghasilan komprehensif lain share of post-acquisition other
setelah tanggal perolehan diakui comprehensive income is
dalam penghasilan komprehensif recognised in other comprehensive
lain. income.
Perubahan dan penerimaan These post-acquisition movements
distribusi dari entitas asosiasi atau and distributions received from an
ventura bersama setelah tanggal associate or a joint venture are
perolehan disesuaikan terhadap nilai adjusted against the carrying
tercatat investasi. amounts of the investment.
Jika bagian Grup atas rugi entitas When the Group’s share of the
asosiasi atau ventura bersama losses of an associate or a joint
sama dengan atau melebihi venture equals or exceeds its
kepentingannya pada entitas interest in the associate or joint
asosiasi atau ventura bersama, venture, including any other
termasuk piutang tidak lancar tanpa unsecured non-current receivables,
jaminan, maka Grup menghentikan the Group does not recognise further
pengakuan bagiannya atas rugi lebih losses, unless it has obligations to
lanjut, kecuali Grup memiliki make or has made payments on
kewajiban untuk melakukan behalf of the associate or joint
pembayaran atau telah melakukan venture.
pembayaran atas nama entitas
asosiasi atau ventura bersama.
Keuntungan yang belum direalisasi Unrealised gains on transactions
atas transaksi antara Grup dengan between the Group and its associate
entitas asosiasi atau ventura or joint venture are eliminated to the
bersama dieliminasi sebesar bagian extent of the Group’s interest in the
Grup dalam entitas asosiasi atau associate or joint venture.
ventura bersama tersebut. Kerugian Unrealised losses are also
yang belum direalisasi juga eliminated unless the transaction
dieliminasi kecuali transaksi tersebut provides evidence of impairment of
memberikan bukti penurunan nilai the asset being transferred. The
atas aset yang ditransfer. Kebijakan accounting policies of the associate
akuntansi entitas asosiasi atau or joint venture have been changed
ventura bersama akan disesuaikan, where necessary to ensure
apabila diperlukan, agar konsisten consistency with the accounting
dengan kebijakan akuntansi Grup. policies adopted by the Group.
Page 41
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/20 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
c. Prinsip-prinsip konsolidasi (lanjutan) c. Principles of consolidation (continued)
iv. Akuntansi entitas asosiasi dan ventura iv. Accounting for associates and joint
bersama (lanjutan) ventures (continued)
- Metode ekuitas (lanjutan) - Equity method (continued)
Dividen yang akan diterima dari Dividends receivable from an
entitas asosiasi atau ventura associate or a joint venture are
bersama diakui sebagai pengurang recognised as reductions in the
jumlah tercatat investasi. carrying amounts of the investment.
Pada setiap tanggal pelaporan, Grup At each reporting date, the Group
menentukan apakah terdapat bukti determines whether there is any
objektif bahwa telah terjadi objective evidence that the
penurunan nilai atas investasi pada investment in an associate or joint
entitas asosiasi atau ventura venture is impaired. If any such
bersama. Jika bukti tersebut ada, evidence exists, the Group
maka Grup menghitung besarnya calculates the amount of impairment
penurunan nilai sebagai selisih as the difference between the
antara jumlah yang terpulihkan dan recoverable amount of the associate
nilai tercatat atas investasi pada or the joint venture and its carrying
entitas asosiasi atau ventura amount and recognises the amount
bersama dan mengakui selisih in profit or loss.
tersebut pada laba rugi.
- Pelepasan - Disposals
Investasi pada entitas asosiasi atau An investment in an associate or a
ventura bersama dihentikan joint venture is derecognised when
pengakuannya apabila Grup tidak the Group loses significant influence
lagi memiliki pengaruh signifikan dan and joint control. The Group
pengendalian bersama. Grup measures the remaining investment
mengukur investasi yang tersisa at fair value. The difference between
sebesar nilai wajar. Selisih antara the carrying amount of the retained
jumlah tercatat investasi yang tersisa interest at the date when significant
pada tanggal hilangnya pengaruh influence is lost and its fair value is
signifikan dan nilai wajarnya diakui recognised in profit or loss.
dalam laba rugi.
Keuntungan dan kerugian yang Gains and losses arising from partial
timbul dari pelepasan sebagian atau disposal or dilution of an investment
dilusi yang timbul pada investasi in an associate or a joint venture in
pada entitas asosiasi atau ventura which significant influence and joint
bersama dimana pengaruh signifikan control is retained are recognised in
dan pengendalian bersama masih profit or loss, and only a
dipertahankan diakui dalam laba rugi proportionate share of the amount
dan hanya suatu bagian proporsional previously recognised in other
atas jumlah yang telah diakui comprehensive income is
sebelumnya pada penghasilan reclassified to profit or loss where
komprehensif lain yang direklasifikasi appropriate.
ke laba rugi.
Page 42
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/21 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
d. Penjabaran mata uang asing d. Foreign currency translation
i. Mata uang fungsional dan penyajian i. Functional and presentation currency
Akun-akun yang disertakan dalam Items included in the financial statements
laporan keuangan setiap entitas anggota of each of the Group’s entities are
Grup diukur menggunakan mata uang measured using the currency of the
dari lingkungan ekonomi utama dimana primary economic environment in which
entitas tersebut beroperasi (“mata uang the relevant entity operates (the
fungsional”). Laporan keuangan “functional currency”). The consolidated
konsolidasian disajikan dalam Dolar financial statements are presented in
Amerika Serikat (“AS$” atau “Dolar AS”), United States Dollars (“US$” or “US
yang merupakan mata uang fungsional Dollars”), which is the Company’s
Perusahaan dan penyajian Grup. functional currency and the Group’s
presentation currency.
ii. Transaksi dan saldo ii. Transactions and balances
Transaksi dalam mata uang asing Foreign currency transactions are
dijabarkan menjadi mata uang fungsional translated into the functional currency
menggunakan kurs yang berlaku pada using the exchange rates prevailing as at
tanggal transaksi. Pada tanggal the date of the transactions. As at the
pelaporan, setiap aset dan liabilitas reporting date, monetary assets and
moneter dalam mata uang asing liabilities denominated in foreign currency
disesuaikan untuk mencerminkan kurs are adjusted to reflect the prevailing
yang berlaku pada tanggal tersebut. exchange rates at such date. Foreign
Keuntungan dan kerugian selisih kurs exchange gains and losses resulting from
yang timbul dari penyelesaian transaksi the settlement of such transactions and
dalam mata uang asing dan dari from the translation at year-end
penjabaran aset dan liabilitas moneter exchange rates of monetary assets and
dalam mata uang asing menggunakan liabilities denominated in foreign
kurs yang berlaku pada akhir tahun currencies are recognised in profit or loss.
pelaporan diakui dalam laba rugi.
Kurs yang digunakan pada tanggal As at the consolidated statements of
laporan posisi keuangan konsolidasian, financial position dates, the exchange
berdasarkan kurs tengah yang diterbitkan rates used, based on the middle rates
Bank Indonesia, adalah sebagai berikut published by Bank Indonesia, were as
(dalam Dolar AS penuh): follows (full US Dollars amount):
2024 2023
Rupiah 10.000 (“Rp”) 0.62 0.65 Rupiah 10,000 (“Rp”)
Dolar Singapura (“S$”) 0.74 0.76 Singapore Dollars (“S$”)
Dolar Australia (“A$”) 0.62 0.69 Australian Dollars (“A$”)
Euro (“€”) 1.04 1.11 Euro (“€”)
Page 43
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/22 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
d. Penjabaran mata uang asing (lanjutan) d. Foreign currency translation (continued)
iii. Entitas dalam Grup iii. Group companies
Hasil usaha operasi dan posisi keuangan The results of the operations and financial
dari seluruh entitas anak Grup (tidak ada position of all of the Group’s subsidiaries
yang mata uang fungsionalnya mata uang (none of which has the currency of a
dari suatu ekonomi hiperinflasi) yang hyperinflationary economy) that have a
memiliki mata uang fungsional yang functional currency different from the
berbeda dengan mata uang penyajian Company’s presentation currency are
Perusahaan, ditranslasikan dalam mata translated into the Company’s
uang penyajian Perusahaan sebagai presentation currency as follows:
berikut:
(a) Aset dan liabilitas yang disajikan (a) The assets and liabilities presented
pada laporan posisi keuangan in the consolidated statements of
konsolidasian, dijabarkan pada kurs financial position are translated at
penutup tanggal laporan posisi the closing rate at the date of the
keuangan konsolidasian tersebut; consolidated statements of financial
position;
(b) Penghasilan dan beban untuk setiap (b) The income and expenses for each
pos laba rugi dijabarkan profit or loss item are translated at
menggunakan kurs rata-rata (kecuali the average exchange rates (unless
jika rata-rata tersebut bukan this average is not a reasonable
perkiraan wajar efek kumulatif dari approximation of the cumulative
kurs yang berlaku pada tanggal effect of the rates prevailing on the
transaksi, maka penghasilan dan transaction dates, in which case the
beban dijabarkan menggunakan kurs income and expenses are translated
tanggal transaksi); dan at the rates in force on the dates of
the transactions); and
(c) Seluruh selisih kurs yang timbul (c) All of the resulting exchange
diakui dalam penghasilan differences are recognised in other
komprehensif lain. comprehensive income.
Pada konsolidasi, selisih kurs yang timbul On consolidation, exchange differences
dari penjabaran investasi neto pada arising from the translation of any net
entitas asing dan instrumen keuangan investments in foreign entities and other
lainnya yang ditetapkan sebagai lindung financial instruments designated as
nilai atas investasi tersebut, diakui dalam hedges of such investments, are
penghasilan komprehensif lain. Ketika recognised in other comprehensive
investasi dijual, selisih kurs yang terkait income. When the investment is sold, the
direklasifikasi ke laba rugi. associated exchange differences are
reclassified to profit or loss.
e. Kas dan setara kas e. Cash and cash equivalents
Kas dan setara kas termasuk kas, kas di bank, Cash and cash equivalents consist of cash on
dan deposito berjangka yang jatuh tempo hand, cash in banks and time deposits with
dalam jangka waktu tiga bulan atau kurang maturity periods of three months or less at the
pada saat penempatan yang tidak digunakan time of placement that are not used as
sebagai jaminan atau tidak dibatasi collateral or are not restricted.
penggunaannya.
Laporan arus kas konsolidasian disusun The consolidated statements of cash flows
menggunakan metode langsung dengan have been prepared using the direct method
mengklasifikasikan arus kas berdasarkan by classifying the cash flows on the basis of
aktivitas operasi, investasi, dan pendanaan. operating, investing and financing activities.
Page 44
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/23 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
f. Piutang f. Receivables
Piutang usaha adalah jumlah terutang dari Trade receivables are amounts due from
pelanggan atas penjualan batubara dan listrik customers for coal and electricity sold or
atau jasa yang diberikan dalam kegiatan services performed in the ordinary course of
usaha biasa. Piutang non-usaha merupakan business. Non-trade receivables are amounts
jumlah terutang yang timbul dari transaksi di arising from transactions outside of the
luar kegiatan usaha biasa. Jika piutang ordinary course of business. If the collection of
diperkirakan tertagih dalam satu tahun atau the receivables is expected within one year or
kurang, piutang tersebut diklasifikasikan less, they are classified as current assets. If
sebagai aset lancar. Jika tidak, piutang not, they are presented as non-current assets
tersebut disajikan sebagai aset tidak lancar in the consolidated statements of financial
pada laporan posisi keuangan konsolidasian. position.
Piutang usaha pada awalnya diakui sebesar Trade receivables are recognised initially at
nilai wajar dan kemudian diukur sebesar biaya fair value and subsequently measured at
perolehan diamortisasi dengan menggunakan amortised cost using the effective interest
metode suku bunga efektif, jika efek method, if the impact of discounting is
pendiskontoan signifikan, dikurangi dengan significant, less any loss allowance.
cadangan kerugian.
Kerugian penurunan nilai piutang disajikan Impairment losses on receivables are
sebagai bagian dari beban usaha pada laba presented as part of operating expenses in
rugi. Jumlah yang selanjutnya dapat profit or loss. Subsequent recoveries of
dipulihkan kembali atas piutang yang amounts previously written off are credited
sebelumnya telah dihapusbukukan, against the same line item.
dikreditkan terhadap item baris yang sama.
Lihat Catatan 2i untuk informasi lebih lanjut See Note 2i for further information regarding
mengenai kebijakan penentuan jumlah the policy on the determination of the amount
cadangan kerugian piutang Grup. for the loss allowance on the Group’s
receivables.
Piutang non-usaha dari pihak berelasi pada Non-trade receivables from related parties are
awalnya disajikan sebagai aset tidak lancar initially presented as non-current assets
kecuali jika ada alasan tertentu untuk disajikan unless there are specific reasons for them to
sebagai aset lancar pada laporan posisi be presented as current assets in the
keuangan konsolidasian. consolidated statements of financial position.
g. Piutang dari pengaturan jasa konsesi g. Receivables from service concession
arrangements
Piutang yang timbul dari proyek konsesi Receivables due from the concession project
merupakan jasa yang diberikan sehubungan represent services provided in connection
dengan pengaturan konsesi jasa dimana with a service concession arrangement for
minimum pembayaran terjamin telah which guaranteed minimum payments have
disepakati terlepas dari jumlah pemakaian. been agreed upon irrespective of the extent of
Karena panjangnya rencana pembayaran, use. Due to the length of the payment plans,
piutang dicatat sebesar nilai kini dari receivables are the present value of future
penerimaan kas yang dijamin dan guaranteed cash receipts discounted using a
didiskontokan dengan menggunakan tingkat certain interest rate. The annual accumulation
suku bunga tertentu. Bunga piutang yang of interest on these receivables is presented
diakumulasikan dalam setahun dicatat as finance income from the service
sebagai pendapatan keuangan dari concession arrangement using the effective
pengaturan konsesi jasa dengan interest method. Payments will be divided into
menggunakan metode suku bunga efektif. a portion to be deducted from the receivables
Pembayaran akan dibagi menjadi bagian yang and interest on the unpaid amounts.
akan dikurangkan dari piutang dan bunga atas
jumlah yang belum dibayar.
Page 45
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/24 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
h. Persediaan h. Inventories
Persediaan batubara dinilai berdasarkan nilai Coal inventories are stated at the lower of cost
terendah antara harga perolehan atau nilai or net realisable value. Cost is determined
realisasi neto. Harga perolehan ditentukan based on the weighted average method which
dengan metode rata-rata tertimbang yang includes mining costs, direct labour costs,
mencakup biaya penambangan, biaya tenaga other direct costs and an appropriate portion
kerja langsung, biaya langsung lainnya, dan of fixed and variable overheads related to
alokasi bagian biaya overhead tetap dan mining operations. It excludes borrowing
variabel yang berkaitan dengan kegiatan costs. The net realisable value is the
penambangan. Biaya tersebut tidak termasuk estimated selling price in the ordinary course
biaya pinjaman. Nilai realisasi neto adalah of business less the estimated costs of
estimasi harga jual dalam kegiatan usaha completion and the estimated costs
biasa dikurangi estimasi biaya penyelesaian necessary to make the sale.
dan estimasi biaya yang diperlukan untuk
membuat penjualan.
Persediaan suku cadang, bahan bakar, dan Spare parts, fuel and supplies are valued at
perlengkapan dinilai dengan harga perolehan cost less a provision for obsolete and slow-
dikurangi dengan provisi persediaan usang moving items. Cost of spare parts and
dan bergerak lambat. Harga perolehan suku supplies is determined based on the moving
cadang dan perlengkapan ditentukan dengan average method while cost of fuel is
metode rata-rata bergerak sedangkan harga determined based on the weighted average
perolehan untuk bahan bakar ditentukan method. A provision for obsolete and slow-
dengan metode rata-rata tertimbang. Provisi moving items is determined on the basis of the
persediaan usang dan bergerak lambat estimated future usage or sale of individual
ditentukan berdasarkan estimasi penggunaan inventory items. Supplies of maintenance
atau penjualan masing-masing jenis materials are charged to production costs in
persediaan pada masa mendatang. Bahan the period in which they are used.
pendukung kegiatan pemeliharaan dicatat
sebagai beban produksi pada periode
digunakan.
i. Aset keuangan i. Financial assets
i. Klasifikasi, pengakuan dan i. Classification, recognition and
pengukuran measurement
Grup mengklasifikasikan aset keuangan The Group classifies its financial assets
dalam kategori berikut ini: into the following categories:
(i) aset keuangan diukur pada biaya (i) financial assets measured at
perolehan diamortisasi; dan amortised cost; and
(ii) aset keuangan diukur pada nilai wajar (ii) financial assets measured at fair
melalui laba rugi atau melalui value either through profit or loss
penghasilan komprehensif lain. (“FVTPL”) or through other
comprehensive income (“FVOCI”).
Klasifikasi ini tergantung pada model The classification depends on the
bisnis Grup dan persyaratan kontraktual Group’s business model and the
arus kas - apakah penentuan arus kasnya contractual terms of the cash flows when
semata dari pembayaran pokok dan determining whether their cash flows are
bunga. solely payments of principal and interest
(“SPPI”).
Grup menentukan klasifikasi aset The Group determines the classification
keuangan pada pengakuan awal. of its financial assets at initial recognition.
Page 46
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/25 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
i. Aset keuangan (lanjutan) i. Financial assets (continued)
i. Klasifikasi, pengakuan dan i. Classification, recognition and
pengukuran (lanjutan) measurement (continued)
(i). Aset keuangan diukur pada biaya (i). Financial assets measured at
perolehan diamortisasi amortised cost
Klasifikasi ini berlaku untuk This classification applies to debt
instrumen utang yang dikelola dalam instruments which are held under a
model bisnis “dimiliki untuk “hold to collect” business model
mendapatkan arus kas” dan memiliki and which have cash flows that
arus kas yang memenuhi kriteria meet the SPPI criteria.
“semata-mata dari pembayaran
pokok dan bunga”.
Pada pengakuan awal, piutang At initial recognition, trade
usaha yang tidak memiliki receivables that do not have a
komponen pendanaan yang significant financing component are
signifikan, diakui sebesar harga recognised at their transaction
transaksi. Aset keuangan lainnya price. Other financial assets are
awalnya diakui sebesar nilai wajar initially recognised at fair value plus
dikurangi biaya transaksi yang related transaction costs. They are
terkait. Aset keuangan ini subsequently measured at
selanjutnya diukur sebesar amortised cost using the effective
biaya perolehan diamortisasi interest method. Any gains or
menggunakan metode suku bunga losses on derecognition or
efektif. Keuntungan atau kerugian modification of a financial asset
pada penghentian atau modifikasi held at amortised cost are
aset keuangan yang dicatat pada recognised in profit or loss.
biaya perolehan diamortisasi diakui
pada laba rugi.
(ii). Aset keuangan diukur pada nilai (ii). Financial assets measured at
wajar melalui laba rugi FVTPL
Klasifikasi ini berlaku untuk aset The classification applies to the
keuangan berikut. Dalam semua following financial assets. In all
kasus, biaya transaksi dibebankan cases, transaction costs are
pada laba rugi: immediately expensed in profit or
loss:
- Instrumen utang yang tidak - Debt instruments that do not
memenuhi kriteria biaya meet the criteria of amortised
perolehan diamortisasi atau nilai cost or FVOCI. Subsequent fair
wajar melalui penghasilan value gains or losses are
komprehensif lain. Keuntungan recognised in profit or loss.
atau kerugian nilai wajar
selanjutnya akan dicatat pada
laba rugi.
- Investasi ekuitas yang dimiliki - Equity investments that are held
untuk diperdagangkan atau for trading or where FVOCI
dimana pilihan penghasilan election has not been applied.
komprehensif lain tidak berlaku. All fair value gains or losses and
Keuntungan atau kerugian nilai related dividend income are
wajar dan penghasilan dividen recognised in profit or loss.
terkait diakui pada laba rugi.
Page 47
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/26 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
i. Aset keuangan (lanjutan) i. Financial assets (continued)
i. Klasifikasi, pengakuan dan i. Classification, recognition and
pengukuran (lanjutan) measurement (continued)
(ii). Aset keuangan diukur pada nilai (ii). Financial assets measured at
wajar melalui laba rugi (lanjutan) FVTPL (continued)
- Derivatif yang bukan merupakan - Derivatives that are not
instrumen lindung nilai. designated as a hedging
Keuntungan atau kerugian nilai instrument. All subsequent fair
wajar selanjutnya diakui pada value gains or losses are
laba rugi. recognised in profit or loss.
- Aset keuangan dengan derivatif - Financial assets with embedded
melekat dipertimbangkan secara derivatives are considered in
keseluruhan saat menentukan their entirety when determining
apakah arus kasnya semata- whether their cash flows are
mata merupakan pembayaran SPPI.
pokok dan bunga.
(iii). Aset keuangan diukur pada nilai (iii). Financial assets measured at
wajar melalui penghasilan FVOCI
komprehensif lain
Klasifikasi ini berlaku untuk aset This classification applies to the
keuangan berikut ini: following financial assets:
- Instrumen utang yang dikelola - Debt instruments that are held
dengan model bisnis yang under a business model where
bertujuan untuk memiliki aset they are held for collection of
keuangan dalam rangka contractual cash flows and also
mendapatkan arus kas for sale (“collect and sell”) and
kontraktual dan untuk dijual dan which have cash flows that meet
di mana arus kasnya memenuhi the SPPI criteria.
kriteria “semata-mata dari
pembayaran pokok dan bunga”.
Perubahan nilai wajar aset All movements in the fair value
keuangan ini dicatat pada of these financial assets are
penghasilan komprehensif lain, taken through other
kecuali pengakuan keuntungan comprehensive income, except
atau kerugian penurunan nilai, for the recognition of impairment
pendapatan bunga (termasuk gains or losses, interest revenue
biaya transaksi menggunakan (including transaction costs by
metode suku bunga efektif), applying the effective interest
keuntungan atau kerugian yang method), gains or losses arising
timbul dari penghentian dan on derecognition and foreign
keuntungan dan kerugian dari exchange gains and losses that
selisih kurs diakui pada laba rugi. are recognised in profit or loss.
Ketika aset keuangan dihentikan, When the financial asset is
keuntungan atau kerugian nilai derecognised, the cumulative
wajar kumulatif yang sebelumnya fair value gains or losses
diakui pada penghasilan previously recognised in other
komprehensif lain direklasifikasi comprehensive income are
pada laba rugi. reclassified to profit or loss.
Page 48
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/27 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
i. Aset keuangan (lanjutan) i. Financial assets (continued)
i. Klasifikasi, pengakuan dan i. Classification, recognition and
pengukuran (lanjutan) measurement (continued)
(iii). Aset keuangan diukur pada nilai (iii). Financial assets measured at
wajar melalui penghasilan FVOCI (continued)
komprehensif lain (lanjutan)
- Investasi ekuitas di mana Grup - Equity investments where the
membuat pilihan yang Group has irrevocably elected to
takterbatalkan untuk menyajikan present fair value gains and
keuntungan dan kerugian nilai losses on revaluation in other
wajar dari revaluasi pada comprehensive income.
penghasilan komprehensif lain.
Pilihan ini dibuat berdasarkan The election is made on an
instrumen per instrumen, namun, instrument-by-instrument basis,
tidak berlaku pada investasi however, it is not applicable to
ekuitas yang dimiliki untuk equity investments held for
diperdagangkan. Keuntungan trading. Fair value gains or
atau kerugian nilai wajar dari losses on the revaluation of such
revaluasi investasi ekuitas, equity investments, including
termasuk komponen selisih kurs, any foreign exchange
diakui pada penghasilan component, are recognised in
komprehensif lain. Ketika other comprehensive income.
investasi ekuitas dihentikan When the equity investment is
pengakuannya, keuntungan atau derecognised, there is no
kerugian nilai wajar yang reclassification of fair value
sebelumnya diakui dalam gains or losses previously
penghasilan komprehensif lain recognised in other
tidak direklasifikasi pada laba comprehensive income to profit
rugi. Dividen diakui dalam laba or loss. Dividends are
rugi ketika hak untuk menerima recognised in profit or loss when
pembayaran telah ditetapkan. the right to receive payment is
established.
Grup mereklasifikasi investasi utang jika The Group reclassifies debt investments,
dan hanya jika model bisnis untuk if, and only if, the business model for
mengelola aset tersebut berubah. managing those assets changes.
Lihat Catatan 2j untuk rincian kebijakan Refer to Note 2j for details of the Group’s
akuntansi Grup atas instrumen keuangan accounting policy on derivative financial
derivatif. instruments.
ii. Penghentian pengakuan ii. Derecognition
Aset keuangan dihentikan pengakuannya Financial assets are derecognised when
ketika hak untuk menerima arus kas dari the rights to receive cash flows from the
investasi tersebut telah jatuh tempo atau investments have expired or have been
telah ditransfer dan Grup telah transferred and the Group has
mentransfer secara substansial seluruh transferred substantially all of the risks
risiko dan manfaat atas kepemilikan aset. and rewards of ownership.
Page 49
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/28 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
i. Aset keuangan (lanjutan) i. Financial assets (continued)
iii. Penurunan nilai aset keuangan iii. Impairment of financial assets
Grup menilai berdasarkan basis forward- The Group assesses on a forward-looking
looking untuk mengukur kerugian kredit basis, the expected credit losses (“ECL”)
ekspektasian terhadap aset keuangan associated with its financial assets carried
yang diukur pada biaya perolehan at amortised cost. The impairment
diamortisasi. Metode penurunan nilai method applied depends on whether
dilakukan dengan mempertimbangkan there has been a significant increase in
apakah risiko kredit telah meningkat credit risk.
secara signifikan.
Pada setiap periode pelaporan, Grup At each reporting date, the Group
menilai apakah risiko kredit dari assesses whether the credit risk on a
instrumen keuangan telah meningkat financial instrument has increased
secara signifikan sejak pengakuan awal. significantly since initial recognition.
Ketika melakukan penilaian, Grup When making the assessment, the Group
menggunakan perubahan atas risiko uses the change in the risk of a default
gagal bayar yang terjadi sepanjang occurring over the expected life of the
perkiraan usia instrumen keuangan financial instrument instead of the change
daripada perubahan atas jumlah kerugian in the amount of ECL. To make that
kredit ekspektasian. Dalam melakukan assessment, the Group compares the risk
penilaian, Grup membandingkan antara of a default occurring on the financial
risiko gagal bayar yang terjadi atas instrument as at the reporting date with
instrumen keuangan pada saat periode the risk of a default occurring on the
pelaporan dengan risiko gagal bayar yang financial instrument as at the date of initial
terjadi atas instrumen keuangan pada recognition and considers reasonable
saat pengakuan awal dan and supportable information, that is
mempertimbangkan informasi yang wajar available without undue cost or effort at
dan terdukung, yang tersedia tanpa biaya the reporting date about past events,
atau upaya berlebihan pada saat tanggal current conditions and forecasts of future
pelaporan terkait dengan kejadian masa economic conditions, that is indicative of
lalu, kondisi terkini dan perkiraan atas significant increases in credit risk since
kondisi ekonomi di masa depan, yang initial recognition.
mengindikasikan kenaikan risiko kredit
sejak pengakuan awal.
Grup menerapkan pendekatan yang The Group applies the “simplified
disederhanakan untuk mengukur approach” to measuring ECL which uses
kerugian kredit ekspektasian yang a lifetime expected loss allowance for all
menggunakan cadangan kerugian kredit trade receivables, other receivables and
ekspektasian seumur hidup untuk seluruh contract assets without significant
saldo piutang usaha, piutang lain-lain dan financing components and the “general
aset kontrak tanpa komponen pendanaan approach” for all other financial assets.
yang signifikan dan pendekatan umum The general approach incorporates a
untuk aset keuangan lainnya. review for any significant increase in
Pendekatan umum termasuk penelaahan counterparty credit risk since inception.
perubahan signifikan risiko kredit sejak The ECL reviews include assumptions
terjadinya. Penelaahan kerugian kredit about the risk of default and expected
ekspektasian termasuk asumsi mengenai loss rates. For trade receivables, the
risiko gagal bayar dan tingkat kerugian assessment considers the use of credit
ekspektasian. Untuk piutang usaha, enhancements, for example, letters of
dalam pengkajian juga credit and bank guarantees. To measure
mempertimbangkan penggunaan the ECL, trade receivables have been
peningkatan kredit, misalnya, letter of grouped based on similar credit risk
credit dan garansi bank. Untuk mengukur characteristics and the days past due.
kerugian kredit ekspektasian, piutang
usaha telah dikelompokkan berdasarkan
karakteristik risiko kredit dan jatuh tempo
yang serupa.
Page 50
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/29 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
i. Aset keuangan (lanjutan) i. Financial assets (continued)
iv. Saling hapus antar instrumen iv. Offsetting financial instruments
keuangan
Aset dan liabilitas keuangan saling hapus Financial assets and liabilities are offset
dan nilai netonya disajikan dalam laporan and their net amounts are reported
posisi keuangan konsolidasian jika in the consolidated statements of
terdapat hak yang dapat dipaksakan financial position when there is a legally
secara hukum untuk melakukan saling enforceable right to offset the recognised
hapus atas jumlah yang telah diakui amounts and there is an intention to settle
tersebut dan terdapat maksud untuk on a net basis or realise the asset and
menyelesaikan secara neto atau untuk settle the liability simultaneously.
merealisasikan aset dan menyelesaikan
liabilitas secara bersamaan.
j. Instrumen keuangan derivatif dan aktivitas j. Derivative financial instruments and
lindung nilai hedging activities
Instrumen keuangan derivatif pada awalnya Derivative financial instruments are initially
diakui sebesar nilai wajar tanggal kontrak recognised at fair value on the date on which
derivatif dimulai dan selanjutnya dinilai a derivative contract is entered into and are
kembali sebesar nilai wajarnya. Metode subsequently remeasured at their fair values.
pengakuan keuntungan atau kerugian yang The method of recognising the resulting gain
terjadi tergantung apakah derivatif tersebut or loss depends on whether the derivative is
merupakan instrumen lindung nilai dan jika designated as a hedging instrument and, if so,
demikian sifat objek yang dilindungi nilainya. on the nature of the item being hedged. The
Grup mengelompokkan derivatif tertentu Group designates certain derivatives as either
sebagai (a) lindung nilai atas nilai wajar aset (a) hedges of the fair value of recognised
atau liabilitas yang diakui atau komitmen pasti assets or liabilities or a firm commitment (fair
yang belum diakui (lindung nilai wajar); atau value hedge); or (b) hedges of a particular risk
(b) lindung nilai risiko tertentu yang terkait associated with a recognised asset or liability
dengan aset atau liabilitas atau transaksi yang or a highly probable forecast transaction (cash
diperkirakan kemungkinan besar terjadi flow hedge).
(lindung nilai arus kas).
Pada saat terjadinya transaksi, Grup At the inception of the transaction, the Group
mendokumentasi hubungan antara instrumen documents the relationship between hedging
lindung nilai dan item yang dilindung nilai, juga instruments and hedging items, as well as its
tujuan manajemen risiko dan strategi yang risk management objectives and the strategy
diterapkan dalam melakukan berbagai macam for undertaking hedging transactions. The
transaksi lindung nilai. Grup juga Group also documents its assessment, both at
mendokumentasikan penilaiannya, pada saat the hedge inception and on an ongoing basis,
terjadinya dan secara berkesinambungan, of whether the derivatives used in hedging
apakah derivatif yang digunakan untuk transactions are highly effective in offsetting
transaksi lindung nilai memiliki efektivitas yang changes in the fair value of or the cash flow
tinggi dalam rangka saling hapus perubahan from hedged items.
nilai wajar atau arus kas item yang dilindung
nilai.
Nilai penuh derivatif lindung nilai The full value of a hedging derivative is
dikelompokkan sebagai aset tidak lancar atau classified as a non-current asset or liability
liabilitas jangka panjang apabila jatuh tempo when the remaining maturity of the hedged
item yang dilindung nilai tersebut melebihi item is more than 12 months and as a current
12 bulan dan sebagai aset lancar atau liabilitas asset or liability when the remaining maturity
jangka pendek apabila jatuh tempo item of the hedged item is less than 12 months
lindung nilai tersebut kurang dari 12 bulan dari from the reporting date.
tanggal pelaporan.
Page 51
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/30 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
j. Instrumen keuangan derivatif dan aktivitas j. Derivative financial instruments and
lindung nilai (lanjutan) hedging activities (continued)
i. Lindung nilai atas nilai wajar i. Fair value hedge
Perubahan nilai wajar derivatif yang Changes in the fair values of derivatives
ditetapkan dan memenuhi kriteria sebagai that are designated and qualify as fair
lindung nilai atas nilai wajar, dicatat dalam value hedges are recognised in profit or
laba rugi, bersamaan dengan perubahan loss, together with any changes in the fair
yang terjadi pada nilai wajar aset atau value of the hedged asset or liability that
liabilitas lindung nilai terkait dengan risiko are attributable to the hedged risk. The
lindung nilai. Keuntungan atau kerugian gain or loss relating to the effective
yang terkait dengan bagian efektif lindung portion of such a fair value hedge is
nilai atas nilai wajar diakui dalam laba recognised in profit or loss in the same
rugi, di baris yang sama dengan line as the changes in fair value of the
perubahan nilai wajar item lindung nilai. hedged item to which it relates. The gain
Keuntungan atau kerugian yang terkait or loss relating to the ineffective portion
dengan bagian yang tidak efektif diakui is recognised immediately in profit or
dalam laba rugi. loss.
ii. Lindung nilai arus kas ii. Cash flow hedge
Bagian efektif perubahan nilai wajar The effective portion of changes in the
derivatif yang ditetapkan dan memenuhi fair value of derivatives that are
kriteria sebagai lindung nilai arus kas, designated and qualify as cash flow
diakui dalam penghasilan komprehensif hedges is recognised in other
lain. Keuntungan atau kerugian yang comprehensive income. The gain or loss
terkait bagian yang tidak efektif diakui relating to the ineffective portion is
dalam laba rugi. recognised immediately in profit or loss.
Jumlah yang diakumulasikan dalam Amounts accumulated in other
penghasilan komprehensif lain di ekuitas comprehensive income within equity are
direklasifikasi ke laba rugi pada saat item reclassified to profit or loss in the period
lindung nilai mempengaruhi laba rugi. when the hedged item affects profit or
Keuntungan atau kerugian terkait bagian loss. The gain or loss relating to the
efektif lindung nilai arus kas diakui dalam effective portion of the cash flow hedge
laba rugi, di baris yang sama dengan item is recognised in profit or loss in the same
lindung nilai. Akan tetapi, ketika proyeksi line as the hedged item to which it
transaksi yang dilindung nilai relates. However, when the forecast
menimbulkan aset non-keuangan transaction that is being hedged results
(contohnya persediaan atau aset tetap), in the recognition of a non-financial asset
keuntungan dan kerugian yang (for example, inventory or fixed assets),
sebelumnya ditangguhkan di ekuitas the gains and losses previously deferred
akan dialihkan dari ekuitas dan in equity are transferred from equity and
dimasukkan di dalam pengukuran awal included in the initial measurement of the
harga perolehan aset tersebut. Jumlah cost of the asset. The deferred amounts
yang ditangguhkan pada akhirnya diakui are ultimately recognised in the cost of
dalam akun beban pokok pendapatan revenue in the case of inventory or in
apabila terkait dengan persediaan atau depreciation expense in the case of fixed
dalam akun beban penyusutan apabila assets.
terkait dengan aset tetap.
Ketika instrumen lindung nilai kadaluarsa When a hedging instrument expires or is
atau dijual, atau ketika lindung nilai tidak sold, or when a hedge no longer meets
lagi memenuhi kriteria akuntansi lindung the criteria for hedge accounting, any
nilai, keuntungan atau kerugian kumulatif cumulative gain or loss existing in equity
yang ada di ekuitas saat itu tetap berada at that time remains in equity and is
di bagian ekuitas dan diakui pada saat recognised when the forecast
prakiraan transaksi terjadi dalam laba transaction is ultimately recognised in
rugi. Apabila prakiraan transaksi tidak lagi profit or loss. When a forecast
diharapkan akan terjadi, keuntungan atau transaction is no longer expected to
kerugian kumulatif yang telah dicatat di occur, the cumulative gain or loss that
bagian ekuitas segera dialihkan dalam was reported in equity is immediately
laba rugi. transferred to profit or loss.
Page 52
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/31 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
j. Instrumen keuangan derivatif dan aktivitas j. Derivative financial instruments and
lindung nilai (lanjutan) hedging activities (continued)
Perubahan nilai wajar dari derivatif yang tidak Changes in the fair value of any derivative
ditetapkan, atau tidak memenuhi kriteria instruments that are not designated as, or do
untuk, akuntansi lindung nilai diakui secara not qualify for, hedge accounting are
langsung dalam laba rugi. recognised immediately in profit or loss.
k. Aset tetap k. Fixed assets
Grup menganalisis fakta dan keadaan untuk The Group analyses the facts and
masing-masing jenis hak atas tanah dalam circumstances for each type of land rights in
menentukan akuntansi untuk masing-masing determining the accounting for each of its land
hak atas tanah tersebut sehingga dapat rights so that it accurately represents an
merepresentasikan dengan tepat suatu underlying economic event or transaction. If
kejadian atau transaksi ekonomis yang the land rights do not transfer control of the
mendasarinya. Jika hak atas tanah tersebut underlying assets to the Group, but give the
tidak mengalihkan pengendalian atas aset rights to use the underlying assets, the Group
pendasar kepada Grup, melainkan applies the accounting treatment for leases
mengalihkan hak untuk menggunakan aset under SFAS No. 116, “Leases”. If the land
pendasar, Grup menerapkan perlakuan rights are substantially similar to land
akuntansi atas transaksi tersebut sebagai purchases, the Group applies SFAS No. 216,
sewa berdasarkan PSAK No. 116, “Sewa”. “Property, plant and equipment” under which
Jika hak atas tanah secara substansi land rights are recognised at cost and not
menyerupai pembelian tanah, maka Grup depreciated.
menerapkan PSAK No. 216, “Aset tetap” yaitu
hak atas tanah diakui sebesar harga
perolehan dan tidak disusutkan.
Pada awalnya, semua aset tetap diakui Fixed assets are initially recognised at cost
sebesar harga perolehan dan setelahnya and subsequently carried at cost less
dicatat sebesar harga perolehan dikurangi accumulated depreciation and accumulated
akumulasi penyusutan dan akumulasi impairment losses. Fixed assets, except for
kerugian penurunan nilai. Aset tetap, kecuali the fixed assets of AI, LSA, SCM, MIP, PCS,
aset tetap AI, LSA, SCM, MIP, PCS entitas- the AMC entities, PC and RC, are depreciated
entitas AMC, PC dan RC, disusutkan hingga using the straight-line method to their residual
mencapai estimasi nilai sisa menggunakan values over their estimated useful lives as
metode garis lurus selama estimasi masa follows:
manfaatnya sebagai berikut:
Tahun/Years
Bangunan 10 - 30 Buildings
Infrastruktur 4 - 30 Infrastructure
Pembangkit listrik 25 Power plants
Mesin, peralatan operasional, Machineries, operational equipment
dan kendaraan 4 - 30 and vehicles
Kapal 5 - 25 Vessels
Peralatan kantor 2-8 Office equipment
Jalan dan jembatan 10 - 20 Roads and bridges
Page 53
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/32 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
k. Aset tetap (lanjutan) k. Fixed assets (continued)
Aset tetap AI, LSA, SCM, MIP, PCS, entitas- The fixed assets of AI, LSA, SCM, MIP, PCS,
entitas AMC, PC dan RC disusutkan the AMC entities, PC and RC are depreciated
menggunakan metode garis lurus selama using the straight-line method over the lesser
periode yang lebih rendah antara estimasi of the estimated useful lives of the assets, the
masa manfaat aset, umur tambang, atau masa life of the mine, or the term of the relevant
jangka waktu lisensi atau kontrak yang licence or contract, as follows:
relevan, sebagai berikut:
Tahun/Years
Bangunan 3 - 20 Buildings
Infrastruktur 3 - 20 Infrastructure
Mesin, peralatan operasional, Machineries, operational equipment
dan kendaraan 2 - 25 and vehicles
Peralatan kantor 2 - 10 Office equipment
Fasilitas peremukan dan pengolahan 2 - 30 Crushing and handling facilities
Jalan dan jembatan 2 - 30 Roads and bridges
Biaya-biaya yang terjadi setelah pengakuan Subsequent costs are included in the asset’s
awal diakui sebagai bagian nilai tercatat aset carrying amount or recognised as a separate
atau sebagai aset terpisah, sebagaimana asset, as appropriate, only when it is probable
mestinya, hanya jika kemungkinan besar Grup that future economic benefits associated with
akan mendapatkan manfaat ekonomis di the item will flow to the Group and the cost of
masa depan berkenaan dengan aset tersebut the item can be measured reliably. The
dan biaya perolehan aset dapat diukur dengan carrying amounts of the replaced parts are
andal. Nilai tercatat komponen yang derecognised. All other repairs and
digantikan dihapuskan. Biaya perbaikan dan maintenance are charged to profit or loss
pemeliharaan dibebankan dalam laba rugi during the financial year in which they are
dalam tahun buku ketika biaya-biaya tersebut incurred.
terjadi.
Masa manfaat, nilai sisa, dan metode The useful lives, residual values and
penyusutan aset tetap ditelaah, jika depreciation methods of fixed assets are
diperlukan, setidaknya disesuaikan, pada reviewed and adjusted if appropriate, at the
setiap akhir tahun buku. Dampak dari setiap end of each financial year. The effects of any
revisi diakui dalam laba rugi ketika perubahan revisions are recognised in profit or loss when
terjadi. the changes arise.
Nilai tercatat aset segera diturunkan sebesar An asset’s carrying amount is written down
jumlah yang dapat dipulihkan apabila nilai immediately to its recoverable amount if the
tercatat aset lebih besar daripada estimasi asset’s carrying amount is greater than its
jumlah yang dapat dipulihkan (Catatan 2m). estimated recoverable amount (Note 2m).
Nilai tercatat aset tetap yang tidak digunakan For assets which are no longer utilised or sold
lagi atau dijual atau diserahkan pada or surrendered to the Government, the
Pemerintah, dikeluarkan dari laporan carrying amounts are eliminated from the
keuangan konsolidasian, dan keuntungan consolidated financial statements and the
atau kerugian yang timbul akibat pelepasan resulting gains or losses on disposals of fixed
aset tetap tersebut diakui dalam laba rugi. assets are recognised in profit or loss.
Akumulasi biaya konstruksi bangunan, jalan The accumulated costs of the construction of
dan jembatan, infrastruktur, fasilitas buildings, roads and bridges, infrastructure,
peremukan dan pengolahan dan pemasangan crushing and handling facilities and the
mesin dikapitalisasi sebagai aset dalam installation of machineries are capitalised as
pembangunan. Biaya tersebut direklasifikasi construction in progress. These costs are
ke akun aset tetap pada saat proses reclassified to the fixed asset accounts when
konstruksi atau pemasangan selesai. the construction or installation is complete.
Penyusutan dimulai pada saat aset tersebut Depreciation is charged from the date on
siap untuk digunakan sesuai dengan tujuan which the assets are ready for use in the
yang diinginkan manajemen. manner intended by management.
Page 54
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/33 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
l. Goodwill l. Goodwill
Goodwill timbul dari akuisisi entitas anak dan Goodwill arises from the acquisition of
merupakan selisih imbalan yang ditransfer subsidiaries and represents the excess of the
terhadap kepemilikan dalam nilai wajar neto consideration transferred over the interest in
atas aset, liabilitas, dan liabilitas kontinjensi the net fair value of the net identifiable assets,
teridentifikasi dan nilai wajar kepentingan liabilities and contingent liabilities of the
non-pengendali pada pihak diakuisisi. acquiree and the fair value of the non-
controlling interest in the acquiree.
Untuk pengujian penurunan nilai, goodwill For the purposes of impairment testing,
yang diperoleh dalam kombinasi bisnis goodwill acquired in a business combination is
dialokasikan pada setiap Unit Penghasil Kas allocated to each Cash-Generating Unit
(“UPK”), atau kelompok UPK, yang (“CGU”), or group of CGUs, which is expected
diharapkan dapat memberikan manfaat dari to benefit from the synergies of the
sinergi kombinasi bisnis tersebut. Setiap unit combination. Each CGU or group of CGUs to
atau kelompok unit yang memperoleh alokasi which the goodwill is allocated represents the
goodwill merepresentasikan level terendah lowest level within the entity at which goodwill
dalam entitas yang goodwill-nya dipantau is monitored for internal management
untuk tujuan manajemen internal. Goodwill purposes. Goodwill is monitored at the
dipantau pada level segmen operasi. operating segment level.
m. Penurunan nilai dari aset non-keuangan m. Impairment of non-financial assets
Aset yang memiliki umur manfaat tidak Assets that have an indefinite useful life, for
terbatas, misalnya goodwill atau aset example, goodwill or intangible assets not
takberwujud yang belum siap digunakan, tidak ready to use, are not subject to amortisation
diamortisasi namun diuji penurunan nilainya but tested annually for impairment, or more
setiap tahun, atau lebih sering jika terdapat frequently if events or changes in
kejadian atau perubahan keadaan yang circumstances indicate that the carrying
mengindikasikan bahwa nilai tercatatnya amount may not be recoverable. Assets that
mungkin tidak dapat dipulihkan. Aset yang have a definite useful life are subject to
memiliki umur manfaat terbatas, diamortisasi amortisation or depreciation, and are
atau disusutkan, dan diuji untuk penurunan reviewed for impairment whenever events or
nilai jika terdapat kejadian atau perubahaan changes in circumstances indicate that the
keadaan yang mengindikasikan bahwa nilai carrying amount may not be recoverable. An
tercatatnya mungkin tidak dapat dipulihkan. impairment loss is recognised at the amount
Penurunan nilai diakui jika nilai tercatat aset by which the asset’s carrying amount exceeds
melebihi jumlah terpulihkannya. Jumlah its recoverable amount. The recoverable
terpulihkan merupakan jumlah yang lebih amount is the higher of an asset’s fair value
tinggi antara nilai wajar aset dikurangi biaya less costs of disposal and its value in use. For
untuk menjual dan nilai pakai aset. Dalam the purposes of assessing impairment, assets
menentukan penurunan nilai, aset are grouped at the lowest level for which there
dikelompokkan pada level yang paling rendah is separately identifiable cash flows. Non-
dimana terdapat arus kas yang dapat financial assets other than goodwill that suffer
diidentifikasi. Aset non-keuangan selain impairment are reviewed for possible reversal
goodwill yang mengalami penurunan nilai diuji of the impairment at each reporting date.
untuk menentukan apakah terdapat
kemungkinan pemulihan penurunan nilai,
pada setiap tanggal pelaporan.
Pembalikan rugi penurunan nilai, untuk aset Reversal of impairment losses for assets other
selain goodwill, diakui jika, dan hanya jika, than goodwill is recognised if, and only if,
terdapat perubahan estimasi yang digunakan there has been a change in the estimates
dalam menentukan jumlah terpulihkan aset used to determine the asset’s recoverable
sejak pengujian penurunan nilai terakhir kali. amount since the last impairment testing was
Pembalikan rugi penurunan nilai tersebut carried out. The reversal of impairment losses
diakui segera dalam laba rugi. Pembalikan will be recognised immediately in profit or loss.
tersebut tidak boleh mengakibatkan nilai The reversal should not result in the carrying
tercatat aset melebihi biaya perolehan amount of an asset exceeding what the
disusutkan sebelum adanya pengakuan depreciated cost would have been had the
penurunan nilai pada tanggal pembalikan impairment not been recognised at the date
dilakukan. Rugi penurunan nilai atas goodwill on which the impairment was reversed.
tidak dibalik lagi. Impairment losses relating to goodwill will not
be reversed.
Page 55
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/34 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
n. Aset eksplorasi dan evaluasi n. Exploration and evaluation assets
Aktivitas eksplorasi dan evaluasi meliputi Exploration and evaluation activity involves
mencari sumber daya mineral setelah Grup searching for mineral resources after the
memperoleh hak hukum untuk Group has obtained legal rights to explore in a
mengeksplorasi suatu wilayah tertentu, specific area, determining the technical
menentukan kelayakan teknis dan menilai feasibility and assessing the commercial
komersial atas sumber daya mineral spesifik. viability of an identified resource.
Pengeluaran eksplorasi dan evaluasi Exploration and evaluation expenditure
termasuk biaya yang berhubungan langsung includes costs that are directly attributable to:
dengan:
- perolehan hak untuk eksplorasi; - acquisition of rights to explore;
- kajian topografi, geologi, geokimia, dan - topographical, geological, geochemical
geofisika; and geophysical studies;
- pengeboran eksplorasi; - exploratory drilling;
- pemaritan dan pengambilan contoh; dan - trenching and sampling; and
- aktivitas yang terkait dengan evaluasi - activities involved in evaluating the
kelayakan teknis dan komersial atas technical feasibility and commercial
penambangan sumber daya mineral. viability of extracting mineral resources.
Biaya eksplorasi dan evaluasi yang Exploration and evaluation expenditure
berhubungan dengan suatu area of interest related to an area of interest is written off as
dibebankan pada saat terjadinya kecuali biaya incurred, unless it is capitalised and carried
tersebut dikapitalisasi dan ditangguhkan, forward, on an area of interest basis, provided
berdasarkan area of interest, apabila that one of the following conditions is met:
memenuhi salah satu dari ketentuan berikut
ini:
(i) terdapat hak untuk mengeksplorasi dan (i) the tenure rights of an area are current
mengevaluasi suatu area dan biaya and it is considered probable that the
tersebut diharapkan dapat diperoleh costs will be recouped through the
kembali melalui keberhasilan successful development and exploitation
pengembangan dan eksploitasi di area of of the area of interest or, alternatively,
interest tersebut atau melalui penjualan through its sale; or
atas area of interest tersebut; atau
(ii) kegiatan eksplorasi dalam area of interest (ii) exploration activities in the area of
tersebut belum mencapai tahap yang interest have not yet reached a stage that
memungkinkan penentuan adanya permits a reasonable assessment of the
cadangan terbukti yang secara ekonomis existence or otherwise of economically
dapat diperoleh, serta kegiatan yang aktif recoverable reserves and active and
dan signifikan dalam atau berhubungan significant operations in or in relation to
dengan area of interest tersebut masih the area of interest are ongoing.
berlanjut.
Biaya yang dikapitalisasi mencakup biaya- Capitalised costs include costs directly related
biaya yang berkaitan langsung dengan to exploration and evaluation activities in the
aktivitas eksplorasi dan evaluasi pada area of relevant area of interest, and exclude physical
interest yang relevan, tidak termasuk aset assets which are recorded in fixed assets.
berwujud yang dicatat sebagai aset tetap. General and administrative costs are
Biaya umum dan administrasi dialokasikan allocated to exploration or evaluation assets
sebagai aset eksplorasi atau evaluasi hanya only to the extent that those costs can be
jika biaya tersebut berkaitan langsung dengan related directly to operational activities in the
aktivitas operasional pada area of interest relevant area of interest.
yang relevan.
Pengeluaran eksplorasi dan evaluasi yang Capitalised exploration and evaluation
dikapitalisasi dihapusbukukan ketika kondisi expenditure is written off where the above
tersebut di atas tidak lagi terpenuhi. conditions are no longer satisfied.
Page 56
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/35 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
n. Aset eksplorasi dan evaluasi (lanjutan) n. Exploration and evaluation assets
(continued)
Aset eksplorasi dan evaluasi teridentifikasi Identifiable exploration and evaluation assets
yang diperoleh dalam suatu kombinasi bisnis acquired in a business combination are
pada awalnya diakui sebagai aset pada nilai recognised initially as assets at fair value upon
wajar pada saat akuisisi dan selanjutnya acquisition, and subsequently at cost less
diukur pada biaya perolehan dikurangi impairment charges. Exploration and
kerugian penurunan nilai. Pengeluaran evaluation expenditure incurred subsequent
eksplorasi dan evaluasi yang terjadi setelah to the acquisition of an exploration asset in a
perolehan aset eksplorasi dalam suatu business combination is accounted for in
kombinasi bisnis dicatat dengan mengacu accordance with the policy outlined above.
pada kebijakan akuntansi di atas.
Oleh karena aset eksplorasi dan evaluasi tidak As the exploration and evaluation assets are
tersedia untuk digunakan, maka aset tersebut not available for use, they are not depreciated.
tidak disusutkan.
Aset eksplorasi dan evaluasi diuji penurunan Exploration and evaluation assets are
nilainya ketika fakta dan kondisi assessed for impairment if facts and
mengindikasikan adanya penurunan nilai. circumstances indicate that impairment may
Aset eksplorasi dan evaluasi juga diuji exist. Exploration and evaluation assets are
penurunan nilainya ketika terjadi penemuan also tested for impairment once commercial
cadangan komersial, sebelum aset tersebut reserves are found, before the assets are
ditransfer ke “properti pertambangan - transferred to “mining properties - mines
tambang dalam pengembangan”. under development”.
Pengeluaran yang terjadi sebelum entitas Expenditure incurred before the entity
memperoleh hak hukum untuk obtained the legal right to explore a specific
mengeksplorasi suatu area spesifik area is expensed as incurred.
dibiayakan pada saat terjadinya.
o. Properti pertambangan o. Mining properties
Biaya pengembangan yang dikeluarkan oleh Development expenditure incurred by or on
atau atas nama Grup diakumulasikan secara behalf of the Group is accumulated separately
terpisah untuk setiap area of interest pada for each area of interest in which economically
saat cadangan terpulihkan yang secara recoverable resources have been identified.
ekonomis dapat diidentifikasi. Biaya tersebut Such expenditure includes costs directly
termasuk biaya yang dapat diatribusikan attributable to the construction of mines and
secara langsung pada konstruksi tambang related infrastructure and excludes physical
dan infrastruktur terkait, tidak termasuk biaya assets and land rights (i.e. right to build, right
aset berwujud dan hak atas tanah (seperti hak to cultivate and right to use), which are
guna bangunan, hak guna usaha, dan hak recorded as fixed assets.
pakai) yang dicatat sebagai aset tetap.
Ketika keputusan pengembangan telah Once a development decision has been
diambil, jumlah tercatat aset eksplorasi dan taken, the carrying amount of the exploration
evaluasi pada area of interest tertentu and evaluation assets in respect of the area of
dipindahkan sebagai “tambang dalam interest is transferred to “mines under
pengembangan” pada akun properti development” within mining properties and
pertambangan dan digabung dengan aggregated with the subsequent development
pengeluaran biaya pengembangan expenditure.
selanjutnya.
“Tambang dalam pengembangan” “Mines under development” are reclassified
direklasifikasi ke “tambang yang berproduksi” as “mines in production” within mining
pada akun properti pertambangan pada akhir properties at the end of the commissioning
tahap komisioning, ketika tambang tersebut phase, when the mine is capable of operating
dapat beroperasi sesuai dengan maksud in the manner intended by management.
manajemen.
Page 57
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/36 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
o. Properti pertambangan (lanjutan) o. Mining properties (continued)
“Tambang dalam pengembangan” tidak No amortisation is recognised for “mines under
diamortisasi sampai direklasifikasi menjadi development” until they are reclassified as
“tambang yang berproduksi”. “mines in production”.
Ketika timbul biaya pengembangan lebih When further development expenditure is
lanjut atas properti pertambangan setelah incurred on a mining property after the
dimulainya produksi, maka biaya tersebut commencement of production, the expenditure
akan dicatat sebagai bagian dari “tambang is carried forward as part of “mines in
yang berproduksi” apabila terdapat production” when it is probable that additional
kemungkinan besar tambahan manfaat future economic benefits associated with the
ekonomi masa depan sehubungan dengan expenditure will flow to the Group. Otherwise,
biaya tersebut akan mengalir ke Grup. such expenditure is classified as a cost of
Apabila tidak, biaya tersebut dibebankan production.
sebagai biaya produksi.
“Tambang yang berproduksi” (termasuk biaya “Mines in production” (including reclassified
eksplorasi, evaluasi dan pengembangan, exploration, evaluation and any development
serta pembayaran untuk memperoleh hak expenditure, and payments to acquire mineral
penambangan dan sewa) diamortisasi rights and leases) are amortised using the
dengan menggunakan metode unit produksi, units-of-production method, with separate
dengan perhitungan terpisah yang dibuat calculations being made for each area of
untuk setiap area of interest. “Tambang yang interest. “Mines in production” will be depleted
berproduksi” dideplesi menggunakan metode using the units-of-production method on the
unit produksi berdasarkan cadangan terbukti basis of proven and probable reserves.
dan cadangan terduga.
Properti pertambangan teridentifikasi yang Identifiable mining properties acquired in a
diperoleh melalui suatu kombinasi bisnis pada business combination are initially recognised
awalnya diakui sebagai aset sebesar nilai as assets at their fair value. Development
wajarnya. Pengeluaran pengembangan yang expenses incurred subsequent to the
terjadi setelah akuisisi properti pertambangan acquisition of the mining properties are
dicatat berdasarkan kebijakan akuntansi yang accounted for in accordance with the policy
dijelaskan di atas. outlined above.
“Tambang dalam pengembangan” dan “Mines under development” and “mines in
“tambang yang berproduksi” diuji penurunan production” are tested for impairment in
nilainya dengan mengacu pada kebijakan accordance with the policy described in
akuntansi pada Catatan 2m. Note 2m.
p. Biaya pengupasan tanah p. Stripping costs
Biaya pengupasan lapisan tanah merupakan Stripping costs are the costs of removing
biaya yang dikeluarkan untuk membuang overburden from a mine. Stripping costs
tanah penutup suatu tambang. Biaya incurred in the development of a mine before
pengupasan lapisan tanah yang terjadi pada production commences are capitalised as part
tahap pengembangan tambang sebelum of the cost of developing the mine and are
dimulainya produksi diakui sebagai biaya subsequently depleted using the units-of-
pengembangan tambang dan akan dideplesi production method on the basis of proven and
menggunakan metode unit produksi probable reserves.
berdasarkan cadangan terbukti dan cadangan
terduga.
Aktivitas pengupasan lapisan tanah yang Stripping activity conducted during the
terjadi selama tahap produksi mungkin production phase may provide two benefits
memiliki dua manfaat untuk kepentingan that accrue to the Group: (i) coal that is
Grup: (i) batubara yang dapat diproses untuk processed into inventory in the current year;
menjadi persediaan dalam tahun berjalan; dan and (ii) improved access to the coal body in
(ii) peningkatan akses ke badan batubara di future periods.
periode berikutnya.
Page 58
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/37 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
p. Biaya pengupasan tanah (lanjutan) p. Stripping costs (continued)
Sepanjang manfaat dari aktivitas pengupasan To the extent that the benefit from the
lapisan tanah dapat direalisasikan dalam stripping activity is realised in the form of
bentuk persediaan yang diproduksi dalam inventory produced, the Group accounts for
periode tersebut, Grup mencatat biaya atas the costs of this stripping activity in
aktivitas pengupasan lapisan tanah sesuai accordance with the principles of SFAS No.
dengan prinsip PSAK No. 202, “Persediaan”. 202, “Inventories”. To the extent the benefit is
Sepanjang biaya pengupasan lapisan tanah improved access to the coal body, the Group
memberikan manfaat peningkatan akses recognises these costs as a stripping activity
menuju badan batubara di periode yang akan asset if, and only if, all of the following criteria
datang, Grup mencatat biaya tersebut sebagai are met:
aset aktivitas pengupasan lapisan tanah, jika
dan hanya jika, memenuhi kriteria berikut:
1. Besar kemungkinan bahwa manfaat 1. It is probable that the future economic
ekonomik masa depan (peningkatan benefit (improved access to the coal
akses menuju badan batubara) yang body) associated with the stripping
terkait dengan aktivitas pengupasan activity will flow to the Group;
lapisan tanah akan mengalir kepada
Grup;
2. Grup dapat mengidentifikasi komponen 2. The Group can identify the component of
badan batubara yang aksesnya telah the coal body for which access has been
ditingkatkan; dan improved; and
3. Biaya aktivitas pengupasan lapisan tanah 3. The costs relating to the stripping activity
yang terkait dengan komponen tersebut associated with that component can be
dapat diukur secara andal. measured reliably.
Aset aktivitas pengupasan lapisan tanah pada A stripping activity asset is initially measured
awalnya diukur pada biaya perolehan, yang at cost, which represents the accumulation of
merupakan akumulasi dari biaya-biaya yang costs directly incurred to perform stripping
secara langsung terjadi untuk melakukan activity that improves access to the identified
aktivitas pengupasan lapisan tanah yang component of the coal body, plus an allocation
meningkatkan akses terhadap komponen of directly attributable overhead costs. If
badan batubara yang teridentifikasi, ditambah incidental operations are occurring at the
alokasi biaya overhead yang dapat same time as the production stripping activity,
diatribusikan secara langsung. Jika aktivitas but are not necessary for the production
insidentil terjadi pada saat yang bersamaan stripping activity to continue as planned, the
dengan pengupasan lapisan tanah tahap costs associated with these incidental
produksi, namun aktivitas insidentil tersebut operations are not included in the cost of the
tidak harus ada untuk melanjutkan aktivitas stripping activity asset.
pengupasan lapisan tanah sebagaimana
direncanakan, biaya yang terkait dengan
aktivitas insidentil tersebut tidak dapat
dimasukkan sebagai biaya perolehan aset
aktivitas pengupasan lapisan tanah.
Ketika biaya perolehan aset aktivitas When the costs of the stripping activity asset
pengupasan lapisan tanah dan persediaan and the inventory produced are not separately
yang diproduksi tidak dapat diidentifikasi identifiable, the Group allocates the
secara terpisah, Grup mengalokasikan biaya production stripping costs between the
pengupasan lapisan tanah dalam tahap inventory produced and the stripping activity
produksi antara persediaan yang diproduksi asset using an allocation basis that is based
dan aset aktivitas pengupasan lapisan tanah on a relevant production measure. This
menggunakan dasar alokasi berdasarkan production measure is calculated for the
ukuran produksi yang relevan. Ukuran identified component of the coal body, and is
produksi tersebut dihitung untuk komponen used as a benchmark to identify the extent to
badan batubara teridentifikasi, dan digunakan which the additional activity of creating a
sebagai patokan untuk mengidentifikasi future benefit has taken place. The Group
sejauh mana aktivitas tambahan yang uses the expected volume of waste extracted
menciptakan manfaat di masa depan telah compared with the actual volume for a given
terjadi. Grup menggunakan ekspektasi volume of coal production.
volume material sisa tambang yang diekstrak
dibandingkan dengan volume aktual untuk
setiap volume produksi batubara.
Page 59
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/38 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
p. Biaya pengupasan tanah (lanjutan) p. Stripping costs (continued)
Setelah pengakuan awal, aset aktivitas Subsequently, the stripping activity asset is
pengupasan lapisan tanah dicatat carried at cost less amortisation and
menggunakan biaya perolehan dikurangi impairment losses, if any. The stripping activity
dengan amortisasi dan rugi penurunan nilai, asset is amortised using the
jika ada. Aset aktivitas pengupasan lapisan units-of-production method over the expected
tanah diamortisasi menggunakan metode unit useful life of the identified component of the
produksi selama ekspektasi masa manfaat coal body that becomes more accessible as a
dari komponen badan batubara yang result of the stripping activity unless another
teridentifikasi yang menjadi lebih mudah method is more appropriate.
diakses sebagai akibat dari aktivitas lapisan
pengupasan tanah, kecuali terdapat metode
lain yang lebih tepat.
Perubahan pada ekspektasi masa manfaat Changes to the expected useful life of the
dari komponen badan batubara yang identified component of the coal body are
teridentifikasi dinyatakan sebagai perubahan considered changes in estimates and are
atas estimasi dan dicatat menggunakan basis accounted for on a prospective basis.
prospektif.
Aset aktivitas pengupasan lapisan tanah A stripping activity asset is accounted for as
dicatat sebagai penambahan atau an addition to, or enhancement of, an existing
peningkatan dari aset yang ada, sehingga asset, and therefore is presented as part of
disajikan sebagai “properti pertambangan” “mining properties” in the consolidated
pada laporan posisi keuangan konsolidasian. statements of financial position.
Aset aktivitas pengupasan lapisan tanah Any stripping activity asset is included in the
dimasukan ke dalam basis biaya perolehan cost base of assets when determining a CGU
aset saat penentuan UPK dalam tujuan for impairment assessment purposes.
pengujian penurunan nilai.
Pada tanggal laporan keuangan konsolidasian As at the date of these consolidated financial
ini, Grup tidak memiliki biaya pengupasan statements, the Group did not have stripping
lapisan tanah selama tahap produksi yang costs during the production phase which
memenuhi kriteria untuk ditangguhkan seperti qualify for deferral in accordance with the
yang ditetapkan dalam kebijakan akuntansi Group’s accounting policies.
Grup.
