                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 1/1 Schedule

LAPORAN POSISI KEUANGAN                                                                     INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                          OF FINANCIAL POSITION
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                           AS AT 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                              (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham)                                                              except for par value and share data)

                                              Catatan/         30 September              31 Desember/
                                               Notes               2024                 December 2023

ASET                                                                                                                                     ASSETS
ASET LANCAR                                                                                                                   CURRENT ASSETS
Kas dan setara kas                                4                    3,200,830                   3,311,232             Cash and cash equivalents
Kas dan deposito berjangka yang
  dibatasi penggunaannya -                                                                                                Restricted cash and time
  bagian lancar                                    5                        3,972                      4,054            deposits - current portion
Piutang usaha                                     7a                      477,836                    520,494                     Trade receivables
Investasi lain-lain -                                                                                                          Other investments -
  bagian lancar                                   6                        64,016                     48,271                       current portion
Persediaan                                        9                       224,929                    171,076                            Inventories
Pajak dibayar dimuka -                                                                                                              Prepaid taxes -
  bagian lancar                                  33a                          95,523                 103,641                       current portion
Pajak yang bisa dipulihkan                                                                                                     Recoverable taxes -
  kembali - bagian lancar                        33b                               -                   39,196                      current portion
                                                                                                                                Other receivables -
Piutang lain-lain - bagian lancar                 7b                          20,978                   21,457                      current portion
Pinjaman untuk pihak ketiga -                                                                                               Loans to third parties -
  bagian lancar                                   14                               -                   26,356                      current portion
Pinjaman untuk pihak berelasi -                                                                                           Loans to related parties -
  bagian lancar                                  34b                           2,151                          -                    current portion
Uang muka dan biaya dibayar                                                                                           Advances and prepayments -
  dimuka - bagian lancar                          8                           44,523                   47,671                      current portion
Aset lancar lain-lain                                                          2,271                    8,585                 Other current assets

Total aset lancar                                                      4,137,029                   4,302,033                    Total current assets

ASET TIDAK LANCAR                                                                                                         NON-CURRENT ASSETS
Kas dan deposito berjangka yang
  dibatasi penggunaannya -                                                                                               Restricted cash and time
  bagian tidak lancar                             5                           52,081                   52,252      deposits - non-current portion
Investasi lain-lain -                                                                                                          Other investments -
  bagian tidak lancar                             6                       508,348                    501,188                  non-current portion
Piutang lain-lain - bagian tidak                                                                                                Other receivables -
  lancar                                          7b                     123,140                     102,510                  non-current portion
Investasi pada ventura bersama                    11                   1,408,770                   1,363,594         Investments in joint ventures
Pinjaman untuk pihak ketiga -                                                                                               Loans to third parties -
     bagian tidak lancar                          14                      198,466                    170,733                  non-current portion
Pinjaman untuk pihak berelasi -                                                                                          Loans to related parties -
  bagian tidak lancar                            34b                      143,791                    143,637                  non-current portion
Uang muka dan biaya dibayar                                                                                          Advances and prepayments -
  dimuka - bagian tidak lancar                    8                       211,642                    171,460                  non-current portion
Pajak dibayar dimuka -                                                                                                              Prepaid taxes -
  bagian tidak lancar                            33a                      49,603                      15,721                  non-current portion
Properti pertambangan                            12                      950,946                     994,553                     Mining properties
Aset tetap                                        10                   2,218,823                   1,754,405                          Fixed assets
Goodwill                                         13                      776,943                     776,943                               Goodwill
Aset takberwujud                                                           3,869                       5,090                      Intangible assets
Piutang jasa konsesi                                                      33,342                      25,936       Service concession receivables
Aset pajak tangguhan                             33e                      86,982                      85,492                   Deferred tax assets
Aset tidak lancar lain-lain                                                5,412                       7,164             Other non-current assets

Total aset tidak lancar                                                6,772,158                   6,170,678              Total non-current assets

TOTAL ASET                                                            10,909,187                 10,472,711                           TOTAL ASSETS




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 5
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 1/2 Schedule

LAPORAN POSISI KEUANGAN                                                                     INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                          OF FINANCIAL POSITION
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                           AS AT 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                              (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham)                                                              except for par value and share data)

                                              Catatan/         30 September              31 Desember/
                                               Notes               2024                 December 2023

LIABILITAS DAN EKUITAS                                                                                                  LIABILITIES AND EQUITY

LIABILITAS                                                                                                                                 LIABILITIES

LIABILITAS JANGKA PENDEK                                                                                              CURRENT LIABILITIES
Utang usaha                                       15                      372,350                    344,743                    Trade payables
Utang dividen                                     27                            -                    429,510                Dividends payable
Beban yang masih harus dibayar                    17                      350,648                    257,975                Accrued expenses
Liabilitas imbalan kerja jangka                                                                                  Short-term employee benefits
  pendek                                                                       1,406                   1,978                        liabilities
Utang pajak:                                                                                                                    Taxes payable:
  - Pajak penghasilan badan                      33c                          49,476                  86,345 Corporate income tax payable -
  - Pajak lainnya                                33c                          26,227                  27,884           Other taxes payable -
Utang royalti                                    16                           33,653                  26,988                  Royalties payable
Bagian lancar atas pinjaman                                                                                       Current maturity of long-term
  jangka panjang:                                                                                                                 borrowings:
  - Liabilitas sewa                               18                       31,102                     28,794               Lease liabilities -
  - Utang bank                                    19                       96,687                    222,782                    Bank loans -
Senior Notes                                      20                      699,752                    697,189                       Senior Notes
Provisi pembongkaran, rehabilitasi,                                                                           Provision for decommissioning,
  reklamasi dan penutupan                                                                                    mine rehabilitation, reclamation
  tambang - bagian jangka pendek                  22                          3,704                    5,802    and closure - current portion
Utang lain-lain                                                               4,811                    5,244                     Other liabilities

Total liabilitas jangka pendek                                         1,669,816                   2,135,234                 Total current liabilities

LIABILITAS JANGKA PANJANG                                                                                            NON-CURRENT LIABILITIES
Pinjaman dari pihak ketiga                                                    13,967                    3,013             Loans from third parties
Pinjaman jangka panjang setelah
  dikurangi bagian yang akan                                                                                         Long-term borrowings, net of
  jatuh tempo dalam satu tahun:                                                                                                current maturities:
  - Liabilitas sewa                               18                       92,807                     83,117                   Lease liabilities -
  - Utang bank                                    19                      505,749                    404,361                        Bank loans -
Liabilitas pajak tangguhan                       33e                      150,550                    155,532                 Deferred tax liabilities
Liabilitas imbalan                                                                                                                Post-employment
  pasca kerja                                     21                          77,011                   73,938                   benefits liabilities
                                                                                                                   Provision for decommissioning,
Provisi pembongkaran, rehabilitasi,                                                                                           mine rehabilitation,
  reklamasi dan penutupan                                                                                             reclamation and closure -
  tambang - bagian jangka panjang                 22                     244,974                     208,766               non-current portion

Total liabilitas jangka panjang                                        1,085,058                     928,727          Total non-current liabilities

TOTAL LIABILITAS                                                       2,754,874                   3,063,961                     TOTAL LIABILITIES




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 6
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 1/3 Schedule

LAPORAN POSISI KEUANGAN                                                                  INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM PADA TANGGAL                                                                       OF FINANCIAL POSITION
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                        AS AT 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                           (Expressed in thousands of US Dollars,
kecuali nilai nominal dan data saham)                                                           except for par value and share data)

                                              Catatan/         30 September           31 Desember/
                                               Notes               2024              December 2023

LIABILITAS DAN EKUITAS                                                                                               LIABILITIES AND EQUITY

EKUITAS                                                                                                                                       EQUITY

Ekuitas yang diatribusikan                                                                                         Equity attributable to
  kepada pemilik entitas induk                                                                             owners of the parent entity
Modal saham - modal dasar                                                                                       Share capital - authorised
  80.000.000.000 lembar;                                                                                       80,000,000,000 shares;
  ditempatkan dan disetor penuh                                                                                    issued and fully paid
  30.758.665.900 lembar                                                                                         30,758,665,900 shares
  (31 Desember 2023:                                                                                               (31 December 2023:
  31.985.962.000 lembar) dengan                                                                              31,985,962,000 shares) at
  nilai nominal Rp100 per saham                   23                      329,256                 342,940 par value of Rp100 per share
Tambahan modal disetor, neto                      24                      991,159               1,154,494   Additional paid-in capital, net
Saham treasuri                                    23                            -                (158,308)                Treasury shares
                                                                                                                  Difference in value from
Selisih transaksi dengan                                                                                               transactions with
  pihak non-pengendali                            25                      157,815                 157,815      non-controlling interests
Saldo laba                                                                                                              Retained earnings
  - Dicadangkan                                   26                      68,588                   68,588                Appropriated -
  - Belum dicadangkan                             26                   5,934,884                5,151,562             Unappropriated -
Penghasilan komprehensif lain                                             48,439                   55,573   Other comprehensive income

Total ekuitas yang diatribusikan                                                                                   Total equity attributable to
  kepada pemilik entitas induk                                         7,530,141                6,772,664        owners of the parent entity

Kepentingan non-pengendali                        28                      624,172                 636,086             Non-controlling interests

TOTAL EKUITAS                                                          8,154,313                7,408,750                           TOTAL EQUITY

TOTAL LIABILITAS DAN                                                                                                  TOTAL LIABILITIES AND
 EKUITAS                                                              10,909,187              10,472,711                           EQUITY




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan     The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim    form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 7
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 2/1 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                                 INTERIM CONSOLIDATED STATEMENTS OF PROFIT
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM                                             OR LOSS AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                                  FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023                                                                30 SEPTEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS,                                                               (Expressed in thousands of US Dollars,
kecuali laba per saham dasar dan dilusian)                                               except for basic and diluted earnings per share)

                                              Catatan/                        30 September
                                               Notes                 2024                      2023

Pendapatan usaha                                   29                   4,451,677                  4,981,096                                    Revenue

Beban pokok pendapatan                             30                  (2,694,989)                (2,993,325)                         Cost of revenue

Laba bruto                                                              1,756,688                  1,987,771                               Gross profit

Beban usaha                                        31                    (255,068)                  (332,404)                 Operating expenses
Pendapatan/(beban) lain-lain, neto                 32                      17,881                    (36,708)        Other income/(expenses), net

Laba usaha                                                              1,519,501                  1,618,659                       Operating income

Biaya keuangan                                    38b                     (71,347)                    (81,429)                          Finance costs
Penghasilan keuangan                              38a                     122,068                      97,638                         Finance income
Bagian atas keuntungan neto                                                                                                       Share in net profit of
  ventura bersama                                  11                         56,074                   75,298                        joint ventures

                                                                          106,795                      91,507

Laba sebelum pajak penghasilan                                          1,626,296                  1,710,166              Profit before income tax

Beban pajak penghasilan                           33d                    (300,609)                  (332,332)                    Income tax expense

Laba periode berjalan                                                   1,325,687                  1,377,834                     Profit for the period

(Kerugian)/penghasilan                                                                                                  Other comprehensive
  komprehensif lain                                                                                                       (loss)/income for
  periode berjalan:                                                                                                               the period:
Pos-pos yang akan direklasifikasi                                                                                 Items that will be reclassified
  ke laba rugi:                                                                                                              to profit or loss:
                                                                                                                   Exchange difference due to
Selisih kurs karena penjabaran                                                                                          financial statements
  laporan keuangan                                                              301                    15,189                      translation
Bagian atas (kerugian)/penghasilan                                                                                                 Share of other
  komprehensif lain                                                                                                   comprehensive (loss)/
  dari ventura bersama                            11                          (7,472)                  31,768       income of joint ventures
Perubahan nilai wajar atas investasi                                                                                   Changes in fair value of
  pada instrumen utang pada nilai                                                                              investment in debt securities
  wajar melalui penghasilan                                                                                             at fair value through
  komprehensif lain                                6a                               -                    (106) other comprehensive income

                                                                              (7,171)                  46,851




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 8
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 2/2 Schedule

LAPORAN LABA RUGI DAN PENGHASILAN                                                 INTERIM CONSOLIDATED STATEMENTS OF PROFIT
KOMPREHENSIF LAIN KONSOLIDASIAN INTERIM                                             OR LOSS AND OTHER COMPREHENSIVE INCOME
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                                  FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023                                                                30 SEPTEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS,                                                               (Expressed in thousands of US Dollars,
kecuali laba per saham dasar dan dilusian)                                               except for basic and diluted earnings per share)

                                              Catatan/                        30 September
                                               Notes                 2024                      2023

(Kerugian)/penghasilan                                                                                            Other comprehensive (loss)/
  komprehensif lain                                                                                                   income for the period:
  periode berjalan: (lanjutan)                                                                                                      (continued)
Pos-pos yang tidak akan                                                                                        Items that will not be reclassified
  direklasifikasi ke laba rugi:                                                                                                to profit or loss:
Perubahan nilai wajar atas investasi                                                                                     Changes in fair value of
  pada funds pada nilai                                                                                                   investment in funds
  wajar melalui penghasilan                                                                                               at fair value through
  komprehensif lain                                6a                          (140)                   10,300 other comprehensive income
                                                                                                                               Remeasurement of
Pengukuran kembali liabilitas                                                                                       post-employment benefits
  imbalan pasca kerja                                                           542                          -                         liabilities
Pajak penghasilan terkait pos ini                 33d                          (112)                        -     Income tax relating to this item

                                                                                290                    10,300

                                                                              (6,881)                  57,151

Total penghasilan komprehensif                                                                                     Total comprehensive income
  periode berjalan, setelah pajak                                       1,318,806                  1,434,985        for the period, net of tax

Laba periode berjalan yang dapat                                                                                             Profit for the period
  diatribusikan kepada:                                                                                                        attributable to:
Pemilik entitas induk                                                   1,182,928                  1,218,898             Owners of the parent entity
Kepentingan non-pengendali                        28                      142,759                    158,936               Non-controlling interests

Laba periode berjalan                                                   1,325,687                  1,377,834                     Profit for the period

Total penghasilan komprehensif                                                                                              Total comprehensive
  periode berjalan yang dapat                                                                                            income for the period
  diatribusikan kepada:                                                                                                        attributable to:
Pemilik entitas induk                                                   1,176,188                  1,274,899             Owners of the parent entity
Kepentingan non-pengendali                        28                      142,618                    160,086               Non-controlling interests

Total penghasilan komprehensif                                                                                     Total comprehensive income
  periode berjalan, setelah pajak                                       1,318,806                  1,434,985        for the period, net of tax

Laba per saham                                                                                                                  Earnings per share
  diatribusikan kepada                                                                                                   attributable to owners
  pemilik entitas induk                           35                                                                         of the parent entity
  - Dasar (nilai penuh)                                                   0.03844                    0.03941                 Basic (full amount) -
  - Dilusian (nilai penuh)                                                0.03844                    0.03941               Diluted (full amount) -




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 9
                                                                                                          PT ADARO ENERGY INDONESIA Tbk
                                                                                                     DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                                                         Lampiran 3/1 Schedule

LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM                                                                                                                                      INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA TANGGAL                                                                                                                                                  FOR THE NINE-MONTH PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023                                                                                                                                                                                       30 SEPTEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS)                                                                                                                                                                          (Expressed in thousands of US Dollars)


                                                                        Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
                                                                                                                                                     Penghasilan komprehensif lain/
                                                                                                                                                       Other comprehensive income
                                                                                                                                                                                   Cadangan
                                                                                                                                                                               perubahan nilai
                                                                                                                                                                                   wajar aset
                                                                                                                                                                                keuangan pada
                                                                                                                                                                               nilai wajar melalui
                                                                                                                                                                   Bagian         penghasilan
                                                                                                                                                                penghasilan/   komprehensif lain/
                                                                                   Selisih transaksi                                                             (kerugian)       Reserve for
                                                                                     dengan pihak                                                              komprehensif     changes in fair
                                                    Tambahan                       non-pengendali/                                            Translasi           lain dari         value of
                                                      modal                            Difference                                               mata         ventura bersama/ financial assets
                                                   disetor, neto/    Saham           in value from    Saldo laba/Retained earnings          uang asing/        Share of other     at fair value                   Kepentingan
                                                    Additional      treasuri/      transactions with                        Belum              Foreign        comprehensive      through other                   non-pengendali/      Total
                                   Modal saham/       paid-in       Treasury        non-controlling   Dicadangkan/       dicadangkan/         currency         income/(loss)   comprehensive                     Non-controlling     ekuitas/
                                   Share capital    capital, net     shares             interests     Appropriated      Unappropriated       translation     of joint ventures       income          Total          interests      Total equity

Saldo pada 1 Januari 2023               342,940        1,154,494      (139,936)           153,614            68,588          4,412,865           (67,903)            88,971            10,967        6,024,600         502,738        6,527,338       Balance as at 1 January 2023

Total penghasilan komprehensif                                                                                                                                                                                                                          Total comprehensive income
   periode berjalan                           -                 -             -                 -                  -        1,218,898             15,064             31,768             9,169        1,274,899         160,086        1,434,985                   for the period

Pembelian saham treasuri                                                                                                                                                                                                                                Purchase of treasury shares
  (Catatan 23)                                -                 -     (18,372)                  -                  -                  -                 -                  -                 -        (18,372)                -        (18,372)                       (Note 23)

Penerbitan saham entitas anak                                                                                                                                                                                                                              Issuance of subsidiaries’
  kepada kepentingan                                                                                                                                                                                                                                   shares to non-controlling
  non-pengendali                              -                 -             -                 -                  -                  -                 -                  -                 -               -          48,404           48,404                       interests

Akuisisi kepentingan                                                                                                                                                                                                                                    Acquisition of non-controlling
   non-pengendali                             -                 -             -                  -                 -                  -                 -                  -                 -               -          (1,129)          (1,129)                          interest

Transaksi dengan pihak                                                                                                                                                                                                                              Transactions with non-controlling
   non-pengendali                             -                 -             -             1,159                  -                  -                 -                  -                 -          1,159                 -           1,159                        interests

Dividen (Catatan 27)                          -                 -             -                 -                  -         (500,000)                  -                  -                 -       (500,000)         (81,781)       (581,781)                 Dividends (Notes 27)

Saldo pada 30 September 2023            342,940        1,154,494      (158,308)           154,773            68,588          5,131,763           (52,839)           120,739            20,136        6,782,286         628,318        7,410,604    Balance as at 30 September 2023




                         Catatan atas laporan keuangan konsolidasian interim terlampir merupakan bagian yang                                                             The accompanying notes to the interim consolidated financial statements form an
                           tidak terpisahkan dari laporan keuangan konsolidasian interim secara keseluruhan.                                                                     integral part of these interim consolidated financial statements.
Page 10
                                                                                                          PT ADARO ENERGY INDONESIA Tbk
                                                                                                     DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                                                          Lampiran 3/2 Schedule

LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM                                                                                                                                       INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR PADA TANGGAL                                                                                                                                                   FOR THE NINE-MONTH PERIODS ENDED
30 SEPTEMBER 2024 DAN 2023                                                                                                                                                                                        30 SEPTEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS)                                                                                                                                                                           (Expressed in thousands of US Dollars)



                                                                         Diatribusikan kepada pemilik entitas induk/Attributable to owners of the parent entity
                                                                                                                                                      Penghasilan komprehensif lain/
                                                                                                                                                        Other comprehensive income
                                                                                                                                                                                    Cadangan
                                                                                                                                                                                perubahan nilai
                                                                                                                                                                                    wajar aset
                                                                                                                                                                                 keuangan pada
                                                                                                                                                                                nilai wajar melalui
                                                                                                                                                                    Bagian         penghasilan
                                                                                                                                                                 penghasilan/   komprehensif lain/
                                                                                    Selisih transaksi                                                             (kerugian)       Reserve for
                                                                                      dengan pihak                                                              komprehensif     changes in fair
                                                     Tambahan                       non-pengendali/                                            Translasi           lain dari         value of
                                                       modal                            Difference                                               mata         ventura bersama/ financial assets
                                                    disetor, neto/    Saham           in value from    Saldo laba/Retained earnings          uang asing/        Share of other     at fair value                   Kepentingan
                                                     Additional      treasuri/      transactions with                        Belum              Foreign        comprehensive      through other                   non-pengendali/      Total
                                    Modal saham/       paid-in       Treasury        non-controlling   Dicadangkan/       dicadangkan/         currency         income/(loss)   comprehensive                     Non-controlling     ekuitas/
                                    Share capital    capital, net     shares             interests     Appropriated      Unappropriated       translation     of joint ventures       income          Total          interests      Total equity

Saldo pada 1 Januari 2024                342,940        1,154,494      (158,308)           157,815            68,588          5,151,562           (49,085)            81,605            23,053        6,772,664         636,086        7,408,750          Balance as at 1 January 2024

Total penghasilan komprehensif                                                                                                                                                                                                                              Total comprehensive income
   periode berjalan                            -                 -             -                 -                  -        1,183,322                465             (7,472)             (127)       1,176,188         142,618        1,318,806                      for the period

Pembelian saham treasuri                                                                                                                                                                                                                                    Purchase of treasury shares
  (Catatan 23)                                 -                 -      (18,711)                 -                  -                  -                 -                  -                 -        (18,711)                -         (18,711)                         (Note 23)

Pengurangan modal ditempatkan                                                                                                                                                                                                                           Reduction of issued and paid-up
  dan disetor (Catatan 23 dan 24)        (13,684)       (163,335)       177,019                  -                  -                  -                 -                  -                 -               -                -                   -      capital (Notes 23 and 24)

Kehilangan pengendalian                        -                 -             -                 -                  -                  -                 -                  -                 -               -            (304)            (304)                        Loss of control

Dividen (Catatan 27)                           -                 -             -                 -                  -         (400,000)                  -                  -                 -       (400,000)        (154,228)        (554,228)                  Dividends (Notes 27)

Saldo pada 30 September 2024             329,256         991,159               -           157,815            68,588          5,934,884           (48,620)            74,133            22,926        7,530,141         624,172        8,154,313       Balance as at 30 September 2024




                       Catatan atas laporan keuangan konsolidasian interim terlampir merupakan bagian yang                                                                The accompanying notes to the interim consolidated financial statements form an
                         tidak terpisahkan dari laporan keuangan konsolidasian interim secara keseluruhan.                                                                        integral part of these interim consolidated financial statements.
Page 11
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 4/1 Schedule

LAPORAN ARUS KAS                                                                                               INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                    STATEMENTS OF CASH FLOWS
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                                        FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023                                                                   30 SEPTEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS)                                                                   (Expressed in thousands of US Dollars)

                                               Catatan/                 30 September
                                                Notes               2024           2023

Arus kas dari aktivitas operasi                                                                             Cash flows from operating activities
Penerimaan dari pelanggan                                            4,487,438              5,222,482                    Receipts from customers
Pembayaran kepada pemasok
  dan kontraktor                                                    (1,712,953)            (1,697,818) Payments to suppliers and contractors
Pembayaran biaya karyawan                                             (237,714)              (230,748)         Payments of employee costs
Penerimaan penghasilan bunga                                            99,995                 77,877            Receipts of finance income
Pembayaran royalti                                                    (852,986)            (1,204,345)                Payments of royalties
Pembayaran pajak penghasilan badan                                                                         Payments of corporate income tax
  dan pajak penghasilan final                                         (352,575)            (1,454,488)               and final income tax
Penerimaan pengembalian Pajak                                                                                  Receipts of Value Added Tax
  Pertambahan Nilai ("PPN")                                            201,198                142,308                      (“VAT”) refund
Pembayaran Penerimaan Negara                                                                            Payments of Non-Tax State Revenue
  Bukan Pajak (“PNBP”) dan                                                                             (“PNBP”) and regional government
  pendapatan pemerintah daerah                                          (32,123)                    -                             revenue
Penerimaan restitusi pajak penghasilan                                    6,930                   636        Receipts of income tax refunds
Pembayaran biaya keuangan                                               (68,385)              (63,641)            Payments of finance costs
Penerimaan lain-lain, neto                                                7,632                 6,576                     Other receipts, net

Arus kas bersih yang diperoleh dari                                                                                       Net cash flows provided
  aktivitas operasi                                                  1,546,457                798,839                  from operating activities

Arus kas dari aktivitas investasi                                                                           Cash flows from investing activities
Pembelian investasi lain-lain                                           (29,696)                 (8,941)           Purchase of other investments
Penerimaan hasil penjualan                                                                                                Proceeds from sales of
  investasi lain-lain                                                    11,561                 46,864                     other investments
Pembayaran atas
  penambahan aset tetap                                               (581,624)               (412,094)   Payments for addition of fixed assets
Penerimaan hasil penjualan aset tetap              10                    7,127                   2,513 Proceeds from disposal of fixed assets
Pembayaran atas penambahan                                                                                     Payments for addition of mining
  properti pertambangan                                                  (5,874)               (16,897)                           properties
Pembayaran atas penambahan aset                                                                             Payments for addition of intangible
  takberwujud                                                                 (531)             (1,582)                               assets
Arus kas keluar bersih dari akuisisi                                                                          Net cash outflow from acquisition
  entitas anak                                                             (156)                  (107)                      of subsidiaries
Pemberian pinjaman ke pihak ketiga                                      (19,030)               (11,998)             Loans given to third parties
Pemberian pinjaman ke pihak berelasi                                       (186)                (1,291)            Loan given to a related party
Penerimaan pembayaran kembali                                                                           Receipts from repayment of loans given
  pinjaman ke pihak ketiga                                                7,025                  7,862                       to a third party
Penempatan kas dan deposito
  berjangka yang dibatasi                                                                                          Placement of restricted cash and
  penggunaannya                                                         (16,522)               (19,918)                           time deposits
Penerimaan dari pencairan kas dan
  deposito berjangka yang dibatasi                                                                       Proceeds from withdrawal of restricted
  penggunaannya                                                          18,230                 12,800               cash and time deposits
Penerimaan dividen dari investasi                                                                         Dividends received from investments
  pada ventura bersama                                                   12,049                 18,525                      in joint ventures
Pembayaran atas penambahan                                                                                  Payments for additional investment
  investasi pada ventura bersama                                         (8,623)                (3,676)                     in joint ventures
Penerimaan pembayaran kembali                                                                           Receipts from repayment of loans given
  pinjaman ke pihak berelasi                                                     -               3,381                     to related parties
Pembelian Senior Notes                             20                            -              (7,030)               Purchase of Senior Notes

Arus kas bersih yang digunakan                                                                                                Net cash flows used in
  untuk aktivitas investasi                                           (606,250)               (391,589)                       investing activities



  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 12
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 4/2 Schedule

LAPORAN ARUS KAS                                                                                               INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                    STATEMENTS OF CASH FLOWS
UNTUK PERIODE SEMBILAN BULAN YANG BERAKHIR                                                        FOR THE NINE-MONTH PERIODS ENDED
PADA TANGGAL 30 SEPTEMBER 2024 DAN 2023                                                                   30 SEPTEMBER 2024 AND 2023
(Dinyatakan dalam ribuan Dolar AS)                                                                   (Expressed in thousands of US Dollars)

                                               Catatan/                 30 September
                                                Notes               2024           2023

Arus kas dari aktivitas pendanaan                                                                           Cash flows from financing activities
Penerimaan utang bank                                                  302,632                 205,734                   Proceeds from bank loans
Pembayaran utang bank                                                 (341,303)               (129,901)                 Repayments of bank loans
Pembayaran biaya transaksi                                                                                                  Payment of transaction
  atas utang bank                                                             (293)            (20,216)                      costs of bank loans
Penerimaan dari pinjaman                                                                                                        Proceeds from loan
  dari pihak ketiga                                                      10,659                         -                      from third parties
Pembayaran dividen kepada                                                                                                 Payments of dividends to
  pemegang saham Perusahaan                        27                 (800,000)            (1,000,000)             the Company’s shareholders
Pembayaran dividen kepada                                                                                                 Payments of dividends to
  kepentingan non-pengendali                                          (183,738)               (112,296)                 non-controlling interests
Pembayaran liabilitas sewa                         37                  (24,990)                (28,106)                Payments of lease liabilities
Pembayaran untuk pembelian                                                                                                 Payments for purchase
  saham treasuri                                   23                   (18,711)               (18,372)                       of treasury shares
Pembayaran pinjaman                                                                                                             Repayments of loan
  dari pihak ketiga                                                              -               (3,256)                        from third parties
Penerimaan setoran modal dari                                                                                     Proceeds of capital injection from
  kepentingan non-pengendali                                                     -              48,254                 non-controlling interests
Penerimaan dari kepentingan                                                                                          Proceeds from non-controlling
  non-pengendali atas akuisisi                                                                               interests on the acquisition of interest
  kepentingan pada entitas anak                                                  -                  121                            in subsidiaries

Arus kas bersih yang digunakan                                                                                                Net cash flows used in
  untuk aktivitas pendanaan                                         (1,055,744)            (1,058,038)                        financing activities

Penurunan bersih kas dan                                                                                                         Net decrease in
  setara kas                                                          (115,537)               (650,788)             cash and cash equivalents

Kas dan setara kas                                                                                                   Cash and cash equivalents at
  pada awal periode                                                  3,311,232              4,067,358               the beginning of the period

Efek perubahan nilai kurs pada                                                                                  Effect of exchange rate changes on
  kas dan setara kas                                                      5,135                   8,099              cash and cash equivalents

Kas dan setara kas pada                                                                                              Cash and cash equivalents at
  akhir periode                                                      3,200,830              3,424,669                    the end of the period


Lihat Catatan 37 untuk penyajian informasi arus kas Grup.                               Refer to Note 37 for presentation of the Group’s cash
                                                                                        flow information.




  Catatan atas laporan keuangan konsolidasian interim terlampir merupakan        The accompanying notes to the interim consolidated financial statements
  bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim       form an integral part of these interim consolidated financial statements.
                             secara keseluruhan.
Page 13
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/1 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

1.   UMUM                                                   1.   GENERAL

     a.   Pendirian    Perusahaan      dan    informasi          a.   Establishment of the Company and other
          lainnya                                                     information

          PT     Adaro     Energy      Indonesia    Tbk               PT Adaro Energy Indonesia Tbk (the
          (“Perusahaan”) didirikan berdasarkan Akta                   “Company”) was established by Notarial Deed
          Notaris Sukawaty Sumadi, S.H., Notaris di                   No. 25 dated 28 July 2004 of Sukawaty
          Jakarta, No. 25, tertanggal 28 Juli 2004. Akta              Sumadi, S.H., Notary in Jakarta. The Deed
          pendirian Perusahaan diumumkan dalam                        was published in the State Gazette of the
          Berita Negara Republik Indonesia No. 59,                    Republic of Indonesia No. 59, dated 25 July
          tertanggal 25 Juli 2006, Tambahan Berita                    2006, State Gazette Supplement No. 8036
          Negara No. 8036 dan disetujui oleh Menteri                  and was approved by the Minister of Justice of
          Kehakiman Republik Indonesia dengan Surat                   the Republic of Indonesia in Decree
          Keputusan No. C-21493 HT.01.01.TH.2004,                     No. C-21493 HT.01.01.TH.2004, dated
          tertanggal 26 Agustus 2004. Anggaran Dasar                  26 August 2004. The Articles of Association of
          Perusahaan telah diubah beberapa kali                       the Company have been amended several
          dengan perubahan terakhir berdasarkan Akta                  times, with the most recent change by Deed
          No. 10 tertanggal 4 Juni 2024 yang dibuat di                No. 06 dated 4 June 2024 made before
          hadapan Humberg Lie, S.H., M.Kn., Notaris di                Humberg Lie, S.H., M.Kn., Notary in North
          Jakarta     Utara,    sehubungan       dengan               Jakarta, in connection with the reduction of
          pengurangan modal ditempatkan dan disetor                   issued and fully paid capital in the Company
          penuh      dalam      Perusahaan      menjadi               to Rp3,075,866,590,000 (full amount). This
          Rp3.075.866.590.000         (nilai     penuh).              amendment to the Articles of Association was
          Perubahan Anggaran Dasar ini berlaku efektif                effective since the Company obtained
          sejak Perusahaan mendapatkan persetujuan                    approval from the Minister of Law and Human
          dari Menteri Hukum dan Hak Asasi Manusia                    Rights of the Republic of Indonesia pursuant
          Republik Indonesia berdasarkan surat                        to         Decree           No.         AHU-
          keputusan No. AHU-0043080.AH.01.02.TAHUN                    0043080.AH.01.02.TAHUN          2024    dated
          2024 tertanggal 17 Juli 2024.                               17 July 2024.

          Pada bulan Juli 2008, Perusahaan melakukan                  In July 2008, the Company conducted an
          Penawaran Umum Saham Perdana sebanyak                       Initial  Public    Offering    (“IPO”)    of
          11.139.331.000 lembar saham (34,8% dari                     11,139,331,000     shares     (34.8%       of
          31.985.962.000     modal     saham      yang                31,985,962,000 shares issued and fully paid
          ditempatkan dan disetor penuh). Penawaran                   up). The shares offered to the public in the
          kepada masyarakat tersebut dicatat di Bursa                 IPO were listed on the Indonesia Stock
          Efek Indonesia pada tanggal 16 Juli 2008.                   Exchange on 16 July 2008.

          Sesuai dengan Pasal 3 Anggaran Dasar                        In accordance with Article 3 of the Company’s
          Perusahaan, Maksud dan Tujuan Perusahaan                    Articles of Association, the Purpose and
          adalah menjalankan usaha dalam bidang                       Objectives of the Company are conducting
          aktivitas kantor pusat dan konsultasi                       business in the field of head office and
          manajemen (untuk kegiatan usaha entitas                     management consulting activities (for the
          anak Perusahaan yang bergerak dalam                         Company’s subsidiaries’ business activities
          bidang pertambangan, penggalian, jasa                       which include mining, quarrying, mining
          penunjang      pertambangan,    perdagangan                 support services, trading, transportation,
          besar, angkutan, pergudangan dan aktivitas                  warehousing and transportation support
          penunjang angkutan, penanganan kargo                        services, cargo handling (stevedoring), sea
          (bongkar muat barang), aktivitas pelayanan                  port     service     activities,    agriculture,
          kepelabuhanan laut, pertanian tanaman,                      construction, repair and installation of
          konstruksi, reparasi dan pemasangan mesin,                  machines, power supply, water treatment,
          pengadaan listrik, pengelolaan air, kehutanan               forestry and industry).
          dan industri).

          Perusahaan       mulai    beroperasi     secara             The Company commenced its commercial
          komersial pada bulan Juli 2005. Perusahaan                  operations in July 2005. The Company’s head
          berdomisili di Jakarta dan berlokasi di Gedung              office is in Jakarta and is located at the
          Menara Karya, lantai 23, Jl. H.R. Rasuna Said               Menara Karya Building, 23rd floor, Jl. H.R.
          Blok X-5, Kav. 1-2, Jakarta Selatan.                        Rasuna Said Block X-5, Kav. 1-2, South
                                                                      Jakarta.
Page 14
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/2 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                           30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

1.   UMUM (lanjutan)                                      1.    GENERAL (continued)

     a.   Pendirian Perusahaan        dan    informasi          a.   Establishment of the Company and other
          lainnya (lanjutan)                                         information (continued)

           PT Adaro Strategic Investments (“ASI”)                    PT Adaro Strategic Investments (“ASI”)
           bersama dengan Bapak Garibaldi Thohir,                    together with Garibaldi Thohir is the
           merupakan Pengendali dari Perusahaan                      Company’s Controller as stipulated in Article 1
           sebagaimana dimaksud dalam Pasal 1 angka                  number 4 letter a of the OJK Regulation No.
           4 huruf a Peraturan Otoritas Jasa Keuangan                9/POJK.04/2018 concerning the acquisition of
           No.         9/POJK.04/2018          tentang               a Publicly Traded Companies, as ASI and
           Pengambilalihan     Perusahaan     Terbuka,               Garibaldi Thohir collectively own 52.089% of
           karena ASI dan Bapak Garibaldi Thohir                     shares in the Company’s.
           secara bersama-sama memiliki 52,089%
           saham pada Perusahaan.

           Lebih lanjut, Pemilik Manfaat Perusahaan                  Furthermore, the Company’s Beneficial
           adalah Bapak Garibaldi Thohir, Bapak                      Owners are Garibaldi Thohir, Christian Ariano
           Christian Ariano Rachmat, Bapak Crescento                 Rachmat, Crescento Hermawan, and Michael
           Hermawan, dan Bapak Michael W.P.                          W.P. Soeryadjaya, collectively act in their
           Soeryadjaya, secara kolektif bertindak dalam              capacity as a member of the Board of
           kapasitasnya sebagai anggota Direksi ASI,                 Directors of ASI which own 45.663% of shares
           yang merupakan pemilik 45,663% saham                      in the Company’s, together with Garibaldi
           pada Perusahaan, bersama dengan Bapak                     Thohir, in his capacity as an individual who
           Garibaldi Thohir, dalam kapasitasnya sebagai              directly owns 6.426% of the shares in the
           individu pemegang 6,426% saham secara                     Company’s resulting those parties collectively
           langsung pada Perusahaan, sehingga secara                 own a total of 52.089% of shares in the
           bersama-sama pihak-pihak tersebut memiliki                Company’s, because to the extent that those
           sejumlah 52,089% saham pada Perusahaan,                   parties are acting jointly and the decision
           karena sepanjang pihak-pihak tersebut                     making is implemented through the
           bertindak    secara    bersama-sama      dan              Company’s General Meeting of Shareholders,
           pengambilan keputusan dilaksanakan melalui                those parties have the authority or power to
           Rapat Umum Pemegang Saham Perusahaan,                     influence or control the Company without
           pihak-pihak tersebut memiliki kewenangan                  having to obtain authorisation from any
           atau kekuasaan untuk mempengaruhi atau                    parties, as stipulated in Article 4 paragraph (1)
           mengendalikan Perusahaan tanpa harus                      letter e of the Presidential Regulation No. 13
           mendapat otorisasi dari pihak manapun,                    of 2018 on Implementation Of Know-Your-
           sebagaimana diatur dalam Pasal 4 ayat (1)                 Beneficial-Owner Principle by Corporations for
           huruf e Peraturan Presiden No. 13/2018                    the Purpose of Prevention and Eradication of
           tentang Penerapan Prinsip Mengenali Pemilik               Money Laundering and Terrorism Financing.
           Manfaat Dari Korporasi Dalam Rangka
           Pencegahan dan Pemberantasan Tindak
           Pidana Pencucian Uang dan Tindak Pidana
           Pendanaan Terorisme.

           Berdasarkan Akta No. 8 tertanggal 4 Juni                   Based on Deed No. 8 dated 4 June 2024
           2024 yang dibuat dihadapan Humberg Lie,                    made before Humberg Lie, S.H., S.E., M.Kn.,
           S.H., S.E., M.Kn., Notaris di Jakarta Utara,               Notary in North Jakarta, the composition of the
           susunan anggota Direksi dan Dewan                          Company’s Boards of Commissioners and
           Komisaris    Perusahaan     pada     tanggal               Directors as at 30 September 2024 was as
           30 September 2024 adalah sebagai berikut:                  follows:

           Presiden Komisaris           :     Edwin Soeryadjaya               :            President Commissioner
           Wakil Presiden Komisaris     :     Theodore Permadi Rachmat        :       Vice President Commissioner
           Komisaris                    :     Arini Saraswaty Subianto        :                      Commissioner
           Komisaris Independen         :     Mohammad Effendi                :        Independent Commissioners
                                              Budi Bowoleksono

           Presiden Direktur            :     Garibaldi Thohir               :                    President Director
           Wakil Presiden Direktur      :     Christian Ariano Rachmat       :               Vice President Director
           Direktur                     :     Julius Aslan                   :                            Directors
                                              Iwan Dewono Budiyuwono
                                              M. Syah Indra Aman
                                              Michael William P. Soeryadjaya
Page 15
                                                 PT ADARO ENERGY INDONESIA Tbk
                                            DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                   Lampiran 5/3 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                           30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                 unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.          GENERAL (continued)
     a.   Pendirian Perusahaan dan informasi                                                    a.   Establishment of the Company and other
          lainnya (lanjutan)                                                                         information (continued)
          Berdasarkan Akta No. 44 tertanggal 22 Mei                                                  Based on Deed No. 44 dated 22 May 2023
          2023 yang dibuat dihadapan Humberg Lie,                                                    made before Humberg Lie, S.H., S.E., M.Kn.,
          S.H., S.E., M.Kn., Notaris di Jakarta Utara dan                                            Notary in North Jakarta and Deed No. 15 dated
          Akta No. 15 tertanggal 15 Februari 2022, yang                                              15 February 2022, made before Mahendra
          dibuat di hadapan Mahendra Adinegara, S.H.,                                                Adinegara, S.H., M.Kn., Notary in South
          M.Kn., Notaris di Jakarta Selatan, susunan                                                 Jakarta, the composition of the Company’s
          anggota Direksi dan Dewan Komisaris                                                        Boards of Commissioners and Directors as at
          Perusahaan pada tanggal 31 Desember 2023                                                   31 December 2023 was as follows:
          adalah sebagai berikut:
          Presiden Komisaris                               :         Edwin Soeryadjaya                         :               President Commissioner
          Wakil Presiden Komisaris                         :         Theodore Permadi Rachmat                  :          Vice President Commissioner
          Komisaris                                        :         Arini Saraswaty Subianto                  :                         Commissioner
          Komisaris Independen                             :         Mohammad Effendi                          :           Independent Commissioners
                                                                     Budi Bowoleksono
          Presiden Direktur                                :         Garibaldi Thohir               :                                   President Director
          Wakil Presiden Direktur                          :         Christian Ariano Rachmat       :                              Vice President Director
          Direktur                                         :         Julius Aslan                   :                                           Directors
                                                                     Chia Ah Hoo
                                                                     M. Syah Indra Aman
                                                                     Michael William P. Soeryadjaya
          Susunan Komite Audit Perusahaan pada                                                       The composition of the Company’s Audit
          tanggal 30 September 2024 dan 31 Desember                                                  Committee as at 30 September 2024 and
          2023 adalah sebagai berikut:                                                               31 December 2023 was as follows:
          Ketua                                            :        Mohammad Effendi                           :                                    Chairman
          Anggota                                          :        Ignatius Robby Sani                        :                                    Members
                                                                    Lindawati Gani
          Pada tanggal 30 September 2024, Perusahaan                                                 As at 30 September 2024, the Company and
          dan entitas anaknya (“Grup”) memiliki 13.042                                               its subsidiaries (“Group”) had 13,042
          karyawan tetap (31 Desember 2023: 13.983                                                   permanent employees (31 December 2023:
          karyawan tetap) (tidak diaudit).                                                           13,983 permanent employees) (unaudited).

     b.   Struktur grup                                                                         b.   Group structure
          Pada tanggal 30 September 2024 dan                                                         As at 30 September 2024 and 31 December
          31 Desember 2023, struktur Grup adalah                                                     2023, the structure of the Group was as
          sebagai berikut:                                                                           follows:
                                                                                  Mulai beroperasi
                                          Kegiatan                                   komersial/              Persentase                      Total aset
                                           usaha/                                 Commencement           kepemilikan efektif/          (sebelum eliminasi)/
                                          Business             Kedudukan/          of commercial       Effective percentage of              Total assets
                                           activity             Domicile             operations               ownership                 (before elimination)
                                                                                                                     31 Desember/                   31 Desember/
                                                                                                     30 September     December    30 September       December
                                                                                                         2024            2023         2024              2023

          Entitas anak melalui kepemilikan langsung/Directly owned subsidiaries

          PT Adaro Andalan             Perdagangan              Indonesia                2007               100%           100%       5,908,074         6,740,632
             Indonesia (“AAI”) a) b)     dan jasa/
                                         Trading and
                                         services

          PT Saptaindra                Jasa                     Indonesia                2002               100%           100%         918,203           853,185
             Sejati (“SIS”)              pertambangan/
                                         Mining services

          PT Alam Tri Bangun           Investasi/               Indonesia                 -                 100%           100%         198,239           204,757
             Indonesia (“ATBI”)           Investment

          PT Adaro Minerals            Jasa                     Indonesia                2016                84%            84%       1,841,729         1,695,420
             Indonesia Tbk               pertambangan/
             (“AMI”) a)                  Mining services

          PT Adaro Clean Energy        Investasi/               Indonesia                  -                100%           100%         118,366            93,930
             Indonesia (“ACEI”) a)        Investment

          a) dan entitas anaknya/and its subsidiaries
          b) dahulu bernama PT Alam Tri Abadi/formerly named PT Alam Tri Abadi
Page 16
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                 Lampiran 5/4 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.           GENERAL (continued)
     b.   Struktur grup (lanjutan)                                                               b. Group structure (continued)
                                                                                 Mulai beroperasi
                                         Kegiatan                                   komersial/                 Persentase                      Total aset
                                          usaha/                                 Commencement              kepemilikan efektif/          (sebelum eliminasi)/
                                         Business          Kedudukan/             of commercial          Effective percentage of              Total assets
                                          activity          Domicile                operations                  ownership                 (before elimination)
                                                                                                                       31 Desember/                   31 Desember/
                                                                                                       30 September     December    30 September       December
                                                                                                           2024            2023         2024              2023

          Entitas anak melalui kepemilikan langsung/Directly owned subsidiaries (lanjutan/continued)

          PT Adaro Power             Investasi/              Indonesia                     -                  100%           100%         885,022         1,218,806
             (“AP”) a)                  Investment

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries

          PT Adaro Indonesia         Pertambangan/           Indonesia                    1992                 88%            88%       2,650,315         3,142,514
             (“AI”)                    Mining

          PT Dianlia                 Investasi/              Indonesia                     -                  100%           100%          44,130            78,518
             Setyamukti                Investment
             (“Dianlia”)

          PT Biscayne                Investasi/              Indonesia                     -                       -         100%                -               98
             Investments               Investment
             (“Biscayne”) c)

          PT Alam Tri Cakra          Investasi/              Indonesia                      -                  85%           100%          44,859            32,177
             Indonesia (“ATCI”)         Investment

          PT Indonesia Bulk          Jasa pengelolaan        Indonesia                    1997                100%           100%          52,541            62,653
             Terminal (“IBT”)          terminal/
                                       Terminal
                                       handling service

          PT Adaro Persada           Jasa/Services           Indonesia                    2006                100%           100%          93,486            81,489
             Mandiri (“APM”) a)

          Arindo Holdings            Investasi/               Mauritius                    -                   90%            90%       1,943,079         1,929,833
              (Mauritius) Ltd          Investment
              (“Arindo
              Holdings”) a)

          Vindoor                    Investasi/               Mauritius                    -                   90%            90%       1,369,703         1,390,052
             Investments               Investment
             (Mauritius) Ltd
             (“Vindoor”) a)

          Adaro International        Perdagangan             Singapura/                   2001                 90%            90%         878,550           909,977
            (Singapore)                batubara/                Singapore
            Pte Ltd                    Coal trading
            (“AIS”)

          PT Viscaya                 Investasi/              Indonesia                     -                  100%           100%         266,884           460,386
             Investments               Investment
             (“Viscaya”)

          PT Sarana Daya             Jasa/Services           Indonesia                    2009                 30%            30%          22,734            14,069
             Mandiri (“SDM”)

          Orchard Maritime           Penanganan dan          Singapura/                   2006                100%           100%             269               271
             Logistics Pte             pengangkutan             Singapore
             Ltd (“OML”)               batubara/Coal
                                       handling and
                                       barging

          PT Adaro Logistics         Jasa/Services           Indonesia                    2015                100%           100%         642,420           680,348
             (“AL”)

          PT Maritim Barito          Pengangkutan            Indonesia                    2005                100%           100%         465,157           505,229
             Perkasa                   laut/Sea
             (“MBP”)                   transportation

          PT Harapan                 Pengangkutan            Indonesia                    2004                100%           100%          21,383            23,454
             Bahtera                   laut/Sea
             Internusa                 transportation
             (“HBI”)

          PT Makmur                  Perdagangan dan         Indonesia                    2013                100%           100%         131,680           137,819
             Sejahtera                 pembangkitan
             Wisesa                    listrik/Trading
             (“MSW”)                   and power
                                       plant services

          PT Puradika Bongkar        Jasa/Services           Indonesia                    2013                100%           100%           9,605            10,943
             Muat Makmur
             (“PBMM”)

          PT Rehabilitasi            Jasa/Services           Indonesia                    2016                100%           100%          18,366            14,556
             Lingkungan
             Indonesia (“RLI”) a)

          a) dan entitas anaknya/and its subsidiaries
          c) telah dilikuidasi/has been liquidated
Page 17
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                 Lampiran 5/5 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.          GENERAL (continued)
     b.   Struktur grup (lanjutan)                                                              b.       Group structure (continued)
                                                                                 Mulai beroperasi
                                         Kegiatan                                   komersial/                   Persentase                      Total aset
                                          usaha/                                 Commencement                kepemilikan efektif/          (sebelum eliminasi)/
                                         Business           Kedudukan/            of commercial            Effective percentage of              Total assets
                                          activity           Domicile               operations                    ownership                 (before elimination)
                                                                                                                         31 Desember/                   31 Desember/
                                                                                                         30 September     December    30 September       December
                                                                                                             2024            2023         2024              2023

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)

          PT Indonesia Multi         Jasa pengelolaan         Indonesia                  2013                   100%           100%          12,814            10,859
             Purpose                   terminal/
             Terminal (“IMPT”)         Terminal
                                       handling service

          PT Mustika Indah           Pertambangan/            Indonesia                  2019                    75%            75%         194,384           205,837
             Permai (“MIP”)            Mining

          PT Bukit Enim              Pertambangan/            Indonesia                   -                          -          61%                -            1,377
             Energi (“BEE”) d)         Mining

          PT Adaro Mining            Jasa/Services            Indonesia                  2023                   100%           100%          61,010            93,448
             Technologies
             (“AMT”) a)

          PT Adaro Jasabara          Jasa/Services            Indonesia                  2007                   100%           100%           8,097             6,634
             Indonesia
             (“AJI”)

          PT Adaro Tirta             Perdagangan/             Indonesia                  2019                   100%           100%         113,618            93,952
             Mandiri (“ATM”) a)        Trading

          PT Agri Multi Lestari      Peternakan/              Indonesia                  2016                   100%           100%           5,458             5,588
             (“AML”)                   Farming

          PT Paramitha Cipta         Pertambangan/            Indonesia                  2024                    75%            75%          74,529            59,173
             Sarana (“PCS”)            Mining

          PT Semesta                 Pertambangan/            Indonesia                  2014                    75%            75%         136,629           193,542
             Centramas (“SCM”)         Mining

          PT Laskar Semesta          Pertambangan/            Indonesia                  2016                    75%            75%         142,694           244,814
             Alam (“LSA”)              Mining

          PT Adaro Tirta             Jasa penunjang           Indonesia                  2021                   100%           100%          53,015            43,105
             Sarana (“ATS”) a)         pertambangan/
                                       Mining support
                                       service

          PT Drupadi Tirta           Pengolahan air/          Indonesia                  2016                   100%           100%           8,499             8,329
             Intan (“DTI”)             Water treatment

          PT Adaro Tirta              Pengolahan air/         Indonesia                  2016                   100%           100%          11,879            11,061
             Gresik (“ATG”)             Water treatment

          PT Lahai Coal (“LC”)       Pertambangan/            Indonesia                  2016                    84%            84%         107,821           107,051
                                       Mining

          PT Pari Coal (“PC”)        Pertambangan/            Indonesia                   -                      65%            65%          21,264             8,877
                                       Mining

          PT Juloi Coal (“JC”)       Pertambangan/            Indonesia                   -                      84%            84%          27,725            28,451
                                       Mining

          PT Sumber Barito           Pertambangan/            Indonesia                   -                      84%            84%           2,225             2,512
             Coal (“SBC”)              Mining

          PT Kalteng Coal (“KC”)     Pertambangan/            Indonesia                   -                      84%            84%           2,190             2,439
                                       Mining

          PT Maruwai Coal (“MC”)     Pertambangan/            Indonesia                  2020                    84%            84%       1,168,357         1,185,897
                                       Mining

          PT Ratah Coal (“RC”)       Pertambangan/            Indonesia                   -                     100%           100%             169               360
                                       Mining
          PT Batuan Anugerah         Pertambangan/            Indonesia                   -                      84%            84%           1,948               108
             Semesta (“BAS”) e)        Mining
          Adaro Capital              Investasi/               Malaysia                   2017                    90%            90%         880,969           847,938
            Limited (“ACL”)             Investment
          PT Alam Sukses Lestari     Kehutanan/               Indonesia                  2018                   100%           100%           2,895             2,669
             (“ASL”)                   Forestry
          PT Barito Galangan         Pembuatan,               Indonesia                  2018                   100%           100%          21,119            16,854
             Nusantara (“BGN”)         perbaikan dan
                                       perawatan
                                       angkutan laut/
                                       Manufacture,
                                       repair and
                                       maintenance of
                                       sea transportation

          a) dan entitas anaknya/and its subsidiaries
          d) pada tanggal 8 Agustus 2024, AAI telah melepas seluruh kepemilikan sahamnya pada BEE/on 8 August 2024, AAI has divested all of its shares ownership in BEE
Page 18
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                  Lampiran 5/6 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.          GENERAL (continued)
     b.   Struktur grup (lanjutan)                                                              b.       Group structure (continued)
                                                                                 Mulai beroperasi
                                         Kegiatan                                   komersial/                   Persentase                      Total aset
                                          usaha/                                 Commencement                kepemilikan efektif/          (sebelum eliminasi)/
                                         Business             Kedudukan/          of commercial            Effective percentage of              Total assets
                                          activity             Domicile             operations                    ownership                 (before elimination)
                                                                                                                         31 Desember/                   31 Desember/
                                                                                                         30 September     December    30 September       December
                                                                                                             2024            2023         2024              2023

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)

          PT Hutan Amanah            Kehutanan/                Indonesia                 2018                    75%            75%           1,445             1,417
             Lestari (“HAL”)           Forestry

          PT Adaro Tirta             Pengolahan air/           Indonesia                 2021                    90%            90%           8,012             7,086
             Mentaya (“ATME”)          Water treatment

          PT Adaro Wamco             Jasa penunjang            Indonesia                 2019                    60%            60%          14,520            12,638
             Prima (“AWP”)             pertambangan/
                                       Mining support
                                       services

          Adaro Australia Pty Ltd     Investasi/               Australia                  -                      90%            90%             700               452
                                         Investment

          PT Alam Tri Daya           Investasi/                Indonesia                  -                      84%            84%       1,298,610         1,301,915
             Indonesia (“ATDI”) a)      Investment

          PT Sarana Mekar             Investasi/               Indonesia                  -                      55%            55%          22,764            14,168
             Pratama (“SMP”) a)          Investment

          PT Adaro Indo              Investasi/                Indonesia                  -                      84%            84%         430,713           303,491
             Aluminium (“AIA”) a)       Investment

          PT Sarana Multi            Jasa/Services             Indonesia                  -                     100%           100%           5,169             3,560
             Talenta (“SMT”)

          PT Batam Surya              Investasi/               Indonesia                  -                      65%            65%          32,721             7,577
             Energi (“BSE”) a)           Investment

          PT Batam Sarana            Penyediaan tenaga         Indonesia                  -                      65%            65%          32,698             7,550
             Surya (“BSS”)             listrik/Electric
                                       power supply

          PT Karimun Sarana          Penyediaan tenaga         Indonesia                  -                      90%            90%           3,688             3,146
             Surya (“KSS”)             listrik/Electric
                                       power supply

          PT Persada Wana            Kehutanan/                Indonesia                  -                     100%           100%              16                17
             Lestari (“PWL”)           Forestry

          PT Cakra Wana              Kehutanan/                Indonesia                  -                     100%           100%             335               323
             Lestari (“CWL”)           Forestry

          PT Mandiri Wana            Kehutanan/                Indonesia                  -                     100%           100%              17                17
             Lestari (“MWL”)           Forestry

          PT Adaro Tirta             Jasa penunjang            Indonesia                 2023                   100%           100%           4,809             2,630
             Wening (“ATW”)            pengelolaan air/
                                       Water treatment
                                       support service

          PT Kalimantan              Pengolahan logam/         Indonesia                  -                      54%            54%         427,207           294,975
             Aluminium                 Metal
             Industry (“KAI”)          processing

          PT Kaltara Power           Penyediaan tenaga         Indonesia                  -                      84%            84%         360,986           322,367
             Indonesia (“KPI”)         listrik/Electric
                                       power supply

          Adaro Solar                 Transmisi, distribusi   Singapura/                  -                     100%           100%             208               149
            International Pte Ltd       dan penjualan          Singapore
            (“ASIN”)                    tenaga listrik/
                                        Transmission,
                                        distribution and
                                        sale of electricity

          PT Adaro Tirta              Pengolahan air/          Indonesia                  -                     100%           100%          10,196             5,722
             Brayan (“ATB”)             Water treatment

          PT Kalimantan Energi       Investasi/                Indonesia                  -                     100%           100%          74,508            72,026
             Hijau (“KEH”) a)           Investment

          PT Pembangkit              Penyedia tenaga           Indonesia                  -                     100%           100%               5                    7
             Indonesia                 listrik/Electric
             Alfa (“PIA”)              power supply

          PT Pembangkit              Penyedia tenaga           Indonesia                  -                     100%           100%               1                    3
             Indonesia                 listrik/Electric
             Gamma (“PIG”)             power supply

          a) dan entitas anaknya/and its subsidiaries
          e) dahulu bernama PT Balangan Anugerah Semesta/formerly named PT Balangan Anugerah Semesta
Page 19
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                 Lampiran 5/7 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

1.   UMUM (lanjutan)                                                                1.          GENERAL (continued)

     b.   Struktur grup (lanjutan)                                                              b.       Group structure (continued)
                                                                                 Mulai beroperasi
                                         Kegiatan                                   komersial/                   Persentase                      Total aset
                                          usaha/                                 Commencement                kepemilikan efektif/          (sebelum eliminasi)/
                                         Business            Kedudukan/           of commercial            Effective percentage of              Total assets
                                          activity            Domicile              operations                    ownership                 (before elimination)
                                                                                                                         31 Desember/                   31 Desember/
                                                                                                         30 September     December    30 September       December
                                                                                                             2024            2023         2024              2023

          Entitas anak melalui kepemilikan tidak langsung/Indirectly owned subsidiaries (lanjutan/continued)

          PT Pembangkit              Penyedia tenaga          Indonesia                   -                     100%           100%              94                94
             Indonesia                 listrik/Electric
             Delta (“PID”)             power supply

          PT Pembangkit              Penyedia tenaga          Indonesia                   -                     100%           100%             958               995
             Indonesia Eta             listrik/Electric
             (“PIEta”)                 power supply

          PT Pembangkit              Penyedia tenaga          Indonesia                   -                     100%           100%           2,821             2,972
             Indonesia                 listrik/Electric
             Epsilon (“PIEps”)         power supply

          PT Pembangkit              Penyedia tenaga          Indonesia                   -                     100%           100%               1                    5
             Indonesia                 listrik/Electric
             Zeta (“PIZ”)              power supply

          PT Mentarang Tirta         Investasi/               Indonesia                   -                     100%           100%          68,708            59,402
             Energi (“MTE”)             Investment

          PT Adaro Baterai            Investasi/              Indonesia                   -                      84%            84%         436,249           308,839
             Indonesia (“ABI”) a)        Investment

          PT Karimun Industri        Investasi/               Indonesia                   -                      90%            90%           3,701             3,159
             Surya Semesta              Investment
             (“KISS”) a)

          PT Adaro Sarana Energi     Penyedia tenaga          Indonesia                   -                     100%           100%             270               145
             Terbarukan (“ASET”)       listrik/Electric
                                       power supply

          PT Indoprima Niaga         Investasi/               Indonesia                   -                      65%            65%          34,002            12,827
             Sejahtera (“INS”) a)       Investment

          PT Indotama Semesta        Jasa pertambangan/       Indonesia                   -                      65%            65%          18,332            10,932
             Manunggal                 Mining services
              (“INDOTAMA”)

          PT Indovisi Sentosa        Kepelabuhan/             Indonesia                   -                      65%            65%           5,096             1,832
             Mandiri (“ISM”)           Port

          PT Mitra Rimba             Usaha kehutanan/         Indonesia                   -                      65%            65%             165               149
             Indoprima (“MRI”)         Forestry business

          PT Indo Mitra              Jasa pertambangan/       Indonesia                   -                      65%            65%             136               149
             Konstruksi (“IMK”)        Mining services

          PT Adaro Wind               Investasi/              Indonesia                   -                     100%           100%             484               285
             Energy (“AWE”)              Investment

          PT Jaringan Interkoneksi   Transmisi tenaga         Indonesia                   -                     100%           100%           1,199                12
             Karimun Abadi             listrik/Electricity
             (“JIKA”)                  transmission

          PT Jaringan Interkoneksi   Transmisi tenaga         Indonesia                   -                     100%           100%              12                12
             Batam Abadi               listrik/Electricity
             (“JIBA”)                  transmission

          PT Koridor Anugerah         Investasi/              Indonesia                   -                     100%                -           297                    -
             Mentari Indonesia           Investment
             (“KAMI”) f)

          PT Harapan Insani          Kawasan industri/        Indonesia                   -                     100%                -         9,490                    -
             Millenia (“HIM”) g)       Industrial estate

          PT Basalt Sinar Lestari     Penggalian batu,        Indonesia                   -                      84%                -             7                    -
             (“BASL”) f)               pasir dan tanah
                                       liat lainnya/Stone,
                                       sand and other
                                       clays quarrying

          PT Bumi Alam Seraya        Pertambangan batu        Indonesia                  2024                    84%                -         1,527                    -
             (“BASR”) g)               kapur/Limestone
                                       mining

          PT Adaro Jasa Tirta        Jasa penunjang           Indonesia                   -                     100%                -         6,891                    -
             (“AJT”) f)                pengelolaan air/
                                       Water treatment
                                       support service

          a) dan entitas anaknya/and its subsidiaries
          f) didirikan pada tahun 2024/established in 2024
          g) diakusisi pada tahun 2024/acquired in 2024
Page 20
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/8 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

1.   UMUM (lanjutan)                                         1.   GENERAL (continued)

     c.   IUPK    sebagai    Kelanjutan          Operasi          c.   IUPK     for  the    Continuation            of
          Kontrak/Perjanjian                                           Contract/Agreement Operation

          Kegiatan AI berdasarkan Perjanjian Karya                     AI’s activities were governed by the provisions
          Pengusahaan        Pertambangan   Batubara                   of a Coal Cooperation Agreement (“CCA”)
          (“PKP2B”) antara AI dan PT Tambang                           which was entered into by AI and
          Batubara Bukit Asam (Persero) Tbk (“PTBA”),                  PT Tambang Batubara Bukit Asam (Persero)
          dahulu Perusahaan Negara Tambang                             Tbk (“PTBA”), formerly Perusahaan Negara
          Batubara, tertanggal 16 November 1982.                       Tambang Batubara, on 16 November 1982.
          Berdasarkan Keputusan Presiden No.                           Based on Presidential Decree No. 75/1996
          75/1996, tertanggal 25 September 1996 dan                    dated 25 September 1996 and the
          perubahan PKP2B No. J2/Ji.DU/52/82 antara                    amendment to CCA No. J2/Ji.DU/52/82
          PTBA dan AI tertanggal 27 Juni 1997, semua                   between PTBA and AI on 27 June 1997, all of
          hak dan kewajiban PTBA dalam PKP2B                           the rights and obligations of PTBA under the
          dialihkan kepada Pemerintah Republik                         CCA were transferred to the Government of
          Indonesia (“Pemerintah”) yang diwakili oleh                  the Republic of Indonesia (the “Government”)
          Menteri Pertambangan dan Energi, efektif                     represented by the Minister of Mines and
          sejak 1 Juli 1997.                                           Energy, effective from 1 July 1997.

          Berdasarkan      ketentuan       PKP2B,       AI             Under the terms of the CCA, AI acts as a
          merupakan kontraktor Pemerintah yang                         contractor to the Government, and is
          bertanggung       jawab       atas       operasi             responsible for coal mining operations in an
          penambangan batubara di area yang                            area located in South Kalimantan. AI
          berlokasi di Kalimantan Selatan. AI memulai                  commenced its 30-year operating period
          periode operasi 30 tahunnya (kecuali                         (unless extended based on the terms and
          diperpanjang berdasarkan persyaratan dan                     conditions      in    the      CCA)       on
          ketentuan dalam PKP2B) pada tanggal                          1 October 1992 with coal produced from the
          1 Oktober 1992 dengan memproduksi                            Paringin area of interest. AI is entitled to
          batubara di area of interest Paringin. AI berhak             86.5% of the coal produced, with the
          atas 86,5% batubara yang diproduksi dan                      remaining     13.5%      representing    the
          13,5%      sisanya       merupakan        bagian             Government’s share of production.
          Pemerintah.

          Pada tanggal 18 September 2014, AI telah                     On 18 September 2014, AI signed a
          menandatangani Nota Kesepahaman (“MoU”)                      Memorandum of Understanding (“MoU”) with
          dengan Pemerintah untuk memperbarui                          the Government to amend its CCA. This MoU
          PKP2B AI. MoU ini ditandatangani dalam                       was signed within the framework of the
          rangka proses renegosiasi penyesuaian                        renegotiation process for adjustment of the
          PKP2B, yang hanya berkaitan dengan enam                      CCA, which only related to six strategic
          isu strategis yaitu: (i) Wilayah PKP2B,                      issues: (i) the CCA area, (ii) the continuation
          (ii) Kelanjutan Operasi Pertambangan,                        of Mining Operations, (iii) State Revenue,
          (iii) Penerimaan Negara, (iv) Kewajiban                      (iv) Obligations of Domestic Processing,
          Pengolahan Dalam Negeri, (v) Kewajiban                       (v) Obligations to Divest, and (vi) Use of Local
          Divestasi, dan (vi) Penggunaan Tenaga Kerja                  Labour, Goods and Domestic Services.
          Lokal, Barang-Barang, dan Jasa Dalam
          Negeri.

          Pada tanggal 17 Januari 2018, AI telah                       On 17 January 2018, AI signed an
          menandatangani amandemen PKP2B dengan                        amendment to the CCA (“Amendment to the
          Pemerintah     (“Amandemen       PKP2B”).                    CCA”) with the Government. This amendment
          Amandemen ini ditandatangan dengan tujuan                    was signed for the purpose of adjusting the
          untuk menyesuaikan ketentuan PKP2B untuk                     provisions of the CCA to comply with the
          memenuhi Undang-undang No. 4 Tahun 2009                      provisions of Law No. 4 of 2009 on Mineral
          tentang Pertambangan Mineral dan Batubara                    and Coal Mining pursuant to the requirements
          sesuai dengan persyaratan sebagaimana                        as set forth in Article 169 of the said law.
          dimaksud dalam Pasal 169.
Page 21
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/9 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

1.   UMUM (lanjutan)                                      1.   GENERAL (continued)

     c.   IUPK    sebagai      Kelanjutan     Operasi          c.        IUPK     for  the    Continuation     of
          Kontrak/Perjanjian (lanjutan)                                  Contract/Agreement Operation (continued)

          Pada tahun 2022, AI telah menerima Izin                        On 2022, AI has received a Special Mining
          Usaha Pertambangan Khusus sebagai                              Business Permit for the Continuation of
          Kelanjutan Operasi Kontrak/Perjanjian (“IUPK                   Contract/Agreement Operation (“IUPK for the
          sebagai          Kelanjutan          Operasi                   Continuation       of      Contract/Agreement
          Kontrak/Perjanjian”) yang diterbitkan oleh                     Operation”) issued by the Minister of
          Menteri Investasi/Kepala Badan Koordinasi                      Investment/Chairman of the Investment
          Penanaman Modal Republik Indonesia atas                        Coordinating Board of the Republic of
          nama Menteri Energi dan Sumber Daya                            Indonesia on behalf of the Minister of Energy
          Mineral tertanggal 13 September 2022. IUPK                     and Mineral Resources dated 13 September
          sebagai          Kelanjutan          Operasi                   2022. The IUPK for the Continuation of
          Kontrak/Perjanjian ini telah diberikan untuk                   Contract/Agreement Operation has been
          jangka waktu yang berakhir pada tanggal                        granted for a period expiring on 1 October
          1 Oktober 2032, yang dapat diperpanjang                        2032, which can be extended in accordance
          sesuai     dengan     ketentuan     peraturan                  with the prevailing regulations.
          perundang-undangan yang berlaku.

          Mulai 1 Januari 2023, ketentuan perpajakan                     Starting 1 January 2023, the provisions on
          dan/atau PNBP dilaksanakan sesuai dengan                       taxation and/or PNBP are implemented in
          ketentuan dalam Peraturan Pemerintah No.                       accordance with the Government Regulations
          15/2022 tentang Perlakuan Perpajakan                           No. 15/2022 Treatment of Taxation and/or
          dan/atau Penerimaan Negara Bukan Pajak di                      Payments of Non-Tax State Revenue in the
          Bidang Usaha Pertambangan Batubara                             coal mining sector (Note 40o).
          (Catatan 40o).

     d.    Perjanjian Kerjasama IBT                                 d.   IBT Cooperation Agreement

          Pada tanggal 25 Agustus 1990, IBT                              On 25 August 1990, IBT entered into a Basic
          mengadakan Perjanjian Dasar dengan                             Agreement with PT Pelabuhan Indonesia III
          PT Pelabuhan Indonesia III (Persero) (dahulu                   (Persero) (formerly Perum Pelabuhan III)
          Perum Pelabuhan III) (“Pelindo III”) untuk                     (“Pelindo   III”)  for  the   construction,
          pembangunan,        pengembangan,       dan                    development and operation of a Public Coal
          pengelolaan Pelabuhan Umum Batubara di                         Port in Pulau Laut, South Kalimantan.
          Pulau Laut, Kalimantan Selatan. Pada tanggal                   On 10 November 1994, IBT and PT
          10 November 1994, IBT dan PT Pelabuhan                         Pelabuhan Indonesia (Persero) (“Pelindo”)
          Indonesia (Persero) (“Pelindo”) (dahulu                        (formerly Pelindo III) amended the Basic
          Pelindo III) mengubah Perjanjian Dasar                         Agreement to a Cooperation Agreement
          menjadi Perjanjian Kerjasama (“Perjanjian                      (“Cooperation Agreement”). Under the terms
          Kerjasama”).     Berdasarkan      Perjanjian                   of the Cooperation Agreement, IBT
          Kerjasama, IBT memulai periode operasi                         commenced its 30-year operating period on
          30 tahunnya pada tanggal 21 Agustus 1997.                      21 August 1997.

          Perjanjian Kerjasama ini telah mengalami                       This Cooperation Agreement has been
          beberapa kali perubahan antara lain, terkait                   amended several times, among others related
          dengan royalti atau pembagian imbalan atas                     to royalties or the share of handling fees for
          jasa pengelolaan terminal curah batubara dan                   the management services of the coal bulk
          terminal curah cair, serta kategori aset IBT                   terminal and liquid bulk terminal and the
          yang akan dialihkan menjadi milik Pelindo                      category of assets of IBT that will become the
          setelah berakhirnya jangka waktu Perjanjian                    property of Pelindo upon the expiration of the
          Kerjasama.                                                     Cooperation Agreement.
Page 22
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/10 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                           30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

1.   UMUM (lanjutan)                                       1.   GENERAL (continued)

     d.    Perjanjian Kerjasama IBT (lanjutan)                  d.   IBT Cooperation Agreement (continued)

          Pada tanggal 6 Desember 2022, IBT, Pelindo                 On 6 December 2022, IBT, Pelindo and PT
          dan PT Pelindo Multi Terminal (“PMT”) telah                Pelindo Multi Terminal (“PMT”) signed the
          menandatangani Perjanjian Novasi Sebagian                  Partial Novation Agreement of the Cooperation
          atas Perjanjian Kerjasama, sehubungan                      Agreement, wherein all of Pelindo’s authorities,
          dengan seluruh tanggung jawab, hak dan                     rights, obligations and responsibilities relating to
          kewajiban Pelindo atas share handling fees                 share handling fees and dock services under the
          dan jasa dermaga berdasarkan Perjanjian                    Cooperation Agreement are transferred to PMT.
          Kerjasama dialihkan kepada PMT.

          Pada tanggal 4 Januari 2023, IBT dan PMT                   On 4 January 2023, IBT and PMT entered into
          menandatangani       Perjanjian        Dasar               Heads of Agreement in relation to the
          sehubungan dengan rencana pengembangan                     development plan of cooperation in the
          kerja sama pengoperasian fasilitas terminal di             operations of terminal facilities at Mekar Putih
          Pelabuhan Mekar Putih, Pulau Laut,                         Port, Pulau Laut, South Kalimantan.
          Kalimantan Selatan.

          Pada tanggal 25 Mei 2023, IBT mengakuisisi                 On 25 May 2023, IBT acquired 49% share of PT
          49% saham PT Terminal Curah Utama                          Terminal Curah Utama (“TCU’) from PMT. TCU
          (“TCU”) dari PMT. TCU bertanggung jawab                    has the responsibility to maintain the terminal
          untuk memelihara fasilitas terminal bahan                  fuel facilities in Mekar Putih Port.
          bakar di Pelabuhan Mekar Putih.

          Pada tanggal 16 Agustus 2024, IBT, Pelindo                 On August 16, 2024, IBT, Pelindo and PMT
          dan PMT telah menandatangani Perjanjian                    have signed a Cooperation Preparation
          Persiapan Kerja Sama Penyelenggaraan                       Agreement for the Implementation of Terminal
          Fasilitas Terminal di Pelabuhan Umum Mekar                 Facilities at Mekar Putih Port After the Expiration
          Putih     Setelah    Berakhirnya  Perjanjian               of      the    Cooperation     Agreement        No.
          Kerjasama       No:    61/SPP.PR.129/PIII.94               61/SPP.PR.129/PP:         61/SPP.PR.129/PIII.94
          tanggal 10 November 1994. Perjanjian ini                   dated November 10, 1994. This agreement
          menyepakati skema dan rencana kerja sama                   agreed on the scheme and plan for further
          lanjutan agar Grup dapat melanjutkan                       cooperation in order for the Group to continue
          pemanfaatan Pelabuhan Mekar Putih setelah                  utilizing Mekar Putih Port after the build, operate
          aset build, operate and transfer diserahkan                and transfer asset is transferred to Pelindo,
          kepada Pelindo, dengan berlandaskan janji-                 based on the promises of each party to sign
          janji dari masing-masing pihak untuk                       derivative agreements.
          menandatangani perjanjian turunan.

     e.   Perjanjian Kerjasama Pengelolaan Alur                 e.   Ambang Barito River Channel Management
          Ambang Sungai Barito                                       Cooperation Agreement

          Pada tanggal 28 Agustus 2007, PT Ambang                    On 28 August 2007, PT Ambang Barito
          Barito       Nusapersada        (“Ambapers”)               Nusapersada (“Ambapers”) appointed SDM as
          menetapkan SDM sebagai pemenang mitra                      a partnership winner to execute the dredging of
          kerja sama untuk melaksanakan pengerukan                   the Ambang Barito River Channel, which
          Alur Ambang Sungai Barito, termasuk                        includes river-mouth dredging, maintenance
          pengerukan mulut sungai, perawatan, dan                    dredging and financing of the channel dredging
          pembiayaan proyek pengerukan alur tersebut.                project. On 25 March 2008, SDM entered into
          Pada tanggal 25 Maret 2008, SDM                            an Ambang Barito River Channel Management
          mengadakan         Perjanjian      Kerjasama               Cooperation Agreement for a period of 15 years
          Pengelolaan Alur Ambang Sungai Barito untuk                commencing its operation date. Afterwards,
          jangka waktu 15 tahun terhitung sejak tanggal              SDM will be given the first right to consider an
          operasionalnya. Selanjutnya, SDM diberi hak                extension to extend for the next five years. On
          pertama       untuk       mempertimbangkan                 25 April 2022, SDM and Ambapers signed
          perpanjangan kerjasama untuk lima tahun                    Amendment I to the Ambang Barito River
          berikutnya. Pada tanggal 25 April 2022, SDM                Channel Management Cooperation Agreement
          dan Ambapers telah menandatangani                          to extend the cooperation period, therefore the
          Amandemen       I   Perjanjian     Kerjasama               agreement shall expire on 1 January 2029.
          Pengelolaan Alur Ambang Sungai Barito untuk
          memperpanjang jangka waktu kerjasama,
          sehingga jangka waktu perjanjian akan
          berakhir pada tanggal 1 Januari 2029.
Page 23
                                            PT ADARO ENERGY INDONESIA Tbk
                                       DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                          Lampiran 5/11 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                      30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                            unless otherwise stated)

1.   UMUM (lanjutan)                                                        1.         GENERAL (continued)

     e.    Perjanjian Kerjasama Pengelolaan Alur                                       e.     Ambang Barito River Channel Management
           Ambang Sungai Barito (lanjutan)                                                    Cooperation Agreement (continued)

           Ambapers mengenakan pungutan jasa alur                                             Ambapers charges a channel fee for every ship
           untuk setiap kapal yang melalui Alur Ambang                                        that passes through the Ambang Barito River
           Sungai Barito sebagaimana diperkenankan                                            Channel, to the extent permitted by the
           berdasarkan peraturan perundang-undangan                                           prevailing laws and regulations. Revenue from
           yang berlaku. Pendapatan dari pengelolaan                                          the management of channel fees is distributed
           alur ini dibagi antara Ambapers dan SDM                                            to Ambapers and SDM in the determined
           berdasarkan proporsi yang telah ditetapkan.                                        proportions.


     f.    Perjanjian     Karya   Pengusahaan                                          f.     Adaro MetCoal (“AMC”), PC and RC Coal
           Pertambangan Batubara Adaro MetCoal                                                Contracts of Work (“CCoWs”)
           (“AMC”), PC dan RC

           LC, JC, KC, MC dan SBC (secara keseluruhan                                         LC, JC, KC, MC and SBC (collectively referred
           dirujuk sebagai “entitas AMC”) serta PC dan                                        to as the “AMC entities”) and also PC and RC
           RC telah menandatangani PKP2B dengan                                               have entered into CCoWs with the Government
           Pemerintah untuk melakukan kegiatan                                                to conduct coal mining activities as follows:
           pengusahaan       pertambangan      batubara
           sebagai berikut:

                                                                                        Tahun perolehan
                                                                                         surat keputusan
                                                                                            peningkatan            Periode
                                                     Tanggal          Luas wilayah        tahap kegiatan          permulaan
                                    Tanggal
                                                   amandemen/             (tidak            operasi dari           operasi
                   Perusahaan/     perjanjian/
            No.                                    Amendment          diaudit)/Area        KESDM*)/ The         penambangan/              Lokasi/Location
                    Company        Agreement
                                                      date             (unaudited)      year of obtaining      Commencement
                                      date
                                                                    (Hektar/Hectare)    decision letter for       of mining
                                                                                             production           operations
                                                                                         operation stage
                                                                                           from MoEMR*)
              1        PC         19 April 1999    14 November               24,971             2024                   -            Kalimantan Timur /East
                                                       2017                                                                            Kalimantan
              2        RC          6 September     14 November               36,490               -                    -            Kalimantan Timur dan
                                      2000             2017                                                                            Kalimantan Tengah/East
                                                                                                                                       Kalimantan and Central
                                                                                                                                       Kalimantan
              3         LC         6 September     14 November               46,620             2015                 2016           Kalimantan Timur dan
                                      2000             2017                                                                            Kalimantan Tengah/East
                                                                                                                                       Kalimantan and Central
                                                                                                                                       Kalimantan
              4         JC         6 September     14 November               24,988             2020                   -            Kalimantan Tengah/Central
                                      2000             2017                                                                              Kalimantan
              5        KC          19 Februari/    14 November               24,988             2020                   -            Kalimantan Tengah/Central
                                  February 1998        2017                                                                              Kalimantan
              6        MC          19 Februari/    14 November               24,990             2017                 2019           Kalimantan Timur dan
                                  February 1998        2017                                                                             Kalimantan Tengah/East
                                                                                                                                        Kalimantan and Central
                                                                                                                                        Kalimantan
              7        SBC        19 April 1999    14 November               24,993             2020                   -            Kalimantan Tengah/Central
                                                       2017                                                                            Kalimantan

          *) Kementerian Energi dan Sumber Daya Mineral (“KESDM”)                             *) Ministry of Energy and Mineral Resources (“MoEMR”)


          Berdasarkan PKP2B tersebut, periode operasi                                         Based on the CCoWs, the operating period of
          wilayah pertambangan akan berlangsung                                               the relevant areas of interest is for a 30-year
          selama 30 tahun dari permulaan operasi                                              period from the first coal mining operation, or a
          penambangan yang pertama, atau periode                                              longer period agreed by the Government based
          yang lebih lama yang dapat disetujui oleh                                           on the written requests from the AMC entities,
          Pemerintah berdasarkan permohonan tertulis                                          PC or RC.
          dari entitas-entitas AMC, PC atau RC.
Page 24
                                             PT ADARO ENERGY INDONESIA Tbk
                                        DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                           Lampiran 5/12 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                        30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                     (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                              unless otherwise stated)

1.   UMUM (lanjutan)                                                           1.        GENERAL (continued)

     g.   Izin Usaha Pertambangan                                                        g.     Mining Business Permits

          Selain IUPK sebagai Kelanjutan Operasi                                                Other than the IUPK for the Continuation of
          Kontrak/Perjanjian yang dimiliki oleh AI dan                                          Contract/Agreement Operation entered into by AI
          PKP2B yang dimiliki setiap entitas AMC, PC                                            and the CCoWs entered into by the AMC entities,
          dan RC, Grup memiliki izin usaha                                                      PC and RC, the Group had the following mining
          pertambangan sebagai berikut:                                                         business permits:

                                   Surat Keputusan/Decree                            Izin/Permit
                                                                                                          Periode/         Luas wilayah
                                                                                                           Period         (tidak diaudit)/
                                                                                                                                                Lokasi/Location
                                                                                Jenis/     Pemegang/      (Tahun/        Area (unaudited)
           No.      Nomor/Number          Tanggal/Date         Oleh/By
                                                                                Type         Holder        Years)        (Hektar/Hectare)



            1     No. 503/188/KEP/        29 April 2010    Bupati Lahat/        IUPOP          MIP           20                       2,000     Kabupaten Lahat,
                  PERTAMBEN/2010                           Regent of Lahat                                                                      Provinsi Sumatera
                                                                                                                                                Selatan/Lahat
                                                                                                                                                Regency, South
                                                                                                                                                Sumatera
                                                                                                                                                Province


            2     No. 256/KPTS/           9 Maret/         Bupati Muara         IUPOP          BEE           20                      11,130     Kabupaten Muara
                  TAMBEN/2011*            March 2011       Enim/Regent of                                                                       Enim, Provinsi
                                                           Muara Enim                                                                           Sumatera
                                                                                                                                                Selatan/Muara
                                                                                                                                                Enim Regency,
                                                                                                                                                South Sumatera
                                                                                                                                                Province


            3     No. 0466 K/30/          12 Februari/     KESDM/MoEMR          IUPOP          PCS           20                       2,500     Kabupaten
                  MEM/2015**              February                                                        sampai                                Balangan, Provinsi
                                          2015                                                            dengan/                               Kalimantan
                                                                                                            until                               Selatan/Balangan
                                                                                                           2029                                 Regency, South
                                                                                                                                                Kalimantan
                                                                                                                                                Province


            4     No. 0427 K/30/          10 Februari/     KESDM/MoEMR          IUPOP          SCM           20                       2,500     Kabupaten
                  MEM/2015**              February                                                        sampai                                Balangan, Provinsi
                                          2015                                                            dengan/                               Kalimantan
                                                                                                            until                               Selatan/Balangan
                                                                                                           2029                                 Regency, South
                                                                                                                                                Kalimantan
                                                                                                                                                Province


            5     No. 0636 K/30/          24 Februari/     KESDM/MoEMR          IUPOP          LSA           20                       2,500     Kabupaten
                  MEM/2015                February                                                        sampai                                Balangan, Provinsi
                                          2015                                                            dengan/                               Kalimantan
                                                                                                            until                               Selatan/Balangan
                                                                                                           2034                                 Regency, South
                                                                                                                                                Kalimantan
                                                                                                                                                Province



          IUPOP: Izin Usaha Pertambangan Operasi dan Produksi/Operation and Production Mining Business Licence
          *Pada tanggal 8 Agustus 2024, AAI telah melepas seluruh kepemilikan sahamnya pada BEE/On 8 August 2024, AAI has divested all of its shares ownership in BEE
          **IUPOP yang diterbitkan berdasarkan Keputusan Bupati Balangan No. 188.45/83/Kum Tahun 2009 tanggal 8 April 2009 (PCS) dan Keputusan Bupati Balangan
          No. 188.45/131/Kum Tahun 2009 tanggal 21 Juli 2009 (SCM), keduanya disesuaikan dengan keputusan Menteri Energi dan Sumber Daya Mineral (“Menteri ESDM”)
          dalam rangka perubahan status keduanya menjadi Perusahaan Penanaman Modal Asing/IUPOP issued based on Decree of Regent of Balangan
          No. 188.45/83/Kum Year 2009 dated 8 April 2009 (PCS) and Decree of Regent of Balangan No. 188.45/131/Kum Year 2009 dated 21 July 2009 (SCM), both adjusted
          in accordance with the decree of the Minister of Energy and Mineral Resources (“Minister of EMR”) due to their change in status to Foreign Capital Investment
          Companies
Page 25
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/13 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION

     Berikut ini adalah informasi kebijakan akuntansi           Presented below are the material accounting policy
     material yang diterapkan dalam penyusunan laporan          information adopted in preparing the interim
     keuangan konsolidasian interim Grup. Kebijakan ini         consolidated financial statements of the Group.
     telah diaplikasikan secara konsisten terhadap semua        These policies have been consistently applied to all
     tahun yang disajikan, kecuali dinyatakan lain.             of the years presented, unless otherwise stated.

     a.    Dasar penyusunan laporan          keuangan           a.       Basis of preparation of the interim
           konsolidasian interim                                         consolidated financial statements

           Laporan keuangan konsolidasian interim Grup                   The Group’s interim consolidated financial
           telah disusun berdasarkan Pernyataan                          statements have been prepared in conformity
           Standar Akuntansi Keuangan dan Peraturan                      with   Indonesian    Financial  Accounting
           No. VIII.G.7 tentang “Penyajian dan                           Standards and Regulation No. VIII.G.7
           Pengungkapan Laporan Keuangan Emiten                          regarding “Financial Statement Presentation
           atau Perusahaan Publik”.                                      and Disclosures of Issuers or Public
                                                                         Companies”.

