Back to announcement
20240430_WSKT_Laporan Informasi dan Fakta Material_31632166_lamp3.pdf
Financial statement Text extracted WSKTSource file signed link, expires in 15 minutes
Extracted text 210
Page 1
PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK DAN ENTITAS ANAK AND ITS SUBSIDIARIES LAPORAN KEUANGAN KONSOLIDASIAN INTERIM CONSOLIDATED INTERIM FINANCIAL STATEMENTS TANGGAL 31 MARET 2024 DAN 31 DESEMBER 2023 AS OF MARCH 31, 2024 AND DECEMBER 31, 2023 DAN UNTUK PERIODE-PERIODE TIGA BULAN AND FOR THE THREE MONTH PERIOD YANG BERAKHIR 31 MARET 2024 DAN 2023 ENDED MARCH 31, 2024 AND 2023
Page 2
PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED FINANCIAL STATEMENTS
TANGGAL 31 MARET 2024 DAN 31 DESEMBER 2023 AS OF MARCH 31, 2024 AND DECEMBER 31, 2023
DAN UNTUK PERIODE TIGA BULAN AND FOR THE TRHEE MONTH PERIOD
YANG BERAKHIR 31 MARET 2024 DAN 2023 ENDED MARCH 31, 2024 AND 2023
Daftar Isi Halaman/ Table of Contents
Pages
Surat Pernyataan Direksi Directors’ Statement Letter
Laporan Posisi Keuangan Konsolidasian 1 Consolidated Statements of Financial Position
Laporan Laba Rugi dan Penghasilan Komprehensif 3 Consolidated Statements of Profit or Loss and
Lain Konsolidasian Other Comprehensive Income
Laporan Perubahan Ekuitas Konsolidasian 4 Consolidated Statements of Changes in Equity
Laporan Arus Kas Konsolidasian 5 Consolidated Statements of Cash Flows
Catatan atas Laporan Keuangan Konsolidasian 6 Notes to the Consolidated Financial Statements
Page 3
Page 4
The original consolidated financial statements included herein are in
the Indonesian language.
PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM FINANCIAL POSITION
31 Maret 2024 dan 31 Desember 2023 March 31, 2024 and December 31, 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain) (Expressed in full Rupiah amount, unless otherwise stated)
31 Maret/ 31 Desember/
Catatan/ March 31, 2024 December 31, 2023
Notes Rp Rp
ASET ASSETS
ASET LANCAR CURRENT ASSETS
Kas dan Setara Kas 5, 57 2.850.737.198.629 1.340.065.112.240 Cash and Cash Equivalents
Kas yang Dibatasi Penggunaannya 5 5.414.655.123.996 6.698.167.060.090 Restricted Cash
Investasi Jangka-Pendek 6 8.448.200.000 8.448.200.000 Short-Term Investments
Piutang Usaha - Bersih Accounts Receivable - Net
Pihak Berelasi 7, 57 2.537.673.151.380 1.128.731.788.636 Related Parties
Pihak Ketiga 7 364.538.827.318 521.591.791.974 Third Parties
Piutang Retensi - Bersih Retention Receivables - Net
Pihak Berelasi 9, 57 1.319.886.623.755 1.213.958.889.589 Related Parties
Pihak Ketiga 9 269.209.798.404 276.308.727.097 Third Parties
Piutang Lain-lain lancar - Bersih Other Current Receivables - Net
Pihak Berelasi 10, 57 735.795.455.420 969.400.717.289 Related Parties
Pihak Ketiga 10 50.476.736.148 52.759.431.675 Third Parties
Piutang Ventura Bersama 8, 57 349.245.025.036 360.741.426.135 Joint Ventures Receivable
Persediaan - Bersih 11 4.180.080.974.542 4.192.464.528.137 Inventories - Net
Tagihan Bruto Kepada Pengguna Jasa - Bersih Gross Amounts Due From Customers - Net
Bagian Lancar Current Portion
Pihak Berelasi 12, 57 3.439.081.016.136 3.322.024.421.101 Related Parties
Pihak Ketiga 12 1.403.168.836.082 1.174.684.646.350 Third Parties
Aset Keuangan Atas Proyek Konsesi Financial Asset From Concession Project -
Bagian Lancar 23 25.872.902.032 30.382.221.195 Current Portion
Pajak Dibayar Dimuka 13a 764.080.716.015 621.103.612.176 Prepaid Taxes
Uang Muka dan Biaya Dibayar Dimuka 14 1.247.254.491.913 811.102.644.464 Advances and Prepayments
TOTAL ASET LANCAR 24.960.205.076.806 22.721.935.218.148 TOTAL CURRENT ASSETS
ASET TIDAK LANCAR NON-CURRENT ASSETS
Investasi Pada Entitas Asosiasi dan Investment in Associates and
Ventura Bersama 15 3.834.018.845.810 2.323.013.265.928 Joint Ventures
Piutang Lain-lain Tidak Lancar - Bersih Other Non-Current Receivables - Net
Pihak Berelasi 10, 57 9.814.345.356.472 8.850.420.182.701 Related Parties
Properti Investasi 16 317.540.434.513 317.540.434.513 Investment Properties
Investasi Jangka Panjang Lainnya 17 869.738.189.820 869.738.189.820 Other Long-Term Investments
Aset Tetap - Bersih 18 4.896.121.495.653 5.007.639.998.795 Fixed Assets - Net
Aset Hak Guna - Bersih 19 15.895.405.900 26.419.477.533 Right-of-Use Assets - Net
Goodwill 20 3.341.708.741.197 4.025.903.165.936 Goodwill
Aset Tak Berwujud Intangible Assets
Hak Pengusahaan Jalan Tol 22 42.373.113.461.719 49.392.544.270.327 Toll Road Concession Rights
Aset Keuangan atas Proyek Konsesi 23 210.419.287.224 213.771.102.177 Financial Assets from Concession Project
Aset Pajak Tangguhan 13d 13.395.003.454 14.103.253.810 Deferred Tax Assets
Aset Lain-lain 21 1.558.491.857.121 1.832.868.898.279 Other Assets
TOTAL ASET TIDAK LANCAR 67.244.788.078.883 72.873.962.239.819 TOTAL NON-CURRENT ASSETS
TOTAL ASET 92.204.993.155.689 95.595.897.457.967 TOTAL ASSETS
Catatan terlampir merupakan bagian yang tidak terpisahkan dari The accompanying notes form an integral part of these
laporan keuangan konsolidasian. consolidated financial statements.
d6/February 5, 2014 1 paraf:
Page 5
The original consolidated financial statements included herein are in
the Indonesian language.
PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM FINANCIAL POSITION
31 Maret 2024 dan 31 Desember 2023 March 31, 2024 and December 31, 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain) (Expressed in full Rupiah amount, unless otherwise stated)
31 Maret/ 31 Desember/
Catatan/ March 31, 2024 December 31, 2023
Notes Rp Rp
LIABILITAS DAN EKUITAS LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK CURRENT LIABILITIES
Utang Usaha 24 5.917.034.460.253 5.661.220.681.629 Accounts Payable
Utang Bank Jangka Pendek Short-Term Bank Loans
Pihak Berelasi 25, 57 -- 20.504.115.167 Related Parties
Pihak Ketiga 25 700.127.052.202 700.127.052.202 Third Parties
Utang Bruto Subkontraktor Jangka Pendek 27 1.122.180.227.428 1.238.493.253.050 Short-Term Gross Amounts Due to Subcontractors
Biaya yang Masih Harus Dibayar 29 3.277.988.617.372 3.326.419.315.615 Accrued Expenses
Utang Pajak Jangka Pendek 13b 2.796.618.916.575 2.778.029.021.039 Short-Term Taxes Payables
Uang Muka Kontrak Jangka Pendek Advances on Short-Term Contracts
Pihak Berelasi 28, 57 177.439.794.506 12.652.378.380 Related Parties
Pihak Ketiga 28 871.508.406.166 823.918.531.988 Third Parties
Liabilitas Jangka Panjang yang Jatuh Tempo Current Maturities of
dalam Satu Tahun: Long-Term Liabilities:
Utang Bank 33 1.130.038.805.835 1.075.221.017.962 Bank Loans
Liabilitas Sewa Guna Usaha 37 3.953.575.127 7.157.455.725 Lease Liabilities
Surat Utang Jangka Menengah 30 250.000.000.000 250.000.000.000 Medium Term Notes
Utang Obligasi - Bersih 31 4.715.500.000.000 4.715.500.000.000 Bonds Payable - Net
Liabilitas Jangka Pendek Lainnya 32 865.538.794.605 2.229.199.098.279 Other Short-Term Liabilities
TOTAL LIABILITAS JANGKA PENDEK 21.827.928.650.069 22.838.441.921.036 TOTAL CURRENT LIABILITIES
LIABILITAS JANGKA PANJANG NON-CURRENT LIABILITIES
Utang Bank Jangka Panjang Long-Term Bank Loans
Pihak Berelasi 33, 57 25.615.293.911.332 27.557.563.985.227 Related Parties
Pihak Ketiga 33 18.673.251.132.723 18.485.772.857.399 Third Parties
Utang Ventura Bersama Jangka Panjang 1.430.792.639.368 1.332.247.776.159 Long-Term Joint Venture Payables
Utang Lembaga Keuangan Non Bank Jangka Panjang Long-Term Non-Bank Financial Institution Loans
Pihak Berelasi 26, 57 4.876.988.386.910 4.685.856.201.641 Related Parties
Pihak Ketiga 26 1.114.109.356.341 1.099.421.185.155 Third Parties
Utang Bruto Jangka Panjang Long-Term Gross Amounts Due to Subcontractors
Pihak Ketiga 27 475.609.550.051 449.220.116.865 Third Parties
Uang Muka Kontrak Jangka Panjang Advances on Long-Term Contracts
Pihak Berelasi 36, 57 7.283.008.022 7.283.008.022 Related Parties
Pihak Ketiga 36 454.095.925.683 464.119.742.908 Third Parties
Liabilitas Pajak Tangguhan 13d 8.356.506.532 7.147.603.151 Deferred Tax Liabilities
Utang Pajak Jangka Panjang 13b 283.619.686.764 283.619.686.764 Long-Term Taxes Payable
Utang Lain-lain Jangka Panjang Other Long-Term Payables
Pihak Ketiga 35 302.981.024.836 310.522.632.588 Third Parties
Liabilitas Jangka Panjang - Setelah Dikurangi Long-Term Liabilities -
Bagian Jatuh Tempo dalam Satu Tahun: Net of Current Maturities:
Liabilitas Sewa Guna Usaha 37 14.767.797.617 20.781.049.872 Lease Liabilities
Surat Utang Jangka Menengah 30 500.569.423.217 485.727.511.026 Medium Term Notes
Utang Obligasi - Bersih 31 4.118.306.533.821 4.113.124.933.131 Bonds Payable - Net
Sukuk Mudharabah 31 1.145.264.415.046 1.145.181.107.470 Sukuk Mudharabah
Obligasi Wajib Konversi 38 673.572.216.124 651.812.439.998 Mandatory Convertible Bonds
Liabilitas Imbalan Kerja 39 53.027.277.744 56.542.148.396 Employee Benefit Liabilities
TOTAL LIABILITAS JANGKA PANJANG 59.747.888.792.131 61.155.943.985.772 TOTAL NON-CURRENT LIABILITIES
TOTAL LIABILITAS 81.575.817.442.200 83.994.385.906.808 TOTAL LIABILITIES
EKUITAS EQUITY
Modal Saham Share Capital
Modal Saham - Nilai Nominal Rp 100 per Saham Share Capital - Rp 100 par Value per Share
Modal Dasar - 1 Saham Seri A Dwi Warna dan Authorized Capital - 1 Dwi Warna Serie A Share and
54.295.803.999 Saham Seri B pada 31 Maret 2024 54,295,803,999 Serie B Shares at March 31, 2024
dan 31 Desember 2023 and December 31, 2023
Modal Ditempatkan dan Disetor Penuh - Subscribed and Fully Paid Capital
1 Saham Seri A Dwi Warna dan 28.806.807.015 1 Dwi Warna Serie A Share and 28,806,807,015
Saham Seri B pada 31 Maret 2024 Serie B Shares at March 31, 2024
dan 31 Desember 2023 40 2.880.680.701.600 2.880.680.701.600 and December 31, 2023
Tambahan Modal Disetor 41 13.642.597.077.556 13.565.914.226.785 Additional Paid-in Capital
Saldo Laba (Defisit) 42 Retained Earnings (Deficit)
Telah Ditentukan Penggunaannya 1.725.598.750.818 1.725.598.750.818 Appropriated
Belum Ditentukan Penggunaannya (14.640.357.022.608) (13.710.682.193.585) Unappropriated
Komponen Ekuitas Lainnya 818.761.787.770 820.271.962.578 Other Components of Equity
Jumlah Ekuitas yang Dapat Diatribusikan Total Equity Attributable to
Kepada Pemilik Perusahaan 4.427.281.295.136 5.281.783.448.196 Owners of the Company
Kepentingan Non-Pengendali 50 6.201.894.418.353 6.319.728.102.963 Non-Controlling Interests
JUMLAH EKUITAS 10.629.175.713.489 11.601.511.551.159 TOTAL EQUITY
JUMLAH LIABILITAS DAN EKUITAS 92.204.993.155.689 95.595.897.457.967 TOTAL LIABILITIES AND EQUITY
Catatan terlampir merupakan bagian yang tidak terpisahkan dari The accompanying notes form an integral part of these
laporan keuangan konsolidasian. consolidated financial statements.
d6/February 5, 2014 2 paraf:
Page 6
The original consolidated financial statements included herein are in
the Indonesian language.
PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
LAPORAN LABA RUGI DAN INTERIM CONSOLIDATED STATEMENTS OF
PENGHASILAN KOMPREHENSIF LAIN PROFIT OR LOSS AND
KONSOLIDASIAN INTERIM OTHER COMPREHENSIVE INCOME
Untuk Periode Tiga Bulan yang Berakhir For the Three Month Period Ended
31 Maret 2024 dan 2023 March 31, 2024 and 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain) (Expressed in full Rupiah amount, unless otherwise stated)
31 Maret / March 31,
Catatan/ 2024 2023*)
Notes Rp Rp
Pendapatan Usaha 43, 57 2.177.892.692.823 2.731.846.331.214 Revenues
Beban Pokok Pendapatan 44 (1.861.104.725.053) (2.331.410.079.939) Cost of Revenues
LABA BRUTO 316.787.967.770 400.436.251.275 GROSS PROFIT
Beban Penjualan 45 (46.076.816.828) (29.923.004.382) Selling Expenses
Beban Umum dan Administrasi 45 (365.935.145.328) (325.657.180.503) General and Administrative Expenses
Beban - Non-contributing Plant 46 (23.262.035.642) (79.432.345.234) Non-contributing Plant - Expenses
Beban Pajak Final 13e (28.046.155.450) (53.359.551.761) Final Tax Expenses
Pendapatan Bunga 106.289.900.232 224.332.850.758 Interest Income
Keuntungan (Kerugian) Selisih Kurs - Bersih 4.929.811.335 (5.788.736.028) Gain (Loss) on Foreign Exchange - Net
Pendapatan Lain - lain - Bersih 47 158.534.310.032 356.211.935.071 Other Income - Net
LABA SEBELUM BEBAN KEUANGAN PROFIT BEFORE FINANCIAL CHARGES
DAN LABA (RUGI) BERSIH AND EQUITY IN NET PROFIT (LOSS) OF
ENTITAS ASOSIASI DAN VENTURA BERSAMA 123.221.836.121 486.820.219.196 ASSOCIATES AND JOINT VENTURES
Beban Keuangan 48 (1.099.421.379.964) (703.969.585.660) Finance Charges
Bagian Laba (Rugi) Bersih Equity in Net Profit (Loss)
Entitas Asosiasi dan Ventura Bersama 49 (59.830.091.766) (131.846.150.862) of Associates and Joint Ventures
RUGI SEBELUM PAJAK (1.036.029.635.609) (348.995.517.326) LOSS BEFORE TAX
Beban Pajak Penghasilan 13f (21.360.012.849) (46.365.250.778) Income Tax Expenses
RUGI TAHUN BERJALAN (1.057.389.648.458) (395.360.768.104) LOSS FOR THE YEAR
PENGHASILAN (BEBAN) KOMPREHENSIF LAIN OTHER COMPREHENSIVE INCOME (LOSS)
Pos-pos yang Tidak Akan Items that Will Not Be Reclassified
Direklasifikasi Kemudian ke Laba Rugi Subsequently to Profit or Loss
(Defisit) Surplus Revaluasi Aset Tetap -- (1.335.158.786) Revaluation (Deficit) Surplus on Fixed Assets
Pengukuran Kembali Program Remeasurement of Defined
Imbalan Pasti - Bersih -- 87.797.819 Benefit Obligations - Net
Pos yang Akan Direklasifikasi Item that May Be Reclassified
Kemudian ke Laba Rugi Subsequently to Profit or Loss
Selisih Kurs Penjabaran Exchange Differences on Transalation
Laporan Keuangan dari Kegiatan of Financial Statements of
Operasi Luar Negeri (1.693.091.338) 999.996 Foreign Operations
Total Beban Komprehensif Lain Total Other Comprehensive
Tahun Berjalan (1.693.091.338) (1.246.360.971) Loss For The Year
TOTAL RUGI KOMPREHENSIF TOTAL COMPREHENSIVE LOSS
PADA PERIODE BERJALAN (1.059.082.739.796) (396.607.129.075) FOR THE PERIOD
LABA (RUGI) YANG DAPAT DIATRIBUSIKAN KEPADA: PROFIT (LOSS) ATTRIBUTABLE TO:
Pemilik Perusahaan (939.551.265.976) (374.933.362.682) Owners of the Company
Kepentingan Non-Pengendali 50 (117.838.382.482) (20.427.405.422) Non-Controlling Interest
RUGI PERIODE BERJALAN (1.057.389.648.458) (395.360.768.104) LOSS FOR THE PERIOD
JUMLAH LABA (RUGI) KOMPREHENSIF YANG DAPAT TOTAL COMPREHENSIVE INCOME (LOSS)
DIATRIBUSIKAN KEPADA: ATTRIBUTABLE TO:
Pemilik Perusahaan (941.244.357.314) (376.179.723.653) Owners of the Company
Kepentingan Non-Pengendali 50 (117.838.382.482) (20.427.405.422) Non-Controlling Interest
JUMLAH RUGI KOMPREHENSIF TOTAL COMPREHENSIVE LOSS
PADA PERIODE BERJALAN (1.059.082.739.796) (396.607.129.075) FOR THE PERIOD
Rugi per saham Loss per share
Dasar 51 (32,62) (13,02) Basic
*) Direklasifikasi pada Catatan 61 *) As reclassified in Note 61
Catatan terlampir merupakan bagian yang tidak terpisahkan dari The accompanying notes form an integral part of these
laporan keuangan konsolidasian. consolidated financial statements.
d6/February 5, 2014 3 paraf:
Page 7
The original consolidated financial statements included herein are in
the Indonesian language.
PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
Untuk Periode Tiga Bulan yang Berakhir 31 Maret 2024 dan 2023 For the Three Month Period Ended March 31, 2024 and 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain) (Expressed in full Rupiah amount, unless otherwise stated)
Dapat Diatribusikan kepada Pemilik Entitas Induk/ Attributable to the Owners of the Company
Komponen Ekuitas Lainnya/
Other Components of Equity
Tambahan Modal Saldo Laba (Defisit)/ Retained Earnings (Deficit) Selisih Kurs Penjabaran Surplus (Defisit) Pengukuran kembali Kepentingan
Disetor/ Ditentukan Belum Ditentukan Laporan Keuangan/ Revaluasi/ liabilitas imbalan kerja/ Non-Pengendali/ Jumlah Ekuitas/
Modal Saham/ Additional Paid-In Penggunaannya/ Penggunaannya/ Jumlah/ Foreign Currency Revaluation Remeasurement of Jumlah/ Non-Controlling Total
Catatan/ Share Capital Capital Appropriated Unappropriated Total Translation Adjustment Surplus (Deficit) employee benefit liability Total Interests Equity
Notes Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
SALDO PER 31 DESEMBER 2022 2.880.680.701.600 13.565.914.226.785 1.725.598.750.818 (9.940.244.897.000) (8.214.646.146.182) 5.809.453.285 1.029.775.027.260 (168.188.151.335) 9.099.345.111.413 5.145.339.569.353 14.244.684.680.766 BALANCE AS OF DECEMBER 31, 2022
Surplus Revaluasi Aset Tetap -- -- -- -- -- -- (1.335.158.786) -- (1.335.158.786) -- (1.335.158.786) Revaluation Gain on Fixed Assets
Rugi Periode Berjalan -- -- -- (374.933.362.682) (374.933.362.682) -- -- -- (374.933.362.682) (20.427.405.422) (395.360.768.104) Loss for the Period
Pengukuran Kembali Program Imbalan Pasti Remeasurement of Defined
Bersih -- -- -- (87.797.819) (87.797.819) -- 87.797.819 -- -- -- -- Benefits Obligations Plan - Net
Selisih Kurs Penjabaran Laporan Keuangan Exchange Difference on translation
dari Kegiatan Usaha Luar Negeri -- -- -- -- -- 999.996 -- -- 999.996 -- 999.996 of Financial Statements of Foreign Operations
SALDO PER 31 MARET 2023 2.880.680.701.600 13.565.914.226.785 1.725.598.750.818 (10.315.266.057.501) (8.589.667.306.683) 5.810.453.281 1.028.527.666.293 (168.188.151.335) 8.723.077.589.941 5.124.912.163.931 13.847.989.753.872 BALANCE AS OF MARCH 31, 2023
SALDO PER 31 DESEMBER 2023 2.880.680.701.600 13.565.914.226.785 1.725.598.750.818 (13.710.682.193.585) (11.985.083.442.767) 5.875.479.516 1.057.935.699.716 (243.539.216.654) 5.281.783.448.196 6.319.728.102.963 11.601.511.551.159 BALANCE AS OF DECEMBER 31, 2023
Kepentingan Non-Pengendali 50 -- -- -- -- -- -- -- -- -- 4.697.872 4.697.872 Non-Controlling Interest
Rugi Periode Berjalan -- -- -- (939.551.265.976) (939.551.265.976) -- -- -- (939.551.265.976) (117.838.382.482) (1.057.389.648.458) Loss for the Period
Penyesuaian atas Perubahan Kepemilikan Adjustment for Changes in Ownership
Entitas Anak 46 -- 76.682.850.771 -- 10.059.353.483 10.059.353.483 -- -- -- 86.742.204.254 86.742.204.254 in Subsidiaries
Pengukuran Kembali Program Imbalan Pasti -- Remeasurement of Defined
Bersih -- -- -- (182.916.530) (182.916.530) -- -- 182.916.530 -- -- -- Benefits Obligations - Net
Selisih Kurs Penjabaran Laporan Keuangan Exchange of Differences on translation
dari Kegiatan Usaha Luar Negeri -- -- -- -- -- (1.693.091.338) -- -- (1.693.091.338) -- (1.693.091.338) of Financial Statements of Foreign Operations
SALDO PER 31 MARET 2024 2.880.680.701.600 13.642.597.077.556 1.725.598.750.818 (14.640.357.022.608) (12.914.758.271.790) 4.182.388.178 1.057.935.699.716 (243.356.300.124) 4.427.281.295.136 6.201.894.418.353 10.629.175.713.489 BALANCE AS OF MARCH 31, 2024
Catatan terlampir merupakan bagian yang tidak terpisahkan dari The accompanying notes form an integral part of these
laporan keuangan konsolidasian. consolidated financial statements.
d6/February 5, 2014 4 paraf:
Page 8
The original consolidated financial statements included herein are in
the Indonesian language.
PT WASKITA KARYA (PERSERO) TBK PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
LAPORAN ARUS KAS INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM OF CASH FLOWS
Untuk Periode Tiga Bulan yang Berakhir For the Three Month Period Ended
31 Maret 2024 dan 2023 March 31, 2024 and 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain) (Expressed in full Rupiah amount, unless otherwise stated
31 Maret/ March 31,
Catatan/ 2024 2023
Notes Rp Rp
ARUS KAS DARI AKTIVITAS OPERASI CASH FLOWS FROM OPERATING ACTIVITIES
Penerimaan Kas dari Pelanggan 2.011.033.549.399 4.131.949.993.639 Cash Receipts from Customers
Pengeluaran Kas kepada Pemasok (1.211.168.236.687) (3.944.333.154.856) Cash Paid to Suppliers
Pengeluaran Kas kepada Karyawan dan Direksi (232.848.095.612) (144.569.008.949) Cash Paid to Employees and Directors
Kas Dihasilkan dari Operasi 567.017.217.100 43.047.829.834 Cash Generated from Operations
Pembayaran Beban Keuangan (139.096.832.021) (261.850.609.850) Payment of Finance Charges
Penerimaan Restitusi Pajak 13 10.849.588.873 11.898.940.732 Receipt from Tax Restitutions
Pembayaran Pajak (187.693.465.464) (260.725.103.917) Payment of Taxes
Kas Bersih (Digunakan untuk) Diperoleh Dari Net Cash (Used in) Provided by
Aktivitas Operasi 251.076.508.488 (467.628.943.201) Operating Activities
ARUS KAS DARI AKTIVITAS INVESTASI CASH FLOWS FROM INVESTING ACTIVITIES
Penerimaan dari Ventura Bersama 63.499.728.607 33.077.768.387 Receipt from Joint Ventures
Penempatan pada Ventura Bersama (6.829.150.888) (13.199.127.510) Placement of Joint Ventures
Penempatan Deposito (918.487.500.000) -- Placement of Time Deposits
Penerimaan Pencairan Deposito 76.630.000.000 -- Receipt from Time Deposits
Perolehan Aset Tetap (9.403.238.093) (7.263.679.616) Acquisition of Fixed Assets
Penerimaan Penjualan Aset Tetap 11.059.561.126 -- Proceed from Sale of Fixed Assets
Penerimaan Investasi Jangka Pendek -- 20.728.008.449 Receipt from Short-Term Investments
Penerimaan atas Pelepasan Penyertaan Receipt from Disposal of Investment
Pada Entitas Anak dan Asosiasi 755.330.988.463 -- In Subsidiaries and Associates
Perolehan Aset Tak Berwujud (178.617.625.210) (962.496.886.834) Acquisition of Intangible Assets
Pinjaman Diberikan kepada Entitas Asosiasi -- (248.693.762.795) Additional Loans to Associates
Kas Bersih Digunakan untuk Aktivitas Investasi (206.817.235.995) (1.177.847.679.919) Net Cash Used in Investing Activities
ARUS KAS DARI AKTIVITAS PENDANAAN CASH FLOWS FROM FINANCING ACTIVITIES
Penerimaan Pendapatan Bunga 17.823.405.111 33.972.801.744 Receipt from Interest Income
Pembayaran Beban Keuangan (389.923.171.351) (494.394.072.347) Payment for Finance Charges
Penerimaan Pinjaman Bank Jangka Pendek 53 -- 12.000.000.000 Receipt from Short-Term Bank Loans
Penerimaan Pinjaman Bank Jangka Panjang 53 751.030.000 328.117.973.821 Receipt from Long-Term Bank Loans
Pembayaran Pinjaman Bank Jangka Pendek 53 -- (22.950.040.494) Payment of Short-Term Bank Loans
Pembayaran Pinjaman Bank Jangka Panjang 53 (1.719.784.039.977) (240.623.484.248) Payment of Long-Term Bank Loans
Penerimaan Pinjaman Lembaga Keuangan Non-Bank 53 98.887.833.204 601.684.935.988 Receipt from Non Bank Financial Institution Loans
Pembayaran Pinjaman Lembaga Keuangan Non-Bank 53 (2.390.657.647) -- Payment to Financial Institution Non Bank
Penerimaan Utang Lain Lain dari Receipt of Other Payables from
Pemegang Saham Non-Pengendali 53 1.866.900.751.489 -- Non-controlling Shareholders
Penerimaan Setoran Modal Saham 53 375.026.000.000 -- Receipt from Share Capital Issuance
Pembayaran Liabilitas Sewa 53 (14.631.285.746) (4.915.020.768) Payment of Lease Liabilities
Penempatan Uang Jaminan Pelaksanaan 53 324.461.999.892 -- Placement of Implementation Guarantee Money
Penurunan (Kenaikan) Kas yang Dibatasi Penggunaanya 53 1.286.145.406.627 -- Decrease (Increase) in Restricted Cash
Kas Bersih (Digunakan untuk) Net Cash (Used in) Provided
Diperoleh dari Aktivitas Pendanaan 1.843.267.271.602 212.893.093.696 by Financing Activities
KENAIKAN (PENURUNAN) BERSIH KAS DAN NET INCREASE (DECREASE) IN CASH AND
SETARA KAS 1.887.526.544.095 (1.432.583.529.424) CASH EQUIVALENTS
PENGARUH PERUBAHAN KURS EFFECT OF FOREIGN EXCHANGE
MATA UANG ASING (6.374.813.174) (5.301.471.807) RATE CHANGE
EFEK DIVESTASI (370.479.644.532) -- EFFECT OF DIVESTMENT
KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS
PADA AWAL TAHUN 1.340.065.112.240 8.945.714.916.518 AT THE BEGINNING OF YEAR
KAS DAN SETARA KAS CASH AND CASH EQUIVALENTS
PADA AKHIR TAHUN 3 2.850.737.198.629 7.507.829.915.287 AT THE END OF YEAR
Catatan terlampir merupakan bagian yang tidak terpisahkan dari The accompanying notes form an integral part of these
laporan keuangan konsolidasian. consolidated financial statements.
d6/February 5, 2014 5 paraf:
Page 9
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
1. UMUM 1. GENERAL
a. Pendirian dan Informasi Umum a. Establishment and General Information
Entitas Negara Waskita Karya (“Perusahaan”) The State-owned entity Waskita Karya
didirikan pada tanggal 1 Januari 1961 (“the Company”) was established on January 1,
berdasarkan Peraturan Pemerintah No. 62 tahun 1961 based on Government Regulation No. 62
1961, dari Perusahaan asing bernama "Volker year 1961, from a foreign company named
Aanemings Maatschappij NV" yang "Volker Aanemings Maatschappij NV" which was
dinasionalisasi Pemerintah Republik Indonesia. nationalized by the Government of
Perusahaan memulai kegiatan usaha the Republic of Indonesia. The Company started
komersialnya pada tanggal 1 Januari 1961. its commercial operations on January 1, 1961.
Berdasarkan Peraturan Pemerintah No. 40 tahun According to Government Regulation No. 40 year
1970 status Perusahaan berubah dari 1970, the Company’s status was changed from
Perusahaan Negara (PN) menjadi Perseroan State Enterprise into Perseroan (Persero).
(Persero). Selanjutnya, Perusahaan dinamakan Furthermore, the Company was named as
PT Waskita Karya (Persero) berdasarkan Akta PT Waskita Karya (Persero) in accordance with
Perseroan Terbatas No. 80 tanggal 15 Maret the Deed of Limited Liability Corporation No. 80
1973, yang dibuat di hadapan Kartini Mulyadi, dated March 15, 1973 of Kartini Mulyadi, S.H.,
S.H., Notaris di Jakarta. Akta Perseroan Notary in Jakarta. The deed was approved by
Terbatas tersebut telah disahkan oleh Menteri the Minister of Law on August 20, 1973 in his
Kehakiman pada tanggal 20 Agustus 1973 Decree No. 4.a.5/310/3 and stated on State
dengan Surat Keputusan No. 4.a.5/310/3 serta Gazette of Republic of Indonesia No. 82 on
diumumkan dalam Berita Negara Republik November 13, 1973, Supplement No. 91.
Indonesia No. 82 tanggal 13 November 1973,
Tambahan Berita Negara No. 91.
Anggaran Dasar Perusahaan telah beberapa kali The Company's Articles of Association has been
mengalami perubahan, terakhir berdasarkan amended several times, most recently by notarial
akta notaris No. 6 tanggal 21 Januari 2022 yang deed No. 6 dated January 21, 2022 by Notary
dibuat dihadapan Notaris Ashoya Ratam, S.H., Ashoya Ratam, S.H., M.Kn., in Jakarta, which
M.Kn., di Jakarta, yang telah mendapatkan has obtained Approval for Amendment to
Persetujuan Perubahan Anggaran Dasar the Company's Articles of Association
Perseroan No. AHU-0014815.AH.01.11 tanggal No. AHU- 0014815.AH.01.11 dated January 21,
21 Januari 2022 dan Penerimaan 2022 and Acceptance of Notification of
Pemberitahuan Perubahan Anggaran Dasar dari Amendment to the Articles of Association from
Kementerian Hukum dan Hak Asasi Manusia the Ministry of Law and Human Rights of
Republik Indonesia No. AHU-AH.01.03-0048528 the Republic of Indonesia No. AHU-AH.01.03-
tanggal 22 Januari 2022. Anggaran Dasar 0048528 dated January 22, 2022.
Perusahaan mengalami perubahan terkait pasal The Company's Articles of Association have
4 ayat 2 dan 3 tentang persetujuan pemegang been amended related to article 4 paragraphs 2
saham Perseroan untuk meningkatkan modal and 3 regarding approval of the Company's
ditempatkan dan disetor sejumlah sejumlah shareholders to increase the issued and paid-up
2.490.920.541 saham baru seri B yang capital by 2,490,920,541 new series B shares
merupakan saham baru hasil pelaksanaan Hak which are new shares resulted from the exercise
Memesan Efek Terlebih Dahulu, sehingga modal of Pre-emptive Rights, so that the new issued
ditempatkan dan disetor dari yang semula and paid-up capital of the original amounting to
sebesar Rp2.631.588.647.500 yang terbagi atas Rp2,631,588,647,500 which is divided into
26.315.886.475 lembar saham yang terdiri dari 1 26,315 886,475 shares consisting of 1 Series A
saham Seri A Dwiwarna atau setara dengan Dwiwarna share or equivalent to Rp100 and
Rp100 dan 26.315.886.474 saham Seri B atau 26,315,886.474 Series B shares or equivalent to
setara dengan Rp2.631.588.647.400 menjadi Rp2,631,588,647,400 to Rp2,880,680,701,600
sebesar Rp2.880.680.701.600 yang terbagi atas which is divided into 28,806,807,016 shares
28.806.807.016 lembar saham yang terdiri dari 1 consisting of 1 Dwiwarna Series A share or
saham Seri A Dwiwarna atau setara dengan equivalent to Rp100 and 28,806,807,015 Series
Rp100 dan 28.806.807.015 saham Seri B atau B shares or equivalent to Rp2,880,680,701,500.
setara dengan Rp2.880.680.701.500.
Perusahaan berkedudukan di Jakarta, dengan The Company is domiciled in Jakarta, with
kantor pusat beralamat di Jl. MT Haryono Kav. the head office located at Jl. MT Haryono Kav.
No. 10 Cawang, Jakarta 13340. No. 10 Cawang, Jakarta 13340.
- 12 -
Page 10
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
b. Maksud dan Tujuan b. Purposes and Objectives
c.
d. Sesuai dengan pasal 3 Anggaran Dasar In accordance with article 3 of the Company’s
Perusahaan, maksud dan tujuan Perusahaan Articles of Association, the objectives of
adalah melakukan usaha di bidang industri the Company are to conduct business in
konstruksi, industri pabrikasi, jasa penyewaan, construction industry, manufacturing industry,
jasa keagenan, investasi, agro industri, leasing service, agency services, investment,
pekerjaan terintegrasi (Engineering, agro industry, integrated work (Engineering,
Procurement and Construction: EPC), Procurement and Construction: EPC), trade,
perdagangan, pengelolaan kawasan, layanan area management, construction improvement
jasa peningkatan kemampuan di bidang services, information technology and tourism as
konstruksi, teknologi informasi serta well as optimizing the utilization of resources
kepariwisataan serta optimalisasi pemanfaatan owned by the Company to produce high quality
sumber daya yang dimiliki Perusahaan untuk and strong competitive goods and/or services to
menghasilkan barang dan/atau jasa yang gain/pursue profit to increase the Company's
bermutu tinggi dan berdaya saing kuat, untuk value by applying the principles of Limited
mendapat/mengejar keuntungan guna Liability Company.
meningkatkan nilai Perusahaan dengan
menerapkan prinsip-prinsip Perseroan Terbatas.
e.
f. Untuk mencapai maksud dan tujuan tersebut di In order to achieve these objectives,
atas, Perusahaan dapat melaksanakan kegiatan the Company engaged in activities such as
usaha yaitu Pekerjaan pelaksanaan konstruksi, Construction execution work, mining services,
jasa pertambangan, pekerjaan terintegrasi EPC, integrated EPC, design and build, building
rancang bangun, manajemen gedung, pabrikasi management, building components and raw
bahan dan komponen bangunan, pabrikasi material fabrication, component and construction
komponen dan peralatan konstruksi, pabrikasi tools fabrication, metals, woods, rubber, and
barang logam, kayu, karet dan plastik, plastic fabrication, agency services for raw
penyewaan peralatan konstruksi, layanan jasa materials, building components and construction
keagenan bahan dan komponen bangunan serta equipment, investment and/or business
peralatan konstruksi, investasi dan/atau management in area of basic facility and
pengelolaan usaha di bidang prasarana dan infrastructure and industry, export-import,
sarana dasar serta industri, ekspor-impor, general trading, system development, area
perdagangan umum, system development, management, and property and realty
pengelolaan kawasan, dan pengembangan development. In addition to the main business
properti dan realti. Selain kegiatan usaha utama, activities, the Company also carries out
Perusahaan juga melakukan kegiatan usaha supporting business activities such as
pendukung yakni layanan jasa konsultasi management consulting services, conducting
(konsultan) manajemen, melakukan usaha di business in the field of agro industry, and
bidang argo industri, dan layanan jasa bidang information technology and tourism services.
teknologi informasi dan kepariwisataan.
g.
h. Kegiatan usaha Perusahaan yang saat ini telah The Company's current business activities are
dijalankan Perusahaan adalah kegiatan construction activities and integrated EPC.
pelaksanaan konstruksi dan pekerjaan
terintegrasi EPC.
i. c. Penawaran Umum Saham c. Public Offering of Shares
j.
k. Perusahaan The Company
l. Pada tanggal 10 Desember 2012, Perusahaan On December 10, 2012, the Company’s obtained
memperoleh pernyataan efektif dari Ketua an effective statement from the Chairman of the
Badan Pengawas Pasar Modal dan Lembaga Capital Market and Financial Institution
Keuangan (Bapepam-LK) berdasarkan surat Supervisory Agency (Bapepam-LK) through the
keputusan No. S-14012/BL/2012. decision letter No. S-14012/ BL/2012.
m.
n. Pada tanggal 17 Desember 2012 berdasarkan On December 17, 2012, according to letter
surat No. S-08414/BEI.PPJ/12-2012 Bursa Efek No. S-08414/BEI.PPJ/12-2012, Indonesian
Indonesia (BEI) menyetujui penawaran efek Stock Exchange (IDX) agreed to the public
Perusahaan di BEI kepada masyarakat atas offering of the Company on IDX for
3.082.315.000 saham biasa dengan nilai nominal 3,082,315,000 of common stock with the par
- 13 -
Page 11
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Rp100 per saham dan harga penawaran Rp380 value Rp100 per share and the offering price
per saham. Rp380 per share.
o.
p. Dari jumlah saham yang ditawarkan dalam From the number of shares offered in the public
penawaran umum kepada masyarakat sebesar offering of 6.25% or 192,644,000 of new ordinary
6,25% atau sebanyak 192.644.000 saham biasa shares is allocated to the employees through the
atas nama baru dijatahkan kepada karyawan allocation shares program of the Company
Perusahaan melalui program penjatahan saham (Employee Stock Allocation/ ESA).
untuk pegawai Perusahaan (Employee Stock
Allocation/ ESA).
q.
r. Pada tanggal 19 Desember 2012, seluruh saham On December 19, 2012, a total of 9,632,236,000
Perusahaan sebanyak 9.632.236.000 saham shares of the Company were listed on the IDX.
telah tercatat pada BEI. Pada tanggal 10 Juni On June 10, 2015, the Company obtained an
2015, Perusahaan memperoleh pernyataan effective statement from The Board of
efektif dari Dewan Komisioner Otoritas Jasa Commissioners of the Financial Services
Keuangan (OJK) atas Pernyataan Pendaftaran Authority (OJK) of the Registration Statement in
dalam rangka Penawaran Umum Terbatas I the Limited Public Offering I (LPO I) through
(PUT I) berdasarkan surat keputusan No. the decision letter No. S-238/D.04/2015.
S-238/D.04/2015.
s.
t. Pada tanggal 7 Juli 2015, seluruh saham On July 7, 2015, all the Company’s shares
Perusahaan melalui PUT I sebanyak through the LPO I amounting to 3,653,498,200
3.653.498.200 saham telah tercatat pada BEI, shares that have been listed in the IDX, bringing
sehingga jumlah keseluruhan saham the number of shares of the Company after
Perusahaan setelah PUT I menjadi sebesar the LPO I amounting to 13,567,473,560 shares.
13.567.473.560 saham.
u.
Pada tanggal 16 Desember 2021, Perusahaan On December 16, 2021, the Company obtained
memperoleh pernyataan efektif dari Dewan an effective statement from the Board of
Komisioner Otoritas Jasa Keuangan (OJK) atas Commissioners of the Financial Services
Pernyataan Pendaftaran dalam rangka Authority (OJK) on the Registration Statement for
Penawaran Umum Terbatas II (PUT II) Kepada the Limited Public Offering II (LPO II) to
Para Pemegang Saham Perusahaam Dalam the Shareholders of the Company for the Pre-
Rangka Hak Memesan Efek Terlebih Dahulu emptive Rights Order (HMETD) based on
(HMETD) berdasarkan surat keputusan decision letter No. S-236/D.04/2021.
No. S-236/D.04/2021.
v.
w. Pada tanggal 30 Desember 2021, jumlah As of December 30, 2021, the total number of
keseluruhan saham Perusahaan setelah hasil shares of the Company after the results of
pelaksanaan Hak Memesan Efek Terlebih the exercise of the Pre-emptive Rights shares
Dahulu bagian dan disetor oleh Negara Republik and is paid up by the Republic of Indonesia
Indonesia menjadi sebesar 26.315.886.475 amounting to 26,315,886,475 shares.
saham.
x.
y. Pada tanggal 6 Januari 2022, jumlah As of January 6, 2022, the total number of shares
keseluruhan saham Perusahaan setelah hasil of the Company after the results of the exercise
pelaksanaan Hak Memesan Efek Terlebih of the Pre-emptive Rights shares and is paid up
Dahulu bagian dan disetor oleh Masyarakat by Public amounting to 28,806,807,016 shares.
menjadi sebesar 28.806.807.016 saham.
z. Entitas anak Subsidiaries
PT Waskita Beton Precast Tbk (WBP) PT Waskita Beton Precast Tbk (WBP)
Pada tanggal 20 Mei 2016, Perusahaan On May 20, 2016, the Company obtained a
memperoleh penetapan efek berupa efek determination of securities in the form of Islamic
Syariah dari Dewan Komisioner Otoritas Jasa securities from the Board of Commissioners of
Keuangan (OJK) berdasarkan surat keputusan Indonesia Financial Services Authority (OJK)
No. KCP.22/D.04/2016 untuk melakukan under the decree No. KCP.22/D.04/2016 for its
penawaran umum perdana kepada masyarakat initial public offering of 10,544,463,000 shares
atas 10.544.463.000 saham dengan nilai with a par value of Rp100 per share at
nominal Rp100 per saham dengan harga the offering price of Rp490 per share.
penawaran Rp490 per saham.
- 14 -
Page 12
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pada tanggal 8 September 2016, Perusahaan On September 8, 2016, the Company obtained
memperoleh pemberitahuan pernyataan efektif the notice of effectivity from OJK in its letter
dari OJK dengan suratnya No. S-495/D.06/2016. No. S-495/D.06/2016.
Pada tanggal 20 September 2016, Perusahaan On September 20, 2016, the Company has listed
telah mencatatkan 40% atau sebanyak 40% or 10,544,463,000 new shares on
10.544.463.000 saham baru pada Bursa Efek the Indonesia Stock Exchange. All shares issued
Indonesia. Seluruh saham yang diterbitkan oleh by the Company have been fully paid.
Perusahaan telah disetor penuh.
Pada tanggal 31 Maret 2024 dan 31 Desember As of Desember 31, 2023 and December 31,
2023 seluruh saham ditempatkan Perusahaan 2023, all of the Company's outstanding shares
telah dicatatkan pada Bursa Efek Indonesia. have been listed on the Indonesia Stock
Exchange.
Pada tanggal 1 Agustus 2022, terdapat On August 1, 2022, there was an announcement
pengumuman Potensi Delisting Perusahaan of the potential Delisting of
Tercatat PT Waskita Beton Precast Tbk (WBP) the Listed Company PT Waskita Beton Precast
tercatat di Papan: Pengembangan No. Peng- Tbk (WBP) listed on the Board: Development
00042/BEI.PP3/08-2022, telah disampaikan No. Peng-00042/BEI.PP3/08-2022, it has been
bahwa saham Perusahaan telah disuspensi di conveyed that the shares of the Company have
Pasar Modal selama 6 bulan dan masa suspensi been suspended in the Capital Market for 6
akan mencapai 24 bulan sampai tanggal 31 months and the suspension period will reach 24
Januari 2024. months until January 31, 2024.
Berdasarkan Pengumuman Potensi Delisting Based on the Announcement of the Potential
Perusahaan Tercatat PT Waskita Beton Precast Delisting of Listed Company PT Waskita Beton
Tbk (WBP) Tercatat di Papan Pengembangan Precast Tbk (WBP) which is Listed on the Board
No. Peng-00010/BEI.PP3/01-2023 tanggal Development No. Peng-00010/BEI.PP3/01-2023
31 Januari 2023, disampaikan bahwa saham dated January 31, 2023, it was announced that
Perusahaaan telah disuspensi di seluruh pasar the shares of the Company have been
selama 12 bulan dan masa suspensi akan suspended in all markets for 12 months and
mencapai 24 bulan pada tanggal 31 Januari the suspension period will be extended for 24
2024. months until January 31, 2024.
Berdasarkan Pengumuman Pencabutan Based on the Announcement of the Revocation
Penghentian Sementara Perdagangan Efek of the Temporary Suspension of PT Waskita
PT Waskita Beton Precast Tbk yang tercatat di Beton Precast Tbk Securities Trading which is
papan Pengembangan No. Peng-UPT- listed on the Development Board No. Peng-UPT-
00005/BEI.PP3/03- 2023 tanggal 17 Maret 2023, 00005/BEI.PP3/03-2023 dated March 17, 2023,
telah terpenuhinya kewajiban Perseroan, maka the Company's obligations have been fulfilled,
Bursa Efek Indonesia (BEI) memutuskan untuk and the Indonesia Stock Exchange (Bursa) has
melakukan pencabutan pemberhentian decided to revoke the temporary suspension of
sementara Perdagangan Efek (Saham dan the Company's trading securities (Shares and
Obligasi) Perusahaan di seluruh pasar terhitung Bonds) throughout the market starting from
sejak Sesi II Perdagangan Efek pada Jumat, Session II of Securities Trading on Friday, March
tanggal 17 Maret 2023. 17, 2023.
d. Penawaran Umum Obligasi dan Sukuk d. Public Offering Bonds and Sukuk
aa.
bb. Perusahaan The Company
Perusahaan telah menerbitkan obligasi dengan The Company has issued bonds for working
tujuan untuk dana kerja dan pengembangan capital and toll road development. The bonds are
jalan tol. Obligasi dicatatkan di BEI dengan listed on the IDX with the following details:
rincian sebagai berikut:
Jumlah/
Obligasi/ Amount Tahun/ Tanggal Penerbitan/ Jatuh Tempo/ Wali Amanat/
No Bonds Rp Years Date of Issuance Due Date Status Trustee
1 Berkelanjutan II Tahap III Seri B/
Shelf II Phase III Tranche B 910.000.000.000 5 21 Februari/ February 21, 2017 21 Februari/ February 21, 2022 Lunas/ Settled PT Bank Mega Tbk
2 Berkelanjutan III Tahap I Seri B/
Shelf III Phase I Tranche B 1.631.000.000.000 5 6 Oktober/ October 6, 2017 06 Oktober/ October 6, 2022 Lunas/ Settled PT Bank Mega Tbk
3 Berkelanjutan III Tahap II Seri B/
Shelf III Phase II Tranche B 2.276.500.000.000 5 23 Februari/ February 23, 2018 31 Desember/ December 31, 2024 Belum Jatuh Tempo/ Outstanding PT Bank Mega Tbk
4 Berkelanjutan III Tahap III Seri B/
Shelf III Phase III Tranche B 941.750.000.000 5 28 September/ September 28, 2018 31 Desember/ December 31, 2024 Belum Jatuh Tempo/ Outstanding PT Bank Mega Tbk
- 15 -
Page 13
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Jumlah/
Obligasi/ Amount Tahun/ Tanggal Penerbitan/ Jatuh Tempo/ Wali Amanat/
No Bonds Rp Years Date of Issuance Due Date Status Trustee
5 Berkelanjutan III Tahap IV Seri A/
Shelf III Phase IV Tranche A 484.000.000.000 3 16 Mei/ May 16, 2019 16 Mei/ May 16, 2022 Lunas/ Settled PT Bank Mega Tbk
6 Berkelanjutan III Tahap IV Seri B/
Shelf III Phase IV Tranche B 1.361.750.000.000 5 16 Mei/ May 16, 2019 16 Mei/ May 16, 2024 Belum Jatuh Tempo/ Outstanding PT Bank Mega Tbk
7 Berkelanjutan IV Tahap I/
Shelf IV Phase I 135.500.000.000 3 6 Agustus/ August 6, 2020 31 Desember/ December 31, 2024 Belum Jatuh Tempo/ Outstanding PT Bank Mega Tbk
8 Obligasi III Seri A/
Bond III Tranche A 722.000.000.000 5 24 September/ September 24, 2021 24 September/ September 24, 2026 Belum Jatuh Tempo/ Outstanding PT Bank Mega Tbk
9 Obligasi III Seri B/
Bond III Tranche B 1.051.000.000.000 7 24 September/ September 24, 2021 24 September/ September 24, 2028 Belum Jatuh Tempo/ Outstanding PT Bank Mega Tbk
10 Obligasi IV Seri A/
Bond IV Tranche A 658.000.000.000 5 12 Mei/ May 12, 2022 12 Mei/ May 12, 2027 Belum Jatuh Tempo/ Outstanding PT Bank KB Bukopin Tbk
11 Obligasi IV Seri B/
Bond IV Tanche B 1.469.300.000.000 7 12 Mei/ May 12, 2022 12 Mei/ May 12, 2029 Belum Jatuh Tempo/ Outstanding PT Bank KB Bukopin Tbk
Perusahaan telah menerbitkan sukuk The Company has issued sukuk mudharabah for
mudharabah dengan tujuan untuk dana kerja working capital and toll road development with
dengan rincian sebagai berikut: the following details:
Jumlah/
Obligasi/ Amount Tahun/ Tanggal Penerbitan/ Jatuh Tempo/ Wali Amanat/
No Bonds Rp Years Date of Issuance Due Date Status Trustee
Sesuai Ketentuan Skema
1 Berkelanjutan I Tahap I/ 500.000.000.000 3 5 Juli/ July 5, 2019 Perdamaian/According to the terms of Direstrukturisasi/ Restructured PT Bank Mega Tbk
the reconciliation scheme
Shelf I Phase I
Sesuai Ketentuan Skema
2 Berkelanjutan I Tahap II/ 1.500.000.000.000 3 30 Oktober/ October 30, 2019 Perdamaian/According to the terms of Direstrukturisasi/ Restructured PT Bank Mega Tbk
the reconciliation scheme
Shelf I Phase II
WBP WBP
WBP telah menerbitkan obligasi dengan rincian WBP has issued bonds with the following details
sebagai berikut: are as follows:
Jumlah/
Sukuk/ Amount Tahun/ Tanggal Penerbitan/ Jatuh Tempo/ Wali Amanat/
No Sukuk Rp Years Date of Issuance Due Date Status Trustee
1 Sukuk Mudharabah I Seri A/ 383.000.000.000 5 12 Mei/ May 12, 2022 12 Mei/ May 12, 2027 Belum Jatuh Tempo/ Outstanding PT Bank KB Bukopin Tbk
Sukuk Mudharabah I Tranche A
2 Sukuk Mudharabah I Seri B/ 765.100.000.000 7 12 Mei 2022/ May 12, 2022 12 Mei/ May 12, 2029 Belum Jatuh Tempo/ Outstanding PT Bank KB Bukopin Tbk
Sukuk Mudharabah I Tranche B
Obligasi Berkelanjutan I Tahap I Tahun 2019 Sustainable Bonds I Phase I 2019
Berdasarkan RUPO Berkelanjutan I Tahap I Based on the Sustainable RUPO I Phase I of
Tahun 2019 tanggal 15 Februari 2023, Para 2019 dated February 15, 2023, the Bondholders
Pemegang Obligasi menyetujui dan memberikan approved and authorized PT Bank Mega Tbk as
kuasa kepada PT Bank Mega Tbk selaku Wali Trustee of the Waskita Beton Precast
Amanat Obligasi Berkelanjutan I Waskita Beton Continuous Bond I Phase I of 2022 to make and
Precast Tahap I Tahun 2022 untuk membuat dan sign the Trustee Agreement for Waskita Beton
menandatangani Perjanjian Perwaliamatan Precast Mandatory Convertible Bond I In 2022, it
Obligasi Wajib Konversi Waskita Beton Precast I will be adjusted to the Peace Agreement which
Tahun 2022, untuk disesuaikan dengan has been ratified (homologation) based on the
Perjanjian Perdamaian yang telah disahkan Commercial Court Decision at
(homologasi) berdasarkan Putusan Pengadilan the Central Jakarta District Court No.
Niaga pada Pengadilan Negeri Jakarta Pusat No. 497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT .PST
497/Pdt.Sus-PKPU/2021/PN. NIAGA.JKT.PST dated 28 June 2022, which was then stated in
tanggal 28 Juni 2022, yang kemudian dituangkan Notarial Deed No 37 dated November 29, 2023
dalam Akta Notaris No 37 tanggal 29 November from Notary Dewantari Handayani, S.H., M.PA.,
2023 dari Notaris Dewantari Handayani, S.H., concerning Amendment II to the Agreement
M.PA., mengenai Perubahan II Perjanjian Trustee of Waskita Concrete Precast I
Perwaliamanatan Obligasi Wajib Konversi Mandatory Convertible Bonds in 2023.
Waskita Beton Precast I Tahun 2023.
Selanjutnya, berdasarkan pengumuman dari Furthermore, based on the Indonesian Stock
Bursa Efek Indonesia No. Peng-P- Exchange announcement No. Peng-P-
01325/BEI.PP3/12/2023 tanggal 12 Desember 01325/BEI.PP3/12/2023 dated 12 December
2023 perihal Pencatatan Obligasi Wajib Konversi 2023 concerning the Listing of Waskita Beton
- 16 -
Page 14
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Waskita Beton Precast I Tahun 2023 dan Precast Mandatory Convertible Bonds I in 2023
Obligasi Wajib Konversi Waskita Beton Precast II and Mandatory Convertible Bonds of PT Waskita
Tahun 2023 PT Waskita Beton Precast Tbk. Beton Precast II in 2023 Prakerja Tbk. (WSBP),
(WSBP), Obligasi Wajib Konversi Waskita Beton Waskita Beton Precast Mandatory Convertible
Precast I Tahun 2023 (WSBP01CB) dan Obligasi Bonds I of 2023 (WSBP01CB) and Waskita
Wajib Konversi Waskita Beton Precast II Tahun Beton Precast Mandatory Convertible Bonds II of
2023 (WSBP02CB), telah dicatatkan di Bursa 2023 (WSBP02CB), were listed on the Stock
tanggal 13 Desember 2023. Exchange on December 13, 2023.
Obligasi Berkelanjutan I Tahap II Tahun 2019 Sustainable Bonds I Phase II 2019
Berdasarkan RUPO Berkelanjutan I Tahap II Based on the Sustainable RUPO I Phase II of
Tahun 2019 tanggal 15 Februari 2023, Para 2019 dated February 15, 2023, the Bondholders
Pemegang Obligasi menyetujui dan memberikan approved and authorized PT Bank Mega Tbk as
kuasa kepada PT Bank Mega Tbk selaku Wali Trustee of the Waskita Beton Precast
Amanat Obligasi Berkelanjutan I Waskita Beton Continuous Bond I Phase II of 2022 to make and
Precast Tahap II Tahun 2022 untuk membuat sign the Trustee Agreement for Waskita Beton
dan menandatangani Perjanjian Perwaliamatan Precast Mandatory Convertible Bond II In 2022,
Obligasi Wajib Konversi Waskita Beton Precast I it will be adjusted to the Peace Agreement which
Tahun 2022, untuk disesuaikan dengan has been ratified (homologation) based on the
Perjanjian Perdamaian yang telah disahkan Commercial Court Decision at
(homologasi) berdasarkan Putusan Pengadilan the Central Jakarta District Court No.
Niaga pada Pengadilan Negeri Jakarta Pusat No. 497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT .PST
497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT.PST dated June 28, 2022, which was then stated in
tanggal 28 Juni 2022, yang kemudian dituangkan Notarial Deed No. 40 dated November 29, 2023
dalam Akta Notaris No. 40 tanggal 29 November from Notary Dewantari Handayani, S.H., M.PA.,
2023 dari Notaris Dewantari Handayani, S.H., concerning Amendment II to the Agreement
MPA, mengenai Perubahan II Perjanjian Trustee of Waskita Beton Precast II Mandatory
Perwaliamanatan Obligasi Wajib Konversi Convertible Bonds in 2023.
Waskita Beton Precast II Tahun 2023.
Selanjutnya, berdasarkan pengumuman dari Furthermore, based on the Indonesian Stock
Bursa Efek Indonesia No. Peng-P- Exchange announcement No. Peng-P-
01325/BEI.PP3/12/2023 tanggal 12 Desember 01325/BEI.PP3/12/2023 dated 12 December
2023 perihal Pencatatan Obligasi Wajib Konversi 2023 concerning the Listing of Waskita Beton
Waskita Beton Precast II Tahun 2023 PT Waskita Precast Mandatory Convertible Bonds II in 2023
Beton Precast Tbk. (WSBP), Obligasi Wajib of PT Waskita Beton Precast II in 2023 (WSBP),
Konversi Waskita Beton Precast II Tahun 2023 Waskita Beton Precast Mandatory Convertible
(WSBP02CB), telah dicatatkan di Bursa tanggal Bonds II of 2023 (WSBP02CB) were listed on the
13 Desember 2023. Lihat catatan 31 dan 38 Stock Exchange on December 13, 2023. See
notes 31 and 38
e. Pengurus dan Struktur Organisasi e. Management and Organization Structure of
Perusahaan the Company
cc. Pengurus Perusahaan Management of the Company
Berdasarkan akta notaris No. 20 tanggal According to the notarial deed No. 20 dated
14 Desember 2023 yang dibuat dihadapan December 14, 2023 of notary Ashoya Ratam,
notaris Ashoya Ratam, S.H., M.Kn., menetapkan S.H., M.Kn., appointed 6 (six) directors of
6 (enam) anggota direksi Perusahaan yaitu the Company consisting of a president director
seorang direktur utama dan 5 (lima) direktur. and 5 (five) directors.
Susunan pengurus Dewan Komisaris dan Direksi The composition of the Company’s Boards of
Perusahaan pada tanggal 31 Maret 2024 dan 31 Commissioners and Directors as of March 31,
Desember 2023 adalah sebagai berikut: 2024 and December 31, 2023 is as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Komisaris Utama/ Independen Heru Winarko Heru Winarko President/ Independent Commissioner
Komisaris Independen Muradi Muradi Independent Commissioners
Muhammad Salim Muhammad Salim
Addin Jauharudin Addin Jauharudin
Komisaris T Iskandar T Iskandar Commissioners
Dedi Syarif Usman Dedi Syarif Usman
- 17 -
Page 15
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Direktur Utama Muhammad Hanugroho Muhammad Hanugroho President Director
Direktur Ratna Ningrum Ratna Ningrum Directors
Wiwi Suprihatno Wiwi Suprihatno
Rudi Purnomo Rudi Purnomo
I Ketut Pasek Senjaya Putra I Ketut Pasek Senjaya Putra
Dhetik Ariyanto Dhetik Ariyanto
Jumlah remunerasi yang diterima oleh Dewan Total remuneration received by the Board of
Komisaris untuk periode – periode tiga bulan yang Commissioners for the three months period March
berakhir 31 Maret 2024 dan 2023 masing-masing 31, 2024 and 2023 amounting to Rp3,273,614,370
sebesar Rp3.273.614.370 dan Rp3.457.533.352. and Rp3,457,533,352 respectively.
Jumlah remunerasi yang diterima oleh Direksi untuk The total remuneration received by the Directors for
periode – periode tiga bulan yang berakhir 31 Maret the three months period March 31, 2024 and 2023
2024 dan 2023 masing - masing sebesar amounting to Rp6,151,054,310 and
Rp6.151.054.310 dan Rp6.285.336.204. Rp6,285,336,204 respectively.
Perusahaan dan entitas anak (Grup) memiliki The Company and its subsidiaries (Group) has an
karyawan tetap (tidak diaudit) masing-masing average number of 2,361 and 2,857 employees
sebesar 2.255 dan 2.361 orang pada tanggal (unaudited) as of March 31, 2024 and December, 31
31 Maret 2024 dan 31 Desember 2023. 2023, respectively.
Komite Audit Audit Committee
Komite Audit Perusahaan diberhentikan dan diangkat The Company’s Audit Committee was dismissed and
melalui surat keputusan Dewan Direksi No. appointed through the Decree of the Board of
02/SK/WK/PEN/2024 tanggal 24 Januari 2024 Directors No. 02/SK/WK/PEN/2024 dated January
mengenai Pemberhentian dan Pengangkatan 24, 2024 regarding the Dismissal and Appointment of
Anggota Komite Audit Audit Committee Members of
PT Waskita Karya (Persero) Tbk. PT Waskita Karya (Persero) Tbk
Susunan Komite Audit Perusahaan pada tanggal 31 The composition of the Company’s Audit Committee
Maret 2024 dan 31 Desember 2023 adalah sebagai as of March 31, 2024 and December,31 2023 are as
berikut: follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Ketua Muhammad Salim Muhammad Salim Head
Anggota Muradi Djoko Wibowo Members
Djoko Wibowo Prayudhi P Kesuma
Subagio Muradi
Komite Pemantau Manajemen Risiko Risk Management Monitoring Comittee
Komite Pemantau Manajemen Risiko diangkat The Risk Management Monitoring Committee was
melalui surat keputusan Dewan Komisaris appointed through the decision letter of
No. 17/SK/WK/DK/2023 tanggal 24 Oktober 2023 the Board of Commissioners No. 17/SK/WK/DK/2023
mengenai Perubahan Keanggotaan Komite dated October 24, 2023 regarding the Changes in the
Pemantau Manajemen Risiko. Member of the Risk Management Monitoring Committee.
Susunan Komite Pemantau Manajemen Risiko The composition of the Company’s Risk Management
Perusahaan pada tanggal 31 Maret 2024 dan 31 Monitoring Committee as of March 31, 2024 and
Desember 2023 adalah sebagai berikut: December, 31 2023 are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Ketua T. Iskandar T. Iskandar Head
Anggota Dedi Syarif Usman Dedi Syarif Usman Members
Dedy Gunawan Dedy Gunawan
Addin Jauharudin Addin Jauharudin
Mohamad Nasir Mohamad Nasir
Komite Nominasi dan Renumerasi Nomination and Renumeration Comittee
Komite Nominasi dan Remunerasi diangkat The Nomination and Remuneration Committee
melalui surat keputusan Dewan was appointed through the decision
Komisaris No. 21/SK/WK/DK/2023 tanggal letter of the Board of Commissioners
- 18 -
Page 16
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
12 Desember 2023 mengenai Pemberhentian No. 21/SK/WK/DK/2021 dated December 12,
dan Pengangkatan Anggota Nominasi dan 2023 regarding the Dismissal and Appointment of
Remunerasi. Members of the Nomination and Remuneration
Committee.
Susunan Komite Nominasi dan Remunerasi The composition of the Company’s Nomination
Perusahaan pada tanggal 31 Maret 2024 dan 31 and Remuneration Committee as of March 31,
Desember 2023 adalah sebagai berikut: 2024 and December 31, 2023 are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Ketua Heru Winarko Heru Winarko Head
Anggota Zamroni Zamroni Members
Addin Jauharudin Addin Jauharudin
Struktur Organisasi Organization Structure
Wilayah kerja Perusahaan ditentukan The Company’s work areas are according to
berdasarkan Surat Keputusan Direksi the Decision Letter of Directors No.
No. 11/SK/WK/2023 tanggal 28 Maret 2023 11/SK/WK/2023 dated March 28, 2023
tentang Perubahan Struktur Organisasi concerning Changes in the Organizational
Perusahaan. Unit bisnis memiliki 5 (lima) divisi, Structure of the Company. The business unit
sebagai berikut: have 5 (five) divisions, as follows:
Unit Bisnis/ Wilayah Operasi/ Kedudukan/
Business Unit Work Areas Location
Divisi Gedung/ Jakarta
Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan
Building Division
melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
untuk pekerjaan proyek gedung, bandara, Light Rail Transit (LRT), jalur kereta api,
pengembangan kawasan, dan lain-lain termasuk proyek-proyek investasi dan
pengembangan terpilih yang ditetapkan Direksi dengan nilai kontrak > Rp 100 Miliar.
Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
its activities in marketing to production for the entire building project for the works of
buildings, airports, Light Rail Transit (LRT), railway, area development, and others as
well as selected investment and development projects established by the Board of
Directors with contract value > Rp 100 Billion.
Divisi Infrastruktur I/ Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan Jakarta
Infrastructure I Division melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
untuk pekerjaan proyek-proyek infrastruktur sipil non jalan dan jembatan seperti
bendungan, irigasi, bangunan air, pelabuhan, dermaga, pengaman pantai dan lain-lain
termasuk proyek-proyek investasi dan pengembangan terpilih yang ditetapkan oleh
Direksi dengan nilai kontrak > Rp 100 Miliar.
Operational area covers the whole are of Indonesia, domiciled in Jakarta to perform its
activities in marketing to production for non-road and bridge civil infrastructure
projects, such as dams, irrigation, water building, port, piers, revetment and others as
well as selected investment and development projects established by the Board of
Directors with contract value > Rp 100 Billion.
Divisi Infrastruktur II/ Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan Jakarta
Infrastructure II Division melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
untuk pekerjaan proyek-proyek infratruktur sipil jalan dan jembatan termasuk proyek-
proyek investasi dan pengembangan terpilih yang ditetapkan oleh Direksi dengan nilai
kontrak > Rp 100 Miliar.
Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
its activities in marketing to production for road and bridge civil infrastructure projects
such as road including selected investment and development projects established by
the Board of Directors with contract value > Rp 100 Billion.
Divisi Infrastruktur III/ Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan Jakarta
Infra III Division melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
untuk pekerjaan proyek-proyek EPC seperti power plant, industrial plant, smelter,
transmisi-distribusi air, sewerage, sistem penyedia air minum, oil dan gas, dan lain-lain
termasuk proyek-proyek investasi dan pengembangan terpilih yang ditetapkan oleh
Direksi, dengan dengan nilai kontrak > Rp 100 Miliar.
- 19 -
Page 17
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Unit Bisnis/ Wilayah Operasi/ Kedudukan/
Business Unit Work Areas Location
Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
its activities in marketing to production for EPC projects such as power plant, industrial
plant, smelter, transmission-distribution of water, sewerage, drinking water distribution
system, oil and gas, and others as well as selected investment and development
projects established by the Board of Directors, with with contract value > Rp 100
Billion.
Divisi Luar Negeri/ Daerah operasional luar negeri meliputi Middle East Asia, South East Asia, South Asia , Jakarta
Overseas Division dan Africa , berkedudukan di Jakarta dengan melaksanakan kegiatan Perusahaan dalam
bidang pemasaran sampai dengan produksi untuk pekerjaan proyek-proyek di luar
negeri baik gedung, infrastruktur dan EPC termasuk proyek-proyek investasi dan
pengembangan terpilih yang ditetapkan oleh Direksi, dengan tidak ada batasan nilai
kontrak.
Operational area covers overseas such as Middle East Asia, South East Asia, South
Asia, and Africa, domiciled in Jakarta to perform its activities in marketing to
production for pojects in overseas include building, infrastructure, and EPC including
selected investment and development projects established by the Board of Directors,
with no contract restriction.
f. Sekretaris Perusahaan f. Corporate Secretary
Corporate Secretary Perusahaan diangkat The Company’s Corporate Secretary was
melalui surat keputusan Dewan Direksi appointed throuh the decision letter of the Board
No. 14/SK/WK/PEN/2023 tanggal 19 Januari of Directors No. 14/SK/WK/PEN/2023 dated
2023 mengenai Pemberhentian dan January 19, 2023 regarding the Dismissal and
Pengangkatan Pejabat Struktural. Perusahaan Appointment of Structural Officials.
menetapkan Ny. Ermy Puspa Yunita sebagai The Company appointed Mrs. Ermy Puspa
sekretaris Perusahaan. Yunita as corporate secretary.
g. Audit Internal g. Internal Audit
Internal Audit Perusahaan diangkat melalui surat The Company’s Internal Audit was appointed
keputusan Dewan Direksi No. through the decision letter of the Board of Directors
14/SK/WK/PEN/2023 tanggal 19 Januari 2023 No. 14/SK/WK/PEN/2023 dated January 19, 2023
mengenai Pemberhentian dan Pengangkatan regarding the Dismissal and Appointment of
Pejabat Struktural. Perusahaan menetapkan Tn. Structural Officials. The Company appointed Mr. AS
AS Wisnu Wijayanto sebagai Senior Vice Wisnu Wijayanto as the Company's Senior Vice
President Internal Audit Perusahaan. President of Internal Audit.
h. Entitas Anak yang dikonsolidasi h. Consolidated Subsidiaries
Sebelum Eliminasi/ Before Elimination
31 Maret / March 31, 2024
Persentase Jumlah Laba
Kepemilikan/ (Rugi) Bersih
Percentage Periode Berjalan/
of Jumlah Aset/ Total Net Income (Loss)
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownerships Total Assets for the Year
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Rp Rp
PT Waskita Toll Road Jakarta Jalan Tol/ Toll Road 2014 92,53 60.390.951.841.975 (73.273.875.950)
PT Waskita Beton Precast Tbk Jakarta Industri Pabrikasi/ 2014 29,36 4.364.801.905.402 (126.004.857.348)
Fabrication
PT Waskita Karya Realty Jakarta Properti/ Property 2015 99,99 6.154.640.809.600 (35.342.591.218)
PT Waskita Karya Infrastruktur Jakarta Industri Pabrikasi dan 2016 99,99 673.238.961.861 (19.008.936.248)
Investasi/ Fabrication and
Investment
Sebelum Eliminasi/ Before Elimination
31 Maret / March 31, 2024
Persentase Jumlah Laba
Kepemilikan/ (Rugi) Bersih
Percentage Periode Berjalan/
of Jumlah Aset/ Total Net Income (Loss)
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownerships Total Assets for the Year
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Rp Rp
PT Waskita Sangir Energi Jakarta Energi/ Energy 2016 94,70 271.008.133.934 (12.271.357.287)
PT Waskita Wado Energi Jakarta Energi/ Energy Dalam Tahap Pengembangan/ 99,99 34.872.926.348 236.406
Development Stage
- 20 -
Page 18
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Sebelum Eliminasi/ Before Elimination
31 Maret / March 31, 2024
Persentase Jumlah Laba
Kepemilikan/ (Rugi) Bersih
Percentage Periode Berjalan/
of Jumlah Aset/ Total Net Income (Loss)
Entitas Anak/ Domisili/ Jenis Usaha/ Tahun Operasi Komersial/ Ownerships Total Assets for the Year
Subsidiaries Domiciled Nature of Business Start of Commercial Operations % Rp Rp
PT Pemalang Batang Toll Road Jakarta Jalan Tol/ Toll Road 2018 60,00 7.582.927.461.797 (52.262.377.029)
PT Waskita Sriwijaya Tol Palembang Jalan Tol/ Toll Road 2020 99,69 18.324.138.511.124 (21.924.475.582)
PT Waskita Bumi Wira Gresik Jalan Tol/ Toll Road 2020 99,92 12.065.288.867.200 (155.968.801.412)
PT Waskita Transjawa Toll Road Jakarta Jalan Tol/ Toll Road 2015 88,08 9.039.861.641.113 (5.070.655.224)
PT Transjawa Paspro jalan Tol Jakarta Jalan Tol/ Toll Road 2019 99,99 5.822.176.138.647 (87.631.481.353)
PT Tol Teluk Balikpapan Balikpapan Jalan Tol/ Toll Road Dalam Tahap Pengembangan/ 33.927.547.151 (71.051)
60,00
Development Stage
PT Waskita Fim Perkasa Realti Jakarta Properti/ Property 2018 90,00 1.315.444.284.798 206.821.833
PT Waskita Modern Realty Jakarta Properti/ Property 2018 60,00 483.265.249.585 (2.564.194.410)
PT Waskita Toll Road (WTR) PT Waskita Toll Road (WTR)
Pendirian WTR (entitas anak) adalah sesuai The establishment of WTR (subsidiary) was
dengan akta notaris No. 62 tanggal 19 Juni 2014 based on notarial deed No. 62 dated June 19,
dari notaris Fathiah Helmi, S.H. Akta pendirian ini 2014 of notary Fathiah Helmi, S.H. The deed was
telah mendapat persetujuan oleh Menteri Hukum approved by the Minister of Law and Human
dan Hak Asasi Manusia melalui surat keputusan Rights through the decision letter No. AHU-
No. AHU-14734. 40.10.2014 tanggal 25 Juni 14734.40.10. 2014 dated June 25, 2014.
2014.
Anggaran Dasar WTR telah beberapa kali WTR's Articles of Association have been
mengalami perubahan, terakhir berdasarkan amended several times, most recently based on
akta notaris No. 12 tanggal 27 Januari 2023 oleh notarial deed No. 12 dated January 27, 2023 by
Zulkifli Harahap, S.H., dimana Perusahaan Zulkifli Harahap, S.H., wherein the Company
meningkatkan modal ditempatkan dan disetor increased its issued and paid- up capital in WTR
kepada WTR sebesar Rp762.777.735.984 amounting to Rp762,777,735,984 so
sehingga kepemilikan Perusahaan berubah the Company ownership change to 92.53%.
menjadi 92,53%.
Entitas anak yang berada dibawah WTR sebagai The subsidiaries under WTR are as follows:
berikut:
- PT Pemalang Batang Tol Road (PBTR) - PT Pemalang Batang Tol Road (PBTR)
Pendirian PBTR, (kepemilikan tidak The establishment of PBTR, (indirect
langsung melalui WTR) adalah sesuai ownership through WTR) was based on
dengan akta notaris No. 10 tanggal 15 Juni notarial deed No. 10 dated June 15, 2006 of
2006 dari notaris Bonardo Nasution S.H. notary Bonardo Nasution, S.H. The deed
Akta pendirian ini telah mendapat was approved by the Minister of Law and
persetujuan dari Menteri Hukum dan Hak Human Rights through the decision letter
Asasi Manusia melalui surat keputusan No. C-20478 HT.01.01.Tahun 2006 dated
No. C-20478 HT.01.01.Tahun 2006 tanggal July 13, 2006.
13 Juli 2006.
Selanjutnya peralihan pemegang saham The change in ownership of PBTR to WTR
PBTR ke dalam WTR berdasarkan akta was based on notarial deed No. 57 dated
notaris No. 57 tanggal 15 Februari 2016 dari February 15, 2016 of notary Jose Dima
notaris Jose Dima Satria S.H., M.Kn. Akta ini Satria S.H., M.Kn. The deed was approved
telah mendapat persetujuan oleh Menteri by Minister of Law and Human Rights
Hukum dan Hak Asasi Manusia melalui surat through the decision letter No. AHU-
keputusan No. AHU-AH.01.03-0982070. AH.01.03-0982070.
Anggaran Dasar PBTR telah beberapa kali PBTR's Articles of Association has been
mengalami perubahan, terakhir berdasarkan amended several times, most recently by
akta notaris No. 46 tanggal 21 Desember notarial deed No. 46 on December 21, 2018
2018 dari notaris Catur Virgo S.H., M.H., of notary Catur Virgo, S.H., M.H., which has
yang telah disetujui oleh Menteri Hukum dan been approved by the Minister of Law and
Hak Asasi Manusia dengan Surat Keputusan Human Rights through the Decision Letter
No. AHU-0177882.AH.01.11. Tahun 2018 No. AHU-0177882.AH.01.11.Tahun 2018
tanggal 27 Desember 2018. dated December 27, 2018.
- 21 -
Page 19
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
- PT Waskita Sriwijaya Tol (WST) - PT Waskita Sriwijaya Tol (WST)
Pendirian WST (kepemilikan tidak langsung The establishment of WST (indirect
melalui WTR) adalah sesuai dengan akta ownership through WTR) was based on
notaris No. 51 tanggal 18 November 2011 notarial deed No. 51 dated November 18,
dari notaris Ilmiawan Dekrit Supatmo S.H., 2011 of notary Ilmiawan Dekrit Supatmo
M.H. Akta pendirian ini telah mendapat S.H., M.H. This notarial deed was approved
pengesahan Menteri Hukum dan Hak Asasi by the Minister of Law and
Manusia sesuai dengan Surat Keputusan Human Rights through the decision
No. AHU- 56876.A.H.01.01.Tahun 2011 letter No. AHU- 56876.A.H.01.01. Tahun
tanggal 21 November 2011. 2011, dated November 21, 2011.
Anggaran Dasar WST telah beberapa WST's Articles of Association has been
kali mengalami perubahan, terakhir amended several times, most recently based
berdasarkan Keputusan para pemegang on the decision of the shareholders outside
saham diluar Rapat Umum Pemegang the Extraordinary General Meeting of
Saham Luar Biasa PT WST yang diaktakan Shareholders of PT WST which was
melalui Akta Notaris No. 01 tanggal notarized through Notarial Deed No. 01
2 Oktober 2023 yang dibuat dihadapan Ir. dated October 2, 2023 which was made in
Nanette Cahyanie Handari Adi Warsito S.H., the presence of Ir. Nanette Cahyanie
Notaris di Jakarta. Bahwa WTR selaku Handari Adi Warsito S.H., Notary in Jakarta.
pemegang saham mayoritas menyetujui That WTR as the majority shareholder has
rencana penggunaan dan peningkatan approved the plan to use and increase
modal ditempatkan dan disetor sebesar issued and paid-up capital amounting to
Rp300.160.000.000. Akta ini telah mendapat Rp300,160,000,000. This deed has been
persetujuan oleh Menteri Hukum dan Hak approved by the Minister of Law and Human
Asasi Manusia Republik Indonesia melalui Rights of the Republic of Indonesia through
surat No. AHU-AH.01.03-0126850 tanggal 9 letter No. AHU-AH.01.03-0126850 dated
Oktober 2023. October 9, 2023.
- PT Waskita Bumi Wira (WBW) - PT Waskita Bumi Wira (WBW)
WBW (kepemilikan tidak langsung melalui WBW (indirect ownership through WTR) was
WTR) didirikan berdasarkan Akta No. 48 established based on Deed No. 48 dated
tanggal 20 Agustus 2014 oleh Jose Dima August 20, 2014 by Jose Dima Satria, S.H.,
Satria, S.H., M.Kn., Notaris di Jakarta, dan M.Kn., Notary in Jakarta, and
telah medapatkan pengesahan dari has been approved by the Minister of Law
Menteri Hukum dan dan Hak Asasi and Human Rights through decision
Manusia sesuai dengan Surat letter No. AHU-22261.40.10.2014, dated
Keputusan No. AHU-22261.40.10.2014, August 28, 2014.
tanggal 28 Agustus 2014.
WTR memiliki penyertaan sebesar 48% atas WTR had an initial ownership interest of 48%
modal disetor WBW (kepemilikan tidak on the paid up capital of WBW (indirect
langsung melalui WTR) atau sebesar ownership through WTR) amounting to
Rp7.500.000.000, berdasarkan akta notaris Rp7,500,000,000, based on the notarial
Jose Dima Satria, S.H., M.Kn., No. 43 deed of Jose Dima Satria, S.H., M.Kn.,
tanggal 28 Oktober 2014. No. 43 dated October 28, 2014.
Anggaran Dasar WBW telah beberapa kali WBW's Articles of Association has been
mengalami perubahan, terakhir berdasarkan amended several times, most recently based
Keputusan para pemegang saham diluar on the decision of the shareholders outside
Rapat Umum Pemegang Saham Luar Biasa the Extraordinary General Meeting of
WBW yang diaktakan melalui Akta Notaris Shareholders of WBW which was notarized
No. 28 tanggal 20 Desember 2023 yang through Notary Deed No. 28 dated
dibuat dihadapan Ir. Nanette Cahyanie December 20, 2023 by Ir. Nanette Cahyanie
Handari Adi Warsito S.H., Notaris di Jakarta. Handari Adi Warsito S.H., Notary in Jakarta.
Mengenai peningkatan modal ditempatkan About to increase the issued and paid-up
dan disetor yang akan digunakan untuk capital which will be used for
pembangunan jalan tol Krian-Legundi- the construction of the Krian-Legundi-
Bunder-Manyar. Bunder-Manyar toll road.
- 22 -
Page 20
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
- PT Tol Teluk Balikpapan (TTB) - PT Tol Teluk Balikpapan (TTB)
Pendirian TTB (kepemilikan tidak langsung The establishment of TTB (indirect
melalui WTR) adalah sesuai dengan akta ownership through WTR) was based on
notaris No. 42 tanggal 16 September 2016 notarial deed No. 42 dated September 16,
dari notaris Yeti Liana, S.Psi., S.H., M.Kn., 2016 of notary Yeti Liana, S. Psi., S.H.,
Akta pendirian ini telah mendapat M.Kn., The deed of establishment was
persetujuan oleh Menteri Hukum dan Hak approved by the Minister of Law and Human
Asasi Manusia melalui surat keputusan Rights through the decision letter dated
tanggal 21 September 2016 No. AHU- September 21, 2016 No. AHU-
0041732.AH.01.01.Tahun 2016. WTR, 0041732.AH.01.01.Tahun 2016. WTR, a
entitas anak, memiliki penyertaan sebesar subsidiary, holds a 60% interest in TTB or
60% pada TTB atau setara equivalent to Rp12,000,000,000.
Rp12.000.000.000.
Anggaran Dasar Perusahaan telah TTB Articles of Association has been
beberapa kali mengalami perubahan, amended several times, most recently by
terakhir berdasarkan akta notaris No. 27 the notarial deed No. 27 dated September
tanggal 18 September 2019 dari notaris Ir. 18, 2019 of Ir. Nanette C.H. Adi Warsito,
Nanette C.H. Adi Warsito, S.H., yang telah S.H., which has been approved
disetujui oleh Menteri Hukum dan Hak Asasi by the Minister of Law and Human Rights
Manusia dengan Surat Keputusan No. AHU- through the Decision Letter
0072820. AH.01.02.Tahun 2019 tanggal 20 No. AHU-0072 820.AH.01.02.Tahun 2019
September 2019. Perubahan yang dimaksud dated September 20, 2019. The changes
antara lain terkait perubahan ketentuan referred to amongothers related to
Pasal 3 ayat 2 yakni terkait maksud dan changes in the provisions of Article 3
tujuan serta kegiatan usaha Perusahaan. paragraph 2 related to the TTB's purpose
and objectives and business activities.
- PT Waskita Transjawa Toll Road (WTTR) - PT Waskita Transjawa Toll Road (WTTR)
Pendirian PT Waskita MNC Transjawa Toll The establishment of PT Waskita MNC
Road (kepemilikan tidak langsung melalui Transjawa Toll Road (indirect ownership
WTR) adalah sesuai dengan akta notaris through WTR) was based on notarial deed
Fathiah Helmi, S.H., No. 25 tanggal No. 25 dated September 28, 2015 of notary
28 September 2015. Akta pendirian ini telah Fathiah Helmi, S.H., This notarial deed has
mendapat pengesahan Menteri Hukum dan been approved by The Minister of Law and
Hak Asasi Manusia sesuai dengan Human Rights through decision
Surat Keputusan No. AHU-2458481.AH.01. letter No. AHU-2458481.AH.01.01.TH.2015
01.TH.2015 tanggal 29 September 2015. dated September 29, 2015.
No. AHU-2458481. AH.01.01.TH.2015
tanggal 29 September 2015.
Berdasarkan akta notaris Catur Virgo, S.H., Based on notarial deed Catur Virgo, S.H.,
M.H., No. 32 tanggal 27 Mei 2016 telah M.H., No. 32 dated May 27, 2016 changed
disetujui perubahan nama dari “PT Waskita the name of “PT Waskita MNC Transjawa
MNC Transjawa Toll Road” menjadi Toll Road” into “PT Waskita Transjawa Toll
“PT Waskita Transjawa Toll Road”. Akta Road”. The deed was approved by
tersebut telah disahkan oleh Menteri Hukum the Minister of Law and Human Rights
dan Hak Asasi Manusia dalam surat through decision letter No. AHU-AH.01.03-
keputusan No. AHU-AH.01.03-005.3.001 005.3.001 dated May 31, 2016.
tanggal 31 Mei 2016.
Berdasarkan akta notaris No. 23 tanggal 10 Based on notarial deed No. 23 dated April
April 2018 oleh Ir. Nanette Cahyanie Handari 10, 2018 by Ir. Nanette Cahyanie Handari
Adi Warsito, S.H., WTR menjual 57,14% Adi Warsito, S.H., WTR sold its 57.14%
kepemilikan saham di WTTR dengan harga ownership WTTR at a price of
sebesar Rp2.857.143.347.539. Kepemilikan Rp2,857,143,347,539 to Limited Investment
saham WTR di WTTR menjadi sebesar Fund (RDPT). WTR’s share ownership in
42,85% setelah penjualan tersebut. Akta WTTR became 42.85% after the sale of
tersebut telah disahkan oleh Menteri Hukum transaction. The deed was approved by
dan Hak Asasi Manusia dalam Surat the Minister of Law and Human Rights
Keputusan No. AHU-0050658.AH.01.11 through decision letter No. AHU-
tanggal 11 April 2018. 0050658.AH.01.11 dated April 11, 2018.
- 23 -
Page 21
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Berdasarkan akta notaris No. 26 tanggal Based on notarial deed No. 26 dated
11 April 2018 oleh Ir. Nanette Cahyanie April 11, 2018 by Ir. Nanette Cahyanie
Handari Adi Warsito, S.H., kepemilikan Handari Adi Warsito, S.H., WTR’s share
saham WTR di WTTR menjadi sebesar ownership in WTTR became 29.99%.
29,99%. Akta tersebut telah disahkan oleh The deed was approved by the Minister of
Menteri Hukum dan Hak Asasi Manusia Law and Human Rights through decision
dalam Surat Keputusan No. AHU-AH.01.03- letter No. AHU-AH.01.03-0144385 dated
0144385 tanggal 12 April 2018. April 12, 2018.
WTR melakukan Put Option atas WTR performed a Put Option on Shares
Kepemilikan saham di WTTR sebesar Ownership in WTTR of 4.75%, based on
4,75%, sesuai dengan Perjanjian Antar shareholders agreement No. 25 dated
Pemegang Saham No. 25 tanggal 10 April April 10, 2018 Article 6.3 regarding
2018 Pasal 6.3 perihal Pengalihan Saham - the transfer of shares - Put Option and Call
Put Option dan Call Option sebesar Option amounting to Rp420,070,567,530,
Rp420.070.567.530, kepemilikan saham there by WTR’s share ownership in WTTR
WTR di WTTR menjadi sebesar 34,75%. became 34.75%.
WTR melakukan Put Option Tahun II atas WTR performed a Put Option Tahun II on
Kepemilikan saham di WTTR sebesar Shares Ownership in WTTR of 4.75%, based
4,75%, sesuai dengan Akta Notaris No. 01 on Notarial Deed No. 1 dated April 1, 2020 of
tanggal 1 April 2020 dari Notaris Ir. Nanette Notar Ir. Nanette C.H. Adi Warsito, S.H.
C.H. Adi Warsito, S.H. sebesar amounting to Rp467,433,619,437, WTR’s
Rp467.433.619.437, kepemilikan saham share ownership in WTTR became 39.10%.
WTR di WTTR menjadi sebesar 39,10%.
Berdasarkan Dokumen Berita Acara Rapat Based on the Minutes of the General
Umum Pemegang Unit Penyertaan Terbatas Meeting of the Holders of the Trans Java
Ekuitas Danareksa Infrastruktur Trans Jawa Infrastructure Limited Equity Participation
No. 89 tanggal 27 Juli 2022, Group Unit No. 89 dated July 27, 2022, the Group
melakukan pelunasan secara bertahap paid off the unit ownership in stages
kepemilikan unit sebesar amounting to Rp5,256,112,000,000 or
Rp5.256.112.000.000 atau setara dengan equivalent to 80.2% share ownership of
80,2% kepemilikan saham RDPT di WTTR RDPT in WTTR which was implemented on
yang dilaksanakan pada 30 Agustus 2022. August 30, 2022. On this basis, WTR
atas dasar tersebut, WTR telah has controlled the WTTR which was
mengendalikan WTTR yang semula previously controlled by the RDPT.
dikendalikan oleh RDPT. Sehingga WTTR Accordingly WTTR is consolidated as of
terkonsolidasi per 31 Agustus 2022. August 31, 2022. WTR will buy
Perusahaan akan membeli sisa unit the remaining RDPT participation units when
penyertaan RDPT apabila sudah memiliki it has available funds.
ketersediaan dana.
Berdasarkan pernyataan keputusan para Based on the statement of decisions of
pemegang saham diluar Rapat Umum the shareholders outside the Extraordinary
Pemegang Saham Luar Biasa PT Waskita General Meeting of Shareholders of
Toll Road yang diaktakan melalui Akta PT Waskita Toll Road which was notarized
Notaris No. 60 tanggal 26 Agustus 2022 through Deed No. 60 dated 26 August 2022
yang dibuat dihadapan Ir. Nanette Cahyanie made before Ir. Nanette Cahyanie Handari
Handari Adi Warsito, S.H., Notaris di Adi Warsito, S.H., Notary in Jakarta.
Jakarta. Bahwa para pemegang saham Whereas the shareholders agreed to
menyetujui tindakan WTR untuk the WTR's action to carry out the Call Option
melaksanakan Call Option saham RDPT di for RDPT shares in PT WTTR through the
PT WTTR melalui mekanisme pembelian mechanism of purchasing an investment unit
unit penyertaan dengan harga sebesar at a price of Rp6,546,570,473,856.
Rp6.546.570.473.856. Dengan demikian, Accordingly, WTR’s ownership in WTTR
kepemilikan WTR di WTTR meningkat increased to 88.08%.
menjadi sebesar 88,08%.
- PT Transjawa Paspro Jalan Tol (TJPJT) - PT Transjawa Paspro Jalan Tol (TJPJT)
Pendirian TJPJT (kepemilikan tidak The establishment of TJPJT (indirect
langsung melalui WTR) sesuai dengan Akta ownership through WTR) was based on
Notaris No. 22 tanggal 21 Mei 2007 oleh Notarial Deed No.22 dated May 21, 2007 by
- 24 -
Page 22
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Humberg Lie, S.H., M.Kn., Akta pendirian ini Humberg Lie, S.H, M.Kn., The Deed of
telah mendapat persetujuan oleh Menteri established was approved by the Minister of
Hukum dan Hak Asasi Manusia melalui Law and Human Rights through Decision
Surat Keputusan No. W29-01201HT.01.01- Letter No. W29-01201HT.01.01-TH.2007.
TH.2007.
Akuisisi dari TPJT oleh WTTR sesuai Acquisition of TPJT by WTTR is in
dengan akta notaris No. 135 tanggal 28 accordance with the deed No. 135 of
September 2015 dari notaris Humberg Lie, September 28, 2015 of notary Humberg Lie,
S.H., M.Kn., Akta ini telah mendapat S.H., M.Kn., This deed was approved by
persetujuan oleh Menteri Hukum dan Hak The Minister of Law and Human
Asasi Manusia melalui No. AHU-AH.01.03- Rightsthrough its letter No. AHU - AH.01.03-
0969717. 0969717.
Perjanjian Pengusahaan Jalan Tol ruas The Concession Agreements for Pasuruan -
Pasuruan - Probolinggo telah mengalami Probolinggo Toll Road have been amended,
perubahan, berdasarkan Akta Notaris No. 8 by notarial deed No. 8 dated February 18,
tanggal 18 Februari 2020 oleh Rina Utami 2020 by Rina Utami Djauhari S.H., notary in
Djauhari S.H., notaris di Jakarta, terdapat Jakarta, the concession period for Pasuruan
perubahan masa konsesi atas ruas tol - Probolinggo toll road becomes 50 years,
Pasuruan - Probolinggo menjadi 50 tahun, most recent by Notarial Deed No. 16 dated
terakhir berdasarkan Akta Notaris No. 16 June 18, 2021 by Rina Utami Djauhari S.H.,
tanggal 18 Juni 2021 oleh Rina Utami Notary in Jakarta. In the most recent
Djauhari S.H., Notaris di Jakarta. Pada amendment, the principal payment period for
perubahan terakhirnya, masa pembayaran land acquisition by the Company for
pokok dana pengadaan tanah oleh the Pasuruan - Probolinggo toll road was
Perusahaan atas ruas tol Pasuruan - adjusted because it passed the time limit
Probolinggo disesuaikan karena telah determined by the previous Toll Road
melewati Batasan waktu yang ditentukan Concession Agreement.
oleh Perjanjian Pengusahaan Jalan Tol
sebelumnya.
PT Waskita Beton Precast Tbk (WBP) PT Waskita Beton Precast Tbk (WBP)
PT Waskita Beton Precast Tbk (Entitas Anak) PT Waskita Beton Precast Tbk (Subsidiary) was
didirikan berdasarkan Akta No. 10 tanggal established based on notarial deed No. 10 dated
7 Oktober 2014 dari Fathiah Helmi, S.H., notaris October 7, 2014 by Fathiah Helmi, S.H., public
publik di Jakarta dan telah mendapat notary in Jakarta, and has been approved by
pengesahan dari Menteri Hukum dan Hak Asasi the Minister of Law and Human Rights of the
Manusia Republik Indonesia melalui surat Republic of Indonesia through his decision letter
keputusan No. AHU-29347.40.10.2014 tanggal No. AHU-29347.40.10.2014 dated October 14,
14 Oktober 2014 serta diumumkan dalam Berita 2014 and was published in the State Gazette of
Negara Republik Indonesia No. 60221 the Republic of Indonesia No. 60221 Supplement
Tambahan No. 103 tanggal 26 Desember 2014. No. 103 dated December 26, 2014.
Anggaran Dasar WBP telah beberapa kali WBP’s Articles of Association had been
mengalami perubahan, terakhir berdasarkan amended several times, most recently based on
Akta Pernyataan Keputusan Rapat Umum the Extraordinary General Meeting’ of
Pemegang Saham Luar Biasa No. 16 tanggal 10 Shareholders’ Deed of Decision No. 16 dated
Agustus 2023 dari Ashoya Ratam S.H., M.Kn., August 10, 2023 by Ashoya Ratam S.H., M.Kn.,
Akta ini telah mendapat pengesahan dari This deed has been approved by the Minister of
Kementerian Hukum dan Hak Asasi Manusia Law and Human Rights of the Republic of
Republik Indonesia dengan surat Indonesia based on Decree No. AHU-AH.01.03-
No. AHU-AH.01.03-0109371 tanggal 22 Agustus 0109371 dated August 22, 2023.
2023. Amendemen tersebut terkait atas The amendment is related to the approval of
persetujuan konversi utang WBP menjadi ekuitas the conversion of WBP's debt into equity to
kepada kreditur tertentu sesuai dengan certain creditors in accordance with
ketentuan dalam perjanjian perdamaian; the provisions of the peace agreement; Approval
Persetujuan peningkatan modal dasar dan of increasing the authorized and paid-up capital
disetor WBP tanpa melalui penerbitan seri of WBP without pre-emptive rights (PMTHMETD)
saham baru dalam rangka implementasi atas through the issuance of a new series of shares in
ketentuan dalam Perjanjian Perdamaian; dan the context of implementing the provisions of the
Persetujuan Perubahan Anggaran Dasar WBP, Peace Agreement; and Approval of changes to
- 25 -
Page 23
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
sehingga kepemilikan Perusahaan berubah WBP's Articles of Association, so that the
menjadi 29,359%. Company's ownership changes to 29.359%.
Berdasarkan Akta Pernyataan Keputusan Rapat Based on the Deed of Extraordinary General
Umum Pemegang Saham Luar Biasa No. 60 Meeting of Shareholders Decision Statement
tanggal 28 Juli 2023 dan No. 16 tanggal 10 No. 60 dated July 28, 2023 and No. 16 dated
Agustus 2023 dari Ashoya Ratam S.H., M.Kn., August 10, 2023 from Ashoya Ratam S.H.,
Perusahaan memiliki 1 lembar saham seri A M.Kn., The Company has 1 series A share which
yang dimiliki khusus oleh Perusahaan yang is owned specifically by the Company which
memberikan kepada pemegangnya hak gives its holder special rights, which Series B and
istimewa, yang tidak dimiliki oleh Pemegang Series C Shareholders do not have.
Saham Seri B dan Seri C.
Hak istimewa tersebut adalah bahwa Rapat This privilege is that the General Meeting of
Umum Pemegang Saham (RUPS) hanya dapat Shareholders (GMS) can only be held and make
dilaksanakan dan mengabil keputusan yang sah legal dan binding decisions if attended and
dan mengikat apabila dihadiri dan disetujui oleh approved by the Series A Shareholders.
Pemegang Saham.
PT Waskita Karya Realty (WKR) PT Waskita Karya Realty (WKR)
Pendirian WKR (entitas anak) adalah sesuai The establishment of WKR (subsidiary) was
dengan akta notaris No. 27 tanggal based on notarial deed No. 27 dated October 16,
16 Oktober 2014 dari notaris Fathiah Helmi, S.H., 2014 of notary Fathiah Helmi, S.H.,
Akta pendirian ini telah mendapat persetujuan The deed was approved by the Minister of Law
oleh Menteri Hukum dan Hak and Human Rights through the decision letter
Asasi Manusia melalui surat keputusan No. AHU-54929.AH.01.02 dated October 23,
No. AHU-54929.AH.01.02, tanggal 23 Oktober 2014.
2014.
Anggaran Dasar WKR telah mengalami WKR's Articles of Association has been
beberapa kali perubahan, terakhir dengan akta amended for several times, most recently by the
No. 9 tanggal 19 April 2022 dari Vita Cahyojati, notarial deed No. 9 on April 19, 2022 of notary
S.H. M.H., Notaris di Jakarta, tentang pernyataan Vita Cahyojati, S.H. M.H., about the statement of
keputusan para pemegang saham. Akta shareholders decision. Which has been
perubahan ini telah memperoleh persetujuan dari approved by the Minister of Law and Human
Menteri Kehakiman dan Hak Asasi Manusia Rights through Decision Letter No. AHU-
Republik Indonesia dengan Surat Keputusannya AH.01.09-0006747 dated April 20, 2022.
No. AHU-AH.01.09-0006747 tanggal 20 April
2022.
Entitas anak yang berada dibawah WKR sebagai The subsidiaries under WKR are as follows:
berikut:
- PT Waskita Fim Perkasa Realti (WFPR) - PT Waskita Fim Perkasa Realti (WFPR)
Pendirian WFPR (kepemilikan tidak The establishment of WFPR (indirect
langsung melalui WKR) adalah sesuai ownership through WKR) was based on
dengan akta notaris No. 122 tanggal 31 Mei notarial deed No. 122 dated May 31, 2018 of
2018 dari notaris Rosida Rajagukguk notary Rosida Rajagukguk Siregar.
Siregar. Akta pendirian ini telah mendapat The deed of establishment was approved by
persetujuan oleh Menteri Hukum dan Hak the Minister of Law and Human Rights
Asasi Manusia melalui surat keputusan through decision letter dated May 31, 2018
tanggal 31 Mei 2018 No. AHU- No. AHU-0075663.AH.01.11.Tahun 2018.
0075663.AH.01.11.Tahun 2018.
Anggaran dasar WFPR telah mengalami The WFPR’s Articles of Association have
beberapa kali perubahan, terakhir dengan been amended several times, most recently
akta No. 223 tanggal 22 September 2022 by Notarial Deed No. 223 dated September
dari Rosida Rajagukguk Siregar, S.H., 22, 2022 of Rosida Rajagukguk Siregar,
M.Kn., Notaris di Jakarta tentang pernyataan S.H., M.Kn., public Notary in Jakarta,
keputusan sirkuler Rapat Umum Pemegang regarding the circular decision statement of
Saham. Akta perubahan ini telah the General Meeting of Shareholders. This
memperoleh persetujuan dari Menteri amendment was acknowledged by
Kehakiman dan Hak Asasi Manusia the Ministry of Law and Human Rights of
- 26 -
Page 24
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Republik Indonesia dengan Surat the Republic of Indonesia in its Decision
Keputusannya No. AHU-AH.01.09-0058201 Letter No. AHU-AH.01.09-0058201 dated
tanggal 23 September 2022. September 23, 2022.
- PT Waskita Modern Realti (WMR) - PT Waskita Modern Realti (WMR)
Pendirian WMR (kepemilikan tidak langsung The establishment of WMR (indirect
melalui WKR) adalah sesuai dengan akta ownership through WKR) was based on
notaris No. 7 tanggal 17 Mei 2018 dari notarial deed No. 7 dated May 17, 2018 of
notaris Dewi Tenti Septi Artiany S.H., M.H., notary Dewi Tenti Septi Artiany S.H., M.H.,
M.Kn. Akta pendirian ini telah mendapat M.Kn. The deed of establishment was
persetujuan oleh Menteri Hukum dan Hak approved by the Minister of Law and Human
Asasi Manusia melalui surat Rights through the decision letter dated May
keputusan tanggal 17 Mei 2018 17, 2018 No. AHU-0069024.
No. AHU-0069024.AH.01.11.Tahun 2018. AH.01.11.Tahun 2018.
Anggaran dasar WMR telah mengalami The WMR’s Articles of Association have
beberapa kali perubahan, terakhir dengan been amended several times, most recently
akta No. 475 tanggal 31 Mei 2022 dari Tiara by Notarial Deed No. 475 dated May 31,
Vita, S.H., M.Kn., Notaris di Kota Bekasi 2022 of Tiara VIta, S.H., M.Kn., public Notary
tentang persetujuan anggota Direksi dan in Bekasi, regarding the approval of
Komisaris. Akta perubahan ini telah the members of the Board of Directors and
memperoleh persetujuan dari Menteri Commissioners. This amendment was
Kehakiman dan Hak Asasi Manusia acknowledged by the Ministry of Law and
Republik Indonesia dengan Surat Human Rights of the Republic of Indonesia
Keputusannya No. AHU-AH.01.09-0019573 in its Decision Letter No. AHU-AH.01.09-
tanggal 8 Juni 2022. 0019573 dated June 8, 2022.
PT Waskita Karya Infrastruktur (WKI) PT Waskita Karya Infrastruktur (WKI)
Pendirian WKI (entitas anak) adalah sesuai The establishment of WKI (subsidiary) was
dengan akta notaris No. 05 tanggal 4 Maret 2016 based on notarial deed No. 05 dated March 4,
dari notaris Fathiah Helmi S.H. Akta pendirian ini 2016 of notary Fathiah Helmi, S.H. The deed was
telah mendapat persetujuan oleh Menteri Hukum approved by the Minister of Law and Human
dan Hak Asasi Manusia melalui surat keputusan Rights through the decision letter
No. AHU-0019486. AH.01.01.Tahun 2016. No. AHU-0019486.AH.01.01.Tahun 2016.
Berdasarkan Akta Notaris No. 109 tanggal 26 Based on Notarial Deed No. 109 dated February
Februari 2019 dari Jose Dima Satria, S.H., 26, 2019 by Jose Dima Satria, S.H., M.Kn.,
M.Kn., Notaris di Jakarta Selatan, PT Waskita Notary in Jakarta Selatan, PT Waskita Karya
Karya Energi mengubah nama PT Waskita Karya Energi changes the Group’s name to
Energi menjadi PT Waskita Karya Infrastruktur. PT Waskita Karya Infrastruktur. This amendment
Akta perubahan ini memperoleh persetujuan dari deed was approved by the Minister of Law and
Menteri Hukum dan Hak Asasi Manusia Republik Human Rights of the Republic of Indonesia
Indonesia dalam Surat Keputusan No. AHU- through the Decision Letter No. AHU-
0010491.AH.01.02.Tahun 2019 tanggal 26 0010491.AH.01.02.Tahun 2019 dated February
Februari 2019. 26, 2019.
Anggaran Dasar WKI telah mengalami beberapa WKI's Articles of Association has been amended
kali perubahan, terakhir berdasarkan Akta several times, most recently based on Notarial
Notaris No. 05 tanggal 27 Juni 2023 dari Varinia, Deed No. 05 dated June 27, 2023 from
S.H, di Jakarta Pusat. Akta perubahan ini Varinia, S.H, in Central Jakarta. This amendment
memperoleh persetujuan dari Menteri Hukum deed obtained approval from
dan Hak Asasi Manusia Republik Indonesia the Minister of Law and Human Rights of
dalam Surat Keputusan No. AHU-0038187.AH. the Republic of Indonesia in Decree No. AHU-
01.02.Tahun 2023 tanggal 6 Juli 2023. 0038187.AH.01.02.Tahun 2023 July 6, 2023.
Entitas anak yang berada dibawah WKI sebagai The subsidiaries under WKI are as follows:
berikut:
- PT Waskita Sangir Energi (WSE) - PT Waskita Sangir Energi (WSE)
Pendirian WSE (kepemilikan tidak langsung The establishment of WSE (indirect
melalui WKI) adalah sesuai dengan akta ownership through WKI) was based on
notaris No. 22 tanggal 11 Juli 2013 dari notarial deed No. 22 dated July 11, 2013 of
notaris Fathiah Helmi, S.H. Akta pendirian ini notary Fathiah Helmi, S.H. The deed was
- 27 -
Page 25
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
telah mendapat persetujuan oleh Menteri approved by the Minister of Law and Human
Hukum dan Hak Asasi Manusia melalui surat Rights through the decision letter
keputusan No. AHU-40852.AH.01.01. Tahun No. AHU- 40852.AH.01.01.Tahun 2013.
2013.
Anggaran dasar WSE telah mengalami WSE's Articles of Association have been
beberapa kali perubahan, terakhir amended several times, most recently by
berdasarkan Akta Notaris No. 15 tanggal Notarial Deed No. 15 dated December 21,
21 Desember 2017 dari Kokoh Henry, S.H., 2017 by Kokoh Henry, S.H., M.Kn, notary in
M.Kn., notaris di Jakarta, dalam rangka Jakarta, regarding additional issuance of
penambahan modal Perusahaan. Akta capital of the Company. The above deed was
tersebut diatas telah diberitahukan kepada notified to the Minister of Law and Human
Menteri Hukum dan Hak Asasi Manusia dan Rights and was received pursuant to the
diterima berdasarkan Penerimaan Acceptance of Information No. AHU
Pemberitahuan No. AHU-AH.01.03-0204677 AH.01.03-0204677 and registered in Legal
dan dicatat di dalam Sistem Administrasi Entities Administration System of Minister of
Badan Hukum Kementerian Hukum dan Hak Law and Human Rights of the Republic of
Asasi Manusia Republik Indonesia Indonesia through the Company Registration
melalui Daftar Perseroan No. AHU0164421. No. AHU0164421.AH.01.11. Tahun 2017
AH.01.11.Tahun 2017 tanggal 22 Desember dated December 22, 2017.
2017.
- PT Waskita Wado Energi (WWE) - PT Waskita Wado Energi (WWE)
PT Waskita Wado Energi didirikan PT Waskita Wado Energi was established
berdasarkan akta No. 15 tanggal based on notarial deed No. 15 dated
19 Desember 2016 dari Kokoh Henry, S.H., December 19, 2016 by Kokoh Henry, S.H.,
M.Kn., notaris di Jakarta. Dengan M.Kn., notary in Jakarta. With ownership
kepemilikan saham sebesar 99,95% saham interest of 99.95% shares and the rest is
dan sisanya dimiliki oleh Koperasi Waskita. owned by Koperasi Waskita. The Deed of
Akta pendirian ini disahkan oleh Menteri Establishment was approved by the Minister
Hukum dan Hak Asasi Manusia Republik of Law and Human Rights of
Indonesia dengan Surat Keputusan the Republic of Indonesia through
No. AHU-0056418.AH.01.01 tanggal the Decision Letter No. AHU-0056418.AH.
21 Desember 2016 serta diumumkan dalam 01.01 dated December 21, 2016, and was
Berita Negara Republik Indonesia No. published in State Gazette of the Republic
2364/2017 tanggal 7 Februari 2017, Indonesia No. 2364/2017 dated February 7,
Tambahan No. 11. 2017, Supplement No. 11.
Anggaran Dasar WWE telah beberapa kali WWE’s Articles of Association has been
mengalami perubahan, terakhir berdasarkan amended for several times, most recently by
akta No. 142 tanggal 22 Juli 2019 oleh the notarial deed No. 142 on July 22, 2019 of
notaris Jose Dima Satria, S.H., M.Kn. yang notary Jose Dima Satria S.H., M.Kn., which
telah disetujui oleh Menteri Hukum dan Hak has been approved by the Minister of Law
Asasi Manusia dengan Surat Keputusan No. and Human Rights throught the Decision
AHU-AH.01.03-0306571 tanggal 31 Juli Letter No. AHU-AH.01.03-0306571 dated
2019, terkait perubahan ketentuan Pasal 3 July 31, 2019, changes in provisions of
yakni terkait maksud dan tujuan serta Article 3 related to the Company’s purpose
kegiatan usaha Perusahaan. and objectives and the business activities.
Perusahaan dan entitas anak selanjutnya The Company and its subsidiaries
secara bersama-sama disebut sebagai hereinafter will be referred as “the Group”.
“Grup”.
Dekonsolidasi Entitas Anak Deconsolidation of a Subsidiary:
PT Trans Jabar Tol (TJT) PT Trans Jabar Tol (TJT)
Pendirian TJT (kepemilikan tidak langsung The establishment of TJT (indirect ownership
melalui WTR) adalah sesuai dengan akta notaris through WTR) was based on notarial deed No.
No. 79 tanggal 19 Juli 2007 dari notaris Humberg 79 dated July 19, 2007 of notary Humberg Lie,
Lie, S.H., M.Kn. Akta pendirian ini telah S.H., M.Kn. This notarial deed has been
mendapat persetujuan oleh Menteri Hukum dan approved by the Minister of Law and Human
Hak Asasi Manusia melalui surat keputusan No. Rights through the decision letter No. W29-
W29-01398-HT.01.01- TH.2007. 01398-HT.01.01-TH.2007.
- 28 -
Page 26
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Akuisisi TJT oleh WTR sesuai dengan akta Acquisition of TJT by WTR was in accordance
notaris Jose Dima Satria, S.H., M.Kn No. 44 with the deed of notary Jose Dima Satria, S.H.,
tanggal 22 Desember 2015. Akta ini telah M.Kn No. 44 dated December 22, 2015. This
mendapat persetujuan oleh Menteri Hukum dan deed was approved by the Minister of Law and
Hak Asasi Manusia melalui surat Human Rights through the decision letter
No. AHU-AH.01.03-0990894. No. AHU-AH.01.03-0990894.
Anggaran Dasar TJT telah beberapa kali TJT's Articles of Association has been amended
mengalami perubahan, terakhir berdasarkan several times, most recently based on the circular
Keputusan sirkuler para pemegang saham decision of
sebagai pengganti dari Rapat Umum Pemegang the shareholders in lieu of the Extraordinary
Saham Luar Biasa PT TJT yang diaktakan General Meeting of Shareholders of PT TJT
melalui Akta Notaris No. 05 tanggal 16 Oktober which was notarized through Notarial Deed No.
2023 yang dibuat dihadapan Catur Virgo, SH., 05 dated October 16, 2023 which was made in
MH. Notaris di Jakarta. Bahwa WTR selaku the presence of Catur Virgo, SH., MH. Notary in
pemegang saham mayoritas menyetujui rencana Jakarta. That WTR as the majority shareholder
penggunaan dan peningkatan modal has approved the plan to use and increase
ditempatkan dan disetor sebesar issued and paid-up capital amounting to
Rp132.933.500.000 untuk modal kerja Rp132,933,500,000 for construction working
konstruksi, investasi pembangunan, dan retensi capital, development nvestment and retention of
ruas tol serta pemenuhan CDS. Akta ini telah toll roads as well as CDS fulfillment. This deed
mendapat persetujuan oleh Menteri Hukum dan has been approved by the Minister of Law and
Hak Asasi Manusia Republik Indonesia melalui Human Rights of the Republic of Indonesia
surat No. AHU-AH.01.03-0129749 tanggal through letter No. AHU-AH.01.03-0129749 dated
17 Oktober 2023. October 17, 2023.
Berdasarkan Akta Jual Beli Nomor 26 tanggal 25 Based on the Sale and Purchase Deed Number
Januari 2024 antara PT Waskita Toll Road 26 dated January 25, 2024, between PT Waskita
dengan PT Sarana Multi Infrastruktur telah terjadi Toll Road and PT Sarana Multi Infrastruktur,
transaksi jual beli kepemilikan saham WTR di there has been a sale and purchase transaction
TJT kepada SMI. WTR menjual dan of WTR share ownership in TJT to SMI. WTR
menyerahkan kepada SMI kepemilikan saham di sold and handed over to SMI its share ownership
TJT dengan harga total sebesar in TJT for a total price of Rp755,330,988,463,- or
Rp755.330.988.463,- atau sebesar 1.235.922 1,235,922 shares. Based on this transaction, SMI
lembar saham. Berdasarkan transaksi tersebut became a shareholder in TJT with a percentage
SMI menjadi salah satu pemegang saham di TJT of 25%, while WTR's ownership in TJT became
dengan prosentase sebesar 25%, sedangkan 74.99% and the remaining 0.01% was owned by
kepemilikan WTR di TJT menjadi 74,99% dan the Koperasi Waskita.
sisanya sebesar 0,01% dimiliki oleh Koperasi
Waskita.
Berdasarkan Berita Acara Pemenuhan dan/atau Based on the Minutes of Fulfillment and/or
Pengesampingan Persyaratan Pendahuluan Waiver of Preliminary Requirements which were
yang telah ditandatangani kedua belah pihak signed by both parties between WTR and SMI on
antara WTR dengan SMI tanggal 24 Januari January 24 2024, Part III: Preliminary
2024, Bagian III: Persyaratan Pendahuluan Para Requirements of the Parties Point 1.(ii) that after
Pihak Poin 1.(ii) bahwa setelah terjadinya the transaction between WTR and SMI occurs, in
transaksi antara WTR dan SMI maka dalam carrying out operations TJT is carried out under
menjalankan operasional TJT dilakukan dengan the provisions of Joint Control.
ketentuan Joint Control (Pengendalian
Bersama).
2. PENERAPAN PERNYATAAN STANDAR 2. ADOPTION
2 OF NEW AND REVISED
AKUNTANSI KEUANGAN BARU DAN REVISI STATEMENTS OF FINANCIAL ACCOUNTING
(PSAK) DAN INTERPRETASI STANDAR STANDARDS (PSAK) AND INTERPRETATIONS
AKUNTANSI KEUANGAN (ISAK) OF PSAK (ISAK)
Perubahan atas Pernyataan Standar Akuntansi Changes to the Statements of Financial
Keuangan (PSAK) Accounting Standards (PSAK)
Standar akuntansi revisian berikut, yang relevan The following revised accounting standards, which
untuk Grup, berlaku efektif sejak tanggal 1 Januari are relevant to the Group, are effective from
2023 dan tidak memiliki pengaruh material terhadap January 1, 2023 and do not result in material impact
laporan keuangan konsolidasian Grup: to the Group’s consolidated financial statements:
- 29 -
Page 27
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
• Amendemen PSAK 1: Penyajian Laporan • Amendment to PSAK 1: Presentation of Financial
Keuangan tentang pengungkapan kebijakan Statements regarding disclosure of accounting
akuntansi yang mengubah istilah “signifikan” policies that change the term "significant" to
menjadi “material” dan memberi penjelasan "material" and provide an explanation of material
mengenai kebijakan akuntansi material; accounting policies;
• Amendemen PSAK 1: Penyajian Laporan • Amendment to PSAK 1: Presentation of Financial
Keuangan tentang klasifikasi liabilitas; Statements regarding the classification of
liabilities;
• Amendemen PSAK 16: Aset Tetap tentang hasil • Amendment to PSAK 16: Fixed Assets regarding
sebelum penggunaan yang diintensikan; results before intended use;
• Amendemen PSAK 25: Kebijakan Akuntansi, • Amendment to PSAK 25: Accounting Policies,
Perubahan Estimasi Akuntansi, dan Kesalahan Changes in Accounting Estimates, and Errors
tentang definisi estimasi akuntansi dan regarding the definition of accounting estimates
penjelasannya; and explanations;
• Amendemen PSAK 46: Pajak Penghasilan • Amendment to PSAK 46: Income Taxes
tentang Pajak Tangguhan, terkait Aset dan regarding Deferred Tax, related to Assets and
Liabilitas yang timbul dari Transaksi Tunggal Liabilities arising from a Single Transaction
yang diadopsi dari Amendemen IAS 12 Income adopted from Amendment to IAS 12 Income
Taxes tentang Deferred Tax related to Assets Taxes concerning Deferred Tax related to Assets
and Liabilities arising from a Single Transaction. and Liabilities arising from a Single Transaction.
Standar akuntansi revisian berikut yang telah The following revised accounting standards issued
diterbitkan dan relevan untuk Grup berlaku efektif and relevant to the Group are effective from
sejak tanggal 1 Januari 2024 dan belum diterapkan January 1, 2024 and have not been early adopted by
secara dini oleh Grup: the Group:
• Amendemen PSAK 1 Penyajian Laporan • Amendment to PSAK 1, Presentation of Financial
Keuangan tentang kewajiban diklasifikasikan Statements about the classification of liabilities
sebagai lancar atau tidak lancar; as current or non-current;
• Amendemen PSAK 1 Penyajian Laporan • Amendment to PSAK 1, Presentation of Financial
Keuangan tentang liabilitas jangka Panjang Statements about about non-current liabilities
dengan kovenan; dan with covenants; and
• Amendemen PSAK 73: Sewa tentang liabilitas • Amendment to PSAK 73: Leases about lease
Sewa pada transaksi jual beli dan sewa-balik”. liability in a sales and leaseback”.
Efektif untuk periode yang dimulai pada atau setelah Effective for periods beginning on or after January 1,
tanggal 1 Januari 2025 2025
• PSAK 74 (amendemen) Kontrak Asuransi. • PSAK 74 (amendment) Insurance Contract.
Pada tanggal pengesahan laporan keuangan As at the authorisation date of these consolidated
konsolidasian, Grup sedang mempertimbangkan financial statements, the Group is assessing the
implikasi dari penerapan standar-standar tersebut, implication of the above standards, to the Group’s
terhadap laporan keuangan konsolidasian Grup. consolidated financial statements.
3. INFORMASI
2 KEBIJAKAN AKUNTANSI MATERIAL 3. MATERIAL ACCOUNTING POLICIES
INFORMATION
a. Pernyataan kepatuhan a. Statement of compliance
Laporan keuangan konsolidasian Grup disusun The consolidated financial statements of
sesuai dengan Standar Akuntansi Keuangan di the Group has been prepared in accordance with
Indonesia yang mencakup Pernyataan Standar Indonesian Financial Accounting Standards
Akuntansi Keuangan (PSAK) dan Interpretasi which include Statements of Financial
Standar Akuntansi Keuangan (ISAK) yang Accounting Standards (PSAK) and Interpretation
diterbitkan oleh Dewan Standar Akuntansi of Financial Accounting Standards (ISAK) issued
Keuangan - Ikatan Akuntan Indonesia (DSAK - by the Financial Accounting Standard Board -
IAI) dan Dewan Standar Akuntansi Syariah - Indonesian Institute of Accountant (DSAK - IAI)
Ikatan Akuntan Indonesia (DSAS - IAI), serta and Islamic Accounting Standard Board -
Peraturan Otoritas Jasa Keuangan (OJK) No. Indonesian Institute of Accountant (DSAS - IAI),
VIII.G.7 mengenai Penyajian dan Pengungkapan and Regulations of Financial Services Authority
Laporan Keuangan Emiten atau Perusahaan (OJK) No. VIII.G.7 regarding the Presentations
Publik. and Disclosures of the Financial Statements of
Listed Entities.
- 30 -
Page 28
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
b. Dasar penyusunan laporan keuangan b. Basis of preparation of the consolidated
konsolidasian financial statements
Dasar penyusunan laporan keuangan The consolidated financial statements has been
konsolidasian adalah biaya historis, kecuali prepared on the historical cost basis except for
properti dan instrumen keuangan tertentu yang certain properties and financial instruments that
diukur pada jumlah revaluasian atau nilai wajar are measured at revalued amounts or fair values
pada setiap akhir periode pelaporan, yang at the end of each reporting period, as explained
dijelaskan dalam kebijakan akuntansi di bawah in the accounting policies below.
ini.