Page 60
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/39 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
q. Utang usaha q. Trade payables
Utang usaha adalah kewajiban untuk Trade payables are obligations to pay for
membayar barang atau jasa yang telah goods or services that have been acquired in
diterima dalam kegiatan usaha normal dari the ordinary course of business from
pemasok. Utang usaha diklasifikasikan suppliers. Trade payables are classified as
sebagai liabilitas jangka pendek apabila current liabilities if payment is due within one
pembayarannya jatuh tempo dalam waktu year of the reporting date. If not, they are
satu tahun atau kurang setelah tanggal presented as non-current liabilities.
pelaporan. Jika tidak, utang usaha tersebut
disajikan sebagai liabilitas jangka panjang.
Utang usaha pada awalnya diakui sebesar Trade payables are recognised initially at fair
nilai wajar dan selanjutnya diukur pada biaya value and subsequently measured at
perolehan diamortisasi dengan menggunakan amortised cost using the effective interest
metode suku bunga efektif. method.
r. Sewa r. Leases
Grup sebagai pesewa The Group as a lessor
Ketika Grup bertindak sebagai pesewa, Grup When the Group acts as a lessor, it will classify
akan mengklasifikasi masing-masing sewanya each of its leases as either an operating lease
baik sewa operasi atau sewa pembiayaan. or a finance lease.
Untuk mengklasifikasi masing-masing sewa, To classify each lease, the Group makes an
Grup membuat penilaian secara keseluruhan overall assessment of whether the lease
atas apakah sewa mengalihkan secara transfers substantially all of the risks and
substansial seluruh risiko dan manfaat yang rewards incidental to ownership of the
terkait dengan kepemilikan aset pendasar. underlying asset. If this is the case, then the
Jika penilaian membuktikan hal tersebut, lease is classified as a finance lease; if not,
maka sewa diklasifikasikan sebagai sewa then it is an operating lease. Lease income
pembiayaan; jika tidak, maka merupakan from operating lease where the Group acts as
sewa operasi. Pendapatan sewa guna usaha a lessor is recognised as an income on a
dari sewa operasi dimana Grup bertindak straight-line basis over the lease term.
sebagai pesewa diakui sebagai pendapatan
secara garis lurus selama masa sewa.
Grup sebagai penyewa The Group as a lessee
Pada permulaan kontrak, Grup menilai At the inception of a contract, the Group
apakah kontrak merupakan, atau assesses whether the contract is, or contains,
mengandung, sewa. Suatu kontrak a lease. A contract is or contains a lease if the
merupakan atau mengandung sewa jika contract conveys the right to control the use of
kontrak tersebut memberikan hak untuk an identified asset for a period of time in
mengendalikan penggunaan aset exchange for a consideration.
identifikasian selama suatu jangka waktu
untuk dipertukarkan dengan imbalan.
Page 61
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/40 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
r. Sewa (lanjutan) r. Leases (continued)
Grup sebagai penyewa (lanjutan) The Group as a lessee (continued)
Untuk menilai apakah kontrak memberikan To assess whether a contract conveys the
hak untuk mengendalikan penggunaan aset right to control the use of an identified asset,
identifikasian, Grup akan menilai apakah: the Group will assess whether:
- Grup memiliki hak untuk mendapatkan - The Group has the right to obtain
secara substansial seluruh manfaat substantially all the economic benefits
ekonomis dari penggunaan aset from the use of the asset throughout the
identifikasian; dan period of use; and
- Grup memiliki hak untuk mengarahkan - The Group has the right to direct the use
penggunaan aset identifikasian. of the asset.
Pada tanggal permulaan sewa, Grup At the commencement date of the lease, the
mengakui aset hak-guna dan liabilitas sewa. Group recognises a right-of-use asset and a
Aset hak-guna pada saat di awal, diukur pada lease liability. The right-of-use asset is initially
biaya perolehan, dimana meliputi: measured at cost, which comprises:
- jumlah pengukuran awal liabilitas sewa; - the initial amount of the lease liability;
- pembayaran sewa yang dilakukan pada - lease payments made at or before the
atau sebelum tanggal permulaan, commencement date, less any lease
dikurangi dengan insentif sewa; incentive;
- biaya langsung awal yang dikeluarkan; - initial direct costs incurred; and
dan
- estimasi biaya yang akan dikeluarkan - an estimate of costs to dismantle and
untuk membongkar dan memindahkan remove the underlying asset to the
aset pendasar atau untuk merestorasi condition required by the terms and
aset pendasar ke kondisi yang conditions of the lease.
disyaratkan oleh syarat dan ketentuan
sewa.
Untuk kontrak yang mengandung komponen For a contract that contains a lease
sewa dan tambahan satu atau lebih komponen component and one or more additional lease
sewa atau nonsewa, Grup mengalokasikan or non-lease components, the Group allocates
imbalan dalam kontrak ke masing-masing the consideration in the contract to each lease
komponen sewa dan nonsewa berdasarkan and non-lease component on the basis of their
harga tersendiri relatif dari komponen sewa relative standalone price of the lease
dan harga tersendiri agregat dari komponen components and the aggregate standalone
nonsewa. price of the non-lease components.
Persyaratan sewa dinegosiasikan secara Lease terms are negotiated on individual
individual dan berisi berbagai persyaratan dan bases and contain a wide range of different
ketentuan yang berbeda. Perjanjian sewa terms and conditions. The lease agreements
tidak memberlakukan perjanjian apapun do not impose any covenants other than the
selain jaminan atas aset. security over the assets.
Page 62
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/41 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
r. Sewa (lanjutan) r. Leases (continued)
Grup sebagai penyewa (lanjutan) The Group as a lessee (continued)
Aset dan liabilitas yang timbul dari perjanjian Assets and liabilities arising from lease
sewa pada awalnya diukur pada nilai kini arrangements are initially measured at the
pembayaran sewa yang belum dibayar pada present value of the lease payments that are
tanggal permulaan, didiskontokan dengan not paid at the commencement date,
menggunakan suku bunga implisit dalam discounted using the interest rate implicit in the
sewa atau, jika suku bunga tersebut tidak lease or, if that rate cannot be readily
dapat ditentukan, maka menggunakan suku determined, using the incremental borrowing
bunga pinjaman inkremental. Pada umumnya, rate. Generally, the Group uses its incremental
Grup menggunakan suku bunga pinjaman borrowing rate as the discount rate.
inkremental sebagai tingkat bunga diskonto.
Pembayaran sewa yang termasuk dalam Lease payments included in the measurement
pengukuran liabilitas sewa meliputi of the lease liability comprise the following:
pembayaran berikut ini:
- pembayaran tetap, termasuk - fixed payments, including in-substance
pembayaran tetap secara substansi fixed payments less any lease incentive
dikurangi dengan piutang insentif sewa; receivable;
- pembayaran sewa variabel yang - variable lease payments that depend on
bergantung pada indeks atau suku bunga an index or a rate, initially measured using
yang pada awalnya diukur dengan the index or rate as at the commencement
menggunakan indeks atau suku bunga date;
pada tanggal permulaan;
- jumlah yang diperkirakan akan - amounts expected to be payable under a
dibayarkan oleh penyewa dengan residual value guarantee;
jaminan nilai residual;
- harga eksekusi opsi beli jika Grup cukup - the exercise price under a purchase
pasti untuk mengeksekusi opsi tersebut; option that the Group is reasonably
dan certain to exercise; and
- pembayaran penalti karena penghentian - penalty payments for early termination of
awal sewa kecuali jika Grup cukup pasti a lease unless the Group is reasonably
untuk tidak menghentikan lebih awal. certain not to terminate early.
Pembayaran sewa dialokasikan menjadi Each lease payment is allocated between the
bagian pokok dan biaya keuangan. Biaya liability and finance cost. The finance cost is
keuangan dibebankan pada laba rugi selama charged to profit or loss over the lease period
periode sewa sehingga menghasilkan tingkat so as to produce a constant periodic rate of
suku bunga periodik yang konstan atas saldo interest on the remaining balance of the
liabilitas untuk setiap periode. liability for each period.
Grup menyajikan aset hak-guna sebagai The Group presents right-of-use assets as part
bagian dari “Aset tetap” di dalam laporan of “Fixed assets” in the consolidated
posisi keuangan konsolidasian. Aset hak-guna statements of financial position. Right-of-use
juga diuji penurunan nilainya dengan assets are also tested for impairment in
mengacu pada kebijakan akuntansi pada accordance with the policy described in
Catatan 2m. Note 2m.
Page 63
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/42 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
r. Sewa (lanjutan) r. Leases (continued)
Grup sebagai penyewa (lanjutan) The Group as a lessee (continued)
Aset hak-guna umumnya disusutkan Right-of-use assets are generally depreciated
sepanjang waktu yang lebih pendek antara over the shorter of the asset’s useful life and
lama masa manfaat aset dan jangka waktu the lease term on a straight-line basis. If the
sewa menggunakan metode garis lurus. Jika Group is reasonably certain to exercise a
Grup cukup yakin untuk melaksanakan opsi purchase option, the right-of-use asset is
pembelian, aset hak-guna disusutkan selama depreciated over the underlying asset’s useful
masa manfaat aset yang mendasarinya. life.
Sewa jangka pendek dan sewa yang aset Short-term leases and low-value asset leases
pendasarnya bernilai rendah
Grup memutuskan untuk tidak mengakui aset The Group has elected not to recognise right-
hak-guna dan liabilitas sewa untuk sewa of-use assets and lease liabilities for short-
jangka pendek yang memiliki masa sewa 12 term leases that have a lease term of 12
bulan atau kurang dan sewa yang aset months or less and leases of low-value assets.
pendasarnya bernilai rendah. Grup mengakui The Group recognises the lease payments
pembayaran sewa atas sewa tersebut sebagai associated with these leases as an expense
beban dengan dasar garis lurus selama masa on a straight-line basis over the lease term.
sewa.
Modifikasi sewa Lease modification
Grup mencatat modifikasi sewa sebagai sewa The Group accounts for a lease modification
terpisah jika: as a separate lease if:
- modifikasi meningkatkan ruang lingkup - the modification increases the scope of
sewa dengan menambahkan hak untuk the lease by adding the right to use one or
menggunakan satu aset pendasar atau more underlying assets; and
lebih; dan
- imbalan sewa meningkat sebesar jumlah - the consideration for the lease increases
yang setara dengan harga tersendiri by an amount commensurate with the
untuk peningkatan dalam ruang lingkup standalone price for the increase in scope
dan penyesuaian yang tepat pada harga and any appropriate adjustments to that
tersendiri tersebut untuk merefleksikan standalone price to reflect the
kondisi kontrak tertentu. circumstances of the particular contract.
Untuk modifikasi sewa yang tidak dicatat For a lease modification that is not accounted
sebagai sewa terpisah, pada tanggal efektif for as a separate lease, at the effective date of
modifikasi sewa, Grup: the lease modification, the Group:
- mengukur kembali dan mengalokasikan - remeasures and allocates the
imbalan kontrak modifikasian; consideration in the modified contract;
- menentukan masa sewa dari sewa - determines the lease term of the modified
modifikasian; lease;
- mengukur kembali liabilitas sewa dengan - remeasures the lease liability by
mendiskontokan pembayaran sewa discounting the revised lease payments
revisian menggunakan tingkat diskonto using a revised discount rate. At the
revisian. Pada tanggal efektif modifikasi, effective date of the modification, the
tingkat diskonto revisian ditentukan revised discount rate is determined as the
sebagai suku bunga pinjaman Group’s incremental borrowing rate for
inkremental Grup untuk sisa masa sewa; the remainder of the lease term;
- menurunkan jumlah tercatat aset hak- - decreases the carrying amount of the
guna untuk merefleksikan penghentian right-of-use asset to reflect the partial or
sebagian atau sepenuhnya sewa untuk full termination of the lease for lease
modifikasi sewa yang menurunkan ruang modifications that decrease the scope of
lingkup sewa. Grup mengakui dalam laba the lease. The Group recognises in profit
rugi setiap keuntungan atau kerugian or loss any gain or loss relating to the
yang terkait dengan penghentian partial or full termination of the lease; and
sebagian atau sepenuhnya sewa
tersebut; dan
- membuat penyesuaian terkait aset hak- - makes a corresponding adjustment to the
guna untuk seluruh modifikasi sewa right-of-use asset for all other lease
lainnya. modifications.
Page 64
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/43 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
s. Provisi s. Provisions
i. Provisi pembongkaran, rehabilitasi, i. Provision for decommissioning, mine
reklamasi dan penutupan tambang rehabilitation, reclamation and mine
closure
Reklamasi, rehabilitasi, dan biaya Reclamation, rehabilitation and
lingkungan yang berkaitan dengan environmental expenditure to be incurred
pemulihan atas area yang terganggu related to the remediation of disturbed
selama tahap produksi dibebankan pada areas during the production phase are
beban pokok pendapatan pada saat charged to the cost of revenue when an
kewajiban dari pemulihan atas area yang obligation arising from the disturbance
terganggu tersebut timbul selama occurs as extraction progresses.
penambangan.
Kewajiban ini diakui sebagai liabilitas These obligations are recognised as
pada saat timbulnya kewajiban hukum liabilities when a legal or constructive
atau konstruktif yang berasal dari aktivitas obligation has arisen from activities that
yang telah dilaksanakan. Kewajiban ini have already been performed. This
diukur pada saat dan setelah pengakuan obligation is initially and subsequently
sebesar nilai kini dari perkiraan measured at the present value of the
pengeluaran yang diperlukan untuk expenditure expected to be required to
menyelesaikan kewajiban dengan settle the obligation using a pre-tax rate,
menggunakan tingkat diskonto sebelum which reflects current market
pajak, yang mencerminkan penilaian assessments of the time value of money
pasar kini atas nilai waktu uang dan risiko and the risks specific to the obligation.
yang terkait dengan kewajiban tersebut. Changes in the measurement of a liability
Perubahan pada pengukuran kewajiban which arise during production are also
yang timbul selama tahap produksi juga charged to the cost of revenue, while the
dibebankan ke beban pokok pendapatan, increase in the provision due to the
sementara peningkatan kewajiban yang passage of time is recognised as finance
sehubungan dengan berlalunya waktu costs.
diakui sebagai biaya keuangan.
Provisi pembongkaran aset-aset tambang Provision for decommissioning of mining
dan kegiatan pascatambang terkait assets and related post-mining activities,
beserta peninggalan dan pembongkaran as well as the abandonment and
aset-aset berumur panjang dibentuk decommissioning of other long-lived
sehubungan dengan kewajiban hukum assets, is made for the legal obligations
berkaitan dengan penarikan aset associated with the retirement of mining
tambang terkait dan aset berumur related assets and other long-lived assets
panjang lainnya termasuk pembongkaran including the decommissioning of
bangunan, peralatan, fasilitas peremukan buildings, equipment, crushing and
dan pengolahan, infrastruktur, dan handling facilities, infrastructure and
fasilitas lainnya yang berasal dari other facilities that resulted from the
pembelian, konstruksi atau acquisition, construction or development
pengembangan aset tersebut. of such assets.
Kewajiban ini diakui sebagai liabilitas These obligations are recognised as
pada saat timbulnya kewajiban hukum liabilities when a legal or constructive
atau konstruktif yang berkaitan dengan obligation with respect to the retirement of
penarikan sebuah aset, dengan an asset is incurred, with initial and
pengukuran pada saat dan setelah subsequent measurement of the
pengakuan sebesar nilai kini dari obligation at the present value of the
perkiraan pengeluaran yang diperlukan expenditure expected to be required to
untuk menyelesaikan kewajiban dengan settle the obligation using a pre-tax rate
menggunakan tingkat diskonto sebelum that reflects current market assessments
pajak, yang mencerminkan penilaian of the time value of money and the risks
pasar kini atas nilai waktu uang dan risiko specific to the obligation.
yang terkait dengan kewajiban tersebut.
Page 65
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/44 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
s. Provisi (lanjutan) s. Provisions (continued)
i. Provisi pembongkaran, rehabilitasi, i. Provision for decommissioning, mine
reklamasi dan penutupan tambang rehabilitation, reclamation and mine
(lanjutan) closure (continued)
Biaya penarikan aset dalam jumlah yang An asset retirement cost equivalent to
setara dengan jumlah liabilitas tersebut these liabilities is capitalised as part of the
dikapitalisasi sebagai bagian dari suatu related asset’s carrying amount, and is
aset tertentu dan kemudian disusutkan subsequently depreciated or depleted
atau dideplesi selama masa manfaat aset over the asset’s useful life. The increase
tersebut. Peningkatan kewajiban in these obligations due to the passage of
sehubungan dengan berlalunya waktu time is recognised as part of finance
diakui dalam biaya keuangan. costs.
Perubahan dalam pengukuran kewajiban The changes in the measurement of
pembongkaran yang timbul dari decommissioning obligations that result
perubahan estimasi waktu atau jumlah from changes in the estimated timing or
pengeluaran sumber daya ekonomis amount of the outflow of resources
(contohnya: arus kas) yang diperlukan embodying economic benefits (e.g. cash
untuk menyelesaikan kewajiban tersebut, flow) required to settle the obligations, or
atau perubahan dalam tingkat diskonto, a change in the discount rate, will be
akan ditambahkan pada atau added to or deducted from the cost of the
dikurangkan dari, harga perolehan aset related asset in the current year. The
yang bersangkutan pada tahun berjalan. amount deducted from the cost of the
Jumlah yang dikurangkan dari harga asset should not exceed its carrying
perolehan aset tidak boleh melebihi amount. If a decrease in the liability
jumlah tercatatnya. Jika penurunan dalam exceeds the carrying amount of the asset,
liabilitas melebihi nilai tercatat aset, the excess is recognised immediately in
kelebihan tersebut segera diakui dalam profit or loss. If the adjustment results in
laba rugi. Jika penyesuaian tersebut an addition to the cost of an asset, the
menghasilkan penambahan pada harga Group will consider whether this is an
perolehan aset, Grup akan indication that the new carrying amount of
mempertimbangkan apakah hal ini the asset may not be fully recoverable. If
mengindikasikan bahwa nilai tercatat aset there is any such indication, the Group
yang baru mungkin tidak bisa dipulihkan will test the asset for impairment by
secara penuh. Jika terdapat indikasi estimating its recoverable amount and
tersebut, Grup akan melakukan pengujian will account for any impairment losses
penurunan nilai terhadap aset tersebut incurred.
dengan melakukan estimasi atas nilai
yang dapat dipulihkan dan akan
memperhitungkan setiap kerugian dari
penurunan nilai yang terjadi.
ii. Provisi lain-lain ii. Other provisions
Provisi untuk biaya restrukturisasi, Provisions for restructuring costs, legal
tuntutan hukum, atau hal-hal yang claims, or environmental issues that may
berkaitan dengan lingkungan yang tidak not involve the retirement of an asset,
berkaitan dengan penghentian aset, reclamation and closure of mining areas
reklamasi, dan penutupan area and others are recognised when:
pertambangan dan lainnya diakui ketika:
• Grup memiliki kewajiban hukum atau • the Group has a present legal or
konstruktif saat kini sebagai akibat constructive obligation as a result of
dari peristiwa masa lalu; past events;
• kemungkinan arus keluar sumber • it is probable that an outflow of
daya diperlukan untuk resources will be required to settle
menyelesaikan kewajiban tersebut; the obligation; and
dan
• jumlahnya dapat diestimasi secara • the amount can be reliably
andal. estimated.
Page 66
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/45 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
s. Provisi (lanjutan) s. Provisions (continued)
ii. Provisi lain-lain (lanjutan) ii. Other provisions (continued)
Jika terdapat sejumlah kewajiban serupa, Where there are a number of similar
maka kemungkinan arus keluar untuk obligations, the likelihood that an outflow
menyelesaikan kewajiban tersebut will be required in settlement is
ditentukan dengan mempertimbangkan determined by considering the class of
secara keseluruhan kelompok kewajiban. obligations as a whole. Although the
Walaupun kemungkinan arus keluar likelihood of an outflow in respect of any
sehubungan dengan setiap pos one item may be small, it is probable that
kewajiban tersebut kecil, terdapat some outflow of resources will be needed
kemungkinan besar dibutuhkan arus to settle the class of obligations as a
keluar sumber daya untuk menyelesaikan whole. If that is the case, a provision is
kelompok kewajiban secara keseluruhan. recognised.
Jika hal itu terjadi, maka provisi diakui.
Provisi diukur pada nilai kini dari estimasi The provision is measured at the present
terbaik manajemen atas pengeluaran value of management’s best estimate of
yang diperlukan untuk menyelesaikan the expenditure expected to be required
kewajiban dengan menggunakan tingkat to settle the present obligation using a
diskonto sebelum pajak, yang pre-tax rate that reflects current market
mencerminkan penilaian pasar kini atas assessments of the time value of money
nilai waktu uang dan risiko yang terkait and the risks specific to the liability. The
dengan liabilitas yang bersangkutan. increase in the provision due to the
Peningkatan provisi sehubungan dengan passage of time is recognised as part of
berlalunya waktu diakui sebagai bagian finance costs.
dari biaya keuangan.
t. Pinjaman t. Borrowings
Pinjaman diakui pada awalnya sebesar nilai Borrowings are recognised initially at their fair
wajar, dikurangi dengan biaya transaksi yang value, net of any transaction costs incurred.
terjadi. Pinjaman kemudian dicatat sebesar Borrowings are subsequently carried at
biaya perolehan diamortisasi, dengan selisih amortised cost, with any difference between
antara hasil perolehan (dikurangi dengan the proceeds (net of transaction costs) and the
biaya transaksi) dan nilai penarikan diakui redemption value recognised in profit or loss
dalam laba rugi selama periode pinjaman over the period of the borrowing, using the
dengan menggunakan metode suku bunga effective interest method.
efektif.
Biaya-biaya yang dibayar untuk mendapatkan Fees paid on the establishment of loan
fasilitas pinjaman diakui sebagai biaya facilities are recognised as transaction costs
transaksi pinjaman tersebut, apabila besar of the loan to the extent that it is probable that
kemungkinan akan dilakukan penarikan atas some or all of the facilities will be drawn down.
sebagian atau seluruh fasilitas tersebut. In this case, the fee is deferred until the
Dalam hal ini, biaya tersebut ditangguhkan drawdown occurs. To the extent that there is
sampai dilakukan penarikan. Apabila tidak no evidence that it is probable that some or all
terdapat bukti bahwa kemungkinan besar of the facility will be drawn down, the fee is
akan dilakukan penarikan atas sebagian atau capitalised as a prepayment for financing
seluruh fasilitas tersebut, biaya tersebut costs and amortised over the period of the
dikapitalisasi sebagai biaya dibayar dimuka facility to which it relates. Borrowings are
untuk biaya keuangan dan diamortisasi classified as current liabilities unless the
selama periode fasilitas terkait. Pinjaman Group has a right at the end of the reporting
diklasifikasikan sebagai liabilitas jangka period to defer the settlement of the liability for
pendek kecuali Grup memiliki hak pada akhir at least 12 months from the reporting date.
periode pelaporan untuk menunda
pembayaran liabilitas selama paling tidak 12
bulan dari tanggal pelaporan.
Page 67
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/46 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
t. Pinjaman (lanjutan) t. Borrowings (continued)
Kovenan yang harus dipatuhi oleh Grup, pada Covenants that the Group is required to
atau sebelum akhir periode pelaporan, comply with, on or before the end of the
dipertimbangkan dalam mengklasifikasikan reporting period, are considered in classifying
perjanjian pinjaman dengan perjanjian loan arrangements with covenants as current
sebagai lancar atau tidak lancar. Kovenan or non-current. Covenants that the Group is
yang harus dipatuhi oleh Grup setelah periode required to comply with after the reporting
pelaporan tidak memengaruhi klasifikasi pada period do not affect the classification at the
tanggal pelaporan. reporting date.
u. Biaya pinjaman u. Borrowing costs
Biaya pinjaman baik yang secara langsung Borrowing costs either directly or indirectly
ataupun tidak langsung dapat diatribusikan attributable to the acquisition, construction or
dengan akuisisi, konstruksi atau produksi aset production of a qualifying asset are capitalised
kualifikasian, dikapitalisasi sebagai bagian as part of the cost of that asset until such time
biaya perolehan aset tersebut sampai aset as the asset is substantially ready for its
tersebut siap untuk digunakan sesuai dengan intended use or sale. For borrowings directly
maksudnya atau dijual. Untuk pinjaman yang attributable to a qualifying asset, the amount
dapat diatribusi secara langsung pada suatu to be capitalised is determined as the actual
aset kualifikasian, jumlah yang dikapitalisasi borrowing costs incurred during the period,
adalah sebesar biaya pinjaman yang terjadi less any income earned on the temporary
selama periode berjalan, dikurangi investment of such borrowings. For
pendapatan investasi lain-lain dari pinjaman borrowings that are not directly attributable to
tersebut. Untuk pinjaman yang tidak dapat a qualifying asset, the amount to be
diatribusi secara langsung pada suatu aset capitalised is determined by applying a
kualifikasian, jumlah biaya pinjaman yang capitalisation rate to the amount spent on the
dikapitalisasi ditentukan dengan mengalikan qualifying asset. An entity shall cease
tingkat kapitalisasi dengan pengeluaran untuk capitalising borrowing costs when
aset kualifikasian. Entitas menghentikan substantially all of the activities necessary to
kapitalisasi biaya pinjaman ketika secara prepare the qualifying assets are complete.
substansial seluruh aktivitas yang diperlukan
untuk mempersiapkan aset kualifikasian telah
selesai.
Semua biaya pinjaman lainnya diakui dalam All other borrowing costs are recognised in
laba rugi pada periode dimana biaya-biaya profit or loss in the period in which they are
tersebut terjadi. incurred.
v. Imbalan kerja karyawan v. Employee benefits
i. Imbalan pasca kerja i. Post-employment benefits
Skema pensiun diklasifikasikan sebagai Pension schemes are classified as either
program iuran pasti atau program imbalan defined contribution plans or defined
pasti, tergantung pada substansi ekonomi benefit plans, depending on the
dari syarat dan kondisi utama program economic substance of the plan as
tersebut. derived from its principal terms and
conditions.
Program iuran pasti adalah program A defined contribution plan is a pension
pensiun yang mewajibkan Grup plan under which the Group pays fixed
membayar sejumlah iuran tertentu contributions into a separate entity. The
kepada entitas terpisah. Grup tidak Group has no legal or constructive
memiliki kewajiban hukum atau obligations to pay further contributions if
konstruktif untuk membayar iuran lebih the fund does not hold sufficient assets to
lanjut jika entitas tersebut tidak memiliki pay all employees the benefits relating to
aset yang cukup untuk membayar seluruh employee service in the current and prior
imbalan atas jasa yang diberikan pekerja years.
pada tahun berjalan dan tahun-tahun
sebelumnya.
Page 68
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/47 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
v. Imbalan kerja karyawan (lanjutan) v. Employee benefits (continued)
i. Imbalan pasca kerja (lanjutan) i. Post-employment benefits (continued)
Program imbalan pasti adalah program A defined benefit plan is a pension plan
pensiun yang bukan merupakan program that is not a defined contribution plan.
iuran pasti. Program imbalan pasti adalah Typically, defined benefit plans define an
program pensiun yang menentukan amount of pension benefit that an
jumlah imbalan pensiun yang akan employee will receive upon retirement,
diterima seorang pekerja pada saat usually dependent on one or more factors
pensiun, biasanya berdasarkan pada satu such as age, years of service and
atau lebih faktor seperti usia, masa kerja, compensation.
dan kompensasi.
Grup harus mencadangkan jumlah The Group is required to allocate a
minimal imbalan pensiun sesuai dengan provision for a minimum amount of
peraturan ketenagakerjaan pada hukum pension benefit in accordance with the
yang berlaku di Indonesia (“Peraturan manpower regulations on the applicable
Ketenagakerjaan”) atau Perjanjian Kerja law in Indonesia (“Manpower
Bersama (“PKB”) atau Peraturan Regulations”) or the Group’s Collective
Perusahaan (“PP”), mana yang lebih Labour Agreement (the “CLA”) or
tinggi. Oleh karena Peraturan Company Regulation (“CR”), whichever
Ketenagakerjaan atau PKB atau PP is higher. Since the Manpower
menetapkan formula untuk menghitung Regulations or the CLA or the CR sets the
jumlah minimal imbalan pensiun, maka formula for determining the minimum
pada dasarnya, program pensiun amount of benefits, in substance pension
berdasarkan Peraturan Ketenagakerjaan plans under the Manpower Regulations
atau PKB atau PP adalah program or the CLA or the CR represent defined
imbalan pasti. benefit plans.
Sehubungan dengan program imbalan The liability recognised in the
pasti, liabilitas diakui pada laporan posisi consolidated statements of financial
keuangan konsolidasian setara dengan position in respect of defined benefit
nilai kini kewajiban imbalan pasti pada pension plans is equivalent to the present
akhir tahun pelaporan dikurangi nilai value of the defined benefit obligation at
wajar aset program. Kewajiban imbalan the end of the reporting year less the fair
pasti dihitung setiap tahun oleh aktuaris value of plan assets. The defined benefit
independen dengan menggunakan obligation is calculated annually by
metode Projected Unit Credit. independent actuaries using the
Projected Unit Credit method.
Nilai kini kewajiban imbalan pasti The present value of the defined benefit
ditentukan dengan mendiskontokan arus obligation is determined by discounting
kas keluar yang diestimasi dengan the estimated future cash outflows using
menggunakan tingkat bunga obligasi the interest rates of high-quality corporate
korporat berkualitas tinggi dalam bonds that are denominated in the
denominasi mata uang dimana imbalan currency in which the benefits will be
akan dibayarkan dan memiliki jangka paid, and that have terms of maturity
waktu jatuh tempo mendekati jangka approximating the terms of the related
waktu kewajiban pensiun. Apabila tidak pension obligations. When there is no
terdapat pasar aktif untuk obligasi deep market for such bonds, the market
korporat tersebut, digunakan bunga rates of government bonds are used.
obligasi pemerintah.
Biaya jasa lalu diakui segera dalam laba Past service costs are recognised
rugi. Keuntungan dan kerugian atas immediately in profit or loss. Gains or
kurtailmen atau penyelesaian suatu losses on the curtailment or settlement of
program imbalan pasti diakui pada saat a defined benefit plan are recognised
kurtailmen atau penyelesaian tersebut when the curtailment or settlement
terjadi. occurs.
Page 69
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/48 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
v. Imbalan kerja karyawan (lanjutan) v. Employee benefits (continued)
i. Imbalan pasca kerja (lanjutan) i. Post-employment benefits (continued)
Pengukuran kembali yang timbul dari Remeasurements arising from
penyesuaian pengalaman dan perubahan experience adjustments and changes in
asumsi-asumsi aktuarial dibebankan atau actuarial assumptions are charged or
dikreditkan pada ekuitas dalam laporan credited to equity in the statement of
penghasilan komprehensif lain pada other comprehensive income in the
periode dimana beban tersebut terjadi. period in which they arise. The
Akumulasi saldo pengukuran kembali accumulated remeasurements balance is
dilaporkan di saldo laba. reported in retained earnings.
Untuk program iuran pasti, Grup For defined contribution plans, the Group
membayar iuran untuk program jaminan pays contributions for old age protection
hari tua dan jaminan pensiun yang and pension protection to the Government
dikelola oleh Pemerintah, dengan dasar administered pension insurance plans on
kewajiban. Grup tidak memiliki kewajiban a mandatory basis. The Group has no
membayar lebih lanjut jika iuran tersebut further payment obligations once the
telah dibayarkan. Iuran tersebut diakui contributions have been paid. The
sebagai beban imbalan kerja ketika jatuh contributions are recognised as employee
tempo. Iuran dibayar dimuka diakui benefit expenses when they become due.
sebagai aset sepanjang pengembalian Prepaid contributions are recognised as
dana atau pengurangan pembayaran an asset to the extent that a cash refund
masa depan dimungkinkan. or reduction in future payments is
available.
ii. Pesangon pemutusan kontrak kerja ii. Termination benefits
Pesangon pemutusan kontrak kerja Termination benefits are payable when
dibayarkan ketika pekerja diberhentikan, employment is terminated by the Group
atau ketika pekerja menerima tawaran or when the employee accepts a
imbalan dari entitas atas terminasi compensation offer from the entity for
kontrak kerja. Grup mengakui pesangon terminating the employment contract.
pemutusan kontrak kerja pada tanggal The Group recognises termination
yang lebih dahulu dari: (i) ketika Grup benefits at the earlier of the following
tidak bisa lagi membatalkan penawaran dates: (i) when the Group can no longer
pesangon; dan (ii) ketika Grup mengakui withdraw the offer of those benefits; and
biaya untuk restrukturisasi yang berada (ii) when the Group recognises costs for
dalam lingkup PSAK No. 237, “Provisi, a restructuring that is within the scope of
Liabilitas Kontinjensi dan Aset SFAS No. 237, “Provisions, Contingent
Kontinjensi” dan melibatkan pembayaran Liabilities and Contingent Assets” and
pesangon pemutusan kontrak kerja. involves the payment of termination
Dalam hal pekerja menerima tawaran benefits. In the case the employee
imbalan dari entitas atas terminasi accepts an offer of compensation from
kontrak kerja, pesangon pemutusan the entity upon termination of the
kontrak kerja diukur berdasarkan employment contract, the termination
ekspektasi jumlah karyawan yang benefits are measured based on the
menerima penawaran tersebut. number of employees expected to accept
Pesangon pemutusan kontrak kerja yang the offer. Benefits falling due more than
jatuh tempo lebih dari 12 bulan setelah 12 months after the reporting date are
tanggal pelaporan didiskontokan ke nilai discounted to their present value.
kini.
Page 70
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/49 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
w. Modal saham w. Share capital
Saham biasa dikelompokkan sebagai ekuitas, Ordinary shares are classified as equity, and
dan biaya langsung yang berkaitan dengan incremental costs directly attributable to the
penerbitan saham baru atau opsi disajikan issuance of new shares or options are shown
sebagai pengurang ekuitas, setelah dikurangi in equity as a deduction, net of tax, from the
pajak, dari jumlah yang diterima. proceeds.
x. Saham treasuri x. Treasury shares
Ketika Perusahaan membeli modal saham When the Company purchases the
ekuitas Perusahaan (saham treasuri), imbalan Company’s equity share capital (treasury
yang dibayar, termasuk biaya tambahan yang shares), the consideration paid, including any
secara langsung dapat diatribusikan directly attributable incremental costs (net of
(dikurangi pajak penghasilan) dikurangkan income taxes) is deducted from equity
dari ekuitas yang diatribusikan kepada pemilik attributable to the Company’s equity holders
ekuitas Perusahaan sampai saham tersebut until the shares are cancelled or reissued.
dibatalkan atau diterbitkan kembali. Ketika Where such ordinary shares are subsequently
saham biasa tersebut selanjutnya diterbitkan reissued, any consideration received, net of
kembali, imbalan yang diterima, dikurangi any directly attributable incremental
biaya tambahan transaksi yang terkait dan transaction costs and the related income tax
dampak pajak penghasilan yang terkait effects, is included in equity attributable to the
dimasukkan pada ekuitas yang dapat Company’s equity holders.
diatribusikan kepada pemilik ekuitas
Perusahaan.
y. Laba per saham y. Earnings per share
Laba per saham dasar dihitung dengan Basic earnings per share is calculated by
membagi laba periode berjalan yang dividing the profit for the period attributable to
diatribusikan kepada pemegang saham the equity holders of the Company by the
Perusahaan dengan jumlah rata-rata weighted-average number of ordinary shares
tertimbang saham biasa yang beredar pada outstanding during the period.
periode berjalan.
Laba per saham dilusian dihitung dengan Diluted earnings per share is calculated by
membagi laba periode berjalan yang dividing profit for the period attributable to the
diatribusikan kepada pemegang modal equity holders of the Company adjusted for
Perusahaan yang telah disesuaikan dengan finance costs and foreign exchange gains or
biaya keuangan dan keuntungan atau losses on convertible bonds and their related
kerugian selisih kurs atas utang obligasi tax effects, by the weighted-average number
konversi, serta pengaruh pajak yang of issued and fully paid-up shares during the
bersangkutan, dengan jumlah tertimbang period, assuming that all options have been
saham yang ditempatkan dan disetor penuh exercised and all convertible bonds have been
selama periode yang bersangkutan, converted.
berdasarkan asumsi bahwa semua opsi telah
dilaksanakan dan seluruh utang obligasi
konversi telah dikonversikan.
z. Pembagian dividen z. Dividend distributions
Pembagian dividen kepada pemegang saham Dividend distributions to the Company’s
Perusahaan diakui sebagai liabilitas dalam shareholders are recognised as liabilities in
laporan keuangan konsolidasian dalam the consolidated financial statements in the
periode ketika pembagian dividen telah period when the dividends are declared.
diumumkan.
Page 71
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/50 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
aa. Kombinasi bisnis entitas sepengendali aa. Business combinations of entities under
common control
Kombinasi bisnis entitas sepengendali Business combinations of entities under
dibukukan menggunakan metode penyatuan common control are accounted for using the
kepemilikan (pooling-of-interests). pooling-of-interests method.
Selisih antara harga konsiderasi yang diterima The difference between the consideration
dengan nilai tercatat setiap transaksi received and the carrying amount of each
restrukturisasi antara entitas sepengendali restructuring transaction among entities under
dibukukan sebagai bagian tambahan modal common control is recorded as part of
disetor dalam bagian ekuitas di laporan posisi additional paid-in capital in the equity section
keuangan konsolidasian. of the consolidated statements of financial
position.
ab. Pengakuan pendapatan dan beban ab. Revenue and expense recognition
Pendapatan dari kontrak dengan pelanggan Revenue from contracts with customers
Pengakuan pendapatan harus memenuhi lima Revenue recognition has to fulfil five steps of
langkah analisa sebagai berikut: assessment:
1. Identifikasi kontrak dengan pelanggan. 1. Identify contract(s) with a customer.
2. Identifikasi kewajiban pelaksanaan dalam 2. Identify the performance obligations in the
kontrak. Kewajiban pelaksanaan contract. Performance obligations are
merupakan janji-janji dalam kontrak untuk promises in a contract to transfer to a
menyerahkan barang atau jasa yang customer goods or services that are
memiliki karakteristik berbeda ke distinct.
pelanggan.
3. Penetapan harga transaksi. Harga 3. Determine the transaction price. The
transaksi merupakan jumlah imbalan transaction price is the amount of
yang berhak diperoleh suatu entitas consideration to which an entity expects
sebagai kompensasi atas diserahkannya to be entitled in exchange for transferring
barang atau jasa yang dijanjikan ke promised goods or services to a
pelanggan. Jika imbalan yang dijanjikan customer. If the consideration promised in
di kontrak mengandung suatu jumlah a contract includes a variable amount, the
yang bersifat variabel, maka Grup Group estimates the amount of
membuat estimasi jumlah imbalan consideration to which it expects to be
tersebut sebesar jumlah yang diharapkan entitled in exchange for transferring the
berhak diterima atas diserahkannya promised goods or services to a customer
barang atau jasa yang dijanjikan ke less the estimated amount of service level
pelanggan dikurangi dengan estimasi guarantee that will be paid during the
jumlah jaminan kinerja jasa yang akan contract period.
dibayarkan selama periode kontrak.
4. Alokasi harga transaksi ke setiap 4. Allocate the transaction price to each
kewajiban pelaksanaan dengan performance obligation on the basis of the
menggunakan dasar harga jual berdiri relative stand-alone selling prices of each
sendiri relatif dari setiap barang atau jasa distinct item of goods or services
berbeda yang dijanjikan di kontrak. Ketika promised in the contract. Where these are
tidak dapat diamati secara langsung, not directly observable, the relative stand-
harga jual berdiri sendiri relatif alone selling prices are estimated based
diperkirakan berdasarkan biaya yang on expected cost plus margin.
diharapkan ditambah marjin.
5. Pengakuan pendapatan ketika kewajiban 5. Recognise revenue when the
pelaksanaan telah dipenuhi dengan performance obligation is satisfied by
menyerahkan barang atau jasa yang transferring the promised goods or
dijanjikan ke pelanggan (ketika services to a customer (which is when the
pelanggan telah memiliki kendali atas customer obtains control of those goods
barang atau jasa tersebut). or services).
Page 72
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/51 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
ab. Pengakuan pendapatan dan beban ab. Revenue and expense recognition
(lanjutan) (continued)
Pendapatan dari kontrak dengan pelanggan Revenue from contracts with customers
(lanjutan) (continued)
Pendapatan dari penjualan barang diakui Revenue from sales of goods is recognised
ketika pengendalian dialihkan kepada when control transfers to the customer. There
pelanggan. Terdapat kondisi di mana may be circumstances when judgement is
pertimbangan diperlukan berdasarkan lima required based on the five indicators of control
indikator pengendalian di bawah ini: below:
1. Pelanggan telah memiliki risiko dan 1. The customer has the significant risks and
manfaat signifikan atas kepemilikan aset rewards of ownership and has the ability
dan memperoleh kemampuan untuk to direct the use of, and obtain
mengarahkan penggunaan atas, dan substantially all of the remaining benefits
memperoleh secara substansial seluruh from, the goods.
sisa manfaat dari barang.
2. Pelanggan memiliki kewajiban kini untuk 2. The customer has a present obligation to
membayar sesuai dengan syarat dan pay in accordance with the terms of the
ketentuan dalam kontrak penjualan. sales contract.
3. Pelanggan telah menerima barang. 3. The customer has accepted the goods.
Penjualan barang dapat tergantung pada Sales revenue may be subject to
penyesuaian berdasarkan inspeksi adjustment based on the inspection of
terhadap pengiriman oleh pelanggan. shipments by the customer. In these
Dalam hal ini, penjualan diakui cases, sales are recognised based on the
berdasarkan estimasi terbaik Grup Group’s best estimate of the grade and/or
terhadap kualitas dan/atau kuantitas saat quantity at the time of shipment, and any
pengiriman, dan penyesuaian kemudian subsequent adjustments are recorded
dicatat dalam akun pendapatan. Secara against revenue. Historically, the
historis, perbedaan antara kualitas dan differences between estimated and actual
kuantitas, estimasi dan/atau aktual tidak grade and/or quantity have not been
signifikan. significant.
4. Pelanggan telah memiliki hak kepemilikan 4. The customer has the legal title to the
legal atas barang. goods.
5. Pelanggan telah menerima kepemilikan 5. The customer has physical possession of
fisik atas barang. the goods.
Kewajiban pelaksanaan dapat dipenuhi A performance obligation may be satisfied at
dengan cara sebagai berikut: the following:
a. Pada waktu tertentu (umumnya janji a. Point in time (typically for promises to
untuk menyerahkan barang ke transfer goods to a customer); or
pelanggan); atau
b. Sepanjang waktu (umumnya janji untuk b. Over time (typically for promises to
menyerahkan jasa ke pelanggan). Untuk transfer services to a customer). For a
kewajiban pelaksanaan yang dipenuhi performance obligation satisfied over
dalam suatu periode waktu, Grup memilih time, the Group selects an appropriate
ukuran penyelesaian yang sesuai untuk measure of progress to determine the
penentuan jumlah pendapatan yang amount of revenue that should be
harus diakui karena telah terpenuhinya recognised as the performance obligation
kewajiban pelaksanaan. is satisfied.
Page 73
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/52 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
ab. Pengakuan pendapatan dan beban ab. Revenue and expense recognition
(lanjutan) (continued)
Pendapatan dari kontrak dengan pelanggan Revenue from contracts with customers
(lanjutan) (continued)
Aset kontrak adalah hak imbalan Grup dalam A contract asset is an entity’s right to
pertukaran barang atau jasa yang dialihkan consideration in exchange for goods or
Grup kepada pelanggan. Liabilitas kontrak services that the entity has transferred to a
adalah kewajiban Grup untuk mengalihkan customer. A contract liability is an entity’s
barang atau jasa kepada pelanggan di mana obligation to transfer goods or services to a
Grup telah menerima imbalan (atau jumlah customer for which the entity has received
imbalan yang jatuh tempo) dari pelanggan consideration (or an amount of consideration
tersebut. is due) from the customer.
i. Penjualan batubara i. Sales of coal
Pendapatan penjualan diakui pada setiap Sales revenue is recognised on each
penjualan individu ketika pengendalian individual sale when control transfers to
beralih kepada pelanggan. Pengendalian the customer. Control passes to the
beralih ke pelanggan dan pendapatan customer and sales revenue is
penjualan diakui ketika produk dimuat ke recognised when the product is loaded
kapal di mana batubara akan dikirim ke onto the vessel on which the coal will be
pelabuhan tujuan atau tempat pelanggan. shipped to the destination port or the
customer’s premises.
Grup secara umum menjual batubara The Group generally sells its coal
dengan syarat Free on Board (“FOB”), di products on Free on Board (“FOB”) terms,
mana Grup tidak memiliki tanggung jawab where the Group has no responsibility for
untuk pengangkutan atau asuransi freight or insurance once control of the
setelah pengendalian barang telah goods has passed at the loading port.
berlalu di pelabuhan muat. Untuk jangka Under these terms, there is only one
waktu ini hanya ada satu kewajiban performance obligation, for the provision
pelaksanaan, yaitu untuk penyediaan of product at the point where control
produk pada titik di mana pengendalian passes. In addition, the Group also sells
lewat. Selain itu juga, Grup menjual coal on Cost, Insurance and Freight
batubara dengan syarat Cost, Insurance (“CIF”) terms, but under the sales
and Freight (“CIF”), tetapi berdasarkan agreement, the title and risk of loss of coal
perjanjian penjualan, kepemilikan dan shall remain with the Group until the coal
risiko kerugian atas batubara akan tetap passes the discharging port. Under this
berada pada Grup sampai batubara condition, the Group considers that the
melewati pelabuhan bongkar. Dalam insurance and freight costs are not
kondisi ini, Grup menganggap bahwa separate performance obligations but one
biaya asuransi dan pengangkutan bukan performance obligation with the sale of
merupakan kewajiban pengendalian coal as the control over the coal only
terpisah melainkan satu kewajiban passes to the buyer when the coal has
pelaksanaan dengan penjualan batubara arrived at the buyer’s location.
dikarenakan pengendalian atas batubara Accordingly, the Group does not have any
berpindah ke pembeli pada saat batubara separate performance obligations for the
tersebut sudah sampai di lokasi pembeli. transportation and insurance services
Oleh karena itu Grup tidak memiliki provided.
kewajiban pelaksanaan terpisah untuk
jasa pengangkutan dan asuransi yang
disediakan.
Page 74
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/53 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
ab. Pengakuan pendapatan dan beban ab. Revenue and expense recognition
(lanjutan) (continued)
Pendapatan dari kontrak dengan pelanggan Revenue from contracts with customers
(lanjutan) (continued)
ii. Pendapatan jasa logistik, termasuk jasa ii. Rendering of logistics services, including
sewa dan jasa lainnya rental and other services
Grup mengakui pendapatan atas The Group recognises revenue for a
terpenuhinya kewajiban pelaksanaan performance obligation satisfied over
dalam suatu periode hanya jika Grup time only if the Group can reasonably
dapat mengukur dengan andal atas measure its progress towards complete
penyelesaian kewajiban pelaksanaan. satisfaction of the performance
Dalam keadaan tertentu, Grup mungkin obligation. In some circumstances, the
tidak dapat mengukur hasil atas Group may not be able to reasonably
kewajiban pelaksanaan secara wajar, measure the outcome of a performance
tetapi Grup berekspektasi untuk obligation, but the Group expects to
memulihkan biaya yang timbul dalam recover the costs incurred in satisfying
memenuhi kewajiban pelaksanaan. the performance obligation. In those
Dalam keadaan tersebut, Grup mengakui circumstances, the Group recognises
pendapatan hanya sebatas biaya yang revenue only to the extent of the costs
timbul sampai Grup dapat mengukur hasil incurred until such time that it can
kewajiban pelaksanaan secara wajar. reasonably measure the outcome of the
performance obligation.
Pendapatan dari jasa logistik, termasuk Revenue from logistics services,
jawa sewa dan jasa lainnya, diakui atas including rental and other services, is
dasar pekerjaan yang diselesaikan dalam recognised on the basis of the work
suatu waktu pada saat jasa tersebut completed over time as the services are
diberikan kepada pelanggan. delivered to the customer.
iii. Perjanjian konsesi jasa iii. Service concession arrangements
Pendapatan keuangan dari perjanjian Finance income from service concession
konsesi jasa merupakan pendapatan arrangements represents the interest
bunga dari piutang jasa konsesi yang income on the service concession
timbul dari pengaturan jasa konsesi dan receivable arising from a service
diakui dengan menggunakan metode concession arrangement and is
suku bunga efektif. recognised using the effective interest
method.
Page 75
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/54 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
ab. Pengakuan pendapatan dan beban ab. Revenue and expense recognition
(lanjutan) (continued)
Beban Expenses
i. Beban dari kontrak dengan pelanggan i. Expenses from contracts with customers
Biaya yang secara langsung The costs that directly relate to the
berhubungan dengan kontrak, contract generate resources to satisfy the
menghasilkan sumber daya untuk contract (“cost to fulfil”) or are incremental
memenuhi kontrak (“biaya untuk to obtaining a contract (“cost to obtain”)
memenuhi”) atau penambahan untuk and are expected to be recovered. These
mendapatkan kontrak (“biaya untuk costs are therefore eligible for
memperoleh”) dan diharapkan dapat capitalisation under SFAS No. 115 and
dipulihkan. Beban tersebut dengan recognised as assets. Such costs will be
demikian memenuhi syarat kapitalisasi amortised on a systematic basis that is
berdasarkan PSAK No. 115 dan diakui consistent with the transfer of the goods
sebagai aset. Beban tersebut or services to which an asset relates.
diamortisasi dengan cara sistematis
sejalan dengan penyerahan barang atau
jasa yang terkait dengan aset tersebut.
ii. Beban-beban lainnya ii. Other expenses
Beban-beban lainnya diakui pada saat Other expenses are recognised when
terjadinya. they are incurred.
ac. Penghasilan keuangan ac. Finance income
Penghasilan keuangan diakui dengan Finance income is recognised using the
menggunakan metode suku bunga efektif. effective interest method. When a loan or
Ketika pinjaman atau piutang mengalami receivable is impaired, the Group reduces the
penurunan nilai, Grup mengurangi nilai carrying amount to its recoverable amount,
tercatatnya menjadi jumlah terpulihkannya, being the estimated future cash flows
yakni estimasi arus kas masa depan yang discounted at the original effective interest rate
didiskontokan berdasarkan suku bunga efektif of the instrument, and continues to unwind the
awal dari instrumen tersebut, dan terus discount as finance income. Finance income
mengamortisasi diskonto sebagai penghasilan on impaired loans and receivables is
keuangan. Penghasilan keuangan atas recognised using the original effective interest
pinjaman yang diberikan dan piutang yang rate.
mengalami penurunan nilai diakui
menggunakan suku bunga efektif awal.
ad. Pajak penghasilan kini dan tangguhan ad. Current and deferred income tax
Beban pajak terdiri dari pajak kini dan pajak Tax expense comprises current and deferred
tangguhan. Pajak diakui dalam laba rugi, tax. Tax is recognised in profit or loss, except
kecuali jika pajak itu terkait dengan kejadian to the extent that it relates to items recognised
atau transaksi yang diakui di penghasilan in other comprehensive income or directly in
komprehensif lain atau langsung diakui ke equity. In this case, the tax expense is
ekuitas. Dalam hal ini, beban pajak tersebut recognised in other comprehensive income or
masing-masing diakui pada penghasilan directly in equity, respectively.
komprehensif lain atau secara langsung
dicatat ke ekuitas.
Page 76
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/55 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
ad. Pajak penghasilan kini dan tangguhan ad. Current and deferred income tax
(lanjutan) (continued)
Beban pajak kini dihitung berdasarkan The current income tax charge is calculated
peraturan perpajakan yang berlaku pada on the basis of the tax laws enacted as at the
tanggal pelaporan keuangan, di negara reporting date in the countries where the
dimana Perusahaan dan entitas anaknya Company and its subsidiaries operate and
beroperasi dan menghasilkan penghasilan generate taxable income. Management
kena pajak. Manajemen secara periodik periodically evaluates the positions taken in
mengevaluasi posisi yang diambil dalam Surat Annual Tax Returns with respect to situations
Pemberitahuan Tahunan sehubungan dengan in which the applicable tax regulations are
situasi dimana aturan pajak yang berlaku subject to interpretation. It establishes a
membutuhkan interpretasi atas peraturan provision where appropriate on the basis of
pajak yang berlaku. Jika perlu, manajemen the amounts expected to be paid to the tax
menentukan provisi dibentuk berdasarkan authorities.
jumlah yang diharapkan akan dibayar pada
otoritas pajak.
Untuk penghasilan yang menjadi subjek pajak For income that is subject to final tax, tax
penghasilan final, beban pajak diakui secara expenses are recognised proportionally with
proporsional dengan jumlah pendapatan the accounting revenue recognised and
akuntansi yang diakui dan disajikan sebagai presented as part of the operating expenses
bagian dari beban operasional pada tahun in the current year, as this tax does not satisfy
berjalan dikarenakan pajak tersebut tidak the criteria of income tax.
memenuhi kriteria sebagai pajak penghasilan.
Pajak penghasilan tangguhan diakui, dengan Deferred income tax is recognised, using the
menggunakan metode liabilitas untuk semua liability method, on temporary differences
perbedaan temporer antara dasar pengenaan arising between the tax bases of assets and
pajak aset dan liabilitas dengan nilai liabilities and their carrying amounts in the
tercatatnya pada laporan keuangan consolidated financial statements. However,
konsolidasian. Namun, liabilitas pajak deferred tax liabilities are not recognised if
tangguhan tidak diakui jika timbul dari they arise from the initial recognition of
pengakuan awal goodwill; dan pada saat goodwill; and deferred income tax is not
pengakuan awal suatu aset atau liabilitas yang accounted for if it arises from the initial
timbul dari transaksi selain kombinasi bisnis recognition of an asset or liability in a
yang pada saat transaksi tersebut tidak transaction other than a business combination
mempengaruhi laba rugi akuntansi maupun that at the time of the transaction affects
laba rugi pajak dan tidak menimbulkan neither accounting nor taxable profit or loss
perbedaan temporer kena pajak dan and does not give rise to equal taxable and
perbedaan temporer dapat dikurangi dalam deductible temporary differences. Deferred
jumlah yang sama. Pajak penghasilan income tax is determined using the tax rates
tangguhan ditentukan menggunakan tarif that have been enacted or substantively
pajak yang berlaku atau yang secara enacted at the end of the reporting year and
substansial telah berlaku pada akhir tahun are expected to apply when the related
pelaporan dan diharapkan diterapkan jika aset deferred income tax asset is realised or the
pajak penghasilan tangguhan direalisasikan deferred income tax liability is settled.
atau liabilitas pajak penghasilan tangguhan
diselesaikan.
Page 77
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/56 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
ad. Pajak penghasilan kini dan tangguhan ad. Current and deferred income tax
(lanjutan) (continued)
Aset pajak penghasilan tangguhan diakui Deferred income tax assets are recognised
hanya jika besar kemungkinan jumlah only to the extent that it is probable that future
penghasilan kena pajak di masa depan akan taxable profits will be available against which
memadai untuk dikompensasi dengan the temporary differences can be utilised.
perbedaan temporer yang masih dapat
digunakan.
Liabilitas dan aset pajak tangguhan tidak Deferred tax liabilities and assets are not
diakui untuk perbedaan temporer antara nilai recognised for temporary differences
tercatat dan dasar pengenaan pajak atas between the carrying amount and tax bases
investasi pada asosiasi dan ventura bersama of investments in associate and joint ventures
dimana Grup dapat mengendalikan waktu where the Group is able to control the timing
pembalikan perbedaan temporer dan of the reversal of the temporary differences
kemungkinan besar perbedaan tersebut tidak and it is probable that the differences will not
akan dibalik di masa mendatang. be reversed in the foreseeable future.
Aset dan liabilitas pajak penghasilan Deferred income tax assets and liabilities are
tangguhan dapat saling hapus jika terdapat offset when there is a legally enforceable right
hak yang berkekuatan secara hukum untuk to offset current tax assets against current tax
melakukan saling hapus antara aset pajak kini liabilities.
dengan liabilitas pajak kini.
Selain pajak penghasilan, Grup juga mengakui In addition to income tax, the Group also
bentuk pembayaran lain ke Pemerintah yang recognises other types of payments to the
dihitung berdasarkan produksi atau Government that are calculated based on
pendapatan (yaitu biaya royalti). Iuran production or revenue (i.e. royalty fees).
eksploitasi dan royalti dianggap sebagai pajak Exploitation fees and royalty fees are
penghasilan apabila mereka memiliki accounted for as income taxes when they
karakteristik sebagai pajak penghasilan. Hal have the characteristics of an income tax.
ini dipertimbangkan demikian apabila This is considered to be the case when the
dipersyaratkan oleh Pemerintah dan jumlah tax is imposed by the Government and the
terutang didasarkan pada penghasilan kena amount payable is based on taxable income
pajak daripada kuantitas fisik yang diproduksi rather than on physical quantities produced or
atau persentase dari penjualan. Untuk a percentage of revenue. For such
perjanjian yang demikian, pajak penghasilan arrangements, current and deferred income
dan pajak penghasilan ditangguhkan akan tax is provided on the same basis as
dicatat sesuai dengan penjelasan di atas described above for other forms of taxation.
untuk bentuk lain perpajakan. Kewajiban Grup The obligations of the Group arising from
yang timbul dari ketentuan iuran eksploitasi exploitation fees or royalty arrangements
atau royalti dalam PKP2B atau IUPK sebagai under AI’s CCA or IUPK for the Continuation
Kelanjutan Operasi Kontrak/Perjanjian AI atau of Contract/Agreement Operation or the AMC
PKP2B entitas-entitas AMC, PC dan RC atau entities, PC and RC’s CCoWs or the IUPs of
Izin Usaha Pertambangan entitas other mining entities in the Group do not
pertambangan lain di dalam Grup tidak satisfy these criteria, therefore, they are
memenuhi kriteria sebagai pajak penghasilan, recognised as current provisions and
sehingga diakui sebagai provisi dan dicatat included in cost of revenue.
sebagai beban pokok pendapatan.
ae. Laporan segmen ae. Segment reporting
Segmen operasi dilaporkan dengan cara yang Operating segments are reported in a manner
konsisten dengan pelaporan internal yang consistent with the internal reporting provided
diberikan kepada pengambil keputusan to the chief operating decision-maker. The
operasional. Direksi merupakan pengambil chief operating decision-maker, who is
keputusan operasional yang bertanggung responsible for allocating resources and
jawab untuk mengalokasikan sumber daya assessing the performance of the operating
dan menilai kinerja segmen operasi dan segments and making strategic decisions,
membuat keputusan strategis. has been identified as the Board of Directors.
Page 78
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/57 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
2. INFORMASI KEBIJAKAN AKUNTANSI MATERIAL 2. MATERIAL ACCOUNTING POLICY INFORMATION
(lanjutan) (continued)
af. Kelompok lepasan yang diklasifikasikan af. Disposal groups held for sale and
sebagai dimiliki untuk dijual dan operasi discontinued operations
yang dihentikan
Operasi yang dihentikan adalah komponen A discontinued operation is a component of
dari entitas yang telah dilepas atau the entity that has been disposed of or is
diklasifikasikan sebagai dimiliki untuk dijual classified as held for sale and that represents
dan yang mewakili lini bisnis utama yang a separate major line of business or
terpisah atau area operasi geografis, geographical area of operations, is part of a
merupakan bagian dari rencana terkoordinasi single co-ordinated plan to dispose of such a
untuk melepaskan lini bisnis atau area operasi line of business or area of operations, or is a
tersebut, atau merupakan anak perusahaan subsidiary acquired exclusively with a view to
yang diakuisisi secara eksklusif dengan tujuan resale. The Company has elected an
untuk dijual kembali. Perusahaan telah accounting policy choice to eliminate
memilih kebijakan akuntansi untuk transactions between continuing and
mengeliminasi transaksi antara operasi yang discontinued operations. The Company will
berkelanjutan dan operasi yang dihentikan. eliminate the transactions against
Perusahaan akan mengeliminasi transaksi discontinued operation. The results of
tersebut terhadap operasi yang dihentikan. discontinued operations are presented
Perusahaan telah melakukan Hasil dari separately in the statements of
operasi yang dihentikan disajikan secara comprehensive income.
terpisah dalam laporan laba rugi
komprehensif.
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING JUDGEMENTS
Penyusunan laporan keuangan konsolidasian yang The preparation of consolidated financial statements
sesuai dengan Standar Akuntansi Keuangan di in conformity with Indonesian Financial Accounting
Indonesia mengharuskan manajemen untuk Standards requires management to make estimates
membuat estimasi dan asumsi yang mempengaruhi and assumptions that affect the reported amounts of
jumlah aset dan liabilitas yang dilaporkan dan assets and liabilities and the disclosure of contingent
pengungkapan aset dan liabilitas kontinjensi pada assets and liabilities at the reporting date and the
tanggal pelaporan, serta jumlah pendapatan dan reported amounts of revenue and expenses during
beban selama tahun pelaporan. Estimasi, asumsi, the reporting year. Estimates, assumptions and
dan pertimbangan tersebut dievaluasi secara terus judgements are continually evaluated and are based
menerus dan berdasarkan pengalaman historis dan on historical experience and other factors, including
faktor-faktor lainnya, termasuk harapan peristiwa di expectations of future events that are believed to be
masa datang yang diyakini wajar berdasarkan reasonable under the circumstances.
kondisi yang ada.
Grup telah mengidentifikasi hal-hal berikut dimana The Group has identified the following matters under
diperlukan pertimbangan, estimasi dan asumsi which significant judgements, estimates and
signifikan dan dimana hasil aktual dapat berbeda dari assumptions are made and where actual results may
estimasi tersebut jika menggunakan asumsi dan differ from these estimates under different
kondisi yang berbeda dan dapat mempengaruhi assumptions and conditions and may materially
secara material hasil keuangan atau posisi keuangan affect the consolidated financial results or financial
konsolidasian Grup yang dilaporkan dalam tahun position of the Group reported in future years.
mendatang.
Page 79
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/58 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Provisi atas kerugian kredit ekspektasian aset - Provision for ECL of financial assets
keuangan
Grup menggunakan matriks provisi untuk The Group uses a provision matrix to calculate
menghitung kerugian kredit ekspektasian piutang ECL for trade receivables. The provision rates
usaha. Tingkat provisi adalah berdasarkan hari are based on days past due for groupings of
jatuh tempo atas kelompok segmen pelanggan various customer segments that have similar
yang mempunyai karakteristik risiko kredit yang credit risk characteristics (e.g., by geography,
serupa (misalnya berdasarkan geografi, tipe product type, customer type and/or rating, and
produk, tipe dan/atau peringkat pelanggan, dan coverage by letters of credit and other forms).
nilai pertanggungan dari letter of credit dan
bentuk lain).
Matriks provisi pada mulanya didasarkan pada The provision matrix is initially based on the
tingkat gagal bayar historis Grup yang Group’s historical observed default rates. The
diobservasi. Grup akan memperbaharui matriks Group will calibrate the matrix to adjust the
untuk menyesuaikan pengalaman kerugian kredit historical credit loss experience with forward-
historis dengan informasi forward-looking. looking information. For instance, if forecast
Sebagai contoh, jika perkiraan atas kondisi economic conditions are expected to deteriorate
ekonomi diperkirakan memburuk selama periode over the next period, which can lead to an
depan, yang dapat menyebabkan meningkatnya increased number of defaults, the historical
jumlah gagal bayar, tingkat gagal bayar historis default rates are adjusted. At every reporting
disesuaikan. Pada setiap tanggal pelaporan, date, the historically observed default rates are
tingkat gagal bayar historis diperbaharui dan updated and changes in the forward-looking
perubahan estimasi forward-looking dianalisis. estimates are analysed.
Penilaian atas korelasi antara tingkat gagal bayar The assessment of the correlation between
historis yang diobservasi, perkiraan atas kondisi historically observed default rates, forecast
ekonomi dan kerugian kredit ekspektasian economic conditions and ECL is a significant
merupakan estimasi yang signifikan. Jumlah estimate. The amount of ECL is sensitive to
kerugian kredit ekspektasian paling dipengaruhi changes in circumstances and forecast
oleh perubahan keadaan dan perkiraan kondisi economic conditions. The Group’s historical
ekonomi. Pengalaman kerugian kredit historis credit loss experience and forecast of economic
Grup dan perkiraan kondisi ekonomi juga conditions may also not be representative of a
mungkin tidak menggambarkan gagal bayar customer’s actual default in the future.
aktual pelanggan di masa yang akan datang.
