Skip to content
Back to announcement

LK Konsolidasian Interim 30 Sept 2024.pdf

Financial statement Text extracted WSKT

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 226

Page 1
PT WASKITA KARYA (PERSERO) TBK                   PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                            AND ITS SUBSIDIARIES


LAPORAN KEUANGAN KONSOLIDASIAN INTERIM           INTERIM CONSOLIDATED FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2024 DAN 31 DESEMBER 2023 AS OF SEPTEMBER 30, 2024 AND DECEMBER 31, 2023
DAN UNTUK PERIODE-PERIODE SEMBILAN BULAN                   AND FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                   ENDED SEPTEMBER 30, 2024 AND 2023
Page 2
PT WASKITA KARYA (PERSERO) TBK                                         PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                  AND ITS SUBSIDIARIES
LAPORAN KEUANGAN KONSOLIDASIAN INTERIM                     INTERIM CONSOLIDATED FINANCIAL STATEMENTS
TANGGAL 30 SEPTEMBER 2024 DAN                                             AS OF SEPTEMBER 30, 2024 AND
31 DESEMBER 2023                                                                     DECEMBER 31, 2023
DAN UNTUK PERIODE SEMBILAN BULAN                                     AND FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                             ENDED SEPTEMBER 30, 2024 AND 2023




  Daftar Isi                                        Halaman/                                     Table of Contents
                                                     Pages


  Surat Pernyataan Direksi                                                               Directors’ Statement Letter

  Laporan Posisi Keuangan Konsolidasian Interim        1               Interim Consolidated Statements of Financial
                                                                                                           Position

  Laporan Laba Rugi dan Penghasilan Komprehensif       3           Interim Consolidated Statements of Profit or Loss
  Lain Konsolidasian Interim                                                     and Other Comprehensive Income

  Laporan Perubahan Ekuitas Konsolidasian Interim      4             Interim Consolidated Statements of Changes in
                                                                                                            Equity

  Laporan Arus Kas Konsolidasian Interim               5            Interim Consolidated Statements of Cash Flows

  Catatan atas Laporan Keuangan Konsolidasian          6         Notes to Interim Consolidated Financial Statements
  Interim
Page 3

          
Page 4
                                                                                       The original consolidated financial statements included herein are in
                                                                                                                                  the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                               PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN                                                                 INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM                                                                                             FINANCIAL POSITION
Tanggal 30 September 2024 dan 31 Desember 2023                                               As of September 30, 2024 and December 31, 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                        (Expressed in full Rupiah amount, unless otherwise stated)


                                                             30 September/               31 Desember/
                                                Catatan/   September 30, 2024         December 31, 2023*)
                                                 Notes            Rp                          Rp


