Skip to content
Back to announcement

20240711_BALI_Laporan Penggunaan Dana Hasil Penawaran Umum_31682901_lamp2.pdf

Other Text extracted BALI

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 196

Page 1

          
Page 2

          
Page 3

          
Page 4
                                                                                                    Page 1
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        ASIA TELCO NETWORKS, PT , Pembelian Panel
                                                                        Box KWH & CCTV L 400MM W 250MM H
  1       5-Oct-23              MANDIRI IDR             1220011559559   500MM Sebanyak 300 Unit                                 429,570,000   387,000,000     42,570,000                 -          429,570,000
                                                                        COMMUNICATION CABLE SYSTEMS INDONESIA,
                                                                        PT , DP 10% atas Pengadaan Cable Optical SM
                                                                        ADSS 24 Core sebanyak 100.000Mtr, Cable
                                                                        Optical SM ADSS 32 Core sebanyak 20.000Mtr,
                                                                        Cable Optical SM ADSS 96 Core sebanyak
  2       5-Oct-23              MANDIRI IDR             1220011559559   40.000Mtr                                               164,760,000   164,760,000              -                 -          164,760,000
                                                                        COMMUNICATION CABLE SYSTEMS INDONESIA,
                                                                        PT , DP 10% atas Pengadaan Cable Optical SM
                                                                        ADSS 24 Core sebanyak 100.000Mtr, Cable
                                                                        Optical SM ADSS 32 Core sebanyak 20.000Mtr,
                                                                        Cable Optical SM ADSS 96 Core sebanyak
  3       5-Oct-23              MANDIRI IDR             1220011559559   40.000Mtr - PPN                                          18,123,600             -     18,123,600                 -           18,123,600
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
  4       6-Oct-23              MANDIRI IDR             1220011559559   112.000 Mtr                                             261,072,000   235,200,000     25,872,000                 -          261,072,000
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord FC/UPC-LC/UPC SM Duplex 5 Mtr
  5       10-Oct-23             MANDIRI IDR             1220011559559   Sebanyak 100 Pcs                                          2,442,000     2,200,000       242,000                  -            2,442,000
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord FC/UPC-FC/UPC SM Duplex 3 Mtr
  6       10-Oct-23             MANDIRI IDR             1220011559559   Sebanyak 50 Pcs                                           1,415,250     1,275,000       140,250                  -            1,415,250
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord FC/UPC-LC/UPC SM Duplex 5 Mtr
                                                                        Sebanyak 100 Pcs, Patchcord FC/UPC-LC/UPC
  7       10-Oct-23             MANDIRI IDR             1220011559559   SM Duplex 2 Mtr Sebanyak 120 Pcs                          5,505,600     4,960,000       545,600                  -            5,505,600
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 8 Core SC/UPC With Adaptor With
  8       10-Oct-23             MANDIRI IDR             1220011559559   Pigtail Sebanyak 25 Pcs                                   2,497,500     2,250,000       247,500                  -            2,497,500
                                                                        DIAN MUSTIKA AGUNG, PT , Pembelian C-
                                                                        Clamp 6MM Fort Sebanyak 192.100 Pcs untuk
                                                                        Kebutuhan IKR Q3 2023 untuk 10712 Home
  9       10-Oct-23             MANDIRI IDR             1220011559559   Connect                                                  14,926,170    13,447,000      1,479,170                 -           14,926,170
                                                                        DIAN MUSTIKA AGUNG, PT , Pembelian Schoen
                                                                        BC Aluminium Insulated Pin 10mm Black
 10       10-Oct-23             MANDIRI IDR             1220011559559   Sebanyak 2.000 Pcs                                          999,000         900,000         99,000               -             999,000
                                                                        BERCA HARDAYAPERKASA, PT , Pembelian
                                                                        Switch EX2300-24P Juniper Sebanyak 2 Unit,
                                                                        Warranty Juniper PAR-RTF-EX2300 24P
 11       11-Oct-23             MANDIRI IDR             1220011559559   Sebanyak 2 LUMP SUM,dll                                  49,058,534    44,246,200      4,867,082              54,748         49,058,534
                                                                        MITRA MEDIA SELARAS, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Udara di
 12       11-Oct-23             MANDIRI IDR             1220011559559   Taman Ayodia Diskominfo DKI                               3,328,990     3,047,130       335,184               53,324          3,328,990
                                                                        MITRA MEDIA SELARAS, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Udara di PT
                                                                        Telemedia Dinamika Sarana - Taspen to Cyber
 13       11-Oct-23             MANDIRI IDR             1220011559559   APJII                                                       914,641         837,200         92,092            14,651           914,641
                                                                        MITRA MEDIA SELARAS, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Udara di
                                                                        Kementrian Dalam Negeri - Rumah Dinas
 14       11-Oct-23             MANDIRI IDR             1220011559559   Menteri Widya Chandra                                     1,400,148     1,281,600       140,976               22,428          1,400,148
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final di
 15       11-Oct-23             MANDIRI IDR             1220011559559   Taman Bhineka Tunggal Ika Diskominfo                     17,620,336    16,128,454      1,774,129          282,247            17,620,336
Page 5
                                                                                                    Page 2
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
 16       11-Oct-23             MANDIRI IDR             1220011559559   Udara Final Kab.Purwakarta - Pertigaan Telkom               497,169         458,854         50,474            12,159           497,169
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Pintu Barat Taman
 17       11-Oct-23             MANDIRI IDR             1220011559559   Air Mancur Sribaduga 1                                      720,196         664,694         73,116            17,614           720,196

                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
 18       11-Oct-23             MANDIRI IDR             1220011559559   Udara Final Kab.Purwakarta - Pertigaan BTN                  667,142         615,728         67,730            16,316           667,142
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Pertigaan Patung
 19       11-Oct-23             MANDIRI IDR             1220011559559   Egrang                                                      499,297         460,818         50,690            12,211           499,297
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Perempatan
 20       11-Oct-23             MANDIRI IDR             1220011559559   Patung Sudirman                                             504,768         465,868         51,245            12,345           504,768
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Pertigaan Disduk
 21       11-Oct-23             MANDIRI IDR             1220011559559   Umama                                                       761,092         702,438         77,268            18,614           761,092

                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
 22       11-Oct-23             MANDIRI IDR             1220011559559   Udara Final Kab.Purwakarta - Halte Usman                    658,170         607,448         66,819            16,097           658,170
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Gerbang Maya
 23       11-Oct-23             MANDIRI IDR             1220011559559   Datar Timur                                                 514,771         475,100         52,261            12,590           514,771
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Pintu Barat Taman
 24       11-Oct-23             MANDIRI IDR             1220011559559   Air Mancur Sribaduga 2                                    1,020,044         941,434     103,558               24,948          1,020,044
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Perempatan
 25       11-Oct-23             MANDIRI IDR             1220011559559   Pemda                                                       761,959         703,238         77,356            18,635           761,959
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Taman
 26       11-Oct-23             MANDIRI IDR             1220011559559   Pesanggrahan                                              1,425,956    1,316,064        144,767               34,875          1,425,956
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Pertigaan
 27       11-Oct-23             MANDIRI IDR             1220011559559   Gentong                                                     635,185         586,234         64,486            15,535           635,185
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Gapura Pemda
 28       11-Oct-23             MANDIRI IDR             1220011559559                                                               377,973         348,844         38,373             9,244           377,973
                                                                        BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kab.Purwakarta - Tikungan BKPSDM
 29       11-Oct-23             MANDIRI IDR             1220011559559                                                               395,584         365,098         40,161             9,675           395,584
Page 6
                                                                                                     Page 3
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                           NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - DLH Wahidin (Arah Pilang)
 30       11-Oct-23             MANDIRI IDR             1220011559559                                                             2,646,752    2,442,780     268,705               64,733          2,646,752
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - Cangkol (Arah Ariodinoto)
 31       11-Oct-23             MANDIRI IDR             1220011559559                                                             4,357,751    4,021,920     442,411           106,580             4,357,751
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - Ade Irma (Arah Yos Sudarso)
 32       11-Oct-23             MANDIRI IDR             1220011559559                                                             4,067,741    3,754,260     412,968               99,487          4,067,741
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - KS Tubun (Arah Ke Taman)
 33       11-Oct-23             MANDIRI IDR             1220011559559                                                             2,424,418    2,237,580     246,133               59,295          2,424,418
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - Kesambi (Arah Persimpangan)
 34       11-Oct-23             MANDIRI IDR             1220011559559                                                             3,328,577    3,072,060     337,926               81,409          3,328,577
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - Tuparev-Cipto (Arah
 35       11-Oct-23             MANDIRI IDR             1220011559559   Persimpangan)                                             6,167,824    5,692,500     626,175           150,851             6,167,824

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 36       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Jl.Cipto (Arah Gunung Sari)                4,156,284    3,835,980     421,957           101,653             4,156,284
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 37       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Siliwangi (Arah Stasiun)                   3,883,242    3,583,980     394,237               94,975          3,883,242

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 38       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Depan Kecamatan Kesenden                   3,698,939    3,413,880     375,526               90,467          3,698,939
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 39       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Siliwangi (Arah Veteran)                   3,693,088    3,408,480     374,932               90,324          3,693,088

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 40       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Simpang Krucuk (Arah Siliwangi)            2,852,704    2,632,860     289,614               69,770          2,852,704

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 41       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Jl Gudang (Arah Persimpangan)              3,203,562    2,956,680     325,234               78,352          3,203,562
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - Pengganti Kesenden 001 (Arah
 42       11-Oct-23             MANDIRI IDR             1220011559559   Taman)                                                    3,169,432    2,925,180     321,769               77,517          3,169,432

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 43       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Pagongan (Arah Persimpangan)               5,168,880    4,770,540     524,759           126,419             5,168,880

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 44       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - Lawanggada (Arah Paluseran)                2,881,763    2,659,680     292,564               70,481          2,881,763
Page 7
                                                                                                    Page 4
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 45       11-Oct-23             MANDIRI IDR             1220011559559   Kota Cirebon - BAT (Arah Pasuketan)                       2,992,345    2,761,740        303,791               73,186          2,992,345
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Kabel
                                                                        Landai site Diskominfo AP RW02, Marunda,
 46       11-Oct-23             MANDIRI IDR             1220011559559   Cilincing, Jak-Ut                                         3,243,903    3,031,685        333,485           121,267             3,243,903
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Kabel
                                                                        Landai Pademangan, Ancol, Jak-Ut site Ancol-
 47       11-Oct-23             MANDIRI IDR             1220011559559   003                                                       3,525,099    3,294,485        362,393           131,779             3,525,099

                                                                        CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                        atas Paket Pekerjaan Pengadaan Sertifikat Laik
 48       11-Oct-23             MANDIRI IDR             1220011559559   Operasi (SLO) - Perempatan Pemda                            238,438         218,750         24,063             4,375           238,438
                                                                        CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                        atas Paket Pekerjaan Pengadaan Sertifikat Laik
 49       11-Oct-23             MANDIRI IDR             1220011559559   Operasi (SLO) - Jl. Tambong                                 238,438         218,750         24,063             4,375           238,438
                                                                        CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                        atas Paket Pekerjaan Pengadaan Sertifikat Laik
                                                                        Operasi (SLO) - 30 Site Diskominfo Kota
 50       11-Oct-23             MANDIRI IDR             1220011559559   Bandung                                                   7,153,125    6,562,500        721,875           131,250             7,153,125
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Hit By
                                                                        Truck site Diskominfo AP RW08, Kedaung
 51       11-Oct-23             MANDIRI IDR             1220011559559   Kaliangke, Cengkareng, Jak-Bar                            1,171,927    1,266,948               -              95,021          1,171,927
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
 52       11-Oct-23             MANDIRI IDR             1220011559559   Relokasi Kabel FO Rumah Pompa UPP                         1,102,367    1,191,748               -              89,381          1,102,367
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        Penebangan Pohon site Diskominfo AP RW10,
 53       11-Oct-23             MANDIRI IDR             1220011559559   Cengkareng Barat, Jak-Bar                                 1,672,167    1,807,748               -          135,581             1,672,167
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Jalur Kabel Ducting Impact
                                                                        Pembangunan Dog Park di Summarecon Mall
 54       11-Oct-23             MANDIRI IDR             1220011559559   Serpong                                                  14,491,926   15,666,947               -         1,175,021           14,491,926
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Pemutusan oleh Dinas
                                                                        Binamarga di PT Krakatau Wajatama Osaka
 55       11-Oct-23             MANDIRI IDR             1220011559559   Steel                                                     2,106,546    2,277,347               -          170,801             2,106,546

                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Kabel
                                                                        Tertabrak Truck site Diskominfo AP RW01,
 56       11-Oct-23             MANDIRI IDR             1220011559559   Kedaung Kaliangke, Cengkareng, Jak-Bar                    1,698,806    1,836,547               -          137,741             1,698,806
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        Pemindahan Tiang Permintaan Warga site
 57       11-Oct-23             MANDIRI IDR             1220011559559   Diskominfo AP RW01, Makasar Jak-Tim                       2,537,966    2,743,747               -          205,781             2,537,966
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        Relokasi Kabel Udara site Diskominfo AP RW03,
 58       11-Oct-23             MANDIRI IDR             1220011559559   Klender, Duren Sawit, Jak-Tim                             1,055,007    1,140,548               -              85,541          1,055,007
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        Progres Pembersihan Oleh Dinas PPSU Jakbar
 59       11-Oct-23             MANDIRI IDR             1220011559559   site Rumah Pompa RW03, Kalideres                          3,014,527    3,258,948               -          244,421             3,014,527
Page 8
                                                                                                    Page 5
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                            NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Pemasangan Tiang FO 9 Mtr site
                                                                        Diskominfo AP RW04, Pondok Bambu, Duren
 60       11-Oct-23             MANDIRI IDR             1220011559559   Sawit, Jak-Tim                                            3,473,765     3,246,509     357,116           129,860             3,473,765
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Impact Kabel
                                                                        Landai site Diskominfo AP RW04, Cipete Utara,
 61       11-Oct-23             MANDIRI IDR             1220011559559   Kebayoran Baru, Jak-Sel                                   2,371,853     2,216,685     243,835               88,667          2,371,853
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Impact Kabel
                                                                        Landai site Diskominfo AP RW06, Duri Kosambi,
 62       11-Oct-23             MANDIRI IDR             1220011559559   Cengkareng, Jak-Bar                                       2,380,413     2,224,685     244,715               88,987          2,380,413
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Impact Kabel
                                                                        Landai Dishub Jl. Wolter Monginsidi - Jl.
 63       11-Oct-23             MANDIRI IDR             1220011559559   Wijaya1 Jl. Suryo (Santa)                                 2,882,243     2,693,685     296,305           107,747             2,882,243

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan kabel FO Cut Impact Kabel
 64       11-Oct-23             MANDIRI IDR             1220011559559   Landai site Diskominfo AP RW18, Koja, Jakut               2,494,903     2,331,685     256,485               93,267          2,494,903
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Hit by
                                                                        Truck site Diskominfo AP RW05, Papango,
 65       11-Oct-23             MANDIRI IDR             1220011559559   Tanjung Priok, Jak-Ut                                     3,182,913     2,974,685     327,215           118,987             3,182,913
                                                                        DANANG DWI YUNAWANTO , Pekerjaan
                                                                        Penambahan Akses Point Customer Living
                                                                        World Denpasar.(PO Rp.2.142.000,- Potongan
 66       12-Oct-23             SINARMAS IDR              2999994       PPh 21(3%) Rp.64.260,- )                                  2,077,740     2,142,000          -                64,260          2,077,740
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 67       13-Oct-23             MANDIRI IDR             1220011559559   84.000 Mtr                                              195,804,000   176,400,000   19,404,000                 -          195,804,000
                                                                        DIRGA BAHARI PERKASA, PT , DP 30% atas
                                                                        Pengadaan CCTV DS-2CT4051G0-1 Hikvision
 68       16-Oct-23             MANDIRI IDR             1220011559559   sebanyak 1.000 Unit                                     324,172,200   324,172,200                              -          324,172,200
                                                                        DIRGA BAHARI PERKASA, PT , DP 30% atas
                                                                        Pengadaan CCTV DS-2CT4051G0-1 Hikvision
 69       16-Oct-23             MANDIRI IDR             1220011559559   sebanyak 1.000 Unit - PPN                                35,658,942           -     35,658,942                 -           35,658,942
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT GPON 1GE
                                                                        SC/APC untuk Kebutuhan IKR Q2 Batch 2
 70       16-Oct-23             MANDIRI IDR             1220011559559   sebanyak 4.722 Pcs - PPN                                 18,307,269           -     18,307,269                 -           18,307,269
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT GPON 1GE
                                                                        SC/APC untuk Kebutuhan IKR Q2 Batch 2
 71       16-Oct-23             MANDIRI IDR             1220011559559   sebanyak 4.722 Pcs                                      166,429,723   166,429,723          -                   -          166,429,723

                                                                        TELCO ABADI JAYA, PT , Pembelian Cable
                                                                        Network STP Cat-6 9.150 MTR, Cable Network
 72       16-Oct-23             MANDIRI IDR             1220011559559   STP Cat-5E 12.200 MTR untuk Kebutuhan Q3                258,550,635   232,928,500   25,622,135                 -          258,550,635
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Hagane Rack Wallmount 19 4U Depth 450mm
 73       16-Oct-23               BCA IDR                3193058058     Single Glass Door Sebanyak 5 Unit                         7,631,250     6,875,000     756,250                  -            7,631,250
                                                                        MANNA ABADI SEJAHTERA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Tanam Final
 74       17-Oct-23             MANDIRI IDR             1220011559559   Jakarta Selatan - Relokasi Jl.Puri Kencana               97,165,748    88,938,900    9,783,279         1,556,431           97,165,748
Page 9
                                                                                                    Page 6
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK     DPP            PPN              PPh             NET DIBAYARKAN
                                                                        TANGGUH SINERGI KOORPORASI, PT ,
                                                                        Settlement Biaya Pembelian IP V4/22 PT.
                                                                        Tangguh Sinergy Corporation - PR: 1010034764 -
 75       19-Oct-23             MANDIRI IDR             1220011559559   PO : 1010038282 - Trf                                   334,630,000    279,370,000     67,540,000       12,280,000          334,630,000

                                                                        BANGUN KELOLA SWADAYA, PT , Pelunasan
                                                                        70% Penarikan Kabel FTTH cluster Jatirahayu
                                                                        RW013(438HP),Kt.Baru RW008
                                                                        (168HP),Jatibening Baru RW003
                                                                        (504HP),Jatibening RW009 (294HP),Jatiluhur
                                                                        RW003(294HP),Bintara RW002(170HP),Kebon
                                                                        Kosong RW003(224HP)RW007
 76       19-Oct-23             MANDIRI IDR             1220011559559   (294HP)&RW008 (112HP)                                   495,076,363    456,923,270     50,261,560       12,108,467          495,076,363
                                                                        TOKOPEDIA, PT , Biaya Pembelian ONT
 77       19-Oct-23             MANDIRI IDR             1220011559559   EG8145V5 HUAWEI Kebutuhan Tim IKR                         4,801,800      4,801,800            -                  -            4,801,800
                                                                        TOKOPEDIA, PT , Biaya Pembelian Gainward
 78       19-Oct-23             MANDIRI IDR             1220011559559   Phoenix sebanyak 1 unit                                   7,594,621      7,594,621            -                  -            7,594,621
                                                                        TOKOPEDIA, PT , Biaya Pembelian VGA MSI
 79       19-Oct-23             MANDIRI IDR             1220011559559   GeForce RTX 4060                                          8,413,200      8,413,200            -                  -            8,413,200
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 51 di Apartement Green
 80       23-Oct-23             MANDIRI IDR             1220011559559   Pramuka                                                   4,116,000      4,200,000            -               84,000          4,116,000
                                                                        INDOKARYA SUKSES BERSAMA, PT , Biaya
                                                                        Supervisi Batch 6 sebanyak 9 SO di Apartement
 81       23-Oct-23             MANDIRI IDR             1220011559559   Paradise Mansion                                          1,350,003      1,500,003            -           150,000             1,350,003
                                                                        ASIA TEKNOLOGI SOLUSI, PT , Biaya Instalasi
                                                                        dan Kelebihan Kabel Sewa Local Loop 50 Mbps
                                                                        PT Asia Teknologi Solusi untuk Tenant PT Seven
 82       23-Oct-23             MANDIRI IDR             1220011559559   Morning - site PIK to Cyber 1                             1,776,700      1,630,000       179,300              32,600          1,776,700
                                                                        FANAH JAYA MAINDO, PT , Pembelian
 83       23-Oct-23             MANDIRI IDR             1220011559559   Connector RJ45 Cat 5 Sebanyak 6.901 Pcs                  16,086,231     14,492,100      1,594,131                -           16,086,231
                                                                        EDI SLAMET , pekerjaan pemasangan lampu PJU
                                                                        (5 titik tiang FO Gang Merak) Site BLL_04
                                                                        Penarukan(PO Rp.3.870.760,- Potongan PPh
 84       23-Oct-23             SINARMAS IDR             0002999994     21(2.5%) Rp.96.769,-)                                     3,773,991      3,870,760            -               96,769          3,773,991

                                                                        PPRS APARTEMENT PERMATA EKSEKUTIF ,
                                                                        Biaya Jasa Penarikan Kabel FO Batch 8 sebanyak
 85       25-Oct-23             MANDIRI IDR             1220011559559   10 SO Apartement Permata Eksekutif                        2,999,997      3,333,330            -           333,333             2,999,997
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 52 di Apartement Green
 86       25-Oct-23             MANDIRI IDR             1220011559559   Pramuka                                                   4,116,000      4,200,000            -               84,000          4,116,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 87       26-Oct-23             MANDIRI IDR             1220011559559   120.000 Mtr                                             279,720,000    252,000,000     27,720,000                -          279,720,000
                                                                        CIPTAKOM MEDIA NUSA, PT , Biaya Instalasi
                                                                        dan Biaya Perangkat ONT untuk kebutuhan
                                                                        Tenant PT China Huadian Hongkong di Gedung
 88       26-Oct-23             MANDIRI IDR             1220011559559   DBS Tower LT.23                                           3,567,500      3,250,000       357,500              40,000          3,567,500
                                                                        INOVASI SISTEM TEKNOLOGI, PT , Uang Muka
                                                                        Beban Umum atas DP 30% untuk pembelian
                                                                        perangkat NGAF 5500 kebutuhan Universitas
 89       27-Oct-23             MANDIRI IDR             1220011559559   Bakrie - PR : 1010038395 - Trf                          252,094,110    252,094,110            -                  -          252,094,110
                                                                        BERCA HARDAYAPERKASA, PT , Tagihan
                                                                        Pelunasan 70% atas Pengadaan Server Inspur
                                                                        NMS NSP - NF5280M6, NF5180M6, NF5266M6
 90       27-Oct-23             MANDIRI IDR             1220011559559   dan Installation Server NMS NSP                       2,894,203,068   2,630,040,000   289,304,400       25,141,332        2,894,203,068
Page 10
                                                                                                    Page 7
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                           NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        DJAJA LISTRIK, PT , Pembelian Power Plug Type
 91       1-Nov-23              MANDIRI IDR             1220011559559   C Sebanyak 200 Unit                                       2,109,000    1,900,000     209,000                  -            2,109,000
                                                                        LINK NET TBK, PT , Tangihan 100% atas
                                                                        Pengadaan NVR 24 Channel DHI-IVSS7108-2M
 92       1-Nov-23              MANDIRI IDR             1220011559559   DAHUA sebanyak 1 Unit                                    99,567,000   89,700,000    9,867,000                 -           99,567,000

                                                                        DANANG DWI YUNAWANTO , Pekerjaan
                                                                        Activation For New Service Corporate Delivery
                                                                        818529 Cozy Sunsrise Villa Ungasan(PO
 93       3-Nov-23              SINARMAS IDR             0002999994     Rp.2.456.400,- Potongan PPh 21(3%) Rp.73.692              2,382,708    2,456,400                           73,692          2,382,708
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang FDT Impact
                                                                        FDT/FAT tidak bisa Terbuka Pintunya Terhalang
 94       3-Nov-23              MANDIRI IDR             1220011559559   Tiang ISP Lain site Jatiasih-001                          1,701,767    1,839,748          -            137,981             1,701,767
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Relokasi Penertiban
                                                                        Kabel Udara ke Kabel Bawah Tanah site MP
 95       3-Nov-23              MANDIRI IDR             1220011559559   Rawa Barat-001                                            2,372,946    2,565,347          -            192,401             2,372,946
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak
 96       3-Nov-23              MANDIRI IDR             1220011559559   Kendaraan Besar site MP Pejagalan-001                     1,395,407    1,508,548          -            113,141             1,395,407
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Tarik Mundur Kabel Impact
 97       3-Nov-23              MANDIRI IDR             1220011559559   Pemutusan Oleh DBM site MP Cibubur-001                    1,752,087    1,894,148          -            142,061             1,752,087
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak
 98       3-Nov-23              MANDIRI IDR             1220011559559   Kendaraan Besar site MP Duren Tiga-002                    1,422,046    1,537,347          -            115,301             1,422,046
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak
                                                                        Kendaraan Besar dan JC Existing Broken site MP
 99       3-Nov-23              MANDIRI IDR             1220011559559   Duren Tiga-002                                            1,533,787    1,658,148          -            124,361             1,533,787
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak Truck
 100      3-Nov-23              MANDIRI IDR             1220011559559   site Lebak Bulus-016                                      1,613,706    1,744,547          -            130,841             1,613,706
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Progress Migrasi Kabel FO Rusunawa
 101      3-Nov-23              MANDIRI IDR             1220011559559   Cengkareng site Kapuk-052                                 2,202,007    2,380,548          -            178,541             2,202,007
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Impact Relokasi
 102      3-Nov-23              MANDIRI IDR             1220011559559   Tiang Permintaan Warga site Johar Baru-007                1,988,886    2,150,147          -            161,261             1,988,886
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Impact Relokasi
                                                                        Tiang Permintaan Warga site Diskominfo AP
 103      3-Nov-23              MANDIRI IDR             1220011559559   RW10, Klender, Duren Sawit, Jak-Tim                       2,180,546    2,357,347          -            176,801             2,180,546
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        Tertabrak Truck site Diskominfo AP RW07,
 104      3-Nov-23              MANDIRI IDR             1220011559559   Cakung Timur, Jak-tim                                     1,155,647    1,249,348          -                93,701          1,155,647
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Pole Jakwifi Impact
                                                                        Tertabrak Truck site Diskominfo AP RW04,
 105      3-Nov-23              MANDIRI IDR             1220011559559   Kampung Tengah, Kramat Jati, Jak-tim                      1,520,773    1,644,078          -            123,305             1,520,773
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Box FAT Pedestal
 106      3-Nov-23              MANDIRI IDR             1220011559559   Complain Warga Permata Buana RW11                         1,259,616    1,361,747          -            102,131             1,259,616
Page 11
                                                                                                   Page 8
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Rubuh Impact Tiang
                                                                        Galvanis Patah dan Rubuh site Diskominfo AP
 107      3-Nov-23              MANDIRI IDR             1220011559559   RW05, Penggilingan, Cakung, Jak-Tim                      1,087,567    1,175,748               -              88,181          1,087,567
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Hit By Truck site MP
 108      3-Nov-23              MANDIRI IDR             1220011559559   Cilangkap-001                                            1,109,767    1,199,748               -              89,981          1,109,767

                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Sabotase Pemutusan
 109      3-Nov-23              MANDIRI IDR             1220011559559   Warga Pemilik Rumah site Cilangkap-013                   2,015,897    2,179,348               -          163,451             2,015,897
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penambahan Tiang Jl. Kemuning Raya
 110      3-Nov-23              MANDIRI IDR             1220011559559   FAT 01-08 site MP Kalideres-001                          1,333,987    1,442,148               -          108,161             1,333,987
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Kabel FO Cut Impact Kabel Tertabrak
 111      3-Nov-23              MANDIRI IDR             1220011559559   Truck site MP Penggilingan-001                           2,030,326    2,194,947               -          164,621             2,030,326
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Pembangunan Trotoar
 112      3-Nov-23              MANDIRI IDR             1220011559559   Jalan site MP Duri Kepa-001                              6,240,187    6,746,148               -          505,961             6,240,187
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Under Cluster
                                                                        Kukusan RW05 Impact Complain Warga
 113      3-Nov-23              MANDIRI IDR             1220011559559   Setempat site MP Cipedak-001                             1,772,437    1,916,148               -          143,711             1,772,437
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Impact
 114      3-Nov-23              MANDIRI IDR             1220011559559   Pembangunan Rumah site Cilangkap-010                     2,035,137    2,200,148               -          165,011             2,035,137
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang dan Repair Tiang
                                                                        Miring Wahana Pondok gede dan Tebet site MP
 115      3-Nov-23              MANDIRI IDR             1220011559559   Cilangkap-001                                            1,876,777    2,028,948               -          152,171             1,876,777
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Under site Pondok
 116      3-Nov-23              MANDIRI IDR             1220011559559   Gede Permai site Jatirasa-005                            1,462,007    1,580,548               -          118,541             1,462,007
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Kabel
 117      3-Nov-23              MANDIRI IDR             1220011559559   Terbakar Kabel PLN site Mampang-008                      1,705,467    1,843,748               -          138,281             1,705,467
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        Pemutusan oleh DBM (SJUT) site MP Bangka-
 118      3-Nov-23              MANDIRI IDR             1220011559559   001                                                      1,290,326    1,394,947               -          104,621             1,290,326
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Box FAT Pedestal Impact
                                                                        Pembangunan under FAT 02-107 Cluster Puri
 119      3-Nov-23              MANDIRI IDR             1220011559559   Indah site Kembangan Selatan-011                         1,145,380    1,238,248               -              92,868          1,145,380
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 53 di Apartement Green
 120      3-Nov-23              MANDIRI IDR             1220011559559   Pramuka                                                  4,116,000    4,200,000               -              84,000          4,116,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Cable Optical SM Drop 1 Core With Messenger
 121      3-Nov-23              MANDIRI IDR             1220011559559   Sebanyak 4.000 Mtr                                       4,884,000    4,400,000        484,000                  -            4,884,000
                                                                        SUNICODATA COMININDO, PT , Pembelian
                                                                        Switch S4600 10P SI DCN untuk Kebutuhan Q3
 122      7-Nov-23              MANDIRI IDR             1220011559559   Sebanyak 20 Unit                                        39,960,000   36,000,000       3,960,000                 -           39,960,000
                                                                        MDT TOTAL SOLUTION, PT , Pembelian
                                                                        Patchcord SM Duplex LC/UPC-LC/UPC 3MM 5M
 123      7-Nov-23              MANDIRI IDR             1220011559559   Sebanyak 24 Pcs                                            959,040         864,000         95,040               -             959,040
Page 12
                                                                                                    Page 9
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        MDT TOTAL SOLUTION, PT , Pembelian SFP
 124      7-Nov-23              MANDIRI IDR             1220011559559   Copper 1Gb 10KM Sebanyak 25 Unit                          9,018,750     8,125,000       893,750                  -            9,018,750
                                                                        MDT TOTAL SOLUTION, PT , Pembelian
                                                                        Patchcord SM Simplex SC/UPC-SC/UPC 2MM
 125      7-Nov-23              MANDIRI IDR             1220011559559   3M Sebanyak 600 Unit                                     10,656,000     9,600,000      1,056,000                 -           10,656,000
                                                                        MDT TOTAL SOLUTION, PT , Pembelian ODB
                                                                        Outdoor 24 Core SC/UPC Sebanyak 100 Unit
 126      7-Nov-23              MANDIRI IDR             1220011559559   untuk Kebutuhan Java Jazz dan GBK 2023                   44,400,000    40,000,000      4,400,000                 -           44,400,000
                                                                        MDT TOTAL SOLUTION, PT , Pembelian Joint
                                                                        Closure 24 Core untuk Kebutuhan Q2 Sebanyak
 127      7-Nov-23              MANDIRI IDR             1220011559559   30 Unit                                                   9,324,000     8,400,000       924,000                  -            9,324,000
                                                                        PLN PERSERO, PT , Biaya Penggantian
                                                                        Pembayaran atas KWH PLN 1300 VA - Site
                                                                        Terminal Pulogadung-C01 - CCTV Project yang
 128      8-Nov-23              MANDIRI IDR             1220011559559   hilang                                                      696,403         696,403          -                   -             696,403
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Terminal Block Din Rail 50 Pcs, Din Rail Power
 129      8-Nov-23                BCA IDR                3193058058     Supply AC to DC 48V 1.6A 350 Pcs                        175,629,750   158,225,000     17,404,750                 -          175,629,750
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Terminal Block Stopper Rail MCB CCTV 343
 130      8-Nov-23                BCA IDR                3193058058     Sebanyak 350 Pcs                                          1,165,500     1,050,000       115,500                  -            1,165,500
                                                                        PUTRA NEGARA, PT , Tagihan 100% atas
                                                                        Pekerjaan Geser Tiang Cluster Pucang Sewu
                                                                        RW08 Impact Pemasangan Box Culvert Project
 131      9-Nov-23              MANDIRI IDR             1220011559559   Pemkot Surabaya                                           2,561,053     2,363,685       260,005               62,637          2,561,053
                                                                        SARWA UTAMA NUSA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel FO MCP Cikole-07
 132      9-Nov-23              MANDIRI IDR             1220011559559   Sukabumi                                                  5,570,795     5,684,484            -            113,689             5,570,795
                                                                        SARWA UTAMA NUSA, PT , Tagihan 100% atas
                                                                        Pekerjaan Rectification Kabel FO site MP Daeng
 133      9-Nov-23              MANDIRI IDR             1220011559559   Cimahi                                                    2,770,739     2,827,284            -                56,545          2,770,739

                                                                        WAHANA MANDIRI, TOKO , Pembelian Tang
                                                                        Krimping RJ45 Cat 5E Sebanyak 10 Unit,
 134      9-Nov-23              MANDIRI IDR             1220011559559   Portable Optical Power Meter Sebanyak 11 Unit            31,801,500    28,650,000      3,151,500                 -           31,801,500
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 4
 135      9-Nov-23              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 1
 136      9-Nov-23              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 3
 137      9-Nov-23              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 2
 138      9-Nov-23              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
                                                                        Kab.Purwakarta Perbatasan PurwakartaSubang
 139      9-Nov-23              MANDIRI IDR             1220011559559   (Via Cibatu)                                              2,086,324     1,909,678       210,065               33,419          2,086,324
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
 140      9-Nov-23              MANDIRI IDR             1220011559559   Kab.Purwakarta Perapatan Cihideung                        2,086,324     1,909,678       210,065               33,419          2,086,324
Page 13
                                                                                                   Page 10
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK     DPP            PPN              PPh             NET DIBAYARKAN
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
                                                                        Kab.Purwakarta Perbatasan
                                                                        PurwakartaBandung (Via Pertingaan
 141      9-Nov-23              MANDIRI IDR             1220011559559   BojongSawit)                                              2,086,324      1,909,678       210,065              33,419          2,086,324
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
 142      9-Nov-23              MANDIRI IDR             1220011559559   Kab.Purwakarta Pertigaan Plered                           2,209,230      2,022,178       222,440              35,388          2,209,230
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
                                                                        Kab.Purwakarta Perbatasan
 143      9-Nov-23              MANDIRI IDR             1220011559559   PurwakartaKarawang (Via Klari)                            2,086,324      1,909,678       210,065              33,419          2,086,324
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
                                                                        Kab.Purwakarta Perbatasan
 144      9-Nov-23              MANDIRI IDR             1220011559559   PurwakartaKarawang (Via Cikopo)                           2,086,324      1,909,678       210,065              33,419          2,086,324
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
 145      9-Nov-23              MANDIRI IDR             1220011559559   Kab.Purwakarta Tikungan Cihuni                            2,086,324      1,909,678       210,065              33,419          2,086,324
                                                                        MORASHA INTI SHABIRA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final
                                                                        Kab.Purwakarta Perbatasan PurwakartaSubang
 146      9-Nov-23              MANDIRI IDR             1220011559559   (Via Garokgek)                                            2,086,324      1,909,678       210,065              33,419          2,086,324
                                                                        TOKOPEDIA, PT , Biaya Pembelian ONT Huawei
 147      13-Nov-23             MANDIRI IDR             1220011559559   50 Unit untuk keperluan Tim IKR                          23,808,000     23,808,000            -                  -           23,808,000
                                                                        WAWAN HERMAWAN , Pekerjaan
                                                                        Penyambungan Kabel FO HH Kediri Tuban
                                                                        (CCTV Pantai Kuta, Pantai Jerman).(PO
                                                                        Rp.1.314.948,- Potongan PPh 21(2.5%)
 148      14-Nov-23             SINARMAS IDR             0002999994     Rp.32.874,-)                                              1,282,074      1,314,948            -               32,874          1,282,074
                                                                        ARALIA ARTHA MANDIRI, CV , Uang Muka
                                                                        Beban Umum atas Pembayaran Pengadaan
                                                                        Material PC CCTV untuk Kebutuhan CCTV 200
 149      14-Nov-23             MANDIRI IDR             1220011559559   titik Diskominfo PO:1010039147Trf                       361,600,038    325,765,800     35,834,238                -          361,600,038

                                                                        BERCA HARDAYAPERKASA, PT , Tagihan
                                                                        Pelunasan 70% atas Pengadaan GPU Server T4
                                                                        sebanyak 19 Unit, Non GPU Server sebanyak 4
 150      14-Nov-23             MANDIRI IDR             1220011559559   Unit dan Network Server sebanyak 1 Unit               2,952,600,000   2,660,000,000   292,600,000                -        2,952,600,000
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
 151      15-Nov-23             MANDIRI IDR             1220011559559   Network UTP Cat 5E Sebanyak 13.875 Mtr                   77,006,250     69,375,000      7,631,250                -           77,006,250
                                                                        KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                        atas Pengadaan Material Bracket CCTV JPO
 152      15-Nov-23             MANDIRI IDR             1220011559559   sebanyak 1 Lot                                            6,382,500      5,750,000       632,500                 -            6,382,500
                                                                        ARALIA ARTHA MANDIRI, CV , Uang Muka
                                                                        Beban Umum atas Pembayaran Pengadaan
                                                                        Material PC CCTV untuk Kebutuhan CCTV 200
 153      15-Nov-23             MANDIRI IDR             1220011559559   titik Diskominfo PO:1010039147Trf                       361,600,038    325,765,800     35,834,238                -          361,600,038
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 154      17-Nov-23             MANDIRI IDR             1220011559559   120.000 Mtr                                             279,720,000    252,000,000     27,720,000                -          279,720,000

                                                                        PENGELOLA MASPION PLAZA GUNUNG SAHARI
                                                                        , Biaya Pekerjaan Penarikan Kabel Tenant PT
 155      17-Nov-23             MANDIRI IDR             1220011559559   Curry Boga Indonesia di Gedung Maspion                    1,515,000      1,500,000       165,000          150,000             1,515,000
Page 14
                                                                                                    Page 11
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        ALPHA CIKUPA MAKMUR, PT , Settlement
                                                                        Pembayaran Pengadaan Material Subduct HDPE
                                                                        FO Crossing Project (Bath 1) PO:1010037909
 156      17-Nov-23             MANDIRI IDR             1220011559559   Trf                                                         6,545,000             -      6,545,000                 -            6,545,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 157      17-Nov-23             MANDIRI IDR             1220011559559   10.000Mtr                                                  23,310,000   21,000,000       2,310,000                 -           23,310,000

                                                                        TOKOPEDIA, PT , Biaya Pembelian ONT HUAWEI
 158      20-Nov-23             MANDIRI IDR             1220011559559   untuk keperluan IKR Batch 5 sebanyak 100 unit              46,591,500   46,591,500               -                 -           46,591,500

                                                                        TOKOPEDIA, PT , Biaya Pembelian ONT Huawei
 159      20-Nov-23             MANDIRI IDR             1220011559559   Untuk keperluan IKR Batch 6 sebanyak 100 Unit              46,591,500   46,591,500               -                 -           46,591,500

                                                                        TOKOPEDIA, PT , Biaya Pembelian ONT Huawei
 160      20-Nov-23             MANDIRI IDR             1220011559559   sebanyak 50 unit untuk Tim IKR Batch 4                     23,808,000   23,808,000               -                 -           23,808,000
                                                                        BIBIT , Pekerjaan Relokasi Kabel FO CCTV KRBKL-
                                                                        012 (Permintaan Pihak The Pond)(PO
                                                                        Rp.1.136.868,- Potongan PPh 21(9%)
 161      21-Nov-23             SINARMAS IDR             0002999994     Rp.102.318,- )                                              1,034,550    1,136,868               -          102,318             1,034,550
                                                                        I KETUT DARTA , Pekerjaan Relokasi Kabel FO
                                                                        CCTV Seminyak-012 (lmpact Pembangunan
                                                                        Balai Banjar Basangkasa (PO Rp.2.600.388,-
 162      21-Nov-23             SINARMAS IDR             0002999994     Potongan PPh 21(2.5%) Rp.65.010,- )                         2,535,378    2,600,388               -              65,010          2,535,378
                                                                        I NENGAH SUSASTRA , Pekerjaan Penarikan
                                                                        Kabel UTP Link to 818603 PT. Niaga Aneka
                                                                        Mode (Gosh DSM) dan UTP Link to 818607
                                                                        Balikhoe DSM(PO Rp.1.522.000,- Potongan PPh
 163      21-Nov-23             SINARMAS IDR             0002999994     21(2.5%) Rp.38.050,-                                        1,483,950    1,522,000               -              38,050          1,483,950
                                                                        I NENGAH SUSASTRA , Pekerjaan Penarikan
                                                                        Kabel UTP Link to 818577 PT. Data Citra Mandiri
                                                                        (IBOX DSM Lt. 1), (IBOX DSM Lt. 2)P Link to
                                                                        818579 PT. Bali Pawiwahan (Coco Gourmet ),
                                                                        Link to 818576 PT. GlobalTeknologi Niaga (Blibli
 164      21-Nov-23             SINARMAS IDR             0002999994     DSM)                                                        2,741,700    2,812,000               -              70,300          2,741,700
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
 165      21-Nov-23             MANDIRI IDR             1220011559559   OTB Indoor 24 Core SC/APC Sebanyak 10 Set                   6,327,000    5,700,000        627,000                  -            6,327,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Tools Optical Cable Binding Machine Sebanyak
 166      21-Nov-23             MANDIRI IDR             1220011559559   1 Unit                                                      4,329,000    3,900,000        429,000                  -            4,329,000
                                                                        TELCO ABADI JAYA, PT , Pembelian Patchcord
                                                                        SM Simplex LC/UPC-SC/UPC 2MM 3M Sebanyak
 167      23-Nov-23               BCA IDR                3193058058     20 Unit                                                       406,260         366,000         40,260               -             406,260
                                                                        TELCO ABADI JAYA, PT , Pembelian Connector
                                                                        RG-45 Cat-5e 3.000 Unit untuk Kebutuhan Java
 168      23-Nov-23               BCA IDR                3193058058     Jazz dan GBK 2023                                           8,325,000    7,500,000        825,000                  -            8,325,000

                                                                        TELCO ABADI JAYA, PT , Pembelian SKUN Y
 169      23-Nov-23               BCA IDR                3193058058     4MM Sebanyak 1.000 Pcs untuk Kebutuhan Q2                     397,380         358,000         39,380               -             397,380
                                                                        TELCO ABADI JAYA, PT , Pembelian Power
                                                                        Outlet Strip 4 Port Uticon Sebanyak 50 Unit,
                                                                        Cable Network UTP Cat 6 With Connector 3M
 170      23-Nov-23               BCA IDR                3193058058     Belden Sebanyak 50 Unit                                     5,272,500    4,750,000        522,500                  -            5,272,500
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable
                                                                        Network UTP Cat-6 With Connector 3M
                                                                        Sebanyak 100 Unit untuk Kebutuhan Java Jazz
 171      23-Nov-23               BCA IDR                3193058058     dan GBK 2023                                                7,992,000    7,200,000        792,000                  -            7,992,000
Page 15
                                                                                                     Page 12
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK     DPP            PPN              PPh             NET DIBAYARKAN
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable
                                                                        Network Connector RJ-45 Cat-5E 1.000 Unit
 172      23-Nov-23               BCA IDR                3193058058     untuk Kebutuhan Stock Q3                                    2,775,000      2,500,000       275,000                 -            2,775,000
                                                                        TELCO ABADI JAYA, PT , Pembelian SFP+ Copper
 173      23-Nov-23               BCA IDR                3193058058     10 GB 30M 2 Sebanyak 2 Unit                                 2,652,900      2,390,000       262,900                 -            2,652,900
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable NYAF
                                                                        4mm black Sebanyak 1.000 MTR untuk Project
 174      23-Nov-23               BCA IDR                3193058058     MCP                                                        10,700,400      9,640,000      1,060,400                -           10,700,400
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable Power
                                                                        NYA 1.5MM Blue 300 Mtr, Cable Power NYA
 175      23-Nov-23               BCA IDR                3193058058     1.5MM Green-Yellow 300 Mtr, dll                             3,279,495      2,954,500       324,995                 -            3,279,495
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable
                                                                        Network UTP Cat 6 With Connector 3M
 176      23-Nov-23               BCA IDR                3193058058     Sebanyak 150 Unit                                          11,988,000     10,800,000      1,188,000                -           11,988,000
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Jakarta Utara Akses Site Jl. Perintis
 177      23-Nov-23             MANDIRI IDR             1220011559559   Kemerdekaan Kesbangpol                                      6,236,404      6,406,167            -           169,763             6,236,404
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Jakarta Pusat Akses Site Jl. Pangeran Jayakarta
 178      23-Nov-23             MANDIRI IDR             1220011559559   Dishub                                                      3,511,172      3,606,750            -               95,578          3,511,172
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Jakarta Utara Akses Site Monas Dishub dan
 179      23-Nov-23             MANDIRI IDR             1220011559559   Kesbangpol                                                  1,920,683      1,972,966            -               52,283          1,920,683
                                                                        TELCO ABADI JAYA, PT , Pembelian Adaptor
                                                                        Converter AC to DC 48V 3A Sebanyak 4 Unit,
                                                                        POE Injector Without Adaptor 8 Port 48V 1A
 180      23-Nov-23               BCA IDR                3193058058     Sebanyak 4 Unit                                             1,434,120      1,292,000       142,120                 -            1,434,120
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 181      24-Nov-23             MANDIRI IDR             1220011559559   84.000Mtr                                                 195,804,000    176,400,000     19,404,000                -          195,804,000
                                                                        BIBIT , Biaya Pekerjaan Perbaikan FO Cut di
                                                                        Cluster Banjar Bualu sesuai TT I1010-007 dan
                                                                        Perbaikan Tiang Miring di Cluster Balangan
                                                                        Pratama dan relokasi FO Link Distribusi Cluster
 182      27-Nov-23             SINARMAS IDR             0002999994     Bukit Hijau Prana Gading                                    2,639,661      2,900,726            -           261,065             2,639,661

                                                                        BIBIT , Biaya Perbaikan FO Cut Link CCTV KUT-
                                                                        022 TT. NOC 1012-003, Perbaikan kabel landai
                                                                        akibat tertimpa pemotongan pohon dan
                                                                        relokasi pole distribusi Cluster Taman Penta dan
 183      27-Nov-23             SINARMAS IDR             0002999994     Relokasi tiang link FO SMK PGRI 2 Badung                    4,570,114      5,022,103            -           451,989             4,570,114

                                                                        FIBEART TRANS NETWORK, PT , Uang Muka
                                                                        Beban Umum atas Giro Mundur 60 Hari setelah
                                                                        BAST Pelunasan Pengadaan Tiang 7 Meter PT
 184      27-Nov-23             MANDIRI IDR             1220011559559   Fibeart Trans Network - PO : 1010036298 - Trf             559,440,000    559,440,000            -                  -          559,440,000
                                                                        ARALIA ARTHA MANDIRI, CV , Uang Muka
                                                                        Beban Umum atas Pembayaran Pengadaan
                                                                        Material PC CCTV untuk Kebutuhan CCTV 200
 185      27-Nov-23             MANDIRI IDR             1220011559559   titik Diskominfo PO:1010039147Trf                         542,400,057    488,648,700     53,751,357                -          542,400,057
                                                                        JELAJAH DATA SEMESTA, PT, Tagihan 100%
                                                                        After Installation Pengadaan Vehicle Plate
                                                                        Recognition Sofware (SAQTI) sebanyak
 186      27-Nov-23             MANDIRI IDR             1220011559559   1086unit                                                5,000,000,000   4,587,155,963   504,587,156       91,743,119        5,000,000,000
Page 16
                                                                                                    Page 13
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK     DPP            PPN              PPh             NET DIBAYARKAN
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
                                                                        60.000Mtr dan Cable Optical Drop 4 Core with
 187      30-Nov-23             MANDIRI IDR             1220011559559   Mesenger sebanyak 18.000Mtr                             200,799,000    180,900,000     19,899,000                -          200,799,000
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Bracket Ubiquity ARM Sebanyak 10 Unit, Kabel
 188      1-Dec-23                BCA IDR                3193058058     Power 2PIN 1.5M Sebanyak 5 Pcs                            1,490,175      1,342,500       147,675                 -            1,490,175
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Tape Label Casio XR-9WEI on White Sebanyak
 189      1-Dec-23                BCA IDR                3193058058     15 Pcs                                                    2,414,250      2,175,000       239,250                 -            2,414,250

                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
 190      1-Dec-23                BCA IDR                3193058058     Splitter HDMI 1 Input-6 Output Sebanyak 1 Unit            7,381,500      6,650,000       731,500                 -            7,381,500
                                                                        JOHNSON COM INDONESIA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        24 Core Link Akses M_16 Taman Ayun & M_67
 191      1-Dec-23              MANDIRI IDR             1220011559559   Taman Sangeh                                             38,223,009     35,722,438      3,929,468        1,428,897           38,223,009

                                                                        ASIA TELCO NETWORKS, PT , Pembelian Cable
                                                                        Network UTP Cat-6 No Connector sebanyak
 192      1-Dec-23              MANDIRI IDR             1220011559559   12.200 MTR untuk Kebutuhan Stock Q3                      93,196,044     83,960,400      9,235,644                -           93,196,044
                                                                        ASIA TELCO NETWORKS, PT , Pembelia Cable
                                                                        Network UTP Cat-5E Sebanyak 30.500 MTR
 193      1-Dec-23              MANDIRI IDR             1220011559559   untuk Kebutuhan Java Jazz dan GBK 2023                  176,046,000    158,600,000     17,446,000                -          176,046,000
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
 194      1-Dec-23              MANDIRI IDR             1220011559559   Network UTP CAT-5E Sebanyak 12.200 Mtr                   67,710,000     61,000,000      6,710,000                -           67,710,000
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
                                                                        Timur - Perum Damri Cabang Bandara Soekarno
 195      1-Dec-23              MANDIRI IDR             1220011559559   Hatta                                                     5,818,446      5,437,800       598,158          217,512             5,818,446
                                                                        JELAJAH DATA SEMESTA, PT , Tagihan 100%
                                                                        After Installation Pengadaan Vehicle Plate
                                                                        Recognition Sofware (SAQTI) sebanyak
 196      1-Dec-23              MANDIRI IDR             1220011559559   1086unit                                              3,000,000,000   2,752,293,578   302,752,294       55,045,872        3,000,000,000
                                                                        JELAJAH DATA SEMESTA, PT , Tagihan 100%
                                                                        After Installation Pengadaan Vehicle Plate
                                                                        Recognition Sofware (SAQTI) sebanyak
 197      1-Dec-23              MANDIRI IDR             1220011559559   1086unit                                                500,000,000    458,715,596     50,458,716        9,174,312          500,000,000

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Recidence Jl. Kemang Utara
 198      1-Dec-23              MANDIRI IDR             1220011559559   Impact Kabel Landai site MP Bangka-001                    2,735,653      2,556,685       281,235          102,267             2,735,653
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Vandalisme site MP
 199      1-Dec-23              MANDIRI IDR             1220011559559   Bangka-001                                                4,732,487      4,422,885       486,517          176,915             4,732,487
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kebakaran site Lebak
 200      1-Dec-23              MANDIRI IDR             1220011559559   Bulus-016                                                 3,188,263      2,979,685       327,765          119,187             3,188,263
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Vandalisme site
 201      1-Dec-23              MANDIRI IDR             1220011559559   Bintaro-010                                               2,831,953      2,646,685       291,135          105,867             2,831,953
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW04 Kapuk, Cengkareng, Jak-
 202      1-Dec-23              MANDIRI IDR             1220011559559   Bar                                                       2,456,383      2,295,685       252,525              91,827          2,456,383
Page 17
                                                                                                  Page 14
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                            NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN               NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW04 Rawa Buaya, Cengkareng,
 203      1-Dec-23              MANDIRI IDR             1220011559559   Jak-Bar                                                 2,284,327     2,134,885        234,837              85,395          2,284,327
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW10 Semanan, Kalideres, Jak-
 204      1-Dec-23              MANDIRI IDR             1220011559559   Bar                                                     2,113,983     1,975,685        217,325              79,027          2,113,983
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Tiang FO Jakwifi Impact
                                                                        Longsor site Diskominfo AP RW01 Batu Ampar,
 205      1-Dec-23              MANDIRI IDR             1220011559559   Kramat Jati, Jak-Tim                                    2,088,731     1,952,085        214,729              78,083          2,088,731

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
 206      1-Dec-23              MANDIRI IDR             1220011559559   Diskominfo AP RW05 Kamal Kalideres, Jak-Bar             2,338,255     2,185,285        240,381              87,411          2,338,255
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW02, Pondok Kopi, Duren
 207      1-Dec-23              MANDIRI IDR             1220011559559   Sawit, Jak-Tim                                          2,141,803     2,001,685        220,185              80,067          2,141,803
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW01, Kamal Muara,
 208      1-Dec-23              MANDIRI IDR             1220011559559   Penjaringan, Jak-Ut                                     2,868,547     2,680,885        294,897          107,235             2,868,547
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW04, kapuk Cengkareng, Jak-
 209      1-Dec-23              MANDIRI IDR             1220011559559   Bar                                                     2,634,003     2,461,685        270,785              98,467          2,634,003
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW03 Tanjung Barat, Jagakarsa,
 210      1-Dec-23              MANDIRI IDR             1220011559559   Jak-Sel                                                 2,813,763     2,629,685        289,265          105,187             2,813,763
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
 211      1-Dec-23              MANDIRI IDR             1220011559559   Dishub Jl. Raya Bogor - Jl. Cijantung                   3,023,483     2,825,685        310,825          113,027             3,023,483
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 54 di Apartement Green
 212      4-Dec-23              MANDIRI IDR             1220011559559   Pramuka                                                 4,116,000     4,200,000              -              84,000          4,116,000
                                                                        BIBIT , Pekerjaan Relokasi tiang distribusi
                                                                        Cluster Banjar Pande dan Banjar Mumbul (PO
                                                                        Rp.3.617.626,- Potongan PPh 21(9%)
 213      5-Dec-23              SINARMAS IDR             0002999994     Rp.325.586,-)                                           3,292,040     3,617,626              -          325,586             3,292,040
                                                                        JELAJAH DATA SEMESTA, PT , Tagihan 100%
                                                                        After Installation Pengadaan Vehicle Plate
                                                                        Recognition Sofware (SAQTI) sebanyak
 214      5-Dec-23              MANDIRI IDR             1220011559559   1086unit                                            1,000,000,000   917,431,193     100,917,431       18,348,624        1,000,000,000
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Sebrang Kelurahan
 215      6-Dec-23              MANDIRI IDR             1220011559559   Kesambi                                                   433,097         399,720         43,969            10,592           433,097
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Perempatan Pemuda
 216      6-Dec-23              MANDIRI IDR             1220011559559   Bypass                                                    363,753         335,720         36,929             8,896           363,753
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Perempatan Pemuda
 217      6-Dec-23              MANDIRI IDR             1220011559559   Cipto (Arah Sudarsono)                                    507,317         468,220         51,504            12,407           507,317
Page 18
                                                                                                   Page 15
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
 218      6-Dec-23              MANDIRI IDR             1220011559559   Udara Final Kota Cirebon - Pegambiran                       406,313         375,000         41,250             9,937           406,313
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Pegambiran (Arah
 219      6-Dec-23              MANDIRI IDR             1220011559559   dari Mundu)                                                 309,795         285,920         31,451             7,576           309,795
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Ciremai (Arah Pasar
 220      6-Dec-23              MANDIRI IDR             1220011559559   Perumnas)                                                   379,876         350,600         38,566             9,290           379,876
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Brigjen Darsono
 221      6-Dec-23              MANDIRI IDR             1220011559559   (Arah Perjuangan)                                           455,937         420,800         46,288            11,151           455,937
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Dukuh Semar (Arah
 222      6-Dec-23              MANDIRI IDR             1220011559559   Terminal)                                                   468,355         432,260         47,549            11,454           468,355
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Lamer Drajat (Arah
 223      6-Dec-23              MANDIRI IDR             1220011559559   Perumnas)                                                   367,437         339,120         37,303             8,986           367,437
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel Udara Final
 224      6-Dec-23              MANDIRI IDR             1220011559559   Kota Bandung - CCTV 30 Titik                            102,707,138    94,792,005     10,427,121         2,511,988          102,707,138
                                                                        MULIA INTIPELANGI, PT , Biaya supervisi
                                                                        pekerjaan troubleshoot Bali Fiber weekday tgl
                                                                        17/10/23 di Mall Taman Anggrek (Inv:
 225      6-Dec-23              MANDIRI IDR             1220011559559   2023100345)                                                  90,900          90,000          9,900             9,000            90,900
                                                                        MULIA INTIPELANGI, PT , Biaya supervisi
                                                                        pekerjaan troubleshoot bali fiber weekday tgl
                                                                        07/11/23 di Mall Taman Anggrek untuk Tenant
 226      6-Dec-23              MANDIRI IDR             1220011559559   Wakai (Inv: 2023110259)                                      90,900          90,000          9,900             9,000            90,900
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Cable Drop With Messenger Sebanyak 10.000
 227      7-Dec-23              MANDIRI IDR             1220011559559   Mtr                                                      21,090,000    19,000,000      2,090,000                 -           21,090,000
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 5
 228      7-Dec-23              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 6
 229      7-Dec-23              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 7
 230      7-Dec-23              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
 231      7-Dec-23              MANDIRI IDR             1220011559559   Pusat - Java Jazz Festival                              111,828,375   104,512,500     11,496,375         4,180,500          111,828,375
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        OTB Indoor 1U 24 Core SC/UPC Sebanyak 50
 232      7-Dec-23              MANDIRI IDR             1220011559559   Unit                                                     30,525,000    27,500,000      3,025,000                 -           30,525,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 233      8-Dec-23              MANDIRI IDR             1220011559559   84.000Mtr                                               195,804,000   176,400,000     19,404,000                 -          195,804,000
Page 19
                                                                                                   Page 16
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                 NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK      DPP               PPN              PPh             NET DIBAYARKAN

                                                                        DUTA HITA JAYA, PT , DP 30% atas Pengadaan
 234      8-Dec-23              MANDIRI IDR             1220011559559   Pole FO Round 7M sebanyak 1.000 Unit                   351,000,000     351,000,000                -                 -          351,000,000
                                                                        JELAJAH DATA SEMESTA, PT , Tagihan 100%
                                                                        After Installation Pengadaan Vehicle Plate
                                                                        Recognition Sofware (SAQTI) sebanyak
 235      8-Dec-23              MANDIRI IDR             1220011559559   1086unit                                             2,000,000,000    1,834,862,385     201,834,862        36,697,248        2,000,000,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 56 di Apartement Green
 236      11-Dec-23             MANDIRI IDR             1220011559559   Pramuka                                                  4,116,000        4,200,000               -              84,000          4,116,000
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Belden UTP Cat-52 1000 FT 1583A Sebanyak
 237      12-Dec-23             MANDIRI IDR             1220011559559   305 Mtr                                                  1,631,700        1,470,000         161,700                 -            1,631,700
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Router RB4011 IGS+RM Mikrotik Sebanyak 1
 238      12-Dec-23             MANDIRI IDR             1220011559559   Pcs                                                      3,657,450        3,295,000         362,450                 -            3,657,450
                                                                        METALOGIC INFOMITRA, PT , Pembelian USB C
                                                                        to Gigabit Ethernet LAN Adapter Aluminium
 239      12-Dec-23             MANDIRI IDR             1220011559559   Alloy Sebanyak 6 Unit                                    1,252,080        1,128,000         124,080                 -            1,252,080
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , Pelunasan 90% DP atas Pengadaan ONT
                                                                        GPON 1GE SC/APC sebanyak 2.540Pcs dan
                                                                        Nokia Wifi Beacon Dual Band AX1800 2XGE
                                                                        sebanyak 2.540 Unit (Pelunasan oleh SKBDN
 240      13-Dec-23             VICTORIA IDR             0880003577     133SKBDN/V/23)                                       2,879,395,422    2,594,049,930     285,345,492                 -        2,879,395,422
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
 241      13-Dec-23             MANDIRI IDR             1220011559559   Network UTP Cat 5E Sebanyak 6.100 Mtr                   33,855,000      30,500,000        3,355,000                 -           33,855,000
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Network UTP Cat 5E Sebanyak 6.100 Mtr untuk
 242      13-Dec-23             MANDIRI IDR             1220011559559   Kebutuhan HUT Bank Mandiri                              33,855,000      30,500,000        3,355,000                 -           33,855,000
                                                                        JELAJAH DATA SEMESTA, PT , Tagihan 100%
                                                                        After Installation Pengadaan Vehicle Plate
                                                                        Recognition Sofware (SAQTI) sebanyak
 243      13-Dec-23             MANDIRI IDR             1220011559559   1086unit                                            14,500,000,000   13,302,752,294    1,463,302,752      266,055,046       14,500,000,000

                                                                        FIBEART TRANS NETWORK, PT , Uang Muka
                                                                        Beban Umum atas Giro Mundur 60 Hari setelah
                                                                        BAST Pelunasan Pengadaan Tiang 7 Meter PT
 244      13-Dec-23             MANDIRI IDR             1220011559559   Fibeart Trans Network - PO : 1010036298 - Trf          559,440,000     504,000,000       55,440,000                 -          559,440,000
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Kesambi (Arah
 245      14-Dec-23             MANDIRI IDR             1220011559559   Persimpangan)                                              369,842           341,340           37,547             9,045           369,842
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Simpang Krucuk
 246      14-Dec-23             MANDIRI IDR             1220011559559   (Arah Siliwangi)                                           316,967           292,540           32,179             7,752           316,967
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - KS Tubun (Arah ke
 247      14-Dec-23             MANDIRI IDR             1220011559559   Taman)                                                     269,380           248,620           27,348             6,588           269,380
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Pagongan (Arah
 248      14-Dec-23             MANDIRI IDR             1220011559559   Persimpangan)                                              574,320           530,060           58,306            14,046           574,320
Page 20
                                                                                                   Page 17
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Cangkol (Arah
 249      14-Dec-23             MANDIRI IDR             1220011559559   Ariodinoto)                                                484,194         446,880         49,156            11,842           484,194
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Kota Cirebon - Siliwangi (Arah
 250      14-Dec-23             MANDIRI IDR             1220011559559   Veteran)                                                   410,343         378,720         41,659            10,036           410,343

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 251      14-Dec-23             MANDIRI IDR             1220011559559   Kota Cirebon - Wahidin (Arah Gunung Sari)                4,139,902     3,820,860       420,294           101,252             4,139,902
                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Cirebon - Pengganti Sukapura 004 (Arah
 252      14-Dec-23             MANDIRI IDR             1220011559559   Persimpangan)                                            2,645,777     2,441,880       268,606               64,709          2,645,777
                                                                        INOVASI SISTEM TEKNOLOGI, PT , Uang Muka
                                                                        Beban Umum atas Pelunasan (70%) untuk
                                                                        pembelian perangkat NGAF 5500 kebutuhan
 253      14-Dec-23             MANDIRI IDR             1220011559559   Universitas Bakrie - PO :1010038395 - Trf              588,219,590   588,219,590              -                 -          588,219,590
                                                                        DIRGA BAHARI PERKASA, PT , Tagihan
                                                                        Pelunasan 70% atas Pengadaan CCTV DS-
 254      14-Dec-23             MANDIRI IDR             1220011559559   2CT4051G0-1 Hikvision sebanyak 1.000 Unit              839,605,998   756,401,800     83,204,198                 -          839,605,998
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak Truck
                                                                        site Diskominfo AP RW02, Sunter Jaya, Tanjung
 255      14-Dec-23             MANDIRI IDR             1220011559559   Priok, Jak-Ut                                            1,527,179     1,745,347              -          218,168             1,527,179
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Sabotase site
 256      14-Dec-23             MANDIRI IDR             1220011559559   Pegadungan-027                                           1,716,179     1,961,347              -          245,168             1,716,179
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak Truck
                                                                        site Diskominfo AP RW01, Batch 2, Ancol,
 257      14-Dec-23             MANDIRI IDR             1220011559559   Pademangan, Jak-Ut                                       1,563,580     1,786,948              -          223,368             1,563,580
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Impact
                                                                        Pembangunan Jalan site Diskominfo AP RW13,
 258      14-Dec-23             MANDIRI IDR             1220011559559   Kalibaru, Cilincing, Jak-Ut                              1,244,380     1,422,148              -          177,768             1,244,380
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Pembangunan Trotoar
 259      14-Dec-23             MANDIRI IDR             1220011559559   Jalan site MP Duri Kepa-001                              3,398,630     3,884,148              -          485,518             3,398,630
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Reroute Impact
                                                                        Comcase Lahan Private Jl. Kemang Utara site
 260      14-Dec-23             MANDIRI IDR             1220011559559   Bangka-012                                               3,343,330     3,820,948              -          477,618             3,343,330
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Cluster Cipinang
 261      14-Dec-23             MANDIRI IDR             1220011559559   Muara RW03 site Cipinang Besar Selatan-002                 834,880         954,148            -          119,268              834,880
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Progres relokasi FAT Cluster Villa
                                                                        Meruya Complain Customer site MP Meruya
 262      14-Dec-23             MANDIRI IDR             1220011559559   Selatan-001                                              1,522,455     1,739,948              -          217,493             1,522,455
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Cluster
 263      14-Dec-23             MANDIRI IDR             1220011559559   Megapolitan Estate RW13 site Cinere-014                  1,189,780     1,359,748              -          169,968             1,189,780
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tersambar Truck
 264      14-Dec-23             MANDIRI IDR             1220011559559   dan Tiang Miring site Jatiasih-001                       2,147,380     2,454,148              -          306,768             2,147,380
Page 21
                                                                                                     Page 18
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK     DPP            PPN              PPh           NET DIBAYARKAN
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Kabel Distribusi Cluster Puri
                                                                        Indah Impact Pembangunan Rumah site
 265      14-Dec-23             MANDIRI IDR             1220011559559   Kembangan Selatan-011                                       2,007,380      2,294,148            -           286,768           2,007,380
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan HH Impact Pemindahan
                                                                        Box FAT dan Complain Warga RW11 site
 266      14-Dec-23             MANDIRI IDR             1220011559559   Kembangan Utara-022                                         5,022,980      5,740,548            -           717,568           5,022,980
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Corp Jakarta Smart City
                                                                        Ipmact Kabel Dipotong site Rumah Pompa
 267      14-Dec-23             MANDIRI IDR             1220011559559   Bimoli                                                      3,175,680      3,629,348            -           453,668           3,175,680
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Reroute Impact
                                                                        Comcase Lahan Jl. Kemang Utara Site Bangka-
 268      14-Dec-23             MANDIRI IDR             1220011559559   012                                                         1,758,179      2,009,347            -           251,168           1,758,179
                                                                        BINTANG MAS UTAMA, CV , Biaya Pembelian
                                                                        Pipe PVC Clipsal-20 mm White, Shock Pipe
                                                                        Clipsal -20 mm Black dan Pipe Fitting PVC 20
 269      15-Dec-23             MANDIRI IDR             1220011559559   mm (PO Rp.10.116.540,- PPN Rp.1.002.540,- )                10,116,540      9,114,000      1,002,540              -           10,116,540

                                                                        BINTANG MAS UTAMA, CV , "Biaya Pembelian
                                                                        Router Mikrotik L3MPLS CCR1036-8G-2S-EM,
 270      15-Dec-23             MANDIRI IDR             1220011559559   MCB 1 Phase 16 Ampere Schneider,                           32,979,765     29,711,500      3,268,265              -           32,979,765
                                                                        BINTANG MAS UTAMA, CV , Biaya Pembelian
                                                                        Pipe PVC Clipsal-20 mm White dan Shock Pipa-
                                                                        PVC Clipsal White-20 mm(PO Rp.37.651200,-
 271      15-Dec-23             MANDIRI IDR             1220011559559   PPN Rp.3.731.200,- )                                       37,651,200     33,920,000      3,731,200              -           37,651,200
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 272      15-Dec-23             MANDIRI IDR             1220011559559   84.000Mtr                                                 195,804,000    176,400,000     19,404,000              -          195,804,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 273      15-Dec-23             MANDIRI IDR             1220011559559   104.000Mtr                                                242,424,000    218,400,000     24,024,000              -          242,424,000
                                                                        MONETI INDO TEKNO, PT , Pembelian ODB
                                                                        Outdoor 24 Core SC/UPC, 12 Adapter 12 Pigtail
 274      15-Dec-23             MANDIRI IDR             1220011559559   2mm Sebanyak 150 Unit                                      64,102,500     57,750,000      6,352,500              -           64,102,500
                                                                        COMMUNICATION CABLE SYSTEMS INDONESIA,
                                                                        PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                        Cable Optical SM ADSS 24 Core sebanyak
 275      15-Dec-23             MANDIRI IDR             1220011559559   40.000Mtr                                                 287,712,000    259,200,000     28,512,000              -          287,712,000
                                                                        COMMUNICATION CABLE SYSTEMS INDONESIA,
                                                                        PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                        Cable Optical SM ADSS 24 Core sebanyak
 276      15-Dec-23             MANDIRI IDR             1220011559559   60.000Mtr                                                 431,568,000    388,800,000     42,768,000              -          431,568,000
                                                                        I KETUT DARTA , Pekerjaan Activation For New
                                                                        Services Corporate Delivery 818638 Keznet (PO
                                                                        Rp.7.881.008,- Potongan PPh 21(2.5%)
 277      18-Dec-23             SINARMAS IDR             0002999994     Rp.197.025,-                                                7,683,983      7,881,008            -           197,025           7,683,983
                                                                        TOKOPEDIA, PT , Biaya Pembelian Network
 278      18-Dec-23             SINARMAS IDR             0002999994     Cable Tester Tool dan Senter LED                            3,792,900      3,792,900            -                -            3,792,900
                                                                        JELAJAH DATA SEMESTA, PT , Tagihan 100%
                                                                        After Installation Pengadaan Vehicle Plate
                                                                        Recognition Sofware (SAQTI) sebanyak
 279      18-Dec-23             MANDIRI IDR             1220011559559   1086unit                                                3,593,500,000   3,296,788,991   362,646,789       65,935,780      3,593,500,000
Page 22
                                                                                                     Page 19
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP             PPN              PPh           NET DIBAYARKAN

                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT GPON 1GE
 280      19-Dec-23             MANDIRI IDR             1220011559559   SC/APC Batch 3 sebanyak 4.722 Pcs                         166,429,723   166,429,723              -               -          166,429,723

                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT GPON 1GE
 281      19-Dec-23             MANDIRI IDR             1220011559559   SC/APC Batch 3 sebanyak 4.722 Pcs - PPN                    18,307,269             -     18,307,269               -           18,307,269
                                                                        BANGUN KELOLA SWADAYA, PT , Tagihan 100%
                                                                        Pekerjaan Pembangunan Pondasi New ODC
 282      19-Dec-23             MANDIRI IDR             1220011559559   Cluster Wahana Pondok Gede                                 61,948,787    57,174,699      6,289,217         1,515,129         61,948,787
                                                                        BANGUN KELOLA SWADAYA, PT , Tagihan 100%
                                                                        Penarikan Kabel FO 37 site Diskominfo Kota
 283      19-Dec-23             MANDIRI IDR             1220011559559   Cirebon - Pekerjaan OPD Internet                          380,332,780   351,022,408     38,612,465         9,302,093        380,332,780

                                                                        BANGUN KELOLA SWADAYA, PT , Tagihan 100%
                                                                        Penarikan Kabel FO 18 site Diskominfo CCTV
 284      19-Dec-23             MANDIRI IDR             1220011559559   Purwakarta dan OPD Internet Purwakarta                    171,283,386   158,083,420     17,389,176         4,189,210        171,283,386

                                                                        BANGUN KELOLA SWADAYA, PT , Tagihan 100%
 285      19-Dec-23             MANDIRI IDR             1220011559559   Pekerjaan Install Pole CCTV & Accessories 5 Site           28,227,280    26,051,942      2,865,714          690,376          28,227,280
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
 286      21-Dec-23               BCA IDR                3193058058     Router RB4011 IGS+Mikrotik Sebanyak 6 Pcs                  21,944,700    19,770,000      2,174,700               -           21,944,700
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Router RB4011 IGS+RM Mikrotik Sebanyak 3
 287      21-Dec-23               BCA IDR                3193058058     Pcs                                                        10,972,350     9,885,000      1,087,350               -           10,972,350
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Cable Network UTP Cat 6 3M With RJ45
 288      21-Dec-23               BCA IDR                3193058058     Connector Sebanyak 100 Unit                                 7,881,000     7,100,000       781,000                -            7,881,000
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Cable Network UTP Cat 6 3M With RJ45
 289      21-Dec-23               BCA IDR                3193058058     Connector Sebanyak 100 Unit                                 7,881,000     7,100,000       781,000                -            7,881,000
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Terminal Block Stopper E/CUK Sebanyak 400
 290      21-Dec-23               BCA IDR                3193058058     Pcs untuk Kebutuhan CCTV 200 Titik                          1,332,000     1,200,000       132,000                -            1,332,000
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Router RB4011 IGS+RM Mikrotik Sebanyak 2
 291      21-Dec-23               BCA IDR                3193058058     Pcs                                                         7,314,900     6,590,000       724,900                -            7,314,900

                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Terminal Block Rail 1 Batang 100cm Sebanyak
 292      21-Dec-23               BCA IDR                3193058058     4.000cm untuk Kebutuhan CCTV 200 Titik                        643,800         580,000         63,800             -             643,800
                                                                        ABLOOMY TECHNOLOGIES, INC , Pengadaan
                                                                        Access Point License Abloomy periode Feb, Mar
                                                                        & Apr 2023 sebanyak 127 Pcs, periode Mei, Jun
 293      22-Dec-23             SINARMAS USD             0000670707     & Jul 2023 sebanyak 124 Pcs                                52,498,031    58,331,145              -         5,833,115         52,498,031
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 294      22-Dec-23             MANDIRI IDR             1220011559559   84.000Mtr                                                 195,804,000   176,400,000     19,404,000               -          195,804,000
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Pemindahan Tiang FAT-02-
                                                                        026 Cluster Pondok Kelapa RW09, Impact
                                                                        Pembangunan Trotoar site MP Pondok Kelapa-
 295      22-Dec-23             MANDIRI IDR             1220011559559   001                                                         1,658,429     1,895,347              -          236,918           1,658,429
Page 23
                                                                                                    Page 20
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK     DPP            PPN              PPh          NET DIBAYARKAN
                                                                        I KETUT DARTA , Biaya Pekerjaan Activation For
                                                                        New Services Corporate Delivery 818617 Kantor
                                                                        Desa Blahkiuh (PO Rp.7.934.800,- Potongan PPh
 296      27-Dec-23             SINARMAS IDR             0002999994     21(2.5%) Rp.198.370,- )                                   7,736,430      7,934,800            -           198,370          7,736,430

                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan Switch Nokia SAS
 297      27-Dec-23             MANDIRI IDR             1220011559559   MXP dan IXR (Batch 2) sebanyak 150 Unit               1,555,085,500   1,555,085,500           -               -        1,555,085,500

                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan Switch Nokia SAS
 298      27-Dec-23             MANDIRI IDR             1220011559559   MXP dan IXR (Batch 2) sebanyak 150 Unit - PPN           171,059,405             -     171,059,405             -          171,059,405
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan Pengadaan
                                                                        Material Nokia-BNG IP Router solutions
 299      27-Dec-23             MANDIRI IDR             1220011559559   sebanyak 7 Unit                                       1,549,300,000   1,549,300,000           -               -        1,549,300,000
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan Pengadaan
                                                                        Material Nokia-BNG IP Router solutions
 300      27-Dec-23             MANDIRI IDR             1220011559559   sebanyak 7 Unit - PPN                                   170,423,000             -     170,423,000             -          170,423,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 301      28-Dec-23             MANDIRI IDR             1220011559559   84.000Mtr                                               195,804,000    176,400,000     19,404,000             -          195,804,000
                                                                        METALOGIC INFOMITRA, PT , Pembelian Router
                                                                        CCR1036-8G-2S+EMV2 Mikrotik Sebanyak 1
                                                                        Unit untuk Kebutuhan Indonesia Convention
 302       2-Jan-24             MANDIRI IDR             1220011559559   Eexhibition                                              20,967,900     18,890,000      2,077,900             -           20,967,900
                                                                        TELCO ABADI JAYA, PT , Pembelian SFP+ Copper
 303       2-Jan-24             MANDIRI IDR             1220011559559   10GB 30M Sebanyak 4 Unit                                  5,305,800      4,780,000       525,800              -            5,305,800
                                                                        TELCO ABADI JAYA, PT , Pembelian Pipe PVC
                                                                        20MM White Sebanyak 100 BTG untuk
 304       2-Jan-24             MANDIRI IDR             1220011559559   Kebutuhan Q3                                              1,609,500      1,450,000       159,500              -            1,609,500
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable UTP
 305       2-Jan-24             MANDIRI IDR             1220011559559   Cat 6 with Connector 3M Sebanyak 50 Unit                  3,996,000      3,600,000       396,000              -            3,996,000

                                                                        TELCO ABADI JAYA, PT , Pembelian Visual Fault
 306       2-Jan-24             MANDIRI IDR             1220011559559   Locator Range 10KM Jointwit Sebanyak 10 Unit              3,496,500      3,150,000       346,500              -            3,496,500

                                                                        TELCO ABADI JAYA, PT , Pembelian Hand Tools
                                                                        Ladder Telescopic 4.4M Sebanyak 1 Unit, Single
 307       2-Jan-24             MANDIRI IDR             1220011559559   Telescopic Ladder 6.2M Sebanyak 1 Unit                    3,241,200      2,920,000       321,200              -            3,241,200
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 16
 308       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150      6,900,000       759,000          182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 17
 309       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150      6,900,000       759,000          182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 20
 310       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150      6,900,000       759,000          182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 21
 311       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150      6,900,000       759,000          182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 22
 312       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150      6,900,000       759,000          182,850          7,476,150
Page 24
                                                                                                    Page 21
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                               NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 10
 313       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 13
 314       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 25
 315       2-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                        Build Jakarta Pusat - Akses Site - Balai Kota
 316       2-Jan-24             MANDIRI IDR             1220011559559   Satpol PP (Compliment Site Radio)                         11,229,797    10,278,990      1,130,689          179,882            11,229,797

                                                                        DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                        Build Jakarta Pusat - Akses Site - Patung Kuda
 317       2-Jan-24             MANDIRI IDR             1220011559559   Satpol PP (Compliment Site Radio)                          4,779,283     4,374,630       481,209               76,556          4,779,283
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 4 Core SC/UPC With Adaptor With
 318       4-Jan-24             MANDIRI IDR             1220011559559   Pigtail Sebanyak 10 Unit                                     721,500         650,000         71,500               -             721,500
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Power NYYHY 3X2.5MM Sebanyak 1.200 Mtr,
 319       4-Jan-24             MANDIRI IDR             1220011559559   Cable Network STP Cat 6 Sebanyak 4574 Mtr                 94,827,488    85,430,170      9,397,318                 -           94,827,488
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 8Core SC/UPC With Adaptor Pigtail
 320       4-Jan-24             MANDIRI IDR             1220011559559   Sebanyak 100 Pcs                                           9,990,000     9,000,000       990,000                  -            9,990,000

                                                                        DIAN MUSTIKA AGUNG, PT , Pembelian Hand
 321       4-Jan-24             MANDIRI IDR             1220011559559   Tools Ladder Telescopic 4.4M Sebanyak 15 Unit             24,142,500    21,750,000      2,392,500                 -           24,142,500

                                                                        BERCA HARDAYAPERKASA, PT , Tagihan
                                                                        Pelunasan 70% atas Pengadaan Server
                                                                        NF5180M6, S00HDD0000A00HDD Enterprise
 322       4-Jan-24             MANDIRI IDR             1220011559559   16TB 3.5 Inch sebanyak 14 Unit + Jasa Instalasi          232,365,000   210,000,000     23,100,000          735,000           232,365,000
                                                                        ASIA TELCO NETWORKS, PT , Pembelian SFP
                                                                        BIDI 1.25G Tx 1310/1550 DDM LC 10KM
                                                                        Sebanyak 100 Pcs, SFP BIDI 1.25G TX 1550/1310
                                                                        DDm LC 10KM Sebanyak 100 Pcs untuk
 323       4-Jan-24             MANDIRI IDR             1220011559559   Kebutuhan Q2                                              52,073,874    46,913,400      5,160,474                 -           52,073,874
                                                                        ASIA TELCO NETWORKS, PT , Pembelian Cable
                                                                        Network UTP Cat 5-E untuk Kebutuhan We The
 324       4-Jan-24             MANDIRI IDR             1220011559559   Fest 2023 Sebanyak 7.625 MTR                              44,011,500    39,650,000      4,361,500                 -           44,011,500
                                                                        ASIA TELCO NETWORKS, PT , Pembelian SFP Bidi
                                                                        1.25 GB 1310NM/1550NM DDM LC 10KM
                                                                        Sebanyak 100 Pcs, SFP Bidi 1.25 GB
                                                                        1550NM/1310Nm DDM LC 10KM Sebanyak 100
 325       4-Jan-24             MANDIRI IDR             1220011559559   Pcs                                                       52,073,874    46,913,400      5,160,474                 -           52,073,874

                                                                        ASIA TELCO NETWORKS, PT , Pembelian Cable
 326       4-Jan-24             MANDIRI IDR             1220011559559   Network UTP Cat-5E Sebanyak 6.100 Mtr                     35,209,200    31,720,000      3,489,200                 -           35,209,200
                                                                        DIRGA BAHARI PERKASA, PT , DP 30% atas
                                                                        Pengadaan CCTV DS-2CT4051G0-1 Hikvision
 327       4-Jan-24             MANDIRI IDR             1220011559559   sebanyak 500 Unit (Batch 3)                              162,086,100   162,086,100              -                 -          162,086,100
                                                                        DIRGA BAHARI PERKASA, PT , DP 30% atas
                                                                        Pengadaan CCTV DS-2CT4051G0-1 Hikvision
 328       4-Jan-24             MANDIRI IDR             1220011559559   sebanyak 500 Unit (Batch 3) - PPN                         17,829,471             -     17,829,471                 -           17,829,471
Page 25
                                                                                                   Page 22
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        INDONESIA NET TEKNOLOGI, PT , Biaya Instalasi
                                                                        Sewa Local Loop 10Mbps untuk Tenant PT
                                                                        Matahari Graha Fantasi di Summarecon Villagio
 329       4-Jan-24             MANDIRI IDR             1220011559559   Karawang                                                  3,270,000     3,000,000       330,000               60,000          3,270,000
                                                                        INDONESIA NET TEKNOLOGI, PT , Biaya Core PT
                                                                        Indonesia Net Teknologi untuk Tenant
 330       4-Jan-24             MANDIRI IDR             1220011559559   Summarecon Villagio Karawang                             16,350,000    15,000,000      1,650,000          300,000            16,350,000
                                                                        GRIYA MURIA KENCANA, PT , Biaya Supervisi
                                                                        atas Penarikan Kabel dan Instalasi untuk PT
                                                                        Feedback Infra di LT.5 Ruang 507 Gedung Prince
 331       5-Jan-24             MANDIRI IDR             1220011559559   Centre                                                      505,000         500,000         55,000            50,000           505,000
                                                                        PLANET TECHNOLOGY CORPORATION , Uang
                                                                        Muka Beban Umum atas Pembayaran
                                                                        Pengadaan Switch Planet IGS-4215-8P2T2S 160
                                                                        Pcs untuk Kebutuhan Project CCTV 250 [PO
 332       5-Jan-24            SINARMAS USD              0000670707     1010039667] - Trf                                       611,706,880   611,706,880              -                 -          611,706,880
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 333       5-Jan-24             MANDIRI IDR             1220011559559   80.000Mtr                                               186,480,000   168,000,000     18,480,000                 -          186,480,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 334       5-Jan-24             MANDIRI IDR             1220011559559   36.000Mtr                                                83,916,000    75,600,000      8,316,000                 -           83,916,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 55 di Apartement Green
 335       5-Jan-24             MANDIRI IDR             1220011559559   Pramuka                                                   4,116,000     4,200,000              -              84,000          4,116,000
                                                                        WAHANA MANDIRI, TOKO , Pembelian Optical
                                                                        Power Meter Sebanyak 5 Unit Untuk Kebutuhan
 336       5-Jan-24             MANDIRI IDR             1220011559559   Dept. Government OPS                                     13,320,000    12,000,000      1,320,000                 -           13,320,000
                                                                        BADAN PENGELOLA WISMA MITRA SUNTER ,
                                                                        Biaya Supervisi Penarikan Kabel di Gedung
                                                                        Wisma Mitra Sunter untuk Tenant PT Sisma
 337       5-Jan-24             MANDIRI IDR             1220011559559   Medika International                                        450,000         500,000            -              50,000           450,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 57 di Apartement Green
 338       5-Jan-24             MANDIRI IDR             1220011559559   Pramuka                                                   4,116,000     4,200,000              -              84,000          4,116,000
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord Simplex LC-UPC/SC-UPC 3Mtr 150
                                                                        Pcs, Patchcord Simplex LC-UPC/SC-UPC 10 Mtr
 339       5-Jan-24             MANDIRI IDR             1220011559559   10 Pcs                                                    2,830,500     2,550,000       280,500                  -            2,830,500
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord Duplex FC-UPC/LC-UPC 5 Mtr
 340       5-Jan-24             MANDIRI IDR             1220011559559   Sebanyak 100 Pcs                                          2,442,000     2,200,000       242,000                  -            2,442,000
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord Simplex LC-UPC/SC-UPC 3 Mtr
 341       5-Jan-24             MANDIRI IDR             1220011559559   Sebanyak 100 Pcs                                          2,830,500     2,550,000       280,500                  -            2,830,500
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord Simplex SC-UPC/SC-UPC 3 Mtr
 342       5-Jan-24             MANDIRI IDR             1220011559559   Sebanyak 100 Pcs                                          1,665,000     1,500,000       165,000                  -            1,665,000
                                                                        NUVOS SOLUSINDO, PT , Pembelian Notebook
                                                                        MSI Cyborg 15 A12VE Core i7 12650H Win11
 343       5-Jan-24             MANDIRI IDR             1220011559559   Sebanyak 4 unit                                          65,934,000    59,400,000      6,534,000                 -           65,934,000
Page 26
                                                                                                     Page 23
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        BIBIT , Biaya Link CCTV KUT-010 impact
                                                                        pemindahan tiang untuk pelebaran akses
                                                                        masuk pemilik ruko,Kabel Landai dan tiang
                                                                        miring di Cluster Puri Nusa Dua dan Kabel
                                                                        Feeder Cluster Teras Hijau impact (PO
                                                                        Rp.4.228.600,- Potongan PPh 21(3%)
 344       8-Jan-24             SINARMAS IDR             0002999994     Rp.126.858,-)                                                4,101,742    4,228,600          -            126,858             4,101,742

                                                                        BIBIT , Biaya Kabel Feeder yang landai di Cluster
                                                                        Kori Nuansa Ungasan dan kabel distribusi
                                                                        Cluster Bayuh Asri dan - Reroute jalur kabel
                                                                        feeder Cluster Taman Penta (PO Rp.4.114.700,-
 345       8-Jan-24             SINARMAS IDR             0002999994     Potongan PPh 21(3%) Rp.123.441,- )                           3,991,259    4,114,700          -            123,441             3,991,259

                                                                        I NENGAH SUSASTRA , Pekerjaan Activation For
                                                                        New Services Corporate Delivery Koperasi Astha
                                                                        Karya Luhur (Banjar Tauman) (PO Rp.6.682.000,-
 346       8-Jan-24             SINARMAS IDR             0002999994     Potongan PPh 21(2.5%) Rp.167.050,-)                          6,514,950    6,682,000          -            167,050             6,514,950

                                                                        I NENGAH SUSASTRA , Pekerjaan Activation For
                                                                        New Services Corporate Delivery Koperasi Astha
                                                                        Karya Luhur (Banjar Tauman) (PO Rp.6.682.000,-
 347       8-Jan-24             SINARMAS IDR             0002999994     Potongan PPh 21(2.5%) Rp.167.050,-)                          6,514,950    6,682,000          -            167,050             6,514,950
                                                                        I NENGAH SUSASTRA , Pekerjaan Activation For
                                                                        New Services Corporate Delivery Koperasi Astha
                                                                        Karya Luhur (Banjar Dajan Peken) (PO
                                                                        Rp.5.168.800,- Potongan PPh 21(2.5%)
 348       8-Jan-24             SINARMAS IDR             0002999994     Rp.5.039.580,-)                                              5,039,580    5,168,800          -            129,220             5,039,580
                                                                        I NENGAH SUSASTRA , Pekerjaan Activation For
                                                                        New Services Corporate Delivery Koperasi Astha
                                                                        Karya Luhur (Banjar Belang), Koperasi (Banjar
                                                                        Pasekan) dan (Banjar Karangjung)(PO
                                                                        Rp.4.249.200,- Potongan PPh 21(2.5%)
 349       8-Jan-24             SINARMAS IDR             0002999994     Rp.106.230,-)                                                4,142,970    4,249,200          -            106,230             4,142,970
                                                                        BERKAH SYARIAH BERSAMA, PT , Pembelian
                                                                        Amaron Pro DIN 100/60038 100AH Kapasitas
 350       8-Jan-24             MANDIRI IDR             1220011559559   12V 100AH Sebanyak 4 Unit                                   11,322,000   10,200,000    1,122,000                 -           11,322,000

                                                                        BERKAH SYARIAH BERSAMA, PT , Pembelian Key
 351       8-Jan-24             MANDIRI IDR             1220011559559   Cabinet 200 Keys KW20-1093 Sebanyak 3 Unit                   4,578,750    4,125,000     453,750                  -            4,578,750
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Jakarta Selatan - Jl. Patal Senayan Dishub
 352       8-Jan-24             MANDIRI IDR             1220011559559   (Relokasi Jl.Metro Pondok Indah-C02)                         2,335,416    2,137,680     235,145               37,409          2,335,416

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 353       8-Jan-24             MANDIRI IDR             1220011559559   Pusat - PT Indosat Tbk - Arise Plus (Relokasi)               5,270,220    4,824,000     530,640               84,420          5,270,220
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 354       8-Jan-24             MANDIRI IDR             1220011559559   Pusat - PT Asia Pro Berjangka                                6,947,645    6,359,400     699,534           111,289             6,947,645

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 355       8-Jan-24             MANDIRI IDR             1220011559559   Pusat - Abdi Teknologi Informasi (Head Office)               2,942,377    2,693,250     296,258               47,131          2,942,377
Page 27
                                                                                                    Page 24
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 356       8-Jan-24             MANDIRI IDR             1220011559559   Pusat - PT Patra Jasa (Patra Jakarta Hotel)                8,748,959     8,008,200     880,902           140,143             8,748,959
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 357       8-Jan-24             MANDIRI IDR             1220011559559   Barat - PT Kuat Andal Nan Gemilang                        10,310,360     9,437,400    1,038,114          165,154            10,310,360

                                                                        FLUSSONIC, Biaya Pembelian Renewal Lisence
 358      11-Jan-24             MANDIRI IDR             1220011559559   Flussonic untuk CCTV - Paddle.com #55835658               65,903,230    65,903,230          -                   -           65,903,230

                                                                        FLUSSONIC, Pembayaran Biaya Licence
                                                                        Flussonic untuk kebutuhan Licence untuk CCTV
 359      11-Jan-24             MANDIRI IDR             1220011559559   343,CCTV 200 dan CCTV 250 Order #112475                  129,204,000   129,204,000          -                   -          129,204,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 360      12-Jan-24             MANDIRI IDR             1220011559559   59.776 Mtr                                               139,337,856   125,529,600   13,808,256                 -          139,337,856
                                                                        COMMUNICATION CABLE SYSTEMS INDONESIA,
                                                                        PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                        Cable Optical SM ADSS 32 Core sebanyak
                                                                        20.000Mtr, Cable Optical SM ADSS 96 Core
 361      15-Jan-24             MANDIRI IDR             1220011559559   sebanyak 40.000Mtr                                       926,672,400   834,840,000   91,832,400                 -          926,672,400
                                                                        FANAH JAYA MAINDO, PT , Pembelian Supreme
                                                                        Kabel Power NYM 3x2.5mm Sebanyak 100 Mtr,
                                                                        Spiral Wrapping Band KS-6 White Sebanyak 50
 362      16-Jan-24             MANDIRI IDR             1220011559559   Pcs                                                        2,217,225     1,997,500     219,725                  -            2,217,225
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Cable Network UTP Cat 6 Sebanyak 6.100 Mtr
 363      16-Jan-24             MANDIRI IDR             1220011559559   untuk Kebutuhan Event HUT Bank Mandiri                    43,623,000    39,300,000    4,323,000                 -           43,623,000
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Cable Netwrok UTP Cat 6 3M With RJ45
                                                                        Connector Sebanyak 150 Unit untuk Kebutuhan
 364      16-Jan-24             MANDIRI IDR             1220011559559   Event HUT Bank Mandiri                                    11,821,500    10,650,000    1,171,500                 -           11,821,500
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian Din
                                                                        Rail Power Supply AC to DC 48V 1.6A Sebanyak
 365      16-Jan-24             MANDIRI IDR             1220011559559   300 Pcs                                                  149,850,000   135,000,000   14,850,000                 -          149,850,000
                                                                        BIBIT , Biaya Pekerjaan Perbaikan FO Cut
                                                                        Distribusi 4 Cluster Puri Gading Jimbaran yang
                                                                        tergores akibat aktivitas rabas pohon sesuai TT
                                                                        I1205-030 (PO Rp.2.425.800,- Potongan PPh
 366      17-Jan-24             SINARMAS IDR             0002999994     21(3%) Rp.72.774,- )                                       2,353,026     2,425,800          -                72,774          2,353,026
                                                                        BIBIT , Biaya Pekerjaan Perbaikan Tiang
                                                                        Distribusi P07_018 yang roboh akibat pondasi
                                                                        tiang yang longsor(PO Rp.1.751.398,- Potongan
 367      17-Jan-24             SINARMAS IDR             0002999994     PPh 21(3%)Rp.52.542,-)                                     1,698,856     1,751,398          -                52,542          1,698,856
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 8
 368      17-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 18
 369      17-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 19
 370      17-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 33
 371      17-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850             7,476,150
Page 28
                                                                                                   Page 25
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 39
 372      17-Jan-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                     7,476,150     6,900,000       759,000           182,850             7,476,150
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perpindahan Pole Jakwifi Impact
                                                                        Pembangunan Rumah site Diskominfo AP RW01
 373      18-Jan-24             MANDIRI IDR             1220011559559   Karang Anyar, Sawah Besar, Jak-Pus                       2,092,426     2,146,077            -                53,651          2,092,426
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perpindahan Pole Impact Permintaan
                                                                        Warga site Diskominfo AP RW05, Penggilingan,
 374      18-Jan-24             MANDIRI IDR             1220011559559   Cakung, Jak-Tim                                          2,146,315     2,201,348            -                55,033          2,146,315
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Miring Impact Pole
                                                                        Miring site Diskominfo AP RW03, Pegangsaan
 375      18-Jan-24             MANDIRI IDR             1220011559559   Dua, Kelapa Gading, Jak-Ut                                 817,975         838,948          -                20,973           817,975
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perpindahan Pole Impact Permintaan
                                                                        Warga site Diskominfo AP RW08, Penggilingan,
 376      18-Jan-24             MANDIRI IDR             1220011559559   Cakung, Jak-Tim                                          2,189,995     2,246,148            -                56,153          2,189,995
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
 377      18-Jan-24             MANDIRI IDR             1220011559559   Tertabrak Truck site Pondok Pinang-010                   1,742,275     1,786,948            -                44,673          1,742,275
                                                                        MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Hit by Car site MP
 378      19-Jan-24             MANDIRI IDR             1220011559559   Cilangkap-001                                            2,539,719     2,324,685       255,715               40,681          2,539,719

                                                                        FIBEART TRANS NETWORK, PT , Uang Muka
                                                                        Beban Umum atas Giro Mundur 60 Hari setelah
                                                                        BAST Pelunasan Pengadaan Tiang 7 Meter PT
 379      19-Jan-24             MANDIRI IDR             1220011559559   Fibeart Trans Network - PO : 1010036298 - Trf          559,440,000   504,000,000     55,440,000                 -          559,440,000
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 380      19-Jan-24             MANDIRI IDR             1220011559559   Selatan - Jl.Masjid Al-Makmur SDA                        6,969,473     6,379,380       701,732           111,639             6,969,473
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 381      19-Jan-24             MANDIRI IDR             1220011559559   Selatan - Jl HR Rasuna Said Dishub                       5,428,228     4,968,630       546,549               86,951          5,428,228
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 382      19-Jan-24             MANDIRI IDR             1220011559559   Selatan - JL Prof Dr.Satrio Dishub                       1,907,505     1,746,000       192,060               30,555          1,907,505
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 383      19-Jan-24             MANDIRI IDR             1220011559559   Selatan - Jl. Binawarga SDA                              6,978,126     6,387,300       702,603           111,777             6,978,126

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 384      19-Jan-24             MANDIRI IDR             1220011559559   Selatan - Jl. Pangeran Antasari Dishub                   5,375,133     4,920,030       541,203               86,100          5,375,133
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 385      19-Jan-24             MANDIRI IDR             1220011559559   Selatan - Jl. Dewi Sartika BPDB                          2,652,023     2,427,480       267,023               42,480          2,652,023
                                                                        BINTANG MAS UTAMA, CV , Biaya Pembelian
                                                                        Claimbing Safety Helmet ,krisbow Safety
                                                                        Hearness,Cable Ties 10 cm dan 35 cm Black dan
                                                                        Cable Scun SC16-8 (PO Rp.5.605.500,- PPN
 386      22-Jan-24             SINARMAS IDR             0002999994     Rp.555.500,-)                                            5,605,500     5,050,000       555,500                  -            5,605,500
Page 29
                                                                                                   Page 26
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                            NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN

                                                                        NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                        Pengadaan Bracket CCTV Bullet Arm Mounting
                                                                        Pole FO sebanyak 20Pcs, Bracket CCTV Bullet
 387      24-Jan-24             MANDIRI IDR             1220011559559   Arm Mounting JPO sebanyak 20Pcs                          22,422,000    20,200,000    2,222,000                 -           22,422,000
                                                                        NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                        Pengadaan Bracket Box CCTV Plate sebanyak
 388      24-Jan-24             MANDIRI IDR             1220011559559   400Pcs                                                   15,984,000    14,400,000    1,584,000                 -           15,984,000
                                                                        PLN PERSERO, PT , Biaya Pasang baru Daya
 389      25-Jan-24               BCA IDR                3193058058     1300VA PLN 5 site Project CCTV Purwakarta                 7,107,500     7,107,500          -                   -            7,107,500
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 58 di Apartement Green
 390      25-Jan-24             MANDIRI IDR             1220011559559   Pramuka                                                   4,116,000     4,200,000          -                84,000          4,116,000

                                                                        ARALIA ARTHA MANDIRI, CV , Pembelian CPU I9-
                                                                        13900KF 125W Intel Processor Core Sebanyak 5
 391      25-Jan-24             MANDIRI IDR             1220011559559   Pcs, VGA GDDR 16 Gb Sebanyak 5 Unit, dll                176,475,021   158,986,505   17,488,516                 -          176,475,021
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 392      26-Jan-24             MANDIRI IDR             1220011559559   96.000 Mtr                                              223,776,000   201,600,000   22,176,000                 -          223,776,000
                                                                        ARALIA ARTHA MANDIRI, CV , Pembelian CPU
                                                                        24 Core 5.8GHZ 36MB Cache 125W Sebanyak
 393      26-Jan-24             MANDIRI IDR             1220011559559   20 Pcs, VGA GDDR 16GB Sebanyak 20 unit, dll             723,197,856   651,529,600   71,668,256                 -          723,197,856
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core With Mesenger sebanyak
 394      30-Jan-24             MANDIRI IDR             1220011559559   72.000Mtr                                               167,832,000   151,200,000   16,632,000                 -          167,832,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 395      30-Jan-24             MANDIRI IDR             1220011559559   108.000 Mtr                                             251,748,000   226,800,000   24,948,000                 -          251,748,000
                                                                        MDT TOTAL SOLUTION, PT , Pembelian SFP SM
 396      1-Feb-24              MANDIRI IDR             1220011559559   1GB 20KM Sebanyak 10 Unit                                 2,164,500     1,950,000     214,500                  -            2,164,500
                                                                        MDT TOTAL SOLUTION, PT , Pembelian SFP SM
 397      1-Feb-24              MANDIRI IDR             1220011559559   1GB 40 KM Sebanyak 10 Unit                                3,607,500     3,250,000     357,500                  -            3,607,500
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Connector Fast Connector SC/APC untuk
                                                                        Kebutuhan IKR Nov-Dec-Jan 2024 Sebanyak
 398      1-Feb-24              MANDIRI IDR             1220011559559   18.000 Pcs                                              149,850,000   135,000,000   14,850,000                 -          149,850,000
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Tanam Final
                                                                        Jakarta Selatan - Lapiazza Summarecon Mall
 399      1-Feb-24              MANDIRI IDR             1220011559559   Kelapa Gading                                            32,332,210    29,594,700    3,255,417          517,907            32,332,210
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 400      1-Feb-24              MANDIRI IDR             1220011559559   Jakarta Selatan - PT Medidata Indonesia                   9,244,517     8,461,800     930,798           148,081             9,244,517
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final
                                                                        Kab.Tangerang - Lestari Mahadibya PT
 401      2-Feb-24              MANDIRI IDR             1220011559559   Explorasa                                                13,472,370    12,591,000    1,385,010          503,640            13,472,370
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final
                                                                        Kab.Tangerang - Uptown Park - Summarecon
 402      2-Feb-24              MANDIRI IDR             1220011559559   Mal Serpong                                              60,892,416    56,908,800    6,259,968         2,276,352           60,892,416
Page 30
                                                                                                     Page 27
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
 403      2-Feb-24              MANDIRI IDR             1220011559559   Pusat - PT Indo Helmet Gallery (Tenant Gallery)            6,302,835     5,890,500     647,955           235,620             6,302,835

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
 404      2-Feb-24              MANDIRI IDR             1220011559559   Pusat - Aditya Irvan Gifachry (Booth Yamaha)               8,855,748     8,276,400     910,404           331,056             8,855,748

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
 405      2-Feb-24              MANDIRI IDR             1220011559559   Pusat - PT Citradimensi Arthali (Tenant PRJ)               9,755,190     9,117,000    1,002,870          364,680             9,755,190
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
                                                                        Pusat - PT Adira Dinamika Multifinance Tbk
 406      2-Feb-24              MANDIRI IDR             1220011559559   (Main Booth)                                              10,656,558     9,959,400    1,095,534          398,376            10,656,558
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
 407      2-Feb-24              MANDIRI IDR             1220011559559   Pusat - PT Liwayway (Tenant PRJ)                           8,387,730     7,839,000     862,290           313,560             8,387,730

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
 408      2-Feb-24              MANDIRI IDR             1220011559559   Pusat - PT Sekar Bumi Tbk (Tenant PRJ)                     7,567,254     7,072,200     777,942           282,888             7,567,254
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
 409      2-Feb-24              MANDIRI IDR             1220011559559   Pusat - PT Enha Cipta Inovasi                             11,011,905    10,291,500    1,132,065          411,660            11,011,905
                                                                        FANAH JAYA MAINDO, PT , Pembelian Adaptor
                                                                        Power Supply AC To DC 12V 2A Sebanyak 3.000
 410      2-Feb-24              MANDIRI IDR             1220011559559   Unit                                                      59,940,000    54,000,000    5,940,000                 -           59,940,000
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Ties Nylon 10cm Black Sebanyak 353.004 Pcs,
                                                                        Cable Ties 30CM Black Outdoor Sebanyak 800
 411      2-Feb-24              MANDIRI IDR             1220011559559   Pcs, dll                                                  13,270,405    11,955,320    1,315,085                 -           13,270,405
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Flag Label L 84MM W 26MM Sebanyak 14.347
 412      2-Feb-24              MANDIRI IDR             1220011559559   Pcs                                                        2,962,081     2,668,542     293,539                  -            2,962,081
                                                                        METALOGIC INFOMITRA, PT , Pembelian NVR
                                                                        24 Channel DHI IVSS7108 2M Dahua Sebanyak 1
 413      2-Feb-24              MANDIRI IDR             1220011559559   Unit                                                      95,515,500    86,050,000    9,465,500                 -           95,515,500
                                                                        TOKOPEDIA, PT , Biaya Pengadaan Material ONT
                                                                        HG8145V5 HUAWEI untuk Kebutuhan ONT
 414      5-Feb-24              MANDIRI IDR             1220011559559   Huawei IKR sebanyak 50 unit                               22,058,000    22,058,000          -                   -           22,058,000
                                                                        TOKOPEDIA, PT , Biaya Pengadaan Material ONT
                                                                        HG8145V5 HUAWEI untuk Kebutuhan ONT
 415      5-Feb-24              MANDIRI IDR             1220011559559   Huawei IKR sebanyak 50 unit                               22,058,000    22,058,000          -                   -           22,058,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 416      6-Feb-24              MANDIRI IDR             1220011559559   61.000 Mtr                                               142,191,000   128,100,000   14,091,000                 -          142,191,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        Drop SM 1 Core with Mesenger sebanyak
 417      6-Feb-24              MANDIRI IDR             1220011559559   156.000 Mtr                                              363,636,000   327,600,000   36,036,000                 -          363,636,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 59 di Apartement Green
 418      6-Feb-24              MANDIRI IDR             1220011559559   Pramuka                                                    4,116,000     4,200,000          -                84,000          4,116,000
Page 31
                                                                                                     Page 28
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK     DPP            PPN              PPh             NET DIBAYARKAN
                                                                        KHARISMA MAKMUR JAYA, PT , Pembelian
                                                                        Network Card SFP+ 1Port 10GBPS Sebanyak 7
 419      6-Feb-24              MANDIRI IDR             1220011559559   Unit                                                        8,547,000      7,700,000       847,000                 -            8,547,000