Selain provisi penurunan nilai kolektif, Grup juga In addition to a collective impairment provision,
menerapkan provisi khusus untuk aset the Group also implements specific provisions
keuangan selain piutang. Tingkat provisi tertentu for financial assets other than receivables. The
dievaluasi oleh manajemen berdasarkan faktor- level of a specific provision is evaluated by
faktor yang mempengaruhi kolektibilitas piutang. management on the basis of factors that affect
Dalam kasus ini, Grup menggunakan penilaian the collectability of the accounts. In these cases,
berdasarkan fakta dan keadaan terbaik yang the Group uses judgement based on the best
tersedia, termasuk namun tidak terbatas pada, available facts and circumstances, including but
lamanya hubungan Grup dengan pelanggan dan not limited to, the length of the Group’s
status kredit pelanggan berdasarkan laporan relationship with the customers and customers’
kredit pihak ketiga dan faktor pasar yang credit status based on third-party credit reports
diketahui, untuk mencatat cadangan khusus and known market factors, to record specific
untuk pelanggan terhadap jumlah yang jatuh allowances for customers against amounts due
tempo dalam jumlah yang diharapkan untuk in amounts that it expects to collect. These
dikumpulkan. Cadangan spesifik ini dievaluasi specific allowance are re-evaluated and
kembali dan disesuaikan karena informasi adjusted as additional information received
tambahan yang diterima mempengaruhi jumlah affects the amounts estimated.
yang diestimasi.
Page 80
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/59 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Sewa - Leases
Penentuan apakah suatu perjanjian Determining whether an arrangement is or
mengandung unsur sewa membutuhkan contains a lease requires careful judgement to
pertimbangan yang cermat untuk menilai apakah assess whether the arrangement conveys a
perjanjian tersebut memberikan hak untuk right to obtain substantially all the economic
mendapatkan secara substansial seluruh benefits from use of the asset throughout the
manfaat ekonomis dari penggunaan aset period of the use and the right to direct the use
identifikasian dan hak untuk mengarahkan of the asset, even if the right is not explicitly
penggunaan aset identifikasian, bahkan jika hak specified in the arrangement.
tersebut tidak dijabarkan secara eksplisit di
perjanjian.
Karena Grup tidak dapat dengan mudah Since the Group could not readily determine the
menentukan suku bunga implisit, manajemen implicit rate, management uses the Group’s
menggunakan suku bunga pinjaman inkremental incremental borrowing rate as a discount rate.
Grup sebagai tingkat diskonto. Ada beberapa There are a number of factors to consider in
faktor yang perlu dipertimbangkan dalam determining an incremental borrowing rate,
menentukan suku bunga pinjaman inkremental, many of which need judgement in order to be
yang banyak di antaranya memerlukan able to reliably quantify any necessary
pertimbangan untuk dapat secara andal adjustments to arrive at the final discount rates.
mengukur penyesuaian yang diperlukan untuk
sampai pada tingkat diskonto akhir.
Dalam menentukan suku bunga pinjaman In determining the incremental borrowing rate,
inkremental, Grup mempertimbangkan faktor- the Group considers the following main factors:
faktor utama berikut: risiko kredit korporat Grup, the Group’s corporate credit risk, the lease term,
jangka waktu sewa, jangka waktu pembayaran the lease payment term, the economic
sewa, lingkungan ekonomi, waktu di mana sewa environment, the time at which the lease is
dimasukkan, dan mata uang di mana entered into, and the currency in which the lease
pembayaran sewa ditentukan. payments are denominated.
Dalam menentukan jangka waktu sewa, Grup In determining the lease term, management
mempertimbangkan semua fakta dan keadaan considers all facts and circumstances that
yang menimbulkan insentif ekonomi untuk create an economic incentive to exercise an
menggunakan opsi perpanjangan, atau tidak extension option, or not exercise a termination
menggunakan opsi penghentian. Opsi option. Extension options (or periods after
perpanjangan (atau periode setelah opsi termination options) are only included in the
penghentian kontrak kerja) hanya termasuk lease term if the lease is reasonably certain to
dalam jangka waktu sewa jika cukup pasti akan be extended (or not terminated).
diperpanjang (atau tidak dihentikan).
Page 81
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/60 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Sewa (lanjutan) - Leases (continued)
Untuk sewa bangunan dan peralatan, berikut For leases of buildings and equipment, the
merupakan faktor-faktor yang pada umumnya following factors are normally the most relevant:
paling relevan:
• Jika terdapat penalti yang signifikan untuk • If there are significant penalties to terminate
mengakhiri (atau tidak memperpanjang), (or not extend), the Group is typically
Grup biasanya cukup pasti untuk reasonably certain to extend (or not
memperpanjang (atau tidak mengakhiri). terminate).
• Jika prasarana diperkirakan mempunyai nilai • If any leasehold improvements are expected
sisa yang signifikan, Grup biasanya cukup to have a significant remaining value, the
pasti untuk memperpanjang (atau tidak Group is typically reasonably certain to
mengakhiri). extend (or not terminate).
• Jika tidak, Grup mempertimbangkan faktor • Otherwise, the Group considers other factors
lain termasuk jangka waktu sewa historis including historical lease durations and the
dan biaya dan gangguan bisnis yang timbul costs and business disruption required to
untuk menggantikan aset sewa tersebut. replace the leased asset.
- Pajak penghasilan - Income taxes
Perhitungan beban pajak penghasilan masing- The calculation of income tax expense for each
masing perusahaan dalam Grup memerlukan company within the Group requires judgements
pertimbangan dan asumsi dalam menentukan and assumptions in determining the capital
penyisihan modal dan pengurangan beban allowances and deductibility of certain expenses
tertentu selama proses pengestimasian. during the estimation process.
Penghasilan yang diperoleh perusahaan- The revenue of the entities within the Group is
perusahaan dalam Grup kadang-kadang dapat sometimes also subject to both final and non-
dikenakan pajak final dan non-final. Penentuan final income tax. Determining the amount of
penghasilan yang dikenakan pajak final dan revenue subject to final and non-final tax as well
non-final dan juga biaya pengurang pajak as expenses relating to revenue from the non-
sehubungan dengan penghasilan yang final income tax regime requires judgements
dikenakan pajak non-final memerlukan and estimates.
pertimbangan dan estimasi.
Semua pertimbangan dan estimasi yang dibuat All judgements and estimates made by
manajemen seperti yang diungkapkan di atas management as discussed above may be
dapat dipertanyakan oleh Direktorat Jenderal challenged by the Directorate General of
Pajak (“DJP”). Sebagai akibatnya, terjadi Taxation (“DGT”). As a result, the ultimate tax
ketidakpastian dalam penentuan kewajiban determination becomes uncertain. The
pajak. Resolusi posisi pajak yang diambil oleh resolution of tax positions taken by the Group
Grup dapat berlangsung bertahun-tahun dan can take several years to complete and, in some
sangat sulit untuk memprediksi hasil akhirnya. cases, it is difficult to predict the ultimate
Apabila terdapat perbedaan perhitungan pajak outcome. Where the final outcome of these
dengan jumlah yang telah dicatat, perbedaan matters is different from the amounts initially
tersebut akan berdampak pada pajak recorded, such differences will have an impact
penghasilan dan pajak tangguhan dalam periode on the income tax and deferred income tax
dimana penentuan pajak tersebut dibuat. provision in the period in which this
determination is made.
Page 82
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/61 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Pajak penghasilan (lanjutan) - Income taxes (continued)
Aset pajak tangguhan, termasuk yang timbul dari Deferred tax assets, including those arising from
rugi fiskal, dan perbedaan temporer lainnya, tax losses carried forward and temporary
diakui hanya apabila dianggap lebih mungkin differences, are recognised only where it is
daripada tidak bahwa mereka dapat diterima considered more likely than not that they will be
kembali, dimana hal ini tergantung pada recovered, which depends on the generation of
kecukupan pembentukan laba kena pajak di sufficient future taxable profits. Similar to
masa depan. Sama seperti “penurunan nilai aset “impairment of non-financial assets” discussed
non-keuangan” didiskusikan di bawah, asumsi below, assumptions about the generation of
atas pembentukan laba kena pajak sangat future taxable profits are heavily affected by
dipengaruhi oleh estimasi dan asumsi management’s estimates and assumptions
manajemen atas tingkat produksi yang regarding the expected production levels, sales
diharapkan, volume penjualan, harga komoditas, volumes, commodity prices, etc, which are
dan lain-lain, yang mana terpapar risiko dan subject to risk and uncertainty, and hence there
ketidakpastian, sehingga ada kemungkinan is a possibility that changes in circumstances will
perubahan estimasi dan asumsi akan mengubah alter the projected future taxable profits.
proyeksi laba kena pajak di masa mendatang.
- Provisi pembongkaran, rehabilitasi, reklamasi - Provision for decommissioning, mine
dan penutupan tambang rehabilitation, reclamation and closure
Seperti yang dijelaskan pada Catatan 42 atas As discussed in Note 42 to these consolidated
laporan keuangan konsolidasian ini, terdapat financial statements, there are several
beberapa Peraturan Pemerintah dan Government and Ministerial Regulations dealing
Kementerian yang mengatur kewajiban with rehabilitation, reclamation and mine closure
rehabilitasi, reklamasi, dan penutupan tambang obligations of mining companies operating in
untuk perusahaan tambang yang beroperasi di Indonesia. Therefore, AI, JC, LC, MC, SCM,
Indonesia. Oleh karena itu, AI, JC, LC, MC, LSA and MIP have calculated provisions for
SCM, LSA, dan MIP menghitung provisi mine rehabilitation, reclamation and closure
rehabilitasi, reklamasi, dan penutupan tambang based on these regulations.
atas dasar peraturan-peraturan tersebut.
Seperti yang dijelaskan pada Catatan 2s laporan As discussed in Note 2s to these consolidated
keuangan konsolidasian ini, biaya reklamasi, financial statements, reclamation fee,
rehabilitasi, dan lingkungan yang berkaitan rehabilitation and environmental expenditure to
dengan pemulihan atas area terganggu selama be incurred related to the remediation of
tahap produksi dibebankan pada beban pokok disturbed areas during the production phase are
pendapatan pada saat kewajiban berkaitan charged to cost of revenue when the obligation
dengan pemulihan tersebut timbul selama arising from the disturbance occurs as extraction
proses penambangan. Reklamasi area progresses. The reclamation of disturbed areas
terganggu dan pembongkaran aset tambang and decommissioning of mining assets and
dan aset-aset berumur panjang lainnya akan other long-lived assets will be undertaken
dilakukan selama beberapa tahun mendatang several years into the future and precise
dan persyaratan atas reklamasi ini terus berubah requirements are constantly changing to satisfy
untuk memenuhi ekspektasi politik, lingkungan, political, environmental, safety and public
keamanan, dan publik. Dengan demikian waktu expectations. As such, the timing and amounts
pelaksanaan dan jumlah arus kas di masa of future cash flows required to settle the
mendatang yang dibutuhkan untuk memenuhi obligations at each of the reporting dates are
kewajiban pada setiap tanggal pelaporan subject to significant uncertainty. The key
dipengaruhi oleh ketidakpastian yang signifikan. assumptions used in determining the provision
Asumsi utama yang digunakan untuk for decommissioning, mine rehabilitation,
menentukan provisi pembongkaran, rehabilitasi, reclamation and closure included the life of
reklamasi dan penutupan tambang termasuk operation, estimated future costs, timing of
umur operasi, perkiraan biaya di masa activities, discount rates, and inflation rates.
mendatang, waktu kegiatan, tarif diskonto, dan
tingkat inflasi.
Page 83
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/62 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Estimasi cadangan - Reserve estimation
Cadangan batubara adalah bagian yang dapat Coal reserves are the economically mineable
ditambang secara ekonomis dari sumber daya part of coal resources that result in an estimated
batubara yang menghasilkan perkiraan tonase tonnage and quality which, in the opinion of the
dan kualitas yang, menurut pendapat orang yang competent person making the estimates, can be
berkompeten yang membuat perkiraan, dapat the basis of a technically and economically
menjadi dasar proyek yang layak secara teknis viable project, after taking account of material
dan ekonomis, setelah dengan relevant “Modifying Factors”.
mempertimbangkan “Faktor Pengubah” yang
relevan secara material.
Faktor Pengubah adalah pertimbangan yang Modifying Factors are considerations used to
digunakan untuk mengkonversi sumber daya convert coal resources to coal reserves. These
batubara menjadi cadangan batubara. Ini include, but are not restricted to, mining factors
termasuk, namun tidak terbatas pada, faktor (among others geological and technical factors
pertambangan (antara lain faktor geologi dan including quantities and qualities, production
teknis termasuk kuantitas dan kualitas, teknik techniques and stripping ratios based on deposit
produksi dan nisbah kupas berdasarkan karakter character), processing factors, infrastructure
deposit), faktor pengolahan, faktor infrastruktur, factors, economic factors (among others
faktor ekonomi (antara lain biaya produksi, biaya production cost, transport cost, future capital
transportasi, belanja modal masa depan, expenditure, mine closure obligations and
kewajiban penutupan tambang dan nilai tukar), exchange rates), marketing factors (among
faktor pemasaran (antara lain permintaan others commodity demand and commodity
komoditas dan harga komoditas), faktor hukum, prices), legal, environmental, social and
lingkungan, sosial dan pemerintah. governmental factors.
Grup menentukan dan melaporkan cadangan The Group determines and reports its coal
batubaranya berdasarkan prinsip yang terdapat reserves under the principles of the Australasian
dalam Australasian Joint Ore Reserves Joint Ore Reserves Committee (the “JORC”)
Committee untuk Pelaporan Hasil Eksplorasi, which is a member of the Committee for Mineral
Sumber Daya Mineral dan Cadangan Bijih Reserves International Reporting Standards (the
(“JORC”) yang merupakan anggota Komite “CRIRSCO”).
untuk Standar Pelaporan Cadangan Mineral
Internasional (“CRIRSCO”).
Memperkirakan jumlah dan/atau nilai kalori Estimating the quantity and/or calorific value of
cadangan batubara membutuhkan ukuran, coal reserves requires the size, shape and depth
bentuk, dan kedalaman lapisan batubara atau of coal seams or fields to be determined by
lapangan yang akan ditentukan dengan analysing geological data such as drilling
menganalisis data geologi seperti “uji petik” samples. This process may require complex and
(sampel) pengeboran. Proses ini mungkin difficult geological judgements to interpret the
memerlukan pertimbangan geologi yang data.
kompleks dan sulit untuk menginterpretasikan
data.
Page 84
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/63 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Estimasi cadangan (lanjutan) - Reserve estimation (continued)
Karena asumsi ekonomi yang digunakan untuk Because the economic assumptions used to
memperkirakan cadangan berubah dari tahun ke estimate reserves change from year to year and
tahun dan karena data geologi tambahan yang because additional geological data is generated
dihasilkan selama operasi, perkiraan cadangan during the course of operations, estimates of
dapat berubah dari tahun ke tahun. Perubahan reserves may change from year to year.
cadangan yang diestimasikan dapat Changes in estimated reserves may affect the
mempengaruhi hasil dan posisi keuangan Group’s consolidated financial results and
konsolidasian Grup dalam berbagai cara, financial position in a number of ways, including
diantaranya: the following:
• Nilai tercatat aset dapat terpengaruh akibat • Asset carrying amounts may be affected due
perubahan estimasi arus kas masa depan. to changes in the estimated future cash
flows.
• Penyusutan dan amortisasi yang dibebankan • Depreciation and amortisation charged to
ke dalam laba rugi dapat berubah dimana profit or loss may change where such
beban-beban tersebut ditentukan charges are determined based on the unit-
berdasarkan metode unit produksi, atau of-production method or where the economic
dimana masa manfaat ekonomi umur aset useful lives of assets change.
berubah.
• Provisi penutupan tambang dapat berubah • Provision for mine closure may change
apabila terjadi perubahan dalam perkiraan where changes in estimated reserves affect
cadangan yang mempengaruhi ekspektasi expectations about the timing or cost of
tentang waktu atau biaya kegiatan ini. these activities.
• Nilai tercatat aset/liabilitas pajak tangguhan • The carrying amount of deferred tax
dapat berubah karena perubahan estimasi assets/liabilities may change due to changes
atas kemungkinan terpulihkannya manfaat in estimates of the likelihood of the
pajak. recoverability of the tax benefits.
- Estimasi masa manfaat aset tetap - Estimating useful lives of fixed assets
Grup mengestimasi masa manfaat ekonomis The Group estimates the useful lives of its fixed
aset tetap berdasarkan utilisasi dari aset yang assets based on expected asset utilisation
diharapkan dan didukung dengan rencana dan supported by business plans and strategies that
strategi usaha dan ekspektasi perilaku pasar. also consider the expected market behaviour.
Estimasi dari masa manfaat aset tetap adalah The estimation of the useful lives of fixed assets
berdasarkan penelaahan Grup terhadap praktek is based on the Group’s assessment of industry
industri, evaluasi teknis internal dan pengalaman practice, internal technical evaluation and
untuk aset yang setara. Estimasi masa manfaat experience with similar assets. The estimated
ditelaah minimal setiap akhir periode pelaporan useful lives are reviewed at least at each
dan diperbarui jika ekspektasi berbeda dari financial period-end and are updated if
estimasi sebelumnya dikarenakan pemakaian expectations differ from previous estimates due
dan kerusakan fisik, keusangan secara teknis to physical wear and tear, technical or
atau komersial dan hukum atau pembatasan lain commercial obsolescence and legal or other
atas penggunaan dari aset. Akan tetapi, ada limitations on the use of the assets. However, it
kemungkinan bahwa hasil di masa depan dari is possible that future results of operations could
operasi dapat dipengaruhi secara material oleh be materially affected by changes in the
perubahan-perubahan dalam estimasi yang estimates brought about by changes in the
diakibatkan oleh perubahan faktor-faktor yang factors mentioned above. The changes in
disebutkan di atas. Perubahan pada estimasi estimated useful lives of fixed assets may affect
masa manfaat aset tetap dapat mempengaruhi the Group’s depreciation expenses charged
beban depresiasi Grup yang dibebankan ke through profit or loss.
dalam laba rugi.
Page 85
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/64 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Penurunan nilai aset non-keuangan dan goodwill - Impairment of non-financial assets and goodwill
Jumlah nilai yang dapat dipulihkan kembali dari The recoverable amount of a cash-generating
sebuah aset atau kelompok aset penghasil kas, asset or group of assets, including goodwill, is
termasuk goodwill, diukur berdasarkan nilai yang measured at the higher of its fair value less costs
lebih tinggi antara nilai wajar dikurangi biaya of disposal or value in use. The determination of
untuk menjual atau nilai pakai. Penentuan nilai fair value less costs of disposal or value in use
wajar dikurangi biaya untuk menjual atau nilai requires management to make estimates and
pakai mewajibkan manajemen untuk membuat assumptions regarding expected production
estimasi dan asumsi atas tingkat produksi yang levels, sales volumes, commodity prices
diharapkan, volume penjualan, harga komoditas (considering current and historical prices, price
(mempertimbangkan harga saat ini dan harga trends and related factors), reserves (see
masa lalu, tren harga, dan faktor-faktor terkait), “Reserve estimation”), operating costs, inflation
cadangan (lihat “Estimasi cadangan”), biaya rate, projected cash flows and post-tax discount
operasi, tingkat inflasi, proyeksi arus kas dan rates. These estimates and assumptions are
tingkat diskonto setelah pajak, belanja modal di subject to risk and uncertainty, and hence there
masa depan dan jangka waktu konsesi is a possibility that changes in circumstances will
pertambangan. Estimasi dan asumsi ini terpapar alter these projections, which may have an
risiko dan ketidakpastian, sehingga terdapat impact on the recoverable amount of the assets
kemungkinan perubahan situasi yang dapat and goodwill. In such circumstances, some or all
mengubah proyeksi ini, sehingga dapat of the carrying amounts of the assets and
mempengaruhi nilai aset yang dapat dipulihkan goodwill may be further impaired or the
kembali dari aset dan goodwill. Dalam keadaan impairment charges may be reduced with the
seperti itu, sebagian atau seluruh nilai tercatat impact being recorded in profit or loss.
aset dan goodwill mungkin akan mengalami
penurunan nilai lebih lanjut atau terjadi
pengurangan rugi penurunan nilai yang
dampaknya akan dicatat dalam laba rugi.
- Estimasi nilai wajar - Fair value estimation
Ketika nilai wajar aset keuangan dan liabilitas When the fair values of financial assets and
keuangan dicatat dalam laporan posisi financial liabilities recorded in the consolidated
keuangan konsolidasian tidak dapat diukur statements of financial position cannot be
berdasarkan harga dikutip dalam pasar aktif, measured based on quoted prices in active
nilai wajar ditentukan menggunakan teknik markets, their fair value is measured using
penilaian yang mencakup model Diskonto Arus valuation techniques including Discounted
Kas (“DAK”). Input untuk model ini diambil dari Cash Flow (“DCF”) models. The inputs to these
pasar yang dapat diobservasi dimana models are taken from observable markets
memungkinkan, tetapi tidak mudah dilakukan, where possible, but where this is not feasible, a
membutuhkan tingkat pertimbangan dalam degree of judgement is required in establishing
menentukan nilai wajar tersebut. Pertimbangan fair values. Judgements include considerations
mencakup pertimbangan atas input seperti risiko of inputs such as liquidity risk, credit risk and
likuiditas, risiko kredit dan volatilitas. Perubahan volatility. Changes in assumptions about these
asumsi mengenai faktor-faktor tersebut dapat factors could affect the reported fair value of
mempengaruhi nilai wajar instrumen keuangan financial instruments. Refer to Note 44(2) for
yang dilaporkan. Lihat Catatan 44(2) untuk further disclosures.
informasi lebih lanjut.
- Imbalan pensiun - Pension benefits
Nilai kini kewajiban pensiun tergantung pada The present value of the pension obligations
beberapa faktor yang ditentukan dengan dasar depends on a number of factors that are
aktuarial berdasarkan beberapa asumsi. Asumsi determined on an actuarial basis using a
yang digunakan untuk menentukan number of assumptions. The assumptions used
biaya/(penghasilan) pensiun neto mencakup in determining the net cost/(income) for
tingkat diskonto dan kenaikan gaji di masa pensions include the discount rate and future
datang. Adanya perubahan pada asumsi ini akan salary increase. Any changes in these
mempengaruhi jumlah tercatat kewajiban assumptions will have an impact on the carrying
pensiun. amount of pension obligations
Page 86
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/65 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Imbalan pensiun (lanjutan) - Pension benefits (continued)
Grup menentukan tingkat diskonto dan kenaikan The Group determines the appropriate discount
gaji masa datang yang sesuai pada akhir periode rate and future salary increase at the end of
pelaporan. Tingkat diskonto adalah tingkat suku each reporting period. The discount rate is
bunga yang harus digunakan untuk menentukan interest rate that should be used to determine
nilai kini atas estimasi arus kas keluar masa the present value of estimated future cash
depan yang diharapkan untuk menyelesaikan outflows expected to be required to settle the
kewajiban pensiun. Dalam menentukan tingkat pension obligations. In determining the
suku bunga yang sesuai, Grup appropriate discount rate the Group considers
mempertimbangkan tingkat suku bunga obligasi the interest rates of government bonds that are
pemerintah yang didenominasikan dalam mata denominated in the currency in which the
uang imbalan akan dibayar dan memiliki jangka benefits will be paid and that have terms to
waktu yang serupa dengan jangka waktu maturity approximating the terms of the related
kewajiban pensiun yang terkait. pension obligation.
Asumsi kunci kewajiban pensiun lainnya Other key assumptions for pension obligations
sebagian ditentukan berdasarkan kondisi pasar are based in part on current market conditions.
saat ini. Informasi tambahan diungkapkan pada Additional information is disclosed in Note 21.
Catatan 21.
- Kepentingan dalam pengaturan bersama - Interests in joint arrangements
Pertimbangan diperlukan untuk menentukan Judgement is required to determine when the
ketika Grup memiliki pengendalian bersama, Group has joint control, which requires an
yang membutuhkan penilaian mengenai assessment of the relevant activities and when
aktivitas yang relevan dan ketika keputusan the decisions in relation to those activities
yang berkaitan dengan aktivitas tersebut require unanimous consent. The Group has
membutuhkan persetujuan dengan suara bulat. determined that the relevant activities for its joint
Grup menentukan bahwa aktivitas yang relevan arrangements are those relating to the financial,
untuk pengaturan bersama adalah aktivitas yang operating and capital decisions of the
berkaitan dengan keputusan keuangan, arrangement.
operasional dan modal dari pengaturan tersebut.
Pertimbangan juga diperlukan untuk Judgement is also required to classify a joint
mengklasifikasikan pengaturan bersama arrangement as either a joint operation or a joint
sebagai pengendalian bersama atau ventura venture. Classifying the arrangement requires
bersama. Pengklasifikasian pengaturan tersebut the Group to assess its rights and obligations
mengharuskan Grup untuk menilai hak dan arising from the arrangement. Specifically, it
kewajiban yang timbul dari pengaturan tersebut. considers:
Secara khusus, Grup mempertimbangkan:
• Struktur dari pengaturan bersama - apakah • The structure of the joint arrangement
dibentuk melalui kendaraan terpisah. whether it is structured through a separate
vehicle.
• Ketika pengaturan tersebut terstruktur • When the arrangement is structured through
melalui kendaraan terpisah, Grup juga a separate vehicle, the Group also
mempertimbangkan hak dan kewajiban yang considers the rights and obligations arising
timbul dari: from:
a. Bentuk legal dari kendaraan terpisah; a. The legal form of the separate vehicle;
b. Persyaratan dari perjanjian kontraktual; b. The terms of the contractual
dan arrangement; and
c. Fakta dan kondisi lainnya, jika relevan. c. Other relevant facts and circumstances.
Penilaian ini sering membutuhkan pertimbangan This assessment often requires significant
yang signifikan. Kesimpulan yang berbeda judgement. A different conclusion on joint control
mengenai pengendalian bersama dan apakah and on whether the arrangement is a joint
suatu pengaturan adalah sebuah operasi operation or a joint venture, may materially affect
bersama atau ventura bersama, dapat memiliki the consolidated financial statements.
dampak material terhadap laporan keuangan
konsolidasian.
Page 87
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/66 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
3. ESTIMASI DAN PERTIMBANGAN AKUNTANSI 3. CRITICAL ACCOUNTING ESTIMATES AND
YANG PENTING (lanjutan) JUDGEMENTS (continued)
- Kepentingan dalam pengaturan bersama - Interests in joint arrangements (continued)
(lanjutan)
Pada tanggal 31 Desember 2024, Grup memiliki As at 31 December 2024, the Group has joint
pengaturan bersama yang terstruktur melalui arrangements that are structured through joint
ventura bersama, PT Bhimasena Power ventures, being PT Bhimasena Power
Indonesia (“BPI”), PT Tanjung Power Indonesia Indonesia (“BPI”), PT Tanjung Power
(“TPI”), PT Kayan Hydropower Nusantara Indonesia (“TPI”), PT Kayan Hydropower
(“KHN”), dan PT Bayu Energi Listrik Lestari dan Nusantara (“KHN”), and PT Bayu Energi Listrik
entitas anaknya (“BELL”) (2023: BPI, TPI, Kestrel Lestari and its subsidiary (“BELL”) (2023: BPI,
Coal Group Pty Ltd (“Kestrel”), PT Dumai Tirta TPI, Kestrel Coal Group Pty Ltd (“Kestrel”), PT
Persada (“DTP”), PT Grenex Tirta Mandiri Dumai Tirta Persada (“DTP”), PT Grenex Tirta
(“GTM”), PT Bhakti Energi Persada dan entitas Mandiri (“GTM”), PT Bhakti Energi Persada
anaknya (“BEP”), KHN, TCU dan BELL). Struktur and its subsidiaries (“BEP”), KHN, TCU dan
dan persyaratan dari perjanjian kontraktual BELL). These structures and the terms of the
mengindikasikan bahwa Grup memiliki hak atas contractual arrangements indicate that the
aset bersih dari pengaturan bersama tersebut. Group has rights to the net assets of the
Grup menilai fakta dan kondisi lain yang arrangements. The Group also assessed the
berkaitan dengan pengaturan ini dan other facts and circumstances relating to these
menyimpulkan bahwa pengaturan tersebut arrangements and concluded that the
merupakan sebuah ventura bersama. Lihat arrangements are joint ventures. Refer to
Catatan 11 untuk informasi lebih lanjut. Note 11 for further information.
4. KAS DAN SETARA KAS 4. CASH AND CASH EQUIVALENTS
2024 2023
Kas 12 105 Cash on hand
Kas di bank - Rupiah Cash in banks - Rupiah
PT Bank Mandiri (Persero) Tbk PT Bank Mandiri (Persero) Tbk
(“Bank Mandiri”) 269,901 323,211 (“Bank Mandiri”)
PT Bank Rakyat Indonesia PT Bank Rakyat Indonesia
(Persero) Tbk (“BRI”) 176,136 68,776 (Persero) Tbk (“BRI”)
PT Bank CIMB Niaga Tbk 136,478 240 PT Bank CIMB Niaga Tbk
PT Bank BTPN Tbk 68,705 13,406 PT Bank BTPN Tbk
PT Bank Central Asia Tbk 9,840 747 PT Bank Central Asia Tbk
PT Bank UOB Indonesia 6,248 31,089 PT Bank UOB Indonesia
PT Bank OCBC NISP Tbk 2,289 35,957 PT Bank OCBC NISP Tbk
PT Bank DBS Indonesia 1,266 4,507 PT Bank DBS Indonesia
PT Bank Negara Indonesia PT Bank Negara Indonesia
(Persero) Tbk (“BNI”) 1,246 8,309 (Persero) Tbk (“BNI”)
PT Bank Permata Tbk 55 18,876 PT Bank Permata Tbk
Lain-lain 58 188 Others
Total rekening Rupiah 672,222 505,306 Total Rupiah accounts
Page 88
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/67 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
4. KAS DAN SETARA KAS (lanjutan) 4. CASH AND CASH EQUIVALENTS (continued)
2024 2023
Kas di bank - Dolar AS Cash in banks - US Dollars
BRI 423,034 684,738 BRI
Bank Mandiri 247,316 735,335 Bank Mandiri
PT Bank BTPN Tbk 20,958 124,261 PT Bank BTPN Tbk
PT Bank OCBC NISP Tbk 3,255 24,093 PT Bank OCBC NISP Tbk
PT Bank DBS Indonesia 2,319 103,813 PT Bank DBS Indonesia
PT Bank Permata Tbk 420 63,010 PT Bank Permata Tbk
PT Bank UOB Indonesia 224 212,299 PT Bank UOB Indonesia
Sumitomo Mitsui Banking Sumitomo Mitsui Banking
Corporation (“SMBC”) 2 17,080 Corporation (“SMBC”)
BNI 1 204,046 BNI
DBS Bank Ltd - 53,472 DBS Bank Ltd
PT Bank Maybank
Indonesia Tbk - 52,764 PT Bank Maybank Indonesia Tbk
United Overseas Bank Ltd - 10,518 United Overseas Bank Ltd
Lain-lain 545 2,272 Others
Total rekening Dolar AS 698,074 2,287,701 Total US Dollars accounts
Kas di bank - Mata uang lain Cash in banks - Other currencies
Lain-lain 2 1,327 Others
Total kas di bank 1,370,298 2,794,334 Total cash in banks
Deposito berjangka - Rupiah Time deposits - Rupiah
BRI 27,348 116,040 BRI
PT Bank OCBC NISP Tbk 6,218 13,421 PT Bank OCBC NISP Tbk
Lain-lain 2,042 649 Others
Total deposito berjangka Rupiah 35,608 130,110 Total Rupiah time deposits
Deposito berjangka - Dolar AS Time deposits - US Dollars
PT Bank Permata Tbk - 168,040 PT Bank Permata Tbk
SMBC - 55,000 SMBC
PT Bank QNB Indonesia Tbk - 50,256 PT Bank QNB Indonesia Tbk
BNI - 49,205 BNI
DBS Bank Ltd - 30,173 DBS Bank Ltd
United Overseas Bank Ltd - 23,000 United Overseas Bank Ltd
BRI - 10,000 BRI
Lain-lain - 1,009 Others
Total deposito berjangka
Dolar AS - 386,683 Total US Dollars time deposits
Total deposito berjangka 35,608 516,793 Total time deposits
Total 1,405,918 3,311,232 Total
Tidak ada kas dan setara kas yang dimiliki oleh pihak There are no cash and cash equivalents held with
berelasi. related parties.
Page 89
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/68 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
4. KAS DAN SETARA KAS (lanjutan) 4. CASH AND CASH EQUIVALENTS (continued)
Deposito berjangka yang dimiliki Grup memiliki jatuh Time deposits owned by the Group have maturity
tempo kurang dari tiga bulan sejak penempatannya dates less than three months since the placement
dan tidak dijaminkan. and are unsecured.
Sebagian rekening bank milik KAI dijadikan jaminan Certain bank accounts owned by KAI were pledged
pinjaman bank. for bank loans.
Tingkat suku bunga kontraktual deposito berjangka The contractual interest rates on time deposits
selama tahun berjalan adalah sebagai berikut: during the year were as follows:
2024 2023
Rupiah 5.00% - 6.50% 2.10% - 6.25% Rupiah
Dolar AS 4.79% - 6.35% 2.00% - 6.05% US Dollars
Kas dan setara kas termasuk kas yang ditempatkan ke Cash and cash equivalents include the cash held in
dalam rekening khusus devisa hasil ekspor dari a special account for foreign exchange export
sumber daya alam sesuai dengan Peraturan proceeds from natural resources in accordance with
Pemerintah No. 36/2023 (Catatan 41z). the Government Regulation No. 36/2023
(Note 41z).
5. KAS DAN DEPOSITO BERJANGKA YANG 5. RESTRICTED CASH AND TIME DEPOSITS
DIBATASI PENGGUNAANNYA
2024 2023
Kas di bank - Dolar AS Cash in bank - US Dollars
PT Bank Permata Tbk 3,851 4,054 PT Bank Permata Tbk
Deposito berjangka - Rupiah Time deposits - Rupiah
Bank Mandiri 684 2,092 Bank Mandiri
BRI 51 3,666 BRI
BNI - 775 BNI
PT Bank Pembangunan Daerah PT Bank Pembangunan Daerah
Sumatera Selatan Sumatera Selatan
dan Bangka Belitung (“BPD”) - 387 and Bangka Belitung (“BPD”)
Total deposito berjangka Rupiah 735 6,920 Total Rupiah time deposits
Deposito berjangka - Dolar AS Time deposits - US Dollars
Bank Mandiri 5,293 15,042 Bank Mandiri
BRI 4,910 30,290 BRI
Total deposito berjangka
Dolar AS 10,203 45,332 Total US Dollars time deposits
Total deposito berjangka 10,938 52,252 Total time deposits
Total 14,789 56,306 Total
Dikurangi: bagian lancar 3,851 4,054 Less: current portion
Bagian tidak lancar 10,938 52,252 Non-current portion
Page 90
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/69 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
5. KAS DAN DEPOSITO BERJANGKA YANG 5. RESTRICTED CASH AND TIME DEPOSITS
DIBATASI PENGGUNAANNYA (lanjutan) (continued)
Tingkat suku bunga kontraktual deposito berjangka The contractual interest rates on the restricted time
yang dibatasi penggunaannya selama tahun berjalan deposits during the year were as follows:
adalah sebagai berikut:
2024 2023
Rupiah 1.80% - 6.25% 2.25% - 6.25% Rupiah
Dolar AS 1.00% - 4.00% 0.20% - 2.00% US Dollars
Tidak ada kas dan deposito berjangka yang dibatasi There are no restricted cash and time deposits held
penggunaannya dengan pihak berelasi. with related parties.
Kas di bank yang dibatasi penggunaannya The restricted cash in bank is placed as a debt
ditempatkan sebagai debt service reserve account service reserve account (“DSRA”) in PT Bank
(“DSRA”) pada PT Bank Permata Tbk berkaitan Permata Tbk related to a US$80,000 facility
dengan perjanjian fasilitas AS$80.000 (Catatan 19c). agreement (Note 19c). The restricted time deposits
Deposito berjangka yang dibatasi penggunaannya are placed as security for mine rehabilitation,
ditempatkan sebagai jaminan rehabilitasi tambang, reclamation and post-mining guarantees with Bank
reklamasi dan pascatambang pada Bank Mandiri, BRI, Mandiri, BRI, BNI and BPD (Note 42), including
BNI dan BPD (Catatan 42), termasuk bunga yang rolled-over interest on maturity.
diperpanjang pada saat jatuh tempo.
6. INVESTASI LAIN-LAIN 6. OTHER INVESTMENTS
Rincian seluruh investasi lain-lain yang dimiliki oleh Details of other investments owned by the Group are
Grup adalah sebagai berikut: as follows:
2024 2023
Aset keuangan pada nilai wajar
melalui penghasilan
komprehensif lain 627,693 487,691 Financial assets at FVOCI
Aset keuangan pada nilai wajar
melalui laba rugi - 61,768 Financial assets at FVTPL
Total 627,693 549,459 Total
Dikurangi: bagian lancar 627,693 48,271 Less: current portion
Bagian tidak lancar - 501,188 Non-current portion
Page 91
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/70 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
6. INVESTASI LAIN-LAIN (lanjutan) 6. OTHER INVESTMENTS (continued)
a. Aset keuangan pada nilai wajar melalui a. Financial assets at FVOCI
penghasilan komprehensif lain
Aset keuangan pada nilai wajar melalui Financial assets at FVOCI represent
penghasilan komprehensif lain terdiri dari investments in listed share on a stock
investasi saham pada perusahaan yang exchange and investment in unlisted equity
diperdagangkan di bursa dan investasi pada efek securities.
ekuitas yang tidak diperdagangkan di bursa.
Mutasi nilai wajar atas aset keuangan pada nilai Fair value movements in financial assets at
wajar melalui penghasilan komprehensif lain FVOCI for the year ended 31 December 2024
tahun yang berakhir pada tanggal 31 Desember with net gains amounting to US$182,076
2024 dengan keuntungan neto sebesar (2023: US$12,850) are presented in other
AS$182.076 (2023: AS$12.850) disajikan pada comprehensive income for the year.
penghasilan komprehensif lain tahun berjalan.
b. Aset keuangan pada nilai wajar melalui laba b. Financial assets at FVTPL
rugi
Aset keuangan pada nilai wajar melalui laba rugi Financial assets at FVTPL represent
terdiri dari investasi saham pada perusahaan investments in listed share on a stock
yang diperdagangkan di bursa. exchange.
Nilai wajar efek yang diperdagangkan di bursa The fair values of listed securities are based on
dihitung berdasarkan harga dikutip dalam pasar quoted prices in active markets.
aktif.
Pada tanggal 31 Desember 2024, Grup tidak lagi As at 31 December 2024, the Group no longer
mengakui aset keuangan pada nilai wajar melalui recognise financial assets at FVTPL since the
laba rugi karena Perusahaan secara efektif telah Company has effectively sold most of its share
menjual sebagian besar kepemilikan saham di ownership in Adaro, therefore, the Company
Adaro sehingga Perusahaan menghentikan has derecognised Adaro Group and presents
pengakuan Grup Adaro dan menyajikannya it as discontinued operation (Note 40).
sebagai operasi yang dihentikan (Catatan 40).
Page 92
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/71 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
6. INVESTASI LAIN-LAIN (lanjutan) 6. OTHER INVESTMENTS (continued)
Pada tanggal 31 Desember 2024, eksposur maksimum As at 31 December 2024, the maximum exposure to
atas risiko kredit pada tanggal pelaporan adalah credit risk at the reporting date is the carrying
sebesar nilai tercatat investasi pada efek ekuitas yang amount of the investments in equity securities
diklasifikasikan sebagai aset keuangan pada nilai classified as financial assets at FVOCI
wajar melalui penghasilan komprehensif lain (2023: financial assets at FVOCI and FVTPL).
(2023: aset keuangan pada nilai wajar melalui
penghasilan komprehensif lain dan melalui laba rugi).
Pada tanggal 31 Desember 2024, investasi lain-lain As at 31 December 2024, other investments are
didenominasikan dalam mata uang Rupiah denominated in Rupiah (2023: US Dollars and
(2023: Dolar AS dan Rupiah). Rupiah).
Pada tanggal 31 Desember 2023, tidak ada investasi As at 31 December 2023, there were no other
lain-lain pada pihak berelasi. investments with related parties.
Lihat Catatan 44(2) untuk informasi nilai wajar dari Refer to Note 44(2) for information on the fair value
investasi lain-lain. of other investments.
7. PIUTANG USAHA DAN PIUTANG LAIN-LAIN 7. TRADE AND OTHER RECEIVABLES
a. Piutang usaha a. Trade receivables
2024 2023
Pihak ketiga 44,219 470,290 Third parties
Pihak berelasi 305,754 66,703 Related parties
Sub-total 349,973 536,993 Sub-total
Dikurangi: cadangan kerugian - 16,499 Less: loss allowance
Total, neto 349,973 520,494 Total, net
Piutang usaha Grup berdasarkan mata uang The Group’s trade receivables are
adalah sebagai berikut: denominated in the following currencies:
2024 2023
Rupiah 274,866 203,105 Rupiah
Dolar AS 75,107 333,888 US Dollars
Total 349,973 536,993 Total
Analisis umur piutang usaha adalah sebagai The aging analysis of trade receivables is as
berikut: follows:
2024 2023
Lancar 291,269 496,802 Current
Jatuh tempo 1 - 30 hari 29,315 20,625 Overdue by 1 - 30 days
Jatuh tempo 31 - 60 hari 19,276 406 Overdue by 31 - 60 days
Jatuh tempo 61 - 90 hari 5,910 397 Overdue by 61 - 90 days
Jatuh tempo lebih dari 90 hari 4,203 18,763 Overdue by more than 90 days
Total 349,973 536,993 Total
Page 93
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/72 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
7. PIUTANG USAHA DAN PIUTANG LAIN-LAIN 7. TRADE AND OTHER RECEIVABLES (continued)
(lanjutan)
a. Piutang usaha (lanjutan) a. Trade receivables (continued)
Perubahan cadangan kerugian piutang usaha The changes in the loss allowance on trade
adalah sebagai berikut: receivables were as follows:
2024 2023
Saldo awal tahun 16,499 10,561 Balance at the beginning of the year
Penambahan - 6,080 Additions
Pembalikan cadangan
kerugian (966) (142) Reversal of loss allowance
Penghentian pengakuan atas
atas dampak operasi Derecognition due to
yang dihentikan (15,533) - discontinued operations
Saldo akhir tahun - 16,499 Balance at the end of the year
Lihat Catatan 34 untuk informasi rincian transaksi Refer to Note 34 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.
Lihat Catatan 44(1) untuk informasi tentang risiko Refer to Note 44(1) for information about the
kredit Grup. Group’s exposure to credit risk.
Manajemen Grup berpendapat bahwa cadangan The Group’s management is of the opinion that
kerugian atas piutang usaha pada tanggal the loss allowance of trade receivables as at
31 Desember 2024 tidak material sehingga 31 December 2024 is not material. Therefore, a
cadangan kerugian kredit ekspektasian tidak provision for ECL is not considered necessary.
diperlukan.
b. Piutang lain-lain b. Other receivables
2024 2023
Pihak berelasi 46,721 26,096 Related parties
Pihak ketiga 43,494 97,871 Third parties
Total 90,215 123,967 Total
Dikurangi: bagian lancar 51,245 21,457 Less: current portion
Bagian tidak lancar 38,970 102,510 Non-current portion
Pada tanggal 31 Desember 2024, piutang lain-lain As at 31 December 2024, other receivables
sebagian besar merupakan piutang bunga. Pada mainly represent interest receivables. As at
tanggal 31 Desember 2023 : piutang lain-lain 31 December 2023: other receivables mainly
sebagian besar merupakan piutang dari EGAT represent receivables from EGAT International
International Company Limited (“EGATi”), Company Limited (“EGATi”), a non-controlling
kepentingan non-pengendali (Catatan 25) dan interest (Note 25) and interest receivables.
piutang bunga.
Lihat Catatan 34 untuk informasi rincian transaksi Refer to Note 34 for information on the details of
dan saldo dengan pihak berelasi. transactions and balances with related parties.
Lihat Catatan 44(1) untuk informasi tentang risiko Refer to Note 44(1) for information about the
kredit Grup. Group’s exposure to credit risk.
Manajemen Grup berpendapat bahwa cadangan The Group’s management is of the opinion that
kerugian atas piutang lain-lain pada tanggal the loss allowance of other receivables as at
31 Desember 2024 dan 2023 tidak material 31 December 2024 and 2023 is not material.
sehingga cadangan kerugian kredit ekspektasian Therefore, a provision for ECL is not considered
tidak diperlukan. necessary.
Page 94
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/73 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
8. UANG MUKA DAN BIAYA DIBAYAR DIMUKA 8. ADVANCES AND PREPAYMENTS
2024 2023
Uang muka pembelian aset Advances for the purchase of
tetap dan proyek 109,399 151,244 fixed assets and projects
Biaya keuangan
yang dibayar dimuka 8,992 19,994 Prepayment for financing costs
Sewa dan asuransi dibayar
dimuka 2,012 3,298 Prepaid rent and insurance
Uang muka kepada pemasok 657 9,656 Advances to suppliers
Uang muka royalti - 28,908 Royalties advance
Lain-lain 1,738 6,031 Others
Total 122,798 219,131 Total
Dikurangi: bagian lancar 4,138 47,671 Less: current portion
Bagian tidak lancar 118,660 171,460 Non-current portion
Manajemen berpendapat bahwa seluruh uang muka Management believes that all advances and
dan biaya dibayar dimuka tersebut dapat dipulihkan. prepayments are recoverable.
9. PERSEDIAAN 9. INVENTORIES
2024 2023
Persediaan batubara 47,650 78,344 Coal inventory
Suku cadang 27,080 43,739 Spare parts
Bahan bakar dan minyak
pelumas 19,710 36,029 Fuel and lubricants
Perlengkapan dan bahan
pendukung 4,910 10,340 Tools and supplies
Lain-lain 647 2,624 Others
Total 99,997 171,076 Total
Pada tanggal 31 Desember 2024 dan 2023, As at 31 December 2024 and 2023, the Group’s
persediaan Grup telah diasuransikan terhadap risiko inventories were covered by insurance against the
kerusakan signifikan dengan nilai pertanggungan risk of material damage with total coverage of
sebesar AS$94.694 (2023: AS$138.633). Manajemen US$94,694 (2023: US$138,633). The Group’s
Grup berpendapat bahwa persediaan telah management is of the opinion that the inventories
diasuransikan secara memadai untuk menutupi risiko are adequately insured to cover the risk of loss and
kehilangan dan kerusakan. damage.
Manajemen Grup berpendapat bahwa semua The Group’s management is of the opinion that the
persediaan dapat digunakan atau dijual dan nilai inventories can be either used or sold and the net
realisasi neto persediaan masih melebihi nilai tercatat realisable value of inventories exceeds the carrying
persediaan, sehingga tidak diperlukan adanya provisi amount of inventories. Therefore, a provision for
persediaan usang dan penurunan nilai pada tanggal obsolete stock and decline in value is not considered
31 Desember 2024 dan 2023. necessary as at 31 December 2024 and 2023.
Page 95
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/74 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
10. ASET TETAP 10. FIXED ASSETS
2024
Selisih
kurs dari
penjabaran Penghentian
laporan pengakuan
keuangan/ atas dampak
Exchange operasi yang
differences dihentikan/
Saldo due to Derecognition Saldo
awal/ financial due to akhir/
Beginning Penambahan/ Pengurangan/ Reklasifikasi/ statements discontinued Ending
balance Additions Disposals Reclassifications1) translation operations balance
Harga perolehan Acquisition costs
Kepemilikan langsung Direct ownership
Tanah 36,097 41 - - (81) (34,449) 1,608 Land
Bangunan 199,878 1,566 (9,408) 27,212 (140) (66,999) 152,109 Buildings
Infrastruktur 326,573 12,270 - 20,780 (646) (179,742) 179,235 Infrastructure
Pembangkit listrik 143,565 730 (171) - - - 144,124 Power plants
Mesin, peralatan Machineries, operational
operasional dan kendaraan 2,025,581 123,060 (36,927) 27,071 (636) (596,827) 1,541,322 equipment and vehicles
Kapal 435,933 72,743 (2,124) 2,795 (412) (508,935) - Vessels
Peralatan kantor 39,223 1,709 (958) 438 (110) (9,020) 31,282 Office equipment
Fasilitas peremukan Crushing and handling
dan pengolahan 530,925 438 - 39 - (371,089) 160,313 facilities
Jalan dan jembatan 466,231 15 - 2,283 - (280,145) 188,384 Roads and bridges
Sub-total 4,204,006 212,572 (49,588) 80,618 (2,025) (2,047,206) 2,398,377 Sub-total
Aset dalam pembangunan 263,737 705,150 (2,580) (54,362) (222) (421,050) 490,673 Construction in progress
Aset hak-guna Right-of-use assets
Tanah 5,842 - - (3,522) - (61) 2,259 Land
Waduk - 24,572 - 3,522 (600) - 27,494 Reservoir
Bangunan 13,276 1,287 (373) (98) 31 (1,911) 12,212 Buildings
Mesin, peralatan Machineries, operational
operasional dan kendaraan 150,174 17,913 (1,296) (14,788) 35 (7,563) 144,475 equipment and vehicles
Peralatan kantor 72 37 - 98 - (98) 109 Office equipment
Sub-total 169,364 43,809 (1,669) (14,788) (534) (9,633) 186,549 Sub-total
Total 4,637,107 961,531 (53,837) 11,468 (2,781) (2,477,889) 3,075,599 Total
Akumulasi penyusutan Accumulated depreciation
Kepemilikan langsung Direct ownership
Bangunan (96,485) (9,777) 5,610 (3,533) 58 36,469 (67,658) Buildings
Infrastruktur (178,464) (16,140) - 2,605 153 116,324 (75,522) Infrastructure
Pembangkit listrik (60,670) (5,729) 73 - - - (66,326) Power plants
Mesin, peralatan Machineries, operational
operasional dan kendaraan (1,565,232) (158,594) 32,699 (22,393) 277 556,663 (1,156,580) equipment and vehicles
Kapal (195,289) (23,260) 482 - 129 217,938 - Vessels
Peralatan kantor (31,099) (2,704) 718 (32) 83 7,522 (25,512) Office equipment
Fasilitas peremukan Crushing and handling
dan pengolahan (393,752) (7,589) - - - 367,774 (33,567) facilities
Jalan dan jembatan (298,585) (9,486) - - - 257,563 (50,508) Roads and bridges
Sub-total (2,819,576) (233,279) 39,582 (23,353) 700 1,560,253 (1,475,673) Sub-total
Aset hak-guna Right-of-use assets
Tanah (530) (1,495) - - 10 60 (1,955) Land
Bangunan (7,494) (2,724) 316 25 (21) 828 (9,070) Buildings
Mesin, peralatan Machineries, operational
operasional dan kendaraan (48,934) (22,321) 1,031 11,885 (38) 5,044 (53,333) equipment and vehicles
Peralatan kantor (65) (54) - (25) - 60 (84) Office equipment
Sub-total (57,023) (26,594) 1,347 11,885 (49) 5,992 (64,442) Sub-total
Total (2,876,599) (259,873) 40,929 (11,468) 651 1,566,245 (1,540,115) Total
Akumulasi penurunan nilai Accumulated impairment
Infrastruktur (5,264) - - - - - (5,264) Infrastructure
Mesin, peralatan Machineries, operational
operasional dan kendaraan (839) - - - - - (839) equipment and vehicles
Total (6,103) - - - - - (6,103) Total
Nilai buku neto 1,754,405 1,529,381 Net book value
Page 96
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/75 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
10. ASET TETAP (lanjutan) 10. FIXED ASSETS (continued)
2023
Selisih
kurs dari
penjabaran
laporan
keuangan/
Exchange
differences
Saldo due to Saldo
awal/ financial akhir/
Beginning Penambahan/ Pengurangan/ Reklasifikasi/ statements Ending
balance Additions1) Disposals Reclassifications2) translation balance
Harga perolehan Acquisition costs
Kepemilikan langsung Direct ownership
Tanah 38,204 1,120 - (3,505) 278 36,097 Land
Bangunan 192,626 2,811 (4,795) 8,944 292 199,878 Buildings
Infrastruktur 306,274 9,543 - 10,472 284 326,573 Infrastructure
Pembangkit listrik 143,565 - - - - 143,565 Power plants
Mesin, peralatan Machineries, operational
operasional dan kendaraan 1,947,015 154,966 (177,623) 100,819 404 2,025,581 equipment and vehicles
Kapal 377,473 39,336 (4,632) 23,486 270 435,933 Vessels
Peralatan kantor 33,275 5,746 (234) 367 69 39,223 Office equipment
Fasilitas peremukan Crushing and handling
dan pengolahan 526,473 - - 4,452 - 530,925 facilities
Jalan dan jembatan 449,110 - - 17,121 - 466,231 Roads and bridges
Sub-total 4,014,015 213,522 (187,284) 162,156 1,597 4,204,006 Sub-total
Aset dalam pembangunan 52,903 282,176 - (71,334) (8) 263,737 Construction in progress
Aset hak-guna Right-of-use assets
Tanah 2,320 3,559 - - (37) 5,842 Land
Bangunan 10,076 3,143 (7) - 64 13,276 Buildings
Mesin, peralatan Machineries, operational
operasional dan kendaraan 172,585 73,868 (1,524) (94,773) 18 150,174 equipment and vehicles
Peralatan kantor 72 - - - - 72 Office equipment
Sub-total 185,053 80,570 (1,531) (94,773) 45 169,364 Sub-total
Total 4,251,971 576,268 (188,815) (3,951) 1,634 4,637,107 Total
Akumulasi penyusutan Accumulated depreciation
Kepemilikan langsung Direct ownership
Bangunan (88,800) (12,016) 4,425 9 (103) (96,485) Buildings
Infrastruktur (161,064) (17,328) - - (72) (178,464) Infrastructure
Pembangkit listrik (54,941) (5,729) - - - (60,670) Power plants
Mesin, peralatan Machineries, operational
operasional dan kendaraan (1,503,215) (158,139) 168,385 (72,126) (137) (1,565,232) equipment and vehicles
Kapal (174,344) (22,125) 1,247 - (67) (195,289) Vessels
Peralatan kantor (28,786) (2,511) 234 12 (48) (31,099) Office equipment
Fasilitas peremukan Crushing and handling
dan pengolahan (386,524) (7,228) - - - (393,752) facilities
Jalan dan jembatan (289,841) (8,744) - - - (298,585) Roads and bridges
Sub-total (2,687,515) (233,820) 174,291 (72,105) (427) (2,819,576) Sub-total
Aset hak-guna Right-of-use assets
Tanah (398) (132) - - - (530) Land
Bangunan (5,390) (2,093) 2 - (13) (7,494) Buildings
Mesin, peralatan Machineries, operational
operasional dan kendaraan (100,524) (21,881) 1,374 72,105 (8) (48,934) equipment and vehicles
Peralatan kantor (48) (17) - - - (65) Office equipment
Sub-total (106,360) (24,123) 1,376 72,105 (21) (57,023) Sub-total
Total (2,793,875) (257,943) 175,667 - (448) (2,876,599) Total
Akumulasi penurunan nilai Accumulated impairment
Infrastruktur (5,264) - - - - (5,264) Infrastructure
Mesin, peralatan Machineries, operational
operasional dan kendaraan (839) - - - - (839) equipment and vehicles
Total (6,103) - - - - (6,103) Total
Nilai buku neto 1,451,993 1,754,405 Net book value
1) 1)
Termasuk penambahan dari akuisisi INS sebesar AS$329 Including additions from acquisition of INS amounting to US$329.
2) 2)
Terdapat reklasifikasi dari aset tetap ke uang muka dan biaya dibayar dimuka There are reclassifications from fixed assets to advances and prepayments
sebesar AS$3.951 pada tahun 2023. amounting to US$3,951 during 2023.
Page 97
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/76 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
10. ASET TETAP (lanjutan) 10. FIXED ASSETS (continued)
Beban penyusutan untuk tahun yang berakhir pada Depreciation expense for the years ended
tanggal 31 Desember 2024 dan 2023 dialokasikan 31 December 2024 and 2023 was allocated as
sebagai berikut: follows:
2024 2023
Beban pokok pendapatan
(Catatan 30) 206,560 205,135 Cost of revenue (Note 30)
Beban usaha (Catatan 31) 3,591 4,893 Operating expenses (Note 31)
Kapitalisasi sebagai aset tetap 612 - Capitalised as fixed assets
Beban penyusutan dari Depreciation expense from
operasi yang berlanjut 210,763 210,028 continuing operations
Beban penyusutan dari Depreciation expense from
operasi yang dihentikan 49,110 47,915 discontinued operations
Total 259,873 257,943 Total
Perhitungan kerugian atas pelepasan aset tetap untuk The calculation of loss on disposal of fixed assets for
tahun yang berakhir pada tanggal 31 Desember 2024 the years ended 31 December 2024 and 2023 was
dan 2023 adalah sebagai berikut: as follows:
2024 2023
Harga perolehan 53,837 188,815 Acquisition costs
Akumulasi penyusutan (40,929) (175,667) Accumulated depreciation
Nilai buku aset tetap Carrying amount of
yang dilepas 12,908 13,148 disposed fixed assets
Harga jual dari pelepasan Selling price from disposal of
aset tetap (10,198) (6,977) fixed assets
Kerugian atas
pelepasan aset tetap Loss on disposal of
2,710 6,171 fixed assets
(Keuntungan)/kerugian
pelepasan aset tetap (Gain)/loss on disposal
dari operasi yang of fixed assets from
berlanjut (Catatan 32) (1,160) 2,755 continuing operations (Note 32)
Kerugian atas pelepasan Loss on diposal of
aset tetap dari operasi fixed assets from
yang dihentikan 3,870 3,416 discontinued operations
Total 2,710 6,171 Total
Page 98
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/77 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
10. ASET TETAP (lanjutan) 10. FIXED ASSETS (continued)
Tidak ada perbedaan signifikan antara nilai wajar dan There is no significant difference between the fair
nilai buku aset tetap, kecuali beberapa aset tetap. value and carrying amount of fixed assets, except for
Pada tanggal 31 Desember 2024, total nilai wajar dan certain fixed assets. As at 31 December 2024, the
nilai buku aset tetap dari entitas operasi utama dalam total fair value and carrying amount of the fixed
Grup, MC dan LC, secara kolektif adalah sebesar assets of the main operating entities in the Group,
AS$425.556,957 (nilai penuh) dan AS$388.636,268 MC and LC collectively, amounted to
(nilai penuh), dan termasuk dalam hierarki nilai wajar US$425,556,957 (full amount) and US$388,636,268
Tingkat 3. Nilai tersebut berdasarkan laporan penilaian (full amount), respectively, and were classified as
independen dari Kantor Jasa Penilai Publik (“KJPP”) Level 3 in the fair value hierarchy This value is based
Benedictus Darmapuspita dan Rekan, penilai on independent valuation reports from Kantor Jasa
independen yang terdaftar di OJK, No. 00049/2.0103- Penilai Publik (“KJPP”) Benedictus Darmapuspita
00/PP/02/0121/1/II/2025 tanggal dan Rekan, registered as independent valuers with
24 Februari 2025 dan No. 00050/2.0103- OJK, No. 00049/2.0103-00/PP/02/0121/1/II/2025
00/PP/02/0121/1/II/2025 tanggal 24 Februari 2025. dated 24 February 2025 and No. 00050/2.0103-
00/PP/02/0121/1/II/2025 dated 24 February 2025,
respectively.
Pada tanggal 31 Desember 2024, aset tetap Grup telah As at 31 December 2024, the Group’s fixed assets
diasuransikan terhadap semua risiko kerusakan were insured against all risks of damage, with
dengan total pertanggungan kurang lebih sebesar total coverage of approximately US$4,289,029,
AS$4.289.029, kecuali untuk aset tetap yang tidak bisa except for fixed assets that could not be insured
diasuransikan seperti tanah dan aset dalam such as land and certain construction in progress.
pembangunan tertentu. Pada tanggal 31 Desember As at 31 December 2023, the Group’s fixed assets
2023, aset tetap Grup telah diasuransikan terhadap were insured against all risks of damage, with total
semua risiko kerusakan dengan total pertanggungan coverage of approximately US$5,558,497, except
kurang lebih sebesar AS$5.558.497, kecuali untuk for fixed assets that could not be insured such as
aset tetap yang tidak bisa diasuransikan seperti tanah, land, the Barito channel dredging and certain
pengerukan alur Barito, dan aset dalam pembangunan construction in progress.
tertentu.
Manajemen Grup berpendapat bahwa aset tetap telah The Group’s management is of the opinion that the
diasuransikan secara memadai pada tanggal fixed assets were adequately insured as at
31 Desember 2024 dan 2023. 31 December 2024 and 2023.
Pada tanggal 31 Desember 2024, harga perolehan As at 31 December 2024, the acquisition costs of
atas aset tetap Grup yang telah disusutkan penuh fixed assets which have been fully depreciated but
namun masih dipakai sebesar AS$839.391 (2023: are still in use amounted to US$839,391 (2023:
AS$1.911.738). US$1,911,738).
Pada tanggal 31 Desember 2024, aset hak-guna As at 31 December 2024, certain right-of-use assets
tertentu dengan nilai tercatat sebesar AS$89.343 with a carrying amount of US$89,343 (2023:
(2023: AS$96.586) dijaminkan terhadap liabilitas sewa US$96,586) were pledged for certain lease liabilities
tertentu (Catatan 18). (Note 18).
Pada tanggal 31 Desember 2024, beberapa aset tetap As at 31 December 2024, certain directly-owned
kepemilikan langsung tertentu telah dijaminkan fixed assets of the Group have been pledged as
sebagai jaminan untuk pinjaman Perjanjian Fasilitas security for Facility Agreement loan of KAI
KAI (Catatan 19a). Pada tanggal 31 Desember 2023, (Note 19a). As at 31 December 2023, certain
beberapa aset tetap kepemilikan langsung tertentu directly-owned fixed assets of the Group have been
telah dijaminkan sebagai jaminan untuk pinjaman pledged as security for a commercial property loan
properti komersial (Catatan 19i) dan pinjaman (Note 19i) and Facility Agreement loans of KAI and
Perjanjian Fasilitas KAI dan KPI (Catatan 19a dan KPI (Notes 19a and 19g)).
19g)).
Page 99
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/78 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
10. ASET TETAP (lanjutan) 10. FIXED ASSETS (continued)
Aset dalam pembangunan Construction in progress
Aset dalam pembangunan merupakan proyek yang Construction in progress represents projects that
belum selesai pada tanggal laporan posisi keuangan were not completed as at the date of the
konsolidasian dengan rincian sebagai berikut: consolidated statements of financial position as
follows:
Persentase Akumulasi Estimasi
penyelesaian/ biaya/ penyelesaian/
Aset dalam Percentage of Accumulated Estimated Construction
pembangunan completion costs completion in progress
2024 2024
Bangunan, pabrik dan Januari/January 2025 - Buildings, plant and
infrastruktur 2% - 99% 386,399 Desember/December 2025 infrastructure
Mesin, peralatan operasional Februari/February 2025 - Machineries, operational
dan kendaraan 2% - 90% 65,169 September 2025 equipment and vehicles
Januari/January 2025 -
Jalan dan jembatan 53% - 98% 39,105 September 2025 Roads and bridges
Total 490,673 Total
Persentase Akumulasi Estimasi
penyelesaian/ biaya/ penyelesaian/
Aset dalam Percentage of Accumulated Estimated Construction
pembangunan completion costs completion in progress
2023 2023
Bangunan, pabrik dan Januari/January 2024 - Buildings, plant and
infrastruktur 5% - 99% 229,951 Desember/December 2025 infrastructure
Desember/December 2024 -
Jalan dan jembatan 4% - 96% 17,588 Desember/December 2025 Roads and bridges
Fasilitas peremukan dan Agustus/August 2024 - Crushing and
pengolahan 1% - 99% 12,609 Desember/December 2024 handling facilities
Lain-lain 1% - 99% 3,589 Bervariasi/Various Others
Total 263,737 Total
Sesuai dengan kebijakan akuntansi Grup, manajemen In accordance with the Group’s accounting policies,
melakukan pengujian penurunan nilai atas aset non- management tests its non-financial assets (fixed
keuangan (aset tetap, properti pertambangan dan aset assets, mining properties and certain other assets)
lain-lain tertentu) bilamana terdapat kejadian atau for impairment whenever events or changes in
perubahan keadaan yang mengindikasikan bahwa nilai circumstances indicate that the carrying amount
tercatat aset tersebut tidak terpulihkan (Catatan 12 dan may not be recoverable (Notes 12 and 13). Based
13). Berdasarkan hasil penelaahan, manajemen on the assessment result, management is of the
berpendapat bahwa tidak terdapat indikasi penurunan opinion that there is no indication of impairment in
nilai aset tetap, oleh karena itu, manajemen the value of fixed assets, therefore, management
berkeyakinan bahwa cadangan kerugian penyisihan believes that the provision for impairment losses is
penurunan nilai cukup untuk menutupi adanya adequate to cover any losses from the impairment of
kerugian penurunan nilai buku aset tetap pada tanggal the carrying amounts of fixed assets as at
31 Desember 2024 dan 2023. 31 December 2024 and 2023.
Page 100
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/79 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
11. INVESTASI PADA VENTURA BERSAMA 11. INVESTMENTS IN JOINT VENTURES
2024 2023
BPI 461,725 422,285 BPI
TPI 127,068 129,846 TPI
KHN 64,497 59,251 KHN
Kestrel - 726,578 Kestrel
BEP - 63,041 BEP
DTP - 6,128 DTP
Lain-lain 226 848 Others
Total 653,516 1,407,977 Total
Dikurangi: cadangan kerugian Less: allowance for impairment
penurunan nilai atas investasi - 44,383 losses on investments
Total, neto 653,516 1,363,594 Total, net
Pada tanggal 31 Desember 2024 dan 2023, ventura As at 31 December 2024 and 2023, the joint
bersama yang dimiliki oleh Grup adalah sebagai ventures of the Group were as follows:
berikut:
Persentase
kepemilikan/
Nama entitas/ Kedudukan/ Percentage Kegiatan usaha/
Name of entity Domicile of ownership Business activity
Kestrel Australia - (2023: 47.99%) Tambang batubara kokas/Coking coal mine
BPI Indonesia 34.00% Pembangkitan tenaga listrik dan transmisi/
Electric power generation and
transmission
TPI Indonesia 65.00% Pembangkitan tenaga listrik dan transmisi/
Electric power generation and
transmission
DTP Indonesia - (2023: 49.00%) Pengolahan air/Water treatment
BEP Indonesia - (2023: 18.50%) Pengangkutan batubara/Coal transportation
KHN Indonesia 50.00% Pembangkitan listrik tenaga air/
Hydroelectric power generation
GTM Indonesia - (2023: 54.75%) Pengolahan air/Water treatment
TCU Indonesia - (2023: 49.00%) Jasa pemeliharaan fasilitas terminal/
Terminal facility maintenance services
BELL Indonesia 40.00% Investasi/Investments
Penghentian pengakuan atas investasi pada Derecognition of investments in Kestrel, DTP,
Kestrel, DTP, BEP, GTM dan TCU BEP, GTM, and TCU
Pada tanggal 31 Desember 2024, Grup sudah tidak As at 31 December 2024, the Group no longer
lagi mengakui investasi pada Kestrel, DTP, BEP, GTM, recognise its investments in Kestrel, DTP, BEP, GTM
dan TCU karena Perusahaan secara efektif telah and TCU due to the Company has effectively sold
menjual sebagian besar kepemilikan saham di Adaro mostly of its share ownership in Adaro therefore the
sehingga Perusahaan menghentikan pengakuan Grup Company has derecognised Adaro Group and
Adaro dan menyajikannya sebagai operasi yang presents it as discontinued operation. See Note 40
dihentikan. Lihat Catatan 40 untuk penyajian informasi for presentation of the Group’s financial information
keuangan terkait operasi yang dihentikan. of discontinued operations.