ASET                                                                                                                                                             ASSETS
ASET LANCAR                                                                                                                                           CURRENT ASSETS
Kas dan Setara Kas                               5, 57            1.369.466.405.905        1.340.065.112.240                                  Cash and Cash Equivalents
Kas yang Dibatasi Penggunaannya                  5, 57            3.182.399.375.477        6.698.167.060.090                                              Restricted Cash
Investasi Jangka-Pendek                            6                  8.448.200.000            8.448.200.000                                      Short-Term Investments
Piutang Usaha Lancar - Bersih                                                                                                          Current Accounts Receivable - Net
   Pihak Berelasi                                7a, 57           1.936.382.406.718        1.290.292.316.124                                            Related Parties
   Pihak Ketiga                                    7a               497.406.678.294          630.063.661.675                                               Third Parties
Piutang Retensi Lancar - Bersih                                                                                                      Current Retention Receivables - Net
   Pihak Berelasi                                9a, 57           1.189.980.033.332        1.213.958.889.589                                            Related Parties
   Pihak Ketiga                                    9a               271.364.856.313          276.308.727.097                                               Third Parties
Piutang Lain-lain lancar - Bersih                                                                                                         Other Current Receivables - Net
   Pihak Berelasi                               10a, 57             755.583.857.048          969.400.717.289                                            Related Parties
   Pihak Ketiga                                   10a               305.351.561.986           52.759.431.675                                               Third Parties
Piutang Ventura Bersama                          8, 57              373.688.317.297          360.741.426.135                                    Joint Ventures Receivable
Persediaan - Bersih                               11              4.155.911.597.966        4.192.464.528.137                                             Inventories - Net
Tagihan Bruto Kepada Pengguna Jasa - Bersih                                                                                    Gross Amounts Due From Customers - Net
   Bagian Lancar                                                                                                                                        Current Portion
    Pihak Berelasi                               12, 57           3.208.352.863.572        3.322.024.421.101                                            Related Parties
    Pihak Ketiga                                   12             1.228.971.468.758        1.174.684.646.350                                               Third Parties
Aset Keuangan Atas Proyek Konsesi                                                                                              Financial Asset From Concession Project -
   Bagian Lancar                                  23                16.696.496.389            30.382.221.195                                            Current Portion
Pajak Dibayar Dimuka                              13a              886.858.161.073           621.103.612.176                                                Prepaid Taxes
Uang Muka dan Biaya Dibayar Dimuka                14               625.015.431.520           541.070.247.275                                 Advances and Prepayments
TOTAL ASET LANCAR                                                20.011.877.711.648       22.721.935.218.148                                 TOTAL CURRENT ASSETS

ASET TIDAK LANCAR                                                                                                                               NON-CURRENT ASSETS
Investasi Pada Entitas Asosiasi dan                                                                                                         Investment in Associates and
   Ventura Bersama                                15              3.783.368.865.286        2.323.013.265.928                                               Joint Ventures
Piutang Usaha Tidak Lancar - Bersih                                                                                               Non-Current Accounts Receivable - Net
   Pihak Berelasi                                7b, 57           1.378.429.046.574                         --                                              Related Party
Piutang Retensi Tidak Lancar - Bersih                                                                                           Non-Current Retention Receivables - Net
   Pihak Berelasi                                9b, 57            144.134.826.490                          --                                           Related Parties
Piutang Lain-lain Tidak Lancar - Bersih                                                                                             Other Non-Current Receivables - Net
   Pihak Berelasi                               10b, 57          10.125.695.719.855        8.850.420.182.701                                             Related Parties
Properti Investasi                                16                317.540.434.513          317.540.434.513                                        Investment Properties
Investasi Jangka Panjang Lainnya                  17                869.738.189.820          869.738.189.820                                Other Long-Term Investments
Aset Tetap - Bersih                               18              4.534.931.391.462        5.007.639.998.795                                            Fixed Assets - Net
Aset Hak Guna - Bersih                            19                  9.959.736.866           26.419.477.533                                     Right-of-Use Assets - Net
Goodwill                                          20              3.341.708.741.197        4.025.903.165.936                                                       Goodwill
Aset Tak Berwujud                                                                                                                                         Intangible Assets
   Hak Pengusahaan Jalan Tol                      22             42.119.156.940.187       49.392.544.270.327                              Toll Road Concession Rights
Aset Keuangan atas Proyek Konsesi                 23                203.598.387.538          213.771.102.177                    Financial Assets from Concession Project
Aset Pajak Tangguhan                              13d                13.396.668.204           14.103.253.810                                          Deferred Tax Assets
Aset Lain-lain                                    21              1.818.631.027.857        1.832.868.898.279                                                   Other Assets
TOTAL ASET TIDAK LANCAR                                          68.660.289.975.849       72.873.962.239.819                           TOTAL NON-CURRENT ASSETS
TOTAL ASET                                                       88.672.167.687.497       95.595.897.457.967                                             TOTAL ASSETS

*) Direklasifikasi pada Catatan 61                                                                                                            *) As reclassified in Note 61




