Skip to content
Back to announcement

20260827_BBRM_Laporan Informasi dan Fakta Material_32133094.pdf

Other Text extracted BBRM

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 5

Page 1
Go To English Page

 Nomor Surat                           38/0826

 Nama Perusahaan                       Pelayaran Nasional Bina Buana Raya Tbk

 Kode Emiten                           BBRM

 Lampiran                              2
                                       Penyampaian Fakta Material Terkait Pembatalan Perjanjian Pembangunan
 Perihal
                                       1(satu) unit Kapal PSV


Dengan ini kami untuk dan atas nama perusahaan menyampaikan Laporan Informasi atau Fakta Material sebagai
berikut:

 Nama Emiten atau Perusahaan Publik              Pelayaran Nasional Bina Buana Raya Tbk

 Bidang Usaha                                    Pelayaran



 Telepon                                         (021) 295 294 61

 Faksimili                                       (021) 295 294 62

 Alamat Surat Elektronik (email)                 corpsec@bbr.co.id


 Tanggal Kejadian                                27 Agustus 2026
 Jenis Informasi atau Fakta Material             Penyampaian Fakta Material Terkait Pembatalan Perjanjian
                                                 Pembangunan 1(satu) unit Kapal PSV


 Uraian Informasi atau Fakta Material            Pembatalan Perjanjian Pendahuluan dalam rangka
                                                 Pembangunan 1 (satu) kapal Platform Supply Vessel dengan
                                                 kapasitas 3500 MT.

Page 2
Dampak kejadian, informasi atau fakta       Dampak Aspek Operasional.
material tersebut terhadap kegiatan         Pembatalan rencana pembelian kapal tersebut tidak
operasional, hukum, kondisi keuangan,       berdampak signifikan terhadap kegiatan operasional
atau kelangsungan usaha Emiten atau         Perusahaan saat ini, karena kapal yang direncanakan untuk
Perusahaan Publik                           dibeli belum dioperasikan dan belum menjadi bagian dari
                                            armada Perusahaan.

                                            Dampak Aspek Keuangan.
                                            Pembatalan rencana pembelian kapal tidak menimbulkan
                                            dampak keuangan yang signifikan terhadap Perusahaan.
                                            Sehubungan dengan belum adanya pembayaran cicilan atau
                                            pengeluaran investasi atas kapal tersebut, pembatalan
                                            transaksi tidak mengakibatkan kewajiban pengembalian dana
                                            maupun kerugian material.

                                            Dampak Aspek Hukum.
                                            Pembatalan rencana pembelian kapal tidak menimbulkan
                                            dampak hukum terhadap Perusahaan. Berdasarkan
                                            kesepakatan bersama Para Pihak dan ketentuan dalam
                                            Kontrak Pembangunan Kapal, persyaratan pendahuluan
                                            (conditions precedent) untuk berlakunya kontrak belum
                                            terpenuhi, termasuk belum diterbitkannya Corporate
                                            Guarantee dan belum dilakukannya pembayaran cicilan
                                            pertama. Oleh karena itu, Kontrak Pembangunan Kapal
                                            menjadi batal dan tidak berlaku serta tidak lagi mempunyai
                                            kekuatan atau akibat hukum.

                                            Dampak Kelangsungan Usaha.
                                            Pembatalan transaksi pembelian kapal tidak menimbulkan
                                            dampak material terhadap kelangsungan usaha Perusahaan.
                                            Kegiatan operasional dan strategi bisnis Perusahaan tetap
                                            dapat dijalankan dengan mengoptimalkan armada yang
                                            tersedia.


Demikian untuk diketahui.


Hormat Kami,
Pelayaran Nasional Bina Buana Raya Tbk




Susanti Novita

Corporate Secretary




Pelayaran Nasional Bina Buana Raya Tbk
TCC Batavia Tower One 8th Floor, Suite 08-09 Jalan KH. Mas Mansyur Kav. 126
Telepon : (021) 295 294 61, Fax : (021) 295 294 62, www.bbr.co.id



Nama Pengirim                      Susanti Novita

Jabatan                            Corporate Secretary
Tanggal dan Waktu                  27-08-2026 17:19

Page 3
Lampiran                         1. 3. KI Fakta Material Pembatalan Pemb PSV English.pdf


                                 2. 3. KI Fakta Material Pembatalan Pemb PSV Indo.pdf


 Dokumen ini merupakan dokumen resmi Pelayaran Nasional Bina Buana Raya Tbk yang tidak memerlukan tanda
tangan karena dihasilkan secara elektronik oleh sistem pelaporan elektronik. Pelayaran Nasional Bina Buana Raya
                 Tbk bertanggung jawab penuh atas informasi yang tertera didalam dokumen ini.