TPI TPI
Selama tahun 2024, Grup menerima dividen dari TPI During 2024, the Group received dividends from TPI
sebesar AS$12.025 (2023: AS$18.525). of US$12,025 (2023: US$18,525).
Page 101
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/80 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
11. INVESTASI PADA VENTURA BERSAMA (lanjutan) 11. INVESTMENTS IN JOINT VENTURES (continued)
Tabel dibawah ini menampilkan ringkasan informasi The table below provides a summary of the financial
keuangan ventura bersama Grup, dimana semuanya information of the Group’s joint ventures, all of which
tidak diperdagangkan di bursa. are unlisted.
Kestrel BPI TPI DTP BEP KHN Lain-lain/Others
2024 2023 2024 2023 2024 2023 2024 2023 2024 2023 2024 2023 2024 2023
Kas dan setara kas/
Cash and cash equivalents - 162,927 185,352 286,830 31,918 37,343 - 1,136 - 1,333 9,454 20,277 - 1,088
Aset lancar/
Current assets - 337,666 686,349 635,562 88,818 99,872 - 2,600 - 1,338 9,666 20,296 - 1,152
Aset tidak lancar/
Non-current assets - 2,027,525 4,988,080 4,975,003 424,457 446,332 - 23,817 - 82,175 99,391 73,651 - 4,230
Liabilitas keuangan jangka
pendek (tidak termasuk
utang usaha dan
lain-lain)/
Current financial
liabilities (excluding
trade payables and others) - 82,820 290,769 203,742 36,612 43,612 - 123 - 28 314 47 - 539
Liabilitas jangka pendek/
Current liabilities - 130,241 436,072 351,815 39,629 44,976 - 861 - 121 4,145 191 - 556
Liabilitas keuangan jangka
panjang (tidak termasuk
utang usaha dan
utang lain-lain)/
Non-current
financial liabilities
(excluding trade
and other payables) - 741,653 3,462,345 3,596,585 239,124 266,986 - 13,050 - 485 - - - 3,073
Liabilitas jangka panjang/
Non-current liabilities - 786,044 3,880,341 4,016,734 278,157 301,464 - 13,050 - 485 - - - 3,073
Kepentingan non-pengendali/
Non-controlling interests - - - - - - - - - (1,275) - - - -
Pendapatan/
Revenue - 1,008,416 785,893 817,751 77,773 85,137 - 4,534 - - - - - 4,535
Penyusutan dan amortisasi/
Depreciation and
amortisation - (149,691) (782) (710) (323) (154) - (4) - - (37) - - (1)
Penghasilan keuangan/
Finance income - 10,244 16,453 6,471 1,061 363 - 13 - 12 1,452 1,714 - 4
Biaya keuangan/
Finance costs - (75,216) (212,790) (216,622) (18,108) (20,290) - (951) - - (5) 1 - (89)
Laba/(rugi) sebelum
pajak penghasilan/
Profit/(loss) before
income tax - 162,420 107,078 135,164 16,498 26,796 - 2,145 - 36 (1,083) 754 - 263
(Beban)/manfaat
pajak penghasilan/
Income tax
(expense)/benefit - (45,737) (34,118) (23,648) (3,518) (5,612) - - - - - - - (81)
Laba/(rugi) tahun berjalan/
Profit/(loss) for the year - 116,683 72,960 111,516 12,980 21,184 - 2,145 - 36 (1,083) 754 - 182
Penghasilan/(kerugian)
komprehensif lain
tahun berjalan/
Other comprehensive
income/(loss) for the year - - 42,965 (19,679) 1,245 (2,380) - (180) - 149 (4,892) 1,850 - 20
Total penghasilan komprehensif
tahun berjalan,
setelah pajak/
Total comprehensive
income/(loss) for
the year, net of tax - 116,683 115,925 91,837 14,225 18,804 - 1,965 - 185 (5,975) 2,604 - 202
Persentase kepemilikan (%)/
Percentage of
ownership (%) - 47.99 34.00 34.00 65.00 65.00 - 49.00 - 18.50 50.00 50.00 40.00 40.00-54.75
Page 102
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/81 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
11. INVESTASI PADA VENTURA BERSAMA (lanjutan) 11. INVESTMENTS IN JOINT VENTURES (continued)
Rekonsiliasi dari ringkasan informasi keuangan yang The reconciliation of the summarised financial
disajikan terhadap nilai buku dari kepentingan Grup information presented to the carrying amount of the
dalam ventura bersama adalah sebagai berikut: Group’s interests in the joint ventures is as follows:
Kestrel BPI TPI DTP BEP KHN Lain-lain/Others
2024 2023 2024 2023 2024 2023 2024 2023 2024 2023 2024 2023 2024 2023
Pada awal tahun/
At the beginning
of the year 1,448,906 1,332,223 1,242,016 1,150,179 199,764 209,460 12,506 2,741 84,182 83,997 93,756 91,152 1,753 748
Penambahan/Additions - - - - - - 239 7,800 - - 16,467 - 426 803
Dividen/Dividends - - - - (18,500) (28,500) - - - - - (49) -
Laba/(rugi) tahun berjalan/
Profit/(loss) for the year 33,172 116,683 73,035 111,516 12,980 21,184 2,144 2,145 (112) 36 (1,083) 754 266 182
Penghasilan/(kerugian)
komprehensif lain
tahun berjalan
Other comprehensive
income/(loss)
for the year - - 42,965 (19,679) 1,245 (2,380) (354) (180) (210) 149 (4,892) 1,850 (60) 20
Penghentian pengakuan atas
dampak operasi yang
dihentikan/Derecognition
due to discontinued
operations (1,482,078) - - - - - (14,535) - (83,860) - - - (1,774) -
Pada akhir tahun/
At the end of the year - 1,448,906 1,358,016 1,242,016 195,489 199,764 - 12,506 - 84,182 104,248 93,756 562 1,753
Persentase kepemilikan (%)/
Percentage of
ownership (%) - 47.99 34.00 34.00 65.00 65.00 - 49.00 - 18,50 50.00 50.00 40.00 40.00-54.75
- 695,330 461,725 422,285 127,068 129,846 - 6,128 - 15,574 52,124 46,878 226 848
Properti pertambangan/
Mining properties - 19,245 - - - - - - - 47,467 - - - -
Waran/Warrants - 12,003 - - - - - - - - - - - -
Aset tetap/
Fixed assets - - - - - - - - - - 12,373 12,373 - -
Penurunan nilai/
Impairment - - - - - - - - - (44,383) - - - -
Nilai tercatat investasi pada
ventura bersama/
Carrying amount of
investments in
joint ventures - 726,578 461,725 422,285 127,068 129,846 - 6,128 - 18,658 64,497 59,251 226 848
Ventura bersama Grup merupakan perusahaan swasta The Group’s joint ventures are private companies and
tertutup dan tidak terdapat harga pasar yang dikutip there are no quoted market prices available for their
yang tersedia untuk ventura bersama tersebut. shares.
Untuk tahun-tahun yang berakhir pada tanggal For the years ended 31 December 2024 and 2023, the
31 Desember 2024 dan 2023, bagian atas penghasilan share of other comprehensive income recognised by
komprehensif lain yang diakui Grup masing-masing the Group amounted to US$12,598 and (US$7,366),
sebesar AS$12.598 dan (AS$7.366), sedangkan respectively, while the share in net profit of joint
bagian atas keuntungan neto ventura bersama yang ventures recognised by the Group amounted to
diakui Grup masing-masing sebesar AS$32.599 dan US$32,599 and US$52,059, respectively.
AS$52.059.
Grup memiliki wakil dalam Direksi dan Komisaris pada The Group has representation on the Boards of
ventura bersama di atas. Directors and Boards of Commissioners in the above
joint ventures.
Manajemen Grup berpendapat bahwa tidak terdapat The Group’s management is of the opinion that there
kejadian-kejadian atau perubahan keadaan yang are no events or changes of circumstances which
mengindikasikan adanya bukti objektif penurunan nilai indicate a permanent decline in the fair value of the
wajar investasi, sehingga tidak diperlukan cadangan investments. Therefore, no further provision for
penurunan nilai atas investasi pada ventura bersama. impairment in the value of investments in joint ventures
Pada tanggal 31 Desember 2024 dan 2023, is necessary. As at 31 December 2024 and 2023,
manajemen berpendapat bahwa cadangan kerugian management is of the opinion that the provision for
penyisihan penurunan nilai cukup untuk menutupi impairment losses was adequate to cover any losses
adanya kerugian penurunan nilai buku investasi pada from the impairment of the carrying amounts of
ventura bersama. investments in joint ventures.
Page 103
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/82 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
12. PROPERTI PERTAMBANGAN 12. MINING PROPERTIES
2024
Tambang Tambang
yang dalam
berproduksi/ pengembangan/
Mines in Mines under
production development Total
Harga perolehan Acquisition costs
Saldo awal 2,401,868 459,518 2,861,386 Beginning balance
Mutasi dari tambang
dalam pengembangan Transfer from mines under
ke tambang yang development to mines
berproduksi 29,686 (29,686) - in production
Penambahan 14,921 13,046 27,967 Additions
Penghentian pengakuan
atas dampak operasi Derecognition due to
yang dihentikan (2,203,870) (88,076) (2,291,946) discontinued operations
Saldo akhir 242,605 354,802 597,407 Ending balance
Akumulasi amortisasi Accumulated amortisation
Saldo awal (1,718,662) - (1,718,662) Beginning balance
Amortisasi (70,265) - (70,265) Amortisation
Penghentian pengakuan
atas dampak operasi Derecognition due to
yang dihentikan 1,738,639 - 1,738,639 discontinued operations
Saldo akhir (50,288) - (50,288) Ending balance
Penyisihan atas kerugian
penurunan nilai (81,199) (66,972) (148,171) Provision for impairment losses
Penghentian pengakuan
atas dampak operasi Derecognition due to
yang dihentikan 81,199 66,972 148,171 discontinued operations
Saldo akhir - - - Ending balance
Total nilai tercatat 192,317 354,802 547,119 Total carrying amount
2023
Tambang Tambang
yang dalam
berproduksi/ pengembangan/
Mines in Mines under
production development Total
Harga perolehan Acquisition costs
Saldo awal 2,391,501 449,506 2,841,007 Beginning balance
Penambahan 10,367 10,012 20,379 Additions
Saldo akhir 2,401,868 459,518 2,861,386 Ending balance
Akumulasi amortisasi Accumulated amortisation
Saldo awal (1,659,578) - (1,659,578) Beginning balance
Amortisasi (59,084) - (59,084) Amortisation
Saldo akhir (1,718,662) - (1,718,662) Ending balance
Penyisihan atas kerugian
penurunan nilai (81,199) (66,972) (148,171) Provision for impairment losses
Total nilai tercatat 602,007 392,546 994,553 Total carrying amount
Seluruh amortisasi properti pertambangan All amortisation of mining properties was allocated to
dialokasikan ke beban pokok pendapatan. cost of revenue.
Pada tanggal 31 Desember 2024 dan 2023, As at 31 December 2024 and 2023, management is
manajemen berpendapat bahwa tidak ada indikasi of the opinion that there are no indicators of
penurunan nilai dan cadangan kerugian penyisihan impairment, and the provision for impairment losses
penurunan nilai properti pertambangan cukup untuk is adequate to cover any potential losses from
menutupi kerugian penurunan nilai properti impairment of the carrying amounts of mining
pertambangan. properties.
Page 104
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/83 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
13. GOODWILL 13. GOODWILL
2024 2023
Nilai tercatat 39,665 776,943 Carrying amount
Rincian goodwill berdasarkan lini usaha, sebagai Details of goodwill based on lines of business, are as
berikut: follows:
Pertambangan
dan
perdagangan Jasa
batubara/Coal pertambangan/
mining and Mining Logistik/
trading services Logistics Total
31 Desember/December 2024 - 39,665 - 39,665
31 Desember/December 2023 658,947 39,665 78,331 776,943
Sesuai dengan kebijakan akuntansi Grup, goodwill In accordance with the Group’s accounting policy,
diuji penurunan nilainya secara tahunan di akhir tahun goodwill is tested for impairment annually at the end
dan/atau ketika terdapat suatu indikasi bahwa nilai of the year and/or when the circumstances indicate
tercatatnya mengalami penurunan nilai (Catatan 2m). the carrying amount may be impaired (Note 2m). For
Untuk tujuan pengujian penurunan nilai, aset the purpose of assessing impairment, assets are
dikelompokkan hingga unit terkecil yang menghasilkan grouped at the lowest level for which there are
arus kas terpisah (UPK). Pada 2024, Grup separately identifiable cash flows (CGU). On 2024,
menghentikan pengakuan goodwill pada lini usaha the Group derecognise goodwill in coal mining, coal
pertambangan, perdagangan batubara dan logistik trading and logistics lines of business due to sale of
akibat penjualan Adaro. Adaro.
Asumsi utama yang digunakan dalam perhitungan The key assumptions used for recoverable amount
jumlah terpulihkan pada tanggal 31 Desember 2024 calculations as at 31 December 2024 were as
adalah sebagai berikut: follows:
Jasa
pertambangan/
Mining services
Tingkat pertumbuhan setelah lima
tahun/Growth rate after five years 0%
Tingkat diskonto setelah pajak (untuk
perhitungan nilai wajar setelah
dikurangi biaya untuk menjual)/
Post-tax discount rate (for fair value
less costs of disposal calculation) 10.0%
Asumsi utama yang digunakan dalam perhitungan The key assumptions used for recoverable amount
jumlah terpulihkan pada tanggal 31 Desember 2023 calculations as at 31 December 2023 were as
adalah sebagai berikut: follows:
Pertambangan dan Jasa
perdagangan batubara/ pertambangan/ Logistik/
Coal mining and trading Mining services Logistics
Tingkat pertumbuhan setelah lima
tahun/Growth rate after five years 0% 0% 0%
Tingkat diskonto setelah pajak (untuk
perhitungan nilai wajar setelah
dikurangi biaya untuk menjual)/
Post-tax discount rate (for fair value
less costs of disposal calculation) 9.5% - 10.0% 10.0% 9.0%
Perhitungan ini menggunakan proyeksi arus kas These calculations use cash flow projections based
berdasarkan anggaran keuangan yang disetujui oleh on financial budgets approved by the management.
manajemen. Asumsi utama yang lain termasuk Other key assumptions include projected cash flows,
proyeksi arus kas, harga batubara, estimasi cadangan coal price, estimated coal reserves, inflation rate,
batubara, tingkat inflasi, tingkat penjualan dan produksi sales and production levels and cost structures.
dan struktur biaya.
Page 105
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/84 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
13. GOODWILL (lanjutan) 13. GOODWILL (continued)
Manajemen menentukan asumsi utama berdasarkan Management determined the key assumptions
kombinasi pengalaman masa lalu dan sumber based on a combination of past experience and
eksternal. external sources.
Pada tanggal 31 Desember 2024 dan 2023, jumlah As at 31 December 2024 and 2023, the recoverable
terpulihkan dari setiap UPK ditentukan berdasarkan amount of the CGUs was determined based on fair
perhitungan nilai wajar aset dikurangi biaya pelepasan value less cost of disposal calculations which
yang membutuhkan penggunaan asumsi-asumsi. requires the use of assumptions. The valuation
Teknik penilaian menggunakan input-input yang technique uses significant unobservable inputs,
signifikan yang tidak dapat diobservasi, yang which represent a Level 3 fair value.
merupakan nilai wajar Tingkat 3.
Pada tanggal 31 Desember 2023, perusahaan As at 31 December 2023, the Group’s coal trading
perdagangan batubara Grup memiliki tingkat company had the highest sensitivity to changes in
sensitivitas tertinggi atas perubahan asumsi utama. key assumptions. The CGU had an excess
UPK tersebut memiliki kelebihan jumlah terpulihkan, recoverable amount, calculated based on the fair
dihitung berdasarkan nilai wajar setelah dikurangi value less costs of disposal method, over the
biaya untuk menjual, dari nilai tercatat, sebesar carrying amount of US$269,317. A rise in the
AS$269.317. Kenaikan tingkat diskonto (dengan discount rate (with other assumptions remaining
asumsi lainnya tidak berubah) sebesar 5,68% akan unchanged) of 5.68% would remove the remaining
menghapus kelebihan yang tersisa dari UPK tersebut. headroom for the relevant CGU.
Pada tanggal 31 Desember 2024 dan 2023, As at 31 December 2024 and 2023, the Group’s
manajemen Grup berpendapat bahwa tidak ada management was of the opinion that there were no
kejadian atau perubahan keadaan yang dimana akan events or changes in circumstances which would
mengindikasikan penurunan nilai pada saldo goodwill. indicate impairment in the balance of goodwill.
14. PINJAMAN UNTUK PIHAK KETIGA 14. LOANS TO THIRD PARTIES
2024 2023
PT Kalimantan Industrial Park
Indonesia (“KIPI”) PT Kalimantan Industrial Park
(Catatan 41x) 145,927 145,964 Indonesia (“KIPI”) (Note 41x)
PT Persada Sentral Mineral PT Persada Sentral Mineral
(“PSM”) (Catatan 41aa) 32,588 24,435 (“PSM”) (Note 41aa)
PT Kawasan Industri Kalimantan
Indonesia (“KIKI”) PT Kawasan Industri Kalimantan
(Catatan 41w) 7,298 14,748 Indonesia (“KIKI”) (Note 41w)
Lain-lain 1,308 11,942 Others
Total 187,121 197,089 Total
Dikurangi: cadangan kerugian (3,255) - Less: loss allowance
Total 183,866 197,089 Total
Dikurangi: bagian lancar 31,228 26,356 Less: current portion
Bagian tidak lancar 152,638 170,733 Non-current portion
Manajemen berkeyakinan bahwa cadangan yang Management believes the established allowance is
dibentuk cukup untuk menutupi penurunan nilai dari adequate to cover the impairment of loans to third
pinjaman untuk pihak ketiga. parties.
Lihat Catatan 44(2) untuk informasi nilai wajar dari Refer to Note 44(2) for information on the fair value
pinjaman untuk pihak ketiga pada tanggal of loans to third parties as at 31 December 2024 and
31 Desember 2024 dan 2023. 2023.
Page 106
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/85 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
15. UTANG USAHA 15. TRADE PAYABLES
2024 2023
Pihak ketiga 134,208 344,743 Third parties
Pihak berelasi 24,152 - Related parties
Total 158,360 344,743 Total
Saldo utang usaha terutama berasal dari pembelian Trade payables balances mainly arise from the
bahan bakar, suku cadang, jasa perbaikan dan purchase of fuel, spare parts, repair and
pemeliharaan, jasa pengangkutan batubara, dan jasa maintenance services, coal transportation services
pertambangan batubara. and coal mining services.
Rincian utang usaha berdasarkan mata uang adalah Details of trade payables based on currencies are as
sebagai berikut: follows:
2024 2023
Rupiah 128,949 331,144 Rupiah
Dolar AS 29,224 13,583 US Dollars
Lain-lain 187 16 Others
Total 158,360 344,743 Total
16. UTANG ROYALTI 16. ROYALTIES PAYABLE
2024 2023
Utang royalti kepada
Pemerintah, neto 22,232 26,988 Government royalties payable, net
Utang royalti kepada Pemerintah merupakan subyek Government royalties payable are subject to audit by
audit oleh Direktorat Pembinaan Pengusahaan Mineral the Directorate of Mineral and Coal Business
dan Batubara, KESDM. Supervision, the MoEMR.
17. BEBAN YANG MASIH HARUS DIBAYAR 17. ACCRUED EXPENSES
2024 2023
Pemasok dan kontraktor 107,244 130,889 Suppliers and contractors
Bunga 12,504 16,577 Interest
Cadangan untuk pembayaran
penetapan Pemerintah Allowance for Government charges
(Catatan 41l) 8,904 8,508 (Note 41l)
PNBP dan pendapatan
pemerintah daerah PNBP and regional government
(Catatan 41n) - 80,307 revenue (Note 41n)
Lain-lain 23,016 21,694 Others
Total 151,668 257,975 Total
Page 107
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/86 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
18. LIABILITAS SEWA 18. LEASE LIABILITIES
2024 2023
PT Komatsu Astra Finance 77,356 84,316 PT Komatsu Astra Finance
PT Mitsui Leasing Capital PT Mitsui Leasing Capital
Indonesia 8,259 11,475 Indonesia
PT Verena Multi Finance Tbk - 321 PT Verena Multi Finance Tbk
Lain-lain 31,892 15,799 Others
Total 117,507 111,911 Total
Dikurangi: Less:
Bagian jangka pendek 29,057 28,794 Current portion
Bagian jangka panjang 88,450 83,117 Non-current portion
Grup menandatangani beberapa perjanjian sewa yang The Group entered into several lease agreements
berkaitan dengan sewa gedung, mesin, peralatan related to the rental of buildings, machineries,
operasional, dan kendaraan. Perjanjian sewa biasanya operational equipment and vehicles. Rental
memiliki periode tetap dari satu sampai dengan agreements are typically made for fixed periods of
sembilan belas tahun. Ketentuan sewa dinegosiasikan one to nineteen years. Lease terms are negotiated
secara individu dan mengandung syarat dan ketentuan on an individual basis and contain a wide range of
yang berbeda. different terms and conditions.
Laporan laba rugi dan penghasilan komprehensif lain The Group’s consolidated statements of profit or
konsolidasian Grup menyajikan saldo berikut berkaitan loss and other comprehensive income show the
dengan sewa: following amounts related to leases:
2024 2023
Beban terkait sewa jangka
pendek (disajikan sebagai Expenses relating to short-term leases
bagian dari beban pokok (presented as part of cost of
pendapatan dan beban usaha) 28,844 44,414 revenue and operating expenses)
Beban terkait pembayaran sewa Expenses relating to variable lease
variabel tidak termasuk dalam payments not included in
kewajiban sewa 2,692 2,152 lease liabilities
Beban bunga (disajikan sebagai Interest expense (presented as
bagian dari biaya keuangan) 7,712 6,011 part of finance costs)
Beban terkait sewa aset
bernilai rendah yang
bukan merupakan sewa Expenses relating to leases of
jangka pendek (disajikan low-value assets that are not
sebagai bagian dari beban short-term leases (presented as
pokok pendapatan dan part of cost of revenue and
beban usaha) 426 443 operating expenses)
Jumlah pengeluaran kas untuk sewa selama tahun The total cash outflow for leases for the years
yang berakhir pada tanggal 31 Desember 2024 dan ended 31 December 2024 and 2023 was
2023 masing-masing adalah sebesar AS$176.017 dan US$176,017 and US$207,250, respectively.
AS$207.250.
Page 108
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/87 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK 19. BANK LOANS
2024 2023
Perjanjian Fasilitas AS$981.400 dan
Rp1.547.900.000.000, US$981,400 and Rp1,547,900,000,000
setelah dikurangi biaya Facility Agreement,
keuangan yang belum net of unamortised financing
diamortisasi sebesar AS$3.105 cost of US$3,105
(2023: AS$1.034) 295,769 98,725 (2023: US$1,034)
Perjanjian Fasilitas Rp1,800,000,000,000
Rp1.800.000.000.000 106,583 - Facility Agreement
Perjanjian Fasilitas AS$80.000,
setelah dikurangi keuntungan
atas modifikasi utang sebesar US$80,000 Facility Agreement,
sebesar AS$1.438 net of loan modification
(2023: setelah dikurangi gain of US$1,438
biaya keuangan (2023: net of
yang belum diamortisasi unamortised financing
sebesar AS$547) 44,162 57,453 cost of US$547)
Perjanjian Fasilitas AS$350.000,
setelah dikurangi biaya
keuangan yang belum
diamortisasi sebesar AS$3.430 US$350,000 Facility Agreement,
dan keuntungan atas modifikasi net of unamortised financing
utang sebesar AS$744 cost of US$3,430 and loan
(2023: setelah dikurangi biaya modification gain of US$744)
keuangan yang belum (2023: net of unamortised
diamortisasi sebesar AS$7.237) 15,824 170,763 financing cost of US$7,237)
Perjanjian Fasilitas AS$120.000,
setelah dikurangi biaya US$120,000 Facility Agreement,
keuangan yang belum net of unamortised financing
diamortisasi sebesar AS$nihil cost of US$nil
(2023: AS$244) - 119,756 (2023: US$244)
Perjanjian Fasilitas AS$400.000,
setelah dikurangi biaya US$400,000 Facility Agreement,
keuangan yang belum net of unamortised financing
diamortisasi sebesar AS$nihil cost of US$nil
(2023: AS$978) - 83,022 (2023: US$978)
Perjanjian Fasilitas AS$603.600 dan
Rp952.100.000.000, US$603,600 and Rp952,100,000,000
setelah dikurangi biaya Facility Agreement,
keuangan yang belum net of unamortised financing
diamortisasi sebesar AS$nihil cost of US$nil
(2023: AS$616) - 49,319 (2023: US$616)
Perjanjian Fasilitas AS$40.000 - 40,000 US$40,000 Facility Agreement
Perjanjian Pinjaman Properti Commercial Property Loan
Komersial - 7,203 Agreement,
Perjanjian Kredit
Rp144.770.529.123,
setelah dikurangi biaya Rp144,770,529,123 Credit Agreement,
keuangan yang belum net of unamortised financing
diamortisasi sebesar AS$nihil cost of US$nil
(2023: AS$16) - 902 (2023: US$16)
Total 462,338 627,143 Total
Dikurangi: Less:
Bagian jangka pendek 29,682 222,782 Current portion
Bagian jangka panjang 432,656 404,361 Non-current portion
Page 109
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/88 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
Tingkat suku bunga utang bank jangka panjang The interest rates on the long-term bank loans were
tersebut adalah sebagai berikut: as follows:
2024 2023
Dolar AS 4.8% - 8.4% 4.2% - 8.6% US Dollars
Dolar Singapura 5.0% - 5.4% 3.8% - 5.1% Singapore Dollars
Rupiah 6.9% - 9.1% 8.5% - 8.8% Indonesia Rupiah
a. Perjanjian Fasilitas AS$981.400 dan a. US$981,400 and Rp1,547,900,000,000
Rp1.547.900.000.000 Facility Agreement
Pada 12 Mei 2023, KAI menandatangani On 12 May 2023, KAI entered into a Facility
Perjanjian Fasilitas dengan sindikasi bank Agreement with a syndicate of national banks
nasional yang mana Bank Mandiri bertindak for which Bank Mandiri acts as the facility
sebagai agen fasilitas (“Fasilitas Pinjaman agent (“KAI’s Loan Facility”).
KAI”).
Fasilitas Pinjaman KAI terdiri dari fasilitas KAI’s Loan Facility consists of term loan
pinjaman berjangka dalam mata uang: (i) Dolar facilities made available in: (i) US Dollars, with
AS, dengan total komitmen sebesar a total commitment of US$981,400 and an
AS$981.400 dan tingkat suku bunga tahunan annual interest rate of SOFR plus a certain
sebesar SOFR ditambah persentase tertentu percentage (“KAI’s Tranche A Loan Facility”);
(“Fasilitas Pinjaman KAI Tranche A”); serta (ii) and (ii) Rupiah, with a total commitment of
Rupiah, dengan total komitmen sebesar Rp1,547,900,000,000 (full amount) and an
Rp1.547.900.000.000 (nilai penuh) dan tingkat annual interest rate of Jakarta Interbank
suku bunga tahunan sebesar Jakarta Offered Rate (“JIBOR”) plus a certain
Interbank Offered Rate (“JIBOR”) ditambah percentage (“KAI’s Tranche B Loan Facility”).
persentase tertentu ("Fasilitas Pinjaman KAI KAI’s Loan Facility will mature no later than 8
Tranche B”). Fasilitas Pinjaman KAI ini akan (eight) years from the date of the signing of
jatuh tempo paling lama 8 (delapan) tahun KAI’s Loan Facility.
sejak tanggal penandatanganan Fasilitas
Pinjaman KAI.
Fasilitas Pinjaman KAI akan digunakan antara KAI’s Loan Facility will be used for the purpose
lain untuk tujuan pembiayaan pengembangan of, among others, financing the development
proyek smelter aluminium dan fasilitas of an aluminium smelter project and its
pendukungnya milik KAI yang berlokasi di ancillary facilities owned by KAI, located in the
kawasan industri KIPI di Kalimantan Utara, industrial area of KIPI in North Kalimantan,
Indonesia. Indonesia.
Terkait dengan fasilitas pinjaman KAI, (i) AIA In relation to KAI’s Loan Facility, (i) AIA has
telah memberikan jaminan gadai atas saham pledged its shares in KAI, (ii) KAI has pledged
miliknya di KAI, (ii) KAI telah memberikan its bank accounts and provided fiduciary
jaminan berupa jaminan gadai atas rekening security over its material fixed assets, and will
bank dan telah memberikan jaminan fidusia provide fiduciary security over its receivables
atas aset tetap material milik KAI, serta KAI and mortgages over land located in KAI’s
akan memberikan jaminan fidusia atas piutang project area and (iii) the Company has
yang diterima oleh KAI dan hak tanggungan provided corporate guarantees in proportion to
atas tanah yang berlokasi di area proyek KAI AIA's ownership in KAI.
dan (iii) Perusahaan telah memberikan
jaminan perusahaan sesuai dengan
kepemilikan AIA di KAI.
Selama tahun 2024, KAI melakukan penarikan During 2024, KAI made drawdowns of
penarikan sebesar AS$181.800 atas Fasilitas US$181,800 on KAI’s Tranche A and
Pinjaman KAI Tranche A dan Rp286,742,000,000 (full amount) equivalent to
Rp286.742.000.000 (nilai penuh) (setara US$18,178) on KAI’s Tranche B Loan Facility
dengan AS$18.178) atas Fasilitas Pinjaman (2023: drawdowns of US$90,500 on KAI’s
KAI Tranche B (2023: penarikan sebesar Tranche A Loan Facility and
AS$90.500 atas Fasilitas Pinjaman KAI Rp142,740,000,000 (full amount) (equivalent
Tranche A dan Rp142.740.000.000 (nilai to US$9,508) on KAI’s Tranche B Loan
penuh) (setara dengan AS$9.508) atas Facility). During 2024, KAI did not make any
Fasilitas Pinjaman KAI Tranche B). Selama repayments on KAI’s Tranche A and Tranche
tahun 2024, KAI tidak melakukan pembayaran B Loan Facility.
atas Fasilitas Pinjaman KAI Tranche A
maupun Fasilitas Pinjaman KAI Tranche B.
Page 110
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/89 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
a. Perjanjian Fasilitas AS$981.400 dan a. US$981,400 and Rp1,547,900,000,000
Rp1.547.900.000.000 (lanjutan) Facility Agreement (continued)
Pada tanggal 31 Desember 2024, saldo As at 31 December 2024, the outstanding
pinjaman yang terutang dari Fasilitas balances on these KAI’s Loan Facilities were
Pinjaman KAI ini adalah masing-masing US$272,300,000 and Rp429,482,000,000
sebesar AS$272.300.000 dan Rp (full amount) (equivalent to US$26,574)
429.482.000.000 (nilai penuh) (setara dengan (31 December 2023: US$90,500 and
AS$26.574) (31 Desember 2023: AS$90.500 Rp142,740,000,000 (full amount) (equivalent
dan Rp142.740.000.000 (nilai penuh) (setara to US$9,259)), respectively which are
dengan AS$9.259)) dan harus dibayarkan repayable according to the following schedule:
kembali dengan jadwal pembayaran sebagai
berikut:
Jadwal pembayaran kembali/ Jumlah pembayaran
Repayment schedule kembali/
(tahun/year) Repayment amount
2026 11,713
2027 45,627
2028 57,445
2029 61,893
2030 66,751
2031 55,445
Total 298,874
Sesuai dengan ketentuan dalam Fasilitas In accordance with KAI’s Loan Facility, KAI is
Pinjaman KAI, KAI diwajibkan untuk required to fulfil financial covenants including
memenuhi kewajiban keuangan termasuk to comply with the terms and conditions stated
mematuhi syarat dan ketentuan yang in KAI’s Loan Facility. As at 31 December 2024
tercantum dalam Fasilitas Pinjaman KAI. Pada and 2023, KAI had complied with the financial
tanggal 31 Desember 2024 dan 2023, KAI ratios and related terms and conditions.
telah memenuhi rasio keuangan dan
persyaratan dan ketentuan tersebut.
b. Perjanjian Fasilitas Rp1.800.000.000.000 b. Rp1,800,000,000,000 Facility Agreement
Pada tanggal 22 Juli 2024, SIS mengadakan On 22 July 2024, SIS entered into a
Perjanjian Pinjaman Sindikasi sebesar Syndicated Loan Agreement of
Rp1.800.000.000.000 (nilai penuh) Rp1,800,000,000,000 (full amount)
(“Perjanjian Pinjaman Sindikasi”) dengan (“Syndicated Loan Agreement”) with a
sindikasi bank yang di mana Bank Mandiri syndicate of banks, for which Bank Mandiri
bertindak sebagai agen fasilitas. Perusahaan acts as the facility agent. The Company acts
bertindak sebagai penjamin atas fasilitas as the guarantor of this loan facility. This loan
pinjaman ini. Fasilitas pinjaman ini merupakan facility is an amortising term loan facility and
fasilitas pinjaman amortisasi berjangka dan will be due in 3 years from the date of the
akan jatuh tempo 3 tahun sejak tanggal Syndicated Loan Agreement. The amortising
Perjanjian Pinjaman Sindikasi. Fasilitas term loan facility is repayable on a quarterly
pinjaman amortisasi berjangka ini dibayarkan basis with the first installment due in October
setiap kuartal dengan angsuran pertama pada 2024. This facility bears a fixed interest rate
bulan Oktober 2024. Fasilitas ini dikenakan and is not bound by any collateral.
suku bunga tetap dan tidak diikat dengan
jaminan apapun.
Fasilitas pinjaman ini akan digunakan untuk This loan facility will be used to repay all the
membayar kembali semua jumlah terutang amount due under the term loan facility that
atas fasilitas pinjaman berjangka yang harus must be repaid under the US$350,000 Facility
dibayarkan berdasarkan Perjanjian Fasilitas Agreement (Note 19d), finance SIS’ other
AS$350.000 (Catatan 19d), membiayai general corporate purposes, and pay
keperluan SIS secara umum lainnya, dan transaction costs and expenses related to
membayar biaya transaksi dan pengeluaran Syndicated Loan Agreement.
terkait Perjanjian Pinjaman Sindikasi.
Page 111
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/90 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
b. Perjanjian Fasilitas Rp1.800.000.000.000 b. Rp1,800,000,000,000 Facility Agreement
(lanjutan) (continued)
Pada tanggal 26 Juli 2024, SIS telah On 26 July 2024, SIS has made full drawdown
melakukan penarikan penuh pada fasilitas on the amortising term loan facility.
pinjaman amortisasi berjangka tersebut.
Selama tahun 2024, SIS melakukan During 2024, SIS made instalment payment of
pembayaran cicilan sebesar Rp77,400,000,000 (full amount) (equivalent to
Rp77.400.000.000 (nilai penuh) (setara US$4,786). As at 31 December 2024, the
dengan AS$4.786). Pada tanggal outstanding balance of this loan facility was
31 Desember 2024, saldo pinjaman yang Rp1,722,600,000,000 (full amount)
terutang dari fasilitas pinjaman ini adalah (equivalent to US$106,583) which is repayable
sebesar Rp1.722.600.000.000 (nilai penuh) according to the following schedule:
(setara dengan AS$106.583) dan harus
dibayarkan dengan jadwal pembayaran
sebagai berikut:
Jadwal pembayaran kembali/ Jumlah pembayaran
Repayment schedule kembali/
(tahun/year) Repayment amount
2025 19,156
2026 40,094
2027 47,333
Total 106,583
Sesuai dengan ketentuan dalam Perjanjian In accordance with the Syndicated Loan
Pinjaman Sindikasi, SIS diharuskan untuk Agreement, SIS is required to maintain certain
menjaga beberapa rasio keuangan tertentu. financial ratios. SIS is also required to comply
SIS juga diharuskan untuk memenuhi with certain terms and conditions with regard
beberapa persyaratan dan ketentuan to its Articles of Association, the nature of the
mengenai Anggaran Dasar, kegiatan usaha, business, corporate actions, financing
aksi korporasi, kegiatan pembiayaan dan activities and other matters.
lainnya.
c. Perjanjian Fasilitas AS$80.000 c. US$80,000 Facility Agreement
Pada tanggal 6 Mei 2021, MSW mengadakan On 6 May 2021, MSW entered into a Credit
Perjanjian Fasilitas Kredit sebesar AS$80.000 Facility Agreement of US$80,000 with a
dengan sindikasi bank nasional yang mana syndicate of national banks for which Bank
Bank Mandiri bertindak sebagai agen fasilitas. Mandiri acts as the facility agent. The
Perusahaan bertindak sebagai penjamin atas Company acts as the guarantor of this term
fasilitas pinjaman berjangka ini. loan facility.
Fasilitas pinjaman ini digunakan untuk This loan facility was used for repayment of the
membayar kembali jumlah pinjaman yang loan obtained from the Company, for paying
diperoleh dari Perusahaan, membayar biaya transaction costs and expenses associated
transaksi dan biaya lain yang berhubungan with the facility, payments of one-time
dengan perjanjian fasilitas ini, pembayaran permitted dividends distribution to
atas distribusi dividen yang diperbolehkan satu shareholders and to ensure the availability of
kali terhadap pemegang saham serta an adequate DSRA balance in PT Bank
memastikan tersedianya saldo DSRA yang Permata Tbk (Note 5).
memadai di PT Bank Permata Tbk (Catatan 5).
Pada tanggal 20 Juni 2023, MSW On 20 June 2023, MSW signed an amended
menandatangani perjanjian yang diubah dan and restated agreement to the US$80,000
dinyatakan kembali terkait Perjanjian Fasilitas Facility Agreement to change the interest rate
AS$80.000 untuk mengubah suku bunga dari from LIBOR to SOFR and changes to the
LIBOR menjadi SOFR dan perubahan covenants.
kovenan.
Page 112
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/91 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
c. Perjanjian Fasilitas AS$80.000 (lanjutan) c. US$80,000 Facility Agreement (continued)
Fasilitas ini akan jatuh tempo pada tanggal This facility has a final maturity date of 6 May
6 Mei 2028. Fasilitas ini tidak diikat dengan 2028. This facility is not bound by any
jaminan apapun. collateral.
Pada tanggal 22 Desember 2023, MSW On 22 December 2023, MSW signed
menandatangani Adendum I atas Perjanjian Addendum I to the Amended and Restated
Perubahan dan Pernyataan Kembali tanggal agreement dated 20 June 2023 to the
20 Juni 2023 terkait Perjanjian Fasilitas US$80,000 Facility Agreement to reduce the
AS$80.000 untuk melakukan penurunan fixed margin of the interest. The changes are
marjin tetap atas suku bunga. Perubahan ini considered as loan modifications, thus, MSW
dianggap sebagai modifikasi utang, sehingga, recognised gain amounting to $1,719, which is
MSW mengakui keuntungan sebesar $1.719, recognised in the consolidated statements of
pada laporan laba rugi konsolidasian untuk profit or loss for 2024.
tahun 2024.
Selama tahun 2024, MSW telah melakukan During 2024, MSW made instalment payments
pembayaran cicilan sebesar AS$12.400 amounting to US$12,400 (2023: US$11,800).
(2023: AS$5.800). Pada tanggal 31 Desember As at 31 December 2024, the outstanding
2024, saldo pinjaman yang terutang dari balance of this loan facility was US$45,600
fasilitas pinjaman ini adalah sebesar (2023: US$58,000) and is repayable according
AS$45.600 (2023: AS$58.000) dan harus to the following schedule:
dibayarkan kembali dengan jadwal
pembayaran sebagai berikut:
Jadwal pembayaran kembali/ Jumlah pembayaran
Repayment schedule kembali/
(tahun/year) Repayment amount
2025 12,800
2026 13,200
2027 11,400
2028 8,200
Total 45,600
Sesuai dengan ketentuan dalam perjanjian In accordance with the loan agreement, MSW
pinjaman, MSW diharuskan untuk menjaga is required to maintain certain financial ratios.
beberapa rasio keuangan tertentu. MSW juga MSW is also required to comply with certain
diharuskan untuk memenuhi beberapa terms and conditions with regard to certain
persyaratan dan ketentuan mengenai hal-hal matters regulated in its Articles of Association,
tertentu yang diatur dalam Anggaran Dasar, as well as in implementing its line of business,
serta dalam melaksanakan kegiatan usaha, corporate actions, financing activities and
aksi korporasi, kegiatan pembiayaan dan other matters. As at 31 December 2024 and
lainnya. Pada tanggal 31 Desember 2024 dan 2023, MSW is in compliance with the financial
2023, MSW telah memenuhi rasio keuangan ratios and related terms and conditions.
dan persyaratan dan ketentuan tersebut.
d. Perjanjian Fasilitas AS$350.000 d. US$350,000 Facility Agreement
Pada tanggal 29 Juli 2022, SIS mengadakan On 29 July 2022, SIS entered into a Facility
Perjanjian Fasilitas sebesar AS$350.000 Agreement of US$350,000 (“Facility
(“Perjanjian Fasilitas”) dengan sindikasi bank Agreement”) with a syndicate of banks, for
yang mana Bank Mandiri bertindak sebagai which Bank Mandiri acts as the facility agent.
agen fasilitas. Perusahaan bertindak sebagai The Company acts as the guarantor of this
penjamin atas fasilitas pinjaman ini. Fasilitas loan facility. This loan facility consists of a term
pinjaman ini terdiri dari fasilitas pinjaman loan facility of US$150,000 and a
berjangka sebesar AS$150.000 dan fasilitas revolving loan facility of US$200,000 and both
pinjaman revolving sebesar AS$200.000 dan facilities will be due in 60 months from the date
kedua fasilitas tersebut memiliki jatuh tempo of the Facilities Agreement. The term loan
60 bulan sejak tanggal Perjanjian Fasilitas. facility is repayable in installments on a
Fasilitas pinjaman berjangka ini dibayarkan quarterly basis with the first instalment due in
cicilan setiap kuartal dengan angsuran January 2023. This facility bears interest at
pertama pada bulan Januari 2023. Fasilitas ini SOFR plus a certain percentage. This facility
dikenakan suku bunga sebesar SOFR is not bound by any collateral.
ditambah persentase tertentu. Fasilitas ini
tidak diikat dengan jaminan apapun.
Page 113
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/92 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
d. Perjanjian Fasilitas AS$350.000 (lanjutan) d. US$350,000 Facility Agreement (continued)
Marjin untuk fasilitas pinjaman revolving telah The margin for the revolving loan facility has
mengalami penurunan berlaku efektif sejak been reduced effective since 16 August 2024.
tanggal 16 Agustus 2024.
Fasilitas pinjaman ini digunakan untuk This loan facility was used for loan refinancing
membiayai kembali semua pinjaman yang to repay all outstanding loans due under the
terutang berdasarkan perjanjian fasilitas previous facility agreement, transaction costs
sebelumnya, membayar biaya transaksi dan and other expenses related to these facilities,
biaya lain yang berhubungan dengan fasilitas other capital expenditures and general
ini, pengeluaran modal dan keperluan corporate purposes.
korporasi umum lainnya.
Pada tanggal 29 Juli 2024, SIS telah On 29 July 2024, SIS has fully repaid loan on
melakukan pelunasan atas seluruh fasilitas the term loan facility, thus, the outstanding
pinjaman berjangka sehingga saldo pinjaman balance of this loan facility is US$nil as at
terutang atas fasilitas per 31 Desember 2024 31 December 2024 (2023: US$120,000).
adalah sebesar AS$nihil (2023: AS$120.000).
Selama tahun 2024, SIS melakukan penarikan During 2024, SIS has made drawdowns of
sebesar AS$220.000 dan pembayaran US$220,000 and repayments of US$258,000
sebesar AS$258.000 atas fasilitas pinjaman on the revolving loan facility (2023: drawdowns
revolving (2023: penarikan sebesar of US$60,000 and repayments of US$74,000).
AS$60.000 dan pembayaran sebesar As at 31 December 2024, the outstanding
AS$74.000). Pada tanggal 31 Desember balance of this loan facility was US$20,000
2024, saldo pinjaman yang terutang dari (2023: US$58,000).
fasilitas pinjaman ini adalah sebesar
AS$20.000 (2023: AS$58.000).
Sesuai dengan ketentuan dalam Perjanjian In accordance with the Facilities Agreement,
Fasilitas, SIS diharuskan untuk menjaga SIS is required to maintain certain financial
beberapa rasio keuangan tertentu. SIS juga ratios. SIS is also required to comply with
diharuskan untuk memenuhi beberapa certain terms and conditions with regard to its
persyaratan dan ketentuan mengenai Articles of Association, the nature of the
Anggaran Dasar, kegiatan usaha, aksi business, corporate actions, financing
korporasi, kegiatan pembiayaan dan lainnya. activities and other matters. As at 31
Pada tanggal 31 Desember 2024 dan 2023, December 2024 and 2023, SIS is in
SIS telah memenuhi rasio keuangan dan compliance with the financial ratios and related
persyaratan dan ketentuan tersebut. terms and conditions
e. Perjanjian Fasilitas AS$120.000 e. US$120,000 Facility Agreement
Pada tanggal 18 Mei 2021, AP mengadakan On 18 May 2021, AP entered into a Credit
Perjanjian Fasilitas Kredit sebesar Facility Agreement of US$120,000 with a
AS$120.000 dengan sindikasi bank, yang syndicate of banks for which Sumitomo Mitsui
mana Sumitomo Mitsui Banking Corporation, Banking Corporation, Singapore Branch, acts
Cabang Singapura, bertindak sebagai agen as the facility agent. The Company acts as the
fasilitas. Perusahaan bertindak sebagai guarantor of this term loan facility.
penjamin atas fasilitas pinjaman berjangka ini.
Fasilitas pinjaman ini digunakan untuk This loan facility was used for repaying part of
pembayaran kembali sebagian dari porsi the portion of BPI’s loan facility under the
fasilitas pinjaman BPI berdasarkan Perjanjian US$817,027 Subordinated Term Loan Facility
Subordinated Term Loan Facility AS$817.027 Agreement guaranteed by the Company and
yang dijamin oleh Perusahaan, serta paying transaction costs and expenses
membayar biaya transaksi dan biaya lain yang associated with the facility. This facility shall be
berhubungan dengan fasilitas ini. Fasilitas ini repaid in full on the final maturity date of 18
harus dibayar kembali secara penuh pada May 2024.
tanggal jatuh tempo yaitu 18 Mei 2024.
Page 114
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/93 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
e. Perjanjian Fasilitas AS$120.000 (lanjutan) e. US$120,000 Facility Agreement (continued)
Pada tanggal 3 Juli 2023, AP menandatangani On 3 July 2023, AP signed an amended and
perjanjian yang diubah dan dinyatakan restated agreement to the US$120,000 Facility
kembali terkait Perjanjian Fasilitas Agreement to change the interest rate from
AS$120.000 untuk mengubah suku bunga dari LIBOR to SOFR. This facility bears interest at
LIBOR menjadi SOFR. Fasilitas ini dikenakan SOFR plus a certain percentage. This facility
bunga sebesar SOFR ditambah persentase is not bound by any collateral.
tertentu. Fasilitas ini tidak diikat dengan
jaminan apapun.
AP telah melakukan pelunasan atas fasilitas AP has fully repaid this loan facility in May
pinjaman ini pada bulan Mei 2024. 2024.
Sesuai dengan ketentuan dalam perjanjian In accordance with the facility agreement, AP
fasilitas, AP diharuskan untuk menjaga is required to maintain certain financial ratios.
beberapa rasio keuangan tertentu. AP juga AP is also required to comply with certain
diharuskan untuk memenuhi beberapa terms and conditions with regard to certain
persyaratan dan ketentuan mengenai hal-hal matters regulated in its Articles of Association,
tertentu yang diatur dalam Anggaran Dasar, the general nature of its business, corporate
sifat umum kegiatan usaha, aksi korporasi, actions, financing activities and other matters.
kegiatan pembiayaan dan lainnya. Pada As at 31 December 2024 and 2023, AP is in
tanggal 31 Desember 2024 dan 2023, AP telah compliance with the financial ratios and related
memenuhi rasio keuangan dan persyaratan terms and conditions.
dan ketentuan tersebut.
Pada tanggal 31 Desember 2024, Grup tidak lagi On 31 December 2024, the Group no longer
mengakui utang atas fasilitas-fasilitas dibawah ini recognise loan of these below facilities due to the
karena Perusahaan secara efektif telah menjual Company has effectively sold mostly of its share
sebagian besar kepemilikan saham di Adaro sehingga ownership in Adaro, therefore, the Company has
Perusahaan menghentikan pengakuan Grup Adaro derecognised Adaro Group and presents it as
dan menyajikannya sebagai operasi yang dihentikan discontinued operations (Note 40):
(Catatan 40):
f. Perjanjian Fasilitas AS$400.000 f. US$400,000 Facility Agreement
Pada tanggal 23 April 2021, AI mengadakan On 23 April 2021, AI entered into a Facility
Perjanjian Pemberian Fasilitas Pinjaman Agreement of US$400,000 with a syndicate of
sebesar AS$400.000 dengan sindikasi bank international and national banks, for which
internasional dan nasional, yang mana Bank Bank Mandiri acts as the facility agent. The
Mandiri bertindak sebagai agen fasilitas. Company acts as the guarantor of this loan
Perusahaan bertindak sebagai penjamin atas facility. This loan facility was used to refinance
fasilitas pinjaman ini. Fasilitas pinjaman ini all amounts due under previous loan facility
digunakan untuk membiayai kembali semua agreements.
jumlah yang terutang berdasarkan perjanjian
fasilitas sebelumnya.
Pada tanggal 21 Februari 2023, AI mengubah On 21 February 2023, AI amended the
Perjanjian Fasilitas AS$400.000 untuk US$400,000 Facility Agreement to change the
mengubah suku bunga dari LIBOR menjadi interest rate from LIBOR to SOFR, which was
SOFR yang berlaku efektif pada tanggal effective from 27 April 2023.
27 April 2023.
Fasilitas pinjaman ini akan jatuh tempo pada This facility has a final maturity date of 23 April
tanggal 23 April 2026 dan dibayarkan cicilan 2026 and is payable in installments on a
setiap kuartal, dikenakan bunga sebesar quarterly basis, bears interest at SOFR plus a
SOFR ditambah persentase tertentu, dan tidak certain percentage, and is not bound by any
diikat dengan jaminan apapun. collateral.
Selama periode 1 Januari 2024 sampai For the period between 1 January 2024 until
dengan 9 Desember 2024, AI telah melakukan 9 December 2024, AI has fully repaid the loan
pelunasan pinjaman ini sebesar AS$84.000 amounting to US$84,000 (For the year ended
(Selama tahun yang berakhir pada 31 December 2023: 256,000).
31 Desember 2023: AS$256.000).
Page 115
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/94 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
g. Perjanjian Fasilitas AS$603.600 dan g. US$603,600 and Rp952,100,000,000 Facility
Rp952.100.000.000 Agreement
Pada 12 Mei 2023, KPI menandatangani On 12 May 2023, KPI entered into a Facility
Perjanjian Fasilitas dengan sindikasi bank Agreement with a syndicate of national banks
nasional yang mana Bank Mandiri bertindak for which Bank Mandiri acts as the facility
sebagai agen fasilitas (“Fasilitas Pinjaman agent (“KPI’s Loan Facility”).
KPI”).
Fasilitas Pinjaman KPI terdiri dari fasilitas KPI’s Loan Facility consists of term loan
pinjaman berjangka dalam mata uang: (i) facilities made available in: (i) US Dollars, with
Dolar AS, dengan total komitmen sebesar a total commitment of US$603,600 and an
AS$603.600 dan tingkat suku bunga tahunan annual interest rate of SOFR plus a certain
sebesar SOFR ditambah persentase tertentu percentage ("KPI’s Tranche A Loan Facility”);
("Fasilitas Pinjaman KPI Tranche A”); serta (ii) and (ii) Rupiah, with a total commitment of
Rupiah, dengan total komitmen sebesar Rp952,100,000.000 (full amount) and an
Rp952.100.000.000 (nilai penuh) dan tingkat annual interest rate of JIBOR plus a certain
suku bunga tahunan sebesar JIBOR ditambah percentage (“KPI’s Tranche B Loan Facility”).
persentase tertentu (“Fasilitas Pinjaman KPI KPI’s Loan facility will mature no later than 10
Tranche B”). Fasilitas Pinjaman KPI ini akan (ten) years from the signing date of KPI’s Loan
jatuh tempo paling lama 10 (sepuluh) tahun Facility.
sejak tanggal penandatanganan Fasilitas
Pinjaman KPI.
Fasilitas Pinjaman KPI akan digunakan untuk KPI’s Loan Facility will be used for financing
pembiayaan pengembangan proyek the development of a power plant project
pembangkit listrik yang berlokasi di kawasan located in an industrial area developed by
industri yang dikembangkan oleh KIPI, di KIPI, in North Kalimantan, Indonesia.
Kalimantan Utara, Indonesia.
Terkait dengan Fasilitas Pinjaman KPI, Adaro In relation to KPI’s Loan Facility, Adaro has
telah memberikan jaminan gadai atas saham pledged its shares pro-rate as per its
secara prorata sesuai kepemilikannya dan ownership and the Company has also
Perusahaan juga telah memberikan jaminan provided corporate guarantee proportionately.
perusahaan secara proporsional. Selain itu, Along with that, KPI has also pledged its bank
KPI juga telah memberikan jaminan berupa accounts and provided fiduciary security on its
jaminan gadai atas rekening bank dan jaminan material fixed assets, and will provide fiduciary
fidusia atas aset tetap material milik KPI, serta security on its receivables and mortgage over
akan memberikan jaminan fidusia atas piutang land located in KPI’s project area.
yang diterima oleh KPI dan hak tanggungan
atas tanah yang berlokasi di area proyek KPI.
Pada tanggal 14 November 2024, KPI dan On 14 November 2024, KPI and Bank Mandiri
Bank Mandiri telah menandatangani Akta signed Deed of Amendment and Restatement
Perjanjian Perubahan dan Pernyataan Agreement No. 51 related with changes of
Kembali No. 51 sehubungan dengan corporate guarantor, modifying from the
perubahan pemberi jaminan, yang semula Company to Adaro.
Perusahaan menjadi Adaro.
Selama periode 1 Januari 2024 sampai For the period between 1 January 2024 until
dengan 9 Desember 2024, KPI melakukan 9 December 2024, KPI made drawdowns of
penarikan sebeas AS$90.960 atas Fasilitas US$90,960 on KPI’s Tranche A Loan Facility
Pinjaman KPI Tranche A dan Rp and Rp 143,480,000,000 (full amount)
143.480.000.000 (nilai penuh) (setara dengan (equivalent to US$9,036) on KPI’s Tranche B
AS$9.036) atas Fasilitas Pinjaman KPI Loan Facility (For the year ended 31
Tranche B (Selama tahun yang berakhir pada December 2023: drawdowns of US$45,300 on
tanggal 31 Desember 2023: penarikan KPI’s Tranche A Loan Facility and
sebesar AS$45.300 atas Fasilitas Pinjaman Rp71,455,000,000 (full amount) (equivalent to
KPI Tranche A dan Rp71.455.000.000 (nilai US$4,760) on KPI’s Tranche B Loan Facility).
penuh) (setara dengan AS$4.760) atas During 2024 and 2023, KPI did not make any
Fasilitas Pinjaman KPI Tranche B). Selama repayments on KPI’s Tranche A and B Loan
tahun 2024 dan 2023, KIPI tidak melakukan Facilities.
pembayaran atas Fasilitas Pinjaman KPI
Tranche A mapun Fasilitas Pinjaman KPI
Tranche B.
Page 116
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/95 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
h. Perjanjian Fasilitas AS$40.000 h. US$40,000 Facility Agreement
Pada tanggal 5 Desember 2017, AIS On 5 December 2017, AIS entered into an
menandatangani Perjanjian Uncommitted Uncommitted Multi-Currency Revolving Term
Multi-Currency Revolving Term Loan Facility Loan Facility Agreement of US$50,000 with
sebesar AS$50.000 dengan DBS Bank Ltd. DBS Bank Ltd. As at 28 February 2022, the
Pada tanggal 28 Februari 2022, fasilitas loan facility has been reduced to US$40,000.
pinjaman ini telah diturunkan menjadi This loan facility was used for working capital.
AS$40.000. Fasilitas pinjaman ini digunakan
untuk membiayai kebutuhan modal kerja.
Pada tanggal 30 Juni 2023, AIS On 30 June 2023, AIS signed an amendment
menandatangani surat perubahan untuk letter to change the interest rate applicable for
mengubah suku bunga yang berlaku atas this loan facility from LIBOR to SOFR. This
fasilitas pinjaman ini dari LIBOR menjadi loan facility bears interest at SOFR plus a
SOFR. Fasilitas pinjaman ini dikenakan bunga certain percentage.
sebesar SOFR ditambah persentase tertentu.
Pada tahun 2020, AIS melakukan penarikan In 2020, AIS made drawdowns of US$40,000
sebesar US$40.000 dari pinjaman tersebut. from the loan. During 2024 and 2023, AIS did
Pada tahun 2024 dan 2023, AIS tidak not make any drawdowns or repayments.
melakukan penarikan atau pembayaran.
Pada tanggal 29 November 2024, AIS On 29 November 2024, AIS signed an
menandatangani surat perubahan untuk amendment letter to, among others, revise the
antara lain, mengubah ketentuan mengenai provisions regarding security, and guarantor.
jaminan dan penjamin. Setelah adanya Following this amendment, the Company
perubahan ini, Perseroan yang sebelumnya which previously acted as the guarantor for
bertindak sebagai penjamin atas fasilitas this loan facility was subsequently released
pinjaman ini dilepaskan dari kewajiban- from its obligations as guarantor and the
kewajibannya sebagai penjamin dan penjamin guarantor was replaced to Adaro.
digantikan oleh Adaro.
i. Perjanjian Pinjaman Properti Komersial i. Commercial Property Loan Agreement
AIS memperoleh pinjaman properti komersial AIS obtained a commercial property loan of
sebesar S$10.751.900 (nilai penuh) dari UOB S$10,751,900 (full amount) from UOB Bank
Bank Limited Singapore sebagaimana Limited Singapore as set out in the letter of
tercantum dalam surat penawaran tertanggal offer dated 10 October 2022. This loan facility
10 Oktober 2022. Fasilitas pinjaman ini was used for the purchase of a commercial
digunakan untuk pembelian properti property. The property is pledged for this
komersial. Properti tersebut dijaminkan untuk facility (Note 10). The loan bears interest at the
fasilitas ini (Catatan 10). Pinjaman ini Singapore Overnight Rate Average (“SORA”)
dikenakan bunga sebesar Singapore plus a certain percentage and has a final
Overnight Rate Average (“SORA”) ditambah maturity date of ten years from the first
persentase tertentu dan memiliki jangka waktu drawdown date.
sepuluh tahun sejak tanggal penarikan
pertama.
AIS telah melakukan penarikan sebesar AIS has made a drawdown of S$10,751,900
S$10.751.900 (nilai penuh) dari pinjaman (full amount) from the loan. For the period
tersebut. Selama periode 1 Januari 2024 between 1 January 2024 until 9 December
sampai dengan 9 Desember 2024, AIS telah 2024, AIS has made instalment payments
melakukan pembayaran cicilan sebesar amounting to S$1,075,200 (full amount)
S$1.075.200 (nilai penuh) (setara dengan (equivalent to US$804) (For the year ended 31
AS$804) (Selama tahun yang berakhir pada December 2023: S$1,075,200 (full amount)
tanggal 31 Desember 2023: S$1.075.200 (equivalent to US$800)).
(nilai penuh) (setara dengan AS$800)).
Page 117
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/96 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
j. Perjanjian Kredit Rp144.770.529.123 j. Rp144,770,529,123 Credit Agreement
Pada tanggal 25 Mei 2023, ATB On 25 May 2023, ATB entered into a Credit
menandatangani Perjanjian Kredit sebesar Agreement of Rp144,770,529,123 (full
Rp144.770.529.123 (nilai penuh) dengan amount) with PT Bank Central Asia Tbk which
PT Bank Central Asia Tbk termasuk juga di includes a Bank Guarantee facility of
dalamnya fasilitas Bank Garansi sebesar Rp7,500,000,000 (full amount). APM acts as a
Rp7.500.000.000 (nilai penuh). APM bertindak guarantor for this loan facility.
sebagai penjamin atas fasilitas pinjaman ini.
Fasilitas pinjaman ini digunakan untuk This loan facility is utilised to finance the
membiayai proyek SPAM Brayan Kota Medan Brayan Medan City SPAM project with a
dengan kapasitas 500 liter per detik. Fasilitas capacity of 500 litres per second. This loan
pinjaman ini dikenakan suku bunga sebesar facility is subject to an interest rate of JIBOR
JIBOR ditambah persentase tertentu per plus a certain percentage per annum and will
tahun dan akan jatuh tempo dalam jangka mature within a period of eleven years from the
waktu sebelas tahun sejak tanggal date of the first loan drawdown of the loan
dilakukannya pencairan pertama atas fasilitas facility.
pinjaman.
Pinjaman ini dijamin dengan jaminan berupa The loan is secured with pledges of ATM’s and
gadai saham ATM dan ATS di ATB, gadai atas ATS’ shares in ATB, pledge of ATB’s bank
rekening bank ATB, jaminan fidusia atas hasil accounts, fiduciary security over the proceeds
klaim asuransi, jaminan fidusia atas bank of insurance claims, fiduciary security over
garansi, jaminan fidusia atas hak tagih bank guarantees, fiduciary security over right
Perjanjian Kerja Sama dengan Perusahaan to claim under the Cooperation Agreement
Umum Daerah Tirtanadi, jaminan fidusia atas with Perusahaan Umum Daerah Tirtanadi,
mesin dan peralatan, jaminan fidusia atas fiduciary security over machineries and
piutang dan hak tanggungan atas tanah ATB equipment, fiduciary security over receivables
yang digunakan sebagai area proyek. and mortgages over ATB’s land which is
designated for the project area.
Selama periode 1 Januari 2024 sampai For the period between 1 January 2024 until 9
dengan 9 Desember 2024, ATB melakukan December 2024, ATB made drawdowns of
penarikan sebesar Rp60.396.196.682 (nilai Rp60,396,196,682 (full amount) (equivalent to
penuh) (setara dengan AS$3.815) (Selama US$3,815) (For the year ended 31 December
tahun yang berakhir pada tanggal 31 2023: Rp14,147,151,112 (full amount)
Desember 2023: Rp14.147.151.112 (nilai (equivalent to US$920)) on the term loan
penuh) (setara dengan AS$920)) atas fasilitas facility.
pinjaman berjangka.