           Laporan keuangan konsolidasian interim telah                  The interim consolidated financial statements
           disusun     berdasarkan    konsep      harga                  have been prepared under the historical cost
           perolehan, kecuali untuk aset keuangan                        convention, except for financial assets which
           tertentu yang diakui berdasarkan nilai wajar,                 are recognised at fair value, and using the
           serta menggunakan dasar akrual kecuali                        accrual basis except for the consolidated
           untuk laporan arus kas konsolidasian.                         statements of cash flows.

           Penyusunan laporan keuangan konsolidasian                     The preparation of interim consolidated
           interim berdasarkan Standar Akuntansi                         financial statements in conformity with
           Keuangan      di   Indonesia   memerlukan                     Indonesian Financial Accounting Standards
           penggunaan estimasi dan asumsi akuntansi                      requires the use of certain critical accounting
           penting tertentu. Penyusunan laporan                          estimates and assumptions. It also requires
           keuangan juga mengharuskan manajemen                          management to exercise its judgement in the
           untuk membuat pertimbangan dalam proses                       process of applying the Group’s accounting
           penerapan kebijakan akuntansi Grup. Area-                     policies. The areas involving a higher degree
           area yang memerlukan tingkat pertimbangan                     of judgement or complexity, or areas where
           yang lebih tinggi atau kompleks, atau area                    assumptions and estimates are significant to
           dimana asumsi dan estimasi yang berdampak                     the interim consolidated financial statements
           signifikan terhadap laporan keuangan                          are disclosed in Note 3.
           konsolidasian interim diungkapkan dalam
           Catatan 3.
Page 26
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/14 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                          30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL               2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                (continued)

     b.   Perubahan pada Pernyataan Standar                    b.    Changes to Statements of Financial
          Akuntansi Keuangan (“PSAK”) dan                            Accounting Standards (“SFAS”) and
          Interpretasi Pernyataan Standar Akuntansi                  Interpretations of Statements of Financial
          Keuangan (“ISAK”)                                          Accounting Standards (“IFAS”)

          Penerapan dari amandemen terhadap standar                  The adoption of the following amendments to
          akuntansi, yang berlaku efektif sejak tanggal              accounting standards which are effective from
          1 Januari 2024 berikut tidak menyebabkan                   1 January 2024 did not result in substantial
          perubahan signifikan atas kebijakan akuntansi              changes to the Group’s accounting policies
          Grup dan tidak memberikan dampak yang                      and had no material effect on the amounts
          material terhadap jumlah yang dilaporkan di                reported in the interim consolidated financial
          laporan keuangan konsolidasian interim pada                statements for the current year:
          tahun berjalan:

             Amandemen PSAK No. 201, ”Penyajian                        Amendment        to   SFAS      No.   201,
              Laporan Keuangan - Klasifikasi Liabilitas                  “Presentation of Financial Statements -
              sebagai Jangka Pendek atau Jangka                          Classification of Liabilities as Current or
              Panjang”                                                   Non-Current"
             Amandemen PSAK No. 201, “Penyajian                        Amendment        to   SFAS      No.   201,
              Laporan Keuangan - Liabilitas Jangka                       “Presentation of Financial Statements -
              Panjang dengan Kovenan”                                    Long-term Liabilities with Covenants”
             Amandemen PSAK No. 207, “Laporan                          Amendments to SFAS No. 207,
              Arus Kas" dan PSAK No. 107, "Instrumen                     “Statement of Cash Flows” and SFAS No.
              Keuangan: Pengungkapan” - Pengaturan                       107, “Financial Instruments: Disclosure” -
              Pembiayaan Pemasok                                         Supplier Finance Arrangements
             Amandemen PSAK No. 116, “Sewa -                           Amendment to SFAS No. 116, “Leases -
              Liabilitas Sewa dalam Jual dan Sewa                        Lease Liability in a Sale and Leaseback”
              Balik”

          Standar baru dan amandemen yang telah                      The new standard and amendments issued
          diterbitkan berlaku efektif untuk tahun buku               effective for the financial year beginning
          yang        dimulai        pada       tanggal              1 January 2025 are as follows:
          1 Januari 2025 adalah sebagai berikut:

             PSAK No. 117 “Kontrak Asuransi”                           SFAS No. 117, “Insurance Contracts”
             Amendemen PSAK 117 Kontrak Asuransi                       The amendments to SFAS 117 “Insurance
              tentang penerapan awal PSAK 117 dan                        Contract” about initial application of SFAS
              PSAK 109 - informasi komparatif;                           117 and SFAS 109 - comparative
             Amandemen PSAK No. 221, “Pengaruh                          information;
              Perubahan Kurs Valuta Asing –                             Amendment to SFAS No. 221, “The Effect
              Kekurangan Ketertukaran”                                   of Changes in Foreign Exchange Rates –
                                                                         Lack of Exchangeability”

          Standar baru dan amandemen di atas berlaku                 The above new standard and amendments are
          efektif mulai 1 Januari 2025, dengan                       effective beginning 1 January 2025, with early
          penerapan dini diperkenankan.                              adoption is permitted.

          Pada tanggal penyelesaian laporan keuangan                 As at the completion date of these interim
          konsolidasian interim ini, Grup sedang                     consolidated financial statements, the Group
          mempelajari dampak yang mungkin timbul dari                is evaluating the potential impact of the new
          penerapan standar baru dan amandemen                       standard and amendments on the Group’s
          pada laporan keuangan konsolidasian interim                interim consolidated financial statements.
          Grup.
Page 27
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/15 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     c.   Prinsip-prinsip konsolidasi                                c.       Principles of consolidation

          i.   Entitas anak                                                   i.   Subsidiaries

               i.1. Konsolidasi                                                    i.1. Consolidation

                   Entitas anak merupakan semua                                        Subsidiaries     are     all   entities
                   entitas (termasuk entitas yang                                      (including structured entities) over
                   terstruktur), dimana Grup memiliki                                  which the Group has control. The
                   pengendalian. Grup mengendalikan                                    Group controls an entity when the
                   suatu entitas ketika Grup memiliki                                  Group is exposed to, or has rights to,
                   hak atas imbal hasil variabel dari                                  variable returns from its involvement
                   keterlibatannya dengan suatu entitas                                with the entity and has the ability to
                   dan memiliki kemampuan untuk                                        affect those returns through its
                   mempengaruhi imbal hasil tersebut                                   power over the entity.
                   melalui kekuasaannya atas entitas
                   tersebut.

                   Entitas anak dikonsolidasi sejak                                    Subsidiaries are consolidated from
                   tanggal pengendalian beralih kepada                                 the date on which control is
                   Grup dan tidak lagi dikonsolidasi                                   transferred to the Group and are
                   sejak       tanggal       hilangnya                                 de-consolidated from the date on
                   pengendalian.                                                       which that control ceases.

                   Saldo, transaksi, penghasilan, dan                                  Intragroup balances, transactions,
                   beban intra kelompok usaha                                          income     and     expenses     are
                   dieliminasi.    Keuntungan      dan                                 eliminated. Profits and losses
                   kerugian hasil dari transaksi intra                                 resulting      from      intragroup
                   kelompok usaha yang diakui dalam                                    transactions that are recognised in
                   aset juga dieliminasi. Kebijakan                                    assets are also eliminated. The
                   akuntansi entitas anak telah diubah                                 accounting policies of subsidiaries
                   seperlunya     untuk    memastikan                                  have     been     amended     where
                   konsistensi penerapan kebijakan                                     necessary to ensure consistency
                   oleh Grup.                                                          with the policies adopted by the
                                                                                       Group.

               i.2. Akuisisi                                                       i.2. Acquisition

                   Grup menerapkan metode akuisisi                                     The Group applies the acquisition
                   untuk mencatat setiap kombinasi                                     method to account for business
                   bisnis. Imbalan yang dialihkan untuk                                combinations. The consideration
                   mengakuisisi entitas anak adalah                                    transferred for the acquisition of a
                   nilai wajar seluruh aset yang                                       subsidiary is the fair value of the
                   dialihkan, liabilitas yang diakui oleh                              assets transferred, the liabilities
                   pihak pengakuisisi kepada pemilik                                   incurred to the former owners of the
                   sebelumnya dari entitas yang                                        acquiree and the equity interests
                   diakuisisi dan kepentingan ekuitas                                  issued by the Group.
                   yang diterbitkan oleh Grup.

                   Imbalan yang dialihkan termasuk nilai                               The       consideration      transferred
                   wajar setiap aset dan liabilitas yang                               includes the fair value of any asset
                   dihasilkan dari suatu kesepakatan                                   or liability resulting from a contingent
                   imbalan          kontinjensi.       Aset                            consideration arrangement. Identifiable
                   teridentifikasi, liabilitas dan liabilitas                          assets acquired, liabilities and
                   kontinjensi yang diambil alih, yang                                 contingent liabilities assumed in a
                   diperoleh dalam kombinasi bisnis                                    business combination are measured
                   diukur pada awalnya sebesar nilai                                   initially at their fair values as at the
                   wajar pada tanggal akuisisi.                                        acquisition date.
Page 28
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/16 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                  c.       Principles of consolidation (continued)

          i.   Entitas anak (lanjutan)                                     i.   Subsidiaries (continued)

               i.2. Akuisisi (lanjutan)                                         i.2. Acquisition (continued)

                   Grup      mengakui        kepentingan                            The     Group      recognises       any
                   non-pengendali pada pihak yang                                   non-controlling interest in the
                   diakuisisi baik sebesar nilai wajar                              acquiree on an acquisition-by-
                   atau sebesar bagian proporsional                                 acquisition basis, either at fair value
                   kepentingan non-pengendali atas                                  or at the non-controlling interest’s
                   aset neto teridentifikasi pihak                                  proportionate      share      of    the
                   yang      diakuisisi.     Kepentingan                            acquiree’s identifiable net assets.
                   non-pengendali disajikan di ekuitas                              Non-controlling       interests     are
                   dalam laporan posisi keuangan                                    reported as equity in the interim
                   konsolidasian interim, terpisah dari                             consolidated statements of financial
                   ekuitas pemilik entitas induk.                                   position, separate from the owners
                                                                                    of the parent entity.

                   Biaya terkait akuisisi dibebankan                                Acquisition-related   costs        are
                   pada saat terjadinya.                                            expensed as incurred.

                   Jika kombinasi bisnis diperoleh                                  If the business combination is
                   secara     bertahap,     Grup     akan                           achieved in stages, the Group will
                   mengukur kepentingan ekuitas yang                                remeasure its previously held equity
                   sebelumnya dimiliki pada pihak yang                              interest in the acquiree at its fair
                   diakuisisi sebesar nilai wajar pada                              value at its acquisition date and
                   tanggal akuisisi dan mengakui                                    recognise the resulting gain or loss,
                   keuntungan atau kerugian yang                                    if any, in profit or loss. Any
                   dihasilkan, jika ada, dalam laba rugi.                           contingent consideration to be
                   Imbalan kontinjensi yang masih                                   transferred by the Group is
                   harus dialihkan oleh Grup diakui                                 recognised at its fair value as at the
                   sebesar nilai wajar pada tanggal                                 acquisition    date.      Subsequent
                   akuisisi. Perubahan selanjutnya atas                             changes to the fair value of the
                   nilai wajar imbalan kontinjensi yang                             contingent consideration that is
                   diakui sebagai aset atau liabilitas dan                          deemed to be an asset or a liability
                   dicatat dalam laba rugi. Imbalan                                 are recognised in profit or loss. A
                   kontinjensi yang diklasifikasikan                                contingent consideration that is
                   sebagai ekuitas tidak diukur kembali                             classified   as    equity     is   not
                   dan      penyelesaian      selanjutnya                           remeasured, and its subsequent
                   diperhitungkan dalam ekuitas.                                    settlement is accounted for within
                                                                                    equity.
Page 29
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/17 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                  c.       Principles of consolidation (continued)

          i.    Entitas anak (lanjutan)                                    i.    Subsidiaries (continued)

                i.2. Akuisisi (lanjutan)                                         i.2. Acquisition (continued)

                    Selisih lebih antara imbalan yang                                 The excess of the consideration
                    dialihkan, jumlah setiap kepentingan                              transferred, the amount of any
                    non-pengendali dalam pihak yang                                   non-controlling interests in the
                    diakuisisi, dan nilai wajar pada                                  acquiree and the acquisition date fair
                    tanggal akuisisi dari kepemilikan                                 value of any previous equity interest
                    ekuitas yang sebelumnya dimiliki                                  in the acquiree over the fair value of
                    oleh pihak pengakuisisi pada pihak                                the Group’s share of the identifiable
                    yang       diakuisisi,  dibandingkan                              net assets acquired is recorded as
                    dengan nilai wajar bagian Grup atas                               goodwill. If those amounts are less
                    aset bersih teridentifikasi yang                                  than the fair value of the net
                    diakuisisi, dicatat sebagai goodwill.                             identifiable assets of the subsidiary
                    Jika jumlah tersebut lebih kecil dari                             acquired and the measurement of all
                    nilai wajar atas aset bersih                                      amounts has been reviewed, in the
                    teridentifikasi entitas anak yang                                 case of a bargain purchase, the
                    diakuisisi dan pengukuran atas                                    difference is recognised directly in
                    seluruh jumlah tersebut telah                                     profit or loss.
                    ditelaah, dalam hal pembelian
                    dengan diskon, selisih tersebut
                    diakui secara langsung dalam laba
                    rugi.

          ii.   Perubahan kepemilikan atas entitas                         ii.   Changes in ownership interest in
                anak tanpa kehilangan pengendalian                               subsidiaries without loss of control

                Transaksi       dengan       kepentingan                         Transactions      with     non-controlling
                non-pengendali          yang        tidak                        interests that do not result in a loss of
                mengakibatkan hilangnya pengendalian                             control are accounted for as equity
                dicatat sebagai transaksi ekuitas. Selisih                       transactions. The difference between the
                antara nilai wajar imbalan yang                                  fair value of any consideration paid and
                dibayarkan dan bagiannya atas jumlah                             the relevant share acquired of the carrying
                tercatat aset neto yang diperoleh dicatat                        amount of net assets of the subsidiary is
                dalam ekuitas. Keuntungan atau kerugian                          recorded in equity. Gains or losses on
                atas pelepasan kepada kepentingan non-                           disposals to non-controlling interests are
                pengendali juga dicatat pada ekuitas.                            also recorded in equity.

          iii. Pelepasan entitas anak                                      iii. Disposal of subsidiaries

                Ketika Grup kehilangan pengendalian                              When the Group loses control of a
                atas entitas anak, Grup menghentikan                             subsidiary, the Group derecognises the
                pengakuan aset (termasuk setiap                                  assets (including any goodwill) and
                goodwill) dan liabilitas entitas anak pada                       liabilities of the subsidiary at their carrying
                nilai tercatatnya ketika pengendalian                            amounts as at the date on which control is
                hilang. Jumlah yang sebelumnya diakui                            lost. Amounts previously recognised in
                dalam penghasilan komprehensif lain                              other comprehensive income are also
                juga direklasifikasi ke laba rugi atau                           reclassified to profit or loss or transferred
                dialihkan secara langsung ke saldo laba                          directly to retained earnings if required
                jika disyaratkan oleh PSAK lain.                                 under other SFAS.
Page 30
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/18 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                c.       Principles of consolidation (continued)

          iii. Pelepasan entitas anak (lanjutan)                         iii. Disposal of subsidiaries (continued)

              Sisa investasi pada entitas anak                               Any investment retained in the former
              terdahulu diakui sebesar nilai wajarnya.                       subsidiary is recognised at its fair value.
              Setiap perbedaan antara nilai tercatat                         The difference between the carrying
              sisa investasi pada tanggal hilangnya                          amount of the investment retained at the
              pengendalian dan nilai wajarnya diakui                         date when the control is lost and its fair
              dalam laba rugi.                                               value is recognised in profit or loss.

          iv. Akuntansi entitas asosiasi dan ventura                     iv. Accounting for associates and joint
              Bersama                                                        ventures

              Entitas asosiasi adalah suatu entitas                          An associate is an entity over which the
              dimana Grup mempunyai pengaruh                                 Group has significant influence, but not
              signifikan, tetapi tidak mengendalikan,                        control, generally accompanied by a
              dan biasanya Grup memiliki 20% atau                            shareholding giving rise to voting rights of
              lebih hak suara, tetapi tidak melebihi 50%                     20% or greater but not exceeding 50%.
              hak suara. Investasi pada entitas asosiasi                     Investments in associates are accounted
              dicatat    pada      laporan     keuangan                      for in the interim consolidated financial
              konsolidasian interim menggunakan                              statements using the equity method less
              metode ekuitas dikurangi kerugian                              impairment losses, if any.
              penurunan nilai, jika ada.

              Ventura bersama merupakan pengaturan                           A joint venture is a joint arrangement in
              bersama antara beberapa pihak yang                             which the parties that share joint control
              melakukan kesepakatan pengendalian                             have rights to the net assets of the
              bersama yang memiliki hak atas aset neto                       arrangement.      Joint    ventures   are
              pengaturan tersebut. Ventura bersama ini                       accounted for using the equity method
              menggunakan metode ekuitas dikurangi                           less impairment losses, if any.
              kerugian penurunan nilai, jika ada.

              -   Akuisisi                                                   -    Acquisitions

                  Investasi pada entitas asosiasi atau                            Investment in an associate or a joint
                  ventura bersama pada awalnya                                    venture is initially recognised at cost.
                  diakui sebesar biaya perolehan.                                 The cost of an acquisition is
                  Biaya perolehan diukur berdasarkan                              measured at the fair value of the
                  nilai wajar aset yang diserahkan,                               assets        transferred,       equity
                  instrumen ekuitas yang diterbitkan                              instruments issued or liabilities
                  atau liabilitas yang timbul atau                                incurred or assumed as at the date of
                  diambil alih pada tanggal akuisisi,                             exchange, plus costs directly
                  ditambah biaya yang berhubungan                                 attributable to the acquisition.
                  langsung dengan akuisisi.

                  Goodwill pada akuisisi entitas                                  Goodwill on the acquisition of an
                  asosiasi atau ventura bersama                                   associate or a joint venture
                  merupakan selisih lebih yang terkait                            represents the excess of the cost of
                  dengan biaya perolehan investasi                                acquisition of the associate or joint
                  pada entitas asosiasi atau ventura                              venture over the Group’s share of the
                  bersama dengan bagian Grup atas                                 fair value of the identifiable net
                  nilai wajar neto aset teridentifikasi                           assets of the associate or joint
                  dari entitas asosiasi atau ventura                              venture and is included in the
                  bersama dan dimasukkan dalam                                    carrying amount of the investment.
                  jumlah tercatat investasi.
Page 31
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/19 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                c.       Principles of consolidation (continued)

          iv. Akuntansi entitas asosiasi dan ventura                     iv. Accounting for associates and joint
              bersama (lanjutan)                                             ventures (continued)

              -   Metode ekuitas                                             -    Equity method

                  Dalam menerapkan metode ekuitas,                                In applying the equity method of
                  bagian Grup atas laba rugi entitas                              accounting, the Group’s share of its
                  asosiasi atau ventura bersama                                   associate’s or joint venture’s post-
                  setelah perolehan diakui dalam laba                             acquisition profit or loss is
                  rugi, dan bagian Grup atas                                      recognised in profit or loss and its
                  penghasilan    komprehensif     lain                            share of post-acquisition other
                  setelah tanggal perolehan diakui                                comprehensive        income       is
                  dalam penghasilan komprehensif                                  recognised in other comprehensive
                  lain.                                                           income.

                  Perubahan        dan      penerimaan                            These post-acquisition movements
                  distribusi dari entitas asosiasi atau                           and distributions received from an
                  ventura bersama setelah tanggal                                 associate or a joint venture are
                  perolehan disesuaikan terhadap nilai                            adjusted against the carrying
                  tercatat investasi.                                             amounts of the investment.

                  Jika bagian Grup atas rugi entitas                              When the Group’s share of the
                  asosiasi atau ventura bersama                                   losses of an associate or a joint
                  sama     dengan     atau    melebihi                            venture equals or exceeds its
                  kepentingannya      pada      entitas                           interest in the associate or joint
                  asosiasi atau ventura bersama,                                  venture,   including   any     other
                  termasuk piutang tidak lancar tanpa                             unsecured non-current receivables,
                  jaminan, maka Grup menghentikan                                 the Group does not recognise further
                  pengakuan bagiannya atas rugi lebih                             losses, unless it has obligations to
                  lanjut,   kecuali   Grup    memiliki                            make or has made payments on
                  kewajiban      untuk      melakukan                             behalf of the associate or joint
                  pembayaran atau telah melakukan                                 venture.
                  pembayaran atas nama entitas
                  asosiasi atau ventura bersama.

                  Keuntungan yang belum direalisasi                               Unrealised gains on transactions
                  atas transaksi antara Grup dengan                               between the Group and its associate
                  entitas asosiasi atau ventura                                   or joint venture are eliminated to the
                  bersama dieliminasi sebesar bagian                              extent of the Group’s interest in the
                  Grup dalam entitas asosiasi atau                                associate      or    joint    venture.
                  ventura bersama tersebut. Kerugian                              Unrealised      losses     are    also
                  yang     belum      direalisasi   juga                          eliminated unless the transaction
                  dieliminasi kecuali transaksi tersebut                          provides evidence of impairment of
                  memberikan bukti penurunan nilai                                the asset being transferred. The
                  atas aset yang ditransfer. Kebijakan                            accounting policies of the associate
                  akuntansi entitas asosiasi atau                                 or joint venture have been changed
                  ventura bersama akan disesuaikan,                               where      necessary      to   ensure
                  apabila diperlukan, agar konsisten                              consistency with the accounting
                  dengan kebijakan akuntansi Grup.                                policies adopted by the Group.
Page 32
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/20 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                           30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     c.   Prinsip-prinsip konsolidasi (lanjutan)                c.   Principles of consolidation (continued)

          iv. Akuntansi entitas asosiasi dan ventura                 iv. Accounting for associates and joint
              bersama (lanjutan)                                         ventures (continued)

              -   Metode ekuitas (lanjutan)                              -    Equity method (continued)

                  Dividen yang akan diterima dari                             Dividends receivable from an
                  entitas asosiasi atau ventura                               associate or a joint venture are
                  bersama diakui sebagai pengurang                            recognised as reductions in the
                  jumlah tercatat investasi.                                  carrying amounts of the investment.

                  Pada setiap tanggal pelaporan, Grup                         At each reporting date, the Group
                  menentukan apakah terdapat bukti                            determines whether there is any
                  objektif    bahwa    telah    terjadi                       objective      evidence   that    the
                  penurunan nilai atas investasi pada                         investment in an associate or joint
                  entitas asosiasi atau ventura                               venture is impaired. If any such
                  bersama. Jika bukti tersebut ada,                           evidence       exists,  the    Group
                  maka Grup menghitung besarnya                               calculates the amount of impairment
                  penurunan nilai sebagai selisih                             as the difference between the
                  antara jumlah yang terpulihkan dan                          recoverable amount of the associate
                  nilai tercatat atas investasi pada                          or the joint venture and its carrying
                  entitas asosiasi atau ventura                               amount and recognises the amount
                  bersama dan mengakui selisih                                in profit or loss.
                  tersebut pada laba rugi.

              -   Pelepasan                                              -    Disposals

                  Investasi pada entitas asosiasi atau                        An investment in an associate or a
                  ventura       bersama       dihentikan                      joint venture is derecognised when
                  pengakuannya apabila Grup tidak                             the Group loses significant influence
                  lagi memiliki pengaruh signifikan dan                       and joint control. The Group
                  pengendalian       bersama.      Grup                       measures the remaining investment
                  mengukur investasi yang tersisa                             at fair value. The difference between
                  sebesar nilai wajar. Selisih antara                         the carrying amount of the retained
                  jumlah tercatat investasi yang tersisa                      interest at the date when significant
                  pada tanggal hilangnya pengaruh                             influence is lost and its fair value is
                  signifikan dan nilai wajarnya diakui                        recognised in profit or loss.
                  dalam laba rugi.

                  Keuntungan dan kerugian yang                                Gains and losses arising from partial
                  timbul dari pelepasan sebagian atau                         disposal or dilution of an investment
                  dilusi yang timbul pada investasi                           in an associate or a joint venture in
                  pada entitas asosiasi atau ventura                          which significant influence and joint
                  bersama dimana pengaruh signifikan                          control is retained are recognised in
                  dan pengendalian bersama masih                              profit or loss, and only a
                  dipertahankan diakui dalam laba rugi                        proportionate share of the amount
                  dan hanya suatu bagian proporsional                         previously recognised in other
                  atas jumlah yang telah diakui                               comprehensive          income      is
                  sebelumnya      pada    penghasilan                         reclassified to profit or loss where
                  komprehensif lain yang direklasifikasi                      appropriate.
                  ke laba rugi.
Page 33
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/21 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   2.    MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     d.   Penjabaran mata uang asing                                d.       Foreign currency translation

          i.    Mata uang fungsional dan penyajian                           i.    Functional and presentation currency

                Akun-akun yang disertakan dalam                                    Items included in the financial statements
                laporan keuangan setiap entitas anggota                            of each of the Group’s entities are
                Grup diukur menggunakan mata uang                                  measured using the currency of the
                dari lingkungan ekonomi utama dimana                               primary economic environment in which
                entitas tersebut beroperasi (“mata uang                            the relevant entity operates (the
                fungsional”).     Laporan      keuangan                            “functional currency”). The interim
                konsolidasian interim disajikan dalam                              consolidated financial statements are
                Dolar Amerika Serikat (“AS$” atau “Dolar                           presented in United States Dollars (“US$”
                AS”), yang merupakan mata uang                                     or “US Dollars”), which is the Company’s
                fungsional Perusahaan dan penyajian                                functional currency and the Group’s
                Grup.                                                              presentation currency.

          ii.   Transaksi dan saldo                                          ii.   Transactions and balances

                Transaksi dalam mata uang asing                                    Foreign currency transactions are
                dijabarkan menjadi mata uang fungsional                            translated into the functional currency
                menggunakan kurs yang berlaku pada                                 using the exchange rates prevailing as at
                tanggal    transaksi.   Pada      tanggal                          the date of the transactions. As at the
                pelaporan, setiap aset dan liabilitas                              reporting date, monetary assets and
                moneter dalam mata uang asing                                      liabilities denominated in foreign currency
                disesuaikan untuk mencerminkan kurs                                are adjusted to reflect the prevailing
                yang berlaku pada tanggal tersebut.                                exchange rates at such date. Foreign
                Keuntungan dan kerugian selisih kurs                               exchange gains and losses resulting from
                yang timbul dari penyelesaian transaksi                            the settlement of such transactions and
                dalam mata uang asing dan dari                                     from the translation at year-end
                penjabaran aset dan liabilitas moneter                             exchange rates of monetary assets and
                dalam mata uang asing menggunakan                                  liabilities   denominated      in    foreign
                kurs yang berlaku pada akhir tahun                                 currencies are recognised in profit or loss.
                pelaporan diakui dalam laba rugi.

                Kurs yang digunakan pada tanggal                                   As at the interim consolidated statements
                laporan posisi keuangan konsolidasian                              of financial position dates, the exchange
                interim, berdasarkan kurs tengah yang                              rates used, based on the middle rates
                diterbitkan Bank Indonesia, adalah                                 published by Bank Indonesia, were as
                sebagai berikut (dalam Dolar AS penuh):                            follows (full US Dollars amount):

                                           30 September             31 December/
                                               2024                December 2023

                Rupiah 10.000 (“Rp”)                   0.66                        0.65                 Rupiah 10,000 (“Rp”)
                Dolar Singapura (“S$”)                 0.78                        0.76              Singapore Dollars (“S$”)
                Dolar Australia (“A$”)                 0.69                        0.69              Australian Dollars (“A$”)
                Euro (“€”)                             1.11                        1.11                             Euro (“€”)
Page 34
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/22 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     d.   Penjabaran mata uang asing (lanjutan)                  d.       Foreign currency translation (continued)

          iii. Entitas dalam Grup                                         iii. Group companies

              Hasil usaha operasi dan posisi keuangan                         The results of the operations and financial
              dari seluruh entitas anak Grup (tidak ada                       position of all of the Group’s subsidiaries
              yang mata uang fungsionalnya mata uang                          (none of which has the currency of a
              dari suatu ekonomi hiperinflasi) yang                           hyperinflationary economy) that have a
              memiliki mata uang fungsional yang                              functional currency different from the
              berbeda dengan mata uang penyajian                              Company’s presentation currency are
              Perusahaan, ditranslasikan dalam mata                           translated      into    the     Company’s
              uang penyajian Perusahaan sebagai                               presentation currency as follows:
              berikut:

              (a) Aset dan liabilitas yang disajikan                          (a) The assets and liabilities presented
                  pada laporan posisi keuangan                                    in    the    interim     consolidated
                  konsolidasian interim, dijabarkan                               statements of financial position are
                  pada kurs penutup tanggal laporan                               translated at the closing rate at the
                  posisi    keuangan   konsolidasian                              date of the interim consolidated
                  interim tersebut;                                               statements of financial position;

              (b) Penghasilan dan beban untuk setiap                          (b) The income and expenses for each
                  pos      laba     rugi     dijabarkan                           profit or loss item are translated at
                  menggunakan kurs rata-rata (kecuali                             the average exchange rates (unless
                  jika   rata-rata    tersebut    bukan                           this average is not a reasonable
                  perkiraan wajar efek kumulatif dari                             approximation of the cumulative
                  kurs yang berlaku pada tanggal                                  effect of the rates prevailing on the
                  transaksi, maka penghasilan dan                                 transaction dates, in which case the
                  beban dijabarkan menggunakan kurs                               income and expenses are translated
                  tanggal transaksi); dan                                         at the rates in force on the dates of
                                                                                  the transactions); and

              (c) Seluruh selisih kurs yang timbul                            (c) All of the resulting exchange
                  diakui    dalam       penghasilan                               differences are recognised in other
                  komprehensif lain.                                              comprehensive income.

              Pada konsolidasi, selisih kurs yang timbul                      On consolidation, exchange differences
              dari penjabaran investasi neto pada                             arising from the translation of any net
              entitas asing dan instrumen keuangan                            investments in foreign entities and other
              lainnya yang ditetapkan sebagai lindung                         financial instruments designated as
              nilai atas investasi tersebut, diakui dalam                     hedges of such investments, are
              penghasilan komprehensif lain. Ketika                           recognised in other comprehensive
              investasi dijual, selisih kurs yang terkait                     income. When the investment is sold, the
              direklasifikasi ke laba rugi.                                   associated exchange differences are
                                                                              reclassified to profit or loss.

     e.   Kas dan setara kas                                     e.       Cash and cash equivalents

          Kas dan setara kas termasuk kas, kas di bank,                   Cash and cash equivalents consist of cash on
          dan deposito berjangka yang jatuh tempo                         hand, cash in banks and time deposits with
          dalam jangka waktu tiga bulan atau kurang                       maturity periods of three months or less at the
          pada saat penempatan yang tidak digunakan                       time of placement that are not used as
          sebagai jaminan atau tidak dibatasi                             collateral or are not restricted.
          penggunaannya.

          Laporan arus kas konsolidasian disusun                          The consolidated statements of cash flows
          menggunakan metode langsung dengan                              have been prepared using the direct method
          mengklasifikasikan arus kas berdasarkan                         by classifying the cash flows on the basis of
          aktivitas operasi, investasi, dan pendanaan.                    operating, investing and financing activities.
Page 35
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/23 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     f.   Piutang                                                 f.       Receivables

          Piutang usaha adalah jumlah terutang dari                        Trade receivables are amounts due from
          pelanggan atas penjualan batubara dan listrik                    customers for coal and electricity sold or
          atau jasa yang diberikan dalam kegiatan                          services performed in the ordinary course of
          usaha biasa. Piutang non-usaha merupakan                         business. Non-trade receivables are amounts
          jumlah terutang yang timbul dari transaksi di                    arising from transactions outside of the
          luar kegiatan usaha biasa. Jika piutang                          ordinary course of business. If the collection of
          diperkirakan tertagih dalam satu tahun atau                      the receivables is expected within one year or
          kurang, piutang tersebut diklasifikasikan                        less, they are classified as current assets. If
          sebagai aset lancar. Jika tidak, piutang                         not, they are presented as non-current assets
          tersebut disajikan sebagai aset tidak lancar                     in the interim consolidated statements of
          pada laporan posisi keuangan konsolidasian                       financial position.
          interim.

          Piutang usaha pada awalnya diakui sebesar                        Trade receivables are recognised initially at
          nilai wajar dan kemudian diukur sebesar biaya                    fair value and subsequently measured at
          perolehan diamortisasi dengan menggunakan                        amortised cost using the effective interest
          metode suku bunga efektif, jika efek                             method, if the impact of discounting is
          pendiskontoan signifikan, dikurangi dengan                       significant, less any loss allowance.
          cadangan kerugian.

          Kerugian penurunan nilai piutang disajikan                       Impairment losses on receivables are
          sebagai bagian dari beban usaha pada laba                        presented as part of operating expenses in
          rugi. Jumlah yang selanjutnya dapat                              profit or loss. Subsequent recoveries of
          dipulihkan kembali atas piutang yang                             amounts previously written off are credited
          sebelumnya        telah     dihapusbukukan,                      against the same line item.
          dikreditkan terhadap item baris yang sama.

          Lihat Catatan 2i untuk informasi lebih lanjut                    See Note 2i for further information regarding
          mengenai kebijakan penentuan jumlah                              the policy on the determination of the amount
          cadangan kerugian piutang Grup.                                  for the loss allowance on the Group’s
                                                                           receivables.

          Piutang non-usaha dari pihak berelasi pada                       Non-trade receivables from related parties are
          awalnya disajikan sebagai aset tidak lancar                      initially presented as non-current assets
          kecuali jika ada alasan tertentu untuk disajikan                 unless there are specific reasons for them to
          sebagai aset lancar pada laporan posisi                          be presented as current assets in the interim
          keuangan konsolidasian interim.                                  consolidated statements of financial position.

     g.   Piutang dari pengaturan jasa konsesi                    g.       Receivables from        service    concession
                                                                           arrangements

          Piutang yang timbul dari proyek konsesi                          Receivables due from the concession project
          merupakan jasa yang diberikan sehubungan                         represent services provided in connection
          dengan pengaturan konsesi jasa dimana                            with a service concession arrangement for
          minimum      pembayaran     terjamin    telah                    which guaranteed minimum payments have
          disepakati terlepas dari jumlah pemakaian.                       been agreed upon irrespective of the extent of
          Karena panjangnya rencana pembayaran,                            use. Due to the length of the payment plans,
          piutang dicatat sebesar nilai kini dari                          receivables are the present value of future
          penerimaan      kas   yang     dijamin   dan                     guaranteed cash receipts discounted using a
          didiskontokan dengan menggunakan tingkat                         certain interest rate. The annual accumulation
          suku bunga tertentu. Bunga piutang yang                          of interest on these receivables is presented
          diakumulasikan dalam setahun dicatat                             as finance income from the service
          sebagai     pendapatan     keuangan      dari                    concession arrangement using the effective
          pengaturan       konsesi    jasa      dengan                     interest method. Payments will be divided into
          menggunakan metode suku bunga efektif.                           a portion to be deducted from the receivables
          Pembayaran akan dibagi menjadi bagian yang                       and interest on the unpaid amounts.
          akan dikurangkan dari piutang dan bunga atas
          jumlah yang belum dibayar.
Page 36
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/24 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     h.   Persediaan                                             h.       Inventories

          Persediaan batubara dinilai berdasarkan nilai                   Coal inventories are stated at the lower of cost
          terendah antara harga perolehan atau nilai                      or net realisable value. Cost is determined
          realisasi neto. Harga perolehan ditentukan                      based on the weighted average method which
          dengan metode rata-rata tertimbang yang                         includes mining costs, direct labour costs,
          mencakup biaya penambangan, biaya tenaga                        other direct costs and an appropriate portion
          kerja langsung, biaya langsung lainnya, dan                     of fixed and variable overheads related to
          alokasi bagian biaya overhead tetap dan                         mining operations. It excludes borrowing
          variabel yang berkaitan dengan kegiatan                         costs. The net realisable value is the
          penambangan. Biaya tersebut tidak termasuk                      estimated selling price in the ordinary course
          biaya pinjaman. Nilai realisasi neto adalah                     of business less the estimated costs of
          estimasi harga jual dalam kegiatan usaha                        completion and the estimated costs
          biasa dikurangi estimasi biaya penyelesaian                     necessary to make the sale.
          dan estimasi biaya yang diperlukan untuk
          membuat penjualan.

          Persediaan suku cadang, bahan bakar, dan                        Spare parts, fuel and supplies are valued at
          perlengkapan dinilai dengan harga perolehan                     cost less a provision for obsolete and slow-
          dikurangi dengan provisi persediaan usang                       moving items. Cost of spare parts and
          dan bergerak lambat. Harga perolehan suku                       supplies is determined based on the moving
          cadang dan perlengkapan ditentukan dengan                       average method while cost of fuel is
          metode rata-rata bergerak sedangkan harga                       determined based on the weighted average
          perolehan untuk bahan bakar ditentukan                          method. A provision for obsolete and slow-
          dengan metode rata-rata tertimbang. Provisi                     moving items is determined on the basis of the
          persediaan usang dan bergerak lambat                            estimated future usage or sale of individual
          ditentukan berdasarkan estimasi penggunaan                      inventory items. Supplies of maintenance
          atau    penjualan     masing-masing    jenis                    materials are charged to production costs in
          persediaan pada masa mendatang. Bahan                           the period in which they are used.
          pendukung kegiatan pemeliharaan dicatat
          sebagai beban produksi pada periode
          digunakan.

     i.   Aset keuangan                                          i.       Financial assets

          i.   Klasifikasi,      pengakuan          dan                   i.   Classification,       recognition         and
               pengukuran                                                      measurement

               Grup mengklasifikasikan aset keuangan                           The Group classifies its financial assets
               dalam kategori berikut ini:                                     into the following categories:

               (i) aset keuangan diukur pada biaya                             (i) financial   assets     measured    at
                    perolehan diamortisasi; dan                                     amortised cost; and
               (ii) aset keuangan diukur pada nilai wajar                      (ii) financial assets measured at fair
                    melalui laba rugi atau melalui                                  value either through profit or loss
                    penghasilan komprehensif lain.                                  (“FVTPL”)    or     through    other
                                                                                    comprehensive income (“FVOCI”).

               Klasifikasi ini tergantung pada model                           The classification depends on the
               bisnis Grup dan persyaratan kontraktual                         Group’s business model and the
               arus kas - apakah penentuan arus kasnya                         contractual terms of the cash flows when
               semata dari pembayaran pokok dan                                determining whether their cash flows are
               bunga.                                                          solely payments of principal and interest
                                                                               (“SPPI”).

               Grup menentukan klasifikasi          aset                       The Group determines the classification
               keuangan pada pengakuan awal.                                   of its financial assets at initial recognition.
Page 37
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                  Lampiran 5/25 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                      2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                       (continued)

     i.   Aset keuangan (lanjutan)                                    i.       Financial assets (continued)

          i.   Klasifikasi,     pengakuan                dan                   i.   Classification,  recognition               and
               pengukuran (lanjutan)                                                measurement (continued)

               (i).   Aset keuangan diukur pada biaya                               (i).    Financial assets       measured      at
                      perolehan diamortisasi                                                amortised cost

                      Klasifikasi    ini berlaku    untuk                                   This classification applies to debt
                      instrumen utang yang dikelola dalam                                   instruments which are held under a
                      model      bisnis  “dimiliki  untuk                                   “hold to collect” business model
                      mendapatkan arus kas” dan memiliki                                    and which have cash flows that
                      arus kas yang memenuhi kriteria                                       meet the SPPI criteria.
                      “semata-mata dari pembayaran
                      pokok dan bunga”.

                      Pada pengakuan awal, piutang                                          At      initial  recognition,     trade
                      usaha      yang      tidak    memiliki                                receivables that do not have a
                      komponen        pendanaan         yang                                significant financing component are
                      signifikan, diakui sebesar harga                                      recognised at their transaction
                      transaksi. Aset keuangan lainnya                                      price. Other financial assets are
                      awalnya diakui sebesar nilai wajar                                    initially recognised at fair value plus
                      dikurangi biaya transaksi yang                                        related transaction costs. They are
                      terkait.    Aset      keuangan       ini                              subsequently         measured         at
                      selanjutnya       diukur       sebesar                                amortised cost using the effective
                      biaya      perolehan       diamortisasi                               interest method. Any gains or
                      menggunakan metode suku bunga                                         losses        on   derecognition     or
                      efektif. Keuntungan atau kerugian                                     modification of a financial asset
                      pada penghentian atau modifikasi                                      held at amortised cost are
                      aset keuangan yang dicatat pada                                       recognised in profit or loss.
                      biaya perolehan diamortisasi diakui
                      pada laba rugi.

               (ii). Aset keuangan diukur pada nilai                                (ii).   Financial    assets    measured      at
                     wajar melalui laba rugi                                                FVTPL

                      Klasifikasi ini berlaku untuk aset                                    The classification applies to the
                      keuangan berikut. Dalam semua                                         following financial assets. In all
                      kasus, biaya transaksi dibebankan                                     cases, transaction costs are
                      pada laba rugi:                                                       immediately expensed in profit or
                                                                                            loss:

                      -   Instrumen utang yang tidak                                        -   Debt instruments that do not
                          memenuhi         kriteria   biaya                                     meet the criteria of amortised
                          perolehan diamortisasi atau nilai                                     cost or FVOCI. Subsequent fair
                          wajar      melalui     penghasilan                                    value gains or losses are
                          komprehensif lain. Keuntungan                                         recognised in profit or loss.
                          atau    kerugian      nilai wajar
                          selanjutnya akan dicatat pada
                          laba rugi.

                      -   Investasi ekuitas yang dimiliki                                   -   Equity investments that are held
                          untuk     diperdagangkan       atau                                   for trading or where FVOCI
                          dimana      pilihan   penghasilan                                     election has not been applied.
                          komprehensif lain tidak berlaku.                                      All fair value gains or losses and
                          Keuntungan atau kerugian nilai                                        related dividend income are
                          wajar dan penghasilan dividen                                         recognised in profit or loss.
                          terkait diakui pada laba rugi.
Page 38
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/26 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     i.   Aset keuangan (lanjutan)                                i.       Financial assets (continued)

          i.   Klasifikasi,     pengakuan            dan                   i.   Classification,  recognition               and
               pengukuran (lanjutan)                                            measurement (continued)

               (ii). Aset keuangan diukur pada nilai                            (ii).    Financial assets measured           at
                     wajar melalui laba rugi (lanjutan)                                  FVTPL (continued)

                   -   Derivatif yang bukan merupakan                                    -   Derivatives    that    are    not
                       instrumen       lindung   nilai.                                      designated as a hedging
                       Keuntungan atau kerugian nilai                                        instrument. All subsequent fair
                       wajar selanjutnya diakui pada                                         value gains or losses are
                       laba rugi.                                                            recognised in profit or loss.

                   -   Aset keuangan dengan derivatif                                    -   Financial assets with embedded
                       melekat dipertimbangkan secara                                        derivatives are considered in
                       keseluruhan saat menentukan                                           their entirety when determining
                       apakah arus kasnya semata-                                            whether their cash flows are
                       mata merupakan pembayaran                                             SPPI.
                       pokok dan bunga.

               (iii). Aset keuangan diukur pada nilai                           (iii).   Financial    assets    measured     at
                      wajar    melalui    penghasilan                                    FVOCI
                      komprehensif lain

                   Klasifikasi ini berlaku untuk aset                                    This classification applies to the
                   keuangan berikut ini:                                                 following financial assets:

                   -   Instrumen utang yang dikelola                                     -   Debt instruments that are held
                       dengan model bisnis yang                                              under a business model where
                       bertujuan untuk memiliki aset                                         they are held for collection of
                       keuangan      dalam       rangka                                      contractual cash flows and also
                       mendapatkan       arus       kas                                      for sale (“collect and sell”) and
                       kontraktual dan untuk dijual dan                                      which have cash flows that meet
                       di mana arus kasnya memenuhi                                          the SPPI criteria.
                       kriteria   “semata-mata      dari
                       pembayaran pokok dan bunga”.

                       Perubahan nilai wajar aset                                            All movements in the fair value
                       keuangan ini dicatat pada                                             of these financial assets are
                       penghasilan komprehensif lain,                                        taken         through         other
                       kecuali pengakuan keuntungan                                          comprehensive income, except
                       atau kerugian penurunan nilai,                                        for the recognition of impairment
                       pendapatan bunga (termasuk                                            gains or losses, interest revenue
                       biaya transaksi menggunakan                                           (including transaction costs by
                       metode suku bunga efektif),                                           applying the effective interest
                       keuntungan atau kerugian yang                                         method), gains or losses arising
                       timbul dari penghentian dan                                           on derecognition and foreign
                       keuntungan dan kerugian dari                                          exchange gains and losses that
                       selisih kurs diakui pada laba rugi.                                   are recognised in profit or loss.
                       Ketika aset keuangan dihentikan,                                      When the financial asset is
                       keuntungan atau kerugian nilai                                        derecognised, the cumulative
                       wajar kumulatif yang sebelumnya                                       fair value gains or losses
                       diakui      pada      penghasilan                                     previously recognised in other
                       komprehensif lain direklasifikasi                                     comprehensive income are
                       pada laba rugi.                                                       reclassified to profit or loss.
Page 39
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/27 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                     2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                      (continued)

     i.   Aset keuangan (lanjutan)                                   i.       Financial assets (continued)

          i.    Klasifikasi,     pengakuan              dan                   i.    Classification,  recognition              and
                pengukuran (lanjutan)                                               measurement (continued)

                (iii). Aset keuangan diukur pada nilai                              (iii).   Financial assets measured           at
                       wajar    melalui        penghasilan                                   FVOCI (continued)
                       komprehensif lain (lanjutan)

                     -   Investasi ekuitas di mana Grup                                      -   Equity investments where the
                         membuat         pilihan    yang                                         Group has irrevocably elected to
                         takterbatalkan untuk menyajikan                                         present fair value gains and
                         keuntungan dan kerugian nilai                                           losses on revaluation in other
                         wajar dari revaluasi pada                                               comprehensive income.
                         penghasilan komprehensif lain.

                         Pilihan ini dibuat berdasarkan                                          The election is made on an
                         instrumen per instrumen, namun,                                         instrument-by-instrument basis,
                         tidak berlaku pada investasi                                            however, it is not applicable to
                         ekuitas yang dimiliki untuk                                             equity investments held for
                         diperdagangkan.       Keuntungan                                        trading. Fair value gains or
                         atau kerugian nilai wajar dari                                          losses on the revaluation of such
                         revaluasi    investasi      ekuitas,                                    equity investments, including
                         termasuk komponen selisih kurs,                                         any        foreign       exchange
                         diakui     pada       penghasilan                                       component, are recognised in
                         komprehensif       lain.     Ketika                                     other comprehensive income.
                         investasi   ekuitas      dihentikan                                     When the equity investment is
                         pengakuannya, keuntungan atau                                           derecognised, there is no
                         kerugian    nilai    wajar    yang                                      reclassification of fair value
                         sebelumnya        diakui     dalam                                      gains or losses previously
                         penghasilan komprehensif lain                                           recognised          in       other
                         tidak direklasifikasi pada laba                                         comprehensive income to profit
                         rugi. Dividen diakui dalam laba                                         or     loss.     Dividends     are
                         rugi ketika hak untuk menerima                                          recognised in profit or loss when
                         pembayaran telah ditetapkan.                                            the right to receive payment is
                                                                                                 established.

                Grup mereklasifikasi investasi utang jika                           The Group reclassifies debt investments,
                dan hanya jika model bisnis untuk                                   if, and only if, the business model for
                mengelola aset tersebut berubah.                                    managing those assets changes.

                Lihat Catatan 2j untuk rincian kebijakan                            Refer to Note 2j for details of the Group’s
                akuntansi Grup atas instrumen keuangan                              accounting policy on derivative financial
                derivatif.                                                          instruments.

          ii.   Penghentian pengakuan                                         ii.   Derecognition

                Aset keuangan dihentikan pengakuannya                               Financial assets are derecognised when
                ketika hak untuk menerima arus kas dari                             the rights to receive cash flows from the
                investasi tersebut telah jatuh tempo atau                           investments have expired or have been
                telah ditransfer dan Grup telah                                     transferred and the Group has
                mentransfer secara substansial seluruh                              transferred substantially all of the risks
                risiko dan manfaat atas kepemilikan aset.                           and rewards of ownership.
Page 40
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/28 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     i.   Aset keuangan (lanjutan)                                i.       Financial assets (continued)

          iii. Penurunan nilai aset keuangan                               iii. Impairment of financial assets

              Grup menilai berdasarkan basis forward-                          The Group assesses on a forward-looking
              looking untuk mengukur kerugian kredit                           basis, the expected credit losses (“ECL”)
              ekspektasian terhadap aset keuangan                              associated with its financial assets carried
              yang diukur pada biaya perolehan                                 at amortised cost. The impairment
              diamortisasi. Metode penurunan nilai                             method applied depends on whether
              dilakukan dengan mempertimbangkan                                there has been a significant increase in
              apakah risiko kredit telah meningkat                             credit risk.
              secara signifikan.

              Pada setiap periode pelaporan, Grup                              At each reporting date, the Group
              menilai apakah risiko kredit dari                                assesses whether the credit risk on a
              instrumen keuangan telah meningkat                               financial instrument has increased
              secara signifikan sejak pengakuan awal.                          significantly since initial recognition.
              Ketika melakukan penilaian, Grup                                 When making the assessment, the Group
              menggunakan perubahan atas risiko                                uses the change in the risk of a default
              gagal bayar yang terjadi sepanjang                               occurring over the expected life of the
              perkiraan usia instrumen keuangan                                financial instrument instead of the change
              daripada perubahan atas jumlah kerugian                          in the amount of ECL. To make that
              kredit ekspektasian. Dalam melakukan                             assessment, the Group compares the risk
              penilaian, Grup membandingkan antara                             of a default occurring on the financial
              risiko gagal bayar yang terjadi atas                             instrument as at the reporting date with
              instrumen keuangan pada saat periode                             the risk of a default occurring on the
              pelaporan dengan risiko gagal bayar yang                         financial instrument as at the date of initial
              terjadi atas instrumen keuangan pada                             recognition and considers reasonable
              saat      pengakuan        awal      dan                         and supportable information, that is
              mempertimbangkan informasi yang wajar                            available without undue cost or effort at
              dan terdukung, yang tersedia tanpa biaya                         the reporting date about past events,
              atau upaya berlebihan pada saat tanggal                          current conditions and forecasts of future
              pelaporan terkait dengan kejadian masa                           economic conditions, that is indicative of
              lalu, kondisi terkini dan perkiraan atas                         significant increases in credit risk since
              kondisi ekonomi di masa depan, yang                              initial recognition.
              mengindikasikan kenaikan risiko kredit
              sejak pengakuan awal.

              Grup menerapkan pendekatan yang                                  The Group applies the “simplified
              disederhanakan         untuk      mengukur                       approach” to measuring ECL which uses
              kerugian kredit ekspektasian yang                                a lifetime expected loss allowance for all
              menggunakan cadangan kerugian kredit                             trade receivables, other receivables and
              ekspektasian seumur hidup untuk seluruh                          contract assets without significant
              saldo piutang usaha, piutang lain-lain dan                       financing components and the “general
              aset kontrak tanpa komponen pendanaan                            approach” for all other financial assets.
              yang signifikan dan pendekatan umum                              The general approach incorporates a
              untuk      aset      keuangan       lainnya.                     review for any significant increase in
              Pendekatan umum termasuk penelaahan                              counterparty credit risk since inception.
              perubahan signifikan risiko kredit sejak                         The ECL reviews include assumptions
              terjadinya. Penelaahan kerugian kredit                           about the risk of default and expected
              ekspektasian termasuk asumsi mengenai                            loss rates. For trade receivables, the
              risiko gagal bayar dan tingkat kerugian                          assessment considers the use of credit
              ekspektasian. Untuk piutang usaha,                               enhancements, for example, letters of
              dalam             pengkajian            juga                     credit and bank guarantees. To measure
              mempertimbangkan               penggunaan                        the ECL, trade receivables have been
              peningkatan kredit, misalnya, letter of                          grouped based on similar credit risk
              credit dan garansi bank. Untuk mengukur                          characteristics and the days past due.
              kerugian kredit ekspektasian, piutang
              usaha telah dikelompokkan berdasarkan
              karakteristik risiko kredit dan jatuh tempo
              yang serupa.
Page 41
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/29 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     i.   Aset keuangan (lanjutan)                                  i.       Financial assets (continued)

          iv. Saling   hapus         antar      instrumen                    iv. Offsetting financial instruments
              keuangan

              Aset dan liabilitas keuangan saling hapus                          Financial assets and liabilities are offset
              dan nilai netonya disajikan dalam laporan                          and their net amounts are reported
              posisi keuangan konsolidasian interim                              in the interim consolidated statements of
              jika terdapat hak yang dapat dipaksakan                            financial position when there is a legally
              secara hukum untuk melakukan saling                                enforceable right to offset the recognised
              hapus atas jumlah yang telah diakui                                amounts and there is an intention to settle
              tersebut dan terdapat maksud untuk                                 on a net basis or realise the asset and
              menyelesaikan secara neto atau untuk                               settle the liability simultaneously.
              merealisasikan aset dan menyelesaikan
              liabilitas secara bersamaan.

     j.   Instrumen keuangan derivatif dan aktivitas                j.       Derivative financial       instruments     and
          lindung nilai                                                      hedging activities

          Instrumen keuangan derivatif pada awalnya                          Derivative financial instruments are initially
          diakui sebesar nilai wajar tanggal kontrak                         recognised at fair value on the date on which
          derivatif dimulai dan selanjutnya dinilai                          a derivative contract is entered into and are
          kembali sebesar nilai wajarnya. Metode                             subsequently remeasured at their fair values.
          pengakuan keuntungan atau kerugian yang                            The method of recognising the resulting gain
          terjadi tergantung apakah derivatif tersebut                       or loss depends on whether the derivative is
          merupakan instrumen lindung nilai dan jika                         designated as a hedging instrument and, if so,
          demikian sifat objek yang dilindungi nilainya.                     on the nature of the item being hedged. The
          Grup mengelompokkan derivatif tertentu                             Group designates certain derivatives as either
          sebagai (a) lindung nilai atas nilai wajar aset                    (a) hedges of the fair value of recognised
          atau liabilitas yang diakui atau komitmen pasti                    assets or liabilities or a firm commitment (fair
          yang belum diakui (lindung nilai wajar); atau                      value hedge); or (b) hedges of a particular risk
          (b) lindung nilai risiko tertentu yang terkait                     associated with a recognised asset or liability
          dengan aset atau liabilitas atau transaksi yang                    or a highly probable forecast transaction (cash
          diperkirakan kemungkinan besar terjadi                             flow hedge).
          (lindung nilai arus kas).

          Pada saat terjadinya transaksi, Grup                               At the inception of the transaction, the Group
          mendokumentasi hubungan antara instrumen                           documents the relationship between hedging
          lindung nilai dan item yang dilindung nilai, juga                  instruments and hedging items, as well as its
          tujuan manajemen risiko dan strategi yang                          risk management objectives and the strategy
          diterapkan dalam melakukan berbagai macam                          for undertaking hedging transactions. The
          transaksi     lindung    nilai.    Grup       juga                 Group also documents its assessment, both at
          mendokumentasikan penilaiannya, pada saat                          the hedge inception and on an ongoing basis,
          terjadinya dan secara berkesinambungan,                            of whether the derivatives used in hedging
          apakah derivatif yang digunakan untuk                              transactions are highly effective in offsetting
          transaksi lindung nilai memiliki efektivitas yang                  changes in the fair value of or the cash flow
          tinggi dalam rangka saling hapus perubahan                         from hedged items.
          nilai wajar atau arus kas item yang dilindung
          nilai.

          Nilai     penuh     derivatif   lindung     nilai                  The full value of a hedging derivative is
          dikelompokkan sebagai aset tidak lancar atau                       classified as a non-current asset or liability
          liabilitas jangka panjang apabila jatuh tempo                      when the remaining maturity of the hedged
          item yang dilindung nilai tersebut melebihi                        item is more than 12 months and as a current
          12 bulan dan sebagai aset lancar atau liabilitas                   asset or liability when the remaining maturity
          jangka pendek apabila jatuh tempo item                             of the hedged item is less than 12 months
          lindung nilai tersebut kurang dari 12 bulan dari                   from the reporting date.
          tanggal pelaporan.
Page 42
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/30 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                      2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                       (continued)

     j.   Instrumen keuangan derivatif dan aktivitas                  j.        Derivative financial instruments             and
          lindung nilai (lanjutan)                                              hedging activities (continued)

          i.    Lindung nilai atas nilai wajar                                  i.    Fair value hedge

                Perubahan nilai wajar derivatif yang                                  Changes in the fair values of derivatives
                ditetapkan dan memenuhi kriteria sebagai                              that are designated and qualify as fair
                lindung nilai atas nilai wajar, dicatat dalam                         value hedges are recognised in profit or
                laba rugi, bersamaan dengan perubahan                                 loss, together with any changes in the fair
                yang terjadi pada nilai wajar aset atau                               value of the hedged asset or liability that
                liabilitas lindung nilai terkait dengan risiko                        are attributable to the hedged risk. The
                lindung nilai. Keuntungan atau kerugian                               gain or loss relating to the effective
                yang terkait dengan bagian efektif lindung                            portion of such a fair value hedge is
                nilai atas nilai wajar diakui dalam laba                              recognised in profit or loss in the same
                rugi, di baris yang sama dengan                                       line as the changes in fair value of the
                perubahan nilai wajar item lindung nilai.                             hedged item to which it relates. The gain
                Keuntungan atau kerugian yang terkait                                 or loss relating to the ineffective portion
                dengan bagian yang tidak efektif diakui                               is recognised immediately in profit or
                dalam laba rugi.                                                      loss.

          ii.   Lindung nilai arus kas                                          ii.   Cash flow hedge

                Bagian efektif perubahan nilai wajar                                  The effective portion of changes in the
                derivatif yang ditetapkan dan memenuhi                                fair value of derivatives that are
                kriteria sebagai lindung nilai arus kas,                              designated and qualify as cash flow
                diakui dalam penghasilan komprehensif                                 hedges is recognised in other
                lain. Keuntungan atau kerugian yang                                   comprehensive income. The gain or loss
                terkait bagian yang tidak efektif diakui                              relating to the ineffective portion is
                dalam laba rugi.                                                      recognised immediately in profit or loss.

                Jumlah yang diakumulasikan dalam                                      Amounts       accumulated        in    other
                penghasilan komprehensif lain di ekuitas                              comprehensive income within equity are
                direklasifikasi ke laba rugi pada saat item                           reclassified to profit or loss in the period
                lindung nilai mempengaruhi laba rugi.                                 when the hedged item affects profit or
                Keuntungan atau kerugian terkait bagian                               loss. The gain or loss relating to the
                efektif lindung nilai arus kas diakui dalam                           effective portion of the cash flow hedge
                laba rugi, di baris yang sama dengan item                             is recognised in profit or loss in the same
                lindung nilai. Akan tetapi, ketika proyeksi                           line as the hedged item to which it
                transaksi       yang      dilindung     nilai                         relates. However, when the forecast
                menimbulkan         aset       non-keuangan                           transaction that is being hedged results
                (contohnya persediaan atau aset tetap),                               in the recognition of a non-financial asset
                keuntungan        dan     kerugian     yang                           (for example, inventory or fixed assets),
                sebelumnya ditangguhkan di ekuitas                                    the gains and losses previously deferred
                akan dialihkan dari ekuitas dan                                       in equity are transferred from equity and
                dimasukkan di dalam pengukuran awal                                   included in the initial measurement of the
                harga perolehan aset tersebut. Jumlah                                 cost of the asset. The deferred amounts
                yang ditangguhkan pada akhirnya diakui                                are ultimately recognised in the cost of
                dalam akun beban pokok pendapatan                                     revenue in the case of inventory or in
                apabila terkait dengan persediaan atau                                depreciation expense in the case of fixed
                dalam akun beban penyusutan apabila                                   assets.
                terkait dengan aset tetap.

                Ketika instrumen lindung nilai kadaluarsa                             When a hedging instrument expires or is
                atau dijual, atau ketika lindung nilai tidak                          sold, or when a hedge no longer meets
                lagi memenuhi kriteria akuntansi lindung                              the criteria for hedge accounting, any
                nilai, keuntungan atau kerugian kumulatif                             cumulative gain or loss existing in equity
                yang ada di ekuitas saat itu tetap berada                             at that time remains in equity and is
                di bagian ekuitas dan diakui pada saat                                recognised      when        the   forecast
                prakiraan transaksi terjadi dalam laba                                transaction is ultimately recognised in
                rugi. Apabila prakiraan transaksi tidak lagi                          profit or loss. When a forecast
                diharapkan akan terjadi, keuntungan atau                              transaction is no longer expected to
                kerugian kumulatif yang telah dicatat di                              occur, the cumulative gain or loss that
                bagian ekuitas segera dialihkan dalam                                 was reported in equity is immediately
                laba rugi.                                                            transferred to profit or loss.
Page 43
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/31 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.    MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     j.   Instrumen keuangan derivatif dan aktivitas              j.       Derivative financial instruments           and
          lindung nilai (lanjutan)                                         hedging activities (continued)

          Perubahan nilai wajar dari derivatif yang tidak                  Changes in the fair value of any derivative
          ditetapkan, atau tidak memenuhi kriteria                         instruments that are not designated as, or do
          untuk, akuntansi lindung nilai diakui secara                     not qualify for, hedge accounting are
          langsung dalam laba rugi.                                        recognised immediately in profit or loss.

     k.   Aset tetap                                              k.       Fixed assets

          Grup menganalisis fakta dan keadaan untuk                        The Group analyses the facts and
          masing-masing jenis hak atas tanah dalam                         circumstances for each type of land rights in
          menentukan akuntansi untuk masing-masing                         determining the accounting for each of its land
          hak atas tanah tersebut sehingga dapat                           rights so that it accurately represents an
          merepresentasikan dengan tepat suatu                             underlying economic event or transaction. If
          kejadian atau transaksi ekonomis yang                            the land rights do not transfer control of the
          mendasarinya. Jika hak atas tanah tersebut                       underlying assets to the Group, but give the
          tidak mengalihkan pengendalian atas aset                         rights to use the underlying assets, the Group
          pendasar    kepada       Grup,  melainkan                        applies the accounting treatment for leases
          mengalihkan hak untuk menggunakan aset                           under SFAS No. 116, “Leases”. If the land
          pendasar, Grup menerapkan perlakuan                              rights are substantially similar to land
          akuntansi atas transaksi tersebut sebagai                        purchases, the Group applies SFAS No. 216,
          sewa berdasarkan PSAK No. 116, “Sewa”.                           “Property, plant and equipment” under which
          Jika hak atas tanah secara substansi                             land rights are recognised at cost and not
          menyerupai pembelian tanah, maka Grup                            depreciated.
          menerapkan PSAK No. 216, “Aset tetap” yaitu
          hak atas tanah diakui sebesar harga
          perolehan dan tidak disusutkan.

          Pada awalnya, semua aset tetap diakui                            Fixed assets are initially recognised at cost
          sebesar harga perolehan dan setelahnya                           and subsequently carried at cost less
          dicatat sebesar harga perolehan dikurangi                        accumulated depreciation and accumulated
          akumulasi penyusutan dan akumulasi                               impairment losses. Fixed assets, except for
          kerugian penurunan nilai. Aset tetap, kecuali                    the fixed assets of AI, LSA, SCM, MIP, PCS,
          aset tetap AI, LSA, SCM, MIP, PCS entitas-                       the AMC entities, PC and RC, are depreciated
          entitas AMC, PC dan RC, disusutkan hingga                        using the straight-line method to their residual
          mencapai estimasi nilai sisa menggunakan                         values over their estimated useful lives as
          metode garis lurus selama estimasi masa                          follows:
          manfaatnya sebagai berikut:

                                                     Tahun/Years

          Bangunan                                      10 - 30                                                 Buildings
          Infrastruktur                                  4 - 30                                            Infrastructure
          Pembangkit listrik                               25                                              Power plants
          Mesin, peralatan operasional,                                              Machineries, operational equipment
            dan kendaraan                               4 - 30                                           and vehicles
          Kapal                                         5 - 25                                                   Vessels
          Peralatan kantor                               2-8                                           Office equipment
          Jalan dan jembatan                            10 - 20                                      Roads and bridges
Page 44
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/32 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    2.     MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                       (continued)

     k.   Aset tetap (lanjutan)                                       k.   Fixed assets (continued)

          Aset tetap AI, LSA, SCM, MIP, PCS, entitas-                      The fixed assets of AI, LSA, SCM, MIP, PCS,
          entitas AMC, PC dan RC disusutkan                                the AMC entities, PC and RC are depreciated
          menggunakan metode garis lurus selama                            using the straight-line method over the lesser
          periode yang lebih rendah antara estimasi                        of the estimated useful lives of the assets, the
          masa manfaat aset, umur tambang, atau masa                       life of the mine, or the term of the relevant
          jangka waktu lisensi atau kontrak yang                           licence or contract, as follows:
          relevan, sebagai berikut:

                                                      Tahun/Years

          Bangunan                                           3 - 20                                             Buildings
          Infrastruktur                                      3 - 20                                        Infrastructure
          Mesin, peralatan operasional,                                              Machineries, operational equipment
             dan kendaraan                                   2 - 25                                      and vehicles
          Peralatan kantor                                   2 - 10                                    Office equipment
          Fasilitas peremukan dan pengolahan                 2 - 30                     Crushing and handling facilities
          Jalan dan jembatan                                 2 - 30                                  Roads and bridges

          Biaya-biaya yang terjadi setelah pengakuan                       Subsequent costs are included in the asset’s
          awal diakui sebagai bagian nilai tercatat aset                   carrying amount or recognised as a separate
          atau sebagai aset terpisah, sebagaimana                          asset, as appropriate, only when it is probable
          mestinya, hanya jika kemungkinan besar Grup                      that future economic benefits associated with
          akan mendapatkan manfaat ekonomis di                             the item will flow to the Group and the cost of
          masa depan berkenaan dengan aset tersebut                        the item can be measured reliably. The
          dan biaya perolehan aset dapat diukur dengan                     carrying amounts of the replaced parts are
          andal. Nilai tercatat komponen yang                              derecognised. All other repairs and
          digantikan dihapuskan. Biaya perbaikan dan                       maintenance are charged to profit or loss
          pemeliharaan dibebankan dalam laba rugi                          during the financial year in which they are
          dalam tahun buku ketika biaya-biaya tersebut                     incurred.
          terjadi.

          Masa manfaat, nilai sisa, dan metode                             The useful lives, residual values and
          penyusutan aset tetap ditelaah, jika                             depreciation methods of fixed assets are
          diperlukan, setidaknya disesuaikan, pada                         reviewed and adjusted if appropriate, at the
          setiap akhir tahun buku. Dampak dari setiap                      end of each financial year. The effects of any
          revisi diakui dalam laba rugi ketika perubahan                   revisions are recognised in profit or loss when
          terjadi.                                                         the changes arise.

          Nilai tercatat aset segera diturunkan sebesar                    An asset’s carrying amount is written down
          jumlah yang dapat dipulihkan apabila nilai                       immediately to its recoverable amount if the
          tercatat aset lebih besar daripada estimasi                      asset’s carrying amount is greater than its
          jumlah yang dapat dipulihkan (Catatan 2m).                       estimated recoverable amount (Note 2m).

          Nilai tercatat aset tetap yang tidak digunakan                   For assets which are no longer utilised or sold
          lagi atau dijual atau diserahkan pada                            or surrendered to the Government, the
          Pemerintah,      dikeluarkan     dari    laporan                 carrying amounts are eliminated from the
          keuangan       konsolidasian     interim,    dan                 interim consolidated financial statements and
          keuntungan atau kerugian yang timbul akibat                      the resulting gains or losses on disposals of
          pelepasan aset tetap tersebut diakui dalam                       fixed assets are recognised in profit or loss.
          laba rugi.

          Akumulasi biaya konstruksi bangunan, jalan                       The accumulated costs of the construction of
          dan     jembatan,   infrastruktur, fasilitas                     buildings, roads and bridges, infrastructure,
          peremukan dan pengolahan dan pemasangan                          crushing and handling facilities and the
          mesin dikapitalisasi sebagai aset dalam                          installation of machineries are capitalised as
          pembangunan. Biaya tersebut direklasifikasi                      construction in progress. These costs are
          ke akun aset tetap pada saat proses                              reclassified to the fixed asset accounts when
          konstruksi   atau   pemasangan     selesai.                      the construction or installation is complete.
          Penyusutan dimulai pada saat aset tersebut                       Depreciation is charged from the date on
          siap untuk digunakan sesuai dengan tujuan                        which the assets are ready for use in the
          yang diinginkan manajemen.                                       manner intended by management.
Page 45
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/33 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     l.   Goodwill                                                 l.       Goodwill

          Goodwill timbul dari akuisisi entitas anak dan                    Goodwill arises from the acquisition of
          merupakan selisih imbalan yang ditransfer                         subsidiaries and represents the excess of the
          terhadap kepemilikan dalam nilai wajar neto                       consideration transferred over the interest in
          atas aset, liabilitas, dan liabilitas kontinjensi                 the net fair value of the net identifiable assets,
          teridentifikasi dan nilai wajar kepentingan                       liabilities and contingent liabilities of the
          non-pengendali pada pihak diakuisisi.                             acquiree and the fair value of the non-
                                                                            controlling interest in the acquiree.

          Untuk pengujian penurunan nilai, goodwill                         For the purposes of impairment testing,
          yang diperoleh dalam kombinasi bisnis                             goodwill acquired in a business combination is
          dialokasikan pada setiap Unit Penghasil Kas                       allocated to each Cash-Generating Unit
          (“UPK”), atau kelompok UPK, yang                                  (“CGU”), or group of CGUs, which is expected
          diharapkan dapat memberikan manfaat dari                          to benefit from the synergies of the
          sinergi kombinasi bisnis tersebut. Setiap unit                    combination. Each CGU or group of CGUs to
          atau kelompok unit yang memperoleh alokasi                        which the goodwill is allocated represents the
          goodwill merepresentasikan level terendah                         lowest level within the entity at which goodwill
          dalam entitas yang goodwill-nya dipantau                          is monitored for internal management
          untuk tujuan manajemen internal. Goodwill                         purposes. Goodwill is monitored at the
          dipantau pada level segmen operasi.                               operating segment level.

     m.   Penurunan nilai dari aset non-keuangan                   m.       Impairment of non-financial assets

          Aset yang memiliki umur manfaat tidak                             Assets that have an indefinite useful life, for
          terbatas, misalnya goodwill atau aset                             example, goodwill or intangible assets not
          takberwujud yang belum siap digunakan, tidak                      ready to use, are not subject to amortisation
          diamortisasi namun diuji penurunan nilainya                       but tested annually for impairment, or more
          setiap tahun, atau lebih sering jika terdapat                     frequently if events or changes in
          kejadian atau perubahan keadaan yang                              circumstances indicate that the carrying
          mengindikasikan bahwa nilai tercatatnya                           amount may not be recoverable. Assets that
          mungkin tidak dapat dipulihkan. Aset yang                         have a definite useful life are subject to
          memiliki umur manfaat terbatas, diamortisasi                      amortisation or depreciation, and are
          atau disusutkan, dan diuji untuk penurunan                        reviewed for impairment whenever events or
          nilai jika terdapat kejadian atau perubahaan                      changes in circumstances indicate that the
          keadaan yang mengindikasikan bahwa nilai                          carrying amount may not be recoverable. An
          tercatatnya mungkin tidak dapat dipulihkan.                       impairment loss is recognised at the amount
          Penurunan nilai diakui jika nilai tercatat aset                   by which the asset’s carrying amount exceeds
          melebihi jumlah terpulihkannya. Jumlah                            its recoverable amount. The recoverable
          terpulihkan merupakan jumlah yang lebih                           amount is the higher of an asset’s fair value
          tinggi antara nilai wajar aset dikurangi biaya                    less costs of disposal and its value in use. For
          untuk menjual dan nilai pakai aset. Dalam                         the purposes of assessing impairment, assets
          menentukan        penurunan      nilai,     aset                  are grouped at the lowest level for which there
          dikelompokkan pada level yang paling rendah                       is separately identifiable cash flows. Non-
          dimana terdapat arus kas yang dapat                               financial assets other than goodwill that suffer
          diidentifikasi. Aset non-keuangan selain                          impairment are reviewed for possible reversal
          goodwill yang mengalami penurunan nilai diuji                     of the impairment at each reporting date.
          untuk      menentukan      apakah       terdapat
          kemungkinan pemulihan penurunan nilai,
          pada setiap tanggal pelaporan.

          Pembalikan rugi penurunan nilai, untuk aset                       Reversal of impairment losses for assets other
          selain goodwill, diakui jika, dan hanya jika,                     than goodwill is recognised if, and only if,
          terdapat perubahan estimasi yang digunakan                        there has been a change in the estimates
          dalam menentukan jumlah terpulihkan aset                          used to determine the asset’s recoverable
          sejak pengujian penurunan nilai terakhir kali.                    amount since the last impairment testing was
          Pembalikan rugi penurunan nilai tersebut                          carried out. The reversal of impairment losses
          diakui segera dalam laba rugi. Pembalikan                         will be recognised immediately in profit or loss.
          tersebut tidak boleh mengakibatkan nilai                          The reversal should not result in the carrying
          tercatat aset melebihi biaya perolehan                            amount of an asset exceeding what the
          disusutkan sebelum adanya pengakuan                               depreciated cost would have been had the
          penurunan nilai pada tanggal pembalikan                           impairment not been recognised at the date
          dilakukan. Rugi penurunan nilai atas goodwill                     on which the impairment was reversed.
          tidak dibalik lagi.                                               Impairment losses relating to goodwill will not
                                                                            be reversed.
Page 46
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/34 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     n.   Aset eksplorasi dan evaluasi                            n.    Exploration and evaluation assets

          Aktivitas eksplorasi dan evaluasi meliputi                    Exploration and evaluation activity involves
          mencari sumber daya mineral setelah Grup                      searching for mineral resources after the
          memperoleh        hak     hukum       untuk                   Group has obtained legal rights to explore in a
          mengeksplorasi suatu wilayah tertentu,                        specific area, determining the technical
          menentukan kelayakan teknis dan menilai                       feasibility and assessing the commercial
          komersial atas sumber daya mineral spesifik.                  viability of an identified resource.

          Pengeluaran    eksplorasi  dan   evaluasi                     Exploration and evaluation expenditure
          termasuk biaya yang berhubungan langsung                      includes costs that are directly attributable to:
          dengan:

          -     perolehan hak untuk eksplorasi;                         -     acquisition of rights to explore;
          -     kajian topografi, geologi, geokimia, dan                -     topographical, geological, geochemical
                geofisika;                                                    and geophysical studies;
          -     pengeboran eksplorasi;                                  -     exploratory drilling;
          -     pemaritan dan pengambilan contoh; dan                   -     trenching and sampling; and
          -     aktivitas yang terkait dengan evaluasi                  -     activities involved in evaluating the
                kelayakan teknis dan komersial atas                           technical feasibility and commercial
                penambangan sumber daya mineral.                              viability of extracting mineral resources.

          Biaya eksplorasi dan evaluasi yang                            Exploration and evaluation expenditure
          berhubungan dengan suatu area of interest                     related to an area of interest is written off as
          dibebankan pada saat terjadinya kecuali biaya                 incurred, unless it is capitalised and carried
          tersebut dikapitalisasi dan ditangguhkan,                     forward, on an area of interest basis, provided
          berdasarkan area of interest, apabila                         that one of the following conditions is met:
          memenuhi salah satu dari ketentuan berikut
          ini:

          (i)   terdapat hak untuk mengeksplorasi dan                   (i)   the tenure rights of an area are current
                mengevaluasi suatu area dan biaya                             and it is considered probable that the
                tersebut diharapkan dapat diperoleh                           costs will be recouped through the
                kembali        melalui        keberhasilan                    successful development and exploitation
                pengembangan dan eksploitasi di area of                       of the area of interest or, alternatively,
                interest tersebut atau melalui penjualan                      through its sale; or
                atas area of interest tersebut; atau

          (ii) kegiatan eksplorasi dalam area of interest               (ii) exploration activities in the area of
               tersebut belum mencapai tahap yang                            interest have not yet reached a stage that
               memungkinkan       penentuan      adanya                      permits a reasonable assessment of the
               cadangan terbukti yang secara ekonomis                        existence or otherwise of economically
               dapat diperoleh, serta kegiatan yang aktif                    recoverable reserves and active and
               dan signifikan dalam atau berhubungan                         significant operations in or in relation to
               dengan area of interest tersebut masih                        the area of interest are ongoing.
               berlanjut.

          Biaya yang dikapitalisasi mencakup biaya-                     Capitalised costs include costs directly related
          biaya yang berkaitan langsung dengan                          to exploration and evaluation activities in the
          aktivitas eksplorasi dan evaluasi pada area of                relevant area of interest, and exclude physical
          interest yang relevan, tidak termasuk aset                    assets which are recorded in fixed assets.
          berwujud yang dicatat sebagai aset tetap.                     General and administrative costs are
          Biaya umum dan administrasi dialokasikan                      allocated to exploration or evaluation assets
          sebagai aset eksplorasi atau evaluasi hanya                   only to the extent that those costs can be
          jika biaya tersebut berkaitan langsung dengan                 related directly to operational activities in the
          aktivitas operasional pada area of interest                   relevant area of interest.
          yang relevan.

          Pengeluaran eksplorasi dan evaluasi yang                      Capitalised exploration and evaluation
          dikapitalisasi dihapusbukukan ketika kondisi                  expenditure is written off where the above
          tersebut di atas tidak lagi terpenuhi.                        conditions are no longer satisfied.
Page 47
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/35 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     n.   Aset eksplorasi dan evaluasi (lanjutan)                n.   Exploration      and      evaluation      assets
                                                                      (continued)

          Aset eksplorasi dan evaluasi teridentifikasi                Identifiable exploration and evaluation assets
          yang diperoleh dalam suatu kombinasi bisnis                 acquired in a business combination are
          pada awalnya diakui sebagai aset pada nilai                 recognised initially as assets at fair value upon
          wajar pada saat akuisisi dan selanjutnya                    acquisition, and subsequently at cost less
          diukur pada biaya perolehan dikurangi                       impairment      charges.     Exploration      and
          kerugian penurunan nilai. Pengeluaran                       evaluation expenditure incurred subsequent
          eksplorasi dan evaluasi yang terjadi setelah                to the acquisition of an exploration asset in a
          perolehan aset eksplorasi dalam suatu                       business combination is accounted for in
          kombinasi bisnis dicatat dengan mengacu                     accordance with the policy outlined above.
          pada kebijakan akuntansi di atas.

          Oleh karena aset eksplorasi dan evaluasi tidak              As the exploration and evaluation assets are
          tersedia untuk digunakan, maka aset tersebut                not available for use, they are not depreciated.
          tidak disusutkan.

          Aset eksplorasi dan evaluasi diuji penurunan                Exploration and evaluation assets are
          nilainya   ketika    fakta    dan     kondisi               assessed for impairment if facts and
          mengindikasikan adanya penurunan nilai.                     circumstances indicate that impairment may
          Aset eksplorasi dan evaluasi juga diuji                     exist. Exploration and evaluation assets are
          penurunan nilainya ketika terjadi penemuan                  also tested for impairment once commercial
          cadangan komersial, sebelum aset tersebut                   reserves are found, before the assets are
          ditransfer ke “properti pertambangan -                      transferred to “mining properties - mines
          tambang dalam pengembangan”.                                under development”.

          Pengeluaran yang terjadi sebelum entitas                    Expenditure incurred before the entity
          memperoleh       hak       hukum    untuk                   obtained the legal right to explore a specific
          mengeksplorasi    suatu      area spesifik                  area is expensed as incurred.
          dibiayakan pada saat terjadinya.

     o.   Properti pertambangan                                  o.   Mining properties

          Biaya pengembangan yang dikeluarkan oleh                    Development expenditure incurred by or on
          atau atas nama Grup diakumulasikan secara                   behalf of the Group is accumulated separately
          terpisah untuk setiap area of interest pada                 for each area of interest in which economically
          saat cadangan terpulihkan yang secara                       recoverable resources have been identified.
          ekonomis dapat diidentifikasi. Biaya tersebut               Such expenditure includes costs directly
          termasuk biaya yang dapat diatribusikan                     attributable to the construction of mines and
          secara langsung pada konstruksi tambang                     related infrastructure and excludes physical
          dan infrastruktur terkait, tidak termasuk biaya             assets and land rights (i.e. right to build, right
          aset berwujud dan hak atas tanah (seperti hak               to cultivate and right to use), which are
          guna bangunan, hak guna usaha, dan hak                      recorded as fixed assets.
          pakai) yang dicatat sebagai aset tetap.

          Ketika keputusan pengembangan telah                         Once a development decision has been
          diambil, jumlah tercatat aset eksplorasi dan                taken, the carrying amount of the exploration
          evaluasi pada area of interest tertentu                     and evaluation assets in respect of the area of
          dipindahkan sebagai “tambang dalam                          interest is transferred to “mines under
          pengembangan”       pada     akun    properti               development” within mining properties and
          pertambangan      dan    digabung    dengan                 aggregated with the subsequent development
          pengeluaran       biaya       pengembangan                  expenditure.
          selanjutnya.

          “Tambang          dalam      pengembangan”                  “Mines under development” are reclassified
          direklasifikasi ke “tambang yang berproduksi”               as “mines in production” within mining
          pada akun properti pertambangan pada akhir                  properties at the end of the commissioning
          tahap komisioning, ketika tambang tersebut                  phase, when the mine is capable of operating
          dapat beroperasi sesuai dengan maksud                       in the manner intended by management.
          manajemen.
Page 48
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/36 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                           30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     o.   Properti pertambangan (lanjutan)                      o.    Mining properties (continued)

          “Tambang dalam pengembangan” tidak                          No amortisation is recognised for “mines under
          diamortisasi sampai direklasifikasi menjadi                 development” until they are reclassified as
          “tambang yang berproduksi”.                                 “mines in production”.

          Ketika timbul biaya pengembangan lebih                      When further development expenditure is
          lanjut atas properti pertambangan setelah                   incurred on a mining property after the
          dimulainya produksi, maka biaya tersebut                    commencement of production, the expenditure
          akan dicatat sebagai bagian dari “tambang                   is carried forward as part of “mines in
          yang     berproduksi”    apabila   terdapat                 production” when it is probable that additional
          kemungkinan besar tambahan manfaat                          future economic benefits associated with the
          ekonomi masa depan sehubungan dengan                        expenditure will flow to the Group. Otherwise,
          biaya tersebut akan mengalir ke Grup.                       such expenditure is classified as a cost of
          Apabila tidak, biaya tersebut dibebankan                    production.
          sebagai biaya produksi.

          “Tambang yang berproduksi” (termasuk biaya                  “Mines in production” (including reclassified
          eksplorasi, evaluasi dan pengembangan,                      exploration, evaluation and any development
          serta pembayaran untuk memperoleh hak                       expenditure, and payments to acquire mineral
          penambangan dan sewa) diamortisasi                          rights and leases) are amortised using the
          dengan menggunakan metode unit produksi,                    units-of-production method, with separate
          dengan perhitungan terpisah yang dibuat                     calculations being made for each area of
          untuk setiap area of interest. “Tambang yang                interest. “Mines in production” will be depleted
          berproduksi” dideplesi menggunakan metode                   using the units-of-production method on the
          unit produksi berdasarkan cadangan terbukti                 basis of proven and probable reserves.
          dan cadangan terduga.

          Properti pertambangan teridentifikasi yang                  Identifiable mining properties acquired in a
          diperoleh melalui suatu kombinasi bisnis pada               business combination are initially recognised
          awalnya diakui sebagai aset sebesar nilai                   as assets at their fair value. Development
          wajarnya. Pengeluaran pengembangan yang                     expenses incurred subsequent to the
          terjadi setelah akuisisi properti pertambangan              acquisition of the mining properties are
          dicatat berdasarkan kebijakan akuntansi yang                accounted for in accordance with the policy
          dijelaskan di atas.                                         outlined above.

          “Tambang dalam pengembangan” dan                            “Mines under development” and “mines in
          “tambang yang berproduksi” diuji penurunan                  production” are tested for impairment in
          nilainya dengan mengacu pada kebijakan                      accordance with the policy described in
          akuntansi pada Catatan 2m.                                  Note 2m.

     p.   Biaya pengupasan tanah                                p.    Stripping costs

          Biaya pengupasan lapisan tanah merupakan                    Stripping costs are the costs of removing
          biaya yang dikeluarkan untuk membuang                       overburden from a mine. Stripping costs
          tanah penutup suatu tambang. Biaya                          incurred in the development of a mine before
          pengupasan lapisan tanah yang terjadi pada                  production commences are capitalised as part
          tahap pengembangan tambang sebelum                          of the cost of developing the mine and are
          dimulainya produksi diakui sebagai biaya                    subsequently depleted using the units-of-
          pengembangan tambang dan akan dideplesi                     production method on the basis of proven and
          menggunakan     metode     unit    produksi                 probable reserves.
          berdasarkan cadangan terbukti dan cadangan
          terduga.

          Aktivitas pengupasan lapisan tanah yang                     Stripping activity conducted during the
          terjadi selama tahap produksi mungkin                       production phase may provide two benefits
          memiliki dua manfaat untuk kepentingan                      that accrue to the Group: (i) coal that is
          Grup: (i) batubara yang dapat diproses untuk                processed into inventory in the current year;
          menjadi persediaan dalam tahun berjalan; dan                and (ii) improved access to the coal body in
          (ii) peningkatan akses ke badan batubara di                 future periods.
          periode berikutnya.
Page 49
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/37 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                          30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL               2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                (continued)

     p.   Biaya pengupasan tanah (lanjutan)                    p.    Stripping costs (continued)

          Sepanjang manfaat dari aktivitas pengupasan                To the extent that the benefit from the
          lapisan tanah dapat direalisasikan dalam                   stripping activity is realised in the form of
          bentuk persediaan yang diproduksi dalam                    inventory produced, the Group accounts for
          periode tersebut, Grup mencatat biaya atas                 the costs of this stripping activity in
          aktivitas pengupasan lapisan tanah sesuai                  accordance with the principles of SFAS No.
          dengan prinsip PSAK No. 202, “Persediaan”.                 202, “Inventories”. To the extent the benefit is
          Sepanjang biaya pengupasan lapisan tanah                   improved access to the coal body, the Group
          memberikan manfaat peningkatan akses                       recognises these costs as a stripping activity
          menuju badan batubara di periode yang akan                 asset if, and only if, all of the following criteria
          datang, Grup mencatat biaya tersebut sebagai               are met:
          aset aktivitas pengupasan lapisan tanah, jika
          dan hanya jika, memenuhi kriteria berikut:

          1.   Besar kemungkinan bahwa manfaat                       1.   It is probable that the future economic
               ekonomik masa depan (peningkatan                           benefit (improved access to the coal
               akses menuju badan batubara) yang                          body) associated with the stripping
               terkait dengan aktivitas pengupasan                        activity will flow to the Group;
               lapisan tanah akan mengalir kepada
               Grup;
          2.   Grup dapat mengidentifikasi komponen                  2.   The Group can identify the component of
               badan batubara yang aksesnya telah                         the coal body for which access has been
               ditingkatkan; dan                                          improved; and
          3.   Biaya aktivitas pengupasan lapisan tanah              3.   The costs relating to the stripping activity
               yang terkait dengan komponen tersebut                      associated with that component can be
               dapat diukur secara andal.                                 measured reliably.