Biaya historis umumnya didasarkan pada nilai Historical cost is generally based on the fair value
wajar dari imbalan yang diberikan dalam of the consideration given in exchange for goods
pertukaran barang dan jasa. and services.
Nilai wajar adalah harga yang akan diterima Fair value is the price that would be received to
untuk menjual suatu aset atau harga yang akan sell an asset or paid to transfer a liability in an
dibayar untuk mengalihkan suatu liabilitas dalam orderly transaction between market participants
suatu transaksi teratur antara pelaku pasar pada at the measurement date, regardless of whether
tanggal pengukuran, terlepas dari apakah harga that price is directly observable or estimated
tersebut dapat diamati secara langsung atau using another valuation technique. In estimating
diestimasi menggunakan teknik penilaian lain. the fair value of an asset or a liability, the Group
Dalam mengestimasi nilai wajar dari suatu aset takes into account the characteristics of
atau liabilitas, Grup memperhitungkan the asset or liability if market participants would
karakteristik aset atau liabilitas jika pelaku pasar take those characteristics into account when
akan memperhitungkan karakteristik tersebut pricing the asset or liability at the measurement
ketika menentukan harga aset atau liabilitas date. Fair value for measurement and/ or
pada tanggal pengukuran. Nilai wajar untuk disclosure purposes in these consolidated
tujuan pengukuran dan/ atau pengungkapan financial statements is determined on such a
pada laporan keuangan konsolidasian ditentukan basis, except for share-based payment
atas dasar tersebut, kecuali untuk transaksi transactions that are within the scope of PSAK 53
pembayaran berbasis saham yang merupakan Share-based Payment, leasing transactions that
ruang lingkup PSAK 53 Pembayaran Berbasis are within the scope of PSAK 73, and
Saham, transaksi sewa yang merupakan ruang measurements that have some similarities to fair
lingkup PSAK 73, dan pengukuran yang memiliki value but are not fair value, such as net realizable
kemiripan dengan nilai wajar namun bukan value in PSAK 14 Inventories or value in use in
merupakan nilai wajar, seperti nilai realisasi PSAK 48.
bersih dalam PSAK 14 Persediaan atau nilai
pakai dalam PSAK 48.
Laporan arus kas konsolidasian disusun dengan The consolidated statements of cash flows are
menggunakan metode langsung dengan prepared using the direct method with
mengelompokkan arus kas dalam aktivitas classifications of cash flows into operating,
operasi, investasi dan pendanaan. investing and financing activities.
Direksi memiliki, pada saat persetujuan laporan The directors have, at the time of approving
keuangan, suatu ekspektasi yang memadai the financial statements, a reasonable
bahwa Grup memiliki sumber daya yang cukup expectation that the Group has adequate
untuk melanjutkan keberadaan operasinya untuk resources to continue in operational existence for
di masa yang akan datang. Sehingga, mereka the foreseeable suture. Thus, they continue to
melanjutkan penerapan dasar akuntansi adopt the going concern basis of accounting in
kelangsungan usaha dalam penyusunan laporan preparing the consolidated financial statements.
keuangan konsolidasian.
c. Dasar Konsolidasian c. Basis of Consolidation
Laporan keuangan konsolidasian The consolidated financial statements
menggabungkan laporan keuangan Perusahaan incorporate the financial statements of
dan entitas (termasuk entitas terstruktur) yang the Company and entities (including structured
dikendalikan oleh Perusahaan dan entitas anak. entities) controlled by the Company and its
Pengendalian tercapai jika Perusahaan memiliki subsidiaries. Control is achieved where
kekuasaan atas investee, eksposur atau hak the Company has the power over the investee, is
atas imbal hasil variabel dari keterlibatannya exposed, or has rights, to variable returns from
dengan investee, dan kemampuan untuk its involvement with the investee, and has
- 31 -
Page 29
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
menggunakan kekuasaannya atas investee the ability to use its power to affect its returns.
untuk mempengaruhi jumlah imbal hasil investor. The consolidated financial statements
Laporan keuangan konsolidasian mencakup incorporate the financial statements of
laporan keuangan Perusahaan dan entitas- the Company and its subsidiaries.
entitas anak.
Perusahaan menilai kembali apakah entitas The Company reassesses whether the entity is in
tersebut adalah investee jika fakta dan keadaan fact an investee when facts and circumstances
yang mengindikasikan adanya perubahan indicate that there has been changes to one or
terhadap satu atau lebih dari tiga elemen more of the three control elements mentioned
pengendalian yang disebutkan di atas. above.
Ketika Perusahaan memiliki hak suara kurang When the Company has less than a majority of
dari mayoritas di investee, ia memiliki kekuasaan the voting rights of an investee, it has power over
atas investee ketika hak suara cukup untuk the investee, when the voting rights are
memberinya kemampuan praktis untuk sufficient to give it the practical ability to direct
mengarahkan aktivitas relevan secara sepihak. the relevant activities of the investee unilaterally.
Perusahaan mempertimbangkan seluruh fakta The Company considers all relevant facts and
dan keadaan yang relevan dalam menilai apakah circumstances in assessing whether or not
hak suara Perusahaan cukup untuk memberikan the Company’s voting rights in an investee are
Perusahaan kekuasaan, termasuk (i) ukuran sufficient to give it power, including (i) the size of
kepemilikan hak suara Perusahaan relatif the Company’s holding of voting rights relative to
terhadap ukuran dan penyebaran kepemilikan the size and dispersion of holding of the other
pemilik hak suara lain; (ii) hak suara potensial vote holders; (ii) potential voting rights held by
yang dimiliki oleh Perusahaan, pemegang suara the Company, other vote holders or other parties;
lain atau pihak lain; (iii) hak yang timbul dari (iii) rights arising from other contractual
pengaturan kontraktual lain; dan (iv) setiap fakta arrangements; and (iv) any additional facts and
dan keadaan tambahan apapun circumstances that indicate that the Company
mengindikasikan bahwa Perusahaan memiliki, has, or does not have, the current ability to direct
atau tidak memiliki, kemampuan kini untuk the relevant activities at the time that decisions
mengarahkan aktivitas yang relevan pada saat need to be made, including voting patterns at
keputusan perlu dibuat, termasuk pola suara previous shareholders’ meetings.
pemilikan dalam RUPS sebelumnya.
Konsolidasi entitas anak dimulai ketika Consolidation of a subsidiary begins when
Perusahaan memperoleh pengendalian atas the Company obtains control over the subsidiary
entitas anak dan akan dihentikan ketika and ceases when the Company loses control of
Perusahaan kehilangan pengendalian pada the subsidiary. Specifically, income and expense
entitas anak. Secara khusus, pendapatan dan of a subsidiary acquired or disposed of during
beban entitas anak yang diakuisisi atau dijual the year are included in the consolidated
selama tahun berjalan termasuk dalam laporan statement of profit or loss and other
laba rugi dan penghasilan komprehensif lain comprehensive income from the date
konsolidasian dari tanggal diperolehnya the Company gains control until the date when
pengendalian Perusahaan sampai tanggal ketika the Company ceases to control the subsidiary.
Perusahaan berhenti mengendalikan entitas
anak.
Jika diperlukan, penyesuaian dapat dilakukan When necessary, adjustment are made to
terhadap laporan keuangan entitas anak agar the financial statements of subsidiary to bring
kebijakan akuntansi sesuai dengan kebijakan their accounting policies in line with the Group’s
akuntansi Grup. accounting policies.
Seluruh aset dan liabilitas dalam intra Grup, All assets and liabilities in intra Group, equity,
ekuitas, pendapatan, biaya dan arus kas yang income, expenses and cash flows relating to
berkaitan dengan transaksi dalam Grup transactions in the Group are eliminated in full on
dieliminasi secara penuh pada saat konsolidasi. consolidation.
Kepentingan non pengendali di entitas anak Non-controlling interests in subsidiaries are
diidentifikasi secara terpisah dari ekuitas Grup identified separately from the Group’s equity
yang ada. Kepentingan pemegang saham non therein. Those interests of non-controlling
pengendali yang merupakan kepentingan stockholders that are present ownership interests
kepemilikan yang memberikan pemiliknya hak entitling their holders to a proportionate share of
terhadap bagian proporsional aset bersih pada net assets upon liquidation may initially be
saat likuidasi pada awalnya dapat diukur sebesar measured at fair value or at the non-controlling
- 32 -
Page 30
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
nilai wajar atau bagian proporsional kepentingan interests’ proportionate share of
non pengendali atas nilai wajar aset bersih the fair value of the acquiree’s identifiable net
teridentifikasi pihak yang diakuisisi. Pilihan assets. The choice of measurement is made on
pengukuran dibuat untuk masing-masing an acquisition-by-acquisition basis. Other non-
akuisisi. Kepentingan non pengendali lain controlling interests are initially measured at fair
awalnya diukur sebesar nilai wajar. Setelah value. Subsequent to acquisition, the carrying
akuisisi, jumlah tercatat kepentingan non- amount of non-controlling interests is
pengendali adalah jumlah kepentingan tersebut the amount of those interests at initial recognition
pada pengakuan awal ditambah bagian plus the non-controlling interests’ share of
kepentingan non pengendali dari perubahan subsequent changes in equity.
selanjutnya di ekuitas.
Laba atau rugi dan setiap komponen Profit or loss and each component of other
penghasilan komprehensif lain diatribusikan comprehensive income are attributed to
kepada pemilik entitas induk dan kepada the owners of the Company and to the non-
kepentingan non pengendali. Jumlah controlling interest. Total comprehensive income
penghasilan komprehensif entitas anak of subsidiary is attributed to the owners of
diatribusikan kepada pemilik entitas induk dan the Company and the non-controlling interest
kepentingan non pengendali meskipun hal even if this results in the non-controlling interest
tersebut mengakibatkan kepentingan non having a deficit balance.
pengendali memiliki saldo defisit.
Perubahan kepemilikan Grup pada entitas anak Changes in the Group’s ownership interest in
yang tidak mengakibatkan kehilangan existing subsidiary that do not result in
pengendalian Grup atas entitas anak dicatat the Group losing control over the subsidiary are
sebagai transaksi ekuitas. Jumlah tercatat dari accounted for as equity transactions.
kepemilikan Grup dan kepentingan non- The carrying amounts of the Group’s interest and
pengendali disesuaikan untuk mencerminkan the non-controlling interest are adjusted to reflect
perubahan kepentingan relatifnya dalam entitas the changes in their relative interest in the
anak. Selisih antara jumlah tercatat kepentingan subsidiary. Any difference between
non pengendali yang disesuaikan dan nilai wajar the amount by which the non-controlling interest
imbalan yang dibayar atau diterima diakui secara are adjusted and the fair value of
langsung dalam ekuitas dan diatribusikan the consideration paid or received is recognized
dengan pemilik entitas induk. directly in equity and attributed to owners of
the Company.
Ketika Grup kehilangan pengendalian pada When the Group losses control of a subsidiary, a
entitas anak, keuntungan atau kerugian diakui gain or loss is recognized in profit or loss and is
dalam laba rugi dan dihitung sebagai perbedaan calculated as the difference between (i)
antara (i) agregat nilai wajar pembayaran yang the aggregate of the fair value of
diterima dan nilai wajar sisa kepemilikan the consideration received and the fair value of
(retained interest) dan (ii) jumlah tercatat any retained interest and (ii) the previous carrying
sebelumnya dari aset (termasuk goodwill), dan amount of the assets (including goodwill), and
liabilitas dari entitas anak dan setiap kepentingan liabilities of the subsidiary and any non-
non pengendali. Seluruh jumlah yang diakui controlling interest. All amounts previously
sebelumnya dalam penghasilan komprehensif recognized in other comprehensive income in
lain yang terkait dengan entitas anak yang dicatat relation to that subsidiary are accounted for as if
seolah-olah Grup telah melepaskan secara the Group had directly disposed of the related
langsung aset atau liabilitas terkait entitas anak assets or liabilities of
(yaitu direklasifikasi ke laba rugi atau ditransfer the subsidiary (i.e. reclassified to profit or loss or
ke kategori lain dari ekuitas sebagaimana transferred to another category of equity as
ditentukan/diizinkan oleh standar akuntansi yang specified/permitted by applicable accounting
berlaku). Nilai wajar setiap sisa investasi pada standards). The fair value of any investment
entitas anak terdahulu pada tanggal hilangnya retained in the former subsidiary at the date when
pengendalian dianggap sebagai nilai wajar pada control is lost is regarded as the fair value on
saat pengakuan awal untuk akuntansi berikutnya initial recognition for subsequent accounting
dalam PSAK 71, Instrumen Keuangan: under PSAK 71, Financial Instruments:
Pengakuan dan Pengukuran atau, ketika Recognition and Measurement or, when
berlaku, biaya perolehan pada saat pengakuan applicable, the cost on initial recognition of an
awal dari investasi pada entitas asosiasi atau investment in an associate or a joint venture.
ventura bersama.
- 33 -
Page 31
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
d. Kombinasi bisnis d. Business combinations
Akuisisi bisnis dicatat dengan menggunakan Acquisitions of businesses are accounted for
metode akuisisi. Imbalan yang dialihkan dalam using the acquisition method. The consideration
suatu kombinasi bisnis diukur pada nilai wajar, transferred in a business combination is
yang dihitung sebagai hasil penjumlahan dari measured at fair value, which is calculated as the
nilai wajar tanggal akuisisi atas seluruh aset yang sum of the acquisition-date fair values of
dialihkan oleh Grup, liabilitas yang diakui oleh the assets transferred by the Group, liabilities
Grup kepada pemilik sebelumnya dari pihak incurred by the Group to the former owners of the
yang diakuisisi dan kepentingan ekuitas yang acquiree, and the equity interests issued by the
diterbitkan oleh Grup dalam pertukaran Group in exchange for control of
pengendalian dari pihak yang diakuisisi. Biaya- the acquiree. Acquisition-related costs are
biaya terkait akuisisi diakui di dalam laba rugi recognized in profit or loss as incurred.
pada saat terjadinya.
Pada tanggal akuisisi, aset teridentifikasi yang At the acquisition date, the identifiable assets
diperoleh dan liabilitas yang diambil alih diakui acquired and the liabilities assumed are
pada nilai wajar, kecuali untuk: recognized at their fair value, except that:
• Aset atau liabilitas pajak tangguhan yang • Deferred tax assets or liabilities and assets
berkaitan dengan pengaturan imbalan kerja or liabilities related to employee benefit
diakui dan diukur masing-masing arrangements are recognized and measured
berdasarkan PSAK 46 Pajak Penghasilan in accordance with PSAK 46 Income Taxes
dan PSAK 24 Imbalan Kerja; and PSAK 24 Employee Benefits,
respectively;
• Instrumen liabilitas atau ekuitas yang • Liabilities or equity instruments related to
berkaitan dengan perjanjian pembayaran share-based payment arrangements of the
berbasis saham dari pihak yang diakuisisi acquiree or share-based payment
atau pengaturan pembayaran berbasis arrangements of the Group entered into to
saham Grup yang dibuat untuk replace share-based payment arrangements
menggantikan pengaturan pembayaran of the acquirer are measured in accordance
berbasis saham dari pihak yang with PSAK 53 Share-based Payments at the
mengakuisisi diukur berdasarkan PSAK 53 acquisition date; and
Pembayaran Berbasis Saham pada tanggal
akuisisi; dan
• Aset (atau kelompok lepasan) yang • Assets (or disposal groups) that are
diklasifikasikan sebagai yang dimiliki untuk classified as held for sale in accordance with
dijual berdasarkan PSAK 58 Aset tidak PSAK 58 Non-current Assets Held for Sale
Lancar yang Dikuasai untuk Dijual dan and Discontinued Operations and are
Operasi yang Dihentikan diukur sesuai measured in accordance with that standard.
dengan standar tersebut.
Goodwill diukur sebagai selisih lebih dari nilai Goodwill is measured as the excess of the sum
gabungan dari imbalan yang dialihkan, jumlah of the consideration transferred, the amount of
setiap kepentingan non pengendali pada pihak any non-controlling interests in the acquiree, and
diakuisisi dan nilai wajar pada tanggal akuisisi the fair value of the acquirer’s previously held
kepentingan ekuitas yang sebelumnya dimiliki equity interest in the acquiree (if any) over the net
oleh pihak pengakuisisi pada pihak diakuisisi of the acquisition-date amounts of
(jika ada) atas jumlah neto dari aset teridentifikasi the identifiable assets acquired and the liabilities
yang diperoleh dan liabilitas yang diambil alih assumed. If, after the reassessment, the net of
pada tanggal akuisisi. Jika, setelah penilaian the acquisition-date amounts of the identifiable
kembali, jumlah neto dari aset teridentifikasi yang assets acquired and liabilities assumed exceeds
diperoleh dan liabilitas yang diambil alih pada the sum of the consideration transferred,
tanggal akuisisi melebihi jumlah imbalan yang the amount of any non-controlling interests in the
dialihkan, jumlah dari setiap kepentingan non acquiree and the fair value of the acquirer’s
pengendali pada pihak diakuisisi dan nilai wajar previously held interest in the acquiree (if any),
pada tanggal akuisisi kepentingan ekuitas yang the excess is recognized immediately in profit or
sebelumnya dimiliki oleh pihak pengakuisisi pada loss as a gain from bargain purchase.
pihak diakuisisi (jika ada), selisih lebih tersebut
diakui segera dalam laba rugi sebagai
keuntungan pembelian dengan diskon.
Bila imbalan yang dialihkan oleh Grup dalam When the consideration transferred by
suatu kombinasi bisnis termasuk aset atau the Group in a business combination includes
- 34 -
Page 32
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
liabilitas yang berasal dari pengaturan imbalan assets or liabilities resulting from a contingent
kontinjen (contingent consideration consideration arrangement, the contingent
arrangement), imbalan kontinjen tersebut diukur consideration is measured at its acquisition-date
pada nilai wajar pada tanggal akuisisi dan fair value and included as part of
termasuk sebagai bagian dari imbalan yang the consideration transferred in a business
dialihkan dalam suatu kombinasi bisnis. combination.
Perubahan dalam nilai wajar atas imbalan Changes in the fair value of the contingent
kontinjen yang memenuhi syarat sebagai consideration that qualify as measurement
penyesuaian periode pengukuran disesuaikan period adjustments are adjusted retrospectively,
secara retrospektif, dengan penyesuaian terkait with corresponding adjustments against goodwill.
terhadap goodwill. Penyesuaian periode Measurement period adjustments are
pengukuran adalah penyesuaian yang berasal adjustments that arise from additional
dari informasi tambahan yang diperoleh selama information obtained during the measurement
periode pengukuran (yang tidak melebihi satu period (which cannot exceed one year from the
tahun sejak tanggal akuisisi) tentang fakta-fakta acquisition date) about facts and circumstances
dan kondisi yang ada pada tanggal akuisisi. that existed at the acquisition date.
Perlakuan akuntansi selanjutnya untuk The subsequent accounting for changes in
perubahan nilai wajar dari imbalan kontinjensi the fair value of the contingent consideration that
yang tidak memenuhi syarat sebagai do not qualify as measurement period
penyesuaian periode pengukuran tergantung adjustments depends on how the contingent
pada bagaimana imbalan kontinjensi consideration is classified. Contingent
diklasifikasikan. Imbalan kontinjensi yang consideration that is classified as equity is not
diklasifikasikan sebagai ekuitas tidak diukur remeasured at subsequent reporting dates and
kembali pada setiap tanggal pelaporan dan its subsequent settlement is accounted for within
penyelesaian selanjutnya diperhitungkan dalam equity. Other contingent consideration is
ekuitas. Imbalan kontinjensi lain diukur ulang ke remeasured to fair value at subsequent reporting
nilai wajar pada tanggal pelaporan selanjutnya dates with changes in fair value recognized in
dengan perubahan nilai wajar diakui di laba rugi. profit or loss.
Bila suatu kombinasi bisnis dilakukan secara When a business combination is achieved in
bertahap, kepemilikan terdahulu Grup (termasuk stages, the Group’s previously held equity
operasi bersama) atas pihak terakuisisi diukur interest (including joint operations) in
kembali ke nilai wajar pada tanggal akuisisi dan the acquiree is remeasured to fair value at
keuntungan atau kerugian dihasilkan, jika ada, the acquisition date and the resulting gain or loss,
diakui dalam laba rugi. Jumlah yang berasal dari if any, is recognized in profit or loss. Amounts
kepemilikan sebelum tanggal akuisisi yang arising from interests in the acquiree prior to the
sebelumnya telah diakui dalam penghasilan acquisition date that have previously been
komprehensif lain direklasifikasi ke laba rugi recognized in other comprehensive income are
dimana perlakuan tersebut akan sesuai jika reclassified to profit or loss where such treatment
kepemilikan tersebut dilepas/ dijual. would be appropriate if that interests were
disposed/ sold of.
Jika akuntansi awal untuk kombinasi bisnis If the initial accounting for a business
belum selesai pada akhir periode pelaporan saat combination is incomplete by the end of the
kombinasi terjadi, Grup melaporkan jumlah reporting period in which the combination occurs,
sementara untuk pos-pos yang proses the Group reports provisional amounts for the
akuntansinya belum selesai dalam laporan items for which the accounting is incomplete.
keuangannya. Selama periode pengukuran, Those provisional amounts are adjusted during
pihak pengakuisisi menyesuaikan, aset atau the measurement period, or additional assets or
liabilitas tambahan yang diakui, untuk liabilities are recognized, to reflect new
mencerminkan informasi baru yang diperoleh information obtained about facts and
tentang fakta dan keadaan yang ada pada circumstances that existed as of the acquisition
tanggal akuisisi dan, jika diketahui, akan date that, if known, would have affected
berdampak pada jumlah yang diakui pada the amount recognized as of that date.
tanggal tersebut.
e. Kombinasi bisnis entitas sepengendali e. Business combination under common
control
Kombinasi bisnis entitas sepengendali dicatat Business combination of entities under common
dengan menggunakan metode penyatuan control that qualifies as a business are accounted
kepemilikan dimana aset dan liabilitas yang for using pooling of interest method where assets
- 35 -
Page 33
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
diperoleh dari kombinasi bisnis dicatat oleh and liabilities acquired in the business
pengakuisisi pada jumlah tercatatnya. combination are recorded by the acquirer at their
book values.
Selisih antara jumlah imbalan yang dialihkan dan The difference between the transfer price and the
jumlah tercatat disajikan sebagai tambahan book value is presented as additional paid in
modal disetor dan tidak direklasifikasi ke laba capital and is not reclassified to profit or loss
rugi ketika hilang sepengendalian. when control is lost.
Metode penyatuan kepemilikan diterapkan The pooling of interest method is applied as if the
seolah-olah entitas telah bergabung sejak entities had been combined from the period when
periode dimana entitas yang bergabung berada the merging entities were placed under common
dalam sepengendalian. control.
f. Transaksi dan Penjabaran Laporan Keuangan f. Foreign Currency Transactions and
dalam Mata Uang Asing Translation of Financial Statements
Dalam menyiapkan laporan keuangan In preparing consolidated financial statements,
konsolidasian, Grup mencatat dengan the Group record by using the currency of
menggunakan mata uang dari lingkungan the primary economic environment where
ekonomi utama di mana entitas beroperasi the entity operates (“the functional currency”).
(“mata uang fungsional”). Mata uang fungsional The functional currency of the Group is Rupiah
Grup adalah Rupiah (Rp). (Rp).
Mata uang fungsional kantor cabang di Dubai, The functional currency of branch offices in
Malaysia dan Timor Leste, adalah Arab Emirates Dubai, Malaysia and Timor Leste are United Arab
Dirham (AED), Saudi Arabian Riyal (SAR), Emirates Dirham (AED), Saudi Arabian Riyal
Ringgit (MYR) dan Dolar Amerika Serikat (USD). (SAR), Ringgit (MYR) and United States Dollar
Untuk tujuan penyajian laporan keuangan (USD), respectively. For presentation purposes
konsolidasian, aset dan liabilitas Kantor cabang of consolidated financial statements, assets and
di Dubai dan Timor Leste, pada tanggal laporan liabilities of branches in Dubai and Timor Leste at
dijabarkan ke Rupiah (Rp) menggunakan kurs reporting date are translated to Rupiah (Rp) at
penutup yang berlaku pada tanggal laporan the closing rate at statement of financial position
posisi keuangan, sedangkan pendapatan dan date, while revenues and expenses are
beban dijabarkan dengan menggunakan kurs translated using average rate for the period. For
rata-rata. Untuk tujuan penggabungan, laporan combining purposes, the financial statements of
keuangan kantor cabang luar negeri dijabarkan the branch office are translated into Rupiah (Rp)
dalam Rupiah (Rp) dengan kurs Reuters, based on Reuters Rate, while Malaysia and
sedangkan kantor cabang Malaysia dan Timor Timor Leste Branch maintained in Ringgit and
Leste menggunakan mata uang Ringgit dan United Stated Dollar (USD) using Bank Indonesia
Dolar Amerika Serikat (USD) dengan kurs Bank (BI) rate. All resulting exchange differences shall
Indonesia (BI). Selisih kurs yang dihasilkan be recognized in other comprehensive income.
diakui dalam penghasilan komprehensif lain.
Dalam penyusunan laporan keuangan setiap In preparing the financial statements of each
entitas individual grup, transaksi dalam mata individual group entity, transactions in currencies
uang asing selain mata uang fungsional entitas other than the entity’s functional currency
(mata uang asing) diakui pada kurs yang berlaku (foreign currencies) are recognized at the rates
pada tanggal transaksi. Pada akhir periode of exchange prevailing at the dates of
pelaporan, pos moneter dalam mata uang asing the transactions. At the end of reporting period,
dijabarkan ke dalam Rupiah (Rp) menggunakan foreign currency monetary items are translated to
kurs penutup, yaitu kurs tengah BI pada tanggal Rupiah (Rp) using the closing rate, i.e middle rate
31 Maret 2024 dan 31 Desember 2023 sebagai of BI as of March 31, 2024 and December 31,
berikut: 2023 as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Dolar Amerika Serikat (USD) 15.853 15.731 U.S Dollar (USD)
Dolar Singapura (SGD) 11.766 11.659 Singapore Dollar (SGD)
Euro Eropa (EUR) 17.161 16.713 European Euro (EUR)
Ringgit Malaysia (MYR) 3.351 3.556 Malaysian Ringgit (MYR)
Riyal Arab Saudi (SAR) 4.227 4.184 Saudi Arabian Riyal (SAR)
Yen Jepang (JPY) 105 118 Japanese Yen (JPY)
- 36 -
Page 34
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pos-pos non-moneter yang diukur pada nilai Non-monetary items carried at fair value that are
wajar dalam valuta asing dijabarkan kembali denominated in foreign currencies are
pada kurs yang berlaku pada tanggal ketika nilai retranslated at the rates prevailing at the date
wajar ditentukan. Pos nonmoneter yang diukur when the fair value was determined. Non-
dalam biaya historis dalam valuta asing tidak monetary items that are measured in terms of
dijabarkan kembali. historical cost in a foreign currency are not
retranslated.
Selisih kurs atas pos moneter diakui dalam laba Exchange differences on monetary items are
rugi pada periode saat terjadinya kecuali untuk: recognized in profit or loss in the period in which
they arise except for:
- Selisih kurs atas pinjaman valuta asing yang - Exchange differences on foreign currency
berkaitan dengan aset dalam konstruksi borrowings relating to assets under
untuk penggunaan yang produktif di masa construction for future productive use, which
depan, termasuk dalam biaya perolehan are included in the cost of those assets when
aset tersebut ketika dianggap sebagai they are regarded as an adjustment to
penyesuaian atas biaya bunga atas interest costs on those foreign currency
pinjaman valuta asing. borrowing.
- Selisih kurs atas transaksi yang ditetapkan - Exchange differences on transaction entered
untuk tujuan lindung nilai risiko valuta asing into in order to hedge certain foreign
tertentu. currency risks.
- Selisih kurs atas pos moneter piutang atau - Exchange differences on monetary items
utang dari kegiatan usaha luar negeri yang receivable from or payable to a foreign
penyelesaiannya tidak direncanakan atau operation for which settlement is neither
tidak mungkin terjadi (membentuk bagian planned nor likely to occur (therefore forming
dari investasi bersih dalam kegiatan usaha part of the net investment in the foreign
luar negeri), yang pada awalnya diakui pada operation), which are recognized initially in
penghasilan komprehensif lain dan other comprehensive income and
direklasifikasi dari ekuitas ke laba rugi pada reclassified from equity to profit or loss on
pembayaran kembali pos moneter. repayment of the monetary items.
g. Transaksi dan Saldo dengan Pihak Berelasi g. Related Party Transactions and Balances
Pihak berelasi adalah orang atau entitas yang A related party is a person or an entity that is
terkait dengan entitas pelapor: related to the Group:
a) Orang atau anggota keluarga dekatnya a) A person or a close member of that person’s
mempunyai relasi dengan entitas pelapor family is related to a reporting entity if that
jika orang tersebut: person:
i. Memiliki pengendalian atau i. Has control or joint control over
pengendalian bersama atas entitas the reporting entity;
pelapor;
ii. Memiliki pengaruh signifikan atas entitas ii. Has significant influence over
pelapor; atau the reporting entity; or
iii. Merupakan personil manajemen kunci iii. Is a member of the key management
entitas pelapor atau entitas induk dari personnel of the reporting entity or of a
entitas pelapor. parent of the reporting entity.
b) Suatu entitas berelasi dengan entitas b) An entity is related to the reporting entity if
pelapor jika memenuhi salah satu hal any of the following conditions applies:
berikut:
i. Entitas dan entitas pelapor adalah i. The entity and the reporting entity are
anggota dari kelompok usaha yang members of the same group (which
sama (artinya entitas induk, entitas means that each parent, subsidiary and
anak, dan entitas anak berikutnya saling fellow subsidiary is related to
berelasi dengan entitas lain); the others);
ii. Satu entitas adalah entitas asosiasi atau ii. One entity is an associate or joint
ventura bersama dari entitas lain (atau venture of the other entity (or an
entitas asosiasi atau ventura bersama associate or joint venture of a member
yang merupakan anggota suatu of a group of which the other entity is a
kelompok usaha, yang mana entitas lain member);
tersebut adalah anggotanya);
- 37 -
Page 35
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
iii. Kedua entitas tersebut adalah ventura iii. Both entities are joint ventures of
bersama dari pihak ketiga yang sama; the same third party;
iv. Satu entitas adalah ventura bersama iv. One entity is a joint venture of a third
dari entitas ketiga dan entitas yang lain entity and the other entity is an associate
adalah entitas asosiasi dari entitas of the third entity;
ketiga;
v. Entitas tersebut adalah suatu program v. The entity is a post-employment benefit
imbalan pasca kerja untuk imbalan kerja plan for the benefit of employees of
dari salah satu entitas pelapor atau either the reporting entity, or an entity
entitas yang terkait dengan entitas related to the reporting entity.
pelapor. Jika entitas pelapor adalah If the reporting entity is the entity
entitas yang menyelenggarakan that organized the plan, the sponsoring
program tersebut, maka entitas sponsor employers are also related to
juga berelasi dengan entitas pelapor; the reporting entity;
vi. Entitas yang dikendalikan atau vi. The entity is controlled or jointly
dikendalikan bersama oleh orang yang controlled by a person identified in (a);
diidentifikasi dalam huruf (a);
vii. Orang yang diidentifikasi dalam huruf (a) vii. A person identified in (a) (i) has
(i) memiliki pengaruh signifikan atas significant influence over the entity or is
entitas atau merupakan personil a member of the key management
manajemen kunci entitas (atau entitas personnel of the entity (or a parent of
induk dari entitas); atau the entity); or
viii. Entitas, atau anggota dari kelompok viii. The entity, or any member of a group of
yang mana entitas merupakan bagian which it is a part, provides key
dari kelompok tersebut, menyediakan management personnel services to
jasa personil manajemen kunci kepada the reporting entity or to the parent of
entitas pelapor atau kepada entitas the reporting entity.
induk dari entitas pelapor.
Entitas yang berelasi dengan Pemerintah adalah A Government-related entity is an entity that is
entitas yang dikendalikan, dikendalikan controlled, jointly controlled or significantly
bersama, atau dipengaruhi oleh Pemerintah. influenced by the government. Government
Pemerintah mengacu kepada pemerintah, refers to Government, Government agencies and
instansi Pemerintah dan badan yang serupa baik similar bodies whether local, national or
lokal, nasional maupun internasional. international.
Entitas yang berelasi dengan Pemerintah dapat Government-related entity can be an entity that is
berupa entitas yang dikendalikan oleh controlled by the Government of Republic of
Pemerintah Republik Indonesia melalui Indonesia, represented by the BUMN’s Ministry
Kementerian BUMN sebagai kuasa pemegang as a shareholder’s representative.
saham.
Transaksi signifikan yang dilakukan dengan Significant transactions with related parties,
pihak-pihak berelasi, baik dilakukan dengan whether or not made at similar terms and
kondisi dan persyaratan yang sama dengan conditions as those done with third parties, are
pihak ketiga maupun tidak, diungkapkan pada disclosed in the consolidated financial
laporan keuangan konsolidasian. statements.
h. Instrumen keuangan h. Financial instruments
Instrumen keuangan adalah setiap kontrak yang A financial instrument is any contract that gives
memberikan kenaikan nilai aset keuangan dari rise to a financial asset of one entity and a
satu entitas dan liabilitas keuangan atau financial liability or equity instrument of another
instrumen ekuitas dari entitas lainnya. entity.
1. Aset keuangan 1. Financial
2 assets
Pengakuan awal Initial recognition
Klasifikasi dan pengukuran aset keuangan Classification and measurement of financial
harus didasarkan pada bisnis model dan assets are based on business model and
- 38 -
Page 36
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
arus kas kontraktual - apakah semata dari contractual cash flows - whether from solely
pembayaran pokok dan bunga. payment of principal and interest.
Aset keuangan diklasifikasikan dalam dua Financial assets are classified in the two
kategori sebagai berikut: categories as follows:
• Aset keuangan yang diukur dengan • Financial assets at amortised cost.
biaya diamortisasi.
• Aset keuangan yang diukur dengan nilai • Financial assets at Fair Value Through
wajar melalui laba rugi atau melalui Profit and Loss (FVTPL) or Other
penghasilan komprehensif lain. Comprehensive Income (FVOCI).
Grup menentukan klasifikasi aset keuangan The Group determines the classification of
tersebut pada pengakuan awal dan tidak its financial assets at initial recognition and
bisa melakukan perubahan setelah can not change the classification already
pengakuan awal tersebut. made at initial recognition.
Pada pengakuan awal, Grup mengukur aset At initial recognition, the Group measures a
keuangan pada nilai wajarnya ditambah, financial asset at its fair value plus, in the
dalam hal aset keuangan tidak diukur pada case of a financial asset not at fair value
nilai wajar melalui laporan laba rugi, biaya through profit or loss, transaction costs that
transaksi yang dapat diatribusikan secara are directly attributable to the acquisition of
langsung dengan perolehan aset keuangan. the financial asset. Transaction costs of
Biaya transaksi aset keuangan yang dicatat financial assets carried at fair value through
pada nilai wajar melalui laba rugi dibebankan profit or loss are expensed in profit or loss.
pada laba rugi.
Pembelian atau penjualan aset keuangan Purchases or sales of financial assets that
yang memerlukan penyerahan aset dalam require delivery of assets within a time frame
kurun waktu yang ditetapkan oleh peraturan established by regulation or convention in
atau kebiasaan yang berlaku di pasar the market place (regular way trades) are
(perdagangan yang lazim) diakui pada recognized on the trade date, i.e., the date
tanggal perdagangan, yaitu pada tanggal that the Group commits to purchase or sell
Grup berkomitmen untuk membeli atau the assets.
menjual aset tersebut.
Aset keuangan Grup meliputi kas dan setara The Group’s financial assets include cash
kas, piutang usaha dan piutang lainnya, and cash equivalents, trade and other
piutang pihak berelasi, aset lancar lain-lain, receivables, due from related parties, other
dan aset keuangan tidak lancar lainnya current assets and other non-current
(instrumen keuangan yang memiliki dan financial assets (quoted and unquoted
tidak memiliki kuotasi harga). Aset keuangan financial instruments). Financial assets in
diklasifikasikan sebagai aset lancar, jika this category are classified as current assets
jatuh tempo dalam waktu 12 bulan, jika tidak if expected to be settled within 12 months,
maka aset keuangan ini diklasifikasikan otherwise they are classified as non-current.
sebagai aset tidak lancar.
Pengukuran setelah pengakuan awal Subsequent measurement
Pengukuran aset keuangan setelah The subsequent measurement of financial
pengakuan awal tergantung pada assets depends on their classification as
klasifikasinya sebagai berikut: follows:
• Aset keuangan yang diukur dengan • Financial assets at amortised cost.
biaya diamortisasi.
Aset keuangan yang diukur dengan Financial assets at amortized cost are
biaya diamortisasi selanjutnya diukur subsequently measured using the
dengan menggunakan metode suku Effective Interest Rate (“EIR”) method,
bunga efektif (Effective Interest Rate) less impairment. Amortized cost is
(“EIR”), setelah dikurangi dengan calculated by taking into account any
penurunan nilai. Biaya perolehan yang discount or premium on acquisition fees
diamortisasi dihitung dengan or costs that are an integral part of the
memperhitungkan diskonto atau premi EIR. The EIR amortization is included in
- 39 -
Page 37
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
atas biaya akuisisi atau biaya yang the profit or loss. The losses arising from
merupakan bagian integral dari EIR impairment are also recognized in the
tersebut. Amortisasi EIR dicatat dalam profit or loss.
laporan laba rugi. Kerugian yang timbul
dari penurunan nilai juga diakui pada
laporan laba rugi.
• Aset keuangan yang diukur pada nilai • Financial assets at fair value through
wajar melalui laporan laba rugi. profit or loss
Aset keuangan yang diukur pada nilai Financial assets at fair value through
wajar melalui laporan laba rugi profit or loss are subsequently carried in
selanjutnya disajikan dalam laporan the statement of financial position at fair
posisi keuangan sebesar nilai wajar, value, with changes in fair value
dengan perubahan nilai wajar yang recognized in the profit or loss.
diakui dalam laporan laba rugi.
Grup memiliki investasi dalam instrumen The Group has investments in equity
ekuitas, yang diklasifikasikan sebagai aset instruments, which are classified as financial
keuangan yang diukur pada nilai wajar asset at fair value through profit and loss.
melalui laba rugi.
2. Liabilitas keuangan 2. Financial
2 liabilities
Pengakuan awal Initial recognition
Liabilitas keuangan dalam lingkup PSAK 71 Financial liabilities within the scope of PSAK
diklasifikasikan sebagai berikut: 71 are classified as follows:
• Liabilitas keuangan yang diukur dengan • Financial assets at amortised cost.
biaya diamortisasi.
• Liabilitas keuangan yang diukur dengan • Financial liabilities at Fair Value Through
nilai wajar melalui laba rugi atau melalui Profit and Loss (FVTPL) or Other
penghasilan komprehensif lain. Comprehensive Income (FVOCI).
Grup menentukan klasifikasi liabilitas The Group determines the classification of
keuangan mereka pada saat pengakuan its financial liabilities at initial recognition.
awal.
Seluruh liabilitas keuangan diakui pada All financial liabilities are recognized initially
awalnya sebesar nilai wajar dan, dalam hal at fair value and, in the case of loans and
pinjaman dan utang, termasuk biaya borrowings, inclusive of directly attributable
transaksi yang dapat diatribusikan secara transaction costs.
langsung.
Liabilitas keuangan Grup meliputi utang The Group’s financial liabilities include trade
usaha, utang pengadaan, akrual, pinjaman payables, procurement payable, accruals,
dan utang obligasi, utang pihak berelasi, loans and bonds payable, due to related
uang muka kontrak, liabilitas keuangan parties, deposits from contract, and other
jangka pendek, dan jangka panjang lain-lain. current and non-current financial liabilities.
Liabilitas keuangan diklasifikasikan sebagai Financial liabilities are classified as non
liabilitas jangka panjang jika jatuh tempo current liabilities when the remaining
melebihi 12 bulan dan sebagai liabilitas maturity is more than 12 months, and as
jangka pendek jika jatuh tempo yang tersisa current liabilities when the remaining
kurang dari 12 bulan. maturity is less than 12 months.
Pengukuran setelah pengakuan awal Subsequent measurement
Liabilitas keuangan yang diukur dengan Financial liabilities at amortized cost
biaya diamortisasi.
Liabilitas keuangan yang diukur pada biaya Financial liabilities at amortized cost (e.g
amortisasi (misalnya pinjaman dan utang interest-bearing loans and borrowings) are
yang dikenakan bunga) selanjutnya diukur subsequently measured using the EIR
- 40 -
Page 38
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dengan menggunakan metode EIR. method. The EIR amortization is included in
Amortisasi EIR termasuk di dalam biaya finance costs in the profit or loss.
keuangan dalam laporan laba rugi.
Keuntungan atau kerugian diakui dalam Gains or losses are recognized in the profit
laporan laba rugi pada saat liabilitas tersebut or loss when the liabilities are derecognized
dihentikan pengakuannya serta melalui as well as through the EIR amortization
proses amortisasi EIR. process.
Sukuk diakui sebesar nilai nominal, Sharia bond is recognized initially at nominal
disesuaikan dengan premium atau diskonto value, adjusted with premium or discount
dan biaya transaksi terkait. Perbedaan and the related transaction costs incurred.
antara nilai tercatat dan nilai nominal diakui Any differences between carrying amount
pada laporan laba rugi sebagai beban and nominal value is recognized in the profit
transaksi sukuk menggunakan metode garis or loss as sharia bond transaction costs
lurus selama jangka waktu sukuk. using the straight-line method during the
period of sharia bond.
Imbal hasil terkait dibebankan dalam laporan The related return element is charged to the
laba rugi sebagai biaya keuangan. profit or loss as finance cost.
Sukuk, setelah disesuaikan dengan Sharia bond, adjusted with unamortized
premium atau diskonto dan biaya transaksi premium or discount and transaction costs,
yang belum diamortisasi, disajikan sebagai is presented as part of liabilities.
bagian dari liabilitas.
3. Instrumen keuangan disalinghapus 3. Offsetting
2 of financial instruments
Aset keuangan dan liabilitas keuangan Financial assets and financial liabilities are
disalinghapus dan nilai bersihnya disajikan offset and the net amount reported in the
dalam laporan posisi keuangan jika, dan statement of financial position if, and only if,
hanya jika, entitas saat ini memiliki hak yang there is a currently enforceable legal right to
dapat dipaksakan secara hukum untuk offset the recognized amounts and there is
melakukan saling hapus atas jumlah yang an intention to settle on a net basis, or to
telah diakui dan berniat untuk realize the assets and settle the liabilities
menyelesaikan secara neto, atau untuk simultaneously. The legally enforceable right
merealisasikan aset dan menyelesaikan must not be contingent on future events and
kewajibannya secara simultan. Hak yang must be enforceable in the normal course of
berkekuatan hukum tersebut tidak harus business and in the event of default,
bergantung pada kejadian masa depan dan insolvency or bankruptcy of the Group or the
harus dapat dilaksanakan dalam kegiatan counterparty.
usaha normal dan dalam hal gagal bayar,
pailit atau kebangkrutan dari Grup atau pihak
lawan.
4. Penurunan nilai dari aset keuangan 4. Impairment
2 of financial assets
Untuk piutang dagang dan aset kontrak For trade receivables and contract assets
tanpa komponen pendanaan yang without significant financing component, the
signifikan, Grup menerapkan pendekatan Group applies the simplified approach
yang disederhanakan yang diizinkan oleh permitted by PSAK 71, which requires
PSAK 71, yang mensyaratkan kerugian expected lifetime losses to be recognized
ekspektasian sepanjang umur piutang harus from initial recognition of the receivables.
diakui sejak pengakuan awal piutang.
5. Penghentian pengakuan aset dan 5. Derecognition
2 of financial assets and
liabilitas keuangan liabilities
Aset keuangan Financial assets
Aset keuangan (atau mana yang lebih tepat, A financial asset (or where applicable, a part
bagian dari aset keuangan atau bagian dari of a financial asset or part of a group of
kelompok aset keuangan serupa) dihentikan similar financial assets) is derecognized
pengakuannya pada saat: (1) hak when: (1) the contractual rights to the cash
kontraktual arus kas yang berasal dari aset flows from the financial assets expire; or (2)
- 41 -
Page 39
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
keuangan tersebut telah berakhir; atau (2) the Group has transferred its contractual
Grup telah mengalihkan hak kontraktual rights to receive the cash flows of the
mereka untuk menerima arus kas yang financial assets or retained the contractual
berasal dari aset keuangan atau memiliki rights to receive the cash flows of the
hak kontraktual untuk menerima arus kas financial asset, but assumes a contractual
yang berasal dari aset keuangan, tetapi juga obligation to pay the cash flows to one or
menanggung kewajiban kontraktual untuk more recipients.
membayar arus kas yang diterima tersebut
kepada satu atau lebih pihak penerima.
Liabilitas keuangan Financial liabilities
Liabilitas keuangan dihentikan A financial liability is derecognized when the
pengakuannya pada saat liabilitas tersebut obligation under the liability is discharged or
berakhir atau dibatalkan atau kadaluarsa. cancelled or has expired.
Dalam hal suatu liabilitas keuangan yang When an existing financial liability is
ada digantikan oleh liabilitas keuangan lain replaced by another from the same lender on
dari pemberi pinjaman yang sama dengan substantially different terms, or the terms of
persyaratan yang berbeda secara an existing liability are substantially modified,
substansial, atau modifikasi secara such an exchange or modification is treated
substansial atas persyaratan dari suatu as a derecognition of the original liability and
liabilitas yang ada, pertukaran atau the recognition of a new liability, and the
modifikasi tersebut diperlakukan sebagai difference in the respective carrying amounts
penghentian pengakuan liabilitas awal dan is recognized in the profit or loss.
pengakuan liabilitas baru, dan selisih antara
nilai tercatat masing-masing liabilitas diakui
dalam laporan laba rugi.
6. Nilai wajar instrumen keuangan 6. Fair
2 value of financial instruments
Grup menilai instrumen keuangan, sebesar The Group measures financial instruments,
nilai wajar pada setiap tanggal laporan posisi at fair value at each statement of financial
keuangan. position date.
Nilai wajar adalah harga yang akan diterima Fair value is the price that would be received
untuk menjual suatu aset atau harga yang to sell an asset or paid to transfer a liability in
akan dibayar untuk mengalihkan suatu an orderly transaction between market
liabilitas dalam transaksi teratur antara participants at the measurement date. The
pelaku pasar pada tanggal pengukuran. fair value measurement is based on the
Pengukuran nilai wajar mengasumsikan presumption that the transaction to sell the
bahwa transaksi untuk menjual aset atau asset or transfer the liability takes place
mengalihkan liabilitas terjadi: either:
• Di pasar utama untuk aset dan liabilitas • In the principal market for the asset and
tersebut, atau liability, or
• Jika tidak terdapat pasar utama, di pasar • In the absence of a principal market, in
yang paling menguntungkan untuk aset the most advantageous market for the
atau liabilitas tersebut. asset or liability.
Grup harus memiliki akses ke pasar utama The principal or the most advantageous
atau pasar yang paling menguntungkan. market must be accessible to by the Group.
Nilai wajar aset atau liabilitas diukur The fair value of an asset or a liability is
menggunakan asumsi yang akan digunakan measured using the assumptions that
pelaku pasar ketika menentukan harga aset market participants would use when pricing
atau liabilitas tersebut, dengan asumsi the asset or liability, assuming that market
bahwa pelaku pasar utamanya bertindak participants act in their economic best
untuk kepentingan ekonomi terbaik mereka. interest.
Pengukuran nilai wajar atas aset non- A fair value measurement of a non-financial
keuangan memperhitungkan kemampuan asset takes into account a market
pelaku pasar dalam menghasilkan manfaat participant's ability to generate economic
ekonomi tertinggi dalam penggunaan aset benefits by using the asset in its highest and
atau dengan menjualnya kepada pelaku best use or by selling it to another market
- 42 -
Page 40
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
pasar lain yang akan menggunakan aset participant that would use the asset in its
tersebut secara maksimal. highest and best use.
Grup menggunakan teknik penilaian yang The Group uses valuation techniques that
sesuai dengan keadaan dan dimana data are appropriate in the circumstances and for
memadai tersedia untuk mengukur nilai which sufficient data are available to
wajar, memaksimalkan penggunaan input measure fair value, maximizing the use of
yang dapat diobservasi yang relevan dan relevant observable inputs and minimizing
meminimalkan penggunaan input relevan the use of unobservable inputs.
yang tidak dapat diobservasi.
Semua aset dan liabilitas dimana nilai wajar All assets and liabilities for which fair value is
diukur atau diungkapkan dalam laporan measured or disclosed in the financial
keuangan dapat dikategorikan pada level statements are categorized within the fair
hierarki nilai wajar, sebagaimana dijelaskan value hierarchy, described as follows, based
di bawah ini, berdasarkan tingkatan input on the lowest level input that is significant to
terendah yang signifikan atas pengukuran the fair value measurement as a whole:
nilai wajar secara keseluruhan:
• Level 1 - Harga kuotasian (tanpa • Level 1 - Quoted (unadjusted) market
penyesuaian) di pasar aktif untuk aset prices in active markets for identical
atau liabilitas yang identik; assets or liabilities;
• Level 2 - Teknik penilaian dimana input • Level 2 - Valuation techniques for which
level terendah yang signifikan terhadap the lowest level input that is significant to
pengukuran nilai wajar yang dapat the fair value measurement is directly or
diobservasi baik secara langsung atau indirectly observable;
tidak langsung;
• Level 3 - Teknik penilaian dimana input • Level 3 - Valuation techniques for which
level terendah yang signifikan terhadap the lowest level input that is significant to
pengukuran yang tidak dapat the fair value measurement is
diobservasi. unobservable.
Untuk aset dan liabilitas yang diakui sebesar For assets and liabilities that are recognized
nilai wajar dalam laporan keuangan secara at fair value in the financial statements on a
berulang, Grup menentukan apakah terjadi recurring basis, the Group determines
transfer antara Level di dalam hierarki whether transfers have occurred between
dengan cara mengevaluasi kategori Levels in the hierarchy by re-assessing
(berdasarkan input level terendah yang categorization (based on the lowest level
signifikan dalam pengukuran nilai wajar input that is significant to the fair value
secara keseluruhan) pada setiap akhir measurement as a whole) at the end of each
periode pelaporan. reporting period.
Untuk tujuan pengungkapan nilai wajar, For the purpose of fair value disclosures, the
Grup telah menentukan kategori aset dan Group has determined classes of assets and
liabilitas berdasarkan sifat, karakteristik, dan liabilities on the basis of the nature,
risiko dari aset atau liabilitas tersebut, dan characteristics and risks of the asset or
level hierarki nilai wajar seperti dijelaskan di liability and the level of the fair value
atas. hierarchy as explained above.
Penyesuaian risiko kredit Credit risk adjustment
Grup melakukan penyesuaian harga dalam The Group adjusts the price in the more
kondisi pasar yang lebih menguntungkan advantageous market to reflect any
untuk mencerminkan adanya perbedaan differences in counterparty credit risk
risiko kredit di pihak lawan antara instrumen between instruments traded in that market
yang diperdagangkan di pasar tersebut and the ones being valued for financial asset
dengan instrumen yang sedang dinilai untuk positions. In determining the fair value of
posisi aset keuangan. Dalam menentukan financial liability positions, the Group's own
nilai wajar liabilitas keuangan, risiko kredit credit risk associated with the instrument is
Grup terkait dengan instrumen harus taken into account.
diperhitungkan.
- 43 -
Page 41
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
i. Kas dan Setara Kas i. Cash and Cash Equivalents
Kas dan setara kas termasuk kas, kas di bank Cash and cash equivalents are cash on hand,
(rekening giro), dan deposito berjangka yang cash in banks (demand deposits) and time
jatuh tempo dalam jangka waktu tiga bulan atau deposits with maturity periods of three months or
kurang pada saat penempatan yang tidak less at the time of placement that are not used as
digunakan sebagai jaminan atau tidak dibatasi collateral or are not restricted.
penggunaannya.
Rekening yang dibatasi penggunaannya dan Current accounts which are restricted and or
atau digunakan sebagai jaminan diklasifikasi used as security are classified as current assets
sebagai bagian aset lancar jika jatuh temponya when the maturities are less than 12 months after
kurang dari 12 bulan setelah akhir periode the end of reporting period.
pelaporan.
j. Bank yang Dibatasi Penggunaannya j. Restricted Bank
Rekening bank yang dijaminkan atau dibatasi Current bank accounts which are used as
penggunaannya, disajikan sebagai rekening collateral or are restricted, are presented as
bank yang dibatasi penggunaannya. restricted cash in bank.
k. Investasi Jangka Pendek k. Short-Term Investment
Deposito berjangka yang jatuh temponya kurang Time deposits with maturity of less than three
dari tiga bulan pada saat penempatan namun months from the date of placement and pledged
dijaminkan, atau telah ditentukan as collateral, or restricted and time deposits with
penggunaannya dan deposito berjangka yang maturity of more than three months from
jatuh temponya lebih dari tiga bulan setelah the date of placement is presented as short- term
tanggal penempatan disajikan sebagai investasi investment. The time deposits are presented
jangka pendek. Deposito berjangka disajikan using par value.
berdasarkan nilai nominal.
l. Piutang Retensi l. Retention Receivables
Piutang retensi merupakan piutang Grup kepada Retention receivable represents the Group’s
pemberi kerja yang akan dilunasi setelah receivable from the owner of the project which
penyelesaian kontrak atau pemenuhan kondisi will be paid after completion of the contract or
yang ditentukan kontrak. Piutang retensi dicatat fulfillment of certain conditions in the contract.
pada saat pemotongan sejumlah persentase Retention receivable is recorded at certain
tertentu dari setiap tagihan termin untuk ditahan percentage applied in every account receivable’s
oleh pemberi kerja sampai suatu kondisi setelah claim which is retained by the owner of the
penyelesaian kontrak dipenuhi. project up to certain condition after completion of
the contract has been met.
m. Tagihan Bruto kepada Pengguna Jasa m. Gross Amount Due from Customers
Tagihan bruto kepada pemberi kerja merupakan Gross amount due from customers represents
piutang Grup yang berasal dari pekerjaan the Group’s receivable originated from
kontrak konstruksi yang dilakukan namun construction contract in progress. Gross amount
pekerjaan yang dilakukan masih dalam due from customers is presented as the net
pelaksanaan. Tagihan bruto disajikan sebesar amount of costs incurred plus recognized profits,
selisih antara biaya yang terjadi ditambah laba minus the sum of recognized losses and
yang diakui dikurangi dengan kerugian yang progress billings.
diakui dan termin.
Tagihan bruto diakui sebagai pendapatan sesuai Gross amount due from customers is recognized as
dengan metode persentase penyelesaian yang revenue based on the percentage of completion
dinyatakan dalam berita acara penyelesaian method which is stated on the certificate of work
pekerjaan, dimana faktur belum dapat ditagihkan completion, while the invoice is still unbilled due to
karena perbedaan antara tanggal berita acara the difference between the date of physical
kemajuan (progress) fisik dengan pengajuan progress certificates and the submission of billing
penagihan pada tanggal laporan posisi on the consolidated statement of financial position
keuangan konsolidasian. date.
- 44 -
Page 42
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
n. Biaya Dibayar Dimuka n. Prepaid Expenses
Biaya dibayar dimuka merupakan biaya yang Prepaid expenses are in costs that have been
telah dibayar namun pembebanannya baru akan paid but will be incurred future periods, such as
dilakukan pada periode yang akan datang, prepaid insurance premiums, prepaid interest
seperti premi asuransi dibayar dimuka, bunga and rent paid in advance. Prepaid expenses are
dibayar dimuka, dan sewa dibayar dimuka. Biaya amortized over the periods of benefit using
dibayar dimuka diamortisasi sesuai dengan the straight-line method.
masa manfaatnya dengan menggunakan
metode garis lurus.
o. Persediaan o. Inventories
Persediaan dinyatakan berdasarkan jumlah Inventories are carried at the lower of cost and
terendah antara biaya perolehan dan nilai net realizable value. The cost of inventories
realisasi neto. Biaya perolehan terdiri dari comprises all costs incurred in bringing
seluruh biaya lain yang timbul sampai the inventories to their present location and
persediaan berada dalam kondisi dan lokasi saat condition. Cost is determined using first-in first-
ini. Biaya perolehan ditentukan dengan metode out method (FIFO). Net realizable value is
masuk pertama keluar pertama (FIFO). Nilai the estimated selling price in the ordinary course
realisasi neto merupakan taksiran harga jual of business minus the estimated costs of
dalam kegiatan usaha biasa dikurangi estimasi completion and the estimated costs necessary to
biaya penyelesaian dan estimasi biaya yang make the sale.The cost of precast inventories
diperlukan untuk membuat penjualan. Biaya comprises of cost of purchases, cost of
persediaan produk pracetak terdiri dari seluruh conversion, direct labor and attributable
biaya pembelian, biaya konversi, tenaga kerja production overheads based on normal levels of
langsung, dan biaya overhead produksi activity.
berdasarkan tingkat aktivitas normal.
Sejak tahun 2021, Grup menggunakan teknik Since 2021, the Group has used the technique of
pengukuran biaya persediaan dengan metode measuring inventory costs using the standard
biaya standar. Beban varians dari biaya standar cost method. The variance load from standard
merupakan evaluasi atas jumlah normal atau costs is an evaluation of the normal or abnormal
tidak normal atas biaya produksi. Selanjutnya amount in production costs. Furthermore,
beban varians dari persediaan dikeluarkan dari variance expenses from inventories which are
beban persediaan dan diakui sebagai beban excluded from inventory expenses and
usaha dalam periode terjadinya meliputi: recognized as operating expenses in the period
in which they occur include:
a. Jumlah yang tidak normal atas bahan, a. Abnormal amounts of materials, labor or
tenaga kerja atau biaya produksi lainnya. other production costs.
b. Biaya penyimpanan kecuali biaya tersebut b. Storage costs unless these costs are needed
diperlukan dalam proses produksi sebelum in the production process before proceeding
dilanjutkan pada tahap produksi selanjutnya. to the next stage of production.
c. Biaya administrasi dan umum yang tidak c. General and administrative expenses that do
memberikan konstribusi untuk membuat not contribute to keeping the inventory in its
persediaan berada dalam kondisi dan lokasi current state and location.
saat ini.
d. Biaya penjualan. d. Sales costs.
Persediaan tanah kavling untuk usaha sarana Inventory of plots of land for housing facilities
perumahan dinilai dengan menggunakan harga business are assessed using the acquisition cost
beli ditambah dengan biaya lain-lain yang plus other expenditures incurred to make the land
dikeluarkan sampai dengan tanah tersebut siap ready for sale (with certificate).
dijual (bersertifikat).
Persediaan material dinyatakan sebesar nilai Material inventories and precast inventories are
yang lebih rendah antara harga perolehan stated at the lower of the cost or net realizable
dengan nilai realisasi bersih dan persediaan value.
precast pun menggunakan metode yang sama.
Penyisihan penurunan nilai persediaan diakui Allowance for decline in value of inventories is
berdasarkan kondisi fisik persediaan dan recognized based on physical conditions of
- 45 -
Page 43
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
persediaan yang bergerak lambat dengan the inventories and slow-moving inventories
mempertimbangkan manfaat masa depan dan taking into account future benefits and net
nilai realisasi bersih. realizable value.
p. Aset Tetap p. Fixed Assets
Aset tetap dipertanggungjawabkan dengan Fixed assets are accounted for using cost model
menggunakan model biaya dan dinyatakan and is stated based on acquisition cost minus
berdasarkan biaya perolehan setelah dikurangi the accumulated depreciation and accumulated
akumulasi penyusutan. Aset tetap, kecuali tanah, impairment losses, if any. Fixed assets, except
disusutkan dengan metode saldo menurun for land, are depreciated using the double-
ganda dan garis lurus (untuk gedung dan declining method and straight-line method (for
bangunan). plants and buildings).
Aset tetap tanah dan bangunan dinyatakan Land and buildings are stated at their revalued
berdasarkan nilai revaluasi yang merupakan nilai amounts, being the fair value at the date of
wajar pada tanggal revaluasi dikurangi revaluation, less any subsequent accumulated
akumulasi penyusutan dan akumulasi rugi depreciation and subsequent accumulated
penurunan nilai yang terjadi setelah tanggal impairment losses. Revaluation is made with
revaluasi. Revaluasi dilakukan dengan sufficient regularity to ensure that the carrying
keteraturan yang memadai untuk memastikan amount does not differ materially from
bahwa jumlah tercatat tidak berbeda secara the amount determined using fair value at
material dari jumlah yang ditentukan dengan the reporting date.
menggunakan nilai wajar pada tanggal laporan.
Kenaikan yang berasal dari revaluasi tanah dan Any revaluation increase arising on
bangunan diakui pada penghasilan the revaluation of such land and buildings is
komprehensif lain dan terakumulasi dalam recognized in other comprehensive income and
ekuitas pada bagian surplus revaluasi, kecuali accumulated in equity under revaluation surplus,
sebelumnya penurunan revaluasi atas aset yang except to the extent that it reverses a revaluation
sama pernah diakui dalam laba rugi, dalam hal decrease, for the same asset which was
ini kenaikan revaluasi hingga sebesar penurunan previously recognized in profit or loss, in this case
nilai aset akibat revaluasi tersebut, dikreditkan the increase is credited to profit or loss to the
dalam laba rugi. Penurunan jumlah tercatat yang extent of the decrease previously charged. A
berasal dari revaluasi tanah dan bangunan decrease in carrying amount arising on the
dibebankan dalam laba rugi apabila penurunan revaluation of such land and buildings is charged
tersebut melebihi saldo surplus revaluasi aset to profit or loss to the extent that it exceeds the
yang bersangkutan, jika ada. balance, if any.
Aset tetap tanah tidak disusutkan. Sedangkan Fixed asset lands are not depreciated. While
aset tetap gedung disusutkan dengan metode building assets are depreciated using
garis lurus selama masa manfaat aset tersebut, the straight line method based on their estimated
sebagai berikut: useful lives, as follows:
Masa Manfaat/
Useful Lives
Gedung dan Pabrik 20 Tahun/ Year Buildings and Plant
Aset tetap kecuali tanah dan bangunan Fixed assets except for land and buildings are
dinyatakan berdasarkan biaya perolehan stated for using cost less accumulated
dikurangi akumulasi penyusutan, dan akumulasi depreciation and accumulated impairment
penurunan nilai jika ada, dan disusutkan dengan losses, if there is any, and depreciated using
menggunakan metode saldo menurun berganda the double declining method based on
selama taksiran masa manfaat ekonomis aset the estimated useful life of the fixed assets as
tetap sebagai berikut: follows:
Masa Manfaat/
Useful Lives
Kendaraan 8 Tahun/ Year Vehicles
Perlengkapan Kantor 2 - 8 Tahun/ Year Office Supplies
Peralatan Proyek 4 - 16 Tahun/ Year Project Equipment
- 46 -
Page 44
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Beban pemeliharaan dan perbaikan dibebankan The cost of maintenance and repairs is charged
pada laporan laba rugi pada saat terjadinya. to profit or loss as incurred. Other costs incurred
Biaya- biaya lain yang terjadi selanjutnya yang subsequently to add to, replace part of, or service
timbul untuk menambah, mengganti atau an item of property, plant and equipment, are
memperbaiki aset tetap dicatat sebagai biaya recognized as asset if, and only if it is probable
perolehan aset jika dan hanya jika besar that future economic benefits associated with the
kemungkinan manfaat ekonomis di masa depan item will flow to the entity and the cost of the item
berkenaan dengan aset tersebut akan mengalir can be measured reliably.
ke entitas dan biaya perolehan aset dapat diukur
secara andal.
Jumlah tercatat aset tetap dihentikan The carrying amount of fixed assets is
pengakuannya pada saat dilepaskan atau saat derecognized upon disposal or when no future
tidak ada manfaat ekonomis masa depan yang economic benefits are expected from its use or
diharapkan dari penggunaan atau pelepasannya. disposal. Any profit or loss arising on
Laba atau rugi yang timbul dari penghentian derecognition of the asset (calculated as
pengakuan aset (dihitung sebagai perbedaan the difference between the net disposal proceeds
antara jumlah neto hasil pelepasan dan jumlah and the carrying amount of the asset) is included
tercatat dari aset) dimasukkan dalam laba rugi in the profit or loss for the period when the assets
pada periode aset tersebut dihentikan are derecognized.
pengakuannya.
Pada akhir periode/ tahun buku pelaporan, Grup At the end of reporting period the Group
melakukan penelaahan berkala atas masa periodically reviews the useful lives of
manfaat ekonomis aset, nilai residu, metode the assets, asset’s residual value, depreciation
penyusutan, dan sisa umur pemakaian method and the remaining usage expectation
berdasarkan spesifikasi teknis. based on technical specification.
Aset dalam penyelesaian dinyatakan sebesar Construction in progress is stated at cost and will
biaya perolehan, dan akan dipindahkan ke aset be reclassified to the respective fixed assets
tetap pada saat sudah selesai pembangunannya when completed and ready to use.
dan siap digunakan.
q. Properti Investasi q. Investment Properties
Properti investasi adalah properti (tanah atau Investment properties are properties (land or a
bangunan atau bagian dari suatu bangunan atau building or part of a building or both) held by
kedua-duanya) yang dikuasai oleh pemilik atau the owner or the lessee under a finance lease to
penyewa melalui sewa pembiayaan untuk earn rentals or for capital appreciation or both,
menghasilkan sewa atau untuk kenaikan nilai rather than for use in the production or supply of
atau kedua-duanya, dan tidak untuk digunakan goods or services or for administrative purposes;
dalam produksi atau penyediaan barang atau or sale in daily business activities.
jasa atau untuk tujuan administratif; atau dijual
dalam kegiatan usaha sehari-hari.
Properti investasi diakui sebagai aset jika dan Investment property is recognized as an asset
hanya jika besar kemungkinan manfaat ekonomi when, and only when it is probable that
masa depan yang terkait dengan properti the future economic benefits that are associated
investasi akan mengalir ke entitas; dan biaya with the investment property will flow to
perolehan properti investasi dapat diukur dengan the entity; and the cost of the investment property
andal. can be measured reliably.
Properti investasi pada awalnya diukur sebesar An investment property shall be measured
biaya perolehan, meliputi harga harga pembelian initially at its cost, which comprises its purchase
dan setiap pengeluaran yang dapat diatribusikan price and any directly attributable expenditure
secara langsung (biaya jasa hukum, pajak (professional fees for legal services, property
pengalihan properti dan biaya transaksi lain). transfer taxes and other transaction costs).
Biaya transaksi termasuk dalam pengukuran Transaction costs are included in the initial
awal tersebut. measurement.
Setelah pengakuan awal, Grup memilih After initial recognition, the Group chooses to use
menggunakan model nilai wajar dan mengukur fair value model and measure all of its investment
seluruh properti investasi berdasarkan nilai property at fair value. A gain or loss arising from
wajar. Keuntungan atau kerugian yang timbul a change in the fair value of investment property
- 47 -
Page 45
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dari perubahan nilai wajar properti investasi is recognized in profit or loss for the period in
diakui dalam laba rugi pada periode terjadinya. which it arises.
Penentuan nilai wajar investasi didasarkan pada The fair value of investment property is based on
penilaian oleh penilai independen yang a valuation by an independent appraiser who
mempunyai kualifikasi profesional yang telah holds a recognized and relevant professional
diakui dan relevan serta memiliki pengalaman qualification and has recent experience in
terkini di lokasi dan kategori properti investasi the location and category of the investment
yang dinilai. property being valued.
Pengalihan ke properti investasi dilakukan, jika The transfer to investment property is made, if
dan hanya jika, terdapat perubahan penggunaan and only if, there is a change in use, evidenced
yang ditunjukkan dengan berakhirnya by the end of owner-occupation and
pemakaian oleh pemilik dan dimulainya sewa commencement of an operating lease to another
operasi kepada pihak lain. party.
Pengalihan dari properti investasi dilakukan, jika The transfer from investment property is made, if
dan hanya jika, terdapat perubahan penggunaan and only if, there is a change in use, evidenced
yang ditunjukkan dengan dimulainya by the commencement of owner- occupation and
penggunaan oleh pemilik dan dimulainya commencement of development with a view to
pengembangan untuk dijual. sell.
Properti investasi dihentikan pengakuannya An investment property is derecognized on
pada saat dilepaskan atau ketika tidak digunakan disposal or when the investment property is
lagi secara permanen dan tidak memiliki manfaat permanently withdrawn from use and no future
ekonomi masa depan yang diperkirakan dari economic benefits are expected from its
pelepasannya. Keuntungan atau kerugian yang disposal. Gains or losses arising from
timbul dari penghentian atau pelepasan the retirement or disposal are determined as
ditentukan dari selisih antara hasil neto the difference between the net disposal proceeds
pelepasan dan jumlah tercatat aset, dan diakui and the carrying amount of the asset, and are
dalam laba rugi pada periode terjadinya recognized in profit or loss in the period of the
penghentian atau pelepasan. retirement or disposal.
r. Aset Lain-lain r. Other Assets
Akun-akun yang tidak dapat digolongkan dalam Accounts that cannot be classified into current
aset lancar, investasi, maupun aset tidak assets, investment, or intangible assets are
berwujud disajikan dalam aset lain-lain. presented as other assets.
Beban tangguhan berupa hak atas tanah dicatat Deferred expense such as land right is recorded
sebesar biaya perolehan hak atau biaya at cost of acquisition or cost of renewal right. All
pembaharuan hak. Semua beban tangguhan deferred expense of right is amortized over useful
terkait hak diamortisasi sepanjang umur hukum life or economic life of land, whichever is shorter.
hak atau umur ekonomis aset tanah, yang mana
yang lebih pendek.
s. Perjanjian Konsesi Jasa s. Service Concession Arrangement
Grup telah menerapkan ISAK 16, “Perjanjian The Group has adopted ISAK 16, “Service
Konsesi Jasa” (ISAK 16) dan ISAK 22, Concession Arrangement” (ISAK 16) and ISAK
“Perjanjian Konsesi Jasa Pengungkapan” 22, “Service Concession Arrangement:
(ISAK 22). Disclosure” (ISAK 22).
ISAK 16 mengatur prinsip umum dalam ISAK 16 determines the general principles in
pengakuan dan pengukuran hak dan kewajiban the recognition and measurement of rights and
terkait dengan perjanjian konsesi jasa. ISAK 16 liabilities related to service concession
mengatur bahwa infrastruktur tidak diakui arrangement. ISAK 16 regulates that an operator
sebagai aset tetap operator (pihak penerima (concession right beneficiary) does not recognize
konsesi jasa) karena perjanjian jasa kontraktual any infrastructure assets because
tidak memberikan hak kepada operator untuk the contractual service arrangement does not
mengendalikan penggunaan infrastruktur jasa convey the right to control the use of the public
publik. Operator memiliki akses untuk service infrastructure to the operator.
mengoperasikan infrastruktur dalam The operator has access to operate
menyediakan jasa publik untuk kepentingan the infrastructure to provide public service on
- 48 -
Page 46
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
pemberi konsesi sesuai dengan persyaratan behalf of the grantor in accordance with
yang ditentukan dalam kontrak. the terms specified in the contract.
ISAK 22 memberikan panduan spesifik ISAK 22 provides specific guidance for
mengenai pengungkapan yang diperlukan atas the required disclosures regarding the service
perjanjian konsesi jasa. concession arrangement.
Grup membukukan perjanjian konsesi jasa The Group accounts for its service concession
sebagai model aset tak berwujud karena memiliki arrangement under the intangible asset model as
hak (lisensi) untuk membebankan pengguna jasa it receives the right (license) to charge users of
publik. Pada saat pengakuan awal, aset konsesi public service. At initial recognition, concession
dicatat pada nilai wajar dari imbalan yang assets are recorded at the fair value of the benefit
diterima atau akan diterima. Aset konsesi ini received or to be received. These concession
adalah aset hak pengelolaan jalan tol yang akan assets are toll road concession rights which will
diamortisasi selama sisa masa hak konsesi sejak be amortized over the remaining concession
tanggal pengoperasian ruas jalan tol. Selama period from the date of operation of the toll road.
masa konstruksi, akumulasi biaya perolehan dan During the construction period,
konstruksi jalan tol diakui sebagai aset konsesi the accumulated toll road construction cost is
dalam penyelesaian. Amortisasi mulai recognized as concession assets in progress.
dibebankan pada saat aset konsesi tersebut siap The amortization of the cost starts when
digunakan. the concession assets are ready to be operated.
Aset konsesi akan dihentikan pengakuannya The concession assets are derecognized at
pada saat berakhirnya masa konsesi. Tidak akan the end of the concession period. There will be
ada keuntungan atau kerugian saat penghentian no gain or loss upon derecognition as
pengakuan karena aset konsesi diharapkan telah the concession assets which are expected to be
diamortisasi secara penuh, akan diserahkan fully amortized by then, will be handed over to
kepada Badan Pengatur Jalan Tol (BPJT) tanpa the Badan Pengatur Jalan Tol (BPJT) with no
syarat. consideration.
Aset konsesi yang diberikan kepada Grup dapat Concession assets granted to the Group are
dipindahkan dengan persetujuan Pemerintah/ transferrable with approval from the Government/
BPJT. Aset konsesi ini akan diserahkan ke BPJT. These concession right assets will be
Pemerintah/ BPJT pada saat akhir masa konsesi transferred to the Government/ BPJT at the end
dan, pada saat itu, seluruh akun yang of the concession period and, at that time, all
berhubungan dengan aset konsesi akan accounts related to the concession rights assets
dihentikan pengakuannya. will be derecognized.
Selama periode hak pengusahaan jalan tol, aset During the toll road concession rights period,
hak pengusahaan jalan tol dapat dikeluarkan dari the concession rights assets may be
laporan posisi keuangan konsolidasian Grup jika derecognized from the consolidated statement of
jalan tol diserahkan (dikuasakan) kepada pihak financial position of the Group if the toll road is
lain atau Pemerintah/ BPJT mengubah status transferred to another party or the Government/
jalan tol menjadi jalan non-tol atau tidak ada BPJT changes the status of the toll road to non-
manfaat ekonomi yang dapat diharapkan dari toll road or if there is no economic benefit
penggunaannya. Keuntungan atau kerugian expected from usage of the toll road. Gain or loss
yang timbul dari penghentian atau pelepasan from the discontinuance or disposal of
aset konsesi diakui sebagai keuntungan atau concession assets is recognized in the
kerugian dalam laporan laba rugi konsolidasian consolidated statement of profit or loss and other
dan penghasilan komprehensif lain consolidated comprehensive income.
konsolidasian.
Selain itu, Grup mengakui dan mengukur In addition, the Group recognizes and measures
pendapatan konstruksi sesuai dengan PSAK 72 construction revenues in accordance with PSAK
“Pendapatan dari Kontrak dengan Pelanggan”. 72, “Revenue from Contracts with Customers”.
Ketika Grup menyediakan jasa konstruksi atau When the Group provides construction services
peningkatan kemampuan, imbalan yang diterima or upgrades services, the consideration received
atau akan diterima oleh Grup diakui pada nilai or to be received by the Group is recognized at
wajar. its fair value.
Kontrak konstruksi meliputi seluruh biaya Construction contract comprises all the amounts
konstruksi pembangunan jalan tol atau of toll road construction costs or toll road capacity
peningkatan kapasitas jalan tol yang meliputi improvement consisting of land acquisition cost,
pengadaan tanah, studi kelayakan dan biaya- feasibility study cost and other costs that are
- 49 -
Page 47
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
biaya lain yang berhubungan langsung dengan directly attributable to the toll road construction,
pembangunan jalan tol, termasuk biaya including construction costs for access roads,
pembangunan jalan akses ke jalan tol, jalan alternative roads and required public road
alternatif dan fasilitas jalan umum yang facilities, interest and other borrowing costs,
disyaratkan, ditambah biaya pinjaman lain yang either directly or indirectly used for financing the
secara langsung maupun tidak langsung development of assets. These costs are
digunakan untuk mendanai proses capitalized until the construction is completed
pembangunan aset tersebut. Biaya pinjaman and the concession assets are ready to be
dikapitalisasi sampai dengan saat proses operated.
pembangunan tersebut telah selesai dan aset
konsesi telah siap untuk dioperasikan.
Grup mengakui biaya jasa konstruksi dan The Group recognizes construction services and
peningkatan kemampuan aset konsesi sebagai increased capacity of concession asset as
aset tak berwujud dimana Grup menerima hak intangible assets in which the Group receives
(lisensi) untuk membebankan pengguna jasa the rights (license) to charge users of public
publik. Suatu hak untuk membebankan services. A right to charge users of public
pengguna jasa publik bukan merupakan hak services is not an unconditional right to receive
tanpa syarat untuk menerima kas karena cash because the amounts depend on
jumlahnya bergantung pada sejauh mana publik the extent of the public using the service. During
menggunakan jasa. Selama periode konstruksi, the construction period, the Group records
Grup mencatat aset tak berwujud dan mengakui intangible assets, and recognizes revenues and
pendapatan dan biaya konstruksi sesuai dengan costs of construction in accordance to
kontraknya. Biaya konstruksi merupakan nilai the contract. Construction cost is the value of
dari jumlah perolehan kontrak konstruksi. acquisition of a construction contract.
Biaya bunga dan biaya pinjaman lainnya, seperti Interests and other borrowing costs, such as
diskonto baik yang secara langsung ataupun discount fees on loans either directly or indirectly
tidak langsung digunakan untuk mendanai used in financing the construction of a qualifying
proses pembangunan aset kualifikasian asset, are capitalized up to the date when the
(qualifying assets), dikapitalisasi sampai saat construction is completed. For borrowings
proses pembangunannya selesai. Untuk directly attributable to a qualifying asset, the
pinjaman yang dapat dihubungkan secara amount allowed to be capitalized is determined
langsung dengan suatu aset tertentu, jumlah as the actual borrowing costs incurred during the
yang dapat dikapitalisasi adalah sebesar biaya period, less any investment income earned from
pinjaman yang terjadi dalam periode berjalan, the temporary investment of such borrowings.
dikurangi dengan penghasilan investasi
sementara dari pinjaman tersebut.
Provisi Pelapisan Jalan Tol Provision for Toll Road Overlay
Dalam pengoperasian jalan tol, Grup mempunyai In operating toll roads, the Group is obligated to
kewajiban untuk menjaga kualitas sesuai dengan maintain quality in accordance with the SPM
Standar Pelayanan Minimum (SPM) yang (Minimum Service Standards) established by
ditetapkan oleh Kementerian Pekerjaan Umum the Ministry of Public Works of the Republic of
Republik Indonesia, yaitu antara lain dengan Indonesia, i.e., by perfoming toll road overlay
melakukan pelapisan ulang jalan tol secara regularly. The cost of this overlay is periodically
berkala. Biaya pelapisan ini akan dicadangkan provided based on estimated utilization of toll
secara berkala berdasarkan estimasi road by customers. The estimated net provision
penggunaan jalan tol oleh pelanggan. Provisi for toll road overlay is discounted to its present
pelapisan ulang jalan tol diukur dengan nilai kini value that reflects management estimates
atas estimasi manajemen terhadap pengeluaran against cost incurred to settle current provision.
yang diperlukan untuk menyelesaikan liabilitas
kini.
Aset jalan tol terdiri dari jalan dan jembatan, Toll road assets consisting of roads and bridges,
gerbang dan bangunan pelengkap jalan tol dan gates and complementary building toll roads and
sarana pelengkap jalan tol dicatat sebagai aset toll supplementary facilities are recorded as toll
hak pengusahaan jalan tol yang dinyatakan road concession rights which are stated at fair
sebesar nilai wajar pada tanggal revaluasian value at the revaluation date less accumulated
dikurangi akumulasi penyusutan dan akumulasi depreciation and accumulated impairment losses
rugi penurunan nilai yang terjadi setelah tanggal that occur after the date of revaluation.
revaluasi.
- 50 -
Page 48
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Amortisasi aset jalan dan jembatan dilakukan Amortization of asset roads and bridges is
dengan menggunakan metode unit produksi calculated using the unit of production
(jumlah lalu lintas kendaraan kendaraan) selama (the amount of vehicle traffic vehicles) during
masa hak pengusahaan jalan tol (masa konsesi). the period of the concession (concession period).
Sedangkan aset hak pengusahaan jalan tol While the toll road concession rights assets other
selain jalan dan jembatan diamortisasi selama than roads and bridges are amortized over the
periode yang lebih pendek antara masa hak shorter period between the period of concession
pengusahaan jalan tol (masa konsesi) dan umur (concession period) and the useful life of the
manfaat aset. asset.
Aset tak berwujud dihentikan pengakuannya jika Intangible assets are derecognized when
dilepas atau ketika tidak terdapat lagi manfaat removed or when there are no further future
ekonomi masa depan yang diperkirakan dari economic benefits are expected from its use or
penggunaannya atau pelepasannya. disposal. Gains or losses arising from
Keuntungan atau kerugian yang muncul dari derecognition of an intangible asset is
penghentian pengakuan aset tak berwujud determined as the difference between the net
ditentukan sebagai selisih antara hasil neto disposal proceeds (if any) and the carrying
pelepasan (jika ada) dan jumlah tercatat aset. amount of assets. Gains or losses are recognized
Keuntungan atau kerugian diakui dalam laba rugi in profit or loss when the asset is derecognized.
ketika aset tersebut dihentikan pengakuannya. Gains or loses are recognized as other income.
Keuntungan atau kerugian diakui sebagai
pendapatan lain-lain.
t. Penurunan Aset Non-Keuangan kecuali t. Impairment of Non-Financial Assets except
Goodwill Goodwill
Kebijakan akuntansi untuk penurunan nilai aset The accounting policy for impairment of financial
keuangan dijelaskan dalam Catatan 3h; assets is discussed in Note 3h; while impairment
penurunan nilai untuk goodwill dijelaskan dalam for goodwill is discussed in Note 3d.
Catatan 3d.
u. Aset Keuangan dari Perjanjian Jasa Konsesi u. Financial Asset from Service Concession
Arrangment
WSE menerapkan ISAK 16 “Perjanjian Konsesi WSE applies ISAK 16 “Service Concession
Jasa” atas Perjanjian Jual Beli Listrik (PPA) Arrangements” on its Power Purchase
dengan PT Perusahaan Listrik Negara (Persero) Agreement (PPA) with PT Perusahaan Listrik
(PLN). Negara (Persero) (PLN).
Perjanjian konsesi jasa adalah perjanjian dimana Service concession arrangements are
pemerintah atau badan lainnya (pemberi arrangements whereby a government or another
konsesi) memberikan kontrak untuk penyediaan body (the “grantor”) grants contracts for
layanan publik ke entitas sektor swasta the supply of public services to a private sector
(“operator”). Perjanjian tersebut sering disebut entity (the “operator”). This is often referred to as
sebagai perjanjian 'publik-ke-swasta'. a 'public-to-private' arrangement.
Dalam perjanjian ini, operator membangun In this type of arrangement, an operator
infrastruktur yang akan digunakan untuk constructs the infrastructure that will be used to
menyediakan jasa publik dan mengoperasikan provide the public service and operates and
serta mengelola infrastruktur tersebut untuk maintains that infrastructure for a specified
jangka waktu tertentu. Operator dibayar untuk period of time. The operator is paid
jasa yang dibayarkan selama periode perjanjian. for the services over the period of
Perjanjian diatur oleh suatu kontrak yang the arrangement. A contract sets out
menetapkan standar kinerja, mekanisme performance standards, pricing mechanisms,
penyesuaian harga, dan pengaturan untuk and arrangements for arbitrating disputes. In
menengahi perselisihan. Dalam beberapa kasus, some cases, the operator may upgrade
operator dapat meningkatkan infrastruktur yang the existing infrastructure.
ada.
Beberapa ciri umum dari perjanjian konsesi jasa Some common features of service concession
meliputi: arrangements include:
• Pemberi konsesi merupakan entitas sektor • The grantor is a public sector entity, including
publik, termasuk badan pemerintah, atau a governmental body, or a private sector
entitas sektor swasta yang telah diberikan entity to which the responsibility for
tanggung jawab atas layanan tersebut. the service has been devolved.
- 51 -
Page 49
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
• Operator bertanggung jawab setidaknya • The operator is responsible for at least some
atas sebagian pengelolaan infrastruktur dan of the management of the infrastructure and
jasa terkait dan tidak hanya bertindak related services and does not merely act as
sebagai agen atas kepentingan pemberi an agent on behalf of the grantor.
konsesi.
• Kontrak menetapkan harga awal yang akan • The contract sets the initial prices to be
dikenakan oleh operator dan mengatur levied by the operator and regulates price
perubahan harga selama periode perjanjian revisions over the period of the service
jasa. arrangement.
• Operator diwajibkan untuk menyerahkan • The operator is obligated to hand over
infrastruktur kepada pemberi konsesi pada the infrastructure to the grantor in a specified
akhir periode perjanjian dalam kondisi yang condition at the end of the period of the
telah ditentukan, dengan sedikit atau tanpa arrangement, for little or no incremental
imbalan tambahan, terlepas dari pihak yang consideration irrespective of which party
awalnya mendanai infrastruktur. initially financed it.
Perjanjian Jual Beli Listrik (PPA) yang The Power Purchase Agreement (PPA)
diungkapkan pada Catatan 61 antara PLN dan disclosed in Note 61 between PLN and WSE
WSE memenuhi definisi sebagai perjanjian meets the definition of a service concession
konsesi jasa dimana PLN bertindak sebagai arrangement, where PLN acts as a grantor and
pemberi konsesi dan WSE bertindak sebagai WSE acts as the operator. WSE agrees to
operator. WSE setuju untuk merancang, design, finance, construct, own and operate a
membiayai, membangun, memiliki dan mini hydro power generating facility
mengoperasikan fasilitas pembangkit listrik (the “infrastructure”) and sell to PLN the power
tenaga mini hidro (“infrastruktur”) dan menjual generated therefrom on terms and conditions as
kepada PLN energi yang dihasilkan darinya agreed in the PPA. The infrastructure is used for
dengan syarat dan kondisi sebagaimana its entire useful life for the purpose of
disepakati dalam PPA. Infrastruktur digunakan the service concession arrangement.
untuk seluruh masa manfaatnya untuk tujuan
pengaturan layanan konsesi.
Dalam ISAK 16 mengatur prinsip umum dalam Under ISAK 16 determines the general principles
pengakuan hak dan kewajiban terkait dengan in the recognition and measurement of liabilities
konsesi jasa, WSE tidak mengakui infrastruktur and rights related to service concession, WSE
sebagai aset tetap namun mengakui sebagai does not recognize the infrastructure as property
aset keuangan, karena WSE memiliki hak tanpa and equipment but recognizes it as a financial
syarat untuk menerima kas dari PLN melalui asset, as WSE has an unconditional right to
pembayaran kapasitas berdasarkan PPA. Aset receive cash from PLN through the capacity
keuangan dicatat sebagai “pinjaman yang payments under the PPA. The financial asset is
diberikan dan piutang” sesuai dengan PSAK 71, accounted as a “loans and receivables” in
“Instrumen Keuangan”. accordance to PSAK 71, “Financial Instruments”.
ISAK 22 memberikan panduan spesifik ISAK 22 provides specific guidance for
mengenai pengungkapan yang diperlukan atas the required disclosures regarding the service
perjanjian konsesi jasa. concession agreement.
WSE menghitung pendapatan yang terkait WSE accounts for revenue relating to operation
dengan jasa operasi sesuai dengan PSAK 72, services in accordance with PSAK 72, “Revenue
“Pendapatan dari Kontrak dengan Pelanggan”. from Contracts with Customer”. WSE accounts
WSE mencatat kewajiban kontraktual untuk for the contractual obligations to maintain or
memelihara atau mengembalikan infrastruktur di restore the infrastructure in the plant operations
lokasi operasi sesuai dengan PSAK 57, Provisi, in accordance to PSAK 57, Provisions,
Kewajiban Kontinjensi dan Aktiva Kontinjensi. Contingent Liabilities and Contingent Assets.
v. Utang Bruto kepada Subkontraktor v. Gross Amount Due to Subcontractors
Utang bruto kepada subkontraktor diakui atas Gross amount due to subcontractors is
dasar akrual yang merupakan utang prestasi recognized on accrual basis which represents
kerja subkontraktor yang belum the uncertified subcontractor’s working progress,
diberitaacarakan, baik dari subkontraktor atau either from subcontractor or materials which are
material yang diakui sebagai prestasi karena recognized as progress as it has not fulfilled the
belum memenuhi syarat pembayaran sesuai certain payment condition as stated in the
kontrak. Utang bruto kepada subkontraktor contract. Gross amount due to subcontractor is
disajikan sebesar selisih antara biaya yang presented as the differences between costs
- 52 -
Page 50
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
terjadi ditambah laba atau dikurangi kerugian occurred added by income or deducted by
yang diakui. realized loss.
w. Pengakuan Pendapatan dan Beban w. Revenue and Expense Recognition
PSAK 72 menentukan pengakuan pendapatan, PSAK 72 determines that the revenue is
yaitu terjadi ketika pengendalian atas barang recognized when control of goods has been
telah dialihkan atau pada saat (atau selama) jasa transferred or when (or during) the rendering of
diberikan (kewajiban pelaksanaan telah services (performance obligation is satisfied).
dipenuhi). Pendapatan usaha konstruksi yang Revenues from the construction business for
telah diterbitkan Berita Acara Prestasi Proyek which the Minutes of Project Achievement have
dan fakturnya diakui sebagai piutang usaha, been issued and invoices are recognized as
sedangkan yang belum diterbitkan fakturnya trade receivables, while those whose invoices
diakui sebagai tagihan bruto pemberi have not been issued are recognized as
kerja.Pendapatan usaha yang belum diterbitkan employer gross invoices. Business income for
faktur nya dan belum ada Berita Acara Prestasi which invoices have not been issued and there is
Proyek di akui sebagai pekerjaan dalam proses no Minutes of Project Achievement are
Penerapan standar ini mempengaruhi recognized as work in progress.
pengakuan pendapatan pada bisnis properti The implementation of this standard affects the
pada WKR (Entitas Anak), yaitu pendapatan recognition of revenue in the WKR’s (Subsidiary)
diakui ketika unit properti diserahkan kepada property business, by which the revenue is
pelanggan, dimana sebelumnya telah diakui recognized when the property unit is handed-
sesuai dengan metode persentase over to the customer, that previously recognized
penyelesaian. based on the percentage of completion method.
Dalam menentukan pengakuan pendapatan, In determining revenue recognition, the Group
Grup melakukan analisa transaksi melalui performs analysis transaction through
pendekatan lima langkah berikut: the following five steps of assessment:
1. Mengidentifikasi kontrak dengan pelanggan, 1. Identify contracts with customers with certain
dengan kriteria sebagai berikut: criteria as follows:
- Kontrak telah disetujui oleh pihak-pihak - The contract has been agreed by
terkait dalam kontrak the parties involved in the contract
- Grup bisa mengidentifikasi hak dari - The Group can identify the rights of
pihak- pihak terkait dan jangka waktu relevant parties and the term of payment
pembayaran dari barang atau jasa yang for the goods or services to be
akan dialihkan transferred
- Kontrak memiliki substansi komersial - The contract has commercial substance
- Besar kemungkinan entitas akan - It is proable that the Group will receive
menerima imbalan atas barang atau benefits for the goods or services
jasa yang dialihkan transferred
2. Mengidentifikasi kewajiban pelaksanaan 2. Identify the performance obligations in
dalam kontrak, untuk menyerahkan barang the contract, to transfer distinctive goods or
atau jasa yang memiliki karakteristik yang services to the customer.
berbeda ke pelanggan.
3. Menentukan harga transaksi, setelah 3. Determine the transaction price, net of sales
dikurangi potongan penjualan dan pajak discounts and value added tax, which an
pertambahan nilai, yang berhak diperoleh entity expects to be entitled in exchange for
suatu entitas sebagai kompensasi atas transferring promised goods or services to
diserahkannya barang atau jasa yang customer.
dijanjikan ke pelanggan.
4. Mengalokasikan harga transaksi kepada 4. Allocate the transaction price to each
setiap kewajiban pelaksanaan dengan performance obligation on the basis of
menggunakan dasar harga jual dari setiap the selling prices of each goods or services
barang atau jasa yang dijanjikan di kontrak. promised in the contract.
5. Mengakui pendapatan ketika kewajiban 5. Recognize revenue when performance
pelaksanaan telah dipenuhi yaitu dengan obligations is satisfied non distinct method or
metode sepanjang waktu atau dengan distinct method.
metode pada suatu waktu tertentu.
Pembayaran harga transaksi berbeda untuk Payment of the transaction price differs for each
setiap kontrak. Aset kontrak diakui apabila contracts. Contract asset is recognises when
kewajiban pelaksanaan yang telah dipenuhi performance obligation satisfied is more than
- 53 -
Page 51
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
melebihi pembayaran yang dilakukan oleh the payments by customer. Contract liability is
pelanggan. Liabilitas kontrak diakui ketika recognized when the payments by customer is
pembayaran yang dilakukan oleh pelanggan more than the performance obligation satisfied.
melebihi kewajiban pelaksanaan yang telah Contract assets are presented under gross
dipenuhi. Aset kontrak disajikan dalam tagihan amounts due from customers, and contract
bruto kepada pengguna jasa, dan liabilitas liabilities are presented under gross amount due
kontrak disajikan dalam utang bruto kepada to subcontractors.
subkontraktor.
Kriteria tertentu juga harus terpenuhi untuk The specific criteria also must be met for each of
setiap aktivitas Grup seperti dijelaskan di bawah: the Group’s activities as described below:
- Pendapatan dari jasa konstruksi diakui - Revenue from construction services are
dengan metode persentase penyelesaian recognized based on the percentage of
berdasarkan kemajuan fisik proyek pada completion method, determined using
tanggal pelaporan. physical progress of the projects at
the reporting date.
- Pendapatan jasa operasi dan pemeliharaan - Revenue relating to operation and
atas perjanjian konsesi jasa diakui pada saat maintenance service under service
pelanggan menerima dan mengonsumsi concession arrangements is recognized
manfaat dari jasa tersebut. when the customer has received and
consumed the benefit from the services.
- Pendapatan dari penjualan real estat diakui - Revenue from the sale of real estate is
pada saat pengendalian atas real estat telah recognized when the control of real estate
dialihkan kepada pelanggan. have been transferred to customers.
- Pendapatan dari penjualan beton pracetak, - Revenue from the sale of precast, readymix
readymix dan baja diakui pada saat and steel is recognized when the control of
pengendalian atas barang telah berpindah goods has been transferred to
kepada pelanggan. the customer.
Beban diakui pada saat terjadinya, dengan Expenses are recognized as incurred on an
menggunakan dasar akrual. accruals basis.
x. Sewa x. Leases
Grup sebagai pihak penyewa mengakui aset hak- Group as lessee recognized right-of-use assets
guna dan liabilitas sewa terkait dengan sewa, and leases liabilities related to leases, except for
kecuali atas sewa jangka pendek atau sewa short-term leases or leases with low value
dengan aset yang bernilai rendah. Liabilitas sewa assets. These lease liabilities were measured at
diukur pada nilai kini dari sisa pembayaran sewa, the present value of the remaining lease
yang didiskontokan dengan menggunakan suku payments, discounted using the incremental
bunga pinjaman inkremental. Dalam menentukan borrowing rate. In determining incremental
suku bunga pinjaman inkremental, Grup borrowing rate, the Group considers
mempertimbangkan faktor-faktor utama berikut: the following main factors; the Goup’s corporate
risiko kredit korporat Grup, jangka waktu credit risk, the lease term, the lease payment
sewa, jangka waktu pembayaran sewa, waktu term, the time at which the lease is entered into,
dimana sewa dimasukkan, dan mata uang dimana and the currency in which the lease payments are
pembayaran sewa ditentukan. denominated.
Grup mencatat sewa yang diklasifikasikan The Company accounts for leases classified
menjadi sebagai berikut: became as follow:
a. Mencatat aset hak guna dan liabilitas sewa a. Recognises right-of-use assets and lease
dalam laporan posisi keuangan, yang diukur liabilities in the statement of financial
pada nilai kini dari pembayaran sewa masa position, initially measured at the present
depan; value of the future lease payments;
b. Mencatat penyusutan aset hak guna dan b. Recognises depreciation of right-of-use
bunga atas liabilitas sewa dalam laporan assets and interest on lease liabilities in profit
laba rugi; or loss;
c. Memisahkan jumlah total pembayaran sewa c. Separates the total amount of cash paid into
ke bagian pokok dan bunga pada laporan a principal portion (presented within
arus kas yang disajikan dalam aktivitas financing activities) and interest (presented
pendanaan. within financing activities) in the consolidated
statement of cash flows.
- 54 -
Page 52
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
y. Biaya Pinjaman y. Borrowing Costs
Biaya pinjaman yang dapat diatribusikan Borrowing costs that are directly attributable to
langsung dengan perolehan, pembangunan atau the acquisition, construction or production of a
pembuatan aset kualifikasian, dikapitalisasi qualifying asset, are capitalized as part of
sebagai bagian biaya perolehan aset tersebut. the cost of asset. Other borrowing costs are
Biaya pinjaman lainnya diakui sebagai beban recognized as an expense when incurred.
pada saat terjadi. Biaya pinjaman dapat Borrowing costs may include interest expense,
mencakup beban bunga, beban keuangan dalam finance charges in respect of finance leases, or
sewa pembiayaan atau selisih kurs yang berasal exchange differences arising from foreign
dari pinjaman dalam mata uang asing sepanjang currency borrowings to the extent that they are
selisih kurs tersebut diperlakukan sebagai regarded as an adjustment to interest costs.
penyesuaian atas biaya bunga.
Kapitalisasi biaya pinjaman dimulai pada saat Capitalization of borrowing costs commences
Grup telah melakukan aktivitas yang diperlukan when the Group undertakes activities necessary
untuk mempersiapkan aset agar dapat to prepare the asset for its intended use or sale
digunakan atau dijual sesuai dengan intensinya and expenditures for the asset and its borrowing
serta pengeluaran untuk aset dan biaya costs has been incurred. Capitalization of
pinjamannya telah terjadi. Kapitalisasi biaya borrowing costs ceases when substantially all
pinjaman dihentikan ketika secara substansial the activities necessary to prepare the qualifying
seluruh aktivitas yang diperlukan untuk assets for its intended use or sale are complete.
mempersiapkan aset kualifikasian agar dapat
digunakan atau dijual sesuai dengan intensinya
telah selesai.
Konstruksi yang termasuk dalam perolehan aset Construction included in acquisition of certain
tertentu adalah proyek-proyek pre-financing assets is the pre-financing projects whose
yang pembangunannya membutuhkan waktu constructions time is required more than one
lebih dari satu tahun. year.
z. Pajak Penghasilan z. Income Taxes
Beban pajak adalah jumlah gabungan pajak kini Tax expense is the aggregate amount included in
dan pajak tangguhan yang diperhitungkan dalam the determination of profit or loss for
menentukan laba rugi pada suatu periode. Pajak the period in respect of the current tax and
kini dan pajak tangguhan diakui dalam laba rugi, deferred tax. Current tax and deferred tax is
kecuali pajak penghasilan yang timbul dari recognized in profit or loss, except for income tax
transaksi atau peristiwa yang diakui dalam arising from transactions or events that are
penghasilan komprehensif lain atau secara recognized in other comprehensive income or
langsung di ekuitas. Dalam hal ini, pajak tersebut directly in equity. In this case, the tax is
masing-masing diakui dalam penghasilan recognized in other comprehensive income or
komprehensif lain atau ekuitas. equity, respectively.
Beban pajak kini ditentukan berdasarkan laba Current tax expense is determined based on
kena pajak dalam periode yang bersangkutan the taxable income for the year computed using
yang dihitung berdasarkan tarif pajak yang prevailing tax rates.
berlaku.
Jumlah pajak kini untuk periode berjalan dan The amount of unpaid current tax for current and
periode sebelumnya yang belum dibayar diakui prior periods is recognized as a liability.
sebagai liabilitas. Jika jumlah pajak yang telah If the amount already paid in respect of current
dibayar untuk periode berjalan dan and prior periods exceeds the amount due for
periode-periode sebelumnya melebihi jumlah those periods, the excess shall be recognized as
pajak yang terutang untuk periode tersebut, an asset. Current tax liabilities (assets) for
maka kelebihannya diakui sebagai aset. the current and prior periods shall be measured
Liabilitas (aset) pajak kini untuk periode berjalan at the amount expected to be paid to (recovered
dan periode sebelumnya diukur sebesar jumlah from) the taxation authorities, using the tax rates
yang diperkirakan akan dibayar kepada (and tax laws) that have been enacted or
(direstitusi dari) otoritas perpajakan, yang substantively enacted by the end of the reporting
dihitung menggunakan tarif pajak (dan undang- period.
undang pajak) yang telah berlaku atau secara
substantif telah berlaku pada akhir periode
pelaporan.
- 55 -
Page 53
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Manfaat terkait dengan rugi pajak yang dapat Tax benefits relating to tax loss that can be
ditarik untuk memulihkan pajak kini dari periode carried forward to recover the current tax of
sebelumnya diakui sebagai aset. Aset pajak previous periods is recognized as an asset.
tangguhan diakui untuk akumulasi rugi pajak Deferred tax asset is recognized for
belum dikompensasi dan kredit pajak belum the carryforward of unused tax losses and
dimanfaatkan sepanjang kemungkinan besar unused tax credit to the extent that it is probable
laba kena pajak masa depan akan tersedia untuk that future taxable profit will be available against
dimanfaatkan dengan rugi pajak belum which the unused tax losses and unused tax
dikompensasi dan kredit pajak belum credits can be utilized.
dimanfaatkan.
Seluruh perbedaan temporer kena pajak diakui A deferred tax liability shall be recognized for all
sebagai liabilitas pajak tangguhan, kecuali taxable temporary differences, except to all
perbedaan temporer kena pajak yang berasal taxable temporary differences arising from:
dari:
a) Pengakuan awal goodwill; atau a) The intial recognition of goodwill; or
b) Pengakuan awal aset atau liabilitas dari b) The initial recognition of an asset or liability
transaksi yang bukan kombinasi bisnis dan in a transaction which is not a business
pada saat transaksi tidak mempengaruhi combination and at the time of the
laba akuntansi atau laba kena pajak (rugi transaction, does not affect neither
pajak). accounting profit nor taxable profit (tax loss).
Aset pajak tangguhan diakui untuk seluruh A deferred tax asset shall be recognized for all
perbedaan temporer dapat dikurangkan deductible temporary differences to the extent
sepanjang kemungkinan besar laba kena pajak that it is probable that taxable profit will be
akan tersedia sehingga perbedaan temporer available against which the deductible temporary
dapat dimanfaatkan untuk mengurangi laba difference can be utilized, unless the deferred tax
dimaksud, kecuali jika aset pajak tangguhan asset arises from the initial recognition of an
timbul dari pengakuan awal aset atau pengakuan asset or liability in a transaction that is not a
awal liabilitas dalam transaksi yang bukan business combination and at the time of the
kombinasi bisnis dan pada saat transaksi tidak transaction does not affect neither the accounting
mempengaruhi laba akuntansi atau laba kena profit nor taxable profit (tax loss).
pajak (rugi pajak).
Aset dan liabilitas pajak tangguhan diukur Deferred tax assets and liabilities are measured
dengan menggunakan tarif pajak yang at the tax rates that are expected to apply when
diharapkan berlaku ketika aset dipulihkan atau the asset is realized or the liability is settled,
liabilitas diselesaikan, berdasarkan tarif pajak based on tax rates (and tax laws) that have been
(dan peraturan pajak) yang telah berlaku atau enacted or substantively enacted by
secara substantif telah berlaku pada akhir the end of the reporting period. The
periode pelaporan. Pengukuran aset dan measurement of deferred tax assets and
liabilitas pajak tangguhan mencerminkan liabilities shall reflect the tax consequences that
konsekuensi pajak yang sesuai dengan cara would follow from the manner in which the Group
Grup memperkirakan, pada akhir periode expects, at the end of the reporting period, to
pelaporan, untuk memulihkan atau recover or settle the carrying amount of its assets
menyelesaikan jumlah tercatat aset dan and liabilities.
liabilitasnya.
Jumlah tercatat aset pajak tangguhan ditelaah The carrying amount of a deferred tax asset is
ulang pada akhir periode pelaporan. Grup reviewed at the end of each reporting period.
mengurangi jumlah tercatat aset pajak The Group shall reduce the carrying amount of a
tangguhan jika kemungkinan besar laba kena deferred tax asset if there is a high probability
pajak tidak lagi tersedia dalam jumlah yang that sufficient taxable profit will no longer be
memadai untuk mengkompensasikan sebagian available to allow the benefit of part or all of that
atau seluruh aset pajak tangguhan tersebut. deferred tax asset to be utilised. Any such
Setiap pengurangan tersebut dilakukan reduction shall be reversed to the extent that it
pembalikan atas aset pajak tangguhan hingga becomes probable that sufficient taxable profit
kemungkinan besar laba kena pajak yang will be available.
tersedia jumlahnya memadai.
Grup melakukan saling hapus aset pajak The Group offsets deferred tax assets and
tangguhan dan liabilitas pajak tangguhan jika deferred tax liabilities if, and only if:
dan hanya jika:
- 56 -
Page 54
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
a) Grup memiliki hak yang dapat dipaksakan a) The Group has a legally enforceable right to
secara hukum untuk melakukan saling offset deferred tax assets against deferred
hapus aset pajak tangguhan terhadap tax liabilities; and
liabilitas pajak tangguhan; dan
b) Aset pajak tangguhan dan liabilitas pajak b) The deferred tax assets and liabilities are
tangguhan terkait dengan pajak penghasilan related to the income taxes levied by
yang dikenakan oleh otoritas perpajakan the same taxation authority on either:
yang sama atas:
i. Entitas kena pajak yang sama; atau i. The same taxable entities; or
ii. Entitas kena pajak yang berbeda yang ii. Different taxable entities that are
bermaksud untuk memulihkan aset dan intended to recover current tax assets
liabilitas pajak kini dengan dasar neto, and liabilities with a net basis, or to
atau merealisasikan aset dan realize the assets and settle
menyelesaikan liabilitas secara the liabilities simultaneously, in each
bersamaan, pada setiap periode masa future period in which significant
depan dimana jumlah signifikan atas amounts of deferred tax assets or
aset atau liabilitas pajak tangguhan liabilities are expected to be settled or
diperkirakan untuk diselesaikan atau recovered.
dipulihkan.
Grup melakukan saling hapus atas aset pajak The Group offsets the current tax assets and
kini dan liabilitas pajak kini jika dan hanya jika: current tax liabilities if, and only if:
a) Memiliki hak yang dapat dipaksakan secara a) Has legally enforceable rights to offset
hukum untuk melakukan saling hapus atas the recognized amounts; and
jumlah yang diakui; dan
b) Bermaksud untuk menyelesaikan dengan b) Intends either to settle on a net basis, or to
dasar neto atau merealisasikan aset dan realize the assets and settle liabilities
menyelesaikan liabilitas secara bersamaan. simultaneously.
aa. Sukuk aa. Sukuk
Sukuk adalah efek syariah berupa sertifikat atau Sukuk are sharia securities represented by a
bukti kepemilikan yang bernilai sama dan certificate or evidence of ownership of equal
mewakili bagian yang tidak tertentu (tidak denomination and representing individual
terpisahkan atau tidak terbagi) atas: (a). aset ownership interest in (not separated or divided):
berwujud tertentu; (b). manfaat atas aset (a). particular intangible assets; (b).existing or
berwujud tertentu baik yang sudah ada maupun future benefits of particular intangible assets;
yang akan ada; (c). jasa yang sudah ada maupun (c).existing or future services; (d).particular
yang akan ada; (d). aset proyek tertentu; atau (e). project assets; or (e).determined investment
kegiatan investasi yang telah ditentukan. activity.
Sukuk mudharabah adalah sukuk yang Sukuk mudharabah is a sukuk using a
menggunakan akad mudharabah. mudharabah’s contract.
Sukuk mudharabah diakui saat Perusahaan Sukuk mudharabah is recognized when
menjadi pihak yang terikat dengan ketentuan the Company becomes a party bound by
penerbitan sukuk mudharabah. Sukuk the provisions of sukuk mudharabah issuance.
mudharabah diakui sebesar nilai nominal. Sukuk mudharabah is recognized at its nominal
amount.
Biaya transaksi diakui secara terpisah dari sukuk A transaction cost is recognized separately from
mudharabah dan disajikan dalam aset sebagai sukuk mudarabah and is presented in assets as
beban tangguhan, bukan sebagai pos lawan dari deferred expense, rather than a contra account
sukuk mudharabah. Biaya transaksi diamortisasi of sukuk mudarabah. Transaction cost is
secara garis lurus selama jangka waktu sukuk amortized on straight- line basis over the terms
mudharabah. of sukuk mudharabah.
bb. Liabilitas imbalan kerja bb. Employee Benefits Liabilities
Imbalan Kerja Jangka Pendek Short-Term Employee Benefits
Imbalan kerja jangka pendek diakui ketika Short-term employee benefits are recognized
pekerja telah memberikan jasanya dalam suatu when an employee has rendered service during
periode akuntansi, sebesar jumlah tidak accounting period, at the undiscounted amount
- 57 -
Page 55
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
terdiskonto dari imbalan kerja jangka pendek of short-term employee benefits expected to be
yang diharapkan akan dibayar sebagai imbalan paid in exchange for that service.
atas jasa tersebut.
Imbalan kerja jangka pendek mencakup antara Short-term employee benefits include such as
lain upah, gaji, bonus dan insentif. wages, salaries, bonus and incentive.
Imbalan Pasca Kerja Post-Employment Benefits
Imbalan pasca kerja seperti pensiun dan uang Post-employment benefits such as retirement,
pisah dan uang penghargaan masa kerja severance and service payments are calculated
dihitung berdasarkan Undang-Undang based on Labor Law No. 13/2003. In 2020
Ketenagakerjaan No. 13/2003. Pada tahun 2020 the Group has adjusted the calculation of post-
Grup telah menyesuaikan perhitungan imbalan employment benefits based on the Job Creation
pasca kerja berdasarkan Undang - Undang Cipta Law no. 11/2020 which is further regulated in
Kerja No. 11/2020 yang diatur lebih lanjut dalam Government Regulation (PP) no. 35 of 2021 and/
Peraturan Pemerintah (PP) No. 35 tahun 2021 or the Collective Labor Agreement (PKB).
dan/ atau Perjanjian Kerja Bersama (PKB).
Grup mengakui jumlah liabilitas imbalan pasti The Group recognizes the amount of the net
neto sebesar nilai kini kewajiban imbalan pasti defined benefit liability at the present value of
pada akhir periode pelaporan dikurangi nilai the defined benefit obligation at the end of
wajar aset program yang dihitung oleh aktuaris the reporting period less fair value of plan assets
independen dengan menggunakan metode which is calculated by independent actuaries
Projected Unit Credit. Nilai kini kewajiban using the Projected Unit Credit method. Present
imbalan pasti ditentukan dengan value of the benefit obligation determined is by
mendiskontokan imbalan tersebut. discounting the benefit.
Grup mencatat tidak hanya kewajiban hukum The Group not only records its legal obligation
berdasarkan persyaratan formal program under the formal terms of a defined benefit
imbalan pasti, tetapi juga kewajiban konstruktif obligation, but also for any constructive obligation
yang timbul dari praktik informal entitas. that arises from the entity’s informal practices.
Biaya jasa kini, biaya jasa lalu dan keuntungan Current service cost, past service cost and gain
atau kerugian atas penyelesaian, serta bunga or loss on settlement, and net interets on the net
neto atas liabilitas (aset) imbalan pasti neto defined benefit liability (asset) are recognized in
diakui dalam laba rugi. profit or loss.
Pengukuran kembali atas liabilitas (aset) imbalan The remeasurement of the net defined benefit
pasti neto yang terdiri dari keuntungan dan liabilities (assets) comprises actuarial gains and
kerugian aktuarial, imbalan hasil atas aset losses, the return on plan assets and any change
program dan setiap perubahan dampak atas aset in effect of the asset are recognized in other
diakui sebagai penghasilan komprehensif lain. comprehensive income.
Pesangon Termination Benefits
Grup mengakui pesangon sebagai liabilitas dan The Group recognizes liability and expense for
beban pada tanggal yang lebih awal di antara: termination benefits at the earlier of
the following dates:
a) Ketika Grup tidak dapat lagi menarik tawaran a) When the Group no longer can withdraw
atas imbalan tersebut; dan the offer of those benefits; and
b) Ketika Grup mengakui biaya untuk b) When the Group recognizes costs for a
restrukturisasi yang berada dalam ruang restructuring within the scope of PSAK No.
lingkup PSAK No. 57 dan melibatkan 57 and involves payment of termination
pembayaran pesangon. benefits.
Grup mengukur pesangon pada saat pengakuan The Group measures termination benefits on
awal, dan mengukur dan mengakui perubahan initial recognition, and measures and recognizes
selanjutnya, sesuai dengan sifat imbalan kerja. subsequent changes, in accordance with
the nature of the employee benefits.
Grup mengikuti program asuransi pensiun yang The Group has a pension insurance program
diselenggarakan oleh PT Asuransi Jiwasraya which is organized by PT Asuransi Jiwasraya
(Persero). Sesuai dengan UU No. 11/2020, Grup (Persero). In accordance with the Law No.
berkewajiban menutupi kekurangan pembayaran 11/2020, the Group is obligated to cover
- 58 -
Page 56
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
pensiun bila program yang ada sekarang belum the shortage of pension payments when
cukup menutupi kewajiban. the pension plans is currently not sufficient to
cover liabilities.
Imbalan Kerja Jangka Panjang Lainnya Other Long-Term Employee Benefits
Imbalan jangka panjang lain seperti cuti Other long-term benefits such as long service
berimbalan jangka panjang dihitung dengan leave is calculated using the projected unit credit
metode projected unit credit dan didiskontokan method and discounted to present value.
ke nilai kini.
cc. Investasi pada Entitas Asosiasi dan Ventura cc. Investment in Associates and Joint Ventures
Bersama
Entitas Asosiasi Associates
Investasi Grup pada entitas asosiasi diukur The Group's investment in associates is
dengan menggunakan metode ekuitas. Entitas measured using the equity method.
asosiasi adalah suatu entitas dimana Grup An associate is an entity in which
mempunyai pengaruh signifikan atau the Group has significant influence or share
kepemilikan saham lebih dari 20% hak suara. ownership of more than 20% of the voting rights.
Pengakuan awal investasi pada entitas asosiasi The initial recognition of investments in
diakui sebesar biaya perolehan dan jumlah associates is recognized at cost and the carrying
tercatat tersebut ditambah atau dikurangkan amount is increased or decreased to recognize
untuk mengakui bagian Perusahaan atas laba the Group's share in the associates' profit or
rugi entitas asosiasi setelah tanggal perolehan. loss after the acquisition date. The Company's
Bagian Grup atas laba rugi entitas asosiasi diakui share in the profit or loss of associates is
dalam laba rugi Grup. Penerimaan distribusi dari recognized in the Group's profit or loss. Receipt
entitas asosiasi mengurangi nilai tercatat of distributions from associates reduces the
investasi. carrying amount of the investment.
Laporan laba rugi dan penghasilan komprehensif The consolidated statements of profit or loss and
lain konsolidasian mencerminkan bagian atas other comprehensive income reflect the share
hasil operasi entitas asosiasi. Bila terdapat of the results of operations of the associates. If
perubahan yang diakui langsung pada ekuitas there is a change that is recognized directly in
entitas asosiasi, Grup mengakui bagiannya atas the equity of the associate, the Group recognizes
perubahan tersebut dan mengungkapkan hal ini, its share of the change and discloses this, if as a
jika sebagai hasil transaksi-transaksi antara result of transactions between the Group and
Grup dan entitas asosiasi dielimininasi pada the associate are eliminated at amount in
jumlah sesuai dengan kepentingan Grup dalan accordance with the Group's interest in
entitas asosiasi. the associate.
Setelah menerapkan metode ekuitas, Grup After applying the equity method,
menentukan apakah diperlukan untuk mengakui the Group determines whether it is necessary to
tambahan laba rugi penurunan nilai atas recognize additional impairment gain or loss on
investasi Grup dalam entitas asosiasi. Grup the Group's investment in associates.
menentukan pada setiap tanggal pelaporan The Group determines at each reporting date
apakah terdapat bukti yang objektif yang whether there is objective evidence that indicates
mengindikasikan bahwa investasi dalam entitas that the investment in the associate is impaired.
asosiasi mengalami penurunan nilai. Dalam hal If this is the case, the Group calculates the
ini, Perusahaan menghitung jumlah penurunan amount of impairment based on
berdasarkan selisih jumlah terpulihkan atas the difference between the recoverable amount
investasi dalam entitas asosiasi dan nilai of the investment in associated companies and
tercatatnya dan mengakuinya dalam laporan its carrying value and recognizes the amount in
laba rugi dan penghasilan komprehensif lain the consolidated statement of profit or loss and
konsolidasian. other comprehensive income.
Grup menghentikan penggunaan metode ekuitas The Group discontinues the use of the equity
sejak tanggal ketika investasinya berhenti method from the date when its investment
menjadi investasi pada entitas asosiasi sebagai ceases to be an associate as follows:
berikut:
a) Jika investasi menjadi entitas anak, dan a) If the investment becomes a subsidiary, and
- 59 -
Page 57
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
b) Jika sisa kepentingan dalam entitas asosiasi b) If the retained interest in the former associate
merupakan aset keuangan, maka Grup is a financial asset, the Group measures the
mengukur sisa kepentingan tersebut pada retained interest at fair value.
nilai wajar.
Ketika Grup menghentikan penggunaan metode When the Group discontinues the use of
ekuitas, Grup mencatat seluruh jumlah yang the equity method, the Group accounts for all
sebelumnya telah diakui dalam penghasilan amounts previously recognized in other
komprehensif lain yang terkait dengan investasi comprehensive income in relation to that
tersebut menggunakan dasar perlakuan yang investment on the same basis as would have
sama dengan yang disyaratkan jika investee been required if the investee had directly
telah melepaskan secara langsung aset dan disposed of the related assets or liabilities.
liabilitas terkait.
Pengaturan Bersama Joint Arrangement
Pengaturan bersama adalah pengaturan atas Joint arrangement is an arrangement is which
dua atau lebih pihak yang memiliki pengendalian two or more parties have joint control, i.e.
bersama, yaitu persetujuan kontraktual untuk the contractually agreed sharing of control of an
berbagi pengendalian atas suatu pengaturan, arrangement, which exists only when decisions
yang hanya ada ketika keputusan mengenai about the relevant activities require
aktivitas relevan mensyaratkan persetujuan the unanimous consent of the parties sharing
dengan suara bulat dari seluruh pihak yang control.
berbagi pengendalian.
Grup mengklasifikasikan pengaturan bersama The Group classifies joint arrangement as:
sebagai:
1) Operasi Bersama 1) Joint Operation
Merupakan pengaturan bersama yang Represents joint arrangement whereby
mengatur bahwa para pihak yang memiliki the parties that have joint control of
pengendalian bersama atas pengaturan the arrangement have rights to
memiliki hak atas aset dan kewajiban the assets, and obligations for
terhadap liabilitas, terkait dengan the liabilities, relating to the arrangement.
pengaturan tersebut. Para pihak tersebut Those parties are called joint operator.
disebut operator bersama.
Operator bersama mengakui hal berikut A joint operator recognizes in relation to its
terkait dengan kepentingannya dalam interest in a joint operation:
operasi bersama:
a) Aset, mencakup bagiannya atas setiap a) Assets, including its share of any assets
aset yang dimiliki bersama; held jointly;
b) Liabilitas, mencakup bagiannya atas b) Liabilities, including its share of any
liabilitas yang terjadi bersama; liabilities incurred jointly;
c) Pendapatan dari penjualan bagiannya c) Revenue from the sale of its share of
atas output yang dihasilkan dari operasi the output arising from the joint
bersama; operation;
d) Bagian atas pendapatan dari penjualan d) Share of the revenue from the sale of
output oleh operasi bersama; dan the output by the joint operation; and
e) Beban, mencakup bagiannya atas e) Expenses, including its share of any
setiap beban yang terjadi secara expenses incurred jointly.
bersama-sama.
2) Ventura Bersama 2) Joint Venture
Grup mengklasifikasikan pengaturan The Group classifies joint arrangement as a
bersama sebagai ventura bersama yang joint venture whereby the parties that
mengatur bahwa para pihak yang memiliki have joint control of the arrangement have
pengendalian bersama atas pengaturan rights to the net assets of the arrangement.
memiliki hak atas aset neto pengaturan Those parties are called joint venturers.
tersebut. Para pihak tersebut disebut
sebagai venturer bersama.
- 60 -
Page 58
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Venturer bersama mengakui A joint venturer recognizes its interest in a
kepentingannya dalam ventura bersama joint venture as an investment and account
sebagai investasi dan mencatat investasi for that investment using the equity
tersebut dengan menggunakan metode method.
ekuitas.