Pada tanggal 16 Oktober 2024, ATB dan PT On 16 October 2024, ATB and PT Bank
Bank Central Asia Tbk telah menandatangani Central Asia Tbk signed First Amendment of
Perubahan Pertama atas Perjanjian Kredit Rp144,770,529,123 Credit Agreement related
Rp144.770.529.123 sehubungan dengan with changes to shareholding provisions,
perubahan ketentuan terkait dengan modifying the direct and indirect at least 51%
kepemilikan saham, yang semula kepemilikan shareholding from by the Company in ATB and
saham setidaknya sebesar 51% baik langsung APM to direct and indirect at least 51%
maupun tidak langsung oleh Perusahaan di shareholding by Adaro in ATB and APM.
ATB dan APM, menjadi kepemilikan saham
setidaknya sebesar 51% baik langsung
maupun tidak langsung oleh Adaro di ATB dan
APM.
k. Perjanjian Fasilitas Rp260.000.000.000 k. Rp260,000,000,000 Facility Agreement
Pada tanggal 26 Februari 2024, ATM On 26 February 2024, ATM signed a Loan
menandatangani Perjanjian Pinjaman sebesar Agreement of Rp260,000,000,000 (full
Rp260.000.000.000 (nilai penuh) dengan PT amount) with PT Bank Permata Tbk (“Loan
Bank Permata Tbk (“Perjanjian Pinjaman”). Agreement”).
Page 118
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/97 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
k. Perjanjian Fasilitas Rp260.000.000.000 k. Rp260,000,000,000 Facility Agreement
(lanjutan) (continued)
Fasilitas pinjaman ini akan digunakan untuk This loan facility will be used to finance the
membiayai proyek Sistem Penyediaan Air Sukatani Drinking Water Supply System
Minum (“SPAM”) Sukatani dengan Kapasitas (“SPAM”) project with a capacity of 2x100 litres
2x100 liter per detik, membiayai proyek per second, finance the Non-Revenue Water
Penurunan Air Tak Berekening di Wilayah Reduction project in the North Area of
Utara Kota Bandung, membayar kembali Bandung City, repaying several of ATM’s
pinjaman beberapa anak perusahaan ATM, subsidiaries’ loans, and paying transaction
serta membayar biaya transaksi dan biaya lain fees and other costs related to this Loan
yang berhubungan dengan Perjanjian Agreement.
Pinjaman ini.
Fasilitas pinjaman ini terdiri dari: This loan facility consists of: (i) a term loan
(i) fasilitas pinjaman berjangka sebesar facility of Rp220,000,000,000 (full amount)
Rp220.000.000.000 (nilai penuh) yang akan maturing within 108 months from the date of
jatuh tempo dalam jangka waktu 108 bulan this Loan Agreement; and (ii) a revolving loan
sejak tanggal Perjanjian Pinjaman ini; dan facility of Rp40,000,000,000 (full amount)
(ii) fasilitas pinjaman revolving sebesar which will mature within 60 months from the
Rp40.000.000.000 (nilai penuh) yang akan date of this Loan Agreement. This facility is
jatuh tempo dalam jangka waktu 60 bulan subject to interest in the amount of JIBOR plus
sejak tanggal Perjanjian Pinjaman ini. Fasilitas a certain percentage and is bound by collateral
ini dikenakan bunga sebesar JIBOR ditambah in the form of pledge of ATM’s and its
persentase tertentu dan diikat dengan jaminan subsidiary’s shares.
berupa gadai saham yang dimiliki ATM dan
anak perusahaannya.
Selama periode 1 Januari 2024 sampai For the period between 1 January 2024 until
dengan 9 Desember 2024, ATM melakukan 9 December 2024, ATM made drawdowns of
penarikan sebesar Rp85,8 miliar (nilai penuh) Rp85.8 billion (full amount) (equivalent to
(setara dengan AS$5.460) atas fasilitas US$5,460) on the term loan facility.
pinjaman berjangka.
Pada tanggal 25 Oktober 2024, ATM dan PT On 25 October 2024, ATM and PT Bank
Bank Permata Tbk telah menandatangani Permata Tbk signed Amendment I of
Addendum I atas Perjanjian Pinjaman Rp260,000,000,000 Loan Agreement related
Rp260.000.000.000 sehubungan dengan with provisions regarding the change of control
ketentuan perubahan pengendalian ATM dan of ATM and its several subsidiaries,
beberapa anak perusahaannya, yang semula transferring control from the Company to
Perusahaan menjadi Adaro. Adaro.
l. Perjanjian Fasilitas AS$250.000 dan l. US$250,000 and Rp3,800,000,000,000
Rp3,800,000,000,000 Facility Agreement
Pada tanggal 24 Oktober 2024, AI On 24 October 2024, AI entered into a
mengadakan Perjanjian Fasilitas Kredit Multicurrency US$250,000,000 and
Bergulir Multivaluta AS$250.000.000 dan Rp3,800,000,000,000 Revolving Credit
Rp3.800.000.000.000 (nilai penuh) Facility Agreement (full amount) (“Syndicated
(“Perjanjian Pinjaman Sindikasi”) dengan Loan Agreement”) with a syndicate of banks,
sindikasi bank, yang mana PT Bank Central for which PT Bank Central Asia Tbk acts as the
Asia Tbk bertindak sebagai agen fasilitas. facility agent. Adaro acts as the guarantor of
Adaro bertindak sebagai penjamin atas this loan facility.
fasilitas pinjaman ini.
Fasilitas pinjaman AI terdiri dari fasilitas AI's loan facility consists of revolving loan
pinjaman revolving dalam mata uang: (i) Dolar facilities in the following currencies: (i) US
AS, dengan total komitmen sebesar Dollars, with a total commitment of
AS$250.000 dan tingkat suku bunga tahunan US$250,000 and an annual interest rate of
sebesar SOFR ditambah presentase tertentu SOFR plus a certain percentage ("AI’s Loan
("Fasilitas Pinjaman AI Tranche A"); serta (ii) Facility Tranche A"); and (ii) Indonesian
Rupiah, dengan total komitmen sebesar Rupiah, with a total commitment of
Rp3.800.000.000.000 (nilai penuh) dan tingkat Rp3,800,000,000,000 (full amount) and an
suku bunga tahunan sebesar JIBOR ditambah annual interest rate of JIBOR plus a certain
presentase tertentu ("Fasilitas Pinjaman AI percentage ("AI’s Loan Facility Tranche B").
Tranche B"). Fasilitas pinjaman ini akan jatuh This loan facility will be due in 3 years from the
tempo 3 tahun sejak tanggal Perjanjian date of the Syndicated Loan Agreement.
Pinjaman Sindikasi.
Page 119
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/98 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
19. UTANG BANK (lanjutan) 19. BANK LOANS (continued)
l. Perjanjian Fasilitas AS$250.000 dan l. US$250,000 and Rp3,800,000,000,000
Rp3,800,000,000,000 Facility Agreement
Fasilitas Pinjaman AI akan digunakan antara The AI Loan Facility will be used, among other
lain untuk membayar pengeluaran modal, things, to cover capital expenditures,
biaya transaksi dan biaya lain yang transaction fees, and other costs related to this
berhubungan dengan fasilitas ini dan facility, as well as for other general corporate
keperluan korporasi umum lainnya. purposes.
Pada tanggal 24 Oktober 2024, AI telah On 24 October 2024, AI has made full
melakukan penarikan penuh pada fasilitas drawdown on the multicurrency revolving loan
pinjaman bergulir multivaluta tersebut. facilities.
Selama tahun 2024, AI belum melakukan During 2024, AI has not made payments yet.
pembayaran.
20. SENIOR NOTES 20. SENIOR NOTES
2024 2023
Nilai muka - 750,000 Face value
Pembelian dari pasar terbuka - (49,957) Purchases from the open market
Diskonto dan biaya penerbitan - (15,975) Discount and issuance cost
Amortisasi diskonto dan biaya Amortisation of discount and
penerbitan - 13,121 issuance costs
Total - 697,189 Total
Pada tanggal 31 Oktober 2019, AI menerbitkan On 31 October 2019, AI issued Guaranteed Senior
Guaranteed Senior Notes (“Senior Notes”) sebesar Notes (the “Senior Notes”) amounting to
AS$750.000, dengan harga penerbitan 98,892%. US$750,000, with the issue price of 98.892%. The
Senior Notes jatuh tempo pada tahun 2024 dengan Senior Notes is matured in 2024 and bear a fixed
menanggung tingkat suku bunga tetap 4,25% yang interest rate of 4.25%, which is payable semi-annually
dibayarkan secara semi-annual pada tanggal 30 April in arrears on 30 April and 31 October of each year,
dan 31 Oktober setiap tahun, yang dimulai pada commencing on 30 April 2020. The Senior Notes are
tanggal 30 April 2020. Senior Notes tersebut dijamin unconditionally and irrevocably guaranteed by the
oleh Perusahaan, tanpa syarat dan tidak dapat Company.
dibatalkan.
Senior Notes tersebut diterbitkan berdasarkan The Senior Notes were issued under an indenture
perjanjian antara AI, Perusahaan, dan The Bank of between AI, the Company and The Bank of New York
New York Mellon, sebagai wali amanat. Mellon, as the trustee.
Hasil dari Senior Notes digunakan untuk pembayaran The net proceeds of the Senior Notes were used to
sebagian saldo utang bank AI ketika jatuh tempo repay a portion of AI’s existing bank loans when they
sesuai dengan jadwal amortisasinya, untuk fell due under their existing amortisation schedules,
pembayaran utang tambahan, tujuan umum for additional debt repayment, general corporate
perusahaan dan pengeluaran modal Grup. purposes and capital expenditures of the Group.
Senior Notes tersebut terdaftar di Singapore The Senior Notes were listed on the Singapore
Exchange Securities Trading. Exchange Securities Trading.
Senior Notes telah jatuh tempo dan dilunasi pada The Senior Notes had matured and fully paid in
bulan Oktober 2024. October 2024.
21. LIABILITAS IMBALAN PASCA KERJA 21. POST-EMPLOYMENT BENEFITS LIABILITIES
Liabilitas imbalan pasca kerja pada tanggal Post-employment benefits liabilities as at
31 Desember 2024 dan 2023 dihitung oleh Kantor 31 December 2024 and 2023 were calculated by
Konsultan Aktuaria Riana & Rekan, aktuaris Riana & Partners Actuarial Consulting Firm,
independen, dengan laporan yang diterbitkan pada independent actuaries, in actuarial reports issued in
tahun 2025 dan 2024. 2025 and 2024.
Page 120
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/99 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
21. LIABILITAS IMBALAN PASCA KERJA (lanjutan) 21. POST-EMPLOYMENT BENEFITS LIABILITIES
(continued)
Asumsi-asumsi utama yang digunakan dalam The principal assumptions used in determining the
menentukan liabilitas imbalan pasca kerja karyawan Group’s post-employment benefits liabilities are as
Grup adalah sebagai berikut: follows:
2024 2023
Tingkat diskonto 6.75% - 7.25% 6.50% - 7.00% Discount rate
Tingkat kenaikan gaji 5% 5% Salary growth rate
Umur normal pensiun 55 55 Normal retirement age
Tingkat mortalitas dari Tabel Mortality rate from the Indonesian
Mortalitas Indonesia 100% TMI IV 100% TMI IV Mortality Table
Melalui program pensiun imbalan pasti, Grup Through its defined benefit pension plans, the Group
menghadapi sejumlah risiko signifikan sebagai is exposed to a number of significant risks which are
berikut: detailed below:
1) Perubahan tingkat diskonto 1) Changes in discount rate
Penurunan pada tingkat diskonto menyebabkan A decrease in discount rate will increase plan
kenaikan liabilitas program. liabilities.
2) Tingkat kenaikan gaji 2) Salary growth rate
Liabilitas imbalan pensiun Grup berhubungan The Group’s pension obligations are linked to
dengan tingkat kenaikan gaji, dan semakin tinggi salary growth rate, and higher salary growth rate
tingkat kenaikan gaji akan menyebabkan will lead to higher liabilities.
semakin besarnya liabilitas.
Sensitivitas liabilitas imbalan pasti terhadap The sensitivity of the defined benefit obligation to
perubahan asumsi utama tertimbang pada 31 changes in the weighted principal assumptions as at
Desember 2024 adalah sebagai berikut: 31 December 2024 is as follows:
Dampak terhadap liabilitas
imbalan pasti/Impact on
defined benefits obligation
Perubahan Kenaikan Penurunan
asumsi/ asumsi/ asumsi/
Change in Increase in Decrease
assumptions assumptions in assumptions
Tingkat diskonto 1% (2,536) 2,847 Discount rate
Tingkat kenaikan gaji 1% 3,072 (2,777) Salary growth rate
Total liabilitas imbalan pasca kerja yang diakui di Post-employment benefits liabilities recognised in the
laporan posisi keuangan konsolidasian pada tanggal consolidated statements of financial position as at
31 Desember 2024 dan 2023 ditentukan sebagai 31 December 2024 and 2023 are computed as
berikut: follows:
2024 2023
Nilai kini dari kewajiban
yang didanai 10,747 11,079 Present value of funded obligations
Nilai wajar dari aset program (1,385) (1,402) Fair value of plan assets
Penghentian pengakuan atas
dampak operasi yang Derecognition due to
dihentikan (9,362) - discontinued operations
Defisit program yang didanai - 9,677 Deficit of the funded plans
Nilai kini dari kewajiban yang
tidak didanai 42,664 64,261 Present value of unfunded obligations
Total liabilitas 42,664 73,938 Total liabilities
Page 121
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/100 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
21. LIABILITAS IMBALAN PASCA KERJA (lanjutan) 21. POST-EMPLOYMENT BENEFITS LIABILITIES
(continued)
Mutasi nilai wajar aset program Grup selama tahun The movement in the Group’s fair value of plan assets
berjalan adalah sebagai berikut: during the year is as follows:
2024 2023
Pada awal tahun 1,402 1,335 At the beginning of the year
Penghasilan bunga dari
aset program 69 100 Interest income on plan assets
Kerugian atas pengukuran
kembali: Remeasurement loss:
Hasil dari aset program, tidak
termasuk jumlah yang Return on plan assets,
dimasukkan dalam excluding amount included in
penghasilan bunga (22) (59) interest income
Perubahan selisih kurs (64) 26 Foreign exchange difference
Penghentian pengakuan atas
dampak operasi yang Derecognition due to
dihentikan (1,385) - discontinued operations
Pada akhir tahun - 1,402 At the end of the year
Mutasi nilai kini kewajiban imbalan pasti Grup adalah The movement in the present value of the Group’s
sebagai berikut: defined benefits obligation is as follows:
2024 2023
Pada awal tahun 75,340 60,623 At the beginning of the year
Biaya jasa kini 7,412 15,026 Current service cost
Biaya bunga 3,892 4,149 Interest expense
Biaya jasa lalu 421 (2,704) Past service cost
Pengukuran kembali: Remeasurements:
- (Keuntungan)/kerugian dari (Gain)/loss from change in -
perubahan asumsi keuangan (1,561) 2,172 financial assumptions
- (Keuntungan)/kerugian dari (Gain)/loss from -
penyesuaian pengalaman (913) 1,900 experience adjustments
- Keuntungan dari perubahan Gain from changes in -
asumsi demografi - (332) demographic assumptions
Pengurangan atau penyelesaian 815 - Curtailment or settlement
Imbalan yang dibayar (13,898) (6,647) Benefits paid
Perubahan selisih kurs (3,421) 1,153 Foreign exchange difference
Penghentian pengakuan atas
dampak operasi yang Derecognition due to
dihentikan (25,423) - discontinued operations
Pada akhir tahun 42,664 75,340 At the end of the year
Mutasi liabilitas imbalan kerja karyawan Grup adalah The movement in the Group’s post-employment
sebagai berikut: benefits liabilities is as follows:
2024 2023
Pada awal tahun 73,938 59,288 At the beginning of the year
Biaya jasa kini 7,412 15,026 Current service cost
Biaya bunga, neto 3,823 4,049 Interest expense, net
Biaya jasa lalu 421 (2,704) Past service cost
Pengukuran kembali: Remeasurements:
- (Keuntungan)/kerugian dari (Gain)/loss from change in -
perubahan asumsi keuangan (1,561) 2,172 financial assumptions
- (Keuntungan)/kerugian dari (Gain)/loss from -
penyesuaian pengalaman (913) 1,900 experience adjustments
- Hasil dari aset program,
tidak termasuk jumlah yang Return on plan assets, -
dimasukkan dalam excluding amount included in
penghasilan bunga 22 59 interest income
- Keuntungan dari perubahan Gain from changes in -
asumsi demografi - (332) demographic assumptions
Pengurangan atau penyelesaian 815 - Curtailment or settlement
Perubahan selisih kurs (3,357) 1,127 Foreign exchange difference
Imbalan yang dibayar (13,898) (6,647) Benefits paid
Penghentian pengakuan atas
dampak operasi yang Derecognition due to
dihentikan (24,038) - discontinued operations
Pada akhir tahun 42,664 73,938 At the end of the year
Page 122
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/101 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
21. LIABILITAS IMBALAN PASCA KERJA (lanjutan) 21. POST-EMPLOYMENT BENEFITS LIABILITIES
(continued)
Jumlah yang diakui pada laba rugi adalah sebagai The amounts recognised in profit or loss are as
berikut: follows:
2024 2023
Biaya jasa kini 7,412 15,026 Current service cost
Biaya bunga, neto 3,823 4,049 Interest expense, net
Pengukuran kembali: Remeasurements:
- (Keuntungan)/kerugian dari (Gain)/loss from change -
perubahan asumsi keuangan (88) 134 in financial assumptions
- Kerugian dari Loss from -
penyesuaian pengalaman 1,123 87 experience adjustments
- Kerugian dari perubahan Loss from changes in -
asumsi demografi - 12 demographic assumptions
Pengurangan atau penyelesaian 815 - Curtailment or settlement
Penghentian pengakuan atas
dampak operasi yang Derecognition due to
dihentikan 25 - discontinued operations
Biaya jasa lalu 421 (2,704) Past service cost
Perubahan selisih kurs (3,357) 1,127 Foreign exchange difference
Total 10,174 17,731 Total
Hasil aktual aset program untuk tahun yang berakhir The actual return on plan assets for the year ended
pada tanggal 31 Desember dan 2023 adalah rugi 31 December 2023 was a loss of US$100.
sebesar AS$100.
Pada tanggal 31 Desember 2023, aset program As at 31 December 2023, the plan assets were fully
ditempatkan seluruhnya pada instrumen pasar uang invested in the money market, which did not have a
yang tidak memiliki harga pasar yang dikutip. quoted market.
Durasi rata-rata tertimbang kewajiban imbalan pasti The weighted average duration of the defined
pada akhir tahun pelaporan Grup berkisar antara 2 benefits plan obligation at the end of the reporting
sampai dengan 24 tahun. year for the Group is approximately 2 to 24 years.
Perkiraan analisis jatuh tempo atas imbalan pensiun Expected maturity analysis of undiscounted pension
tidak terdiskonto pada tanggal 31 Desember 2024 benefits as at 31 December 2024 is presented below:
adalah sebagai berikut:
Kurang dari Antara Antara Lebih dari
1 tahun/ 1-2 tahun/ 2-5 tahun/ 5 tahun/
Less than Between Between Over
1 year 1-2 years 2-5 years 5 years Total
Imbalan pensiun 4,888 7,860 27,729 350,654 391,131 Pension benefits
Manajemen Grup berpendapat bahwa liabilitas The management of the Group believes that the
imbalan pasca kerja cukup untuk menutupi semua estimated liability provided for post-employment
imbalan pasca kerja yang diatur dalam Peraturan benefits is adequate to cover all post-employment
Ketenagakerjaan atau PP atau PKB. benefits requirements of the Manpower Regulations
or CR or CLA.
Page 123
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/102 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
22. PROVISI PEMBONGKARAN, REHABILITASI, 22. PROVISION FOR DECOMMISSIONING, MINE
REKLAMASI DAN PENUTUPAN TAMBANG REHABILITATION, RECLAMATION AND
CLOSURE
2024 2023
Saldo awal 214,568 183,754 Beginning balance
Penambahan 46,923 41,344 Additions
Realisasi (12,781) (11,176) Realisation
Akresi 713 634 Accretion
Perubahan selisih kurs - 12 Foreign exchange difference
Penghentian pengakuan
atas dampak operasi Derecognition due to
yang dihentikan (219,094) - discontinued operations
Saldo akhir 30,329 214,568 Ending balance
Dikurangi: Less:
Bagian jangka pendek 4,855 5,802 Current portion
Bagian jangka panjang 25,474 208,766 Non-current portion
Penambahan provisi dari operasi yang berlanjut untuk The additions in the provision from continuing
tahun 2024 dialokasikan ke beban pokok pendapatan operations for the year 2024 were allocated to cost
dan beban lain-lain, neto masing-masing adalah of revenue and other expenses, net amounting to
sebesar AS$5.050 (2023: AS$1.804) (Catatan 30) dan US$5,050 (2023: US$1,804) (Note 30) and
(AS$3.538) (2023: AS$2.190), dan sisa saldonya (US$3,538) (2023: US$2,190), respectively, with the
dikapitalisasikan ke properti pertambangan dan aset remaining amount capitalised to mining properties
tetap (Catatan 37a). Penambahan provisi dari operasi and fixed assets (Note 37a). The additions in the
yang dihentikan dialokasikan ke beban pokok provision from discontinued operations were
pendapatan dari operasi yang dihentikan sebesar allocated to cost of revenue from discontinued
AS$45.329 (2023: AS$37.883). operations amounting to US$45,329 (2023:
US$37,883).
Asumsi utama yang digunakan dalam perhitungan The key assumptions used in the calculation of the
provisi pembongkaran, rehabilitasi, reklamasi, dan provision for decommissioning, mine rehabilitation,
penutupan tambang pada tanggal 31 Desember 2024 reclamation and closure as at 31 December 2024
dan 2023 adalah sebagai berikut: and 2023 are as follows:
2024 2023
Tingkat inflasi 2.80% - 3.92% 2.50% - 3.20% Inflation rate
Tingkat diskonto 5.49% - 7.08% 6.37% - 6.89% Discount rate
Provisi pembongkaran, rehabilitasi, reklamasi dan Provision for decommissioning, mine rehabilitation,
penutupan tambang merupakan provisi yang dibuat reclamation and closure represents the provision set
oleh Grup untuk memenuhi Peraturan Menteri up by the Group to comply with the Ministerial
Lingkungan Hidup dan Kehutanan Regulation of Environment and Forestry
No. P.59/MENLHK/SETJEN/KUM.1/10/2019 (Catatan No. P.59/MENLHK/SETJEN/KUM.1/10/2019 (Note
41h) dan PP No. 78 (Catatan 3 dan 42) untuk 41h) and GR No. 78 (Notes 3 and 42) for
rehabilitasi daerah aliran sungai, aktivitas reklamasi rehabilitation of the watershed area, reclamation and
dan pascatambang atas usaha penambangan post-mining activities for the coal mining business.
batubara.
Provisi pembongkaran ini juga sudah termasuk nilai Provision for decommissioning also includes the
provisi pembongkaran Pit Crushing and Conveying provision for dismantling of the Pit Crushing and
system (“PCC”). Grup mengakui penyisihan Conveying (“PCC”) system. The Group recognised
pembongkaran PCC sebesar AS$5.140 pada tanggal the provision for dismantling of the PCC amounting
31 Desember 2024 (2023: AS$11.029). Manajemen to US$5,140 as at 31 December 2024 (2023:
berkeyakinan bahwa total provisi atas pembongkaran US$11,029). Management believes that the
PCC merupakan estimasi terbaik saat ini untuk provision for dismantling of the PCC represents the
menutupi arus kas keluar di masa depan sehubungan current best estimate to cover future cash outflow in
dengan pembongkaran PCC di masa depan. Seluruh relation to the dismantling of the PCC in the future.
kegiatan pembongkaran diharapkan diselesaikan All the dismantling activities are expected to be
pada tahun 2025. completed by 2025.
Manajemen berkeyakinan bahwa keseluruhan provisi Management believes that the provision for
pembongkaran, rehabilitasi, reklamasi dan penutupan decommissioning, mine rehabilitation, reclamation
tambang pada tanggal 31 Desember 2024 dan 2023 and closure as at 31 December 2024 and 2023 is
telah cukup untuk memenuhi kewajiban sebagaimana sufficient to meet the obligations as stipulated in the
yang diatur pada Peraturan Menteri Lingkungan Hidup Minister of Environment and Forestry Regulation
dan Kehutanan dan PP No. 78 di atas, termasuk biaya and GR No. 78, including the dismantling costs of
pembongkaran PCC. the PCC.
Page 124
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/103 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
23. MODAL SAHAM DAN SAHAM TREASURI 23. SHARE CAPITAL AND TREASURY SHARES
Seluruh saham Perusahaan tercatat di Bursa Efek All shares in the Company have been listed on the
Indonesia sejak 16 Juli 2008. Struktur pemegang Indonesia Stock Exchange since 16 July 2008. The
saham Perusahaan pada tanggal 31 Desember 2024 Company’s shareholders as at 31 December 2024
dan 2023 berdasarkan catatan yang dibuat oleh PT and 2023 based on the records maintained by PT
Kustodian Sentral Efek Indonesia, biro administrasi Kustodian Sentral Efek Indonesia, the share
efek, adalah sebagai berikut: administrator, were as follows:
Persentase
Lembar kepemilikan/
saham/ Percentage
Number of of ownership Jumlah/
Pemegang saham/Shareholders shares (%) Amount
2024
ASI 14,045,425,500 45.66 150,589
Garibaldi Thohir (Presiden Direktur/President Director) 1,976,632,710 6.43 21,193
Edwin Soeryadjaya (Presiden Komisaris/President Commissioner) 1,051,738,544 3.42 11,276
Theodore Permadi Rachmat (Wakil Presiden Komisaris/
Vice President Commissioner) 812,988,601 2.64 8,717
Arini Saraswaty Subianto (Komisaris/Commissioner) 80,106,250 0.26 859
Christian Ariano Rachmat (Wakil Presiden Direktur/
Vice President Director) 16,000,000 0.05 172
Julius Aslan (Direktur/Director) 11,000,000 0.04 117
Iwan Dewono Budiyuwono (Direktur/Director) 2,800 0.00 1
Pemegang saham lainnya/Other shareholders 12,251,023,995 39.83 131,349
Total saham beredar/Total shares outstanding 30,244,918,400 98.33 324,273
Saham treasuri/Treasury shares 513,747,500 1.67 4,983
Total saham ditempatkan dan disetor penuh/
Total issued and fully paid shares 30,758,665,900 100.00 329,256
2023
ASI 14,045,425,500 43.91 150,589
Garibaldi Thohir (Presiden Direktur/President Director) 1,976,632,710 6.18 21,193
Edwin Soeryadjaya (Presiden Komisaris/President Commissioner) 1,051,738,544 3.29 11,276
Theodore Permadi Rachmat (Wakil Presiden Komisaris/
Vice President Commissioner) 812,988,601 2.54 8,717
Arini Saraswaty Subianto (Komisaris/Commissioner) 79,975,750 0.25 857
Christian Ariano Rachmat (Wakil Presiden Direktur/
Vice President Director) 16,000,000 0.05 172
Julius Aslan (Direktur/Director) 11,000,000 0.03 117
Chia Ah Hoo (Direktur/Director) 9,593,500 0.03 103
Pemegang saham lainnya/Other shareholders 12,877,851,295 40.27 138,071
Total saham beredar/Total shares outstanding 30,881,205,900 96.55 331,095
Saham treasuri/Treasury shares 1,104,756,100 3.45 11,845
Total saham ditempatkan dan disetor penuh/
Total issued and fully paid shares 31,985,962,000 100.00 342,940
Saham biasa memberikan hak kepada pemegangnya Ordinary shares entitle the holder to participate in
untuk memperoleh dividen dan hasil dari pembubaran dividends and the proceeds on the winding up of the
Perusahaan sesuai dengan proporsi jumlah lembar Company in proportion to the number of and
dan jumlah yang dibayarkan atas saham yang dimiliki. amounts paid on the shares held.
Pada tanggal 27 September 2021, Perusahaan On 27 September 2021, the Company announced its
mengumumkan rencana pembelian kembali plan to buyback its shares (“Buyback”) based on the
sahamnya (“Pembelian Kembali”) berdasarkan Financial Services Authority’s Regulation
Peraturan Otoritas Jasa Keuangan No. No. 2/POJK.04/2013 for a maximum amount of
2/POJK.04/2013 dengan jumlah sebanyak-banyaknya Rp4,000,000,000,000 (full amount) (equivalent to
sebesar Rp4.000.000.000.000 (nilai penuh) (setara US$278,280). The Buyback program was
dengan AS$278.280). Program Pembelian Kembali implemented in a period of 3 (three) months, from 27
dilaksanakan untuk periode 3 (tiga) bulan, dari tanggal September 2021 to 26 December 2021. The
27 September 2021 sampai dengan tanggal 26 Buyback period was then extended several times,
Desember 2021. Periode Pembelian Kembali with the latest period commencing on 14 February
kemudian diperpanjang beberapa kali, dengan periode 2023 to 12 May 2023.
terakhir dilaksanakan pada 14 Februari 2023 sampai
dengan 12 Mei 2023.
Page 125
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/104 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
23. MODAL SAHAM DAN SAHAM TREASURI (lanjutan) 23. SHARE CAPITAL AND TREASURY SHARES
(continued)
Pada tanggal 11 Mei 2023, Perusahaan mendapatkan On 11 May 2023, the Company obtained the
persetujuan dari Rapat Umum Pemegang Saham approval from its Annual General Meeting of
Tahunan (“RUPST”) Perusahaan untuk melakukan Shareholders (“AGMS”) to conduct the Buyback
Pembelian Kembali berdasarkan Peraturan Otoritas based on the Financial Services Authority’s
Jasa Keuangan No. 30/POJK.04/2017 dengan periode Regulation No. 30/POJK.04/2017 for the Buyback
pelaksanaan Pembelian Kembali selama 18 (delapan period of 18 (eighteen) months from 12 May 2023 to
belas) bulan terhitung sejak tanggal 12 Mei 2023 12 November 2024.
sampai dengan 12 November 2024.
Pada tanggal 15 Mei 2024, telah diadakan RUPST On 15 May 2024, the Company’s AGMS was held,
Perusahaan, dimana Perusahaan telah mendapatkan whereby the Company obtained the shareholders’
persetujuan para pemegang saham untuk melakukan approval to execute the reduction of the issued and
pengurangan modal ditempatkan dan disetor melalui paid-up capital by way of the withdrawal of the
penarikan saham hasil pembelian kembali Perusahaan shares obtained from the Company’s share buyback
sejumlah 1.227.296.100 saham atau setara dengan execution, in the amount of 1,227,296,100 shares,
3,84% dari modal ditempatkan dan disetor penuh or equivalent to 3.84% of the Company’s issued and
dalam Perusahaan. Dengan demikian, modal paid-up capital. Therefore, the Company’s issued
ditempatkan dan disetor Perusahaan yang semula and paid-up capital will reduce from 31,985,962,000
berjumlah 31.985.962.000 saham menjadi shares to 30,758,665,900 shares.
30.758.665.900 saham.
Selama tahun 2024, setelah penarikan saham hasil During 2024 after the withdrawal of the shares
pembelian kembali Perusahaan, Perusahaan obtained from the Company’s share buyback
melakukan Pembelian Kembali melalui Bursa Efek execution, the Company conducted the Buyback
Indonesia sejumlah 513.747.500 saham sebesar through the Indonesia Stock Exchange of
Rp1.122 miliar (nilai penuh) atau setara dengan 513,747,500 shares amounted to Rp1,122 billion
AS$70.667 (2023: 104.756.100 lembar saham (full amount) or equivalent to US$70,667
sebesar Rp274 miliar (nilai penuh) atau setara dengan (2023: 104,756,100 shares amounted to Rp274
AS$18.372). Sampai dengan tanggal 31 Desember billion (full amount) or equivalent to US$18,372).
2024, jumlah Pembelian Kembali adalah sejumlah Up to 31 December 2024, total Buyback was
513.747.500 saham (sampai dengan 31 Desember 513,747,500 shares (up to 31 December 2023:
2023: 1.104.756.100 saham). Total pembayaran untuk 1,104,756,100 shares). The total amount paid to
mengakuisisi saham tersebut adalah sebesar Rp1.122 acquire the shares was Rp1,122 billion (full amount)
miliar (nilai penuh) atau setara dengan AS$70.667 (31 or equivalent to US$70,667 (31 December 2023:
Desember 2023: Rp2.279 miliar (nilai penuh) atau Rp2,279 billion (full amount) or equivalent to
setara dengan AS$158.308). US$158,308).
24. TAMBAHAN MODAL DISETOR, NETO 24. ADDITIONAL PAID IN CAPITAL, NET
Saldo tambahan modal disetor pada tanggal The balance of additional paid-in capital as at
31 Desember 2024 dan 2023 adalah sebagai berikut: 31 December 2024 and 2023 was as follows:
2024 2023
Tambahan modal disetor saat
Penawaran Umum
Saham Perdana 1,219,813 1,219,813 Additional paid-in capital from IPO
Biaya emisi saham (44,532) (44,532) Share issuance costs
Selisih nilai transaksi Difference in value of restructuring
restrukturisasi entitas transactions of entities under
sepengendali (120,389) (20,787) common control
Pengurangan modal Reduction of issued
ditempatkan dan disetor (163,335) - and paid-up capital
Tambahan modal disetor, neto 891,557 1,154,494 Additional paid-in capital, net
Page 126
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/105 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
24. TAMBAHAN MODAL DISETOR, NETO (lanjutan) 24. ADDITIONAL PAID IN CAPITAL, NET (continued)
Tambahan modal disetor saat Penawaran Umum The additional paid-in capital from the IPO resulted
Saham Perdana berasal dari Penawaran Umum from the IPO in 2008.
Saham Perdana yang dilakukan pada tahun 2008.
Lihat Catatan 40 untuk informasi rincian transaksi dan Refer to Note 40 for information on the details of
saldo atas operasi yang dihentikan. transactions and balances of discontinued
operations.
25. SELISIH TRANSAKSI DENGAN PIHAK NON- 25. DIFFERENCE IN VALUE FROM TRANSACTIONS
PENGENDALI WITH NON-CONTROLLING INTEREST
Pada tanggal 12 Mei 2016, AI dan EGATi On 12 May 2016, AI and EGATi entered into the
menandatangani Perjanjian Pengambilan Saham Subscription Agreement. On 22 November 2016 (the
Baru. Pada tanggal 22 November 2016 (“Tanggal “Closing Date”), AI issued 57,857 shares to EGATi
Penutupan”), AI mengeluarkan 57.857 saham kepada for 11.53% ownership in AI, with a par value of
EGATi untuk 11,53% kepemilikan di AI, dengan nilai US$100 (full amount) per share, or a total nominal
nominal AS$100 (nilai penuh) per saham, atau dengan value amounting to US$5,786 which has been
total nilai nominal sebesar AS$5.786 yang telah issued by AI and subscribed to by EGATi. The total
dikeluarkan oleh AI dan disetorkan oleh EGATi. value of the transaction is US$325,000. EGATi paid
Jumlah nilai transaksi adalah AS$325.000. EGATi the amount of US$163,500 on the Closing Date and
membayar sebesar AS$163.500 pada saat Tanggal the remaining amount (“Deferred Consideration”) will
Penutupan dan sisanya (“Pembayaran yang be paid subject to meeting certain conditions.
Ditangguhkan”) akan dibayarkan pada saat kondisi
tertentu telah terpenuhi.
Pada tanggal 31 Desember 2023, Grup mencatat As at 31 December 2023, Group recognised
tambahan Pembayaran yang Ditangguhkan dari additional Deferred Consideration from EGATi as
EGATi sebagai selisih transaksi dengan pihak non- difference in value from transactions with non-
pengendali sebesar AS$2.900, karena kondisi tertentu controlling interest amounted to US$2,900, due to
dalam Perjanjian Pengambilan Saham Baru di atas certain conditions on the Subscription Agreement
telah dipenuhi selama tahun tersebut dan menerima above being fulfilled during the years and AI has
Pembayaran yang Ditangguhkan dari EGATi sebesar received Deferred Consideration Payments from
AS$15.400. Tidak ada pengakuan tambahan EGATi amounted to US$15,400. No more additional
pembayaran yang ditangguhkan yang diakui pada deferred consideration were recognised as at
tanggal 31 Desember 2024 karena Perusahaan secara 31 December 2024, due to the Company has
efektif telah menjual sebagian besar kepemilikan effectively sold mostly of its share ownership in
saham di Adaro sehingga Perusahaan menghentikan Adaro therefore the Company has derecognised
pengakuan Grup Adaro dan menyajikannya sebagai Adaro Group and presents it as discontinued
operasi yang dihentikan. operation.
Sampai dengan 31 Desember 2023, saldo sisa atas Up to 31 December 2023, remaining amount for
Pembayaran yang Ditangguhkan sebesar AS$66.600 Deferred Consideration amounted to US$66,600 is
disajikan sebagai piutang lain-lain pada laporan posisi presented as other receivables in the consolidated
keuangan konsolidasian (Catatan 7b) dan akan statement of financial position (Note 7b) and will be
dibayarkan berdasarkan Perjanjian Pengambilan paid in accordance with the Subscription Agreement.
Saham Baru.
Page 127
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/106 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
26. SALDO LABA 26. RETAINED EARNINGS
Belum
Dicadangkan/ dicadangkan/
Appropriated Unappropriated Total
Saldo pada tanggal Balance as at
1 Januari 2023 68,588 4,412,865 4,481,453 1 January 2023
Laba tahun berjalan yang Profit for the year
dapat diatribusikan kepada attributable to owners
pemilik entitas induk - 1,641,437 1,641,437 of the parent entity
Pengukuran kembali Remeasurement of
liabilitas imbalan pasca post employment
kerja, setelah pajak - (2,740) (2,740) benefit, net of tax
Dividen (Catatan 27) - (900,000) (900,000) Dividends (Note 27)
Saldo pada tanggal Balance as at
31 Desember 2023 68,588 5,151,562 5,220,150 31 December 2023
Laba tahun berjalan yang Profit for the year
dapat diatribusikan kepada attributable to owners
pemilik entitas induk - 1,380,013 1,380,013 of the parent entity
Pengukuran kembali Remeasurement of
liabilitas imbalan pasca post employment
kerja, setelah pajak - 2,664 2,664 benefit, net of tax
Dividen (Catatan 27) - (3,229,396) (3,229,396) Dividends (Note 27)
Penjualan entitas anak Sales of subsidiary
kepada entitas to entity under
sepengendali - 21,109 21,109 common control
Saldo pada tanggal Balance as at
31 Desember 2024 68,588 3,325,952 3,394,540 31 December 2024
Undang-Undang Perseroan Terbatas Republik The Limited Liability Company Law of the Republic
Indonesia No. 40/2007 (“UU No. 40/2007”) yang of Indonesia No. 40/2007 (“UU No. 40/2007”), issued
dikeluarkan di bulan Agustus 2007, mengharuskan in August 2007, requires the establishment of a
pembentukan cadangan umum dari laba bersih general reserve from net income amounting to at
sejumlah minimal 20% dari jumlah modal yang least 20% of a company’s issued and paid-up
ditempatkan dan disetor penuh. Cadangan umum ini capital. This general reserve is presented as
disajikan sebagai saldo laba dicadangkan pada appropriated retained earnings in the consolidated
laporan posisi keuangan konsolidasian. statements of financial position.
Tidak ada batasan waktu untuk membentuk cadangan There is no time limit on the establishment of the
tersebut. Perusahaan telah melakukan penyisihan reserve. The Company has set aside net profit up to
laba bersih sampai cadangan mencapai 20% dari the required reserve of 20% of the Company’s
jumlah modal yang ditempatkan dan disetor issued and paid-up capital as stipulated in Law No.
Perusahaan sebagaimana diatur dalam 40/2007.
UU No. 40/2007.
27. DIVIDEN 27. DIVIDENDS
Pada Rapat Dewan Komisaris dan Direksi Perusahaan At the Company’s Boards of Commissioners and
yang diadakan pada tanggal 16 Desember 2024, telah Directors meeting held on 16 December 2024,
disetujui pembayaran dividen tunai interim untuk tahun interim cash dividends for 2024 of US$200,000
2024 sejumlah AS$200.000 (AS$0,00661/saham - (US$0.00661/share - full amount) were approved.
nilai penuh). Dividen tunai interim ini telah dibayarkan The interim cash dividends were paid on 15 January
pada tanggal 15 Januari 2025. 2025.
Pada Rapat Umum Pemegang Saham Luar Biasa At the Company’s Extraordinary General Meeting of
(“RUPSLB”) Perusahaan yang diadakan pada tanggal Shareholders (“EGMS”) held on 18 November 2024,
18 November 2024, telah disetujui pembagian total additional cash dividends for 2023 of
tambahan dividen tunai final untuk tahun 2023 US$2,629,396 (US$0.08548/share - full amount)
sejumlah AS$2.629.326 (AS$0,08548/saham - nilai were approved. The additional final cash dividends
penuh). Tambahan dividen tunai final tahun 2023 ini for 2023 were paid on 6 December 2024.
telah dibayarkan pada tanggal 6 Desember 2024.
Page 128
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/107 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
27. DIVIDEN (lanjutan) 27. DIVIDENDS (continued)
Pada RUPST Perusahaan yang diadakan pada At the Company’s AGMS held on 15 May 2024, total
tanggal 15 Mei 2024, telah disetujui pembagian dividen cash dividends for 2023 of US$400,000
tunai final untuk tahun 2023 sejumlah AS$400.000 (US$0.013/share - full amount) were approved. The
(AS$0,013/saham - nilai penuh). Dividen tunai final final cash dividends for 2023 were paid on 5 June
tahun 2023 ini telah dibayarkan pada tanggal 5 Juni 2024.
2024.
Pada tanggal 31 Desember 2024, utang dividen As at 31 December 2024, dividends payable
merupakan utang dividen kepada pemegang saham represent the Company’s dividends payable to
Perusahaan sebesar AS$200.000 (2023: utang shareholders amounting to US$200,000
dividen kepada pemegang saham Perusahaan (2023: dividends payable consists of the Company’s
sebesar AS$400.000 dan utang dividen AI, SCM and dividends payable to shareholders amounting to
LSA kepada pihak non-pengendali dengan total US$400,000 and AI’s, SCM’s and LSA’s dividends
sebesar AS$29.510). payable to non-controlling interests totalling to
US$29,510).
Pada Rapat Dewan Komisaris dan Direksi Perusahaan At the Company’s Boards of Commissioners and
yang diadakan pada tanggal 14 Desember 2023, telah Directors meeting held on 14 December 2023,
disetujui pembayaran dividen tunai interim untuk tahun interim cash dividends for 2023 of US$400,000
2023 sejumlah AS$400.000 (AS$0,01295/saham - (US$0.01295/share - full amount) were approved.
nilai penuh). Dividen tunai interim ini telah dibayarkan The interim cash dividends were paid on 12 January
pada tanggal 12 Januari 2024. 2024.
Pada RUPST Perusahaan yang diadakan pada At the Company’s AGMS held on 11 May 2023, total
tanggal 11 Mei 2023, telah disetujui pembagian dividen cash dividends for 2022 of US$500,000
tunai final untuk tahun 2022 sejumlah AS$500.000 (US$0.01618/share - full amount) were approved.
(AS$0,01618/saham - nilai penuh). Dividen tunai final The final cash dividends for 2022 were paid on 5
tahun 2022 ini telah dibayarkan pada tanggal 5 Juni June 2023.
2023.
Pada Rapat Dewan Komisaris dan Direksi Perusahaan At the Company’s Boards of Commissioners and
yang diadakan pada tanggal 21 Desember 2022, telah Directors meeting held on 21 December 2022,
disetujui pembayaran dividen tunai interim untuk tahun interim cash dividends for 2022 of US$500,000
2022 sejumlah AS$500.000 (AS$0,01613/saham - (US$0.01613/share - full amount) were approved.
nilai penuh). Dividen tunai interim ini telah dibayarkan The interim cash dividends were paid on 13 January
pada tanggal 13 Januari 2023. 2023.
28. KEPENTINGAN NON-PENGENDALI 28. NON-CONTROLLING INTERESTS
2024
Penerbitan
saham entitas Penghentian
anak kepada Bagian atas pengakuan
kepentingan penghasilan/ atas dampak
non-pengendali/ (kerugian) operasi yang
Issuance of komprehensif dihentikan/
subsidiaries’ Kehilangan Bagian atas lain/ Derecognition Saldo
Saldo awal/ shares to pengendalian/ laba neto/ Share in other due to akhir/
Beginning non-controlling Loss Share in comprehensive Dividen/ discontinued Ending
balance interests of control net profit income/(loss) Dividends operations balance
AMI 158,346 - - 70,399 (285) - - 228,460
AP - - - 612 3,296 - 123,476 127,384
AI 128,119 - - 60,277 66 (90,951) (97,511) -
Adaro (selain/other than AI) 288,977 - (304) 48,505 373 (64,672) (272,879) -
Lain-lain (masing-masing dibawah
AS$100.000)/Others (each
below US$100,000) 60,644 31,115 - (3,674) (3) - 50 88,132
Total 636,086 31,115 (304) 176,119 3,447 (155,623) (246,864) 443,976
Page 129
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/108 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
28. KEPENTINGAN NON-PENGENDALI (lanjutan) 28. NON-CONTROLLING INTERESTS (continued)
2023
Penerbitan
saham entitas
anak kepada Bagian atas
kepentingan penghasilan/
non-pengendali/ Akuisisi (kerugian)
Issuance of kepentingan komprehensif
subsidiaries’ non-pengendali/ Bagian atas lain/Share in Saldo
Saldo awal/ shares to Acquisition of laba neto/ other akhir/
Beginning non-controlling non-controlling Share in net comprehensive Dividen/ Ending
balance interests interests profit income/(loss) Dividends balance
AI 114,026 - - 83,358 (68) (69,197) 128,119
AMI 86,934 - - 71,414 (2) - 158,346
Lain-lain (masing-masing dibawah
AS$100.000)/Others (each
below US$100,000) 301,778 48,571 (1,129) 58,669 1,251 (59,519) 349,621
Total 502,738 48,571 (1,129) 213,441 1,181 (128,716) 636,086
29. PENDAPATAN USAHA 29. REVENUE
2024 2023
Pihak ketiga: Third parties:
Penjualan batubara Sales of coal
Ekspor 333,120 459,900 Export
Domestik 366,536 139,966 Domestic
Sub-total 699,656 599,866 Sub-total
Jasa pertambangan Mining services
Domestik Domestic
Jasa pertambangan - 140,776 Mining services
Jasa sewa - 93 Rental services
Sub-total - 140,869 Sub-total
Lain-lain Others
Domestik 4,244 - Domestic
Sub-total 703,900 740,735 Sub-total
Pihak berelasi: Related parties:
Penjualan batubara Sales of coal
Ekspor 452,284 484,138 Export
Jasa pertambangan Mining services
Domestik Domestic
Jasa pertambangan 845,391 833,937 Mining services
Jasa sewa 142 177 Rental services
Lain-lain 3,237 - Others
Sub-total 848,770 834,114 Sub-total
Lain-lain Others
Domestik 73,735 76,425 Domestic
Sub-total 1,374,789 1,394,677 Sub-total
Total 2,078,689 2,135,412 Total
Rincian pelanggan yang memiliki transaksi Details of customers with revenue transactions that
pendapatan lebih dari 10% dari total pendapatan represent more than 10% of the total consolidated
usaha konsolidasian untuk tahun yang berakhir pada revenue for the years ended 31 December 2024 and
tanggal 31 Desember 2024 dan 2023 adalah sebagai 2023 are as follows:
berikut:
2024 2023
Pihak berelasi: Related parties:
AI 756,054 757,162 AI
AIS 452,284 484,138 AIS
Lihat Catatan 34 untuk informasi rincian transaksi dan Refer to Note 34 for information on the details of
saldo dengan pihak berelasi. transactions and balances with related parties.
Page 130
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/109 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
30. BEBAN POKOK PENDAPATAN 30. COST OF REVENUE
2024 2023
Jasa pertambangan Mining services
Perbaikan dan pemeliharaan 160,032 174,999 Repairs and maintenance
Penyusutan (Catatan 10) 152,342 153,157 Depreciation (Note 10)
Pemakaian bahan 134,573 231,981 Consumables usage
Biaya karyawan 108,130 112,198 Employee costs
Subkontraktor 45,348 44,759 Subcontractors
Lain-lain 41,238 53,812 Others
Total beban pokok pendapatan -
jasa pertambangan 641,663 770,906 Total cost of revenue - mining services
Penjualan batubara Sales of coal
Royalti kepada Pemerintah 146,987 158,233 Royalties to Government
Pertambangan 146,933 116,142 Mining
Pengangkutan dan
bongkar muat 134,816 116,589 Freight and handling costs
Pemrosesan batubara 47,869 38,691 Coal processing
Penyusutan (Catatan 10) 44,817 43,388 Depreciation (Note 10)
Amortisasi properti Amortisation of
pertambangan 16,044 12,498 mining properties
Biaya reklamasi dan penutupan Mine reclamation and
tambang 5,050 1,804 closure costs
Persediaan batubara: Coal inventory
Saldo awal 48,637 40,993 Beginning balance
Saldo akhir (47,491) (48,637) Ending balance
Lain-lain - 231 Others
Total beban pokok pendapatan -
penjualan batubara 543,662 479,932 Total cost of revenue - sales of coal
Lain-lain Others
Penyusutan (Catatan 10) 9,401 8,590 Depreciation (Note 10)
Pemakaian bahan 5,538 6,953 Consumables
Jasa perbaikan dan
pemeliharaan 1,230 1,106 Repairs and maintenance
Lain-lain 3,196 244 Others
Total beban pokok pendapatan -
lain-lain 19,365 16,893 Total cost of revenue - others
Total 1,204,690 1,267,731 Total
Tidak ada transaksi pembelian kepada satu pemasok There were no purchase transactions made with any
dengan total transaksi kumulatif lebih dari 10% dari single supplier with a cumulative amount exceeding
total pendapatan usaha konsolidasian untuk tahun 10% of the total consolidated revenue for the years
yang berakhir pada tanggal 31 Desember 2024 dan ended 31 December 2024 and 2023.
2023.
Page 131
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/110 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
31. BEBAN USAHA 31. OPERATING EXPENSES
2024 2023
Penjualan dan pemasaran Selling and marketing
Komisi penjualan 10,038 13,760 Sales commission
Umum dan administrasi General and administrative
Biaya karyawan 77,750 70,249 Employee costs
Jasa profesional 15,852 5,956 Professional fees
Beban kantor 8,692 5,075 Office expenses
Penyusutan (Catatan 10) 3,591 4,893 Depreciation (Note 10)
Pajak final 823 474 Final tax
Penambahan cadangan untuk
pembayaran penetapan Addition of allowance
Pemerintah for Government
(Catatan 41n) - 8,508 charges (Note 41n)
Pembalikan cadangan untuk
pembayaran penetapan Reversal of allowance
Pemerintah for Government
(Catatan 41n) - (35,916) charges (Note 41n)
Lain-lain 23,611 20,946 Others
Sub-total 130,319 80,185 Sub-total
Total 140,357 93,945 Total
32. BEBAN LAIN-LAIN, NETO 32. OTHER EXPENSES, NET
2024 2023
Kerugian selisih kurs, neto (13,481) (13,458) Foreign exchange losses, net
Keuntungan/(kerugian)
atas pelepasan Gain/(loss) on disposal
aset tetap (Catatan 10) 1,160 (2,755) of fixed assets (Note 10)
Lain-lain (9,920) 7,412 Others
Total, neto (22,241) (8,801) Total, net
33. PERPAJAKAN 33. TAXATION
a. Pajak dibayar dimuka a. Prepaid taxes
2024 2023
PPN 50,820 101,193 VAT
PPh Badan 10,840 18,169 CIT
Total 61,660 119,362 Total
Dikurangi: bagian lancar 27,514 103,641 Less: current portion
Bagian tidak lancar 34,146 15,721 Non-current portion
Page 132
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/111 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
33. PERPAJAKAN (lanjutan) 33. TAXATION (continued)
b. Pajak yang bisa dipulihkan kembali b. Recoverable taxes
2024 2023
Piutang Pajak Bahan Bakar
Kendaraan Bermotor
(“PBBKB”) - 39,196 Vehicle fuel tax (“PBBKB”) receivables
Piutang PBBKB merupakan saldo PBBKB yang The PBBKB receivables represent the balance
dapat dikompensasi kepada Pemerintah. of PBBKB that is reimbursable by the
Pemerintah telah menetapkan bahwa PBBKB Government. The Government has confirmed
merupakan pajak baru. Oleh karena itu, pajak ini that PBBKB is a new tax. Therefore, it is
dapat dikompensasi menurut PKP2B. Sebagai reimbursable according to the provisions of the
tambahan, berdasarkan Amandemen PKP2B CCA. In addition, based on the Amendment to
(Catatan 1c), dalam hal AI membayar PBBKB, AI the CCA (Note 1c), in the case of AI paying
dapat melakukan kompensasi PBBKB dimaksud PBBKB, AI is allowed to offset PBBKB against
terhadap bagian Pemerintah sebesar 13,5% the Government’s share of 13.5% at the
paling cepat 60 hari setelah dilakukan soonest 60 days after payment of that PBBKB
pembayaran PBBKB dimaksud oleh AI. is made by AI. Based on the IUPK for the
Berdasarkan IUPK sebagai Kelanjutan Operasi Continuation of Contract/Agreement
Kontrak/Perjanjian, PBBKB yang dibayarkan Operation, the PBBKB paid until the end of
sampai dengan akhir tahun pajak 2022 masih 2022 fiscal year is still allowed to be offset
diperbolehkan untuk dikompensasi terhadap against the Government’s share.
bagian Pemerintah.
Berdasarkan Berita Acara Verifikasi dari KESDM, Based on the Minutes of Verification Result,
KESDM telah setuju bahwa AI dapat melakukan MoEMR agreed that AI can offset PBBKB to
kompensasi piutang PBBKB terhadap royalty payments that are AI obligations from
pembayaran royalti yang menjadi kewajiban AI the future coal sales amounted to
dari penjualan batubara mendatang sebesar Rp405,054,689,941 (full amount) (or
Rp405.054.689.941(nilai penuh) (atau setara equivalent to US$27,666). During 2024, AI had
dengan AS$27.666). Selama tahun 2024, AI offset PBBKB against royalty payments with
telah melakukan kompensasi piutang PBBKB the amount approved by the government
terhadap pembayaran royalti sebesar nilai yang mentioned above and the remaining balance is
disetujui pemerintah tersebut dan sisanya recorded as part of the cost of sales and other
dibebankan sebagai bagian dari harga pokok expense, net in the statement of profit or loss.
pendapatan dan beban lain-lain, neto dalam
laporan laba rugi.
c. Utang pajak c. Taxes payable
2024 2023
PPh Badan 17,447 86,345 CIT
Pajak lain-lain: Other taxes:
- PPN 5,986 10,140 VAT -
- Pajak penghasilan Income tax articles -
pasal 23 dan 26 1,026 14,444 23 and 26
- Lain-lain 1,160 3,300 Others -
Sub-total 8,172 27,884 Sub-total
Total 25,619 114,229 Total
Page 133
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/112 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
33. PERPAJAKAN (lanjutan) 33. TAXATION (continued)
d. Beban pajak penghasilan d. Income tax expense
2024 2023
Pajak penghasilan kini 173,667 164,943 Current income tax
Pajak penghasilan
tangguhan (3,627) (9,580) Deferred income tax
Beban pajak dari
penyesuaian pajak Income tax expense from prior year
tahun sebelumnya 2,296 9,919 tax adjustments
Total beban pajak
penghasilan Total consolidated
konsolidasian 172,336 165,282 income tax expense
Pajak atas laba sebelum pajak penghasilan The tax on consolidated profit before income
konsolidasian berbeda dengan jumlah teoritis tax differs from the theoretical amount that
yang dihitung menggunakan rata-rata tertimbang would arise using the weighted average tax
tarif pajak yang berlaku atas laba masing-masing rate applicable to profits of the consolidated
entitas anak yang dikonsolidasi sebagai berikut: subsidiaries as follows:
2024 2023
Laba sebelum
pajak penghasilan Consolidated profit before
konsolidasian 809,820 818,588 income tax
Pajak dihitung dengan tarif Tax calculated at
pajak yang berlaku 188,116 171,972 applicable tax rates
Penghasilan yang telah
dikenakan pajak final (13,068) (6,919) Income subject to final tax
Beban yang tidak dapat
dikurangkan menurut
pajak 4,456 7,767 Non-deductible expenses
Hasil pemeriksaan pajak - (625) Tax audit assessments
Lain-lain (7,168) (6,913) Others
Beban pajak penghasilan Consolidated income
konsolidasian 172,336 165,282 tax expense
Page 134
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/113 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
33. PERPAJAKAN (lanjutan) 33. TAXATION (continued)
d. Beban pajak penghasilan (lanjutan) d. Income tax expense (continued)
Rekonsiliasi antara laba sebelum pajak The reconciliation between the consolidated
penghasilan konsolidasian dengan estimasi profit before income tax and estimated
penghasilan kena pajak konsolidasian adalah consolidated taxable income is as follows:
sebagai berikut:
2024 2023
Laba sebelum
pajak penghasilan Consolidated profit before
konsolidasian 809,820 818,588 income tax
Dikurangi: Less:
Laba sebelum pajak
penghasilan - Profit before income tax -
Entitas anak (839,480) (793,330) Subsidiaries
Disesuaikan dengan jurnal Adjustment for consolidation
eliminasi konsolidasian 50,541 (13,380) elimination entries
Laba sebelum pajak
penghasilan - Profit before income tax -
Perusahaan 20,881 11,878 the Company
Koreksi fiskal: Fiscal corrections:
Penghasilan yang telah
dikenakan pajak final (29,332) (1,432) Income subject to final tax
Beban yang tidak dapat
dikurangkan
menurut pajak 32,702 10,988 Non-deductible expenses
Lain-lain 8,050 - Others
Sub-total 11,420 9,556 Sub-total
Laba kena
pajak - Perusahaan 32,301 21,434 Taxable income - the Company
Pajak penghasilan kini - Current income tax -
Perusahaan 6,137 4,072 the Company
Pajak penghasilan kini - Current income tax -
Entitas anak 167,530 160,871 Subsidiaries
Pajak penghasilan kini Consolidated
konsolidasian 173,667 164,943 current income tax
Laba kena pajak hasil rekonsiliasi menjadi dasar The taxable income resulting from the
dalam pengisian Surat Pemberitahuan Tahunan reconciliation will become the basis for filing
PPh Badan. the Annual CIT Return.
Pajak penghasilan sehubungan dengan The income tax relating to other
penghasilan komprehensif lain selama tahun comprehensive income during the year is as
berjalan adalah sebagai berikut: follows:
2024 2023
Sebelum Sebelum
pajak/ Beban pajak/ Setelah pajak/ pajak/ Beban pajak/ Setelah pajak/
Before tax Tax charges After tax Before tax Tax charges After tax
Liabilitas imbalan Post-employment
pasca kerja 3,519 (742) 2,777 (3,566) 713 (2,853) benefits liabilities
Page 135
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/114 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
33. PERPAJAKAN (lanjutan) 33. TAXATION (continued)
e. Aset/(liabilitas) pajak tangguhan e. Deferred tax assets/(liabilities)
2024
Penghentian
Ditransfer pengakuan
Dikreditkan/ ke/dari aset/ atas
(dibebankan) (liabilitas) dampak
pada pajak operasi yang
laba rugi/ tangguhan/ dihentikan/
Credited/ Dibebankan Transfer to/ Derecognition
Saldo awal/ (charged) to pada ekuitas/ from deferred of Saldo akhir/
Beginning profit or Charged to tax assets/ discontinued Ending
balance loss equity (liabilities) operations balance
Aset pajak tangguhan Deferred tax assets
Aset tetap 7,501 2,731 - 4,423 (1,097) 13,558 Fixed assets
Liabilitas imbalan pasca Post-employment benefits
kerja 13,546 (161) (713) (70) (4,409) 8,193 liabilities
Properti pertambangan 32,262 (7,005) - - (25,257) - Mining properties
Liabilitas sewa 21,980 (2,046) - - (81) 19,853 Lease liabilities
Penyisihan kerugian Loss allowances
piutang usaha 3,591 (206) - - (3,385) - of trade receivables
Rugi fiskal yang dibawa Tax losses carried
ke masa depan - 6,638 - (6,638) - - forward
Provisi pembongkaran, Provision for
rehabilitasi, dan penutupan decommissioning, mine
tambang 6,407 (1,110) - - (5,297) - rehabilitation and closure
Lain-lain 205 3,479 - (70) (274) 3,340 Others
Aset pajak tangguhan - Deferred tax assets at
akhir tahun 85,492 2,320 (713) (2,355) (39,800) 44,944 the end of the year
Liabilitas pajak tangguhan Deferred tax liabilities
Properti pertambangan (142,728) 7,928 - - 56,099 (78,701) Mining properties
Aset tetap (12,951) (1,354) - (4,423) 3,285 (15,443) Fixed assets
Liabilitas sewa 414 (1,041) - - (33) (660) Lease liabilities
Penyisihan kerugian Loss allowances
piutang usaha 52 25 - - (77) - of trade receivables
Biaya pinjaman yang Capitalised borrowing
dikapitalisasi (3,322) 221 - - - (3,101) cost
Cadangan untuk pembayaran
penetapan Allowance for
pemerintah 1,714 (1,714) - - - - government charges
Liabilitas imbalan pasca Post-employment benefits
kerja 1,081 (180) (29) 70 (62) 880 liabilities
Lain-lain 208 (4,196) - 6,708 (351) 2,369 Others
Liabilitas pajak tangguhan - Deferred tax liabilities at
akhir tahun (155,532) (311) (29) 2,355 58,861 (94,656) the end of the year
2023
Dikreditkan/ Ditransfer ke/
(dibebankan) dari aset/
pada (liabilitas) pajak
laba rugi/ tangguhan/
Credited/ Dikreditkan Transfer to/
Saldo awal/ (charged) to pada ekuitas/ from deferred Saldo akhir/
Beginning profit or Credited to tax assets/ Ending
balance loss equity (liabilities) balance
Aset pajak tangguhan Deferred tax assets
Aset tetap 7,068 123 - 310 7,501 Fixed assets
Liabilitas imbalan pasca Post-employment benefits
kerja 11,357 1,440 664 85 13,546 liabilities
Properti pertambangan 38,890 (6,498) - (130) 32,262 Mining properties
Liabilitas sewa 13,502 8,446 - 32 21,980 Lease liabilities
Penyisihan kerugian Loss allowances
piutang usaha 2,321 1,270 - - 3,591 of trade receivables
Rugi fiskal yang dibawa Tax losses carried
ke masa depan 16 (16) - - - forward
Provisi pembongkaran, Provision for
rehabilitasi, dan penutupan decommissioning, mine
tambang 7,894 (1,619) - 132 6,407 rehabilitation and closure
Lain-lain 215 (16) - 6 205 Others
Aset pajak tangguhan - Deferred tax assets at
akhir tahun 81,263 3,130 664 435 85,492 the end of the year
Liabilitas pajak tangguhan Deferred tax liabilities
Properti pertambangan (150,958) 8,100 - 130 (142,728) Mining properties
Aset tetap (9,552) (3,089) - (310) (12,951) Fixed assets
Liabilitas sewa (602) 1,048 - (32) 414 Lease liabilities
Penyisihan kerugian Loss allowances
piutang usaha 19 33 - - 52 of trade receivables
Biaya pinjaman yang Capitalised borrowing
dikapitalisasi (3,543) 221 - - (3,322) cost
Cadangan untuk pembayaran
penetapan Allowance for
pemerintah - 1,714 - - 1,714 government charges
Liabilitas imbalan pasca Post-employment benefits
kerja 961 156 49 (85) 1,081 liabilities
Provisi pembongkaran, Provision for
rehabilitasi, dan penutupan decommissioning, mine
tambang 102 30 - (132) - rehabilitation and closure
Lain-lain 163 51 - (6) 208 Others
Liabilitas pajak tangguhan Deferred tax liabilities at
akhir tahun (163,410) 8,264 49 (435) (155,532) the end of the year
Page 136
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/115 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
33. PERPAJAKAN (lanjutan) 33. TAXATION (continued)
e. Aset/(liabilitas) pajak tangguhan (lanjutan) e. Deferred tax assets/(liabilities) (continued)
Beberapa entitas anak dalam posisi rugi dan Several subsidiaries are in a loss position and
hanya berfungsi sebagai kantor pusat saja, only function as head offices, so there is a
sehingga terdapat pembatasan pemakaian rugi limitation on the future use of tax losses carried
fiskal yang dibawa ke masa depan dan forward and also uncertainty as to whether the
ketidakpastian apakah aset pajak tangguhan ini deferred tax assets will be realised. Thus, a
dapat terealisasi. Karena itu, terdapat aset pajak portion of the deferred tax assets relating to tax
tangguhan yang berkaitan dengan rugi fiskal losses carried forward and post-employment
yang dibawa ke masa depan dan liabilitas benefits liabilities has not been recognised in
imbalan pasca kerja yang tidak diakui di dalam these consolidated financial statements.
laporan keuangan konsolidasian ini.