          Aset aktivitas pengupasan lapisan tanah pada               A stripping activity asset is initially measured
          awalnya diukur pada biaya perolehan, yang                  at cost, which represents the accumulation of
          merupakan akumulasi dari biaya-biaya yang                  costs directly incurred to perform stripping
          secara langsung terjadi untuk melakukan                    activity that improves access to the identified
          aktivitas pengupasan lapisan tanah yang                    component of the coal body, plus an allocation
          meningkatkan akses terhadap komponen                       of directly attributable overhead costs. If
          badan batubara yang teridentifikasi, ditambah              incidental operations are occurring at the
          alokasi biaya overhead          yang dapat                 same time as the production stripping activity,
          diatribusikan secara langsung. Jika aktivitas              but are not necessary for the production
          insidentil terjadi pada saat yang bersamaan                stripping activity to continue as planned, the
          dengan pengupasan lapisan tanah tahap                      costs associated with these incidental
          produksi, namun aktivitas insidentil tersebut              operations are not included in the cost of the
          tidak harus ada untuk melanjutkan aktivitas                stripping activity asset.
          pengupasan lapisan tanah sebagaimana
          direncanakan, biaya yang terkait dengan
          aktivitas insidentil tersebut tidak dapat
          dimasukkan sebagai biaya perolehan aset
          aktivitas pengupasan lapisan tanah.

          Ketika biaya perolehan aset aktivitas                      When the costs of the stripping activity asset
          pengupasan lapisan tanah dan persediaan                    and the inventory produced are not separately
          yang diproduksi tidak dapat diidentifikasi                 identifiable, the Group allocates the
          secara terpisah, Grup mengalokasikan biaya                 production stripping costs between the
          pengupasan lapisan tanah dalam tahap                       inventory produced and the stripping activity
          produksi antara persediaan yang diproduksi                 asset using an allocation basis that is based
          dan aset aktivitas pengupasan lapisan tanah                on a relevant production measure. This
          menggunakan dasar alokasi berdasarkan                      production measure is calculated for the
          ukuran produksi yang relevan. Ukuran                       identified component of the coal body, and is
          produksi tersebut dihitung untuk komponen                  used as a benchmark to identify the extent to
          badan batubara teridentifikasi, dan digunakan              which the additional activity of creating a
          sebagai patokan untuk mengidentifikasi                     future benefit has taken place. The Group
          sejauh mana aktivitas tambahan yang                        uses the expected volume of waste extracted
          menciptakan manfaat di masa depan telah                    compared with the actual volume for a given
          terjadi. Grup menggunakan ekspektasi                       volume of coal production.
          volume material sisa tambang yang diekstrak
          dibandingkan dengan volume aktual untuk
          setiap volume produksi batubara.
Page 50
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/38 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                           30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     p.   Biaya pengupasan tanah (lanjutan)                     p.    Stripping costs (continued)

          Setelah pengakuan awal, aset aktivitas                      Subsequently, the stripping activity asset is
          pengupasan        lapisan   tanah      dicatat              carried at cost less amortisation and
          menggunakan biaya perolehan dikurangi                       impairment losses, if any. The stripping activity
          dengan amortisasi dan rugi penurunan nilai,                 asset       is     amortised      using      the
          jika ada. Aset aktivitas pengupasan lapisan                 units-of-production method over the expected
          tanah diamortisasi menggunakan metode unit                  useful life of the identified component of the
          produksi selama ekspektasi masa manfaat                     coal body that becomes more accessible as a
          dari komponen badan batubara yang                           result of the stripping activity unless another
          teridentifikasi yang menjadi lebih mudah                    method is more appropriate.
          diakses sebagai akibat dari aktivitas lapisan
          pengupasan tanah, kecuali terdapat metode
          lain yang lebih tepat.

          Perubahan pada ekspektasi masa manfaat                      Changes to the expected useful life of the
          dari komponen badan batubara yang                           identified component of the coal body are
          teridentifikasi dinyatakan sebagai perubahan                considered changes in estimates and are
          atas estimasi dan dicatat menggunakan basis                 accounted for on a prospective basis.
          prospektif.

          Aset aktivitas pengupasan lapisan tanah                     A stripping activity asset is accounted for as
          dicatat    sebagai    penambahan      atau                  an addition to, or enhancement of, an existing
          peningkatan dari aset yang ada, sehingga                    asset, and therefore is presented as part of
          disajikan sebagai “properti pertambangan”                   “mining properties” in the interim consolidated
          pada laporan posisi keuangan konsolidasian                  statements of financial position.
          interim.

          Aset aktivitas pengupasan lapisan tanah                     Any stripping activity asset is included in the
          dimasukan ke dalam basis biaya perolehan                    cost base of assets when determining a CGU
          aset saat penentuan UPK dalam tujuan                        for impairment assessment purposes.
          pengujian penurunan nilai.

          Pada tanggal laporan keuangan konsolidasian                 As at the date of these interim consolidated
          interim ini, Grup tidak memiliki biaya                      financial statements, the Group did not have
          pengupasan lapisan tanah selama tahap                       stripping costs during the production phase
          produksi yang memenuhi kriteria untuk                       which qualify for deferral in accordance with
          ditangguhkan seperti yang ditetapkan dalam                  the Group’s accounting policies.
          kebijakan akuntansi Grup.
Page 51
                                   PT ADARO ENERGY INDONESIA Tbk
                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/39 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL               2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                (continued)

     q.   Utang usaha                                          q.       Trade payables

          Utang usaha adalah kewajiban untuk                            Trade payables are obligations to pay for
          membayar barang atau jasa yang telah                          goods or services that have been acquired in
          diterima dalam kegiatan usaha normal dari                     the ordinary course of business from
          pemasok. Utang usaha diklasifikasikan                         suppliers. Trade payables are classified as
          sebagai liabilitas jangka pendek apabila                      current liabilities if payment is due within one
          pembayarannya jatuh tempo dalam waktu                         year of the reporting date. If not, they are
          satu tahun atau kurang setelah tanggal                        presented as non-current liabilities.
          pelaporan. Jika tidak, utang usaha tersebut
          disajikan sebagai liabilitas jangka panjang.

          Utang usaha pada awalnya diakui sebesar                       Trade payables are recognised initially at fair
          nilai wajar dan selanjutnya diukur pada biaya                 value and subsequently measured at
          perolehan diamortisasi dengan menggunakan                     amortised cost using the effective interest
          metode suku bunga efektif.                                    method.

     r.   Sewa                                                 r.       Leases

          Grup sebagai pesewa                                           The Group as a lessor

          Ketika Grup bertindak sebagai pesewa, Grup                    When the Group acts as a lessor, it will classify
          akan mengklasifikasi masing-masing sewanya                    each of its leases as either an operating lease
          baik sewa operasi atau sewa pembiayaan.                       or a finance lease.

          Untuk mengklasifikasi masing-masing sewa,                     To classify each lease, the Group makes an
          Grup membuat penilaian secara keseluruhan                     overall assessment of whether the lease
          atas apakah sewa mengalihkan secara                           transfers substantially all of the risks and
          substansial seluruh risiko dan manfaat yang                   rewards incidental to ownership of the
          terkait dengan kepemilikan aset pendasar.                     underlying asset. If this is the case, then the
          Jika penilaian membuktikan hal tersebut,                      lease is classified as a finance lease; if not,
          maka sewa diklasifikasikan sebagai sewa                       then it is an operating lease. Lease income
          pembiayaan; jika tidak, maka merupakan                        from operating lease where the Group acts as
          sewa operasi. Pendapatan sewa guna usaha                      a lessor is recognised as an income on a
          dari sewa operasi dimana Grup bertindak                       straight-line basis over the lease term.
          sebagai pesewa diakui sebagai pendapatan
          secara garis lurus selama masa sewa.

          Grup sebagai penyewa                                          The Group as a lessee

          Pada permulaan kontrak, Grup menilai                          At the inception of a contract, the Group
          apakah       kontrak     merupakan,    atau                   assesses whether the contract is, or contains,
          mengandung,        sewa.    Suatu   kontrak                   a lease. A contract is or contains a lease if the
          merupakan atau mengandung sewa jika                           contract conveys the right to control the use of
          kontrak tersebut memberikan hak untuk                         an identified asset for a period of time in
          mengendalikan         penggunaan       aset                   exchange for a consideration.
          identifikasian selama suatu jangka waktu
          untuk dipertukarkan dengan imbalan.
Page 52
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/40 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     r.   Sewa (lanjutan)                                       r.       Leases (continued)

          Grup sebagai penyewa (lanjutan)                                The Group as a lessee (continued)

          Untuk menilai apakah kontrak memberikan                        To assess whether a contract conveys the
          hak untuk mengendalikan penggunaan aset                        right to control the use of an identified asset,
          identifikasian, Grup akan menilai apakah:                      the Group will assess whether:

          -   Grup memiliki hak untuk mendapatkan                        -    The Group has the right to obtain
              secara substansial seluruh manfaat                              substantially all the economic benefits
              ekonomis       dari penggunaan  aset                            from the use of the asset throughout the
              identifikasian; dan                                             period of use; and
          -   Grup memiliki hak untuk mengarahkan                        -    The Group has the right to direct the use
              penggunaan aset identifikasian.                                 of the asset.

          Pada tanggal permulaan sewa, Grup                              At the commencement date of the lease, the
          mengakui aset hak-guna dan liabilitas sewa.                    Group recognises a right-of-use asset and a
          Aset hak-guna pada saat di awal, diukur pada                   lease liability. The right-of-use asset is initially
          biaya perolehan, dimana meliputi:                              measured at cost, which comprises:

          -   jumlah pengukuran awal liabilitas sewa;                    -    the initial amount of the lease liability;
          -   pembayaran sewa yang dilakukan pada                        -    lease payments made at or before the
              atau sebelum tanggal permulaan,                                 commencement date, less any lease
              dikurangi dengan insentif sewa;                                 incentive;
          -   biaya langsung awal yang dikeluarkan;                      -    initial direct costs incurred; and
              dan
          -   estimasi biaya yang akan dikeluarkan                       -    an estimate of costs to dismantle and
              untuk membongkar dan memindahkan                                remove the underlying asset to the
              aset pendasar atau untuk merestorasi                            condition required by the terms and
              aset pendasar ke kondisi yang                                   conditions of the lease.
              disyaratkan oleh syarat dan ketentuan
              sewa.

          Untuk kontrak yang mengandung komponen                         For a contract that contains a lease
          sewa dan tambahan satu atau lebih komponen                     component and one or more additional lease
          sewa atau nonsewa, Grup mengalokasikan                         or non-lease components, the Group allocates
          imbalan dalam kontrak ke masing-masing                         the consideration in the contract to each lease
          komponen sewa dan nonsewa berdasarkan                          and non-lease component on the basis of their
          harga tersendiri relatif dari komponen sewa                    relative standalone price of the lease
          dan harga tersendiri agregat dari komponen                     components and the aggregate standalone
          nonsewa.                                                       price of the non-lease components.

          Persyaratan sewa dinegosiasikan secara                         Lease terms are negotiated on individual
          individual dan berisi berbagai persyaratan dan                 bases and contain a wide range of different
          ketentuan yang berbeda. Perjanjian sewa                        terms and conditions. The lease agreements
          tidak memberlakukan perjanjian apapun                          do not impose any covenants other than the
          selain jaminan atas aset.                                      security over the assets.
Page 53
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/41 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     r.   Sewa (lanjutan)                                        r.       Leases (continued)

          Grup sebagai penyewa (lanjutan)                                The Group as a lessee (continued)

          Aset dan liabilitas yang timbul dari perjanjian                 Assets and liabilities arising from lease
          sewa pada awalnya diukur pada nilai kini                        arrangements are initially measured at the
          pembayaran sewa yang belum dibayar pada                         present value of the lease payments that are
          tanggal permulaan, didiskontokan dengan                         not paid at the commencement date,
          menggunakan suku bunga implisit dalam                           discounted using the interest rate implicit in the
          sewa atau, jika suku bunga tersebut tidak                       lease or, if that rate cannot be readily
          dapat ditentukan, maka menggunakan suku                         determined, using the incremental borrowing
          bunga pinjaman inkremental. Pada umumnya,                       rate. Generally, the Group uses its incremental
          Grup menggunakan suku bunga pinjaman                            borrowing rate as the discount rate.
          inkremental sebagai tingkat bunga diskonto.

          Pembayaran sewa yang termasuk dalam                             Lease payments included in the measurement
          pengukuran    liabilitas sewa meliputi                          of the lease liability comprise the following:
          pembayaran berikut ini:

          -   pembayaran          tetap,       termasuk                   -   fixed payments, including in-substance
              pembayaran tetap secara substansi                               fixed payments less any lease incentive
              dikurangi dengan piutang insentif sewa;                         receivable;
          -   pembayaran       sewa     variabel   yang                   -   variable lease payments that depend on
              bergantung pada indeks atau suku bunga                          an index or a rate, initially measured using
              yang pada awalnya diukur dengan                                 the index or rate as at the commencement
              menggunakan indeks atau suku bunga                              date;
              pada tanggal permulaan;
          -   jumlah     yang      diperkirakan    akan                   -   amounts expected to be payable under a
              dibayarkan oleh penyewa dengan                                  residual value guarantee;
              jaminan nilai residual;
          -   harga eksekusi opsi beli jika Grup cukup                    -   the exercise price under a purchase
              pasti untuk mengeksekusi opsi tersebut;                         option that the Group is reasonably
              dan                                                             certain to exercise; and
          -   pembayaran penalti karena penghentian                       -   penalty payments for early termination of
              awal sewa kecuali jika Grup cukup pasti                         a lease unless the Group is reasonably
              untuk tidak menghentikan lebih awal.                            certain not to terminate early.

          Pembayaran sewa dialokasikan menjadi                            Each lease payment is allocated between the
          bagian pokok dan biaya keuangan. Biaya                          liability and finance cost. The finance cost is
          keuangan dibebankan pada laba rugi selama                       charged to profit or loss over the lease period
          periode sewa sehingga menghasilkan tingkat                      so as to produce a constant periodic rate of
          suku bunga periodik yang konstan atas saldo                     interest on the remaining balance of the
          liabilitas untuk setiap periode.                                liability for each period.

          Grup menyajikan aset hak-guna sebagai                           The Group presents right-of-use assets as part
          bagian dari “Aset tetap” di dalam laporan                       of “Fixed assets” in the interim consolidated
          posisi keuangan konsolidasian interim. Aset                     statements of financial position. Right-of-use
          hak-guna juga diuji penurunan nilainya                          assets are also tested for impairment in
          dengan mengacu pada kebijakan akuntansi                         accordance with the policy described in
          pada Catatan 2m.                                                Note 2m.
Page 54
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/42 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     r.   Sewa (lanjutan)                                       r.       Leases (continued)

          Grup sebagai penyewa (lanjutan)                                The Group as a lessee (continued)

          Aset   hak-guna     umumnya      disusutkan                    Right-of-use assets are generally depreciated
          sepanjang waktu yang lebih pendek antara                       over the shorter of the asset’s useful life and
          lama masa manfaat aset dan jangka waktu                        the lease term on a straight-line basis. If the
          sewa menggunakan metode garis lurus. Jika                      Group is reasonably certain to exercise a
          Grup cukup yakin untuk melaksanakan opsi                       purchase option, the right-of-use asset is
          pembelian, aset hak-guna disusutkan selama                     depreciated over the underlying asset’s useful
          masa manfaat aset yang mendasarinya.                           life.

          Sewa jangka pendek dan sewa yang aset                          Short-term leases and low-value asset leases
          pendasarnya bernilai rendah

          Grup memutuskan untuk tidak mengakui aset                      The Group has elected not to recognise right-
          hak-guna dan liabilitas sewa untuk sewa                        of-use assets and lease liabilities for short-
          jangka pendek yang memiliki masa sewa 12                       term leases that have a lease term of 12
          bulan atau kurang dan sewa yang aset                           months or less and leases of low-value assets.
          pendasarnya bernilai rendah. Grup mengakui                     The Group recognises the lease payments
          pembayaran sewa atas sewa tersebut sebagai                     associated with these leases as an expense
          beban dengan dasar garis lurus selama masa                     on a straight-line basis over the lease term.
          sewa.

          Modifikasi sewa                                                Lease modification

          Grup mencatat modifikasi sewa sebagai sewa                     The Group accounts for a lease modification
          terpisah jika:                                                 as a separate lease if:

          -   modifikasi meningkatkan ruang lingkup                      -   the modification increases the scope of
              sewa dengan menambahkan hak untuk                              the lease by adding the right to use one or
              menggunakan satu aset pendasar atau                            more underlying assets; and
              lebih; dan
          -   imbalan sewa meningkat sebesar jumlah                      -   the consideration for the lease increases
              yang setara dengan harga tersendiri                            by an amount commensurate with the
              untuk peningkatan dalam ruang lingkup                          standalone price for the increase in scope
              dan penyesuaian yang tepat pada harga                          and any appropriate adjustments to that
              tersendiri tersebut untuk merefleksikan                        standalone     price    to    reflect   the
              kondisi kontrak tertentu.                                      circumstances of the particular contract.

          Untuk modifikasi sewa yang tidak dicatat                       For a lease modification that is not accounted
          sebagai sewa terpisah, pada tanggal efektif                    for as a separate lease, at the effective date of
          modifikasi sewa, Grup:                                         the lease modification, the Group:

          -   mengukur kembali dan mengalokasikan                        -   remeasures          and     allocates      the
              imbalan kontrak modifikasian;                                  consideration in the modified contract;
          -   menentukan masa sewa dari sewa                             -   determines the lease term of the modified
              modifikasian;                                                  lease;
          -   mengukur kembali liabilitas sewa dengan                    -   remeasures the lease liability by
              mendiskontokan      pembayaran      sewa                       discounting the revised lease payments
              revisian menggunakan tingkat diskonto                          using a revised discount rate. At the
              revisian. Pada tanggal efektif modifikasi,                     effective date of the modification, the
              tingkat diskonto revisian ditentukan                           revised discount rate is determined as the
              sebagai      suku    bunga      pinjaman                       Group’s incremental borrowing rate for
              inkremental Grup untuk sisa masa sewa;                         the remainder of the lease term;
          -   menurunkan jumlah tercatat aset hak-                       -   decreases the carrying amount of the
              guna untuk merefleksikan penghentian                           right-of-use asset to reflect the partial or
              sebagian atau sepenuhnya sewa untuk                            full termination of the lease for lease
              modifikasi sewa yang menurunkan ruang                          modifications that decrease the scope of
              lingkup sewa. Grup mengakui dalam laba                         the lease. The Group recognises in profit
              rugi setiap keuntungan atau kerugian                           or loss any gain or loss relating to the
              yang     terkait  dengan     penghentian                       partial or full termination of the lease; and
              sebagian     atau   sepenuhnya      sewa
              tersebut; dan
          -   membuat penyesuaian terkait aset hak-                      -   makes a corresponding adjustment to the
              guna untuk seluruh modifikasi sewa                             right-of-use asset for all other lease
              lainnya.                                                       modifications.
Page 55
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/43 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     s.   Provisi                                                  s.   Provisions

          i.   Provisi pembongkaran, rehabilitasi,                      i.   Provision for decommissioning, mine
               reklamasi dan penutupan tambang                               rehabilitation, reclamation and mine
                                                                             closure

               Reklamasi, rehabilitasi, dan biaya                            Reclamation,       rehabilitation   and
               lingkungan yang berkaitan dengan                              environmental expenditure to be incurred
               pemulihan atas area yang terganggu                            related to the remediation of disturbed
               selama tahap produksi dibebankan pada                         areas during the production phase are
               beban pokok pendapatan pada saat                              charged to the cost of revenue when an
               kewajiban dari pemulihan atas area yang                       obligation arising from the disturbance
               terganggu tersebut timbul selama                              occurs as extraction progresses.
               penambangan.

               Kewajiban ini diakui sebagai liabilitas                       These obligations are recognised as
               pada saat timbulnya kewajiban hukum                           liabilities when a legal or constructive
               atau konstruktif yang berasal dari aktivitas                  obligation has arisen from activities that
               yang telah dilaksanakan. Kewajiban ini                        have already been performed. This
               diukur pada saat dan setelah pengakuan                        obligation is initially and subsequently
               sebesar nilai kini dari perkiraan                             measured at the present value of the
               pengeluaran yang diperlukan untuk                             expenditure expected to be required to
               menyelesaikan         kewajiban     dengan                    settle the obligation using a pre-tax rate,
               menggunakan tingkat diskonto sebelum                          which       reflects    current     market
               pajak, yang mencerminkan penilaian                            assessments of the time value of money
               pasar kini atas nilai waktu uang dan risiko                   and the risks specific to the obligation.
               yang terkait dengan kewajiban tersebut.                       Changes in the measurement of a liability
               Perubahan pada pengukuran kewajiban                           which arise during production are also
               yang timbul selama tahap produksi juga                        charged to the cost of revenue, while the
               dibebankan ke beban pokok pendapatan,                         increase in the provision due to the
               sementara peningkatan kewajiban yang                          passage of time is recognised as finance
               sehubungan dengan berlalunya waktu                            costs.
               diakui sebagai biaya keuangan.

               Provisi pembongkaran aset-aset tambang                        Provision for decommissioning of mining
               dan kegiatan pascatambang terkait                             assets and related post-mining activities,
               beserta peninggalan dan pembongkaran                          as well as the abandonment and
               aset-aset berumur panjang dibentuk                            decommissioning of other long-lived
               sehubungan dengan kewajiban hukum                             assets, is made for the legal obligations
               berkaitan    dengan    penarikan     aset                     associated with the retirement of mining
               tambang terkait dan aset berumur                              related assets and other long-lived assets
               panjang lainnya termasuk pembongkaran                         including the decommissioning of
               bangunan, peralatan, fasilitas peremukan                      buildings, equipment, crushing and
               dan pengolahan, infrastruktur, dan                            handling facilities, infrastructure and
               fasilitas lainnya yang berasal dari                           other facilities that resulted from the
               pembelian,         konstruksi       atau                      acquisition, construction or development
               pengembangan aset tersebut.                                   of such assets.

               Kewajiban ini diakui sebagai liabilitas                       These obligations are recognised as
               pada saat timbulnya kewajiban hukum                           liabilities when a legal or constructive
               atau konstruktif yang berkaitan dengan                        obligation with respect to the retirement of
               penarikan     sebuah       aset,   dengan                     an asset is incurred, with initial and
               pengukuran pada saat dan setelah                              subsequent       measurement        of  the
               pengakuan sebesar nilai kini dari                             obligation at the present value of the
               perkiraan pengeluaran yang diperlukan                         expenditure expected to be required to
               untuk menyelesaikan kewajiban dengan                          settle the obligation using a pre-tax rate
               menggunakan tingkat diskonto sebelum                          that reflects current market assessments
               pajak, yang mencerminkan penilaian                            of the time value of money and the risks
               pasar kini atas nilai waktu uang dan risiko                   specific to the obligation.
               yang terkait dengan kewajiban tersebut.
Page 56
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/44 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     s.   Provisi (lanjutan)                                      s.    Provisions (continued)

          i.    Provisi pembongkaran, rehabilitasi,                     i.    Provision for decommissioning, mine
                reklamasi dan penutupan tambang                               rehabilitation, reclamation and mine
                (lanjutan)                                                    closure (continued)

                Biaya penarikan aset dalam jumlah yang                        An asset retirement cost equivalent to
                setara dengan jumlah liabilitas tersebut                      these liabilities is capitalised as part of the
                dikapitalisasi sebagai bagian dari suatu                      related asset’s carrying amount, and is
                aset tertentu dan kemudian disusutkan                         subsequently depreciated or depleted
                atau dideplesi selama masa manfaat aset                       over the asset’s useful life. The increase
                tersebut.      Peningkatan    kewajiban                       in these obligations due to the passage of
                sehubungan dengan berlalunya waktu                            time is recognised as part of finance
                diakui dalam biaya keuangan.                                  costs.

                Perubahan dalam pengukuran kewajiban                          The changes in the measurement of
                pembongkaran       yang     timbul    dari                    decommissioning obligations that result
                perubahan estimasi waktu atau jumlah                          from changes in the estimated timing or
                pengeluaran sumber daya ekonomis                              amount of the outflow of resources
                (contohnya: arus kas) yang diperlukan                         embodying economic benefits (e.g. cash
                untuk menyelesaikan kewajiban tersebut,                       flow) required to settle the obligations, or
                atau perubahan dalam tingkat diskonto,                        a change in the discount rate, will be
                akan       ditambahkan      pada     atau                     added to or deducted from the cost of the
                dikurangkan dari, harga perolehan aset                        related asset in the current year. The
                yang bersangkutan pada tahun berjalan.                        amount deducted from the cost of the
                Jumlah yang dikurangkan dari harga                            asset should not exceed its carrying
                perolehan aset tidak boleh melebihi                           amount. If a decrease in the liability
                jumlah tercatatnya. Jika penurunan dalam                      exceeds the carrying amount of the asset,
                liabilitas melebihi nilai tercatat aset,                      the excess is recognised immediately in
                kelebihan tersebut segera diakui dalam                        profit or loss. If the adjustment results in
                laba rugi. Jika penyesuaian tersebut                          an addition to the cost of an asset, the
                menghasilkan penambahan pada harga                            Group will consider whether this is an
                perolehan       aset,      Grup     akan                      indication that the new carrying amount of
                mempertimbangkan apakah hal ini                               the asset may not be fully recoverable. If
                mengindikasikan bahwa nilai tercatat aset                     there is any such indication, the Group
                yang baru mungkin tidak bisa dipulihkan                       will test the asset for impairment by
                secara penuh. Jika terdapat indikasi                          estimating its recoverable amount and
                tersebut, Grup akan melakukan pengujian                       will account for any impairment losses
                penurunan nilai terhadap aset tersebut                        incurred.
                dengan melakukan estimasi atas nilai
                yang dapat dipulihkan dan akan
                memperhitungkan setiap kerugian dari
                penurunan nilai yang terjadi.

          ii.   Provisi lain-lain                                       ii.   Other provisions

                Provisi untuk biaya restrukturisasi,                          Provisions for restructuring costs, legal
                tuntutan hukum, atau hal-hal yang                             claims, or environmental issues that may
                berkaitan dengan lingkungan yang tidak                        not involve the retirement of an asset,
                berkaitan dengan penghentian aset,                            reclamation and closure of mining areas
                reklamasi,   dan     penutupan     area                       and others are recognised when:
                pertambangan dan lainnya diakui ketika:

                   Grup memiliki kewajiban hukum atau                            the Group has a present legal or
                    konstruktif saat kini sebagai akibat                           constructive obligation as a result of
                    dari peristiwa masa lalu;                                      past events;
                   kemungkinan arus keluar sumber                                it is probable that an outflow of
                    daya          diperlukan      untuk                            resources will be required to settle
                    menyelesaikan kewajiban tersebut;                              the obligation; and
                    dan
                   jumlahnya dapat diestimasi secara                             the amount         can     be    reliably
                    andal.                                                         estimated.
Page 57
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/45 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                    2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                     (continued)

     s.   Provisi (lanjutan)                                        s.       Provisions (continued)

          ii.   Provisi lain-lain (lanjutan)                                 ii.   Other provisions (continued)

                Jika terdapat sejumlah kewajiban serupa,                           Where there are a number of similar
                maka kemungkinan arus keluar untuk                                 obligations, the likelihood that an outflow
                menyelesaikan         kewajiban     tersebut                       will be required in settlement is
                ditentukan dengan mempertimbangkan                                 determined by considering the class of
                secara keseluruhan kelompok kewajiban.                             obligations as a whole. Although the
                Walaupun kemungkinan arus keluar                                   likelihood of an outflow in respect of any
                sehubungan         dengan     setiap     pos                       one item may be small, it is probable that
                kewajiban tersebut kecil, terdapat                                 some outflow of resources will be needed
                kemungkinan besar dibutuhkan arus                                  to settle the class of obligations as a
                keluar sumber daya untuk menyelesaikan                             whole. If that is the case, a provision is
                kelompok kewajiban secara keseluruhan.                             recognised.
                Jika hal itu terjadi, maka provisi diakui.

                Provisi diukur pada nilai kini dari estimasi                       The provision is measured at the present
                terbaik manajemen atas pengeluaran                                 value of management’s best estimate of
                yang diperlukan untuk menyelesaikan                                the expenditure expected to be required
                kewajiban dengan menggunakan tingkat                               to settle the present obligation using a
                diskonto     sebelum       pajak,       yang                       pre-tax rate that reflects current market
                mencerminkan penilaian pasar kini atas                             assessments of the time value of money
                nilai waktu uang dan risiko yang terkait                           and the risks specific to the liability. The
                dengan liabilitas yang bersangkutan.                               increase in the provision due to the
                Peningkatan provisi sehubungan dengan                              passage of time is recognised as part of
                berlalunya waktu diakui sebagai bagian                             finance costs.
                dari biaya keuangan.

     t.   Pinjaman                                                  t.       Borrowings

          Pinjaman diakui pada awalnya sebesar nilai                         Borrowings are recognised initially at their fair
          wajar, dikurangi dengan biaya transaksi yang                       value, net of any transaction costs incurred.
          terjadi. Pinjaman kemudian dicatat sebesar                         Borrowings are subsequently carried at
          biaya perolehan diamortisasi, dengan selisih                       amortised cost, with any difference between
          antara hasil perolehan (dikurangi dengan                           the proceeds (net of transaction costs) and the
          biaya transaksi) dan nilai penarikan diakui                        redemption value recognised in profit or loss
          dalam laba rugi selama periode pinjaman                            over the period of the borrowing, using the
          dengan menggunakan metode suku bunga                               effective interest method.
          efektif.

          Biaya-biaya yang dibayar untuk mendapatkan                         Fees paid on the establishment of loan
          fasilitas pinjaman diakui sebagai biaya                            facilities are recognised as transaction costs
          transaksi pinjaman tersebut, apabila besar                         of the loan to the extent that it is probable that
          kemungkinan akan dilakukan penarikan atas                          some or all of the facilities will be drawn down.
          sebagian atau seluruh fasilitas tersebut.                          In this case, the fee is deferred until the
          Dalam hal ini, biaya tersebut ditangguhkan                         drawdown occurs. To the extent that there is
          sampai dilakukan penarikan. Apabila tidak                          no evidence that it is probable that some or all
          terdapat bukti bahwa kemungkinan besar                             of the facility will be drawn down, the fee is
          akan dilakukan penarikan atas sebagian atau                        capitalised as a prepayment for financing
          seluruh fasilitas tersebut, biaya tersebut                         costs and amortised over the period of the
          dikapitalisasi sebagai biaya dibayar dimuka                        facility to which it relates. Borrowings are
          untuk biaya keuangan dan diamortisasi                              classified as current liabilities unless the
          selama periode fasilitas terkait. Pinjaman                         Group has a right at the end of the reporting
          diklasifikasikan sebagai liabilitas jangka                         period to defer the settlement of the liability for
          pendek kecuali Grup memiliki hak pada akhir                        at least 12 months from the reporting date.
          periode       pelaporan   untuk    menunda
          pembayaran liabilitas selama paling tidak 12
          bulan dari tanggal pelaporan.
Page 58
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/46 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     u.   Biaya pinjaman                                          u.   Borrowing costs

          Biaya pinjaman baik yang secara langsung                     Borrowing costs either directly or indirectly
          ataupun tidak langsung dapat diatribusikan                   attributable to the acquisition, construction or
          dengan akuisisi, konstruksi atau produksi aset               production of a qualifying asset are capitalised
          kualifikasian, dikapitalisasi sebagai bagian                 as part of the cost of that asset until such time
          biaya perolehan aset tersebut sampai aset                    as the asset is substantially ready for its
          tersebut siap untuk digunakan sesuai dengan                  intended use or sale. For borrowings directly
          maksudnya atau dijual. Untuk pinjaman yang                   attributable to a qualifying asset, the amount
          dapat diatribusi secara langsung pada suatu                  to be capitalised is determined as the actual
          aset kualifikasian, jumlah yang dikapitalisasi               borrowing costs incurred during the period,
          adalah sebesar biaya pinjaman yang terjadi                   less any income earned on the temporary
          selama       periode     berjalan,   dikurangi               investment of such borrowings. For
          pendapatan investasi lain-lain dari pinjaman                 borrowings that are not directly attributable to
          tersebut. Untuk pinjaman yang tidak dapat                    a qualifying asset, the amount to be
          diatribusi secara langsung pada suatu aset                   capitalised is determined by applying a
          kualifikasian, jumlah biaya pinjaman yang                    capitalisation rate to the amount spent on the
          dikapitalisasi ditentukan dengan mengalikan                  qualifying asset. An entity shall cease
          tingkat kapitalisasi dengan pengeluaran untuk                capitalising     borrowing        costs     when
          aset kualifikasian. Entitas menghentikan                     substantially all of the activities necessary to
          kapitalisasi biaya pinjaman ketika secara                    prepare the qualifying assets are complete.
          substansial seluruh aktivitas yang diperlukan
          untuk mempersiapkan aset kualifikasian telah
          selesai.

          Semua biaya pinjaman lainnya diakui dalam                    All other borrowing costs are recognised in
          laba rugi pada periode dimana biaya-biaya                    profit or loss in the period in which they are
          tersebut terjadi.                                            incurred.

     v.   Imbalan kerja karyawan                                  v.   Employee benefits

          i.   Imbalan pasca kerja                                     i.   Post-employment benefits

               Skema pensiun diklasifikasikan sebagai                       Pension schemes are classified as either
               program iuran pasti atau program imbalan                     defined contribution plans or defined
               pasti, tergantung pada substansi ekonomi                     benefit plans, depending on the
               dari syarat dan kondisi utama program                        economic substance of the plan as
               tersebut.                                                    derived from its principal terms and
                                                                            conditions.

               Program iuran pasti adalah program                           A defined contribution plan is a pension
               pensiun      yang     mewajibkan     Grup                    plan under which the Group pays fixed
               membayar sejumlah iuran tertentu                             contributions into a separate entity. The
               kepada entitas terpisah. Grup tidak                          Group has no legal or constructive
               memiliki     kewajiban      hukum    atau                    obligations to pay further contributions if
               konstruktif untuk membayar iuran lebih                       the fund does not hold sufficient assets to
               lanjut jika entitas tersebut tidak memiliki                  pay all employees the benefits relating to
               aset yang cukup untuk membayar seluruh                       employee service in the current and prior
               imbalan atas jasa yang diberikan pekerja                     years.
               pada tahun berjalan dan tahun-tahun
               sebelumnya.

               Program imbalan pasti adalah program                         A defined benefit plan is a pension plan
               pensiun yang bukan merupakan program                         that is not a defined contribution plan.
               iuran pasti. Program imbalan pasti adalah                    Typically, defined benefit plans define an
               program pensiun yang menentukan                              amount of pension benefit that an
               jumlah imbalan pensiun yang akan                             employee will receive upon retirement,
               diterima seorang pekerja pada saat                           usually dependent on one or more factors
               pensiun, biasanya berdasarkan pada satu                      such as age, years of service and
               atau lebih faktor seperti usia, masa kerja,                  compensation.
               dan kompensasi.
Page 59
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/47 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     v.   Imbalan kerja karyawan (lanjutan)                        v.   Employee benefits (continued)

          i.   Imbalan pasca kerja (lanjutan)                           i.   Post-employment benefits (continued)

               Grup harus mencadangkan jumlah                                The Group is required to allocate a
               minimal imbalan pensiun sesuai dengan                         provision for a minimum amount of
               peraturan ketenagakerjaan pada hukum                          pension benefit in accordance with the
               yang berlaku di Indonesia (“Peraturan                         manpower regulations on the applicable
               Ketenagakerjaan”) atau Perjanjian Kerja                       law      in    Indonesia     (“Manpower
               Bersama     (“PKB”)   atau   Peraturan                        Regulations”) or the Group’s Collective
               Perusahaan (“PP”), mana yang lebih                            Labour Agreement (the “CLA”) or
               tinggi.   Oleh     karena    Peraturan                        Company Regulation (“CR”), whichever
               Ketenagakerjaan atau PKB atau PP                              is higher. Since the Manpower
               menetapkan formula untuk menghitung                           Regulations or the CLA or the CR sets the
               jumlah minimal imbalan pensiun, maka                          formula for determining the minimum
               pada dasarnya,      program pensiun                           amount of benefits, in substance pension
               berdasarkan Peraturan Ketenagakerjaan                         plans under the Manpower Regulations
               atau PKB atau PP adalah program                               or the CLA or the CR represent defined
               imbalan pasti.                                                benefit plans.

               Sehubungan dengan program imbalan                             The liability recognised in the interim
               pasti, liabilitas diakui pada laporan posisi                  consolidated statements of financial
               keuangan konsolidasian interim setara                         position in respect of defined benefit
               dengan nilai kini kewajiban imbalan pasti                     pension plans is equivalent to the present
               pada akhir tahun pelaporan dikurangi nilai                    value of the defined benefit obligation at
               wajar aset program. Kewajiban imbalan                         the end of the reporting year less the fair
               pasti dihitung setiap tahun oleh aktuaris                     value of plan assets. The defined benefit
               independen         dengan     menggunakan                     obligation is calculated annually by
               metode Projected Unit Credit.                                 independent     actuaries     using    the
                                                                             Projected Unit Credit method.

               Nilai kini kewajiban imbalan pasti                            The present value of the defined benefit
               ditentukan dengan mendiskontokan arus                         obligation is determined by discounting
               kas keluar yang diestimasi dengan                             the estimated future cash outflows using
               menggunakan tingkat bunga obligasi                            the interest rates of high-quality corporate
               korporat    berkualitas tinggi  dalam                         bonds that are denominated in the
               denominasi mata uang dimana imbalan                           currency in which the benefits will be
               akan dibayarkan dan memiliki jangka                           paid, and that have terms of maturity
               waktu jatuh tempo mendekati jangka                            approximating the terms of the related
               waktu kewajiban pensiun. Apabila tidak                        pension obligations. When there is no
               terdapat pasar aktif untuk obligasi                           deep market for such bonds, the market
               korporat tersebut, digunakan bunga                            rates of government bonds are used.
               obligasi pemerintah.

               Biaya jasa lalu diakui segera dalam laba                      Past service costs are recognised
               rugi. Keuntungan dan kerugian atas                            immediately in profit or loss. Gains or
               kurtailmen atau penyelesaian suatu                            losses on the curtailment or settlement of
               program imbalan pasti diakui pada saat                        a defined benefit plan are recognised
               kurtailmen atau penyelesaian tersebut                         when the curtailment or settlement
               terjadi.                                                      occurs.

               Pengukuran kembali yang timbul dari                           Remeasurements          arising   from
               penyesuaian pengalaman dan perubahan                          experience adjustments and changes in
               asumsi-asumsi aktuarial dibebankan atau                       actuarial assumptions are charged or
               dikreditkan pada ekuitas dalam laporan                        credited to equity in the statement of
               penghasilan komprehensif lain pada                            other comprehensive income in the
               periode dimana beban tersebut terjadi.                        period in which they arise. The
               Akumulasi saldo pengukuran kembali                            accumulated remeasurements balance is
               dilaporkan di saldo laba.                                     reported in retained earnings.
Page 60
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/48 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     v.   Imbalan kerja karyawan (lanjutan)                      v.    Employee benefits (continued)

          i.    Imbalan pasca kerja (lanjutan)                         i.    Post-employment benefits (continued)

                Untuk program iuran pasti, Grup                              For defined contribution plans, the Group
                membayar iuran untuk program jaminan                         pays contributions for old age protection
                hari tua dan jaminan pensiun yang                            and pension protection to the Government
                dikelola oleh Pemerintah, dengan dasar                       administered pension insurance plans on
                kewajiban. Grup tidak memiliki kewajiban                     a mandatory basis. The Group has no
                membayar lebih lanjut jika iuran tersebut                    further payment obligations once the
                telah dibayarkan. Iuran tersebut diakui                      contributions have been paid. The
                sebagai beban imbalan kerja ketika jatuh                     contributions are recognised as employee
                tempo. Iuran dibayar dimuka diakui                           benefit expenses when they become due.
                sebagai aset sepanjang pengembalian                          Prepaid contributions are recognised as
                dana atau pengurangan pembayaran                             an asset to the extent that a cash refund
                masa depan dimungkinkan.                                     or reduction in future payments is
                                                                             available.

          ii.   Pesangon pemutusan kontrak kerja                       ii.   Termination benefits

                Pesangon pemutusan kontrak kerja                             Termination benefits are payable when
                dibayarkan ketika pekerja diberhentikan,                     employment is terminated by the Group
                atau ketika pekerja menerima tawaran                         or when the employee accepts a
                imbalan dari entitas atas terminasi                          compensation offer from the entity for
                kontrak kerja. Grup mengakui pesangon                        terminating the employment contract.
                pemutusan kontrak kerja pada tanggal                         The Group recognises termination
                yang lebih dahulu dari: (i) ketika Grup                      benefits at the earlier of the following
                tidak bisa lagi membatalkan penawaran                        dates: (i) when the Group can no longer
                pesangon; dan (ii) ketika Grup mengakui                      withdraw the offer of those benefits; and
                biaya untuk restrukturisasi yang berada                      (ii) when the Group recognises costs for
                dalam lingkup PSAK No. 237, “Provisi,                        a restructuring that is within the scope of
                Liabilitas    Kontinjensi   dan     Aset                     SFAS No. 237, “Provisions, Contingent
                Kontinjensi” dan melibatkan pembayaran                       Liabilities and Contingent Assets” and
                pesangon pemutusan kontrak kerja.                            involves the payment of termination
                Dalam hal pekerja menerima tawaran                           benefits. In the case the employee
                imbalan dari entitas atas terminasi                          accepts an offer of compensation from
                kontrak kerja, pesangon pemutusan                            the entity upon termination of the
                kontrak    kerja    diukur  berdasarkan                      employment contract, the termination
                ekspektasi jumlah karyawan yang                              benefits are measured based on the
                menerima        penawaran       tersebut.                    number of employees expected to accept
                Pesangon pemutusan kontrak kerja yang                        the offer. Benefits falling due more than
                jatuh tempo lebih dari 12 bulan setelah                      12 months after the reporting date are
                tanggal pelaporan didiskontokan ke nilai                     discounted to their present value.
                kini.
Page 61
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/49 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     w.   Modal saham                                             w.       Share capital

          Saham biasa dikelompokkan sebagai ekuitas,                       Ordinary shares are classified as equity, and
          dan biaya langsung yang berkaitan dengan                         incremental costs directly attributable to the
          penerbitan saham baru atau opsi disajikan                        issuance of new shares or options are shown
          sebagai pengurang ekuitas, setelah dikurangi                     in equity as a deduction, net of tax, from the
          pajak, dari jumlah yang diterima.                                proceeds.

     x.   Saham treasuri                                          x.       Treasury shares

          Ketika Perusahaan membeli modal saham                            When       the    Company       purchases      the
          ekuitas Perusahaan (saham treasuri), imbalan                     Company’s equity share capital (treasury
          yang dibayar, termasuk biaya tambahan yang                       shares), the consideration paid, including any
          secara     langsung      dapat    diatribusikan                  directly attributable incremental costs (net of
          (dikurangi pajak penghasilan) dikurangkan                        income taxes) is deducted from equity
          dari ekuitas yang diatribusikan kepada pemilik                   attributable to the Company’s equity holders
          ekuitas Perusahaan sampai saham tersebut                         until the shares are cancelled or reissued.
          dibatalkan atau diterbitkan kembali. Ketika                      Where such ordinary shares are subsequently
          saham biasa tersebut selanjutnya diterbitkan                     reissued, any consideration received, net of
          kembali, imbalan yang diterima, dikurangi                        any      directly    attributable     incremental
          biaya tambahan transaksi yang terkait dan                        transaction costs and the related income tax
          dampak pajak penghasilan yang terkait                            effects, is included in equity attributable to the
          dimasukkan pada ekuitas yang dapat                               Company’s equity holders.
          diatribusikan    kepada      pemilik     ekuitas
          Perusahaan.

     y.   Laba per saham                                          y.       Earnings per share

          Laba per saham dasar dihitung dengan                             Basic earnings per share is calculated by
          membagi laba periode berjalan yang                               dividing the profit for the period attributable to
          diatribusikan kepada pemegang saham                              the equity holders of the Company by the
          Perusahaan      dengan  jumlah   rata-rata                       weighted-average number of ordinary shares
          tertimbang saham biasa yang beredar pada                         outstanding during the period.
          periode berjalan.

          Laba per saham dilusian dihitung dengan                          Diluted earnings per share is calculated by
          membagi laba periode berjalan yang                               dividing profit for the period attributable to the
          diatribusikan kepada pemegang modal                              equity holders of the Company adjusted for
          Perusahaan yang telah disesuaikan dengan                         finance costs and foreign exchange gains or
          biaya keuangan dan keuntungan atau                               losses on convertible bonds and their related
          kerugian selisih kurs atas utang obligasi                        tax effects, by the weighted-average number
          konversi, serta pengaruh pajak yang                              of issued and fully paid-up shares during the
          bersangkutan, dengan jumlah tertimbang                           period, assuming that all options have been
          saham yang ditempatkan dan disetor penuh                         exercised and all convertible bonds have been
          selama      periode   yang    bersangkutan,                      converted.
          berdasarkan asumsi bahwa semua opsi telah
          dilaksanakan dan seluruh utang obligasi
          konversi telah dikonversikan.

     z.   Pembagian dividen                                       z.       Dividend distributions

          Pembagian dividen kepada pemegang saham                          Dividend distributions to the Company’s
          Perusahaan diakui sebagai liabilitas dalam                       shareholders are recognised as liabilities in
          laporan keuangan konsolidasian interim                           the interim consolidated financial statements
          dalam periode ketika pembagian dividen telah                     in the period when the dividends are declared.
          diumumkan.
Page 62
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/50 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                      2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                       (continued)

     aa.   Kombinasi bisnis entitas sepengendali                      aa.   Business combinations of entities under
                                                                            common control

           Kombinasi bisnis entitas sepengendali                            Business combinations of entities under
           dibukukan menggunakan metode penyatuan                           common control are accounted for using the
           kepemilikan (pooling-of-interests).                              pooling-of-interests method.

           Selisih antara harga konsiderasi yang diterima                   The difference between the consideration
           dengan nilai tercatat setiap transaksi                           received and the carrying amount of each
           restrukturisasi antara entitas sepengendali                      restructuring transaction among entities under
           dibukukan sebagai bagian tambahan modal                          common control is recorded as part of
           disetor dalam bagian ekuitas di laporan posisi                   additional paid-in capital in the equity section
           keuangan konsolidasian interim.                                  of the interim consolidated statements of
                                                                            financial position.

     ab.   Pengakuan pendapatan dan beban                             ab.   Revenue and expense recognition

           Pendapatan dari kontrak dengan pelanggan                         Revenue from contracts with customers

           Pengakuan pendapatan harus memenuhi lima                         Revenue recognition has to fulfil five steps of
           langkah analisa sebagai berikut:                                 assessment:

           1.   Identifikasi kontrak dengan pelanggan.                      1.   Identify contract(s) with a customer.
           2.   Identifikasi kewajiban pelaksanaan dalam                    2.   Identify the performance obligations in the
                kontrak.       Kewajiban        pelaksanaan                      contract. Performance obligations are
                merupakan janji-janji dalam kontrak untuk                        promises in a contract to transfer to a
                menyerahkan barang atau jasa yang                                customer goods or services that are
                memiliki     karakteristik    berbeda      ke                    distinct.
                pelanggan.
           3.   Penetapan harga transaksi. Harga                            3.   Determine the transaction price. The
                transaksi merupakan jumlah imbalan                               transaction price is the amount of
                yang berhak diperoleh suatu entitas                              consideration to which an entity expects
                sebagai kompensasi atas diserahkannya                            to be entitled in exchange for transferring
                barang atau jasa yang dijanjikan ke                              promised goods or services to a
                pelanggan. Jika imbalan yang dijanjikan                          customer. If the consideration promised in
                di kontrak mengandung suatu jumlah                               a contract includes a variable amount, the
                yang bersifat variabel, maka Grup                                Group estimates the amount of
                membuat estimasi jumlah imbalan                                  consideration to which it expects to be
                tersebut sebesar jumlah yang diharapkan                          entitled in exchange for transferring the
                berhak diterima atas diserahkannya                               promised goods or services to a customer
                barang atau jasa yang dijanjikan ke                              less the estimated amount of service level
                pelanggan dikurangi dengan estimasi                              guarantee that will be paid during the
                jumlah jaminan kinerja jasa yang akan                            contract period.
                dibayarkan selama periode kontrak.
           4.   Alokasi harga transaksi ke setiap                           4.   Allocate the transaction price to each
                kewajiban         pelaksanaan        dengan                      performance obligation on the basis of the
                menggunakan dasar harga jual berdiri                             relative stand-alone selling prices of each
                sendiri relatif dari setiap barang atau jasa                     distinct item of goods or services
                berbeda yang dijanjikan di kontrak. Ketika                       promised in the contract. Where these are
                tidak dapat diamati secara langsung,                             not directly observable, the relative stand-
                harga     jual     berdiri   sendiri   relatif                   alone selling prices are estimated based
                diperkirakan berdasarkan biaya yang                              on expected cost plus margin.
                diharapkan ditambah marjin.
           5.   Pengakuan pendapatan ketika kewajiban                       5.   Recognise       revenue     when      the
                pelaksanaan telah dipenuhi dengan                                performance obligation is satisfied by
                menyerahkan barang atau jasa yang                                transferring the promised goods or
                dijanjikan      ke     pelanggan      (ketika                    services to a customer (which is when the
                pelanggan telah memiliki kendali atas                            customer obtains control of those goods
                barang atau jasa tersebut).                                      or services).
Page 63
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/51 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     ab.   Pengakuan      pendapatan      dan     beban          ab.   Revenue     and       expense      recognition
           (lanjutan)                                                  (continued)

           Pendapatan dari kontrak dengan pelanggan                    Revenue from contracts with customers
           (lanjutan)                                                  (continued)

           Pendapatan dari penjualan barang diakui                     Revenue from sales of goods is recognised
           ketika pengendalian dialihkan kepada                        when control transfers to the customer. There
           pelanggan. Terdapat kondisi di mana                         may be circumstances when judgement is
           pertimbangan diperlukan berdasarkan lima                    required based on the five indicators of control
           indikator pengendalian di bawah ini:                        below:

           1.   Pelanggan telah memiliki risiko dan                    1.   The customer has the significant risks and
                manfaat signifikan atas kepemilikan aset                    rewards of ownership and has the ability
                dan memperoleh kemampuan untuk                              to direct the use of, and obtain
                mengarahkan penggunaan atas, dan                            substantially all of the remaining benefits
                memperoleh secara substansial seluruh                       from, the goods.
                sisa manfaat dari barang.
           2.   Pelanggan memiliki kewajiban kini untuk                2.   The customer has a present obligation to
                membayar sesuai dengan syarat dan                           pay in accordance with the terms of the
                ketentuan dalam kontrak penjualan.                          sales contract.
           3.   Pelanggan telah menerima barang.                       3.   The customer has accepted the goods.
                Penjualan barang dapat tergantung pada                      Sales revenue may be subject to
                penyesuaian      berdasarkan     inspeksi                   adjustment based on the inspection of
                terhadap pengiriman oleh pelanggan.                         shipments by the customer. In these
                Dalam hal ini, penjualan diakui                             cases, sales are recognised based on the
                berdasarkan estimasi terbaik Grup                           Group’s best estimate of the grade and/or
                terhadap kualitas dan/atau kuantitas saat                   quantity at the time of shipment, and any
                pengiriman, dan penyesuaian kemudian                        subsequent adjustments are recorded
                dicatat dalam akun pendapatan. Secara                       against      revenue.   Historically, the
                historis, perbedaan antara kualitas dan                     differences between estimated and actual
                kuantitas, estimasi dan/atau aktual tidak                   grade and/or quantity have not been
                signifikan.                                                 significant.
           4.   Pelanggan telah memiliki hak kepemilikan               4.   The customer has the legal title to the
                legal atas barang.                                          goods.
           5.   Pelanggan telah menerima kepemilikan                   5.   The customer has physical possession of
                fisik atas barang.                                          the goods.

           Kewajiban pelaksanaan dapat          dipenuhi               A performance obligation may be satisfied at
           dengan cara sebagai berikut:                                the following:

           a.   Pada waktu tertentu (umumnya janji                     a.   Point in time (typically for promises to
                untuk   menyerahkan    barang  ke                           transfer goods to a customer); or
                pelanggan); atau

           b.   Sepanjang waktu (umumnya janji untuk                   b.   Over time (typically for promises to
                menyerahkan jasa ke pelanggan). Untuk                       transfer services to a customer). For a
                kewajiban pelaksanaan yang dipenuhi                         performance obligation satisfied over
                dalam suatu periode waktu, Grup memilih                     time, the Group selects an appropriate
                ukuran penyelesaian yang sesuai untuk                       measure of progress to determine the
                penentuan jumlah pendapatan yang                            amount of revenue that should be
                harus diakui karena telah terpenuhinya                      recognised as the performance obligation
                kewajiban pelaksanaan.                                      is satisfied.
Page 64
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/52 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                           30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                        (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                 unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                 (continued)

     ab.   Pengakuan      pendapatan      dan    beban          ab.   Revenue     and       expense       recognition
           (lanjutan)                                                 (continued)

           Pendapatan dari kontrak dengan pelanggan                   Revenue from contracts with customers
           (lanjutan)                                                 (continued)

           Aset kontrak adalah hak imbalan Grup dalam                 A contract asset is an entity’s right to
           pertukaran barang atau jasa yang dialihkan                 consideration in exchange for goods or
           Grup kepada pelanggan. Liabilitas kontrak                  services that the entity has transferred to a
           adalah kewajiban Grup untuk mengalihkan                    customer. A contract liability is an entity’s
           barang atau jasa kepada pelanggan di mana                  obligation to transfer goods or services to a
           Grup telah menerima imbalan (atau jumlah                   customer for which the entity has received
           imbalan yang jatuh tempo) dari pelanggan                   consideration (or an amount of consideration
           tersebut.                                                  is due) from the customer.

           i.   Penjualan batubara                                    i.   Sales of coal

                Pendapatan penjualan diakui pada setiap                    Sales revenue is recognised on each
                penjualan individu ketika pengendalian                     individual sale when control transfers to
                beralih kepada pelanggan. Pengendalian                     the customer. Control passes to the
                beralih ke pelanggan dan pendapatan                        customer and sales revenue is
                penjualan diakui ketika produk dimuat ke                   recognised when the product is loaded
                kapal di mana batubara akan dikirim ke                     onto the vessel on which the coal will be
                pelabuhan tujuan atau tempat pelanggan.                    shipped to the destination port or the
                                                                           customer’s premises.

                Grup secara umum menjual batubara                          The Group generally sells its coal
                dengan syarat Free on Board (“FOB”), di                    products on Free on Board (“FOB”) terms,
                mana Grup tidak memiliki tanggung jawab                    where the Group has no responsibility for
                untuk pengangkutan atau asuransi                           freight or insurance once control of the
                setelah pengendalian barang telah                          goods has passed at the loading port.
                berlalu di pelabuhan muat. Untuk jangka                    Under these terms, there is only one
                waktu ini hanya ada satu kewajiban                         performance obligation, for the provision
                pelaksanaan, yaitu untuk penyediaan                        of product at the point where control
                produk pada titik di mana pengendalian                     passes. In addition, the Group also sells
                lewat. Selain itu juga, Grup menjual                       coal on Cost, Insurance and Freight
                batubara dengan syarat Cost, Insurance                     (“CIF”) terms, but under the sales
                and Freight (“CIF”), tetapi berdasarkan                    agreement, the title and risk of loss of coal
                perjanjian penjualan, kepemilikan dan                      shall remain with the Group until the coal
                risiko kerugian atas batubara akan tetap                   passes the discharging port. Under this
                berada pada Grup sampai batubara                           condition, the Group considers that the
                melewati pelabuhan bongkar. Dalam                          insurance and freight costs are not
                kondisi ini, Grup menganggap bahwa                         separate performance obligations but one
                biaya asuransi dan pengangkutan bukan                      performance obligation with the sale of
                merupakan kewajiban pengendalian                           coal as the control over the coal only
                terpisah melainkan satu kewajiban                          passes to the buyer when the coal has
                pelaksanaan dengan penjualan batubara                      arrived    at   the    buyer’s      location.
                dikarenakan pengendalian atas batubara                     Accordingly, the Group does not have any
                berpindah ke pembeli pada saat batubara                    separate performance obligations for the
                tersebut sudah sampai di lokasi pembeli.                   transportation and insurance services
                Oleh karena itu Grup tidak memiliki                        provided.
                kewajiban pelaksanaan terpisah untuk
                jasa pengangkutan dan asuransi yang
                disediakan.
Page 65
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/53 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     ab.   Pengakuan         pendapatan     dan   beban          ab.   Revenue     and        expense      recognition
           (lanjutan)                                                  (continued)

           Pendapatan dari kontrak dengan pelanggan                    Revenue from contracts with customers
           (lanjutan)                                                  (continued)

           ii.    Pendapatan jasa logistik, termasuk jasa              ii.    Rendering of logistics services, including
                  sewa dan jasa lainnya                                       rental and other services

                  Grup mengakui pendapatan          atas                      The Group recognises revenue for a
                  terpenuhinya kewajiban pelaksanaan                          performance obligation satisfied over
                  dalam suatu periode hanya jika Grup                         time only if the Group can reasonably
                  dapat mengukur dengan andal atas                            measure its progress towards complete
                  penyelesaian kewajiban pelaksanaan.                         satisfaction    of   the   performance
                  Dalam keadaan tertentu, Grup mungkin                        obligation. In some circumstances, the
                  tidak dapat mengukur hasil atas                             Group may not be able to reasonably
                  kewajiban pelaksanaan secara wajar,                         measure the outcome of a performance
                  tetapi   Grup    berekspektasi   untuk                      obligation, but the Group expects to
                  memulihkan biaya yang timbul dalam                          recover the costs incurred in satisfying
                  memenuhi      kewajiban   pelaksanaan.                      the performance obligation. In those
                  Dalam keadaan tersebut, Grup mengakui                       circumstances, the Group recognises
                  pendapatan hanya sebatas biaya yang                         revenue only to the extent of the costs
                  timbul sampai Grup dapat mengukur hasil                     incurred until such time that it can
                  kewajiban pelaksanaan secara wajar.                         reasonably measure the outcome of the
                                                                              performance obligation.

                  Pendapatan dari jasa logistik, termasuk                     Revenue       from   logistics services,
                  jawa sewa dan jasa lainnya, diakui atas                     including rental and other services, is
                  dasar pekerjaan yang diselesaikan dalam                     recognised on the basis of the work
                  suatu waktu pada saat jasa tersebut                         completed over time as the services are
                  diberikan kepada pelanggan.                                 delivered to the customer.

           iii.   Perjanjian konsesi jasa                              iii.   Service concession arrangements

                  Pendapatan keuangan dari perjanjian                         Finance income from service concession
                  konsesi jasa merupakan pendapatan                           arrangements represents the interest
                  bunga dari piutang jasa konsesi yang                        income on the service concession
                  timbul dari pengaturan jasa konsesi dan                     receivable arising from a service
                  diakui dengan menggunakan metode                            concession    arrangement     and    is
                  suku bunga efektif.                                         recognised using the effective interest
                                                                              method.
Page 66
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/54 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                   2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                    (continued)

     ab.   Pengakuan        pendapatan      dan     beban          ab.   Revenue     and        expense        recognition
           (lanjutan)                                                    (continued)

           Beban                                                         Expenses

           i.    Beban dari kontrak dengan pelanggan                     i.    Expenses from contracts with customers

                 Biaya      yang      secara     langsung                      The costs that directly relate to the
                 berhubungan         dengan        kontrak,                    contract generate resources to satisfy the
                 menghasilkan sumber daya untuk                                contract (“cost to fulfil”) or are incremental
                 memenuhi      kontrak    (“biaya    untuk                     to obtaining a contract (“cost to obtain”)
                 memenuhi”) atau penambahan untuk                              and are expected to be recovered. These
                 mendapatkan kontrak (“biaya untuk                             costs    are     therefore       eligible  for
                 memperoleh”) dan diharapkan dapat                             capitalisation under SFAS No. 115 and
                 dipulihkan. Beban tersebut dengan                             recognised as assets. Such costs will be
                 demikian memenuhi syarat kapitalisasi                         amortised on a systematic basis that is
                 berdasarkan PSAK No. 115 dan diakui                           consistent with the transfer of the goods
                 sebagai      aset.    Beban      tersebut                     or services to which an asset relates.
                 diamortisasi dengan cara sistematis
                 sejalan dengan penyerahan barang atau
                 jasa yang terkait dengan aset tersebut.

           ii.   Beban-beban lainnya                                     ii.   Other expenses

                 Beban-beban lainnya diakui pada saat                          Other expenses are recognised when
                 terjadinya.                                                   they are incurred.

     ac.   Penghasilan keuangan                                    ac.   Finance income

           Penghasilan    keuangan    diakui   dengan                    Finance income is recognised using the
           menggunakan metode suku bunga efektif.                        effective interest method. When a loan or
           Ketika pinjaman atau piutang mengalami                        receivable is impaired, the Group reduces the
           penurunan nilai, Grup mengurangi nilai                        carrying amount to its recoverable amount,
           tercatatnya menjadi jumlah terpulihkannya,                    being the estimated future cash flows
           yakni estimasi arus kas masa depan yang                       discounted at the original effective interest rate
           didiskontokan berdasarkan suku bunga efektif                  of the instrument, and continues to unwind the
           awal dari instrumen tersebut, dan terus                       discount as finance income. Finance income
           mengamortisasi diskonto sebagai penghasilan                   on impaired loans and receivables is
           keuangan. Penghasilan keuangan atas                           recognised using the original effective interest
           pinjaman yang diberikan dan piutang yang                      rate.
           mengalami      penurunan     nilai   diakui
           menggunakan suku bunga efektif awal.

     ad.   Pajak penghasilan kini dan tangguhan                    ad.   Current and deferred income tax

           Beban pajak terdiri dari pajak kini dan pajak                 Tax expense comprises current and deferred
           tangguhan. Pajak diakui dalam laba rugi,                      tax. Tax is recognised in profit or loss, except
           kecuali jika pajak itu terkait dengan kejadian                to the extent that it relates to items recognised
           atau transaksi yang diakui di penghasilan                     in other comprehensive income or directly in
           komprehensif lain atau langsung diakui ke                     equity. In this case, the tax expense is
           ekuitas. Dalam hal ini, beban pajak tersebut                  recognised in other comprehensive income or
           masing-masing diakui pada penghasilan                         directly in equity, respectively.
           komprehensif lain atau secara langsung
           dicatat ke ekuitas.
Page 67
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/55 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                 2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                  (continued)

     ad.   Pajak penghasilan kini dan tangguhan                  ad.   Current and         deferred     income      tax
           (lanjutan)                                                  (continued)

           Beban pajak kini dihitung berdasarkan                       The current income tax charge is calculated
           peraturan perpajakan yang berlaku pada                      on the basis of the tax laws enacted as at the
           tanggal pelaporan keuangan, di negara                       reporting date in the countries where the
           dimana Perusahaan dan entitas anaknya                       Company and its subsidiaries operate and
           beroperasi dan menghasilkan penghasilan                     generate taxable income. Management
           kena pajak. Manajemen secara periodik                       periodically evaluates the positions taken in
           mengevaluasi posisi yang diambil dalam Surat                Annual Tax Returns with respect to situations
           Pemberitahuan Tahunan sehubungan dengan                     in which the applicable tax regulations are
           situasi dimana aturan pajak yang berlaku                    subject to interpretation. It establishes a
           membutuhkan interpretasi atas peraturan                     provision where appropriate on the basis of
           pajak yang berlaku. Jika perlu, manajemen                   the amounts expected to be paid to the tax
           menentukan provisi dibentuk berdasarkan                     authorities.
           jumlah yang diharapkan akan dibayar pada
           otoritas pajak.

           Untuk penghasilan yang menjadi subjek pajak                 For income that is subject to final tax, tax
           penghasilan final, beban pajak diakui secara                expenses are recognised proportionally with
           proporsional dengan jumlah pendapatan                       the accounting revenue recognised and
           akuntansi yang diakui dan disajikan sebagai                 presented as part of the operating expenses
           bagian dari beban operasional pada tahun                    in the current year, as this tax does not satisfy
           berjalan dikarenakan pajak tersebut tidak                   the criteria of income tax.
           memenuhi kriteria sebagai pajak penghasilan.

           Pajak penghasilan tangguhan diakui, dengan                  Deferred income tax is recognised, using the
           menggunakan metode liabilitas untuk semua                   liability method, on temporary differences
           perbedaan temporer antara dasar pengenaan                   arising between the tax bases of assets and
           pajak aset dan liabilitas dengan nilai                      liabilities and their carrying amounts in the
           tercatatnya     pada    laporan     keuangan                interim consolidated financial statements.
           konsolidasian interim. Namun, liabilitas pajak              However, deferred tax liabilities are not
           tangguhan tidak diakui jika timbul dari                     recognised if they arise from the initial
           pengakuan awal goodwill; dan pada saat                      recognition of goodwill; and deferred income
           pengakuan awal suatu aset atau liabilitas yang              tax is not accounted for if it arises from the
           timbul dari transaksi selain kombinasi bisnis               initial recognition of an asset or liability in a
           yang pada saat transaksi tersebut tidak                     transaction other than a business combination
           mempengaruhi laba rugi akuntansi maupun                     that at the time of the transaction affects
           laba rugi pajak dan tidak menimbulkan                       neither accounting nor taxable profit or loss
           perbedaan temporer kena pajak dan                           and does not give rise to equal taxable and
           perbedaan temporer dapat dikurangi dalam                    deductible temporary differences. Deferred
           jumlah yang sama. Pajak penghasilan                         income tax is determined using the tax rates
           tangguhan ditentukan menggunakan tarif                      that have been enacted or substantively
           pajak yang berlaku atau yang secara                         enacted at the end of the reporting year and
           substansial telah berlaku pada akhir tahun                  are expected to apply when the related
           pelaporan dan diharapkan diterapkan jika aset               deferred income tax asset is realised or the
           pajak penghasilan tangguhan direalisasikan                  deferred income tax liability is settled.
           atau liabilitas pajak penghasilan tangguhan
           diselesaikan.
Page 68
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/56 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

2.   INFORMASI KEBIJAKAN AKUNTANSI MATERIAL                  2.   MATERIAL ACCOUNTING POLICY INFORMATION
     (lanjutan)                                                   (continued)

     ad.   Pajak penghasilan kini dan tangguhan                   ad.   Current     and     deferred      income      tax
           (lanjutan)                                                   (continued)

           Aset pajak penghasilan tangguhan diakui                      Deferred income tax assets are recognised
           hanya jika besar kemungkinan jumlah                          only to the extent that it is probable that future
           penghasilan kena pajak di masa depan akan                    taxable profits will be available against which
           memadai untuk dikompensasi dengan                            the temporary differences can be utilised.
           perbedaan temporer yang masih dapat
           digunakan.

           Liabilitas dan aset pajak tangguhan tidak                    Deferred tax liabilities and assets are not
           diakui untuk perbedaan temporer antara nilai                 recognised     for    temporary    differences
           tercatat dan dasar pengenaan pajak atas                      between the carrying amount and tax bases
           investasi dalam ventura bersama dimana                       of investments in joint ventures where the
           Grup dapat mengendalikan waktu pembalikan                    Group is able to control the timing of the
           perbedaan temporer dan kemungkinan besar                     reversal of the temporary differences and it is
           perbedaan tersebut tidak akan dibalik di masa                probable that the differences will not be
           mendatang.                                                   reversed in the foreseeable future.

           Aset dan liabilitas pajak penghasilan                        Deferred income tax assets and liabilities are
           tangguhan dapat saling hapus jika terdapat                   offset when there is a legally enforceable right
           hak yang berkekuatan secara hukum untuk                      to offset current tax assets against current tax
           melakukan saling hapus antara aset pajak kini                liabilities.
           dengan liabilitas pajak kini.

           Selain pajak penghasilan, Grup juga mengakui                 In addition to income tax, the Group also
           bentuk pembayaran lain ke Pemerintah yang                    recognises other types of payments to the
           dihitung     berdasarkan      produksi    atau               Government that are calculated based on
           pendapatan (yaitu biaya royalti). Iuran                      production or revenue (i.e. royalty fees).
           eksploitasi dan royalti dianggap sebagai pajak               Exploitation fees and royalty fees are
           penghasilan      apabila    mereka     memiliki              accounted for as income taxes when they
           karakteristik sebagai pajak penghasilan. Hal                 have the characteristics of an income tax.
           ini   dipertimbangkan       demikian   apabila               This is considered to be the case when the
           dipersyaratkan oleh Pemerintah dan jumlah                    tax is imposed by the Government and the
           terutang didasarkan pada penghasilan kena                    amount payable is based on taxable income
           pajak daripada kuantitas fisik yang diproduksi               rather than on physical quantities produced or
           atau persentase dari penjualan. Untuk                        a percentage of revenue. For such
           perjanjian yang demikian, pajak penghasilan                  arrangements, current and deferred income
           dan pajak penghasilan ditangguhkan akan                      tax is provided on the same basis as
           dicatat sesuai dengan penjelasan di atas                     described above for other forms of taxation.
           untuk bentuk lain perpajakan. Kewajiban Grup                 The obligations of the Group arising from
           yang timbul dari ketentuan iuran eksploitasi                 exploitation fees or royalty arrangements
           atau royalti dalam PKP2B atau IUPK sebagai                   under AI’s CCA or IUPK for the Continuation
           Kelanjutan Operasi Kontrak/Perjanjian AI atau                of Contract/Agreement Operation or the AMC
           PKP2B entitas-entitas AMC, PC dan RC atau                    entities, PC and RC’s CCoWs or the IUPs of
           Izin     Usaha      Pertambangan        entitas              other mining entities in the Group do not
           pertambangan lain di dalam Grup tidak                        satisfy these criteria, therefore, they are
           memenuhi kriteria sebagai pajak penghasilan,                 recognised as current provisions and
           sehingga diakui sebagai provisi dan dicatat                  included in cost of revenue.
           sebagai beban pokok pendapatan.

     ae.   Laporan segmen                                         ae.   Segment reporting

           Segmen operasi dilaporkan dengan cara yang                   Operating segments are reported in a manner
           konsisten dengan pelaporan internal yang                     consistent with the internal reporting provided
           diberikan kepada pengambil keputusan                         to the chief operating decision-maker. The
           operasional. Direksi merupakan pengambil                     chief operating decision-maker, who is
           keputusan operasional yang bertanggung                       responsible for allocating resources and
           jawab untuk mengalokasikan sumber daya                       assessing the performance of the operating
           dan menilai kinerja segmen operasi dan                       segments and making strategic decisions,
           membuat keputusan strategis.                                 has been identified as the Board of Directors.
Page 69
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/57 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                      3.   CRITICAL ACCOUNTING              ESTIMATES       AND
     YANG PENTING                                                  JUDGEMENTS

     Penyusunan laporan keuangan konsolidasian                     The preparation of interim consolidated financial
     interim yang sesuai dengan Standar Akuntansi                  statements in conformity with Indonesian Financial
     Keuangan di Indonesia mengharuskan manajemen                  Accounting Standards requires management to
     untuk membuat estimasi dan asumsi yang                        make estimates and assumptions that affect the
     mempengaruhi jumlah aset dan liabilitas yang                  reported amounts of assets and liabilities and the
     dilaporkan dan pengungkapan aset dan liabilitas               disclosure of contingent assets and liabilities at the
     kontinjensi pada tanggal pelaporan, serta jumlah              reporting date and the reported amounts of revenue
     pendapatan dan beban selama tahun pelaporan.                  and expenses during the reporting year. Estimates,
     Estimasi, asumsi, dan pertimbangan tersebut                   assumptions and judgements are continually
     dievaluasi secara terus menerus dan berdasarkan               evaluated and are based on historical experience
     pengalaman historis dan faktor-faktor lainnya,                and other factors, including expectations of future
     termasuk harapan peristiwa di masa datang yang                events that are believed to be reasonable under the
     diyakini wajar berdasarkan kondisi yang ada.                  circumstances.

     Grup telah mengidentifikasi hal-hal berikut dimana            The Group has identified the following matters under
     diperlukan pertimbangan, estimasi dan asumsi                  which significant judgements, estimates and
     signifikan dan dimana hasil aktual dapat berbeda dari         assumptions are made and where actual results may
     estimasi tersebut jika menggunakan asumsi dan                 differ from these estimates under different
     kondisi yang berbeda dan dapat mempengaruhi                   assumptions and conditions and may materially
     secara material hasil keuangan atau posisi keuangan           affect the interim consolidated financial results or
     konsolidasian interim Grup yang dilaporkan dalam              financial position of the Group reported in future
     tahun mendatang.                                              years.

     -   Provisi atas kerugian kredit ekspektasian aset            -     Provision for ECL of financial assets
         keuangan

         Grup menggunakan matriks provisi untuk                          The Group uses a provision matrix to calculate
         menghitung kerugian kredit ekspektasian piutang                 ECL for trade receivables. The provision rates
         usaha. Tingkat provisi adalah berdasarkan hari                  are based on days past due for groupings of
         jatuh tempo atas kelompok segmen pelanggan                      various customer segments that have similar
         yang mempunyai karakteristik risiko kredit yang                 credit risk characteristics (e.g., by geography,
         serupa (misalnya berdasarkan geografi, tipe                     product type, customer type and/or rating, and
         produk, tipe dan/atau peringkat pelanggan, dan                  coverage by letters of credit and other forms).
         nilai pertanggungan dari letter of credit dan
         bentuk lain).

         Matriks provisi pada mulanya didasarkan pada                    The provision matrix is initially based on the
         tingkat gagal bayar historis Grup yang                          Group’s historical observed default rates. The
         diobservasi. Grup akan memperbaharui matriks                    Group will calibrate the matrix to adjust the
         untuk menyesuaikan pengalaman kerugian kredit                   historical credit loss experience with forward-
         historis dengan informasi forward-looking.                      looking information. For instance, if forecast
         Sebagai contoh, jika perkiraan atas kondisi                     economic conditions are expected to deteriorate
         ekonomi diperkirakan memburuk selama periode                    over the next period, which can lead to an
         depan, yang dapat menyebabkan meningkatnya                      increased number of defaults, the historical
         jumlah gagal bayar, tingkat gagal bayar historis                default rates are adjusted. At every reporting
         disesuaikan. Pada setiap tanggal pelaporan,                     date, the historically observed default rates are
         tingkat gagal bayar historis diperbaharui dan                   updated and changes in the forward-looking
         perubahan estimasi forward-looking dianalisis.                  estimates are analysed.

         Penilaian atas korelasi antara tingkat gagal bayar              The assessment of the correlation between
         historis yang diobservasi, perkiraan atas kondisi               historically observed default rates, forecast
         ekonomi dan kerugian kredit ekspektasian                        economic conditions and ECL is a significant
         merupakan estimasi yang signifikan. Jumlah                      estimate. The amount of ECL is sensitive to
         kerugian kredit ekspektasian paling dipengaruhi                 changes in circumstances and forecast
         oleh perubahan keadaan dan perkiraan kondisi                    economic conditions. The Group’s historical
         ekonomi. Pengalaman kerugian kredit historis                    credit loss experience and forecast of economic
         Grup dan perkiraan kondisi ekonomi juga                         conditions may also not be representative of a
         mungkin tidak menggambarkan gagal bayar                         customer’s actual default in the future.
         aktual pelanggan di masa yang akan datang.
Page 70
                                          PT ADARO ENERGY INDONESIA Tbk
                                     DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                   Lampiran 5/58 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                          3.   CRITICAL ACCOUNTING               ESTIMATES        AND
     YANG PENTING (lanjutan)                                           JUDGEMENTS (continued)

         -   Provisi atas kerugian kredit ekspektasian aset            -     Provision for ECL of financial assets (continued)
             keuangan (lanjutan)

             Selain provisi penurunan nilai kolektif, Grup juga              In addition to a collective impairment provision,
             menerapkan provisi khusus untuk aset                            the Group also implements specific provisions
             keuangan selain piutang. Tingkat provisi tertentu               for financial assets other than receivables. The
             dievaluasi oleh manajemen berdasarkan faktor-                   level of a specific provision is evaluated by
             faktor yang mempengaruhi kolektibilitas piutang.                management on the basis of factors that affect
             Dalam kasus ini, Grup menggunakan penilaian                     the collectability of the accounts. In these cases,
             berdasarkan fakta dan keadaan terbaik yang                      the Group uses judgement based on the best
             tersedia, termasuk namun tidak terbatas pada,                   available facts and circumstances, including but
             lamanya hubungan Grup dengan pelanggan dan                      not limited to, the length of the Group’s
             status kredit pelanggan berdasarkan laporan                     relationship with the customers and customers’
             kredit pihak ketiga dan faktor pasar yang                       credit status based on third-party credit reports
             diketahui, untuk mencatat cadangan khusus                       and known market factors, to record specific
             untuk pelanggan terhadap jumlah yang jatuh                      allowances for customers against amounts due
             tempo dalam jumlah yang diharapkan untuk                        in amounts that it expects to collect. These
             dikumpulkan. Cadangan spesifik ini dievaluasi                   specific allowance are re-evaluated and
             kembali dan disesuaikan karena informasi                        adjusted as additional information received
             tambahan yang diterima mempengaruhi jumlah                      affects the amounts estimated.
             yang diestimasi.

     -       Sewa                                                      -     Leases

             Penentuan      apakah      suatu     perjanjian                 Determining whether an arrangement is or
             mengandung unsur sewa membutuhkan                               contains a lease requires careful judgement to
             pertimbangan yang cermat untuk menilai apakah                   assess whether the arrangement conveys a
             perjanjian tersebut memberikan hak untuk                        right to obtain substantially all the economic
             mendapatkan secara substansial seluruh                          benefits from use of the asset throughout the
             manfaat ekonomis dari penggunaan aset                           period of the use and the right to direct the use
             identifikasian dan hak untuk mengarahkan                        of the asset, even if the right is not explicitly
             penggunaan aset identifikasian, bahkan jika hak                 specified in the arrangement.
             tersebut tidak dijabarkan secara eksplisit di
             perjanjian.

             Karena Grup tidak dapat dengan mudah                            Since the Group could not readily determine the
             menentukan suku bunga implisit, manajemen                       implicit rate, management uses the Group’s
             menggunakan suku bunga pinjaman inkremental                     incremental borrowing rate as a discount rate.
             Grup sebagai tingkat diskonto. Ada beberapa                     There are a number of factors to consider in
             faktor yang perlu dipertimbangkan dalam                         determining an incremental borrowing rate,
             menentukan suku bunga pinjaman inkremental,                     many of which need judgement in order to be
             yang banyak di antaranya memerlukan                             able to reliably quantify any necessary
             pertimbangan untuk dapat secara andal                           adjustments to arrive at the final discount rates.
             mengukur penyesuaian yang diperlukan untuk
             sampai pada tingkat diskonto akhir.

             Dalam menentukan suku bunga pinjaman                            In determining the incremental borrowing rate,
             inkremental, Grup mempertimbangkan faktor-                      the Group considers the following main factors:
             faktor utama berikut: risiko kredit korporat Grup,              the Group’s corporate credit risk, the lease term,
             jangka waktu sewa, jangka waktu pembayaran                      the lease payment term, the economic
             sewa, lingkungan ekonomi, waktu di mana sewa                    environment, the time at which the lease is
             dimasukkan, dan mata uang di mana                               entered into, and the currency in which the lease
             pembayaran sewa ditentukan.                                     payments are denominated.

             Dalam menentukan jangka waktu sewa, Grup                        In determining the lease term, management
             mempertimbangkan semua fakta dan keadaan                        considers all facts and circumstances that
             yang menimbulkan insentif ekonomi untuk                         create an economic incentive to exercise an
             menggunakan opsi perpanjangan, atau tidak                       extension option, or not exercise a termination
             menggunakan       opsi     penghentian.  Opsi                   option. Extension options (or periods after
             perpanjangan (atau periode setelah opsi                         termination options) are only included in the
             penghentian kontrak kerja) hanya termasuk                       lease term if the lease is reasonably certain to
             dalam jangka waktu sewa jika cukup pasti akan                   be extended (or not terminated).
             diperpanjang (atau tidak dihentikan).
Page 71
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/59 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                   3.   CRITICAL ACCOUNTING                ESTIMATES       AND
     YANG PENTING (lanjutan)                                    JUDGEMENTS (continued)

     - Sewa (lanjutan)                                          -     Leases (continued)

         Untuk sewa bangunan dan peralatan, berikut                   For leases of buildings and equipment, the
         merupakan faktor-faktor yang pada umumnya                    following factors are normally the most relevant:
         paling relevan:

            Jika terdapat penalti yang signifikan untuk                 If there are significant penalties to terminate
             mengakhiri (atau tidak memperpanjang),                       (or not extend), the Group is typically
             Grup     biasanya    cukup    pasti   untuk                  reasonably certain to extend (or not
             memperpanjang (atau tidak mengakhiri).                       terminate).
            Jika prasarana diperkirakan mempunyai nilai                 If any leasehold improvements are expected
             sisa yang signifikan, Grup biasanya cukup                    to have a significant remaining value, the
             pasti untuk memperpanjang (atau tidak                        Group is typically reasonably certain to
             mengakhiri).                                                 extend (or not terminate).
            Jika tidak, Grup mempertimbangkan faktor                    Otherwise, the Group considers other factors
             lain termasuk jangka waktu sewa historis                     including historical lease durations and the
             dan biaya dan gangguan bisnis yang timbul                    costs and business disruption required to
             untuk menggantikan aset sewa tersebut.                       replace the leased asset.

     -   Pajak penghasilan                                      -     Income taxes

         Perhitungan beban pajak penghasilan masing-                  The calculation of income tax expense for each
         masing perusahaan dalam Grup memerlukan                      company within the Group requires judgements
         pertimbangan dan asumsi dalam menentukan                     and assumptions in determining the capital
         penyisihan modal dan pengurangan beban                       allowances and deductibility of certain expenses
         tertentu selama proses pengestimasian.                       during the estimation process.

         Penghasilan yang diperoleh perusahaan-                       The revenue of the entities within the Group is
         perusahaan dalam Grup kadang-kadang dapat                    sometimes also subject to both final and non-
         dikenakan pajak final dan non-final. Penentuan               final income tax. Determining the amount of
         penghasilan yang dikenakan pajak final dan                   revenue subject to final and non-final tax as well
         non-final dan juga biaya pengurang pajak                     as expenses relating to revenue from the non-
         sehubungan     dengan      penghasilan    yang               final income tax regime requires judgements
         dikenakan    pajak     non-final   memerlukan                and estimates.
         pertimbangan dan estimasi.

         Semua pertimbangan dan estimasi yang dibuat                  All judgements and estimates made by
         manajemen seperti yang diungkapkan di atas                   management as discussed above may be
         dapat dipertanyakan oleh Direktorat Jenderal                 challenged by the Directorate General of
         Pajak (“DJP”). Sebagai akibatnya, terjadi                    Taxation (“DGT”). As a result, the ultimate tax
         ketidakpastian dalam penentuan kewajiban                     determination     becomes      uncertain.   The
         pajak. Resolusi posisi pajak yang diambil oleh               resolution of tax positions taken by the Group
         Grup dapat berlangsung bertahun-tahun dan                    can take several years to complete and, in some
         sangat sulit untuk memprediksi hasil akhirnya.               cases, it is difficult to predict the ultimate
         Apabila terdapat perbedaan perhitungan pajak                 outcome. Where the final outcome of these
         dengan jumlah yang telah dicatat, perbedaan                  matters is different from the amounts initially
         tersebut    akan   berdampak     pada    pajak               recorded, such differences will have an impact
         penghasilan dan pajak tangguhan dalam periode                on the income tax and deferred income tax
         dimana penentuan pajak tersebut dibuat.                      provision in the period in which this
                                                                      determination is made.
Page 72
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/60 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                   3.   CRITICAL ACCOUNTING               ESTIMATES        AND
     YANG PENTING (lanjutan)                                    JUDGEMENTS (continued)

     -   Pajak penghasilan (lanjutan)                           -     Income taxes (continued)

         Aset pajak tangguhan, termasuk yang timbul dari              Deferred tax assets, including those arising from
         rugi fiskal, dan perbedaan temporer lainnya,                 tax losses carried forward and temporary
         diakui hanya apabila dianggap lebih mungkin                  differences, are recognised only where it is
         daripada tidak bahwa mereka dapat diterima                   considered more likely than not that they will be
         kembali, dimana hal ini tergantung pada                      recovered, which depends on the generation of
         kecukupan pembentukan laba kena pajak di                     sufficient future taxable profits. Similar to
         masa depan. Sama seperti “penurunan nilai aset               “impairment of non-financial assets” discussed
         non-keuangan” didiskusikan di bawah, asumsi                  below, assumptions about the generation of
         atas pembentukan laba kena pajak sangat                      future taxable profits are heavily affected by
         dipengaruhi oleh estimasi dan asumsi                         management’s estimates and assumptions
         manajemen atas tingkat produksi yang                         regarding the expected production levels, sales
         diharapkan, volume penjualan, harga komoditas,               volumes, commodity prices, etc, which are
         dan lain-lain, yang mana terpapar risiko dan                 subject to risk and uncertainty, and hence there
         ketidakpastian, sehingga ada kemungkinan                     is a possibility that changes in circumstances will
         perubahan estimasi dan asumsi akan mengubah                  alter the projected future taxable profits.
         proyeksi laba kena pajak di masa mendatang.

