Skip to content
Back to announcement

20240722_RMKE_Tanggapan atas Permintaan Penjelasan Bursa_31686486_lamp1.pdf

Other Text extracted RMKE

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 1

Page 1
No       Name of Customer              Number of agreement             Date of Agreement   Start DateDue Date                                                                    Summary of Contract
                                                                                                     Kewajiban pengembalian Ketentuan                     : a. Pemuatan batubara akan diprioritaskan menggunakan Barge Loading Conveyor 2 atau Manual Barge
     1   PT Gorby Putra Utama          03.128/SPJB/RMKN-GPU/XII/2023           18/12/2023 18/12/2023        DP lunas                                        Loading
                                                                                                                                                            b. Pemuatan dilaksanakan dalam jangka waktu maksimal 3 (tiga) hari setelah tanggal Tongkang
                                                                                                                                                            merapat/sandar di Dermaga Pelabuhan Muat
                                                                                                                                                            c. Tempat penyerahan batubara adalah di atas Tongkang di pelabuhan muat Jetty Sriwijaya Bara
                                                                                                                                                            Logistic atau di Dermaga/Jetty yang telah ditentukan sesuai kesepakatan bersama

                                                                                                                                                            d. Waktu muat maksimal 2 x 24 jam sejak tongkang sandar jika lebih dari 2 x 24 jam maka
                                                                                                                                                            Penjual akan dikenakan biaya keterlambatan (demmurage) sesuai dengan kesepakatan

                                                                                                                                                            e. Penjual akan dikenakan sanksi menanggung seluruh biaya Dead Freight tongkang apabila
                                                                                                                                                            tidak mampu memenuhi jumlah minimum batubara yang telah ditetapkan sebelumnya.
                                                                                                                                Jumlah batubara           : 600.000 MT dengan pengiriman setiap bulan sebanyak 50.000 MT
                                                                                                                                Ketentuan pembayaran      : a. RMKN membayarkan dp sebesar Rp 39.000.000.000 ditambah PPN yang akan dibayarkan
                                                                                                                                                            maksimal 5 hari sejak penandatangan perjanjian ini
                                                                                                                                                            b. Pengembalian dp akan langsung dipotong dari hasil penjualan sebesar Rp 65.000/MT hingga
                                                                                                                                                            lunas
                                                                                                                                Masa berlaku perjanjian   : Sampai dengan seluruh kewajiban pengembalian down payment lunas
     2   PT Banyan Koalindo Lestari    03.127/SPJB/RMKN-BKL/XII/2023           12/12/2023 12/12/2023     Total volume sebesar   Jumlah batubara           : 75.000 MT
                                                                                                        75.000 MT ±25% telah    Skema pembayaran          : a. Termin 1 50%
                                                                                                        diterima di ISP Km 62                               b. Termin 2 40%
                                                                                                             milik Penjual
                                                                                                                                                            c. Termin 3 10%
     3   PT Bara Manunggal Sakti       03.38/SPJB/RMKN-BKL/III/2023            30/03/2023 30/03/2023  Saat seluruh batubara Kuantitas                     : 1 x 8.000 MT +/-10%
                                                                                                       crushed diserahkan    Harga satuan                 : Rp 860.000/MT FOB Tongkang (excl VAT dan incl WHT 22)
                                                                                                     kepada PEMBELI di atas Sistem pembayaran               Pembayaran uang muka sebesar Rp 5.475.000.000 , sisanya akan dibayar 7 hari setelah
                                                                                                     tongkang oleh PEMBELI                                : batubara selesai dimuat di atas tongkang.
     4   PT Bara Trade Internasional   03.51/SPJB/RMKN-BTI/V/2023              03/05/2023 03/05/2023 Saat seluruh batubara Kuantitas                      : 1 x 8.000 MT +/-10%
                                                                                                       crushed diserahkan    Harga satuan                 : Rp 585.000/MT FOB Tongkang (excl VAT dan incl WHT 22)
                                                                                                     kepada PEMBELI di atas Sistem pembayaran               Pembayaran uang muka sebesar Rp 2.500.000.000 , sisanya akan dibayar 7 hari setelah
                                                                                                     tongkang oleh PEMBELI                                : batubara selesai dimuat di atas tongkang.
     5   PT Mustika Indah Permai       MIP-RMKMPS3/2023/CSA                    26/02/2024 20/06/2023              31/07/2024 Kuantitas                    : 100.000 MT
                                       (kontrak payung)                                                                      Sistem pembayaran            : 1. dp 90%
                                                                                                                                                            2. 10% sisanya dibayar setelah dokumen lengkap.

File

File Open PDF
Source IDX
Size0.02 MB
Published22 Jul 2024
Pages1
Characters6,787
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 5 people and organisations named in the text · linked when the evidence is strong

unresolved org PT Gorby Putra Utama p.1
unresolved org PT Banyan Koalindo Lestari p.1
unresolved org PT Bara Manunggal Sakti p.1
unresolved org PT Bara Trade Internasional p.1
unresolved org PT Mustika Indah Permai p.1

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result