Analisis aset pajak tangguhan adalah sebagai The analysis of deferred tax assets is as
berikut: follows:
2024 2023
Aset pajak tangguhan
yang akan dipulihkan Deferred tax assets to be recovered
dalam 12 bulan 2,666 11,526 within 12 months
Aset pajak tangguhan
yang akan dipulihkan Deferred tax assets to be recovered
setelah 12 bulan 42,278 73,966 after 12 months
Total 44,944 85,492 Total
Manajemen berpendapat jika aset pajak Management believes that the deferred tax
tangguhan dapat dipulihkan sesuai dengan assets could be recovered within the expected
periode realisasi yang diekspektasikan. realisation period.
Analisis liabilitas pajak tangguhan adalah The analysis of deferred tax liabilities is as
sebagai berikut: follows:
2024 2023
Liabilitas pajak tangguhan
yang akan diselesaikan Deferred tax liabilities to be settled
dalam 12 bulan 167 7,980 within 12 months
Liabilitas pajak tangguhan
yang akan diselesaikan Deferred tax liabilities to be settled
setelah 12 bulan 94,489 147,552 after 12 months
Total 94,656 155,532 Total
f. Administrasi f. Administration
Berdasarkan undang-undang perpajakan yang Under the taxation laws of Indonesia,
berlaku di Indonesia, perusahaan-perusahaan di companies within the Group that are domiciled
dalam Grup yang berdomisili di Indonesia, in Indonesia, calculate and pay tax on the
menghitung dan membayar sendiri besarnya basis of self assessment. The DGT may
jumlah pajak yang terutang. DJP dapat assess or amend taxes within five years from
menetapkan atau mengubah pajak dalam batas when the tax becomes due.
waktu lima tahun sejak saat terutangnya pajak.
g. Surat ketetapan pajak g. Tax assessment letters
Audit pajak Grup Tax audits of the Group
Sampai dengan tanggal laporan keuangan As at the completion date of these
konsolidasian ini diterbitkan, ATBI dan ACEI consolidated financial statements, ATBI and
sedang diaudit DJP berkaitan dengan semua ACEI are being audited by the DGT for all
jenis pajak untuk tahun pajak 2023. Entitas- types of taxes for fiscal year 2023. These
entitas ini belum menerima hasil audit pajak entities have not yet received the tax audit
tersebut. Manajemen berpendapat bahwa hasil results. Management is of the opinion that the
audit pajak tersebut tidak akan berdampak tax audit results will not have a material impact
material terhadap laporan keuangan on the Group’s consolidated financial
konsolidasian Grup secara material. statements.
Page 137
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/116 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
33. PERPAJAKAN (lanjutan) 33. TAXATION (continued)
h. Tarif pajak h. Tax rates
Perusahaan Terbuka yang memenuhi syarat- Publicly Listed Companies that fulfil certain
syarat tertentu dapat memperoleh tarif 3% lebih requirements are entitled to obtain a rate 3%
rendah dari tarif PPh Badan yang berlaku. Dalam lower than the applicable CIT rate. In the event
hal Perusahaan memenuhi syarat-syarat that the Company fulfils the requirements, the
tersebut, Perusahaan dapat memperoleh tarif Company can obtain a lower CIT rate for the
PPh Badan lebih rendah untuk Tahun Pajak yang relevant Fiscal Year.
bersangkutan.
34. TRANSAKSI DAN SALDO DENGAN PIHAK 34. TRANSACTIONS AND BALANCES WITH
BERELASI RELATED PARTIES
a. Sifat hubungan a. Nature of relationships
Pihak berelasi/ Sifat hubungan/ Jenis transaksi/
Related parties Nature of relationships Type of transactions
ASI Pemegang saham mayoritas/Majority shareholder Setoran modal/paid-up capital
AIS Entitas sepengendali/Entity under common control Penjualan batubara/Sales of coal
(2023: entitas anak/subsidiary)
BPI Ventura bersama/joint venture Penjualan batubara dan pinjaman untuk pihak berelasi/
Sales of coal and loans to related parties
TPI Ventura bersama/joint venture Penjualan batubara/Sales of coal
SCM Entitas sepengendali/Entity under common control Jasa pertambangan/Mining services
(2023: entitas anak/subsidiary)
LSA Entitas sepengendali/Entity under common control Jasa pertambangan/Mining services
(2023: entitas anak/subsidiary)
PCS Entitas sepengendali/Entity under common control Jasa pertambangan/Mining services
(2023: entitas anak/subsidiary)
AI Entitas sepengendali/Entity under common control Jasa pertambangan/Mining services
(2023: entitas anak/subsidiary)
PC Entitas sepengendali/Entity under common control Jasa lainnya/Other services
(2023: entitas anak/subsidiary)
Adaro Entitas sepengendali/Entity under common control Pinjaman kepada pihak berelasi dan pendapatan bunga/
(2023: entitas anak/subsidiary) Loans to related parties and interest income
ATS Entitas sepengendali/Entity under common control Jasa lainnya dan pinjaman untuk pihak berelasi/
(2023: entitas anak/subsidiary) Other services and loans to related parties
Tala Alam Baru (“TAB”) Pihak berelasi lainnya/Other related party Pinjaman untuk pihak berelasi/Loans to related parties
GTM Entitas sepengendali/Entity under common control Jasa lainnya dan pinjaman untuk pihak berelasi/
(2023: ventura bersama/joint venture) Other services and loans to related parties
MBP Entitas sepengendali/Entity under common control Jasa lainnya/Other services
(2023: entitas anak/subsidiary)
IBT Entitas sepengendali/Entity under common control Jasa lainnya/Other services
(2023: entitas anak/subsidiary)
HBI Entitas sepengendali/Entity under common control Jasa lainnya/Other services
(2023: entitas anak/subsidiary)
AL Entitas sepengendali/Entity under common control Jasa lainnya/Other services
(2023: entitas anak/subsidiary)
APM Entitas sepengendali/Entity under common control Jasa lainnya/Other services
(2023: entitas anak/subsidiary)
MIP Entitas sepengendali/Entity under common control Pendapatan bunga/Interest income
(2023: entitas anak/subsidiary)
Personil manajemen kunci/ Direktur dan Komisaris Grup/ Kompensasi/Compensation
Key management Directors and Commissioners of the Group
personnel
Page 138
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/117 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
34. TRANSAKSI DAN SALDO DENGAN PIHAK 34. TRANSACTIONS AND BALANCES WITH
BERELASI RELATED PARTIES
b. Rincian transaksi dan saldo b. Details of transactions and balances
Dalam kegiatan usahanya, Grup mengadakan In the normal course of business, the Group
transaksi dengan pihak-pihak berelasi, terutama engages in transactions with related parties,
meliputi transaksi-transaksi pembelian barang primarily consisting of purchases of goods and
dan jasa dan transaksi keuangan lainnya. services and other financial transactions.
2024 2023
Piutang usaha (Catatan 7a) Trade receivables (Note 7a)
AI 191,917 - AI
AIS 50,161 - AIS
SCM 24,975 - SCM
LSA 23,646 - LSA
PCS 12,274 - PCS
PC 1,002 - PC
BPI - 45,396 BPI
TPI - 20,856 TPI
Lain-lain 1,779 451 Others
Total 305,754 66,703 Total
Persentase terhadap As a percentage of
total aset konsolidasian 4.56% 0.64% total consolidated assets
Piutang lain-lain (Catatan 7b) Other receivables (Note 7b)
BPI 35,949 25,944 BPI
AI 8,963 - AI
Lain-lain 1,809 152 Others
Total 46,721 26,096 Total
Dikurangi: bagian lancar 7,751 152 Less: current portion
Bagian tidak lancar 38,970 25,944 Non-current portion
Persentase terhadap As a percentage of
total aset konsolidasian 0.70% 0.25% total consolidated assets
Pinjaman untuk pihak
berelasi Loans to related parties
Adaro 761,300 - Adaro
BPI 140,594 140,594 BPI
ATS 15,035 - ATS
TAB 2,176 - TAB
GTM - 3,043 GTM
Total 919,105 143,637 Total
Dikurangi: bagian lancar 2,176 - Less: current portion
Bagian tidak lancar 916,929 143,637 Non-current portion
Persentase terhadap As a percentage of
total aset konsolidasian 13.71% 1.37% total consolidated assets
Utang usaha (Catatan 15) Trade payables (Note 15)
MBP 18,398 - MBP
IBT 1,712 - IBT
HBI 1,165 - HBI
Lain-lain 2,877 - Others
Total 24,152 - Total
Persentase terhadap
total liabilitas As a percentage of
konsolidasian 1.81% - total consolidated liabilities
Page 139
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/118 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
34. TRANSAKSI DAN SALDO DENGAN PIHAK 34. TRANSACTIONS AND BALANCES WITH
BERELASI (lanjutan) RELATED PARTIES (continued)
b. Rincian transaksi dan saldo (lanjutan) b. Details of transactions and balances
(continued)
2024 2023
Beban yang masih
harus dibayar Accrued expenses
MBP 15,015 - MBP
IBT 4,680 - IBT
Lain-lain 5,808 - Others
Total 25,503 - Total
Persentase terhadap
total liabilitas As a percentage of
konsolidasian 1.92% - total consolidated liabilities
Pada tanggal 24 Juni 2024, Perusahaan On 24 June 2024, the Company provided a
memberikan fasilitas pinjaman baru sebesar new loan facility of US$1,450,000 to Adaro.
AS$1.450.000 kepada Adaro. Pinjaman ini This loan bears interest at SOFR plus a certain
dikenakan bunga sebesar SOFR ditambah percentage per annum and is payable
persentase tertentu per tahun dan dibayar setiap quarterly. The facility will mature on
kuartal. Fasilitas ini akan jatuh tempo pada 31 December 2028. The outstanding loan
tanggal 31 Desember 2028. Jumlah saldo balance as at 31 December 2024 was
pinjaman yang terutang pada tanggal 31 US$761,300.
Desember 2024 sebesar AS$761.300.
Pada tanggal 25 Mei 2021, AP menandatangani On 25 May 2021, AP entered into a
Perjanjian Pinjaman Pemegang Saham dengan Shareholder Loan Agreement with BPI to
BPI untuk memberikan pinjaman kepada BPI provide a US$140,594 loan facility to BPI. This
sebesar AS$140.594. Perjanjian pinjaman ini loan agreement is in line with the Equity
sesuai dengan Perjanjian Dukungan Ekuitas Support Agreement dated 3 June 2016 in
tertanggal 3 Juni 2016 terkait proyek Central Java respect of the Central Java Power Plant
Power Plant (“CJPP”) (Catatan 41t) yang (“CJPP”) project (Note 41t) as signed by
ditandatangani antara lain oleh AP (sebagai among others AP (as Shareholder), the
Pemegang Saham), Perusahaan (sebagai Company (as Sponsor), Mizuho Bank, Ltd (as
Sponsor), Mizuho Bank, Ltd (sebagai Agen Global Facilities Agent) and MUFG Bank Ltd
Fasilitas Global) dan MUFG Bank Ltd (sebagai (as Offshore Security Agent).
Agen Jaminan Luar Negeri).
Pinjaman yang diberikan oleh AP tersebut tidak The loan provided by AP has no maturity date.
memiliki tanggal jatuh tempo, namun dapat However, it may be repaid at any time at AP’s
dilunasi kapan saja atas permintaan AP atau opsi request or at the option of BPI, provided
BPI, selama kewajiban-kewajiban keuangan certain financial covenants under senior
tertentu berdasarkan dokumen pembiayaan financing documents of BPI have been fulfilled.
senior BPI sudah terpenuhi. Pinjaman dimaksud The loan bears interest at a certain percentage
dikenakan bunga dengan persentase tertentu per per annum. This facility is not bound by any
tahun. Fasilitas ini tidak terikat dengan jaminan collateral.
apapun.
Manajemen Grup berpendapat bahwa The Group’s management is of the opinion that
penurunan nilai atas pinjaman untuk pihak the impairment of loans to related parties as at
berelasi pada tanggal 31 Desember 2024 dan 31 December 2024 and 2023 is not material.
2023 tidak material sehingga cadangan kerugian Therefore, provision for ECL is not considered
kredit ekspektasian tidak diperlukan. necessary.
Lihat Catatan 44(2) untuk informasi nilai wajar Refer to Note 44(2) for information on the fair
dari pinjaman untuk pihak berelasi pada tanggal value of loans to related parties as at
31 Desember 2024 dan 2023. 31 December 2024 and 2023.
Page 140
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/119 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
34. TRANSAKSI DAN SALDO DENGAN PIHAK 34. TRANSACTIONS AND BALANCES WITH
BERELASI (lanjutan) RELATED PARTIES (continued)
b. Rincian transaksi dan saldo (lanjutan) b. Details of transactions and balances
(continued)
2024 2023
Pendapatan usaha
(Catatan 29) Revenue (Note 29)
AI 756,054 757,162 AI
AIS 452,284 484,138 AIS
LSA 80,739 72,009 LSA
SCM 63,456 69,607 SCM
PCS 14,806 3,084 PCS
AL 2,446 - AL
Adaro 1,232 1,232 Adaro
PC 1,024 - PC
Lain-lain 2,748 7,445 Others
Total 1,374,789 1,394,677 Total
Persentase terhadap total
pendapatan usaha As a percentage of
konsolidasian 66.14% 65.31% total consolidated revenue
Beban pokok pendapatan
(Catatan 30) Cost of revenue (Note 30)
MBP 104,607 86,871 MBP
IBT 22,836 19,876 IBT
AI 3,705 3,279 AI
AL 3,498 1,398 AL
ATS 3,021 3,337 ATS
HBI 1,282 - HBI
Lain-lain 1,711 3,445 Others
Total 140,660 118,206 Total
Persentase terhadap total
beban pokok As a percentage of
pendapatan total consolidated
konsolidasian 11.68% 9.32% cost of revenue
Page 141
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/120 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
34. TRANSAKSI DAN SALDO DENGAN PIHAK 34. TRANSACTIONS AND BALANCES WITH
BERELASI (lanjutan) RELATED PARTIES (continued)
b. Rincian transaksi dan saldo (lanjutan) b. Details of transactions and balances
(continued)
2024 2023
Beban usaha (Catatan 31) Operating expenses (Note 31)
Penjualan dan pemasaran : Selling and marketing:
AIS 10,038 13,760 AIS
Umum dan administrasi: General and administrative:
APM 1,297 2,218 APM
Lain-lain 603 463 Others
Total 11,938 16,441 Total
Persentase terhadap total As a percentage of
beban usaha total consolidated
konsolidasian 8.51% 17.50% operating expenses
Penghasilan keuangan Finance income
Adaro 26,282 - Adaro
BPI 10,005 9,978 BPI
MIP 1,998 5,885 MIP
ATS 1,118 144 ATS
Lain-lain 333 137 Others
Total 39,736 16,144 Total
Persentase terhadap total
penghasilan keuangan As a percentage of total
konsolidasian 33.12% 24.42% consolidated finance income
Biaya keuangan Finance costs
Adaro 9,182 21,958 Adaro
Lain-lain - 730 Others
Total 9,182 22,688 Total
Persentase terhadap total
biaya keuangan As a percentage of total
konsolidasian 16.96% 35.17% consolidated finance costs
Kebijakan harga Grup untuk transaksi dengan The Group’s pricing policy for transactions with
pihak berelasi ditetapkan berdasarkan pada related parties is set based on contracted
harga di dalam kontrak. prices.
c. Kompensasi manajemen kunci c. Key management compensation
Dewan Komisaris dan Direksi Grup merupakan The Boards of Commissioners and Directors of
personil manajemen kunci. the Group are considered key management
personnel.
Kompensasi untuk Dewan Komisaris dan Direksi The compensation for the Boards of
Grup untuk tahun yang berakhir pada tanggal Commissioners and Directors of the for years
31 Desember 2024 dan 2023, adalah sebagai ended 31 December 2024 and 2023, was as
berikut: follows:
2024 2023
Remunerasi 35,655 31,033 Remuneration
Imbalan pasca kerja 1,048 1,014 Post-employment benefits
Total 36,703 32,047 Total
Dewan Komisaris dan Direksi tidak menerima The Boards of Commissioners and Directors
kompensasi lain seperti rencana opsi saham do not receive any other compensation such
manajemen. as management stock options.
Page 142
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/121 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
35. LABA PER SAHAM DASAR DAN DILUSIAN 35. BASIC AND DILUTED EARNINGS PER SHARE
2024 2023
Laba konsolidasian
tahun berjalan yang dapat Consolidated profit for the year
diatribusikan kepada attributable to the owners
pemilik entitas induk 1,380,013 1,641,437 of the parent entity
Rata-rata tertimbang jumlah
saham biasa yang beredar Weighted average number of
(dalam ribuan ordinary shares outstanding
lembar saham) 30,731,355 30,917,363 (in thousands of shares)
Laba per saham dasar dan Basic and diluted earnings per share
dilusian yang dapat attributable to the owners
diatribusikan kepada pemilik of the parent entity
entitas induk (nilai penuh) 0.04491 0.05309 (full amount)
Rincian laba per saham dari operasi yang berlanjut dan Details of earnings per share from continuing
operasi yang dihentikan adalah sebagai berikut: operations and discontinued operations are as
follows:
Laba per saham dasar
dan dilusian dari Basic and diluted earnings per share
operasi yang berlanjut 0.01855 0.01870 from continuing operations
Laba per saham dasar
dan dilusian dari Basic and diluted earnings per share
operasi yang dihentikan 0.02636 0.03439 from discontinued operations
Laba per saham dasar dan Basic and diluted earnings per share
dilusian yang dapat attributable to the owners
diatribusikan kepada pemilik of the parent entity
entitas induk (nilai penuh) 0.04491 0.05309 (full amount)
Perusahaan tidak memiliki efek berpotensi dilusi The Company does not have any potentially
saham sehingga laba per saham dasar sama dengan dilutive shares. Therefore, the diluted earnings
laba per saham dilusian. per share is equal to the basic earnings per
share.
36. ASET DAN LIABILITAS MONETER NETO DALAM 36. NET MONETARY ASSETS AND LIABILITIES
MATA UANG ASING DENOMINATED IN FOREIGN CURRENCIES
Pada tanggal 31 Desember 2024 dan 2023, Grup As at 31 December 2024 and 2023, the Group had
memiliki aset dan liabilitas moneter dengan mata uang monetary assets and liabilities denominated in
selain Dolar AS sebagai berikut: currencies other than US Dollars as follows:
2024
Jumlah setara
ribuan Dolar AS/
S$ Euro A$ Equivalent
Dalam/in (nilai penuh/ (nilai penuh/ (nilai penuh/ in thousands
Rp’000 full amount) full amount) full amount) of US Dollars
Aset moneter Monetary assets
Kas dan setara kas 11,440,145,434 50 1,593 - 707,844 Cash and cash equivalents
Piutang usaha 4,442,371,168 - - - 274,866 Trade receivables
Pajak dibayar dimuka 821,353 - - - 51 Prepaid taxes
Deposito berjangka yang Restricted time
dibatasi penggunaannya 11,879,228 - - 735 deposits
Investasi lain-lain 10,144,777,908 - - - 627,693 Other investments
Pinjaman untuk pihak ketiga 3,024,249,602 - - - 187,121 Loans to third parties
Pinjaman untuk pihak berelasi 278,164,182 - - - 17,211 Loans to related parties
Total 29,342,408,875 50 1,593 - 1,815,521 Total
Liabilitas moneter Monetary liabilities
Utang usaha (2,084,065,570) (251,059) - (3,300) (129,136) Trade payables
Beban yang masih harus
dibayar (2,374,403,781) (342,009) (11,152) (875,377) (147,723) Accrued expenses
Utang pajak (96,745,732) - - - (5,986) Taxes payable
Liabilitas imbalan kerja Short-term employee
jangka pendek (210,106) - - - (13) benefits liabilities
Liabilitas imbalan Post-employment
pasca kerja (689,535,568) - - - (42,664) benefits liabilities
Utang bank (2,179,657,008) - - - (134,863) Bank loans
Liabilitas sewa (515,438,504) - - - (31,892) Lease liabilities
Provision for
Provisi pembongkaran, decommissioning, mine
rehabilitasi, reklamasi dan rehabilitation, reclamation
penutupan tambang (490,179,091) - - - (30,329) and closure
Total (8,430,235,360) (593,068) (11,152) (878,677) (522,606) Total
Aset moneter neto 20,912,173,515 (593,018) (9,559) (878,677) 1,292,915 Net monetary assets
Dalam ekuivalen AS$ 1,293,910 (437) (10) (548) 1,292,915 US$ equivalent
Page 143
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/122 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
36. ASET DAN LIABILITAS MONETER NETO DALAM 36. NET MONETARY ASSETS AND LIABILITIES
MATA UANG ASING (lanjutan) DENOMINATED IN FOREIGN CURRENCIES
(continued)
Pada tanggal 31 Desember 2024 dan 2023, Grup As at 31 December 2024 and 2023, the Group had
memiliki aset dan liabilitas moneter dengan mata uang monetary assets and liabilities denominated in
selain Dolar AS sebagai berikut: (lanjutan) currencies other than US Dollars as follows:
(continued)
2023
Jumlah setara
ribuan Dolar AS/
S$ Euro A$ Equivalent
Dalam/in (nilai penuh/ (nilai penuh/ (nilai penuh/ in thousands
Rp’000 full amount) full amount) full amount) of US Dollars
Aset moneter Monetary assets
Kas dan setara kas 9,797,195,092 1,219,992 1,593 586,478 636,847 Cash and cash equivalents
Piutang usaha 3,131,072,820 - - - 203,105 Trade receivables
Pajak dibayar dimuka 1,559,998,778 - - - 101,193 Prepaid taxes
Pajak yang bisa dipulihkan
kembali 604,249,278 - - - 39,196 Recoverable taxes
Deposito berjangka yang Restricted time
dibatasi penggunaannya 106,675,958 - - - 6,920 deposits
Investasi lain-lain 794,139,676 - - - 51,514 Other investments
Pinjaman untuk pihak ketiga 3,008,714,617 - - - 195,168 Loans to third parties
Pinjaman untuk pihak berelasi 46,900,000 - - - 3,043 Loans to related parties
Service concession
Piutang jasa konsesi 399,833,513 - - - 25,936 receivables
Aset tidak lancar lain-lain 5,494,589 - - - 356 Other non-current assets
Total 19,454,274,321 1,219,992 1,593 586,478 1,263,278 Total
Liabilitas moneter Monetary liabilities
Utang usaha (5,104,921,351) - (9,367) (8,033) (331,160) Trade payables
Beban yang masih harus
dibayar (1,948,136,165) (138,581) (30,000) (329,648) (126,712) Accrued expenses
Utang pajak (156,315,442) - - - (10,140) Taxes payable
Liabilitas imbalan kerja Short-term employee
jangka pendek (20,263,083) - - - (1,314) benefits liabilities
Utang lain-lain (26,026,801) - - - (1,688) Other liabilities
Liabilitas imbalan Post-employment
pasca kerja (1,139,828,697) - - - (73,938) benefits liabilities
Utang bank (228,342,151) (9,497,500) - - (22,015) Bank loans
Liabilitas sewa (243,556,287) - - - (15,799) Lease liabilities
Provision for
Provisi pembongkaran, decommissioning, mine
rehabilitasi, reklamasi dan rehabilitation, reclamation
penutupan tambang (2,688,429,458) - - - (174,392) and closure
Total (11,555,819,435) (9,636,081) (39,367) (337,681) (757,158) Total
Aset moneter neto 7,898,454,886 (8,416,089) (37,774) 248,797 506,120 Net monetary assets
Dalam ekuivalen AS$ 512,352 (6,361) (41) 170 506,120 US$ equivalent
Aset dan liabilitas moneter di atas dijabarkan The monetary assets and liabilities mentioned above
menggunakan kurs penutupan Bank Indonesia tanggal are translated using the Bank Indonesia closing rate
31 Desember 2024 dan 2023. as at 31 December 2024 and 2023.
Apabila aset dan liabilitas dalam mata uang selain If assets and liabilities in currencies other than
Dolar AS pada tanggal 31 Desember 2024 dijabarkan US Dollars as at 31 December 2024 are translated
dengan menggunakan kurs yang berlaku pada tanggal using the exchange rate as at the date of completion
penyelesaian laporan keuangan konsolidasian ini, of these consolidated financial statements, the total
jumlah aset moneter neto akan turun sekitar net monetary assets will decrease by approximately
AS$21.195. US$21,195.
Page 144
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/123 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
37. INFORMASI ARUS KAS 37. CASH FLOW INFORMATION
a. Transaksi non-kas a. Non-cash transactions
Tabel dibawah ini menunjukkan transaksi non- The table below shows the Group’s non-cash
kas Grup selama tahun berjalan sebagai berikut: transactions during the year as follows:
2024 2023
Aktivitas yang tidak
mempengaruhi arus kas: Non-cash activities:
Penambahan aset tetap
melalui beban yang masih Additions of fixed assets
harus dibayar dan through accruals
utang usaha 94,139 80,570 and trade payables
Perolehan aset tetap Acquisition of fixed assets
melalui liabilitas sewa 43,809 39,064 under leases
Penambahan aset tetap
dan properti pertambangan Additions of fixed assets
dari kapitalisasi biaya and mining properties through
pinjaman 17,573 7,523 capitalisation of borrowing costs
Penambahan kas dan
deposito berjangka yang
dibatasi penggunaannya Additions of restricted cash and time
melalui bunga roll-over 1,457 521 deposits through roll-over of interest
Penambahan aset tetap Additions of fixed assets
melalui kapitalisasi through capitalisation of
beban penyusutan 612 - depreciation expense
Pengurangan
aset tetap dan properti Deductions of fixed assets
pertambangan melalui and mining properties through
provisi, pembongkaran provision for decommissioning,
rehabilitasi, reklamasi mine rehabilitation, reclamation
dan penutupan tambang - (533) and closure
Pendapatan bunga yang
diakumulasikan Interest income accumulated to
ke pokok pinjaman - 161 loan principal
b. Rekonsiliasi liabilitas yang timbul dari b. Reconciliation of liabilities arising from
aktivitas pendanaan financing activities
Tabel dibawah ini menunjukkan rekonsiliasi The tables below set out a reconciliation of
liabilitas yang timbul dari aktivitas pendanaan liabilities arising from financing activities for the
untuk tahun yang berakhir pada tanggal years ended 31 December 2024 and 2023 as
31 Desember 2024 dan 2023 sebagai berikut: follows:
Perubahan non-kas/Non-cash changes
Penghentian
pengakuan
Pergerakan atas dampak
kurs mata operasi yang
uang asing/ dihentikan/
Akresi Foreign Derecognition Saldo
Saldo awal/ bunga/ exchange due to akhir
Beginning Arus kas/ Interest rate Sewa baru/ discontinued Ending
balance Cash flows accretion movement New leases operations balance
2024 2024
Liabilitas sewa 111,911 (34,754) (1,110) 3,090 43,809 (5,439) 117,507 Lease liabilities
Utang bank 627,143 529,797 1,020 (3,378) - (692,244) 462,338 Bank loans
Senior Notes 697,189 (700,043) 2,854 - - - - Senior Notes
Pinjaman dari pihak
ketiga 3,013 15,596 - (117) - (18,492) - Loans from third parties
Total 1,439,256 (189,404) 2,764 (405) 43,809 (716,175) 579,845 Total
Page 145
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/124 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
37. INFORMASI ARUS KAS (lanjutan) 37. CASH FLOW INFORMATION (continued)
b. Rekonsiliasi liabilitas yang timbul dari b. Reconciliation of liabilities arising from
aktivitas pendanaan (lanjutan) financing activities (continued)
Perubahan non-kas/Non-cash changes
Pergerakan
kurs mata
uang asing/
Akresi Foreign Saldo
Saldo awal/ bunga/ exchange Sewa akhir/
Beginning Arus kas/ Interest rate baru/ Ending
balance Cash flows accretion movement New leases balance
2023 2023
Liabilitas sewa 67,650 (36,435) - 126 80,570 111,911 Lease liabilities
Utang bank 810,849 (191,452) 7,991 (245) - 627,143 Bank loans
Senior Notes 700,890 (7,030) 3,329 - - 697,189 Senior Notes
Pinjaman dari pihak ketiga 3,256 (180) - (63) - 3,013 Loans from third parties
Total 1,582,645 (235,097) 11,320 (182) 80,570 1,439,256 Total
38. PENGHASILAN DAN BIAYA KEUANGAN 38. FINANCE INCOME AND COSTS
a. Penghasilan keuangan a. Finance income
2024 2023
Penghasilan bunga dari
pinjaman yang diberikan 60,389 32,549 Interest income from loans
Penghasilan bunga
dari bank 57,829 33,416 Interest income from banks
Lain-lain 1,744 137 Others
Total 119,962 66,102 Total
b. Biaya keuangan b. Finance costs
2024 2023
Bunga dari utang bank Interest on bank loans
dan Senior Notes 26,882 32,283 and Senior Notes
Bunga dari pinjaman Interest on loan
dari pihak berelasi 9,179 21,765 from related parties
Bunga dari sewa 7,712 6,011 Interest on leases
Amortisasi biaya keuangan Amortisation of deferred
yang ditangguhkan 5,296 3,860 financing costs
Lain-lain 5,073 589 Others
Total 54,142 64,508 Total
39. SEGMEN OPERASI 39. OPERATING SEGMENTS
Manajemen telah menentukan segmen operasi Management has determined the operating
berdasarkan laporan yang ditelaah oleh Direksi, yang segments based on reports reviewed by the Board
telah diidentifikasikan sebagai pengambil keputusan of Directors, which has been identified as the
operasional utama Grup, dalam mengambil keputusan Group’s chief operating decision maker, which
strategis. makes strategic decisions.
Direksi mempertimbangkan operasi bisnis dari The Board of Directors considers the business
perspektif jenis bisnis yang terdiri dari pertambangan operation from a business type perspective, which
dan perdagangan batubara, jasa pertambangan, comprises coal mining and trading, mining services,
logistik dan lain-lain (pembangkit listrik, manajemen logistics and others (power plant, asset
aset dan sebagainya). management, etc.).
Page 146
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/125 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
39. SEGMEN OPERASI (lanjutan) 39. OPERATING SEGMENTS (continued)
Informasi segmen yang diberikan kepada Direksi untuk The segment information provided to the Board of
pelaporan segmen adalah sebagai berikut: Directors for the reportable segments is as follows:
2024
Pertambangan
dan
perdagangan Jasa
batubara/ pertambangan/
Coal mining Mining Logistik/ Lain-lain/ Eliminasi/ Konsolidasi/
and trading Services Logistics Others Eliminations Consolidated
Pendapatan di luar segmen 1,151,940 848,769 - 77,980 - 2,078,689 External revenue
Pendapatan antar segmen - 121,232 - 5,091 (126,323) - Inter-segment revenue
Pendapatan usaha 1,151,940 970,001 - 83,071 (126,323) 2,078,689 Revenue
Beban pokok pendapatan (573,745) (728,202) - (18,621) 115,878 (1,204,690) Cost of revenue
Beban penjualan dan Selling and marketing
pemasaran (10,038) - - - - (10,038) expenses
Beban umum dan General and
administrasi (13,603) (38,387) - (81,778) 3,449 (130,319) administrative expenses
Biaya keuangan (9,940) (29,747) - (14,772) 317 (54,142) Finance costs
Penghasilan keuangan 20,483 6,808 - 96,554 (3,883) 119,962 Finance income
Beban pajak penghasilan (125,088) (41,215) - (10,206) 4,173 (172,336) Income tax expense
Laba tahun berjalan dari Profit for the year from
operasi yang berlanjut 446,514 138,327 - 65,264 (12,621) 637,484 continuing operations
Laba tahun berjalan dari Profit for the year from
operasi yang dihentikan 759,999 446 259,996 (66,809) (34,984) 918,648 discontinued operations
Laba tahun berjalan 1,206,513 138,773 259,996 (1,545) (47,605) 1,556,132 Profit for the year
Penyusutan dan Depreciation and
amortisasi (40,613) (175,096) - (11,494) (345) (227,548) amortisation
31 Desember 2024 31 December 2024
Aset segmen 1,345,431 928,049 - 4,043,425 385,222 6,702,127 Segment assets
Liabilitas segmen 186,510 400,900 - 687,898 55,987 1,331,295 Segment liabilities
2023
Pertambangan
dan
perdagangan Jasa
batubara/ pertambangan/
Coal mining Mining Logistik/ Lain-lain/ Eliminasi/ Konsolidasi/
and trading services Logistics Others Eliminations Consolidated
Pendapatan di luar segmen 1,084,004 974,983 - 76,425 - 2,135,412 External revenue
Pendapatan antar segmen - 96,982 - 4,630 (101,612) - Inter-segment revenue
Pendapatan usaha 1,084,004 1,071,965 - 81,055 (101,612) 2,135,412 Revenue
Beban pokok pendapatan (499,831) (846,478) - (14,223) 92,801 (1,267,731) Cost of revenue
Beban penjualan dan Selling and marketing
pemasaran 1,196 - - - (14,956) (13,760) expenses
Beban umum dan General and
administrasi 33,601 (38,387) - (64,300) (11,099) (80,185) administrative expenses
Biaya keuangan (22,996) (34,074) - (17,668) 10,230 (64,508) Finance costs
Penghasilan keuangan 10,690 4,662 - 59,958 (9,208) 66,102 Finance income
Beban pajak penghasilan (122,789) (34,880) - (8,357) 744 (165,282) Income tax expense
Laba tahun berjalan dari Profit for the year from
operasi yang berlanjut 464,116 117,377 - 79,676 (7,863) 653,306 continuing operations
Laba tahun berjalan dari Profit for the year from
operasi yang dihentikan 961,120 111 244,804 (10,343) 5,880 1,201,572 discontinued operations
Laba tahun berjalan 1,425,236 117,488 244,804 69,333 (1,983) 1,854,878 Profit for the year
Penyusutan dan Depreciation and
amortisasi (41,163) (175,553) - (11,624) 4,328 (224,012) amortisation
31 Desember 2023 31 December 2023
Aset segmen 5,052,200 947,373 676,227 4,288,356 (491,445) 10,472,711 Segment assets
Liabilitas segmen 2,505,537 633,298 124,302 1,611,513 (1,810,689) 3,063,961 Segment liabilities
Mayoritas aset tidak lancar Grup berada di Indonesia. The majority of the Group’s non-current assets are
located in Indonesia.
Page 147
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/126 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
39. SEGMEN OPERASI (lanjutan) 39. OPERATING SEGMENTS (continued)
Penjualan berdasarkan tujuan adalah sebagai berikut: Sales by destination were as follows:
2024 2023
Domestik 1,293,284 1,191,375 Domestic
Ekspor Export
- Singapura 497,297 512,657 Singapore -
- Korea 180,543 70,615 Korea -
- Cina 70,577 216,377 China -
- India 36,988 144,388 India -
Total 2,078,689 2,135,412 Total
Penjualan antar segmen dilakukan berdasarkan pada Sales between segments are carried out at
harga di dalam kontrak. Pendapatan dari pihak contracted prices. The revenue from external parties
eksternal yang dilaporkan kepada Direksi diukur reported to the Board of Directors is measured in a
dengan cara yang sama sebagaimana disampaikan manner consistent with that presented in profit or
pada laba rugi. loss.
Jumlah yang dilaporkan kepada Direksi sehubungan The amounts provided to the Board of Directors with
dengan jumlah aset dan liabilitas diukur dengan cara respect to total assets and liabilities are measured in
yang konsisten dengan yang dilaporkan dalam laporan a manner consistent with the reporting in the
posisi keuangan konsolidasian. consolidated statements of financial position.
40. OPERASI YANG DIHENTIKAN 40. DISCONTINUED OPERATIONS
a. Penjualan bisnis batubara termal a. Sale of thermal coal business
Pada tanggal 9, 10 dan 11 Desember 2024, On 9, 10 and 11 December 2024, the
Perusahaan telah melakukan pengalihan Company has transferred its shares in Adaro
sahamnya di Adaro dengan total 5.811.178.298 totalling to 5,811,178,298 shares or equivalent
saham atau setara dengan 74,63% dari to 74.63% of its ownership in Adaro through
kepemilikan Perusahaan di Adaro melalui Public Offering by Existing Shareholders
mekanisme Penawaran Umum oleh Pemegang mechanism. The Company has fully received
saham. Perusahaan telah sepenuhnya menerima the payment from the transfer of the shares in
pembayaran atas pengalihan saham Adaro. Adaro.
Perusahaan memiliki sisa kepemilikan saham di The Company holds a remaining 15.37%
Adaro sebesar 15,37% setelah melakukan ownership in Adaro after selling Adaro shares.
penjualan saham Adaro. Sisa kepemilikan saham The remaining ownership in Adaro is recorded
di Adaro dibukukan sebagai aset keuangan pada as a financial asset at FVOCI. The Company
nilai wajar melalui penghasilan komprehensif records its ownership in Adaro as a financial
lain. Perusahaan membukukan kepemilikan asset at FVOCI because the Company does
saham di Adaro sebagai aset keuangan pada not have significant influence over Adaro.
nilai wajar melalui penghasilan komprehensif lain
karena Perusahaan tidak memilki pengaruh
signifikan atas Adaro.
Akibat dari transaksi di atas, laporan laba rugi As a result of the above transaction, the
dan penghasilan komprehensif lain konsolidasian consolidated statement of profit or loss and
untuk tahun 2023 direpresentasikan. other comprehensive income for 2023 were
represented.
Page 148
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/127 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
40. OPERASI YANG DIHENTIKAN (lanjutan) 40. DISCONTINUED OPERATIONS (continued)
b. Performa finansial dan informasi arus kas b. Financial performance and cash flow
Adaro information of Adaro
Perusahaan secara efektif kehilangan The Company effectively lost control of Adaro
pengendalian atas Adaro pada 9 Desember 2024 on 9 December 2024 since the Company have
karena Perusahaan telah menjual sebagian sold most of its share ownership on that date.
besar kepemilikan sahamnya pada tanggal The financial performance and cash flow
tersebut. Kinerja keuangan dan informasi arus information presented below are for the period
kas yang disajikan di bawah ini adalah untuk ended 9 December 2024 and the year ended
periode yang berakhir pada 9 Desember 2024 31 December 2023:
dan tahun yang berakhir pada 31 Desember
2023:
2024 2023
Pendapatan 3,554,212 4,382,144 Revenue
Beban pokok pendapatan (2,234,703) (2,712,541) Cost of revenue
Beban usaha (205,277) (249,994) Operating expenses
Pendapatan/(beban)
lain-lain, neto 9,595 (29,046) Other income/(expenses), net
Biaya keuangan (34,938) (44,894) Finance costs
Penghasilan keuangan 44,587 74,314 Finance income
Bagian atas keuntungan Share in net profit of
neto ventura bersama joint ventures
dan asosiasi 15,763 55,712 and associates
Laba sebelum
pajak penghasilan 1,149,239 1,475,695 Profit before income tax
Beban pajak penghasilan (204,202) (274,123) Income tax expense
Laba setelah pajak
penghasilan atas
operasi yang Profit after income tax
dihentikan 945,037 1,201,572 of discontinued operations
Reklasifikasi penghasilan Reclassification of
komprehensif lain (26,389) - other comprehensive income
Laba dari operasi Profit from discontinued
yang dihentikan 918,648 1,201,572 operations
Penghasilan
komprehensif lain
pada operasi Other comprehensive income
yang dihentikan (3,916) 14,441 on discontinued operations
Total penghasilan
komprehensif
dari operasi Total comprehensive income
yang dihentikan 914,732 1,216,013 from discontinued operations
Arus kas masuk bersih
dari aktivitas Net cash inflow
operasional 1,537,850 595,206 from operating activities
Arus kas masuk
bersih dari Net cash inflow
aktivitas investasi 222,636 (79,015) from investing activities
Arus kas keluar bersih
dari aktivitas Net cash outflow
pendanaan (2,398,553) (1,365,907) from financing activities
Penurunan
bersih kas yang Net decrease in
dihasilkan atas operasi cash generated by the
yang dihentikan (638,067) (849,716) discontinued operations
Page 149
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/128 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
40. OPERASI YANG DIHENTIKAN (lanjutan) 40. DISCONTINUED OPERATIONS (continued)
c. Rincian penjualan entitas anak c. Details of the sale of the subsidiary
Tabel di bawah ini menunjukkan rekonsiliasi kas Table below show reconciliation of cash
yang diterima dari penjualan anak perusahaan received from sale of subsidiary to gain or loss
dengan keuntungan atau kerugian yang timbul arise from sale of subsidiary
dari penjualan anak perusahaan.
2024
Imbalan kontinjensi
yang diterima atau Consideration received
yang akan diterima: or receivable:
- Kas 2,181,049 Cash -
Nilai tercatat aset bersih Carrying amount of
yang dijual (2,698,763) net assets sold
Sisa investasi 449,034 Retained interests
Kerugian atas
penjualan sebelum Loss on sale before
reklasifikasi penghasilan reclassification of other
komprehensif lain (68,680) comprehensive income
Reklasifikasi
penghasilan Reclassification of other
komprehensif lain 26,389 comprehensive income
Kerugian penjualan Adaro setelah pajak Loss on sale of Adaro after income tax for the
penghasilan untuk periode yang berakhir pada period ended 9 December 2024 were allocated
tanggal 9 Desember 2024 dialokasikan ke to additional paid in capital, net and other
tambahan modal disetor, neto dan beban lain- expenses, net amounting to US$68,680 (Note
lain, neto masing-masing adalah sebesar 24) and US$26,389, respectively.
AS$68.680 (Catatan 24) dan AS$26.389.
Page 150
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/129 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
40. OPERASI YANG DIHENTIKAN (lanjutan) 40. DISCONTINUED OPERATIONS (continued)
c. Rincian penjualan entitas anak (lanjutan) c. Details of the sale of the subsidiary
(continued)
Nilai tercatat aset dan kewajiban pada tanggal The carrying amount of assets and liabilities as
penjualan adalah sebagai berikut: at the date of sale were as follows:
2024
Kas dan setara kas 1,681,054 Cash and cash equivalents
Kas dan deposito berjangka
yang dibatasi penggunaannya 37,572 Restricted cash and time deposits
Piutang usaha 468,353 Trade receivables
Investasi lain-lain 573,909 Other investments
Persediaan 99,092 Inventories
Pajak dibayar dimuka 130,191 Prepaid taxes
Piutang lain-lain 79,241 Other receivables
Pinjaman untuk pihak ketiga 2,397 Loans to third parties
Uang muka dan
biaya dibayar dimuka 106,379 Advances and prepayments
Investasi pada ventura bersama Investments in joint ventures
dan asosiasi 892,808 and associates
Properti pertambangan 405,136 Mining properties
Aset tetap 911,644 Fixed assets
Goodwill 737,278 Goodwill
Aset takberwujud 3,318 Intangible assets
Aset pajak tangguhan 39,800 Deferred tax assets
Aset lain-lain 38,414 Other assets
Total aset 6,206,586 Total assets
Utang usaha 622,143 Trade payables
Utang dividen 1,395 Dividends payable
Beban yang masih harus dibayar 264,292 Accrued expenses
Liabilitas imbalan kerja Short-term employee
jangka pendek 991 benefits liabilities
Utang pajak: Taxes payable:
- Pajak penghasilan badan 22,287 Corporate income tax payable -
- Pajak lainnya 16,232 Other taxes payable -
Utang royalti 25,357 Royalties payable
Pinjaman jangka panjang Long-term borrowings:
- Liabilitas sewa 5,439 Lease liabilities -
- Utang bank 692,244 Bank loans -
Provisi pembongkaran, Provision for decommisioning,
rehabilitasi, reklamasi mine rehabilitation,
dan penutupan tambang 219,094 reclamation and closure
Liabilitas pajak tangguhan 58,861 Deferred tax liabilities
Liabilitas imbalan pasca kerja 24,038 Post-employment benefits liabilities
Pinjaman dari pihak ketiga 18,492 Loans from third parties
Pinjaman dari pihak berelasi 829,559 Loans from related parties
Utang lain-lain 29,717 Other liabilities
Total liabilitas 2,830,141 Total liabilities
Aset bersih 3,376,445 Net assets
Kepentingan non-pengendali 377,819 Non-controlling interests
Aset bersih yang diatribusikan Net assets attributable to
kepada pemilik entitas induk 2,998,626 owners of the parent entity
Aset bersih yang diatribusikan Net assets attributable to
kepada Perusahaan 2,698,763 the Company
Page 151
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/130 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI AND CONTINGENCIES
a. Perjanjian penambangan, pengangkutan, a. Coal mining, hauling, barging,
pemindahan batubara, dan perjanjian terkait transhipment and other related agreements
lainnya
AI, sebagai produsen batubara, mengadakan AI, as a coal producer, has entered into a
sejumlah perjanjian penambangan batubara. number of coal mining agreements. Under the
Berdasarkan perjanjian-perjanjian tersebut, AI agreements, AI is required to pay contractors
diharuskan membayar biaya sewa dan biaya jasa a rental fee and a service fee, calculated on a
kepada kontraktor, dihitung secara bulanan, monthly basis, based on a formula that
berdasarkan rumus yang meliputi jumlah includes the amount of raw coal transported
batubara mentah yang diangkut dan overburden and overburden mined and transported. The
yang ditambang dan diangkut. Kontraktor akan contractors will provide the equipment,
menyediakan sarana, mesin, perlengkapan, dan machinery, appliances and other supplies
barang-barang lain yang diperlukan dan dalam necessary and also in some instances may
kondisi tertentu dapat menggunakan peralatan AI use AI’s own equipment for performing the
sendiri untuk melakukan jasa penambangan dan mining and transportation services and are
transportasi, dan diharuskan memenuhi required to meet certain minimum production
persyaratan minimum produksi tertentu. requirements.
AI juga mengadakan perjanjian pengangkutan, AI has also entered into coal barging, transport
transportasi, dan pemindahan batubara dengan and transhipment agreements with contractors
kontraktor untuk menyediakan jasa transportasi to provide coal transportation services from
dari wilayah utama AI ke pelabuhan tujuan yang AI’s main areas to certain port destinations and
telah ditentukan dan menyediakan jasa floating to provide floating crane services from the
crane dari tongkang kontraktor ke kapal contractors’ barge to customers’ vessels. AI is
pelanggan. AI diharuskan membayar biaya jasa required to pay contractors a service fee,
kepada kontraktor, dihitung secara bulanan, calculated on a monthly basis, based on a
berdasarkan suatu rumus yang meliputi jumlah formula that takes into account the amount of
batubara yang diangkut. coal transported.
Pada tanggal 11 September 2015, AI On 11 September 2015, AI entered into a fuel
mengadakan perjanjian penyediaan bahan bakar supply agreement with PT Pertamina
minyak dengan PT Pertamina (Persero) (Persero) (“Pertamina”), whereby AI is
(“Pertamina”), dimana AI diharuskan membayar required to pay Pertamina a price, based on a
kepada Pertamina berdasarkan suatu rumus formula that consists of the volume of fuel
yang meliputi jumlah bahan bakar minyak yang supplied and the market price of fuel, and AI is
disediakan dan harga pasar atas bahan bakar required to purchase a minimum annual
minyak dan AI juga diharuskan membeli jumlah volume of fuel. This agreement was effective
minimum tertentu volume bahan bakar minyak from 1 November 2015.
setiap tahun. Perjanjian ini berlaku efektif pada
tanggal 1 November 2015.
Sejak tanggal 16 September 2021, berdasarkan Since 16 September 2021, according to the
perjanjian novasi atas fuel supply agreement novation agreement of fuel supply agreement
yang telah dibuat dan ditandatangani oleh dan that has been made and signed by and
antara AI, Pertamina, dan PT Pertamina Patra between AI, Pertamina, and PT Pertamina
Niaga, seluruh tanggung jawab, hak dan Patra Niaga, all of the responsibilities, rights
kewajiban Pertamina berdasarkan perjanjian and obligations of Pertamina under the fuel
penyediaan bahan bakar minyak dialihkan supply agreement were transferred to PT
kepada PT Pertamina Patra Niaga. Perjanjian Pertamina Patra Niaga. This novation
novasi ini diubah terakhir berdasarkan agreement was amended last by amendment
amandemen III atas fuel supply agreement untuk III of the fuel supply agreement to extend the
memperpanjang jangka waktu perjanjian sampai term until 31 January 2023 (“FSA”).
dengan 31 Januari 2023 (“FSA”).
Page 152
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/131 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
a. Perjanjian penambangan, pengangkutan, a. Coal mining, hauling, barging,
pemindahan batubara, dan perjanjian terkait transhipment and other related agreements
lainnya (lanjutan) (continued)
Pada tanggal 31 Januari 2023, AI mengadakan On 31 January 2023, AI entered into a new fuel
perjanjian pemasokan bahan bakar minyak baru supply agreement with PT Pertamina Patra
dengan PT Pertamina Patra Niaga melanjutkan Niaga which continues the agreement
perjanjian antara AI dengan PT Pertamina Patra between AI and PT Pertamina Patra Niaga
Niaga yang sebelumnya tertuang dalam FSA. previously stated in the FSA. This fuel supply
Perjanjian penyediaan bahan bakar ini berlaku agreement effective until 30 September 2029.
sampai dengan 30 September 2029. Pada On 28 March 2024, this agreement was
tanggal 28 Maret 2024, perjanjian ini telah amended to change several provisions, which
diamendemen untuk mengubah beberapa effective since 1 April 2024.
ketentuan, dengan keberlakuan efektif sejak
tanggal 1 April 2024.
Berikut ini adalah pihak-pihak yang mengadakan The following are counterparties of the Group’s
perjanjian dengan Grup: commitments:
Kontraktor/ Tipe perjanjian/ Tanggal perjanjian/ Akhir periode perjanjian/
Contractor Agreement type Agreement date Contract period end
PT Bukit Makmur Jasa pertambangan/ 29 Juni/ 31 Desember/December 2025
Mandiri Utama Mining services June 2021 bergantung pada persyaratan dan
ketentuan dalam
perjanjian/Subject to terms and
conditions under the agreement
PT Mitrabahtera Pengangkutan batubara/ 1 Oktober/ 30 September 2025
Segara Sejati Coal barging October 2010
Tbk
PT Pertamina Patra Penyediaan bahan bakar/ 31 Januari/January 2023 30 September 2029
Niaga Fuel supply
PT Samudera Kesepakatan untuk mengakses koridor 6 November 2015 Pada akhir PKP2B MC/
Rejeki Perkasa jalan/Agreement to access road corridor End of MC’s CCoW
PT Fortuna Cipta Kesepakatan untuk mengakses koridor 24 Desember/December Pada akhir PKP2B LC dan MC/
Sejahtera jalan/Agreement to access road corridor 2014 End of LC’s and MC’s CCoW
PT Pada Idi Perjanjian penggunaan Intermediate 30 Juni/June 2021 30 Juni/June 2026
Stockpile Teluk Timbau/Agreement for
Usage of Intermediate Stockpile Teluk
Timbau
PT Putra Perkasa Jasa pertambangan/ 16 April 2024 30 September 2027
Abadi Mining services
Page 153
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/132 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
a. Perjanjian penambangan, pengangkutan, a. Coal mining, hauling, barging,
pemindahan batubara, dan perjanjian terkait transhipment and other related agreements
lainnya (lanjutan) (continued)
Berikut ini adalah pihak-pihak yang mengadakan The following are counterparties of the Group’s
perjanjian dengan Grup: (lanjutan) commitments: (continued)
Pelanggan/ Tipe perjanjian/ Tanggal perjanjian/ Akhir periode perjanjian/
Customer Agreement type Agreement date Contract period end
AI Pengupasan lapisan tanah penutup dan 1 Januari/January 2009 30 September 2042
pertambangan batu bara/Stripping of
overburden and mining of coal
AI Pengangkutan batu bara/Coal 1 Januari/January 2009 30 September 2042
transportation
AI Sewa peralatan berat/Rental of heavy 1 Januari/January 2009 30 September 2042
equipment
AI Pengangkutan batu bara/Coal 1 April 2016 31 December 2024*
transportation to MSW
LSA Pengupasan lapisan tanah penutup dan 1 Juni/June 2015 15 September 2034
pertambangan batu bara/ Stripping of
overburden and mining of coal
LSA Sewa peralatan berat/Rental of heavy 1 Juni/June 2015 15 September 2034
equipment
PCS Pengupasan lapisan tanah penutup dan 1 Maret/March 2014 23 Maret/March 2029
pertambangan batu bara/ Stripping of
overburden and mining of coal
PCS Sewa peralatan berat/Rental of heavy 1 Juni/June 2015 23 Maret/March 2029
equipment
SCM Pengupasan lapisan tanah penutup dan 1 Maret/March 2014 20 Juli/July 2029
pertambangan batu bara/ Stripping of
overburden and mining of coal
SCM Sewa peralatan berat/Rental of heavy 1 Maret/March 2014 20 Juli/July 2029
equipment
AL Jasa pengangkutan bahan bakar/Fuel 20 April 2021 19 April 2031
transportation service
*) Perjanjian ini sedang dalam proses perpanjangan *) This agreement is in the process of extension
Berdasarkan perjanjian-perjanjian yang Under the agreements made by SIS and third-
dibuat oleh SIS dan produsen batubara party coal producers, SIS provides equipment
pihak ketiga, SIS menyediakan peralatan through a rental mechanism, and provides
dengan mekanisme sewa dan menyediakan jasa mining services for overburden removal and
pertambangan untuk pemindahan hauling. SIS is required to meet a minimum
dan pengangkutan overburden. SIS diharuskan production level for certain activities. SIS
untuk memenuhi tingkat produksi minimum untuk receives a service fee calculated on a monthly
aktivitas-aktivitas tertentu. SIS akan menerima basis, based on a formula that includes several
imbalan jasa yang dihitung secara bulanan, adjustment clauses.
berdasarkan suatu rumus yang meliputi beberapa
klausa penyesuaian.
b. Perjanjian Kerjasama Penggunaan Tanah b. Land-Use Cooperation Agreement
Pada tanggal 4 November 2009, MSW On 4 November 2009, MSW and the
dan Pemerintah Kabupaten Tabalong Government of Tabalong Regency entered
mengadakan perjanjian kerjasama penggunaan into a land-use cooperation agreement, for the
tanah milik Pemerintah Kabupaten Tabalong, use of 100.2 hectares of the Government of
seluas 100,2 hektar yang terletak di desa Tabalong Regency’s land, located in Mabu’un
Mabu’un, Kabupaten Tabalong, Kalimantan village, Tabalong Regency, South Kalimantan.
Selatan. Dengan adanya perjanjian kerjasama Under this land-use cooperation agreement,
penggunaan tanah, MSW telah mendaftarkan MSW has registered and obtained a land right
dan mendapatkan sertifikat Hak Guna Bangunan over the Certificate of Management Rights
diatas sertifikat Hak Pengelolaan atas nama held by the Government of Tabalong Regency.
Pemerintah Kabupaten Tabalong.
Page 154
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/133 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES
b. Perjanjian Kerjasama Penggunaan Tanah b. Land-Use Cooperation Agreement
(lanjutan) (continued)
Pada tanggal 27 Februari 2014, MSW dan On 27 February 2014, MSW and the
Pemerintah Kabupaten Tabalong melakukan Government of Tabalong Regency amended
perubahan atas jangka waktu perjanjian the term of the land-use cooperation
kerjasama penggunaan tanah menjadi 50 tahun, agreement to 50 years, revised the land area
merevisi luas tanah berdasarkan kebutuhan, dan based on needs, and provided fixed
memberikan kontribusi tetap dan pembagian contribution and profit sharing to the
hasil keuntungan kepada Pemerintah Kabupaten Government of Tabalong Regency.
Tabalong.
c. Fasilitas bank c. Banking facilities
Pada tanggal 5 September 2007, AI mengadakan On 5 September 2007, AI entered into a
perjanjian fasilitas perbankan dengan HSBC banking facility agreement with HSBC to issue
untuk penerbitan garansi bank. Perjanjian ini bank guarantees. This agreement has been
telah mengalami beberapa kali perubahan amended several times with the latest
dengan perubahan terakhir pada tanggal 19 amendment dated 19 December 2016. The
Desember 2016. Fasilitas ini merupakan facility represents a combined limit facility
gabungan limit fasilitas sebesar AS$45.000 amounting to US$45,000 with a treasury
dengan fasilitas treasury sebesar AS$5.000. facility amounting to US$5,000. This facility is
Fasilitas ini tidak diikat dengan jaminan apapun. not bound by any collateral. This agreement is
Perjanjian ini berlaku sampai HSBC valid until HSBC cancels, ceases or
membatalkan, menghentikan atau discharges AI in writing from its obligation
membebaskan AI secara tertulis dari under the agreement, or any other related
kewajibannya berdasarkan perjanjian, atau agreement.
perjanjian terkait lainnya.
Pada tanggal 28 April 2014, AI mengadakan On 28 April 2014, AI entered into a banking
perjanjian fasilitas perbankan dengan facility agreement with Bank Mandiri. The
Bank Mandiri. Fasilitas ini disediakan untuk facility is provided to issue a treasury line with
penerbitan treasury line dengan limit sebesar a total limit amounting to US$75,000 and bank
AS$75.000 dan fasilitas garansi bank dengan guarantees with a total limit amounting to
limit sebesar AS$50.000 dalam bentuk jaminan US$50,000 in the form of bid and performance
penawaran dan pelaksanaan. Fasilitas ini dapat bonds. This facility can also be used by certain
digunakan oleh perusahaan afiliasi tertentu affiliated companies with certain terms and
dengan syarat dan ketentuan tertentu. Fasilitas conditions. This facility is not bound by any
ini tidak diikat dengan jaminan apapun. collateral. The agreement has been amended
Perjanjian ini telah mengalami beberapa kali several times with the latest amendment dated
perubahan dengan perubahan terakhir pada 11 November 2024 to amend the list of parties
tanggal 11 November 2024 untuk mengubah for global line usage. The bank guarantee
daftar pihak untuk penggunaan global line. facility is only valid until 27 April 2023.
Fasilitas bank garansi hanya berlaku sampai
dengan 27 April 2023.
Pada tanggal 31 Desember 2023, total fasilitas As at 31 December 2023, the total bank
perbankan yang sudah digunakan oleh AI facilities used by AI amounted to US$1,200.
sebesar AS$1.200. Fasilitas tersebut digunakan These facilities were utilised in relation to sales
sehubungan dengan kontrak penjualan dan contracts and reclamation guarantees.
jaminan reklamasi.
Pada tanggal 19 Mei 2016, AP menandatangani On 19 May 2016, AP signed a banking facility
surat fasilitas perbankan dengan DBS Bank Ltd, letter with DBS Bank Ltd, to issue a bank
untuk menerbitkan bank garansi dalam bentuk guarantee in the form of financial or
jaminan finansial atau pelaksanaan dengan total performance guarantees with a total limit of
limit sebesar AS$25.000. Fasilitas ini dijamin US$25,000. This facility is fully guaranteed by
sepenuhnya oleh Perusahaan. Pada tanggal the Company. As at 31 December 2024, the
31 Desember 2024, total fasilitas perbankan total bank facility used which was obtained
yang sudah digunakan yang diperoleh dari DBS from DBS Bank Ltd amounted to S$1,950,000
Bank Ltd adalah sebesar S$1.950.000 (full amount) (2023: S$nil). These facilities
(nilai penuh) (2023: S$nihil). Fasilitas ini were utilised in relation to performance bond
digunakan sehubungan dengan jaminan and contingent sponsor support guarantee.
pelaksanaan dan garansi sponsor pendukung
kontijensi.
Page 155
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/134 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
c. Fasilitas bank (lanjutan) c. Banking facilities (continued)
Pada tanggal 14 Juli 2017, Perusahaan On 14 July 2017, the Company entered into a
mengadakan perjanjian fasilitas perbankan banking facility agreement with BRI to issue
dengan BRI untuk penerbitan garansi bank bank guarantees with a total limit amounting to
dengan total limit sebesar AS$183.500 dalam US$183,500 in the form of bid bonds,
bentuk jaminan penawaran, jaminan performance bonds, reclamation guarantees,
pelaksanaan, jaminan reklamasi, jaminan izin forestry lease-use permit guarantees, Standby
pinjam pakai kehutanan, Standby Letter of Credit Letters of Credit (“SBLC”), advance payment
(“SBLC”), jaminan uang muka dan jaminan bonds and maintenance bonds. This facility
pemeliharaan. Fasilitas ini dapat digunakan oleh can also be used by certain affiliated
perusahaan afiliasi tertentu dengan syarat dan companies with certain terms and conditions.
ketentuan tertentu. Fasilitas ini tidak diikat This facility is not bound by any collateral.
dengan jaminan apapun. Pada tanggal 14 On 14 October 2021, this agreement was
Oktober 2021, perjanjian ini telah diamandemen amended to extend the maturity date of the
untuk memperpanjang jangka waktu perjanjian agreement and change the total limit of this
dan mengubah total limit fasilitas menjadi facility to US$121,500. In this agreement, the
sebesar AS$121.500. Dalam perjanjian ini, facilities also provided a foreign exchange line
fasilitas yang disediakan termasuk fasilitas facility with a total limit amounting to
foreign exchange line dengan total limit sebesar US$75,000 and an import line facility with a
AS$75.000 dan import line dengan total limit total limit amounting to US$5,800. This
sebesar AS$5.800. Perjanjian ini terakhir diubah agreement has been amended, with the most
pada tanggal 19 Juli 2024 untuk mengubah total recent amendment dated 19 July 2024 to
fasilitas foreign exchange line menjadi change the total of foreign exchange line to
AS$100.000 dan memperpanjang jatuh tempo US$100,000 and extend the maturity date to
sampai dengan 14 Juli 2025. Fasilitas import line 14 July 2025. The import line facility is only
hanya berlaku sampai dengan 14 Juli 2024. valid until 14 July 2024.
Pada tanggal 9 Mei 2023, Perusahaan On 9 May 2023, the Company entered into a
mengadakan perjanjian fasilitas perbankan banking facility agreement with Bank Mandiri
dengan Bank Mandiri untuk penerbitan garansi to issue bank guarantees with a total limit
bank dengan total limit sebesar AS$150.000 amounting to US$150,000 in the form of bid
dalam bentuk jaminan penawaran, jaminan bonds, performance bonds, reclamation
pelaksanaan, jaminan reklamasi, SBLC, dan guarantees, SBLC and advance payment
jaminan uang muka untuk jangka waktu sampai bonds with a maturity date of 27 April 2024.
dengan 27 April 2024. Fasilitas ini dapat This facility can also be used by its
digunakan oleh entitas anak. Fasilitas ini tidak subsidiaries. This facility is not bound by any
diikat dengan jaminan apapun. Pada tanggal 28 collateral. On 28 May 2024, this agreement
Mei 2024, perjanjian ini telah diamandemen was amended to extend the term of the facility
untuk memperpanjang jangka waktu fasilitas to 27 April 2025.
sampai dengan 27 April 2025.
Pada tanggal 31 Desember 2024 dan 2023, total As at 31 December 2024 and 2023, the total
fasilitas perbankan yang sudah digunakan oleh bank facility used by the Group amounted to
Grup adalah masing-masing sebesar AS$29.633 US$29,633 and US$80,209, respectively. The
dan AS$80.209. Fasilitas yang digunakan facility was used in relation to reclamation
sehubungan dengan jaminan reklamasi, jaminan guarantees, performance bonds, bid bonds,
pelaksanaan, jaminan penawaran, SBLC dan SBLC and counter guarantees.
counter guarantees.
Pada tanggal 31 Desember 2023, AIS memiliki As at 31 December 2023, AIS has
uncommitted trade facilities dan modal kerja uncommitted trade facilities and working
dengan total sebesar AS$645.000 dari berbagai capital for a total of US$645,000 from various
bank. Pada tanggal 31 Desember 2023, sisa banks. As at 31 December 2023, the
saldo fasilitas perbankan yang tersedia adalah remaining balance of the bank facility
sebesar AS$443.420. amounted to US$443,420.