     -   Provisi pembongkaran, rehabilitasi, reklamasi          -     Provision      for    decommissioning,       mine
         dan penutupan tambang                                        rehabilitation, reclamation and closure

         Seperti yang dijelaskan pada Catatan 41 atas                 As discussed in Note 41 to these interim
         laporan keuangan konsolidasian interim ini,                  consolidated financial statements, there are
         terdapat beberapa Peraturan Pemerintah dan                   several Government and Ministerial Regulations
         Kementerian       yang    mengatur    kewajiban              dealing with rehabilitation, reclamation and mine
         rehabilitasi, reklamasi, dan penutupan tambang               closure obligations of mining companies
         untuk perusahaan tambang yang beroperasi di                  operating in Indonesia. Therefore, AI, JC, LC,
         Indonesia. Oleh karena itu, AI, JC, LC, MC,                  MC, SCM, LSA and MIP have calculated
         SCM, LSA, dan MIP menghitung provisi                         provisions for mine rehabilitation, reclamation
         rehabilitasi, reklamasi, dan penutupan tambang               and closure based on these regulations.
         atas dasar peraturan-peraturan tersebut.

         Seperti yang dijelaskan pada Catatan 2s laporan              As discussed in Note 2s to these interim
         keuangan konsolidasian interim ini, biaya                    consolidated financial statements, reclamation
         reklamasi, rehabilitasi, dan lingkungan yang                 fee,      rehabilitation     and     environmental
         berkaitan dengan pemulihan atas area                         expenditure to be incurred related to the
         terganggu selama tahap produksi dibebankan                   remediation of disturbed areas during the
         pada beban pokok pendapatan pada saat                        production phase are charged to cost of revenue
         kewajiban berkaitan dengan pemulihan tersebut                when the obligation arising from the disturbance
         timbul selama proses penambangan. Reklamasi                  occurs as extraction progresses. The
         area terganggu dan pembongkaran aset                         reclamation       of     disturbed    areas    and
         tambang dan aset-aset berumur panjang lainnya                decommissioning of mining assets and other
         akan dilakukan selama beberapa tahun                         long-lived assets will be undertaken several
         mendatang dan persyaratan atas reklamasi ini                 years into the future and precise requirements
         terus berubah untuk memenuhi ekspektasi                      are constantly changing to satisfy political,
         politik, lingkungan, keamanan, dan publik.                   environmental, safety and public expectations.
         Dengan demikian waktu pelaksanaan dan                        As such, the timing and amounts of future cash
         jumlah arus kas di masa mendatang yang                       flows required to settle the obligations at each of
         dibutuhkan untuk memenuhi kewajiban pada                     the reporting dates are subject to significant
         setiap tanggal pelaporan dipengaruhi oleh                    uncertainty. The key assumptions used in
         ketidakpastian yang signifikan. Asumsi utama                 determining the provision for decommissioning,
         yang digunakan untuk menentukan provisi                      mine rehabilitation, reclamation and closure
         pembongkaran, rehabilitasi, reklamasi dan                    included the life of operation, estimated future
         penutupan tambang termasuk umur operasi,                     costs, timing of activities, discount rates, and
         perkiraan biaya di masa mendatang, waktu                     inflation rates.
         kegiatan, tarif diskonto, dan tingkat inflasi.
Page 73
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/61 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                      3.   CRITICAL ACCOUNTING               ESTIMATES       AND
     YANG PENTING (lanjutan)                                       JUDGEMENTS (continued)

     -   Estimasi cadangan                                         -     Reserve estimation

         Cadangan batubara adalah bagian yang dapat                      Coal reserves are the economically mineable
         ditambang secara ekonomis dari sumber daya                      part of coal resources that result in an estimated
         batubara yang menghasilkan perkiraan tonase                     tonnage and quality which, in the opinion of the
         dan kualitas yang, menurut pendapat orang yang                  competent person making the estimates, can be
         berkompeten yang membuat perkiraan, dapat                       the basis of a technically and economically
         menjadi dasar proyek yang layak secara teknis                   viable project, after taking account of material
         dan        ekonomis,       setelah     dengan                   relevant “Modifying Factors”.
         mempertimbangkan “Faktor Pengubah” yang
         relevan secara material.

         Faktor Pengubah adalah pertimbangan yang                        Modifying Factors are considerations used to
         digunakan untuk mengkonversi sumber daya                        convert coal resources to coal reserves. These
         batubara menjadi cadangan batubara. Ini                         include, but are not restricted to, mining factors
         termasuk, namun tidak terbatas pada, faktor                     (among others geological and technical factors
         pertambangan (antara lain faktor geologi dan                    including quantities and qualities, production
         teknis termasuk kuantitas dan kualitas, teknik                  techniques and stripping ratios based on deposit
         produksi dan nisbah kupas berdasarkan karakter                  character), processing factors, infrastructure
         deposit), faktor pengolahan, faktor infrastruktur,              factors, economic factors (among others
         faktor ekonomi (antara lain biaya produksi, biaya               production cost, transport cost, future capital
         transportasi, belanja modal masa depan,                         expenditure, mine closure obligations and
         kewajiban penutupan tambang dan nilai tukar),                   exchange rates), marketing factors (among
         faktor pemasaran (antara lain permintaan                        others commodity demand and commodity
         komoditas dan harga komoditas), faktor hukum,                   prices), legal, environmental, social and
         lingkungan, sosial dan pemerintah.                              governmental factors.

         Grup menentukan dan melaporkan cadangan                         The Group determines and reports its coal
         batubaranya berdasarkan prinsip yang terdapat                   reserves under the principles of the Australasian
         dalam Australasian Joint Ore Reserves                           Joint Ore Reserves Committee (the “JORC”)
         Committee untuk Pelaporan Hasil Eksplorasi,                     which is a member of the Committee for Mineral
         Sumber Daya Mineral dan Cadangan Bijih                          Reserves International Reporting Standards (the
         (“JORC”) yang merupakan anggota Komite                          “CRIRSCO”).
         untuk Standar Pelaporan Cadangan Mineral
         Internasional (“CRIRSCO”).

         Memperkirakan jumlah dan/atau nilai kalori                      Estimating the quantity and/or calorific value of
         cadangan batubara membutuhkan ukuran,                           coal reserves requires the size, shape and depth
         bentuk, dan kedalaman lapisan batubara atau                     of coal seams or fields to be determined by
         lapangan yang akan ditentukan dengan                            analysing geological data such as drilling
         menganalisis data geologi seperti “uji petik”                   samples. This process may require complex and
         (sampel) pengeboran. Proses ini mungkin                         difficult geological judgements to interpret the
         memerlukan pertimbangan geologi yang                            data.
         kompleks dan sulit untuk menginterpretasikan
         data.
Page 74
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/62 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                     3.   CRITICAL ACCOUNTING               ESTIMATES        AND
     YANG PENTING (lanjutan)                                      JUDGEMENTS (continued)

     -   Estimasi cadangan (lanjutan)                             -     Reserve estimation (continued)

         Karena asumsi ekonomi yang digunakan untuk                     Because the economic assumptions used to
         memperkirakan cadangan berubah dari tahun ke                   estimate reserves change from year to year and
         tahun dan karena data geologi tambahan yang                    because additional geological data is generated
         dihasilkan selama operasi, perkiraan cadangan                  during the course of operations, estimates of
         dapat berubah dari tahun ke tahun. Perubahan                   reserves may change from year to year.
         cadangan       yang     diestimasikan    dapat                 Changes in estimated reserves may affect the
         mempengaruhi hasil dan posisi keuangan                         Group’s interim consolidated financial results
         konsolidasian interim Grup dalam berbagai cara,                and financial position in a number of ways,
         diantaranya:                                                   including the following:

          Nilai tercatat aset dapat terpengaruh akibat                    Asset carrying amounts may be affected due
           perubahan estimasi arus kas masa depan.                          to changes in the estimated future cash
                                                                            flows.
          Penyusutan dan amortisasi yang dibebankan                       Depreciation and amortisation charged to
           ke dalam laba rugi dapat berubah dimana                          profit or loss may change where such
           beban-beban           tersebut       ditentukan                  charges are determined based on the unit-
           berdasarkan metode unit produksi, atau                           of-production method or where the economic
           dimana masa manfaat ekonomi umur aset                            useful lives of assets change.
           berubah.
          Provisi penutupan tambang dapat berubah                         Provision for mine closure may change
           apabila terjadi perubahan dalam perkiraan                        where changes in estimated reserves affect
           cadangan yang mempengaruhi ekspektasi                            expectations about the timing or cost of
           tentang waktu atau biaya kegiatan ini.                           these activities.
          Nilai tercatat aset/liabilitas pajak tangguhan                  The carrying amount of deferred tax
           dapat berubah karena perubahan estimasi                          assets/liabilities may change due to changes
           atas kemungkinan terpulihkannya manfaat                          in estimates of the likelihood of the
           pajak.                                                           recoverability of the tax benefits.

     -   Estimasi masa manfaat aset tetap                         -     Estimating useful lives of fixed assets

         Grup mengestimasi masa manfaat ekonomis                        The Group estimates the useful lives of its fixed
         aset tetap berdasarkan utilisasi dari aset yang                assets based on expected asset utilisation
         diharapkan dan didukung dengan rencana dan                     supported by business plans and strategies that
         strategi usaha dan ekspektasi perilaku pasar.                  also consider the expected market behaviour.
         Estimasi dari masa manfaat aset tetap adalah                   The estimation of the useful lives of fixed assets
         berdasarkan penelaahan Grup terhadap praktek                   is based on the Group’s assessment of industry
         industri, evaluasi teknis internal dan pengalaman              practice, internal technical evaluation and
         untuk aset yang setara. Estimasi masa manfaat                  experience with similar assets. The estimated
         ditelaah minimal setiap akhir periode pelaporan                useful lives are reviewed at least at each
         dan diperbarui jika ekspektasi berbeda dari                    financial period-end and are updated if
         estimasi sebelumnya dikarenakan pemakaian                      expectations differ from previous estimates due
         dan kerusakan fisik, keusangan secara teknis                   to physical wear and tear, technical or
         atau komersial dan hukum atau pembatasan lain                  commercial obsolescence and legal or other
         atas penggunaan dari aset. Akan tetapi, ada                    limitations on the use of the assets. However, it
         kemungkinan bahwa hasil di masa depan dari                     is possible that future results of operations could
         operasi dapat dipengaruhi secara material oleh                 be materially affected by changes in the
         perubahan-perubahan dalam estimasi yang                        estimates brought about by changes in the
         diakibatkan oleh perubahan faktor-faktor yang                  factors mentioned above.
         disebutkan di atas.
Page 75
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/63 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                        3.   CRITICAL ACCOUNTING               ESTIMATES        AND
     YANG PENTING (lanjutan)                                         JUDGEMENTS (continued)

     -   Penurunan nilai aset non-keuangan dan goodwill              -     Impairment of non-financial assets and goodwill

         Jumlah nilai yang dapat dipulihkan kembali dari                   The recoverable amount of a cash-generating
         sebuah aset atau kelompok aset penghasil kas,                     asset or group of assets, including goodwill, is
         termasuk goodwill, diukur berdasarkan nilai yang                  measured at the higher of its fair value less costs
         lebih tinggi antara nilai wajar dikurangi biaya                   of disposal or value in use. The determination of
         untuk menjual atau nilai pakai. Penentuan nilai                   fair value less costs of disposal or value in use
         wajar dikurangi biaya untuk menjual atau nilai                    requires management to make estimates and
         pakai mewajibkan manajemen untuk membuat                          assumptions regarding expected production
         estimasi dan asumsi atas tingkat produksi yang                    levels, sales volumes, commodity prices
         diharapkan, volume penjualan, harga komoditas                     (considering current and historical prices, price
         (mempertimbangkan harga saat ini dan harga                        trends and related factors), reserves (see
         masa lalu, tren harga, dan faktor-faktor terkait),                “Reserve estimation”), operating costs, inflation
         cadangan (lihat “Estimasi cadangan”), biaya                       rate, projected cash flows and post-tax discount
         operasi, tingkat inflasi, proyeksi arus kas dan                   rates. These estimates and assumptions are
         tingkat diskonto setelah pajak, belanja modal di                  subject to risk and uncertainty, and hence there
         masa depan dan jangka waktu konsesi                               is a possibility that changes in circumstances will
         pertambangan. Estimasi dan asumsi ini terpapar                    alter these projections, which may have an
         risiko dan ketidakpastian, sehingga terdapat                      impact on the recoverable amount of the assets
         kemungkinan perubahan situasi yang dapat                          and goodwill. In such circumstances, some or all
         mengubah proyeksi ini, sehingga dapat                             of the carrying amounts of the assets and
         mempengaruhi nilai aset yang dapat dipulihkan                     goodwill may be further impaired or the
         kembali dari aset dan goodwill. Dalam keadaan                     impairment charges may be reduced with the
         seperti itu, sebagian atau seluruh nilai tercatat                 impact being recorded in profit or loss.
         aset dan goodwill mungkin akan mengalami
         penurunan nilai lebih lanjut atau terjadi
         pengurangan rugi penurunan nilai yang
         dampaknya akan dicatat dalam laba rugi.

     -   Estimasi nilai wajar                                        -     Fair value estimation

         Ketika nilai wajar aset keuangan dan liabilitas                   When the fair values of financial assets and
         keuangan dicatat dalam laporan posisi                             financial liabilities recorded in the interim
         keuangan konsolidasian interim tidak dapat                        consolidated statements of financial position
         diukur berdasarkan harga dikutip dalam pasar                      cannot be measured based on quoted prices in
         aktif, nilai wajar ditentukan menggunakan teknik                  active markets, their fair value is measured
         penilaian yang mencakup model Diskonto Arus                       using     valuation     techniques       including
         Kas (“DAK”). Input untuk model ini diambil dari                   Discounted Cash Flow (“DCF”) models. The
         pasar yang dapat diobservasi dimana                               inputs to these models are taken from
         memungkinkan, tetapi tidak mudah dilakukan,                       observable markets where possible, but where
         membutuhkan tingkat pertimbangan dalam                            this is not feasible, a degree of judgement is
         menentukan nilai wajar tersebut. Pertimbangan                     required in establishing fair values. Judgements
         mencakup pertimbangan atas input seperti risiko                   include considerations of inputs such as liquidity
         likuiditas, risiko kredit dan volatilitas. Perubahan              risk, credit risk and volatility. Changes in
         asumsi mengenai faktor-faktor tersebut dapat                      assumptions about these factors could affect
         mempengaruhi nilai wajar instrumen keuangan                       the reported fair value of financial instruments.
         yang dilaporkan. Lihat Catatan 43(2) untuk                        Refer to Note 43(2) for further disclosures.
         informasi lebih lanjut.
Page 76
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/64 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN AKUNTANSI                     3.   CRITICAL ACCOUNTING                 ESTIMATES        AND
     YANG PENTING (lanjutan)                                      JUDGEMENTS (continued)

     -     Kepentingan dalam pengaturan bersama                   -     Interests in joint arrangements

           Pertimbangan diperlukan untuk menentukan                     Judgement is required to determine when the
           ketika Grup memiliki pengendalian bersama,                   Group has joint control, which requires an
           yang membutuhkan penilaian mengenai                          assessment of the relevant activities and when
           aktivitas yang relevan dan ketika keputusan                  the decisions in relation to those activities
           yang berkaitan dengan aktivitas tersebut                     require unanimous consent. The Group has
           membutuhkan persetujuan dengan suara bulat.                  determined that the relevant activities for its joint
           Grup menentukan bahwa aktivitas yang relevan                 arrangements are those relating to the financial,
           untuk pengaturan bersama adalah aktivitas yang               operating and capital decisions of the
           berkaitan    dengan   keputusan     keuangan,                arrangement.
           operasional dan modal dari pengaturan tersebut.

           Pertimbangan      juga     diperlukan     untuk              Judgement is also required to classify a joint
           mengklasifikasikan     pengaturan     bersama                arrangement as either a joint operation or a joint
           sebagai pengendalian bersama atau ventura                    venture. Classifying the arrangement requires
           bersama. Pengklasifikasian pengaturan tersebut               the Group to assess its rights and obligations
           mengharuskan Grup untuk menilai hak dan                      arising from the arrangement. Specifically, it
           kewajiban yang timbul dari pengaturan tersebut.              considers:
           Secara khusus, Grup mempertimbangkan:

              Struktur dari pengaturan bersama - apakah                   The structure of the joint arrangement
               dibentuk melalui kendaraan terpisah.                         whether it is structured through a separate
                                                                            vehicle.
              Ketika pengaturan tersebut terstruktur                      When the arrangement is structured through
               melalui kendaraan terpisah, Grup juga                        a separate vehicle, the Group also
               mempertimbangkan hak dan kewajiban yang                      considers the rights and obligations arising
               timbul dari:                                                 from:

               a. Bentuk legal dari kendaraan terpisah;                     a. The legal form of the separate vehicle;
               b. Persyaratan dari perjanjian kontraktual;                  b. The     terms    of    the    contractual
                  dan                                                          arrangement; and
               c. Fakta dan kondisi lainnya, jika relevan.                  c. Other relevant facts and circumstances.

         Penilaian ini sering membutuhkan pertimbangan                  This assessment often requires significant
         yang signifikan. Kesimpulan yang berbeda                       judgement. A different conclusion on joint control
         mengenai pengendalian bersama dan apakah                       and on whether the arrangement is a joint
         suatu pengaturan adalah sebuah operasi bersama                 operation or a joint venture, may materially affect
         atau ventura bersama, dapat memiliki dampak                    the interim consolidated financial statements.
         material terhadap laporan keuangan konsolidasian
         interim.
Page 77
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                  Lampiran 5/65 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

3.   ESTIMASI DAN PERTIMBANGAN                 AKUNTANSI        3.    CRITICAL ACCOUNTING               ESTIMATES         AND
     YANG PENTING (lanjutan)                                          JUDGEMENTS (continued)

     -     Kepentingan dalam pengaturan bersama (lanjutan)            -     Interests in joint arrangements (continued)

           Grup memiliki pengaturan bersama yang                            The Group has joint arrangements that are
           terstruktur    melalui      ventura      bersama,                structured through joint ventures, being
           PT Bhimasena Power Indonesia (“BPI”),                            PT Bhimasena Power Indonesia (“BPI”),
           PT Tanjung Power Indonesia (“TPI”), Kestrel Coal                 PT Tanjung Power Indonesia (“TPI”), Kestrel
           Group Pty Ltd (“Kestrel”), PT Dumai Tirta Persada                Coal Group Pty Ltd (“Kestrel”), PT Dumai Tirta
           (“DTP”), PT Grenex Tirta Mandiri (“GTM”), PT                     Persada (“DTP”), PT Grenex Tirta Mandiri
           Bhakti Energi Persada dan entitas anaknya                        (“GTM”), PT Bhakti Energi Persada and its
           (“BEP”), PT Kayan Hydropower Nusantara                           subsidiaries (“BEP”), PT Kayan Hydropower
           (“KHN”), TCU dan PT Bayu Energi Listrik Lestari                  Nusantara (“KHN”), TCU and PT Bayu Energi
           dan entitas anaknya (“BELL”). Struktur dan                       Listrik Lestari and its subsidiary (“BELL”). These
           persyaratan     dari     perjanjian    kontraktual               structures and the terms of the contractual
           mengindikasikan bahwa Grup memiliki hak atas                     arrangements indicate that the Group has rights
           aset bersih dari pengaturan bersama tersebut.                    to the net assets of the arrangements. The
           Grup menilai fakta dan kondisi lain yang berkaitan               Group also assessed the other facts and
           dengan pengaturan ini dan menyimpulkan bahwa                     circumstances relating to these arrangements
           pengaturan tersebut merupakan sebuah ventura                     and concluded that the arrangements are joint
           bersama. Lihat Catatan 11 untuk informasi lebih                  ventures. Refer to Note 11 for further
           lanjut.                                                          information.


4.   KAS DAN SETARA KAS                                         4.    CASH AND CASH EQUIVALENTS

                                           30 September          31 Desember/
                                               2024             December 2023

     Kas                                                186                  105                              Cash on hand

     Kas di bank - Rupiah                                                                         Cash in banks - Rupiah
     PT Bank DBS Indonesia                          159,041                 4,507                  PT Bank DBS Indonesia
     PT Bank Rakyat Indonesia                                                                    PT Bank Rakyat Indonesia
         (Persero) Tbk (“BRI”)                      137,468                68,776                   (Persero) Tbk (“BRI”)
     PT Bank Mandiri (Persero) Tbk                                                           PT Bank Mandiri (Persero) Tbk
      (“Bank Mandiri”)                               21,089               323,211                        (“Bank Mandiri”)
     PT Bank Permata Tbk                             20,191                18,876                    PT Bank Permata Tbk
     PT Bank UOB Indonesia                           13,426                31,089                 PT Bank UOB Indonesia
     PT Bank OCBC NISP Tbk                            7,888                35,957              PT Bank OCBC NISP Tbk
     PT Bank Negara Indonesia                                                                   PT Bank Negara Indonesia
         (Persero) Tbk (“BNI”)                        7,671                 8,309                   (Persero) Tbk (“BNI”)
     PT Bank BTPN Tbk                                 5,518                13,406                      PT Bank BTPN Tbk
     Lain-lain                                        3,057                 1,175                                   Others

     Total rekening Rupiah                         375,349                505,306                     Total Rupiah accounts
Page 78
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/66 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

4.   KAS DAN SETARA KAS (lanjutan)                           4.    CASH AND CASH EQUIVALENTS (continued)

                                         30 September         31 Desember/
                                             2024            December 2023

     Kas di bank - Dolar AS                                                             Cash in banks - US Dollars
     Bank Mandiri                                922,533            735,335                           Bank Mandiri
     BRI                                         701,761            684,738                                    BRI
     BNI                                         476,793            204,046                                    BNI
     PT Bank UOB Indonesia                       200,234            212,299                 PT Bank UOB Indonesia
     PT Bank DBS Indonesia                        87,906            103,813                 PT Bank DBS Indonesia
     PT Bank BTPN Tbk                             72,065            124,261                     PT Bank BTPN Tbk
     DBS Bank Ltd                                 40,101             53,472                          DBS Bank Ltd
     PT Bank OCBC NISP Tbk                        34,344             24,093               PT Bank OCBC NISP Tbk
     PT Bank Maybank Indonesia Tbk                34,139             52,764         PT Bank Maybank Indonesia Tbk
     United Overseas Bank Ltd                     12,582             10,518               United Overseas Bank Ltd
     Sumitomo Mitsui Banking                                                               Sumitomo Mitsui Banking
        Corporation                                3,979             17,080                          Corporation
     PT Bank Permata Tbk                           1,450             63,010                   PT Bank Permata Tbk
     Lain-lain                                     2,608              2,272                                 Others

     Total rekening Dolar AS                   2,590,495          2,287,701                Total US Dollars accounts

     Kas di bank - Mata uang lain                                                 Cash in banks - Other currencies
     Lain-lain                                       919              1,327                                 Others

     Total kas di bank                         2,966,763          2,794,334                      Total cash in banks

     Deposito berjangka - Rupiah                                                            Time deposits - Rupiah
     BRI                                         121,302            116,040                                    BRI
     PT Bank OCBC NISP Tbk                         6,937             13,421                PT Bank OCBC NISP Tbk
     Lain-lain                                     1,486                649                                  Others

     Total deposito berjangka Rupiah             129,725            130,110               Total Rupiah time deposits

     Deposito berjangka - Dolar AS                                                      Time deposits - US Dollars
     BRI                                          70,000             10,000                                   BRI
     DBS Bank Ltd                                 20,963             30,173                         DBS Bank Ltd
     PT Bank QNB Indonesia Tbk                    12,612             50,256             PT Bank QNB Indonesia Tbk
     BNI                                               -             49,205                                   BNI
     Sumitomo Mitsui Banking
        Corporation                                    -             55,000     Sumitomo Mitsui Banking Corporation
     PT Bank Permata Tbk                               -            168,040                   PT Bank Permata Tbk
     United Overseas Bank Ltd                          -             23,000              United Overseas Bank Ltd
     Lain-lain                                       100              1,009                                 Others

     Total deposito berjangka
        Dolar AS                                 103,675            386,683            Total US Dollars time deposits

     Deposito berjangka -
        Mata uang lain                                                            Time deposits - Other currencies
     Lain-lain                                       481                  -                                 Others

     Total deposito berjangka                    233,881            516,793                       Total time deposits

     Total                                     3,200,830          3,311,232                                    Total

     Tidak ada kas dan setara kas yang dimiliki oleh pihak         There are no cash and cash equivalents held with
     berelasi.                                                     related parties.
Page 79
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/67 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

4.   KAS DAN SETARA KAS (lanjutan)                           4.    CASH AND CASH EQUIVALENTS (continued)

     Deposito berjangka yang dimiliki Grup memiliki jatuh          Time deposits owned by the Group have maturity
     tempo kurang dari tiga bulan sejak penempatannya dan          dates less than three months since the placement
     tidak dijaminkan.                                             and are unsecured.

     Rekening bank milik KAI, KPI dan ATB dijadikan                The bank accounts owned by KAI, KPI and ATB were
     jaminan pinjaman bank.                                        pledged for bank loans.

     Tingkat suku bunga kontraktual deposito berjangka             The contractual interest rates on time deposits during
     selama periode/tahun berjalan adalah sebagai berikut:         the period/year were as follows:

                                         30 September         31 Desember/
                                             2024            December 2023

     Rupiah                              5.00% - 6.25%       2.10% - 6.25%                                       Rupiah
     Dolar AS                            4.79% - 6.35%       2.00% - 6.05%                                    US Dollars

     Kas dan setara kas termasuk kas yang ditempatkan ke           Cash and cash equivalents include the cash held in
     dalam rekening khusus devisa hasil ekspor dari sumber         a special account for foreign exchange export
     daya alam sesuai dengan Peraturan Pemerintah                  proceeds from natural resources in accordance with
     No. 36/2023 (Catatan 40ab).                                   the Government Regulation No. 36/2023 (Note
                                                                   40ab).


5.   KAS DAN DEPOSITO BERJANGKA YANG DIBATASI                5.    RESTRICTED CASH AND TIME DEPOSITS
     PENGGUNAANNYA

                                         30 September         31 Desember/
                                             2024            December 2023

     Kas di bank - Dolar AS                                                                 Cash in bank - US Dollars
     PT Bank Permata Tbk                           3,972               4,054                    PT Bank Permata Tbk

     Deposito berjangka - Rupiah                                                              Time deposits - Rupiah
     BRI                                           4,590               3,666                                      BRI
     Bank Mandiri                                  2,037               2,092                              Bank Mandiri
     BNI                                           1,322                 775                                      BNI
     PT Bank Pembangunan Daerah                                                         PT Bank Pembangunan Daerah
        Sumatera Selatan                                                                          Sumatera Selatan
        dan Bangka Belitung (“BPD”)                  300                387              and Bangka Belitung (“BPD”)

     Total deposito berjangka Rupiah               8,249               6,920                 Total Rupiah time deposits

     Deposito berjangka - Dolar AS                                                         Time deposits - US Dollars
     BRI                                          31,416             30,290                                      BRI
     Bank Mandiri                                 12,416             15,042                             Bank Mandiri

     Total deposito berjangka
        Dolar AS                                  43,832             45,332              Total US Dollars time deposits

     Total deposito berjangka                     52,081             52,252                          Total time deposits

     Total                                        56,053             56,306                                        Total

     Dikurangi: bagian lancar                      3,972              4,054                      Less: current portion

     Bagian tidak lancar                          52,081             52,252                        Non-current portion
Page 80
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/68 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

5.   KAS DAN DEPOSITO BERJANGKA                     YANG      5.    RESTRICTED       CASH     AND    TIME    DEPOSITS
     DIBATASI PENGGUNAANNYA (lanjutan)                              (continued)

     Tingkat suku bunga kontraktual deposito berjangka              The contractual interest rates on the restricted time
     yang dibatasi penggunaannya selama periode/tahun               deposits during the period/year were as follows:
     berjalan adalah sebagai berikut:

                                         30 September          31 Desember/
                                             2024             December 2023

     Rupiah                              1.80% - 6.25%        2.25% - 6.25%                                      Rupiah
     Dolar AS                            1.00% - 4.00%        0.20% - 2.00%                                   US Dollars

     Tidak ada kas dan deposito berjangka yang dibatasi             There are no restricted cash and time deposits held
     penggunaannya dengan pihak berelasi.                           with related parties.

     Kas di bank yang dibatasi penggunaannya                        The restricted cash in bank is placed as a debt
     ditempatkan sebagai debt service reserve account               service reserve account (“DSRA”) in PT Bank
     (“DSRA”) pada PT Bank Permata Tbk berkaitan                    Permata Tbk related to a US$80,000 facility
     dengan perjanjian fasilitas AS$80.000 (Catatan 19f).           agreement (Note 19f). The restricted time deposits
     Deposito berjangka yang dibatasi penggunaannya                 are placed as security for mine rehabilitation,
     ditempatkan sebagai jaminan rehabilitasi tambang,              reclamation and post-mining guarantees with Bank
     reklamasi dan pascatambang pada Bank Mandiri, BRI,             Mandiri, BRI, BNI and BPD (Note 41), including
     BNI dan BPD (Catatan 41), termasuk bunga yang                  rolled-over interest on maturity.
     diperpanjang otomatis pada saat jatuh tempo.


6.   INVESTASI LAIN-LAIN                                       6.   OTHER INVESTMENTS

     Rincian seluruh investasi lain-lain yang dimiliki oleh         Details of other investments owned by the Group are
     Grup adalah sebagai berikut:                                   as follows:

                                         30 September          31 Desember/
                                             2024             December 2023

     Aset keuangan pada nilai wajar
       melalui penghasilan
       komprehensif lain                         505,849             487,691                  Financial assets at FVOCI
     Aset keuangan pada nilai wajar
       melalui laba rugi                          66,515              61,768                  Financial assets at FVTPL

     Total                                       572,364             549,459                                        Total

     Dikurangi: bagian lancar                     64,016              48,271                     Less: current portion

     Bagian tidak lancar                         508,348             501,188                        Non-current portion

     a. Aset keuangan pada nilai wajar melalui                      a. Financial assets at FVOCI
        penghasilan komprehensif lain

         Aset keuangan pada nilai wajar melalui                         Financial assets at FVOCI represent investment
         penghasilan komprehensif lain terdiri dari                     in unlisted equity securities with expected
         investasi pada efek ekuitas yang tidak                         realisation of more than one year.
         diperdagangkan di bursa dengan ekspektasi
         realisasi lebih dari satu tahun.
Page 81
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/69 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

6.   INVESTASI LAIN-LAIN (lanjutan)                            6.   OTHER INVESTMENTS (continued)

     a.   Aset keuangan pada nilai wajar melalui                    a. Financial assets at FVOCI (continued)
          penghasilan komprehensif lain (lanjutan)

          Mutasi nilai wajar atas aset keuangan pada nilai             Fair value movements in financial assets at
          wajar melalui penghasilan komprehensif lain                  FVOCI for the nine-month period ended
          untuk periode sembilan bulan yang berakhir pada              30 September 2024 with net losses amounting
          tanggal 30 September 2024 dengan kerugian neto               to US$140 (for the nine-month period ended
          sebesar AS$140 (untuk periode sembilan bulan                 30 September 2023: net gains of US$10,194)
          yang berakhir pada tanggal 30 September 2023:                are presented in other comprehensive income
          keuntungan neto sebesar AS$10.194) disajikan                 for the period.
          pada penghasilan komprehensif lain periode
          berjalan.

          Penghasilan bunga efektif yang diperoleh dari                Effective interest income earned on financial
          aset keuangan pada nilai wajar melalui                       assets at FVOCI for the nine-month period
          penghasilan komprehensif lain selama untuk                   ended 30 September 2024 amounted to US$nil
          periode sembilan bulan yang berakhir pada                    (for the nine-month period ended 30 September
          tanggal 30 September 2024 adalah sebesar                     2023: US$184) which was presented as part of
          AS$nihil (untuk periode sembilan bulan yang                  “Finance income” in the interim consolidated
          berakhir pada tanggal 30 September 2023:                     statements of profit or loss.
          AS$184) yang disajikan sebagai bagian dari
          “Penghasilan keuangan” pada laporan laba rugi
          konsolidasian interim.

          Nilai wajar efek yang tidak diperdagangkan di                The fair values of unlisted securities are based
          bursa dihitung dari arus kas yang didiskontokan              on discounted cash flows using a rate based on
          dengan menggunakan suku bunga pasar dan                      the market interest rate and risk premium
          premi risiko yang spesifik atas efek yang tidak              specific to the unlisted securities.
          diperdagangkan tersebut.

          Manajemen berpendapat bahwa tidak terdapat                   The management is of the opinion that there are
          kejadian-kejadian atau perubahan keadaan yang                no events or changes in circumstances that
          mengindikasikan adanya bukti objektif penurunan              indicate a permanent decline in the fair value of
          nilai wajar aset keuangan pada nilai wajar melalui           the financial assets at FVOCI. Therefore, no
          penghasilan komprehensif lain, sehingga, tidak               provision for impairment in the value of the
          diperlukan cadangan penurunan nilai atas aset                above financial assets is necessary.
          keuangan tersebut.

     b.   Aset keuangan pada nilai wajar melalui laba               b. Financial assets at FVTPL
          rugi

          Aset keuangan pada nilai wajar melalui laba rugi             Financial   assets      at   FVTPL      represent
          terdiri dari investasi saham pada perusahaan yang            investments in listed share on a stock exchange.
          diperdagangkan di bursa efek.

          Mutasi nilai wajar atas aset keuangan pada nilai             Fair value movements in financial assets at
          wajar melalui laba rugi untuk periode sembilan               FVTPL for the nine-month period ended
          bulan yang berakhir pada tanggal 30 September                30 September 2024 with net gains amounting to
          2024 dengan keuntungan neto sebesar AS$3.810                 US$3,810 ((for the nine-month period ended
          (untuk periode sembilan bulan yang berakhir pada             30 September 2023: net losses amounting to
          tanggal 30 September 2023: kerugian neto                     US$27,402), are presented as part of “Other
          sebesar AS$27.402) disajikan sebagai bagian dari             income/(expenses), net” in the interim
          “Pendapatan/(beban) lain-lain, neto” pada laporan            consolidated statements of profit or loss.
          laba rugi konsolidasian interim.

          Nilai wajar efek yang diperdagangkan di bursa                The fair values of listed securities are based on
          dihitung berdasarkan harga dikutip dalam pasar               quoted prices in active markets.
          aktif.
Page 82
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/70 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

6.   INVESTASI LAIN-LAIN (lanjutan)                              6.   OTHER INVESTMENTS (continued)

     Eksposur maksimum atas risiko kredit pada tanggal                The maximum exposure to credit risk at the reporting
     pelaporan adalah sebesar nilai tercatat investasi pada           date is the carrying amount of the investments in
     efek utang dan ekuitas yang diklasifikasikan sebagai             debt and equity securities classified as financial
     aset keuangan pada nilai wajar melalui penghasilan               assets at FVOCI and FVTPL.
     komprehensif lain dan melalui laba rugi.

     Investasi lain-lain didenominasikan dalam mata uang              Other investments are denominated in US Dollars
     Dolar AS dan Rupiah.                                             and Rupiah.

     Pada tanggal 30 September 2024 dan 31 Desember                   As at 30 September 2024 and 31 December 2023,
     2023, tidak ada investasi lain-lain pada pihak berelasi.         there were no other investments with related parties.

     Lihat Catatan 43(2) untuk informasi nilai wajar dari             Refer to Note 43(2) for information on the fair value
     investasi lain-lain.                                             of other investments.


7.   PIUTANG USAHA DAN PIUTANG LAIN-LAIN                         7.   TRADE AND OTHER RECEIVABLES

     a.   Piutang usaha                                               a. Trade receivables

                                           30 September          31 Desember/
                                               2024             December 2023

          Pihak ketiga                             441,638             470,290                               Third parties
          Pihak berelasi                            52,657              66,703                             Related parties

          Sub-total                                494,295             536,993                                   Sub-total
          Dikurangi: cadangan kerugian              16,459              16,499                       Less: loss allowance

          Total, neto                              477,836             520,494                                  Total, net

          Piutang usaha Grup berdasarkan mata uang                       The Group’s trade receivables are denominated
          adalah sebagai berikut:                                        in the following currencies:

                                           30 September          31 Desember/
                                               2024             December 2023

          Dolar AS                                 282,055             333,888                                  US Dollars
          Rupiah                                   212,240             203,105                                     Rupiah

          Total                                    494,295             536,993                                       Total

          Analisis umur piutang usaha adalah sebagai                     The aging analysis of trade receivables is as
          berikut:                                                       follows:

                                           30 September          31 Desember/
                                               2024             December 2023

          Lancar                                   474,644             496,802                                  Current
          Jatuh tempo 1 - 30 hari                      467              20,625                   Overdue by 1 - 30 days
          Jatuh tempo 31 - 60 hari                     163                 406                  Overdue by 31 - 60 days
          Jatuh tempo 61 - 90 hari                     149                 397                  Overdue by 61 - 90 days
          Jatuh tempo lebih dari 90 hari            18,872              18,763             Overdue by more than 90 days

          Total                                    494,295             536,993                                       Total
Page 83
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/71 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

7.   PIUTANG      USAHA       DAN    PIUTANG     LAIN-LAIN       7.   TRADE AND OTHER RECEIVABLES (continued)
     (lanjutan)

     a.   Piutang usaha (lanjutan)                                    a. Trade receivables (continued)

          Perubahan cadangan kerugian piutang usaha                      The changes in the loss allowance on trade
          adalah sebagai berikut:                                        receivables were as follows:

                                          30 September           31 Desember/
                                              2024              December 2023

                                                                                               Balance at the beginning of
          Saldo awal periode                        16,499              10,561                                the period
          Penambahan                                   290               6,080                                   Additions
          Pembalikan cadangan
            kerugian                                   (330)              (142)                Reversal of loss allowance

          Saldo akhir periode/tahun                 16,459              16,499    Balance at the end of the period/year

          Penambahan dan pembalikan cadangan kerugian                    Additions and reversal on loss allowance on
          piutang usaha disajikan oleh Grup sebagai bagian               trade receivables are presented by the Group as
          dari “Beban usaha - umum dan administrasi - lain-              part of “Operating expenses - general and
          lain” dalam laporan laba rugi konsolidasian interim            administrative - others” in the interim
          (Catatan 31).                                                  consolidated statements of profit or loss (Note
                                                                         31).

          Lihat Catatan 34 untuk informasi rincian transaksi             Refer to Note 34 for information on the details of
          dan saldo dengan pihak berelasi.                               transactions and balances with related parties.

          Lihat Catatan 43(1) untuk informasi tentang risiko             Refer to Note 43(1) for information about the
          kredit Grup.                                                   Group’s exposure to credit risk.

          Manajemen berkeyakinan bahwa cadangan yang                     Management believes the established allowance
          dibentuk cukup untuk menutupi penurunan nilai                  is adequate to cover the impairment of trade
          dari piutang usaha.                                            receivables.

     b.   Piutang lain-lain                                           b. Other receivables

                                          30 September           31 Desember/
                                              2024              December 2023

          Pihak ketiga                             110,341              97,871                               Third parties
          Pihak berelasi                            33,777              26,096                             Related parties

          Total                                    144,118             123,967                                        Total

          Dikurangi: bagian lancar                  20,978              21,457                     Less: current portion

          Bagian tidak lancar                      123,140             102,510                       Non-current portion

          Pada tanggal 30 September 2024 dan                             As at 30 September 2024 and 31 December
          31 Desember 2023, piutang lain-lain sebagian                   2023, other receivables mainly represent
          besar merupakan piutang dari EGAT International                receivables from EGAT International Company
          Company Limited (“EGATi”), kepentingan non-                    Limited (“EGATi”), a non-controlling interest
          pengendali (Catatan 25) dan piutang bunga.                     (Note 25) and interest receivables.

          Lihat Catatan 34 untuk informasi rincian transaksi             Refer to Note 34 for information on the details of
          dan saldo dengan pihak berelasi.                               transactions and balances with related parties.

          Lihat Catatan 43(1) untuk informasi tentang risiko             Refer to Note 43(1) for information about the
          kredit Grup.                                                   Group’s exposure to credit risk.

          Manajemen Grup berpendapat bahwa cadangan                      The Group’s management is of the opinion that
          kerugian atas piutang lain-lain pada tanggal                   the loss allowance of other receivables as at
          30 September 2024 dan 31 Desember 2023 tidak                   30 September 2024 and 31 December 2023 is
          material sehingga cadangan kerugian kredit                     not material. Therefore, a provision for ECL is not
          ekspektasian tidak diperlukan.                                 considered necessary.
Page 84
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/72 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

8.   UANG MUKA DAN BIAYA DIBAYAR DIMUKA                        8.    ADVANCES AND PREPAYMENTS

                                          30 September          31 Desember/
                                              2024             December 2023

     Uang muka pembelian aset                                                         Advances for the purchase of fixed
       tetap dan proyek                           186,288             151,244                     assets and projects
     Uang muka kepada pemasok                      19,494               9,656                    Advances to suppliers
     Biaya keuangan
      yang dibayar dimuka                          18,968              19,994             Prepayment for financing costs
     Sewa dan asuransi dibayar
       dimuka                                      10,920               3,298                 Prepaid rent and insurance
     Uang muka royalti                              3,875              28,908                         Royalties advance
     Lain-lain                                     16,620               6,031                                     Others

     Total                                        256,165             219,131                                       Total

     Dikurangi: bagian lancar                      44,523              47,671                     Less: current portion

     Bagian tidak lancar                          211,642             171,460                       Non-current portion

     Manajemen berpendapat bahwa seluruh uang muka                   Management believes that all advances and
     dan biaya dibayar dimuka tersebut dapat dipulihkan.             prepayments are recoverable.


9.   PERSEDIAAN                                                9.    INVENTORIES

                                          30 September          31 Desember/
                                              2024             December 2023

     Persediaan batubara                          136,947              78,344                              Coal inventory
     Suku cadang                                   43,807              43,739                                Spare parts
     Bahan bakar dan minyak
       pelumas                                     33,284              36,029                         Fuel and lubricants
     Perlengkapan dan bahan
       pendukung                                     8,432             10,340                         Tools and supplies
     Lain-lain                                       2,459              2,624                                    Others

     Total                                        224,929             171,076                                       Total

     Pada tanggal 30 September 2024 dan 31 Desember                  As at 30 September 2024 and 31 December 2023,
     2023, persediaan Grup telah diasuransikan terhadap              the Group’s inventories were covered by insurance
     risiko kerusakan signifikan dengan nilai pertanggungan          against the risk of material damage with total
     sebesar     AS$159.012       (31   Desember       2023:         coverage of US$ 159,012 (31 December 2023:
     AS$138.633). Manajemen Grup berpendapat bahwa                   US$138,633). The Group’s management is of the
     persediaan telah diasuransikan secara memadai untuk             opinion that the inventories are adequately insured
     menutupi risiko kehilangan dan kerusakan.                       to cover the risk of loss and damage.

     Manajemen Grup berpendapat bahwa semua                          The Group’s management is of the opinion that the
     persediaan dapat digunakan atau dijual dan nilai                inventories can be either used or sold and the net
     realisasi neto persediaan masih melebihi nilai tercatat         realisable value of inventories exceeds the carrying
     persediaan, sehingga tidak diperlukan adanya provisi            amount of inventories. Therefore, a provision for
     persediaan usang dan penurunan nilai pada tanggal               obsolete stock and decline in value is not considered
     30 September 2024 dan 31 Desember 2023.                         necessary as at 30 September 2024 and
                                                                     31 December 2023.
Page 85
                                                      PT ADARO ENERGY INDONESIA Tbk
                                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                         Lampiran 5/73 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                      30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                            unless otherwise stated)

10. ASET TETAP                                                                                  10.       FIXED ASSETS
                                                                               30 September 2024
                                                                                                                          Selisih
                                                                                                                       kurs dari
                                                                                                                      penjabaran
                                                                                                                         laporan
                                                                                                                      keuangan/
                                                                                                                      Exchange
                                                                                                                      differences
                                           Saldo                                                                          due to            Saldo
                                           awal/                                                                        financial           akhir/
                                         Beginning         Penambahan/       Pengurangan/         Reklasifikasi/      statements           Ending
                                          balance            Additions         Disposals        Reclassifications1)   translation          balance


   Harga perolehan                                                                                                                                                   Acquisition costs
   Kepemilikan langsung                                                                                                                                                Direct ownership
   Tanah                                        36,097                41                  -                  (703)              227             35,662                                Land
   Bangunan                                    199,878             1,299             (9,282)                6,858               343            199,096                          Buildings
   Infrastruktur                               326,573            11,864                  -                 5,832             1,052            345,321                     Infrastructure
   Pembangkit listrik                          143,565                 -                  -                     -                 -            143,565                     Power plants
   Mesin, peralatan                                                                                                                                             Machineries, operational
     operasional dan kendaraan               2,025,581            94,800            (24,897)               16,761               526          2,112,771         equipment and vehicles
   Kapal                                       435,933            42,362             (1,688)                9,159               345            486,111                           Vessels
   Peralatan kantor                             39,223             1,319               (912)                   94                73             39,797                 Office equipment
   Fasilitas peremukan                                                                                                                                            Crushing and handling
     dan pengolahan                            530,925               438                    -                   -                     -        531,363                         facilities
   Jalan dan jembatan                          466,231                15                    -               1,513                     -        467,759               Roads and bridges

   Sub-total                                 4,204,006           152,138            (36,779)               39,514             2,566          4,361,445                          Sub-total

   Aset dalam pembangunan                      263,737           483,152             (2,580)              (25,429)              506            719,386           Construction in progress

   Aset hak-guna                                                                                                                                                     Right-of-use assets
   Tanah                                         2,320                 -                 -                       -                -              2,320                             Land
   Waduk                                         3,522            22,462                 -                       -            1,152             27,136                         Reservoir
   Bangunan                                     13,276                  -             (373)                    (98)              31             12,836                         Buildings
   Mesin, peralatan                                                                                                                                             Machineries, operational
    operasional dan kendaraan                  150,174            13,255             (1,031)              (14,788)                  35         147,645         equipment and vehicles
   Peralatan kantor                                 72                37                  -                    98                    -             207                 Office equipment

   Sub-total                                   169,364            35,754             (1,404)              (14,788)            1,218            190,144                          Sub-total

   Total                                     4,637,107           671,044            (40,763)                 (703)            4,290          5,270,975                              Total

   Akumulasi penyusutan                                                                                                                                      Accumulated depreciation
   Kepemilikan langsung                                                                                                                                                Direct ownership
   Bangunan                                    (96,485)           (7,924)            5,578                     (17)            (139)           (98,987)                         Buildings
   Infrastruktur                              (178,464)          (12,318)                -                       -             (225)          (191,007)                    Infrastructure
   Pembangkit listrik                          (60,670)           (4,297)                -                       -                -            (64,967)                    Power plants
   Mesin, peralatan                                                                                                                                             Machineries, operational
     operasional dan kendaraan              (1,565,232)         (120,507)           22,216                (11,861)             (266)         (1,675,650)       equipment and vehicles
   Kapal                                      (195,289)          (19,236)              378                      -              (129)           (214,276)                         Vessels
   Peralatan kantor                            (31,099)           (2,000)              670                     (7)              (65)            (32,501)               Office equipment
   Fasilitas peremukan                                                                                                                                            Crushing and handling
     dan pengolahan                           (393,752)           (5,694)                   -                    -                    -       (399,446)                        facilities
   Jalan dan jembatan                         (298,585)           (7,549)                   -                    -                    -       (306,134)              Roads and bridges

   Sub-total                                 (2,819,576)        (179,525)           28,842                (11,885)             (824)         (2,982,968)                        Sub-total

   Aset hak-guna                                                                                                                                                     Right-of-use assets
   Tanah                                           (529)             (97)                -                      -                     -            (626)                           Land
   Waduk                                             (1)            (255)                -                      -                   (12)           (268)                       Reservoir
   Bangunan                                      (7,494)          (1,509)              316                     25                   (21)         (8,683)                       Buildings
   Mesin, peralatan                                                                                                                                             Machineries, operational
    operasional dan kendaraan                  (48,934)          (17,116)              838                 11,885                   (38)       (53,365)        equipment and vehicles
   Peralatan kantor                                (65)              (49)                -                    (25)                    -           (139)                Office equipment

   Sub-total                                   (57,023)          (19,026)            1,154                 11,885                   (71)       (63,081)                         Sub-total

   Total                                    (2,876,599)         (198,551)           29,996                       -             (895)         (3,046,049)                            Total

   Akumulasi penurunan nilai                                                                                                                                  Accumulated impairment
   Infrastruktur                                 (5,264)                 -                  -                    -                    -          (5,264)                  Infrastructure
   Mesin, peralatan                                                                                                                                             Machineries, operational
     operasional dan kendaraan                    (839)                  -                  -                    -                    -              (839)     equipment and vehicles

   Total                                         (6,103)                 -                  -                    -                    -          (6,103)                            Total

   Nilai buku neto                           1,754,405                                                                                       2,218,823                   Net book value

   1)   Terdapat reklasifikasi dari aset tetap ke uang dimuka dan biaya dibayar dimuka                  1) There are reclassifications from fixed assets to advances and prepayments

        sebesar AS$703 pada tahun 2024.                                                                   amounting to US$703 during 2024.
Page 86
                                                      PT ADARO ENERGY INDONESIA Tbk
                                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                          Lampiran 5/74 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                        30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                                     (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                              unless otherwise stated)

10. ASET TETAP (lanjutan)                                                                         10.       FIXED ASSETS (continued)
                                                                              31 Desember/December 2023
                                                                                                                            Selisih
                                                                                                                         kurs dari
                                                                                                                        penjabaran
                                                                                                                           laporan
                                                                                                                        keuangan/
                                                                                                                        Exchange
                                                                                                                        differences
                                           Saldo                                                                            due to            Saldo
                                           awal/                                                                          financial           akhir/
                                         Beginning         Penambahan/         Pengurangan/         Reklasifikasi/      statements           Ending
                                          balance           Additions1)          Disposals        Reclassifications2)   translation          balance


   Harga perolehan                                                                                                                                                      Acquisition costs
   Kepemilikan langsung                                                                                                                                                   Direct ownership
   Tanah                                        38,204              1,120                   -                (3,505)              278             36,097                                 Land
   Bangunan                                    192,626              2,811              (4,795)                8,944               292            199,878                           Buildings
   Infrastruktur                               306,274              9,543                    -               10,472               284            326,573                      Infrastructure
   Pembangkit listrik                          143,565                  -                    -                    -                 -            143,565                      Power plants
   Mesin, peralatan                                                                                                                                                Machineries, operational
     operasional dan kendaraan               1,947,015           154,966             (177,623)              100,819               404          2,025,581          equipment and vehicles
   Kapal                                       377,473            39,336               (4,632)               23,486               270            435,933                            Vessels
   Peralatan kantor                             33,275             5,746                 (234)                  367                69             39,223                  Office equipment
   Fasilitas peremukan                                                                                                                                               Crushing and handling
     dan pengolahan                            526,473                    -                   -               4,452                     -        530,925                          facilities
   Jalan dan jembatan                          449,110                    -                   -              17,121                     -        466,231                Roads and bridges

   Sub-total                                 4,014,015           213,522             (187,284)              162,156             1,597          4,204,006                           Sub-total

   Aset dalam pembangunan                       52,903           282,176                      -             (71,334)                   (8)       263,737            Construction in progress

   Aset hak-guna                                                                                                                                                        Right-of-use assets
   Tanah                                         2,320                  -                   -                      -                    -          2,320                              Land
   Waduk                                             -              3,559                   -                      -                  (37)         3,522                          Reservoir
   Bangunan                                     10,076              3,143                  (7)                     -                   64         13,276                          Buildings
   Mesin, peralatan                                                                                                                                                Machineries, operational
    operasional dan kendaraan                  172,585            73,868               (1,524)              (94,773)                  18         150,174          equipment and vehicles
   Peralatan kantor                                 72                 -                    -                     -                    -              72                  Office equipment

   Sub-total                                   185,053            80,570               (1,531)              (94,773)                  45         169,364                           Sub-total

   Total                                     4,251,971           576,268             (188,815)                (3,951)           1,634          4,637,107                               Total

   Akumulasi penyusutan                                                                                                                                         Accumulated depreciation
   Kepemilikan langsung                                                                                                                                                   Direct ownership
   Bangunan                                    (88,800)           (12,016)              4,425                     9              (103)           (96,485)                          Buildings
   Infrastruktur                              (161,064)           (17,328)                  -                     -               (72)          (178,464)                     Infrastructure
   Pembangkit listrik                          (54,941)            (5,729)                  -                     -                 -            (60,670)                     Power plants
   Mesin, peralatan                                                                                                                                                Machineries, operational
     operasional dan kendaraan               (1,503,215)         (158,139)           168,385                (72,126)             (137)         (1,565,232)        equipment and vehicles
   Kapal                                       (174,344)          (22,125)             1,247                      -               (67)           (195,289)                          Vessels
   Peralatan kantor                             (28,786)           (2,511)               234                     12               (48)            (31,099)                Office equipment
   Fasilitas peremukan                                                                                                                                               Crushing and handling
     dan pengolahan                           (386,524)            (7,228)                    -                    -                    -       (393,752)                         facilities
   Jalan dan jembatan                         (289,841)            (8,744)                    -                    -                    -       (298,585)               Roads and bridges

   Sub-total                                 (2,687,515)         (233,820)           174,291                (72,105)             (427)         (2,819,576)                         Sub-total

   Aset hak-guna                                                                                                                                                        Right-of-use assets
   Tanah                                           (398)             (131)                    -                    -                    -            (529)                            Land
   Waduk                                              -                (1)                    -                    -                    -              (1)                        Reservoir
   Bangunan                                      (5,390)           (2,093)                    2                    -                  (13)         (7,494)                        Buildings
   Mesin, peralatan                                                                                                                                                Machineries, operational
    operasional dan kendaraan                 (100,524)           (21,881)              1,374                72,105                    (8)       (48,934)         equipment and vehicles
   Peralatan kantor                                (48)               (17)                  -                     -                     -            (65)                 Office equipment

   Sub-total                                  (106,360)           (24,123)              1,376                72,105                   (21)       (57,023)                          Sub-total

   Total                                     (2,793,875)         (257,943)           175,667                       -             (448)         (2,876,599)                             Total

   Akumulasi penurunan nilai                                                                                                                                     Accumulated impairment
   Infrastruktur                                 (5,264)                  -                   -                    -                    -          (5,264)                   Infrastructure
   Mesin, peralatan                                                                                                                                                Machineries, operational
     operasional dan kendaraan                    (839)                   -                   -                    -                    -              (839)      equipment and vehicles

   Total                                         (6,103)                  -                   -                    -                    -          (6,103)                             Total

   Nilai buku neto                           1,451,993                                                                                         1,754,405                    Net book value

   1)   Termasuk penambahan dari akuisisi INS sebesar AS$329.                                             1) Including additions from acquisition of INS amounting to US$329.
   2)   Terdapat reklasifikasi dari aset tetap ke uang dimuka dan biaya dibayar dimuka                    2) There are reclassifications from fixed assets to advances and prepayments

        sebesar AS$3.951 pada tahun 2023.                                                                   amounting to US$3,951 during 2023.
Page 87
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/75 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

10. ASET TETAP (lanjutan)                                    10.    FIXED ASSETS (continued)

    Beban penyusutan untuk periode sembilan bulan yang               Depreciation expense for the nine-month periods
    berakhir pada tanggal 30 September 2024 dan 2023                 ended 30 September 2024 and 2023 was allocated
    dialokasikan sebagai berikut:                                    as follows:

                                                   30 September
                                            2024                   2023

    Beban pokok pendapatan
      (Catatan 30)                             193,250               177,411                  Cost of revenue (Note 30)
    Beban usaha (Catatan 31)                     3,945                 6,036               Operating expenses (Note 31)
    Kapitalisasi sebagai aset tetap              1,356                     -                 Capitalised as fixed assets

    Total                                      198,551               183,447                                          Total

    Perhitungan kerugian atas pelepasan aset tetap untuk            The calculation of loss on disposal of fixed assets for
    periode sembilan bulan yang berakhir pada tanggal               the nine-month period ended 30 September 2024
    30 September 2024 dan 2023 adalah sebagai berikut:              and 2023 was as follows:

                                                   30 September
                                            2024                   2023

    Harga perolehan                              40,763                55,827                          Acquisition costs
    Akumulasi penyusutan                        (29,996)              (49,226)                  Accumulated depreciation

    Nilai buku aset tetap yang dilepas           10,767                   6,601 Carrying amount of disposed fixed assets
    Harga jual dari pelepasan                                                              Selling price from disposal of
      aset tetap                                   7,127                  2,513                            fixed assets

    Kerugian atas
     pelepasan aset tetap                                                                           Loss on disposal of
     (Catatan 32)                                  (3,640)                (4,088)               fixed assets (Note 32)

    Beberapa aset tetap tertentu AI yang dicatat dalam               Certain fixed assets of AI recorded in these interim
    laporan keuangan konsolidasian interim ini dan                   consolidated financial statements and acquired
    diperoleh selama masa PKP2B tetap menjadi properti               during the term of the CCA remain the property of
    milik Pemerintah (Barang Milik Negara atau “BMN”).               the Government (Barang Milik Negara or “BMN”).
    Berdasarkan IUPK sebagai Kelanjutan Operasi                      Based on the IUPK for the Continuation of
    Kontrak/Perjanjian, AI masih memiliki hak untuk                  Contract/Agreement Operation, AI continues to have
    menggunakan seluruh BMN yang diperoleh selama                    the right to use all BMN which had been acquired
    masa PKP2B sesuai dengan peraturan perundang-                    during the CCA period in accordance with the
    undangan yang berlaku. AI juga diharuskan untuk                  prevailing laws and regulations. AI is also required to
    memelihara dan mengamankan semua properti milik                  maintain and secure all property items of the
    Pemerintah     dan     mengembalikannya       kepada             Government and return them to the Government
    Pemerintah setelah tidak digunakan lagi untuk operasi            once they are no longer used for mining operations,
    pertambangan, serta membayar tarif tertentu atas                 and pay a certain tariff for the utilisation of BMN
    penggunaan BMN (Catatan 40o).                                    (Note 40o).

    Sesuai dengan Perjanjian Kerjasama IBT dengan                    In accordance with the Cooperation Agreement
    Pelindo beserta dengan perubahannya, sebagian aset               between IBT and Pelindo, including its amendment,
    tetap IBT, yang berada di dalam wilayah operasi                  certain fixed assets of IBT which are located in the
    pelabuhan batubara dan dicatat dalam laporan                     coal port operation and recorded in these interim
    keuangan konsolidasian interim ini akan menjadi milik            consolidated financial statements will become the
    Pelindo setelah berakhirnya 30 tahun periode operasi.            property of Pelindo at the end of the 30-year
                                                                     operating period.
Page 88
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/76 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

10.   ASET TETAP (lanjutan)                                    10.   FIXED ASSETS (continued)

      Tidak ada perbedaan signifikan antara nilai wajar dan          There is no significant difference between the fair
      nilai buku aset tetap, kecuali beberapa tanah,                 value and carrying amount of fixed assets, except for
      bangunan serta aset tetap lain. Total nilai wajar dan          certain land, buildings and other fixed assets. The
      nilai buku aset tetap tersebut masing-masing adalah            total fair values and the carrying amount of such
      sebesar AS$448.119 dan AS$396.068. Nilai wajar                 fixed assets, were US$448,119 and US$396,068,
      tersebut berdasarkan laporan penilaian independen              respectively. The fair value is based on the latest
      terakhir dari Kantor Jasa Penilai Publik (“KJPP”)              independent appraisal reports by Kantor Jasa
      Benedictus Darmapuspita dan Rekan dan KJPP                     Penilai Publik (“KJPP”) Benedictus Darmapuspita
      Tobing Panuturi dan rekan dan, penilai independen              dan Rekan and KJPP Tobing Panuturi dan Rekan,
      yang terdaftar di OJK, masing-masing No.                       registered as independent valuers with OJK, No.
      00106/2.0103-00/PP/02/0121/1/ II/2024 dan No.                  00106/2.0103-00/PP/02/0121/1/II/2024 and No.
      00107/2.0103-00/PP/02/0121/1 /II/2024 tanggal 22               00107/2.0103-00/PP/02/0121/1/II/2024 dated 22
      Februari     2024      dan     No.      00663/2.0171-          February      2024     and     No.    00663/2.0171-
      00/PI/02/0420/1/VII/2024      dan       00664/2.0171-          00/PI/02/0420/1/VII/2024      dan     00664/2.0171-
      00/PI/02/0420/1/VII/2024 tanggal 5 Juli 2024.                  00/PI/02/0420/1/VII/2024 dated 5 Juli 2024,
                                                                     respectively.

      Pada tanggal 30 September 2024, aset tetap Grup                As at 30 September 2024, the Group’s fixed assets
      telah diasuransikan terhadap semua risiko kerusakan            were insured against all risks of damage, with
      dengan total pertanggungan kurang lebih sebesar                total coverage of approximately US$5,673,153
      AS$ 5.673.153 (31 Desember 2023: AS$5.558.497),                (31 December 2023: US$5,558,497), except for
      kecuali untuk aset tetap yang tidak bisa diasuransikan         fixed assets that could not be insured such as land,
      seperti tanah, pengerukan alur Barito, dan aset dalam          the Barito channel dredging and certain construction
      pembangunan tertentu.                                          in progress.

      Manajemen Grup berpendapat bahwa aset tetap telah              The Group’s management is of the opinion that the
      diasuransikan secara memadai pada tanggal                      fixed assets were adequately insured as at
      30 September 2024 dan 31 Desember 2023.                        30 September 2024 and 31 December 2023.

      Pada tanggal 30 September 2024, harga perolehan                As at 30 September 2024, the acquisition costs of
      atas aset tetap Grup yang telah disusutkan penuh               fixed assets which have been fully depreciated but
      namun masih dipakai sebesar AS$2.037.567                       are still in use amounted to US$2,037,567
      (31 Desember 2023: AS$1.911.738).                              (31 December 2023: US$1,911,738).

      Pada tanggal 30 September 2024, aset hak-guna                  As at 30 September 2024, certain right-of-use
      tertentu dengan nilai tercatat sebesar AS$89.798               assets with a carrying amount of US$89,798
      (31 Desember 2023: AS$96.586) dijaminkan terhadap              (31 December 2023: US$96,586) were pledged for
      liabilitas sewa tertentu (Catatan 18).                         certain lease liabilities (Note 18).

      Beberapa aset tetap kepemilikan langsung tertentu              Certain directly-owned fixed assets of the Group
      telah dijaminkan sebagai jaminan untuk pinjaman                have been pledged as security for a commercial
      properti komersial (Catatan 19h) dan pinjaman                  property loan (Note 19h) and Facility Agreement
      Perjanjian Fasilitas KAI dan KPI (Catatan 19a dan              loans of KAI and KPI (Notes 19a and 19e).
      19e).
Page 89
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                  Lampiran 5/77 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                      30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                            unless otherwise stated)

10.   ASET TETAP (lanjutan)                                       10.      FIXED ASSETS (continued)

      Aset dalam pembangunan                                               Construction in progress

      Aset dalam pembangunan merupakan proyek yang                         Construction in progress represents projects that
      belum selesai pada tanggal laporan posisi keuangan                   were not completed as at the date of the interim
      konsolidasian interim dengan rincian sebagai berikut:                consolidated statements of financial position as
                                                                           follows:

                                     Persentase         Akumulasi                 Estimasi
                                    penyelesaian/         biaya/                penyelesaian/
               Aset dalam           Percentage of      Accumulated                Estimated               Construction
              pembangunan            completion           costs                  completion                in progress

      30 September 2024                                                                                     30 September 2024
      Bangunan, pabrik dan                                                   Oktober/October 2024 -          Buildings, plant and
        infrastruktur                 3% - 99%                   655,994    Desember/December 2026               infrastructure

                                                                           Desember/December 2024 -
      Jalan dan jembatan              1% - 84%                    29,567    Desember/December 2026           Roads and bridges

                                                                             Oktober/October 2024 -
      Kapal                           5% - 99%                    17,559        November 2025                            Vessels

      Fasilitas peremukan dan                                                Oktober/October 2024 -                Crushing and
        pengolahan                    1% - 99%                     8,356           April 2025                handling facilities

      Lain-lain                       5% - 99%                     7,910        Bervariasi/Various                        Others

      Total                                                      719,386                                                   Total

                                     Persentase         Akumulasi                 Estimasi
                                    penyelesaian/         biaya/                penyelesaian/
               Aset dalam           Percentage of      Accumulated                Estimated               Construction
              pembangunan            completion           costs                  completion                in progress

      31 Desember 2023                                                                                       31 December 2023
      Bangunan, pabrik dan                                                     Januari/January 2024 -        Buildings, plant and
        infrastruktur                 5% - 99%                   229,951     Desember/December 2025              infrastructure

                                                                             Desember/December 2024 -
      Jalan dan jembatan              4% - 96%                    17,588     Desember/December 2025          Roads and bridges

      Fasilitas peremukan dan                                                 Agustus/August 2024 -                Crushing and
        pengolahan                    1% - 99%                    12,609     Desember/December 2024          handling facilities

      Lain-lain                       1% - 99%                     3,589       Bervariasi/Various                         Others

      Total                                                      263,737                                                   Total

      Sesuai dengan kebijakan akuntansi Grup, manajemen                    In accordance with the Group’s accounting policies,
      melakukan pengujian penurunan nilai atas aset non-                   management tests its non-financial assets (fixed
      keuangan (aset tetap, properti pertambangan dan aset                 assets, mining properties and certain other assets)
      lain-lain tertentu) bilamana terdapat kejadian atau                  for impairment whenever events or changes in
      perubahan keadaan yang mengindikasikan bahwa nilai                   circumstances indicate that the carrying amount
      tercatat aset tersebut tidak terpulihkan (Catatan 12 dan             may not be recoverable (Notes 12 and 13). Based
      13). Berdasarkan hasil penelaahan, manajemen                         on the assessment result, management is of the
      berpendapat bahwa tidak terdapat indikasi penurunan                  opinion that there is no indication of impairment in
      nilai aset tetap, oleh karena itu, manajemen                         the value of fixed assets, therefore, management
      berkeyakinan bahwa cadangan kerugian penyisihan                      believes that the provision for impairment losses is
      penurunan nilai cukup untuk menutupi adanya                          adequate to cover any losses from the impairment of
      kerugian penurunan nilai buku aset tetap pada tanggal                the carrying amounts of fixed assets as at
      30 September 2024 dan 31 Desember 2023.                              30 September 2024 and 31 December 2023.
Page 90
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/78 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

11.   INVESTASI PADA VENTURA BERSAMA                          11.      INVESTMENTS IN JOINT VENTURES

                                         30 September         31 Desember/
                                             2024            December 2023

      Kestrel                                    756,693               726,578                                       Kestrel
      BPI                                        432,566               422,285                                          BPI
      TPI                                        123,476               129,846                                          TPI
      KHN                                         68,519                59,251                                         KHN
      BEP                                         63,091                63,041                                         BEP
      DTP                                          7,329                 6,128                                         DTP
      Lain-lain                                    1,479                   848                                       Others

                                               1,453,153              1,407,977

      Dikurangi: cadangan kerugian                                                         Less: allowance for impairment
        penurunan nilai atas investasi            44,383                44,383                   losses on investments

      Total, neto                              1,408,770              1,363,594                                   Total, net

      Pada tanggal 30 September 2024 dan 31 Desember                   As at 30 September 2024 and 31 December 2023,
      2023, ventura bersama yang dimiliki oleh Grup adalah             the joint ventures of the Group were as follows:
      sebagai berikut:

                                                         Persentase
                                                        kepemilikan/
            Nama entitas/         Kedudukan/             Percentage                        Kegiatan usaha/
            Name of entity         Domicile             of ownership                       Business activity

      Kestrel                Australia                       47.99%           Tambang batubara kokas/Coking coal mine
      BPI                    Indonesia                       34.00%           Pembangkitan tenaga listrik dan transmisi/
                                                                                 Electric power generation and
                                                                                 transmission
      TPI                    Indonesia                       65.00%           Pembangkitan tenaga listrik dan transmisi/
                                                                                 Electric power generation and
                                                                                 transmission
      DTP                    Indonesia                       49.00%           Pengolahan air/Water treatment
      BEP                    Indonesia                       18.50%           Pengangkutan batubara/Coal transportation
      KHN                    Indonesia                       50.00%           Pembangkitan listrik tenaga air/
                                                                                 Hydroelectric power generation
      GTM                    Indonesia              65.88% (2023: 54.75%)     Pengolahan air/Water treatment
      TCU                    Indonesia                    49.00%              Jasa pemeliharaan fasilitas terminal/
                                                                                 Terminal facility maintenance services
      BELL                   Indonesia                       40.00%           Investasi/Investments


      TPI                                                             TPI

      Untuk periode sembilan bulan yang berakhir pada                 For the nine-month period ended 30 September
      tanggal 30 September 2024, Grup menerima dividen                2024, the Group received dividends from TPI of
      dari TPI sebesar AS$12.025 (untuk periode sembilan              US$12,025 (for the nine-month period ended
      bulan yang berakhir pada tanggal 30 September 2023:             30 September 2023: US$18,525).
      AS$18.525).
Page 91
                                                                PT ADARO ENERGY INDONESIA Tbk
                                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                       Lampiran 5/79 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                                                    unless otherwise stated)

11.   INVESTASI PADA VENTURA BERSAMA (lanjutan)                                                                     11.       INVESTMENTS IN JOINT VENTURES (continued)

      Tabel dibawah ini menampilkan ringkasan informasi                                                                            The table below provides a summary of the financial
      keuangan ventura bersama Grup, dimana semuanya                                                                               information of the Group’s joint ventures, all of which
      tidak diperdagangkan di bursa.                                                                                               are unlisted.
                                                 Kestrel                          BPI                          TPI                DTP                 BEP               KHN           Lain-lain/Others
                                                            31                             31                         31                31                 31                 31                   31
                                             30          Desember/           30         Desember/          30      Desember/  30     Desember/   30     Desember/   30     Desember/    30      Desember/
                                         September       December        September      December        September December September December September December September December September December
                                           2024            2023            2024           2023            2024       2023    2024      2023     2024      2023     2024      2023      2024       2023

      Kas dan setara kas/
          Cash and cash equivalents           180,559      162,927         247,075        286,830         44,219      37,343          1,473     1,136     2,073     1,333    17,809    20,277     1,955     1,088
      Aset lancar/
          Current assets                      324,872      337,666         765,862        635,562         98,738      99,872          3,714     2,600     2,076     1,338    18,068    20,296     2,289     1,152
      Aset tidak lancar/
          Non-current assets                1,988,050     2,027,525       4,923,373      4,975,003       425,244     446,332         25,923    23,817    84,032    82,175    94,505    73,651    12,472     4,230
      Liabilitas keuangan jangka
          pendek (tidak termasuk
          utang usaha dan
          lain-lain)/
          Current financial
          liabilities (excluding
          trade payables and others)          110,388       82,820         231,661        203,742         41,810      43,612           475       123          -       28       228        47      4,616       539
      Liabilitas jangka pendek/
          Current liabilities                 154,804      130,241         389,782        351,815         43,690      44,976          1,390      861      2,524      121       280       191      4,667       556
      Liabilitas keuangan jangka
          panjang (tidak termasuk
          utang usaha dan
          utang lain-lain)/
          Non-current
          financial liabilities
          (excluding trade
          and other payables)                 597,589      741,653        3,606,620      3,596,585       253,919     266,986         13,290    13,050      496       485          -         -     7,278     3,073
      Liabilitas jangka panjang/
          Non-current liabilities             644,505      786,044        4,027,201      4,016,734       290,328     301,464         13,290    13,050      496       485          -         -     7,278     3,073
      Kepentingan non-pengendali/
          Non-controlling interests                 -                -            -                 -           -             -           -         -    (1,364)   (1,275)        -         -         -          -
      Pendapatan/
          Revenue                             588,079     1,008,416        576,968        817,751         59,224      85,137          3,658     4,534         -         -         -         -     1,553     4,535
      Penyusutan dan amortisasi/
          Depreciation and
          amortisation                        (93,703)     (149,691)           (587)          (710)           (63)         (154)         (3)       (4)        -         -         -         -        (2)       (1)
      Penghasilan keuangan/
          Finance income                        8,060       10,244          11,696           6,471           847           363          10        13        27        12       533      1,714        19         4
      Biaya keuangan/
          Finance costs                       (45,828)      (75,216)       (160,458)      (216,622)       (13,422)    (20,290)         (965)     (951)        -         -         1        1       (217)      (89)
      Laba/(rugi) sebelum
          pajak penghasilan/
          Profit/(loss) before
          income tax                           92,441      162,420          78,459        135,164         15,802      26,796          1,876     2,145      131        36       (812)     754        840       263
      (Beban)/manfaat
          pajak penghasilan/
          Income tax
          (expense)/benefit                   (27,734)      (45,737)        (29,634)       (23,648)        (2,754)     (5,612)            -         -         -         -         -         -       (78)      (81)
      Laba/(rugi) periode/tahun berjalan/
          Profit/(loss) for the period/year    64,707      116,683          48,825        111,516         13,048      21,184          1,876     2,145      131        36       (812)     754        762       182
      Penghasilan/(kerugian)
          komprehensif lain
          periode/tahun berjalan/
          Other comprehensive
          income/(loss) for the period/year         -                -      (18,589)       (19,679)        (4,348)     (2,380)         336       (180)     139       149      2,882     1,850        77        20
      Total penghasilan komprehensif
          periode/tahun berjalan,
          setelah pajak/
          Total comprehensive
          income/(loss) for
          the period/year, net of tax          64,707      116,683          30,236         91,837          8,700      18,804          2,212     1,965      270       185      2,070     2,604       839       202
      Persentase kepemilikan (%)/
          Percentage of
          ownership (%)                         47.99         47.99           34.00          34.00         65.00          65.00       49.00     49.00     18.50     18.50     50.00     50.00 40.00-65.88 40.00-54.75
Page 92
                                                                   PT ADARO ENERGY INDONESIA Tbk
                                                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                                         Lampiran 5/80 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                                                    unless otherwise stated)

11.   INVESTASI PADA VENTURA BERSAMA (lanjutan)                                                                       11.      INVESTMENTS IN JOINT VENTURES (continued)

      Rekonsiliasi dari ringkasan informasi keuangan yang                                                                      The reconciliation of the summarised financial
      disajikan terhadap nilai buku dari kepentingan Grup                                                                      information presented to the carrying amount of the
      dalam ventura bersama adalah sebagai berikut:                                                                            Group’s interests in the joint ventures is as follows:
                                                    Kestrel                         BPI                          TPI                DTP                 BEP               KHN           Lain-lain/Others
                                                              31                             31                         31                31                 31                 31                   31
                                                  30       Desember/           30         Desember/          30      Desember/  30     Desember/   30     Desember/   30     Desember/    30      Desember/
                                              September    December        September      December        September December September December September December September December September December
                                                2024         2023            2024           2023            2024       2023    2024      2023     2024      2023     2024      2023      2024       2023

      Pada awal periode/tahun/
          At the beginning of the
          period/year                          1,448,906    1,332,223       1,242,016      1,150,179       199,764     209,460      12,506    2,741    84,182     83,997      93,756    91,152      1,753        748
      Penambahan/Additions                             -            -               -              -             -           -         239    7,800         -          -      16,467         -        273        803
      Dividen/Dividends                                -            -               -              -       (18,500)    (28,500)          -        -         -          -           -         -        (49)         -
      Laba/(rugi) periode/tahun
          berjalan/
          Profit/(loss) for the period/year      64,707       116,683         48,825        111,516         13,048      21,184       1,876    2,145       131         36        (812)     754         762        182
      Penghasilan/(kerugian)
          komprehensif lain periode/
          tahun berjalan
          Other comprehensive
          income/(loss)
          for the period/year                          -               -      (18,589)       (19,679)        (4,348)    (2,380)       336      (180)      139        149       2,882     1,850         77          20

      Pada akhir periode/tahun/
         At the end of the
         period/year                           1,513,613    1,448,906       1,272,252      1,242,016       189,964     199,764      14,957   12,506    84,452     84,182     112,293    93,756      2,816       1,753

      Persentase kepemilikan (%)/
          Percentage of
          ownership (%)                           47.99         47.99          34.00          34.00          65.00          65.00    49.00    49.00     18.50      18.50       50.00     50.00 40.00-65.88 40.00-54.75

                                                726,383       695,330        432,566        422,285        123,476     129,846       7,329    6,128    15,624     15,574      56,146    46,878      1,479        848
      Properti pertambangan/
         Mining properties                       18,307        19,245               -                 -           -             -        -        -    47,467     47,467           -         -           -          -
      Waran/Warrants                             12,003        12,003               -                 -           -             -        -        -         -          -           -         -           -          -
      Aset tetap/
         Fixed assets                                  -               -            -                 -           -             -        -        -          -          -     12,373    12,373           -          -
      Penurunan nilai/
         Impairment                                    -               -            -                 -           -             -        -        -    (44,383)   (44,383)         -         -           -          -

      Nilai tercatat investasi pada
          ventura bersama/
          Carrying amount of
          investments in
          joint ventures                        756,693       726,578        432,566        422,285        123,476     129,846       7,329    6,128    18,708     18,658      68,519    59,251      1,479        848


      Ventura bersama Grup merupakan perusahaan swasta                                                                         The Group’s joint ventures are private companies and
      tertutup dan tidak terdapat harga pasar yang dikutip                                                                     there are no quoted market prices available for their
      yang tersedia untuk ventura bersama tersebut.                                                                            shares.

      Untuk periode sembilan bulan yang berakhir pada                                                                          For the nine-month period ended 30 September 2024
      tanggal 30 September 2024 dan 2023, bagian atas                                                                          and 2023, the share of other comprehensive -
      (kerugian)/penghasilan komprehensif lain yang diakui                                                                     (loss)/income recognised by the Group amounted to
      Grup masing-masing sebesar (AS$7.472) dan                                                                                (US$7,472) and US$31,768, respectively, while the
      AS$31.768, sedangkan bagian atas keuntungan neto                                                                         share in net profit of joint ventures recognised by the
      ventura bersama yang diakui Grup masing-masing                                                                           Group amounted to US$56,074 and US$75,298,
      sebesar AS$56.074 dan AS$75.298.                                                                                         respectively.

      Grup memiliki wakil dalam Direksi dan Komisaris pada                                                                     The Group has representation on the Boards of
      ventura bersama di atas.                                                                                                 Directors and Boards of Commissioners in the above
                                                                                                                               joint ventures.

      Manajemen Grup berpendapat bahwa tidak terdapat                                                                          The Group’s management is of the opinion that there
      kejadian-kejadian atau perubahan keadaan yang                                                                            are no events or changes of circumstances which
      mengindikasikan adanya bukti objektif penurunan nilai                                                                    indicate a permanent decline in the fair value of the
      wajar investasi, sehingga tidak diperlukan cadangan                                                                      investments. Therefore, no further provision for
      penurunan nilai atas investasi pada ventura bersama.                                                                     impairment in the value of investments in joint ventures
      Pada tanggal 30 September 2024 dan 31 Desember                                                                           is necessary. As at 30 September 2024 and
      2023, manajemen berpendapat bahwa cadangan                                                                               31 December 2023, management is of the opinion that
      kerugian penyisihan penurunan nilai cukup untuk                                                                          the provision for impairment losses was adequate to
      menutupi adanya kerugian penurunan nilai buku                                                                            cover any losses from the impairment of the carrying
      investasi pada ventura bersama.                                                                                          amounts of investments in joint ventures.
Page 93
                                               PT ADARO ENERGY INDONESIA Tbk
                                          DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                         Lampiran 5/81 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                        30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                     (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                              unless otherwise stated)

12.   PROPERTI PERTAMBANGAN                                          12.     MINING PROPERTIES
                                                         30 September 2024
                                       Tambang              Tambang
                                         yang                 dalam
                                     berproduksi/        pengembangan/
                                       Mines in            Mines under
                                      production          development            Total

      Harga perolehan                                                                                             Acquisition costs
      Saldo awal                           2,401,868             459,518            2,861,386                     Beginning balance
      Mutasi dari tambang
        dalam pengembangan                                                                                Transfer from mines under
        ke tambang yang                                                                                     development to mines
        berproduksi                           29,686             (29,686)                   -                         in production
      Penambahan                              10,376               2,339               12,715                               Additions
      Pengurangan*                                 -             (67,627)             (67,627)                            Deductions*

      Saldo akhir                          2,441,930             364,544            2,806,474                        Ending balance

      Akumulasi amortisasi                                                                               Accumulated amortisation
      Saldo awal                           (1,718,662)                 -           (1,718,662)                  Beginning balance
      Amortisasi                              (55,667)                 -              (55,667)                        Amortisation

      Saldo akhir                          (1,774,329)                 -           (1,774,329)                       Ending balance

      Penyisihan atas kerugian
        penurunan nilai                                                                            Provision for impairment losses
      Saldo awal                             (81,199)            (66,972)            (148,171)                    Beginning balance
      Pengurangan*                                 -              66,972               66,972                           Deductions*

      Saldo akhir                            (81,199)                  -              (81,199)                       Ending balance

      Total nilai tercatat                   586,402             364,544              950,946                Total carrying amount

      *) Karena kehilangan pengendalian                                                                          Due to loss of control *)

                                                    31 Desember/December 2023
                                       Tambang              Tambang
                                         yang                 dalam
                                     berproduksi/        pengembangan/
                                       Mines in            Mines under
                                      production          development         Total

      Harga perolehan                                                                                             Acquisition costs
      Saldo awal                           2,391,501             449,506            2,841,007                     Beginning balance
      Penambahan                              10,367              10,012               20,379                              Additions

      Saldo akhir                          2,401,868             459,518            2,861,386                        Ending balance

      Akumulasi amortisasi                                                                               Accumulated amortisation
      Saldo awal                           (1,659,578)                 -           (1,659,578)                  Beginning balance
      Amortisasi                              (59,084)                 -              (59,084)                        Amortisation

      Saldo akhir                          (1,718,662)                 -           (1,718,662)                       Ending balance

      Penyisihan atas kerugian
        penurunan nilai                      (81,199)            (66,972)            (148,171)        Provision for impairment losses

      Total nilai tercatat                   602,007             392,546              994,553                Total carrying amount

      Seluruh     amortisasi  properti  pertambangan                         All amortisation of mining properties was allocated to
      dialokasikan ke beban pokok pendapatan (Catatan                        cost of revenue (Note 30).
      30).

      Pada tanggal 30 September 2024 dan 31 Desember                         As at 30 September 2024 and 31 December 2023,
      2023, manajemen berpendapat bahwa tidak ada                            management is of the opinion that there are no
      indikasi penurunan nilai dan cadangan kerugian                         indicators of impairment, and the provision for
      penyisihan penurunan nilai properti pertambangan                       impairment losses is adequate to cover any potential
      cukup untuk menutupi kerugian penurunan nilai                          losses from impairment of the carrying amounts of
      properti pertambangan.                                                 mining properties.
Page 94
                                              PT ADARO ENERGY INDONESIA Tbk
                                         DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                       Lampiran 5/82 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                          30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                unless otherwise stated)

13.   GOODWILL                                                         13.   GOODWILL

                                                  30 September          31 Desember/
                                                      2024             December 2023

      Nilai tercatat                                    776,943               776,943                            Carrying amount

      Rincian goodwill berdasarkan lini usaha, sebagai                       Details of goodwill based on lines of business, are as
      berikut:                                                               follows:

                                                  Pertambangan
                                                        dan
                                                  perdagangan                Jasa
                                                  batubara/Coal         pertambangan/
                                                   mining and               Mining             Logistik/
                                                      trading              services            Logistics              Total

      30 September 2024 dan/and
        31 Desember/December 2023                        658,947                  39,665               78,331              776,943

      Sesuai dengan kebijakan akuntansi Grup, goodwill                       In accordance with the Group’s accounting policy,
      diuji penurunan nilainya secara tahunan di akhir tahun                 goodwill is tested for impairment annually at the end
      dan/atau ketika terdapat suatu indikasi bahwa nilai                    of the year and/or when the circumstances indicate
      tercatatnya mengalami penurunan nilai (Catatan 2m).                    the carrying amount may be impaired (Note 2m). For
      Untuk tujuan pengujian penurunan nilai, aset                           the purpose of assessing impairment, assets are
      dikelompokkan hingga unit terkecil yang menghasilkan                   grouped at the lowest level for which there are
      arus kas terpisah (UPK).                                               separately identifiable cash flows (CGU).

      Asumsi utama yang digunakan dalam perhitungan                          The key assumptions used for recoverable amount
      jumlah terpulihkan pada tanggal 30 Juni 2024 dan                       calculations as at 30 June 2024 and 31 December
      31 Desember 2023 adalah sebagai berikut:                               2023 were as follows:

                                                        Pertambangan dan                     Jasa
                                                      perdagangan batubara/             pertambangan/             Logistik/
                                                      Coal mining and trading           Mining services           Logistics

      Tingkat pertumbuhan setelah lima
         tahun/Growth rate after five years                       0%                          0%                      0%
      Tingkat diskonto setelah pajak (untuk
         perhitungan nilai wajar setelah
         dikurangi biaya untuk menjual)/
         Post-tax discount rate (for fair value
         less costs of disposal calculation)               9.5% - 10.0%                     10.0%                    9.0%

      Perhitungan ini menggunakan proyeksi arus kas                          These calculations use cash flow projections based
      berdasarkan anggaran keuangan yang disetujui oleh                      on financial budgets approved by the management.
      manajemen. Asumsi utama yang lain termasuk                             Other key assumptions include projected cash flows,
      proyeksi arus kas, harga batubara, estimasi cadangan                   coal price, estimated coal reserves, inflation rate,
      batubara, tingkat inflasi, tingkat penjualan dan produksi              sales and production levels and cost structures.
      dan struktur biaya.

      Manajemen menentukan asumsi utama berdasarkan                          Management determined the key assumptions
      kombinasi pengalaman masa lalu dan sumber                              based on a combination of past experience and
      eksternal.                                                             external sources.