                                                                        ARALIA ARTHA MANDIRI, CV , Pembelian CPU
                                                                        24 Core 5.8 GHZ 36MB Cache 125W Sebanyak
 420      6-Feb-24              MANDIRI IDR             1220011559559   20 Pcs, VGA GDDR6 16 Gb Sebanyak 20 Unit, dll             709,600,023    639,279,300     70,320,723                -          709,600,023
                                                                        BIBIT , Biaya Pekerjaan untuk Tenant White
                                                                        Rock karena ada aktivitas pemasangan paving
                                                                        dan drilling di area Pantai Melasti sesuai TT.
                                                                        I1216-015 dan Link CCTV KUT-025(PO
                                                                        Rp.3.463.800,- Potongan PPh 21(3%)
 421      7-Feb-24              SINARMAS IDR             0002999994     Rp.103.914,-)                                               3,359,886      3,463,800            -           103,914             3,359,886

                                                                        WAHANA MANDIRI, TOKO , Pembelian Fiber
                                                                        Optic Tools Sebanyak 5 Unit untuk Kebutuhan
 422      7-Feb-24              MANDIRI IDR             1220011559559   Penambahan tim Residential FTTX                            13,320,000     12,000,000      1,320,000                -           13,320,000
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord Simplex LC-UPC/LC-UPC 5 Mtr
                                                                        Sebanyak 150 Pcs, Patchcord Simplex LC-
 423      7-Feb-24              MANDIRI IDR             1220011559559   UPC/SC-UPC 5 Mtr Sebanyak 150 Pcs                           6,826,500      6,150,000       676,500                 -            6,826,500

                                                                        ACCESS LINTAS SOLUSI, PT , Pembelian Router
 424      7-Feb-24              MANDIRI IDR             1220011559559   RB4011 IGS+RM Mikrotik Sebanyak 1 Pcs                       3,579,750      3,225,000       354,750                 -            3,579,750

                                                                        ACCESS LINTAS SOLUSI, PT , Pembelian Router
 425      7-Feb-24              MANDIRI IDR             1220011559559   RB4011 IGS+RM Mikrotik Sebanyak 1 Pcs                       3,579,750      3,225,000       354,750                 -            3,579,750
                                                                        ACCESS LINTAS SOLUSI, PT , Pembelian Router
                                                                        RB4011 IGS+RM Mikrotik Sebanyak 1
                                                                        Pcs,Router RB4011 IGS+RM Mikrotik Sebanyak
 426      7-Feb-24              MANDIRI IDR             1220011559559   1 Pcs untuk Stock Q4                                        7,159,500      6,450,000       709,500                 -            7,159,500
                                                                        MACRO TREND TECHNOLOGY, PT , Pembelian
                                                                        PC Power Supply Unit 1.000W Sebanyak 7 Unit
 427      7-Feb-24              MANDIRI IDR             1220011559559   untuk Kebutuhan CCTV 200 Titik                             22,952,580     20,678,000      2,274,580                -           22,952,580
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Material
                                                                        Cable Optical SM ADSS 48 Core sebanyak
 428      9-Feb-24              MANDIRI IDR             1220011559559   20.000Mtr                                                 229,770,000    207,000,000     22,770,000                -          229,770,000
                                                                        TOKOPEDIA, PT , Biaya Pembelian ONT
                                                                        HG8145V5 HUAWEI Kebutuhan ONT Huawei
 429      9-Feb-24              MANDIRI IDR             1220011559559   IKR Stok Januari 2024 sebanyak 100unit                     44,122,000     44,122,000            -                  -           44,122,000
                                                                        ALPHA CIKUPA MAKMUR, PT , Uang Muka
                                                                        Beban Umum atas Pembayaran Pengadaan
                                                                        Material Subduct HDPE untuk Kebutuhan CCTV
                                                                        204 titik Diskominfo Batch 3 - PO:1010040472 -
 430      9-Feb-24              MANDIRI IDR             1220011559559   Trf                                                        69,819,000     69,819,000            -                  -           69,819,000
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                        Mini OLT sebanyak 25set (Pelunasan oleh
 431      12-Feb-24             VICTORIA IDR             0880003577     SKBDN 134SKBDN/VII/23)                                  1,666,554,437   1,501,400,394   165,154,043                -        1,666,554,437
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Tanam Final
 432      15-Feb-24             MANDIRI IDR             1220011559559   Jakarta Selatan JPO Amaris Dishub                           4,597,662      4,208,386       462,922              73,646          4,597,662
                                                                        JARING INFRASTRUKTUR NASIONAL, PT ,
                                                                        Tagihan 90% atas Pekerjaan Penarikan Kabel
                                                                        Udara Final Jakarta Barat - Global Bintang Timur
 433      15-Feb-24             MANDIRI IDR             1220011559559   Ekspress (Gudang Kembangan)                                 5,500,301      5,034,600       553,806              88,105          5,500,301
Page 32
                                                                                                    Page 29
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        JARING INFRASTRUKTUR NASIONAL, PT ,
                                                                        Tagihan Retensi 10% atas Pekerjaan Penarikan
                                                                        Kabel Udara Final Jakarta Barat - Global Bintang
 434      15-Feb-24             MANDIRI IDR             1220011559559   Timur Ekspress (Gudang Kembangan)                             611,145         559,400         61,534             9,789           611,145
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        SM Drop 1 Core With Messenger sebanyak
 435      16-Feb-24             MANDIRI IDR             1220011559559   192.000 Mtr                                               340,992,000   307,200,000     33,792,000                 -          340,992,000

                                                                        NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                        Pengadaan Bracket CCTV Bullet Arm Mounting
                                                                        Pole FO sebanyak 60Pcs, Bracket CCTV Bullet
 436      16-Feb-24             MANDIRI IDR             1220011559559   Arm Mounting JPO sebanyak 20Pcs                            37,962,000    34,200,000      3,762,000                 -           37,962,000
                                                                        NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                        Pengadaan Bracket CCTV Bullet Arm Mounting
 437      16-Feb-24             MANDIRI IDR             1220011559559   Pole FO sebanyak 30Pcs                                     11,655,000    10,500,000      1,155,000                 -           11,655,000
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord Simplex LC-UPC/SC-UPC 3 Mtr
 438      19-Feb-24             MANDIRI IDR             1220011559559   Sebanyak 800 Pcs                                           12,432,000    11,200,000      1,232,000                 -           12,432,000
                                                                        WAHANA MANDIRI, TOKO , Pembelian Fiber
                                                                        Optic Tools Sebanyak 6 Unit untuk Kebutuhan
 439      19-Feb-24             MANDIRI IDR             1220011559559   Penambahan tim Fttx Ops                                    15,984,000    14,400,000      1,584,000                 -           15,984,000

                                                                        OPTICAL FIBER INDONESIA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Udara Final
 440      19-Feb-24             MANDIRI IDR             1220011559559   Kota Bekasi - Summarecon Mall Bekasi                        1,831,577     1,676,500       184,415               29,338          1,831,577
                                                                        TOKOPEDIA, PT , Biaya Pembelian ONT ZXHN
 441      19-Feb-24             MANDIRI IDR             1220011559559   F670L ZTE 45 Unit - Kebutuhan IKR                          19,721,975    19,721,975              -                 -           19,721,975
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Vandalisme site MP Tanjung
 442      19-Feb-24             MANDIRI IDR             1220011559559   Barat-001                                                   1,280,515     1,313,348              -              32,833          1,280,515
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Pekerjaan SDA site MP Ulujami-
 443      19-Feb-24             MANDIRI IDR             1220011559559   001                                                         2,321,620     2,381,148              -              59,528          2,321,620
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Hit by Truck site MP Kampung
 444      19-Feb-24             MANDIRI IDR             1220011559559   Melayu-001                                                  1,235,275     1,266,948              -              31,673          1,235,275
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Impact SDA Cluster Kebon
 445      19-Feb-24             MANDIRI IDR             1220011559559   Jeruk RW03 site Kebon Jeruk-029                             1,385,815     1,421,348              -              35,533          1,385,815
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemindahan FAT 01-011 Cluster Duri Kepa
 446      19-Feb-24             MANDIRI IDR             1220011559559   RW11 site Duri Kepa-017                                     1,364,755     1,399,748              -              34,993          1,364,755
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut impact Hit by Truck site MP Penggilingan-
 447      19-Feb-24             MANDIRI IDR             1220011559559   001                                                         1,252,435     1,284,548              -              32,113          1,252,435
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Patah Impact Tertabrak Truck
 448      19-Feb-24             MANDIRI IDR             1220011559559   site MP Kelapa Gading Barat-001                             2,236,015     2,293,348              -              57,333          2,236,015
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut impact Hit by Truck site MP Penggilingan-
 449      19-Feb-24             MANDIRI IDR             1220011559559   001                                                         1,235,275     1,266,948              -              31,673          1,235,275
                                                                        DJAJA LISTRIK, PT , Pembelian Fusion Splicer
                                                                        (Alat Sambung Kabel FO) Sebanyak 3 Unit, Tools
                                                                        Crimping Tool RG6 3 Pcs, Converter USB Type-A
 450      20-Feb-24             MANDIRI IDR             1220011559559   DB9 Sebanyak 2 Pcs                                         65,026,686    58,582,600      6,444,086                 -           65,026,686
Page 33
                                                                                                    Page 30
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                           NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        DJAJA LISTRIK, PT , Pembelian Power Plug Type
                                                                        C untuk Kebutuhan CCTV 250 Titik Diskominfo
 451      20-Feb-24             MANDIRI IDR             1220011559559   Batch 3 Sebanyak 120 Unit                                 1,265,400    1,140,000     125,400                  -            1,265,400
                                                                        DIAN MUSTIKA AGUNG, PT , Pembelian Cable
                                                                        Network Cat 5E Sebanyak 6.100 Mtr untuk
 452      20-Feb-24             MANDIRI IDR             1220011559559   Kebutuhan Additional Q4                                  60,606,000   54,600,000    6,006,000                 -           60,606,000
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 9
 453      20-Feb-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150    6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 11
 454      20-Feb-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150    6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 12
 455      20-Feb-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150    6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 14
 456      20-Feb-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150    6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 15
 457      20-Feb-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150    6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 29
 458      20-Feb-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150    6,900,000     759,000           182,850             7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 30
 459      20-Feb-24             MANDIRI IDR             1220011559559   untuk 30 Sales Order                                      7,476,150    6,900,000     759,000           182,850             7,476,150

                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Restorasi Kabel Feeder Apartement
 460      20-Feb-24             MANDIRI IDR             1220011559559   Kensington MP Kelapa Gading Barat-001                     5,717,155    5,863,748          -            146,593             5,717,155
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Terlindas Kendaraan
 461      20-Feb-24             MANDIRI IDR             1220011559559   site Meruyung-001                                         2,517,595    2,582,148          -                64,553          2,517,595
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Feeder Puri Botanical Bad Kabel site
 462      20-Feb-24             MANDIRI IDR             1220011559559   MP Meruya Selatan-001                                     2,257,855    2,315,748          -                57,893          2,257,855
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang & FAT Cluster
 463      20-Feb-24             MANDIRI IDR             1220011559559   Cibubur RW01 site MCP Cibubur-015                         1,570,285    1,610,548          -                40,263          1,570,285

                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pengecekan Kondisi Tiang/Jalur Kabel
 464      20-Feb-24             MANDIRI IDR             1220011559559   Depan Komplek Dosen UI site MCP Bintaro-003               2,601,835    2,668,548          -                66,713          2,601,835
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan FAT site Kembangan
 465      20-Feb-24             MANDIRI IDR             1220011559559   Utara-015                                                 1,694,110    1,737,548          -                43,438          1,694,110
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Pemutusan oleh
 466      20-Feb-24             MANDIRI IDR             1220011559559   Binamarga site MP Kapuk-001                               1,618,645    1,660,148          -                41,503          1,618,645
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Tertabrak Truck site
 467      20-Feb-24             MANDIRI IDR             1220011559559   MP Cideng-002                                             1,196,275    1,226,948          -                30,673          1,196,275
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Galian Saluran Air
 468      20-Feb-24             MANDIRI IDR             1220011559559   Oleh Alat Berat (SDA) site MP Ulujami-001                 1,824,955    1,871,748          -                46,793          1,824,955
Page 34
                                                                                                   Page 31
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                            NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel Landai dan Tiang
 469      20-Feb-24             MANDIRI IDR             1220011559559   Miring hasil Patroli site MP Cipete Utara-001             1,495,015     1,533,348           -               38,333          1,495,015
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel Landai Cluster
 470      20-Feb-24             MANDIRI IDR             1220011559559   Cipulir RW03 site MP Cipulir-002                          2,945,815     3,021,348           -               75,533          2,945,815
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Tiang dan Kabel Landai
 471      20-Feb-24             MANDIRI IDR             1220011559559   site MP Utan Kayu Selatan-001                             1,277,395     1,310,148           -               32,753          1,277,395
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Kabel dan Tiang site MP
 472      20-Feb-24             MANDIRI IDR             1220011559559   Kampung Melayu-001                                        1,074,595     1,102,148           -               27,553          1,074,595
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak Truck
 473      20-Feb-24             MANDIRI IDR             1220011559559   MP Penggilingan-001                                       1,874,875     1,922,948           -               48,073          1,874,875
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Kabel Crossing Impact
 474      20-Feb-24             MANDIRI IDR             1220011559559   Patroli Crossing MP Ciracas-001                           1,869,415     1,917,348           -               47,933          1,869,415
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak Truck
 475      20-Feb-24             MANDIRI IDR             1220011559559   MP Cipinang Muara-001                                     1,643,995     1,686,148           -               42,153          1,643,995
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Tertabrak Truck
 476      20-Feb-24             MANDIRI IDR             1220011559559   site MP Kalideres-001                                     1,628,395     1,670,148           -               41,753          1,628,395
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Kabel Landai Cluster Puri
 477      20-Feb-24             MANDIRI IDR             1220011559559   Indah site Kembangan Selatan-011                          2,153,335     2,208,548           -               55,213          2,153,335
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Kabel Landai dan Tiang
                                                                        Cluster Karet Tengsin RW5 site MP Penjernihan-
 478      20-Feb-24             MANDIRI IDR             1220011559559   001                                                       2,047,255     2,099,748           -               52,493          2,047,255
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact di Putus Oknum di
 479      20-Feb-24             MANDIRI IDR             1220011559559   Beberapa Titik site Marga Jaya-011                        1,734,475     1,778,948           -               44,473          1,734,475
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Tertabrak Truck site
 480      20-Feb-24             MANDIRI IDR             1220011559559   MP Kayu Putih-001                                         1,881,895     1,930,148           -               48,253          1,881,895
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Kabel dan Tiang Cluster Cipinang
 481      20-Feb-24             MANDIRI IDR             1220011559559   Cempedak site Kampung Melayu-001                          1,879,555     1,927,748           -               48,193          1,879,555
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel Cilangkap RW05 site
 482      20-Feb-24             MANDIRI IDR             1220011559559   Cilangkap-010                                             1,213,435     1,244,548           -               31,113          1,213,435
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Tertabrak Truck site
 483      20-Feb-24             MANDIRI IDR             1220011559559   MP Cilangkap-001                                          1,280,515     1,313,348           -               32,833          1,280,515

                                                                        COMMUNICATION CABLE SYSTEMS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
 484      23-Feb-24             MANDIRI IDR             1220011559559   SM ADSS 24 Core sebanyak 130.000 Mtr                  1,038,960,000   936,000,000   102,960,000                -        1,038,960,000
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        SM Drop 1 Core With Messenger sebanyak
 485      23-Feb-24             MANDIRI IDR             1220011559559   84.000 Mtr                                              149,184,000   134,400,000    14,784,000                -          149,184,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 60 di Apartement Green
 486      23-Feb-24             MANDIRI IDR             1220011559559   Pramuka                                                   4,116,000     4,200,000           -               84,000          4,116,000
Page 35
                                                                                                     Page 32
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        MANNA ABADI SEJAHTERA, PT , Tagihan 100%
                                                                        atas Pekerjaan Relokasi KU ke KT akibat Bahu
 487      23-Feb-24             MANDIRI IDR             1220011559559   Jalan yang Longsor site Jl. Jembatan Tiga Raya              8,622,010     7,892,000       868,120           138,110             8,622,010
                                                                        I NENGAH SUSASTRA , Biaya Pekerjaan
                                                                        Activation For New Services Corporate Delivery
                                                                        818595 PT. Tirta Tegal Group (Golden Malabar)
                                                                        Discovery Shopping Mall (DSM) (PO
                                                                        Rp.1.660.000,- Potongan PPh 21(2.5%)
 488      26-Feb-24             SINARMAS IDR             0002999994     Rp.41.500,- )                                               1,618,500     1,660,000            -                41,500          1,618,500
                                                                        I NENGAH SUSASTRA , Biaya Pekerjaan
                                                                        Activation For New Services Corporate Delivery
                                                                        818695 AMC Asia Red Hat Event 2024 Bali Nusa
                                                                        Dua Convention Centre (BNDCC)(PO
                                                                        Rp.5.242.000,- Potongan PPh 21(2.5%)
 489      26-Feb-24             SINARMAS IDR             0002999994     Rp.131.050,- )                                              5,110,950     5,242,000            -            131,050             5,110,950
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 61 di Apartement Green
 490      27-Feb-24             MANDIRI IDR             1220011559559   Pramuka                                                     4,116,000     4,200,000            -                84,000          4,116,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 62 di Apartement Green
 491      27-Feb-24             MANDIRI IDR             1220011559559   Pramuka                                                     4,116,000     4,200,000            -                84,000          4,116,000
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Dismantle dan Relokasi 5 Access
                                                                        Point Jakarta Utara - Akses Site - Hutan Kota
 492      28-Feb-24             MANDIRI IDR             1220011559559   Penjaringan                                                 5,843,947     5,349,150       588,407               93,610          5,843,947
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Jakarta Pusat - Akses Site - Lapangan Benteng
 493      28-Feb-24             MANDIRI IDR             1220011559559   Utara Dishub                                                4,173,891     4,287,510            -            113,619             4,173,891
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Pusat - Akses Site - Jl.
 494      28-Feb-24             MANDIRI IDR             1220011559559   Pangeran Jayakarta Dishub                                     390,131         400,750          -                10,619           390,131
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Pusat - Akses Site -
 495      28-Feb-24             MANDIRI IDR             1220011559559   Lapangan Benteng Utara Dishub                                 463,766         476,390          -                12,624           463,766
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
 496      1-Mar-24              MANDIRI IDR             1220011559559   Pemotong Fiber Optik FC-6S Sebanyak 2 Unit                  1,609,500     1,450,000       159,500                  -            1,609,500

                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Kabel LAN UTP Cat-6 Sebanyak 610 Mtr, Power
 497      1-Mar-24              MANDIRI IDR             1220011559559   Outlet Strip 6 Port Sebanyak 10 Unit, dll                  29,947,800    26,980,000      2,967,800                 -           29,947,800

                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , Tagihan Pelunasan 100% atas Pengadaan
                                                                        Nokia Wifi Beacon Dual Band AC1200 2XGE EU
 498      1-Mar-24              MANDIRI IDR             1220011559559   Plug HA-020W-B sebanyak 500 Unit                          263,003,400   236,940,000     26,063,400                 -          263,003,400
                                                                        SYMMETRY CONTRACTING INDONESIA, PT ,
                                                                        Tagihan 90% atas Pekerjaan Penarikan Kabel
                                                                        Udara Tanam Final Jakarta Pusat - Event
 499      1-Mar-24              MANDIRI IDR             1220011559559   Upacara Hari Lahir Pancasila                                9,883,146     9,121,500      1,003,365          241,719             9,883,146
                                                                        DIAN MUSTIKA AGUNG, PT , Pembelian Clamp C-
 500      1-Mar-24              MANDIRI IDR             1220011559559   Clamp 6mm Sebanyak 337.102 Pcs                             26,192,825    23,597,140      2,595,685                 -           26,192,825
                                                                        SUNICODATA COMININDO, PT , Pembelian
 501      1-Mar-24              MANDIRI IDR             1220011559559   Switch S4600 10P SI DCN Sebanyak 50 Unit                  102,675,000    92,500,000     10,175,000                 -          102,675,000
Page 36
                                                                                                    Page 33
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
 502      1-Mar-24              MANDIRI IDR             1220011559559   Router RB411IGS+RM Mikrotik Sebanyak 1 Pcs                  3,657,450     3,295,000       362,450                  -            3,657,450
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
 503      1-Mar-24              MANDIRI IDR             1220011559559   Cable Network UTP Cat 6 Sebanyak 6.100 Mtr                 43,623,000    39,300,000      4,323,000                 -           43,623,000
                                                                        FANAH JAYA MAINDO, PT , Pembelian Kabel
                                                                        LAN UTP Belden Cat 5e 1000 FT 1583 A
                                                                        Sebanyak 13725 Mtr, Cable Ramp Protector 2
                                                                        Channel L 970MM W 240MM H 45MM
 504      4-Mar-24              MANDIRI IDR             1220011559559   Sebanyak 231 Unit                                         121,852,192   109,776,750     12,075,442                 -          121,852,192
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        SM Drop 1 Core with Messenger sebanyak
 505      4-Mar-24              MANDIRI IDR             1220011559559   144.000                                                   255,744,000   230,400,000     25,344,000                 -          255,744,000
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan Mini OLT Nokia
 506      4-Mar-24              MANDIRI IDR             1220011559559   sebanyak 26 Unit                                          135,588,540   135,588,540              -                 -          135,588,540
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Jl. Mangga Dua
 507      4-Mar-24              MANDIRI IDR             1220011559559   Raya Dishub                                                 5,690,756     5,845,666              -          154,910             5,690,756
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Monas Satpol
 508      4-Mar-24              MANDIRI IDR             1220011559559   PP                                                          8,056,638     8,275,950              -          219,312             8,056,638
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Taman
 509      4-Mar-24              MANDIRI IDR             1220011559559   Lapangan Banteng Dishub                                     4,017,310     4,126,666              -          109,356             4,017,310
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Jl. Proklamasi
 510      4-Mar-24              MANDIRI IDR             1220011559559   Dishub                                                      4,707,716     4,835,866              -          128,150             4,707,716

                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
 511      4-Mar-24              MANDIRI IDR             1220011559559   Final Jakarta Pusat - PT Liwayway (Tenant PRJ)                931,970         871,000         95,810            34,840           931,970
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Jakarta Pusat - PT Adira Dinamika
 512      4-Mar-24              MANDIRI IDR             1220011559559   Multifinance TBK (Main Booth)                               1,184,062     1,106,600       121,726               44,264          1,184,062
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
 513      4-Mar-24              MANDIRI IDR             1220011559559   Final Jakarta Pusat - PT Enha Cipta Inovasi                 1,223,545     1,143,500       125,785               45,740          1,223,545
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
 514      4-Mar-24              MANDIRI IDR             1220011559559   Final Jakarta Pusat - Java Jazz Festival                   12,425,375    11,612,500      1,277,375          464,500            12,425,375
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Jakarta Pusat - Aditya Irvan Gifachry
 515      4-Mar-24              MANDIRI IDR             1220011559559   (Booth Yamaha)                                                983,972         919,600     101,156               36,784           983,972
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Jakarta Pusat - PT Sekar Bumi TBK (Tenant
 516      4-Mar-24              MANDIRI IDR             1220011559559   PRJ)                                                          840,806         785,800         86,438            31,432           840,806
Page 37
                                                                                                   Page 34
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                               NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Jakarta Timur - Perum Damri Cabang
 517      4-Mar-24              MANDIRI IDR             1220011559559   Bandara Soekarno Hatta                                       646,494         604,200         66,462            24,168           646,494
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Kab.Tangerang - Lestari Mahadibya PT
 518      4-Mar-24              MANDIRI IDR             1220011559559   Explorasa                                                  1,496,930    1,399,000        153,890               55,960          1,496,930
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Kab.Tangerang - Uptown
 519      4-Mar-24              MANDIRI IDR             1220011559559   Park_Summarecon Mal Serpong                                6,765,824    6,323,200        695,552           252,928             6,765,824
                                                                        SANTA MULTI SEMESTA, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Jakarta Pusat - PT Citradimensi Arthali
 520      4-Mar-24              MANDIRI IDR             1220011559559   (Tenant PRJ)                                               1,083,910    1,013,000        111,430               40,520          1,083,910
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
                                                                        Selatan - Tebet Eco Park 5 AP (Relokasi 5 AP
 521      4-Mar-24              MANDIRI IDR             1220011559559   Hutan Kota Penjaringan)                                   88,485,997   82,697,193       9,096,691         3,307,887           88,485,997
                                                                        FANAH JAYA MAINDO, PT , Pembelian
                                                                        Connector Fast Connector SC/APC Sebanyak
 522      4-Mar-24              MANDIRI IDR             1220011559559   1.000 Pcs                                                  8,769,000    7,900,000        869,000                  -            8,769,000
                                                                        FANAH JAYA MAINDO, PT , Pembelian Adaptor
                                                                        Power Supply AC to DC 12V 2A Sebanyak 1.883
 523      4-Mar-24              MANDIRI IDR             1220011559559   Unit                                                      31,351,950   28,245,000       3,106,950                 -           31,351,950
                                                                        ASIA TELCO NETWORKS, PT , Pembelian Switch
                                                                        10G SFP BIDI 10KM 1271NM Sebanyak 10 Unit,
                                                                        Switch 10G SFP BIDI 10KM 1331NM Sebanyak
 524      4-Mar-24              MANDIRI IDR             1220011559559   10 Unit                                                   20,868,000   18,800,000       2,068,000                 -           20,868,000
                                                                        ASIA TELCO NETWORKS, PT , Pembelian SFP
                                                                        10G BX40 U Sebanyak 25 Unit, SFP 10GBX40 D
 525      4-Mar-24              MANDIRI IDR             1220011559559   Sebanyak 25 Unit                                          56,887,500   51,250,000       5,637,500                 -           56,887,500

                                                                        METALOGIC INFOMITRA, PT , Pembelian Lock
                                                                        Padlock Jacket 40MM Sebanyak 500 Pcs untuk
 526      4-Mar-24              MANDIRI IDR             1220011559559   Kebutuhan CCTV 250 titik Diskominfo Batch 3               22,755,000   20,500,000       2,255,000                 -           22,755,000

                                                                        METALOGIC INFOMITRA, PT , Pembelian Radio
                                                                        R5AC Ubiquiti Sebanyak 18 Unit, Rocket Dish 5G-
 527      4-Mar-24              MANDIRI IDR             1220011559559   30dBi Light Weight Sebanyak 18 Unit                       69,390,540   62,514,000       6,876,540                 -           69,390,540
                                                                        MDT TOTAL SOLUTION, PT , Pembelian Joint
 528      4-Mar-24              MANDIRI IDR             1220011559559   Closure 24 Core Sebanyak 20 Unit                           6,216,000    5,600,000        616,000                  -            6,216,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
 529      4-Mar-24              MANDIRI IDR             1220011559559   Optical Laser Tester Sebanyak 3 Unit                         832,500         750,000         82,500               -             832,500
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        OTB Indoor 1U 24 Core SC/UPC Sebanyak 35
 530      4-Mar-24              MANDIRI IDR             1220011559559   Unit                                                      21,367,500   19,250,000       2,117,500                 -           21,367,500
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Relokasi Tiang Cluster Tangkapan Jaya RW04
                                                                        Impact Pelebaran Akses Toll Desari site MP
 531      4-Mar-24              MANDIRI IDR             1220011559559   Mampang-008                                                1,200,955    1,231,748               -              30,793          1,200,955
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang dan Kabel di Cluster Puri Indah
 532      4-Mar-24              MANDIRI IDR             1220011559559   site Kembangan Selatan-011                                 1,275,835    1,308,548               -              32,713          1,275,835
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring, Kabel Landai dan
 533      4-Mar-24              MANDIRI IDR             1220011559559   Aksessories lepas site MP Bangka-001                       1,253,995    1,286,148               -              32,153          1,253,995
Page 38
                                                                                                      Page 35
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Kabel Landai dan Aksessories Lepas
 534      4-Mar-24              MANDIRI IDR             1220011559559   site MP Sunter Jaya-001                                       1,021,555     1,047,748          -                26,193          1,021,555
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Kabel Tertindas Alat Berat Proyek
 535      4-Mar-24              MANDIRI IDR             1220011559559   Menara Citicon                                                4,590,835     4,708,548          -            117,713             4,590,835
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site
                                                                        Diskominfo AP RW10, Semanan, Kalideres, Jak-
 536      4-Mar-24              MANDIRI IDR             1220011559559   Bar                                                           2,604,043     2,433,685     267,705               97,347          2,604,043

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Box Panel Impact Survey
 537      4-Mar-24              MANDIRI IDR             1220011559559   Perpindahan Box Panel site MCP Johar Baru-007                 1,890,795     1,767,097     194,381               70,683          1,890,795
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kabel Landai site MP
 538      4-Mar-24              MANDIRI IDR             1220011559559   Bangka-001                                                    2,827,673     2,642,685     290,695           105,707             2,827,673
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabal FO Final as
                                                                        Build Jakarta Barat - Akses Site - Komplek Joglo
 539      7-Mar-24              MANDIRI IDR             1220011559559   Baru-C01                                                      9,708,774     8,960,566     985,662           237,454             9,708,774
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                        Build Jakarta Barat - Akses Site - Jl.Lingkungan
 540      7-Mar-24              MANDIRI IDR             1220011559559   C01 - CCTV                                                   11,786,136    10,877,836    1,196,562          288,262            11,786,136
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                        Build Jakarta Barat - Akses Site - Kavling
 541      7-Mar-24              MANDIRI IDR             1220011559559   Hankam Joglo SDA                                              5,060,736     4,670,730     513,780           123,774             5,060,736
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                        Build Jakarta Barat - Akses Site - Jl. Nurul
 542      7-Mar-24              MANDIRI IDR             1220011559559   Muslimin-C01                                                 12,680,370    11,606,746    1,276,742          203,118            12,680,370

                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel FO Final as
 543      7-Mar-24              MANDIRI IDR             1220011559559   Build Jakarta Barat - Akses Site - Jl. Kartika-C01            6,118,864     5,600,790     616,087               98,013          6,118,864
                                                                        BERCA HARDAYAPERKASA, PT , Pembelian Joint
                                                                        Closure Inline NWC 24 Core Full Set Sebanyak 3
                                                                        Unit, Stabiliser 1000 VA SMRT Svc AVR 1.000N
 544      12-Mar-24             MANDIRI IDR             1220011559559   Sebanyak 3 Unit                                               4,619,709     4,161,900     457,809                  -            4,619,709
                                                                        DJAJA LISTRIK, PT , Pembelian Pipe PVC 20MM
                                                                        White Sebanyak 100 Btg untuk Kebutuhan
 545      12-Mar-24             MANDIRI IDR             1220011559559   Stock Jan 2024                                                1,221,000     1,100,000     121,000                  -            1,221,000

                                                                        INTEGRA MITRA SOLUSI, PT , Uang Muka Beban
                                                                        Umum atas Pembayaran DP 30% Pengadaan
                                                                        Material NVR Dahua untuk Kebutuhan Kab
                                                                        Purwakarta, Kab Badung, KabGianyar, Kab
 546      12-Mar-24             MANDIRI IDR             1220011559559   Klungkung - PO: 1010040675 - Trf                            136,363,500   136,363,500          -                   -          136,363,500
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                        Mini OLT sebanyak 25set (Pelunasan oleh
 547      13-Mar-24             VICTORIA IDR             0880003577     SKBDN 134SKBDN/VII/23)                                      847,350,668   763,378,981   83,971,687                 -          847,350,668
Page 39
                                                                                                       Page 36
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                     NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                        NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        PLN PERSERO, PT , Uang Muka Beban Umum
                                                                        atas Pengajuan (Biaya Registrasi dan Biaya
                                                                        Admin) Percepatan Pembayaran PLN Project
                                                                        Pekerjaan CCTV Jakarta 204 Site by Cash
 548      13-Mar-24             MANDIRI IDR             1220011559559   Advance - Trf                                                   12,793,500    12,793,500            -                   -           12,793,500
                                                                        PLN PERSERO, PT , Uang Muka Beban Umum
                                                                        atas Pengajuan (Biaya Registrasi dan Biaya
                                                                        Admin) Percepatan Pembayaran PLN Project
                                                                        Pekerjaan CCTV Jakarta 204 Site by Cash
 549      13-Mar-24             MANDIRI IDR             1220011559559   Advance - Trf                                                    1,421,500     1,421,500            -                   -            1,421,500

                                                                        TOKOPEDIA, PT , Biaya Pengadaan Material 100
                                                                        unit ONT HUAWEI HG8145V5 untuk Kebutuhan
 550      13-Mar-24             MANDIRI IDR             1220011559559   ONT Huawei IKR Stok Februari 2024                               44,122,000    44,122,000            -                   -           44,122,000
                                                                        BERCA HARDAYAPERKASA, PT , Tagihan
                                                                        Pelunasan 70% atas Pengadaan HPE Proliant
                                                                        DL300 Gen10 Plus sebanyak 19 Unit + Jasa
 551      14-Mar-24             MANDIRI IDR             1220011559559   Instalasi                                                      718,506,600   649,460,000     71,440,600         2,394,000          718,506,600
                                                                        BIBIT , Biaya Pekerjaan Perpindahan Jalur Kabel
                                                                        FO Link Kantor Camat Kuta Utara karena
                                                                        renovasi Gedung (PO Rp.1.141.173,- Potongan
 552      15-Mar-24             MANDIRI IDR             1220011559559   PPh 21(2.5%) Rp.28.529,-                                         1,112,644     1,141,173            -                28,529          1,112,644
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        SM Drop 1 Core with Messenger sebanyak
 553      15-Mar-24             MANDIRI IDR             1220011559559   240.000                                                        426,240,000   384,000,000     42,240,000                 -          426,240,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 64 di Apartement Green
 554      15-Mar-24             MANDIRI IDR             1220011559559   Pramuka                                                          4,116,000     4,200,000            -                84,000          4,116,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Dismantle
                                                                        Perangkat Balifiber di Apartement Green
                                                                        Pramuka Tower 5, 6 dan 7 periode 18 Okt 2023 -
 555      15-Mar-24             MANDIRI IDR             1220011559559   30 Jan 2024 (Batch 1)                                              980,000     1,000,000            -                20,000           980,000
                                                                        SKILL GLOBALINDO SUKSES, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Kota Bandung - Balai Pertemuan Bumi
 556      15-Mar-24             MANDIRI IDR             1220011559559   Sangkuriang                                                     20,499,780    18,764,100      2,064,051          328,371            20,499,780
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Kota Jakarta Pusat - Akses Site -
 557      15-Mar-24             MANDIRI IDR             1220011559559   Taman Lapangan Banteng Dishub                                      446,368         458,518          -                12,150           446,368
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Kota Jakarta Pusat - Akses Site - Jl.
 558      15-Mar-24             MANDIRI IDR             1220011559559   Mangga Dua Raya Dishub                                             632,306         649,518          -                17,212           632,306
                                                                        BERANI INOVASI INDONESIA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Kota Jakarta Pusat - Akses Site -
 559      15-Mar-24             MANDIRI IDR             1220011559559   Monas Satpol PP                                                    895,182         919,550          -                24,368           895,182
                                                                        TADYA MANDIRI SINERGI, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 560      15-Mar-24             MANDIRI IDR             1220011559559   Selatan - PT Sansaine Exindo                                     7,260,057     6,785,100       746,361           271,404             7,260,057
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                        Build Jakarta Barat - Akses Site - Jl. Strategi Raya-
 561      15-Mar-24             MANDIRI IDR             1220011559559   C01                                                              5,998,907     5,490,990       604,009               96,092          5,998,907
Page 40
                                                                                                       Page 37
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                   NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
 562      15-Mar-24             MANDIRI IDR             1220011559559   Udara Final Kota Bandung - CCTV 30 titik                      11,506,697    10,532,445      1,158,569          184,317            11,506,697
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel
 563      15-Mar-24             MANDIRI IDR             1220011559559   Udara Final Interkoneksi MSN Balitower                           181,068         165,737         18,231             2,900           181,068
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Barat - Akses Site - Jl.
 564      15-Mar-24             MANDIRI IDR             1220011559559   Nurul Muslimin-C01                                             1,408,930     1,289,638       141,860               22,568          1,408,930
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Barat - Akses Site - Jl.
 565      15-Mar-24             MANDIRI IDR             1220011559559   Kartika-C01                                                      679,874         622,310         68,454            10,890           679,874
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Barat - Akses Site - Jl.
 566      15-Mar-24             MANDIRI IDR             1220011559559   Strategi Raya-C01                                                666,546         610,110         67,112            10,676           666,546
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Barat - Akses Site -
 567      15-Mar-24             MANDIRI IDR             1220011559559   Komplek Joglo Baru-C01                                         1,087,713         995,618     109,518               17,423          1,087,713
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Barat - Akses Site - Kavling
 568      15-Mar-24             MANDIRI IDR             1220011559559   Hankam Joglo SDA                                                 566,976         518,970         57,087             9,081           566,976
                                                                        SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Barat - Akses Site -
 569      15-Mar-24             MANDIRI IDR             1220011559559   Jl.Lingkungan-C01                                              1,320,448     1,208,648       132,951               21,151          1,320,448
                                                                        IOT PLUS TEKNOLOGI, PT , Tagihan Pelunasan
                                                                        70% atas Pengadaan Server NF5266M6 Inspur
                                                                        untuk Kebutuhan Storage CCTV 250 Titik
 570      18-Mar-24             MANDIRI IDR             1220011559559   Diskominfo Batch 3 sebanyak 4 Unit                           629,528,848   567,801,788     62,458,196          731,136           629,528,848
                                                                        GIGA DATACOM, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final
                                                                        Kab.Tanggerang - Yayasan Akademi Anak
 571      20-Mar-24             MANDIRI IDR             1220011559559   Indonesia (TK Kipina SDC) - Relokasi                           6,218,572     5,811,750       639,292           232,470             6,218,572

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 572      20-Mar-24             MANDIRI IDR             1220011559559   Selatan - Jl Terusan HR.Rasuna Said Dishub                     5,735,789     5,250,150       577,516               91,877          5,735,789
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 573      20-Mar-24             MANDIRI IDR             1220011559559   Selatan - JL. Kp.Dalam BPBD                                    4,945,158     4,526,460       497,911               79,213          4,945,158
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 574      20-Mar-24             MANDIRI IDR             1220011559559   Selatan - Stasiun Tebet Dishub                                 6,994,546     6,402,330       704,256           112,040             6,994,546
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 575      20-Mar-24             MANDIRI IDR             1220011559559   Selatan - JPO Amaris Dishub                                    3,875,170     3,547,066       390,177               62,073          3,875,170

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 576      20-Mar-24             MANDIRI IDR             1220011559559   Selatan - Terminal Lebak Bulus 2 Dishub                        4,816,057     4,408,290       484,912               77,145          4,816,057
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 577      20-Mar-24             MANDIRI IDR             1220011559559   Timur - JPO Pasar Pramuka Dishub                              11,011,024    10,078,740      1,108,661          176,377            11,011,024
Page 41
                                                                                                       Page 38
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                    NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                       NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 578      20-Mar-24             MANDIRI IDR             1220011559559   Selatan - Jl. Raya Lenteng Agung Dishub                         5,967,836    5,462,550        600,880               95,594          5,967,836

                                                                        ACCESS LINTAS SOLUSI, PT , Pembelian Router
 579      20-Mar-24             MANDIRI IDR             1220011559559   RB4011IGS+RM Mikrotik Sebanyak 1 Pcs                            3,579,750    3,225,000        354,750                  -            3,579,750

                                                                        TADYA MANDIRI SINERGI, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Udara Final
 580      21-Mar-24             MANDIRI IDR             1220011559559   Jakarta Selatan - PT Sansaine Exindo                              806,673         753,900         82,929            30,156           806,673
                                                                        SYMMETRY CONTRACTING INDONESIA, PT ,
                                                                        Tagihan 90% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Pusat - Akses Site - Istiqlal
 581      21-Mar-24             MANDIRI IDR             1220011559559   Dishub (2 Titik & 4 CCTV)                                       3,891,824    3,591,900        395,109               95,185          3,891,824
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
                                                                        Final Jakarta Selatan - Lapiazza Summarecon
 582      21-Mar-24             MANDIRI IDR             1220011559559   Mall Kelapa Gading                                              3,592,468    3,288,300        361,713               57,545          3,592,468

                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
 583      21-Mar-24             MANDIRI IDR             1220011559559   Final Jakarta Selatan - PT Medidata Indonesia                   1,027,169         940,200     103,422               16,453          1,027,169

                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Jakarta Selatan - Jl. Patal Senayan Dishub
 584      21-Mar-24             MANDIRI IDR             1220011559559   (Relokasi Jl.Metro Pondok Indah-C02)                              259,491         237,520         26,127             4,156           259,491

                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Tanam Final
 585      21-Mar-24             MANDIRI IDR             1220011559559   Jakarta Barat - Green Sedayu Mall (Redundant)                  55,073,799   50,410,800       5,545,188          882,189            55,073,799
                                                                        SINAR MODERN, CV , Tagihan 100% atas
                                                                        Pekerjaan Geser Tiang Cluster Putat Jaya RW10
                                                                        dikarenakan akan digunakan sebagai Akses
 586      21-Mar-24             MANDIRI IDR             1220011559559   Jalan Masuk Rumah                                               1,372,382    1,256,185        138,180               21,983          1,372,382
                                                                        SINAR MODERN, CV , Tagihan 100% atas
                                                                        Pekerjaan Geser Tiang Cluster Mojo RW05
                                                                        dikarenakan akan digunakan sebagai Akses
 587      21-Mar-24             MANDIRI IDR             1220011559559   Jalan Masuk Rumah                                               1,481,632    1,356,185        149,180               23,733          1,481,632
                                                                        TOKOPEDIA, PT , Biaya Pembelian Tangga
                                                                        Telescopic 12 unit untuk kebutuhan tim
 588      22-Mar-24             MANDIRI IDR             1220011559559   operation dan Project                                          16,003,100   16,003,100               -                 -           16,003,100

                                                                        ASIA TEKNOLOGI SOLUSI, PT , Biaya Instalasi
                                                                        dan Kelebihan Kabel Sewa Local Loop 10 Mbps
                                                                        PT Asia Teknologi Solusi untuk Tenant PT Fiber
 589      26-Mar-24             MANDIRI IDR             1220011559559   Network Indonesia site Hotel Mercure Sabang                     2,915,750    2,675,000        294,250               53,500          2,915,750
                                                                        ASIA TEKNOLOGI SOLUSI, PT , Biaya 2 Unit
                                                                        Mikrotik Gigabit Passive Ethernet Sewa Local
                                                                        Loop 10 Mbps PT Asia Teknologi Solusi untuk
                                                                        Tenant PT Fiber Network Indonesia site Hotel
 590      26-Mar-24             MANDIRI IDR             1220011559559   Mercure Sabang                                                  2,071,000    1,900,000        209,000               38,000          2,071,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 65 di Apartement Green
 591      26-Mar-24             MANDIRI IDR             1220011559559   Pramuka                                                         4,116,000    4,200,000               -              84,000          4,116,000
Page 42
                                                                                                   Page 39
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                            NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 63 di Apartement Green
 592      26-Mar-24             MANDIRI IDR             1220011559559   Pramuka                                                   4,116,000     4,200,000          -                84,000          4,116,000
                                                                        BIBIT , Biaya Relokasi Tiang atas permintaan
                                                                        pemilik lahan di Cluster Graha Mandiri dan
                                                                        Relokasi Tiang Cluster Padang Indah dan
                                                                        Perbaikan FO Cut Link Ocean View Uluwatu
                                                                        karena kabel landai yang tertabrak Truk sesuai
 593      27-Mar-24             MANDIRI IDR             1220011559559   TT J0127-010                                              3,573,403     3,665,029          -                91,626          3,573,403
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Pemutusan Kabel Bina
 594      27-Mar-24             MANDIRI IDR             1220011559559   Marga site Bangka-012                                     2,590,133     2,420,685     266,275               96,827          2,590,133
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Kabel FO Impact
                                                                        Pembangunan Trotoar Jalan site MP Duri Kepa-
 595      27-Mar-24             MANDIRI IDR             1220011559559   001                                                       3,361,603     3,141,685     345,585           125,667             3,361,603
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Hit By Truck site
 596      27-Mar-24             MANDIRI IDR             1220011559559   Kayuringin Jaya-015                                       1,772,653     1,656,685     182,235               66,267          1,772,653
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Kebakaran site MP
 597      27-Mar-24             MANDIRI IDR             1220011559559   Duren Sawit-002                                           1,465,563     1,369,685     150,665               54,787          1,465,563

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan FO Cut Impact Kabel
 598      27-Mar-24             MANDIRI IDR             1220011559559   Vandalisme Site MP-Utan Kayu Selatan-001                  1,853,973     1,732,685     190,595               69,307          1,853,973
                                                                        KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                        atas Pengadaan Bracket CCTV Bullet Arm
                                                                        Mounting Pole FO Round untuk Kebutuhan
                                                                        CCTV 204 Titik Diskominfo Batch 3 sebanyak 75
 599      1-Apr-24              MANDIRI IDR             1220011559559   Set                                                      73,260,000    66,000,000    7,260,000                 -           73,260,000
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 600      1-Apr-24              MANDIRI IDR             1220011559559   Jakarta Pusat - PT Hasmico Solusi Indonesia              19,071,117    17,456,400    1,920,204          305,487            19,071,117
                                                                        FURUKAWA OPTICAL SOLUTIONS INDONESIA,
                                                                        PT , Tagihan 100% atas Pengadaan Cable Optical
                                                                        SM Drop 1 Core with Messenger sebanyak
 601      1-Apr-24              MANDIRI IDR             1220011559559   180.000 Mtr                                             319,680,000   288,000,000   31,680,000                 -          319,680,000
                                                                        BINTANG MAS UTAMA, CV , Biaya Pembelian
                                                                        UTP cat-6 Belden - 7814A 1 roll 305m,Konektor
                                                                        RJ-45 cat 6 Belden - 1 pack 50 pcs,Cable Ties
                                                                        Nylon - 30 cm black , cable ties nylon - 25 cm
                                                                        putih dan Cable ties nylon - 30 cm putih untuk
 602      2-Apr-24              MANDIRI IDR             1220011559559   spare stock Warehouse Bali                               14,102,550    12,705,000    1,397,550                 -           14,102,550
                                                                        FANAH JAYA MAINDO, PT , Pembelian Kabel
                                                                        LAN UTP Cat-6 915 Mtr, Pigtail SM SC/UPC -
 603      2-Apr-24              MANDIRI IDR             1220011559559   0.9mm 1.5m 100 Pcs, dll                                  11,082,772     9,984,480    1,098,292                 -           11,082,772
                                                                        METALOGIC INFOMITRA, PT , Pembelian UPS
                                                                        Headend UPS APC Back BX2200MI-MS 2200VA
 604      2-Apr-24              MANDIRI IDR             1220011559559   Sebanyak 3 Unit                                          12,254,400    11,040,000    1,214,400                 -           12,254,400
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Ties 500 Pcs, Imundex C-Clamp 1.000 Pcs,
 605      2-Apr-24              MANDIRI IDR             1220011559559   Pigtail SC/APC 2mm 50 Unit, dll                          27,893,745    25,129,500    2,764,245                 -           27,893,745

                                                                        KALIABANG JAYA PRATAMA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Tanam 24 Core -
 606      2-Apr-24              MANDIRI IDR             1220011559559   FO Link Akses to Site_59 Batu Canggu                     95,493,133    88,133,948    9,694,734         2,335,549           95,493,133
Page 43
                                                                                                    Page 40
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP           PPN              PPh          NET DIBAYARKAN
                                                                        DIRGA BAHARI PERKASA, PT , Tagihan
                                                                        Pelunasan 70% atas Pengadaan CCTV DS-
                                                                        2CT4051G0-1 Hikvision sebanyak 500 Unit
 607      2-Apr-24              MANDIRI IDR             1220011559559   (Batch 3)                                                419,802,999   378,200,900   41,602,099              -          419,802,999
                                                                        VEKTORDAYA MEKATRIKA, PT , DP 30% atas
                                                                        Pengadaan Vektor UPS DPA Modular 12V-
 608      2-Apr-24              MANDIRI IDR             1220011559559   200AH, Charge Engineer dan Testing Setting                60,600,000    60,600,000          -                -           60,600,000
                                                                        METALOGIC INFOMITRA, PT , Pembelian VGA
                                                                        GDDR6 16GB Sebanyak 7 Unit untuk Kebutuhan
 609      2-Apr-24              MANDIRI IDR             1220011559559   CCTV 200 Titik                                            62,820,450    56,595,000    6,225,450              -           62,820,450
                                                                        FANAH JAYA MAINDO, PT , Pembelian APC
                                                                        Smart-UPS, Line Interactive 2200VA Tower
 610      2-Apr-24              MANDIRI IDR             1220011559559   230V Sebanyak 1 Unit                                      20,535,000    18,500,000    2,035,000              -           20,535,000

                                                                        FANAH JAYA MAINDO, PT , Pembelian Roll Mini
                                                                        Budget Cat Tembok Ace Oldfields 5 Pcs, Cat Seiv
 611      2-Apr-24              MANDIRI IDR             1220011559559   Chemolux Warna Super White 10 Pcs, dll                    10,647,675     9,592,500    1,055,175              -           10,647,675
                                                                        FANAH JAYA MAINDO, PT , Pembelian Media
                                                                        Converter HTB-GS-03-A Netlink Sebanyak 70
                                                                        Unit, Media Converter HTB-GS-03-B Netlink
 612      2-Apr-24              MANDIRI IDR             1220011559559   Sebanyak 70 Unit                                          12,975,900    11,690,000    1,285,900              -           12,975,900
                                                                        FANAH JAYA MAINDO, PT , Pembelian Adaptor
                                                                        Power Supply AC to DC 12V 2A Sebanyak 2.771
 613      2-Apr-24              MANDIRI IDR             1220011559559   Unit                                                      55,364,580    49,878,000    5,486,580              -           55,364,580
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Ties Nylon 10cm White Sebanyak 230.605 Pcs,
                                                                        Cable Flag Label L84MM W 26MM Sebanyak
 614      2-Apr-24              MANDIRI IDR             1220011559559   7.807 Pcs                                                  9,290,979     8,370,252     920,727               -            9,290,979
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 41
 615      2-Apr-24              MANDIRI IDR             1220011559559   untuk 60 Sales Order                                      14,952,300    13,800,000    1,518,000          365,700         14,952,300
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 42
 616      2-Apr-24              MANDIRI IDR             1220011559559   untuk 60 Sales Order                                      14,952,300    13,800,000    1,518,000          365,700         14,952,300
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 23
 617      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 26
 618      2-Apr-24              MANDIRI IDR             1220011559559   untuk 29 Sales Order                                       7,226,945     6,670,000     733,700           176,755          7,226,945
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 27
 619      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 28
 620      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 31
 621      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 32
 622      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 34
 623      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 35
 624      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                       7,476,150     6,900,000     759,000           182,850          7,476,150
Page 44
                                                                                                   Page 41
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP             PPN              PPh          NET DIBAYARKAN
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 36
 625      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                     7,476,150    6,900,000        759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 37
 626      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                     7,476,150    6,900,000        759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 38
 627      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                     7,476,150    6,900,000        759,000           182,850          7,476,150
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 40
 628      2-Apr-24              MANDIRI IDR             1220011559559   untuk 30 Sales Order                                     7,476,150    6,900,000        759,000           182,850          7,476,150
                                                                        SUNICODATA COMININDO, PT , Pembelian
                                                                        Switch S4600 10P SI DCN Sebanyak 20 Unit
 629      2-Apr-24              MANDIRI IDR             1220011559559   untuk Kebutuhan Stock Material Switch DCN               41,070,000   37,000,000       4,070,000              -           41,070,000
                                                                        MALAKA KARYA UTAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 630      2-Apr-24              MANDIRI IDR             1220011559559   Timur - Jl. Sodong Raya Kesbangpol                       8,966,011    8,379,450        921,739           335,178          8,966,011

                                                                        MALAKA KARYA UTAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 631      2-Apr-24              MANDIRI IDR             1220011559559   Timur - Jl. Jatinegara Kaum Kesbangpol                   6,286,945    5,875,650        646,321           235,026          6,286,945

                                                                        MALAKA KARYA UTAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 632      2-Apr-24              MANDIRI IDR             1220011559559   Timur - Jl. Cipinang Baru Raya Kesbangpol                4,622,304    4,319,910        475,190           172,796          4,622,304
                                                                        TELCO ABADI JAYA, PT , Pembelian Alat Ukur
                                                                        Meteran Dorong Digital 10.000M Sebanyak 10
                                                                        Unit, Visual Fault Locator Range 10KM
 633      2-Apr-24              MANDIRI IDR             1220011559559   Sebanyak 17 Unit, dll                                   11,305,350   10,185,000       1,120,350              -           11,305,350
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable UTP
 634      2-Apr-24              MANDIRI IDR             1220011559559   Cat 6 with Connector 3M Sebanyak 50 Unit                 3,996,000    3,600,000        396,000               -            3,996,000
                                                                        TELCO ABADI JAYA, PT , Pembelian Connector
                                                                        RJ45 Cat 5E Sebanyak 1.000 Unit untuk
 635      2-Apr-24              MANDIRI IDR             1220011559559   Kebutuhan Q4                                             1,887,000    1,700,000        187,000               -            1,887,000
                                                                        TELCO ABADI JAYA, PT , Pembelian Patchcord
                                                                        SM Simplex FC/UPC-LC/APC 2MM 5M Sebanyak
 636      2-Apr-24              MANDIRI IDR             1220011559559   10 Unit                                                    238,650         215,000         23,650            -             238,650
                                                                        TELCO ABADI JAYA, PT , Pembelian Cable Power
                                                                        NYA 1.5MM Blue Sebanyak 10.000 cm, Cable
                                                                        Power NYA 1.5MM Black Sebanyak 10.000 cm,
 637      2-Apr-24              MANDIRI IDR             1220011559559   dll                                                      1,136,640    1,024,000        112,640               -            1,136,640
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Cable Optical Drop SM 4Core With Mesenger
 638      2-Apr-24              MANDIRI IDR             1220011559559   sebanyak 10.000 MTR                                     21,090,000   19,000,000       2,090,000              -           21,090,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        OTB Indoor 24 Core SC/UPC Sebanyak 30 Unit
 639      2-Apr-24              MANDIRI IDR             1220011559559   untuk Kebutuha Stock Q4                                 18,315,000   16,500,000       1,815,000              -           18,315,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 4 Core SC/UPC With Adaptor and
 640      2-Apr-24              MANDIRI IDR             1220011559559   Pigtail Full Set Sebanyak 50 Pcs                         4,995,000    4,500,000        495,000               -            4,995,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Connector Fast SC/APC Sebanyak 10.000 Pcs
 641      2-Apr-24              MANDIRI IDR             1220011559559   untuk Kebutuhan IKR                                     83,250,000   75,000,000       8,250,000              -           83,250,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 8 Core SC/UPC With Adaptor With
                                                                        Pigtail Sebanyak 20 Pcs untuk Kebutuhan Stock
 642      2-Apr-24              MANDIRI IDR             1220011559559   Jan 2024                                                 1,998,000    1,800,000        198,000               -            1,998,000
Page 45
                                                                                                     Page 42
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        MONETI INDO TEKNO, PT , Pembelian ODB
                                                                        Outdoor 24 Core SC/UPC Sebanyak 70 Unit
 643      2-Apr-24              MANDIRI IDR             1220011559559   untuk Kebutuhan Stock Q4                                    31,468,500   28,350,000    3,118,500                 -           31,468,500
                                                                        MONETI INDO TEKNO, PT , Pembelian ODB
                                                                        Outdoor 24 Core SC/UPC Sebanyak 200 Unit
                                                                        untuk Kebutuhan CCTV 250 titik Diskominfo
 644      2-Apr-24              MANDIRI IDR             1220011559559   Batch 3                                                     89,910,000   81,000,000    8,910,000                 -           89,910,000

                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , Tagihan Pelunasan 100% atas Pengadaan
                                                                        Nokia Wifi Beacon Dual Band AC1200 2XGE EU
 645      2-Apr-24              MANDIRI IDR             1220011559559   Plug HA-020W-B sebanyak 200 Unit                           105,201,360   94,776,000   10,425,360                 -          105,201,360

                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
 646      2-Apr-24              MANDIRI IDR             1220011559559   FO Cut Diskominfo AP RW17, Penjaringan Jak-ut                1,344,475    1,378,948          -                34,473          1,344,475
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Diskominfo AP RW04, Kapuk,
 647      2-Apr-24              MANDIRI IDR             1220011559559   Cengkareng, Jak-Bar                                          1,335,115    1,369,348          -                34,233          1,335,115
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Penarikan Kabel FO Cut Impact tertabrak Truck
                                                                        site Diskominfo AP RW04, Kapuk, Cengkareng,
 648      2-Apr-24              MANDIRI IDR             1220011559559   Jak-Bar                                                      1,920,115    1,969,348          -                49,233          1,920,115
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Penarikan Kabel FO Cut Impact tertabrak Truck
                                                                        site Diskominfo AP RW08, Kedoya Utara,
 649      2-Apr-24              MANDIRI IDR             1220011559559   Cengkareng, Jak-Bar                                          2,051,155    2,103,748          -                52,593          2,051,155
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Penarikan Kabel FO Cut Impact tertabrak Truck
                                                                        site Diskominfo AP RW04, Kapuk, Cengkareng,
 650      2-Apr-24              MANDIRI IDR             1220011559559   Jak-Bar                                                      1,617,475    1,658,948          -                41,473          1,617,475
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Relokasi Kabel Cluster Buana Graha site
 651      2-Apr-24              MANDIRI IDR             1220011559559   Kayuringin Jaya-015                                          1,218,115    1,249,348          -                31,233          1,218,115
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemasangan Tiang FAT 01-002 Cluster Petojo
 652      2-Apr-24              MANDIRI IDR             1220011559559   RW07 site MP Cideng-002                                      1,267,255    1,299,748          -                32,493          1,267,255
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring di Cluster Sunter Agung
 653      2-Apr-24              MANDIRI IDR             1220011559559   08 site Sunter Agung-012                                     1,531,675    1,570,948          -                39,273          1,531,675
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perapihan Kabel di Cluster Limo RW03 Cinere-
 654      2-Apr-24              MANDIRI IDR             1220011559559   014 site MP Depok-03                                         1,753,195    1,798,148          -                44,953          1,753,195
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring di Cluster Jl. Lebak Bulus
 655      2-Apr-24              MANDIRI IDR             1220011559559   site MP Lebak Bulus-001                                      1,281,295    1,314,148          -                32,853          1,281,295
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perpindahan FAT Cluster Jl. Dermaga site MP
 656      2-Apr-24              MANDIRI IDR             1220011559559   Duren Sawit-001                                              1,151,815    1,181,348          -                29,533          1,151,815
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang di Cluster Jl. Penggilingan site
 657      2-Apr-24              MANDIRI IDR             1220011559559   MP Penggilingan-001                                          1,113,595    1,142,148          -                28,553          1,113,595
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perapihan Kabel Landai di Jl. Raya Bogor site
 658      2-Apr-24              MANDIRI IDR             1220011559559   MP Cibubur-001                                               1,188,475    1,218,948          -                30,473          1,188,475
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Relokasi Kabel KU KT Impact Program PU
                                                                        Pembangunan Rusun Nuansa Cilangkap site MP
 659      2-Apr-24              MANDIRI IDR             1220011559559   Cilangkap-001                                                3,506,635    3,596,548          -                89,913          3,506,635
Page 46
                                                                                                   Page 43
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan TT PM Perapihan Kabel
                                                                        dan Tiang Cluster Jembatan Besi RW02 site MP
 660      2-Apr-24              MANDIRI IDR             1220011559559   Pejagalan-001                                             1,255,555    1,287,748             -                32,193          1,255,555
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perpindahan Tiang di JL. Cileungsi
 661      2-Apr-24              MANDIRI IDR             1220011559559   Jalur MSC site MP Cilangkap-001                           1,146,355    1,175,748             -                29,393          1,146,355
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Kabel Landai dan Tiang
 662      2-Apr-24              MANDIRI IDR             1220011559559   Miring site Pela Mampang-002                              2,282,035    2,340,548             -                58,513          2,282,035
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Cluster Ciganjur
 663      2-Apr-24              MANDIRI IDR             1220011559559   RW03 site Cipinang Cempedak-001                           1,860,835    1,908,548             -                47,713          1,860,835
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Tertabrak Truck PT
 664      2-Apr-24              MANDIRI IDR             1220011559559   BGR Logistik Indonesia                                    1,250,095    1,282,148             -                32,053          1,250,095
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Kabel Landai Komplek DPR
 665      2-Apr-24              MANDIRI IDR             1220011559559   Ciganjur site MP Jagakarsa-001                            1,874,095    1,922,148             -                48,053          1,874,095
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Tiang Appartement East
 666      2-Apr-24              MANDIRI IDR             1220011559559   Park site MP Penggilingan-001                             1,593,295    1,634,148             -                40,853          1,593,295
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang dan kabel Cluster
                                                                        Perumahan Kemang Selatan RW03 site MP
 667      2-Apr-24              MANDIRI IDR             1220011559559   Bangka-001                                                1,527,775    1,566,948             -                39,173          1,527,775
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel Cluster Pondok
 668      2-Apr-24              MANDIRI IDR             1220011559559   Ranggon RW03 site Pondok Ranggon-004                        867,895         890,148          -                22,253           867,895
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel dan Tiang Cluster
                                                                        Apt. Taman Semanan Indah site Duri Kosambi-
 669      2-Apr-24              MANDIRI IDR             1220011559559   018                                                       1,005,175    1,030,948             -                25,773          1,005,175
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Miring dan Kabel
 670      2-Apr-24              MANDIRI IDR             1220011559559   Landai site MP Duren Sawit-001                            1,986,415    2,037,348             -                50,933          1,986,415
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan FAT Cluster Duri RW04
 671      2-Apr-24              MANDIRI IDR             1220011559559   site MP Manggarai Selatan-001                             1,613,185    1,654,548             -                41,363          1,613,185

                                                                        BERKAH SYARIAH BERSAMA, PT , Pembelian
                                                                        Rompi Safety Kombinasi Orange Gosave
                                                                        Sebanyak 50 Pcs, LAN Tester Wire Tracker Cable
 672      3-Apr-24              MANDIRI IDR             1220011559559   Scan Track Line Finder Sebanyak 10 Unit, dll             16,039,500   14,450,000       1,589,500                 -           16,039,500
                                                                        ARALIA ARTHA MANDIRI, CV , Pembelian
                                                                        Motherboard Rog Strix Z790-A Sebanyak 3 Unit
 673      3-Apr-24              MANDIRI IDR             1220011559559   untuk Kebutuhan CCTV 200 Titik                           21,750,001   19,594,596       2,155,405                 -           21,750,001
                                                                        KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                        atas Pengadaan Bracket CCTV Bullet Arm
                                                                        Mounting Pole FO Round untuk Kebutuhan
                                                                        CCTV 250 Titik Diskominfo Batch 3 sebanyak 75
 674      3-Apr-24              MANDIRI IDR             1220011559559   Set                                                      66,600,000   60,000,000       6,600,000                 -           66,600,000
                                                                        KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                        atas Pengadaan Bracket CCTV Bullet Arm
                                                                        Mounting Pole FO Round untuk Kebutuhan
                                                                        CCTV 204 Titik Diskominfo Batch 3 sebanyak 6
 675      3-Apr-24              MANDIRI IDR             1220011559559   Set                                                       5,860,800    5,280,000        580,800                  -            5,860,800
Page 47
                                                                                                     Page 44
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                               NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel Tanam
 676      3-Apr-24              MANDIRI IDR             1220011559559   Final Jakarta Selatam - JPO Amaris Dishub                    510,852         467,598         51,436             8,182           510,852
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Dismantle dan Relokasi 5
                                                                        Access Point Jakarta Utara - Akses Site - Hutan
 677      3-Apr-24              MANDIRI IDR             1220011559559   Kota Penjaringan                                             649,328         594,350         65,379            10,401           649,328
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Tanam Final
 678      3-Apr-24              MANDIRI IDR             1220011559559   Jakart Utara - Kantor Balitower Pluit                     16,468,455   15,074,100       1,658,151          263,796            16,468,455
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 679      3-Apr-24              MANDIRI IDR             1220011559559   Jakarta Selatan - Simpang Jl Pakubuwono                    1,945,542    1,780,816        195,890               31,164          1,945,542
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 680      3-Apr-24              MANDIRI IDR             1220011559559   Jakarta Selatan - JPO Jl.Prof DR Soepomo                   8,912,866    8,158,230        897,405           142,769             8,912,866
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 681      3-Apr-24              MANDIRI IDR             1220011559559   Jakarta Selatan - Jl. Jend Sudirman C01                    1,890,971    1,730,866        190,395               30,290          1,890,971

                                                                        TADYA MANDIRI SINERGI, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel FO Final as
 682      3-Apr-24              MANDIRI IDR             1220011559559   Build Jakarta Utara - Akses Site - Pluit-062               1,932,821    1,806,374        198,701               72,254          1,932,821
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Kabel Terlindas Alat Berat Proyek
 683      3-Apr-24              MANDIRI IDR             1220011559559   Menara Citicon                                             1,240,540    1,272,348               -              31,808          1,240,540
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring Cluster Dermaga site
 684      3-Apr-24              MANDIRI IDR             1220011559559   Duren Sawit-001                                            2,396,305    2,457,748               -              61,443          2,396,305
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Hit by Truck site MP Pejagalan-
 685      3-Apr-24              MANDIRI IDR             1220011559559   001                                                        1,701,715    1,745,348               -              43,633          1,701,715
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring dan kabel Landai site
 686      3-Apr-24              MANDIRI IDR             1220011559559   MP Cipinang-001                                            1,589,785    1,630,548               -              40,763          1,589,785
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring Cluster Jl. Buncit Raya
 687      3-Apr-24              MANDIRI IDR             1220011559559   site MP Bangka-001                                         2,167,375    2,222,948               -              55,573          2,167,375
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Cluster Villa Kelapa Dua site
 688      3-Apr-24              MANDIRI IDR             1220011559559   MP Ulujami-001                                             2,404,495    2,466,148               -              61,653          2,404,495
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Kabel Cluster Rusun Apron site MP
 689      3-Apr-24              MANDIRI IDR             1220011559559   Sunter Jaya-001                                            1,505,155    1,543,748               -              38,593          1,505,155
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Penarikan Kabel Distribusi Cluster Rawa Barat
 690      3-Apr-24              MANDIRI IDR             1220011559559   site MP Rawa Barat-001                                     1,807,795    1,854,148               -              46,353          1,807,795
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Kabel Landai Cluster Limo RW16 site
 691      3-Apr-24              MANDIRI IDR             1220011559559   Cinere-014                                                 1,385,035    1,420,548               -              35,513          1,385,035
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
 692      3-Apr-24              MANDIRI IDR             1220011559559   FO Cut Impact Hit by Truck site Cinere-014                 1,618,255    1,659,748               -              41,493          1,618,255
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Pemutusan Dinas Terkait site MP
 693      3-Apr-24              MANDIRI IDR             1220011559559   Kayu Putih-001                                             1,909,195    1,958,148               -              48,953          1,909,195
Page 48
                                                                                                    Page 45
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Penarikan Kabel Jalur Distribusi Cluster site MP
 694      3-Apr-24              MANDIRI IDR             1220011559559   Cilangkap-001                                               1,099,555    1,127,748               -              28,193          1,099,555
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Dismantle dan Perapihan Kabel PT Sigap site
 695      3-Apr-24              MANDIRI IDR             1220011559559   Sungai Bambu-020                                            1,884,235    1,932,548               -              48,313          1,884,235
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemindahan Tiang FAT-01-017 Kapuk RW15 site
 696      3-Apr-24              MANDIRI IDR             1220011559559   Kapuk-009                                                   1,876,045    1,924,148               -              48,103          1,876,045
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Relokasi Tiang Cluster Grogol RW09 Impact
 697      3-Apr-24              MANDIRI IDR             1220011559559   Pembangunan Rumah site Mampang-008                          1,277,005    1,309,748               -              32,743          1,277,005
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 4 Core SC/UPC With Adaptor and
 698      4-Apr-24              MANDIRI IDR             1220011559559   Pigtail Full Set Sebanyak 5 Unit                              388,500         350,000         38,500               -             388,500

                                                                        BERCA HARDAYAPERKASA, PT , Pembelian
 699      16-Apr-24             MANDIRI IDR             1220011559559   Kabel Power NYM 3x2.5mm Sebanyak 200 Mtr                    4,107,000    3,700,000        407,000                  -            4,107,000
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 66 di Apartement Green
 700      16-Apr-24             MANDIRI IDR             1220011559559   Pramuka                                                     4,116,000    4,200,000               -              84,000          4,116,000
                                                                        DJAJA LISTRIK, PT , Pembelian Battre Fushion
                                                                        Splicer Inno View 3 Sebanyak 2 Unit, Fiber Optic
                                                                        Tools OTDR JFO-212 Sebanyak 2 Unit, Lampu
                                                                        LED Darurat Portable Warna Putih Sebanyak 3
 701      16-Apr-24             MANDIRI IDR             1220011559559   Unit                                                       22,449,750   20,225,000       2,224,750                 -           22,449,750
                                                                        PLN PERSERO, PT , Biaya Penyambungan Daya
                                                                        PLN Site Kelapa Gading Barat-011 - CCTV CSR
 702      16-Apr-24             MANDIRI IDR             1220011559559   Jakwifi                                                     1,421,500    1,421,500               -                 -            1,421,500
                                                                        MDT TOTAL SOLUTION, PT , Biaya Pengadaan
                                                                        SFP untuk Material Spare Stock Bali WH (PO
 703      17-Apr-24             MANDIRI IDR             1220011559559   Rp.12.987.000,- PPN Rp.1.287.000,-)                        12,987,000   11,700,000       1,287,000                 -           12,987,000
                                                                        MDT TOTAL SOLUTION, PT , Pembelian SFP Bidi
                                                                        1.25 GB 1310NM/1550NM DDM LC 10KM
                                                                        Sebanyak 200 Pcs, SFP Bidi 1.25GB
                                                                        1550NM/1310NM DDM LC 10KM Sebanyak 200
 704      17-Apr-24             MANDIRI IDR             1220011559559   Pcs                                                        86,580,000   78,000,000       8,580,000                 -           86,580,000
                                                                        MDT TOTAL SOLUTION, PT , Pembelian
                                                                        Patchcord SM Duplex LC/UPC-LC/UPCM 3MM
 705      17-Apr-24             MANDIRI IDR             1220011559559   25M Sebanyak 5 Pcs                                            471,750         425,000         46,750               -             471,750
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Duct L 1.700MM W 25MM H 25MM White
                                                                        Sebanyak 50 Pcs, Cable Duct L 1000MM W
 706      18-Apr-24             MANDIRI IDR             1220011559559   13MM H 8MM White Sebanyak 150 Pcs                           4,551,000    4,100,000        451,000                  -            4,551,000
                                                                        BERCA HARDAYAPERKASA, PT , Pembelian RJ45
                                                                        Cat 5E Sebanyak 1500 Unit, Konektor RJ-45 Cat6
                                                                        Belden 500 Unit, Kabel LAN Belden UTP Cat6
 707      18-Apr-24             MANDIRI IDR             1220011559559   7814A Sebanyak 7320 Mtr                                    60,233,040   54,264,000       5,969,040                 -           60,233,040
                                                                        FANAH JAYA MAINDO, PT , Pembelian Cable
                                                                        Power NYYHY 3X2.5MM Kebutuhan CCTV 250
 708      18-Apr-24             MANDIRI IDR             1220011559559   Titik Diskominfo Batch 3 Sebanyak 500 MTR                   9,990,000    9,000,000        990,000                  -            9,990,000
                                                                        FANAH JAYA MAINDO, PT , Pembelian Adaptor
                                                                        Power Supply AC to DC 12V 2A Sebanyak 3.986
 709      18-Apr-24             MANDIRI IDR             1220011559559   Unit                                                       79,640,280   71,748,000       7,892,280                 -           79,640,280
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Relokasi Jaringan
                                                                        Utilitas Rusun Nuansa Jl. Raya Cilangkap site MP
 710      18-Apr-24             MANDIRI IDR             1220011559559   Cilangkap-001                                              50,520,478   46,243,000       5,086,730          809,252            50,520,478
Page 49
                                                                                                    Page 46
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                           NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Relokasi Jaringan
 711      18-Apr-24             MANDIRI IDR             1220011559559   Utilitas Jl. Taman S Parman                               7,588,505    6,946,000     764,060           121,555             7,588,505
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
 712      18-Apr-24             MANDIRI IDR             1220011559559   Pemindahan Tiang Site Bukit Duri-003                      1,234,495    1,266,148         -                 31,653          1,234,495
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Feeder Permata Eksekutif dan Villa
                                                                        Kelapa Dua Impact Pembangunan SDA site MP
 713      18-Apr-24             MANDIRI IDR             1220011559559   Ulujami-001                                               5,853,538    6,003,628         -             150,090             5,853,538
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemindahan Tiang Cluster Pegangsaan Dua
 714      18-Apr-24             MANDIRI IDR             1220011559559   RW07 site MP Pegangsaan Dua-001                           2,078,065    2,131,348         -                 53,283          2,078,065
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Reroute Feeder Pulo Raya RW01 site MP Rawa
 715      18-Apr-24             MANDIRI IDR             1220011559559   Barat-001                                                 1,894,375    1,942,948         -                 48,573          1,894,375
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perapihan Subduct site Summarecon Mall
 716      18-Apr-24             MANDIRI IDR             1220011559559   Serpong                                                   2,884,975    2,958,948         -                 73,973          2,884,975
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pasang Tiang Baru Impact Tiang FAT Hilang di
 717      18-Apr-24             MANDIRI IDR             1220011559559   Cluster Setu RW03 site Cilangkap-013                      1,418,575    1,454,948         -                 36,373          1,418,575
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Penarikan Kabel FO Cut Impact Tertabrak Truck
                                                                        site Diskominfo AP RW02 Marunda, Cilincing,
 718      18-Apr-24             MANDIRI IDR             1220011559559   Jak-Ut                                                    2,269,555    2,327,748         -                 58,193          2,269,555
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemindahan FAT 01-016 Kukusan RW07 & 08
                                                                        Impact Pembangunan Gerbang Cluster
 719      18-Apr-24             MANDIRI IDR             1220011559559   Perumahan site DPOK 01                                    1,850,305    1,897,748         -                 47,443          1,850,305
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Kabel Landai site MP Kampung
 720      18-Apr-24             MANDIRI IDR             1220011559559   Melayu-001                                                1,726,675    1,770,948         -                 44,273          1,726,675
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Relokasi FAT Pedestel 05-186 PBU RW09 Impact
                                                                        Pembangunan Rumah site Kembangan Selatan-
 721      18-Apr-24             MANDIRI IDR             1220011559559   015                                                       1,052,365    1,079,348         -                 26,983          1,052,365
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Relokasi Tiang Cipayung RW08 site Cipayung-
 722      18-Apr-24             MANDIRI IDR             1220011559559   018                                                       1,277,005    1,309,748         -                 32,743          1,277,005

                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
 723      18-Apr-24             MANDIRI IDR             1220011559559   FO Cut Impact Hit by Truck site Mampang-008               1,266,475    1,298,948         -                 32,473          1,266,475

                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
 724      18-Apr-24             MANDIRI IDR             1220011559559   FO Cut Impact Hit by Truck site MP Cibubur-001            1,406,875    1,442,948         -                 36,073          1,406,875
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Migrasi Kabel Udara ke Kabel Bawah Tanah Link
 725      18-Apr-24             MANDIRI IDR             1220011559559   MTA site MP Cideng-002                                    1,165,075    1,194,948         -                 29,873          1,165,075
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Restorasi Kabel FAT 05-FAT 4 Cluster Puri
 726      18-Apr-24             MANDIRI IDR             1220011559559   Kencana site Kembangan Selatan-011                        5,010,475    5,138,948         -             128,473             5,010,475
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Penambahan Tiang 9 M Cluster Villa Mahkota
 727      18-Apr-24             MANDIRI IDR             1220011559559   site Jatiasih-001                                         1,589,395    1,630,148         -                 40,753          1,589,395
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring Cluster Duren Sawit
 728      18-Apr-24             MANDIRI IDR             1220011559559   RW17 site MP Duren Sawit-002                              1,209,925    1,240,948         -                 31,023          1,209,925
Page 50
                                                                                                      Page 47
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                      NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN

                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
 729      18-Apr-24             MANDIRI IDR             1220011559559   FO Cut Impact Hit by Truck site MP Cipedak-001                 1,275,835    1,308,548         -                 32,713          1,275,835
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Hit by Truck Cluster site Pinang-
 730      18-Apr-24             MANDIRI IDR             1220011559559   002                                                            1,633,855    1,675,748         -                 41,893          1,633,855
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pergantian Tiang Bengkok di Cluster Taman
 731      18-Apr-24             MANDIRI IDR             1220011559559   Titian Indah site MP Marga Mulya-001                           2,104,195    2,158,148         -                 53,953          2,104,195
                                                                        BIBIT , Biaya Pekerjaan Dismantle tiang sisipan
                                                                        P07_051 di Cluster Taman Sekar & Padang
                                                                        Griya,Perbaikan FO Cut Distribusi Cluster
                                                                        Pondok Kampial Permai dan di Cluster Balangan
                                                                        Pratama (PO Rp.4.648.062,- Potongan PPh
 732      19-Apr-24             SINARMAS IDR             0002999994     21(2.5%) Rp.116.202,- )                                        4,531,860    4,648,062         -             116,202             4,531,860
                                                                        INDONESIA NET TEKNOLOGI, PT , Biaya Instalasi
                                                                        Sewa Local Loop 20Mbps untuk Tenant PT
                                                                        Kitchenette Lestari (The People's Cafe) di
 733      19-Apr-24             MANDIRI IDR             1220011559559   Summarecon Villagio Karawang                                   3,270,000    3,000,000     330,000               60,000          3,270,000
                                                                        INDONESIA NET TEKNOLOGI, PT , Biaya Instalasi
                                                                        Sewa Local Loop 5Mbps untuk Tenant PT MAP
                                                                        Aktiv Adi Perkasa (Kids Station) di Summarecon
 734      19-Apr-24             MANDIRI IDR             1220011559559   Villagio Karawang                                              3,270,000    3,000,000     330,000               60,000          3,270,000
                                                                        INDONESIA NET TEKNOLOGI, PT , Biaya Instalasi
                                                                        Sewa Local Loop 5Mbps untuk Tenant PT MAP
                                                                        Aktiv Adi Perkasa (Sketchers) di Summarecon
 735      19-Apr-24             MANDIRI IDR             1220011559559   Villagio Karawang                                              3,270,000    3,000,000     330,000               60,000          3,270,000
                                                                        MITRA SECURITY ASIA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Barat - Akses Site - Simpang Jl.
 736      23-Apr-24             MANDIRI IDR             1220011559559   Joglo Raya-C01                                                 6,504,691    5,953,950     654,935           104,194             6,504,691
                                                                        MITRA SECURITY ASIA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Barat - Akses Site - Simpang Jl.
 737      23-Apr-24             MANDIRI IDR             1220011559559   Joglo Raya-C02                                                 6,685,216    6,119,190     673,111           107,085             6,685,216
                                                                        EKSAKTA SINERGI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Jl. Kartini Raya-
 738      23-Apr-24             MANDIRI IDR             1220011559559   C01                                                            1,651,597    1,524,316     167,675               40,394          1,651,597
                                                                        EKSAKTA SINERGI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Jl. Kramat IV-
 739      23-Apr-24             MANDIRI IDR             1220011559559   C01                                                            1,675,976    1,546,816     170,150               40,990          1,675,976
                                                                        EKSAKTA SINERGI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Simpang Jl.Jend
 740      23-Apr-24             MANDIRI IDR             1220011559559   Ahmad Yani-C02                                                 1,814,447    1,674,616     184,208               44,377          1,814,447
                                                                        EKSAKTA SINERGI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Jl. KH.Moh
 741      23-Apr-24             MANDIRI IDR             1220011559559   Mansyur-C03                                                    1,854,428    1,711,516     188,267               45,355          1,854,428
                                                                        EKSAKTA SINERGI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Jl.Proklamasi-
 742      23-Apr-24             MANDIRI IDR             1220011559559   C02                                                            1,651,597    1,524,316     167,675               40,394          1,651,597
Page 51
                                                                                                     Page 48
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP           PPN              PPh             NET DIBAYARKAN
                                                                        EKSAKTA SINERGI INDONESIA, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Kota Jakarta Pusat - Akses Site - Jl.Pangeran
 743      23-Apr-24             MANDIRI IDR             1220011559559   Jayakarta-C06                                               1,773,491     1,636,816     180,050               43,375          1,773,491
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
                                                                        Pusat - PT Culina Kreatif Sejahtera (We The Fest
 744      23-Apr-24             MANDIRI IDR             1220011559559   2023)                                                      26,939,925    25,177,500    2,769,525         1,007,100           26,939,925
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Kota
                                                                        Tangerang - Event PKS Summarecon Mall
 745      23-Apr-24             MANDIRI IDR             1220011559559   Serpong                                                     9,685,373     9,051,750     995,693           362,070             9,685,373
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Tanam Final Jakarta
                                                                        Pusat - Upacara 17 Agustus 2023 & Kirab
 746      23-Apr-24             MANDIRI IDR             1220011559559   Budaya                                                      5,498,730     5,139,000     565,290           205,560             5,498,730
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 747      23-Apr-24             MANDIRI IDR             1220011559559   Pusat - PT Andaru Steel One                                 4,887,225     4,567,500     502,425           182,700             4,887,225
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 748      23-Apr-24             MANDIRI IDR             1220011559559   Pusat - PT Putramaya Abadi                                  6,584,994     6,154,200     676,962           246,168             6,584,994
                                                                        TOKOPEDIA, PT , Biaya Pembelian Material ONT
                                                                        HG8145V5 HUAWEI 100 unit - Kebutuhan ONT
 749      23-Apr-24             MANDIRI IDR             1220011559559   Huawei IKR Batch 1                                         44,122,000    44,122,000          -                   -           44,122,000
                                                                        TOKOPEDIA, PT , Biaya Pembelian Material TP
                                                                        Link Untuk Keperluan POC Material Dept.
 750      23-Apr-24             MANDIRI IDR             1220011559559   APCSD Ops                                                   2,067,000     2,067,000          -                   -            2,067,000
                                                                        TOKOPEDIA, PT , Biaya Pembelian Material
                                                                        Mikrotik - Router Indoor - RB450Gx4 Untuk
 751      23-Apr-24             MANDIRI IDR             1220011559559   Keperluan Tim IP Core                                       1,727,400     1,727,400          -                   -            1,727,400
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perapihan Kabel Landai Cluster
                                                                        Tubagus Angke RW04 site MP Wijaya Kesuma-
 752      23-Apr-24             MANDIRI IDR             1220011559559   001                                                         1,728,783     1,615,685     177,725               64,627          1,728,783
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Kabel Depan Hotel Smart
                                                                        Impact Customer Plaza UOB site Kebon Melati-
 753      23-Apr-24             MANDIRI IDR             1220011559559   001                                                         1,798,333     1,680,685     184,875               67,227          1,798,333
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Impact Hit by Truck site MP
 754      23-Apr-24             MANDIRI IDR             1220011559559   Pejagalan-001                                               2,095,793     1,958,685     215,455               78,347          2,095,793

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Posisi Tiang dan Box FAT
 755      23-Apr-24             MANDIRI IDR             1220011559559   02-019 Cluster Kalisari RW01 site Pekayon-010               4,874,048     4,555,185     501,070           182,207             4,874,048
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 67 di Apartement Green
 756      24-Apr-24             MANDIRI IDR             1220011559559   Pramuka                                                     4,116,000     4,200,000          -                84,000          4,116,000
                                                                        ABLOOMY TECHNOLOGIES, INC , Pembelian
                                                                        Abloomy Access Point License Fee for WPX8324
 757      25-Apr-24             SINARMAS USD             0000670707     sebanyak 5.000 Unit                                       363,982,500   404,425,000          -          40,442,500          363,982,500
                                                                        ABLOOMY TECHNOLOGIES, INC , Pembelian
                                                                        Abloomy Access Point License Fee for WPX8324
 758      25-Apr-24             SINARMAS USD             0000670707     sebanyak 7.000 Unit                                       509,575,500   566,195,000          -          56,619,500          509,575,500
Page 52
                                                                                                    Page 49
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP           PPN              PPh          NET DIBAYARKAN
                                                                        BINTANG MAS UTAMA, CV , Biaya Pengadaan
                                                                        Tools dan Material (Grandway OPM FHP
                                                                        2P01,WD Contact Cleaner 328 ml,AMP
                                                                        Connector RJ45 Cat 5E,Cable Ties, Fiber Cable
                                                                        Protection, Alumunium Extension (PO
 759      26-Apr-24             SINARMAS IDR             0002999994     Rp.5.982.900,- PPN Rp.592.900,- )                          5,982,900     5,390,000     592,900               -            5,982,900
                                                                        ASIA TELCO NETWORKS, PT , Pembelian Panel
                                                                        Box KWH & CCTV L 400MM W 250MM H
 760      30-Apr-24             MANDIRI IDR             1220011559559   500MM Sebanyak 300 Unit                                  432,900,000   390,000,000   42,900,000              -          432,900,000
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT GPON 1GE
                                                                        SC/APC untuk Kebutuhan IKR Batch 1 sebanyak
 761      1-May-24              MANDIRI IDR             1220011559559   5.000 Pcs                                                185,924,500   185,924,500          -                -          185,924,500
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT GPON 1GE
                                                                        SC/APC untuk Kebutuhan IKR Batch 1 sebanyak
 762      1-May-24              MANDIRI IDR             1220011559559   5.000 Pcs - PPN                                           20,451,695           -     20,451,695              -           20,451,695
                                                                        BERKAH SYARIAH BERSAMA, PT , Pembelian
                                                                        Fusion Splicer (Alat Sambung Kabel FO)
 763      2-May-24              MANDIRI IDR             1220011559559   Sebanyak 5 Unit                                           98,235,000    88,500,000    9,735,000              -           98,235,000
                                                                        BERKAH SYARIAH BERSAMA, PT , Pembelian
                                                                        Tangga Telescopic - Single 4.4M Sebanyak 1
                                                                        Unit, Tanggal Telescopic - Single 6.2M Sebanyak
 764      2-May-24              MANDIRI IDR             1220011559559   2 Unit                                                     5,855,250     5,275,000     580,250               -            5,855,250
                                                                        SINAR SURYA KOMINDO, PT , Pembelian Fiber
                                                                        Optic Tools Fusion Splicer INNO-VIEW 3
 765      2-May-24              MANDIRI IDR             1220011559559   Sebanyak 2 Unit                                           72,150,000    65,000,000    7,150,000              -           72,150,000
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 43
 766      2-May-24              MANDIRI IDR             1220011559559   untuk 59 Sales Order                                      14,703,095    13,570,000    1,492,700          359,605         14,703,095
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 44
 767      2-May-24              MANDIRI IDR             1220011559559   untuk 60 Sales Order                                      14,952,300    13,800,000    1,518,000          365,700         14,952,300
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 45
 768      2-May-24              MANDIRI IDR             1220011559559   untuk 57 Sales Order                                      14,204,685    13,110,000    1,442,100          347,415         14,204,685
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 46
 769      2-May-24              MANDIRI IDR             1220011559559   untuk 60 Sales Order                                      14,952,300    13,800,000    1,518,000          365,700         14,952,300
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 50
 770      2-May-24              MANDIRI IDR             1220011559559   untuk 57 Sales Order                                      14,204,685    13,110,000    1,442,100          347,415         14,204,685
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 54
 771      2-May-24              MANDIRI IDR             1220011559559   untuk 58 Sales Order                                      14,453,890    13,340,000    1,467,400          353,510         14,453,890
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 47
 772      2-May-24              MANDIRI IDR             1220011559559   untuk 59 Sales Order                                      14,703,095    13,570,000    1,492,700          359,605         14,703,095
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 48
 773      2-May-24              MANDIRI IDR             1220011559559   untuk 59 Sales Order                                      14,703,095    13,570,000    1,492,700          359,605         14,703,095
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 49
 774      2-May-24              MANDIRI IDR             1220011559559   untuk 60 Sales Order                                      14,952,300    13,800,000    1,518,000          365,700         14,952,300
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 51
 775      2-May-24              MANDIRI IDR             1220011559559   untuk 60 Sales Order                                      14,952,300    13,800,000    1,518,000          365,700         14,952,300
Page 53
                                                                                                     Page 50
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                 NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        CIPTA KARYA TECHNOLOGY, PT , Tagihan 100%
                                                                        atas Pekerjaan Instalasi Kabel Rumah Batch 60
 776      2-May-24              MANDIRI IDR             1220011559559   untuk 60 Sales Order                                        14,952,300   13,800,000       1,518,000          365,700            14,952,300
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        MINI FDT Sebanyak 20 Unit untuk Kebutuhan
 777      2-May-24              MANDIRI IDR             1220011559559   Q1                                                          97,680,000   88,000,000       9,680,000                 -           97,680,000
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord SM Duplex LC-UPC/SC-UPC 5 Mtr
 778      2-May-24              MANDIRI IDR             1220011559559   Sebanyak 20 Pcs                                                621,600         560,000         61,600               -             621,600
                                                                        SIDO AGUNG MANDIRI, PT , Pembelian
                                                                        Patchcord SM Duplex LC-UPC/SC-UPC 3 Mtr
 779      2-May-24              MANDIRI IDR             1220011559559   Sebanyak 600 Pcs                                             9,324,000    8,400,000        924,000                  -            9,324,000
                                                                        TRI BRATA ABADI, PT , Tagihan 100% atas
                                                                        Pekerjaan Instalasi Pole 6M-Rooftop Site
 780      2-May-24              MANDIRI IDR             1220011559559   Pejagalan-033                                               72,008,703   66,459,348       7,310,528         1,761,173           72,008,703
                                                                        TRI BRATA ABADI, PT , Tagihan 100% atas
                                                                        Relokasi Pekerjaan Civil Works Tiang Baja
 781      2-May-24              MANDIRI IDR             1220011559559   Octagonal Steel 21 M Site Duri Kosambi-027                  26,628,138   24,886,110       2,737,472          995,444            26,628,138
                                                                        TRI BRATA ABADI, PT , Tagihan 100% atas
                                                                        Relokasi Pekerjaan Civil Works Tiang Baja
                                                                        Octagonal Steel 21 M Site Kembangan Utara-
 782      2-May-24              MANDIRI IDR             1220011559559   019                                                         26,628,138   24,886,110       2,737,472          995,444            26,628,138
                                                                        TRI BRATA ABADI, PT , Tagihan 100% atas
                                                                        Relokasi 1 Pekerjaan Instasi Tiang & ME
                                                                        Grounding & Accessories Pole Octagonal 21 M
 783      2-May-24              MANDIRI IDR             1220011559559   Site Duri Kosambi-027                                       35,703,293   33,367,563       3,670,432         1,334,702           35,703,293
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemindahan Tiang dan kabel Impact
                                                                        Pembangunan Rumah Warga site MP Pondok
 784      2-May-24              MANDIRI IDR             1220011559559   Kelapa-001                                                   2,143,195    2,198,148               -              54,953          2,143,195
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring Cluster Utan Kayu Utara
 785      2-May-24              MANDIRI IDR             1220011559559   site Utan Kayu Selatan-001                                   2,071,435    2,124,548               -              53,113          2,071,435
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring Cluster Rusun Tanah
 786      2-May-24              MANDIRI IDR             1220011559559   Abang site Kebon Kacang-007                                  1,005,955    1,031,748               -              25,793          1,005,955
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring Cluster Grand Orchad
 787      2-May-24              MANDIRI IDR             1220011559559   site Tugu Selatan-003                                        1,753,195    1,798,148               -              44,953          1,753,195
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Pole Cluster UKS RW01 site MP Utan
 788      2-May-24              MANDIRI IDR             1220011559559   Kayu Selatan-001                                             2,647,075    2,714,948               -              67,873          2,647,075
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Pole Cluster Perum Betawi Permai
 789      2-May-24              MANDIRI IDR             1220011559559   site MP Cilangkap-001                                        2,033,995    2,086,148               -              52,153          2,033,995
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        FO Cut Impact Hit by Truck Cluster site Jatiasih-
 790      2-May-24              MANDIRI IDR             1220011559559   001                                                          1,561,315    1,601,348               -              40,033          1,561,315
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Perbaikan Tiang Miring Cluster Lubang Buaya
 791      2-May-24              MANDIRI IDR             1220011559559   RW01 site MP Lubang Buaya-001                                1,530,505    1,569,748               -              39,243          1,530,505
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemindahan FAT 03-99 Permata Buana RW09
 792      2-May-24              MANDIRI IDR             1220011559559   site Kembangan Utara-015                                     1,520,950    1,559,948               -              38,998          1,520,950
Page 54
                                                                                                      Page 51
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                  NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK     DPP             PPN              PPh             NET DIBAYARKAN
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                        ONT GPON 1GE SC/APC Kebutuhan Q2 Batch 1
                                                                        sebanyak 4.722 Pcs (Pelunasan oleh SKBDN
 793      3-May-24              VICTORIA IDR             0880003577     135/SKBDN/X/23)                                          1,662,632,936   1,497,867,510    164,765,426                -        1,662,632,936
                                                                        METALOGIC INFOMITRA, PT , Pembelian Radio
                                                                        R5AC Lite Ubiquiti Sebanyak 40 Unit, Rocket
                                                                        Dish 5G 30dBi Light Weight RD 5G30 LW UBNT
 794      3-May-24              MANDIRI IDR             1220011559559   Sebanyak 40 Unit                                           154,201,200    138,920,000      15,281,200                -          154,201,200

                                                                        INDONESIA COMNETS PLUS, PT , Biaya Instalasi
                                                                        dan Sewa Local Loop 20Mbps untuk Kebutuhan
                                                                        Tenant PT Kyndryl Solutions Indonesia site IDC
                                                                        Duren Tiga Jl. Patriot, Sukagalih, Kec. Tarogong
 795      3-May-24              MANDIRI IDR             1220011559559   Kidul, Kab. Garut periode 16 - 31 Jan 2024                   5,295,291      4,858,065        534,387              97,161          5,295,291

                                                                        BLAO PRIMA PERKASA, PT , Tagihan 100% atas
                                                                        Paket Pekerjaan Jalur Relokasi Utilitas FO
                                                                        Impact Penataan Jaringan Utilitas Impact JPO
 796      3-May-24              MANDIRI IDR             1220011559559   Thamrin Jl.MH Thamrin - Jakarta Pusat (Batch 5)             80,058,400     73,280,000       8,060,800        1,282,400           80,058,400

                                                                        MANNA ABADI SEJAHTERA, PT , Tagihan 100%
                                                                        atas Pekerjaan Jalur Relokasi Jaringan Utilitas
                                                                        Fiber Optic Jl. Pati Kawasan Berorientasi Transit
 797      3-May-24              MANDIRI IDR             1220011559559   (KBT) Dukuh Atas - Kebon Melati-001                         79,385,705     72,664,260       7,993,069        1,271,624           79,385,705

                                                                        PLANET HARAPAN PENUH ENERGY, PT , Tagihan
                                                                        100% atas Paket Pekerjaan Relokasi Jaringan
                                                                        Utilitas Fiber Optic Impact Penataan Jaringan
 798      3-May-24              MANDIRI IDR             1220011559559   Utilitas Jl.KH.Noer Ali Phase 2 - Jatibening-017           130,913,620    119,829,400      13,181,234        2,097,014          130,913,620
                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT G-1425G-B
                                                                        Nokia sebanyak 2.000 Unit, dan ONT G-1425G-
 799      6-May-24              MANDIRI IDR             1220011559559   H Nokia sebanyak 8.000 Unit                                437,883,000    437,883,000             -                  -          437,883,000

                                                                        NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                        PT , DP 10% atas Pengadaan ONT G-1425G-B
                                                                        Nokia sebanyak 2.000 Unit, dan ONT G-1425G-
 800      6-May-24              MANDIRI IDR             1220011559559   H Nokia sebanyak 8.000 Unit - PPN                           48,167,130              -      48,167,130                -           48,167,130
                                                                        KOSMOS WAVELENGTH TECHNOLOGY, PT ,
                                                                        Tagihan Pelunasan 100% atas Pengadaan Cable
                                                                        Optical Drop SM 1 Core with Messenger 80M
                                                                        SC/APC sebanyak 1.000Pcs, 120M SC/APC
 801      7-May-24              MANDIRI IDR             1220011559559   sebanyak 1.000Pcs                                          199,800,000    180,000,000      19,800,000                -          199,800,000
                                                                        I NENGAH SUSASTRA , Biaya Pekerjaan
                                                                        Pemindahan Akses Point Corporate Delivery
                                                                        809614 Living World Denpasar (PO
                                                                        Rp.1.170.000,-Potongan PPh 21(2.5%)
 802      8-May-24              SINARMAS IDR             0002999994     Rp.29.250,- )                                                1,140,750      1,170,000             -               29,250          1,140,750
                                                                        I NENGAH SUSASTRA , Biaya Pekerjaan
                                                                        Penambahan Akses Point Corporate Delivery
                                                                        818966 PT. Berjaya Ekspansi Sukses (Chadol
                                                                        Gujeolpan) (PO Rp. 760.800,- Potongan PPh
 803      8-May-24              SINARMAS IDR             0002999994     21(2.5%) Rp.19.020,-)                                          741,780          760,800           -               19,020           741,780
Page 55
                                                                                                     Page 52
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                 NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        I NENGAH SUSASTRA , Biaya Pekerjaan
                                                                        Activation For New Services Corporate Delivery
                                                                        818972 PT. Josh Coffee Indonesia (Javabica
                                                                        Mall Bali Galeria) (PO Rp.2.090.800,- Potongan
 804      8-May-24              SINARMAS IDR             0002999994     PPh 21(2.5%) Rp.52.270,- )                                   2,038,530    2,090,800               -              52,270          2,038,530

                                                                        I NENGAH SUSASTRA , Biaya Pekerjaan
                                                                        Activation For New Services Corporate Delivery
                                                                        818846 PT. Degym Indonesia Dua Puluh Empat
                                                                        (Degym Park 23) (PO Rp.1.088.000,- Potongan
 805      8-May-24              SINARMAS IDR             0002999994     PPh 21(2.5%) Rp.27.200,-)                                    1,060,800    1,088,000               -              27,200          1,060,800
                                                                        FANAH JAYA MAINDO, PT , Pembelian Tools
                                                                        Optical Cable Binding Machine Sebanyak 2 Unit
 806      10-May-24             MANDIRI IDR             1220011559559   untuk Kebutuhan Patroli                                      9,441,660    8,506,000        935,660                  -            9,441,660
                                                                        FANAH JAYA MAINDO, PT , Pembelian
 807      10-May-24             MANDIRI IDR             1220011559559   Connector RJ45 Cat 5 Sebanyak 21.985 Pcs                    34,164,690   30,779,000       3,385,690                 -           34,164,690
                                                                        TOKOPEDIA, PT , Biaya Pengadaan Material ONT
                                                                        HG8145V5 HUAWEI 100 unit untuk Kebutuhan
 808      10-May-24             MANDIRI IDR             1220011559559   ONT Huawei IKR Batch 2                                      42,863,900   42,863,900               -                 -           42,863,900
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
                                                                        Selatan - JO Shimizu - Bangun Cipta Mega
 809      13-May-24             MANDIRI IDR             1220011559559   Kuningan Project                                             5,877,869    5,380,200        591,822               94,153          5,877,869
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 810      13-May-24             MANDIRI IDR             1220011559559   Selatan - PT Shinryo Indonesia                               2,960,566    2,709,900        298,089               47,423          2,960,566
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
                                                                        Selatan - PT. Kebayoran Puspita (Neo + Hotel
 811      13-May-24             MANDIRI IDR             1220011559559   Kebayoran)                                                   9,964,256    9,120,600       1,003,266          159,610             9,964,256
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Final as Build Jakarta
                                                                        Utara - Akses Site - Jl.Kalibaru Barat 1 Damkar -
 812      13-May-24             MANDIRI IDR             1220011559559   CCTV                                                         3,946,749    3,612,585        397,384               63,220          3,946,749
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Jakarta Utara - Akses Site - Jl. Plumpang Semper
 813      13-May-24             MANDIRI IDR             1220011559559   Raya Dishub                                                  4,096,514    3,749,670        412,463               65,619          4,096,514
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Jakarta Utara - Akses Site - Jl. Kramat Jaya Raya
 814      13-May-24             MANDIRI IDR             1220011559559   Dishub                                                       6,107,851    5,590,710        614,978               97,837          6,107,851
                                                                        MITRA MEDIA SELARAS, PT , Tagihan Retensi
                                                                        10% atas Pekerjaan Penarikan Kabel FO Final as
                                                                        Build Jakarta Utara - Akses Site - Jl. Kalibaru
 815      13-May-24             MANDIRI IDR             1220011559559   Barat 1 Damkar                                                 438,527         401,398         44,153             7,024           438,527
                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel FO Final as Build
                                                                        Jakarta Utara - Akses Site - Jl. Kerapu
 816      13-May-24             MANDIRI IDR             1220011559559   Kesbangpol                                                  15,089,135   13,811,565       1,519,272          241,702            15,089,135

                                                                        MITRA MEDIA SELARAS, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel FO Final as Build
 817      13-May-24             MANDIRI IDR             1220011559559   Jakarta Utara - Akses Site - Ancol Dishub                    8,304,710    7,601,565        836,172           133,027             8,304,710
                                                                        FIBEART TRANS NETWORK, PT , Tagihan 100%
                                                                        atas Pengadaan Steel Pole 9M Black Painting
 818      13-May-24             MANDIRI IDR             1220011559559   sebanyak 50 Unit                                            99,900,000   90,000,000       9,900,000                 -           99,900,000
Page 56
                                                                                                      Page 53
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                                  NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN

                                                                        DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Pusat - Akses Site - Patung
 819      13-May-24             MANDIRI IDR             1220011559559   Kuda Satpol PP (Compliment Site Radio)                          531,032         486,070         53,468             8,506           531,032

                                                                        DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                        Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                        Final as Build Jakarta Pusat - Akses Site - Balai
 820      13-May-24             MANDIRI IDR             1220011559559   Kota Satpol PP (Compliment Site Radio)                        1,247,756     1,142,110       125,632               19,986          1,247,756
                                                                        INFRA YES SOLUSINDO, PT , Jasa Penarikan dan
                                                                        Supervisi 12 SO Batch 68 di Apartement Green
 821      13-May-24             MANDIRI IDR             1220011559559   Pramuka                                                       4,116,000     4,200,000              -              84,000          4,116,000