Page 156
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/135 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
d. Komitmen penjualan d. Sales commitments
Pada tanggal 31 Desember 2024, MC dan LC As at 31 December 2024, MC and LC had
memiliki beberapa komitmen untuk mengirimkan various commitments to deliver coal to various
batubara kepada beberapa pelanggan dengan customers approximately totalling to 2.5
total nilai berkisar masing-masing sebesar 2,5 million metric tonnes (unaudited) (2023: AI,
juta metrik ton (tidak diaudit) (2023: AI, MC, LC MC, LC and MIP totalling to 75.5 million metric
dan MIP dengan total nilai 75,5 juta metrik ton tonnes (unaudited)), subject to price
(tidak diaudit)), bergantung kepada kesepakatan agreements. The coal will be delivered
harga. Batubara tersebut akan dikirimkan secara periodically from 2025 until 2026.
periodik dari tahun 2025 sampai 2026.
e. Komitmen belanja modal e. Capital expenditure commitments
Pada tanggal 31 Desember 2024 dan 2023, Grup As at 31 December 2024 and 2023, the Group
mempunyai pesanan pembelian untuk peralatan had purchase orders for mining equipment,
tambang, konstruksi jalan tambang, infrastruktur hauling roads, infrastructure construction and
dan kapal masing-masing sebesar vessels amounting to US$536,240 and
AS$536.240 dan AS$367.047. US$367,047, respectively.
f. Pungutan penggunaan kawasan hutan f. Levy for use of forestry areas
Berdasarkan Peraturan Pemerintah No. 33 Based on Government Regulation No. 33 Year
Tahun 2014 tentang Jenis dan Tarif atas Jenis 2014 on the Type and Tariff of Non-Tax State
Penerimaan Negara Bukan Pajak (“PNBP”) yang Revenue (“PNBP”) from the Use of Forestry
berasal dari Penggunaan Kawasan Hutan untuk Area for the Interest of Development other
Kepentingan Pembangunan di Luar Kegiatan than Forestry Activities Applicable to the
Kehutanan yang Berlaku pada Kementerian Forestry Ministry, it is stipulated that the use of
Kehutanan, diatur bahwa penggunaan kawasan forestry areas for the interest of development
hutan untuk kepentingan pembangunan di luar other than forestry activities is subject to a
kegiatan kehutanan dikenakan pungutan PNBP PNBP levy for the entire forest area that is
atas seluruh area kawasan hutan yang dipinjam- leased and used and for the entire forest area
pakaikan dan seluruh area perjanjian pinjam for which lease and use agreements are still
pakai kawasan hutan yang masih berlaku sesuai effective, in accordance with the utilisation
kriteria penggunaannya dengan tarif berkisar dari criteria, with a tariff ranging from
Rp1.600.000/hektar sampai dengan Rp1,600,000/hectare to Rp4,000,000/hectare.
Rp4.000.000/hektar. Peraturan Pemerintah ini This Government Regulation was effective
mulai berlaku Agustus 2014 dan Grup telah from August 2014 and the Group has
mengakui pungutan PNBP ini secara akrual. recognised this PNBP levy on an accrual
basis.
Pada tanggal 30 September 2024, Pemerintah On 30 September 2024, the Government
mengundangkan Peraturan Pemerintah No. 36 issued Government Regulation No. 36 Year
Tahun 2024 tentang Jenis dan Tarif Atas Jenis 2024 on the Type and Tariff of Non-Tax State
Penerimaan Negara Bukan Pajak Yang Berlaku Revenue applicable to the Environment and
Pada Kementerian Lingkungan Hidup dan Forestry Ministry which stipulates that the use
Kehutanan yang menetapkan bahwa of forestry area for the interest of development
penggunaan kawasan hutan untuk kepentingan other than forestry activities is subject to a
pembangunan di luar kegiatan kehutanan PNBP levy with an annual tariff ranging from
dikenakan pungutan PNBP dengan tarif tahunan Rp2,500,000/hectare to Rp4,700,000/hectare.
berkisar antara Rp2.500.000/hektar hingga This regulation has revoked GR No. 33/2014.
Rp4.700.000/hektar. Peraturan ini mencabut PP
No. 33/2014.
g. Undang-Undang Pertambangan No. 3/2020 g. Mining Law No. 3/2020
UU No. 3/2020 mengatur beberapa hal, Law No. 3/2020 governs several provisions,
diantaranya ketentuan terkait hak, kewajiban, including provisions related to rights,
dan larangan dalam kegiatan usaha obligations, and prohibitions in mineral and
pertambangan mineral dan batubara. UU No. coal mining business activities. Law No.
3/2020 telah mengalami beberapa kali 3/2020 has undergone several amendments
perubahan dengan perubahan terakhir melalui with the latest amendment through
Peraturan Pemerintah Pengganti Undang- Government Regulation in Lieu of Law No. 2
Undang No. 2 Tahun 2022 tentang Cipta Kerja of 2022 regarding Job Creation (Perppu No.
(Perppu No. 2/2022) sebagaimana telah 2/2022) as stipulated into Law through Law
ditetapkan menjadi Undang-Undang melalui No. 6 of 2023 regarding the stipulation of
Undang-Undang No. 6 tahun 2023 tentang Perppu No. 2/2022 into Law ("Law No.
penetapan Perppu No. 2/2022 menjadi Undang- 6/2023") on 31 March 2023.
Undang (“UU No. 6/2023”) pada tanggal 31
Maret 2023.
Page 157
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/136 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
g. Undang-Undang Pertambangan No. 3/2020 g. Mining Law No. 3/2020 (continued)
(lanjutan)
Pada tanggal 9 September 2021, Pemerintah On 9 September 2021, the Government issued
mengeluarkan Peraturan Pemerintah No. 96 Government Regulation No. 96 of 2021 (“PP
Tahun 2021 (“PP No.96/2021”) yang mengatur No.96/2021”) concerning the Implementation
mengenai Pelaksanaan Kegiatan Usaha of Mineral and Coal Business Activities. The
Pertambangan Mineral dan Batubara. Indonesian government has amended PP No.
Pemerintah Indonesia telah mengubah PP No. 96/2021 by issuing Government Regulation
96/2021 dengan menerbitkan Peraturan No. 25/2024.
Pemerintah No. 25/2024 pada tanggal 30 Mei
2024
Grup terus memonitor perkembangan peraturan The Group is closely monitoring the progress
pelaksana Undang-Undang tersebut secara ketat of the implementing regulations for the Law
dan akan mempertimbangkan dampak terhadap and will consider the impact on the Group’s
operasi Grup, jika ada, pada saat peraturan- operations, if any, as these regulations are
peraturan pelaksana ini diterbitkan. issued.
h. Peraturan Menteri Lingkungan Hidup dan h. Ministerial Regulation of Environment and
Kehutanan No. P.59/MENLHK/SETJEN/ Forestry No. P.59/MENLHK/SETJEN/
KUM.1/10/2019 KUM.1/10/2019
Pada bulan November 2019, Kementerian In November 2019, the Ministry of
Lingkungan Hidup dan Kehutanan (“KLHK”) Environment and Forestry (“MoE&F”)
mengeluarkan Peraturan Menteri issued Ministerial Regulation
No. P.59/MENLHK/SETJEN/KUM.1/10/2019 No. P.59/MENLHK/SETJEN/KUM.1/10/2019
tentang Penanaman dalam Rangka Rehabilitasi regarding the Planting for the Rehabilitation of
Daerah Aliran Sungai. Watershed Areas.
Peraturan ini merupakan pedoman bagi This regulation is a guideline for Borrow and
pemegang Izin Pinjam Pakai Kawasan Hutan Use of Forest Area Permit (Izin Pinjam Pakai
(“IPPKH”) yang memiliki kewajiban untuk Kawasan Hutan/”IPPKH”) holders, who are
melakukan penanaman rehabilitasi Daerah Aliran obligated to perform rehabilitation of
Sungai (“DAS”) pada lokasi yang ditetapkan watershed at a location stipulated in
berdasarkan ketentuan yang diatur dalam accordance with the provisions set forth in this
peraturan ini, dan dengan tata cara pelaksanaan regulation, and with the procedure of
penanaman sesuai ketentuan yang diatur dalam rehabilitation according to the provisions set
peraturan ini. forth in this regulation.
MC, LC dan AI, sebagai pemegang IPPKH (saat MC, LC and AI, as the holders of an IPPKH
ini menjadi Persetujuan Penggunaan Kawasan (currently known as Forest Area Usage
Hutan (“PPKH”)) sudah mulai melaksanakan Agreement (Persetujuan Penggunaan
kewajiban atas penanaman rehabilitasi DAS Kawasan Hutan/”PPKH”)) have started to fulfil
tersebut dan telah mengakui kewajiban ini secara the obligation by planting the rehabilitation of
akrual. Grup terus memonitor perkembangan the watershed and have recognised this
pelaksanaan peraturan ini. obligation on an accrual basis. The Group
continues to monitor the progress of the
implementation of this regulation.
i. Peraturan Menteri No. 48/2017 i. Ministerial Regulation No. 48/2017
Pada tanggal 3 Agustus 2017, KESDM On 3 August 2017, the MoEMR issued
mengeluarkan Peraturan Menteri No. 48/2017 Ministerial Regulation No. 48/2017 regarding
tentang Pengawasan Pengusahaan di Sektor the Control of Enterprises in the Energy and
Energi dan Sumber Daya Mineral (“Permen No. Mineral Resources Sector (“Ministerial
48/2017”). Peraturan ini di antaranya mengatur Regulation No. 48/2017”). This regulation
mengenai persyaratan pengalihan saham dan governs the transfer of shares and changes in
perubahan Direksi dan/atau Komisaris. Setiap the Directors and/or Commissioners. Any
pengalihan saham di entitas-entitas AMC, AI, PC, transfer of shares of the AMC entities, AI, PC,
RC, PCS, SCM, LSA, MIP dan BEE memerlukan RC, PCS, SCM, LSA, MIP and BEE is subject
persetujuan terlebih dahulu dari KESDM. to the prior approval of the MoEMR.
Page 158
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/137 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
j. Peraturan Menteri No. 7/2020 j. Ministerial Regulation No. 7/2020
Pada tanggal 3 Maret 2020, KESDM On 3 March 2020, the MoEMR issued
mengeluarkan Peraturan Menteri No. 7/2020 Ministerial Regulation No. 7/2020 regarding
tentang Tata Cara Pemberian Wilayah, Perizinan Procedures for the Granting of Areas,
dan Pelaporan Pada Kegiatan Usaha Licensing and Reporting on Mineral and Coal
Pertambangan Mineral dan Batubara (“Permen Mining Activities (“Permen No. 7/2020”).
No. 7/2020”). Permen No. 7/2020 ini antara lain Permen No. 7/2020 revokes, among others,
mencabut Peraturan Menteri No. 11/2018 Ministerial Regulation No. 11/2018 on the
tentang Tata Cara Pemberian Wilayah, Procedures for the Granting of Areas,
Perizinan, dan Pelaporan pada Kegiatan Usaha Licensing and Reporting on Mineral and Coal
Pertambangan Mineral dan Batubara (“Permen Mining Activities (“Permen No. 11/2018”),
No. 11/2018”), Peraturan Menteri No. 22/2018 Ministerial Regulation No. 22/2018 on the
tentang Perubahan atas Permen No. 11/2018, Amendment to Permen No. 11/2018,
Peraturan Menteri No. 51/2018 tentang Ministerial Regulation No. 51/2018 on the
Perubahan Kedua atas Permen No. 11/2018 dan Second Amendment to Permen No. 11/2018
ketentuan mengenai perubahan Direksi dan/atau and provisions regarding changes in the
Komisaris di bidang pertambangan mineral dan Directors and/or Commissioners in the mineral
batubara sebagaimana diatur dalam Permen and coal mining sector as stipulated in
No. 48/2017. Ministerial Regulation No. 48/2017.
Permen No. 7/2020 ini di antaranya mengatur Permen No. 7/2020 regulates the preparation
tentang penyiapan dan penetapan Wilayah Izin and determination of Mining Permit Areas
Usaha Pertambangan (“WIUP”) dan Wilayah Izin (“WIUP”) and Special Mining Permit Areas
Usaha Pertambangan Khusus (“WIUPK”), Sistem (“WIUPK”), Information System of Mining
Informasi Wilayah Pertambangan, tata cara Areas, procedures for granting WIUP and
pemberian WIUP dan WIUPK, tata cara WIUPK, licensing procedures, rights,
pemberian perizinan, hak, kewajiban, dan obligations and prohibitions and budget work
larangan dan rencana kerja anggaran biaya dan plans and reports.
laporan.
Berdasarkan persyaratan dan ketentuan atau Based on the terms and conditions or
tata cara dalam Permen No. 7/2020 tersebut, procedures in Permen No. 7/2020, any
setiap perubahan saham di entitas-entitas AMC, changes in shares of the AMC entities, AI, PC,
AI, PC, RC, PCS, SCM, LSA dan MIP wajib RC, PCS, SCM, LSA and MIP are subject to
terlebih dahulu mendapatkan persetujuan prior approval from the MoEMR or the
KESDM atau gubernur sesuai dengan governor according to their authority and any
kewenangannya dan setiap perubahan Direksi changes in Directors and/or Commissioners of
dan/atau Komisaris di entitas-entitas AMC, AI, the AMC entities, AI, PC, RC, PCS, SCM, LSA
PC, RC, PCS, SCM, LSA dan MIP wajib and MIP must be submitted to the MoEMR or
disampaikan kepada KESDM atau gubernur governor according to their authority.
sesuai kewenangannya. Namun demikian, However, based on Law No. 3/2020, all
berdasarkan UU No. 3/2020, seluruh authorities of local government in coal and
kewenangan pemerintah daerah di bidang mineral mining have been transferred to the
pertambangan mineral dan batubara dialihkan central government. Permen No. 7/2020 has
kepada pemerintah pusat. Permen No. 7/2020 ini been amended through Ministerial Regulation
telah diubah dengan Peraturan Menteri No. 16/2021 regarding the Amendment to
No. 16/2021 tentang Perubahan atas Permen Permen No. 7/2020 issued on 29 June 2021.
No. 7/2020 yang diterbitkan pada tanggal
29 Juni 2021.
Pada tanggal 19 April 2018, KESDM menerbitkan On 19 April 2018, the MoEMR issued
Keputusan Menteri No. 1796K/30/MEM/2018 Ministerial Decree No. 1796K/30/MEM/2018
mengenai Pedoman Pelaksanaan Permohonan, regarding the Guidelines for the Application,
Evaluasi, serta Penerbitan Perizinan di Bidang Evaluation, and Issuance of Licences in the
Pertambangan Mineral dan Batubara, yang di Mineral and Coal Mining Sector, which among
antara lain mengatur pedoman pelaksanaan others regulates the guidelines for the
permohonan, evaluasi, dan penerbitan IUPK implementation of application, evaluation and
Operasi Produksi perpanjangan dari Kontrak the issuance of an IUPK Operation Production
Karya atau PKP2B yang telah berakhir. as an extension of an expired Contract of Work
or CCA/CCoW.
Page 159
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/138 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
k. Peraturan Menteri No. 7/2017 k. Ministerial Regulation No. 7/2017
Pada tanggal 11 Januari 2017, KESDM On 11 January 2017, the MoEMR issued
mengeluarkan Peraturan Menteri No. 7/2017 Ministerial Regulation No. 7/2017 regarding
tentang Tata Cara Penetapan Harga Patokan the Procedures for the Setting of Benchmark
Penjualan Mineral Logam dan Batubara, Prices for Metal Minerals and Coal Sales, as
sebagaimana terakhir kali diubah melalui last amended through Ministerial Regulation
Peraturan Menteri No. 11/2020. Sejak Peraturan No. 11/2020. Since Ministerial Regulation
Menteri No. 7/2017 mulai berlaku, ketentuan No. 7/2017 became applicable, the provisions
Peraturan Menteri No. 17/2010 sepanjang of Ministerial Regulation No. 17/2010 relating
mengatur mengenai harga patokan mineral dan to benchmark prices for minerals and coal
batubara, dicabut dan dinyatakan tidak berlaku. sales are revoked and no longer valid.
Pada tanggal 27 Februari 2023, KESDM On 27 February 2023, the MoEMR issued
menerbitkan Keputusan Menteri No. Ministerial Decree No. 41.K/MB.01/MEM.B/
41.K/MB.01/MEM.B/2023 tentang Pedoman 2023 regarding the Guidelines for the
Penetapan Harga Patokan Untuk Penjualan Determination of Benchmark Prices for the
Komoditas Batubara. Keputusan Menteri ini Sale of Coal Commodity. This Ministerial
mengatur formula-formula baru untuk Decree stipulates new formulas for the
perhitungan Harga Batubara Acuan dan Harga calculation of the Coal Reference Price and
Patokan Batubara yang berlaku sejak tanggal 27 the Coal Benchmark Price which are effective
Februari 2023. from 27 February 2023.
Pada tanggal 11 Agustus 2023, KESDM On 11 August 2023, the MoEMR issued
menerbitkan Keputusan Menteri No. 227.K/ Ministerial Decree No.227.K/MB.01/
MB.01/MEM.B/2023 tentang Pedoman MEM.B/2023 regarding the Guidelines for the
Penetapan Harga Patokan Untuk Penjualan Determination of Benchmark Prices for the
Komoditas Batubara, yang sejak tanggal tersebut Sale of Coal Commodity, which revoked
mencabut Keputusan Menteri Ministerial Decree No. 41.K/MB.01/MEM.B/
No. 41.K/MB.01/MEM.B/2023. Keputusan 2023 from that date. Ministerial Decree
Menteri No. 227.K/MB.01/MEM.B/2023 mengatur No.227.K/MB.01 /MEM.B/2023 stipulates:
terkait: (i) formula-formula baru untuk (i) new formulas for the calculation of the Coal
perhitungan Harga Batubara Acuan dan Harga Reference Price and the Coal Benchmark
Patokan Batubara, serta (ii) penetapan Price, and (ii) the determination of the
spesifikasi acuan dan perhitungan Harga Jual reference specification and calculation of the
Batubara untuk Penyediaan Tenaga Listrik untuk Selling Price of Coal for the Supply of
kepentingan umum dan Pemenuhan Kebutuhan Electricity for the public interest and to
Bahan Baku/Bahan Bakar Industri di dalam Fulfilment of the Raw Materials/Fuels Needs
negeri selain Industri Pengolahan dan/atau for Domestic Industry other than the Metal
Pemurnian Mineral Logam, yang berlaku sejak Mineral Processing and/or Refining Industry,
tanggal 11 Agustus 2023. which are effective from 11 August 2023.
l. Keputusan Menteri No. 267.K/MB.01/ l. Ministerial Decree No. 267.K/MB.01/MEM.B/
MEM.B/2022 dan Keputusan Menteri 2022 and Ministerial Decree
No.399.K/MB.01/MEM.B/2023 No.399.K/MB.01/MEM.B/2023
Pada tanggal 21 November 2022, KESDM On 21 November 2022, MoEMR issued
mengeluarkan Keputusan Menteri Ministerial Decree No. 267.K/MB.01/MEM.B/
No. 267.K/MB.01/MEM.B/2022 tentang 2022 regarding Fulfilment of Domestic Coal
Pemenuhan Kebutuhan Batubara Dalam Needs (“Ministerial Decree No. 267.K/MB.01/
Negeri (“Keputusan Menteri No. 267.K/MB.01 MEM.B/2022”), which revoked Ministerial
/MEM.B/2022”), yang mencabut Keputusan Decree No. 139.K/HK.02/MEM.B/2021
Menteri No. 139.K/HK.02/MEM.B/2021 tentang concerning Meeting Domestic Coal Needs and
Pemenuhan Kebutuhan Batubara Dalam Negeri Ministerial Decree No. 13.K/HK.021/MEM.B/
dan Keputusan Menteri No. 2022 concerning Guidelines for Imposing
13.K/HK.021/MEM.B/2022 tentang Pedoman Administrative Sanctions, Prohibiting Coal
Pengenaan Sanksi Administratif, Pelarangan Sales to Abroad, and Imposing Fines and
Penjualan Batubara ke Luar Negeri, dan Compensation Funds to Meet Domestic Coal
Pengenaan Denda serta Dana Kompensasi Needs.
Pemenuhan Kebutuhan Batubara Dalam Negeri.
Page 160
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/139 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
l. Keputusan Menteri No. 267.K/MB.01/ l. Ministerial Decree No. 267.K/MB.01/MEM.B/
MEM.B/2022 dan Keputusan Menteri 2022 and Ministerial Decree
No.399.K/MB.01/MEM.B/2023 (lanjutan) No.399.K/MB.01/MEM.B/2023 (continued)
Keputusan Menteri No. 267.K/MB.01/MEM.B/ Ministerial Decree No. 267.K/MB.01/MEM.B/
2022 antara lain mengatur terkait: (i) penetapan 2022 stipulates among others: (i) the
persentase penjualan batubara untuk kebutuhan percentage of coal sales for domestic needs of
dalam negeri sebesar 25% (dua puluh lima 25% (twenty five percent) of the planned
persen) dari rencana jumlah produksi batubara annual coal production volume as stated in the
tahunan sebagaimana tercantum dalam initial approval of Annual Work Plan and
persetujuan awal Rencana Kerja dan Anggaran Budget (Rencana Kerja dan Anggaran Biaya
Biaya Tahunan (“RKAB”), atau perubahannya Tahunan or “RKAB”), or the amendment to the
yang disetujui oleh Pemerintah, yang mana yang RKAB, approved by the Government,
lebih tinggi, (ii) kewajiban pembayaran denda whichever is higher, (ii) obligation to pay fines
dan dana kompensasi atas tidak terpenuhinya and/or compensation funds for non-fulfilment
kewajiban pemenuhan kebutuhan dalam negeri of domestic market obligation (DMO), (iii)
(DMO), (iii) sanksi administratif termasuk administrative sanctions including export ban,
larangan ekspor batubara, (iv) harga jual (iv) coal sales price of US$70 per metric tonne
batubara sebesar AS$70 per metrik ton kapal FOB vessel for supplying coal for electricity
FOB untuk pasokan listrik untuk kepentingan provided in the public interest, and (v)
publik, serta (v) penugasan untuk pemenuhan assignment to meet domestic coal needs in an
kebutuhan batubara dalam negeri pada keadaan emergency condition.
darurat.
Pada tanggal 17 November 2023, KESDM On 17 November 2023, MoEMR issued
mengeluarkan Keputusan Menteri No. Ministerial Decree No.399.K/MB.01/
399.K/MB.01/MEM.B/2023 terkait Perubahan MEM.B/2023 regarding Amendments to the
atas Keputusan Menteri No. 267.K/MB.01/ Ministerial Decree No. 267.K/MB.01
MEM.B/2022 (“Keputusan Menteri /MEM.B/2022 ("Ministerial Decree No. 399
No.399.K/MB.01/MEM.B/2023”), yang antara .K/MB.01/MEM.B/2023”), which among others
lain mengatur: (i) penetapan persentase stipulates: (i) percentage of coal sales for
penjualan batubara untuk kebutuhan dalam domestic market obligations (DMO) at 25%
negeri (DMO) sebesar 25% (dua puluh lima (twenty five percent) of actual production in the
persen) dari realisasi produksi pada tahun current year, (ii) eliminating the obligation to
berjalan, (ii) penghapusan kewajiban pay fines and only subject to the obligation to
pembayaran denda dan hanya dikenakan pay compensation funds for non-fulfilment of
kewajiban pembayaran dana kompensasi atas obligations to meet domestic market
tidak terpenuhinya kewajiban pemenuhan obligations (DMO), (iii) changes to the
kebutuhan dalam negeri (DMO), (iii) perubahan calculation formula of compensation funds and
formula perhitungan dana kompensasi dan (iv) (iv) imposition of compensation fund
pengenaan kewajiban dana kompensasi untuk obligations to meet domestic coal needs in
pemenuhan kebutuhan batubara dalam negeri 2022 are implemented in accordance with the
tahun 2022 dilaksanakan sesuai dengan provisions of this Ministerial Decree.
ketentuan Keputusan Menteri ini.
Pada tanggal 23 Desember 2024, MC dan LC On 23 December 2024, MC and LC has
telah menerima tagihan dana kompensasi tahun received the compensation fund invoices for
2023 dari KESDM masing-masing sebesar 2023 from the MoEMR amounting to
AS$8.186.368 dan AS$717.536 berdasarkan US$8,186,368 and US$717,536, respectively,
surat No. B-2987/MB.06/DBN.PL/2024 dan surat based on the letter No. B-2987/MB.06/
No. B-3001/MB.06/DBN.PL/2024. MC dan LC DBN.PL/2024 and letter No. B-3001/MB.06/
telah membayar tagihan tersebut tanggal 15 DBN.PL/2024. MC and LC had paid the
Januari 2025. invoices on 15 January 2025.
Grup akan senantiasa berupaya memenuhi The Group will continue to strive to meet its
kewajibannya sebagaimana diatur dalam obligations as stipulated in the Ministerial
Keputusan Menteri No. 267.K/MB.01/MEM.B/ Decree No. 267.K/MB.01/MEM.B/2022 as
2022 sebagaimana diubah dengan Keputusan amended by Ministerial Decree No.
Menteri No. 399.K/MB.01/MEM.B/ 2023. 399.K/MB.01/MEM.B/2023.
m. Keputusan Menteri No. 58.K/HK.02/MEM.B/ m. Ministerial Decree No. 58.K/HK.02/MEM.B/
2022 2022
Pada tanggal 23 Maret 2022, KESDM On 23 March 2022, the MoEMR issued
mengeluarkan Keputusan Menteri No. Ministerial Decree No.58.K/HK.02/MEM.B/2022
58.K/HK.02/MEM.B/2022 tentang Harga Jual regarding the Selling Price of Coal to Fulfil
Batubara Untuk Pemenuhan Kebutuhan Bahan Domestic Needs for Industrial Raw
Baku/Bahan Bakar Industri di Dalam Negeri. Materials/Fuels.
Page 161
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/140 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
m. Keputusan Menteri No. 58.K/HK.02/MEM.B/ m. Ministerial Decree No. 58.K/HK.02/MEM.B/
2022 (lanjutan) 2022 (continued)
Keputusan Menteri ini antara lain mengatur This Ministerial Decree, among other things,
harga jual batubara untuk pemenuhan bahan regulates the selling price of coal to meet the
baku/bahan bakar industri di dalam negeri domestic needs for raw material/ industrial fuel
sebesar AS$90 per metrik ton kapal FOB (untuk at US$90 per metric tonne FOB vessel (for
batubara dengan spesifikasi sebagaimana diatur coal with specifications as stipulated in the
dalam Keputusan Menteri). Penetapan harga jual Ministerial Decree). The selling price of coal to
batubara untuk pemenuhan bahan baku/bahan meet the needs of domestic industrial raw
bakar industri di dalam negeri tidak berlaku atas materials/fuels does not apply to the metal
industri pengolahan dan/atau pemurnian mineral mineral processing and/or refining industry.
logam.
Keputusan Menteri ini mulai berlaku pada This Ministerial Decree came into effect on
tanggal 1 April 2022 dan mencabut Keputusan 1 April 2022 and revoked Ministerial Decree
Menteri No. 206.K/HK.02/MEM.B/2021 tentang No. 206.K/HK.02/MEM.B/2021 concerning the
Harga Jual Batubara untuk Pemenuhan Selling Price of Coal for Fulfilment of the Raw
Kebutuhan Bahan Baku/Bahan Bakar Industri Material/Fuel for the Cement and Fertiliser
Semen dan Pupuk di Dalam Negeri. Domestic Industry.
Manajemen berpendapat bahwa implementasi Management believes that the implementation
Keputusan Menteri ini tidak berdampak signifikan of this Ministerial Decree will not have a
terhadap penjualan dan kinerja keuangan Grup. significant impact on the Group's sales and
financial performance.
n. Peraturan Pemerintah No. 15/2022 n. Government Regulation No. 15/2022
Pada tanggal 11 April 2022, Pemerintah On 11 April 2022, the Government issued
menerbitkan Peraturan Pemerintah No. 15/2022 Government Regulation No. 15/2022, on the
tentang perlakuan perpajakan dan/atau PNBP di Treatment of Taxation and/or PNBP in the coal
bidang usaha pertambangan batubara, yang mining sector, which regulates among others,
diantaranya mengatur sebagai berikut: the following:
- Tarif PNBP berupa penjualan hasil tambang - The PNBP rate for sales of mining products
per ton dihitung berdasarkan formula yang per tonne is calculated based on the
diatur dalam peraturan ini dengan tarif formula stipulated in this regulation at a
sebesar 14% sampai dengan 28% (dikalikan rate of 14% to 28% (multiplied by the
harga jual), tergantung dengan Harga selling price), depending on the applicable
Batubara Acuan (“HBA”) yang berlaku, Coal Reference Price (“HBA”), minus the
dikurangi tarif iuran produksi/royalti batubara tariff for contribution of production/royalty
dan dikurangi tarif pemanfaatan BMN eks for Coal and minus the tariff for utilisation
PKP2B dari hasil produksi per ton (0,21% of BMN ex-PKP2B from production yield
dikalikan harga jual). per tonne (0.21% multiplied by the selling
price).
- PNBP bagian Pemerintah Pusat sebesar 4% - PNBP for the Central Government's share
dan bagian Pemerintah Daerah sebesar 6% of 4% and Local Government’s portion of
dari keuntungan bersih pemegang IUPK 6% of the net profit of IUPK holders for the
sebagai Kelanjutan Operasi Continuation of Contract/Agreement
Kontrak/Perjanjian, sesuai dengan ketentuan Operations, in accordance with the
peraturan perundang-undangan di bidang provisions of laws and regulations in the
pertambangan mineral dan batubara pada field of mineral and coal mining at the time
saat IUPK sebagai Kelanjutan Operasi the IUPK for the Continuation of
Kontrak/Perjanjian diterbitkan. Contract/Agreement Operations is issued.
- PNBP di bidang lingkungan hidup dan - PNBP in the field of environmental and
kehutanan sesuai dengan ketentuan forestry in accordance with the provisions
peraturan perundang-undangan di bidang of the laws and regulations in the field of
PNBP yang berlaku pada saat IUPK sebagai applicable PNBP at the time the IUPK as
Kelanjutan Operasi Kontrak/Perjanjian Continuation of Operation
diterbitkan. Contract/Agreement is issued..
- Tarif PPh Badan sebesar 22%. - CIT rate of 22%.
- Pajak bumi dan bangunan sesuai dengan - Land and building tax in accordance with
ketentuan peraturan perundang-undangan di the provision of the laws and regulations in
bidang pajak bumi dan bangunan yang the field of land and building tax applicable
berlaku pada saat IUPK sebagai Kelanjutan at the time the IUPK as Continuation of
Operasi Kontrak/Perjanjian diterbitkan. Operation Contract/Agreement is issued.
Page 162
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/141 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
n. Peraturan Pemerintah No. 15/2022 (lanjutan) n. Government Regulation No. 15/2022
(continued)
Berdasarkan IUPK sebagai Kelanjutan Operasi Based on the IUPK for the Continuation of
Kontrak/Perjanjian AI (Catatan 1c), AI wajib Contract Operations/Agreement of AI (Note
membayar pendapatan negara dan pendapatan 1c), AI is required to pay state revenue and
daerah sesuai dengan jenis, tarif, serta tata cara regional revenue according to the type, tariff,
pengenaan, pemungutan, dan pembayaran/ and procedures for imposition, collection, and
penyetoran pada tahun berikutnya setelah tahun payment/deposit in the following year after the
IUPK sebagai Kelanjutan Operasi Kontrak/ year of IUPK for the Continuation of Contract/
Perjanjian diterbitkan sesuai dengan ketentuan Agreement Operation issued in accordance
peraturan perundang-undangan, dalam hal ini with statutory provisions, in this case for AI,
untuk AI adalah sejak 1 Januari 2023. from 1 January 2023.
AI telah mengimplementasikan ketentuan dalam AI has implemented the provisions of this
peraturan ini sejak 1 Januari 2023. regulation since 1 January 2023.
o. Peraturan Pemerintah No. 26/2022 o. Government Regulation No. 26/2022
Pada tanggal 15 Agustus 2022, Pemerintah On 15 August 2022, the Government issued
menerbitkan Peraturan Pemerintah No. 26/2022 Government Regulation No. 26/2022,
tentang Jenis dan Tarif atas Jenis PNBP yang concerning Types and Tariffs for Types of
berlaku pada KESDM, antara lain mengatur PNBP that apply to the MoEMR, which among
penerimaan pemanfaatan sumber daya alam others regulates receipts from the use of
mineral dan batubara, seperti: (i) iuran tetap natural mineral and coal resources, such as: (i)
untuk IUP dan IUPK Operasi Produksi Mineral fixed contribution rate of IUP and IUPK Mineral
Logam dan Batubara sebesar and Production Operations amounting to
Rp60.000/hektar/tahun; dan IUP dan IUPK Rp60,000/hectare/year; and IUP and IUPK
Eksplorasi Mineral Logam dan Batubara sebesar Mineral and Coal Exploration amounting to
Rp30.000/hektar/tahun, (ii) iuran produksi/royalti Rp30,000/hectare/year; (ii) contribution of
untuk batubara (Open pit) berdasarkan tingkat production/royalty for Coal (Open pit) ranging
kalori dan level HBA antara 5,0% sampai 13,5% based on calorie and HBA level at a
dari harga per metrik ton; (iii) iuran percentage ranging from 5.0% to 13.5% of the
produksi/royalti untuk batubara (underground) price per metric-tonne; (iii) contribution of
berdasarkan tingkat kalori dan level HBA antara production/royalty for coal (underground)
4,0% sampai 12,5% dari harga per metrik ton. ranging based on calorie and HBA level at a
percentage ranging from 4.0% to 12.5% of the
price per metric-tonne.
Grup terus memonitor perkembangan peraturan The Group is closely monitoring the progress
ini dan akan mempertimbangkan dampak of this regulation and will consider the impact
terhadap operasi Grup, jika ada. on the Group’s operations, if any.
p. Undang-Undang No. 6 Tahun 2023 p. Law No. 6 of 2023 (“Law No. 6/2023”)
(“UU No. 6/2023”)
Pada tanggal 31 Maret 2023, telah diundangkan On 31 March 2023, Law No. 6 of 2023 which
UU No. 6/2023 yang menetapkan Perppu No. stipulated Perppu No. 2/2022 became law.
2/2022 menjadi Undang-Undang. Perppu No. Perppu No. 2/2022 was enacted on 30
2/2022 telah ditetapkan pada tanggal 30 Desember December 2022 as a follow up to the
2022 sebagai tindak lanjut Putusan Mahkamah Constitutional Court Decision No. 91/PUU-
Konstitusi No. 91/PUU-XVIII/2020 yang XVIII/2020 which mandates improvements to
mengamanatkan perbaikan atas UU No. 11/2020, Law 11/2020, where amendments and
di mana perubahan dan penggantian yang replacements were made among others,
dilakukan, diantaranya, mengenai peningkatan regarding improvements to the investment
ekosistem investasi dan kegiatan berusaha, ecosystem and business activities, employment,
ketenagakerjaan, kemudahan berusaha, ease of doing business, encouragement to
dukungan riset dan inovasi, pengadaan tanah, dan research and innovation, land acquisition, and
kawasan ekonomi. Dengan berlakunya UU No. economic zones. With the enactment of Law No.
6/2023, terkonfirmasi bahwa UU No. 11/2020 6/2023, Law No. 11/2020 is revoked and no
dicabut dan dinyatakan tidak berlaku. Manajemen longer valid. Management believes that the
berpendapat bahwa implementasi UU No. 6/2023 implementation of Law No. 6/2023 has no
tidak memiliki dampak signifikan pada kinerja significant impact on the Group’s financial
keuangan Grup. performance.
Page 163
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/142 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
q. Peraturan Pemerintah No. 50 tahun 2022 q. Government Regulation No. 50 of 2022
Pada tanggal 12 Desember 2022, Pemerintah On 12 December 2022, the Government issued
telah menerbitkan Peraturan Pemerintah No. 50 Government Regulation No. 50 of 2022 (“GR
tahun 2022 (“PP No. 50/2022”) tentang Tata Cara No. 50/2022”) concerning Procedures for the
Pelaksanaan Hak dan Pemenuhan Kewajiban Implementation of Rights and Fulfilment of Tax
Perpajakan. Obligations.
PP No. 50/2022 mengatur tentang pembaruan GR No. 50/2022 stipulates renewal of
pelaksanaan hak dan pemenuhan kewajiban implementation of rights and fulfilment of tax
perpajakan yang bertujuan untuk memberikan obligations, which aims to provide more legal
kepastian hukum, keadilan, kemudahan dan certainty, justice, ease and clarity to the public in
kejelasan kepada masyarakat dalam memahami understanding the implementation of tax rights
ketentuan mengenai pelaksanaan hak dan and the fulfilment of obligations, such as
pemenuhan kewajiban perpajakan, meliputi provisions for Tax Identity Number registration
ketentuan pendaftaran Nomor Pokok Wajib and integration of population data with taxation
Pajak dan integrasi data kependudukan dengan data, implementation of tax rights and the
data perpajakan, pelaksanaan hak dan fulfilment of obligations electronically, as well as
pemenuhan kewajiban perpajakan secara provisions regarding the implementation of
elektronik, serta ketentuan mengenai pelaksanaan rights and the fulfilment of obligations in carbon
hak dan pemenuhan kewajiban pajak karbon. tax. Management believes that the
Manajemen berpendapat bahwa implementasi implementation of this regulation will not have a
peraturan ini tidak akan berdampak signifikan significant impact on the Group’s financial
terhadap kinerja keuangan Grup. performance.
r. Peraturan Pemerintah No. 55 tahun 2022 r. Government Regulation No. 55 of 2022
Pada tanggal 20 Desember 2022, Pemerintah On 20 December 2022, the Government issued
telah menerbitkan Peraturan Pemerintah No. 55 Government Regulation No. 55 of 2022 (“GR
tahun 2022 (“PP No. 55/2022”) tentang No. 55/2022”) concerning the Adjustments to the
Penyesuaian Pengaturan dibidang Pajak Regulations in the field of Income Taxes.
Penghasilan.
PP No. 55/2022 mengatur antara lain administrasi GR No. 55/2022 regulates, among other things,
perpajakan bagi Wajib Pajak dengan peredaran tax administration for taxpayers with a certain
bruto tertentu dalam jangka waktu tertentu, gross income within a certain period of time,
pengecualian dari objek Pajak Penghasilan exemptions from income tax (“PPh”) objects,
(“PPh”), biaya yang dapat dikurangkan dari costs that can be deducted from gross income
penghasilan bruto dan penurunan tarif PPh bagi and reduced PPh rates for public companies that
Perusahaan Terbuka yang memenuhi persyaratan meet certain requirements. Management
tertentu. Manajemen berpendapat bahwa believes that the implementation of this
implementasi peraturan ini tidak berdampak regulation has no significant impact on the
signifikan terhadap kinerja keuangan Grup. Group’s financial performance.
s. Peraturan Menteri Lingkungan Hidup dan s. Regulation of the Minister of Environment
Kehutanan No. 21/2022 and Forestry No. 21/2022
Pada tanggal 21 September 2022, Kementerian On 21 September 2022, the Ministry of
Lingkungan Hidup dan Kehutanan telah Environment and Forestry issued Ministerial
menerbitkan Peraturan Menteri No. 21/2022 Regulation No. 21/2022 ("Permen LHK
("Permen LHK 21/2022”) tentang Tata Laksana 21/2022”) concerning the Implementation of
Penerapan Nilai Ekonomi Karbon (“NEK”). Carbon Economic Values (“NEK”).
Peraturan ini diantaranya mengatur mengenai This regulation regulates, among others,
penyelenggaraan NEK melalui berbagai implementation of the NEK through various
mekanisme, salah satunya melalui perdagangan mechanisms, one of which is through carbon
karbon, baik dalam negeri maupun luar negeri; trading, both domestically and abroad;
pengukuran, pelaporan dan verifikasi measurement, reporting and verification of
penyelenggaraan NEK; dan sertifikat NEK implementation; and a certificate of
pengurangan emisi gas rumah kaca. Peraturan reducing greenhouse gas emissions. This
ini juga mengatur ketentuan yang harus dipenuhi regulation also stipulates conditions that must
oleh para pelaku usaha untuk dapat melakukan be met by business actors to be able to carry
perdagangan karbon. out carbon trading.
Grup memonitor perkembangan implementasi The Group is closely monitoring the
peraturan tersebut secara ketat dan akan implementation of the regulations and will
mempertimbangkan dampak terhadap operasi consider the impact on the Group’s operations,
Grup, jika ada. if any.
Page 164
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/143 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
t. Perjanjian Pembelian Tenaga Listrik (“PPTL”) t. Long-term Power Purchase Agreement
Jangka Panjang untuk Proyek Pembangkit (“PPA”) for the Central Java Coal-Fired
Listrik Bertenaga Uap Swasta di Jawa Tengah Steam Power Plant Independent Power
Producer (“IPP”) Project in Central Java
Perusahaan, bersama-sama dengan Electric The Company, together with Electric Power
Power Development Co Ltd (“Jpower”) dan Development Co Ltd (“Jpower”) and Itochu
Itochu Corporation (“Itochu”), membentuk Corporation (“Itochu”), formed a consortium –
Konsorsium “Jpower-Adaro-Itochu” untuk the “Jpower-Adaro-Itochu” Consortium – to
melaksanakan pengembangan proyek undertake the development of coal-fired steam
pembangkit listrik bertenaga uap berkapasitas power plant 2x1,000 MW project in Batang
2x1.000 MW di Kabupaten Batang, Provinsi Jawa Regency, the Province of Central Java. In July
Tengah. Pada bulan Juli 2011, Konsorsium 2011, the Consortium established BPI, in
mendirikan BPI, dimana Grup, melalui entitas which the Group, through its subsidiary, AP,
anak perusahaannya, AP, Jpower dan Itochu Jpower and Itochu own participating interests
mempunyai partisipasi kepemilikan masing- of 34%, 34% and 32%, respectively, to build,
masing sebesar 34%, 34%, dan 32%, untuk own, operate and transfer a coal-fired steam
membangun, memiliki, mengoperasikan dan power plant.
mengalihkan pembangkit listrik bertenaga uap.
Pada tanggal 6 Oktober 2011, BPI dan On 6 October 2011, BPI and PLN signed a
PLN menandatangani PPTL jangka panjang. long-term PPA. The PPA includes the
PPTL ini mencakup pembangunan pembangkit construction of a coal-fired steam power plant
listrik bertenaga uap berkapasitas 2x1.000 MW di with a total capacity of 2x1,000 MW in Batang
kabupaten Batang, Provinsi Jawa Tengah Regency, the Province of Central Java (CJPP)
(CJPP) dan penyediaan listrik ke PLN selama 25 and a 25-year supply of electricity to PLN.
tahun. Proyek CJPP akan ditransfer ke PLN pada Upon expiration of the PPA term, the CJPP
saat PPTL berakhir. Selain itu, Perjanjian project will be transferred to PLN. In addition to
Penjaminan juga telah ditandatangani oleh dan the PPA, a Guarantee Agreement was also
antara Pemerintah yang diwakili oleh Menteri signed by and between the Government
Keuangan Republik Indonesia, PT Penjaminan represented by the Minister of Finance of the
Infrastruktur Indonesia (Persero) (“PII”), dan BPI, Republic of Indonesia, PT Penjaminan
pada tanggal 6 Oktober 2011 dan dalam hal ini, Infrastruktur Indonesia (Persero) (“PII”) and
Pemerintah dan PII memberikan jaminan BPI, on 6 October 2011, and in this case, the
pembayaran PLN kepada BPI yang diatur dalam Government and PII guaranteed PLN’s
PPTL. Tanggal efektif Perjanjian Penjaminan payment obligations for BPI under the PPA.
dimulai pada tanggal pembiayaan yaitu pada The effective date of the Guarantee
tanggal 6 Juni 2016 dan akan berlaku sampai Agreement starts from the financing date
dengan 21 tahun setelah Tanggal Operasi which is 6 June 2016 and shall be effective
Komersial Proyek atas Proyek CJPP. until 21 years after the Project Commercial
Operation Date (“PCOD”) of CJPP Project.
Pada tanggal 6 April 2016, BPI menandatangani On 6 April 2016, BPI signed Amendment No. 7
Amandemen No. 7 terhadap PPTL yang to the PPA which extends the required
memperpanjang tanggal pembiayaan yang financing date under the PPA to 6 June 2016.
dipersyaratkan berdasarkan PPTL menjadi 6 Juni
2016.
Pada tanggal 13 April 2016, BPI dan PLN kembali On 13 April 2016, BPI and PLN signed
menandatangani Amandemen No. 8 atas PPTL Amendment No. 8 to the PPA, which regulates
yang mengatur mengenai kewajiban PLN untuk PLN’s obligation to acquire the State Reserved
mengakuisisi Tanah Cadangan Umum Negara Land for the development of the CJPP project
untuk pembangunan proyek CJPP dan kewajiban and BPI and PLN obligations to enter into a
BPI dan PLN untuk menandatangani Perjanjian Land Lease Agreement with respect to the
Sewa Tanah sehubungan dengan plot-plot tanah 125,146 m2 plots of land acquired by PLN
sebesar 125.146 m2 yang diakuisisi oleh PLN pursuant to Law No. 2 of 2012 and Land
berdasarkan UU No. 2 Tahun 2012 dan Utilisation Agreement with respect to the State
Perjanjian Penggunaan Tanah sehubungan Reserved Land.
dengan Tanah Cadangan Umum Negara.
Pada tanggal 14 April 2016, BPI dan PLN On 14 April 2016, BPI and PLN signed the
menandatangani Perjanjian Sewa Tanah Land Lease Agreement with respect to Law
sehubungan dengan UU No. 2 Tahun 2012 dan No. 2 of 2012 and the Land Utilisation
Perjanjian Penggunaan Tanah sehubungan Agreement with respect to the State Reserved
dengan Tanah Cadangan Umum Negara. Land. Through the signing of the Land Lease
Dengan ditandatanganinya Perjanjian Sewa Agreement and the Land Utilisation
Tanah dan Perjanjian Penggunaan Tanah Agreement, all required land for the
tersebut, seluruh tanah yang diperlukan untuk development of the CJPP project has been
pembangunan proyek CJPP telah diperoleh. acquired.
Page 165
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/144 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
t. Perjanjian Pembelian Tenaga Listrik (“PPTL”) t. Long-term Power Purchase Agreement
Jangka Panjang untuk Proyek Pembangkit (“PPA”) for the Central Java Coal-Fired
Listrik Bertenaga Uap Swasta di Jawa Tengah Steam Power Plant Independent Power
(lanjutan) Producer (“IPP”) Project in Central Java
(continued)
Pada tanggal 11 Mei 2016, BPI dan PLN On 11 May 2016, BPI and PLN signed
menandatangani Amandemen No. 9 atas PPTL Amendment No. 9 to the PPA with respect to
sehubungan dengan penerapan Peraturan Bank the implementation of Bank Indonesia
Indonesia No. 17/3/PBI/2015 tentang Kewajiban Regulation No. 17/3/PBI/2015 regarding the
Penggunaan Rupiah di Wilayah Negara Mandatory Use of Rupiah within the Territory
Kesatuan Republik Indonesia. of the Republic of Indonesia.
Pada tanggal 6 Juni 2016, BPI telah mencapai On 6 June 2016, BPI achieved the financing
tanggal pembiayaan sebagaimana date as required by the PPA.
dipersyaratkan oleh PPTL.
Pada tanggal 30 Agustus 2021, BPI dan PLN On 30 August 2021, BPI and PLN signed the
menandatangani Amandemen dan Pernyataan Amendment and Restatement Agreement
Kembali Perjanjian sehubungan dengan PPTL, relating to the PPA, which among others
yang antara lain menunda Tanggal Operasi defers the required Commercial Operation
Komersial dan Tanggal Operasi Komersial Dates and Required Project Commercial
Proyek yang Disyaratkan menjadi di tahun 2022. Operation Date to 2022. The CJPP first unit
Unit pertama CJPP telah menyelesaikan was commissioned and began commercial
komisioning dan mulai beroperasi secara operations on 15 August 2022, while the CJPP
komersial sejak 15 Agustus 2022, sedangkan unit second unit was commissioned and began
kedua CJPP telah menyelesaikan komisioning commercial operations on 31 August 2022.
dan mulai beroperasi secara komersial sejak
31 Agustus 2022.
u. PPTL untuk Proyek IPP Pembangkit Listrik u. PPA for the South Kalimantan Coal-Fired
Bertenaga Uap di Kalimantan Selatan Steam Power Plant IPP Project
Perusahaan, bersama-sama dengan Korea East- The Company, together with Korea East-West
West Power Co, Ltd, membentuk konsorsium Power Co, Ltd, formed a consortium with
dengan partisipasi kepemilikan participation interests of 65% and 35%,
masing-masing sebesar 65% dan 35%. Pada respectively. On 12 August 2013, the
tanggal 12 Agustus 2013, konsorsium mendirikan consortium established TPI to build, own,
TPI untuk membangun, memiliki, operate and transfer a coal-fired steam power
mengoperasikan, dan mengalihkan pembangkit plant.
listrik bertenaga uap.
Pada tanggal 15 Oktober 2014, TPI dan PLN On 15 October 2014, TPI and PLN signed a
menandatangani PPTL jangka panjang. PPTL ini long-term PPA. The PPA contemplates,
mencakup antara lain, keahlian teknik, among others, the engineering, construction,
pembangunan, kepemilikan dan operasi ownership, and operation of a coal-fired steam
pembangkit listrik bertenaga uap berkapasitas power plant with a total capacity of 2x100 MW
2x100 MW di Provinsi Kalimantan Selatan (South in the Province of South Kalimantan (South
Kalimantan Power Plant/“SKPP”) dan Kalimantan Power Plant/“SKPP”) and a 25-
penyediaan listrik ke PLN selama 25 tahun. year supply of electricity to PLN. Upon the
Proyek SKPP akan ditransfer ke PLN pada saat expiration of the PPA term, the SKPP project
PPTL berakhir. Proyek ini termasuk dalam will be transferred to PLN. This project is
Proyek Fast Track Program tahap 2 (FTP-2) included in the Fast Track Programme Project
dengan skema Build, Own, Operate and Transfer phase 2 (FTP-2), with the Build, Own, Operate
(“BOOT”). Proyek ini memperoleh fasilitas and Transfer (“BOOT”) scheme. This Project
penjaminan Pemerintah melalui Menteri obtained support from the Government,
Keuangan Republik Indonesia dalam bentuk represented by the Minister of Finance of the
Surat Jaminan Kelayakan Usaha (“SJKU”) yang Republic of Indonesia (“MoF”) in the form of a
diterbitkan tanggal 3 Januari 2017. Tanggal Business Viability Guarantee Letter (“BVGL”)
efektif SJKU dimulai pada tanggal pembiayaan dated 3 January 2017. The BVGL effective
dan akan berlaku sampai dengan 17 tahun date commences on the financing date and
setelah Tanggal Operasi Komersial sesuai shall be effective until 17 years after the COD
dengan PPA. pursuant to the PPA.
Page 166
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/145 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
u. PPTL untuk Proyek IPP Pembangkit Listrik u. PPA for the South Kalimantan Coal-Fired
Bertenaga Uap di Kalimantan Selatan Steam Power Plant IPP Project (continued)
(lanjutan)
Pada tanggal 18 November 2016, TPI dan PLN On 18 November 2016, TPI and PLN signed
menandatangani Amandemen No. 1 atas PPTL Amendment No. 1 to the PPA concerning the
yang mengatur perubahan tentang prosedur invoicing and payment procedures and the
penagihan dan pembayaran dan format surat form of PLN consent letter.
persetujuan PLN.
Pada tanggal 24 Januari 2017, TPI mencapai On 24 January 2017, TPI achieved the
tanggal pembiayaan sebagaimana financing date as required by the PPA. The
dipersyaratkan oleh PPTL. Unit pertama SKPP SKPP first unit was commissioned and began
telah menyelesaikan komisioning dan mulai commercial operations on 23 September 2019,
beroperasi secara komersial sejak 23 while the SKPP second unit was
September 2019, sedangkan unit kedua SKPP commissioned and began commercial
telah selesai komisioning dan mulai beroperasi operations on 14 December 2019.
secara komersial sejak 14 Desember 2019.
Pada tanggal 30 Oktober 2023, TPI dan PLN On 30 October 2023, TPI and PLN signed the
menandatangani amandemen No. 2 atas PPTL Amendment No. 2 to the PPA concerning the
yang mengatur perubahan tentang implementasi implementation of VAT on coal for the
PPN atas batubara untuk perhitungan calculation of component C.
komponen C.
v. Proses hukum v. Legal proceedings
Kasus gugatan lahan Land lawsuit case
Pada tanggal 2 September 2024, Adaro, LSA, On 2 September 2024, Adaro, LSA, SIS, SCM
SIS, SCM dan PT Cakradenta Agung Pertiwi and PT Cakradenta Agung Pertiwi (a third
(pihak ketiga) menerima gugatan ganti rugi dari party) received a lawsuit for damages from
Hariyadi sebagai penggugat terkait penguasaan Hariyadi as the plaintiff, related to the control
dan pemanfaatan lahan dengan total gugatan and utilisation of land, with a total claim
sebesar Rp3 triliun, beserta uang paksa sebesar amounting to Rp3 trillion, along with a coercive
Rp5 juta per hari apabila lalai atau terlambat fine of Rp5 million per day in the event of failure
melaksanakan putusan. Sampai dengan laporan or delay in executing the judgment. As of the
keuangan konsolidasian diterbitkan, proses date the consolidated financial statements
persidangan atas gugatan ini masih were issued, the court proceedings for this
berlangsung. lawsuit are still ongoing.
Grup (beserta ventura bersamanya) dari waktu From time to time, the Group (including its joint
ke waktu terlibat dalam berbagai tuntutan hukum ventures) is involved in various legal
yang dapat mempengaruhi kegiatan bisnis Grup. proceedings as a normal consequence of the
Grup berkeyakinan bahwa keputusan yang tidak Group’s business. The Group is of the opinion
menguntungkan sehubungan dengan tuntutan that adverse decisions in any pending or
hukum yang sedang berjalan, atau keharusan threatened proceedings, or any amounts it may
untuk membayar sejumlah ganti rugi dari be required to pay by reason thereof, are
tuntutan hukum tersebut, kemungkinan besar unlikely to have a material adverse effect on its
tidak akan mempengaruhi kondisi keuangan financial condition or the consolidated results
atau hasil operasi konsolidasian secara material. of operations.
w. Perjanjian Pinjaman dengan KIKI w. Loan Agreement with KIKI
Pada tanggal 30 Agustus 2021, ATBI On 30 August 2021, ATBI entered into a Loan
mengadakan Perjanjian Pinjaman sebesar Agreement of Rp150,000,000,000 (full
Rp150.000.000.000 (nilai penuh) dengan KIKI. amount) with KIKI. This loan facility will be
Fasilitas pinjaman ini digunakan untuk used for land acquisition in the business of
pembebasan tanah dalam usaha pendirian establishing an industrial area in North
Kawasan industri di Kalimantan Utara (“Proyek”) Kalimantan (the “Project”) and the
dan pengembangan kegiatan usaha KIKI. development of KIKI’s business operations.
Fasilitas pinjaman ini dikenakan suku bunga This loan facility bears fixed interest at a
tetap sebesar persentase tertentu per tahun dan certain percentage per annum and will be due
akan jatuh tempo dalam jangka waktu 2 tahun within 2 years from the first loan drawdown
sejak tanggal dilakukannya pencairan pinjaman date of the facility.
pertama.
Page 167
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/146 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
w. Perjanjian Pinjaman dengan KIKI (lanjutan) w. Loan Agreement with KIKI (continued)
Sebelum atau pada tanggal jatuh tempo, Prior to or on the maturity date, part or all of
sebagian atau seluruh pinjaman yang belum the unpaid loan can be converted by ATBI into
dibayar dapat dikonversi oleh ATBI menjadi shares, with terms and conditions to be agreed
saham, dengan persyaratan dan ketentuan yang upon in the future, unless otherwise
akan disepakati kemudian, kecuali ditentukan determined by the parties.
lain oleh para pihak.
Konversi pinjaman hanya akan dilakukan atas Loan conversion will be carried out only on
pinjaman yang belum dibayarkan oleh KIKI, loans that have not been repaid by KIKI, while
sementara untuk bunga pinjaman harus interest on loans must be paid by KIKI. This
dibayarkan oleh KIKI. Fasilitas ini tidak diikat facility is not bound by any collateral.
dengan jaminan apapun.
Pada tanggal 30 Agustus 2023, KIKI telah On 30 August 2023, KIKI has fully repaid this
melakukan pelunasan atas fasilitas pinjaman loan facility amounted to Rp120,000,000,000
tersebut sebesar Rp120.000.000.000 (nilai (full amount) or equivalent to US$7,862, and
penuh) atau setara AS$7.862, dan sejak tanggal since that date, this loan facility has been
tersebut, fasilitas pinjaman ini sudah berakhir. ended.
Pada tanggal 2 Desember 2021, ATBI On 2 December 2021, ATBI entered into a
menandatangani Perjanjian Pinjaman sebesar Loan Agreement of Rp948,000,000,000 (full
Rp948.000.000.000 (nilai penuh) dengan KIKI. amount) with KIKI. On 17 March 2022,
Pada tanggal 17 Maret 2022, dilakukan Amendment I was made to the agreement to
Amandemen I atas perjanjian tersebut untuk change the total amount of the loan facility to
mengubah jumlah fasilitas pinjaman menjadi Rp1,026,000,000,000 (full amount). On 28
sebesar Rp1.026.000.000.000 (nilai penuh). July 2022, amendment II was made to change
Pada tanggal 28 Juli 2022, dilakukan the total amount of the loan facility to
amandemen II atas perjanjian tersebut untuk Rp1,164,000,000,000 (full amount).
mengubah jumlah fasilitas pinjaman menjadi
sebesar Rp1.164.000.000.000 (nilai penuh)..
Pada tanggal 8 Desember 2023, dilakukan On 8 December 2023, Amendment III was
amandemen III atas perjanjian tersebut untuk made to extend the term of agreement to five
memperpanjang jangka waktu perjanjian years from the first drawdown date of the
menjadi lima tahun sejak tanggal dilakukannya facility.
pencairan pinjaman pertama.
Fasilitas pinjaman ini dikenakan suku bunga This loan facility bears a fixed interest rate at a
tetap sebesar persentase tertentu. Fasilitas certain percentage. The loan facility is
pinjaman ini diikat dengan jaminan berupa gadai guaranteed by the share pledge of
saham KIKI yang dimiliki oleh PT Kawasan KIKI owned by PT Kawasan Industri Hijau
Industri Hijau Indonesia. Pinjaman akan Indonesia. The loan will be used for the
digunakan untuk biaya pembangunan Proyek, Project’s development cost, land purchase
pembelian tanah dan/atau kompensasi and/or land compensation and other costs
pembebasan tanah dan biaya-biaya lain yang related to the Project. The drawdown of the
terkait dengan Proyek. Pencairan pinjaman loan is subject to the fulfilment of certain
bergantung pada pemenuhan kondisi-kondisi conditions.
tertentu.
Selama tahun 2024, ATBI telah memberikan During 2024, ATBI has provided additional
tambahan pencairan atas pinjaman ke KIKI atas loans to KIKI amounted to Rp1,000,000,000
fasilitas pinjaman ini sebesar Rp1.000.000.000 (full amount) or equivalent to US$61
(nilai penuh) atau setara dengan AS$61 (2023: Rp33,000,000,000 (full amount) or
(2023: Rp33.000.000.000 (nilai penuh) atau equivalent to US$2,158). As at 31 December
setara dengan AS$2.158). Pada tanggal 31 2024, the outstanding balance of this loan
Desember 2024, saldo pinjaman yang terutang facility was Rp121,360,000,000 (full amount)
atas fasilitas pinjaman ini adalah sebesar or equivalent to US$7,115
Rp121.360.000.000 (nilai penuh) atau setara (2023: Rp227,360,000,000 (full amount) or
dengan AS$7.115 (2023: Rp227.360.000.000 equivalent to US$14,748) (Note 14).
(nilai penuh) atau setara dengan AS$14.748)
(Catatan 14).
Page 168
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/147 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
x. Perjanjian Pinjaman dengan KIPI x. Loan Agreement with KIPI
Pada tanggal 2 Desember 2021, ATBI On 2 December 2021, ATBI entered into a
menandatangani Perjanjian Pinjaman sebesar Loan Agreement of Rp2,513,725,000,000 (full
Rp2.513.725.000.000 (nilai penuh) dengan KIPI. amount) with KIPI. On 17 March 2022,
Pada tanggal 17 Maret 2022, dilakukan Amendment I was made to the agreement to
Amandemen I atas perjanjian tersebut untuk change the total amount of the loan facility to
mengubah jumlah fasilitas pinjaman menjadi Rp2,635,725,000,000 (full amount). On 28
sebesar Rp2.635.725.000.000 (nilai penuh). July 2022, Amendment II was made to the
Pada tanggal 28 Juli 2022, dilakukan agreement to change the total amount of the
Amandemen II atas perjanjian tersebut untuk loan facility to Rp3,184,725,000,000 (full
mengubah jumlah fasilitas pinjaman menjadi amount).
sebesar Rp3.184.725.000.000 (nilai penuh).
Pada tanggal 8 Desember 2023, dilakukan On 8 December 2023, Amendment III was
Amandemen III atas perjanjian tersebut untuk made to extend the term of agreement to five
memperpanjang jangka waktu perjanjian menjadi years from the first drawdown date of the
lima tahun sejak tanggal dilakukannya pencairan facility.
pinjaman pertama.
Pinjaman akan digunakan antara lain untuk The loan will be used among others to fund the
mendanai pembangunan, pengembangan dan construction, development and management of
pengelolaan kawasan industri di Kalimantan an industrial area in North Kalimantan (the
Utara (“Proyek”), pembelian tanah dan/atau “Project”), land purchase and/or land
kompensasi pembebasan tanah dan biaya-biaya compensation and other costs related to the
lain yang terkait dengan Proyek. Pencairan Project. The drawdown of the loan is subject to
pinjaman bergantung pada pemenuhan kondisi- the fulfilment of certain conditions.
kondisi tertentu.
Fasilitas pinjaman ini dikenakan suku bunga tetap This loan facility bears a fixed interest rate at a
sebesar persentase tertentu per tahun. Fasilitas certain percentage per annum. The loan facility
pinjaman ini diikat dengan jaminan berupa gadai is guaranteed by the share pledge of
saham KIPI yang dimiliki oleh PT Kawasan KIPI owned by PT Kawasan Industri
Industri Kalimantan Asri. Kalimantan Asri.
Selama tahun 2024, ATBI telah memberikan During 2024, ATBI has provided additional
tambahan pencairan atas pinjaman ke KIPI atas loans to KIPI amounted to Rp142,000,000,000
fasilitas pinjaman ini sebesar (full amount) or equivalent to US$9,201
Rp142.000.000.000 (nilai penuh) atau setara (2023: Rp216,000,000,000 (full amount) or
dengan AS$9.201 (2023: Rp216.000.000.000 equivalent to US$14,133). As at 31 December
(nilai penuh) atau setara dengan AS$14.133). 2024, the outstanding balance of this loan
Pada tanggal 31 Desember 2024, saldo facility was Rp2,392,180,000,000 (full amount)
pinjaman yang terutang atas fasilitas pinjaman or equivalent to US$144,215 (2023:
ini adalah sebesar Rp2.392.180.000.000 (nilai Rp2,250,180,000,000 (full amount) or
penuh) atau setara dengan AS$144.215 (2023: equivalent to US$145,964) (Note 14).
Rp2.250.180.000.000 (nilai penuh) atau setara
dengan AS$145.964) (Catatan 14).
y. Perjanjian Pembelian Tenaga Listrik - y. Power Purchase Agreement - Tanah Laut
Pembangkit Listrik Tenaga Bayu di Tanah Wind Farm
Laut
Pada tanggal 4 Mei 2023, Total Eren S.A. On 4 May 2023, Total Eren S.A. with AP and
bersama dengan AP dan PT Pembangkitan PT Pembangkitan Jawa Bali Investasi signed
Jawa Bali Investasi menandatangani Perjanjian a Power Purchase Agreement with PT PLN
Pembelian Tenaga Listrik dengan PT PLN (Persero) for the Tanah Laut Wind Farm.
(Persero) untuk PLTB Tanah Laut.
Page 169
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/148 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
z. Peraturan Pemerintah No. 36 Tahun 2023 z. Government Regulation No. 36 of 2023
(“PP No. 36/2023”) (“GR No. 36/2023”)
Pada tanggal 12 Juli 2023, Pemerintah On 12 July 2023, the Government issued GR
menerbitkan PP No. 36/2023 tentang Devisa No. 36/2023 concerning Foreign Exchange
Hasil Ekspor (“DHE”) dari Kegiatan Export Proceeds (“DHE”) from Natural
Pengusahaan, Pengelolaan, dan/atau Resources (“SDA”) Business Management
Pengolahan Sumber Daya Alam (“SDA”), and/or Processing Activities which revoked
dimana mencabut Peraturan Pemerintah Nomor the Government Regulation No. 1 of 2019 on
1 Tahun 2019 tentang Devisa Hasil Ekspor dari Foreign Exchange Export Proceeds from
Kegiatan Pengusahaan, Pengelolaan, dan/atau Natural Resources Business, Management
Pengolahan Sumber Daya Alam, dan mulai and/or Processing Activities, became effective
berlaku pada tanggal 1 Agustus 2023. on 1 August 2023.