Bagian Grup atas laba atau rugi entitas The Group’s share of post-acquisition profits
asosiasi pasca akuisisi diakui dalam laporan or losses is recognized in the profit or loss
laba rugi dan bagian atas mutasi and its share of post-acquisition movements
penghasilan komprehensif lain-lain pasca in other comprehensive income is
akuisisi diakui di dalam penghasilan recognized in other comprehensive income
komprehensif lain dan diikuti dengan with a corresponding adjustment to
penyesuaian pada jumlah tercatat investasi. the carrying amount of the investment.
Dividen yang akan diterima dari entitas Dividends receivable from joint ventures are
asosiasi diakui sebagai pengurang jumlah recognized as a reduction in the carrying
tercatat investasi. Jika bagian Grup atas amount of the investment. When the Group’s
kerugian entitas asosiasi sama dengan atau share of losses in a joint ventures equal or
melebihi kepentingannya pada entitas exceeds its interest in the associate,
asosiasi, termasuk piutang tanpa agunan, including any other unsecured receivables,
Grup menghentikan pengakuan bagian the Group does not recognize further losses,
kerugiannya, kecuali Grup memiliki unless it has incurred legal or constructive
kewajiban atau melakukan pembayaran atas obligations or made payments on behalf of
nama entitas asosiasi. the associates.
Kerugian yang melebihi nilai tercatat Loss exceeding the carrying value of
investasi tidak diakui, kecuali bila Grup the investment is not recognized, unless
mempunyai komitmen untuk memberikan the Group has committed to provide financial
bantuan keuangan atau menjamin kewajiban support or guarantee the associates’
entitas asosiasi. obligation.
Laba dan rugi yang dihasilkan dari transaksi Profits and losses resulting from upstream
hulu dan hilir antara Grup dengan entitas and downstream transactions between
asosiasi diakui dalam laporan keuangan the Group and its joint ventures are
konsolidasian Grup hanya sebesar bagian recognized in the Group’s consolidated
investor lain dalam entitas asosiasi. financial statements only to the extent of
the unrelated investor’s interests in the joint
ventures.
Dalam akuntansi metode ekuitas, Under the equity method of accounting,
kepentingan dalam ventura bersama diakui interests in joint ventures are initially
pada biaya perolehan dan disesuaikan recognized at cost and adjusted thereafter to
selanjutnya untuk mengakui bagian Grup recognize the Group’s share of profits or
atas laba rugi dan penghasilan komperhensif losses and other comprehensive income
lain pasca perolehan. Ketika bagian grup post acquisition. When the Group’s share of
atas rugi dalam ventura bersama sama losses in a joint venture equals or exceeds
dengan atau melebihi kepentingannya its interests in the joint ventures (which
dalam ventura bersama (dimana termasuk includes any long-term interests that, in
kepentingan jangka panjang, dalam substance, form part of the Group’s net
substansinya membentuk bagian dari investment in the joint ventures), the Group
investasi bersih Grup dalam ventura does not recognize further losses, unless it
bersama), Grup tidak mengakui kerugian has incurred obligations or made payments
selanjutnya, kecuali telah menjadi kewajiban on behalf of the joint ventures.
atau telah melakukan pembayaran atas
nama ventura bersama.
Keuntungan yang belum terealisasi atas Unrealized gains on transactions between
transaksi antara Grup dan ventura bersama the Group and its joint ventures are
dieliminasi sebesar kepentingan Grup dalam eliminated to the extent of the group’s
ventura bersama. Kerugian yang belum interest in the joint ventures. Unrealized
terealisasi juga dieliminasi kecuali transaksi losses are also eliminated unless
tersebut memberikan bukti adanya the transaction provides evidence of an
penurunan nilai aset yang dialihkan. impairment of the asset transferred.
Kebijakan akuntansi ventura bersama telah Accounting policies of the joint ventures
diubah jika diperlukan untuk memastikan have been changed where necessary to
- 61 -
Page 59
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
konsistensi dari kebijakan yang diterapkan ensure consistency with the policies adopted
oleh Grup. by the Group.
dd. Obligasi Wajib Konversi dd. Mandatory Convertible Bond
Sesuai PSAK 50 Instrumen Keuangan pada In accordance with PSAK 50 Financial
paragraf 11 disebutkan ketika penerbit Instruments in paragraph 11, when the issuer
menerapkan definisi untuk menentukan apakah applies the definition to determine whether a
instrumen keuangan merupakan instrumen financial instrument is an equity instrument, and
ekuitas, dan bukan merupakan liabiltas not a financial liability, the instrument is an equity
keuangan, maka instrumen tersebut merupakan instrument if and only if both conditions are met:
instrumen ekuitas jika dan hanya jika kedua
kondisi terpenuhi:
a. Instrumen tersebut tidak memiliki kewajiban a. The instrument has no contractual
kontraktual: obligation:
• Untuk menyerahkan kas atau aset • To deliver cash or other financial assets
keuangan lain kepada entitas lain; atau to another entity; or
• Untuk mempertukarkan aset keuangan • To exchange financial assets or financial
atau liabilitas keuangan dengan entitas liabilities with other entities on favorable
lain dengan kondisi baik yang terms that are potentially unfavorable to
berpotensi tidak menguntungkan the issuer.
penerbit.
b. Jika instrumen tersebut akan atau mungkin b. If the instrument will or may be settled in
diselesaikan dengan instrumen ekuitas yang the entity's own equity instruments,
diterbitkan entitas, instrumen tersebut the instrument is:
merupakan:
• Nonderivatif yang tidak dimiliki • Non-derivatives that do not have a
kewajiban kontraktual bagi penerbitnya contractual obligation for the issuer to
untuk menyerahkan suatu jumlah yang deliver a variable number of
bervariasi dari instrumen ekuitas yang the entity's own equity instruments; or
diterbitkan entitas; atau
• Derivatif yang akan diselesaikan hanya • A derivative that will be settled only by
dengan mempertukarkan sejumlah exchanging a specified amount of cash
tertentu kas atau aset keuangan lain or another financial asset for a specified
dengan sejumlah tertentu instrumen number of equity instruments issued by
ekuitas yang diterbitkan entitas. the entity.
ee. Investasi Jangka Panjang Lainnya ee. Other Long-Term Investment
Merupakan investasi saham dengan kepemilikan Represent a shares investment with an
kurang dari 20% atau tidak memiliki pengaruh ownership less than 20% or does not have
signifikan yang pada awalnya diakui sebesar nilai significant influence that are recognized initially
wajar sesuai dengan PSAK 71. Bukti terbaik dari at fair value according to PSAK 71. The best
nilai wajar adalah harga kuotasi di pasar aktif. evidence of fair value is the current market price
quotations.
ff. Laba per Saham ff. Earnings per Share
Laba per saham dasar dihitung dengan membagi Basic earnings per share is computed by dividing
laba bersih diatribusikan kepada pemegang net income attributable to the owner of
saham biasa entitas induk dengan jumlah rata- the common shareholders parent entity by
rata tertimbang saham yang beredar dalam satu the weighted average number of shares
periode. outstanding during the period.
Jika jumlah saham biasa atau instrumen If the number of ordinary shares or potential
keuangan berpotensi saham biasa yang beredar financial instruments to be ordinary shares
meningkat sebagai akibat dari kapitalisasi, outstanding increases as a result of
penerbitan saham bonus atau pemecahan capitalisation, bonus issue or share split, or
saham, atau menurun sebagai akibat dari decreases as a result of a reverse share split,
penggabungan saham, perhitungan laba per the calculation of basic and diluted earnings per
saham dasar dan dilusian untuk seluruh periode share for all periods presented shall be adjusted
yang disajikan harus disesuaikan secara retrospectively.
retrospektif.
- 62 -
Page 60
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Jumlah rata-rata tertimbang saham beredar The number of weighted average shares
untuk perhitungan laba per saham dasar adalah outstanding for the calculation of basic earnings
sebesar 28.806.807.016 lembar pada tanggal 31 per share amounting to 28,806,807,016 as of
Maret 2024 dan 31 Desember 2023 (Catatan 51). March 31, 2024 and December 31, 2023,
respectively (Note 51).
gg. Biaya Emisi Obligasi Saham gg. Bonds and Shares Issuance Costs
Biaya emisi obligasi merupakan biaya transaksi Bond issuance costs are transaction costs to be
yang harus dikurangkan langsung dari hasil deducted from the proceeds in order to determine
emisi dalam rangka menentukan hasil emisi the net proceeds of bonds. The difference
bersih obligasi. Selisih antara hasil emisi bersih between the net proceeds and the nominal value
dengan nilai nominal merupakan diskonto atau is a discount or premium and will be amortized
premium dan diamortisasi selama jangka waktu over the term of the bonds.
obligasi yang bersangkutan.
Biaya emisi saham disajikan sebagai bagian Share issuance costs are presented as a
tambahan modal disetor dan tidak diamortisasi. deduction from the additional paid-in capital and
Biaya emisi saham disajikan sebagai pengurang not amortized.
dari tambahan modal disetor dan tidak
diamortisasi.
hh. Segmen Operasi hh. Operating Segment
Grup menyajikan segmen operasi berdasarkan The Group presented operating segments based
informasi keuangan yang digunakan oleh on the financial information used by
pengambil keputusan operasional dalam menilai the chief operating decision maker in assessing
kinerja segmen dan menentukan alokasi sumber the performance of segments and in
daya yang dimilikinya. Segmen didasarkan pada the allocation of resources. The segments are
aktivitas dari setiap kegiatan operasi entitas legal based on the activities of each operating legal
di dalam Grup. entities within the Group.
Segmen operasi adalah suatu komponen dari An operating segment is a component of
entitas: the entity:
• Yang terlibat dalam aktivitas bisnis yang • That engages in business activities from
memperoleh pendapatan dan menimbulkan which it may earn revenues and incur
beban (termasuk pendapatan dan beban expenses (including revenues and expenses
yang terkait dengan transaksi dengan relating to the transactions with other
komponen lain dari entitas yang sama); components of the same entity);
• Yang hasil operasinya dikaji ulang secara • Whose operating results are regularly
regular oleh pengambil keputusan reviewed by chief operating decision maker
operasional untuk membuat keputusan to make decisions about resources to be
tentang sumber daya yang dialokasikan allocated to the segment and assesses its
pada segmen tersebut dan menilai performance; and
kinerjanya; dan
• Yang informasi keuangan yang terpisah • For which separate financial information is
miliknya tersedia. available.
ii. Sumber Ketidakpastian Estimasi dan ii. Source of Estimation Uncertainy and Critical
Pertimbangan Akuntansi Penting Accounting Judgements
Dalam penerapan kebijakan akuntansi Grup In the application of the Group’s accounting
diatas, Direksi diwajibkan untuk membuat policies above, the Directors are required to
penilaian, estimasi dan asumsi tentang jumlah make judgments, estimates and assumptions
tercatat aset dan liabilitas yang tidak tersedia dari about the carrying amounts of assets and
sumber lain. Estimasi dan asumsi yang terkait liabilities that are not readily apparent from other
didasarkan pada pengalaman historis dan faktor- sources. The estimates and associated
faktor lain yang dianggap relevan. Hasil assumptions are based on historical experience
aktualnya mungkin berbeda dari estimasi and other factors that are considered to be
tersebut. relevant. Actual results may differ from these
estimates.
Estimasi dan asumsi yang mendasari ditelaah The estimates and underlying assumptions are
secara berkelanjutan. Revisi estimasi akuntansi reviewed on an ongoing basis. Revisions to
- 63 -
Page 61
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
diakui dalam periode yang perkiraan tersebut accounting estimates are recognized in
direvisi jika revisi hanya mempengaruhi periode the period which the estimate is revised if
itu, atau pada periode revisi dan periode masa the revision affects only that period, or in
depan jika revisi mempengaruhi kedua periode the period of the revision and future periods if
saat ini dan masa depan. the revision affects both current and future
periods.
4. PERTIMBANGAN KRITIS AKUNTANSI DAN 4. CRITICAL ACCOUNTING JUDGMENTS AND KEY
SUMBER UTAMA KETIDAKPASTIAN ESTIMASI SOURCES OF ESTIMATION UNCERTAINTY
Pertimbangan Kritis dalam Penerapan Kebijakan Critical Judgments in Applying Accounting
Akuntansi Policies
Dalam penerapan kebijakan akuntansi Grup, yang In the application of the Group accounting policies,
dijelaskan dalam Catatan 3, direksi diwajibkan untuk which are described in Note 3, the directors are
membuat pertimbangan, estimasi dan asumsi required to make judgments, estimates and
tentang jumlah tercatat aset dan liabilitas yang tidak assumptions about the carrying amounts of assets
tersedia dari sumber lain. Estimasi dan asumsi yang and liabilities that are not readily apparent from other
terkait didasarkan pada pengalaman historis dan sources. The estimates and associated assumptions
faktor-faktor lain yang dianggap relevan. Hasil are based on historical experience and other factors
aktualnya mungkin berbeda dari estimasi tersebut. that are considered to be relevant. Actual results may
differ from these estimates.
Estimasi dan asumsi yang mendasari ditelaah secara The estimates and underlying assumptions are
berkelanjutan. Revisi estimasi akuntansi diakui dalam reviewed on an ongoing basis. Revisions to
periode dimana estimasi tersebut direvisi jika revisi accounting estimates are recognized in the period
hanya mempengaruhi periode tersebut, atau pada which the estimate is revised if the revision affects
periode revisi dan periode masa depan jika revisi only that period, or in the period of the revision and
mempengaruhi periode saat ini dan masa depan. future periods if the revision affects both current and
future periods.
Penenerapan Suatu Pengaturan The adoption of an arrangement
Penerapan suatu pengaturan adalah tidak praktis The adoption of an arrangement is not practical when
ketika entitas tidak dapat menerapkannya setelah the entity cannot apply it after the whole rational
seluruh usaha yang rasional dilakukan. Untuk suatu business done. For a period previously specified, it is
periode sebelumnya tertentu, tidak praktis untuk not practical to apply a change in accounting policy
menerapkan suatu perubahan kebijakan akuntansi retrospectively or serves or restatement of
secara retrospektif atau menyajikan atau penyajian the retrospective to correct an error if:
kembali retrospektif untuk mengoreksi kesalahan
jika:
- Dampak penerapan retrospektif atau penyajian - The impact of application of retrospective or
kembali retrospektif tidak dapat ditentukan; restatement of the retrospective can not be done;
- Penerapan retrospektif atau penyajian kembali - The application of retrospective or restatement of
retrospektif memerlukan asumsi mengenai the retrospective requires an assumption about
maksud manajemen yang ada pada periode the intent of management that exist in the
sebelumnya tersebut; atau previous period; or
- Penerapan retrospektif atau penyajian kembali - The application of retrospective or restatement of
retrospektif memerlukan estimasi signifikan atas the retrospective requires significant estimates
jumlah dan tidak mungkin untuk membedakan on the amount and it is impossible to distinguish
secara obyektif informasi mengenai estimasi objectively information about the estimation:
yang:
1. Menyediakan bukti atas keadaan yang ada 1. Provides evidence of circumstances that
pada tanggal disaat jumlah tersebut diakui, existed on the date when such amounts
diukur atau diungkapkan; dan recognized, measured or disclosed; and
2. Tersedia ketika laporan keuangan periode 2. Available when the financial statement of
sebelumnya diselesaikan dengan informasi the previous period is resolved with other
lain. information.
Perjanjian Konsesi Jasa Service Concession Arrangement
ISAK 16 menjelaskan pendekatan untuk ISAK 16 outlines an approach to account for service
membukukan perjanjian konsesi jasa akibat dari concession arrangement arising from entities
- 64 -
Page 62
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
penyediaan jasa kepada publik. ISAK 16 mengatur providing public services. It provides that
bahwa operator (pihak penerima konsesi jasa) tidak the operator (concession right beneficiary) should not
membukukan infrastruktur sebagai aset tetap, namun account for the infrastructure as property and
diakui sebagai aset keuangan dan/atau aset tak equipment, but should be recognized as a financial
berwujud. Badan Pengatur Jalan Tol (BPJT) asset and/or an intangible asset. Indonesia Toll Road
memberikan hak, kewajiban dan keistimewaan Authority (BPJT) granted the Group the rights,
kepada Grup termasuk kewenangan dalam obligations and privileges including the authority to
pendanaan, desain, konstruksi, operasi dan finance, design, construct, operate and maintain
pemeliharaan jalan tol. Pada akhir masa konsesi the toll roads. Upon expiry of the service
jasa, Grup harus menyerahkan jalan tol kepada BPJT concession period, the Group shall handover the toll
tanpa biaya, dalam keadaan beroperasional dan roads to the BPJT without cost, fully operational and
kondisi yang baik, termasuk setiap dan semua tanah in good working condition, including any and all
yang diperlukan, pekerjaan, fasilitas jalan dan existing land, works, toll road facilities and equipment
peralatan tol yang secara langsung berkaitan dan found therein directly related to, and in connection
berhubungan dengan pengoperasian fasilitas jalan with, the operation of the toll road facilities. The Group
tol. Grup berpendapat bahwa Perjanjian has made judgment that the Toll Road Concession
Pengusahaan Jalan Tol (PPJT) memenuhi kriteria Agreement (PPJT) qualifies under the intangible
sebagai model aset tak berwujud, di mana aset asset model, wherein the concession asset is
konsesi diakui sebagai aset tak berwujud sesuai recognized as an intangible asset in accordance with
dengan PSAK 19, “Aset Tak Berwujud”. PSAK 19, “Intangible Assets”.
WTR (entitas anak) yang memiliki hak pengusahaan WTR (subsidiary) who has the toll road concession is
jalan tol diharuskan oleh ISAK 16 untuk menyajikan required by ISAK 16 to present an income line
unsur pendapatan yang merefleksikan pendapatan reflecting the income from construction or
dari jasa konstruksi atas aset konsesi atau improvements to concession assets made during
peningkatan kemampuan aset konsesi yang the period in the consolidated statement of profit or
dilakukan selama periode berjalan pada laporan laba loss and other comprehensive income. WTR
rugi dan penghasilan komprehensif lain recognizes construction revenues of concession
konsolidasian. WTR mengakui pendapatan asset and construction costs in accordance with
konstruksi aset konsesi dan biaya konstruksi sesuai PSAK 72. Subsidiary, WTR measures construction
dengan PSAK 72. Entitas anak, WTR mengukur revenues at cost with zero margin based on
pendapatan konstruksi atas aset konsesi dengan management estimation calculated by a certain
menggunakan metode biaya dengan marjin nol model, in determining the initial toll road tariff before
berdasarkan estimasi terbaik manajemen yang the toll road is operated.
dihitung dengan model tertentu pada saat penentuan
tarif awal jalan tol sebelum jalan tol dioperasikan.
Sumber Ketidakpastian Estimasi Key Sources of Estimation Uncertainy
Restrukturisasi Restructuring
Provisi restrukturisasi diakui ketika Grup telah A restructuring provision is recognized when
menciptakan perkiraan yang valid kepada pihak- the Group has developed a detailed formal plan for
pihak yang terkena dampak restrukturisasi bahwa the restructuring and has raised a valid expectation in
entitas akan melaksanakan restrukturisasi dengan those affected that it will carry out
memulai implementasi rencana tersebut atau the restructuring by starting to implement the plan or
mengumumkan pokok-pokok rencana. Pengukuran announcing its main features to those affected by it.
provisi restrukturisasi hanya mencakup pengeluaran The measurement of a restructuring provision
langsung yang timbul dari restrukturisasi, di mana includes only the direct expenditures arising from
jumlah tersebut benar-benar harus dikeluarkan the restructuring, which are those amounts that are
dalam rangka restrukturisasi; dan tidak terkait both necessarily entailed by the restructuring and not
dengan aktivitas entitas yang masih berlangsung. associated with the ongoing activities of
the entity.
Rugi Penurunan Nilai Pinjaman yang Diberikan dan Impairment Loss on Loans and Receivables
Piutang
Grup menilai penurunan nilai pinjaman yang The Group assesses its loans and receivables for
diberikan dan piutang pada setiap tanggal pelaporan. impairment at each reporting date. The fair value of
Nilai wajar piutang ditentukan dengan accounts receivable is determined by calculating
memperhitungkan penurunan nilai yang bersifat the permanent impairment and the carrying value is
permanen dan nilai tercatatnya dikurangi untuk reduced to recognize the decline. The assumptions
mengakui penurunan tersebut. Asumsi yang used to determine the allowance for impairment of
digunakan untuk menentukan penyisihan penurunan
- 65 -
Page 63
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
nilai piutang didasarkan penilaian secara individual receivables based on an individual assessment of
atas piutang masing-masing debitur (pemberi kerja). each receivable debtor (employer).
Taksiran Masa Manfaat Ekonomis Aset Tetap Estimated Useful Lives of Property and Equipment
Masa manfaat setiap aset tetap Grup ditentukan The useful life of each item of the Group’s property
berdasarkan kegunaan yang diharapkan dari and equipment are estimated based on the period
penggunaan aset tersebut. Estimasi ini ditentukan over which the asset is expected to be available for
berdasarkan evaluasi teknis internal dan pengalaman use. Such estimation is based on internal technical
atas aset sejenis. Masa manfaat setiap aset direviu evaluation and experience with similar assets.
secara periodik dan disesuaikan apabila prakiraan The estimated useful life of each asset is reviewed
berbeda dengan estimasi sebelumnya karena periodically and updated if expectations differ from
keausan, keusangan teknis dan komersial, hukum previous estimates due to physical wear and tear,
atau keterbatasan lainnya atas pemakaian aset. technical or commercial obsolescence and legal or
Namun terdapat kemungkinan bahwa hasil operasi other limits on the use of the asset. It is possible,
dimasa mendatang dapat dipengaruhi secara however, that future results of operations could be
signifikan oleh perubahan atas jumlah serta periode materially affected by changes in the amounts and
pencatatan biaya yang diakibatkan oleh perubahan timing of recorded expenses brought about by
faktor yang disebutkan di atas. changes in the factors mentioned above.
Perubahan masa manfaat aset tetap dapat A change in the estimated useful life of any item of
mempengaruhi jumlah biaya penyusutan yang diakui property and equipment would affect the recorded
dan penurunan nilai tercatat aset tetap. depreciation expense and decrease in the carrying
values of property and equipment.
Nilai Wajar Properti Investasi Fair Value of Investment Property
Nilai wajar dari properti investasi ditentukan The fair value of investment property is determined by
menggunakan teknik valuasi. Valuasi properti using valuation techniques. The Group’s investment
investasi milik Grup dilakukan oleh penilai properties were valued by independent professionally
independen professional yang memiliki kualifikasi qualified valuers who hold a recognised relevant
yang relevan dan memiliki pengalaman yang professional qualification and have recent experience
berhubungan dengan segmen properti investasi yang in the segment of related investment properties.
akan dinilai untuk semua properti investasi. Nilai The fair value for all investment properties was
wajar untuk semua properti investasi ditentukan determined using relevnt approach to its investment
pendekatan yang relevan dengan masing-masing property.
properti investasi.
Provisi Pelapisan Jalan Tol Provision for Overlay
Biaya pelapisan ini akan dicadangkan secara berkala The provision for overlay is detemined periodically
berdasarkan estimasi seiring dengan penggunaan based on the estimated utilization of toll road by
jalan tol oleh pelanggan. Provisi diukur dengan nilai customers. This provision is measured using
kini atas estimasi manajemen terhadap pengeluaran the present value of the management‘s estimate of
yang diperlukan untuk menyelesaikan liabilitas kini the expenditures required to settle present obligation
pada tanggal pelaporan. at the reporting date.
Liabilitas Imbalan Pasca Kerja Post-Employment Benefits Obligation
Nilai kini liabilitas imbalan pasca kerja tergantung The present value of post-employment benefit
pada beberapa faktor yang ditentukan dengan dasar liabilities depends on several factors which are
aktuarial berdasarkan beberapa asumsi. Asumsi determined by actuarial basis based on several
yang digunakan untuk menentukan biaya assumptions. Assumptions used to determine
(penghasilan) pensiun neto mencakup tingkat pensions cost (benefits) covered discount rate.
diskonto. Perubahan asumsi ini akan mempengaruhi The changes of assumptions might affect carrying
jumlah tercatat imbalan pasca kerja. value of post-employment benefits.
Grup menentukan tingkat diskonto yang sesuai pada The Group determines the appropriate discount rate
akhir pelaporan, dengan mempertimbangkan tingkat at the final reporting, by considering the discount rate
suku bunga obligasi pemerintah yang didenominasi of government’s bond which denominated in benefit’s
dalam mata uang imbalan yang akan dibayar dan currency that will be paid and have a similar term with
memiliki jangka waktu yang serupa dengan jangka the terms of the related liabilities.
waktu liabilitas yang terkait.
- 66 -
Page 64
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pajak Penghasilan Final Final Income Tax
Pajak penghasilan dari aktivitas jasa konstruksi dihitung Income tax from construction is computed based on
berdasarkan Peraturan Pemerintah (PP) No. 40 tahun the Government Regulation (PP) No. 40 year 2009
2009 mengenai perubahan atas PP No. 51 tahun concerning amendments of Government Regulation
2008 tentang pajak penghasilan atas penghasilan dari No. 51 year 2008 concerning income tax from
usaha jasa konstruksi yang berlaku efektif mulai tanggal the construction business that is effective starting
1 Agustus 2008, dimana perlakuan pengenaan pajak August 1, 2008, where the final tax at 3% is applied
final dikenakan atas kontrak sebesar 3% yang diperoleh for contract signed starting August 1, 2008.
mulai tanggal 1 Agustus 2008.
Pada tahun 2022, Pemerintah mengeluarkan In 2022, the Indonesian Government issued
Peraturan Pemerintah Nomor 9 Tahun 2022 tentang Government Regulation No. 9 Year 2022 (“PP No.
Perubahan Kedua atas Peraturan Pemerintah Nomor 9/2022”) concerning Second Amendment of
51 Tahun 2008 tentang Pajak Penghasilan atas Government Regulation No. 51 Year 2008
Penghasilan dari Usaha Jasa Konstruksi. Melalui concerning Income Tax on Income from Construction
peraturan ini, Pemerintah memutuskan beberapa Services Business. Through this regulation, the
kebijakan baru dan salah satunya terkait dengan Government issued some new policies, one of which
penyesuaian tarif pajak penghasilan final menjadi is related to the adjustment of the final income tax rate
sebesar 2,65% yang mulai berlaku pada tanggal 21 to 2.65% which is effective on February 21, 2022
Februari 2022 dan seterusnya. onwards.
Pajak penghasilan final disajikan di luar beban pajak Final income tax is presented outside of the income
penghasilan pada laba rugi. tax expenses in profit or loss.
Perbedaan nilai tercatat aset atau liabilitas yang The difference between the final income tax carrying
berhubungan dengan pajak penghasilan final dengan amounts of existing assets and liabilities, and their
dasar pengenaan pajaknya tidak diakui sebagai aset respective final tax bases are not recognized as
atau liabilitas pajak tangguhan. deferred tax assets or liabilities.
Penurunan Nilai atas Goodwill Impairment of Goodwill
Uji penurunan nilai goodwill wajib dilakukan Impairment testing of goodwill is required to be
sedikitnya setahun sekali tanpa memperhatikan performed at least annually irrespective of whether or
apakah telah terjadi indikasi penurunan nilai. not there are indications of impairment. Determining
Penentuan nilai pakai aset tak berwujud the value in use of intangible assets requires the
membutuhkan estimasi arus kas yang diharapkan estimation of cash flows expected to be generated
akan dihasilkan dari pemakaian berkelanjutan dan from the continued use and ultimate disposition of
pelepasan akhir atas aset tersebut serta tingkat such assets and a suitable discount rate in order to
diskonto yang tepat untuk menghitung nilai kini. calculate the present value.
Manajemen berkeyakinan bahwa asumsi-asumsi While it is believed that the assumptions used in
yang digunakan dalam estimasi nilai pakai dalam the estimation of the value in use of assets reflected
laporan keuangan konsolidasian adalah tepat dan in the consolidated financial statements are
wajar, namun demikian, perubahan signifikan dalam appropriate and reasonable, significant changes in
asumsi-asumsi tersebut dapat berdampak signifikan this assumptions may materially affect
pada jumlah nilai terpulihkan dan jumlah kerugian the assessment of recoverable values and any
penurunan nilai yang terjadi mungkin berdampak resulting impairment loss could have a material
material pada hasil operasi Grup. adverse impact on the results of Group’s operations.
Penilaian Instrumen Keuangan Valuation of Financial Instruments
Seperti dijelaskan dalam Catatan 59, Grup As described in Note 59, the Group uses valuation
menggunakan teknik penilaian yang meliputi input techniques that include inputs that are not based on
yang tidak didasarkan pada data pasar yang dapat observable market data to estimate the fair value of
diobservasi untuk mengestimasi nilai wajar dari certain types of financial instruments.
beberapa jenis instrumen keuangan.
Direksi berpendapat bahwa teknik penilaian yang The directors believe that the chosen valuation
dipilih dan asumsi yang digunakan adalah tepat dalam techniques and assumptions used are appropriate in
menentukan nilai wajar dari instrumen keuangan. determining the fair value of financial instruments.
Arus Kas Masa Depan dari Perjanjian Jasa Konsesi Future Cash Flows from Service Concession Arrangement
WSE menilai aset keuangannya dari proyek konsesi WSE assesses its financial asset from concession
pada setiap tanggal pelaporan. Manajemen membuat project at each reporting date. Management makes
- 67 -
Page 65
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
penilaian mengenai metodologi dan asumsi untuk judgment as to the methodology and assumptions for
memperkirakan jumlah dan waktu arus kas masa estimating the amount and timing of future cash flows
depan dari pembayaran kapasitas. Nilai tercatat aset of capacity payments. The carrying amount of
keuangan dari proyek konsesi diungkapkan pada financial asset from concession project is disclosed in
Catatan 23. Note 23.
5. KAS DAN SETARA KAS 5. CASH AND CASH EQUIVALENTS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Kas/ Cash on Hand 5.046.512.844 3.743.083.997
Bank/ Cash in Banks
Pihak Berelasi/ Related Parties
Rupiah Indonesia/ Indonesian Rupiah
Bank Tabungan Negara Syariah 528.334.820.601 32.357.185.941
PT Bank Negara Indonesia (Persero) Tbk 319.815.919.240 417.372.461.872
PT Bank Mandiri (Persero) Tbk 143.430.875.653 90.911.678.757
PT Bank Rakyat Indonesia (Persero) Tbk 27.940.058.880 42.172.176.894
PT Bank Tabungan Negara (Persero) Tbk 26.684.723.302 40.072.078.346
PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank Syariah Mandiri) 26.271.757.221 1.367.129.456
PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank BNI Syariah) 67.516.968 68.030.342
PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank BRI Syariah Tbk) 13.998.473 14.043.473
PT Bank Raya Indonesia -- 1.025.000
Dolar Amerika Serikat/ United States Dollar
PT Bank Mandiri (Persero) Tbk 1.097.483.353 991.437.791
PT Bank Negara Indonesia (Persero) Tbk 571.949.765 851.679.001
Yen Jepang/ Japanese Yen
PT Bank Negara Indonesia (Persero) Tbk 379.438.709 7.482.065.619
Euro
PT Bank Mandiri (Persero) Tbk 9.460.455 9.446.789
Sub Jumlah/ Sub Total 1.074.618.002.620 633.670.439.281
Pihak Ketiga/ Third Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk 52.992.735.411 82.052.748.130
PT Bank CIMB Niaga Tbk 31.660.430.866 18.744.886.520
PT Bank Central Asia Tbk 12.115.463.075 14.815.786.313
Bank Artha Graha Internasional 2.909.814.856 20.573.923
Kospin Jasa 976.442.329 714.267.116
BPD Sulsel 388.413.946 249.645.946
PT Bank Woori Saudara Indonesia 1906 Tbk 308.898.676 1.962.790
PT Bank UOB Indonesia 87.437.110 72.980.910
PT Bank OCBC NISP Tbk 73.067.486 31.157.470
PT Bank BCA Syariah 53.343.162 53.350.841
PT Bank DKI 51.666.920 81.951.452
PT Bank Jtrust Indonesia Tbk 51.570.458 51.668.739
PT Bank ICBC Indonesia 40.863.804 40.864.575
PT Bank Mestika Dharma Tbk 33.305.138 33.362.839
PT Bank Maybank Indonesia Tbk 31.096.776 27.544.703
Bank BPR Intidana 24.946.960 19.546.907
PT Bank Pembangunan Daerah Bali 21.953.940 21.983.262
PT Bank KB Bukopin Tbk 4.947.977 5.007.977
PT Bank Permata Tbk 4.496.586 4.896.024
PT Bank Mega Tbk 4.309.949 4.429.691
PT Bank CTBC Indonesia 2.439.964 2.614.964
Bank Sumitomo Mitsui Indonesia 647.559 667.181
BPD Kalsel -- 585.000
Riyal Arab Saudi/ Saudi Arabian Riyal
The National Commercial Bank - Jeddah 131.182.201 131.182.201
Ringgit Malaysia/ Malaysian Ringgit
PT Bank Maybank Indonesia Tbk 12.328.016 12.328.016
Sub Jumlah/ Sub Total 101.981.803.165 117.195.993.490
Deposito Berjangka/ Time Deposits
Pihak Berelasi/ Related Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Negara Indonesia (Persero) Tbk 500.125.000.000 6.325.000.000
PT Bank Rakyat Indonesia (Persero) Tbk 356.920.000.000 207.812.215.472
PT Bank Mandiri Taspen 340.000.000.000 60.000.000.000
PT Bank Mandiri (Persero) Tbk 290.732.500.000 5.000.000
PT Bank Tabungan Negara (Persero) Tbk 155.313.380.000 258.313.380.000
- 68 -
Page 66
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
PT Bank Raya Indonesia -- 20.000.000.000
PT Bank Syariah Indonesia Tbk -- 14.000.000.000
Sub Jumlah/ Sub Total 1.643.090.880.000 566.455.595.472
Pihak Ketiga/ Third Parties
Rupiah Indonesia/ Indonesian Rupiah
-- --
Kospin Jasa 19.000.000.000 19.000.000.000
PT Bank Woori Saudara Indonesia 1906 Tbk. 7.000.000.000 --
Sub Jumlah/ Sub Total 26.000.000.000 19.000.000.000
Jumlah/ Total 2.850.737.198.629 1.340.065.112.240
Tingkat Suku Bunga Deposito Berjangka per Tahun (%)/
Interest Rate of Time Deposits per Annum (%) 1,9% - 2,5% 1,9% - 2,5%
Jangka Waktu/ Time Period 1 - 3 Bulan/ Months 1 - 3 Bulan/ Months
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Kas yang Dibatasi Penggunaannya/ Restricted of Cash
Pihak Berelasi/ Related Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank Mandiri (Persero) Tbk 3.716.881.263.728 3.812.739.729.899
PT Bank Negara Indonesia (Persero) Tbk 808.713.097.447 1.625.599.665.223
PT Bank Rakyat Indonesia (Persero) Tbk 559.485.686.483 750.896.288.233
PT Bank Syariah Indonesia Tbk 133.463.969.807 137.446.276.759
Indonesia Eximbank 3.053.266 3.053.266
PT Bank Tabungan Negara (Persero) Tbk -- 59.480.925.000
Dolar Amerika Serikat/ United States Dollar
PT Bank Mandiri (Persero) Tbk 116.980.035.103 244.509.269.894
PT Bank Rakyat Indonesia (Persero) Tbk 54.428.814.691 52.912.842.140
Jumlah/ Total 5.389.955.920.525 6.683.588.050.414
Pihak Ketiga/ Third Parties
Rupiah Indonesia/ Indonesian Rupiah
PT Bank CIMB Niaga Tbk - Unit Usaha/ Business Unit Syariah 10.121.650.748 121.782.800
PT Bank DKI 6.192.222.506 6.185.491.941
PT Bank UOB Indonesia 4.485.349.070 4.477.129.706
PT Bank Maybank Indonesia Tbk 1.315.051.756 1.312.581.980
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk 847.878.508 845.325.205
PT Bank KB Bukopin Tbk 613.734.122 530.185.561
PT Bank Permata Tbk 536.372.011 536.372.011
PT Bank of China 306.246.317 305.544.016
PT Bank Mega Tbk 104.987.835 95.592.831
PT Bank KB Bukopin Syariah 64.362.340 57.229.943
PT Bank OCBC NISP Tbk 51.696.350 51.741.816
PT Bank CIMB Niaga Tbk 44.320.424 44.410.424
PT Bank Pan Indonesia Tbk 15.261.114 15.551.114
PT Bank BTPN Tbk 70.370 70.328
Sub Jumlah/ Sub Total 24.699.203.471 14.579.009.676
Jumlah/ Total 5.414.655.123.996 6.698.167.060.090
Bank yang dibatasi penggunaannya merupakan kas Restricted bank is cash in the Group's bank which
di bank milik Grup yang penggunaan dan penarikan cannot be used or withdrawn for less than 3 months.
dana tidak dapat digunakan dalam waktu kurang dari The group receives the final invoice proceeds into
3 bulan. Grup menerima hasil tagihan termin kedalam the Cash and Account Management Agreement
rekening escrow Cash and Account Management (CAMA) escrow account, where the group cannot use
Agreement (CAMA), dimana grup tidak dapat the funds due to restrictions on their use.
menggunakan dana tersebut dikarenakan terdapat
pembatasan atas penggunaannya.
Berdasarkan Akta Notaris Ashoya Ratam S.H., M.Kn, Based on the Notary Deed of Ashoya Ratam S.H.,
No. 39 tanggal 25 Oktober 2021 perihal perjanjian M.Kn, No. 39 dated October 25, 2021, regarding cash
pengelolaan kas dan rekening penampungan, management agreements and escrow accounts,
dimana didalam perjanjian tersebut pasal 2 ayat 2.2, where in the agreement article 2 paragraph 2.2,
menginformasikan mekanisme penggunaan dan informs the mechanism for using and withdrawing
penarikan dana dari rekening bank yang funds from bank accounts which states the conditions
menyebutkan syarat dan pembatasan didalam and restrictions on the use and withdrawal of funds.
- 69 -
Page 67
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
penggunaan dan penarikan dana. Atas informasi Based on this information, the bank account is not
tersebut, rekening bank tersebut tidak termasuk included in the criteria for a cash and cash equivalent
didalam kriteria akun kas dan setara kas, dimana kas account, where cash and cash equivalents can be
dan setara kas penggunaan dan penarikan dana used and withdrawn for less than 3 months.
dapat digunakan kurang dari 3 bulan. Oleh karena itu Therefore, it is included in the banks whose use is
termasuk kedalam bank yang dibatasi restricted.
penggunaannya.
Saat ini Perusahaan sedang melakukan permohonan Currently the Company is requesting approval for
persetujuan perjanjian Master Restructuring the Master Restructuring Agreement (MRA)
Agreement (MRA) yang sampai dengan laporan agreement which is still in process until the financial
keuangan diterbitkan perjanjian MRA tersebut masih report is published.
dalam proses.
6. INVESTASI JANGKA PENDEK 6. SHORT TERM INVESTMENTS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Deposito yang Dibatasi Penggunaannya Restricted of Time Deposit
PT Bank Mandiri (Persero) Tbk 8.448.200.000 8.448.200.000 PT Bank Mandiri (Persero) Tbk
Jumlah 8.448.200.000 8.448.200.000 Total
Merupakan deposito berjangka Perusahaan yang Represent Company’s restricted time deposits due
dibatasi penggunaannya sampai dengan setahun three months until one year and certificates of time
dan sertifikat deposito berjangka yang dijadikan deposits are pledged as collateral for long term bank
jaminan atas pinjaman bank jangka panjang . loans.
7. PIUTANG USAHA - BERSIH 7. ACCOUNTS RECEIVABLE - NET
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi Related Parties
Piutang Usaha Jasa Konstruksi - Bersih 2.494.466.731.547 1.160.946.118.804 Construction Service Receivables - Net
Dikurangi: Aset Keuangan Less: Financial Asset
Saling Hapus (358.766.136.453) (358.766.136.453) Offset
Piutang Dagang - Bersih 401.972.556.286 326.551.806.285 Trade Receivables - Net
Sub Jumlah 2.537.673.151.380 1.128.731.788.636 Sub Total
Pihak Ketiga Third Parties
Piutang Usaha Jasa Konstruksi - Bersih 176.129.496.519 321.346.496.031 Construction Service Receivables - Net
Piutang Dagang - Bersih 176.118.310.281 193.573.139.280 Trade Receivables - Net
Piutang Sewa 12.291.020.518 6.672.156.663 Rent Receivables
Sub Jumlah 364.538.827.318 521.591.791.974 Sub Total
Jumlah 2.902.211.978.698 1.650.323.580.610 Total
Rincian saldo piutang usaha jasa konstruksi dan The details of construction service receivables and
piutang dagang adalah sebagai berikut: trade receivables are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
PT Trans Jabar Tol 1.318.827.341.630 --
PT Kresna Kusuma Dyandra Marga 394.003.349.715 394.003.349.715
PT Hutama Karya (Persero) 358.766.136.453 358.766.136.453
PT Cimanggis Cibitung Tollways 255.772.154.806 221.496.074.334
PT Citra Karya Jabar Tol 187.272.727.273 187.272.727.273
PT Kertas Leces (Persero) 68.612.544.049 68.612.544.049
PT Cibitung Tanjung Priok Port Tollways 67.664.846.893 19.999.999.983
PT Istaka Karya (Persero) 28.506.203.880 28.506.203.880
PT Dok dan Perkapalan Kodja Bahari (Persero) 26.260.305.600 26.260.305.600
PT Patra Jasa 22.981.547.488 23.969.562.433
PT Bukit Asam (Persero) Tbk 2.733.046.519 40.141.278.791
PT Angkasa Pura I (Persero) 60.604.421 11.619.162.921
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 24.011.035.813 37.125.030.630
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
Less: Allowance For Impairment Expected Credit of Account Receivables (261.005.112.993) (256.826.257.258)
Sub Jumlah/ Sub Total 2.494.466.731.547 1.160.946.118.804
- 70 -
Page 68
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Ketiga/ Third Parties
PT Broadbiz Asia 106.596.781.459 106.596.781.459
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 104.284.900.422 207.005.934.100
PT Trikarya Graha Utama 100.650.939.502 100.650.939.502
PT Bangun Investa Graha 93.137.768.963 93.137.768.963
Bin Ladin Contractor Group LLC 53.000.910.398 53.000.910.398
Pemerintah Daerah/ District Governments 50.710.681.966 59.494.742.776
PT Royal Abadi Dentalindo 28.271.313.824 28.286.313.824
The Special Administrative Region of Oenuno - Timor Leste 21.098.152.608 21.098.152.608
Crown Prince Court 3.916.436.225 24.759.737.309
Kementerian Agama/ The Ministry of Religious Affairs -- 29.029.572.215
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 156.544.903.855 132.810.845.729
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
Less: Allowance For Impairment Expected Credit of Account Receivables (542.083.292.703) (534.525.202.852)
Sub Jumlah/ Sub Total 176.129.496.519 321.346.496.031
Jumlah/ Total 2.670.596.228.066 1.482.292.614.835
Mutasi cadangan kerugian penurunan nilai piutang The movements in allowance for impairment losses
usaha jasa konstruksi adalah sebagai berikut: on construction service receivables are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Saldo Awal (791.351.460.110) (717.746.215.014) Beginning Balance
Penambahan PSAK 71 Tahun Berjalan (12.591.120.379) (70.552.449.509) Addition of PSAK 71 for Current Year
Pemulihan PSAK 71 Tahun Berjalan 3.380.108.794 80.057.641.530 Recovery of PSAK 71 for Current Year
Pelepasan Entitas Anak (2.525.934.001) -- Divestment of Subsidiaries
Reklasifikasi -- (83.110.437.117) Reclassification
Saldo Akhir (803.088.405.696) (791.351.460.110) Ending Balance
Manajemen berpendapat bahwa cadangan The management believes that allowance for
penurunan nilai piutang usaha jasa konstruksi adalah impairment losses on construction service
cukup untuk menutupi kerugian yang mungkin timbul receivables is sufficient to cover the possible losses
dari tidak tertagihnya piutang tersebut. Manajemen on uncollectible receivables. The management also
juga berpendapat bahwa tidak terdapat risiko yang believes that there is no significant risk concentration
terkonsentrasi secara signifikan atas piutang usaha of credit risk on accounts receivable from one single
pada satu pelanggan. customer.
Rincian saldo piutang dagang - bersih sebagai The details of trade receivables - net are as follows:
berikut:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
PT Kresna Kusuma Dyandra Marga 375.779.270.492 375.779.270.492
PT Cimanggis Cibitung Tollways 181.257.313.543 130.932.551.379
PT Hakaaston 71.810.882.646 75.088.280.446
KSO/JO Waskita - Ninyda - Permata 23.106.212.638 --
PT Cibitung Tanjung Priok Port Tollways 19.673.743.349 19.231.943.021
PT Hutama Karya (Persero) 14.859.783.680 19.131.699.765
Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion ) 182.332.222.051 158.744.461.547
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Dagang/
Less: Allowance For Impairment Expected Credit of Trade Receivables (466.846.872.113) (452.356.400.365)
Sub Jumlah/ Sub Total 401.972.556.286 326.551.806.285
Pihak Ketiga/ Third Parties
PT Semutama Langgeng 435.000.000.000 435.000.000.000
Pelanggan dari/ Customer from Solterra 37.821.881.160 32.465.345.534
KSO/ JO RDMP Balikpapan 26.839.562.704 26.839.562.704
Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion ) 269.181.087.736 292.889.030.215
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Dagang/
Less: Allowance For Impairment Expected Credit of Trade Receivables (592.724.221.319) (593.620.799.173)
Sub Jumlah/ Sub Total 176.118.310.281 193.573.139.280
Jumlah/ Total 578.090.866.567 520.124.945.565
- 71 -
Page 69
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Mutasi cadangan kerugian penurunan nilai piutang The movements in allowance for impairment losses
dagang adalah sebagai berikut: on trade receivables are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Saldo Awal (1.045.977.199.538) (1.152.871.048.895) Beginning Balance
Pemulihan PSAK 71 Tahun Berjalan 896.577.854 196.690.767.829 Recovery of PSAK 71 for Current Year
Penambahan PSAK 71 Tahun Berjalan (14.490.471.748) (188.978.355.677) Addition of PSAK 71 for Current Year
Reklasifikasi -- 99.181.437.205 Reclassification
Saldo Akhir (1.059.571.093.432) (1.045.977.199.538) Ending Balance
Analisa piutang usaha berdasarkan umur adalah The analysis of accounts receivable based on age are
sebagai berikut: as follow:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Belum Jatuh Tempo 3.330.920.513.700 2.069.679.212.051 Not Yet Due
Sudah Jatuh Tempo Past Due
Sampai dengan 12 Bulan 119.067.273.391 112.175.545.994 Up to 12 Months
> 13 - 24 Bulan 19.509.580.820 29.671.087.229 >13 - 24 Months
> 25 - 36 Bulan 492.891.746.656 675.911.699.653 >25 - 36 Months
> 36 Bulan 802.482.363.259 600.214.695.331 >36 Months
Jumlah 4.764.871.477.826 3.487.652.240.258 Total
Piutang usaha dijaminkan pada bank-bank pemberi Account receivables are pledge as a collateral for
pinjaman jangka panjang, dengan rincian sebagai long-term bank loans, with details as
berikut: follows:
Nama Bank Piutang Usaha Dijaminkan pada Proyek-Proyek/ Nominal/
Bank Name Accounts Receivable Pledged on Projects Nominal
PT Bank Negara Indonesia Proyek Paket 1 Transmisi 500 KV: New Aur Duri - Peranap (Atas) 393.773.280.595
(Persero) Tbk Proyek Paket 2 Trans. 500 KV: Peranap - Perawang (Atas) 125.343.222.412
Proyek Paket 1 Transmisi 500 KV: New Aur Duri - Peranap (Pondasi) 36.901.638.116
Proyek Paket 2 Trans. 500 KV: Peranap - Perawang (Pondasi) 26.734.035.284
Proyek Bendungan Jlantah 152.063.225.216
Proyek Jalan Tol Jakarta - Cikampek II Sisi Selatan - Induk 1.820.277.046.758
Proyek Jalan Tol Jakarta - Cikampek II Sisi Selatan - Peralatan 10.253.234.179
Proyek Jalan Tol Prabumulih - Muara Enim 4.194.525.512.885
Proyek Pembangunan Jalan Tol Cibitung - Cilincing 640.814.058.364
PT Bank Mandiri Proyek Jalan Tol KAPB Paket I Seksi 1A 1.089.017.601.000
(Persero) Tbk Proyek Jalan Tol KAPB Paket I Seksi 1B 668.773.825.000
Proyek Tol Bekasi Cawang Kp. Melayu seksi 2A 121.289.274.634
Proyek Tol PPKA Seksi 3 14.916.472.468
Proyek Rentang Irrigation Modernization Project 109.247.817.237
Proyek Toll Cimanggis - Cibitung Seksi 2 1.084.547.445.960
Proyek Jembatan Kramasan - Kapal Betung 445.196.463.277
Proyek Jembatan Musi Tol Kapal Betung 506.803.211.568
Proyek Tol Jakarta - Cikampek II Elevated 62.720.926.414
Proyek Crossing Taman Mekar - Sadang 3.115.061.909
Proyek Jalan dan Kawasan Industri Sadai 13.892.121.400
Proyek Rest Area Bakter Paket 2 15.018.978.636
PT Bank Rakyat Indonesia Proyek Jalan Tol KAPB Paket IV Seksi 2A 96.535.240.128
(Persero) Tbk Proyek Jalan Tol Terbanggi Besar - Kayu Agung (Zona KLB-2) 129.527.863.157
Proyek Bandara Depati Amir 82.100.161.249
Proyek Jalan Tol Becakayu Seksi 2a - Ujung 186.781.629.022
Proyek Koneksi Tol Becakayu - Wiyoto Wiyono 157.870.486.589
Proyek Infrastruktur Pascapanen 7.957.150.563
Proyek Jambi Sewer Sistem B2 71.686.525.944
Proyek Jalan Tol TBPP VGF Cisumdawu 331.818.181.818
Proyek Jalan Tol Terbanggi Besar - Kayu Agung (Zona KLB-1) 110.617.880.130
Proyek Apartement Solterra Place 240.617.193.712
Proyek Jalan Tol Kayu Agung Palembang Betung Paket II Seksi 2A 781.958.527.716
Proyek Jalan Tol KAPB Paket IV Seksi 2A 96.535.240.128
PT Bank Syariah Proyek Apartemen Solterra 240.617.193.712
Indonesia Tbk Proyek Apartemen Yukata Alam Sutera 31.855.680.790
Proyek Bandara Depati Amir 82.100.161.249
- 72 -
Page 70
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Nama Bank Piutang Usaha Dijaminkan pada Proyek-Proyek/ Nominal/
Bank Name Accounts Receivable Pledged on Projects Nominal
Proyek Bendungan Bener Paket II (100%) 280.105.384.708
Proyek Bendungan Jlantah (65%) 152.063.225.216
Proyek Bendungan Jragung Paket 1 458.780.417.950
Proyek Bendungan Rukoh 305.115.172.822
Proyek Jalan Tol Kayu Agung-Palembang-Betung II (Seksi 1/ Induk) 3.325.917.209.320
Proyek Jalan Tol Kayu Agung-Palembang-Betung II (Seksi 2) 1.646.239.879.277
Proyek Jalan Tol Kayu Agung-Palembang-Betung IV (Seksi 2A) 96.535.240.128
Proyek Jalan Tol Kayu Agung Palembang-Betung Paket I Seksi 1A 1.089.017.601.000
Proyek Jalan Tol KLBM Seksi 1 217.110.434.443
Proyek Jalan Tol KLBM Seksi 2 164.710.393.607
Proyek Jalan Tol Pasuruan - Probolinggo (General) 79.972.476.773
Proyek Jalan Tol Pasuruan - Probolinggo (Seksi 2) 34.122.500.372
Proyek Jalan Tol Ruas Colomadu - Karanganyar 530.074.185
Proyek Jembatan Ogan - Kapal Betung 1.264.362.283.911
PT Bank Syariah Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1) 213.339.827.683
Indonesia Tbk Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1A) 218.897.377.334
Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 2) 231.878.400.444
Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 3) 173.130.219.438
Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 4) 296.860.174.382
Proyek SUTT 150 KV Sangatta - Maloy Section 3 35.480.325.689
Proyek Terminal Bandara Internasional Minangkabau 36.804.330.401
Proyek Tol Becakayu Koneksi Wiyoto Wiyono 157.870.486.589
Proyek Tol Becakayu Seksi 2A 121.289.274.634
Proyek Tol Becakayu Seksi 2A Ujung 186.781.629.022
Proyek Tol Ciawi - Sukabumi Seksi 2 1.408.988.320.575
Proyek Tol Cibitung - Cilincing Seksi 1 399.180.567.575
Proyek Tol Cibitung - Cilincing Seksi 2 241.633.490.789
Proyek Tol Cimanggis - Cibitung Seksi 2 1.084.547.445.960
Proyek Tol Jakarta - Cikampek II Elevated 62.720.926.414
Proyek Tol Jakarta Pematang Panggang (VGF JJS 1) 70.654.401.064
Proyek Jln Tol Terbanggi - Pematang Panggang (VGF JJS 2) 90.659.605.938
Proyek Nines Plaza dan Residence 337.942.464.435
Proyek Pabrik Baja WKI Cikande - Serang 13.709.293.296
Proyek Gardu Induk Tegangan Ekstra Tinggi 500 KV Peranap (46%) 40.025.922.946
Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1) 213.339.827.683
PT Bank Syariah Proyek Paket 1 Transmisi 500 KV: New Aur Duri - Peranap (Atas) 393.773.280.595
Indonesia Tbk Proyek Pkt. 2 Trans. 500 KV: Peranap - Perawang (Tanah) 12.097.980.705
Proyek Rest Area Bakter Paket 2 15.018.978.636
Proyek Tol Jakarta - Cikampek II Sisi Selatan - Induk 1.820.277.046.758
Proyek Tol Kuala Tanjung - Inderapura (Zona 2) 279.827.579.228
Proyek Underpass MM2100 - Cibitung 3.135.000.001
PT Bank Pan Indonesia Proyek Pembangunan Jalan Tol Kayu Agung - Palembang - Betung Paket 1.646.239.879.277
Tbk II seksi 2
Proyek Junction Tebing Tinggi 185.553.037.994
PT Bank Pembangunan Proyek Jalan Tol Ciawi - Sukabumi Seksi 2 1.408.988.320.575
Daerah Jawa Barat dan
Banten Tbk
PT Bank UOB Indonesia Proyek Tol Kuala Tanjung - Inderapura (Zona 1) 267.413.340.245
Proyek Tol Kuala Tanjung - Inderapura (Zona 2) 279.827.579.228
Proyek TPA Sampah Regional Manado Minahasa 12.346.443.758
PT Bank BTPN Tbk Proyek Jembatan Jalan Tol Kapal Betung (Ogan) 1.264.362.283.911
PT Bank Maybank Proyek Bendungan Rukoh Paket II 305.115.172.822
Indonesia Tbk
Bank of China Ltd Proyek GI. PLTU Kaltim - GI. New Balikpapan 150KV 3.902.194.105
Proyek Terminal Bandara Internasional Minangkabau 36.804.330.401
Proyek SUTT 150 KV Sangatta - Maloy seksi 2 12.971.170.813
PT Bank BNP Paribas Proyek Jalan Tol KAPB Paket IV Seksi 3B 76.609.516.590
Indonesia Proyek Gardu Induk Tegangan Ekstra Tinggi 500 KV Peranap (46%) 40.025.922.946
Sindikasi PT Bank BTPN Proyek Jalan Tol Kayu Agung - Palembang - Betung II Seksi 1, Proyek 3.325.917.209.320
Tbk, Bank of China (Hong Bendungan Temef NTT, Proyek Pembangunan Gedung Rektorat, Proyek
Kong) Limited Jakarta Gedung Fakultas dan Kawasan 3 Pilar Kampus Universitas Islam
Branch, PT Bank KEB Hana Internasional Indonesia (UIII) Paket I dan Proyek Bendungan Marga Tiga
Indonesia, PT Bank
- 73 -
Page 71
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Nama Bank Piutang Usaha Dijaminkan pada Proyek-Proyek/ Nominal/
Bank Name Accounts Receivable Pledged on Projects Nominal
Permata Tbk, PT Bank
OCBC NISP Tbk, PT Bank
China Construction Bank
Indonesia Tbk, PT Bank
CTBC Indonesia, PT Bank
Shinhan Indonesia, PT Bank
SBI Indonesia
Sindikasi PT Bank BTPN Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 213.339.827.683
Tbk, PT Bank Permata Tbk, Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1A) 218.897.377.334
PT Bank Resona Perdania, Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 2) 231.878.400.444
PT Bank Shinhan Indonesia, Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 3) 173.130.219.438
PT Bank QNB Indonesia Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 4) 296.860.174.382
Proyek Nines Plaza dan Residence 337.942.464.435
8. PIUTANG VENTURA BERSAMA 8. JOINT VENTURES RECEIVABLES
31 Maret/ 31 Desember/
Kemitraan/ Nama Proyek/ March 31, 2024 December 31, 2023
Venturer Project Name Rp Rp
Waskita - Arkitek Team Empat Revitalisasi Pusat Olahraga Ragunan 50.543.634.405 74.280.398.055
Waskita - Sumber Mitra Jaya - Pijar Utama APBD Sumut Zona 1 38.585.627.185 27.502.743.720
Waskita - Adhi KSO Bendungan Rukoh Paket II 24.555.799.772 22.700.844.845
Waskita - Nindya - LRS LRT Jakarta 8.884.902.650 31.387.433.905
Lain-lain/ Others
(di bawah/ below Rp 20 Milyar/ Billion ) 226.675.061.024 204.870.005.610
Jumlah/Total 349.245.025.036 360.741.426.135
Piutang ventura bersama merupakan pinjaman dan Joint venture receivables represent loan and
biaya ventura bersama yang dibayarkan terlebih advance payment of joint venture’s expenses paid
dahulu oleh Grup. by the Group.
Piutang ventura bersama tidak dikenakan bunga. Joint venture receivables were not subjected to
Piutang ini tidak memiliki jaminan dan akan dilunasi interest. These accounts have no collateral and are
pada saat diminta. repayable on demand.
Manajemen berpendapat bahwa piutang ventura Management believes that balances of joint venture
bersama dapat ditagihkan. receivables on demand.
Tidak memerlukan cadangan penurunan nilai, sebab No allowance for impairment loss was provided as
manajemen berpendapat bahwa piutang ventura management believes that balances of joint venture
bersama dapat ditagihkan. receivables are collectible.
9. ‘
PIUTANG RETENSI - BERSIH 9. RETENTION RECEIVABLES - NET
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi 1.898.918.642.939 1.792.990.908.773 Related Parties
Dikurangi: Aset Keuangan Less: Financial Asset
Saling Hapus (579.032.019.184) (579.032.019.184) Offset
Sub Jumlah 1.319.886.623.755 1.213.958.889.589 Sub Total
Pihak Ketiga 269.209.798.404 276.308.727.097 Third Parties
Sub Jumlah 269.209.798.404 276.308.727.097 Sub Total
Jumlah 1.589.096.422.159 1.490.267.616.686 Total
Rincian saldo piutang retensi adalah sebagai berikut: The details of retention receivables are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
PT Hutama Karya (Persero) 613.061.196.233 613.061.196.233
PT Cibitung Tanjung Priok Port Tollways 416.440.636.681 413.931.960.528
PT Jasamarga Japek Selatan 306.818.502.998 306.818.502.998
PT Cimanggis Cibitung Tollways 200.533.971.936 190.690.282.703
PT Trans Jabar Tol 151.146.207.050 --
PT Jasamarga Jalan Layang Cikampek 74.120.222.778 73.996.549.100
- 74 -
Page 72
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
PT Kresna Kusuma Dyandra Marga 71.938.039.640 72.734.427.122
PT Angkasa Pura II (Persero) 23.055.357.030 23.055.357.030
PT Jasamarga Solo Ngawi 530.074.185 35.972.307.716
PT Marga Trans Nusantara -- 33.985.678.043
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 68.170.136.369 55.867.595.826
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Retensi/
Less: Allowance For Impairment Expected Credit of Retention Receivables (26.895.701.961) (27.122.948.526)
Sub Jumlah/ Sub Total 1.898.918.642.939 1.792.990.908.773
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 157.600.791.789 162.360.143.800
Kementerian Pekerjaan Umum Republik
Demokrasi Timor Leste/ Ministry of Public Works
of the Democratic Republic of Timor Leste 62.532.422.032 62.532.406.615
Crown Prince Court 31.423.749.999 31.423.749.999
Bin Ladin Contractor Group LLC 27.707.741.349 27.707.741.349
PT Pardika Wisthi Sarana 23.431.420.350 23.431.420.350
Kementerian Transportasi dan Komunikasi Republik
Demokrasi Timor Leste/ Ministry of Transport and Communication
of the Democratic Republic of Timor Leste 22.962.827.497 22.962.827.497
Pemerintah Daerah/ District Governments 22.812.656.796 23.017.222.241
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 143.984.565.002 141.366.661.224
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Retensi/
Less: Allowance For Impairment Expected Credit of Retention Receivables (223.246.376.410) (218.493.445.978)
Sub Jumlah/ Sub Total 269.209.798.404 276.308.727.097
Jumlah/ Total 2.168.128.441.343 2.069.299.635.870
Mutasi cadangan kerugian penurunan nilai piutang The movements in allowance for impairment losses
retensi adalah sebagai berikut: on retention receivables are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Saldo Awal (245.616.394.504) (329.265.186.647) Beginning Balance
Penambahan PSAK 71 Tahun Berjalan (3.462.547.905) (41.230.005.911) Addition of PSAK 71 for Current Year
Pemulihan PSAK 71 Tahun Berjalan 7.193.627.406 126.878.798.054 Recovery of PSAK 71 for Current Year
Pelepasan Entitas Anak (8.256.763.368) -- Divestment of Subsidiaries
Reklasifikasi -- (2.000.000.000) Reclassification
Saldo Akhir (250.142.078.371) (245.616.394.504) Ending Balance
Manajemen berpendapat bahwa cadangan kerugian The management believes that allowance for
penurunan nilai piutang retensi adalah cukup untuk impairment losses on retention receivables is
menutupi kemungkinan tidak tertagihnya piutang sufficient to cover the possible losses on
retensi di kemudian hari. Manajemen juga the uncollectible retention receivables in the future.
berpendapat bahwa tidak terdapat risiko yang The management also believes that there is no
terkonsentrasi secara signifikan atas piutang retensi significant concentration of credit risk on retention
pada satu pelanggan. receivables from one single customer.
10. PIUTANG LAIN-LAIN - BERSIH 10. OTHER RECEIVABLE - NET
a. Piutang lain-lain lancar - bersih a. Other current receivables - net
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
KSO/JO WKR - Darmo Permai 327.200.280.935 326.657.423.641
KSO/JO WKR - Asiana Senopati 300.677.369.863 300.677.369.863
KSO/JO Waskita - Vision First 35.484.276.590 35.304.489.716
PT Jasamarga Solo Ngawi 22.720.159.494 22.720.159.494
PT Prima Multi Terminal 9.332.050.441 9.332.050.441
PT Kresna Kusuma Dyandra Marga 1.112.891.060 1.215.033.917
PT Cimanggis Cibitung Tollways 686.536.030 661.003.756
PT Trans Jabar Tol 119.141.307 --
- 75 -
Page 73
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
PT Asuransi Jiwasraya (Persero) -- 185.576.124.289
Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion ) 81.880.440.147 130.674.752.619
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Lain-lain/
Less: Allowance For Expected Credit of Other Receivables (43.417.690.447) (43.417.690.447)
Sub Jumlah/ Sub Total 735.795.455.420 969.400.717.289
Pihak Ketiga/ Third Parties
PT Yasa Patria Perkasa 66.648.296.573 66.648.296.573
Lembaga Manajemen Aset Negara 46.290.798.356 48.340.410.792
Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion ) 3.352.630.051 4.037.648.556
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Lain-lain/
Less: Allowance For Expected Credit of Other Receivables (65.814.988.832) (66.266.924.246)
Sub Jumlah/ Sub Total 50.476.736.148 52.759.431.675
Jumlah/ Total 786.272.191.568 1.022.160.148.964
Piutang lain-lain merupakan biaya yang dibayar Other current receivables consist of expenses
terlebih dahulu oleh Grup untuk pembebasan paid in advance by the Group for land acquisition.
lahan.
KSO WKR - Darmo Permai KSO WKR - Darmo Permai
Merupakan piutang terhadap KSO WKR - Darmo Represent receivable from KSO WKR - Darmo
Permai sebesar Rp172.500.000.000 Permai amounting to Rp172,500,000,000 based on
berdasarkan perjanjian No. 003/P. WKR/2017, agreement No. 003/P.WKR/2017, where in
Perusahaan juga mempunyai hak pengembalian the Company has right to reimburs ofVAT for
uang atas penyetoran PPN Masukan pada saat acquisition of land by the Company behalf of the joint
akuisisi tanah Perusahaan ke KSO sebesar venture amounting to Rp21,731,737,500, and
Rp21.731.737.500 dan penggantian biaya reimbursement of operational expense of KSO WKR
operasional KSO WKR - Darmo permai. - Darmo Permai.
KSO WKR - Asiana Senopati KSO WKR - Asiana Senopati
Pada tanggal 11 April 2019, Perusahaan On April 11, 2019, the Company entered into final
membuat perjanjian pengakhiran kerja sama joint operation agreement with PT Asiana Senopati
operasi dengan PT Asiana Senopati atas Proyek regarding project KSO WKR-Asiana Senopati based
KSO WKR-Asiana Senopati dengan Akta Notaris on Notarial Deed No. 002 of Ariani L. Rachim dated
oleh Ariani L. Rachim No. 002 tanggal 12 December 12, 2019 where in both parties agreed to
Desember 2019 dan menyetujui hak dan return each of their investment to PT Asiana
kewajibannya untuk mengembalikan Senopati to disclaim its obligation to WKR.
investasinya masing-masing dan PT Asiana
Senopati mengakui utang atas pengembalian
investasi WKR.
Lembaga Manajemen Aset Negara Lembaga Manajemen Aset Negara
Piutang lain-lain kepada Lembaga Manajemen Other current receivables from Lembaga
Aset Negara merupakan: Manajemen Aset Negara represent:
1. Piutang atas Dana Dukungan Pemerintah 1. Receivables of Government Support Fund
berdasarkan perjanjian Pengusahaan Jalan Tol based on Concession Agreement Pemalang
Ruas Jalan Pemalang - Batang sesuai akta - Batang Toll Road according to notarial
notaris No. 6 tanggal 31 Agustus 2018 dibuat deed No. 6 dated August 31, 2018 of notary
dihadapan Notaris Rina Utami Djauhari, S.H., Rina Utami Djauhari, S.H., with the total
dengan jumlah dana pengadaan tanah yang amount of land funds to be provided
harus disediakan adalah maksimum sebesar maximum is Rp1,400,000,000,000.
Rp1.400.000.000.000.
2. Piutang atas Dana Dukungan Pemerintah 2. Receivables of Government Support Fund
berdasarkan Amendemen V Perjanjian based on Amandment V Concession
Pengusahaan Jalan Tol Ruas Jalan Agreement Ciawi - Sukabumi Toll Road
Ciawi - Sukabumi sesuai akta notaris No. 18 according tonotarial deed No. 18 dated May
tanggal 31 Mei 2018 dibuat dihadapan Notaris 31, 2018 of notary Rina Utami Djauhari, S.H.
Rina Utami Djauhari, S.H.
3. Piutang atas Dana Dukungan Pemerintah 3. Receivables from Government Support
berdasarkan Amandemen Perjanjian Funds based on the Amendment to the
- 76 -
Page 74
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pengusahaan Jalan Tol Pasuruan - Probolinggo Pasuruan - Probolinggo (Paspro) Toll Road
(Paspro) No. XI Sesuai Akta No. 31 tanggal 24 Concession Agreement No. XI In
Januari 2023 dibuat dihadapan Notaris Rina accordance with Deed no. 31 dated 24
Utami Djauhari,S.H. January 2023 made before Notary Rina
Utami Djauhari, S.H.
Piutang lain-lain ini dikenakan bunga berdasarkan BI These other receivable bear interest based on
7 days Repo Rate pada tanggal dimulainya BI 7 days Repo Rate on the start date of
perhitungan biaya dana. the calculation of the cost of funds.
Grup membiayai terlebih dahulu kenaikan harga The Group paid in advance the appreciation
tanah dan selanjutnya akan mengajukan price of land and subsequently will be
permohonan dana kepada Pemerintah. reimbursed by the Government.
PT Yasa Patria Perkasa PT Yasa Patria Perkasa
Berdasarkan perjanjian No. 06/Kontrak-S1-C/2015 Based on Agreement No. 06/Kontrak-S1-
tanggal 23 November 2015, yang telah diubah C/2015 dated November 23, 2015, which was
dengan kontrak No. 023/ADD/KONTRAK-S1-C/2016 amended by contract No. 023/ADD/KONTRAK-
tanggal 1 September 2016, Perusahaan menunjuk S1-C/2016 dated September 1, 2016, the
PT Yasa Patria Perkasa sebagai kontraktor untuk Company appointed PT Yasa Patria Perkasa as
melaksanakan pekerjaan struktur tanah Seksi 1-C: the contractor for land structure work of Section
Sta 9+000 - Sta 13+400 ruas jalan tol Kayuagung- 1- C: Sta 9+000 - Sta 13+400 of Kayuagung-
Palembang-Betung dengan dengan nilai kontrak Palembang-Betung toll road with contract value
sebesar Rp398.521.411.000 (termasuk PPN). amounting to Rp398,521,411,000 (including
VAT).
Berdasarkan perjanjian No.01/KONTRAK.S1- Based on Agreement No.
A.B.CYPP/2016 tanggal 24 Februari 2016, 01/KONTRAK.S1A.B.C-YPP/2016 dated
Perusahaan menunjuk PT Yasa Patria Perkasa February 24, 2016, the Company appointed PT
sebagai kontraktor untuk melaksanakan pekerjaan Yasa Patria Perkasa the contractor for land
struktur tanah Seksi 1-A.B.C: Sta. 00+000 - Sta. structure work of section 1- A.B.C: Sta 00+000 -
13+400 ruas jalan tol Kayuagung - Palembang - Sta. 13+400 of Kayuagung - Palembang -
Betung dengan dengan nilai kontrak sebesar Betung toll road with contract value amounting
Rp554.410.156.000 (termasuk PPN). to Rp554,410,156,000 (including VAT).
Berdasarkan addendum kontrak No. 19/ADD/ Based on contract amendment No.
KONTRAK-YPP/2021 tanggal 5 November 2021, 19/ADD/KONTRAK-YPP/2021 dated November
Perusahaan menunjuk PT Yasa Patria Perkasa 5, 2021, the Company appointed PT Yasa Patria
sebagai kontraktor untuk melaksanakan pekerjaan Perkasa the contractor for toll road construction
pembangunan jalan tol Kayu Agung - Palembang - work Kayu Agung - Palembang - Betung of Sta.
Betung Sta. 90+690 - Sta. 97+000 dengan 90+690 - Sta. 97+000 with contract value
nilai kontrak sebesar Rp617.073.963.000 amounting to Rp617,073,963,000 (including
(termasuk PPN). VAT).
b. Piutang lain-lain tidak lancar – bersih b. Other non-current receivables – net
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
PT Kresna Kusuma Dyandra Marga 4.153.070.436.943 4.094.055.382.677
PT Cimanggis Cibitung Tollways 2.815.199.842.094 2.757.897.298.764
Indonesia Investment Authority (INA) 2.086.488.792.786 2.058.746.820.252
PT Trans Jabar Tol 818.319.197.672 --
PT Istaka Karya (Persero) 74.914.307.748 74.914.307.748
Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion) 9.009.648.886 9.009.648.886
Dikurangi: Penyisihan Kerugian Penurunan Nilai Piutang Lain-lain/
Less: Allowance for Losses of Other Receivables (142.656.869.657) (144.203.275.626)
Jumlah/ Total 9.814.345.356.472 8.850.420.182.701
- 77 -
Page 75
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
PT Kresna Kusuma Dyandra Marga (KKDM) PT Kresna Kusuma Dyandra Marga (KKDM)
Piutang lain-lain kepada PT KKDM digunakan Other receivable from PT KKDM was used for
untuk kebutuhan investasi dan operasional. Pada the purpose of investment and operations. On
tanggal 29 Desember 2022, WTR December 29, 2022, WTR and PT KKDM
dan PT KKDM menandatangani Perjanjian entered into Shareholder Loan Facility
Fasilitas Pinjaman Pemegang Saham Agreement No. ADD/17.14/WTR/1222 with
No. ADD/17.14/WTR/1222 dengan tingkat suku interest rates 12-12.65% per annum and will be
bunga sebesar 12-12,65% per tahun, dan akan due on December 30, 2023.
jatuh tempo pada tanggal 30 Desember 2023.
Perjanjian fasilitas pinjaman pemegang saham Shareholder loan facility agreement for
untuk kebutuhan investasi telah mengalami investing has been amended, most recently by
perubahan terakhir berdasarkan addendum addendum No. ADD/08.23/WTR/0523. The
No. ADD/08.22/WTR/0523. Pinjaman tersebut working capital loans bear an interest at 8.5%
dikenakan bunga 8,5% per tahun, yang jatuh per annum, with maturity date on May 3, 2028.
tempo pada tanggal 3 Mei 2028.
PT Cimanggis Cibitung Tollways (CCT) PT Cimanggis Cibitung Tollways (CCT)
Berdasarkan Perjanjian Fasilitas Pinjaman Based on Shareholder Loan Facility Agreement
Pemegang Saham No. 6/FPPS/WTR/2016 No. 6/FPPS/WTR/2016 dated May 24, 2016,
tanggal 24 Mei 2016, Group memberikan the Group provided a loan to CCT amounting to
pinjaman kepada CCT dengan nilai sebesar Rp1,036,287,057,882. The purpose of the loan
Rp1.036.287.057.882. Pinjaman ini digunakan facility is for land acquisition. This credit facility
untuk pembebasan tanah. Pinjaman ini berjangka is repayable in 6 months from the date of
waktu 6 bulan sejak tanggal pencairan pinjaman drawdrown and bears interest of 9.5% per
dan dikenakan bunga 9,5% per tahun dengan annum on a compounding interest method. On
metode perhitungan compound interest. Pada 27 December 27, 2017, the Company and WTR
Desember 2017, Perusahaan dan WTR setuju agreed to extend the loan agreement
untuk melakukan perpanjangan atas perjanjian amounting to Rp4,530,551,044,573 through
pinjaman sebesar Rp4.530.551.044.573 melalui Deed No. 33/ADD/FPPS/WTR/2017 bearing
Akta No. 33/ADD/FPPS/WTR/2017 dengan interest of Lembaga Penjamin Simpanan (LPS)
bunga yang dikenakan sebesar Lembaga + 1% per annum. According to the amendment
Penjamin Simpanan (LPS) + 1% per tahun. No. ADD/21.5/WTR/1221 dated December 29,
Sesuai addendum No. ADD/21.5/WTR/1221 2021, the term of this agreement is valid until
tanggal 29 Desember 2021, masa berlaku December 31, 2023.
perjanjian diperpanjang sampai dengan 31
Desember 2023.
Berdasarkan Fasilitas Pinjaman Pemegang Based on Shareholder Loan Facility Agreement
Saham No. 2/FPPS/WTR/2015 tanggal 11 Juli No. 2/FPPS/WTR/2015 dated July 11, 2015,
2015, Grup memberikan pinjaman dengan nilai The Group provided a loan to CCT amounting
sebesar Rp1.043.842.500. Pinjaman ini to Rp1,043,842,500. The purpose of the loan
digunakan untuk operasional. facility is for CCT’s operations.
Sesuai adendum No. ADD/20.1/ WTR/1222 According to amendment No. ADD/20.1/
tanggal 29 Desember 2022, jangka waktu WTR/1222 dated December 29, 2022, the term
pinjaman ini berlaku sampai dengan tanggal 30 of this agreement is valid until December 30,
Desember 2023 dan dikenakan bunga 2023, and bearing interest of 8.50% per annum.
8,50% per tahun.
Perjanjian fasilitas pinjaman pemegang saham Shareholder loan facility agreement for
untuk kebutuhan investasi telah mengalami investing has been amended, most recently by
perubahan terakhir berdasarkan addendum addendum No. ADD/08.30/WTR/0523. The
No. ADD/08.30/WTR/0523. Pinjaman tersebut working capital loans bear an interest at 9% per
dikenakan bunga 9% per tahun, yang jatuh tempo annum, with maturity date on May 3, 2028.
pada tanggal 3 Mei 2028.
Indonesia Investment Authority (INA) Indonesia Investment Authority (INA)
Piutang lain-lain kepada kepada Indonesia Other receivables from Indonesia Investment
Investment Authority (INA) merupakan piutang Authority (INA) represent receivable from
kepada PT Pejagan Pemalang Toll Road dan PT Pejagan Pemalang Toll Road and
PT Semesta Marga Raya yang dinovasikan
- 78 -
Page 76
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dengan bunga 5,5% dengan jangka waktu PT Semesta Marga Raya which are novated
pembayaran 10 tahun. with 5.5% interest with a tenor of 10 years.
PT Trans Jabar Tol (TJT) PT Trans Jabar Tol (TJT)
Piutang lain-lain kepada TJT merupakan Other receivables from TJT represent working
pinjaman modal kerja yang diberikan untuk capital loans provided for operational
kebutuhan investasi operasional dan cash investment needs and cash deficiency support
deficiency support (CDS). WTR juga mempunyai (CDS). WTR also has reimbursement
piutang reimbursment terkait beban umum dan receivables related to general and
administrasi pada TJT. administrative expenses at TJT.
Perjanjian fasilitas pinjaman pemegang saham The shareholder loan facility agreement for
untuk kebutuhan investasi telah mengalami investment needs has undergone the latest
perubahan terakhir berdasarkan addendum amendment based on addendum Number
Nomor ADD/08.25/WTR/0523 tanggal 3 Mei ADD/08.25/WTR/0523 dated May 3, 2023.
2023. Pinjaman tersebut dikenakan bunga The loan bears interest of 11.50% per year and
11,50% per tahun yang jatuh tempo pada tanggal matures on March 3, 2028.
3 Maret 2028.
PT Istaka Karya (Persero) PT Istaka Karya (Persero)
Piutang lain-lain PT Istaka Karya (Persero) Other receivables from PT Istaka Karya
sebesar Rp64.169.976.914 merupakan piutang (Persero) amounting to Rp64,169,976,914
Perusahaan yang diberikan berdasarkan were receivables given in accordance with
keputusan para Pemegang Saham Perusahaan the Decision of the Shareholders of the
di luar RUPS No. KEP-83/MBU/2011 dan Company outside of the GMS No. KEP-
No. KEP-PS04/PPA/0411 tanggal 1 April 2011. 83/MBU/2011 and No. KEPPS04/ PPA/0411
Pada tanggal 21 Mei 2011, Perusahaan dated April 1, 2011. On May 21, 2011,the
menerima Surat Pengakuan Utang No. Company received a Letter of Debt
L.05B/P/WK/2011 dan No. DU-SP/2011.01B dari Acknowledgement No. L.05B/P/ WK/2011 and
PT Istaka Karya (Persero) sebesar No. DU-SP/2011.01B from PT Istaka Karya
Rp64.169.976.914. (Persero) amounting to Rp64,169,976,914.
Pada tanggal 12 April 2011, PT Istaka Karya On April 12, 2011, PT Istaka Karya (Persero)
(Persero) memohon kepada Perusahaan sesuai requested to the Company through letter
surat No. DK/2011-323 untuk menerbitkan No. DK/2011-323 to issue a bank guarantee for
garansi bank proyek Bandar Lampung bypass Bandar Lampung bypass project amounting to
sebesar Rp10.661.885.000 dan biaya provisi Rp10,661,885,000 and the cost of provision for
untuk penerbitan garansi bank sebesar bank guarantee issuance amounting to
Rp312.445.834. Pada tanggal 30 Maret 2012, Rp312,445,834. On March 30, 2012, the bank
bank garansi No. 2011/JPU/GB/068/6148/ guarantee No. 2011/JPU/GB/068/6148/Monday
Monday telah dicairkan oleh pemilik proyek, has been executed by the owner of the project,
sehingga piutang Perusahaan kepada PT Istaka so that the receivables of the Company from PT
Karya (Persero) menjadi sebesar Istaka Karya (Persero) amounting to
Rp75.144.307.748. Rp75,144,307,748.
Ketidakmampuan PT Istaka Karya (Persero) Inability of PT Istaka Karya (Persero) in fulfilling
dalam memenuhi pembayaran utangnya its debt payments, caused the settlement of
menyebabkan penyelesaian utang dilakukan debt using Debt to Equity Swap to solve its debt,
dengan cara Debt to Equity Swap, yaitu para which means the creditors get a position as an
kreditur mendapatkan posisi sebagai pemegang equity holder of PT Istaka Karya (Persero) in
ekuitas PT Istaka Karya (Persero) sebagai line of payment for a debt of PT Istaka Karya
pengganti pembayaran atas utang PT Istaka (Persero) to the creditors. The payment of
Karya (Persero) kepada para kreditur. receivables will be settled partially on the 9th
Pembayaran piutang akan dilakukan secara year for a maximum of 5 years.
bertahap ditahun ke 9 sampai maksimal 5 tahun.
Berdasarkan surat dari Perusahaan According to the Company’s letters
No. 483/WK/Dir/2013 tanggal 7 Mei 2013 tentang No. 483/WK/Dir/2013 dated May 7, 2013
Pelaksanaan Putusan Pengesahan Perdamaian thats concerning the Execution of
(Homologasi) No. 23/PKPU/ 2012/PN.Niaga. Decision to Ratification of Peace
JKT.PST. Perusahaan meminta PT Istaka Karya (Homologation) No. 23/PKPU/2012/PN.Niaga.
(Persero) untuk menyelesaikan utangnya dengan JKT.PST. The Company asked PT Istaka Karya
skema penyelesaian sebagai berikut:
- 79 -
Page 77
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
(Persero) to resolve the debt with the following
settlement scheme:
1. Pembayaran awal senilai 3% atau sebesar 1. The intial payment valued at 3% or
Rp2.549.586.465. amounting to Rp2,549,586,465.
2. Pemenuhan sisa pembayaran senilai 97% 2. The fulfillment of the remaining payment
dari jumlah utang dalam bentuk penyertaan valued at 97% from the total debt in the form
saham sementara (Debt to Equity Swap) of temporary investments in share of stocks
sebesar Rp82.436.629.045. (Debt to Equity Swap) for
Rp82,436,629,045.
Berdasarkan surat di atas, Perusahaan Based on the above letters, the Company has
menerima jawaban PT Istaka Karya received the response from PT Istaka Karya
(Persero) dengan surat No. DU/2013-131 (Persero) with the letter No. DU/2013-131
tanggal 15 Mei 2013 yang berisi: dated May 15, 2013 that contains:
1. Pembayaran awal 3% bersumber dari 1. The intial payment of 3% from the
pencairan piutang atas eskalasi proyek disbursement of receivables of the
SKSD. escalation SKSD project.
2. Sisa pembayaran sebesar 97% dalam 2. The remaining payment of 97% in the form
bentuk penyertaan saham, sedang of investments in share of stocks, is being
dilakukan kajian oleh Kementrian Keuangan reviewed by the Ministry of Finance and
dan instansi terkait. related institutions.
Sampai dengan tanggal pelaporan, PT Istaka Until the date of the report, PT Istaka Karya
Karya (Persero) belum memenuhi sisa (Persero) has not fulfilled the remaining payment
pembayaran senilai 97% dari jumlah utang valued at 97% from the total debt in the form of
dalam bentuk penyertaan saham sementara temporary investments in shares of stock (Debt
(Debt to Equity Swap) sehingga Perusahaan to Equity Swap) thus the Company provided
membukukan cadangan kerugian penurunan allowance for impairment loss on receivable from
piutang kepada PT Istaka Karya (Persero) PT Istaka Karya (Persero) amounting to
sebesar Rp74.914.307.748 atau sebesar 100% Rp74,914,307,748 or 100% of the receivable.
dari nilai piutang. Tidak ada perubahan piutang There is no change in the balance of
pada 31 Maret 2024 dan 31 Desember 2023. the receivable as of March 31, 2024 dan 31
Desember 2023.
Sesuai dengan Peraturan Pemerintah Nomor 13 In accordance with Government Regulation
Tahun 2023 tentang Pembubaran, Perusahaan Number 13 of 2023 regarding Dissolution,
dinyatakan pailit berdasarkan putusan the Company was declared bankrupt based on
Pengadilan Niaga pada Pengadilan Negeri the decision of the Commercial Court at
Jakarta Pusat Nomor 26/Pdt.Pembatalan the Central Jakarta District Court Number
Perdamaian/2022/PN.Niaga.Jkt.Pst. tanggal 12 26/Pdt.Annulment of Peace/2022/PN.
Juli 2022, sehingga harta pailit Perusahaan Niaga.Jkt.Pst. dated July 12, 2022, so that
Persero (persero) berada dalam keadaan the bankrupt assets of the Company (Persero)
insolvensi. Penyelesaian pembubaran are in a state of insolvency. Completion of
Perusahaan Perseroan (Persero) sebagaimana the dissolution of the Company (Persero) as
dimaksud dalam pelaksanaan likuidasi dalam referred to in the liquidation implementation in
rangka pembubaran PT Istaka Karya sesuai the context of the dissolution of PT Istaka Karya
dengan ketentuan: in accordance with the provisions of:
- Peraturan perundang-undangan di bidang - Laws and regulation in state-owned
Badan Usaha Milik Negara; enterprises;
- Peraturan perundang-undangan di bidang - Laws and regulation in Bankruptcy
Kepailitan dan Penundaan Kewajiban Postponement of Debt Payment Obligations;
Pembayaran Utang;
- Peraturan perundang-undangan di bidang - Laws and regulation in Limited Liability
Perseroan Terbatas; Companies;
- Peraturan perundang-undangan lainnya. - Other laws and regulation
Dilaksanakan paling lambat 5 (lima) tahun Implemented at the latest in 5 (five) years from
terhitung sejak Perusahaan Perseroan (Persero) the time the Company (Persero) PT Istaka Karya
PT Istaka Karya dinyatakan pailit. Semua is declared bankrupt. All remaining assets from
kekayaan sisa hasil likuidasi Peusahaan the liquidation of the Company (Persero)
- 80 -
Page 78
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Perseroan (persero) PT Istaka Karya disetorkan PT Istaka Karya were deposited into the State
ke Kas Negara. Treasury.
Mutasi penyisihan kerugian penurunan nilai The movements in allowance for impairment
piutang lain-lain adalah sebagai berikut: losses on other receivables are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Saldo Awal (253.887.890.319) (335.206.427.351) Beginning Balance
Penambahan PSAK 71 Tahun Berjalan (53.528.375) (35.776.139.221) Addition of PSAK 71 for Current Year
Pemulihan PSAK 71 Tahun Berjalan 1.599.934.344 117.094.676.253 Recovery of PSAK 71 for Current Year
Pelepasan Entitas Anak 451.935.414 -- Divestment of Subsidiaries
Saldo Akhir (251.889.548.936) (253.887.890.319) Ending Balance
Manajemen berkeyakinan bahwa jumlah The management believes that the allowance for
cadangan kerugian penurunan nilai piutang impairment losses on other receivables is
lain-lain cukup untuk menutupi kemungkinan sufficient to cover the possible losses on
tidak tertagihnya piutang lainlain di kemudian the uncollectible other receivables in the future.
hari.
11. PERSEDIAAN 11. INVENTORIES - NET
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Bahan Baku Raw Materials
Konstruksi 224.314.259.313 260.147.584.898 Construction
Beton Precast 144.193.883.880 145.619.908.820 Precast Concrete
Produk Baja 21.718.053.439 22.965.816.005 Steel Products
Sub Jumlah 390.226.196.632 428.733.309.723 Sub Total
Persediaan dalam Pengembangan Work in Progress
Aset Real Estat 3.600.494.669.159 3.605.066.566.983 Real Estate Assets
Tanah yang Belum Dikembangkan 795.739.844 795.739.844 Undeveloped Land
Sub Jumlah 3.601.290.409.003 3.605.862.306.827 Sub Total
Persediaan untuk Dijual Inventory Available for Sale
Beton Precast 211.041.759.939 183.211.930.285 Precast Concrete
Tanah Kavling Siap Dijual 598.345.228 598.345.228 Lots of Land Ready for Sale
Produk Baja 58.128.757.373 58.128.757.373 Steel Products
Sub Jumlah 269.768.862.540 241.939.032.886 Sub Total
Jumlah 4.261.285.468.175 4.276.534.649.436 Total
Dikurangi: Penyisihan penurunan nilai Less: Allowance for decline in Value of
Persediaan (81.204.493.633) (84.070.121.299) Inventories
Jumlah 4.180.080.974.542 4.192.464.528.137 Total
Bahan baku konstruksi merupakan persediaan Raw construction materials represents construction
material dan perlengkapan proyek yang masih materials and equipment supply projects that are
tersedia di gudang proyek yang dimiliki oleh Grup. still available at the warehouse of existing projects
Persediaan material terdiri dari persediaan besi, owned by the Group. The raw materials consist of
semen, solar, tiang pancang, keramik/ marmer, iron, cement, diesel, pile, ceramic/ marble, traveler
traveler form, geotextile, aspal, dan batu. form, geotextile, asphalt, and stone.
Beton precast merupakan persediaan produk Precast concrete represents the inventory of
beton unit usaha precast yang terdiri dari concrete products of precast business units
persediaan barang jadi produk beton, persediaan consisting of concrete finished goods, raw
bahan baku, dan bahan penolong. materials and supporting materials.
Aset real estat merupakan bangunan apartemen Real estate assets represent apartment units
yang siap dijual, tanah yang sedang dikembangkan ready for sale, land under development and
dan bangunan yang sedang dikonstruksi buildings under construction.
Berdasarkan penelaahan atas kondisi persediaan Based on the review of the condition of inventories
pada akhir perode pelaporan, manajemen at the end of the reporting period, management
membentuk cadangan untuk penurunan nilai provide an allowance for decline in value of inventories
persediaan per 31 Maret 2024 dan on March 31, 2024 and December 31, 2023 amounting
31 Desember 2023 sebesar Rp81.204.493.633 to Rp81,204,493,633 and Rp84,070,121,299.
dan Rp84.070.121.299.
- 81 -
Page 79
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
12. TAGIHAN BRUTO KEPADA PENGGUNA JASA – 12. GROSS AMOUNTS DUE FROM CUSTOMERS –
BERSIH NET
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi 3.539.708.202.751 3.422.651.607.716 Related Parties
Dikurangi: Aset Keuangan Less: Financial Asset
Saling Hapus (100.627.186.615) (100.627.186.615) Offset
Sub Jumlah 3.439.081.016.136 3.322.024.421.101 Sub Total
Pihak Ketiga 1.403.168.836.082 1.174.684.646.350 Third Parties
Sub Jumlah 1.403.168.836.082 1.174.684.646.350 Sub Total
Jumlah 4.842.249.852.218 4.496.709.067.451 Total
Rincian saldo tagihan bruto kepada pengguna jasa The details of gross amount due from customers
adalah sebagai berikut: are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/
Related Parties
PT Perusahaan Listrik Negara (Persero) 1.481.633.988.999 1.495.583.872.266
PT Jasamarga Japek Selatan 1.176.487.042.323 1.174.269.822.434
PT Cimanggis Cibitung Tollways 579.179.032.843 429.455.522.283
PT Hutama Marga Waskita 491.303.367.684 501.810.629.234
PT Citra Karya Jabar Tol 144.545.454.545 144.545.454.545
PT Hutama Karya (Persero) 115.543.659.083 115.543.659.083
PT Cibitung Tanjung Priok Port Tollways 106.692.237.548 156.865.760.611
PT Kresna Kusuma Dyandra Marga 96.393.027.068 96.393.027.068
PT Angkasa Pura II (Persero) 51.465.575.377 51.465.575.376
PT Pelindo III (Persero)
PT Angkasa Pura I (Persero)
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 231.414.779.370 207.908.134.190
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Tagihan Bruto/
Less: Allowance For Impairment Expected Credit of Gross Amount due to from Customer (934.949.962.089) (951.189.849.374)
Sub Jumlah/ Sub Total 3.539.708.202.751 3.422.651.607.716
Pihak Ketiga/
Third Parties
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 947.154.275.679 706.657.626.088
PT Sulsel Citra Indonesia 137.685.920.529 137.685.920.529
The Special Administrative Region of Oecusse-Ambeno of Timor Leste 132.370.091.093 93.455.741.459
Pemerintah Daerah/ District Governments 132.147.277.310 140.605.318.459
Lain-lain/ Others (di bawah/ below Rp 50 Milyar/ Billion ) 1.264.370.493.079 1.285.891.053.816
Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Tagihan Bruto/
Less: Allowance For Impairment Expected Credit of Gross Amount due to from Customer (1.210.559.221.608) (1.189.611.014.002)
Sub Jumlah/ Sub Total 1.403.168.836.082 1.174.684.646.350
Jumlah/ Total 4.942.877.038.833 4.597.336.254.066
Informasi penting lainnya yang berkaitan dengan Other important information regarding gross
tagihan bruto kepada pengguna jasa adalah sebagai amount due from customers are as follows:
berikut:
1. PT Perusahaan Listrik Negara (Persero) (PLN) 1. PT Perusahaan Listrik Negara (Persero)
- Proyek Transmisi Sumatera 500 KVA (PLN) - Sumatera Transmission 500 KVA
Project
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction contract
untuk Pembangunan Transmisi Sumatera 500 for the Sumatera Transmission 500 kVA Package
kVA Paket 1 No. 0532.PJ/DAN.02.02/DIR/2015, 1 No. 0532.PJ/DAN.02.02/ DIR/2015, Package 2
Paket 2 No. ADD3-0533.PJ/DAN.02.02/ No. ADD3-0533.PJ/ DAN.02.02/DIR/2015, and
DIR/2015, dan Paket 3 No. ADD1-0372-I.PJ/ Package 3 No. ADD1-0372.I.PJ/DAN.02.02
DAN.02.02/DIR/2017 dengan nilai kontrak /DIR/2017 with a contract value of
masing-masing sebesar Rp4.026.285.529.669, Rp4,026,285,529,669, Rp2,680,113,182,455 and
Rp2.680.113.182.455 dan Rp2.684.429.824.467. Rp2,684,429,824,467, respectively.
- 82 -
Page 80
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
2. PT Jasamarga Japek Selatan - Proyek Jalan 2. PT Jasamarga Japek Selatan - Jakarta
Tol Jakarta Cikampek II Selatan Paket III Cikampek II Selatan Package III Toll Road
Project
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction
untuk pembangunan Jalan Tol contract for the Jakarta - Cikampek II
Jakarta - Cikampek II Selatan Paket III dengan Selatan Package III Toll Road Project with
nomor kontrak 03/KONTRAK.JJS/2019 dengan contract No. 03/KONTRAK.JJS/2019 with a
nilai kontrak sebesar Rp3.493.213.750.909. contract value of Rp3,493,213,750,909.
3. PT Cimanggis Cibitung Tollways - Jalan Tol 3. PT Cimanggis Cibitung Tollways - Jalan
Cimanggis Cibitung Seksi II Tol Cimanggis Cibitung Seksi II
Perusahaan mengadakan kontrak The Company entered into a
pekerjaan untuk pembangunan Jalan construction contract for the Cimanggis
Tol Cimanggis Cibitung Seksi II Cibitung Section II Toll Road Project
No. 22.01/DU-CCT/ADD/XII/2023 pada tanggal No. 22.01/DU-CCT/ADD/XII/2023 dated
22 Desember 2023 dengan nilai kontrak sebesar December 22, 2023 with acontract value of
Rp3.809.523.581.205 (tanpa PPN). Rp3,809,523,581,205 (Exclude VAT).
4. PT Hutama Marga Waskita - Proyek Jalan Tol 4. PT Hutama Marga Waskita - Tebing
Tebing Tinggi - Parapat Tinggi - Parapat Toll Road Project
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction
untuk pembangunan Jalan Tol Tebing contract for the Tebing Tinggi - Parapat Toll Road
Tinggi - Parapat No. 006/ADD.KONTRAK-HMW/ Project No. 006/ADD.KONTRAK-HMW/
VIII/2020 dengan nilai kontrak sebesar VIII/2020 with a contract value of
Rp2.197.007.509.090. Rp2,197,007,509,090.
5. PT Cibitung Tanjung Priok Port Tollways - 5. PT Cibitung Tanjung Priok Port Tollways -
Proyek Jalan Tol Cibitung Clincing Cibitung Clincing Toll Road Project
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction
untuk pembangunan Jalan tol Cibitung CIlincing contract for the Cibitung Cilincing Toll Road
sesuai dengan addendum perjanjian No. 007/ Project in accordance with the addendum of
ADD.IX/KONTRAK/WK-CTP/VI/2020 dengan agreement No. 007/ADD.IX/KONTRAK/WKCTP/
nilai kontrak sebesar Rp6.665.967.025.715 VI/2020 with the contract value of
(tanpa PPN). Rp6,665,967,025,715 (excluding VAT).
6. PT Hutama Karya (Persero) - Proyek 6. PT Hutama Karya (Persero) -
Pembangunan Jalan Tol Terbanggi Besar The Development of Terbanggi Besar -
Pematang Panggang Pematang Panggang Toll Road Project
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction contract
No. PBJT/AF.3459/S.Perj/59/2019 dengan nilai No. PBJT/AF.3459/S.Perj/59/2019 amounted to
kontrak sebesar Rp442.499.784.161 untuk Rp442,499,784,161 for the development of
pembangunan Jalan Tol Terbanggi Besar- Terbanggi Besar-Pematang Panggang Zona HK-
Pematang Panggang Zona HK-1, 1 Toll Road Project, amounted to
Rp1.778.742.359.383 untuk pembangunan Jalan Rp1,778,742,359,383 for the development of
Tol Terbanggi Besar-Pematang Panggang Zona Terbanggi Besar - Pematang Panggang Zona HK-
HK-2, Rp856.654.890.679 untuk pembangunan 2 Toll Road Project, Rp856,654,890,679 for
Jalan Tol Terbanggi Besar-Pematang Panggang the development of Terbanggi Besar - Pematang
Zona HK-3, dan Rp185.741.098.521 untuk Panggang Zona HK-3 Toll Road Project, and
pembangunan Jalan Tol Terbanggi Besar- Rp185,741,098,521 for the development of
Pematang Panggang Zona HK-4 Jembatan Terbanggi Besar - Pematang Panggang Zona
Sodong. HK-4 Sodong Toll Road Project.
7. PT Hutama Karya (Persero) - Proyek 7. PT Hutama Karya (Persero) - Pematang
Pematang Panggang - Kayu Agung Panggang - Kayu Agung Project
Perusahaan memperoleh kontrak pekerjaan The Company entered into a construction
No. PBJT/AF.3459/S.Perj/59/2019 untuk contract No. PBJT/AF.3459/S.Perj/59/2019
pembangunan Jalan Tol Pematang for the development of Pematang
Panggang - Kayu Agung dengan nilai kontrak Panggang - Kayu Agung Toll Road with a
sebesar Rp622.703.919.383 untuk Seksi 1, contract value of Rp622,703,919,383 for Section
sebesar Rp434.890.726.064 untuk Seksi 1a, 1, Rp434,890,726,064 for Section 1a,
- 83 -
Page 81
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
sebesar Rp1.827.814.190.904 untuk Seksi 2, Rp1,827,814,190,904 for Section 2,
sebesar Rp1.020.944.279.465 untuk Seksi 2a, Rp1,020,944,279,465 for Section 2a,
sebesar Rp506.693.608.324 untuk Seksi 2b, Rp506,693,608,324 for Section 2b,
sebesar Rp2.105.066.823.305 untuk Seksi 3, Rp2,105,066,823,305 for Section 3,
Rp1.388.581.735.869 untuk Seksi 4, dan Rp1,388,581,735,869 for Section 4, and
Rp517.365.548.368 untuk Seksi 4a. amounted to Rp517,365,548,368 for Section 4a.
8. PT Kresna Kusuma Dyandra Marga - Proyek 8. PT Kresna Kusuma Dyandra Marga - Bekasi
Jalan Tol Bekasi Cawang Kampung Melayu Cawang Kampung Melayu Toll Road Project
Perusahaan mengadakan kontrak pekerjaan The Companye entered into a construction
untuk pembangunan Jalan tol Bekasi Cawang contract for the Bekasi Cawang Kampung
Kampung Melayu sesuai dengan addendum Melayu Toll Road Project in accordance with
perjanjian No. 250/ADD-IV/S.Per/KKDM/V/2020 the addendum of agreement No. 250/ADD-
dengan nilai kontrak sebesar IV/S.Per/KKDM/V/2020 with a contract value of
Rp772.934.636.364 (tanpa PPN), Rp772,934,636,364 (excluding VAT),
No. 320/ADD-IX/SP/KKDM/VIII/2020 dengan No. 320/ADD-IX/SP/KKDM/VIII/2020 with a
nilai kontrak sebesar Rp383.324.235.111 (tanpa contract value of Rp383,324,235,111 (excluding
PPN), dan No. 331/AD-VIII/SP/KKDM/IX/2020 VAT), and No. 331/AD-VIII/SP/KKDM/IX/2020
dengan nilai kontrak sebesar with a contract value of Rp996,645,639,091
Rp996.645.639.091 (tanpa PPN). (excluding VAT).
9. PT Sulsel Citra Indah - Pembangunan Twin 9. PT Sulsel Citra Indah - The Development of
Tower Makassar Twin Tower Makassar
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction
untuk pembangunan proyek Pembangunan Twin contract on the development of Twin Tower
Tower Makassar No. 011/PJA-PT.SCI/DB- Makassar No. 011/PJA-PT.SCI/DBTTM/11/2020
TTM/11/2020 pada tanggal 01 Agustus 2017 dated August 1, 2017 with contract value of
dengan nilai kontrak sebesar Rp1,728,686,086,000.
Rp1.728.686.086.000.
10. Kementerian Pekerjaan Umum dan 10. Ministry of Public Works and Housing -
Perumahan Rakyat - Proyek Pembangunan The Development of Tanjung Lesung Special
Pengaman Pantai Kawasan Ekonomi Khusus Economic Zone Coastal Development Project
Tanjung Lesung
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction
untuk Proyek Pembangunan Pengaman Pantai contract for the Tanjung Lesung Special
Kawasan Ekonomi Khusus Tanjung Lesung Economic Zone Coastal Development Project
No. HK.02.03/09-ADD II/APBN/SP.II/2021 No. HK.02.03/09-ADDII/APBN/SP.II/2021 with a
dengan nilai kontrak sebesar contract value of Rp227,194,050,000
Rp227.194.050.000 (termasuk PPN). (including VAT).
11. Kementerian Pekerjaan Umum dan 11. Ministry of Public Works and Housing -
Perumahan Rakyat - Proyek Pembangunan The Development of Bener Dam Package II
Bendungan Bener Paket II
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction
untuk pembangunan Bendungan Bener Paket II contract for the development of Bener Dam
No. Add 03/KSO-WSKTJATIWANGI/BENER- Package II No. Add 03/KSOWSKTJATIWANGI/
02/2020 dengan nilai kontrak sebesar BENER-02/2020 with a contract value of
Rp557.877.638.182. Rp557,877,638,182.
12. Kementerian Pekerjaan Umum dan 12. Ministry of Public Works and Housing -
Perumahan Rakyat - Proyek Pembangunan The Development of Rukoh Dam Package II
Bendungan Rukoh Paket II
Perusahaan mengadakan kontrak pekerjaan The Company entered into a construction
untuk pembangunan Bendungan Rukoh Paket II contract for the development of Rukoh Dam
Add IV No. HK.01.02/Bws1.8.3/304 pada tanggal Package II Add IV No. HK.01.02/Bws1.8.3/304
27 Agustus 2020 dengan nilai kontrak sebesar dated August 27, 2020 with a contract value of
Rp595.368.766.619. Rp595,368,766,619.
- 84 -
Page 82
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Mutasi cadangan kerugian penurunan nilai tagihan The movements in allowance for impairment
bruto kepada pengguna jasa dan pekerjaan dalam losses on gross amount due from customers and
proses adalah sebagai berikut: work in progress are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Saldo Awal (2.140.800.863.376) (1.961.196.092.105) Beginning Balance
Penambahan PSAK 71 Tahun Berjalan (32.493.048.110) (600.528.269.377) Addition of PSAK 71 for Current Year
Pemulihan PSAK 71 Tahun Berjalan 14.509.613.834 434.994.498.194 Recovery of PSAK 71 for Current Year
Pelepasan Entitas Anak 13.275.113.955 -- Divestment of Subsidiaries
Reklasifikasi -- (14.071.000.088) Reclassification
Saldo Akhir/ Ending Balance (2.145.509.183.697) (2.140.800.863.376)
Manajemen berpendapat bahwa cadangan kerugian The management believes that allowance for
penurunan nilai tagihan bruto kepada pengguna jasa impairment losses of gross amount due from
adalah cukup untuk menutupi kemungkinan tidak customers is sufficient to cover the possible losses
tertagihnya tagihan bruto di kemudian hari. on the uncollectible gross amount due from
customers in the future.
Analisa tagihan bruto kepada pengguna jasa kepada The analysis of gross amount due from customers
pelanggan dan pekerjaan dalam proses berdasarkan and work in progress based on age are as follows:
umur adalah sebagai berikut:
2023 2022
Rp Rp
Belum Jatuh Tempo 3.788.068.170.388 3.196.213.538.878 Not Yet Due
Sudah Jatuh Tempo Past Due
Sampai dengan 180 Hari 969.949.585.107 808.766.635.575 Up to 180 Days
> 181 - 360 Hari 956.779.822.373 388.178.147.996 > 181 - 360 Days
> 360 Hari 1.272.961.458.047 2.244.351.608.378 > 360 Days
Jumlah 6.987.759.035.915 6.637.509.930.827 Total
13.
13. PERPAJAKAN 13. TAXES
a. Pajak Dibayar Dimuka a. Prepaid Taxes
2023 2022
Rp Rp
Pasal 4 (2) 17.278.429.355 17.125.243.794 Article 4(2)
Pasal 22 15.701.790.119 2.396.554.765 Article 22
Pasal 23 218.012.287.510 206.101.195.415 Article 23
Pasal 28A 2.231.220.847 13.203.308.245 Article 28A
Pajak Potong Pungut 24.804.386 --
Pajak Pertambahan Nilai 510.832.183.798 382.277.309.957 Value Added Tax
Jumlah 764.080.716.015 621.103.612.176 Total
b. Utang Pajak b. Taxes Payables
2023 2022
Rp Rp
Utang Pajak Jangka Pendek Short-Term Taxes Payable
Pasal 15 63.743.863 -- Article 15
Pasal 21 128.243.268.067 168.084.817.861 Article 21
Pasal 22 3.538.588.087 8.164.547.332 Article 22
Pasal 23 5.307.042.933 23.664.459.359 Article 23
Pajak Final Konstruksi 700.485.170.452 690.695.591.590 Construction Final Tax
Pajak Pertambahan Nilai 1.932.344.068.928 1.850.132.634.681 Value Added Tax
Pasal 4 (2) - Final 17.052.378.069 24.533.959.234 Article 4 (2) - Final
Pasal 29 7.226.743.557 9.827.332.223 Article 29
Pajak Hotel dan Restoran 1.369.938.943 1.937.705.083 Hotel and Restaurant Tax
Pajak Revaluasi 987.973.676 987.973.676 Revaluation Tax
Total Utang Pajak Jangka Pendek 2.796.618.916.575 2.778.029.021.039 Total Short-Term Taxes Payable
Utang Pajak Jangka Panjang Long-Term Taxes Payable
Pajak Final Konstruksi 283.619.686.764 283.619.686.764 Construction Final Tax
Total Utang Pajak Jangka Panjang 283.619.686.764 283.619.686.764 Total Long-Term Taxes Payable
Jumlah 3.080.238.603.339 3.061.648.707.803 Total
- 85 -
Page 83
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
c. Beban (Manfaat) Pajak Penghasilan c. Income Tax Expense (Benefit)
31 Maret/ March 31,
2024 2023
Rp Rp
Beban Pajak Kini Current Tax Expense
Entitas Anak 20.151.653.096 46.109.343.885 Subsidiaries
Beban (Manfaat) Pajak Tangguhan 1.208.359.753 255.906.893 Deferred Tax Expense (Benefit)
Jumlah 21.360.012.849 46.365.250.778 Total
d. Pajak Tangguhan d. Deferred Tax
(Dibebankan) Dikreditkan (Dibebankan)
Dikreditkan ke ke Penghasilan
Laba Rugi/(Charged) Komprehensif Lain/
1 Januari/ Penyesuaian/ Credited to Profit Credited to 31 Maret/
January 1, 2023 Adjustment or Loss Other Comprehensive Income March 31, 2024
Rp Rp Rp Rp Rp
Aset Pajak Tangguhan/
Deferred Tax Assets
TJT 708.793.983 (708.793.983) -- --
WTR 13.195.528.851 -- -- -- 13.195.528.851
WTTR 10.776.018 -- -- -- 10.776.018
WBW 12.808.875 -- 543.627 -- 13.352.502
PBTR 175.346.083 -- -- -- 175.346.083
WST -- -- -- -- --
Jumlah Aset Pajak Tangguhan/
Total Deferred Tax Assets 14.103.253.810 (708.793.983) 543.627 -- 13.395.003.454
Liabilitas Pajak Tangguhan/
Deferred Tax Liabilities
WST 20.875.987 -- -- -- 20.875.987
WKR 7.126.727.164 -- (1.208.903.381) -- 8.335.630.545
Jumlah Liabilitas Pajak Tangguhan/
Total Deferred Tax Liabilities 7.147.603.151 -- (1.208.903.381) -- 8.356.506.532
(Dibebankan) Dikreditkan (Dibebankan)
Dikreditkan ke ke Penghasilan
Laba Rugi/(Charged) Komprehensif Lain/
1 Januari/ Penyesuaian/ Credited to Profit Credited to 31 Desember/
January 1, 2023 Adjustment or Loss Other Comprehensive Income December 31, 2023
Rp Rp Rp Rp Rp
Aset Pajak Tangguhan/
Deferred Tax Assets
TJT 379.438.312 -- 273.503.446 55.852.225 708.793.983
WTR 12.208.180.052 -- 991.609.175 (4.260.376) 13.195.528.851
WTTR 12.960.498 -- (2.184.480) -- 10.776.018
WBW 2.002.543.709 -- (1.989.734.834) -- 12.808.875
PBTR 67.978.740 -- 107.367.343 -- 175.346.083
WST 21.704.343 -- (21.704.343) -- --
Jumlah Aset Pajak Tangguhan/
Total Deferred Tax Assets 14.692.805.654 -- (641.143.693) 51.591.849 14.103.253.810
Liabilitas Pajak Tangguhan/
Deferred Tax Liabilities
WST -- -- (20.875.987) -- 20.875.987
WKR 6.100.593.183 -- (1.026.133.981) -- 7.126.727.164
Jumlah Liabilitas Pajak Tangguhan/
Total Deferred Tax Liabilities 6.100.593.183 -- (1.047.009.968) -- 7.147.603.151
e. Administrasi Pajak e. Tax Administration
Surat Ketetapan Pajak Tax Assessment Letters
Perusahaan menerima Surat Tagihan Pajak The Company has received Tax Collection Letter
sebesar Rp6.641.750.124 terkait denda pajak, amounting to Rp6,641,750,124 related to
sebagai berikut: administrative sanction of tax, as follows:
Jenis Pajak/ Masa Pajak/ Terima (Bayar)/
Type of Tax Period Nomor STP/ Tanggal/ STP/ Cash Receipt
No Taxes STP Number Date Tax Collection Letter (Payment)
1 PPh Pasal 21 6/2023 00060/101/23/307/24 27-Mar-24 (5.898.789) Bayar/ Payment
2 PPh Pasal 21 7/2023 00061/101/23/307/24 27-Mar-24 (1.723.599) Bayar/ Payment
3 PPh Pasal 21 7/2023 00028/101/23/437/24 28-Mar-24 (148.433) Bayar/ Payment
4 PPN Dalam Negeri 7/2019 00019/187/19/093/24 27-Mar-24 (2.261.578.173) Belum dibayar/ Unpayment
5 PPN Dalam Negeri 3/2019 00015/187/19/093/24 27-Mar-24 (127.505.980) Belum dibayar/ Unpayment
6 PPN Dalam Negeri 8/2019 00020/187/19/093/24 27-Mar-24 (35.267.823) Belum dibayar/ Unpayment
7 PPN Dalam Negeri 4/2019 00016/187/19/093/24 27-Mar-24 (18.550.438) Belum dibayar/ Unpayment
- 86 -
Page 84
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Jenis Pajak/ Masa Pajak/ Terima (Bayar)/
Type of Tax Period Nomor STP/ Tanggal/ STP/ Cash Receipt
No Taxes STP Number Date Tax Collection Letter (Payment)
8 PPN Dalam Negeri 5/2019 00017/187/19/093/24 27-Mar-24 (127.453.659) Belum dibayar/ Unpayment
9 PPN Dalam Negeri 10/2019 00021/187/19/093/24 27-Mar-24 (2.465.859.499) Belum dibayar/ Unpayment
10 PPN Dalam Negeri 11/2019 00022/187/19/093/24 27-Mar-24 (1.557.054.365) Belum dibayar/ Unpayment
11 PPN Dalam Negeri 12/2019 00023/187/19/093/24 27-Mar-24 (36.800.282) Belum dibayar/ Unpayment
12 PPN Dalam Negeri 6/2019 00018/187/19/093/24 27-Mar-24 (3.909.084) Belum dibayar/ Unpayment
Jumlah/ Total (6.641.750.124)
Perusahaan menerima Surat Ketetapan Pajak The Company has received Tax Assessments
sebesar Rp10.239.305.403 terkait denda pajak, Letter amounting to Rp10,239,305,403 related to
sebagai berikut: administrative sanction of tax, as follows:
No Jenis Pajak/ Masa Pajak/ Terima (Bayar)/
Type of Tax Period Nomor SKP/ Tanggal/ SKPKB/ Under Cash Receipt
Taxes SKP Number Date Payment Assessment (Payment)
1 PPh Final Pasal 4 ayat (2) 12/2019 00004/240/19/093/24 27-Mar-24 927.931.014 Belum dibayar/ Unpayment
2 PPh Final Pasal 4 ayat (2) 3/2019 00003/240/19/093/24 27-Mar-24 7.703.746 Belum dibayar/ Unpayment
3 PPh Pasal 21 1-12/2019 00003/201/19/093/24 27-Mar-24 820.881.581 Belum dibayar/ Unpayment
4 PPh Pasal 22 12/2019 00003/202/19/093/24 27-Mar-24 406.977.981 Belum dibayar/ Unpayment
5 PPh Pasal 22 3/2019 00002/202/19/093/24 27-Mar-24 17.540.976 Belum dibayar/ Unpayment
6 PPh Pasal 23 12/2019 00003/203/19/093/24 27-Mar-24 656.347.877 Belum dibayar/ Unpayment
7 PPh Pasal 25/29 Badan 1-12/2019 00002/206/19/093/24 27-Mar-24 3.155.173.288 Belum dibayar/ Unpayment
8 PPN Dalam Negeri 12/2019 00023/207/19/093/24 27-Mar-24 265.665.477 Belum dibayar/ Unpayment
9 PPN Dalam Negeri 5/2019 00016/207/19/093/24 27-Mar-24 111.353.309 Belum dibayar/ Unpayment
10 PPN Dalam Negeri 6/2019 00017/207/19/093/24 27-Mar-24 390.798.142 Belum dibayar/ Unpayment
11 PPN Dalam Negeri 7/2019 00018/207/19/093/24 27-Mar-24 533.291.722 Belum dibayar/ Unpayment
12 PPN Dalam Negeri 8/2019 00019/207/19/093/24 27-Mar-24 85.773.135 Belum dibayar/ Unpayment
13 PPN Dalam Negeri 9/2019 00020/207/19/093/24 27-Mar-24 133.543.190 Belum dibayar/ Unpayment
14 PPN Dalam Negeri 10/2019 00021/207/19/093/24 27-Mar-24 111.932.671 Belum dibayar/ Unpayment
15 PPN Dalam Negeri 11/2019 00022/207/19/093/24 27-Mar-24 2.118.189.476 Belum dibayar/ Unpayment
16 PPN Dalam Negeri 3/2019 00014/207/19/093/24 27-Mar-24 385.385.502 Belum dibayar/ Unpayment
17 PPN Dalam Negeri 4/2019 00015/207/19/093/24 27-Mar-24 110.816.316 Belum dibayar/ Unpayment
Jumlah/ Total 10.239.305.403
14. UANG MUKA DAN BIAYA DIBAYAR DIMUKA 14. ADVANCES AND PREPAYMENTS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
PPN Keluaran Yang Belum Diterima 625.527.756.774 270.032.397.189 VAT Out Not Yet Received
Uang Muka Investasi 280.000.000.000 280.000.000.000 Advances for Investment
Uang Muka Kontrak 235.317.244.928 171.166.332.248 Advances for Contracts
Biaya Dibayar Dimuka 101.495.981.650 80.105.857.625 Prepaid Expenses
Uang Muka Beban Umum Advances for General
dan Administrasi 7.314.809 16.944.439 and Administration
Lain-lain 4.906.193.752 9.781.112.963 Others
Jumlah 1.247.254.491.913 811.102.644.464 Total
Pajak Pertambahan Nilai (PPN) Keluaran yang belum Value Added Tax (VAT) Out which are not yet
diterima merupakan pengakuan PPN keluaran atas received represents recognition of VAT output on
termin yang telah ditagihkan, namun belum dibayar receivables, for which the project owner have not
oleh pemberi kerja. yet paid.
Biaya dibayar dimuka terdiri dari transaksi seperti; Prepaid expenses consist of transaction such as;
kontrak sewa jangka pendek, premi asuransi dibayar short-term rental contracts, prepaid insurance
dimuka, dan pendapatan yang diterima dimuka. premiums, and unearned income.
Uang muka kontrak diberikan kepada subkontraktor, Advances for contracts represent payment to
pemasok dan mandor borong yang bekerja pada subcontractors, suppliers and the entire stock who
proyek yang dilaksanakan oleh Grup. Penyelesaian worked on the Group’s projects. The settlement of
uang muka akan diperhitungkan dengan termin yang advance will be calculated based on the invoice
akan dibayarkan kepada pihak ketiga yang that will be paid related to third parties concerned.
bersangkutan.
Uang muka investasi merupakan pembayaran Advances for investment represent payments to
kepada PT Asuransi Jiwasraya (Persero) atas surat PT Asuransi Jiwasraya (Persero) for the offering
penawaran kerjasama aset properti investasi melalui letter of joint investment property assets through a
konsorsium Perusahaan, PT Wijaya Karya (Persero) consortium of the Company, PT Wijaya Karya
- 87 -
Page 85
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Tbk, PT Pembangunan Perumahan (Persero) Tbk, (Persero) Tbk, PT Pembangunan Perumahan
PT Adhi Karya (Persero) Tbk, dan PT Hutama Karya (Persero) Tbk, PT Adhi Karya (Persero) Tbk, and
(Persero). Perjanjian konsorsium tersebut terbentuk PT Hutama Karya (Persero). The Consortium
untuk melakukan optimalisasi properti (tanah dan agreement was formed to optimize the property
bangunan) milik PT Asuransi Jiwasraya (Persero) (land and building) owned by PT Asuransi
sesuai dengan Perjanjian No. 161.SJ.U.1018 Jiwasraya (Persero) in accordance with agreement
dan No. TP.01.03/A.DIR.16877/2018 tanggal No. 161.SJ.U.1018 and No. TP.01.03/A.DIR.
11 Oktober 2018. 16877/2018 dated October 11, 2018.
Sesuai dengan perjanjian pendahuluan antara In accordance with the preliminary agreements
PT Asuransi Jiwasraya (Persero) dengan konsorsium between PT Asuransi Jiwasraya (Persero) with a
BUMN Karya bahwa tanda minat atas rencana consortium of BUMN Karya that the sign of interest
pengembangan atau pengalihan hak in the development plan or transfer of rights to
atas obyek optimalisasi adalah sebesar the optimization object is Rp1,400,000,000,000.
Rp1.400.000.000.000. Jumlah pembagian porsi The number of servings for each BUMN Karya is
untuk masing-masing BUMN Karya adalah 20%, 20%, so the amount of company's inclusion in
sehingga jumlah penyertaan Perusahaan dalam the consortium is Rp280,000,000,000.
konsorsium tersebut adalah Rp280.000.000.000.