                                                                        ARTHAN NUSA SENTOSA, PT , Tagihan 100%
                                                                        atas Pengadaan Cable Optical SM Drop 1 Core
 822      14-May-24             MANDIRI IDR             1220011559559   with Messenger SC/APC sebanyak 3.820 Unit                   555,843,600   500,760,000     55,083,600                 -          555,843,600
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Cable Network UTP Cat-6 No Connector
 823      14-May-24             MANDIRI IDR             1220011559559   Sebanyak 3.050 Mtr                                           21,812,776    19,651,150      2,161,626                 -           21,812,776
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Cable Network UTP CAT-5E 12.200 Mtr, Cable
                                                                        Network UTP Cat 6 With Conecctor 3M
 824      14-May-24             MANDIRI IDR             1220011559559   Sebanyak 50 Unit                                             68,320,500    61,550,000      6,770,500                 -           68,320,500
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
 825      14-May-24             MANDIRI IDR             1220011559559   Cable Power 2PIN 1.5M Sebanyak 90 Pcs                         1,398,600     1,260,000       138,600                  -            1,398,600
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        DIN Rail Power Supply AC to DC 48V 1.6A
 826      14-May-24             MANDIRI IDR             1220011559559   Sebanyak 150 Pcs                                             28,471,500    25,650,000      2,821,500                 -           28,471,500
                                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
                                                                        Cable Network UTP Cat 6 With Connector 3M
 827      14-May-24             MANDIRI IDR             1220011559559   Sebanyak 100 Unit                                             7,881,000     7,100,000       781,000                  -            7,881,000
                                                                        MONETI INDO TEKNO, PT , Pembelian Optical
                                                                        Laser Tester Sebanyak 5 Unit, Tools Crimping
 828      14-May-24             MANDIRI IDR             1220011559559   Tool RG6 Sebanyak 5 Pcs                                       1,498,500     1,350,000       148,500                  -            1,498,500
                                                                        BIBIT , Perbaikan Tiang Miring dan Kabel
                                                                        Distribusi Cluster Raya Kampial yang kendor
                                                                        karena tertimpa pohon sesuai TT.
                                                                        CALL001075963 dan FO Cut Akses Pantai
                                                                        Melasti tertimpa papan reklame sesuai TT.
 829      15-May-24             SINARMAS IDR             0002999994     J0314-038                                                     3,163,875     3,245,000              -              81,125          3,163,875
                                                                        BIBIT , Biaya Pekerjaan Perbaikan Tiang Roboh,
                                                                        Tiang Miring dan Kabel Kendor Link Tenant Villa
                                                                        Uuwatu sesuai TT. J0322-008 dan - Relokasi
                                                                        Tiang Feeder Cluster Bukit Pratama (PO
                                                                        Rp.4.062.678,- Potongan PPh 21(2.5%)
 830      15-May-24             SINARMAS IDR             0002999994     Rp.101.567,-)                                                 3,961,111     4,062,678              -          101,567             3,961,111
                                                                        BIBIT , Biaya Pekerjaan Pemasangan CCTV
                                                                        Analitic dan Hikvision Site Pantai Kuta & Hard
                                                                        Rock dan Pemasangan Duradus Support CCTV
                                                                        Site Pantai Legian (PO Rp.1.196.000,- Potongan
 831      15-May-24             SINARMAS IDR             0002999994     PPh 21(2.5%) Rp.29.900,-                                      1,166,100     1,196,000              -              29,900          1,166,100
                                                                        I NENGAH SUSASTRA , Pekerjaan Activation for
                                                                        New Services Corporate Delivery 818768 Kantor
                                                                        Kementrian Agama Kabupaten Badung (PO
                                                                        Rp.4.420.000,- Potongan PPh 21(2.5%)
 832      15-May-24             SINARMAS IDR             0002999994     Rp.110.500,-)                                                 4,309,500     4,420,000              -          110,500             4,309,500
Page 57
                                                                                                     Page 54
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        I KETUT DARTA , Biaya Pekerjaan Penarikan
                                                                        Kabel FO Link to 818910 Villa Antonio Uluwatu
                                                                        (PO Rp.1.762.800,- Potongan PPh 21(2.5%)
 833      15-May-24             SINARMAS IDR             0002999994     Rp.44.070,-)                                                1,718,730    1,762,800          -                44,070          1,718,730
                                                                        I KETUT DARTA , Biaya Pekerjaan Penambahan
                                                                        Pole FO di Customer 809614 Living Word
                                                                        Denpasar (PO Rp.2.988.889,- Potongan PPh
 834      15-May-24             SINARMAS IDR             0002999994     21(2.5%) Rp.74.722,-)                                       2,914,167    2,988,889          -                74,722          2,914,167

                                                                        IMAM TAUFIK , Biaya perbaikan FO Cut
                                                                        TT.J0402-012 link site 31 to BLL 08 Jln Dps-
                                                                        Singaraja,Mekarsari-Tabanan (PO Rp.2.347.100,-
 835      15-May-24             SINARMAS IDR             0002999994     Potongan PPh 21(2.5%) Rp.58.678,-)                          2,288,422    2,347,100          -                58,678          2,288,422

                                                                        BIBIT , Biaya perbaikan FO Cut TT.J0317-005 link
                                                                        GNY_04 to Sukawati_002 Jln. Ambarawati mas
                                                                        Ubud,Giayar (PO Rp.2.513.400,- Potongan PPh
 836      15-May-24             SINARMAS IDR             0002999994     21(2.5%)Rp.62.835,-)                                        2,450,565    2,513,400          -                62,835          2,450,565

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan FO Cut Impact Kabel Hit
 837      15-May-24             MANDIRI IDR             1220011559559   Kebakaran Site MP-Duren Sawit-002                           3,701,863    3,459,685     380,565           138,387             3,701,863
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Patroli Kabel Landai dan
                                                                        Tiang Miring Jovis Batch 9 Site MP-Cengkareng
 838      15-May-24             MANDIRI IDR             1220011559559   Barat-002                                                  10,369,889    9,691,485    1,066,063          387,659            10,369,889
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Pembuatan Handhole (HH) Concrete
 839      15-May-24             MANDIRI IDR             1220011559559   Akses Site Penjaringan-022                                 11,684,063   10,919,685    1,201,165          436,787            11,684,063
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Tiang FO Impact Proyek SDA
 840      15-May-24             MANDIRI IDR             1220011559559   Site Rawa Sari-004                                          5,636,422    5,267,684     579,445           210,707             5,636,422
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Relokasi Tiang FO Impact Complaint
 841      15-May-24             MANDIRI IDR             1220011559559   Warga Site MP-Sunter Jaya-001                               2,956,073    2,762,685     303,895           110,507             2,956,073

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Patroli Kabel Landai dan
 842      15-May-24             MANDIRI IDR             1220011559559   Tiang Miring Site MP-Kebon Jeruk-001                        3,588,657    3,353,885     368,927           134,155             3,588,657
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Patroli Kabel Landai dan
 843      15-May-24             MANDIRI IDR             1220011559559   Tiang Miring Site MP-Ancol-001                              7,468,262    6,979,684     767,765           279,187             7,468,262
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Patroli Jovis Kabel Landai
 844      15-May-24             MANDIRI IDR             1220011559559   dan Tiang Miring Site Babat-004                             5,462,012    5,104,684     561,515           204,187             5,462,012

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Patroli Kabel Landai dan
 845      15-May-24             MANDIRI IDR             1220011559559   Tiang Miring Site MP-Duri Kosambi-001                      11,646,399   10,884,485    1,197,293          435,379            11,646,399
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Restorasi FO Cut Impact
 846      15-May-24             MANDIRI IDR             1220011559559   Vandalisme Site MP-Kapuk-003                                3,344,055    3,125,285     343,781           125,011             3,344,055
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan FO Cut Impact Kabel PLN
 847      15-May-24             MANDIRI IDR             1220011559559   Terbakar Site Suka Damai-006                                3,771,413    3,524,685     387,715           140,987             3,771,413
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel Landai & Tiang
 848      15-May-24             MANDIRI IDR             1220011559559   Miring Site MP-Cipete Utara-001                             2,261,642    2,113,684     232,505               84,547          2,261,642
Page 58
                                                                                                    Page 55
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Pembuatan Handhole (HH) Concrete
 849      15-May-24             MANDIRI IDR             1220011559559   Akses Site - Pluit-035                                     13,616,483   12,725,685    1,399,825          509,027            13,616,483
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan FO Cut Impact Kabel
 850      15-May-24             MANDIRI IDR             1220011559559   Landai Site MP-Kayu Putih-001                               3,261,023    3,047,685     335,245           121,907             3,261,023
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel Landai & Tiang
 851      15-May-24             MANDIRI IDR             1220011559559   Miring Site MP-Manggarai Selatan-001                        1,724,503    1,611,685     177,285               64,467          1,724,503

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Restorasi FO Cut Impact
 852      15-May-24             MANDIRI IDR             1220011559559   Kabel Diputus Dinas PU Site Kadu Jaya-008                   2,062,623    1,927,685     212,045               77,107          2,062,623
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan FO Cut Impact Joint
                                                                        Closure (JC) Broken Didalam Tanah Site Kali
 853      15-May-24             MANDIRI IDR             1220011559559   Baru-012                                                    3,466,463    3,239,685     356,365           129,587             3,466,463

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Patroli Kabel Landai dan
 854      15-May-24             MANDIRI IDR             1220011559559   Tiang Miring Site MP-Kampung Melayu-001                     6,920,636    6,467,884     711,467           258,715             6,920,636
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan FO Cut Impact Kabel FO
 855      15-May-24             MANDIRI IDR             1220011559559   Landai Site Pluit-017                                       2,408,447    2,250,885     247,597               90,035          2,408,447
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Reroute Jalur Kabel Jaringan Listrik -
 856      15-May-24             MANDIRI IDR             1220011559559   Kebon Kosong-001                                           16,250,288   15,187,185    1,670,590          607,487            16,250,288
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan SR Cut Ducting Impact
 857      15-May-24             MANDIRI IDR             1220011559559   Kabel Stolen - Semper Timur-005                             2,612,603    2,441,685     268,585               97,667          2,612,603
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Galian Open Cut Impact Kabel Power
 858      15-May-24             MANDIRI IDR             1220011559559   Terbakar - Danau Sunter DII-003                             2,513,093    2,348,685     258,355               93,947          2,513,093
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Preventive Perbaikan Tiang Miring
                                                                        dan Perapihan Kabel Landai - MP-Sungai Bambu-
 859      15-May-24             MANDIRI IDR             1220011559559   001                                                         4,303,417    4,021,885     442,407           160,875             4,303,417
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Preventive Perbaikan Tiang Miring
                                                                        dan Perapihan Kabel Landai - MP-Sunter Jaya-
 860      15-May-24             MANDIRI IDR             1220011559559   001                                                         9,342,475    8,731,285     960,441           349,251             9,342,475
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Preventive Perbaikan Tiang Miring
                                                                        dan Perapihan Kabel Landai - MP-Rawa Buaya-
 861      15-May-24             MANDIRI IDR             1220011559559   001                                                         8,195,863    7,659,685     842,565           306,387             8,195,863
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Preventive Perbaikan Tiang Miring
                                                                        dan Perapihan Kabel Landai - MP-Kedoya
 862      15-May-24             MANDIRI IDR             1220011559559   Selatan-001                                                 6,918,069    6,465,485     711,203           258,619             6,918,069
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan FO Cut Impact Tiang FO
 863      15-May-24             MANDIRI IDR             1220011559559   Roboh - Tegal Alur-025                                      2,870,259    2,682,485     295,073           107,299             2,870,259
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Restorasi Penarikan Kabel Ducting
                                                                        Impact Pembangunan SDA Tangerang -
 864      15-May-24             MANDIRI IDR             1220011559559   Summarecon Mall Serpong                                    18,095,289   16,911,485    1,860,263          676,459            18,095,289
Page 59
                                                                                                    Page 56
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                             NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang dan Kabel Cluster
 865      15-May-24             MANDIRI IDR             1220011559559   Fajar Indah Regency site Kayuringin Jaya-015                5,215,912    4,874,684     536,215           194,987             5,215,912
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut impact Pemutusan Jalur KAI
 866      15-May-24             MANDIRI IDR             1220011559559   site Graha Menara Hijau                                     1,855,042    1,733,684     190,705               69,347          1,855,042
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut impact Pemutusan Binamarga
 867      15-May-24             MANDIRI IDR             1220011559559   site MP Utan Kayu Selatan-001                               2,241,312    2,094,684     230,415               83,787          2,241,312

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Kabel
                                                                        Landai site Diskominfo AP RW07, Bendungan
 868      15-May-24             MANDIRI IDR             1220011559559   Hilir, Tanah Abang, Jak-Pus                                 2,698,203    2,521,685     277,385           100,867             2,698,203

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Kabel
 869      15-May-24             MANDIRI IDR             1220011559559   Landai site Dishub Jl. Raya Bogor - Jl. Cibubur             2,392,183    2,235,685     245,925               89,427          2,392,183

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Kabel FO Corp. Plaza
 870      15-May-24             MANDIRI IDR             1220011559559   Senayan Impact Pembangunan Parkiran                         4,416,623    4,127,685     454,045           165,107             4,416,623

                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan FO Cut Feeder Impact Kabel Tanah
 871      15-May-24             MANDIRI IDR             1220011559559   Terbakar site MP Gunung Sahari Selatan-001                  4,077,005    3,810,285     419,131           152,411             4,077,005
                                                                        SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                        Pekerjaan Restorasi Satu8 Residence site MP
 872      15-May-24             MANDIRI IDR             1220011559559   Kedoya Selatan-001                                          4,451,933    4,160,685     457,675           166,427             4,451,933

                                                                        NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                        Pengadaan Bracket CCTV Bullet Arm Mounting
                                                                        Pole Fo Round sebanyak 69 Pcs, Bracket CCTV
 873      16-May-24             MANDIRI IDR             1220011559559   Bullet Arm Mounting JPO sebanyak 25 Pcs                    45,121,500   40,650,000    4,471,500                 -           45,121,500

                                                                        RIZKY MAJU ABADI, PT , Tagihan 100% atas
                                                                        Pekerjaan Bongkar Pasang Lampu PJU sebanyak
 874      17-May-24             MANDIRI IDR             1220011559559   5 lampu di 3 Lokasi Area Kota Semarang                      2,039,961    1,882,750     207,103               49,892          2,039,961
                                                                        KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                        100% atas Relokasi 2 (Dismantle & Re-Install)
                                                                        Perangkat Tenant Pole Steel Octagonal 21 M
 875      17-May-24             MANDIRI IDR             1220011559559   Site Semper Barat-010                                      27,369,926   25,052,563    2,755,782          438,419            27,369,926
                                                                        KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                        100% atas Relokasi 1 Pekerjaan Civil Work
                                                                        Telematika Tiang Beton 14/900 Site Karet
 876      17-May-24             MANDIRI IDR             1220011559559   Tengsin-016                                                23,996,074   21,964,369    2,416,081          384,376            23,996,074

                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 877      20-May-24             MANDIRI IDR             1220011559559   Jakarta Selatan - JPO Transjakarta Pasar Rumput             2,263,623    2,071,966     227,916               36,259          2,263,623
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 878      20-May-24             MANDIRI IDR             1220011559559   Jakarta Selatan - Jl. Raya Pasar Minggu-C13                 6,206,373    5,680,890     624,898               99,415          6,206,373
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
                                                                        Jakarta Selatan - Simpang Jl. Raya Pasar Minggu-
 879      20-May-24             MANDIRI IDR             1220011559559   C08                                                         1,292,664    1,183,216     130,154               20,706          1,292,664
Page 60
                                                                                                    Page 57
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                               NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP             PPN              PPh             NET DIBAYARKAN
                                                                        ALIANSI INOVASI GLOBAL, PT , Tagihan 90%
                                                                        atas Pekerjaan Penarikan Kabel Udara Final
 880      20-May-24             MANDIRI IDR             1220011559559   Jakarta Selatan - Jl. Raya Casablanca-003                  4,669,947    4,274,550        470,201               74,804          4,669,947
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Cluster Cilangkap
 881      20-May-24             MANDIRI IDR             1220011559559   RW02 site Cilangkap-010                                    1,756,705    1,801,748             -                45,043          1,756,705
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
 882      20-May-24             MANDIRI IDR             1220011559559   Tertabrak Truck site Kalideres-003                         1,842,115    1,889,348             -                47,233          1,842,115
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        tertabrak Truck site Diskominfo AP RW10,
 883      20-May-24             MANDIRI IDR             1220011559559   Semanan, Kalideres, Jak Bar                                1,981,735    2,032,548             -                50,813          1,981,735
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact Kabel
                                                                        Diputus Vandalisme site Diskominfo AP RW01,
 884      20-May-24             MANDIRI IDR             1220011559559   Meruya Selatan, Kembangan, Jak-Bar                         1,639,315    1,681,348             -                42,033          1,639,315
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan Kabel FO Cut Impact
                                                                        tertabrak Truck site Diskominfo AP RW05,
 885      20-May-24             MANDIRI IDR             1220011559559   Penggilingan, Cakung, Jak-Tim                              2,083,915    2,137,348             -                53,433          2,083,915
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Miring Impact Pole
                                                                        Miring site Diskominfo AP RW10, Semper
 886      20-May-24             MANDIRI IDR             1220011559559   Timur, Cilincing, Jak-Ut                                   1,471,615    1,509,348             -                37,733          1,471,615
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Miring Impact Pole
                                                                        Miring site Diskominfo AP RW08, Rawa Badak
 887      20-May-24             MANDIRI IDR             1220011559559   Utara, Koja, Jak-Ut                                          958,375         982,948          -                24,573           958,375
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Pemindahan Tiang Impact
                                                                        Permintaan Pemilik Lahan site Diskominfo AP
 888      20-May-24             MANDIRI IDR             1220011559559   RW02, Marunda, Cilincing, Jak-Ut                           1,289,875    1,322,948             -                33,073          1,289,875
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Perbaikan Tiang Miring Impact Pole
                                                                        Miring site Diskominfo AP RW05, Duri Kosambi,
 889      20-May-24             MANDIRI IDR             1220011559559   Cengkareng, Jak-Bar                                        1,400,635    1,436,548             -                35,913          1,400,635
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan kabel FO Cut Impact
                                                                        Vandalisme site Diskominfo AP RW04,
 890      20-May-24             MANDIRI IDR             1220011559559   Kuningan Barat, Mampang Prapatan, Jak-Sel                  1,717,315    1,761,348             -                44,033          1,717,315
                                                                        BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                        Pekerjaan Penarikan kabel FO Cut Impact
                                                                        Vandalisme site Diskominfo AP RW01,
 891      20-May-24             MANDIRI IDR             1220011559559   Kuningan Barat, Mampang Prapatan, Jak-Sel                  1,920,115    1,969,348             -                49,233          1,920,115

                                                                        RAJA AMERTHA DEWATA, PT , Biaya Pekerjaan
                                                                        Restorasi FO Link Site_06 By Pass to Site_07
                                                                        Kampial (PO Rp.22.330.559,- PPN Rp.2.212.938,-
 892      20-May-24             MANDIRI IDR             1220011559559   Potongan PPh 4(2) 1.75% Rp.352.058,-)                     21,978,501   20,117,621       2,212,938          352,058            21,978,501
                                                                        JABAR ENERGI KONSTRUKSI, PT , Tagihan 100%
                                                                        atas Pekerjaan Perluasan Jaringan PLN Daya
 893      20-May-24             MANDIRI IDR             1220011559559   10600 VA Pademangan Barat-002                             11,418,124   11,621,500             -            203,376            11,418,124

                                                                        JABAR ENERGI KONSTRUKSI, PT , Tagihan 100%
                                                                        atas Pekerjaan Perluasan Jaringan Instalasi PLN
 894      20-May-24             MANDIRI IDR             1220011559559   Daya 1300VA Jl. MH Thamrin-C06                            23,776,500   24,200,000             -            423,500            23,776,500
Page 61
                                                                                                    Page 58
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                            NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN

                                                                        JABAR ENERGI KONSTRUKSI, PT , Tagihan 100%
                                                                        atas Pekerjaan Perluasan Jaringan Instalasi PLN
 895      20-May-24             MANDIRI IDR             1220011559559   Daya 1300VA Jl. MH Thamrin-C12                            35,787,563   36,425,000          -            637,437            35,787,563
                                                                        JABAR ENERGI KONSTRUKSI, PT , Tagihan 100%
                                                                        atas Pekerjaan Perluasan Jaringan Instalasi PLN
 896      20-May-24             MANDIRI IDR             1220011559559   Daya 1300VA Jl. MH Thamrin-C8                              1,635,863    1,665,000          -                29,137          1,635,863

                                                                        JABAR ENERGI KONSTRUKSI, PT , Tagihan 100%
                                                                        atas Pekerjaan Perluasan Jaringan Instalasi PLN
 897      20-May-24             MANDIRI IDR             1220011559559   Daya 1300VA Jl. Jendral Sudirman C-12                      4,940,993    5,029,000          -                88,007          4,940,993
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 8 Core SC/UPC With Adaptor With
 898      21-May-24             MANDIRI IDR             1220011559559   Pigtail Sebanyak 25 Pcs                                    1,942,500    1,750,000     192,500                  -            1,942,500

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 899      21-May-24             MANDIRI IDR             1220011559559   Selatan - Terminal Pasar Minggu 2 Dishub                   7,702,683    7,050,510     775,556           123,383             7,702,683
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 900      21-May-24             MANDIRI IDR             1220011559559   Selatan - Site JPO SDN 03 DISHUB                           4,618,227    4,227,210     464,993               73,976          4,618,227

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 901      21-May-24             MANDIRI IDR             1220011559559   Selatan - Jl. Kemuning Raya Kesbangpol                     6,456,890    5,910,196     650,122           103,428             6,456,890

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 902      21-May-24             MANDIRI IDR             1220011559559   Selatan - Jl. Tanam Margasatwa Raya Dishub                 6,068,915    5,555,070     611,058               97,213          6,068,915

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 903      21-May-24             MANDIRI IDR             1220011559559   Selatan - Jl. Hj. Tutty Alawiyah Kesbangpol               10,795,593    9,881,550    1,086,970          172,927            10,795,593

                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 904      21-May-24             MANDIRI IDR             1220011559559   Selatan - Jl. Arteri Pondok Indah Dishub                   5,380,837    4,925,250     541,778               86,191          5,380,837
                                                                        MAHAGA PRATAMA, PT , Tagihan 90% atas
                                                                        Pekerjaan Penarikan Kabel Udara Final Jakarta
 905      21-May-24             MANDIRI IDR             1220011559559   Selatan - JPO Bung Karno Dishub                            1,778,587    1,627,996     179,080               28,489          1,778,587
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        MINI FDT Sebanyak 20 Unit untuk Kebutuhan
 906      21-May-24             MANDIRI IDR             1220011559559   Q1                                                        97,680,000   88,000,000    9,680,000                 -           97,680,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Rossette 8 Core SC/UPC With Adaptor With
                                                                        Pigtail Sebanyak 50 Pcs untuk Kebutuhan Stok
 907      21-May-24             MANDIRI IDR             1220011559559   Daily Februari                                             4,995,000    4,500,000     495,000                  -            4,995,000
                                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                        Cable Optical Drop SM 4Core With Mesenger
 908      21-May-24             MANDIRI IDR             1220011559559   Sebanyak 1.000 Mtr                                         2,109,000    1,900,000     209,000                  -            2,109,000
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Preventive
                                                                        Perbaikan Pole Miring dan Kabel Landai MP-
 909      21-May-24             MANDIRI IDR             1220011559559   Pasar Minggu-001                                           2,406,871    2,203,085     242,339               38,553          2,406,871
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Preventive
                                                                        Perbaikan Pole Miring dan Kabel Landai MP-
 910      21-May-24             MANDIRI IDR             1220011559559   Tanjung Barat-001                                          3,439,283    3,148,085     346,289               55,091          3,439,283
Page 62
                                                                                                     Page 59
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan FTTX

                                                                                                                                                              NILAI YANG DIBAYARKAN
          TANGGAL                                      NOMOR REKENING
       PENGELUARAN DI                                    BANK YANG
 NO.   BANK STATEMENT   REKENING BANK YANG DIGUNAKAN     DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP          PPN              PPh             NET DIBAYARKAN
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Paket Pekerjaan Relokasi
                                                                        Cable FO Aerial to Ducting Impact
 911      21-May-24             MANDIRI IDR             1220011559559   Pembangunan Tol Sinarmas                                    11,128,954   10,186,685    1,120,535          178,266            11,128,954
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Preventive
                                                                        Perbaikan Pole Miring dan Kabel Landai MP-
 912      21-May-24             MANDIRI IDR             1220011559559   Utan Kayu Selatan-001                                        4,210,807    3,854,285     423,971               67,449          4,210,807
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Preventive
                                                                        Perbaikan Pole Miring dan Kabel Landai MP-
 913      21-May-24             MANDIRI IDR             1220011559559   Ancol-001                                                    6,215,763    5,689,485     625,843               99,565          6,215,763
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Preventive
                                                                        Perbaikan Pole Miring dan Kabel Landai MP-
 914      21-May-24             MANDIRI IDR             1220011559559   Meruya Selatan-001                                           3,788,883    3,468,085     381,489               60,691          3,788,883
                                                                        BERKARYA BERSAMA JAYA TEKNOLOGI, PT ,
                                                                        Tagihan 100% atas Pekerjaan Preventive
                                                                        Perbaikan Pole Miring dan Kabel Landai MP-
 915      21-May-24             MANDIRI IDR             1220011559559   Sukabumi Utara-002                                           5,553,271    5,083,085     559,139               88,953          5,553,271
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Dismantle Kabel Corp PT Fastel Springhill
 916      21-May-24             MANDIRI IDR             1220011559559   Kemayoran site MP Kebon Kosong-011                           1,795,120    1,841,148          -                46,028          1,795,120
                                                                        UJANG DEDEN , Tagihan 100% atas Pekerjaan
                                                                        Pemindahan Tiang site Diskominfo AP RW14,
 917      21-May-24             MANDIRI IDR             1220011559559   Pisangan Timur, Pulo Gadung, Jak-tim                         2,533,195    2,598,148          -                64,953          2,533,195
                                                                        ALIANSI INOVASI GLOBAL, PT , Biaya Pekerjaan
                                                                        FTTB - 818888 Dinas Kominfo Kab. Gianyar - 21
                                                                        OPD 2024 - Kantor Dinas Ketahanan Pangan,
                                                                        Kelautan dan Perikanan - SPK No. 015/BTS/PS-
                                                                        BALI/SPK/II/2024) (PO Rp.4.259.625,- PPN
                                                                        Rp.422.125,- Potongan PPh 4(2) 1.75%
 918      22-May-24             SINARMAS IDR             0002999994     Rp.67.156,- )                                                4,192,469    3,837,500     422,125               67,156          4,192,469
                                                                        ALIANSI INOVASI GLOBAL, PT , Biaya Pekerjaan
                                                                        FTTB - 818889 Dinas Kominfo Kab. Gianyar - 21
                                                                        OPD 2024 - Dinas Pertanian - SPK No.
                                                                        017/BTS/PS-BALI/SPK/II/2024) (PO
                                                                        Rp.4.219.110,- PPN Rp.418.110,- Potongan PPh
 919      22-May-24             SINARMAS IDR             0002999994     4(2) 1.75% Rp.66.518,-)                                      4,152,592    3,801,000     418,110               66,518          4,152,592

                                                                        ALIANSI INOVASI GLOBAL, PT , Biaya Pekerjaan
                                                                        FTTB - 818882 Dinas Kominfo Kab. Gianyar - 21
                                                                        OPD 2024 - Kantor Kecamatan Gianyar - SPK No.
                                                                        016/BTS/PS-BALI/SPK/II/2024) (PO
                                                                        Rp.2.946.495,- PPN Rp.291.995,- Potongan PPh
 920      22-May-24             SINARMAS IDR             0002999994     4(2) 1.75% Rp.46.454,-)                                      2,900,041    2,654,500     291,995               46,454          2,900,041
                                                                        BIBIT , Biaya Pekerjaan Perbaikan Kabel Feeder
                                                                        yang jatuh dan tiang Distribusi miring di Cluster
                                                                        Taman Mumbul dan Taman Werdi (PO
                                                                        Rp.1.906.148,- Potongan PPh 21(2.5%)
 921      22-May-24             SINARMAS IDR             0002999994     Rp.47.654,-)                                                 1,858,494    1,906,148          -                47,654          1,858,494
                                                                        BIBIT , Biaya Pekerjaan Dismantle Radio
                                                                        Wireless R5AC Lite Ubiquity dan Rocket UBNT
                                                                        PT. Bangga Merah Putih (Event Barati Cup) ( PO
                                                                        Rp.1.525.495,- Potongan PPh 21(2.5%)
 922      22-May-24             SINARMAS IDR             0002999994     Rp.38.137,- )                                                1,487,358    1,525,495          -                38,137          1,487,358
Page 63

          
Page 64
                                                                                                Page 1
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  ACHMAD SYAMSUL RIZAL , Tagihan 100% atas
                                                                  Pekerjaan Instalasi DC Power Site Kedanyang-
 1       2-Oct-23         MANDIRI IDR          1220011559559      002                                                           4,620,525    4,739,000           -          118,475         4,620,525
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test dan
 2       2-Oct-23         MANDIRI IDR          1220011559559      Analisa Pondasi site Sukadamai-006                            4,837,500    4,500,000      495,000         157,500         4,837,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test dan
 3       2-Oct-23         MANDIRI IDR          1220011559559      Analisa Pondasi site Baha-001                                 4,837,500    4,500,000      495,000         157,500         4,837,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test dan
 4       2-Oct-23         MANDIRI IDR          1220011559559      Analisa Pondasi site Kekeran-001                              4,837,500    4,500,000      495,000         157,500         4,837,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test site
 5       2-Oct-23         MANDIRI IDR          1220011559559      Kotabaru-006                                                  3,762,500    3,500,000      385,000         122,500         3,762,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test dan
 6       2-Oct-23         MANDIRI IDR          1220011559559      Analisa Pondasi site Cibeureum Hilir-001                      4,837,500    4,500,000      495,000         157,500         4,837,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test site
 7       2-Oct-23         MANDIRI IDR          1220011559559      Buduk-001                                                     3,762,500    3,500,000      385,000         122,500         3,762,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test site
 8       2-Oct-23         MANDIRI IDR          1220011559559      Benoa-016                                                     3,762,500    3,500,000      385,000         122,500         3,762,500
                                                                  HANDASA KONSULTAN, PT , Jasa Analisa Pondasi
 9       2-Oct-23         MANDIRI IDR          1220011559559      site Pecatu-003                                               1,075,000    1,000,000      110,000          35,000         1,075,000
                                                                  HANDASA KONSULTAN, PT , Jasa Survey dan
 10      2-Oct-23         MANDIRI IDR          1220011559559      Analisa site Raya Sading M_86                                 4,837,500    4,500,000      495,000         157,500         4,837,500
                                                                  HANDASA KONSULTAN, PT , Jasa Survey dan
 11      2-Oct-23         MANDIRI IDR          1220011559559      Analisa site Gajah Sura M_75                                  3,225,000    3,000,000      330,000         105,000         3,225,000
                                                                  HANDASA KONSULTAN, PT , Jasa Survey dan
 12      2-Oct-23         MANDIRI IDR          1220011559559      Analisa site Pipitan (Dalung Selatan) M_18                    3,225,000    3,000,000      330,000         105,000         3,225,000
                                                                  HANDASA KONSULTAN, PT , Jasa Survey dan
 13      2-Oct-23         MANDIRI IDR          1220011559559      Analisa site Pecatu Kangin M_58                               3,225,000    3,000,000      330,000         105,000         3,225,000

                                                                  MONDIAL TEKNOLOGI INDONESIA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Jakarta Timur - Akses Site Relokasi Kegiatan
 14      2-Oct-23         MANDIRI IDR          1220011559559      Strategis Daerah 2022 - Jalan Layur Tahap 1                  65,473,522   60,427,800     6,647,058      1,601,336        65,473,522
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Repair Kabel Link Backbone Pulo Sirih
                                                                  to BSC H3I Bekasi Impact RSL Low Site Pulo Sirih
 15      2-Oct-23         MANDIRI IDR          1220011559559      Utama MP                                                      2,711,241    2,481,685      272,985          43,429         2,711,241
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Repair Kabel Link Backbone Impact
 16      2-Oct-23         MANDIRI IDR          1220011559559      Kabel Link BB Broken Site MP-Suka Pura-001                    2,558,291    2,341,685      257,585          40,979         2,558,291
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel Landai dan Tiang
 17      2-Oct-23         MANDIRI IDR          1220011559559      Miring FO Site MP-Sukabumi Utara-002                          7,213,215    6,602,485      726,273         115,543         7,213,215
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Ducting Impact
 18      2-Oct-23         MANDIRI IDR          1220011559559      Galian PDAM Site MP-Cideng-002                                4,152,249    3,800,685      418,075          66,511         4,152,249

                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan dan Install HH Concrete FO
 19      2-Oct-23         MANDIRI IDR          1220011559559      Cut Ducting Impact JC Broken Site MP-Ancol-001                6,597,264    6,038,685      664,255         105,676         6,597,264
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2nd Bordest Site Duri Kosambi-
 20      2-Oct-23         MANDIRI IDR          1220011559559      037                                                           1,131,000    1,160,000           -           29,000         1,131,000
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2nd Bordest Site Pejaten Timur-
 21      2-Oct-23         MANDIRI IDR          1220011559559      029                                                           1,131,000    1,160,000           -           29,000         1,131,000

                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
 22      2-Oct-23         MANDIRI IDR          1220011559559      Pekerjaan Install 2nd Bordest Site Jelambar-005               1,131,000    1,160,000           -           29,000         1,131,000
Page 65
                                                                                               Page 2
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
 23      2-Oct-23         MANDIRI IDR          1220011559559      Pekerjaan Install 2nd Bordest Site Gambir-005               1,131,000    1,160,000           -           29,000         1,131,000
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2nd Bordest Site Karet
 24      2-Oct-23         MANDIRI IDR          1220011559559      Semanggi-008                                                1,131,000    1,160,000           -           29,000         1,131,000
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2nd Bordest Site Tanah Tinggi-
 25      2-Oct-23         MANDIRI IDR          1220011559559      001                                                         1,131,000    1,160,000           -           29,000         1,131,000
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2nd Bordest Site Sepanjang Jaya-
 26      2-Oct-23         MANDIRI IDR          1220011559559      003                                                         1,131,000    1,160,000           -           29,000         1,131,000
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2nd Bordest Site Pademangan
 27      2-Oct-23         MANDIRI IDR          1220011559559      Barat-008                                                   1,131,000    1,160,000           -           29,000         1,131,000
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2nd Bordest Site Petamburan-
 28      2-Oct-23         MANDIRI IDR          1220011559559      008                                                         1,131,000    1,160,000           -           29,000         1,131,000
                                                                  BERANI INOVASI INDONESIA, PT , Tagihan 100%
                                                                  atas Relokasi 1 Pekerjaan Instalasi Tiang & ME
                                                                  Grounding & Accessories Pole Octagonal 21 M
 29      2-Oct-23         MANDIRI IDR          1220011559559      Site Duri Kosambi-031                                      33,716,991   34,634,813           -          917,822        33,716,991
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
                                                                  MCP Pole 21M sebanyak 20 Unit ( XL Project) -
 30      3-Oct-23         MANDIRI IDR          1220011559559      PPN                                                        73,843,440          -      73,843,440             -         73,843,440
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan MCP Pole 21M sebanyak 10 Unit
 31      3-Oct-23         MANDIRI IDR          1220011559559      ( XL Project) - PPN                                        83,298,424          -      83,298,424             -         83,298,424
                                                                  IWAN SOFYAN , Tagihan 100% atas Pekerjaan
 32      5-Oct-23         MANDIRI IDR          1220011559559      Perbaikan FO site Cibeureum-008                               556,175     570,435            -           14,260          556,175

                                                                  YUYUN MUNADHI , Tagihan 100% atas Pekerjaan
 33      5-Oct-23         MANDIRI IDR          1220011559559      Perbaikan Tiang FO Jalur site Urip Sumoharjo MP            1,114,334     1,142,906           -           28,572         1,114,334
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Combat Tibubeneng-002 dan
 34      6-Oct-23         SINARMAS IDR          0002999994        Biaya Admin+layanan tokped Rp.6.000,-                      7,977,300     7,977,300           -               -          7,977,300
                                                                  EDI SLAMET , Biaya Pekerjaan Collocation XL Site
                                                                  M_69 Catur 2(PO Rp.3.384.840,- Potongan PPh
 35      6-Oct-23         SINARMAS IDR          0002999994        21(2.5%) Rp.84.621,-                                       3,300,219     3,384,840           -           84,621         3,300,219
                                                                  PLN PERSERO, PT , Pembelian Pulsa Listrik untuk
 36      6-Oct-23         SINARMAS IDR          0002999994        Site Kerobokan Kelod_024                                   1,003,500     1,003,500           -               -          1,003,500
                                                                  AREA BADUNG , Pengajuan Pembayaran
                                                                  (Pertama) Bulan September 2023 Sewa lahan
                                                                  Site 499513 Combat Tibubeneng_002 (PO
                                                                  Rp.5.000.000,- Potongan PPh 4(2) 10%
 37      6-Oct-23         SINARMAS IDR          0002999994        Rp.500.000,- )                                             4,500,000     5,000,000           -          500,000         4,500,000
                                                                  PEMERINTAH KABUPATEN BADUNG , Biaya Sewa
                                                                  lahan Milik Pemkab Badung Untuk 9 Site Selama
 38      6-Oct-23         SINARMAS IDR          0002999994        5 Tahun Periode 2023-2028                                 14,560,000    14,560,000                                     14,560,000
                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan kontribusi Site
                                                                  751213 Tuban_010(PO Rp.21.494.842,-
 39      6-Oct-23         SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.494.842,-)                         21,000,000    21,494,842           -          494,842        21,000,000
                                                                  BIBIT, Mr , Biaya Pekerjaan Perbaikan FO Cut Link
                                                                  Site_45 To Site_47 & Site_25 (TT.I0829-013) -
                                                                  Jln. Nakula, Badung.(PO Rp.4.766.000,-
 40      6-Oct-23         SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.428.940,- )                         4,337,060     4,766,000           -          428,940         4,337,060
Page 66
                                                                                               Page 3
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  BIBIT, Mr , Biaya Pekerjaan Perbaikan Tiang
                                                                  Miring P7_15 Link Aksess Kesiman Kertalangu-
                                                                  007, P7_08 Link Aksess DPS_41 dan Pergantian
                                                                  Tiang P7_10 Link Aksess Kesiman Kertalangu-
                                                                  007(PO Rp.1.441.436,- Potongan PPh 21(9%)
 41      6-Oct-23         SINARMAS IDR          0002999994        Rp.1.311.707,- )                                            1,311,707      1,441,436            -          129,729         1,311,707

                                                                  AREA BADUNG , Akuisisi sewa lahan Site 751213
                                                                  Tuban_010 seluas 4 m2, jangka waktu 10 tahun
                                                                  periode 2023-2033 (PO Rp.222.222.222,-
 42      9-Oct-23         MANDIRI IDR          1220011559559      Potongan PPh 4(2) 10% Rp.22.222.222,-)                    200,000,000    222,222,222            -       22,222,222       200,000,000
                                                                  AREA BADUNG , Akuisisi sewa lahan Site 751168
                                                                  Tumbak Bayuh _003 seluas 4 m2, jangka waktu
                                                                  10 tahun periode 2023-2033 (PO
                                                                  Rp.277.777.777,- Potongan PPh 4(2) 10%
 43      9-Oct-23         MANDIRI IDR          1220011559559      Rp.27.777.777,-                                           250,000,000    277,777,777            -       27,777,777       250,000,000
                                                                  METALOGIC INFOMITRA, PT , Pembelian
                                                                  Mikrotik Power Supply CCR1036-12G-4S
 44      10-Oct-23        MANDIRI IDR          1220011559559      Sebanyak 2 Unit                                             1,209,900      1,090,000       119,900              -          1,209,900
                                                                  PANCA PUTRA SOLUSINDO, PT , Pembelian
                                                                  Mikrotik Bits Ainos v3 RoS Level 6 Sebanyak 1
 45      10-Oct-23        MANDIRI IDR          1220011559559      Unit                                                       26,529,000     23,900,000      2,629,000             -         26,529,000
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
                                                                  Pengadaan Material 2nd Bordes MCP 21M
 46      10-Oct-23        MANDIRI IDR          1220011559559      sebanyak 30 Set - PPN                                       1,820,783             -       1,820,783             -          1,820,783
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
 47      10-Oct-23        MANDIRI IDR          1220011559559      MP 30M Light sebanyak 1 Set - PPN                           4,023,003             -       4,023,003             -          4,023,003
                                                                  SURYA ANUGRAH ENJINERING, PT , Pembelian
                                                                  Panel ACPDB Type 1 Tsel ISAT Box L 700MM W
 48      10-Oct-23        MANDIRI IDR          1220011559559      400MM T 210MM Sebanyak 10 Pcs                              81,030,000     73,000,000      8,030,000             -         81,030,000
                                                                  DIAN MUSTIKA AGUNG, PT , Pembelian Alat test
                                                                  Grounding Kyoritsu 4105A Earth Tester
                                                                  Sebanyak 1 Unit untuk Penggantian Kerusakan
 49      10-Oct-23        MANDIRI IDR          1220011559559      alat Milik Team Maintenance,dll                            11,173,260     10,066,000      1,107,260             -         11,173,260
                                                                  NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                  PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                  Switch Nokia 7210 MXP Chasis SAS-MXP
                                                                  22F2C4SFP+ETR-48VDC sebanyak 121unit
 50      11-Oct-23        VICTORIA IDR          0880003577        (Pelunasan oleh SKBDN No.131SKBDN/III/23)               4,029,079,375   3,629,801,239   399,278,136             -      4,029,079,375
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U Rack 19Inch dan Modular
                                                                  ACPDB DCPDB 3 Phase masing-masing sebanyak
 51      11-Oct-23        MANDIRI IDR          1220011559559      5 Unit                                                    218,670,000    197,000,000     21,670,000             -        218,670,000

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
 52      11-Oct-23        MANDIRI IDR          1220011559559      Pengadaan ODC Pedestal 2X27U sebanyak 5 Unit              148,761,667    134,019,520     14,742,147             -        148,761,667
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Bandung - Akses Site RK0004 - Office
 53      11-Oct-23        MANDIRI IDR          1220011559559      Bandung (FO Koneksi Bandung-Cimahi)                        67,415,534     62,220,150      6,844,217      1,648,833        67,415,534
                                                                  KALIABANG JAYA PRATAMA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Barat - Akses Site - Proteksi OLT Kapuk-
 54      11-Oct-23        MANDIRI IDR          1220011559559      009                                                         9,692,125      8,945,200       983,972         237,047         9,692,125
                                                                  SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                  100% atas Relokasi 1 Pekerjaan Instalasi Tiang &
                                                                  ME Grounding & Accessories Pole Octagonal 21
 55      11-Oct-23        MANDIRI IDR          1220011559559      M Site Duren Jaya-005                                      36,180,842     33,392,563      3,673,182        884,903        36,180,842
Page 67
                                                                                              Page 4
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN

                                                                  SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
 56      11-Oct-23        MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Semper Barat-010            26,964,100   24,886,110     2,737,472        659,482        26,964,100
                                                                  SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                  100% atas Relokasi 1 Pekerjaan Instalasi Tiang &
                                                                  ME Grounding & Accessories Pole Octagonal 21
 57      11-Oct-23        MANDIRI IDR          1220011559559      M Site Pademangan Timur-006                                36,153,755   33,367,563     3,670,432        884,240        36,153,755
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Patroli Tiang Miring dan Kabel Landai
                                                                  dan Pemasangan Accessories Site MP-
 58      11-Oct-23        MANDIRI IDR          1220011559559      Kembangan Selatan-001                                       3,024,146    3,269,347           -          245,201         3,024,146
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Kabel Jumper, Perbaikan Tiang Miring,
                                                                  Kabel Landai dan Pemasangan Accessories Site
 59      11-Oct-23        MANDIRI IDR          1220011559559      MP-Wijaya Kesuma-001                                        3,998,579    4,322,788           -          324,209         3,998,579
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Relokasi 1 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Pole Beton 14/900 daN Site
 60      11-Oct-23        MANDIRI IDR          1220011559559      Kradenan-004                                               21,914,368   20,225,535     2,224,809        535,976        21,914,368
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Additional ME Grounding &
                                                                  Accessories Telematika 14/900 Site Kebondalem-
 61      11-Oct-23        MANDIRI IDR          1220011559559      001                                                         5,092,450    4,700,000      517,000         124,550         5,092,450
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Additional ME Grounding &
                                                                  Accessories Pole Octagonal 21 M Site Miroto-
 62      11-Oct-23        MANDIRI IDR          1220011559559      006                                                         6,922,855    6,389,344      702,828         169,317         6,922,855
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Additional 2 ME Grounding
                                                                  & Accessories Pole Steel Octagonal 21 M Site
 63      11-Oct-23        MANDIRI IDR          1220011559559      Miroto-006                                                  5,092,450    4,700,000      517,000         124,550         5,092,450
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Additional ME Grounding &
                                                                  Accessories Telematika 14/900 Site Panjang Baru-
 64      11-Oct-23        MANDIRI IDR          1220011559559      001                                                         5,092,450    4,700,000      517,000         124,550         5,092,450
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan ME Grounding &
                                                                  Accessories Telematika Tiang Beton 14/900 Site
 65      11-Oct-23        MANDIRI IDR          1220011559559      Kabunan-001                                                17,235,031   15,906,812     1,749,749        421,530        17,235,031
                                                                  KALIABANG JAYA PRATAMA, PT , Tagihan 100%
                                                                  atas Pekerjaan Additional ME Grounding &
                                                                  Accessories Monopole Oktagonal 26 M Site
 66      11-Oct-23        MANDIRI IDR          1220011559559      Kedanyang-002                                               3,860,782    3,563,251      391,957          94,426         3,860,782
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact Proyek
 67      11-Oct-23        MANDIRI IDR          1220011559559      MRT Site Gambir-027                                         1,902,123    1,777,685      195,545          71,107         1,902,123
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO CCTV Link Site
 68      11-Oct-23        MANDIRI IDR          1220011559559      Pisangan Timur-014                                          2,927,183    2,735,685      300,925         109,427         2,927,183
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Hit by Truck
 69      11-Oct-23        MANDIRI IDR          1220011559559      Site MP-Ancol-001                                           3,200,675    2,991,285      329,041         119,651         3,200,675
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Kabel Landai
 70      11-Oct-23        MANDIRI IDR          1220011559559      Site Situ Gadung-003                                        2,865,123    2,677,685      294,545         107,107         2,865,123
Page 68
                                                                                              Page 5
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                     NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Penertiban
 71      11-Oct-23        MANDIRI IDR          1220011559559      PU DKI Jakarta Site MP-Cibubur-001                        2,352,807    2,198,885      241,877          87,955         2,352,807

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Penertiban
 72      11-Oct-23        MANDIRI IDR          1220011559559      PU DKI Jakarta Site MP-Kelapa Gading Barat-002            2,903,001    2,713,085      298,439         108,523         2,903,001

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Pemasangan Tiang FO 9mtr dan
 73      11-Oct-23        MANDIRI IDR          1220011559559      Perbaikan Kabel FO Site Pegangsaan Dua-035                4,779,567    4,466,885      491,357         178,675         4,779,567
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Patroli Kabel dan Tiang
 74      11-Oct-23        MANDIRI IDR          1220011559559      Miring Site Kayu Putih-016                                3,032,471    2,834,085      311,749         113,363         3,032,471
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan FO Galian HDPE Akses Site
 75      11-Oct-23        MANDIRI IDR          1220011559559      Nusajaya-001                                              2,839,443    2,653,685      291,905         106,147         2,839,443
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Patroli Kabel Landai dan
 76      11-Oct-23        MANDIRI IDR          1220011559559      Tiang Miring Site Tegal Alur-008                          5,800,922    5,421,422      596,356         216,856         5,800,922
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Reroute
                                                                  Impact Vandalisme Site Summarecon Mall
 77      11-Oct-23        MANDIRI IDR          1220011559559      Serpong                                                   2,366,503    2,211,685      243,285          88,467         2,366,503
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO CCTV Link Site
 78      11-Oct-23        MANDIRI IDR          1220011559559      Ancol-015                                                 2,530,213    2,364,685      260,115          94,587         2,530,213
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact
 79      11-Oct-23        MANDIRI IDR          1220011559559      Vandanlisme Site Ratujaya-014                             2,602,973    2,432,685      267,595          97,307         2,602,973
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact Kabel
 80      11-Oct-23        MANDIRI IDR          1220011559559      PLN Terbakar Site MP-Batu Ampar-002                       2,637,427    2,464,885      271,137          98,595         2,637,427
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Link CCTV Ducting Puri
 81      11-Oct-23        MANDIRI IDR          1220011559559      Kencana BK                                                7,031,309    6,571,316      722,845         262,852         7,031,309

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Backbone
 82      11-Oct-23        MANDIRI IDR          1220011559559      Impact Hit by Truck Site MP-Tugu Utara-001                4,198,343    3,923,685      431,605         156,947         4,198,343
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact Hit by
 83      11-Oct-23        MANDIRI IDR          1220011559559      Truck Site MP-Tanjung Barat-001                           2,608,323    2,437,685      268,145          97,507         2,608,323
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Hit by Truck
 84      11-Oct-23        MANDIRI IDR          1220011559559      Site MP-Kebon Jeruk-001                                   3,598,287    3,362,885      369,917         134,515         3,598,287
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact
                                                                  Penertiban Dinas Binamarga Site Tegal Parang-
 85      11-Oct-23        MANDIRI IDR          1220011559559      002                                                       2,558,675    2,391,285      263,041          95,651         2,558,675

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel Landai dan Tiang
 86      11-Oct-23        MANDIRI IDR          1220011559559      Miring Jovis Batch 7 Site MP-Tugu Utara-001               4,136,283    3,865,685      425,225         154,627         4,136,283

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Reroute Impact
 87      11-Oct-23        MANDIRI IDR          1220011559559      Proyek SDA Site MP-Kelapa Gading Barat-001               11,538,543   10,783,685     1,186,205        431,347        11,538,543
Page 69
                                                                                               Page 6
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Pemasangan Tiang FO 9mtr dan
 88      11-Oct-23        MANDIRI IDR          1220011559559      Perbaikan Kabel FO Site Jelambar Baru-009                    3,358,393    3,138,685      345,255         125,547         3,358,393
                                                                  I KETUT DARTA , Pengurusan NIDI dan SLO Daya
                                                                  7700 VA untuk Site 751187 Jimbaran-019(PO
                                                                  Rp.690.000,- Potongan PPh 21(2.5%) Rp.17.250,-
 89      12-Oct-23        SINARMAS IDR          0002999994        )                                                             672,750      690,000            -           17,250          672,750
                                                                  I KETUT DARTA , Pengurusan NIDI dan SLO Daya
                                                                  7700 VA untuk Site 751224 Kuta-027(PO
                                                                  Rp.690.000,- Potongan PPh 21(2.5%) Rp.17.250,-
 90      12-Oct-23        SINARMAS IDR          0002999994        )                                                             672,750      690,000            -           17,250          672,750
                                                                  I KETUT DARTA , Pengurusan NIDI dan SLO Daya
                                                                  7700 VA untuk Site 751236 Kedonganan-006 (PO
                                                                  Rp.690.000,- Potongan PPh 21(2.5%) Rp.17.250,-
 91      12-Oct-23        SINARMAS IDR          0002999994        )                                                             672,750      690,000            -           17,250          672,750
                                                                  I KETUT DARTA , Pengurusan NIDI dan SLO Daya
                                                                  7700 VA untuk site Dalung_003 (PO
                                                                  Rp.1.905.000,- Potongan PPh 21(2.5%)
 92      12-Oct-23        SINARMAS IDR          0002999994        Rp.47.625,- )                                                1,857,375    1,905,000           -           47,625         1,857,375
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Pekerjaan
                                                                  Instalasi Power DC untuk site 751032 Legian-
                                                                  002(PO Rp.3.145.622,- PPN Rp.311.728,-
 93      12-Oct-23        SINARMAS IDR          0002999994        Potongan PPh 4(2) 1.75% Rp.49.593,- )                        3,096,029    2,833,894      311,728          49,593         3,096,029
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Pekerjaan
                                                                  Instalasi Power DC untuk site Kerobokan-004(PO
                                                                  Rp.3.145.622,- PPN Rp.311.728,- Potongan PPh
 94      12-Oct-23        SINARMAS IDR          0002999994        4(2) 1.75% Rp.49.593,- )                                     3,096,029    2,833,894      311,728          49,593         3,096,029
                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan kontribusi Site
                                                                  211246 Ungasan_009 (PO Rp.11.185.565,-
 95      12-Oct-23        SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.185.565,                             11,000,000   11,185,565           -          185,565        11,000,000
                                                                  IMAM TAUFIK , Biaya Pekerjaan Perbaikan FO
                                                                  Cut Link Site_25 Kerobokan to Site_18 Muding
                                                                  Kaja (TT. I0911-001) Jln. Raya Canggu-
                                                                  Kerobokan(PO Rp.1.653.300,- Potongan PPh
 96      12-Oct-23        SINARMAS IDR          0002999994        21(3%) Rp.49.599,-)                                          1,603,701    1,653,300           -           49,599         1,603,701
                                                                  IMAM TAUFIK , Biaya Pekerjaan Perbaikan FO
                                                                  Cut Link Protection SF Gajah Mada to SF Monang
                                                                  Maning (TT.I0904-005) Jln. Gajah Mada -
                                                                  Denpasar(PO Rp.2.210.000,- Potongan PPh
 97      12-Oct-23        SINARMAS IDR          0002999994        21(3%) Rp.66.300,-)                                          2,143,700    2,210,000           -           66,300         2,143,700
                                                                  BIBIT, Mr , Biaya Pekerjaan Perbaikan FO Cut Link
                                                                  Aksess Site_20 dan M_48 (TT.I0919-012 &
                                                                  TT.I0919-013) Ngaben ? Ungasan(PO
                                                                  Rp.1.605.800,-Potongan PPh 21(9%) Rp.144.522,-
 98      12-Oct-23        SINARMAS IDR          0002999994        )                                                            1,461,278    1,605,800           -          144,522         1,461,278

                                                                  BIBIT, Mr , Biaya Perbaikan Kabel FO Aksess S95
                                                                  tertimpa pohon di gawang P7_48 SS to P7_49
                                                                  serta perbaikan verticality P7_48 SS dan P7_41
                                                                  SS Jln. Meliling Tabanan(PO Rp.1.336.787,-
 99      12-Oct-23        SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.120.311,- )                           1,216,476    1,336,787           -          120,311         1,216,476

                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Strengthening MP 30M
100      16-Oct-23        MANDIRI IDR          1220011559559      3 System site M62 Goa Gong sebanyak 1 Set                   64,879,512   58,450,011     6,429,501             -         64,879,512
Page 70
                                                                                               Page 7
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN

                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Strengthening MP 30M
101      16-Oct-23        MANDIRI IDR          1220011559559      3 System site Taman Jimbaran sebanyak 1 Set                79,365,000     71,500,000      7,865,000             -         79,365,000
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Strengthening MP 20M
                                                                  Radome site M206 Sanggar Buana sebanyak 1
102      16-Oct-23        MANDIRI IDR          1220011559559      Set                                                        62,992,500     56,750,000      6,242,500             -         62,992,500
                                                                  PLN PERSERO, PT , Biaya registrasi upgrade PLN
                                                                  site Kerobokan Kelod-024 dan Biaya Admin
103      17-Oct-23        SINARMAS IDR          0002999994        Rp.5.000,-                                                 11,264,700     11,264,700            -               -         11,264,700

                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan kontribusi Site
                                                                  751200 Kerobokan Kelod-025(PO Rp.24.371.130,-
104      17-Oct-23        SINARMAS IDR          0002999994         Potongan PPh 21(3%) Rp.371.130,- )                        24,000,000     24,371,130                       371,130        24,000,000
                                                                  AREA BADUNG , Akuisisi site 211247 Jimbaran
                                                                  029 seluas lahan 9 m2, jangka waktu 10 tahun
                                                                  periode 2023-2033(PO Rp.211.111.111,-
105      17-Oct-23        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 10% Rp.21.111.111,-)                    190,000,000    211,111,111            -       21,111,111       190,000,000

                                                                  GEMA PUTRA TUNGGAL MAKMUR, PT , Tagihan
                                                                  100% atas Pekerjaan Relokasi Jaringan Utilitas
                                                                  Fiber Optic Jl.Raya Cisauk - Impact Flyover
106      17-Oct-23        MANDIRI IDR          1220011559559      Cisauk Kab.Tanggerang Site Curug Wetan-006                138,719,095    126,974,000     13,967,140      2,222,045       138,719,095
                                                                  RONA PERSADA ANGKASA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Pusat - Akses Site - Relokasi Kawasan
                                                                  Pasar Baru (Jl.Antara - Jl.Pasar Baru Selatan -
107      19-Oct-23        MANDIRI IDR          1220011559559      Timur dan Jl.Samanhudi)                                   204,006,365    188,284,600     20,711,306      4,989,541       204,006,365
                                                                  BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                                  100% Paket Pekerjaan FO Network Optimization
108      19-Oct-23        MANDIRI IDR          1220011559559      12.291m                                                 1,605,579,889   1,469,638,343   161,660,217     25,718,671     1,605,579,889

                                                                  AREA BADUNG , Akuisisi site 751200 Kerobokan
                                                                  Kelod_025 seluas lahan 1 m2, jangka waktu 10
                                                                  tahun periode 2023-2033(PO Rp.111.111.111,-
109      19-Oct-23        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 10% Rp.11.111.111,-                     100,000,000    111,111,111            -       11,111,111       100,000,000
                                                                  AREA BADUNG , Akuisisi site 211246 Ungasan
                                                                  009 seluas lahan 9 m2, jangka waktu 10 tahun
                                                                  periode 2023-2033(PO Rp.155.555.555,-
110      19-Oct-23        MANDIRI IDR          1220011559559      Potongan PPh Rp.15.555.555,-)                             140,000,000    155,555,555            -       15,555,555       140,000,000
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
111      20-Oct-23        MANDIRI IDR          1220011559559      16.577m                                                 2,142,798,238   1,961,371,385   215,750,852     34,323,999     2,142,798,238
                                                                  EDI SLAMET , Pekerjaan Collocation XL Site
                                                                  JBN_07 Dah Waru (PO Rp.2.673.954,- Potongan
112      23-Oct-23        SINARMAS IDR          0002999994        PPh 21(2.5%) Rp.66.849,-)                                   2,607,105      2,673,954            -           66,849         2,607,105
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Paket
                                                                  Pekerjaan Relokasi Perangkat XL (Elevasi 19m ke
                                                                  29m) Site M_85 Buduk Utara (PO Rp.6.549.000,-
                                                                  PPN Rp.649.000,- Potongan PPh 4(2) 1.75%
113      23-Oct-23        SINARMAS IDR          0002999994        Rp.103.250,-)                                               6,445,750      5,900,000       649,000         103,250         6,445,750
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Tuban_010 dan Biaya Admin
114      23-Oct-23        SINARMAS IDR          0002999994        Rp.5.000,-                                                  7,976,300      7,976,300            -               -          7,976,300
                                                                  PLN PERSERO, PT , Token Pulsa Listrik Site Tuban
115      23-Oct-23        SINARMAS IDR          0002999994        _010 dan Biaya Admin Rp.2.500,-                             1,002,500      1,002,500            -               -          1,002,500
Page 71
                                                                                               Page 8
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK     DPP           PPN             PPh         NET DIBAYARKAN
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Tumbak Bayuh-003 dan Biaya
116      23-Oct-23        SINARMAS IDR          0002999994        Admin Rp.5.000,-                                             7,976,300     7,976,300           -               -          7,976,300

                                                                  PLN PERSERO, PT , Token Pulsa Listrik Site
117      23-Oct-23        SINARMAS IDR          0002999994        Tumbak Bayuh-003 dan Biaya Admin Rp.2.500,-                  1,002,500     1,002,500           -               -          1,002,500

                                                                  AREA BADUNG , Pengajuan Pembayaran (Kedua)
                                                                  Bulan Oktober 2023 Sewa lahan Site 499513
                                                                  Combat Tibubeneng_002 (PO Rp.20.000.000,-
118      23-Oct-23        SINARMAS IDR          0002999994        Potongan PPh 4(2) 10% Rp.500.000,- )                         4,500,000     5,000,000           -          500,000         4,500,000
                                                                  BIBIT, Mr , Biaya Pekerjaan Relokasi Pole P7_09
                                                                  FO Link Site_14 to Site_48 Jln. Raya Canggu
                                                                  Pererenan Badung (PO Rp.1.044.636,- Potongan
119      23-Oct-23        SINARMAS IDR          0002999994        PPh 21(9%) Rp.94.017,- )                                      950,619      1,044,636           -           94,017          950,619
                                                                  BIBIT, Mr , Biaya biaya pekerjaan dismantle tiang
                                                                  FO impact pekerjaan PU FO link M39 Pantai
                                                                  Berawa(PO Rp.779.837,- Potongan PPh 21(9%)
120      23-Oct-23        SINARMAS IDR          0002999994        Rp.70.185,- )                                                 709,652       779,837            -           70,185          709,652
                                                                  SYMMETRY CONTRACTING INDONESIA, PT ,
                                                                  Tagihan 100% atas Pekerjaan Penarikan Kabel FO
                                                                  Final as Build Jakarta Selatan - Akses Site
121      24-Oct-23        MANDIRI IDR          1220011559559      Kebayoran Lama Utara-004                                    11,087,456    10,233,000     1,125,630        271,174        11,087,456

                                                                  ALIANSI INOVASI GLOBAL, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
122      24-Oct-23        MANDIRI IDR          1220011559559      Jakarta Utara - Akses Site - Sunter Agung-037               10,191,277     9,328,400     1,026,124        163,247        10,191,277
                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Tagihan
                                                                  100% atas Pekerjaan Instalasi Tiang & ME
                                                                  Grounding & Accessories Pole Octagonal Steel
123      24-Oct-23        MANDIRI IDR          1220011559559      21 M Site Jimbaran-014                                      33,568,860    30,981,873     3,408,006        821,019        33,568,860

                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Tagihan
                                                                  100% atas Paket Pekerjaan Civil Work Tiang Pole
124      24-Oct-23        MANDIRI IDR          1220011559559      Octagonal Steel 21 M Site Jimbaran-014                      29,056,153    26,816,938     2,949,863        710,648        29,056,153

                                                                  YUYUN MUNADHI , Tagihan 100% atas Pekerjaan
125      24-Oct-23        MANDIRI IDR          1220011559559      Pemindahan Tiang FO Jalur site Jayengan-001                  1,082,354     1,110,106           -           27,752         1,082,354
                                                                  PUTRA NEGARA, PT , Tagihan DP 30% atas Biaya
                                                                  Paket Pekerjaan Perbaikan RAK Kabinet (RK) 7
126      24-Oct-23        MANDIRI IDR          1220011559559      Ways Surabaya - PPN                                          1,414,215           -       1,414,215             -          1,414,215
                                                                  PUTRA NEGARA, PT , Tagihan DP 30% atas Biaya
                                                                  Paket Pekerjaan Perbaikan RAK Kabinet (RK) 7
127      24-Oct-23        MANDIRI IDR          1220011559559      Ways Surabaya                                               12,856,500    12,856,500           -               -         12,856,500
                                                                  PUTRA NEGARA, PT , Tagihan DP 30% atas Biaya
                                                                  Paket Pekerjaan Perbaikan RAK Kabinet (RK) 7
128      24-Oct-23        MANDIRI IDR          1220011559559      Ways Surabaya - PPh                                           (340,697)          -             -          340,697          (340,697)
                                                                  PENTAWIRA CIPTA LARAS INDONESIA, PT ,
                                                                  Tagihan 100% atas Pekerjaan Penarikan Kabel FO
                                                                  Relokasi Temporary Jl.Lapangan Banteng Timur
129      24-Oct-23        MANDIRI IDR          1220011559559      Site MP-Pasar Baru-001                                      17,490,599    16,142,685     1,775,695        427,781        17,490,599
                                                                  AREA BADUNG , Biaya sewa lahan site 499512
                                                                  combat Tibubeneng-001 selama 1 Bulan periode
                                                                  28 Oktober-27 November 2023(PO
                                                                  Rp.20.000.000,- Potongan PPh 4(2) 10%
130      26-Oct-23        SINARMAS IDR          0002999994        Rp.500.000,-)                                                4,500,000     4,500,000           -               -          4,500,000
Page 72
                                                                                                Page 9
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                            NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN

                                                                  BIBIT, Mr , Biaya Pekerjaan Perbaikan FO Cut Link
                                                                  Site_43 to Site_49 (TT.I0921- 002) - Jln. Raya
                                                                  Dalung - Kwanji,Badung (PO Rp.2.230.500,-
131      26-Oct-23        SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.200.745,- )                            2,029,755      2,230,500            -          200,745         2,029,755

                                                                  BIBIT, Mr , Biaya Pekerjaan Perbaikan FO Cut Link
                                                                  Site_16 to Site_07 (TT.I0924- 001) - Jl. Pura Batu
                                                                  Pageh, Ungasan,Badung (PO Rp.1.967.750,-
132      26-Oct-23        SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.177.098,-)                             1,790,652      1,967,750            -          177,098         1,790,652

                                                                  BIBIT, Mr , Biaya Pekerjaan Perbaikan FO Cut Link
                                                                  BLL_08 to BLL_16 (TT.I0928- 003) - Jln. Raya
                                                                  Gitgit Pegayaman,Buleleng (PO Rp.3.239.850,-
133      26-Oct-23        SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.291.587,-                              2,948,263      3,239,850            -          291,587         2,948,263
                                                                  ZTE INDONESIA, PT , DP 10% atas Pengadaan
                                                                  Battery Lithium 48V 100AH ZXDC48 FB100B3 ZTE
134      27-Oct-23        MANDIRI IDR          1220011559559      Batch 4 sebanyak 1.000 Unit - PPN                           197,013,960             -     197,013,960             -        197,013,960
                                                                  ZTE INDONESIA, PT , DP 10% atas Pengadaan
                                                                  Battery Lithium 48V 100AH ZXDC48 FB100B3 ZTE
135      27-Oct-23        MANDIRI IDR          1220011559559      Batch 4 sebanyak 1.000 Unit                               1,791,036,000   1,791,036,000           -               -      1,791,036,000
                                                                  PRYSMIAN CABLES INDONESIA, PT , Uang Muka
                                                                  Beban Umum atas Pengajuan Giro Mundur
                                                                  untuk pengadaan material kabel ADSS 48,32,96
136      31-Oct-23        MANDIRI IDR          1220011559559      core - PO : 1010034327 - Trf                              1,959,474,120   1,765,292,000   194,182,120             -      1,959,474,120

                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  Paket Pekerjaan Delivery dan Erection MBTS
                                                                  Type Moto 23M Site 499505 Combat Kerobokan
                                                                  Kaja-001(PO Rp.7.326.000,- PPN Rp.726.000,-
137      1-Nov-23         MANDIRI IDR          1220011559559      Potongan PPh 4(2) 2.65% Rp.174.900,-                          7,151,100      6,600,000       726,000         174,900         7,151,100
                                                                  AREA BADUNG , Akuisisi Perpanjangan untuk
                                                                  sewa lahan site 40 BTDC Nusa Dua seluas 300
                                                                  m2, jangka waktu 10 tahun Periode 2027-2037
                                                                  (PO Rp.666.666.666,-Potongan PPh 4(2) 10%
138      1-Nov-23         MANDIRI IDR          1220011559559      Rp.66.666.666,- )                                           600,000,000    600,000,000            -               -        600,000,000
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Additional 2 ME Grounding
                                                                  & Accessories Monopole Octagonal Ciketingudik-
139      1-Nov-23         MANDIRI IDR          1220011559559      001                                                           2,306,990      2,111,661       232,283          36,954         2,306,990
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Additional ME Grounding &
                                                                  Accessories Telemmatika 14/900 Site MP-
140      1-Nov-23         MANDIRI IDR          1220011559559      Kalideres-001                                                 2,586,128      2,367,165       260,388          41,425         2,586,128

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Pole
141      1-Nov-23         MANDIRI IDR          1220011559559      Octagonal Steel 21 M Site Penjaringan-004                    27,551,332     25,218,610      2,774,047        441,325        27,551,332

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
142      1-Nov-23         MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Cimuning-001                  27,188,076     24,886,110      2,737,472        435,506        27,188,076

                                                                  HANDASA KONSULTAN, PT , Pelunasan Sebesar
                                                                  20% Kebutuhan Biaya Jasa Pengurusan Sertifikat
                                                                  Laik Fungsi (SLF) Untuk Site M_215 Tuan Langga
                                                                  dan Site M_55 Gulingan (PO Rp.256.410.000,-
                                                                  PPN Rp.484.000,- Potongan PPh 4(2) 3.5%
143      3-Nov-23         SINARMAS IDR          0002999994        Rp.154.000,- )                                                4,730,000      4,400,000       484,000         154,000         4,730,000
Page 73
                                                                                               Page 10
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  I KETUT DARTA , "Pegurusan Dokumen NIDI dan
                                                                  SLO Daya 16.500 VA Site 751180 Kerobokan
                                                                  Kelod-024(PO Rp.1.905.000,- Potongan PPh
144      3-Nov-23         SINARMAS IDR          0002999994        21(2.5%) Rp.47.625,- )                                       1,857,375     1,905,000           -           47,625         1,857,375
                                                                  I KETUT DARTA , Pegurusan Dokumen NIDI dan
                                                                  SLO Daya 7.700 VA Site 751213 Tuban-010 (PO
                                                                  Rp.690.000,- Potongan PPh 21(2.5%) Rp.17.250,-
145      3-Nov-23         SINARMAS IDR          0002999994        )                                                             672,750       690,000            -           17,250          672,750
                                                                  I KETUT DARTA , "Pegurusan Dokumen NIDI dan
                                                                  SLO Daya 7.700 VA Site 751168 Tumbak Bayuh-
                                                                  003(PO Rp.690.000,- Potongan PPh 21(2.5%)
146      3-Nov-23         SINARMAS IDR          0002999994        Rp.17.250,- )                                                 672,750       690,000            -           17,250          672,750
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Ungasan _009 dan Biaya Admin
147      3-Nov-23         SINARMAS IDR          0002999994        Rp.5.000,-                                                   7,976,300     7,976,300           -               -          7,976,300
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Kerobokan Kelod 25 dan Biaya
148      3-Nov-23         SINARMAS IDR          0002999994        Admin Rp.5.000,-                                             7,976,300     7,976,300           -               -          7,976,300
                                                                  PLN PERSERO, PT , 'Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Jimbaran_029 dan Biaya Admin
149      3-Nov-23         SINARMAS IDR          0002999994        Rp.5.000,-                                                   7,976,300     7,976,300           -               -          7,976,300
                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding Site 211242 Sibang
                                                                  Kaja_004(PO Rp.17.809.275,- Potongan PPh
150      3-Nov-23         SINARMAS IDR          0002999994        21(3%) Rp.309.275,-)                                        17,500,000    17,809,275           -          309,275        17,500,000

                                                                  BIBIT , Biaya Pekerjaan Perbaikan FO Cut (TT.
                                                                  I1003-005) Restorasi FO Link Site_49 to Site_43 -
                                                                  Impact Galian PUPR Kwanji(PO Rp.1.528.220,-
151      3-Nov-23         SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.137.540,-)                            1,390,680     1,528,220           -          137,540         1,390,680

                                                                  COMMUNICATION CABLE SYSTEMS INDONESIA,
                                                                  PT , Uang Muka Beban Umum atas Pembayaran
                                                                  Giro Mundur untuk pelunasan pengadaan kabel
152      3-Nov-23         MANDIRI IDR          1220011559559      ADSS - PO : 1010035712 - Trf                               824,654,520   824,654,520           -               -        824,654,520
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 27U V3.0 2 Door 2Pcs, ODC 27U
                                                                  V2.1 1 Door 2Pcs, ODC 27U&15U Bracket 4Pcs,
                                                                  ODC 27U&15U Bracket Longdrat 16Pcs, ODC 27U
153      3-Nov-23         MANDIRI IDR          1220011559559      Electrical 2Pcs                                             67,472,460    60,786,000     6,686,460             -         67,472,460
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U Rack 19" dan Modular
                                                                  ACPDB DCPDB 3Phase masing-masing sebanyak
154      3-Nov-23         MANDIRI IDR          1220011559559      3 Unit                                                     131,202,000   118,200,000    13,002,000             -        131,202,000
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan Modular ACPDB-DCPDB 3 Phase
155      3-Nov-23         MANDIRI IDR          1220011559559      sebanyak 1 Unit                                             10,933,500     9,850,000     1,083,500             -         10,933,500
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U Rack 19Inch dan Modular
                                                                  ACPDB DCPDB 3 Phase masing-masing sebanyak
156      3-Nov-23         MANDIRI IDR          1220011559559      2 Unit                                                      87,468,000    78,800,000     8,668,000             -         87,468,000
                                                                  HUME SAKTI INDONESIA, PT , DP 45% atas
                                                                  Pengadaan Concrete Pole Fabrication Type 14M -
157      3-Nov-23         MANDIRI IDR          1220011559559      900 daN sebanyak 100 Batang                                200,000,000   200,000,000           -               -        200,000,000
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Biaya
                                                                  Perbaikan Akses Jalan Site 94 Yeh Gangga(PO
                                                                  Rp.6.749.760,- PPN Rp.668.893,- Potongan PPh
158      7-Nov-23         MANDIRI IDR          1220011559559      4(2) 1.75% Rp.106.415,-)                                     6,643,325     6,080,847      668,893         106,415         6,643,325
Page 74
                                                                                              Page 11
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Biaya
                                                                  Perbaikan Akses Jalan Site 95 Pangkung Karung
                                                                  (PO Rp.15.425.014,- PPN Rp.1.528.604,-
159      7-Nov-23         MANDIRI IDR          1220011559559      Potongan PPh 4(2) 1.75% Rp.243.187,- )                     15,181,826    13,896,409     1,528,604        243,187        15,181,826
                                                                  MONETI INDO TEKNO, PT , Pembelian Cable
                                                                  Power NYFBGY 4x16MM Kabelindo Sebanyak
                                                                  1.000m, Cage Nut - Screw D 6MM L20MM
160      7-Nov-23         MANDIRI IDR          1220011559559      Sebanyak 2.000 Pcs                                        177,267,000   159,700,000    17,567,000             -        177,267,000
                                                                  AREA BADUNG , Akuisisi site 211242
                                                                  Sibangkaja_004 seluas lahan 9 m2, jangka waktu
                                                                  10 tahun periode 2023-2033(PO
                                                                  Rp.155.555.555,-Potongan PPh 4(2) 10%
161      8-Nov-23         MANDIRI IDR          1220011559559      Rp.15.555.555,-)                                          140,000,000   140,000,000           -               -        140,000,000

                                                                  NATA JAYA ELEKTRO, PT , Penagihan 10% untuk
                                                                  biaya pekerjaan pemindahaan perangkat tenant
                                                                  DPS 03 batanta to Dauh Puri Kelod-010 (PO
                                                                  Rp.75.881.238,- PPN Rp.751.976,- Potongan PPh
162      9-Nov-23         MANDIRI IDR          1220011559559      4(2) 1.75% Rp.119.633,-                                     7,468,491     6,836,148      751,976         119,633         7,468,491
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan MCP Pole 21M sebanyak 10 Unit
163      9-Nov-23         MANDIRI IDR          1220011559559      ( XL Project) - PPN                                        83,298,424           -      83,298,424             -         83,298,424
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
                                                                  MCP Pole 21M sebanyak 15 Unit (Project Bali) -
164      9-Nov-23         MANDIRI IDR          1220011559559      PPN                                                        55,382,317           -      55,382,317             -         55,382,317
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Anchor sebanyak 320Pcs dan
165      9-Nov-23         MANDIRI IDR          1220011559559      Plate Setting sebanyak 40Pcs - PPN                          5,704,497           -       5,704,497             -          5,704,497
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
                                                                  Operasi (SLO) Site Ulujami-022,Senayan-
166      9-Nov-23         MANDIRI IDR          1220011559559      018,Tegal Alur-008                                          2,625,990     2,409,165      265,008          48,183         2,625,990

                                                                  ALIANSI INOVASI GLOBAL, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
167      9-Nov-23         MANDIRI IDR          1220011559559      Jakarta Utara - Akses Site - Penjaringan-004               10,620,062     9,720,880     1,069,297        170,115        10,620,062
                                                                  WHIDIA BHARAYA, PT , Jasa Soil Test site Kuta-
168      9-Nov-23         MANDIRI IDR          1220011559559      025                                                         3,762,500     3,500,000      385,000         122,500         3,762,500
                                                                  WHIDIA BHARAYA, PT , Jasa Analisa Pondasi site
169      9-Nov-23         MANDIRI IDR          1220011559559      Buduk-001                                                   1,612,500     1,500,000      165,000          52,500         1,612,500
                                                                  WHIDIA BHARAYA, PT , Jasa Soil Test site Pecatu
170      9-Nov-23         MANDIRI IDR          1220011559559      Kangin                                                      3,762,500     3,500,000      385,000         122,500         3,762,500
                                                                  WHIDIA BHARAYA, PT , Jasa Soil Test site Benoa-
171      9-Nov-23         MANDIRI IDR          1220011559559      017                                                         3,762,500     3,500,000      385,000         122,500         3,762,500
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Sibang Kaja_004 dan Biaya Admin
172      14-Nov-23        SINARMAS IDR          0002999994        Rp.5.000,-                                                  7,976,300     7,976,300           -               -          7,976,300

                                                                  IMAM TAUFIK , Biaya Pekerjaan Perbaikan FO
                                                                  Cut (TT.I1005-008) Relokasi FO Site_02 to
                                                                  Site_41 Comecase P7_55 dan P7_43 - Jln. Bukit
                                                                  Hijau, Jimbaran - Badung(PO Rp.3.385.800,-
173      14-Nov-23        SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.101.574,- )                          3,284,226     3,385,800           -          101,574         3,284,226
                                                                  BIBIT , Biaya Pekerjaan Clamp HDPE di dinding
                                                                  saluran drainase FO aksess GNY_14 Jl. Sakura
                                                                  Serongga, Gianyar(PO Rp.2.014.947,- Potongan
174      14-Nov-23        SINARMAS IDR          0002999994        PPh 21(9%) Rp.181.345,- )                                   1,833,602     2,014,947           -          181,345         1,833,602
Page 75
                                                                                               Page 12
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                           NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  BIBIT , Biaya Pekerjaan Verticality P7_114 FO BSC
                                                                  G. Islam to Site_05 & P7_74 FO BPJN_2 Site_05
                                                                  to MCP 750035 Jln. Pulau Galang dan Jln.
                                                                  Mertasari Denpasar Selatan (PO Rp. 898.947,-
175      14-Nov-23        SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.80.905,- )                             818,042         898,947            -           80,905          818,042

                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Strengthening MP 30M
176      15-Nov-23        MANDIRI IDR          1220011559559      3 System site M85 Buduk Utara sebanyak 1 Set               116,796,341    105,221,929     11,574,412             -        116,796,341
                                                                  NATA JAYA ELEKTRO, PT , Biaya Peket Pekerjaan
                                                                  Civil Work Tiang Pole Octagonal Stell 21m Site
                                                                  751162 Kerobokan Kelod_020 (PO
                                                                  Rp.25.967.049,- PPN Rp.2.573.311,- Potongan
177      15-Nov-23        MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.409.390,-                                 25,557,659     23,393,738      2,573,311        409,390        25,557,659
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Instalasi Tiang & ME
                                                                  Grounding & Accessories Pole Octagonal 21 M
178      15-Nov-23        MANDIRI IDR          1220011559559      Penjaringan-004                                             34,070,913     31,186,190      3,430,481        545,758        34,070,913

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
179      15-Nov-23        MANDIRI IDR          1220011559559      Baja Octagonal Steel 26 M Site Suka Damai-006               49,656,070     45,451,780      4,999,696        795,406        49,656,070

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Pole
180      15-Nov-23        MANDIRI IDR          1220011559559      Octagonal Steel 21 M Site Cengkareng Timur-007              27,551,332     25,218,610      2,774,047        441,325        27,551,332
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Instalasi Tiang & ME
                                                                  Grounding & Accessories Pole Octagonal 21 M
181      15-Nov-23        MANDIRI IDR          1220011559559      Site Cengkareng Timur-007                                   33,917,697     31,045,947      3,415,054        543,304        33,917,697

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
182      15-Nov-23        MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Tegal Alur-025               27,551,332     25,218,610      2,774,047        441,325        27,551,332
                                                                  CIPTABUANA TRANS ABADI, PT, Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
183      15-Nov-23        MANDIRI IDR          1220011559559      15.804m                                                  2,066,232,495   1,891,288,324   208,041,716     33,097,545     2,066,232,495
                                                                  BERANI INOVASI INDONESIA, PT , Tagihan 100%
                                                                  atas Relokasi 1 Pekerjaan Instalasi Tiang & ME
                                                                  Grounding & Accessories Pole Octagonal 21M
184      16-Nov-23        MANDIRI IDR          1220011559559      Site Ancol-038                                              32,483,323     33,367,563            -          884,240        32,483,323
                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  Paket Pekerjaan Civil Work Tiang Pole Octagonal
                                                                  Steell 26m Site 751160 Dalung_003 (PO
                                                                  Rp.57.277.873,- PPN Rp.5.676.186,- Potongan
185      17-Nov-23        MANDIRI IDR          1220011559559      PPh 4(2) 2.65% Rp.1.367.445,-                               55,910,428     51,601,687      5,676,186      1,367,445        55,910,428
                                                                  AREA BADUNG , Akuisisi Perpanjangan untuk
                                                                  sewa lahan Site_13 Pecatu seluas 300 m2, jangka
                                                                  waktu 10 tahun Periode 11 Oktober 2027-11
                                                                  Oktober 2037 (PO Rp.600.000.000,- Potongan
186      17-Nov-23        MANDIRI IDR          1220011559559      PPh 4(2) 10% Rp.60.000.000,-)                              540,000,000    540,000,000            -               -        540,000,000
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan Modular ACPDB-DCPDB 3 Phase
187      17-Nov-23        MANDIRI IDR          1220011559559      sebanyak 10 Unit                                           109,335,000     98,500,000     10,835,000             -        109,335,000
Page 76
                                                                                             Page 13
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 27U V3.0 2 Door 8Pcs, ODC 27U
                                                                  V2.1 1 Door 8Pcs, ODC 27U&15UBracket 16Pcs,
                                                                  ODC 27U&15U Bracket Longdrat 64Pcs, ODC 27U
188      17-Nov-23        MANDIRI IDR          1220011559559      Electrical 8Pcs                                          269,889,840    243,144,000     26,745,840             -        269,889,840
                                                                  CIPTABUANA TRANS ABADI, PT, Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
189      17-Nov-23        MANDIRI IDR          1220011559559      17,842m                                                2,300,139,947   2,105,391,255   231,593,038     36,844,346     2,300,139,947
                                                                  EDI SLAMET , Biaya Pekerjaan Collocation XL
                                                                  (Penambahan Grounding) Site 499507 Combat
                                                                  Pecatu-001 (PO Rp.1.184.352,- Potongan PPh
190      21-Nov-23        SINARMAS IDR          0002999994        21(2.5%) Rp.29.609,- )                                     1,154,743      1,184,352            -           29,609         1,154,743
                                                                  EDI SLAMET , Biaya Pekerjaan Collocation TSel
                                                                  Site M_190 Bersiih (PO Rp.2.125.500,- Potongan
191      21-Nov-23        SINARMAS IDR          0002999994        PPh 21(2.5%) Rp.53.138,- )                                 2,072,362      2,125,500            -           53,138         2,072,362
                                                                  EDI SLAMET , Biaya Pekerjaan Collocation XL
                                                                  (Penggantian Mounting) Site M_206 Sanggar
                                                                  Buana (PO Rp.1.860.680,- Potongan PPh
192      21-Nov-23        SINARMAS IDR          0002999994        21(2.5%) Rp.46.517,- )                                     1,814,163      1,860,680            -           46,517         1,814,163
                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan kontribusi Site
                                                                  751190 Abiansemal-001 (PO Rp.44.237.113,-
193      21-Nov-23        SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.1.237.113,-)                       43,000,000     43,000,000            -               -         43,000,000
                                                                  AREA BADUNG , Biaya Sewa lahan Site 499513
                                                                  Combat Tibubeneng_002 (Ketiga) selama 1
                                                                  Bulan Periode 22 November 2023-21 Desember
                                                                  2023 (PO Rp.20.000.000,- Potongan PPh 4(2)
194      21-Nov-23        SINARMAS IDR          0002999994        10% Rp.500.000,- )                                         4,500,000      5,000,000            -          500,000         4,500,000

                                                                  PUTERATEL ANDALAN SUKSES, PT , Pembelian
195      21-Nov-23        MANDIRI IDR          1220011559559      OTB Indoor 1U 24 Core SC/UPC Sebanyak 20 Unit             13,653,000     12,300,000      1,353,000             -         13,653,000
                                                                  DUTA CIPTA SARANA, PT , Tagihan 100% atas
                                                                  Pekerjaan Civil Work Tiang Baja Monopole
196      21-Nov-23        MANDIRI IDR          1220011559559      Octagonal 26 M Site Baha-001                              72,838,521     66,671,415      7,333,855      1,166,749        72,838,521
                                                                  SARWA UTAMA NUSA, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi AP Seamless site Skywalk
197      21-Nov-23        MANDIRI IDR          1220011559559      Cihampelas                                                22,573,257     23,033,935            -          460,678        22,573,257
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Dismantle FO Aerial ex Relokasi Jl.
                                                                  Pahlawan Revolusi Jakarta Timur Site MP-Duren
198      21-Nov-23        MANDIRI IDR          1220011559559      Sawit-002                                                  2,733,918      2,955,587            -          221,669         2,733,918
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Site Sukaasih Kab.Tangerang-
199      21-Nov-23        MANDIRI IDR          1220011559559      004                                                        1,671,427      1,806,948            -          135,521         1,671,427
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Impact Tertabrak Truck site MP
200      21-Nov-23        MANDIRI IDR          1220011559559      Lebak Bulus-001                                            1,768,366      1,911,747            -          143,381         1,768,366
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Pemindahan Tiang dan FAT-01-004
                                                                  Cluster Cengkareng Timur RW09 site Cengkareng
201      21-Nov-23        MANDIRI IDR          1220011559559      Timur-029                                                  1,563,585      1,737,748            -          174,163         1,563,585
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Progress Relokasi FAT 197 Permata
202      21-Nov-23        MANDIRI IDR          1220011559559      Buana RW11                                                  975,272       1,054,348            -           79,076          975,272
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Impact Progress Pekerjaan
                                                                  Pembongkaran Jembatan site MP Pegangsaan
203      21-Nov-23        MANDIRI IDR          1220011559559      Dua-001                                                    1,679,567      1,815,748            -          136,181         1,679,567
Page 77
                                                                                             Page 14
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Relokasi Jalur KU ke Underground
204      21-Nov-23        MANDIRI IDR          1220011559559      Impact Perapihan site Pondok Bambu-018                     2,147,986     2,322,147           -          174,161         2,147,986
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Impact Kebakaran site Cinere-
205      21-Nov-23        MANDIRI IDR          1220011559559      014                                                        1,571,526     1,698,947           -          127,421         1,571,526
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Impact Kabel Cut di Gorong-
206      21-Nov-23        MANDIRI IDR          1220011559559      gorong site MP Duri Kepa-001                               1,765,777     1,908,948           -          143,171         1,765,777
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Impact Kabel Tertabrak Truck
207      21-Nov-23        MANDIRI IDR          1220011559559      site MP Lubang Buaya-001                                   2,424,747     2,621,348           -          196,601         2,424,747
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Reroute Kabel Distribusi di Cluster
208      21-Nov-23        MANDIRI IDR          1220011559559      Meruyung RW06 site MP Meruyung-001                         1,123,086     1,214,147           -           91,061         1,123,086
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact Kabel
                                                                  Terbakar Kabel PLN site Diskominfo AP RW04,
209      21-Nov-23        MANDIRI IDR          1220011559559      Kampung Melayu, Jatinegara, Jak-tim                        1,732,846     1,873,347           -          140,501         1,732,846
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Pencabutan Tiang Impact Relokasi
                                                                  Kabel site Diskominfo AP RW04, Pekayon, Pasar
210      21-Nov-23        MANDIRI IDR          1220011559559      Rebo, Jak-Tim                                              1,268,126     1,370,947           -          102,821         1,268,126
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact
                                                                  Pemindahan Tiang Permintaan Warga site
                                                                  Diskominfo AP RW05, Bale Kambang, Kramat
211      21-Nov-23        MANDIRI IDR          1220011559559      Jati, Jak-Tim                                              2,249,366     2,431,747           -          182,381         2,249,366
                                                                  BERGAS PAMUNGKAS , Tagihan 100% atas
                                                                  Pekerjaan Pemindahan Tiang Impact
                                                                  Pembangunan Rumah dan permintaan Warga
                                                                  site Diskominfo AP RW01, Grogol Selatan,
212      21-Nov-23        MANDIRI IDR          1220011559559      Kebayoran Lama, Jaksel                                     1,628,442     1,760,477           -          132,035         1,628,442
                                                                  REKATAMA SOLUSINDO, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Timur - Akses Site - Relokasi Jalan
213      21-Nov-23        MANDIRI IDR          1220011559559      Lapangan Tembak Cibubur                                   75,095,610    68,737,400     7,561,114      1,202,904        75,095,610
                                                                  GIGA DATACOM, PT , Tagihan Retensi 10% atas
                                                                  Pekerjaan Activation For New Services Corporate
                                                                  Delivery - PT Graha Bali Samudera (White Rock
214      22-Nov-23        MANDIRI IDR          1220011559559      Beach Club)                                                1,329,272     1,242,310      136,654          49,692         1,329,272
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Pekerjaan Dismantle Tiang Beton
215      22-Nov-23        MANDIRI IDR          1220011559559      Telematika 14/900 Site Warakas-007                        14,202,500    13,000,000     1,430,000        227,500        14,202,500

                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Pekerjaan Dismantle Tiang Beton
216      22-Nov-23        MANDIRI IDR          1220011559559      Telematika 14/900 Site Tanjung Duren Utara-008            14,202,500    13,000,000     1,430,000        227,500        14,202,500

                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
217      22-Nov-23        MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Kamal Muara-035            27,188,076    24,886,110     2,737,472        435,506        27,188,076

                                                                  DIAN MUSTIKA AGUNG, PT , Pembelian PJU
218      22-Nov-23        MANDIRI IDR          1220011559559      Lamp 60 Watt Ledenvo Osram Sebanyak 100 Pcs              169,275,000   152,500,000    16,775,000             -        169,275,000

                                                                  GIGA DATACOM, PT , Tagihan Retensi 10% atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build
219      22-Nov-23        MANDIRI IDR          1220011559559      Jakarta Barat - Akses Site - Pegadungan RW09               1,976,589     1,847,280      203,200          73,891         1,976,589
Page 78
                                                                                              Page 15
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK     DPP            PPN             PPh         NET DIBAYARKAN
                                                                  AREA BADUNG , Akuisisi site 751190
                                                                  Abiansemal_001 seluas 4m2, jangka waktu 10
                                                                  tahun periode 2023-2033(PO Rp.183.333.333,-
220      23-Nov-23        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 10% Rp.18.333.333,-                     165,000,000    165,000,000           -               -        165,000,000
                                                                  TELCO ABADI JAYA, PT , Pembelian Cable Power
                                                                  NYAF 10MM Red Sebanyak 1.000 MTR, Cable
221      23-Nov-23          BCA IDR             3193058058        Power NYAF 10MM Black 1.000 MTR                            51,393,000     46,300,000     5,093,000             -         51,393,000
                                                                  TELCO ABADI JAYA, PT , Pembelian Hand Tools
222      23-Nov-23          BCA IDR             3193058058        Ladder Telescopic 4.4M Sebanyak 1 Unit                      1,132,200      1,020,000      112,200              -          1,132,200
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
223      24-Nov-23        MANDIRI IDR          1220011559559      MP 30M Light Batch 2 sebanyak 3 Set                       131,590,620    131,590,620           -               -        131,590,620
                                                                  PLN PERSERO, PT , Pengisian Pulsa Listrik Site
224      27-Nov-23        SINARMAS IDR          0002999994        Ungasan-009 dan Biaya Admin Rp.2.500,-                      1,002,500      1,002,500           -               -          1,002,500

                                                                  AREA BADUNG , Biaya sewa lahan site 499512
                                                                  combat Tibubeneng-001 (Keempat) selama 1
225      27-Nov-23        SINARMAS IDR          0002999994        Bulan periode 28 November-27 Desember 2023                  4,500,000      5,000,000           -          500,000         4,500,000
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Tuban_010 dan Biaya Admin
226      27-Nov-23        SINARMAS IDR          0002999994        Rp.5.000,                                                  11,790,192     11,790,192           -               -         11,790,192
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Dalung_007 dan Biaya Admin
227      27-Nov-23        SINARMAS IDR          0002999994        Rp.5.000,-                                                 11,264,700     11,264,700           -               -         11,264,700
                                                                  PLN PERSERO, PT , Token Pulsa Listrik Site
228      27-Nov-23        SINARMAS IDR          0002999994        Jimbaran_029 dan Biaya Admin Rp.2.500,-                     1,002,500      1,002,500           -               -          1,002,500
                                                                  BIBIT , Biaya Dismantle Pole FO Link M_86 to
                                                                  M_75 Impact merger tiang FO di wilayah
                                                                  Kelurahan Sading(PO 1.334.574,- Potongan PPh
229      27-Nov-23        SINARMAS IDR          0002999994        21(9%) Rp.120.112,- )                                       1,214,462      1,334,574           -          120,112         1,214,462
                                                                  ALPHA CIPTA COMPUTINDO, PT , Pembelian
230      1-Dec-23           BCA IDR             3193058058        Tools Ladder Telescopic 7M Sebanyak 3 Unit                  9,307,350      8,385,000      922,350              -          9,307,350

                                                                  ALPHA CIPTA COMPUTINDO, PT , Pembelian APC
                                                                  BX1600MIMS Back-UPS 230V AVR Sebanyak 1
                                                                  unit, Switch TL-SG1016DE TP-Link 1 Unit,
231      1-Dec-23           BCA IDR             3193058058        Logitech MK 215 Wireless Keyboard Mouse 1 Set               4,900,650      4,415,000      485,650              -          4,900,650
                                                                  JOHNSON COM INDONESIA, PT , Tagihan 90%
                                                                  atas Pekerjaan Penarikan Kabel FO - Link Site_32
232      1-Dec-23         MANDIRI IDR          1220011559559      Abiansemal to Site_35 Sangeh                              336,862,608    314,824,867    34,630,735     12,592,994       336,862,608

                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Strengthening MP 30M
                                                                  3 System site Gajah Sura, Pecatu Kangin & Raya
233      1-Dec-23         MANDIRI IDR          1220011559559      Sading masing - masing sebanyak 1 Set                     327,689,209    295,215,504    32,473,705             -        327,689,209
                                                                  HANDASA KONSULTAN, PT , Potongan PPh 4(2)
                                                                  3.5% Termin (1) DP 40% Kebutuhan Biaya Jasa
                                                                  Pengurusan Sertifikat Laik Fungsi (SLF) 6 Site
                                                                  MCP Badung (PO Rp.79.920.000,-PPN
                                                                  Rp.3.168.000,- Potongan PPh 4(2) 3.5%
234      1-Dec-23         MANDIRI IDR          1220011559559      Rp.1.008.000,- )                                           (1,008,000)           -             -        1,008,000        (1,008,000)
                                                                  HANDASA KONSULTAN, PT , Termin (1) DP 40%
                                                                  Kebutuhan Biaya Jasa Pengurusan Sertifikat Laik
                                                                  Fungsi (SLF) 6 Site MCP Badung (PO
                                                                  Rp.79.920.000,-PPN Rp.3.168.000,- Potongan
235      1-Dec-23         MANDIRI IDR          1220011559559      PPh 4(2) 3.5% Rp.1.008.000,- )                             28,800,000     28,800,000           -               -         28,800,000
Page 79
                                                                                               Page 16
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  HANDASA KONSULTAN, PT , PPN Termin (1) DP
                                                                  40% Kebutuhan Biaya Jasa Pengurusan Sertifikat
                                                                  Laik Fungsi (SLF) 6 Site MCP Badung (PO
                                                                  Rp.79.920.000,-PPN Rp.3.168.000,- Potongan
236      1-Dec-23         MANDIRI IDR          1220011559559      PPh 4(2) 3.5% Rp.1.008.000,- )                               3,168,000           -       3,168,000             -          3,168,000
                                                                  HANDASA KONSULTAN, PT , Pelunasan 20%
                                                                  untuk Biaya Kebutuhan Jasa Pengurusan
                                                                  Sertifikat Laik Fungsi (SLF) 8 Site Badung (PO
                                                                  Rp.158.730.000,- PPN Rp.1.936.000,- Potongan
237      1-Dec-23         MANDIRI IDR          1220011559559      PPh 4(2) 3.5% Rp.616.000,-                                  18,920,000    17,600,000     1,936,000        616,000        18,920,000
                                                                  AREA BADUNG , Akuisisi Perpanjangan untuk
                                                                  sewa lahan site 09 Darmasaba seluas 300 m2
                                                                  dan 163,8 m2 jangka waktu 10 tahun Periode 2
                                                                  April 2028-2 April 2038(PO Rp.666.666.666,-
238      1-Dec-23         MANDIRI IDR          1220011559559      Potongan PPh 4(2) 10% Rp.66.666.666,- )                    211,900,000   235,444,444                   23,544,444       211,900,000
                                                                  AREA BADUNG , Akuisisi Perpanjangan untuk
                                                                  sewa lahan site 09 Darmasaba seluas 300 m2
                                                                  dan 163,8 m2 jangka waktu 10 tahun Periode 2
                                                                  April 2028-2 April 2038(PO Rp.666.666.666,-
239      1-Dec-23         MANDIRI IDR          1220011559559      Potongan PPh 4(2) 10% Rp.66.666.666,- )                    388,100,000   431,222,222                   43,122,222       388,100,000
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Pole FO Round 9M Black
240      1-Dec-23         MANDIRI IDR          1220011559559      Painting sebanyak 100 Unit                                 199,800,000   180,000,000    19,800,000             -        199,800,000
                                                                  MONETI INDO TEKNO, PT , Pembelian Cable
                                                                  Power NYFGBY 4x16MM Kabelindo Sebanyak
241      1-Dec-23         MANDIRI IDR          1220011559559      2.000m                                                     349,650,000   315,000,000    34,650,000             -        349,650,000
                                                                  WHIDIA BHARAYA, PT , Jasa Soil Test site MP
242      1-Dec-23         MANDIRI IDR          1220011559559      Gambir-001                                                   3,762,500     3,500,000      385,000         122,500         3,762,500
                                                                  WHIDIA BHARAYA, PT , Jasa Soil Test site
243      1-Dec-23         MANDIRI IDR          1220011559559      Ungasan-003                                                  3,762,500     3,500,000      385,000         122,500         3,762,500
                                                                  WHIDIA BHARAYA, PT , Jasa Soil Test site Mekar
244      1-Dec-23         MANDIRI IDR          1220011559559      Bhuana-002                                                   3,762,500     3,500,000      385,000         122,500         3,762,500
                                                                  JIG NUSANTARA PERSADA, PT , Tagihan Retensi
                                                                  10% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Jakarta Pusat - Akses Site - Relokasi Kebon
245      1-Dec-23         MANDIRI IDR          1220011559559      Sirih                                                       33,132,564    30,579,200     3,363,712        810,348        33,132,564
                                                                  FANAH JAYA MAINDO, PT , Pembelian Dust
246      1-Dec-23         MANDIRI IDR          1220011559559      Cover Adapter LC Port Sebanyak 1.000 Pcs                     3,996,000     3,600,000      396,000              -          3,996,000
                                                                  PANCA PUTRA SOLUSINDO, PT , Pembelian
                                                                  Mikrotik Router CCR2116-12G-4S+ Sebanyak 1
247      1-Dec-23         MANDIRI IDR          1220011559559      Unit                                                        20,202,000    18,200,000     2,002,000             -         20,202,000

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build
248      1-Dec-23         MANDIRI IDR          1220011559559      Jakarta Utara - Akses Site - Semper Barat-010                6,563,380     6,134,000      674,740         245,360         6,563,380
                                                                  AREA KAB TANGERANG , Uang Muka Beban
                                                                  Umum atas DP 30 % Biaya sewa lahan site
                                                                  Panongan-002 - Private Land (15 Tahun) /
                                                                  707184 priroity XL - Kab. Tangerang -
249      1-Dec-23         MANDIRI IDR          1220011559559      PR:1010035899 -Trf                                          49,500,000    49,500,000           -               -         49,500,000
                                                                  GARDDHA ADHIGUNA , Tagihan 100% atas
                                                                  Pekerjaan Install 2dn Bordest Site Kayu Putih-
250      1-Dec-23         MANDIRI IDR          1220011559559      019                                                          1,131,000     1,160,000           -           29,000         1,131,000

                                                                  YUYUN MUNADHI , Tagihan 100% atas Pekerjaan
251      1-Dec-23         MANDIRI IDR          1220011559559      Perbaikan FO Cut Jalur FO site Kebunan-001                   1,123,694     1,152,506           -           28,812         1,123,694

                                                                  YUYUN MUNADHI , Tagihan 100% atas Pekerjaan
252      1-Dec-23         MANDIRI IDR          1220011559559      Pemindahan Tiang FO Jalur site Kradenan-004                   756,704       776,106            -           19,402          756,704
Page 80
                                                                                              Page 17
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                      NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO CCTV Link Down
253      1-Dec-23         MANDIRI IDR          1220011559559      Site Ciracas-010                                           3,074,843    2,873,685      316,105         114,947         3,074,843
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Kabel FO CCTV Link Down Site Pulo
254      1-Dec-23         MANDIRI IDR          1220011559559      Gadung-010                                                 1,853,973    1,732,685      190,595          69,307         1,853,973
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Jovis Tiang Miring dan
255      1-Dec-23         MANDIRI IDR          1220011559559      Kabel Landai Site Ancol-013                                5,143,367    4,806,885      528,757         192,275         5,143,367
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Tiang Miring dan Kabel
                                                                  Landai serta Pemasangan Accessories Site
256      1-Dec-23         MANDIRI IDR          1220011559559      Kayuringin Jaya-015                                        6,359,957    5,943,885      653,827         237,755         6,359,957
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Dismantle Kabel dan Perbaikan Tiang
257      1-Dec-23         MANDIRI IDR          1220011559559      FO Site Kelapa Gading Timur-005                            3,733,107    3,488,885      383,777         139,555         3,733,107
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel FO Landai dan
258      1-Dec-23         MANDIRI IDR          1220011559559      Instalasi Tiang FO Site MP-Duri Kepa-001                   5,364,643    5,013,685      551,505         200,547         5,364,643
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Reroute Complain
259      1-Dec-23         MANDIRI IDR          1220011559559      Lingkungan Site Gondangdia-006                             3,190,403    2,981,685      327,985         119,267         3,190,403
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO CCTV Link Down
260      1-Dec-23         MANDIRI IDR          1220011559559      Site Sunter Jaya-021                                       1,853,973    1,732,685      190,595          69,307         1,853,973
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penraikan Kabel FO CCTV Link Down
261      1-Dec-23         MANDIRI IDR          1220011559559      Site Kebon Kosong-010                                      3,941,543    3,683,685      405,205         147,347         3,941,543

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Ducting Impact
262      1-Dec-23         MANDIRI IDR          1220011559559      Kabel PLN Terbakar Site MP-Bangka-001                      6,612,691    6,180,085      679,809         247,203         6,612,691
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Ducting Impact
263      1-Dec-23         MANDIRI IDR          1220011559559      Bitten by animal Site Duren Seribu-002                     8,020,383    7,495,685      824,525         299,827         8,020,383
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Ducting Impact
264      1-Dec-23         MANDIRI IDR          1220011559559      Pelebaran Jalan Site Curug Wetan-006                       5,178,463    4,839,685      532,365         193,587         5,178,463
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi Tiang FO Impact Pekerjaan
                                                                  SDA dan Perbaikan Kabel FO Site MP-Cipedak-
265      1-Dec-23         MANDIRI IDR          1220011559559      001                                                        3,477,163    3,249,685      357,465         129,987         3,477,163
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Pekerjaan Penarikan FO Cut Ducting
266      1-Dec-23         MANDIRI IDR          1220011559559      Impact Vandalisme Site Rorotan-008                         7,037,053    6,576,685      723,435         263,067         7,037,053

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Reroute FO Impact
267      1-Dec-23         MANDIRI IDR          1220011559559      Revitalisasi Halte Transjakarta Site Cawang-001            2,649,197    2,475,885      272,347          99,035         2,649,197

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Dismantle Kabel FO Aerial ex Relokasi
268      1-Dec-23         MANDIRI IDR          1220011559559      Jl.Fatmawati Raya Site MP-Pondok Labu-001                  2,176,043    2,033,685      223,705          81,347         2,176,043
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Tiang FO dan Perbaikan
                                                                  Kabel FO Complain Binarmarga Site MP-Cipinang
269      1-Dec-23         MANDIRI IDR          1220011559559      Besar Selatan-002                                          2,541,769    2,375,485      261,303          95,019         2,541,769
Page 81
                                                                                               Page 18
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                           NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK     DPP            PPN             PPh         NET DIBAYARKAN
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Ducting Impact
270      1-Dec-23         MANDIRI IDR          1220011559559      Penertiban Sudin Site Selong-003                              2,866,193      2,678,685      294,655         107,147         2,866,193

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel Landai, Tiang Miring
271      1-Dec-23         MANDIRI IDR          1220011559559      dan Pemasangan Accessories Site MP-Ancol-001                  2,992,025      2,796,285      307,591         111,851         2,992,025
                                                                  DJAJA LISTRIK, PT , Pembelian Jet Cleaner Kyodo
                                                                  KDC 20A Sebanyak 1 Unit, Isolasi Listrik Scotch
272      4-Dec-23         MANDIRI IDR          1220011559559      Rubber 3M Sebanyak 10 Pcs,dll                                35,881,860     32,326,000     3,555,860             -         35,881,860
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
273      4-Dec-23         MANDIRI IDR          1220011559559      MP 30M Light sebanyak 10 Set                                438,635,400    438,635,400           -               -        438,635,400
                                                                  HANDASA KONSULTAN, PT , DP 40% atas Jasa
                                                                  Pengurusan Sertifikat Laik Fungsi (SLF) untuk site
274      4-Dec-23         MANDIRI IDR          1220011559559      Ciseureuh-014 - PPh                                            (191,800)           -             -          191,800          (191,800)
                                                                  HANDASA KONSULTAN, PT , DP 40% atas Jasa
                                                                  Pengurusan Sertifikat Laik Fungsi (SLF) untuk site
275      4-Dec-23         MANDIRI IDR          1220011559559      Ciseureuh-014                                                 5,480,000      5,480,000           -               -          5,480,000
                                                                  HANDASA KONSULTAN, PT , DP 40% atas Jasa
                                                                  Pengurusan Sertifikat Laik Fungsi (SLF) untuk site
276      4-Dec-23         MANDIRI IDR          1220011559559      Ciseureuh-014 - PPN                                            602,800             -        602,800              -           602,800
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
277      4-Dec-23         MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Menteng-010                     420,420        431,200            -           10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Gunung Sahari
278      4-Dec-23         MANDIRI IDR          1220011559559      Utara-013                                                      420,420        431,200            -           10,780          420,420