PP No. 36/2023 mengatur tentang kewajiban GR No. 36/2023 regulates the obligation to
memasukkan devisa berupa DHE SDA ke dalam place foreign exchange in the form of DHE
sistem keuangan Indonesia melalui penempatan SDA into the financial system in Indonesia
ke dalam Rekening Khusus DHE SDA pada through placement into a DHE SDA Special
Lembaga Pembiayaan Ekspor Indonesia Account at Indonesian Export Financing
dan/atau Bank yang Melakukan Kegiatan Usaha Institutions and/or Banks Conducting
dalam Valuta Asing. DHE SDA yang telah Business Activities in Foreign Currency. DHE
dimasukkan dan ditempatkan ke dalam SDA that has been placed into a DHE SDA
Rekening Khusus DHE SDA wajib tetap Special Account must remain placed at least
ditempatkan paling sedikit sebesar 30% dan 30% for a minimum of 3 (three) months after
paling singkat 3 (tiga) bulan sejak penempatan placement in the DHE SDA Special Account.
dalam Rekening Khusus DHE SDA.
MC, LC, AI dan MIP telah melaksanakan MC, LC, AI and MIP have carried out the
kewajibannya untuk menempatkan DHE SDA ke obligations to place DHE SDA into the DHE
dalam Rekening Khusus DHE SDA SDA Special Account as required by the
sebagaimana dipersyaratkan dalam peraturan applicable laws and regulations, and is
perundang-undangan yang berlaku, dan presented as part of “Cash and Cash
disajikan sebagai bagian dari “Kas dan Setara Equivalents” in the consolidated statements of
Kas” dalam laporan posisi keuangan financial position.
konsolidasian.
Pada tanggal 17 Februari 2025, Pemerintah On 17 February 2025, the Government of
Indonesia telah mengubah PP No. 36/2023 Indonesia has amended GR No. 36/2023 by
dengan menerbitkan Peraturan Pemerintah No. issuing Government Regulation No. 8 of 2025
8 Tahun 2025 (“PP No. 8/2025”), yang akan (“GR No. 8/2025”), which will come into effect
berlaku pada tanggal 1 Maret 2025. Berdasarkan on 1 March 2025. Based on GR No. 8/2025,
PP No. 8/2025, DHE SDA yang telah DHE SDA that has been placed into the DHE
dimasukkan dan ditempatkan ke dalam SDA Special Account must remain placed at
Rekening Khusus DHE SDA menjadi wajib tetap 100% and for a minimum of 12 (twelve)
ditempatkan sebesar 100% dan paling singkat months since the placement in the DHE SDA
12 (dua belas) bulan sejak penempatan dalam Special Account. DHE SDA which has been
Rekening Khusus DHE SDA. DHE SDA yang placed in the DHE SDA Special Account can
telah di tempatkan ke dalam Rekening Khusus be used for several things as stipulated in GR
DHE SDA tersebut dapat digunakan untuk No. 8/2025. The Group continues to monitor
beberapa hal sebagaimana diatur dalam PP No. the progress of the implementation and the
8/2025. Grup terus memonitor perkembangan impact of this regulation on the Group's
implementasi dan dampak dari peraturan ini operations, if any.
terhadap operasi Grup, jika ada.
aa. Perjanjian Pinjaman dengan PSM aa. Loan Agreement with PSM
Pada tanggal 6 Desember 2023, ATCI On 6 December 2023, ATCI entered into a
menandatangani perjanjian pinjaman dengan loan agreement with PSM, where ATCI
PSM, dimana ATCI memberikan fasilitas provided a loan facility amounting to
pinjaman sebesar Rp376.687.500.000 (nilai Rp376,687,500,000 (full amount) or
penuh) atau setara dengan AS$24.500 kepada equivalent to US$24,500 to PSM. PSM has
PSM. PSM telah melakukan penarikan seluruh fully drawdown this loan facility on 8
jumlah fasilitas pinjaman ini pada tanggal 8 December 2023. This loan facility will be used
Desember 2023. Fasilitas pinjaman ini akan for general corporate purposes.
digunakan untuk tujuan umum korporasi.
Page 170
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/149 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
aa. Perjanjian Pinjaman dengan PSM (lanjutan) aa. Loan Agreement with PSM (continued)
Fasilitas pinjaman ini dikenakan tingkat suku This loan facility bears fixed interest rate at a
bunga tetap dengan persentase tertentu per certain percentage per annum and will be due
tahun dan akan jatuh tempo dalam waktu 6 within 6 (six) months from the date of the first
(enam) bulan sejak tanggal penarikan pinjaman loan drawdown, or such other date as
pertama, atau tanggal lainnya yang ditentukan determined by ATCI. Based on this
oleh ATCI. Berdasarkan perjanjian ini, pinjaman agreement, this loan is guaranteed by a
ini dijaminkan dengan gadai atas seluruh saham pledge over all PSM’s shares and may be
PSM dan dapat diberikan jaminan lebih lanjut provided with further pledge of shares from
atas saham dari pihak berelasi lainnya. other related parties.
Pada tanggal 5 Maret 2024, ATCI On 5 March 2024, ATCI entered into an
menandatangani Amandemen dan Pernyataan Amendment and Restatement of Loan
Kembali Perjanjian Pinjaman tertanggal 6 Agreement dated 6 December 2023 with PSM,
Desember 2023 dengan PSM, dimana ATCI whereby ATCI provided an additional loan
memberikan tambahan fasilitas pinjaman facility to PSM amounting to
kepada PSM sebesar Rp150.000.000.000 (nilai Rp150,000,000,000 (full amount). PSM has
penuh). PSM telah melakukan penarikan seluruh fully drawdown this additional loan facility on
tambahan fasilitas pinjaman ini pada tanggal 8 March 2024.
8 Maret 2024.
Pada tanggal 17 September 2024, perjanjian On 17 September 2024, this loan agreement
pinjaman ini telah kembali diamandemen untuk was amended to extend the loan maturity date
memperpanjang tanggal jatuh tempo pinjaman to become 30 June 2025.
menjadi tanggal 30 Juni 2025.
Pada tanggal 31 Desember 2024, saldo As at 31 December 2024, the total outstanding
pinjaman yang terutang dari fasilitas pinjaman ini balance of this loan facility was
adalah sebesar Rp526.687.500.000 (nilai penuh) Rp526,687,500,000 (full amount) or
atau setara dengan AS$32.588 (2023: equivalent to US$32,588 (2023:
Rp376.687.500.000 (nilai penuh) atau setara Rp376,687,500,000 (full amount) or
dengan AS$24.435) (Catatan 14). equivalent to US$24,435) (Note 14).
ab. Peraturan Menteri Keuangan No. 131 Tahun ab. Minister of Finance Regulation No. 131
2024 (“PMK 131/2024”) of 2024 ("PMK 131/2024")
Pada tanggal 31 Desember 2024, Menteri On 31 December 2024, the Minister of
Keuangan Republik Indonesia telah Finance of the Republic of Indonesia enacted
mengesahkan PMK 131/2024 tentang Perlakuan PMK 131/2024 concerning the Treatment of
Pajak Pertambahan Nilai (PPN) atas Impor Value Added Tax (VAT) on the Import of
Barang Kena Pajak, Penyerahan Barang Kena Taxable Goods, Delivery of Taxable Goods,
Pajak, Penyerahan Jasa Kena Pajak, Delivery of Taxable Services, Utilization of
Pemanfaatan Barang Kena Pajak Tidak Intangible Taxable Goods from Outside the
Berwujud dari Luar Daerah Pabean di Dalam Customs Area within the Customs Area, and
Daerah Pabean, dan Pemanfaatan Jasa Kena Utilization of Taxable Services from Outside
Pajak dari Luar Daerah Pabean di Dalam Daerah the Customs Area within the Customs Area,
Pabean, yang mulai berlaku pada tanggal which comes into effect on 1 January 2025.
1 Januari 2025
PMK 131/2024 ini menetapkan tarif PPN menjadi PMK 131/2024 sets the VAT rate at 12%, for
12% untuk barang kena pajak yang tergolong taxable luxury goods in the form of motor
mewah berupa kendaraan bermotor, hunian vehicles, luxury residences (luxury houses,
mewah (rumah mewah, apartemen, apartments, condominiums, townhouses),
kondominium, town house), pesawat udara, aircraft, hot air balloons, firearm ammunition,
balon udara, peluru senjata api, dan kapal pesiar. and yachts.
Selain barang kena pajak yang tergolong mewah Aside from taxable goods that are classified as
sebagaimana di atas,PPN dihitung dengan cara luxury as mentioned above, VAT is calculated
mengalikan tarif 12% dengan Dasar Pengenaan by multiplying the 12% rate by the Dasar
Pajak berupa Nilai Lain sebesar 11/12 dari nilai Pengenaan Pajak in a form of Nilai Lain
impor, harga jual atau penggantian (tidak amounting to 11/12 of the import value, selling
termasuk untuk penyerahan barang dan/atau price, or compensation (excluding the supply
jasa kena pajak dengan menggunakan dasar of taxable goods and/or services using a tax
pengenaan pajak nilai lain dan besaran tertentu base in the form of nilai lain and besaran
yang ketentuannya telah diatur dalam peraturan tertentu, as separately stipulated under tax
perundang-undangan di bidang perpajakan laws and regulations), which renders the
secara tersendiri), sehingga tarif efektif PPN effective VAT rate remains 11%.
tetap 11%.
Page 171
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/150 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
41. PERJANJIAN PENTING, IKATAN, DAN 41. SIGNIFICANT AGREEMENTS, COMMITMENTS
KONTINJENSI (lanjutan) AND CONTINGENCIES (continued)
ac. Peraturan Menteri Keuangan Nomor 136 ac. Minister of Finance Regulation Number 136
Tahun 2024 (“PMK 136/2024”) of 2024 ("PMK 136/2024")
Pada tanggal 31 Desember 2024, Menteri On 31 December 2024, the Minister of
Keuangan telah mengesahkan PMK 136/2024 Finance of the Republic of Indonesia enacted
tentang Pengenaan Pajak Minimum Global PMK 136/2024 regarding Imposition of Global
Berdasarkan Kesepakatan Internasional. Minimum Tax Based on International
Agreements.
PMK 136/2024 telah diberlakukan di Indonesia, PMK 136/2024 was enacted in Indonesia, the
yurisdiksi di mana Perusahaan didirikan, dan jurisdiction in which the Company is
akan mulai berlaku pada 1 Januari 2025. Karena incorporated, and will come into effect from 1
PMK 136/2024 belum efektif pada tanggal January 2025. Since the PMK 136/2024 was
pelaporan, Grup tidak memiliki eksposur pajak not effective at the reporting date, the Group
terkait saat ini. Grup menerapkan pengecualian has no related current tax exposure. The
untuk mengakui dan mengungkapkan informasi Group applies the exception to recognising
tentang aset dan kewajiban pajak tangguhan and disclosing information about deferred tax
yang terkait dengan pajak penghasilan Pilar Dua, assets and liabilities related to Pillar Two
sebagaimana diatur dalam amandemen PSAK income taxes, as provided in the amendments
No. 212 yang diterbitkan pada Desember 2023. to SFAS No 212 issued in December 2023.
Grup sedang dalam proses menilai apakah The Group is in the process of assessing
mereka termasuk dalam cakupan model Pilar whether they are within the scope of Pillar Two
Dua dan apakah ada eksposur terhadap PMK model and if there is any exposure to the PMK
136/2024 ketika mulai berlaku. Karena 136/2024 for when it comes into effect. Due to
kompleksitas dalam penerapan PMK 136/2024 the complexities in applying the PMK
dan perhitungan pendapatan GloBE, dampak 136/2024 and calculation GloBE income, the
kuantitatif dari PMK 136/2024 yang telah quantitative impact of the enacted PMK
diberlakukan belum dapat diperkirakan secara 136/2024 is not yet reasonably estimate.
wajar.
42. JAMINAN REKLAMASI DAN PENUTUPAN 42. RECLAMATION GUARANTEES AND MINE
TAMBANG CLOSURE
Pada tanggal 20 Desember 2010, Pemerintah On 20 December 2010, the Government released
mengeluarkan peraturan implementasi atas Undang- an implementing regulation for Mining Law No.
Undang Mineral No. 4/2009, yaitu PP No. 78 yang 4/2009, i.e. GR No. 78 dealing with reclamation and
mengatur aktivitas reklamasi dan pascatambang post-mining activities for both IUP-Exploration and
untuk pemegang IUP-Eksplorasi dan IUP-Operasi IUP-Production Operation holders. The transitional
Produksi. Ketentuan peralihan dalam PP No. 78 provisions in GR No. 78 make it clear that
menegaskan bahwa para pemegang PKP2B juga CCA/CCoW holders are also required to comply with
wajib mematuhi peraturan ini. this regulation.
Pemegang IUP-Eksplorasi, ketentuannya antara lain, An IUP-Exploration holder, among other
harus memuat rencana reklamasi di dalam rencana requirements, must include a reclamation plan in its
kerja dan anggaran biaya eksplorasinya dan exploration work plan and budget and provide a
menyediakan jaminan reklamasi berupa deposito reclamation guarantee in the form of a time deposit
berjangka yang ditempatkan pada bank pemerintah. placed at a state-owned bank.
Pemegang IUP-Operasi Produksi, ketentuannya An IUP-Production Operation holder, among other
antara lain, harus menyiapkan (1) rencana reklamasi requirements, must (1) prepare a five-year
lima tahunan; (2) rencana pascatambang; reclamation plan; (2) prepare a post-mining plan;
(3) menyediakan jaminan reklamasi yang dapat (3) provide a reclamation guarantee which may be
berupa rekening bersama atau deposito berjangka in the form of a joint account or time deposit placed
yang ditempatkan pada bank pemerintah, bank at a state-owned bank, a bank guarantee, or an
garansi, atau cadangan akuntansi (bila memenuhi accounting provision (if it meets the requirements);
persyaratan); dan (4) menyediakan jaminan and (4) provide a post-mine guarantee in the form of
pascatambang berupa deposito berjangka yang a time deposit at a state-owned bank.
ditempatkan di bank pemerintah.
Penempatan jaminan reklamasi dan jaminan The requirement to provide a reclamation guarantee
pascatambang tidak menghilangkan kewajiban and a post-mining guarantee does not release the
pemegang IUP dari ketentuan untuk melaksanakan IUP holder from the requirement to perform
aktivitas reklamasi dan pascatambang. reclamation and post-mining activities.
Page 172
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/151 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
42. JAMINAN REKLAMASI DAN PENUTUPAN 42. RECLAMATION GUARANTEES AND MINE
TAMBANG (lanjutan) CLOSURE (continued)
Pada tanggal 3 Mei 2018, KESDM mengeluarkan On 3 May 2018, the MoEMR issued Ministerial
Peraturan Menteri No. 26/2018 (“Permen ESDM Regulation No. 26/2018 (“Permen ESDM 26/2018”)
26/2018”) mengenai prinsip pertambangan dan regarding proper mining principles and supervision
pengawasan yang tepat dalam aktivitas pertambangan in mineral and coal mining activities, and on 7 May
mineral dan batubara, dan pada tanggal 7 Mei 2018, 2018, the MoEMR issued Ministerial Decree No.
KESDM mengeluarkan Keputusan Menteri No. 1827 1827 K/30/MEM/2018 (“Kepmen ESDM”) regarding
K/30/MEM/2018 (“Kepmen ESDM”) mengenai guidelines for proper mining techniques and
pedoman untuk teknik dan prinsip pertambangan yang principles. As of the effective date of these
tepat. Pada tanggal peraturan ini berlaku efektif, regulations, Ministerial Regulation No. 07/2014
Peraturan Menteri No. 07/2014 mengenai reklamasi regarding mine reclamation and post-mining
dan pascatambang pada kegiatan usaha activities in mineral and coal mining activities was
pertambangan mineral dan batubara dicabut dan tidak revoked and is no longer valid. From time to time, the
berlaku lagi. Dari waktu ke waktu, entitas-entitas AMC, AMC entities, AI, PC, RC, PCS, SCM, LSA, MIP, and
AI, PC, RC, PCS, SCM, LSA, MIP dan BEE dapat BEE can review or revise existing plans, including
melakukan peninjauan atau revisi terhadap rencana- reclamation and post-mining plans in accordance
rencana yang telah ada, termasuk diantaranya adalah with the applicable regulations.
rencana reklamasi dan pascatambang sesuai
ketentuan yang berlaku.
Kepmen ESDM No. 1827 K/30/MEM/2018 Kepmen ESDM No. 1827 K/30/MEM/2018 states
menyatakan bahwa perusahaan wajib memberikan that a company is required to provide mine
jaminan reklamasi dan pascatambang yang dapat reclamation and post-mining guarantees which may
berupa deposito berjangka, garansi bank, atau be in form of a time deposit, bank guarantee or
cadangan akuntansi yang semuanya mempunyai accounting reserve, all of which have a duration
jangka waktu sesuai dengan jadwal reklamasi. corresponding to the reclamation schedule.
Tabel dibawah ini menunjukkan jaminan reklamasi The below table sets out reclamation guarantees
yang diwajibkan dan ditempatkan oleh Grup pada that are required and have been placed by the Group
tanggal 31 Desember 2024 dan 2023 adalah sebagai as at 31 December 2024 and 2023:
berikut:
Perusahaan/ Surat Keputusan/Decree Periode/ Jumlah penempatan/Placed amount
Bentuk/Form
Entity Period
Nomor/Number Tanggal/Date 2024 2023
Dalam Rupiah (nilai penuh)/In Rupiah (full amount)
LC B-1406/MB.07/DJB.T/ 4 April 2022 2022 Rp2,555,416,000 Rp2,555,416,000 Deposito berjangka/
2022 Time deposits
KC 935/30/DJB/2015 26 Juni/June 2015 2015-2016 Rp1,728,181,592 Rp1,728,181,592 Deposito berjangka/
1049/37.06/DJB.2018 25 Juni/June 2018 2018-2019 Time deposits
1228/37.06/DJB/2019 5 Juli/July 2019 2019-2020
SBC 938/30/DJB/2015 26 Juni/June 2015 2015-2016 Rp1,577,857,027 Rp1,577,857,027 Deposito berjangka/
1240/37.06/DJB/2019 8 Juli/July 2019 2019-2020 Time deposits
JC 1048/37.06/DJB.2018 25 Juni/June 2018 2018-2019 Rp4,722,665,500 Rp4,722,665,500 Deposito berjangka/
1227/37.06/DJB/2019 5 Juli/July 2019 2019-2020 Time deposits
AI 467/30/DJB/2013 19 Maret/ 2013-2017 - Rp411,827,271,342 Bank garansi/
March 2013 Bank guarantees
629/30/DJB/2013 12 April 2013
968/37.03/DBT/2014 23 April 2014
674/30/DJB/2014 25 April 2014
1178/30/DJB/2015 27 Juli/July 2015
755/30/DJB/2016 27 Mei/May 2016
1153/30/DJB/2017 31 Mei/May 2017
2776/30/DJB/2017 29 Desember/ 2018-2022
December 2017
576/37.06/DJB/2018 21 Maret/
March 2018
666/37.06/DJB/2019 27 Februari/ 2019-2022
February 2019
1120/37.06/DJB/2019 17 Juni/June 2019
221/37.06/DJB/2020 7 Februari/ 2020
February 2020
121/37/DBT.PL/2020 11 Mei/May 2020 2013-2019
B-1942/MB.07/ 20 Mei/May 2021 2013-2020
DBT.PL/2021
B-77/MB.07/DJB.T/ 6 Januari/ 2014-2020
2022 January 2022
B-3252/MB.07/ 17 Juni/June 2022 2021
DBT.PL/2022
T-485/MB.07/ 12 Oktober/ 2014-2021
MEM.B/2022 October 2022
T-231/MB.07/ 14 Maret/ 2023-2027
MEM.B/2023 March 2023
T-4135/MB.07 11 Juli/July 2023 2022
/DBT.PL/2023
Page 173
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/152 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
42. JAMINAN REKLAMASI DAN PENUTUPAN 42. RECLAMATION GUARANTEES AND MINE
TAMBANG (lanjutan) CLOSURE (continued)
Tabel dibawah ini menunjukkan jaminan reklamasi The below table sets out reclamation guarantees
yang diwajibkan dan ditempatkan oleh Grup pada that are required and have been placed by the Group
tanggal 31 Desember 2024 dan 2023 adalah sebagai as at 31 December 2024 and 2023: (continued)
berikut: (lanjutan)
Perusahaan/ Surat Keputusan/Decree Periode/ Jumlah penempatan/Placed amount
Bentuk/Form
Entity Period
Nomor/Number Tanggal/Date 2024 2023
Dalam Rupiah (nilai penuh) (lanjutan)/In Rupiah (full amount) (continued)
MIP 540/625/Pertamb/ 30 Juni/June 2014 2014-2018 - Rp1,502,688,591 Deposito bersama pada
2014 bank pemerintah/
540/3495/DESDM/ 31 Desember/ 2019-2023 - Rp7,003,825,910 Joint time deposits at
IV-1/2019 December 2019 a state-owned bank
B-998/Mb.07/ 28 Mei/May 2024 2024-2028 -
DJB.T/2024
Deposito bersama pada
BEE 540/2626/ 13 September 2016-2017 - Rp319,735,106 bank pemerintah/
Dispertamben/2016 2016 Joint time deposits at
a state-owned bank
PC 1051/37.06/DJB/2018 25 Juni/June 2018 2019-2020 - Rp2,981,083,800 Deposito berjangka/
B-1556/MB.07/DJB.T/ 28 Desember/ 2022-2023 Time deposits
2021 December 2021
RC 1047/37.06/DJB/2018 25 Juni/June 2018 2019-2020 - Rp1,290,635,000 Deposito berjangka/
B-1064/MB.07/DJB.T/ 10 Maret/ 2022-2023 Time deposits
2022 March 2022
SCM 1641/30/DJB/2016 17 November 2016 2014-2018 - Bank garansi/
2588/30/DJB/2017 30 November 2017 2017-2018 Bank guarantees
1983/37.06/DJB/2018 23 November 2018 2014-2017
2309/37.06/DJB/2018 21 Desember/ 2018
December 2018
1526/37.06/DJB/2019 11 September 2019-2023
2019
1164/37/DBT.PL/2020 3 November 2020 2014-2018 - Rp15,756,620,700 Deposito berjangka/
T-7/MB.07/MEM.B 3 Januari/ 2014-2018, Time deposits
/2023 January 2023 2019-2023
B-2404/MB.07/DJB.T/ 19 Desember/ 2019-2023
2023 December 2023
LSA 1622/30/DJB/2016 24 November 2016 2016-2020 - Rp2,974,386,900 Bank garansi/
2583/30/DJB/2017 30 November 2017 2016-2020 Bank guarantees
1913/37.06/DJB/2018 14 November 2018 2016, 2018-
2020
15/37.03/DBT/2020 6 Januari/ 2016-2020
January 2020
B-1942/MB.07/ 20 Mei/May 2021 2016,
DBT.PL/2021 2018-2020
789/MB.07.09/DJB/ 9 April 2021 2021-2025 - Rp736,681,000 Deposito berjangka/
2021 Time deposits
T-813/MB.07/MEM.B/ 7 Desember/ 2016-2020,
2022 December 2022 2021
T-808/MB.07/MEM.B/ 4 Oktober/ 2019 - 2021,
2023 October 2023 2022
T-812/MB.07/MEM.B/ 4 Oktober/ 2021 - 2025
2023 October 2023
PCS 1640/30/DJB/2016 17 November 2016 2018-2022 - - Bank garansi/
1240/37.06/DJB/2018 21 Juli/July 2018 2018-2022 Bank guarantees
2006/37.06/DJB/2019 26 November 2019 2019-2022 - Rp25,192,258,187 Deposito berjangka/
Time deposits
T-812/MB.07/MEM.B/ 7 Desember/ 2022
2022 December 2022
Dalam ribuan AS Dolar/In thousands of US Dollars
LC 2609/30/DJB/2017 6 Desember/ 2018-2021 US$3,278 US$3,273 Bank garansi/
December 2017 Bank guarantees
121/37/DBT.PL/2020 11 Mei/May 2020 2019
2244/37.06/DJB/2019 26 Desember/ 2016-2018
December 2019
198/37.06/DJB/2020 5 Februari/ 2020-2021
February 2020
1164/37/DBT.PL/2020 3 November 2020 2016-2018,
2020
B-1942/MB.07/ 20 Mei/May 2021 2019-2020
DBT.PL/2021
B-5373/MB.07/ 14 November 2021 2016-2020
DBT.PL/2021
B-3252/MB.07/ 17 Juni/June 2022 2021
DBT.PL/2022
B-6865/MB.07/ 25 November 2022 2016-2021
DBT.PL/2022
T-6974/MB.07/ 18 November 2023 2016-2021
DBT.PL/2023
B-890/MB.07/ 13 Mei/May 2024 2022-2026
DJB.T/2024
Page 174
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/153 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
42. JAMINAN REKLAMASI DAN PENUTUPAN 42. RECLAMATION GUARANTEES AND MINE
TAMBANG (lanjutan) CLOSURE (continued)
Tabel dibawah ini menunjukkan jaminan reklamasi The below table sets out reclamation guarantees
yang diwajibkan dan ditempatkan oleh Grup pada that are required and have been placed by the Group
tanggal 31 Desember 2024 dan 2023 adalah sebagai as at 31 December 2024 and 2023: (continued)
berikut: (lanjutan)
Perusahaan/ Surat Keputusan/Decree Periode/ Jumlah penempatan/Placed amount
Bentuk/Form
Entity Period
Nomor/Number Tanggal/Date 2024 2023
Dalam ribuan AS Dolar/In thousands of US Dollars (continued)
MC 2755/30/DJB/2017 28 Desember/ 2017-2021 US$11,436 US$11,098 Bank garansi/
December 2017 Bank guarantees
B-1942/MB.07/ 20 Mei/May 2021 2019-2020
DBT.PL/2021
B-5373/MB.07/ 14 November 2021 2017-2020
DBT.PL/2021
B-3252/MB.07/ 17 Juni/June 2022 2021
DBT.PL/2022
B-6865/MB.07/DBT.PL 25 November 2022 2017-2021
/2022
T-6974/MB.07/DBT.PL/2023 18 November 2023 2017-2021 Deposito berjangka/
B-595/MB.07/DBT.PL/2023 27 Maret/March 2024 2024-2026 US$1,454 US$4,715 Time deposits
B-1404/MB.07/DJB.T/ 2022 4 April 2022 2022-2026
SBC 513/MB.07.09/DJB/ 5 Maret/March 2021 2020-2024 US$158 US$158 Deposito berjangka/
2021 Time deposits
KC 537/37.06.DJB/2020 30 April 2020 2020-2024 US$499 US$499 Bank garansi/
1476/37.06/DJB/2020 8 Desember/ 2021-2024 Bank guarantees
December 2020
B-1942/MB.07/ 20 Mei/May 2021 2020
DBT.PL/2021
B-5373/MB.07/ 14 November 2021 2020
DBT.PL/2021
B-6865/MB.07/DBT.PL 25 November 2022 2020
/2022
T-6974/MB.07/DBT.PL/2023 18 November 2023 2020
JC 589/37.06/DJB/2020 13 Mei/May 2020 2020-2024 US$1,963 US$1,963 Bank garansi/
1477/37.06/DJB/2020 8 Desember/ 2021-2024 Bank guarantees
December 2020
B-1942/MB.07/ 20 Mei/May 2021 2020
DBT.PL/2021
B-5373/MB.07/ 14 November 2021 2020
DBT.PL/2021
B-6865/MB.07/DBT.PL 25 November 2022 2020
/2022
T-6974/MB.07/DBT.PL/2023 18 November 2023 2020
PC CCoW pasal/article 7 - - - US$100 Deposito berjangka/
1352/87.04/SDP/1999 8 Juli/July 1999 Time deposits
Tabel dibawah ini menunjukkan jaminan The below table sets out post-mining guarantees
pascatambang yang diwajibkan dan ditempatkan oleh that are required and have been placed by the Group
Grup pada tanggal 31 Desember 2024 dan 2023 as at 31 December 2024 and 2023:
adalah sebagai berikut:
Perusahaan/ Surat Keputusan/Decree Periode/ Jumlah penempatan/Placed amount
Bentuk/Form
Entity Period
Nomor/Number Tanggal/Date 2024 2023
Dalam Rupiah (nilai penuh)/In Rupiah (full amount)
LC 825/30/DJB/2016 8 Juni/June 2016 2016-2018 US$4,901 US$4,901 Deposito berjangka/
Time deposits
MC 627/37/DJB/2019 19 Februari/ 2020-2026 US$3,401 US$5,458 Deposito berjangka/
February 2019 Time deposits
B-737/MB.07/DJB.T/2024 22 April 2024 2018-2037
MIP 540/1042/Pertamb/ 2 Juni/June 2010 2012-2020 - Rp18,538,728,642 Deposito bersama
2010 pada bank
pemerintah/
T-243/MB.07/MEM.B/ 2023 15 Maret/ 2021-2028 - Rp3,435,103,492 Joint time
March 2023 deposits at a
state-owned
bank
BEE 545/1181/Tamben-II/ 22 November 2014-2038 - Rp6,249,876,209 Deposito bersama
2011 2011 pada bank
pemerintah/
Joint time
deposits at a
state-owned
bank
SCM 1042/MB.07.09/DJB/2021 4 Mei/May 2021 2021-2027 - Rp4,098,575,897 Deposito berjangka/
Time deposits
Page 175
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/154 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
42. JAMINAN REKLAMASI DAN PENUTUPAN 42. RECLAMATION GUARANTEES AND MINE
TAMBANG (lanjutan) CLOSURE (continued)
Tabel dibawah ini menunjukkan jaminan The below table sets out post-mining guarantees
pascatambang yang diwajibkan dan ditempatkan oleh that are required and have been placed by the Group
Grup pada tanggal 31 Desember 2024 dan 2023 as at 31 December 2024 and 2023: (continued)
adalah sebagai berikut: (lanjutan)
Perusahaan/ Surat Keputusan/Decree Periode/ Jumlah penempatan/Placed amount
Bentuk/Form
Entity Period
Nomor/Number Tanggal/Date 2024 2023
Dalam ribuan AS Dolar/In thousands of US Dollars
LSA 1040/MB.07.09/DJB/2021 4 Mei/May 2021 2021-2032 - Rp5,745,610,727 Deposito berjangka/
Time deposits
PCS B-1056/MB.07/DJB.T/ 2021 28 Oktober/ 2020-2029 - Rp1,644,379,974 Deposito berjangka/
October 2021 Time deposits
AI 279/30/DJB/2013 14 Februari/ 2014-2020 - US$27,960 Deposito berjangka/
February 2013 Time deposits
43. ASET DAN LIABILITAS KEUANGAN 43. FINANCIAL ASSETS AND LIABILITIES
Pada tanggal 31 Desember 2024, Grup As at 31 December 2024, the Group classified its
mengklasifikasikan kas dan setara kas, piutang usaha, cash and cash equivalents, trade receivables, other
piutang lain-lain, kas dan deposito berjangka yang receivables, restricted cash and time deposits, loans
dibatasi penggunaannya, pinjaman untuk pihak ketiga, to third parties, loans to related parties, other current
pinjaman untuk pihak berelasi, aset lancar lain-lain, assets, service concession receivables and other
piutang jasa konsesi dan aset tidak lancar lain-lain non-current assets amounting to US$2,984,841
sebesar AS$2.984.841 (2023: AS$4.389.023) sebagai (2023: US$4,389,023) as financial assets at
aset keuangan yang diukur pada biaya perolehan amortised cost.
diamortisasi.
Pada tanggal 31 Desember 2024, Grup As at 31 December 2024, the Group classified its
mengklasifikasikan aset keuangan pada nilai wajar financial assets at FVOCI and FVTPL amounting to
melalui penghasilan komprehensif lain dan melalui US$627,693 and US$nil, respectively (2023:
laba rugi masing-masing sebesar AS$627.693 dan US$487,691 and US$61,768, respectively).
AS$nihil (2023: masing-masing sebesar AS$487.691
dan AS$61.768).
Pada tanggal 31 Desember 2024, Grup As at 31 December 2024, the Group classified its
mengklasifikasikan utang usaha, utang dividen, beban trade payables, dividends payable, accrued
yang masih harus dibayar, pinjaman dari pihak ketiga, expenses, loans from third parties, other liabilities,
utang lain-lain, liabilitas sewa, utang bank dan Senior lease liabilities, bank loans and Senior Notes
Notes sebesar AS$1.115.782 (2023: AS$2.387.913) amounting to US$1,115,782 (2023: US$2,387,913)
sebagai liabilitas keuangan yang diukur pada biaya as financial liabilities carried at amortised cost.
perolehan diamortisasi.
44. MANAJEMEN RISIKO KEUANGAN 44. FINANCIAL RISK MANAGEMENT
Berbagai aktivitas yang dilakukan membuat Grup The Group’s activities are exposed to a variety of
terekspos terhadap berbagai risiko keuangan: risiko financial risks: market risk (including the effects of
pasar (termasuk dampak risiko nilai tukar mata uang foreign currency exchange rate risk, commodity
asing, risiko tingkat harga komoditas, dan risiko tingkat price risk and interest rate risk), credit risk and
suku bunga), risiko kredit, dan risiko likuiditas. Tujuan liquidity risk. The objectives of the Group’s risk
dari proses manajemen risiko Grup adalah untuk management processes are to identify, measure,
mengidentifikasi, mengukur, mengawasi, dan monitor and manage key risks in order to safeguard
mengelola risiko dasar dalam upaya melindungi the Group’s long-term business continuity and to
kesinambungan bisnis dalam jangka panjang dan minimise potential adverse effects on the financial
meminimalkan dampak yang tidak diharapkan pada performance of the Group.
kinerja keuangan Grup.
Grup menggunakan berbagai metode untuk mengukur The Group uses various methods to measure the
risiko yang dihadapinya. Metode ini meliputi analisis risk to which it is exposed. These methods include
sensitivitas untuk risiko tingkat suku bunga, nilai tukar sensitivity analysis in the case of interest rates,
dan risiko harga lainnya dan analisis umur piutang foreign exchange and other price risks and aging
untuk risiko kredit. analysis for credit risk.
Page 176
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/155 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
44. MANAJEMEN RISIKO KEUANGAN (lanjutan) 44. FINANCIAL RISK MANAGEMENT (continued)
(1) Faktor risiko keuangan (1) Financial risk factors
a. Risiko pasar a. Market risk
(i) Risiko nilai tukar mata uang asing (i) Foreign exchange risk
Pembiayaan dan sebagian besar The financing and the majority of the
pendapatan dan pengeluaran operasi revenue and operating expenditure of
dari entitas anak yang beroperasi dari the operating subsidiaries of the
Perusahaan didenominasi dalam mata Company are denominated in US
uang Dolar AS, yang secara tidak Dollars, which indirectly represents a
langsung merupakan lindung nilai alami natural hedging on exposure to
(natural hedging) terhadap eksposur fluctuations in foreign exchange rates.
fluktuasi nilai tukar mata uang asing. However, the Group is exposed to
Namun, Grup memiliki eksposur foreign exchange risk arising from
terhadap risiko mata uang asing yang dividend payments to the shareholders
timbul dari pembayaran dividen kepada and other operating expenses in
pemegang saham dan biaya operasi Rupiah.
lainnya dalam mata uang Rupiah.
Manajemen telah membuat kebijakan Management has set up a policy to
untuk mengelola risiko nilai tukar mata require companies within the Group to
uang asing terhadap mata uang manage their foreign exchange risk
fungsional perusahaan dalam Grup. against their functional currency. As at
Pada tanggal 31 Desember 2024, jika 31 December 2024, if Rupiah had
Rupiah melemah/menguat sebesar weakened/strengthened by 10%
10% terhadap Dolar AS dengan semua against the US Dollars with all other
variabel konstan, laba setelah variables held constant, the post-tax
pajak dalam tahun berjalan akan profit for the year would have been
menjadi lebih rendah AS$93.275 US$93,275 lower or US$114,003
atau menjadi lebih tinggi AS$114.003 higher (2023: US$46,952 lower or
(2023: lebih rendah AS$46.952 atau US$56,567 higher), respectively,
menjadi lebih tinggi AS$56.567), mainly as a result of foreign exchange
terutama diakibatkan penjabaran gains/losses on the translation of cash
keuntungan/kerugian translasi kas dan and cash equivalents, restricted cash
setara kas, kas dan deposito berjangka and time deposits, trade receivables,
yang dibatasi penggunaannya, piutang other investments, loans to third
usaha, investasi lain-lain, pinjaman parties, loans to related parties, other
untuk pihak ketiga, pinjaman untuk non-current assets, trade payables,
pihak berelasi, aset tidak lancar lain- accrued expenses, bank loan, lease
lain, utang usaha, beban yang masih liabilities and other liabilities.
harus dibayar, utang bank, liabilitas
sewa dan utang lain-lain.
(ii) Risiko harga (ii) Price risk
Operasi Grup terekspos terhadap risiko The Group’s operations are exposed to
pasar terkait dengan fluktuasi harga dari market risks related to the price
harga komoditas yang diperdagangkan volatility of commodity prices traded on
di pasar batubara dunia. Namun world coal markets. However, the
demikian, aset dan liabilitas keuangan Group’s financial assets and liabilities
Grup tidak terekspos secara signifikan are not significantly exposed to the
terhadap fluktuasi harga batubara dunia price volatility of world coal markets
karena penyelesaian aset dan liabilitas because the settlement of financial
keuangan berdasarkan harga yang assets and liabilities is based on the
tercantum dalam kontrak jual beli prices stipulated in the coal sales and
batubara yang ditentukan pada saat purchase agreements that will be
pengiriman. determined at the time of delivery.
Page 177
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/156 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
44. MANAJEMEN RISIKO KEUANGAN (lanjutan) 44. FINANCIAL RISK MANAGEMENT (continued)
(1) Faktor risiko keuangan (lanjutan) (1) Financial risk factors (continued)
a. Risiko pasar (lanjutan) a. Market risk (continued)
(ii) Risiko harga (lanjutan) (ii) Price risk (continued)
Grup terekspos risiko harga yang The Group is exposed to price risk from
berasal dari investasi yang dicatat investments that are carried at FVTPL
sebesar nilai wajar melalui laba rugi or financial assets at FVOCI and
atau aset keuangan pada nilai wajar FVTPL.
melalui penghasilan komprehensif lain
dan melalui laba rugi.
Untuk mengelola risiko harga yang To manage price risk arising from
timbul dari investasi pada efek utang, investments in debt securities, the
Grup melakukan analisa terkait Group performs an analysis of the
besarnya bunga kupon yang ditawarkan coupon rates offered on bonds and the
pada obligasi dan tingkat imbal hasil required rate of return that is generally
yang secara umum diharapkan oleh expected by the market. To manage
pasar. Untuk mengelola risiko harga the price risk arising from investments
yang timbul dari investasi efek yang in unlisted securities, the Group
tidak diperdagangkan di bursa, Grup diversifies its portfolio. The
melakukan diversifikasi portofolionya. performance of the Group’s
Kinerja investasi Grup yang diukur pada investments at FVTPL or FVOCI is
nilai wajar melalui laba rugi atau melalui monitored periodically.
penghasilan komprehensif lain
dimonitor secara periodik.
Pada tanggal 31 Desember 2024, As at 31 December 2024, if the price of
apabila harga atas investasi lain-lain the Group’s other investments at
Grup yang diukur pada nilai wajar FVOCI had been 5% higher or lower
melalui penghasilan komprehensif lain with all other variables held constant,
5% lebih tinggi atau lebih rendah total equity would have increased or
dengan asumsi variabel lainnya tidak decreased by US$31,385 (2023:
mengalami perubahan, maka total US$27,473).
ekuitas akan naik atau turun sebesar
AS$31.385 (2023: AS$27.473).
(iii) Risiko suku bunga (iii) Interest rate risk
Risiko suku bunga Grup terutama timbul The Group’s interest rate risk
dari pinjaman jangka panjang dalam arises from long-term borrowings
mata uang Dolar AS. Risiko suku bunga denominated in US Dollars. The
dari kas tidak signifikan dan semua interest rate risk on cash is not
instrumen keuangan lainnya tidak significant and all other financial
dikenakan bunga. Pinjaman yang instruments are not interest bearing.
diterbitkan dengan tingkat bunga Borrowings issued at variable rates
variabel mengekspos Grup terhadap expose the Group to cash flow interest
risiko suku bunga arus kas. rate risk.
Grup menganalisis eksposur dari risiko The Group analyses its interest rate
bunga secara dinamis. Beberapa exposure on a dynamic basis. Various
skenario disimulasikan dengan scenarios are simulated taking into
beberapa pertimbangan seperti consideration the refinancing of
pembiayaan kembali, memperbaharui existing positions, and alternative
dari kondisi yang ada dan alternatif lain financing. Based on the above
pembiayaan. Berdasarkan skenario scenarios, the Group manages its cash
tersebut diatas, Grup mengelola risiko flows interest rate risk by refinancing
arus kas dari suku bunga dengan borrowings at a lower interest rate.
melakukan pembiayaan pinjaman
dengan suku bunga yang lebih rendah.
Page 178
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/157 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
44. MANAJEMEN RISIKO KEUANGAN (lanjutan) 44. FINANCIAL RISK MANAGEMENT (continued)
(1) Faktor risiko keuangan (lanjutan) (1) Financial risk factors (continued)
a. Risiko pasar (lanjutan) a. Market risk (continued)
(iii) Risiko suku bunga (lanjutan) (iii) Interest rate risk (continued)
Pada tanggal 31 Desember 2024, jika As at 31 December 2024, if interest
tingkat suku bunga atas pinjaman rates on long-term borrowings had
jangka panjang 10 basis poin lebih been 10 basis points higher/lower with
tinggi/lebih rendah, dengan asumsi all other variables held constant, the
semua variabel lain konstan, laba post-tax profit for the year would have
setelah pajak untuk tahun berjalan akan been US$460 (2023: US$578)
menjadi lebih rendah/tinggi sebesar lower/higher.
AS$460 (2023: AS$578).
b. Risiko kredit b. Credit risk
Pada tanggal 31 Desember 2024, total As at 31 December 2024, the total
maksimum eksposur dari risiko kredit adalah maximum exposure from credit risk was
AS$3.603.047 (2023: AS$4.938.377). US$3,603,047 (2023: US$4,938,377).
Pada tanggal 31 Desember 2024, risiko As at 31 December 2024, credit risk arises
kredit terutama berasal dari kas di bank, from cash in banks, time deposits, financial
deposito berjangka, aset keuangan pada assets at FVOCI, trade receivables, other
nilai wajar melalui penghasilan komprehensif receivables, restricted cash and time
lain, piutang usaha, piutang lain-lain, kas dan deposits, loans to third parties, loans to
deposito berjangka yang dibatasi related parties, other current assets, and
penggunaannya, pinjaman untuk pihak other non-current assets. As at 31
ketiga, pinjaman untuk pihak berelasi, aset December 2023, credit risk arises from
lancar lain-lain, dan aset tidak lancar lain- cash in banks, time deposits, financial
lain. Pada tanggal 31 Desember 2023, risiko assets at FVOCI and FVTPL, trade
kredit terutama berasal dari kas di bank, receivables, other receivables, restricted
deposito berjangka, aset keuangan pada cash and time deposits, loans to third
nilai wajar melalui penghasilan komprehensif parties, loans to related parties, other
lain dan melalui laba rugi, piutang usaha, current assets, service concession
piutang lain-lain, kas dan deposito berjangka receivables and other non-current assets.
yang dibatasi penggunaannya, pinjaman
untuk pihak ketiga, pinjaman untuk pihak
berelasi, aset lancar lain-lain, piutang jasa
konsesi dan aset tidak lancar lain-lain.
Semua kas di bank, deposito berjangka, kas All cash in banks, time deposits, restricted
dan deposito berjangka yang dibatasi cash and time deposits are placed in
penggunaannya ditempatkan di bank asing reputable foreign and local banks.
dan lokal yang memiliki reputasi.
Manajemen yakin akan kemampuannya Management is confident in its ability to
untuk terus mengendalikan dan continue to control and maintain minimal
mempertahankan eksposur yang minimal exposure to credit risk, since the Group
terhadap risiko kredit mengingat Grup has clear policies on the selection of
memiliki kebijakan yang jelas dalam customers, legally binding agreements in
pemilihan pelanggan, perjanjian yang place for coal sales, mining services and
mengikat secara hukum untuk penjualan other services rendered, and historically
batubara, jasa penambangan, dan jasa low levels of bad debts in trade
lainnya yang telah dilakukan, dan secara receivables.
historis mempunyai tingkat yang rendah
untuk piutang usaha yang bermasalah.
Page 179
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/158 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
44. MANAJEMEN RISIKO KEUANGAN (lanjutan) 44. FINANCIAL RISK MANAGEMENT (continued)
(1) Faktor risiko keuangan (lanjutan) (1) Financial risk factors (continued)
b. Risiko kredit (lanjutan) b. Credit risk (continued)
Kebijakan umum Grup untuk penjualan The Group’s general policies for coal sales
batubara dan pemberian jasa untuk and rendering services to new and existing
pelanggan yang sudah ada dan pelanggan customers are as follows:
baru adalah sebagai berikut:
- memilih pelanggan dengan kondisi - selecting customers with strong
keuangan yang kuat dan reputasi yang financial conditions and good
baik. reputations.
- menerima pelanggan baru dan - acceptance of new customers and
penjualan batubara serta pemberian sales of coal and rendering services
jasa disetujui oleh pihak yang being approved by the authorised
berwenang sesuai dengan kebijakan personnel according to the Group’s
delegasi kekuasaan Grup. delegation of authority policy.
- meminta pembayaran dengan - requesting payments by Letter of Credit
menggunakan Letter of Credit untuk for new customers.
pelanggan baru.
Seluruh saldo terutang dari piutang usaha, The entire outstanding balances from trade
piutang lain-lain, pinjaman untuk pihak receivables, other receivables, loans to
ketiga, pinjaman untuk pihak berelasi, aset third parties, loans to related parties, other
lancar lain-lain dan aset tidak lancar lain-lain current assets and other non-current
di atas terutama berasal dari assets are mostly derived from
pelanggan/pihak ketiga/pihak berelasi yang customers/third parties/related parties
sudah bertransaksi dengan Grup lebih dari which have transacted with the Group for
12 bulan dan tidak memiliki sejarah more than 12 months and do not have any
wanprestasi yang material. history of material default.
c. Risiko likuiditas c. Liquidity risk
Risiko likuiditas merupakan risiko yang Liquidity risk is defined as a risk that arises
muncul dalam situasi dimana posisi arus kas in situations where the cash inflow from
Grup mengindikasikan bahwa arus kas short-term revenue is not enough to cover
masuk dari pendapatan jangka pendek tidak the cash outflow of short-term expenditure.
cukup untuk memenuhi arus kas keluar To manage its liquidity risk, the Group
untuk pengeluaran jangka pendek. Untuk monitors its level of cash and cash
mengatur risiko likuiditas, Grup memonitor equivalents and maintains these at a level
dan menjaga tingkat kas dan setara kas deemed adequate to finance the Group’s
yang diperkirakan cukup untuk mendanai operational activities and to mitigate the
kegiatan operasional Grup dan mengurangi effect of fluctuations in cash flow. The
pengaruh fluktuasi arus kas. Manajemen Group’s management also regularly
Grup juga secara rutin memonitor perkiraan monitors projected and actual cash flow,
arus kas dan arus kas aktual, termasuk profil including loan maturity profiles and
jatuh tempo pinjaman, dan secara terus- continuously assesses the financial
menerus menilai kondisi pasar keuangan markets for opportunities to raise funds. In
untuk kesempatan memperoleh dana. addition, the Group has a standby loan
Sebagai tambahan, Grup juga mengatur facility that can be drawn down upon
untuk memiliki fasilitas stand-by loan yang request to fund its operations as and when
dapat ditarik sesuai dengan permintaan needed.
untuk mendanai kegiatan operasi pada saat
diperlukan.
Page 180
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/159 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
44. MANAJEMEN RISIKO KEUANGAN (lanjutan) 44. FINANCIAL RISK MANAGEMENT (continued)
(1) Faktor risiko keuangan (lanjutan) (1) Financial risk factors (continued)
c. Risiko likuiditas (lanjutan) c. Liquidity risk (continued)
Tabel dibawah ini menganalisa liabilitas The table below analyses the Group’s
keuangan Grup pada tanggal pelaporan financial liabilities at the reporting date into
berdasarkan kelompok jatuh temponya dari relevant maturity groupings based on the
sisa periode hingga tanggal jatuh tempo remaining period to the contractual
kontraktual. Jumlah yang diungkapkan maturity date. The amounts disclosed in
dalam tabel ini adalah nilai arus kas the table represent contractual
kontraktual yang tidak terdiskonto termasuk undiscounted cash flows including
estimasi pembayaran bunga: estimated interest payments:
Lebih dari tiga Lebih dari satu
bulan dan kurang tahun dan kurang
dari satu tahun/ dari lima tahun/
Kurang dari More than More than Lebih dari
tiga bulan/ three months and one year and lima tahun/
Less than not later than not later than More than
three months one year five years five years Total
2024
Liabilitas keuangan/
Financial liabilities
Utang usaha/Trade payables 158,360 - - - 158,360
Utang dividen/Dividends payable 200,000 - - - 200,000
Beban yang masih harus dibayar/
Accrued expenses 151,668 - - - 151,668
Utang lain-lain/Other liabilities 25,909 - - - 25,909
Liabilitas sewa/Lease liabilities 8,952 25,627 101,495 2,720 138,794
Utang bank/Bank loans 13,578 53,043 398,408 153,600 618,629
Total 558,467 78,670 499,903 156,320 1,293,360
2023
Liabilitas keuangan/
Financial liabilities
Utang usaha/Trade payables 344,743 - - - 344,743
Utang dividen/Dividends payable 429,510 - - - 429,510
Beban yang masih harus dibayar/
Accrued expenses 169,160 - - - 169,160
Utang lain-lain/Other liabilities 5,244 - - - 5,244
Pinjaman dari pihak ketiga/
Loans from third parties 52 2,645 149 637 3,483
Liabilitas sewa/Lease liabilities 8,453 20,553 81,955 1,321 112,282
Utang bank/Bank loans 67,376 201,419 391,697 117,185 777,677
Senior Notes - 729,795 - - 729,795
Total 1,024,538 954,412 473,801 119,143 2,571,894
Manajemen berpendapat bahwa tidak ada Management is of the opinion that there is
masalah risiko likuiditas signifikan untuk no significant liquidity risk for the Group
Grup karena Grup memiliki modal kerja yang since the Group has positive working
positif dan arus kas operasi yang positif. capital and positive operating cash flows.
(2) Estimasi nilai wajar (2) Fair value estimation
Nilai wajar aset dan liabilitas keuangan diestimasi The fair value of financial assets and liabilities
untuk keperluan pengakuan dan pengukuran is estimated for recognition and measurement
atau untuk keperluan pengungkapan. or for disclosure purposes.
Nilai wajar adalah suatu jumlah dimana suatu The fair value is the amount for which an asset
aset dapat dipertukarkan atau suatu liabilitas could be exchanged or a liability settled
diselesaikan antara pihak yang memahami dan between knowledgeable and willing parties in
berkeinginan untuk melakukan transaksi wajar. an arm’s length transaction.
Page 181
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/160 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
44. MANAJEMEN RISIKO KEUANGAN (lanjutan) 44. FINANCIAL RISK MANAGEMENT (continued)
(2) Estimasi nilai wajar (lanjutan) (2) Fair value estimation (continued)
PSAK No. 113, “Pengukuran nilai wajar”, SFAS No. 113, “Fair value measurement”,
mensyaratkan pengungkapan atas pengukuran requires disclosure of fair value measurements
nilai wajar dengan tingkat hierarki nilai wajar through the following fair value measurement
sebagai berikut: hierarchy:
• Harga dikutip (tidak disesuaikan) dalam • Quoted prices (unadjusted) in active
pasar aktif untuk aset atau liabilitas yang markets for identical assets or liabilities
identik (Tingkat 1); (Level 1);
• Input selain harga yang dikutip dari pasar • Inputs other than quoted prices included
yang termasuk dalam Tingkat 1 yang dapat within Level 1 that are observable for the
diobservasi untuk aset atau liabilitas, baik asset or liability, either directly (that is, as
secara langsung (misalnya harga) atau prices) or indirectly (that is, derived from
secara tidak langsung (misalnya turunan dari prices) (Level 2); and
harga) (Tingkat 2); dan
• Input untuk aset atau liabilitas yang bukan • Inputs for the asset or liability that are not
berdasarkan data pasar yang dapat based on observable market data (that is,
diobservasi (informasi yang tidak dapat unobservable inputs) (Level 3).
diobservasi) (Tingkat 3).
Tabel dibawah ini menggambarkan nilai tercatat The table below describes the carrying amount
dan nilai wajar dari aset/liabilitas keuangan yang and fair value of the financial assets/liabilities
tidak disajikan Grup pada nilai wajarnya: that are not presented by the Group at fair
value:
Nilai tercatat/ Nilai wajar/
Carrying amount Fair value
2024 2024
Pinjaman untuk pihak ketiga 183,866 180,767 Loans to third parties
Pinjaman untuk pihak berelasi 140,594 146,769 Loans to related parties
Utang bank 106,583 99,914 Bank loan
2023 2023
Piutang lain-lain dari Other receivables from non-
kepentingan non-pengendali 66,600 58,839 controlling interests
Pinjaman untuk pihak ketiga 197,089 187,531 Loans to third parties
Pinjaman untuk pihak berelasi 143,637 162,719 Loans to related parties
Senior Notes 697,189 683,942 Senior Notes
Sebagian utang bank merupakan liabilitas Certain bank loans are liabilities with floating
dengan tingkat bunga mengambang, sehingga interest rates, thus the carrying amount
nilai tercatat setara dengan nilai wajar. Nilai wajar approximate their fair values. The fair value of
Senior Notes diestimasi menggunakan harga Senior Notes is estimated using the quoted
dikutip dalam pasar aktif pada tanggal market price as at 31 December 2023. Fair
31 Desember 2023. Pengungkapan nilai wajar value disclosure of Senior Notes is calculated
Senior Notes dihitung menggunakan Tingkat 1. using Level 1 input.
Pada tanggal 31 Desember 2024, nilai wajar As at 31 December 2024, the fair values of
investasi tertentu lainnya diukur menggunakan certain other investments are measured using
Tingkat 1 dari hierarki nilai wajar Level 1 of the fair value hierarchy (2023: the
(2023: nilai wajar investasi tertentu lainnya diukur fair values of certain other investments are
menggunakan Tingkat 1 dari hierarki nilai wajar, measured using Level 1 of the fair value
sedangkan aset keuangan pada nilai wajar hierarchy, while financial assets at FVOCI and
melalui penghasilan komprehensif lain dan laba FVTPL are measured using Level 3 of the fair
rugi diukur menggunakan Tingkat 3 dari hierarki value hierarchy).
nilai wajar).
Page 182
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/161 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
44. MANAJEMEN RISIKO KEUANGAN (lanjutan) 44. FINANCIAL RISK MANAGEMENT (continued)
(2) Estimasi nilai wajar (lanjutan) (2) Fair value estimation (continued)
Piutang lain-lain dari kepentingan non- Other receivables from non-controlling interest
pengendali merupakan aset tak berbunga, are non-interest bearing assets. Thus, the
sehingga nilai tercatat aset keuangannya tidak carrying amount of the financial assets does
menunjukkan nilai wajarnya. Pada tanggal not represent their fair value. As at
31 Desember 2023, piutang lain-lain dari 31 December 2023, other receivables from
kepentingan non-pengendali dihitung non-controlling interests are measured using
menggunakan Tingkat 3 dari hierarki nilai wajar. Level 3 of the fair value hierarchy.
Pada tanggal 31 Desember 2023, nilai wajar aset As at 31 December 2023, the fair value of
keuangan dari konsesi jasa menggunakan arus financial assets of service concession is
kas yang didiskontokan berdasarkan tingkat suku measured using discounted cash flows based
bunga terakhir dari aset keuangan dari proyek on the interest rate of the latest financial assets
konsesi. Pengungkapan nilai wajar aset of concession projects. Fair value disclosure of
keuangan dari proyek konsesi jasa dihitung financial assets from service concession
dengan menggunakan input Level 3. projects is calculated using Level 3 inputs.
Nilai tercatat dari aset dan liabilitas keuangan The carrying amount of other financial assets
lainnya telah berkisar menunjukkan nilai and liabilities approximate their fair values due
wajarnya karena memiliki sifat jangka pendek to the short-term nature of the financial
dari instrumen keuangannya. instruments.
Untuk tahun yang berakhir pada tanggal 31 For the year ended 31 December 2024 and
Desember 2024 dan 2023, tidak terdapat 2023, there were no transfers between levels.
pengalihan antar tingkat.
(3) Manajemen risiko permodalan (3) Capital risk management
Dalam mengelola permodalannya, Grup In managing its capital, the Group safeguards
senantiasa mempertahankan kelangsungan its ability to continue as a going concern and to
usaha serta memaksimalkan manfaat bagi maximise benefits to the shareholders and
pemegang saham dan pemangku kepentingan other stakeholders.
lainnya.
Grup secara aktif dan rutin menelaah dan The Group actively and regularly reviews and
mengelola permodalannya untuk memastikan manages its capital to ensure the optimal
struktur modal dan pengembalian yang optimal capital structure and return to the
bagi pemegang saham, dengan shareholders, taking into consideration the
mempertimbangkan efisiensi penggunaan modal efficiency of capital use based on operating
berdasarkan arus kas operasi dan belanja modal, cash flows and capital expenditure and also
serta mempertimbangkan kebutuhan modal di consideration of future capital needs.
masa yang akan datang.
Grup juga berusaha mempertahankan The Group also seeks to maintain a balance
keseimbangan antara tingkat pinjaman dan between its level of borrowing and equity
posisi ekuitas untuk memastikan struktur modal position in order to ensure the optimal capital
dan pengembalian yang optimal. Tidak ada structure and return. There were no changes
perubahan pada pendekatan Grup dalam in the Group’s approach to capital
mengelola permodalannya selama tahun management during the year.
berjalan.
Page 183
PT ALAMTRI RESOURCES INDONESIA Tbk (dahulu/formerly PT ADARO ENERGY INDONESIA Tbk)
DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES
Lampiran 5/162 Schedule
CATATAN ATAS LAPORAN KEUANGAN NOTES TO THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
31 DESEMBER 2024 DAN 2023 31 DECEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS, (Expressed in thousands of US Dollars,
kecuali dinyatakan lain) unless otherwise stated)
45. OTORISASI LAPORAN KEUANGAN 45. AUTHORISATION OF THE CONSOLIDATED
KONSOLIDASIAN FINANCIAL STATEMENTS
Laporan keuangan konsolidasian ini diotorisasi untuk These consolidated financial statements were
diterbitkan sesuai dengan resolusi Direksi Perusahaan authorised for issue in accordance with a resolution
tanggal 28 Februari 2025. of the Board of Directors of the Company on
28 February 2025.
Names mentioned 139 people and organisations named in the text · linked when the evidence is strong
unresolved
org
PT Adaro
p.4
unresolved
org
Energy Indonesia Tbk
p.4
unresolved
org
Adara Energy Indonesia Tbk
p.4 ×2
unresolved
org
Kantor Akuntan Publik Rintis
p.4
unresolved
org
Rianto & Rekan
p.4
unresolved
org
Indonesia Tbk
p.5 ×6
unresolved
org
PT Adaro Andalan
p.5 ×2
unresolved
org
PT Adara Anda
p.5
unresolved
person
Daniel Kohar
p.11
unresolved
person
Notarial Notaris Sukawaty Sumadi
· Notaris
p.22
unresolved
org
Minister of Justice
p.22
unresolved
person
Humberg Lie
p.22 ×6
unresolved
person
Crescento
p.23
unresolved
person
Michael W.P.
p.23
unresolved
person
Boards
· Komisaris
p.23
unresolved
person
Mahendra Adinegara
p.24
unresolved
person
Adinegara
p.24
unresolved
org
PT Saptaindra
p.24
unresolved
org
PT Alam Tri Bangun
p.24
unresolved
org
PT Adaro Minerals
p.24
unresolved
org
PT Adaro Clean Energy
p.24
unresolved
org
PT Adaro Power
p.25
unresolved
org
PT Dianlia
p.25
unresolved
org
PT Biscayne
p.25
unresolved
org
PT Alam Tri Cakra
p.25
unresolved
org
PT Indonesia Bulk
p.25
unresolved
org
PT Adaro Persada
p.25
unresolved
org
Singapore Pte Ltd
p.25 ×2
unresolved
org
PT Viscaya
p.25
unresolved
org
PT Sarana Daya
p.25
unresolved
org
PT Adaro Logistics
p.25
unresolved
org
PT Maritim Barito
p.25
unresolved
org
PT Makmur
p.25
unresolved
org
PT Puradika Bongkar
p.25
unresolved
org
PT Rehabilitasi
p.25
unresolved
org
PT Indonesia Multi
p.26
unresolved
org
PT Mustika Indah
p.26
unresolved
org
PT Bukit Enim
p.26
unresolved
org
PT Adaro Jasabara
p.26
unresolved
org
PT Adaro Tirta
p.26 ×6
unresolved
org
PT Agri Multi Lestari
p.26
unresolved
org
PT Paramitha Cipta
p.26
unresolved
org
PT Semesta
p.26
unresolved
org
PT Laskar Semesta
p.26
unresolved
org
PT Drupadi Tirta
p.26
unresolved
org
PT Lahai Coal
p.26
unresolved
org
PT Juloi Coal
p.26
unresolved
org
PT Sumber Barito
p.26
unresolved
org
PT Kalteng Coal
p.26
unresolved
org
PT Maruwai Coal
p.26
unresolved
org
PT Ratah Coal
p.26
unresolved
org
PT Batuan Anugerah
p.26
unresolved
org
PT Alam Sukses Lestari
p.26
unresolved
org
PT Barito Galangan
p.26
unresolved
org
PT Balangan Anugerah Semesta
p.26 ×2
unresolved
org
PT Hutan Amanah
p.27
unresolved
org
PT Adaro Wamco
p.27
unresolved
org
Adaro Australia Pty Ltd
p.27
unresolved
org
PT Alam Tri Daya
p.27
unresolved
org
PT Sarana Mekar
p.27
unresolved
org
PT Adaro Indo
p.27
unresolved
org
PT Batam Surya
p.27
unresolved
org
PT Batam Sarana
p.27
unresolved
org
PT Karimun Sarana
p.27
unresolved
org
PT Persada Wana
p.27
unresolved
org
PT Cakra Wana
p.27
unresolved
org
PT Mandiri Wana
p.27
unresolved
org
PT Kalimantan
p.27
unresolved
org
PT Kaltara Power
p.27
unresolved
org
PT Kalimantan Energi
p.27
unresolved
org
PT Pembangkit
p.27 ×6
unresolved
org
PT Mentarang Tirta
p.28
unresolved
org
PT Adaro Baterai
p.28
unresolved
org
PT Karimun Industri
p.28
unresolved
org
PT Adaro Sarana Energi
p.28
unresolved
org
PT Indoprima Niaga
p.28
unresolved
org
PT Indotama Semesta
p.28
unresolved
org
PT Indovisi Sentosa
p.28
unresolved
org
PT Mitra Rimba
p.28
unresolved
org
PT Indo Mitra
p.28
unresolved
org
PT Adaro Wind
p.28
unresolved
org
PT Jaringan Interkoneksi
p.28 ×2
unresolved
org
PT Koridor Anugerah
p.28
unresolved
org
PT Harapan Insani
p.28
unresolved
org
PT Basalt Sinar Lestari
p.28
unresolved
org
PT Bumi Alam Seraya
p.28
unresolved
org
PT Adaro Jasa Tirta
p.28
unresolved
org
Batubara Bukit Asam (Persero) Tbk
p.29
unresolved
org
PT Tambang Batubara Bukit Asam (Persero)
p.29
unresolved
org
Menteri Pertambangan dan Energi
p.29
unresolved
org
Minister of Mines
p.29
unresolved
org
Minister of Menteri Investasi
p.30
unresolved
org
Koordinasi
p.30
unresolved
org
Menteri Energi dan Sumber Daya
p.30
unresolved
org
Minister of Energy Mineral
p.30
unresolved
org
PT Pelindo Multi Terminal
p.31
unresolved
org
PT Terminal Curah Utama
p.31
unresolved
org
PT Ambang
p.31
unresolved
org
PT Ambang Barito Barito
p.31
unresolved
org
Kementerian Energi dan Sumber Daya Mineral
p.32
unresolved
org
Ministry of Energy and Mineral Resources
p.32
unresolved
org
Menteri Energi dan Sumber Daya Mineral
p.33
unresolved
org
Menteri ESDM
p.33
unresolved
org
Minister of Energy and Mineral Resources
p.33
unresolved
org
Minister of EMR
p.33
unresolved
org
Bank Indonesia
p.42 ×2
unresolved
person
KHN
p.102
unresolved
org
Menteri Lingkungan Hidup
p.157
unresolved
org
Ministry of Lingkungan Hidup dan Kehutanan
p.157
unresolved
org
Menteri
p.157 ×8
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.