15. INVESTASI PADA ENTITAS ASOSIASI DAN 15. INVESTMENT IN ASSOCIATES AND JOINT
VENTURA BERSAMA VENTURES
Rincian saldo investasi pada entitas asosiasi dan The details of investments in associates and joint
ventura bersama adalah sebagai berikut: ventures are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Investasi pada Entitas Asosiasi/ Investments in Associates 102.661.278.766 121.273.092.924
Investasi pada Ventura Bersama/ Investments in Joint Ventures 3.731.357.567.044 2.201.740.173.004
Jumlah/ Total 3.834.018.845.810 2.323.013.265.928
Investasi pada asosiasi Investment in associates
Rincian saldo investasi pada asosiasi adalah sebagai Details of investments in associates are as follows:
berikut:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023 Aktivitas utama/ Kedudukan/
Rp Rp Principal activity Domicile
PT Cimanggis Cibitung Tollways 82.843.323.854 101.466.409.981 Operator Jalan Tol/ Toll operator Indonesia
PT Hotel Karya Indonesia 16.067.954.912 16.056.682.943 Hotel/ Hotel Indonesia
PT Waskita Bali Mandara 3.750.000.000 3.750.000.000 Operator Jalan Tol/ Toll operator Indonesia
Jumlah/ Total 102.661.278.766 121.273.092.924
Rincian dan mutasi investasi pada entitas asosiasi The details of ownership interest and movements
pada tanggal 31 Maret 2024 dan 31 Desember 2023 of investment in associates entities as of
adalah sebagai berikut: March 31, 2024 and December 31, 2023 are as
follows:
31 Maret / M arch 31, 2024
Bagian laba (rugi)
Saldo awal/ entitas asosiasi/
Beginning Penambahan/ Equity in net income profit Pengurangan/ Penyesuaian/ Saldo akhir/
% balance Addition (loss) of associates Deduction Adjustment Ending balance
Rp Rp Rp Rp Rp Rp
PT Cimanggis Cibitung Tollways 35,00 101.466.409.981 -- (18.623.086.127) -- -- 82.843.323.854
PT Hotel Karya Indonesia 25,00 16.056.682.943 -- 11.271.969 -- -- 16.067.954.912
PT Waskita Bali Mandara 60,00 3.750.000.000 -- -- -- -- 3.750.000.000
Jumlah/ Total 121.273.092.924 -- (18.611.814.158) -- -- 102.661.278.766
31 Desember / December 31, 2023
Bagian laba (rugi)
Saldo awal/ entitas asosiasi/
Beginning Penambahan/ Equity in net income profit Pengurangan/ Penyesuaian/ Saldo akhir/
% balance Addition (loss) of associates Deduction Adjustment Ending balance
Rp Rp Rp Rp Rp Rp
PT Cimanggis Cibitung Tollways 35,00 150.223.355.789 -- (48.756.945.808) -- -- 101.466.409.981
PT Hotel Karya Indonesia 25,00 16.012.248.918 -- 44.434.025 -- -- 16.056.682.943
PT Waskita Bali Mandara 60,00 3.750.000.000 -- -- -- -- 3.750.000.000
Jumlah/ Total 169.985.604.707 -- (48.712.511.783) -- -- 121.273.092.924
- 88 -
Page 86
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
PT Cimanggis Cibitung Tollways (CCT) PT Cimanggis Cibitung Tollways (CCT)
Pendirian PT CCT (kepemilikan tidak langsung The establishment of PT CCT (indirect ownership
melalui WTR) adalah sesuai dengan akta notaris through WTR) was based on notarial deed No. 52
No. 52 tanggal 22 Februari 2008 dari notaris Agus dated February 22, 2008 of notary Agus Madjid,
Madjid, S.H. M.Kn. Akta pendirian ini telah mendapat S.H. M.Kn. The deed was approved by the Minister of
persetujuan oleh Menteri Hukum dan Hak Asasi Law and Human Rights through decision letter No.
Manusia melalui surat keputusan No. AHU- AHU-09738.AH.01.01.Tahun.2008 dated February
09738.AH.01.01.Tahun.2008 tanggal 27 Februari 27, 2008.
2008.
Selanjutnya, peralihan pemegang saham PT CCT Furthermore, the change in ownership of PT CCT
kepada WTR dilakukan berdasarkan dengan akta to WTR was based on notarial deed No. 30 dated
notaris No. 30 tanggal 13 Juli 2015 dari notaris Jose July 13, 2015 of notary Jose Dima Satria, S.H.
Dima Satria, S.H. M.Kn. M.Kn.
Anggaran Dasar Perusahaan telah beberapa kali The Company's Articles of Association has been
mengalami perubahan berdasarkan akta No. 67 amended several times based on Notarial Deed No.
tanggal 30 Juni 2022 oleh Lestiani Wang, S.H., 67 dated June 30,2022 by Lestiani Wang, S.H. M.Kn.,
M.Kn., WTR melepas saham di PT CCT kepada PT WTR sold its ownership in shares at PT CCT to
Sarana Multi Infrastruktur dengan harga sebesar PT Sarana Multi Infrastruktur amounting to
Rp44.000.000.000 atau setara dengan 44.000.000 Rp44,000,000,000 or equivalent to 44,000,000
lembar saham. Kepemilikan saham WTR di PT CCT shares. WTR's share ownership in PT CCT was
menjadi sebesar 35% dari modal yang disetor. Grup reduced to 35%. The Group recognized a gain on
mengakui keuntungan dari penjualan Sebagian PT partial disposal of PT CCT amounting to
CCT sebesar Rp76.602.456.099 sebagai Rp76,602,456,099 which is included on other income
pendapatan (beban) lain-lain - bersih. (expense) - net.
PT Hotel Karya Indonesia (HKI) PT Hotel Karya Indonesia (HKI)
Pendirian PT HKI adalah sesuai dengan akta notaris The establishment of PT HKI was in accordance
No. 10 Cintya Ayu Rashanty, S.H., M.Kn., tanggal 29 with notarial deed No. 10 of Cintya Ayu Rashanty,
Oktober 2018. Akta ini telah mendapat pengesahan S.H., M.Kn., dated October 29, 2018. This deed has
Menteri Hukum dan Hak Asasi Manusia dalam surat been approved by the Minister of Law and Human
keputusan No. AHU-0053574.AH.01.01 Tahun 2018 Rights in his decree No. AHU-0053574.AH.01.01
tanggal 9 November 2018 2018 dated November 9, 2018.
Berdasarkan akta notaris Cintya Ayu Rishanty, S.H., Based on notarial deed No. 15 of Cintya Ayu
M.Kn., No. 15 tanggal 28 Januari 2019, WKR memiliki Rishanty, S.H., dated January 28, 2019, WKR
penyertaan di HKI sebesar Rp15.525.000.000, Akta has investment in HKI amounting to
ini telah mendapat pengesahan Menteri Hukum dan Rp15,525,000,000. This deed has been approved
Hak Asasi Manusia sesuai dengan Surat Keputusan by the Minister of Law and Human Rights based
No. AHU-0017985.AH.01.11.Tahun 2019 tanggal on decree No. AHU-0017985.AH.01.11.Tahun
4 Februari 2019. 2019 dated February 4, 2019.
PT Waskita Bali Mandara (WBM) PT Waskita Bali Mandara (WBM)
WTR, entitas anak, memiliki penyertaan sebesar WTR, a subsidiary, has 60% ownershipin
60% pada WBM. WBM didirikan sesuai Akta WBM. WBM was established under the Deed of
Pendirian No. 6 tanggal 13 November 2015 dari Establishment No. 6 dated November 13, 2015 of
Notaris Jose Dima Satria, S.H., M.Kn. WBM belum Notary Jose Dima Satria, S.H., M.Kn. WBM has
memiliki hak pengusahaan jalan tol. no toll road concession right.
Manajemen berpendapat bahwa tidak terdapat Management believes there is no impairment on
penurunan nilai atas investasi pada entitas asosiasi. investment in associates.
Jumlah aset, liabilitas, pendapatan, dan laba/ rugi Total assets, liabilities, revenues and income/ loss of
entitas asosiasi adalah sebagai berikut: associates are as follows:
31 Maret / March 31, 2024
Aset/ Liabilitas/ Pendapatan/ Laba (Rugi)/
Assets Liabilities Revenue Profit (Loss)
Rp Rp Rp Rp
PT Waskita Bali Mandara 4.146.537.660 1.000.000 -- 58.317.893
PT Cimanggis Cibitung Tollways 11.503.579.706.679 9.304.784.547.066 1.778.734.933.155 (139.305.559.447)
PT Hotel Karya Indonesia 58.543.299.988 4.356.874.177 -- 177.736.100
- 89 -
Page 87
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Desember / December 31, 2023
Aset/ Liabilitas/ Pendapatan/ Laba (Rugi)/
Assets Liabilities Revenue Profit (Loss)
Rp Rp Rp Rp
PT Waskita Bali Mandara 4.146.537.660 1.000.000 -- 58.317.893
PT Cimanggis Cibitung Tollways 11.503.579.706.679 9.304.784.547.066 1.778.734.933.155 (139.305.559.447)
PT Hotel Karya Indonesia 58.543.299.988 4.356.874.177 -- 177.736.100
Investasi pada Ventura Bersama Investment in Joint Ventures
Rincian saldo investasi ventura bersama adalah Details of investments in joint ventures are as follows:
sebagai berikut:
31 Maret / March 31, 2024
Setoran (Penarikan)/ Pengakuan Laba
Koreksi/ Placement (Rugi)/
Persentase/ Saldo Awal/ (Withdrawal)/ Gain (Loss) Saldo Akhir/
Percentage Beginning Balance Correction Recognition Ending Balance
Proyek/ Project % Rp Rp Rp Rp
Pihak Berelasi/ Related Parties
WTR - SMI Jalan Tol Bogor-Ciawi-Sukabumi 65% -- 1.514.824.920.388 (18.384.783.760) 1.496.440.136.628
WKR - RNI RNI Office Park 96% 266.702.479.986 -- 8.294.791 266.710.774.777
Waskita - NK Jalan Batu Aji Kuaro 60% 38.473.287.580 -- -- 38.473.287.580
Waskita - Nindya - Permata Jalan Feeder IKN 50% 17.028.305.864 (5.000.000.000) 20.837.741.769 32.866.047.633
Waskita - Wika Jalan Tol Ciawi Sukabumi seksi 1 51% 17.964.836.939 -- -- 17.964.836.939
Waskita - Nindya Kantor Kementerian Koordinator 3 51% 11.944.295.206 -- 4.418.273.443 16.362.568.649
Waskita - Adhi Bendungan Margatiga 65% 14.691.719.147 -- 58.317.637 14.750.036.784
Waskita - Wika - PP - HK Jatigede Sumedang 25% 7.448.173.986 -- -- 7.448.173.986
Waskita - HK Sal Induk Sidorejo 51% 7.348.709.249 -- -- 7.348.709.249
Wika - Waskita - Nindya Soker MYC 31% 5.201.594.252 -- -- 5.201.594.252
Waskita - PP - Wika Jembatan Merah Putih 34% 4.183.348.157 -- -- 4.183.348.157
Waskita - Abipraya Stadion Kanjuruhan Malang 60% 820.770.610 -- 3.172.052.516 3.992.823.126
Waskita - PP Kamijoro 51% 3.469.442.433 -- -- 3.469.442.433
Waskita - Nindya - LRS LRT Jakarta 50% 2.191.250.449 (7.358.939.368) 7.731.987.672 2.564.298.753
Brantas - Waskita Bendungan Tapin 49% 2.317.496.645 -- -- 2.317.496.645
Waskita - Adhi Bendungan Way Sekampung (Paket 2) 63% 2.235.148.980 -- 12.532.081 2.247.681.061
Waskita - Amarta Medan Islamic Center 70% 1.898.130.795 -- 42.967.203 1.941.097.998
Waskita - PP Jalan Kretek - Girijati 53% 1.601.608.282 (2.286.102.133) 1.970.367.537 1.285.873.686
Waskita - Adhi Pengaman Pantai Jakarta Tahap 2 Paket 1 60% 1.198.606.264 -- -- 1.198.606.264
Waskita - PP Rehabilitasi dan Renovasi Stadion Jawa Timur 51% -- -- 1.014.898.871 1.014.898.871
Waskita - Adhi Bendungan Leuwi Keris Paket 2 70% 2.007.077 -- -- 2.007.077
Kresna Kusuma Dyandra Marga Jalan Tol Bekasi Cawang Kampung Melayu 76% -- 100.607.111.800 (100.607.111.800) --
Sub Jumlah/ Sub Total 406.721.211.901 1.600.786.990.687 (79.724.462.040) 1.927.783.740.548
Pihak Ketiga/ Third Parties
WKR - Darmo Permai Segi 88 Avenue 51% 300.407.440.770 -- 479.241.497 300.886.682.267
Waskita - Acset Jalanlayang Cikampek 51% 285.320.773.721 -- 1.500.016 285.322.273.737
Waskita - Triniti Alam Sutra 51% 166.315.135.609 -- 27.945.174 166.343.080.783
WKR - Sirius Yukata Suites 51% 127.456.204.586 -- 259.701.754 127.715.906.340
Waskita - Bahagia Bangun Nusa Bendungan Temef (Paket 1) 78% 119.549.938.350 -- -- 119.549.938.350
Metallurgical - Wika - NK - Waskita Jl Tol Cisumdawu Phase 2 8% 97.864.492.151 -- 46.672.873 97.911.165.024
Waskita - Gorip Nanda Guna Jl. Gempor Paket 2 Porong-Kejapan 60% 94.269.521.263 -- -- 94.269.521.263
Waskita - Guntur Tol IKN Tempadung-Pulau Balang 50% 85.398.387.741 -- (15.425.390.476) 69.972.997.265
Dalawa - WKR Zallaka - Batu Tumpeng 41% 65.390.707.789 -- -- 65.390.707.789
Waskita - Abdi Mulia Berkah Sal Primer Jabung II 70% 63.309.602.430 -- -- 63.309.602.430
Waskita - JPC SMM Muara Teweh Div.Sipil 68% 53.230.724.936 -- -- 53.230.724.936
Daelim - Wika - Waskita Karian Multipurpose Dam Project 22% 49.824.407.003 -- (1.315.555.088) 48.508.851.915
WKR - Permata Hijau WKR - Permata Hijau 51% 42.929.358.014 -- -- 42.929.358.014
Waskita - Yasa Jl. Galing Aruk 100% 38.918.539.425 -- -- 38.918.539.425
Waskita - Adhi - Jaya Bayung Lencir - Tempino Seksi 1 40% 45.393.883.049 (11.999.997.100) 4.426.081.540 37.819.967.489
Waskita - Bawakaraeng Irigasi D.I. Batang Alai 70% 29.947.164.581 -- -- 29.947.164.581
Waskita - Jakon - Sagna Bendungan Tiga Dihaji 57% 28.401.677.509 -- 633.758.645 29.035.436.154
Waskita - Sumber Pelabuhan SKPT Morotai 70% 1.106.934.384 -- 21.284.440.223 22.391.374.607
Waskita - Nindya - Modern Jalan IKN Sepaku Segmen 4 70% 16.601.283.937 (2.423.399.737) (3.120.486.575) 11.057.397.625
Waskita - BRP Sedimentasi Bendungan Sumbawa 65% 9.824.991.426 -- 8.644.063 9.833.635.489
Nindya - WSKT - Bina Nusa Lestari Pematangan Lahan KITB 40% 5.418.112.136 -- 3.296.195.701 8.714.307.837
Waskita - Bersinar Pembangunan IPAL 1,2,3 IKN 70% -- -- 8.503.454.815 8.503.454.815
Waskita - Wika - PP - Jaya Gd. Terminal 3 45% 8.477.877.216 -- -- 8.477.877.216
Waskita - Kelman Infrapratama Proyek SPAM Jatiluhur (pd.Kopi) 70% 4.675.137.541 (3.150.000.000) 6.878.443.422 8.403.580.963
Waskita - KMP Rekonstruksi Jalan Kwatisore - Kamp Muri 70% 8.031.012.724 -- (492.077.108) 7.538.935.616
Waskita - Matra Pembangunan PJUTS Wilayah 4 90% 3.347.860.694 -- 3.664.069.991 7.011.930.685
Waskita - Wika - Shanghai Jl Tol Cisumdawu Phase 1 10% 5.631.984.243 -- -- 5.631.984.243
PP - WSKT - YASA Jalan Feeder IKN 6C 33% 172.316.268 -- 5.180.726.476 5.353.042.744
Waskita - BRP JI Mrican Paket 2 70% 6.053.109.319 (3.740.410.922) 2.767.140.590 5.079.838.987
Waskita - Pijar Double Track Manggarai 65% 3.748.869.642 -- (711.665.311) 3.037.204.331
Waskita - Riki Kencana FO Sekip Ujung 65% 4.651.391.431 -- (1.643.719.276) 3.007.672.155
Waskita - Bahagia - Guntur Pembangunan Bendungan Temef 65% 2.692.056.325 -- 271.812.083 2.963.868.408
Waskita - Adhi - As Bendungan Rukoh Paket 2 58% -- -- 2.506.139.199 2.506.139.199
Nindya - WSKT - Naviri - Panca Jl Akses Bandara VVIP IKN 35% -- -- 2.064.875.244 2.064.875.244
Toa - Waskita - Wakachiku - HK - Abipraya Patimban Port Development 16% 12.161.798.697 (10.140.299.470) -- 2.021.499.227
Waskita - Arkonin Revitalisasi TPA Regional Sarbagita Suwing (MYC) 92% 1.730.920.261 -- -- 1.730.920.261
PP - Adhi - Wskt - MWT Proyek Serang Panimban Seksi 3 28% -- 554.212.313 615.356.444 1.169.568.757
WIKA - WSKT - Jaya Konstruksi Manggala- PP Jalan Tol IKN Seksi 3B-2 ; Segmen KKT Kariangau 20% -- -- 1.027.015.570 1.027.015.570
Waskita - Citra Mandiri Jaringan Irigasi D.I Air Lakitan 70% 1.006.945.967 -- -- 1.006.945.967
PP - WSKT - Sarana Proyek Jln. Bululawang - Tambakrejo JOI 40% 271.460.732 (1.160.817.864) 1.873.240.868 983.883.736
Waskita - Rinenggo - Antaraksa Proyek Bangunan Stasiun Medan 40% -- -- 718.969.935 718.969.935
Waskita - Bangkit - Infra Bendungan Karangnongko Paket II 55% -- -- 718.076.129 718.076.129
WKI - BBM Pekerjaan Clearing, Cut & Fill Tanah 45% -- 341.637.905 -- 341.637.905
Waskita - Cempaka Bendung Baliase 55% 341.026.402 -- -- 341.026.402
Waskita - Gala Karya JDU SPAM Regional Durolis 70% 320.998.998 -- -- 320.998.998
WKR - Ekatama Apartemen Pejaten 60% 291.033.379 -- -- 291.033.379
Waskita - Taruna Putra Pertiwi Jaringan Irigasi D.I Colo (MYC) 70% 131.537.905 -- -- 131.537.905
Waskita - Surya Bakti Jalan Pendekat Mahakam IV Sisi Samarinda Kota 60% 119.208.279 -- -- 119.208.279
Waskita-BK-BBP-KPR Pembangunan Bendungan Cibeet 58% -- -- 12.466.120 12.466.120
Waskita - Amarta Gedung GIK UGM 65% 4.283.134.270 (4.743.360.914) 460.226.644 --
Waskita - PAL PLTU 2X3 MW Malinau 100% -- 729.990.540 (729.990.540) --
WSKT - BRAP Patimban Akses toll road 60% -- 2.699.111.705 (2.699.111.705) --
WSKT - BRAP Irigasi Belitang Lempuing Pkt 2 60% -- 1.562.036.675 (1.562.036.675) --
WSKT - BRAP Irigasi Belitang Lempuing Pkt 3 60% -- 197.104.096 (197.104.096) --
Waskita - Andesmont Bangunan Pengarah Bendungan Rukoh 70% -- 1.322.873.734 (1.322.873.734) --
--
Sub Jumlah/ Sub Total 1.795.018.961.103 (29.951.319.039) 38.506.184.432 1.803.573.826.496
Jumlah/ Total 2.201.740.173.004 1.570.835.671.648 (41.218.277.608) 3.731.357.567.044
- 90 -
Page 88
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Desember / December 31, 2023
Setoran (Penarikan)/ Pengakuan Laba
Koreksi/ Placement (Rugi)/
Persentase/ Saldo Awal/ (Withdrawal)/ Gain (Loss) Saldo Akhir/
Percentage Beginning Balance Correction Recognition Ending Balance
Proyek/ Project % Rp Rp Rp Rp
Pihak Berelasi/ Related Parties
WKR - RNI RNI Office Park 96% 266.562.767.380 -- 139.712.606 266.702.479.986
Waskita - NK Jalan Batu Aji Kuaro 60% 38.473.287.580 -- -- 38.473.287.580
Waskita - Wika Jalan Tol Ciawi Sukabumi seksi 1 51% 17.964.836.939 -- -- 17.964.836.939
Waskita - Adhi Bendungan Margatiga 65% 16.635.139.914 (3.250.000.000) 1.306.579.233 14.691.719.147
Waskita - Nindya - Permata Jalan Feeder IKN 50% -- -- 17.028.305.864 17.028.305.864
Waskita - Nindya Kantor Kementerian Koordinator 3 51% -- -- 11.944.295.206 11.944.295.206
Waskita - Wika - PP - HK Jatigede Sumedang 25% 7.448.173.986 -- -- 7.448.173.986
Waskita - HK Sal Induk Sidorejo 51% 7.348.709.249 -- -- 7.348.709.249
Wika - Waskita - Nindya Soker MYC 31% 5.215.697.790 (14.103.538) -- 5.201.594.252
Waskita - PP - Wika Jembatan Merah Putih 34% 4.182.650.808 -- 697.349 4.183.348.157
Waskita - PP Kamijoro 51% 5.678.543.341 (2.209.100.908) -- 3.469.442.433
Brantas - Waskita Bendungan Tapin 49% 66.645.493.877 (64.327.997.232) -- 2.317.496.645
Waskita - Adhi Bendungan Way Sekampung (Paket 2) 63% 1.262.699.663 (135.798.542) 1.108.247.859 2.235.148.980
Waskita - Nindya - LRS LRT Jakarta 50% -- 7.358.939.368 (5.167.688.919) 2.191.250.449
Waskita - Amarta Medan Islamic Center 70% -- -- 1.898.130.795 1.898.130.795
Waskita - PP Jalan Kretek - Girijati 53% -- -- 1.601.608.282 1.601.608.282
Waskita - Adhi Pengaman Pantai Jakarta Tahap 2 Paket 1 60% 1.198.606.264 -- -- 1.198.606.264
Waskita - Abipraya Stadion Kanjuruhan Malang 60% -- -- 820.770.610 820.770.610
Waskita - Adhi Bendungan Leuwi Keris Paket 2 70% 2.596.649.439 (2.594.642.362) -- 2.007.077
Waskita - Wika Irigasi Batang Sinamar 60% 1.691.371.060 (1.691.371.060) -- --
Waskita - Yodya Karya Bandara Husein 99% 7.849.919.710 (7.849.919.710) -- --
Wika - Waskita RSUD Pasar Minggu 40% 271.701.933 (271.701.933) -- --
Kresna Kusuma Dyandra Marga Jalan Tol Bekasi Cawang Kampung Melayu 76% 271.729.357.786 211.738.763.369 (483.468.121.155) --
Waskita - PP KSO Rehabilitasi dan Renovasi Stadion Jawa Timur 51% -- 438.679.387 (438.679.387) --
Sub Jumlah/ Sub Total 722.755.606.719 137.191.746.839 (453.226.141.657) 406.721.211.901
Pihak Ketiga/ Third Parties
WKR - Darmo Permai Segi 88 Avenue 51% 297.078.554.244 -- 3.328.886.526 300.407.440.770
Waskita - Acset Jalanlayang Cikampek 51% 285.235.466.002 -- 85.307.719 285.320.773.721
Waskita - Triniti Alam Sutra 51% 166.030.020.301 -- 285.115.308 166.315.135.609
WKR - Sirius Yukata Suites 51% 127.775.368.668 -- (319.164.082) 127.456.204.586
Waskita - Bahagia Bangun Nusa Bendungan Temef (Paket 1) 78% 119.554.911.418 (4.973.068) -- 119.549.938.350
Metallurgical - Wika - NK - Waskita Jl Tol Cisumdawu Phase 2 8% 109.581.243.263 1.965.713.887 (13.682.464.999) 97.864.492.151
Waskita - Gorip Nanda Guna Jl. Gempor Paket 2 Porong-Kejapan 60% 94.269.521.263 -- -- 94.269.521.263
Waskita - Guntur Tol IKN Tempadung-Pulau Balang 50% 1.488.791.675 (49.933.987.985) 133.843.584.051 85.398.387.741
Dalawa - WKR Zallaka - Batu Tumpeng 41% 65.390.707.789 -- -- 65.390.707.789
Waskita - Abdi Mulia Berkah Sal Primer Jabung II 70% 33.808.507.543 29.501.094.887 -- 63.309.602.430
Waskita - JPC SMM Muara Teweh Div.Sipil 68% 53.230.724.936 -- -- 53.230.724.936
Daelim - Wika - Waskita Karian Multipurpose Dam Project 22% 40.296.040.231 -- 9.528.366.772 49.824.407.003
Waskita - Adhi - Jaya Bayung Lencir - Tempino Seksi 1 40% -- -- 45.393.883.049 45.393.883.049
WKR - Permata Hijau WKR - Permata Hijau 51% 42.926.919.852 -- 2.438.162 42.929.358.014
Waskita - Yasa Jl. Galing Aruk 100% 38.918.539.425 -- -- 38.918.539.425
Waskita - Bawakaraeng Irigasi D.I. Batang Alai 70% 29.947.164.581 -- -- 29.947.164.581
Waskita - Jakon - Sagna Bendungan Tiga Dihaji 57% 26.200.114.917 -- 2.201.562.592 28.401.677.509
Waskita - Nindya - Modern Jalan IKN Sepaku Segmen 4 70% -- -- 16.601.283.937 16.601.283.937
Toa - Waskita - Wakachiku - HK - Abipraya Patimban Port Development 16% -- 10.140.299.470 2.021.499.227 12.161.798.697
Waskita - BRP Sedimentasi Bendungan Sumbawa 65% 18.228.928.625 (18.671.882.037) 10.267.944.838 9.824.991.426
Waskita - Wika - PP - Jaya Gd. Terminal 3 45% 8.477.877.216 -- -- 8.477.877.216
Waskita - KMP Rekonstruksi Jalan Kwatisore - Kamp Muri 70% 972.834.968 -- 7.058.177.756 8.031.012.724
Waskita - BRP, KSO JI Mrican Paket 2 70% -- (1.480.697.783) 7.533.807.102 6.053.109.319
Waskita - Wika - Shanghai Jl Tol Cisumdawu Phase 1 10% 6.476.285.760 (844.301.517) -- 5.631.984.243
Nindya - WSKT - Bina Nusa Lestari Pematangan Lahan KITB 40% -- -- 5.418.112.136 5.418.112.136
Waskita - Kelman Infrapratama, KSO Proyek SPAM Jatiluhur (pd.Kopi) 70% -- -- 4.675.137.541 4.675.137.541
Waskita - Riki Kencana FO Sekip Ujung 65% 9.455.741.654 -- (4.804.350.223) 4.651.391.431
Waskita - Amarta Gedung GIK UGM 65% 35.665.116 -- 4.247.469.154 4.283.134.270
Waskita - Pijar Double Track Manggarai 65% 5.211.844.294 -- (1.462.974.652) 3.748.869.642
Waskita - Matra Pembangunan PJUTS Wilayah 4 90% -- -- 3.347.860.694 3.347.860.694
Waskita - Bahagia - Guntur, KSO Pembangunan Bendungan Temef (JOI 65%) 65% -- -- 2.692.056.325 2.692.056.325
Waskita - Arkonin Revitalisasi TPA Regional Sarbagita Suwing (MYC) 92% 32.553.342.664 (30.822.422.403) -- 1.730.920.261
Waskita - Sumber Pelabuhan SKPT Morotai 70% -- -- 1.106.934.384 1.106.934.384
Waskita - Citra Mandiri Jaringan Irigasi D.I Air Lakitan 70% 30.368.509.867 (29.361.563.900) -- 1.006.945.967
Waskita - Cempaka Bendung Baliase 55% 341.026.402 -- -- 341.026.402
Waskita - Gala Karya JDU SPAM Regional Durolis 70% 15.252.926.255 (14.931.927.257) -- 320.998.998
WKR - Ekatama Apartemen Pejaten 60% 291.033.379 -- -- 291.033.379
PP - WSKT - Sarana KSO Proyek Jln. Bululawang - Tambakrejo JOI (40%) 40% -- -- 271.460.732 271.460.732
PP - WSKT - YASA KSO Jalan Feeder IKN 6C 33% -- -- 172.316.268 172.316.268
Waskita - Taruna Putra Pertiwi Jaringan Irigasi D.I Colo (MYC) 70% 15.245.087.088 (15.113.549.183) -- 131.537.905
Waskita - Surya Bakti Jalan Pendekat Mahakam IV Sisi Samarinda Kota 60% 119.208.279 -- -- 119.208.279
WKI - BBM Pekerjaan Clearing, Cut & Fill Tanah 45% -- (160.966.080) 160.966.080 --
Waskita - Rinenggo - Antaraksa Proyek Bangunan Stasiun Medan 40% -- 4.336.447.852 (4.336.447.852) --
Waskita-BK-BBP-KPR Pembangunan Bendungan Cibeet 58% -- 25.099.703 (25.099.703) --
Waskita - Penta Lansekap Bandara Soetta 98% 15.893.747.018 (15.893.747.018) -- --
Waskita - Bersinar Pembangunan IPAL 1,2,3 IKN 70% -- 9.180.044.544 (9.180.044.544) --
KSO WKR - Vision First JPM Dukuh Atas 92% 25.107.814.975 (25.107.814.975) -- --
Waskita - PAL PLTU 2X3 MW Malinau 100% -- 3.874.062.672 (3.874.062.672) --
Waskita - Bangkit - Infra Bendungan Karangnongko Paket II 55% -- 871.635.647 (871.635.647) --
Sub Jumlah/ Sub Total 1.715.764.469.668 (142.433.434.544) 221.687.925.979 1.795.018.961.103
Jumlah/ Total 2.438.520.076.387 (5.241.687.705) (231.538.215.678) 2.201.740.173.004
PT Trans Jabar Tol (TJT) - (WTR - SMI) PT Trans Jabar Tol (TJT) - (WTR - SMI)
Pendirian TJT (kepemilikan tidak langsung melalui The establishment of TJT (indirect ownership through
WTR) adalah sesuai dengan akta notaris No. 79 WTR) was based on notarial deed No. 79 dated July
tanggal 19 Juli 2007 dari notaris Humberg Lie, S.H., 19, 2007 of notary Humberg Lie, S.H., M.Kn. This
- 91 -
Page 89
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
M.Kn. Akta pendirian ini telah mendapat persetujuan notarial deed has been approved by
oleh Menteri Hukum dan Hak Asasi Manusia melalui the Minister of Law and Human Rights through
surat keputusan No. W29-01398-HT.01.01- TH.2007. the decision letter No. W29-01398-HT.01.01-
TH.2007.
Akuisisi TJT oleh WTR sesuai dengan akta notaris Acquisition of TJT by WTR was in accordance with
Jose Dima Satria, S.H., M.Kn No. 44 tanggal 22 the deed of notary Jose Dima Satria, S.H., M.Kn
Desember 2015. Akta ini telah mendapat persetujuan No. 44 dated December 22, 2015. This deed was
oleh Menteri Hukum dan Hak Asasi Manusia approved by the Minister of Law and Human Rights
melalui surat No. AHU-AH.01.03-0990894. through the decision letter No. AHU-AH.01.03-
0990894.
Anggaran Dasar TJT telah beberapa kali mengalami TJT's Articles of Association has been amended
perubahan, terakhir berdasarkan Keputusan sirkuler several times, most recently based on the circular
para pemegang saham sebagai pengganti dari Rapat decision of the shareholders in lieu of
Umum Pemegang Saham Luar Biasa PT TJT yang the Extraordinary General Meeting of Shareholders of
diaktakan melalui Akta Notaris No. 05 tanggal 16 PT TJT which was notarized through Notarial Deed
Oktober 2023 yang dibuat dihadapan Catur Virgo, No. 05 dated October 16, 2023 which was made in
SH., MH. Notaris di Jakarta. Bahwa WTR selaku the presence of Catur Virgo, SH., MH. Notary in
pemegang saham mayoritas menyetujui rencana Jakarta. That WTR as the majority shareholder has
penggunaan dan peningkatan modal ditempatkan approved the plan to use and increase issued and
dan disetor sebesar Rp132.933.500.000 untuk modal paid-up capital amounting to Rp132,933,500,000 for
kerja konstruksi, investasi pembangunan, dan retensi construction working capital, development nvestment
ruas tol serta pemenuhan CDS. Akta ini telah and retention of toll roads as well as CDS fulfillment.
mendapat persetujuan oleh Menteri Hukum dan Hak This deed has been approved by the Minister of Law
Asasi Manusia Republik Indonesia melalui surat and Human Rights of the Republic of Indonesia
No. AHU-AH.01.03-0129749 tanggal through letter No. AHU-AH.01.03-0129749 dated
17 Oktober 2023. October 17, 2023.
Berdasarkan Akta Jual Beli Nomor 26 tanggal 25 Based on the Sale and Purchase Deed Number 26
Januari 2024 antara PT Waskita Toll Road dengan dated January 25, 2024, between PT Waskita Toll
PT Sarana Multi Infrastruktur telah terjadi transaksi Road and PT Sarana Multi Infrastruktur, there has
jual beli kepemilikan saham WTR di TJT kepada SMI. been a sale and purchase transaction of WTR share
WTR menjual dan menyerahkan kepada SMI ownership in TJT to SMI. WTR sold and handed over
kepemilikan saham di TJT dengan harga total to SMI its share ownership in TJT for a total price of
sebesar Rp755.330.988.463,- atau sebesar Rp755,330,988,463,- or 1,235,922 shares. Based on
1.235.922 lembar saham. Berdasarkan transaksi this transaction, SMI became a shareholder in TJT
tersebut SMI menjadi salah satu pemegang saham di with a percentage of 25%, while WTR's ownership in
TJT dengan prosentase sebesar 25%, sedangkan TJT became 74.99% and the remaining 0.01% was
kepemilikan WTR di TJT menjadi 74,99% dan owned by the Koperasi Waskita.
sisanya sebesar 0,01% dimiliki oleh Koperasi
Waskita.
Berdasarkan Berita Acara Pemenuhan dan/atau Based on the Minutes of Fulfillment and/or Waiver of
Pengesampingan Persyaratan Pendahuluan yang Preliminary Requirements which were signed by both
telah ditandatangani kedua belah pihak antara WTR parties between WTR and SMI on January 24 2024,
dengan SMI tanggal 24 Januari 2024, Bagian III: Part III: Preliminary Requirements of the Parties Point
Persyaratan Pendahuluan Para Pihak Poin 1.(ii) 1.(ii) that after the transaction between WTR and SMI
bahwa setelah terjadinya transaksi antara WTR dan occurs, in carrying out operations TJT is carried out
SMI maka dalam menjalankan operasional TJT under the provisions of Joint Control.
dilakukan dengan ketentuan Joint Control
(Pengendalian Bersama).
PT Kresna Kusuma Dyandra Marga (KKDM) - PT Kresna Kusuma Dyandra Marga (KKDM) -
(WTR - RDPT) (WTR - RDPT)
Pendirian KKDM (kepemilikan tidak langsung melalui The estabilishment of KKDM (indirect ownership
WTR) adalah sesuai Akta Pendirian dari Notaris through WTR) was based on notarial deed
Mudofir Hadi S.H, No. 94 tanggal 20 Desember 1996. No. 94 dated December 20, 1996 of notary Mudofir
WTR memiliki penyertaan 60% dari modal disetor Hadi, S.H. WTR owns 60% of paid up capital of
KKDM. KKDM.
- 92 -
Page 90
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Berdasarkan akta notaris tanggal 8 Juni 2017 dari Based on notarial deed No. 25 dated June 8, 2017
notaris Jose Dima Satria, S.H., M.Kn. No. 25, WTR of notary Jose Dima Satria, S.H., M.Kn., WTR
membeli kepemilikan minoritas pada saham KKDM purchased a minority interest in KKDM amounting
senilai Rp525.000.000.000 atau setara dengan to Rp525,000,000,000or equivalent to 38.97%,
38,97%, sehingga kepemilikan WTR menjadi bringing the ownership of WTR to 98.97%.
98,97%.
Berdasarkan akta notaris No. 17 Based on notarial deed No. 17 dated
tanggal 20 Desember 2017 dari notaris Ariani December 20, 2017 by notary Ariani L. Rachim, S.H.,
L. Rachim, S.H., WTR membeli penerbitan saham WTR bought 0.57% of KKDM shares bringing WTR’s
KKDM sebesar 0,57% sehingga kepemilikan WTR ownership in KKDM to 99.54%.
atas KKDM menjadi 99,54%.
Berdasarkan akta notaris No. 3 tanggal 9 Februari Based on notarial deed No. 3 dated February 9,
2018 dari notaris Ariani L. Rachim, S.H., perihal 2018 of notary Ariani L. Rachim, S.H., regarding
Keputusan Sirkular Rapat Umum Pemegang Saham the Circular Resolution of General Meeting of
(RUPS) tanggal 24 Januari 2018, WTR menambah Shareholders (GMS) dated January 24, 2018,
penyertaan pada KKDM sebesar Rp73.476.879.000. WTR increased its ownership in KKDM amounting
to Rp73,476,879,000.
Berdasarkan akta notaris No. 4 tanggal 5 Juni 2018 Based on notarial deed No. 4 dated June 5, 2018
dari notaris Ariani L. Rachim, S.H., WTR menambah of notary Ariani L. Rachim, S.H., WTR increased
penyertaan pada KKDM sebesar Rp49.124.000.000, its ownership in KKDM amounting to
sehingga kepemilikan WTR menjadi 99,64%, yang Rp49,124,000,000, bringing the ownership of
telah disetujui oleh Menteri Hukum dan WTR to 99.64%, which has been approved by
Hak Asasi Manusia dengan Surat Keputusan the Minister of Law and Human Rights through
No. AHU-AH.01.03-0216005 tanggal 26 Juni 2018. Decision Letter No. AHU-AH.01.03-0216005 dated
June 26, 2018.
Berdasarkan Akta Notaris No. 40 tanggal 11 Oktober Based on Notarial Deed No. 40 dated October 11,
2018 dari Notaris Ariani L. Rachim, S.H., Perusahaan 2018 of Notary Ariani L. Rachim, S.H.,
menambah penyertaan pada KKDM sebesar the Company increased its ownership in KKDM
Rp110.428.000.000, sehingga kepemilikan amounting to Rp110,428,000,000, bringing
Perusahaan menjadi 99,70%, yang telah disetujui the ownership of the Company to 99.70%, which has
oleh Menteri Hukum dan Hak Asasi Manusia dengan been approved by the Minister of Law and Human
Surat Keputusan No. AHU-AH.01.03-0254272 Rights in his Decision Letter No. AHU-AH.01.03-
tanggal 18 Oktober 2018. 0254272 dated October 18, 2018.
Berdasarkan Akta Notaris No. 37 Based on Notarial Deed No. 37
tanggal 18 November 2020 oleh Ir. Nanette Cahyanie dated November 18, 2020 by Ir. Nanette Cahyanie
Handari Adi Warsito, S.H., WTR menjual 30% Handari Adi Warsito, S.H., WTR sold its 30%
kepemilikan saham di KKDM kepada RDPT dengan ownershipKKDM to Limited Investment Fund
harga sebesar Rp550.000.000.000. Perusahaan (RDPT) at a price of Rp550,000,000,000.
mengakui keuntungan dari penjualan tersebut The Company’s gain on sale amounting to
sebesar Rp104.611.720.601 sebagai penghasilan Rp104,611,720,601 which was recorded as other
lainnya. Kepemilikan saham WTR di KKDM menjadi income. WTR share ownership in KKDM becomes
sebesar 70% setelah penjualan tersebut. 70% after the sale of shares transaction.
Pemegang saham sepakat bahwa pengelolaan Shareholders agree that the management of
KKDM dikelola secara bersama oleh RDPT dan WTR KKDM managed jointly by RDPT and WTR in
sesuai dengan Perubahan Pertama atas Perjanjian accordance with the First Amendment on
antar Pemegang Saham PT Kresna Kusuma the Agreement between the shareholders
Dyandra Marga tanggal 17 November 2020. of PT Kresna Kusuma Dyandra Marga on
Berdasarkan kesepakatan bahwa KKDM dikelola November 17, 2020. Based on the agreement that
bersama, maka WTR tidak melakukan konsolidasi KKDM is jointly managed, WTR does not
terhadap laporan keuangan KKDM. consolidate KKDM's financial statements.
Berdasarkan Akta Jual Beli Saham No. 39 dari Based on the Deed of Sale and Purchase of Shares
Notaris Insinyur Nanette Cahyanie Handari Adi No. 39 from Notary Engineer Nanette Cahyanie
Warsito tanggal 18 November 2021. Berdasarkan Handari Adi Warsito dated November 18, 2021.
Akta Jual beli saham tersebut, WTR memiliki opsi beli Based on the Deed of Sale and Purchase of shares,
atas saham KKDM yang dimiliki oleh Reksa Dana WTR has a purchase option on KKDM shares owned
Penyertaan Terbatas Ekuitas Danareksa Toll Road by the Danareksa Toll Road Equity Limited
- 93 -
Page 91
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
(RDPT EDTR). Pelaksanaan opsi beli tahun I Participation Mutual Fund (RDPT EDTR).
sebanyak 53.785.872 lembar saham atau 2,1% The exercise of the buy option in the first year was
saham kepemilikan RDPT EDTR dengan 53,785,872 shares or 2.1% of the shares owned by
Rp47.391.269.678. RDPT EDTR with a transaction value of
Rp47,391,269,678.
Berdasarkan Akta Jual Beli Saham No. 21 dari Based on the Deed of Sale and Purchase of Shares
Notaris Insinyur Nanette Cahyanie Handari Adi No. 21 from Notary Engineer Nanette Cahyanie
Warsito tanggal 17 November 2022. Berdasarkan Handari Adi Warsito dated November 17, 2022.
Akta Jual beli saham tersebut, WTR memiliki opsi beli Based on the Deed of Sale and Purchase of shares,
atas saham KKDM yang dimiliki oleh Reksa Dana WTR has a purchase option on KKDM shares owned
Penyertaan Terbatas Ekuitas Danareksa Toll Road by the Danareksa Toll Road Equity Limited
(RDPT EDTR). Pelaksanaan opsi beli tahun II Participation Mutual Fund (RDPT EDTR).
sebanyak 53.785.872 lembar saham atau 2,1% The exercise of the buy option in the first year was
saham kepemilikan RDPT EDTR dengan nilai 53,785,872 shares or 2.1% of the shares owned by
transaksi sebesar Rp52.872.587.893. RDPT EDTR with a transaction value of
Rp52,872,587,893.
Berdasarkan Akta Jual Beli Saham No. 22 dari Based on the Deed of Sale and Purchase of Shares
Notaris Insinyur Nanette Cahyanie Handari Adi No. 22 from Notary Engineer Nanette Cahyanie
Warsito tanggal 15 November 2023. Berdasarkan Handari Adi Warsito dated November 15, 2023.
Akta Jual beli saham tersebut, WTR memiliki opsi beli Based on the Deed of Sale and Purchase of shares,
atas saham KKDM yang dimiliki oleh Reksa Dana WTR has a purchase option on KKDM shares owned
Penyertaan Terbatas Ekuitas Danareksa Toll Road by the Danareksa Toll Road Equity Limited
(RDPT EDTR). Pelaksanaan opsi beli tahun III Participation Mutual Fund (RDPT EDTR).
sebanyak 53.785.872 lembar saham atau 2,1% The exercise of the buy option in the first year was
saham kepemilikan RDPT EDTR dengan nilai 53,785,872 shares or 2.1% of the shares owned by
transaksi sebesar Rp58.425.441.319. RDPT EDTR with a transaction value of
Rp58,425,441,319.
Tidak terdapat perubahan kepemilikan atau hak There has been no change in the Group’s ownership
suara Grup untuk tahun-tahun yang dilaporkan. or voting interests in these joint ventures for
the reported years.
Operasi bersama Joint Operation
Perusahaan mempunyai 15% bagian dalam The Company has a 15% share in the Consortium
Perjanjian Pembentukan Konsorsium dalam Rangka Agreement for the Construction of Multipurpose
Pelaksanaan Pekerjaan Pembangunan Terminal Port and Support Facilities at the Port of Kuala
Multipurpose dan Fasilitas Pendukung di Pelabuhan Tanjung in North Sumatera Province. The Company
Kuala Tanjung di Propinsi Sumatera Utara. is entitled to a proportionate share of
Perusahaan berhak atas proporsi bagian dari the income and bears a proportionate share of
penghasilan dan dikenakan proporsi bagian dari the joint operating expenses.
biaya operasi bersama
Perusahaan mempunyai bagian dalam perjanjian The Company have shares in the joint operation
pelaksanaan pekerjaan pembangunan Jalan Tol for the construction work of Jakarta Cikampek II
Jakarta Cikampek II Elevated ruas Cikunir s.d Toll Road Elevated Cikunir to West Karawang
Karawang Barat Sta. 9+500 - Sta. 28+480. Sta. 9 + 500 - Sta. 28 + 480.
16. PROPERTI INVESTASI 16. INVESTMENT PROPERTIES
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Harga Perolehan Acquisition Cost
Tanah 72.307.454.963 72.307.454.963 Land
Bangunan 219.315.019.119 219.315.019.119 Building
Jumlah Harga Perolehan 291.622.474.082 291.622.474.082 Total Acquisition Cost
Nilai Wajar Fair Value
Tanah 86.682.474.975 86.682.474.975 Land
Bangunan 230.857.959.538 230.857.959.538 Building
Total Nilai Wajar 317.540.434.513 317.540.434.513 Total Fair Value
Jumlah Properti Investasi 317.540.434.513 317.540.434.513 Total Investment Properties
- 94 -
Page 92
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Properti investasi merupakan proyek gedung Investment properties consist of office building and
perkantoran dan hotel Cawang, yang berlokasi di Cawang hotel project, located in Jalan MT Haryono
Jalan MT Haryono Cawang, dengan luas lahan Cawang, lying on a land area of 3,650 m2.
sebesar 3.650 m2.
Pada tanggal 31 Maret 2024 dan 31 Desember 2023 As of March 31, 2024 and 2023, the fair value of the
nilai wajar properti investasi sebesar investment properties amounting to
Rp317.540.434.513. Rp317,540,434,513.
17. INVESTASI JANGKA PANJANG LAINNYA 17. OTHER LONG TERM INVESTMENTS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
PT Citra Waspphutowa 328.859.297.616 328.859.297.616
PT Prima Multi Terminal 302.622.000.000 302.622.000.000
PT Citra Karya Jabar Tol 131.250.000.000 131.250.000.000
PT Hutama Marga Waskita 79.402.869.204 79.402.869.204
PT Jasamarga Jogja Bawen 13.500.000.000 13.500.000.000
PT PP Sinergi Banjaratma 12.684.923.000 12.684.923.000
PT Jasamarga Gedebage Cilacap 1.219.100.000 1.219.100.000
PT Jasamarga Probolinggo Banyuwangi 200.000.000 200.000.000
Jumlah/ Total 869.738.189.820 869.738.189.820
Rincian mutasi investasi jangka panjang lainnya The details of movement in other long-term
sebagai berikut: investments are as follows:
31 Maret/ March 31, 2024
Persentase
Kepemilikan/ Penambahan
Percentage of Saldo Awal/ (Pengurangan)/ Reklasifikasi/ Saldo Akhir/
Ownership Beginning Balance Addition (Deduction) Reclassification Ending Balance
% Rp Rp Rp Rp
PT Citra Waspphutowa 13,47 328.859.297.616 -- -- 328.859.297.616
PT Prima Multi Terminal 1,01 302.622.000.000 -- -- 302.622.000.000
PT Citra Karya Jabar Tol 5,63 131.250.000.000 -- -- 131.250.000.000
PT Hutama Marga Waskita 0,50 79.402.869.204 -- -- 79.402.869.204
PT Jasamarga Jogja Bawen 7,91 13.500.000.000 -- -- 13.500.000.000
PT PP Sinergi Banjaratma 6,21 12.684.923.000 -- -- 12.684.923.000
PT Jasamarga Gedebage Cilacap 20,00 1.219.100.000 -- -- 1.219.100.000
PT Jasamarga Probolinggo Banyuwangi 0,07 200.000.000 -- -- 200.000.000
Jumlah/ Total 869.738.189.820 -- -- 869.738.189.820
31 Desember/ December 31, 2023
Persentase
Kepemilikan/ Penambahan
Percentage of Saldo Awal/ (Pengurangan)/ Reklasifikasi/ Saldo Akhir/
Ownership Beginning Balance Addition (Deduction) Reclassification Ending Balance
% Rp Rp Rp Rp
PT Citra Waspphutowa 13,47 328.859.297.616 -- -- 328.859.297.616
PT Prima Multi Terminal 1,01 302.622.000.000 -- -- 302.622.000.000
PT Citra Karya Jabar Tol 5,63 131.250.000.000 -- -- 131.250.000.000
PT Hutama Marga Waskita 0,50 79.402.869.204 -- -- 79.402.869.204
PT Jasamarga Jogja Bawen 7,91 13.500.000.000 -- -- 13.500.000.000
PT PP Sinergi Banjaratma 6,21 12.684.923.000 -- -- 12.684.923.000
PT Jasamarga Gedebage Cilacap 20,00 1.219.100.000 -- -- 1.219.100.000
PT Jasamarga Probolinggo Banyuwangi 0,07 200.000.000 -- -- 200.000.000
Jumlah/ Total 869.738.189.820 -- -- 869.738.189.820
PT Citra Waspphutowa (CW) PT Citra Waspphutowa (CW)
WTR memiliki penyertaan sebesar 12,5% dari WTR has a participation of 12.5% of the paid-in
modal PT Citra Waspphutowa atau sebesar capital of PT Citra Waspphutowa amounting to
Rp125.000.000.000. PT Citra Waspphutowa didirikan Rp125,000,000,000. PT Citra Waspphutowa was
sesuai Akta Pendirian No. 10 dari Notaris Drs. established based on Notarial Deed No. 10 by Drs.
Soegeng Santosa, S.H., M.H., tanggal Soegeng Santosa, S.H., M.H., dated January 13,
13 Januari 2006, bergerak di bidang pengusahaan 2006 and is engaged in toll road actvities.
jalan tol.
- 95 -
Page 93
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pada tanggal 5 April 2017 sesuai dengan Akta No. 13 On April 5, 2017, based on Notarial Deed
dari Notaris Irma Devita Purnamasari, S.H., M.Kn., No. 13 by Irma Devita Purnamasari, S.H., M.Kn.,
WTR membeli saham PT Citra Waspphutowa yang WTR bought the shares of PT Citra Waspphutowa
dimiliki oleh PT Waskita Karya (Persero) Tbk sebesar owned by PT Waskita Karya (Persero) Tbk
Rp132.000.000.000 dengan disagio saham sebesar amounting to Rp132,000,000,000 with a share
Rp63.467.953.607 sehingga kepemilikan WTR disagio of Rp63,467,953,607. This increased
menjadi 25%. WTR’s participation to 25%.
WTR menambah penyertaan pada PT Citra WTR increased its investment in PT Citra
Waspphutowa berdasarkan Akta No. 95 dari Notaris Waspphutowa based on notarial deed No. 95 by
Justriany Koni S.H., tanggal 28 Mei 2019 pada Justriany Koni S.H dated May 28, 2019 amounting
sebesar Rp61.000.000.000. to Rp61,000,000,000.
WTR menambah penyertaan pada PT Citra WTR increased its investment in PT Citra
Waspphutowa berdasarkan Akta No. 04 dari Notaris Waspphutowa based on notarial deed No. 04 by
Dewantari Handayani S.H, MPA., tanggal Dewantari Handayani S.H, MPA dated
28 Februari 2020 sebesar Rp80.750.000.000. February 28, 2020 amounting to Rp80,750,000,000.
Berdasarkan Surat No. D/73.3/WTR-DU/1220 Based on letter No. D/73.3/WTR-DU/1220 dated
tanggal 8 Desember 2020, WTR tidak setuju atas December 8, 2020, WTR disagreed to additional
penambahan modal ditempatkan dan disetor PT Citra paid-in capital in PT Citra Washpphutowa amounting
Washpphutowa sebesar Rp793.000.0000.000, to Rp793,000,000,000, therefore WTR participation
sehingga kepemillikan WTR menjadi 18,2% dan pada became 18.2% and on December 31, 2020, this
tanggal 31 Desember 2020, entitas asosiasi ini associate was reclassified from investment in
direklasifikasi dari investasi entitas asosiasi menjadi associate to other long-term investment.
investasi jangka panjang lainnya.
Berdasarkan akta No. 24 tanggal 13 Oktober 2022 Based on deed No. 24 dated October 13, 2022 by
dari Notaris Herdimansyah Chaidirsyah, S.H., perihal Notary Herdimansyah Chaidirsyah, S.H., regarding
tambahan modal ditempatkan dan disetor PT Citra the additional issued and paid-up capital of
Waspphutowa. WTR tidak melakukan setoran modal PT Citra Waspphutowa, WTR did not make capital
kepada PT Citra Waspphutowa, sebagai akibat hal injections to PT Citra Waspphutowa, as a result of
tersebut kepemilikan saham WTR terdilusi menjadi this, WTR share ownership was diluted to 13.47%.
sebesar 13,47%.
PT Prima Multi Terminal (PMT) PT Prima Multi Terminal (PMT)
Perusahaan memiliki penyertaan sebesar 20% pada The Company has 20% investment in PMT or
PMT atau setara Rp26.100.000.000. Perusahaan ini equivalent to Rp26,100,000,000. PMT was
didirikan sesuai Akta Pendirian No. 4 tanggal established under Notarial deed of Establishment
26 September 2014 dari Notaris Tuti Sumarni, S.H., No. 4 dated September 26, 2014 of Notary Tuti
M.H., bergerak di bidang perdagangan dan jasa. Sumarni, S.H., M.H., and is engaged in trading and
services.
Berdasarkan Akta No. 6 tanggal 16 Desember 2015 Based on Notarial deed No. 6 dated December 16,
dari notaris Tuti Sumarni, S.H., M.H., 2015 of notary Tuti Sumarni, S.H., M.H.,
PT Pembangunan Perumahan Tbk melakukan PT Pembangunan Perumahan Tbk sold some of its
penjualan sebagian saham sebesar own shares in PMT amounting to
Rp9.150.000.000.yang dimiliki di dalam PMT atau Rp9,150,000,000.or equivalent to 5%.
sebanyak 5%.
Pada tanggal 14 Desember 2017, Perusahaan On December 14, 2017, the Company increased its
menambah penyertaan di PMT sebesar investment in PMT amounting to Rp60,000,000,000.
Rp60.000.000.000. Kepemilikan Perusahaan The Company’s ownership became 20% according to
menjadi sebesar 20%, berdasarkan akta notaris notarial deed No. 9 dated February 23, 2018 of notary
No. 9 tanggal 23 Februari 2018 dari notaris Risna Risna Rahmi Arifa, S.H.
Rahmi Arifa, S.H.
Pada Desember 2018, Perusahaan menambah In December 2018, the Company increased its
penyertaan di PMT sebesar Rp30.000.000.000. investments in PMT amounting to Rp30,000,000,000.
Kepemilikan Perusahaan menjadi sebesar 20%, The Company’s ownership became 20% according to
berdasarkan akta notaris Risna Rahmi Arifa, S.H. notarial deed of notary Risna Rahmi Arifa, S.H. The
Manajemen berpendapat penyertaan di PMT belum management has assessed that the ownership in
- 96 -
Page 94
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
memiliki pengaruh signifikan sampai dengan tanggal PMT does not have significant influence up
laporan. to reporting date.
Berdasarkan Akta No. 18 tanggal 24 Oktober 2022 Based on Notarial deed No. 18 dated October 24,
oleh notaris Nanda Fauzan Iwan, PMT meningkatkan 2022 by notary Nanda Fauzan Iwan, PMT increased
modal disetor dan ditempatkan yang seluruhnya the paid-in and issued capital which was entirely paid
diambil bagian oleh Pelindo dengan cara konversi up by Pelindo by converting a shareholder loan
pinjaman pemegang saham sebesar amounting to Rp466,878,000,000and paid-in capital
Rp466.878.000.000 dan penyetoran modal in cash amounting to Rp2,750,123,049,346.
tunai sebesar Rp2.750.123.049.346. Kepemilikan Company’s ownership in PMT became 1.01%.
Perusahaan di PMT menjadi 1,01%.
PT Citra Karya Jabar Tol (CKJT) PT Citra Karya Jabar Tol (CKJT)
WTR memiliki penyertaan sebesar 15% dari modal WTR has 15% investment in CKJT’s paid-in capital or
CKJT atau setara dengan Rp15.000.000.000. CKJT equivalent to Rp15,000,000,000. CKJT was
didirikan sesuai Akta Pendirian No. 18 tanggal 30 established based on the notarial deed No. 18 dated
Januari 2017 dari notaris Dessi, S.H., M.Kn., January 30, 2017 by notary Dessi, S.H., M.Kn. and
bergerak di bidang pengusahaan jalan tol. engaged in toll road concession.
WTR menambah penyertaan pada CKJT sebesar WTR increased its investment in CKJT amounting to
Rp30.000.000.000 pada tanggal 1 November 2018. Rp30,000,000,000 on November 1, 2018.
WTR menambah penyertaan pada CKJT sebesar WTR increased its investment in CKJT amounting to
Rp86.250.000.000 berdasarkan Keputusan Sirkuler Rp86,250,000,000 based on the decree of
di luar RUPS pada tanggal 13 September 2019. the Circular outside of GMS dated September 13,
2019.
Berdasarkan akta No. 47 oleh Notaris Herdimansyah Based on deed no. 47 by Notary Herdimansyah
Chaindirsyah, S.H. tanggal 21 Juli 2023, penyertaan Chaindirsyah, S.H. On July 21, 2023, WTR's
WTR pada CKJT menjadi 5,63% akibat peningkatan investment in CKJT became 5.63% due to an
modal disetor dan ditempatkan oleh pemegang increase in paid-in capital and placement by other
saham lain. shareholders.
PT PP Sinergi Banjaratma PT PP Sinergi Banjaratma
Perusahaan memiliki penyertaan sebesar 20% pada The Company has 20% investment in
PT PP Sinergi Banjaratma atau setara dengan PT PP Sinergi Banjaratma or equivalent to
Rp12.684.923.000. PT PP Sinergi Banjartama Rp12,684,923,000. PT PP Sinergi Banjartama was
didirikan sesuai Akta Pendirian No. 2 tanggal 7 established under Notarial deed of Establishment
Februari 2019 dari Notaris Ni Nyoman Rai Sumawati, No. 2 dated February 7, 2019 of Notary Ni Nyoman
S.H., M.Kn. Rai Sumawati, S.H., M.Kn.
Berdasarkan akta No. 5 oleh notaris Ni Nyoman Rai Based on deed no. 5 by notary Ni Nyoman Rai
Sumawati, S.H.,M.Kn. di Jakarta, tanggal Sumawati, S.H., M.Kn. in Jakarta, on August 29, 2023
29 Agustus 2023, terdapat peningkatan modal dasar there was an increase in the authorized capital and
dan modal disetor PT PP Sinergi Banjartama paid-up capital of PT PP Sinergi Banjartama so that
sehingga prosentase penyertaan Perusahaan pada the percentage of the Company's participation in PT
PT PP Sinergi Banjartama menjadi 6,21%. PP Sinergi Banjartama became 6.21%.
PT Jasamarga Jogja Bawen PT Jasamarga Jogja Bawen
Perusahaan memiliki penyertaan sebesar 12,50% The Company has 12.50% investments in
pada PT Jasamarga Jogja Bawen atau setara PT Jasamarga Jogja Bawen or equivalent to
dengan Rp4.625.000.000. PT Jasamarga Jogja Rp4,625,000,000. PT Jasamarga Jogja Bawen
Bawen didirikan sesuai Akta Pendirian No. 11 tanggal was established under Notarial deed of
11 November 2020 dari Notaris Ni Nyoman Rai Establishment No. 11 dated November 11, 2020 of
Sumawati, S.H., M.Kn. Notary Ni Nyoman Rai Sumawati, S.H., M.Kn.
Berdasarkan keputusan Para Pemegang Saham di Based on the decision of the Shareholders outside
Luar Rapat Umum Pemegan Saham yang the General Meeting of Shareholders signed on
ditandatangani pada 29 September 2021, September 29, 2021, the Company increased its
Perusahaan menambah penyertaan pada investment in PT Jasamarga Jogja Bawen
PT Jasamarga Jogja Bawen sebesar Rp amounting to Rp 4,500,000,000.
4.500.000.000.
- 97 -
Page 95
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Berdasarkan keputusan Para Pemegang Saham di Based on the decision of the Shareholders outside
Luar Rapat Umum Pemegang Saham yang the General Meeting of Shareholders signed on
ditandatangani pada 29 Desember 2021, December 29, 2021, the Company increased its
Perusahaan menambah penyertaan pada investment in PT Jasamarga Jogja Bawen
PT Jasamarga Jogja Bawen sebesar amounting to Rp4,375,000,000.
Rp4.375.000.000.
Berdasarkan akta No. 05 oleh notaris Inne Based on deed No. 05 by notary Inne Kusumawati,
Kusumawati, S.H. di Kota Tangerang Selatan, S.H. in South Tangerang City, on April 18, 2023 there
tanggal 18 April 2023, terdapat peningkatan modal was an increase in the authorized capital and paid-up
dasar dan modal disetor PT Jasamarga Jogja Bawen capital of PT Jasamarga Jogja Bawen so thatthe
sehingga prosentase penyertaan Perusahaan pada percentage of the Company's participation in
PT Jasamarga Jogja Bawen menjadi 7,91%. PT Jasamarga Jogja Bawen became 7.91%.
PT Jasamarga Probolinggo Banyuwangi (JPB) PT Jasamarga Probolinggo Banyuwangi (JPB)
WTR, entitas anak, memiliki penyertaan sebesar WTR, a subsidiary, has 40% investment in JPB or
40% pada JPB setara Rp200.000.000, berdasarkan equivalent to Rp200,000,000, based on Notarial
Akta notaris No. 21 tanggal 29 Desember 2017 dari deed No. 21 dated December 29, 2017 of Notary Ni
Notaris Ni Nyoman Rai Sumawati, SH., M.Kn. Nyoman Rai Sumawati, SH., M.Kn.
Berdasarkan akta berita acara RUPS Notaris Based on GMS of Notary Ni Nyoman Rai
Ni Nyoman Rai Sumawati, S.H., M.Kn. No. 23 tanggal Sumawati, S.H., M.Kn. No. 23 dated January 24,
24 Januari 2018, kepemilikan WTR pada JPB 2018, WTR has ownership in JPB of 0.34%.
menjadi 0,34%.
Berdasarkan akta Notaris No. 30 tanggal 17 Juli 2018 Based on Notarial Deed No. 30 dated July 17, 2018
dari Notaris Ashoya Ratam, S.H., M.Kn., kepemilikan of Notary Ashoya Ratam, S.H., M.Kn., WTR has
WTR pada JPB menjadi 0,15%. ownership in JPB of 0.15%.
Berdasarkan akta No. 01 oleh Notaris Rina Utami Based on deed no. 01 by Notary Rina Utami Djauhari,
Djauhari, S.H. tanggal 06 September 2023, S.H. on September 6 2023, WTR's investment in JPB
penyertaan WTR pada JPB menjadi 0,07% akibat will become 0.07% due to an increase in paid-in
peningkatan modal disetor dan ditempatkan oleh capital and placement by other shareholders.
pemegang saham lain.
PT Hutama Marga Waskita (HMW) PT Hutama Marga Waskita (HMW)
WTR, entitas anak, memiliki penyertaan sebesar WTR, a subsidiary, has 30% investment in HMW or
30% dari modal HMW atau setara dengan equivalent to Rp4,500,000,000. HMW was
Rp4.500.000.000. HMW didirikan sesuai Akta established based on Notarial deed No. 24 dated
Pendirian No. 24 tanggal 20 Februari 2017 dari February 20, 2017 by Notary Ni Nyoman Rai
Notaris Ni Nyoman Rai Sumawati, S.H., M.Kn, Sumawati, S.H., M.Kn and is engaged in toll road
bergerak di bidang pengusahaan jalan tol. concession.
WTR menambah penyertaan pada HMW sebesar WTR increased its investment in HMW amounting
Rp22.800.000.000 berdasarkan Keputusan Sirkular to Rp22,800,000,000, based on the decree of
RUPS tanggal 24 Mei 2018 berdasarkan Akta No. 13 the Circular of GMS dated May 24, 2018, based on
dari Notaris Ni Nyoman Rai Sumawati, S.H., M.Kn., notarial deed No. 13 by Ni Nyoman Rai Sumawati,
tanggal 8 Juni 2018. S.H., M.Kn., dated June 8, 2018.
WTR menambah penyertaan pada HMW sebesar WTR increased its investment in HMW amounting
Rp25.710.000.000 berdasarkan Keputusan Sirkuler to Rp25,710,000,000, based on the decree of
di luar RUPS tanggal 19 Desember 2019. the Circular outside of GMS dated December 19,
2019.
Berdasarkan akta No. 07 oleh Notaris Ni Nyoman Rai Based on deed No. 07 by Notary Ni Nyoman Rai
Sumawati, S.H., M.Kn., tanggal 11 Oktober 2021, Sumawati, S.H., M.Kn., dated October 11, 2021,
penyertaan WTR pada HMW menjadi 2,96% akibat WTR's investment in HMW became 2.96% due to
peningkatan modal disetor dan ditempatkan oleh an increase in paid-in and issued capital by
pemegang saham mayoritas. Utang HMW kepada the majority shareholder. HMW's debt to WTR
WTR sebesar Rp550.000.000 dikonversi menjadi amounting to Rp550,000,000 was converted into
penyertaan modal. equity participation.
- 98 -
Page 96
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Berdasarkan akta No. 09 oleh Notaris Ni Nyoman Rai Based on deed No. 09 by Notary Ni Nyoman Rai
Sumawati, S.H., M.Kn., tanggal 30 Desember 2022, Sumawati, S.H., M.Kn., dated December 30, 2022,
penyertaan WTR pada HMW menjadi 0,63% akibat WTR's investment in HMW became 0,63% due to
peningkatan modal disetor dan ditempatkan oleh an increase in paid-in and issued capital by
pemegang saham mayoritas. the majority shareholder.
Berdasarkan akta No. 06 oleh Notaris Ni Nyoman Rai Based on deed no. 06 by Notary Ni Nyoman Rai
Sumawati, S.H., M.Kn., tanggal 26 Juni 2023, Sumawati, S.H., M.Kn., dated June 26, 2023, WTR's
penyertaan WTR pada HMW menjadi 0,50% akibat participation in HMW became 0.50% due to an
peningkatan modal disetor dan ditempatkan oleh increase in paid-in and issued capital by the majority
pemegang saham mayoritas. shareholder.
PT Jasamarga Gedebage Cilacap (JGC) PT Jasamarga Gedebage Cilacap (JGC)
Pendirian PT Jasamarga Gedebage Cilacap adalah The establishment of PT Jasamarga Gedebage
sesuai dengan akta notaris Ni Nyoman Cilacap was based on notarial deed No. 8 dated
Rai Sukmawati, S.H., M.Kn. No. 8 tanggal January 28, 2022 of notary Ni Nyoman Rai
28 Januari 2022. Akta pendirian ini telah mendapat Sukmawati, S.H., M.Kn. This notarial deed has
pengesahan Menteri Hukum dan Hak been approved by the Minister of Law and
Asasi Manusia sesuai dengan Surat Keputusan Human Rights through decision letter
No. AHU-0007639.AH.0101.TAHUN 2022 tanggal No. AHU-0007639.AH.0101.TAHUN 2022 dated
29 Januari 2022. Perusahaan memiliki penyertaan January 29,2022. The Company has 20% investment
sebesar 20% pada JGC atau setara in JCG or equivalent to Rp1,219,100,000.
Rp1.219.100.000.
Manajemen berpendapat bahwa tidak terdapat Management believes that there is no significant
perbedaan yang signifikan antara jumlah tercatat difference between book value and the fair value.
dengan nilai wajarnya.
18. ASET TETAP - BERSIH 18. FIXED ASSETS - NET
31 Maret/ March 31, 2024
Saldo Awal/ Penambahan/ Reklasifikasi/ Pengurangan/ Revaluasi/ Saldo Akhir/
Beginning Balance Addition Recassification Deduction Revaluation Ending Balance
Rp Rp Rp Rp Rp Rp
Biaya Perolehan Acquisition Cost
Tanah 2.408.381.009.307 -- -- -- -- 2.408.381.009.307 Land
Gedung 1.483.364.951.408 -- -- -- -- 1.483.364.951.408 Building
Pabrik 1.218.259.120.754 -- 2.280.496.746 -- -- 1.220.539.617.500 Plant
Perlengkapan Kantor 118.613.758.372 534.814.866 -- 760.327.229 -- 118.388.246.009 Office Supplies
Peralatan Proyek 5.116.041.504.961 2.894.664.953 -- 66.115.879.134 -- 5.052.820.290.780 Project Equipments
Kendaraan 12.396.119.323 247.500.000 -- 621.900.000 -- 12.021.719.323 Vehicles
Jumlah 10.357.056.464.125 3.676.979.819 2.280.496.746 67.498.106.363 -- 10.295.515.834.327 Total
Aset dalam Pembangunan Assets in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 85.649.300.527 2.656.921.745 (2.676.617.417) -- -- 85.629.604.855 Project Equipments
Akumulasi Penyusutan Accumulated Depreciation
Gedung 304.658.334.859 7.764.962.926 -- -- -- 312.423.297.785 Building
Pabrik 374.431.889.045 17.947.028.715 -- -- -- 392.378.917.760 Plant
Perlengkapan Kantor 95.659.232.155 4.282.285.130 -- 637.991.473 -- 99.303.525.812 Office Supplies
Peralatan Proyek 4.071.801.601.054 87.048.103.988 -- 66.115.879.134 -- 4.092.733.825.908 Project Equipments
Kendaraan 11.818.363.687 41.436.237 -- 371.768.717 -- 11.488.031.207 Vehicles
Jumlah 4.858.369.420.800 117.083.816.996 -- 67.125.639.324 -- 4.908.327.598.472 Total
Akumulasi Penurunan Nilai Accumulated Impairment
Biaya Perolehan Acquisition Cost
Tanah 223.514.951.077 -- -- -- -- 223.514.951.077 Land
Pabrik 51.016.131.126 -- -- -- -- 51.016.131.126 Plant
Peralatan Proyek 252.091.814.111 -- -- -- -- 252.091.814.111 Project Equipments
Aset Tetap Dalam Penyelesaian Construction in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 50.073.448.743 -- -- -- -- 50.073.448.743 Project Equipments
Jumlah 576.696.345.057 -- -- -- -- 576.696.345.057 Total
Nilai Buku 5.007.639.998.795 4.896.121.495.653 Book Value
- 99 -
Page 97
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Desember/ December 31, 2023
Saldo Awal/ Penambahan/ Reklasifikasi/ Pengurangan/ Revaluasi/ Saldo Akhir/
Beginning Balance Addition Recassification Deduction Revaluation Ending Balance
Rp Rp Rp Rp Rp Rp
Biaya Perolehan Acquisition Cost
Tanah 2.264.204.161.364 -- 404.000.000 -- 143.772.847.943 2.408.381.009.307 Land
Gedung 1.624.189.439.820 -- 479.303.350 -- (141.303.791.762) 1.483.364.951.408 Building
Pabrik 1.197.112.272.174 740.450.000 20.406.398.580 -- -- 1.218.259.120.754 Plant
Perlengkapan Kantor 113.780.591.564 6.360.527.058 (1.527.360.250) -- -- 118.613.758.372 Office Supplies
Peralatan Proyek 5.081.554.489.149 934.621.287 83.427.878.970 49.875.484.445 -- 5.116.041.504.961 Project Equipments
Kendaraan 12.148.619.323 247.500.000 -- -- -- 12.396.119.323 Vehicles
Jumlah 10.292.989.573.394 8.283.098.345 103.190.220.650 49.875.484.445 2.469.056.181 10.357.056.464.125 Total
Aset dalam Pembangunan Assets in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 200.896.888.113 3.920.884.450 (119.168.472.036) -- -- 85.649.300.527 Project Equipments
Akumulasi Penyusutan Accumulated Depreciation
Gedung 253.775.588.668 70.396.205.258 (1.507.997.410) -- (18.005.461.657) 304.658.334.859 Building
Pabrik 300.991.262.423 73.440.626.622 -- -- -- 374.431.889.045 Plant
Perlengkapan Kantor 97.463.837.012 15.485.576.766 (17.290.181.623) -- -- 95.659.232.155 Office Supplies
Peralatan Proyek 3.636.006.348.550 485.561.919.792 3.281.399 49.769.948.687 -- 4.071.801.601.054 Project Equipments
Kendaraan 11.458.347.933 360.015.754 -- -- -- 11.818.363.687 Vehicles
Jumlah 4.299.695.384.586 645.244.344.192 (18.794.897.634) 49.769.948.687 (18.005.461.657) 4.858.369.420.800 Total
Akumulasi Penurunan Nilai Accumulated Impairment
Biaya Perolehan Acquisition Cost
Tanah -- 223.514.951.077 -- -- -- 223.514.951.077 Land
Pabrik 6.962.153.326 44.053.977.800 -- -- -- 51.016.131.126 Plant
Peralatan Proyek -- 252.091.814.111 -- -- -- 252.091.814.111 Project Equipments
Aset Tetap Dalam Penyelesaian Construction in Progress
Gedung, Pabrik, dan Building, Plant
Peralatan Proyek 50.073.448.743 -- -- -- -- 50.073.448.743 Project Equipments
Jumlah 57.035.602.069 296.145.791.911 -- -- -- 576.696.345.057 Total
Nilai Buku 6.194.191.076.921 5.007.639.998.795 Book Value
Aset tetap, berupa tanah, pabrik, kendaraan dan Fixed assets in the form of land, plants, vehicles and
gedung dijadikan jaminan atas perolehan kredit buildings are used as collateral for Long-Term bank
jangka panjang MRA dari bank. Sebagian tanah loans MRA. Some land and buildings above are used
berikut gedungnya dijadikan jaminan kepada as collaterals to PT Bank Mandiri (Persero) Tbk,
PT Bank Mandiri (Persero) Tbk, PT Bank Negara PT Bank Negara Indonesia (Persero) Tbk, and
Indonesia (Persero) Tbk, dan PT Bank Rakyat PT Bank Rakyat Indonesia (Persero) Tbk amounting
Indonesia (Persero) Tbk masing-masing sebesar to Rp143,700,000,000, Rp541.247.689.363, and
Rp143.700.000.000, Rp541.247.689.363, dan Rp55,000,000,000, respectively, with a total amount
Rp55.000.000.000, dengan nilai keseluruhan of Rp739,947,689,363 with the fair value of the land
Rp739.947.689.363 dengan nilai wajar and buildings as collateral amounting to
tanah dan gedung yang dijaminkan sebesar Rp717,808,875,983.
Rp717.808.875.983.
Gedung, pabrik dan peralatan dalam pembangunan The buildings, plants and equipment under
pada 31 Maret 2024 sebesar Rp85.629.604.855 construction as of March 31, 2024 amounting
terutama terdiri dari bangunan dalam penyelesaian to Rp85,629,604,855 mainly consisted of
dari WKI, sebesar Rp3.270.619.598, pabrik beton buildings in progress which belonging to WKI,
dalam penyelesaian sebesar Rp72.411.515.203 dan amounting to Rp3,270,619,598 precast plant in
peralatan dan renovasi gedung Perusahaan sebesar progress amounting to Rp72,411,515,203 and
Rp9.947.470.054. the Company’s equipment and building renovation
amounting to Rp9,947,470,054.
Berikut presentase dan estimasi penyelesaian aset The following are the percentages and estimated
dalam pembangunan pada tanggal 31 Maret 2024: date of completion of assets under construction as
of March 31, 2024:
Proyek/ Penyelesaian/
Project Percentage of Completion
Pembangunan Plant Bojonegoro 95,26%
Pembangunan Plant Gasing 99,53%
Pembangunan Proyek Penajam 75,73%
Pembangunan Plant Cikopo 84,90%
Proyek Pembangunan Dormitory Karawang 91,92%
Tidak ada kemajuan progres atas proyek di atas There is no progress on the projcets above since prior
sejak tahun lalu. year.
- 100 -
Page 98
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Gedung, pabrik dan peralatan dalam pembangunan The buildings, plants and equipment under
pada 31 Desember 2023 sebesar Rp85.649.300.527 construction as of December 31, 2023 amounting to
terutama terdiri dari bangunan dalam penyelesaian Rp85,649,300,527 mainly consisted of buildings in
dari WKI, sebesar Rp3.270.619.598, pabrik beton progress which belonging to WKI, amounting to
dalam penyelesaian sebesar Rp72.035.090.203 dan Rp3,270,619,598, precast plant in progress
peralatan dan renovasi gedung Perusahaan sebesar amounting to Rp72,035,090,203 and the Company’s
Rp10.343.590.726. equipment and building renovation amounting to
Rp10,343,590,726.
Berdasarkan penilaian independen KJPP Agus, Ali, Based on the independent assessment of KJPP
Firdaus dan Rekan yang ditandatangani oleh M. Agus, Ali, Firdaus dan Partners signed by
Firdaus Asriadin, KJPP Sugeng, Irwan, Gunawan M. Firdaus Asriadin, KJPP Sugeng, Irwan, Gunawan
dan Rekan yang ditandatangani oleh Muhlis dan Partners signed by Muhlis Indrawan, the fair
Indrawan, nilai wajar tanah dan bangunan value of the Company's land and buildings as of
Perusahaan per 31 Desember 2023 adalah sebesar December 31,2023 is Rp841,118,492,000, resulting
Rp841.118.492.000, sehingga menghasilkan surplus in a revaluation surplus of Rp21,414,929,593 and
revaluasi sebesar Rp21.414.929.593 dan dicatat recorded at Rp19,273,436,633 as a component of
sebesar Rp19.273.436.633 pada sebagai komponen other equity after deducting tax. This assessment is
ekuitas lainnya setelah dikurangi dengan pajak. based on a market approach and a cost approach.
Penilaian ini berdasarkan pendekatan pasar dan
pendekatan biaya.
Revaluasi aset tetap dilakukan secara berkala setiap Revaluation of fixed assets will be done periodically
tiga (3) tahun. every three (3) years.
Penilaian atas nilai wajar aset tetap WKI berupa The valuation of fair value of the WKI fixed asset in
tanah dan bangunan dilakukan oleh penilai the form of land and building was performed by
independen, Kantor Jasa Penilai Publik Kantor Jasa independent appraiser, Kantor Jasa Penilai Publik
Penilai Publik Muttaqin, Bambang, Purwanto, Rozak, Muttaqin, Bambang, Purwanto, Rozak, Uswatun, dan
Uswatun, dan Rekan dengan laporan Rekan with report No. 00337/2.0027-
No. 00337/2.0027-00/PI/11/0196/1/III/2024 tanggal 00/PI/11/0196/1/III/2024 dated March 15, 2023.
15 Maret 2023.
Penilaian atas nilai wajar aset tetap WSE berupa The valuation of fair value of the WSE’s fixed asset in
tanah dan bangunan dilakukan oleh penilai the form of land and building was performed by
independen, Ir. Sukardi, MAPPI (Cert.), Kantor Jasa independent appraiser, Ir. Sukardi, MAPPI (Cert.),
Penilai Publik Sukandi, Israr, dan Rekan, dengan Kantor Jasa Penilai Publik Sukandi, Israr, dan Rekan,
laporan No. 00013/2.0011-00/PI/02/0043/1/XI/2023 with report No. 00013/2.001100/PI/02/
tanggal 8 November 2023. 0043/1/XI/2023 dated November 8, 2023.
Berdasarkan Memo persetujuan dari Direksi Based on Memo approval from the Board of Directors
PT Waskita Beton Precast Tbk. Nomor PT Waskita Beton Precast Tbk. Number
24.2/MP/WBP/DIR.2024 tanggal 4 Maret 2024 telah 24.2/MP/WBP/DIR.2024 dated March 4 2024, it was
disetujui penghapusan aset tetap atas divestasi, approved to write off fixed assets upon divestment,
dengan harga perolehan / Acquisition Value sebesar with an Acquisition Value of Rp66,115,879,134.
Rp66.115.879.134. Divestasi dilakukan melalui Divestment was carried out through the Purwakarta
Kantor Pelayanan Kekayaan Negara dan Lelang State Wealth Services and Auction Office.
Purwakarta.
Penilaian ini dilakukan berdasarkan pendekatan This assessment is based on the market approach,
pasar, pendapatan dan biaya. revenue and cost.
Beban penyusutan dialokasikan sebagai berikut: Depreciation expenses are allocated as follows:
31 Maret/ March 31
2024 2023
Rp Rp
Beban Pokok Pendapatan 54.332.500.743 145.731.929.274 Cost of Revenues
Beban Umum dan Administrasi 62.751.316.253 39.413.477.057 General and Administrative Expenses
Jumlah 117.083.816.996 185.145.406.331 Total
Pada tanggal 31 Maret 2024, gedung, pabrik, As at March 31, 2024, buildings, plants, project
peralatan proyek dan kendaraan untuk seluruh unit equipments and vehicles for all business units and
bisnis serta kantor pusat telah diasuransikan dengan head office were insured as follows:
nilai pertanggungan dan risiko sebagai berikut:
- 101 -
Page 99
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Nama Asuradur/ Jenis Aset/ Periode Asuransi/ Nilai Pertanggungan/ Perusahaan/
Insurer Type of Assets Insurance Period The Sum Insured Company
Rp
PT Asuransi Jasa Tania Tbk Asuransi Risiko Properti/ Property All Risk Insurance 1 Februari/ February 1, 2024 s.d/ to 1 Februari/ February 1, 2025 220.026.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Jasa Tania Tbk Asuransi Gempa Bumi/ Earthquake Insurance 1 Februari/ February 1, 2024 s.d/ to 1 Februari/ February 1, 2025 220.026.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 4 Maret/ March 4, 2024 s.d/ to 4 Maret/ March 4, 2025 173.860.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 4 Maret/ March 4, 2024 s.d/ to 4 Maret/ March 4, 2025 173.860.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 96.379.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 96.379.000.000 PT Waskita Beton Precast Tbk
PT BRI Asuransi Indonesia Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 86.743.000.000 PT Waskita Beton Precast Tbk
PT BRI Asuransi Indonesia Asuransi Gempa Bumi/ Earthquake Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 86.743.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Tri Pakarta Asuransi Risiko Properti/ Property All Risk Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 67.429.710.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Tri Pakarta Asuransi Gempa Bumi/ Earthquake Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 67.429.710.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 2.452.470.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Kebakaran/ Fire Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 2.452.470.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Aspan Asuransi Risiko Properti/ Property All Risk Insurance 25 Mei/ May 25, 2023 s.d/ to 25 Mei/ May 25, 2024 2.022.226.500 PT Waskita Karya (Persero) Tbk
PT Asuransi Tri Pakarta Asuransi Industrial All Risk / Industrial All Risk Insurance 26 Februari/ Februari 26, 2024 s.d/ to 1 Agustus/ August 1, 2024 1.221.150.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Tri Pakarta Asuransi Gempa Bumi/ Earthquake Insurance 26 Februari/ Februari 26, 2024 s.d/ to 1 Agustus/ August 1, 2024 1.221.150.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Central Asia (ACA) Asuransi Industrial All Risk / Industrial All Risk Insurance 12 November/ November 12, 2023 s.d/ to 12 November/ November 12, 2024 132.869.900.000 PT Waskita Karya Infrastruktur
PT Sunday Insurance Indonesia Asuransi Risiko Properti/ Property All Risk Insurance 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 123.683.628.714 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Asuransi Gempa Bumi/ Earthquake Insurance 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 123.683.628.714 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 20.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Polis Liabilitas Publik/ Public Liability Policy 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 5.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Business Interruption Insurance (PAR) 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 25.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Business Interruption Insurance (MB) 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 20.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Business Interruption Insurance (EQVET) 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 25.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Personal Accident 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 5.056.000 PT Waskita Karya Realty
Jumlah/ Total 1.773.487.099.928
Pada tanggal 31 Desember 2023, gedung, pabrik, As of December 31, 2023, buildings, plants, project
peralatan proyek dan kendaraan untuk seluruh unit equipments and vehicles for all business units and
bisnis serta kantor pusat telah diasuransikan dengan head office were insured as follows:
nilai pertanggungan dan risiko sebagai berikut:
Nama Asuradur/ Jenis Aset/ Periode Asuransi/ Nilai Pertanggungan/ Perusahaan/
Insurer Type of Assets Insurance Period The Sum Insured Company
Rp
PT Asuransi Kredit Indonesia (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 1 Februari/ February 1, 2023 s.d/ to 1 Februari/ February 1, 2024 220.026.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 1 Februari/ February 1, 2023 s.d/ to 1 Februari/ February 1, 2024 220.026.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 4 Maret/ March 4, 2023 s.d/ to 4 Maret/ March 4, 2024 173.860.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 4 Maret/ March 4, 2023 s.d/ to 4 Maret/ March 4, 2024 173.860.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 96.379.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Kredit Indonesia (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 96.379.000.000 PT Waskita Beton Precast Tbk
PT BRI Asuransi Indonesia Asuransi Risiko Properti/ Property All Risk Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 86.743.000.000 PT Waskita Beton Precast Tbk
PT BRI Asuransi Indonesia Asuransi Gempa Bumi/ Earthquake Insurance 18 Januari/ January 18, 2024 s.d/ to 18 Januari/ January 18, 2025 86.743.000.000 PT Waskita Beton Precast Tbk
PT Asuransi Tri Pakarta Asuransi Risiko Properti/ Property All Risk Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 67.429.710.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Tri Pakarta Asuransi Gempa Bumi/ Earthquake Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 67.429.710.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 2.452.470.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Kebakaran/ Fire Insurance 1 Agustus/ August 1, 2023 s.d/ to 1 Agustus/ August 1, 2024 2.452.470.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Aspan Asuransi Risiko Properti/ Property All Risk Insurance 25 Mei/ May 25, 2023 s.d/ to 25 Mei/ May 25, 2024 2.022.226.500 PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Kebakaran/ Fire Insurance 12 Maret/ March 12, 2023 s.d/ to 12 Maret/ March 12, 2024 1.269.270.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Jasindo (Persero) Asuransi Gempa Bumi/ Earthquake Insurance 12 Maret/ March 12, 2023 s.d/ to 12 Maret/ March 12, 2024 1.269.270.000 PT Waskita Karya (Persero) Tbk
PT Asuransi Central Asia (ACA) Asuransi Industrial All Risk 12 November/ November 12, 2023 s.d/ to 12 November/ November 12, 2024 132.869.900.000 PT Waskita Karya Infrastruktur
PT Sunday Insurance Indonesia Asuransi Risiko Properti/ Property All Risk Insurance 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 123.683.628.714 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Asuransi Gempa Bumi/ Earthquake Insurance 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 123.683.628.714 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 20.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Polis Liabilitas Publik/ Public Liability Policy 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 5.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Business Interruption Insurance (PAR) 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 25.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Business Interruption Insurance (MB) 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 20.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Business Interruption Insurance (EQVET) 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 25.000.000.000 PT Waskita Karya Realty
PT Sunday Insurance Indonesia Personal Accident 26 Juni/ June 26, 2023 s.d/ to 26 Juni/ June 26, 2024 5.056.000 PT Waskita Karya Realty
Jumlah/ Total 1.773.583.339.928
Manajemen berpendapat bahwa nilai The management believes that insurance coverage for
pertanggungan atas aset tetap yang fixed assets which have been insured are adequate to
diasuransikan adalah cukup untuk menutup cover the possible losses.
kemungkinan kerugian yang terjadi.
19. ASET HAK GUNA - BERSIH 19. RIGHT-OF-USE ASSETS - NET
Dibawah ini adalah jumlah yang tercatat aset hak Below are the carrying amount of right-of-use assets
guna yang diakui dan mutasinya selama periode recognized and the movements during the period:
berjalan:
- 102 -
Page 100
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
1 Januari/ Penambahan/ Pengurangan/ 31 Maret/
Januari 1, 2023 Additions Deductions March 31, 2023
Rp Rp Rp Rp
Aset Guna Usaha
Tanah 36.604.513.052 2.327.166.466 -- 38.931.679.518
Bangunan 4.889.348.814 3.086.986.427 -- 7.976.335.241
Kendaraan 139.853.321.842 -- 14.746.132.342 125.107.189.500
Peralatan 4.443.979.566 -- -- 4.443.979.566
Jumlah Harga Perolehan 185.791.163.274 5.414.152.893 14.746.132.342 176.459.183.825
Akumulasi Depresiasi
Tanah 31.490.629.392 -- 1.458.259.837 30.032.369.555
Bangunan 3.931.156.971 2.355.981.669 -- 6.287.138.640
Kendaraan 119.505.919.811 5.101.507.733 4.807.137.381 119.800.290.163
Peralatan 4.443.979.567 -- -- 4.443.979.567
Total 159.371.685.741 7.457.489.402 6.265.397.218 160.563.777.925
Jumlah Aset Guna Usaha 26.419.477.533 15.895.405.900
1 Januari/ Penambahan/ Pengurangan/ 31 Desember/
Januari 1, 2023 Additions Deductions December 31, 2022
Rp Rp Rp Rp
Aset Guna Usaha
Tanah 36.849.513.052 -- 245.000.000 36.604.513.052
Bangunan 9.907.863.466 275.366.419 5.293.881.071 4.889.348.814
Kendaraan 137.053.091.510 13.260.197.114 10.459.966.782 139.853.321.842
Peralatan 5.929.211.568 -- 1.485.232.002 4.443.979.566
Jumlah Harga Perolehan 189.739.679.596 13.535.563.533 17.484.079.855 185.791.163.274
Akumulasi Depresiasi
Tanah 24.841.616.308 6.746.972.266 97.959.182 31.490.629.392
Bangunan 8.725.623.081 499.414.961 5.293.881.071 3.931.156.971
Kendaraan 111.713.959.790 18.103.519.867 10.311.559.846 119.505.919.811
Peralatan 4.827.819.060 -- 383.839.493 4.443.979.567
Total 150.109.018.239 25.349.907.094 16.087.239.592 159.371.685.741
Jumlah Aset Guna Usaha 39.630.661.357 26.419.477.533
Grup menyewa beberapa aset termasuk tanah, The Group leases several assets including land,
bangunan, kendaraan dan peralatan. Rata - rata buildings, vehicles and equipment. The average
masa sewa adalah 2,5 tahun. lease term is 2.5 years.
Beban amortisasi aset hak guna usaha dicatat Amortization expense of right of use assets
sebagai beban umum dan administrasi. recorded in general and administrative expense.
Berikut adalah jumlah laba rugi yang diakui dalam The following are the amounts recognized in profit or
laba rugi: loss:
31 Maret/ 31 Maret/
March 31, 2024 March 31, 2023
Rp Rp
Beban penyusutan aset hak guna 1.513.633.582 36.780.836.824 Depreciation expense of right-of-use assets
Beban bunga liabilitas sewa 78.894.402 1.967.811.364 Interest expense on lease liabilities
Jumlah yang diakui dalam laba rugi 1.592.527.984 38.748.648.188 Total amount recognized in profit or loss
Pada tanggal 31 Maret 2024 dan 31 Desember 2023 On March 31, 2024 and December 31, 2023 the total
total pengeluaran kas untuk sewa adalah sebesar cash disbursements for leases amounting to
Rp14.631.285.746 dan Rp24.007.954.486. Rp14,631,285,746 and Rp24,007,954,486
respectively.
20. GOODWILL 20. GOODWILL
2024
1 Januari/ Penambahan/ Pengurangan/ 31 Maret/
January 1, Additions Deduction March 31,
Rp Rp Rp Rp
Biaya Perolehan 4.025.903.165.936 -- (684.194.424.739) 3.341.708.741.197 Acquisition Cost
Nilai Buku 4.025.903.165.936 -- (684.194.424.739) 3.341.708.741.197 Net Book Value
- 103 -
Page 101
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
2023
1 Januari/ Penambahan/ Pengurangan/ 31 Desember/
January 1, Additions Deduction December 31,
Rp Rp Rp Rp
Biaya Perolehan 4.025.903.165.936 -- -- 4.025.903.165.936 Acquisition Cost
Nilai Buku 4.025.903.165.936 -- -- 4.025.903.165.936 Net Book Value
Rincian nilai tercatat goodwill adalah sebagai berikut: The details of goodwill are as follows:
Nilai Neto/ Net Value
Entitas Pengakuisisi/ Perolehan Saham pada/ Tahun Perolehan/ 31 Maret/ 31 Desember/
Acquirer Entity Share Acquisition in Year of Acquisition March 31, 2024 December 31, 2023
Rp Rp
PT Waskita Toll Road PT Waskita Transjawa Toll Road 2022 3.099.202.962.876 3.099.202.962.876
PT Waskita Toll Road PT Pemalang Batang Toll Road (PBTR) 2016 183.723.536.629 183.723.536.629
PT Waskita Toll Road PT Waskita Sriwijaya Tol (WST) 2016 58.782.241.692 58.782.241.692
PT Waskita Toll Road PT Trans Jabar Tol (TJT) 2015 -- 684.194.424.739
Jumlah/ Total 3.341.708.741.197 4.025.903.165.936
Akuisisi WTTR WTTR Acquisition
Pada tanggal 31 Desember 2021, WTR memiliki As at December 31, 2021 WTR has a 35.5%
kepemilikan sebesar 35,5% di WTTR dan mencatat interest in WTTR and recorded the investment as
investasi tersebut sebagai investasi asosiasi. an investment in associates.
Berdasarkan Berita Acara RUPUP Reksa Dana Based on the Minutes of RUPUP Equity Limited
Penyertaan Terbatas Ekuitas Danareksa Infrastruktur Participation Mutual Fund Danareksa Trans Java
Trans Jawa (“RDPT EDITJ”) No. 89 tanggal 27 Juli Infrastructure (“RDPT EDITJ”) No. 89 dated
2022 oleh Notaris Ir Nanette Cahyanie Handari Adi July 27, 2022 by Notary Ir Nanette Cahyanie
Warsito, WTR melakukan pelunasan secara Handari Adi Warsito, WTR will pay off in stages
bertahap terhadap unit penyertaan para pemegang the participation units of RDPT unit holders of around
unit RDPT sekitar 80% dari total unit yang dimiliki 80% of the total units owned by RDPT investors,
investor RDPT yaitu sebesar Rp5.256.112.000.000. which is Rp5,256,112,000,000. The gradual
Pelaksanaan pelunasan bertahap tersebut dilakukan redemption will be carried out no later than August
paling lambat Agustus 2022. WTR akan membeli sisa 2022. WTR will buy the remaining units if it has
unit penyertaan apabila sudah memiliki ketersediaan available funds with an estimated value of
dana dengan estimasi nilai sebesar Rp1,300,000,000,000.
Rp1.300.000.000.000.
Berdasarkan akta No.60 tanggal 26 Agustus 2022 Based on deed No. 60 dated 26 August 2022 made
yang dibuat dihadapan Ir. Nanette Cahyanie Handari before Ir. Nanette Cahyanie Handari Adi Warsito,
Adi Warsito, bahwa para pemegang saham whereas the shareholders agreed to WTR's action
menyetujui tindakan WTR melakukan Call Option to make a Call Option for RDPT shares in WTTR
saham RDPT di WTTR melalui pembelian unit through the purchase of a participation unit
penyertaan (Subscription) dengan harga sebesar (Subscription) at a price of Rp6,546,570,473,856.
Rp6.546.570.473.856.
Berdasarkan surat konfirmasi pembelian Based on purchase confirmation letter
No.CPD1906FXQ37565 tanggal 30 Agustus 2022, No.CPD1906FXQ37565 dated August 30, 2022,
WTR telah melakukan pembelian 80% penyertaan WTR has purchased 80% investment in RDPT in
RDPT sebesar Rp5.256.112.000.000. the amount of Rp5,256,112,000,000.
Nilai wajar aset yang diperoleh dan kewajiban yang The fair value of the assets acquired and liabilities
dialihkan pada tanggal akuisisi adalah sebagai assumed at the acquisition date were as follows:
berikut:
Kas dan Setara Kas 592.155.597.432 Cash and Cash Equivalents
Kas yang Dibatasi Penggunaannya 37.152.657.435 Restricted Cash
Piutang lain-lain 3.933.193.897.861 Other Receivables
Uang Muka dan Biaya Dibayar di Muka 159.705.967.881 Advances and Prepaid Expense
Pajak Dibayar Dimuka 1.291.833.496 Prepaid Tax
Aset Tetap 711.370.880 Fixed Asset
Aset Takberwujud - Hak Pengusahaan Jalan Tol 4.758.609.943.178 Intangible Assets - Toll Road Concession Right
Aset Hak Guna 2.112.797.313 Right of Use Asset
Aset Pajak Tangguhan 19.114.431 Deferred Tax Asset
Utang Usaha (228.094.511.490) Trade Payable
- 104 -
Page 102
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Biaya yang Masih Harus Dibayar (2.289.316.663) Accrual Expenses
Utang Pajak (574.687.217.350) Tax Payable
Utang Bank (2.728.861.984.472) Bank Loan
Provisi pelapisan jalan tol (66.277.758.922) Provision for overlay
Liabilitas Sewa (2.377.739.580) Lease Liabilities
Liabilitas Lain-lain (462.281.294.927) Other Liabilities
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 5.420.083.356.506 Net Asset Acquired
Goodwill dan arus kas keluar bersih yang timbul dari Goodwill and net cash outflow arising from such
akuisisi adalah sebagai berikut: acquisition are as follows:
Imbalan kas yang dialihkan 5.256.112.000.000 Cash consideration transferred
Kepentingan non-pengendali 646.073.936.094 Non-controlling interest
Investasi Asosiasi 2.617.100.383.287 Investment in associate
Sub jumlah 8.519.286.319.381 Subtotal
Nilai Wajar Aset Bersih teridentifikasi Fair Value of identifiable
yang diperoleh (5.420.083.356.506) net asset acquired
Goodwill yang timbul dari akuisisi 3.099.202.962.875 Goodwill arising from acquisition
Akuisisi WST WST Acquisition
Nilai wajar aset yang diperoleh dan kewajiban yang The fair values of the assets acquired and liabilities
dialihkan pada tanggal akuisisi adalah sebagai assumed at the acquisition date were as follows:
berikut:
Kas dan Setara Kas 303.517.604.893 Cash and Cash Equivalents
Aset Pajak Tangguhan 1.232.557.000 Deferred Tax Assets
Proyek Dalam Pelaksanaan 135.758.968.659 Project on Progress
Aset Tetap 36.876.125 Fixed Assets
Utang Pajak (6.050.791.698) Tax Payables
Utang Pihak Berelasi (3.471.807.800) Related Parties Payable
Liabilitas Imbalan Kerja (3.993.810.000) Post-Employment Benefit
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 427.029.597.179 Net Asset Acquired
Nilai Wajar Aset Kepentingan Nonpengendali (170.811.838.872) Fair value of Non-Controlling Interest
Goodwill 58.782.241.693 Goodwill
Nilai Wajar Imbalan yang Dialihkan 315.000.000.000 Fair Value of Consideration Transferred
Pada tanggal 19 Mei 2016, WTR dan On May 19, 2016, WTR and PT Persada Tanjung
PT Persada Tanjung Api - api menandatangani Api - api entered into an agreement to purchase 60%
perjanjian pembelian 60% kepemilikan PT WST ownership interest in PT WST amounting to
dengan harga perolehan sebesar Rp315,000,000,000.
Rp315.000.000.000.
Akuisisi PBTR PBTR Acquisition
Nilai wajar aset yang diperoleh dan kewajiban yang The fair values of the assets acquired and liabilities
dialihkan pada tanggal akuisisi adalah sebagai assumed at the acquisition date were as follows:
berikut:
Kas dan Setara Kas 1.283.729.504 Cash and Cash Equivalents
Pajak Dibayar di Muka 576.893.132 Prepaid Tax
Aset Takberwujud - Hak Pengusahaan Jalan Tol 109.002.363.811 Intangible Assets - Toll Road Concession Right
Utang Pajak (39.261.438) Tax Payables
Beban Akrual (816.220.871) Accrued Expenses
Liabilitas Lain-lain Jangka Pendek (43.804.858) Other Liabilities - Current
Liabilitas Lain-lain Jangka Panjang (49.502.926.995) Other Liabilities - Non Current
Nilai Wajar Aset Bersih Teridentifikasi Fair Value of Identifiable
yang Diperoleh 60.460.772.285 Net Asset Acquired
Nilai Wajar Aset Kepentingan Nonpengendali (24.184.308.914) Fair value of Non-Controlling Interest
Goodwill 183.723.536.629 Goodwill
Nilai Wajar Imbalan yang Dialihkan 220.000.000.000 Fair Value of Consideration Transferred
- 105 -
Page 103
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pada tanggal 15 Februari 2016, WTR dan On February 15, 2016, WTR and PT Langkah Utama
PT Langkah Utama Perkasa, Countryside Investment Perkasa, Countryside Investment Corporation and
Corporation dan PT Sumber Mitra Jaya PT Sumber Mitra Jaya entered into an agreement to
menandatangani perjanjian pembelian 60% purchase 60% ownership in
kepemilikan PT PBTR dengan harga perolehan PT PBTR amounted to Rp220,000,000,000.
sebesar Rp220.000.000.000.
Manajemen berkeyakinan bahwa tidak terdapat Management believes that there is no indication of
indikasi penurunan nilai atas saldo goodwill tersebut. impairment of the goodwill balance.
21. ASET LAIN-LAIN 21. OTHER ASSETS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Uang Jaminan 592.424.892.841 916.886.892.733 Warranty
Tanah dan Bangunan 73.842.098.327 73.842.098.327 Land and Buildings
Aset Lain-lain - Bagi Hasil 208.542.512.037 210.491.507.475 Other Assets - Profit Sharing
Kas yang Dibatasi Penggunaannya - Jangka Panjang 85.440.822.652 88.074.293.185 Restricted Cash - Long - Term
Perangkat Lunak - Bersih 36.260.448.279 42.273.656.352 Software - net
Beban Kontrak Ditangguhkan 110.960.497.482 50.279.864.704 Contract Deferred Charges
Aset Tidak Lancar Lainnya 781.512.004.363 781.512.004.363 Other Non-current Assets
Dikurangi: Penyisihan Kerugian Penurunan Nilai (330.491.418.860) (330.491.418.860) Less: Allowance for Impairment Losses
Jumlah 1.558.491.857.121 1.832.868.898.279 Total
Uang Jaminan merupakan uang yang dipakai untuk Warranty is account used to issue a letter of
mengeluarkan surat jaminan/ bank garansi yang guarantee/ bank guarantee which can be given to
dapat diberikan kepada Pengguna Jasa dalam Service Users in the context of implementing projects
rangka pelaksanaan proyek-proyek di dalam negeri, in the country, such as a Letter of Guarantee/ Tender
seperti Surat Jaminan/ Bank Garansi Tender, Surat Bank Guarantee, Letter of Guarantee/ Bank
Jaminan/ Bank Surat Jaminan/ Bank Garansi Uang Guarantee Letter/ Bank Guarantee for Advance
Muka, Surat Jaminan/ Bank Garansi Pelaksanaan, Payment, Letter Guarantee/ Implementation Bank
Surat Jaminan/Bank Garansi Retensi, Surat Guarantee, Letter of Guarantee/ Retention Bank
Jaminan/ Bank Garansi QHSE/ ESHS. Guarantee, Letter of Guarantee/ QHSE/ ESHS Bank
Guarantee.
Beban kontrak yang ditangguhkan merupakan beban Contract deferred charges represent deferred
yang ditangguhkan atas proyek-proyek yang dalam expense of the projects’ preparation, which will be
persiapan, yang akan dibebankan sebagai beban charged as expense when the project contract is
kontrak pada saat proyek tersebut dilaksanakan. executed.
Perangkat lunak terdiri dari: Software consists of:
31 Maret/ March 31, 2024
Harga Perolehan/ Akumulasi Amortisasi/ Nilai Buku/
Historical Cost Accumulated Amortication Book Value
Rp Rp Rp
SAP S/4 Hana 130.450.129.426 102.704.773.213 27.745.356.213
Building Information Modelling 7.462.259.602 5.519.141.670 1.943.117.932
Waskita Employee Self Service Technology (WEST) 822.180.000 822.180.000 --
Lain-lain/ Other s (dibawah/ below Rp 500 Juta/ Million ) 8.384.843.421 1.812.869.287 6.571.974.134
Jumlah/ Total 196.541.349.290 160.280.901.011 36.260.448.279
31 Desember/ December 31, 2023
Harga Perolehan/ Akumulasi Amortisasi/ Nilai Buku/
Historical Cost Accumulated Amortization Book Value
Rp Rp Rp
SAP S/4 Hana 130.450.129.426 98.471.320.963 31.978.808.463
Building Information Modelling 7.462.259.602 4.115.345.113 3.346.914.489
ERP MS Dynamics AX2012 49.421.936.841 49.421.936.841 --
Waskita Employee Self Service Technology (WEST) 822.180.000 822.180.000 --
Lain-lain/ Others (dibawah/ below Rp 500 Juta/ Million ) 8.384.843.421 1.436.910.021 6.947.933.400
Jumlah/ Total 196.541.349.290 154.267.692.938 42.273.656.352
Aset lain-lain tanah dan bangunan adalah sebagai Other assets land and buildings as follows:
berikut:
- 106 -
Page 104
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
1. Tanah di Cengkareng yang dibeli oleh 1. Land located in Cengkareng which was
Perusahaan pada tanggal 21 Mei 1991. purchased by the Company on May 21, 1991.
Berdasarkan Surat Pemerintah Kotamadya Then the Company received the answer by
Jakarta Barat Suku Dinas Tata Kota letter from the Sub Department of City
No. 288/17125 tanggal 18 Juli 1996, sesuai Planning, West Jakarta District No. 288/17125
dengan Rencana Bagian Wilayah Kota dated July 18, 1996, which accordance with
Kecamatan Kalideres tahun 2005 lokasi tanah the planning of the Kalideres District year 2005,
tersebut diperuntukan untuk Penyempurnaan the land is allocated for the Public Green
Hijau Umum (PHU), Sampai dengan akhir tahun Improvement, Until the end of 2021, The
2021 Perusahaan tidak dapat memproses company was unable to process the ownership
sertifikat kepemilikan lebih lanjut sehingga tanah certificate further so the land was recorded as
tersebut dicatat sebagai aset lain - lain per other assets as at December 31, 2021.
31 Desember 2021.
Pada tahun 2022, Perusahaan telah In 2022, the Company has obtained The Right of
memperoleh sertifikat Hak Guna Bangunan No. Building certificate No. 10451 on September 7,
10451 pada tanggal 7 September 2022. 2022. Based on this, the Company reclassified
Berdasarkan hal tersebut, Perusahan land assets in Cengkareng to Fixed Assets.
mereklasifikasi aset tanah di Cengkareng
menjadi Aset Tetap.
2. Apartemen sejumlah 50 unit yang merupakan 2. Apartments with a total of 50 units which are
pembayaran berupa aset atas piutang usaha dan asset settlement for accounts receivables and
retensi dari PT Ade Pede Realty pada tanggal 24 retention receivables from PT Ade Pede Realty
Mei 2022. on May 24, 2022.
Perusahaan tidak menggunakan tanah dan The Company does not use the land and
apartemen tersebut dalam kegiatan operasional the apartments in its operations or rental to the
ataupun menyewakannya kepada pihak ketiga, third parties in line with those assets is not
sehubungan aset tersebut tidak terkait dengan related to the main activities of the Company.
kegiatan utama Perusahaan. Perusahaan The management believes that the land and
berpendapat bahwa apartemen tanah tersebut the apartments do not meet the criteria to be
tidak memenuhi kriteria untuk diklasifikasikan classified as fixed assets, so that those assets
sebagai aset tetap, sehingga mencatat aset are recorded as other assets.
tersebut diatas sebagai aset lain-lain.
Aset lain-lain - bagi hasil terdiri dari: Other assets - profit sharing consists of:
Harga Perolehan/
Historical Cost
Nama Proyek Bagi Hasil/ 31 Maret/ 31 Desember/ Lokasi/
March 31, 2024 December 31, 2023
Name of Profit Sharing Project
Rp Rp Location
1 Teraskita Bandung 91.143.019.386 91.143.019.386 Bandung
2 Teraskita Makasar 127.144.469.847 127.144.469.847 Makasar
Sub Jumlah/ Sub Total 218.287.489.233 218.287.489.233
Akumulasi Amortisasi/ Accumulated Amortization
Aset Lain-lain Bagi Hasil/ Other Asset - Profit Sharing (9.744.977.196) (7.795.981.758)
Jumlah/ Total 208.542.512.037 210.491.507.475
Aset lain-lain - bagi hasil merupakan penambahan Other assets - profit sharing is the addition of
dari konstruksi dalam penyelesaian Hotel Dafam construction completion of Hotel Dafam Teraskita in
Teraskita di Bandung dan Makassar sebesar Bandung and Makassar amounting to
Rp208.542.512.037 dan Rp210.491.507.475 pada Rp208,542,512,037 and Rp210,491,507,475 as of
tanggal 31 Maret 2024 dan 31 Desember 2023. March 31, 2024 and December 31, 2023, respectively.
Berdasarkan Surat Pernyataan Direksi tanggal Based on the Board of Directors' Statement dated
18 April 2017, Perusahaan memberikan hak April 18, 2017, the Company granted
pengembangan tanah seluas 1.535 M2 yang terletak the development rights of 1,535 sqm of land
di Jl. Asia Afrika No. 55 RT 003 RW 03 Kelurahan located at Jl. Asia Africa No. 55 RT 003 RW 03
Kebon Pisang Kecamatan Sumur Bandung dengan Kebon Pisang Village, Sumur Bandung District with
bukti kepemilikan SHGB No. 655 atas proof of ownership of SHGB No. 655 on behalf of
- 107 -
Page 105
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
nama Perusahaan kepada PT Waskita the Company to PT Waskita Karya Realty. Based
Karya Realty. Berdasarkan Surat Pernyataan on Statement No. 81/SPN/WK/2017 dated
No. 81/SPN/WK/2017 tanggal 29 September 2017, September 29, 2017, the Company provided
Perusahaan memberikan hak pengembangan development rights to land covering an area of
tanah seluas 1.661 m2 berdasarkan SHGB No. 20407 1,661 sqm based on SHGB No. 20407 and an area
dan seluas 168 m2 berdasarkan SHGB No. 20403 of 168 sqm based on SHGB No. 20403 on behalf
atas nama Perusahaan, yang terletak di Jalan Jl. A.P. of the Company, located at Jalan Jl. A.P. Pettarani
Pettarani 88 RT 002 RW 02 Kelurahan Buakana 88 RT 002 RW 02 Village Buakana Rappocini
Kecamatan Rappocini Kota Makassar. District, Makassar City
Aset tidak lancar lainnya Other non-current assets
Berdasarkan Berita Acara Evaluasi Perubahan Based on the Minutes of Evaluation of Changes to
Rencana Usaha Pengusahaan Jalan Tol Krian - the Krian - Legundi - Bunder - Manyar Toll Road
Legundi - Bunder - Manyar No. 57/BA/Pt.6/2022 Concession Business Plan No. 57/BA/Pt.6/2022
tanggal 19 Juli 2022, WBW dan BPJT sepakat dated July 19, 2022, WBW and BPJT agreed to
melakukan penyesuaian Rencana Usaha Jalan Tol make adjustments to the KLBM Toll Road
KLBM, yang mengakibatkan konstruksi dan Business Plan, which resulted in the construction
pengusahaan Seksi IV (Bunder-Manyar) sepanjang and concession of 9.39 km Section IV (Bunder-
9,39 km di bundling dengan pengusahaan Manyar) being bundling with the concession of the
jalan tol Tuban-Gresik. Berdasarkan hal tersebut, Tuban - Gresik toll road. Based on
WBW melakukan reklasifikasi dari Aset Dalam the foregoing, WBW reclassified from Intangible
Penyelesaian Aset Tak Berwujud - Hak Assets - Toll Road Concession Rights to other assets
Pengusahaan Jalan Tol ke aset lain-lain sebesar in the amount of Rp781,512,004,363.
Rp781.512.004.363.
WBW melakukan pencadangan beban kerugian WBW provided allowance for impairment losses on
penurunan nilai atas potensi kemungkinan aset potential assets under construction that cannot be
dalam penyelesaian yang tidak dapat terpulihkan recovered as Rp330.491.418.860 which was
Rp330.491.418.860 yang tercatat sebagai recorded as Other Income (Expenses) – Net.
pendapatan (beban) Lain - lain - Bersih.
22. ASET TAK BERWUJUD – HAK PENGUSAHAAN 22. INTANGIBLE ASSETS – TOLL ROAD
JALAN TOL CONCESSION RIGHTS
31 Maret/ March 31, 2024
Saldo Awal/ Penambahan/ Pengurangan/ Reklasifikasi/ Penyesuaian/ Saldo Akhir/
Beginning Balance Additions Deductions Reclassification Adjustment Ending Balance
Rp Rp Rp Rp Rp Rp
Biaya Perolehan Acquisition Cost
Ruas Jalan Tol : Toll Road Section :
Krian-Legundi-Bunder 10.796.542.312.941 -- -- 922.673.040.373 -- 11.719.215.353.314 Krian-Legundi-Bunder
Pemalang - Batang 7.869.740.216.309 -- -- -- -- 7.869.740.216.309 Pemalang - Batang
Ciawi - Sukabumi 4.605.402.061.725 -- 4.605.402.061.725 -- -- -- Ciawi - Sukabumi
Kayu Agung - Kayu Agung -
Palembang - Betung 3.076.660.137.454 -- -- 2.036.308.185.582 -- 5.112.968.323.036 Palembang - Betung
Pasuruan - Probolinggo 4.176.882.493.840 -- -- 9.912.706.899 -- 4.186.795.200.739 Pasuruan - Probolinggo
30.525.227.222.269 -- 4.605.402.061.725 2.968.893.932.854 -- 28.888.719.093.398
Aset Dalam Penyelesaian Construction in Progress
Ruas Jalan Tol : Toll Road Section :
Kayu Agung - Kayu Agung -
Palembang - Betung 14.675.937.968.667 104.355.195.019 -- (2.057.939.557.921) -- 12.722.353.605.765 Palembang - Betung
Ciawi - Sukabumi 2.647.682.620.355 23.140.219.117 2.670.952.598.642 129.759.170 -- -- Ciawi - Sukabumi
Pasuruan - Probolinggo 1.567.118.255.749 26.670.782.747 -- (9.912.706.899) -- 1.583.876.331.597 Pasuruan - Probolinggo
Krian-Legundi-Bunder 922.673.040.372 -- -- (922.673.040.372) -- -- Krian-Legundi-Bunder
19.813.411.885.143 154.166.196.883 2.670.952.598.642 (2.990.395.546.022) -- 14.306.229.937.362
Akumulasi Accumulated
Amortisasi Amortization
Ruas Jalan Tol : Toll Road Section :
Pemalang - Batang 417.658.072.164 23.561.696.289 -- -- -- 441.219.768.453 Pemalang - Batang
Kayu Agung - Kayu Agung -
Palembang - Betung 155.303.927.873 7.693.945.487 -- (21.631.372.338) -- 141.366.501.022 Palembang - Betung
Krian-Legundi-Bunder 149.220.618.082 17.166.893.258 -- -- -- 166.387.511.340 Krian-Legundi-Bunder
Ciawi - Sukabumi 156.264.753.776 3.101.926.454 159.496.439.400 129.759.170 -- -- Ciawi - Sukabumi
Pasuruan - Probolinggo 67.647.465.190 5.214.323.036 -- -- -- 72.861.788.226 Pasuruan - Probolinggo
946.094.837.085 56.738.784.524 159.496.439.400 (21.501.613.168) -- 821.835.569.041
Nilai Tercatat 49.392.544.270.327 42.373.113.461.719 Carrying Value
- 108 -
Page 106
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Desember 2023/ December 31, 2023
Saldo Awal/ Penambahan/ Pengurangan/ Reklasifikasi/ Penyesuaian/ Saldo Akhir/
Beginning Balance Additions Deductions Reclassification Adjustment Ending Balance
Rp Rp Rp Rp Rp Rp
Biaya Perolehan Acquisition Cost
Ruas Jalan Tol : Toll Road Section :
Krian-Legundi-Bunder 10.796.542.312.941 -- -- -- -- 10.796.542.312.941 Krian-Legundi-Bunder
Pemalang - Batang 7.869.740.216.309 -- -- -- -- 7.869.740.216.309 Pemalang - Batang
Ciawi - Sukabumi 4.605.402.061.725 -- -- -- -- 4.605.402.061.725 Ciawi - Sukabumi
Kayu Agung - -- Kayu Agung -
Palembang - Betung 3.076.660.137.454 -- -- -- -- 3.076.660.137.454 Palembang - Betung
Pasuruan - Probolinggo 4.176.882.493.840 -- -- -- -- 4.176.882.493.840 Pasuruan - Probolinggo
30.525.227.222.269 -- -- -- -- 30.525.227.222.269
Aset Dalam Penyelesaian Construction in Progress
Ruas Jalan Tol : Toll Road Section :
Kayu Agung - Kayu Agung -
Palembang - Betung 13.373.450.893.251 1.302.487.075.416 -- -- -- 14.675.937.968.667 Palembang - Betung
Ciawi - Sukabumi 2.182.608.557.843 465.074.062.512 -- -- -- 2.647.682.620.355 Ciawi - Sukabumi
Pasuruan - Probolinggo 1.189.424.872.407 377.693.383.342 -- -- -- 1.567.118.255.749 Pasuruan - Probolinggo
Krian-Legundi-Bunder 877.846.492.601 44.826.547.771 -- -- -- 922.673.040.372 Krian-Legundi-Bunder
17.623.330.816.102 2.190.081.069.041 -- -- -- 19.813.411.885.143
Akumulasi Accumulated
Amortisasi Amortization
Ruas Jalan Tol : Toll Road Section :
Pemalang - Batang 326.407.370.251 91.250.701.913 -- -- -- 417.658.072.164 Pemalang - Batang
Kayu Agung - Kayu Agung -
Palembang - Betung 58.643.526.581 96.660.401.292 -- -- -- 155.303.927.873 Palembang - Betung
Krian-Legundi-Bunder 81.913.759.242 67.306.858.840 -- -- -- 149.220.618.082 Krian-Legundi-Bunder
Ciawi - Sukabumi 115.412.148.619 40.852.605.157 -- -- -- 156.264.753.776 Ciawi - Sukabumi
Pasuruan - Probolinggo 49.577.922.636 18.069.542.554 -- -- -- 67.647.465.190 Pasuruan - Probolinggo
631.954.727.329 314.140.109.756 -- -- -- 946.094.837.085
Nilai Tercatat 47.516.603.311.042 49.392.544.270.327 Carrying Value
Aset dalam penyelesaian direklasifikasi menjadi Construction in progress reclassified as acquisition
biaya perolehan hak pengusahaan jalan tol ketika cost of toll road concession rights when toll road
masa konstruksi telah selesai dan mulai beroperasi. construction has completed and start operating.
Penyesuaian pada hak pengusahaan jalan tol Adjustment on toll road concession rights is due to
disebabkan oleh revaluasi hak pengusahaan jalan revaluation. Amortization expense of toll road
tol. Beban amortisasi hak pengusahaan jalan tol consession rights recorded in cost of revenues toll
dicatat sebagai beban pokok pendapatan jalan tol. road.
23. ASET KEUANGAN ATAS PROYEK KONSESI 23. FINANCIAL ASSETS FROM CONCESSION
PROJECT
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pembayaran Kapasitas Minimum di Masa Depan: Future Minimum Capacity Payment:
Tidak Lebih dari Satu Tahun 36.167.438.084 41.011.009.189 Not Later than One Year
Lebih dari Satu Tahun Tetapi Tidak Lebih Dari Lima Tahun 93.004.993.886 93.004.993.886 Later than One Year Later than Five Year
Lebih dari Lima Tahun 245.591.583.518 251.404.395.635 Later than Five Year
Jumlah Pembayaran Kapasitas Minimum di Masa Depan 374.764.015.488 385.420.398.710 Total Future Minimum Capacity Payments
Penurunan nilai aset keuangan 65.394.407.864 65.394.407.864 Impairment of Financial Assets
Pendapatan Keuangan yang Belum Diterima 73.077.418.368 75.872.667.474 Less Unearned Financial Income
Nilai Sekarang dari Pembayaran Kapasitas Masa Depan 236.292.189.256 244.153.323.372 Present Value of Future Capacity Payments
Dikurangi: Bagian yang Jatuh Tempo Dalam Satu Tahun 25.872.902.032 30.382.221.195 Current Portion
Bagian Jangka Panjang 210.419.287.224 213.771.102.177 Non-Current Portion
Akun ini merupakan piutang tidak lancar dari PLN This account represents non-current receivable
sehubungan dengan pembayaran kapasitas from PLN in relation to the future minimum
minimum masa depan yang tercantum dalam PPA capacity payments set forth in PPA that have been
yang telah diklasifikasikan sebagai aset keuangan classified as financial asset as a result of adoption
sebagai hasil penerapan ISAK 16. of ISAK 16.
