Page 1

          
Page 2
                 01                      02
        COMPANY OVERVIEW
                                             MILESTONE




    06
FINANCIAL
                                            03
                           BUSINESS            PRESTIGIOUS PROJECT AND
                                               CONTRIBUTION FOR THE NATION
                           INFOGRAPHIC




            05                           04
                                         MAJOR EQUIPMENT
OBTAINED PROJECT 2023
Page 3
                                     Disclaimer
The material in this presentation has been prepared by PT Pratama Widya Tbk (PTPW) and is general background information about PTPW activi-
ties current as at the date of this presentation and are subject to change without prior notice.

This information is given in summary form and does not purport to be complete. Information in this presentation, including forecast financial in-
formation, should not be considered as advice or a recommendation to investors or potential investors in relation to holding, purchasing or selling
securities or other financial products or instruments and does not take into account your particular investment objectives, financial situation or
needs. Before acting on any information you should consider the appropriateness of the information having regard to these matters, any relevant
offer document and in particular, you should seek independent financial advice.

This presentation may contain forward looking statements including statements regarding our intent, belief or current expectations with respect
to PTPW business and operations, market conditions, results of operation and financial condition, capital adequacy, specific provisions and risk
management practices. Readers are cautioned not to place undue reliance on these forward looking statements, past performance is not reliable
indication of future performance. PTPW does not undertake any obligation to publicly release the result of any revisions to these forward looking
statements to reflect events or circumstances after the date hereof to reflect the occurrence of unanticipated events.

We disclaim any responsibility or liability whatsoever arising which may be brought or suffered by any person as a result of acting in reliance upon
the whole or any part of the contents of this report and neither PTPW and/or its affiliated companies and/or their respective employees and/or
agents accepts liability for any errors, omissions, negligent or otherwise, in this report and any inaccuracy herein or omission here from which
might otherwise arise.
Page 4
                                     Company Overview

The company was founded in 1981 and is engaged in construction
services. The Company focuses on Foundation and Ground Impro-




                                                                                             VISION
vement services. Through the Foundation and Ground Improve-                                           OUR VISION
                                                                                                      Become a specialist provider of
ment service, the Company can carry out various activities such as                                    one-stop
Installing Bored Piles, Piling, Soil Improvement, Soil Testing, and                                   solution in the field of founda-
others.                                                                                               tion construction and soil im-
                                                                                                      provement in Indonesia.

The company also providing one stop solution of EPC (Engineering                                      To be the foremost antd most
Procurement and Construction) work in Foundation and Ground                                           comprehensive provider of




                                                                                             VALUES
Improvement works to support the growth prospects in the cons-                                        foundation construction and
                                                                      OUR VALUES                      soil
truction services business. EPC service covers the initial survey     Integrity, Teamwork,            Improvement services on-offs-
process, planning, material procurement, and construction pro-        Dynamic, Totality,              hore in Indonesia.
cess which are carried out simultaneously in a project contract.      Professional.
Page 5
       Board of Commissioner
Dr., Ir. Paulus Kurniawan., MBA., IPU
President Commissioner
  Bachelor of Geological Engineering at Gadjah Mada Universi-
  ty, Yogyakarta in 1977

  Master of Business Administration degree at OCU-USA in
  1987

  Doctorate degree at Economic and Business Faculty at
  Udayana University in Denpasar in 2012




                                      Dr., Ir. Paulus Kurniawan., MBA., IPU
                                                Independent Commissioner
                              Bachelor of Literature degree at Sebelas Maret University in
                                                                                     1992

                            Master of Development Economic at the Faculty of Economic
                                           and Business at Gajah Mada University in 2016

                            Asset Management and Property Valuation Certification Edu-
                                               cation at Gajah Mada University in 2018

                            Completed Asset Management and Property Valuation Certi-
                                                                fication Education
Page 6
                Board of Directors
Dr. Ir. Andreas Widhatama K, S.T., M.Sc., IPM
President Director
  Bachelor of Engineering education at the University of Indonesia in
  2003
  Master's Degree in Geotechnical Engineering at the University of
  Glasgow in 2004

  Doctorate in Economics and Business at Udayana University in 2018
  Associate Professional Engineer in 2022

  Engineer Degree in 2022




                          Dr. Ir. Cyrilus Winatama., S.T., B.Eng., M.Eng., IPM
                                                                      Director
                                   Bachelor of Civil Engineering at Queensland University of Technology
                                                                                      Brisbane in 2005

                                 Bachelor of Civil Engineering degree at the University Indonesia in 2006

                                Master of Civil Engineering at Queensland University of Technology Bris-
                                                                                           bane in 2008

                                       Doctor of Economics and Business at Udayana University in 2018.