                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
279      4-Dec-23         MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Marunda-008                     420,420        431,200            -           10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Sungai Bambu-
280      4-Dec-23         MANDIRI IDR          1220011559559      016                                                            420,420        431,200            -           10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Pegangsaan
281      4-Dec-23         MANDIRI IDR          1220011559559      Dua-031                                                        420,420        431,200            -           10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
282      4-Dec-23         MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Galur-001                       420,420        431,200            -           10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
283      4-Dec-23         MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Kali Baru-003                   420,420        431,200            -           10,780          420,420

                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
284      4-Dec-23         MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Kayu Putih-006                  420,420        431,200            -           10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Pademangan
285      4-Dec-23         MANDIRI IDR          1220011559559      Barat-013                                                      420,420        431,200            -           10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
286      4-Dec-23         MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Senen-002                       420,420        431,200            -           10,780          420,420
                                                                  IWAN SOFYAN , Tagihan 100% atas Pekerjaan
                                                                  Rectification Pole MCP Tegal Munjul-02
287      4-Dec-23         MANDIRI IDR          1220011559559      Purwakarta                                                     560,625        575,000            -           14,375          560,625

                                                                  PLN PERSERO, PT , Token Pulsa Listrik Site
288      5-Dec-23         SINARMAS IDR          0002999994        Kerobokan Kelod_25 dan Biaya Admin Rp.2.500,-                 1,002,500      1,002,500           -               -          1,002,500
                                                                  NE GENSET BALI, TOKO , Biaya perbaikan
                                                                  Dinamo Starter untuk Kerusakan Genset site 43
                                                                  Dalung Permai (PO Rp.1.615.000,- Potongan PPh
289      5-Dec-23         SINARMAS IDR          0002999994        23(2%) Rp.32.300,- )                                          1,582,700      1,615,000           -           32,300         1,582,700
Page 82
                                                                                              Page 19
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP           PPN             PPh            NET DIBAYARKAN

                                                                  NE GENSET BALI, TOKO , Biaya penggantian 1
                                                                  unit Modul Depsea 4520 untuk kerusakan
                                                                  Genset site 44 Kuta (PO Rp.5.415.000,- Potongan
290      5-Dec-23         SINARMAS IDR          0002999994        PPh 23(2%) Rp.2.000,- dari jasa Rp.100.000,- )              5,413,000    5,415,000           -               2,000         5,413,000
                                                                  NE GENSET BALI, TOKO , Biaya Penggantian
                                                                  Battery Charger untuk kerusakan Genset Site_35
                                                                  Sangeh (PO Rp.1.710.000,- Potongan PPh 23(2%)
291      5-Dec-23         SINARMAS IDR          0002999994        Rp.2.000,- dari jasa Rp.100.000,- )                         1,708,000    1,710,000           -               2,000         1,708,000

                                                                  I KETUT DARTA , Biaya Paket Pekerjaan
                                                                  Pembuatan NIDI dan SLO Daya 7.700 VA Site
                                                                  751200 Kerobokan Kelod _025 (PO Rp.690.000,-
292      5-Dec-23         SINARMAS IDR          0002999994        Potongan PPh 21(2.5%) Rp.17.250,- )                          672,750      690,000            -           17,250             672,750
                                                                  I KETUT DARTA , Biaya Paket Pekerjaan
                                                                  Pembuatan NIDI dan SLO Daya 7.700 VA Site
                                                                  211246 Ungasan_009 (PO Rp.690.000,-
293      5-Dec-23         SINARMAS IDR          0002999994        Potongan PPh 21(2.5%) Rp.17.250,- )                          672,750      690,000            -           17,250             672,750
                                                                  I KETUT DARTA , Biaya Paket Pekerjaan
                                                                  Pembuatan NIDI dan SLO Daya 7.700 VA Site
                                                                  211247 Jimbaran_029 (PO Rp.690.000,-
294      5-Dec-23         SINARMAS IDR          0002999994        Potongan PPh 21(2.5%) Rp.17.250,- )                          672,750      690,000            -           17,250             672,750
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Abiansemal_001 dan Biaya Admin
295      5-Dec-23         SINARMAS IDR          0002999994        Rp.5.000,-                                                  7,976,300    7,976,300           -                 -           7,976,300
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Biaya
                                                                  Perbaikan Akses Jalan Site JBN_10 Pendem (PO
                                                                  Rp.6.340.596,- PPN Rp.628.347,- Potongan PPh
296      6-Dec-23         MANDIRI IDR          1220011559559      4(2) 1.75% Rp.99.964,-                                      6,240,632    5,712,249      628,347          99,964            6,240,632
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Biaya
                                                                  Perbaikan Tembok pagar Site JBN_10 Pendem
                                                                  (PO Rp.28.985.983,- PPN Rp.2.870.502,-
297      6-Dec-23         MANDIRI IDR          1220011559559      Potongan PPh 4(2) 1.75% Rp.456.671,- )                     28,509,311   26,095,480     2,870,502        456,671           28,509,311

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  90% atas Penarikan Kabel FO Final as Build Kota
298      6-Dec-23         MANDIRI IDR          1220011559559      Sukabumi - Akses Site - Cibeureum Hillir-001               26,472,057   24,230,715     2,665,379        424,037           26,472,057
                                                                  SHOPEE INDONESIA , Biaya Pengadaan Tools
                                                                  untuk kebutuhan Project Pengukuran Verticality
299      6-Dec-23         MANDIRI IDR          1220011559559      Wilayah Jabodetabek - MCP Project                           1,033,250    1,033,250           -                 -           1,033,250
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi 1 Pekerjaan Instalasi Tiang &
                                                                  ME Grounding & Accessories Pole Octagonal 21
300      6-Dec-23         MANDIRI IDR          1220011559559      M Site Kamal-003                                           36,454,063   33,367,563     3,670,432        583,932           36,454,063

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
301      6-Dec-23         MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Ancol-031                   27,551,332   25,218,610     2,774,047        441,325           27,551,332
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi 1 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Pole Beton 14/900 Site Karang
302      6-Dec-23         MANDIRI IDR          1220011559559      Anyar-004                                                  10,499,941    9,610,930     1,057,202        168,191           10,499,941
                                                                  RAJA AMERTHA DEWATA, PT , Biaya Pekerjaan
                                                                  Restorasi FO Link Site_34 Mumbul to Site_40
                                                                  BTDC Nusa Dua, Badung ? Bali.(PO
                                                                  Rp.17.250.421,- PPN Rp.1.897.546,- Potongan
303      6-Dec-23         MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.301.882,-)                               18,846,085   17,250,421     1,897,546        301,882           18,846,085
Page 83
                                                                                              Page 20
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK     DPP            PPN             PPh         NET DIBAYARKAN
                                                                  DUTA CIPTA SARANA, PT , Tagihan 100% atas
                                                                  Pekerjaan Civil Work Tiang Pole Octagonal Steel
304      7-Dec-23         MANDIRI IDR          1220011559559      21 M - Site Kerobokan Kelod-24                            25,557,659     23,393,738     2,573,311        409,390        25,557,659
                                                                  DUTA CIPTA SARANA, PT , Tagihan 100% atas
                                                                  Paket Pekerjaan Perkuatan MP30 - Site M_85
305      7-Dec-23         MANDIRI IDR          1220011559559      Buduk Utara                                               69,062,709     63,215,294     6,953,682      1,106,267        69,062,709
                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  peket Pekerjaan Civil Work Tiang Pole Octagonal
                                                                  Stell 21m Site 751226 Kuta_028 (PO
                                                                  Rp.26.035.597,- PPN Rp.2.580.104,- Potongan
306      7-Dec-23         MANDIRI IDR          1220011559559      PPh 4(2) 2.65% Rp.621.571,- )                             25,414,026     23,455,493     2,580,104        621,571        25,414,026
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Bandung - Akses Site - Alun-Alun
307      7-Dec-23         MANDIRI IDR          1220011559559      Cicendo                                                   12,171,043     11,233,080     1,235,639        297,676        12,171,043
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Bandung - Akses Site - Masjid Raya
308      7-Dec-23         MANDIRI IDR          1220011559559      Cipaganti                                                 11,722,083     10,818,720     1,190,059        286,696        11,722,083
                                                                  HUME SAKTI INDONESIA, PT , DP 45% atas
                                                                  Pengadaan Concrete Pole Fabrication Type 14M -
309      7-Dec-23         MANDIRI IDR          1220011559559      900 daN sebanyak 100 Batang - PPh                        (20,117,475)           -             -       20,117,475       (20,117,475)
                                                                  HUME SAKTI INDONESIA, PT , DP 45% atas
                                                                  Pengadaan Concrete Pole Fabrication Type 14M -
310      7-Dec-23         MANDIRI IDR          1220011559559      900 daN sebanyak 100 Batang                              203,352,475    203,352,475           -               -        203,352,475
                                                                  HUME SAKTI INDONESIA, PT , DP 45% atas
                                                                  Pengadaan Concrete Pole Fabrication Type 14M -
311      7-Dec-23         MANDIRI IDR          1220011559559      900 daN sebanyak 100 Batang - PPN                         75,915,000            -      75,915,000             -         75,915,000
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan Modular ACPDB-DCPDB 3 Phase
312      7-Dec-23         MANDIRI IDR          1220011559559      sebanyak 9 Pcs                                            98,401,500     88,650,000     9,751,500             -         98,401,500

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 27U V3.0 2 Door 10Pcs, ODC
                                                                  27U V2.1 1 Door 10Pcs, ODC 27U&15UBracket
                                                                  20Pcs, ODC 27U&15U Bracket Longdrat 80Pcs,
313      7-Dec-23         MANDIRI IDR          1220011559559      ODC 27U Electrical 10Pcs                                 337,362,300    303,930,000    33,432,300             -        337,362,300

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 27U V3.0 2 Door 5Pcs, ODC 27U
                                                                  V2.1 1 Door 5Pcs, ODC 27U&15UBracket 10Pcs,
                                                                  ODC 27U&15U Bracket Longdrat 40Pcs, ODC 27U
314      7-Dec-23         MANDIRI IDR          1220011559559      Electrical 5Pcs                                          168,681,150    151,965,000    16,716,150             -        168,681,150

                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
315      7-Dec-23         MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Paledang-001               26,964,100     24,886,110     2,737,472        659,482        26,964,100

                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
316      7-Dec-23         MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Buaran Indah-005           26,964,100     24,886,110     2,737,472        659,482        26,964,100
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Baja
317      7-Dec-23         MANDIRI IDR          1220011559559      Monopole Octagonal 26 M Site Bedahan-006                  69,633,200     64,266,913     7,069,360      1,703,073        69,633,200
                                                                  AREA DENPASAR , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan Kontribusi Banjar
                                                                  Site 750078 Padangsambian-001 Selama 10
                                                                  Tahun (PO Rp.26.498.840,- Potongan PPh 21(3%)
318      11-Dec-23        SINARMAS IDR          0002999994        Rp.494.840,-)                                             26,000,000     26,498,840           -          498,840        26,000,000
Page 84
                                                                                              Page 21
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  AREA BADUNG , Akuisisi site 750078
                                                                  Padangsambian 001 seluas 4m2, jangka waktu
                                                                  10 tahun periode 2023-2033(PO
                                                                  Rp.222.222.222,- Potongan PPh 4(2) 10%
319      11-Dec-23        MANDIRI IDR          1220011559559      Rp.22.222.222,-)                                          200,000,000   200,000,000             -             -        200,000,000
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Sungai Bambu-
320      11-Dec-23        MANDIRI IDR          1220011559559      005                                                          420,420       431,200              -         10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Kelapa Gading
321      11-Dec-23        MANDIRI IDR          1220011559559      Barat-021                                                    420,420       431,200              -         10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
322      11-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Paseban-001                   420,420       431,200              -         10,780          420,420
                                                                  POLA REKAYASA UTAMA, PT , Jasa Analisa
                                                                  Struktur Pole, Analisa Pondasi, Design Perkuatan
                                                                  dan Analisa Perkuatan Pondasi site M_58 Pecatu
323      11-Dec-23        MANDIRI IDR          1220011559559      Kangin MP 30m                                               7,875,000     7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Analisa
                                                                  Kapasitas Pole, Analisa Kapasitas Pondasi,
                                                                  Perkuatan Pole dan Analisa Perkuatan Pondasi
324      11-Dec-23        MANDIRI IDR          1220011559559      site M_86 Raya Sading MP 30m                                7,875,000     7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Analisa
                                                                  Kapasitas Pole, Analisa Kapasitas Pondasi,
                                                                  Perkuatan Pole dan Analisa Perkuatan Pole site
325      11-Dec-23        MANDIRI IDR          1220011559559      M_75 Gajah Sura MP 30m                                      7,875,000     7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Analisa
                                                                  Kapasitas Pole, Analisa Kapasitas Pondasi,
                                                                  Perkuatan Pole dan Analisa Perkuatan Pondasi
326      11-Dec-23        MANDIRI IDR          1220011559559      site M_85 Buduk Utara MP 30m                                7,875,000     7,500,000      825,000         450,000         7,875,000
                                                                  PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                  Bracket Dead End Noise D 25-50MM 24 Core
327      12-Dec-23        MANDIRI IDR          1220011559559      Sebanyak 30 Set                                              616,050       555,000           61,050           -           616,050
                                                                  KESA UTAMA SEJAHTERA, PT , Tagihan 90%
                                                                  Paket Pekerjaan Perkuatan MP 30M Site M_90
                                                                  Jimbaran Uluwatu( PO Rp.107.122.767,- PPN
                                                                  Rp.9.554.193,- Potongan PPh 4(2) 1.75%
328      13-Dec-23        MANDIRI IDR          1220011559559      Rp.1.519.985,- )                                           94,890,505    86,856,297     9,554,193      1,519,985        94,890,505
                                                                  KESA UTAMA SEJAHTERA, PT , Pekerjaan Civil
                                                                  Work Tiang Pole Octagonal Steel 21 M Site
                                                                  751160 Dalung-003(Opname) (PO
                                                                  Rp.14.754.143,- PPN RP.1.462.122,- Potongan
329      13-Dec-23        MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.232.610,-)                               14,521,532    13,292,020     1,462,122        232,610        14,521,532
                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  paket Pekerjaan Civil Work Tiang Pole Octagonal
                                                                  Stell 21m Site 751188 Benoa_021 (PO
                                                                  Rp.30.577.818,- PPN Rp.3.030.234,- Potongan
330      13-Dec-23        MANDIRI IDR          1220011559559      PPh 4(2) 2.65% Rp.730.011,- )                              29,847,807    27,547,584     3,030,234        730,011        29,847,807
                                                                  DJAJA LISTRIK, PT , Pembelian Measuring
                                                                  Instrument Clamp Digital 2117R untuk Team
331      14-Dec-23        MANDIRI IDR          1220011559559      MCP Departement Sebanyak 5 Pcs                              5,883,000     5,300,000      583,000              -          5,883,000
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Cilangkap
332      14-Dec-23        MANDIRI IDR          1220011559559      Depok-004                                                    420,420       431,200              -         10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site MP-Cipinang
333      14-Dec-23        MANDIRI IDR          1220011559559      Muara-001                                                    420,420       431,200              -         10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
334      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Beji-015                      420,420       431,200              -         10,780          420,420
Page 85
                                                                                               Page 22
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Penjaringan-
335      14-Dec-23        MANDIRI IDR          1220011559559      032                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
336      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Curug-001                       420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
337      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Pluit-055                       420,420      431,200           -            10,780          420,420

                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
338      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Meruyung-001                    420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Sawangan Baru-
339      14-Dec-23        MANDIRI IDR          1220011559559      001                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Rawabadak
340      14-Dec-23        MANDIRI IDR          1220011559559      Utara-009                                                      420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
341      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Ratujaya-014                    420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Penjaringan-
342      14-Dec-23        MANDIRI IDR          1220011559559      041                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Penjaringan-
343      14-Dec-23        MANDIRI IDR          1220011559559      010                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Penjaringan-
344      14-Dec-23        MANDIRI IDR          1220011559559      016                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Penjaringan-
345      14-Dec-23        MANDIRI IDR          1220011559559      019                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Pisangan Timur-
346      14-Dec-23        MANDIRI IDR          1220011559559      007                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
347      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Pluit-034                       420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
348      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Lagoa-012                       420,420      431,200           -            10,780          420,420

                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
349      14-Dec-23        MANDIRI IDR          1220011559559      Pengelasan RRU Tenant IOH Site Pasir Putih-005                 420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Pasir Pejagalan-
350      14-Dec-23        MANDIRI IDR          1220011559559      004                                                            420,420      431,200           -            10,780          420,420
                                                                  APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                                  Pengelasan RRU Tenant IOH Site Pasir Pejagalan-
351      14-Dec-23        MANDIRI IDR          1220011559559      007                                                            420,420      431,200           -            10,780          420,420
                                                                  KALIABANG JAYA PRATAMA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Selatan - Akses Site - CSR Jakwifi - Bukit
352      14-Dec-23        MANDIRI IDR          1220011559559      Duri RW12                                                     6,439,133    5,942,900      653,719         157,486         6,439,133

                                                                  KALIABANG JAYA PRATAMA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
353      14-Dec-23        MANDIRI IDR          1220011559559      Jakarta Pusat - Akses Site - Kebon Kelapa-005                 5,495,170    5,071,684      557,885         134,399         5,495,170
                                                                  AREA KOTA PEKALONGAN , Uang Muka Beban
                                                                  Umum atas DP 20% biaya sewa lahan site
                                                                  Kauman Pekalongan-002/ 421001 priroity XL -
                                                                  Kota Pekalongan selama 15 tahun - PR
354      14-Dec-23        MANDIRI IDR          1220011559559      :1010036050 -Trf                                             51,300,000   51,300,000          -                -         51,300,000
Page 86
                                                                                               Page 23
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                           NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN           NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  SURYA ANUGRAH ENJINERING, PT , Tagihan
                                                                  100% atas Pengadaan Tower Combat 25M
355      14-Dec-23        MANDIRI IDR          1220011559559      sebanyak 2 Set                                             710,400,000    640,000,000     70,400,000             -        710,400,000

                                                                  MONETI INDO TEKNO, PT , Pembelian Cage Nut-
                                                                  Screw D 6mm L 20mm Sepasang Sebanyak 1.000
                                                                  Pcs, Cable Duct L 1.700mm W 25mm PVC 50 Btg,
356      15-Dec-23        MANDIRI IDR          1220011559559      Headlamp-Running Sebanyak 2 Unit                             2,758,350      2,485,000       273,350              -          2,758,350
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
357      15-Dec-23        MANDIRI IDR          1220011559559      17.041m                                                  2,195,666,899   2,009,763,751   221,074,013     35,170,865     2,195,666,899

                                                                  BIBIT , Biaya Pekerjaan Pemindahan Pole akibat
                                                                  complain pemilik lahan Site Pangsan-001 dan
                                                                  Pengecatan dan Perbaikan Pole FO Existing Site
                                                                  MCP Dauh Puri Kelod-010 (PO Rp.3.388.154,-
358      18-Dec-23        SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.304.934,-)                            3,083,220      3,388,154            -          304,934         3,083,220
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Combat Tibubeneng_003 dan
359      18-Dec-23        SINARMAS IDR          0002999994        Biaya Admin Rp.5.000,-                                       7,976,300      7,976,300            -               -          7,976,300

                                                                  PLN PERSERO, PT , Biaya administrasi registrasi
                                                                  sambungan sementara (multi guna) PLN site
360      18-Dec-23        SINARMAS IDR          0002999994        Sibang Kaja 004 dan Biaya Admin Rp.3.000,-                    956,821         956,821            -               -           956,821

                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1104-016 FO
                                                                  Link FO GNY_04 to Sukawati_002 Jln. Sukma
                                                                  Kesuma Ubud Gianyar(PO Rp.4.139.550,-
361      18-Dec-23        SINARMAS IDR          0002999994        Potongan PPh 21(9%) Rp.372.560,-)                            3,766,990      4,139,550            -          372,560         3,766,990
                                                                  IMAM TAUFIK , Biaya Perbaikan FO Cut TT.I1103-
                                                                  027 FO Link BLL_08 to BLL_16 - Jl. Raya Bedugul -
                                                                  Singaraja, Gitgit Sukasada Buleleng (PO
                                                                  Rp.1.727.400,- Potongan PPh 21(3%) Rp.51.822,-
362      18-Dec-23        SINARMAS IDR          0002999994        )                                                            1,675,578      1,727,400            -           51,822         1,675,578
                                                                  PEMERINTAH KOTA SURAKARTA , Uang Muka
                                                                  Beban Umum atas Biaya Pelayanan Penerbitan
                                                                  Kesesuaian Kegiatan Pemanfaatan Ruang Site
                                                                  Setabelan-007 Wilayah Kota Surakarta -
363      19-Dec-23        MANDIRI IDR          1220011559559      PR:1010036390 - Trf                                          2,600,505      2,600,505            -               -          2,600,505
                                                                  PEMERINTAH KOTA SURAKARTA , Uang Muka
                                                                  Beban Umum atas Biaya Pelayanan Penerbitan
                                                                  Kesesuaian Kegiatan Pemanfaatan Ruang Site
                                                                  Sangkrah-001 Wilayah Kota Surakarta -
364      19-Dec-23        MANDIRI IDR          1220011559559      PR:1010036385-Trf                                            2,600,229      2,600,229            -               -          2,600,229
                                                                  PEMERINTAH KOTA SURAKARTA , Uang Muka
                                                                  Beban Umum atas Biaya Pelayanan Penerbitan
                                                                  Kesesuaian Kegiatan Pemanfaatan Ruang Site
                                                                  Jagalan-010 Wilayah Kota Surakarta - PR:
365      19-Dec-23        MANDIRI IDR          1220011559559      1010036383 - Trf                                             2,600,501      2,600,501            -               -          2,600,501
                                                                  PEMERINTAH KOTA SURAKARTA , Uang Muka
                                                                  Beban Umum atas Biaya Pelayanan Penerbitan
                                                                  Kesesuaian Kegiatan Pemanfaatan Ruang Site
                                                                  Tipes-010 Wilayah Kota Surakarta- PR
366      19-Dec-23        MANDIRI IDR          1220011559559      :1010036381 - Trf                                            2,600,503      2,600,503            -               -          2,600,503
                                                                  PEMERINTAH KOTA SURAKARTA , Uang Muka
                                                                  Beban Umum atas Biaya Pelayanan Penerbitan
                                                                  Kesesuaian Kegiatan Pemanfaatan Ruang Site
                                                                  Jebres-025 Wilayah Kota Surakarta - PR:
367      19-Dec-23        MANDIRI IDR          1220011559559      1010036361 - Trf                                             2,600,505      2,600,505            -               -          2,600,505
Page 87
                                                                                               Page 24
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
368      19-Dec-23        MANDIRI IDR          1220011559559      15.882m                                                2,054,397,194   1,880,455,097   206,850,061     32,907,964     2,054,397,194
                                                                  PLN PERSERO, PT , Biaya Pasang Baru site
                                                                  421001 Kauman Pekalongan-002 Priority XL -
                                                                  Project Microcell Jawa Tengah Dibayarkan
369      19-Dec-23        MANDIRI IDR          1220011559559      langsung ke PLN                                           11,672,500     11,672,500            -               -         11,672,500
                                                                  AREA BADUNG , Akuisisi Site 751217 Canggu
                                                                  010 seluas 4m2, jangka waktu 10 tahun periode
                                                                  2023-2033(PO Rp.211.111.111,- Potongan PPh
370      20-Dec-23        MANDIRI IDR          1220011559559      4(2) 10% Rp.21.111.111,-)                                190,000,000    190,000,000            -               -        190,000,000
                                                                  DUTA HITA JAYA, PT , DP 30% atas Steel Pole
371      20-Dec-23        MANDIRI IDR          1220011559559      21M sebanyak 10 Set                                      335,650,410    335,650,410            -               -        335,650,410

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
372      20-Dec-23        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 8 Unit               349,872,000    315,200,000     34,672,000             -        349,872,000

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
373      20-Dec-23        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 2 Unit                87,468,000     78,800,000      8,668,000             -         87,468,000

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
374      20-Dec-23        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 2 Unit                87,468,000     78,800,000      8,668,000             -         87,468,000

                                                                  PLN PERSERO, PT , Biaya administrasi registrasi
                                                                  sambungan sementara (multi guna) PLN site
375      21-Dec-23        SINARMAS IDR          0002999994        Abiansemal-001dan Biaya Admin Rp.3.000,-                    956,821         956,821            -               -           956,821

                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan Kontribusi Banjar
                                                                  Site 751217 Site Canggu_010 (PO Rp.35.773.190,-
376      21-Dec-23        SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.773.190,-)                         35,000,000     35,000,000            -               -         35,000,000
                                                                  BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                                  100% Paket Pekerjaan FO Network Optimization
377      21-Dec-23        MANDIRI IDR          1220011559559      15.531m                                                2,101,268,290   1,923,357,702   211,569,347     33,658,759     2,101,268,290
                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1106-005 FO
                                                                  Link BLL_16 to BLL_08 Jl. Bedugul - Singaraja,
                                                                  Gitgit, Buleleng(PO Rp.3.662.350,-Potongan PPh
378      21-Dec-23        SINARMAS IDR          0002999994        21(9%) Rp.329.612,-)                                       3,332,738      3,662,350            -          329,612         3,332,738
                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1110-012
                                                                  Manuver core FO Link Site_05 to Tuban_001 di
                                                                  HH_02 Grahadi(PO Rp.1.175.000,- Potongan PPh
379      21-Dec-23        SINARMAS IDR          0002999994        21(9%) Rp.105.750,-)                                       1,069,250      1,175,000            -          105,750         1,069,250
                                                                  BIBIT , Biaya Perbaikan FO Cut TT.I1102-022 FO
                                                                  Link S16 to S07 Jln. Pura Batu Pageh, Ungasan -
                                                                  Badung (PO Rp.4.677.500,- Potongan PPh 21(9%)
380      21-Dec-23        SINARMAS IDR          0002999994        Rp.420.975,-)                                              4,256,525      4,677,500            -          420,975         4,256,525
                                                                  PLN PERSERO, PT , Biaya Pasang Baru site
                                                                  421001 Kauman Pekalongan-002 Priority XL -
                                                                  Project Microcell Jawa Tengah Dibayarkan
381      21-Dec-23        MANDIRI IDR          1220011559559      langsung ke PLN                                           12,033,900     12,033,900            -               -         12,033,900
                                                                  EDI SLAMET , Biaya Pekerjaan New Site
                                                                  Collocation Tsel Site 751180 Kerobokan
                                                                  Kelod_024 (PO Rp.2.729.999,- Potongan PPh
382      27-Dec-23        SINARMAS IDR          0002999994        21(2.5%) Rp.68.250,-)                                      2,661,749      2,729,999            -           68,250         2,661,749
Page 88
                                                                                              Page 25
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  PLN PERSERO, PT , Biaya Pasang Baru Listrik PLN
                                                                  7.700 VA Site Padangsambian_001 dan Biaya
383      27-Dec-23        SINARMAS IDR          0002999994        Administrasi Rp.5.000,-                                    7,976,300      7,976,300            -               -          7,976,300
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
384      27-Dec-23        MANDIRI IDR          1220011559559      Pole FO Round 7M sebanyak 1.000 Unit - PPN                38,610,000             -      38,610,000             -         38,610,000
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
385      27-Dec-23        MANDIRI IDR          1220011559559      MP 30M Light sebanyak 2 Set - PPN                          9,649,978             -       9,649,978             -          9,649,978
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
386      27-Dec-23        MANDIRI IDR          1220011559559      MP 36m Octagonal sebanyak 9 Set - PPN                     45,207,605             -      45,207,605             -         45,207,605
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Anchor sebanyak 72 Pcs dan
387      27-Dec-23        MANDIRI IDR          1220011559559      Plate Setting sebanyak 18 Pcs                             11,231,067     11,231,067            -               -         11,231,067
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Anchor sebanyak 16 Pcs dan
388      27-Dec-23        MANDIRI IDR          1220011559559      Plate Setting sebanyak 4 Pcs                               2,495,933      2,495,933            -               -          2,495,933
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
389      27-Dec-23        MANDIRI IDR          1220011559559      atas Pengadaan MP 30M Light sebanyak 2 Set               202,200,587    202,200,587            -               -        202,200,587
                                                                  PEMERINTAH KABUPATEN SLEMAN , Uang Muka
                                                                  Beban Umum atas Biaya Sewa Lahan
                                                                  Penempatan Fiber Optik Ruas Jalan BBWSSO
                                                                  Wilayah Kabupaten Sleman selama 5 tahun (01
                                                                  Desember 2023 - 30 November 2028) -
390      27-Dec-23        MANDIRI IDR          1220011559559      PR:1010036099 - Trf                                      466,973,000    466,973,000            -               -        466,973,000
                                                                  PEMERINTAH KOTA SURAKARTA , Uang Muka
                                                                  Beban Umum atas Biaya Sewa Lahan
                                                                  Perpanjangan Penempatan 98 Site MCP Wilayah
                                                                  Kota Surakarta Periode 3 Tahun 2023 - 2026 -
391      28-Dec-23        MANDIRI IDR          1220011559559      PR:1010036137-Trf                                      1,761,000,000   1,761,000,000           -               -      1,761,000,000

                                                                  PEMERINTAH KOTA SEMARANG , Uang Muka
                                                                  Beban Umum atas Biaya Sewa Lahan
                                                                  Perpanjangan Penempatan 12 Site MCP Wilayah
                                                                  Kota Semarang Periode 16 November 2023 s/d
392      28-Dec-23        MANDIRI IDR          1220011559559      15 November 2028 - PR : 1010036120 - Trf               1,870,186,500   1,870,186,500           -               -      1,870,186,500
                                                                  EDI SLAMET , Biaya Pekerjaan Penarikan Kabel
                                                                  Power PLN Site 751168 Tumbak Bayuh-003 (PO
                                                                  Rp. 1.743.200,- Potongan PPh 21(2.5%) Rp.
393      29-Dec-23        SINARMAS IDR            2999994         43.580,- )                                                 1,699,620      1,743,200            -           43,580         1,699,620
                                                                  PLN PERSERO, PT , Biaya upgrade daya PLN dari
                                                                  10.600 VA ke 16.500 VA siteM206 Sanggar
394      29-Dec-23        SINARMAS IDR            2999994         Buana                                                      6,700,600      6,700,600            -               -          6,700,600
                                                                  IMAM TAUFIK , Biaya Perbaikan FO Cut TT.I1117-
                                                                  005 FO Link aksess MCP Kedongan_006 Jln. Raya
                                                                  Uluwatu, Kedonganan Badung)(PO
                                                                  Rp.1.696.400,- Potongan PPh 21(3%) Rp.50.892,-
395      29-Dec-23        SINARMAS IDR          0002999994        )                                                          1,645,508      1,696,400            -           50,892         1,645,508
                                                                  BIBIT , Biaya Pekerjaan perbaikan FO Cut
                                                                  TT.I1117-001 FO Link M42 to M20, M39 dan
                                                                  Tibubeneng001 Jl. Pantai Berawa(PO
                                                                  Rp.4.466.600,- Potongan PPh 21(9%)
396      29-Dec-23        SINARMAS IDR          0002999994        Rp.401.994,- )                                             4,064,606      4,466,600            -          401,994         4,064,606
                                                                  BIBIT , Biaya Perbaikan FO Cut TT.I1116-024
                                                                  Relokasi FO aksess M_90 impact proyek
                                                                  Sidewalk Jimbaran)(PO Rp.4.634.500,- Potongan
397      29-Dec-23        SINARMAS IDR          0002999994        PPh 21(9%) Rp.417.105,- )                                  4,217,395      4,634,500            -          417,105         4,217,395
Page 89
                                                                                               Page 26
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN

                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1117-010 FO
                                                                  Cut Sukawati 002 to DPS_02 & Kertalangu_005
                                                                  Jl. WR Supratman)(PO Rp.960.000,-Potongan
398      29-Dec-23        SINARMAS IDR          0002999994        PPh 21(9%) Rp.86.400,- )                                      873,600      960,000            -           86,400          873,600

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
399      2-Jan-24         MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Karang Anyar-004             27,551,332   25,218,610     2,774,047        441,325        27,551,332
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Dismantle ME Telematika &
                                                                  Accessories Telematika 14/900 Site Karang Anyar-
400      2-Jan-24         MANDIRI IDR          1220011559559      004                                                         10,538,420    9,646,150     1,061,077        168,807        10,538,420
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi 1 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Monopole 26 M Site Suka
401      2-Jan-24         MANDIRI IDR          1220011559559      Damai-006                                                   20,120,981   18,417,374     2,025,911        322,304        20,120,981
                                                                  SIDO AGUNG MANDIRI, PT , Pembelian
                                                                  Patchcord FC/UPC-FC/UPC SM Duplex 1 Mtr
                                                                  Sebanyak 350 Pcs, Patchcord FC/UPC-LC/UPC
                                                                  SM Duplex 2 Mtr Sebanyak 1.200 Pcs, Patchcord
                                                                  FC/UPC-LC/UPC SM Duplex 5 Mtr Sebanyak 150
402      2-Jan-24         MANDIRI IDR          1220011559559      Pcs                                                         42,846,000   38,600,000     4,246,000             -         42,846,000
                                                                  SIDO AGUNG MANDIRI, PT , Pembelian
                                                                  Patchcord SC/UPC-SC/UPC SM Duplex 5 Mtr
                                                                  Sebanyak 50 Pcs, Pembelian Patchcord LC/UPC-
                                                                  SC/UPC SM Duplex 3 Mtr Sebanyak 50 Pcs,
                                                                  Pembelian Patchcord LC/UPC-SC/UPC SM Duplex
403      2-Jan-24         MANDIRI IDR          1220011559559      10 Mtr Sebanyak 25 Pcs                                       4,107,000    3,700,000      407,000              -          4,107,000
                                                                  MDT TOTAL SOLUTION, PT , Pembelian SFP
404      2-Jan-24         MANDIRI IDR          1220011559559      Copper 1GB 10KM Sebanyak 300 Unit                          108,225,000   97,500,000    10,725,000             -        108,225,000
                                                                  AURORA MULIA SAMBARU, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Utara - Akses Site - Semper Timur RW10 -
405      2-Jan-24         MANDIRI IDR          1220011559559      Jakwifi                                                      8,853,730    8,104,100      891,451         141,821         8,853,730
                                                                  AURORA MULIA SAMBARU, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Utara - Akses Site - Rawa Terate RW06 -
406      2-Jan-24         MANDIRI IDR          1220011559559      Jakwifi                                                      8,067,130    7,384,100      812,251         129,221         8,067,130

                                                                  AURORA MULIA SAMBARU, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
407      2-Jan-24         MANDIRI IDR          1220011559559      Jakarta Utara - Akses Site - Ancol RW01 - Jakwifi            6,464,694    5,917,340      650,907         103,553         6,464,694
                                                                  AURORA MULIA SAMBARU, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Utara - Akses Site - Tugu Utara RW18 -
408      2-Jan-24         MANDIRI IDR          1220011559559      Jakwifi                                                      6,183,397    5,659,860      622,584          99,047         6,183,397
                                                                  AURORA MULIA SAMBARU, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Utara - Akses Site - Rawabadak Utara
409      2-Jan-24         MANDIRI IDR          1220011559559      RW09                                                         6,901,300    6,316,980      694,867         110,547         6,901,300
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Jakarta Utara - Akses Site - Pademangan
410      2-Jan-24         MANDIRI IDR          1220011559559      Timur-006                                                   61,321,698   56,129,700     6,174,267        982,269        61,321,698
Page 90
                                                                                              Page 27
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  FANAH JAYA MAINDO, PT , Pembelian Kabel
                                                                  Power NYAF Red 4mm Sebanyak 100 Mtr, Kabel
                                                                  Power NYAF Black 4mm Sebanyak 100 Mtr,
                                                                  Kabel Power NYAF Yellow 4mm Sebanyak 100
411      4-Jan-24         MANDIRI IDR          1220011559559      Mtr                                                         2,890,440      2,604,000       286,440              -          2,890,440
                                                                  ASTAMA ADHI KARYA, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi Jl.Raya Serang Impact
                                                                  Pembangunan Underpass Bitung Site Curug
412      5-Jan-24         MANDIRI IDR          1220011559559      Wetan-006                                                  71,979,363     65,885,000      7,247,350      1,152,987        71,979,363
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Plate Setting sebanyak 30Pcs
413      5-Jan-24         MANDIRI IDR          1220011559559      dan Anchor sebanyak 240Pcs                                 38,894,101     38,894,101            -               -         38,894,101
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan MCP Pole 21M sebanyak 5 Unit
414      5-Jan-24         MANDIRI IDR          1220011559559      (Project Bali)                                            378,627,444    378,627,444            -               -        378,627,444
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan MCP Pole 21M sebanyak 10 Unit
415      5-Jan-24         MANDIRI IDR          1220011559559      (Project Bali)                                            757,254,890    757,254,890            -               -        757,254,890
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test &
416      5-Jan-24         MANDIRI IDR          1220011559559      Analisa Pondasi site Ungasan-007                            4,837,500      4,500,000       495,000         157,500         4,837,500
                                                                  PLN PERSERO, PT , Biaya registrasi sambungan
                                                                  baru PLN site 751217 Canggu-010 dan biaya
417      8-Jan-24         SINARMAS IDR          0002999994        Admin Rp. 5.000,-                                           7,976,300      7,976,300            -               -          7,976,300
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Pemasangan Tiang FO dan Perbaikan
418      8-Jan-24         MANDIRI IDR          1220011559559      Kabel FO Site MP-Kalideres-001                              8,645,264      7,913,285       870,461         138,482         8,645,264
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Impact Kabel Tanah Terbakar
419      8-Jan-24         MANDIRI IDR          1220011559559      Site Kelapa Gading Barat-037                               11,529,900     10,553,684      1,160,905        184,689        11,529,900
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan FO Cut Impact Pelebaran Jalan Raya
420      8-Jan-24         MANDIRI IDR          1220011559559      Serang Site Curug Wetan-006                                 2,682,836      2,455,685       270,125          42,974         2,682,836
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Site Upgrade Port
421      8-Jan-24         MANDIRI IDR          1220011559559      Lag MMR Data Center Batu Ceper                              2,773,732      2,538,885       279,277          44,430         2,773,732

                                                                  MORASHA INTI SHABIRA, PT , Tagihan 100 % atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build Kota
422      8-Jan-24         MANDIRI IDR          1220011559559      Bandung - Akses Site - Taman Tegalega                       6,058,459      5,545,500       610,005          97,046         6,058,459
                                                                  MORASHA INTI SHABIRA, PT , Tagihan 100 % atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build Kota
                                                                  Bandung - Akses Site - Forest Walk-Babakan
423      8-Jan-24         MANDIRI IDR          1220011559559      Siliwangi                                                   7,647,610      7,000,100       770,011         122,501         7,647,610
                                                                  ALIANSI INOVASI GLOBAL, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO as Build
424      8-Jan-24         MANDIRI IDR          1220011559559      Jakarta Selatan - Akses Site - Lebak Bulus-018              4,800,100      4,393,684       483,305          76,889         4,800,100
                                                                  BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                                  100% Paket Pekerjaan FO Network Optimization
425      8-Jan-24         MANDIRI IDR          1220011559559      16.319m                                                 2,176,897,611   1,992,583,626   219,184,198     34,870,213     2,176,897,611
                                                                  DUTA CIPTA SARANA, PT , Tagihan 100% atas
                                                                  Paket Pekerjaan Perkuatan MP30 - Site M_86
426      10-Jan-24        MANDIRI IDR          1220011559559      Raya Sading                                                55,414,398     50,722,561      5,579,481        887,644        55,414,398
                                                                  DUTA CIPTA SARANA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang & ME Grounding &
                                                                  Accessories Pole Octagonal 21 M Site Kerobokan
427      10-Jan-24        MANDIRI IDR          1220011559559      Kelod-024                                                  31,336,836     28,683,603      3,155,196        501,963        31,336,836
Page 91
                                                                                               Page 28
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN

                                                                  PEMERINTAH KOTA SURAKARTA , Uang Muka
                                                                  Beban Umum atas Biaya Sewa Lahan FO 5 Ruas
                                                                  Jalan (Jl.Sungai Indragiri,Jl.Bhayangkara,Jl.Sam
                                                                  Ratulangi,Jl.Hasanudin,Jl.Cipto M)Wilayah Kota
                                                                  Surakarta Periode 1 November 2023 s/d 1
                                                                  November 2024 (BATCH IV) - PR:1010036341-
428      10-Jan-24        MANDIRI IDR          1220011559559      Trf                                                        12,544,000    12,544,000           -               -         12,544,000

                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
429      12-Jan-24        MANDIRI IDR          1220011559559      Baja Octagonal 21 M Site Pademangan Barat-002              28,062,076    25,686,110     2,825,472        449,506        28,062,076
                                                                  PRYSMIAN CABLES INDONESIA, PT , Uang Muka
                                                                  Beban Umum atas Pengajuan Giro/Cek Mundur
                                                                  untuk kebutuhan kabel ADSS 48 Core Prysmian -
430      12-Jan-24        MANDIRI IDR          1220011559559      PO : 1010035413 - Trf                                     114,973,800   114,973,800           -               -        114,973,800
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Pole Fiber Optic Round 9M
431      12-Jan-24        MANDIRI IDR          1220011559559      sebanyak 60 Unit                                          119,880,000   108,000,000    11,880,000             -        119,880,000
                                                                  MEDIA FIROPTIX INDONESIA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Selatan - Akses Site - Relokasi JL.
432      12-Jan-24        MANDIRI IDR          1220011559559      RS.Fatmawati                                               83,437,503    76,373,000     8,401,030      1,336,527        83,437,503
                                                                  RONA PERSADA ANGKASA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Selatan - Akses Site Relokasi Kegiatan
                                                                  Strategis Daerah 2022 - Jalan Tebet Timur dan
433      16-Jan-24        MANDIRI IDR          1220011559559      Jalan Tebet Barat                                         170,291,854   157,168,300    17,288,513      4,164,959       170,291,854
                                                                  RONA PERSADA ANGKASA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Pusat - Akses Site - Relokasi
                                                                  Pembangunan Gapura China Town Jalan
434      16-Jan-24        MANDIRI IDR          1220011559559      Pancoran Glodok                                            15,522,655    14,326,400     1,575,904        379,649        15,522,655
                                                                  BALI NUSA DUA INDONESIA, PT , Biaya Sewa
                                                                  Backbone Event AMC ASIA - RED HAT EVENT
                                                                  2024. di Gedung BNDCC ITDC Nusa Dua Bali
                                                                  Tanggal 21-25 Januari 2024 (PO Rp.16.650.000,-
                                                                  Potongan PPh 23(2%) Rp.300.000,- dari jasa
435      17-Jan-24        SINARMAS IDR          0002999994        Rp.15.000.000,- )                                          16,350,000    15,000,000     1,650,000        300,000        16,350,000
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Pole
436      17-Jan-24        MANDIRI IDR          1220011559559      Octagonal Steel 21 M Site Kuta-026                         25,557,659    23,393,738     2,573,311        409,390        25,557,659

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Baja
437      17-Jan-24        MANDIRI IDR          1220011559559      Monopole Octagonal 26 M Site Kekeran-001                   71,358,075    65,316,315     7,184,795      1,143,035        71,358,075

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Baja
438      17-Jan-24        MANDIRI IDR          1220011559559      Monopole Octagonal 26 M Site Lukluk-001                    60,907,776    55,750,824     6,132,591        975,639        60,907,776
                                                                  BIBIT , Biaya Perbaikan FO Cut TT.I1123-008 FO
                                                                  Link M329 to Site_40 Jln. Pantai Peminge ITDC
                                                                  Nusa Dua(PO Rp.1.762.500,- Potongan PPh
439      17-Jan-24        SINARMAS IDR          0002999994        21(3%) Rp.52.875,-)                                         1,709,625     1,762,500           -           52,875         1,709,625
                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1201- 008 FO
                                                                  Link BLL_16 to BLL_08 - Jl. Bedugul -
                                                                  Singaraja,Buleleng (PO Rp.2.230.800,- Potongan
440      17-Jan-24        SINARMAS IDR          0002999994        PPh 21(3%) Rp.66.924,- )                                    2,163,876     2,230,800           -           66,924         2,163,876
Page 92
                                                                                               Page 29
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Relokasi 1 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Pole Octagonal 21 M Site
441      17-Jan-24        MANDIRI IDR          1220011559559      Paledang-001                                               15,783,116   14,446,787     1,589,147        252,818        15,783,116

                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
442      17-Jan-24        MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Ancol-008                   27,881,103   25,520,460     2,807,251        446,608        27,881,103

                                                                  ROSALINDO BHATARA SAKTI, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
443      17-Jan-24        MANDIRI IDR          1220011559559      Jakarta Timur - Akses Site - Ciracas RW 03                  4,278,930    3,999,000      439,890         159,960         4,278,930

                                                                  ROSALINDO BHATARA SAKTI, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
444      17-Jan-24        MANDIRI IDR          1220011559559      Jakarta Timur - Akses Site - Ceger RW 03                    6,845,004    6,397,200      703,692         255,888         6,845,004

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
445      17-Jan-24        MANDIRI IDR          1220011559559      Build Jakarta Timur - Akses Site - Ciracas-006              6,228,998    5,701,600      627,176          99,778         6,228,998
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Dismantle Tiang Beton
446      17-Jan-24        MANDIRI IDR          1220011559559      Sementara - Site Utan Kayu Selatan-003                     10,378,750    9,500,000     1,045,000        166,250        10,378,750
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
                                                                  Camouflage Clamp sebanyak 2.500Pcs dan Nut
447      17-Jan-24        MANDIRI IDR          1220011559559      Bolt sebanyak 2.500Pcs                                     64,344,750   64,344,750           -               -         64,344,750
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Paket Pekerjaan Perkuatan MP30 -
448      18-Jan-24        MANDIRI IDR          1220011559559      Site M_91 Kori                                             78,054,150   72,038,901     7,924,279      1,909,030        78,054,150
                                                                  SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                  100% atas Relokasi 1 Pekerjaan Instalasi Tiang &
                                                                  ME Grounding & Accessories Pole Octagonal 21
449      18-Jan-24        MANDIRI IDR          1220011559559      M Site Semper Barat-010                                    36,153,755   33,367,563     3,670,432        884,240        36,153,755

                                                                  SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                  100% atas Relokasi 1 Pekerjaan Instalasi Tiang &
                                                                  ME Grounding & Accessories Pole Octagonal
450      18-Jan-24        MANDIRI IDR          1220011559559      21M Site Kebayoran Lama Utara-004                          36,180,843   33,392,563     3,673,182        884,902        36,180,843

                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
451      18-Jan-24        MANDIRI IDR          1220011559559      Build Kota Bandung - Akses Site - Taman Sukajadi            9,100,750    8,399,400      923,934         222,584         9,100,750
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  90% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Bandung - Akses Site - Taman
452      18-Jan-24        MANDIRI IDR          1220011559559      Pandawa                                                    12,926,198   11,930,040     1,312,304        316,146        12,926,198
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Bandung - Akses Site - Teras
453      18-Jan-24        MANDIRI IDR          1220011559559      Cihampelas                                                  9,907,741    9,144,200     1,005,862        242,321         9,907,741
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Bandung - Akses Site - Teras
454      18-Jan-24        MANDIRI IDR          1220011559559      Cikapundung                                                 8,254,320    7,618,200      838,002         201,882         8,254,320
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
455      18-Jan-24        MANDIRI IDR          1220011559559      Build Pekalongan - Akses Site - Pabean-001                  4,745,730    4,380,000      481,800         116,070         4,745,730
Page 93
                                                                                              Page 30
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN

                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
456      18-Jan-24        MANDIRI IDR          1220011559559      Build Pekalongan - Akses Site - Kradenan-004               6,037,046      5,571,800       612,898         147,652         6,037,046
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Pekalongan - Akses Site - Panjang
457      18-Jan-24        MANDIRI IDR          1220011559559      Baru-001                                                  12,214,296     11,273,000      1,240,030        298,734        12,214,296
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Pekalongan - Akses Site - 2305_HUT
458      18-Jan-24        MANDIRI IDR          1220011559559      Pekalongan (POI XL)                                        8,087,895      7,464,600       821,106         197,811         8,087,895
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
                                                                  Build Kota Pekalongan - Akses Site - 2305_HUT
459      18-Jan-24        MANDIRI IDR          1220011559559      Pekalongan (POI XL) - Protection                          18,233,355     16,828,200      1,851,102        445,947        18,233,355

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
460      18-Jan-24        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 8 Unit               349,872,000    315,200,000     34,672,000             -        349,872,000

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
461      18-Jan-24        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 5 Unit               218,670,000    197,000,000     21,670,000             -        218,670,000

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
462      18-Jan-24        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 5 Unit               218,670,000    197,000,000     21,670,000             -        218,670,000
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Pembuatan Handhole (HH) Concrete
463      19-Jan-24        MANDIRI IDR          1220011559559      Stamp Trotoar Site Tebet Barat-008                        10,677,751      9,773,685      1,075,105        171,039        10,677,751
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Tiang Miring, Kabel Landai
                                                                  dan Pemasangan Accessories Site MP-Sunter
464      19-Jan-24        MANDIRI IDR          1220011559559      Jaya-001                                                   4,668,564      4,273,285       470,061          74,782         4,668,564
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Patroli FO dan Pemasangan
465      19-Jan-24        MANDIRI IDR          1220011559559      Accessories Site MP-Cipulir-002                            7,646,719      6,999,285       769,921         122,487         7,646,719
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO SJUT Jl.Suryo Site
466      19-Jan-24        MANDIRI IDR          1220011559559      MP-Rawa Barat-001                                         31,685,652     29,002,885      3,190,317        507,550        31,685,652
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Restorasi Jalur Permanent Impact
                                                                  Proyek Pelebaran Jalan Site Sukaasih
467      19-Jan-24        MANDIRI IDR          1220011559559      Kab.Tangerang-004                                         24,107,854     22,066,685      2,427,335        386,166        24,107,854
                                                                  MAHAGA PRATAMA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Timur - Akses Site - Relokasi Jl.RA
                                                                  Fadillah (Area Komplek Kopassus Cijantung)-
468      19-Jan-24        MANDIRI IDR          1220011559559      Splicing                                                   9,463,926      8,662,632       952,890         151,596         9,463,926
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
469      19-Jan-24        MANDIRI IDR          1220011559559      15078m                                                 2,103,813,001   1,925,686,957   211,825,565     33,699,521     2,103,813,001
                                                                  BINTANG MAS UTAMA, CV , Biaya Pembelian
                                                                  pengadaan Kabel Power NYAF 4mm
                                                                  Supreme(Red,Black,Green,Yellow)(PO
470      22-Jan-24        SINARMAS IDR          0002999994        Rp.4.195.800,- PPN Rp.415.800,-)                           4,195,800      3,780,000       415,800              -          4,195,800
Page 94
                                                                                              Page 31
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                      NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN

                                                                  KARYA GENERASI BANGSA, PT , Biaya Perbaikan
                                                                  Akses Jalan Site M_348 Ayunan Ambengan (PO
                                                                  Rp.4.446.205,- PPN Rp.440.614,- Potongan PPh
471      22-Jan-24        SINARMAS IDR          0002999994        4(2)4% Rp.160.224,- dari jasa Rp.4.005.590,-)              4,285,980    4,005,590      440,614         160,224         4,285,980

                                                                  KARYA GENERASI BANGSA, PT , Biaya Perbaikan
                                                                  Akses Jalan Site M_68 Gerana (PO Rp.2.851.324,-
                                                                  PPN Rp.282.563,- Potongan PPh 4(2) 4%
472      22-Jan-24        SINARMAS IDR          0002999994        Rp.102.750,- dari jasa Rp.2.568.760,-)                     2,748,573    2,568,760      282,563         102,750         2,748,573

                                                                  KARYA GENERASI BANGSA, PT , Biaya Perbaikan
                                                                  Akses Jalan Site M67 Taman Sangeh (PO
                                                                  Rp.3.345.617,- PPN Rp.331.547,- Potongan PPh
473      22-Jan-24        SINARMAS IDR          0002999994        4(2) 4% Rp.120.563,- dari jasa Rp.3.014.069,- )            3,225,053    3,014,069      331,547         120,563         3,225,053

                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  Pekerjaan lnstalasi Tiang & ME Grounding &
                                                                  Aksesoris Pole Octagonal 21m Site 751226 Kuta-
                                                                  028(PO Rp.30.234.981,- PPN Rp. 2.996.259,-
474      22-Jan-24        MANDIRI IDR          1220011559559      Potongan PPh 4(20 2.65% Rp.721.826,- )                    29,513,155   27,238,722     2,996,259        721,826        29,513,155
                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  Paket Pekerjaan Clvil Work Tiang Pole Octagonal
                                                                  Stell 21m Site 751156.Jimbaran-016 (PO
                                                                  Rp.38.050.502,- PPN Rp.3.770.771,- Potongan
475      22-Jan-24        MANDIRI IDR          1220011559559      PPh 4(2) 2.65% Rp.908.413,- )                             37,142,090   34,279,732     3,770,771        908,413        37,142,090
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Biaya
                                                                  Pekerjaan New Collocation XL (Penambahan
                                                                  Grounding) Site Combat Pecatu-001 (PO
                                                                  Rp.12.376.500,- PPN Rp.1.226.500,- Potongan
476      22-Jan-24        MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.195.125,-)                              12,181,375   11,150,000     1,226,500        195,125        12,181,375

                                                                  SURYA ANUGRAH ENJINERING, PT , Biaya Paket
                                                                  Pekerjaan Delivery dan Erection MBTS Type
                                                                  Moto 23M Site 499512 Combat Tibubeneng_001
                                                                  ( PO Rp.18.315.000,- PPN Rp.1.815.000,-
477      22-Jan-24        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 4% Rp.660.000,- )                       17,655,000   16,500,000     1,815,000        660,000        17,655,000

                                                                  SURYA ANUGRAH ENJINERING, PT , Biaya Paket
                                                                  Pekerjaan Delivery dan Erection MBTS Type
                                                                  Moto 23M Site 499507 Combat Pecatu_001 ( PO
                                                                  Rp.18.315.000,- PPN Rp.1.815.000,- Potongan
478      22-Jan-24        MANDIRI IDR          1220011559559      PPh 4(2) 4% Rp.660.000,- )                                17,655,000   16,500,000     1,815,000        660,000        17,655,000
                                                                  SURYA ANUGRAH ENJINERING, PT , Biaya Paket
                                                                  Pekerjaan Delivery dan Erection MBTS Type
                                                                  Moto 23M Site 499505 Combat Kerobokan
                                                                  Kaja_001 ( PO Rp.11.100.000,- PPN
                                                                  Rp.1.100.000,- Potongan PPh 4(2) 4%
479      22-Jan-24        MANDIRI IDR          1220011559559      Rp.400.000,- )                                            10,700,000   10,000,000     1,100,000        400,000        10,700,000
                                                                  DUTA CIPTA SARANA, PT , Paket Pekerjaan Civil
                                                                  Work Tiang Pole Octagonal Stell 21m Site
                                                                  751168 Tumbak Bayuh_003(PO Rp. 28.275.769,-
                                                                  PPN Rp.2.802.103,- Potongan PPh 4(2) 1.75%
480      22-Jan-24        MANDIRI IDR          1220011559559      Rp.27.829.980,- )                                         27,829,980   25,473,666     2,802,103        445,789        27,829,980
                                                                  KESA UTAMA SEJAHTERA, PT , Paket Pekerjaan
                                                                  Perkuatan MP30 (Tenant lndosat) Site M 47
                                                                  Taman Jimbaran (PO Rp.97.113.182,-PPN
                                                                  Rp.9.623.828,- Potongan PPh 4(2) 1.75%
481      22-Jan-24        MANDIRI IDR          1220011559559      Rp.1.531.064,- )                                          95,582,117   87,489,353     9,623,828      1,531,064        95,582,117
Page 95
                                                                                               Page 32
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                           NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  RAJA AMERTHA DEWATA, PT , Tagihan 90%
                                                                  Pekerjaan Relokasi SJUT-Jalur FO Simpang Siligita
                                                                  - Kempinski - SPK No. : 062/BTS/SCM-
                                                                  PROC/SPK/VIII/2022] (PO Rp.146.485.588,- PPN
                                                                  Rp.13.064.930,- Potongan PPh 4(2) 1.75%
482      22-Jan-24        MANDIRI IDR          1220011559559      Rp.2.078.512,- )                                           129,758,516    118,772,098     13,064,930      2,078,512       129,758,516
                                                                  RAJA AMERTHA DEWATA, PT , Pekerjaan
                                                                  Penarikan Kabel Udara 24 Core- FO Link Akses to
                                                                  Site_33 Sawangan(PO Rp.16.843.870,- PPN
                                                                  Rp.1.669.212,- Potongan PPh 4(2) 1.75%
483      22-Jan-24        MANDIRI IDR          1220011559559      Rp.265.557,-)                                               16,578,313     15,174,658      1,669,212        265,557        16,578,313

                                                                  NOKIA SOLUTIONS and NETWORK INDONESIA,
                                                                  PT , Tagihan Pelunasan 90% atas Pengadaan
                                                                  Switch Nokiaa 7210 MXP Chasis SAS-MXP
                                                                  22F2C4SFP+ETR-48VDC sebanya 29unit dan PS
                                                                  SAS-T/MXP ETR-48V 200W DC sebanyak 21unit
484      22-Jan-24        VICTORIA IDR          0880003577        (Pelunasan oleh SKBDN No.131SKBDN/III/23)                  447,645,991    403,284,677     44,361,314             -        447,645,991
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
485      23-Jan-24        MANDIRI IDR          1220011559559      15096m                                                   2,123,126,806   1,943,365,497   213,770,205     34,008,896     2,123,126,806

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
486      24-Jan-24        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 9 Unit                 393,606,000    354,600,000     39,006,000             -        393,606,000
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 27U V3.0 2 Door sebanyak 6Pcs,
                                                                  ODC 27U V2.1 1 Door sebanyak 6Pcs, Electrical
                                                                  sebanyak 6 Set, ODC 27U & 15U Bracket Frame
                                                                  sebanyak 15Pcs, Bracket Longdrat sebanyak
487      24-Jan-24        MANDIRI IDR          1220011559559      36Pcs                                                      200,023,110    180,201,000     19,822,110             -        200,023,110

                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door Rack, ODC 64U
488      24-Jan-24        MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 3 Unit                 131,202,000    118,200,000     13,002,000             -        131,202,000
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan Panel Box KWH 1 Phase H 525MM L
                                                                  310MM W 285MM sebanyak 30 Unit, Panel Box
                                                                  KWH 3 Phase H 700MM L 310MM W 285MM
489      24-Jan-24        MANDIRI IDR          1220011559559      sebanyak 20 Unit                                            36,831,232     33,181,290      3,649,942             -         36,831,232
                                                                  DUTA HITA JAYA, PT , DP 30% atas Steel Pole
490      25-Jan-24        MANDIRI IDR          1220011559559      21M sebanyak 10 Set - PPN                                   36,921,545             -      36,921,545             -         36,921,545
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Anchor sebanyak 72 Pcs dan
491      25-Jan-24        MANDIRI IDR          1220011559559      Plate Setting sebanyak 18 Pcs - PPN                          1,235,417             -       1,235,417             -          1,235,417
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Anchor sebanyak 16 Pcs dan
492      25-Jan-24        MANDIRI IDR          1220011559559      Plate Setting sebanyak 4 Pcs - PPN                            274,552              -        274,552              -           274,552
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan MP 30M Light sebanyak 2 Set -
493      25-Jan-24        MANDIRI IDR          1220011559559      PPN                                                         22,242,064             -      22,242,064             -         22,242,064
                                                                  ARALIA ARTHA MANDIRI, CV , Pembelian CPU 24
                                                                  Core 5.8 GHZ 36MB Cache 125W Sebanyak 5 Pcs,
494      25-Jan-24        MANDIRI IDR          1220011559559      VGA GDDR6 16 Gb Sebanyak 5 Unit, dll                       176,475,021    158,986,505     17,488,516             -        176,475,021
                                                                  BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                                  100% Paket Pekerjaan FO Network Optimization
495      25-Jan-24        MANDIRI IDR          1220011559559      17.816m                                                  2,307,049,831   2,111,716,092   232,288,770     36,955,031     2,307,049,831
Page 96
                                                                                              Page 33
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                             NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK      DPP              PPN             PPh         NET DIBAYARKAN

                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1204-004 FO
                                                                  Link DPS_02 to Sukawati_002 & Kertalangu_005
                                                                  Jl. WR Supratman Denpasar).(PO Rp.1.517.700,-
496      26-Jan-24        SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.45.531,-                              1,472,169      1,517,700               -          45,531         1,472,169
                                                                  POLA REKAYASA UTAMA, PT , Jasa Analisa
                                                                  Kapasitas Pole, Analisa Kapasitas Pondasi,
                                                                  Analisa Perkuatan Pole dan Analisa Perkuatan
                                                                  Pondasi site M_18 Pipitan Dalung Selatan MP
497      26-Jan-24        MANDIRI IDR          1220011559559      30m                                                          7,875,000      7,500,000          825,000        450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
498      26-Jan-24        MANDIRI IDR          1220011559559      Pondasi site M_208 Pelita MP 20m                             7,875,000      7,500,000          825,000        450,000         7,875,000
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test dan
499      26-Jan-24        MANDIRI IDR          1220011559559      Analisa Pondasi site Dalung-007                              4,837,500      4,500,000          495,000        157,500         4,837,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test dan
500      26-Jan-24        MANDIRI IDR          1220011559559      Analisa Pondasi site Sading-002                              5,912,500      5,500,000          605,000        192,500         5,912,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test dan
501      26-Jan-24        MANDIRI IDR          1220011559559      Analisa Pondasi site Jimbaran-019                            5,912,500      5,500,000          605,000        192,500         5,912,500
                                                                  HANDASA KONSULTAN, PT , Jasa Soil Test site
502      26-Jan-24        MANDIRI IDR          1220011559559      Lebak Bulus-019                                              4,300,000      4,000,000          440,000        140,000         4,300,000
                                                                  ZTE INDONESIA, PT , DP 10% atas Pengadaan
                                                                  Battery Lithium 48V 100AH ZXDC48 FB100B3 ZTE
503      26-Jan-24        MANDIRI IDR          1220011559559      Batch 5 sebanyak 1.000 Unit                              1,828,593,000   1,828,593,000              -              -      1,828,593,000
                                                                  ZTE INDONESIA, PT , DP 10% atas Pengadaan
                                                                  Battery Lithium 48V 100AH ZXDC48 FB100B3 ZTE
504      26-Jan-24        MANDIRI IDR          1220011559559      Batch 5 sebanyak 1.000 Unit - PPN                          201,145,230             -       201,145,230             -        201,145,230

                                                                  ZTE INDONESIA, PT , Tagihan Pelunasan 90% atas
                                                                  Pengadaan Battery Lithium 48V 100AH ZXDC48
505      26-Jan-24        MANDIRI IDR          1220011559559      FB100B3 ZTE Batch 3 sebanyak 1.000 Unit                  8,497,872,045   7,655,740,581   842,131,463.92            -      8,497,872,045
                                                                  PUTRA NEGARA, PT , Tagihan Term II 50% atas
                                                                  Biaya Paket Pekerjaan Perbaikan RAK Kabinet
506      30-Jan-24        MANDIRI IDR          1220011559559      (RK) 7 Ways Surabaya                                        22,927,425     21,427,500         2,357,025       857,100        22,927,425
                                                                  KARYA GENERASI BANGSA, PT , Biaya Perbaikan
                                                                  Akses Jalan Site M_53 Tumbak Bayuh (PO
                                                                  Rp.11.043.272,- PPN Rp.1.094.378,- Potongan
                                                                  PPh 4(2) 4% Rp.397.956,- dari jasa Rp.9.948.894,-
507      1-Feb-24         MANDIRI IDR          1220011559559      )                                                           10,645,316      9,948,894         1,094,378       397,956        10,645,316
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Pekerjaan
                                                                  Instalasi Monopole Octagonal 26m (ME
                                                                  Grounding Accessories) Site 751150 Mekar
                                                                  Bhuana _002(PO Rp.40.710.601,- PPN
                                                                  Rp.4.034.383,- Potongan PPh 4(2) 1.75%
508      1-Feb-24         MANDIRI IDR          1220011559559      Rp.641.834,- )                                              40,068,766     36,676,217         4,034,383       641,834        40,068,766
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Pekerjaan
                                                                  Civil Work Tiang Baja Monopole Octagonal 26m
                                                                  Site 751150 Mekar Bhuana _002(PO
                                                                  Rp.61.517.434,- PPN Rp.6.096.322,- Potongan
509      1-Feb-24         MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.969.869,- )                               60,547,565     55,421,112         6,096,322       969,869        60,547,565
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Pekerjaan
                                                                  Civil Work Tiang Pole Octagonal Stell 21m Site
                                                                  751213 Tuban_010 (PO Rp.34.404.164,- PPN
                                                                  Rp.3.409.421,- Potongan PPh 4(2) 1.75%
510      1-Feb-24         MANDIRI IDR          1220011559559      Rp.542.408,-)                                               33,861,755     30,994,742         3,409,421       542,408        33,861,755
                                                                  DUTA CIPTA SARANA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Monopole Oktagonal 26 M
511      1-Feb-24         MANDIRI IDR          1220011559559      Site Baha-001                                               40,068,768     36,676,218         4,034,383       641,833        40,068,768
Page 97
                                                                                               Page 34
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  DUTA CIPTA SARANA, PT , Paket Pekerjaan Civil
                                                                  Work Tiang Pole Octagonal Stell 21m Site
                                                                  751200 Kerobokan Kelod-025 (PO
                                                                  Rp.25.967.049,- PPN Rp.2.573.311,- Potongan
512      1-Feb-24         MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.409.390,- )                              25,557,659    23,393,738     2,573,311        409,390        25,557,659
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Biaya
                                                                  Paket Pekerjaan Civil Work Tiang Pole Octagonal
                                                                  Stell 30m Site 751224 Kuta_027 (PO
                                                                  Rp.25.967.049,- PPN Rp.2.573.311,- Potongan
513      1-Feb-24         MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.409.390,- )                              25,557,659    23,393,738     2,573,311        409,390        25,557,659
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Biaya
                                                                  Paket Pekerjaan Civil Work Monopole Octagonal
                                                                  26m Site 751187 Jimbaran-019 (PO
                                                                  Rp.56.406.191,- PPN Rp.5.589.803,- Potongan
514      1-Feb-24         MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.889.287,- )                              55,516,904    50,816,388     5,589,803        889,287        55,516,904
                                                                  TELCO ABADI JAYA, PT , Pembelian Cable NYAF
                                                                  10MM Supreme - RED 2.500M, Cable NYAF
                                                                  10MM Supreme - Black 3.000M, Cable NYAF
515      1-Feb-24         MANDIRI IDR          1220011559559      10MM Supreme - Yellow 2.000M                              192,723,750   173,625,000    19,098,750             -        192,723,750

                                                                  ALIANSI INOVASI GLOBAL, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
516      1-Feb-24         MANDIRI IDR          1220011559559      Jakarta Utara - Akses Site - Kamal Muara-035                7,996,318     7,319,284      805,121         128,087         7,996,318
                                                                  ALIANSI INOVASI GLOBAL, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Kabel FO Final as Build
517      1-Feb-24         MANDIRI IDR          1220011559559      Jakarta Pusat - Akses Site - Karang Anyar-004               8,871,192     8,120,084      893,209         142,101         8,871,192
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
518      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
519      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
520      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
521      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
522      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
523      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
524      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
525      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
526      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
527      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
528      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                       2,384,375     2,187,500      240,625          43,750         2,384,375
Page 98
                                                                                              Page 35
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                      NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
529      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                      2,384,375    2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
530      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                      1,907,500    1,750,000      192,500          35,000         1,907,500
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
531      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                      2,384,375    2,187,500      240,625          43,750         2,384,375
                                                                  CIPTA SEDAYU ELEKTRINDO, PT , Tagihan 100%
                                                                  atas Paket Pekerjaan Pengadaan Sertifikat Laik
532      1-Feb-24         MANDIRI IDR          1220011559559      Operasi (SLO) 10 Site                                      2,384,375    2,187,500      240,625          43,750         2,384,375
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN Project
                                                                  Pekerjaan CCTV Jakarta 204 Site by Cash
533      2-Feb-24         MANDIRI IDR          1220011559559      Advance - Trf                                             44,066,500   44,066,500          -                -         44,066,500
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr Crossing Road
                                                                  dan Penarikan Kabel FO Site MP-Pondok Kopi-
534      2-Feb-24         MANDIRI IDR          1220011559559      001                                                        6,759,923    6,317,685      694,945         252,707         6,759,923

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr Crossing Road
535      2-Feb-24         MANDIRI IDR          1220011559559      Site MP-Kelapa Gading Barat-001                            6,812,353    6,366,685      700,335         254,667         6,812,353
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr Crossing Road
536      2-Feb-24         MANDIRI IDR          1220011559559      Site MP-Jagakarsa-001                                      5,597,903    5,231,685      575,485         209,267         5,597,903
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr Crossing Road
                                                                  dan Pemasangan Accessories Site MP-Cipete
537      2-Feb-24         MANDIRI IDR          1220011559559      Utara-001                                                  5,188,093    4,848,685      533,355         193,947         5,188,093
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan PenarikanFO Cut Ducting Impact
                                                                  Proyek Saluran Air Site Sukaasih Kab.Tangerang-
538      2-Feb-24         MANDIRI IDR          1220011559559      004                                                        2,002,703    1,871,685      205,885          74,867         2,002,703
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive Penarikan Kabel Jaringan
539      2-Feb-24         MANDIRI IDR          1220011559559      PLN Site Senayan-002                                       9,596,493    8,968,685      986,555         358,747         9,596,493

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr dan Perbaikan
540      2-Feb-24         MANDIRI IDR          1220011559559      Kabel FO Crossing Road Site Jatinegara-010                 3,519,963    3,289,685      361,865         131,587         3,519,963
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Komplen Binamarga Jakarta
                                                                  Barat dan Pemasangan Tiang FO 9mtr site MP-
541      2-Feb-24         MANDIRI IDR          1220011559559      Kapuk-003                                                  5,011,543    4,683,685      515,205         187,347         5,011,543

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr dan Perbaikan
542      2-Feb-24         MANDIRI IDR          1220011559559      Kabel FO Crossing Road Site Jatinegara-005                 3,311,313    3,094,685      340,415         123,787         3,311,313

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan CRM HDPE Expose, Kabel
543      2-Feb-24         MANDIRI IDR          1220011559559      Landai & Tiang Miring Site MP-Sunter Agung-001             3,328,433    3,110,685      342,175         124,427         3,328,433

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr dan Perbaikan
544      2-Feb-24         MANDIRI IDR          1220011559559      Kabel FO Crossing Road Site Jatisampurna-010               3,907,303    3,651,685      401,685         146,067         3,907,303
Page 99
                                                                                               Page 36
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                     NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr dan Perbaikan
545      2-Feb-24         MANDIRI IDR          1220011559559      Kabel FO Crossing Road Site MP-Tegal Alur-001                 6,151,093     5,748,685      632,355         229,947         6,151,093

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr dan Perbaikan
546      2-Feb-24         MANDIRI IDR          1220011559559      Kabel FO Crossing Road Site Aren Jaya-015                     3,287,773     3,072,685      337,995         122,907         3,287,773
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Ducting Impact
547      2-Feb-24         MANDIRI IDR          1220011559559      HDPE Site Kapuk Muara-047                                     3,671,903     3,431,685      377,485         137,267         3,671,903
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Tiang FO dan Perapihan
548      2-Feb-24         MANDIRI IDR          1220011559559      Kabel FO Landai Site Ancol-016                                4,195,133     3,920,685      431,275         156,827         4,195,133

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Ducting Impact
549      2-Feb-24         MANDIRI IDR          1220011559559      HDPE Terbakar Site Kelapa Gading Timur-005                    3,628,033     3,390,685      372,975         135,627         3,628,033
                                                                  AREA KOTA PEKALONGAN , Uang Muka Beban
                                                                  Umum atas Pelunasan Biaya Sewa Lahan Site
                                                                  Kauman Pekalongan-002/ 421001 Priority XL -
                                                                  Kota Pekalongan Selama 15 tahun -
550      5-Feb-24         MANDIRI IDR          1220011559559      PR:1010036859-Trf                                           205,200,000   205,200,000           -               -        205,200,000
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN Project
                                                                  Pekerjaan CCTV Jakarta 204 Site by Cash
551      6-Feb-24         MANDIRI IDR          1220011559559      Advance - Trf                                                55,438,500    55,438,500           -               -         55,438,500
                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1218- 007 FO
                                                                  Link M_58 to Site_10 Jln. Raya Uluwatu, Pecatu
                                                                  Badung (PO Rp.2.367.600,- Potongan PPh 21(3%)
552      7-Feb-24         SINARMAS IDR          0002999994        Rp.71.028,-)                                                  2,296,572     2,367,600           -           71,028         2,296,572

                                                                  IMAM TAUFIK , Biaya Perbaikan FO cut TT.I1215-
                                                                  017 FO Link BLL_08 to BLL_16 Jl. Jelantik Gingsir,
                                                                  Singaraja Buleleng(PO Rp.3.239.900,- Potongan
553      7-Feb-24         SINARMAS IDR          0002999994        PPh 21(3%) Rp.97.197,-)                                       3,142,703     3,239,900           -           97,197         3,142,703
                                                                  IMAM TAUFIK , Biaya Perbaikan FO cut TT.I1214-
                                                                  002 FO Link BLL_16 to BLL_08 Jl. Bedugul
                                                                  Singaraja, Pegayaman,Buleleng (PO
                                                                  Rp.3.347.600,- Potongan PPh 21(3%)
554      7-Feb-24         SINARMAS IDR          0002999994        Rp.100.428,-)                                                 3,247,172     3,347,600           -          100,428         3,247,172

                                                                  IMAM TAUFIK , Biaya Perbaikan FO Cut TT.I1210-
                                                                  005 FO Link DPS_10 dan MCP Denpasar Sec I Jln.
                                                                  Raya Puputan Renon Denpasar(PO Rp.5.287.100,-
555      7-Feb-24         SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.158.613,-                              5,128,487     5,287,100           -          158,613         5,128,487
                                                                  PLN PERSERO, PT , Biaya Upgrade Daya PLN site
                                                                  Sibang Kaja 004 menjadi daya 16500 KWH dan
556      12-Feb-24        SINARMAS IDR          0002999994        Biaya Admin Rp.5.000,-                                       11,264,700    11,264,700           -               -         11,264,700
                                                                  AREA BADUNG , Pengajuan Biaya Budget Ijin
                                                                  Warga Untuk Warga Penyanding dan Kontribusi
                                                                  Banjar Site 211252 Jimbaran-030 (PO
                                                                  Rp.8.092.783,- Potongan PPh 21(3%) Rp.92.783,-
557      12-Feb-24        SINARMAS IDR          0002999994        )                                                             8,000,000     8,000,000           -               -          8,000,000
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Ring Mounting Bracket MP 30M
558      12-Feb-24        MANDIRI IDR          1220011559559      sebanyak 4 Set                                               18,204,000    16,400,000     1,804,000             -         18,204,000
Page 100
                                                                                             Page 37
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW under site_13
                                                                  Pecatu -Dismantle MW Link Site_13 Pecatu to
                                                                  site_41 Ritz Carlton (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
559      12-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                               4,441,013     4,065,000      447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW under site_13
                                                                  Pecatu -Dismantle MW Link Site_13 Pecatu to
                                                                  site_16 GWK (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
560      12-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                               4,441,013     4,065,000      447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW under site_13
                                                                  Pecatu -Dismantle MW Link Site_13 Pecatu to
                                                                  site_10 Pura Selonding (2+0) (PO Rp.4.512.150,-
                                                                  PPN Rp.447.150,- Potongan PPh 4(2) 1.75%
561      12-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                               4,441,013     4,065,000      447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW under site_13
                                                                  Pecatu -Dismantle MW Link Site_13 Pecatu to
                                                                  M_43 Temu Dewi (2+0) (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
562      12-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                               4,441,013     4,065,000      447,150          71,138         4,441,013
                                                                  BIBIT , Biaya Perbaikan FO cut TT.I1226- 007 FO
                                                                  Link Redundant S04 to S06 dan S07-Jln. Pratama -
                                                                  Nusa dua Badung (PO Rp.1.994.100,- Potongan
563      12-Feb-24        SINARMAS IDR          0002999994        PPh 21(3%) Rp.59.823,- )                                   1,934,277     1,994,100          -            59,823         1,934,277
                                                                  IMAM TAUFIK , Biaya Pekerjaan Perbaikan FO
                                                                  Cut TT.I12221-013 Link Aksess DPS_33 Raya Noja
                                                                  Denpasar (PO Rp.2.161.600,- Potongan PPh
564      12-Feb-24        SINARMAS IDR          0002999994        21(3%) Rp.64.848,- )                                       2,096,752     2,161,600          -            64,848         2,096,752
                                                                  BIBIT , Biaya Relokasi Pole P7_178 FO link BLL_08
                                                                  to BLL_01 Jl. Seririt Singaraja, Pemaron Buleleng
                                                                  (PO Rp.1.774.396,- Potongan PPh 21(3%)
565      12-Feb-24        SINARMAS IDR          0002999994        Rp.53.232,- )                                              1,721,164     1,774,396          -            53,232         1,721,164
                                                                  IMAM TAUFIK , Biaya Pekerjaan Perbaikan FO
                                                                  Cut TT.I1229-008 link S31 to S32 Jl Rampai Baha
                                                                  Mengwi (PO Rp.1.554.100,- Potongan PPh
566      12-Feb-24        SINARMAS IDR          0002999994        21(3%) Rp.46.623,-)                                        1,507,477     1,554,100          -            46,623         1,507,477
                                                                  BIBIT , Biaya Pekerjaan Perbaikan Fo Cut
                                                                  TT.I1222-014 Relokasi Fo GNY_04 to
                                                                  Sukawati_002 Jl Raya Ubud Gianyar(PO
                                                                  Rp.2.206.500,- Potongan PPh 21(3%) Rp.66.195,-
567      12-Feb-24        SINARMAS IDR          0002999994        )                                                          2,140,305     2,206,500          -            66,195         2,140,305
                                                                  AREA BADUNG , Akuisisi Site 211252 Jimbaran-
                                                                  030 seluas 9m2, jangka waktu 10 tahun periode
                                                                  2024-2034(PO Rp.240.000.000,- Potongan PPh
568      15-Feb-24        MANDIRI IDR          1220011559559      4(2) 10% Rp.24.000.000,- )                               216,000,000   216,000,000          -                -        216,000,000
                                                                  AREA BADUNG , Akuisisi Site 211253
                                                                  Sedang_001 seluas 9m2, jangka waktu 10 tahun
                                                                  periode 2024-2034(PO Rp.177.777.777,-
569      15-Feb-24        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 10% Rp.17.777.777,-                    160,000,000   160,000,000          -                -        160,000,000
                                                                  AREA KAB TANGERANG , Uang Muka Beban
                                                                  Umum atas Biaya Pelunasan Sewa Lahan Site
                                                                  Panongan-002/ 707184 Priroity XL - Kab.
570      15-Feb-24        MANDIRI IDR          1220011559559      Tangerang Selama 15 tahun                                115,500,000   115,500,000          -                -        115,500,000
Page 101
                                                                                              Page 38
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Pole Fiber Optic Round 9M
571      16-Feb-24        MANDIRI IDR          1220011559559      sebanyak 140 Unit                                        279,720,000   252,000,000    27,720,000             -        279,720,000
                                                                  ASIA TELCO NETWORKS, PT , Pembelian Modular
                                                                  DC XL 3 System MCB Schneider As BTS Deisgn
572      16-Feb-24        MANDIRI IDR          1220011559559      V.02/2016 Sebanyak 50 Set                                514,762,500   463,750,000    51,012,500             -        514,762,500
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 27U V3.0 2 Door sebanyak 9Pcs,
                                                                  ODC 27U V2.1 1 Door sebanyak 9Pcs, Electrical
                                                                  sebanyak 9 Set, ODC 27U & 15U Bracket Frame
                                                                  sebanyak 18Pcs, Bracket Longdrat sebanyak
573      16-Feb-24        MANDIRI IDR          1220011559559      54Pcs                                                    300,034,665   270,301,500    29,733,165             -        300,034,665
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN Project
                                                                  Pekerjaan CCTV Jakarta 204 Site by Cash
574      16-Feb-24        MANDIRI IDR          1220011559559      Advance - Trf                                             28,430,000    28,430,000           -               -         28,430,000

                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Tower Pole 6M Type 3
575      16-Feb-24        MANDIRI IDR          1220011559559      site Kauman Pekalongan-002 sebanyak 1 Lot                 57,442,500    51,750,000     5,692,500             -         57,442,500
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
576      16-Feb-24        MANDIRI IDR          1220011559559      Additional Bordes Panel 27U sebanyak 1 Set                 3,496,617     3,496,617           -               -          3,496,617
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Plate Setting sebanyak 30Pcs
577      16-Feb-24        MANDIRI IDR          1220011559559      dan Anchor sebanyak 240Pcs - PPN                           4,278,351           -       4,278,351             -          4,278,351
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan MCP Pole 21M sebanyak 5 Unit
578      16-Feb-24        MANDIRI IDR          1220011559559      (Project Bali) - PPN                                      41,649,018           -      41,649,018             -         41,649,018
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
                                                                  Camouflage Clamp sebanyak 2.500Pcs dan Nut
579      16-Feb-24        MANDIRI IDR          1220011559559      Bolt sebanyak 2.500Pcs - PPN                               7,077,922           -       7,077,922             -          7,077,922

                                                                  JARING INFRASTRUKTUR NASIONAL, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan Kabel FO Final as
580      19-Feb-24        MANDIRI IDR          1220011559559      Build Jakarta Barat - Akses Site - Kamal-003               5,711,590     5,228,000      575,080          91,490         5,711,590
                                                                  YUYUN MUNADHI , Tagihan 100% atas Pekerjaan
                                                                  Perbaikan Jalur FO Cut site Ngemplaksimongan-
581      19-Feb-24        MANDIRI IDR          1220011559559      002                                                        2,059,407     2,112,212           -           52,805         2,059,407

                                                                  YUYUN MUNADHI , Tagihan 100% atas Pekerjaan
582      19-Feb-24        MANDIRI IDR          1220011559559      Perbaikan Jalur FO Cut site Veteran MP                     3,022,255     3,099,748           -           77,493         3,022,255

                                                                  YUYUN MUNADHI , Tagihan 100% atas Pekerjaan
583      19-Feb-24        MANDIRI IDR          1220011559559      Pemindahan Tiang FO site Panjang Baru-001                  2,919,685     2,994,548           -           74,863         2,919,685

                                                                  ADIKA MANGGALA PRIMA, PT , Tagihan 100%
                                                                  atas Relokasi 1 Pekerjaan Civil Work Telematika
584      19-Feb-24        MANDIRI IDR          1220011559559      Tiang Beton 14/900 Site Lebak Bulus-018                   19,704,683    18,036,323     1,983,995        315,635        19,704,683

                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan Kontribusi Banjar
                                                                  Site 211253 Sedang_001 (PO Rp.22.371.132,-
585      20-Feb-24        SINARMAS IDR          0002999994        Potongan PPh 21(3%) Rp.371.132,-)                         22,000,000    22,000,000           -               -         22,000,000

                                                                  PLN PERSERO, PT , Biaya Pembelian Token PLN
                                                                  untuk sambungan baru (permanen) Site
586      20-Feb-24        SINARMAS IDR          0002999994        Padangsambian-001 dan Biaya Admin Rp.2.500,-               5,002,500     5,002,500           -               -          5,002,500
Page 102
                                                                                             Page 39
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN Project
                                                                  Pekerjaan CCTV Jakarta 204 Site by Cash
587      20-Feb-24        MANDIRI IDR          1220011559559      Advance - Trf                                            25,587,000     25,587,000            -               -         25,587,000
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW under site_13
                                                                  Pecatu -Dismantle MW Link Site_13 Pecatu to
                                                                  M_89 Langui Kangin (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
588      20-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                              4,441,013      4,065,000       447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW under site_13
                                                                  Pecatu -Dismantle MW Link Site_13 Pecatu to
                                                                  M_126 Mahagiri (2+0) (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
589      20-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                              4,441,013      4,065,000       447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW BSC Telkomsel -
                                                                  Dismantle MW Link Site_26 Tangeb to TAB033
                                                                  BSC Tsel Tabanan (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
590      20-Feb-24        SINARMAS IDR          0002999994        Rp.71.137,50,-                                            4,441,013      4,065,000       447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW BSC Telkomsel -
                                                                  Dismantle MW Link Site_27 Beringkit to TAB033
                                                                  BSC Tsel Tabanan (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
591      20-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                              4,441,013      4,065,000       447,150          71,138         4,441,013
                                                                  SENTRA INDO TELEMEDIA, PT , Tagihan 100%
                                                                  atas Pekerjaan Relokasi Jl. Palatehan, Jakarta
                                                                  Selatan Impact Penataan Jaringan Utilitas Site
592      20-Feb-24        MANDIRI IDR          1220011559559      Melawai-002                                              83,306,806     76,253,369      8,387,870      1,334,433        83,306,806
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW BSC Telkomsel -
                                                                  Dismantle MW Link Site BLL_08 Beratan to
                                                                  SGR072 BSC Tsel Singaraja (2+0) (PO
                                                                  Rp.4.512.150,- PPN Rp.447.150,- Potongan PPh
593      21-Feb-24        SINARMAS IDR          0002999994        4(2) 1.75% Rp.71.137.50                                   4,441,013      4,065,000       447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW BSC Telkomsel -
                                                                  Dismantle MW Link Site_18 Muding Kaja to
                                                                  DPR500 TTC Tsel Renon (PO Rp.4.512.150,- PPN
                                                                  Rp.447.150,- Potongan PPh 4(2) 1.75%
594      21-Feb-24        SINARMAS IDR          0002999994        Rp.71.137.50                                              4,441,013      4,065,000       447,150          71,138         4,441,013
                                                                  ALIANSI INOVASI GLOBAL, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Link MW BSC Telkomsel -
                                                                  Dismantle MW Link Site BLL_08 Beratan to
                                                                  SGR072 BSC Tsel Singaraja (4+0) (PO
                                                                  Rp.4.512.150,- PPN Rp.447.150,- Potongan PPh
595      21-Feb-24        SINARMAS IDR          0002999994        4(2) 1.75% Rp.71.137.50                                   4,441,013      4,065,000       447,150          71,138         4,441,013
                                                                  BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                                  100% Paket Pekerjaan FO Network Optimization
596      22-Feb-24        MANDIRI IDR          1220011559559      17539m                                                2,305,359,097   2,110,168,510   232,118,535     36,927,948     2,305,359,097
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
597      23-Feb-24        MANDIRI IDR          1220011559559      15.734m                                               2,171,672,085   1,987,800,535   218,658,059     34,786,509     2,171,672,085
Page 103
                                                                                              Page 40
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                     NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Pekerjaan Dismantle Tiang & ME
                                                                  Grounding & Accessories Monopole 26 M Site
598      23-Feb-24        MANDIRI IDR          1220011559559      Padasuka-007                                            14,565,254    13,332,040     1,466,524        233,310        14,565,254
                                                                  AREA BADUNG , Biaya Kompensasi Penggunaan
                                                                  Lahan Untuk Pembangunan Senderan/Perkuatan
                                                                  Tanah Akibat Longsor di Site M_64 Sayan
                                                                  Delodan.(PO Rp.55.555.555,- Potongan PPh 4(2)
599      26-Feb-24        SINARMAS IDR          0002999994        10% Rp.5.555.555,- )                                    50,000,000    50,000,000           -               -         50,000,000
                                                                  BERANI INOVASI INDONESIA, PT , Tagihan 100%
                                                                  atas Pekerjaan Additional ME Grounding &
                                                                  Accessories Telematika 14/900 Site Kamal Muara-
600      26-Feb-24        MANDIRI IDR          1220011559559      031                                                      3,602,361     3,700,422           -           98,061         3,602,361
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN Project
                                                                  Pekerjaan CCTV Jakarta 204 Site by Cash
601      27-Feb-24        MANDIRI IDR          1220011559559      Advance - Trf                                           14,215,000    14,215,000           -               -         14,215,000
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan MP 30M Light Batch 2 sebanyak
602      29-Feb-24        MANDIRI IDR          1220011559559      3 Set                                                  307,044,780   307,044,780           -               -        307,044,780
                                                                  DUTA HITA JAYA, PT , Tagihan Pelunasan 70%
                                                                  atas Pengadaan Pengadaan Material 2nd Bordes
603      29-Feb-24        MANDIRI IDR          1220011559559      MCP 21M sebanyak 30 Set                                 38,622,675    38,622,675           -               -         38,622,675
                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Tagihan
                                                                  100% atas Paket Pekerjaan Perkuatan MP30 -
604      1-Mar-24         MANDIRI IDR          1220011559559      Site M_62 Goa Gong                                      87,333,971    80,603,572     8,866,393      2,135,994        87,333,971

                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Baja
605      1-Mar-24         MANDIRI IDR          1220011559559      Monopole Octagonal 26 M Site Abiansemal-001            70,806,768     65,350,040     7,188,504      1,731,776        70,806,768
                                                                  MANNA ABADI SEJAHTERA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Barat - Akses Site - Relokasi Jalan Pos
606      1-Mar-24         MANDIRI IDR          1220011559559      Pengumben                                             177,248,443    162,241,137    17,846,525      2,839,219       177,248,443
                                                                  SYMMETRY CONTRACTING INDONESIA, PT ,
                                                                  Tagihan 100% atas Pekerjaan Penarikan Kabel FO
                                                                  as Build Jakarta Selatan - Akses Site - MP-
607      1-Mar-24         MANDIRI IDR          1220011559559      Ragunan-001                                            27,896,875     25,747,000     2,832,170        682,295        27,896,875
                                                                  CELLULAR OPERATION SUPPORT , Uang Muka
                                                                  Beban Umum atas 315_FPU Biaya Upgrade Daya
                                                                  KWH 16500 To 23000 Pascabayar Site 707145
608      1-Mar-24         MANDIRI IDR          1220011559559      Suka Damai-006 - Trf                                    7,387,000      7,387,000           -               -          7,387,000
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Tiang Baja -
609      4-Mar-24         MANDIRI IDR          1220011559559      Monopole Octagonal 26 M Site Benoa-016                 60,048,775     55,421,112     6,096,322      1,468,659        60,048,775
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Paket Pekerjaan Perkuatan MP30 -
610      4-Mar-24         MANDIRI IDR          1220011559559      Site M_61 Panji Dalung                                 85,487,143     78,899,070     8,678,898      2,090,825        85,487,143
                                                                  PUTERATEL ANDALAN SUKSES, PT , Pembelian
                                                                  OTB Indoor 24 Core SC/UPC Full Set Sebanyak 15
                                                                  Unit, OTB Indoor 48 Core SC/UPC Full Set
611      4-Mar-24         MANDIRI IDR          1220011559559      Sebanyak 3 Unit                                        13,486,500     12,150,000     1,336,500             -         13,486,500
                                                                  BINTANG MAS UTAMA, CV , Biaya Pengadaan
                                                                  Barang Connector RJ45 Cat 5e Belden dan RJ45
                                                                  Cat 6 Belden,Kabel Power NYAF 4mm Black
                                                                  Supreme,Green Yellow Supreme,Green Black
                                                                  Supreme,6. Schoen BC Aluminium Insulated Y
612      4-Mar-24         MANDIRI IDR          1220011559559      4mm Red, Yellow dan Black                              34,499,910     31,081,000     3,418,910             -         34,499,910
Page 104
                                                                                               Page 41
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  BINTANG MAS UTAMA, CV , Biaya Pembelian
                                                                  Climbing Safety Helmet,Kyoritsu Digital
                                                                  Grounding Tester,Pengadaan Material dan Tools
                                                                  Cellular, KWH Meter Swaden dan pengadaan
                                                                  Material Tools Cellular (PO Rp.12.243,- PPN
613      4-Mar-24         MANDIRI IDR          1220011559559      Rp.1.213.300,-)                                             12,243,300    11,030,000     1,213,300             -         12,243,300

                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                  Final as Build Kota Bandung - Akses Site RK0004 -
614      4-Mar-24         MANDIRI IDR          1220011559559      Office Bandung (FO Koneksi Bandung-Cimahi)                   7,490,616     6,913,350      760,469         183,203         7,490,616
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Pusat - Akses Site - Relokasi MRT Phase 2
615      4-Mar-24         MANDIRI IDR          1220011559559      CP 202 (Harmoni-Mangga Besar)                               36,554,298    34,162,895     3,757,918      1,366,515        36,554,298
                                                                  ASIA TELCO NETWORKS, PT , Pembelian Bracket
616      4-Mar-24         MANDIRI IDR          1220011559559      Polygon For MCP Sebanyak 150 Set                            54,112,500    48,750,000     5,362,500             -         54,112,500
                                                                  IWAN SOFYAN , Tagihan 100% atas Pekerjaan
617      4-Mar-24         MANDIRI IDR          1220011559559      Perbaikan 1 Pole FO site Cikole-006                           624,763       640,782            -           16,019          624,763
                                                                  TRIMASS JAYA SAKTI, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi Penataan Jaringan Utilitas
                                                                  Non SJUT Batch 6 Jalan Tembus KH.Mas
618      4-Mar-24         MANDIRI IDR          1220011559559      Mansyur - MP Penjernihan-001                                48,561,736    45,384,800     4,992,328      1,815,392        48,561,736
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
619      4-Mar-24         MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Pluit-062                    26,964,101    24,886,110     2,737,472        659,481        26,964,101

                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% atas Relokasi Pekerjaan Civil Works Tiang
620      4-Mar-24         MANDIRI IDR          1220011559559      Baja Octagonal Steel 21 M Site Ciracas-006                  26,964,101    24,886,110     2,737,472        659,481        26,964,101
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Cut Impact Kabel
621      4-Mar-24         MANDIRI IDR          1220011559559      Hit by Truck Site Semper Timur-005                           2,494,903     2,331,685      256,485          93,267         2,494,903
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi Tiang FO Impact Revitalisasi
                                                                  Saluran Air dan Perbaikan FO Site MP-Utan Kayu
622      4-Mar-24         MANDIRI IDR          1220011559559      Selatan-001                                                  2,204,933     2,060,685      226,675          82,427         2,204,933
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Tiang Miring SDA Jakarta
                                                                  Timur dan Perbaikan Kabel Landai Site MP-
623      4-Mar-24         MANDIRI IDR          1220011559559      Pondok Kopi-001                                             10,496,577     9,809,885     1,079,087        392,395        10,496,577

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Tarikan Reroute FO Impact Pelebaran
624      4-Mar-24         MANDIRI IDR          1220011559559      Jl.Bolong Renged Site Teluk Naga-004                        23,940,632    22,374,422     2,461,186        894,976        23,940,632
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive FO Perbaikan Link FO Site
625      4-Mar-24         MANDIRI IDR          1220011559559      MP-Karet Kuningan-001                                        2,206,645     2,062,285      226,851          82,491         2,206,645
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Dismantle Tiang FO dan Tarik Mundur
                                                                  Kabel FO Impact Pembangunan SDA Site Ancol-
626      4-Mar-24         MANDIRI IDR          1220011559559      031                                                          5,687,141     5,315,085      584,659         212,603         5,687,141
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 27U V3.0 2 Door sebanyak
                                                                  10Pcs, ODC 27U V2.1 1 Door sebanyak 10Pcs,
                                                                  Electrical sebanyak 10 Set, ODC 27U & 15U
                                                                  Bracket Frame sebanyak 20Pcs, Bracket Longdrat
627      5-Mar-24         MANDIRI IDR          1220011559559      sebanyak 60Pcs                                             333,371,850   300,335,000    33,036,850             -        333,371,850
Page 105
                                                                                               Page 42
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                            NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                    NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan ODC 64U 6 Door dan ODC 64U
628      5-Mar-24         MANDIRI IDR          1220011559559      Electrical masing - masing sebanyak 5Pcs                    218,670,000    197,000,000     21,670,000             -        218,670,000
                                                                  NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                                  Pengadaan Panel Box KWH 3 Phase sebanyak
629      5-Mar-24         MANDIRI IDR          1220011559559      40Pcs                                                        27,528,000     24,800,000      2,728,000             -         27,528,000
                                                                  DJAJA LISTRIK, PT , Pembelian Air Conditioner
                                                                  Spare Part Pipe AC Inverte 3 Roll, Paku Rivert SP
                                                                  550 Merk SIP 3 KTK, Cable Power AAAC/S 70mm
630      12-Mar-24        MANDIRI IDR          1220011559559      200 Mtr, dll                                                 21,717,150     19,565,000      2,152,150             -         21,717,150
                                                                  BINTANG MAS UTAMA, CV , Pembelian Cable
                                                                  Power NYAF 4MM Red Sebanyak 500 Mtr, Cable
631      12-Mar-24        MANDIRI IDR          1220011559559      NYAF 10MM Black Sebanyak 1.500 Mtr                           43,290,000     39,000,000      4,290,000             -         43,290,000

                                                                  BINTANG MAS UTAMA, CV , Pembelian Padlock
632      12-Mar-24        MANDIRI IDR          1220011559559      Jacket 40mm Stainless Steel Sebanyak 150 Pcs                  6,743,250      6,075,000       668,250              -          6,743,250
                                                                  BINTANG MAS UTAMA, CV , Pembelian PJU
633      12-Mar-24        MANDIRI IDR          1220011559559      Street Lamp 60 Watt Sebanyak 50 Pcs                          83,250,000     75,000,000      8,250,000             -         83,250,000

                                                                  SEWUN INDO KONSULTAN, PT , DP 30% atas Jasa
                                                                  Local Permit site Dadap-002, Curug Wetan-006,
634      12-Mar-24        MANDIRI IDR          1220011559559      Teluk Naga-006 dan Kosambi Barat-001                         45,150,000     42,000,000      4,620,000      1,470,000        45,150,000
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
                                                                  Additional Bordes Full Bracket sebanyak 6Pcs,
                                                                  Full Support sebanyak 6Pcs, Nut Bolt D 16MM L
                                                                  180MM sebanyak 18Pcs dan D 16MM L 110MM
635      12-Mar-24        MANDIRI IDR          1220011559559      sebanyak 24 Pcs                                               3,496,617      3,496,617            -               -          3,496,617
                                                                  PLN PERSERO, PT , Pengisian Pulsa Listrik Untuk
                                                                  Sambungan Baru (Permanent) Site Canggu-010
                                                                  dan Biaya Admin Rp.7.500,- dan kelebihan
                                                                  Penggunaan KWH Untuk Sambungan PLN
                                                                  Multiguna (Jatah 500 KWH) Site Padang Sambian-
636      13-Mar-24        SINARMAS IDR          0002999994        001                                                           3,175,116      3,175,116            -               -          3,175,116
                                                                  PLN PERSERO, PT , pembelian token PLN senilai
                                                                  Rp. 3.000.000 untuk sambungan baru
                                                                  (permanen) Site Abiansemal-001 dan Biaya
637      13-Mar-24        SINARMAS IDR          0002999994        Admin Rp.7.500,                                               3,007,500      3,007,500            -               -          3,007,500
                                                                  DUTA HITA JAYA, PT , DP 30% atas Pengadaan
638      13-Mar-24        MANDIRI IDR          1220011559559      MP 26M Light sebanyak 10 Set                                388,585,575    388,585,575            -               -        388,585,575
                                                                  IMAM TAUFIK , Biaya perbaikan FO Cut TT.J014-
                                                                  007 FO link BLL 08 to BLL 16 Jl. Bedugul-Singaraja
                                                                  (PO Rp.3.022.200,- Potongan PPh 21(2.5%)
639      13-Mar-24        SINARMAS IDR          0002999994        Rp.75.555,-                                                   2,946,645      3,022,200            -           75,555         2,946,645
                                                                  BIBIT , Biaya Paket Pekerjaan Relokasi Jalur FO
                                                                  MCP 750627 Sukawati-002 to MCP 750654
                                                                  Abianbase-001 Impact proyek MPP Buruan (PO
                                                                  Rp.4.708.885,- Potongan PPh 21(2.5%)
640      13-Mar-24        SINARMAS IDR          0002999994        Rp.117.722,-)                                                 4,591,163      4,708,885            -          117,722         4,591,163
                                                                  BIBIT , Biaya Perbaikan FO Cut TT.J0104-009 link
                                                                  aksess GNY_77 to GNY_04 Jln. Kangetan, Lod
                                                                  Tunduh Gianyar).(PO Rp.2.521.000,- Potongan
641      13-Mar-24        SINARMAS IDR          0002999994        PPh 21(2.5%) Rp.63.025,-)                                     2,457,975      2,521,000            -           63,025         2,457,975
                                                                  BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                                  100% Paket Pekerjaan FO Network Optimization
642      14-Mar-24        MANDIRI IDR          1220011559559      15794m                                                    2,156,955,327   1,974,329,818   217,176,280     34,550,771     2,156,955,327
                                                                  NE GENSET BALI, TOKO , Biaya service Dinamo
                                                                  Ampere Genset Cummins 4BTA3.9 G1 40 KVA Di
                                                                  Site_04 Pratama (PO Rp.1.800.000,- Potongan
643      15-Mar-24        SINARMAS IDR          0002999994        PPh 2%) Rp.36.000,- )                                         1,764,000      1,800,000            -           36,000         1,764,000
Page 106
                                                                                              Page 43
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK     DPP           PPN             PPh         NET DIBAYARKAN

                                                                  EDI SLAMET , Biaya Pekerjaan Collocation Site
                                                                  751185 Baha-001 (Tenant XL)(PO Rp.1.526.331,-
644      15-Mar-24        SINARMAS IDR          0002999994        Potongan PPh 21(2.5%) Rp.38.158,- )                        1,488,173     1,526,331           -           38,158         1,488,173
                                                                  PLN PERSERO, PT , Biaya Upgrade PLN 13.200 VA
                                                                  Site Jimbaran-029, Ungasan-009 dan Jimbaran-
645      15-Mar-24        SINARMAS IDR          0002999994        019 dan Biaya Admin Rp.15.000,-                           22,823,745    22,823,745           -               -         22,823,745
                                                                  PLN PERSERO, PT , Biaya Pergeseran KWH Meter
                                                                  dari M_29 Pura Uluwatu ke Site 221237 Pecatu-
646      15-Mar-24        SINARMAS IDR          0002999994        003                                                        1,501,566     1,501,566           -               -          1,501,566
                                                                  DUTA CIPTA SARANA, PT , Paket Pekerjaan Civil
                                                                  Work Tiang Monopole Octagonal 30m Site
                                                                  211242 Sibang Kaja_004 (PO Rp.73.250.123,-
                                                                  PPN Rp.7.259.021,- Potongan PPh 4(2)1.75%
647      15-Mar-24        MANDIRI IDR          1220011559559      Rp.1.154.844,- )                                          72,095,279    65,991,102     7,259,021      1,154,844        72,095,279
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan FO - Link Akses
648      15-Mar-24        MANDIRI IDR          1220011559559      to Ungasan-007                                             8,292,273     7,590,181      834,920         132,828         8,292,273
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan FO - Link Akses
649      15-Mar-24        MANDIRI IDR          1220011559559      to Lukluk-001                                              8,790,453     8,046,181      885,080         140,808         8,790,453
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan FO - Link Akses
650      15-Mar-24        MANDIRI IDR          1220011559559      to Kuta-028                                               17,089,696    15,642,741     1,720,702        273,747        17,089,696
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan FO - Link Akses
651      15-Mar-24        MANDIRI IDR          1220011559559      to Dalung-002                                              8,415,004     7,702,521      847,277         134,794         8,415,004
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan FO - Link Akses
652      15-Mar-24        MANDIRI IDR          1220011559559      to Combat Pecatu-001                                       2,542,598     2,327,321      256,005          40,728         2,542,598
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Penarikan FO - Link Akses
653      15-Mar-24        MANDIRI IDR          1220011559559      to Baha-001                                                5,645,517     5,167,521      568,427          90,431         5,645,517

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Civil Work Monopole
654      15-Mar-24        MANDIRI IDR          1220011559559      Octagonal 30 Meter Site Sading-002                        72,095,279    65,991,102     7,259,021      1,154,844        72,095,279
                                                                  HANDASA KONSULTAN, PT , Potongan PPh 4(2)
                                                                  3.5% DP 40% untuk Kebutuhan Biaya Jasa
                                                                  Pengurusan Sertifikat Laik Fungsi (SLF) untuk
                                                                  pekerjaan SLF 6 Site MCP Badung ( PO
                                                                  Rp.79.920.000,- PPN Rp.3.168.000,- Potongan
655      15-Mar-24        MANDIRI IDR          1220011559559      PPh 4(2) 3.5% Rp.1.008.000,- )                            (1,008,000)          -             -        1,008,000        (1,008,000)

                                                                  HANDASA KONSULTAN, PT , DP 40% untuk
                                                                  Kebutuhan Biaya Jasa Pengurusan Sertifikat Laik
                                                                  Fungsi (SLF) untuk pekerjaan SLF 6 Site MCP
                                                                  Badung ( PO Rp.79.920.000,- PPN Rp.3.168.000,-
656      15-Mar-24        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 3.5% Rp.1.008.000,- )                   28,800,000    28,800,000           -               -         28,800,000