Pada tanggal 9 Desember 2016, WSE memulai On December 9, 2016, WSE had its commercial
operasi komersial (COD) untuk proyek konsesi ini. operation date (COD) on this concession project. As
Pada 31 Maret 2024 dan 2023, WSE mengakui of March 31, 2024 and 2023, WSE recognized the
pendapatan konsesi masing-masing sebesar concession revenues amounting to Rp1,400,876,677
Rp1.400.876.677 dan Rp9.105.120.382. and Rp9,105,120,382 respectively.
- 109 -
Page 107
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Fasilitas pembangkit tenaga mini hidro (infrastruktur) Mini hydro power generating facility (infrastructure)
telah dijadikan jaminan untuk pinjaman jangka has been pledged as collateral for long-term loan
panjang dari pihak ketiga. from the third party.
24. UTANG USAHA 24. ACCOUNTS PAYABLE
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pemasok 2.763.260.599.114 2.819.775.554.465 Suppliers
Subkontraktor 2.286.359.304.228 2.025.736.828.081 Subcontractors
Sewa Alat 469.816.506.992 454.400.404.079 Rental Equipment
Upah Kerja 248.160.971.420 240.431.207.080 Wages
Lain-lain 149.437.078.499 120.876.687.924 Others
Jumlah 5.917.034.460.253 5.661.220.681.629 Total
Tidak ada bunga yang dibebankan pada utang usaha No interest is charged to the accounts payable due.
yang sudah jatuh tempo.
25. UTANG BANK JANGKA PENDEK 25. SHORT-TERM BANK LOANS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
Entitas Anak/ Subsidiary Entity - WKR
PT Bank Tabungan Negara (Persero) Tbk -- 20.504.115.167
Sub Jumlah/ Sub Total -- 20.504.115.167
Pihak Ketiga/ Third Parties
Entitas Anak/ Subsidiary Entity - WBP
PT Bank DKI 671.127.052.202 671.127.052.202
Entitas Anak/ Subsidiary Entity - WKR
PT BPR Inti Dana Sukses Makmur 29.000.000.000 29.000.000.000
Sub Jumlah/ Sub Total 700.127.052.202 700.127.052.202
Jumlah/ Total 700.127.052.202 720.631.167.369
WKR WKR
PT Bank Tabungan Negara (Persero) Tbk PT Bank Tabungan Negara (Persero) Tbk
Pada tanggal 21 Februari 2020, Perusahaan On February 21, 2020, the Company signed contract
menandatangani kontrak perjanjian No. 5 dengan PT agreement No. 5 with PT Bank Tabungan Negara
Bank Tabungan Negara (Persero) Tbk terkait dengan (Persero) Tbk regarding a revolving loan facility of
fasilitas pinjaman sebesar Rp100.000.000.000 Rp100,000,000,000. This loan facility is used for the
bersifat revolving. Fasilitas pinjaman ini digunakan distribution of Partnership Pattern Working Capital
untuk Penyaluran Pemberian Fasilitas Kredit Modal Credit Facilities with a loan facility term of 36 months
Kerja Pola Kemitraan dengan jangka waktu fasilitas after signing the contract agreement with an interest
pinjaman adalah 36 bulan setelah penandatanganan rate of 9.50% per year. The maximum credit facility
kontrak perjanjian dengan tingkat suku bunga 9,50% that can be provided to each Supplier is 60% of
per tahun. Maksimal fasilitas kredit yang dapat the contract value with a maximum total ceiling of
diberikan untuk setiap Supplier sebesar 60% dari nilai Rp10,000,000,000 with a period of 12 months for
kontrak dengan maksimal total plafond each facility withdrawal.
Rp10.000.000.000 dengan jangka waktu 12 bulan
untuk setiap penarikan fasilitas.
Saldo pokok terutang dari fasilitas ini sebesar Nihil The outstanding principal balance amounted nil and
dan Rp20.504.115.167 pada 31 Maret 2024 dan 31 Rp20,504,115,167 as of March 31, 2024 and
Desember 2023. December 31, 2023, respectively.
WBP WBP
PT Bank DKI PT Bank DKI
Berdasarkan Surat No. 936/SPPK/910/VI/2020 Based on Letter No. 936/SPPK/910/VI/2020 dated
tanggal 2 Juni 2020 mengenai Surat Pemberitahuan June 2, 2020, regarding Credit Approval Notification
- 110 -
Page 108
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Persetujuan Kredit (SPPK), telah disetujui Letter, it has been approved to increase the KMK
penambahan limit fasilitas KMK pinjaman Tetap Fixed Term Loan facility limit to Rp700,000,000,000
Berjangka menjadi Rp700.000.000.000 dan Sublimit and Sublimit Non-Cash Loan amounting to
Non-Cash Loan sebesar Rp300.000.000.000. Rp300,000,000,000. The loan period is until
Jangka waktu pinjaman sampai dengan June 15, 2021. The interest rate is at 9.50% per
15 Juni 2021. Suku bunga sebesar 9,50% per tahun. annum.
Pembatasan: Negative Convenant:
1. Mengalihkan hak atas agunan yang sudah 1. Transferring the right to collateral that has been
dijaminkan ke Bank DKI kepada pihak lain. pledged to Bank DKI to another party.
2. Mengikatkan diri sebagai penjamin hutang atau 2. Binding themselves as guarantor of debt or
menjaminkan harta kekayaan Perusahaan yang pledging the Company’s assets that have been
sudah dijaminkan ke Bank DKI kepada pihak lain. pledged to Bank DKI to other parties.
3. Mengalihkan/menyerahkan kepada pihak lain, 3. Transferring/surrending to other parties, in part or
sebagian atau seluruhnya atas hak dan in whole for rights and obligations arising in
kewajiban yang timbul berkaitan dengan fasilitas connection with Debtor credit facilities at Bank
kredit Debitur di Bank DKI. DKI.
Bank DKI pada tanggal 5 Juli 2022 mengajukan Bank DKI on July 5, 2022, filed a cassation to
kasasi kepada Mahkamah Agung Republik Indonesia the Supreme Court of the Republic of Indonesia with
dengan register perkara No. 1455 K/Pdt.Sus- case register No. 1455 K/Pdt.Sus-Pailit/2022
Pailit/2022 (“Permohonan Kasasi”) atas (“Cassation Application”) on the ratification
pengesahan (homologasi) Perjanjian Perdamaian (homologation) of the Reconciliation Agreement by
oleh Majelis Hakim pada Pengadilan Niaga pada the Panel of Judges at the Commercial Court at
Pengadilan Negeri Jakarta Pusat pada perkara the Central Jakarta District Court in case
No. 497/Pdt.Sus-PKPU/2021/PN.Niaga.Jkt.Pst No. 497/Pdt.Sus-PKPU/2021/PN.Niaga.Jkt.Pst
(“Perjanjian Perdamaian”). (“Reconciliation Agreement”).
Fasilitas pinjaman ini dijamin dengan piutang usaha This loan facility is colaterallized by trade receivable
atas proyek Pemerintah Republik Indonesia dengan from Government projects of the Republic of
nilai sebesar minimal Rp750.000.000.000. Indonesia with a minimum value of
Rp750,000,000,000.
Berdasarkan Memori Kasasi terhadap Putusan Based on the Memorandum of Cassation against
Pengesahan Perdamaian (Homologasi) Pengadilan the Commercial Court Ratification of Peace
Niaga pada Pengadilan Negeri Jakarta Pusat No. (Homologation) Decision at the Central Jakarta
497/PDT.SUS-PKPU/2021/PN.NIAGA/JKT. PST District Court No. 497/PDT.SUS/PKPU/
antara PT Bank DKI (Pemohon Kasasi) melawan 2021/PN.NIAGA/JKT.PST between PT Bank DKI
Perusahaan (dalam PKPU) (Termohon Kasasi) No. (the Petitioner for Cassation) and the Company (in
177/BDKI WSBP/DS-WS/VII/2022 tanggal 5 Juli PKPU) (Respondent for Cassation)
2022, PT Bank DKI sebagai pemohon kasasi No. 177/BDKIWSBP/DS-WS/VII/2022 dated July 5,
menyampaikan memori kasasi ke Mahkamah Agung 2022, PT Bank DKI as the applicant for cassation
RI melalui kepaniteraan Pengadilan Niaga pada submitted a memorandum of cassation to
Pengadilan Negeri Jakarta Pusat yaitu Permohonan the Supreme Court of the Republic of Indonesia
Pembatalan Putusan Pengesahan Perdamaian through the clerk of the Commercial Court at
(Homologasi) Perusahaan (dalam PKPU). the Central Jakarta District Court, namely
the Application for Cancellation Decision on
Ratification of Peace (Homologation) of
the Company (in PKPU).
Berdasarkan surat dari Pengadilan Negeri Based on a letter from the District Court Central
Jakarta Pusat Kelas I A Khusus Jakarta Class I A Special No. W10.U1/81/HT.02/I/
No. W10.U1/81/HT.02/I/2022.03.Hry tanggal 5 2022.03.Hry dated January 5, 2023, regarding
Januari 2023 perihal pemberitahuan dan the notification and submission of a copy of
penyampaian salinan putusan Mahkamah Agung RI the decision of the Supreme Court of the Republic of
No. 445/K/Pdt.SusPailit/2022.Jo.497/Pdt.Sus/PKPU/ Indonesia No.1445/K/Pdt.Sus-Pailit/2022.Jo.497/
2021/PN/Niaga.Jkt.Pst. Bahwa Mahkamah Agung RI Pdt.Sus/ PKPU/2021/PN Niaga. Jkt. Pst. Where
memutuskan menolak permohonan kasasi dari Para the Supreme Court of the Republic of Indonesia
Pemohon Kasasi PT Bank DKI. decided to reject the cassation petition from
the Cassation Appellant PT Bank DKI.
Berdasarkan surat dari PT Bank DKI Based on a letter from PT Bank DKI
No. 02/DIR/KKM/I/2023 tanggal 31 Januari 2023 No. 02/DIR/KKM/I/2023 dated January 31, 2023
- 111 -
Page 109
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
perihal Penyampaian Tenggat Waktu Pelaksanaan regarding Submission of the Deadline for
Restrukturisasi Kredit Diluar Perjanjian Perdamaian Implementation of Credit Restructuring Outside
setelah PKPU Berakhir, dimana PT Bank DKI the Peace Agreement after PKPU Ends, where
menghormati proses internal yang dilakukan WBP PT Bank DKI respects the internal processes carried
dalam pelaksanaan restrukturisasi kredit diluar out by WBP in implementing credit restructuring
Perjanjian Perdamaian, namun demikian outside the Settlement Agreement, however, due to
sehubungan dengan telah berlarut-larutnya proses ini the protracted nature of this process, we hope that
maka kami berharap WBP dapat melakukan WBP will be able to sign the Credit Agreement
penandatanganan Adendum Perjanjian Kredit Addendum with PT Bank DKI no later than February
dengan PT Bank DKI selambat lambatnya tanggal 17 17, 2023. If by the specified deadline the Company
Februari 2023. Apabila sampai dengan tenggat waktu cannot sign the Credit Agreement addendum, then
yang telah ditetapkan Perusahaan tidak dapat WBP credit facility will experience a decrease in credit
melakukan penandatanganan addendum Perjanjian quality where this will have an impact on
Kredit, maka atas fasilitas kredit Perusahaan akan the Company business credit facility at Bank DKI in
mengalami penurunan kualitas kredit dimana hal accordance with the credit provisions regarding one
tersebut akan berdampak pada fasilitas kredit induk obligor.
usaha Perusahaan yang ada di Bank DKI sesuai
dengan ketentuan perkreditan mengenai one obligor.
Berdasarkan Surat No 196/WBP/DIR/2023 tanggal Based on Letter No 196/WBP/DIR/2023
8 Februari 2023 perihal tanggapan atas surat dated February 8, 2023 regarding the response to
PT Bank DKI No 02/DIR/KKM/I/2023 tanggal PT Bank DKI's letter No 02/DIR/KKM/I/2023 dated
31 Januari 2023, secara prinsip WBP berkomitmen January 31, 2023, in principle WBP is committed to
untuk menyelesaikan kewajiban yang kami miliki fulfilling our obligations to PT Bank DKI as well as
kepada PT Bank DKI serta terbuka atas usulan Bank being open to Bank DKI's proposals while still paying
DKI dengan tetap memperhatikan aspek kepatuhan attention to compliance aspects and legal risks that
serta risiko-risiko hukum yang dapat timbul kepada may arise to WBP in connection with
WBP sehubungan dengan pelaksanaan usulan Bank the implementation of Bank DKI's proposals,
DKI, terutama atas potensi risiko gugatan especially regarding the potential risk of lawsuits
pembatalan Perjanjian Perdamaian yang berdampak canceling the Settlement Agreement which has an
merugikan seluruh kreditur termasuk Bank DKI dan adverse impact on all creditors including Bank DKI
WBP. WBP yakin bahwa pertimbangan WBP sejalan and WBP. WBP believes that WBP considerations
dengan Pendapat Hukum Bank DKI. Guna are in line with the Legal Opinion of Bank DKI. In order
mendapatkan kepastian bahwa pelaksanaan to obtain certainty that the implementation of credit
restrukturisasi kredit di kemudian hari tidak restructuring in the future does not pose risks as
menimbulkan risiko sebagaimana disampaikan stated in the Legal Opinion of Bank DKI and other
dalam Pendapat Hukum Bank DKI dan risiko hukum legal risks due to negligence in carrying out
lainnya akibat kelalaian melaksanakan Perjanjian the Settlement Agreement which has permanent
Perdamaian yang telah berkekuatan hukum tetap, legal force, then the Company believes that
maka WBP beranggapan bahwa usulan perubahan the proposal to change the Bank DKI Restructuring
Tranche Restrukturisasi Bank DKI yang semula Tranche which was originally Tranche B and Tranche
adalah Tranche B dan Tranche C menjadi Tranche A C to Tranche A can be accommodated by WBP by
dapat diakomodir WBP dengan terlebih dahulu first making a request to all creditors for Bank DKI's
melakukan permohonan kepada seluruh kreditur atas plan with reference to article 5.7 of
rencana Bank DKI dengan mengacu kepada the Settlement Agreement, namely "changes to
pasal 5.7 Perjanjian Perdamaian yaitu "perubahan the Settlement Agreement can only amended or
Perjanjian Perdamaian hanya dapat diubah atau amended based on a proposal or request from WBP,
diamandemen berdasarkan usulan atau permintaan provided that it is approved by 50% of
dari WBP, dengan catatan disetujui oleh 50% dari the total value of the Creditor's invoice that submits
total nilai tagihan Kreditur yang mengajukan tagihan the invoice in the PKPU process.
dalam proses PKPU.
Berdasarkan Perjanjian Perdamaian, penyelesaian According to the Composition Plan, debt settlement
utang Bank DKI akan diselesaikan melalui Golongan of Bank DKI shall be settled through Tranche B and
Tranche B dan Tranche C dari Perjanjian Perdamaian Tranche C of the Reconciliation Agreement as
sebagai berikut: follows:
Berdasarkan Nota Kesepahaman antara Based on the Memorandum of Understanding
PT Bank DKI dengan WBP, dengan Bank DKI between PT Bank DKI and the Company with
No. 09/MOU/DIR /II/2023 dan Perusahaan dengan Bank DKI No. 09/MOU/DIR/II/2023 and
No. 001/MOU/WBP /DIR/2023 tanggal No. WSBP 001/MOU/WBP/DIR/2023 dated February
21 Februari 2023, dengan ketentuan sebagai berikut: 21, 2023, with the following conditions:
- 112 -
Page 110
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
1. Tujuan Nota Kesepahaman adalah untuk 1. The purpose of the Memorandum of
terwujudnya pelaksanaan restrukturisasi fasilitas Understanding is to realize the implementation
kredit modal kerja Perusahaan sesuai of the restructuring of the Company’s working
Tranche A Perjanjian Perdamaian, setelah capital credit facility in accordance with Tranche
dilaksanakannya Addendum Perjanjian A of the Settlement Agreement, following
Perdamaian; the implementation of the Addendum to
the Settlement Agreement.
2. Setelah ditandatanganinya Nota Kesepahaman 2. After signing the Memorandum of
dan dipenuhi Persyaratan Adendum Perjanjian Understanding and fulfilling the Requirements
Perdamaian, maka Perusahaan akan for the Addendum to the Peace Agreement,
melanjutkan pembuatan dan penandatanganan the Company will continue to draw up and sign
Addendum Perjanjian Perdamaian; the Addendum to the Peace Agreement;
3. WBP akan mengirimkan surat pemberitahuan 3. WBP will send a written notification letter to all
tertulis kepada seluruh kreditur WBP WBP creditors (Written Notification Letter) no
(Surat Pemberitahuan Tertulis) selambat- later than 14 calendar days from the date this
lambatnya 14 hari kalender sejak tanggal Memorandum of Understanding was signed;
ditandatanganinya Nota Kesepahaman ini;
4. Setelah diterimanya tanggapan atas Surat 4. After receiving a response to the Written
Pemberitahuan Tertulis dari para kreditur WBP Notification Letter from the creditors of WBP
(Tanggapan Kreditur), maka Perusahaan wajib (Creditors Response), the Company is required
menyampaikan tanggapan kreditur kepada bank to submit the creditor's response to the bank no
selambat-lambatnya 5 hari kerja sejak tanggal later than 5 working days from the date of receipt
diterimanya Tanggapan Kreditur; of the Creditor's Response;
5. WBP upaya dan/atau terbaiknya Bank akan 5. The Company and/or the Bank will make their
untuk melakukan pelaksanaan best efforts so that the signing of the Addendum
penandatanganan Adendum Perjanjian to the Peace Agreement can be fulfilled;
Perdamaian dapat terpenuhi;
6. Nota kesepahaman berlaku dalam kurun waktu 6. This Memorandum of Understanding is valid
60 hari kalender sejak tanggal ditandatanganinya within 60 calendar days from the date this
Nota Kesepahaman ini oleh para pihak dan dapat Memorandum of Understanding was signed by
dilakukan perpanjangan berdasarkan the parties and can be extended based on
kesepakatan para pihak menjadi Tranche A; the agreement of the parties to be Tranche A;
7. Bank DKI dan WBP sepakat untuk tunduk pada 7. Bank DKI and WBP agree to comply with
ketentuan Pasal 5.7 Perjanjian Perdamaian yang the provisions of Article 5.7 of the Settlement
mengatur bahwa mekanisme addendum Agreement which stipulates that
Perjanjian Perdamaian harus dilakukan dengan the mechanism for the Addendum to the
mendapatkan persetujuan dari 50% dari total Settlement Agreement must be carried out by
nilai tagihan kreditur WBP yang mengajukan obtaining approval from 50% of the total value of
tagihan dalam proses PKPU. the WBP creditor's bill that submits a bill in the
PKPU process.
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As of March 31, 2024 and December 31, 2023, the
saldo pinjaman jangka pendek WBP kepada PT Bank balance of short-term loan of WBP to PT Bank DKI
DKI masing-masing sebesar Rp671.127.052.202. amounting to Rp671,127,052,202 respectively.
Berdasarkan Perjanjian Perdamaian dalam PKPU Based on the Reconciliation Agreement in PKPU this
fasilitas pinjaman ini direstrukturisasi menjadi Utang loan facility was restructured into Long-Term Bank
Bank Jangka Panjang. Pada tanggal 31 Maret 2024 Loans and. As of March 31, 2024 and December 31,
dan 31 Desember 2023, saldo pinjaman jangka 2023, the balance of long-term loan of WBP to
panjang WBP kepada PT Bank DKI masing-masing PT Bank DKI amounting to Rp110,842,053,876 and
sebesar Rp110.842.053.876 dan Rp111.019.443.140. Rp111,019,443,140 respectively.
WKR WKR
PT BPR Intidana Sukses Makmur PT BPR Intidana Sukses Makmur
Pada tanggal 28 Desember 2022, WKR On December 28, 2022, WKR obtained contract
menandatangani kontrak perjanjian No. agreement No. 0114/ISM-SME/SPPKKMKDL/1222
0114/ISMSME/-SPPK-KMKDL/1222 dengan PT BPR with PT BPR Intidana Sukses Makmur related to loan
Intidana Sukses Makmur terkait dengan fasilitas facility amounting to Rp15,000,000,000. This loan
pinjaman sebesar Rp15.000.000.000. Fasilitas facility is used as working capital with term 12 months
pinjaman ini merupakah fasilitas modal kerja dengan after signing of the contract with interest rate of
jangka waktu fasilitas pinjaman adalah 12 bulan dengan 16.00% per annum. The credit facilities are secured
- 113 -
Page 111
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
tingkat suku bunga 16,00% per tahun. Pinjaman by land square of 1.546 m2 located at project
tersebut dijamin dengan tanah seluas 1.546 m2 di lokasi development of Vasaka Solterra.
proyek pembangunan Vasaka Solterra.
Pada tanggal 28 Desember 2022, WKR On December 28, 2022, WKR obtained contract
menandatangani kontrak perjanjian No. 153 dengan agreement No. 153 with PT BPR Intidana Sukses
PT BPR Intidana Sukses Makmur terkait dengan Makmur related to loan facility amounting to
fasilitas pinjaman sebesar Rp10.000.000.000. Rp10,000,000,000. This loan facility is used as
Fasilitas pinjaman ini merupakah fasilitas modal working capital with term 12 months after signing of
kerjadengan jangka waktu fasilitas pinjaman adalah the contract with interest rate of 16.00% per annum.
12 bulan dengan tingkat suku bunga 16,00% per The credit facilities are secured by land located at
tahun. Pinjaman tersebut dijamin dengan tanah di project development of Vasaka Solterra.
lokasi proyek pembangunan Vasaka Solterra.
Pada tanggal 24 Februari 2023, WFPR On February 24, 2023, WFPR signed contract
menandatangani kontrak perjanjian No. 171 dengan agreement No. 171 with PT BPR Intidana Sukses
PT BPR Intidana Sukses Makmur terkait dengan Makmur regarding the Demand Loan loan facility
fasilitas pinjaman Demand Loan sebesar amounting to IDR5,000,000,000. This loan facility is
Rp5.000.000.000. Fasilitas pinjaman ini merupakah a working capital facility with a loan facility term of 12
fasilitas modal kerja dengan jangka waktu fasilitas months with an interest rate of 18.00% per year.
pinjaman adalah 12 bulan dengan tingkat suku bunga The loan is secured by land at the Vasaka Solterra
18,00% per tahun. Pinjaman tersebut dijamin dengan development project site.
tanah di lokasi proyek pembangunan Vasaka
Solterra.
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As of March 31, 2024 and December 31, 2023, the
saldo pinjaman Grup kepada PT BPR Intidana balance of loan of Group to PT BPR Intidana Sukses
Sukses Makmur masing-masing sebesar Makmur amounting to Rp29,000,000,000,
Rp29.000.000.000. respectively.
26. UTANG LEMBAGA KEUANGAN NON-BANK 26. LOANS FROM NON-BANK FINANCIAL
INSTITUTION
Jangka panjang Long-term
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
Entitas anak/ Subsidiary - WTR
PT Sarana Multi Infrastruktur (Persero) (SMI) - WTTR 1.745.237.916.074 1.695.772.353.844
PT Sarana Multi Infrastruktur (Persero) (SMI) - WBW 1.267.150.070.390 1.225.548.390.984
PT Sarana Multi Infrastruktur (Persero) (SMI) - WST 1.100.000.000.000 1.100.000.000.000
PT Sarana Multi Infrastruktur (Persero) (SMI) - PBTR 479.063.665.771 377.534.431.191
PT Sarana Multi Infrastruktur (Persero) (SMI) Unit Syariah - WTTR 285.536.734.675 287.001.025.622
Sub Jumlah/ Sub Total 4.876.988.386.910 4.685.856.201.641
Pihak Ketiga/ Third Parties
Entitas anak/ Subsidiary - WKR
PT Tez Capital Finance 36.990.682.353 39.302.600.000
Kospin Jasa 19.000.000.000 19.000.000.000
Entitas anak/ Subsidiary - WSE
PT Indonesia Infrastructure Finance (IIF) 85.937.399.424 88.538.510.782
Entitas anak/ Subsidiary - WTR
PT Indonesia Infrastructure Finance (IIF) - PBTR 1.045.934.172.495 1.026.332.972.304
Diskonto belum diamortisasi/ Unamortized discount (73.752.897.931) (73.752.897.931)
Sub Jumlah/ Sub Total 1.114.109.356.341 1.099.421.185.155
Jumlah/ Total 5.991.097.743.251 5.785.277.386.796
- Kredit Sindikasi - Syndication Loan
Waskita Trans Jawa Toll Road (WTTR) Waskita Trans Jawa Toll Road (WTTR)
Berdasarkan Akta Notaris No. 3 dan 4 pada Based on Notarial Deed No. 3 and 4 dated October
tanggal 5 Oktober 2018 oleh Efran Yuniarto 5, 2018, by Efran Yuniarto S.H., M.Kn., in Jakarta,
- 114 -
Page 112
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
S.H., M.Kn., Notaris di kota Jakarta, WTTR WTTR entered into Loan Syndication with PT
telah menandatangani perjanjian Kredit Sarana Multi Infrastruktur Unit Usaha Syariah and
Sindikasi dengan PT Sarana Multi Infrastruktur PT Sarana Multi Infrastruktur. Both non-bank
Unit Usaha Syariah dan PT Sarana Multi financial institutions are providing a credit facility
Infrastruktur. Kedua lembaga keuangan with a credit ceiling of Rp1,293,201,000,000. The
non bank tersebut memberikan fasilitas kredit facilities are provided for the development of
maksimum Rp1.293.201.000.000. Fasilitas Pasuruan-Probolinggo Toll Road.
pinjaman ini digunakan Perusahaan untuk dana
operasional pembangunan jalan tol Pasuruan-
Probolinggo.
Pinjaman ini dikenakan bunga sebesar 6,25% This loan bears interest 6.25% per annum for
per tahun untuk Tranche A2 dan 10,5% Tranche A2 and 10.5% per annum for Tranche B.
pertahun untuk Tranche B. Pada November As of November 2022, there are increased on
2022, terjadi kenaikan bunga menjadi 13% interest rate by 13% for Tranche A2 and for
untuk Tranche A2 dan untuk Tranche B naik Tranche B increased by 11.75% on December 31,
menjadi 11,75% pada Desember 2022. 2023.
Pada tanggal 31 Maret 2024 dan 31 Desember As at March 31, 2024 and December 31, 2023,
2023, saldo pinjaman kredit WTTR dari PT the balance of WTTR credit loan from
Sarana Multi Infrastruktur (Persero) PT Sarana Multi Infrastruktur (Persero) amounting
sebesar Rp1.745.237.916.074 dan to Rp1,745,237,916,074 and
Rp1.695.772.353.844. Rp1,695,772,353,844 respectively.
Pada tanggal 31 Maret 2024 dan 31 Desember As at March 31, 2024 and December 31, 2023,
2023, saldo pinjaman kredit WTTR kepada the balance of WTTR credit loan from
PT Sarana Multi Infrastruktur (Persero) - Unit PT Sarana Multi Infrastruktur (Persero) - Unit
Syariah adalah sebesar Rp285.536.734.675 Syariah amounting to Rp285,536,734,675 and
dan Rp287.001.025.622. Rp287,001,025,622 respectively.
WBW WBW
Berdasarkan akta perjanjian kredit sindikasi Based on the syndicated credit agreement deed
No. 53, tanggal 21 Desember 2018, WBW telah No. 53, dated December 21, 2018, WBW entered
menandatangani perjanjian Kredit Sindikasi into Loan Syndication with
dengan PT Sarana Multi Infrastruktur (Persero) PT Sarana Multi Infrastruktur (Persero), and other
dan lembaga keuangan bank lainnya. banking financial institution.
Sesuai keputusan kreditur sindikasi untuk In accordance with the decision of
partisipasi dalam pembiayaan sindikasi WBW the syndicated creditors for participation in
untuk keperluan kredit investasi pembiayaan syndicated financing of WBW for credit purposes
pembangunan dengan limit fasilitas kredit development financing investment with an
investasi sebesar Rp5.360.084.000.000 investment credit facility limit of
dengan jangka waktu maksimum 180 bulan Rp5,360,084,000,000 with a maximum period of
sejak Penandatangan perjanjian kredit 180 months from the signing of the credit
termasuk Grace Period dengan suku bunga agreement including the Grace Period with
masa konstruksi adalah Reference Rate+. the construction interest rate is the Reference
Rate+.
Margin eqv 10,50% untuk Tranche 1A dan 1B Margin eqv 10,50% untuk Tranche 1A dan 1B dan
dan Reference Rate+ Margin eqv 11,50% untuk Reference Rate+ Margin eqv 11,50% untuk
Tranche 1C dan 1D. Tranche 1C dan 1D.
Perjanjian ini telah mengalami perubahan The agreement has undergone a change in
berdasarkan perjanjian kredit sindikasi No. 39 the syndicated credit agreement No. 39 dated
tanggal 26 Februari 2019 di Jakarta dengan February 26, 2019 in Jakarta by agreeing with and
menyepakati dan menyetujui memasukkan agreeing to enter PT Bank Negara Indonesia
PT Bank Negara Indonesia (Persero) Tbk (Persero) Tbk as the new creditor in the credit
sebagai kreditur baru dalam perjanjian kredit agreement and the date of interest payment of
dan tanggal pembayaran bunga perjanjian the credit agreement for facilities of Tranche 1A
kredit untuk fasilitas Tranche 1A dan fasilitas and the facilities of Tranche 1B conducted on the
Tranche 1B dilakukan pada tanggal 25 pada 25th of each month as well as for facilities of the
tiap bulan serta untuk fasilitas Tranche 1C dan Tranche 1C and the Tranche 1D facilitiy on the
fasilitas Tranche 1D dilakukan pada tanggal 25 25th of each month.
setiap bulan.
- 115 -
Page 113
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Berdasarkan pemberitahuan pernyataan Based on the notice of the statement of
penundukan diri dari PT Bank Panin Indonesia the submission of PT Bank Panin Indonesia Tbk
Tbk sebagai pemberi tambahan pinjaman as an additional lender on August 23, 2019
tanggal 23 Agustus 2019 perihal pernyataan regarding the lender statement to submit to
pemberi pinjaman untuk tunduk pada seluruh the entire agreement document granting
dokumen perjanjian pemberian fasilitas the loan facility to debtor with the amount of
pinjaman kepada debitur dengan jumlah additional loan facility given is Rp750,000,000,000
fasilitas tambahan pinjaman yang diberikan and will be specifically allocated for facilities of
adalah sebesar Rp750.000.000.000 dan secara Tranche 1A and facilities of Tranche 1B.
khusus hanya akan dialokasikan untuk fasilitas
Tranche 1A dan fasilitas Tranche 1B.
Berdasarkan pemberitahuan pernyataan Based on the notice of the statement of
penundukan diri dari PT Bank Pembangunan the submission of PT Bank Pembangunan Daerah
Daerah Lampung sebagai pemberi tambahan Lampung as an additional lender on February 28,
pinjaman tanggal 28 Februari 2020 perihal 2020 regarding the lender statement to submit to
pernyataan pemberi pinjaman untuk the entire agreement document granting the loan
tunduk pada seluruh dokumen perjanjian facility to debtor with the amount of additional loan
pemberian fasilitas pinjaman kepada debitur facility given is Rp100,000,000,000 and will be
dengan jumlah fasilitas tambahan pinjaman specifically allocated for facilities for Tranche 1A
yang diberikan adalah sebesar and facilities of Tranche 1B.
Rp100.000.000.000 dan secara khusus hanya
akan dialokasikan untuk fasilitas Tranche 1A
dan fasilitas Tranche 1B.
Berdasarkan pemberitahuan pernyataan Based on the notice of the statement of
penundukan diri dari PT Bank ICBC Indonesia the submission of PT Bank ICBC Indonesia as an
sebagai pemberi tambahan pinjaman tanggal 8 additional lender on April 8, 2020 regarding
April 2020 perihal pernyataan pemberi the lender statement to submit to the entire
pinjaman untuk tunduk pada seluruh dokumen agreement document granting the loan facility to
perjanjian pemberian fasilitas pinjaman kepada debtor with the amount of additional loan facility
debitur dengan jumlah fasilitas tambahan given is Rp300,000,000,000 and will be
pinjaman yang diberikan adalah sebesar specifically allocated for facilities of Tranche 1A
Rp300.000.000.000 dan secara khusus hanya and facilities of Tranche 1B.
akan dialokasikan untuk fasilitas Tranche 1A
dan fasilitas Tranche 1B.
Pada tanggal 31 Maret 2023 dan As at March 31, 2024 and December 31, 2023,
31 Desember 2023, saldo pinjaman kredit the balance of WBW investment credit loan from
investasi WBW dari PT Sarana Multi PT Sarana Multi Infrastruktur (Persero)
Infrastruktur (Persero) masing-masing sebesar amounting to Rp922,522,827,094 respectively.
Rp922.522.827.094.
Pada tanggal 31 Maret 2024 dan 31 Desember As at March 31, 2024 and December 31, 2023,
2023, saldo pinjaman kredit IDC WBW dari PT the balance of WBW IDC credit loan from
Sarana Multi Infrastruktur (Persero) masing- PT Sarana Multi Infrastruktur (Persero) amounting
masing sebesar Rp344.627.243.296 dan to Rp344,627,243,296 and Rp303,025,563,890
Rp303.025.563.890. respectively.
Waskita Sriwjaya Tol (WST) Waskita Sriwijaya Tol (WST)
Berdasarkan Akta notaris No. 50 Nanette Based on Deed No. 50 of notary Nanette
Cahyanie, S.H., tanggal 27 Juni 2022 antara Cahyanie, S.H., dated June 27, 2022 WST entered
WST dengan PT Sarana Multi Infrastruktur into Financing Agreement with
(Persero) Tbk perihal Perjanjian Pembiayaan PT Sarana Multi Infrastruktur amounting
ke WST sebesar Rp2.900.000.000.000. Pada 7 Rp2,900,000,000,000. On November 7, 2022. This
November 2022. Pinjaman ini dikenakan bunga loan bears interest at JIBOR + margin with a
sebesar JIBOR + margin dengan jatuh tempo maturity of 15 years. This loan can be used by
selama 15 tahun. Pinjaman ini dapat digunakan WST for the completion of the KAPB toll road
oleh WST untuk penyelesaian proyek jalan tol project.
KAPB.
Fasilitas pembiayaan ini yang telah dibayarkan This financing facility that has been paid (Non -
(Non-Revolving). Jangka waktu untuk fasilitas Revolving). The time period for this financing
- 116 -
Page 114
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
pembiayaan ini adalah 15 Tahun terhitung sejak facility is 15 years from the signing of
penandatanganan Perjanjian Pembiayaan the financing agreement including the grace
termasuk Masa Tenggang. period.
Pada tanggal 31 Maret 2024 dan 31 Desember As of March 31, 2024 and December 31, 2023,
2023, saldo pinjaman kredit WST kepada PT the balance of WST credit loan from
Sarana Multi Infrastruktur (Persero) adalah PT Sarana Multi Infrastruktur (Persero) amounting
sebesar Rp1.100.000.000.000 to Rp1,100,000,000,000 respectively.
PBTR PBTR
Berdasarkan surat persetujuan perubahan Based on the approval letter for changes to
fasilitas kredit sindikasi No. SSK/3.2/4251, the syndicated credit facility No. SSK/3.2/4251,
PBTR menyetujui fasilitas kredit dari PT Sarana PBTR approved the credit facilities from
Multi Infrastruktur Syariah. Fasilitas tersebut PT Sarana Multi Infrastruktur Syariah. These
berupa fasilitas pembayaran kontraktor sebesar facilities are in the form of a contractor
Rp352.000.000.000 dan pembayaran Utang payment facility of Rp352,000,000,000 and
BLU dan biaya pemliharaan jalan tol payment of BLU Debt and toll road
sebesar Rp148.000.000.000 dengan jangka maintenance costs of Rp148,000,000,000 with
waktu hingga tahun 2038 dan tingkat bagi hasil a period of up to 2038 and profit-sharing rate of
sebesar Reference Rate + Margin. Reference Rate + Margin.
Berdasarkan surat No. SSK/3.2/4398 atas surat Based on letter No. SSK/3.2/4398 on
keputusan amandemen perjanjian kredit the decision letter on the amendment to
sindikasi PT Sarana Multi Infrastruktur the syndicated credit agreement, PT Sarana Multi
mendapatkan persetujuan dari Kreditur Infrastruktur obtained approval from
Sindikasi pada tanggal 28 Desember 2021 the Syndicated Creditors on December 28, 2021
jangka waktu maksimal 18 tahun. for a maximum period of 18 years.
- Fasilitas Pembiayaan: - Financing Facilities:
Tranche C: pembiayaan baru dari SMI Tranche C: new financing from SMI Syariah
Syariah untuk keperluan pembiayaan for investment purposes with
investasi dengan skema bagi hasil step up a step-up profitsharing scheme and partially
dan ditangguhkan sebagian. deferred.
- Suku Bunga/Bagi Hasil: - Interest Rate/ Profit Sharing:
Tranche C (SMI Syariah) Bagi hasil Tranche C (SMI Syariah) Tranche C profit
Tranche C adalah sebesar Reference Rate sharing is equal to Reference Rate + Margin
+ Margin dengan ketentuan sebagai with the following conditions: Reference rate +
berikut: Reference rate + margin, dengan margin, with the following settings:
pengaturan sebagai berikut:
a. Tahun 2021 - 2025: 9,5% per tahun. a. Year 2021 - 2025: 9.5% pa. part of:
dibayarkan sebagian sebesar:
- Tahun 2021 - 2024: 5% per tahun; - Year 2021 - 2024: 5% pa;
- Tahun 2024 - 2025: 6,25% per - Year 2024 - 2025: 6.25% pa.
tahun.
- Selisih dari total ekspektasi bagi - The difference from the total
hasil yang berlaku dan bagi hasil expected profit sharing and profit
yang dibayarkan Sebagian akan sharing distributed will be
menjad porsi kewajiban bagi hasil the applicable profit sharing
yang ditangguhkan, dan akan obligation and will start in 2027 - 2031
dibayarkan mulai tahun 2027 - from the date of
2031 sejak tanggal Perjanjian the Financing Agreement according
Pembiayaan sesuai jadwal to the installment schedule.
angsuran
a. Tahun 2026 - 2029: 10% per tahun; a. Years 2026 - 2029: 10% pa;
b. Tahun 2030: 11,3% per tahun. b. 2030: 11.3% Pa.
- Perjanjian pembiayaan. - Grace - Grace Period: Tranche C - 6 years
Period: Tranche C - 6 tahun sejak from the signing of the financing
credit agreement until October 2027.
- 117 -
Page 115
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
ditandatangani perjanjian kredit
pembiayaan hingga Oktober 2027;
- Masa Penarikan: Tranche C - 4 - Grace Period: Tranche C - 6 years
tahun sejak penandatangan from the signing of the financing
perjanjian pembiayaan atau sesuai credit agreement until October 2027.
pembayaran utang BLU, dipilih
mana yang lebih dahulu terjadi.
- Grace Period: Tranche C - 6 tahun - Grace Period: Tranche C - 6 years
sejak ditandatangani perjanjian from the signing of the financing
kredit pembiayaan hingga Oktober credit agreement until October 2027.
2027.
- Masa Penarikan: Tranche C - 4 - Withdrawal Period: Tranche C - 4
tahun sejak penandatangan years from the signing of
perjanjian pembiayaan atau sesuai the financing agreement or
pembayaran utang BLU, dipilih according to the payment of BLU
mana yang lebih dahulu terjadi. debt, whichever occurs first.
Pada tanggal 31 Maret 2024 dan 31 Desember As at March 31, 2024 and December 31, 2023,
2023, saldo pinjaman kredit PBTR dari PT the balance of PBTR credit loan from
Sarana Multi Infrastruktur (Persero) adalah PT Sarana Multi Infrastruktur (Persero)
sebesar Rp479.063.665.771 dan amounting to Rp479,063,665,771 and
Rp377.534.431.191. Rp377,534,431,191 respectively.
WKR WKR
• PT Tez Capital Finance • PT Tez Capital Finance
Pada tanggal 15 November 2022, WKR On November 15, 2022, WKR entered into a
menandatangani kontrak perjanjian No. 8 contract agreement No. 8 with PT Tez Capital
dengan PT Tez Capital Finance terkait Finance related to loan facility amounting to
dengan fasilitas pinjaman sebesar Rp30,000,000,000. This loan facility will be
Rp30.000.000.000. Fasilitas pinjaman ini used specifically for working capital with term
hanya dapat digunakan untuk modal kerja of 12 months and interest rate of 20.00% per
dengan jangka waktu 12 bulan dan tingkat annum. As of the reporting date, this loan is
suku bunga 20,00% per tahun. Sampai still in the process of being extended.
dengan tanggal pelaporan, Pinjaman ini
masih dalam proses perpanjangan.
Pinjaman tersebut dijamin dengan sertifkat The credit facilities are secured by building rights
hak guna bangunan No. 00305/Batubulan, title located at No. 00305/Batubulan, Sukawati,
Sukawati, Gianyar, Bali seluas 26.211 m2. Gianyar, Bali with an area of 26,211 m2.
Fasilitas ini mensyaratkan Perusahaan These facilities require the Company to
untuk memelihara rasio keuangan sebagai maintain financial ratios as follows:
berikut:
a. Current ratio > 1x; a. Current ratio at > 1x;
b. Debt to equity ratio < 5x; b. Debt to equity ratio < 5x;
c. Rasio modal disetor terhadap total utang c. Ratio from fully paid capital to total
min 10%. bank loan min 10%.
Pada tanggal 31 Maret 2024 dan 31 As at March 31, 2024 and December 31,
Desember 2023, saldo pinjaman kredit 2023, WKR credit loan balances from PT Tez
WKR dari PT Tez Capital Finance masing- Capital Finance amounting to
masing sebesar Rp36.990.682.353 and Rp36,990,682,353 and Rp39,302,600,000
Rp39.302.600.000. respectively.
• Koperasi Simpan Pinjam Jasa • Koperasi Simpan Pinjam Jasa
Pada tanggal 12 Mei 2023, Entitas On May 12, 2023, the Company entered debt
menandatangani perjanjian No. 86 dengan agreement No. 86 with Koperasi Simpan
Koperasi Simpan Pinjam Jasa terkait Pinjam Jasa related to loan facility amounting
dengan fasilitas pinjaman sebesar to Rp19,000,000,000. This loan facility will be
Rp19.000.000.000. Fasilitas pinjaman ini used specifically for working capital with term
- 118 -
Page 116
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
hanya dapat digunakan untuk modal kerja of 3 months and interest rate of 11.00% per
dengan jangka waktu 3 bulan dan tingkat annum.
suku bunga 11,00% per tahun.
Perjanjian ini telah addendum tanggal 11 This aggrement has amandment on August
Agustus 2023 pada perjanjian kredit No. 92, 11, 2023 based on contract aggrement
WKR memperoleh persetujuan No. 92, WKR obtained approval for extension
perpanjangan periode fasilitas dengan of the facility periods with
jatuh tempo 11 November 2023. Sampai a maturity date till November 11, 2023. As of
dengan tanggal pelaporan, Pinjaman ini the reporting date, this loan is still in
masih dalam proses perpanjangan. the process of being extended.
Pada tanggal 31 Maret 2024 dan As at March 31, 2024 and December 31,
31 Desember 2023, saldo pinjaman kredit 2023, WKR credit loan balances from
WKR dari Koperasi Simpan Pinjam Jasa Koperasi Simpan Pinjam Jasa amounting to
masing-masing sebesar Rp19.000.000.000. Rp19,000,000,000 respectively.
WSE WSE
• PT Indonesia Infrastructure Finance (IIF) • PT Indonesia Infrastructure Finance (IIF)
Pada tanggal 8 Maret 2016, WSE On March 8, 2016, WSE obtained a long-term
memperoleh fasilitas pinjaman berjangka loan facility from IIF amounting to
panjang dari IIF sejumlah Rp175,000,000,000 which consists of
Rp175.000.000.000 yang terdiri dari Investment Credit facility and Interest During
fasilitas Kredit Investasi (KI) dan Interest Construction (IDC) facility amounting to
During Construction (IDC) sebesar Rp10,400,000,000.
Rp10.400.000.000.
Pinjaman ini dibayarkan secara cicilan The loan is paid in installments until December
sampai dengan bulan Desember 2026 2026 with grace period of 12 months. This
dengan masa tenggang 12 bulan. Fasilitas senior term loan facility was obtained by WSE
pinjaman berjangka senior ini diperoleh to finance the construction of 2X5 MW mini-
WSE untuk pembiayaan proyek hydro power plant with interest rate of 9.5%
pembangunan pembangkit listrik tenaga per year. WSE appointed PT Bank Negara
mini hydro 2X5 MW dengan tingkat bunga Indonesia (Persero) Tbk as a guarantee
per tahun sebesar 9,5%. WSE menunjuk agent.
PT Bank Negara Indonesia (Persero) Tbk
sebagai agen jaminan.
Pinjaman tersebut diatas dijamin dengan The loan is collateralized with accounts
piutang usaha dan aset tetap termasuk receivable and property and equipment
fasilitas pembangkit listrik tenaga hidro including minihydro power generating facility
(infrastruktur). (infrastructure).
Perjanjian pinjaman mencakup persyaratan The loan agreements include certain
tertentu yang mengharuskan WSE requirements for WSE to maintain certain
mempertahankan rasio keuangan tertentu financial ratios calculated based on
yang dihitung berdasarkan laporan keuangan the consolidated financial statements and
konsolidasian dan persyaratan lainnya. other requirements.
Pada tanggal 31 Maret 2024 dan 31 As of March 31, 2024 and December 31,
Desember 2023, WSE sudah memakai 2023, the balance of WSE Loan Facilities
Fasilitas pinjaman tersebut masing - amounting to Rp85,937,399,424 and
masing sebesar Rp85.937.399.424 dan Rp88,538,510,782 respectively.
Rp88.538.510.782.
PBTR PBTR
Berdasarkan Akta Notaris No. 23 tanggal Based on Notarial Deed No.23 dated October 23,
23 Oktober 2019 oleh Ariani Lakhsmijati Rachim, 2019 by Ariani Lakhsmijati Rachim S.H., Notary in
S.H., Notaris di Jakarta, PBTR dan Indonesia Jakarta, PBTR and Indonesia Infrastruture
Infrastruture Finance mengadakan perjanjian Finance entered into a Cash Deficiency Support
fasilitas Cash Deficiency Support (CDS) dengan (CDS) facility agreement with a total credit
- 119 -
Page 117
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
jumlah fasilitas kredit sebesar facility amounting to Rp600,000,000,000. This
Rp600.000.000.000. Fasilitas kredit ini dikenakan credit facility bears interest of LPS + 6.75% per
bunga sebesar LPS + 6,75% per tahun. Dari annum. From the interest rate, the Company is
tingkat suku bunga, Perusahaan wajib required to pay 3% per annum from the debit
membayarkan sebesar 3% per tahun dari baki balance. The unpaid interest rate is LPS + 3.75%
debet. Adapun tingkat suku bunga yang belum per annum on the debit balance, payment will be
dibayarkan sebesar LPS + 3,75% per tahun atas deferred and subject to compound interest at
saldo debet, akan ditangguhkan pembayarannya the interest rate calculated on each interest
dan dikenakan bunga majemuk sebesar tingkat payment date until the Syndicated Credit facility is
suku bunga yang dihitung pada setiap tanggal paid off. In 2020, the Company has drawn down
pembayaran bunga sampai dengan fasilitas the entire facility ceiling amounting to
Kredit Sindikasi lunas. Pada tahun 2020, Rp600,000,000,000.
Perusahaan telah menarik seluruh plafon fasilitas
sebesar Rp600.000.000.000.
Pada tanggal 31 Maret 2024 dan 31 Desember As of March 31, 2024 and December 31, 2023, the
2023, saldo pinjaman kredit investasi PBTR dari PBTR investment credit loan balances from IIF
IIF masing masing sebesar Rp1.045.934.172.495 amounting to Rp1,045,934,172,495 and
dan Rp1.026.332.972.304. Rp1,026,332,972,304 respectively.
27. UTANG BRUTO SUBKONTRAKTOR 27. GROSS AMOUNT DUE TO SUBCONTRACTORS
Utang bruto subkontraktor merupakan utang kerja Gross amount due to subcontractors represents
subkontraktor yang belum diberita acarakan, baik payable for uncertified subcontractor’s working
dari subkontraktor atau material yang diakui sebagai progress, either from subcontractor or materials which
prestasi karena belum memenuhi syarat pembayaran are recognized as progress but have not fulfilled certain
sesuai kontrak. payment condition as stated in the contract.
Rincian utang bruto subkontraktor jangka pendek The details of short-term gross amount due to
berdasarkan unit kerja adalah sebagai berikut: subcontractors based on business units are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Perusahaan/ The Company
Divisi Gedung/ Division Building - Jakarta 478.104.135.176 456.696.569.903
Divisi Infrastruktur II/ Division Infrastructure II - Jakarta 245.692.430.698 234.757.986.207
Divisi Infrastruktur III/ Division Infrastructure III - Jakarta 23.782.789.003 157.038.221.501
Divisi Infrastruktur I/ Division Infrastructure I - Jakarta 155.396.959.147 149.202.191.216
Divisi Overseas/ Division Overseas - Jakarta 1.396.810.273 3.485.272.976
Sub Jumlah/ Sub-Total 904.373.124.297 1.001.180.241.803
Entitas Anak/ Subsidiary
PT Waskita Beton Precast Tbk 182.514.377.124 201.746.143.353
PT Waskita Karya Realty 32.333.986.527 32.526.744.384
PT Waskita Karya Infrastruktur 2.958.739.480 3.040.123.510
Sub Jumlah/ Sub-Total 217.807.103.131 237.313.011.247
Jumlah/ Total 1.122.180.227.428 1.238.493.253.050
Rincian utang bruto subkontraktor jangka panjang The details of long-term gross amount due to
adalah sebagai berikut: subcontractors are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Perusahaan/ The Company
Divisi Infrastruktur II/ Division Infrastructure II - Jakarta 274.420.505.535 242.207.272.912
Divisi Infrastruktur III/ Division Infrastructure III - Jakarta 98.284.439.611 103.052.200.565
Divisi Gedung/ Division Building - Jakarta 48.012.782.169 51.415.219.794
Divisi Infrastruktur I/ Division Infrastructure I - Jakarta 52.300.232.554 50.541.407.606
Divisi Luar Negeri/ Division Overseas - Jakarta 2.591.590.182 2.004.015.988
Jumlah/ Total \ 475.609.550.051 449.220.116.865
- 120 -
Page 118
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
28. UANG MUKA KONTRAK JANGKA PENDEK 28. ADVANCES ON SHORT-TERM CONTRACS
Uang muka kontrak jangka pendek merupakan uang Advances on short-term contracts represents
muka pelaksanaan proyek yang diterima dari pemberi advance received from the owners of projects on
kerja sesuai kontrak pekerjaan konstruksi jangka short-term construction contracts. The advances will
pendek; uang muka tersebut akan dikompensasikan be offset with the progress of work and terms of
dengan progress pekerjaan dan termin pembayaran payment in accordance with the progress of work.
sesuai dengan progress lapangan.
Rincian uang muka kontrak jangka pendek The details of advances on short-term contracts
berdasarkan unit kerja adalah sebagai berikut: based on business unit are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Perusahaan/ The Company
Divisi Gedung/ Division Building - Jakarta 388.343.607.729 357.866.918.439
Divisi Infrastruktur I/ Division Infrastructure I - Jakarta (1.440.631.950) 97.274.918
Divisi Infrastruktur II/ Division Infrastructure II - Jakarta 196.981.383.312 31.958.529.486
Divisi Infrastruktur III/ Division Infrastructure III - Jakarta 9.159.764.152 15.104.297.269
Sub Jumlah/ Sub-Total 593.044.123.243 405.027.020.112
Entitas Anak/ Subsidiaries
PT Waskita Karya Realty 343.686.852.582 345.765.030.415
PT Waskita Beton Precast Tbk 106.129.079.251 77.693.454.704
PT Waskita Karya Infrastruktur 6.088.145.596 8.085.405.137
Sub Jumlah/ Sub-Total 455.904.077.429 431.543.890.256
Jumlah/ Total 1.048.948.200.672 836.570.910.368
Uang muka kontrak jangka pendek berdasarkan Advances on short-term contracts based on the
pihak - pihak pemberi kerja sebagai berikut: owners of the projects are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
PT Trans Jabar Tol 169.075.989.099 --
PT Patra Jasa 8.363.805.407 12.652.378.380
Sub Jumlah/ Sub-Total 177.439.794.506 12.652.378.380
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 338.205.439.245 312.437.419.157
Kedutaan Besar India/ Embassy of India 33.420.318.900 --
Tokyu Construction Co Ltd 18.154.603.586 20.065.685.032
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 481.728.044.435 491.415.427.799
Sub Jumlah/ Sub-Total 871.508.406.166 823.918.531.988
Jumlah/ Total 1.048.948.200.672 836.570.910.368
Uang muka pada WKR, entitas anak, merupakan Advances to WKR, a subsidiary, represent advances
uang muka yang diterima atas hasil penjualan unit received from the sale of apartment units.
apartemen.
Uang muka pada WBP, entitas anak, merupakan Advances to WBP, a subsidiary, represent advances
uang muka yang diterima atas pesanan beton precast received on precast concrete orders from customers.
dari pelanggan.
Uang muka pada WKI, entitas anak, merupakan uang Advances to WKI, a subsidiary, represent advances
muka yang diterima atas hasil penjualan baja. received from the sale of steel.
29. BIAYA YANG MASIH HARUS DIBAYAR 29. ACCRUED EXPENSE
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Beban Bunga 1.703.080.861.614 1.459.724.383.786 Interest Expenses
Beban Bunga Obligasi 754.136.478.332 616.388.363.813 Bond Interest Expenses
Beban Umum 655.364.285.829 706.426.841.050 General Expenses
Beban Pegawai 61.409.671.098 102.141.678.925 Employee Expenses
- 121 -
Page 119
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Utang Bagi Hasil 10.866.732.917 10.866.732.917 Profit Sharing Payables
Beban Kantor 7.408.883.819 10.129.816.679 Office Expenses
Beban Gedung 4.582.927.765 4.439.775.408 Building Expenses
Beban Operasional Proyek 768.128.814 1.405.882.234 Project Operational Charges
Lain-lain 80.370.647.184 414.895.840.803 Others
Jumlah 3.277.988.617.372 3.326.419.315.615 Total
Biaya yang masih harus dibayar untuk beban Accrued expenses for projects operational charges
operasional proyek adalah utang kepada pihak ketiga represent payables to third parties in line with the project
sehubungan dengan kegiatan operasional proyek operations of the Group are for building expenses, office
Perusahaan, beban gedung, beban kantor, beban expenses, employee expense and general expenses.
pegawai dan beban umum.
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As of March 31, 2024 and December 31, 2023, accrued
beban bunga obligasi yang masih harus dibayar bonds interest expenses represent interest expenses on
merupakan beban bunga atas obligasi Perusahaan the Group’s bonds that were not yet paid as follows:
yang belum dibayar sebagai berikut:
• Obligasi tahun 2018 Berkelanjutan III Tahap II • Bonds year 2018 Shelf III Phase II Tranche B;
Seri B;
• Obligasi tahun 2018 Berkelanjutan III Tahap III • Bonds year 2018 Shelf III Phase III Tranche B;
Seri B;
• Obligasi tahun 2019 Berkelanjutan III Tahap IV; • Bonds year 2019 Shelf III Phase IV;
• Obligasi tahun 2020 Berkelanjutan IV Tahap I; • Bonds year 2020 Shelf IV Phase I;
• Obligasi III tahun 2021; • Bonds III year 2021;
• Obligasi IV tahun 2022; • Bonds IV year 2022;
• Obligasi tahun 2019 Berkelanjutan I Tahap I • Bonds year 2019 Shelf I Phase I
(Entitas Anak - PT Waskita Beton Precast Tbk); (Subsidiaries - PT Waskita Beton Precast Tbk); and
dan
• Obligasi tahun 2019 Berkelanjutan I Tahap II • Bonds year 2019 Shelf I Phase II
(Entitas Anak - PT Waskita Beton Precast Tbk). (Subsidiaries - PT Waskita Beton Precast Tbk).
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As of March 31, 2024 and December 31, 2023,
bagi hasil yang masih harus dibayar merupakan bagi accrued profit sharing payables represent profit
hasil atas sukuk Perusahaan yang belum dibayar sharing on the Company’s sukuk that were not yet
sebagai berikut: paid as follows:
• Sukuk Mudharabah I tahun 2022. • Sukuk Mudharabah I year 2022.
30. SURAT UTANG JANGKA MENENGAH 30. MEDIUM TERM NOTES
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Surat Utang Jangka Menengah Medium Term Notes
PT Waskita Karya Realty 750.569.423.217 735.727.511.026 PT Waskita Karya Realty
Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun (250.000.000.000) (250.000.000.000) Less: Short-Term
Jumlah 500.569.423.217 485.727.511.026 Total
PT Waskita Karya Realty (WKR) PT Waskita Karya Realty (WKR)
Pada tanggal 24 Agustus 2022, WKR On August 24, 2022, WKR entered into contract
menandatangani kontrak perjanjian No. 17 untuk agreement No. 17 to issue Medium Term Notes III
menerbitkan Surat Utang Jangka Menengah Waskita Karya Realty Tahun 2022 with facility
(Medium Term Notes III Waskita Karya Realty Tahun amounting to Rp475,000,000,000. This loan facility
2022) dengan fasilitas pinjaman sebesar bears 12.1% annual interest rate. This loan facility will
Rp475.000.000.000. Fasilitas pinjaman ini diterbitkan be used for working capital and/or refinancing of debt.
dengan tingkat bunga 12,1% per tahun. Fasilitas The issuance of Medium Term Notes was rated by PT
peminjaman ini digunakan untuk modal kerja dan/ Pemeringkat Efek Indonesia with BB (idn) rate. The
atau pembayaran kembali utang usaha. Penerbitan term of this loan facilty is 36 months.
Surat Utang Jangka menengah ini memperoleh hasil
- 122 -
Page 120
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
pemeringkatan dari PT Pemeringkat Efek Indonesia
dengan peringkat BB (idn). Jangka waktu fasilitas
pinjaman adalah 36 bulan.
Pada tanggal 8 Juli 2022, WKR menandatangani On July 8, 2022, WKR entered into contract
kontrak perjanjian No. 05 untuk menerbitkan Surat agreement No. 05 to issue Medium Term Notes IV
Utang Jangka Menengah (Medium Term Notes IV Waskita Karya Realty Tahun 2022 with facility
Waskita Karya Realty Tahun 2022) dengan fasilitas amounting to Rp85,000,000,000. This loan facility
pinjaman sebesar Rp85.000.000.000. Fasilitas bears 11.41% annual interest rate. This loan facility
pinjaman ini diterbitkan dengan tingkat bunga will be used for working capital and/or refinancing of
11,41% per tahun. Fasilitas peminjaman ini Medium Term Notes PT Waskita Realty Tahun 2021.
digunakan untuk modal kerja dan/atau pembayaran The issuance of Medium-Term Notes was rated by
kembali Medium Term Notes PT Waskita Realty PT Pemeringkat Efek Indonesia with BB (idn) rate.
Tahun 2021. Penerbitan Surat Utang Jangka The term of this loan facility is 370 days.
menengah ini memperoleh hasil pemeringkatan dari
PT Pemeringkat Efek Indonesia dengan peringkat BB
(idn). Jangka waktu fasilitas pinjaman adalah 370
hari.
Pada tanggal 4 Juni 2021, WKR menandatangani On June 4, 2021, WKR entered into contract
kontrak perjanjian No. 07 untuk menerbitkan Surat agreement No. 07 to issue Medium Term Notes
Utang Jangka Menengah (MTN) dengan fasilitas (MTN) with facility amounting to Rp85,000,000,000.
pinjaman sebesar Rp85.000.000.000. Fasilitas This loan facility bears 10% annual interest rate. This
pinjaman ini diterbitkan dengan tingkat bunga 10% loan facility will be used for working capital and/or
per tahun. Fasilitas peminjaman ini digunakan untuk refinancing of debt. The issueance of debt get rated
modal kerja dan/ atau pembayaran kembali utang from PT Pemeringkat Efek Indonesia with BB+ (idn)
usaha. Penerbitan MTN ini memperoleh hasil rate.
pemeringkatan dari PT Pemeringkat Efek Indonesia
dengan peringkat BB+ (idn).
Fasilitas ini telah di addendum tanggal 16 agustus This facility was added to the August 16, 2022
2023 pada Perjanjian Medium Term Notes IV Waskita Medium Term Notes IV Waskita Karya Realty
Karya Realty tahun 2022 yang memperoleh Agreement which received approval for an extension
persetujuan perpanjangan periode fasilitas dengan of the facility period with a maturity date of 28 August
jatuh tempo 28 Agustus 2024 dengan tingkat suku 2024 with an interest rate of 11.41%.
bunga 11,41%.
WKR telah menunjuk Wali Amanat sebagai perantara WKR engaged Trustees to act as the intermediary
WKR dengan pemegang MTN. Adapun wali amanat between WKR and MTN holders. The Trustees for
untuk MTN adalah PT Bank Pembangunan Daerah MTN issuance is PT Bank Pembangunan Daerah
Jawa Barat (Persero) Tbk. Jawa Barat (Persero) Tbk.
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As of March 31, 2024 and December 31, 2023, the
surat utang jangka menengah WKR masing masing WKR Medium Term Notes amounting to
sebesar Rp750.569.423.217 dan Rp750,569,423,217 and Rp735,727,511,026,
Rp735.727.511.026. respectively.
PT Waskita Fim Perkasa Realti (WFPR) PT Waskita Fim Perkasa Realti (WFPR)
Pada tanggal 8 Juli 2022, WFPR menandatangani On July 8, 2022, the Company entered into contract
kontrak perjanjian No. 07 untuk menerbitkan Surat agreement No. 07 to issue Medium Term Notes II
Utang Jangka Menengah (Medium Term Notes II Waskita Fim Perkasa Realti Year 2022 with facility
Waskita Fim Perkasa Realti Tahun 2022) dengan amounting to Rp165,000,000,000. This loan facility
fasilitas pinjaman sebesar Rp165.000.000.000. bears 13.06% annual interest rate.
Fasilitas pinjaman ini dikenakan tingkat bunga
tahunan sebesar 13,06%.
Fasilitas peminjaman ini digunakan untuk refinancing This loan facility will be used for refinancing of
Medium Term Notes PT Waskita Fim Perkasa Realti Medium Term Notes PT Waskita Fim Perkasa Realti
Tahun 2021. Penerbitan Surat Utang Jangka Year 2021. The issuance of Medium Term Notes was
menengah ini memperoleh hasil pemeringkatan dari rated by PT Pemeringkat Efek Indonesia with BB (idn)
PT Pemeringkat Efek Indonesia dengan peringkat BB rate. The term of this loan facilty is 370 days. This
(idn). Jangka waktu fasilitas pinjaman adalah 370 facility has amendment on August 16, 2023 based on
hari. Fasilitas ini telah di addendum tanggal 16 Medium Term Notes II Waskita Fim Perkasa Realti
Agustus 2023 pada perjanjian Medium Term Notes II Tahun 2022 obtained approval for extension of the
- 123 -
Page 121
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Waskita Fim Perkasa Realti Tahun 2022 yang facility periods with a maturity date on August 25,
memperoleh persetujuan perpanjangan 2024 with interest rate 13.06% per annum.
perpanjangan periode fasilitas dengan jatuh tempo
25 Agustus 2024 dengan tingkat suku bunga 13,06%
per tahun.
WFPR telah menunjuk Wali Amanat sebagai WFPR engaged Trustees to act as the intermediary
perantara WFPR dengan pemegang MTN. Adapun between WFPR and MTN holders. The Trustees for
wali amanat untuk MTN adalah PT Bank MTN issuance is PT Bank Pembangunan Daerah
Pembangunan Daerah Jawa Barat (Persero) Tbk. Jawa Barat (Persero) Tbk.
Berdasarkan syarat-syarat dan kondisi-kondisi dari Under the terms and conditions of these long-term
perjanjian sehubungan dengan kewajiban jangka obligation, WKR are subjects to various covenants as
panjang tersebut, WKR harus mematuhi pembatasan follow as obtaining debt with new issuance of debts
antara lain memperoleh pinjaman dengan cara with others method which is have senior level than
penerbitan utang baru dengan cara lainnya yang MTN before issuance of MTN, guarantee and make
mempunyai batasan lebih tinggi dari penerbitan MTN expense from assets within 50% from total asset of
sebelum adanya MTN, menjamin atau membebani WKR, issued guarantee of WKR except concerned of
aset WKR lebih besar dari 50% dari total aset WKR, WKR and subsidiary operation, mergers and
memberikan jaminan WKR kecuali untuk kegiatan acquisition with others Company which have a bad
usaha dan anak WKR, melakukan penggabungan, influence to going concern, change majority
pengambilalihan dengan WKR lain yang mempunyai composition, sell and disposal of fixed asset more
dampak negatif terhadap kelangsungan usaha, than 50% from total asset within 1 current year period,
merubah komposisi pemegang saham mayoritas, giving another loan to other third parties except
menjual atau mengalihkan aset tetap WKR sebanyak regarding to business facility development,
lebih dari 50% dari total aset dalam 1 tahun periode employees loan, and cooperation, changing main
berjalan, memberikan pinjaman kepada pihak lain business activity, and reducing of authorized, issued,
kecuali berkaitan dengan sehubungan pembangunan and fully paid capital of WKR.
fasilitas usaha, pinjaman karyawan, dan koperasi,
mengubah bentuk usaha WKR, dan mengurangi
modal dasar, ditempatkan dan modal dasar WKR.
31. UTANG OBLIGASI - BERSIH DAN SUKUK 31. BOND PAYABLE - NET AND SUKUK
MUDHARABAH MUDHARABAH
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Nominal 8.849.305.499.849 8.844.766.761.482 Face Value
Biaya Emisi Obligasi (25.688.628.397) (25.688.628.397) Bond Issuance Cost
Akumulasi Amortisasi 10.189.662.369 9.546.800.046 Accumulated Amortization
Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun (4.715.500.000.000) (4.715.500.000.000) Less: Current Maturity
Bagian Jangka Panjang 4.118.306.533.821 4.113.124.933.131 Non - Current Portion
Sukuk Mudharabah 1.148.100.000.000 1.148.100.000.000 Sukuk Mudharabah
Biaya Emisi Sukuk Mudharabah (3.336.771.580) (3.336.771.580) Sukuk Mudharabah Issuance Cost
Akumulasi Amortisasi 501.186.626 417.879.050 Accumulated Amortization
Sub Jumlah 1.145.264.415.046 1.145.181.107.470 Sub-Total
Jumlah 5.263.570.948.867 5.258.306.040.601 Total
Biaya Emisi Obligasi 29.025.399.977 29.025.399.977 Bonds Issuance Cost
Dikurangi: Akumulasi Amortisasi (10.690.848.995) (9.964.679.096) Less: Accumulated Amortization
Biaya Emisi Obligasi Belum Diamortisasi 18.334.550.982 19.060.720.881 Unamortized Bond Issuance Costs
Obligasi dan Sukuk yang diterbitkan Perusahaan: Bonds and Sukuk issued by the Company:
a. Berdasarkan Akta Perubahan IV (Keempat) a. Based on the Deed of Amendment IV (Fourth)
Perjanjian Perwaliamanatan Obligasi IV Waskita Trusteeship Agreement Deed Shelf Registration
Karya Tahun 2022 No. 47 pada tanggal 22 April Bond IV Waskita Karya 2022 No. 47 dated April
2022 yang dibuat di hadapan Notaris Ashoya 22, 2022 from Notary Ashoya Ratam, S.H.,
Ratam, S.H., M.Kn., Perusahaan telah M.Kn., the Company issued Shelf Registration
menerbitkan Obligasi IV Waskita Karya Tahun Bond IV Waskita Karya Year 2022 amounting to
2022 dengan jumlah pokok obligasi sebesar Rp2,127,300,000,000 which consists of two
Rp2.127.300.000.000 yang dibagi dalam dua tranches:
seri:
- 124 -
Page 122
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
• Seri A dengan tingkat bunga tetap 6,65% per • Tranche A with fixed interest rate of 6.65%
tahun dengan nilai Rp658.000.000.000. p.a. with face value of Rp658,000,000,000.
• Seri B dengan tingkat bunga tetap 7,55% per • Tranche B with fixed interest rate of 7.55%
tahun dengan nilai Rp1.469.300.000.000. p.a with face value of Rp1,469,300,000,000.
Utang obligasi ini mensyaratkan Perusahaan The Bonds payable require the Company to
untuk mempertahankan rasio keuangan sebagai maintain financial ratios as follows:
berikut:
• Current ratio tidak kurang dari 0,5 : 1 (nol • Current ratio is not less than 0.5 : 1 (zero
koma lima berbanding satu); point five is to one);
• Debt to Equity a.d interest bearing debt tidak • Debt to Equity a.d interest bearing debt is no
lebih dari 5 : 1 (lima berbanding satu); more than 5 : 1 (five is to one); and
• Earning Before Interest, Tax, Depreciation • Earnings Before Interest, Tax, Depreciation
and Amortization (EBITDA) dengan Beban and Amortization (EBITDA) to Interest
Bunga Pinjaman tidak kurang dari 0,8 : 1 (nol Expense is not less than 0.8 : 1 (zero point
koma delapan berbanding satu). eight is to one).
Obligasi ini dijamin dengan Penjaminan These bonds are guaranteed by Govermnent
Pemerintah berdasarkan Peraturan Menteri Guarantee based on Regulation of The Minister
Keuangan Republik Indonesia Nomor of Finance of Republic Indonesia Number
211/PMK.08/2020 tanggal 22 Desember 2020 211/PMK.08/2020 dated December 22, 2020 and
dan Surat Persetujuan Prinsip Penjaminan Letter of Approval for Government Guarantee
Pemerintah dari Kementerian Keuangan Principles from The Ministry of Finance of
Republik Indonesia Nomor S-159/PR/2022 Republic Indonesia Number
tanggal 8 April 2022. S-159/PR/2022 dated April 8, 2022.
Pada tanggal 28 April 2022 Perusahaan On April 28, 2022, the Company obtained an
memperoleh pernyataan efektif dari OJK atas effective statement from the OJK on
Atas Pernyataan Pendaftaran Dalam Rangka the Registration Statement for the Public Offering
Penawaran Umum Obligasi IV PT Waskita Karya of PT Waskita Karya Bonds IV Year 2022 and the
Tahun 2022 Dan Penawaran Umum Sukuk Public Offering of Sukuk Mudharabah I based on
Mudharabah I berdasarkan Surat Keputusan No. Decree No. S-75/D.04/2022.
S-75/D.04/2022.
b. Berdasarkan Akta Perubahan IV (Keempat) b. Based on the Deed of Amendment IV (Fourth)
Perjanjian Perwaliamanatan Sukuk Mudharabah Trusteeship Agreement Deed Shelf Registration
I Waskita Karya Tahun 2022 No. 50 pada tanggal Sukuk Mudharabah I Waskita Karya 2022 No. 50
22 April 2022 yang dibuat di hadapan Notaris dated April 22, 2022 from Notary Ashoya Ratam,
Ashoya Ratam, S.H., M.Kn., Perusahaan telah S.H., M.Kn., the Company issued Shelf
menerbitkan Sukuk Mudharabah Waskita Karya Registration Sukuk Mudharabah I Waskita Karya
Tahun 2022 dengan jumlah pokok sebesar Year 2022 amounting to Rp1,148,100,000,000
Rp1.148.100.000.000 yang dibagi dalam dua which consists of two tranches:
seri:
• Seri A dengan tingkat bagi hasil tetap 6,65% • Tranche A with profit sharing rate of 6.65%
per tahun dengan nilai Rp383.000.000.000. p.a. with face value of Rp383,000,000,000.
• Seri B dengan tingkat bagi hasil tetap 7,55% • Tranche B with profit sharing rate of 7.55%
per tahun dengan nilai Rp765.100.000.000. p.a with face value of Rp765,100,000,000.
Utang sukuk ini mensyaratkan Perusahaan untuk Sukuk payables require the Company to
mempertahankan rasio keuangan sebagai maintain financial ratios as follows:
berikut:
• Current ratio tidak kurang dari 0,5 : 1 • Current ratio is not less than 0.5 : 1
(nol koma lima berbanding satu); (zero point five is to one);
• Debt to Equity a.d interest bearing debt tidak • Debt to Equity a.d interest bearing debt is no
lebih dari 5 : 1 (lima berbanding satu); more than 5 : 1 (five is to one); and
• Earning Before Interest, Tax, Depreciation • Earnings Before Interest, Tax, Depreciation
and Amortization (EBITDA) dengan Beban and Amortization (EBITDA) to Interest
Bunga Pinjaman tidak kurang dari 0,8 : 1 (nol Expense is not less than 0.8 : 1 (zero point
koma delapan berbanding satu). eight is to one).
- 125 -
Page 123
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Sukuk ini dijamin dengan Penjaminan These sukuk are guaranteed by Govermnent
Pemerintah berdasarkan Peraturan Menteri Guarantee based on Regulation of The Minister
Keuangan Republik Indonesia Nomor of Finance of Republic Indonesia Number
211/PMK.08/2020 tanggal 22 Desember 2020 211/PMK.08/2020 dated December 22, 2020 and
dan Surat Persetujuan Prinsip Penjaminan Letter of Approval for Government Guarantee
Pemerintah dari Kementerian Keuangan Principles from the Ministry of Finance of
Republik Indonesia Nomor S-159/PR/2022 Republic Indonesia Number S-159/PR/2022
tanggal 8 April 2022. Pada tanggal 28 April 2022 dated April 8, 2022. On April 28, 2022, the
Perusahaan memperoleh pernyataan efektif dari Company obtained an effective statement from
OJK atas Atas Pernyataan Pendaftaran Dalam the OJK on the Registration Statement for the
Rangka Penawaran Umum Obligasi IV PT Public Offering of PT Waskita Karya Bonds IV
Waskita Karya Tahun 2022 dan Penawaran Year 2022 and the Public Offering of Sukuk
Umum Sukuk Mudharabah I berdasarkan Surat Mudharabah I based on Decree No. S-
Keputusan No. S-75/D.04/2022. 75/D.04/2022.
c. Berdasarkan Akta Perubahan II (Kedua) c. Based on the Deed of Amendment II (Second)
Perjanjian Perwaliamanatan Obligasi III Waskita Trusteeship Agreement Deed Shelf Registration
Karya Tahun 2021 No. 36 pada tanggal 16 Bond III Waskita Karya 2021 No. 36 dated
September 2021 yang dibuat di hadapan Notaris September 16, 2021 from Notary Ashoya Ratam,
Ashoya Ratam, S.H., M.Kn., Perusahaan telah S.H., M.Kn., the Company issued Shelf
menerbitkan Obligasi III Waskita Karya Tahun Registration Bond III Waskita Karya Year 2021
2021 dengan jumlah pokok obligasi sebesar amounting to Rp1,773,000,000,000 which
Rp1.773.000.000.000 yang dibagi dalam dua seri: consists of two tranches:
• Seri A dengan tingkat bunga tetap 6,10% per • Tranche A with fixed interest rate of 6.10%
tahun dengan nilai Rp722.000.000.000. p.a. with face value of Rp722,000,000,000
• Seri B dengan tingkat bunga tetap 6,80% per • Tranche B with fixed interest rate of 6.80%
tahun dengan nilai Rp1.051.000.000.000. p.a with face value of Rp1,051,000,000,000.
Utang obligasi ini mensyaratkan Perusahaan Bonds payable require the Company to maintain
untuk mempertahankan rasio keuangan sebagai financial ratios as follows:
berikut:
• Current ratio tidak kurang dari 0,5 : 1 (nol • Current ratio is not less than 0.5 : 1 (zero
koma lima berbanding satu); point five is to one);
• Debt to Equity a.d interest bearing debt tidak • Debt to Equity a.d interest bearing debt is no
lebih dari 5 : 1 (lima berbanding satu); dan more than 5 : 1 (five is to one); and
• Earning Before Interest, Tax, Depreciation • Earnings Before Interest, Tax, Depreciation
and Amortization (EBITDA) dengan Beban and Amortization (EBITDA) to Interest
Bunga Pinjaman tidak kurang dari 0,8 : 1 (nol Expense is not less than 0.8 : 1 (zero point
koma delapan berbanding satu). eight is to one).
Obligasi ini dijamin dengan Penjaminan These bonds are guaranteed by Govermnent
Pemerintah berdasarkan Peraturan Menteri Guarantee based on Regulation of The Minister
Keuangan Republik Indonesia Nomor of Finance of Republic Indonesia Number
211/PMK.08/2020 tanggal 22 Desember 2020 211/PMK.08/202 dated December 22, 2020 and
dan Surat Persetujuan Prinsip Penjaminan Letter of Approval for Government Guarantee
Pemerintah dari Kementerian Keuangan Principles from the Ministry of Finance of
Republik Indonesia Nomor S-261/PR/2021 Republic Indonesia Number S-261/PR/2021
tanggal 21 Juni 2021. dated June 21, 2021.
d. Berdasarkan Akta Perubahan VI (Keenam) d. Based on the Deed of Amendment VI (Sixth) to
Perjanjian Perwaliamanatan Obligasi the Waskita Karya IV Continuous Bond Trustee
Berkelanjutan IV Waskita Karya Tahap I tahun Agreement Phase I 2020 No. 31 on March 21
2020 No. 31 pada tanggal 21 Maret 2024 yang 2024 made before Notary Dewantari Handayani,
dibuat di hadapan Notaris Dewantari Handayani, SH, MPA, the Company has issued Sustainable
SH, MPA, Perusahaan telah menerbitkan Bonds IV Waskita Karya Phase I 2020 with a
Obligasi Berkelanjutan IV Waskita Karya Tahap I principal amount of Rp135,500,000,000 with a
Tahun 2020 dengan jumlah pokok obligasi maturity date of 31 December 2034 and an
sebesar Rp135.500.000.000 tanggal jatuh tempo interest rate fixed 5% per year.
pada 31 Desember 2034 dan tingkat bunga tetap
5% per tahun.
- 126 -
Page 124
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Utang obligasi ini mensyaratkan Perusahaan Bonds payable require the Company to maintain
untuk mempertahankan rasio keuangan sebagai financial ratios as follows:
berikut:
Interest Services Coverage Ratio (ISCR) tidak Current ratio is not less than 1 : 1 (one is to one);
kurang dari 1 : 1 (satu berbanding satu);
Yang dimaksud : What is meant is :
− Interest Services Coverage Ratio (ISCR) − Interest Services Coverage Ratio (ISCR) is
adalah EBITDA dibagi Bunga Tunai (Cash EBITDA divided by Cash Interest on an
Interest) secara tidak terkonsolidasi dari unconsolidated basis from the Issuer;
Emiten; − EBITDA is profit before tax expense plus
− EBITDA adalah laba sebelum beban pajak interest costs plus depreciation and
ditambah biaya bunga ditambah amortization on an unconsolidated basis
depresiasi dan Amortisasi secara tidak from the Issuer;
terkonsolidasi dari Emiten; − Cash Interest means cash interest stated
− Bunga Tunai (Cash Interest) berarti bunga in the audited unconsolidated financial
tunai yang dinyatakan di dalam laporan statements of the Issuer.
keuangan Emiten tidak terkonsolidasi yang
diaudit.
Berdasarkan hasil pelaksanaan Rapat Umum Based on the results of the General Meeting of
Pemegang Obligasi ("RUPO") atas Obligasi Bondholders ("RUPO") on Waskita Karya
Berkelanjutan IV Waskita Karya Tahap I Tahun Sustainable Bonds IV Phase I 2020 in
2020 sesuai Surat Keterangan Notaris Nomor: accordance with Notarial Statement Letter
26/NOT/SK/WK-RUPO/II/2024 tanggal 22 Number: 26/NOT/SK/WK-RUPO/II/2024 dated
Februari 2024 dari Dewantari Handayani, SH, February, 22 2024 from Dewantari Handayani,
MPA, Notaris di Jakarta, bahwa RUPO telah SH, MPA, Notary in Jakarta, that the RUPO has
mengambil keputusan dimana sebanyak 92,38% taken a decision where 92.38% of bondholders
pemegang obligasi menyetujui usulan dengan agreed to the proposal with the following main
poin-poin utama sebagai berikut: points:
1. Tanggal pelunasan pokok obligasi, 1. Bond principal repayment date, for
untuk obligasi seri B, jatuh tempo pada series B bonds, is due on December 31,
tanggal 31 Desember 2034; 2034;
2. Ketentuan tingkat bunga untuk obligasi 2. Interest rate provisions for series B
seri B, sejak tanggal berlakunya bonds, from the effective date of the
perubahan Perjanjian Perwaliamanatan amendment to the Trustee Agreement
sampai dengan 31 Desember 2034 until 31 December 2034 with a fixed
dengan tingkat bunga tetap sebesar 5% interest rate of 5% per year;
per tahun;
3. Ketentuan mengenai jadwal dan periode 3. Provisions regarding the schedule and
pembayaran bunga Obligasi, period for Bond interest payments,
pembayaran bunga sejak tanggal interest payments from the effective
berlakunya perubahan Perjanjian date of the amendment to the Trustee
Perwaliamanatan sampai dengan tahun Agreement until 2034, will be paid in
2034, akan dibayarkan secara tunai cash every quarter starting from June
setiap triwulan dimulai pada tanggal 23 23, 2024 to December 31, 2034.
Juni 2024 sampai dengan 31 Desember
2034.
e. Berdasarkan Akta Perjanjian Perwaliamanatan e. Based on the Trusteeship Agreement Deed Shelf
Obligasi Berkelanjutan III Waskita Karya Tahap IV Registration Bond III Waskita Karya Phase IV
tahun 2019 No. 53 pada tanggal 26 April 2019 2019 No. 53 dated April 26, 2019 from Notary
yang dibuat di hadapan Notaris Fathiah Helmi, Fathiah Helmi, S.H., the Company issued Shelf
S.H., Perusahaan telah menerbitkan Obligasi Registration Bond III Waskita Karya Phase IV
Berkelanjutan III Waskita Karya Tahap IV Tahun Year 2019 amounting to Rp1,845,750,000,000
2019 dengan jumlah pokok obligasi sebesar which consists of two tranches:
Rp1.845.750.000.000 yang dibagi dalam dua seri:
• Seri A dengan dengan tingkat bunga tetap • Tranche A with fixed interest rate of 9.00%
9,00% per tahun dengan nilai p.a. with face value of Rp484,000,000,000
Rp484.000.000.000 dan sudah dibayar and have been paid in full on May 16, 2022.
lunas pada 12 Mei 2022.
- 127 -
Page 125
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
• Seri B dengan dengan tingkat bunga tetap • Tranche B with fixed interest rate of 9.75%
9,75% per tahun dengan nilai p.a. with face value of Rp1,361,750,000,000.
Rp1.361.750.000.000.
f. Berdasarkan Akta Perubahan IV Perjanjian f. Based on Deed of Amendment IV to Trusteeship
Perwaliamanatan No. 29 pada tanggal 21 Maret Agreement No. 29 on March 21, 2024 made
2024 yang dibuat di hadapan Notaris Dewantari before Notary Dewantari Handayani, SH, MPA,,
Handayani, SH, MPA,, Perusahaan telah the Company has issued Waskita Karya Phase
menerbitkan Obligasi Berkelanjutan III Waskita III Continuous Bonds III Year 2018 with a
Karya Tahap III Tahun 2018 dengan jumlah principal amount of Rp1,702,750,000,000
pokok obligasi sebesar Rp1.702.750.000.000 divided into two series:
yang dibagi dalam dua seri:
• Seri A dengan tingkat bunga tetap 9,00% per • Tranche A with a fixed interest rate of 9.00%
tahun dengan nilai Rp761.000.000.000 dan per annum with a face value of
telah dibayar lunas pada tanggal Rp761,000,000,000 and has been paid in full
27 September 2021. on September 27, 2021.
• Seri B dengan tingkat bunga tetap 5% per • Series B with a fixed interest rate of 5% per
tahun dengan nilai Rp941.750.000.000 year with a value of Rp941,750,000,000 with
dengan tanggal jatuh tempo pada 31 a maturity date of 31 December 2034 and a
Desember 2034 dan tingkat bunga tetap 5% fixed interest rate of 5% per year.
per tahun.
Utang obligasi ini mensyaratkan Perusahaan Bonds payable require the Company to maintain
untuk mempertahankan rasio keuangan sebagai financial ratios as follows:
berikut:
Interest Services Coverage Ratio (ISCR) tidak Current ratio is not less than 1 : 1 (one is to one);
kurang dari 1 : 1 (satu berbanding satu);
Yang dimaksud : What is meant is :
− Interest Services Coverage Ratio (ISCR) − Interest Services Coverage Ratio (ISCR) is
adalah EBITDA dibagi Bunga Tunai (Cash EBITDA divided by Cash Interest on an
Interest) secara tidak terkonsolidasi dari unconsolidated basis from the Issuer;
Emiten; − EBITDA is profit before tax expense plus
− EBITDA adalah laba sebelum beban pajak interest costs plus depreciation and
ditambah biaya bunga ditambah amortization on an unconsolidated basis
depresiasi dan Amortisasi secara tidak from the Issuer;
terkonsolidasi dari Emiten; − Cash Interest means cash interest stated
− Bunga Tunai (Cash Interest) berarti bunga in the audited unconsolidated financial
tunai yang dinyatakan di dalam laporan statements of the Issuer.
keuangan Emiten tidak terkonsolidasi yang
diaudit.
Berdasarkan hasil pelaksanaan Rapat Umum Based on the results of the General Meeting of
Pemegang Obligasi ("RUPO") atas Obligasi Bondholders ("RUPO") on Waskita Karya
Berkelanjutan III Waskita Karya Tahap III seri B Sustainable Bonds III Phase III Series B 2018 in
Tahun 2018 sesuai Surat Keterangan Notaris accordance with Notarial Statement Letter
Nomor: 24/NOT/SK/WK-RUPO/II/2024 tanggal Number: 24/NOT/SK/WK-RUPO/II/2024 dated
21 Februari 2024 dari Dewantari Handayani, SH, February, 21 2024 from Dewantari Handayani,
MPA, Notaris di Jakarta, bahwa RUPO telah SH, MPA, Notary in Jakarta, that the RUPO has
mengambil keputusan dimana sebanyak 77,91% taken a decision where 77.91% of bondholders
pemegang obligasi menyetujui usulan dengan agreed to the proposal with the following main
poin-poin utama sebagai berikut: points:
1. Tanggal pelunasan pokok obligasi, 1. Bond principal repayment date, for
untuk obligasi seri B, jatuh tempo pada series B bonds, is due on December 31,
tanggal 31 Desember 2034; 2034;
2. Ketentuan tingkat bunga untuk obligasi 2. Interest rate provisions for series B
seri B, sejak tanggal berlakunya bonds, from the effective date of the
perubahan Perjanjian Perwaliamanatan amendment to the Trustee Agreement
sampai dengan 31 Desember 2034 until 31 December 2034 with a fixed
dengan tingkat bunga tetap sebesar 5% interest rate of 5% per year;
per tahun;
- 128 -
Page 126
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
3. Ketentuan mengenai jadwal dan periode 3. Provisions regarding the schedule and
pembayaran bunga Obligasi, period for Bond interest payments,
pembayaran bunga sejak tanggal interest payments from the effective
berlakunya perubahan Perjanjian date of
Perwaliamanatan sampai dengan tahun the amendment to the Trustee
2034, akan dibayarkan secara tunai Agreement until 2034, will be paid in
setiap triwulan dimulai pada tanggal 23 cash every quarter starting from June
Juni 2024 sampai dengan 31 Desember 23, 2024 to December 31, 2034.
2034.
g. Berdasarkan Akta Perubahan II Perjanjian g. Based on Deed of Amendment II to Trusteeship
Perwaliamanatan No. 34 pada tanggal 21 Maret Agreement No. 34 on March 21 2024 which was
2024 yang dibuat di hadapan Notaris Dewantari made before Notary Dewantari Handayani, SH,
Handayani, SH, MPA,, Notaris di Jakarta. MPA,, Notary in Jakarta. The company issued
Perusahaan menerbitkan Obligasi Berkelanjutan Sustainable Bonds III Waskita Karya Phase II
III Waskita Karya Tahap II Tahun 2018 sebesar 2018 amounting to Rp3,451,500,000,000 which
Rp3.451.500.000.000 yang dibagi dalam dua were divided into two series:
seri:
• Seri A dengan tingkat bunga tetap 7,75% per • Tranche A with fixed interest rate of 7.75%
tahun dengan nilai Rp1.175.000.000.000. per annum with face value of
Obligasi ini sudah dibayar lunas pada Rp1,175,000,000,000. These bonds have
tanggal 22 Februari 2021. been paid in full on February 22, 2021.
• Seri B dengan tingkat bunga tetap 5% per • Series B with a fixed interest rate of 5% per
tahun dengan nilai Rp2.276.500.000.000 year with a value of Rp2,276,500,000,000
dengan tanggal jatuh tempo pada 31 with a maturity date of 31 December 2034
Desember 2034 dan tingkat bunga tetap 5% and a fixed interest rate of 5% per year.
per tahun.
Utang obligasi ini mensyaratkan Perusahaan Bonds payable require the Company to maintain
untuk mempertahankan rasio keuangan sebagai financial ratios as follows:
berikut:
Interest Services Coverage Ratio (ISCR) tidak Current ratio is not less than 1 : 1 (one is to one);
kurang dari 1 : 1 (satu berbanding satu);
Yang dimaksud : What is meant is :
− Interest Services Coverage Ratio (ISCR) − Interest Services Coverage Ratio (ISCR) is
adalah EBITDA dibagi Bunga Tunai (Cash EBITDA divided by Cash Interest on an
Interest) secara tidak terkonsolidasi dari unconsolidated basis from the Issuer;
Emiten; − EBITDA is profit before tax expense plus
− EBITDA adalah laba sebelum beban pajak interest costs plus depreciation and
ditambah biaya bunga ditambah amortization on an unconsolidated basis
depresiasi dan Amortisasi secara tidak from the Issuer;
terkonsolidasi dari Emiten; − Cash Interest means cash interest stated
− Bunga Tunai (Cash Interest) berarti bunga in the audited unconsolidated financial
tunai yang dinyatakan di dalam laporan statements of the Issuer.
keuangan Emiten tidak terkonsolidasi yang
diaudit.
Berdasarkan hasil pelaksanaan Rapat Umum Based on the results of the General Meeting of
Pemegang Obligasi ("RUPO") atas Obligasi Bondholders ("RUPO") on Waskita Karya
Berkelanjutan III Waskita Karya Tahap II seri B Sustainable Bonds III Phase II Series B 2018 in
Tahun 2018 sesuai Surat Keterangan Notaris accordance with Notarial Statement Letter
Nomor: 27/NOT/SK/WK-RUPO/II/2024 tanggal Number: 27/NOT/SK/WK-RUPO/II/2024 dated
22 Februari 2024 dari Dewantari Handayani, SH, February, 22 2024 from Dewantari Handayani ,
MPA, Notaris di Jakarta, bahwa RUPO telah SH, MPA, Notary in Jakarta, that the RUPO has
mengambil keputusan dimana sebanyak 79,19% taken a decision where 79.19% of bondholders
pemegang obligasi menyetujui usulan dengan agreed to the proposal with the following main
poin-poin utama sebagai berikut: points:
1. Tanggal pelunasan pokok obligasi, 1. Bond principal repayment date, for
untuk obligasi seri B, jatuh tempo pada series B bonds, is due on December 31,
tanggal 31 Desember 2034; 2034;
- 129 -
Page 127
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
2. Ketentuan tingkat bunga untuk obligasi 2. Interest rate provisions for series B
seri B, sejak tanggal berlakunya bonds, from the effective date of the
perubahan Perjanjian Perwaliamanatan amendment to the Trustee Agreement
sampai dengan 31 Desember 2034 until 31 December 2034 with a fixed
dengan tingkat bunga tetap sebesar 5% interest rate of 5% per year;
per tahun;
3. Ketentuan mengenai jadwal dan periode 3. Provisions regarding the schedule and
pembayaran bunga Obligasi, period for Bond interest payments,
pembayaran bunga sejak tanggal interest payments from the effective
berlakunya perubahan Perjanjian date of the amendment to the Trustee
Perwaliamanatan sampai dengan tahun Agreement until 2034, will be paid in
2034, akan dibayarkan secara tunai cash every quarter starting from June
setiap triwulan dimulai pada tanggal 23 23, 2024 to December 31, 2034.
Juni 2024 sampai dengan 31 Desember
2034.
Berdasarkan pemeringkatan yang diterbitkan Based on the rating published by
oleh PT Pemeringkat Efek Indonesia (Pefindo) PT Pemeringkat Efek Indonesia (Pefindo) on
tanggal 10 Oktober 2023, Peringkat Government 10 October 2023, the Government Guarantee
Guarantee untuk Obligasi III Seri A dan B Tahun Rating for Bonds III Series A dan B 2021 and
2021 dan Obligasi IV Seri A dan Tahun 2022 Bonds IV Series A dan B 2022 is idAAA(gg);
adalah idAAA(gg); Peringkat Government The Government Guarantee Rating for Sukuk
Guarantee untuk Sukuk untuk Mudharabah I Seri for Mudharabah I Series A dan B in 2022 is
A dan B Tahun 2022 adalah idAAA(sy)(gg); idAAA(sy)(gg); The rating for Sustainable Bonds
Peringkat Obligasi Berkelanjutan III Tahap IV III Phase IV Series B 2019 is idCCC; The rating
Seri B Tahun 2019 adalah idCCC; Peringkat for Continuous Bonds III Phase II Series B 2018,
Obligasi Berkelanjutan III Tahap II Seri B Tahun Continuous Bonds III Phase III Series B 2018
2018, Obligasi Berkelanjutan III Tahap III Seri B and Continuous Bonds IV Phase I 2020 is idD.
Tahun 2018 dan Obligasi Berkelanjutan IV Tahap
I Tahun 2020 adalah idD.
Utang obligasi ini mensyaratkan Perusahaan untuk Bonds payable require the Company to mantain
mempertahankan rasio keuangan sebagai berikut: financial ratios as follows:
• Current ratio tidak kurang dari 1 : 1 (satu • Current ratio is not less than 1 : 1 (one is to
berbanding satu); one);
• Debt to Equity a.d interest bearing debt tidak • Debt to Equity a.d interest bearing debt is no
lebih dari 3 : 1 (tiga berbanding satu); dan more than 3 : 1 (three is to one); and
• Earning Before Interest, Tax, Depreciation • Earnings Before Interest, Tax, Depreciation
and Amortization (EBITDA) dengan Beban and Amortization (EBITDA) to Interest
Bunga Pinjaman tidak kurang dari 1,5 : 1 Expense is not less than 1.5 : 1 (one point
(satu koma lima berbanding satu). five is to one).
Evaluasi pemenuhan atas persyaratan rasio dari The evaluation of the fulfillment of these requirements
penerbitan obligasi dilakukan pada setiap akhir is held on each year end. For Bonds Payable III in
tahun. Untuk utang Obligasi III Tahun 2021, Obligasi 2021, Bonds Payable IV in 2022 and Sukuk
IV Tahun 2022 dan Sukuk Mudharabah I Tahun 2022 Mudharabah I Tahun 2022, these are guaranteed by
dijamin oleh Pemerintah. government.
Obligasi yang diterbitkan entitas anak - WBP Bonds issued by subsidiary - WBP
Berdasarkan Akta Notaris No 37 tanggal 29 Based on Notarial Deed No. 37 dated November 29,
November 2023 dari Notaris Dewantari Handayani, 2023 from Notary Dewantari Handayani, SH, MPA,
SH, MPA, mengenai Perubahan II Perjanjian regarding Amendment II of the Trustee Agreement for
Perwaliamanatan Obligasi Wajib Konversi Waskita Compulsory Convertible Bonds of Waskita Beton
Beton Precast I Tahun 2023 dan Berdasarkan Akta Precast I Year 2023 and Based on Notarial Deed No.
Notaris No. 40 tanggal 29 November 2023 dari 40 dated November 29th, 2023 from Notary
Notaris Dewantari Handayani, S.H., MPA, mengenai Dewantari Handayani, S.H., MPA, regarding
Perubahan II Perjanjian Perwaliamanatan Obligasi Amendment II to the Waskita Beton Precast 2023
Wajib Konversi Waskita Beton Precast II Tahun 2023, Mandatory Convertible Bond Trustee Agreement II
obligasi WBP menjadi Obligasi Wajib Konversi. 2023, WBP bonds become Mandatory Convertible
(catatan 38) Bonds. (note 38)
- 130 -
Page 128
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
32. LIABILITAS JANGKA PENDEK LAINNYA 32. OTHER SHORT-TERM LIABILITIES
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Kementerian Pekerjaan Umum dan Perumahan Rakyat 32.556.096.062 1.293.547.819.357 The Ministry of Public Works and Housing
Insentif Kerja 4.248.372.658 4.248.372.658 Incentives
Utang Pesangon 29.557.790.313 163.521.092.503 Pension
Saverance
Fund Contribution
Payables
Jamsostek 15.184.311.675 12.429.289.164 Jamsostek
Lain-lain 1.822.417.566.149 1.793.877.866.849 Others
Dikurangi: Liabilitas Keuangan Less: Financial Liability
Saling Hapus (1.038.425.342.252) (1.038.425.342.252) Offset
Jumlah 865.538.794.605 2.229.199.098.279 Total
Liabilitas jangka pendek lainnya - lain-lain merupakan Other short-term liabilities - others represent accruals
beban akrual denda pajak dan beban pemeliharan for tax penalties and project maintenance expenses.
proyek.
Liabilitas jangka pendek lainnya kepada Kementerian Other short-term liabilities at the Ministry of Public
Pekerjaan Umum dan Perumahan Rakyat Works and Public Housing are:
merupakan:
TJT TJT
PT TJT telah menerima pinjaman dari Kementerian PT TJT has received borrowing from
Pekerjaan Umum dan Perumahan Rakyat Bidang the Ministry of Public Work and Housing, Financing
Pendanaan Kementerian Pekerjaan Umum. Section of the Ministry of Public Work. The borrowing
Pinjaman tersebut digunakan sebagai uang ganti is used as compensation of land acquisition for Ciawi
rugi pembelian tanah Jalan Tol Ciawi - Sukabumi. - Sukabumi Toll Road. The loan bears interest at LPS
Pinjaman ini dikenakan bunga LPS +1% per tahun +1% per annum and will due when the land
dan akan jatuh tempo pada kondisi yang lebih acquisition is completed or the toll road has been
dahulu dicapai yaitu pada saat lahan selesai atau operated, whichever is earlier.
jalan tol telah dioperasikan.
PBTR PBTR
Berdasarkan Akta Notaris No. 3 tanggal 8 Mei 2013 Based on Notarial Deed No. 3 dated May 8, 2013 by
oleh Trie Sulistiowarni, S.H., Notaris di Jakarta, PBTR Trie Sulistiowarni, S.H., Notary in Jakarta, PBTR
memperoleh fasilitas pinjaman dari Kementerian received loan facility from Ministry of Public Work and
Pekerjaan Umum dan Perumahan Rakyat yang Public Housing represented by Badan Layanan
diwakili oleh Badan Layanan Umum (BLU) Badan Umum (“BLU”) - Toll Road Regulatory Agency
Pengatur Jalan Tol Bidang Pendanaan Departemen Financing Section of Ministry of Public Work and
Pekerjaan Umum dan Perumahan Rakyat untuk Public Housing used as compensation of land
keperluan uang ganti rugi pembelian lahan Jalan Tol acquisition for Pemalang - Batang toll road with
Pemalang - Batang dengan nilai maksimum pinjaman maximum loan amounted to Rp180,168,000,000 and
sebesar Rp180.168.000.000 dan dikenakan suku beared interest of LPS + 1% and will be mature at
bunga sebesar LPS + 1% dan akan jatuh tempo pada the end of 2018. Up to the date of this audit report,
akhir tahun 2018. Sampai dengan tanggal laporan the Company still awaiting a letter from BLU
audit, Perusahaan masih menunggu surat dari BLU regarding the due date of repaymentprincipal which
terkait tanggal jatuh tempo pelunasan pokok is no later than six months sincethe PBTR received
pinjaman yaitu paling lambat enam bulan sejak surat the letter.
diterima PBTR.
33. UTANG BANK JANGKA PANJANG 33. LONG-TERM BANK LOANS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ The Company
Perjanjian Restrukturisasi Induk/ Master Restructuring Agreement
PT Bank Negara Indonesia (Persero) Tbk 7.528.214.789.490 7.517.725.933.299
PT Bank Mandiri (Persero) Tbk 4.552.387.330.532 4.539.578.255.481
PT Bank Rakyat Indonesia (Persero) Tbk 2.695.686.687.518 2.695.686.687.518
PT Bank Syariah Indonesia 2.000.530.926.151 2.045.177.012.979
- 131 -
Page 129
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Sindikasi Modal Kerja/ Working Capital Syndication
PT Bank Mandiri (Persero) Tbk 2.414.895.216.220 2.410.539.080.368
PT Bank Rakyat Indonesia (Persero) Tbk 1.798.687.779.996 1.798.687.779.996
PT Bank Negara Indonesia (Persero) Tbk 414.939.574.508 414.939.574.508
Entitas anak/ Subsidiaries
WTR Grup/Group
Non Sindikasi Modal Kerja/ Working Capital Non Syndication
PT Bank Rakyat Indonesia (Persero) Tbk
Kredit Investasi/Investment Credit -- 1.743.695.120.235
Kredit IDC/IDC Credit -- 113.323.922.643
Sindikasi Modal Kerja/ Working Capital Syndication
PT Bank Negara Indonesia (Persero) Tbk
Kredit Investasi/Investment Credit 1.603.713.686.645 1.572.447.081.648
Kredit IDC/IDC Credit 120.305.936.059 147.543.390.591
PT Bank Rakyat Indonesia (Persero) Tbk
Kredit Investasi/Investment Credit 187.890.772.297 159.131.671.543
Kredit IDC/IDC Credit 20.597.897.222 45.659.312.555
PT Bank Syariah Indonesia (d/h PT Bank BNI Syariah)
Kredit Investasi/Investment Credit 192.052.883.818 192.133.321.875
PT Bank Syariah Indonesia Tbk (d/h PT Bank Mandiri Syariah)
Kredit Investasi/Investment Credit 730.395.022.547 735.922.152.663
WKR
Modal Kerja/ Working Capital
PT Bank Tabungan Negara (Persero) Tbk 1.100.420.255.755 1.072.950.000.008
WBP
PT Bank Rakyat Indonesia (Persero) Tbk 861.798.917.980 863.227.418.096
PT Bank Syariah Indonesia (d/h PT Bank BRI Syariah) 697.299.507.085 698.440.760.706
PT Bank Negara Indonesia (Persero) Tbk 535.380.691.483 536.267.943.238
PT Bank Mandiri (Persero) Tbk 304.818.328.075 305.298.506.454
Diskonto belum diamortisasi/ Unamortized discount (1.594.954.450.413) (1.445.551.944.268)
Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/ Less: Current Maturities (549.767.841.636) (605.258.996.909)
Sub Jumlah/ Sub-Total 25.615.293.911.332 27.557.563.985.227
Pihak Ketiga/ Third Parties
Perusahaan/ The Company
Perjanjian Restrukturisasi Induk/ Master Restructuring Agreement
PT Bank BTPN Tbk 2.276.032.811.377 2.276.032.811.377
PT Bank Pan Indonesia Tbk 1.937.854.730.295 1.937.854.730.295
Bank of China Ltd 1.140.424.112.008 1.140.424.112.008
PT Bank Pembangunan Daerah
Jawa Barat dan Banten Tbk 998.222.785.772 998.222.785.772
PT Bank UOB Indonesia 251.102.529.990 251.102.529.990
PT Shinhan Bank Indonesia 238.064.217.020 238.064.217.020
PT Bank Maybank Indonesia Tbk 500.000.000.000 500.000.000.000
PT Bank Permata Tbk 699.599.183.062 699.599.183.062
Bank QNB Indonesia 417.796.279.058 417.796.279.058
PT Bank KEB Hana Indonesia 281.805.760.004 281.805.760.004
PT Bank OCBC NISP Tbk 281.805.760.004 281.805.760.004
PT Bank DKI 235.000.000.000 235.000.000.000
PT Bank China Construction Bank Indonesia Tbk 225.444.608.003 225.444.608.003
PT Bank CTBC Indonesia 169.083.456.002 169.083.456.002
PT Bank BNP Paribas Indonesia 154.781.999.763 154.781.999.763
PT Bank Resona Perdania Indonesia 167.137.162.274 167.137.162.274
PT Bank SBI Indonesia 84.541.728.001 84.541.728.001
Sindikasi Modal Kerja/ Working Capital Syndication
PT Bank Pembangunan Daerah
Jawa Barat dan Banten Tbk 326.986.119.184 326.986.119.184
PT Bank Pembangunan Daerah Sumatera Utara 326.986.119.198 326.986.119.198
Entitas anak/ Subsidiaries
WTR
Sindikasi Modal Kerja/ Working Capital Syndication
WTTR, PBTR, dan/and WBW
PT CIMB Niaga Tbk - Unit Usaha/ Business Unit Syariah
Kredit Investasi/Investment Credit 577.475.683.420 504.907.385.495
Kredit IDC/IDC Credit -- 59.016.579.719
- 132 -
Page 130
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
PT Bank Aceh Syariah
Kredit Investasi/Investment Credit 384.135.598.640 384.266.543.038
PT Bank Pembangunan Daerah Riau Kepri - Unit Usaha/
Business Unit Syariah
Kredit Investasi/Investment Credit 72.031.018.062 72.049.957.940
PT Bank Bank Pembangunan Daerah DIY - Unit Usaha/
Business Unit Syariah
Kredit Investasi/Investment Credit 48.013.220.377 48.033.330.077
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk
- Unit Usaha/ Business Unit Syariah
Kredit Investasi/Investment Credit 96.706.643.011 97.094.806.289
PT Bank Pembangunan Daerah Jawa Timur Tbk - Unit Usaha/
Business Unit Syariah
Kredit Investasi/Investment Credit 96.245.948.344 84.151.230.915
Kredit IDC/IDC Credit -- 9.836.097.725
PT Bank Pembangunan Daerah Kalimantan Barat
Kredit Investasi/Investment Credit 198.286.588.803 170.325.365.599
Kredit IDC/IDC Credit 24.602.647.445 48.589.070.884
PT Bank Kalimantan Selatan - Unit Usaha/ Business Unit Syariah
Kredit Investasi/Investment Credit 48.020.678.704 48.033.305.290
PT Bank Pembangunan Daerah Sumatera Utara
Kredit Investasi/Investment Credit 135.495.068.301 135.547.561.634
Kredit IDC/IDC Credit 11.595.188.699 11.595.188.699
PT Bank Pembangunan Daerah Jambi
Kredit Investasi/Investment Credit 135.495.068.301 135.547.561.634
Kredit IDC/IDC Credit 21.772.160.404 20.897.605.642
PT Bank Pembangunan Daerah Bengkulu
Kredit Investasi/Investment Credit 101.329.268.160 80.909.003.845
Kredit IDC/IDC Credit 10.326.877.943 28.886.740.768
PT Bank Pembangunan Daerah Lampung
Kredit Investasi/Investment Credit 135.554.261.175 81.950.321.874
Kredit IDC/IDC Credit 4.193.143.516 56.040.521.388
PT Bank Pembangunan Daerah DIY
Kredit Investasi/Investment Credit 45.165.022.767 45.182.520.545
Kredit IDC 7.257.386.807 6.965.868.552
PT Bank Pembangunan Daerah Bali
Kredit Investasi/Investment Credit 205.130.514.178 148.682.293.049
Kredit IDC 21.213.449.756 75.390.238.681
PT Bank Pembangunan Daerah Kalimantan Tengah
Kredit Investasi/Investment Credit 135.495.068.301 135.547.561.634
Kredit IDC/IDC Credit 21.772.160.404 20.897.605.642
PT Bank Pembangunan Daerah Kalimantan Selatan
Kredit Investasi/Investment Credit 229.931.476.000 216.456.565.479
Kredit IDC/IDC Credit 32.099.038.347 42.891.485.949
PT Bank Pembangunan Daerah Sulawesi Tengah
Kredit Investasi/Investment Credit 45.165.022.767 45.182.520.545
Kredit IDC/IDC Credit 7.257.386.807 6.965.868.552
PT Bank Pembangunan Daerah Sulawesi Selatan dan Sulawesi Barat
Kredit Investasi/Investment Credit 67.747.042.537 67.773.289.204
Kredit IDC/IDC Credit 10.886.571.813 10.449.294.432
PT Bank Pembangunan Daerah Sumatera Selatan dan Bangka Belitung
Kredit Investasi/Investment Credit 361.263.756.777 340.700.609.572
Kredit IDC/IDC Credit 39.177.012.075 55.831.340.485
PT Bank Pembangunan Daerah Riau dan Kepulauan Riau
Kredit Investasi/Investment Credit 348.071.098.847 331.064.627.037
Kredit IDC/IDC Credit 35.845.224.431 49.949.342.204
PT Bank Pembangunan Daerah Papua
Kredit Investasi/Investment Credit 503.216.875.572 491.803.888.476
Kredit IDC/IDC Credit 77.618.716.534 84.578.131.030
PT Bank Pembangunan Daerah Maluku dan Maluku Utara
Kredit Investasi/Investment Credit 118.339.843.242 100.538.090.765
Kredit IDC/IDC Credit 15.287.127.449 31.522.362.209
- 133 -
Page 131
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
PT Bank Pembangunan Daerah Nusa Tenggara Timur
Kredit Investasi/Investment Credit 191.471.212.164 167.550.315.347
Kredit IDC/IDC Credit 19.223.375.256 39.335.748.032
PT Bank Pembangunan Daerah Jawa Timur Tbk
Kredit Investasi/Investment Credit 782.938.436.929 719.716.519.296
Kredit IDC/IDC Credit 83.070.739.068 132.660.715.583
PT Bank Nagari
Kredit Investasi/Investment Credit 180.659.107.841 180.729.098.952
Kredit IDC/IDC Credit 15.461.234.826 15.461.234.826
PT Bank Pan Indonesia Tbk
Kredit Investasi/Investment Credit 1.010.178.524.792 955.201.946.088
Kredit IDC/IDC Credit 67.040.022.471 108.498.901.844
PT Bank ICBC Indonesia
Kredit Investasi/Investment Credit 201.170.686.921 181.486.954.332
Kredit IDC/IDC Credit 4.935.591.611 20.817.960.026
PT Bank Artha Graha International Tbk
Kredit Investasi/Investment Credit 135.495.068.301 135.547.561.634
Kredit IDC/IDC Credit 21.772.160.403 20.897.605.641
PT Bank Pembangunan Daerah Jawa Tengah
Kredit Investasi/Investment Credit 225.825.113.834 225.912.602.723
Kredit IDC/IDC Credit 19.325.314.499 19.325.314.499
PT Bank Mega Syariah
Kredit investasi 97.386.003.011 98.122.953.689
WKR
PT J Trust Bank 60.840.725.789 60.937.500.000
WKI
Kredit Investasi/Investment Credit
PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk 105.553.239.022 108.927.609.265
WBP
PT Bank Tabungan Pensiunan Nasional Tbk 613.182.849.796 614.149.511.847
PT Bank Permata Tbk 459.292.521.370 459.997.319.257
PT Bank CTBC Indonesia 325.150.690.598 325.656.250.000
PT Bank DKI 118.434.185.683 118.434.185.683
PT BCA Syariah 110.842.053.876 111.019.443.140
PT Bank ICBC Indonesia 81.143.514.438 81.273.937.783
Diskonto belum diamortisasi/ Unamortized discount (818.758.495.308) (1.044.647.354.547)
Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/ Less: Current Maturities (580.270.964.199) (469.962.021.053)
Sub Jumlah/ Sub Total 18.673.251.132.723 18.485.772.857.399
Jumlah 44.288.545.044.055 46.043.336.842.626
Suku bunga kontraktual per tahun sebagai berikut: Contractual interest rate per annum are as follow:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Perusahaan/ The Company
PT Bank Negara Indonesia (Persero) Tbk 5,50% 5,50%
PT Bank Rakyat Indonesia (Persero) Tbk 5,50% 5,50%
PT Bank Mandiri (Persero) Tbk 5,50% 5,50%
PT Bank Pan Indonesia Tbk 5,50% 5,50%
PT Bank BTPN Tbk 5,50% 5,50%
PT Bank UOB Indonesia 5,50% 5,50%
PT Bank DKI 5,50% 5,50%
PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank Syariah Mandiri,
PT Bank BNI Syariah, dan PT Bank BRIsyariah Tbk) 5,50% 5,50%
PT Bank BNP Paribas Indonesia 5,50% 5,50%
PT Bank Pembangunan Daerah
Jawa Barat dan Banten Tbk 5,50% 5,50%
PT Bank Maybank Indonesia Tbk 5,50% 5,50%
PT Bank BTPN Tbk,
Bank of China (Hong Kong) Limited Jakarta Branch, PT Bank KEB Hana Indonesia,
PT Bank Permata Tbk., PT Bank OCBC NISP Tbk., PT Bank China Construction Bank
Indonesia Tbk., PT Bank CTBC Indonesia, PT Bank Shinhan Indonesia, dan
PT Bank SBI Indonesia 5,50% 5,50%
Bank of China Ltd 5,50% 5,50%
- 134 -
Page 132
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
PT Bank BTPN Tbk,
PT Bank Permata Tbk., PT Bank Shinhan Indonesia, dan PT Bank Resona Perdania 5,50% 5,50%
PT Bank Mandiri (Persero) Tbk,
PT Bank Negara Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk, PT
Bank Pembangunan Daerah Jawa Barat dan Banten Tbk dan PT Bank Pembangunan 8,55% 8,34%
Daerah Sumatera Utara
Entitas anak/ Subsidiary Entity - WBP
PT Bank Permata Tbk 2,00% 2,00%
PT Bank Mandiri (Persero) Tbk 2,00% 2,00%
PT Bank ICBC Indonesia 2,00% 2,00%
PT Bank CTBC Indonesia 2,00% 2,00%
PT Bank Negara Indonesia (Persero) Tbk 2,00% 2,00%
PT Bank BCA Syariah 2,00% 2,00%
PT Bank Rakyat Indonesia (Persero) Tbk 2,00% 2,00%
PT Bank Syariah Indonesia
(d/h/ formerly PT Bank BRI Syariah dan PT Bank BNI Syariah) 2,00% 2,00%
PT Bank BTPN Tbk 2,00% 2,00%
Perjanjian Restrukturisasi Restructuring Agreement
Perusahaan The Company
Pihak Berelasi Related Parties
1. Perjanjian Restrukturisasi Induk 1. Master Restructuring Agreement
Berdasarkan Akta Notaris Ashoya Ratam S.H., Based on the Notary Deed of Ashoya Ratam
M.Kn, No. 40 tanggal 25 Agustus 2021, S.H., M.Kn, No. 40 dated August 25, 2021,
Perusahaan menandatangani perjanjian dengan the Company signed agreements with PT Bank
PT Bank Mandiri (Persero) Tbk, Mandiri (Persero) Tbk, PT Bank Rakyat
PT Bank Rakyat Indonesia (Persero) Tbk, Indonesia (Persero) Tbk, PT Bank Negara
PT Bank Negara Indonesia (Persero) Tbk, Indonesia (Persero) Tbk, PT Bank DKI,
PT Bank DKI, PT Bank Pembangunan Daerah PT Bank Pembangunan Daerah Jawa Barat and
Jawa Barat dan Banten Tbk, PT Bank Syariah Banten Tbk, PT Bank Syariah Indonesia Tbk and
Indonesia Tbk dan PT Bank BTPN Tbk untuk PT Bank BTPN Tbk to restructure
merestrukturisasi kewajiban Perusahaan. the Company's obligations. The Bank's parties
Pihak-pihak Bank setuju melakukan agreed to restructure the Company's payment
restrukturisasi atas kewajiban-kewajiban liabilities in relation to the financing facilities
pembayaran Perusahaan sehubungan dengan provided by the banks with total amount of
fasilitas-fasilitas pembiayaan yang diberikan oleh Rp29,252,309,664,899. The restructuring of
pihak-pihak bank dengan jumlah keseluruhan the Company's liabilities was divided into 2
sebesar Rp29.252.309.664.899. Restrukturisasi (two) Tranches, namely:
kewajiban Perusahaan tersebut dibagi
menjadi 2 (dua) Tranches, yaitu:
a. Fasilitas Kredit a. Credit Facility
- Fasilitas Kredit Tranche A - Tranche A credit facility amounting to
sebesar Rp13.422.237.848.046, Rp13,422,237,848,046, with a fixed rate
dengan sebesar 5,5% dan fixed rate 8% of 5.5% and a fixed rate of 8% for the
untuk fasilitas Tranche Revolving A; Tranche Revolving A facility;
- Fasilitas Kredit Tranche B - Tranche B credit facility amounting to
sebesar Rp13.616.139.687.859, Rp13,616,139,687,859, with a fixed rate
dengan fixed rate sebesar 5,5%. of 5.5%.
b. Fasilitas Pembiayaan Syariah b. Sharia Financing Facilities
- Fasilitas Pembiayaan Syariah Tranche - Tranche A Sharia Financing Facility
A sebesar Rp307.100.787.816; amounting to Rp307,100,787,816;
- Fasilitas Pembiayaan Syariah Tranche - Tranche B Sharia Financing Facility
B sebesar Rp1.906.831.341.177. amounting to Rp1,906,831,341,177.
Jatuh tempo pembayaran pinjaman pada tanggal The maturity date of the loan payment is on
31 Desember 2026. Terdapat opsi perpanjangan December 31, 2026. There is an option to extend
waktu pada fasilitas kredit Tranche B2 paling the term of the Tranche B2 credit facility up to
lama sampai tanggal 31 Desember 2031. December 31, 2031. The collateral for each of
- 135 -
Page 133
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Jaminan atas masing-masing fasilitas kredit ini these credit facilities is still subject to
tetap tunduk pada dokumen-dokumen jaminan the collateral documents that have been made
yang telah dibuat dan ditandatangani atau yang and signed or to be made and signed by
akan dibuat dan ditandatangi para Pihak. the Parties.
Perusahaan diwajibkan mempertahankan rasio Companies are required to maintain financial
keuangan sebagai berikut: Current ratio minimal ratios as follows: Current ratio of at least 1 (one)
1 (satu) kali, Interest Service Coverage Ratio time, interest service coverage ratio of at least
(ISCR) minimal 1,0 kali yang berlaku per laporan 1.0 time applicable per financial report December
keungan 31 Desember 2023, Interest Service 31, 2023, Interest Service Coverage Ratio
Coverage Ratio minimal 1,1 (satu koma satu) kali (ISCR) at least 1.1 (one point one) time
yang berlaku per laporan keuangan 31 Maret applicable per financial statement March 31,
2024, dan Ekuitas minimal 2024, and a minimum Equity of
Rp3.000.000.000.000. Rp3,000,000,000,000.
Pada tahun 2023, Grup melakukan perhitungan In 2023, the Group carried out master
restrukturisasi induk sesuai akta perjanjian restructuring calculations in accordance with
Master Restructuring Agreement (MRA) induk the Master Restructuring Agreement (MRA) deed
No. 40 tanggal 25 Agustus 2021 dan akta no. 40 dated 25 August 2021 and deed of MRA
perjanjian MRA pada entitas anak, berdasarkan agreement on subsidiary, based on the results of
hasil perhitungan independen Kantor Akuntan independent calculations by the Heliantono and
Publik Heliantono dan Rekan yang tersaji Partners Public Accounting Firm which are
didalam penyajian catatan utang bank jangka presented in the presentation of long-term bank
panjang. loan disclosure.
Perjanjian kredit ini dijamin dan diikat dengan The credit agreement is secured and bounded
piutang usaha Perusahaan. Selain itu, perjanjian with the Company’s account receivables. In
kredit ini juga dijamin dan diikat dengan aset addition, this credit agreement is also guaranteed
tetap Perusahaan, dengan rincian sebagai and bound by The Company’s fixed assets, with
berikut: detalis as follows:
• PT Bank Mandiri (Persero) Tbk, jaminan • PT Bank Mandiri (Persero) Tbk, collateral in
berupa 3 (tiga) bidang tanah berikut the form of 3 (three) plots of land and
bangunan kantor cabang Pekanbaru, 1 buildings at Pekanbaru Branch office, 1
(satu) bidang tanah yang berlokasi di (one) plot of land at Karawang, 13 (thirteen)
Karawang, 13 (tiga belas) bidang tanah yang plots of land at Cileungsi, 2 (two) plots of land
berlokasi di Cileungsi, 2 (dua) bidang tanah at Makasar, and 2 (two) plots of land at Bali
yang berlokasi di Makassar, dan 2 (dua) which have been submitted and tied with
bidang tanah yang berlokasi di Bali yang guarantee rights amounting to Rp
telah diserahkan dan telah diikat hak Rp143,700,000,000.
tanggungan (HT) dengan nilai
Rp143.700.000.000.
a. Investasi jangka pendek - deposito a. Short term investment - deposit
sebesar Rp8.448.200.000. amounting to Rp8,448,200,000).
b. 3 (tiga) bidang tanah berikut bangunan b. 3 (three) plots of land and buildings at
kantor cabang Pekanbaru, 1 (satu) Pekanbaru Branch office, 1 (one) plot of
bidang tanah yang berlokasi di land at Karawang, 13 (thirteen) plots of
Karawang, 13 (tiga belas) bidang tanah land at Cileungsi, 2 (two) plots of land at
yang berlokasi di Cileungsi, 2 (dua) Makasar, and 2 (two) plots of land at Bali
bidang tanah yang beralokasi di which have been submitted and tied with
Makassar, dan 2 (dua) bidang tanah guarantee rights amounting to
yang berlokasi di Bali yang telah Rp143,700,000,000.
diserahkan dan telah diikat hak
tanggungan (HT) dengan nilai
Rp143.700.000.000.