                                                                 Associate Professional Engineer in 2022

                                                                                Engineer Degree in 2022
Page 7
                                                                      Milestone
               1981               Established with the name
                                  of PT Pratama Widya focuses
                JUNE, 3RD
                                  on soil investigation




    Started slope protection
         (soil nail, rock bolt,       1990
         shotcrete) business           JANUARY




               1992               Started dewatering and
                                  soil improvement
                MARCH             (grouting and injection) business




         Started bored pile,
     secant pile, soldier pile
and ground anchor business
                                      1995
                                       JANUARY
Page 8
                            Entered offshore
                                                          Milestone
        1999                (dock,skidway, seabridges,
                            reclamation) work business.
        2007                Started staking
                            and sheetpile business




 Entered diaphragm wall
                business       2012
                               JANUARY




         2015
                            Entered soil improvement
                            (jet grouting) business
         JANUARY




Entered Soil Improvement
    (cement deep mixing)        2019
                 business        JANUARY
Page 9
                                                                   Milestone
                               Became a Company
          2020                 listed in Indonesia
                               Stock Exchange
          7 FEBRUARY




  Named as the best issuer
in the building construction
         sector in the 2021
  Business Award Ceremony           2021
                                    SEPTEMBER




                               Entered
                               Microtunnelling business
          2022                 Established a subsidiary,
              JUNE             PT Pratama Beton Nusantara
                               which is engaged in the
                               manufacture of goods from cement,
                               lime, gypsum and asbestos.



     Readymix production            2023
 in Penajam, East Borneo            NOVEMBER
Page 10
Map of Operational Area
Page 11
                                      Prestigious Project Completed




Sumitomo Mitsui Construction Co.         PT RDMP Balikpapan JO         PT PP (Persero) Tbk     High Speed Railway Contractor
 PT Hutama Karya Joint Operation     Micropile work on the Pertamina   Kulonprogo Airport                Consortium
 Mass Rapid Transit (MRT) Jakarta   Refinery Development Master Plan                         Jakarta – Bandung High-Speed Rail
                                      (RDMP) Project in Balikpapan.
Page 12
                                     Prestigious Project Completed




  PT Waskita Karya (Persero) Tbk                                   PT Wijaya Karya (Persero) Tbk   PT Mcdermott Indonesia
                                     PT Adhi Karya (Persero) Tbk
Light Rail Transit (LRT) Palembang                                 Bored Pile Works for Dompak     Quay wall and Skid way
                                        Light Rail Transit (LRT)
                                                                    Bridge Construction Project
                                            JABODEBEK
Page 13
                             Contribution for The Nation
The Company participates in building IKN
The Company is involved in the development of the National Capi-
tal City as a subcontractor on a number of projects including:
1. IKN Toll Road KKT Kariangau-Sp. Tempadung Segment,
2. IKN Toll Road SP Tempadung - P. Balang Bridge Segment,
3. Roads in the Central Government Core Area,
4. West Side Axis Nationality Road,
5. Buildings and office areas of the Coordinating Ministry,
6. Flats for State Civil Apparatus 1,
7. Flats for the presidential security forces,
8. National Capital Logistics Jetty.

Semarang - Demak 1B Toll Road
This project is the first toll road in Indonesia to be built with a sea
wall. The Semarang-Demak Toll Road will reach 27 km. The pre-
sence of the Semarang-Demak Toll Road will increase the road
network and overcome flooding.
Page 14
Contribution for The Nation
             DAM
             Dams as a source of raw water have an important role for survival.
             Below are the dam projects being carried out by the Company in 2023:
             1. Temef Dam in Timor Tengah Selatan Regency,
             2. Bulango Ulu Dam in Gorontalo,
             3. Retaining wall for the Jlantah Karanganyar Dam in Central Java.
             Jakarta Sewerage Development
             Sewerage development will make sanitation in Jakarta healthier and
             canals, rivers, reservoirs and reservoirs can be protected from pollu-
             tion. The following are the projects carried out by the Company:
             1. Jet grouting sewerage development package 5 zone 1,
             2. Sewerage pipe network zone 1 package 6.
             Refinery Development Master Plan (RDMP) Balikpapan
             RDMP is a National Strategic Project and the largest project in Perta-
             mina's history. RDMP Balikpapan will increase Pertamina's refinery
             processing capacity by 100 thousand barrels per day, so that it will
             also reduce fuel imports. The Company participated in building the
             foundations of the Balikpapan RDMP.
Page 15
ISO
Page 16
                      AWARDS