                                                                  HANDASA KONSULTAN, PT , PPN DP 40% untuk
                                                                  Kebutuhan Biaya Jasa Pengurusan Sertifikat Laik
                                                                  Fungsi (SLF) untuk pekerjaan SLF 6 Site MCP
                                                                  Badung ( PO Rp.79.920.000,- PPN Rp.3.168.000,-
657      15-Mar-24        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 3.5% Rp.1.008.000,- )                    3,168,000           -       3,168,000             -          3,168,000
Page 107
                                                                                              Page 44
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN

                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  Pekerjaan Perkuatan MP20 Site M_206 Sanggar
                                                                  Buana (PO Rp.48.636.875,- PPN Rp.4.819.871,-
658      15-Mar-24        MANDIRI IDR          1220011559559      Potongan PPh 4(2) 2.65% Rp.1.161.151,-                     47,475,725   43,817,005     4,819,871      1,161,151        47,475,725
                                                                  REKAYASA TECHNOLOGY PERSADA, PT , Biaya
                                                                  Pekerjaan Instalasi Tiang & ME Grounding &
                                                                  Aksesoris Pole Octagonal 26m Site 751190
                                                                  Abiansemal-001 (Rp.45.488.002,- PPN
                                                                  Rp.4.507.820,- Potongan PPh 4(2) 2.65%
659      15-Mar-24        MANDIRI IDR          1220011559559      Rp.1.085.975,- )                                           44,402,027   40,980,182     4,507,820      1,085,975        44,402,027
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Paket
                                                                  Pekerjaan Dismantle Rooftop Pole 6m Site
                                                                  DPS_08 Pertigaan Imam Bonjol (PO
                                                                  Rp.10.569.830,- PPN Rp.1.047.461,- Potongan
660      15-Mar-24        MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp.166.641,- )                              10,403,188    9,522,369     1,047,460        166,641        10,403,188
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Pekerjaan
                                                                  Penarikan Kabel Udara 24 core - FO Link Akses to
                                                                  751162 Kerobokan Kelod-020 - SPK No.
                                                                  049/BTS/PS-BALI/SPK/III/2023 (PO
                                                                  Rp.11.705.817,- PPN Rp.1.160.035,- Potongan
661      15-Mar-24        MANDIRI IDR          1220011559559      PPh 4(2) 1.75% Rp. 184.551,- )                             11,521,265   10,545,781     1,160,035        184,551        11,521,265
                                                                  KESA UTAMA SEJAHTERA, PT , Biaya Pekerjaan
                                                                  Penarikan FO - Link Akses to 751010 Seminyak-
                                                                  001 - SPK No. 083/BTS/PSBALI/SPK/IV/2023 (PO
                                                                  Rp.6.671.234,- PPN Rp.661.113,- Potongan PPh
662      15-Mar-24        MANDIRI IDR          1220011559559      4(2) 1.75% Rp.105.177,-)                                    6,566,057    6,010,121      661,113         105,177         6,566,057
                                                                  EDI SLAMET , Biaya Pekerjaan Dismantle MCP
                                                                  21m Concrete (Design 2017) Site 751018 Kuta-
                                                                  005(PO Rp.9.931.320,- Potongan PPh 21(2.5%)
663      15-Mar-24        MANDIRI IDR          1220011559559      Rp.248.283,-)                                               9,683,037    9,931,320           -          248,283         9,683,037

                                                                  EDI SLAMET , "Biaya Paket Pekerjaan New
                                                                  Collocation XL Site_02 UNUD (PO Rp.10.773.514,-
664      15-Mar-24        MANDIRI IDR          1220011559559      Potongan PPh 21(2.5%) Rp.269.338,-)                        10,504,176   10,773,514           -          269,338        10,504,176
                                                                  BINTANG MAS UTAMA, CV , Biaya Pembelian
                                                                  Box Fire Extinguisher dan Fire Extinguiser CO2
                                                                  untuk kebutuhan Proses SLF Pada Site
                                                                  Operational Regional Bali (PO Rp.7.159.500,-
665      15-Mar-24        MANDIRI IDR          1220011559559      PPN Rp.709.500,- )                                          7,159,500    6,450,000      709,500              -          7,159,500

                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
666      15-Mar-24        MANDIRI IDR          1220011559559      Pondasi site M10 Sawangan Nusa Dua MP 30M                   7,875,000    7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
667      15-Mar-24        MANDIRI IDR          1220011559559      Pondasi site M17 Pura Petitenget MP 20M                     7,875,000    7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
                                                                  Pondasi site M32 Pura Kelan Ex. Kedonganan MP
668      15-Mar-24        MANDIRI IDR          1220011559559      15M                                                         7,875,000    7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
669      15-Mar-24        MANDIRI IDR          1220011559559      Pondasi site M33 Persimp. Toyaning MP 15M                   7,875,000    7,500,000      825,000         450,000         7,875,000

                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
670      15-Mar-24        MANDIRI IDR          1220011559559      Pondasi site M34 Persimp. Imam Bonjol MP 15M                7,875,000    7,500,000      825,000         450,000         7,875,000
Page 108
                                                                                              Page 45
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                         NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
671      15-Mar-24        MANDIRI IDR          1220011559559      Pondasi site M59 Batu Canggu MP 30M                          7,875,000     7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
672      15-Mar-24        MANDIRI IDR          1220011559559      Pondasi site M82 St. Regis Selatan MP 30M                    7,875,000     7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Survey,
                                                                  Analisa Kapasitas Pole dan Analisa Kapasitas
673      15-Mar-24        MANDIRI IDR          1220011559559      Pondasi site M201 Padma Utara MP 15M                         7,875,000     7,500,000      825,000         450,000         7,875,000
                                                                  POLA REKAYASA UTAMA, PT , Jasa Cek
674      15-Mar-24        MANDIRI IDR          1220011559559      Kemiringan site GNY09 Pejeng Kelod SST 42m                   2,100,000     2,000,000      220,000         120,000         2,100,000
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan MP 26m OCT V1.2 STRT Slip
675      15-Mar-24        MANDIRI IDR          1220011559559      Joint V1 sebanyak 1 Set                                     22,477,500    20,250,000     2,227,500             -         22,477,500
                                                                  SEMBILAN BELAS MULTI USAHA, PT , Tagihan
                                                                  Retensi 10% atas Pekerjaan Penarikan Kabel FO
                                                                  Final as Build Kota Bandung - Akses Site - RK0004
676      15-Mar-24        MANDIRI IDR          1220011559559      Office Bandung                                              19,676,472    18,010,500     1,981,155        315,183        19,676,472
                                                                  IMAM TAUFIK , Biaya pekerjaan relokasi tiang FO
                                                                  Link Protection BSC Gunung Islam Griya Tanah
                                                                  Kilap Badung (PO Rp.2.156.245,- Potongan PPh
677      15-Mar-24        SINARMAS IDR          0002999994        21(2.5%) Rp. 53.906,-)                                       2,102,339     2,156,245           -           53,906         2,102,339
                                                                  IMAM TAUFIK , Biaya perbaikan FO Cut TT.J0117-
                                                                  015 link S31 to S32 Jl. Rampai, Baha, Mengwi (PO
                                                                  Rp.2.471.100,- Potongan PPh 21(2.5%)
678      15-Mar-24        SINARMAS IDR          0002999994        Rp.61.778,-)                                                 2,409,322     2,471,100           -           61,778         2,409,322
                                                                  BIBIT , Biaya Relokasi P7_17 FO S16 to S13 Jln.
                                                                  Uluwatu - Ungasan comecase pemilik lahan (PO
                                                                  Rp.1.044.636,- Potongan PPh 21(2.5%)
679      15-Mar-24        SINARMAS IDR          0002999994        Rp.26.116,-)                                                 1,018,520     1,044,636           -           26,116         1,018,520
                                                                  SKILL GLOBALINDO SUKSES, PT , Tagihan 100%
                                                                  atas Relokasi 1 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Pole Octagonal 21 M Site
680      15-Mar-24        MANDIRI IDR          1220011559559      Pademangan Timur-006                                        15,783,116    14,446,788     1,589,146        252,818        15,783,116
                                                                  SKILL GLOBALINDO SUKSES, PT , Tagihan 100%
                                                                  atas Relokasi 2 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Pole Octagonal 21 M Site
681      15-Mar-24        MANDIRI IDR          1220011559559      Pademangan Timur-006                                        20,120,981    18,417,374     2,025,911        322,304        20,120,981
                                                                  SKILL GLOBALINDO SUKSES, PT , Tagihan 100%
                                                                  atas Pekerjaan Additional ME Grounding &
682      15-Mar-24        MANDIRI IDR          1220011559559      Accessories Telematika 14/900 Site Cikole-005                4,959,729     4,539,798      499,377          79,446         4,959,729
                                                                  MANNA ABADI SEJAHTERA, PT , Tagihan 100%
                                                                  atas Pekerjaan Relokasi Jl. Kedoya Jakarta Barat
                                                                  Impact Penataan Jaringan Utilitas Site MP-
683      15-Mar-24        MANDIRI IDR          1220011559559      Kedoya Selatan-001                                         125,020,238   114,435,000    12,587,850      2,002,612       125,020,238

                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Pekerjaan Dismantle ME Telematika &
684      15-Mar-24        MANDIRI IDR          1220011559559      Accessories Telematika 14/900 Site Ancol-031                10,631,446     9,731,300     1,070,443        170,297        10,631,446
                                                                  DINAMIKON INOVASI TEKNOLOGI, PT , Tagihan
                                                                  100% atas Relokasi 1 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Pole Beton 14/900 Site Ancol-
685      15-Mar-24        MANDIRI IDR          1220011559559      031                                                         27,369,867    25,052,509     2,755,776        438,418        27,369,867

                                                                  REKATAMA SOLUSINDO, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi FO Simpang Gondrong Jl
686      15-Mar-24        MANDIRI IDR          1220011559559      KH.Hasyim Asyari Tangerang - Neroktog-004                   75,586,213    69,186,465     7,610,511      1,210,763        75,586,213
Page 109
                                                                                              Page 46
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                        NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP            PPN             PPh         NET DIBAYARKAN
                                                                  AREA BADUNG , Akuisisi Site 211248 Lukluk_003
                                                                  seluas 9 m2, Jangka waktu 10 tahun periode
                                                                  2024-2034 (PO Rp.255.555.555,- Potongan PPh
687      19-Mar-24        MANDIRI IDR          1220011559559      4(2) 10% Rp.25.555.555,-)                                 230,000,000   230,000,000           -               -        230,000,000
                                                                  MEDIA FIROPTIX INDONESIA, PT , Tagihan 100%
                                                                  atas Pekerjaan Penarikan Kabel FO Final as Build
                                                                  Jakarta Timur - Akses Site - Relokasi Jalan
688      19-Mar-24        MANDIRI IDR          1220011559559      Pahlawan Revolusi (Sisi Selatan BKT)                      253,014,763   231,592,460    25,475,171      4,052,868       253,014,763
                                                                  GIGA DATACOM, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Link Akses - Dauh Puri
689      20-Mar-24        MANDIRI IDR          1220011559559      Klod-010                                                   17,374,594    16,237,938     1,786,173        649,517        17,374,594
                                                                  BERCA HARDAYAPERKASA, PT , Pembelian Joint
                                                                  Closure Inline 48 Core Full Set NWC Sebanyak 3
690      20-Mar-24        MANDIRI IDR          1220011559559      Unit                                                        3,676,886     3,312,510      364,376              -          3,676,886
                                                                  GRAHA ARJANI AULIA DEKORTAMA, PT ,
                                                                  Pembelian Tools Torque Wrench 0.75 Inch 100-
691      20-Mar-24        MANDIRI IDR          1220011559559      500NM Sebanyak 2 Pcs                                        7,493,832     6,751,200      742,632              -          7,493,832
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
692      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 26 M Site Tawangsari-008                     2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
693      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Plombokan-003                      4,549,509     4,198,900      461,879         111,270         4,549,509
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
694      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Pekunden-009                       2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
695      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Sekayu-001                         2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
696      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Wonodri-001                        2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
                                                                  Pole Octagonal 21 M Site Ngemplaksimongan-
697      20-Mar-24        MANDIRI IDR          1220011559559      002                                                         4,549,509     4,198,900      461,879         111,270         4,549,509
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
698      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Karangtempel-001                   2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
699      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Gisikdrono-011                     2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
700      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Veteran MP                         2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
701      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Mugassari-001                      2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
702      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Karangkidul-002                    2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
703      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Bendungan-001                      2,944,520     2,717,600      298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
704      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Pekunden-005                       2,944,520     2,717,600      298,936          72,016         2,944,520
Page 110
                                                                                               Page 47
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
705      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Miroto-007                         2,944,520      2,717,600       298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
706      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Wonodri-002                        2,944,520      2,717,600       298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
707      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Karang Ayu-005                     2,944,520      2,717,600       298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
708      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Bojongsalaman-002                  2,944,520      2,717,600       298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
709      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Miroto-006                         2,944,520      2,717,600       298,936          72,016         2,944,520
                                                                  BANYU MANUNGGAL SEJAHTERA, PT , Tagihan
                                                                  100% Corrective ME Grounding & Accessories
710      20-Mar-24        MANDIRI IDR          1220011559559      Pole Octagonal 21 M Site Barusari-007                       2,944,520      2,717,600       298,936          72,016         2,944,520
                                                                  TRIMASS JAYA SAKTI, PT , Tagihan 100% atas
                                                                  Pekerjaan Jalur Relokasi Jaringan Utilitas Fiber
                                                                  Optic Impact Penataan Jaringan Utilitas Jl Balap
711      20-Mar-24        MANDIRI IDR          1220011559559      Sepeda - Kawasan Velodrome                                 99,563,500     93,050,000     10,235,500      3,722,000        99,563,500
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
712      20-Mar-24        MANDIRI IDR          1220011559559      15975m                                                  2,189,472,969   2,004,094,250   220,450,368     35,071,649     2,189,472,969
                                                                  EDI SLAMET , Biaya Pekerjaan Collocation Site
                                                                  751213 Tuban-010(PO Rp.2.543.360,- Potongan
713      21-Mar-24        SINARMAS IDR          0002999994        PPh 21(2.5%) Rp.63.584,-)                                   2,479,776      2,543,360            -           63,584         2,479,776

                                                                  AREA BADUNG , Pengajuan Biaya Budget IW
                                                                  Untuk Warga Penyanding dan Kontribusi Banjar
                                                                  Site 211248 Lukluk_003(PO Rp.42.641.025,-
714      21-Mar-24        SINARMAS IDR          0002999994        Potongan PPh 21(2.5%) Rp.641.025,-                         42,000,000     42,000,000            -               -         42,000,000
                                                                  PLN PERSERO, PT , Biaya Upgrade PLN 13.200 VA
                                                                  Site Kerobokan Kelod_025 dan Biaya Admin
715      21-Mar-24        SINARMAS IDR          0002999994        Rp.5.000,-                                                  7,778,745      7,778,745            -               -          7,778,745
                                                                  PLN PERSERO, PT , Biaya administrasi registrasi
                                                                  sambungan baru PLN site Jimbaran-030 dan
716      21-Mar-24        SINARMAS IDR          0002999994        Biaya Admin Rp.5.000,-                                      7,976,300      7,976,300            -               -          7,976,300
                                                                  PLN PERSERO, PT , Biaya registrasi sambungan
                                                                  baru PLN site Sedang-001 dan Biaya Admin
717      21-Mar-24        SINARMAS IDR          0002999994        Rp.5.000,-                                                 14,983,800     14,983,800            -               -         14,983,800
                                                                  IMAM TAUFIK , Biaya pekerjaan Perbaikan FO
                                                                  Cut TT.J0129-010 FO Link BLL_08 to BLL_16 Jln
                                                                  Raya Sukasada-Buleleng(PO Rp.1.791.900,-
718      21-Mar-24        SINARMAS IDR          0002999994        Potongan PPh 21(2.5%) Rp.44.798,-)                          1,747,102      1,791,900            -           44,798         1,747,102
                                                                  IMAM TAUFIK , Biaya pekerjaan Perbaikan FO
                                                                  Cut TT.J0207-004 FO Link Site_01 to Site_10 Jln
                                                                  Pantai Padang-padang(PO Rp.1.854.600,-
719      21-Mar-24        SINARMAS IDR          0002999994        Potongan PPh 21(2.5%) Rp.46.365,- )                         1,808,235      1,854,600            -           46,365         1,808,235
                                                                  BIBIT , Biaya pekerjaan Perbaikan FO Cut
                                                                  TT.J0117-019 Relokasi FO GNY_04 to
                                                                  Sukawati_002 comecase PU Gianyar Tahap 2 (PO
                                                                  Rp.2.307.000,- Potongan PPh 21(2.5%)
720      21-Mar-24        SINARMAS IDR          0002999994        Rp.57.675,-)                                                2,249,325      2,307,000            -           57,675         2,249,325
                                                                  BIBIT , Biaya Pekerjaan Relokasi FO comecase
                                                                  Fore Coffe TT.J0205-013 FO aksess MCP Dauh
                                                                  Puri Kelod-010(PO Rp.2.962.200,- Potongan PPh
721      21-Mar-24        SINARMAS IDR          0002999994        21(2.5%) Rp.74.055,-)                                       2,888,145      2,962,200            -           74,055         2,888,145
Page 111
                                                                                              Page 48
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                          NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN            NAMA VENDOR DAN KETERANGAN                   NILAI MUTASI BANK      DPP            PPN             PPh         NET DIBAYARKAN

                                                                  PENTAWIRA CIPTA LARAS INDONESIA, PT ,
                                                                  Tagihan 100% atas Pekerjaan Relokasi Jaringan
722      21-Mar-24        MANDIRI IDR          1220011559559      Utilitas Jl. Laut Arafuru Pondok Bambu-006                103,713,623     95,720,925     10,529,302      2,536,604       103,713,623
                                                                  KUADRAN SOLUSINDO MANDIRI, PT , Tagihan
                                                                  100% atas Relokasi 1 (Dismantle & Re-Install)
                                                                  Perangkat Tenant Pole Beton 14/900 site Karet
723      21-Mar-24        MANDIRI IDR          1220011559559      Tengsin-016                                                19,822,383     18,144,057      1,995,846        317,520        19,822,383
                                                                  OPTICAL LINTAS TEKNOLOGI, PT , Tagihan 100%
                                                                  atas Pekerjaan Relokasi non SJUT Batch 4, Jalur
                                                                  Relokasi Jaringan Utilitas Fiber Optic Jl. Rawa
724      21-Mar-24        MANDIRI IDR          1220011559559      Tembaga - Kota Bekasi - Marga Jaya-001                     41,918,448     38,688,000      4,255,680      1,025,232        41,918,448
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN untuk
                                                                  Project Wifi dan CCTV Taman 23 Site by Cash
725      22-Mar-24        MANDIRI IDR          1220011559559      Advance - Trf                                               4,264,500      4,264,500            -               -          4,264,500
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN untuk
                                                                  Project Wifi dan CCTV Taman 23 Site by Cash
726      22-Mar-24        MANDIRI IDR          1220011559559      Advance - Trf                                               8,529,000      8,529,000            -               -          8,529,000
                                                                  PLN PERSERO, PT , Uang Muka Beban Umum
                                                                  atas Pengajuan (Biaya Registrasi dan Biaya
                                                                  Admin) Percepatan Pembayaran PLN untuk
                                                                  Project Wifi dan CCTV Taman 23 Site by Cash
727      25-Mar-24        MANDIRI IDR          1220011559559      Advance - Trf                                               4,264,500      4,264,500            -               -          4,264,500
                                                                  PLN PERSERO, PT , Biaya Penyambungan Daya
                                                                  PLN Site Pademangan Barat-002 Priority Indosat -
728      25-Mar-24        MANDIRI IDR          1220011559559      MCP Project                                                12,033,900     12,033,900            -               -         12,033,900
                                                                  CIPTABUANA TRANS ABADI, PT , Tagihan 100%
                                                                  Paket Pekerjaan FO Network Optimization
729      25-Mar-24        MANDIRI IDR          1220011559559      15668m                                                  2,147,690,387   1,965,849,324   216,243,426     34,402,363     2,147,690,387
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Special Mounting
730      26-Mar-24        MANDIRI IDR          1220011559559      sebanyak 33 Set                                            62,271,004     56,100,004      6,171,000             -         62,271,004
                                                                  KONSTRUKSI BAJA CIKANDE, PT , Tagihan 100%
                                                                  atas Pengadaan Material Anchor sebanyak 36
731      26-Mar-24        MANDIRI IDR          1220011559559      Pcs, Plate Setting sebanyak 6 Pcs                           5,744,263      5,175,012       569,251              -          5,744,263
                                                                  EDI SLAMET , Pekerjaan Dismantle Kamuflase
                                                                  Radome LP 15 m di Site M35 Taman Mumbul
                                                                  (PO Rp.3.690.858,- Potongan PPh 21(2.5%)
732      27-Mar-24        SINARMAS IDR          0002999994        Rp.92.271,-)                                                3,598,587      3,690,858            -           92,271         3,598,587

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan Kabel FO Final as Build Kota
733      27-Mar-24        MANDIRI IDR          1220011559559      Tangerang - Akses Site - Buaran Indah-005                  12,120,960     11,328,000      1,246,080        453,120        12,120,960
                                                                  IMAM TAUFIK , Biaya Pekerjaan Perbaikan FO
                                                                  Cut TT.J121-001 FO Link BLL_08 to BLL_16 Jln.
                                                                  Bedugul-Singaraja(PO Rp.3.363.800,- Potongan
734      27-Mar-24        SINARMAS IDR          0002999994        PPh 21(2.5%) Rp.84.095,-                                    3,279,705      3,363,800            -           84,095         3,279,705
                                                                  BIBIT , Biaya pekerjaan Perbaikan FO Cut Link
                                                                  Site_05 to Site_18 TT.J0128-010 FO Link S05 to
                                                                  S18 Jln. Teuku Umar-Denpasar (PO
                                                                  Rp.1.406.900,- Potongan PPh 21(2.5%)
735      27-Mar-24        SINARMAS IDR          0002999994        Rp.35.173,-)                                                1,371,727      1,406,900            -           35,173         1,371,727
Page 112
                                                                                              Page 49
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                       NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                  NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  BIBIT , Biaya Perbaikan FO Cut TT J0217-003 link
                                                                  S47 to Masban-Kawasan Dep Bandara Ngurah
                                                                  Rai Badung (PO Rp.1.674.000,- Potongan PPh
736      27-Mar-24        SINARMAS IDR          0002999994        21(2.5%) Rp.41.850,-)                                       1,632,150    1,674,000          -            41,850         1,632,150
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Kabel Landai
737      27-Mar-24        MANDIRI IDR          1220011559559      Site Penjaringan-010                                        3,541,363    3,309,685      364,065         132,387         3,541,363

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel Landai dan Tiang
738      27-Mar-24        MANDIRI IDR          1220011559559      Miring Jovis Batch 07 Site MP-Semper Timur-001              7,131,855    6,665,285      733,181         266,611         7,131,855

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel Landai dan Tiang
739      27-Mar-24        MANDIRI IDR          1220011559559      Miring Jovis Batch 08 Site MP-Semper Barat-001              6,678,603    6,241,685      686,585         249,667         6,678,603
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Dismantle Kabel FO dan Tiang FO 7mtr
740      27-Mar-24        MANDIRI IDR          1220011559559      Site Kebong Kosong-002                                      3,728,827    3,484,885      383,337         139,395         3,728,827

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive Perbaikan Tiang Miring dan
741      27-Mar-24        MANDIRI IDR          1220011559559      Perbaikan Kabel FO Site MP-Kalideres-001                    5,193,443    4,853,685      533,905         194,147         5,193,443
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive Perbaikan Tiang FO
                                                                  Crossing dan Perapihan Kabel Site MP-Meruya
742      27-Mar-24        MANDIRI IDR          1220011559559      Selatan-001                                                 6,321,009    5,907,485      649,823         236,299         6,321,009

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive Perbaikan Link FO dan
743      27-Mar-24        MANDIRI IDR          1220011559559      Tiang CRM Binamarga Site MP-Duri Kosambi-001                5,573,079    5,208,485      572,933         208,339         5,573,079
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Dismantle Tiang FO Impact SDA Jl.Laut
744      27-Mar-24        MANDIRI IDR          1220011559559      Arafuru Site Pondok Bambu-006                               3,638,733    3,400,685      374,075         136,027         3,638,733
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive Peninggian Kabel FO
745      27-Mar-24        MANDIRI IDR          1220011559559      Crossing Site MP-Kelapa Gading Barat-002                    4,671,069    4,365,485      480,203         174,619         4,671,069
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Pemutusan
746      27-Mar-24        MANDIRI IDR          1220011559559      Binamarga Site Pondok Kopi-009                              2,969,769    2,775,485      305,303         111,019         2,969,769

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel FO Ducting Impact
747      27-Mar-24        MANDIRI IDR          1220011559559      Pembuatan Trotoar Site MP-Sunter Agung-001                  7,301,129    6,823,485      750,583         272,939         7,301,129
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Replace Tiang FO 9mtr Crossing Site
748      27-Mar-24        MANDIRI IDR          1220011559559      MP-Semper Barat-001                                         3,585,447    3,350,885      368,597         134,035         3,585,447
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr dan Perbaikan
749      27-Mar-24        MANDIRI IDR          1220011559559      Kabel FO Site MP-Batu Ampar-002                             9,599,703    8,971,685      986,885         358,867         9,599,703

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive FO Perbaikan Link Cluster
750      27-Mar-24        MANDIRI IDR          1220011559559      Kota Bambu Site MP-Kota Bambu Utara-001                     3,131,553    2,926,685      321,935         117,067         3,131,553

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr dan Perbaikan
751      27-Mar-24        MANDIRI IDR          1220011559559      Kabel FO Crossing Road Site MP-Cibubur-001                  5,175,253    4,836,685      532,035         193,467         5,175,253
Page 113
                                                                                             Page 50
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum
Rincian Investasi Pembangunan MCP
         TANGGAL                                                                                                                                      NILAI YANG DIBAYARKAN
      PENGELUARAN DI   REKENING BANK YANG   NOMOR REKENING BANK
NO.   BANK STATEMENT       DIGUNAKAN          YANG DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                 NILAI MUTASI BANK    DPP           PPN             PPh         NET DIBAYARKAN
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Preventive FO Site MP-
752      27-Mar-24        MANDIRI IDR          1220011559559      Pondok Pinang-001                                          5,075,957    4,743,885      521,827         189,755         5,075,957
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Preventive FO Site MP-
753      27-Mar-24        MANDIRI IDR          1220011559559      Cipulir-002                                                2,424,283    2,265,685      249,225          90,627         2,424,283
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Kabel
754      27-Mar-24        MANDIRI IDR          1220011559559      Vandalisme Site Penjagalan-001                             2,363,293    2,208,685      242,955          88,347         2,363,293
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel Landai dan
                                                                  Penambahan Accessories Site MP-Karang Anyar-
755      27-Mar-24        MANDIRI IDR          1220011559559      001                                                        8,209,131    7,672,085      843,929         306,883         8,209,131

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Instalasi Tiang FO 9mtr Crossing dan
756      27-Mar-24        MANDIRI IDR          1220011559559      Perbaikan Tiang FO Site Meruya Selatan-029                 3,781,043    3,533,685      388,705         141,347         3,781,043

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Preventive FO Perbaikan Link FO dan
757      27-Mar-24        MANDIRI IDR          1220011559559      Dismantle Tiang FO Site MP-Kalideres-001                   2,543,695    2,377,285      261,501          95,091         2,543,695

                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perapihan Kabel Landai dan Perbaikan
758      27-Mar-24        MANDIRI IDR          1220011559559      Tiang Miring Site Pulo Sirih Utama MP                      5,093,933    4,760,685      523,675         190,427         5,093,933
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Dismantle FO Crossing dan Perbaikan
759      27-Mar-24        MANDIRI IDR          1220011559559      Kabel FO Site Paseban-002                                  2,946,443    2,753,685      302,905         110,147         2,946,443
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Patroli Kabel Landai, Perbaikan Tiang
                                                                  Miring dan Pemasangan Accessories Site MP-
760      27-Mar-24        MANDIRI IDR          1220011559559      Ulujami-001                                                6,022,693    5,628,685      619,155         225,147         6,022,693
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Kabel Landai dan Tiang FO
761      27-Mar-24        MANDIRI IDR          1220011559559      Miring Site MP-Duri Kepa-001                               7,213,322    6,741,422      741,556         269,656         7,213,322
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Penarikan FO Cut Impact Hit by Truck
762      27-Mar-24        MANDIRI IDR          1220011559559      Site Pegangsaan Dua-022                                    3,117,643    2,913,685      320,505         116,547         3,117,643
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Pemasangan Tiang FO dan Perbaikan
763      27-Mar-24        MANDIRI IDR          1220011559559      Kabel Site Bangka-012                                      2,503,463    2,339,685      257,365          93,587         2,503,463
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi Tiang FO dan Perbaikan Kabel
764      27-Mar-24        MANDIRI IDR          1220011559559      FO Site Gedong-002                                         2,452,103    2,291,685      252,085          91,667         2,452,103
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan FO Cut Impact Hit by Truck
765      27-Mar-24        MANDIRI IDR          1220011559559      Site Pluit-024                                             2,564,453    2,396,685      263,635          95,867         2,564,453
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Perbaikan Preventive FO Cluster Site
766      27-Mar-24        MANDIRI IDR          1220011559559      MP-Jagakarsa-001                                           2,213,065    2,068,285      227,511          82,731         2,213,065
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi Tiang FO Impact Pembuatan
                                                                  Saluran Pekerjaan SDA Jakbar Site MP-Ulujami-
767      27-Mar-24        MANDIRI IDR          1220011559559      001                                                        4,272,173    3,992,685      439,195         159,707         4,272,173
                                                                  SANTA MULTI SEMESTA, PT , Tagihan 100% atas
                                                                  Pekerjaan Relokasi dan Perbaikan Tiang FO
                                                                  Impact SDA Jl.Tanjung Duren Site MP-Duri Kepa-
768      27-Mar-24        MANDIRI IDR          1220011559559      001                                                        4,281,803    4,001,685      440,185         160,067         4,281,803
Page 114

          
Page 115
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 1
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                            NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh        NET DIBAYARKAN

                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
 1      2-Oct-23        BCA IDR          3193058058     Listrik di The Kensington periode Aug 2023                   131,487     130,185        14,320         13,018           131,487
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber 4core
                                                        segmen Mall Karawang - Karawang Regency periode
 2      2-Oct-23        BCA IDR          3193058058     Sept 2023                                                  9,679,200    8,880,000      976,800        177,600         9,679,200
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Battery Lithium 48V 100AH ZTE dari WH
 3      2-Oct-23      MANDIRI IDR       1220011559559   Serpong ke WH Matraman                                       644,150     650,000         7,150         13,000           644,150
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
 4      2-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman                495,500     500,000         5,500         10,000           495,500
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Kabel ADSS 48 Core dari PT Prysmian Cable
 5      2-Oct-23      MANDIRI IDR       1220011559559   Indonesia ke PT Dinamikon Inovasi Teknologi                1,308,000    1,200,000      132,000         24,000         1,308,000
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Kabel ADSS 32 & 96 Core dari PT CCSI ke PT
 6      2-Oct-23      MANDIRI IDR       1220011559559   Dinamikon Inovasi Teknologi                                3,433,500    3,150,000      346,500         63,000         3,433,500
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Cable Optical Drop SM 1 Core dari PT
 7      2-Oct-23      MANDIRI IDR       1220011559559   Furukawa ke WH Serpong                                     2,398,000    2,200,000      242,000         44,000         2,398,000
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material Telematika dari WH Serpong ke CV Ekasindo
 8      2-Oct-23      MANDIRI IDR       1220011559559   Energi Doa                                                 3,468,500    3,500,000       38,500         70,000         3,468,500
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material ODC, Modular, Doorlock dari PT Nobi Putra
 9      2-Oct-23      MANDIRI IDR       1220011559559   Angkasa ke WH Serpong                                      1,025,685    1,035,000       11,385         20,700         1,025,685
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Bali Baha-001 dan Dalung-003 dan BOQ 2
 10     2-Oct-23      MANDIRI IDR       1220011559559   site MP 26 Bali dari PT DHJ ke WH Serpong                    495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses Swap Pole MCP Tenant XL dari PT
 11     2-Oct-23      MANDIRI IDR       1220011559559   CCSI ke PT SMS                                               743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses Sunter Agung-037 Priority XL dari
 12     2-Oct-23      MANDIRI IDR       1220011559559   PT CCSI ke PT Aliansi Inovasi Global                         743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses Veteran MP Proteksi BB dari WH
                                                        Serpong ke Office Semarang dan CV Ekasindo Energi
 13     2-Oct-23      MANDIRI IDR       1220011559559   Doa                                                        5,648,700    5,700,000       62,700        114,000         5,648,700
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari WH Serpong ke WH Cipulir dan
 14     2-Oct-23      MANDIRI IDR       1220011559559   Ruko Green Mansion                                           743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
 15     2-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                 495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Relokasi Jalan Kedoya Panjang to Jalan
 16     2-Oct-23      MANDIRI IDR       1220011559559   Panjang dari PT CCSI ke PT Manna Abadi Sejahtera             743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 24 Core dari PT CCSI ke WH
 17     2-Oct-23      MANDIRI IDR       1220011559559   Matraman                                                     743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 32 Core dari PT Prysmian Cable
 18     2-Oct-23      MANDIRI IDR       1220011559559   ke WH Matraman                                               594,600     600,000         6,600         12,000           594,600
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses MP Sunter Agung-001 dari PT CCSI
 19     2-Oct-23      MANDIRI IDR       1220011559559   ke Fajar Mitra Krida Abadi                                   743,250     750,000         8,250         15,000           743,250
Page 116
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 2
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                           NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                   BANK          DPP             PPN             PPh        NET DIBAYARKAN
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material ODC, Modular, Doorlock, Padlock dari WH
 20     2-Oct-23      MANDIRI IDR       1220011559559   Serpong ke WH Matraman                                      495,500     500,000           5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Angkur dari WH Serpong ke CV Ekasindo
 21     2-Oct-23      MANDIRI IDR       1220011559559   Energi Doa                                                1,684,700    1,700,000         18,700         34,000         1,684,700
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
 22     2-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                495,500     500,000           5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material dari WH Penjernihan ke WH Serpong &
 23     2-Oct-23      MANDIRI IDR       1220011559559   Office Semarang                                           2,427,950    2,450,000         26,950         49,000         2,427,950
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
 24     2-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman               495,500     500,000           5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Rectifier, Router, Switch Planet dari WH
 25     2-Oct-23      MANDIRI IDR       1220011559559   Serpong ke WH Penjernihan                                   495,500     500,000           5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Anchor, Plate Setting dari PT DHJ ke WH
 26     2-Oct-23      MANDIRI IDR       1220011559559   Serpong                                                     644,150     650,000           7,150         13,000           644,150
                                                        PURIAMPERA INTIPRATAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Ad Premier Periode Aug
 27     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                        260,269     257,692          28,346         25,769           260,269
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
 28     2-Oct-23      MANDIRI IDR       1220011559559   General 3 Lt.1 periode Aug 2023                             402,543     369,305          40,624          7,386           402,543
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
 29     2-Oct-23      MANDIRI IDR       1220011559559   General 4 Lt.2 periode Aug 2023                             266,564     244,554          26,901          4,891           266,564
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
 30     2-Oct-23      MANDIRI IDR       1220011559559   General 1 BSM periode Aug 2023                               98,139         90,035        9,904          1,800            98,139
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
 31     2-Oct-23      MANDIRI IDR       1220011559559   General 2 Lt.GF periode Aug 2023                            450,064     412,903          45,419          8,258           450,064
                                                        MULIA CEMERLANG DIAN PERSADA, PT , Biaya atas
 32     2-Oct-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Wisma GKBI periode Aug 2023            591,022     585,169          64,369         58,516           591,022
                                                        GRAHANIAGA TATAUTAMA, PT , Biaya atas
                                                        pemakaian Listrik di Gedung Graha Niaga Tatautama
 33     2-Oct-23      MANDIRI IDR       1220011559559   Periode 21/07/2023 - 20/08/2023                             232,658     230,354          25,339         23,035           232,658
                                                        SERPONG CIPTA KREASI, PT , Biaya atas Pemakaian
                                                        Listrik di Plaza Summarecon Serpong periode Aug
 34     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                      1,009,401     999,406         109,935         99,940         1,009,401
                                                        PUALAM KENCANA GEMILANG JAKARTA, PT , Biaya
                                                        atas Pemakaian Listrik di Gedung Perwata Tower
 35     2-Oct-23      MANDIRI IDR       1220011559559   periode 26 Jul 2023 - 25 Aug 2023                           613,811     607,734          66,850         60,773           613,811
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Nov
 36     2-Oct-23      MANDIRI IDR       1220011559559   2022                                                        225,900     251,000             -           25,100           225,900
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Aug
 37     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                        272,700     270,000          29,700         27,000           272,700
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Jan
 38     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                        235,800     262,000             -           26,200           235,800
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Feb
 39     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                        243,000     270,000             -           27,000           243,000
Page 117
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 3
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                       BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Mar
 40     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                            225,900     251,000             -           25,100            225,900
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Dec
 41     2-Oct-23      MANDIRI IDR       1220011559559   2022                                                            232,200     258,000             -           25,800            232,200
                                                        NICO CENTRAL, PT , Biaya atas Pemakaian Listrik di
 42     2-Oct-23      MANDIRI IDR       1220011559559   Gedung Sona Topas Tower Periode Aug 2023                        347,692     344,250          37,867         34,425            347,692
                                                        SAINATH REALINDO, PT , Biaya atas Pemakaian Listrik
 43     2-Oct-23      MANDIRI IDR       1220011559559   di Gedung Sainath Tower periode Aug 2023                         83,679         92,976          -            9,297             83,679
                                                        KHARISMA INTAN PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Scientia Business Park periode
 44     2-Oct-23      MANDIRI IDR       1220011559559   Aug 2023                                                        183,323     181,507          19,966         18,150            183,323
                                                        BUMI MULIA PERKASA DEVELOPMENT, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Atrium Mulia periode
 45     2-Oct-23      MANDIRI IDR       1220011559559   Aug 2023                                                        232,423     230,122          25,313         23,012            232,423
                                                        PERHIMPUNAN PENGHUNI GRAHA IRAMA , Biaya atas
                                                        Pemakaian Listrik di Gedung Graha Irama periode 01
 46     2-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 01 Sep 2023                                          130,185     144,649             -           14,464            130,185
                                                        DWIBINA PRIMA, PT , Biaya atas Pemakaian Listrik di
 47     2-Oct-23      MANDIRI IDR       1220011559559   Wisma BSG periode Aug 2023                                      100,109         99,118       10,902          9,911            100,109
                                                        BALI UTAMA CAKRAWALA, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Discovery Shopping Mall Periode 29
 48     2-Oct-23      MANDIRI IDR       1220011559559   Jul 2023 - 28 Aug 2023                                          167,492     165,835          18,240         16,583            167,492

                                                        PERHIMPUNAN PENGHUNI WISMA STACO , Biaya atas
 49     2-Oct-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Wisma Staco periode Aug 2023               143,228     159,142             -           15,914            143,228

                                                        LIZA CHRISTINA GARMENT INDUSTRY, PT , Biaya atas
 50     2-Oct-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Unity Building periode Aug 2023            505,000     500,000          55,000         50,000            505,000
                                                        GRIYA MURIA KENCANA, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Prince Center periode 26 Jul 2023 -
 51     2-Oct-23      MANDIRI IDR       1220011559559   25 Aug 2023                                                     231,826     229,531          25,248         22,953            231,826
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
 52     2-Oct-23      MANDIRI IDR       1220011559559   periode 18 Jul 2022 - 17 Aug 2023                             1,314,865    1,460,961            -          146,096          1,314,865
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
 53     2-Oct-23      MANDIRI IDR       1220011559559   Periode 18 Jul 2022 - 17 Aug 2023                             2,572,646    2,858,495            -          285,849          2,572,646
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                        4/B.071 (Call Center) Periode 18 Jul 2022 - 17 Aug
 54     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                         12,156,872   13,507,635            -         1,350,763        12,156,872
                                                        DUNIA MAKMUR PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Plaza Summarecon Bekasi
 55     2-Oct-23      MANDIRI IDR       1220011559559   Periode Aug 2023                                                791,407     783,571          86,193         78,357            791,407
                                                        DUNIA MAKMUR PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Plaza Summarecon Bekasi
 56     2-Oct-23      MANDIRI IDR       1220011559559   Periode Jul 2023                                                784,706     776,936          85,463         77,693            784,706
                                                        TECHNOLOGY DATA INDONESIA, PT , Tagihan
                                                        Reimbursement Listrik Rack No. Summer 243 Periode
 57     2-Oct-23      MANDIRI IDR       1220011559559   Agust 2023                                                    5,341,000    4,900,000        539,000         98,000          5,341,000
                                                        TECHNOLOGY DATA INDONESIA, PT , Biaya Sewa Rack
                                                        Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
 58     2-Oct-23      MANDIRI IDR       1220011559559   Periode 1 s/d 30 Sept 2023                                    7,630,000    7,000,000        770,000        140,000          7,630,000
Page 118
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 4
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Sewa
                                                        Crossconnect Fiber Optic in Data Center CDCI - 1 Port
 59     2-Oct-23      MANDIRI IDR       1220011559559   REQ/21FEB19/00000008 periode Sept 2023                       1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Sewa
                                                        Crossconnect Fiber Optic in Data Center CDCI - 1 Port
                                                        REQ/23MAR20/00000008 Port 51 CID periode Sept
 60     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                         1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Biaya Sewa
                                                        Crossconnect Additional 3 Port FO di CDC periode
 61     2-Oct-23      MANDIRI IDR       1220011559559   Sept 2023                                                    4,905,000    4,500,000      495,000         90,000          4,905,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Sewa Full
 62     2-Oct-23      MANDIRI IDR       1220011559559   Rack Server Cabinet 45U periode Agust 2023                  10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Biaya Sewa
 63     2-Oct-23      MANDIRI IDR       1220011559559   Collocation IU OTB Fiber in NER periode Agust 2023           2,180,000    2,000,000      220,000         40,000          2,180,000

                                                        SMART MILENIUM EFFISIENSI, PT , Biaya Pemakaian
 64     2-Oct-23      MANDIRI IDR       1220011559559   Pulsa Telepon Pelanggan Corporate periode Jul 2023           2,079,724    1,873,626      206,098              -          2,079,724
                                                        QUIROS NETWORKS, PT , Biaya Pemakaian Telepon
 65     2-Oct-23      MANDIRI IDR       1220011559559   Call Center Bulan Agust 2023                                12,540,493   11,297,742    1,242,751              -         12,540,493
                                                        OMADATA PADMA INDONESIA, PT , Biaya Sewa
                                                        Management Cable - MMR 1U OTB Periode Sept 2023
 66     2-Oct-23      MANDIRI IDR       1220011559559   (Omadata)                                                    1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        OMADATA PADMA INDONESIA, PT , Biaya Sewa
                                                        Management Cable MMR 1U Open Rack Periode Sept
 67     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                         2,180,000    2,000,000      220,000         40,000          2,180,000
                                                        OMADATA PADMA INDONESIA, PT , Biaya Service
 68     2-Oct-23      MANDIRI IDR       1220011559559   Charge Sewa MMR periode Sept 2023                              327,000     300,000        33,000          6,000            327,000
                                                        INTERNETINDO DATA CENTRA INDONESIA, PT ,
                                                        Tagihan Kelebihan Pemakaian Listrik Rack No Winter
 69     2-Oct-23      MANDIRI IDR       1220011559559   233 Per 1 - 31 Agust 2023 (IDC Indonesia)                   11,445,000   10,500,000    1,155,000        210,000         11,445,000
                                                        INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                        Sinyal untuk Tenant di Gedung Living World Bali
 70     2-Oct-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Juli 2023                         9,098,271    8,196,641      901,630              -          9,098,271
                                                        INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                        Sinyal untuk Tenant di Gedung The Plaza Office Tower
 71     2-Oct-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Juli 2023                        98,149,033   88,422,552    9,726,481              -         98,149,033
                                                        WAHANA MULTI LOGISTIK, PT , Biaya Pengiriman
                                                        Material JC 96 & 24 Core, Battery ZTE, Box KWH dari
 72     2-Oct-23      MANDIRI IDR       1220011559559   WH Serpong ke Office Matraman                                  941,450     950,000        10,450         19,000            941,450
                                                        GEMILANG CATUR PERSADA, PT , Biaya Sewa Local
                                                        Loop 2 Gbps (Alcen) - Omadata Surabaya periode Sept
 73     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                        28,132,000   25,810,000    2,838,000        516,000         28,132,000
                                                        PRIMACOM INTERBUANA, PT , Sewa Local Loop 25
                                                        Mbps Diskominfo Kota Bandung CCTV sebanyak 54
 74     2-Oct-23      MANDIRI IDR       1220011559559   Titik periode Agust 2023                                    58,860,000   54,000,000    5,940,000       1,080,000        58,860,000
                                                        PRIMACOM INTERBUANA, PT , Sewa Local Loop
                                                        10Mbps Diskominfo Kota Bandung sebanyak 30 Site
 75     2-Oct-23      MANDIRI IDR       1220011559559   CCTV periode Agust 2023                                     26,160,000   24,000,000    2,640,000        480,000         26,160,000

                                                        PRIMACOM INTERBUANA, PT , Sewa Layanan Koneksi
                                                        Backhaul 1500Mbps Wisma Bumiputera (BBU) -
 76     2-Oct-23      MANDIRI IDR       1220011559559   Balitower Regional Jawa Barat periode Agust 2023             3,270,000    3,000,000      330,000         60,000          3,270,000
                                                        JEJARING ULTRA PRIMA, PT , Biaya Sewa Penempatan
                                                        Perangkat Telekomunikasi di Kawasan Summarecon
                                                        Corporate Berdasarkan Profit Sharing Januari - Maret
 77     2-Oct-23      MANDIRI IDR       1220011559559   2023                                                        90,279,189   89,385,335    9,832,387       8,938,533        90,279,189
Page 119
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 5
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                                NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        INTI ALGORITMA PERDANA, PT , Sewa Alat / kabel
                                                        Fiber Optic Pass Through PT Darya Varia Laboratoria
 78     2-Oct-23      MANDIRI IDR       1220011559559   periode Apr - Jun 2023                                        32,700,000    30,000,000    3,300,000        600,000         32,700,000
                                                        SMART TELECOM, PT , Internet Banndwith 4site
 79     2-Oct-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001173)                                     119,880,000   108,000,000   11,880,000              -        119,880,000
                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
 80     2-Oct-23      MANDIRI IDR       1220011559559   Jakarta - Bali 5 Gbps periode Sept 2023                       81,100,249    74,403,898    8,184,428       1,488,077        81,100,249
                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
 81     2-Oct-23      MANDIRI IDR       1220011559559   Jakarta - Bandung 500Mbps periode Sept 2023                    9,265,000     8,500,000      935,000        170,000          9,265,000
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
 82     2-Oct-23      MANDIRI IDR       1220011559559   periode 21 Jul 2023 - 20 Aug 2023                                215,843      213,706        23,507         21,370            215,843
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 29
 83     2-Oct-23      MANDIRI IDR       1220011559559   periode 21 Jul 2023 - 20 Aug 2023                                215,843      213,706        23,507         21,370            215,843
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 11
 84     2-Oct-23      MANDIRI IDR       1220011559559   periode 21 Jul 2023 - 20 Aug 2023                                230,560      228,277        25,110         22,827            230,560
                                                        PENGELOLA PUSAT BELANJA, PT , Biaya atas
                                                        Pemakaian Listrik di Mall Bassura periode 16 Jul 2023 -
 85     2-Oct-23      MANDIRI IDR       1220011559559   15 Aug 2023                                                      862,231      853,693        93,907         85,369            862,231
                                                        PPPSRS PERKANTORAN EKSEKUTIF SATRIO TOWER ,
                                                        Biaya atas Pemakaian Listrik di Gedung Satrio Tower
 86     2-Oct-23      MANDIRI IDR       1220011559559   periode Aug 2023                                                 259,192      256,626        28,228         25,662            259,192
                                                        PUSAT PENGELOLAAN KOMPLEK KEMAYORAN , Sewa
                                                        Penempatan Kabel FO di Jl. Angkasa - Jl. Silangit
                                                        Kawasan Kemayoran untuk Tenant Sainath periode 01
 87     2-Oct-23      MANDIRI IDR       1220011559559   Apr 2023 - 31 Mar 2024                                        26,180,240    23,586,000    2,594,240              -         26,180,240
                                                        RAJAWALI ADIWISMA, PT , Biaya atas Pemakaian
 88     2-Oct-23      MANDIRI IDR       1220011559559   Listrik di Menara Rajawali Periode Aug 2023                      191,305      189,411        20,835         18,941            191,305
                                                        MARKETING COMMUNICATION , Uang Muka Beban
                                                        Umum atas Biaya Popen Booth Apt. Springlake
 89     2-Oct-23      MANDIRI IDR       1220011559559   periode Oktober 2023 - Trf                                     1,313,000     1,313,000          -                -          1,313,000

                                                        BUMI SERPONG DAMAI, PT , Uang Muka Beban
                                                        Umum atas Biaya Open Booth Balifiber di Club House
 90     2-Oct-23      MANDIRI IDR       1220011559559   Bora - Bora ( GreenWich BSD City) - Oktober 2023 - Trf         1,260,000     1,260,000          -                -          1,260,000
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Pascabayar
                                                        Paket Data Mikrotik Regional Jawa Timur Periode
 91     2-Oct-23      MANDIRI IDR       1220011559559   September 2023                                                   582,750      525,000        57,750              -            582,750
                                                        MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                        Pemakaian Listrik Gedung Palma Tower lt. B.1 periode
 92     2-Oct-23      MANDIRI IDR       1220011559559   Aug 2023                                                         103,048      102,027        11,223         10,202            103,048
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material Panel ACPDB dari PT Surya Anugerah ke WH
 93     2-Oct-23      MANDIRI IDR       1220011559559   Bali                                                           3,468,500     3,500,000       38,500         70,000          3,468,500
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material MP26 dari PT Nobi Putra Angkasa ke WH Bali
 94     2-Oct-23      MANDIRI IDR       1220011559559   & PT Kesa Utama Sejahtera                                      7,135,200     7,200,000       79,200        144,000          7,135,200
                                                        BINTANG MAS UTAMA, CV , Biaya pembelian barang
                                                        kebutuhan stok team facility( Philips OBL-
                                                        Lamp,Master Lock dan Schneider MCP) (PO
 95     2-Oct-23      MANDIRI IDR       1220011559559   Rp.22.521.900,- PPN Rp.2.231.900,- )                          22,521,900    20,290,000    2,231,900              -         22,521,900

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 28 Okt
 96     2-Oct-23      MANDIRI IDR       1220011559559   2023 s.d 27 Okt 2024 - No. Aplikasi : 029443102016             7,463,098     7,463,098          -                -          7,463,098
Page 120
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 6
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP            PPN             PPh         NET DIBAYARKAN

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 28 Okt
 97     2-Oct-23      MANDIRI IDR       1220011559559   2023 s.d 27 Okt 2024 - No. Aplikasi : 029441102016           7,463,098     7,463,098          -                -          7,463,098

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 28 Okt
 98     2-Oct-23      MANDIRI IDR       1220011559559   2023 s.d 27 Okt 2024 - No. Aplikasi : 029442102016           7,463,098     7,463,098          -                -          7,463,098

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 28 Okt
 99     2-Oct-23      MANDIRI IDR       1220011559559   2023 s.d 27 Okt 2024 - No. Aplikasi : 029440102016           7,463,098     7,463,098          -                -          7,463,098
                                                        TELCO ABADI JAYA, PT , Pembelian Tool Box ST-
100     2-Oct-23      MANDIRI IDR       1220011559559   TBI069 Tekiro Sebanyak 1 Pcs                                   188,700      170,000        18,700              -            188,700

                                                        FTTX PLANNING , Uang Muka Beban Umum atas
                                                        Pembayaran Biaya Pajak Pengiriman (PIB) Pengadaan
                                                        Switch Planet [IGS-4215-8P2T2S] 300 Unit dari Taiwan-
101     4-Oct-23      MANDIRI IDR       1220011559559   JKT [PO No 1010037458] - PR : 1010035170 - Trf             159,175,000   159,175,000          -                -        159,175,000
                                                        DPO FPU , Biaya Pembelian rangka Smart Pole dan
102     4-Oct-23      MANDIRI IDR       1220011559559   Pengiriman                                                   2,925,000     2,925,000          -                -          2,925,000
                                                        DPO FPU , Biaya Cetak Flyer Residential periode
103     4-Oct-23      MANDIRI IDR       1220011559559   September 2023                                                 718,234      718,234           -                -            718,234
                                                        TOKOPEDIA, PT , Biaya pembelian material untuk
104     4-Oct-23      MANDIRI IDR       1220011559559   kebutuhan smartpole                                          2,136,900     2,136,900          -                -          2,136,900
                                                        PLN PERSERO, PT , Biaya Pembelian Token Listrik site
                                                        Jagalan-009 Tenant IOH Periode September 2023
105     4-Oct-23      MANDIRI IDR       1220011559559   Region Jawa Tengah                                             202,500      202,500           -                -            202,500
                                                        PLN PERSERO, PT , Biaya pembelian Pembelian Token
106     4-Oct-23      MANDIRI IDR       1220011559559   Listrik Site MP-Daeng Mohamad Ardiwinata                       104,250      104,250           -                -            104,250
                                                        PLN PERSERO, PT , Biaya Pembelian Token KWH Listrik
                                                        site Jagalan-009 Tenant IOH Periode September 2023
107     4-Oct-23      MANDIRI IDR       1220011559559   Region Jawa Tengah                                             405,000      405,000           -                -            405,000
                                                        WAHANARIA CEMERLANG, PT , Biaya Listrik di Hotel
                                                        Ibis Styles Yogyakarta Lantai 6 site Sosromenduran
108     5-Oct-23      MANDIRI IDR       1220011559559   002 periode Agustus 2023                                     2,600,813     2,889,792          -          288,979          2,600,813
                                                        TEKNOVATUS SOLUSI SEJAHTERA, PT , Biaya Sewa
                                                        MMR Connect Equipment Rack to OTB periode Juni
109     5-Oct-23      MANDIRI IDR       1220011559559   2023 - Mei 2024                                              3,270,000     3,000,000      330,000         60,000          3,270,000
                                                        TRANS INDONESIA SUPERKORIDOR, PT , Sewa
                                                        Intercity IDC Duren Tiga - RK0004 Office Gatot
110     5-Oct-23      MANDIRI IDR       1220011559559   Subroto periode 01 - 31 Agust 2023                           9,265,000     8,500,000      935,000        170,000          9,265,000
                                                        TRANS INDONESIA SUPERKORIDOR, PT , Biaya Sewa
                                                        Intercity Jakarta - Diskominfo Cirebon 500Mbps
111     5-Oct-23      MANDIRI IDR       1220011559559   periode 01 - 31 Agust 2023                                   9,072,288     8,323,200      915,552        166,464          9,072,288
                                                        SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                        Dedicated dan Broadband West BSD untuk 47 Tenant
112     5-Oct-23      MANDIRI IDR       1220011559559   periode Jun 2023                                            66,117,947    60,658,667    6,672,453       1,213,173        66,117,947
                                                        BINTANG SEMPURNA, PT , Pembelian Spanduk 17
                                                        Agustus Sebanyak 1 Pcs, Baliho 17 Agustus Sebanyak
113     5-Oct-23      MANDIRI IDR       1220011559559   1 Pcs                                                          626,750      575,000        63,250         11,500            626,750
                                                        BINTANG SEMPURNA, PT , Pembelian Flyer Nokia
114     5-Oct-23      MANDIRI IDR       1220011559559   Beacon 2 Sebanyak 1.000 Pcs                                  2,398,000     2,200,000      242,000         44,000          2,398,000
                                                        BINTANG SEMPURNA, PT , Pembelian Flyer Nokia
                                                        Beacon 2 Reseller Sebanyak 1.000 Pcs, Flyer Nokia
115     5-Oct-23      MANDIRI IDR       1220011559559   Beacon 2 Sales Sebanyak 1.000 Pcs                            3,597,000     3,300,000      363,000         66,000          3,597,000

                                                        SIDO AGUNG MANDIRI, PT , Pembelian Patchcord
                                                        FC/UPC-LC/UPC SM Duplex 5 Mtr Sebanyak 20
116     5-Oct-23      MANDIRI IDR       1220011559559   Pcs,FC/UPC-SC/UPC SM Duplex 5 Mtr Sebanyak 20 Pcs            1,243,200     1,120,000      123,200              -          1,243,200
Page 121
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 7
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh        NET DIBAYARKAN
                                                        SIDO AGUNG MANDIRI, PT , Pembelian Patchcord
117     5-Oct-23      MANDIRI IDR       1220011559559   LC/UPC-SC/UPC SM Duplex 5 Mtr Sebanyak 10 Pcs                   310,800     280,000        30,800              -           310,800
                                                        WAHANA MULTI LOGISTIK, PT , Biaya Pengiriman
                                                        Material Kabel dari PT Furukawa ke PT Sembilan belas
118     5-Oct-23      MANDIRI IDR       1220011559559   Multi Usaha                                                   1,025,685    1,035,000       11,385         20,700         1,025,685
                                                        WAHANA MULTI LOGISTIK, PT , Biaya Pengiriman
                                                        Material Kabel dari PT Furukawa ke PT Mahaga
119     5-Oct-23      MANDIRI IDR       1220011559559   Pratama                                                       1,025,685    1,035,000       11,385         20,700         1,025,685
                                                        WAHANA MULTI LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 32 Core dari WH Serpong ke PT
120     5-Oct-23      MANDIRI IDR       1220011559559   Santa Multi Semesta                                             941,450     950,000        10,450         19,000           941,450

                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
121     5-Oct-23      MANDIRI IDR       1220011559559   Material Mini OLT dari WH Serpong ke WH Matraman                495,500     500,000         5,500         10,000           495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material FO Relokasi Non SJUT dari PT Prysmian Cable
122     5-Oct-23      MANDIRI IDR       1220011559559   ke PT Malaka Karya Utama                                        594,600     600,000         6,600         12,000           594,600
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Rectifier, JC, Wire Rope dari WH Serpong ke
123     5-Oct-23      MANDIRI IDR       1220011559559   WH Matraman                                                     495,500     500,000         5,500         10,000           495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Router, SFP, Wire Rope dari WH Serpong ke
124     5-Oct-23      MANDIRI IDR       1220011559559   WH Penjernihan                                                  495,500     500,000         5,500         10,000           495,500
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Cable Optical dari PT Furukawa ke WH
125     5-Oct-23      MANDIRI IDR       1220011559559   Serpong                                                       2,398,000    2,200,000      242,000         44,000         2,398,000
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Kabel ADSS 32 & 96 Core dari PT CCSI ke PT
126     5-Oct-23      MANDIRI IDR       1220011559559   Dinamikon Inovasi Teknologi                                   1,716,750    1,575,000      173,250         31,500         1,716,750
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Subduct HDPE dari PT Alpha Cikupa Makmur
127     5-Oct-23      MANDIRI IDR       1220011559559   ke WH Matraman                                                1,035,500     950,000       104,500         19,000         1,035,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Switch, SFP, CCTV dari WH Serpong ke WH
128     5-Oct-23      MANDIRI IDR       1220011559559   Penjernihan                                                     495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari WH Serpong ke WH Matraman
129     5-Oct-23      MANDIRI IDR       1220011559559   dan WH Cipulir                                                  743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Relokasi Batch 5 dari PT CCSI ke PT Sentra
130     5-Oct-23      MANDIRI IDR       1220011559559   Indo Telemedia                                                  743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Battery Lithium 48V 100AH dari WH Serpong
131     5-Oct-23      MANDIRI IDR       1220011559559   ke Office Matraman                                              644,150     650,000         7,150         13,000           644,150
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Battery Lithium 48V 100AH dari WH Serpong
132     5-Oct-23      MANDIRI IDR       1220011559559   ke Office Matraman                                              644,150     650,000         7,150         13,000           644,150
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari PT Furukawa ke PT Simetrik
133     5-Oct-23      MANDIRI IDR       1220011559559   Integrasi                                                       495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material JC 48&96 Core, Battery Lithium 48V 100AH
134     5-Oct-23      MANDIRI IDR       1220011559559   dari WH Serpong ke Office Matraman                            1,288,300    1,300,000       14,300         26,000         1,288,300
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari WH Serpong ke WH Cipulir dan
135     5-Oct-23      MANDIRI IDR       1220011559559   Green Mansion                                                   743,250     750,000         8,250         15,000           743,250
Page 122
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 8
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari WH Serpong ke WH
136     5-Oct-23      MANDIRI IDR       1220011559559   Matraman                                                        495,500      500,000         5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari PT CCSI ke WH
137     5-Oct-23      MANDIRI IDR       1220011559559   Matraman                                                        743,250      750,000         8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Battery, Wire Rope, Rectifier dari WH
138     5-Oct-23      MANDIRI IDR       1220011559559   Serpong ke Office Penjernihan                                   495,500      500,000         5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
139     5-Oct-23      MANDIRI IDR       1220011559559   Material ONT dari WH Serpong ke WH Cipulir                      991,000     1,000,000       11,000         20,000            991,000
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari PT CCSI ke WH
140     5-Oct-23      MANDIRI IDR       1220011559559   Matraman                                                        743,250      750,000         8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Battery Lithium 48V 100AH dari WH Serpong
141     5-Oct-23      MANDIRI IDR       1220011559559   ke Office Matraman                                              644,150      650,000         7,150         13,000            644,150
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Rectifier 3000W 3 Phase ZTE dari WH
142     5-Oct-23      MANDIRI IDR       1220011559559   Serpong ke Office Matraman                                      644,150      650,000         7,150         13,000            644,150
                                                        LINK NET TBK, PT , Link Net IDC D3 Jakarta to NIX Bali
143     5-Oct-23      MANDIRI IDR       1220011559559   B00573-009 10Gbps periode Sept 2023                         196,727,419   180,483,871   19,853,225       3,609,677       196,727,419
                                                        DANAMAS INSAN KREASI ANDALAN, PT ,
                                                        Reimbursement Salary Outsource Div. Direct Sales
144     5-Oct-23      MANDIRI IDR       1220011559559   Periode Agust 2023 dan Insentif Periode Jul 2023            109,618,489   108,892,538      887,273        161,322        109,618,489
                                                        MEGA AKSES PERSADA, PT , Sewa Jabalink IPLC
                                                        Jakarta - Singapore (Fiberstar) 30 Gbps Periode Sept
145     5-Oct-23      MANDIRI IDR       1220011559559   2023                                                        332,450,000   305,000,000   33,550,000       6,100,000       332,450,000
                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
146     5-Oct-23      MANDIRI IDR       1220011559559   Diskominfo Cirebon 500Mbps periode Sept 2023                  8,720,000     8,000,000      880,000        160,000          8,720,000

                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
                                                        3Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
147     5-Oct-23      MANDIRI IDR       1220011559559   Surabaya Omadata Center periode Sept 2023                    32,700,000    30,000,000    3,300,000        600,000         32,700,000
                                                        DJAJA LISTRIK, PT , Pembelian Lap Handuk Kecil
                                                        30x30cm Sebanyak 20 Pcs, Battery Camera Canon
148     5-Oct-23      MANDIRI IDR       1220011559559   IXUS 185 NB11L Sebanyak 1 Pcs,dll                             5,780,880     5,208,000      572,880              -          5,780,880
                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                        Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                        dan Monopole Triwulan IV/2023 Periode Oct-Dec
149     5-Oct-23      MANDIRI IDR       1220011559559   2023 - PPN1                                                   8,546,506           -      8,546,506              -          8,546,506
                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                        Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                        dan Monopole Triwulan IV/2023 Periode Oct-Dec
150     5-Oct-23      MANDIRI IDR       1220011559559   2023 - PPN                                                   61,861,888           -     61,861,888              -         61,861,888
                                                        INDOSAT TBK, PT , Biaya Sewa Domestic Ethernet Link
                                                        (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6 Jakarta
151     6-Oct-23      MANDIRI IDR       1220011559559   periode Sept 2023                                           114,460,000   105,010,000   11,550,000       2,100,000       114,460,000
                                                        PLN PERSERO, PT , Biaya Tagihan KWH PLN Pasca
152     6-Oct-23      MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode Oketober 2023                7,902,409     7,902,409          -                -          7,902,409
                                                        PLN PERSERO, PT , Biaya PLN Auto Debet Region Jawa
153     6-Oct-23      MANDIRI IDR       1220011559559   Barat Periode Oktober 2023                                      257,600      257,600           -                -            257,600
                                                        MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                        Pemakaian Listrik Gedung Palma Tower lt. 11 periode
154     6-Oct-23      MANDIRI IDR       1220011559559   Aug 2023                                                        103,048      102,027        11,223         10,202            103,048
                                                        PLN PERSERO, PT , Biaya pembelian token PLN 16 site
155     6-Oct-23      SINARMAS IDR       0002999994     KWH prabayar pemakaian bulan Oktober 2023                    21,962,500    21,962,500          -                -         21,962,500
Page 123
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 9
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site 751224 Kuta_027 (PO
                                                        Rp.1.538.461.000,-Potongan PPh 21( 2.5%)
156     6-Oct-23      SINARMAS IDR       0002999994     Rp.38.461,-)                                                 1,500,000    1,538,461          -           38,461          1,500,000
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya Sewa
                                                        Penempatan Perangkat Telekomunikasi di Gedung
                                                        Landmark Pluit Berdasarkan Revenue Sharing periode
157     9-Oct-23      MANDIRI IDR       1220011559559   April - Juni 2023                                           17,161,920   16,992,000    1,869,120       1,699,200        17,161,920
                                                        MENARA PRAMBANAN, PT , Tagihan Sharing Revenue
                                                        Bali Fiber di Apartement Poins Square periode April -
158     10-Oct-23     MANDIRI IDR       1220011559559   Juni 2023                                                    1,523,878    1,508,790      165,967        150,879          1,523,878
                                                        MENARA PRAMBANAN, PT , Tagihan Sharing Revenue
                                                        Bali Fiber di Mall Poins Square periode April - Juni
159     10-Oct-23     MANDIRI IDR       1220011559559   2023                                                           767,432     759,833        83,582         75,983            767,432
                                                        NUSA KIRANA REAL ESTATE, PT , Biaya Sewa
                                                        Penempatan Perangkat Telekomunikasi di Gedung
                                                        Kirana Boutique Berdasarkan Penggunaan Jaringan
160     10-Oct-23     MANDIRI IDR       1220011559559   Internet periode Januari - Maret 2023                        9,857,274    9,759,677    1,073,564        975,967          9,857,274
                                                        SUKA DUKA GIRI HILL , Biaya Management Fee atas
                                                        Revenue Sharing periode Agustus 2023 di Suka Duka
161     10-Oct-23     MANDIRI IDR       1220011559559   Raya Hill - Perumahan Giri Hill                              2,441,928    2,543,674          -          101,746          2,441,928
                                                        CENTRA SARANA DATA, PT , Tagihan Revenue Sharing
                                                        Bali Fiber di Gedung UOB Plaza (Chubb Square)
162     10-Oct-23     MANDIRI IDR       1220011559559   periode April - Juni 2023                                    8,677,127    7,960,667      875,673        159,213          8,677,127
                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian Joint
163     10-Oct-23     MANDIRI IDR       1220011559559   Closure 96 Core Paz LKP (M) Sebanyak 40 Unit                23,310,000   21,000,000    2,310,000              -         23,310,000
                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian Joint
                                                        Closure 96 Core untuk Kebutuhan Troubleshoot
164     10-Oct-23     MANDIRI IDR       1220011559559   Sebanyak 50 Unit                                            29,137,500   26,250,000    2,887,500              -         29,137,500
                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian Slack
                                                        80x80cm Sebanyak 50 Unit, Bracket Dead End Noise
165     10-Oct-23     MANDIRI IDR       1220011559559   D25 50MM 24 Core Sebanyak 60 Unit                            8,880,000    8,000,000      880,000              -          8,880,000

                                                        MONETI INDO TEKNO, PT , Pembelian Adaptor CCTV +
166     10-Oct-23     MANDIRI IDR       1220011559559   Kabel Cumi Adaptor 12V 6A Sebanyak 75 Pcs                    7,492,500    6,750,000      742,500              -          7,492,500
                                                        MONETI INDO TEKNO, PT , Pembelian Cleaner Pen
                                                        Optic LC Sebanyak 20 Unit, LVA Project/ Operation
167     10-Oct-23     MANDIRI IDR       1220011559559   Sebanyak 10 Pcs                                              2,331,000    2,100,000      231,000              -          2,331,000
                                                        MONETI INDO TEKNO, PT , Pembelian POE Splitter
                                                        Male to Female 2 In 1 50 Pcs, Optic Fiber E501
168     10-Oct-23     MANDIRI IDR       1220011559559   Pollykote 400ml 5 Pcs, dll                                   4,812,960    4,336,000      476,960              -          4,812,960
                                                        MONETI INDO TEKNO, PT , Pembelian Cable Ties
                                                        Mount 20x20mm Sebanyak 100 Pack, Kabel Converter
169     10-Oct-23     MANDIRI IDR       1220011559559   TypeA-DB9 Sebanyak 4 Pcs                                     3,163,500    2,850,000      313,500              -          3,163,500
                                                        ISMAWA TRIMITRA, PT , Biaya open booth Balifiber di
170     10-Oct-23     MANDIRI IDR       1220011559559   Graha Iskandarsyah tgl 22 September 2023                       757,500     750,000        82,500         75,000            757,500
                                                        PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
171     10-Oct-23     MANDIRI IDR       1220011559559   Pluit LG-04 periode Aug 2022 - Jul 2023                      6,356,942    6,356,942          -                -          6,356,942
                                                        PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
172     10-Oct-23     MANDIRI IDR       1220011559559   Pluit B/10 periode Aug 2023                                    316,296     316,296           -                -            316,296
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-B) periode 16
173     10-Oct-23     MANDIRI IDR       1220011559559   Juli 2023 - 15 Agustus 2023                                    136,487     135,136        14,864         13,513            136,487
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-D) periode 16
174     10-Oct-23     MANDIRI IDR       1220011559559   Juni 2023 - 15 Juli 2023                                       121,223     120,023        13,202         12,002            121,223
Page 124
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 10
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-A) periode 16
175     10-Oct-23     MANDIRI IDR       1220011559559   Juli 2023 - 15 Agustus 2023                                     160,451      158,863        17,474         15,886            160,451
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-D) periode 16
176     10-Oct-23     MANDIRI IDR       1220011559559   Juli 2023 - 15 Agustus 2023                                     124,428      123,196        13,551         12,319            124,428
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-E) periode 16
177     10-Oct-23     MANDIRI IDR       1220011559559   Juli 2023 - 15 Agustus 2023                                     169,915      168,233        18,505         16,823            169,915
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-A) periode 16
178     10-Oct-23     MANDIRI IDR       1220011559559   Juni 2023 - 15 Juli 2023                                        153,277      151,759        16,693         15,175            153,277
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-B) periode 16
179     10-Oct-23     MANDIRI IDR       1220011559559   Juni 2023 - 15 Juli 2023                                        132,059      130,752        14,382         13,075            132,059
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-E) periode 16
180     10-Oct-23     MANDIRI IDR       1220011559559   Juni 2023 - 15 Juli 2023                                        149,004      147,528        16,228         14,752            149,004
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Apr
181     10-Oct-23     MANDIRI IDR       1220011559559   2023                                                            225,900      251,000           -           25,100            225,900

                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
182     10-Oct-23     MANDIRI IDR       1220011559559   Pemakaian Listrik di Graha Samudera Periode Jul 2023            253,510      251,000        27,610         25,100            253,510
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode May
183     10-Oct-23     MANDIRI IDR       1220011559559   2023                                                            266,400      296,000           -           29,600            266,400
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Jun
184     10-Oct-23     MANDIRI IDR       1220011559559   2023                                                            225,900      251,000           -           25,100            225,900
                                                        XL AXIATA TBK, PT , Biaya Tagihan Pasca Bayar
                                                        Pembelian Pulsa XL Mikrotik (Monitoring NOC)
                                                        Periode September 2023 (Pemakaian Agustus 2023-
185     10-Oct-23     MANDIRI IDR       1220011559559   Jabodetabek Area (10 Site)                                    1,010,100      910,000       100,100              -          1,010,100
                                                        JEJARING ULTRA PRIMA, PT , Biaya Sewa Penempatan
                                                        Perangkat Telekomunikasi di Kawasan Summarecon
                                                        Residential Berdasarkan Profit Sharing Januari - Maret
186     10-Oct-23     MANDIRI IDR       1220011559559   2023                                                        150,716,794   149,224,548   16,414,700      14,922,454       150,716,794
                                                        DIAN MUSTIKA AGUNG, PT , Pembelian Perkakas
                                                        Tangan Tang Potong Tali Baja 36 Inch untuk
                                                        Pengadaan Tools Operation Region Jawa Tengah
187     10-Oct-23     MANDIRI IDR       1220011559559   Sebanyak 3 Unit                                               1,596,735     1,438,500      158,235              -          1,596,735
                                                        BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
                                                        Material Monopole 21M dan Accessories dari PT DHJ
188    10-Oct-23      MANDIRI IDR       1220011559559   ke WH Bali                                                   14,022,650    14,150,000      155,650        283,000         14,022,650
                                                        BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
                                                        Material Monopole 21M dan Accessories dari PT DHJ
189    10-Oct-23      MANDIRI IDR       1220011559559   ke WH Bali                                                   14,914,550    15,050,000      165,550        301,000         14,914,550
                                                        MONETI INDO TEKNO, PT , Pembelian Adaptor Power
                                                        Supply AC to DC 12V 2A Sebanyak 80 Pcs, Fiber
190    10-Oct-23      MANDIRI IDR       1220011559559   Protection Round Cable Sebanyak 200 Pcs                       3,196,800     2,880,000      316,800              -          3,196,800

                                                        MONETI INDO TEKNO, PT , Pembelian Tang Kombinasi
                                                        20cm Sebanyak 1 Pcs, Tang Potong 17cm Sebanyak 1
191    10-Oct-23      MANDIRI IDR       1220011559559   Pcs, Tang Cucut 6 Inch 20cm Sebanyak 1 Pcs, dll               1,593,960     1,436,000      157,960              -          1,593,960
Page 125
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                            Page 11
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                            NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                     BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        DIAN MUSTIKA AGUNG, PT , Pembelian Cable
                                                        Network STP Cat 5E Belden Sebanyak 915 MTR, Paint
192    10-Oct-23      MANDIRI IDR       1220011559559   Brush 2.5 Inch Sebanyak 5 pcs                             21,278,700    19,170,000    2,108,700              -         21,278,700
                                                        FPU PENJAGA SITE , Pembayaran penjaga site dan
                                                        uang canang bulan September 2023 di 65 site BTS trf
193    10-Oct-23      MANDIRI IDR       1220011559559   Bank Sinarmas                                             38,200,000    38,200,000          -                -         38,200,000
                                                        BERCA HARDAYAPERKASA, PT , Pembelian SFP 1G
                                                        40KM Sebanyak 15 Unit untuk Kebutuhan Stock
194     11-Oct-23     MANDIRI IDR       1220011559559   Corrective Celullar Operation Sebanyak 15 Unit             4,923,387     4,435,484      487,903              -          4,923,387
                                                        BERCA HARDAYAPERKASA, PT , Pembelian Ezviz EB8
                                                        4G 2K Smart Home IP Camera Outdoor CCTV Sebanyak
195    11-Oct-23      MANDIRI IDR       1220011559559   1 LUMPSUM                                                  2,434,785     2,193,500      241,285              -          2,434,785
                                                        TOWER OPERATION , Uang Muka Beban Umum atas
                                                        FPU Biaya Penetapan Tagihan Susulan P2TL Site
196    11-Oct-23      MANDIRI IDR       1220011559559   705482 Lebak Bulus-032 - Trf                                 396,717      396,717           -                -            396,717
                                                        TOWER OPERATION , Uang Muka Beban Umum atas
                                                        FPU Biaya Pembelian Top Up Kuota XL Mikrotik
                                                        Monitoring NOC Periode Pemakaian Untuk November
197    11-Oct-23      MANDIRI IDR       1220011559559   2023 - Trf                                                   314,500      314,500           -                -            314,500
                                                        TOWER OPERATION , Uang Muka Beban Umum atas
                                                        FPU Biaya Geser Kwh Meter Site 702998 Jembatan
198    11-Oct-23      MANDIRI IDR       1220011559559   Lima-008 - Trf                                               212,200      212,200           -                -            212,200
                                                        PPPSRS CBD PLUIT , Biaya IPL dan Sinking Fund CBD
                                                        Pluit Sesuai PKS 003/PSM-PPPSRS/CBD/IV/2022
199    11-Oct-23      MANDIRI IDR       1220011559559   periode 01 Agust 2022 - 31 Jan 2023                          737,748      819,720           -           81,972            737,748
                                                        PPPSRS CBD PLUIT , Biaya IPL dan Sinking Fund CBD
                                                        Pluit sesuai PKS 004/PSM-PPPSRS/CBD/IV/2022
200    11-Oct-23      MANDIRI IDR       1220011559559   periode 01 Agust 2022 - 31 Jul 2023                        1,242,000     1,380,000          -          138,000          1,242,000
                                                        PPPSRS CBD PLUIT , Sewa Area Basement Papyrus
                                                        (B/10) CBD Pluit Sesuai PKS 004/PSM-
                                                        PPPSRS/CBD/IV/2022 periode 01 Agust 2022 - 31 Jul
201    11-Oct-23      MANDIRI IDR       1220011559559   2023                                                      16,200,000    18,000,000          -         1,800,000        16,200,000
                                                        PPPSRS CBD PLUIT , Sewa Area Basement Akasia
                                                        (LG/04) CBD Pluit Sesuai PKS 003/PSM-
                                                        PPPSRS/CBD/IV/2022 periode 01 Agust 2022 - 31 Jan
202    11-Oct-23      MANDIRI IDR       1220011559559   2023                                                      12,150,000    13,500,000          -         1,350,000        12,150,000
                                                        BERCA HARDAYAPERKASA, PT , Pembelian Mikrotik
203    11-Oct-23      MANDIRI IDR       1220011559559   5SHPN - 52 AC Sebanyak 4 Unit                              8,305,411     7,482,353      823,058              -          8,305,411
                                                        SMART TELECOM, PT , Internet Banndwith 11site
204    12-Oct-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001151)                                 174,945,080   157,608,180   17,336,900              -        174,945,080
                                                        SMART TELECOM, PT , Internet Banndwith 3site
205    12-Oct-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001157)                                  66,152,099    59,596,486    6,555,613              -         66,152,099
                                                        SMART TELECOM, PT , Internet Banndwith 5site
206    12-Oct-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001152)                                  13,153,500    11,850,000    1,303,500              -         13,153,500
                                                        PLN PERSERO, PT , Biaya pembelian pulsa prabayar
207    12-Oct-23      SINARMAS IDR       0002999994     site baru Kerobokan Kelod 024 dan Jimbaran 002             3,612,500     3,612,500          -                -          3,612,500
                                                        SINAR JAYA TEKNIK , Penyelesaian untuk Pelunasan
                                                        50% untuk biaya Kalibrasi Boschpump Genset 40 KVA
                                                        Gardu F Area ITDC Nusa Dua(PO Rp.3.650.000,-
208    12-Oct-23      SINARMAS IDR       0002999994     Potongan PPh 21(2.5%) Rp.45.625,-)                         1,779,375     1,825,000          -           45,625          1,779,375
                                                        PLN PERSERO, PT , Biaya pembelian pulsa prabayar
                                                        site baru HO Kedonganan-006, Kuta-026 dan Dalung-
209    12-Oct-23      SINARMAS IDR       0002999994     003                                                       10,530,000    10,530,000          -                -         10,530,000
                                                        MENARA DUTA, PT , Biaya atas Pemakaian Listrik
210    13-Oct-23      MANDIRI IDR       1220011559559   Menara Duta Periode Aug 2023                                 130,594      129,301        14,223         12,930            130,594
Page 126
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 12
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                            NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                    BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        PETARUNG TANGGUH PERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di Mal Bali Galeria periode Aug
211    13-Oct-23      MANDIRI IDR       1220011559559   2023                                                         599,426     593,491        65,284         59,349            599,426
                                                        MENARA THAMRIN, PT , Biaya atas Pemakaian Listrik
                                                        di Gedung Menara Thamrin Suite 21 & 6 periode Aug
212    13-Oct-23      MANDIRI IDR       1220011559559   2023                                                         243,489     241,078        26,518         24,107            243,489
                                                        WIJAYA KARYA REALTY, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Tamansari Parama Periode 01 Aug
213    13-Oct-23      MANDIRI IDR       1220011559559   2023 - 31 Aug 2023                                         1,206,697    1,231,323          -           24,626          1,206,697
                                                        ARYAVENTURA REALTY, PT , Biaya atas Pemakaian
214    13-Oct-23      MANDIRI IDR       1220011559559   Listrik di Gedung Aryaventura periode Aug 2023               218,443     216,281        23,790         21,628            218,443
                                                        INTILAND DEVELOPMENT TBK, PT (JAKARTA) , Biaya
                                                        atas Pemakaian Listrik di Gedung Intiland Jakarta
215    13-Oct-23      MANDIRI IDR       1220011559559   periode 26 Jun 2023 - 25 Jul 2023                            613,430     607,356        66,809         60,735            613,430
                                                        INTILAND DEVELOPMENT TBK, PT (JAKARTA) , Biaya
                                                        atas Pemakaian Listrik di Gedung Intiland Jakarta
216    13-Oct-23      MANDIRI IDR       1220011559559   periode 26 Jul 2023 - 25 Aug 2023                            608,724     602,696        66,297         60,269            608,724

                                                        INTILAND DEVELOPMENT TBK, PT (SURABAYA) , Sewa
                                                        Penempatan Perangkat Telekomunikasi Server MMR
217    13-Oct-23      MANDIRI IDR       1220011559559   B1 di Gedung Intiland periode Sept 2023                    4,040,000    4,000,000      440,000        400,000          4,040,000

                                                        INTILAND DEVELOPMENT TBK, PT (SURABAYA) , Sewa
                                                        Penempatan Perangkat Telekomunikasi Server MMR
218    13-Oct-23      MANDIRI IDR       1220011559559   B1 di Gedung Intiland periode Agust 2023                   4,040,000    4,000,000      440,000        400,000          4,040,000
                                                        INTILAND DEVELOPMENT TBK, PT (SURABAYA) , Biaya
                                                        atas Pemakaian Listrik di Gedung Intiland Surabaya
219    13-Oct-23      MANDIRI IDR       1220011559559   periode Aug 2023                                             867,938     859,344        94,528         85,934            867,938
                                                        MEKAR PRANA INDAH, PT , Sewa Penempatan
                                                        Perangkat di Gedung Menara Bidakara 2 periode 01
220    13-Oct-23      MANDIRI IDR       1220011559559   Apr 2023 - 31 Mar 2024                                    62,620,000   62,000,000    6,820,000       6,200,000        62,620,000
                                                        MEKAR PRANA INDAH, PT , Biaya atas Pemakaian
221    13-Oct-23      MANDIRI IDR       1220011559559   Listrik di Menara Bidakara 2 periode Aug 2023                281,163     278,380        30,621         27,838            281,163

                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel 1
222    13-Oct-23      MANDIRI IDR       1220011559559   Zona 1 periode 13 Juli 2023 - 12 Agustus 2023                322,925     319,727        35,170         31,972            322,925
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel
223    13-Oct-23      MANDIRI IDR       1220011559559   BZ3 periode 13 Juli 2023 - 12 Agustus 2023                   536,850     531,534        58,469         53,153            536,850
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Parkir DTW periode 13 Juli 2023 - 12 Agustus
224    13-Oct-23      MANDIRI IDR       1220011559559   2023                                                         106,150     105,098        11,561         10,509            106,150
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Parkir DTW
225    13-Oct-23      MANDIRI IDR       1220011559559   periode 13 Juli 2023 - 12 Agustus 2023                       160,336     158,748        17,462         15,874            160,336
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel BZ2 periode 13 Juli 2023 - 12
226    13-Oct-23      MANDIRI IDR       1220011559559   Agustus 2023                                                 161,479     159,880        17,587         15,988            161,479
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel
227    13-Oct-23      MANDIRI IDR       1220011559559   BZ2 periode 13 Juli 2023 - 12 Agustus 2023                   472,939     468,256        51,508         46,825            472,939
Page 127
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 13
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                      BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel BZ3 periode 13 Juli 2023 - 12
228    13-Oct-23      MANDIRI IDR       1220011559559   Agustus 2023                                                   172,791     171,080        18,819         17,108            172,791
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel 1 Zona 1 periode 13 Juli 2023 - 12
229    13-Oct-23      MANDIRI IDR       1220011559559   Agustus 2023                                                   134,927     133,591        14,695         13,359            134,927
                                                        TERAS NIRWANA BALI, PT , Biaya atas Pemakaian
                                                        Listrik di The CEO Building Periode 20 Jun 2022 - 19
230    13-Oct-23      MANDIRI IDR       1220011559559   Jul 2023                                                       112,514     111,400        12,254         11,140            112,514
                                                        PENGELOLA MASPION PLAZA GUNUNG SAHARI , Biaya
                                                        atas Pemakaian Listrik di Gedung Maspion Plaza Lt. 5A
231    13-Oct-23      MANDIRI IDR       1220011559559   periode Aug 2023                                               193,672     215,191           -           21,519            193,672
                                                        TOWER BERSAMA, PT , Sewa Local Loop Metro E 100
                                                        Mbps Kawasan Nusa Dua Bali (Tower Bersama Group)
232    13-Oct-23      MANDIRI IDR       1220011559559   periode 24 Sept 2023 - 23 Okt 2023                           9,374,000    8,600,000      946,000        172,000          9,374,000

                                                        SERPONG MAS TELEMATIKA, PT , Biaya Sewa Core FO
233    13-Oct-23      MANDIRI IDR       1220011559559   2 core HH Pos Polisi - German Center periode Jul 2023        1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        BIRU HIJAU, PT , Sewa Penempatan Perangkat di
                                                        Gedung Bluegreen periode 10 Sept 2023 - 09 Sept
234    13-Oct-23      MANDIRI IDR       1220011559559   2024                                                        16,335,000   18,150,000          -         1,815,000        16,335,000

                                                        JALA LINTAS MEDIA, PT , Sewa Local Loop 10Mbps IDC
235    13-Oct-23      MANDIRI IDR       1220011559559   to PT Darya Varia Laboratoria periode Sept 2023              2,180,000    2,000,000      220,000         40,000          2,180,000
                                                        PERHIMPUNAN PENGHUNI WISMA STACO , Sewa
                                                        Penempatan Perangkat di Gedung Wisma Staco
236    13-Oct-23      MANDIRI IDR       1220011559559   periode 09 Jul 2023 - 08 Jul 2024                           28,462,500   31,625,000          -         3,162,500        28,462,500
                                                        PENGELOLA APARTEMEN SEMANAN INDAH , Sewa
                                                        Penempatan Perangkat di Apartement Semanan Indah
237    13-Oct-23      MANDIRI IDR       1220011559559   periode 27 Jan 2023 - 26 Jan 2024                           13,500,000   15,000,000          -         1,500,000        13,500,000
                                                        PENGELOLA APARTEMEN SEMANAN INDAH , Sewa
                                                        Penempatan Perangkat di Apartement Semanan Indah
238    13-Oct-23      MANDIRI IDR       1220011559559   periode 27 Jan 2022 - 26 Jan 2023                           13,500,000   15,000,000          -         1,500,000        13,500,000
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Kabel ADSS 24 Core dari PT CCSI ke PT
239    13-Oct-23      MANDIRI IDR       1220011559559   Kaliabang Jaya Pratama                                       1,580,500    1,450,000      159,500         29,000          1,580,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
240    13-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman                  495,500     500,000         5,500         10,000            495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Bracket, JC 24 & 96 Core dari WH Serpong ke
241    13-Oct-23      MANDIRI IDR       1220011559559   WH Matraman                                                    495,500     500,000         5,500         10,000            495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Cable ADSS 48 Core dari PT Prysmian Cable
242    13-Oct-23      MANDIRI IDR       1220011559559   ke WH Matraman                                                 495,500     500,000         5,500         10,000            495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Switch, Rectifier dari Office Matraman ke WH
243    13-Oct-23      MANDIRI IDR       1220011559559   Serpong                                                        792,800     800,000         8,800         16,000            792,800
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Nut Ubolt, Bracket CCTV JPO dari PT KBC ke
244    13-Oct-23      MANDIRI IDR       1220011559559   WH Serpong                                                     495,500     500,000         5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari WH Serpong ke WH Green
245    13-Oct-23      MANDIRI IDR       1220011559559   Mansion                                                        743,250     750,000         8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
246    13-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                   495,500     500,000         5,500         10,000            495,500
Page 128
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 14
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                                 NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                           BANK          DPP           PPN             PPh        NET DIBAYARKAN
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari WH Serpong ke PT
247    13-Oct-23      MANDIRI IDR       1220011559559   Kaliabang Jaya Pratama                                            495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
248    13-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman                     495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari PT CCSI ke WH
249    13-Oct-23      MANDIRI IDR       1220011559559   Matraman                                                          743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Battery Lithium ZTE, Bracket, JC 24 Core dari
250    13-Oct-23      MANDIRI IDR       1220011559559   WH Serpong ke WH Matraman                                         644,150     650,000         7,150         13,000           644,150
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material JC 96 Core, Battery Lithium 100AH ZTE dari
251    13-Oct-23      MANDIRI IDR       1220011559559   WH Serpong ke Office Matraman                                   1,288,300    1,300,000       14,300         26,000         1,288,300
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
252    13-Oct-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                      495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Relokasi Jl. Pati. Revitalisasi Jl. Juanda -
                                                        Kebon Melati-001 dari PT CCSI ke PT Manna Abadi
253    13-Oct-23      MANDIRI IDR       1220011559559   Sejahtera                                                         743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Telematika dari PT DHJ ke CV Ekasindo Energi
254    13-Oct-23      MANDIRI IDR       1220011559559   Doa                                                             1,833,350    1,850,000       20,350         37,000         1,833,350
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Mikrotik dan Kabel UTP dari WH Penjernihan
255    13-Oct-23      MANDIRI IDR       1220011559559   ke WH Serpong dan Office Bandung                                1,238,750    1,250,000       13,750         25,000         1,238,750
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable Optical dari PT Furukawa ke WH
256    13-Oct-23      MANDIRI IDR       1220011559559   Matraman                                                          495,500     500,000         5,500         10,000           495,500
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material Battery, Switch Nokia, Rectifier dari WH
257    13-Oct-23      MANDIRI IDR       1220011559559   Serpong ke WH Bali                                              6,887,450    6,950,000       76,450        139,000         6,887,450
                                                        CYBERINDO ADITAMA, PT , Biaya Crossconnect FO
                                                        CBN Tenant PT Keb Hana Bank KCP Central Park Bulan
258     16-Oct-23       BCA IDR          3193058058     Sept 2023                                                       3,052,000    2,800,000      308,000         56,000         3,052,000
                                                        CYBERINDO ADITAMA, PT , Biaya Sewa Local Loop
                                                        100Mbps site Menara Jamsostek untuk Tenant PT
259     16-Oct-23       BCA IDR          3193058058     Pamerindo Indonesia periode Sept 2023                           7,630,000    7,000,000      770,000        140,000         7,630,000
                                                        NTT INDONESIA, PT , Biaya Cross-Connect Rack S2
                                                        APJII Lantai 1 ke NTT Lantai 3A (Interkoneksi
260     16-Oct-23       BCA IDR          3193058058     Facebook) periode Sept 2023                                    10,900,000   10,000,000    1,100,000        200,000        10,900,000
                                                        NTT INDONESIA, PT , Sewa NTT Fiber Connect (XC
261     16-Oct-23       BCA IDR          3193058058     Inter DC Akamai - APJII) periode Sept 2023                      7,085,000    6,500,000      715,000        130,000         7,085,000
                                                        NTT INDONESIA, PT , Sewa Crossconnect Establish
                                                        NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
262     16-Oct-23       BCA IDR          3193058058     Sept 2023                                                      14,715,000   13,500,000    1,485,000        270,000        14,715,000

                                                        ASOSIASI PENYELENGGARA JASA INTERNET
                                                        INDONESIA , Uang Muka Beban Umum atas Biaya
                                                        Prorate Penambahan IP ADD /20 periode September
263     16-Oct-23       BCA IDR          3193058058     2023 - Mei 2024) APJII - PR: 1010035342 - Trf                   4,823,251    4,823,251          -                -         4,823,251
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Paket Data
                                                        Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                        Alarm. Periode Oktober 2023 Jawa Tengah sebanyak 7
264     16-Oct-23       BCA IDR          3193058058     MSISDN                                                            569,799     513,333        56,466              -           569,799
Page 129
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 15
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP           PPN             PPh        NET DIBAYARKAN
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Paket Data
                                                        Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                        Alarm. Periode Oktober 2023 Jawa Tengah sebanyak
265     16-Oct-23       BCA IDR          3193058058     10 MSISDN                                                    1,054,500     950,000       104,500              -         1,054,500
                                                        PEMERINTAH KOTA PASURUAN , Uang Muka Beban
                                                        Umum atas Biaya Pembayaran Sewa Pemanfaatan
                                                        Tanah Milik Pemerintah Kota Pasuruan Periode 30
                                                        September 2023 - 29 September 2024 - PR :
266    16-Oct-23      MANDIRI IDR       1220011559559   1010035197 - Trf                                            38,812,500   38,812,500          -                -        38,812,500
                                                        PERHIMPUNAN PENGHUNI MENARA KADIN
                                                        INDONESIA , Uang Muka Beban Umum atas Biaya
                                                        deposit pekerjaan dismantle balifiber di Menara Kadin
267    16-Oct-23      MANDIRI IDR       1220011559559   Indonesia-Oktober 2023-Fttx Ops - Trf                       10,000,000   10,000,000          -                -        10,000,000

                                                        GERAI LISTRIK PASAR MOBIL KEMAYORAN , Biaya
                                                        Tagihan Pascabayar untuk Site Gunung Sahari Utara-
                                                        008, Gunung Sahari Utara-009 dan Danau Sunter DII-
                                                        003 Periode Oktober 2023 (Pemakaian September
268    16-Oct-23      MANDIRI IDR       1220011559559   2023) Gerai Listrik Pasar Mobil Kemayoran                    3,884,781    3,964,062          -           79,281         3,884,781
                                                        PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
269    16-Oct-23      MANDIRI IDR       1220011559559   Phase 10 Jawa Barat Periode Oktober 2023                    42,812,000   42,812,000          -                -        42,812,000
                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode
                                                        Januari - Februari 2022 di Kawasan Apartement
270    16-Oct-23      MANDIRI IDR       1220011559559   Element                                                      2,032,389    1,864,577      205,103         37,291         2,032,389
                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode
                                                        November 2019 - Oktober 2021 di Kawasan
271    16-Oct-23      MANDIRI IDR       1220011559559   Apartement Element                                             707,785     649,344        71,427         12,986           707,785
                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode
                                                        November 2021 - Desember 2021 di Kawasan
272    16-Oct-23      MANDIRI IDR       1220011559559   Apartement Element                                           1,219,536    1,118,840      123,072         22,376         1,219,536
                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode
273    16-Oct-23      MANDIRI IDR       1220011559559   Maret- April 2022 di Kawasan Apartement Element              2,940,664    2,697,857      296,764         53,957         2,940,664

                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode Mei -
274    16-Oct-23      MANDIRI IDR       1220011559559   Agustus 2022 di Kawasan Apartement Element                   8,742,388    8,020,539      882,259        160,410         8,742,388
                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode
                                                        September - Desember 2022 di Kawasan Apartement
275    16-Oct-23      MANDIRI IDR       1220011559559   Element                                                     13,114,495   12,031,646    1,323,481        240,632        13,114,495

                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode
276    16-Oct-23      MANDIRI IDR       1220011559559   Januari - Maret 2023 di Kawasan Apartement Element          12,745,069   11,692,724    1,286,199        233,854        12,745,069
                                                        PARTNERSHIP & EXPANSION , Uang Muka Beban
                                                        Umum atas Biaya Pembongkaran, Pembersihan dan
                                                        Pengangkutan Material Kantor Balifiber di Discovery
                                                        Shopping Mall Bali - PR : 1010035376 - Trf
277    16-Oct-23      MANDIRI IDR       1220011559559                                                                3,104,000    3,104,000          -                -         3,104,000
                                                        ASIA TEKNOLOGI SOLUSI, PT , Sewa Local Loop 50
                                                        Mbps PT Asia Teknologi Solusi untuk Tenant PT Seven
                                                        Morning - site PIK to Cyber 1 periode 16 - 31 Agust
278    16-Oct-23      MANDIRI IDR       1220011559559   2023                                                         1,687,743    1,548,387      170,323         30,967         1,687,743
Page 130
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 16
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN

                                                        ASIA TEKNOLOGI SOLUSI, PT , Sewa Local Loop 50
                                                        Mbps PT Asia Teknologi Solusi untuk Tenant PT Seven
279    16-Oct-23      MANDIRI IDR       1220011559559   Morning - site PIK to Cyber 1 periode Sept 2023             3,270,000     3,000,000      330,000         60,000          3,270,000
                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 08 Nov
                                                        2023 s.d 07 Nov 2024 - No. Aplikasi :
280    16-Oct-23        BCA IDR          3193058058     02698896102022                                              9,881,919     9,881,919          -                -          9,881,919
                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 08 Nov
                                                        2023 s.d 07 Nov 2024 - No. Aplikasi :
281    16-Oct-23        BCA IDR          3193058058     02698897102022                                              9,881,919     9,881,919          -                -          9,881,919
                                                        EQUINIX SINGAPORE PTE LTD , Biaya Sewa Rack
                                                        Colocation dan Interkoneksi Equinix Singapore
282     17-Oct-23     SINARMAS IDR       0000240408     periode Sept 2023                                         101,530,025   101,530,025          -                -        101,530,025
                                                        TELIA CARRIER SINGAPORE PTE LTD , Biaya Sewa Telia
283     17-Oct-23    SINARMAS USD        0000670707     IP Transit 3Gbps Periode Sept 2023                         37,684,800    37,684,800          -                -         37,684,800
                                                        CHINA MOBILE INTERNATIONAL LTD , IP Transit
284     17-Oct-23    SINARMAS USD        0000670707     Equinix SG 20Mbps Periode Sept 2023                         7,379,940     7,379,940          -                -          7,379,940
                                                        CHINA MOBILE INTERNATIONAL LTD , IP Transit
285     17-Oct-23    SINARMAS USD        0000670707     Equinix SG 50Mbps Periode Sept 2023                        10,237,704    10,237,704          -                -         10,237,704

                                                        PEMERINTAH KABUPATEN TANGERANG , Uang Muka
                                                        Beban Umum atas Biaya Retribusi Pengendalian
286    17-Oct-23      MANDIRI IDR       1220011559559   Menara 28 Site Kab Tangerang Tahun 2023                    75,735,000    75,735,000          -                -         75,735,000
                                                        JALA LINTAS MEDIA, PT , Sewa Local Loop 10 Mbps &
                                                        20 Mbps Tenant Citeureup dan Gunung Putri (VLAN)
287    17-Oct-23      MANDIRI IDR       1220011559559   periode Sept 2023                                           9,265,000     8,500,000      935,000        170,000          9,265,000
                                                        JALA LINTAS MEDIA, PT , Sewa Local Loop 10 Mbps &
                                                        20 Mbps Tenant Citeureup dan Gunung Putri (VLAN)
288    17-Oct-23      MANDIRI IDR       1220011559559   periode Agust 2023                                          9,265,000     8,500,000      935,000        170,000          9,265,000
                                                        TEKNOVATUS SOLUSI SEJAHTERA, PT , Sewa
                                                        Colocation Rack & MMR Connect untuk Tenant PT
                                                        Wirecard Technologies Indonesia periode 01 - 30 Sept
289    17-Oct-23      MANDIRI IDR       1220011559559   2023                                                        6,022,250     5,525,000      607,750        110,500          6,022,250

                                                        TEKNOVATUS SOLUSI SEJAHTERA, PT , Tagihan Sewa
                                                        Collocation Rack 47 U 19" periode Sept 2023 dan
290    17-Oct-23      MANDIRI IDR       1220011559559   Kelebihan Pemakaian Listrik periode Agust 2023             28,527,752    26,172,250    2,878,947        523,445         28,527,752
                                                        PERHIMNI WESTMARK , Sewa Penempatan Perangkat
                                                        di Apartement Perhimni Westmark periode 10 Jul
291    17-Oct-23      MANDIRI IDR       1220011559559   2023 - 09 Jul 2024                                         22,500,000    25,000,000          -         2,500,000        22,500,000
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                        Pengelasan RRU Tenant IOH Site Cengkareng Barat-
292    17-Oct-23      MANDIRI IDR       1220011559559   006                                                           420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                        Pengelasan RRU Tenant IOH Site Kedaung Kali Angke-
293    17-Oct-23      MANDIRI IDR       1220011559559   001                                                           420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
294    17-Oct-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Senayan-002                    420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
295    17-Oct-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Rawa Buaya-002                 420,420      431,200           -           10,780            420,420

                                                        PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                        KIRANA TWO , Biaya atas Pemakaian Listrik di Gedung
296    17-Oct-23      MANDIRI IDR       1220011559559   Kirana Two periode 21 Jul 2023 - 20 Aug 2023                  701,867      779,852           -           77,985            701,867
                                                        NOTARIS STEFANIE HARTANTO , Jasa Pembuatan
                                                        Perjanjian Sewa Menyewa site Sukadamai (Bpk.
297    17-Oct-23      MANDIRI IDR       1220011559559   Waris, S.Pd)                                                  750,750      770,000           -           19,250            750,750
Page 131
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 17
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                      NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK            DPP             PPN             PPh         NET DIBAYARKAN

                                                        INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                        Sinyal untuk Tenant di Gedung Living World Bali
298    17-Oct-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Agustus 2023                    19,866,762     17,897,984      1,968,778              -         19,866,762
                                                        INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                        Sinyal untuk Tenant di Gedung MSIG Berdasarkan
299    17-Oct-23      MANDIRI IDR       1220011559559   Profit Sharing Agustus 2023                                30,844,572     27,787,903      3,056,669              -         30,844,572

                                                        CIRCLECOM NUSANTARA INDONESIA, PT , Sewa Lahan
                                                        di Kawasan Pantai Indah Kapuk site Kamal Muara-016
                                                        periode 28 Jun 2023 - 27 Jun 2024, Kamal Muara-031
300    17-Oct-23      MANDIRI IDR       1220011559559   periode 31 Agust 2023 - 30 Agust 2024                     121,200,000    120,000,000     13,200,000      12,000,000       121,200,000
                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site 751213 Tuban 010(PO
301    17-Oct-23      SINARMAS IDR       0002999994     Rp.1.025.641,- Potongan PPh 21(2.5%) Rp.25.641,-)           1,000,000      1,025,641            -           25,641          1,000,000
                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site 751168 Tumbak Bayuh
                                                        003(PO Rp.1.282.051,-Potongan PPh 21(2.5%)
302    17-Oct-23      SINARMAS IDR       0002999994     Rp.32.051,-)                                                1,250,000      1,282,051            -           32,051          1,250,000
                                                        BALI PECATU GRAHA, PT , Biaya Pembayaran Tagihan
                                                        Listrik dan IPL BPG bulan Oktober 2023 (Pemakaian
303    17-Oct-23      SINARMAS IDR       0002999994     Bulan September 2023)                                      11,879,284     11,879,284            -                -         11,879,284
                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                        Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                        dan Monopole Triwulan IV/2023 Periode Oct-Dec
304    17-Oct-23     SINARMAS USD        0000670707     2023                                                      592,870,777    658,745,378            -        65,874,601       592,870,777

                                                        PERMATA INDO SEJAHTERA, PT , Reimbursement
305    18-Oct-23      MANDIRI IDR       1220011559559   Salary Outsource Div. Direct Sales periode Sept 2023      106,949,030    106,240,758        865,665        157,393        106,949,030
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
306    18-Oct-23      MANDIRI IDR       1220011559559   General 2 Lt.GF periode Sep 2023                              462,885        424,665         46,713           8,493           462,885
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
307    18-Oct-23      MANDIRI IDR       1220011559559   General 4 Lt.2 periode Sep 2023                               265,239        243,338         26,767           4,866           265,239
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
308    18-Oct-23      MANDIRI IDR       1220011559559   General 1 BSM periode Sep 2023                                 98,360           90,238        9,926           1,804            98,360
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
309    18-Oct-23      MANDIRI IDR       1220011559559   General 3 Lt.1 periode Sep 2023                               406,963        373,361         41,069           7,467           406,963

                                                        JAKARTA INTILAND, PT , Biaya atas Pemakaian Listrik
310    18-Oct-23      MANDIRI IDR       1220011559559   di Ramayana Karawang Periode September 2023                   557,424        551,906         60,708         55,190            557,424