      Pada tanggal 30 Juni 2024 dan 31 Desember 2023,                        As at 30 June 2024 and 31 December 2023, the
      jumlah terpulihkan dari setiap UPK ditentukan                          recoverable amount of the CGUs was determined
      berdasarkan perhitungan nilai wajar aset dikurangi                     based on fair value less cost of disposal calculations
      biaya pelepasan yang membutuhkan penggunaan                            which requires the use of assumptions. The
      asumsi-asumsi. Teknik penilaian menggunakan input-                     valuation technique uses significant unobservable
      input yang signifikan yang tidak dapat diobservasi,                    inputs, which represent a Level 3 fair value.
      yang merupakan nilai wajar Tingkat 3.
Page 95
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/83 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

13.   GOODWILL (lanjutan)                                       13.   GOODWILL (continued)

      Pada tanggal 30 Juni 2024, perusahaan perdagangan               As at 30 June 2024, the Group’s coal trading
      batubara Grup memiliki tingkat sensitivitas tertinggi           company had the highest sensitivity to changes in
      atas perubahan asumsi utama. UPK tersebut memiliki              key assumptions. The CGU had an excess
      kelebihan jumlah terpulihkan, dihitung berdasarkan              recoverable amount, calculated based on the fair
      nilai wajar setelah dikurangi biaya untuk menjual, dari         value less costs of disposal method, over the
      nilai tercatat, sebesar AS$445.933 (31 Desember                 carrying amount of US$445,933 (31 December
      2023: AS$269.317). Kenaikan tingkat diskonto                    2023: US$269,317). A rise in the discount rate (with
      (dengan asumsi lainnya tidak berubah) sebesar 9,69%             other assumptions remaining unchanged) of 9,69%
      (31 December 2023: 5,68%) akan menghapus                        (31 December 2023: 5.68%) would remove the
      kelebihan yang tersisa dari UPK tersebut.                       remaining headroom for the relevant CGU.

      Pada tanggal 30 September 2024 dan 31 Desember                  As at 30 September 2024 and 31 December 2023,
      2023, manajemen Grup berpendapat bahwa tidak ada                the Group’s management was of the opinion that
      kejadian atau perubahan keadaan yang dimana akan                there were no events or changes in circumstances
      mengindikasikan penurunan nilai pada saldo goodwill.            which would indicate impairment in the balance of
                                                                      goodwill.


14.   PINJAMAN UNTUK PIHAK KETIGA                               14.   LOANS TO THIRD PARTIES

                                           30 September          31 Desember/
                                               2024             December 2023

      PT Kalimantan Industrial Park
        Indonesia (“KIPI”)                                                                   PT Kalimantan Industrial Park
        (Catatan 40y)                              155,541             145,964             Indonesia (“KIPI”) (Note 40y)
      PT Persada Sentral Mineral                                                              PT Persada Sentral Mineral
        (“PSM”) (Catatan 40ac)                      34,792              24,435                      (“PSM”) (Note 40ac)
      PT Kawasan Industri Kalimantan
        Indonesia (“KIKI”)                                                               PT Kawasan Industri Kalimantan
        (Catatan 40x)                                 7,765             14,748            Indonesia (“KIKI”) (Note 40x)
      Lain-lain                                       3,843             11,942                                     Others

      Total                                        201,941             197,089                                       Total

      Dikurangi: cadangan kerugian                    3,475                   -                      Less: loss allowance

      Total                                        198,466             197,089                                       Total

      Dikurangi: bagian lancar                             -            26,356                     Less: current portion

      Bagian tidak lancar                          198,466             170,733                       Non-current portion

      Manajemen berkeyakinan bahwa cadangan yang                      Management believes the established allowance is
      dibentuk cukup untuk menutupi penurunan nilai dari              adequate to cover the impairment of loans to third
      pinjaman untuk pihak ketiga.                                    parties.

      Lihat Catatan 43(2) untuk informasi nilai wajar dari            Refer to Note 43(2) for information on the fair value
      pinjaman untuk pihak ketiga pada tanggal                        of loans to third parties as at 30 September 2024 and
      30 September 2024 dan 31 Desember 2023.                         31 December 2023.
Page 96
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/84 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

15.   UTANG USAHA                                              15.   TRADE PAYABLES

                                          30 September          31 Desember/
                                              2024             December 2023

      Pihak ketiga                                372,241             344,743                                Third parties
      Pihak berelasi                                  109                   -                              Related parties

      Total                                       372,350             344,743                                       Total

      Saldo utang usaha terutama berasal dari pembelian              Trade payables balances mainly arise from the
      bahan bakar, suku cadang, jasa perbaikan dan                   purchase of fuel, spare parts, repair and
      pemeliharaan, jasa pengangkutan batubara, dan jasa             maintenance services, coal transportation services
      pertambangan batubara.                                         and coal mining services.

      Rincian utang usaha berdasarkan mata uang adalah               Details of trade payables based on currencies are as
      sebagai berikut:                                               follows:

                                          30 September          31 Desember/
                                              2024             December 2023

      Rupiah                                      358,351             331,144                                      Rupiah
      Dolar AS                                     13,881              13,583                                  US Dollars
      Dolar Australia                                 104                   6                           Australian Dollars
      Euro                                             14                  10                                        Euro

      Total                                       372,350             344,743                                       Total

      Lihat Catatan 34 untuk informasi rincian transaksi dan          Refer to Note 34 for information on the details of
      saldo dengan pihak berelasi.                                    transactions and balances with related parties.


16. UTANG ROYALTI                                              16.   ROYALTIES PAYABLE

                                          30 September          31 Desember/
                                              2024             December 2023

      Utang royalti kepada
        Pemerintah, neto                           33,653              26,988          Government royalties payable, net

      Utang royalti kepada Pemerintah merupakan subyek               Government royalties payable are subject to audit by
      audit oleh Direktorat Pembinaan Pengusahaan Mineral            the Directorate of Mineral and Coal Business
      dan Batubara, KESDM.                                           Supervision, the MoEMR.


17.   BEBAN YANG MASIH HARUS DIBAYAR                           17.   ACCRUED EXPENSES

                                          30 September          31 Desember/
                                              2024             December 2023

      Pemasok dan kontraktor                      204,344             130,889                   Suppliers and contractors
      PNBP dan pendapatan
        pemerintah daerah                                                                 PNBP and regional government
        (Catatan 40o)                              90,729              80,307                    revenue (Note 40o)
        Bunga                                      21,655              16,577                                   Interest
      Cadangan untuk pembayaran
        penetapan Pemerintah                                                          Allowance for Government charges
        (Catatan 40m)                               8,508               8,508                            (Note 40m)
      Lain-lain                                    25,412              21,694                                    Others

      Total                                       350,648             257,975                                       Total
Page 97
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/85 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

18.   LIABILITAS SEWA                                        18.     LEASE LIABILITIES

                                         30 September         31 Desember/
                                             2024            December 2023

      PT Komatsu Astra Finance                    78,073              84,316                   PT Komatsu Astra Finance
      PT Mitsui Leasing Capital                                                                 PT Mitsui Leasing Capital
        Indonesia                                  9,305              11,475                                Indonesia
      PT Verena Multi Finance Tbk                      -                 321                 PT Verena Multi Finance Tbk
      Lain-lain                                   36,531              15,799                                      Others

      Total                                     123,909              111,911                                           Total

      Dikurangi:                                                                                                    Less:
      Bagian jangka pendek                        31,102              28,794                               Current portion

      Bagian jangka panjang                       92,807              83,117                          Non-current portion

      Grup menandatangani beberapa perjanjian sewa yang               The Group entered into several lease agreements
      berkaitan dengan sewa tanah, waduk, bangunan,                   related to the rental of land, reservoir, buildings,
      mesin, peralatan operasional, dan kendaraan dan                 machineries, operational equipment and vehicles
      peralatan kantor. Perjanjian sewa biasanya memiliki             and office equipment. Rental agreements are
      periode tetap dari satu sampai dengan dua puluh lima            typically made for fixed periods of one to twenty five
      tahun. Ketentuan sewa dinegosiasikan secara individu            years. Lease terms are negotiated on an individual
      dan mengandung syarat dan ketentuan yang berbeda.               basis and contain a wide range of different terms
                                                                      and conditions.

      Laporan laba rugi dan penghasilan komprehensif lain             The Group’s interim consolidated statements of
      konsolidasian interim Grup menyajikan saldo berikut             profit or loss and other comprehensive income
      berkaitan dengan sewa:                                          show the following amounts related to leases:

                                                    30 September
                                             2024                  2023

      Beban terkait sewa jangka
       pendek (disajikan sebagai                                                   Expenses relating to short-term leases
       bagian dari beban pokok                                                           (presented as part of cost of
       pendapatan dan beban usaha)                59,743              64,038        revenue and operating expenses)
      Beban terkait pembayaran sewa                                                   Expenses relating to variable lease
       variabel tidak termasuk dalam                                                        payments not included in
       kewajiban sewa                             55,551              49,507                           lease liabilities
      Beban bunga (disajikan sebagai                                                     Interest expense (presented as
       bagian dari biaya keuangan)                  6,205                 3,880                 part of finance costs)
      Beban terkait sewa aset
       bernilai rendah yang
       bukan merupakan sewa                                                                 Expenses relating to leases of
       jangka pendek (disajikan                                                           low-value assets that are not
       sebagai bagian dari beban                                                       short-term leases (presented as
       pokok pendapatan dan                                                                 part of cost of revenue and
       beban usaha)                                   826                 1,353                    operating expenses)

      Jumlah pengeluaran kas untuk sewa selama periode                The total cash outflow for leases for the periods
      yang berakhir pada tanggal 30 September 2024 dan                ended 30 September 2024 and 2023 were
      2023 masing-masing adalah sebesar AS$147.315 dan                US$147,315 and US$146,884, respectively.
      AS$146.884.
Page 98
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/86 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK                                               19.      BANK LOANS
                                            30 September        31 Desember/
                                                2024           December 2023

      Perjanjian Fasilitas AS$981.400 dan
        Rp1.547.900.000.000,                                                          US$981,400 and Rp1,547,900,000,000
        setelah dikurangi biaya                                                                       Facility Agreement,
        keuangan yang belum                                                                  net of unamortised financing
        diamortisasi sebesar AS$2.079                                                                   cost of US$2,079
        (31 Desember 2023: AS$1.034)               198,553                98,725         (31 December 2023: US$1,034)
      Perjanjian Fasilitas                                                                    Rp 1,800,000,000,000 Facility
        Rp 1.800.000.000.000                       118,906                      -                              Agreement
      Perjanjian Fasilitas AS$400.000,
        setelah dikurangi biaya                                                              US$400,000 Facility Agreement,
        keuangan yang belum                                                                    net of unamortised financing
        diamortisasi sebesar AS$664                                                                        cost of US$664
        (31 Desember 2023: AS$978)                  69,836                83,022             (31 December 2023: US$978)
      Perjanjian Fasilitas AS$350.000,
        setelah dikurangi biaya                                                              US$350,000 Facility Agreement,
        keuangan yang belum                                                                    net of unamortised financing
        diamortisasi sebesar AS$764                                                                        cost of US$764
        (31 Desember 2023: AS$7.237)                62,236               170,763           (31 December 2023: US$7,237)
      Perjanjian Fasilitas AS$603.600 dan
        Rp952.100.000.000,                                                              US$603,600 and Rp952,100,000,000
        setelah dikurangi biaya                                                                       Facility Agreement,
        keuangan yang belum                                                                  net of unamortised financing
        diamortisasi sebesar AS$590                                                                      cost of US$590
        (31 Desember 2023: AS$616)                  49,430                49,319           (31 December 2023: US$616)
      Perjanjian Fasilitas AS$80.000,
        setelah dikurangi keuntungan
        atas modifikasi utang sebesar
        sebesar AS$1.629                                                                     US$80,000 Facility Agreement,
        (31 Desember 2023: setelah                                                                 net of loan modification
        dikurangi biaya keuangan yang                                                                    gain of US$1,629
        belum diamortisasi                                                          (31 December 2023: net of unamortised
        sebesar AS$547)                             47,171                57,453                financing cost of US$547)
      Perjanjian Fasilitas AS$40.000                40,000                40,000             US$40,000 Facility Agreement
      Perjanjian Pinjaman Properti                                                                Commercial Property Loan
        Komersial                                    6,787                 7,203                                Agreement
      Perjanjian Fasilitas
        Rp260.000.000.000, setelah
        dikurangi biaya keuangan yang                                                 Rp260,000,000,000 Facility Agreement,
        belum diamortisasi                                                                             net of unamortised
        sebesar AS$68                                                                             financing cost of US$69
        (31 Desember 2023: AS$nihil)                 5,600                      -            (31 December 2023: US$nil)
      Perjanjian Kredit
        Rp144.770.529.123,
        setelah dikurangi biaya                                                        Rp144,770,529,123 Credit Agreement,
        keuangan yang belum                                                                   net of unamortised financing
        diamortisasi sebesar AS$65                                                                         cost of US$65
        (31 Desember 2023: AS$16)                    3,917                   902             (31 December 2023: US$16)
      Perjanjian Fasilitas AS$120.000,
        setelah dikurangi biaya                                                              US$120,000 Facility Agreement,
        keuangan yang belum                                                                    net of unamortised financing
        diamortisasi sebesar AS$nihil                                                                        cost of US$nil
        (31 Desember 2023: AS$244)                         -             119,756             (31 December 2023: US$244)

      Total                                        602,436               627,143                                      Total

      Dikurangi:                                                                                                     Less:
      Bagian jangka pendek                          96,687               222,782                            Current portion

      Bagian jangka panjang                        505,749               404,361                       Non-current portion

      Tingkat suku bunga utang bank jangka panjang                   The interest rates on the long-term bank loans were as
      tersebut adalah sebagai berikut:                               follows:

                                            30 September        31 Desember/
                                                2024           December 2023

      Dolar AS                               4.8% - 8.4%        4.2% - 8.6%                                    US Dollars
      Dolar Singapura                        5.0% - 5.1%        3.8% - 5.1%                              Singapore Dollars
      Rupiah                                 6.9% - 9.2%        8.5% - 8.8%                              Indonesia Rupiah
Page 99
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/87 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)
      a.   Perjanjian Fasilitas       AS$981.400      dan           a.    US$981,400 and Rp1,547,900,000,000 Facility
           Rp1.547.900.000.000                                            Agreement
           Pada 12 Mei 2023, KAI menandatangani                           On 12 May 2023, KAI entered into a Facility
           Perjanjian Fasilitas dengan sindikasi bank                     Agreement with a syndicate of banks for which
           yang mana Bank Mandiri bertindak sebagai                       Bank Mandiri acts as the facility agent (“KAI’s
           agen fasilitas (“Fasilitas Pinjaman KAI”).                     Loan Facility”).

           Fasilitas Pinjaman KAI terdiri dari fasilitas                  KAI’s Loan Facility consists of term loan facilities
           pinjaman berjangka dalam mata uang: (i) Dolar                  made available in: (i) US Dollars, with a total
           AS, dengan total komitmen sebesar                              commitment of US$981,400 and an annual
           AS$981.400 dan tingkat suku bunga tahunan                      interest rate of SOFR plus a certain percentage
           sebesar SOFR ditambah persentase tertentu                      (“KAI’s Tranche A Loan Facility”); and (ii) Rupiah,
           (“Fasilitas Pinjaman KAI Tranche A”); serta (ii)               with a total commitment of Rp1,547,900,000,000
           Rupiah, dengan total komitmen sebesar                          (full amount) and an annual interest rate of
           Rp1.547.900.000.000 (nilai penuh) dan tingkat                  Jakarta Interbank Offered Rate (“JIBOR”) plus a
           suku bunga tahunan sebesar Jakarta                             certain percentage (“KAI’s Tranche B Loan
           Interbank Offered Rate (“JIBOR”) ditambah                      Facility”). KAI’s Loan Facility will mature no later
           persentase tertentu ("Fasilitas Pinjaman KAI                   than 8 (eight) years from the date of the signing
           Tranche B”). Fasilitas Pinjaman KAI ini akan                   of KAI’s Loan Facility.
           jatuh tempo paling lama 8 (delapan) tahun
           sejak tanggal penandatanganan Fasilitas
           Pinjaman KAI.
           Fasilitas Pinjaman KAI akan digunakan antara                   KAI’s Loan Facility will be used for the purpose
           lain untuk tujuan pembiayaan pengembangan                      of, among others, financing the development of
           proyek smelter aluminium dan fasilitas                         an aluminium smelter project and its ancillary
           pendukungnya milik KAI yang berlokasi di                       facilities owned by KAI, located in the industrial
           kawasan industri KIPI di Kalimantan Utara,                     area of KIPI in North Kalimantan, Indonesia.
           Indonesia.

           Terkait dengan fasilitas pinjaman KAI, (i) AIA                 In relation to KAI’s Loan Facility, (i) AIA has
           telah memberikan jaminan gadai atas saham                      pledged its shares in KAI, (ii) KAI has pledged its
           miliknya di KAI, (ii) KAI telah memberikan                     bank accounts and provided fiduciary security
           jaminan berupa jaminan gadai atas rekening                     over its material fixed assets, and will provide
           bank dan telah memberikan jaminan fidusia                      fiduciary security over its receivables and
           atas aset tetap material milik KAI, serta KAI                  mortgages over land located in KAI’s project area
           akan memberikan jaminan fidusia atas piutang                   and (iii) the Company has provided corporate
           yang diterima oleh KAI dan hak tanggungan                      guarantees in proportion to AIA's ownership in
           atas tanah yang berlokasi di area proyek KAI
                                                                          KAI.
           dan (iii) Perusahaan telah memberikan
           jaminan     perusahaan       sesuai   dengan
           kepemilikan AIA di KAI.

           Selama periode sembilan bulan yang berakhir                    During    the   nine-month      period    ended
           pada tanggal 30 September 2024, KAI                            30 September 2024, KAI made drawdowns of
           melakukan penarikan sebesar AS$91.200 atas                     US$91,200 on KAI’s Tranche A Loan Facility and
           Fasilitas Pinjaman KAI Tranche A dan                           Rp143,844,000,000 (full amount) (equivalent to
           Rp143.844.000.000 (nilai penuh) (setara                        US$8,780) on KAI’s Tranche B Loan Facility (for
           dengan AS$8.780) atas Fasilitas Pinjaman KAI                   the nine-month period ended 30 September
           Tranche B (untuk periode sembilan bulan yang                   2023: drawdowns of US$90,500 on KAI’s
           berakhir pada tanggal 30 September 2023:                       Tranche A Loan Facility and Rp142,740,000,000
           penarikan sebesar AS$90.500 atas Fasilitas                     (full amount) (equivalent to US$9,508) KAI’s
           Pinjaman      KAI     Tranche      A     dan                   Tranche B Loan Facility). During the nine-month
           Rp142.740.000.000 (nilai penuh) (setara                        periods ended 30 September 2024 and 2023, KAI
           dengan AS$9.508) atas Fasilitas Pinjaman KAI                   did not make any repayments on KAI’s Tranche
           Tranche B). Selama periode sembilan bulan                      A and Tranche B Loan Facility).
           yang berakhir pada tanggal 30 September
           2024 dan 2023, KAI tidak melakukan
           pembayaran atas Fasilitas Pinjaman KAI
           Tranche A maupun Fasilitas Pinjaman KAI
           Tranche B.
Page 100
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/88 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.    BANK LOANS (continued)

      a.    Perjanjian Fasilitas AS$981.400           dan           a.    US$981,400 and Rp1,547,900,000,000 Facility
            Rp1.547.900.000.000 (lanjutan)                                Agreement (continued)

            Pada tanggal 30 September 2024, saldo                         As at 30 September 2024, the outstanding
            pinjaman yang terutang dari Fasilitas Pinjaman                balances on these KAI’s Loan Facilities were
            KAI ini adalah masing-masing sebesar                          US$181,700 and Rp286,584,000,000 (full
            AS$181.700 dan Rp286.584.000.000 (nilai                       amount)       (equivalent     to     US$18,932)
            penuh)    (setara    dengan        AS$18.932)                 (31 December       2023:     US$90,500      and
            (31 Desember     2023:     AS$90.500       dan                Rp142,740,000,000 (full amount) (equivalent to
            Rp142.740.000.000 (nilai penuh) (setara                       US$9,259)), respectively which are repayable
            dengan AS$9.259)) dan harus dibayarkan                        according to the following schedule:
            kembali dengan jadwal pembayaran sebagai
            berikut:

                               Jadwal pembayaran kembali/                            Jumlah pembayaran
                                  Repayment schedule                                      kembali/
                                       (tahun/year)                                  Repayment amount

                                            2026                                                        7,864
                                            2027                                                       30,629
                                            2028                                                       38,562
                                            2029                                                       41,548
                                            2030                                                       44,809
                                            2031                                                       37,220

                                           Total                                                      200,632

           Sesuai dengan ketentuan dalam Fasilitas                        In accordance with KAI’s Loan Facility, KAI is
           Pinjaman KAI, KAI diwajibkan untuk memenuhi                    required to fulfil financial covenants including to
           kewajiban keuangan termasuk mematuhi syarat                    comply with the terms and conditions stated in
           dan ketentuan yang tercantum dalam Fasilitas                   KAI’s Loan Facility. As at 30 September 2024 and
           Pinjaman KAI. Pada tanggal 30 September                        31 December 2023, KAI had complied with the
           2024 dan 31 Desember 2023, KAI telah                           financial ratios and related terms and conditions.
           memenuhi rasio keuangan dan persyaratan dan
           ketentuan tersebut.

      b.   Perjanjian Fasilitas Rp1.800.000.000.000                b.     Rp1,800,000,000,000 Facility Agreement

           Pada tanggal 22 Juli 2024, SIS mengadakan                      On 22 July 2024, SIS entered into a Syndicated
           Perjanjian     Pinjaman    Sindikasi   sebesar                 Loan Agreement of Rp1,800,000,000,000 (full
           Rp1.800.000.000.000 (nilai penuh) (“Perjanjian                 amount) (“Syndicated Loan Agreement”) with a
           Pinjaman Sindikasi”) dengan sindikasi bank                     syndicate of banks, for which Bank Mandiri acts
           yang di mana Bank Mandiri bertindak sebagai                    as the facility agent. The Company acts as the
           agen fasilitas. Perusahaan bertindak sebagai                   guarantor of this loan facility. This loan facility is
           penjamin atas fasilitas pinjaman ini. Fasilitas                an amortising term loan facility and will be due in
           pinjaman ini merupakan fasilitas pinjaman                      3 years from the date of the Syndicated Loan
           amortisasi berjangka dan akan jatuh tempo                      Agreement. The amortising term loan facility is
           3 tahun sejak tanggal Perjanjian Pinjaman                      repayable on a quarterly basis with the first
           Sindikasi. Fasilitas pinjaman amortisasi                       installment due in October 2024. This facility
           berjangka ini dibayarkan setiap kuartal dengan                 bears a fixed interest rate and is not bound by any
           angsuran pertama pada bulan Oktober 2024.                      collateral.
           Fasilitas ini dikenakan suku bunga tetap dan
           tidak diikat dengan jaminan apapun.

           Fasilitas pinjaman ini akan digunakan untuk                    This loan facility will be used to repay all the
           membayar kembali semua jumlah terutang atas                    amount due under the term loan facility that must
           fasilitas pinjaman berjangka yang harus                        be repaid under the US$350,000 Facility
           dibayarkan berdasarkan Perjanjian Fasilitas                    Agreement (Note 19d), finance SIS’ other
           AS$350.000 (Catatan 19d), membiayai                            general corporate purposes, and pay transaction
           keperluan SIS secara umum lainnya, dan                         costs and expenses related to Syndicated Loan
           membayar biaya transaksi dan pengeluaran                       Agreement.
           terkait Perjanjian Pinjaman Sindikasi.
Page 101
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/89 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      b.    Perjanjian   Fasilitas   Rp1.800.000.000.000           b.    Rp1,800,000,000,000 Facility Agreement
           (lanjutan)                                                   (continued)

           Pada tanggal 26 Juli 2024, SIS telah melakukan               On 26 July 2024, SIS has made full drawdown
           penarikan penuh pada fasilitas pinjaman                      on the amortising term loan facility.
           amortisasi berjangka tersebut.

           Selama periode sembilan bulan yang berakhir                  During the nine-month period ended
           pada tanggal 30 September 2024, SIS belum                    30 September 2024, SIS has not made
           melakukan pembayaran cicilan. Pada tanggal                   instalment payments yet. As at 30 September
           30 September 2024, saldo pinjaman yang                       2024, the outstanding balance of this loan
           terutang dari fasilitas pinjaman ini adalah                  facility was US$118,906 (31 December 2023:
           sebesar AS$118.906 (31 Desember 2023:                        US$nil) which is repayable according to the
           AS$nihil) dan harus dibayarkan dengan jadwal                 following schedule:
           pembayaran sebagai berikut:

                               Jadwal pembayaran kembali/                        Jumlah pembayaran
                                  Repayment schedule                                  kembali/
                                       (tahun/year)                              Repayment amount

                                            2024                                                    5,113
                                            2025                                                   20,452
                                            2026                                                   42,806
                                            2027                                                   50,535

                                           Total                                                 118,906

           Sesuai dengan ketentuan dalam Perjanjian                     In accordance with the Syndicated Loan
           Pinjaman Sindikasi, SIS diharuskan untuk                     Agreement, SIS is required to maintain certain
           menjaga beberapa rasio keuangan tertentu. SIS                financial ratios. SIS is also required to comply
           juga diharuskan untuk memenuhi beberapa                      with certain terms and conditions with regard
           persyaratan dan ketentuan mengenai Anggaran                  to its Articles of Association, the nature of the
           Dasar, kegiatan usaha, aksi korporasi, kegiatan              business,      corporate    actions,    financing
           pembiayaan dan lainnya.                                      activities and other matters.

      c.   Perjanjian Fasilitas AS$400.000                         c.   US$400,000 Facility Agreement

           Pada tanggal 23 April 2021, AI mengadakan                    On 23 April 2021, AI entered into a Facility
           Perjanjian Pemberian Fasilitas Pinjaman                      Agreement of US$400,000 with a syndicate of
           sebesar AS$400.000 dengan sindikasi bank,                    banks, for which Bank Mandiri acts as the
           yang mana Bank Mandiri bertindak sebagai                     facility agent. The Company acts as the
           agen fasilitas. Perusahaan bertindak sebagai                 guarantor of this loan facility. This loan facility
           penjamin atas fasilitas pinjaman ini. Fasilitas              was used to refinance all amounts due under
           pinjaman ini digunakan untuk membiayai                       previous loan facility agreements.
           kembali semua jumlah yang terutang
           berdasarkan perjanjian fasilitas sebelumnya.

           Pada tanggal 21 Februari 2023, AI mengubah                   On 21 February 2023, AI amended the
           Perjanjian    Fasilitas AS$400.000    untuk                  US$400,000 Facility Agreement to change the
           mengubah suku bunga dari LIBOR menjadi                       interest rate from LIBOR to SOFR, which was
           SOFR yang berlaku efektif pada tanggal                       effective from 27 April 2023.
           27 April 2023.

           Fasilitas pinjaman ini akan jatuh tempo pada                 This facility has a final maturity date of 23 April
           tanggal 23 April 2026 dan dibayarkan cicilan                 2026 and is payable in installments on a
           setiap kuartal, dikenakan bunga sebesar SOFR                 quarterly basis, bears interest at SOFR plus a
           ditambah persentase tertentu, dan tidak diikat               certain percentage, and is not bound by any
           dengan jaminan apapun.                                       collateral.
Page 102
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/90 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)

      c.   Perjanjian Fasilitas AS$400.000 (lanjutan)               c.    AS$400,000 Facility Agreement (continued)

           Selama periode sembilan bulan yang berakhir                    During the nine-month period ended
           pada tanggal 30 September 2024 dan 2023, AI                    30 September 2024 and 2023, AI has made
           telah melakukan pembayaran cicilan masing-                     instalment payments respectively amounting
           masing sebesar AS$13.500 dan AS$45.000.                        to US$13,500 and US$45,000 respectively. As
           Pada tanggal 30 September 2024, saldo                          at 30 September 2024, the outstanding
           pinjaman yang terutang dari fasilitas pinjaman                 balance of this loan facility was US$70,500
           ini adalah sebesar AS$70.500 (31 Desember                      (31 December 2023: US$84,000) which is
           2023: AS$84.000) dan harus dibayarkan                          repayable according to the following schedule:
           dengan jadwal pembayaran sebagai berikut:

                               Jadwal pembayaran kembali/                          Jumlah pembayaran
                                  Repayment schedule                                    kembali/
                                       (tahun/year)                                Repayment amount

                                            2024                                                       4,500
                                            2025                                                      27,750
                                            2026                                                      38,250

                                            Total                                                     70,500

           Sesuai dengan ketentuan dalam perjanjian                       In accordance with the loan agreement, AI is
           pinjaman, AI diharuskan untuk menjaga                          required to maintain certain financial ratios. AI
           beberapa rasio keuangan tertentu. AI juga                      is also required to comply with certain terms
           diharuskan    untuk    memenuhi      beberapa                  and conditions with regard to its Articles of
           persyaratan dan ketentuan mengenai Anggaran                    Association, the nature of the business,
           Dasar, kegiatan usaha, aksi korporasi, kegiatan                corporate actions, financing activities and other
           pembiayaan dan lainnya. Pada tanggal                           matters. As at 30 September 2024 and
           30 September 2024 dan 31 Desember 2023, AI                     31 December 2023, AI is in compliance with
           telah memenuhi rasio keuangan dan                              the financial ratios and related terms and
           persyaratan dan ketentuan tersebut.                            conditions.

      d.   Perjanjian Fasilitas AS$350.000                           d.   US$350,000 Facilities Agreement

           Pada tanggal 29 Juli 2022, SIS mengadakan                      On 29 July 2022, SIS entered into a Facilities
           Perjanjian Fasilitas sebesar AS$350.000                        Agreement         of   US$350,000        (“Facilities
           (“Perjanjian Fasilitas”) dengan sindikasi bank                 Agreement”) with a syndicate of banks, for
           yang mana Bank Mandiri bertindak sebagai                       which Bank Mandiri acts as the facility agent.
           agen fasilitas. Perusahaan bertindak sebagai                   The Company acts as the guarantor of this
           penjamin atas fasilitas pinjaman ini. Fasilitas                loan facility. This loan facility consists of a term
           pinjaman ini terdiri dari fasilitas pinjaman                   loan facility of US$150,000 and a
           berjangka sebesar AS$150.000 dan fasilitas                     revolving loan facility of US$200,000 and both
           pinjaman revolving sebesar AS$200.000 dan                      facilities will be due in 60 months from the date
           kedua fasilitas tersebut memiliki jatuh tempo                  of the Facilities Agreement. The term loan
           60 bulan sejak tanggal Perjanjian Fasilitas.                   facility is repayable in installments on a
           Fasilitas pinjaman berjangka ini dibayarkan                    quarterly basis with the first instalment due in
           cicilan setiap kuartal dengan angsuran pertama                 January 2023. This facility bears interest at
           pada bulan Januari 2023. Fasilitas ini dikenakan               SOFR plus a certain percentage. This facility is
           suku bunga sebesar SOFR ditambah                               not bound by any collateral.
           persentase tertentu. Fasilitas ini tidak diikat
           dengan jaminan apapun.

           Fasilitas pinjaman ini digunakan untuk                         This loan facility was used for loan refinancing
           membiayai kembali semua pinjaman yang                          to repay all outstanding loans due under the
           terutang berdasarkan perjanjian fasilitas                      previous facility agreement, transaction costs
           sebelumnya, membayar biaya transaksi dan                       and other expenses related to these facilities,
           biaya lain yang berhubungan dengan fasilitas                   other capital expenditures and general
           ini.                                                           corporate purposes.
Page 103
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/91 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.    BANK LOANS (continued)

      d.   Perjanjian Fasilitas AS$350.000 (lanjutan)               d.       US$350,000 Facility Agreement (continued)

           Selama periode sembilan bulan yang berakhir                       During the nine-month period ended
           pada tanggal 30 September 2024 dan                                30 September 2024 and 30 September 2023,
           30 September 2023, SIS telah melakukan                            SIS has made fully repayment and instalment
           pelunasan serta pembayaran cicilan masing-                        payments of US$120,000 and US$22,500
           masing sebesar AS$120.000 dan AS$22.500                           respectively, on the term loan facilities. As at
           atas fasilitas pinjaman berjangka. Pada tanggal                   30 September 2024, the outstanding balance
           30 September 2024, saldo pinjaman yang                            of this loan facility was US$nil (31 December
           terutang dari fasilitas pinjaman ini adalah                       2023: US$120,000).
           sebesar AS$nihil (31 Desember 2023:
           AS$120.000).

           Selama periode sembilan bulan yang berakhir                       During the nine-month period ended
           pada tanggal 30 September 2024, SIS                               30 September 2024, SIS made drawdowns of
           melakukan penarikan sebesar AS$83.000 dan                         US$83,000 and repayments of US$78,000 on
           pembayaran sebesar AS$78.000 atas fasilitas                       the revolving loan facility (for the nine-month
           pinjaman revolving (untuk periode sembilan                        period ended 30 September 2023: drawdowns
           bulan yang berakhir pada tanggal 30 September                     of US$55,000 and repayments of US$25,000).
           2023: penarikan sebesar AS$55.000 dan                             As at 30 September 2024, the outstanding
           pembayaran sebesar AS$25.000). Pada                               balance of this loan facility was US$63,000
           tanggal 30 September 2024, saldo pinjaman                         (31 December 2023: US$58,000).
           yang terutang dari fasilitas pinjaman ini adalah
           sebesar AS$63.000 (31 Desember 2023:
           AS$58.000).

           Sesuai dengan ketentuan dalam Perjanjian                          In accordance with the Facilities Agreement,
           Fasilitas, SIS diharuskan untuk menjaga                           SIS is required to maintain certain financial
           beberapa rasio keuangan tertentu. SIS juga                        ratios. SIS is also required to comply with
           diharuskan    untuk    memenuhi      beberapa                     certain terms and conditions with regard to its
           persyaratan dan ketentuan mengenai Anggaran                       Articles of Association, the nature of the
           Dasar, kegiatan usaha, aksi korporasi, kegiatan                   business,    corporate    actions,   financing
           pembiayaan dan lainnya. Pada tanggal                              activities and other matters. As at
           30 September 2024 dan 31 Desember 2023,                           30 September 2024 and 31 December 2023,
           SIS telah memenuhi rasio keuangan dan                             SIS is in compliance with the financial ratios
           persyaratan dan ketentuan tersebut.                               and related terms and conditions

           Marjin untuk fasilitas pinjaman revolving telah                   The margin for the revolving loan facility has
           mengalami penurunan berlaku efektif sejak                         been reduced effective since 16 August 2024.
           tanggal 16 Agustus 2024.

      e.   Perjanjian  Fasilitas     AS$603.600       dan           e.      US$603,600 and Rp952,100,000,000 Facility
           Rp952.100.000.000                                                Agreement

           Pada 12 Mei 2023, KPI menandatangani                              On 12 May 2023, KPI entered into a Facility
           Perjanjian Fasilitas dengan sindikasi bank yang                   Agreement with a syndicate of banks for which
           mana Bank Mandiri bertindak sebagai agen                          Bank Mandiri acts as the facility agent (“KPI’s
           fasilitas (“Fasilitas Pinjaman KPI”).                             Loan Facility”).

           Fasilitas Pinjaman KPI terdiri dari fasilitas                     KPI’s Loan Facility consists of term loan
           pinjaman berjangka dalam mata uang: (i) Dolar                     facilities made available in: (i) US Dollars, with
           AS,      dengan    total komitmen     sebesar                     a total commitment of US$603,600 and an
           AS$603.600 dan tingkat suku bunga tahunan                         annual interest rate of SOFR plus a certain
           sebesar SOFR ditambah persentase tertentu                         percentage ("KPI’s Tranche A Loan Facility”);
           ("Fasilitas Pinjaman KPI Tranche A”); serta (ii)                  and (ii) Rupiah, with a total commitment of
           Rupiah, dengan total komitmen sebesar                             Rp952,100,000.000 (full amount) and an
           Rp952.100.000.000 (nilai penuh) dan tingkat                       annual interest rate of JIBOR plus a certain
           suku bunga tahunan sebesar JIBOR ditambah                         percentage (“KPI’s Tranche B Loan Facility”).
           persentase tertentu (“Fasilitas Pinjaman KPI                      KPI’s Loan facility will mature no later than 10
           Tranche B”). Fasilitas Pinjaman KPI ini akan                      (ten) years from the signing date of KPI’s Loan
           jatuh tempo paling lama 10 (sepuluh) tahun                        Facility.
           sejak tanggal penandatanganan Fasilitas
           Pinjaman KPI.
Page 104
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/92 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)
      e.   Perjanjian Fasilitas AS$603.600           dan           e.       US$603,600 and Rp952,100,000,000 Facility
           Rp952.100.000.000 (lanjutan)                                     Agreement (continued)

           Fasilitas Pinjaman KPI akan digunakan untuk                      KPI’s Loan Facility will be used for financing
           pembiayaan        pengembangan         proyek                    the development of a power plant project
           pembangkit listrik yang berlokasi di kawasan                     located in an industrial area developed by
           industri yang dikembangkan oleh KIPI, di                         KIPI, in North Kalimantan, Indonesia.
           Kalimantan Utara, Indonesia.

           Terkait dengan Fasilitas Pinjaman KPI, AAI                       In relation to KPI’s Loan Facility, AAI has
           telah memberikan jaminan gadai atas saham                        pledged its shares pro-rate as per its
           secara prorata sesuai kepemilikannya dan                         ownership and the Company as sponsor has
           Perusahaan sebagai sponsor juga telah                            also     provided      corporate      guarantee
           memberikan jaminan perusahaan secara                             proportionately. Along with that, KPI has also
           proporsional. Selain itu, KPI juga telah                         pledged its bank accounts and provided
           memberikan jaminan berupa jaminan gadai                          fiduciary security on its material fixed assets
           atas rekening bank dan jaminan fidusia atas                      and will provide fiduciary security on its
           aset tetap material milik KPI, serta akan                        receivables and mortgage over land located in
           memberikan jaminan fidusia atas piutang yang                     KPI’s project area.
           diterima oleh KPI dan hak tanggungan atas
           tanah yang berlokasi di area proyek KPI.

           Selama periode sembilan bulan yang berakhir                      During the nine-month periods ended
           pada tanggal 30 September 2024, KPI tidak                        30 September 2024, KPI did not make any
           melakukan penarikan atau pembayaran atas                         drawdowns or repayments on KPI’s Tranche A
           Fasilitas Pinjaman KPI Tranche A maupun                          and Tranche B Loan Facility (for the nine-
           Tranche B (untuk periode sembilan bulan yang                     month periods ended 30 September 2023: KPI
           berakhir pada tanggal 30 September 2023:                         made drawdowns of US$45,300 on KPI’s
           penarikan sebesar AS$45.300 atas Fasilitas                       Tranche       A      Loan      Facility    and
           Pinjaman       KPI      Tranche     A       dan                  Rp71,455,000,000 (full amount) (equivalent to
           Rp71.455.000.000 (nilai penuh) (setara                           US$4,760) on KPI’s Tranche B Loan Facility
           dengan AS$4.760) atas Fasilitas Pinjaman                         and did not make any repayments on KPI’s
           KPI Tranche B dan tidak melakukan                                Tranche A and Tranche B Loan Facility). As at
           pembayaran atas Fasilitas Pinjaman KPI                           30 September 2024, the outstanding balances
           Tranche A dan Tranche B). Pada tanggal                           on these KPI’s Loan Facilities were
           30 September 2024, saldo pinjaman yang                           US$45,300 and Rp71,455,000,000 (full
           terutang dari Fasilitas Pinjaman KPI ini adalah                  amount)      (equivalent     to      US$4,720)
           masing-masing sebesar AS$45.300 dan                              (31 December       2023:    US$45,300      and
           Rp71.455.000.000 (nilai penuh) (setara                           Rp71,455,000,000 (full amount) (equivalent to
           dengan AS$4.720) (31 Desember 2023:                              US$4,635)), respectively which are repayable
           AS$45.300 dan Rp71.455.000.000 (nilai                            according to the following schedule:
           penuh) (setara dengan AS$4.635)) dan harus
           dibayarkan      kembali      dengan      jadwal
           pembayaran sebagai berikut:

                               Jadwal pembayaran kembali/                           Jumlah pembayaran
                                  Repayment schedule                                     kembali/
                                      (tahun/year)                                  Repayment amount

                                           2026                                                       2,781
                                           2027                                                       5,878
                                           2028                                                       6,247
                                           2029                                                       6,651
                                           2030                                                       7,067
                                           2031                                                       7,475
                                           2032                                                       7,819
                                           2033                                                       6,102

                                           Total                                                    50,020
Page 105
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/93 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      e.   Perjanjian Fasilitas AS$603.600           dan           e.       US$603,600 and Rp952,100,000,000 Facility
           Rp952.100.000.000 (lanjutan)                                     Agreement (continued)

           Sesuai dengan ketentuan dalam Fasilitas                          In accordance with KPI’s Loan Facility, KPI is
           Pinjaman KPI, KPI diwajibkan untuk memenuhi                      required to fulfil financial covenants including
           kewajiban keuangan termasuk mematuhi                             to comply with the terms and conditions stated
           syarat dan ketentuan yang tercantum dalam                        in KPI’s Loan Facility. As at 30 September
           Fasilitas Pinjaman KPI. Pada tanggal                             2024 and 31 December 2023, KPI had
           30 September 2024 dan 31 Desember 2023,                          complied with the financial ratios and related
           KPI telah memenuhi rasio keuangan dan                            terms and conditions.
           persyaratan dan ketentuan tersebut.

      f.   Perjanjian Fasilitas AS$80.000                          f.       US$80,000 Facility Agreement

           Pada tanggal 6 Mei 2021, MSW mengadakan                          On 6 May 2021, MSW entered into a Credit
           Perjanjian Fasilitas Kredit sebesar AS$80.000                    Facility Agreement of US$80,000 with a
           dengan sindikasi bank yang mana Bank                             syndicate of banks for which Bank Mandiri acts
           Mandiri bertindak sebagai agen fasilitas.                        as the facility agent. The Company acts as the
           Perusahaan bertindak sebagai penjamin atas                       guarantor of this term loan facility.
           fasilitas pinjaman berjangka ini.

           Fasilitas pinjaman ini digunakan untuk                           This loan facility was used for repayment of the
           membayar kembali jumlah pinjaman yang                            loan obtained from the Company, for paying
           diperoleh dari Perusahaan, membayar biaya                        transaction costs and expenses associated
           transaksi dan biaya lain yang berhubungan                        with the facility, payments of one-time
           dengan perjanjian fasilitas ini, pembayaran                      permitted       dividends      distribution    to
           atas distribusi dividen yang diperbolehkan satu                  shareholders and to ensure the availability of
           kali terhadap pemegang saham serta                               an adequate DSRA balance in PT Bank
           memastikan tersedianya saldo DSRA yang                           Permata Tbk (Note 5).
           memadai di PT Bank Permata Tbk (Catatan 5).

           Pada tanggal 20 Juni 2023, MSW                                   On 20 June 2023, MSW signed an amended
           menandatangani perjanjian yang diubah dan                        and restated agreement to the US$80,000
           dinyatakan kembali terkait Perjanjian Fasilitas                  Facility Agreement to change the interest rate
           AS$80.000 untuk mengubah suku bunga dari                         from LIBOR to SOFR and changes to the
           LIBOR menjadi SOFR dan perubahan                                 covenants.
           kovenan.

           Fasilitas ini akan jatuh tempo pada tanggal                      This facility has a final maturity date of 6 May
           6 Mei 2028. Fasilitas ini tidak diikat dengan                    2028. This facility is not bound by any
           jaminan apapun.                                                  collateral.

           Pada tanggal 22 Desember 2023, MSW                               On 22 December 2023, MSW signed
           menandatangani Adendum I atas Perjanjian                         Addendum I to the Amended and Restated
           Perubahan dan Pernyataan Kembali tanggal                         agreement dated 20 June 2023 to the
           20 Juni 2023 terkait Perjanjian Fasilitas                        US$80,000 Facility Agreement to reduce the
           AS$80.000 untuk melakukan penurunan                              fixed margin of the interest.
           marjin tetap atas suku bunga.
Page 106
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/94 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      f.   Perjanjian Fasilitas AS$80.000 (lanjutan)               f.       US$80,000 Facility Agreement (continued)

           Selama periode sembilan bulan yang berakhir                      During the nine-month period ended
           pada tanggal 30 September 2024 dan 2023,                         30 September 2024 and 2023, MSW made
           MSW telah melakukan pembayaran cicilan                           instalment payments amounting to US$9,200
           masing-masing sebesar AS$9.200 dan                               and    US$8,800       respectively.  As at
           AS$8.800. Pada tanggal 30 September 2024,                        30 September 2024, the outstanding balance
           saldo pinjaman yang terutang dari fasilitas                      of this loan facility was US$48,800 (31
           pinjaman ini adalah sebesar AS$48.800                            December 2023: US$58,000) and is repayable
           (31 Desember 2023: AS$58.000) dan harus                          according to the following schedule:
           dibayarkan    kembali    dengan     jadwal
           pembayaran sebagai berikut:

                              Jadwal pembayaran kembali/                            Jumlah pembayaran
                                 Repayment schedule                                      kembali/
                                      (tahun/year)                                  Repayment amount

                                            2024                                                       3,200
                                            2025                                                      12,800
                                            2026                                                      13,200
                                            2027                                                      11,400
                                            2028                                                       8,200

                                           Total                                                      48,800

           Sesuai dengan ketentuan dalam perjanjian                         In accordance with the loan agreement, MSW
           pinjaman, MSW diharuskan untuk menjaga                           is required to maintain certain financial ratios.
           beberapa rasio keuangan tertentu. MSW juga                       MSW is also required to comply with certain
           diharuskan untuk memenuhi beberapa                               terms and conditions with regard to certain
           persyaratan dan ketentuan mengenai hal-hal                       matters regulated in its Articles of Association,
           tertentu yang diatur dalam Anggaran Dasar,                       as well as in implementing its line of business,
           serta dalam melaksanakan kegiatan usaha,                         corporate actions, financing activities and other
           aksi korporasi, kegiatan pembiayaan dan                          matters. As at 30 September 2024 and
           lainnya. Pada tanggal 30 September 2024 dan                      31 December 2023, MSW is in compliance with
           31 Desember 2023, MSW telah memenuhi                             the financial ratios and related terms and
           rasio keuangan dan persyaratan dan                               conditions.
           ketentuan tersebut.

      g.   Perjanjian Fasilitas AS$40.000                          g.       US$40,000 Facility Agreement

           Pada tanggal 5 Desember 2017, AIS                                On 5 December 2017, AIS entered into an
           menandatangani Perjanjian Uncommitted                            Uncommitted Multi-Currency Revolving Term
           Multi-Currency Revolving Term Loan Facility                      Loan Facility Agreement of US$50,000 with
           sebesar AS$50.000 dengan DBS Bank Ltd.                           DBS Bank Ltd. As at 28 February 2022, the
           Pada tanggal 28 Februari 2022, fasilitas                         loan facility has been reduced to US$40,000.
           pinjaman ini telah diturunkan menjadi                            The Company acts as the guarantor for this
           AS$40.000. Perusahaan bertindak sebagai                          loan facility. This loan facility was used for
           penjamin atas fasilitas pinjaman ini. Fasilitas                  working capital.
           pinjaman ini digunakan untuk membiayai
           kebutuhan modal kerja.
Page 107
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/95 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

19.   UTANG BANK (lanjutan)                                 19.   BANK LOANS (continued)

      g.   Perjanjian Fasilitas AS$40.000 (lanjutan)              g.       US$40,000 Facility Agreement (continued)

           Pada      tanggal  30   Juni     2023,   AIS                    On 30 June 2023, AIS signed an amendment
           menandatangani surat perubahan untuk                            letter to change the interest rate applicable for
           mengubah suku bunga yang berlaku atas                           this loan facility from LIBOR to SOFR. This
           fasilitas pinjaman ini dari LIBOR menjadi                       loan facility bears interest at SOFR plus a
           SOFR. Fasilitas pinjaman ini dikenakan bunga                    certain percentage.
           sebesar SOFR ditambah persentase tertentu.

           Pada tanggal 30 September 2024 dan                              As at 30 September 2024 and 31 December
           31 Desember 2023, saldo pinjaman yang                           2023, the outstanding balance of this loan
           terutang dari fasilitas pinjaman ini adalah                     facility was US$40,000. This loan facility
           sebesar AS$40.000. Fasilitas pinjaman ini                       should be repaid on the last day of the interest
           akan dibayar kembali pada akhir periode                         period or on any other date as agreed by DBS
           bunga atau pada tanggal lain yang                               Bank Ltd.
           sebagaimana disepakati oleh DBS Bank Ltd.

           AIS harus memenuhi beberapa persyaratan                         AIS is required to comply with certain terms
           dan ketentuan yang ditetapkan dalam                             and conditions set out in this agreement. As at
           perjanjian ini. Pada tanggal 30 September                       30 September 2024 and 31 December 2023,
           2024 dan 31 Desember 2023, AIS telah                            AIS had complied with the related terms and
           memenuhi persyaratan dan ketentuan                              conditions.
           tersebut.

      h.   Perjanjian Pinjaman Properti Komersial                 h.       Commercial Property Loan Agreement

           AIS memperoleh pinjaman properti komersial                      AIS obtained a commercial property loan of
           sebesar S$10.751.900 (nilai penuh) dari UOB                     S$10,751,900 (full amount) from UOB Bank
           Bank Limited Singapore sebagaimana                              Limited Singapore as set out in the letter of
           tercantum dalam surat penawaran tertanggal                      offer dated 10 October 2022. This loan facility
           10 Oktober 2022. Fasilitas pinjaman ini                         was used for the purchase of a commercial
           digunakan     untuk     pembelian     properti                  property. The property is pledged for this
           komersial. Properti tersebut dijaminkan untuk                   facility (Note 10). The loan bears interest at the
           fasilitas ini (Catatan 10). Pinjaman ini                        Singapore Overnight Rate Average (“SORA”)
           dikenakan     bunga     sebesar     Singapore                   plus a certain percentage and has a final
           Overnight Rate Average (“SORA”) ditambah                        maturity date of ten years from the first
           persentase tertentu dan memiliki jangka waktu                   drawdown date.
           sepuluh tahun sejak tanggal penarikan
           pertama.

           AIS telah melakukan penarikan sebesar                           AIS has made a drawdown of S$10,751,900
           S$10.751.900 (nilai penuh) dari pinjaman                        (full amount) from the loan. During the nine-
           tersebut. Selama periode sembilan bulan yang                    month period ended 30 September 2024 and
           berakhir pada tanggal 30 September 2024 dan                     2023, AIS has made instalment payments
           2023, AIS telah melakukan pembayaran                            amounting to S$806,400 (full amount)
           cicilan masing-masing sebesar S$806.400                         (equivalent to US$603) and S$806,400 (full
           (nilai penuh) (setara dengan AS$603) dan                        amount) (equivalent to US$601) respectively.
           S$806.400 (nilai penuh) (setara dengan
           AS$601).
Page 108
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/96 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

19.   UTANG BANK (lanjutan)                                   19.   BANK LOANS (continued)

      h.   Perjanjian Pinjaman Properti Komersial                   h.       Commercial Property Loan Agreement
           (lanjutan)                                                        (continued)
           Pada tanggal 30 September 2024, saldo                             As at 30 September 2024, the outstanding
           pinjaman yang terutang dari fasilitas ini adalah                  balance of this loan facility was S$8,691,100
           sebesar S$8.691.100 (nilai penuh) (setara                         (full amount) (equivalent to US$6,787)
           dengan AS$6.787) (31 Desember 2023:                               (31 December 2023: S$9,497,500 (full
           S$9.497.500 (nilai penuh) (setara dengan                          amount) (equivalent to US$7,203)) which is
           AS$7.203)) dan dibayarkan dengan jadwal                           repayable according to the following
           pembayaran sebagai berikut:                                       schedule:
                              Jadwal pembayaran kembali/                             Jumlah pembayaran
                                 Repayment schedule                                       kembali/
                                      (tahun/year)                                   Repayment amount

                                            2024                                                         209
                                            2025                                                         840
                                            2026                                                         840
                                            2027                                                         840
                                            2028                                                         840
                                            2029                                                         840
                                            2030                                                         840
                                            2031                                                         840
                                            2032                                                         698

                                            Total                                                      6,787
           AIS harus memenuhi beberapa persyaratan                           AIS is required to comply with certain terms
           dan ketentuan yang ditetapkan dalam Surat                         and conditions set out in the UOB Bank
           Penawaran UOB Bank Limited Singapore.                             Limited Singapore. Letter of Offer. As at
           Pada tanggal 30 September 2024 dan                                30 September 2024 and 31 December 2023,
           31 Desember 2023, AIS telah memenuhi                              AIS had complied with the related terms and
           persyaratan dan ketentuan tersebut.                               conditions.
      i.   Perjanjian Fasilitas Rp260.000.000.000                   i.       Rp260,000,000,000 Facility Agreement
           Pada tanggal 26 Februari 2024, ATM                                On 26 February 2024, ATM signed a Loan
           menandatangani Perjanjian Pinjaman sebesar                        Agreement of Rp260,000,000,000 (full
           Rp260.000.000.000 (nilai penuh) dengan                            amount) with PT Bank Permata Tbk (“Loan
           PT Bank Permata Tbk (“Perjanjian Pinjaman”).                      Agreement”).
           Fasilitas pinjaman ini akan digunakan untuk                       This loan facility will be used to finance the
           membiayai proyek Sistem Penyediaan Air                            Sukatani Drinking Water Supply System
           Minum (“SPAM”) Sukatani dengan Kapasitas                          (“SPAM”) project with a capacity of 2x100 litres
           2x100 liter per detik, membiayai proyek                           per second, finance the Non-Revenue Water
           Penurunan Air Tak Berekening di Wilayah                           Reduction project in the North Area of
           Utara Kota Bandung, membayar kembali                              Bandung City, repaying several of ATM’s
           pinjaman beberapa anak perusahaan ATM,                            subsidiaries’ loans, and paying transaction
           serta membayar biaya transaksi dan biaya lain                     fees and other costs related to this Loan
           yang     berhubungan     dengan   Perjanjian                      Agreement.
           Pinjaman ini.
           Fasilitas      pinjaman    ini   terdiri   dari:                  This loan facility consists of: (i) a term loan
           (i) fasilitas pinjaman berjangka sebesar                          facility of Rp220,000,000,000 (full amount)
           Rp220.000.000.000 (nilai penuh) yang akan                         maturing within 108 months from the date of
           jatuh tempo dalam jangka waktu 108 bulan                          this Loan Agreement; and (ii) a revolving loan
           sejak tanggal Perjanjian Pinjaman ini; dan                        facility of Rp40,000,000,000 (full amount)
           (ii)    fasilitas    pinjaman revolving sebesar                   which will mature within 60 months from the
           Rp40.000.000.000 (nilai penuh) yang akan                          date of this Loan Agreement. This facility is
           jatuh tempo dalam jangka waktu 60 bulan                           subject to interest in the amount of JIBOR plus
           sejak tanggal Perjanjian Pinjaman ini. Fasilitas                  a certain percentage and is bound by collateral
           ini dikenakan bunga sebesar JIBOR ditambah                        in the form of pledge of ATM’s and its
           persentase tertentu dan diikat dengan jaminan                     subsidiary’s shares.
           berupa gadai saham yang dimiliki ATM dan
           anak perusahaannya.
Page 109
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/97 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)
      i.   Perjanjian    Fasilitas   Rp260.000.000.000             i.       Rp260,000,000,000       Facility   Agreement
           (lanjutan)                                                       (continued)
           Selama periode sembilan bulan yang berakhir                      During the nine-month period ended
           pada tanggal 30 September 2024, ATM                              30 September 2024, ATM made drawdowns of
           melakukan          penarikan        sebesar                      Rp85,805,598,666 (full amount) (equivalent to
           Rp85.805.598.666 (nilai penuh) (setara                           US$5,460) on the term loan facility. As at
           dengan AS$5.460) atas fasilitas pinjaman                         30 September 2024, the outstanding balance
           berjangka.            Pada           tanggal                     of this loan facility was Rp85,805,598,666 (full
           30 September 2024, saldo pinjaman yang                           amount) (equivalent to US$5,668) and is
           terutang dari fasilitas pinjaman ini adalah                      repayable according to the following schedule:
           sebesar Rp85.805.598.666 (nilai penuh)
           (setara dengan AS$5.668) dan harus
           dibayarkan    kembali      dengan     jadwal
           pembayaran sebagai berikut:
                               Jadwal pembayaran kembali/                           Jumlah pembayaran
                                  Repayment schedule                                     kembali/
                                      (tahun/year)                                  Repayment amount
                                           2024                                                          13
                                           2025                                                          77
                                           2026                                                         399
                                           2027                                                         618
                                           2028                                                         670
                                           2029                                                         877
                                           2030                                                         927
                                           2031                                                         927
                                           2032                                                       1,160
                                           Total                                                      5,668
           Pada tanggal 25 Oktober 2024, ATM dan                            On 25 October 2024, ATM and PT Bank
           PT Bank Permata Tbk telah menandatangani                         Permata Tbk signed Amendment I of
           Addendum I atas Perjanjian Pinjaman                              Rp260,000,000,000 Loan Agreement related
           Rp260.000.000.000 sehubungan dengan                              with provisions regarding the change of control
           ketentuan perubahan pengendalian ATM dan                         of ATM and its several subsidiaries,
           beberapa anak perusahaannya, yang semula                         transferring control from the Company to AAI.
           Perusahaan menjadi AAI.
           Fasilitas pinjaman ini mensyaratkan ATM                          This loan facility requires ATM to maintain
           untuk menjaga rasio keuangan tertentu dan                        certain financial ratios and comply with several
           memenuhi beberapa syarat dan ketentuan                           terms and conditions stated in the Loan
           yang tercantum dalam Perjanjian Pinjaman.                        Agreement. As at 30 September 2024, ATM
           Pada tanggal 30 September 2024, ATM telah                        had complied with the financial ratios and
           memenuhi rasio keuangan dan persyaratan                          related terms and conditions.
           dan ketentuan tersebut.
      j.   Perjanjian Kredit Rp144.770.529.123                     j.       Rp144,770,529,123 Credit Agreement
           Pada    tanggal   25     Mei      2023,   ATB                    On 25 May 2023, ATB entered into a Credit
           menandatangani Perjanjian Kredit sebesar                         Agreement of Rp144,770,529,123 (full
           Rp144.770.529.123 (nilai penuh) dengan                           amount) with PT Bank Central Asia Tbk which
           PT Bank Central Asia Tbk termasuk juga di                        includes a Bank Guarantee facility of
           dalamnya fasilitas Bank Garansi sebesar                          Rp7,500,000,000 (full amount). APM acts as a
           Rp7.500.000.000 (nilai penuh). APM bertindak                     guarantor for this loan facility.
           sebagai penjamin atas fasilitas pinjaman ini.
           Fasilitas pinjaman ini digunakan untuk                           This loan facility is utilised to finance the
           membiayai proyek SPAM Brayan Kota Medan                          Brayan Medan City SPAM project with a
           dengan kapasitas 500 liter per detik. Fasilitas                  capacity of 500 litres per second. This loan
           pinjaman ini dikenakan suku bunga sebesar                        facility is subject to an interest rate of JIBOR
           JIBOR ditambah persentase tertentu per tahun                     plus a certain percentage per annum and will
           dan akan jatuh tempo dalam jangka waktu                          mature within a period of eleven years from the
           sebelas tahun sejak tanggal dilakukannya                         date of the first loan drawdown of the loan
           pencairan pertama atas fasilitas pinjaman.                       facility.
Page 110
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/98 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

19.   UTANG BANK (lanjutan)                                19.   BANK LOANS (continued)

      j.   Perjanjian    Kredit     Rp144.770.529.123            j.       Rp144,770,529,123      Credit     Agreement
           (lanjutan)                                                     (continued)

           Pinjaman ini dijamin dengan jaminan berupa                     The loan is secured with pledges of ATM’s and
           gadai saham ATM dan ATS di ATB, gadai atas                     ATS’ shares in ATB, pledge of ATB’s bank
           rekening bank ATB, jaminan fidusia atas hasil                  accounts, fiduciary security over the proceeds
           klaim asuransi, jaminan fidusia atas bank                      of insurance claims, fiduciary security over
           garansi, jaminan fidusia atas hak tagih                        bank guarantees, fiduciary security over right
           Perjanjian Kerja Sama dengan Perusahaan                        to claim under the Cooperation Agreement
           Umum Daerah Tirtanadi, jaminan fidusia atas                    with Perusahaan Umum Daerah Tirtanadi,
           mesin dan peralatan, jaminan fidusia atas                      fiduciary security over machineries and
           piutang dan hak tanggungan atas tanah ATB                      equipment, fiduciary security over receivables
           yang digunakan sebagai area proyek.                            and mortgages over ATB’s land which is
                                                                          designated for the project area.

           Selama periode sembilan bulan yang berakhir                    During the nine-month period ended
           pada tanggal 30 September 2024 dan 2023,                       30 September 2024 and 2023, ATB made
           ATB melakukan penarikan masing-masing                          drawdowns of Rp46,135,006,894 (full amount)
           sebesar Rp46.135.006.894 (nilai penuh)                         (equivalent to US$2,895) on the term loan
           (setara     dengan      AS$2.895)      dan                     facility and US$ Rp10,209,769,249 (full
           Rp10.209.769.249 (nilai penuh) (setara                         amount) (equivalent to US$666), respectively.
           dengan AS$666) atas fasilitas pinjaman                         As at 30 September 2024, the outstanding
           berjangka. Pada tanggal 30 September 2024,                     balance     of   this   loan   facility  was
           saldo pinjaman yang terutang dari fasilitas
                                                                          Rp60,282,158,006 (full amount) (equivalent to
           pinjaman      ini      adalah      sebesar
                                                                          US$3,982)          (31 December         2023:
           Rp60.282.158.006 (nilai penuh) (setara
           dengan AS$3.982) (31 Desember 2023:                            Rp14,147,151,112 (full amount) (equivalent to
           Rp14.147.151.112 (nilai penuh) (setara                         US$918)) and is repayable according to the
           dengan AS$918)) dan harus dibayarkan                           following schedule:
           kembali dengan jadwal pembayaran sebagai
           berikut:

                              Jadwal pembayaran kembali/                          Jumlah pembayaran
                                 Repayment schedule                                    kembali/
                                     (tahun/year)                                 Repayment amount

                                          2025                                                        20
                                          2026                                                       139
                                          2027                                                       334
                                          2028                                                       393
                                          2029                                                       448
                                          2030                                                       493
                                          2031                                                       543
                                          2032                                                       567
                                          2033                                                       597
                                          2034                                                       448

                                          Total                                                    3,982

           Pada tanggal 16 Oktober 2024, ATB dan                          On 16 October 2024, ATB and PT Bank
           PT Bank     Central   Asia    Tbk    telah                     Central Asia Tbk signed First Amendment of
           menandatangani Perubahan Pertama atas                          Rp144,770,529,123 Credit Agreement related
           Perjanjian    Kredit    Rp144.770.529.123                      with changes to shareholding provisions,
           sehubungan dengan perubahan ketentuan                          modifying the direct and indirect shareholding
           terkait dengan kepemilikan saham, yang                         from the Company in ATB and APM to direct
           semula kepemilikan saham baik langsung                         and indirect shareholding by AAI in ATB and
           maupun tidak langsung Perusahaan di ATB                        APM.
           dan APM, menjadi kepemilikan saham baik
           langsung maupun tidak langsung AAI di ATB
           dan APM.
Page 111
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/99 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

19.   UTANG BANK (lanjutan)                                  19.   BANK LOANS (continued)

      j.   Perjanjian     Kredit     Rp144.770.529.123             j.       Rp144,770,529,123         Credit      Agreement
           (lanjutan)                                                       (continued)

           Fasilitas pinjaman ini mensyaratkan ATB untuk                    This loan facility requires ATB to maintain
           menjaga rasio keuangan tertentu dan                              certain financial ratios and comply with several
           memenuhi beberapa syarat dan ketentuan                           terms and conditions stated in the Credit
           yang tercantum dalam Perjanjian Kredit. Pada                     Agreement. As at 30 September 2024 and
           tanggal 30 September 2024 dan 31 Desember                        31 December 2023, ATB had complied with
           2023, ATB telah memenuhi rasio keuangan                          the financial ratios and related terms and
           dan persyaratan dan ketentuan tersebut.                          conditions.

      k.   Perjanjian Fasilitas AS$120.000                         k.       US$120,000 Facility Agreement

           Pada tanggal 18 Mei 2021, AP mengadakan                          On 18 May 2021, AP entered into a Credit
           Perjanjian    Fasilitas      Kredit   sebesar                    Facility Agreement of US$120,000 with a
           AS$120.000 dengan sindikasi bank, yang                           syndicate of banks for which Sumitomo Mitsui
           mana Sumitomo Mitsui Banking Corporation,                        Banking Corporation, Singapore Branch, acts
           Cabang Singapura, bertindak sebagai agen                         as the facility agent. The Company acts as the
           fasilitas. Perusahaan bertindak sebagai                          guarantor of this term loan facility.
           penjamin atas fasilitas pinjaman berjangka ini.

           Fasilitas pinjaman ini digunakan untuk                           This loan facility was used for repaying part of
           pembayaran kembali sebagian dari porsi                           the portion of BPI’s loan facility under the
           fasilitas pinjaman BPI berdasarkan Perjanjian                    US$817,027 Subordinated Term Loan Facility
           Subordinated Term Loan Facility AS$817.027                       Agreement guaranteed by the Company and
           yang dijamin oleh Perusahaan, serta                              paying transaction costs and expenses
           membayar biaya transaksi dan biaya lain yang                     associated with the facility. This facility shall be
           berhubungan dengan fasilitas ini. Fasilitas ini                  repaid in full on the final maturity date of 18
           harus dibayar kembali secara penuh pada                          May 2024.
           tanggal jatuh tempo yaitu 18 Mei 2024.

           Pada tanggal 3 Juli 2023, AP menandatangani                      On 3 July 2023, AP signed an amended and
           perjanjian yang diubah dan dinyatakan                            restated agreement to the US$120,000 Facility
           kembali     terkait    Perjanjian    Fasilitas                   Agreement to change the interest rate from
           AS$120.000 untuk mengubah suku bunga dari                        LIBOR to SOFR. This facility bears interest at
           LIBOR menjadi SOFR. Fasilitas ini dikenakan                      SOFR plus a certain percentage. This facility
           bunga sebesar SOFR ditambah persentase                           is not bound by any collateral.
           tertentu. Fasilitas ini tidak diikat dengan
           jaminan apapun.

           AP telah melakukan pelunasan atas fasilitas                      AP has fully repaid this loan facility in May
           pinjaman ini pada bulan Mei 2024, sehingga                       2024, thus as at 30 September 2024, the
           pada tanggal 30 September 2024, saldo                            outstanding balance of this loan facility was
           pinjaman yang terutang dari fasilitas pinjaman                   US$nil (31 December 2023: US$120,000).
           ini adalah sebesar AS$nihil (31 Desember
           2023: AS$120.000).

           Sesuai dengan ketentuan dalam perjanjian                         In accordance with the facility agreement, AP
           fasilitas, AP diharuskan untuk menjaga                           is required to maintain certain financial ratios.
           beberapa rasio keuangan tertentu. AP juga                        AP is also required to comply with certain
           diharuskan untuk memenuhi beberapa                               terms and conditions with regard to certain
           persyaratan dan ketentuan mengenai hal-hal                       matters regulated in its Articles of Association,
           tertentu yang diatur dalam Anggaran Dasar,                       the general nature of its business, corporate
           sifat umum kegiatan usaha, aksi korporasi,                       actions, financing activities and other matters.
           kegiatan pembiayaan dan lainnya. Pada                            As at 31 December 2023, AP is in compliance
           tanggal 31 Desember 2023, AP telah                               with the financial ratios and related terms and
           memenuhi rasio keuangan dan persyaratan                          conditions.
           dan ketentuan tersebut.
Page 112
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/100 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

19.   UTANG BANK (lanjutan)                                 19.   BANK LOANS (continued)

      l.   Perjanjian Fasilitas AS$100.000                        l.       US$100,000 Facility Agreement

           Pada tanggal 26 Juli 2021, PCS, SCM dan                         On 26 July 2021, PCS, SCM and LSA entered
           LSA mengadakan Perjanjian Pinjaman                              into a Syndicated Loan Agreement of
           Sindikasi sebesar AS$100.000 dengan                             US$100,000 with a syndicate of banks, for
           sindikasi bank, yang mana PT Bank Permata                       which PT Bank Permata Tbk acts as the facility
           Tbk bertindak sebagai agen fasilitas                            agent (“Syndicated Loan Agreement”). The
           (“Perjanjian Pinjaman Sindikasi”). Perusahaan                   Company acts as the guarantor for this loan
           bertindak sebagai penjamin atas fasilitas                       facility.
           pinjaman ini.

           Fasilitas pinjaman ini terdiri dari fasilitas                   This facility consists of an amortising term loan
           pinjaman amortisasi berjangka sebesar                           facility of US$40,000 and a revolving credit
           AS$40.000 dan fasilitas pinjaman revolving                      facility of US$60,000 with a final maturity date
           sebesar AS$60.000 yang akan jatuh tempo                         of 26 July 2026 which is repayable on a
           pada tanggal 26 Juli 2026 dan dibayarkan                        quarterly basis. This facility bears interest at
           setiap kuartal. Fasilitas ini dikenakan bunga                   LIBOR plus a certain percentage. These
           sebesar LIBOR ditambah persentase tertentu.                     facilities are not bound by any collateral.
           Fasilitas ini tidak terikat dengan jaminan
           apapun.

           Fasilitas pinjaman ini akan digunakan untuk                     These loan facilities will be used for repayment
           membayar kembali pinjaman yang diterima                         of loans obtained from the entities’
           dari para pemegang sahamnya, membayar                           shareholders, paying transaction costs and
           biaya transaksi dan biaya lain yang                             expenses associated with the Syndicated
           berhubungan dengan Perjanjian Pinjaman                          Loan Agreement and for other general
           Sindikasi ini dan untuk tujuan korporasi umum                   corporate purposes.
           lainnya.

           PCS telah melakukan penarikan penuh pada                        PCS has made full drawdown on the
           fasilitas pinjaman amortisasi berjangka                         amortising term loan facility. On 26 January
           tersebut. Pada tanggal 26 Januari 2023, PCS                     2023, PCS fully repaid the amortising term
           telah melakukan pelunasan atas fasilitas                        loan facility. Therefore, pursuant to the terms
           pinjaman amortisasi berjangka. Dengan                           and conditions under the Syndicated Loan
           demikian, berdasarkan syarat dan ketentuan                      Agreement, the amortising term loan facility is
           dalam Perjanjian Pinjaman Sindikasi, fasilitas                  no longer able to be re-drawn or re-borrowed,
           pinjaman amortisasi berjangka tidak dapat                       but the revolving credit facility still remains
           ditarik kembali atau dipinjam kembali, namun                    available. As at 30 September 2024 and
           fasilitas pinjaman revolving tetap berlaku.                     31 December 2023, the outstanding balance
           Pada tanggal 30 September 2024 dan                              of this loan facility was US$nil.
           31 Desember 2023, saldo pinjaman yang
           terutang dari fasilitas pinjaman ini adalah
           sebesar AS$nihil.

           Pada 16 Mei 2023, SCM, PCS dan LSA                              On 16 May 2023, SCM, PCS and LSA
           melakukan perubahan Perjanjian Pinjaman                         amended the US$100,000 Syndicated Loan
           Sindikasi AS$100.000 untuk mengubah suku                        Agreement to change the interest rate from
           bunga dari LIBOR menjadi SOFR.                                  LIBOR to SOFR.

           Pada tanggal 5 Juli 2024, SCM, PCS dan LSA                      On 5 July 2024, SCM, PCS and LSA entered
           melakukan perubahan kedua atas Perjanjian                       into the second amendment to the
           Pinjaman Sindikasi AS$100.000 untuk                             US$100,000 Syndicated Loan Agreement to
           melakukan penurunan margin atas suku                            reduce the margin of the interest of revolving
           bunga fasilitas pinjaman revolving yang                         credit facility which will be effective from 2 July
           berlaku efektif sejak tanggal 2 Juli 2024.                      2024.
Page 113
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/101 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

19.   UTANG BANK (lanjutan)                                 19.   BANK LOANS (continued)

      l.      Perjanjian Fasilitas AS$100.000 (lanjutan)          l.       US$100,000 Facility Agreement (continued)

              Sesuai dengan ketentuan dalam Perjanjian                     In accordance with the Syndicated Loan
              Pinjaman Sindikasi, PCS, SCM dan LSA                         Agreement, PCS, SCM and LSA are required
              diharuskan untuk menjaga beberapa rasio                      to maintain certain financial ratios. PCS, SCM
              keuangan tertentu. PCS, SCM dan LSA juga                     and LSA are also required to comply with
              diharuskan untuk memenuhi beberapa                           certain terms and conditions with regard to
              persyaratan dan ketentuan mengenai syarat                    conditions precedent, business activities,
              pendahuluan,    kegiatan    usaha,  tujuan                   purpose of the loan and other matters. As at 30
              penggunaan pinjaman dan lainnya. Pada                        September 2024, PCS, SCM and LSA are in
              tanggal 30 September 2024, PCS, SCM dan                      compliance with the financial ratios and related
              LSA telah memenuhi rasio keuangan dan                        terms and conditions.
              persyaratan dan ketentuan tersebut.


20.   SENIOR NOTES                                          20.   SENIOR NOTES

                                         30 September       31 Desember/
                                             2024           December 2023

      Nilai muka                                 750,000               750,000                                Face value
      Pembelian dari pasar terbuka               (49,957)              (49,957)         Purchases from the open market
      Diskonto dan biaya penerbitan              (15,975)              (15,975)              Discount and issuance cost
      Amortisasi diskonto dan biaya                                                         Amortisation of discount and
         penerbitan                               15,684                13,121                        issuance costs

      Total                                      699,752               697,189                                       Total

      Pada tanggal 31 Oktober 2019, AI menerbitkan                On 31 October 2019, AI issued Guaranteed Senior
      Guaranteed Senior Notes (“Senior Notes”) sebesar            Notes (the “Senior Notes”) amounting to
      AS$750.000, dengan harga penerbitan 98,892%.                US$750,000, with the issue price of 98.892%. The
      Senior Notes akan jatuh tempo pada tahun 2024               Senior Notes will mature in 2024 and bear a fixed
      dengan menanggung tingkat suku bunga tetap 4,25%            interest rate of 4.25%, which is payable semi-annually
      yang dibayarkan secara semi-annual pada tanggal             in arrears on 30 April and 31 October of each year,
      30 April dan 31 Oktober setiap tahun, yang dimulai          commencing on 30 April 2020. The Senior Notes are
      pada tanggal 30 April 2020. Senior Notes tersebut           unconditionally and irrevocably guaranteed by the
      dijamin oleh Perusahaan, tanpa syarat dan tidak             Company.
      dapat dibatalkan.

      Senior Notes tersebut diterbitkan berdasarkan               The Senior Notes were issued under an indenture
      perjanjian antara AI, Perusahaan, dan The Bank of           between AI, the Company and The Bank of New York
      New York Mellon, sebagai wali amanat.                       Mellon, as the trustee.

      Senior Notes per tanggal 30 September 2024 dan              The Senior Notes as at 30 September 2024 and
      31 Desember 2023 mendapatkan peringkat “BBB-”               31 December 2023 are rated “BBB-” by Fitch and
      dari Fitch dan “Ba1” dari Moody’s.                          “Ba1” by Moody’s.

      Hasil dari Senior Notes digunakan untuk pembayaran          The net proceeds of the Senior Notes were used to
      sebagian saldo utang bank AI ketika jatuh tempo             repay a portion of AI’s existing bank loans when they
      sesuai dengan jadwal amortisasinya, untuk                   fell due under their existing amortisation schedules,
      pembayaran utang tambahan, tujuan umum                      for additional debt repayment, general corporate
      perusahaan dan pengeluaran modal Grup.                      purposes and capital expenditures of the Group.
Page 114
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                  Lampiran 5/102 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

20.   SENIOR NOTES (lanjutan)                                  20.   SENIOR NOTES (continued)

      Senior Notes dan Jaminan atas Senior Notes tidak               The Senior Notes and the Guarantee of the Senior
      dijamin dan peringkatnya sejajar dengan semua                  Notes are unsecured and rank equally with all existing
      pinjaman senior AI dan Perusahaan yang tidak                   and future unsecured senior debt of AI and the
      dijamin, baik yang telah ada maupun yang akan                  Company, respectively. The Senior Notes and the
      diterima di kemudian hari. Senior Notes dan Jaminan            Guarantee will, respectively, be effectively
      atas Senior Notes masing-masing disubordinasikan               subordinated to all of AI and the Company existing
      secara efektif atas semua pinjaman dari AI dan                 and future secured debt to the extent of the assets
      Perusahaan yang memiliki jaminan aset, baik yang               securing such debt. The guarantee will be structurally
      telah ada maupun yang akan diterima, sebesar aset              subordinated to all liabilities (including trade
      yang dijaminkan terhadap pinjaman tersebut.                    payables) of all of the Company subsidiaries (other
      Jaminan      tersebut   akan     secara     struktural         than AI), which are not initially issuing guarantees.
      disubordinasikan terhadap semua liabilitas (termasuk
      utang usaha) dari semua entitas anak Perusahaan
      lainnya (selain AI), yang pada mulanya tidak
      menjamin Senior Notes tersebut.

      Perusahaan boleh, di masa yang akan datang,                    The Company may in the future designate its
      menunjuk entitas anaknya yang lain (selain AI) untuk           subsidiaries (other than AI) to guarantee the Senior
      memberikan jaminan atas Senior Notes.                          Notes.

      Senior Notes tersebut terdaftar        di    Singapore         The Senior Notes were listed on the Singapore
      Exchange Securities Trading.                                   Exchange Securities Trading.

      Pada setiap saat, tergantung pada syarat yang                  At any time, depending on the circumstances
      ditentukan dalam indenture, AI dapat dalam satu atau           specified in the indenture, AI may on any one or more
      beberapa kesempatan menarik seluruh atau                       occasions redeem all or a part of the Senior Notes, at
      sebagian dari Senior Notes, pada tingkat harga yang            predetermined redemption prices, plus accrued and
      ditentukan, ditambah dengan bunga yang terutang                unpaid interest.
      dan belum dibayarkan.

      AI dan Perusahaan diharuskan untuk memenuhi                    AI and the Company are required to comply with
      beberapa persyaratan dan ketentuan tertentu                    certain terms and conditions on the incurrence of
      mengenai pengadaan pinjaman dan penerbitan                     indebtedness and issue of disqualified stock, the
      saham yang tidak memenuhi kualifikasi, penunjukan              designation of the Company’s subsidiaries as
      entitas anak Perusahaan sebagai Penjamin                       Subsidiary’s Guarantor, mergers, consolidations and
      (Subsidiary’s Guarantor), merger, konsolidasi dan              sales of assets, certain transactions with affiliates,
      penjualan aset, transaksi tertentu dengan afiliasi,            business activities and other matters. AI and the
      aktivitas bisnis, dan lainnya. AI dan Perusahaan telah         Company are in compliance with the related terms
      memenuhi persyaratan dan ketentuan tersebut.                   and conditions.

      Selama periode sembilan bulan yang berakhir pada               During the nine-month period ended 30 September
      tanggal 30 September 2023, Vindoor, entitas anak               2023, Vindoor, the Company’s indirect subsidiary,
      tidak langsung Perusahaan, membeli sebagian                    purchased a portion of AI’s Senior Notes with the total
      Senior Notes AI dengan total nilai nominal sebesar             nominal amount of US$7,030 from the open market.
      AS$7,030 dari pasar terbuka.

      Lihat Catatan 43(2) untuk informasi nilai wajar dari           Refer to Note 43(2) for information on the fair value of
      Senior Notes pada tanggal 30 September 2024 dan                Senior Notes as at 30 September 2024 and
      31 Desember 2023.                                              31 December 2023.
Page 115
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/103 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

21.    LIABILITAS IMBALAN PASCA KERJA                            21.    POST-EMPLOYMENT BENEFITS LIABILITIES
       Liabilitas imbalan pasca kerja pada tanggal                      Post-employment         benefits    liabilities as     at
       31 Desember 2023 dihitung oleh Kantor Konsultan                  31 December 2023 were calculated by Riana &
       Aktuaria Riana & Rekan, aktuaris independen,                     Partners Actuarial Consulting Firm, independent
       dengan laporan yang diterbitkan pada tahun 2024,                 actuaries, in actuarial reports issued in 2024, while for
       sedangkan untuk jumlah liabilitas imbalan pasca                  the post-employment benefit liabilities recognised in
       kerja yang diakui di laporan keuangan konsolidasian              the interim consolidated financial statements as at 30
       interim pada tanggal 30 September 2024 dan beban                 September 2024 and post-employment benefits
       imbalan kerja untuk periode sembilan bulan yang                  expense for the nine-month periods endend 30
       berakhir pada tanggal 30 September 2024 adalah                   September 2024 are based on the projections
       berdasarkan proyeksi yang dihitung oleh Kantor                   calculated by Riana & Partners Actuarial Consulting
       Konsultan Aktuaria Riana & Rekan.                                Firm.
       Asumsi-asumsi utama yang digunakan dalam                         The principal assumptions used in determining the
       menentukan liabilitas imbalan pasca kerja karyawan               Group’s post-employment benefits liabilities are as
       Grup adalah sebagai berikut:                                     follows:
                                             30 September         31 Desember/
                                                 2024            December 2023

       Tingkat diskonto                      6.50% - 7.00%       6.50% - 7.00%                                       Discount rate
       Tingkat kenaikan gaji                      5%                  5%                                        Salary growth rate
       Umur normal pensiun                        55                  55                                   Normal retirement age
       Tingkat mortalitas dari Tabel                                                           Mortality rate from the Indonesian
         Mortalitas Indonesia                100% TMI IV          100% TMI IV                                    Mortality Table
       Melalui program pensiun imbalan pasti, Grup                      Through its defined benefit pension plans, the Group
       menghadapi sejumlah risiko signifikan sebagai                    is exposed to a number of significant risks which are
       berikut:                                                         detailed below:
       1)    Perubahan tingkat diskonto                                 1) Changes in discount rate
             Penurunan        pada       tingkat   diskonto                  A decrease in discount rate will increase plan
             menyebabkan kenaikan liabilitas program.                        liabilities.
       2)    Tingkat kenaikan gaji                                      2) Salary growth rate
             Liabilitas imbalan pensiun Grup berhubungan                     The Group’s pension obligations are linked to
             dengan tingkat kenaikan gaji, dan semakin                       salary growth rate, and higher salary growth rate
             tinggi tingkat kenaikan gaji akan menyebabkan                   will lead to higher liabilities.
             semakin besarnya liabilitas.
      Sensitivitas liabilitas imbalan pasti terhadap perubahan           The sensitivity of the defined benefit obligation to
      asumsi utama tertimbang pada 30 September 2024                     changes in the weighted principal assumptions as at
      adalah sebagai berikut:                                            30 September 2024 is as follows:
                                                            Dampak terhadap liabilitas
                                                             imbalan pasti/Impact on
                                                            defined benefits obligation
                                   Perubahan              Kenaikan            Penurunan
                                    asumsi/                asumsi/             asumsi/
                                   Change in             Increase in           Decrease
                                  assumptions           assumptions        in assumptions
       Tingkat diskonto                 1%                    (4,753)                 4,726                        Discount rate
       Tingkat kenaikan gaji            1%                     5,304                 (5,335)                  Salary growth rate
       Total liabilitas imbalan pasca kerja yang diakui di               Post-employment benefits liabilities recognised in
       laporan posisi keuangan konsolidasian interim pada                the interim consolidated statements of financial
       tanggal 30 September 2024 dan 31 Desember 2023                    position as at 30 September 2024 and 31 December
       ditentukan sebagai berikut:                                       2023 are computed as follows:
                                             30 September         31 Desember/
                                                 2024            December 2023
       Nilai kini dari kewajiban
        yang didanai                                 11,474                11,079          Present value of funded obligations
       Nilai wajar dari aset program                 (1,479)               (1,402)                   Fair value of plan assets
       Defisit program yang didanai                   9,995                 9,677                     Deficit of the funded plans
       Nilai kini dari kewajiban yang
        tidak didanai                                67,016                64,261       Present value of unfunded obligations
       Total liabilitas                              77,011                73,938                                  Total liability
Page 116
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/104 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

21.   LIABILITAS IMBALAN PASCA KERJA (lanjutan)               21.   POST-EMPLOYMENT         BENEFITS      LIABILITIES
                                                                    (continued)

      Mutasi nilai wajar aset program Grup selama periode           The movement in the Group’s fair value of plan
      berjalan adalah sebagai berikut:                              assets during the period is as follows:

                                         30 September          31 Desember/
                                             2024             December 2023

      Pada awal periode/tahun                       1,402              1,335        At the beginning of the period/year
      Penghasilan bunga dari
        aset program                                   69               100             Interest income on plan assets
      Kerugian atas pengukuran
        kembali:                                                                                 Remeasurement loss:
      Hasil dari aset program, tidak
        termasuk jumlah yang                                                                   Return on plan assets,
        dimasukkan dalam                                                               excluding amount included in
        penghasilan bunga                             (21)               (59)                      interest income
      Perubahan selisih kurs                           29                 26             Foreign exchange difference

      Pada akhir periode/tahun                      1,479              1,402            At the end of the period/year

      Mutasi nilai kini kewajiban imbalan pasti Grup adalah         The movement in the present value of the Group’s
      sebagai berikut:                                              defined benefits obligation is as follows:

                                         30 September          31 Desember/
                                             2024             December 2023

      Pada awal periode/tahun                      75,340             60,623        At the beginning of the period/year
      Biaya jasa kini                               7,499             15,026                       Current service cost
      Biaya bunga                                   3,377              4,149                           Interest expense
      Biaya jasa lalu                               1,028             (2,704)                         Past service cost
      Pengukuran kembali:                                                                            Remeasurements:
      - (Keuntungan)/kerugian dari                                                         (Gain)/loss from change in -
         perubahan asumsi keuangan                   (325)             2,172                    financial assumptions
      - (Keuntungan)/kerugian dari                                                                    (Gain)/loss from -
         penyesuaian pengalaman                      (281)             1,900                 experience adjustments
      - Keuntungan dari perubahan                                                               Gain from changes in -
         asumsi demografi                               -               (332)              demographic assumptions
      Imbalan yang dibayar                         (9,510)            (6,647)                              Benefits paid
      Perubahan selisih kurs                        1,362              1,153              Foreign exchange difference

      Pada akhir periode/tahun                     78,490             75,340            At the end of the period/year

      Mutasi liabilitas imbalan kerja karyawan Grup adalah          The movement in the Group’s post-employment
      sebagai berikut:                                              benefits liabilities is as follows:

                                         30 September          31 Desember/
                                             2024             December 2023

      Pada awal periode/tahun                      73,938             59,288        At the beginning of the period/year
      Biaya jasa kini                               7,499             15,026                       Current service cost
      Biaya bunga, neto                             3,308              4,049                      Interest expense, net
      Biaya jasa lalu                               1,028             (2,704)                         Past service cost
      Pengukuran kembali:                                                                            Remeasurements:
      - (Keuntungan)/kerugian dari                                                        (Gain)/loss from change in -
        perubahan asumsi keuangan                    (325)             2,172                   financial assumptions
      - (Keuntungan)/kerugian dari                                                                   (Gain)/loss from -
        penyesuaian pengalaman                       (281)             1,900                 experience adjustments
      - Hasil dari aset program,
        tidak termasuk jumlah yang                                                            Return on plan assets, -
        dimasukkan dalam                                                               excluding amount included in
        penghasilan bunga                              21                 59                        interest income
      - Keuntungan dari perubahan                                                              Gain from changes in -
        asumsi demografi                                -               (332)            demographic assumptions
      Imbalan yang dibayar                         (9,510)            (6,647)                            Benefits paid
      Perubahan selisih kurs                        1,333              1,127             Foreign exchange difference

      Pada akhir periode/tahun                     77,011             73,938            At the end of the period/year
Page 117
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/105 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

21.   LIABILITAS IMBALAN PASCA KERJA (lanjutan)                 21.       POST-EMPLOYMENT          BENEFITS      LIABILITIES
                                                                          (continued)

      Jumlah yang diakui pada laba rugi adalah sebagai         The amounts recognised in profit or loss are as
      berikut:                                                 follows:
                                                30 September
                                           2024              2023

      Biaya jasa kini                                  7,499                 7,219                        Current service cost
      Biaya bunga, neto                                3,308                 3,217                       Interest expense, net
      Pengukuran kembali:                                                                                   Remeasurements:
      - Keuntungan dari                                                                                   Gain from change -
        perubahan asumsi keuangan                        (47)                     -                in financial assumptions
      - Kerugian dari                                                                                              Loss from -
        penyesuaian pengalaman                             4                     -                 experience adjustments
      Biaya jasa lalu                                  1,028                     -                           Past service cost
      Perubahan selisih kurs                           1,333                   638               Foreign exchange difference

      Total                                           13,125                11,074                                       Total

      Hasil aktual aset program untuk periode yang berakhir               The actual return on plan assets for the period ended
      pada tanggal 30 September 2024 dan 31 Desember                      30 September 2024 and 31 December 2023 were
      2023 adalah kerugian masing-masing sebesar AS$69                    losses of US$69 and US$100, respectively.
      dan AS$100.