The Best VIP Customer SUNWARD   Best Issuer In The Building Construction
Page 17
                   K3 Achievement




Best Company Safety Performance in RDMP Balikpapan JO   Best Company Safety Performance in
                                                        Batam City Ciputra Project
Page 18
                                   Major Equipment




Crawler Crane                          Diaphragm Wall               Rotary Drilling Rig
   32 UNITS                                3 UNITS                       26 UNITS




         Hydraulic Sta�c Pile Driver            Soil Improvement Equipments         Microtunnel Boring Machine
                   6 UNITS                                3 UNITS                             2 UNITS
Page 19
            Major Equipments



Excavator                  Jacro Drilling Rig                 Hammer Pile Driver
 19 UNITS                       8 UNITS                             2 UNITS




            Vibro Hammer                        Hammer Diesel
               8 UNITS                             14 UNITS
Page 20
                              Obtained Project 2023
* Proyek Bendungan Jlantah Karanganyar
* Proyek Pembangunan Rumah Susun Tower B Nuansa Cilangkap
* Proyek Pembangunan Jalan Tol IKN Segmen KKT Kariangau - Simpang Tempadung
* Proyek Paket Pembangunan Dermaga Logistik IKN
* Pembangunan Bendungan Bagong Paket 2
* Proyek Pembangunan Jalan di Dalam KIPP : Pembangunan Jalan Sumbu Kebangsaan Sisi Barat
* Proyek Pembangunan Jalan di Dalam KIPP : Paket Pembangunan Jalan Feeder (Distric) di Kawasan IKN
* Proyek Pembangunan Jalan di Dalam KIPP : Pembangunan Jalan Sumbu Kebangsaan Sisi Barat
* Proyek Perkuatan Breasting Dolphin BI Jetty
* Proyek Pembangunan Jalan di Dalam KIPP : Pembangunan Jalan Sumbu Kebangsaan Sisi Barat Proving Ground (Stages I)
* Proyek Bendungan Way Apu Paket I
* Proyek Pembangunan Jalan di Dalam KIPP : Pembangunan Jalan Sumbu Kebangsaan Sisi Barat
* Proyek Lanjutan Bendungan Temef
* Proyek Penambahan Lajur Ke 3 Segmen Cikande – Serang Timur Paket 1 dan 2 Pada Jalan Tol Tangerang - Merak
Page 21
Achievement 2023
Page 22
  Comparison of Targets at the
Beginning of the Financial Year with
       the Achieved Results
Page 23
Capital Structure
Page 24
Financial Statement
Page 25
Financial Statement
Page 26
Financial Statement
Page 27
Financial Statement
Page 28
Financial Statement
Page 29
Financial Statement
Page 30
                                      P
                                      R
                                      E



For more information, please email:
                                      S
                                      I
                                      S
                                      I
                                      p
                                      r




Corporate Secretary
                                      a
                                      t
                                      a
                                      m
                                      a




PT Pratama Widya Tbk
E: corsec@pratamawidya.com
                                          006HCWS
                                          M511-




Thank You.

File

File Open PDF
Source IDX
Size5.25 MB
Published19 Jun 2024
Pages30
Characters15,934
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 14 people and organisations named in the text · linked when the evidence is strong

linked org Pratama Widya Tbk p.3 ×7
linked person Ir. Paulus Kurniawan. p.5 ×5
linked person Dr. Ir. Cyrilus Winatama. p.6 ×2
linked org Hutama Karya p.11
possible person Dr. Ir. Andreas Widhatama K p.6 ×3
possible org PP (Persero) Tbk p.11 ×2
possible org Waskita Karya (Persero) Tbk p.12 ×2
possible org Wijaya Karya (Persero) Tbk p.12 ×2
possible org Adhi Karya (Persero) Tbk p.12 ×2
unresolved org Indonesia Stock Exchange p.9
unresolved org PT Pratama Beton Nusantara p.9
unresolved org PT RDMP Balikpapan JO p.11
unresolved org PT Hutama Karya Joint Operation p.11
unresolved org PT Mcdermott Indonesia p.12

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result