                                                        JAKARTA INTILAND, PT , Biaya atas Pemakaian Listrik
311    18-Oct-23      MANDIRI IDR       1220011559559   di Ramayana Jatinegara Periode September 2023                 369,740        366,080         40,268         36,608            369,740
                                                        PLN PERSERO, PT , Biaya Tagihan KWH PLN Pasca
312    18-Oct-23      MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode Oketober 2023          2,365,270,759   2,365,270,759           -                -       2,365,270,759
                                                        PLN PERSERO, PT , Biaya PLN Autodebet Jawa Timur
313    18-Oct-23      MANDIRI IDR       1220011559559   Periode Oktober 2023                                      186,391,866    186,391,866            -                -        186,391,866
                                                        PLN PERSERO, PT , Biaya Tagihan KWH PLN
                                                        Pascabayar Region Jawa Tengah Periode Oktober
314    18-Oct-23      MANDIRI IDR       1220011559559   2023                                                      146,298,657    146,298,657            -                -        146,298,657
                                                        PLN PERSERO, PT , Biaya PLN Auto Debet Region Jawa
315    18-Oct-23      MANDIRI IDR       1220011559559   Barat Periode Oktober 2023                                 66,546,949     66,546,949            -                -         66,546,949
Page 132
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 18
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                      NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                       BANK            DPP             PPN             PPh         NET DIBAYARKAN
                                                        PLN PERSERO, PT , Biaya Tagihan Listrik PLN
316    18-Oct-23      MANDIRI IDR       1220011559559   Pascabayar BTS Region Bali Periode Oktober 2023           1,257,495,360   1,257,495,360           -                -       1,257,495,360
                                                        TELKOM INDONESIA, PT , Biaya Paket Broadband
                                                        Indihome for Monitoring (CSR) CCTV, FO not ready.
317    19-Oct-23      MANDIRI IDR       1220011559559   area Yogyakarta Periode Oktober 2023                          1,265,400      1,140,000        125,400              -          1,265,400
                                                        SMART TELECOM, PT , Internet Banndwith 2site
318    19-Oct-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001169)                                     59,940,000     54,000,000      5,940,000              -         59,940,000
                                                        PLN PERSERO, PT , Biaya Pengisian Token Listrik KWH
319    19-Oct-23      MANDIRI IDR       1220011559559   PLN site Jagakarsa-032                                           91,544           91,544          -                -             91,544
                                                        PLN PERSERO, PT , Biaya Pembelian Token Listrik site
                                                        oken Listrik site Jagalan-009 Tenant IOH Periode
320    19-Oct-23      MANDIRI IDR       1220011559559   September 2023 Region Jawa Tengah                               306,000        306,000            -                -            306,000
                                                        XL AXIATA TBK, PT , Biaya Top Up Paket Data Mikrotik
                                                        site Tawangsari-008 Tenant Smartfren Periode
321    19-Oct-23      MANDIRI IDR       1220011559559   September 2023 Region Jawa Tengah                                61,500           61,500          -                -             61,500
                                                        SERPONG CIPTA KREASI, PT , Biaya atas Pemakaian
                                                        Listrik di Plaza Summarecon Serpong periode Sep
322    20-Oct-23      MANDIRI IDR       1220011559559   2023                                                            992,912        983,081        108,139         98,308            992,912
                                                        SMART TELECOM, PT , Internet Banndwith 4site
323    23-Oct-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001166)                                    119,880,000    108,000,000     11,880,000              -        119,880,000
                                                        BINAJASA SUMBER SARANA, PT , Reimbursement
                                                        Salary Outsource Div. Direct Sales periode Sept 2023,
324    23-Oct-23      MANDIRI IDR       1220011559559   Insentif periode Agust 2023                                 136,601,567    135,696,920      1,105,679        201,032        136,601,567
                                                        BINAJASA SUMBER SARANA, PT , Reimbursement
325    23-Oct-23      MANDIRI IDR       1220011559559   Salary Outsource All Dept periode Sept 2023                 109,900,143    109,172,327        889,552        161,736        109,900,143
                                                        PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
326    23-Oct-23      MANDIRI IDR       1220011559559   Phase 10 Jawa Tengah Periode September 2023                 185,287,000    185,287,000            -                -        185,287,000
                                                        P3SRS SEMENTARA MEGA GLODOK KEMAYORAN ,
                                                        Biaya atas Pemakaian Listrik di MGK Kemayoran
327    23-Oct-23      MANDIRI IDR       1220011559559   periode 20 Jun 2023 - 20 Jul 2023                               130,528        130,528            -                -            130,528
                                                        P3SRS SEMENTARA MEGA GLODOK KEMAYORAN ,
                                                        Biaya atas Pemakaian Listrik di MGK Kemayoran
328    23-Oct-23      MANDIRI IDR       1220011559559   periode 20 Aug 2023 - 20 Sep 2023                               129,966        129,966            -                -            129,966
                                                        P3SRS SEMENTARA MEGA GLODOK KEMAYORAN ,
                                                        Biaya atas Pemakaian Listrik di MGK Kemayoran
329    23-Oct-23      MANDIRI IDR       1220011559559   periode 20 Jul 2023 - 20 Aug 2023                               134,277        134,277            -                -            134,277
                                                        INDOKARYA SUKSES BERSAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Apartemen Pluit Sea View
330    23-Oct-23      MANDIRI IDR       1220011559559   Periode 26 Jul 2023 - 31 Aug 2023                             1,512,097      1,680,107            -          168,010          1,512,097
                                                        INDOKARYA SUKSES BERSAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Apartemen Pluit Sea View
331    23-Oct-23      MANDIRI IDR       1220011559559   Periode 31 Aug 2023 - 25 Sep 2023                               854,906        949,895            -           94,989            854,906
                                                        TERAS NIRWANA BALI, PT , Biaya atas Pemakaian
                                                        Listrik di The CEO Building Periode 20 Jul 2022 - 19
332    23-Oct-23      MANDIRI IDR       1220011559559   Aug 2023                                                        226,824        224,578         24,703         22,457            226,824
                                                        PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
333    23-Oct-23      MANDIRI IDR       1220011559559   Pluit LG-04 periode Agustus 2023                                519,913        519,913            -                -            519,913
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                        4/B.071 (Call Center) Periode 18 Aug 2022 - 17 Sep
334    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                         11,485,260     12,761,400            -         1,276,140        11,485,260
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
335    23-Oct-23      MANDIRI IDR       1220011559559   Periode 18 Aug 2022 - 17 Sep 2023                             2,646,523      2,940,581            -          294,058          2,646,523
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
336    23-Oct-23      MANDIRI IDR       1220011559559   periode 18 Aug 2022 - 17 Sep 2023                             1,152,562      1,280,624            -          128,062          1,152,562
Page 133
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 19
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                            NILAI MUTASI                 NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                      BANK          DPP          PPN             PPh        NET DIBAYARKAN
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel BZ2 periode 13 Aug 2023 - 12 Sep
337    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                         161,196     159,600       17,556         15,960           161,196
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Parkir DTW
338    23-Oct-23      MANDIRI IDR       1220011559559   periode 13 Aug 2023 - 12 Sep 2023                            159,633     158,052       17,386         15,805           159,633
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel 1 Zona 1 13 Aug 2023 - 12 Sep
339    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                         132,951     131,634       14,480         13,163           132,951
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel
340    23-Oct-23      MANDIRI IDR       1220011559559   BZ3 periode 13 Aug 2023 - 12 Sep 2023                        538,448     533,116       58,643         53,311           538,448
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel BZ3 periode 13 Aug 2023 - 12 Sep
341    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                         173,074     171,360       18,850         17,136           173,074

                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
342    23-Oct-23      MANDIRI IDR       1220011559559   Bekasi Parkir DTW periode 13 Aug 2023 - 12 Sep 2023          106,025     104,975       11,547         10,497           106,025

                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel 1
343    23-Oct-23      MANDIRI IDR       1220011559559   Zona 1 periode 13 Aug 2023 - 12 Sep 2023                     311,757     308,669       33,954         30,866           311,757
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel
344    23-Oct-23      MANDIRI IDR       1220011559559   BZ2 periode 13 Aug 2023 - 12 Sep 2023                        471,341     466,674       51,334         46,667           471,341
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-D) periode 16
345    23-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 15 Sep 2023                                       123,360     122,138       13,435         12,213           123,360
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-B) periode 16
346    23-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 15 Sep 2023                                       135,723     134,380       14,781         13,438           135,723
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-A) periode 16
347    23-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 15 Sep 2023                                       152,514     151,004       16,610         15,100           152,514
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-E) periode 16
348    23-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 15 Sep 2023                                       161,520     159,921       17,591         15,992           161,520
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Sep
349    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                         255,530     253,000       27,830         25,300           255,530
                                                        MEGA PLAZA, PT , Biaya atas Pemakaian Listrik di
350    23-Oct-23      MANDIRI IDR       1220011559559   Gedung Mega Plaza periode Aug 2023                           170,248     168,563       18,541         16,856           170,248
                                                        ISMAWA TRIMITRA, PT , Biaya atas Pemakaian Listrik
                                                        di Graha Iskandarsyah periode 21 Aug 2023 - 20 Sep
351    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                         159,421     157,842       17,363         15,784           159,421
                                                        ISMAWA TRIMITRA, PT , Biaya atas Pemakaian Listrik
                                                        di Graha Iskandarsyah periode 20 Jul 2023 - 21 Aug
352    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                         164,158     162,532       17,879         16,253           164,158

                                                        TRI PURA INDAH PERSADA, PT , Biaya atas Pemakaian
353    23-Oct-23      MANDIRI IDR       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Aug 2023              274,121     271,406       29,855         27,140           274,121
Page 134
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 20
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP             PPN             PPh          NET DIBAYARKAN

                                                        TRI PURA INDAH PERSADA, PT , Biaya atas Pemakaian
354    23-Oct-23      MANDIRI IDR       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Sep 2023                268,087     265,432          29,198         26,543             268,087
                                                        AMAZANA KENCANA, PT , Biaya atas Pemakaian
355    23-Oct-23      MANDIRI IDR       1220011559559   Listrik Apartemen Amazana Periode Sep 2023                     386,746     354,813          39,029          7,096             386,746
                                                        GRIYA MURIA KENCANA, PT , Tagihan Revenue
                                                        Sharing periode Agustus 2023 atas Penempatan
356    23-Oct-23      MANDIRI IDR       1220011559559   Perangkat Telekomunikasi di Gedung Prince Center             1,131,689    1,120,484        123,253        112,048           1,131,689
                                                        GRIYA MURIA KENCANA, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Prince Center periode 26 Aug 2023 -
357    23-Oct-23      MANDIRI IDR       1220011559559   25 Sep 2023                                                    232,157     229,858          25,284         22,985             232,157
                                                        PUALAM KENCANA GEMILANG JAKARTA, PT , Biaya
                                                        atas Pemakaian Listrik di Gedung Perwata Tower
358    23-Oct-23      MANDIRI IDR       1220011559559   periode 26 Aug 2023 - 25 Sep 2023                              613,243     607,172          66,788         60,717             613,243

                                                        PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                        KIRANA TWO , Biaya atas Pemakaian Listrik di Gedung
359    23-Oct-23      MANDIRI IDR       1220011559559   Kirana Two periode 21 Aug 2023 - 20 Sep 2023                   740,431     822,701             -           82,270             740,431

                                                        PERHIMPUNAN PENGHUNI WISMA STACO , Biaya atas
360    23-Oct-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Wisma Staco periode Sep 2023              148,743     165,270             -           16,527             148,743
                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH RUSUN SPAZIO , Biaya Admin atas Pemakaian
                                                        Listrik di Rusun Spazio periode 21 Aug 2023 - 20 Sep
361    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                            13,085         13,352          -                267            13,085

                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH RUSUN SPAZIO , Biaya atas Pemakaian Listrik
362    23-Oct-23      MANDIRI IDR       1220011559559   di Rusun Spazio periode 21 Aug 2023 - 20 Sep 2023              133,518     133,518             -                -             133,518
                                                        SUGIH BERKAT, PT , Biaya atas Pemakaian Listrik di
                                                        Gedung Menara Citicon periode 27 Aug 2023 - 27 Sep
363    23-Oct-23      MANDIRI IDR       1220011559559   2023                                                           707,000     700,000          77,000         70,000             707,000
                                                        HIJAU TEDUH SAKA PERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Sastra Graha Periode 11
364    23-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 10 Sep 2023                                         133,086     147,873             -           14,787             133,086
                                                        NICO CENTRAL, PT , Biaya atas Pemakaian Listrik di
365    23-Oct-23      MANDIRI IDR       1220011559559   Gedung Sona Topas Tower Periode Sep 2023                       355,419     351,900          38,709         35,190             355,419
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
366    23-Oct-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Gelora-009                      420,420     431,200             -           10,780             420,420
                                                        PERHIMPUNAN PENGHUNI WISMA GADING PERMAI ,
                                                        Tagihan Revenue Sharing periode April - Juni 2023 di
367    23-Oct-23      MANDIRI IDR       1220011559559   Apartemen Wisma Gading Permai                                4,918,239    5,464,709            -          546,470           4,918,239
                                                        AWAN KILAT SEMESTA, PT , Tagihan Revenue Sharing
                                                        periode Agustus 2023 atas penjualan produk
368    23-Oct-23      MANDIRI IDR       1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                   30,605,400   31,230,000            -          624,600          30,605,400
                                                        MEGA TELEKOMUNIKASI INDONESIA, PT , Biaya
                                                        Penempatan Sewa Perangkat Telekomunikasi
                                                        berdasarkan Revenue Sharing periode April - Juni
369    23-Oct-23      MANDIRI IDR       1220011559559   2023 di Gedung Metropolitan Tower                           32,306,294   31,986,429      3,518,507       3,198,642         32,306,294
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Summarecon Digital Centre (SDC)
370    23-Oct-23      MANDIRI IDR       1220011559559   Serpong periode 11 Aug 2023 - 10 Sep 2023                       84,490         83,653        9,202          8,365              84,490

                                                        MENARA PRAMBANAN, PT , Biaya atas Pemakaian
371    23-Oct-23      MANDIRI IDR       1220011559559   Listrik di Apartement Poins Square periode Aug 2023            214,270     238,077             -           23,807             214,270
Page 135
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 21
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP             PPN             PPh        NET DIBAYARKAN
                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site Jimbaran 029(PO
372    23-Oct-23      SINARMAS IDR       0002999994     Rp.974.359,- Potongan PPh 21(2.5%) Rp.24.359,-)                950,000     974,359             -           24,359           950,000
                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site Ungasan 009(PO
373    23-Oct-23      SINARMAS IDR       0002999994     Rp.717.949,- Potongan PPh 21(2.5%) Rp.17.949,-)                700,000     717,949             -           17,949           700,000

                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site Kerobokan Kelod 025(PO
374    23-Oct-23      SINARMAS IDR       0002999994     Rp.512.820,- Potongan PPh 21(2.5%) Rp.12.820,- )               500,000     512,820             -           12,820           500,000
                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                        Penggantian Biaya Listrik Bulan Agustus 2023 site
375    23-Oct-23      MANDIRI IDR       1220011559559   BTDC                                                         8,059,153    8,059,153            -                -         8,059,153
                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT ,
376    23-Oct-23      MANDIRI IDR       1220011559559   Penggantian Biaya Listrik Bulan Juli 2023 site BTDC          8,250,568    8,250,568            -                -         8,250,568
                                                        BINTANG SEMPURNA, PT , Pembelian Flyer Green
377    24-Oct-23      MANDIRI IDR       1220011559559   Pramuka Juli 2023 Sebanyak 1.000 Pcs                         2,398,000    2,200,000        242,000         44,000         2,398,000
                                                        KEMENTERIAN SEKRETARIS NEGARA RI PUSAT
                                                        PENGELOLAAN KOMPLEK GELORA BUNG KARNO ,
                                                        Tagihan Sharing Revenue Bali Fiber di Komplek Gelora
378    24-Oct-23      MANDIRI IDR       1220011559559   Bung Karno periode April - Juni 2023                        86,849,052   78,242,389      8,606,663              -        86,849,052
                                                        RAJAWALI ANUGRAH RESOURCES, PT ,
                                                        Reimbursement Salary Outsource Div. Direct Sales
379    24-Oct-23      MANDIRI IDR       1220011559559   periode Sept 2023, Insentif periode Agust 2023              96,628,886   95,988,959        782,132        142,205        96,628,886
                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
380    24-Oct-23      MANDIRI IDR       1220011559559   Listrik di The Springlake View periode Aug 2023                704,615     697,638          76,740         69,763           704,615
                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
                                                        Listrik di The Springlake Apartement periode Aug
381    24-Oct-23      MANDIRI IDR       1220011559559   2023                                                           529,294     524,053          57,646         52,405           529,294
                                                        LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                        Summarecon Mal Serpong 1 periode 11 Aug 2023 -
382    24-Oct-23      MANDIRI IDR       1220011559559   10 Sep 2023                                                    783,767     776,006          85,361         77,600           783,767
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Summarecon Mal Serpong 1
383    24-Oct-23      MANDIRI IDR       1220011559559   periode 11 Aug 2023 - 10 Sep 2023                              293,815     290,905          32,000         29,090           293,815
                                                        LESTARI MAHADIBYA, PT , Biaya atas Pemakaian
                                                        Listrik di Scientia Square Park (SQP) Serpong periode
384    24-Oct-23      MANDIRI IDR       1220011559559   11 Aug 2023 - 10 Sep 2023                                      134,740     133,405          14,675         13,340           134,740
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Scientia Square Park (SQP)
385    24-Oct-23      MANDIRI IDR       1220011559559   Serpong periode 11 Aug 2023 - 10 Sep 2023                       54,879         54,335        5,977          5,433            54,879
                                                        LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                        Summarecon Digital Centre (SDC) Serpong periode 11
386    24-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 10 Sep 2023                                         302,578     299,582          32,954         29,958           302,578

                                                        MENARA PRAMBANAN, PT , Biaya atas Pemakaian
387    24-Oct-23      MANDIRI IDR       1220011559559   Listrik di Apartement Poins Square periode Sep 2023            207,051     230,056             -           23,005           207,051
                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
388    24-Oct-23      MANDIRI IDR       1220011559559   Listrik di The Kensington periode Sep 2023                     131,487     130,185          14,320         13,018           131,487
                                                        MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                        Pemakaian Listrik Gedung Palma Tower lt. 11 periode
389    24-Oct-23      MANDIRI IDR       1220011559559   Sep 2023                                                       103,048     102,027          11,223         10,202           103,048
                                                        MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                        Pemakaian Listrik Gedung Palma Tower lt. B.1 periode
390    24-Oct-23      MANDIRI IDR       1220011559559   Sep 2023                                                       103,048     102,027          11,223         10,202           103,048
Page 136
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 22
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                       BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                        Listrik di Plaza Senayan Periode 28 Jul 2023 - 28 Aug
391    24-Oct-23      MANDIRI IDR       1220011559559   2023                                                            473,781     469,090          51,600         46,909            473,781
                                                        SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                        Listrik di Plaza Senayan Arcadia Periode 28 Jul 2023 -
392    24-Oct-23      MANDIRI IDR       1220011559559   28 Aug 2023                                                      83,224         82,400        9,064          8,240             83,224
                                                        SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                        Listrik di Sentral Senayan I Periode 28 Jul 2023 - 28
393    24-Oct-23      MANDIRI IDR       1220011559559   Aug 2023                                                         74,054         73,320        8,066          7,332             74,054
                                                        RAJAWALI ADIWISMA, PT , Biaya atas Pemakaian
394    24-Oct-23      MANDIRI IDR       1220011559559   Listrik di Menara Rajawali Periode Sep 2023                     177,088     175,335          19,286         17,533            177,088

                                                        ANGKASA PURA SUPPORT, PT , Pembayaran Tagihan
                                                        Listrik Angkasa pura untuk site M_335 area Kargo,
                                                        M_334 AP Bali -Kantor Imigrasi, M_331 AP Bali -Hotel
                                                        Haris, M_332 AP Bali-Area Parkir, dan M_333 AP Bali -
395    24-Oct-23      MANDIRI IDR       1220011559559   Departure Area Periode Jul 2023                              13,229,199   12,136,879      1,335,057        242,737         13,229,199
                                                        PENGELOLA PUSAT BELANJA, PT , Biaya atas
                                                        Pemakaian Listrik di Mall Bassura periode 16 Aug
396    25-Oct-23      MANDIRI IDR       1220011559559   2023 - 15 Sep 2023                                              850,455     842,034          92,624         84,203            850,455
                                                        DATAMEDIA MAKMUR PRATAMA, PT , Biaya Layanan
                                                        Content TV 42 Channel untuk Tenant RS Atma Jaya
397    25-Oct-23      MANDIRI IDR       1220011559559   Pluit periode Okt 2023                                       12,740,000   13,000,000            -          260,000         12,740,000
                                                        SMART MILENIUM EFFISIENSI, PT , Biaya Pemakaian
                                                        Pulsa Telepon Pelanggan Corporate periode Agust
398    25-Oct-23      MANDIRI IDR       1220011559559   2023                                                          2,003,089    1,804,585        198,504              -          2,003,089
                                                        LINK NET TBK, PT , Sewa Crossconnect 35 Mbps dari
                                                        Omadata Wisma Dharmala Intiland Local Loop (PO
399    25-Oct-23      MANDIRI IDR       1220011559559   Tenant Intiland) periode Sept 2023                            9,810,000    9,000,000        990,000        180,000          9,810,000
                                                        CYBER NETWORK INDONESIA, PT , Sewa Colocation
                                                        Rack IU OTB (MMR) PKS 401/PKS/CNI/VII/2023
400    25-Oct-23      MANDIRI IDR       1220011559559   periode Okt 2023                                              3,297,250    3,025,000        332,750         60,500          3,297,250
                                                        CYBER NETWORK INDONESIA, PT , Sewa Colocation
                                                        Rack IU OTB (MMR) PKS 402/PKS/CNI/VI/2023
401    25-Oct-23      MANDIRI IDR       1220011559559   periode Okt 2023                                              3,597,000    3,300,000        363,000         66,000          3,597,000
                                                        INTERNETINDO DATA CENTRA INDONESIA, PT , Sewa
                                                        Crossconnect 3D 5 UTP dan 3D 3 FO periode Sept
402    25-Oct-23      MANDIRI IDR       1220011559559   2023                                                          3,270,000    3,000,000        330,000         60,000          3,270,000
                                                        CORE MEDIATECH, PT , Sewa Local Loop 20 Mbps
403    25-Oct-23      MANDIRI IDR       1220011559559   untuk Tenant BC Card periode 11 - 29 Agust 2023               2,672,258    2,451,613        269,677         49,032          2,672,258

                                                        PRIMACOM INTERBUANA, PT , Sewa Layanan Koneksi
                                                        Backhaul 1500Mbps Wisma Bumiputera (BBU) -
404    25-Oct-23      MANDIRI IDR       1220011559559   Balitower Regional Jawa Barat periode Sept 2023               3,270,000    3,000,000        330,000         60,000          3,270,000
                                                        PRIMACOM INTERBUANA, PT , Sewa Local Loop 25
                                                        Mbps Diskominfo Kota Bandung CCTV sebanyak 54
405    25-Oct-23      MANDIRI IDR       1220011559559   Titik periode Sept 2023                                      58,860,000   54,000,000      5,940,000       1,080,000        58,860,000
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                        Angsuran ke 1 (6 bulan) Sewa lt. 4 Office IKR periode
406    25-Oct-23      MANDIRI IDR       1220011559559   15 Oktober 2023 - 14 Oktober 2024                            67,872,000   67,200,000      7,392,000       6,720,000        67,872,000
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Tagihan
                                                        Angsuran ke 2 (6 bulan) Sewa lt. 4 Office IKR periode
407    25-Oct-23      MANDIRI IDR       1220011559559   15 Oktober 2023 - 14 Oktober 2024                            67,872,000   67,200,000      7,392,000       6,720,000        67,872,000
                                                        SERPONG MAS TELEMATIKA, PT , Biaya Sewa Core FO
                                                        2 core HH Pos Polisi - German Center periode Agust
408    25-Oct-23      MANDIRI IDR       1220011559559   2023                                                          1,635,000    1,500,000        165,000         30,000          1,635,000
Page 137
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 23
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                      BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                        Dedicated dan Broadband West BSD untuk 54 Tenant
409    25-Oct-23      MANDIRI IDR       1220011559559   periode Jul 2023                                           100,824,461    92,499,505   10,174,946       1,849,990       100,824,461
                                                        SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                        Dedicated dan Broadband West BSD untuk 53 Tenant
410    25-Oct-23      MANDIRI IDR       1220011559559   periode Agust 2023                                          83,478,740    76,586,000    8,424,460       1,531,720        83,478,740
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari PT CCSI ke WH
411    25-Oct-23      MANDIRI IDR       1220011559559   Matraman                                                       743,250      750,000         8,250         15,000            743,250
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Cable Optical dari PT Furukawa ke WH
412    25-Oct-23      MANDIRI IDR       1220011559559   Serpong                                                      2,398,000     2,200,000      242,000         44,000          2,398,000
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Battery Lithium 48V 100AH ZTE dari Office
413    25-Oct-23      MANDIRI IDR       1220011559559   Matraman ke WH Serpong                                       1,782,150     1,635,000      179,850         32,700          1,782,150
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material FO Cable Relokasi Non SJUT dari PT CCSI ke
414    25-Oct-23      MANDIRI IDR       1220011559559   PT Blao prima Perkasa                                        1,716,750     1,575,000      173,250         31,500          1,716,750
                                                        WAHANA MULTI LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari PT Furukawa ke PT Kaliabang Jaya
415    25-Oct-23      MANDIRI IDR       1220011559559   Pratama                                                        941,450      950,000        10,450         19,000            941,450
                                                        WAHANA MULTI LOGISTIK, PT , Biaya Pengiriman
                                                        Material Relokasi Jalan Gereja Theresia dari PT
416    25-Oct-23      MANDIRI IDR       1220011559559   Prysmian Cable ke PT Rona Persada Angkasa                    1,189,200     1,200,000       13,200         24,000          1,189,200
                                                        WAHANA MULTI LOGISTIK, PT , Biaya Pengiriman
                                                        Material Kabel dari PT Furukawa ke PT Simetrik
417    25-Oct-23      MANDIRI IDR       1220011559559   Integrasi                                                    1,025,685     1,035,000       11,385         20,700          1,025,685
                                                        SMARTFREN TELECOM TBK, PT , Internet Banndwith 5
418    25-Oct-23      MANDIRI IDR       1220011559559   site @50mbps (I : 8000001188)                               43,453,431    39,147,235    4,306,196              -         43,453,431
                                                        PPPRS KEBAGUSAN CITY , Uang Muka Beban Umum
                                                        atas Biaya Marketing Activity Balifiber di Apartment
419    25-Oct-23      MANDIRI IDR       1220011559559   Kebagusan City - Okt 2023                                    1,620,000     1,620,000          -                -          1,620,000
                                                        BALI UTAMA CAKRAWALA, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Discovery Shopping Mall Periode 29
420    25-Oct-23      MANDIRI IDR       1220011559559   Aug 2023 - 21 Sep 2023                                         157,576      156,017        17,160         15,601            157,576
                                                        TRIMITRA PUTRA MANDIRI, PT , Reimbursement
                                                        Salary Outsource Div. Direct Sales periode Sept 2023,
421    25-Oct-23      MANDIRI IDR       1220011559559   Insentif periode Agust 2023                                181,863,067   180,658,675    1,472,034        267,642        181,863,067
                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                        KONDOMINIUM TAMAN ANGGREK , Biaya Sewa
                                                        Penempatan Perangkat Telekomunikasi di Mall &
                                                        Kondominium Taman Anggrek Berdasarkan Profit
422     26-Oct-23       BCA IDR          3193058058     Sharing Periode September 2023                              11,313,316    12,570,351          -         1,257,035        11,313,316
                                                        MEGA AKSES PERSADA, PT , Biaya Instalasi dan Sewa
                                                        Jabalink Purwakarta (Fiberstar) 100Mbps periode 25 -
423    26-Oct-23      MANDIRI IDR       1220011559559   31 Agust 2023                                                4,201,775     3,854,839      424,032         77,096          4,201,775
                                                        MEGA AKSES PERSADA, PT , Sewa Jabalink Purwakarta
424    26-Oct-23      MANDIRI IDR       1220011559559   (Fiberstar) 100Mbps periode Sept 2023                        6,540,000     6,000,000      660,000        120,000          6,540,000
                                                        ASOSIASI PENYELENGGARA JASA INTERNET
                                                        INDONESIA , Biaya Penempatan Rak (S2) di APJII
425    26-Oct-23      MANDIRI IDR       1220011559559   Periode Okt 2023                                            10,900,000    10,000,000    1,100,000        200,000         10,900,000
                                                        FIBER NETWORKS INDONESIA, PT , Sewa Local Loop
                                                        30 Mbps - Pergudangan Puninar Yusen Periode Sept
426    26-Oct-23      MANDIRI IDR       1220011559559   2023                                                         4,360,000     4,000,000      440,000         80,000          4,360,000
                                                        PLN PERSERO, PT , Biaya pembelian token PLN 29 site
427    26-Oct-23      SINARMAS IDR       0002999994     kwh prabayar pemakaian bulan Nov 2023                       51,360,500    51,360,500          -                -         51,360,500
Page 138
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 24
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                            NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                       BANK          DPP            PPN             PPh         NET DIBAYARKAN

                                                        ZENZIVA ZETTA INDONESIA, PT , Uang Muka Beban
                                                        Umum atas Topup SMS Credit untuk Info & Reminder
428    27-Oct-23      MANDIRI IDR       1220011559559   Tagihanpelanggan FTTX 23 Okt - 31 Des 2023 - Trf           4,469,000     4,469,000          -                -          4,469,000

                                                        PEMERINTAH KOTA SURAKARTA , Uang Muka Beban
                                                        Umum atas Biaya Sewa Lahan FO 1 Ruas Jalan Wilayah
                                                        Kota Surakarta Periode 18 Maret 2023 s/d 18 Maret
429    30-Oct-23      MANDIRI IDR       1220011559559   2024 (Batch III) - PR : 1010035509 - Trf                   2,500,000     2,500,000          -                -          2,500,000
                                                        QONTAK TUMBUH MAKMUR, PT , Uang Muka Beban
                                                        Umum atas Biaya Top Up Whatsapp Conversation
430    30-Oct-23      MANDIRI IDR       1220011559559   Credit (Prepaid) - Oktober 2023 - Trf                     13,320,000    13,320,000          -                -         13,320,000
                                                        SATWIKA PERMAI INDAH, PT , Sewa Lahan Jalur Kabel
                                                        FO dari Jalan Boulevard Menuju Apt Permata Surya 1
431    30-Oct-23      MANDIRI IDR       1220011559559   periode 17 Jun 2023 - 16 Jun 2024                         40,400,000    40,000,000    4,400,000       4,000,000        40,400,000
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber 4core
                                                        segmen Mall Karawang - Karawang Regency periode
432    30-Oct-23      MANDIRI IDR       1220011559559   Agust 2023                                                 9,679,200     8,880,000      976,800        177,600          9,679,200
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber Section
                                                        25 3.965KM Pasirjaya-001 - Paledang-001 periode Okt
433    30-Oct-23      MANDIRI IDR       1220011559559   2023                                                       3,025,295     2,775,500      305,305         55,510          3,025,295
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber 2core
                                                        segmen HH Jl. Raya Serpong - HH Apartement
434    30-Oct-23      MANDIRI IDR       1220011559559   Amazana Residence periode Okt 2023                         6,342,385     5,818,702      640,057        116,374          6,342,385
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber 4core
                                                        segmen Mall Karawang - Karawang Regency periode
435    30-Oct-23      MANDIRI IDR       1220011559559   Okt 2023                                                   9,679,200     8,880,000      976,800        177,600          9,679,200

                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber Section
                                                        20 (2.562KM) Kedungbadak-008 - Tanah sareal-005,
                                                        Section 12 (1.780KM) Kencana-001 - Tanah Sareal-
                                                        005, Section 16 (1KM) Tanah Sareal-002 - Tanah
436    30-Oct-23      MANDIRI IDR       1220011559559   Sareal-005, Section 17, 22 dan 29 periode Okt 2023        11,240,134    10,312,050    1,134,325        206,241         11,240,134

                                                        POWER TELECOM, PT , Sewa Dark Fiber Segmen 11
                                                        (2.037KM) dan (2.038KM) Tegal Gundil-010 - Tanah
                                                        Sareal-005, Section 10 (2.830KM) & (2.831KM)
                                                        Narasoma - Tanah Sareal-005, Section 26 (2.270KM)
437    30-Oct-23      MANDIRI IDR       1220011559559   Cikaret-001 - Pasirjaya-001 periode Okt 2023               5,446,294     4,996,600      549,626         99,932          5,446,294
                                                        PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
438    30-Oct-23      MANDIRI IDR       1220011559559   Phase 10 Jabodatabek Periode Oktober 2023                252,449,500   252,449,500          -                -        252,449,500
                                                        PLN PERSERO, PT , Biaya Tagihan KWH PLN Pasca
439    31-Oct-23      MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode Oketober 2023             1,635,639     1,635,639          -                -          1,635,639
                                                        MARKETING COMMUNICATION , Uang Muka Beban
                                                        Umum atas Biaya Open Booth Balifiber di M-Town
440    31-Oct-23      MANDIRI IDR       1220011559559   periode Oktober - November 2023 - Trf                      2,424,000     2,424,000          -                -          2,424,000
                                                        WIJAYA KARYA REALTY, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Tamansari Parama Periode 01 Sep
441    31-Oct-23      MANDIRI IDR       1220011559559   2023 - 30 Sep 2023                                         1,206,697     1,231,323          -           24,626          1,206,697

                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Paket Data
442    31-Oct-23      MANDIRI IDR       1220011559559   Mikrotik Regional Jawa Timur Periode Oktober 2023            582,750      525,000        57,750              -            582,750
                                                        TECHNOLOGY DATA INDONESIA, PT , Tagihan
                                                        Reimbursement Listrik Rack No. Summer 243 Periode
443    31-Oct-23      MANDIRI IDR       1220011559559   Sept 2023                                                  5,341,000     4,900,000      539,000         98,000          5,341,000
Page 139
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 25
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        BUMI MULIA PERKASA DEVELOPMENT, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Atrium Mulia periode
444    31-Oct-23      MANDIRI IDR       1220011559559   Sep 2023                                                       232,423     230,122        25,313         23,012            232,423
                                                        YAYASAN PERHIMPUNAN PENGHUNI APARTEMEN
                                                        PESONA BAHARI , Sewa Penempatan Perangkat di
                                                        Apartemet Pesona Bahari periode 01 Sept 2023 - 31
445    31-Oct-23      MANDIRI IDR       1220011559559   Agust 2025                                                  21,600,000   24,000,000          -         2,400,000        21,600,000
                                                        INTILAND DEVELOPMENT TBK, PT (SURABAYA) , Sewa
                                                        Penempatan Perangkat Telekomunikasi Server MMR
                                                        B1 di Gedung Intiland periode Oct 2023
446    31-Oct-23      MANDIRI IDR       1220011559559                                                                4,040,000    4,000,000      440,000        400,000          4,040,000
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
447     1-Nov-23      MANDIRI IDR       1220011559559   Material MP26 dari PT DHJ ke WH Bali                        14,914,550   15,050,000      165,550        301,000         14,914,550
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
448     1-Nov-23      MANDIRI IDR       1220011559559   Material MP26 dari PT DHJ ke WH bali                        14,022,650   14,150,000      155,650        283,000         14,022,650
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
449     1-Nov-23      MANDIRI IDR       1220011559559   Material MP26 dari PT DHJ ke WH Bali                        14,914,550   15,050,000      165,550        301,000         14,914,550
                                                        GEMILANG CATUR PERSADA, PT , Biaya Sewa Local
                                                        Loop 2 Gbps (Alcen) - Omadata Surabaya periode Okt
450     1-Nov-23      MANDIRI IDR       1220011559559   2023                                                        28,132,000   25,810,000    2,838,000        516,000         28,132,000
                                                        ISMAWA TRIMITRA, PT , Sewa Penempatan Perangkat
                                                        di Gedung Graha Iskandarsyah periode 30 Jul 2023 -
451     1-Nov-23      MANDIRI IDR       1220011559559   29 Jul 2024                                                 20,200,000   20,000,000    2,200,000       2,000,000        20,200,000

                                                        INTERNETINDO DATA CENTRA INDONESIA, PT , Sewa
452     1-Nov-23      MANDIRI IDR       1220011559559   Crossconnect 3D 5 UTP dan 3D 3 FO periode Okt 2023           3,270,000    3,000,000      330,000         60,000          3,270,000
                                                        INTERNETINDO DATA CENTRA INDONESIA, PT ,
                                                        Tagihan Kelebihan Pemakaian Listrik Rack No Winter
453     1-Nov-23      MANDIRI IDR       1220011559559   233 Per 1 - 30 Sept 2023 (IDC Indonesia)                    11,445,000   10,500,000    1,155,000        210,000         11,445,000
                                                        TECHNOLOGY DATA INDONESIA, PT , Biaya Sewa Rack
                                                        Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
454     1-Nov-23      MANDIRI IDR       1220011559559   Periode 1 s/d 31 Okt 2023                                    7,630,000    7,000,000      770,000        140,000          7,630,000
                                                        OMADATA PADMA INDONESIA, PT , Biaya Service
455     1-Nov-23      MANDIRI IDR       1220011559559   Charge Sewa MMR periode Okt 2023                               327,000     300,000        33,000          6,000            327,000
                                                        OMADATA PADMA INDONESIA, PT , Biaya Sewa
                                                        Management Cable - MMR 1U OTB Periode Okt 2023
456     1-Nov-23      MANDIRI IDR       1220011559559   (Omadata)                                                    1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        OMADATA PADMA INDONESIA, PT , Biaya Sewa
                                                        Management Cable MMR 1U Open Rack Periode Okt
457     1-Nov-23      MANDIRI IDR       1220011559559   2023                                                         2,180,000    2,000,000      220,000         40,000          2,180,000
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Box KWH Meter dari PT Nobi Putra Angkasa
458     1-Nov-23      MANDIRI IDR       1220011559559   ke WH Serpong                                                  495,500     500,000         5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADDSS 24 Core dari PT CCSI ke WH
459     1-Nov-23      MANDIRI IDR       1220011559559   Matraman                                                       743,250     750,000         8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
460     1-Nov-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                   495,500     500,000         5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
461     1-Nov-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                   495,500     500,000         5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Relokasi FO Akses Purwosari-002 dari PT CCSI
462     1-Nov-23      MANDIRI IDR       1220011559559   ke PT Banyu Manunggal Sejahtera                              1,882,900    1,900,000       20,900         38,000          1,882,900
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 48 Core dari PT Prysmian Cable
463     1-Nov-23      MANDIRI IDR       1220011559559   ke Office Sidoarjo                                           2,477,500    2,500,000       27,500         50,000          2,477,500
Page 140
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 26
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Panel Box KWH dari WH Serpong ke WH
464     1-Nov-23      MANDIRI IDR       1220011559559   Matraman                                                       495,500      500,000         5,500         10,000            495,500
                                                        INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                        Sinyal untuk Tenant di Gedung Thamrin Nine
465     1-Nov-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Agustus 2023                     19,036,500    17,150,000    1,886,500              -         19,036,500

                                                        INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                        Sinyal untuk Tenant di Gedung The Plaza Office Tower
466     1-Nov-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Agustus 2023                     66,035,750    59,491,667    6,544,083              -         66,035,750
                                                        INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                        Sinyal untuk Tenant di Gedung MSIG Berdasarkan
467     1-Nov-23      MANDIRI IDR       1220011559559   Profit Sharing Agustus 2023                                 51,698,250    46,575,000    5,123,250              -         51,698,250

                                                        WAHANARIA CEMERLANG, PT , Uang Muka Beban
                                                        Umum atas Biaya renewal sewa site Sosromenduran-
                                                        002/ 730197 Priority Smartfren - DIY periode 8 Okt 23
468     1-Nov-23      MANDIRI IDR       1220011559559   s/d 7 Okt 28 - PR : 1010035616 - Trf                       168,525,000   168,525,000          -                -        168,525,000
                                                        ARYAVENTURA REALTY, PT , Biaya atas Pemakaian
469     1-Nov-23      MANDIRI IDR       1220011559559   Listrik di Gedung Aryaventura periode Sep 2023                 196,082      194,141        21,355         19,414            196,082

                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Local Loop
470     2-Nov-23      MANDIRI IDR       1220011559559   Jaringan Access Point 70 Titik periode Nov 2022             78,037,298    71,593,851    7,875,324       1,431,877        78,037,298

                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Local Loop
471     2-Nov-23      MANDIRI IDR       1220011559559   Jaringan Access Point 70 Titik periode Okt 2022             79,187,736    72,649,298    7,991,423       1,452,985        79,187,736

                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Local Loop
472     2-Nov-23      MANDIRI IDR       1220011559559   Jaringan Access Point 70 Titik periode Sept 2022            78,251,337    71,790,217    7,896,924       1,435,804        78,251,337

                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Local Loop
473     2-Nov-23      MANDIRI IDR       1220011559559   Jaringan Access Point 70 Titik periode Agust 2022           77,392,074    71,001,903    7,810,209       1,420,038        77,392,074

                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Local Loop
474     2-Nov-23      MANDIRI IDR       1220011559559   Jaringan Access Point 70 Titik periode Des 2022             77,243,240    70,865,358    7,795,189       1,417,307        77,243,240
                                                        PLN PERSERO, PT , Biaya Pembelian pulsa prabayar
475     3-Nov-23      SINARMAS IDR       0002999994     site baru 211240 sading-002 dan Admin Rp.10.000,             3,510,000     3,510,000          -                -          3,510,000
                                                        BIBIT , Biaya Pekerjaan Perbaikan Kabel Power di Pole
                                                        6 Kawasan Pantai Melasti ( PO Rp.3.258.948,-
476     3-Nov-23      SINARMAS IDR       0002999994     Potongan PPh 21(9%) Rp. 293.305,- )                          2,965,643     3,258,948          -          293,305          2,965,643
                                                        DINAS PENDAPATAN DAERAH , Biaya pembayaran
                                                        Pajak Bumi dan Bangunan tower wilayah Badung
477     3-Nov-23      SINARMAS IDR       0002999994     Utara periode th 2023                                       16,100,042    16,100,042          -                -         16,100,042

                                                        ANGKASA PURA SUPPORT, PT , Pembayaran Tagihan
                                                        Listrik Angkasa pura untuk site M_335 area Kargo,
                                                        M_334 AP Bali -Kantor Imigrasi, M_331 AP Bali -Hotel
                                                        Haris, M_332 AP Bali-Area Parkir, dan M_333 AP Bali -
478     3-Nov-23      MANDIRI IDR       1220011559559   Departure Area Periode Aug 2023                             15,102,315    13,855,334    1,524,087        277,106         15,102,315
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material ODC, Door lock dari PT Nobi Putra Angkasa
479     3-Nov-23      MANDIRI IDR       1220011559559   ke WH Bali                                                   6,887,450     6,950,000       76,450        139,000          6,887,450
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Pole 7M dari PT Fiber Art Trans Network ke
480     3-Nov-23      MANDIRI IDR       1220011559559   WH Bali                                                     14,369,500    14,500,000      159,500        290,000         14,369,500
                                                        MEKAR PRANA INDAH, PT , Biaya atas Pemakaian
481     3-Nov-23      MANDIRI IDR       1220011559559   Listrik di Menara Bidakara 2 periode Sep 2023                  265,251      262,625        28,888         26,262            265,251
Page 141
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 27
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                       BANK          DPP             PPN             PPh        NET DIBAYARKAN
                                                        PERHIMPUNAN PENGHUNI GRAHA IRAMA , Biaya atas
                                                        Pemakaian Listrik di Gedung Graha Irama periode 01
482     3-Nov-23      MANDIRI IDR       1220011559559   Sep 2023 - 01 Oct 2023                                          130,185     144,649             -           14,464           130,185
                                                        TERAS NIRWANA BALI, PT , Biaya atas Pemakaian
                                                        Listrik di The CEO Building Periode 20 Aug 2022 - 19
483     3-Nov-23      MANDIRI IDR       1220011559559   Sep 2023                                                        120,796     119,600          13,156         11,960           120,796
                                                        PENGELOLA MASPION PLAZA GUNUNG SAHARI , Biaya
                                                        atas Pemakaian Listrik di Gedung Maspion Plaza Lt. 5A
484     3-Nov-23      MANDIRI IDR       1220011559559   periode Sep 2023                                                193,672     215,191             -           21,519           193,672

                                                        PLAZA INDONESIA REALTY TBK, PT , Biaya atas
485     3-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Plaza Indonesia periode Aug 2023           414,376     410,273          45,130         41,027           414,376

                                                        PLAZA INDONESIA REALTY TBK, PT , Biaya atas
486     3-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Plaza Indonesia periode Sep 2023           435,336     431,026          47,412         43,102           435,336
                                                        PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                        PERKANTORAN GRAHA SURVEYOR INDONESIA , Biaya
                                                        atas Pemakaian Listrik di Gedung Surveyor Lt.P2
487     3-Nov-23      MANDIRI IDR       1220011559559   periode 22 Aug 2023 - 22 Sep 2023                               351,559     390,621             -           39,062           351,559
                                                        PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                        PERKANTORAN GRAHA SURVEYOR INDONESIA , Biaya
                                                        atas Pemakaian Listrik di Gedung Surveyor Lt.11
488     3-Nov-23      MANDIRI IDR       1220011559559   periode 22 Aug 2023 - 22 Sep 2023                               312,458     347,175             -           34,717           312,458
                                                        PERHIMPUNAN PENGHUNI MENARA KADIN
                                                        INDONESIA , Biaya atas Pemakaian Listrik di Gedung
489     3-Nov-23      MANDIRI IDR       1220011559559   Menara Kadin periode Aug 2023                                   350,541     389,489             -           38,948           350,541
                                                        PERHIMPUNAN PENGHUNI MENARA KADIN
                                                        INDONESIA , Biaya atas Pemakaian Listrik di Gedung
490     3-Nov-23      MANDIRI IDR       1220011559559   Menara Kadin periode Sep 2023                                   350,541     389,489             -           38,948           350,541

                                                        PETARUNG TANGGUH PERSADA, PT , Biaya atas
491     3-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Mal Bali Galeria periode Sep 2023          548,691     543,258          59,758         54,325           548,691
                                                        DWIBINA PRIMA, PT , Biaya atas Pemakaian Listrik di
492     3-Nov-23      MANDIRI IDR       1220011559559   Wisma BSG periode Sep 2023                                       86,330         85,475        9,402          8,547            86,330

                                                        LIZA CHRISTINA GARMENT INDUSTRY, PT , Biaya atas
493     3-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Unity Building periode Sep 2023            505,000     500,000          55,000         50,000           505,000
                                                        INTILAND DEVELOPMENT TBK, PT (SURABAYA) , Biaya
                                                        atas Pemakaian Listrik di Gedung Intiland Surabaya
494     3-Nov-23      MANDIRI IDR       1220011559559   periode Sep 2023                                                807,266     799,273          87,920         79,927           807,266
                                                        SAINATH REALINDO, PT , Biaya atas Pemakaian Listrik
495     3-Nov-23      MANDIRI IDR       1220011559559   di Gedung Sainath Tower periode Sep 2023                         85,066         94,517          -            9,451            85,066
                                                        MENARA DUTA, PT , Biaya atas Pemakaian Listrik
496     3-Nov-23      MANDIRI IDR       1220011559559   Menara Duta Periode Sep 2023                                    142,122     140,714          15,479         14,071           142,122
                                                        MENARA THAMRIN, PT , Biaya atas Pemakaian Listrik
                                                        di Gedung Menara Thamrin Suite 21 & 6 periode Sep
497     3-Nov-23      MANDIRI IDR       1220011559559   2023                                                            230,355     228,074          25,088         22,807           230,355
                                                        MENARA THAMRIN, PT , Sewa Shaft untuk Tenant
                                                        Catur Global Logistik di Gedung Menara Thamrin
498     3-Nov-23      MANDIRI IDR       1220011559559   periode 15 Apr 2023 - 14 Apr 2024                             2,525,000    2,500,000        275,000        250,000         2,525,000
                                                        MENARA THAMRIN, PT , Sewa Shaft untuk Tenant
                                                        Bank Of India di Gedung Menara Thamrin periode 20
499     3-Nov-23      MANDIRI IDR       1220011559559   Mar 2023 - 19 Mar 2024                                        2,525,000    2,500,000        275,000        250,000         2,525,000
                                                        MENARA THAMRIN, PT , Sewa Shaft untuk Tenant Yan
                                                        Apul & Rekan di Gedung Menara Thamrin periode 08
500     3-Nov-23      MANDIRI IDR       1220011559559   Apr 2023 - 07 Apr 2024                                        2,525,000    2,500,000        275,000        250,000         2,525,000
Page 142
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 28
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                      BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        MENARA THAMRIN, PT , Sewa Shaft untuk Tenant
                                                        Olmix Idn Nutrition di Gedung Menara Thamrin
501     3-Nov-23      MANDIRI IDR       1220011559559   periode 11 Feb 2023 - 10 Feb 2024                            2,525,000    2,500,000      275,000        250,000          2,525,000
                                                        MENARA THAMRIN, PT , Sewa Shaft untuk Tenant
                                                        Indo Pratama Teleglobal di Gedung Menara Thamrin
502     3-Nov-23      MANDIRI IDR       1220011559559   periode 18 Mar 2023 - 17 Mar 2024                            2,525,000    2,500,000      275,000        250,000          2,525,000
                                                        MENARA THAMRIN, PT , Sewa Shaft untuk Tenant
                                                        Bank Mandiri di Gedung Menara Thamrin periode 14
503     3-Nov-23      MANDIRI IDR       1220011559559   Jan 2023 - 13 Jan 2024                                       2,525,000    2,500,000      275,000        250,000          2,525,000
                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
504     3-Nov-23      MANDIRI IDR       1220011559559   Listrik di The Springlake View periode Sep 2023                766,449     758,860        83,475         75,886            766,449

                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
505     3-Nov-23      MANDIRI IDR       1220011559559   Listrik di The Springlake Apartement periode Sep 2023          529,294     524,053        57,646         52,405            529,294
                                                        KHARISMA INTAN PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Scientia Business Park periode
506     3-Nov-23      MANDIRI IDR       1220011559559   Sep 2023                                                       184,605     182,777        20,105         18,277            184,605
                                                        PURIAMPERA INTIPRATAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Ad Premier Periode Sep
507     3-Nov-23      MANDIRI IDR       1220011559559   2023                                                           242,527     240,126        26,413         24,012            242,527
                                                        GRAHANIAGA TATAUTAMA, PT , Biaya atas
                                                        pemakaian Listrik di Gedung Graha Niaga Tatautama
508     3-Nov-23      MANDIRI IDR       1220011559559   Periode 21/08/2023 - 20/09/2023                                232,658     230,354        25,339         23,035            232,658
                                                        CORE MEDIATECH, PT , Sewa Local Loop 10 Mbps
509     3-Nov-23      MANDIRI IDR       1220011559559   untuk Tenant BC Card periode 15 - 30 Sept 2023               1,802,133    1,653,333      181,866         33,066          1,802,133
                                                        CORE MEDIATECH, PT , Sewa Local Loop 10 Mbps
510     3-Nov-23      MANDIRI IDR       1220011559559   untuk Tenant BC Card periode Okt 2023                        3,379,000    3,100,000      341,000         62,000          3,379,000
                                                        INTERNETINDO DATA CENTRA INDONESIA, PT , Biaya
                                                        Sewa Penambahan Redundant Power Source Rack
511     3-Nov-23      MANDIRI IDR       1220011559559   Winter 233 periode Okt 2023                                  2,180,000    2,000,000      220,000         40,000          2,180,000
                                                        TRANS INDONESIA SUPERKORIDOR, PT , Sewa
                                                        Intercity IDC Duren Tiga - RK0004 Office Gatot
512     3-Nov-23      MANDIRI IDR       1220011559559   Subroto periode 01 - 30 Sept 2023                            9,265,000    8,500,000      935,000        170,000          9,265,000
                                                        ROOSLINAWATI PERWATA DAN SETIADY PERWATA ,
                                                        Sewa Penempatan Perangkat di Gedung Perwata
                                                        Tower Landmark E12 periode26 Mei 2023 - 27 Mei
513     3-Nov-23      MANDIRI IDR       1220011559559   2024                                                        11,880,000   13,200,000          -         1,320,000        11,880,000
                                                        PRIMACOM INTERBUANA, PT , Sewa Local Loop
                                                        10Mbps Diskominfo Kota Bandung sebanyak 30 Site
514     3-Nov-23      MANDIRI IDR       1220011559559   CCTV periode Sept 2023                                      26,160,000   24,000,000    2,640,000        480,000         26,160,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Sewa
                                                        Crossconnect Fiber Optic in Data Center CDCI - 1 Port
515     3-Nov-23      MANDIRI IDR       1220011559559   REQ/21FEB19/00000008 periode Okt 2023                        1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Biaya Sewa
                                                        Crossconnect Additional 3 Port FO di CDC periode Okt
516     3-Nov-23      MANDIRI IDR       1220011559559   2023                                                         4,905,000    4,500,000      495,000         90,000          4,905,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Sewa
                                                        Crossconnect Fiber Optic in Data Center CDCI - 1 Port
                                                        REQ/23MAR20/00000008 Port 51 CID periode Okt
517     3-Nov-23      MANDIRI IDR       1220011559559   2023                                                         1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Sewa Full
518     3-Nov-23      MANDIRI IDR       1220011559559   Rack Server Cabinet 45U periode Sept 2023                   10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                        MEDIA NUSANTARA DATA GLOBAL, PT , Biaya Sewa
519     3-Nov-23      MANDIRI IDR       1220011559559   Collocation IU OTB Fiber in NER periode Sept 2023            2,180,000    2,000,000      220,000         40,000          2,180,000
                                                        MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
520     3-Nov-23      MANDIRI IDR       1220011559559   Aplikasi Call Center Centerix periode Okt 2023              10,900,000   10,000,000    1,100,000        200,000         10,900,000
Page 143
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 29
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                                NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
                                                        Aplikasi Call Center Centerix periode Okt 2023
521     3-Nov-23      MANDIRI IDR       1220011559559   (Additional 5qty)                                              5,450,000    5,000,000      550,000        100,000          5,450,000
                                                        MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
                                                        Aplikasi Call Center Centerix periode Okt 2023
522     3-Nov-23      MANDIRI IDR       1220011559559   (Additional 10qty)                                            10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                        MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
                                                        Aplikasi Call Center Centerix periode 17 Sept 2023 - 16
523     3-Nov-23      MANDIRI IDR       1220011559559   Okt 2023 (Additional 10qty)                                   10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                        WAHANAGRIYA ANEKA PESONA, PT , Sewa
                                                        Penempatan Perangkat di Gedung Graha Anugerah
524     3-Nov-23      MANDIRI IDR       1220011559559   periode 26 Sept 2022 - 25 Sept 2023                           15,150,000   15,000,000    1,650,000       1,500,000        15,150,000
                                                        WAHANAGRIYA ANEKA PESONA, PT , Sewa
                                                        Penempatan Perangkat di Gedung Graha Anugerah
525     3-Nov-23      MANDIRI IDR       1220011559559   periode 26 Sept 2021 - 25 Sept 2022                           15,150,000   15,000,000    1,650,000       1,500,000        15,150,000
                                                        ARAYA MEDIA, CV , Sewa Local Loop 100Mbps
                                                        Omadata DC ke Prambon Sidoarjo untuk Tenant PT
526     3-Nov-23      MANDIRI IDR       1220011559559   Argo Boga Utama periode Okt 2023                               5,995,000    5,500,000      605,000        110,000          5,995,000
                                                        ARAYA MEDIA, CV , Sewa Local Loop 100Mbps
                                                        Omadata DC ke Prambon Sidoarjo untuk Tenant PT
527     3-Nov-23      MANDIRI IDR       1220011559559   Argo Boga Utama periode Sept 2023                              5,995,000    5,500,000      605,000        110,000          5,995,000
                                                        SERPONG MAS TELEMATIKA, PT , Sewa Local Loop 30
                                                        Mbps (BOD) PT Serpong Mas Telematika untuk Tenant
                                                        PT Kitatama Prima Sentosa di Auditorium GOP 9
528     3-Nov-23      MANDIRI IDR       1220011559559   Periode 10 Juni 2023 (1 Hari)                                  1,923,850    1,765,000      194,150         35,300          1,923,850
                                                        QUIROS NETWORKS, PT , Biaya Pemakaian Telepon
529     3-Nov-23      MANDIRI IDR       1220011559559   Call Center Bulan Sept 2023                                   12,222,898   11,011,620    1,211,278              -         12,222,898

                                                        JALA LINTAS MEDIA, PT , Sewa Local Loop 10Mbps IDC
530     3-Nov-23      MANDIRI IDR       1220011559559   to PT Darya Varia Laboratoria periode Okt 2023                 2,180,000    2,000,000      220,000         40,000          2,180,000
                                                        JALA LINTAS MEDIA, PT , Sewa Local Loop 10 Mbps &
                                                        20 Mbps Tenant Citeureup dan Gunung Putri (VLAN)
531     3-Nov-23      MANDIRI IDR       1220011559559   periode Okt 2023                                               9,265,000    8,500,000      935,000        170,000          9,265,000

                                                        APLIKANUSA LINTASARTA, PT , Sewa Local Loop 150
                                                        Mbps IDC Duren Tiga - Angkasa Pura 2 untuk Tenant
532     3-Nov-23      MANDIRI IDR       1220011559559   PT Pandu Pintar Multifokus periode Jun 2023                   47,415,000   43,500,000    4,785,000        870,000         47,415,000

                                                        APLIKANUSA LINTASARTA, PT , Sewa Local Loop 150
                                                        Mbps IDC Duren Tiga - Angkasa Pura 2 untuk Tenant
533     3-Nov-23      MANDIRI IDR       1220011559559   PT Pandu Pintar Multifokus periode Jul 2023                   47,415,000   43,500,000    4,785,000        870,000         47,415,000

                                                        APLIKANUSA LINTASARTA, PT , Biaya Instalasi dan
                                                        Sewa Local Loop 150 Mbps IDC Duren Tiga - Angkasa
                                                        Pura 2 untuk Tenant PT Pandu Pintar Multifokus
534     3-Nov-23      MANDIRI IDR       1220011559559   peride 04 - 30 Apr 2023 dan periode Mei 2023                 104,803,500   96,150,000   10,576,500       1,923,000       104,803,500
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material Cable, Modular, JC dari WH Serpong ke
535     3-Nov-23      MANDIRI IDR       1220011559559   Office Surabaya dan WH Bali                                    8,844,675    8,925,000       98,175        178,500          8,844,675
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari PT Prysmian Cable ke PT Banyu
536     3-Nov-23      MANDIRI IDR       1220011559559   Manunggal Sejahtera                                              594,600     600,000         6,600         12,000            594,600
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari WH Serpong ke PT Skill Globalindo
537     3-Nov-23      MANDIRI IDR       1220011559559   Sukses                                                         2,873,900    2,900,000       31,900         58,000          2,873,900
Page 144
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                            Page 30
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                           NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                    BANK          DPP           PPN             PPh        NET DIBAYARKAN
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari PT CCSI ke PT Intisel
538     3-Nov-23      MANDIRI IDR       1220011559559   Prodaktifakom                                               743,250     750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Return FO Akses POI H3I Cikupa dari PT
539     3-Nov-23      MANDIRI IDR       1220011559559   Cakrawala Energi Nusantara ke WH Serpong                    495,500     500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
540     3-Nov-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                495,500     500,000         5,500         10,000           495,500
                                                        BERUANG ADVERTISING SOLUSINDO, PT , Pembelian
                                                        Spanduk Balifiber Mitra Untuk Periode Oktober 2023
541     3-Nov-23      MANDIRI IDR       1220011559559   Sebanyak 4 Pcs                                              218,000     200,000        22,000          4,000           218,000
                                                        WAHANARIA CEMERLANG, PT , Biaya Listrik di Hotel
                                                        Ibis Styles Yogyakarta Lantai 6 site Sosromenduran
542     3-Nov-23      MANDIRI IDR       1220011559559   002 periode September 2023                                2,634,221    2,926,912          -          292,691         2,634,221
                                                        SIDO AGUNG MANDIRI, PT , Pembelian Patchcord
                                                        FC/UPC-FC/UPC SM Duplex 5 Mtr Sebanyak 50 Pcs,
                                                        Patchcord LC/UPC-SC/UPC SM Duplex 3 Mtr Sebanyak
543     3-Nov-23      MANDIRI IDR       1220011559559   30 Pcs                                                    2,403,150    2,165,000      238,150              -         2,403,150
                                                        SIDO AGUNG MANDIRI, PT , Pembelian Patchcord
544     3-Nov-23      MANDIRI IDR       1220011559559   LC/UPC-SC/UPC SM Duplex 5 Mtr Sebanyak 10 Pcs               310,800     280,000        30,800              -           310,800
                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian Joint
                                                        Closure 96 Core Sebanyak 40 Unit untuk Kebutuhan
545     3-Nov-23      MANDIRI IDR       1220011559559   Cellular Operation                                       23,310,000   21,000,000    2,310,000              -        23,310,000

                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian Bracket
                                                        Dead End 96 Core 50 Set, Bracket Dead End 24 Core
546     3-Nov-23      MANDIRI IDR       1220011559559   50 Set, Bracket Dead End 48 Core 50 Set                   3,468,750    3,125,000      343,750              -         3,468,750
                                                        PUTERATEL ANDALAN SUKSES, PT , Pembelian Bracket
                                                        Suspension D 70-95mm 96 Core 30 Set, Optical
547     3-Nov-23      MANDIRI IDR       1220011559559   Splitter Blade 1:2 SC/APC 20 Unit, dll                    5,977,350    5,385,000      592,350              -         5,977,350

                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
548     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Sukamaju Baru-005            420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
549     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Kayu Putih-022               420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
550     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Kalideres-041                420,420     431,200           -           10,780           420,420

                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
551     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Cipinang Muara-004           420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
552     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Malaka Jaya-007              420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
553     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Meruya Utara-035             420,420     431,200           -           10,780           420,420

                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
554     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Pondok Kelapa-015            420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
555     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Cakung Timur-016             420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                        Pengelasan RRU Tenant IOH Site Halim Perdana
556     3-Nov-23      MANDIRI IDR       1220011559559   Kusuma-067                                                  420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
557     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Pulo Gadung-003              420,420     431,200           -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
558     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Penggilingan-010             420,420     431,200           -           10,780           420,420
Page 145
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 31
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
559     3-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Medan Satria-006                 420,420      431,200           -           10,780            420,420
                                                        LINK NET TBK, PT , Link Net IDC D3 Jakarta to NIX Bali
560     3-Nov-23      MANDIRI IDR       1220011559559   B00573-009 10Gbps periode Okt 2023                          201,650,000   185,000,000   20,350,000       3,700,000       201,650,000
                                                        MEGA AKSES PERSADA, PT , Sewa Local Loop 10 Mbps
                                                        site Wisma Barito Pasific I Slipi Kec. Palmerah
                                                        kebutuhan PT Kyndryl Solutions Indonesia periode
561     3-Nov-23      MANDIRI IDR       1220011559559   Okt 2023                                                      2,289,000     2,100,000      231,000         42,000          2,289,000
                                                        MEGA AKSES PERSADA, PT , Biaya Instalasi dan Sewa
                                                        Local Loop 10 Mbps site Wisma Barito Pasific I Slipi
                                                        Kec. Palmerah kebutuhan PT Kyndryl Solutions
562     3-Nov-23      MANDIRI IDR       1220011559559   Indonesia periode 06 - 31 Agust 2023                          4,644,806     4,261,290      468,741         85,225          4,644,806
                                                        MEGA AKSES PERSADA, PT , Sewa Local Loop 10 Mbps
                                                        site Wisma Barito Pasific I Slipi Kec. Palmerah
                                                        kebutuhan PT Kyndryl Solutions Indonesia periode
563     3-Nov-23      MANDIRI IDR       1220011559559   Sept 2023                                                     2,289,000     2,100,000      231,000         42,000          2,289,000
                                                        MULIA CEMERLANG DIAN PERSADA, PT , Biaya atas
564     3-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Wisma GKBI periode Sep 2023                499,712      494,764        54,424         49,476            499,712
                                                        CYBER TEKNOLOGI PUTRAWAN, PT , Tagihan Revenue
                                                        Sharing atas Pendapatan Penggunaan Jaringan Kabel
                                                        Fiber Optik periode Juli - September 2023 di Bali
565     3-Nov-23      MANDIRI IDR       1220011559559   Pecatu Graha New Kuta Beach                                  12,295,200    11,280,000    1,240,800        225,600         12,295,200
                                                        BALI UTAMA CAKRAWALA, PT , Biaya Penempatan
                                                        Sewa Perangkat Telekomunikasi di Discovery
                                                        Shopping Mall berdasarkan Revenue Sharing periode
566     3-Nov-23      MANDIRI IDR       1220011559559   Juli - Agustus 2023                                          20,419,095    20,216,925    2,223,862       2,021,692        20,419,095

                                                        MULIA INTIPELANGI, PT , Biaya atas Pemakaian Listrik
567     3-Nov-23      MANDIRI IDR       1220011559559   Mall Taman Anggrek (GL-L5) Periode Jul 2023                   3,800,499     3,762,870      413,916        376,287          3,800,499
                                                        PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
568     3-Nov-23      MANDIRI IDR       1220011559559   Pluit B/10 periode Sep 2023                                     316,296      316,296           -                -            316,296
                                                        PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
569     3-Nov-23      MANDIRI IDR       1220011559559   Pluit LG-04 periode Sep 2023                                    431,157      431,157           -                -            431,157
                                                        MDT TOTAL SOLUTION, PT , Pembelian Joint Closure
                                                        24 core Sebanyak 5 Unit, Joint Closure 48 Core
                                                        Sebanyak 5 Unit untuk untuk Kebutuhan Stock
570     7-Nov-23      MANDIRI IDR       1220011559559   Operation Region Jawa Tengah                                  3,163,500     2,850,000      313,500              -          3,163,500

                                                        MDT TOTAL SOLUTION, PT , Pembelian Patchcord MM
571     7-Nov-23      MANDIRI IDR       1220011559559   Duplex LC/UPC-LC/UPC 3MM 3M Sebanyak 20 Roll                    710,400      640,000        70,400              -            710,400
                                                        PPPSRS PERKANTORAN EKSEKUTIF SATRIO TOWER ,
                                                        Biaya atas Pemakaian Listrik di Gedung Satrio Tower
572     7-Nov-23      MANDIRI IDR       1220011559559   periode Sep 2023                                                200,464      198,480        21,832         19,848            200,464
                                                        PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                        KIRANA TWO , Uang Muka Beban Umum atas Biaya
                                                        Sponsorship Event Tenant Gathering Kirana Two -
573     7-Nov-23      MANDIRI IDR       1220011559559   November 2023 -Trf                                            1,500,000     1,500,000          -                -          1,500,000
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 11
574     7-Nov-23      MANDIRI IDR       1220011559559   periode 21 Aug 2023 - 20 Sep 2023                               232,093      229,795        25,277         22,979            232,093
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
575     7-Nov-23      MANDIRI IDR       1220011559559   periode 21 Aug 2023 - 20 Sep 2023                               215,843      213,706        23,507         21,370            215,843
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 29
576     7-Nov-23      MANDIRI IDR       1220011559559   periode 21 Aug 2023 - 20 Sep 2023                               215,843      213,706        23,507         21,370            215,843
Page 146
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 32
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                      BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        ASSET PACIFIC, PT , Sewa Penempatan Perangkat di
                                                        Gedung Menara Salemba periode 01 Agust 2023 - 31
577     7-Nov-23      MANDIRI IDR       1220011559559   Jul 2024                                                    15,150,000   15,000,000      1,650,000       1,500,000        15,150,000
                                                        ASSET PACIFIC, PT , Biaya atas Pemakaian Listrik di
578     7-Nov-23      MANDIRI IDR       1220011559559   Gedung Menara Salemba periode Aug 2023                         121,338     120,136          13,215         12,013            121,338
                                                        FIBER NETWORKS INDONESIA, PT , Sewa Local Loop
                                                        30 Mbps - Pergudangan Puninar Yusen Periode Okt
579     7-Nov-23      MANDIRI IDR       1220011559559   2023                                                         4,360,000    4,000,000        440,000         80,000          4,360,000
                                                        CYBERINDO ADITAMA, PT , Biaya Crossconnect FO
                                                        CBN Tenant PT Keb Hana Bank KCP Central Park Bulan
580     7-Nov-23      MANDIRI IDR       1220011559559   Okt 2023                                                     3,052,000    2,800,000        308,000         56,000          3,052,000
                                                        CYBERINDO ADITAMA, PT , Biaya Sewa Local Loop
                                                        100Mbps site Menara Jamsostek untuk Tenant PT
581     7-Nov-23      MANDIRI IDR       1220011559559   Pamerindo Indonesia periode Okt 2023                         7,630,000    7,000,000        770,000        140,000          7,630,000
                                                        XL AXIATA TBK, PT , Biaya Tagihan Pasca Bayar
                                                        Pembelian Pulsa XL Mikrotik (Monitoring NOC)
                                                        Periode Oktober 2023 (Pemakaian September 2023-
582     7-Nov-23      MANDIRI IDR       1220011559559   Jabodetabek Area (10 Site)                                   1,010,100     910,000         100,100              -          1,010,100
                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian Pigtail
583     8-Nov-23        BCA IDR          3193058058     SM FC/UPC 0.9MM 1.5M Sebanyak 30 Pcs                           231,768     208,800          22,968              -            231,768
                                                        PLN PERSERO, PT , 315 - Biaya reimbursement tagihan
                                                        PLN Pascabayar periode September dan Oktober site
584     8-Nov-23      MANDIRI IDR       1220011559559   705247 Jagakarsa-004                                           306,754     306,754             -                -            306,754
                                                        PLN PERSERO, PT , Biaya pembayaran tagihan PLN
                                                        Pascabayar periode Agustus 2023 site Pejaten Barat-
585     8-Nov-23      MANDIRI IDR       1220011559559   001                                                             58,508         58,508          -                -             58,508
                                                        SHOPEE INDONESIA , Biaya Pembelian adaftor
                                                        sebanyak 30 pcs untuk keperluan di site-departeman
586     8-Nov-23      MANDIRI IDR       1220011559559   FTTX Ops-bulan Oktober 2023                                    466,000     466,000             -                -            466,000
                                                        TOKOPEDIA, PT , Biaya Pembelian tempered glass
                                                        sebanyak 4 pcs untuk keperluan di site dan Pembelian
                                                        case walet sebanyak 4 pcs untuk keperluan HP
587     8-Nov-23      MANDIRI IDR       1220011559559   Operational                                                    183,300     183,300             -                -            183,300
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Top Up Paket
                                                        Data Mikrotik site Sriwijaya MP, West Java Periode
588     8-Nov-23      MANDIRI IDR       1220011559559   Oktober 2023                                                   102,000     102,000             -                -            102,000
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Top Up Paket
                                                        Data Mikrotik site Nageri Kaler-008, West Java
589     8-Nov-23      MANDIRI IDR       1220011559559   Periode September 2023                                          53,000         53,000          -                -             53,000
                                                        CELLULAR OPERATION SUPPORT , Biaya TKBM 1 orang
                                                        untuk pekerjaan angkut kayu ex husbel kabel FO office
                                                        Matraman 19 September 2023, 25 September 2023,
590     8-Nov-23      MANDIRI IDR       1220011559559   dan 06 Oktober 2023                                            450,000     463,917             -           13,917            450,000
                                                        TOKOPEDIA, PT , Biaya pembelian material untuk
                                                        Untuk Keperluan Installasi Tim Corporate Building &
591     8-Nov-23      MANDIRI IDR       1220011559559   In House Project                                             1,178,099    1,178,099            -                -          1,178,099
                                                        PLN PERSERO, PT , Biaya Pengisian Top Up Token KWH
592     8-Nov-23      MANDIRI IDR       1220011559559   Listrik Site Cikutra Tmp                                        51,500         51,500          -                -             51,500

                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                        Tagihan Kompensasi Persentase Revenue Sharing
593     9-Nov-23      MANDIRI IDR       1220011559559   Triwulan III/2022 Periode 01 Juli - 30 September 2022       62,306,692   61,689,794      6,785,877       6,168,979        62,306,692
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Pole 7M dari PT Fiber Art Trans Network ke
594     9-Nov-23      MANDIRI IDR       1220011559559   WH Bali                                                     14,369,500   14,500,000        159,500        290,000         14,369,500
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
595     9-Nov-23      MANDIRI IDR       1220011559559   Material dari PT Nobi Putra Angkasa ke WH Bali               6,887,450    6,950,000         76,450        139,000          6,887,450
Page 147
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 33
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
596     9-Nov-23      MANDIRI IDR       1220011559559   Material dari WH Serpong ke WH Bali                          7,135,200    7,200,000         79,200        144,000          7,135,200
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
597     9-Nov-23      MANDIRI IDR       1220011559559   Material dari PT Nobi Putra Angkasa ke WH Bali               6,738,800    6,800,000         74,800        136,000          6,738,800
                                                        FPU PENJAGA SITE , Biaya pembayaran penjaga site
                                                        dan uang canang bulan Oktober 2023 (Trf Bank
598     9-Nov-23      MANDIRI IDR       1220011559559   Sinarmas di 65 Site BTS)                                    38,200,000   38,200,000            -                -         38,200,000
                                                        SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                        Pemakaian Listrik di Graha Samudera Periode Oct
599     9-Nov-23      MANDIRI IDR       1220011559559   2023                                                           257,550     255,000          28,050         25,500            257,550
                                                        HIJAU TEDUH SAKA PERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Sastra Graha Periode 12
600     9-Nov-23      MANDIRI IDR       1220011559559   Sep 2023 - 10 Oct 2023                                         131,436     146,039             -           14,603            131,436
                                                        MEGA PLAZA, PT , Biaya atas Pemakaian Listrik di
601     9-Nov-23      MANDIRI IDR       1220011559559   Gedung Mega Plaza periode Sep 2023                             149,482     148,002          16,280         14,800            149,482
                                                        DONNELLY PARAMITA UTAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Transavia Land/Graha
602     9-Nov-23      MANDIRI IDR       1220011559559   Paramita periode Aug 2023                                      305,498     302,473          33,272         30,247            305,498
                                                        DONNELLY PARAMITA UTAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Transavia Land/Graha
603     9-Nov-23      MANDIRI IDR       1220011559559   Paramita periode Sep 2023                                      326,504     323,271          35,560         32,327            326,504
                                                        ISMAWA TRIMITRA, PT , Biaya atas Pemakaian Listrik
                                                        di Graha Iskandarsyah periode 20 Sep 2023 - 20 Oct
604     9-Nov-23      MANDIRI IDR       1220011559559   2023                                                           162,580     160,969          17,707         16,096            162,580

                                                        MENARA PRAMBANAN, PT , Biaya atas Pemakaian
605     9-Nov-23      MANDIRI IDR       1220011559559   Listrik di Apartement Poins Square periode Oct 2023            210,661     234,067             -           23,406            210,661
                                                        KRAKATAU SARANA PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Krakatau Steel Group periode Aug
606     9-Nov-23      MANDIRI IDR       1220011559559   2023                                                            37,864         37,488        4,124          3,748             37,864
                                                        KRAKATAU SARANA PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Krakatau Steel Group periode Sep
607     9-Nov-23      MANDIRI IDR       1220011559559   2023                                                            37,864         37,488        4,124          3,748             37,864
                                                        SERPONG MAS TELEMATIKA, PT , Biaya Management
                                                        Fee atas Revenue Sharing Residential periode Juni
608     9-Nov-23      MANDIRI IDR       1220011559559   2023 di Kawasan Bumi Serpong Damai                           3,622,594    3,323,480        365,583         66,469          3,622,594
                                                        SERPONG MAS TELEMATIKA, PT , Biaya Management
                                                        Fee atas Revenue Sharing Residential periode Juli
609     9-Nov-23      MANDIRI IDR       1220011559559   2023 di Kawasan Bumi Serpong Damai                           6,428,254    5,897,480        648,723        117,949          6,428,254
                                                        WISMA KEIAI INDONESIA, PT , Tagihan Profit Sharing
                                                        Penempatan Perangkat Telekomunikasi di Gedung
610     9-Nov-23      MANDIRI IDR       1220011559559   Wisma Keiai periode Juli - September 2023                   20,085,534   19,886,667      2,187,533       1,988,666        20,085,534
                                                        AWAN KILAT SEMESTA, PT , Tagihan Revenue Sharing
                                                        periode September 2023 atas penjualan produk
611     9-Nov-23      MANDIRI IDR       1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                   30,605,400   31,230,000            -          624,600         30,605,400
                                                        CENTRA SARANA DATA, PT , Tagihan Revenue Sharing
                                                        Bali Fiber di Gedung UOB Plaza (Chubb Square)
612     9-Nov-23      MANDIRI IDR       1220011559559   periode Juli - September 2023                               11,113,078   10,195,484      1,121,503        203,909         11,113,078
                                                        GRAHA MEGAH SEJAHTERA, PT , Biaya Management
                                                        Fee atas Revenue Sharing periode Juli - September
613     9-Nov-23      MANDIRI IDR       1220011559559   2023 di Gedung Plaza Timor 2                                 1,013,700     930,000         102,300         18,600          1,013,700
                                                        TEKNOVATUS SOLUSI SEJAHTERA, PT , Biaya Sewa
                                                        MMR Switch ISP to Rack Bali Tower Periode 01 - 31
614     9-Nov-23      MANDIRI IDR       1220011559559   Okt 2023                                                       635,834     583,333          64,167         11,666            635,834
Page 148
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 34
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                            NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                     BANK          DPP            PPN             PPh        NET DIBAYARKAN
                                                        TEKNOVATUS SOLUSI SEJAHTERA, PT , Sewa
                                                        Colocation Rack & MMR Connect untuk Tenant PT
                                                        Wirecard Technologies Indonesia periode 01 - 31 Okt
615     9-Nov-23      MANDIRI IDR       1220011559559   2023                                                       6,022,250     5,525,000      607,750        110,500         6,022,250
                                                        BINAMITRA MEGAWARNA, PT , Pembelian Flyer
                                                        Residential Periode September 2023 Stiker A
                                                        Sebanyak 14.500 Lbr, Flyer Residential Periode
616     9-Nov-23      MANDIRI IDR       1220011559559   September 2023 Stiker C Sebanyak 33.500 Lbr               15,123,750    13,875,000    1,526,250        277,500        15,123,750
                                                        BINAMITRA MEGAWARNA, PT , Pembelian Poster
617     9-Nov-23      MANDIRI IDR       1220011559559   Balifiber Instan Wifi Sebanyak 3.000 Lbr                  10,447,650     9,585,000    1,054,350        191,700        10,447,650
                                                        CELLULAR OPERATION SUPPORT , Uang Muka Beban
                                                        Umum atas FPU Biaya Pembelian Top Up Kuota XL
                                                        Mikrotik Monitoring NOC Periode Pemakaian Untuk
618     9-Nov-23      MANDIRI IDR       1220011559559   Desember 2023 - Trf                                          314,500      314,500           -                -           314,500
                                                        CELLULAR OPERATION SUPPORT , Uang Muka Beban
                                                        Umum atas FPU Biaya Geser Kwh Meter Site 709517
619     9-Nov-23      MANDIRI IDR       1220011559559   Paledang-001 - Trf                                           332,801      332,801           -                -           332,801
                                                        PERUM BULOG , Uang Muka Beban Umum atas Biaya
                                                        Uang Jaminan Sewa Lahan 4 Site di Kawasan Bulog
620     9-Nov-23      MANDIRI IDR       1220011559559   (Periode Tahun 2023 - 2025)                                  258,300      258,300           -                -           258,300
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Kabel dari PT Prysmian Cable ke PT Santa
621     9-Nov-23      MANDIRI IDR       1220011559559   Multi Semesta                                                594,600      600,000         6,600         12,000           594,600
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses Crossing Road dari PT CCSI ke PT
622     9-Nov-23      MANDIRI IDR       1220011559559   Dinamikon Inovasi Teknologi                                  743,250      750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
623     9-Nov-23      MANDIRI IDR       1220011559559   Material dari WH Serpong ke WH Penjernihan                   495,500      500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 32 Core dari PT CCSI ke PT
624     9-Nov-23      MANDIRI IDR       1220011559559   Dinamikon Inovasi Teknologi                                  743,250      750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses Crossing Road dari PT CCSI ke PT
625     9-Nov-23      MANDIRI IDR       1220011559559   Dovanega Rekatama Cipta                                      743,250      750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses Crossing Road dari PT CCSI ke PT
626     9-Nov-23      MANDIRI IDR       1220011559559   Skill Globalindo Sukses                                      743,250      750,000         8,250         15,000           743,250
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Kabel dari PT CCSI ke PT Sekawan Persada
627     9-Nov-23      MANDIRI IDR       1220011559559   Gemilang                                                   1,580,500     1,450,000      159,500         29,000         1,580,500
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Kabel ADSS 32 Core dari PT Prysmian Cable
628     9-Nov-23      MANDIRI IDR       1220011559559   ke PT Dinamikon Inovasi Teknologi                          1,308,000     1,200,000      132,000         24,000         1,308,000
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material Backbone MP Veteran dari PT CCSI ke PT
629     9-Nov-23      MANDIRI IDR       1220011559559   Banyu Manunggal Sejahtera                                  3,270,300     3,300,000       36,300         66,000         3,270,300
                                                        DANAMAS INSAN KREASI ANDALAN, PT ,
                                                        Reimbursement Salary Outsource Div. Direct Sales
630     9-Nov-23      MANDIRI IDR       1220011559559   Periode Sept 2023 dan Insentif Periode Agust 2023        172,668,887   171,525,384    1,397,614        254,111       172,668,887

                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
631     9-Nov-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Penjernihan             495,500      500,000         5,500         10,000           495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Panel Box KWH dari PT Nobi Putra Angkasa
632     9-Nov-23      MANDIRI IDR       1220011559559   ke WH Matraman                                               594,600      600,000         6,600         12,000           594,600
Page 149
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 35
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP             PPN             PPh        NET DIBAYARKAN

                                                        ASIA TELCO NETWORKS, PT , Pembelian Adapter
                                                        Bracket Polygon L 110MM W 120MM H 120MM
633     9-Nov-23      MANDIRI IDR       1220011559559   Sebanyak 500 Pcs untuk Kebutuhan Operasional CCTV           199,800,000   180,000,000    19,800,000              -       199,800,000
                                                        ASIA TELCO NETWORKS, PT , Pembelian Cable
                                                        Network UTP Cat-6 No Connector Belden Sebanyak
634     9-Nov-23      MANDIRI IDR       1220011559559   12200 MTR                                                    93,196,044    83,960,400     9,235,644              -        93,196,044
                                                        ASIA TELCO NETWORKS, PT , Pembelian Bracket
                                                        Adapter AP Kebutuhan Ts Dept Ops Sebanyak 50 Pcs,
                                                        Bracket Adapter Kebutuhan Ts Dept. Government Ops
635     9-Nov-23      MANDIRI IDR       1220011559559   50 Pcs                                                        7,758,900     6,990,000       768,900              -         7,758,900
                                                        I WAYAN SELAMET, SH , Biaya penyusunan
                                                        perpanjangan akta perjanjian sewa lahan site 40 BTDC
                                                        Nusa Dua(PO Rp.3.076.923,- Potongan PPh 21(2.5%)
636    10-Nov-23      SINARMAS IDR       0002999994     Rp.76.923,- )                                                 3,000,000     3,076,923           -           76,923         3,000,000
                                                        PEMERINTAH KOTA DENPASAR , Biaya sewa utilitas
                                                        PJU untuk 23 site kota Denpasar selama 1 tahun
637    10-Nov-23      SINARMAS IDR       0002999994     periode 7 Agustus 2023-7 Agustus 2024                       142,370,885   142,370,885           -                -       142,370,885
                                                        DINAS PENDAPATAN DAERAH , Biaya pembayaran
                                                        Pajak Bumi dan Bangunan tower wilayah Badung
638    10-Nov-23      SINARMAS IDR       0002999994     Selatan periode th 2023                                      28,220,603    28,220,603           -                -        28,220,603
                                                        FPU PENJAGA SITE , Biaya pembayaran penjaga site
                                                        dan uang canang bulan Oktober 2023 (NonTrf Bank
639    10-Nov-23      SINARMAS IDR       0002999994     Sinarmas di 3 Site BTS)                                       2,400,000     2,400,000           -                -         2,400,000
                                                        EQUINIX SINGAPORE PTE LTD , Biaya Sewa Rack
                                                        Colocation dan Interkoneksi Equinix Singapore
640    10-Nov-23      SINARMAS IDR       0000240408     periode Okt 2023                                            102,069,138   102,069,138           -                -       102,069,138
                                                        CHINA MOBILE INTERNATIONAL LTD , IP Transit
641    10-Nov-23     SINARMAS USD        0000670707     Equinix SG 20Mbps Periode Okt 2023                            7,375,710     7,375,710           -                -         7,375,710
                                                        CHINA MOBILE INTERNATIONAL LTD , IP Transit
642    10-Nov-23     SINARMAS USD        0000670707     Equinix SG 50Mbps Periode Okt 2023                           10,231,836    10,231,836           -                -        10,231,836
                                                        GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                        Management Fee atas Revenue Sharing periode April -
643    10-Nov-23      MANDIRI IDR       1220011559559   Juni 2023 di Kawasan Apartement Element                      13,891,681    12,744,662     1,401,912        254,893        13,891,681

                                                        JAKARTA INTILAND, PT , Biaya atas Pemakaian Listrik
644    10-Nov-23      MANDIRI IDR       1220011559559   di Ramayana Karawang Periode Oktober 2023                       536,108      530,801         58,387         53,080           536,108

                                                        JAKARTA INTILAND, PT , Biaya atas Pemakaian Listrik
645    10-Nov-23      MANDIRI IDR       1220011559559   di Ramayana Jatinegara Periode Oktober 2023                     358,447      354,898         39,038         35,489           358,447
                                                        SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                        Listrik di Sentral Senayan I Periode 28 Aug 2023 - 27
646    10-Nov-23      MANDIRI IDR       1220011559559   Sep 2023                                                         79,659         78,870        8,676          7,887            79,659
                                                        SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                        Listrik di Plaza Senayan Periode 28 Aug 2023 - 27 Sep
647    10-Nov-23      MANDIRI IDR       1220011559559   2023                                                            531,795      526,530         57,918         52,653           531,795
                                                        SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                        Listrik di Plaza Senayan Arcadia Periode 28 Aug 2023 -
648    10-Nov-23      MANDIRI IDR       1220011559559   27 Sep 2023                                                      84,880         84,040        9,244          8,404            84,880
                                                        ASSET PACIFIC, PT , Biaya atas Pemakaian Listrik di
649    10-Nov-23      MANDIRI IDR       1220011559559   Gedung Menara Salemba periode Sep 2023                          121,338      120,136         13,215         12,013           121,338
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
650    10-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Jati Asih-005                    420,420      431,200            -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
651    10-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Cimpaeun-001                     420,420      431,200            -           10,780           420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
652    10-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Rawa Terate-005                  420,420      431,200            -           10,780           420,420
Page 150
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 36
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                        Pengelasan RRU Tenant IOH Site Cipinang Besar
653    10-Nov-23      MANDIRI IDR       1220011559559   Selatan-012                                                     420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
654    10-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Sukamaju-001                     420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
655    10-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Pondok Kopi-005                  420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
656    10-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Cisalak-001                      420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
657    10-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Jatisampurna-010                 420,420      431,200           -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
                                                        Pengelasan RRU Tenant IOH Site MP-Medan Satria-
658    10-Nov-23      MANDIRI IDR       1220011559559   001                                                             420,420      431,200           -           10,780            420,420

                                                        CELLULAR OPERATION SUPPORT , Uang Muka Beban
                                                        Umum atas 315_FPU Biaya Pembelian Token Urgent 2
                                                        Site 601159 MP-Ciracas-001 & 704209 Rawa Terate-
659    13-Nov-23      MANDIRI IDR       1220011559559   009 (Gagal terproses di proposed phase 10) -Trf               4,014,000     4,014,000          -                -          4,014,000

                                                        CELLULAR OPERATION SUPPORT , Uang Muka Beban
                                                        Umum atas 315_FPU Biaya Pembelian Token Urgent 2
                                                        Site 601160 MP-Cibubur-001 & 705858 Tanjung Barat-
660    13-Nov-23      MANDIRI IDR       1220011559559   014- (Gagal terproses di proposed phase 10) - Trf             4,517,500     4,517,500          -                -          4,517,500

                                                        CELLULAR OPERATION SUPPORT , Uang Muka Beban
                                                        Umum atas 315_FPU Biaya Pembelian Token Urgent 2
                                                        Site 702059 Kembangan Selatan-011 & 799122 Tugu-
661    13-Nov-23      MANDIRI IDR       1220011559559   021-(Gagal terproses di proposed phase 10) - Trf              4,014,000     4,014,000          -                -          4,014,000
                                                        JEJARING ULTRA PRIMA, PT , Biaya Sewa Penempatan
                                                        Perangkat Telekomunikasi di Kawasan Summarecon
                                                        Residential Berdasarkan Profit Sharing April - Juni
662    13-Nov-23      MANDIRI IDR       1220011559559   2023                                                        156,075,849   143,188,852   15,750,774       2,863,777       156,075,849

                                                        JEJARING ULTRA PRIMA, PT , Biaya Sewa Penempatan
                                                        Perangkat Telekomunikasi di Kawasan Summarecon
663    13-Nov-23      MANDIRI IDR       1220011559559   Corporate Berdasarkan Profit Sharing April - Juni 2023      105,760,733    97,028,195   10,673,101       1,940,563       105,760,733
                                                        BALI PECATU GRAHA, PT , Biaya tagihan listrik dan IPL
                                                        BPG Bulan November 2023 (pemakaian bulan Oktober
664    14-Nov-23      SINARMAS IDR       0002999994     2023)                                                        11,928,802    11,928,802          -                -         11,928,802
                                                        AREA BADUNG , Biaya retribusi pengendalian menara
                                                        telekomunikasi untuk site yang beralokasi di Kab.
665    14-Nov-23      SINARMAS IDR       0002999994     Badung tahap 1                                               65,000,000    65,000,000          -                -         65,000,000
                                                        PPPSRS CAMPURAN APARTEMENT THE BOULEVARD ,
                                                        Uang Muka Beban Umum atas Biaya Open Booth
                                                        Balifiber di area Apartemen Boulevard - November
666    14-Nov-23      MANDIRI IDR       1220011559559   2023                                                          1,000,000     1,000,000          -                -          1,000,000
                                                        PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
667    14-Nov-23      MANDIRI IDR       1220011559559   Pluit LG-04 periode Sep 2023                                    472,925      472,925           -                -            472,925
                                                        PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
668    14-Nov-23      MANDIRI IDR       1220011559559   Pluit B/10 periode Oct 2023                                     316,296      316,296           -                -            316,296

                                                        GERAI LISTRIK PASAR MOBIL KEMAYORAN , Biaya
                                                        Tagihan Pascabayar untuk Site Gunung Sahari Utara-
                                                        008, Gunung Sahari Utara-009 dan Danau Sunter DII-
                                                        003 Periode November 2023 (Pemakaian Oktober
669    14-Nov-23      MANDIRI IDR       1220011559559   2023) Gerai Listrik Pasar Mobil Kemayoran                     5,070,060     5,173,530          -          103,470          5,070,060
Page 151
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 37
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                            NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                       BANK            DPP            PPN             PPh         NET DIBAYARKAN

                                                        CLUSTER PERMATA BUANA RW 09 , Uang Muka
                                                        Beban Umum atas Pembayaran Kontribusi ke RW 09
                                                        berupa CSR di Perumahan/Cluster Permata Buana
                                                        RW09 sejumlah Rp 5.000.000/bulan Periode Agustus
670    14-Nov-23      MANDIRI IDR       1220011559559   2023 - November 2023- PO:1010037925 -Trf                  20,000,000     20,000,000           -                -         20,000,000
                                                        PERUM BULOG , Uang Muka Beban Umum atas Biaya
                                                        Sewa Lahan 4 Site Kawasan Bulog Periode Tahun 2023
671    14-Nov-23      MANDIRI IDR       1220011559559   - 2025                                                   176,843,118    176,843,118           -                -        176,843,118
                                                        BALI NUSA DUA INDONESIA, PT , Biaya Sewa
                                                        Backbone Event AMC Asia - Red Hat Event 2024 di
                                                        Gedung BNDCC ITDC Nusa Dua Bali (PO
                                                        Rp.16.650.000,- Potongan PPh 23(2%) Rp.300.000,-
672    14-Nov-23      SINARMAS IDR       0002999994     dari jasa Rp.15.000.000,- )                               16,350,000     15,000,000     1,650,000        300,000         16,350,000
                                                        PEMERINTAH KOTA SURAKARTA , Uang Muka Beban
                                                        Umum atas Biaya Sewa Lahan FO 17 Ruas Jalan
                                                        Wilayah Kota Surakarta Periode 20 Desember 2022
                                                        s/d 20 Desember 2023 (BATCH II) - PR : 1010035507 -
673    15-Nov-23      MANDIRI IDR       1220011559559   Trf                                                       62,424,000     62,424,000           -                -         62,424,000
                                                        PEMERINTAH KOTA SURAKARTA , Uang Muka Beban
                                                        Umum atas Biaya Sewa Lahan FO 24 Ruas Jalan
                                                        Wilayah Kota Surakarta Periode 28 Desember 2022
674    15-Nov-23      MANDIRI IDR       1220011559559   s/d 28 Desember 2023 -Trf                                 78,828,000     78,828,000           -                -         78,828,000
                                                        FANAH JAYA MAINDO, PT , Pembelian Cable Power
                                                        NYM 3x2.5MM Sebanyak 100 Mtr, MCB AC 1 Phase
675    15-Nov-23      MANDIRI IDR       1220011559559   10A Sebanyak 1 Pcs                                         1,615,050      1,455,000       160,050              -          1,615,050
                                                        PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
676    15-Nov-23      MANDIRI IDR       1220011559559   Phase 11 Jawa Barat Periode November 2023                 55,064,500     55,064,500           -                -         55,064,500
                                                        JAKARTA UTILITAS PROPERTINDO, PT , Tagihan
                                                        Revenue Sharing atas Sewa Penempatan Perangkat
677    15-Nov-23      MANDIRI IDR       1220011559559   periode 08 Agust 2023 - 07 Agust 2024                    363,600,000    360,000,000    39,600,000      36,000,000       363,600,000

                                                        PLN PERSERO, PT , Biaya Tagihan Listrik PLN
678    16-Nov-23      MANDIRI IDR       1220011559559   Pascabayar BTS Region Bali Periode November 2023       1,325,227,630   1,325,227,630          -                -       1,325,227,630
                                                        SMART TELECOM, PT , Internet Banndwith 1 site
679    16-Nov-23      MANDIRI IDR       1220011559559   @50mbps (I : 1000060366)                                     666,000        600,000        66,000              -            666,000
                                                        SMART TELECOM, PT , Internet Banndwith 3 site
680    16-Nov-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001179)                                  23,027,065     20,745,104     2,281,961              -         23,027,065
                                                        SMART TELECOM, PT , Internet Banndwith 17 site
681    16-Nov-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001190)                                 153,145,088    137,968,548    15,176,540              -        153,145,088
                                                        SMART TELECOM, PT , Internet Banndwith 63 site
682    16-Nov-23      MANDIRI IDR       1220011559559   @50mbps (I : 8000001180)                                 570,630,875    514,081,870    56,549,005              -        570,630,875
                                                        SINAR SURYA KOMINDO, PT , Uang Muka Beban
                                                        Umum atas 315 - Biaya Perbaikan Splicer Tumtec FST
683    16-Nov-23      MANDIRI IDR       1220011559559   16S S/N :                                                  2,180,000      2,180,000           -                -          2,180,000
                                                        PLN PERSERO, PT , Biaya PLN Auto Debet Region Jawa
684    16-Nov-23      MANDIRI IDR       1220011559559   Barat Periode November 2023                               69,699,582     69,699,582           -                -         69,699,582
                                                        PLN PERSERO, PT , Biaya Tagihan KWH PLN
                                                        Pascabayar Region Jawa Tengah Periode November
685    16-Nov-23      MANDIRI IDR       1220011559559   2023                                                     149,521,126    149,521,126           -                -        149,521,126
                                                        PLN PERSERO, PT , Biaya PLN Autodebet Jawa Timur
686    16-Nov-23      MANDIRI IDR       1220011559559   Periode November 2023                                    190,657,104    190,657,104           -                -        190,657,104
                                                        PLN PERSERO, PT , Biaya Tagihan KWH PLN Pasca
687    16-Nov-23      MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode November 2023         2,445,341,266   2,445,341,266          -                -       2,445,341,266

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
688    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021765112017         9,859,114      9,859,114           -                -          9,859,114
Page 152
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                            Page 38
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                           NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                      BANK          DPP           PPN             PPh        NET DIBAYARKAN

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
689    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021776112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
690    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021764112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
691    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021763112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
692    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021768112017        9,898,506    9,898,506          -                -         9,898,506

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
693    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021781112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
694    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021774112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
695    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021780112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
696    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021783112017        7,463,098    7,463,098          -                -         7,463,098

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
697    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021785112017        7,463,098    7,463,098          -                -         7,463,098

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
698    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021786112017        7,463,098    7,463,098          -                -         7,463,098

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
699    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021767112017        9,898,506    9,898,506          -                -         9,898,506

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
700    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021766112017        9,898,506    9,898,506          -                -         9,898,506

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
701    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021762112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
702    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021769112017        9,898,506    9,898,506          -                -         9,898,506

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
703    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021775112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
704    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021779112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
705    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021778112017        9,859,114    9,859,114          -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 27 Nov
706    17-Nov-23      MANDIRI IDR       1220011559559   2023 s.d 26 Nov 2024 - No. Aplikasi : 021777112017        9,859,114    9,859,114          -                -         9,859,114
                                                        RAJAWALI ADIWISMA, PT , Biaya atas Pemakaian
707    17-Nov-23      MANDIRI IDR       1220011559559   Listrik di Menara Rajawali Periode Oct 2023                 177,088     175,335        19,286         17,533           177,088
Page 153
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 39
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK          DPP             PPN             PPh          NET DIBAYARKAN
                                                        PRM PEMBANGUNAN PERUMAHAN NASIONAL , Sewa
                                                        Penempatan Perangkat di Gedung Rusunawa
                                                        Cengkareng Tower Dahlia periode 31 Mar 2023 - 30
708    17-Nov-23      MANDIRI IDR       1220011559559   Nov 2023                                                    4,040,000    4,000,000        440,000        400,000           4,040,000

                                                        PERHIMPUNAN PENGHUNI MENARA KADIN
                                                        INDONESIA , Sewa Penempatan Perangkat di Gedung
709    17-Nov-23      MANDIRI IDR       1220011559559   Menara Kadin periode 01 Agust 2023 - 30 Sept 2023           7,500,000    8,333,333            -          833,333           7,500,000

                                                        ASIA TEKNOLOGI SOLUSI, PT , Sewa Local Loop 50
                                                        Mbps untuk Kebutuhan PT Seven Morning site PIK to
710    17-Nov-23      MANDIRI IDR       1220011559559   Cyber 1 Metro - E Local Loop periode Oktober 2023           3,059,085    2,806,500        308,715         56,130           3,059,085

                                                        INTILAND DEVELOPMENT TBK, PT (SURABAYA) , Sewa
                                                        Penempatan Perangkat dan Penarikan Kabel 24 Core
711    17-Nov-23      MANDIRI IDR       1220011559559   di Gedung Intiland periode 23 Jan 2023 - 31 Des 2023        2,613,239    2,587,365        284,610        258,736           2,613,239
                                                        TEKNOVATUS SOLUSI SEJAHTERA, PT , Tagihan Sewa
                                                        Collocation Rack 47 U 19" periode Okt 2023 dan
712    17-Nov-23      MANDIRI IDR       1220011559559   Kelebihan Pemakaian Listrik periode Sept 2023              24,801,751   22,753,900      2,502,929        455,078          24,801,751
                                                        SERPONG MAS TELEMATIKA, PT , Kurang bayar atas
                                                        Biaya Management Fee atas Revenue Sharing
                                                        Residential periode April 2023 di Kawasan Bumi
713    17-Nov-23      MANDIRI IDR       1220011559559   Serpong Damai                                                  99,000         99,000          -                -              99,000
                                                        INTILAND DEVELOPMENT TBK, PT (JAKARTA) , Biaya
                                                        atas Pemakaian Listrik di Gedung Intiland Jakarta
714    17-Nov-23      MANDIRI IDR       1220011559559   periode 26 Aug 2023 - 25 Sep 2023                             604,017     598,036          65,784         59,803             604,017

                                                        PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                        KIRANA TWO , Biaya atas Pemakaian Listrik di Gedung
715    17-Nov-23      MANDIRI IDR       1220011559559   Kirana Two periode 21 Sep 2023 - 20 Oct 2023                  713,437     792,707             -           79,270             713,437
                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH RUSUN SPAZIO , Biaya Admin atas Pemakaian
                                                        Listrik di Rusun Spazio periode 21 Sep 2023 - 20 Oct
716    17-Nov-23      MANDIRI IDR       1220011559559   2023                                                           13,085         13,352          -                267            13,085

                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH RUSUN SPAZIO , Biaya atas Pemakaian Listrik
717    17-Nov-23      MANDIRI IDR       1220011559559   di Rusun Spazio periode 21 Sep 2023 - 20 Oct 2023             133,518     133,518             -                -             133,518
                                                        GRAHANIAGA TATAUTAMA, PT , Biaya atas
                                                        pemakaian Listrik di Gedung Graha Niaga Tatautama
718    17-Nov-23      MANDIRI IDR       1220011559559   Periode 21/09/2023 - 20/10/2023                               232,658     230,354          25,339         23,035             232,658
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel
719    17-Nov-23      MANDIRI IDR       1220011559559   BZ3 periode 13 Sep 2023 - 12 Oct 2023                         530,459     525,206          57,773         52,520             530,459
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel
720    17-Nov-23      MANDIRI IDR       1220011559559   BZ2 periode 13 Sep 2023 - 12 Oct 2023                         463,352     458,764          50,464         45,876             463,352
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel 1 Zona 1 13 Sep 2023 - 12 Oct
721    17-Nov-23      MANDIRI IDR       1220011559559   2023                                                          131,431     130,130          14,314         13,013             131,431
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel BZ2 periode 13 Sep 2023 - 12 Oct
722    17-Nov-23      MANDIRI IDR       1220011559559   2023                                                          159,782     158,200          17,402         15,820             159,782
Page 154
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 40
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh        NET DIBAYARKAN

                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
723    17-Nov-23      MANDIRI IDR       1220011559559   Bekasi Parkir DTW periode 13 Sep 2023 - 12 Oct 2023            106,265     105,213        11,573         10,521           106,265
                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Parkir DTW
724    17-Nov-23      MANDIRI IDR       1220011559559   periode 13 Sep 2023 - 12 Oct 2023                              160,992     159,397        17,534         15,939           160,992
                                                        MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                        Pemakaian Listrik di Gedung Sentra Summarecon
                                                        Bekasi Ruang Panel BZ3 periode 13 Sep 2023 - 12 Oct
725    17-Nov-23      MANDIRI IDR       1220011559559   2023                                                           171,660     169,960        18,696         16,996           171,660

                                                        MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                        di Gedung Sentra Summarecon Bekasi Ruang Panel 1
726    17-Nov-23      MANDIRI IDR       1220011559559   Zona 1 periode 13 Sep 2023 - 12 Oct 2023                       303,176     300,174        33,019         30,017           303,176

                                                        MULIA INTIPELANGI, PT , Biaya atas Pemakaian Listrik
727    17-Nov-23      MANDIRI IDR       1220011559559   Mall Taman Anggrek (GL-L5) Periode Sep 2023                  3,859,416    3,821,204      420,332        382,120         3,859,416

                                                        MULIA INTIPELANGI, PT , Biaya atas Pemakaian Listrik
728    17-Nov-23      MANDIRI IDR       1220011559559   Mall Taman Anggrek (GL-L5) Periode Oct 2023                  3,800,499    3,762,870      413,916        376,287         3,800,499