• PT Bank Negara Indonesia (Persero) Tbk, • PT Bank Negara Indonesia (Persero) Tbk,
jaminan berupa: jaminan berupa:
a. Persediaan yang telah diikat akta fidusia a. Inventory which has been tied by
No. 5 tanggal 13 Agustus 1998 dan telah fiduciary deed No. 5 dated August 13,
didaftarkan di Kantor Pendaftaran 1998 and was registered at
Fidusia; Sertifikat Jaminan Fidusia No. the Fiduciary Registration Office;
C2-4831HT.04.06.TH. 2001/NTSD the Fiduciary Certificate No. C2-
- 136 -
Page 134
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
tanggal 26 Januari 2001 senilai 4831HT. 04.06.TH.2001/NTSD dated
Rp8.268.049.363. January 26, 2001 amounting to
Rp8,268,049,363.
b. Satu bidang tanah SHGB No. 724 b. A plot of land SHGB No. 724 dated
tanggal 29 Maret 1988 sampai dengan 1 March 29, 1988 until December 1, 2027,
Desember 2027 seluas 2.098 m2 an area of 2,098 sqm located in
terletak di Kelurahan Cipinang Kelurahan Cipinang Cempedak,
Cempedak, Kecamatan Jatinegara, Kecamatan Jatinegara, East Jakarta on
Jakarta Timur, atas nama Perusahaan behalf of the Company amounting to
senilai Rp1.500.000.000 sesuai Rp1,500,000,000 according to SHT
dengan SHT No. 397/T/1988, senilai No. 397/T/1988, amounting to
Rp31.000.000.000 sesuai dengan Rp31,000,000,000 according to SHT.II
SHT.II No. 408/2004, senilai No. 408/2004, amounting to
Rp48.320.400.000 sesuai dengan SHT Rp48,320,400,000 according to SHT III
III No. 06386/2014 dan senilai No. 06386/2014, amounting to
Rp11.120.940.000 sesuai dengan Rp11,120,940,000 according to SHT IV
SHT IV No. 01623/2015 dan senilai No. 01623/2015 and amounting to
Rp250.208.660.000 sesuai dengan SHT Rp250,208,660,000 according to SHT V
V No. 03630/2021. No. 03630/2021.
c. Satu bidang tanah SHGB No. 38, c. A plot of land with SHGB No. 38, April
tanggal 21 April 2003 sampai dengan 06 21, 2003 until August 06, 2040, an area
Agustus 2040, seluas 1.332 m2 terletak of 1,332 sqm, located at Jl. Langko
di Jl. Langko Kelurahan Ampenan Kelurahan Ampenan Selatan,
Selatan, Kecamatan Ampenan, Kecamatan Ampenan, Mataram, West
Mataram, Nusa Tenggara Barat, atas Nusa Tenggara, on behalf of the
nama Perusahaan Cabang NTB senilai Company NTB Branch amounting to
Rp1.332.000.000 sesuai dengan SHT.I Rp 1,332,000,000 according to SHT.I
No. 687/2007, senilai Rp1.860.010.000 No. 687/2007, amounting
sesuai dengan SHT II No. 30/2016 Rp1,860,010,000 according to SHT II
dan senilai Rp31.509.990.000 sesuai No. 30/2016 and amounting to
dengan SHT III No. 01882/2021. Rp31,509,990,000 according to SHT III
No. 01882/2021.
d. Satu bidang tanah SHGB No. 2001 d. A plot of land with SHGB No. 2001 dated
tanggal 1 Juni 2006 sampai dengan June 1, 2006 until on January 1, 2026,
tanggal 1 Januari 2026, seluas 5.798 an area of 5,798 sqm, located in
m2, terletak di Kelurahan Kuta Alam, Kelurahan Kuta Alam, Banda Aceh,
Banda Aceh, Aceh, atas nama Aceh, on behalf of the Company
Perusahaan senilai Rp5.191.600.000 amounting to Rp5,191,600,000
sesuai dengan SHT I No. 323, senilai Rp according to SHT I No. 323, amounting
9.779.660.000 sesuai SHT II Rp9,779,660,000 according to SHT II
No. 1375/2015 dan senilai No. 1375/2015 and amounting to
Rp11.398.740.000 sesuai dengan SHT Rp11,398,740,000 according to SHT III
III No. 00884/2021. No. 00884/2021.
e. Satu bidang tanah SHGB No. e. A plot of land with SHGB No. 4 dated
4 tanggal 10 November 1998 sampai November 10, 1998 until December 15,
dengan 15 Desember 2036 seluas 2036 an area of 2,511 sqm,
2.511 m2, terletak di Desa/Kelurahan located in Desa/Kelurahan Batung Taba
Batung Taba Nan XX, Kecamatan Nan XX, Kecamatan Lubuk-Begalung,
Lubuk-Begalung, Padang, Sumatera Padang, West Sumatera, on behalf of
Barat, atas nama Perusahaan senilai the Company amounting to
Rp651.430.000, senilai Rp651,430,000, amounting
Rp6.321.020.000 sesuai SHT II No. Rp6,321,020,000 according to SHT II
169/2016 dan senilai Rp2.012.550.000 No. 169/2016 and amounting to
sesuai dengan SHT III No. 01795/2021. Rp2,012,550,000 according to SHT III
No. 01795/2021.
f. Satu bidang tanah SHGB No. 7 f. A plot of land with SHGB No. 7 dated
tanggal 10 Februari 1993 sampai February 10, 1993 until February 8,
dengan 08 Februari 2033 seluas 806 2033, an area of 806 sqm, located in
m2, terletak di Kelurahan Kp. Jao, Kelurahan Kp. Jao, Kecamatan Padang
Kecamatan Padang Barat, Padang, Barat, Padang, West Sumatera, on
Sumatera Barat, atas nama Perusahaan behalf of the Company amounting to
senilai Rp1.270.880.000 sesuai Rp1,270,880,000 according to SHT I
- 137 -
Page 135
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dengan SHT I No. 3129/2001, senilai No.129/2001, amounting to
Rp 460.020.000 sesuai dengan SHT II Rp460,020,000 according to SHT II No.
No. 1151/2007. SHGB tersebut telah 1151/2007. The land right (SHGB) has
diperpanjang sampai dengan 7 Februari been extended until February 7, 2033,
2033, senilai Rp 3.474.910.000 sesuai amounting to Rp3,474,910,000
SHT III No. 1846/2016 dan senilai according to SHT III No. 1846/2016 and
Rp2.489.190.000 sesuai dengan SHT IV amounting to Rp2,489,190,000
No. 01734/2021. according to SHT IV No. 01734/2021.
g. Satu bidang tanah SHGB No. 436 g. A plot of land with SHGB No. 436 dated
tanggal 10 Maret 1998 sampai dengan March 10, 1998 until June 19, 2032, an
19 Juni 2032, seluas 1.004 m2, terletak area of 1,004 sqm, located in Desa
di Desa Sungai Raya, Pontianak, Sungai Raya, Pontianak, West
Kalimantan Barat, atas nama Kalimantan, on behalf of the
Perusahaan senilai Rp464.850.000 Company amounting to Rp
sesuai dengan SHT I No. 464,850,000 according to SHT I
356/2001, senilai Rp747.850.000 No. 356/2001, amounting to
sesuai dengan SHT II No. 169/2007 Rp747,850,000 according to SHT II
dan senilai Rp3.595.940.000 sesuai No. 169/2007, and amounting to
dengan SHT III No. 36/2016. Rp3,595,940,000 according to SHT III
No. 36/2016.
h. Satu bidang tanah SHGB No. 1085 h. A plot of land with SHGB No. 1085 dated
tanggal 18 Desember 2006 December 18, 2006 until November 23,
sampai dengan 23 November 2026, 2026, an area of 1,404 sqm, located in
seluas 1.404 m2, terletak di Kelurahan Kelurahan Jemur Wonosari, Kecamatan
Jemur Wonosari, Kecamatan Wonocolo, Wonocolo, Surabaya, East Java, on
Surabaya, Jawa Timur, atas nama behalf of the Company amounting
Perusahaan senilai Rp2.665.700.000 to Rp2,665,700,000 according to
sesuai dengan SHT I No. SHT I No. 2952/2007, amounting
2952/2007, senilai Rp8.333.860.000 Rp8,333,860,000 according to SHT II
sesuai SHT II No. 333/2016 dan senilai No. 333/2016 and amounting to
Rp3.012.440.000 sesuai dengan SHT III Rp3,012,440,000 according to SHT III
No. 02656/2021. No. 02656/2021.
i. Satu bidang tanah SHGB No. 82 i. A plot of land with SHGB No. 82 dated
tanggal 20 Oktober 1988 sampai October 20, 1988 to April 13, 2028, an
dengan 13 April 2028, seluas 2.013 m2, area of 2,013 sqm, located in Kelurahan
terletak di Kelurahan Kalirungkut, Kota Kalirungkut, Surabaya City, East Java,
Surabaya, Jawa Timur, atas nama on behalf of the Company amounting
Perusahaan senilai Rp2.027.710.000 to Rp2,027,710,000 according to SHT I
sesuai dengan SHT I No. 4772/2001, No. 4772/2001, amounting to
senilai Rp2.474.390.000 sesuai Rp2,474,390,000 according to SHT II
dengan SHT II No. 2948/2007, senilai No. 2948/2007, amounting to
Rp10.571.030.000 sesuai dengan SHT Rp10,571,030,000 according to SHT III
III No. 00621/2016 dan senilai No. 00621/2016 and amounting to
Rp13.097.870.000 sesuai dengan SHT Rp13,097,870,000 according to SHT IV
IV No. 02087/2021. No. 02087/202.
j. Satu bidang tanah SHGB No. 2 j. A plot of land with SHGB No. 2 dated
tanggal 25 Juni 1997 sampai dengan 7 June 25, 1997 until October 7, 2036, an
Oktober 2036, seluas 1.000 m2, terletak area of 1,000 sqm, located in Kelurahan
di Kelurahan Pasir Panjang, Kecamatan Pasir Panjang, Kecamatan Kota Lama,
Kota Lama, Kota Kupang, Nusa Kupang City, East Nusa Tenggara, on
Tenggara Timur, atas nama behalf of the Company amounting to
Perusahaan senilai Rp 402.860.000 Rp402,860,000 according to SHT I No.
sesuai dengan SHT I No. 390/2001 dan 390/2001 and amount to
senilai Rp636.540.000 sesuai dengan Rp636,540,000 according to SHT II
SHT II No. 239/2007 senilai No. 239/2007 amounting to
Rp3.085.070.000 sesuai dengan SHT Rp3,085,070,000 according to SHT III
III No. 1387/2015 dan senilai No. 1387/2015 and amounting to
Rp2.359.530.000 sesuai dengan SHT IV Rp2,359,530,000 according to SHT IV
No. 00968/2021. No. 00968/2021.
k. Satu bidang tanah SHGB No. 24 k. A plot of land with SHGB No. 24 dated
tanggal 24 Oktober 1997 sampai October 24, 1997 until October 7, 2036,
dengan 7 Oktober 2036, seluas 595 m2, an area of 595 sqm, located in
- 138 -
Page 136
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
terletak di Kelurahan Oesapa Barat, Kelurahan Oesapa Barat, Kecamatan
Kecamatan Kelapa Lima, Kota Kupang, Kelapa Lima, Kupang City, East Nusa
Nusa Tenggara Timur, atas nama Tenggara, on behalf of the Company
Perusahaan senilai Rp49.260.000 amounting to Rp49,260,000 according
sesuai dengan SHT I No. 374/2001 dan to SHT I No. 374/2001, amounting to
senilai Rp39.740.000 sesuai dengan Rp39,740,000 according to SHT II No.
SHT II No. 240/2007 dan senilai 240/2007 and amounting to
Rp538.000.000 sesuai dengan SHT Rp538,000,000 according to SHT III
III No. 0970/2021. No. 0970/2021.
l. Satu bidang tanah SHGB No. 13 tanggal l. A plot of land with SHGB No. 13 dated
30 Agustus 2023 sampai dengan 30 August 30, 2023 until August 30, 2043,
Agustus 2043, seluas 4.830 m2, terletak an area of 4,830 sqm, located at Jl. Bumi
di Jl. Bumi 2 Kecamatan Kupang 2, Kecamatan Kupang Tengah, Kupang,
Tengah, Kupang, Nusa Tenggara Timur, East Nusa Tenggara, on behalf
atas nama Perusahaan senilai of the Company amounting to
Rp457.590.000 dan Rp288.000.000 Rp457,590,000 dan Rp288.000.000
sesuai dengan SHT I No. 375/2001. according to SHT I No. 375/2001..
m. Satu bidang tanah SHGB No. 14 tanggal m. A plot of land with SHGB No. 14 dated
30 Agustus 2023 sampai dengan 30 August 30, 2023 until August 30, 2043,
Agustus 2043, seluas 4.800 m2, terletak an area of 4,800 sqm, located at Jl. Bumi
di Jl. Bumi 2 Kecamatan Kelapa Lima, 2, Kecamatan Kelapa Lima, Kupang,
Kupang, Nusa Tenggara Timur, atas East Nusa Tenggara, on behalf of the
nama Perusahaan senilai Company amounting to Rp602,410,000
Rp602.410.000 sesuai dengan SHT II according to SHT II No. 238/2007 and
No. 238/2007 dan senilai amounting Rp7,828,880,000 according
Rp7.828.880.000 sesuai dengan to SHT III No. 1386/2015 and
SHT III No. 1386/2015 dan senilai amounting to Rp4,552,120,000
Rp4.552.120.000 sesuai dengan SHT IV according to SHT IV No. 00969/2021.
No. 00969/2021.
n. Satu bidang tanah SHGB No. 24 n. A plot of land with SHGB No. 24 dated
tanggal 11 Juni 1993 sampai dengan 25 June 11, 1993 until May 25, 2013, an
Mei 2013, seluas 276 m2, terletak di area of 276 sqm, located in Kelurahan
Kelurahan Tikala Ares, Kecamatan Tikala Ares, Kecamatan Wenang,
Wenang, Kota Manado, Sulawesi Utara, Manado, North Sulawesi, on behalf of
atas nama Perusahaan senilai the Company amounting to
Rp263.530.000, sesuai dengan SHT I Rp263,530,000 according to SHT I
No. 737/2001 dan senilai No. 737/2001 and amounting to
Rp121.670.000, sesuai dengan SHT II Rp121,670,000 according to SHT II
No. 667/2007. SHGB tersebut telah No. 667/2007. The land right (SHGB)
diperpanjang sampai dengan 25 Mei has been extended until May 25, 2033
2033 dan senilai Rp 1.704.800.000 and amounting to Rp 1,704,800,000
sesuai dengan SHT III No. 00984/2021. according to SHT III No.
00984/2021.
o. Satu bidang tanah SHGB No. 1 o. A plot of land with SHGB No. 1 dated
tanggal 7 Januari 1992 sampai dengan January 7, 1992 until December 28,
28 Desember 2040, seluas 4.040 m2, 2040, an area of 4,040 sqm, located in
terletak di Desa Cileunyi Wetan, Desa Cileunyi Wetan, Kecamatan
Kecamatan Cileunyi, Kabupaten Cileunyi, Kabupaten Bandung, West
Bandung, Jawa Barat, atas nama Java, on behalf of the Company
Perusahaan senilai Rp1.516.520.000, amounting to Rp1,516,520,000
sesuai dengan SHT I No. 2927/2001, according to SHT I No. 2927/2001,
senilai Rp994.180.000 sesuai dengan amounting to Rp994,180,000
SHT II No. 1613/2007 dan senilai according to SHT II No. 1613/2007
Rp3.182.880.000 sesuai dengan and amounting to Rp3,182,880,000
SHT III No. 10710/2015 dan senilai according to SHT III No. 10710/2015
Rp5.806.420.000 sesuai dengan SHT IV and amounting to Rp5,806,420,000
No. 07540/2021. Tanah yang according to SHT IV No. 07540/2021.
dijaminkan termasuk bangunan dan Land which is pledged as collateral
segala sesuatu yang berada di atas consisted of buildings and related things
tanah tersebut baik yang telah ada already existing in the land, or to will be
maupun yang akan ada. exist there.
- 139 -
Page 137
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
p. Satu bidang tanah SHGB No. 30 p. A plot of land with SHGB No. 30 dated
tanggal 26 Januari 2007 sampai dengan January 26, 2007 until January 26,
26 Januari 2027, seluas 1.250 m2, 2027, an area of 1,250 sqm, located in
terletak di Kelurahan Sumerta, Kelurahan Sumerta, Kecamatan
Kecamatan Denpasar Timur, Bali, atas Denpasar Timur, Bali, on behalf of the
nama Perusahaan senilai Company amounting to
Rp3.404.000.000 sesuai dengan SHT I Rp3,404,000,000 according to SHT
No. 2012/2007 senilai I No. 2012/2007 amounting to
Rp18.705.400.000 sesuai dengan SHT Rp18,705,400,000 according to SHT II
II No. 01546/2015 dan senilai No. 01546/2015 and amounting to
Rp38.600.000 sesuai dengan SHT III Rp38,600,000 according to SHT III
No. 03339/2021. Tanah yang No. 03339/2021. Land which is pledged
dijaminkan termasuk bangunan dan as collateral consisted of buildings and
segala sesuatu yang berada di atas related things already existing in the
tanah tersebut, baik yang telah ada land, or to will be exist there.
maupun yang akan ada.
q. Satu bidang tanah SHGB No. 1 q. A plot of land with SHGB No. 1 dated
tanggal 13 November 1987 sampai November 13, 1987 until October 13,
dengan 13 Oktober 2027, seluas 1.905 2027, an area of 1,905 sqm, located in
m2, terletak di Jl. P. Antasari No. 1/4, Jl. P. Antasari No. 1/4, Tanjung Baru,
Tanjung Baru, Bandar Lampung atas Bandar Lampung, on behalf of
nama Perusahaan senilai Rp30.000.000 the Company amounting to
sesuai dengan S. Hip No. 3181 tanggal Rp30,000,000 according to S. Hip No.
13 September 1989, senilai 3181 dated September 13, 1989,
Rp2.222.100.000 sesuai dengan SHT amounting to Rp2,222,100,000
II No. 01057/2007 dan senilai according to SHT II No. 01057/2007 and
Rp3.642.670.000 sesuai dengan SHT amounting to Rp3,642,670,000
III No. 02119/2016 dan senilai according to SHT III No. 02119/2016
Rp2.993.230.000 sesuai dengan SHT IV and amounting to Rp2,993,230,000
No. 01882/2021. according to SHT IV No. 01882/2021.
r. Kendaraan bermotor yang terdiri dari 1 r. Vehicles consisting of 1 (one) unit VW
(satu) unit VW Caravelle 2.0 tahun 2012, Caravelle 2.0 year 2012 tied by fiduciary
yang diikat fidusia sesuai Akta in accordance to Fiduciary Guarantee
Pemberian Jaminan Fidusia Atas Deed No. W.10.00426020.AH.05.01
Kendaraan No. W.10.00426020. dated October 26, 2015 amounting
AH.05.01 tanggal 26 Oktober 2015 to Rp620,000,000.
senilai Rp620.000.000.
• PT Bank Rakyat Indonesia (Persero) Tbk, • PT Bank Rakyat Indonesia (Persero) Tbk,
jaminan berupa sebidang tanah dengan collateral in the form of a piece of land with
SHGB No. 655 dengan masa berlaku dari land right (SHGB) No. 655 dated
tanggal 7 Januari 1992 sampai dengan 8 Mei January 7, 1992 until May 8, 2033 that have
2033 yang telah diikat hak tanggungan been tied with its guarantee rights amounting
dengan nilai Rp16.186.000.000 sesuai to Rp16,186,000,000 according to SHT I No.
dengan SHT I No. 8952/2010 tanggal 8952/2010 dated September 30, 2010
30 September 2010, senilai amounting to Rp8,814,000,000 according to
Rp8.814.000.000 sesuai dengan SHT II No. SHT II No. 6490/2015 dated Juny 24, 2015
6490/2015 tanggal 24 Juni 2015 dan senilai and amounting to Rp30,000,000,000
Rp30.000.000.000 sesuai dengan SHT III according to SHT III No 3982/2023 dated
No. 3982/2023 tanggal 11 April 2023. April 11, 2023.
Amortisasi diskonto untuk tahun yang berakhir pada Amortization of discount for the year ended March 31,
31 Maret 2024 sebesar Rp649.021.861.757, diakui 2024 amounted to Rp649,021,861,757 which is
sebagai bagian dari beban keuangan pada laporan recognized as part of financial expenses in the profit
laba rugi dan penghasilan komprehensif lain. and loss statement and other comprehensive income.
Didalam utang PT Bank Syariah Indonesia Tbk jangka In PT Bank Syariah Indonesias Tbk’s long-term bank
panjang tanggal 31 Maret 2024 dan debt dated March 31, 2024 and December 31, 2023,
31 Desember 2023 termasuk masing-masing sebesar including Rp485,928,303,308 and
Rp485.928.303.308 dan Rp485.928.232.951 Rp485,928,232,951 respectively, they are business
merupakan utang usaha yang menjadi jaminan fasilitas debts that guarantee the SCF facilities owned by
SCF yang dimiliki vendor yang telah jatuh tempo. vendors that have matured.
- 140 -
Page 138
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pada tahun 2021 Perusahaan melakukan In 2021, the Company restructured long-term bank
restrukturisasi atas pinjaman bank jangka panjang loans pursuant to deed Master Restructuring
sesuai dengan akta perjanjian Master Restructuring Agreement (MRA) No. 40 dated August 25, 2021.
Agreement (MRA) induk No. 40 tanggal 25 Agustus
2021.
Berdasarkan surat BNI ke Perusahaan Nomor: Based on BNI's letter to the Company Number:
SSF/5.3/492 tanggal 20 Februari 2024 perihal SSF/5.3/492 dated 20 February 2024 regarding
Penyampaian Persetujuan Kreditur atas Submission of Creditor Approval for the MRA
Permohonan Restrukturisasi MRA (Term Sheet 1 Restructuring Application (Term Sheet 1 September
September 2023) a.n. PT Waskita Karya (Persero) 2023) a.n. PT Waskita Karya (Persero) Tbk. Based
Tbk. Berdasarkan surat tersebut Kreditur MRA telah on this letter, MRA Creditors have given their
memberikan persetujuan dengan syarat dan approval to the terms and conditions agreed upon by
ketentuan yang telah disepakati Perusahaan dan the Company and MRA Creditors.
Kreditur MRA.
Utang bank Perusahaan yang disajikan merupakan The Company's bank debt presented is the result of
hasil restrukturisasi pinjaman bank dengan bank loan restructuring with fair value calculations
perhitungan nilai wajar dilakukan oleh akuntan carried out by other independent accountants. The
independen lain. Selisih antara nilai wajar dengan difference between fair value and the value of the
nilai utang bank yang direstrukturisasi dicatat sebagai restructured bank's debt is recorded as restructured
laba hasil restrukturisasi. profit.
Perhitungan nilai wajar atas restrukturisasi dilakukan The calculation of the fair value of the restructuring is
pada tahun berjalan (catatan 4). carried out in the current year (note 4).
Pihak Ketiga Third Parties
Perjanjian Restrukturisasi Induk Master Restructuring Agreement
Berdasarkan Perjanjian Aksesi pada tanggal Based on the Accession Agreement as September
15 September 2021, Pihak-pihak yang melakukan 15, 2021, the Parties carrying out
Aksesi, yang terdiri dari PT Bank BNP Paribas the Accession, consist of PT Bank BNP Paribas
Indonesia, PT Bank BTPN Tbk, PT Bank China Indonesia, PT Bank BTPN Tbk, PT Bank China
Construction Bank Indonesia Tbk, Construction Bank Indonesia Tbk,
PT Bank CTBC Indonesia, PT Bank KEB Hana PT Bank CTBC Indonesia, PT Bank KEB Hana
Indonesia, PT Maybank Indonesia Tbk, PT Bank Indonesia, PT Maybank Indonesia Tbk, PT Bank
OCBC NISP Tbk, Bank of China Ltd, OCBC NISP Tbk, Bank of China Ltd, PT Bank Pan
PT Bank Pan Indonesia Tbk, PT Bank Permata Indonesia Tbk, PT Bank Permata Indonesia Tbk, PT
Indonesia Tbk, PT Bank QNB Indonesia Tbk, Bank QNB Indonesia Tbk, PT Bank Resona
PT Bank Resona Perdania, PT Bank SBI Indonesia, Perdania, PT Bank SBI Indonesia,
PT Bank Shinhan Indonesia dan PT Bank UOB PT Bank Shinhan Indonesia and PT Bank UOB
Indonesia, menyatakan untuk menjadi pihak dalam Indonesia, declares to be a party to the Master
Perjanjian Restrukturisasi Induk dan berjanji untuk Restructuring Agreement and undertakes to carry out
melaksanakan seluruh kewajiban yang dinyatakan all obligations stated in the Master Restructuring
dalam Perjanjian Restrukturisasi Induk. Agreement.
Pihak-pihak Bank setuju melakukan resrukturisasi The Bank's parties agreed to restructure
atas kewajiban-kewajiban pembayaran Perusahaan the Company's payment liabilities in relation to the
sehubungan dengan fasilitas-fasilitas pembiayaan financing facilities provided by the banks with total
yang diberikan oleh pihak-pihak bank dengan jumlah amount of Rp29,252,309,664,899.
keseluruhan sebesar Rp29.252.309.664.899.
Pada tahun 2021 Perusahaan melakukan In 2021, the Company restructured long-term bank
restrukturisasi atas pinjaman bank jangka panjang loans pursuant to deed Master Restructuring
sesuai dengan akta perjanjian Master Restructuring Agreement (MRA) No. 40 dated August 25, 2021.
Agreement (MRA) induk No. 40 tanggal 25 Agustus
2021.
Utang bank Perusahaan yang disajikan merupakan The Company's bank debt presented is the result of
hasil restrukturisasi pinjaman bank dengan bank loan restructuring with fair value calculations
perhitungan nilai wajar dilakukan oleh akuntan carried out by other independent accountants. The
independen lain. Selisih antara nilai wajar dengan difference between fair value and the value of the
- 141 -
Page 139
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
nilai utang bank yang direstrukturisasi dicatat sebagai restructured bank's debt is recorded as restructured
laba hasil restrukturisasi. profit.
Perhitungan nilai wajar atas restrukturisasi dilakukan The calculation of the fair value of the restructuring is
pada tahun berjalan (catatan 4). carried out in the current year (note 4).
Entitas Anak Subsidiaries
Pada tahun 2021 - 2023 Entitas Anak masing-masing In 2021 - 2023, the Subsidiaries of WBP, WKR, WKI
WBP, WKR, WKI dan PBTR melakukan and PBTR will restructure long-term bank loans.
restrukturisasi atas pinjaman bank jangka panjang.
Utang bank entias anak yang disajikan merupakan The subsidiary’s bank loan presented is the result of
hasil restrukturisasi pinjaman bank dengan bank loan restructuring with fair value calculations
perhitungan nilai wajar dilakukan oleh akuntan carried out by other independent accountants. The
independen lain. Selisih antara nilai wajar dengan difference between fair value and the value of
nilai utang bank yang direstrukturisasi dicatat sebagai restructured bank debt is recorded as the profit (loss)
laba (rugi) hasil restrukturisasi. resulting from the restructuring.
Perhitungan nilai wajar atas restrukturisasi WKR, The fair value calculation for the restructuring of
WKI dan PBTR dilakukan pada tahun berjalan WKR, WKI and PBTR is carried out in the current year
(catatan 4). (note 4).
Perusahaan The Company
Pihak Berelasi Related Parties
2. Sindikasi Kredit Modal Kerja 2. Working Capital Syndication Credit
PT Bank Mandiri (Persero) Tbk, PT Bank BNI PT Bank Mandiri (Persero) Tbk, PT Bank BNI
(Persero) Tbk, PT Bank BRI (Persero) Tbk, PT (Persero) Tbk, PT Bank BRI (Persero) Tbk, PT
Bank Pembangunan Daerah Jawa Barat dan Bank Pembangunan Daerah Jawa Barat dan
Banten Tbk dan PT Bank Pembangunan Banten Tbk and PT Bank Pembangunan
Daerah Sumut Daerah Sumut
Pinjaman Bank - Sindikasi Modal Kerja
Fasilitas Tanggal Tingkat bunga per
Jenis fasilitas/ maksimum/ perjanjian/ Tanggal jatuh tahun/ 31 Maret/ 31 Desember/
Kreditur/ Entitas/ Type of Maximum Agreement tempo/ Interest rate per March 31, December 31,
Creditors Entities facilities facility date Maturity date annum 2024 2023
PT Bank Mandiri Perusahaan/ The Sindikasi Kredit 8.076.463.000.000 25 Oktober/ Maksimal tiga Suku bunga 4.628.522.570.724 4.624.166.434.872
(Persero) Tbk, Company Modal Kerja/ October 25, tahun sejak sebesar
PT Bank Negara Working Capital 2021 kontrak referance rate
Indonesia (Persero) Syndication perjanjian ditambah margin/
Tbk, PT Bank Rakyat Credit ditandatangani/ The interest rate
Indonesia (Persero) A maximum of is the reference
Tbk three years after rate plus margin
the contract
agreement is
signed
Berdasarkan akta Notaris Ashoya Ratam, S.H., Based on the deed of Notary Ashoya Ratam,
M.Kn No. 38 tanggal 25 Oktober 2021, S.H., M.Kn. No. 38 dated October 25, 2021,
Perusahaan menandatangani perjanjian Kredit the Company signed a Syndicated Loan
Sindikasi dengan PT Bank Mandiri (Persero) agreement with PT Bank Mandiri (Persero) Tbk,
Tbk, PT Bank BNI (Persero) Tbk dan PT Bank BNI (Persero) Tbk and PT Bank BRI
PT Bank BRI (Persero) Tbk. Bank Kreditur (Persero) Tbk. The creditor bank provides
tersebut memberikan fasilitas kredit sebesar a credit facility of Rp8,076,463,000,000 with
Rp8.076.463.000.000 dengan sublimit Non Cash a Non-Cash Loan sublimit of up to
Loan sampai dengan Rp6.268.359.000.000 dan Rp6,268,359,000,000 and Supplier Financing
Supplier Financing sampai dengan sublimit of up to Rp6,268,359,000,000.
Rp6.268.359.000.000. Jangka waktu pinjaman The term of this loan is a maximum of three years
ini maksimal tiga tahun sejak penandatanganan from the signing of the contract agreement and
kontrak perjanjian dan suku bunga sebesar the interest rate is the reference rate plus margin.
referance rate ditambah margin. Fasilitas Kredit This credit facility is provided by creditors to be
ini diberikan Kreditur untuk digunakan sebagai used as working capital for project
modal kerja untuk pelaksaan Proyek dalam implementation in the context of the National
rangka Program Pemulihan Ekonomi Nasional. Economic Recovery Program. This loan is
Pinjaman ini dijamin oleh Jaminan guaranteed by Government Guarantee in
Pemerintah sesuai ketentuan Peraturan Menteri accordance with the Regulation of the Minister of
- 142 -
Page 140
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Keuangan Republik Indonesia No. Finance of the Republic of Indonesia No.
211/PMK.08/2020. 211/PMK.08/2020.
Berdasarkan akta pemindahan tanggal Based on the deed of transfer dated
28 Juni 2022, PT Bank BNI (Persero) Tbk June 28, 2022, PT Bank BNI (Persero) Tbk
mengalihkan sebagian hak-haknya dan transferred its rights and obligations based on
kewajibannya bedasarkan Perjanjian Kredit the Syndicated Credit Agreement to Bank
Sindikasi kepada Bank Pembangunan Daerah Pembangunan Daerah Jawa Barat Tbk and
Jawa Barat dan Banten Tbk dan PT Bank Sumut. Obligations and rights taken
PT Bank Sumut. Kewajiban dan hak yang diambil over by Bank Pembangunan Daerah Jawa Barat
alih Bank Pembangunan Daerah Jawa Barat dan Tbk mainly include commitments under the
Banten Tbk. terutama meliputi komitmen Syndicated Credit Agreement amounting to
berdasarkan Perjanjian Kredit Sindikasi sebesar Rp118,608,226,840, the rights to the loan
Rp118.608.226.840, hak atas jumlah pinjaman amount that have been disbursed and have not
yang telah dicairkan dan belum dibayarkan been paid by the Company amounting to
Perusahaan sebesar Rp131.391.773.160 dan Rp131,391,773,160 and interest based on
bunga berdasarkan perjanjian Kredit Sindikasi. the Syndicated Credit agreement.
Kewajiban dan hak yang diambil alih PT Bank The obligations and rights taken over by PT Bank
Sumut terutama meliputi komitmen berdasarkan Sumut mainly include commitments under
Perjanjian Kredit Sindikasi sebesar the Syndicated Credit Agreement amounting to
Rp35.754.841.279, hak atas jumlah pinjaman Rp35,754,841,279, rights to the loan amount that
yang telah dicairkan dan belum dibayarkan has been disbursed and has not been paid by the
Perusahaan sebesar Rp64.245.158.721 dan Company amounting to Rp64,245,158,721 and
bunga berdasarkan perjanjian Kredit Sindikasi. interest based on the Syndicated Credit
agreement.
Pihak Ketiga Third Parties
Pinjaman Bank - Sindikasi Modal Kerja
Fasilitas Tanggal Tingkat bunga per
Jenis fasilitas/ maksimum/ perjanjian/ Tanggal jatuh tahun/ 31 Maret/ 31 Desember/
Kreditur/ Entitas/ Type of Maximum Agreement tempo/ Interest rate per March 31, December 31,
Creditors Entities facilities facility date Maturity date annum 2023 2023
PT Bank Perusahaan/ The Sindikasi Kredit 8.076.463.000.000 25 Oktober/ Maksimal tiga Suku bunga 653.972.238.382 653.972.238.382
Pembangunan Company Modal Kerja/ October 25, tahun sejak sebesar
Daerah Jawa Barat Working Capital 2021 kontrak referance rate
dan Banten Tbk dan Syndication perjanjian ditambah margin/
PT Bank Credit ditandatangani/ The interest rate
Pembangunan A maximum of is the reference
Daerah Sumatera three years after rate plus margin
Utara the contract
agreement is
signed
Berdasarkan akta Notaris Ashoya Ratam, S.H., Based on the deed of Notary Ashoya Ratam,
M.Kn No. 38 tanggal 25 Oktober 2021, S.H., M.Kn. No. 38 dated October 25, 2021,
Perusahaan menandatangani perjanjian Kredit the Company signed a Syndicated Loan
Sindikasi dengan PT Bank Mandiri (Persero) agreement with PT Bank Mandiri (Persero) Tbk,
Tbk, PT Bank BNI (Persero) Tbk dan PT Bank BNI (Persero) Tbk and PT Bank BRI
PT Bank BRI (Persero) Tbk. Bank Kreditur (Persero) Tbk. The creditor bank provides a
tersebut memberikan fasilitas kredit sebesar credit facility of Rp8,076,463,000,000 with a Non-
Rp8.076.463.000.000 dengan Sublimit Non Cash Loan sublimit of up to
Cash Loan sampai dengan Rp6,268,359,000,000 and Supplier Financing
Rp6.268.359.000.000 dan Supplier Financing sublimit of up to Rp6,268,359,000,000. The term
sampai dengan Rp6.268.359.000.000. Jangka of this loan is a maximum of three years from
waktu pinjaman ini maksimal tiga tahun sejak the signing of the contract agreement and
penandatanganan kontrak perjanjian dan suku the interest rate is the reference rate plus margin.
bunga sebesar referance rate ditambah margin. This credit facility is provided by creditors to be
Fasilitas Kredit ini diberikan Kreditur untuk used as working capital for project
digunakan sebagai modal kerja untuk pelaksaan implementation in the context of the National
Proyek dalam rangka Program Pemulihan Economic Recovery Program. This loan is
Ekonomi Nasional. Pinjaman ini dijamin oleh guaranteed by Government Guarantee In
Jaminan Pemerintah sesuai ketentuan Peraturan accordance with the Regulation of the Minister of
Menteri Keuangan Republik Indonesia No. Finance of the Republic of Indonesia No.
211/PMK.08/2020. 211/PMK.08/2020.
Berdasarkan akta pemindahan tanggal Based on the deed of transfer dated
28 Juni 2022, PT Bank BNI (Persero) Tbk June 28, 2022, PT Bank BNI (Persero) Tbk
mengalihkan sebagian hak-haknya dan transferred its rights and obligations based on
kewajibannya bedasarkan Perjanjian Kredit the Syndicated Credit Agreement to Bank
- 143 -
Page 141
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Sindikasi kepada Bank Pembangunan Daerah Pembangunan Daerah Jawa Barat Tbk and
Jawa Barat dan Banten Tbk dan PT Bank Sumut. Obligations and rights taken
PT Bank Sumut. Kewajiban dan hak yang diambil over by Bank Pembangunan Daerah Jawa Barat
alih Bank Pembangunan Daerah Jawa Barat dan Tbk mainly include commitments under
Banten Tbk. terutama meliputi komitmen the Syndicated Credit Agreement amounting to
berdasarkan Perjanjian Kredit Sindikasi sebesar Rp118,608,226,840, the rights to the loan
Rp118.608.226.840, hak atas jumlah pinjaman amount that have been disbursed and have not
yang telah dicairkan dan belum dibayarkan been paid by the Company amounting to
Perusahaan sebesar Rp131.391.773.160 dan Rp131,391,773,160 and interest based on
bunga berdasarkan perjanjian Kredit Sindikasi. the Syndicated Credit agreement.
Kewajiban dan hak yang diambil alih PT Bank The obligations and rights taken over by PT Bank
Sumut terutama meliputi komitmen berdasarkan Sumut mainly include commitments under the
Perjanjian Kredit Sindikasi sebesar Syndicated Credit Agreement amounting to
Rp35.754.841.279, hak atas jumlah pinjaman Rp35,754,841,279, rights to the loan amount that
yang telah dicairkan dan belum dibayarkan has been disbursed and has not been paid by the
Perusahaan sebesar Rp64.245.158.721 dan Company amounting to Rp64,245,158,721 and
bunga berdasarkan perjanjian Kredit Sindikasi. interest based on the Syndicated Credit
agreement.
Entitas Anak - WTR Subsidiary - WTR
Pihak Berelasi Related Parties
1. PT Bank Negara Indonesia (Persero) Tbk 1. PT Bank Negara Indonesia (Persero) Tbk
a. PBTR a. PBTR
Berdasarkan Akta Notaris Ariani Lakhsmijati Based on Notarial Deed No.37 dated
Rachim, S.H., No. 37 tanggal 24 Mei 2017 May 24, Based on Notarial Deed No. 37 of
dan Akta Notaris Ariani Lakhsmijati Rachim, Ariani Lakhsmijati Rachim, S.H., dated
S.H., No. 48 tanggal 27 Agustus 2018, PBTR May 24, 2017 and Notarial Deed No. 48 of
telah menandatangani perjanjian Kredit Ariani Lakhsmijati Rachim S.H., dated
Sindikasi dengan PT Bank Negara Indonesia August 27, 2018, PBTR entered into
(Persero) Tbk, PT Bank Panin Tbk, PT Bank Syndicated Loan Agreement with PT Bank
Papua, PT Bank Pembangunan Daerah Negara Indonesia (Persero) Tbk, PT Bank
Sulawesi Selatan dan Sulawesi Barat, PT Panin Tbk, PT Bank Papua,
Bank Arta Graha Internasional Tbk, PT Bank Pembangunan Daerah Sulawesi
PT Bank Pembangunan Daerah Maluku dan Selatan dan Sulawesi Barat, PT Bank Arta
Maluku Utara, PT Bank Pembangunan Graha Internasional Tbk, PT Bank
Daerah Daerah Istimewa Yogyakarta, Pembangunan Daerah Maluku danMaluku
PT Bank Pembangunan Daerah Jambi, Utara, PT Bank Pembangunan Daerah
PT Bank Nagari, PT Bank Pembangunan Daerah Istimewa Yogyakarta,
Daerah Kalimantan Tengah, PT Bank Pembangunan Daerah Jambi,
PT Bank Pembangunan Daerah PT Bank Nagari, PT Bank Pembangunan
Bali, PT Bank Pembangunan Daerah Daerah Kalimantan Tengah, PT Bank
Sumatera Utara, PT Bank Pembangunan Pembangunan Daerah Bali, PT Bank
Daerah Jawa Tengah, PT Bank Negara Pembangunan Daerah Sumatera Utara,
Indonesia Syariah, PT Bank Jabar Banten PT Bank Pembangunan Daerah Jawa
Syariah, PT Bank Aceh Syariah, Tengah, PT Bank Negara Indonesia Syariah,
PT Indonesia Infrastructure Finance, PT Bank Jabar Banten Syariah,
PT Bank Riau Kepri, Bank Sumsel Babel, PT PT Bank Aceh Syariah, PT Indonesia
Pembangunan Daerah Kalimantan Selatan, Infrastructure Finance, PT Bank Riau Kepri,
PT Pembangunan Daerah Sulawesi Tengah, Bank Sumsel Babel, PT Pembangunan
PT Bank Pembangunan Daerah Istimewa Daerah Kalimantan Selatan,
Yogyakarta Syariah, PT Pembangunan Daerah Sulawesi Tengah,
PT Bank Riau Kepri Syariah dan PT Bank PT Bank Pembangunan Daerah Istimewa
Kalsel Syariah. Yogyakarta Syariah, PT Bank Riau Kepri
Syariah dan PT Bank Kalsel Syariah.
Jangka waktu kredit investasi dan kredit The investment credit and interest during
interest during construction (IDC) adalah 162 construction credit term loan was 162
bulan atau 14 tahun termasuk masa months or 14 years including a grac period
tenggang 24 bulan atau 2 tahun sejak of 24 months or 2 years from the effective
- 144 -
Page 142
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
tanggal efektif. Suku bunga yang dikenakan date. The interest rate of this loan is 10% p.a
adalah sebesar 10% per tahun yang which represents the weighted average
merupakan rata-rata tertimbang atas dasar interest rate based on the Reference Rate
suku bunga yaitu Reference Rate (LPS) (LPS) plus Margin.
ditambah dengan Margin.
Kedua puluh empat bank tersebut These twenty four banks provided a credit
memberikan fasilitas kredit maksimum facility with a maximum credit facility limit
sebesar Rp5.248.541.000.000 yang terdiri of Rp5,248,541,000,000 which consists of
dari Kredit Investasi dan Kredit Bunga masa Investment Credit and Interest During
Konstruksi (IDC) masing-masing Construction (IDC) amounting
sebesar Rp4.919.070.000.000 dan to Rp4,919,070,000,000 and
Rp329.471.000.000. Kedua fasilitas tersebut Rp329,471,000,000, respectively. Both
diberikan untuk keperluan pembangunan facilities are provided for the development of
Jalan Tol Ruas Pemalang - Batang. Pemalang - Batang Toll Road.
Pada tanggal 21 Desember 2021, On December 21, 2021, PT Bank Negara
PT Bank Negara Indonesia Persero (Tbk) Indonesia Persero (Tbk) issued a letter No:
memberikan surat dengan SSK/3.2/4251 regarding the approval of
No: SSK/3.2/4251 mengenai Persetujuan the change in the projected syndicated credit
Perubahan Fasilitas Kredit Sindikasi facility for the Pemalang Batang Toll Road
proyeksi jalan Tol Ruas Pemalang Batang with the following terms and conditions:
dengan ketentuan dan persyaratan sebagai
berikut:
1. Project Cost: Maksimal 1. Project Cost: Maximum
Rp7.406.794.586.675. Rp7,406,794,586,675.
2. Komposisi pembiayaan - Kl - Self 2. Financing Material - Kl - Self-financing =
financing = 74,63% : 25,37%. 74.63% : 25.37%.
3. Tujuan pembiayaan: 3. Purpose of financing:
- Restrukturisasi pinjaman debitur - Debitor credit restructuring used to
yang digunakan untuk membiayai finance 74.63% of the investment
74,63% Biaya Investasi Proyek costs for the Pemalang - Batang Toll
Pembangunan Jalan Tol Ruas Road Construction Project.
Pemalang - Batang.
- Pembayaran utang kontraktor - Payment of contractor debt and/or
dan/atau utang BLU dan/atau biaya BLU debt and/or road maintenance
pemeliharaan jalan tol sehubungan costs in connection with
dengan pengelolaan jalan tol ruas the management of the Pemalang -
Pemalang - Batang sepanjang ± Batang toll road along ± 39.2KM (the
39,2 KM (“Proyek”). “Project”).
4. Fasilitas pembiayaan : Kredit Investasi 4. Financing facilities: Investment Credit
yang terdiri dari 3 Tranchers yaitu : which consists of 3 stages, namely:
a. Tranche A : pembiayaan investasi a. Tranche
H A: investment financing
dengan skema staging interest with a staging interest scheme
(skema bunga berjenjang). (tiered interest scheme).
b. Tranche B : pembiayaan investasi b. Tranche B : investment financing
dengan skema deferred interest with deferred interest scheme
(penundaan bunga sebagian). (partial interest deferral).
c. Tranche C : pembiayaan baru dari c. Tranche C : new financing from SMI
SMI Syariah untuk keperluan Syariah for investment purposes
pembiayaan investasi dengan with a profitsharing scheme to
skema bagi hasil step up dan increase financing and partly.
ditangguhkan sebagian.
5. Limit fasititas : Total limit KI dan KI IDC 5. Facility limit: The total limit of KI and KI
maksimal sebesar 74,63% dari Project IDC is a maximum of 74.63% of the
Cost. Sesuai outstanding pokok Project Cost. In accordance with the
pinjaman sindikasi dan adanya principal of the syndicated loan and
tambahan fasilitas dari SMI Syariah additional facilities from SMI Syariah
- 145 -
Page 143
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
atau maksimal sebesar or a maximum of
Rp5.649.094.903.160. Rp5,649.094,903,160.
6. Jangka waktu fasilitas: 6. Term of Facility:
- Tranche A dan Tranche B Maksimal - Tranche A and Tranche B Maximum
15 tahun sejak penandatangan of 15 years since the signing of the
Amendemen perjanjian kredit atau credit agreement amendment or
berakhir pada tahun 2036. ending in 2036.
- Tranche C Maksimal 18 tahun sejak - Tranche C Maximum 18 years from
penandatanganan Amendemen signing of the Amendment to the
perjanjian pembiayaan atau financing agreement or ending in
berakhir pada tahun 2039. 2039.
7. Grace Period: Tranche C 6 tahun sejak 7. Grade Period: Tranche C 6 years from
di tandatangani perjanjian kredit the signing of the financing credit
pembiayaan hingga Oktober 2027. agreement until October 2027.
8. Masa penarikan: Tranche C 4 tahun 8. Withdrawal Period: Tranche C 4 years
sejak penandatanganan perjanjian from the signing of the financing
pembiayaan atau sesuai pembayaran agreement or according to the payment
utang BLU, dipilih mana yang lebih of BLU debt, whichever occurs first.
dahulu terjadi.
9. Suku bunga/ Bagi Hasil: 9. Interest rate/ Profit sharing:
a. Bunga berjenjang dengan rincian: a. Tiered
H interest with details:
- Tahun 2021 sampai dengan - Year 2021 to 2023 by 5%.
2023 sebesar 5%.
- Tahun 2024 sampai dengan - Year 2024 to 2025 amounting
2025 sebesar 6,25% p.a. to 6.25% p.a.
b. Untuk periode selanjutnya tahun b. ForH the next period from 2026 to
2026 sampai dengan 2036 bunga 2036 the tiered interest will be the
berjenjang menjadi sebesar Reference Rate+Margin or equal to
Reference Rate+Margin atau sama (10.63).
dengan (10,63).
Pinjaman tersebut di atas dijamin dengan The above loans are collateralized by all of toll
seluruh hak konsesi pengusahaan jalan tol, road concessions rights, all invoices and
seluruh tagihan dan pendapatan operational dari operating revenues from toll road management
pengelolaan jalan tol dan usaha usaha lain terkait and other business ventures related to toll road
dengan pengelolaan jalan tol, escrow account, management, escrow accounts, claims for
tagihan atas pendapatan dari hasil klaim income from insurance claims, bank guarantee
asuransi, klaim bank garansi, dan penggantian claims and reimbursement of funds from
dana dari pemerintah, gadai saham milik the government, the shareholders' pledge of
pemegang saham, serta Company guarantee shares, and the Company guarantee of
dari para pemegang saham. Perjanjian pinjaman the shareholders. The loan agreement also
juga mencakup persyaratan tertentu antara lain: covers certain requirements such as: limiting
membatasi hak Perusahaan untuk memperoleh the Company's right to obtain new credits/
kredit/fasilitas baru, mengubah sususan facilities, changing shareholder structure, making
pemegang saham, melakukan perubahan PPJT changes to the PPJT and/or business plan. and
dan atau business plan, serta mengharuskan requires the Company to maintain certain
Perusahaan untuk mempertahankan rasio financial ratios calculated based on the Company
keuangan tertentu yang dihitung berdasarkan financial statement.
laporan keuangan Perusahaan.
Pembatasan penting dalam perjanjian pinjaman The major covenant of this financing include
sindikasi adalah: the following:
• Debt to equity ratio (DER) maksimal 3,5 kali. • Debt to equity ratio (DER) a maximum of 3.5
times
• Debt service coverage ratio (DSCR) lebih • Debt service coverage ratio (DSCR) more
dari 1,0 (satu koma nol) kali selama masa than 1.0 (one point zero) times during the
operasi. operational period.
- 146 -
Page 144
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
• Debt service coverage ratio (DSCR) minimal • Debt service coverage ratio (DSCR) is at
100% mulai tahun 2022. Jika DSCR kurang least 100% starting in 2022. If the DSCR is
dari 1 kali dan pemegang saham melakukan less than 1 time and the shareholders top up
top up atau terdapat saldo kas akhir tahun or there is a cash balance at the end of
sebelumnya sehingga Debitur tidak the previous year so that the debtor does not
mengalami keterlambatan pembayaran experience delays in payment of obligations,
kewajiban, maka debitur tidak dianggap then the debtor is not considered to have
melakukan pelanggaran covenant DSCR. violated the DSCR covenant.
• Menjaga ekuitas selalu positif. • Maintain positif balance of equity.
b. WBW b. WBW
Berdasarkan akta perjanjian kredit sindikasi Based on the syndicated credit agreement
No.53, tanggal 21 Desember 2018, WBW deed No. 53, dated December 21, 2018,
telah menandatangani perjanjian Kredit WBW entered into Loan Syndication with
Sindikasi dengan PT Bank Negara Indonesia PT Bank Negara Indonesia (Persero) Tbk,
(Persero) Tbk, PT Bank Rakyat Indonesia PT Bank Rakyat Indonesia (Persero) Tbk,
(Persero) Tbk, PT Sarana Multi Infrastruktur PT Sarana Multi Infrastruktur (Persero),
(Persero), PT Bank Pembangunan Daerah PT Bank Pembangunan Daerah Jawa Timur
Jawa Timur Tbk, PT Bank Pembangunan Tbk, PT Bank Pembangunan Daerah
Daerah Riau Kepri, PT Bank Pembangunan Riau Kepri, PT Bank Pembangunan Daerah
Daerah Nusa Tenggara Timur, PT Bank Nusa Tenggara Timur, PT Bank
Pembangunan Daerah Maluku dan Maluku Pembangunan Daerah Maluku and
Utara, PT Bank Pembangunan Daerah Maluku Utara, PT Bank Pembangunan
Kalimantan Selatan, PT Bank Pembangunan Daerah Kalimantan Selatan,
Daerah Sumatera Selatan dan Bangka PT Bank Pembangunan Daerah Sumatera
Belitung, PT Bank Pembangunan Daerah Selatan dan Bangka Belitung, PT Bank
Kalimantan Barat, PT Bank Pembangunan Pembangunan Daerah Kalimantan Barat,
Daerah Bengkulu, PT Bank Pembangunan PT Bank Pembangunan Daerah Bengkulu,
Daerah Bali, PT Pembangunan Daerah PT Bank Pembangunan Daerah Bali,
Bank Papua, PT Bank CIMB Niaga Tbk Unit PT Pembangunan Daerah Bank Papua,
usaha Syariah, dan PT Bank Pembangunan PT Bank CIMB Niaga Tbk Business Unit
Daerah Jawa Timur Tbk Unit Usaha Syariah Syariah, and PT Bank Pembangunan
dan Lembaga keuangan non bank lainnya. Daerah Jawa Timur Tbk Business Unit
Syariah and other non banking financial
institution.
Berdasarkan akta No. 49 dan No. 50 tanggal Based on deed No. 49 and No. 50 dated
30 Agustus 2018 oleh H. Bambang August 30, 2018 by H. Bambang Suprianto,
Suprianto, S.H., SpN., MH, WBW telah S.H., SpN., MH, WBW entered into Loan
menandatangani perjanjian Kredit dengan Agreement with PT Bank Tabungan Negara
PT Bank Tabungan Negara (Persero) Tbk. (Persero) Tbk. These banks provided a
Bank tersebut memberikan fasilitas kredit credit Working Capital Loan
sebesar Rp400.000.000.000 dan maksimum Rp400,000,000,000 and maximum credit
sebesar Rp1.125.000.000.000 yang facility limit of Rp1,125,000,000,000. There
merupakan Kredit Modal Kerja (KMK). facilities are provided for the land acquisition
Fasilitas tersebut diberikan untuk bailout for the development of Krian-Legundi
pembiayaan dana talangan pengadaan Bunder-Manyar (KLBM).
tanah proyek Jalan Tol Krian-Legundi-
Bunder-Manyar (KLBM).
Jangka waktu Kredit Modal Kerja (KMK) A credit term loan of 24 months from dated
adalah 24 bulan sejak tanggal of Signing of a credit agreement. The interest
penandatangan perjanjian kredit. Suku rate of this loan is 8.25% effective p.a -
bunga efektif per tahun adalah 8,25% dan adjustable rate. Based on the letter from PT
dapat disesuaikan. Berdasarkan surat dari Bank Tabungan Negara (Persero) Tbk dated
PT Bank Tabungan Negara (Persero) Tbk June 28, 2019 interest rates adjusted to
tanggal 28 Juni 2019 suku bunga kredit 8.50%.
disesuaikan menjadi 8,50%.
Berdasarkan Akta No. 12 tanggal Based on Deed No. 12 date
29 Desember 2020 oleh notaris Gamal December 29, 2020 by notary Gamal
- 147 -
Page 145
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Wahidin, S.H., Perusahaan telah Wahidin, SH., the Company has signed a
menandatangani perjanjian Kredit dengan credit agreement with PT Bank Tabungan
PT Bank Tabungan Negara (Persero) Tbk. Negara (Persero) Tbk. The bank provides a
Bank tersebut memberikan fasilitas kredit revolving credit facility of
revolving sebesar Rp250.000.000.000 dan Rp250,000,000,000 and maximum of
maksimum sebesar Rp368.000.000.000 Rp368,000,000,000 which is a Working
yang merupakan Kredit Modal Kerja (KMK). Capital Credit (KMK). There facilities are
Fasilitas tersebut diberikan untuk provided for the land acquisition bailout for
pembiayaan dana talangan pengadaan the development of Krian-Legundi-Bunder-
tanah proyek Jalan Tol Krian-Legundi- Manyar (KLBM).
Bunder-Manyar (KLBM).
Jangka waktu Kredit Modal Kerja (KMK) Working Capital Credit (KMK) is 24 months
adalah 24 bulan sejak tanggal from he date of signing the credit agreement.
penandatangan perjanjian kredit. Suku Effective interest rate per year is 8.75% and
bunga efektif per tahun adalah 8,75% dan in the event of arrears, a fine of 2% is
apabila terjadi penunggakan dikenakan imposed above the prevailing credit interest
denda 2% diatas suku bunga kredit yang rate.
berlaku.
2. PT Bank Rakyat Indonesia (Persero) Tbk 2. PT Bank Rakyat Indonesia (Persero) Tbk
WBW WBW
WBW telah menandatangani perjanjian WBW obtained a syndication loan
Kredit Sindikasi dengan PT Bank Rakyat agreement with PT Bank Rakyat Indonesia
Indonesia (Persero) Tbk dan lembaga (Persero) Tbk and other banking and non
keuangan perbankan dan non perbankan banking financial institutions.
lainnya.
3. PT Bank BNI Syariah 3. PT Bank BNI Syariah
PBTR PBTR
PBTR telah menandatangani perjanjian PBTR obtained a syndication loan
Kredit Sindikasi dengan PT Bank BNI agreement with PT Bank BNI Syariah and
Syariah dan lembaga keuangan perbankan other banking financial institutions.
lainnya.
4. PT Bank Mandiri Syariah 4. PT Bank Mandiri Syariah
a. Kredit Bank Sindikasi WTTR a. Syndication Bank Credit WTTR
Berdasarkan Akta No. 3 dan 4 tanggal 5 Based on Deed No. 3 and 4 dated October
Oktober 2018 oleh Efran Yuniarto, S.H., 5, 2018 by Efran Yuniarto, S.H., M.Kn.,
M.Kn., Notaris di Jakarta, WTTR dan PT Notary in Jakarta, WTTR and PT Sarana
Sarana Multi Infrastruktur (Persero) - Unit Multi Infrastruktur (Persero) - Unit Usaha
Usaha Syariah, PT Bank Syariah Mandiri, Syariah, PT Bank Syariah Mandiri, PT Bank
PT Bank BPD Jawa Timur - Unit Usaha BPD Jawa Timur - Unit Usaha Syariah,
Syariah, PT Bank Mega Syariah, PT Bank PT Bank Mega Syariah, PT Bank BJB
BJB Syariah menandatangani Perjanjian Syariah entered into Loan Agreement
Kredit dengan fasilitas kredit maksimum providing loan facilities with ceiling of
sebesar Rp1.293.201.000.000. Fasilitas Rp1,293,201,000,000. Loan facilities are
tersebut diberikan untuk keperluan provided for development of Pasuruan -
pembangunan Jalan Tol Ruas Pasuruan - Probolinggo Toll Road.
Probolinggo.
Pinjaman ini dikenakan bunga sebesar 11% This loan bears interest at 11% per annum
per tahun untuk Tranche A1. for Tranche A1.
Pinjaman tersebut di atas dijamin dengan The above loans are collateralized by all of
seluruh hak konsesi pengusahaan jalan tol, toll road concessions rights, all invoices and
seluruh tagihan dan pendapatan operasional operating revenues from toll road
dari pengelolaan jalan tol dan usaha-usaha management and other business ventures
lain terkait dengan pengelolaan jalan tol, related to toll road management, escrow
escrow account, tagihan atas pendapatan accounts, claims for income from insurance
- 148 -
Page 146
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dari hasil klaim asuransi, klaim bank garansi, claims, bank guarantee claims and
penggantian dana dari pemerintah, gadai reimbursement of funds from
saham milik pemegang saham, serta the government, the shareholders’ pledge of
Company gurantee dari para pemegang shares, and the Company gurantee of
saham. Perjanjian pinjaman juga mencakup the shareholders. The loan agreement also
persyaratan tertentu antara lain: covers certain requirements such as:
• Membatasi hak Perusahaan untuk • Limiting the Company's right to obtain
memperoleh kredit/ fasilitas baru, new credits/ facilities, changing
mengubah susunan pemegang saham, shareholder struture, making changes to
melakukan perubahan PPJT dan atau the PPJT and or business plan and
business plan, serta mengharuskan requires WTTR to maintain certain
WTTR untuk mempertahankan rasio financial ratios calculated based on
keuangan tertentu yang dihitung WTTR financial statement.
berdasarkan laporan keuangan WTTR.
• Pembatasan penting dalam perjanjian • The major covenant of this financing
pinjaman ini adalah: include the following:
a. Debt to equity ratio (DER) a. Debt to equity ratio (DER) reflecting
mencerminkan rasio pembiayaan the ratio of bank financing and self
bank dan self financing dengan financing with the composition of
komposisi 60:40. Dan Perusahaan 60:40. And the Company must
harus menjaga seluruh posisi DER maintain all DER position not
tidak lebih besar dari 500%, jika greater than 500%, if DER is greater
DER lebih besar dari 500% maka than 500%, the Company must
Perusahaan harus melakukan increase the additional capital paid
penambahan modal atau up or reduce/repay the debt.
pengurangan/ pembayaran hutang.
b. Debt service coverage ratio (DSCR) b. Debt service coverage ratio (DSCR)
lebih dari 1,0 (satu koma nol) kali above 1.0 (one point zero) times
selama masa operasi. during the operation period.
c. Menjaga ekuitas selalu positif. c. Maintain positif balance of equity.
d. Rasio modal disetor terhadap total d. The ratio of paid up capital to
utang di bank minimal sebesar 10%. the total debt in bank is minimum
10%.
Pihak Ketiga Third Parties
a. PBTR a. PBTR
Berdasarkan Akta Notaris No. 37 tanggal Based on Notarial Deed No.37 dated
24 Mei 2017 oleh Ariani Lakhsmijati Rachim, May 24, 2017 by Ariani Lakhsmijati Rachim S.H.,
S.H., Notaris di Jakarta, Perusahaan telah Notary in Jakarta, the Company entered into
menandatangani perjanjian Kredit Sindikasi Loan Syndication with PT Bank Negara
dengan PT Bank Negara Indonesia (Persero) Indonesia (Persero) Tbk, PT Bank Panin
Tbk, PT Bank Panin Indonesia Tbk, Indonesia Tbk, PT Bank ICBC Indonesia,
PT Bank ICBC Indonesia, PT Bank Pembangunan Daerah Sulawesi
PT Bank Pembangunan Daerah Sulawesi Selatan dan Sulawesi Barat, PT Bank Arta Graha
Selatan dan Sulawesi Barat, PT Bank Arta Graha Internasional Tbk, PT Bank Pembangunan
Internasional Tbk, PT Bank Pembangunan Daerah Maluku dan Maluku Utara, PT Bank
Daerah Maluku dan Maluku Utara, PT Bank Pembangunan Daerah Daerah Istimewa
Pembangunan Daerah Daerah Istimewa Yogyakarta, PT Bank Pembangunan Daerah
Yogyakarta, PT Bank Pembangunan Daerah Jambi, PT Bank Nagari, PT Bank Pembangunan
Jambi, PT Bank Nagari, PT Bank Pembangunan Daerah Kalimantan Tengah, PT Bank
Daerah Kalimantan Tengah PT Bank Pembangunan Daerah Bali, PT Bank
Pembangunan Bali, PT Bank Pembangunan Pembangunan Daerah Sumatera Utara, PT Bank
Daerah Sumatera Utara, PT Bank Pembangunan Pembangunan Daerah Jawa Tengah, PT Bank
Daerah Jawa Tengah, PT Bank Negara Negara Indonesia Syariah, PT Bank Jabar
Indonesia Syariah, PT Bank Jabar Banten Banten Syariah dan PT Bank Aceh Syariah.
Syariah dan PT Bank Aceh Syariah. Keenam These sixteen banks are providing a credit facility
belas bank tersebut memberikan fasilitas kredit with a credit ceiling of Rp3,220,000,000,000
maksimum sebesar Rp3.220.000.000.000 yang which consists of investment credit and interest
terdiri dari kredit investasi dan kredit bunga masa during construction amounting to
- 149 -
Page 147
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
konstruksi Rp3.006.150.000.000 masing-masing Rp3,006,150,000,000 and Rp213,850,000,000
dan Rp213.850.000.000. Kedua fasilitas tersebut respectively. Both facilities are provided for the
diberikan untuk keperluan pembangunan Jalan development of Pemalang - Batang Toll Road.
Tol Ruas Pemalang - Batang.
b. WBW b. WBW
Berdasarkan akta perjanjian kredit sindikasi No. Based on the syndicated credit agreement deed
53, tanggal 21 Desember 2018, WBW telah No. 53, dated December 21, 2018, WBW entered
menandatangani perjanjian Kredit Sindikasi into Loan Syndication with
dengan PT Bank Negara Indonesia (Persero) PT Bank Negara Indonesia (Persero) Tbk,
Tbk, PT Bank Rakyat Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk,
PT Sarana Multi Infrastruktur (Persero) PT Sarana Multi Infrastruktur (Persero),
PT Bank Pembangunan Daerah Jawa Timur Tbk, PT Bank Pembangunan Daerah Jawa Timur Tbk,
PT Bank Pembangunan Daerah Riau Kepri, PT PT Bank Pembangunan Daerah Riau Kepri, PT
Bank Pembangunan Daerah Nusa Tenggara Bank Pembangunan Daerah Nusa Tenggara
Timur, PT Bank Pembangunan Daerah Maluku Timur, PT Bank Pembangunan Daerah Maluku
dan Maluku Utara, PT Bank Pembangunan and Maluku Utara, PT Bank Pembangunan
Daerah Kalimantan Selatan, Daerah Kalimantan Selatan,
PT Bank Pembangunan Daerah Sumatera PT Bank Pembangunan Daerah Sumatera
Selatan dan Bangka Belitung, PT Bank Selatan dan Bangka Belitung, PT Bank
Pembangunan Daerah Kalimantan Barat, PT Pembangunan Daerah Kalimantan Barat, PT
Bank Pembangunan Daerah Bengkulu, PT Bank Bank Pembangunan Daerah Bengkulu, PT Bank
Pembangunan Daerah Bali, PT Pembangunan Pembangunan Daerah Bali, PT Pembangunan
Daerah Bank Papua, PT Bank CIMB Niaga Tbk Daerah Bank Papua, PT Bank CIMB Niaga Tbk
Unit usaha Syariah, dan PT Bank Pembangunan Business Unit Syariah, and PT Bank
Daerah Jawa Timur Tbk Unit Usaha Syariah dan Pembangunan Daerah Jawa Timur Tbk Business
Lembaga keuangan non bank lainnya. Unit Syariah and other non banking financial
institution.
Berdasarkan Akta Notaris Perjanjian Kredit Based on the Syndicated Credit Agreement
Sindikasi No. 45 tanggal 21 Desember 2018 oleh Notarial Deed No.45 dated December 21, 2018
Ariani L. Rachim, S.H., Notaris di Jakarta yang by Ariani L.Rachim, S.H., a Notary in Jakarta
dinyatakan kembali berdasarkan akta which was restated based on the deed of
Pernyataan Kembali atas Perjanjian Kredit Restatement of the Syndicated Credit Agreement
Sindikasi No. 30 tanggal 26 Pebruari 2019 oleh No.30 dated February 26, 2019 by Ariani L.
Ariani L. Rachim, S.H., Notaris di Jakarta, CTP Rachim, S.H., a Notary in Jakarta, CTP entered
telah menandatangani Perjanjian Kredit into a Loan Syndicated with PT Bank Rakyat
Sindikasi dengan PT Bank Rakyat Indonesia Indonesia (Persero) Tbk, PT Bank Mandiri
(Persero) Tbk, PT Bank Mandiri (Persero) Tbk, (Persero) Tbk, PT Sarana Multi Infrastruktur
PT Sarana Multi Infrastruktur (Persero) Tbk, (Persero) Tbk, PT Bank CIMB Niaga Tbk, PT
PT Bank CIMB Niaga Tbk, PT Bank Negara Bank Negara Indonesia (Persero) Tbk, PT Bank
Indonesia (Persero) Tbk, PT Bank Pan Indonesia Pan Indonesia Tbk,
Tbk, PT Bank Pembangunan Daerah Jawa Timur PT Bank Pembangunan Daerah Jawa Timur Tbk,
Tbk, dan PT Bank DKI. and PT Bank DKI.
c. WTTR c. WTTR
Berdasarkan Akta No. 3 tanggal 5 Oktober 2018 Based on Deed No. 3 dated October 5, 2018 by
oleh Efran Yuniarto, S.H., M.Kn., Notaris di Efran Yuniarto, S.H., M.Kn., Notary in Jakarta,
Jakarta, WTTR dan PT Sarana Multi Infrastruktur WTTR and PT Sarana Multi Infrastruktur
(Persero) - Unit Usaha Syariah, PT Bank Syariah (Persero) - Unit Usaha Syariah, PT Bank Syariah
Mandiri, PT Bank BPD Jawa Timur - Unit Usaha Mandiri, PT Bank BPD Jawa Timur - Unit Usaha
Syariah, PT Bank Mega Syariah, PT Bank BJB Syariah, PT Bank Mega Syariah, PT Bank BJB
Syariah menandatangani Perjanjian Kredit Syariah entered into Loan Agreement providing
dengan fasilitas kredit maksimum sebesar loan facilities with ceiling of
Rp1.293.201.000.000. Fasilitas tersebut Rp1,293,201,000,000. Loan facilities are
diberikan untuk keperluan pembangunan Jalan provided for development of Pasuruan -
Tol Ruas Pasuruan - Probolinggo. Probolinggo Toll Road.
- 150 -
Page 148
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Entitas Anak - WKR Subsidiary - WKR
Pihak Berelasi Related Parties
PT Bank Tabungan Negara (Persero) Tbk. PT Bank Tabungan Negara (Persero) Tbk.
KMK Bridging Loan KMK Bridging Loan
Pada tanggal 22 Februari 2021, Perusahaan On February 22, 2021, the Company obtained
menandatangani kontrak perjanjian No. 17 dengan contract agreement No.17 with PT Bank Tabungan
PT Bank Tabungan Negara (Persero) Tbk terkait Negara (Persero) Tbk related to loan facility
dengan fasilitas pinjaman sebesar amounting to Rp275,000,000,000. This loan facility is
Rp275.000.000.000. Fasilitas pinjaman ini Bridging Loan Facility for will be used specifically for
merupakah fasilitas Bridging Loan untuk pembayaran debt refinancing. On February 2022, the Company
hutang. Pada Februari 2022, Perusahaan obtained approval for extension of the facility periods
memperoleh persetujuan perpanjangan periode are 36 months with a maturity date till February 22,
fasilitas menjadi 36 bulan dengan jatuh tempo 22 2025.
Februari 2025.
Perjanjian ini telah addendum tanggal 29 Desember This aggrement has amandment on
2022 pada perjanjian kredit No. 114, memperoleh December 29, 2022 based on contract aggrement
persetujuan perpanjangan periode fasilitas menjadi No. 114, the Company obtained approval for
36 bulan dengan jatuh tempo 22 Februari 2025 extension of the facility periods are 36 months with a
dengan tingkat suku bunga 9,50% per tahun. maturity date till February 22, 2025 with interest rate
of 9.50% per annum.
Berdasarkan Akta No. 256 Adendum II tanggal 28 Juli Based on Deed no. 256 Addendum II dated July 28,
2023, Perusahaan telah mendapatkan persetujuan 2023, the Company has received approval for
restrukturisasi dengan fasilitas kredit yang diberikan restructuring with a credit facility provided of
Rp250.000.000.000. Jangka waktu fasilitas Rp250,000,000,000. The facility term has been
diperpanjang 76 bulan dan penurunan suku bunga extended by 76 months and the credit interest rate
kredit menjadi 6% s.d tahun 2026. Terhadap agunan has been reduced to 6% until 2026. The principal
tersebut diberlakukan pengikatan secara Cross collateral is subject to binding by Cross Collateral,
Collateral, Cross RPC dan Cross Default. Cross RPC and Cross Default.
KMK Kemitraan KMK Kemitraan
Pada tanggal 21 Februari 2020, Perusahaan On February 21, 2020, the Company signed contract
menandatangani kontrak perjanjian No. 5 dengan PT agreement No. 5 with PT Bank Tabungan Negara
Bank Tabungan Negara (Persero) Tbk terkait dengan (Persero) Tbk regarding a revolving loan facility of
fasilitas pinjaman sebesar Rp100.000.000.000 Rp100,000,000,000. This loan facility is used for the
bersifat revolving. Fasilitas pinjaman ini digunakan distribution of Partnership Pattern Working Capital
untuk Penyaluran Pemberian Fasilitas Kredit Modal Credit Facilities with a loan facility term of 36 months
Kerja Pola Kemitraan dengan jangka waktu fasilitas after signing the contract agreement with an interest
pinjaman adalah 36 bulan setelah penandatanganan rate of 9.50% per year. The maximum credit facility
kontrak perjanjian dengan tingkat suku bunga 9,50% that can be provided to each Supplier is 60% of the
per tahun. Maksimal fasilitas kredit yang dapat contract value with a maximum total ceiling of
diberikan untuk setiap Supplier sebesar 60% dari nilai Rp10,000,000,000 with a period of 12 months for
kontrak dengan maksimal total plafond each facility withdrawal.
Rp10.000.000.000 dengan jangka waktu 12 bulan
untuk setiap penarikan fasilitas.
KMK Nines KMK Nines
Pada tanggal 14 Agustus 2020, WKR On August 14, 2020, WKR entered contract
menandatangani kontrak perjanjian No. 1 dengan agreement No. 1 with PT Bank Tabungan Negara
PT Bank Tabungan Negara (Persero) Tbk terkait (Persero) Tbk related to loan facility amounting to
dengan fasilitas pinjaman sebesar Rp400,000,000,000. This loan facility will be used
Rp400.000.000.000. Fasilitas pinjaman ini hanya specifically for the construction of unit of apartment in
dapat digunakan untuk pembiayaan konstruksi Vasaka Nines Project, in BSD-Banten. with term of 60
pembangunan unit apartemen di proyek Vasaka months after signing contract with interest rate of
Nines, di BSD-Banten dengan jangka waktu fasilitas 9.90% per annum. The credit facilities are secured by
pinjaman adalah 60 bulan setelah penandatanganan land square of 8.922 m2 located on project
kontrak perjanjian dengan tingkat suku bunga 9,90%
- 151 -
Page 149
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
per tahun. Pinjaman tersebut dijamin dengan tanah development of Vasaka Nines BSD and cessie of unit
seluas 8.922 m2 di lokasi proyek pembangunan apartment from customers.
Vasaka Nines BSD dan agunan pokok kredit unit
apartemen dengan asuransi kerugian.
Berdasarkan Akta No. 259 Adendum I tanggal 28 Juli Based on Deed no. 259 Addendum I dated July 28,
2023, Perusahaan telah mendapatkan persetujuan 2023, the Company has received approval for
restrukturisasi dengan fasilitas kredit yang diberikan restructuring with a credit facility provided of
Rp344.846.000.000. Jangka waktu fasilitas Rp344,846,000,000. The facility term has been
diperpanjang 58 bulan dan penurunan suku bunga extended by 58 months and the credit interest rate
kredit menjadi 6% sampai dengan tahun 2026. has been reduced to 6% until 2026. There is
Terdapat agunan tambahan atas pinjaman tersebut additional collateral for the loan in the form of Land
berupa Tanah Vasaka Soltera SHGB No. Vasaka Soltera SHGB No. 00821/West Pejaten with
00821/Pejaten Barat dengan luas 495 m2. Terhadap an area of 495 m2. The principal collateral is subject
agunan tersebut diberlakukan pengikatan secara to binding by Cross Collateral, Cross RPC and Cross
Cross Collateral, Cross RPC dan Cross Default. Default.
KMK 88 Avenue KMK 88 Avenue
Pada tanggal 29 Mei 2017, WKR menandatangani On May 29, 2017, WKR entered contract agreement
kontrak perjanjian No. 53 dengan PT Bank Tabungan No. 53 with PT Bank Tabungan Negara (Persero) Tbk
Negara (Persero) Tbk terkait dengan fasilitas related to loan facility amounting to
pinjaman sebesar Rp300.000.000.000. Fasilitas Rp300,000,000,000. This loan facility will be used
pinjaman ini hanya dapat digunakan untuk specifically for the construction of hardcost
pembiayaan konstruksi hardcost pembangunan development of SOHO and Apartment 88 Avenue,
SOHO dan Apartemen 88 Avenue, proyek KSO owned by KSO Waskita - Darmo, in Surabaya with
Waskita - Darmo, di Surabaya dengan jangka waktu term of 60 months after signing contract with interest
fasilitas pinjaman adalah 60 bulan setelah rate of 9.75% per annum. The credit facilities are by
penandatanganan kontrak perjanjian dengan tingkat land and building owned by KSO Waskita - Darmo.
suku bunga 9,75% per tahun. Pinjaman tersebut
dijamin dengan tanah dan bangunan yang ada
diatasnya milik KSO Waskita - Darmo.
Perjanjian ini telah addendum tanggal 27 April 2022 This aggrement has amandment on April 27 2022
pada perjanjian kredit No.15, WKR memperpanjang based on contract aggrement No.15, WKR extended
fasilitas dengan jangka waktu 24 bulan dengan the facility with obtained approval for extension of
fasilitas pinjaman sebesar Rp190.000.000.000. the facility periods are 24 months with oustanding
plafond amounting Rp190,0000,000,000
Berdasarkan Akta No. 257 Adendum III tanggal 28 Based on Deed no. 257 Addendum III dated July 28,
Juli 2023, Perusahaan telah mendapatkan 2023, the Company has received approval for
persetujuan restrukturisasi dengan fasilitas kredit restructuring with a credit facility provided of
yang diberikan Rp178.000.000.000. Jangka waktu Rp178,000,000,000. The facility term has been
fasilitas diperpanjang 55 bulan dan penurunan suku extended by 55 months and the credit interest rate
bunga kredit menjadi 6% sampai dengan tahun 2026. has been reduced to 6% until 2026. The principal
Terhadap agunan pokok tersebut diberlakukan collateral is subject to binding by Cross Collateral and
pengikatan secara Cross Collateral dan Cross RPC. Cross RPC.
KMK Reiz Condo KMK Reiz Condo
Pada tanggal 18 Desember 2017, WKR On December 18, 2017, WKR entered contract
menandatangani kontrak per janjian No. 28 dengan agreement No. 28 with PT Bank Tabungan Negara
PT Bank Tabungan Negara (Persero) Tbk terkait (Persero) Tbk related to loan facility amounting to
dengan fasilitas pinjaman sebesar Rp340,000,000,000. This loan facility will be used
Rp340.000.000.000. Fasilitas pinjaman ini hanya specifically for the construction of 610 units of
dapat digunakan untuk pembiayaan konstruksi apartment in The Reiz Condo Project owned
pembangunan 610 unit apartemen di proyek The PT Waskita Karya Realty, in Medan.
Reiz Condo PT Waskita Karya Realty, di Medan.
Saldo pokok terutang dari fasilitas ini sebesar The outstanding principal balance amounting to
Rp340.000.000.000 dengan jangka waktu penarikan Rp340,000,000,000 with term of withdrawal 60
fasilitas pinjaman adalah 60 bulan setelah months after signing contract with interest rate of 9.25
penandatanganan kontrak perjanjian dengan tingkat % per annum. The credit facilities are secured by land
suku bunga 9,25 % per tahun. Pinjaman tersebut square of 7,856 m2 located on project development
- 152 -
Page 150
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dijamin dengan tanah seluas 7.856 m2 di lokasi of The Reiz Condo Medan and cessie of unit
proyek pembangunan The Reiz Condo Medan dan apartment from customers.
agunan pokok kredit unit apartemen dengan asuransi
kerugian.
Perjanjian ini telah addendum tanggal This aggrement has amandment on
29 Desember 2022 pada perjanjian kredit No. 114, December 29, 2022 based on contract aggrement
Perusahaan memperpanjang fasilitas dengan jangka No. 114, The Company extended the facility with
waktu. obtained approval for extension of the facility periods.
Berdasarkan Akta No. 258 Adendum III tanggal 28 Based on Deed no. 258 Addendum III dated July 28,
Juli 2023, Perusahaan telah mendapatkan 2023, the Company has received approval for
persetujuan restrukturisasi dengan fasilitas kredit restructuring with a credit facility provided of
yang diberikan Rp110.300.000.000. Jangka waktu Rp110,300,000,000. The facility term has been
fasilitas diperpanjang 45 bulan dan penurunan suku extended by 45 months and the credit interest rate
bunga kredit menjadi 6% s.d tahun 2026. Terhadap has been reduced to 6% until 2026. The principal
agunan pokok tersebut diberlakukan pengikatan collateral is subject to binding by Cross Collateral and
secara Cross Collateral dan Cross RPC. Cross RPC.
WFPR WFPR
Pada tanggal 15 Januari 2020, WFPR On January 15, 2020, WFPR entered contract
menandatangani kontrak perjanjian No. 41 dengan agreement No. 41 with PT Bank Tabungan Negara
PT Bank Tabungan Negara (Persero) Tbk terkait (Persero) Tbk related to loan facility amounting to
dengan fasilitas pinjaman sebesar Rp258,000,000,000. This loan facility will be used
Rp258.000.000.000. Fasilitas pinjaman ini hanya specifically for the construction of unit of apartment in
dapat digunakan untuk pembiayaan konstruksi Vasaka Solterra Project owned PT Waskita Fim
pembangunan unit apartemen di proyek Vasaka Perkasa Realti, in Pejaten Jakarta with term of 60
Solterra PT Waskita Fim Perkasa Realti, di Pejaten months after signing contract with interest rate of
Jakarta dengan jangka waktu fasilitas pinjaman 9.50% per annum.
adalah 60 bulan setelah penandatanganan kontrak
perjanjian dengan tingkat suku bunga 9,50% per
tahun.
Pada tanggal 21 Oktober 2020, Perusahaan On October 21, 2020, the Company signed an
menandatangani kontrak perjanjian No. 63 dengan agreement contract No. 63 with PT Bank Tabungan
PT Bank Tabungan Negara (Persero) Tbk terkait Negara (Persero) Tbk related to the addition of the
dengan penambahan plafond fasilitas pinjaman loan facility ceiling of Rp58,000,000,000. The total
sebesar Rp58.000.000.000. Sehingga total kredit principal debt amounted to Rp258,000,000,000. This
sebesar Rp258.000.000.000. Fasilitas pinjaman ini loan facility is used to finance the construction of
digunakan untuk pembiayaan pembangunan apartments and commercial areas of Tower Mid
apartemen dan commercial area Tower Mid (Tower (Tower Vasaka Residence) in Jakarta Selatan. With
Vasaka Residence) di Jakarta Selatan. Dengan the term of withdrawal of the loan facility is 60 months
jangka waktu penarikan fasilitas pinjaman adalah 60 after the signing of the contract of the agreement and
bulan setelah penandatanganan kontrak perjanjian in the final addendum to agreement contract No. 60
dan di addendum terakhir pada kontrak perjanjian No. dated May 11, 2023, the loan period was extended by
60 tanggal 11 Mei 2023, jangka waktu pinjaman 24 months. Interest rate of 9.5% per annum.
diperpanjang 24 bulan. Tingkat suku bunga 9,5% per
tahun.
Pinjaman tersebut dijamin dengan tanah seluas The credit facilities are secured by land square of
11.233 m2 di lokasi proyek pembangunan Vasaka 11,233 m2 located on project development of Vasaka
Solterra Pejaten dan agunan pokok kredit unit Solterra Pejaten and cessie of unit apartment from
apartemen dengan asuransi kerugian. customers.
Fasilitas ini mensyaratkan Perusahaan untuk These facilities require the Company to maintain
memelihara rasio keuangan tertentu: financial ratio:
a. Current ratio > 1x a. Current ratio > 1x
b. Debt to equity ratio <5x b. Debt to equity ratio < 5x
c. Rasio modal disetor terhadap total utang di bank c. Ratio from paid fully paid capital to total bank
min 10% loan min 10%
d. EBITDA bernilai positif d. EBITDA has positive
- 153 -
Page 151
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pihak Ketiga Third Parties
Pinjaman Bank - Modal Kerja
Tanggal Tingkat bunga per
Jenis fasilitas/ Fasilitas perjanjian/ Tanggal jatuh tahun/ 31 Maret/ 31 Desember/
Kreditur/ Entitas/ Type of maksimum/ Agreement tempo/ Interest rate per March 31, December 31,
Creditors Entities facilities Maximum facility date Maturity date annum 2024 2023
PT Bank Jtrust WKR/ WKR Modal Kerja/ 65.000.000.000 25 September/ 2 Agustus/ 10,00% 60.840.725.789 60.937.500.000
Indonesia Tbk Working Capital September 25, August 2, 2023
2023
PT Bank Jtrust Indonesia Tbk PT Bank Jtrust Indonesia Tbk
Pada tanggal 30 November 2021, Grup On November 30, 2021, the Company entered
menandatangani kontrak perjanjian No. 131 dengan contract agreement No. 131 with PT Bank Jtrust
PT Bank Jtrust Indonesia Tbk terkait dengan fasilitas Indonesia Tbk related to loan facility amounting to
pinjaman sebesar Rp65.000.000.000. Fasilitas Rp65,000,000,000. This loan facility will be used
pinjaman ini hanya dapat digunakan untuk modal specifically for working capital owned WKR, in
kerja WKR di Vasaka Residential Bali, Denpasar. Vasaka Residential Bali, Denpasar.
Saldo pokok terutang dari fasilitas ini sebesar The outstanding principal balance amounting to
Rp65.000.000.000 dengan jangka waktu fasilitas Rp65,000,000,000 with term of 60 months after
pinjaman adalah 60 bulan setelah penandatanganan signing contract with interest rate of 10,55% per
kontrak perjanjian dengan tingkat suku bunga annum.
10,55% per tahun.
Pinjaman tersebut dijamin dengan tanah seluas The credit facilities are secured by land square of
11.657 m2 di lokasi proyek pembangunan Vasaka 11,657 m2 located on project development of Vasaka
Residential Bali dan agunan fidusia berupa piutang Residential Bali and cessie of receivables from
usaha. customers.
Fasilitas ini mensyaratkan Perusahaan untuk These facilities require the Company to maintain
memelihara rasio keuangan tertentu: financial ratio.
a. Current ratio > 1x a. Current ratio at > 1x
b. Debt to equity ratio < 5x b. Debt to equity ratio < 5x
c. Rasio modal disetor terhadap total utang di c. Ratio from fully paid capital to total bank loan
bank min 10% min 10%
d. EBITDA bernilai positif d. EBITDA has positive
Berdasarkan Akta Notaris No. 23 tanggal 25 September Based on Notarial Deed No. 23 dated 25 September
2023 oleh Dewi Tenti Septi Artianti, S.H., M.H., M.Kn., 2023 by Dewi Tenti Septi Artianti, S.H., M.H., M.Kn.,
Notaris di Jakarta perihal perubahan perjanjian kredit Notary in Jakarta regarding changes to the term
fasilitas kredit angsuran berjangka, WKR melakukan installment credit facility credit agreement, WKR
restrukturisasi kredit dengan Bank Jtrust dengan carried out credit restructuring with Jtrust Bank with
beberapa perubahan diantaranya, Sisa Pokok several changes including, the remaining principal
(outstanding) pinjaman per tanggal 23 Agustus 2023 (outstanding) of the loan as of 23 August 2023, the
menjadi pagu baru dalam fasilitas restrukturisasi new ceiling in the restructuring facility is worth
dengan nilai Rp60.937.500.000; perubahan jangka Rp60,937,500,000; change in facility term from
waktu fasilitas menjadi sejak tanggal efektif effective date of restructuring until 2 August 2027;
restrukturisasi sampai dengan 2 Agustus 2027; dan and changes in interest rates to 10% per year.
perubahan tingkat suku bunga menjadi 10% per tahun.
Entitas Anak - WBP Subsidiary - WBP
Pihak Berelasi Related Parties
Berdasarkan Perjanjian Perdamaian dalam PKPU Based on the Reconciliation Agreement in PKPU this
fasilitas pinjaman ini direstrukturisasi menjadi Utang loan facility was restructured into Long-Term Bank
Bank Jangka Panjang sebagai berikut: Loans as follows:
Pinjaman Bank - Kredit Modal Kerja
Tanggal Tingkat bunga per
Jenis fasilitas/ Fasilitas perjanjian/ Tanggal jatuh tahun/ 31 Maret/ 31 Desember/
Kreditur/ Entitas/ Type of maksimum/ Agreement tempo/ Interest rate per March 31, December 31,
Creditors Entities facilities Maximum facility date Maturity date annum 2024 2023
PT Bank Rakyat WBP/ WBP Kredit Modal 863.227.418.096 20 Agustus/ Jatuh tempo 2,00% 861.798.917.980 863.227.418.096
Indonesia (Persero) Tbk Kerja/ Working August 20, 2021 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
- 154 -
Page 152
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
PT Bank Syariah WBP/ WBP Kredit Modal 698.440.760.706 17 Oktober/ Jatuh tempo 2,00% 697.299.507.085 698.440.760.706
Indonesia Kerja/ Working October 17, 2016 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
PT Bank Negara WBP/ WBP Kredit Modal 564.949.532.620 23 Juni 2022/ Jatuh tempo 8,00% 535.380.691.483 536.267.943.238
Indonesia (Persero) Tbk Kerja/ Working June 23, 2022 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
PT Bank Mandiri WBP/ WBP Kredit Modal 270.691.905.539 6 Maret/ March Jatuh tempo 10,50% 304.818.328.075 305.298.506.454
(Persero) Tbk Kerja/ Working 6, 2023 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
1. PT Bank Rakyat Indonesia (Persero) Tbk. 1. PT Bank Rakyat Indonesia (Persero) Tbk.
Berdasarkan Surat dari Bank BRI No. R.IV.45- Based on the Letter from Bank BRI No.
CRO/BCO/08/2021 tanggal 20 Agustus 2021 R.IV.45-CRO/BCO/08/2021 dated August 20,
mengenai penawaran putusan kredit, telah 2021 regarding credit decision offer, the
disetujui fasilitas Modal Kerja Konstruksi (KMKK) Construction Working Capital Facility has been
dengan plafond sebesar Rp1.000.000.000.000 approved with a ceiling of
dan fasilitas SCF sebesar Rp250.000.000.000 Rp1,000,000,000,000 with KMKK facitlity and
bersifat interchangeable dengan fasilitas KMKK, the SCF facility of Rp250,000,000,000 is
dengan suku bunga 9,00% p.a. dan jangka waktu interchangeable with the KMKK facility, with an
30 Agustus 2021 sampai dengan 30 November interest rate of 9% p.a. and the period from
2021. August 30, 2021 to November 30, 2021.
Fasilitas pinjaman ini dijamin dengan piutang This loan facility is secured by trade receivables
usaha yang diikatkan secara cessie minimal tied in cessie at least to cover 120% of
meng-cover sebesar 120% dari outstanding outstanding loans and collateral according to
pinjaman dan agunan sesuai SHT 209/2017 di SHT 209/2017 in Gasing Village, Talang Kelapa
Desa Gasing Kecamatan Talang Kelapa, District, Banyuasin Regency, South Sumatra
Kabupaten Banyuasin, Provinsi Sumatera Province amounting to Rp41,651,000,000. As
Selatan senilai Rp41.651.000.000. Sebagai additional information, WBP has received a
tambahan informasi, WBP telah menerima surat Letter of Review on the Bonding of Loan Facility
Review Pengikatan Agunan Fasilitas Pinjaman Collateral from Bank BRI number: B.13a-
dari Bank BRI nomor: B.13a-ITG/CON/01/2022 ITG/CON/01/2022 dated January 12, 2022 in
tanggal 12 Januari 2022 sehubungan dengan connection with the binding of collateral for the
pengikatan jaminan aset Perusahaan. Company's assets.
Adapun perubahan atas negative covenants The changes to the negative covenants that are
yang diatur adalah tanpa terlebih dahulu regulated are that without first obtaining written
memperoleh persetujuan tertulis dari BRI, debitur approval from BRI, debtors are not allowed,
tidak diperkenankan antara lain tetapi tidak among others, but not limited to receiving new
terbatas pada menerima pinjaman/ pembiayaan loans/financing from Banks or Other Financial
baru dari Bank atau Lembaga Keuangan Lainnya Institutions which causes the Company's DER
yang menyebabkan rasio DER Perusahaan ratio to exceed 300%.
melebihi 300%.
Pembatasan terhadap tindakan: Restriction of covenant:
1. Mengikatkan diri sebagai penjamin terhadap 1. Binds itself as a collateral against
pihak lain dan/atau menjaminkan kekayaan the other party and/or pledging Debtor
debitur kepada pihak lain, kecuali yang wealth to other parties, except those already
sudah ada saat ini. existing.
2. Mengajukan permohonan pernyataan pailit 2. Filing for bankruptcy declaration to
kepada Pengadilan Niaga untuk the Commercial Court to declare itself
menyatakan pailit debitur sendiri. insolvent debtor
3. Menyewakan aset yang dijaminkan di bank 3. Lease the tangible assets in banks or other
atau lembaga keuangan lainnya. financial institutions.
4. Melunasi/membayar utang kepada 4. Repay the debt to shareholders/limited
pemegang saham/utang persero sebelum Company's debt before the bank repays
utang di bank dilunasi terlebih dahulu. the debt in advance.
5. Melakukan tindakan merger, akuisisi, go 5. Perform mergers, acquisitions, go public and
public dan penjualan aset Perusahaan. sell the Company’s assets;
- 155 -
Page 153
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Menerima pinjaman/pembayaran baru dari
BRI atau lembaga keuangan lainnya.
Pinjaman BRI akan jatuh tempo pada tahun ke BRI loans will be due on the 17th year from
17 sejak Tanggal Efektif. Effective Date
2. PT Bank Syariah Indonesia (d/h 2. PT Bank Syariah Indonesia (formerly PT
PT Bank Mandiri Syariah, PT Bank BNI Bank Mandiri Syariah, PT Bank BNI Syariah
Syariah dan PT Bank BRI Syariah) and PT Bank BRI Syariah)
Berdasarkan perjanjian pemberian line facility Based Musyarakah facility agreement No.
Musyarakah No. 13 tanggal 17 Oktober 2016 dan 13 dated October 17, 2016, and this facility has
fasilitas ini telah diperpanjang berdasarkan surat recently been extended based on the letter No.
No. B.04/SP3/FSD/01-2021 tanggal 27 Januari B.04/SP3/FSD/01-2021 dated January 27, 2021,
2021, dengan kondisi dan persyaratan sebagai with the following conditions Line Facility
berikut Line Facility Musyarakah dengan plafon Musyarakah with ceiling of
Rp470.000.000.000, jatuh tempo fasilitas sampai Rp470,000,000,000, facility maturity date up to
dengan 27 Februari 2022, nisbah bagi hasil akan February 27, 2022, the profit sharing ratio will be
ditentukan kemudian saat pencairan dengan determined later when disbursing with an
indikasi expense yield Bank saat ini sebesar 8% indication that the current bank yield is 8%
efektif per tahun. Sampai dengan tanggal effective per year. As of the date of reporting, this
pelaporan, pinjaman ini masih dalam proses loan is still in the process of being extended.
perpanjangan.
Selama masa pembiayaan di PT Bank Syariah During the financing period at PT Bank Syariah
Indonesia Tbk (BSI) berlangsung maka WBP Indonesia Tbk (BSI), WBP are not permitted to
tidak diperkenankan melakukan tindakan- carry out the following actions without written
tindakan di bawah ini tanpa persetujuan tertulis consent from BSI:
dari BSI:
a. Mengadakan merger dengan Perusahaan a. Hold a merger with another Company;
lain;
b. Membayar/melunasi sebagian atau seluruh b. Pay/pay off part or all of the loan from
pinjaman dari pemegang saham; the shareholders;
c. Mengubah bentuk atau status badan hukum c. Change the form or status of the legal entity
Perseroan, merubah anggaran dasar of the Company, amending
Perusahaan, memindahtangankan the Company's articles of association,
penerima atau saham baik antar pemegang transferring recipients or shares both among
saham maupun pihak lain; shareholders and other parties;
d. Mengagunkan, menyewakan dan d. Appoint, lease and transfer assets
mengalihkan aset yang dijaminkan kepada guaranteed to creditors or other parties;
kreditur atau pihak lainnya;
e. Melakukan investasi baru pada bidang e. Make new investments in business fields
usaha yang tidak secara langsung berkaitan that are not directly related to the customer's
dengan bisnis inti nasabah; core business;
f. Menjual sebagian atau seluruh aset f. Sells part or all of the Company's assets,
Perusahaan, di luar kegiatan operasional excluding the Company's operational
Perusahaan; activities.
g. Mengajukan pailit atau penundaan g. File a bankruptcy or delay in payment;
pembayaran;
h. Menarik kembali modal yang telah disetor h. Withdrawing capital paid by shareholders;
oleh para pemegang saham;
i. Merubah pemegang saham mayoritas i. Change the majority shareholder of
Perseroan. the Company.
Fasilitas dijaminkan dengan: This loan facility are secured with:
1. Jumlah tagihan (seluruh hak, wewenang, 1. The amount of the bill (all rights, powers, bills
tagihan serta klaim-klaim) yang dimiliki and claims) that the Company has to
Perusahaan kepada bouwheer atas kontrak- the bouwheer for the work contracts
kontrak pekerjaan yang menjadi underlying underlying the disbursement in BSI.
pencairan di BSI.
2. Persediaan berupa barang jadi (Beton 2. Inventories in the form of finished goods
Precast) dan/ atau bahan material berupa (Precast Concrete) and/ or material
pasir, batu, semen, besi/baja, dan lain-lain.
- 156 -
Page 154
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
materials in the form of sand, stone, cement,
iron/steel, and others.
Nilai fidusia atas jaminan berupa tagihan dan Fiduciary value with collateralized bill and
persediaan adalah senilai Rp750.000.000.000. inventory are amounting to
Rp750,000,000,000.
WBP diwajibkan untuk menjaga Debt service WBP should maintain Debt service coverage
coverage ratio (EBITDA dibandingkan total ratio (EBITDA compared to the Bank's total
kewajiban Bank) minimal 1,1 kali dan Leverage liabilities) at least 1.1 times and maximum
maksimal 5 kali. leverage of 5 times.
Berdasarkan Surat dari BSI nomor 03/026- Based on the Letter from BSI number 03/026
3/CMG tanggal 24 Maret 2023 perihal Surat 3/CMG dated March 24, 2023 regarding
penyampaian tagihan kewajiban PT Waskita the Letter of submission of PT Waskita Beton
Beton Precast Tbk (WBP) ke PT Bank Syariah Precast Tbk (WBP) liability bills to PT Bank
Indonesia Tbk (BSI) atas fasilitas supplier Syariah Indonesia Tbk (BSI) for supplier financing
financing yang masuk dalam kategori kreditur facilities that fall into the category of congruent
kongkuren sesuai Putusan Homologasi creditors according to the Decision Homologation
No. 497/Pdt.SusPKPU/2021/PN.Niaga. Jkt.Pst, No. 497/Pdt.SusPKPU/2021/PN.Niaga. Jkt.Pst,
dengan ini disampaikan hal-hal berikut: we hereby submit the following:
1. Total tagihan kepada BSI sebagai Kreditur 1. Total claims to BSI as Concurrent Creditors
Konkuren (Fasilitas SCF) adalah sebesar (SCF Facility) Rp187,665,894,478.
Rp187.665.894.478.
2. Tunggakan Kewajiban sebelum Putusan 2. Arrears of Liability prior to Homologation
Homologasi sebesar Rp9.984.667.552. Decision of Rp9,984,667,552.
3. Pembayaran kewajiban PT Waskita Beton 3. Payment of obligations of PT Waskita Beton
Precast Tbk ke PT Bank Syariah Indonesia Precast Tbk to PT Bank Syariah Indonesia
atas fasilitas Supplier Financing kami for the Supplier Financing facility of
tagihkan sebesar Rp284.119.681.211 Rp284,119,681,211 (according to
(sesuai skedul yang tertera pada surat). the schedule stated in the letter).
4. Atas pembayaran tagihan ujrah pada bulan 4. For payment of ujrah bills in March 2023 in
Maret 2023 sebesar Rp1.913.420.518 agar the amount of Rp1,913,420,518 to be
dicadangkan oleh PT Waskita Beton Precast reserved by PT Waskita Beton Precast to
ke rekening escrow BSI 7231185636 a.n. PT the BSI escrow account 7231185636 a.n.
Waskita Beton Precast. PT Waskita Beton Precast.
5. Pendebetan atas ujrah tersebut akan 5. The debit for the ujrah will be carried out
dilakukan setelah proses novasi atas afterthe novation process for the SCF facility
fasilitas SCF di BSI terselesaikan. at BSI iscompleted.
Pinjaman BSI akan jatuh tempo pada tahun ke BSI loans will be due on the 17th year from
17 sejak Tanggal Efektif. Effective Date.
3. PT Bank Negara Indonesia (Persero) Tbk 3. PT Bank Negara Indonesia (Persero) Tbk
Berdasarkan surat No. KPS3/4.1/140/R tanggal According to letter No. KPS3/4.1/058/R dated
23 Juni 2022, Perusahaan memperoleh fasilitas June 23, 2022, WBP entered into the
kredit dari PT Bank Negara Indonesia (Persero) credit facilities from PT Bank Negara Indonesia
Tbk sebagai berikut: (Persero) Tbk as follows:
• Kredit modal kerja Revolving • Revolving working capital loan of
Rp50.000.000.000, jangka waktu pinjaman Rp50,000,000,000, the term of the
diperpanjang sementara sampai dengan loan is temporarily extended until September
tanggal 26 September 2022 dengan 26, 2022 with change in the effective interest
perubahan suku bunga efektif sebesar rate to 8.00% p.a.
8,00% p.a.
• Kredit modal transaksional • Transactional capital loan of
Rp300.000.000.000, jangka waktu pinjaman Rp300,000,000,000, the term of the loan is
diperpanjang sementara sampai dengan temporarily extended until September 26,
tanggal 26 September 2022 dengan 2022 with change in the effective interest
perubahan suku bunga efektif sebesar rate to 8.00% p.a.
8,00% p.a..
• Kredit modal kerja post financing • Post-financing working capital loan
sebesar Rp214.949.532.620, jangka waktu amounting to Rp214,949.532,620, the term
- 157 -
Page 155
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
pinjaman diperpanjang sementara sampai of the loan is temporarily extended until
dengan tanggal 31 Desember 2023 dengan December 31, 2023 with a change in
perubahan suku bunga efektif sebesar the effective interest rate to 8.00% p.a.
8,00% p.a.
Fasilitas dijaminkan dengan: This loan facility are secured with:
• Tagihan term-in atas proyek yang dibiayai • Term-in bills on financed projects
• Tanah dan Bangunan yang terletak di • Land and Buildings located on Jl. Raya
Jl. Raya Sadang - Subang No.28 KM 15, Sadang - Subang No.28 KM 15, Mekarsari
Kampung Mekarsari, RT 05 RW 02, Desa Village, RT 05 RW 02, Cibatu Village, Cibatu
Cibatu, Kecamatan Cibatu, Kabupaten District, Purwakarta Regency, West Java
Purwakarta, Jawa Barat sesuai SHT according to SHT No.2342/2015 and SHT
No.2342/2015 dan SHT No.02440/2021 No.02440/2021 amounting to
sebesar Rp168.487.004.000. Rp168,487,004,000.
• Tanah dan Bangunan yang terletak di Jl. • Land and Buildings located at Jl. Imam
Imam Bonjol No. 52, Desa Kalijaya, Kec. Bonjol No. 52, Kalijaya Village, West
Cikarang Barat, (dhi. Cibitung), Kab. Bekasi, Cikarang District, (formerly Cibitung), Bekasi
Jawa Barat sesuai SHT. 03410/2016 Regency, West Java according to SHT.
sebesar Rp58.218.498.201. 03410/2016 of Rp58,218,498,201.
Sebagai tambahan informasi, WBP telah As additional information, WBP has received a
menerima Surat Keputusan Kredit (SKK) letter from BNI No. KPS3/2.2/204 dated
No. KPS3/2.2/204 tanggal 19 Mei 2021 May 19, 2021 regarding the binding of
sehubungan dengan pengikatan jaminan aset the Company's asset collateral.
Perusahaan.
Pembatasan terhadap tindakan: Restriction of covenant:
1. Melakukan perubahan kegiatan usaha 1. Change the business activities as stated in
sebagaimana tercantum dalam anggaran the Articles of Association that can reduce
dasar yang dapat mengurangi kemampuan the Company’s ability to pay off the credit
melunasi fasilitas kredit. facility.
2. Menjual atau memindahkan hak atau 2. Sell or transfer all of the assets of
mengalihkan seluruh atau sebagian the Company in a single transaction or in
kekayaan/ aset dalam satu transaksi atau multiple transactions, except:
dalam beberapa transaksi kecuali:
• Menjual atau mengalihkan aset dengan • Selling or transferring assets under
ketentuan yang bersifat arm’s length arragement that are at arm’s length and
dan dalam rangka menjalankan usaha in order to run the daily business
sehari- hari. activities
• Menjual atau dengan cara lain • Selling or transferring assets as a
mengalihkan aset sebagai ganti atau replacement or to be replaced with
digantikan aset lainnya yang sebanding another comparable assets or better in
atau lebih baik tipe, sifat dan type, nature, and quality
kualitasnya.
• Menjual atau mengalihkan aset dalam • Selling or transferring assets for
rangka pelaksanaan reorgarnisasi oleh the purpose of Government
Pemerintah Republik Indonesia reorganization of Republic of Indonesia
sepanjang penjualan aset tersebut tidak as long as the sale of assets did not
mempunyai akibat material dan have a material result; and.
• Menjual atau mengalihkan aset yang • Selling or transferring assets that are not
sudah tidak berguna atau tidak dipakai useful or not used with the requirements
lagi dengan ketentuan yang bersifat of arm’s length
arm’s length.
3. Mengubah usaha yang sekarang dijalankan/ 3. Change the operation of current business
diusahakan yang dapat menimbulkan akibat that may cause material impact unless
material, kecuali dipersyaratkan oleh required by applicable law.
perundang- undangan yang berlaku.
4. Melakukan peleburan, penggabungan, 4. Merger, business combination, separation,
pemisahan, pembubaran Perseroan liquidation or corporate reorganization
(corporate action), except:
- 158 -
Page 156
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
maupun rekonstruksi (tindakan korporasi),
kecuali:
• Reorganisasi yang dapat dilakukan oleh • Reorganization can be done by
Pemerintah Republik Indonesia the Government of Republic Indonesia
sepanjang tidak memiliki akibat material. as long as the impact is not material
• Tindakan korporasi dengan anggota lain • The corporate actions with other
dalam grup dengan ketentuan bahwa members in The Company with
tindakan korporasi tersebut dilakukan. the provision following the requirements
• Tindakan korporasi yang dipersyaratkan • The Company will be the resurviving
oleh peraturan perundang-undangan legal entity and will have the legal status
yang berlaku. after the corporate action; and.
• Pemisahan dimana Perusahaan • Separation in which the Company will be
menjadi pemegang saham mayoritas. the majority shareholder.
5. Melakukan perubahan anggaran dasar yang 5. Changes in the Articles of Association that
dapat menimbulkan akibat material. can lead to a material impact; and.
6. Mengajukan permohonan pailit atau 6. Propose to file bankruptcy or postponement
permohonan penundaan kewajiban of debt payment to authorized parties
pembayaran utang kepada instansi yang
berwenang.
7. Memperoleh pinjaman dari bank atau 7. Obtain or add a loan from a bank or other
lembaga keuangan lain. financial institution.
Pinjaman BNI akan jatuh tempo pada tahun ke BNI loans will be due on the 17th year from
17 sejak Tanggal Efektif. Effective Date.
4. PT Bank Mandiri (Persero) Tbk 4. PT Bank Mandiri (Persero) Tbk
Berdasarkan Surat dari PT Bank Mandiri Based on a Letter from PT Bank Mandiri
(Persero) Tbk No 4.Ar.JPK/SME/SPPK/0076/ (Persero) Tbk No. 4.Ar.JPK/SME/SPPK/0076
2023 tanggal 6 Maret 2023 perihal Surat /2023 dated 6 March 2023 regarding the Letter of
Penawaran Pemberian Kredit, telah ditentukan Offer for Credit, it has been determined as
sebagai berikut: follows:
1. Tujuan Penggunaan 1. Purpose of Use
Pengalihan hak tagih dalam rangka Transfer of billing rights in the context of
pelaksanaan Perjanjian Perdamaian implementing the PT Waskita Beton Precast
PT Waskita Beton Precast Tbk (WBP) dari Tbk (WBP) Settlement Agreement from 26
26 Supplier/ Sub Kontraktor kepada PT Bank Suppliers/ Sub-Contractors to PT Bank
Mandiri atas invoice yang telah dibiayai Mandiri for invoices that have been financed
dengan fasilitas Accepted Invoice Financing. with the Accepted Invoice Financing facility.
2. Fitur dan Ketentuan 2. Features and Conditions
Fitur dan ketentuan fasilitas kredit WBP Features and conditions of the WBP credit
sesuai dengan Skema Tranche A: facility in accordance with the Tranche A
Scheme:
• Jenis fasilitas KMK Post Financing • Type of facility KMK Post Financing
• Jangka waktu 20 September 2022 • The period is 20 September 2022 to 20
sampai dengan 20 September 2039 September 2039 (17 years from
(17 tahun sejak tanggal berlaku the effective date of the WBP
perjanjian WBP). agreement).
• Nilai pokok sebesar • The principal value is
Rp270.691.905.539. Rp270,691,905,539.
• Bunga sebelum Efektif Perjanjian • Interest before the Effectiveness of the
Perdamaian WBP: WBP Settlement Agreement:
- Bunga sampai dengan jatuh tempo - Interest until the due date of
invoice yang dilaporkan kepada the invoice is reported to the PKPU
pengurus PKPU (10.5% p.a) management (10.5% p.a) with an
dengan biaya bunga sebesar interest fee of IDR 21,316,590,997.
Rp21.316.590.997.
- 159 -
Page 157
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
- Bunga setelah homologasi sampai - Interest after homologation until 19
dengan 19 September 2022 10.5% September 2022 10.5% p.a) with
p.a) dengan biaya bunga sebesar interest costs of Rp13,290,009,918.
Rp13.290.009.918.
- Jumlah bunga sebesar - The amount of interest is
Rp34.606.600.915. Rp34,606,600,915.
• Mekasnisme Pembayaran Bunga • Mechanism of Interest Payment before
sebelum efektif Perjanjian Perdamaian the Effectiveness of the WBP Settlement
WBP, seluruh bunga tertunggak baik Agreement, all outstanding interest both
sebelum maupun pada saat proses before and during the PKPU process will
PKPU berjalan akan ditangguhkan be deferred and will be paid according to
(deferred) dan akan dibayarkan sesuai the Tranche A mechanism, including
mekanisme Tranche A, termasuk bunga interest since the decision to ratify
sejak putusan pengesahan Perjanjian the Settlement Agreement until
Perdamaian sampai dengan putusan the cassation decision.
kasasi.
• Bunga setelah efektif Perjanjian • Interest after effective WBP Settlement
Perdamaian WBP berdasarkan Agreement based on the WBP
Perjanjian Perdamaian WBP, tingkat Settlement Agreement, the interest rate
suku bunga yang berlaku sesuai jangka that applies according to
waktu pelaksanaan Perjanjian the implementation period of the WBP
Perdamaian WBP dengan debitur atas Settlement Agreement with debtors on
nama WBP sebagai berikut: behalf of WBP is as follows:
- Tahun ke 1 sampai dengan 9 - Years 1 to 9 at 2%;
sebesar 2%;
- Tahun ke 10 sampai dengan ke 13 - Years 10 to 13 at 3%;
sebesar 3%;
- Diatas tahun ke 13 sebesar 4%. - Over the 13th year at 4%.
• Mekanisme pembayaran bunga setelah • Interest payment mechanism after
efektif Perjanjian Perdamaian WBP: the WBP Settlement Agreement
becomes effective:
- Pembayaran bunga akan dilakukan - Interest payments will be made on
pada tanggal 25 yang jatuh tempo the 25th which is due every 6
pada setiap 6 bulan dari tahun months of the current year after the
berjalan setelah tanggal berlaku effective date starting from March
diawali sejak bulan Maret 2023. 2023.
- Dalam hal tanggal pembayaran - In the event that the interest
bunga tersebut bertepatan dengan payment date coincides with a
hari libur termasuk hari Sabtu atau holiday including Saturday or a
hari libur nasional, pembayaran national holiday, the interest
bunga tersebut akan dilakukan payment will be made on the
pada hari kerja berikutnya. following business day.
• Koreksi bunga dan denda sebelum • Correction of interest and penalties prior to
efektif Perjanjian Perdamaian WBP. the effectiveness of the WBP Settlement
Bunga, denda dan biaya lainnya dari 26 Agreement. Interest, fines and other fees
Supplier WBP dilakukan koreksi dan from 26 WBP Suppliers are corrected and
dicatat disisi WBP sebagai: recorded on the WBP side as:
- Terhadap bunga sebelum tanggal - For interest before the effective date
efektif berlaku Perjanjian of the WBP Settlement Agreement,
Perdamaian WBP dilakukan corrections are made.
koreksi.
- Seluruh benda dan biaya lainnya - All objects and other costs that were
yang terdahulu dihapuskan. previously written off.
• Pembentukan fasilitas baru WBP dan • Establishment of a new WBP facility and
mekanisme pengalihan sebagai berikut: transfer mechanism as follow
- Fasilitas baru dibentuk atas nama - A new facility was formed on behalf
WBP yang medncakup pokok of WBP which includes a principal
- 160 -
Page 158
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
sebesar Rp270.691.05.539 dan amounting to Rp270,691,05,539
bunga dicatat sesuai ketentuan and interest is recorded in
pada Perjanjian Perdamaian WBP. accordance with the provisions of
the WBP Settlement Agreement.
- Terhadap biaya buga, denda dan - Interest costs, fines and other costs
biaya lainnya pada supplier/sub to the Supplier/Sub-Contractor will
kontraktor akan dikoreksi sesuai be corrected according to the WBP
Perjanjian Perdamaian WBP dan Amicable Agreement and recorded
dicatat di sisi WBP. on the WBP side.
- Mekanisme pengalihan dilakukan - The transfer mechanism is carried
secara bertahap sebagai out in stages as the establishment
pembentukan fasilitas kredit WBP of a WBP credit facility in
sesuai ketentuan yang berlaku di accordance with the applicable
Bank Mandiri dengan total fasilitas provisions at Bank Mandiri with a
senilai Rp270.691.905.539 dalam total facility of Rp270,691,905,539
rangka pelaksanaan Perjanjian in the context of implementing the
Perdamaian. Settlement Agreement.
• Mekanisme pembayaran pokok • Principal payments are made in bullet
dilakukan secara bullet payment pada payments in the 17th year from the
tahun ke 17 sejak tanggal berlaku effective date of the WBP Settlement
Perjanjian Perdamaian WBP. Agreement.
• Dimungkinkan percepatan pelunasan • It is possible to accelerate payment
dengan pembayaran (pre-payment) (prepayment) in the 10th year from the
pada tahun ke 10 sejak tanggal berlaku effective date if the results of the
apabila hasil pemeriksaan dan evaluasi inspection and evaluation in the 7th year
pada tahun ke-7 sejak tanggal berlaku from the effective date by the
oleh Agen Pemantau Independen Independent Monitoring Agent show that
menunkukkan bahwa WBP memiliki the WBP has the financial capacity to
kemampuan keuangan untuk complete its obligations.
menyelesaikan kewajibannya
Pihak Ketiga Third Parties
Berdasarkan Perjanjian Perdamaian dalam PKPU Based on the Reconciliation Agreement in PKPU this
fasilitas pinjaman ini direstrukturisasi menjadi Utang loan facility was restructured into Long-Term Bank
Bank Jangka Panjang sebagai berikut: Loans as follows:
Pinjaman Bank - Kredit Modal Kerja
Tanggal Tingkat bunga per
Jenis fasilitas/ Fasilitas perjanjian/ Tanggal jatuh tahun/ 31 Maret/ 31 Desember/
Kreditur/ Entitas/ Type of maksimum/ Agreement tempo/ Interest rate per March 31, December 31,
Creditors Entities facilities Maximum facility date Maturity date annum 2024 2023
PT Bank DKI WBP/ WBP Kredit Modal 698.988.751.911 2 Juni 2020/ Jatuh tempo 2,00% 118.434.185.683 118.434.185.683
Kerja/ Working June 2, 2020 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
PT Bank Tabungan WBP/ WBP Kredit Modal 614.149.511.847 12 Oktober 2020/ Jatuh tempo 2,00% 613.182.849.796 614.149.511.847
Pensiunan Nasional Tbk Kerja/ Working Ocktober 12, pada tahun ke 17
Capital Credit 2020 sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
PT Bank Permata Tbk WBP/ WBP Kredit Modal 459.997.319.257 13 Agustus 2021/ Jatuh tempo 2,00% 459.292.521.370 459.997.319.257
Kerja/ Working August 13, 2021 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
PT Bank CTBC WBP/ WBP Kredit Modal 325.656.250.000 30 Maret 2022/ Jatuh tempo 2,00% 325.150.690.598 325.656.250.000
Indonesia Kerja/ Working March 30, 2022 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
PT BCA Syariah WBP/ WBP Kredit Modal 111.019.443.140 23 Maret 2022/ Jatuh tempo 2,00% 110.842.053.876 111.019.443.140
Kerja/ Working March 23, 2022 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
- 161 -
Page 159
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
PT Bank ICBC WBP/ WBP Kredit Modal 81.273.937.783 21 Juni 2022/ Jatuh tempo 2,00% 81.143.514.438 81.273.937.783
Indonesia Kerja/ Working June 21, 2022 pada tahun ke 17
Capital Credit sejak tanggal
efektif/ Due in
the 17th year
from the effective
date
1. PT Bank BTPN Tbk 1. PT Bank BTPN Tbk
Berdasarkan perubahan Perjanjian Fasilitas No. Based on the amendment to Facility Agreement
L/2020/WBG/X/07 tanggal 12 Oktober 2020, No. L/2020/WBG/X/07 dated October 12, 2020,
WBP memperoleh fasilitas kredit dari PT Bank WBP obtained a credit facility from PT Bank
BTPN Tbk sebagai berikut: BTPN Tbk as follows:
1. Pinjaman untuk tujuan modal kerja sebesar 1. Loan for working capital purposes
Rp250.000.000.000, dengan jangka waktu amounting to Rp250,000,000,000, with a
sampai dengan tanggal 30 April 2021 term until April 30, 2021 with an interest rate
dengan suku bunga 9% per tahun. of 9% per annum.
2. Commercial LC untuk tujuan impor atau 2. Commercial LC for purposes of importing or
pembelian lokal atas bahan baku atau local purchasing of raw materials or
peralatan untuk kegiatan bisnis WBP melalui equipment for WBP business activities
penerbitan LC dan LC usance lokal, sight, through the issuance of LC and LC local
LC usance, payable at sight (LC UPAS), LC usance, sight, LC usance, payable at sight
usance payable at usance (LC UPAU) (LC UPAS), LC usance payable at usance
sebesar Rp850.000.000.000, dengan jangka (LC UPAU) amounting to
waktu sampai dengan tanggal 30 April 2021. Rp850,000,000,000, with the term until April
30, 2021.
3. Acceptance untuk tujuan akseptasi LC 3. Acceptance for purposes of LC usance or
usance ataupun LC lokal sebesar local LC of Rp850,000,000,000, with the
Rp850.000.000.000, dengan jangka waktu term of six (6) months.
enam (6) bulan.
4. Loan on note trust receipt untuk tujuan 4. Loan on note trust receipt for payment of LC
pembayaran LC ataupun LC lokal sebesar or local LC of Rp850,000,000,000, with a
Rp850.000.000.000, dengan jangka waktu term of three (3) months from
selama tiga (3) bulan sejak tanggal jatuh the LC due date or if shorter and may be
tempo LC atau apabila lebih singkat dapat extended to six (6) months from the date of
diperpanjang hingga enam (6) bulan dari issuance of LC or local LC with interest rate
tanggal penerbitan LC ataupun LC lokal, of 9% per annum.
dengan suku bunga 9% per tahun.
5. Guarantee untuk tujuan penerbitan bank 5. Guarantee for issuance of bank guarantee in
garansi dalam bentuk payment bond, bid the form of payment bond, bid bond,
bond, performance bond, dan maintenance performance bond, and maintenance bond,
bond, sehubungan dengan bisnis peminjam, in connection with the borrower's business
sebesar Rp850.000.000.000, dengan jangka amounting to Rp850,000,000,000, with a
waktu selama 12 bulan namun tidak period of 12 months but excluding the 30-
termasuk periode klaim 30 hari kalender. days calendar claim period.
6. Loan on note account payable financing 6. Loan on note account payable financing for
untuk tujuan pembiayaan terkait dengan financing purposes related to payments to
pembayaran kepada supplier peminjam the borrower's suppliers of
sebesar Rp850.000.000.000, dengan jangka Rp850,000,000,000, with a maximum period
waktu maksimum selama enam (6) bulan of six (6) months and is non-rolloverable and
dan bersifat non-rolloverable, dengan suku interest rate 8.8% per annum.
bunga 8,8% per tahun.
7. Loan on note discounted account payable 7. Loan on note discounted account payable
financing untuk tujuan pembiayaan terkait financing for financing purposes related to
dengan pembayaran kepada supplier payments to the borrower's suppliers of
peminjam sebesar Rp850.000.000.000, Rp850,000,000,000, with a maximum period
dengan jangka waktu maksimum selama of six (6) months and is nonextendable and
enam (6) bulan dan bersifat non- interest rate 8.8% per annum.
rolloverable, dengan suku bunga 8,8% per
tahun.