      Pada tanggal 30 September 2024 dan 31 Desember                      As at 30 September 2024 and 31 December 2023,
      2023, aset program ditempatkan seluruhnya pada                      the plan assets were fully invested in the money
      instrumen pasar uang yang tidak memiliki harga pasar                market, which did not have a quoted market.
      yang dikutip.

      Durasi rata-rata tertimbang kewajiban imbalan pasti                 The weighted average duration of the defined
      pada akhir tahun pelaporan Grup berkisar antara                     benefits plan obligation at the end of the reporting
      2 sampai dengan 24 tahun.                                           year for the Group is approximately 2 to 24 years.

      Perkiraan analisis jatuh tempo atas imbalan pensiun                 Expected maturity analysis of undiscounted pension
      tidak terdiskonto pada tanggal 30 September 2024                    benefits as at 30 September 2024 is presented
      adalah sebagai berikut:                                             below:

                         Kurang dari       Antara            Antara           Lebih dari
                           1 tahun/      1-2 tahun/        2-5 tahun/          5 tahun/
                          Less than       Between           Between              Over
                            1 year       1-2 years         2-5 years           5 years          Total

      Imbalan pensiun           9,991           8,252            38,604           456,291          513,138      Pension benefits

      Manajemen Grup berpendapat bahwa liabilitas                         The management of the Group believes that the
      imbalan pasca kerja cukup untuk menutupi semua                      estimated liability provided for post-employment
      imbalan pasca kerja yang diatur dalam Peraturan                     benefits is adequate to cover all post-employment
      Ketenagakerjaan atau PP atau PKB.                                   benefits requirements of the Manpower Regulations
                                                                          or CR or CLA.
Page 118
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/106 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

22.   PROVISI  PEMBONGKARAN,    REHABILITASI,                  22.   PROVISION FOR DECOMMISSIONING, MINE
      REKLAMASI DAN PENUTUPAN TAMBANG                                REHABILITATION, RECLAMATION    AND
                                                                     CLOSURE

                                          30 September          31 Desember/
                                              2024             December 2023
      Saldo awal                                  214,568             183,754                          Beginning balance
      Penambahan                                   40,158              41,344                                   Additions
      Realisasi                                   (10,220)            (11,176)                                Realisation
      Akresi                                          532                 634                                  Accretion
      Perubahan selisih kurs                        3,640                  12                 Foreign exchange difference
      Saldo akhir                                 248,678             214,568                              Ending balance
      Dikurangi:                                                                                                   Less:
      Bagian jangka pendek                           3,704              5,802                             Current portion
      Bagian jangka panjang                       244,974             208,766                        Non-current portion
      Penambahan provisi untuk periode yang berakhir pada            The additions in the provision for the period ended
      tanggal 30 September 2024 dialokasikan ke beban                30 September 2024 were allocated to cost of
      pokok pendapatan dan pendapatan/(beban) lain-lain,             revenue and other income/(expenses), net
      neto masing-masing adalah sebesar AS$44.163                    amounting to US$44,163 (for the nine-month period
      (untuk periode sembilan bulan yang berakhir pada               ended 30 September 2023: US$21,085) (Note 30)
      tanggal 30 September 2023: AS$21.085) (Catatan 30)             and (US$4,000) (for the nine-month period ended
      dan (AS$4.000) (untuk periode sembilan bulan yang              30 September 2023: US$3,065), respectively, with
      berakhir pada tanggal 30 September 2023: AS$3.065),            the remaining amount capitalised to mining
      dan sisa saldonya dikapitalisasikan ke properti                properties and fixed assets (Note 37a).
      pertambangan dan aset tetap (Catatan 37a).

      Asumsi utama yang digunakan dalam perhitungan                  The key assumptions used in the calculation of the
      provisi pembongkaran, rehabilitasi, reklamasi, dan             provision for decommissioning, mine rehabilitation,
      penutupan tambang pada tanggal 30 September 2024               reclamation and closure as at 30 September 2024
      dan 31 Desember 2023 adalah sebagai berikut:                   and 31 December 2023 are as follows:
                                          30 September          31 Desember/
                                              2024             December 2023

      Tingkat inflasi                     2.80% - 3.92%        2.50% - 3.20%                                  Inflation rate
      Tingkat diskonto                    5.49% - 7.08%        6.37% - 6.89%                                 Discount rate

      Provisi pembongkaran, rehabilitasi, reklamasi dan              Provision for decommissioning, mine rehabilitation,
      penutupan tambang merupakan provisi yang                       reclamation and closure represents the provision set
      dibuat oleh Grup untuk memenuhi Peraturan                      up by the Group to comply with the Ministerial
      Menteri     Lingkungan     Hidup    dan     Kehutanan          Regulation      of    Environment     and    Forestry
      No. P.59/MENLHK/SETJEN/KUM.1/10/2019 (Catatan                  No. P.59/MENLHK/SETJEN/KUM.1/10/2019 (Note
      40i) dan PP No. 78 (Catatan 3 dan 41) untuk                    40i) and GR No. 78 (Notes 3 and 41) for
      rehabilitasi daerah aliran sungai, aktivitas reklamasi         rehabilitation of the watershed area, reclamation and
      dan pascatambang atas usaha penambangan                        post-mining activities for the coal mining business.
      batubara.

      Provisi pembongkaran ini juga sudah termasuk nilai             Provision for decommissioning also includes the
      provisi pembongkaran Pit Crushing and Conveying                provision for dismantling of the Pit Crushing and
      system (“PCC”). Grup mengakui penyisihan                       Conveying (“PCC”) system. The Group recognised
      pembongkaran PCC sebesar AS$6.064 pada tanggal                 the provision for dismantling of the PCC amounting
      30 September 2024 (31 Desember 2023: AS$11.029).               to US$6,064 as at 30 September 2024
      Manajemen berkeyakinan bahwa total provisi atas                (31 December 2023: US$11,029). Management
      pembongkaran PCC merupakan estimasi terbaik saat               believes that the provision for dismantling of the PCC
      ini untuk menutupi arus kas keluar di masa depan               represents the current best estimate to cover future
      sehubungan dengan pembongkaran PCC di masa                     cash outflow in relation to the dismantling of the PCC
      depan. Seluruh kegiatan pembongkaran diharapkan                in the future. All the dismantling activities are
      diselesaikan pada tahun 2025.                                  expected to be completed by 2025.
      Manajemen berkeyakinan bahwa keseluruhan provisi               Management believes that the provision for
      pembongkaran, rehabilitasi, reklamasi dan penutupan            decommissioning, mine rehabilitation, reclamation
      tambang pada tanggal 30 September 2024 dan                     and closure as at 30 September 2024 and
      31 Desember 2023 telah cukup untuk memenuhi                    31 December 2023 is sufficient to meet the
      kewajiban sebagaimana yang diatur pada Peraturan               obligations as stipulated in the Minister of
      Menteri Lingkungan Hidup dan Kehutanan dan                     Environment and Forestry Regulation and GR No.
      PP No. 78 di atas, termasuk biaya pembongkaran                 78, including the dismantling costs of the PCC.
      PCC.
Page 119
                                             PT ADARO ENERGY INDONESIA Tbk
                                        DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                      Lampiran 5/107 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

23. MODAL SAHAM DAN SAHAM TREASURI                                 23.   SHARE CAPITAL AND TREASURY SHARES

   Seluruh saham Perusahaan tercatat di Bursa Efek                       All shares in the Company have been listed on the
   Indonesia sejak 16 Juli 2008. Struktur pemegang                       Indonesia Stock Exchange since 16 July 2008. The
   saham Perusahaan pada tanggal 30 September 2024                       Company’s shareholders as at 30 September 2024
   dan 31 Desember 2023 berdasarkan catatan yang                         and 31 December 2023 based on the records
   dibuat oleh PT Kustodian Sentral Efek Indonesia, biro                 maintained by PT Kustodian Sentral Efek Indonesia,
   administrasi efek, adalah sebagai berikut:                            the share administrator, were as follows:
                                                                                            Persentase
                                                                          Lembar           kepemilikan/
                                                                          saham/            Percentage
                                                                         Number of         of ownership          Jumlah/
                     Pemegang saham/Shareholders                          shares                (%)              Amount
   30 September 2024
   PT Adaro Strategic Investments                                         14,045,425,500            45.66             150,349
   Garibaldi Thohir (Presiden Direktur/President Director)                 1,976,632,710             6.43              21,159
   Edwin Soeryadjaya (Presiden Komisaris/President Commissioner)           1,051,738,544             3.42              11,258
   Theodore Permadi Rachmat (Wakil Presiden Komisaris/
      Vice President Commissioner)                                          812,988,601              2.64                  8,703
   Arini Saraswaty Subianto (Komisaris/Commissioner)                         80,106,250              0.26                    857
   Christian Ariano Rachmat (Wakil Presiden Direktur/
      Vice President Director)                                                16,000,000             0.05                 171
   Julius Aslan (Direktur/Director)                                           11,000,000             0.04                 118
   Iwan Dewono Budiyuwono (Direktur/Director)                                      2,800             0.00                   1
   Pemegang saham lainnya/Other shareholders                              12,764,771,495            41.50             136,640

   Total saham ditempatkan dan disetor penuh/
     Total issued and fully paid shares                                   30,758,665,900           100,00             329,256

   31 Desember/December 2023
   PT Adaro Strategic Investments                                         14,045,425,500            43.91             150,589
   Garibaldi Thohir (Presiden Direktur/President Director)                 1,976,632,710             6.18              21,193
   Edwin Soeryadjaya (Presiden Komisaris/President Commissioner)           1,051,738,544             3.29              11,276
   Theodore Permadi Rachmat (Wakil Presiden Komisaris/
      Vice President Commissioner)                                          812,988,601              2.54                  8,717
   Arini Saraswaty Subianto (Komisaris/Commissioner)                         79,975,750              0.25                    857
   Christian Ariano Rachmat (Wakil Presiden Direktur/
      Vice President Director)                                                16,000,000             0.05                 172
   Julius Aslan (Direktur/Director)                                           11,000,000             0.03                 117
   Chia Ah Hoo (Direktur/Director)                                             9,593,500             0.03                 103
   Pemegang saham lainnya/Other shareholders                              12,877,851,295            40.27             138,071

   Total saham beredar/Total shares outstanding                           30,881,205,900            96.55             331,095
   Saham treasuri/Treasury shares                                          1,104,756,100             3.45              11,845
   Total saham ditempatkan dan disetor penuh/
     Total issued and fully paid shares                                   31,985,962,000           100.00             342,940

   Saham biasa memberikan hak kepada pemegangnya                         Ordinary shares entitle the holder to participate in
   untuk memperoleh dividen dan hasil dari pembubaran                    dividends and the proceeds on the winding up of the
   Perusahaan sesuai dengan proporsi jumlah lembar dan                   Company in proportion to the number of and
   jumlah yang dibayarkan atas saham yang dimiliki.                      amounts paid on the shares held.

   Pada tanggal 27 September 2021, Perusahaan                            On 27 September 2021, the Company announced its
   mengumumkan rencana pembelian kembali sahamnya                        plan to buyback its shares (“Buyback”) based on the
   (“Pembelian Kembali”) berdasarkan Peraturan Otoritas                  Financial     Services    Authority’s    Regulation
   Jasa Keuangan No. 2/POJK.04/2013 dengan jumlah                        No. 2/POJK.04/2013 for a maximum amount of
   sebanyak-banyaknya sebesar Rp4.000.000.000.000                        Rp4,000,000,000,000 (full amount) (equivalent to
   (nilai penuh) (setara dengan AS$278.280). Program                     US$278,280). The Buyback program was
   Pembelian Kembali dilaksanakan untuk periode 3 (tiga)                 implemented in a period of 3 (three) months, from 27
   bulan, dari tanggal 27 September 2021 sampai dengan                   September 2021 to 26 December 2021. The
   tanggal 26 Desember 2021. Periode Pembelian                           Buyback period was then extended several times,
   Kembali kemudian diperpanjang beberapa kali, dengan                   with the latest period commencing on 14 February
   periode terakhir dilaksanakan pada 14 Februari 2023                   2023 to 12 May 2023.
   sampai dengan 12 Mei 2023.
Page 120
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/108 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

23.   MODAL SAHAM DAN SAHAM TREASURI (lanjutan)              23.   SHARE CAPITAL AND TREASURY SHARES
                                                                   (continued)

      Pada tanggal 11 Mei 2023, Perusahaan mendapatkan             On 11 May 2023, the Company obtained the
      persetujuan dari Rapat Umum Pemegang Saham                   approval from its Annual General Meeting of
      Tahunan (“RUPST”) Perusahaan untuk melakukan                 Shareholders (“AGMS”) to conduct the Buyback
      Pembelian Kembali berdasarkan Peraturan Otoritas             based on the Financial Services Authority’s
      Jasa Keuangan No. 30/POJK.04/2017 dengan periode             Regulation No. 30/POJK.04/2017 for the Buyback
      pelaksanaan Pembelian Kembali selama 18 (delapan             period of 18 (eighteen) months from 12 May 2023 to
      belas) bulan terhitung sejak tanggal 12 Mei 2023             12 November 2024.
      sampai dengan 12 November 2024.

      Selama periode sembilan bulan yang berakhir                  During the nine-month period ended 30 September
      30 September 2024 dan 2023, Perusahaan                       2024 and 2023, the Company conducted the
      melakukan Pembelian Kembali melalui Bursa Efek               Buyback through the Indonesia Stock Exchange of
      Indonesia masing-masing sejumlah 122.540.000                 122,540,000 shares amounted to Rp292 billion (full
      lembar saham sebesar Rp292 miliar (nilai penuh) atau         amount) or equivalent to US$18,711 and
      setara dengan AS$18.711 dan 104.756.100 lembar               104,756,100 shares amounted to Rp274 billion (full
      saham sebesar Rp274 miliar (nilai penuh) atau setara         amount) or equivalent to US$18,372, respectively.
      dengan AS$18.372. Sampai dengan tanggal 30                   Up to 30 September 2024, total Buyback was
      September 2024, jumlah Pembelian Kembali adalah              1.277.296.100 shares (up to 31 December 2023:
      sebesar 1.277.296.100 lembar saham (sampai                   1,104,756,100 shares). The total amount paid to
      dengan 31 Desember 2023: 1.104.756.100 lembar                acquire the shares was Rp2,571 billion (full amount)
      saham). Total pembayaran untuk mengakuisisi saham            or equivalent to US$177,019 (31 December 2023:
      tersebut adalah sebesar Rp2.571 miliar (nilai penuh)         Rp2,279 billion (full amount) or equivalent to
      atau setara dengan AS$177.019 (31 Desember 2023:             US$158,308).
      Rp2.279 miliar (nilai penuh) atau setara dengan
      AS$158.308).

      Pada tanggal 15 Mei 2024, telah diadakan RUPST               On 15 May 2024, the Company’s AGMS was held,
      Perusahaan, dimana Perusahaan telah mendapatkan              whereby the Company obtained the shareholders’
      persetujuan para pemegang saham untuk melakukan              approval to execute the reduction of the issued and
      pengurangan modal ditempatkan dan disetor melalui            paid-up capital by way of the withdrawal of the
      penarikan saham hasil pembelian kembali Perusahaan           shares obtained from the Company’s share buyback
      sejumlah 1.227.296.100 saham atau setara dengan              execution, in the amount of 1,227,296,100 shares, or
      3,84% dari modal ditempatkan dan disetor penuh dalam         equivalent to 3.84% of the Company’s issued and
      Perusahaan. Dengan demikian, modal ditempatkan               paid-up capital. Therefore, the Company’s issued
      dan disetor Perusahaan yang semula berjumlah                 and paid-up capital will reduce from 31,985,962,000
      31.985.962.000 saham menjadi 30.758.665.900                  shares to 30,758,665,900 shares.
      saham.

24. TAMBAHAN MODAL DISETOR, NETO                             24.   ADDITIONAL PAID IN CAPITAL, NET

      Saldo tambahan modal disetor pada tanggal                    The balance of additional paid-in capital as at
      30 September 2024 dan 31 Desember 2023 adalah                30 September 2024 and 31 December 2023 was as
      sebagai berikut:                                             follows:

                                         30 September         31 Desember/
                                             2024            December 2023

      Tambahan modal disetor saat
         Penawaran Umum
         Saham Perdana                         1,219,813           1,219,813          Additional paid-in capital from IPO
      Biaya emisi saham                          (44,532)            (44,532)                      Share issuance costs
      Selisih nilai transaksi                                                         Difference in value of restructuring
         restrukturisasi entitas                                                            transactions of entities under
         sepengendali                            (20,787)            (20,787)                          common control
      Pengurangan modal ditempatkan
         dan disetor                            (163,335)                    -   Reduction of issued and paid-up capital

      Tambahan modal disetor, neto               991,159           1,154,494             Additional paid-in capital, net
Page 121
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/109 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

24.   TAMBAHAN MODAL DISETOR, NETO (lanjutan)                  24.   ADDITIONAL PAID IN CAPITAL, NET (continued)

      Tambahan modal disetor saat Penawaran Umum                     The additional paid-in capital from the IPO resulted
      Saham Perdana berasal dari Penawaran Umum                      from the IPO in 2008.
      Saham Perdana yang dilakukan pada tahun 2008.


25.   SELISIH TRANSAKSI         DENGAN      PIHAK     NON-     25.   DIFFERENCE IN VALUE FROM TRANSACTIONS
      PENGENDALI                                                     WITH NON-CONTROLLING INTEREST

      Pada tanggal 12 Mei 2016, AI dan EGATi                         On 12 May 2016, AI and EGATi entered into the
      menandatangani Perjanjian Pengambilan Saham                    Subscription Agreement. On 22 November 2016 (the
      Baru. Pada tanggal 22 November 2016 (“Tanggal                  “Closing Date”), AI issued 57,857 shares to EGATi for
      Penutupan”), AI mengeluarkan 57.857 saham kepada               11.53% ownership in AI, with a par value of US$100
      EGATi untuk 11,53% kepemilikan di AI, dengan nilai             (full amount) per share, or a total nominal value
      nominal AS$100 (nilai penuh) per saham, atau dengan            amounting to US$5,786 which has been issued by AI
      total nilai nominal sebesar AS$5.786 yang telah                and subscribed to by EGATi. The total value of the
      dikeluarkan oleh AI dan disetorkan oleh EGATi. Jumlah          transaction is US$325,000. EGATi paid the amount
      nilai transaksi adalah AS$325.000. EGATi membayar              of US$163,500 on the Closing Date and the
      sebesar AS$163.500 pada saat Tanggal Penutupan                 remaining amount (“Deferred Consideration”) will be
      dan sisanya (“Pembayaran yang Ditangguhkan”) akan              paid subject to meeting certain conditions.
      dibayarkan pada saat kondisi tertentu telah terpenuhi.

      Transaksi ini telah disetujui oleh para pemegang               This transaction were approved by AI’ shareholders
      saham AI berdasarkan Akta Notaris Humberg Lie,                 based on Notarial Deed of Humberg Lie, S.H., M.Kn.,
      S.H., S.E., M.Kn., Notaris di Jakarta Utara, No. 141           Notary in North Jakarta, No. 141 dated 22 November
      tertanggal 22 November 2016. Akta ini telah                    2016. This Deed was submitted and received by the
      disampaikan dan diterima oleh Menteri Hukum. dan               Minister of Law and Human Rights of the Republic of
      Hak Asasi Manusia Republik Indonesia dalam Surat               Indonesia in the Letter of Notice No. AHU-AH.01.03-
      Pemberitahuan       No.      AHU-AH.01.03-0100877              0100877 dated 22 November 2016.
      tertanggal 22 November 2016.

      Pada tahun yang berakhir pada tanggal 31 Desember              As at the year ended on 31 December 2023 and
      2023 dan 2022, Grup mencatat Pembayaran yang                   2022, the Group recognised Deferred Consideration
      Ditangguhkan dari EGATi sebagai selisih transaksi              from EGATi as difference in value from transactions
      dengan pihak non-pengendali masing-masing sebesar              with non-controlling interest amounted to US$2,900
      AS$2.900 dan AS$145.800, karena kondisi tertentu               and US$145,800, due to certain conditions on the
      dalam Perjanjian Pengambilan Saham Baru di atas                Subscription Agreement above being fulfilled during
      telah dipenuhi selama tahun tersebut dan menerima              the years and AI has received Deferred
      Pembayaran yang Ditangguhkan dari EGATi sebesar                Consideration Payments from EGATi amounted to
      AS$15.400 dan AS$66.700.                                       US$15,400 and US$66,700.

      Sampai dengan periode sembilan bulan yang berakhir             Up to nine-month periods ended 30 September 2024
      pada tanggal 30 September 2024 dan tahun yang                  and year ended 31 December 2023, remaining
      berakhir pada tanggal 31 Desember 2023, saldo sisa             amount for Deferred Consideration amounted to
      atas Pembayaran yang Ditangguhkan sebesar                      US$66,600 is presented as receivables to
      AS$66.600 disajikan sebagai piutang dari pemegang              shareholders in the interim consolidated statement of
      saham pada laporan posisi keuangan konsolidasian               financial position (Note 7b) and will be paid in
      (Catatan 7b) dan akan dibayarkan berdasarkan                   accordance with the Subscription Agreement.
      Perjanjian Pengambilan Saham Baru.
Page 122
                                          PT ADARO ENERGY INDONESIA Tbk
                                     DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/110 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

26.   SALDO LABA                                               26.    RETAINED EARNINGS

                                                              Belum
                                       Dicadangkan/        dicadangkan/
                                       Appropriated       Unappropriated        Total

      Saldo pada tanggal                                                                                     Balance as at
        1 Januari 2023                         68,588           4,412,865      4,481,453                1 January 2023

      Laba periode berjalan yang                                                                         Profit for the period
        dapat diatribusikan kepada                                                                attributable to owners
        pemilik entitas induk                         -         1,218,898      1,218,898              of the parent entity
      Dividen (Catatan 27)                            -          (500,000)      (500,000)               Dividends (Note 27)

      Saldo pada tanggal                                                                                   Balance as at
        30 September 2023                      68,588           5,131,763      5,200,351           30 September 2023

      Saldo pada tanggal                                                                                     Balance as at
        1 Januari 2024                         68,588           5,151,562      5,220,150                1 January 2024

      Laba periode berjalan yang                                                                         Profit for the period
        dapat diatribusikan kepada                                                                attributable to owners
        pemilik entitas induk                         -         1,182,928      1,182,928              of the parent entity
      Pengukuran kembali                                                                                 Remeasurement of
        liabilitas imbalan pasca                      -               394               394             post employment
        kerja, setelah pajak                                                                           benefit, net of tax
      Dividen (Catatan 27)                            -          (400,000)      (400,000)               Dividends (Note 27)

      Saldo pada tanggal                                                                                   Balance as at
        30 September 2024                      68,588           5,934,884      6,003,472           30 September 2024

      Undang-Undang Perseroan Terbatas Republik                       The Limited Liability Company Law of the Republic of
      Indonesia No. 40/2007 (“UU No. 40/2007”) yang                   Indonesia No. 40/2007 (“UU No. 40/2007”), issued in
      dikeluarkan di bulan Agustus 2007, mengharuskan                 August 2007, requires the establishment of a general
      pembentukan cadangan umum dari laba bersih                      reserve from net income amounting to at least 20% of
      sejumlah minimal 20% dari jumlah modal yang                     a company’s issued and paid-up capital. This general
      ditempatkan dan disetor penuh. Cadangan umum ini                reserve is presented as appropriated retained
      disajikan sebagai saldo laba dicadangkan pada                   earnings in the consolidated statements of financial
      laporan posisi keuangan konsolidasian.                          position.

      Tidak ada batasan waktu untuk membentuk cadangan                There is no time limit on the establishment of the
      tersebut. Perusahaan telah menyisihkan laba bersih              reserve. The Company has set aside net profit
      minimum sejumlah nilai cadangan wajib yang                      minimum up to the amount of the required reserve of
      ditetapkan sebesar 20% dari jumlah modal                        20% of the Company’s issued and paid-up capital as
      ditempatkan dan disetor Perusahaan sebagaimana                  stipulated in Law No. 40/2007.
      diatur dalam UU No. 40/2007.


27.   DIVIDEN                                                   27.   DIVIDENDS

      Pada RUPST Perusahaan yang diadakan pada                        At the Company’s AGMS held on 15 May 2024, total
      tanggal 15 Mei 2024, telah disetujui pembagian dividen          cash dividends for 2023 of US$400,000
      tunai final untuk tahun 2023 sejumlah AS$400.000                (US$0.013/share - full amount) were approved. The
      (AS$0,013/saham - nilai penuh). Dividen tunai final             final cash dividends for 2023 were paid on 5 June
      tahun 2023 ini telah dibayarkan pada tanggal 5 Juni             2024, therefore, as at 30 September 2024, the Group
      2024, sehingga pada tanggal 30 September 2024,                  did not have any outstanding dividends payable
      Grup tidak memiliki saldo utang dividen (31 Desember            (31 December 2023: dividends payable consists of
      2023: utang dividen kepada pemegang saham                       the Company’s dividends payable to shareholders
      Perusahaan sebesar AS$400.000 dan utang dividen                 amounting to US$400,000 and AI’s, SCM’s and
      AI, SCM and LSA kepada pihak non-pengendali                     LSA’s dividends payable to non-controlling interests
      dengan total sebesar AS$29.510).                                totalling to US$29,510).
Page 123
                                                  PT ADARO ENERGY INDONESIA Tbk
                                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 5/111 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                   unless otherwise stated)

27.   DIVIDEN (lanjutan)                                                           27.         DIVIDENDS (continued)

      Pada Rapat Dewan Komisaris dan Direksi                                                   At the Company’s Boards of Commissioners and
      Perusahaan     yang    diadakan   pada    tanggal                                        Directors meeting held on 14 December 2023, interim
      14 Desember 2023, telah disetujui pembayaran                                             cash dividends for 2023 of US$400,000
      dividen tunai interim untuk tahun 2023 sejumlah                                          (US$0.01295/share - full amount) were approved.
      AS$400.000 (AS$0,01295/saham - nilai penuh).                                             The interim cash dividends were paid on 12 January
      Dividen tunai interim ini telah dibayarkan pada                                          2024.
      tanggal 12 Januari 2024.

      Pada RUPST Perusahaan yang diadakan pada                                                 At the Company’s AGMS held on 11 May 2023, total
      tanggal 11 Mei 2023, telah disetujui pembagian                                           cash dividends for 2022 of US$500,000
      dividen tunai final untuk tahun 2022 sejumlah                                            (US$0.01618/share - full amount) were approved.
      AS$500.000 (AS$0,01618/saham - nilai penuh).                                             The final cash dividends for 2022 were paid on 5 June
      Dividen tunai final tahun 2022 ini telah dibayarkan                                      2023.
      pada tanggal 5 Juni 2023.

      Pada Rapat Dewan Komisaris dan Direksi                                                   At the Company’s Boards of Commissioners and
      Perusahaan     yang    diadakan   pada    tanggal                                        Directors meeting held on 21 December 2022, interim
      21 Desember 2022, telah disetujui pembayaran                                             cash dividends for 2022 of US$500,000
      dividen tunai interim untuk tahun 2022 sejumlah                                          (US$0.01613/share - full amount) were approved.
      AS$500.000 (AS$0,01613/saham - nilai penuh).                                             The interim cash dividends were paid on 13 January
      Dividen tunai interim ini telah dibayarkan pada                                          2023.
      tanggal 13 Januari 2023.


28.   KEPENTINGAN NON-PENGENDALI                                                   28.         NON-CONTROLLING INTERESTS

                                                                                                           30 September 2024
                                                                                                                       Bagian atas
                                                                                                                      penghasilan/
                                                                                                                        (kerugian)
                                                                                   Bagian atas                       komprehensif
                                                                                    laba/(rugi)                       lain/Share in         Kehilangan
                                                                Saldo awal/            neto/                              other            pengendalian/       Saldo akhir/
                                                                Beginning          Share in net        Dividen/     comprehensive             Loss of            Ending
                                                                 balance           profit/(loss)      Dividends      income/(loss)            control            balance

      AMI                                                            158,346               54,231                 -                 -                      -         212,577
      AI                                                             128,119               49,099           (90,951)               36                      -          86,303
      Lain-lain (masing-masing dibawah AS$100.000)/
         Others (each below US$100,000)                              349,621               39,429           (63,277)             (177)              (304)            325,292

      Total                                                          636,086              142,759          (154,228)             (141)              (304)            624,172


                                                                                         31 Desember/December 2023
                                                           Penerbitan
                                                        saham entitas
                                                         anak kepada                                                      Bagian atas
                                                         kepentingan                                                     penghasilan/
                                                       non-pengendali/            Akuisisi                                 (kerugian)
                                                          Issuance of          kepentingan                              komprehensif
                                                         subsidiaries’       non-pengendali/        Bagian atas          lain/Share in                            Saldo
                                         Saldo awal/        shares to         Acquisition of         laba neto/              other                                akhir/
                                         Beginning     non-controlling       non-controlling        Share in net       comprehensive           Dividen/          Ending
                                          balance           interests            interests             profit           income/(loss)         Dividends          balance

      AI                                     114,026                     -                   -              83,358                  (68)          (69,197)           128,119
      AMI                                     86,934                     -                   -              71,414                   (2)                -            158,346
      Lain-lain (masing-masing dibawah
         AS$100.000)/Others (each
         below US$100,000)                   301,778            48,571                 (1,129)              58,669               1,251            (59,519)           349,621

         Total                               502,738            48,571                 (1,129)             213,441               1,181           (128,716)           636,086
Page 124
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/112 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

29.    PENDAPATAN USAHA                                        29.     REVENUE

                                                      30 September
                                               2024                  2023

       Pihak ketiga:                                                                                        Third parties:
        Penjualan batubara                                                                               Sales of coal
          Ekspor                                3,483,217             4,098,721                               Export
          Domestik                                751,733               592,466                            Domestic

        Sub-total                               4,234,950             4,691,187                               Sub-total

        Jasa pertambangan                                                                             Mining services
          Domestik                                                                                         Domestic
           Jasa pertambangan                              -             98,702                    Mining services
           Jasa sewa                                      -                 42                    Rental services

        Sub-total                                         -             98,744                                Sub-total

        Lain-lain                                                                                              Others
          Domestik                                  53,444              44,216                              Domestic

       Pihak berelasi:                                                                                    Related parties:
        Penjualan batubara                                                                               Sales of coal
          Domestik                                162,245              145,847                             Domestic

        Jasa pertambangan                                                                            Mining services
          Domestik                                                                                         Domestic
           Jasa sewa                                      6                    8                  Rental services

        Lain-lain                                                                                             Others
          Domestik                                    1,032                 1,094                           Domestic

        Sub-total                                 163,283              146,949                                Sub-total

       Total                                    4,451,677             4,981,096                                     Total

      Rincian   pelanggan    yang    memiliki  transaksi              Details of customers with revenue transactions that
      pendapatan lebih dari 10% dari total pendapatan                 represent more than 10% of the total consolidated
      usaha konsolidasian untuk periode sembilan bulan                revenue for the nine-month periods ended 30
      yang berakhir pada tanggal 30 September 2024 dan                September 2024 and 2023 are as follows:
      2023 adalah sebagai berikut:

                                                      30 September
                                               2024                  2023

      Pihak ketiga:                                                                                          Third party:
        TNB Fuel Services Sdn. Bhd.               730,093              803,527            TNB Fuel Services Sdn. Bhd.

      Lihat Catatan 34 untuk informasi rincian transaksi dan           Refer to Note 34 for information on the details of
      saldo dengan pihak berelasi.                                     transactions and balances with related parties.
Page 125
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/113 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

30.   BEBAN POKOK PENDAPATAN                                 30.    COST OF REVENUE

                                                    30 September
                                             2024                  2023

      Penjualan batubara                                                                                  Sales of coal
        Pertambangan                           1,042,843              984,173                                  Mining
        Royalti kepada Pemerintah                912,622            1,169,626                Royalties to Government
        Pengangkutan dan
          bongkar muat                           311,592             291,218               Freight and handling costs
        Penyusutan (Catatan 10)                  186,368             157,241                   Depreciation (Note 10)
        Pemrosesan batubara                      166,866             240,989                          Coal processing
        Amortisasi properti                                                                            Amortisation of
          pertambangan (Catatan 12)               55,667              43,527            mining properties (Note 12)
        Biaya reklamasi dan penutupan                                                           Mine reclamation and
          tambang (Catatan 22)                    44,163              21,085                closure costs (Note 22)
        Persediaan batubara
          (Catatan 9):                                                                         Coal inventory (Note 9):
          Saldo awal                              78,344              131,920                    Beginning balance
          Saldo akhir                           (136,947)            (158,866)                       Ending balance

      Total beban pokok pendapatan -
        penjualan batubara                     2,661,518            2,880,913        Total cost of revenue - sales of coal

      Jasa pertambangan                                                                                Mining services
        Pemakaian bahan                                 -             39,208                            Consumables
        Penyusutan (Catatan 10)                         -             14,846                   Depreciation (Note 10)
        Perbaikan dan pemeliharaan                      -              9,713                 Repairs and maintenance
        Biaya karyawan                                  -              8,414                          Employee costs
        Subkontraktor                                   -              4,900                           Subcontractors
        Lain-lain                                       -              6,595                                   Others

      Total beban pokok pendapatan -
        jasa pertambangan                               -             83,676      Total cost of revenue - mining services

      Lain-lain                                                                                                  Others
        Penyusutan (Catatan 10)                     6,882                 5,324                 Depreciation (Note 10)
        Pemakaian bahan                             3,475                 4,674                         Consumables
        Jasa perbaikan dan
          pemeliharaan                             1,654               2,277                 Repairs and maintenance
        Lain-lain                                 21,460              16,461                                   Others

      Total beban pokok pendapatan -
        lain-lain                                 33,471              28,736               Total cost of revenue - others

      Total                                    2,694,989            2,993,325                                       Total

      Tidak ada transaksi pembelian kepada satu pemasok             There were no purchase transactions made with any
      dengan total transaksi kumulatif lebih dari 10% dari          single supplier with a cumulative amount exceeding
      total pendapatan usaha konsolidasian untuk periode            10% of the total consolidated revenue for the nine-
      sembilan bulan yang berakhir pada tanggal                     month periods ended 30 September 2024 and 2023.
      30 September 2024 dan 2023.
Page 126
                                          PT ADARO ENERGY INDONESIA Tbk
                                     DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/114 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

31.   BEBAN USAHA                                            31.     OPERATING EXPENSES

                                                     30 September
                                              2024                  2023

      Penjualan dan pemasaran                                                                      Selling and marketing
       Komisi penjualan                          47,591                   82,036                      Sales commission
       Lain-lain                                    135                      106                                Others

       Sub-total                                 47,726                   82,142                                Sub-total

      Umum dan administrasi                                                                   General and administrative
       Biaya karyawan                            85,017                   87,455                        Employee costs
       PNBP dan pendapatan
         pemerintah daerah                                                                PNBP and regional government
         (Catatan 40o)                           42,545                   70,562                 revenue (Note 40o)
       Jasa profesional                          30,170                   17,576                      Professional fees
       Beban kantor                               8,092                    5,511                       Office expenses
       Pajak final                                8,086                    6,618                               Final tax
       Penyusutan (Catatan 10)                    3,945                    6,036                 Depreciation (Note 10)
       Cadangan untuk
         pembayaran penetapan
         Pemerintah                                                                            Allowance for Government
         (Catatan 40m)                                -                   25,241                   charges (Note 40m)
       Lain-lain                                 29,487                   31,263                                  Others

       Sub-total                                207,342               250,262                                    Sub-total

      Total                                     255,068               332,404                                         Total


32.   PENDAPATAN/(BEBAN) LAIN-LAIN, NETO                     32.     OTHER INCOME/(EXPENSES), NET

                                                     30 September
                                              2024                  2023

      Keuntungan/(kerugian) selisih
        kurs, neto                                   7,333                 (9,340)     Foreign exchange gain/(losses), net
      Keuntungan/(kerugian) neto nilai                                                   Net gains/(losses) on fair value of
        wajar atas investasi lain-lain               3,810            (26,062)                         other investments
      Kerugian atas pelepasan                                                                             Loss on disposal
       aset tetap (Catatan 10)                   (3,640)                   (4,088)              of fixed assets (Note 10)
      Lain-lain                                  10,378                     2,782                                    Others

      Total, neto                                17,881                (36,708)                                  Total, net


 33. PERPAJAKAN                                              33.     TAXATION

      a.      Pajak dibayar dimuka                                   a.       Prepaid taxes

                                          30 September        31 Desember/
                                              2024           December 2023

              PPN                               133,460               101,193                                          VAT
              PPh Badan                          11,666                18,169                                           CIT

              Total                             145,126               119,362                                          Total

              Dikurangi: bagian lancar           95,523               103,641                       Less: current portion

              Bagian tidak lancar                49,603                   15,721                      Non-current portion
Page 127
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/115 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

33. PERPAJAKAN (lanjutan)                                   33.   TAXATION (continued)

    b.   Pajak yang bisa dipulihkan kembali                       b.      Recoverable taxes

                                       30 September          31 Desember/
                                           2024             December 2023

         Piutang Pajak Bahan Bakar
            Kendaraan Bermotor
            (“PBBKB”)                                  -               39,196    Vehicle fuel tax (“PBBKB”) receivables

         Piutang PBBKB merupakan saldo PBBKB yang                         The PBBKB receivables represent the balance
         dapat dikompensasi kepada Pemerintah.                            of PBBKB that is reimbursable by the
         Pemerintah telah menetapkan bahwa PBBKB                          Government. The Government has confirmed
         merupakan pajak baru. Oleh karena itu, pajak ini                 that PBBKB is a new tax. Therefore, it is
         dapat dikompensasi menurut PKP2B. Sebagai                        reimbursable according to the provisions of the
         tambahan, berdasarkan Amandemen PKP2B                            CCA. In addition, based on the Amendment to
         (Catatan 1c), dalam hal AI membayar PBBKB,                       the CCA (Note 1c), in the case of AI paying
         AI dapat melakukan kompensasi PBBKB                              PBBKB, AI is allowed to offset PBBKB against
         dimaksud terhadap bagian Pemerintah sebesar                      the Government’s share of 13.5% at the
         13,5% paling cepat 60 hari setelah dilakukan                     soonest 60 days after payment of that PBBKB
         pembayaran PBBKB dimaksud oleh AI.                               is made by AI. Based on the IUPK for the
         Berdasarkan IUPK sebagai Kelanjutan Operasi                      Continuation       of      Contract/Agreement
         Kontrak/Perjanjian, PBBKB yang dibayarkan                        Operation, the PBBKB paid until the end of
         sampai dengan akhir tahun pajak 2022 masih                       2022 fiscal year is still allowed to be offset
         diperbolehkan untuk dikompensasi terhadap                        against the Government’s share.
         bagian Pemerintah.

         Berdasarkan Berita Acara Verifikasi dari                         Based on the Minutes of Verification Result,
         KESDM, KESDM telah setuju bahwa AI dapat                         MoEMR agreed that AI can offset PBBKB to
         melakukan kompensasi piutang PBBKB                               royalty payments that are AI obligations from
         terhadap pembayaran royalti yang menjadi                         the future coal sales amounted to
         kewajiban AI dari penjualan batubara                             Rp405,054,683,941       (full   amount)     (or
         mendatang sebesar Rp405.054.683.941 (nilai                       equivalent to AS$27,666). For the nine-month
         penuh) (atau setara dengan AS$27.666).                           period ended 30 September 2024, AI had
         Selama periode sembilan bulan yang berakhir                      offset PBBKB against royalty payments with
         pada tanggal 30 September 2024, AI telah                         the amount approved by the government
         melakukan kompensasi piutang PBBKB                               mentioned above and the remaining balance is
         terhadap pembayaran royalti sebesar nilai yang                   recorded as part of the cost of sales and other
         disetujui pemerintah tersebut dan sisanya                        expense, net in the interim statement of profit
         dibebankan sebagai bagian dari harga pokok                       or loss.
         pendapatan dan beban lain-lain, neto dalam
         laporan laba rugi interim.

    c.   Utang pajak                                              c.      Taxes payable

                                       30 September          31 Desember/
                                           2024             December 2023

         PPh Badan                               49,476                86,345                                        CIT

         Pajak lain-lain:                                                                                  Other taxes:
         - PPN                                   12,728                10,140                                    VAT -
         - Pajak penghasilan                                                                       Income tax articles -
              pasal 23 dan 26                     7,332                14,444                           23 and 26
         - Pajak tanah                                                                                      Land and -
              dan bangunan                        2,379                     -                          building tax
         - Lain-lain                              3,788                 3,300                                 Others -

          Sub-total                              26,227                27,884                                  Sub-total

          Total                                  75,703            114,229                                         Total
Page 128
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/116 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                  33.    TAXATION (continued)

      d. Beban pajak penghasilan                                    d.       Income tax expense

                                                   30 September
                                            2024                   2023

         Pajak penghasilan kini                305,504               352,492                             Current income tax
         Pajak penghasilan
            tangguhan                              (6,584)               (26,300)                      Deferred income tax
         Beban pajak dari
            penyesuaian pajak                                                           Income tax expense from prior year
            tahun sebelumnya                       1,689                  6,140                        tax adjustments

         Total beban pajak
            penghasilan                                                                                Total consolidated
            konsolidasian                      300,609               332,332                       income tax expense

         Pajak atas laba sebelum pajak penghasilan                           The tax on consolidated profit before income
         konsolidasian berbeda dengan jumlah teoritis                        tax differs from the theoretical amount that
         yang dihitung menggunakan rata-rata tertimbang                      would arise using the weighted average tax
         tarif pajak yang berlaku atas laba masing-masing                    rate applicable to profits of the consolidated
         entitas anak yang dikonsolidasi sebagai berikut:                    subsidiaries as follows:

                                                   30 September
                                            2024                   2023
         Laba sebelum
            pajak penghasilan                                                                     Consolidated profit before
            konsolidasian                    1,626,296              1,710,166                                income tax

         Pajak dihitung dengan tarif                                                                       Tax calculated at
            pajak yang berlaku                 399,913               375,063                         applicable tax rates
         Penghasilan yang telah
            dikenakan pajak final              (177,620)                 (92,817)               Income subject to final tax
         Beban yang tidak dapat
            dikurangkan menurut
            pajak                                90,671                   67,737                 Non-deductible expenses
         Hasil pemeriksaan pajak                  6,342                    2,269                   Tax audit assessments
         Lain-lain                              (18,697)                 (19,920)                                 Others

         Beban pajak penghasilan                                                                     Consolidated income
           konsolidasian                       300,609               332,332                              tax expense
Page 129
                                           PT ADARO ENERGY INDONESIA Tbk
                                      DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/117 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                      30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                            unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                     33.    TAXATION (continued)

      d.   Beban pajak penghasilan (lanjutan)                          d.       Income tax expense (continued)

           Rekonsiliasi antara laba sebelum pajak                               The reconciliation between the consolidated
           penghasilan konsolidasian dengan estimasi                            profit before income tax and estimated
           penghasilan kena pajak konsolidasian adalah                          consolidated taxable income is as follows:
           sebagai berikut:

                                                      30 September
                                               2024                   2023

           Laba sebelum
               pajak penghasilan                                                                    Consolidated profit before
               konsolidasian                    1,626,296              1,710,166                               income tax
           Dikurangi:                                                                                                    Less:
           Laba sebelum pajak
               penghasilan -                                                                        Profit before income tax -
               Entitas anak                    (1,950,510)            (1,715,998)                              Subsidiaries
           Disesuaikan dengan jurnal                                                             Adjustment for consolidation
               eliminasi konsolidasian           374,611                     9,736                      elimination entries
           Rugi sebelum pajak
               penghasilan -                                                                         Loss before income tax -
               Perusahaan                          50,397                    3,904                          the Company

           Koreksi fiskal:                                                                               Fiscal corrections:
           Penghasilan yang telah
              dikenakan pajak final               (16,098)                   (1,016)              Income subject to final tax
           Beban yang tidak dapat
              dikurangkan
              menurut pajak                           9,052                 10,722                 Non-deductible expenses

           Sub-total                                  (7,046)                9,706                                 Sub-total

           Laba kena
              pajak - Perusahaan                   43,351                   13,610           Taxable income - the Company

           Pajak penghasilan kini -                                                                      Current income tax -
               Perusahaan                             8,237                  2,586                          the Company
           Pajak penghasilan kini -                                                                      Current income tax -
               Entitas anak                      297,267                349,906                               Subsidiaries

           Pajak penghasilan kini                                                                              Consolidated
               konsolidasian                     305,504                352,492                       current income tax
Page 130
                                                      PT ADARO ENERGY INDONESIA Tbk
                                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                    Lampiran 5/118 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                                      30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                            unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                                                33.      TAXATION (continued)

      d. Beban pajak penghasilan (lanjutan)                                                         d. Income tax expense (continued)

           Laba kena pajak hasil rekonsiliasi menjadi dasar                                                  The taxable income resulting from the
           dalam pengisian Surat Pemberitahuan Tahunan                                                       reconciliation will become the basis for filing the
           PPh Badan.                                                                                        Annual CIT Return.

           Pajak     penghasilan    sehubungan  dengan                                                       The income tax relating to other comprehensive
           penghasilan komprehensif lain selama periode                                                      income during the period is as follows:
           berjalan adalah sebagai berikut:
                                                           30 September 2024                                            30 September 2023
                                              Sebelum                                                Sebelum
                                               pajak/        Beban pajak/     Setelah pajak/          pajak/              Beban pajak/       Setelah pajak/
                                             Before tax      Tax charges        After tax           Before tax            Tax charges          After tax

           Liabilitas imbalan                                                                                                                                            Post-employment
              pasca kerja                            542             (112)                 430                      -                    -                  -           benefits liabilities


      e.   Aset/(liabilitas) pajak tangguhan                                                        e.           Deferred tax assets/(liabilities)
                                                                                      30 September 2024
                                                                   Dikreditkan/                                Ditransfer ke/
                                                                  (dibebankan)                                     dari aset/
                                                                       pada                                  (liabilitas) pajak
                                                                     laba rugi/                                  tangguhan/
                                                                     Credited/           Dibebankan             Transfer to/
                                                Saldo awal/        (charged) to         pada ekuitas/          from deferred            Saldo akhir/
                                                Beginning             profit or          Charged to              tax assets/              Ending
                                                 balance                loss                equity                (liabilities)           balance

            Aset pajak tangguhan                                                                                                                                        Deferred tax assets
            Properti pertambangan                     32,262                 (5,555)                    -                         -              26,707                     Mining properties
            Aset tetap                                 7,501                  1,600                     -                         1               9,102                        Fixed assets
            Liabilitas imbalan pasca                                                                                                                              Post-employment benefits
              kerja                                   13,546                  1,290              (104)                        (23)               14,709                         liabilities
            Liabilitas sewa                           21,980                 (2,032)                -                           -                19,948                      Lease liabilities
            Penyisihan kerugian                                                                                                                                              Loss allowances
               piutang usaha                              3,591                 (15)                    -                          -              3,576            of trade receivables
            Rugi fiskal yang dibawa                                                                                                                                        Tax losses carried
              ke masa depan                                   -              5,731                      -                          -              5,731                           forward
            Provisi pembongkaran,                                                                                                                                                 Provision for
               rehabilitasi, dan penutupan                                                                                                                      decommissioning, mine
               tambang                                    6,407               (866)                     -                      -                  5,541       rehabilitation and closure
            Lain-lain                                       205              1,423                      -                     40                  1,668                                   Others

            Aset pajak tangguhan -                                                                                                                                   Deferred tax assets at
              akhir periode                           85,492                 1,576               (104)                        18                 86,982          the end of the period

            Liabilitas pajak tangguhan                                                                                                                              Deferred tax liabilities
            Properti pertambangan                   (142,728)                6,606                      -                          -           (136,122)                   Mining properties
            Aset tetap                               (12,951)                 (969)                     -                         (1)           (13,921)                          Fixed assets
            Liabilitas imbalan pasca                                                                                                                              Post-employment benefits
              kerja                                       1,081                (201)               (8)                        23                    895                         liabilities
            Liabilitas sewa                                 414                (533)                -                          -                   (119)                   Lease liabilities
            Penyisihan kerugian                                                                                                                                             Loss allowances
              piutang usaha                                 52                    6                     -                          -                   58          of trade receivables
            Rugi fiskal yang dibawa                                                                                                                                       Tax losses carried
               ke masa depan                                  -                159                      -                          -                159                           forward
            Biaya pinjaman yang                                                                                                                                        Capitalised borrowing
              dikapitalisasi                          (3,322)                  166                      -                          -             (3,156)                              cost
            Cadangan untuk pembayaran
              penetapan                                                                                                                                                    Allowance for
              pemerintah                                  1,714                   -                     -                       -                 1,714            government charges
            Lain-lain                                       208                (226)                    -                     (40)                  (58)                            Others

            Liabilitas pajak tangguhan                                                                                                                            Deferred tax liabilities at
               akhir periode                        (155,532)                5,008                 (8)                        (18)             (150,550)         the end of the period
Page 131
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                           Lampiran 5/119 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                             FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                         30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                      (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                               unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                                     33.      TAXATION (continued)

      e. Aset/(liabilitas) pajak tangguhan (lanjutan)                                     e.       Deferred tax assets/(liabilities) (continued)
                                                                       31 Desember/December 2023
                                                           Dikreditkan/                         Ditransfer ke/
                                                          (dibebankan)                              dari aset/
                                                               pada                           (liabilitas) pajak
                                                             laba rugi/                           tangguhan/
                                                             Credited/         Dikreditkan       Transfer to/
                                           Saldo awal/     (charged) to       pada ekuitas/     from deferred          Saldo akhir/
                                           Beginning          profit or        Credited to        tax assets/            Ending
                                            balance             loss             equity            (liabilities)         balance

          Aset pajak tangguhan                                                                                                                       Deferred tax assets
          Aset tetap                             7,068               123                  -                   310               7,501                       Fixed assets
          Liabilitas imbalan pasca                                                                                                             Post-employment benefits
            kerja                               11,357              1,440              664                     85             13,546                         liabilities
          Properti pertambangan                 38,890             (6,498)               -                   (130)            32,262                     Mining properties
          Liabilitas sewa                       13,502              8,446                -                     32             21,980                      Lease liabilities
          Penyisihan kerugian                                                                                                                             Loss allowances
             piutang usaha                       2,321             1,270                  -                        -            3,591           of trade receivables
          Rugi fiskal yang dibawa                                                                                                                       Tax losses carried
            ke masa depan                           16                (16)                -                        -                   -                       forward
          Provisi pembongkaran,                                                                                                                                Provision for
             rehabilitasi, dan penutupan                                                                                                     decommissioning, mine
             tambang                             7,894             (1,619)                -                   132               6,407      rehabilitation and closure
          Lain-lain                                215                (16)                -                     6                 205                                  Others

          Aset pajak tangguhan -                                                                                                                  Deferred tax assets at
            akhir tahun                         81,263             3,130               664                    435             85,492            the end of the year

          Liabilitas pajak tangguhan                                                                                                              Deferred tax liabilities
          Properti pertambangan               (150,958)             8,100                 -                   130            (142,728)                   Mining properties
          Aset tetap                            (9,552)            (3,089)                -                  (310)            (12,951)                        Fixed assets
          Liabilitas sewa                         (602)             1,048                 -                   (32)                414                    Lease liabilities
          Penyisihan kerugian                                                                                                                             Loss allowances
            piutang usaha                           19                33                  -                        -                  52         of trade receivables
          Biaya pinjaman yang                                                                                                                        Capitalised borrowing
            dikapitalisasi                      (3,543)              221                  -                        -           (3,322)                            cost
          Cadangan untuk pembayaran
            penetapan                                                                                                                                      Allowance for
            pemerintah                               -             1,714                  -                        -            1,714          government charges
          Liabilitas imbalan pasca                                                                                                             Post-employment benefits
            kerja                                  961               156                49                    (85)              1,081                       liabilities
          Provisi pembongkaran,                                                                                                                               Provision for
            rehabilitasi, dan penutupan                                                                                                      decommissioning, mine
            tambang                                102                30                  -                  (132)                 -       rehabilitation and closure
          Lain-lain                                163                51                  -                    (6)               208                                  Others

          Liabilitas pajak tangguhan                                                                                                           Deferred tax liabilities at
             akhir tahun                      (163,410)            8,264                49                   (435)           (155,532)          the end of the year


          Beberapa entitas anak dalam posisi rugi dan                                              Several subsidiaries are in a loss position and
          hanya berfungsi sebagai kantor pusat saja,                                               only function as head offices, so there is a
          sehingga terdapat pembatasan pemakaian rugi                                              limitation on the future use of tax losses carried
          fiskal yang dibawa ke masa depan dan                                                     forward and also uncertainty as to whether the
          ketidakpastian apakah aset pajak tangguhan ini                                           deferred tax assets will be realised. Thus, a
          dapat terealisasi. Karena itu, terdapat aset pajak                                       portion of the deferred tax assets relating to tax
          tangguhan yang berkaitan dengan rugi fiskal                                              losses carried forward and post-employment
          yang dibawa ke masa depan dan liabilitas                                                 benefits liabilities has not been recognised in
          imbalan pasca kerja yang tidak diakui di dalam                                           these      interim     consolidated      financial
          laporan keuangan konsolidasian interim ini.                                              statements.
Page 132
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/120 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                   33.   TAXATION (continued)

      e.   Aset/(liabilitas) pajak tangguhan (lanjutan)             e.       Deferred tax assets/(liabilities) (continued)

           Analisis aset pajak tangguhan adalah sebagai                      The analysis of deferred tax assets is as
           berikut:                                                          follows:

                                         30 September          31 Desember/
                                             2024             December 2023

           Aset pajak tangguhan
             yang akan dipulihkan                                                      Deferred tax assets to be recovered
             dalam 12 bulan                       14,786                  11,526                       within 12 months
           Aset pajak tangguhan
             yang akan dipulihkan                                                      Deferred tax assets to be recovered
             setelah 12 bulan                     72,196                  73,966                        after 12 months

           Total                                  86,982                  85,492                                         Total

           Manajemen berpendapat jika aset pajak                             Management believes that the deferred tax
           tangguhan dapat dipulihkan sesuai dengan                          assets could be recovered within the expected
           periode realisasi yang diekspektasikan.                           realisation period.

           Analisis liabilitas pajak tangguhan adalah                        The analysis of deferred tax liabilities is as
           sebagai berikut:                                                  follows:

                                         30 September          31 Desember/
                                             2024             December 2023

           Liabilitas pajak tangguhan
             yang akan diselesaikan                                                      Deferred tax liabilities to be settled
             dalam 12 bulan                         9,226                  7,980                         within 12 months
           Liabilitas pajak tangguhan
             yang akan diselesaikan                                                      Deferred tax liabilities to be settled
             setelah 12 bulan                    141,324                 147,552                          after 12 months

           Total                                 150,550                 155,532                                         Total

      f.   Administrasi                                             f.       Administration

           Berdasarkan undang-undang perpajakan yang                         Under the taxation laws of Indonesia,
           berlaku di Indonesia, perusahaan-perusahaan                       companies within the Group that are domiciled
           di dalam Grup yang berdomisili di Indonesia,                      in Indonesia, calculate and pay tax on the
           menghitung dan membayar sendiri besarnya                          basis of self assessment. The DGT may
           jumlah pajak yang terutang. DJP dapat                             assess or amend taxes within five years from
           menetapkan atau mengubah pajak dalam batas                        when the tax becomes due.
           waktu lima tahun sejak saat terutangnya pajak.

      g.   Surat ketetapan pajak                                    g.       Tax assessment letters

           Audit pajak Grup                                                  Tax audits of the Group

           Sampai dengan tanggal laporan keuangan                            As at the completion date of these interim
           konsolidasian     interim    ini    diterbitkan,                  consolidated      financial   statements,     the
           Perusahaan, AL, BGN, AP, AMT, ATM, ATS,                           Company, AL, BGN, AP, AMT, ATM, ATS,
           AML, RLI, ASL, ATBI, ACEI, IBT, HBI, IMPT,                        AML, RLI, ASL, ATBI, ACEI, IBT, HBI, IMPT,
           PCS, SCM, LSA, BAS, AMI, LC, dan INS                              PCS, SCM, LSA, BAS, AMI, LC, and INS are
           sedang diaudit DJP berkaitan dengan semua                         being audited by the DGT for all types of taxes
           jenis pajak untuk tahun pajak 2023 dan SMT                        for fiscal year 2023 and SMT for all types of
           untuk semua jenis pajak untuk tahun pajak 2023                    taxes for fiscal year 2023 and 2022. These
           dan 2022. Entitas-entitas ini belum menerima                      entities have not yet received the tax audit
           hasil audit pajak tersebut. Manajemen                             results. Management is of the opinion that the
           berpendapat bahwa hasil audit pajak tersebut                      tax audit results will not have a material impact
           tidak akan berdampak material terhadap                            on the Group’s interim consolidated financial
           laporan keuangan konsolidasian interim Grup                       statements.
           secara material.
Page 133
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/121 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

33.   PERPAJAKAN (lanjutan)                                  33.   TAXATION (continued)

      h.   Tarif pajak                                             h.       Tax rates

           Perusahaan Terbuka yang memenuhi syarat-                          Publicly Listed Companies that fulfil certain
           syarat tertentu dapat memperoleh tarif 3% lebih                   requirements are entitled to obtain a rate 3%
           rendah dari tarif PPh Badan yang berlaku.                         lower than the applicable CIT rate. In the
           Dalam hal Perusahaan memenuhi syarat-syarat                       event that the Company fulfils the
           tersebut, Perusahaan dapat memperoleh tarif                       requirements, the Company can obtain a
           PPh Badan lebih rendah untuk Tahun Pajak                          lower CIT rate for the relevant Fiscal Year.
           yang bersangkutan.


34.   TRANSAKSI      DAN    SALDO     DENGAN       PIHAK     34.   TRANSACTIONS    AND              BALANCES        WITH
      BERELASI                                                     RELATED PARTIES

      a.   Sifat hubungan                                          a.       Nature of relationships

                   Pihak berelasi/                     Sifat hubungan/                          Jenis transaksi/
                   Related parties                  Nature of relationships                   Type of transactions

           PT Adaro Strategic Investments     Pemegang saham mayoritas/                 Setoran modal/
                                                Majority shareholder                       Paid-up capital

           TPI                                Ventura bersama/joint venture             Penjualan batubara, jasa
                                                                                           manajemen dan jasa sewa/
                                                                                           Sales of coal, management
                                                                                           fees and rental services

           BPI                                Ventura bersama/joint venture             Penjualan batubara, jasa
                                                                                           manajemen dan pinjaman
                                                                                           untuk pihak berelasi/
                                                                                           Sales of coal,
                                                                                           management fees
                                                                                           and loans to related parties

           DTP                                Ventura bersama/joint venture             Jasa manajemen dan pinjaman
                                                                                           untuk pihak berelasi/
                                                                                           Management fees and
                                                                                           loans to related parties

           BEP                                Ventura bersama/joint venture             Jasa manajemen/
                                                                                           Management fees

           GTM                                Ventura bersama/joint venture             Pinjaman untuk pihak berelasi dan
                                                                                            jasa manajemen/Loans to
                                                                                            related parties and
                                                                                            management fees

           TCU                                Ventura bersama/joint venture             Piutang lain-lain dan utang usaha/
                                                                                           Other receivables and
                                                                                           trade payables

           Tala Alam Baru (“TAB”)             Pihak berelasi lainnya/                   Pinjaman untuk pihak berelasi/
                                                 other related parties                      Loans to related parties

           Personil manajemen kunci/          Direktur dan Komisaris Grup/              Kompensasi/Compensation
            Key management personnel              Directors and Commissioners
                                                  of the Group
Page 134
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/122 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

34.   TRANSAKSI DAN SALDO               DENGAN      PIHAK    34.   TRANSACTIONS    AND     BALANCES                WITH
      BERELASI (lanjutan)                                          RELATED PARTIES (continued)

      b.   Rincian transaksi dan saldo                             b.       Details of transactions and balances

           Dalam kegiatan usahanya, Grup mengadakan                        In the normal course of business, the Group
           transaksi dengan pihak-pihak berelasi, terutama                 engages in transactions with related parties,
           meliputi transaksi-transaksi pembelian barang                   primarily consisting of purchases of goods
           dan jasa dan transaksi keuangan lainnya.                        and services and other financial transactions.

                                            30 September      31 Desember/
                                                2024         December 2023

           Piutang usaha (Catatan 7a)                                                       Trade receivables (Note 7a)

           Penjualan batubara:                                                                             Sales of coal:
             BPI                                   33,594            45,396                                       BPI
             TPI                                   18,737            20,856                                        TPI

           Jasa manajemen:                                                                           Management fees:
              BPI                                     253                 387                                  BPI
              TPI                                      37                  39                                  TPI
              DTP                                      23                  23                                 DTP
              GTM                                      11                   -                                GTM
              BEP                                       2                   2                                 BEP

           Total                                   52,657               66,703                                     Total

           Persentase terhadap                                                                      As a percentage of
             total aset konsolidasian               0.48%               0.64%              total consolidated assets

           Piutang lain-lain (Catatan 7b)                                                   Other receivables (Note 7b)

           BPI                                     33,434               25,944                                      BPI
           GTM                                        202                   88                                     GTM
           DTP                                         65                   64                                     DTP
           TAB                                         51                    -                                     TAB
           TCU                                         25                    -                                     TCU

           Total                                   33,777               26,096                                     Total

           Dikurangi: bagian lancar                   292                 152                    Less: current portion

           Bagian tidak lancar                     33,485               25,944                    Non-current portion

           Persentase terhadap                                                                      As a percentage of
             total aset konsolidasian               0.31%               0.25%              total consolidated assets

           Pinjaman untuk pihak
            berelasi                                                                            Loans to related parties

           BPI                                    140,594           140,594                                         BPI
           GTM                                      3,197             3,043                                        GTM
           TAB                                      2,151                 -                                        TAB

           Total                                  145,942           143,637                                        Total

           Dikurangi: bagian lancar                 2,151                    -                   Less: current portion

           Bagian tidak lancar                    143,791           143,637                       Non-current portion

           Persentase terhadap                                                                      As a percentage of
             total aset konsolidasian               1.34%               1.37%              total consolidated assets
Page 135
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/123 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

34.   TRANSAKSI DAN SALDO            DENGAN       PIHAK    34.   TRANSACTIONS    AND      BALANCES                 WITH
      BERELASI (lanjutan)                                        RELATED PARTIES (continued)

      b. Rincian transaksi dan saldo (lanjutan)                  b.    Details of      transactions     and    balances
                                                                       (continued)

                                        30 September        31 Desember/
                                            2024           December 2023

         Utang usaha (Catatan 15)                                                             Trade payables (Note 15)

         TCU                                        109                      -                                      TCU

         Persentase terhadap
          total liabilitas                                                                        As a percentage of
          liabilitas konsolidasian                0.01%                      -          total consolidated liabilities

          Pada tanggal 25 Mei 2021, AP menandatangani                   On 25 May 2021, AP entered into a Shareholder
          Perjanjian Pinjaman Pemegang Saham dengan                     Loan Agreement with BPI to provide a
          BPI untuk memberikan pinjaman kepada BPI                      US$140,594 loan facility to BPI. This loan
          sebesar AS$140.594. Perjanjian pinjaman ini                   agreement is in line with the Equity Support
          sesuai dengan Perjanjian Dukungan Ekuitas                     Agreement dated 3 June 2016 in respect of the
          tertanggal 3 Juni 2016 terkait proyek Central                 Central Java Power Plant (“CJPP”) project (Note
          Java Power Plant (“CJPP”) (Catatan 40u) yang                  40u) as signed by among others AP (as
          ditandatangani antara lain oleh AP (sebagai                   Shareholder), the Company (as Sponsor),
          Pemegang Saham), Perusahaan (sebagai                          Mizuho Bank, Ltd (as Global Facilities Agent)
          Sponsor), Mizuho Bank, Ltd (sebagai Agen                      and MUFG Bank Ltd (as Offshore Security
          Fasilitas Global) dan MUFG Bank Ltd (sebagai                  Agent).
          Agen Jaminan Luar Negeri).

          Pinjaman yang diberikan oleh AP tersebut tidak                The loan provided by AP has no maturity date.
          memiliki tanggal jatuh tempo, namun dapat                     However, it may be repaid at any time at AP’s
          dilunasi kapan saja atas permintaan AP atau                   request or at the option of BPI, provided certain
          opsi BPI, selama kewajiban-kewajiban keuangan                 financial covenants under senior financing
          tertentu berdasarkan dokumen pembiayaan                       documents of BPI have been fulfilled. The loan
          senior BPI sudah terpenuhi. Pinjaman dimaksud                 bears interest at a certain percentage per
          dikenakan bunga dengan persentase tertentu                    annum. This facility is not bound by any
          per tahun. Fasilitas ini tidak terikat dengan                 collateral.
          jaminan apapun.

          Manajemen      Grup    berpendapat   bahwa                    The Group’s management is of the opinion that
          penurunan nilai atas pinjaman untuk pihak                     the impairment of loans to related parties as at
          berelasi pada tanggal 30 September 2024 dan                   30 September 2024 and 31 December 2023 is
          31 Desember 2023 tidak material sehingga                      not material. Therefore, provision for ECL is not
          cadangan kerugian kredit ekspektasian tidak                   considered necessary.
          diperlukan.
Page 136
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/124 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                   30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                         unless otherwise stated)

34.   TRANSAKSI DAN SALDO              DENGAN       PIHAK    34.    TRANSACTIONS    AND      BALANCES                 WITH
      BERELASI (lanjutan)                                           RELATED PARTIES (continued)

      b.   Rincian transaksi dan saldo (lanjutan)                   b.    Details of      transactions     and    balances
                                                                          (continued)

           Lihat Catatan 43(2) untuk informasi nilai wajar                 Refer to Note 43(2) for information on the fair
           dari pinjaman untuk pihak berelasi pada tanggal                 value of loans to related parties as at
           30 September 2024 dan 31 Desember 2023.                         30 September 2024 and 31 December 2023.

                                                    30 September
                                             2024                  2023

           Pendapatan usaha
             (Catatan 29)                                                                                Revenue (Note 29)
           Penjualan batubara:                                                                               Sales of coal:
              BPI                               145,446              124,767                                        BPI
              TPI                                16,799               21,080                                        TPI

           Jasa sewa:                                                                                      Rental services:
              TPI                                       6                      8                                     TPI

           Lain-lain:                                                                                               Others:
              BPI                                     730                   800                                      BPI
              TPI                                     253                   251                                      TPI
              BEP                                      22                    24                                     BEP
              DTP                                      18                    19                                     DTP
              GTM                                       9                     -                                     GTM

           Total                                163,283              146,949                                          Total

           Persentase terhadap total
             pendapatan usaha                                                                         As a percentage of
             konsolidasian                          3.67%                 2.95%             total consolidated revenue

           Penghasilan keuangan                                                                            Finance income
           BPI                                      7,490                 7,463                                        BPI
           GTM                                        216                    32                                      GTM
           TAB                                         76                     -                                       TAB
           DTP                                          -                   150                                       DTP

           Total                                    7,782                 7,645                                       Total

           Persentase terhadap total
             penghasilan keuangan                                                               As a percentage of total
             konsolidasian                          6.38%                 7.83%           consolidated finance income

           Kebijakan harga Grup untuk transaksi dengan                      The Group’s pricing policy for transactions with
           pihak berelasi ditetapkan berdasarkan pada                       related parties is set based on contracted
           harga di dalam kontrak.                                          prices.
Page 137
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/125 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

34.    TRANSAKSI DAN SALDO             DENGAN      PIHAK   34.      TRANSACTIONS    AND     BALANCES                 WITH
       BERELASI (lanjutan)                                          RELATED PARTIES (continued)

       c.   Kompensasi manajemen kunci                              c.     Key management compensation

            Dewan Komisaris dan Direksi Grup merupakan                     The Boards of Commissioners and Directors of
            personil manajemen kunci.                                      the Group are considered key management
                                                                           personnel.

            Kompensasi untuk Dewan Komisaris dan Direksi                   The compensation for the Boards of
            Grup untuk periode sembilan bulan yang                         Commissioners and Directors of the for the nine-
            berakhir pada tanggal 30 September 2024 dan                    month periods ended 30 September 2024 and
            2023, adalah sebagai berikut:                                  2023, was as follows:

                                                   30 September
                                            2024                  2023

            Remunerasi                           26,316                  28,764                           Remuneration
            Imbalan pasca kerja                     838                     853                 Post-employment benefits

            Total                                27,154                  29,617                                       Total

            Dewan Komisaris dan Direksi tidak menerima                     The Boards of Commissioners and Directors do
            kompensasi lain seperti rencana opsi saham                     not receive any other compensation such as
            manajemen.                                                     management stock options.


35.    LABA PER SAHAM DASAR DAN DILUSIAN                   35.      BASIC AND DILUTED EARNINGS PER SHARE

                                                   30 September
                                            2024                  2023

      Laba konsolidasian interim
        periode berjalan yang dapat                                                Interim consolidated profit for the period
        diatribusikan kepada                                                                  attributable to the owners
        pemilik entitas induk                1,182,928             1,218,898                          of the parent entity
      Rata-rata tertimbang jumlah
        saham biasa yang beredar                                                              Weighted average number of
        (dalam ribuan                                                                       ordinary shares outstanding
        lembar saham)                       30,773,593            30,929,593                    (in thousands of shares)

      Laba per saham dasar dan                                                      Basic and diluted earnings per share
        dilusian yang dapat                                                                attributable to the owners
        diatribusikan kepada pemilik                                                               of the parent entity
        entitas induk (nilai penuh)             0.03844             0.03941                               (full amount)

      Perusahaan tidak memiliki efek berpotensi dilusi              The Company does not have any potentially dilutive
      saham sehingga laba per saham dasar sama dengan               shares. Therefore, the diluted earnings per share is
      laba per saham dilusian.                                      equal to the basic earnings per share.
Page 138
                                              PT ADARO ENERGY INDONESIA Tbk
                                         DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                           Lampiran 5/126 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                   unless otherwise stated)

36.   ASET DAN LIABILITAS MONETER NETO DALAM                                     36.           NET MONETARY ASSETS AND LIABILITIES
      MATA UANG ASING                                                                          DENOMINATED IN FOREIGN CURRENCIES

      Pada tanggal 30 September 2024 dan 31 Desember                                           As at 30 September 2024 and 31 December 2023,
      2023, Grup memiliki aset dan liabilitas moneter dengan                                   the Group had monetary assets and liabilities
      mata uang selain Dolar AS sebagai berikut:                                               denominated in currencies other than US Dollars as
                                                                                               follows:
                                                                              30 September 2024
                                                                                                                            Jumlah setara
                                                                                                                          ribuan Dolar AS/
                                                                S$                  Euro                    A$               Equivalent
                                        Dalam/in          (nilai penuh/        (nilai penuh/          (nilai penuh/         in thousands
                                         Rp’000           full amount)         full amount)           full amount)          of US Dollars

      Aset moneter                                                                                                                                     Monetary assets
      Kas dan setara kas                7,648,609,091           850,243                 1,593             1,004,811                506,659     Cash and cash equivalents
      Piutang usaha                     3,212,895,777                 -                     -                     -                212,240             Trade receivables
      Pajak dibayar dimuka              1,374,670,417                 -                     -                     -                 90,809                  Prepaid taxes
      Deposito berjangka yang                                                                                                                             Restricted time
         dibatasi penggunaannya           124,868,586                     -                    -                      -              8,249                      deposits
      Investasi lain-lain                 887,580,522                     -                    -                      -             58,633            Other investments
      Pinjaman untuk pihak ketiga       3,056,988,269                     -                    -                      -            201,941          Loans to third parties
      Pinjaman untuk pihak berelasi        48,396,809                     -                    -                      -              3,197        Loans to related parties
                                                                                                                                                     Service concession
      Piutang jasa konsesi                504,723,993                     -                    -                      -             33,342                  receivables
      Aset tidak lancar lain-lain           4,743,860                     -                    -                      -                313      Other non-current assets

      Total                            16,863,477,324           850,243                 1,593             1,004,811               1,115,383                             Total

      Liabilitas moneter                                                                                                                               Monetary liabilities
      Utang usaha                       (5,424,719,236)                   -            (12,504)             (151,183)              (358,469)              Trade payables
      Beban yang masih harus
         dibayar                        (2,393,877,633)                   -                    -            (407,079)              (158,417)             Accrued expenses
      Utang pajak                         (192,682,920)                   -                    -                   -                (12,728)                 Taxes payable
      Liabilitas imbalan kerja                                                                                                                       Short-term employee
         jangka pendek                     (20,424,336)                   -                    -                      -              (1,349)             benefits liabilities
      Utang lain-lain                      (22,417,488)                   -                    -                      -              (1,481)                 Other liabilities
      Liabilitas imbalan                                                                                                                                  Post-employment
         pasca kerja                    (1,165,797,114)                -                       -                      -             (77,011)             benefits liabilities
      Utang bank                        (2,304,126,757)       (8,691,100)                      -                      -            (158,995)                     Bank loans
      Liabilitas sewa                     (553,005,543)                -                       -                      -             (36,531)                Lease liabilities
                                                                                                                                                                Provision for
      Provisi pembongkaran,                                                                                                                      decommissioning, mine
         rehabilitasi, reklamasi dan                                                                                                           rehabilitation, reclamation
         penutupan tambang              (2,936,999,287)                   -                    -                      -            (194,015)                   and closure

      Total                            (15,014,050,314)       (8,691,100)              (12,504)             (558,262)              (998,996)                            Total

      Aset moneter neto                 1,849,427,010         (7,840,857)              (10,911)             446,549                116,387            Net monetary assets

      Dalam ekuivalen AS$                     122,171             (6,124)                  (13)                  353               116,387                 US$ equivalent
Page 139
                                              PT ADARO ENERGY INDONESIA Tbk
                                         DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                           Lampiran 5/127 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                  unless otherwise stated)

36.   ASET DAN LIABILITAS MONETER NETO DALAM                                   36.            NET MONETARY ASSETS AND LIABILITIES
      MATA UANG ASING (lanjutan)                                                              DENOMINATED IN FOREIGN CURRENCIES
                                                                                              (continued)

      Pada tanggal 30 September 2024 dan 31 Desenmber                                         As at 30 September 2024 and 31 December 2023,
      2023, Grup memiliki aset dan liabilitas moneter dengan                                  the Group had monetary assets and liabilities
      mata uang selain Dolar AS sebagai berikut: (lanjutan)                                   denominated in currencies other than US Dollars as
                                                                                              follows: (continued)
                                                                      31 Desember/December 2023
                                                                                                                           Jumlah setara
                                                                                                                         ribuan Dolar AS/
                                                                S$                 Euro                    A$               Equivalent
                                        Dalam/in          (nilai penuh/       (nilai penuh/          (nilai penuh/         in thousands
                                         Rp’000           full amount)        full amount)           full amount)          of US Dollars

      Aset moneter                                                                                                                                    Monetary assets
      Kas dan setara kas                9,797,195,092         1,219,992                1,593               586,478                636,847     Cash and cash equivalents
      Piutang usaha                     3,131,072,820                 -                    -                     -                203,105             Trade receivables
      Pajak dibayar dimuka              1,559,998,778                 -                    -                     -                101,193                 Prepaid taxes
      Pajak yang bisa dipulihkan
         kembali                          604,249,278                     -                   -                      -             39,196             Recoverable taxes
      Deposito berjangka yang                                                                                                                            Restricted time
         dibatasi penggunaannya           106,675,958                     -                   -                      -              6,920                      deposits
      Investasi lain-lain                 794,139,676                     -                   -                      -             51,514             Other investments
      Pinjaman untuk pihak ketiga       3,008,714,617                     -                   -                      -            195,168          Loans to third parties
      Pinjaman untuk pihak berelasi        46,900,000                     -                   -                      -              3,043        Loans to related parties
                                                                                                                                                     Service concession
      Piutang jasa konsesi                399,833,513                     -                   -                      -             25,936                  receivables
      Aset tidak lancar lain-lain           5,494,589                     -                   -                      -                356       Other non-current assets

      Total                            19,454,274,321         1,219,992                1,593               586,478               1,263,278                             Total

      Liabilitas moneter                                                                                                                              Monetary liabilities
      Utang usaha                       (5,104,921,351)                   -           (9,367)                (8,033)              (331,160)              Trade payables
      Beban yang masih harus
         dibayar                        (1,948,136,165)        (138,581)             (30,000)              (329,648)              (126,712)             Accrued expenses
      Utang pajak                         (156,315,442)               -                    -                      -                (10,140)                 Taxes payable
      Liabilitas imbalan kerja                                                                                                                      Short-term employee
         jangka pendek                     (20,263,083)                   -                   -                      -              (1,314)             benefits liabilities
      Utang lain-lain                      (26,026,801)                   -                   -                      -              (1,688)                 Other liabilities
      Liabilitas imbalan                                                                                                                                 Post-employment
         pasca kerja                    (1,139,828,697)                -                      -                      -             (73,938)             benefits liabilities
      Utang bank                          (228,342,151)       (9,497,500)                     -                      -             (22,015)                     Bank loans
      Liabilitas sewa                     (243,556,287)                -                      -                      -             (15,799)                Lease liabilities
                                                                                                                                                               Provision for
      Provisi pembongkaran,                                                                                                                     decommissioning, mine
         rehabilitasi, reklamasi dan                                                                                                          rehabilitation, reclamation
         penutupan tambang              (2,688,429,458)                   -                   -                      -            (174,392)                   and closure

      Total                            (11,555,819,435)       (9,636,081)            (39,367)              (337,681)              (757,158)                            Total

      Aset moneter neto                 7,898,454,886         (8,416,089)            (37,774)              248,797                506,120            Net monetary assets

      Dalam ekuivalen AS$                     512,352             (6,361)                (41)                   170               506,120                 US$ equivalent


      Aset dan liabilitas moneter di atas dijabarkan                                          The monetary assets and liabilities mentioned above
      menggunakan kurs penutupan Bank Indonesia tanggal                                       are translated using the Bank Indonesia closing rate
      30 September 2024 dan 31 Desember 2023.                                                 as at 30 September 2024 and 31 December 2023.

      Apabila aset dan liabilitas dalam mata uang selain                                      If assets and liabilities in currencies other than
      Dolar AS pada tanggal 30 September 2024 dijabarkan                                      US Dollars as at 30 September 2024 are translated
      dengan menggunakan kurs yang berlaku pada tanggal                                       using the exchange rate as at the date of completion
      penyelesaian laporan keuangan konsolidasian interim                                     of these interim consolidated financial statements,
      ini, jumlah aset moneter neto akan turun sekitar                                        the total net monetary assets will decrease by
      AS$4.675.                                                                               approximately US$4,675.
Page 140
                                                    PT ADARO ENERGY INDONESIA Tbk
                                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                               Lampiran 5/128 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                        30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                     (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                              unless otherwise stated)

37.    INFORMASI ARUS KAS                                                         37.        CASH FLOW INFORMATION

       a. Transaksi non-kas                                                                  a.     Non-cash transactions

           Tabel dibawah ini menunjukkan transaksi non-kas                                          The table below shows the Group’s non-cash
           Grup selama periode berjalan sebagai berikut:                                            transactions during the period as follows:

                                                                     30 September
                                                              2024                         2023

            Aktivitas yang tidak
              mempengaruhi arus kas:                                                                                                    Non-cash activities:
            Penambahan aset tetap
              melalui beban yang masih                                                                                          Additions of fixed assets
              harus dibayar                                       108,744                         17,695                              through accruals
            Perolehan aset tetap                                                                                               Acquisition of fixed assets
              melalui liabilitas sewa                              35,754                         53,327                                  under leases
            Penambahan aset tetap
              dan properti pertambangan                                                                                       Additions of fixed assets
              dari kapitalisasi biaya                                                                                and mining properties through
              pinjaman                                             16,418                          1,102           capitalisation of borrowing costs
            Penambahan kas dan
              deposito berjangka yang
              dibatasi penggunaannya                                                                            Additions of restricted cash and time
              melalui bunga roll-over                                  1,272                        362        deposits through roll-over of interest
            Penambahan aset tetap                                                                                            Additions of fixed assets
              melalui kapitalisasi                                                                                         through capitalisation of
              beban penyusutan                                         1,356                               -                  depreciation expense
            (Pengurangan)/penambahan
              aset tetap dan properti                                                                          (Deductions)/additions of fixed assets
               pertambangan melalui                                                                                 and mining properties through
              provisi, pembongkaran                                                                                provision for decommissioning,
              rehabilitasi, reklamasi                                                                             mine rehabilitation, reclamation
               dan penutupan tambang                                        (5)                     323                                and closure
            Pendapatan bunga yang
              diakumulasikan                                                                                              Interest income accumulated to
              ke pokok pinjaman                                             62                        46                                  loan principal

      b.   Rekonsiliasi liabilitas                yang        timbul     dari                b.     Reconciliation of liabilities arising from
           aktivitas pendanaan                                                                      financing activities

           Tabel dibawah ini menunjukkan rekonsiliasi                                               The tables below set out a reconciliation of
           liabilitas yang timbul dari aktivitas pendanaan                                          liabilities arising from financing activities for the
           untuk periode sembilan bulan yang berakhir pada                                          nine-month periods ended 30 September 2024
           tanggal 30 September 2024 dan 2023 sebagai                                               and 2023 as follows:
           berikut:
                                                                        Perubahan non-kas/Non-cash changes
                                                                            Pergerakan
                                                                            kurs mata                  Dampak pada
                                                                            uang asing/                 modifikasi
                                                                Akresi        Foreign                     utang/             Saldo
                                 Saldo awal/                    bunga/       exchange       Sewa        Impact on            akhir/
                                 Beginning      Arus kas/      Interest         rate        baru/          loan             Ending
                                  balance      Cash flows     accretion     movement      New leases   modification         balance
           30 September 2024                                                                                                                    30 September 2024
           Liabilitas sewa          111,911        (24,990)             -          1,234          35,754             -        123,909               Lease liabilities
           Utang bank               627,143        (38,964)         6,825          9,151               -        (1,719)       602,436                   Bank loans
           Senior Notes             697,189              -          2,563              -               -             -        699,752                 Senior Notes
           Pinjaman dari pihak
               ketiga                  3,013        10,659              -           295                -             -         13,967        Loans from third parties

           Total                   1,439,256       (53,295)         9,388         10,680          35,754        (1,719)     1,440,064                          Total
Page 141
                                                  PT ADARO ENERGY INDONESIA Tbk
                                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 5/129 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                          FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                      30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                   (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                            unless otherwise stated)

37.   INFORMASI ARUS KAS (lanjutan)                                                 37. CASH FLOW INFORMATION (continued)

      b.   Rekonsiliasi liabilitas yang                   timbul        dari              b.      Reconciliation of liabilities arising from
           aktivitas pendanaan (lanjutan)                                                         financing activities (continued)

           Tabel dibawah ini menunjukkan rekonsiliasi                                             The tables below set out a reconciliation of
           liabilitas yang timbul dari aktivitas pendanaan                                        liabilities arising from financing activities for the
           untuk periode sembilan bulan yang berakhir pada                                        nine-month periods ended 30 September 2024
           tanggal 30 September 2024 dan 2023 sebagai                                             and 2023 as follows: (continued)
           berikut: (lanjutan)
                                                                        Perubahan non-kas/Non-cash changes
                                                                                    Pergerakan
                                                                                     kurs mata
                                                                                    uang asing/
                                                                         Akresi       Foreign                     Saldo
                                        Saldo awal/                      bunga/      exchange        Sewa         akhir/
                                        Beginning      Arus kas/        Interest        rate         baru/       Ending
                                         balance      Cash flows       accretion    movement      New leases     balance

           30 September 2023                                                                                                              30 September 2023
           Liabilitas sewa                   67,650       (28,106)              -           13          53,327      92,884                     Lease liabilities
           Utang bank                       810,849        55,617           5,171         (595)              -     871,042                         Bank loans
           Senior Notes                     700,890        (7,030)          2,496            -               -     696,356                       Senior Notes
           Pinjaman dari pihak ketiga         3,256        (3,256)              -            -               -           -             Loans from third parties

           Total                          1,582,645       17,225            7,667         (582)         53,327    1,660,282                               Total



38.   PENGHASILAN DAN BIAYA KEUANGAN                                                38.   FINANCE INCOME AND COSTS

      a.   Penghasilan keuangan                                                           a.      Finance income
                                                                     30 September
                                                            2024                       2023
           Penghasilan bunga
             dari bank                                             100,631                  77,410                         Interest income from banks
           Penghasilan bunga dari
             pinjaman yang diberikan                                 20,925                 20,044                            Interest income from loans
           Lain-lain                                                    512                    184                                                Others
           Total                                                   122,068                  97,638                                                       Total

      b.   Biaya keuangan                                                                 b.      Finance costs
                                                                     30 September
                                                            2024                       2023
            Bunga dari utang bank                                                                                                Interest on bank loans
             dan Senior Notes                                        50,584                 69,266                                  and Senior Notes
            Bunga dari sewa                                           6,205                  3,880                                    Interest on leases
            Amortisasi biaya keuangan                                                                                           Amortisation of deferred
             yang ditangguhkan                                        9,515                    5,414                                   financing costs
            Lain-lain                                                 5,043                    2,869                                              Others
            Total                                                    71,347                    81,429                                                    Total

39.   SEGMEN OPERASI                                                                39.   OPERATING SEGMENTS

      Manajemen telah menentukan segmen operasi                                           Management has determined the operating
      berdasarkan laporan yang ditelaah oleh Direksi, yang                                segments based on reports reviewed by the Board
      telah diidentifikasikan sebagai pengambil keputusan                                 of Directors, which has been identified as the
      operasional utama Grup, dalam mengambil keputusan                                   Group’s chief operating decision maker, which
      strategis.                                                                          makes strategic decisions.