Page 4
Go To Indonesian Page

 Letter / Announcement No.            38/0826

 Issuer Name                          Pelayaran Nasional Bina Buana Raya Tbk

 Issuer Code                          BBRM

 Attachment                           2

 Subject                              Submission of Material Facts Regarding the Cancellation of the Shipbuilding
                                      Agreement for 1 (One) PSV Vessel

The company hereby announce the Material Information or Facts Report as follows

 Name of Issuer or Public Company               Pelayaran Nasional Bina Buana Raya Tbk

 Business Activities                            Pelayaran


 Telephone                                      (021) 295 294 61

 Faximile                                       (021) 295 294 62

 Email Address                                  corpsec@bbr.co.id


 Date of Event                                  27 August 2026

                                                Submission of Material Facts Regarding the Cancellation of
 Type of Material Information or Facts          the Shipbuilding Agreement for 1 (One) PSV Vessel

 Description of Material Information or         Cancellation of the Preliminary Agreement for the Construction
 Facts                                          of 1 (one) Platform Supply Vessel (PSV) with a capacity of
                                                3,500 MT.

 Impact of event, material information or       Impact of Operational Activities.
 facts towards Issuers or Public                The cancellation of the planned vessel purchase does not
 Company’s operational activities, legal,       have a significant impact on the Company current operational
 financial condition, or going concern          activities, as the vessel intended to be purchased has not yet
                                                been operated and has not yet become part of the Company
                                                fleet.
                                                Impact of Financial Condition.
                                                The cancellation of the planned vessel purchase does not
                                                have a significant financial impact on the Company. As no
                                                installment payments or capital expenditures in respect of the
                                                vessel have been made, the cancellation of the transaction
                                                does not result in any obligation to refund funds or any
                                                material loss.
                                                Impact of Laws.
                                                The cancellation of the planned vessel purchase does not
                                                have any legal impact on the Company. Based on the mutual
                                                agreement of the Parties and the provisions of the Shipbuilding
                                                Agreement, the conditions precedent to the effectiveness of
                                                the Contract had not been fulfilled, including the issuance of
                                                the Corporate Guarantee and the payment of the first
                                                installment. Accordingly, the Shipbuilding Agreement was
                                                cancelled and became null and void, and shall no longer have
                                                any legal force or effect.
                                                Impact of Business Continuity.
                                                The cancellation of the vessel purchase transaction does not
                                                have a material impact on the Company going concern. The
                                                Company operational activities and business strategy can
                                                continue to be carried out by optimizing the available fleet.


Thus to be informed accordingly.

Page 5
Respectfully,
Pelayaran Nasional Bina Buana Raya Tbk




Susanti Novita

Corporate Secretary




Pelayaran Nasional Bina Buana Raya Tbk
TCC Batavia Tower One 8th Floor, Suite 08-09 Jalan KH. Mas Mansyur Kav. 126
Phone : (021) 295 294 61, Fax : (021) 295 294 62, www.bbr.co.id



Sender Name                        Susanti Novita

Function                           Corporate Secretary

Date and Time                      27-08-2026 17:19

Attachment                         1. 3. KI Fakta Material Pembatalan Pemb PSV English.pdf


                                   2. 3. KI Fakta Material Pembatalan Pemb PSV Indo.pdf


 This is an official document of Pelayaran Nasional Bina Buana Raya Tbk that does not require a signature as it was
    generated electronically by the electronic reporting system. Pelayaran Nasional Bina Buana Raya Tbk is fully
                            responsible for the information contained within this document.


File

File Open PDF
Source IDX
Size0.01 MB
Published27 Aug 2026
Pages5
Characters10,180
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 4 people and organisations named in the text · linked when the evidence is strong

linked org Pelayaran Nasional Bina Buana Raya Tbk · Nama Perusahaan p.1 ×22
unresolved org Corporate Secretary Pelayaran Nasional Bina Buana Raya Tbk p.2 ×2
unresolved person KH. Mas Mansyur p.2 ×2
unresolved person Susanti Novita · Corporate Secretary p.2 ×2

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

↑↓ select ↵ open ⇧↵ see every result