8. Loan on Note Account Receivable Financing 8. Loan on Note Account Receivable Financing
untuk tujuan pembiayaan terkait piutang- for financing purposes related to borrower's
piutang peminjam terhadap pelanggan receivables to customers amounting to
sebesar Rp500.000.000.000, dengan jangka Rp500,000,000,000,000, with a maximum
waktu maksimum selama 4 (empat) bulan
- 162 -
Page 160
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dan bersifat non-rolloverable, dengan suku term of 4 (four) months and non-rolloverable,
bunga 8,8% per tahun. with an interest rate of 8.8% per annum.
Fasilitas pinjaman ini dijamin oleh piutang usaha These loan facilites are collaterized by all current
saat ini atau akan datang dengan nilai or future accounts receivable with minimum
penjaminan minimum sebesar collateral value amounting to
Rp1.495.103.746.768 atau 125% dari limit Rp1,495,103,746,768 or 125% of the combined
gabungan yang sudah diikat secara fidusia. limit and which has been tied by fiduciary.
Pembatasan: Negative Covenants:
1. Memasang atau mengizinkan adanya atau 1. Installing or permitting the presence or
dipasangnya Hak Jaminan atas aset- installation of security rights over its assets;
asetnya;
2. Menjual, mengalihkan, atau melepaskan 2. Sell, transfer, or otherwise dispose of its
aset- asetnya dengan ketentuan-ketentuan assets with the provisions in which these
dimana aset-aset tersebut dapat disewakan assets can be leased or bought back by the
atau dibeli kembali oleh Peminjam; Borrower;
3. Menjual, mengalihkan, atau melepaskan 3. Sell, transfer, or dispose of its receivables
piutangnya dengan hak regres; with resource;
4. Mengadakan pengaturan apapun dimana 4. Entered into any arrangement where
uang atau manfaat bank atau rekening lain the money or the benefits of a bank or other
dapat digunakan untuk pembayaran, account may be used for payments, made
dilakukan kompensasi (set off) atau compensation (set off) or the possibility of
dimungkinkannya penggabungan beberapa combining multiple accounts;
rekening; atau
5. Mengadakan pengaturan prioritas 5. Hold priority setting receipts have
penerimaan pembayaran yang memiliki the same effect.
dampak yang sama.
Pinjaman BTPN akan jatuh tempo pada tahun ke BTPN loans will be due on the 17th year from
17 sejak Tanggal Efektif. Effective Date.
2. PT Bank Permata Tbk 2. PT Bank Permata Tbk
Berdasarkan Perjanjian Pembiayaan Based on the Financing Agreement No.
No. 451/BP/LOO/CRC-JKT/WB/VIII/2021 pada 451/BP/LOO/CRC-JKT/WB/VIII/2021 On August
tanggal 13 Agustus 2021, WBP memperoleh 13, 2021, WBP obtained an Omnibus financing
fasilitas pembiayaan Omnibus sebesar facility of Rp400,000,000,000 with a term of up to
Rp400.000.000.000 dengan jangka waktu July 26, 2022, with the following sub-limits:
sampai dengan tanggal 26 Juli 2022, dengan sub
limit sebagai berikut:
1. LC/SKBDN/PIF/BG untuk pembelian bahan 1. LC/SKBDN/PIF/BG for the purchase of raw
baku, peralatan-peralatan, dan pembayaran materials, equipment, and sub- contractor
sub-kontraktor yang dibutuhkan sehubungan payments needed in connection with the
dengan proyek Nasabah, untuk pembiayaan Customer's project, for financing the
LC/SKBDN Nasabah yang jatuh tempo, Customer's LC/SKBDN that is due, as well
serta untuk memenuhi kebutuhan BG atas as to meet BG needs for the project obtained
proyek yang didapatkan Nasabah by the Customer amounting to
sebesar Rp400.000.000.000 dengan suku Rp400,000,000,000 with an interest rate of
bunga sebesar 9,5% per tahun dan 10% per 9.5% per annum and 10% per annum for
tahun untuk PIF. PIF.
2. Payable Services untuk membiayai tagihan 2. Payable Services to finance Non-LC/non-
atau transaksi Non-LC/non-SKBDN atas SKBDN invoices or transactions for trade in
perdagangan barang terkait dengan proyek- goods related to projects undertaken by the
proyek yang dikerjakan Nasabah sebesar Customer in the amount of
Rp400.000.000.000 dengan suku bunga Rp400,000,000,000 with an interest rate of
sebesar 10% per tahun. 10% per annum.
3. Musyarakah Mutanaqisah (MMQ) atau 3. Musyarakah Mutanaqisah (MMQ) or
Revolving Financing iB merupakan Revolving Financing iB is financing for
pembiayaan kebutuhan umum modal kerja general working capital needs in connection
sehubungan dengan aktivitas usaha with the Customer's business activities of
Nasabah sebesar Rp300.000.000.000 Rp300,000,000,000 with an interest rate of
dengan suku bunga sebesar 11% per tahun. 11% per annum.
- 163 -
Page 161
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
4. Revolving Loan untuk pembiayaan 4. Revolving Loan to finance general working
kebutuhan umum modal kerja sehubungan capital needs in connection with the
dengan aktivitas usaha Nasabah Customer's business activities of
sebesar Rp100.000.000.000 dengan suku Rp100,000,000,000 with an interest rate of
bunga sebesar 10,5% per tahun. 10.5% per annum.
Penggunaan Limit dan Sub Limit secara The use of Limit and Sub Limit as a whole may
keseluruhan tidak boleh melebihi not exceed Rp400,000,000,000.
Rp400.000.000.000.
Pembatasan terhadap tindakan: Restriction of covenant:
1. Bertindak sebagai penjamin terhadap 1. Binds itself as surety against the other party,
hutang pihak lain, kecuali hutang dagang except in order to perform daily business
yang dibuat dalam rangka menjalankan activites;
usaha sehari-hari;
2. Mengubah sifat dan kegiatan usaha yang 2. Change the business activities or run the
sedang dijalankan atau melakukan kegiatan new business opening other than an existing
usaha diluar kegiatan usahanya sehari-hari; business;
3. Menjaminkan, mengalihkan, menyewakan, 3. Mortgaging, transferring, leasing, submitting
menyerahkan kepada pihak lain atas barang collateral to the other party;
jaminan.
4. Memberikan pinjaman maupun fasilitas 4. Provide loans or other financial facility to or
keuangan kepada atau dari pihak lain from the other party except for short-term
kecuali dalam jangka pendek dan dalam and in order to drive the daily business
rangka menunjang kegiatan usahanya activities;
sehari-hari;
5. Melakukan penyertaan yang berpengaruh 5. Make new investments that could affect to
terhadap kemampuan membayar; the payment quality;
6. Melakukan tindakan lainnya yang dapat 6. Taking actions that could affect the
menyebabkan atau terganggunya kewajiban obligation to the bank;
yang terhutang kepada bank;
7. Melakukan pembubaran, penggabungan 7. Liquidation of corporate, business
usaha dan/ atau peleburan dengan combination, and/ or merger with other
Perusahaan lain atau memperoleh sebagian Company or obtain the part of other
besar dari aset dari Perusahaan lain atau Company’s assets or other business
bentuk perubahan usaha lainnya; changes;
8. Mengubah susunan dan jumlah kepemilikan 8. Change the form and quantities of
pemegang saham tertutup dan/ atau the shareholder (except Stated Owned
pemegang saham pengendali Perusahaan Enterprise)
terbuka (kecuali BUMN);
9. Membayar atau menyatakan dapat dibayar 9. Pay or declare of dividend or distribute the
suatu dividen atau pembagian keuntungan gain in any form of shares issued;
berupa apapun juga atas saham yang
dikeluarkan;
10. Membayar kembali tagihan atau piutang 10. Repay the bills or receivables that will given
berupa apapun juga yang sekarang telah now and/ or later from shareholders.
dan/ atau dikemudian hari akan diberikan
oleh pemegang saham.
Pinjaman PT Bank Permata Tbk akan jatuh PT Bank Permata Tbk loans will be due on the
tempo pada tahun ke 17 sejak Tanggal Efektif. 17th year from Effective Date.
3. PT Bank CTBC Indonesia 3. PT Bank CTBC Indonesia
Fasilitas pinjaman ini dijamin oleh piutang usaha This loan facility is colaterallized by trade
dari proyek Perusahaan untuk proyek accounts receivable from the Company project
Pemerintah minimal 125% dari pinjaman yang for a Government project for minimum of 125%
beredar saat ini yang sudah diikat secara fidusia. of current outstanding loan which ties by
fiduciary.
- 164 -
Page 162
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pembatasan terhadap tindakan: Negative convenants or restrictions:
1. Mengubah kegiatan usaha sebagaimana 1. Changing the business activities as stated in
tercantum dalam anggaran dasar yang the Company’s article of association that
dapat mengurangi kemampuan melunasi could reduce the ability to pay off the credit
fasilitas kredit. facility.
2. Menjual atau mengalihkan seluruh aset 2. Sell or transfer all of assets of
Perusahaan dalam satu transaksi atau the Company in a single transaction or in
dalam beberapa transaksi, kecuali: multiple transactions, except:
• Menjual atau mentransfer aset dibawah • Selling or transferring assets under
ketentuan arm’s length dan dengan arrangement that are at arm’s length
tujuan melakukan kegiatan usaha; and in order to run the daily business
activities;
• Menjual atau mentransfer aset sebagai • Selling or transferring assets as a
pengganti atau diganti dengan aset lain replace or to be replaced with another
yang sebanding atau lebih baik comparable assets or better in type,
menurut jenis, sifat, kualitas; nature, quality;
• Menjual atau mentransfer aset yang • Selling or transferring assets that are
tidak berguna atau tidak digunakan not useful or are not anymore used with
dengan persyaratan arm’s length; dan the requirements of arm’s length; and
• Penjualan pengalihan aset per tahun • Selling of transferring assets per year
melebihi Rp500.000.000.000. exceeding of Rp500,000,000,000.
3. Mengubah operasional bisnis saat ini 3. Changing the operation of current
yang dapat menyebabkan hasil material business that may cause material
kecuali diwajibkan oleh hukum yang impact unless required by appllicable
berlaku; law
4. Penggabungan, pemisahan, likuidasi 4. Merging, business combination,
atau rekonstruksi Perusahaan kecuali separation, liquidation or corporate
persyaratan sebagai berikut: reorganization except the following
requirements:
• Reorganisasi dapat dilakukan oleh • Reorganization can be done by
Pemerintah Republik Indonesia the Government of the Republic of
selama tidak memiliki dampak yang Indonesia as long as the impact is
material; not material;
• Tindakan Perusahaan dengan • The corporate actions with
anggota lain dalam kelompok other members in the group
dengan ketentuan mengikuti with the provision following
persyaratan; the requirements;
• Perusahaan akan bertahan sebagai • The Company will survive as legal
badan hukum dan akan memiliki entity and will have the legal status
status hukum setelah tindakan after the corporate action; and
korporasi; dan
• Pemisahan dimana Perusahaan • Separation which the Company
menjadi pemegang terbesar. becomes the mayor shareholders.
5. Perubahan
X Angaran Dasar yang dapat 5. Changes in Articles of Association that
menimbulkan akibat material; can lead to material impact;
6. Mengikat dirinya sendiri sebagai 6. Bind itself as a collateral against
jaminan terhadap pihak lain dan/ atau the other party and/ or pledging
menjamin kekayaan Perusahaan the Company’s assets to other parties,
kepada pihak lain, kecuali yang sudah except those that are already existing;
ada;
7. Usulkan berkas kebangkrutan atau 7. Proposing a file of bankruptcy or
penundaan pembayaran utang kepada postponement of debt payment to
pihak yang berwenang; dan authorized parties; and
8. Melunasi utang kepada pemegang 8. Repay the debt to shareholders/ limited
saham/utang Perusahaan terbatas Company’s debt before the bank repays
sebelum bank melunasi utangnya the debt in advance.
terlebih dahulu.
- 165 -
Page 163
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Berdasarkan surat No. MKT/EXT/063/III/ Based on letter No. MKT/EXT/063/III/2022
2022 tanggal 30 Maret 2022, WBP dated March 30, 2022, WBP obtained credit
memperoleh fasilitas kredit dari CTBC facility from CTBC in the form of working
berupa kredit modal kerja sebesar capital loan amounting to
Rp285.000.000.000 dengan jangka waktu Rp285,000,000,000, with maturity period
jatuh tempo sampai dengan tanggal until December 31, 2023 with an interest rate
31 Desember 2023 dengan suku bunga of JIBOR+4% per annum or minimum 10%
JIBOR+4% per tahun atau minimal 10% per per annum.
tahun.
Pinjaman CTBC akan jatuh tempo pada CTBC loans will be due on the 17th year from
tahun ke 17 sejak Tanggal Efektif. Effective Date.
4. PT Bank BCA Syariah 4. PT Bank BCA Syariah
Berdasarkan surat No. 0285/PRBH- Based on letter No. 0285/PRBH-
BCAS/III/2022 tanggal 23 Maret 2022 terkait BCAS/III/2022 dated March 23, 2022
Perubahan Akad Pembiayaan Musyarakah, regarding the Amendment to Musyarakah
WBP memperoleh fasilitas kredit dari PT Financing Agreement, WBP obtained a
Bank BCA Syariah berupa PMK credit facility from PT Bank BCA Syariah in
Musyarakah (Revolving), sebesar the form of PMK Musyarakah (Revolving),
Rp100.000.000.000, dengan jangka waktu amounting to Rp100,000,000,000, with a
pinjaman sampai dengan tanggal 6 Juni loan term of up to June 6 2022. As at the
2022. Sampai dengan tanggal pelaporan, reporting date, this loan is still in the process
pinjaman ini masih dalam proses of being renewed.
perpanjangan.
Fasilitas ini dijaminkan dengan Piutang This loan facility is secured with
Usaha senilai Rp120.000.000.000. account receivable amounting to
Rp120,000,000,000.
Pembatasan: Negative Covenant:
WBP sebelum atau sesudah pinjaman WBP before or after the facility provided by
diberikan oleh bank, juga mempunyai utang the bank, having loan to the third party that
kepada pihak ketiga dan hal yang demikian not inform to the bank.
tidak diberitahukan kepada bank.
Pinjaman PT Bank BCA Syariah akan jatuh PT Bank BCA Syariah loans will be due on
tempo pada tahun ke 17 sejak Tanggal the 17th year from Effective Date.
Efektif.
5. PT Bank ICBC Indonesia 5. PT Bank ICBC Indonesia
Berdasarkan Perjanjian Kredit No. 152/LOD Based on the Credit Agreement
CBII/XII/2021 tanggal 10 Desember 2021, No. 152/LOD CBII/XII/2021 dated December
WBP mendapatkan kredit modal kerja dari 10, 2021, WBP obtained a working capital
PT Bank ICBC Indonesia dengan jumlah loan from PT Bank ICBC Indonesia with total
fasilitas sebesar Rp73.523.809.678, jangka facility amounting to Rp73.523.809.678, with
waktu pinjaman sampai dengan 31 Maret loan period until March 31, 2022 and the
2022 dengan suku bunga sebesar 9,75% per interest rate amounting to 9.75% per annum.
tahun.
Fasilitas ini dijamin dengan: This loan facility is collateralized by:
1. Piutang
X usaha WBP yang diikat secara 1. Trade accounts receivable of WBP
fidusia. bound under fiduciary.
2. Sisa nilai atau omzet kontrak WBP - 2. Future receivables value or turnover
kontraktor harus dengan PT Waskita of WBP - contractors must by
Karya (Persero) Tbk. PT Waskita Karya (Persero) Tbk.
- 166 -
Page 164
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pembatasan: Negative Covenant:
Menjaminkan aset kepada pihak lain, kecuali Assuring assets to other parties, except
bilamana WBP menjaga DER pada when WBP maintains DER at a maximum of
maksimal sebesar 3x selama periode 3x during the loan period.
pinjaman.
Entitas Anak - WKI Subsidiary - WKI
Pihak Ketiga Third Parties
PT Bank Pembangunan Daerah Jawa Barat dan PT Bank Pembangunan Daerah Jawa Barat dan
Banten Tbk Banten Tbk
Berdasarkan Penawaran Pemberian Kredit No. Based on Credit Offering No. 115/KKO-KO2/2019
115/KKO-KO2/2019 tanggal 30 Oktober 2019, PT dated October 30, 2019, PT Waskita Karya
Waskita Karya Infrastruktur memperoleh fasilitas Infrastruktur obtained credit facilities from PT Bank
kredit dari PT Bank Pembangunan Daerah Jawa Pembangunan Daerah Jawa Barat dan Banten Tbk in
Barat dan Banten Tbk berupa: the form of:
a. Fasilitas Kredit Investasi I dengan maksimal a. Investment Credit Facility I with a maximum loan
pinjaman Rp142.395.000.000 dengan tingkat of Rp142,395,000,000 with an interest rate of
suku bunga 10,50% p.a efektif floating rate. 10.50% p.a effective floating rate. Duration of
Jangka waktu fasilitas sampai dengan 12 facility until August 12, 2025.
Agustus 2025.
b. Fasilitas Kredit 2 - KI IDC dengan maksimal b. Credit Facility 2 - KI IDC with a maximum loan of
pinjaman Rp2.123.000.000 dengan tingkat suku Rp2,123,000,000 with an effective interest rate
bunga 10,50% p.a efektif floating rate. Jangka of 10.50% p.a effective floating rate. Duration of
waktu fasilitas sampai dengan 12 Agustus 2025. facility until August 12, 2025.
c. Fasilitas Kredit KMK R/C Terbatas Swicthable c. KMK R/C Credit Facility Limited Swicthable Non
Non Cash Loan (SCF) dengan maksimal Cash Loan (SCF) with a maximum loan
pinjaman Rp50.000.000.000 dengan tingkat Rp50,000,000,000 with an effective interest rate
suku bunga 10,00% p.a efektif floating rate. of 10.00% p.a floating rate. Facility period is up
Jangka waktu fasilitas sampai dengan 11 to November 11, 2021.
November 2021.
Pinjaman ini dijamin dengan sebidang tanah dan This loan is secured by a plot of land and a building
bangunan dengan estimasi luas tanah 51.848 m2 dan with an estimated land area of 51,848 m2 and a
luas bangunan 8.000 m2, mesin-mesin dengan nilai building area of 8,000 m2, machines with a value of
sebesar Rp58.300.000.000, piutang usaha sebesar Rp58,300,000,000, both existing and accounts
Rp95.000.000.000, dan letter of undertaking notary receivable amounting to Rp95,000,000,000, and a
dari pemegang saham. letter of undertaking notary from the shareholders.
Pembatasan terhadap pinjaman ini antara lain: Restrictions on this loan include:
a. Memindahtangankan agunan; a. Transferring collateral;
b. Memperoleh fasilitas kredit untuk proyek b. Obtain credit facilities for the same project
yang sama yang sudah dibiayai oleh bank; that has been financed by the bank;
c. Menjaminkan harta kekayaan Perusahaan c. Securing company assets pledged to other
yang dijaminkan kepada pihak lain; parties;
d. Mengajukan permohonan dan atau d. Submit an application and or order another
menyuruh pihak lain mengajukan party to submit an application to the court to
permohonan kepada pengadilan untuk be declared bankrupt or postpone payment
dinyatakan pailit atau penundaan of debt;
pembayaran utang;
e. Menyerahkan sebagian atau seluruh hak e. Give up part or all of the rights and or
dan atau kewajiban WKI atas fasilitas kredit obligations of WKI for credit facilities to other
kepada pihak lain. parties.
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As of March 31, 2024 and December 31, 2023, the
saldo pinjaman WKI dari PT Bank Pembangunan balance of WKI’s loan from PT Bank Pembangunan
Daerah Jawa Barat dan Banten Tbk masing-masing Daerah Jawa Barat dan Banten Tbk amounting to
sebesar Rp105.553.239.022 dan Rp108.927.609.265. Rp105,553,239,022 and Rp108,927,609,265.
- 167 -
Page 165
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
34. UTANG VENTURA BERSAMA JANGKA PANJANG 34. LONG-TERM JOINT VENTURES PAYABLES
Akun ini merupakan penerimaan termin dari ventura This account represents the accounts receivables
bersama yang diterima oleh Perusahaan dan akan collection that is received by the Company and will be
diperhitungkan pada saat penutupan kerjasama settled at the end of those joint operations, as follow:
operasi tersebut, sebagai berikut:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Ventura Bersama/ Joint Ventures 1.430.792.639.368 1.332.247.776.159
Jumlah/ Total 1.430.792.639.368 1.332.247.776.159
35. UTANG LAIN-LAIN JANGKA PANJANG 35. OTHER LONG-TERM PAYABLES
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Ketiga/ Third Parties
Provisi Pelapisan Jalan Tol/ Provision For Overlay 263.848.410.303 297.775.952.032
Lain-lain/ Others 39.132.614.533 12.746.680.556
Jumlah/ Total 302.981.024.836 310.522.632.588
Provisi pelapisan jalan tol merupakan beban Provision for Toll Road Overlay represents accruals
akrual pelapisan jalan tol yang dicadangkan for the cost of toll road overlay that is periodically
secara berkala berdasarkan estimasi provided based on estimated utilization of toll road by
penggunaan jalan tol oleh pelanggan. customers.
36. UANG MUKA KONTRAK JANGKA PANJANG 36. ADVANCES ON LONG-TERM CONTRACTS
Rincian saldo uang muka kontrak jangka panjang The details of outstanding advances on long-term
sebagai berikut: contract were as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
PT Pelabuhan Indonesia III (Persero) 7.222.000.000 7.222.000.000
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 61.008.022 61.008.022
Sub Jumlah/ Sub Total 7.283.008.022 7.283.008.022
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 291.370.841.317 294.068.353.821
The Special Administrative Region of Oenuno- Timor Leste 131.046.288.446 131.046.288.446
Pemerintah Daerah/ District Governments 5.480.033.985 5.480.033.985
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 26.198.761.935 33.525.066.656
Sub Jumlah/ Sub Total 454.095.925.683 464.119.742.908
Jumlah/ Total 461.378.933.705 471.402.750.930
37. LIABILITAS SEWA GUNA USAHA 37. LEASE LIABILITIES
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Liabilitas Guna Usaha Leased Liabilities
Tanah 4.426.805.694 4.547.605.850 Land
Bangunan 68.166.778 70.026.936 Building
Kendaraan 14.226.400.272 23.320.872.811 Vehicles
Dikurangi: Bagian Lancar (3.953.575.127) (7.157.455.725) Less: Current Portion
Jumlah Harga Perolehan 14.767.797.617 20.781.049.872 Total Acquisition Cost
Liabilitas sewa guna usaha Perusahaan dijamin The Group’s lease liabilities are secured by
dengan aset sewaan milik penyewa. the lessor’s leased assets.
- 168 -
Page 166
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
38. OBLIGASI WAJIB KONVERSI 38. MANDATORY CONVERTIBLE BONDS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Obligasi Wajib Konversi Mandatory Convertible Bond
Obligasi Tahap 1 Tahun 2023 457.614.726.667 457.614.726.667 Bond 1 Year 2023
Obligasi Tahap 2 Tahun 2023 1.393.155.194.444 1.393.155.194.444 Bond 2 Year 2023
Jumlah 1.850.769.921.111 1.850.769.921.111 Total
Diskonto yang belum diamortisasi (1.177.197.704.987) (1.198.957.481.113) Unamortized discount
Jumlah 673.572.216.124 651.812.439.998 Total
Berdasarkan Pengumuman dari IDX Nomor Peng-P- Based on the Announcement from IDX Number
01325/BEI.PP3/12/2023 tanggal 12 Desember 2023 Peng-P-01325/BEI.PP3/12/2023 dated December
perihal Pencatatan Obligasi Wajib Konversi Waskita 12, 2023 regarding the Recording of Waskita Beton
Beton Precast I Tahun 2023 dan Obligasi Wajib Precast Mandatory Convertible Bonds I of 2023 and
Konversi Waskita Beton Precast II Tahun 2023 Waskita Beton Precast Mandatory Convertible Bonds
PT Waskita Beton Precast Tbk. (WBP), maka II of 2023 PT Waskita Beton Precast Tbk. (WBP), the
dilakukan pencatatan atas Obligasi Wajib Konversi Waskita Beton Precast Mandatory Convertible Bonds
Waskita Beton Precast I Tahun 2023 (WSBP01CB) I of 2023 (WSBP01CB) and Waskita Beton Precast
dan Obligasi Wajib Konversi Waskita Beton Precast Mandatory Convertible Bonds II of 2023
II Tahun 2023 (WSBP02CB), yang telah dicatatkan di (WSBP02CB), which will be listed on the Stock
Bursa tanggal 13 Desember 2023, Exchange on December 13, 2023,
sebagai berikut : as follows :
Obligasi wajib konversi waskita karya beton
Nama obligasi precast I tahun 2023/ Waskita Beton Precast I Obligation’s code
Mandatory Convertible Bonds in 2023
Kode obligasi WSBP01CB Obligation code
Kode ISIN IDC000013904 ISIN Code
Nilai emisi Rp457.614.726.667 Emission value
Tingkat bunga 0,00% (Zero Coupon) Interest rate
Tingkat jatuh tempo 12 Desember 2023/ December 12, 2023 Due date
Tanggal konversi saham tambahan 12 Desember 2023 (10 tahun sejak tanggal Additional share conversion date
penerbitan)/ December 12, 2023 (10 years from the
date of issue)
Obligasi wajib konversi waskita karya beton
Nama obligasi precast II tahun 2023/ Waskita Beton Precast II Obligation’s code
Mandatory Convertible Bonds in 2023
Kode obligasi WSBP02CB Obligation code
Kode ISIN IDC0000140001 ISIN Code
Nilai emisi Rp1.393.155.194.444 Emission value
Tingkat bunga 0,00% (Zero Coupon) Interest rate
Tingkat jatuh tempo 12 Desember 2023/ December 12, 2023 Due date
Tanggal konversi saham tambahan 12 Desember 2023 (10 tahun sejak tanggal Additional share conversion date
penerbitan)/ December 12, 2023 (10 years from the
date of issue)
Wali Amanat PT Bank Mega Tbk Trustee
Tanggal penerbitan 12 Desember 2023/ December 12, 2023 Publication date
Tanggal pencatatan 13 Desember 2023/ December 13, 2023 Recording date
Tanggal pembayaran bunga pertama Tidak ada bunga yang dibayarkan/ No interest paid First interest payment date
Periode pembayaran bunga Tidak ada/ There isn’t any Interest payment period
Lembaga peringkat PT Pemeringkat Efek Indonesia (Pefindo) Rating agency
Hasil pringkat Id B/ (Single B) Rangking results
Berdasarkan Akta Notaris No 37 tanggal 29 Based on Notarial Deed No. 37 dated November 29,
November 2023 dari Notaris Dewantari Handayani, 2023 from Notary Dewantari Handayani, SH, MPA,
SH, MPA, mengenai Perubahan II Perjanjian regarding Amendment II of the Trustee Agreement for
Perwaliamanatan Obligasi Wajib Konversi Waskita Compulsory Convertible Bonds of Waskita Beton
Beton Precast I Tahun 2023, telah ditetapkan menjadi Precast I Year 2023, it has been determined to
OWK dengan syarat-syarat sebagai berikut: become OWK with the following conditions:
1. Nama OWK: Obligasi Wajib Konversi Waskita 1. OWK Name: Waskita Beton Precast Mandatory
Beton Precast I Tahun 2023. Convertible Bonds I Year 2023.
2. Utang pokok OWK: Seluruh nilai Pokok OWK 2. OWK principal debt: The entire principal value of
berjumlah Rp457.614.726.667 yang memiliki OWK amounts to Rp457,614,726,667 which has
- 169 -
Page 167
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
opsi konversi menjadi saham baru yang a conversion option into new shares issued by
diterbitkan oleh Emiten, dengan satuan the Issuer, with an OWK transfer unit of Rp1,00
pemindahbukuan OWK adalah senilai Rp1.00
3. Jatuh Tempo: 3. Due Date:
a. Tanggal Konversi OWK menjadi Saham a. The date of conversion of OWK into
Hasil Konversi yaitu pada tahun ke 10 sejak Converted Shares is the 10th year from the
tanggal Penerbitan OWK, yaitu pada tanggal date of Issuance of OWK, namely December
12 Desember 2033. 12, 2033
b. Jumlah OWK yang akan dikonversi oleh b. The amount of OWK that will be converted
Emiten pada tanggal Konversi adalah by the Issuer on the Conversion date is at the
dengan harga yang sama dengan jumlah same price as the Principal amount of OWK
Pokok OWK yang tertulis pada Konfirmasi written on the Written Confirmation owned by
Tertulis yang dimiliki oleh Pemegang OWK the OWK Holder on the Conversion date.
pada tanggal Konversi.
c. Nilai nominal dari Saham Hasil Konversi c. The nominal value of the Converted Shares
pada saat Emiten hendak melaksanakan when the Issuer wishes to carry out the
konversi atas OWK menjadi Saham Hasil conversion of OWK into Convertible Shares
Konversi pada Tanggal Konversi, nilai on the Conversion Date, the nominal value
nominal dari Saham Hasil Konversi dihitung of the Converted Shares is calculated based
berdasarkan Volume-Weighted Average on the Volume-Weighted Average Price
Price (VWAP) selama 45 (empat puluh lima) (VWAP) for 45 (forty five) days before the
hari sebelum utang Tranche C telah secara Tranche C debt has effectively converted to
efektif dikonversi menjadi OWK. OWK
d. Pelaksanaan Konversi OWK menjadi Saham d. Implementation of OWK Conversion into
Hasil Konversi. Converted Shares.
4. OWK Merupakan Bukti Utang 4. OWK is Proof of Debt
• Berdasarkan pernyataan Emiten sekarang • Based on the Issuer's current statement but
tetapi berlaku sejak Tanggal Penerbitan valid from the OWK Issuance Date, the OWK
OWK, OWK merupakan bukti bahwa Emiten is proof that the Issuer legally and bindingly
secara sah dan mengikat berhutang kepada owes the OWK Holder the amount of OWK
Pemegang OWK sejumlah Pokok OWK Principal stated in the OWK Jumbo
yang disebut dalam Sertifikat Jumbo OWK Certificate plus the Fines (if any) which must
ditambah dengan Denda (jika ada) yang be paid by the Issuer by converting it into
wajib dibayar oleh Emiten dengan cara Convertible Shares on the Conversion Date,
dikonversi menjadi Saham Hasil Konversi based on the OWK Trustee Agreement and
pada Tanggal Konversi, berdasarkan Conversion Agent Agreement. The OWK is
Perjanjian Perwaliamanatan OWK dan an important part and cannot be separated
Perjanjian Agen Konversi. OWK tersebut from the OWK Trusteeship Agreement.
merupakan bagian penting dan tidak dapat
dipisahkan dari Perjanjian Perwaliamanatan
OWK.
• Bukti kepemilikan OWK bagi Pemegang • Proof of OWK ownership for OWK Holders is
OWK adalah Konfirmasi Tertulis yang Written Confirmation issued by the Account
diterbitkan oleh Pemegang Rekening dan Holder and administered by KSEI based on
diadministrasikan oleh KSEI berdasarkan 43 43 Securities Account Opening Agreements
Perjanjian Pembukaan Rekening Efek yang signed by the OWK Holder and the Account
ditandatangani Pemegang OWK dan Holder.
Pemegang Rekening.
5. Pendaftaran OWK di KSEI 5. OWK registration at KSEI
• OWK didaftarkan pada KSEI berdasarkan • OWK is registered with KSEI based on an
Perjanjian Pendaftaran OWK di KSEI yang Agreement Registration of OWK at KSEI
dibuat di bawah tangan bermeterai cukup, which is made under the hand of sufficient
dengan memperhatikan ketentuan di bidang stamp duty, taking into account provisions in
Pasar Modal dan ketentuan KSEI yang the Capital Market sector and applicable
berlaku. KSEI provisions.
• OWK diterbitkan tanpa warkat kecuali • OWK is issued without script except for the
Sertifikat Jumbo OWK yang diterbitkan untuk Jumbo OWK Certificate which is issued to be
didaftarkan atas nama KSEI sebagai bukti registered in the name of KSEI as proof of
- 170 -
Page 168
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
hutang untuk kepentingan Pemegang OWK debt for the benefit of the OWK Holder
melalui Pemegang Rekening. through the Account Holder.
6. Penarikan OWK 6. Withdrawal of OWK
Penarikan OWK dari Rekening Efek hanya dapat Withdrawing OWK from a Securities Account can
dilakukan dengan pemindahbukuan dari satu only be done by transferring it from one
Rekening Efek ke Rekening Efek lainnya. Securities Account to another Securities
Account.
7. Pengalihan OWK 7. OWK redirection
Hak kepemilikan OWK beralih dengan OWK ownership rights are transferred by
pemindahbukuan OWK dari satu Rekening Efek transferring OWK from one Securities Account to
ke Rekening Efek lainnya. Emiten, Wali Amanat another Securities Account. The Issuer, Trustee
dan KSEI memberlakukan Pemegang Rekening and KSEI treat the Account Holder as the legal
selaku Pemegang OWK yang sah dalam OWK Holder in relation to receiving rights related
hubungannya untuk menerima hak-hak yang to the OWK.
berhubungan dengan OWK.
8. Pembelian Kembali 8. Buyback
Emiten dan/atau suatu pihak ketiga dapat The issuer and/or a third party can repurchase
melakukan pembelian kembali atas OWK, baik OWK, either in part or in whole.
sebagian maupun seluruhnya.
9. Minimum Kepemilikan OWK dan/atau Satuan 9. Minimum OWK Ownership and/or OWK Trading
Perdagangan OWK Unit
• Minimum kepemilikan OWK adalah sebesar • Minimum OWK ownership is Rp1 or
Rp1 atau kelipatannya. multiples thereof.
• Sesuai keputusan Rapat Umum Pemegang • In accordance with the decision of the
Obligasi Berkelanjutan I Waskita Beton General Meeting of Sustainable
Precast Tahap I Tahun 2019 tertanggal 15- Bondholders I Waskita Beton Precast Phase
02-2023, Satuan Perdagangan OWK di I 2019 dated 15-02-2023, OWK Trading
Bursa Efek dilakukan dengan nilai sebesar Units on the Stock Exchange were carried
Rp5.000.000 dan/atau kelipatannya out with a value of Rp5,000,000 and/or
dan/atau dengan nilai sebesar Rp1 dan/atau multiples thereof and/or with a value of Rp1
kelipatannya, atau dengan nilai and/or multiples thereof, or with a value as
sebagaimana ditentukan dalam peraturan determined in the Stock Exchange
Bursa Efek dan/ atau perjanjian tersendiri regulations and/ or a separate agreement
yang ditandatangani oleh Emiten dan Bursa signed by the Issuer and the Stock
Efek. Exchange.
• Sesuai peraturan/ ketentuan Bursa Efek • In accordance with the Stock Exchange
yang berlaku pada saat Perjanjian rules/ conditions in effect at the time this
Perwaliamanatan OWK ini ditandatangani, OWK Trustee Agreement was signed,
yaitu sesuai Surat Edaran Bursa Efek namely in accordance with the Indonesian
Indonesia Nomor SE-00016/BEI/07-2021 Stock Exchange Circular Letter Number SE-
tanggal 12-07-2021 perihal Parameter 00016/BEI/07-2021 dated 07-12-2021
Perdagangan Efek Bersifat Utang dan Sukuk regarding Trading Parameters for Debt
di Sistem Penyelenggara Pasar Alternatif Securities and Sukuk in the Alternative
(SPPA), diatur antara lain parameter satuan Market Organizer System (SPPA), regulated
perdagangan di papan retail corporate among other things, trading unit parameters
bonds (retail corps) sebesar Rp1.000.000, on the retail corporate bonds (retail corps)
maka Satuan Perdagangan OWK di Bursa board at Rp1,000,000, then the OWK
Efek dilakukan dengan nilai sebesar Trading Unit on the Stock Exchange is
Rp1.000.000 dan/atau kelipatannya. carried out at a value of Rp1,000,000 and/or
multiples thereof.
10. Jaminan dan Hak Senioritas Atas Utang 10. Collateral and Seniority Rights on Debt
OWK tidak dijamin dengan jaminan khusus. OWK is not guaranteed by any special guarantee
- 171 -
Page 169
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
11. Sanksi 11. Punishment
Apabila Emiten tidak memenuhi kewajiban dalam If the Issuer does not fulfill the obligations in
Perjanjian Perwaliamanatan OWK, maka Emiten the OWK Trusteeship Agreement, the Issuer may
dapat dikenakan sanksi sesuai dengan be subject to sanctions in accordance with the
Perjanjian Perwaliamanatan OWK antara lain OWK Trusteeship Agreement, including if the
apabila Emiten tidak melakukan konversi OWK Issuer does not convert the OWK into Convertible
menjadi Saham Hasil Konversi pada Tanggal Shares on the Conversion Date, then the Issuer
Konversi, maka Emiten wajib membayar Denda. is obliged to pay a Fine.
12. Lain-lain 12. Others
• Kewajiban Emiten berdasarkan OWK pada • The Issuer's obligations under the OWK at all
setiap waktu merupakan kewajiban Emiten times constitute the Issuer's legal obligations
yang sah dan yang tidak bersyarat serta and are unconditional and absolute.
bersifat mutlak.
• Konversi Pokok OWK menjadi Saham Hasil • Conversion of OWK Principal into
Konversi dan pembayaran Denda (jika ada) Conversion Shares and payment of Fines (if
merupakan hak dari para Pemegang OWK. any) are the rights of OWK Holders.
• Bank Kustodian atau Perusahaan Efek yang • Custodian Banks or Securities Companies
merupakan Pemegang Rekening dapat which are Account Holders can act for
bertindak untuk dirinya sendiri atau themselves or based on a power of attorney
berdasarkan surat kuasa bertindak untuk to act for and on behalf of their customers as
dan atas nama nasabahnya sebagai OWK Holders.
Pemegang OWK.
• Bagi Pemegang OWK berlaku ketentuan • For OWK Holders, tax provisions apply in
perpajakan sesuai dengan peraturan accordance with the laws and regulations in
perundang-undangan yang berlaku di force in the Republic of Indonesia and if the
Negara Republik Indonesia dan apabila Issuer is required by the laws and regulations
Emiten diwajibkan oleh peraturan in force in the Republic of Indonesia to
perundang-undangan yang berlaku di withhold tax on every payment made by the
Negara Republik Indonesia untuk memotong Issuer to OWK Holders,
pajak atas setiap pembayaran yang the Issuer through The Payment Agent must
dilakukan oleh Emiten kepada Pemegang withhold the tax and pay it to the agency
OWK, Emiten melalui Agen Pembayaran appointed to receive tax payments and
harus memotong pajak tersebut dan through the Payment Agent will provide proof
membayarkannya kepada instansi yang of tax withholding to the OWK Holder.
ditunjuk untuk menerima pembayaran pajak
serta melalui Agen Pembayaran akan
memberikan bukti pemotongan pajak
kepada Pemegang OWK.
• Pembayaran manfaat lain atas OWK (jika • Payment of other benefits for OWK (if any)
ada) akan dilakukan melalui KSEI will be made through KSEI based on the
berdasarkan instruksi Emiten dengan tetap Issuer's instructions while still taking into
memperhatikan hasil keputusan RUPO dan account the results of the RUPO decision
ketentuan dalam Perjanjian and the provisions in this Trustee
Perwaliamanatan ini. Agreement.
Berdasarkan Akta Notaris No. 40 tanggal 29 Based on Notarial Deed No. 40 dated November
November 2023 dari Notaris Dewantari Handayani, 29th, 2023 from Notary Dewantari Handayani, S.H.,
S.H., MPA, mengenai Perubahan II Perjanjian MPA, regarding Amendment II to the Waskita Beton
Perwaliamanatan Obligasi Wajib Konversi Waskita Precast 2023 Mandatory Convertible Bond Trustee
Beton Precast II Tahun 2023, telah ditetapkan Agreement II 2023, several OWK conditions have
menjadi OWK dengan syarat-syarat sebagai berikut: been stipulated as follows:
1. Nama OWK: Obligasi Wajib Konversi Waskita 1. OWK name: Waskita Beton Precast II Mandatory
Beton Precast II Tahun 2023. Convertible Bonds for 2023
2. Utang Pokok OWK: 2. OWK Principal Debt:
• Seluruh nilai Pokok OWK berjumlah • The entire principal value of OWK is
Rp1.393.155.194.444 yang memiliki opsi Rp1,393,155,194,444 which has a
konversi menjadi saham baru yang conversion option into new shares issued by
diterbitkan oleh Emiten. Emiten berhak untuk the Issuer. The issuer has the right to convert
mengkonversi OWK menjadi saham baru OWK into new shares issued by
- 172 -
Page 170
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
yang diterbitkan oleh Emiten dalam jangka the Issuer within a period of 10 years from
waktu 10 tahun sejak Emiten mendapatkan the time the Issuer obtains all required
seluruh persetujuan korporasi yang corporate approvals or from the OWK
dibutuhkan atau sejak Tanggal Penerbitan Issuance Date.
OWK.
• Satuan pemindahbukuan OWK adalah • The OWK transfer unit is Rp1 or multiples
senilai Rp1 atau kelipatannya. thereof.
3. Jatuh Tempo OWK: 3. OWK Due Date:
a. Tanggal Konversi OWK menjadi Saham a. The date of conversion of OWK into
Hasil Konversi yaitu pada tahun ke 10 sejak Converted Shares is the 10th year from the
Tanggal Penerbitan OWK, yaitu pada OWK Issuance Date, namely December 12,
tanggal 12 Desember 2033, dengan 2033, taking into account the provisions in
memperhatikan ketentuan dalam Perjanjian the OWK Trustee Agreement. This is by
Perwaliamanatan OWK. Hal tersebut taking into account other provisions in
dengan mengindahkan ketentuan lainnya the OWK Trusteeship Agreement, especially
dalam Perjanjian Perwaliamanatan OWK, the provisions of the OWK Trusteeship
khususnya ketentuan Perjanjian Agreement.
Perwaliamanatan OWK.
b. Jumlah OWK yang akan dikonversi oleh b. The amount of OWK that will be converted
Emiten pada tanggal Konversi adalah by the Issuer on the Conversion Date is at
dengan harga yang sama dengan jumlah the same price as the Principal amount of
Pokok OWK yang tertulis pada Konfirmasi OWK written on the Written Confirmation
Tertulis yang dimiliki oleh Pemegang OWK owned by the OWK Holder on
pada Tanggal Konversi. the Conversion Date.
c. Nilai nominal dari Saham Hasil Konversi c. The nominal value of the Converted Shares
pada saat Emiten hendak melaksanakan when the Issuer wishes to carry out
konversi atas OWK menjadi Saham Hasil the conversion of OWK into Convertible
Konversi pada Tanggal Konversi, nilai Shares on the Conversion Date, the nominal
nominal dari Saham Hasil Konversi dihitung value of the Converted Shares is calculated
berdasarkan Volume Weighted Average based on the Volume Weighted Average
Price (VWAP) selama 45 hari sebelum utang Price (VWAP) for 45 days before the
Tranche C telah secara efektif dikonversi Tranche C debt has been effectively
menjadi OWK. Yang dimaksud dengan converted become an OWK. What is meant
VWAP adalah tolak ukur untuk menentukan by VWAP is a benchmark for determining the
harga rata-rata pada saham perusahaan average price of shares of public companies
terbuka yang diperdagangkan di Bursa Efek. traded on the Stock Exchange. Based on the
Berdasarkan metode perhitungan Volume- Volume-Weighted Average Price (VWAP)
Weighted Average Price (VWAP) selama 45 calculation method for 45 days carried out by
hari yang dilakukan oleh Emiten pada the Issuer from 04-11-2023 to 6-23-2023, the
tanggal 11-04-2023 sampai dengan tanggal Issuer has obtained a Volume-Weighted
23-6-2023, Emiten telah mendapatkan harga Average Price (VWAP) of Rp50.81.
Volume-Weighted Average Price (VWAP)
sebesar Rp50,81.
Sehubungan dengan proses persetujuan In connection with the approval process from
dari Menteri Hukum dan Hak Asasi Manusia the Minister of Law and Human Rights of the
Republik Indonesia dan pendaftaran dalam Republic of Indonesia and registration in the
Sistem Administrasi Badan Hukum Legal Entity Administration System of the
Kementerian Hukum dan Hak Asasi Manusia Ministry of Law and Human Rights of the
Republik Indonesia atas perubahan Republic of Indonesia for changes to
anggaran dasar Emiten, Emiten akan the Issuer's articles of association, the Issuer
melakukan pembulatan nilai nominal saham will round off the nominal value of shares that
yang akan tercatat dalam anggaran dasar will be recorded in the Issuer's articles of
Emiten sehingga nilai nominal dari Saham association so that the value
Hasil Konversi adalah sebesar Rp50. The nominal value of the Converted Shares
is Rp50.
d. Pelaksanaan Konversi OWK menjadi d. Implementation of OWK Conversion into
Saham Hasil Konversi Converted Shares
- 173 -
Page 171
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
(i) Emiten berhak untuk mengkonversi (i) The Issuer has the right to convert OWK
OWK menjadi Saham Hasil Konversi into Convertible Shares on
pada Tanggal Konversi, dengan tetap the Conversion Date, while still
mempertimbangkan kondisi dari Emiten. considering the conditions of the Issuer.
(ii) Dalam hal terdapat selisih antara nilai (ii) In the event that there is a difference
hasil perhitungan Volume-Weighted between the calculated value of
Average Price (VWAP) dengan nilai the Volume-Weighted Average Price
nominal Saham Hasil Konversi akibat (VWAP) and the nominal value of
dari pembulatan ke bawah atas nilai the Convertible Shares as a result of
nominal dari Saham Hasil Konversi, rounding down the nominal value of
maka Emiten akan mencatatkan selisih the Converted Shares, the Issuer will
nilai tersebut sebagai agio saham. record the difference in value as share
Sedangkan, dalam hal terdapat selisih premium. Meanwhile, in the event that
antara nilai Utang Pokok OWK yang there is a difference between the value
tidak habis dibagi dengan nilai nominal of the OWK Principal Debt which is not
Volume-Weighted Average Price divisible by the nominal value of
(VWAP) dimaksud akan diselesaikan the Volume-Weighted Average Price
Emiten kepada Pemegang OWK pada (VWAP) in question, the Issuer will settle
Tanggal Konversi OWK dengan it to the OWK Holder on the OWK
memperhatikan ketentuan peraturan Conversion Date by taking into account
perundang-undangan yang berlaku. the provisions of the applicable laws and
regulations.
(iii) Pelaksanaan konversi OWK menjadi (iii) Implementation of the conversion of
Saham Hasil Konversi dilakukan oleh OWK into Resulting Shares
Agen Konversi yang bertindak atas The conversion is carried out by the
nama Emiten, dengan memperhatikan Conversion Agent acting on behalf of the
syarat-syarat dan ketentuan-ketentuan Issuer, taking into account
yang diatur dalam Perjanjian Agen the terms and conditions stipulated in
Konversi. the Conversion Agent Agreement.
(iv) Pelaksanaan konversi OWK menjadi (iv) The conversion of OWK into Converted
Saham Hasil Konversi yang dilakukan Shares carried out by the Conversion
oleh Agen Konversi dianggap sebagai Agent is considered as repayment/
pelunasan/pembayaran jumlah Pokok payment of the Principal amount of
OWK oleh Emiten kepada Pemegang OWK by the Issuer to the OWK Holder.
OWK. Setelah Saham Hasil Konversi After the Converted Shares are received
diterima oleh para Pemegang OWK by the OWK Holders who are registered
yang terdaftar sebagai Pemegang OWK as OWK Holders on
pada Tanggal Konversi, Emiten the Conversion Date, the Issuer is
dibebaskan dari kewajiban untuk released from the obligation to make
melakukan pembayaran atas jumlah payment of the Principal amount of
Pokok OWK tersebut. the OWK.
(v) Pemegang OWK dengan ini (v) The OWK Holder hereby declares that it
menyatakan menerima setiap hasil has received every result of
pelaksanaan konversi OWK menjadi the conversion of OWK into Convertible
Saham Hasil Konversi yang dilakukan Shares carried out by the Conversion
oleh Agen Konversi dan membebaskan Agent and releases the Trustee from
Wali Amanat dari setiap klaim, tuntutan, any claims, demands and/ or civil or
dan/ atau gugatan perdata maupun criminal suits from any party including
pidana dari pihak manapun termasuk but not limited to in connection with
namun tidak terbatas sehubungan Article 5 of this.
dengan Pasal 5 ini.
4. OWK Merupakan Bukti Hutang 4. OWK is proof of debt
• Berdasarkan pernyataan Emiten sekarang • Based on the Issuer's current statement but
tetapi berlaku sejak Tanggal Emisi, OWK valid from the Issuance Date, OWK is proof
merupakan bukti bahwa Emiten secara sah that the Issuer legally and bindingly owes the
dan mengikat berhutang kepada Pemegang OWK Holder the amount of OWK Principal
OWK sejumlah Pokok OWK yang disebut stated in the Jumbo OWK Certificate plus the
dalam Sertifikat Jumbo OWK ditambah Fines (if any) which must be paid by the
dengan Denda (jika ada) yang wajib dibayar Issuer by converting it into Shares
oleh Emiten dengan cara dikonversi menjadi Conversion Results on
- 174 -
Page 172
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Saham Hasil Konversi pada Tanggal the Conversion Date, based on the OWK
Konversi, berdasarkan Perjanjian Trustee Agreement and Conversion Agent
Perwaliamanatan OWK dan Perjanjian Agen Agreement. The OWK is an important part
Konversi. OWK tersebut merupakan bagian and cannot be separated from the OWK
penting dan tidak dapat dipisahkan dari Trusteeship Agreement.
Perjanjian Perwaliamanatan OWK.
• Bukti kepemilikan OWK bagi Pemegang • Proof of OWK ownership for OWK Holders is
OWK adalah Konfirmasi Tertulis yang Written Confirmation issued by
diterbitkan oleh Pemegang Rekening dan the Account Holder and administered by
diadministrasikan oleh KSEI berdasarkan KSEI based on the Securities Account
Perjanjian Pembukaan Rekening Efek yang Opening Agreement signed by the OWK
ditandatangani Pemegang OWK dan Holder and the Account Holder. Written
Pemegang Rekening. Konfirmasi Tertulis Confirmation These cannot be transferred or
tersebut tidak dapat dialihkan atau traded.
diperdagangkan.
5. Pendaftaran OWK di KSEI 5. OWK registration at KSEI
• OWK didaftarkan pada KSEI berdasarkan • OWK is registered with KSEI based on
Perjanjian Pendaftaran OWK di KSEI yang the OWK Registration Agreement at KSEI
dibuat di bawah tangan bermaterai cukup, which is made under the hand of sufficient
dengan memperhatikan ketentuan di bidang stamp duty, taking into account provisions in
Pasar Modal dan ketentuan KSEI yang the Capital Market sector and applicable
berlaku. KSEI provisions.
• OWK diterbitkan tanpa warkat kecuali • OWK is issued without script except for
Sertifikat Jumbo OWK yang diterbitkan untuk the Jumbo OWK Certificate which is issued
didaftarkan atas nama KSEI sebagai bukti to be registered in the name of KSEI as proof
hutang untuk kepentingan Pemegang OWK of debt for the benefit of the OWK Holder
melalui Pemegang Rekening. through the Account Holder.
6. Pendaftaran OWK di KSEI 6. OWK registration at KSEI
Penarikan OWK dari Rekening Efek hanya dapat Withdrawing OWK from a Securities Account can
dilakukan dengan pemindahbukuan dari satu only be done by transferring it from one
Rekening Efek ke Rekening Efek lainnya. Securities Account to another Securities
Penarikan OWK keluar dari Rekening Efek untuk Account. Withdrawal of OWK from
dikonversikan menjadi sertifikat OWK tidak dapat the Securities Account to be converted into an
dilakukan, kecuali apabila terjadi pembatalan OWK certificate cannot be carried out, unless
pendaftaran OWK di KSEI atas permintaan there is cancellation of the OWK registration at
Emiten atau Wali Amanat dengan KSEI at the request of the Issuer or Trustee,
memperhatikan peraturan perundang-undangan taking into account the applicable laws and
yang berlaku di Pasar Modal dan keputusan regulations in the Capital Market and
RUPO. the decision of the RUPO.
7. Pengalihan OWK 7. OWK redirection
Hak kepemilikan OWK beralih dengan OWK ownership rights are transferred by
pemindahbukuan OWK dari satu Rekening Efek transferring OWK from one Securities Account to
ke Rekening Efek lainnya. Emiten, Wali Amanat another Securities Account. The Issuer, Trustee
dan KSEI memberlakukan Pemegang Rekening and KSEI treat the Account Holder as the legal
selaku Pemegang OWK yang sah dalam OWK Holder in relation to receiving rights related
hubungannya untuk menerima hak-hak yang to the OWK.
berhubungan dengan OWK.
8. Pembelian Kembali 8. Buyback
Emiten dan/atau suatu pihak ketiga dapat The issuer and/or a third party can repurchase
melakukan pembelian kembali atas OWK, baik OWK, either in part or in whole.
sebagian maupun seluruhnya.
- 175 -
Page 173
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
9. Minimum Kepemilikan OWK dan/ atau Satuan 9. Minimum OWK Ownership and/ or OWK Trading
Perdagangan OWK Unit
Minimum kepemillikan OWK adalah sebesar Rp1 Minimum OWK ownership is Rp1 or multiples
atau kelipatannya. thereof.
Sesuai keputusan Rapat Umum Pemegang In accordance with the decision of the General
Obligasi Berkelanjutan I Waskita Beton Precast Meeting of Sustainable Bondholders I Waskita
Tahap II Tahun 2019 tertanggal 15-02-2023, Beton Precast Phase II 2019 dated 15-02-2023,
Satuan Perdagangan OWK di Bursa Efek the OWK Trading Unit on the Stock Exchange is
dilakukan dengan nilai sebesar Rp5.000.000 carried out with a value of Rp5,000,000 and/ or
dan/ atau kelipatannya dan/atau dengan nilai multiples thereof and/or with a value of Rp1 and/
sebesar Rp1 dan/ atau kelipatannya, atau or multiples thereof , or with a value as
dengan nilai sebagaimana ditentukan dalam determined in the Stock Exchange regulations
peraturan Bursa Efek dan/ atau perjanjian and/ or a separate agreement signed by
tersendiri yang ditandatangani oleh Emiten dan the Issuer and the Stock Exchange.
Bursa Efek.
Sesuai peraturan/ ketentuan Bursa Efek yang In accordance with the Stock Exchange
berlaku pada saat Perjanjian Perwaliamanatan regulations/stipulations in effect at the time this
OWK ini ditandatangani, yaitu sesuai Surat OWK Trusteeship Agreement was signed,
Edaran Bursa Efek Indonesia Nomor SE- namely in accordance with the Indonesian Stock
00016/BEI/07-2021 tanggal 12-07-2021 perihal Exchange Circular Letter Number SE-
Parameter Perdagangan Efek Bersifat Utang dan 00016/BEI/07-2021 dated 07-12-2021 regarding
Sukuk di Sistem Penyelenggara Pasar Alternatif Trading Parameters for Debt Securities and
(SPPA), diatur antara lain parameter satuan Sukuk in the Organizer's System Alternative
perdagangan di papan retail corporate bonds Market (SPPA), regulated among other things,
(retail corps) sebesar Rp1.000.000, maka trading unit parameters on the retail corporate
Satuan Perdagangan OWK di Bursa Efek bonds (retail corps) board at Rp1,000,000, then
dilakukan dengan nilai sebesar Rp1.000.000 the OWK Trading Unit on the Stock Exchange is
dan/ atau kelipatannya. carried out with a value of Rp1,000,000 and/ or
multiples thereof.
Apabila ketentuan mengenai satuan perdagangan If the provisions regarding trading units on
di bursa efek ditentukan lain oleh peraturan the stock exchange are determined differently by
perundang-undangan dibidang pasar modal, statutory regulations in the capital market sector,
maka peraturan perundang-undangan dibidang then the statutory regulations in
pasar modal tersebut yang berlaku. Perdagangan the capital market sector shall apply. OWK
OWK dilakukan di Bursa Efek dengan syarat- trading is carried out on the Stock Exchange with
syarat dan ketentuan sebagaimana ditentukan the terms and conditions as specified in
dalam peraturan Bursa Efek. the Stock Exchange regulations.
10. Jaminan dan Hak Senioritas Atas Utang 10. Collateral and Seniority Rights on Debt
OWK tidak dijamin dengan jaminan khusus, OWK is not guaranteed by special guarantees,
sebagaimana dimaksud dalam Perjanjian as intended in the OWK Trustee Agreement.
Perwaliamanatan OWK. Pemegang OWK tidak OWK Holders do not have the right to take
mempunyai hak untuk didahulukan dan hak precedence and the rights of OWK Holders are
Pemegang OWK adalah paripassu tanpa hak paripassu without preferential rights with
preferen dengan hak-hak kreditur Emiten the rights of other Issuer creditors, both those
lainnya, baik yang ada sekarang maupun yang existing now and those that will exist in
akan ada di kemudian hari, kecuali hak-hak the future, except for the rights of the Issuer's
kreditur Emiten yang dijamin secara khusus creditors which are specifically guaranteed by the
dengan kekayaan Emiten baik yang telah ada Issuer's assets either existing or future ones as
maupun yang akan ada sebagaimana ditentukan determined in the OWK Trusteeship Agreement.
dalam Perjanjian Perwaliamanatan OWK.
11. Sanksi 11. Punishment
Apabila Emiten tidak memenuhi kewajiban dalam If the Issuer does not fulfill the obligations in
Perjanjian Perwaliamanatan OWK maka Emiten the OWK Trustee Agreement, especially the
dapat dikenakan sanksi sesuai dengan OWK Trustee Agreement, the Issuer may be
Perjanjian Perwaliamanatan OWK antara lain subject to sanctions in accordance with the OWK
- 176 -
Page 174
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
apabila Emiten tidak melakukan konversi OWK Trustee Agreement, including if the Issuer does
menjadi Saham Hasil Konversi pada Tanggal not convert the OWK into Converted Shares on
Konversi, maka Emiten wajib membayar Denda. the Conversion Date, then the Issuer is obliged
Denda yang dibayar oleh Emiten merupakan hak to pay a Fine. Fines paid by the Issuer are the
Pemegang OWK, yang akan diberikan kepada rights of the OWK Holder, which will be given to
Pemegang OWK secara proporsional the OWK Holder proportionally based on the size
berdasarkan besarnya OWK yang dimilikinya. of the OWK they own.
Lain-lain Others
a. Kewajiban Emiten berdasarkan OWK pada a. The Issuer's obligations under the OWK at
setiap waktu merupakan kewajiban Emiten any time constitute the Issuer's legal
yang sah dan yang tidak bersyarat serta obligations and are unconditional and
bersifat mutlak. absolute.
b. Konversi Pokok OWK menjadi Saham Hasil b. Conversion of OWK Principal into
Konversi dan pembayaran Denda (jika ada) Conversion Shares and payment of Fines (if
merupakan hak dari para Pemegang OWK. any) are the rights of OWK Holders.
c. Bank Kustodian atau Perusahaan Efek yang c. Custodian Banks or Securities Companies
merupakan Pemegang Rekening dapat which are Account Holders can act for
bertindak untuk dirinya sendiri atau themselves or based on a power of attorney
berdasarkan surat kuasa bertindak untuk to act for and on behalf of their customers as
dan atas nama nasabahnya sebagai OWK Holders.
Pemegang OWK.
d. Bank Kustodian atau Perusahaan Efek yang d. A Custodian Bank or Securities Company
merupakan Pemegang Rekening dapat which is an Account Holder can act for itself
bertindak untuk dirinya sendiri atau or based on a power of attorney to act for and
berdasarkan surat kuasa bertindak untuk on behalf of its customers as an OWK
dan atas nama nasabahnya sebagai Holder. For OWK Holders, tax provisions
Pemegang OWK. Bagi Pemegang OWK apply in accordance with the laws and
berlaku ketentuan perpajakan sesuai regulations in force in the Republic of
dengan peraturan perundang-undangan Indonesia and if the Issuer is required by the
yang berlaku di Negara Republik Indonesia laws and regulations in force in the Republic
dan apabila Emiten diwajibkan oleh of Indonesia to withhold tax on every
peraturan perundang-undangan yang payment made by the Issuer to OWK
berlaku di Negara Republik Indonesia untuk Holders, the Issuer through the Agent
memotong pajak atas setiap pembayaran Payments must withhold the tax and pay it to
yang dilakukan oleh Emiten kepada the agency appointed to receive tax
Pemegang OWK, Emiten melalui Agen payments and through the Payment Agent
Pembayaran harus memotong pajak will provide proof of tax withholding to the
tersebut dan membayarkannya kepada OWK Holder.
instansi yang ditunjuk untuk menerima
pembayaran pajak serta melalui Agen
Pembayaran akan memberikan bukti
pemotongan pajak kepada Pemegang OWK.
Berdasarkan surat dari PT Pefindo nomor RC- Based on a letter from PT Pefindo number RC-
794/PEF-DIR/IX/2023 tanggal 11 September 2023 794/PEF-DIR/IX/2023 dated September 11 2023
perihal Sertifikat Pemeringkat atas Obligasi dan regarding Rating Certificates for WBP Bonds and
Obligasi Wajib Konversi WBP, peringkat Obligasi Mandatory Convertible Bonds, ratings of Waskita
Waskita Beton Precast I Tahun 2022, Obligasi Wajib Beton Precast Bonds I of 2022, Waskita Beton
Konversi Waskita Beton Precast I Tahun 2023 serta, Precast Mandatory Convertible Bonds I of 2023 as
Obligasi Waskita Beton Precast II Tahun 2022 dan well as, Waskita Beton Precast II Bonds of 2022 and
Obligasi Wajib Konversi Waskita Beton Precast II Waskita Beton Precast II Mandatory Convertible
Tahun 2023 adalah B (Single B). Bonds of 2023 are B (Single B).
39. LIABILITAS IMBALAN KERJA 39. EMPLOYEE BENEFIT LIABILITIES
Rincian kewajiban imbalan pasca kerja sesuai UU Details of post-employment benefit obligations in
Republik Indonesia No. 11/2020 Tentang Cipta Kerja accordance with Law of the Republic of Indonesia
dan kewajiban manfaat jangka panjang lainnya No. 11/2020 concerning Job Creation and other
berdasarkan entitas yang disajikan dalam laporan long-term benefit obligations based on entities
keuangan konsolidasian adalah sebagai berikut: presented in the consolidated financial statements
are as follows:
- 177 -
Page 175
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Perusahaan/ the Company 15.944.902.982 15.944.902.982
Entitas Anak/ Subsidiaries
PT Waskita Beton Precast Tbk 30.895.817.845 31.042.785.396
PT Trans Jabar Tol 3.367.903.101 3.367.903.101
PT Waskita Toll Road 744.490.332 4.112.393.433
PT Waskita Karya Realty 2.074.163.484 2.074.163.484
Jumlah/ Total 53.027.277.744 56.542.148.396
Program Pensiun Iuran Pasti Defined Benefit Plans
Perusahaan menyelenggarakan program pensiun The Company provides a defined benefit and other
imbalan pasti dan imbalan kerja jangka panjang lainnya long-terms benefit covering all the qualified
untuk semua karyawan yang memenuhi persyaratan. employees.
Nilai kewajiban yang termasuk dalam laporan posisi The amount of liabilities included in the consolidated
keuangan konsolidasian dari manfaat pasca-kerja di statements of financial position arising from post
bawah UU Cipta Kerja No. 11/2020 dan kewajiban employment benefits under Job Creation No. 11 of
manfaat jangka panjang lainnya (cuti besar dan 2020 and other long-term benefit (long leave and
pegawai kontrak) adalah sebagai berikut: contract employees) are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Imbalan pascakerja sesuai Post-employment benefits under
UU Ketenagakerjaan No.13/2003 21.562.409.148 25.077.279.800 Labor Law No. 13/2003
Manfaat jangka panjang lainnya 31.464.868.596 31.464.868.596 Other long-term benefit
Nilai Kini Kewajiban Imbalan Kerja - Akhir 53.027.277.744 56.542.148.396 Present Value Benefit Obligation - Ending
Dana pensiun ini dikelola oleh PT Asuransi Jiwasraya The pension plan is managed by PT Asuransi
(Persero) yang akta pendiriannya telah disahkan oleh Jiwasraya (Persero), the deed of establishment of
Menteri Keuangan Republik Indonesia dengan KEP- which was approved by the Minister of Finance of
84/MK/IV/2/1973 tanggal 28 Februari 1973. Pada the Republic of Indonesia in his decision letter
tahun 2006, Perusahaan menandatangani perjanjian KEP-84/MK/IV/2/1973 dated February 28, 1973. In
kerja sama No. WK: L.20/P/WK/2006 dan No. AJS: 2006, the Company signed a cooperation agreement
079.SJ.U. 076 tanggal 28 Juli 2006 tentang No. WK:L.20/P/WK/2006 and No. AJS:079.SJ.U.076
Pengelolaan Program Asuransi Pesangon Kumpulan dated July 28, 2006 concerning to Management of
dan Addendum I Perjanjian Kerjasama Severance Group Insurance Program and Addendum
No. L.20/P/WK/2006; No. 079 SJ. U. 0706 tanggal 25 I to Cooperation Agreement No. L.20/P/WK/2006;
April 2008. No. 079 SJ. U. 0706 dated April 25, 2008.
a. Program Imbalan Pasca Kerja a. Post-employment Benefit Plan
Imbalan kerja memberikan eksposur Employee benefit typically exposes the Company
Perusahaan terhadap risiko aktuarial seperti to actuarial risks such as investment risk, interest
risiko investasi, risiko tingkat bunga, risiko rate risk, longevity risk and salary risk.
harapan hidup dan risiko gaji.
Risko investasi Investment risk
Nilai kini kewajiban imbalan pasti dihitung The present value of the defined benefit plan
menggunakan tingkat diskonto yang ditetapkan liability is calculated using a discount rate
dengan mengacu pada imbal hasil obligasi determined by reference to high quality corporate
korporasi berkualitas tinggi; jika pengembalian aset bond yields; if the return on plan asset is below
program di bawah tingkat tersebut, hal itu akan this rate, it will create a plan deficit. Currently, the
mengakibatkan defisit program. Saat ini program plan has a relatively balanced investment in
tersebut memiliki investasi yang relatif seimbang equity securities, debt instruments and real
pada efek ekuitas, instrumen utang dan real estate. estates. Due to the long-term nature of the plan
Karena sifat jangka panjang dari liabilitas program, liabilities, the board of the pension fund considers
dewan dana pensiun perlu menetapkan bahwa it appropriate that a reasonable portion of the
bagian wajar dari aset program harus plan assets should be invested in equity
diinvestasikan pada efek ekuitas dan real estate securities and in real estate to leverage the return
untuk meningkatkan imbal hasil yang dihasilkan generated by the fund.
oleh dana.
- 178 -
Page 176
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Risiko Tingkat Bunga Interest Rate
Penurunan suku bunga obligasi akan A decrease in the bond interest rate will increase
meningkatkan liabilitas program; namun, the plan liability; however, this will be partially
sebagian akan saling hapus oleh peningkatan offset by an increase in the return on the plan’s
imbal hasil atas investasi instrumen utang. debt investments.
Risiko Harapan Hidup Longevity risk
Nilai kini kewajiban imbalan pasti dihitung The present value of the defined benefit plan
dengan mengacu pada estimasi terbaik dari liability is calculated by reference to the best
mortalitas peserta program baik selama dan estimate of the mortality of plan participants both
setelah kontrak kerja. Peningkatan harapan during and after their employment. An increase in
hidup peserta program akan meningkatkan the life expectancy of the plan participants will
liabilitas program. increase the plan’s liability.
Risiko Gaji Salary risk
Nilai kini kewajiban imbalan pasti dihitung The present value of the defined benefit plan
dengan mengacu pada gaji masa depan peserta liability is calculated by reference to the future
program. Dengan demikian, kenaikan gaji salaries of plan participants. As such, an increase
peserta program akan meningkatkan liabilitas in the salary of the plan participants will increase
program itu. the plan’s liability.
Perusahaan menyelenggarakan program The Company established defined benefit pension
pensiun imbalan pasti mencakup semua plan covering all the local permanent employees.
karyawan tetap lokal dan pegawai kontrak. This plan provides pension benefits based on years
Program ini memberikan imbalan pensiun of service and salaries of the employees and
berdasarkan penghasilan dasar pensiun dan contract employees. The Company has recorded
masa kerja karyawan. Perusahaan telah liabilities of employee benefits in accordance with
membukukan liabilitas manfaat karyawan sesuai Law No. 11 Year 2020 concerning Job Creation
dengan Undang – Undang No. 11 Tahun 2020 regarding to pertaining to man power, using
tentang Cipta Kerja, menggunakan teknik actuarial techniques, within the framework of
aktuarial, dalam rangka penerapan PSAK No. 24 the implementation of Indonesian PSAK No. 24 of
tentang Imbalan Kerja. Employee Benefits.
Liabilitas imbalan pasca-kerja Perusahaan The amounts included in the statement of
sehubungan dengan program pensiun yang financial position arising from the Company’s
termasuk dalam laporan posisi keuangan obligation in respect of the defined benefits plan
konsolidasian adalah sebagai berikut: is as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Nilai Kini Kewajiban 206.778.502.999 206.778.502.999 Present Value of Obligations
Nilai Wajar Aset Program (202.139.834.475) (202.139.834.475) Fair Value of Plan Assets
Dampak Pembatasan Aset 20.478.759.955 20.478.759.955 Impact of Asset Restriction
Liabilitas Bersih yang Timbul Net Liability Arising from
dari Kewajiban Imbalan Pasti 25.117.428.479 25.117.428.479 Defined Benefits Obligation
Mutasi nilai kini liabilitas imbalan pasti adalah Movements in the present value of the defined
sebagai berikut: benefit liabilities were as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Saldo Awal Nilai Kini Liabilitas 260.017.384.166 260.017.384.166 Beginning Balance
Biaya Jasa Kini 23.451.142.230 23.451.142.230 Current Service Cost
Biaya Bunga 18.335.437.950 18.335.437.950 Interest Cost
(Keuntungan) Kerugian Kurtailment 172.136.509 172.136.509 (Gain) Loss from Curtailment
Imbalan yang Dibayarkan (106.848.175.807) (106.848.175.807) Benefits Payment
Pengukuran Kembali Liabilitas (Aset) Remeasurement on the Net Defined
Imbalan Pasti Neto: Benefit (Asset) Liability:
Biaya jasa lalu yang telah diakui 12.648.502.434 12.648.502.434 Recognized service costs
(Keuntungan) Kerugian Aktuarial yang Actuarial (Gains)/Losses Arising
Timbul dari Penyesuaian Pengalaman (997.924.483) (997.924.483) from Experience Adjustment
Saldo Akhir Nilai Kini Liabilitas 206.778.502.999 206.778.502.999 Ending Balance of Present Value Obligation
- 179 -
Page 177
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Mutasi nilai wajar dari aset program adalah Movements in the fair value of the plan assets
sebagai berikut: were as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Nilai wajar aset program- awal 315.211.030.360 315.211.030.360 Opening fair value of plan assets
Pengukuran kembali keuntungan (kerugian): Remeasurement gain (loss):
Imbal hasil aset program (tidak termasuk jumlah Return
Return on
on plan
plan assets
assets (excluding
(excluding amounts
amounts
yang dimasukkan dalam beban bunga neto) 23.325.616.246 23.325.616.246 included in net interest expense)
(Kerugian) Aktuarial atas Aset Program (136.396.812.131) (136.396.812.131) Actuarial (Loss) on Assets Programs
Nilai Wajar Aset Program - Akhir 202.139.834.475 202.139.834.475 Closing Fair Value of Plan Assets - Ending
Asumsi aktuarial yang signifikan untuk Significant actuarial assumptions for
penentuan kewajiban imbalan pasti adalah the determination of the defined obligation are
tingkat diskonto, kenaikan gaji yang diharapkan discount rates expected salary increase and
dan mortalitas. Sensitivitas analisis di bawah ini mortality. The sensitivity analysis below have
ditentukan berdasarkan masing-masing been determined based on reasonably possible
perubahan asumsi yang mungkin terjadi pada changes of the respective assumptions occurring
akhir periode pelaporan, dengan semua asumsi at the end of the reporting period, while holding
lain konstan. all other assumptions constant.
Berikut adalah analisa sensitivitas atas asumsi The followings is the sensitivity analysis of
signifikan yang mempengaruhi nilai kini significant assumptions that affect the present
kewajiban dan biaya jasa kini: value of obligations and current service costs:
Nilai Kini Kewajiban/
Present Value of Biaya Jasa Kini/
Obligation Current Service Cost
31 Desember/ December 31, 2023:
Perubahan Tingkat Diskonto/
Changes in Discounted Rate
Naik Menjadi/ Increase to 7,80% 170.164.916.604 17.139.347.131
Tingkat Diskonto/ Discounted Rate 6,80% 181.661.074.520 19.008.837.132
Turun Menjadi/ Decrease to 5,80% 194.789.641.021 21.222.017.425
Perubahan Tingkat Kenaikan Upah/
Changes in Wages Rate
Naik Menjadi/ Increase to 6,00% 194.153.010.141 21.155.185.282
Tingkat Kenaikan Upah/ Wages Increase Rate 5,00% 181.661.074.520 19.008.837.132
Turun Menjadi/ Decrease to 4,00 % 170.524.674.842 17.160.151.711
Durasi rata-rata dari kewajiban imbalan pada 31 The average duration of the benefit obligation at
Maret 2024 dan 31 Desember 2023 adalah 18,02 March 31, 2024 and December 31, 2023 is 18.02
Tahun. years.
b. Manfaat Jangka Panjang Lainnya b. Other Long-term Benefits
Perusahaan juga menyediakan manfaat cuti The Company also provides long service leaves
besar untuk karyawan yang telah bekerja selama to the employee who have already rendered 6
6 tahun dalam bentuk satu kali gaji dan years of service in the form of cash amounting to
kewajiban manfaat pegawai kontrak. one month salary and contract employee benefit
obligations.
Mutasi nilai kini manfaat jangka panjang lainnya Movements in the present value of other long-
adalah sebagai berikut: term benefits were as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Saldo Awal Nilai Kewajiban Manfaat Beginning Balance Long-Term
Jangka Panjang Lainnya 17.679.875.404 17.679.875.404 Benefits Obligation
Biaya Jasa Kini 1.651.929.566 1.651.929.566 Current Service Cost
Biaya Bunga 1.294.509.554 1.294.509.554 Interest Cost
Imbalan Kerja yang Sudah Tercatat Recorded Employee Benefits
Bagi Pegawai Keluar (14.148.375.564) (14.148.375.564) for Outgoing Employees
(Keuntungan) Kerugian Kurtailmen 8.476.378.401 8.476.378.401 (Gain) Loss from Curtailment
Saldo Akhir Nilai Kewajiban Ending Balance Long-Term
Manfaat Jangka Panjang 14.954.317.361 14.954.317.361 Benefits Obligation
- 180 -
Page 178
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Perhitungan imbalan pasca-kerja dan manfaat Calculation of post-employment benefits and
jangka panjang lainnya (cuti besar dan pegawai other long-term benefits (long leave and contract
kontrak) dihitung oleh aktuaris independen employees), is calculated by independent
Kantor Konsultan Aktuarial Nandi dan Sutama. actuary Kantor Konsultan Aktuarial Nandi dan
Asumsi akuarial pada tanggal 31 Maret 2024 dan Sutama. Actuarial assumptions as of and for the
31 Desember 2023 sebagai berikut: year ended March 31, 2024 and December 31,
2023 are as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Tingkat Diskonto 6,8% dan 6,25% 6,8% dan 6,25% Discount Rate
Tingkat Kenaikan Gaji 5,00% 5,00% Annual Salary Increasing Rate
Tingkat Mortalitas TMI IV 2019 TMI IV 2019 Mortality Rate
Tingkat Cacat 5,00% of TMI IV 2019 5,00% of TMI IV 2019 Disability Rate
Umur Pensiun Normal (tahun) 55 55 Normal Retirement Age (years)
40. MODAL SAHAM 40. SHARE CAPITAL
a. Modal Saham a. Share Capital
Sesuai daftar pemegang saham yang According to the shareholders list from Biro
dikeluarkan oleh Biro Administrasi Efek (BAE), Adminstrasi Efek (BAE), PT Datindo Entrycom,
PT Datindo Entrycom, susunan pemegang the composition of the Company’s capital were
saham Perusahaan adalah sebagai berikut: as follows:
31 Maret/ March 31, 2024
31 Desember/ December 31, 2023
Persentase Jumlah Modal
Kepemilikan/ Disetor/
Jumlah Saham/ Percentage of Total Paid In
Total Shares Ownership Capital
Modal Dasar 54.295.804.000 5.429.580.400.000 Authorized Capital
Modal Ditempatkan dan Disetor Penuh: Subscribed and Fully Paid Capital:
Saham Preferen (Seri A Dwi Warna) Preferred Stock (Dwi Warna Serie A)
Pemerintah Republik Indonesia 1 0,00% 100 Government of Republic of Indonesia
Saham Biasa (Seri B) Common Stock (Serie B)
Pemerintah Republik Indonesia 21.705.633.361 75,35% 2.170.563.336.100 Government of Republic of Indonesia
Masyarakat (kepemilikan <0,5%) 7.101.173.654 24,65% 710.117.365.400 Public (each holding <0.5%)
Jumlah Modal Ditempatkan Total Issued
dan Disetor Penuh 28.806.807.016 100,00% 2.880.680.701.600 and Fully Paid
Dibawah ini merupakan Akta Notaris terkait Below are the Notarial Deed related to share
modal saham: capital:
• Berdasarkan Peraturan Pemerintah No. 40 • According to Government Regulation
tahun 1970 status Perusahaan berubah dari No. 40 year 1970, the Company’s status was
Perusahaan Negara (PN) menjadi Perseroan changed from State Enterprise into
(Persero). Selanjutnya, Perusahaan Perseroan (Persero). Furthermore,
dinamakan PT Waskita Karya (Persero) the Company was named as
berdasarkan Akta Perseroan Terbatas No. PT Waskita Karya (Persero) in accordance
80 tanggal 15 Maret 1973, yang dibuat di with the Deed of Limited Liability Corporation
hadapan Kartini Mulyadi, S.H., Notaris di No. 80 dated March 15, 1973 of Kartini
Jakarta. Akta Perseroan Terbatas tersebut Mulyadi, S.H., Notary in Jakarta.
telah disahkan oleh Menteri Kehakiman pada The deed was approved by the Minister of
tanggal 20 Agustus 1973 dengan Surat Law on August 20, 1973 in his Decree
Keputusan No. 4.a.5/310/3 serta diumumkan No. 4.a.5/310/3 and stated on State Gazette
dalam Berita Negara Republik Indonesia of Republic of Indonesia No. 82 on
No. 82 tanggal 13 November 1973, November 13, 1973, Supplement No. 91.
Tambahan Berita Negara No. 91.
• Pada tanggal 10 Desember 2012, • On December 10, 2012, the Company’s
Perusahaan memperoleh pernyataan efektif obtained an effective statement from
dari Ketua Badan Pengawas Pasar Modal the Chairman of the Capital Market and
dan Lembaga Keuangan (Bapepam-LK) Financial Institution Supervisory Agency
berdasarkan surat keputusan No. S- (Bapepam-LK) through the decision letter
14012/BL/2012. Pada tanggal 17 Desember No. S-14012/ BL/2012. On December 17,
2012 berdasarkan surat No. S- 2012, according to letter
- 181 -
Page 179
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
08414/BEI.PPJ/12-2012 Bursa Efek No. S-08414/BEI.PPJ/12-2012, Indonesian
Indonesia (BEI) menyetujui penawaran efek Stock Exchange (IDX) agreed to the public
Perusahaan di BEI kepada masyarakat atas offering of the Company on IDX for
3.082.315.000 saham biasa dengan nilai 3,082,315,000 of common stock with the par
nominal Rp100 per saham dan harga value Rp100 per share and the offering price
penawaran Rp380 per saham. Rp380 per share.
▪ ▪
• Sesuai dengan Akta No. 19 tahun 2018 • Based on the Deed No. 19 of 2018 dated
tanggal 6 April 2018 tentang perubahan April 6, 2018 regarding the Amendment of
peningkatan modal ditempatkan/ disetor the Issuance of paid-up capital of article 4
pasal 4 ayat 3 yang telah disetujui oleh paragraph 3 which has been approved by
Menteri Hukum dan Hak Asasi Manusia the Minister of Law and Human Rights in
dengan Surat Keputusan No. AHU- Decision Letter No. AHU-AH.01.03-
AH.01.03-0137350 Tahun 2018 tanggal 6 0137350 Year 2018 date April 6, 2018
April 2018 menerangkan bahwa dengan explains that with the implementation of
adanya pelaksanaan MESOP sebanyak MESOP 24,200 (Twenty Four Thousand
24.200 (Dua Puluh Empat Ribu Dua Ratus) Two Hundred) of Series B shares each with
saham seri B masing-masing saham dengan nominal value of Rp100 (one hundred
nilai nominal sebesar Rp100 (seratus Rupiah) or with a total nominal value of
Rupiah) atau dengan jumlah nilai Rp2,420,000 (two million four hundred and
nominal sebesar Rp2.420.000 (dua juta twenty thousand Rupiah), the total issued
empat ratus dua puluh ribu rupiah) maka and paid up capital of the Company
jumlah modal ditempatkan dan disetor increased from Rp13,573,878,400 (thirteen
Perseroan meningkat dari billion five hundred seventy three million
Rp13.573.878.400 (tiga belas milyar lima eight hundred seventy eight thousand four
ratus tujuh puluh tiga juta delapan ratus tujuh hundred) shares to Rp13,573,902,600
puluh delapan ribu empat ratus) saham (thirteen billion five hundred seventy three
menjadi Rp13.573.902.600 (tiga belas milyar million nine hundred two thousand and six
lima ratus tujuh puluh tiga juta sembilan ratus hundred) shares.
dua ribu enam ratus) saham.
▪ ▪
• Sesuai dengan Akta No. 9 tahun 2019 • Based on the Deed No. 9 of 2019 dated
tanggal 8 Januari 2019 tentang perubahan January 8, 2019 regarding the Amendment
peningkatan modal ditempatkan/ disetor of the Issuance of Paid-up Capital of Article
pasal 4 ayat 2 dan 3 yang telah disetujui oleh 4 paragraph 2 and 3 which has been
Menteri Hukum dan Hak Asasi Manusia approved by the Minister of Law and Human
dengan Surat Keputusan No. AHU- Rights in Decision Letter No. AHU-AH.01.03-
AH.01.03-0010978 tanggal 9 Januari 2019 0010978 dated January 9, 2019 explains
menerangkan bahwa dengan adanya that with the implementation of MESOP
pelaksanaan MESOP sebanyak 48.400 48,400 (Fourty Eight Thousand Four
(Empat Puluh Delapan Ribu Empat Ratus) Hundred) of Series B shares each with
saham seri B masing-masing saham dengan nominal value of Rp100.00 (one hundred
nilai nominal sebesar Rp100,00 (seratus Rupiah) or with a total nominal value of
Rupiah) atau dengan jumlah nilai nominal Rp4,840,000.00 (four million eight hundred
sebesar Rp4.840.000,00 (empat juta and fourty thousand Rupiah), the total issued
delapan ratus empat puluh ribu rupiah) maka and paid up capital of the Company
jumlah modal ditempatkan dan disetor increased from 13,573,902,600 (thirteen
Perseroan meningkat dari 13.573.902.600 billion five hundred seventy three million nine
(tiga belas milyar lima ratus tujuh puluh tiga hundred two thousand and six hundred)
juta sembilan ratus dua ribu enam ratus) shares to 13,573,951,000 (thirteen billion
saham menjadi 13.573.951.000 (tiga belas five hundred seventy three million nine
milyar lima ratus tujuh puluh tiga juta hundred fifty one thousand) shares.
sembilan ratus lima puluh satu ribu) saham.
• Berdasarkan Akta No. 11 tahun 2021 tanggal • Based on the Deed No. 11 of 2021 dated
7 Oktober 2021 tentang perubahan October 7, 2021 regarding changes to
peningkatan Modal Dasar Perusahaan pasal the increase in the Company's Authorized
4 ayat 1 yang telah disetujui oleh Menteri Capital Article 4 paragraph 1 which has been
Hukum dan Hak Asasi Manusia dengan approved by the Minister of Law and Human
Surat Keputusan No. AHU- Rights with Decree No. AHU-
0056001.AH.01.02 tanggal 11 Oktober 0056001.AH.01.02 dated October 11, 2021,
2021 menyetujui peningkatan Modal approved an increase in the Company's
Dasar Perseroan semula 26.000.000.000 Authorized Capital from 26,000,000,000
- 182 -
Page 180
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
lembar saham atau setara shares or equal to Rp 2,600,000,000,000 to
dengan Rp2.600.000.000.000 menjadi 54,295,804,000 shares or equal to
54.295.804.000 lembar saham terdiri dari 1 Rp5,429,580,400,00 shares consist of 1
lembar saham seri A Dwiwarna dan Dwiwarna series A share and
54.295.803.999 lembar saham seri B dengan 54,295,803,999 series B shares with a
nilai nominal Rp100 per lembar saham atau nominal value of Rp100 per share or
setara dengan Rp5.429.580.400.000. the equivalent of IDR 5,429,580,400,000.
• Anggaran Dasar Perusahaan telah beberapa • The Company’s Articles of Association has
kali mengalami perubahan, terakhir been amended several times, most recently
berdasarkan akta notaris No. 6 tanggal 21 by notarial deed No. 6 dated January 21,
Januari 2022 yang dibuat dihadapan Notaris 2022 by Notary Ashoya Ratam, S.H., M.Kn.,
Ashoya Ratam, S.H., M.Kn., di Jakarta, yang in Jakarta, which has obtained Approval for
telah mendapatkan Persetujuan Perubahan Amendment to the Company's Articles of
Anggaran Dasar Perseroan No. AHU- Association No. AHU- 0014815.AH.01.11
0014815.AH.01.11 tanggal 21 Januari 2022 dated January 21, 2022 and Acceptance of
dan Penerimaan Pemberitahuan Perubahan Notification of Amendment to the Articles of
Anggaran Dasar dari Kementerian Hukum Association from the Ministry of Law and
dan Hak Asasi Manusia Republik Indonesia Human Rights of the Republic of Indonesia
No. AHU-AH.01.03-0048528 tanggal 22 No. AHU-AH.01.03-0048528 dated January
Januari 2022. Anggaran Dasar Perusahaan 22, 2022. The Company's Articles of
mengalami perubahan terkait pasal 4 ayat 2 Association have been amended related to
dan 3 tentang persetujuan pemegang saham article 4 paragraphs 2 and 3 regarding
Perseroan untuk meningkatkan modal approval of the Company's shareholders to
ditempatkan dan disetor sejumlah sejumlah increase the issued and paid-up capital by
2.490.920.541 saham baru seri B yang 2,490,920,541 new series B shares which
merupakan saham baru hasil pelaksanaan are new shares resulted from the exercise of
Hak Memesan Efek Terlebih Dahulu, Pre-emptive Rights, so that the new issued
sehingga modal ditempatkan dan disetor dari and paid-up capital of the original amounting
yang semula sebesar Rp2.631.588.647.500 to Rp2,631,588,647,500 which is divided into
yang terbagi atas 26.315.886.475 lembar 26,315,886,475 shares consisting of 1
saham yang terdiri dari 1 saham Seri A Series A Dwiwarna share or equivalent to
Dwiwarna atau setara dengan Rp100 dan Rp100 and 26,315,886.474 Series B shares
26.315.886.474 saham Seri B atau setara or equivalent to Rp2,631,588,647,400 to
dengan Rp2.631.588.647.400 menjadi Rp2,880,680,701,600 which is divided into
sebesar Rp2.880.680.701.600 yang terbagi 28,806,807,016 shares consisting of 1
atas 28.806.807.016 lembar saham yang Dwiwarna Series A share or equivalent to
terdiri dari 1 saham Seri A Dwiwarna atau Rp100 and 28,806,807,015 Series B shares
setara dengan Rp100 dan 28.806.807.015 or equivalent to Rp2,880,680,701,500.
saham Seri B atau setara dengan
Rp2.880.680.701.500.
41. TAMBAHAN MODAL DISETOR 41. ADDITIONAL PAID-IN CAPITAL
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Agio Saham Premium on Share
Tambahan modal disetor dari penawaran umum saham Additional paid-in capital of a public offering
Perusahaan kepada masyarakat sebesar 3.082.315.000 of shares to the public at 3,082,315,000 shares
saham dengan nilai nominal Rp 100 per saham, yang with a nominal value of Rp 100 per share,
ditawarkan Rp 380 per saham 863.048.200.000 863.048.200.000 which offered Rp 380 per share
Tambahan modal disetor dari eksekusi opsi saham karyawan 118.826.375.828 118.826.375.828 Additional paid-in capital from the exercise of employee stock options
Tambahan modal disetor dari Penawaran Umum Terbatas I (PUT I) Additional paid-in capital of a Limited Public Offering (LOP I)
Perusahaan kepada masyarakat sebesar 3.653.498.200 saham dengan of shares to the public at 3,653,498,200 shares with
nilai nominal Rp 100 per saham, yang ditawarkan Rp 1.450 per saham 4.969.551.418.508 4.969.551.418.508 par value Rp 100 per share, offered Rp 1,450 per share
Tambahan modal disetor dari Hak Memesan Efek Terlebih Dahulu Additional paid-in capital of a Pre-Emptive Right share and paid up
bagian dan disetor Negara Republik Indonesia sebesar 12.741.935.475 saham by the Republic of Indonesia amounted to 12,741,935,475 shares
dengan nilai nominal Rp 100 per saham, yang ditawarkan Rp 620 per saham 6.625.806.447.000 6.625.806.447.000 par value Rp 100 per share, offered Rp 620 per share
Tambahan modal disetor dari Hak Memesan Efek Terlebih Dahulu Additional paid-in capital of a Pre-Emptive Right share and paid up
bagian dan disetor Masyarakat sebesar 2.490.920.541 saham by the Republic of Indonesia amounted to 2,490,920,541 shares
dengan nilai nominal Rp 100 per saham, yang ditawarkan Rp 620 per saham 1.295.278.681.320 1.295.278.681.320 par value Rp 100 per share, offered Rp 620 per share
Dikurangi dengan biaya emisi saham (31.910.365.455) (31.910.365.455) Less: Share Issuance Cost
Dikurangi dengan biaya emisi saham penawaran umum terbatas (54.741.313.477) (54.741.313.477) Less: Share Issuance Cost on Limited Public Offering
Penyesuaian atas Perubahan Kepemilikan Adjustment for Changing Ownership
atas Entitas Anak (143.262.366.168) (219.945.216.939) in Subsidiaries
Saldo Tambahan modal disetor 13.642.597.077.556 13.565.914.226.7850 Total Paid In Capital
- 183 -
Page 181
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Tambahan modal disetor - agio saham merupakan Additional paid in capital - premium on share
agio saham yang berasal dari penawaran umum represent share premium resulting from public
saham Perusahaan setelah dikurangi dengan biaya offering by the Company net off share issuance cost.
emisi saham.
Biaya emisi efek ekuitas merupakan biaya yang Share issuance costs are payments related to
berkaitan dengan penerbitan efek ekuitas the issuance of Company’s equity securities. These
Perusahaan. Biaya ini mencakup fee dan komisi yang costs include fees and commissions paid to
dibayarkan kepada penjamin emisi, lembaga dan the underwriter, supporting institutions and
profesi penunjang pasar modal, dan biaya professionals in capital markets, and the registration
pencetakan dokumen pernyataan pendaftaran, biaya document printing costs, cost of equity securities listing
pencatatan efek ekuitas dibursa efek, serta biaya on the stock exchange, as well as promotional cost in
promosi sesuai dengan Keputusan Ketua Badan accordance with the Decision of
Pasar Modal No. Kep-97/PM/1996 tanggal 28 Mei the Chairman of the Capital Market Board No. Kep-
1996 yang diubah dengan Kep-06/PM/2000 tanggal 97/PM/1996 dated May 28, 1996 as amended by Kep-
13 Maret 2000, peraturan No. VIII.G.7 tentang 06/PM/2000 dated March 13, 2000, regulation No.
Pedoman Penyajian Laporan Keuangan Bab Ekuitas VIII.G.7 of Guidelines for the Preparation of Financial
pasal Tambahan Modal Disetor. Biaya Emisi Efek Statements Chapter Equity article Additional Paid-in
Ekuitas berasal dari penawaran perdana tahun Capital. Share issuance costs derived from the initial
2012 sebesar Rp31.910.365.455, penawaran umum public offering in 2012 amounting to
terbatas I tahun 2015 sebesar Rp37.328.848.507 dan Rp31,910,365,455, limited public offering I year 2015
penawaran umum terbatas II 2021 sebesar amounting to Rp37,328,848,507 and limited public
Rp17.412.464.970. offer II year 2021 amounting to Rp17,412,464,970.
42. SALDO LABA 42. RETAINED EARNINGS
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Telah Ditentukan Penggunaannya Appropriated
Saldo Awal 1.725.598.750.818 1.725.598.750.818 Beginning Balance
Saldo Akhir 1.725.598.750.818 1.725.598.750.818 Ending Balance
Belum Ditentukan Penggunaannya Unappropiated
Saldo Awal Tahun (13.710.682.193.585) (9.940.244.897.000) Beginning Balance
Laba (Rugi) yang Dapat Diatribusikan Profit (Loss) Attributable to Owners of
Kepada Pemilik Entitas Induk (939.551.265.976) (3.770.396.430.342) the Parent Entity
Pengukuran Kembali Program Remeasurement of Defined
Imbalan Pasti (191.971.106) (40.866.243) Benefit Plans
Penyesuaian atas Perubahan Kepemilikan Adjustment for Changes Ownership
Entitas Anak 10.059.353.483 -- in Subsidiaries
Saldo Akhir Tahun (14.640.366.077.184) (13.710.682.193.585) Ending Balance
Perusahaan dan entitas anak membuat penyisihan The Company and subsidiaries provided
untuk cadangan umum sesuai dengan UU No. 40 appropriation to general reserve in accordance with
tahun 2007 mengenai Perusahaan Terbatas. UU Law No. 40 year 2007 concerning Limited Company.
tersebut mengharuskan Perusahaan di Indonesia The law requires companies in Indonesia to provide
untuk membuat penyisihan cadangan umum a general reserve at least 20% of the issued and fully
sekurang- kurangnya 20% dari jumlah modal yang paid capital. Reserve funds should be maintained to
ditempatkan dan disetor penuh. Dana cadangan cover suffered losses and can be used as working
diadakan untuk menutupi kerugian yang diderita dan capital and other purposes by the decision of the
dapat dipergunakan sebagai modal kerja dan tujuan GMS.
lain menurut keputusan RUPS.
43. PENDAPATAN USAHA 43. REVENUES
31 Maret/ March 31 ,
2024 2023
Rp Rp
Jasa Konstruksi/ Construction Services 1.482.141.293.307 2.291.111.652.931
Bunga dari Jasa Konstruksi/ Interest from Construction Services -- 12.548.698.838
Penjualan Precast/ Precast Sales 364.700.042.463 103.980.785.255
Pendapatan Jalan Tol/ Toll Road Revenue 248.662.690.807 244.375.367.551
Pendapatan Property / Property Revenue 44.193.614.211 45.514.477.382
- 184 -
Page 182
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ March 31 ,
2024 2023
Rp Rp
Penjualan Infrastruktur Lainnya/ Other Infrastructure Revenue 12.794.927.654 11.847.556.321
Pendapatan Hotel/ Hotel Revenue 22.530.005.681 22.457.792.936
Sewa Gedung dan Peralatan/ Buildings and Equipment Rental 2.870.118.700 10.000.000
Jumlah/ Total 2.177.892.692.823 2.731.846.331.214
Rincian pendapatan usaha adalah sebagai berikut: The details of the revenues are as follows:
31 Maret/ March 31 ,
2024 2023
Rp Rp
Pihak Berelasi/ Related Parties
PT Cimanggis Cibitung Tollways 446.418.271.103 92.213.206.576
Adhi-Waskita-Jaya Konstruksi KSO 82.929.373.745 --
PT Jasamarga Japek Selatan 2.217.219.889 336.346.865.542
PT Cibitung Tanjung Priok Port Tollways -- 177.890.676.986
PT Angkasa Pura I (Persero) -- 64.808.777.030
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 250.290.879.435 105.440.115.927
Sub Jumlah/ Sub Total 781.855.744.172 776.699.642.061
Pihak Ketiga/ Third Parties
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 699.324.666.771 616.011.704.069
BPJT - PT Waskita Sriwijaya Tol 151.149.970.019 450.276.271.837
BPJT - PT Pemalang Batang Toll Road 116.389.152.973 110.791.121.712
BPJT - PT Waskita Transjawa Tol Road 74.208.250.067 245.974.584.939
BPJT - PT Trans Jabar Tol 35.231.489.617 124.926.433.348
BPJT - PT Waskita Bumi Wira 25.850.025.000 20.036.080.000
Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion ) 293.883.394.204 331.679.130.975
Sub Jumlah/ Sub Total 1.396.036.948.651 1.955.146.689.153
Jumlah/ Total 2.177.892.692.823 2.731.846.331.214
Rincian pemberi kerja dengan nilai kontribusi Details of the project owners with contribution value
pendapatan melebihi 10% dari pendapatan usaha exceeding 10% of the Group revenues for March 31,
Grup untuk 31 Maret 2024 dan 2023 sebagai berikut: 2023 and 2024 are as follows:
31 Maret/ March 31 ,
2024 2023
Rp Rp
Kementerian Pekerjaan Umum dan Perumahan Rakyat/
The Ministry of Public Works and Housing 699.324.666.771 616.011.704.069
PT Cimanggis Cibitung Tollways 446.418.271.103 --
BPJT - PT Waskita Sriwijaya Tol -- 450.276.271.837
PT Jasamarga Japek Selatan -- 336.346.865.542
Jumlah/ Total 1.145.742.937.874 1.402.634.841.448
44. BEBAN POKOK PENDAPATAN 44. COST OF REVENUES
31 Maret/ March 31 ,
2024 2023
Rp Rp
Jasa Konstruksi Construction Services
Bahan Baku 489.233.139.725 867.187.220.812 Raw Material
Subkontraktor 478.939.970.872 570.166.539.159 Subcontractor
Upah 91.692.785.021 190.649.317.644 Wages
Beban Tidak Langsung 357.993.835.588 447.006.941.225 Indirect Costs
Jumlah Jasa Konstruksi 1.417.859.731.206 2.075.010.018.840 Total Constructions Services
Jalan Tol 106.944.636.970 106.445.255.678 Toll Roads
Properti dan Hotel 51.157.560.585 55.105.557.926 Property and Hotel
Infrastruktur Lainnya 11.268.928.314 9.637.080.298 Others Infrastructure
- 185 -
Page 183
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ March 31 ,
2024 2023
Rp Rp
Produk Beton Concrete Products
Persediaan Awal 272.346.383.365 203.147.938.680 Beginning Balance
Pembelian 294.314.296.278 95.319.037.974 Purchases
Barang tersedia untuk Dijual 566.660.679.642 298.466.976.654 Goods Available for Sale
Persediaan Akhir - Pihak Ketiga 340.695.955.242 219.668.371.795 Ending Balance - Third Party
Beban Bahan Baku 225.964.724.400 78.798.604.859 Raw Material Expenses
Beban Upah 14.332.795.574 1.752.889.529 Direct Labour Expenses
Beban Overhead 33.576.348.004 4.660.672.809 Overhead Expenses
Jumlah Produk Beton 273.873.867.978 85.212.167.197 Total Concrete Products
Jumlah Beban Pokok Pendapatan 1.861.104.725.053 2.331.410.079.939 Total Cost of Revenues
45. BEBAN PENJUALAN DAN BEBAN UMUM DAN 45. SELLING EXPENSES AND GENERAL AND
ADMINISTRASI ADMINISTRATION EXPENSES
31 Maret/ March 31 ,
2024 2023
Rp Rp
Beban Penjualan/ Selling Expenses
Tender/ Tender 2.048.894.823 3.256.129.460
Pemasaran/ Marketing 43.611.445.969 25.899.076.489
Iklan/ Advertising 416.476.036 767.798.433
Sub Jumlah/ Sub Total 46.076.816.828 29.923.004.382
Beban Umum dan Administrasi/ General and Administrative Expenses
Gaji Pegawai/ Employee's Salaries 148.240.557.129 137.879.119.446
Umum/ General 29.298.148.391 31.455.131.253
Beban Produksi Tidak Teralokasi/ Unallocated Production Expenses 47.828.890.621 45.141.764.465
Penyusutan (Catatan 17)/ Depreciation (Note 17) 62.751.316.253 59.226.186.775
Gedung/ Building 5.188.733.659 15.743.209.166
Kantor/ Office 9.143.295.006 9.616.298.248
Perjalanan Dinas/ Travelling 5.643.275.203 9.596.698.453
THR/ THR Allowance 17.611.461.755 --
Jamsostek/ Jamsostek 5.218.120.410 6.689.889.503
Pesangon/ Severance 24.901.517.323 --
Amortisasi Aset/ Assets Amortization 10.109.829.578 10.308.883.194
--
Sub Jumlah/ Sub Total 365.935.145.328 325.657.180.503
Jumlah/ Total 412.011.962.156 355.580.184.885
Beban produksi tidak teralokasi merupakan beban Unallocated production expenses represent general
umum dan administrasi unit bisnis yang tidak and administrative expenses of a business unit that
berdampak secara langsung terhadap proses does not have a direct impact on the production
produksi seperti beban gaji, beban operasional, process such as salary expenses, operational
pembelian bahan bakar kendaraan dan lain-lain. expenses, purchase of vehicle fuel and others.
Beban umum dan administrasi - lain-lain merupakan General and administrative expenses - others
amortisasi atas aset lain-lain dan aset tak berwujud. represent the amortization of other assets and
intangible assets.
46. BEBAN - NON-CONTRIBUTING PLANT 46. NON-CONTRIBUTING PLANT - EXPENSES
Beban - Non-contributing Plant merupakan evaluasi Non-contributing Plant Expenses represent abnormal
atas jumlah normal atau tidak normal atas biaya amounts of materials, labor or other product costs,
produksi, yang meliputi jumlah yang tidak normal atas storage costs unless these costs are required in the
bahan, tenaga kerja atau biaya produk lainnya, biaya production process before proceeding to the next
penyimpanan kecuali biaya tersebut diperlukan production stage, and general and administrative
dalam proses produksi sebelum dilanjutkan pada costs, which do not contribute to making the inventory
tahap produksi selanjutnya, biaya administrasi dan in its current condition and location.
umum yang tidak memberikan kontribusi untuk
membuat persediaan berada dalam kondisi dan
lokasi saat ini.
Jumlah beban - Non-contributing Plant untuk periode Total Non-contributing Plant Expenses for the three
– periode tiga bulan yang berakhir 31 Maret 2024 dan month periods ending March 31, 2024 and 2023
2023 pada masing-masing sebesar amounted to Rp23,262,035,642 and
Rp23.262.035.642 dan Rp79.432.345.234. Rp79,432,345,234 respectively.
- 186 -
Page 184
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
47. PENDAPATAN (BEBAN) LAIN-LAIN - BERSIH 47. OTHER INCOME (EXPENSES) - NET
31 Maret/ March 31 ,
2024 2023
Rp Rp
Keuntungan dari Divestasi Entitas Anak dan Asosiasi/
Gain on Divesment of Subsidiary and Associates 250.389.348.334 --
Keuntungan atas Modifikasi Utang/ Gain on Modification of Debt -- 329.025.074.090
Kompensasi/ Compensation JSN -- 57.887.613.264
Pemulihan (Penyisihan) Kerugian Ekpektasian Penurunan Nilai (Catatan 8, 10, 11, 13)/
Recovery (Allowance) For Impairment Expected Credit Losses (Notes 8, 10, 11, 13) (37.113.186.649) 45.175.652.070
Pendapatan (Beban) Lain-lain Proyek/ Others Revenue (Expenses) Project (12.249.438.988) 1.320.288.641
Provisi atas Penurunan Nilai Persediaan dan Aset Tetap/
Provision of Impairment Losses Inventories and Property, Plant and Equipment (70.280.695) (76.883.484.815)
Pendapatan (Beban) Lain-lain KSO/ Others Revenue (Expenses) JV 2.898.039.568 254.156.958
Pendapatan (Beban) Lain-lain/ Others Revenue (Expense) (45.320.171.538) (567.365.137)
Jumlah/ Total 158.534.310.032 356.211.935.071
Pendapatan (beban) lain-lain - lain-lain merupakan Other income (expenses) - others represent non
pendapatan non-operasional yang berasal dari operating income from restructuring of bank loan and
restrukturisasi utang bank dan utang obligasi pada bonds payable in subsidiary, completed projects,
entitas anak, proyek yang sudah selesai, selisih dari others JV, difference between estimated accruals
estimasi akrual dibandingkan dengan realisasi yang compared to realization which is presented net of
disajikan bersih dengan beban lain-lain proyek other expenses for completed projects, profit on
selesai, laba atas divestasi, dan lain-lain KSO. divestment, and others JV.
48. BEBAN KEUANGAN 48. FINANCIAL CHARGES
Merupakan beban bunga atas utang bank/ non- bank, Represents group’s interest expenses on bank loans/
beban provisi, dan beban administrasi bank yang non-banks, provision fees, and administrative
terkait dengan perolehan pinjaman Grup selama expenses related to the acquisition of bank loans
periode berjalan setelah dikurangi biaya bunga yang during the current period after deducting the interest
secara langsung dapat diatribusikan dengan biaya costs which are directly attributable to the cost of a
perolehan suatu proyek tertentu yang memenuhi qualifying project and the interest expense on debt
syarat dan beban bunga atas utang obligasi Corporate bonds.
Perusahaan.
49. BAGIAN LABA (RUGI) BERSIH ENTITAS 49. EQUITY IN NET INCOME (LOSS) OF ASSOCIATES
ASOSIASI DAN VENTURA BERSAMA AND JOINT VENTURES
Berikut ini adalah data yang digunakan untuk Following the details of the calculation of basic
perhitungan laba (rugi) per saham dasar: earning (loss) per share:
31 Maret / March 31,
2024 2023
Rp Rp
Bagian Laba Bersih Ventura Equity in Net Income of
Bersama Konstruksi (41.218.277.608) (124.278.459.374) Construction Joint Ventures
Bagian Laba (Rugi) Bersih Equity in Net Income (Loss) of
Entitas Asosiasi (18.611.814.158) (7.567.691.488) Associates Entities
Jumlah (59.830.091.766) (131.846.150.862) Total
50. KEPENTINGAN NON-PENGENDALI 50. NON-CONTROLLING INTEREST
31 Maret/ March 31, 2024
Bagian Laba (Rugi) Bagian Laba (Rugi) Penambahan
Nilai Awal/ Tahun Berjalan/ Tahun Berjalan/ (Pengurangan)/ Nilai Akhir/
Kepemilikan/ Beginning Profit (Loss) Comprehensive Income Additional Ending
Ownership Balance Current Year (Loss) Current Year (Deduction) Balance
% Rp Rp Rp Rp Rp
PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for WTR) 7,90% 1.940.633.927.351 (5.468.019.622) -- -- 1.935.165.907.729
Masyarakat Umum (Untuk/ for WBP) 70,64% 3.278.211.609.135 (89.009.803.859) -- -- 3.189.201.805.276
RDPT WTTR (Untuk/ for WTTR) 11,92% 639.434.906.529 (604.422.103) -- -- 638.830.484.426
PT Sumber Mitra Jaya (Untuk/ for PBTR) 40,00% 208.537.283.345 (20.904.950.812) -- -- 187.632.332.533
PT Bagasasi Inti Pratama (untuk/ for WMR) 40,00% 158.444.262.771 (1.025.677.764) -- -- 157.418.585.007
PT Graha Jasa Ekatama (Untuk/ for WFPR) 40,00% 72.129.792.426 20.682.184 -- -- 72.150.474.610
PT Shalawat Power (Untuk/ for WSE) 6,00% 15.210.030.801 (650.936.438) -- -- 14.559.094.363
Perusahaan Daerah Prodexim (Untuk/ for WST) 0,81% 3.103.042.869 (30.077.194) -- -- 3.072.965.675
- 187 -
Page 185
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ March 31, 2024
Bagian Laba (Rugi) Bagian Laba (Rugi) Penambahan
Nilai Awal/ Tahun Berjalan/ Tahun Berjalan/ (Pengurangan)/ Nilai Akhir/
Kepemilikan/ Beginning Profit (Loss) Comprehensive Income Additional Ending
Ownership Balance Current Year (Loss) Current Year (Deduction) Balance
% Rp Rp Rp Rp Rp
PT Kaltim Binasarana Konstruksi (Untuk/ for TTB) 20,00% 1.633.697.683 (14.210) -- -- 1.633.683.473
PT Panca Wira Usaha (Untuk/ for WBW) 0,19% 950.407.969 (128.061.177) -- -- 822.346.792
Perusda Benuo Taka (Untuk/ for TTB) 15,00% 1.225.273.262 -- -- -- 1.225.273.262
Perusda Komaba (Untuk/ for TTB) 5,00% 408.424.422 (3.553) -- -- 408.420.869
Perusahaan Daerah Bende Seguguk (Untuk/ for WST) 1,00% (195.198.121) (36.994.948) -- -- (232.193.069)
Koperasi Waskita (Untuk/ for WKR) 0,01% 1.291.038 (35.343) -- -- 1.255.695
Koperasi Waskita (Untuk/ for WTR) 0,01% 1.003.938 -- -- -- 1.003.938
Koperasi Waskita (Untuk/ for WKI) 0,01% 34.799 -- -- -- 34.799
Koperasi Waskita (Untuk/ for WBP) 0,01% (405.652) (32.185) -- -- (437.837)
Koperasi Waskita (Untuk/ for WWE) 0,05% 3.380.795 17 -- -- 3.380.812
Koperasi Waskita (Untuk/ for TJT) 0,00% (4.662.397) (35.475) -- 4.697.872 --
Jumlah/ Total 6.319.728.102.963 (117.838.382.482) -- 4.697.872 6.201.894.418.353
31 Desember/ December 31, 2023
Bagian Laba (Rugi) Bagian Laba (Rugi) Penambahan
Nilai Awal/ Tahun Berjalan/ Tahun Berjalan/ (Pengurangan)/ Nilai Akhir/
Kepemilikan/ Beginning Profit (Loss) Comprehensive Income Additional Ending
Ownership Balance Current Year (Loss) Current Year (Deduction) Balance
% Rp Rp Rp Rp Rp
PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for WTR) 7,90% 2.033.632.643.095 (92.998.715.744) -- -- 1.940.633.927.351
Masyarakat Umum (Untuk/ for WBP) 70,64% 1.851.509.003.354 4.450.519.115 (107.134.156) 1.422.359.220.822 3.278.211.609.135
RDPT WTTR (Untuk/ for WTTR) 11,92% 629.153.411.627 10.281.494.902 -- -- 639.434.906.529
PT Sumber Mitra Jaya (Untuk/ for PBTR) 40,00% 371.350.414.458 (162.813.131.113) -- -- 208.537.283.345
PT Bagasasi Inti Pratama (untuk/ for WMR) 40,00% 161.634.455.696 (3.190.192.925) -- -- 158.444.262.771
PT Graha Jasa Ekatama (Untuk/ for WFPR) 40,00% 70.978.163.796 1.151.628.630 -- -- 72.129.792.426
PT Shalawat Power (Untuk/ for WSE) 6,00% 18.951.626.603 (3.741.595.802) -- -- 15.210.030.801
Perusahaan Daerah Prodexim (Untuk/ for WST) 0,81% 3.329.677.373 (226.634.504) -- -- 3.103.042.869
PT Kaltim Binasarana Konstruksi (Untuk/ for TTB) 20,00% 1.633.633.428 64.255 -- -- 1.633.697.683
PT Panca Wira Usaha (Untuk/ for WBW) 0,19% 1.452.888.533 (502.480.564) -- -- 950.407.969
Perusda Benuo Taka (Untuk/ for TTB) 15,00% 1.225.225.070 48.192 -- -- 1.225.273.262
Perusda Komaba (Untuk/ for TTB) 5,00% 408.408.358 16.064 -- -- 408.424.422
Perusahaan Daerah Bende Seguguk (Untuk/ for WST) 1,00% 83.562.318 (278.760.439) -- -- (195.198.121)
Koperasi Waskita (Untuk/ for WKR) 0,01% 1.416.744 (125.752) 46 -- 1.291.038
Koperasi Waskita (Untuk/ for WTR) 0,01% 1.003.938 -- -- -- 1.003.938
Koperasi Waskita (Untuk/ for WKI) 0,01% 510.123 (475.324) -- -- 34.799
Koperasi Waskita (Untuk/ for WBP) 0,01% (407.261) 1.609 -- -- (405.652)
Koperasi Waskita (Untuk/ for WWE) 0,05% (997.753) (148.711) 4.527.259 -- 3.380.795
Koperasi Waskita (Untuk/ for TJT) 0,00% (5.070.147) (92.250) -- 500.000 (4.662.397)
Jumlah/ Total 5.145.339.569.353 (247.868.580.361) (102.606.851) 1.422.359.720.822 6.319.728.102.963
51. LABA (RUGI) PER SAHAM 51. EARNING (LOSS) PER SHARE
Berikut ini adalah data yang digunakan untuk Following the details of the calculation of basic
perhitungan laba (rugi) per saham dasar: earning (loss) per share:
31 Maret/ March 31 ,
2023 2022
Rp Rp
Laba Bersih yang Diatribusikan Net Income Attributable
Kepada Entitas Induk (939.551.265.976) (374.933.362.682) to Parent Entity
Rata - rata Bertimbang Saham 28.806.807.016 28.806.807.016 Weighted Average of Shares
Laba (Rugi) Per Saham Dasar (32,62) (13,02) Basic Earning (Loss) Per Shares
52. BANK GARANSI DAN LETTER OF CREDIT 52. BANK GUARANTEE AND LETTER OF CREDIT
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As at March 31, 2024 and December 31, 2023, the
Perusahaan telah mendapatkan fasilitas bank Company has obtained the bank guarantees, LC and
garansi, L/C dan SKBDN sebagai berikut: SKBDN facility as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ the Company
PT Bank Rakyat Indonesia (Persero) Tbk 1.700.000.000.000 1.700.000.000.000
PT Bank Mandiri (Persero) Tbk 1.700.000.000.000 1.700.000.000.000
PT Bank Negara Indonesia (Persero) Tbk 645.000.000.000 645.000.000.000
Indonesia Eximbank 147.643.640.346 147.643.640.346
Jumlah/ Total 4.192.643.640.346 4.192.643.640.346
- 188 -
Page 186
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Perusahaan juga memiliki fasilitas bank garansi, L/C The Company also obtained bank guarantess, L/C
dan SKBDN yang telah digunakan sebagai berikut: and SKBDN facilities with the total usage as follows:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Pihak Berelasi/ Related Parties
Perusahaan/ the Company
PT Bank Rakyat Indonesia (Persero) Tbk 333.458.011.150 417.820.423.158
PT Bank Mandiri (Persero) Tbk 389.981.930.072 524.762.455.644
PT Bank Negara Indonesia (Persero) Tbk 180.434.254.234 201.107.976.137
Indonesia Eximbank 147.643.640.346 147.643.640.346
Jumlah/ Total 1.051.517.835.802 1.291.334.495.285
53. INFORMASI ARUS KAS 53. CASHFLOW INFORMATION
a. Transaksi Non-Kas a. Non-Cash Transaction
Tabel di bawah ini menunjukkan transaksi non-kas The below table shows the Group’s non-cash
Grup selama tahun berjalan adalah sebagai transactions during the year:
berikut:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Penambahan Aset Tetap Melalui Acquisition of Fixed Asset Through
Utang Usaha -- 3.069.336.529 Accounts Payable
Penambahan Aset Tak Berwujud Melalui Acquisition of Intangible Asset Through
Liabilitas dan Akuisisi 61.491.970.048 738.505.870.657 Liabilities and Acquisition
Penambahan Aset Hak Guna Melalui Acquisition of Lease Assets Through
Sewa Pembiayaan 5.414.152.893 13.535.563.533 Finance Lease
Jumlah 66.906.122.941 755.110.770.719 Total
b. Rekonsiliasi Liabilitas Yang Timbul Dari b. Reconciliation of liabilities arising from
Aktivitas Pendanaan financing activities
Tabel di bawah ini menjelaskan perubahan dalam The table below explains the changes in the
liabilitas Grup yang timbul dari aktivitas Group’s liabilities arising from financing activities,
pendanaan, termasuk perubahan yang timbul dari including both cash and non-cash changes.
arus kas dan perubahan nonkas. Liabilitas yang Liabilities arising from financing activities are
timbul dari aktivitas pendanaan adalah liabilitas those for which cash flows were, or future cash
yang arus kas, atau arus kas masa depannya, flows will be, classified in the Group’s
diklasifikasikan dalam laporan arus kas consolidated statement of cash flows as cash
konsolidasian Grup sebagai arus kas dari aktivitas flows from financing activities.
pendanaan.
Arus Kas dari Aktivitas Pendanaan/ Perubahan Transaksi non Kas/
1 Januari/ Financing Cash Flows Non-cash Changes 31 Maret/
January 1, Penambahan/ Pembayaran/ Biaya Emisi/ Amortisasi/ Restrukturisasi/ Sewa Pembiayaan/ March 31,
2023 Additional Payment Issuance cost Amortization Restructurisation Finance Lease 2024
Rp Rp Rp Rp Rp Rp Rp Rp
Pinjaman Bank 47.839.189.027.957 751.030.000 (1.719.784.039.977) -- -- (1.445.115.888) -- 46.118.710.902.092 Bank Loans
Utang Lembaga Keuangan Non-Bank 5.785.277.386.796 98.887.833.204 (2.390.657.647) -- -- 109.323.180.898 -- 5.991.097.743.251 Loan to Financial Institution Non-Bank
Utang Obligasi 8.828.624.933.131 -- -- -- 5.181.600.690 -- -- 8.833.806.533.821 Bonds Payable
Utang Sukuk Mudharabah 1.145.181.107.470 -- -- -- 83.307.576 -- -- 1.145.264.415.046 Sukuk Mudharabah Payable
Surat Utang Jangka Menengah 735.727.511.026 -- -- -- -- 14.841.912.191 -- 750.569.423.217 Medium Term Notes
Liabilitas Sewa 27.938.505.597 -- (14.631.285.746) -- -- -- 5.414.152.893 18.721.372.744 Lease Liabilities
Jumlah 64.361.938.471.977 99.638.863.204 (1.736.805.983.370) -- 5.264.908.266 122.719.977.201 5.414.152.893 62.858.170.390.171 Total
Arus Kas dari Aktivitas Pendanaan/ Perubahan Transaksi non Kas/
1 Januari/ Financing Cash Flows Non-cash Changes 31 Desember/
January 1, Penambahan/ Pembayaran/ Biaya Emisi/ Amortisasi/ Utang Bank/ Sewa Pembiayaan/ December 31,
2023 Additional Payment Issuance cost Amortization Bank Loan Finance Lease 2023
Rp Rp Rp Rp Rp Rp Rp Rp
Pinjaman Bank 47.563.432.430.672 22.417.782.389 (306.414.138.026) -- -- 559.752.952.921 -- 47.839.189.027.957 Bank Loans
Utang Lembaga Keuangan Non-Bank 4.538.846.968.540 928.545.091.603 (25.961.986.811) -- -- 343.847.313.464 -- 5.785.277.386.796 Loan to Financial Institution Non-Bank
Utang Obligasi 10.659.386.827.469 -- -- -- 20.008.026.773 (1.850.769.921.111) -- 8.828.624.933.131 Bonds Payable
Utang Sukuk Mudharabah 1.144.905.871.186 -- -- -- 275.236.284 -- -- 1.145.181.107.470 Sukuk Mudharabah Payable
Surat Utang Jangka Menengah 725.000.000.000 -- -- -- -- 10.727.511.026 -- 735.727.511.026 Medium Term Notes
Liabilitas Sewa 38.410.896.550 -- (24.007.954.486) -- -- -- 13.535.563.533 27.938.505.597 Lease Liabilities
Jumlah 64.669.982.994.417 950.962.873.992 (356.384.079.323) -- 20.283.263.057 (936.442.143.700) 13.535.563.533 64.361.938.471.977 Total
- 189 -
Page 187
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
54. ASET DAN LIABILITAS MONETER DALAM MATA 54. MONETARY ASSETS AND LIABILITIES IN
UANG ASING FOREIGN CURRENCY
Pada tanggal 31 Maret 2024 dan 31 Desember 2023, As at March 31, 2024 and December 31, 2023, the
Perusahaan mempunyai aset dan liabilitas moneter Company have monetary assets and liabilities
dalam mata uang asing sebagai berikut: denominated in foreign currencies were as follows:
31 Maret/ March 31, 2024 31 Desember/ December 31, 2023
Mata Uang Asing/ Ekuivalen/ Mata Uang Asing/ Ekuivalen/
Foreign Currency Equivalent Foreign Currency Equivalent
Aset/ Assets
Kas dan Setara Kas/
Cash and Cash Equivalents USD 105.307 1.669.433.118 119.559 1.843.116.792
YEN 3.630.793 379.438.709 68.300.019 7.482.065.619
EURO 551 9.460.455 551 9.446.789
SAR 31.036 131.182.201 31.913 131.182.201
MYR 3.679 12.328.016 3.689 12.328.016
Piutang Usaha/
Accounts Receivable SAR 12.539.267 53.000.910.398 12.893.701 53.000.910.398
USD 1.469.957 23.303.223.698 1.511.626 23.303.223.698
Piutang Retensi/
Retention Receivables SAR 6.555.260 27.707.741.349 6.740.551 27.707.741.349
USD 6.527.048 103.473.297.158 6.712.071 103.473.281.741
Tagihan Bruto Kepada Pengguna Jasa/
Gross Amount Due From Customers USD 8.349.845 132.370.091.093 6.062.256 93.455.741.459
Jumlah/ Total 342.057.106.195 310.419.038.062
55. SEGMEN OPERASI 55. OPERATION SEGMENT
a. Infromasi tentang Produk dan Jasa a. Information Related to Products and Services
Segmen operasi Perusahaan dikelompokkan The Company’s operation segment is grouped
berdasarkan pekerjaan yang dilakukan. based on the work performed.