      Direksi mempertimbangkan operasi bisnis dari                                        The Board of Directors considers the business
      perspektif jenis bisnis yang terdiri dari pertambangan                              operation from a business type perspective, which
      dan perdagangan batubara, jasa pertambangan,                                        comprises coal mining and trading, mining services,
      logistik dan lain-lain (pembangkit listrik, manajemen                               logistics and others (power plant, asset
      aset dan sebagainya).                                                               management, etc.).
Page 142
                                                PT ADARO ENERGY INDONESIA Tbk
                                           DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 5/130 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                            FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                        30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                     (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                              unless otherwise stated)

39.   SEGMEN OPERASI (lanjutan)                                                      39.    OPERATING SEGMENTS (continued)

       Informasi segmen yang diberikan kepada Direksi untuk                                 The segment information provided to the Board of
       pelaporan segmen adalah sebagai berikut:                                             Directors for the reportable segments is as follows:
                                                                        30 September 2024
                                   Pertambangan
                                        dan
                                   perdagangan           Jasa
                                     batubara/      pertambangan/
                                    Coal mining         Mining       Logistik/         Lain-lain/        Eliminasi/        Konsolidasi/
                                    and trading        services      Logistics          Others          Eliminations       Consolidated

       Pendapatan di luar segmen       4,397,195               6         36,331              18,145                 -         4,451,677               External revenue
       Pendapatan antar segmen             2,539         742,175        388,570              77,765        (1,211,049)                -         Inter-segment revenue

       Pendapatan usaha                4,399,734         742,181        424,901              95,910        (1,211,049)        4,451,677                       Revenue

       Beban pokok pendapatan         (3,085,847)        (543,465)      (194,914)            (34,214)      1,163,451          (2,694,989)             Cost of revenue

       Beban penjualan dan                                                                                                                       Selling and marketing
         pemasaran                       (47,726)               -                -                  -                  -        (47,726)                   expenses

       Beban umum dan                                                                                                                                      General and
         administrasi                   (125,239)         (27,479)       (23,235)            (65,949)         34,560           (207,342)    administrative expenses

       Biaya keuangan                    (51,577)         (27,226)           (65)            (50,302)         57,823            (71,347)                Finance costs

       Penghasilan keuangan             103,274             4,220          5,153             65,379          (55,958)           122,068               Finance income

       Beban pajak penghasilan         (255,449)          (34,907)        (5,730)            (18,393)         13,870           (300,609)          Income tax expense

       Laba periode berjalan            932,219          300,079        204,475              28,749         (139,835)         1,325,687            Profit for the period

       Penyusutan dan                                                                                                                                Depreciation and
         amortisasi                      (60,222)        (132,157)       (27,024)            (12,797)        (22,099)          (254,299)               amortisation

       30 September 2024                                                                                                                          30 September 2024

       Aset segmen                     4,335,223        1,065,970       636,093            4,957,582         (85,681)        10,909,187               Segment assets

       Liabilitas segmen              2,124,231          508,035          76,465           1,421,875       (1,375,732)        2,754,874             Segment liabilities



                                                                        30 September 2023
                                   Pertambangan
                                        dan
                                   perdagangan           Jasa
                                     batubara/      pertambangan/
                                    Coal mining         Mining       Logistik/         Lain-lain/        Eliminasi/        Konsolidasi/
                                    and trading        services      Logistics          Others          Eliminations       Consolidated

       Pendapatan di luar segmen       4,837,034          98,752         35,125              10,185                 -         4,981,096               External revenue
       Pendapatan antar segmen             2,203         688,013        352,560              89,994        (1,132,770)                -         Inter-segment revenue

       Pendapatan usaha                4,839,237         786,765        387,685             100,179        (1,132,770)        4,981,096                       Revenue

       Beban pokok pendapatan         (3,230,627)        (636,358)      (180,793)            (29,262)      1,083,715          (2,993,325)             Cost of revenue

       Beban penjualan dan                                                                                                                       Selling and marketing
         pemasaran                       (82,142)               -                -                  -                  -        (82,142)                   expenses

       Beban umum dan                                                                                                                                      General and
         administrasi                   (175,025)         (28,823)       (21,613)            (63,694)         38,893           (250,262)    administrative expenses

       Biaya keuangan                    (77,000)         (25,373)          (137)            (64,455)         85,536            (81,429)                Finance costs

       Penghasilan keuangan             105,831             3,208          4,291             65,961          (81,653)            97,638               Finance income

       Beban pajak penghasilan          (297,248)         (22,157)        (4,848)            (14,670)          6,591           (332,332)          Income tax expense

       Laba periode berjalan           1,086,248          73,093        185,159              37,235            (3,901)        1,377,834            Profit for the period

       Penyusutan dan                                                                                                                                Depreciation and
         amortisasi                      (54,956)        (123,189)       (25,669)            (11,913)        (12,812)          (228,539)               amortisation

       30 September 2023                                                                                                                          30 September 2023

       Aset segmen                     5,247,952        1,020,206       609,184            3,838,840        (321,720)        10,394,462               Segment assets

       Liabilitas segmen              2,543,334          697,777          69,688           1,307,473       (1,634,414)        2,983,858             Segment liabilities


      Mayoritas aset tidak lancar Grup berada di Indonesia.                                 The majority of the Group’s non-current assets are
                                                                                            located in Indonesia.
Page 143
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/131 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

39.   SEGMEN OPERASI (lanjutan)                                 39.    OPERATING SEGMENTS (continued)

      Penjualan    berdasarkan    tujuan    adalah    sebagai          Sales by destination were as follows:
      berikut:

                                                      30 September
                                               2024                  2023

      Domestik                                       968,460           882,375                                     Domestic
      Ekspor                                                                                                           Export
      - Malaysia                                     747,778           804,045                                   Malaysia -
      - Cina                                         625,538           973,404                                       China -
      - Korea                                        508,156           453,193                                       Korea -
      - Jepang                                       496,080           483,004                                      Japan -
      - India                                        430,645           567,095                                        India -
      - Filipina                                     190,621           394,097                                 Philippines -
      - Hong kong                                    169,874           170,005                                 Hong Kong -
      - Taiwan                                       117,476           142,476                                     Taiwan -
      - Lain-lain                                    197,049           111,402                                      Others -

      Total                                      4,451,677            4,981,096                                         Total

      Penjualan antar segmen dilakukan berdasarkan pada                Sales between segments are carried out at
      harga di dalam kontrak. Pendapatan dari pihak                    contracted prices. The revenue from external parties
      eksternal yang dilaporkan kepada Direksi diukur                  reported to the Board of Directors is measured in a
      dengan cara yang sama sebagaimana disampaikan                    manner consistent with that presented in profit or
      pada laba rugi.                                                  loss.

      Jumlah yang dilaporkan kepada Direksi sehubungan                 The amounts provided to the Board of Directors with
      dengan jumlah aset dan liabilitas diukur dengan cara             respect to total assets and liabilities are measured in
      yang konsisten dengan yang dilaporkan dalam                      a manner consistent with the reporting in the
      laporan posisi keuangan konsolidasian.                           consolidated statements of financial position.


40.   PERJANJIAN          PENTING,         IKATAN,      DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI                                                     AND CONTINGENCIES

      a.      Perjanjian penambangan, pengangkutan,                    a.   Coal mining, hauling, barging, transhipment
              pemindahan batubara, dan perjanjian                           and other related agreements
              terkait lainnya

              AI, sebagai produsen batubara, mengadakan                     AI, as a coal producer, has entered into a
              sejumlah perjanjian penambangan batubara.                     number of coal mining agreements. Under the
              Berdasarkan perjanjian-perjanjian tersebut, AI                agreements, AI is required to pay contractors a
              diharuskan membayar biaya sewa dan biaya                      rental fee and a service fee, calculated on a
              jasa kepada kontraktor, dihitung secara                       monthly basis, based on a formula that includes
              bulanan, berdasarkan rumus yang meliputi                      the amount of raw coal transported and
              jumlah batubara mentah yang diangkut dan                      overburden mined and transported. The
              overburden yang ditambang dan diangkut.                       contractors will provide the equipment,
              Kontraktor akan menyediakan sarana, mesin,                    machinery, appliances and other supplies
              perlengkapan, dan barang-barang lain yang                     necessary and also in some instances may use
              diperlukan dan dalam kondisi tertentu dapat                   AI’s own equipment for performing the mining
              menggunakan peralatan AI sendiri untuk                        and transportation services and are required to
              melakukan      jasa   penambangan        dan                  meet      certain     minimum       production
              transportasi, dan diharuskan memenuhi                         requirements.
              persyaratan minimum produksi tertentu.
Page 144
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/132 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

40.   PERJANJIAN     PENTING,         IKATAN,       DAN      40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      a.   Perjanjian penambangan, pengangkutan,                   a.   Coal mining, hauling, barging, transhipment
           pemindahan batubara, dan perjanjian                          and other related agreements (continued)
           terkait lainnya (lanjutan)

           AI      juga      mengadakan         perjanjian              AI has also entered into coal barging, transport
           pengangkutan, transportasi, dan pemindahan                   and transhipment agreements with contractors
           batubara      dengan      kontraktor     untuk               to provide coal transportation services from AI’s
           menyediakan jasa transportasi dari wilayah                   main areas to certain port destinations and to
           utama AI ke pelabuhan tujuan yang telah                      provide floating crane services from the
           ditentukan dan menyediakan jasa floating                     contractors’ barge to customers’ vessels. AI is
           crane dari tongkang kontraktor ke kapal                      required to pay contractors a service fee,
           pelanggan. AI diharuskan membayar biaya                      calculated on a monthly basis, based on a
           jasa kepada kontraktor, dihitung secara                      formula that takes into account the amount of
           bulanan, berdasarkan suatu rumus yang                        coal transported.
           meliputi jumlah batubara yang diangkut.

           Pada tanggal 11 September 2015, AI                           On 11 September 2015, AI entered into a fuel
           mengadakan perjanjian penyediaan bahan                       supply agreement with PT Pertamina (Persero)
           bakar minyak dengan PT Pertamina (Persero)                   (“Pertamina”), whereby AI is required to pay
           (“Pertamina”),    dimana      AI    diharuskan               Pertamina a price, based on a formula that
           membayar kepada Pertamina berdasarkan                        consists of the volume of fuel supplied and the
           suatu rumus yang meliputi jumlah bahan bakar                 market price of fuel, and AI is required to
           minyak yang disediakan dan harga pasar atas                  purchase a minimum annual volume of fuel.
           bahan bakar minyak dan AI juga diharuskan                    This agreement was effective from 1 November
           membeli jumlah minimum tertentu volume                       2015. Since 16 September 2021, according to
           bahan bakar minyak setiap tahun. Perjanjian                  the novation agreement of fuel supply
           ini    berlaku     efektif    pada      tanggal              agreement that has been made and signed by
           1    November       2015.     Sejak     tanggal              and between AI, Pertamina, and PT Pertamina
           16 September 2021, berdasarkan perjanjian                    Patra Niaga, all of the responsibilities, rights
           novasi atas fuel supply agreement yang telah                 and obligations of Pertamina under the fuel
           dibuat dan ditandatangani oleh dan antara AI,                supply agreement were transferred to
           Pertamina, dan PT Pertamina Patra Niaga,                     PT Pertamina Patra Niaga. This novation
           seluruh tanggung jawab, hak dan kewajiban                    agreement was amended last by amendment III
           Pertamina berdasarkan perjanjian penyediaan                  of the fuel supply agreement to extend the term
           bahan bakar minyak dialihkan kepada PT                       until 31 January 2023 (“FSA”).
           Pertamina Patra Niaga. Perjanjian novasi ini
           diubah terakhir berdasarkan amandemen III
           atas    fuel    supply     agreement      untuk
           memperpanjang jangka waktu perjanjian
           sampai dengan 31 Januari 2023 (“FSA”).

           Pada tanggal 31 Januari 2023, AI                             On 31 January 2023, AI entered into a new fuel
           mengadakan perjanjian pemasokan bahan                        supply agreement with PT Pertamina Patra
           bakar minyak baru dengan PT Pertamina                        Niaga which continues the agreement between
           Patra Niaga melanjutkan perjanjian antara AI                 AI and PT Pertamina Patra Niaga previously
           dengan PT Pertamina Patra Niaga yang                         stated in the FSA. This fuel supply agreement
           sebelumnya tertuang dalam FSA. Perjanjian                    effective until 30 September 2029. On 28 March
           penyediaan bahan bakar ini berlaku sampai                    2024, this agreement was amended to change
           dengan 30 September 2029. Pada tanggal 28                    several provisions, which effective since 1 April
           Maret 2024, perjanjian ini telah diamendemen                 2024.
           untuk mengubah beberapa ketentuan, dengan
           keberlakuan efektif sejak tanggal 1 April 2024.
Page 145
                                                     PT ADARO ENERGY INDONESIA Tbk
                                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                 Lampiran 5/133 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                          unless otherwise stated)

40.   PERJANJIAN     PENTING,                              IKATAN,       DAN     40.    SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                                            AND CONTINGENCIES (continued)

      a.   Perjanjian penambangan, pengangkutan,                                         a.     Coal mining, hauling, barging, transhipment
           pemindahan batubara, dan perjanjian                                                  and other related agreements (continued)
           terkait lainnya (lanjutan)

           Berikut ini  adalah     pihak-pihak                           yang                    The following are counterparties of the Group’s
           mengadakan perjanjian dengan Grup:                                                    commitments:

               Kontraktor/                                 Tipe perjanjian/             Tanggal perjanjian/                        Akhir periode perjanjian/
                Contractor                                Agreement type                 Agreement date                              Contract period end
            PT Bukit Makmur                              Jasa pertambangan/                  29 Juni/                            31 Desember/December 2025
              Mandiri Utama                                Mining services                  June 2021                          bergantung pada persyaratan dan
                                                                                                                                        ketentuan dalam
                                                                                                                                perjanjian/Subject to terms and
                                                                                                                                conditions under the agreement

            PT Mitrabahtera                           Pengangkutan batubara/                   1 Oktober/                               30 September 2024*)
              Segara Sejati                                Coal barging                       October 2010
              Tbk

            PT Pertamina                              Penyediaan bahan bakar/          31 Januari/January 2023                           30 September 2029
              Patra Niaga                                   Fuel supply

            PT Samudera                      Kesepakatan untuk mengakses koridor          6 November 2015                             Pada akhir PKP2B MC/
              Rejeki Perkasa                jalan/Agreement to access road corridor                                                    End of MC’s CCoW

            PT Fortuna Cipta                 Kesepakatan untuk mengakses koridor       24 Desember/December                      Pada akhir PKP2B LC dan MC/
              Sejahtera                     jalan/Agreement to access road corridor            2014                               End of LC’s and MC’s CCoW

            PT Pada Idi                       Perjanjian penggunaan Intermediate         30 Juni/June 2021                                30 Juni/June 2026
                                             Stockpile Teluk Timbau/Agreement for
                                             Usage of Intermediate Stockpile Teluk
                                                            Timbau

            PT Putra Perkasa                             Jasa pertambangan/                   16 April 2024                              30 September 2027
              Abadi                                        Mining services

           *) Perjanjian ini sedang dalam proses perpanjangan                                    *) This agreement is in the process of extension


      b.   Perjanjian Kerjasama Penggunaan Tanah                                        b.       Land-Use Cooperation Agreement

           Pada tanggal 4 November 2009, MSW                                                     On 4 November 2009, MSW and the
           dan    Pemerintah       Kabupaten   Tabalong                                          Government of Tabalong Regency entered
           mengadakan           perjanjian    kerjasama                                          into a land-use cooperation agreement, for the
           penggunaan        tanah     milik Pemerintah                                          use of 100.2 hectares of the Government of
           Kabupaten Tabalong, seluas 100,2 hektar                                               Tabalong Regency’s land, located in Mabu’un
           yang terletak di desa Mabu’un, Kabupaten                                              village, Tabalong Regency, South Kalimantan.
           Tabalong, Kalimantan Selatan. Dengan                                                  Under this land-use cooperation agreement,
           adanya perjanjian kerjasama penggunaan                                                MSW has registered and obtained a land right
           tanah, MSW telah mendaftarkan dan                                                     over the Certificate of Management Rights
           mendapatkan sertifikat Hak Guna Bangunan                                              held by the Government of Tabalong Regency.
           diatas sertifikat Hak Pengelolaan atas nama
           Pemerintah Kabupaten Tabalong.

           Pada tanggal 27 Februari 2014, MSW dan                                                On 27 February 2014, MSW and the
           Pemerintah Kabupaten Tabalong melakukan                                               Government of Tabalong Regency amended
           perubahan atas jangka waktu perjanjian                                                the term of the land-use cooperation
           kerjasama penggunaan tanah menjadi 50                                                 agreement to 50 years, revised the land area
           tahun, merevisi luas tanah berdasarkan                                                based on needs, and provided fixed
           kebutuhan, dan memberikan kontribusi tetap                                            contribution and profit sharing to the
           dan pembagian hasil keuntungan kepada                                                 Government of Tabalong Regency.
           Pemerintah Kabupaten Tabalong.
Page 146
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/134 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

40.   PERJANJIAN     PENTING,        IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      c.   Fasilitas bank                                        c.    Banking facilities

           Pada tanggal 5 September 2007, AI                           On 5 September 2007, AI entered into a
           mengadakan perjanjian fasilitas perbankan                   banking facility agreement with HSBC to
           dengan HSBC untuk penerbitan garansi bank.                  issue bank guarantees. This agreement has
           Perjanjian ini telah mengalami beberapa kali                been amended several times with the latest
           perubahan dengan perubahan terakhir pada                    amendment dated 19 December 2016. The
           tanggal 19 Desember 2016. Fasilitas ini                     facility represents a combined limit facility
           merupakan gabungan limit fasilitas sebesar                  amounting to US$45,000 with a treasury
           AS$45.000 dengan fasilitas treasury sebesar                 facility amounting to US$5,000. This facility is
           AS$5.000. Fasilitas ini tidak diikat dengan                 not bound by any collateral. This agreement
           jaminan apapun. Perjanjian ini berlaku sampai               is valid until HSBC cancels, ceases or
                                                                       discharges AI in writing from its obligation
           HSBC membatalkan, menghentikan atau
                                                                       under the agreement, or any other related
           membebaskan AI secara tertulis dari
                                                                       agreement.
           kewajibannya berdasarkan perjanjian, atau
           perjanjian terkait lainnya.

           Pada tanggal 28 April 2014, AI mengadakan                   On 28 April 2014, AI entered into a banking
           perjanjian      fasilitas perbankan    dengan               facility agreement with Bank Mandiri. The
           Bank Mandiri. Fasilitas ini disediakan untuk                facility is provided to issue a treasury line with
           penerbitan treasury line dengan limit sebesar               a total limit amounting to US$75,000 and
           AS$75.000 dan fasilitas garansi bank dengan                 bank guarantees with a total limit amounting
           limit sebesar AS$50.000 dalam bentuk                        to US$50,000 in the form of bid and
           jaminan penawaran dan pelaksanaan.                          performance bonds. This facility can also be
           Fasilitas ini dapat digunakan oleh perusahaan               used by certain affiliated companies with
           afiliasi tertentu dengan syarat dan ketentuan               certain terms and conditions. This facility is
           tertentu. Fasilitas ini tidak diikat dengan                 not bound by any collateral. The agreement
           jaminan apapun. Perjanjian ini telah                        has been amended several times with the
           mengalami beberapa kali perubahan dengan                    latest amendment dated 22 May 2024 to
           perubahan terakhir pada tanggal 22 Mei 2024                 extend the treasury line facility until 27 April
           untuk memperpanjang fasilitas treasury line                 2025. The bank guarantee facility is only valid
           sampai dengan 27 April 2025. Fasilitas bank                 until 27 April 2023.
           garansi hanya berlaku sampai dengan 27 April
           2023.

           Pada tanggal 30 September 2024, total                       As at 30 September 2024, the total bank
           fasilitas perbankan yang sudah digunakan                    facilities used by AI amounted to US$1,200
           oleh AI sebesar AS$1.200 (31 Desember                       (31 December 2023: US$1,200). These
           2023: AS$1.200). Fasilitas tersebut digunakan               facilities were utilised in relation to sales
           sehubungan dengan kontrak penjualan dan                     contracts and reclamation guarantees.
           jaminan reklamasi.

           Pada     tanggal     19   Mei    2016,   AP                On 19 May 2016, AP signed a banking facility
           menandatangani surat fasilitas perbankan                   letter with DBS Bank Ltd, to issue a bank
           dengan DBS Bank Ltd, untuk menerbitkan                     guarantee in the form of financial or
           bank garansi dalam bentuk jaminan finansial                performance guarantees with a total limit of
           atau pelaksanaan dengan total limit sebesar                US$25,000. This facility is fully guaranteed by
           AS$25.000. Fasilitas ini dijamin sepenuhnya                the Company. As at 30 September 2024, the
           oleh Perusahaan. Pada tanggal 30 September                 total bank facility used which was obtained
           2024, total fasilitas perbankan yang sudah                 from DBS Bank Ltd amounted to US$1,518
           digunakan yang diperoleh dari DBS Bank Ltd                 (31 December 2023: US$nil). These facilities
           adalah sebesar AS$1.518 (31 Desember                       were utilised in relation to performance bond
           2023: AS$nihil). Fasilitas ini digunakan                   and contingent sponsor support guarantee.
           sehubungan dengan jaminan pelaksanaan
           dan garansi sponsor pendukung kontijensi.
Page 147
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/135 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

40.   PERJANJIAN     PENTING,          IKATAN,        DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)

      c.   Fasilitas bank (lanjutan)                                c.    Banking facilities (continued)

           Pada tanggal 14 Juli 2017, Perusahaan                          On 14 July 2017, the Company entered into a
           mengadakan perjanjian fasilitas perbankan                      banking facility agreement with BRI to issue
           dengan BRI untuk penerbitan garansi bank                       bank guarantees with a total limit amounting
           dengan total limit sebesar AS$183.500 dalam                    to US$183,500 in the form of bid bonds,
           bentuk     jaminan     penawaran,      jaminan                 performance bonds, reclamation guarantees,
           pelaksanaan, jaminan reklamasi, jaminan izin                   forestry lease-use permit guarantees,
           pinjam pakai kehutanan, Standby Letter of                      Standby Letters of Credit (“SBLC”), advance
           Credit (“SBLC”), jaminan uang muka dan                         payment bonds and maintenance bonds.
           jaminan pemeliharaan. Fasilitas ini dapat                      This facility can also be used by its
           digunakan oleh entitas anak. Fasilitas ini tidak               subsidiaries. This facility is not bound by any
           diikat dengan jaminan apapun. Pada tanggal                     collateral. On 14 October 2021, this
           14 Oktober 2021, perjanjian ini telah                          agreement was amended to extend the
           diamandemen untuk memperpanjang jangka                         maturity date of the agreement and change
           waktu perjanjian dan mengubah total limit                      the total limit of this facility to US$121,500. In
           fasilitas menjadi sebesar AS$121.500. Dalam                    this agreement, the facilities also provided a
           perjanjian ini, fasilitas yang disediakan                      foreign exchange line facility with a total limit
           termasuk fasilitas foreign exchange line                       amounting to US$75,000 and an import line
           dengan total limit sebesar AS$75.000 dan                       facility with a total limit amounting to
           import line dengan total limit sebesar                         US$5,800. This agreement has been
           AS$5.800. Perjanjian ini terakhir diubah pada                  amended, with the most recent amendment
           tanggal 19 Juli 2024 untuk mengubah total                      dated 19 July 2024 to change the total of
           fasilitas foreign exchange line menjadi                        foreign exchange line to US$100,000 and
           AS$100.000 dan memperpanjang jatuh tempo                       extend the maturity date to 14 July 2025. The
           sampai dengan 14 Juli 2025. Fasilitas import                   import line facility is only valid until 14 July
           line hanya berlaku sampai dengan 14 Juli                       2024.
           2024.

           Pada tanggal 9 Mei 2023, Perusahaan                            On 9 May 2023, the Company entered into a
           mengadakan perjanjian fasilitas perbankan                      banking facility agreement with Bank Mandiri
           dengan Bank Mandiri untuk penerbitan                           to issue bank guarantees with a total limit
           garansi bank dengan total limit sebesar                        amounting to US$150,000 in the form of bid
           AS$150.000      dalam        bentuk      jaminan               bonds, performance bonds, reclamation
           penawaran, jaminan pelaksanaan, jaminan                        guarantees, SBLC and advance payment
           reklamasi, SBLC, dan jaminan uang muka                         bonds with a maturity date of 27 April 2024.
           untuk jangka waktu sampai dengan 27 April                      This facility can also be used by its
           2024. Fasilitas ini dapat digunakan oleh                       subsidiaries. This facility is not bound by any
           entitas anak. Fasilitas ini tidak diikat dengan                collateral. On 28 May 2024, this agreement
           jaminan apapun. Pada tanggal 28 Mei 2024,                      was amended to extend the term of the facility
           perjanjian ini telah diamandemen untuk                         to 27 April 2025.
           memperpanjang jangka waktu fasilitas sampai
           dengan 27 April 2025.

           Pada tanggal 30 September 2024 dan                             As at 30 September 2024 and 31 December
           31 Desember 2023, total fasilitas perbankan                    2023, the total bank facility used by the Group
           yang sudah digunakan oleh Grup adalah                          amounted to US$83,450 and US$80,209,
           masing-masing sebesar AS$83.450 dan                            respectively. The facility was used in relation
           AS$80.209.   Fasilitas   yang     digunakan                    to reclamation guarantees, performance
           sehubungan dengan jaminan reklamasi,                           bonds, bid bonds, SBLC and counter
           jaminan pelaksanaan, jaminan penawaran,                        guarantees.
           SBLC dan counter guarantees.

           Pada tanggal 30 September 2024, AIS                            As at 30 September 2024, AIS has
           memiliki uncommitted trade facilities dengan                   uncommitted trade facilities for a total of
           total sebesar AS$370.000 dari berbagai bank                    US$370,000     from       various    banks
           (31 Desember 2023: AS$645.000). Pada                           (31 December 2023: US$645,000). As at
           tanggal 30 September 2024 dan 31 Desember                      30 September 2024 and 31 December 2023,
           2023, sisa saldo fasilitas perbankan yang                      the remaining balance of the bank facility
           tersedia adalah masing-masing sebesar                          amounted to US$370,000 and US$443,420,
           AS$370.000 dan AS$443.420.                                     respectively.
Page 148
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/136 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                     30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                  (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                           unless otherwise stated)

40.   PERJANJIAN     PENTING,           IKATAN,        DAN      40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                          AND CONTINGENCIES (continued)

      d.   Komitmen penjualan                                         d.       Sales commitments

           Pada tanggal 30 September 2024 dan                                  As at 30 September 2024 and 31 December
           31 Desember 2023, AI, MC, LC dan MIP                                2023, AI, MC, LC and MIP had various
           memiliki     beberapa      komitmen         untuk                   commitments to deliver coal to various
           mengirimkan batubara kepada beberapa                                customers approximately totalling 57 million
           pelanggan dengan total nilai berkisar 57 juta                       metric tonnes and 77 million metric tonnes
           metrik ton dan 77 juta metrik ton (tidak diaudit),                  (unaudited), subject to price agreements. The
           bergantung kepada kesepakatan harga.                                coal will be delivered periodically from 2024
           Batubara tersebut akan dikirimkan secara                            until 2032.
           periodik dari tahun 2024 sampai 2032.

      e.   Komitmen belanja modal                                     e.       Capital expenditure commitments

           Pada tanggal 30 September 2024 dan                                  As at 30 September 2024 and 31 December
           31 Desember 2023, Grup mempunyai                                    2023, the Group had purchase orders for
           pesanan pembelian untuk kapal, peralatan                            vessels, mining equipment, hauling roads and
           tambang, konstruksi jalan tambang dan                               infrastructure construction amounting to
           infrastruktur  masing-masing    sebesar                             US$942,284 and US$367,047, respectively.
           AS$942.284 dan AS$367.047.

      f.   Pungutan penggunaan kawasan hutan                          f.       Levy for use of forestry areas

           Berdasarkan Peraturan Pemerintah No. 33                            Based on Government Regulation No. 33 Year
           Tahun 2014 tentang Jenis dan Tarif atas Jenis                      2014 on the Type and Tariff of PNBP from the
           PNBP yang berasal dari Penggunaan                                  Use of Forestry Area for the Interest of
           Kawasan       Hutan     untuk    Kepentingan                       Development other than Forestry Activities
           Pembangunan di Luar Kegiatan Kehutanan                             Applicable to the Forestry Ministry, it is
           yang Berlaku pada Kementerian Kehutanan,                           stipulated that the use of forestry areas for the
           diatur bahwa penggunaan kawasan hutan                              interest of development other than forestry
           untuk kepentingan pembangunan diluar                               activities is subject to a PNBP levy for the
           kegiatan kehutanan dikenakan pungutan                              entire forest area that is leased and used and
           PNBP atas seluruh area kawasan hutan yang                          for the entire forest area for which lease and
           dipinjam-pakaikan dan seluruh area perjanjian                      use agreements are still effective, in
           pinjam pakai kawasan hutan yang masih                              accordance with the utilisation criteria, with a
           berlaku sesuai kriteria penggunaannya                              tariff ranging from Rp1,600,000/hectare to
           dengan tarif berkisar dari Rp1.600.000/hektar                      Rp4,000,000/hectare.        This    Government
           sampai       dengan       Rp4.000.000/hektar.                      Regulation was effective from August 2014
           Peraturan Pemerintah ini mulai berlaku                             and the Group has recognised this PNBP levy
           Agustus 2014 dan Grup telah mengakui                               on an accrual basis.
           pungutan PNBP ini secara akrual.

      g.   Perjanjian Fasilitas Bahan Bakar                           g.       Fuel Facilities Agreement

           Pada tanggal 31 Januari 2023, IBT                                   On 31 January 2023, IBT entered into a new
           menandatangani Perjanjian Fasilitas Bahan                           Fuel Facility Agreement with PT Pertamina
           Bakar baru dengan PT Pertamina Patra Niaga,                         Patra Niaga, whereby PT Pertamina Patra
           di mana PT Pertamina Patra Niaga setuju                             Niaga agreed to lease the fuel facilities and IBT
           untuk menyewa fasilitas bahan bakar tersebut                        will carry out the operation and maintenance of
           dan IBT akan melaksanakan pengoperasian                             the fuel facilities in the terminal, for the purpose
           dan pemeliharaan fasilitas bahan bakar di                           of supplying fuel to Adaro Group and third
           terminal tersebut, dengan tujuan untuk                              parties. For the use of the facilities, PT
           memasok bahan bakar ke Grup Adaro dan                               Pertamina Patra Niaga agreed to pay a lease
           pihak ketiga. Untuk penggunaan fasilitas ini,                       fee, operation and maintenance fee per barrel
           PT Pertamina Patra Niaga setuju untuk                               of fuel loaded and a port handling fee per
           membayar biaya sewa, biaya pengoperasian                            kilolitre based on the fuel discharged and
           dan pemeliharaan per barel bahan bakar yang                         loaded. The agreement is valid until 30
           dimuat dan biaya penanganan pelabuhan per                           September 2029.
           kiloliter berdasarkan bahan bakar yang
           dibongkar dan dimuat. Perjanjian ini berlaku
           sampai dengan tanggal 30 September 2029.
Page 149
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/137 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

40.   PERJANJIAN     PENTING,        IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      h.   Undang-Undang Pertambangan No. 3/2020                 h.        Mining Law No. 3/2020

           Pada tanggal 10 Juni 2020, telah diundangkan                   On 10 June 2020, Law No. 3 of 2020 on
           Undang-Undang No. 3 Tahun 2020 tentang                         Amendment to Law No. 4 of 2009 on Mineral
           Perubahan atas Undang-Undang No. 4 Tahun                       and Coal Mining (“Law No. 3/2020”) was
           2009 tentang Pertambangan Mineral dan                          promulgated.
           Batubara (“UU No. 3/2020”).

           UU No. 3/2020 mengatur beberapa hal,                           Law No. 3/2020 governs several provisions,
           diantaranya ketentuan terkait hak, kewajiban,                  including provisions related to rights,
           dan larangan dalam kegiatan usaha                              obligations, and prohibitions in mineral and
           pertambangan mineral dan batubara. UU No.                      coal mining business activities. Law No.
           3/2020 telah mengalami beberapa kali                           3/2020 has undergone several amendments
           perubahan dengan perubahan terakhir melalui                    with the latest amendment through
           Peraturan Pemerintah Pengganti Undang-                         Government Regulation in Lieu of Law No. 2
           Undang No. 2 Tahun 2022 tentang Cipta Kerja                    of 2022 regarding Job Creation (Perppu No.
           (Perppu No. 2/2022) sebagaimana telah                          2/2022) as stipulated into Law through Law
           ditetapkan menjadi Undang-Undang melalui                       No. 6 of 2023 regarding the stipulation of
           Undang-Undang No. 6 tahun 2023 tentang                         Perppu No. 2/2022 into Law ("Law No.
           penetapan Perppu No. 2/2022 menjadi                            6/2023") on 31 March 2023.
           Undang-Undang (“UU No. 6/2023”) pada
           tanggal 31 Maret 2023.

           Pada tanggal 9 September 2021, Pemerintah                      On 9 September 2021, the Government
           mengeluarkan Peraturan Pemerintah No. 96                       issued Government Regulation No. 96 of
           Tahun 2021 (“PP No.96/2021”) yang mengatur                     2021 (“PP No.96/2021”) concerning the
           mengenai Pelaksanaan Kegiatan Usaha                            Implementation of Mineral and Coal Business
           Pertambangan     Mineral    dan  Batubara.                     Activities. The Indonesian government has
           Pemerintah Indonesia telah mengubah PP No.                     amended PP No. 96/2021 by issuing
           96/2021 dengan menerbitkan Peraturan                           Government Regulation No. 25/2024.
           Pemerintah No. 25/2024 pada tanggal 30 Mei
           2024

           Grup     terus    memonitor     perkembangan                   The Group is closely monitoring the progress
           peraturan      pelaksana       Undang-Undang                   of the implementing regulations for the Law
           tersebut     secara      ketat    dan   akan                   and will consider the impact on the Group’s
           mempertimbangkan dampak terhadap operasi                       operations, if any, as these regulations are
           Grup, jika ada, pada saat peraturan-peraturan                  issued.
           pelaksana ini diterbitkan.

      i.   Peraturan Menteri Lingkungan Hidup dan                 i.       Ministerial Regulation of Environment and
           Kehutanan No. P.59/MENLHK/SETJEN/                               Forestry     No.   P.59/MENLHK/SETJEN/
           KUM.1/10/2019                                                   KUM.1/10/2019

           Pada bulan November 2019, Kementerian                           In November 2019, the Ministry of
           Lingkungan Hidup dan Kehutanan (“KLHK”)                         Environment and Forestry (“MoE&F”)
           mengeluarkan         Peraturan     Menteri                      issued        Ministerial        Regulation
           No. P.59/MENLHK/SETJEN/KUM.1/10/2019                            No. P.59/MENLHK/SETJEN/KUM.1/10/2019
           tentang     Penanaman       dalam  Rangka                       regarding the Planting for the Rehabilitation
           Rehabilitasi Daerah Aliran Sungai.                              of Watershed Areas.

           Peraturan ini merupakan pedoman bagi                            This regulation is a guideline for Borrow and
           pemegang Izin Pinjam Pakai Kawasan Hutan                        Use of Forest Area Permit (Izin Pinjam Pakai
           (“IPPKH”) yang memiliki kewajiban untuk                         Kawasan Hutan/”IPPKH”) holders, who are
           melakukan penanaman rehabilitasi Daerah                         obligated to perform rehabilitation of
           Aliran Sungai (“DAS”) pada lokasi yang                          watershed at a location stipulated in
           ditetapkan berdasarkan ketentuan yang diatur                    accordance with the provisions set forth in
           dalam peraturan ini, dan dengan tata cara                       this regulation, and with the procedure of
           pelaksanaan penanaman sesuai ketentuan                          rehabilitation according to the provisions set
           yang diatur dalam peraturan ini.                                forth in this regulation.
Page 150
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                           Lampiran 5/138 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

40.   PERJANJIAN      PENTING,       IKATAN,      DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                    AND CONTINGENCIES (continued)

      i.   Peraturan Menteri Lingkungan Hidup dan                i.       Ministerial Regulation of Environment and
           Kehutanan No. P.59/MENLHK/SETJEN/                              Forestry     No.   P.59/MENLHK/SETJEN/
           KUM.1/10/2019 (lanjutan)                                       KUM.1/10/2019 (continued)

           AI, MC dan LC, sebagai pemegang IPPKH                          AI, MC and LC, as the holders of an IPPKH
           (saat ini menjadi Persetujuan Penggunaan                       (currently known as Forest Area Usage
           Kawasan Hutan (“PPKH”)) sudah mulai                            Agreement       (Persetujuan  Penggunaan
           melaksanakan kewajiban atas penanaman                          Kawasan Hutan/”PPKH”)) have started to
           rehabilitasi DAS tersebut dan telah mengakui                   fulfil the obligation by planting the
           kewajiban ini secara akrual. Grup terus                        rehabilitation of the watershed and have
           memonitor      perkembangan      pelaksanaan                   recognised this obligation on an accrual
           peraturan ini.                                                 basis. The Group continues to monitor the
                                                                          progress of the implementation of this
                                                                          regulation.

      j.   Peraturan Menteri No. 48/2017                        j.        Ministerial Regulation No. 48/2017

           Pada tanggal 3 Agustus 2017, KESDM                             On 3 August 2017, the MoEMR issued
           mengeluarkan Peraturan Menteri No. 48/2017                     Ministerial Regulation No. 48/2017 regarding
           tentang Pengawasan Pengusahaan di Sektor                       the Control of Enterprises in the Energy and
           Energi dan Sumber Daya Mineral (“Permen                        Mineral Resources Sector (“Ministerial
           No. 48/2017”). Peraturan ini di antaranya                      Regulation No. 48/2017”). This regulation
           mengatur mengenai persyaratan pengalihan                       governs the transfer of shares and changes
           saham dan perubahan Direksi dan/atau                           in the Directors and/or Commissioners. Any
           Komisaris. Setiap pengalihan saham di AI,                      transfer of shares of AI, the AMC entities, PC,
           entitas-entitas AMC, PC, RC, PCS, SCM, LSA,                    RC, PCS, SCM, LSA, MIP and BEE is subject
           MIP dan BEE memerlukan persetujuan                             to the prior approval of the MoEMR.
           terlebih dahulu dari KESDM.

      k.   Peraturan Menteri No. 7/2020                         k.        Ministerial Regulation No. 7/2020

           Pada tanggal 3 Maret 2020, KESDM                               On 3 March 2020, the MoEMR issued
           mengeluarkan Peraturan Menteri No. 7/2020                      Ministerial Regulation No. 7/2020 regarding
           tentang Tata Cara Pemberian Wilayah,                           Procedures for the Granting of Areas,
           Perizinan dan Pelaporan Pada Kegiatan                          Licensing and Reporting on Mineral and Coal
           Usaha Pertambangan Mineral dan Batubara                        Mining Activities (“Permen No. 7/2020”).
           (“Permen No. 7/2020”). Permen No. 7/2020 ini                   Permen No. 7/2020 revokes, among others,
           antara lain mencabut Peraturan Menteri No.                     Ministerial Regulation No. 11/2018 on the
           11/2018 tentang Tata Cara Pemberian                            Procedures for the Granting of Areas,
           Wilayah, Perizinan, dan Pelaporan pada                         Licensing and Reporting on Mineral and Coal
           Kegiatan Usaha Pertambangan Mineral dan                        Mining Activities (“Permen No. 11/2018”),
           Batubara (“Permen No. 11/2018”), Peraturan                     Ministerial Regulation No. 22/2018 on the
           Menteri No. 22/2018 tentang Perubahan atas                     Amendment to Permen No. 11/2018,
           Permen No. 11/2018, Peraturan Menteri No.                      Ministerial Regulation No. 51/2018 on the
           51/2018 tentang Perubahan Kedua atas                           Second Amendment to Permen No. 11/2018
           Permen No. 11/2018 dan ketentuan mengenai                      and provisions regarding changes in the
           perubahan Direksi dan/atau Komisaris di                        Directors and/or Commissioners in the
           bidang pertambangan mineral dan batubara                       mineral and coal mining sector as stipulated
           sebagaimana      diatur   dalam     Permen                     in Ministerial Regulation No. 48/2017.
           No. 48/2017.

           Permen No. 7/2020 ini di antaranya mengatur                    Permen No. 7/2020 regulates the preparation
           tentang penyiapan dan penetapan Wilayah                        and determination of Mining Permit Areas
           Izin Usaha Pertambangan (“WIUP”) dan                           (“WIUP”) and Special Mining Permit Areas
           Wilayah Izin Usaha Pertambangan Khusus                         (“WIUPK”), Information System of Mining
           (“WIUPK”),    Sistem    Informasi   Wilayah                    Areas, procedures for granting WIUP and
           Pertambangan, tata cara pemberian WIUP                         WIUPK, licensing procedures, rights,
           dan WIUPK, tata cara pemberian perizinan,                      obligations and prohibitions and budget work
           hak, kewajiban, dan larangan dan rencana                       plans and reports.
           kerja anggaran biaya dan laporan.
Page 151
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/139 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

40.   PERJANJIAN     PENTING,        IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      k.   Peraturan Menteri No. 7/2020 (lanjutan)               k.        Ministerial    Regulation      No.    7/2020
                                                                           (continued)

           Berdasarkan persyaratan dan ketentuan atau                      Based on the terms and conditions or
           tata cara dalam Permen No. 7/2020 tersebut,                     procedures in Permen No. 7/2020, any
           setiap perubahan saham di AI, entitas-entitas                   changes in shares of AI, the AMC entities,
           AMC, PC, RC, PCS, SCM, LSA, MIP dan BEE                         PC, RC, PCS, SCM, LSA, MIP and BEE are
           wajib     terlebih  dahulu    mendapatkan                       subject to prior approval from the MoEMR or
           persetujuan KESDM atau gubernur sesuai                          the governor according to their authority and
           dengan       kewenangannya    dan      setiap                   any     changes      in    Directors   and/or
           perubahan Direksi dan/atau Komisaris di AI,                     Commissioners of AI, the AMC entities, PC,
           entitas-entitas AMC, PC, RC, PCS, SCM,                          RC, PCS, SCM, LSA, MIP and BEE must be
           LSA, MIP dan BEE wajib disampaikan kepada                       submitted to the MoEMR or governor
           KESDM          atau    gubernur       sesuai                    according to their authority. However, based
           kewenangannya.        Namun        demikian,                    on Law No. 3/2020, all authorities of local
           berdasarkan UU No. 3/2020, seluruh                              government in coal and mineral mining have
           kewenangan pemerintah daerah di bidang                          been transferred to the central government.
           pertambangan mineral dan batubara dialihkan                     Permen No. 7/2020 has been amended
           kepada pemerintah pusat. Permen No. 7/2020                      through Ministerial Regulation No. 16/2021
           ini telah diubah dengan Peraturan Menteri                       regarding the Amendment to Permen
           No. 16/2021 tentang Perubahan atas Permen                       No. 7/2020 issued on 29 June 2021.
           No. 7/2020 yang diterbitkan pada tanggal
           29 Juni 2021.

           Pada tanggal 19 April 2018, KESDM                               On 19 April 2018, the MoEMR issued
           menerbitkan        Keputusan         Menteri                    Ministerial Decree No. 1796K/30/MEM/2018
           No. 1796K/30/MEM/2018 mengenai Pedoman                          regarding the Guidelines for the Application,
           Pelaksanaan Permohonan, Evaluasi, serta                         Evaluation, and Issuance of Licences in the
           Penerbitan Perizinan di Bidang Pertambangan                     Mineral and Coal Mining Sector, which
           Mineral dan Batubara, yang di antara lain                       among others regulates the guidelines for the
           mengatur        pedoman         pelaksanaan                     implementation of application, evaluation and
           permohonan, evaluasi, dan penerbitan IUPK                       the issuance of an IUPK Operation
           Operasi Produksi perpanjangan dari Kontrak                      Production as an extension of an expired
           Karya atau PKP2B yang telah berakhir.                           Contract of Work or CCA/CCoW.

      l.   Peraturan Menteri No. 7/2017                          l.        Ministerial Regulation No. 7/2017

           Pada tanggal 11 Januari 2017, KESDM                             On 11 January 2017, the MoEMR issued
           mengeluarkan Peraturan Menteri No. 7/2017                       Ministerial Regulation No. 7/2017 regarding
           tentang Tata Cara Penetapan Harga Patokan                       the Procedures for the Setting of Benchmark
           Penjualan Mineral Logam dan Batubara,                           Prices for Metal Minerals and Coal Sales, as
           sebagaimana terakhir kali diubah melalui                        last amended through Ministerial Regulation
           Peraturan Menteri No. 11/2020. Sejak                            No. 11/2020. Since Ministerial Regulation
           Peraturan Menteri No. 7/2017 mulai berlaku,                     No. 7/2017 became applicable, the provisions
           ketentuan Peraturan Menteri No. 17/2010                         of Ministerial Regulation No. 17/2010 relating
           sepanjang mengatur mengenai harga patokan                       to benchmark prices for minerals and coal
           mineral dan batubara, dicabut dan dinyatakan                    sales are revoked and no longer valid.
           tidak berlaku.

           Pada tanggal 27 Februari 2023, KESDM                            On 27 February 2023, the MoEMR issued
           menerbitkan     Keputusan    Menteri    No.                     Ministerial Decree No. 41.K/MB.01/MEM.B/
           41.K/MB.01/MEM.B/2023 tentang Pedoman                           2023 regarding the Guidelines for the
           Penetapan Harga Patokan Untuk Penjualan                         Determination of Benchmark Prices for the
           Komoditas Batubara. Keputusan Menteri ini                       Sale of Coal Commodity. This Ministerial
           mengatur     formula-formula  baru    untuk                     Decree stipulates new formulas for the
           perhitungan Harga Batubara Acuan dan Harga                      calculation of the Coal Reference Price and
           Patokan Batubara yang berlaku sejak tanggal                     the Coal Benchmark Price which are effective
           27 Februari 2023.                                               from 27 February 2023.
Page 152
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/140 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

40.   PERJANJIAN     PENTING,        IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      l.   Peraturan Menteri No. 7/2017 (lanjutan)               l.      Ministerial     Regulation        No.      7/2017
                                                                        (continued)

           Pada tanggal 11 Agustus 2023, KESDM                          On 11 August 2023, the MoEMR issued
           menerbitkan Keputusan Menteri No. 227.K/                     Ministerial       Decree        No.227.K/MB.01/
           MB.01/MEM.B/2023        tentang     Pedoman                  MEM.B/2023 regarding the Guidelines for the
           Penetapan Harga Patokan Untuk Penjualan                      Determination of Benchmark Prices for the Sale
           Komoditas Batubara, yang sejak tanggal                       of Coal Commodity, which revoked Ministerial
           tersebut mencabut Keputusan Menteri                          Decree           No.        41.K/MB.01/MEM.B/
           No. 41.K/MB.01/MEM.B/2023. Keputusan                         2023 from that date. Ministerial Decree
           Menteri     No.    227.K/MB.01/MEM.B/2023                    No.227.K/MB.01       /MEM.B/2023         stipulates:
           mengatur terkait: (i) formula-formula baru                   (i) new formulas for the calculation of the Coal
           untuk perhitungan Harga Batubara Acuan dan                   Reference Price and the Coal Benchmark Price,
           Harga Patokan Batubara, serta (ii) penetapan                 and (ii) the determination of the reference
           spesifikasi acuan dan perhitungan Harga Jual                 specification and calculation of the Selling Price
           Batubara untuk Penyediaan Tenaga Listrik                     of Coal for the Supply of Electricity for the public
           untuk kepentingan umum dan Pemenuhan                         interest and to Fulfilment of the Raw
           Kebutuhan Bahan Baku/Bahan Bakar Industri                    Materials/Fuels Needs for Domestic Industry
           di dalam negeri selain Industri Pengolahan                   other than the Metal Mineral Processing and/or
           dan/atau Pemurnian Mineral Logam, yang                       Refining Industry, which are effective from 11
           berlaku sejak tanggal 11 Agustus 2023.                       August 2023.

      m.   Keputusan Menteri No. 267.K/MB.01/                    m.      Ministerial Decree No. 267.K/MB.01/MEM.B/
           MEM.B/2022 dan Keputusan Menteri                              2022       and      Ministerial    Decree
           No.399.K/MB.01/MEM.B/2023                                     No.399.K/MB.01/MEM.B/2023

           Pada tanggal 21 November 2022, KESDM                          On 21 November 2022, MoEMR issued
           mengeluarkan       Keputusan    Menteri                       Ministerial Decree No. 267.K/MB.01/MEM.B/
           No.    267.K/MB.01/MEM.B/2022   tentang                       2022 regarding Fulfilment of Domestic Coal
           Pemenuhan Kebutuhan Batubara Dalam                            Needs (“Ministerial Decree 267.K/MB.01/
           Negeri (“Keputusan Menteri 267.K/MB.01                        MEM.B/2022”), which revoked Ministerial
           /MEM.B/2022”), yang mencabut Keputusan                        Decree No. 139.K/HK.02/MEM.B/2021 and
           Menteri No. 139.K/HK.02/MEM.B/2021 dan                        Ministerial Decree No. 13.K/HK.021/MEM.B/
           Keputusan           Menteri         No.                       2022.
           13.K/HK.021/MEM.B/2022.

           Keputusan Menteri No. 267.K/MB.01/MEM.B/                      Ministerial Decree No. 267.K/MB.01/MEM.B/
           2022 antara lain mengatur terkait: (i)                        2022 stipulates among others: (i) the
           penetapan persentase penjualan batubara                       percentage of coal sales for domestic needs of
           untuk kebutuhan dalam negeri sebesar 25%                      25% (twenty five percent) of the planned annual
           (dua puluh lima persen) dari rencana jumlah                   coal production volume as stated in the initial
           produksi batubara tahunan sebagaimana                         approval of Annual Work Plan and Budget
           tercantum dalam persetujuan awal Rencana                      (Rencana Kerja dan Anggaran Biaya Tahunan
           Kerja dan Anggaran Biaya Tahunan (“RKAB”),                    or “RKAB”), or the amendment to the RKAB,
           atau perubahannya yang disetujui oleh                         approved by the Government, whichever is
           Pemerintah, yang mana yang lebih tinggi, (ii)
                                                                         higher, (ii) obligation to pay fines and/or
           kewajiban pembayaran denda dan dana
           kompensasi     atas     tidak    terpenuhinya                 compensation funds for non-fulfilment of
           kewajiban pemenuhan kebutuhan dalam                           domestic market obligation (DMO), (iii)
           negeri (DMO), (iii) sanksi administratif                      administrative sanctions including export ban,
           termasuk larangan ekspor batubara, (iv) harga                 (iv) coal sales price of US$70 per metric tonne
           jual batubara sebesar AS$70 per metrik ton                    FOB vessel for supplying coal for electricity
           kapal FOB untuk pasokan listrik untuk                         provided in the public interest, and (v)
           kepentingan publik, serta (v) penugasan untuk                 assignment to meet domestic coal needs in an
           pemenuhan kebutuhan batubara dalam negeri                     emergency condition.
           pada keadaan darurat.
Page 153
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/141 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

40.   PERJANJIAN      PENTING,         IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      m.   Keputusan Menteri No. 267.K/MB.01/                      m.      Ministerial Decree No. 267.K/MB.01/MEM.B/
           MEM.B/2022    dan  Keputusan      Menteri                       2022       and      Ministerial    Decree
           No.399.K/MB.01/MEM.B/2023 (lanjutan)                            No.399.K/MB.01/MEM.B/2023 (continued)

           Pada tanggal 17 November 2023, KESDM                            On 17 November 2023, MoEMR issued
           mengeluarkan      Keputusan    Menteri     No.                  Ministerial      Decree        No.399.K/MB.01/
           399.K/MB.01/MEM.B/2023 terkait Perubahan                        MEM.B/2023 regarding Amendments to the
           atas Keputusan Menteri Energi dan Sumber                        Decree of the Ministerial of Energy and Mineral
           Daya      Mineral    Nomor       267.K/MB.01/                   Resources          Number          267.K/MB.01
           MEM.B/2022 tentang Pemenuhan Kebutuhan                          /MEM.B/2022 concerning Domestic Market
           Batubara Dalam Negeri (“Keputusan Menteri                       Obligations ("Ministerial Decree No. 399
           No.399.K/MB.01/MEM.B/2023”), yang antara                        .K/MB.01/MEM.B/2023”), which among others
           lain mengatur: (i) penetapan persentase                         stipulates: (i) percentage of coal sales for
           penjualan batubara untuk kebutuhan dalam                        domestic market obligations (DMO) at 25%
           negeri (DMO) sebesar 25% (dua puluh lima                        (twenty five percent) of actual production in the
           persen) dari realisasi produksi pada tahun                      current year, (ii) eliminating the obligation to
           berjalan,   (ii)   penghapusan       kewajiban                  pay fines and only subject to the obligation to
           pembayaran denda dan hanya dikenakan                            pay compensation funds for non-fulfilment of
           kewajiban pembayaran dana kompensasi atas                       obligations to meet domestic market obligations
           tidak terpenuhinya kewajiban pemenuhan                          (DMO), (iii) changes to the calculation formula
           kebutuhan dalam negeri (DMO), (iii) perubahan                   of compensation funds and (iv) imposition of
           formula perhitungan dana kompensasi dan (iv)                    compensation fund obligations to meet
           pengenaan kewajiban dana kompensasi untuk                       domestic coal needs in 2022 are implemented
           pemenuhan kebutuhan batubara dalam negeri                       in accordance with the provisions of this
           tahun 2022 dilaksanakan sesuai dengan                           Ministerial Decree.
           ketentuan Keputusan Menteri ini.

           Grup akan senantiasa berupaya memenuhi                          The Group will continue to strive to meet its
           kewajibannya sebagaimana diatur dalam                           obligations as stipulated in the Ministerial
           Keputusan Menteri No. 267.K/MB.01/MEM.B/                        Decree No. 267.K/MB.01/MEM.B/2022 as
           2022 sebagaimana diubah dengan Keputusan                        amended     by    Ministerial  Decree    No.
           Menteri No. 399.K/MB.01/MEM.B/2023.                             399.K/MB.01/MEM.B/2023.

      n.   Keputusan Menteri No. 58.K/HK.02/MEM.B/                 n.      Ministerial Decree No. 58.K/HK.02/MEM.B/
           2022                                                            2022

           Pada tanggal 23 Maret 2022, KESDM                               On 23 March 2022, the MoEMR issued
           mengeluarkan    Keputusan      Menteri   No.                    Ministerial Decree No.58.K/HK.02/MEM.B/2022
           58.K/HK.02/MEM.B/2022 tentang Harga Jual                        regarding the Selling Price of Coal to Fulfil
           Batubara Untuk Pemenuhan Kebutuhan Bahan                        Domestic     Needs    for   Industrial Raw
           Baku/Bahan Bakar Industri di Dalam Negeri.                      Materials/Fuels.

           Keputusan Menteri ini antara lain mengatur                      This Ministerial Decree, among other things,
           harga jual batubara untuk pemenuhan bahan                       regulates the selling price of coal to meet the
           baku/bahan bakar industri di dalam negeri                       domestic needs for raw material/ industrial fuel
           sebesar AS$90 per metrik ton kapal FOB (untuk                   at US$90 per metric tonne FOB vessel (for coal
           batubara dengan spesifikasi sebagaimana                         with specifications as stipulated in the
           diatur dalam Keputusan Menteri). Penetapan                      Ministerial Decree). The selling price of coal to
           harga jual batubara untuk pemenuhan bahan                       meet the needs of domestic industrial raw
           baku/bahan bakar industri di dalam negeri tidak                 materials/fuels does not apply to the metal
           berlaku atas industri pengolahan dan/atau                       mineral processing and/or refining industry.
           pemurnian mineral logam.

           Keputusan Menteri ini mulai berlaku pada                        This Ministerial Decree came into effect on
           tanggal 1 April 2022 dan mencabut Keputusan                     1 April 2022 and revoked Ministerial Decree
           Menteri No. 206.K/HK.02/MEM.B/2021 tentang                      No. 206.K/HK.02/MEM.B/2021 concerning the
           Harga Jual Batubara untuk Pemenuhan                             Selling Price of Coal for Fulfilment of the Raw
           Kebutuhan Bahan Baku/Bahan Bakar Industri                       Material/Fuel for the Cement and Fertiliser
           Semen dan Pupuk di Dalam Negeri.                                Domestic Industry.
Page 154
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/142 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                          unless otherwise stated)

40.   PERJANJIAN      PENTING,          IKATAN,       DAN      40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                         AND CONTINGENCIES (continued)

      n.   Keputusan Menteri No. 58.K/HK.02/MEM.B/                   n.      Ministerial Decree No. 58.K/HK.02/MEM.B/
           2022 (lanjutan)                                                   2022 (continued)

           Manajemen berpendapat bahwa implementasi                           Management believes that the implementation
           Keputusan Menteri ini tidak berdampak                              of this Ministerial Decree will not have a
           signifikan terhadap penjualan dan kinerja                          significant impact on the Group's sales and
           keuangan Grup.                                                     financial performance.

      o.   Peraturan Pemerintah No. 15/2022                          o.      Government Regulation No. 15/2022

           Pada tanggal 11 April 2022, Pemerintah                             On 11 April 2022, the Government issued
           menerbitkan Peraturan Pemerintah No.                               Government Regulation No. 15/2022, on the
           15/2022 tentang perlakuan perpajakan                               Treatment of Taxation and/or PNBP in the coal
           dan/atau   PNBP       di  bidang  usaha                            mining sector, which regulates among others,
           pertambangan batubara, yang diantaranya                            the following:
           mengatur sebagai berikut:

           -   Tarif PNBP berupa penjualan hasil                              -       The PNBP rate for sales of mining
               tambang per ton dihitung berdasarkan                                   products per tonne is calculated based on
               formula yang diatur dalam peraturan ini                                the formula stipulated in this regulation at
               dengan tarif sebesar 14% sampai dengan                                 a rate of 14% to 28% (multiplied by the
               28% (dikalikan harga jual), tergantung                                 selling price), depending on the applicable
               dengan Harga Batubara Acuan (“HBA”)                                    Coal Reference Price (“HBA”), minus the
               yang berlaku, dikurangi tarif iuran                                    tariff for contribution of production/royalty
               produksi/royalti batubara dan dikurangi tarif                          for Coal and minus the tariff for utilisation
               pemanfaatan BMN eks PKP2B dari hasil                                   of BMN ex-PKP2B from production yield
               produksi per ton (0,21% dikalikan harga                                per tonne (0.21% multiplied by the selling
               jual).                                                                 price).
           -   PNBP bagian Pemerintah Pusat sebesar                               -   PNBP for the Central Government's share
               4% dan bagian Pemerintah Daerah sebesar                                of 4% and Local Government’s portion of
               6% dari keuntungan bersih pemegang                                     6% of the net profit of IUPK holders for the
               IUPK      sebagai   Kelanjutan  Operasi                                Continuation      of    Contract/Agreement
               Kontrak/Perjanjian,    sesuai   dengan                                 Operations, in accordance with the
               ketentuan peraturan perundang-undangan                                 provisions of laws and regulations in the
               di bidang pertambangan mineral dan                                     field of mineral and coal mining at the time
               batubara pada saat IUPK sebagai                                        the IUPK for the Continuation of
               Kelanjutan Operasi Kontrak/Perjanjian                                  Contract/Agreement Operations is issued.
               diterbitkan.
           -   PNBP di bidang lingkungan hidup dan                                -   PNBP in the environmental and forestry
               kehutanan sesuai dengan ketentuan                                      sector in accordance with the provisions of
               peraturan perundang-undangan di bidang                                 the laws and regulations in the applicable
               PNBP yang berlaku.                                                     PNBP sector.
           -   Tarif PPh Badan sebesar 22%.                                       -   CIT rate of 22%.
           -   Pajak bumi dan bangunan sesuai dengan                              -   Land and building tax in accordance with
               ketentuan peraturan perundang-undangan                                 the prevailing laws and regulations in the
               di bidang pajak bumi dan bangunan yang                                 field of land and building tax.
               berlaku.
           Berdasarkan IUPK sebagai Kelanjutan Operasi                            Based on the IUPK for the Continuation of
           Kontrak/Perjanjian AI (Catatan 1c), AI wajib                           Contract Operations/Agreement of AI (Note
           membayar       pendapatan      negara     dan                          1c), AI is required to pay state revenue and
           pendapatan daerah sesuai dengan jenis, tarif,                          regional revenue according to the type, tariff,
           serta tata cara pengenaan, pemungutan, dan                             and procedures for imposition, collection, and
           pembayaran/penyetoran         pada      tahun                          payment/deposit in the following year after the
           berikutnya setelah tahun IUPK sebagai                                  year of IUPK for the Continuation of
           Kelanjutan      Operasi    Kontrak/Perjanjian                          Contract/Agreement Operation issued in
           diterbitkan sesuai dengan ketentuan peraturan                          accordance with statutory provisions, in this
           perundang-undangan, dalam hal ini untuk AI                             case for AI, from 1 January 2023.
           adalah sejak 1 Januari 2023.
Page 155
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/143 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

40.   PERJANJIAN      PENTING,        IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

      o.   Peraturan Pemerintah No. 15/2022 (lanjutan)            o.      Government       Regulation      No.    15/2022
                                                                          (continued)

           AI telah mengimplementasikan ketentuan                          AI has implemented the provisions of this
           dalam peraturan ini sejak 1 Januari 2023.                       regulation since 1 January 2023.

      p.   Peraturan Pemerintah No. 26/2022                       p.       Government Regulation No. 26/2022

           Pada tanggal 15 Agustus 2022, Pemerintah                        On 15 August 2022, the Government issued
           menerbitkan Peraturan Pemerintah No.                            Government       Regulation     No.     26/2022,
           26/2022 tentang Jenis dan Tarif atas Jenis                      concerning Types and Tariffs for Types of
           PNBP yang berlaku pada KESDM, antara lain                       PNBP that apply to the MoEMR, which among
           mengatur penerimaan pemanfaatan sumber                          others regulates receipts from the use of
           daya alam mineral dan batubara, seperti: (i)                    natural mineral and coal resources, such as: (i)
           iuran tetap untuk IUP dan IUPK Operasi                          fixed contribution rate of IUP and IUPK Mineral
           Produksi Mineral Logam dan Batubara                             and Production Operations amounting to
           sebesar Rp60.000/hektar/tahun; dan IUP dan                      Rp60,000/hectare/year; and IUP and IUPK
           IUPK Eksplorasi Mineral Logam dan Batubara                      Mineral and Coal Exploration amounting to
           sebesar Rp30.000/hektar/tahun, (ii) iuran                       Rp30,000/hectare/year; (ii) contribution of
           produksi/royalti untuk batubara (Open pit)                      production/royalty for Coal (Open pit) ranging
           berdasarkan tingkat kalori dan level HBA                        based on calorie and HBA level at a percentage
           antara 5,0% sampai 13,5% dari harga per                         ranging from 5.0% to 13.5% of the price per
           metrik ton; (iii) iuran produksi/royalti untuk                  metric-tonne;       (iii)    contribution     of
           batubara (underground) berdasarkan tingkat                      production/royalty for coal (underground)
           kalori dan level HBA antara 4,0% sampai                         ranging based on calorie and HBA level at a
           12,5% dari harga per metrik ton.                                percentage ranging from 4.0% to 12.5% of the
                                                                           price per metric-tonne.

           Grup    terus   memonitor   perkembangan                        The Group is closely monitoring the progress of
           peraturan ini dan akan mempertimbangkan                         this regulation and will consider the impact on
           dampak terhadap operasi Grup, jika ada.                         the Group’s operations, if any.

      q.   Undang-Undang No. 6 Tahun 2023 (“UU No.                q.       Law No. 6 of 2023 (“Law No. 6/2023”)
           6/2023”)

           Pada tanggal 31 Maret 2023, telah diundangkan                   On 31 March 2023, Law No. 6 of 2023 which
           UU No. 6/2023 yang menetapkan Perppu No.                        stipulated Perppu No. 2/2022 became law.
           2/2022 menjadi Undang-Undang. Perppu No.                        Perppu No. 2/2022 was enacted on 30
           2/2022 telah ditetapkan pada tanggal 30                         December 2022 as a follow up to the
           Desember 2022 sebagai tindak lanjut Putusan                     Constitutional Court Decision No. 91/PUU-
           Mahkamah Konstitusi No. 91/PUU-XVIII/2020                       XVIII/2020 which mandates improvements to
           yang mengamanatkan perbaikan atas UU No.                        Law 11/2020, where amendments and
           11/2020, di mana perubahan dan penggantian                      replacements were made among others,
           yang dilakukan, diantaranya, mengenai                           regarding improvements to the investment
           peningkatan ekosistem investasi dan kegiatan                    ecosystem and business activities, employment,
           berusaha,     ketenagakerjaan,     kemudahan                    ease of doing business, encouragement to
           berusaha, dukungan riset dan inovasi,                           research and innovation, land acquisition, and
           pengadaan tanah, dan kawasan ekonomi.                           economic zones. With the enactment of Law No.
           Dengan      berlakunya  UU      No.    6/2023,                  6/2023, Law No. 11/2020 is revoked and no
           terkonfirmasi bahwa UU No. 11/2020 dicabut                      longer valid. Management believes that the
           dan dinyatakan tidak berlaku. Manajemen                         implementation of Law No. 6/2023 has no
           berpendapat bahwa implementasi UU No.                           significant impact on the Group’s financial
           6/2023 tidak memiliki dampak signifikan pada                    performance.
           kinerja keuangan Grup.
Page 156
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/144 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                              30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                           (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                    unless otherwise stated)

40.   PERJANJIAN     PENTING,           IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)

       r.   Peraturan Pemerintah No. 50 tahun 2022                  r.   Government Regulation No. 50 of 2022

            Pada tanggal 12 Desember 2022, Pemerintah                    On 12 December 2022, the Government
            telah menerbitkan Peraturan Pemerintah No. 50                issued Government Regulation No. 50 of 2022
            tahun 2022 (“PP No. 50/2022”) tentang Tata                   (“GR No. 50/2022”) concerning Procedures for
            Cara Pelaksanaan Hak dan Pemenuhan                           the Implementation of Rights and Fulfilment of
            Kewajiban Perpajakan.                                        Tax Obligations.

            PP No. 50/2022 mengatur tentang pembaruan                    GR No. 50/2022 stipulates renewal of
            pelaksanaan hak dan pemenuhan kewajiban                      implementation of rights and fulfilment of tax
            perpajakan yang bertujuan untuk memberikan                   obligations, which aims to provide more legal
            kepastian hukum, keadilan, kemudahan dan                     certainty, justice, ease and clarity to the public
            kejelasan    kepada      masyarakat    dalam                 in understanding the implementation of tax
            memahami ketentuan mengenai pelaksanaan                      rights and the fulfilment of obligations, such as
            hak dan pemenuhan kewajiban perpajakan,                      provisions for Tax Identity Number registration
            meliputi ketentuan pendaftaran Nomor Pokok                   and integration of population data with taxation
            Wajib Pajak dan integrasi data kependudukan                  data, implementation of tax rights and the
            dengan data perpajakan, pelaksanaan hak dan                  fulfilment of obligations electronically, as well as
            pemenuhan kewajiban perpajakan secara                        provisions regarding the implementation of
            elektronik,   serta    ketentuan    mengenai                 rights and the fulfilment of obligations in carbon
            pelaksanaan       hak     dan    pemenuhan                   tax.    Management         believes     that    the
            kewajiban     pajak    karbon.    Manajemen                  implementation of this regulation will not have a
            berpendapat bahwa implementasi peraturan ini                 significant impact on the Group’s financial
            tidak akan berdampak signifikan terhadap                     performance.
            kinerja keuangan Grup.

      s.    Peraturan Pemerintah No. 55 tahun 2022                  s.   Government Regulation No. 55 of 2022

            Pada tanggal 20 Desember 2022, Pemerintah                    On 20 December 2022, the Government
            telah menerbitkan Peraturan Pemerintah No. 55                issued Government Regulation No. 55 of 2022
            tahun 2022 (“PP No. 55/2022”) tentang                        (“GR No.      55/2022”) concerning the
            Penyesuaian     Pengaturan     dibidang Pajak                Adjustments to the Regulations in the field of
            Penghasilan.                                                 Income Taxes.

            PP No. 55/2022 mengatur antara lain                          GR No. 55/2022 regulates, among other
            administrasi perpajakan bagi Wajib Pajak                     things, tax administration for taxpayers with a
            dengan peredaran bruto tertentu dalam jangka                 certain gross income within a certain period of
            waktu tertentu, pengecualian dari objek Pajak                time, exemptions from income tax (“PPh”)
            Penghasilan (“PPh”), biaya yang dapat                        objects, costs that can be deducted from gross
            dikurangkan dari penghasilan bruto dan                       income and reduced PPh rates for public
            penurunan tarif PPh bagi Perusahaan Terbuka                  companies that meet certain requirements.
            yang     memenuhi     persyaratan     tertentu.              Management believes that the implementation
            Manajemen berpendapat bahwa implementasi                     of this regulation has no significant impact on
            peraturan ini tidak berdampak signifikan                     the Group’s financial performance.
            terhadap kinerja keuangan Grup.

      t.    Peraturan Menteri Lingkungan Hidup dan                  t.   Regulation of the Minister of Environment
            Kehutanan No. 21/2022                                        and Forestry No. 21/2022

            Pada    tanggal    21   September    2022,                   On 21 September 2022, the Ministry of
            Kementerian     Lingkungan    Hidup   dan                    Environment and Forestry issued Ministerial
            Kehutanan telah menerbitkan Peraturan                        Regulation No. 21/2022 ("Permen LHK
            Menteri No. 21/2022 ("Permen LHK 21/2022”)                   21/2022”) concerning the Implementation of
            tentang Tata Laksana Penerapan Nilai                         Carbon Economic Values (“NEK”).
            Ekonomi Karbon (“NEK”).
Page 157
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/145 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

40.   PERJANJIAN     PENTING,          IKATAN,      DAN      40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                       AND CONTINGENCIES (continued)

      t.   Peraturan Menteri Lingkungan Hidup dan                  t.   Regulation of the Minister of Environment
           Kehutanan No. 21/2022 (lanjutan)                             and Forestry No. 21/2022 (continued)

           Peraturan ini diantaranya mengatur mengenai                  This regulation regulates, among others,
           penyelenggaraan NEK melalui berbagai                         implementation of the NEK through various
           mekanisme,       salah     satunya   melalui                 mechanisms, one of which is through carbon
           perdagangan karbon, baik dalam negeri                        trading, both domestically and abroad;
           maupun luar negeri; pengukuran, pelaporan                    measurement, reporting and verification of
           dan verifikasi penyelenggaraan NEK; dan                      NEK implementation; and a certificate of
           sertifikat pengurangan emisi gas rumah kaca.                 reducing greenhouse gas emissions. This
           Peraturan ini juga mengatur ketentuan yang                   regulation also stipulates conditions that must
           harus dipenuhi oleh para pelaku usaha untuk                  be met by business actors to be able to carry
           dapat melakukan perdagangan karbon.                          out carbon trading.

           Grup memonitor perkembangan implementasi                     The Group is closely monitoring the
           peraturan tersebut secara ketat dan akan                     implementation of the regulations and will
           mempertimbangkan dampak terhadap operasi                     consider the impact on the Group’s
           Grup, jika ada.                                              operations, if any.

      u.   Perjanjian Pembelian Tenaga Listrik                     u.   Long-term Power Purchase Agreement
           (“PPTL”) Jangka Panjang untuk Proyek                         (“PPA”) for the Central Java Coal-Fired
           Pembangkit Listrik Bertenaga Uap Swasta                      Steam Power Plant Independent Power
           di Jawa Tengah                                               Producer (“IPP”) Project in Central Java

           Perusahaan, bersama-sama dengan Electric                     The Company, together with Electric Power
           Power Development Co Ltd (“Jpower”) dan                      Development Co Ltd (“Jpower”) and Itochu
           Itochu Corporation (“Itochu”), membentuk                     Corporation (“Itochu”), formed a consortium –
           Konsorsium “Jpower-Adaro-Itochu” untuk                       the “Jpower-Adaro-Itochu” Consortium – to
           melaksanakan        pengembangan      proyek                 undertake the development of coal-fired
           pembangkit listrik bertenaga uap berkapasitas                steam power plant 2x1,000 MW project in
           2x1.000 MW di Kabupaten Batang, Provinsi                     Batang Regency, the Province of Central
           Jawa Tengah. Pada bulan Juli 2011,                           Java. In July 2011, the Consortium
           Konsorsium mendirikan BPI, dimana Grup,                      established BPI, in which the Group, through
           melalui entitas anak perusahaannya, AP,                      its subsidiary, AP, Jpower and Itochu own
           Jpower dan Itochu mempunyai partisipasi                      participating interests of 34%, 34% and 32%,
           kepemilikan masing-masing sebesar 34%,                       respectively, to build, own, operate and
           34%, dan 32%, untuk membangun, memiliki,                     transfer a coal-fired steam power plant.
           mengoperasikan dan mengalihkan pembangkit
           listrik bertenaga uap.

           Pada tanggal 6 Oktober 2011, BPI dan                         On 6 October 2011, BPI and PLN signed a
           PLN menandatangani PPTL jangka panjang.                      long-term PPA. The PPA includes the
           PPTL ini mencakup pembangunan pembangkit                     construction of a coal-fired steam power plant
           listrik bertenaga uap berkapasitas 2x1.000 MW                with a total capacity of 2x1,000 MW in Batang
           di kabupaten Batang, Provinsi Jawa Tengah                    Regency, the Province of Central Java
           (CJPP) dan penyediaan listrik ke PLN selama                  (CJPP) and a 25-year supply of electricity to
           25 tahun. Proyek CJPP akan ditransfer ke PLN                 PLN. Upon expiration of the PPA term, the
           pada saat PPTL berakhir. Selain itu, Perjanjian              CJPP project will be transferred to PLN. In
           Penjaminan juga telah ditandatangani oleh dan                addition to the PPA, a Guarantee Agreement
           antara Pemerintah yang diwakili oleh Menteri                 was also signed by and between the
           Keuangan            Republik         Indonesia,              Government represented by the Minister of
           PT Penjaminan        Infrastruktur    Indonesia              Finance of the Republic of Indonesia, PT
           (Persero) (“PII”), dan BPI, pada tanggal 6                   Penjaminan Infrastruktur Indonesia (Persero)
           Oktober 2011 dan dalam hal ini, Pemerintah                   (“PII”) and BPI, on 6 October 2011, and in this
           dan PII memberikan jaminan pembayaran PLN                    case, the Government and PII guaranteed
           kepada BPI yang diatur dalam PPTL. Tanggal                   PLN’s payment obligations for BPI under the
           efektif Perjanjian Penjaminan dimulai pada                   PPA. The effective date of the Guarantee
           tanggal pembiayaan yaitu pada tanggal 6 Juni                 Agreement starts from the financing date
           2016 dan akan berlaku sampai dengan                          which is 6 June 2016 and shall be effective
           21 tahun setelah Tanggal Operasi Komersial                   until 21 years after the Project Commercial
           Proyek atas Proyek CJPP.                                     Operation Date (“PCOD”) of CJPP Project.
Page 158
                                    PT ADARO ENERGY INDONESIA Tbk
                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/146 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

40.   PERJANJIAN     PENTING,        IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      u.   Perjanjian Pembelian Tenaga Listrik                   u.    Long-term Power Purchase Agreement
           (“PPTL”) Jangka Panjang untuk Proyek                        (“PPA”) for the Central Java Coal-Fired
           Pembangkit Listrik Bertenaga Uap Swasta                     Steam Power Plant Independent Power
           di Jawa Tengah (lanjutan)                                   Producer (“IPP”) Project in Central Java
                                                                       (continued)

           Pada   tanggal    6    April  2016,     BPI                 On 6 April 2016, BPI signed Amendment No.
           menandatangani Amandemen No. 7 terhadap                     7 to the PPA which extends the required
           PPTL    yang     memperpanjang      tanggal                 financing date under the PPA to 6 June 2016.
           pembiayaan yang dipersyaratkan berdasarkan
           PPTL menjadi 6 Juni 2016.

           Pada tanggal 13 April 2016, BPI dan PLN                     On 13 April 2016, BPI and PLN signed
           kembali menandatangani Amandemen No. 8                      Amendment No. 8 to the PPA, which
           atas PPTL yang mengatur mengenai                            regulates PLN’s obligation to acquire the
           kewajiban PLN untuk mengakuisisi Tanah                      State Reserved Land for the development of
           Cadangan Umum Negara untuk pembangunan                      the CJPP project and BPI and PLN
           proyek CJPP dan kewajiban BPI dan PLN                       obligations to enter into a Land Lease
           untuk menandatangani Perjanjian Sewa Tanah                  Agreement with respect to the 125,146 m2
           sehubungan dengan plot-plot tanah sebesar                   plots of land acquired by PLN pursuant to Law
           125.146 m2 yang diakuisisi oleh PLN                         No. 2 of 2012 and Land Utilisation Agreement
           berdasarkan UU No. 2 Tahun 2012 dan                         with respect to the State Reserved Land.
           Perjanjian Penggunaan Tanah sehubungan
           dengan Tanah Cadangan Umum Negara.

           Pada tanggal 14 April 2016, BPI dan PLN                     On 14 April 2016, BPI and PLN signed the
           menandatangani Perjanjian Sewa Tanah                        Land Lease Agreement with respect to Law
           sehubungan dengan UU No. 2 Tahun 2012                       No. 2 of 2012 and the Land Utilisation
           dan     Perjanjian    Penggunaan       Tanah                Agreement with respect to the State
           sehubungan dengan Tanah Cadangan Umum                       Reserved Land. Through the signing of the
           Negara. Dengan ditandatanganinya Perjanjian                 Land Lease Agreement and the Land
           Sewa Tanah dan Perjanjian Penggunaan                        Utilisation Agreement, all required land for the
           Tanah tersebut, seluruh tanah yang diperlukan               development of the CJPP project has been
           untuk pembangunan proyek CJPP telah                         acquired.
           diperoleh.

           Pada tanggal 11 Mei 2016, BPI dan PLN                       On 11 May 2016, BPI and PLN signed
           menandatangani Amandemen No. 9 atas                         Amendment No. 9 to the PPA with respect to
           PPTL sehubungan dengan penerapan                            the implementation of Bank Indonesia
           Peraturan Bank Indonesia No. 17/3/PBI/2015                  Regulation No. 17/3/PBI/2015 regarding the
           tentang Kewajiban Penggunaan Rupiah di                      Mandatory Use of Rupiah within the Territory
           Wilayah Negara Kesatuan Republik Indonesia.                 of the Republic of Indonesia.

           Pada tanggal 6 Juni 2016, BPI telah mencapai                On 6 June 2016, BPI achieved the financing
           tanggal      pembiayaan         sebagaimana                 date as required by the PPA.
           dipersyaratkan oleh PPTL.

           Pada tanggal 30 Agustus 2021, BPI dan PLN                   On 30 August 2021, BPI and PLN signed the
           menandatangani       Amandemen          dan                 Amendment and Restatement Agreement
           Pernyataan Kembali Perjanjian sehubungan                    relating to the PPA, which among others
           dengan PPTL, yang antara lain menunda                       defers the required Commercial Operation
           Tanggal Operasi Komersial dan Tanggal                       Dates and Required Project Commercial
           Operasi Komersial Proyek yang Disyaratkan                   Operation Date to 2022. The CJPP first unit
           menjadi di tahun 2022. Unit pertama CJPP                    was commissioned and began commercial
           telah menyelesaikan komisioning dan mulai                   operations on 15 August 2022, while the
           beroperasi secara komersial sejak 15 Agustus                CJPP second unit was commissioned and
           2022, sedangkan unit kedua CJPP telah                       began commercial operations on 31 August
           menyelesaikan komisioning dan mulai                         2022.
           beroperasi secara komersial sejak 31 Agustus
           2022.
Page 159
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/147 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                            30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                         (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                  unless otherwise stated)

40.   PERJANJIAN     PENTING,         IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

      v.   PPTL untuk Proyek IPP Pembangkit Listrik               v.   PPA for the South Kalimantan Coal-Fired
           Bertenaga Uap di Kalimantan Selatan                         Steam Power Plant IPP Project

           Perusahaan, bersama-sama dengan Korea                       The Company, together with Korea East-West
           East-West Power Co, Ltd, membentuk                          Power Co, Ltd, formed a consortium with
           konsorsium dengan partisipasi kepemilikan                   participation interests of 65% and 35%,
           masing-masing sebesar 65% dan 35%. Pada                     respectively. On 12 August 2013, the
           tanggal 12 Agustus 2013, konsorsium                         consortium established TPI to build, own,
           mendirikan TPI untuk membangun, memiliki,                   operate and transfer a coal-fired steam power
           mengoperasikan,         dan       mengalihkan               plant.
           pembangkit listrik bertenaga uap.

           Pada tanggal 15 Oktober 2014, TPI dan PLN                   On 15 October 2014, TPI and PLN signed a
           menandatangani PPTL jangka panjang. PPTL                    long-term PPA. The PPA contemplates,
           ini mencakup antara lain, keahlian teknik,                  among others, the engineering, construction,
           pembangunan, kepemilikan dan operasi                        ownership, and operation of a coal-fired steam
           pembangkit listrik bertenaga uap berkapasitas               power plant with a total capacity of 2x100 MW
           2x100 MW di Provinsi Kalimantan Selatan                     in the Province of South Kalimantan (South
           (South Kalimantan Power Plant/“SKPP”) dan                   Kalimantan Power Plant/“SKPP”) and a 25-
           penyediaan listrik ke PLN selama 25 tahun.                  year supply of electricity to PLN. Upon the
           Proyek SKPP akan ditransfer ke PLN pada                     expiration of the PPA term, the SKPP project
           saat PPTL berakhir. Proyek ini termasuk                     will be transferred to PLN. This project is
           dalam Proyek Fast Track Program tahap 2                     included in the Fast Track Programme Project
           (FTP-2) dengan skema Build, Own, Operate                    phase 2 (FTP-2), with the Build, Own, Operate
           and    Transfer     (“BOOT”).    Proyek    ini              and Transfer (“BOOT”) scheme. This Project
           memperoleh fasilitas penjaminan Pemerintah                  obtained support from the Government,
           melalui Menteri Keuangan Republik Indonesia                 represented by the Minister of Finance of the
           dalam bentuk Surat Jaminan Kelayakan                        Republic of Indonesia (“MoF”) in the form of a
           Usaha (“SJKU”) yang diterbitkan tanggal                     Business Viability Guarantee Letter (“BVGL”)
           3 Januari 2017. Tanggal efektif SJKU dimulai                dated 3 January 2017. The BVGL effective
           pada tanggal pembiayaan dan akan berlaku                    date commences on the financing date and
           sampai dengan 17 tahun setelah Tanggal                      shall be effective until 17 years after the COD
           Operasi Komersial sesuai dengan PPA.                        pursuant to the PPA.

           Pada tanggal 18 November 2016, TPI dan                      On 18 November 2016, TPI and PLN signed
           PLN menandatangani Amandemen No. 1 atas                     Amendment No. 1 to the PPA concerning the
           PPTL yang mengatur perubahan tentang                        invoicing and payment procedures and the
           prosedur penagihan dan pembayaran dan                       form of PLN consent letter.
           format surat persetujuan PLN.

           Pada tanggal 24 Januari 2017, TPI mencapai                  On 24 January 2017, TPI achieved the
           tanggal      pembiayaan         sebagaimana                 financing date as required by the PPA. The
           dipersyaratkan oleh PPTL. Unit pertama SKPP                 SKPP first unit was commissioned and began
           telah menyelesaikan komisioning dan mulai                   commercial operations on 23 September 2019,
           beroperasi     secara     komersial     sejak               while the      SKPP     second   unit  was
           23 September 2019, sedangkan unit kedua                     commissioned      and began commercial
           SKPP telah selesai komisioning dan mulai                    operations on 14 December 2019.
           beroperasi     secara     komersial     sejak
           14 Desember 2019.