                                                        MULIA INTIPELANGI, PT , Biaya atas Pemakaian Listrik
729    17-Nov-23      MANDIRI IDR       1220011559559   Mall Taman Anggrek (GL-L5) Periode Aug 2023                  3,845,132    3,807,061      418,777        380,706         3,845,132
                                                        PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                        PERKANTORAN GRAHA SURVEYOR INDONESIA , Biaya
                                                        atas Pemakaian Listrik di Gedung Surveyor Lt.11
730    17-Nov-23      MANDIRI IDR       1220011559559   periode 22 Sep 2023 - 22 Oct 2023                              342,927     381,029           -           38,102           342,927
                                                        PERHIMPUNAN PENGHUNI KONDOMINIUM
                                                        PERKANTORAN GRAHA SURVEYOR INDONESIA , Biaya
                                                        atas Pemakaian Listrik di Gedung Surveyor Lt.P2
731    17-Nov-23      MANDIRI IDR       1220011559559   periode 22 Sep 2023 - 22 Oct 2023                              326,930     363,255           -           36,325           326,930
                                                        BUMI MULIA PERKASA DEVELOPMENT, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Atrium Mulia periode Oct
732    17-Nov-23      MANDIRI IDR       1220011559559   2023                                                           232,423     230,122        25,313         23,012           232,423
                                                        PENGELOLA PUSAT BELANJA, PT , Biaya atas
                                                        Pemakaian Listrik di Mall Bassura periode 16 Sep 2023
733    17-Nov-23      MANDIRI IDR       1220011559559   - 15 Oct 2023                                                  840,602     832,278        91,551         83,227           840,602
                                                        SUGIH BERKAT, PT , Biaya atas Pemakaian Listrik di
                                                        Gedung Menara Citicon periode 27 Sep 2023 - 27 Oct
734    17-Nov-23      MANDIRI IDR       1220011559559   2023                                                           707,000     700,000        77,000         70,000           707,000
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-A) periode 16
735    17-Nov-23      MANDIRI IDR       1220011559559   Sep 2023 - 15 Oct 2023                                         151,446     149,946        16,494         14,994           151,446
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-B) periode 16
736    17-Nov-23      MANDIRI IDR       1220011559559   Sep 2023 - 15 Oct 2023                                         136,029     134,682        14,815         13,468           136,029
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-D) periode 16
737    17-Nov-23      MANDIRI IDR       1220011559559   Sep 2023 - 15 Oct 2023                                         123,512     122,290        13,451         12,229           123,512
                                                        PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                        Pemakaian Listrik Landmark Pluit (GF-E) periode 16
738    17-Nov-23      MANDIRI IDR       1220011559559   Sep 2023 - 15 Oct 2023                                         160,299     158,712        17,458         15,871           160,299
                                                        GRIYA MURIA KENCANA, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Prince Center periode 26 Sep 2023 -
739    17-Nov-23      MANDIRI IDR       1220011559559   25 Oct 2023                                                    227,378     225,126        24,764         22,512           227,378
Page 155
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 41
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                      BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        NICO CENTRAL, PT , Biaya atas Pemakaian Listrik di
740    17-Nov-23      MANDIRI IDR       1220011559559   Gedung Sona Topas Tower Periode Oct 2023                       383,749     379,950          41,794         37,995            383,749
                                                        TERAS NIRWANA BALI, PT , Biaya atas Pemakaian
                                                        Listrik di The CEO Building Periode 20 Sep 2023 - 19
741    17-Nov-23      MANDIRI IDR       1220011559559   Oct 2023                                                       173,619     171,900          18,909         17,190            173,619
                                                        KHARISMA INTAN PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Scientia Business Park periode
742    17-Nov-23      MANDIRI IDR       1220011559559   Oct 2023                                                       181,222     179,427          19,737         17,942            181,222
                                                        SERPONG CIPTA KREASI, PT , Biaya atas Pemakaian
                                                        Listrik di Plaza Summarecon Serpong periode Oct
743    17-Nov-23      MANDIRI IDR       1220011559559   2023                                                           962,471     952,941         104,824         95,294            962,471
                                                        MULIA CEMERLANG DIAN PERSADA, PT , Biaya atas
744    17-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Wisma GKBI periode Oct 2023               556,157     550,650          60,572         55,065            556,157
                                                        P3SRS SEMENTARA MEGA GLODOK KEMAYORAN ,
                                                        Biaya atas Pemakaian Listrik di MGK Kemayoran
745    17-Nov-23      MANDIRI IDR       1220011559559   periode 20 Sep 2023 - 20 Oct 2023                              138,776     138,776             -                -            138,776
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
746    17-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Mustika Sari-001                420,420     431,200             -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
747    17-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Pejuang-004                     420,420     431,200             -           10,780            420,420
                                                        APRI YAJI , Tagihan 100% atas Biaya Pekerjaan
748    17-Nov-23      MANDIRI IDR       1220011559559   Pengelasan RRU Tenant IOH Site Mustika Jaya-004                420,420     431,200             -           10,780            420,420
                                                        PERKUMPULAN PEMILIK PERKANTORAN GRAHA
                                                        SURVEYOR INDONESIA (PPPGSI) , Sewa Penempatan
                                                        Perangkat di Gedung Graha Surveyor periode 01 Mei
749    17-Nov-23      MANDIRI IDR       1220011559559   2020 - 30 Apr 2021                                          30,300,000   30,000,000      3,300,000       3,000,000        30,300,000
                                                        PERKUMPULAN PEMILIK PERKANTORAN GRAHA
                                                        SURVEYOR INDONESIA (PPPGSI) , Sewa Penempatan
                                                        Perangkat di Gedung Graha Surveyor periode 01 Mei
750    17-Nov-23      MANDIRI IDR       1220011559559   2021 - 30 Apr 2022                                          30,300,000   30,000,000      3,300,000       3,000,000        30,300,000
                                                        PERKUMPULAN PEMILIK PERKANTORAN GRAHA
                                                        SURVEYOR INDONESIA (PPPGSI) , Sewa Penempatan
                                                        Perangkat di Gedung Graha Surveyor periode 01 Mei
751    17-Nov-23      MANDIRI IDR       1220011559559   2019 - 30 Apr 2020                                          30,300,000   30,000,000      3,300,000       3,000,000        30,300,000
                                                        PERKUMPULAN PEMILIK PERKANTORAN GRAHA
                                                        SURVEYOR INDONESIA (PPPGSI) , Sewa Penempatan
                                                        Perangkat di Gedung Graha Surveyor periode 01 Mei
752    17-Nov-23      MANDIRI IDR       1220011559559   2022 - 30 Apr 2023                                          30,300,000   30,000,000      3,300,000       3,000,000        30,300,000
                                                        NTT INDONESIA, PT , Sewa Crossconnect Establish
                                                        NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
753    17-Nov-23      MANDIRI IDR       1220011559559   Okt 2023                                                    14,715,000   13,500,000      1,485,000        270,000         14,715,000
                                                        AUFA JAYA INDONESIA, PT , Sewa Mesin Fotokopi
                                                        periode 20/09/2023 - 19/10/2023 - Call Center Kantor
754    17-Nov-23      MANDIRI IDR       1220011559559   Cipulir                                                        741,200     680,000          74,800         13,600            741,200
                                                        PPPSRS PERKANTORAN EKSEKUTIF SATRIO TOWER ,
                                                        Biaya atas Pemakaian Listrik di Gedung Satrio Tower
755    17-Nov-23      MANDIRI IDR       1220011559559   periode Oct 2023                                               220,040     217,862          23,964         21,786            220,040
                                                        LESTARI MAHADIBYA, PT , Biaya atas Pemakaian
                                                        Listrik di Scientia Square Park (SQP) Serpong periode
756    17-Nov-23      MANDIRI IDR       1220011559559   11 Sep 2023 - 10 Oct 2023                                      131,928     130,622          14,368         13,062            131,928
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Scientia Square Park (SQP)
757    17-Nov-23      MANDIRI IDR       1220011559559   Serpong periode 11 Sep 2023 - 10 Oct 2023                       54,384         53,845        5,923          5,384             54,384
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Summarecon Digital Centre (SDC)
758    17-Nov-23      MANDIRI IDR       1220011559559   Serpong periode 11 Sep 2023 - 10 Oct 2023                       82,920         82,098        9,031          8,209             82,920
Page 156
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 42
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                        Summarecon Digital Centre (SDC) Serpong periode 11
759    17-Nov-23      MANDIRI IDR       1220011559559   Sep 2023 - 10 Oct 2023                                         293,678      290,770         31,985         29,077            293,678
                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
760    17-Nov-23      MANDIRI IDR       1220011559559   Diskominfo Cirebon 500Mbps periode Okt 2023                  8,720,000     8,000,000       880,000        160,000          8,720,000
                                                        MEGA AKSES PERSADA, PT , Sewa Jabalink Purwakarta
761    17-Nov-23      MANDIRI IDR       1220011559559   (Fiberstar) 100Mbps periode Okt 2023                         6,540,000     6,000,000       660,000        120,000          6,540,000
                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
                                                        3Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
762    17-Nov-23      MANDIRI IDR       1220011559559   Surabaya Omadata Center periode Okt 2023                    32,700,000    30,000,000     3,300,000        600,000         32,700,000
                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
763    17-Nov-23      MANDIRI IDR       1220011559559   Jakarta - Bandung 500Mbps periode Okt 2023                   9,265,000     8,500,000       935,000        170,000          9,265,000
                                                        MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
764    17-Nov-23      MANDIRI IDR       1220011559559   Jakarta - Bali 5 Gbps periode Okt 2023                      81,750,000    75,000,000     8,250,000       1,500,000        81,750,000
                                                        MEGA AKSES PERSADA, PT , Sewa Jabalink IPLC
                                                        Jakarta - Singapore (Fiberstar) 30 Gbps Periode Okt
765    20-Nov-23      MANDIRI IDR       1220011559559   2023                                                       332,450,000   305,000,000    33,550,000       6,100,000       332,450,000
                                                        XL AXIATA TBK, PT , Biaya Pembelian Paket Data
                                                        Mikrotik site Tawangsari-008 Tenant Smartfren
766    20-Nov-23      MANDIRI IDR       1220011559559   Periode Oktober 2023 Region Jawa Tengah                         60,000         60,000          -                -             60,000
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Summarecon Mal Serpong 1
767    21-Nov-23      MANDIRI IDR       1220011559559   periode 11 Sep 2023 - 10 Oct 2023                              288,113      285,260         31,379         28,526            288,113
                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site 211242 Sibang Kaja-004
768    21-Nov-23      SINARMAS IDR       0002999994     (PO Rp.717.949,- Potongan PPh 17.949,- )                       700,000      717,949            -           17,949            700,000
                                                        INDOSAT TBK, PT , Biaya Sewa Domestic Ethernet Link
                                                        (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6 Jakarta
769    21-Nov-23      MANDIRI IDR       1220011559559   periode Okt 2023                                           114,460,000   105,010,000    11,550,000       2,100,000       114,460,000
                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                        dari MP Pegangsaan Dua ke NDC Jatinegara periode
770    21-Nov-23      MANDIRI IDR       1220011559559   13.04.2023 - 12.05.2023                                      4,578,000     4,200,000       462,000         84,000          4,578,000
                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                        dari MP Pegangsaan Dua ke NDC Jatinegara periode
771    21-Nov-23      MANDIRI IDR       1220011559559   13.06.2023 - 12.07.2023                                      4,578,000     4,200,000       462,000         84,000          4,578,000
                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                        dari MP Pegangsaan Dua ke NDC Jatinegara periode
772    21-Nov-23      MANDIRI IDR       1220011559559   13.03.2023 - 12.04.2023                                      4,578,000     4,200,000       462,000         84,000          4,578,000
                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                        dari MP Pegangsaan Dua ke NDC Jatinegara periode
773    21-Nov-23      MANDIRI IDR       1220011559559   13.01.2023 - 12.02.2023                                      4,578,000     4,200,000       462,000         84,000          4,578,000
                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                        dari MP Pegangsaan Dua ke NDC Jatinegara periode
774    21-Nov-23      MANDIRI IDR       1220011559559   13.02.2023 - 12.03.2023                                      4,578,000     4,200,000       462,000         84,000          4,578,000
                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                        dari MP Pegangsaan Dua ke NDC Jatinegara periode
775    21-Nov-23      MANDIRI IDR       1220011559559   13.12.2022 - 12.01.2023                                      4,578,000     4,200,000       462,000         84,000          4,578,000
                                                        MORA TELEMATIKA INDONESIA, PT , Biaya
                                                        Interkoneksi dari OTB BTS ke Rack BTS NDC Jatinegara
776    21-Nov-23      MANDIRI IDR       1220011559559   periode 01.10.2023 - 31.10.2023                              1,090,000     1,000,000       110,000         20,000          1,090,000
                                                        MORA TELEMATIKA INDONESIA, PT , Biaya
                                                        Interkoneksi dari OTB BTS ke Rack BTS NDC Jatinegara
777    21-Nov-23      MANDIRI IDR       1220011559559   periode 01.09.2023 - 30.09.2023                              1,090,000     1,000,000       110,000         20,000          1,090,000
                                                        TELKOM INDONESIA, PT , Biaya Paket Broadband
                                                        Indihome for Monitoring (CSR) CCTV, FO not ready
778    21-Nov-23      MANDIRI IDR       1220011559559   Area Yogyakarta periode Nov 2023                             1,265,400     1,140,000       125,400              -          1,265,400
Page 157
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 43
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Paket Data
                                                        Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                        Alarm Area Jawa Tengah periode Nov 2023 sebanyak
779    21-Nov-23      MANDIRI IDR       1220011559559   10 MSISDN                                                   1,054,500      950,000       104,500              -          1,054,500
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Paket Data
                                                        Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                        Alarm Area Jawa Tengah periode Nov 2023 sebanyak
780    21-Nov-23      MANDIRI IDR       1220011559559   7 MSISDN                                                      666,000      600,000        66,000              -            666,000
                                                        MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                        Pemakaian Listrik Gedung Palma Tower lt. B.1 periode
781    21-Nov-23      MANDIRI IDR       1220011559559   Oct 2023                                                      103,048      102,027        11,223         10,202            103,048
                                                        MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                        Pemakaian Listrik Gedung Palma Tower lt. 11 periode
782    21-Nov-23      MANDIRI IDR       1220011559559   Oct 2023                                                      103,048      102,027        11,223         10,202            103,048
                                                        JELAJAH DATA SEMESTA, PT , Dedicated Internet
783    21-Nov-23      MANDIRI IDR       1220011559559   Bandwidth 20 Gbps periode Nov 2023                        600,000,000   550,458,716   60,550,459      11,009,174       600,000,000
                                                        PLN PERSERO, PT , Biaya Tagihan KWH PLN Pasca
784    21-Nov-23      MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode November 2023             13,307,686    13,307,686          -                -         13,307,686
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Summarecon Mal Serpong 2
785    22-Nov-23      MANDIRI IDR       1220011559559   periode 11 Aug 2023 - 10 Sep 2023                             332,597      329,304        36,223         32,930            332,597
                                                        LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                        Pemakaian Listrik di Summarecon Mal Serpong 2
786    22-Nov-23      MANDIRI IDR       1220011559559   periode 11 Sep 2023 - 10 Oct 2023                             327,558      324,314        35,675         32,431            327,558
                                                        PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                        Penggantian Biaya Listrik Bulan September 2023 site
787    22-Nov-23      MANDIRI IDR       1220011559559   BTDC                                                        8,363,287     8,363,287          -                -          8,363,287
                                                        BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
788    22-Nov-23      MANDIRI IDR       1220011559559   Material MP26M dari PT DHJ ke Vendor MCP Bali              14,022,650    14,150,000      155,650        283,000         14,022,650
                                                        BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
                                                        Material MP26M dari PT DHJ ke PT Kesa Utama
789    22-Nov-23      MANDIRI IDR       1220011559559   Sejahtera                                                  14,022,650    14,150,000      155,650        283,000         14,022,650
                                                        BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
790    22-Nov-23      MANDIRI IDR       1220011559559   Material MP21M dan 26M dari PT DHJ ke WH Bali              14,914,550    15,050,000      165,550        301,000         14,914,550
                                                        BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
791    22-Nov-23      MANDIRI IDR       1220011559559   Material MP30M dari PT DHJ ke Ade Suryana (Bali)           14,022,650    14,150,000      155,650        283,000         14,022,650
                                                        DIAN MUSTIKA AGUNG, PT , Pembelian Silikon
                                                        Sealent 300ml White 5 Pcs, Baterai A3 Energizer 15
                                                        Pcs, Battery A3 30 Pcs, Safety Barricade Line Black
                                                        Yellow 3 Inch x 500m 10 Pcs untuk Spare Tower
792    22-Nov-23      MANDIRI IDR       1220011559559   Operation                                                   2,250,525     2,027,500      223,025              -          2,250,525
                                                        LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                        Summarecon Mal Serpong 2 periode 11 Sep 2023 - 10
793    22-Nov-23      MANDIRI IDR       1220011559559   Oct 2023                                                      975,024      965,370       106,191         96,537            975,024
                                                        LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                        Summarecon Mal Serpong 2 periode 11 Aug 2023 -
794    22-Nov-23      MANDIRI IDR       1220011559559   10 Sep 2023                                                 1,003,596      993,659       109,302         99,365          1,003,596
                                                        INDOKARYA SUKSES BERSAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Apartemen Pluit Sea View
795    22-Nov-23      MANDIRI IDR       1220011559559   Periode 25 Sep 2023 - 25 Oct 2023                             700,354      778,171           -           77,817            700,354

                                                        TRI PURA INDAH PERSADA, PT , Biaya atas Pemakaian
796    22-Nov-23      MANDIRI IDR       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Oct 2023               307,410      304,366        33,480         30,436            307,410
                                                        PERHIMPUNAN PENGHUNI GRAHA IRAMA , Biaya atas
                                                        Pemakaian Listrik di Gedung Graha Irama periode 01
797    22-Nov-23      MANDIRI IDR       1220011559559   Oct 2023 - 01 Nov 2023                                        130,185      144,649           -           14,464            130,185
Page 158
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 44
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                       BANK          DPP             PPN             PPh        NET DIBAYARKAN
                                                        DWIBINA PRIMA, PT , Biaya atas Pemakaian Listrik di
798    22-Nov-23      MANDIRI IDR       1220011559559   Wisma BSG periode Oct 2023                                       86,329         85,474        9,402          8,547            86,329
                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
799    22-Nov-23      MANDIRI IDR       1220011559559   Listrik di The Kensington periode Oct 2023                      131,487     130,185          14,320         13,018           131,487

                                                        PETARUNG TANGGUH PERSADA, PT , Biaya atas
800    22-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Mal Bali Galeria periode Oct 2023          531,779     526,514          57,916         52,651           531,779

                                                        LIZA CHRISTINA GARMENT INDUSTRY, PT , Biaya atas
801    22-Nov-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Unity Building periode Oct 2023            505,000     500,000          55,000         50,000           505,000
                                                        INTILAND DEVELOPMENT TBK, PT (SURABAYA) , Biaya
                                                        atas Pemakaian Listrik di Gedung Intiland Surabaya
802    22-Nov-23      MANDIRI IDR       1220011559559   periode Oct 2023                                                837,603     829,309          91,224         82,930           837,603
                                                        MEKAR PRANA INDAH, PT , Biaya atas Pemakaian
803    22-Nov-23      MANDIRI IDR       1220011559559   Listrik di Menara Bidakara 2 periode Oct 2023                   259,682     257,111          28,282         25,711           259,682
                                                        PURIAMPERA INTIPRATAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Ad Premier Periode Oct
804    22-Nov-23      MANDIRI IDR       1220011559559   2023                                                            268,134     265,479          29,202         26,547           268,134
                                                        PURIAMPERA INTIPRATAMA, PT , Biaya Sewa
                                                        Penempatan Perangkat Telekomunikasi di Gedung Ad
                                                        Premier Berdasarkan Profit Sharing periode Juli -
805    22-Nov-23      MANDIRI IDR       1220011559559   September 2023                                                5,782,901    5,725,645        629,820        572,564         5,782,901
                                                        PENGELOLA MASPION PLAZA GUNUNG SAHARI , Biaya
                                                        atas Pemakaian Listrik di Gedung Maspion Plaza Lt. 5A
806    22-Nov-23      MANDIRI IDR       1220011559559   periode Oct 2023                                                184,935     205,483             -           20,548           184,935
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
807    22-Nov-23      MANDIRI IDR       1220011559559   General 2 Lt.GF periode Oct 2023                                453,602     416,148          45,776          8,322           453,602
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
808    22-Nov-23      MANDIRI IDR       1220011559559   General 3 Lt.1 periode Oct 2023                                 394,806     362,208          39,842          7,244           394,806
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
809    22-Nov-23      MANDIRI IDR       1220011559559   General 1 BSM periode Oct 2023                                   97,917         89,832        9,881          1,796            97,917
                                                        CITRA KIRANA HIJAU RETAIL, PT , Tagihan
                                                        Management Fee atas Profit Sharing periode Juli -
810    22-Nov-23      MANDIRI IDR       1220011559559   September 2023 di Gedung Green Sedayu Mall                   13,585,672   12,463,919      1,371,031        249,278        13,585,672

                                                        RAJAWALI ADIWISMA, PT , Tagihan Revenue Sharing
                                                        periode Juli - September 2023 atas Sewa Penempatan
811    22-Nov-23      MANDIRI IDR       1220011559559   Perangkat Telekomunikasi di Gedung Menara Rajawali              499,950     495,000          54,450         49,500           499,950
                                                        HARMAS JALESVEVA, PT , Tagihan Revenue Sharing
                                                        Bali Fiber di Mall One Belpark periode Juli -
812    22-Nov-23      MANDIRI IDR       1220011559559   September 2023                                                3,969,300    3,930,000        432,300        393,000         3,969,300
                                                        SUKA DUKA GIRI HILL , Biaya Management Fee atas
                                                        Revenue Sharing periode September 2023 di Suka
813    22-Nov-23      MANDIRI IDR       1220011559559   Duka Raya Hill - Perumahan Giri Hill                          2,271,096    2,365,724            -           94,628         2,271,096
                                                        INFRA YES SOLUSINDO, PT , Biaya Management Fee
                                                        atas Revenue Sharing periode September 2023 di
814    22-Nov-23      MANDIRI IDR       1220011559559   Apartement Green Pramuka                                     34,188,029   34,885,743            -          697,714        34,188,029
                                                        INTI ALGORITMA PERDANA, PT , Tagihan
                                                        Management Fee atas Revenue Sharing periode Juli -
815    22-Nov-23      MANDIRI IDR       1220011559559   September 2023 di Apartement 1Park Avenue                       652,365     598,500          65,835         11,970           652,365
                                                        INTI ALGORITMA PERDANA, PT , Tagihan
                                                        Management Fee atas Revenue Sharing periode Juli -
816    22-Nov-23      MANDIRI IDR       1220011559559   September 2023 di Apartement Praxis                             505,215     463,500          50,985          9,270           505,215
Page 159
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 45
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                        INTI ALGORITMA PERDANA, PT , Tagihan
                                                        Management Fee atas Profit Sharing periode Juli -
817    22-Nov-23      MANDIRI IDR       1220011559559   September 2023 di Apartement Pantai Mutiara                    908,243     833,250        91,658         16,665            908,243
                                                        INTI ALGORITMA PERDANA, PT , Tagihan
                                                        Management Fee atas Profit Sharing periode Juli -
818    22-Nov-23      MANDIRI IDR       1220011559559   September 2023 di Gedung South Quarter                      55,831,564   51,221,618    5,634,378       1,024,432        55,831,564
                                                        CORE MEDIATECH, PT , Biaya Instalasi dan Sewa Local
                                                        Loop 100Mbps PT Core Mediatech untuk Kebutuhan
                                                        Tenant PT Karya Central Bisnis periode 11 - 31 Okt
819    22-Nov-23      MANDIRI IDR       1220011559559   2023                                                        10,618,709    9,741,935    1,071,612        194,838         10,618,709
                                                        DATAMEDIA MAKMUR PRATAMA, PT , Biaya Layanan
                                                        Content TV 42 Channel untuk Tenant RS Atma Jaya
820    22-Nov-23      MANDIRI IDR       1220011559559   Pluit periode Nov 2023                                      12,740,000   13,000,000          -          260,000         12,740,000

                                                        PPPSRS CAMPURAN APARTEMENT THE BOULEVARD ,
                                                        Sewa Penempatan Perangkat di Gedung The
821    22-Nov-23      MANDIRI IDR       1220011559559   Boulevard periode 01 Agust 2023 - 31 Jul 2024               16,000,000   17,777,777          -         1,777,777        16,000,000
                                                        MEDIA SOLUSI NETWORK, PT , Sewa Link Metro-E 50
                                                        Mbps - PT Media Solusi Network 7 site Bapenda Kota
822    22-Nov-23      MANDIRI IDR       1220011559559   Bandung periode Sept 2023                                    7,630,000    7,000,000      770,000        140,000          7,630,000
                                                        SERPONG MAS TELEMATIKA, PT , Biaya Sewa Core FO
                                                        2 core HH Pos Polisi - German Center periode Sept
823    22-Nov-23      MANDIRI IDR       1220011559559   2023                                                         1,635,000    1,500,000      165,000         30,000          1,635,000
                                                        TRANS INDONESIA SUPERKORIDOR, PT , Sewa
                                                        Intercity IDC Duren Tiga - RK0004 Office Gatot
824    22-Nov-23      MANDIRI IDR       1220011559559   Subroto periode 01 - 31 Okt 2023                             9,265,000    8,500,000      935,000        170,000          9,265,000
                                                        TRANS INDONESIA SUPERKORIDOR, PT , Biaya Sewa
                                                        Intercity Jakarta - Diskominfo Cirebon 500Mbps
825    22-Nov-23      MANDIRI IDR       1220011559559   periode 01 - 25 Sept 2023                                    7,720,833    7,083,333      779,166        141,666          7,720,833
                                                        ASOSIASI PENYELENGGARA JASA INTERNET
                                                        INDONESIA , Biaya Penempatan Rak (S2) di APJII
826    22-Nov-23      MANDIRI IDR       1220011559559   Periode Nov 2023                                            10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
                                                        Material ODC, Panel Box dari PT Nobi Putra Angkasa
827    22-Nov-23      MANDIRI IDR       1220011559559   ke WH Serpong                                                1,288,300    1,300,000       14,300         26,000          1,288,300
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Second Bordess dari PT DHJ ke Office
828    22-Nov-23      MANDIRI IDR       1220011559559   Semarang                                                     2,031,550    2,050,000       22,550         41,000          2,031,550
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material STP, Patchcord, Switch dari WH Serpong ke
829    22-Nov-23      MANDIRI IDR       1220011559559   WH Penjernihan dan Office Bandung                            1,238,750    1,250,000       13,750         25,000          1,238,750
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Telematika dari PT DHJ ke CV Ekasindo Energi
830    22-Nov-23      MANDIRI IDR       1220011559559   Doa                                                          4,905,450    4,950,000       54,450         99,000          4,905,450
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material FO Akses Catur Tunggal-005 dari PT KBC ke
831    22-Nov-23      MANDIRI IDR       1220011559559   PT Banyu Manunggal Sejahtera                                 5,450,500    5,500,000       60,500        110,000          5,450,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Subduct HDPE 40/34MM dari PT Alpha
832    22-Nov-23      MANDIRI IDR       1220011559559   Cikupa Makmur ke WH Matraman                                   495,500     500,000         5,500         10,000            495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material JC 48 Core, Battery Lithium 100AH ZTE dari
833    22-Nov-23      MANDIRI IDR       1220011559559   WH Serpong ke Office Matraman                                1,288,300    1,300,000       14,300         26,000          1,288,300
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari PT Prysmian Cable
834    22-Nov-23      MANDIRI IDR       1220011559559   ke PT Rekatama Solusindo                                       594,600     600,000         6,600         12,000            594,600
Page 160
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 46
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                     BANK          DPP            PPN             PPh        NET DIBAYARKAN
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Cable ADSS 48 Core dari WH Serpong ke PT
835    22-Nov-23      MANDIRI IDR       1220011559559   Sekawan Persada Gemilang                                      495,500      500,000         5,500         10,000           495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material FO Crossing dari PT CCSI ke PT Skill
836    22-Nov-23      MANDIRI IDR       1220011559559   Globalindo Sukses                                             495,500      500,000         5,500         10,000           495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Kabel dari WH Serpong ke PT Santa Multi
837    22-Nov-23      MANDIRI IDR       1220011559559   Semesta                                                       495,500      500,000         5,500         10,000           495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
838    22-Nov-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                  495,500      500,000         5,500         10,000           495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Kabel ADSS 32 Core dari PT Prysmian Cable
839    22-Nov-23      MANDIRI IDR       1220011559559   ke PT Dinamikon Inovasi Teknologi                           1,189,200     1,200,000       13,200         24,000         1,189,200
                                                        PERMATA INDO SEJAHTERA, PT , Reimbursement
                                                        Salary Outsource Div. Direct Sales periode Okt 2023,
840    22-Nov-23      MANDIRI IDR       1220011559559   Insentif periode Sept 2023                                105,608,666   104,909,271      854,816        155,421       105,608,666
                                                        TRIMITRA PUTRA MANDIRI, PT , Reimbursement
                                                        Salary Outsource Div. Direct Sales periode Okt 2023,
841    22-Nov-23      MANDIRI IDR       1220011559559   Insentif periode Sept 2023                                184,470,083   183,248,426    1,493,136        271,479       184,470,083
                                                        BINAJASA SUMBER SARANA, PT , Reimbursement
                                                        Salary Outsource Div. Direct Sales periode Okt 2023,
842    22-Nov-23      MANDIRI IDR       1220011559559   Insentif periode Sept 2023                                147,637,385   146,659,654    1,195,004        217,273       147,637,385
                                                        AP-CCTV TECHNICAL FIELD OPERATION , Uang Muka
                                                        Beban Umum atas Biaya Kompensasi Listrik Warga
                                                        Project Jakwifi Batch 3 ( 225 Pole-225 Penerima
                                                        Kompensasi ) Periode 20 November 2023 - 20
843    22-Nov-23      MANDIRI IDR       1220011559559   Februari 2024 -Trf                                        129,600,000   129,600,000          -                -       129,600,000
                                                        AP-CCTV TECHNICAL FIELD OPERATION , Uang Muka
                                                        Beban Umum atas Biaya Kompensasi Listrik Warga
                                                        Project Jakwifi Batch 3 ( 225 Pole-225 Penerima
                                                        Kompensasi ) Periode 20 November 2023 - 20
844    22-Nov-23      MANDIRI IDR       1220011559559   Februari 2024 -Trf                                          9,750,000     9,750,000          -                -         9,750,000
                                                        AP-CCTV TECHNICAL FIELD OPERATION , Uang Muka
                                                        Beban Umum atas Biaya Kompensasi Listrik Warga
                                                        Project Jakwifi Batch 1 ( 808 Pole-811 Penerima
                                                        Kompensasi ) Periode 20 November 2023 - 20
845    22-Nov-23      MANDIRI IDR       1220011559559   Februari 2024 -Trf                                         31,050,000    31,050,000          -                -        31,050,000
                                                        TELCO ABADI JAYA, PT , Pembelian Padlock Jacket
                                                        40MM 500 Pcs, Fiber Optic Tools OTDR JW3302 4
                                                        Unit, Alat Kebersihan Kain Lap Microfiber P 35cm L
846    23-Nov-23        BCA IDR          3193058058     35cm Sebanyak 10 Pcs                                       48,401,550    43,605,000    4,796,550              -        48,401,550
                                                        TELCO ABADI JAYA, PT , Pembelian Plugbooth RJ45
                                                        Biru Sebanyak 5 Pak, Stop Kontak Broco Lobang 3
                                                        Sebanyak 2 Pcs, Alluminium Tape 2inX30m Sebanyak
847    23-Nov-23        BCA IDR          3193058058     5 Pcs, dll                                                  1,925,850     1,735,000      190,850              -         1,925,850
                                                        TELCO ABADI JAYA, PT , Pembelian Cable Ties 30 cm
                                                        Black Outdoor 200 Pcs, Cable Ties 50 cm Black
848    23-Nov-23        BCA IDR          3193058058     Outdoor 500 Pcs                                               779,200      702,000        77,200              -           779,200
                                                        TELCO ABADI JAYA, PT , Pembelian POE Injector With
849    23-Nov-23        BCA IDR          3193058058     Adaptor 1 Port 30W Sebanyak 25 Pcs                          6,521,250     5,875,000      646,250              -         6,521,250
                                                        TELCO ABADI JAYA, PT , Pembelian Solasi Scotch Super
                                                        33+ 3M Sebanyak 80 Unit, Protection Sleeve 6CM
                                                        Sebanyak 10.000 Pcs, Poe Injector With Adaptor 1
850    23-Nov-23        BCA IDR          3193058058     Port 30W Sebanyak 25 Unit,dll                              20,507,250    18,475,000    2,032,250              -        20,507,250
Page 161
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 47
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        RAJAWALI ANUGRAH RESOURCES, PT ,
                                                        Reimbursement Salary Outsource Div. Direct Sales
851    23-Nov-23      MANDIRI IDR       1220011559559   Periode Okt 2023 dan Insentif Periode Sept 2023              95,881,338    95,246,362      776,081        141,105         95,881,338
                                                        ENLULU SUKSES MAKMUR, PT , Reimbursement Salary
                                                        Outsource Div. Direct Sales periode Okt 2023, Insentif
852    23-Nov-23      MANDIRI IDR       1220011559559   periode Sept 2023                                            63,173,402    62,755,035      511,337         92,970         63,173,402
                                                        MULTI USAHA SEJAHTERA BERSAMA, PT ,
                                                        Reimbursement Salary Outsource Div. Direct Sales
853    23-Nov-23      MANDIRI IDR       1220011559559   periode Okt 2023, Insentif periode Sept 2023                249,733,940   248,080,073    2,021,393        367,526        249,733,940
                                                        CELLULAR OPERATION SUPPORT , Uang Muka Beban
                                                        Umum atas FPU Biaya Pembelian Token Urgent Untuk
                                                        Site 806043 Pondok Cabe ilir RW10 (New Site) belum
854    23-Nov-23      MANDIRI IDR       1220011559559   terproposed di Phase 11) -Trf                                 2,007,000     2,007,000          -                -          2,007,000
                                                        LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                        Summarecon Mal Serpong 1 periode 11 Sep 2023 - 10
855    23-Nov-23      MANDIRI IDR       1220011559559   Oct 2023                                                        751,448      744,007        81,841         74,400            751,448
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 11
856    23-Nov-23      MANDIRI IDR       1220011559559   periode 21 Sep 2023 - 20 Oct 2023                               225,348      223,117        24,542         22,311            225,348
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 46
857    23-Nov-23      MANDIRI IDR       1220011559559   periode 21 Sep 2023 - 20 Oct 2023                               215,843      213,706        23,507         21,370            215,843
                                                        PPPSRSS SAHID SUDIRMAN CENTER , Biaya atas
                                                        Pemakaian Listrik di Sahid Sudirman Centre Lt. 29
858    23-Nov-23      MANDIRI IDR       1220011559559   periode 21 Sep 2023 - 20 Oct 2023                               215,843      213,706        23,507         21,370            215,843
                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                        KONDOMINIUM TAMAN ANGGREK , Biaya Sewa
                                                        Penempatan Perangkat Telekomunikasi di Mall &
                                                        Kondominium Taman Anggrek Berdasarkan Profit
859    23-Nov-23      MANDIRI IDR       1220011559559   Sharing Periode Oktober 2023                                 12,093,499    13,437,221          -         1,343,722        12,093,499
                                                        NTT INDONESIA, PT , Sewa NTT Fiber Connect (XC
860    23-Nov-23      MANDIRI IDR       1220011559559   Inter DC Akamai - APJII) periode Okt 2023                     7,085,000     6,500,000      715,000        130,000          7,085,000
                                                        NTT INDONESIA, PT , Biaya Cross-Connect Rack S2
                                                        APJII Lantai 1 ke NTT Lantai 3A (Interkoneksi
861    23-Nov-23      MANDIRI IDR       1220011559559   Facebook) periode Okt 2023                                   10,900,000    10,000,000    1,100,000        200,000         10,900,000
                                                        PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
862    23-Nov-23      MANDIRI IDR       1220011559559   Phase 11 Jabotabek Periode November 2023                    170,309,500   170,309,500          -                -        170,309,500
                                                        PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
863    23-Nov-23      MANDIRI IDR       1220011559559   Phase 11 Jawa Tengah Periode November 2023                  105,717,000   105,717,000          -                -        105,717,000
                                                        AP-CCTV TECHNICAL FIELD OPERATION , Uang Muka
                                                        Beban Umum atas Biaya Kompensasi Listrik Warga
                                                        Project Jakwifi Batch 1 ( 808 Pole-811 Penerima
                                                        Kompensasi ) Periode 20 November 2023 - 20
864    23-Nov-23      MANDIRI IDR       1220011559559   Februari 2024 -Trf                                          412,350,000   412,350,000          -                -        412,350,000
                                                        AP-CCTV TECHNICAL FIELD OPERATION , Uang Muka
                                                        Beban Umum atas Biaya Kompensasi Listrik Warga
                                                        Project Jakwifi Batch 2 ( 1687 Pole - 1742 Penerima
                                                        Kompensasi ) Periode 20 November 2023 - 20
865    24-Nov-23      MANDIRI IDR       1220011559559   Februari 2024 -Trf                                          825,000,000   825,000,000          -                -        825,000,000
                                                        AP-CCTV TECHNICAL FIELD OPERATION , Uang Muka
                                                        Beban Umum atas Biaya Kompensasi Listrik Warga
                                                        Project Jakwifi Batch 2 ( 1687 Pole - 1742 Penerima
                                                        Kompensasi ) Periode 20 November 2023 - 20
866    24-Nov-23      MANDIRI IDR       1220011559559   Februari 2024 -Trf                                           61,650,000    61,650,000          -                -         61,650,000
                                                        JELAJAH DATA SEMESTA, PT , Dedicated Internet
867    24-Nov-23      MANDIRI IDR       1220011559559   Bandwidth 20Gbps periode Okt 2023                           981,000,000   900,000,000   99,000,000      18,000,000       981,000,000
Page 162
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 48
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN             NAMA VENDOR DAN KETERANGAN                          BANK          DPP            PPN             PPh        NET DIBAYARKAN
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
868    28-Nov-23        BCA IDR          3193058058     Bondongan-002 - Paledang-001 periode Nov 2023                4,638,495     4,255,500      468,105         85,110         4,638,495

                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
869    28-Nov-23        BCA IDR          3193058058     Bondongan-002 - Sukasari (POI XL) periode Nov 2023           4,720,245     4,330,500      476,355         86,610         4,720,245
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
870    28-Nov-23        BCA IDR          3193058058     Bondongan-002 - Paledang-001 periode Okt 2023                4,638,495     4,255,500      468,105         85,110         4,638,495

                                                        POWER TELECOM, PT , Sewa Dark Fiber Segmen 11
                                                        (2.037KM) dan (2.038KM) Tegal Gundil-010 - Tanah
                                                        Sareal-005, Section 10 (2.830KM) & (2.831KM)
                                                        Narasoma - Tanah Sareal-005, Section 26 (2.270KM)
871    28-Nov-23        BCA IDR          3193058058     Cikaret-001 - Pasirjaya-001 periode Nov 2023                 5,446,294     4,996,600      549,626         99,932         5,446,294
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber Section
                                                        25 3.965KM Pasirjaya-001 - Paledang-001 periode
872    28-Nov-23        BCA IDR          3193058058     Nov 2023                                                     3,025,295     2,775,500      305,305         55,510         3,025,295
                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber 2core
                                                        segmen HH Jl. Raya Serpong - HH Apartement
873    28-Nov-23        BCA IDR          3193058058     Amazana Residence periode Nov 2023                           6,356,880     5,832,000      641,520        116,640         6,356,880

                                                        POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
874    28-Nov-23        BCA IDR          3193058058     Bondongan-002 - Sukasari (POI XL) periode Okt 2023           4,720,245     4,330,500      476,355         86,610         4,720,245
                                                        PUSAT PENGELOLAAN KOMPLEK KEMAYORAN , Sewa
                                                        Lahan Penempatan Kabel FO Periode 01 Nov 2023 - 31
875    30-Nov-23      MANDIRI IDR       1220011559559   Oktober 2024                                               791,893,760   713,418,000   78,475,760              -       791,893,760
                                                        PUSAT PENGELOLAAN KOMPLEK KEMAYORAN , Sewa
                                                        Lahan Penempatan BTS Hotel Periode 01 Nov 2023 -
876    30-Nov-23      MANDIRI IDR       1220011559559   31 Oktober 2024                                            952,382,000   858,002,000   94,380,000              -       952,382,000
                                                        TELEKOMUNIKASI SELULAR, PT , Biaya Pascabayar
                                                        Paket Data Mikrotik Regional Jawa Timur Periode Nov
877    30-Nov-23      MANDIRI IDR       1220011559559   2023                                                           582,750      525,000        57,750              -           582,750
                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian Cable
878     1-Dec-23        BCA IDR          3193058058     Ties 50cm Black Outdoor Sebanyak 500 Pcs                       219,225      197,500        21,725              -           219,225
                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
879     1-Dec-23        BCA IDR          3193058058     Consumable Thermal Paste 1.5 ml Sebanyak 1 Pcs                 149,850      135,000        14,850              -           149,850
                                                        ALPHA CIPTA COMPUTINDO, PT , Pembelian
880     1-Dec-23        BCA IDR          3193058058     Connector RJ-45 Cat 5E Sebanyak 200 Pcs                        406,260      366,000        40,260              -           406,260
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Kabel, Tiang, Acc dari WH Serpong ke CV
881     1-Dec-23      MANDIRI IDR       1220011559559   Sinar Modern                                                 9,973,500     9,150,000    1,006,500        183,000         9,973,500
                                                        TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                        Material Cable Optical dari PT Furukawa ke WH
882     1-Dec-23      MANDIRI IDR       1220011559559   Serpong                                                      2,398,000     2,200,000      242,000         44,000         2,398,000
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Nokia Wifi Beacon 2 dari WH Serpong ke
883     1-Dec-23      MANDIRI IDR       1220011559559   Office Thamrin Nine                                            495,500      500,000         5,500         10,000           495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari PT CCSI ke PT Jastrikom Mitra
884     1-Dec-23      MANDIRI IDR       1220011559559   Andalan                                                        743,250      750,000         8,250         15,000           743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 32 Core dari PT Prysmian Cable
885     1-Dec-23      MANDIRI IDR       1220011559559   ke PT Dinamikon Inovasi Teknologi                              594,600      600,000         6,600         12,000           594,600

                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
886     1-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari PT CCSI ke PT Mitra Security Asia          743,250      750,000         8,250         15,000           743,250
Page 163
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 49
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari PT CCSI ke PT Dinamikon Inovasi
887     1-Dec-23      MANDIRI IDR       1220011559559   Teknologi                                                      743,250     750,000           8,250         15,000            743,250

                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
888     1-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari PT CCSI ke PT Santa Multi Semesta          743,250     750,000           8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari PT Prysmian Cable
889     1-Dec-23      MANDIRI IDR       1220011559559   ke WH Matraman                                                 594,600     600,000           6,600         12,000            594,600
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
890     1-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman                  495,500     500,000           5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
891     1-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                   495,500     500,000           5,500         10,000            495,500
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable dari PT CCSI ke PT Intisel
892     1-Dec-23      MANDIRI IDR       1220011559559   Prodaktifakom                                                  743,250     750,000           8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 48 Core dari PT Prysmian Cable
893     1-Dec-23      MANDIRI IDR       1220011559559   ke WH Matraman                                                 594,600     600,000           6,600         12,000            594,600
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material JC 24 & 96 Core, Battery Lithium 48V 100AH
894     1-Dec-23      MANDIRI IDR       1220011559559   ZTE dari WH Serpong ke WH Matraman                             644,150     650,000           7,150         13,000            644,150

                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
895     1-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari PT CCSI ke PT Wira Surya Mandiri           743,250     750,000           8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                        Material Cable ADSS 96 Core dari PT Prysmian Cable
896     1-Dec-23      MANDIRI IDR       1220011559559   ke PT Dinamikon Inovasi Teknologi                              594,600     600,000           6,600         12,000            594,600

                                                        PRIMACOM INTERBUANA, PT , Sewa Layanan Koneksi
                                                        Backhaul 1500Mbps Wisma Bumiputera (BBU) -
897     1-Dec-23      MANDIRI IDR       1220011559559   Balitower Regional Jawa Barat periode Okt 2023               3,270,000    3,000,000        330,000         60,000          3,270,000
                                                        PRIMACOM INTERBUANA, PT , Sewa Local Loop
                                                        10Mbps Diskominfo Kota Bandung sebanyak 30 Site
898     1-Dec-23      MANDIRI IDR       1220011559559   CCTV periode Okt 2023                                       26,160,000   24,000,000      2,640,000        480,000         26,160,000
                                                        PRIMACOM INTERBUANA, PT , Sewa Local Loop 25
                                                        Mbps Diskominfo Kota Bandung CCTV sebanyak 54
899     1-Dec-23      MANDIRI IDR       1220011559559   Titik periode Okt 2023                                      58,860,000   54,000,000      5,940,000       1,080,000        58,860,000

                                                        NOTARIS STEFANIE HARTANTO , Jasa Pembuatan Akta
                                                        Perjanjian Sewa Menyewa site Cibeureum Hilir, Kota
900     1-Dec-23      MANDIRI IDR       1220011559559   Sukabumi (Bpk. Budi Permana Azis Soemantri)                    750,750     770,000             -           19,250            750,750

                                                        NOTARIS STEFANIE HARTANTO , Jasa Pembuatan Akta
                                                        Perjanjian Sewa Menyewa site Cengkareng Timur,
901     1-Dec-23      MANDIRI IDR       1220011559559   Jakarta Barat (PT Reka Rumanda Agung Abadi)                    750,750     770,000             -           19,250            750,750
                                                        CORE MEDIATECH, PT , Sewa Local Loop 10 Mbps
902     1-Dec-23      MANDIRI IDR       1220011559559   untuk Tenant BC Card periode Nov 2023                        3,379,000    3,100,000        341,000         62,000          3,379,000
                                                        CORE MEDIATECH, PT , Sewa Local Loop 100Mbps PT
                                                        Core Mediatech untuk Kebutuhan Tenant PT Karya
903     1-Dec-23      MANDIRI IDR       1220011559559   Central Bisnis periode Nov 2023                              7,630,000    7,000,000        770,000        140,000          7,630,000
                                                        SMART TELECOM, PT , Tagihan Telepon Divisi Contact
904     1-Dec-23      MANDIRI IDR       1220011559559   Center Bulan Sept 2023                                          89,173         80,336        8,837              -             89,173
                                                        SMART TELECOM, PT , Tagihan Telepon Divisi Contact
905     1-Dec-23      MANDIRI IDR       1220011559559   Center Bulan Sept 2023                                          18,109         16,314        1,795              -             18,109
Page 164
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 50
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                        CYBER NETWORK INDONESIA, PT , Sewa Interkoneksi
                                                        UTP Rak - PT Cyber Network Indonesia - Rak 28 ke Rak
                                                        21 (Moratel) untuk kebutuhan PT Prasetya
906     1-Dec-23      MANDIRI IDR       1220011559559   Dwidharma                                                     3,924,000    3,600,000        396,000         72,000          3,924,000
                                                        TECHNOLOGY DATA INDONESIA, PT , Biaya Sewa Rack
                                                        Summer 243 IDC Duren Tiga (Colocation 1/2 Rack)
907     1-Dec-23      MANDIRI IDR       1220011559559   Periode 1 s/d 30 Nov 2023                                     7,630,000    7,000,000        770,000        140,000          7,630,000
                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH SUSUN KOMERSIAL CAMPURAN SEMENTARA
                                                        APARTEMENT SATU8 RESIDENCE , Tagihan Revenue
                                                        Sharing Bali Fiber di Apartement Satu8 Periode April -
908     1-Dec-23      MANDIRI IDR       1220011559559   Juni 2023                                                       654,232     667,583             -           13,351            654,232
                                                        PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                        RUMAH SUSUN KOMERSIAL CAMPURAN SEMENTARA
                                                        APARTEMENT SATU8 RESIDENCE , Tagihan Revenue
                                                        Sharing Bali Fiber di Apartement Satu8 Periode Juli -
909     1-Dec-23      MANDIRI IDR       1220011559559   September 2023                                                  663,288     676,824             -           13,536            663,288

                                                        PAKARTI JAYA, PT , Biaya Penempatan Sewa Perangkat
                                                        Telekomunikasi berdasarkan Revenue Sharing periode
910     1-Dec-23      MANDIRI IDR       1220011559559   Juli - September 2023 di Gedung Pakarti Center                  915,600     840,000          92,400         16,800            915,600
                                                        GRIYA MURIA KENCANA, PT , Tagihan Revenue
                                                        Sharing periode September 2023 atas Penempatan
911     1-Dec-23      MANDIRI IDR       1220011559559   Perangkat Telekomunikasi di Gedung Prince Center                737,300     730,000          80,300         73,000            737,300
                                                        ARYAVENTURA REALTY, PT , Biaya atas Pemakaian
912     1-Dec-23      MANDIRI IDR       1220011559559   Listrik di Gedung Aryaventura periode Oct 2023                  194,508     192,582          21,184         19,258            194,508
                                                        MENARA DUTA, PT , Biaya atas Pemakaian Listrik
913     1-Dec-23      MANDIRI IDR       1220011559559   Menara Duta Periode Oct 2023                                    128,406     127,134          13,985         12,713            128,406

                                                        PERHIMPUNAN PENGHUNI WISMA STACO , Biaya atas
914     1-Dec-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Wisma Staco periode Oct 2023               154,505     171,672             -           17,167            154,505
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                        4/B.071 (Call Center) Periode 18 Sep 2022 - 17 Oct
915     1-Dec-23      MANDIRI IDR       1220011559559   2023                                                         12,544,314   13,938,126            -         1,393,812        12,544,314
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
916     1-Dec-23      MANDIRI IDR       1220011559559   Periode 18 Sep 2022 - 17 Oct 2023                             2,655,478    2,950,531            -          295,053          2,655,478
                                                        CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Green Sedayu Mall
917     1-Dec-23      MANDIRI IDR       1220011559559   General 4 Lt.2 periode Oct 2023                                 257,723     236,443          26,008          4,728            257,723
                                                        DONNELLY PARAMITA UTAMA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Transavia Land/Graha
918     1-Dec-23      MANDIRI IDR       1220011559559   Paramita periode Oct 2023                                       305,498     302,473          33,272         30,247            305,498
                                                        PUALAM KENCANA GEMILANG JAKARTA, PT , Biaya
                                                        atas Pemakaian Listrik di Gedung Perwata Tower
919     1-Dec-23      MANDIRI IDR       1220011559559   periode 26 Sep 2023 - 25 Oct 2023                               606,439     600,435          66,047         60,043            606,439

                                                        PLAZA INDONESIA REALTY TBK, PT , Biaya atas
920     1-Dec-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Plaza Indonesia periode Oct 2023           453,072     448,586          49,344         44,858            453,072
                                                        FANAH JAYA MAINDO, PT , Pembelian Cable Power
                                                        NYAF 10MM Black Supreme Sebanyak 1.000 Mtr,
921     1-Dec-23      MANDIRI IDR       1220011559559   Cable Power NYAF 10MM Red Sebanyak 1.000 Mtr                 47,026,260   42,366,000      4,660,260              -         47,026,260
                                                        FANAH JAYA MAINDO, PT , Pembelian Consumable
                                                        Velcro 1CM Sebanyak 10 Mtr untuk Kebutuhan
922     1-Dec-23      MANDIRI IDR       1220011559559   Administration Support                                           66,600         60,000        6,600              -             66,600
Page 165
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 51
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh         NET DIBAYARKAN

                                                        PEMERINTAH KOTA CIMAHI , Uang Muka Beban
                                                        Umum atas Biaya Retribusi Pengendalian Menara
                                                        Telekomunikasi Wilayah Kota Cimahi Periode 24
                                                        Oktober 2023 s/d 23 Oktober 2024 (2 site) CIpageran-
923     1-Dec-23      MANDIRI IDR       1220011559559   002 & Leuwigajah-010 - PR :1010035643 -Trf                  11,161,600   11,161,600          -                -         11,161,600
                                                        WIJAYA KARYA REALTY, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Tamansari Parama Periode 01 Oct
924     1-Dec-23      MANDIRI IDR       1220011559559   2023 - 31 Oct 2023                                           1,206,697    1,231,323          -           24,626          1,206,697

                                                        MEDIA SOLUSI NETWORK, PT , Sewa Link Metro-E 50
                                                        Mbps - PT Media Solusi Network 7 site Bapenda Kota
925     1-Dec-23      MANDIRI IDR       1220011559559   Bandung periode Maret dan periode 1-6 Apr 2023              64,092,000   58,800,000    6,468,000       1,176,000        64,092,000
                                                        DUNIA MAKMUR PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Plaza Summarecon Bekasi
926     1-Dec-23      MANDIRI IDR       1220011559559   Periode Sep 2023                                               740,202     732,873        80,616         73,287            740,202
                                                        DUNIA MAKMUR PROPERTI, PT , Biaya atas
                                                        Pemakaian Listrik di Plaza Summarecon Bekasi
927     1-Dec-23      MANDIRI IDR       1220011559559   Periode Oct 2023                                               762,025     754,479        82,993         75,447            762,025
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
928     4-Dec-23      MANDIRI IDR       1220011559559   Material dari WH Serpong ke WH Bali                          6,391,950    6,450,000       70,950        129,000          6,391,950
                                                        PERSADA BATAVIA MANDIRI, PT , Biaya Pengiriman
929     4-Dec-23      MANDIRI IDR       1220011559559   Material dari PT Nobi Putra Angkasa ke WH Bali               6,887,450    6,950,000       76,450        139,000          6,887,450
                                                        INTERNETINDO DATA CENTRA INDONESIA, PT , Biaya
                                                        Sewa Penambahan Redundant Power Source Rack
930     4-Dec-23      MANDIRI IDR       1220011559559   Winter 233 periode Nov 2023                                  2,180,000    2,000,000      220,000         40,000          2,180,000
                                                        TECHNOLOGY DATA INDONESIA, PT , Tagihan
                                                        Reimbursement Listrik Rack No. Summer 243 Periode
931     4-Dec-23      MANDIRI IDR       1220011559559   Okt 2023                                                     5,341,000    4,900,000      539,000         98,000          5,341,000
                                                        RUSUN DAKOTA KEMAYORAN , Sewa Penempatan
                                                        Perangkat di Rusun Dakota Kemayoran periode 30 Apr
932     4-Dec-23      MANDIRI IDR       1220011559559   2023 - 29 Apr 2024                                          12,000,000   13,333,333          -         1,333,333        12,000,000
                                                        ARAYA MEDIA, CV , Sewa Local Loop 100Mbps
                                                        Omadata DC ke Prambon Sidoarjo untuk Tenant PT
933     4-Dec-23      MANDIRI IDR       1220011559559   Argo Boga Utama periode Nov 2023                             5,995,000    5,500,000      605,000        110,000          5,995,000
                                                        GEMILANG CATUR PERSADA, PT , Biaya Sewa Local
                                                        Loop 2 Gbps (Alcen) - Omadata Surabaya periode Nov
934     4-Dec-23      MANDIRI IDR       1220011559559   2023                                                        28,132,000   25,810,000    2,838,000        516,000         28,132,000
                                                        HIJAU TEDUH SAKA PERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di Gedung Sastra Graha Periode 11
935     4-Dec-23      MANDIRI IDR       1220011559559   Oct 2023 - 10 Nov 2023                                         135,157     150,174           -           15,017            135,157
                                                        HIJAU TEDUH SAKA PERSADA, PT , Sewa Penempatan
                                                        Perangkat di Gedung Sastra Graha periode 28 Nov
936     4-Dec-23      MANDIRI IDR       1220011559559   2023 - 27 Nov 2024                                           7,070,000    7,000,000      770,000        700,000          7,070,000
                                                        TRI PURA INDAH PERSADA, PT , Sewa Penempatan
                                                        Perangkat di Gedung Wirausaha periode 01 Des 2023 -
937     4-Dec-23      MANDIRI IDR       1220011559559   30 Nov 2024                                                 25,250,000   25,000,000    2,750,000       2,500,000        25,250,000
                                                        MENARA THAMRIN, PT , Biaya atas Pemakaian Listrik
                                                        di Gedung Menara Thamrin Suite 21 & 6 periode Oct
938     4-Dec-23      MANDIRI IDR       1220011559559   2023                                                           232,735     230,431        25,347         23,043            232,735
                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
939     4-Dec-23      MANDIRI IDR       1220011559559   Listrik di The Springlake View periode Oct 2023                749,512     742,091        81,630         74,209            749,512

                                                        SUMMARECON AGUNG, PT , Biaya atas Pemakaian
940     4-Dec-23      MANDIRI IDR       1220011559559   Listrik di The Springlake Apartement periode Oct 2023          529,294     524,053        57,646         52,405            529,294
                                                        AMAZANA KENCANA, PT , Biaya atas Pemakaian
941     4-Dec-23      MANDIRI IDR       1220011559559   Listrik Apartemen Amazana Periode Oct 2023                     433,978     398,144        43,796          7,962            433,978
Page 166
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 52
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                        Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
942     4-Dec-23      MANDIRI IDR       1220011559559   Periode 18 Sep 2022 - 17 Oct 2023                            1,268,227     1,409,141          -          140,914          1,268,227
                                                        LIZA CHRISTINA GARMENT INDUSTRY, PT , Sewa
                                                        Penempatan Perangkat di Gedung Unity Building
943     4-Dec-23      MANDIRI IDR       1220011559559   periode 18 Okt 2023 - 17 Okt 2024                           10,100,000    10,000,000    1,100,000       1,000,000        10,100,000
                                                        CYBER NETWORK INDONESIA, PT , Sewa Colocation
                                                        Rack IU OTB (MMR) PKS 402/PKS/CNI/VI/2023
944     4-Dec-23      MANDIRI IDR       1220011559559   periode Nov 2023                                             3,597,000     3,300,000      363,000         66,000          3,597,000
                                                        CYBER NETWORK INDONESIA, PT , Sewa Colocation
                                                        Rack IU OTB (MMR) PKS 401/PKS/CNI/VII/2023
945     4-Dec-23      MANDIRI IDR       1220011559559   periode Nov 2023                                             3,297,250     3,025,000      332,750         60,500          3,297,250
                                                        INTI ALGORITMA PERDANA, PT , Sewa Alat / kabel
                                                        Fiber Optic Pass Through PT Darya Varia Laboratoria
946     4-Dec-23      MANDIRI IDR       1220011559559   periode Jul - Sept 2023                                     32,700,000    30,000,000    3,300,000        600,000         32,700,000
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material JC 48 Core, Battery Lithium, Router, SFP,
947     4-Dec-23      MANDIRI IDR       1220011559559   Switch dari WH Serpong ke WH Matraman                          644,150      650,000         7,150         13,000            644,150
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
948     4-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman                  495,500      500,000         5,500         10,000            495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
949     4-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                   495,500      500,000         5,500         10,000            495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
950     4-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                   495,500      500,000         5,500         10,000            495,500
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Kabel dari PT CCSI ke PT Aliansi Inovasi
951     4-Dec-23      MANDIRI IDR       1220011559559   Global                                                         743,250      750,000         8,250         15,000            743,250
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Kabel dari PT CCSI ke PT Dinamikon Inovasi
952     4-Dec-23      MANDIRI IDR       1220011559559   Teknologi                                                      743,250      750,000         8,250         15,000            743,250
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Kabel dari PT CCSI ke PT Langgeng Karta
953     4-Dec-23      MANDIRI IDR       1220011559559   Teknik                                                         743,250      750,000         8,250         15,000            743,250
                                                        AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                        Material Kabel dari PT CCSI ke PT Bima Sakti Selular
954     4-Dec-23      MANDIRI IDR       1220011559559   Indonesia                                                      743,250      750,000         8,250         15,000            743,250
                                                        CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
955     4-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman                  495,500      500,000         5,500         10,000            495,500
                                                        SURYA FAJAR INDONESIA, PT , Biaya Pengiriman
                                                        Material FO Cable Relokasi Non SJUT dari PT CCSI ke
956     4-Dec-23      MANDIRI IDR       1220011559559   PT Fajar Mitra Krida Abadi                                   1,465,950     1,450,000       15,950              -          1,465,950
                                                        SURYA FAJAR INDONESIA, PT , Biaya Pengiriman
                                                        Material JC 24 & 96 Core, Battery Lithium 48V 100AH
957     4-Dec-23      MANDIRI IDR       1220011559559   ZTE dari WH Serpong ke WH Matraman                             657,150      650,000         7,150              -            657,150
                                                        SURYA FAJAR INDONESIA, PT , Biaya Pengiriman
                                                        Material Cable dari PT CCSI ke PT Aliansi Inovasi
958     4-Dec-23      MANDIRI IDR       1220011559559   Global                                                         758,250      750,000         8,250              -            758,250
                                                        SURYA FAJAR INDONESIA, PT , Biaya Pengiriman
                                                        Material Cable ADSS 32 Core dari WH Serpong ke PT
959     4-Dec-23      MANDIRI IDR       1220011559559   Sekawan Persada Gemilang                                       505,500      500,000         5,500              -            505,500
                                                        BUMI SERPONG DAMAI, PT , Uang Muka Beban
                                                        Umum atas Biaya Open Booth di Apartment Serpong
960     4-Dec-23      MANDIRI IDR       1220011559559   Mas Telematika BSD City 2023                                 6,369,369     6,369,369          -                -          6,369,369
                                                        DANAMAS INSAN KREASI ANDALAN, PT ,
                                                        Reimbursement Salary Outsource Div. Direct Sales
961     4-Dec-23      MANDIRI IDR       1220011559559   periode Okt 2023, Insentif periode Sept 2023               242,573,371   240,966,924    1,963,435        356,988        242,573,371
Page 167
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 53
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                        TEKNOVATUS SOLUSI SEJAHTERA, PT , Tagihan Sewa
                                                        Collocation Rack 47 U 19" periode Nov 2023 dan
962     4-Dec-23      MANDIRI IDR       1220011559559   Kelebihan Pemakaian Listrik periode Okt 2023                27,454,375    25,187,500    2,770,625        503,750         27,454,375

                                                        FPU GABUNGAN , Pembelian Material Lakban, Isolasi
                                                        dan Battery Untuk Kebutuhan Project Event Red Hat
                                                        BNDCC Nusa Dua serta Pembelian Material Longdratt
963     5-Dec-23      SINARMAS IDR       0002999994     + Nut untuk Pemasangan Bracket Rak Collo Telkomsel           1,495,500     1,495,500          -                -          1,495,500
                                                        SITAC , Uang Muka Beban Umum atas Pengajuan
                                                        Pembayaran Bulan (Pertama) Sewa Lahan Site 499515
                                                        Combat Tibubeneng-003 (Periode 29 Nov 2023 s/d 29
964     5-Dec-23      SINARMAS IDR       0002999994     Dec 2023)                                                    4,500,000     4,500,000          -                -          4,500,000
                                                        AREA KLUNGKUNG , Biaya retribusi pengendalian
                                                        menara telekomunikasi kabupaten Klungkung Tahun
965     5-Dec-23      SINARMAS IDR       0002999994     2023                                                         3,520,000     3,520,000          -                -          3,520,000
                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian perpanjangan sewa lahan site 13 Pecatu
                                                        (PO Rp.2.769.231,- Potongan PPh 21(2.5%) Rp.69.231,-
966     5-Dec-23      SINARMAS IDR       0002999994     )                                                            2,700,000     2,769,231          -           69,231          2,700,000

                                                        I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                        perjanjian sewa lahan site 751190 Abiansemal-001
967     5-Dec-23      SINARMAS IDR       0002999994     (PO Rp.846.154,-Potongan PPh 21(2.5%) Rp.21.154,-)             825,000      846,154           -           21,154            825,000
                                                        PLN PERSERO, PT , Pembelian Token PLN di 25 site
                                                        KWH prabayar periode pemakaian bulan Desember
968     5-Dec-23      SINARMAS IDR       0002999994     2023                                                        38,735,000    38,735,000          -                -         38,735,000
                                                        AP-CCTV FIELD OPERATION , Uang Muka Beban
                                                        Umum atas Biaya Kompensasi Listrik Warga Project
                                                        Jakwifi Batch 2 ( 3 Pole-3 Penerima Kompensasi )
969     5-Dec-23      MANDIRI IDR       1220011559559   Periode 20 November 2023 - 20 Februari 2024-Trf              1,350,000     1,350,000          -                -          1,350,000
                                                        SERPONG CIPTA KREASI, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Serpong M-Town Residence Periode
970     5-Dec-23      MANDIRI IDR       1220011559559   Aug 2023                                                     1,111,744     1,100,736      121,081        110,073          1,111,744
                                                        SERPONG CIPTA KREASI, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Serpong M-Town Residence Periode
971     5-Dec-23      MANDIRI IDR       1220011559559   Sep 2023                                                     1,118,540     1,107,465      121,821        110,746          1,118,540
                                                        SERPONG CIPTA KREASI, PT , Biaya atas Pemakaian
                                                        Listrik di Gedung Serpong M-Town Residence Periode
972     5-Dec-23      MANDIRI IDR       1220011559559   Oct 2023                                                     1,227,271     1,215,120      133,663        121,512          1,227,271
                                                        ASSET PACIFIC, PT , Biaya atas Pemakaian Listrik di
973     5-Dec-23      MANDIRI IDR       1220011559559   Gedung Menara Salemba periode Oct 2023                         121,338      120,136        13,215         12,013            121,338
                                                        NTT INDONESIA, PT , Biaya Cross-Connect Rack S2
                                                        APJII Lantai 1 ke NTT Lantai 3A (Interkoneksi
974     5-Dec-23      MANDIRI IDR       1220011559559   Facebook) periode Nov 2023                                  10,900,000    10,000,000    1,100,000        200,000         10,900,000
                                                        NTT INDONESIA, PT , Sewa NTT Fiber Connect (XC
975     5-Dec-23      MANDIRI IDR       1220011559559   Inter DC Akamai - APJII) periode Nov 2023                    7,085,000     6,500,000      715,000        130,000          7,085,000
                                                        MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                        dari MP Pegangsaan Dua ke NDC Jatinegara periode
976     5-Dec-23      MANDIRI IDR       1220011559559   13.07.2023 - 12.08.2023                                      4,578,000     4,200,000      462,000         84,000          4,578,000

                                                        SUKA DUKA RAYA KAMPIAL , Biaya Management Fee
                                                        atas Revenue Sharing periode Juli - September 2023 di
977     6-Dec-23      MANDIRI IDR       1220011559559   Suka Duka Raya Kampial - Perumahan Raya Kampial             13,685,267    14,255,486          -          570,219         13,685,267
                                                        CIRCLECOM NUSANTARA INDONESIA, PT , Sewa Lahan
                                                        di Kawasan Pantai Indah Kapuk site Kapuk Muara-043
                                                        dan Kapuk Muara-015 periode 17 Sept 2023 - 16 Sept
978     6-Dec-23      MANDIRI IDR       1220011559559   2024                                                       121,200,000   120,000,000   13,200,000      12,000,000       121,200,000
Page 168
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                             Page 54
Rincian Modal Kerja

        TANGGAL
      PENGELUARAN                      NOMOR REKENING
         DI BANK  REKENING BANK YANG     BANK YANG                                                           NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.    STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                     BANK          DPP             PPN             PPh        NET DIBAYARKAN
                                                        DITJEN POSTEL , BHP Frekuensi Periode 31 Desember
                                                        2023 s.d 30 Desember 2024 - No. Aplikasi :
979     6-Dec-23      MANDIRI IDR       1220011559559   2487452122021                                            14,102,124   14,102,124            -                -        14,102,124
                                                        PLN PERSERO, PT , Biaya Pembelian Token Listrik
980     6-Dec-23      MANDIRI IDR       1220011559559   untuk KWH PLN Site Pekiringan-001                           101,750     101,750             -                -           101,750

                                                        XL AXIATA TBK, PT , Biaya Pembelian Top Up Paket
                                                        Data Mikrotik site Tawangsari-008 Tenant Smartfren
981     6-Dec-23      MANDIRI IDR       1220011559559   Periode November 2023 Region Jawa Tengah                     61,500         61,500          -                -            61,500
                                                        BUMI SERPONG DAMAI, PT , Biaya untuk Registrai
                                                        Open Booth di Apt Greenwich Cluster Tabebuya -
982     6-Dec-23      MANDIRI IDR       1220011559559   September 2023 (Inv: 30A2-23 0002432)                     1,273,874    1,261,261        138,739        126,126         1,273,874

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 12 Des
983     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 11 Des 2024 - No. Aplikasi : 025460122014        7,520,184    7,520,184            -                -         7,520,184

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 12 Des
984     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 11 Des 2024 - No. Aplikasi : 025461122014        7,520,184    7,520,184            -                -         7,520,184

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 12 Des
985     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 11 Des 2024 - No. Aplikasi : 025462122014        7,520,184    7,520,184            -                -         7,520,184

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 12 Des
986     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 11 Des 2024 - No. Aplikasi : 025463122014        7,520,184    7,520,184            -                -         7,520,184

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
987     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025559122014        7,012,504    7,012,504            -                -         7,012,504

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
988     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025560122014        7,012,504    7,012,504            -                -         7,012,504

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
989     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025633122014        7,074,700    7,074,700            -                -         7,074,700

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
990     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025634122014        7,074,700    7,074,700            -                -         7,074,700

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
991     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025306122017        9,859,114    9,859,114            -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
992     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025307122017        9,859,114    9,859,114            -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
993     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025308122017        9,859,114    9,859,114            -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
994     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025309122017        9,859,114    9,859,114            -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
995     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025310122017        9,859,114    9,859,114            -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
996     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025311122017        9,859,114    9,859,114            -                -         9,859,114

                                                        DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
997     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025312122017        9,859,114    9,859,114            -                -         9,859,114
Page 169
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 55
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN

                                                         DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
998      7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025313122017          9,859,114     9,859,114          -                -          9,859,114

                                                         DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
999      7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025314122017          9,837,346     9,837,346          -                -          9,837,346

                                                         DITJEN POSTEL , BHP Frekuensi Radio Periode 19 Des
1000     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 18 Des 2024 - No. Aplikasi : 025315122017          9,837,346     9,837,346          -                -          9,837,346

                                                         DITJEN POSTEL , BHP Frekuensi Radio Periode 22 Des
1001     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 21 Des 2024 - No. Aplikasi : 02483327122021        9,862,220     9,862,220          -                -          9,862,220

                                                         DITJEN POSTEL , BHP Frekuensi Radio Periode 22 Des
1002     7-Dec-23      MANDIRI IDR       1220011559559   2023 s.d 21 Des 2024 - No. Aplikasi : 02483328122021        9,862,220     9,862,220          -                -          9,862,220
                                                         EQUINIX SINGAPORE PTE LTD , Biaya Sewa Rack
                                                         Colocation dan Interkoneksi Equinix Singapore
1003     7-Dec-23      SINARMAS IDR       0000240408     periode Nov 2023                                          102,413,817   102,413,817          -                -        102,413,817
                                                         ARELION SINGAPORE Pte Ltd. , Biaya Sewa Telia IP
1004     7-Dec-23     SINARMAS USD        0000670707     Transit 3Gbps Periode Okt 2023                             37,161,600    37,161,600          -                -         37,161,600
                                                         CHINA MOBILE INTERNATIONAL LTD , IP Transit
1005     7-Dec-23     SINARMAS USD        0000670707     Equinix SG 50Mbps Periode Nov 2023                         10,095,568    10,095,568          -                -         10,095,568
                                                         CHINA MOBILE INTERNATIONAL LTD , IP Transit
1006     7-Dec-23     SINARMAS USD        0000670707     Equinix SG 20Mbps Periode Nov 2023                          7,277,480     7,277,480          -                -          7,277,480

                                                         CELLULAR OPERATION SUPPORT , Uang Muka Beban
                                                         Umum atas 315_FPU Biaya Pembelian Token Urgent
                                                         Untuk Site 709704 Bondongan-002 Periode Oktober
1007     7-Dec-23      MANDIRI IDR       1220011559559   2023 (Terlewat Proposed di Phase 11) - Trf                  3,010,500     3,010,500          -                -          3,010,500

                                                         MARKETING COMMUNICATION , Uang Muka Beban
                                                         Umum atas Biaya Open Booth Balifiber di Apartment
1008     7-Dec-23      MANDIRI IDR       1220011559559   M-Town Residences periode 1 - 31 Januari 2024 - Trf         1,212,000     1,212,000          -                -          1,212,000
                                                         INFRA YES SOLUSINDO, PT , Biaya Open Booth
                                                         Balifiber di Apartement Green Pramuka City periode
1009     7-Dec-23      MANDIRI IDR       1220011559559   15 Sept 2023 - 14 Okt 2023                                  3,920,000     4,000,000          -           80,000          3,920,000
                                                         INFRA YES SOLUSINDO, PT , Biaya Open Booth
                                                         Balifiber di Apartement Green Pramuka City periode
1010     7-Dec-23      MANDIRI IDR       1220011559559   15 Okt 2023 - 14 Nov 2023                                   3,920,000     4,000,000          -           80,000          3,920,000
                                                         DITJEN POSTEL , BHP Frekuensi Periode 15 November
                                                         2023 s.d 14 November 2024 - No. Aplikasi :
1011     8-Dec-23      MANDIRI IDR       1220011559559   02934288112023                                              7,103,728     7,103,728          -                -          7,103,728
                                                         DITJEN POSTEL , BHP Frekuensi Periode 15 November
                                                         2023 s.d 14 November 2024 - No. Aplikasi :
1012     8-Dec-23      MANDIRI IDR       1220011559559   02934287112023                                              7,103,728     7,103,728          -                -          7,103,728
                                                         ARYAVENTURA REALTY, PT , Sewa Penempatan
                                                         Perangkat di Gedung Ventura periode 01 Nov 2023 -
1013     8-Dec-23      MANDIRI IDR       1220011559559   31 Okt 2024                                                32,080,125    31,762,500    3,493,875       3,176,250        32,080,125
                                                         FPU PENJAGA SITE , Biaya pembayaran penjaga site
                                                         dan uang canang bulan November 2023 (Non transfer
1014    11-Dec-23      SINARMAS IDR       0002999994     bank sinarmas di 3 site BTS)                                2,400,000     2,400,000          -                -          2,400,000
                                                         CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
1015    11-Dec-23      MANDIRI IDR       1220011559559   Material dari PT DHJ ke WH Bali                            14,765,900    14,900,000      163,900        298,000         14,765,900
                                                         FPU PENJAGA SITE , Biaya pembayaran penjaga site
                                                         dan uang canang bulan November 2023 (Transfer
1016    11-Dec-23      MANDIRI IDR       1220011559559   bank sinarmas di 65 site BTS)                              38,700,000    38,700,000          -                -         38,700,000
Page 170
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 56
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP           PPN             PPh         NET DIBAYARKAN

                                                         SERPONG MAS TELEMATIKA, PT , Biaya Management
                                                         Fee atas Revenue Sharing Residential periode Agustus
1017    11-Dec-23      MANDIRI IDR       1220011559559   2023 di Kawasan Bumi Serpong Damai                            9,875,270    9,059,880      996,587        181,197          9,875,270

                                                         GRAHA MULTI MEDIA NUSANTARA, PT , Biaya
                                                         Management Fee atas Revenue Sharing periode Juli -
1018    11-Dec-23      MANDIRI IDR       1220011559559   September 2023 di Kawasan Apartement Element                 13,768,277   12,631,446    1,389,459        252,628         13,768,277
                                                         QUIROS NETWORKS, PT , Biaya Pemakaian Telepon
1019    11-Dec-23      MANDIRI IDR       1220011559559   Call Center Bulan Okt 2023                                   12,300,597   11,081,619    1,218,978              -         12,300,597

                                                         SMART MILENIUM EFFISIENSI, PT , Biaya Pemakaian
1020    11-Dec-23      MANDIRI IDR       1220011559559   Pulsa Telepon Pelanggan Corporate periode Sept 2023           1,913,999    1,724,324      189,675              -          1,913,999
                                                         JAKARTA KEMAYORAN PROPERTI, PT , Sewa
                                                         Penempatan Perangkat di Gedung Mega Kemayoran
1021    11-Dec-23      MANDIRI IDR       1220011559559   periode 01 Sept 2023 - 31 Agust 2024                         37,117,500   36,750,000    4,042,500       3,675,000        37,117,500
                                                         SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                         (BOD) 50 Mbps untuk Kebutuhan PT BSD Auditorium
1022    11-Dec-23      MANDIRI IDR       1220011559559   GOP 9 periode 14 - 15 Jul 2023                                2,789,310    2,559,000      281,490         51,180          2,789,310
                                                         SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                         Dedicated dan Broadband West BSD untuk 52 Tenant
1023    11-Dec-23      MANDIRI IDR       1220011559559   periode Sept 2023                                            80,213,100   73,590,000    8,094,900       1,471,800        80,213,100
                                                         SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                         (BOD) 300Mbps untuk Kebutuhan PT Lingkar Niaga
1024    11-Dec-23      MANDIRI IDR       1220011559559   Solusindo Qbig periode 25-26 Agust 2023                      10,893,460    9,994,000    1,099,340        199,880         10,893,460

                                                         INTERNETINDO DATA CENTRA INDONESIA, PT , Sewa
1025    11-Dec-23      MANDIRI IDR       1220011559559   Crossconnect 3D 5 UTP dan 3D 3 FO periode Nov 2023            3,270,000    3,000,000      330,000         60,000          3,270,000
                                                         TEKNOVATUS SOLUSI SEJAHTERA, PT , Sewa
                                                         Colocation Rack & MMR Connect untuk Tenant PT
                                                         Wirecard Technologies Indonesia periode 01 - 30 Nov
1026    11-Dec-23      MANDIRI IDR       1220011559559   2023                                                          6,022,250    5,525,000      607,750        110,500          6,022,250
                                                         TEKNOVATUS SOLUSI SEJAHTERA, PT , Biaya Sewa
                                                         MMR Switch ISP to Rack Bali Tower Periode 01 - 30
1027    11-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                        635,834     583,333        64,167         11,666            635,834
                                                         MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
1028    11-Dec-23      MANDIRI IDR       1220011559559   Aplikasi Call Center Centerix periode Nov 2023               10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                         MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
                                                         Aplikasi Call Center Centerix periode Nov 2023
1029    11-Dec-23      MANDIRI IDR       1220011559559   (Additional 5qty)                                             5,450,000    5,000,000      550,000        100,000          5,450,000
                                                         MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
                                                         Aplikasi Call Center Centerix periode Nov 2023
1030    11-Dec-23      MANDIRI IDR       1220011559559   (Additional 10qty)                                           10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                         MOXCAL TEKNOLOGI, PT , Tagihan Sewa Modul
                                                         Aplikasi Call Center Centerix periode 17 Okt 2023 - 16
1031    11-Dec-23      MANDIRI IDR       1220011559559   Nov 2023 (Additional 10qty)                                  10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                         MEGA AKSES PERSADA, PT , Sewa Local Loop 10 Mbps
                                                         PT Mega Akses Perkasa untuk Kebutuhan PT Kyndryl
1032    11-Dec-23      MANDIRI IDR       1220011559559   Solutions Indonesia periode Nov 2023                          2,289,000    2,100,000      231,000         42,000          2,289,000
                                                         PENGELOLA LANDMARK PLUIT, PT , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Gedung
                                                         Landmark Pluit Berdasarkan Revenue Sharing periode
1033    11-Dec-23      MANDIRI IDR       1220011559559   Juli - September 2023                                        26,322,294   26,061,677    2,866,784       2,606,167        26,322,294
                                                         API METRA GRAHA, PT , Tagihan Revenue Sharing
                                                         Minimum di Gedung Energy periode Juli - September
1034    11-Dec-23      MANDIRI IDR       1220011559559   (PKS Lampiran 1)                                             21,210,000   21,000,000    2,310,000       2,100,000        21,210,000
Page 171
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 57
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh        NET DIBAYARKAN
                                                         AWAN KILAT SEMESTA, PT , Tagihan Revenue Sharing
                                                         periode Oktober 2023 atas penjualan produk
1035    11-Dec-23      MANDIRI IDR       1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                  30,605,400   31,230,000          -          624,600        30,605,400

                                                         SCG BARITO LOGISTICS, PT , Biaya Pengiriman
1036    11-Dec-23      MANDIRI IDR       1220011559559   Material SFP Managed Switch dari Taiwan ke Jakarta         11,891,505   11,999,500      131,995        239,990        11,891,505

                                                         SCG BARITO LOGISTICS, PT , Biaya Pengiriman
1037    11-Dec-23      MANDIRI IDR       1220011559559   Material SFP Managed Switch dari Taiwan ke Jakarta         20,878,388   21,068,000      231,748        421,360        20,878,388

                                                         CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                         Material Cable ADSS 96 Core & OTB 96 Core dari WH
1038    11-Dec-23      MANDIRI IDR       1220011559559   Serpong ke PT Berkarya Bersama Jaya Teknologi                 495,500     500,000         5,500         10,000           495,500
                                                         CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                         Material Cable ADSS 48 Core dari PT Prysmian Cable
1039    11-Dec-23      MANDIRI IDR       1220011559559   ke WH Matraman                                                594,600     600,000         6,600         12,000           594,600
                                                         CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
                                                         Material Cable ADSS 24 Core dari PT CCSI ke WH
1040    11-Dec-23      MANDIRI IDR       1220011559559   Matraman                                                      743,250     750,000         8,250         15,000           743,250
                                                         AGUNG PERKASA RAYA, PT , Biaya Pengiriman
1041    11-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Cipulir                  495,500     500,000         5,500         10,000           495,500
                                                         AGUNG PERKASA RAYA, PT , Biaya Pengiriman
1042    11-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman                 495,500     500,000         5,500         10,000           495,500
                                                         AGUNG PERKASA RAYA, PT , Biaya Pengiriman
1043    11-Dec-23      MANDIRI IDR       1220011559559   Material dari WH Serpong ke WH Matraman                       495,500     500,000         5,500         10,000           495,500
                                                         AMANAT PERKASA SPEED, PT , Biaya Pengiriman
1044    11-Dec-23      MANDIRI IDR       1220011559559   Material Cable dari WH Serpong ke WH Matraman               1,035,500     950,000       104,500         19,000         1,035,500

                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Section
                                                         20 (2.562KM) Kedungbadak-008 - Tanah sareal-005,
                                                         Section 12 (1.780KM) Kencana-001 - Tanah Sareal-
                                                         005, Section 16 (1KM) Tanah Sareal-002 - Tanah
1045    12-Dec-23      MANDIRI IDR       1220011559559   Sareal-005, Section 17, 22 & 29 periode Nov 2023           11,240,135   10,312,050    1,134,326        206,241        11,240,135
                                                         MORA TELEMATIKA INDONESIA, PT , Sewa New Link
                                                         IDREN 100Mbps - NDC Jatinegara periode 07.06.2023 -
1046    12-Dec-23      MANDIRI IDR       1220011559559   06.07.2023                                                  9,810,000    9,000,000      990,000        180,000         9,810,000
                                                         MORA TELEMATIKA INDONESIA, PT , Sewa New Link
                                                         IDREN 100Mbps - NDC Jatinegara periode 07.07.2023 -
1047    12-Dec-23      MANDIRI IDR       1220011559559   06.08.2023                                                  9,810,000    9,000,000      990,000        180,000         9,810,000
                                                         MORA TELEMATIKA INDONESIA, PT , Sewa New Link
                                                         IDREN 100Mbps - NDC Jatinegara periode 07.08.2023 -
1048    12-Dec-23      MANDIRI IDR       1220011559559   06.09.2023                                                  9,810,000    9,000,000      990,000        180,000         9,810,000
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta BTS Perbatasa
                                                         Purwakarta - Subang (Via Garokgek), BTS Perapatan
                                                         Cihideung Jl. Raya Kapten Halim, BTS Tikungan Cihuni
                                                         Jl. Terusan Kapten Halim Lebakanyar periode Mei
1049    12-Dec-23      MANDIRI IDR       1220011559559   2023                                                        6,540,000    6,000,000      660,000        120,000         6,540,000
                                                         INDONESIA COMNETS PLUS, PT , Biaya Instalasi dan
                                                         Sewa Local Loop 5 Mbps Diskominfo Kab. Purwakarta
                                                         site BTS Perbatasan Purwakarta - Karawang periode
1050    12-Dec-23      MANDIRI IDR       1220011559559   24 - 31 Mei 2023                                           25,850,581   23,716,129    2,608,774        474,322        25,850,581
                                                         CYBERINDO ADITAMA, PT , Biaya Crossconnect FO
                                                         CBN Tenant PT Keb Hana Bank KCP Central Park Bulan
1051    12-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                    3,052,000    2,800,000      308,000         56,000         3,052,000
Page 172
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 58
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                         BANK          DPP             PPN             PPh          NET DIBAYARKAN
                                                         CYBERINDO ADITAMA, PT , Biaya Sewa Local Loop
                                                         100Mbps site Menara Jamsostek untuk Tenant PT
1052    12-Dec-23      MANDIRI IDR       1220011559559   Pamerindo Indonesia periode Nov 2023                         7,630,000    7,000,000        770,000        140,000           7,630,000
                                                         NTT INDONESIA, PT , Sewa Crossconnect Establish
                                                         NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1053    12-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                    14,715,000   13,500,000      1,485,000        270,000          14,715,000

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung Living World Bali
1054    13-Dec-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing September 2023                   17,665,114   15,914,517      1,750,597              -          17,665,114
                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung MSIG Berdasarkan
1055    13-Dec-23      MANDIRI IDR       1220011559559   Profit Sharing September 2023                               46,703,250   42,075,000      4,628,250              -          46,703,250

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung The Plaza Shopping
1056    13-Dec-23      MANDIRI IDR       1220011559559   Center Berdasarkan Profit Sharing September 2023            25,197,000   22,700,000      2,497,000              -          25,197,000
                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung Thamrin Nine
1057    13-Dec-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing September 2023                    9,046,500    8,150,000        896,500              -           9,046,500

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung The Plaza Office Tower
1058    13-Dec-23      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing September 2023                   65,955,865   59,419,698      6,536,167              -          65,955,865
                                                         FANAH JAYA MAINDO, PT , Pembelian Bracket Stop
1059    13-Dec-23      MANDIRI IDR       1220011559559   Link Sebanyak 200 Pcs untuk Keperluan di site                  151,404     136,400          15,004              -             151,404
                                                         FANAH JAYA MAINDO, PT , Pembelian Kain Majun
                                                         Perca Putih Bahan Katun Sebanyak 5Kg, Spray Acrylic
1060    13-Dec-23      MANDIRI IDR       1220011559559   400ml Red Sebanyak 6 Pcs,dll                                   965,367     869,700          95,667              -             965,367
                                                         SAMUDERA PELABUHAN INDONESIA, PT , Biaya atas
                                                         Pemakaian Listrik di Graha Samudera Periode Nov
1061    14-Dec-23        BCA IDR          3193058058     2023                                                           269,670     267,000          29,370         26,700             269,670
                                                         PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
1062    14-Dec-23        BCA IDR          3193058058     Pluit B/10 periode Nov 2023                                    485,926     485,926             -                -             485,926
                                                         PPPSRS CBD PLUIT , Biaya atas Pemakaian Listrik CBD
1063    14-Dec-23        BCA IDR          3193058058     Pluit LG-04 periode Nov 2023                                 1,434,317    1,434,317            -                -           1,434,317

                                                         GERAI LISTRIK PASAR MOBIL KEMAYORAN , Biaya
                                                         Tagihan Pascabayar untuk Site Gunung Sahari Utara-
                                                         008, Gunung Sahari Utara-009 dan Danau Sunter DII-
                                                         003 Periode December 2023 (Pemakaian November
1064    14-Dec-23        BCA IDR          3193058058     2023) Gerai Listrik Pasar Mobil Kemayoran                    5,043,833    5,146,768            -          102,935           5,043,833

                                                         MULIA INTIPELANGI, PT , Biaya atas Pemakaian Listrik
1065    14-Dec-23        BCA IDR          3193058058     Mall Taman Anggrek (GL-L5) Periode Nov 2023                  3,834,421    3,796,456        417,610        379,645           3,834,421
                                                         KRAKATAU SARANA PROPERTI, PT , Biaya atas
                                                         Pemakaian Listrik di Krakatau Steel Group periode Oct
1066    14-Dec-23      MANDIRI IDR       1220011559559   2023                                                            38,531         38,150        4,196          3,815              38,531
                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH RUSUN SPAZIO , Biaya Admin atas Pemakaian
                                                         Listrik di Rusun Spazio periode 21 Oct 2023 - 20 Nov
1067    14-Dec-23      MANDIRI IDR       1220011559559   2023                                                            13,085         13,352          -                267            13,085

                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH RUSUN SPAZIO , Biaya atas Pemakaian Listrik
1068    14-Dec-23      MANDIRI IDR       1220011559559   di Rusun Spazio periode 21 Oct 2023 - 20 Nov 2023              133,518     133,518             -                -             133,518
Page 173
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 59
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                         ISMAWA TRIMITRA, PT , Biaya atas Pemakaian Listrik
                                                         di Graha Iskandarsyah periode 20 Oct 2023 - 20 Nov
1069    14-Dec-23      MANDIRI IDR       1220011559559   2023                                                            165,163     163,527          17,988         16,352            165,163
                                                         SAINATH REALINDO, PT , Biaya atas Pemakaian Listrik
1070    14-Dec-23      MANDIRI IDR       1220011559559   di Gedung Sainath Tower periode Nov 2023                         80,750         89,722          -            8,972             80,750

                                                         MENARA PRAMBANAN, PT , Biaya atas Pemakaian
1071    14-Dec-23      MANDIRI IDR       1220011559559   Listrik di Apartement Poins Square periode Nov 2023             214,270     238,077             -           23,807            214,270
                                                         TERAS NIRWANA BALI, PT , Biaya atas Pemakaian
                                                         Listrik di The CEO Building Periode 20 Oct 2023 - 19
1072    14-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                        164,933     163,300          17,963         16,330            164,933

                                                         PERHIMPUNAN PENGHUNI GEDUNG PERKANTORAN
                                                         KIRANA TWO , Biaya atas Pemakaian Listrik di Gedung
1073    14-Dec-23      MANDIRI IDR       1220011559559   Kirana Two periode 21 Oct 2023 - 20 Nov 2023                    746,217     829,129             -           82,912            746,217
                                                         PERKUMPULAN PEMILIK PERKANTORAN GRAHA
                                                         SURVEYOR INDONESIA (PPPGSI) , Biaya atas
                                                         Pemakaian Listrik di Gedung Surveyor Lt.11 periode
1074    14-Dec-23      MANDIRI IDR       1220011559559   22 Oct 2023 - 22 Nov 2023                                       293,161     325,734             -           32,573            293,161
                                                         PERKUMPULAN PEMILIK PERKANTORAN GRAHA
                                                         SURVEYOR INDONESIA (PPPGSI) , Biaya atas
                                                         Pemakaian Listrik di Gedung Surveyor Lt.P2 periode
1075    14-Dec-23      MANDIRI IDR       1220011559559   22 Oct 2023 - 22 Nov 2023                                       299,509     332,787             -           33,278            299,509
                                                         INTILAND DEVELOPMENT TBK, PT (JAKARTA) , Biaya
                                                         atas Pemakaian Listrik di Gedung Intiland Jakarta
1076    14-Dec-23      MANDIRI IDR       1220011559559   periode 26 Sep 2023 - 25 Oct 2023                               597,742     591,823          65,101         59,182            597,742
                                                         TRANS INDONESIA SUPERKORIDOR, PT , Sewa
                                                         Intercity IDC Duren Tiga - RK0004 Office Gatot
1077    14-Dec-23      MANDIRI IDR       1220011559559   Subroto 500Mbps periode Nov 2023                              9,265,000    8,500,000        935,000        170,000          9,265,000
                                                         AGUNG PERKASA RAYA, PT , Biaya Pengiriman
                                                         Material Kabel ADSS 32 & 96 Core dari WH Serpong ke
1078    14-Dec-23      MANDIRI IDR       1220011559559   PT Santa Multi Semesta                                          495,500     500,000           5,500         10,000            495,500
                                                         TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                         Material Kabel ADSS 96 Core dari PT CCSI ke PT Aliansi
1079    14-Dec-23      MANDIRI IDR       1220011559559   Inovasi Global                                                1,580,500    1,450,000        159,500         29,000          1,580,500
                                                         TIRTA INDORAYA LOGISTICS, PT , Biaya Pengiriman
                                                         Material Kabel ADSS 32 & 96 Core dari PT CCSI ke PT
1080    14-Dec-23      MANDIRI IDR       1220011559559   Santa Multi Semesta                                           1,580,500    1,450,000        159,500         29,000          1,580,500
                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
1081    14-Dec-23      MANDIRI IDR       1220011559559   Jakarta - Bali 5 Gbps periode Nov 2023                       81,750,000   75,000,000      8,250,000       1,500,000        81,750,000
                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
1082    14-Dec-23      MANDIRI IDR       1220011559559   Jakarta - Bandung 500Mbps periode Nov 2023                    9,265,000    8,500,000        935,000        170,000          9,265,000
                                                         MEGA AKSES PERSADA, PT , Sewa Jabalink Purwakarta
1083    14-Dec-23      MANDIRI IDR       1220011559559   (Fiberstar) 100Mbps periode Nov 2023                          6,540,000    6,000,000        660,000        120,000          6,540,000

                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
                                                         3Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
1084    14-Dec-23      MANDIRI IDR       1220011559559   Surabaya Omadata Center periode Nov 2023                     32,700,000   30,000,000      3,300,000        600,000         32,700,000
                                                         BINTANG MAS UTAMA, CV , "Biaya Pembelian
                                                         Pengupas Kabel Fiber Optik, Grandway PON Power
                                                         Meter FHP2P01,dan Krisbow Tool Back Pack 40 Kg
1085    15-Dec-23      MANDIRI IDR       1220011559559   10115956 (PO Rp.8.419.350,- PPN Rp.834.350,-)                 8,419,350    7,585,000        834,350              -          8,419,350
                                                         MONETI INDO TEKNO, PT , Pembelian Cable Ties -
                                                         30cm Black Outdoor Sebanyak 500 Pcs, Lamp LED
1086    15-Dec-23      MANDIRI IDR       1220011559559   Floodlight 200W Warm White Sebanyak 10 Pcs                    5,494,500    4,950,000        544,500              -          5,494,500
Page 174
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 60
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                      NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK            DPP             PPN             PPh        NET DIBAYARKAN
                                                         MONETI INDO TEKNO, PT , Pembelian Pigtail SM
                                                         SC/APC 1M Sebanyak 50 Pcs, Adaptor Power Supply
                                                         AC to DC 5V 2A Sebanyak 100 Pcs, ODP 8 Port SC-UPC
1087    15-Dec-23      MANDIRI IDR       1220011559559   Sebanyak 10 Unit                                             4,495,500      4,050,000        445,500              -         4,495,500
                                                         MONETI INDO TEKNO, PT , Pembelian UHF Anti Metal -
                                                         Sticker RFID UHF Sebanyak 3 Pcs, UHF Sticker -
1088    15-Dec-23      MANDIRI IDR       1220011559559   Headlight Transparant Sebanyak 10 Pcs,dll                    2,787,210      2,511,000        276,210              -         2,787,210
                                                         MONETI INDO TEKNO, PT , Pembelian Kuas Roll Kapal
                                                         Supra 4 Inch Cat Tembok Minyak Sebanyak 6 Pcs,
                                                         Sarung Tangan Karet Palm Fit glove Mekanik Motor
1089    15-Dec-23      MANDIRI IDR       1220011559559   Sebanyak 5 Psg                                                 210,900        190,000         20,900              -           210,900
                                                         PLN PERSERO, PT , Biaya PLN Auto Debet Region Jawa
1090    15-Dec-23      MANDIRI IDR       1220011559559   Barat Periode Desember 2023                                 66,782,051     66,782,051            -                -        66,782,051
                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN
                                                         Pascabayar Region Jawa Tengah Periode Desember
1091    15-Dec-23      MANDIRI IDR       1220011559559   2023                                                       146,761,329    146,761,329            -                -       146,761,329
                                                         PLN PERSERO, PT , Biaya PLN Autodebet Jawa Timur
1092    15-Dec-23      MANDIRI IDR       1220011559559   Periode Desember 2023                                      190,886,830    190,886,830            -                -       190,886,830
                                                         BIBIT , Biaya Pekerjaan Replacement Pole Bali Moon
                                                         akibat kecelakakaan kendaraan berat (PO
1093    18-Dec-23      SINARMAS IDR       0002999994     Rp.1.400.287,- Potongan PPh 21(9%) Rp.126.026,-)             1,274,261      1,400,287            -          126,026         1,274,261
                                                         BALI PECATU GRAHA, PT , Biaya tagihan listrik dan IPL
                                                         BPG Bulan Desember 2023 (Pemakaian bulan
1094    18-Dec-23      SINARMAS IDR       0002999994     November 2023)                                              11,945,308     11,945,308            -                -        11,945,308
                                                         PLN PERSERO, PT , Pembelian Token PLN di 3 Site
                                                         KWH Prabayar site baru (Site Kerobokan
                                                         Kelod_025,Tumbak Bayuh_003,Tuban_010) periode
1095    18-Dec-23      SINARMAS IDR       0002999994     Pemakaian Bulan Desember 2023                                8,022,500      8,022,500            -                -         8,022,500

                                                         PLN PERSERO, PT , Biaya Tagihan Listrik PLN
1096    18-Dec-23      MANDIRI IDR       1220011559559   Pascabayar BTS Region Bali Periode Desember 2023         1,300,972,640   1,300,972,640           -                -      1,300,972,640

                                                         JAKARTA INTILAND, PT , Biaya atas Pemakaian Listrik
1097    18-Dec-23      MANDIRI IDR       1220011559559   di Ramayana Jatinegara Periode November 2023                   345,270        341,852         37,603         34,185           345,270

                                                         JAKARTA INTILAND, PT , Biaya atas Pemakaian Listrik
1098    18-Dec-23      MANDIRI IDR       1220011559559   di Ramayana Karawang Periode November 2023                     550,320        544,872         59,935         54,487           550,320
                                                         LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                         Summarecon Mal Serpong 1 periode 11 Oct 2023 - 10
1099    18-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                       785,016        777,243         85,497         77,724           785,016
                                                         LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                         Pemakaian Listrik di Summarecon Mal Serpong 1
1100    18-Dec-23      MANDIRI IDR       1220011559559   periode 11 Oct 2023 - 10 Nov 2023                              294,036        291,124         32,024         29,112           294,036
                                                         LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                         Summarecon Digital Centre (SDC) Serpong periode 11
1101    18-Dec-23      MANDIRI IDR       1220011559559   Oct 2023 - 10 Nov 2023                                         312,726        309,630         34,059         30,963           312,726
                                                         LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                         Pemakaian Listrik di Summarecon Digital Centre (SDC)
1102    18-Dec-23      MANDIRI IDR       1220011559559   Serpong periode 11 Oct 2023 - 10 Nov 2023                       86,281           85,426        9,397          8,542            86,281
                                                         LESTARI MAHADIBYA, PT , Biaya Pemakaian Listrik di
                                                         Summarecon Mal Serpong 2 periode 11 Oct 2023 - 10
1103    18-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                     1,024,829      1,014,682        111,615        101,468         1,024,829
                                                         LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                         Pemakaian Listrik di Summarecon Mal Serpong 2
1104    18-Dec-23      MANDIRI IDR       1220011559559   periode 11 Oct 2023 - 10 Nov 2023                              336,343        333,013         36,631         33,301           336,343
Page 175
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 61
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                      NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                       BANK            DPP             PPN             PPh         NET DIBAYARKAN
                                                         LESTARI MAHADIBYA, PT , Biaya atas Pemakaian
                                                         Listrik di Scientia Square Park (SQP) Serpong periode
1105    18-Dec-23      MANDIRI IDR       1220011559559   11 Oct 2023 - 10 Nov 2023                                       136,926        135,569         14,913         13,556            136,926
                                                         LESTARI MAHADIBYA, PT , Biaya Kehandalan atas
                                                         Pemakaian Listrik di Scientia Square Park (SQP)
1106    18-Dec-23      MANDIRI IDR       1220011559559   Serpong periode 11 Oct 2023 - 10 Nov 2023                        55,265           54,717        6,019           5,471            55,265
                                                         PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                         Pemakaian Listrik Landmark Pluit (GF-A) periode 16
1107    18-Dec-23      MANDIRI IDR       1220011559559   Oct 2023 - 15 Nov 2023                                          149,919        148,435         16,327         14,843            149,919
                                                         PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                         Pemakaian Listrik Landmark Pluit (GF-B) periode 16
1108    18-Dec-23      MANDIRI IDR       1220011559559   Oct 2023 - 15 Nov 2023                                          136,487        135,136         14,864         13,513            136,487
                                                         PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                         Pemakaian Listrik Landmark Pluit (GF-D) periode 16
1109    18-Dec-23      MANDIRI IDR       1220011559559   Oct 2023 - 15 Nov 2023                                          122,597        121,383         13,352         12,138            122,597
                                                         PENGELOLA LANDMARK PLUIT, PT , Biaya atas
                                                         Pemakaian Listrik Landmark Pluit (GF-E) periode 16
1110    18-Dec-23      MANDIRI IDR       1220011559559   Oct 2023 - 15 Nov 2023                                          158,620        157,049         17,275         15,704            158,620
                                                         SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                         Listrik di Plaza Senayan Arcadia Periode 27 Sep 2023 -
1111    18-Dec-23      MANDIRI IDR       1220011559559   27 Oct 2023                                                      89,648           88,760        9,764           8,876            89,648
                                                         SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                         Listrik di Plaza Senayan Periode 27 Sep 2023 - 27 Oct
1112    18-Dec-23      MANDIRI IDR       1220011559559   2023                                                            537,957        532,630         58,590         53,263            537,957
                                                         SENAYAN TRIKARYA SEMPANA, PT , Biaya Pemakaian
                                                         Listrik di Sentral Senayan I Periode 27 Sep 2023 - 27
1113    18-Dec-23      MANDIRI IDR       1220011559559   Oct 2023                                                         79,154           78,370        8,621           7,837            79,154
                                                         JELAJAH DATA SEMESTA, PT , Dedicated Internet
1114    18-Dec-23      MANDIRI IDR       1220011559559   Bandwidth 20 Gbps periode Nov 2023                          381,000,000    349,541,284     38,449,541       6,990,826       381,000,000
                                                         JELAJAH DATA SEMESTA, PT , Dedicated Internet
1115    18-Dec-23      MANDIRI IDR       1220011559559   Bandwidth 20gbps periode Dec 2023                           981,000,000    900,000,000     99,000,000      18,000,000       981,000,000
                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN Pasca
1116    18-Dec-23      MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode Desember 2023            2,521,086,903   2,521,086,903           -                -       2,521,086,903
                                                         AMAZANA KENCANA, PT , Biaya atas Pemakaian
1117    19-Dec-23      MANDIRI IDR       1220011559559   Listrik Apartemen Amazana Periode Nov 2023                      382,002        350,460         38,551           7,009           382,002
                                                         XL AXIATA TBK, PT , Biaya Tagihan Pasca Bayar
                                                         Pembelian Pulsa XL Mikrotik (Monitoring NOC)
                                                         Periode November 2023 (Pemakaian Oktober 2023-
1118    19-Dec-23      MANDIRI IDR       1220011559559   Jabodetabek Area (10 Site)                                    1,008,435        908,500         99,935              -          1,008,435
                                                         MITRAPERMATA INDAH, PT , Sewa Penempatan
                                                         Perangkat di Gedung Plaza Bank Index Tenant PT
                                                         Sequoia Daksa Hukum periode 15 Agust 2023 - 14 Mei
1119    19-Dec-23      MANDIRI IDR       1220011559559   2024                                                          4,113,225      4,072,500        447,975        407,250          4,113,225
                                                         MITRAPERMATA INDAH, PT , Sewa Penempatan
                                                         Perangkat di Gedung Plaza Bank Index Tenant PT
                                                         Higienis Indonesia periode 22 Agust 2023 - 14 Mei
1120    19-Dec-23      MANDIRI IDR       1220011559559   2024                                                          3,989,829      3,950,325        434,536        395,032          3,989,829

                                                         MITRAPERMATA INDAH, PT , Sewa Penempatan
                                                         Perangkat di Gedung Plaza Bank Index Tenant PT Bella
1121    19-Dec-23      MANDIRI IDR       1220011559559   Bello Logistic periode 28 Agust 2023 - 14 Mei 2024            3,898,424      3,859,825        424,581        385,982          3,898,424

                                                         MITRAPERMATA INDAH, PT , Sewa Penempatan
                                                         Perangkat di Gedung Plaza Bank Index Tenant PT Sinar
1122    19-Dec-23      MANDIRI IDR       1220011559559   Wijaya Industries periode 21 Jul 2023 - 14 Mei 2024           4,451,424      4,407,350        484,809        440,735          4,451,424
Page 176
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 62
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK          DPP             PPN             PPh        NET DIBAYARKAN
                                                         TELEKOMUNIKASI SELULAR, PT , Biaya Paket Data
                                                         Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                         Alarm periode Des 2023 area Jawa Tengah sebanyak 7
1123    19-Dec-23      MANDIRI IDR       1220011559559   MSISDN                                                        666,000     600,000          66,000              -           666,000
                                                         TELEKOMUNIKASI SELULAR, PT , Biaya Paket Data
                                                         Pascabayar Telkomsel Mikrotik untuk Monitoring
                                                         Alarm periode Des 2023 Jawa Tengah sebanyak 10
1124    19-Dec-23      MANDIRI IDR       1220011559559   MSISDN                                                      1,054,500     950,000         104,500              -         1,054,500
                                                         TELKOM INDONESIA, PT , Biaya Paket Broadband
                                                         Indihome for Monitoring (CSR) CCTV, FO Not Ready
1125    19-Dec-23      MANDIRI IDR       1220011559559   area Yogyakarta periode Des 2023                            1,265,400    1,140,000        125,400              -         1,265,400
                                                         PLN PERSERO, PT , Biaya Pembelian token Listrik KWH
                                                         PLN site MP-Ragunan-001 impact pergantian KWH
1126    19-Dec-23      MANDIRI IDR       1220011559559   normalisasi                                                 1,003,500    1,003,500            -                -         1,003,500

                                                         PLN PERSERO, PT , Biaya Biaya Pembelian Token KWH
1127    19-Dec-23      MANDIRI IDR       1220011559559   Listrik Site Cihampelas - Skywalk 2 & Pasar gedebage           43,500         43,500          -                -            43,500