Informasi Segmen berdasarkan jenis usaha/ Details of information of segment based on the
produk adalah sebagai berikut: type of business/ product were as follows:
31 Maret/ March 31, 2024
Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Infrastruktur Lainnya/ Tol/ Jumlah/
Constructions Building Rental Property & Hotel Precast Others Infrastructure Toll Total
Rp Rp Rp Rp Rp Rp Rp
Pendapatan Usaha 1.482.141.293.307 2.870.118.700 66.723.619.892 364.700.042.463 12.794.927.654 248.662.690.807 2.177.892.692.823
Beban Pokok Pendapatan 1.417.859.731.206 -- 51.157.560.585 273.873.867.978 11.268.928.314 106.944.636.970 1.861.104.725.053
Laba Bruto 64.281.562.101 2.870.118.700 15.566.059.307 90.826.174.485 1.525.999.340 141.718.053.837 316.787.967.770
Tidak Dapat Dialokasikan:
Beban Usaha -- -- -- -- -- -- (435.273.997.798)
Penghasilan Lain-lain - Bersih -- -- -- -- -- -- 241.707.866.149
Laba Sebelum Pajak dan Beban Keuangan -- -- -- -- -- -- 123.221.836.121
Beban Keuangan -- -- -- -- -- -- (1.099.421.379.964)
Bagian Rugi Bersih Entitas Asosiasi
dan Ventura Bersama -- -- -- -- -- -- (59.830.091.766)
Laba Sebelum Pajak -- -- -- -- -- -- (1.036.029.635.609)
Beban Pajak Penghasilan -- -- -- -- -- -- (21.360.012.849)
Laba Bersih Periode Berjalan (1.057.389.648.458)
31 Maret/ March 31, 2023
Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Infrastruktur Lainnya/ Tol/ Jumlah/
Constructions Building Rental Property & Hotel Precast Others Infrastructure Toll Total
Rp Rp Rp Rp Rp Rp Rp
Pendapatan Usaha 2.303.660.351.769 10.000.000 67.972.270.318 103.980.785.255 11.847.556.321 244.375.367.551 2.731.846.331.214
Beban Pokok Pendapatan 2.075.010.018.840 -- 55.105.557.926 85.212.167.197 9.637.080.298 106.445.255.678 2.331.410.079.939
Laba Bruto 228.650.332.929 10.000.000 12.866.712.392 18.768.618.058 2.210.476.023 137.930.111.873 400.436.251.275
Tidak Dapat Dialokasikan:
Beban Usaha -- -- -- -- -- -- (435.012.530.119)
Penghasilan Lain-lain - Bersih -- -- -- -- -- -- 521.396.498.040
Laba Sebelum Pajak dan Beban Keuangan -- -- -- -- -- -- 486.820.219.196
Beban Keuangan -- -- -- -- -- -- (703.969.585.660)
Bagian Rugi Bersih Entitas Asosiasi
dan Ventura Bersama -- -- -- -- -- -- (131.846.150.862)
Laba Sebelum Pajak -- -- -- -- -- -- (348.995.517.326)
Beban Pajak Penghasilan -- -- -- -- -- -- (46.365.250.778)
Laba Bersih Periode Berjalan (395.360.768.104)
- 190 -
Page 188
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ March 31, 2024
Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Infrastruktur Lainnya/ Tol/ Jumlah/
Constructions Building Rental Property & Hotel Precast Others Infrastructure Toll Total
Rp Rp Rp Rp Rp Rp Rp
Aset
Piutang Usaha 2.311.830.091.613 12.291.020.518 -- 578.090.866.567 -- -- 2.902.211.978.698
Piutang Retensi 1.589.096.422.159 -- -- -- -- -- 1.589.096.422.159
Tagihan Bruto Kepada Pengguna Jasa 4.842.249.852.218 -- -- -- -- -- 4.842.249.852.218
Persediaan 224.314.259.313 -- 3.789.854.777.910 144.193.883.880 21.718.053.439 -- 4.180.080.974.542
Aset yang Tidak Dapat Dialokasikan -- -- -- -- -- -- 78.691.353.928.072
Jumlah Aset 92.204.993.155.689
Liabilitas
Utang Usaha 5.917.034.460.253 -- -- -- -- -- 5.917.034.460.253
Utang Bruto Subkontraktor 1.379.982.674.348 -- 32.333.986.527 182.514.377.124 2.958.739.480 -- 1.597.789.777.479
Liabilitas yang Tidak Dapat Dialokasikan -- -- -- -- -- -- 74.060.993.204.468
Jumlah Liabilitas 81.575.817.442.200
31 Desember / December 31, 2023
Konstruksi/ Sewa Gedung/ Properti & Hotel/ Beton Pracetak/ Infrastruktur Lainnya/ Tol/ Jumlah/
Constructions Building Rental Property & Hotel Precast Others Infrastructure Toll Total
Rp Rp Rp Rp Rp Rp Rp
Aset
Piutang Usaha 1.123.526.478.382 6.672.156.663 -- 520.124.945.565 -- -- 1.650.323.580.610
Piutang Retensi 1.490.267.616.686 -- -- -- -- -- 1.490.267.616.686
Tagihan Bruto Kepada Pengguna Jasa 4.496.709.067.451 -- -- -- -- -- 4.496.709.067.451
Persediaan 260.147.584.898 -- 3.763.731.218.414 145.619.908.820 22.965.816.005 -- 4.192.464.528.137
Aset yang Tidak Dapat Dialokasikan -- -- -- -- -- -- 83.766.132.665.083
Jumlah Aset 95.595.897.457.967
Liabilitas
Utang Usaha 5.661.220.681.629 -- -- -- -- -- 5.661.220.681.629
Utang Bruto Subkontraktor 1.450.400.358.668 -- 32.526.744.384 201.746.143.353 3.040.123.510 -- 1.687.713.369.915
Liabilitas yang Tidak Dapat Dialokasikan -- -- -- -- -- -- 76.645.451.855.264
Jumlah Liabilitas 83.994.385.906.808
56. PERKARA HUKUM 56. LEGAL CASES
1. Perkara Gugatan Melawan Hukum Proyek Tol 1. Lawsuits Against the Law of the Becakayu
Becakayu Toll Road Project
Roswinawaty Sitompul mengajukan gugatan ke Roswinawaty Sitompul filed a lawsuit with the
Pengadilan Negeri Jakarta Timur dengan East Jakarta District Court with Case No.
Perkara No. 502/Pdt.G/2018/PN.Jkt.Tim dengan 502/Pdt.G/2018/PN.Jkt.Tim with the defendant:
tergugat:
1. Ahli Waris Alm. H. Asmawih (Tergugat I); 1. The Heir Alm H Asmawih (Defendant I);
2. Kementrian PUPR (Tergugat II); 2. Ministry of PUPR (Defendant II);
3. Pemerintah Provinsi DKI Jakarta Cq Panitia 3. DKI Jakarta Provincial Government Cq Land
Pengadaan Tanah untuk Kepentingan Procurement Committee for Public Interest
Umum (Tergugat III); (Defendant III);
4. Perusahaan Umum Jasa Tirta II (Tergugat 4. Jasa Tirta II Public Company (Defendant IV);
IV);
5. Badan Pertanahan Nasional RI (Tergugat 5. Indonesia National Land Agency (Defendant
V); V);
6. Pemprov Jakarta Cq Kecamatan Makasar 6. Jakarta Provincial Government Cq Makasar
(Tergugat VI); District (Defendant VI);
7. Pemprov Jakarta Cq Kecamatan Cipinang 7. Jakarta Provincial Government Cq Cipinang
(Tergugat VII); District (Defendant VII);
8. Perusahaan (Tergugat VIII). 8. The Company (Defendant VIII).
Nilai Gugatan yang diajukan sebesar The value of lawsuit filed amounting to
Rp6.428.796.000. Rp6,428,796,000.
Pada tanggal 25 November 2021 diterima On November 25, 2021, a Notice of Cassation
Pemberitahuan Pernyataan Kasasi dan Memori Statement and a Memorandum of Cassation was
Kasasi terkait perkara a quo. received regarding the a quo case.
Pada tanggal 7 Desember 2021 telah diterima On December 7, 2021, it has been accepted that
surat panggilan (relaas) penyerahan kontra the submission of the counter memorandum of
memori kasasi atas perkara a quo. cassation for the a quo case has been received.
- 191 -
Page 189
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company is still
masih memonitor putusan kasasi. monitoring cassation decision.
2. Perkara Gugatan Perbuatan Melawan Hukum 2. Lawsuit Against the Law on Unlawful
Ganti Rugi atas Pembangunan Proyek Jalan Indemnity for the Construction of
Tol Cimanggis Cibitung II the Cimanggis Cibitung II Toll Road Project
PT Agung Graha Persada Utama mengajukan PT Agung Graha Persada Utama filed a lawsuit
gugatan ke Pengadilan Negeri Jakarta Selatan to Jakarta Selatan District Court with Case No.
dengan Perkara No. 641/Pdt.g/2020/PN.Jkt.Sel 641/Pdt.g/2020/PN.Jkt.Sel with the Company
dengan Perusahaan sebagai Turut Tergugat II. as co-Defendant II.
Pada tanggal 11 Oktober 2021 diadakan sidang On October 11, 2021, a session will be held with
dengan agenda Pembacaan Putusan Sela yang the agenda for Reading the Interlocutory
amarnya sebagai berikut: Decision, the order of which is as follows:
1. Mengabulkan Eksepsi Tergugat II tentang 1. Granted Defendant II's Exception regarding
kompetensi relatif. relative competence.
2. Menyatakan bahwa Pengadilan Negeri 2. To declare that the South Jakarta District
Jakarta Selatan tidak berwenang secara Court has no relative authority to examine
relatif untuk memeriksa dan mengadili and adjudicate the a quo case.
Perkara a quo.
3. Menghukum Penggugat untuk membayar 3. Sentencing the Plaintiff to pay the costs
biaya yang timbul dari Perkara ini arising from this case amounting to
sejumlah Rp3.708.800. Rp3,708,800.
Telah diterima Salinan Putusan Resmi A copy of the official decision of the District Court
Pengadilan Negeri atas Perkara a quo on the a quo case has been received on
pada tanggal 3 November 2021. November 3, 2021.
Pada tanggal 6 Juli 2022 diterima relaas On July 6, 2022, a notification of the submission
pemberitahuan penyampaian Memori Banding of a Memorandum of Appeal for the a quo case
atas Perkara a quo. was received.
Pada tanggal 2 Februari 2023 agenda On February 2, 2023, the agenda for reading
pembacaan Putusan Banding dengan amar the Appeal Decision is as follows:
sebagai berikut:
1. Menerima permohonan banding dari 1. Received the original Appellant's appeal
Pembanding semula Penggugat; from the Plaintiff;
2. Menguatkan putusan Pengadilan Negeri 2. Strengthening the decision of the South
Jakarta Selatan Nomor 641/Pdt.G/2020/PN Jakarta District Court Number
Jkt.Sel tanggal 11 Oktober 2021; 641/Pdt.G/2020/PN Jkt.Sel dated 11
October 2021;
3. Menghukum Pembanding semula 3. Sentenced the plaintiff's original appellant to
Penggugat untuk membayar biaya perkara pay the costs of the case at both court levels,
dalam kedua tingkat peradilan, yang dalam which at the appeal level amounted to
tingkat banding sebesar Rp150.000. Rp150,000.
Pada tanggal 15 Mei 2023 Penggugat telah On May 15 2023, the Plaintiff filed an appeal
mengajukan Kasasi atas Putusan Banding against the appeal decision in the a quo case;
Perkara a quo;
Pada tanggal 29 Mei 2023 telah diserahkan On May 29 2023, the Cassation Memorandum
Memori Kasasi atas Perkara a quo. regarding the a quo case was submitted.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company is still
masih memonitor putusan kasasi. monitoring cassation decision.
3. Perkara Gugatan Perbuatan Melawan Hukum 3. Case of Unlawful Acts of Law Land Dispute
Sengketa Tanah Pembangunan Pabrik Patun Construction of Makateks Patun Factory.
Makateks.
Husain dan H. Nanring mengajukan gugatan ke Husain dan H.Nanring filed a lawsuit to
Pengadilan Negeri Makassar dengan Perkara the Makassar District Court with the case No.
- 192 -
Page 190
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
No. 315/Pdt.G/2022/Pn.Mks dengan 315/Pdt.G/2022/Pn.Mks with the Company as
Perusahaan sebagai Tergugat. Penggugat the Defendant. The Plaintiff stated that the
menyatakan tanah yang disengketakan adalah disputed land belonged to the Plaintiff.
milik Penggugat.
Pada tanggal 16 Januari 2023 diadakan sidang On January 16, 2023 a hearing was held with
dengan agenda Pembacaan Putusan Sela. the agenda for Reading the Interlocutory
Decision.
Amar Putusan Sela: Interlocutory Judgement:
1. Mengabulkan permohonan gugatan 1. Granted the request for an intervention
intervensi untuk masuk dalam perkara lawsuit to enter into the case as an
sebagai pihak intervensi. intervening party.
2. Menghukum Para Penggugat dan Para 2. Sentenced the Plaintiffs and Defendants to
Tergugat membayar biaya perkara yang pay court costs which amounted to nil.
jumlahnya nihil.
4. Perkara Gugatan Perbuatan Melawan Hukum 4. Case of Unlawful Acts of the Tebing Tinggi
Proyek Pembangunan Jalan Tol Tebing Toll Road Development Project - Prapat -
Tinggi - Prapat - Sibolga Sibolga
Edy Syahputra Saragih dkk mengajukan gugatan Edy Syahputra Saragih et al filed a lawsuit with
ke Pengadilan Negeri Sei Rampah dengan the Sei Rampah District Court with a case No.
Perkara No. 55/Pdt.G/2022/PN.Srh dengan 55/Pdt.G/2022/PN.Srh with the Company as
Perusahaan sebagai Tergugat. Nilai Gugatan Defendant. The value of the material lawsuit filed
materiil yang diajukan sebesar Rp7.239.150.000 was Rp7,239,150,000 and the immaterial filed
dan gugatan imateriil sebesar Rp600.000.000. was Rp600,000,000.
Pada tanggal 26 Juni 2023 diadakan sidang On June 26, 2023, a hearing was held with the
dengan agenda pembacaan kesimpulan. agenda of reading the conclusions.
Pada tanggal 25 Juli 2023 diadakan sidang On July 25 2023, a hearing was held with
dengan agenda pembacaan Putusan melalui E- the agenda of reading the verdict via E-Litigation
Litigasi Putusan Pengadilan Negeri Sei Rampah Verdict of the Sei Rampah District Court with
dengan amarnya sebagai berikut: the following ruling:
Dalam Eksepsi In Exception
1. Mengabulkan eksepsi Tergugat I dan VI 1. Granted the exception of Defendants I and
mengenai gugatan kabur atau tidak jelas VI regarding the lawsuit being vague or
(obscuur libel). unclear (obscuur libel).
Dalam Pokok Perkara In the Main Case
2. Menyatakan gugatan para Penggugat tidak 2. Declaring the Plaintiffs' claim unacceptable
dapat diterima (Niet Ontvankelijke (Niet Ontvankelijke verklaard);
verklaard);
3. Menghukum Para Penggugat untuk 3. Punish the Plaintiffs to pay the court costs
membayar biaya perkara yang timbul. incurred.
5. Perkara Gugatan Melawan Hukum Proyek 5. Case of Unlawful Acts of the Cibitung -
Pembangunan Jalan Tol Cibitung - Cilincing II Cilincing II Tol Development Project
Tio Melya mengajukan gugatan ke Pengadilan Tio Melya filed a lawsuit with the North Jakarta
Negeri Jakarta Utara dengan Perkara District Court with a case No.
No. 644/Pdt.g/2022/PN.Jkt.Ut dengan 644/Pdt.g/2022/PN.Jkt.Ut with the Company
Perusahaan sebagai Tergugat. Nilai Gugatan as Defendant. The material lawsuit filed was
materiil yang diajukan sebesar Rp7.730.828.601 Rp7,730,828,601 and the immaterial filed was
dan imateriil sebesar Rp2.000.000.000. Rp2,000,000,000.
Pada tanggal 31 Mei 2023 diadakan sidang On May 31, 2023 a hearing was held with
dengan agenda pembacaan putusan Pengadilan the agenda for reading the decision of the North
Negeri Jakarta Utara dengan amarnya sebagai Jakarta District Court with the following orders:
berikut :
1. Mengabulkan Gugatan Para Penggugat 1. Granted the Plaintiffs' Claim in part;
untuk sebagian;
- 193 -
Page 191
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
2. Menyatakan Tergugat 1 dan Tergugat 2 2. Declare that Defendant 1 and Defendant 2
telah melakukan perbuatan melawan hukum have committed an unlawful act which is
yang merugikan Penggugat; detrimental to the Plaintiff;
3. Menghukum Tergugat 2 untuk membayar 3. Sentenced Defendant 2 to pay land
ganti kerugian tanah atas penggunaan dan/ compensation for the use and/ or
atau pengadaan tanah untuk Proyek Jalan procurement of land for the Cibitung -
Tol Cibitung - Cilincing kepada Penggugat 1 Cilincing Toll Road Project to Plaintiff 1 in the
sebesar Rp7.367.497.782. amount of Rp7,367,497,782.
4. Menghukum Tergugat 2 untuk membayar 4. Ordered Defendant 2 to pay land
ganti kerugian tanah atas penggunaan dan/ compensation for the use and/ or
atau pengadaan tanah untuk Proyek Jalan procurement of land for the Cibitung
Tol Cibitung-Cilincing kepada Penggugat 2 Cilincing Toll Road Project to Plaintiff 2 in
sebesar Rp363.330.819. the amount of Rp363,330,819.
Pada tanggal 5 September 2023 Tergugat I dan On September 5 2023, Defendants I and II filed
II mengajukan Kasasi atas perkara a quo. a cassation regarding the a quo case.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company is still
masih memonitor putusan kasasi. monitoring cassation decision.
6. Perkara Gugatan Perbuatan Melawan Hukum 6. Case of Unlawful Accidents on the
Kecelakaan di Ruas Tol Kayuagung - Mesuji Kayuagung - Mesuji Toll Road
Sukandar dan dkk mengajukan gugatan ke Sukandar el al filed a lawsuit with the Kayuagung
Pengadilan Negeri Kayuagung dengan Perkara District Court with a case No.
No. 2/Pdt.G/2023/PN.Kag dengan Perusahaan 2/Pdt.G/2023/PN.Kag with the Company as
sebagai Tergugat. Nilai Gugatan materiil yang Defendant. The material lawsuit filed was
diajukan sebesar Rp1.897.242.828 dan imateriil Rp1,897,242,828 and the immaterial filed was
sebesar Rp10.000.000.000. Rp10,000,000,000.
Pada tanggal 21 Juni 2023 diadakan sidang On June 21, 2023 a trial was held with an agenda
dengan agenda pemeriksaan saksi. for examining witnesses.
Pada tanggal 21 September 2023 diadakan On September 21 2023, a trial was held with a
sidang dengan agenda putusan namun ditunda. decision agenda but it was postponed.
Pada tanggal 9 Oktober 2023 diadakan sidang On October 9 2023, a trial was held with
dengan agenda pembacaan putusan yang the agenda for reading the verdict which was as
amarnya sebagai berikut : follows:
- Menerima dan mengabulkan Gugatan Para - Accept and grant the Plaintiffs' lawsuit in
Penggugat untuk sebagian; part;
- Menyatakan Tergugat I,II dan III telah - Declare that Defendants I, II and III have
melakukan Perbuatan Melawan Hukum; committed unlawful acts;
- Menghukum Tergugat I, Tergugat II dan - Sentence Defendant I, Defendant II and
Tergugat III secara tanggung renteng untuk Defendant III jointly and severally to pay
membayar kerugian kepada Penggugat I losses to Plaintiff I and Plaintiff II consisting
dan Penggugat II terdiri dari kerugian materiil of material losses for Plaintiff I amounting to
Penggugat I sebesar Rp391.370.953 dan Rp391,370,953 and the material loss of
kerugian materill Penggugat II sebesar Plaintiff II amounting to Rp255,652,616 and
Rp255.652.616 serta dihukum pula untuk also sentenced to pay compensation for
membayar ganti kerugian imateriil yang the immaterial losses suffered by
dialami oleh Para Penggugat sebesar the Plaintiffs amounting to Rp5,000,000,000.
Rp5.000.000.000.
Pada tanggal 20 Oktober 2023 Para Tergugat On October 20, 2023, the Defendants filed an
mengajukan Banding atas Putusan Pengadilan appeal against the a quo decision of
Negeri Kayuagung a quo. the Kayuagung District Court.
Pada tanggal 10 Januari 2024 telah dibacakan On January 10, 2024, the appeal decision was
putusan banding dengan amarnya sebagai read with the following ruling:
berikut:
Mengubah putusan Pengadilan Negeri Amend the decision of the Kayuagung District
Kayuagung Nomor 2/Pdt.G/2023/PN Kag Court Number 2/Pdt.G/2023/PN Kag dated
- 194 -
Page 192
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
tanggal 9 Oktober 2023 yang dimohonkan October,9 2023 which is being appealed, only
banding tersebut,sekedar mengenai besarnya regarding the amount of immaterial
ganti rugi immateril, sehingga amar compensation, so that the full ruling reads as
selengkapnya berbunyi sebagai berikut: follows:
1. Menerima dan mengabulkan gugatan para 1. Accept and partially grant the claim of the
Terbanding semula para Penggugat untuk Respondents and the Plaintiffs;
sebagian; 2. State that Appellant I was originally
2. Menyatakan Pembanding I semula Tergugat I, Defendant I, Appellant II was originally
Pembanding II semula Tergugat II dan Defendant II and Appellant III was originally
Pembanding III semula Tergugat III telah Defendant III who had committed unlawful
melakukan Perbuatan Merlawan Hukum; acts;
3. Menyatakan Pembanding I semula Tergugat I, 3. Declare that Appellant I was originally
Pembanding II semula Tergugat II dan Defendant I, Appellant II was originally
Pembanding III semula Tergugat III Defendant II and Appellant III was originally
bertanggungjawab secara tanggung renteng Defendant III jointly and severally responsible
atas peristiwa kecelakaan lalu lintas yang for the traffic accident that occurred at KM 271
terjadi di KM 271 Tol Terpeka pada tanggal 1 of the Terpeka Toll Road on June 1 2022;
Juni 2022;
4. Menghukum Pembanding I,II dan III semula 4. Sentenced Appellants I, II and III, originally
Tergugat I,II dan III secara tanggung renteng Defendants I, II and III, jointly and severally to
untuk membayar kerugian kepada Terbanding pay losses to Appellee I, originally Plaintiff I,
I semula Penggugat I dan Terbanding II and Appellee II, originally Plaintiff II,
semula Penggugat II terdiri dari kerugian consisting of material losses to Appellee I,
Materil Terbanding I semula Penggugat I originally Plaintiff I, amounting to Rp.
sebesar Rp391.370.935,00 (tiga ratus 391,370,935.00 ( three hundred ninety-one
sembilan puluh satu juta tiga ratus tujuh puluh million three hundred seventy thousand nine
ribu sembilan ratus tiga puluh lima rupiah) dan hundred thirty-five rupiah) and plaintiff II's
kerugian materiil Penggugat II sebesar material loss amounted to Rp.
Rp255.652.616,00 (dua ratus lima puluh lima 255,652,616.00 (two hundred fifty-five million
juta enam ratus lima puluh dua ribu enam six hundred fifty-two thousand six hundred
ratus enam belas rupiah) serta dihukum pula and sixteen rupiah) and was sentenced also
membayar ganti kerugian Immateril yang pay immaterial compensation suffered by the
dialami oleh Para Terbanding semula Para Appellees and the Plaintiffs amounting to
Penggugat sebesar Rp2.000.000.000,00 (dua Rp2,000,000,000.00 (two billion) rupiah;
miliar) rupiah;
5. Menolak gugatan para Terbanding semula 5. Reject the claims of the Appellees and the
para Penggugat selain dan selebihnya; Plaintiffs in addition to and in addition;
Pada tanggal 23 Januari 2024 Para Tergugat On January 23 2024, the Defendants filed an
menyatakan Kasasi atas Putusan Banding appeal against the appeal decision in the a quo
Perkara a quo. case.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company is still
masih memonitor pelaksanaan sidang monitoring the implementation of the next trial.
selanjutnya.
7. Perkara Gugatan Melawan Hukum Proyek 7. Lawsuit Case Against the Law of SUTT 150 Kv
SUTT 150 Kv New Balikpapan - PLTU New Balikpapan Project - PLTU Kariangau
Kariangau
Robby Suleman Runtu dkk mengajukan gugatan Robby Suleman Runtu filed a lawsuit with
ke Pengadilan Negeri Balikpapan dengan the Balikpapan District Court with a case No.
Perkara No. 53/Pdt.G/2023/PN.Bpp dengan 53/Pdt.G/2023/PN.Bpp with the Company as
Perusahaan sebagai Tergugat. Penggugat Defendant. The Plaintiff stated that legally
Menyatakan Secara hukum kepemilikan yang di the ownership owned by the Plaintiffs was legally
miliki oleh Para Penggugat sah secara hukum valid and entitled to compensation in the amount
dan berhak atas uang Kornpensasi sebesar of Rp368,861,000.
Rp368.861.000.
Pada tanggal 14 Desember 2023 telah dilakukan On December 14 2023, the District Court's
pembacaan Putusan Pengadilan Negeri dengan decision was read with the following ruling:
amarnya sebagai berikut:
- 195 -
Page 193
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Dalam Eksepsi In Exception
Menyatakan Eksepsi Tergugat I,II,III tidak dapat Declare that the exceptions of Defendants I, II, III
diterima cannot be accepted
Dalam Pokok Perkara In the Main Case
1. Mengabulkan gugatan para Penggugat untuk 1. Grant the Plaintiffs' lawsuit in part;
sebagian;
2. Menyatakan secara hukum Penggugat I,II,II 2. Legally declare that Plaintiffs I, II, II are the
adalah pemilik Sah atas tanah yang legal owners of the disputed land.
disengketakan.
Dalam Rekonvensi In Reconvention
Menolak gugatan rekonvensi Para Penggugat Rejecting the reconvention lawsuit of the
Rekoncensi/Tergugat I, II Rekonvensi. Reconvention Plaintiffs/Reconvention
Defendants I, II.
Dalam Konvensi dan Rekonvensi In Conventions and Reconventions
Menghukum Para Tergugat untuk membayar Sentencing the Defendants to pay court costs.
biaya perkara.
Pada tanggal 21 Maret 2024 diadakan sidang On March 21 2024, a hearing was held with the
dengan agenda pembacaan Putusan Banding agenda of reading the Appeal Decision on the a
atas Perkara a quo dengan amarnya sebagai quo case with the following ruling:
berikut :
1. Menerima permohonan banding dari Para 1. Accept the appeal request from the original
Pembanding semula Tergugat I dan Tergugat Appellants, Defendant I and Defendant II;
II tersebut;
2. Menguatkan putusan Putusan Pengadilan 2. Strengthen the decision of the Balikpapan
Negeri Balikpapan Niomor 53/Pdt.G/2023.PN District Court, Niomor 53/Pdt.G/2023.PN
Bpp, tanggal 14 Desember 2023 tersebut; Bpp, dated 14 December 2023;
3. Menghukum Para Pembanding semula 3. Sentenced the original appellants, Defendant
Tergugat I dan Tergugat II untuk membayar I and Defendant II, to pay court costs at both
biaya perkara dalam kedua tingkat peradilan, levels of justice, which at the Appellate Level
yang dalam Tingkat Banding ditetapkan was set at Rp. 150,000.-.
sejumlah Rp150.000,-.
Pada tanggal 28 Desember 2023 Tergugat II On December 28, 2023, Defendant II filed a legal
mengajukan upaya hukum Banding atas Putusan appeal against the District Court's decision in the
Pengadilan Negeri perkara a quo. a quo case.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company is still
masih menunggu upaya hukum selanjutnya dari waiting for further legal action from the Parties.
Para Pihak.
8. Gugatan Perbuatan Melawan Hukum Proyek 8. Lawsuit on Unlawful Acts of the ITC Polonia
ITC Polonia Medan Medan Project
PT ITC Polonia mengajukan gugatan ke PT ITC Polonia filed a lawsuit with the Medan
Pengadilan Negeri Medan dengan Perkara No. District Court with a case No.
279/Pdt.g/2023/PN.Mdn dengan Perusahaan 279/Pdt.g/2023/PN.Mdn with the Company as
sebagai Tergugat. Nilai Gugatan materiil yang Defendant. The material claim value was
diajukan sebesar Rp40.660.793.864 dan imateriil Rp40,660,793,864 and the immaterial claim was
sebesar Rp15.000.000.000. Rp15,000,000,000.
Pada tanggal 8 Mei 2023 diadakan sidang On May 8, 2023 a trial was held with the agenda
dengan agenda sidang pertama for the first session
Pada tanggal 27 September 2023 diadakan On September 27, 2023, a trial was held with
sidang dengan agenda saksi dari Penggugat the Plaintiff's witnesses as an agenda.
Pada tanggal 30 November 2023 diadakan On November 30, 2023, a trial was held with
sidang dengan agenda pembacaan putusan the agenda of reading the verdict with
dengan amarnya sebagai berikut : the following ruling:
1. Mengabulkan Gugatan Para Penggugat 1. Granted the Plaintiff's lawsuit in part;
untuk sebagian;
- 196 -
Page 194
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
2. Menghukum Tergugat untuk membayar 2. Sentenced the Defendant to pay material
kerugian Materiil sebesar Rp23.438.853.864 losses amounting to Rp23,438,853,864 and
dan bunga sebesar Rp36.095.834.951. interest amounting to Rp36,095,834,951.
Pada tanggal 8 Desember 2023 Perseroan On December 8, 2023, the Company submitted
mengajukan Upaya Hukum Banding atas a legal appeal against the District Court's
Putusan PN Perkara a quo. decision in the a quo case.
Pada tanggal 15 Februari 2024 dibacakan On February 15 2024, the Appeal Decision
Putusan Banding atas Putusan Pengadilan against the Medan District Court Decision was
Negeri Medan dengan amarnya sebagai berikut : read with the following ruling:
Mengadili : Judge:
- Menerima permohonan banding dari - Accept the appeal request from the original
Pembanding semula sebagai Tergugat; Appellant as Defendant;
- Membatalkan putusan Pengadilan Negeri - Cancel the decision of the Medan District
Medan No.279/Pdt.G/2023/PN.Mdn tanggal Court No.279/Pdt.G/2023/PN.Mdn dated 30
30 Nopember 2023 yang dimohonkan banding November 2023 which was requested for
tersebut. appeal.
Mengadili Sendiri: Judging:
- Menyatakan Pengadilan Negeri Medan tidak - Declare that the Medan District Court has no
berwenang mengadili perkara ini; authority to try this case;
- Menghukum Terbanding semula Penggugat - Sentenced the original Appellee, Plaintiff, to
untuk membayar biaya perkara dalam kedua pay court costs at both court levels, which for
tingkat pengadilan yang untuk Pengadilan the appellate court amounted to Rp150,000,-
tingkat banding sebesar Rp150.000,-
Pada tanggal 27 Februari 2024 diajukan Kasasi On February 27 2024, a cassation was filed
atas Putusan Banding Perkara a quo. against the appeal decision in the a quo case.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company monitors
memonitor pelaksanaan kasasi. the implementation of cassation.
9. Gugatan Pembatalan Putusan BANI Proyek 9. Lawsuit for Cancellation of BANI Decision for
ITC Polonia Medan ITC Polonia Medan Project
PT ITC Polonia mengajukan gugatan ke PT ITC Polonia filed a lawsuit with the Medan
Pengadilan Negeri Medan dengan Perkara No. District Court with a case No.
326/Pdt.g/2023/PN.Mdn dengan Perusahaan 326/Pdt.g/2023/PN.Mdn with the Company as
sebagai Tergugat. PT ITC Polonia menuntut Defendant. PT ITC Polonia demands Arbitration
Putusan Arbitrase No. 1371 B/Pdt.Sus-Arbt/2022 Award No. 1371 B/Pdt.Sus-Arbt/2022 dated 20
tanggal 20 September 2022 telah melanggar September 2022 has violated the provisions of
ketentuan Pasal 70 huruf c UU No. 30 tahun Article 70 letter c Law No. 30 Year 1999
1999 tentang Arbitrase dan Alternatif concerning Arbitration and Alternative Dispute
Penyelesaian Sengketa. Resolution.
Pada tanggal 17 Mei 2023 diadakan sidang On May 17, 2023 a trial was held with the agenda
dengan agenda sidang pertama. for the first session.
Pada tanggal 21 September 2023 diadakan On September 21, 2023, a trial was held with
sidang dengan agenda pemeriksaan bukti. the agenda of examining evidence.
Pada tanggal 5 Oktober 2023 diadakan sidang On October 5, 2023, a trial was held with
dengan agenda pembacaan putusan dengan the agenda of reading the verdict with
amarnya sebagai berikut : the following ruling:
1. Mengabulkan eksepsi para Termohon; 1. Accept the Respondents' exception;
2. Menyatakan Pengadilan Negeri Medan tidak 2. Declare that the Medan District Court has no
berwenang mengadili perkara ini; authority to try this case;
3. Menghukum Penggugat untuk membayar 3. Punish the Plaintiff to pay the court costs
biaya perkara yang timbul. incurred.
Pada tanggal 17 Oktober 2023 Penggugat On October 17, 2023, the Plaintiff appealed the a
melakukan Banding atas Putusan Perkara a quo. quo case decision.
- 197 -
Page 195
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pada tanggal 4 Desember 2023 agenda On December 4 2023, the agenda for reading the
pembacaan putusan banding dengan amarnya appeal decision will be as follows:
sebagai berikut :
1. Menerima Permohonan Banding dari Kuasa 1. Receiving the Appeal Application from the
Hukum Pembanding semula Pemohon; Appellant's original Legal Counsel;
2. Menguatkan Putusan Pengadilan Negeri atas 2. Strengthen the District Court's decision on
Perkara a quo. the a quo case.
Pada tanggal 14 Desember 2023 Penggugat On December 14, 2023, the Plaintiff carried out a
telah melakukan Upaya Hukum Kasasi atas cassation legal action against the appeal
Putusan Banding Perkara a quo. decision in the a quo case.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company monitors
memonitor pelaksanaan kasasi. the implementation of cassation.
10. Perkara Gugatan Perbuatan Melawan Hukum 10. Bocimi Toll Road Project Lawsuit Case for
Proyek Jalan Tol Bocimi Unlawful Actions
Yoerizal Tawi mengajukan gugatan ke Yoerizal Tawi filed a lawsuit at the Cibadak
Pengadilan Negeri Cibadak dengan Perkara No. District Court with Case
24/Pdt.G/2023/PN.Cbd dengan Perusahaan No.24/Pdt.G/2023/PN.Cbd with the Company as
sebagai Turut Tergugat IV. Nilai Gugatan materiil Co-Defendant IV. The value of the material
yang diajukan sebesar Rp820.150.200 dan awsuit submitted is Rp820,150,200 and
imateriil sebesar Rp2.000.000.000. the immaterial value is Rp2,000,000,000.
Pada tanggal 23 Februari 2024 diadakan sidang On February 23 2024 a hearing was held with the
dengan pembacaan Putusan Pengadilan Negeri Cibadak District Court reading the decision with
Cibadak dengan amarnya sebagai berikut: the following ruling:
Dalam Konvensi In Convention
Menolak Eksepsi yang diajukan Reject the proposed exception
Dalam Pokok Perkara In the Main Case
1. Mengabulkan gugatan sebagian; 1. Grant the lawsuit in part;
2. Menyatakan PENGGUGAT sebagai pemilik 2. Declare the PLAINTIFF as the legal owner;
yang sah;
3. Menyatakan perbuatan TERGUGAT I DAN 3. Declare the actions of ACCUSED I AND
TERGUGAT II yang telah ACCUSED II who have confessed/claimed to
mengaku/mengklaim miliki objek sengketa own the object of the land dispute in the a quo
tanah perkara a quo adalah sebagai case as an unlawful act (onrechtmatigedaad)
perbuatan melawan hukum which is very detrimental to the PLAINTIFF.
(onrechtmatigedaad) yang sangat merugikan
PENGGUGAT.
Menghukum PARA TURUT TERGUGAT untuk Punish the CO-DEFENDANTS to submit and
tunduk dan patuh pada putusan; comply with the decision;
Pada tanggal 8 Maret 2024 Tergugat Melakukan On March 8 2024, the Defendant took legal
Upaya Hukum Banding atas Putusan Pengadilan action to appeal the decision of the Cibadak
Negeri Cibadak. District Court.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company is still
masih memonitor upaya hukum banding monitoring further legal appeals.
selanjutnya.
11. Perkara Gugatan PKPU PT Bukaka Teknik 11. PT Taraindo Energi Perkasa PKPU
Utama Application Case
PT Bukaka Teknik Utama sebagai pemohon PT Bukaka Teknik Utama as the applicant
mengajukan permohonan Penundaan Kewajiban submitted a request for Postponement of Debt
Pembayaran Utang dengan Perkara No. 390 Payment Obligations in Case No. 390
/Pdt.Sus.PKPU/2023/PN.Niaga.Jkt.Pst dengan /Pdt.Sus.PKPU/2023/PN.Niaga.Jkt.Pst with
Perusahaan sebagai Termohon. Nilai the Company as Respondent. The value of
Permohonan Pemohon PKPU sebesar the PKPU applicant's application is
Rp136.878.032.223. Rp136,878,032,223.
- 198 -
Page 196
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pada tanggal 21 Maret 2024 diadakan sidang On March 21 2024, a hearing was held with the
dengan agenda Penyerahan Kesimpulan. agenda for Submitting Conclusions.
Sampai dengan tanggal pelaporan Perusahaan As of the reporting date, the Company is still
masih memonitor pelaksanaan sidang monitoring the implementation of the next trial.
selanjutnya.
57. SIFAT DAN TRANSAKSI PIHAK-PIHAK BERELASI 57. NATURE AND TRANSACTIONS WITH RELATED
PARTIES
Sifat hubungan berelasi Nature of Relationship
a. Pemerintah Republik Indonesia melalui a. The Government of the Republic of Indonesia
Kementerian Keuangan adalah pemegang represented by the Ministry of Finance, is
saham utama Perusahaan. the Company’s main shareholder.
b. Seluruh entitas yang dimiliki dan dikendalikan b. All entities that are owned and controlled by
oleh Kementerian Keuangan Pemerintah the Ministry of Finance of the Republic of
Republik Indonesia serta entitas dimana Indonesia including entities where the Ministry of
Kementerian Keuangan Pemerintah Republik Finance Republic of Indonesia have significant
Indonesia memiliki pengaruh signifikan: Badan influence: State-owned Enterprise (SOE).
Usaha Milik Negara (BUMN).
c. Pihak berelasi yang pemegang saham utamanya c. Related parties which main shareholder is
sama dengan Grup. the same with the Group.
d. Pihak berelasi yang merupakan Perusahaan d. Related parties which are associates of
asosiasi dari entitas anak. the Company’s subsidiaries.
e. Manajemen kunci yang meliputi anggota dewan e. Key management personnel includes
Komisaris dan Direksi Perusahaan. Commissioners and Directors of the Company.
Transaksi pihak berelasi Transactions with related parties
Berikut ini adalah transaksi dengan entitas berelasi: The following are transactions with related parties:
Pihak-pihak Berelasi/ Related Parties Transaksi Transactions
PT Bank Negara Indonesia (Persero) Tbk Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Panjang, Bank Cash and Cash Equivalent, Short Term Investments, Long Term Bank Loan, Bank
Garansi/LC/SKBDN Guarantee/LC/SKBDN
PT Bank Rakyat Indonesia (Persero) Tbk Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Panjang, Bank Cash and Cash Equivalent, Short Term Investments, Long Term Bank Loan, Bank
Garansi/LC/SKBDN Guarantee/LC/SKBDN
PT Bank Tabungan Negara (Persero) Tbk Kas dan Setara Kas, Utang Bank Jangka Panjang, Investasi Jangka Pendek, Utang Bank Cash and Cash Equivalent, Long Term Bank Loan, Short Term Investments, Long Term
Jangka Pendek Bank Loan
PT Bank Mandiri (Persero) Tbk Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Panjang, Bank Cash and Cash Equivalent, Short Term Investments, Long Term Bank Loan, Bank
Garansi/LC/SKBDN Guarantee/LC/SKBDN
PT Bank Syariah Indonesia Tbk (d/h/ formerly Kas dan Setara Kas, Supply Chain Financing Cash and Cash Equivalent, Supply Chain Financing
PT Bank Syariah Mandiri)
PT Bank Syariah Indonesia Tbk (d/h/ formerly Kas dan Setara Kas, Utang Bank Jangka Panjang, Supply Chain Financing Cash and Cash Equivalent, Long Term Bank Loan, Supply Chain Financing
PT Bank BNI Syariah)
Indonesia Eximbank Kas dan Setara Kas, Bank Garansi/LC/SKBDN Cash and Cash Equivalent, Bank Guarantee/LC/SKBDN
PT Bank Syariah Indonesia Tbk (d/h/ formerly Kas dan Setara Kas, Utang Bank Jangka Panjang Cash and Cash Equivalent, Long Term Bank Loan
PT Bank BRI syariah Tbk)
PT Bank Tabungan Negara Syariah Kas dan Setara Kas Cash and Cash Equivalent
PT Bank Mandiri Taspen Kas dan Setara Kas Cash and Cash Equivalent
PT Trans Jawa Paspro Jalan Tol Piutang Usaha, Piutang Retensi, Tagihan Bruto Accounts Receivable, Retention Receivable, Gross Amount due to from Customer, Trade
Receivable
PT Jasamarga Solo Ngawi Piutang Lain-lain, Piutang Retensi Others Receivable, Retention Receivable
PT Pejagan Pemalang Tol Road Piutang Lain-lain, Piutang Retensi Others Receivable, Retention Receivable
PT Hutama Karya (Persero) Piutang Usaha, Piutang Lain-lain, Piutang Retensi, Tagihan Bruto, Piutang Dagang Accounts Receivable, Others Receivable, Retention Receivable, Gross Amount due to from
Customer
PT Kertas Leces (Persero) Piutang Usaha Accounts Receivable
PT Istaka Karya (Persero) Piutang Usaha, Piutang Lain-lain Accounts Receivable, Others Receivable
PT Perusahaan Listrik Negara (Persero) Tagihan Bruto, Piutang Lain-lain, Pendapatan, Piutang Usaha Gross Amount due to from Customer, Others Receivable, Revenues, Accounts Receivable
KSO/JO Waskita - Arkitek Team Empat Piutang Ventura Bersama Joint Ventures Receivables
KSO/JO Waskita - Adhi Investasi pada Ventura Bersama, Piutang Ventura Bersama Investment in Joint Ventures, Joint Ventures Receivables
KSO/JO Waskita - Wika Investasi pada Ventura Bersama, Piutang Ventura Bersama Investment in Joint Ventures, Joint Ventures Receivables
Waskita - HK - BRP Piutang Ventura Bersama, Investasi pada Ventura Bersama Joint Ventures Receivables, Investment in Joint Ventures
Waskita - Baswara Sinar Mulia Piutang Ventura Bersama Joint Ventures Receivables
KSO/JO Hutama - Waskita Piutang Dagang, Investasi pada Ventura Bersama Trade Receivable, Investment in Joint Ventures
PT Pembangunan Perumahan (Persero) Tbk Piutang Dagang Trade Receivable
KSO/JO WKR - Asiana Senopati Piutang Lain-lain Others Receivable
PT Jasamarga Semarang Batang Pendapatan Revenues
PT Cinere Serpong Jaya Tagihan Bruto, Pendapatan, Piutang Retensi, Piutang Usaha Gross Amount due to from Customer, Revenues, Retention Receivable, Accounts
Receivable
KSO/JO WKR - Darmo Permai Piutang Lain-lain, Investasi pada Ventura Bersama Others Receivable, Investment in Joint Ventures
PT Prima Multi Terminal Piutang Lain-lain, Investasi Jangka Panjang Lainnya Others Receivable, Other Long-term Investments
PT Hutama Marga Waskita Tagihan Bruto, Piutang Usaha, Investasi Jangka Panjang Lainnya Gross Amount due to from Customer, Accounts Receivable, Other Long-term Investments
PT Jasamarga Japek Selatan Piutang Usaha, Piutang Retensi, Tagihan Bruto, Pendapatan Accounts Receivable, Retention Receivable, Gross Amount due to from Customer,
Revenues
PT Jasamarga Jalan Layang Cikampek Piutang Retensi Retention Receivable
PT Bukit Asam (Persero) Tbk Piutang Retensi Retention Receivable
PT Angkasa Pura I (Persero) Tagihan Bruto, Piutang Usaha, Pendapatan Gross Amount due to from Customer, Accounts Receivable
PT Angkasa Pura II (Persero) Tagihan Bruto, Piutang Retensi, Piutang Usaha, Pendapatan Gross Amount due to from Customer, Retention Receivable, Accounts Receivable,
Revenue
PT Sarana Multi Infrastruktur (Persero) Lembaga Keuangan Non Bank Loan to Financial Institution Non Bank
KSO/JO Waskita - Brantas Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/JO Waskita - HK Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/JO Waskita - PP Investasi pada Ventura Bersama Investment in Joint Ventures
- 199 -
Page 197
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Pihak-pihak Berelasi/ Related Parties Transaksi Transactions
KSO/JO Wika - Waskita - Nindya Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/JO Wika - Waskita Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/JO Waskita - PP - Wika Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/ JO Waskita - Nindya Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/ JO WKR - RNI Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Yodya Karya Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Wika - PP - HK Investasi pada Ventura Bersama Investment in Joint Ventures
Waskita - Amarta Investasi pada Ventura Bersama Investment in Joint Ventures
PT Dok dan Perkapalan Kodja Bahari (Persero) Piutang Usaha Accounts Receivable
PT Kresna Kusuma Dyandra Marga Piutang Usaha, Piutang Dagang, Tagihan Bruto, Piutang Lain-lain, Piutang Retensi, Accounts Receivable, Trade Receivable, Gross Amount due to from Customer, Others
Pendapatan, Uang Muka Kontrak Jangka Pendek, Investasi pada Ventura Bersama Receivable, Retention Receivable, Revenues, Advances on Short-Term, Investment in Joint
Ventures
Perum Bulog Tagihan Bruto, Pendapatan, Piutang Usaha Gross Amount due to from Customer, Revenues, Account Receivable
PT Hakaaston Piutang Dagang, Pendapatan, Utang Usaha Trade Receivable, Revenues, Accounts Payable
PT Pelabuhan Indonesia III Piutang Usaha, Uang Muka Kontrak Jangka Panjang, Pendapatan Accounts Receivable, Advances on Long-Term, Revenue
PT Cibitung Tanjung Priok Port Toll Ways Tagihan Bruto, Pendapatan, Piutang Retensi, Piutang Dagang, Piutang Usaha Gross Amount due to from Customer, Revenues, Retention Receivable, Trade Receivable,
Accounts Receivable
PT Citra Karya Jabar Tol Tagihan Bruto, Piutang Usaha Gross Amount due to from Customer, Accounts Receivable
PT Cimanggis Cibitung Tollways Piutang Usaha, Piutang Lain-lain, Piutang Retensi, Tagihan Bruto, Pendapatan, Piutang Accounts Receivable, Others Receivable, Retention Receivable, Gross Amount due to from
Dagang Customer, Revenues, Trade Receivable
PT Marga Trans Nusantara Piutang Retensi Retention Receivable
PT Rafflesia Investasi Indonesia Piutang Lain-lain Others Receivable
PT Len Industri Utang Usaha, Utang Bruto Accounts Payable,Short-Term Gross Amount Due to Subcontractors
PT Krakatau Steel Utang Usaha Accounts Payable
PT Wijaya Karya Beton Utang Usaha, Utang Bruto Accounts Payable,Short-Term Gross Amount Due to Subcontractors
PT Pelabuhan Indonesia III Tagihan Bruto, Pendapatan Gross Amount due to from Customer, Revenue
PT Marga Trans Nusantara Piutang Retensi Retention Receivable
KSO/ JO Waskita - Agung Piutang Dagang Trade Receivable
KSO/ JO Adhi - Minarta Piutang Dagang Trade Receivable
PT Asuransi Jiwasraya (Persero) Piutang Lain-lain Others Receivable
KSO/JO Waskita - Vision First Piutang Lain-lain Others Receivable
Indonesia Investment Authority (INA) Piutang Lain-lain Others Receivable
KSO/JO Waskita - Abipraya Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/JO Waskita - Nindya - Permata Investasi pada Ventura Bersama Investment in Joint Ventures
KSO/JO Waskita - Nindya - LRS Investasi pada Ventura Bersama Investment in Joint Ventures
Rincian item yang terkait dengan transaksi pihak- The details of items associated with the related
pihak yang berelasi sebagai berikut: parties transaction are as follows:
31 Maret/ 31 Desember/ 31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023 March 31, 2024 December 31, 2023
Rp Rp % %
Aset Assets
Kas dan Setara kas 2.717.708.882.620 1.200.126.034.753 2,95% 1,26% Cash and Cash Equivalents
Piutang Usaha 2.537.673.151.380 1.128.731.788.636 2,75% 1,18% Accounts Receivable
Piutang Retensi 1.319.886.623.755 1.213.958.889.589 1,43% 1,27% Retention Receivable
Piutang Lain-lain 10.550.140.811.892 9.819.820.899.990 11,44% 10,27% Others Receivable
Tagihan Bruto 3.439.081.016.136 3.322.024.421.101 3,73% 3,48% Gross Amount due to from Customer
Aset Ventura Bersama 1.927.783.740.548 406.721.211.901 2,09% 0,43% Joint Ventures Assets
Persentase di atas merupakan perbandingan dengan The percentage above is a comparison with the total
jumlah aset. of assets.
31 Maret/ 31 Desember/ 31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023 March 31, 2024 December 31, 2023
Rp Rp % %
Liabilitas Liabilities
Utang Bank 25.615.293.911.332 27.578.068.100.394 31,40% 32,83% Bank Loan
Uang Muka Kontrak 184.722.802.528 19.935.386.402 0,23% 0,02% Advance on Contract
Persentase di atas merupakan perbandingan dengan The percentage above is a comparison with the total
jumlah liabilitas. of liabilities.
31 Maret / March 31, 31 Maret / March 31,
2024 2023 2024 2023
Rp Rp % %
Pendapatan Usaha 781.855.744.172 776.699.642.061 35,90% 28,43% Revenue
Persentase di atas merupakan perbandingan dengan The percentage above is a comparison with the total
jumlah pendapatan. of revenue.
58. PERJANJIAN 58. AGREEMENTS
a. Kontrak Konstruksi a. Construction Contract
Pada tanggal 31 Desember 2023, berikut As of December 31, 2023 following the details of
perikatan dan perjanjian dalam rangka aktivitas commitments and agreement related to
konstruksi: construction activity:
- 200 -
Page 198
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Jangka Waktu/ Time Period
Nilai Kontrak/ Pemberi Kerja/ Mulai/ Selesai/ Keterangan/
No. Nama Proyek/ Project Name Nomor Kontrak/ Contract Number Contract Value Owner Start Finish Remark
Addendum Dalam
1 Jalan Tol Kayu Agung - Palembang - Betung Paket II Seksi 1 01/ADD/Kontrak.S1.S2.S3-WK/2022 3.979.452.524.000 PT Waskita Sriwijaya Tol 30-Mei-16 31-Agu-23 Proses/ Addendum in
Process
Addendum Dalam
2 Pembangunan Twin Tower Makassar 011/PJA-PT.SCI/DB-TTM/11/2020 1.728.686.086.000 PT Sulses Citra Indah (Perseroda) 04-Nov-20 15-Apr-23 Proses/ Addendum in
Process
Kementerian Pekerjaan Umum dan
Belum Jatuh Tempo/
3 Bendungan Jragung Paket 1 KU 03.01/Ao.8.2/IX/01/AD-V 733.024.019.131 Perumahan Rakyat/ The Ministry of Public 14-Okt-20 31-Des-24
Not Due Yet
Works and Housing
Kementerian Pekerjaan Umum dan
Belum Jatuh Tempo/
4 Bendungan Rukoh Paket II HK.01.02/Bws1.8.3/225 595.368.766.619 Perumahan Rakyat/ The Ministry of Public 31-Des-18 29-Des-24
Not Due Yet
Works and Housing
Kementerian Pekerjaan Umum dan Addendum Dalam
HK.02.03/PKK/PPK.BEND.II/2023/01.Ad
5 Proyek Pembangunan Bendungan Bener Paket II 570.737.916.049 Perumahan Rakyat/ The Ministry of Public 29-Okt-18 30-Des-23 Proses/ Addendum in
d.XIII
Works and Housing Process
Kementerian Pekerjaan Umum dan Addendum Dalam
6 Bendungan Jlantah (65%) Hk.02.03-An/PPKBI/JLT/Add.12/12 570.259.894.918 Perumahan Rakyat/ The Ministry of Public 26-Jul-19 30-Des-23 Proses/ Addendum in
Works and Housing Process
Kementerian Pekerjaan Umum dan
Belum Jatuh Tempo/
7 Rentang Irrigation Modernization Project HK.02.03-At/3.3/32/Add.IX 553.997.191.671 Perumahan Rakyat/ The Ministry of Public 19-Agu-20 17-Feb-24
Not Due Yet
Works and Housing
Addendum Dalam
8 Tol Kamal – Teluknaga – Rajeg – Balaraja (Kataraja) DGK/PO/01/22/00001 1.050.433.919.000 PT Duta Graha Karya 20-Jan-22 11-Nov-23 Proses/ Addendum in
Process
Kementerian Pekerjaan Umum dan
HK.02.03/SNVT/PB.II Belum Jatuh Tempo/
9 Bendungan Mbay JOP 70% 441.878.986.421 Perumahan Rakyat/ The Ministry of Public 19-Agu-21 31-Des-24
BWS.NT.II/KB/013/I/2023 Not Due Yet
Works and Housing
Kementerian Pekerjaan Umum dan Addendum Dalam
10 Bangunan Pengarah Bendungan Rukoh PB.02.01-Bws1.8.2/722 415.192.000.000 Perumahan Rakyat/ The Ministry of Public 09-Sep-21 27-Nov-23 Proses/ Addendum in
Works and Housing Process
Addendum Dalam
11 PLTM Batang Toru 3 001/TGRA-WSKT/EPC/IV/2021 377.250.000.000 PT Energi Alam Sentosa 14-Jan-21 14-Apr-23 Proses/ Addendum in
Process
Kementerian Pekerjaan Umum dan Addendum Dalam
12 Pengendalian Banjir Sungai Loji-Banger I 06/ADD/KU.03.01/Ao.7.2/KNT/07/2021 251.318.181.381 Perumahan Rakyat/ The Ministry of Public 04-Okt-21 31-Des-23 Proses/ Addendum in
Works and Housing Process
Addendum Dalam
13 Jalan Tol Kayu Agung - Palembang - Betung Paket IV Seksi 2A 02/ADD/Kontrak S2.S3-WK/2022 249.050.259.246 PT Waskita Sriwijaya Tol 20-Des-16 31-Agu-23 Proses/ Addendum in
Process
Kementerian Pekerjaan Umum dan
Belum Jatuh Tempo/
14 Proyek Makassar Sewerage B2 HK.01.02-Cb29.5.2/Add-X/2023/49 263.811.924.000 Perumahan Rakyat/ The Ministry of Public 14-Nov-19 26-Jan-24
Not Due Yet
Works and Housing
Addendum Dalam
HK0201/KONTRAK/SATKER-PPP- PUPR Cipta Karya Balai Prasarana
15 Jambi Sewer Sistem B2 227.392.201.000 09-Okt-20 06-Mar-23 Proses/ Addendum in
JBI/PLP/5 Permukiman Wilaya
Process
Kementerian Pekerjaan Umum dan Addendum Dalam
16 Pengaman Pantai KEK Tanjung Lesung HK.02.03/09-ADD II/APBN/SP.II/2021 227.194.050.000 Perumahan Rakyat/ The Ministry of Public 30-Nov-20 15-Nov-23 Proses/ Addendum in
Works and Housing Process
Addendum Dalam
17 PLTM Sisira 2 x 4,9 Mw 001/TGRA-WSKT/EPC/IV/2021 225.500.000.000 PT Energi Alam Sentosa 14-Apr-21 14-Apr-23 Proses/ Addendum in
Process
Kementerian Pekerjaan Umum dan Addendum Dalam
18 Proyek Makassar Sewerage C2 HK.02.03/Cb29.5.2/Add-V/2021/02 149.830.540.000 Perumahan Rakyat/ The Ministry of Public 10-Jan-20 02-Sep-23 Proses/ Addendum in
Works and Housing Process
Belum Jatuh Tempo/
19 Probolinggo - Banyuwangi Paket 3 JOP 25% 021/KONTRSK/2023 996.821.538.288 Jasamarga Probolinggo Banyuwangi 12-Jun-23 12-Des-24
Not Due Yet
Addendum Dalam
20 Akses Jalan Tol Japek Selatan (Deltamas) 046/KONTRAK-DIR.JJS/2023 100.900.000.000 PT Puradelta Lestari 26-Jun-23 23-Des-23 Proses/ Addendum in
Process
Addendum Dalam
21 Revetment, Retaining Wall ,Dermaga Benoa PD.01/27/6/1/SPGD/PMO5/PLND-23 383.206.703.782 PT Pelabuhan Indonesia (Persero) 30-Apr-21 26-Sep-23 Proses/ Addendum in
Process
Belum Jatuh Tempo/
22 Road from Tono-Noefefan Bridge to Oenuno 45/2022/PA/REAOA-ZEESM 322.891.938.812 ZEESM TL 19-Agu-22 18-Mar-24
Not Due Yet
Belum Jatuh Tempo/
23 Tono Market Oesilo Border Road 59/2023/PA/REAOA-ZEESM 513.253.663.000 ZEESM TL 16-Mei-23 05-Mei-25
Not Due Yet
b. Kontrak Konsesi Pengusahaan Jalan Tol b. Concession Toll Road Right Contract
Perusahaan/ Ruas Tol/ Mitra Kerja/ Isi Perjanjian/ Jangka Waktu/ Period
No
The Company Toll Section Partners Content of the Agreement Mulai/ Start Selesai/ Finish
1 PT Trans Jabar Tol (TJT) Ciawi - Sukabumi Kementerian Pekerjaan Umum dan Hak konsesi pengusahaan jalan tol selama 45 2015 2060
Perumahan Rakyat/ The Ministry of tahun/ Toll road concession rights for 45
Public Works and Housing years
2 PT Pemalang Batang Toll Road Pemalang - Batang Kementerian Pekerjaan Umum dan Hak konsesi pengusahaan jalan tol selama 50 2017 2067
(PBTR) Perumahan Rakyat/ The Ministry of tahun/ Toll road concession rights for 50
Public Works and Housing years
3 PT Waskita Sriwijaya Tol (WST) Kayu Agung - Kementerian Pekerjaan Umum dan Hak konsesi pengusahaan jalan tol selama 50 2017 2067
Palembang - Betung Perumahan Rakyat/ The Ministry of tahun/ Toll road concession rights for 50
Public Works and Housing years
4 PT Waskita Bumi Wira (WBW) Krian - Legundi - Kementerian Pekerjaan Umum dan Hak konsesi pengusahaan jalan tol selama 50 2016 2066
Bunder - Manyar Perumahan Rakyat/ The Ministry of tahun/ Toll road concession rights for 50
Public Works and Housing years
5 PT Tol Transjawa Paspro Jalan Tol Pasuruan - Kementerian Pekerjaan Umum dan Hak konsesi pengusahaan jalan tol selama 50 2011 2061
Probolinggo Perumahan Rakyat/ The Ministry of tahun/ Toll road concession rights for 50
Public Works and Housing years
59. MANAJEMEN RISIKO KEUANGAN 59. FINANCIAL RISK MANAGEMENT
Dalam pengelolaan keuangan, Grup telah melakukan In financial management, the Group has conducted
analisa risiko terhadap persaingan dan a risk analysis on competition and uncertainties that
ketidakpastian yang dapat berpengaruh pada aset could affect the financial assets and financial
keuangan dan liabilitas keuangan sebagai berikut: liabilities as follows:
- 201 -
Page 199
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
a. Klasifikasi Aset dan Liabilitas Keuangan a. Classifications of Financial Assets and Liabilities
Perbedaan nilai wajar dengan nilai tercatat pada The difference between the fair value and
31 Maret 2024 dan 31 Desember 2023 tidak the carrying value at March 31, 2024 and
signifikan. December 31, 2023 was not significant.
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Aset Keuangan - pada Financial Assets - at
Biaya Perolehan diamortisasi Amortiozed Cost
Kas dan Setara Kas 2.850.737.198.629 1.340.065.112.240 Cash and Equivalents Cash
Kas yang Dibatasi Penggunaannya 5.414.655.123.996 6.698.167.060.090 Restricted Cash
Investasi Jangka Pendek 8.448.200.000 8.448.200.000 Short-Term Investments
Piutang Usaha 2.902.211.978.698 1.650.323.580.610 Accounts Receivable
Piutang Retensi 1.589.096.422.159 1.490.267.616.686 Retention Receivable
Piutang Lain-lain 10.600.617.548.040 9.872.580.331.665 Other Receivables
Piutang Ventura Bersama 349.245.025.036 360.741.426.135 Joint Ventures Receivables
Tagihan Bruto kepada Pengguna Jasa 4.842.249.852.218 4.496.709.067.451 Gross Amount Due from Customers
Aset Keuangan atas Proyek Konsesi 236.292.189.256 244.153.323.372 Financial Assets from Concession Project
Aset Keuangan yang Dimiliki untuk diperdagangkan For Trading Financial Assets
Investasi Jangka Panjang Lainnya 869.738.189.820 869.738.189.820 Other Long-Term Investments
Jumlah 29.663.291.727.852 27.031.193.908.069 Total
Liabiltas Keuangan - pada Financial Liabilities - at
Biaya perolehan diamortisasi Amortized cost
Utang Usaha 5.917.034.460.253 5.661.220.681.629 Accounts Payables
Utang Bruto Subkontraktor 1.597.789.777.479 1.687.713.369.915 Gross Amount Due to Third Parties
Utang Bank 46.118.710.902.092 47.839.189.027.957 Bank Loan
Utang Lembaga Keuangan Non-Bank 5.991.097.743.251 5.785.277.386.796 Loan to Financial Institution Non-Bank
Biaya yang Masih Harus Dibayar 3.277.988.617.372 3.326.419.315.615 Accrued Expenses
Utang Ventura Bersama 1.430.792.639.368 1.332.247.776.159 Joint Venture Payable
Utang Obligasi 8.833.806.533.821 8.828.624.933.131 Bonds Payable
Surat Utang Jangka Menengah 750.569.423.217 735.727.511.026 Medium Term Notes
Utang Lain-lain - Jangka Panjang 302.981.024.836 310.522.632.588 Other Payables - Long Term
Jumlah 74.220.771.121.689 75.506.942.634.816 Total
b. Tujuan dan Kebijakan Manajemen Risiko b. Financial Risk Management Objectives and
Keuangan Policies
Bisnis Grup mencakup aktivitas pengambilan The Group's business includes risk-taking
risiko dengan sasaran tertentu dengan activities with specific objectives with
pengelolaan yang profesional. Fungsi utama dari professional management. The main function of
manajemen risiko Grup adalah untuk the Group's risk management is to identify all key
mengidentifikasi seluruh risiko kunci, mengukur risks, measure these risks and manage risk
risiko-risiko ini dan mengelola posisi risiko. Grup positions. The Group regularly reviews policies
secara rutin menelaah kebijakan dan sistem and risk management system to adjust to
manajemen risiko untuk menyesuaikan dengan changes in markets, products and best market
perubahan di pasar, produk dan praktek pasar practices.
terbaik.
Grup mendefinisikan risiko keuangan sebagai The Group defines financial risk as the possibility
kemungkinan kerugian atau laba yang hilang, of loss or lost profit, caused by both internal and
yang disebabkan oleh faktor internal maupun external factors that potentially have a negative
faktor eksternal yang berpotensi negatif terhadap impact on the achievement of Group goals.
pencapaian tujuan Grup.
Tujuan Grup dalam mengelola risiko keuangan The purpose of the Group in managing financial
adalah untuk mencapai keseimbangan yang risks is to achieve an appropriate balance
sesuai antara risiko dan tingkat pengembalian between risk and returns and minimize potential
serta meminimalisasi potensi efek memburuknya adverse effects of the Group's financial
kinerja keuangan Grup. performance.
Risiko keuangan utama yang dihadapi Grup The main financial risks facing the Group are
adalah risiko kredit, risiko suku bunga, risiko credit risk, interest rate risk, liquidity risk, foreign
likuiditas, risiko nilai tukar mata uang asing dan currency exchange rates and the risk of changes
risiko perubahan kebijakan pemerintah, kondisi in government policy, socio-economic and
ekonomi dan sosial politik. Perhatian atas political conditions. Attention to risk management
pengelolaan risiko ini telah meningkat secara has increased significantly and considered
signifikan dengan mempertimbangan perubahan changer and volatility of financial markets in
dan volatilitas pasar keuangan di Indonesia dan Indonesia and internationally.
internasional.
- 202 -
Page 200
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
i. Risiko Kredit i. Credit Risk
Risiko kredit adalah kerugian yang timbul Credit risk is the loss arising from customers
dari pelanggan yang gagal memenuhi who fail to meet their contractual obligations.
kewajiban kontraktual mereka.
Instrumen keuangan Grup yang mempunyai The Group's financial instruments that have
potensi atas risiko kredit terdiri dari kas dan the potential for credit risk consist of cash
setara kas, piutang usaha, piutang retensi, and cash equivalents, accounts receivable,
tagihan bruto dan piutang lain-lain. Jumlah retention, gross amount due from customers
eksposur risiko kredit maksimum sama and other receivables. Total maximum credit
dengan nilai tercatat atas akun-akun risk exposure equal to the carrying value of
tersebut. Rincian umur piutang usaha dapat these accounts. The aging of trade
dilihat pada Catatan dalam laporan receivables can be seen on notes to
keuangan konsolidasian. Pada tanggal 31 consolidated financial statements. On March
Maret 2024 dan 31 Desember 2023 piutang 31, 2024 and December 31, 2023 accounts
usaha Grup tidak terkonsentrasi pada receivable of the Group is not concentrated
pelanggan tertentu. on a particular customer.
Grup mengelola risiko kredit dengan The Group manages credit risk by setting
menetapkan batasan jumlah risiko yang dapat limits of acceptable risk for each customer
diterima untuk masing-masing pelanggan dan and be more selective in the choice of banks
lebih selektif dalam pemilihan bank dan and financial institutions, that is, only banks
institusi keuangan, yaitu hanya bank-bank dan and financial institutions are predicated
institusi keuangan ternama dan yang famous and well chosen.
berpredikat baik yang dipilih.
ii. Risiko Suku Bunga ii. Interest Rate Risk
Risiko tingkat bunga arus kas adalah risiko Cash flow interest rate risk is the risk that
dimana arus kas masa depan dari suatu future cash flows of a financial instrument
instrumen keuangan berfluktuasi karena fluctuate due to changes in market interest
perubahan suku bunga pasar. Grup memiliki rates. The Group has short-term loans with
pinjaman jangka pendek dengan bunga floating interest. The interest rate that are
mengambang. Tingkat suku bunga yang cukup quite high and occurs suddenly can effect
tinggi dan terjadi secara tiba-tiba dapat the decline in the Group’s income.
berpengaruh terhadap menurunnya laba Grup.
Berikut ini merupakan rincian dari liabilitas The following is a breakdown of financial
keuangan berdasarkan jenis tingkat suku liabilities based on the type of interest rate:
bunga:
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Liabilitas Keuangan Financial Liabilities
Suku bunga mengambang 700.127.052.202 720.631.167.369 Floating Interest Rate
Analisis sensitivitas suku bunga Interest rate sensitivity analysis
Analisis sensitivitas di bawah ini telah The sensitivity analysis below have been
ditentukan berdasarkan eksposur suku bunga determined based on the exposure to interest
untuk kedua instrumen derivatif dan non- rates for both derivatives and non-derivative
derivatif pada akhir periode pelaporan. Untuk instruments at the end of the reporting period.
liabilitas tingkat bunga mengambang, analisis For floating rate liabilities, the analysis is
tersebut disusun dengan asumsi jumlah prepared assuming the amount of the payable
liabilitas terutang pada akhir periode pelaporan liability at the end of the reporting period will
itu terutang sepanjang tahun. Kenaikan atau remain for the whole year. A 0.5 basis points
penurunan 0,5 basis poin digunakan ketika increase or decrease is used when reporting
melaporkan risiko suku bunga secara internal interest rate risk internally to key management
kepada karyawan kunci dan merupakan personnel and represents management's
penilaian manajemen terhadap perubahan assessment of the reasonably possible change
yang mungkin terjadi pada suku bunga. in interest rates.
Jika suku bunga lebih tinggi/ rendah 50 basis If interest rates had been 50 basis points
poin dan semua variable lainnya tetap higher/ lower and all other variables were
- 203 -
Page 201
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
konstan, laba pada tanggal 31 Maret 2024 held constant, profit as of December 31,
dan 31 Desember 2023 akan turun/ naik 2023 and December 31, 2023 would
masing-masing sebesar Rp314.197.245.087 decrease/ increase by Rp314,197,245,087
dan Rp321.669.999.832. Hal ini terutama and Rp 321,669,999,832 respectively. This
disebabkan oleh eksposur Grup terhadap is mainly attributable to the Group’s
suku bunga atas pinjamannya dengan suku exposure to interest rates on its floating rate
bunga mengambang. borrowings.
iii. Risiko Likuiditas iii. Liquidity Risk
Risiko likuiditas adalah risiko di mana posisi Liquidity risk is the risk in which the positions
arus kas menunjukkan pendapatan jangka of cash flows show short-term revenues are
pendek tidak cukup untuk menutupi not sufficient to cover short- term expenses.
pengeluaran jangka pendek.
Eksposur risiko likuiditas berupa kesulitan Liquidity risk is an exposure of the Group
Grup dalam memenuhi kewajiban keuangan difficulties in meeting financial obligations
yang harus dibayar dengan kas atau aset that must be paid with cash or other financial
keuangan lainnya. Grup diharapkan dapat assets. The Group is expected to pay all its
membayar seluruh kewajibannya sesuai obligations in accordance with contractual
dengan jatuh tempo kontraktual. Dalam maturities. In fulfilling this obligation,
memenuhi liabilitas tersebut, maka Grup harus the Group must generate sufficient cash
menghasilkan arus kas masuk yang cukup. inflows.
Berikut ini merupakan liabilitas keuangan These are non-derivative financial liabilities
non-derivatif berdasarkan nilai sisa jatuh based on residual maturity value which was
tempo yang tidak didiskonto: not discounted:
31 Maret / March 31, 2024
Tingkat bunga rata-rata
tertimbang efektif/ < 1 Tahun/ >1-2 Tahun/ >2-3 Tahun/ >3 Tahun/ Jumlah/ Biaya Emisi/ Nilai Tercatat/
Weighted average < 1 Year >1-2 Years >2-3 Years >3 Years Total Issuance Costs Carrying Amount
effective interest rate Rp Rp Rp Rp Rp Rp Rp
Tanpa Bunga Non-interest bearing
Utang Usaha -- 4.088.310.901.796 1.572.702.260.273 256.021.298.184 -- 5.917.034.460.253 -- 5.917.034.460.253 Accounts Payable
Utang Bruto Subkontraktor -- 1.122.180.227.428 475.609.550.051 -- -- 1.597.789.777.479 -- 1.597.789.777.479 Gross Amount Due to Subcontractors
Biaya yang Masih Harus Dibayar -- 3.277.988.617.372 -- -- -- 3.277.988.617.372 -- 3.277.988.617.372 Accrued Expenses
Liabilitas Sewa Guna Usaha -- 3.953.575.127 14.767.797.617 -- -- 18.721.372.744 -- 18.721.372.744 Lease Liabilities
Utang Ventura Bersama -- -- 1.430.792.639.368 -- -- 1.430.792.639.368 -- 1.430.792.639.368 Joint Venture Payable
Utang Lain-lain Jangka Panjang -- -- 302.981.024.836 -- -- 302.981.024.836 -- 302.981.024.836 Other Long-Term Payables
Instrumen tingkat bunga variabel Variable interest rate instrument
Utang Lembaga Keuangan Non Bank 10,50 -- 5.991.097.743.251 -- -- 5.991.097.743.251 -- 5.991.097.743.251 Loan to Financial Institution Non Bank
Instrumen suku bunga tetap Fixed interest rate instruments
Utang Bank Jangka Pendek 0 - 11 700.127.052.202 -- -- -- 700.127.052.202 -- 700.127.052.202 Short-Term Bank Loans
Utang Bank Jangka Panjang 5,40 - 5,50 1.130.038.805.835 24.476.857.421.146 -- 19.811.687.622.909 45.418.583.849.890 -- 45.418.583.849.890 Long-Term Bank Loans
Surat Utang Jangka Menengah 10 250.000.000.000 500.569.423.217 -- -- 750.569.423.217 -- 750.569.423.217 Medium Term Notes
Utang Obligasi 6,10 - 11,10 4.715.500.000.000 233.505.499.849 -- 3.900.300.000.000 8.849.305.499.849 (15.498.966.028) 8.833.806.533.821 Bonds Payable
Sukuk Mudharabah 6,10 - 11,10 -- -- -- 1.148.100.000.000 1.148.100.000.000 (2.835.584.954) 1.145.264.415.046 Sukuk Mudharabah
Liabilitas Jangka Pendek Lainnya -- 865.538.794.605 -- -- -- 865.538.794.605 -- 865.538.794.605 Other Short-Term Liabilities
Jumlah Liabilitas Keuangan 16.153.637.974.365 34.998.883.359.608 256.021.298.184 24.860.087.622.909 76.268.630.255.066 (18.334.550.982) 76.250.295.704.084 Total Financial Liabilities
31 Desember/ December 31, 2023
Tingkat bunga rata-rata
tertimbang efektif/ < 1 Tahun/ >1-2 Tahun/ >2-3 Tahun/ >3 Tahun/ Jumlah/ Biaya Emisi/ Nilai Tercatat/
Weighted average < 1 Year >1-2 Years >2-3 Years >3 Years Total Issuance Costs Carrying Amount
effective interest rate Rp Rp Rp Rp Rp Rp Rp
Tanpa Bunga Non-interest bearing
Utang Usaha -- 3.861.057.513.747 1.548.140.324.379 252.022.843.503 -- 5.661.220.681.629 -- 5.661.220.681.629 Accounts Payable
Utang Bruto Subkontraktor -- 1.238.493.253.050 449.220.116.865 -- -- 1.687.713.369.915 -- 1.687.713.369.915 Gross Amount Due to Subcontractors
Biaya yang Masih Harus Dibayar -- 3.326.419.315.615 -- -- -- 3.326.419.315.615 -- 3.326.419.315.615 Accrued Expenses
Liabilitas Sewa Guna Usaha -- 7.157.455.725 20.781.049.872 -- -- 27.938.505.597 -- 27.938.505.597 Lease Liabilities
Utang Ventura Bersama -- -- 1.332.247.776.159 -- -- 1.332.247.776.159 -- 1.332.247.776.159 Joint Venture Payable
Utang Lain-lain Jangka Panjang -- -- 310.522.632.588 -- -- 310.522.632.588 -- 310.522.632.588 Other Long-Term Payables
Instrumen tingkat bunga variabel Variable interest rate instrument
Utang Lembaga Keuangan Non Bank 10,50 -- 5.785.277.386.796 -- -- 5.785.277.386.796 -- 5.785.277.386.796 Loan to Financial Institution Non Bank
Instrumen suku bunga tetap Fixed interest rate instruments
Utang Bank Jangka Pendek 0 - 11 720.631.167.369 -- -- -- 720.631.167.369 -- 720.631.167.369 Short-Term Bank Loans
Utang Bank Jangka Panjang 5,40 - 5,50 1.075.221.017.962 26.205.550.508.249 -- 19.837.786.334.377 47.118.557.860.588 -- 47.118.557.860.588 Long-Term Bank Loans
Surat Utang Jangka Menengah 10 250.000.000.000 485.727.511.026 -- -- 735.727.511.026 -- 735.727.511.026 Medium Term Notes
Utang Obligasi 6,10 - 11,10 4.715.500.000.000 228.966.761.482 -- 3.900.300.000.000 8.844.766.761.482 (16.141.828.351) 8.828.624.933.131 Bonds Payable
Sukuk Mudharabah 6,10 - 11,10 -- -- -- 1.148.100.000.000 1.148.100.000.000 (2.918.892.530) 1.145.181.107.470 Sukuk Mudharabah
Liabilitas Jangka Pendek Lainnya -- 2.229.199.098.279 -- -- -- 2.229.199.098.279 -- 2.229.199.098.279 Other Short-Term Liabilities
Jumlah Liabilitas Keuangan 17.423.678.821.747 36.366.434.067.415 252.022.843.503 24.886.186.334.377 78.928.322.067.043 (19.060.720.881) 78.909.261.346.162 Total Financial Liabilities
Grup mengelola risiko likuiditas dengan The Group manages liquidity risk by
mempertahankan kas dan setara kas yang maintaining cash and cash equivalents
mencukupi dalam memenuhi komitmen sufficient to meet the commitments of
Grup untuk operasi normal dan secara rutin the Group for normal operation and regularly
- 204 -
Page 202
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
mengevaluasi proyeksi arus kas dan arus evaluates cash flow projections and actual
kas aktual, serta jadwal tanggal jatuh tempo cash flows, and the schedule date of maturity
aset dan liabilitas keuangan. of assets and financial liabilities.
iv. Risiko Nilai Tukar Mata Uang Asing iv. Foreign Exchange Risk Foreign Currency
Eksposur risiko nilai tukar mata uang asing Risk exposure of foreign currency exchange
merupakan bagian dari kegiatan operasi rate is part of normal operations of
normal Perusahaan dan cabang Luar the Company and the Foreign branches.
Negeri.
Pengaruh dari selisih nilai tukar mata uang The effect of foreign exchange currency
asing tidak signifikan. differences is not significant.
v. Risiko Perubahan Kebijakan Pemerintah, v. Risk of Changes in Government Policy,
Kondisi Ekonomi dan Sosial Politik Economic and Social Politics
Kebijakan Pemerintah baik yang Government policies concerning economic
menyangkut ekonomi dan moneter, serta and monetary, and social and political
kondisi sosial dan politik yang kurang conditions that are less conducive will result
kondusif akan berakibat menurunnya in the decreasing of investment and
investasi dan pembangunan. Hal ini dapat development. This can lead to delays in
mengakibatkan tertundanya proyek-proyek projects that have been or will be acquired by
yang telah maupun akan diperoleh Grup. the Group.
Risiko ini merupakan risiko yang bersifat This risk is a systemic risk whereby if this
sistemik dimana bila risiko ini terjadi maka happens then the risk will negatively affect all
akan mempengaruhi secara negatif seluruh the variables involved, this make
variabel yang terlibat, sehingga membuat the performance of the Group decrease.
kinerja Grup menurun. Diversifikasi risiko ini Even risk diversification is not able to
pun belum mampu menghilangkan risiko ini. eliminate this risk.
c. Manajemen Risiko Modal c. Capital Risk Management Policy
Tujuan dari Grup dalam mengelola permodalan The purpose of the Group in managing capital is
adalah untuk melindungi kemampuan Grup dalam to protect the ability of the Group in maintaining
mempertahankan kelangsungan usaha, sehingga business continuity, so the Group can still deliver
Grup dapat tetap memberikan hasil bagi pemegang results for shareholders and benefits for other
saham dan manfaat bagi pemangku kepentingan stakeholders, and to provide adequate returns to
lainnya, dan untuk memberikan imbal hasil yang shareholders by pricing products and services
memadai kepada pemegang saham dengan that are commensurate with the level of risk.
menentukan harga produk dan jasa yang sepadan
dengan tingkat risiko.
Grup menetapkan sejumlah modal sesuai The Group set a number of capital in proportion
proporsi terhadap risiko. Grup mengelola struktur to the risk. The Group manages its capital
modal dan membuat penyesuaian dengan structure and makes adjustments taking into
memperhatikan perubahan kondisi ekonomi dan account changes in economic conditions and risk
karakteristik risiko aset yang mendasari. characteristics of the underlying asset.
Konsisten dengan Perusahaan lain dalam Consistent with other companies in the industry,
industri, Grup memonitor modal dengan dasar the Group monitors capital on the basis of
rasio utang terhadap modal yang disesuaikan. the debt ratio of to adjusted capital. This ratio is
Rasio ini dihitung sebagai berikut: utang neto calculated as follows: net debt divided by
dibagi modal yang disesuaikan. Utang neto adjusted capital. Net debt is total liabilities
merupakan total liabiltas (sebagaimana jumlah (as the amount in the statement of financial
dalam laporan posisi keuangan) dikurangi kas position) minus cash and cash equivalents.
dan setara kas.
Strategi Grup untuk mempertahankan rasio The Group's strategy is to maintain ratio of
utang terhadap modal yang disesuaikan pada the debt to adjusted capital at the lower limit with
batas bawah dari kisaran 2 Rasio utang terhadap the range of 2 Debt to capital ratio as of March
modal yang disesuaikan pada tanggal 31 Maret 31, 2024 and December 31, 2023 are as follows:
2024 dan 31 Desember 2023 adalah sebagai
berikut:
- 205 -
Page 203
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
31 Maret/ 31 Desember/
March 31, 2024 December 31, 2023
Rp Rp
Liabilitas Keuangan Financial Liabilities
Suku bunga mengambang 700.127.052.202 720.631.167.369 Floating Interest Rate
Total Liabilitas 81.575.817.442.200 83.994.385.906.808 Total Liabilities
Dikurang: Kas dan Setara Kas 2.850.737.198.629 1.340.065.112.240 Deduct: Cash and Cash Equivalents
Liabilitas Bersih 78.725.080.243.571 82.654.320.794.568 Net Liabilities
Total Ekuitas 10.629.175.713.489 11.601.511.551.159 Total Equity
Rasio Utang terhadap Modal 7,41 7,12 Net Debt to Equity Ratio
d. Risiko Legal d. Legal Risk
Risiko legal berupa tuntutan pidana maupun Legal risks in the form of criminal charges or civil
gugatan perdata dapat terjadi apabila terdapat suits can occur if there is (or is fulfilled) an
(atau terpenuhinya) unsur Perbuatan Melawan element of illegal acts. Actions against the law
Hukum. Perbuatan melawan hukum adalah are actions taken by the Company in carrying out
tindakan yang dilakukan oleh Perusahaan dalam operational activities and/or corporate actions
menjalankan kegiatan operasi dan/atau aksi that are contrary to applicable regulations.
korporasi yang bertentangan dengan regulasi
yang berlaku.
Upaya mitigasi yang telah dan akan tetap Mitigation efforts that have been and will continue
dilakukan oleh Perusahaan untuk menghindari to be carried out by the Company to avoid illegal
terjadinya perbuatan melawan hukum adalah acts are to review every operational activity and/
melakukan review atas setiap kegiatan operasi or corporate action based on applicable
dan/ atau aksi korporasi berdasarkan regulasi regulations before deciding to carry out a
yang berlaku sebelum memutuskan menjalankan transaction. To ensure a controlled legal risk
transaksi. Untuk memastikan kerangka risiko framework and maintain business continuity, the
legal yang terkendali dan tetap menjaga Company carries out:
keberlangsungan usaha, Perusahaan
melakukan:
• Analisis risiko atas suatu transaksi yang • Risk analysis of a transaction to be carried
akan dilakukan, dan out, and
• Review atas perjanjian yang akan ditanda- • Review of the agreement to be signed.
tangani.
Kegiatan review tersebut dapat dilakukan secara The review activity can be carried out in-house or
in-house atau dengan melibatkan Konsultan by involving a Company Legal Consultant.
Hukum Perusahaan.
60. KOMITMEN DAN KONTIJENSI 61. COMMITMENT AND CONTINGENCY
Perusahaan The Company
Berdasarkan akta notaris Euis Budiarti Afandi, Based on notarial deed of Euis Budiarti Afandi,
Sarjana Hukum, Spesialis Notaris No. 02/WASKITA- Bachelor of Law, Notary Specialist No.
ACSET/KSO/2017, tanggal 19 Januari 2017 telah 02/WASKITA-ACSET/KSO/2017, dated January 19,
dibentuk Kerjasama Operasi (KSO) antara 2017 has been established Joint Operation (JO)
Perusahaan dengan PT Acset Indonusa Tbk dengan between the Company with PT Acset Indonusa
nama Waskita - Acset KSO untuk pelaksanaan Tbk under the name of JO Waskita - Acset for
pekerjaan pembangunan Jalan Tol Jakarta Cikampek the engagement of Jakarta Cikampek II Toll Road
II Elevated ruas Cikunir s.d Karawang Barat (Sta. Elevated Cikunir to West Karawang
9+500 s.d Sta. 47+500). (Sta. 9 + 500 s.d Sta. 47 + 500).
Perusahaan mempunyai porsi yang dikerjakan The Company has a portion of joint operation for
secara porsi untuk pelaksanaan pekerjaan the engagement of the construction work of Jakarta
pembangunan Jalan Tol Jakarta Cikampek II Cikampek II Toll Road Elevated Cikunir to West
Elevated ruas Cikunir s.d Karawang Barat Karawang Sta. 9 + 500 - Sta. 28 + 480 based on
Sta. 9+500 - Sta. 28+480 berdasarkan perjanjian cooperation agreement (KSO) No: 01/WASKITA-
kerja sama operasi (KSO) No: 01/WASKITA- ACSET/JOA/2017. The rest of the construction work
ACSET/JOA/2017. Sisa pekerjaan pembangunan of the Jakarta Cikampek II Toll Road Elevated Cikunir
Jalan Tol Jakarta Cikampek II Elevated ruas Cikunir to West Karawang segment
s.d Karawang Barat (Sta. 9+500 s.d Sta. 47+500) (Sta. 9 + 500 s.d Sta. 47 + 500) is worked by joint
dilaksanakan secara ventura bersama. venture.
- 206 -
Page 204
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
WSE WSE
WSE menandatangani Power Purchase Agreement WSE entered into Power Purchase Agreement (PPA)
(PPA) pada tanggal 23 Maret 2015 dengan PLN. on March 23, 2015 with PLN. Under the terms of
Berdasarkan ketentuan PPA, PLN telah berkomitmen the PPA, PLN has committed to purchase
untuk membeli kapasitas pembangkit listrik WSE dan the available capacity of the WSE’s power stations
seluruh hasil listrik selama dua puluh tahun sampai and all generated of electricity for a period of twenty
2036. years until 2036.
WSE telah membangun, memiliki dan WSE has build, owned and operated the plant
mengoperasikan fasilitas pabrik yang berlokasi di facilities at site which is located at South Solok, West
Solok Selatan, Sumatera Barat. Sumatera.
Setelah beroperasi secara komersial dalam proyek, Upon commercial operation of the Project, WSE is
WSE berkewajiban menyediakan kepada PLN obligated to make available to PLN the net electrical
keluaran listrik bersih dari fasilitas proyek, yang akan output of the project's plant facilities, which will be
dibeli oleh PLN pada jumlah yang ditentukan purchased by PLN at amounts determined under
berdasarkan formula yang tercantum dalam PJBL. formula set forth in the PJBL. The amount to be paid
Jumlah yang harus dibayar oleh PLN adalah jumlah by PLN is the amount of net electrical output
keluaran listrik bersih yang dihasilkan. Jangka waktu produced. The term of the PPA commenced on
PPA dimulai pada tanggal 9 Desember 2016 dan December 9, 2016 and will expire on December 9,
akan berakhir pada tanggal 9 Desember 2036, 2036, unless terminated earlier in accordance with
kecuali diakhiri lebih awal sesuai dengan ketentuan the terms of the PPA, as amended.
PPA, sebagaimana telah diubah.
Seluruh pihak sepakat harga energi listrik terukur All parties agreed electricity price estimated on
pada titik transaksi, yaitu: transaction points as stated:
i. Rp1.182,50 per kWh untuk tahun ke-1 sampai i. Rp1,182.50 per kWh for year-1 through year-8
dengan tahun ke-8 sejak tanggal operasi since the date of plant’s commercial operation;
komersial pembangkit; dan and
ii. Rp825 per kWh untuk tahun ke-9 sampai dengan ii. Rp825 per kWh for year-9 through year-20 since
tahun ke-20 sejak tanggal operasi komersial the date of plant’s commercial operation.
pembangkit.
PLN memiliki opsi untuk membeli hak, kepemilikan, PLN has an option to purchase the WSE's right, title
dan kepentingan WSE dalam proyek dengan nilai and interest in the project for a termination value
terminasi berdasarkan formula tertentu yang based on a certain formula set forth in the PPA.
tercantum dalam PPA. Harga beli yang harus dibayar The purchase price to be paid by PLN, in case PLN
oleh PLN, dalam hal PLN melakukan opsi pembelian, exercises the purchase option, decreases as the end
mengalami penurunan seiring menjelang berakhirnya of the PPA approaches.
PPA.
Pada tanggal 1 Juni 2016, WSE dan PLN On June 1, 2016, WSE and PLN entered into
menandatangani amandemen PPA terkait kewajiban the amendment to the PPA regarding obligation and
dan tanggung jawab para pihak, pembangunan responsibilities of both parties, construction of power
pembangkit dan pembayaran yang diizinkan plants and payment, which is allowed under
berdasarkan PPA awal, jika disetujui kedua belah the original PPA, if agreed by both parties. Under
pihak. Di bawah PPA, kedua belah pihak sepakat the PPA, both parties agreed to amend certain
untuk mengubah hal-hal tertentu dari PPA awal. matters of the original PPA.
WKR WKR
Dalam rangka melakukan kegiatan usaha, WKR In connection with its operations, WKR entered into
memiliki perjanjian-perjanjian penting. Perjanjian dan significant agreements. The significant agreements
ikatan penting yang masih berlaku sampai dengan and commitments applied until December 31, 2023
tanggal 31 Desember 2023 adalah sebagai berikut: are as follows:
Perjanjian dengan PT Dafam Hotel Management Agreement with PT Dafam Hotel Management
Pada tanggal 24 Maret 2016, WKR menandatangani Based on the Deed No. 2 dated March 24, 2016,
perjanjian No. 2 dengan PT Dafam Hotel WKR entered into management agreement with
Management (Operator). Berdasarkan perjanjian PT Dafam Hotel Management (the Operator). Based
tersebut, PT Dafam Hotel Management on the agreement, PT Dafam Hotel Management is
- 207 -
Page 205
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
bertanggungjawab sebagai operator atas Hotel responsible as the operator of Hotel Dafam Teraskita
Dafam Teraskita milik WKR. owned by WKR.
Jangka waktu perjanjian adalah 10 (sepuluh) tahun The period of the agreement is 10 (ten) years since
sejak ditandatanganinya perjanjian dan dapat the signing date of this agreement and could be
diperpanjang jika disetujui oleh kedua belah pihak renewed if agreed upon by both parties at least 90
paling lambat 90 hari kerja sebelum tanggal working days before the expiration date.
berakhirnya.
Berdasarkan perjanjian tersebut, para pihak Based on those agreements, all parties agreed that
menyetujui bahwa PT Dafam Hotel Management PT Dafam Hotel Management as Operator entitled to
sebagai Operator berhak menerima: receive:
1. Technical Assistant Fee sebesar Rp600.000.000 1. Technical Assistant Fee amounting to
yang dibayarkan pada tanggal 26 Mei 2015. Rp600,000,000 which has been paid on May 26,
2015.
2. Base fee sebesar 2% pada tahun pertama dan 2. Base fee of 2% for the first year and 2,5% for
2,5% di tahun-tahun berikutnya dari Total following years from of Total Operating Revenue.
Pendapatan Operasional.
3. Incentive Fee berdasarkan tinggi rendahnya 3. Incentive Fee based on high and low of Gross
Gross Operating Profit (GOP): Operating Profit (“GOP”):
a. 0% dari GOP apabila GOP kurang dari 35% a. 0% of GOP if GOP is less than 35% of Total
dari Pendapatan Hotel Total; Revenue Hotel;
b. 5% dari GOP apabila GOP lebih dari 35% b. 5% of GOP if GOP is more than 35% and
dan kurang dari atau sama dengan 45% dari less than or equivalent with 45% of Total
Pendapatan Hotel Total; dan Revenue Hotel; and
c. 7% dari GOP apabila GOP lebih dari 45% c. 7% of GOP if GOP is more than 45% of Total
dari Pendapatan Hotel Total. Revenue Hotel.
4. Sales and marketing fee adalah 1% dari 4. Sales and marketing fee are 1% of the gross
pendapatan kotor kamar per bulan. revenue room per month.
Perjanjian KSO dengan PT Sirius Terang Joint Venture Agreement with PT Sirius Terang
Cemerlang Cemerlang
Pada tanggal 26 Mei 2015, WKR menandatangani On May 26, 2015, WKR entered into joint venture
kontrak perjanjian KSO No. 166 dengan PT Perintis agreement No. 166 with PT Perintis Triniti Properti
Triniti Properti dan PT Perintis Trusmi Properti dalam and PT Perintis Trusmi Properti in order to develop
rangka pengembangan tanah seluas 5.000 m2 yang 5,000 sqm land areas at Jalan Sutera Boulevard,
terletak di Jalan Sutera Boulevard, Alam Sutera, Alam Sutera, Tangerang. The agreement ends when
Tangerang. Perjanjian ini berakhir apabila the execution of the joint venture’s project work has
pelaksanaan pekerjaan proyek KSO telah selesai been completed demonstrated with the expiration of
dengan dibuktikannya telah habisnya masa the maintenance work of the contractor and joint
pemeliharaan pekerjaan kontraktor dan KSO, serta venture, as well as all rights and obligations between
seluruh hak dan kewajiban antara KSO dengan the joint venture and a buyer, a third party,
pembeli, pihak ketiga, Instansi Pemerintah yang government agencies involved and is competent in
terkait dan berwenang dalam rangka pelaksanaan the implementation and completion of the joint
dan penyelesaian KSO telah terpenuhi semuanya venture has been fulfilled without causing arrears of
tanpa menimbulkan tunggakan kewajiban. obligations.
Komposisi penyertaan saham terdiri dari WKR The composition of shareholders consists of WKR at
sebesar 40,8%, PT Perintis Triniti Properti sebesar 40.8%, PT Perintis Properti Triniti at 39.2%, and
39,2%, dan PT Perintis Trusmi Properti sebesar 20% PT Perintis Trusmi Properti at 20% with an initial
dengan modal awal sebesar Rp125.000.000.000. capital of Rp125,000,000,000.
Pada tanggal 30 Oktober 2015, terdapat pembaruan On October 30, 2015, there is a renewal of the KSO
perjanjian KSO Waskita Triniti II. Disepakati bahwa Waskita Triniti II agreement. It was agreed that the
posisi PT Perintis Triniti Properti digantikan oleh position PT Perintis Triniti Properti is replaced by
PT Sirius Terang Cemerlang. Seluruh hak dan PT Sirius Terang Cemerlang. All rights and
kewajiban PT Perintis Triniti Properti dialihkan obligations of PT Perintis Triniti Properti is transferred
kepada PT Sirius Terang Cemerlang. to PT Sirius Terang Cemerlang.
- 208 -
Page 206
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Berdasarkan Akta No. 9 tanggal 3 Oktober 2016, Based on the Deed No. 9 dated October 3, 2016,
terdapat perubahan perjanjian KSO Waskita Triniti II there is a change of the KSO Waskita Triniti II
yang berisi komposisi penyertaan saham yang baru, agreement which contains the composition of
yaitu WKR sebesar 50,8% atau senilai investments in new shares, namely WKR of 50.8% or
Rp69.646.800.000 dan PT Sirius Terang Cemerlang equivalent to Rp69,646,800,000 and PT Sirius
sebesar 49,2% atau senilai Rp67.453.200.000. Terang Cemerlang by 49.2% or equivalent to
Rp67,453,200,000.
Perjanjian KSO dengan PT Darmo Permai Joint Venture Agreement with PT Darmo
Permai
Pada tanggal 21 Mei 2014, WKR menandatangani On May 21, 2014, WKR entered into KSO agreement
kontrak perjanjian KSO No. 6 dengan PT Darmo No. 6 with PT Darmo Permai in order to develop
Permai dalam rangka pengembangan tanah seluas 34,089 sqm land areas at Segi 8 Darmo Jalan Raya
34.089 m2 yang terletak di Segi 8 Darmo Jalan Raya Darmo Permai III, Surabaya Barat.
Darmo Permai III, Surabaya Barat.
Perjanjian ini berakhir apabila pelaksanaan pekerjaan The agreement ends when the execution of the joint
proyek KSO telah selesai dengan dibuktikannya telah venture’s project work has been completed
habisnya masa pemeliharaan pekerjaan kontraktor demonstrated with the expiration of
dan KSO, serta seluruh hak dan kewajiban antara the maintenance work of the contractor and joint
KSO dengan pembeli, pihak ketiga, Instansi venture, as well as all rights and obligations between
Pemerintah yang terkait dan berwenang dalam the joint venture and a buyer, a third party,
rangka pelaksanaan dan penyelesaian KSO telah government agencies involved and is competent in
terpenuhi semuanya tanpa menimbulkan tunggakan the implementation and completion of the joint
kewajiban. venture has been fulfilled without causing arrears of
obligations.
Komposisi penyertaan saham terdiri dari WKR The composition of shareholders consists of WKR at
sebesar 51%, PT Darmo Permai sebesar 49% 51%, PT Darmo Permai at 49% with an initial capital
dengan modal awal sebesar Rp426.112.500.000. of Rp426,112,500,000.
Perjanjian KSO dengan PT Graha Jasa Ekatama Joint Venture Agreement with PT Graha Jasa
Ekatama
Pada tanggal 6 Juni 2016, WKR menandatangani On June 6, 2016, WKR entered into KSO agreement
kontrak perjanjian KSO No. 17 dengan PT Graha No. 17 with PT Graha Jasa Ekatama in order to
Jasa Ekatama dalam rangka pengembangan tanah develop 11,090 sqm at West Pejaten, South Jakarta.
seluas 11.090 m2 di Pejaten Barat, Jakarta Selatan. The agreement ends when the execution of the
Perjanjian ini berakhir apabila pelaksanaan pekerjaan joint venture’s project work has been completed
proyek KSO telah selesai dengan dibuktikannya telah demonstrated with the expiration of the maintenance
habisnya masa pemeliharaan pekerjaan kontraktor work of the contractor and joint venture, as well as all
dan KSO, serta seluruh hak dan kewajiban antara rights and obligations between the joint venture and
KSO dengan pembeli, pihak ketiga, Instansi a buyer, a third party, government agencies involved
Pemerintah yang terkait dan berwenang dalam and is competent in the implementation and
rangka pelaksanaan dan penyelesaian KSO telah completion of the joint venture has been fulfilled
terpenuhi semuanya tanpa menimbulkan tunggakan without causing arrears of obligations. The
kewajiban. Komposisi penyertaan saham di dalam composition of the shareholder in the Waskita
KSO Waskita Ekatama terdiri dari WKR sebesar 60%, Ekatama joint venture consists of WKR at 60%, PT
PT Graha Jasa Ekatama sebesar 40% dengan Graha Jasa Ekatama at 40% with initial capital of
modal awal sebesar Rp331.000.000.000. Rp331,000,000,000.
Perjanjian KSO dengan PT Rajawali Nusantara Joint Venture Agreement with PT Rajawali
Indonesia Nusantara Indonesia
Pada tanggal 10 Oktober 2016, WKR On October 10, 2016, WKR entered into KSO
menandatangani kontrak perjanjian KSO No. 2079 agreement No. 2079 with PT Rajawali Nusantara
dengan PT Rajawali Nusantara Indonesia dalam Indonesia in order to develop 7,025 sqm of land at
rangka pengembangan tanah seluas 7.025 m2 di Jalan MT. Haryono Kav 12-13, East Jakarta.
Jalan MT. Haryono Kav 12-13, Jakarta Timur. Jangka The operating periods is valid for 48 months and
waktu operasi berlaku selama 48 bulan dan perjanjian the agreement ends when the execution of
ini berakhir apabila pelaksanaan pekerjaan proyek the joint venture’s project work has been completed,
KSO telah selesai dengan dibuktikannya telah demonstrated with the expiration of the maintenance
habisnya masa pemeliharaan pekerjaan kontraktor work of the contractor and joint venture, as well as all
- 209 -
Page 207
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
dan KSO, serta seluruh hak dan kewajiban antara rights and obligations between the joint venture and
KSO dengan pembeli, pihak ketiga, Instansi a buyer, a third party, government agencies involved
Pemerintah yang terkait dan berwenang dalam and is competent in the implementation and
rangka pelaksanaan dan penyelesaian KSO telah completion of the joint venture has been fulfilled
terpenuhi semuanya tanpa menimbulkan tunggakan without causing arrears of obligations.
kewajiban.
Komposisi penyertaan modal di dalam KSO RNI - The composition of the capital investment in the KSO
Waskita terdiri dari RNI berupa tanah seluas 7.052 RNI - Waskita consists of RNI with land areas of
m2, dan WKR berupa modal kerja 7,052sqm and WKR with initial capital of
sebesar Rp361.912.928.457. Rp361,912,928,457.
Pada akhir periode perjanjian KSO, RNI akan At the end of joint venture agreement, RNI will receive
menerima bagi hasil senilai Rp367.544.705.882. profit sharing amounting to
Rp367,544,705,882.
Perjanjian dengan PT Kereta Api Indonesia Agreement with PT Kereta Api Indonesia
(Persero) (Persero)
Pada tanggal 30 November 2017, Perusahaan On November 30, 2017, the Company entered into
menandatangani perjanjian Kerja Sama Usaha (KSU) agreement with PT Kereta Api Indonesia (Persero)
dengan PT Kereta Api Indonesia (Persero) No. 007/P.WKR/2017 related to Transit Development
No. 007/P.WKR/2017 terkait dengan Transit Orientation Project in Bogor. Both parties agreed to
Development Orientation Project di Bogor. Kedua develop the utilization of land owned by PT Kereta
belah pihak secara bersama-sama sepakat untuk Api Indonesia (Persero) in Bogor station area. This
melakukan kerjasama terkait dengan pemanfaatan agreement will be due on November 2070.
lahan milik PT Kereta Api Indonesia (Persero) di
kawasan stasiun Bogor. Perjanjian ini berakhir pada
November 2070.
Perjanjian KSO RNI - WSKT Agreement KSO RNI - WSKT
Pada tanggal 20 November 2017, KSO RNI – On November 20, 2017, KSO RNI - Waskita entered
Waskita membuat perjanjian Pengikatan Jual Beli into agreement with WSKT No. 04 on sale of office
(PPJB) dengan WSKT No. 04 tentang penjualan space owned by KSO RNI Waskita project amounting
ruang perkantoran pada proyek KSO RNI Waskita to Rp563,310,000,000 before VAT and has been
dengan nilai jual Rp563.310.000.000 sebelum PPN revised with No. 01/AMD/PPJB/KSO/RNI-
dan terakhir dilakukan amandemen dengan No: WASKITA/2018 dated July 13, 2018. The payment
01/AMD/PPJB/KSO/RNI-WASKITA/2018 tanggal 13 made by installment basis untill the completion of
Juli 2018. Pembayaran atas penjualan ini dilakukan development and Buy and Sell Deed signed between
secara bertahap sampai dengan penyelesaian both of sides.
pembangunan dan Akta Jual Beli ditandatangani
kedua belah pihak.
61. REKLASIFIKASI AKUN 61. RECLASSIFICATION OF ACCOUNTS
Reklasifikasi tertentu telah dilakukan terhadap Certain reclassifications have been made to the
laporan keuangan konsolidasian periode sebelumnya prior year’s consolidated financial statements to
untuk meningkatkan keterbandingan dengan laporan enhance comparability with the current period’s
keuangan konsolidasian periode berjalan. consolidated financial statements.
Akibatnya, pos-pos tertentu telah diubah di laporan As a result, certain line items have been amended in
posisi keuangan konsolidasian, laporan laba rugi dan the consolidated statement of financial position, profit
penghasilan komprehensif lain dan catatan atas or loss and other comprehensive income and the
laporan keuangan konsolidasian terkait. Angka related notes to the consolidated financial
komparatif telah disesuaikan dengan penyajian statements. Comparative figures have been adjusted
periode berjalan. to conform to the current period’s presentation.
31 Maret/ March 31, 2023
Sebelum Reklasifikasi/ Reklasifikasi/ Setelah Reklasifikasi/
Before Reclassified Reclassification As Reclassified
Rp Rp Rp
Beban Penjualan (6.611.344.296) (23.311.660.086) (29.923.004.382) Selling Expenses
Beban Umum dan Administrasi (505.284.670.638) 179.627.490.135 (325.657.180.503) General and Administrative Expenses
Beban - Non-contributing Plant -- (79.432.345.234) (79.432.345.234) Non-contributing Plant - Expenses
Pendapatan (Beban) Lain - lain - Bersih 433.095.419.886 (76.883.484.815) 356.211.935.071 Other Income (Expense) - Net
- 210 -
Page 208
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
Manajemen menilai bahwa reklasifikasi akun yang Management has assessed that the reclassification
disebutkan diatas tidak mempunyai dampak yang of the abovementioned accounts has no material
material terhadap informasi dalam laporan posisi impact on the information in the consolidated
keuangan konsolidasian. statement of financial position.
63. KELANGSUNGAN USAHA 63. GOING CONCERN
Pada tahun 2023, Grup telah mengalami kerugian The Group incurred losses amounting to
sebesar Rp4.018.265.010.703, yang mengakibatkan Rp4,018,265,010,703 in 2023, which resulted to
defisit sebesar Rp11.985.083.442.767. Kondisi ini a deficit of Rp11,985,083,442,767 as at March 31,
timbul akibat dari beberapa proyek bermasalah yang 2024. These conditions arose due to several
memerlukan pendanaan dari utang, sehingga Grup problematic projects that required funding from debt,
perlu melakukan restrukturisasi perjanjian utang, dan which necessitated the restructuring of loans and
memasuki masa standstill dan pengaturan cash entering into a standstill period and cash waterfall
waterfall. arrangements by the Group.
Faktor-faktor ini, antara lain, menunjukkan adanya These conditions, among others, indicate
ketidakpastian material yang dapat menimbulkan the existence of a material uncertainty that may cast
keraguan signifikan pada kemampuan Grup untuk significant doubt on the Group’s ability to continue as
melanjutkan kelangsungan usahanya dan, oleh a going concern and, therefore, it may be unable to
karena itu, mungkin tidak dapat merealisasikan realize its assets and discharge its liabilities in
asetnya dan melunasi kewajibannya dalam kegiatan the normal course of business. The consolidated
bisnis normal. Laporan keuangan tidak termasuk financial statements do not include any adjustments
penyesuaian yang mungkin timbul dari hasil that might result from the outcome of this uncertainty.
ketidakpastian ini.
Manajemen secara aktif memantau kondisi keuangan Management is actively monitoring the Group’s
dan kinerja Grup serta mengeksplorasi dan financial condition and performance while continually
menjalankan strategi-strategi berikut sebagai upaya exploring and implementing strategies in an effort to
dalam mengatasi potensi dampak buruk pada kinerja overcome potential adverse impacts on the Group’s
keuangan dan keberlangsungan usaha Grup. antara financial performance and business continuity,
lain sebagai berikut: including the following:
1. Mengimplementasi dan memonitoring secara 1. Implementing and regularly monitoring
berkala atas inisiatif 8 stream penyehatan the Company's 8 stream financial health
keuangan Perseroan. improvement.
2. Menyelesaikan proses restrukturisasi bersama 2. Completing the restructuring process together
dengan Konsultan Konsorsium dalam rangka with the Consortium Consultant to rearrange
mengatur kembali ketentuan-ketentuan yang ada the provisions in the existing documents of
dalam dokumen instrumen utang perbankan dan the Company's banking debt and bond debt
utang obligasi Perseroan. Dalam hal ini, instruments. The Company proposes adjusting
Perseroan mengusulkan penyesuaian skema the debt settlement scheme for the Company's
penyelesaian utang atas instrumen utang banking debt and bond debt instruments
perbankan dan utang obligasi Perseroan sesuai according to its financial capabilities in both
dengan kemampuan keuangan baik dalam the short and long term.
jangka pendek maupun jangka panjang.
3. Memperoleh persetujuan dari seluruh Kreditur 3. Obtaining approval from all Banking Creditors
Perbankan dan Pemegang Obligasi termasuk and Bondholders, including relevant
Stakeholder yang berkaitan dalam proses Stakeholders, in the Company's restructuring
restrukturisasi Perseroan. Sampai dengan process. As of December 2023, the Company
Desember 2023, Perseroan telah mendapatkan has obtained restructuring approval through
persetujuan restrukturisasi melalui RUPSLB 8 an Extraordinary General Meeting of
Desember 2023 sebagaimana dimaksud dalam Shareholders on December 8, 2023, as referred
Peraturan Menteri Badan Usaha Milik Negara to in Ministerial Regulation No. PER-
No. PER-2/MBU/03/2023. Selain hal tersebut, 2/MBU/03/2023. Additionally, the Company is
Perseroan masih dalam proses pengusulan dan still in the process of proposing and obtaining
perolehan persetujuan dari pihak-pihak terkait. approval from the relevant parties.
4. Menghentikan pekerjaan proyek-proyek 4. Temporarily suspend work on problematic
bermasalah sampai diperoleh kejelasan atas projects until a definite plan is obtained on the
keberlanjutan dan kelayakan proyek tersebut sustainability and feasibility of such projects to
untuk menghindari kerugian lebih lanjut. avoid further losses.
- 211 -
Page 209
PT WASKITA KARYA (PERSERO) Tbk PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN NOTES TO CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
31 Maret 2024 MARCH 31, 2024
DAN UNTUK TAHUN YANG BERAKHIR FOR THE YEAR
PADA TANGGAL TERSEBUT THEN ENDED
(Disajikan dalam Rupiah, kecuali dinyatakan lain) (Expressed in Rupiah, unless otherwise stated)
5. Mengajukan kepada Kantor Pajak permohonan 5. Apply for suspension and relief to Tax Office on
penangguhan dan keringanan dalam the settlement of VAT obligations for fiscal years
penyelesaian kewajiban PPN untuk periode 2022 2022 and 2023.
dan 2023.
Kemampuan Grup untuk mempertahankan The Group’s ability to maintain its business as a going
kelangsungan usahanya dan menghadapi tantangan concern and face external challenges depends on the
eksternal bergantung pada kemampuan Grup untuk Group’s ability to generate sufficient cash flow to
menghasilkan arus kas yang cukup untuk memenuhi meet its liabilities on a timely basis, as well as the
liabilitasnya secara tepat waktu, serta kemampuan Group’s ability to have future profitable operations
Grup untuk menjalankan operasi yang and improve its financial position.
menguntungkan di masa depan dan meningkatkan
posisi keuangannya.
Laporan keuangan disusun berdasarkan The consolidated financial statements have been
kelangsungan usaha yang mengasumsikan bahwa prepared on a going concern basis which assumes
Grup akan mampu merealisasikan asetnya dan that the Group will be able to realize its assets and
melunasi liabilitasnya dalam kegiatan bisnis normal di discharge its liabilities in the normal course of
masa mendatang. Asumsi kelangsungan usaha business in the foreseeable future. The going
tunduk pada risiko dan ketidakpastian seperti yang concern assumption is subject to risks and
dijelaskan di atas, sehingga ada kemungkinan bahwa uncertainties as described above, hence there is
perubahan keadaan yang merugikan dapat possibility that adverse changes in circumstances
berdampak pada kelangsungan usaha Grup. Jika may have an impact on the Group’s going concern. If
perubahan keadaan tersebut terjadi, asumsi a change in such circumstances occurs, the Group’s
kelangsungan usaha Grup dapat berubah. Laporan going concern assumption may be changed.
keuangan tidak mencakup penyesuaian yang
mungkin timbul dari hasil ketidakpastian di atas.
64. TANGGUNG JAWAB MANAJEMEN DAN 64. MANAGEMENT RESPONSIBILITY AND
PERSETUJUAN ATAS LAPORAN KEUANGAN APPROVAL OF THE CONSOLIDATED FINANCIAL
KONSOLIDASIAN STATEMENTS
Penyusunan dan penyajian wajar laporan keuangan The preparation and fair presentation of
konsolidasian merupakan tanggung jawab the consolidated financial statements is
manajemen, dan telah di setujui oleh direktur untuk the responsibility of management, and has been
diterbitkan pada tanggal 29 April 2024. approved by the director to be published on
Aprli 29, 2024.
*******
- 212 -
Page 210
Names mentioned 159 people and organisations named in the text · linked when the evidence is strong
unresolved
org
Bank Financial Institution Loans Pihak Berelasi
p.5
unresolved
org
Bank Loans Penerimaan Pinjaman Lembaga Keuangan Non-Bank
p.8
unresolved
org
Bank Financial Institution Loans Pembayaran Pinjaman Lembaga Keuangan
p.8
unresolved
org
Limited Liability Corporation
p.9
unresolved
person
Kartini Mulyadi
p.9
unresolved
org
Minister of Law
p.9 ×8
unresolved
person
Ashoya Ratam
p.9 ×6
unresolved
org
Kementerian Hukum dan Hak Asasi Manusia
p.9
unresolved
org
Ministry of Law and Human Rights
p.9 ×2
unresolved
org
Pengawas Pasar Modal dan Lembaga
p.10
unresolved
org
Bapepam-LK
p.10 ×4
unresolved
org
Financial Services Authority
p.11 ×2
unresolved
org
Indonesia Stock Exchange
p.12 ×3
unresolved
org
Waskita Beton Tbk
p.12 ×2
unresolved
org
Precast Tbk
p.12
unresolved
org
Beton Precast Tbk
p.12 ×2
unresolved
org
Central Jakarta District Court
p.13 ×2
unresolved
org
Pengadilan Negeri Jakarta Pusat
p.13 ×2
unresolved
person
Notary Dewantari Handayani
p.13 ×4
unresolved
org
Prakerja Tbk.
p.14
unresolved
org
PT Waskita Beton Precast II
p.14
unresolved
person
Zamroni
· Anggota
p.16
unresolved
person
Ermy Puspa Yunita
p.17 ×2
unresolved
org
PT Pemalang Batang Toll Road
p.18
unresolved
org
PT Waskita Transjawa Toll Road
p.18 ×4
unresolved
org
PT Transjawa Paspro
p.18 ×3
unresolved
org
PT Tol Teluk Balikpapan
p.18 ×3
unresolved
person
Fathiah Helmi
p.18 ×11
unresolved
org
Menteri
p.18 ×10
unresolved
person
Zulkifli Harahap
p.18 ×2
unresolved
org
PT Pemalang Batang Tol Road
p.18 ×2
unresolved
person
Bonardo Nasution
p.18
unresolved
org
Menteri Hukum dan Hak
p.18 ×7
unresolved
person
Jose Dima Satria S.H.
· Notaris
p.18 ×11
unresolved
person
Catur Virgo S.H.
p.18 ×6
unresolved
org
Menteri Hukum dan Hak Asasi
p.19 ×3
unresolved
org
PT WST
p.19 ×2
unresolved
org
Minister of Law and Human Asasi Manusia Republik Indonesia
p.19
unresolved
org
Minister of Law Menteri
p.19
unresolved
person
Ir. Nanette Cahyanie Handari Adi Warsito S.H.
· Notaris
p.19 ×5
unresolved
org
Minister of Law and Human Asasi Manusia
p.20 ×2
unresolved
org
Minister of Law and Human Rights Manusia
p.20
unresolved
org
PT Waskita MNC Transjawa Toll
p.20
unresolved
org
PT Waskita MNC Road
p.20
unresolved
org
PT Waskita MNC Transjawa MNC Transjawa Toll Road
p.20
unresolved
org
PT Waskita Transjawa Toll
p.20
unresolved
person
Ir. Nanette
p.21
unresolved
person
Notar Ir. Nanette C.H. Adi Warsito
p.21 ×4
unresolved
person
Ir. Nanette Cahyanie Handari Handari Adi Warsito
· Notaris
p.21 ×11
unresolved
org
PT WTTR
p.21 ×2
unresolved
person
Humberg Lie
p.22 ×3
unresolved
org
Minister of Hukum dan Hak Asasi Manusia
p.22
unresolved
org
Minister of Law and Human Rights
p.22 ×2
unresolved
org
Minister of Kementerian Hukum dan Hak Asasi Manusia
p.22
unresolved
person
Vita Cahyojati
p.23
unresolved
person
Rosida Rajagukguk Siregar
p.23 ×2
unresolved
person
Dewi Tenti Septi Artiany S.H.
p.24 ×2
unresolved
org
Minister of Law and Human Asasi
p.24
unresolved
person
Vita
p.24
unresolved
person
Tiara VIta
p.24
unresolved
org
Ministry of Law
p.24
unresolved
org
PT Waskita Karya Karya Energi
p.24
unresolved
org
PT Waskita Karya Infrastruktur. This
p.24
unresolved
org
Menteri Hukum dan Hak Asasi Manusia Republik
p.24
unresolved
person
Varinia
p.24
unresolved
person
Kokoh Henry
p.25 ×4
unresolved
org
Minister of Badan Hukum Kementerian Hukum dan Hak
p.25
unresolved
org
Koperasi Waskita.
p.25 ×2
unresolved
org
Koperasi Waskita. The Deed
p.25
unresolved
org
Minister of Law Asasi Manusia
p.25
unresolved
person
Lie
p.25
unresolved
org
PT TJT
p.26 ×2
unresolved
org
Koperasi Waskita. Berdasarkan Berita Acara Pemenuhan
p.26
unresolved
org
Bank Indonesia
p.33
unresolved
org
Bank Indonesia Dolar Amerika Serikat
p.33
unresolved
org
Kementerian BUMN
p.35
unresolved
org
Pengatur
p.46 ×2
unresolved
org
Kementerian Pekerjaan Umum
p.47
unresolved
org
Ministry of Public Works
p.47
unresolved
org
KJPP Agus
p.98
unresolved
org
KJPP Firdaus dan Rekan
p.98
unresolved
org
Firdaus dan Partners
p.98
unresolved
org
KJPP Sugeng
p.98 ×2
unresolved
org
Gunawan dan Rekan
p.98
unresolved
org
Kantor Jasa Penilai Publik Penilai Publik Muttaqin
p.98
unresolved
org
Kantor Jasa Penilai Publik Sukandi
p.98
unresolved
org
PT Ade Pede Realty
p.104 ×2
unresolved
org
Government of the Republic of Indonesia
p.196
unresolved
org
Kementerian Keuangan
p.196
unresolved
org
Ministry of Finance
p.196 ×2
unresolved
org
Kementerian Keuangan Pemerintah
p.196
unresolved
org
Ministry of Kementerian Keuangan Pemerintah Republik
p.196
unresolved
org
Bank Garansi
p.196 ×4
unresolved
org
PT Bank Syariah Mandiri
p.196
unresolved
org
PT Bank BNI Syariah
p.196
unresolved
org
PT Bank BRI
p.196
unresolved
org
PT Bank Tabungan Negara Syariah
p.196
unresolved
org
PT Bank Mandiri Taspen
p.196
unresolved
org
PT Trans Jawa Paspro
p.196
unresolved
org
PT Jasamarga Solo Ngawi
p.196
unresolved
org
PT Pejagan Pemalang Tol Road
p.196
unresolved
org
PT Kertas Leces (Persero)
p.196
unresolved
org
PT Istaka Karya (Persero)
p.196
unresolved
org
PT Jasamarga Semarang Batang
p.196
unresolved
org
PT Prima Multi Terminal
p.196
unresolved
org
PT Hutama Marga Waskita
p.196
unresolved
org
PT Jasamarga Japek Selatan
p.196
unresolved
org
PT Jasamarga
p.196
unresolved
org
Bank KSO
p.196
Extraction attempts how the parser did, and what it refused
Nothing structured was extracted from this document — the attempts below say why.
No extraction attempted yet.