           Pada tanggal 30 Oktober 2023, TPI dan PLN                   On 30 October 2023, TPI and PLN signed the
           menandatangani amandemen No. 2 atas                         Amendment No. 2 to the PPA concerning the
           PPTL yang mengatur perubahan tentang                        implementation of VAT on coal for the
           implementasi PPN atas batubara untuk                        calculation of component C.
           perhitungan komponen C.
Page 160
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/148 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

40.   PERJANJIAN     PENTING,        IKATAN,      DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                    AND CONTINGENCIES (continued)
      w.   Proses hukum                                         w.      Legal proceedings

           Kasus arbitrase AIS                                          AIS’ arbitration case
           Pada tanggal 3 Juni 2024, AIS mengajukan                     On 3 June 2024, AIS filed a Request for
           Permohonan Arbitrase kepada International                    Arbitration with the International Chamber of
           Chamber of Commerce, untuk mengklaim                         Commerce,           claiming     approximately
           kurang lebih sebesar AS$106.000 terhadap                     US$106,000 against a counterparty in respect
           pihak     lawan     sehubungan    dengan                     of    its   breaches      under   a contract.
           wanprestasi berdasarkan suatu kontrak.                       Subsequently, the counterparty filed a
           Selanjutnya, pihak lawan mengajukan                          counterclaim,        claiming    approximately
           gugatan balik, mengklaim kurang lebih                        US$229,947 against AIS. The arbitration
           sebesar AS$229.947 terhadap AIS. Proses                      proceeding is still ongoing.
           arbitrase masih berlangsung.
           Kasus gugatan lahan                                          Land lawsuit case
           Pada tanggal 2 September 2024, AAI, LSA,                     On 2 September 2024, AAI, LSA, SIS, SCM
           SIS, SCM dan PT Cakradenta Agung Pertiwi                     and PT Cakradenta Agung Pertiwi (a third
           (pihak ketiga) menerima gugatan ganti rugi                   party) received a lawsuit for damages from
           dari Hariyadi sebagai penggugat terkait                      Hariyadi as the plaintiff, related to the control
           penguasaan dan pemanfaatan lahan dengan                      and utilisation of land, with a total claim
           total gugatan sebesar Rp3 triliun, beserta                   amounting to Rp3 trillion, along with a coercive
           uang paksa sebesar Rp5 juta per hari apabila                 fine of Rp5 million per day in the event of
           lalai atau terlambat melaksanakan putusan.                   failure or delay in executing the judgment. As
           Sampai       dengan    laporan   keuangan                    of the date the interim consolidated financial
           konsolidasian interim diterbitkan, proses                    statements were issued, the court proceedings
           persidangan atas gugatan ini masih                           for this lawsuit are still ongoing.
           berlangsung.

           Grup (beserta ventura bersamanya) dari                       From time to time, the Group (including its joint
           waktu ke waktu terlibat dalam berbagai                       ventures) is involved in various legal
           tuntutan hukum yang dapat mempengaruhi                       proceedings as a normal consequence of the
           kegiatan bisnis Grup. Grup berkeyakinan                      Group’s business. The Group is of the opinion
           bahwa       keputusan       yang       tidak                 that adverse decisions in any pending or
           menguntungkan       sehubungan      dengan                   threatened proceedings, or any amounts it
           tuntutan hukum yang sedang berjalan, atau                    may be required to pay by reason thereof, are
           keharusan untuk membayar sejumlah ganti                      unlikely to have a material adverse effect on its
           rugi dari tuntutan hukum tersebut,                           financial condition or the consolidated results
           kemungkinan       besar      tidak     akan                  of operations.
           mempengaruhi kondisi keuangan atau hasil
           operasi konsolidasian secara material.
      x.   Perjanjian Pinjaman dengan KIKI                      x.       Loan Agreement with KIKI

           Pada tanggal 30 Agustus 2021, ATBI                            On 30 August 2021, ATBI entered into a Loan
           mengadakan Perjanjian Pinjaman sebesar                        Agreement of Rp150,000,000,000 (full
           Rp150.000.000.000 (nilai penuh) dengan KIKI.                  amount) with KIKI. This loan facility will be
           Fasilitas pinjaman ini digunakan untuk                        used for land acquisition in the business of
           pembebasan tanah dalam usaha pendirian                        establishing an industrial area in North
           kawasan industri di Kalimantan Utara                          Kalimantan     (the      “Project”)    and   the
           (“Proyek”) dan pengembangan kegiatan usaha                    development of KIKI’s business operations.
           KIKI. Fasilitas pinjaman ini dikenakan suku                   This loan facility bears fixed interest at a
           bunga tetap sebesar persentase tertentu per                   certain percentage per annum and will be due
           tahun dan akan jatuh tempo dalam jangka                       within 2 years from the first loan drawdown
           waktu 2 tahun sejak tanggal dilakukannya                      date of the facility. Prior to or on the maturity
           pencairan pinjaman pertama. Sebelum atau                      date, part or all of the unpaid loan can be
           pada tanggal jatuh tempo, sebagian atau                       converted by ATBI into shares, with terms and
           seluruh pinjaman yang belum dibayar dapat                     conditions to be agreed upon in the future,
           dikonversi oleh ATBI menjadi saham, dengan                    unless otherwise determined by the parties.
           persyaratan dan ketentuan yang akan
           disepakati kemudian, kecuali ditentukan lain
           oleh para pihak.
Page 161
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/149 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

40.   PERJANJIAN     PENTING,           IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)

      x.   Perjanjian Pinjaman dengan KIKI (lanjutan)               x.   Loan Agreement with KIKI (continued)

           Konversi pinjaman hanya akan dilakukan atas                   Loan conversion will be carried out only on
           pinjaman yang belum dibayarkan oleh KIKI,                     loans that have not been repaid by KIKI, while
           sementara untuk bunga pinjaman harus                          interest on loans must be paid by KIKI. This
           dibayarkan oleh KIKI. Fasilitas ini tidak diikat              facility is not bound by any collateral.
           dengan jaminan apapun.

           Pada tanggal 30 Agustus 2023, KIKI telah                      On 30 August 2023, KIKI has fully repaid this
           melakukan pelunasan atas fasilitas pinjaman                   loan facility amounted to Rp120,000,000,000
           tersebut sebesar Rp120.000.000.000 (nilai                     (full amount) or equivalent to US$7,862, and
           penuh) atau setara AS$7.862, dan sejak                        since that date, this loan facility has been
           tanggal tersebut, fasilitas pinjaman ini sudah                ended.
           berakhir.

           Pada tanggal 2 Desember 2021, ATBI                            On 2 December 2021, ATBI entered into a
           menandatangani Perjanjian Pinjaman sebesar                    Loan Agreement of Rp948,000,000,000 (full
           Rp948.000.000.000 (nilai penuh) dengan                        amount) with KIKI. On 17 March 2022,
           KIKI. Pada tanggal 17 Maret 2022, dilakukan                   Amendment I was made to the agreement to
           Amandemen I atas perjanjian tersebut untuk                    change the total amount of the loan facility to
           mengubah jumlah fasilitas pinjaman menjadi                    Rp1,026,000,000,000 (full amount). On 28
           sebesar Rp1.026.000.000.000 (nilai penuh).                    July 2022, amendment II was made to change
           Pada tanggal 28 Juli 2022, dilakukan                          the total amount of the loan facility to
           amandemen II atas perjanjian tersebut untuk                   Rp1,164,000,000,000 (full amount). On
           mengubah jumlah fasilitas pinjaman menjadi                    8 December 2023, Amendment III was made
           sebesar Rp1.164.000.000.000 (nilai penuh).                    to extend the term of agreement to five years
           Pada tanggal 8 Desember 2023, dilakukan                       from the first drawdown date of the facility.
           amandemen III atas perjanjian tersebut untuk
           memperpanjang jangka waktu perjanjian
           menjadi lima tahun sejak tanggal dilakukannya
           pencairan pinjaman pertama.

           Fasilitas pinjaman ini dikenakan suku bunga                   This loan facility bears a fixed interest rate at a
           tetap sebesar persentase tertentu. Fasilitas                  certain percentage. The loan facility is
           pinjaman ini diikat dengan jaminan berupa                     guaranteed by the share pledge of KIKI. The
           gadai saham KIKI. Pinjaman akan digunakan                     loan will be used for the Project’s development
           untuk biaya pembangunan Proyek, pembelian                     cost, land purchase and/or land compensation
           tanah dan/atau kompensasi pembebasan                          and other costs related to the Project. The
           tanah dan biaya-biaya lain yang terkait dengan                drawdown of the loan is subject to the
           Proyek. Pencairan pinjaman bergantung pada                    fulfilment of certain conditions.
           pemenuhan kondisi-kondisi tertentu.

           Selama periode sembilan bulan yang berakhir                   During the nine-month period ended
           pada tanggal 30 September 2024, ATBI telah                    30 September 2024, ATBI has provided
           memberikan tambahan pencairan sebesar                         additional   disbursement         amounting    to
           Rp1.000.000.000 (nilai penuh) atau setara                     Rp1,000,000,000 (full amount) or equivalent to
           dengan AS$61 dan telah menerima                               US$61 and has received repayments
           pembayaran sebesar Rp107.000.000.000                          amounting to Rp107,000,000,000 (full
           (nilai penuh) atau setara dengan AS$7.025,                    amount) or equivalent to US$7,025, of loan to
           atas pinjaman ke KIKI atas fasilitas pinjaman                 KIKI under this loan facility (for the nine-month
           ini (untuk periode sembilan bulan yang                        period ended 30 September 2023: has
           berakhir pada tanggal 30 September 2023:                      provided additional disbursement amounting
           memberikan tambahan pencairan sebesar                         to Rp33.000.000.000 (full amount) or
           Rp33.000.000.000 (nilai penuh) atau setara                    equivalent to US$2,182) and has received
           dengan AS$2.182 dan menerima pembayaran                       repayments amounting to Rpnil).
           sebesar Rpnihil).
Page 162
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                             Lampiran 5/150 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

40.   PERJANJIAN     PENTING,         IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                      AND CONTINGENCIES (continued)

      x.   Perjanjian Pinjaman dengan KIKI (lanjutan)             x.   Loan Agreement with KIKI (continued)

           Pada tanggal 30 September 2024, saldo                       As at 30 September 2024, the outstanding
           pinjaman yang terutang atas fasilitas pinjaman              balance   of    this   loan   facility   was
           ini adalah sebesar Rp114.600.515.442 (nilai                 Rp114,600,515,442 (full amount) or equivalent
           penuh) atau setara dengan AS$7.570                          to   US$7,570      (31   December      2023:
           (31 Desember 2023: Rp227.360.000.000                        Rp227,360,000,000 (full amount) or equivalent
           (nilai penuh) atau setara dengan AS$14.748)                 to US$14,748) (Note 14).
           (Catatan 14).

      y.   Perjanjian Pinjaman dengan KIPI                        y.   Loan Agreement with KIPI

           Pada tanggal 2 Desember 2021, ATBI                          On 2 December 2021, ATBI entered into a
           menandatangani Perjanjian Pinjaman sebesar                  Loan Agreement of Rp2,513,725,000,000 (full
           Rp2.513.725.000.000 (nilai penuh) dengan                    amount) with KIPI. On 17 March 2022,
           KIPI. Pada tanggal 17 Maret 2022, dilakukan                 Amendment I was made to the agreement to
           Amandemen I atas perjanjian tersebut untuk                  change the total amount of the loan facility to
           mengubah jumlah fasilitas pinjaman menjadi                  Rp2,635,725,000,000 (full amount). On 28
           sebesar Rp2.635.725.000.000 (nilai penuh).                  July 2022, Amendment II was made to the
           Pada tanggal 28 Juli 2022, dilakukan                        agreement to change the total amount of the
           Amandemen II atas perjanjian tersebut untuk                 loan facility to Rp3,184,725,000,000 (full
           mengubah jumlah fasilitas pinjaman menjadi                  amount).
           sebesar Rp3.184.725.000.000 (nilai penuh).

           Pada tanggal 8 Desember 2023, dilakukan                     On 8 December 2023, Amendment III was
           Amandemen III atas perjanjian tersebut untuk                made to extend the term of agreement to five
           memperpanjang jangka waktu perjanjian                       years from the first drawdown date of the
           menjadi lima tahun sejak tanggal dilakukannya               facility.
           pencairan pinjaman pertama.

           Pinjaman akan digunakan antara lain untuk                   The loan will be used among others to fund the
           mendanai pembangunan, pengembangan dan                      construction, development and management
           pengelolaan kawasan industri di Kalimantan                  of an industrial area in North Kalimantan (the
           Utara (“Proyek”), pembelian tanah dan/atau                  “Project”), land purchase and/or land
           kompensasi pembebasan tanah dan biaya-                      compensation and other costs related to the
           biaya lain yang terkait dengan Proyek.                      Project. The drawdown of the loan is subject to
           Pencairan    pinjaman   bergantung   pada                   the fulfilment of certain conditions.
           pemenuhan kondisi-kondisi tertentu.

           Fasilitas pinjaman ini dikenakan suku bunga                 This loan facility bears a fixed interest rate at a
           tetap sebesar persentase tertentu per tahun.                certain percentage per annum. The loan facility
           Fasilitas pinjaman ini diikat dengan jaminan                is guaranteed by the share pledge of KIPI.
           berupa gadai saham KIPI.

           Selama periode sembilan bulan yang berakhir                 During the nine-month period ended
           pada tanggal 30 September 2024, ATBI telah                  30 September 2024, ATBI has provided
           memberikan tambahan pencairan atas                          additional disbursement of loan to KIPI under
           pinjaman ke KIPI atas fasilitas pinjaman ini                this      loan      facility amounting      to
           sebesar Rp142.000.000.000 (nilai penuh) atau                Rp142,000,000,000 (full amount) or equivalent
           setara dengan AS$9.201 (untuk periode                       to US$9,201 (for the nine-month period ended
           sembilan bulan yang berakhir pada tanggal                   30 September 2023: Rp145.000.000.000 (full
           30 September 2023: Rp145.000.000.000 (nilai                 amount) or equivalent to US$9,589). As at
           penuh) atau setara dengan AS$9.589). Pada                   30 September 2024, the outstanding balance
           tanggal 30 September 2024, saldo pinjaman                   of this loan facility was Rp2,326,905,869,894
           yang terutang atas fasilitas pinjaman ini                   (full amount) or equivalent to US$153,713
           adalah sebesar Rp2.326.905.869.894 (nilai                   (31 December 2023: Rp2,250,180,000,000
           penuh) atau setara dengan AS$153.713                        (full amount) or equivalent to US$145,964)
           (31 Desember 2023: Rp2.250.180.000.000                      (Note 14).
           (nilai penuh) atau setara dengan AS$145.964)
           (Catatan 14).
Page 163
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/151 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

40.   PERJANJIAN     PENTING,           IKATAN,      DAN      40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                        AND CONTINGENCIES (continued)

      z.    Perjanjian Fasilitas Pinjaman Berjangka                 z.    Rp325,000,000,000 Senior          Term     Loan
            Senior Rp325.000.000.000                                      Facility Agreement

            Pada tanggal 14 Juni 2023, DTP                                On 14 June 2023, DTP entered into a Senior
            menandatangani       Perjanjian       Fasilitas               Term         Loan     Facility      Agreement
            Pinjaman Berjangka Senior dengan sindikasi                    Rp325,000,000,000 (full amount) with a
            lembaga pembiayaan infrastruktur sebesar                      syndication     of  infrastructure    financing
            Rp325.000.000.000 (nilai penuh). ATM dan                      institutions. ATM and PT Adhi Karya (Persero)
            PT Adhi Karya (Persero) Tbk bertindak                         Tbk act as guarantors for this loan facility.
            sebagai penjamin atas fasilitas pinjaman ini.

            Fasilitas pinjaman ini digunakan untuk                        This loan facility is utilised to finance the
            membiayai proyek SPAM Kota Dumai                              Dumai City SPAM project with a capacity of
            kapasitas 450 liter per detik. Fasilitas                      450 litres per second. This loan facility bears
            pinjaman ini dikenakan suku bunga tetap                       a fixed interest rate of a certain percentage per
            sebesar persentase tertentu per tahun yang                    annum starting from the date of the agreement
            terhitung sejak tanggal perjanjian hingga                     until the seventh year. While the eighth year
            tahun ketujuh. Sedangkan untuk tahun                          onwards bears an interest rate of the Jakarta
            kedelapan sampai seterusnya dikenakan suku                    Interbank Offered Rate (“JIBOR”) plus a
            bunga sebesar Jakarta Interbank Offered Rate                  certain percentage per annum. This loan
            (“JIBOR”) ditambah persentase tertentu per                    facility will mature within a period of sixteen
            tahun. Fasilitas pinjaman ini akan jatuh tempo                years from the signing date of the Senior Term
            dalam jangka waktu enam belas tahun sejak                     Facility Loan Agreement and the instalment
            tanggal penandatanganan Perjanjian Fasilitas                  payment is payable every nine-months with
            Pinjaman Berjangka Senior dan pembayaran                      the first instalment in June 2025.
            angsuran akan dibayarkan setiap sembilan
            bulan dengan angsuran pertama pada bulan
            Juni 2025.

            Pinjaman ini dijamin dengan jaminan berupa                    The loan is secured with pledge of ATM’s
            gadai atas saham ATM di DTP, jaminan gadai                    shares in DTP, pledge of DTP’s bank
            atas rekening bank DTP, jaminan fidusia atas                  accounts, fiduciary security of the proceeds of
            hasil klaim asuransi, jaminan fidusia atas                    insurance claims, fiduciary security of the
            mesin dan perlengkapan, jaminan fidusia atas                  machineries and supplies, fiduciary security of
            piutang dan hak tanggungan atas tanah dan                     the receivables and mortgages for land and
            bangunan.       Fasilitas    pinjaman      ini                buildings. This loan facility also requires DTP
            mensyaratkan DTP untuk menjaga rasio                          to maintain certain financial ratios and comply
            keuangan tertentu dan memenuhi beberapa                       with several terms and conditions stated in the
            syarat dan ketentuan yang tercantum di dalam                  loan agreement.
            perjanjian pinjaman.

      aa.   Perjanjian Pembelian Tenaga Listrik -                   aa.   Power Purchase Agreement - Tanah Laut
            Pembangkit Listrik Tenaga Bayu di Tanah                       Wind Farm
            Laut

            Pada tanggal 4 Mei 2023, Total Eren S.A.                      On 4 May 2023, Total Eren S.A. with AP and
            bersama dengan AP dan PT Pembangkitan                         PT Pembangkitan Jawa Bali Investasi signed
            Jawa     Bali  Investasi  menandatangani                      a Power Purchase Agreement with PT PLN
            Perjanjian Pembelian Tenaga Listrik dengan                    (Persero) for the Tanah Laut Wind Farm.
            PT PLN (Persero) untuk PLTB Tanah Laut.
Page 164
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/152 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

40.   PERJANJIAN     PENTING,            IKATAN,       DAN      40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                          AND CONTINGENCIES (continued)

      ab.   Peraturan Pemerintah No. 36 Tahun 2023                    ab.    Government Regulation No. 36 of 2023
            (“PP No. 36/2023”)                                              (“GR No. 36/2023”)

            Pada tanggal 12 Juli 2023, Pemerintah                           On 12 July 2023, the Government issued GR
            menerbitkan PP No. 36/2023 tentang Devisa                       No. 36/2023 concerning Foreign Exchange
            Hasil   Ekspor   (“DHE”)    dari   Kegiatan                     Export Proceeds (“DHE”) from Natural
            Pengusahaan,      Pengelolaan,     dan/atau                     Resources (“SDA”) Business Management
            Pengolahan Sumber Daya Alam (“SDA”),                            and/or Processing Activities which revoked
            dimana mencabut Peraturan Pemerintah                            the Government Regulation No. 1 of 2019 on
            Nomor 1 Tahun 2019 tentang Devisa Hasil                         Foreign Exchange Export Proceeds from
            Ekspor    dari   Kegiatan     Pengusahaan,                      Natural Resources Business, Management
            Pengelolaan, dan/atau Pengolahan Sumber                         and/or Processing Activities, became effective
            Daya Alam, dan mulai berlaku pada tanggal 1                     on 1 August 2023.
            Agustus 2023.

            PP No. 36/2023 mengatur tentang kewajiban                       GR No. 36/2023 regulates the obligation to
            memasukkan devisa berupa DHE SDA ke                             place foreign exchange in the form of DHE
            dalam sistem keuangan Indonesia melalui                         SDA into the financial system in Indonesia
            penempatan ke dalam Rekening Khusus DHE                         through placement into a DHE SDA Special
            SDA pada Lembaga Pembiayaan Ekspor                              Account at Indonesian Export Financing
            Indonesia dan/atau Bank yang Melakukan                          Institutions  and/or     Banks    Conducting
            Kegiatan Usaha dalam Valuta Asing. DHE SDA                      Business Activities in Foreign Currency. DHE
            yang telah dimasukkan dan ditempatkan ke                        SDA that has been placed into a DHE SDA
            dalam Rekening Khusus DHE SDA wajib tetap                       Special Account must remain placed at least
            ditempatkan paling sedikit sebesar 30% dan                      30% for a minimum of 3 (three) months after
            paling singkat 3 (tiga) bulan sejak penempatan                  placement in the DHE SDA Special Account.
            dalam Rekening Khusus DHE SDA.

            AI, MIP, LC and MC telah melaksanakan                           AI, MIP, LC and MC have carried out the
            kewajibannya untuk menempatkan DHE SDA                          obligations to place DHE SDA into the DHE
            ke dalam Rekening Khusus DHE SDA                                SDA Special Account as required by the
            sebagaimana dipersyaratkan dalam peraturan                      applicable laws and regulations, and is
            perundang-undangan yang berlaku, dan                            presented as part of “Cash and Cash
            disajikan sebagai bagian dari “Kas dan Setara                   Equivalents” in the consolidated statements of
            Kas” dalam laporan posisi keuangan                              financial position.
            konsolidasian.

      ac. Perjanjian Pinjaman dengan PSM                              ac.   Loan Agreement with PSM

            Pada tanggal 6 Desember 2023, ATCI                              On 6 December 2023, ATCI entered into a
            menandatangani perjanjian pinjaman dengan                       loan agreement with PSM, where ATCI
            PSM, dimana ATCI memberikan fasilitas                           provided a loan facility amounting to
            pinjaman sebesar Rp376.687.500.000 (nilai                       Rp376,687,500,000        (full  amount)       or
            penuh) atau setara dengan AS$24.500 kepada                      equivalent to US$24,500 to PSM. PSM has
            PSM. PSM telah melakukan penarikan seluruh                      fully drawdown this loan facility on
            jumlah fasilitas pinjaman ini pada tanggal                      8 December 2023. This loan facility will be
            8 Desember 2023. Fasilitas pinjaman ini akan                    used for general corporate purposes. This
            digunakan untuk tujuan umum korporasi.                          loan facility bears fixed interest rate at a
            Fasilitas pinjaman ini dikenakan tingkat suku                   certain percentage per annum and will be due
            bunga tetap dengan persentase tertentu per                      within 6 (six) months from the date of the first
            tahun dan akan jatuh tempo dalam waktu                          loan drawdown, or such other date as
            6 (enam) bulan sejak tanggal penarikan                          determined by ATCI. Based on this
            pinjaman pertama, atau tanggal lainnya yang                     agreement, this loan is guaranteed by a
            ditentukan oleh ATCI. Berdasarkan perjanjian ini,               pledge over all PSM’s shares and may be
            pinjaman ini dijaminkan dengan gadai atas                       provided with further pledge of shares from
            seluruh saham PSM dan dapat diberikan                           other related parties.
            jaminan lebih lanjut atas saham dari pihak
            berelasi lainnya.
Page 165
                                     PT ADARO ENERGY INDONESIA Tbk
                                DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                            Lampiran 5/153 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                   unless otherwise stated)

40.   PERJANJIAN     PENTING,        IKATAN,       DAN     40.   SIGNIFICANT AGREEMENTS, COMMITMENTS
      KONTINJENSI (lanjutan)                                     AND CONTINGENCIES (continued)

      ac. Perjanjian Pinjaman dengan PSM (lanjutan)              ac.   Loan Agreement with PSM (continued)

          Pada tanggal 5 Maret 2024, ATCI                              On 5 March 2024, ATCI entered into an
          menandatangani Amandemen dan Pernyataan                      Amendment and Restatement of Loan
          Kembali Perjanjian Pinjaman tertanggal                       Agreement dated 6 December 2023 with PSM,
          6 Desember 2023 dengan PSM, dimana ATCI                      whereby ATCI provided an additional loan
          memberikan tambahan fasilitas pinjaman                       facility   to     PSM       amounting        to
          kepada PSM sebesar Rp150.000.000.000 (nilai                  Rp150,000,000,000 (full amount). PSM has
          penuh). PSM telah melakukan penarikan                        fully drawdown this additional loan facility on
                                                                       8 March 2024.
          seluruh tambahan fasilitas pinjaman ini pada
          tanggal 8 Maret 2024.

          Pada tanggal 17 September 2024, perjanjian                   On 17 September 2024, this loan agreement
          pinjaman ini telah kembali diamandemen untuk                 was amended to extend the loan maturity date
          memperpanjang tanggal jatuh tempo pinjaman                   to become 30 June 2025.
          menjadi tanggal 30 Juni 2025.

          Pada tanggal 30 September 2024, saldo                        As at 30 September 2024, the total outstanding
          pinjaman yang terutang dari fasilitas pinjaman               balance    of   this    loan    facility  was
          ini adalah sebesar Rp504.702.992.897 (nilai                  Rp504,702,992,897 (full amount) or equivalent
          penuh) atau setara dengan AS$33.340                          to    US$33,340    (31     December      2023:
          (31 Desember 2023: Rp376.687.500.000 (nilai                  Rp376,687,500,000 (full amount) or equivalent
          penuh) atau setara dengan AS$24.435)                         to US$24,435) (Note 14).
          (Catatan 14).


41.   JAMINAN REKLAMASI           DAN     PENUTUPAN        41.   RECLAMATION         GUARANTEES         AND     MINE
      TAMBANG                                                    CLOSURE

      Pada tanggal 20 Desember 2010, Pemerintah                  On 20 December 2010, the Government released an
      mengeluarkan    peraturan   implementasi    atas           implementing regulation for Mining Law No. 4/2009,
      Undang-Undang Mineral No. 4/2009, yaitu PP No.             i.e. GR No. 78 dealing with reclamation and post-
      78 yang mengatur aktivitas reklamasi dan                   mining activities for both IUP-Exploration and
      pascatambang untuk pemegang IUP-Eksplorasi dan             IUP-Production Operation holders. The transitional
      IUP-Operasi Produksi. Ketentuan peralihan dalam            provisions in GR No. 78 make it clear that
      PP No. 78 menegaskan bahwa para pemegang                   CCA/CCoW holders are also required to comply with
      PKP2B juga wajib mematuhi peraturan ini.                   this regulation.

      Pemegang IUP-Eksplorasi, ketentuannya antara               An     IUP-Exploration   holder,   among      other
      lain, harus memuat rencana reklamasi di dalam              requirements, must include a reclamation plan in its
      rencana kerja dan anggaran biaya eksplorasinya             exploration work plan and budget and provide a
      dan menyediakan jaminan reklamasi berupa                   reclamation guarantee in the form of a time deposit
      deposito berjangka yang ditempatkan pada bank              placed at a state-owned bank.
      pemerintah.

      Pemegang IUP-Operasi Produksi, ketentuannya                An IUP-Production Operation holder, among other
      antara lain, harus menyiapkan (1) rencana                  requirements, must (1) prepare a five-year
      reklamasi lima tahunan; (2) rencana pascatambang;          reclamation plan; (2) prepare a post-mining plan;
      (3) menyediakan jaminan reklamasi yang dapat               (3) provide a reclamation guarantee which may be in
      berupa rekening bersama atau deposito berjangka            the form of a joint account or time deposit placed at
      yang ditempatkan pada bank pemerintah, bank                a state-owned bank, a bank guarantee, or an
      garansi, atau cadangan akuntansi (bila memenuhi            accounting provision (if it meets the requirements);
      persyaratan); dan (4) menyediakan jaminan                  and (4) provide a post-mine guarantee in the form of
      pascatambang berupa deposito berjangka yang                a time deposit at a state-owned bank.
      ditempatkan di bank pemerintah.

      Penempatan jaminan reklamasi dan jaminan                   The requirement to provide a reclamation guarantee
      pascatambang tidak menghilangkan kewajiban                 and a post-mining guarantee does not release the
      pemegang IUP dari ketentuan untuk melaksanakan             IUP holder from the requirement to perform
      aktivitas reklamasi dan pascatambang.                      reclamation and post-mining activities.
Page 166
                                                   PT ADARO ENERGY INDONESIA Tbk
                                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                  Lampiran 5/154 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                        FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                    30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                 (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                          unless otherwise stated)

41.   JAMINAN   REKLAMASI                         DAN          PENUTUPAN          41.    RECLAMATION GUARANTEES                           AND         MINE
      TAMBANG (lanjutan)                                                                 CLOSURE (continued)

      Pada tanggal 3 Mei 2018, KESDM mengeluarkan                                        On 3 May 2018, the MoEMR issued Ministerial
      Peraturan Menteri No. 26/2018 (“Permen ESDM                                        Regulation No. 26/2018 (“Permen ESDM 26/2018”)
      26/2018”) mengenai prinsip pertambangan dan                                        regarding proper mining principles and supervision in
      pengawasan       yang      tepat   dalam      aktivitas                            mineral and coal mining activities, and on 7 May
      pertambangan mineral dan batubara, dan pada                                        2018, the MoEMR issued Ministerial Decree No.
      tanggal 7 Mei 2018, KESDM mengeluarkan                                             1827 K/30/MEM/2018 (“Kepmen ESDM”) regarding
      Keputusan Menteri No. 1827 K/30/MEM/2018                                           guidelines for proper mining techniques and
      (“Kepmen ESDM”) mengenai pedoman untuk teknik                                      principles. As of the effective date of these
      dan prinsip pertambangan yang tepat. Pada tanggal                                  regulations, Ministerial Regulation No. 07/2014
      peraturan ini berlaku efektif, Peraturan Menteri                                   regarding mine reclamation and post-mining
      No. 07/2014 mengenai reklamasi dan pascatambang                                    activities in mineral and coal mining activities was
      pada kegiatan usaha pertambangan mineral dan                                       revoked and is no longer valid. From time to time, AI,
      batubara dicabut dan tidak berlaku lagi. Dari waktu ke                             the AMC entities, PC, RC, PCS, SCM, LSA, MIP, and
      waktu, AI, entitas-entitas AMC, PC, RC, PCS, SCM,                                  BEE can review or revise existing plans, including
      LSA, MIP dan BEE dapat melakukan peninjauan atau                                   reclamation and post-mining plans in accordance
      revisi terhadap rencana-rencana yang telah ada,                                    with the applicable regulations.
      termasuk diantaranya adalah rencana reklamasi dan
      pascatambang sesuai ketentuan yang berlaku.

      Kepmen ESDM No. 1827 K/30/MEM/2018                                                 Kepmen ESDM No. 1827 K/30/MEM/2018 states that
      menyatakan bahwa perusahaan wajib memberikan                                       a company is required to provide mine reclamation
      jaminan reklamasi dan pascatambang yang dapat                                      and post-mining guarantees which may be in form of
      berupa deposito berjangka, garansi bank, atau                                      a time deposit, bank guarantee or accounting
      cadangan akuntansi yang semuanya mempunyai                                         reserve, all of which have a duration corresponding
      jangka waktu sesuai dengan jadwal reklamasi.                                       to the reclamation schedule.

      Tabel dibawah ini menunjukkan jaminan reklamasi                                    The below table sets out reclamation guarantees that
      yang diwajibkan dan ditempatkan oleh Grup pada                                     are required and have been placed by the Group as
      tanggal 30 September 2024 dan 31 Desember 2023                                     at 30 September 2024 and 31 December 2023:
      adalah sebagai berikut:

                                      Surat Keputusan/Decree                               Jumlah penempatan/Placed amount
         Perusahaan/                                                         Periode/
                                                                                                                                        Bentuk/Form
            Entity                                                            Period       30 September         31 Desember/
                               Nomor/Number                 Tanggal/Date
                                                                                               2024            December 2023
       Dalam Rupiah (nilai penuh)/In Rupiah (full amount)

              AI               467/30/DJB/2013               19 Maret/       2013-2017    Rp618,973,877,677   Rp411,827,271,342    Bank garansi/
                                                           March 2013                                                                Bank guarantees
                              629/30/DJB/2013             12 April 2013
                             968/37.03/DBT/2014           23 April 2014
                              674/30/DJB/2014             25 April 2014
                              1178/30/DJB/2015           27 Juli/July 2015
                              755/30/DJB/2016           27 Mei/May 2016
                              1153/30/DJB/2017          31 Mei/May 2017
                              2776/30/DJB/2017            29 Desember/       2018-2022
                                                         December 2017
                             576/37.06/DJB/2018              21 Maret/
                                                           March 2018
                             666/37.06/DJB/2019            27 Februari/      2019-2022
                                                          February 2019
                             1120/37.06/DJB/2019        17 Juni/June 2019
                             221/37.06/DJB/2020             7 Februari/        2020
                                                          February 2020
                             121/37/DBT.PL/2020         11 Mei/May 2020      2013-2019
                                B-1942/MB.07/           20 Mei/May 2021      2013-2020
                                 DBT.PL/2021
                              B-77/MB.07/DJB.T/             6 Januari/       2014-2020
                                     2022                 January 2022
                                B-3252/MB.07/           17 Juni/June 2022      2021
                                 DBT.PL/2022
                                 T-485/MB.07/             12 Oktober/        2014-2021
                                 MEM.B/2022              October 2022
                                 T-231/MB.07/              14 Maret/         2023-2027
                                 MEM.B/2023               March 2023
                                T-4135/MB.07            11 Juli/July 2023      2022
                                /DBT.PL/2023

             MIP              540/625/Pertamb/          30 Juni/June 2014    2014-2018      Rp1,502,688,591     Rp1,502,688,591    Deposito bersama pada
                                    2014                                                                                             bank pemerintah/
                              540/3495/DESDM/            31 Desember/        2019-2023      Rp7,003,825,910     Rp7,003,825,910      Joint time deposits at
                                  IV-1/2019             December 2019                                                                a state-owned bank
                                B-998/Mb.07/            28 Mei/May 2024      2024-2028      Rp3,570,053,902                    -
                                 DJB.T/2024
Page 167
                                                    PT ADARO ENERGY INDONESIA Tbk
                                               DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                   Lampiran 5/155 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                   unless otherwise stated)

41.   JAMINAN   REKLAMASI                          DAN         PENUTUPAN                 41.      RECLAMATION GUARANTEES                          AND         MINE
      TAMBANG (lanjutan)                                                                          CLOSURE (continued)

      Tabel dibawah ini menunjukkan jaminan reklamasi                                             The below table sets out reclamation guarantees that
      yang diwajibkan dan ditempatkan oleh Grup pada                                              are required and have been placed by the Group as
      tanggal 30 September 2024 dan 31 Desember 2023                                              at 30 September 2024 and 31 December 2023:
      adalah sebagai berikut: (lanjutan)                                                          (continued)

                                       Surat Keputusan/Decree                                        Jumlah penempatan/Placed amount
         Perusahaan/                                                                Periode/
                                                                                                                                                 Bentuk/Form
            Entity                                                                   Period         30 September         31 Desember/
                                Nomor/Number              Tanggal/Date
                                                                                                        2024            December 2023
       Dalam Rupiah (nilai penuh) (lanjutan)/In Rupiah (full amount) (continued)
                                                                                                                                            Deposito bersama pada
             BEE                  540/2626/               13 September             2016-2017                       -      Rp319,735,106       bank pemerintah/
                              Dispertamben/2016               2016                                                                            Joint time deposits at
                                                                                                                                              a state-owned bank

              KC               935/30/DJB/2015          26 Juni/June 2015          2015-2016         Rp1,728,181,592     Rp1,728,181,592    Deposito berjangka/
                             1049/37.06/DJB/2018        25 Juni/June 2018          2018-2019                                                  Time deposits
                             1228/37.06/DJB/2019         5 Juli/July 2019          2019-2020

             SBC               938/30/DJB/2015          26 Juni/June 2015          2015-2016         Rp1,577,857,027     Rp1,577,857,027    Deposito berjangka/
                             1240/37.06/DJB/2019         8 Juli/July 2019          2019-2020                                                   Time deposits

              JC             1048/37.06/DJB.2018        25 Juni/June 2018          2018-2019         Rp4,722,665,500     Rp4,722,665,500    Deposito berjangka/
                             1227/37.06/DJB/2019         5 Juli/July 2019          2019-2020                                                  Time deposits

              LC             B-1406/MB.07/DJB.T/           4 April 2022               2022           Rp2,555,416,000     Rp2,555,416,000    Deposito berjangka/
                                    2022                                                                                                      Time deposits

              PC             1051/37.06/DJB/2018        25 Juni/June 2018          2019-2020         Rp2,981,083,800     Rp2,981,083,800    Deposito berjangka/
                             B-1556/MB.07/DJB.T/          28 Desember/             2022-2023                                                  Time deposits
                                    2021                 December 2021

              RC             1047/37.06/DJB/2018        25 Juni/June 2018          2019-2020         Rp1,290,635,000     Rp1,290,635,000    Deposito berjangka/
                             B-1064/MB.07/DJB.T/            10 Maret/              2022-2023                                                  Time deposits
                                    2022                   March 2022
             SCM
                              1641/30/DJB/2016          17 November 2016           2014-2018                       -                    -   Bank garansi/
                              2588/30/DJB/2017          30 November 2017           2017-2018                                                  Bank guarantees
                             1983/37.06/DJB/2018        23 November 2018           2014-2017
                             2309/37.06/DJB/2018           21 Desember/              2018
                                                          December 2018
                             1526/37.06/DJB/2019           11 September            2019-2023
                                                               2019
                             1164/37/DBT.PL/2020         3 November 2020           2014-2018        Rp13,489,322,700    Rp15,756,620,700    Deposito berjangka/
                              T-7/MB.07/MEM.B                3 Januari/            2014-2018,                                                 Time deposits
                                    /2023                  January 2023
                             B-2404/MB.07/DJB.T/           19 Desember/            2019-2023
                                     2023                 December 2023

             LSA              1622/30/DJB/2016          24 November 2016            2016-2020        Rp2,974,386,900     Rp2,974,386,900    Bank garansi/
                              2583/30/DJB/2017          30 November 2017            2016-2020                                                 Bank guarantees
                             1913/37.06/DJB/2018        14 November 2018           2016, 2018-
                                                                                      2020
                              15/37.03/DBT/2020             6 Januari/             2016-2020
                                                          January 2020
                                B-1942/MB.07/            20 Mei/May 2021             2016,
                                 DBT.PL/2021                                       2018-2020
                              789/MB.07.09/DJB/            9 April 2021            2021-2025         Rp1,423,984,000      Rp736,681,000     Deposito berjangka/
                                    2021                                                                                                      Time deposits
                             T-813/MB.07/MEM.B/           7 Desember/               2016-2020,
                                    2022                 December 2022                 2021
                             T-808/MB.07/MEM.B/            4 Oktober/              2019 - 2021,
                                    2023                  October 2023                 2022
                             T-812/MB.07/MEM.B/            4 Oktober/              2021 - 2025
                                    2023                  October 2023

             PCS              1640/30/DJB/2016          17 November 2016           2018-2022                       -                    -   Bank garansi/
                             1240/37.06/DJB/2018         21 Juli/July 2018         2018-2022                                                  Bank guarantees
                             2006/37.06/DJB/2019        26 November 2019           2019-2022        Rp25,192,258,187    Rp25,192,258,187    Deposito berjangka/
                                                                                                                                              Time deposits
                           T-812/MB.07/MEM.B/            7 Desember/                  2022
                                    2022                December 2022
       Dalam ribuan AS Dolar/In thousands of US Dollars

              LC               2609/30/DJB/2017             6 Desember/            2018-2021               US$3,278            US$3,273     Bank garansi/
                                                          December 2017                                                                       Bank guarantees
                             121/37/DBT.PL/2020          11 Mei/May 2020             2019
                             2244/37.06/DJB/2019           26 Desember/            2016-2018
                                                          December 2019
                              198/37.06/DJB/2020             5 Februari/           2020-2021
                                                           February 2020
                             1164/37/DBT.PL/2020         3 November 2020           2016-2018,
                                                                                      2020
                                 B-1942/MB.07/           20 Mei/May 2021           2019-2020
                                  DBT.PL/2021
                                 B-5373/MB.07/          14 November 2021           2016-2020
                                  DBT.PL/2021
                                 B-3252/MB.07/          17 Juni/June 2022             2021
                                  DBT.PL/2022
                                 B-6865/MB.07/          25 November 2022           2016-2021
                                  DBT.PL/2022
                                 T-6974/MB.07/          18 November 2023           2016-2021
                                  DBT.PL/2023
                                 B-890/MB.07/            13 Mei/May 2024           2022-2026
                                   DJB.T/2024
Page 168
                                                   PT ADARO ENERGY INDONESIA Tbk
                                              DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                                  Lampiran 5/156 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                          30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                unless otherwise stated)

41.   JAMINAN   REKLAMASI                          DAN         PENUTUPAN           41.        RECLAMATION GUARANTEES                         AND         MINE
      TAMBANG (lanjutan)                                                                      CLOSURE (continued)
      Tabel dibawah ini menunjukkan jaminan reklamasi                                         The below table sets out reclamation guarantees that
      yang diwajibkan dan ditempatkan oleh Grup pada                                          are required and have been placed by the Group as
      tanggal 30 September 2024 dan 31 Desember 2023                                          at 30 September 2024 and 31 December 2023:
      adalah sebagai berikut: (lanjutan)                                                      (continued)

                                       Surat Keputusan/Decree                                     Jumlah penempatan/Placed amount
       Perusahaan/                                                                Periode/                                                  Bentuk/Form
          Entity                                                                   Period        30 September        31 Desember/
                               Nomor/Number                    Tanggal/Date                          2024           December 2023
       Dalam ribuan AS Dolar/In thousands of US Dollars (continued)

           MC                 2755/30/DJB/2017                28 Desember/        2017-2021           US$11,436           US$11,098    Bank garansi/
                                                             December 2017                                                               Bank guarantees
                               B-1942/MB.07/                 20 Mei/May 2021      2019-2020
                               DBT.PL/2021
                               B-5373/MB.07/                14 November 2021      2017-2020
                               DBT.PL/2021
                               B-3252/MB.07/                 17 Juni/June 2022      2021
                               DBT.PL/2022
                            1164/37/DBT.PL/2020              3 November 2020      2017-2019
                           B-6865/MB.07/DBT.PL              25 November 2022      2017-2021
                                   /2022                                                                                               Deposito berjangka/
                         T-6974/MB.07/DBT.PL/2023            18 November 2023     2017-2021            US$4,715            US$4,715      Time deposits
                         B-595/MB.07/DBT.PL/2023            27 Maret/March 2024   2024-2026
                         B-1404/MB.07/DJB.T/ 2022               4 April 2022      2022-2026

            PC              CCoW pasal/article 7                      -               -                  US$100             US$100     Deposito berjangka/
                            1352/87.04/SDP/1999               8 Juli/July 1999                                                           Time deposits

           SBC               513/MB.07.09/DJB/              5 Maret/March 2021    2020-2024              US$158             US$158     Deposito berjangka/
                                   2021                                                                                                  Time deposits

            KC              537/37.06.DJB/2020                 30 April 2020      2020-2024              US$499             US$499     Bank garansi/
                            1476/37.06/DJB/2020                8 Desember/        2021-2024                                              Bank guarantees
                                                             December 2020
                               B-1942/MB.07/                 20 Mei/May 2021        2020
                               DBT.PL/2021
                               B-5373/MB.07/                14 November 2021        2020
                               DBT.PL/2021
                           B-6865/MB.07/DBT.PL              25 November 2022        2020
                                   /2022
                         T-6974/MB.07/DBT.PL/2023           18 November 2023        2020

            JC              589/37.06/DJB/2020               13 Mei/May 2020      2020-2024            US$1,963            US$1,963    Bank garansi/
                            1477/37.06/DJB/2020                8 Desember/        2021-2024                                              Bank guarantees
                                                             December 2020
                               B-1942/MB.07/                 20 Mei/May 2021        2020
                               DBT.PL/2021
                               B-5373/MB.07/                14 November 2021        2020
                               DBT.PL/2021
                           B-6865/MB.07/DBT.PL              25 November 2022        2020
                                   /2022
                         T-6974/MB.07/DBT.PL/2023           18 November 2023        2020

      Tabel   dibawah   ini   menunjukkan      jaminan                                        The below table sets out post-mining guarantees that
      pascatambang yang diwajibkan dan ditempatkan                                            are required and have been placed by the Group as
      oleh Grup pada tanggal 30 September 2024 dan                                            at 30 September 2024 and 31 December 2023:
      31 Desember 2023 adalah sebagai berikut:
                                                                                  Periode/
                                        Surat Keputusan/Decree                     Period         Jumlah penempatan/Placed amount           Bentuk/Form
       Perusahaan/
          Entity                                                                                 30 September        31 Desember/
                               Nomor/Number                    Tanggal/Date
                                                                                                     2024           December 2023
       Dalam Rupiah (nilai penuh)/In Rupiah (full amount)

           MIP                540/1042/Pertamb/              2 Juni/June 2010     2012-2020     Rp18,538,728,642    Rp18,538,728,642   Deposito bersama pada
                                    2010                                                                                                 bank pemerintah/
                                                                                                                                         Joint time deposits at
                          T-243/MB.07/MEM.B/ 2023                15 Maret/        2021-2028      Rp7,029,979,292     Rp3,435,103,492     a state-owned bank
                                                                March 2023

           BEE               545/1181/Tamben-II/             22 November 2011     2014-2038                     -    Rp6,249,876,209   Deposito bersama pada
                                    2011                                                                                                 bank pemerintah/
                                                                                                                                         Joint time deposits at
                                                                                                                                         a state-owned bank

           SCM            1042/MB.07.09/DJB/2021              4 Mei/May 2021      2021-2027      Rp8,383,450,699     Rp4,098,575,897   Deposito berjangka/
                                                                                                                                         Time deposits

           LSA            1040/MB.07.09/DJB/2021              4 Mei/May 2021      2021-2032      Rp9,805,842,308     Rp5,745,610,727   Deposito berjangka/
                                                                                                                                         Time deposits

           PCS            B-1056/MB.07/DJB.T/ 2021              28 Oktober/       2020-2029      Rp3,363,504,492     Rp1,644,379,974   Deposito berjangka/
                                                               October 2021                                                              Time deposits
Page 169
                                                  PT ADARO ENERGY INDONESIA Tbk
                                             DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                             Lampiran 5/157 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                              FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                                          30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                                       (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                                unless otherwise stated)

41.   JAMINAN   REKLAMASI                       DAN       PENUTUPAN                  41.      RECLAMATION GUARANTEES                      AND        MINE
      TAMBANG (lanjutan)                                                                      CLOSURE (continued)
      Tabel dibawah ini menunjukkan jaminan                                                The below table sets out post-mining guarantees that
      pascatambang yang diwajibkan dan ditempatkan                                         are required and have been placed by the Group as at
      oleh Grup pada tanggal 30 September 2024 dan                                         30 September 2024 and 31 December 2023:
      31 Desember 2023 adalah sebagai berikut:                                             (continued)
      (lanjutan)

                                           Surat Keputusan/Decree                                      Jumlah penempatan/Placed amount
       Perusahaan/                                                                         Periode/
                                                                                                                                             Bentuk/Form
          Entity                                                                            Period     30 September      31 Desember/
                                     Nomor/Number                    Tanggal/Date
                                                                                                           2024         December 2023
       Dalam ribuan AS Dolar/In thousands of US Dollars

            LC                      825/30/DJB/2016                 8 Juni/June 2016       2016-2018        US$4,901           US$4,901   Deposito berjangka/
                                                                                                                                            Time deposits

            MC                  B-737/MB.07/DJB.T/2024               22 April 2024         2018-2037        US$3,401           US$5,458   Deposito berjangka/
                                                                                                                                            Time deposits

            AI                      279/30/DJB/2013                   14 Februari/         2014-2020       AS$27,960          US$27,960   Deposito berjangka/
                                                                     February 2013                                                          Time deposits




42.   ASET DAN LIABILITAS KEUANGAN                                                   42.      FINANCIAL ASSETS AND LIABILITIES

      Pada tanggal 30 September 2024, Grup                                                    As at 30 September 2024, the Group classified its
      mengklasifikasikan kas dan setara kas, piutang                                          cash and cash equivalents, trade receivables, other
      usaha, piutang lain-lain, kas dan deposito berjangka                                    receivables, restricted cash and time deposits, loans
      yang dibatasi penggunaannya, pinjaman untuk pihak                                       to third parties, loans to related parties, other current
      ketiga, pinjaman untuk pihak berelasi, aset lancar                                      assets, service concession receivables and other
      lain-lain, piutang jasa konsesi dan aset tidak lancar                                   non-current assets amounting to US$4,259,950
      lain-lain sebesar AS$4.259.950 (31 Desember 2023:                                       (31 December 2023: US$4,389,023) as financial
      AS$4.389.023) sebagai aset keuangan yang diukur                                         assets at amortised cost and financial assets at
      pada biaya perolehan diamortisasi dan aset                                              FVOCI and FVTPL amounting to US$505,849
      keuangan pada nilai wajar melalui penghasilan                                           (31 December 2023: US$487,691) and US$66,515
      komprehensif lain dan melalui laba rugi masing-                                         (31 December 2023: US$61,768), respectively.
      masing sebesar AS$505.849 (31 Desember 2023:
      AS$487.691) dan AS$66.515 (31 Desember 2023:
      AS$61.768).

      Pada tanggal 30 September 2024, Grup                                                    As at 30 September 2024, the Group classified its
      mengklasifikasikan utang usaha, utang dividen,                                          trade payables, dividends payable, accrued
      beban yang masih harus dibayar, pinjaman dari pihak                                     expenses, loans from third parties, other liabilities,
      ketiga, utang lain-lain, liabilitas sewa, utang bank dan                                lease liabilities, bank loans and Senior Notes
      Senior Notes sebesar AS$2.068.636 (31 Desember                                          amounting to US$2,068,636 (31 December 2023:
      2023: AS$2.387.913) sebagai liabilitas keuangan                                         US$2,387,913) as financial liabilities carried at
      yang diukur pada biaya perolehan diamortisasi.                                          amortised cost.


43.   MANAJEMEN RISIKO KEUANGAN                                                  43.         FINANCIAL RISK MANAGEMENT

      Berbagai aktivitas yang dilakukan membuat Grup                                         The Group’s activities are exposed to a variety of
      terekspos terhadap berbagai risiko keuangan: risiko                                    financial risks: market risk (including the effects of
      pasar (termasuk dampak risiko nilai tukar mata uang                                    foreign currency exchange rate risk, commodity price
      asing, risiko tingkat harga komoditas, dan risiko                                      risk and interest rate risk), credit risk and liquidity risk.
      tingkat suku bunga), risiko kredit, dan risiko likuiditas.                             The objectives of the Group’s risk management
      Tujuan dari proses manajemen risiko Grup adalah                                        processes are to identify, measure, monitor and
      untuk mengidentifikasi, mengukur, mengawasi, dan                                       manage key risks in order to safeguard the Group’s
      mengelola risiko dasar dalam upaya melindungi                                          long-term business continuity and to minimise
      kesinambungan bisnis dalam jangka panjang dan                                          potential adverse effects on the financial performance
      meminimalkan dampak yang tidak diharapkan pada                                         of the Group.
      kinerja keuangan Grup.

      Grup menggunakan berbagai metode untuk                                                 The Group uses various methods to measure the risk
      mengukur risiko yang dihadapinya. Metode ini                                           to which it is exposed. These methods include
      meliputi analisis sensitivitas untuk risiko tingkat suku                               sensitivity analysis in the case of interest rates,
      bunga, nilai tukar dan risiko harga lainnya dan                                        foreign exchange and other price risks and aging
      analisis umur piutang untuk risiko kredit.                                             analysis for credit risk.
Page 170
                                         PT ADARO ENERGY INDONESIA Tbk
                                    DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                 Lampiran 5/158 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

43.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                       43.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan                                       (1) Financial risk factors

          a.   Risiko pasar                                                a.   Market risk

               (i)   Risiko nilai tukar mata uang asing                         (i)   Foreign exchange risk

                     Pembiayaan dan sebagian besar                                    The financing and the majority of the
                     pendapatan dan pengeluaran operasi                               revenue and operating expenditure of
                     dari entitas anak yang beroperasi dari                           the operating subsidiaries of the
                     Perusahaan didenominasi dalam mata                               Company are denominated in US
                     uang Dolar AS, yang secara tidak                                 Dollars, which indirectly represents a
                     langsung merupakan lindung nilai alami                           natural hedging on exposure to
                     (natural hedging) terhadap eksposur                              fluctuations in foreign exchange rates.
                     fluktuasi nilai tukar mata uang asing.                           However, the Group is exposed to
                     Namun, Grup memiliki eksposur                                    foreign exchange risk arising from
                     terhadap risiko mata uang asing yang                             dividend payments to the shareholders
                     timbul dari pembayaran dividen kepada                            and other operating expenses in
                     pemegang saham dan biaya operasi                                 Rupiah.
                     lainnya dalam mata uang Rupiah.

                     Manajemen telah membuat kebijakan                                Management has set up a policy to
                     untuk mengelola risiko nilai tukar mata                          require companies within the Group to
                     uang asing terhadap mata uang                                    manage their foreign exchange risk
                     fungsional perusahaan dalam Grup.                                against their functional currency. As at
                     Pada tanggal 30 September 2024, jika                             30 September 2024, if Rupiah had
                     Rupiah melemah/menguat sebesar                                   weakened/strengthened            by 10%
                     10% terhadap Dolar AS dengan semua                               against the US Dollars with all other
                     variabel     konstan,      laba   setelah                        variables held constant, the post-tax
                     pajak dalam periode berjalan akan                                profit for the period would have been
                     menjadi lebih rendah AS$23.461                                   US$23,461 lower or US$28,651 higher
                     atau menjadi lebih tinggi AS$28.651                              (31 December 2023: US$46,952 lower
                     (31 Desember 2023: lebih rendah                                  or US$56,567 higher), respectively,
                     AS$46.952 atau menjadi lebih tinggi                              mainly as a result of foreign exchange
                     AS$56.567), terutama diakibatkan                                 gains/losses on the translation of cash
                     penjabaran           keuntungan/kerugian                         and cash equivalents, restricted cash
                     translasi kas dan setara kas, kas dan                            and time deposits, trade receivables,
                     deposito berjangka yang dibatasi                                 other investments, loans to third
                     penggunaannya,          piutang    usaha,                        parties, loans to related parties,
                     investasi lain-lain, pinjaman untuk pihak                        service concession receivables, other
                     ketiga, pinjaman untuk pihak berelasi,                           non-current assets, trade payables,
                     piutang jasa konsesi, aset tidak lancar                          accrued expenses, bank loan, lease
                     lain-lain, utang usaha, beban yang                               liabilities and other liabilities.
                     masih harus dibayar, utang bank,
                     liabilitas sewa dan utang lain-lain.

               (ii) Risiko harga                                                (ii) Price risk

                     Operasi Grup terekspos terhadap risiko                           The Group’s operations are exposed to
                     pasar terkait dengan fluktuasi harga                             market risks related to the price
                     dari       harga    komoditas    yang                            volatility of commodity prices traded on
                     diperdagangkan di pasar batubara                                 world coal markets. However, the
                     dunia. Namun demikian, aset dan                                  Group’s financial assets and liabilities
                     liabilitas    keuangan   Grup    tidak                           are not significantly exposed to the
                     terekspos secara signifikan terhadap                             price volatility of world coal markets
                     fluktuasi harga batubara dunia karena                            because the settlement of financial
                     penyelesaian aset dan liabilitas                                 assets and liabilities is based on the
                     keuangan berdasarkan harga yang                                  prices stipulated in the coal sales and
                     tercantum dalam kontrak jual beli                                purchase agreements that will be
                     batubara yang ditentukan pada saat                               determined at the time of delivery.
                     pengiriman.
Page 171
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/159 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

43.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                      43.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                           (1) Financial risk factors (continued)

          a.   Risiko pasar (lanjutan)                                    a.   Market risk (continued)

               (ii) Risiko harga (lanjutan)                                    (ii) Price risk (continued)

                   Grup terekspos risiko harga yang                                 The Group is exposed to price risk from
                   berasal dari investasi yang dicatat                              investments that are carried at FVTPL
                   sebesar nilai wajar melalui laba rugi                            or financial assets at FVOCI and
                   atau aset keuangan pada nilai wajar                              FVTPL.
                   melalui penghasilan komprehensif lain
                   dan melalui laba rugi.

                   Untuk mengelola risiko harga yang                               To manage the price risk arising from
                   timbul dari investasi efek yang tidak                           investments in unlisted securities, the
                   diperdagangkan di bursa, Grup                                   Group diversifies its portfolio. The
                   melakukan diversifikasi portofolionya.                          performance     of      the    Group’s
                   Kinerja investasi Grup yang diukur                              investments at FVTPL or FVOCI is
                   pada nilai wajar melalui laba rugi atau                         monitored periodically.
                   melalui penghasilan komprehensif lain
                   dimonitor secara periodik.

                   Pada tanggal 30 September 2024,                                 As at 30 September 2024, if the price of
                   apabila harga atas investasi lain-lain                          the Group’s other investments at
                   Grup yang diukur pada nilai wajar                               FVTPL or FVOCI had been 5% higher
                   melalui laba rugi atau melalui                                  or lower with all other variables held
                   penghasilan komprehensif lain 5%                                constant, total equity would have
                   lebih tinggi atau lebih rendah dengan                           increased or decreased by US$28,618
                   asumsi      variabel    lainnya  tidak                          (31 December 2023: US$27,473).
                   mengalami perubahan, maka total
                   ekuitas akan naik atau turun sebesar
                   AS$28.618 (31 Desember 2023:
                   AS$27.473).

               (iii) Risiko suku bunga                                         (iii) Interest rate risk

                   Risiko suku bunga Grup terutama                                 The Group’s interest rate risk
                   timbul dari pinjaman jangka panjang.                            arises from long-term borrowings. The
                   Risiko suku bunga dari kas tidak                                interest rate risk on cash is not
                   signifikan dan semua instrumen                                  significant and all other financial
                   keuangan lainnya tidak dikenakan                                instruments are not interest bearing.
                   bunga. Pinjaman yang diterbitkan                                Borrowings issued at variable rates
                   dengan     tingkat  bunga    variabel                           expose the Group to cash flow interest
                   mengekspos Grup terhadap risiko suku                            rate risk.
                   bunga arus kas.

                    Grup menganalisis eksposur dari risiko                         The Group analyses its interest rate
                    bunga secara dinamis. Beberapa                                 exposure on a dynamic basis. Various
                    skenario      disimulasikan     dengan                         scenarios are simulated taking into
                    beberapa       pertimbangan      seperti                       consideration the refinancing of
                    pembiayaan kembali, memperbaharui                              existing positions, and alternative
                    dari kondisi yang ada dan alternatif lain                      financing. Based on the above
                    pembiayaan. Berdasarkan skenario                               scenarios, the Group manages its cash
                    tersebut diatas, Grup mengelola risiko                         flows interest rate risk by refinancing
                    arus kas dari suku bunga dengan                                borrowings at a lower interest rate.
                    melakukan pembiayaan pinjaman
                    dengan suku bunga yang lebih rendah.
Page 172
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/160 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

43.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                    43.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                         (1) Financial risk factors (continued)

          a.   Risiko pasar (lanjutan)                                  a.   Market risk (continued)

               (iii) Risiko suku bunga (lanjutan)                            (iii) Interest rate risk (continued)

                    Pada tanggal 30 September 2024, jika                          As at 30 September 2024, if interest
                    tingkat suku bunga atas pinjaman                              rates on long-term borrowings had
                    jangka panjang 10 basis poin lebih                            been 10 basis points higher/lower with
                    tinggi/lebih rendah, dengan asumsi                            all other variables held constant, the
                    semua variabel lain konstan, laba                             post-tax profit for the period would have
                    setelah pajak untuk periode berjalan                          been US$548 (31 December 2023:
                    akan menjadi lebih rendah/tinggi                              US$578) lower/higher.
                    sebesar AS$548 (31 Desember 2023:
                    AS$578).

          b.   Risiko kredit                                            b.   Credit risk

               Pada tanggal 30 September 2024, total                         As at 30 September 2024, the total
               maksimum eksposur dari risiko kredit adalah                   maximum exposure from credit risk was
               AS$4.832.128       (31 Desember 2023:                         US$4,832,128 (31 December 2023:
               AS$4.938.377). Risiko kredit terutama                         US$4,938,377). Credit risk arises from cash
               berasal dari kas di bank, deposito                            in banks, time deposits, financial assets at
               berjangka, aset keuangan pada nilai wajar                     FVOCI and FVTPL, trade receivables, other
               melalui penghasilan komprehensif lain dan                     receivables, restricted cash and time
               melalui laba rugi, piutang usaha, piutang                     deposits, loans to third parties, loans to
               lain-lain, kas dan deposito berjangka yang                    related parties, other current assets, service
               dibatasi penggunaannya, pinjaman untuk                        concession receivables and other non-
               pihak ketiga, pinjaman untuk pihak berelasi,                  current assets.
               aset lancar lain-lain, piutang jasa konsesi
               dan aset tidak lancar lain-lain.

               Semua kas di bank, deposito berjangka, kas                    All cash in banks, time deposits, restricted
               dan deposito berjangka yang dibatasi                          cash and time deposits are placed in
               penggunaannya ditempatkan di bank asing                       reputable foreign and local banks.
               dan lokal yang memiliki reputasi.

               Manajemen yakin akan kemampuannya                             Management is confident in its ability to
               untuk     terus    mengendalikan     dan                      continue to control and maintain minimal
               mempertahankan eksposur yang minimal                          exposure to credit risk, since the Group has
               terhadap risiko kredit mengingat Grup                         clear policies on the selection of customers,
               memiliki kebijakan yang jelas dalam                           legally binding agreements in place for coal
               pemilihan pelanggan, perjanjian yang                          sales, mining services and other services
               mengikat secara hukum untuk penjualan                         rendered, and historically low levels of bad
               batubara, jasa penambangan, dan jasa                          debts in trade receivables.
               lainnya yang telah dilakukan, dan secara
               historis mempunyai tingkat yang rendah
               untuk piutang usaha yang bermasalah.
Page 173
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/161 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                             (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                      unless otherwise stated)

43.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                     43.   FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                          (1) Financial risk factors (continued)

          b.   Risiko kredit (lanjutan)                                  b.   Credit risk (continued)

               Kebijakan umum Grup untuk penjualan                            The Group’s general policies for coal sales
               batubara dan pemberian jasa untuk                              and rendering services to new and existing
               pelanggan yang sudah ada dan pelanggan                         customers are as follows:
               baru adalah sebagai berikut:

               -   memilih pelanggan (pada umumnya                            -   selecting customers (mostly blue-chip
                   adalah perusahaan pembangkit listrik                           power plant companies) with strong
                   unggulan) dengan kondisi keuangan                              financial    conditions and     good
                   yang kuat dan reputasi yang baik.                              reputations.

               -   menerima     pelanggan   baru dan                          -   acceptance of new customers and sales
                   penjualan batubara serta pemberian                             of coal and rendering services being
                   jasa disetujui oleh pihak yang                                 approved by the authorised personnel
                   berwenang sesuai dengan kebijakan                              according to the Group’s delegation of
                   delegasi kekuasaan Grup.                                       authority policy.

               -   meminta      pembayaran     dengan                         -   requesting payments by Letter of Credit
                   menggunakan Letter of Credit untuk                             for new customers.
                   pelanggan baru.

               Seluruh saldo terutang dari piutang usaha,                     The entire outstanding balances from trade
               piutang lain-lain, pinjaman untuk pihak                        receivables, other receivables, loans to third
               ketiga, pinjaman untuk pihak berelasi, aset                    parties, loans to related parties, other
               lancar lain-lain, piutang jasa konsesi dan                     current     assets,    service    concession
               aset tidak lancar lain-lain di atas terutama                   receivables and other non-current assets
               berasal dari pelanggan/pihak ketiga/pihak                      are mostly derived from customers/third
               berelasi yang sudah bertransaksi dengan                        parties/related     parties    which    have
               Grup lebih dari 12 bulan dan tidak memiliki                    transacted with the Group for more than 12
               sejarah wanprestasi yang material.                             months and do not have any history of
                                                                              material default.

          c.   Risiko likuiditas                                         c.   Liquidity risk

               Risiko likuiditas merupakan risiko yang                        Liquidity risk is defined as a risk that arises
               muncul dalam situasi dimana posisi arus kas                    in situations where the cash inflow from
               Grup mengindikasikan bahwa arus kas                            short-term revenue is not enough to cover
               masuk dari pendapatan jangka pendek tidak                      the cash outflow of short-term expenditure.
               cukup untuk memenuhi arus kas keluar                           To manage its liquidity risk, the Group
               untuk pengeluaran jangka pendek. Untuk                         monitors its level of cash and cash
               mengatur risiko likuiditas, Grup memonitor                     equivalents and maintains these at a level
               dan menjaga tingkat kas dan setara kas                         deemed adequate to finance the Group’s
               yang diperkirakan cukup untuk mendanai                         operational activities and to mitigate the
               kegiatan operasional Grup dan mengurangi                       effect of fluctuations in cash flow. The
               pengaruh fluktuasi arus kas. Manajemen                         Group’s management also regularly
               Grup juga secara rutin memonitor perkiraan                     monitors projected and actual cash flow,
               arus kas dan arus kas aktual, termasuk profil                  including loan maturity profiles and
               jatuh tempo pinjaman, dan secara terus-                        continuously assesses the financial markets
               menerus menilai kondisi pasar keuangan                         for opportunities to raise funds. In addition,
               untuk kesempatan memperoleh dana.                              the Group has a standby loan facility that
               Sebagai tambahan, Grup juga mengatur                           can be drawn down upon request to fund its
               untuk memiliki fasilitas stand-by loan yang                    operations as and when needed.
               dapat ditarik sesuai dengan permintaan
               untuk mendanai kegiatan operasi pada saat
               diperlukan.
Page 174
                                               PT ADARO ENERGY INDONESIA Tbk
                                          DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                     Lampiran 5/162 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                 FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                             30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                                          (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                                   unless otherwise stated)

43.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                             43.       FINANCIAL RISK MANAGEMENT (continued)

      (1) Faktor risiko keuangan (lanjutan)                                      (1) Financial risk factors (continued)

          c. Risiko likuiditas (lanjutan)                                                    c. Liquidity risk (continued)

             Tabel dibawah ini menganalisa liabilitas                                           The table below analyses the Group’s
             keuangan Grup pada tanggal pelaporan                                               financial liabilities at the reporting date into
             berdasarkan kelompok jatuh temponya dari                                           relevant maturity groupings based on the
             sisa periode hingga tanggal jatuh tempo                                            remaining period to the contractual maturity
             kontraktual. Jumlah yang diungkapkan dalam                                         date. The amounts disclosed in the table
             tabel ini adalah nilai arus kas kontraktual                                        represent contractual undiscounted cash
             yang tidak terdiskonto termasuk estimasi                                           flows including estimated interest payments:
             pembayaran bunga:
                                                                       Lebih dari tiga          Lebih dari satu
                                                                         bulan dan                tahun dan
                                                                      kurang dari satu         kurang dari lima
                                                                      tahun/More than          tahun/More than
                                                 Kurang dari tiga    three months and          one year and not        Lebih dari lima
                                                 bulan/Less than        not later than            later than          tahun/More than
                                                  three months            one year                five years             five years          Total

             30 September 2024
             Liabilitas keuangan/
             Financial liabilities
             Utang usaha/Trade payables                    372,350                       -                        -                      -       372,350
             Beban yang masih harus dibayar/
                Accrued expenses                           251,411                       -                        -                      -       251,411
             Utang lain-lain/Other liabilities               4,811                       -                        -                      -         4,811
             Pinjaman dari pihak ketiga/
                Loans from third parties                       238                  707                  11,765                   5,144           17,854
             Liabilitas sewa/Lease liabilities               8,008               23,234                  91,683                   1,227          124,152
             Utang bank/Bank loans                          65,417               71,315                 467,722                 161,148          765,602
             Senior Notes                                  714,919                    -                       -                       -          714,919

             Total                                       1,417,154               95,256                 571,170                 167,519        2,251,099


             31 Desember/December 2023
             Liabilitas keuangan/
             Financial liabilities
             Utang usaha/Trade payables                    344,743                       -                        -                      -       344,743
             Utang dividen/Dividends payable               429,510                       -                        -                      -       429,510
             Beban yang masih harus dibayar/
                Accrued expenses                           169,160                       -                        -                      -       169,160
             Utang lain-lain/Other liabilities               5,244                       -                        -                      -         5,244
             Pinjaman dari pihak ketiga/
                Loans from third parties                        52               2,645                      149                     637            3,483
             Liabilitas sewa/Lease liabilities               8,453              20,553                   81,955                   1,321          112,282
             Utang bank/Bank loans                          67,376             201,419                  391,697                 117,185          777,677
             Senior Notes                                        -             729,795                        -                       -          729,795

             Total                                       1,024,538             954,412                  473,801                 119,143        2,571,894


          Manajemen berpendapat bahwa tidak ada                                          Management is of the opinion that there is no
          masalah risiko likuiditas signifikan untuk Grup                                significant liquidity risk for the Group since the
          karena Grup memiliki modal kerja yang positif                                  Group has positive working capital and positive
          dan arus kas operasi yang positif.                                             operating cash flows.

      (2) Estimasi nilai wajar                                                  (2) Fair value estimation

          Nilai wajar aset dan liabilitas keuangan                                       The fair value of financial assets and liabilities is
          diestimasi untuk keperluan pengakuan dan                                       estimated for recognition and measurement or
          pengukuran      atau    untuk    keperluan                                     for disclosure purposes.
          pengungkapan.
Page 175
                                       PT ADARO ENERGY INDONESIA Tbk
                                  DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                               Lampiran 5/163 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                 30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                              (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                       unless otherwise stated)

43.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                     43.   FINANCIAL RISK MANAGEMENT (continued)

      (2) Estimasi nilai wajar (lanjutan)                            (2) Fair value estimation (continued)

          Nilai wajar adalah suatu jumlah dimana suatu                   The fair value is the amount for which an asset
          aset dapat dipertukarkan atau suatu liabilitas                 could be exchanged or a liability settled between
          diselesaikan antara pihak yang memahami dan                    knowledgeable and willing parties in an arm’s
          berkeinginan untuk melakukan transaksi wajar.                  length transaction.

          PSAK No. 113, “Pengukuran nilai wajar”,                        SFAS No. 113, “Fair value measurement”,
          mensyaratkan pengungkapan atas pengukuran                      requires disclosure of fair value measurements
          nilai wajar dengan tingkat hierarki nilai wajar                through the following fair value measurement
          sebagai berikut:                                               hierarchy:

             Harga dikutip (tidak disesuaikan) dalam                        Quoted prices (unadjusted) in active markets
              pasar aktif untuk aset atau liabilitas yang                     for identical assets or liabilities (Level 1);
              identik (Tingkat 1);

             Input selain harga yang dikutip dari pasar                     Inputs other than quoted prices included
              yang termasuk dalam Tingkat 1 yang dapat                        within Level 1 that are observable for the
              diobservasi untuk aset atau liabilitas, baik                    asset or liability, either directly (that is, as
              secara langsung (misalnya harga) atau                           prices) or indirectly (that is, derived from
              secara tidak langsung (misalnya turunan                         prices) (Level 2); and
              dari harga) (Tingkat 2); dan

             Input untuk aset atau liabilitas yang bukan                    Inputs for the asset or liability that are not
              berdasarkan data pasar yang dapat                               based on observable market data (that is,
              diobservasi (informasi yang tidak dapat                         unobservable inputs) (Level 3).
              diobservasi) (Tingkat 3).

          Tabel dibawah ini menggambarkan nilai tercatat                 The table below describes the carrying amount
          dan nilai wajar dari aset/liabilitas keuangan yang             and fair value of the financial assets/liabilities that
          tidak disajikan Grup pada nilai wajarnya:                      are not presented by the Group at fair value:

                                             Nilai tercatat/            Nilai wajar/
                                            Carrying amount             Fair value

          30 September 2024                                                                         30 September 2024
          Piutang lain-lain dari                                                            Other receivables from non-
           kepentingan non-pengendali                    66,600                      60,247        controlling interests
          Pinjaman untuk pihak ketiga                   198,466                     196,383        Loans to third parties
          Pinjaman untuk pihak berelasi                 145,942                     112,370     Loans to related parties
          Senior Notes                                  699,752                     699,343                 Senior Notes

          31 Desember 2023                                                                              31 December 2023
          Piutang lain-lain dari kepentingan                                                    Other receivables from non-
           non-pengendali                                66,600                      58,839            controlling interests
          Pinjaman untuk pihak ketiga                   197,089                     187,531            Loans to third parties
          Pinjaman untuk pihak berelasi                 143,637                     162,719         Loans to related parties
          Senior Notes                                  697,189                     683,942                     Senior Notes

          Utang bank merupakan liabilitas dengan tingkat                 Bank loans are liabilities with floating interest
          bunga mengambang, sehingga nilai tercatat                      rates, thus the carrying amount approximate
          setara dengan nilai wajar. Nilai wajar Senior                  their fair values. The fair value of Senior Notes is
          Notes diestimasi menggunakan harga dikutip                     estimated using the quoted market price as at 30
          dalam pasar aktif pada tanggal 30 September                    September 2024 and 31 December 2023. Fair
          2024 dan 31 Desember 2023. Pengungkapan                        value disclosure of Senior Notes is calculated
          nilai wajar Senior Notes dihitung menggunakan                  using Level 1 input.
          Tingkat 1.

          Pada tanggal 30 September 2024 dan                             As at 30 September 2024 and 31 December
          31 Desember 2023, nilai wajar investasi tertentu               2023, the fair values of certain other investments
          lainnya diukur menggunakan Tingkat 1 dari                      are measured using Level 1 of the fair value
          hierarki nilai wajar, sedangkan aset keuangan                  hierarchy, while financial assets at FVOCI and
          pada     nilai   wajar    melalui  penghasilan                 FVTPL are measured using Level 3 of the fair
          komprehensif lain dan laba rugi diukur                         value hierarchy.
          menggunakan Tingkat 3 dari hierarki nilai wajar.
Page 176
                                      PT ADARO ENERGY INDONESIA Tbk
                                 DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                              Lampiran 5/164 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                               30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                            (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                     unless otherwise stated)

43.   MANAJEMEN RISIKO KEUANGAN (lanjutan)                   43.   FINANCIAL RISK MANAGEMENT (continued)

      (2) Estimasi nilai wajar (lanjutan)                          (2) Fair value estimation (continued)

          Piutang lain-lain dari kepentingan non-                      Other receivables from non-controlling interest
          pengendali merupakan aset tak berbunga,                      are non-interest bearing assets. Thus, the
          sehingga nilai tercatat aset keuangannya tidak               carrying amount of the financial assets does not
          menunjukkan nilai wajarnya. Pada tanggal 30                  represent their fair value. As at 30 September
          September 2024 dan 31 Desember 2023,                         2024 and 31 December 2023, other receivables
          piutang lain-lain dari kepentingan non-                      from non-controlling interests are measured
          pengendali dihitung menggunakan Tingkat 3 dari               using Level 3 of the fair value hierarchy.
          hierarki nilai wajar.

          Nilai wajar aset keuangan dari konsesi jasa                  The fair value of financial assets of service
          menggunakan arus kas yang didiskontokan                      concession is measured using discounted cash
          berdasarkan tingkat suku bunga terakhir dari                 flows based on the interest rate of the latest
          aset    keuangan     dari  proyek   konsesi.                 financial assets of concession projects. Fair
          Pengungkapan nilai wajar aset keuangan dari                  value disclosure of financial assets from service
          proyek    konsesi   jasa   dihitung  dengan                  concession projects is calculated using Level 3
          menggunakan input Level 3.                                   inputs.

          Nilai tercatat dari aset dan liabilitas keuangan             The carrying amount of other financial assets
          lainnya telah berkisar menunjukkan nilai                     and liabilities approximate their fair values due to
          wajarnya karena memiliki sifat jangka pendek                 the short-term nature of the financial
          dari instrumen keuangannya.                                  instruments.

          Untuk periode yang berakhir pada tanggal                     For the period ended 30 September 2024 and
          30 September 2024 dan 31 Desember 2023,                      31 December 2023, there were no transfers
          tidak terdapat pengalihan antar tingkat.                     between levels.

      (3) Manajemen risiko permodalan                              (3) Capital risk management

          Dalam mengelola permodalannya, Grup                          In managing its capital, the Group safeguards its
          senantiasa mempertahankan kelangsungan                       ability to continue as a going concern and to
          usaha serta memaksimalkan manfaat bagi                       maximise benefits to the shareholders and other
          pemegang saham dan pemangku kepentingan                      stakeholders.
          lainnya.

          Grup secara aktif dan rutin menelaah dan                     The Group actively and regularly reviews and
          mengelola permodalannya untuk memastikan                     manages its capital to ensure the optimal capital
          struktur modal dan pengembalian yang optimal                 structure and return to the shareholders, taking
          bagi      pemegang       saham,      dengan                  into consideration the efficiency of capital use
          mempertimbangkan efisiensi penggunaan modal                  based on operating cash flows and capital
          berdasarkan arus kas operasi dan belanja                     expenditure and also consideration of future
          modal, serta mempertimbangkan kebutuhan                      capital needs.
          modal di masa yang akan datang.

          Grup      juga   berusaha    mempertahankan                  The Group also seeks to maintain a balance
          keseimbangan antara tingkat pinjaman dan                     between its level of borrowing and equity position
          posisi ekuitas untuk memastikan struktur modal               in order to ensure the optimal capital structure
          dan pengembalian yang optimal. Tidak ada                     and return. There were no changes in the
          perubahan pada pendekatan Grup dalam                         Group’s approach to capital management during
          mengelola permodalannya selama periode                       the period.
          berjalan.
Page 177
                                        PT ADARO ENERGY INDONESIA Tbk
                                   DAN ENTITAS ANAKNYA/AND ITS SUBSIDIARIES

                                                Lampiran 5/165 Schedule

CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
30 SEPTEMBER 2024 DAN 31 DESEMBER 2023                                  30 SEPTEMBER 2024 AND 31 DECEMBER 2023
(Dinyatakan dalam ribuan Dolar AS,                                               (Expressed in thousands of US Dollars,
kecuali dinyatakan lain)                                                                        unless otherwise stated)

44.   PERISTIWA SETELAH PERIODE PELAPORAN                       44.   EVENT AFTER THE REPORTING PERIOD

      Pada tanggal 24 Oktober 2024, AI mengadakan                     On 24 October 2024, AI entered into Multicurrency
      Perjanjian Fasilitas Kredit Bergulir Multivaluta                US$250,000 and Rp3,800,000,000,000 Revolving
      AS$250.000 dan Rp3.800.000.000.000 (nilai penuh)                Credit Facility Agreement (full amount) (“Syndicated
      (“Perjanjian Pinjaman Sindikasi”) dengan sindikasi              Loan Agreement”) with a syndicate of banks, for which
      bank yang di mana PT Bank Central Asia Tbk                      PT Bank Central Asia Tbk acts as the facility agent.
      bertindak sebagai agen fasilitas. AAI bertindak                 AAI acts as the guarantor of this loan facility. This loan
      sebagai penjamin atas fasilitas pinjaman ini. Fasilitas         facility will be due in 3 years from the date of the
      pinjaman akan jatuh tempo 3 tahun sejak tanggal                 Syndicated Loan Agreement. This facility bears
      Perjanjian Pinjaman Sindikasi. Fasilitas ini dikenakan          interest at SOFR plus certain percentage for loan in
      suku bunga SOFR ditambah persentase tertentu                    US Dollars and JIBOR plus certain percentage for
      untuk pinjaman dalam Dolar AS dan JIBOR ditambah                loan in Rupiah.
      persentase tertentu untuk pinjaman dalam Rupiah.


45.   OTORISASI      LAPORAN                   KEUANGAN         45.   AUTHORISATION             OF    THE    INTERIM
      KONSOLIDASIAN INTERIM                                           CONSOLIDATED           FINANCIAL STATEMENTS

      Laporan keuangan konsolidasian interim ini                      These interim consolidated financial statements were
      diotorisasi untuk diterbitkan sesuai dengan resolusi            authorised for issue in accordance with a resolution
      Direksi Perusahaan tanggal 30 Oktober 2024.                     of the Board of Directors of the Company on
                                                                      30 October 2024.
Page 178

          

File

File Open PDF
Source IDX
Size2.31 MB
Published30 Oct 2024
Pages178
Characters1,139,543
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 133 people and organisations named in the text · linked when the evidence is strong

linked org ADARO ENERGY INDONESIA Tbk p.4 ×213
linked person Garibaldi Thohir p.14 ×11
linked person Christian Ariano p.14 ×4
linked person Edwin Soeryadjaya p.14 ×2
linked person Theodore Permadi p.14 ×2
linked person Arini Saraswaty Subianto p.14 ×2
linked person Julius Aslan p.14 ×2
linked person Iwan Dewono Budiyuwono p.14
linked person Chia Ah Hoo p.15
linked org PT Alam Tri Abadi p.15 ×3
linked org PT Adaro Indonesia p.16
linked org PT Adaro Mining p.17
linked org PT Pari Coal p.17
linked org Surya Semesta p.19
linked org Bukit Asam p.20 ×2
linked org Pelindo Multi p.22 ×2
linked org Bank Permata Tbk p.80 ×2
linked org Bank Mandiri p.80
linked org Bank Central Asia Tbk p.177 ×5
possible person Sumadi p.13
possible org Negara Republik Indonesia p.13
possible org PT Adaro Strategic Investments p.14 ×3
possible org Otoritas Jasa Keuangan p.14
possible person Budi Bowoleksono p.14 ×2
possible person Lindawati Gani p.15
possible org PT Sarana Multi p.18
possible org International Pte Ltd p.18
unresolved person Notarial Deed Notaris Sukawaty Sumadi · Notaris p.13
unresolved org Minister of Justice p.13
unresolved person Humberg Lie · Notaris p.13 ×4
unresolved org Minister of Law and Human p.13
unresolved org Menteri Hukum dan Hak Asasi Manusia p.13
unresolved person Crescento p.14
unresolved person Michael W.P. p.14
unresolved person Mahendra Adinegara p.15
unresolved person Adinegara p.15
unresolved person Boards · Komisaris p.15
unresolved org PT Adaro Andalan p.15
unresolved org PT Saptaindra p.15
unresolved org PT Alam Tri Bangun p.15
unresolved org PT Adaro Minerals p.15
unresolved org Indonesia Tbk p.15
unresolved org PT Adaro Clean Energy p.15
unresolved org PT Adaro Power p.16
unresolved org PT Dianlia p.16
unresolved org PT Biscayne p.16
unresolved org PT Alam Tri Cakra p.16
unresolved org PT Indonesia Bulk p.16
unresolved org PT Adaro Persada p.16
unresolved org Singapore Pte Ltd p.16 ×2
unresolved org PT Viscaya p.16
unresolved org PT Sarana Daya p.16
unresolved org PT Adaro Logistics p.16
unresolved org PT Maritim Barito p.16
unresolved org PT Makmur p.16
unresolved org PT Puradika Bongkar p.16
unresolved org PT Rehabilitasi p.16
unresolved org PT Indonesia Multi p.17
unresolved org PT Mustika Indah p.17
unresolved org PT Bukit Enim p.17
unresolved org PT Adaro Jasabara p.17
unresolved org PT Adaro Tirta p.17 ×6
unresolved org PT Agri Multi Lestari p.17
unresolved org PT Paramitha Cipta p.17
unresolved org PT Semesta p.17
unresolved org PT Laskar Semesta p.17
unresolved org PT Drupadi Tirta p.17
unresolved org PT Lahai Coal p.17
unresolved org PT Juloi Coal p.17
unresolved org PT Sumber Barito p.17
unresolved org PT Kalteng Coal p.17
unresolved org PT Maruwai Coal p.17
unresolved org PT Ratah Coal p.17
unresolved org PT Batuan Anugerah p.17
unresolved org PT Alam Sukses Lestari p.17
unresolved org PT Barito Galangan p.17
unresolved org PT Hutan Amanah p.18
unresolved org PT Adaro Wamco p.18
unresolved org Adaro Australia Pty Ltd p.18
unresolved org PT Alam Tri Daya p.18
unresolved org PT Sarana Mekar p.18
unresolved org PT Adaro Indo p.18
unresolved org PT Batam Surya p.18
unresolved org PT Batam Sarana p.18
unresolved org PT Karimun Sarana p.18
unresolved org PT Persada Wana p.18
unresolved org PT Cakra Wana p.18
unresolved org PT Mandiri Wana p.18
unresolved org PT Kalimantan p.18
unresolved org PT Kaltara Power p.18
unresolved org PT Kalimantan Energi p.18
unresolved org PT Pembangkit p.18 ×6
unresolved org PT Balangan Anugerah Semesta p.18 ×2
unresolved org PT Mentarang Tirta p.19
unresolved org PT Adaro Baterai p.19
unresolved org PT Karimun Industri p.19
unresolved org PT Adaro Sarana Energi p.19
unresolved org PT Indoprima Niaga p.19
unresolved org PT Indotama Semesta p.19
unresolved org PT Indovisi Sentosa p.19
unresolved org PT Mitra Rimba p.19
unresolved org PT Indo Mitra p.19
unresolved org PT Adaro Wind p.19
unresolved org PT Jaringan Interkoneksi p.19 ×2
unresolved org PT Koridor Anugerah p.19
unresolved org PT Harapan Insani p.19
unresolved org PT Basalt Sinar Lestari p.19
unresolved org PT Bumi Alam Seraya p.19
unresolved org PT Adaro Jasa Tirta p.19
unresolved org Batubara Bukit Asam (Persero) Tbk p.20
unresolved org PT Tambang Batubara Bukit Asam (Persero) p.20
unresolved org Menteri Pertambangan dan Energi p.20
unresolved org Minister of Mines p.20
unresolved org Minister of Menteri Investasi p.21
unresolved org Koordinasi p.21
unresolved org Menteri Energi dan Sumber Daya p.21
unresolved org Minister of Energy Mineral p.21
unresolved org PT Pelabuhan Indonesia III (Persero) p.21
unresolved org PT Pelindo Multi Terminal p.22
unresolved org PT Terminal Curah Utama p.22
unresolved org PT Ambang p.22
unresolved org PT Ambang Barito Barito p.22
unresolved org Kementerian Energi dan Sumber Daya Mineral p.23
unresolved org Ministry of Energy and Mineral Resources p.23
unresolved org Menteri Energi dan Sumber Daya Mineral p.24
unresolved org Menteri ESDM p.24
unresolved org Minister of Energy and Mineral Resources p.24
unresolved org Minister of EMR p.24
unresolved org Bank Indonesia p.33 ×2
unresolved org Permata Tbk p.80
unresolved person KHN p.92
unresolved org Menteri Lingkungan Hidup p.150
unresolved org Menteri p.150 ×13

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 4

inlineXBRL.zip done
FinancialStatement-2024-III-ADRO.xlsx done
↑↓ select ↵ open ⇧↵ see every result