                                                         TOKOPEDIA, PT , Biaya Pembelian Lan Tester Wire
                                                         Tracker Kabel Jaringan Network Finder RJ45 RJ11
                                                         Pouch & Mesin Bosch Bor Bobok Beton SDS 2-28 D
                                                         Rotary Hammer dan 1 Mata Bor Untuk Keperluan
1128    19-Dec-23      MANDIRI IDR       1220011559559   Installasi Tim Corporate Building & In House Project        1,759,300    1,759,300            -                -         1,759,300
                                                         TOKOPEDIA, PT , Biaya Pembelian Adaptor CCTV
                                                         1A/12V , untuk power CCTV untuk site 817947 Gatot
1129    19-Dec-23      MANDIRI IDR       1220011559559   Subroto Depan TSM                                             130,000     130,000             -                -           130,000
                                                         TOKOPEDIA, PT , Biaya pembelian passive spliter
                                                         Untuk Keperluan Instalasi IKR di SMT Serpong Mas
1130    19-Dec-23      MANDIRI IDR       1220011559559   Telematika                                                    324,000     324,000             -                -           324,000
                                                         TELEKOMUNIKASI SELULAR, PT , Biaya Top Up Paket
                                                         Data Mikrotik site Sriwijaya MP, Kejaksan-003, & MP
1131    19-Dec-23      MANDIRI IDR       1220011559559   Karyamulya 04                                                 205,000     205,000             -                -           205,000
                                                         RAJAWALI ADIWISMA, PT , Biaya atas Pemakaian
1132    20-Dec-23      MANDIRI IDR       1220011559559   Listrik di Menara Rajawali Periode Nov 2023                   194,859     192,930          21,222         19,293           194,859
                                                         AMAZANA KENCANA, PT , Tagihan Revenue Sharing
                                                         Bali Fiber di Apartement Amazana Periode Juli -
1133    20-Dec-23      MANDIRI IDR       1220011559559   September 2023                                              5,320,972    4,881,625        536,979         97,632         5,320,972
                                                         PURIAMPERA INTIPRATAMA, PT , Biaya atas
                                                         Pemakaian Listrik di Gedung Ad Premier Periode Nov
1134    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                          251,125     248,638          27,350         24,863           251,125
                                                         SUMMARECON AGUNG, PT , Biaya atas Pemakaian
1135    20-Dec-23      MANDIRI IDR       1220011559559   Listrik di The Kensington periode Nov 2023                    131,487     130,185          14,320         13,018           131,487
                                                         SUMMARECON AGUNG, PT , Biaya atas Pemakaian
                                                         Listrik di The Springlake Apartement periode Nov
1136    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                          529,294     524,053          57,646         52,405           529,294
                                                         MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                         Pemakaian Listrik di Gedung Sentra Summarecon
                                                         Bekasi Ruang Panel BZ2 periode 13 Oct 2023 - 12 Nov
1137    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                          159,499     157,920          17,371         15,792           159,499
                                                         MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                         di Gedung Sentra Summarecon Bekasi Ruang Panel
1138    20-Dec-23      MANDIRI IDR       1220011559559   BZ2 periode 13 Oct 2023 - 12 Nov 2023                         461,755     457,183          50,290         45,718           461,755
                                                         MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                         Pemakaian Listrik di Gedung Sentra Summarecon
                                                         Bekasi Ruang Panel BZ3 periode 13 Oct 2023 - 12 Nov
1139    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                          177,316     175,560          19,312         17,556           177,316
Page 177
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 63
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP             PPN             PPh        NET DIBAYARKAN
                                                         MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                         di Gedung Sentra Summarecon Bekasi Ruang Panel
1140    20-Dec-23      MANDIRI IDR       1220011559559   BZ3 periode 13 Oct 2023 - 12 Nov 2023                           562,414     556,845          61,253         55,684           562,414
                                                         MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                         Pemakaian Listrik di Gedung Sentra Summarecon
                                                         Bekasi Ruang Panel 1 Zona 1 13 Oct 2023 - 12 Nov
1141    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                            133,943     132,616          14,588         13,261           133,943

                                                         MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                         di Gedung Sentra Summarecon Bekasi Ruang Panel 1
1142    20-Dec-23      MANDIRI IDR       1220011559559   Zona 1 periode 13 Oct 2023 - 12 Nov 2023                        317,364     314,222          34,564         31,422           317,364

                                                         MAKMUR ORIENT JAYA, PT , Biaya Kehandalan Atas
                                                         Pemakaian Listrik di Gedung Sentra Summarecon
1143    20-Dec-23      MANDIRI IDR       1220011559559   Bekasi Parkir DTW periode 13 Oct 2023 - 12 Nov 2023              83,904         83,073        9,138          8,307            83,904
                                                         MAKMUR ORIENT JAYA, PT , Biaya Pemakaian Listrik
                                                         di Gedung Sentra Summarecon Bekasi Parkir DTW
1144    20-Dec-23      MANDIRI IDR       1220011559559   periode 13 Oct 2023 - 12 Nov 2023                                34,655         34,312        3,774          3,431            34,655
                                                         KHARISMA INTAN PROPERTI, PT , Biaya atas
                                                         Pemakaian Listrik di Scientia Business Park periode
1145    20-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                        184,023     182,201          20,042         18,220           184,023
                                                         DUNIA MAKMUR PROPERTI, PT , Biaya atas
                                                         Pemakaian Listrik di Plaza Summarecon Bekasi
1146    20-Dec-23      MANDIRI IDR       1220011559559   Periode Nov 2023                                                782,987     775,234          85,276         77,523           782,987
                                                         BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                         Pemakaian Listrik di ITC Cipulir Mas Lt. Dasar - LT. 4
1147    20-Dec-23      MANDIRI IDR       1220011559559   periode 18 Oct 2022 - 17 Nov 2023                             1,173,081    1,303,423            -          130,342         1,173,081
                                                         GRAHANIAGA TATAUTAMA, PT , Biaya atas
                                                         pemakaian Listrik di Gedung Graha Niaga Tatautama
1148    20-Dec-23      MANDIRI IDR       1220011559559   Periode 21/10/2023 - 20/11/2023                                 232,658     230,354          25,339         23,035           232,658
                                                         MULIA CEMERLANG DIAN PERSADA, PT , Biaya atas
1149    20-Dec-23      MANDIRI IDR       1220011559559   Pemakaian Listrik di Wisma GKBI periode Nov 2023                571,098     565,443          62,199         56,544           571,098
                                                         NICO CENTRAL, PT , Biaya atas Pemakaian Listrik di
1150    20-Dec-23      MANDIRI IDR       1220011559559   Gedung Sona Topas Tower Periode Nov 2023                        373,447     369,750          40,672         36,975           373,447
                                                         PENGELOLA PUSAT BELANJA, PT , Biaya atas
                                                         Pemakaian Listrik di Mall Bassura periode 16 Oct 2023
1151    20-Dec-23      MANDIRI IDR       1220011559559   - 15 Nov 2023                                                   849,975     841,558          92,572         84,155           849,975
                                                         BUMI MULIA PERKASA DEVELOPMENT, PT , Biaya atas
                                                         Pemakaian Listrik di Gedung Atrium Mulia periode
1152    20-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                        232,423     230,122          25,313         23,012           232,423

                                                         TRI PURA INDAH PERSADA, PT , Biaya atas Pemakaian
1153    20-Dec-23      MANDIRI IDR       1220011559559   Listrik Gd. Wirausaha Kuningan Periode Nov 2023                 279,530     276,762          30,444         27,676           279,530
                                                         WIJAYA KARYA REALTY, PT , Biaya atas Pemakaian
                                                         Listrik di Gedung Tamansari Parama Periode 01 Nov
1154    20-Dec-23      MANDIRI IDR       1220011559559   2023 - 30 Nov 2023                                            1,206,697    1,231,323            -           24,626         1,206,697
                                                         SUGIH BERKAT, PT , Biaya atas Pemakaian Listrik di
                                                         Gedung Menara Citicon periode 27 Oct 2023 - 27 Nov
1155    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                            707,000     700,000          77,000         70,000           707,000
                                                         MEGA PLAZA, PT , Biaya atas Pemakaian Listrik di
1156    20-Dec-23      MANDIRI IDR       1220011559559   Gedung Mega Plaza periode Oct 2023                              150,512     149,022          16,392         14,902           150,512
                                                         INDOKARYA SUKSES BERSAMA, PT , Biaya atas
                                                         Pemakaian Listrik di Apartemen Pluit Sea View
1157    20-Dec-23      MANDIRI IDR       1220011559559   Periode 25 Oct 2023 - 23 Nov 2023                               644,661     716,289             -           71,628           644,661
                                                         SERPONG MAS TELEMATIKA, PT , Biaya Sewa Core FO
                                                         2 core HH Pos Polisi - German Center periode Okt
1158    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                          1,635,000    1,500,000        165,000         30,000         1,635,000
Page 178
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 64
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                         P3SRS SEMENTARA MEGA GLODOK KEMAYORAN ,
                                                         Biaya atas Pemakaian Listrik di MGK Kemayoran
1159    20-Dec-23      MANDIRI IDR       1220011559559   periode 20 Oct 2023 - 20 Nov 2023                              140,838      140,838           -                -            140,838
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1160    20-Dec-23      MANDIRI IDR       1220011559559   Phase 12 Jabotabek Periode Desember 2023                   230,246,000   230,246,000          -                -        230,246,000
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1161    20-Dec-23      MANDIRI IDR       1220011559559   Phase 12 Jawa Tengah Periode Desember 2023                 110,192,500   110,192,500          -                -        110,192,500
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1162    20-Dec-23      MANDIRI IDR       1220011559559   Phase 12 Jawa Barat Periode Desember 2023                   44,615,500    44,615,500          -                -         44,615,500

                                                         PRM PEMBANGUNAN PERUMAHAN NASIONAL , Sewa
                                                         Penempatan Perangkat di Gedung Rusun Pulo Gebang
1163    20-Dec-23      MANDIRI IDR       1220011559559   Seruni periode 16 Sept 2023 - 15 Sept 2025                  10,226,371    10,125,120    1,113,763       1,012,512        10,226,371
                                                         WAHANA KARYA HUTAMA, PT , Sewa Penempatan
                                                         Perangkat di Gedung Pengelola Komplek Simprug
1164    20-Dec-23      MANDIRI IDR       1220011559559   Gallery periode 04 Des 2023 - 03 Des 2024                    6,060,000     6,000,000      660,000        600,000          6,060,000
                                                         ASIA TEKNOLOGI SOLUSI, PT , Sewa Local Loop 50
                                                         Mbps untuk Kebutuhan PT Seven Morning site PIK to
1165    20-Dec-23      MANDIRI IDR       1220011559559   Cyber 1 Metro - E Local Loop periode Nov 2023                3,270,000     3,000,000      330,000         60,000          3,270,000
                                                         SMARTFREN TELECOM TBK, PT , Internet Bandwidth
1166    20-Dec-23      MANDIRI IDR       1220011559559   2site @50mbps (I : 8000001214)                               7,820,129     7,045,161      774,968              -          7,820,129
                                                         MARKETING COMMUNICATION , Uang Muka Beban
                                                         Umum atas Biaya Open Booth di Rusun Tanah Abang
                                                         Blok A periode 15 Desember 2023 - 15 Januari 2024 -
1167    20-Dec-23      MANDIRI IDR       1220011559559   Trf                                                            500,000      500,000           -                -            500,000
                                                         BANGUNMUSTIKA INTIPERSADA, PT , Tagihan Sewa &
                                                         Service Charge Kantor Call Center & Acces Point Lt. 4
1168    20-Dec-23      MANDIRI IDR       1220011559559   Cipulir periode Jan - Mar 2024                             202,925,160   200,916,000   22,100,760      20,091,600       202,925,160
                                                         BINAJASA SUMBER SARANA, PT , Reimbursement
1169    20-Dec-23      MANDIRI IDR       1220011559559   Salary Outsource All Dept periode Nov 2023                 227,848,286   226,339,356    1,844,247        335,317        227,848,286
                                                         BINAJASA SUMBER SARANA, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales periode Nov 2023,
1170    20-Dec-23      MANDIRI IDR       1220011559559   Insentif periode Okt 2023                                  150,233,400   149,238,477    1,216,017        221,094        150,233,400
                                                         INFRA YES SOLUSINDO, PT , Biaya Management Fee
                                                         atas Revenue Sharing periode Oktober 2023 di
1171    20-Dec-23      MANDIRI IDR       1220011559559   Apartement Green Pramuka                                    35,205,357    35,923,833          -          718,476         35,205,357
                                                         SUKA DUKA GIRI HILL , Biaya Management Fee atas
                                                         Revenue Sharing periode Oktober 2023 di Suka Duka
1172    20-Dec-23      MANDIRI IDR       1220011559559   Raya Hill - Perumahan Giri Hill                              2,469,611     2,572,511          -          102,900          2,469,611

                                                         PERHIMPUNAN PENGHUNI WISMA GADING PERMAI ,
                                                         Tagihan Revenue Sharing periode Juli - September
1173    20-Dec-23      MANDIRI IDR       1220011559559   2023 di Apartemen Wisma Gading Permai                        4,498,452     4,998,279          -          499,827          4,498,452
                                                         GRIYA MURIA KENCANA, PT , Tagihan Revenue
                                                         Sharing periode Oktober 2023 atas Penempatan
1174    20-Dec-23      MANDIRI IDR       1220011559559   Perangkat Telekomunikasi di Gedung Prince Center               737,300      730,000        80,300         73,000            737,300
                                                         CIRCLECOM NUSANTARA INDONESIA, PT , Biaya
                                                         Tagihan Revenue Sharing di Kawasan Kelapa Gading
                                                         Square (MOI) Berdasarkan Penggunaan Jaringan
                                                         Internet Residential & Corporate periode April - Juni
1175    20-Dec-23      MANDIRI IDR       1220011559559   2023                                                         1,226,250     1,125,000      123,750         22,500          1,226,250
                                                         TRIMITRA PUTRA MANDIRI, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales Periode Nov 2023
1176    20-Dec-23      MANDIRI IDR       1220011559559   dan Insentif Periode Okt 2023                              186,311,258   185,077,408    1,508,038        274,188        186,311,258
                                                         RAJAWALI ANUGRAH RESOURCES, PT ,
                                                         Reimbursement Salary Outsource Div. Direct Sales
1177    20-Dec-23      MANDIRI IDR       1220011559559   Periode Nov 2023 dan Insentif Periode Okt 2023             115,021,320   114,259,589      931,004        169,273        115,021,320
Page 179
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 65
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                         ALPHA CIPTA COMPUTINDO, PT , Pembelian Router
1178    21-Dec-23        BCA IDR          3193058058     RB922UAGS-5HPACD-NM Mikrotik Sebanyak 2 Unit                4,884,000    4,400,000      484,000              -          4,884,000
                                                         AREA KARANG ASEM , Biaya retribusi pengendalian
                                                         menara telekomunikasi kabupaten Karangasem Tahun
1179    21-Dec-23      SINARMAS IDR       0002999994     2023                                                       16,971,058   16,971,058          -                -         16,971,058
                                                         AREA BULELENG , Biaya retribusi pengendalian
                                                         menara telekomunikasi kabupaten Buleleng tahun
1180    21-Dec-23      SINARMAS IDR       0002999994     2023                                                       33,600,000   33,600,000          -                -         33,600,000
                                                         AREA TABANAN , Biaya retribusi pengendalian
                                                         menara telekomunikasi Kabupaten Tabanan Tahun
1181    21-Dec-23      SINARMAS IDR       0002999994     2023                                                       11,649,000   11,649,000          -                -         11,649,000
                                                         AREA JEMBRANA , Biaya retribusi pengendalian
                                                         menara telekomunikasi Kabupaten Jembrana tahun
1182    21-Dec-23      SINARMAS IDR       0002999994     2023                                                        9,741,600    9,741,600          -                -          9,741,600
                                                         AREA BADUNG , Biaya Sewa lahan Site 499513
                                                         Combat Tibubeneng_002 (Keempat) selama 1 Bulan
                                                         Periode 22 Desember 2023-21 Januari 2024 (PO
                                                         Rp.20.000.000,- Potongan PPh 4(2) 10% Rp.500.000,-
1183    21-Dec-23      SINARMAS IDR       0002999994     )                                                           4,500,000    4,500,000          -                -          4,500,000
                                                         PLN PERSERO, PT , Biaya pembelian Token PLN untuk
                                                         2 site KWH Prabayar Periode Pemakaian bulan
                                                         Desember 2023 (Site Jimbaran_019 dan Site
1184    21-Dec-23      SINARMAS IDR       0002999994     Jimbaran_029)                                               7,020,000    7,020,000          -                -          7,020,000

                                                         DITJEN POSTEL , BHP Frekuensi Radio Periode 24 Des
1185    21-Dec-23      MANDIRI IDR       1220011559559   2023 - 23 Des 2024 No. Aplikasi : 02935692112023           10,224,720   10,224,720          -                -         10,224,720

                                                         DITJEN POSTEL , BHP Frekuensi Radio Periode 24 Des
1186    21-Dec-23      MANDIRI IDR       1220011559559   2023 - 23 Des 2024 No. Aplikasi : 02935691112023           10,224,720   10,224,720          -                -         10,224,720
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Section
                                                         25 3.965KM Pasirjaya-001 - Paledang-001 periode Des
1187    21-Dec-23      MANDIRI IDR       1220011559559   2023                                                        3,025,295    2,775,500      305,305         55,510          3,025,295
                                                         MENARA PRAMBANAN, PT , Tagihan Sharing Revenue
                                                         Bali Fiber di Apartement Poins Square periode Juli -
1188    21-Dec-23      MANDIRI IDR       1220011559559   September 2023                                              2,052,032    2,031,714      223,489        203,171          2,052,032
                                                         ADHI PERSADA PROPERTY, PT , Tagihan Revenue
                                                         Sharing Bali Fiber di Apartement Grand Dhika City
1189    21-Dec-23      MANDIRI IDR       1220011559559   Periode Juli - September 2023                                 542,956     498,124        54,794          9,962            542,956
                                                         CIRCLECOM NUSANTARA INDONESIA, PT , Biaya
                                                         Tagihan Revenue Sharing di Kawasan Kelapa Gading
                                                         Square (MOI) Berdasarkan Penggunaan Jaringan
                                                         Internet Residential & Corporate periode Januari -
1190    21-Dec-23      MANDIRI IDR       1220011559559   Maret 2023                                                  1,430,625    1,312,500      144,375         26,250          1,430,625

                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH SUSUN APARTEMENT THE ELEMENTS , Biaya
                                                         Management Fee atas Revenue Sharing periode Juli -
1191    21-Dec-23      MANDIRI IDR       1220011559559   September 2023 di Apartemen The Element                    16,505,090   16,841,928          -          336,838         16,505,090
                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                         KONDOMINIUM TAMAN ANGGREK , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Mall &
                                                         Kondominium Taman Anggrek Berdasarkan Profit
1192    21-Dec-23      MANDIRI IDR       1220011559559   Sharing Periode November 2023                              11,013,050   12,236,722          -         1,223,672        11,013,050
                                                         WIJAYA KARYA REALTY, PT , Tagihan Revenue Sharing
                                                         di Gedung Tamansari Parama Boutique Office periode
1193    21-Dec-23      MANDIRI IDR       1220011559559   Juli - September 2023                                       1,128,150    1,035,000      113,850         20,700          1,128,150
Page 180
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 66
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                         INFRA YES SOLUSINDO, PT , Biaya Management Fee
                                                         atas Revenue Sharing periode November 2023 di
1194    21-Dec-23      MANDIRI IDR       1220011559559   Apartement Green Pramuka                                    36,235,857   36,975,364          -          739,507         36,235,857
                                                         MEDIA SOLUSI NETWORK, PT , Sewa Link Metro-E 50
                                                         Mbps - PT Media Solusi Network 7 site Bapenda Kota
1195    21-Dec-23      MANDIRI IDR       1220011559559   Bandung periode Okt 2023                                     7,630,000    7,000,000      770,000        140,000          7,630,000
                                                         MEDIA SOLUSI NETWORK, PT , Sewa Link Metro-E 50
                                                         Mbps - PT Media Solusi Network 7 site Bapenda Kota
1196    21-Dec-23      MANDIRI IDR       1220011559559   Bandung periode Nov 2023                                     7,630,000    7,000,000      770,000        140,000          7,630,000
                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH SUSUN KLENDER , Sewa Penempatan
                                                         Perangkat di Gedung Rumah Susun Klender periode
1197    21-Dec-23      MANDIRI IDR       1220011559559   30 Jan 2024 - 29 Jan 2025                                   25,000,001   27,777,778          -         2,777,777        25,000,001
                                                         PETARUNG TANGGUH PERSADA, PT , Sewa
                                                         Penempatan Perangkat di Gedung Mal Bali Galeria
1198    21-Dec-23      MANDIRI IDR       1220011559559   periode 24 Agust 2023 - 23 Agust 2024                       20,200,000   20,000,000    2,200,000       2,000,000        20,200,000
                                                         MOXCAL TEKNOLOGI, PT , Jasa Whatsapp Service API
1199    21-Dec-23      MANDIRI IDR       1220011559559   Client periode 15 Nov 2023 - 14 Des 2023                       654,000     600,000        66,000         12,000            654,000
                                                         ASOSIASI PENYELENGGARA JASA INTERNET
                                                         INDONESIA , Biaya Penempatan Rak (S2) di APJII
1200    21-Dec-23      MANDIRI IDR       1220011559559   Periode Des 2023                                            10,900,000   10,000,000    1,100,000        200,000         10,900,000
                                                         PUALAM KENCANA GEMILANG JAKARTA, PT , Biaya
                                                         atas Pemakaian Listrik di Gedung Perwata Tower
1201    21-Dec-23      MANDIRI IDR       1220011559559   periode 26 Oct 2023 - 25 Nov 2023                              607,573     601,557        66,171         60,155            607,573
                                                         DONNELLY PARAMITA UTAMA, PT , Biaya atas
                                                         Pemakaian Listrik di Gedung Transavia Land/Graha
1202    21-Dec-23      MANDIRI IDR       1220011559559   Paramita periode Nov 2023                                      305,498     302,473        33,272         30,247            305,498
                                                         BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                         Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                         4/B.071 (Call Center) Periode18 Oct 2023 - 17 Nov
1203    21-Dec-23      MANDIRI IDR       1220011559559   2023                                                        12,783,709   14,204,121          -         1,420,412        12,783,709
                                                         BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                         Pemakaian Listrik di ITC Cipulir Mas Lt 4/F.035 (IKR)
1204    21-Dec-23      MANDIRI IDR       1220011559559   Periode 18 Oct 2023 - 17 Nov 2023                            2,939,794    3,266,437          -          326,643          2,939,794
                                                         BINTANG SEMPURNA, PT , Pembelian Poster dan
                                                         Spanduk Balifiber Instant Wifi Sebanyak 1.000 Pcs,
                                                         Poster dan Spanduk Balifiber Instant Wifi Sebanyak 10
1205    21-Dec-23      MANDIRI IDR       1220011559559   Pcs                                                          5,014,000    4,600,000      506,000         92,000          5,014,000
                                                         BINTANG SEMPURNA, PT , Pembelian Flyer Khusus
                                                         Green Pramuka City untuk Open Booth Periode
1206    21-Dec-23      MANDIRI IDR       1220011559559   November Sebanyak 2 RIM                                      3,324,500    3,050,000      335,500         61,000          3,324,500
                                                         BINTANG MAS UTAMA, CV , Pembelian Kabel Ties
                                                         20cm Hitam Sebanyak 4 Pak, Lampu Philips 14.5 Watt
1207    21-Dec-23      MANDIRI IDR       1220011559559   Warm White Kuning Sebanyak 9 Pcs                               634,920     572,000        62,920              -            634,920

                                                         GRAHA LESTARI INTERNUSA, PT , Tagihan Revenue
                                                         Sharing 30% Jasa Koneksi Internet Wework di Gedung
1208    21-Dec-23      MANDIRI IDR       1220011559559   Noble House periode Juli - September 2023                   51,908,788   51,394,839    5,653,432       5,139,483        51,908,788
                                                         PPPSRS PERKANTORAN EKSEKUTIF SATRIO TOWER ,
                                                         Biaya atas Pemakaian Listrik di Gedung Satrio Tower
1209    21-Dec-23      MANDIRI IDR       1220011559559   periode Nov 2023                                               219,281     217,110        23,882         21,711            219,281
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber 4core
                                                         segmen Mall Karawang - Karawang Regency periode
1210    21-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                     9,679,200    8,880,000      976,800        177,600          9,679,200

                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
1211    21-Dec-23      MANDIRI IDR       1220011559559   Bondongan-002 - Sukasari (POI XL) periode Sept 2023          4,720,245    4,330,500      476,355         86,610          4,720,245
Page 181
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 67
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                    NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP             PPN             PPh         NET DIBAYARKAN
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
1212    21-Dec-23      MANDIRI IDR       1220011559559   Bondongan-002 - Paledang-001 periode Sept 2023               4,638,495     4,255,500       468,105         85,110          4,638,495
                                                         INDOSAT TBK, PT , Biaya Sewa Domestic Ethernet Link
                                                         (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6 Jakarta
1213    21-Dec-23      MANDIRI IDR       1220011559559   periode Nov 2023                                           114,460,000   105,010,000    11,550,000       2,100,000       114,460,000
                                                         MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                         Pemakaian Listrik Gedung Palma Tower lt. B.1 periode
1214    21-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                       103,048      102,027         11,223         10,202            103,048
                                                         MENARA CAPITAL INDONUSA, PT , Biaya atas
                                                         Pemakaian Listrik Gedung Palma Tower lt. 11 periode
1215    21-Dec-23      MANDIRI IDR       1220011559559   Nov 2023                                                       103,048      102,027         11,223         10,202            103,048
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
                                                         Bondongan-002 - Sukasari (POI XL) periode Agust
1216    21-Dec-23      MANDIRI IDR       1220011559559   2023                                                         4,567,979     4,190,806       460,989         83,816          4,567,979
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
1217    21-Dec-23      MANDIRI IDR       1220011559559   Bondongan-002 - Paledang-001 periode Agust 2023              4,488,867     4,118,226       453,005         82,364          4,488,867

                                                         POWER TELECOM, PT , Sewa Dark Fiber Segmen 11
                                                         (2.037KM) dan (2.038KM) Tegal Gundil-010 - Tanah
                                                         Sareal-005, Section 10 (2.830KM) & (2.831KM)
                                                         Narasoma - Tanah Sareal-005, Section 26 (2.270KM)
1218    21-Dec-23      MANDIRI IDR       1220011559559   Cikaret-001 - Pasirjaya-001 periode Des 2023                 5,446,294     4,996,600       549,626         99,932          5,446,294

                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Section
                                                         20 (2.562KM) Kedungbadak-008 - Tanah sareal-005,
                                                         Section 12 (1.780KM) Kencana-001 - Tanah Sareal-
                                                         005, Section 16 (1KM) Tanah Sareal-002 - Tanah
1219    21-Dec-23      MANDIRI IDR       1220011559559   Sareal-005, Section 17, 22 & 29 periode Des 2023            11,224,750    10,297,935     1,132,773        205,958         11,224,750
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
1220    21-Dec-23      MANDIRI IDR       1220011559559   Bondongan-002 - Paledang-001 periode Des 2023                4,638,495     4,255,500       468,105         85,110          4,638,495

                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber Site
1221    21-Dec-23      MANDIRI IDR       1220011559559   Bondongan-002 - Sukasari (POI XL) periode Des 2023           4,720,245     4,330,500       476,355         86,610          4,720,245
                                                         SARANA UTAMA ADIMANDIRI, PT , Sewa Penempatan
                                                         Perangkat di Gedung Plaza Sua periode 03 Des 2023 -
1222    21-Dec-23      MANDIRI IDR       1220011559559   02 Des 2024                                                 12,120,000    12,000,000     1,320,000       1,200,000        12,120,000
                                                         SENAYAN TRIKARYA SEMPANA, PT , Biaya
                                                         Penempatan Sewa Perangkat Telekomunikasi
                                                         berdasarkan Revenue Sharing periode Juli -
1223    21-Dec-23      MANDIRI IDR       1220011559559   September 2023 di Gedung Sentral Senayan I                     431,775      427,500         47,025         42,750            431,775
                                                         PPPSRSS SAHID SUDIRMAN CENTER , Tagihan
                                                         Revenue Sharing Bali Fiber di Sahid Sudirman Center
1224    21-Dec-23      MANDIRI IDR       1220011559559   periode 01 Juli 2023 - 30 September 2023                    33,339,691    33,009,595     3,631,055       3,300,959        33,339,691

                                                         QONTAK TUMBUH MAKMUR, PT , Uang Muka Beban
                                                         Umum atas Biaya Top Up WhatsApp Conversation
1225    21-Dec-23      MANDIRI IDR       1220011559559   Credit (Prepaid) - Desember 2023 - Trf                       7,630,000     7,630,000           -                -          7,630,000
                                                         TELEKOMUNIKASI SELULAR, PT , Biaya Pascabayar
                                                         Paket Data Mikrotik Regional Jawa Timur Periode Des
1226    22-Dec-23        BCA IDR          3193058058     2023                                                           582,750      525,000         57,750              -            582,750
                                                         ARELION SINGAPORE Pte Ltd. , Biaya Sewa Telia IP
1227    22-Dec-23     SINARMAS USD        0000670707     Transit 3Gbps Periode Nov 2023                              37,183,200    37,183,200           -                -         37,183,200
                                                         CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                         Pemakaian Listrik di Gedung Green Sedayu Mall
1228    22-Dec-23      MANDIRI IDR       1220011559559   General 1 BSM periode Nov 2023                                  98,580         90,440        9,948          1,808             98,580
Page 182
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 68
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                         CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                         Pemakaian Listrik di Gedung Green Sedayu Mall
1229    22-Dec-23      MANDIRI IDR       1220011559559   General 2 Lt.GF periode Nov 2023                              498,250      457,110        50,282          9,142            498,250
                                                         CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                         Pemakaian Listrik di Gedung Green Sedayu Mall
1230    22-Dec-23      MANDIRI IDR       1220011559559   General 4 Lt.2 periode Nov 2023                               263,912      242,121        26,633          4,842            263,912
                                                         CITRA KIRANA HIJAU RETAIL, PT , Biaya atas
                                                         Pemakaian Listrik di Gedung Green Sedayu Mall
1231    22-Dec-23      MANDIRI IDR       1220011559559   General 3 Lt.1 periode Nov 2023                               407,847      374,172        41,158          7,483            407,847
                                                         PPPSRS APRON KEMAYORAN , Sewa Penempatan
                                                         Perangkat di Gedung Perhimpunan Penghuni Rumah
                                                         Susun Apron Kemayoran periode 28 Feb 2023 - 27 Feb
1232    22-Dec-23      MANDIRI IDR       1220011559559   2026                                                       30,000,000    33,333,333          -         3,333,333        30,000,000
                                                         DANAMAS INSAN KREASI ANDALAN, PT ,
                                                         Reimbursement Salary Outsource Div. Direct Sales
1233    22-Dec-23      MANDIRI IDR       1220011559559   periode Nov 2023, Insentif periode Okt 2023               223,250,501   221,772,021    1,807,031        328,551        223,250,501
                                                         I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                         perpanjangan perjanjian sewa lahan site 09
                                                         Darmasaba(PO Rp.3.076.923,- Potongan PPh 21(2.5%)
1234    27-Dec-23      SINARMAS IDR       0002999994     Rp.76.923,-)                                                3,000,000     3,076,923          -           76,923          3,000,000
                                                         I WAYAN SELAMET, SH , Biaya penyusunan akta
                                                         perjanjian sewa lahan site 750078 Padangsambian-
                                                         001 (PO Rp.1.025.641,- Potongan PPh 21(2.5%)
1235    27-Dec-23      SINARMAS IDR       0002999994     Rp.25.641,-)                                                1,000,000     1,025,641          -           25,641          1,000,000
                                                         AREA BADUNG , Pembayaran Bulan (Kelima) Biaya
                                                         Perpanjangan Sewa Lahan - Site 499512 Combat
                                                         Tibubeneng-001 Periode Tanggal 28 Des 2023 - 27 Jan
                                                         2024 (PO Rp.15.000.000,- Potongan PPh 4(2)
1236    27-Dec-23      SINARMAS IDR       0002999994     Rp.500.000,- )                                              4,500,000     4,500,000          -                -          4,500,000
                                                         PLN PERSERO, PT , Token Pulsa Listrik Site Combat
1237    27-Dec-23      SINARMAS IDR       0002999994     Tibubeneng_003 dan Biaya Admin Rp.2.500,-                   1,002,500     1,002,500          -                -          1,002,500

                                                         AREA BADUNG , Biaya Perpanjangan Sewa lahan Site
                                                         499507 Combat Pecatu_001 selama 2 bulan (Periode
                                                         28 November 2023-27 Januari 2023) (PO
1238    27-Dec-23      SINARMAS IDR       0002999994     Rp.5.555.555,- Potongan PPh 4(2) 10 % Rp.555.555,- )        5,000,000     5,000,000          -                -          5,000,000
                                                         PLN PERSERO, PT , Biaya pembelian Token PLN untuk
                                                         30 site KWH prabayar periode pemakaian Januari
1239    29-Dec-23      SINARMAS IDR       0002999994     2024                                                       50,875,000    50,875,000          -                -         50,875,000
                                                         PLN PERSERO, PT , Biaya pembelian token PLN kwh
                                                         prabayar site baru 211246 Ungasan-009 bulan
1240    29-Dec-23      SINARMAS IDR       0002999994     Desember 2023                                               3,510,000     3,510,000          -                -          3,510,000
                                                         MEGA AKSES PERSADA, PT , Sewa Jabalink IPLC
                                                         Jakarta - Singapore (Fiberstar) 30 Gbps Periode Nov
1241    29-Dec-23      MANDIRI IDR       1220011559559   2023                                                      324,669,002   297,861,470   32,764,761       5,957,229       324,669,002
                                                         MDT TOTAL SOLUTION, PT , Pembelian Joint Closure
                                                         24 Core Sebanyak 40 Unit, Joint Closure 48 Core
1242     2-Jan-24      MANDIRI IDR       1220011559559   Sebanyak 40 Unit                                           25,308,000    22,800,000    2,508,000              -         25,308,000
                                                         TELCO ABADI JAYA, PT , Pembelian Cable Power NYAF
                                                         10MM Black 1.000 MTR, Cable Power NYAF 10MM
                                                         Red 1.000 MTR, Cable NYAF 10MM Yellow Supreme
1243     2-Jan-24      MANDIRI IDR       1220011559559   1.000 MTR                                                  77,089,500    69,450,000    7,639,500              -         77,089,500
                                                         TELCO ABADI JAYA, PT , Pembelian Padlock Jacket
1244     2-Jan-24      MANDIRI IDR       1220011559559   40MM Sebanyak 600 Pcs                                      32,634,000    29,400,000    3,234,000              -         32,634,000
Page 183
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 69
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN                 NAMA VENDOR DAN KETERANGAN                     BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                         PUTERATEL ANDALAN SUKSES, PT , Pembelian Joint
                                                         Closure 96 Core Sebanyak 50 Unit, Pigtail SM SC/APC
                                                         1M Sebanyak 100 Pcs, Pigtail SM FC/APC 2MM 1M
1245     4-Jan-24      MANDIRI IDR       1220011559559   Sebanyak 30 Unit                                           28,338,300    25,530,000    2,808,300              -         28,338,300
                                                         DIAN MUSTIKA AGUNG, PT , Pembelian Lock Padlock
                                                         Jacket 40MM Sebanyak 800 Pcs untuk Kebutuhan
1246     4-Jan-24      MANDIRI IDR       1220011559559   Administrastion Support                                    37,740,000    34,000,000    3,740,000              -         37,740,000
                                                         CIRCLECOM NUSANTARA INDONESIA, PT , Sewa lahan
                                                         di PIK site Kapuk Muara-016 periode 20 Okt 2023 - 19
                                                         Okt 2024, Kapuk Muara-020 periode 11 Des 2023 - 10
                                                         Des 2024, Kamal Muara-035 periode 18 Okt 2023 - 17
                                                         Okt 2024, Kamal Muara-025 periode 14 Nov 2023 - 13
1247     4-Jan-24      MANDIRI IDR       1220011559559   Nov 2024                                                  242,400,000   240,000,000   26,400,000      24,000,000       242,400,000
                                                         JELAJAH DATA SEMESTA, PT , Dedicated Internet
1248     4-Jan-24      MANDIRI IDR       1220011559559   Bandwidth 20Gbps periode Jan 2024                         981,000,000   900,000,000   99,000,000      18,000,000       981,000,000
                                                         AWAN KILAT SEMESTA, PT , Tagihan Revenue Sharing
                                                         periode November 2022 atas penjualan produk
1249     5-Jan-24      MANDIRI IDR       1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                  30,605,400    31,230,000          -          624,600         30,605,400
                                                         PRIMACOM INTERBUANA, PT , Sewa Local Loop
                                                         10Mbps Diskominfo Kota Bandung sebanyak 30 Site
1250     5-Jan-24      MANDIRI IDR       1220011559559   CCTV periode Nov 2023                                      26,160,000    24,000,000    2,640,000        480,000         26,160,000
                                                         PRIMACOM INTERBUANA, PT , Sewa Local Loop 25
                                                         Mbps Diskominfo Kota Bandung CCTV sebanyak 54
1251     5-Jan-24      MANDIRI IDR       1220011559559   Titik periode Nov 2023                                     58,860,000    54,000,000    5,940,000       1,080,000        58,860,000
                                                         BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
1252     5-Jan-24      MANDIRI IDR       1220011559559   Material dari PT DHJ ke WH Bali                            14,914,550    15,050,000      165,550        301,000         14,914,550
                                                         CITRA NIAGA LOGISTIK, PT , Biaya Pengiriman
1253     5-Jan-24      MANDIRI IDR       1220011559559   Material dari PT DHJ ke WH Bali                            13,874,000    14,000,000      154,000        280,000         13,874,000
                                                         DATAMEDIA MAKMUR PRATAMA, PT , Biaya Layanan
                                                         Content TV 42 Channel untuk Tenant RS Atma Jaya
1254     5-Jan-24      MANDIRI IDR       1220011559559   Pluit periode Des 2023                                     12,740,000    13,000,000          -          260,000         12,740,000
                                                         BINAMITRA MEGAWARNA, PT , Pembelian Flyer
                                                         Residential dan Beacon Periode Okt 2023 Tipe Sticker
                                                         A 14.500 Lbr, Flyer Residential dan Beacon Periode
1255     5-Jan-24      MANDIRI IDR       1220011559559   Oktober Tipe Sticker C 33.500 Lbr, dll                     15,672,020    14,378,000    1,581,580        287,560         15,672,020
                                                         PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                         Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                         dan Monopole Triwulan I/2024 Periode Jan-Mar 2024 -
1256     9-Jan-24      MANDIRI IDR       1220011559559   PPN                                                        62,741,748           -     62,741,748              -         62,741,748
                                                         PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                         Tagihan Kompensasi atas Pemasangan Kabel Fiber
                                                         dan Monopole Triwulan I/2024 Periode Jan-Mar 2024 -
1257     9-Jan-24      MANDIRI IDR       1220011559559   PPN1                                                        8,668,062           -      8,668,062              -          8,668,062
                                                         FPU PENJAGA SITE , Biaya pembayaran penjaga site
                                                         dan uang canang bulan Desember 2023 Transfer Bank
1258     10-Jan-24     MANDIRI IDR       1220011559559   Sinarmas di 65 site BTS                                    39,600,000    39,600,000          -                -         39,600,000
                                                         INTILAND DEVELOPMENT TBK, PT (JAKARTA) , Sewa
                                                         Penempatan Perangkat di Gedung Intiland Tower
                                                         Jakarta Level Basement 1 periode 20 Nov 2023 - 19
1259     11-Jan-24     MANDIRI IDR       1220011559559   Nov 2024                                                   22,220,000    22,000,000    2,420,000       2,200,000        22,220,000
                                                         NUSA KIRANA REAL ESTATE, PT , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Gedung
                                                         Kirana Boutique Berdasarkan Penggunaan Jaringan
1260     11-Jan-24     MANDIRI IDR       1220011559559   Internet periode April - Juni 2023                         11,057,790    10,948,307    1,204,313       1,094,830        11,057,790
Page 184
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 70
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK            DPP            PPN             PPh         NET DIBAYARKAN
                                                         NUSA KIRANA REAL ESTATE, PT , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Gedung
                                                         Kirana Boutique Berdasarkan Penggunaan Jaringan
1261     11-Jan-24     MANDIRI IDR       1220011559559   Internet periode Juli - September 2023                      19,681,194     19,486,331     2,143,496       1,948,633        19,681,194
                                                         PLN PERSERO, PT , Biaya Tagihan Listrik PLN
1262     12-Jan-24     MANDIRI IDR       1220011559559   Pascabayar BTS Region Bali Periode Januari 2024          1,360,215,900   1,360,215,900          -                -       1,360,215,900
                                                         PLN PERSERO, PT , Biaya PLN Autodebet Jawa Timur
1263     12-Jan-24     MANDIRI IDR       1220011559559   Periode Januari 2024                                       195,938,803    195,938,803           -                -        195,938,803
                                                         PLN PERSERO, PT , Biaya PLN Auto Debet Region Jawa
1264     12-Jan-24     MANDIRI IDR       1220011559559   Barat Periode Januari 2024                                  69,897,820     69,897,820           -                -         69,897,820

                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN
1265     12-Jan-24     MANDIRI IDR       1220011559559   Pascabayar Region Jawa Tengah Periode Januari 2024         152,259,690    152,259,690           -                -        152,259,690
                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN
                                                         Jabodetabek - Periode Januari 2024 (Pemakaian
1266     12-Jan-24     MANDIRI IDR       1220011559559   Desember 2023)                                           2,646,604,866   2,646,604,866          -                -       2,646,604,866
                                                         NOKIA SOLUTIONS and NETWORK INDONESIA, PT ,
                                                         Jasa Maintenance OLT FX-4 Period Q4 24 Jul 2023 - 23
1267     15-Jan-24     MANDIRI IDR       1220011559559   Okt 2023                                                   308,079,544    282,641,783    31,090,596       5,652,835       308,079,544
                                                         MONETI INDO TEKNO, PT , Pembelian SFP SM 10GB
                                                         10KM Sebanyak 1 Unit, Switch C93000-24T-A Cisco
                                                         Sebanyak 1 Unit, Switch Network Module C9300-NM-
1268     16-Jan-24     MANDIRI IDR       1220011559559   8X Sebanyak 1 Unit                                          86,580,000     78,000,000     8,580,000              -         86,580,000
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1269     16-Jan-24     MANDIRI IDR       1220011559559   Phase 01 Jabotabek Periode Januari 2024                    236,981,000    236,981,000           -                -        236,981,000
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1270     16-Jan-24     MANDIRI IDR       1220011559559   Phase 01 Jawa Barat Periode Januari 2024                    47,364,500     47,364,500           -                -         47,364,500
                                                         FANAH JAYA MAINDO, PT , Pembelian Power Supply
                                                         48V 10A Sebanyak 40 Unit, Material FCLF8521P2BTL 1
1271     16-Jan-24     MANDIRI IDR       1220011559559   GBPS 10KM Finisar 10 Pcs,dll                                20,574,249     18,535,360     2,038,889              -         20,574,249
                                                         AISY ASPAK INDONESIA, PT , Pembelian Totem Nokia
1272     16-Jan-24     MANDIRI IDR       1220011559559   Beacon Sebanyak 10 Pcs                                      15,260,000     14,000,000     1,540,000        280,000         15,260,000
                                                         PRM PEMBANGUNAN PERUMAHAN NASIONAL , Sewa
                                                         Penempatan Perangkat di Gedung Rusunami Bandar
                                                         Kemayoran Tower A2-A3 periode 10 Jun 2023 - 09 Jun
1273     17-Jan-24     MANDIRI IDR       1220011559559   2024                                                        32,000,001     35,555,556           -         3,555,555        32,000,001
                                                         PRM PEMBANGUNAN PERUMAHAN NASIONAL , Sewa
                                                         Penempatan Perangkat di Gedung Rusunami Bandar
                                                         Kemayoran Tower A4-A5 periode 10 Jun 2023 - 09 Jun
1274     17-Jan-24     MANDIRI IDR       1220011559559   2024                                                        32,000,001     35,555,556           -         3,555,555        32,000,001
                                                         GEMILANG CATUR PERSADA, PT , Biaya Sewa Local
                                                         Loop 2 Gbps (Alcen) - Omadata Surabaya periode Des
1275     17-Jan-24     MANDIRI IDR       1220011559559   2023                                                        27,766,414     25,474,600     2,801,106        509,292         27,766,414
                                                         TOWER BERSAMA, PT , Sewa Local Loop (BOD) 1Gbps
                                                         untuk Kebutuhan Event Red Hat 2024 di Nusa Dua
                                                         Convention Centre Bali periode 15 - 17 Nov 2023
1276     17-Jan-24     MANDIRI IDR       1220011559559   (Trial) dan 21 - 25 Jan 2024                                52,320,000     48,000,000     5,280,000        960,000         52,320,000
                                                         SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                         Dedicated dan Broadband West BSD untuk 54 Tenant
1277     17-Jan-24     MANDIRI IDR       1220011559559   periode Okt 2023                                            85,063,600     78,040,000     8,584,400       1,560,800        85,063,600
                                                         INDOSAT TBK, PT , Biaya Sewa Domestic Ethernet Link
                                                         (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6 Jakarta
1278     17-Jan-24     MANDIRI IDR       1220011559559   periode Des 2023                                            97,020,000     89,010,000     9,790,000       1,780,000        97,020,000
                                                         PL PERHIMPUNAN PENGHUNI RUSUN HUNIAN
                                                         KONDOMINIUM KINTAMANI , Sewa Penempatan
                                                         Perangkat di Gedung Kondominium Kintamani
1279     17-Jan-24     MANDIRI IDR       1220011559559   periode 27 Des 2023 - 26 Des 2024                           16,443,000     18,270,000           -         1,827,000        16,443,000
Page 185
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 71
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                         GRAHANIAGA TATAUTAMA, PT , Sewa Jalur FO dari
                                                         Gedung Graha CIMB Niaga ke Gedung The Energy
1280     17-Jan-24     MANDIRI IDR       1220011559559   periode 01 Mei 2023 - 30 Apr 2024                            11,665,500    11,550,000    1,270,500       1,155,000        11,665,500
                                                         DATAMEDIA MAKMUR PRATAMA, PT , Biaya Layanan
                                                         Content TV 42 Channel untuk Tenant RS Atma Jaya
1281     17-Jan-24     MANDIRI IDR       1220011559559   Pluit periode Jan 2024                                       12,740,000    13,000,000          -          260,000         12,740,000
                                                         INTERNETINDO DATA CENTRA INDONESIA, PT ,
                                                         Tagihan Kelebihan Pemakaian Listrik Rack No Winter
1282     17-Jan-24     MANDIRI IDR       1220011559559   233 Per 1 - 30 Nov 2023 (IDC Indonesia)                      12,208,000    11,200,000    1,232,000        224,000         12,208,000
                                                         LINK NET TBK, PT , Link Net IDC D3 Jakarta to NIX Bali
1283     18-Jan-24     MANDIRI IDR       1220011559559   B00573-009 10Gbps periode Nov 2023                          201,650,000   185,000,000   20,350,000       3,700,000       201,650,000
                                                         LINK NET TBK, PT , Link Net IDC D3 Jakarta to NIX Bali
1284     18-Jan-24     MANDIRI IDR       1220011559559   B00573-009 10Gbps periode Des 2023                          201,650,000   185,000,000   20,350,000       3,700,000       201,650,000
                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
1285     18-Jan-24     MANDIRI IDR       1220011559559   Jakarta - Bali 5 Gbps periode Des 2023                       81,750,000    75,000,000    8,250,000       1,500,000        81,750,000
                                                         MEGA AKSES PERSADA, PT , Sewa Jabalink IPLC
                                                         Jakarta - Singapore (Fiberstar) 30 Gbps Periode Des
1286     18-Jan-24     MANDIRI IDR       1220011559559   2023                                                        332,450,000   305,000,000   33,550,000       6,100,000       332,450,000
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber 2Core
                                                         Segmen Tangerang HH Plaza Summarecon - HH
                                                         Teknovatus, HH Teknovatus - MP Pondok Pinang
1287     19-Jan-24     MANDIRI IDR       1220011559559   periode Nov 2023                                             20,339,400    18,660,000    2,052,600        373,200         20,339,400
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1288     22-Jan-24     MANDIRI IDR       1220011559559   Phase 01 Jawa Tengah Periode Januari 2024                   136,266,000   136,266,000          -                -        136,266,000

                                                         BINAJASA SUMBER SARANA, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales periode Des 2023
1289     22-Jan-24     MANDIRI IDR       1220011559559   dan Insentif Div. Direct Sales periode Nov 2023             138,177,715   137,262,631    1,118,436        203,352        138,177,715
                                                         BALI PECATU GRAHA, PT , Biaya tagihan listrik dan IPL
                                                         BPG Bulan Januari 2024( pemakaian bulan Desember
1290     22-Jan-24    SINARMAS IDR        0002999994     2023)                                                        11,433,622    11,433,622          -                -         11,433,622

                                                         TRIMITRA PUTRA MANDIRI, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales periode Des 2023
1291     23-Jan-24     MANDIRI IDR       1220011559559   dan Insentif Div. Direct Sales periode Nov 2023             199,901,736   198,577,883    1,618,042        294,189        199,901,736

                                                         ANGKASA PURA SUPPORT, PT , Pembayaran Tagihan
                                                         Listrik Angkasa pura untuk site M_335 area Kargo,
                                                         M_334 AP Bali -Kantor Imigrasi, M_331 AP Bali -Hotel
                                                         Haris, M_332 AP Bali-Area Parkir, dan M_333 AP Bali -
1292     25-Jan-24     MANDIRI IDR       1220011559559   Departure Area Periode Sep 2023 - Oct 2023                   22,726,683    20,850,168    2,293,518        417,003         22,726,683
                                                         PRIMACOM INTERBUANA, PT , Sewa Local Loop
                                                         10Mbps Diskominfo Kota Bandung sebanyak 30 Site
1293     25-Jan-24     MANDIRI IDR       1220011559559   CCTV periode Des 2023                                        26,160,000    24,000,000    2,640,000        480,000         26,160,000
                                                         PPPSRS CIBUBUR VILLAGE APARTMENT , Sewa
                                                         Penempatan Perangkat di Apartement Cibubur Village
1294     25-Jan-24     MANDIRI IDR       1220011559559   periode 31 Agust 2023 - 30 Agust 2024                        45,000,000    50,000,000          -         5,000,000        45,000,000
                                                         MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                         dari MP Antosari ke MP Beringkit periode 05.08.2023 -
1295     25-Jan-24     MANDIRI IDR       1220011559559   04.09.2023                                                   28,955,850    26,565,000    2,922,150        531,300         28,955,850

                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
                                                         3Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
1296     25-Jan-24     MANDIRI IDR       1220011559559   Surabaya Omadata Center periode Des 2023                     32,700,000    30,000,000    3,300,000        600,000         32,700,000
Page 186
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                 Page 72
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                                NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                          BANK          DPP            PPN             PPh         NET DIBAYARKAN

                                                         ANGKASA PURA SUPPORT, PT , Pembayaran Tagihan
                                                         Listrik Angkasa pura untuk site M_335 area Kargo,
                                                         M_334 AP Bali -Kantor Imigrasi, M_331 AP Bali -Hotel
                                                         Haris, M_332 AP Bali-Area Parkir, dan M_333 AP Bali -
1297     25-Jan-24     MANDIRI IDR       1220011559559   Departure Area Periode Sep 2023 - Oct 2023                    22,726,683    20,850,168    2,293,518        417,003         22,726,683
                                                         PPPSRS CBD PLUIT , Sewa Area LG/04 CBD Pluit Sesuai
                                                         PKS 001/PSM-PPPSRS/CBD/III/2023 periode 01 Feb
1298     25-Jan-24     MANDIRI IDR       1220011559559   2023 - 31 Jul 2023                                            12,150,000    13,500,000          -         1,350,000        12,150,000
                                                         DUTA TELEKOMINDO NUSANTARA, PT , Tagihan
                                                         Revenue Sharing Penempatan Jaringan dan Layanan
                                                         Bali Fiber di Apartement Tifolia Pulomas periode Juli -
1299     25-Jan-24     MANDIRI IDR       1220011559559   September 2023                                                12,938,562    12,810,457    1,409,150       1,281,045        12,938,562
                                                         INDONESIA SUPER CORRIDOR, PT , Sewa Collocation
1300     25-Jan-24     MANDIRI IDR       1220011559559   Rack 42U (Rack 27) periode Jan 2024                           11,990,000    11,000,000    1,210,000        220,000         11,990,000
                                                         PPPRS KEBAGUSAN CITY , Sewa Penempatan
                                                         Perangkat di Apartement Kebagusan City periode 01
1301     25-Jan-24     MANDIRI IDR       1220011559559   Jan 2023 - 31 Des 2023                                        18,000,000    20,000,000          -         2,000,000        18,000,000
                                                         WAHANAGRIYA ANEKA PESONA, PT , Sewa
                                                         Penempatan Perangkat di Gedung Graha Anugeraha
1302     25-Jan-24     MANDIRI IDR       1220011559559   periode 26 Sept 2023 - 25 Sept 2024                           15,150,000    15,000,000    1,650,000       1,500,000        15,150,000
                                                         INDONESIA SUPER CORRIDOR, PT , Biaya Instalasi dan
                                                         Sewa Collocation Rack 42U (Rack 27) periode 02 - 31
1303     25-Jan-24     MANDIRI IDR       1220011559559   Des 2023                                                      13,783,226    12,645,161    1,390,968        252,903         13,783,226

                                                         PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                         Tagihan Kompensasi atas Pemasangan Kabel Fiber
1304     26-Jan-24    SINARMAS USD        0000670707     dan Monopole Triwulan I/2024 Periode Jan-Mar 2024            590,152,226   655,724,765                   65,572,539       590,152,226
                                                         SENAYAN TRIKARYA SEMPANA, PT , Biaya
                                                         Penempatan Sewa Perangkat Telekomunikasi
                                                         berdasarkan Revenue Sharing periode Juli -
1305     26-Jan-24       BCA IDR          3193058058     September 2023 di Gedung Plaza Senayan                        26,081,230    25,823,000    2,840,530       2,582,300        26,081,230
                                                         EQUINIX SINGAPORE PTE LTD , Biaya Sewa Rack
                                                         Colocation dan Interkoneksi Equinix Singapore
1306     26-Jan-24    SINARMAS IDR        0000240408     periode Des 2023                                             104,508,404   104,508,404          -                -        104,508,404
                                                         ARELION SINGAPORE Pte Ltd. , Biaya Sewa Telia IP
1307     26-Jan-24    SINARMAS USD        0000670707     Transit 3Gbps Periode Des 2023                                37,512,000    37,512,000          -                -         37,512,000
                                                         POWER TELECOM, PT , Biaya Sewa Dark Fiber 2Core
                                                         Segmen Tangerang HH Plaza Summarecon - HH
                                                         Teknovatus, HH Teknovatus - MP Pondok Pinang
1308     26-Jan-24       BCA IDR          3193058058     periode Okt 2023                                              20,339,400    18,660,000    2,052,600        373,200         20,339,400
                                                         DJAJA LISTRIK, PT , Pembelian Joint Closure 96 Core
                                                         Inline - NWC 10 Pcs, Joint Closure 24 Core Inlie- NWC
1309     29-Jan-24     MANDIRI IDR       1220011559559   5 Pcs,dll                                                     40,109,850    36,135,000    3,974,850              -         40,109,850
                                                         TEKNOVATUS SOLUSI SEJAHTERA, PT , Tagihan Sewa
                                                         Collocation Rack 47 U 19" periode Des 2023 dan
1310     29-Jan-24     MANDIRI IDR       1220011559559   Kelebihan Pemakaian Listrik periode Nov 2023                  25,537,174    23,428,600    2,577,146        468,572         25,537,174
                                                         SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                         Dedicated dan Broadband West BSD untuk 57 Tenant
1311     29-Jan-24     MANDIRI IDR       1220011559559   periode Nov 2023                                              84,518,578    77,539,979    8,529,398       1,550,799        84,518,578
                                                         DANAMAS INSAN KREASI ANDALAN, PT ,
                                                         Reimbursement Salary Outsource Div. Direct Sales
                                                         periode Des 2023 dan Insentif Div. Direct Sales
1312     29-Jan-24     MANDIRI IDR       1220011559559   periode Nov 2023                                             219,212,798   217,761,057    1,774,349        322,608        219,212,798
Page 187
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                              Page 73
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                  NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                      BANK          DPP           PPN             PPh         NET DIBAYARKAN
                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                         KONDOMINIUM TAMAN ANGGREK , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Mall &
                                                         Kondominium Taman Anggrek Berdasarkan Profit
1313     29-Jan-24     MANDIRI IDR       1220011559559   Sharing Periode November 2023                              11,022,045   12,246,716          -         1,224,671        11,022,045
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta site BTS
                                                         Perbatasan Purwakarta - Karawang, BTS Perbatasan
                                                         Purwakarta - Subang, BTS Pertigaan Plered, BTS
                                                         Bachaul Nageri Kaler, BTS Perbatasa Purwakarta -
1314     31-Jan-24     MANDIRI IDR       1220011559559   Bandung periode Jul 2023                                   32,449,977   29,770,621    3,274,768        595,412         32,449,977
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta site BTS
                                                         Perbatasan Purwakarta - Karawang, BTS Perbatasan
                                                         Purwakarta - Subang, BTS Pertigaan Plered, BTS
                                                         Bachaul Nageri Kaler, BTS Perbatasa Purwakarta -
1315     31-Jan-24     MANDIRI IDR       1220011559559   Bandung periode Agust 2023                                 31,848,454   29,218,765    3,214,064        584,375         31,848,454
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta site BTS
                                                         Perbatasan Purwakarta - Karawang, BTS Perbatasan
                                                         Purwakarta - Subang, BTS Pertigaan Plered, BTS
                                                         Bachaul Nageri Kaler, BTS Perbatasan Purwakarta -
1316     31-Jan-24     MANDIRI IDR       1220011559559   Bandung periode Sept 2023                                  33,231,366   30,487,491    3,353,624        609,749         33,231,366
                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung MSIG Berdasarkan
1317     1-Feb-24      MANDIRI IDR       1220011559559   Profit Sharing Oktober 2023                                46,703,250   42,075,000    4,628,250              -         46,703,250

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung Living World Bali
1318     1-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Oktober 2023                    29,716,222   26,771,371    2,944,851              -         29,716,222

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung The Plaza Office Tower
1319     1-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Oktober 2023                    39,068,670   35,197,000    3,871,670              -         39,068,670

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung The Plaza Shopping
1320     1-Feb-24      MANDIRI IDR       1220011559559   Center Berdasarkan Profit Sharing Oktober 2023             32,134,500   28,950,000    3,184,500              -         32,134,500
                                                         SEDHANA SARI BALI, PT , Tagihan Pemakaian Listrik
                                                         Site M_39 Pantai Berawa Periode Bulan Juli 2023 -
1321     1-Feb-24      MANDIRI IDR       1220011559559   Desember 2023                                              49,660,742   49,660,742          -                -         49,660,742
                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung Thamrin Nine
1322     1-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing Oktober 2023                    21,256,500   19,150,000    2,106,500              -         21,256,500
                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung Thamrin Nine
1323     1-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing November 2023                   19,036,500   17,150,000    1,886,500              -         19,036,500

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung Living World Bali
1324     1-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing November 2023                   19,591,500   17,650,000    1,941,500              -         19,591,500
                                                         MDT TOTAL SOLUTION, PT , Pembelian Joint Closure
                                                         48 Core Sebanyak 30 Pcs, Joint Closure 24 Core
1325     1-Feb-24      MANDIRI IDR       1220011559559   Sebanyak 30 Unit                                           18,981,000   17,100,000    1,881,000              -         18,981,000
Page 188
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 74
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                       BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                         MDT TOTAL SOLUTION, PT , Pembelian Joint Closure
                                                         24 Core Sebanyak 30 Unit, Joint Closure 48 Core
1326     1-Feb-24      MANDIRI IDR       1220011559559   Sebanyak 40 Unit                                           22,200,000    20,000,000    2,200,000              -         22,200,000
                                                         SUMBER BERKAT JAYA ABADI, PT , Biaya IPL untuk
                                                         Ruko BizHub Serpong untuk unit 18 periode Januari
1327     1-Feb-24      MANDIRI IDR       1220011559559   2024 - Desember 2024                                       14,533,750    14,533,750          -                -         14,533,750
                                                         PLN PERSERO, PT , Pembelian Token PLN di 30 site
                                                         KWH prabayar periode pemakaian bulan Februari
1328     2-Feb-24      MANDIRI IDR       1220011559559   2024                                                      131,867,500   131,867,500          -                -        131,867,500
                                                         PPPSRS KOMERSIAL HUNIAN PURI CASABLANCA ,
                                                         Sewa Penempatan Perangkat di Gedung Puri
1329     2-Feb-24      MANDIRI IDR       1220011559559   Casablanca periode 31 Jan 2024 - 30 Jan 2025               22,222,223    24,691,358          -         2,469,135        22,222,223

                                                         BIT TEKNOLOGI NUSANTARA, PT , Sewa Link FO Per 2
                                                         Core HUT Malang POI XL to HH-034 dan Mojolangu-
1330     2-Feb-24      MANDIRI IDR       1220011559559   004 to HH015 periode Okt 2022 - Jun 2023                   38,163,352    35,012,250    3,851,347        700,245         38,163,352

                                                         JAKARTA INFRASTRUKTUR PROPERTINDO, PT , Sewa
                                                         Slot Pipa Sarana Jaringan Utilitas Terpadu Ruas Jl.
1331     2-Feb-24      MANDIRI IDR       1220011559559   Mampang Prapatan periode 13 Jul 2023 - 12 Jul 2024         77,266,202    76,501,190    8,415,131       7,650,119        77,266,202
                                                         BALI UTAMA CAKRAWALA, PT , Biaya Penempatan
                                                         Sewa Perangkat Telekomunikasi di Discovery
                                                         Shopping Mall berdasarkan Revenue Sharing periode
1332     2-Feb-24      MANDIRI IDR       1220011559559   September - Oktober 2023                                   21,918,145    21,701,133    2,387,125       2,170,113        21,918,145
                                                         MORA TELEMATIKA INDONESIA, PT , Sewa Metro-E
                                                         1.5 Gbps NDC Jatinegara - Pop BTS Karawang periode
1333     2-Feb-24      MANDIRI IDR       1220011559559   18.05.2023 - 17.06.2023                                    38,396,129    35,225,806    3,874,839        704,516         38,396,129
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta site BTS
                                                         Perbatasan Purwakarta - Karawang, BTS Perbatasan
                                                         Purwakarta - Subang, BTS Pertigaan Plered, BTS
                                                         Bachaul Nageri Kaler, BTS Perbatasa Purwakarta -
1334     2-Feb-24      MANDIRI IDR       1220011559559   Bandung periode Jun 2023                                   31,163,100    28,590,000    3,144,900        571,800         31,163,100
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta site BTS
                                                         Perbatasan Purwakarta - Karawang, BTS Perbatasan
                                                         Purwakarta - Subang, BTS Pertigaan Plered, BTS
                                                         Bachaul Nageri Kaler, BTS Perbatasa Purwakarta -
1335     2-Feb-24      MANDIRI IDR       1220011559559   Bandung periode Okt 2023                                   32,998,250    30,273,624    3,330,098        605,472         32,998,250
                                                         BINAMITRA MEGAWARNA, PT , Pembelian Flyer
                                                         Residential dan Beacon Sticker A Sebanyak 5.000 Lbr,
                                                         Flyer Residential dan Beacon Sticker C Sebanyak
1336     2-Feb-24      MANDIRI IDR       1220011559559   22.000 Lbr, dll                                            14,878,500    13,650,000    1,501,500        273,000         14,878,500
                                                         JAKARTA INFRASTRUKTUR PROPERTINDO, PT , Sewa
                                                         Slot Pipa Sarana Jaringan Utilitas Terpadu Ruas Jl.
1337     2-Feb-24      MANDIRI IDR       1220011559559   Cikajang periode 20 Jul 2023 - 19 Jul 2024                 15,826,084    15,669,390    1,723,633       1,566,939        15,826,084
                                                         JAKARTA INFRASTRUKTUR PROPERTINDO, PT , Sewa
                                                         Slot Pipa Sarana Jaringan Utilitas Terpadu Ruas Jl.
1338     2-Feb-24      MANDIRI IDR       1220011559559   Suryo periode 27 Jun 2023 - 26 Jun 2024                    13,672,663    13,537,290    1,489,102       1,353,729        13,672,663
                                                         JAKARTA INFRASTRUKTUR PROPERTINDO, PT , Sewa
                                                         Slot Pipa Sarana Jaringan Utilitas Terpadu Ruas Jl.
                                                         Wolter Monginsidi periode 11 Sept 2023 - 10 Sept
1339     2-Feb-24      MANDIRI IDR       1220011559559   2024                                                       20,024,735    19,826,470    2,180,912       1,982,647        20,024,735
                                                         PUALAM KENCANA GEMILANG JAKARTA, PT , Sewa
                                                         Penempatan Perangkat di Gedung Perwata Tower
1340     6-Feb-24      MANDIRI IDR       1220011559559   periode 15 Des 2023 - 14 Des 2024                          27,270,000    27,000,000    2,970,000       2,700,000        27,270,000
Page 189
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 75
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                         PENGELOLA LANDMARK PLUIT, PT , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Gedung
                                                         Landmark Pluit Berdasarkan Revenue Sharing periode
1341     6-Feb-24      MANDIRI IDR       1220011559559   Oktober - November 2023                                      24,906,600    24,660,000    2,712,600       2,466,000        24,906,600
                                                         INFRA YES SOLUSINDO, PT , Biaya Management Fee
                                                         atas Revenue Sharing periode Desember 2023 di
1342     6-Feb-24      MANDIRI IDR       1220011559559   Apartement Green Pramuka                                     35,660,940    36,388,714          -          727,774         35,660,940

                                                         P3SRS APARTEMEN EAST PARK , Biaya Management
                                                         Fee atas Renenue Sharing periode Oktober 2020 -
1343     6-Feb-24      MANDIRI IDR       1220011559559   Januari 2021 di East Park Apartment                          16,724,848    17,066,171          -          341,323         16,724,848
                                                         MANGGALA GELORA PERKASA, PT , Biaya
                                                         Penempatan Perangkat Telekomunikasi berdasarkan
                                                         Revenue Sharing periode Juli - September 2023 di
1344     6-Feb-24      MANDIRI IDR       1220011559559   Mall Senayan City                                            12,647,693    11,603,387    1,276,373        232,067         12,647,693

                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH SUSUN APARTEMENT THE ELEMENTS , Biaya
                                                         Management Fee atas Revenue Sharing periode
1345     6-Feb-24      MANDIRI IDR       1220011559559   Oktober - Desember 2023 di Apartemen The Element             19,347,338    19,742,181          -          394,843         19,347,338
                                                         BINAMITRA MEGAWARNA, PT , Pembelian Sticker AP
                                                         Nokia Beacon Sebanyak 7882 Pcs, Sticker ONT 4 Port
1346     7-Feb-24      MANDIRI IDR       1220011559559   Sebanyak 11.848 Pcs,dll                                      30,716,907    28,180,648    3,099,871        563,612         30,716,907
                                                         FPU PENJAGA SITE , Pembayaran penjaga site dan
1347    12-Feb-24      MANDIRI IDR       1220011559559   uang canang bulan Januari 2024 di 65 site BTS                39,600,000    39,600,000          -                -         39,600,000
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta site BTS
                                                         Perbatasan Purwakarta - Karawang, BTS Perbatasan
                                                         Purwakarta - Subang, BTS Pertigaan Plered, BTS
                                                         Bachaul Nageri Kaler, BTS Perbatasa Purwakarta -
1348    12-Feb-24      MANDIRI IDR       1220011559559   Bandung periode Nov 2023                                     32,688,135    29,989,115    3,298,802        599,782         32,688,135
                                                         INDONESIA COMNETS PLUS, PT , Sewa Local Loop 5
                                                         Mbps Diskominfo Kab. Purwakarta site BTS
                                                         Perbatasan Purwakarta - Karawang, BTS Perbatasan
                                                         Purwakarta - Subang, BTS Pertigaan Plered, BTS
                                                         Bachaul Nageri Kaler, BTS Perbatasa Purwakarta -
1349    12-Feb-24      MANDIRI IDR       1220011559559   Bandung periode Des 2023                                     32,329,236    29,659,849    3,262,583        593,196         32,329,236
                                                         INDOSAT TBK, PT , Biaya Sewa Domestic Ethernet Link
                                                         (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6 Jakarta
1350    12-Feb-24      MANDIRI IDR       1220011559559   periode Jan 2024                                            103,560,000    95,010,000   10,450,000       1,900,000       103,560,000
                                                         LINK NET TBK, PT , Link Net IDC D3 Jakarta to NIX Bali
1351    12-Feb-24      MANDIRI IDR       1220011559559   B00573-009 10Gbps periode Jan 2024                          201,650,000   185,000,000   20,350,000       3,700,000       201,650,000
                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
                                                         3Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
1352    12-Feb-24      MANDIRI IDR       1220011559559   Surabaya Omadata Center periode Jan 2024                     32,700,000    30,000,000    3,300,000        600,000         32,700,000
                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
1353    12-Feb-24      MANDIRI IDR       1220011559559   Jakarta - Bali 5 Gbps periode Jan 2024                       81,750,000    75,000,000    8,250,000       1,500,000        81,750,000
                                                         MEGA AKSES PERSADA, PT , Sewa Jabalink IPLC
                                                         Jakarta - Singapore (Fiberstar) 30 Gbps Periode Jan
1354    12-Feb-24      MANDIRI IDR       1220011559559   2024                                                        332,450,000   305,000,000   33,550,000       6,100,000       332,450,000

                                                         CYBER TEKNOLOGI PUTRAWAN, PT , Tagihan Revenue
                                                         Sharing atas Pendapatan Penggunaan Jaringan Kabel
                                                         Fiber Optik periode Oktober - Desember 2023 di Bali
1355    12-Feb-24      MANDIRI IDR       1220011559559   Pecatu Graha New Kuta Beach                                  14,061,000    12,900,000    1,419,000        258,000         14,061,000
Page 190
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 76
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK            DPP            PPN             PPh         NET DIBAYARKAN
                                                         JEJARING ULTRA PRIMA, PT , Biaya Sewa Penempatan
                                                         Perangkat Telekomunikasi di Kawasan Summarecon
                                                         Corporate Berdasarkan Profit Sharing Juli - September
1356    13-Feb-24      MANDIRI IDR       1220011559559   2023                                                       109,533,740    100,489,669    11,053,864       2,009,793       109,533,740
                                                         JEJARING ULTRA PRIMA, PT , Biaya Sewa Penempatan
                                                         Perangkat Telekomunikasi di Kawasan Summarecon
                                                         Residential Berdasarkan Profit Sharing Juli -
1357    13-Feb-24      MANDIRI IDR       1220011559559   September 2023                                             160,662,703    147,396,975    16,213,667       2,947,939       160,662,703
                                                         PLN PERSERO, PT , Biaya Tagihan Listrik PLN
1358    16-Feb-24      MANDIRI IDR       1220011559559   Pascabayar BTS Region Bali Periode Februari 2024         1,420,416,403   1,420,416,403          -                -       1,420,416,403
                                                         NOBI PUTRA ANGKASA, PT , Tagihan 100% atas
                                                         Pengadaan Modular ACPDB-DCPDB 3Phase sebanyak
1359    16-Feb-24      MANDIRI IDR       1220011559559   30Pcs                                                      328,005,000    295,500,000    32,505,000              -        328,005,000
                                                         PLN PERSERO, PT , Biaya PLN Autodebet Jawa Timur
1360    16-Feb-24      MANDIRI IDR       1220011559559   Periode Februari 2024                                      190,527,318    190,527,318           -                -        190,527,318
                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN
                                                         Pascabayar Region Jawa Tengah Periode Februari
1361    16-Feb-24      MANDIRI IDR       1220011559559   2024                                                       146,108,248    146,108,248           -                -        146,108,248
                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN Pasca
1362    16-Feb-24      MANDIRI IDR       1220011559559   Bayar Region Jabodetabek Periode Februari 2024           2,522,475,743   2,522,475,743          -                -       2,522,475,743

                                                         PRM PEMBANGUNAN PERUMAHAN NASIONAL , Sewa
                                                         Penempatan Perangkat di Gedung Rusunawa
1363    19-Feb-24      MANDIRI IDR       1220011559559   1cCengkareng periode 01 Sept 2023 - 31 Agust 2024           35,350,000     35,000,000     3,850,000       3,500,000        35,350,000
                                                         GEMILANG CATUR PERSADA, PT , Biaya Sewa Local
                                                         Loop 2 Gbps (Alcen) - Omadata Surabaya periode Jan
1364    19-Feb-24      MANDIRI IDR       1220011559559   2024                                                        28,132,000     25,810,000     2,838,000        516,000         28,132,000
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1365    19-Feb-24      MANDIRI IDR       1220011559559   Phase 02 Jawa Tengah Periode Februari 2024                 138,738,000    138,738,000           -                -        138,738,000
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1366    19-Feb-24      MANDIRI IDR       1220011559559   Phase 02 Jawa Barat Periode Februari 2024                   51,136,500     51,136,500           -                -         51,136,500

                                                         WISMA KEIAI INDONESIA, PT , Tagihan Profit Sharing
                                                         Penempatan Perangkat Telekomunikasi di Gedung
1367    19-Feb-24      MANDIRI IDR       1220011559559   Wisma Keiai periode Oktober - Desember 2023                 18,328,470     18,147,000     1,996,170       1,814,700        18,328,470
                                                         DATAMEDIA MAKMUR PRATAMA, PT , Biaya Layanan
                                                         Content TV 42 Channel untuk Tenant RS Atma Jaya
1368    19-Feb-24      MANDIRI IDR       1220011559559   Pluit periode Feb 2024                                      12,740,000     13,000,000           -          260,000         12,740,000
                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                         KONDOMINIUM TAMAN ANGGREK , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Mall &
                                                         Kondominium Taman Anggrek Berdasarkan Profit
1369    19-Feb-24      MANDIRI IDR       1220011559559   Sharing Periode Januari 2024                                10,222,128     11,357,042           -         1,134,914        10,222,128
                                                         BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                         Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                         4/B.071 (Call Center) Periode 18 Dec 2023 - 17 Jan
1370    19-Feb-24      MANDIRI IDR       1220011559559   2024                                                        11,440,486     12,711,651           -         1,271,165        11,440,486

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung The Plaza Shopping
1371    20-Feb-24      MANDIRI IDR       1220011559559   Center Berdasarkan Profit Sharing November 2023             27,500,250     24,775,000     2,725,250              -         27,500,250

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung The Gedung MSIG
1372    20-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing November 2023                    46,703,250     42,075,000     4,628,250              -         46,703,250
Page 191
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                                Page 77
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN

                                                         INFRASTRUKTUR BISNIS SEJAHTERA, PT , Jasa Penguat
                                                         Sinyal untuk Tenant di Gedung The Plaza Office Tower
1373    20-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing November 2023                    51,255,145    46,175,806    5,079,339              -         51,255,145
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1374    20-Feb-24      MANDIRI IDR       1220011559559   Phase 02 Jabotabek Periode Februari 2024                   225,528,500   225,528,500          -                -        225,528,500
                                                         BALI PECATU GRAHA, PT , Biaya tagihan listrik dan IPL
                                                         Bali Pecatu Graha bulan Februari 2024 (pemakaian
1375    20-Feb-24     SINARMAS IDR        0002999994     bulan Januari 2024)                                         13,990,970    13,990,970          -                -         13,990,970
                                                         TRIMITRA PUTRA MANDIRI, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales Periode Jan 2024
1376    21-Feb-24      MANDIRI IDR       1220011559559   dan Insentif Periode Des 2023                              197,587,160   196,278,636    1,599,307        290,783        197,587,160
                                                         INDOKARYA SUKSES BERSAMA, PT , Sewa
                                                         Penempatan Perangkat di Gedung Apartement
                                                         Paradise Mansion periode 31 Agust 2023 - 30 Agust
1377    23-Feb-24      MANDIRI IDR       1220011559559   2026                                                        43,661,052    48,512,280          -         4,851,228        43,661,052
                                                         GEMILANG CATUR PERSADA, PT , Biaya Sewa Local
                                                         Loop 2 Gbps (Alcen) - Omadata Surabaya periode Feb
1378    23-Feb-24      MANDIRI IDR       1220011559559   2024                                                        27,907,024    25,603,600    2,815,296        511,872         27,907,024
                                                         BANGUNMUSTIKA INTIPERSADA, PT , Tagihan Sewa &
                                                         Service Charge Kantor Call Center & Acces Point Lt. 4
1379    23-Feb-24      MANDIRI IDR       1220011559559   Cipulir periode Apr - Jun 2024                             202,925,160   200,916,000   22,100,760      20,091,600       202,925,160
                                                         BINAJASA SUMBER SARANA, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales Periode Jan 2024
1380    23-Feb-24      MANDIRI IDR       1220011559559   dan Insentif Periode Des 2023                              145,322,963   144,360,559    1,176,271        213,867        145,322,963

                                                         BERUANG ADVERTISING SOLUSINDO, PT , Pembelian
                                                         Sticker Pole Ukuran 10x20 cm Sebanyak 1.522 Pcs,
1381    23-Feb-24      MANDIRI IDR       1220011559559   Banner Ukuran 50x70 cm Sebanyak 1.700 Pcs                   17,796,103    16,326,700    1,795,937        326,534         17,796,103
                                                         INDONESIA SUPER CORRIDOR, PT , Biaya Sewa
1382    23-Feb-24      MANDIRI IDR       1220011559559   Collocation Rack 42U (Rack 27) periode Feb 2024             11,990,000    11,000,000    1,210,000        220,000         11,990,000

                                                         MULIA INTIPELANGI, PT , Biaya Sewa Penempatan
                                                         Perangkat Telekomunikasi di Mall Taman Anggrek
1383    26-Feb-24      MANDIRI IDR       1220011559559   Berdasarkan Profit Sharing periode April - Juni 2023        18,616,403    18,432,082    2,027,529       1,843,208        18,616,403
                                                         TEKNOVATUS SOLUSI SEJAHTERA, PT , Tagihan Sewa
                                                         Collocation Rack 47 U 19" periode Jan 2024 dan
1384    27-Feb-24      MANDIRI IDR       1220011559559   Kelebihan Pemakaian Listrik periode Des 2023                28,683,568    26,315,200    2,894,672        526,304         28,683,568

                                                         PPPSRSS SAHID SUDIRMAN CENTER , Tagihan
                                                         Revenue Sharing Bali Fiber di Sahid Sudirman Center
1385    28-Feb-24      MANDIRI IDR       1220011559559   periode 01 Oktober 2023 - 31 Desember 2023                  24,770,250    24,525,000    2,697,750       2,452,500        24,770,250
                                                         NTT INDONESIA, PT , Sewa Crossconnect Establish
                                                         NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1386    28-Feb-24      MANDIRI IDR       1220011559559   Des 2023                                                    14,715,000    13,500,000    1,485,000        270,000         14,715,000
                                                         NTT INDONESIA, PT , Sewa Crossconnect Establish
                                                         NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1387    28-Feb-24      MANDIRI IDR       1220011559559   Jan 2024                                                    14,715,000    13,500,000    1,485,000        270,000         14,715,000
                                                         EQUINIX SINGAPORE PTE LTD , Biaya Sewa Rack
                                                         Colocation dan Interkoneksi Equinix Singapore
1388     1-Mar-24     SINARMAS IDR        0000240408     periode Jan 2024                                           108,750,629   108,750,629          -                -        108,750,629
                                                         EQUINIX SINGAPORE PTE LTD , Biaya Sewa Rack
                                                         Colocation dan Interkoneksi Equinix Singapore
1389     1-Mar-24     SINARMAS IDR        0000240408     periode Feb 2024                                           103,485,709   103,485,709          -                -        103,485,709
                                                         ARELION SINGAPORE Pte Ltd. , Biaya Sewa Telia IP
1390     1-Mar-24     SINARMAS USD        0000670707     Transit 3Gbps Periode Jan 2024                              37,512,000    37,512,000          -                -         37,512,000
Page 192
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 78
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                             NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN              NAMA VENDOR DAN KETERANGAN                        BANK          DPP            PPN             PPh         NET DIBAYARKAN

                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
                                                         3Gbps P2P dari IDC Duren Tiga ke Jabalink Bali Tower
1391     1-Mar-24      MANDIRI IDR       1220011559559   Surabaya Omadata Center periode Feb 2024                   32,700,000    30,000,000    3,300,000        600,000         32,700,000
                                                         MEGA AKSES PERSADA, PT , Sewa Layanan Jabalink
1392     1-Mar-24      MANDIRI IDR       1220011559559   Jakarta - Bali 5 Gbps periode Feb 2024                     81,750,000    75,000,000    8,250,000       1,500,000        81,750,000
                                                         MEGA AKSES PERSADA, PT , Sewa Jabalink IPLC
                                                         Jakarta - Singapore (Fiberstar) 30 Gbps Periode Feb
1393     1-Mar-24      MANDIRI IDR       1220011559559   2024                                                      332,450,000   305,000,000   33,550,000       6,100,000       332,450,000
                                                         PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                         Tagihan Kompensasi Persentase Revenue Sharing
                                                         Triwulan IV/2022 Periode 01 Oktober - Desember
1394     4-Mar-24      MANDIRI IDR       1220011559559   2022                                                       72,247,308    71,531,987    7,868,519       7,153,198        72,247,308
                                                         AWAN KILAT SEMESTA, PT , Tagihan Revenue Sharing
                                                         periode Desember 2023 atas penjualan produk
1395     4-Mar-24      MANDIRI IDR       1220011559559   BaliCloud Tenant PT Adia Pradipta Lestari                  30,605,400    31,230,000          -          624,600         30,605,400
                                                         AWAN KILAT SEMESTA, PT , Tagihan Revenue Sharing
                                                         periode Janari 2024 atas penjualan produk BaliCloud
1396     4-Mar-24      MANDIRI IDR       1220011559559   Tenant PT Adia Pradipta Lestari                            30,605,400    31,230,000          -          624,600         30,605,400
                                                         SAMUDERA PELABUHAN INDONESIA, PT , Sewa
                                                         Penempatan Perangkat di Gedung Graha Samudra
1397     4-Mar-24      MANDIRI IDR       1220011559559   periode 01 Feb 2024 - 31 Jan 2025                          33,582,500    33,250,000    3,657,500       3,325,000        33,582,500
                                                         IGNITE TECHNOLOGY INDONESIA, PT , Biaya
                                                         Pemasangan Konten Iklan Media Offline (Poster) di
                                                         dalam Lift Gedung Apartement sebanyak 37 Poster
1398     4-Mar-24      MANDIRI IDR       1220011559559   selama 4 Weeks - Desember 2023                             40,330,000    37,000,000    4,070,000        740,000         40,330,000
                                                         PPPSRS PERKANTORAN EKSEKUTIF SATRIO TOWER ,
                                                         Sewa Penempatan Perangkat di Gedung Satrio Tower
1399     4-Mar-24      MANDIRI IDR       1220011559559   periode 08 Des 2023 - 07 Des 2024                          75,760,000    75,010,000    8,250,000       7,500,000        75,760,000
                                                         MULIA CEMERLANG DIAN PERSADA, PT , Sewa
                                                         Penempatan Perangkat di Gedung Wisma GKBI
1400     4-Mar-24      MANDIRI IDR       1220011559559   periode 01 Mar 2024 - 28 Feb 2025                         127,260,000   126,000,000   13,860,000      12,600,000       127,260,000
                                                         SERPONG MAS TELEMATIKA, PT , Sewa Local Loop
                                                         Dedicated dan Broadband West BSD untuk 58 Tenant
1401     4-Mar-24      MANDIRI IDR       1220011559559   periode Des 2023                                           88,015,811    80,748,450    8,882,330       1,614,969        88,015,811

                                                         GRAHA LESTARI INTERNUSA, PT , Tagihan Revenue
                                                         Sharing 30% Jasa Koneksi Internet Wework di Gedung
1402     4-Mar-24      MANDIRI IDR       1220011559559   Noble House periode Oktober - Desember 2023                77,982,100    77,210,000    8,493,100       7,721,000        77,982,100
                                                         PUTERATEL ANDALAN SUKSES, PT , Pembelian Joint
1403     4-Mar-24      MANDIRI IDR       1220011559559   Closure 96 Core Sebanyak 50 Unit                           27,195,000    24,500,000    2,695,000              -         27,195,000
                                                         BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
                                                         Material Monopole 26M dan 30M dari PT DHJ ke WH
1404     4-Mar-24      MANDIRI IDR       1220011559559   Bali                                                       14,914,550    15,050,000      165,550        301,000         14,914,550
                                                         MANGGALA GELORA PERKASA, PT , Biaya
                                                         Penempatan Perangkat Telekomunikasi berdasarkan
                                                         Revenue Sharing periode Oktober - Desember 2023 di
1405     4-Mar-24      MANDIRI IDR       1220011559559   Mall Senayan City                                          12,257,050    11,245,000    1,236,950        224,900         12,257,050
                                                         NUSA KIRANA REAL ESTATE, PT , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Gedung
                                                         Kirana Boutique Berdasarkan Penggunaan Jaringan
1406     4-Mar-24      MANDIRI IDR       1220011559559   Internet periode Oktober - Desember 2023                   19,931,340    19,734,000    2,170,740       1,973,400        19,931,340

                                                         CITRA KIRANA HIJAU RETAIL, PT , Tagihan
                                                         Management Fee atas Profit Sharing periode Okotber -
1407     4-Mar-24      MANDIRI IDR       1220011559559   Desember 2023 di Gedung Green Sedayu Mall                  13,095,683    12,014,387    1,321,583        240,287         13,095,683
Page 193
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 79
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                               NILAI MUTASI                   NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                         BANK          DPP            PPN             PPh         NET DIBAYARKAN
                                                         PPPSRS KEBAGUSAN CITY , Sewa Penempatan
                                                         Perangkat di Gedung Apartement Kebagusan City
1408     4-Mar-24      MANDIRI IDR       1220011559559   periode 01 Jan 2024 - 31 Des 2024                            18,000,000    20,000,000          -         2,000,000        18,000,000

                                                         PLN PERSERO, PT , Pembelian Token PLN di 22 site
1409     6-Mar-24      MANDIRI IDR       1220011559559   KWH prabayar periode pemakaian bulan Maret 2024             101,255,500   101,255,500          -                -        101,255,500
                                                         FPU PENJAGA SITE , Pembayaran Penjaga Site dan
                                                         Uang Canang Bulan Februari 2024 (Transfer Bank
1410     8-Mar-24      MANDIRI IDR       1220011559559   Sinarmas di 65 Site BTS)                                     39,600,000    39,600,000          -                -         39,600,000
                                                         AP-CCTV FIELD OPERATION , Uang Muka Beban
                                                         Umum atas Pengajuan Biaya Kompensasi Listrik
                                                         Warga Project Jakwifi Batch 2 ( 1675 Pole - 1739
                                                         Penerima Kompensasi ) Periode 20 Februari - 20 Mei
1411     8-Mar-24      MANDIRI IDR       1220011559559   2024 - Trf                                                  823,950,000   823,950,000          -                -        823,950,000
                                                         AP-CCTV FIELD OPERATION , Uang Muka Beban
                                                         Umum atas Pengajuan Biaya Kompensasi Listrik
                                                         Warga Project Jakwifi Batch 3 ( 218 Pole - 219
                                                         Penerima Kompensasi ) Periode 20 Februari - 20 Mei
1412     8-Mar-24      MANDIRI IDR       1220011559559   2024 - Trf                                                  126,000,000   126,000,000          -                -        126,000,000
                                                         AP-CCTV FIELD OPERATION , Uang Muka Beban
                                                         Umum atas Pengajuan Biaya Kompensasi Listrik
                                                         Warga Project Jakwifi Batch 2 ( 1675 Pole - 1739
                                                         Penerima Kompensasi ) Periode 20 Februari - 20 Mei
1413     8-Mar-24      MANDIRI IDR       1220011559559   2024 - Trf                                                   62,250,000    62,250,000          -                -         62,250,000

                                                         AP-CCTV FIELD OPERATION , Uang Muka Beban
                                                         Umum atas Biaya Kompensasi Listrik Warga Project
                                                         Jakwifi Batch 1 ( 803 Pole-811 Penerima Kompensasi )
1414     8-Mar-24      MANDIRI IDR       1220011559559   Periode 20 Februari - 20 Mei 2024 - Trf                     411,300,000   411,300,000          -                -        411,300,000
                                                         ANGKASA PURA SUPPORT, PT , Pembayaran Tagihan
                                                         Listrik Angkasa pura untuk site M_335 area Kargo,
                                                         M_334 AP Bali -Kantor Imigrasi, M_331 AP Bali -Hotel
                                                         Haris, M_332 AP Bali-Area Parkir, dan M_333 AP Bali -
                                                         Departure Area Periode November 2023 - Desember
1415    12-Mar-24      MANDIRI IDR       1220011559559   2023                                                         32,552,017    29,864,235    3,285,066        597,284         32,552,017
                                                         P3SRS APARTEMEN EAST PARK , Biaya Management
                                                         Fee atas Revenue Sharing periode Februari - Oktober
1416    12-Mar-24      MANDIRI IDR       1220011559559   2021 di East Park Apartment                                  28,030,636    28,602,689          -          572,053         28,030,636
                                                         INFRA YES SOLUSINDO, PT , Biaya Management Fee
                                                         atas Revenue Sharing periode Januari 2024 di
1417    12-Mar-24      MANDIRI IDR       1220011559559   Apartement Green Pramuka                                     39,011,763    39,807,921          -          796,158         39,011,763
                                                         BUMI MULIA PERKASA DEVELOPMENT, PT , Sewa
                                                         Penempatan Perangkat di Gedung Atrium Mulia
1418    12-Mar-24      MANDIRI IDR       1220011559559   periode 01 Feb 2024 - 31 Jan 2025                            60,600,000    60,000,000    6,600,000       6,000,000        60,600,000
                                                         LINK NET TBK, PT , Link Net IDC D3 Jakarta to NIX Bali
1419    12-Mar-24      MANDIRI IDR       1220011559559   B00573-009 10Gbps periode Feb 2024                          201,650,000   185,000,000   20,350,000       3,700,000       201,650,000
                                                         MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                         dari MP Antosari ke MP Beringkit periode 05.09.2023 -
1420    12-Mar-24      MANDIRI IDR       1220011559559   04.10.2023                                                   28,955,850    26,565,000    2,922,150        531,300         28,955,850
                                                         MORA TELEMATIKA INDONESIA, PT , Sewa Core FO
                                                         dari MP Antosari ke MP Beringkit periode 05.10.2023 -
1421    12-Mar-24      MANDIRI IDR       1220011559559   04.11.2023                                                   28,955,850    26,565,000    2,922,150        531,300         28,955,850
                                                         BINAMITRA MEGAWARNA, PT , Pembelian Brosur
                                                         Tipe Depance A Sebanyak 6.500 Lbr, Brosur Tipe
1422    12-Mar-24      MANDIRI IDR       1220011559559   Depance C Sebanyak 102.000 Lbr, dll                          56,935,060    52,234,000    5,745,740       1,044,680        56,935,060
Page 194
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 80
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN                NAMA VENDOR DAN KETERANGAN                       BANK            DPP            PPN             PPh         NET DIBAYARKAN
                                                         PRIMACOM INTERBUANA, PT , Sewa Local Loop
                                                         10Mbps Diskominfo Kota Bandung sebanyak 30 Site
1423    12-Mar-24      MANDIRI IDR       1220011559559   CCTV periode Jan 2024                                       26,160,000     24,000,000     2,640,000        480,000         26,160,000
                                                         PRIMACOM INTERBUANA, PT , Sewa Local Loop 25
                                                         Mbps Diskominfo Kota Bandung CCTV sebanyak 54
1424    12-Mar-24      MANDIRI IDR       1220011559559   Titik periode Des 2023                                      58,860,000     54,000,000     5,940,000       1,080,000        58,860,000
                                                         PRIMACOM INTERBUANA, PT , Sewa Local Loop 25
                                                         Mbps Diskominfo Kota Bandung CCTV sebanyak 54
1425    12-Mar-24      MANDIRI IDR       1220011559559   Titik periode Jan 2024                                      58,860,000     54,000,000     5,940,000       1,080,000        58,860,000
                                                         CENTRA SARANA DATA, PT , Tagihan Revenue Sharing
                                                         Bali Fiber di Gedung UOB Plaza (Chubb Square)
1426    12-Mar-24      MANDIRI IDR       1220011559559   periode Oktober - Desember 2023                             12,491,400     11,460,000     1,260,600        229,200         12,491,400
                                                         PRM PEMBANGUNAN PERUMAHAN NASIONAL , Sewa
                                                         Penempatan Perangkat di Gedung Rusunawa
                                                         Cengkareng Tower Dahlia periode 01 Des 2023 - 30
1427    12-Mar-24      MANDIRI IDR       1220011559559   Nov 2024                                                    18,180,000     18,000,000     1,980,000       1,800,000        18,180,000
                                                         QUIROS NETWORKS, PT , Biaya Pemakaian Telepon
1428    12-Mar-24      MANDIRI IDR       1220011559559   Call Center Bulan Jan 2024                                  11,820,464     10,649,067     1,171,397              -         11,820,464
                                                         PPRSP VICTORIA , Sewa Penempatan Perangkat di
1429    12-Mar-24      MANDIRI IDR       1220011559559   Gedung Victoria periode 18 Jan 2024 - 17 Jan 2025           12,150,000     13,500,000           -         1,350,000        12,150,000
                                                         SMART TELECOM, PT , Internet Bandwidth 21site
1430    13-Mar-24      MANDIRI IDR       1220011559559   @50mbps (I : 8000001252)                                    95,331,048     87,459,677     9,620,564       1,749,193        95,331,048

                                                         INTI ALGORITMA PERDANA, PT , Tagihan
                                                         Management Fee atas Profit Sharing periode Oktober -
1431    14-Mar-24      MANDIRI IDR       1220011559559   Desember 2023 di Gedung South Quarter                       68,760,507     63,083,033     6,939,134       1,261,660        68,760,507
                                                         INDOSAT TBK, PT , Biaya Sewa Domestic Ethernet Link
                                                         (MPLS) MSC Gatsu Denpasar Bali to KPPTI Lt. 6 Jakarta
1432    14-Mar-24      MANDIRI IDR       1220011559559   periode Feb 2024                                           103,560,000     95,010,000    10,450,000       1,900,000       103,560,000
                                                         NTT INDONESIA, PT , Sewa Crossconnect Establish
                                                         NTT Ether 150 Mbps At Cargill Level 26 W 46 periode
1433    14-Mar-24      MANDIRI IDR       1220011559559   Feb 2024                                                    14,715,000     13,500,000     1,485,000        270,000         14,715,000
                                                         PENGEMBANGAN PARIWISATA INDONESIA, PT ,
                                                         Penggantian Biaya Listrik Bulan November 2023,
1434    15-Mar-24      MANDIRI IDR       1220011559559   Desember 2023, Januari 2024 site BTDC                       22,465,166     22,465,166           -                -         22,465,166
                                                         PLN PERSERO, PT , Biaya Tagihan Listrik PLN
1435    15-Mar-24      MANDIRI IDR       1220011559559   Pascabayar BTS Region Bali Periode Maret 2024            1,345,811,360   1,345,811,360          -                -       1,345,811,360
                                                         ASIA TELCO NETWORKS, PT , Pembelian SFP Bidi 10G
                                                         TX 1270/1330 DDM LC 40KM Sebanyak 20 Unit, SFP
                                                         Bidi 10G TX 1330/1270 DDM LC 40KM Sebanyak 20
1436    15-Mar-24      MANDIRI IDR       1220011559559   Unit                                                        45,510,000     41,000,000     4,510,000              -         45,510,000
                                                         FABCO GLOBAL INDONESIA, PT , Pembelian Gift Box
                                                         Balifiber (Hard Box, Card Holder dan Pulpen Metal
1437    15-Mar-24      MANDIRI IDR       1220011559559   Sebanyak 600 Set                                            32,928,000     33,600,000           -          672,000         32,928,000
                                                         GEMILANG CATUR PERSADA, PT , Biaya Sewa Local
                                                         Loop 2 Gbps (Alcen) - Omadata Surabaya periode Mar
1438    15-Mar-24      MANDIRI IDR       1220011559559   2024                                                        28,132,000     25,810,000     2,838,000        516,000         28,132,000
                                                         PLN PERSERO, PT , Biaya PLN Auto Debet Region Jawa
1439    15-Mar-24      MANDIRI IDR       1220011559559   Barat Periode Maret 2024                                    70,067,841     70,067,841           -                -         70,067,841

                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN
1440    15-Mar-24      MANDIRI IDR       1220011559559   Pascabayar Region Jawa Tengah Periode Maret 2024           143,048,267    143,048,267           -                -        143,048,267
                                                         PLN PERSERO, PT , Biaya PLN Autodebet Jawa Timur
1441    15-Mar-24      MANDIRI IDR       1220011559559   Periode Maret 2024                                         183,032,344    183,032,344           -                -        183,032,344
                                                         PLN PERSERO, PT , Biaya Tagihan KWH PLN
                                                         Pascabayar Periode Maret 2024 (Pemakaian Februari
1442    15-Mar-24      MANDIRI IDR       1220011559559   2024) - Jabotabek Area                                   2,377,524,153   2,377,524,153          -                -       2,377,524,153
Page 195
Lampiran Laporan Realisasi Penggunaan Dana Hasil Penawaran Umum                               Page 81
Rincian Modal Kerja

         TANGGAL
       PENGELUARAN                      NOMOR REKENING
          DI BANK  REKENING BANK YANG     BANK YANG                                                              NILAI MUTASI                     NILAI YANG DIBAYARKAN
NO.     STATEMENT      DIGUNAKAN          DIGUNAKAN               NAMA VENDOR DAN KETERANGAN                        BANK            DPP            PPN             PPh         NET DIBAYARKAN
                                                         BALI PECATU GRAHA, PT , Biaya tagihan listrik dan IPL
                                                         Bali Pecatu Graha bulan Maret 2024 (pemakaian
1443    15-Mar-24     SINARMAS IDR        0002999994     bulan Februari 2024)                                        13,858,922     13,858,922           -                -         13,858,922

                                                         PEMERINTAH KABUPATEN GRESIK , Uang Muka Beban
                                                         Umum atas Biaya Perpanjangan Sewa Lahan 19 Site
                                                         Wilayah Kabupaten Gresik Periode 1 Desember 2020
1444    18-Mar-24      MANDIRI IDR       1220011559559   s/d 31 November 2023 - PR:1010036362 - Trf               1,732,935,000   1,732,935,000          -                -       1,732,935,000
                                                         NTT INDONESIA, PT , Tagihan Revenue Sharing Bali
                                                         Fiber di Gedung Wisma BNI 46 periode Juli -
1445    20-Mar-24      MANDIRI IDR       1220011559559   September 2022                                              34,500,609     31,651,935     3,481,712        633,038         34,500,609
                                                         NTT INDONESIA, PT , Tagihan Revenue Sharing Bali
                                                         Fiber di Gedung Wisma BNI 46 periode Oktober -
1446    20-Mar-24      MANDIRI IDR       1220011559559   Desember 2022                                               39,755,641     36,473,065     4,012,037        729,461         39,755,641
                                                         NTT INDONESIA, PT , Tagihan Revenue Sharing Bali
                                                         Fiber di Gedung Wisma BNI 46 periode Januari -
1447    20-Mar-24      MANDIRI IDR       1220011559559   Maret 2023                                                  35,387,025     32,465,161     3,571,167        649,303         35,387,025
                                                         NTT INDONESIA, PT , Tagihan Revenue Sharing Bali
                                                         Fiber di Gedung Wisma BNI 46 periode April - Juni
1448    20-Mar-24      MANDIRI IDR       1220011559559   2023                                                        30,269,300     27,770,000     3,054,700        555,400         30,269,300
                                                         NTT INDONESIA, PT , Tagihan Revenue Sharing Bali
                                                         Fiber di Gedung Wisma BNI 46 periode Juli -
1449    20-Mar-24      MANDIRI IDR       1220011559559   September 2023                                              32,040,550     29,395,000     3,233,450        587,900         32,040,550
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1450    20-Mar-24      MANDIRI IDR       1220011559559   Phase 03 Jawa Barat Periode Maret 2024                      55,933,000     55,933,000           -                -         55,933,000
                                                         PLN PERSERO, PT , Pengajuan Token Pulsa Listrik
1451    20-Mar-24      MANDIRI IDR       1220011559559   Phase 03 Jawa Tengah Periode Maret 2024                    115,224,000    115,224,000           -                -        115,224,000
                                                         REVCOMM APAC INDONESIA, PT , Biaya Sewa Modul
                                                         Aplikasi untuk Kebutuhan Contact Center periode 16
1452    20-Mar-24      MANDIRI IDR       1220011559559   Februari 2024 - 15 Februari 2025                           267,486,000    245,400,000    26,994,000       4,908,000       267,486,000
                                                         PERHIMPUNAN PEMILIK DAN PENGHUNI SATUAN
                                                         RUMAH SUSUN HUNIAN DAN NON HUNIAN MAL &
                                                         KONDOMINIUM TAMAN ANGGREK , Biaya Sewa
                                                         Penempatan Perangkat Telekomunikasi di Mall &
                                                         Kondominium Taman Anggrek Berdasarkan Profit
1453    20-Mar-24      MANDIRI IDR       1220011559559   Sharing Periode Februari 2024                               10,177,548     11,308,386           -         1,130,838        10,177,548
                                                         ENLULU SUKSES MAKMUR, PT , Reimbursement Salary
                                                         Outsource Div. Direct Sales Periode Feb 2024 dan
1454    21-Mar-24      MANDIRI IDR       1220011559559   Insentif Periode Jan 2024                                   96,393,055     95,754,690       780,223        141,858         96,393,055
                                                         BINAJASA SUMBER SARANA, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales Periode Feb 2024
1455    21-Mar-24      MANDIRI IDR       1220011559559   dan Insentif Periode Jan 2024                              129,617,173    128,758,780     1,049,146        190,753        129,617,173
                                                         TRIMITRA PUTRA MANDIRI, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales Periode Feb 2024
1456    21-Mar-24      MANDIRI IDR       1220011559559   dan Insentif Periode Jan 2024                              201,925,509    200,588,253     1,634,423        297,167        201,925,509
                                                         PERMATA INDO SEJAHTERA, PT , Reimbursement
                                                         Salary Outsource Div. Direct Sales Periode Feb 2024
1457    21-Mar-24      MANDIRI IDR       1220011559559   dan Insentif Periode Jan 2024                               87,829,598     87,247,945       710,909        129,256         87,829,598
                                                         BENTENG ANUGERAH ASIH, PT , Biaya Pengiriman
1458    25-Mar-24      MANDIRI IDR       1220011559559   Material Monopole 30M dari PT DHJ ke WH Bali                14,914,550     15,050,000       165,550        301,000         14,914,550
                                                         BANGUNMUSTIKA INTIPERSADA, PT , Biaya atas
                                                         Pemakaian Listrik dan Air di ITC CIpulir Mas Lt.
                                                         4/B.071 (Call Center) Periode 18 Jan 2024 - 17 Feb
1459    25-Mar-24      MANDIRI IDR       1220011559559   2024                                                        10,739,626     11,932,917           -         1,193,291        10,739,626
                                                         PENGELOLA PUSAT BELANJA, PT , Sewa Penempatan
                                                         Perangkat di Mall @Bassura periode 01 Mar 2024 - 28
1460    25-Mar-24      MANDIRI IDR       1220011559559   Feb 2025                                                    12,120,000     12,000,000     1,320,000       1,200,000        12,120,000
Page 196

          

File

File Open PDF
Source IDX
Size2.01 MB
Published11 Jul 2024
Pages196
Characters1,501,604
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 41 people and organisations named in the text · linked when the evidence is strong

linked org LINK NET TBK p.10
linked org PT. Data Citra Mandiri p.14
linked org Bank Mandiri p.19 ×5
linked org Sekar Bumi Tbk p.30 ×5
linked org Ace Oldfields p.43
possible org Indosat Tbk p.26 ×2
unresolved org PT Telemedia Dinamika Sarana p.4
unresolved org Menteri Widya Chandra p.4
unresolved org PT Krakatau Wajatama Osaka p.7
unresolved org PT. Tangguh Sinergy Corporation p.9
unresolved org PT Asia Teknologi Solusi p.9 ×3
unresolved org PT China Huadian Hongkong p.9
unresolved org PT. Niaga Aneka Mode p.14
unresolved org PT. Bali Pawiwahan p.14
unresolved org PT. GlobalTeknologi Niaga p.14
unresolved org Pekerjaan FO Cut Corp p.21
unresolved org PT Matahari Graha Fantasi p.25
unresolved org PT Feedback Infra p.25
unresolved org PT Sisma p.25
unresolved org Koperasi Astha Karya Luhur p.26 ×4
unresolved org PT Asia Pro Berjangka p.26
unresolved org PT Patra Jasa p.27
unresolved org PT Kuat Andal Nan Gemilang p.27
unresolved org PT Medidata Indonesia p.29 ×2
unresolved org PT Indo Helmet Gallery p.30
unresolved org PT Citradimensi Arthali p.30 ×2
unresolved org Adira Dinamika Multifinance Tbk p.30 ×2
unresolved org PT Liwayway p.30 ×2
unresolved org PT Enha Cipta Inovasi p.30 ×2
unresolved org PT. Tirta Tegal Group p.35
unresolved org PT Adira Dinamika p.36
unresolved org Multifinance TBK p.36
unresolved org PT Sansaine Exindo p.39 ×2
unresolved org Yayasan Akademi Anak p.40
unresolved org PT Fiber p.41
unresolved org PT Fiber Network Indonesia p.41
unresolved org PT Hasmico Solusi Indonesia p.42
unresolved org PT Sigap p.48
unresolved org PT Kitchenette Lestari p.50
unresolved org PT MAP Aktiv Adi Perkasa p.50 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result