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                       The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                        consolidated financial statements.


d6/February 5, 2014                                                     1                                                            paraf:
Page 5
                                                                                                The original consolidated financial statements included herein are in
                                                                                                                                           the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                                        PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                        AND ITS SUBSIDIARIES
LAPORAN POSISI KEUANGAN                                                                          INTERIM CONSOLIDATED STATEMENTS OF
KONSOLIDASIAN INTERIM                                                                                                      FINANCIAL POSITION
Tanggal 30 September 2024 dan 31 Desember 2023                                                        As of September 30, 2024 and December 31, 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                 (Expressed in full Rupiah amount, unless otherwise stated)



                                                                      30 September/             31 Desember/
                                                         Catatan/   September 30, 2024       December 31, 2023 *)
                                                          Notes            Rp                        Rp


LIABILITAS DAN EKUITAS                                                                                                                                      LIABILITIES AND EQUITY
LIABILITAS JANGKA PENDEK                                                                                                                                       CURRENT LIABILITIES
Utang Usaha                                                24            4.733.751.620.458         5.839.016.918.891                                                Accounts Payable
Utang Bank Jangka Pendek                                                                                                                                     Short-Term Bank Loans
   Pihak Ketiga                                            25             700.127.052.202           700.127.052.202                                                     Third Parties
Utang Lembaga Keuangan Non-Bank                                                                                                                Loan to Financial Institution Non-Bank
   Pihak Ketiga                                            26a              50.210.888.238            58.302.600.000                                                    Third Parties
Utang Bruto Subkontraktor Jangka Pendek                    27a           1.063.701.922.477         1.238.493.253.050                Short-Term Gross Amounts Due to Subcontractors
Biaya yang Masih Harus Dibayar                             29            3.904.842.093.877         3.326.419.315.615                                               Accrued Expenses
Utang Pajak Jangka Pendek                                  13b           1.903.762.376.049         2.600.232.783.777                                     Short-Term Taxes Payables
Uang Muka Kontrak Jangka Pendek                                                                                                                   Advances on Short-Term Contracts
   Pihak Berelasi                                         28, 57          176.585.362.074            12.652.378.380                                                 Related Parties
   Pihak Ketiga                                             28            678.001.096.116           823.918.531.988                                                     Third Parties
Liabilitas Jangka Panjang yang Jatuh Tempo                                                                                                                       Current Maturities of
   dalam Satu Tahun:                                                                                                                                         Long-Term Liabilities:
     Utang Bank                                            33            6.085.227.898.133         1.095.725.133.129                                                  Bank Loans
     Utang Lembaga Keuangan Non-Bank                       26b             10.404.445.428            10.404.445.428                            Loan to Financial Institution Non-Bank
     Liabilitas Sewa Guna Usaha                            37                1.979.510.649             7.157.455.725                                             Lease Liabilities
     Surat Utang Jangka Menengah                           30              250.000.000.000           250.000.000.000                                        Medium Term Notes
     Utang Obligasi - Bersih                               31            1.361.750.000.000         4.715.500.000.000                                        Bonds Payable - Net
Liabilitas Jangka Pendek Lainnya                           32              800.138.622.766         2.229.199.098.279                                      Other Short-Term Liabilities
TOTAL LIABILITAS JANGKA PENDEK                                          21.720.482.888.467       22.907.148.966.464                                   TOTAL CURRENT LIABILITIES
LIABILITAS JANGKA PANJANG                                                                                                                            NON-CURRENT LIABILITIES
Utang Bank Jangka Panjang                                                                                                                                   Long-Term Bank Loans
   Pihak Berelasi                                         33, 57        21.232.207.297.483       27.557.563.985.227                                              Related Parties
   Pihak Ketiga                                             33          18.426.647.839.432       18.485.772.857.399                                                 Third Parties
Utang Ventura Bersama Jangka Panjang                        34           1.642.144.840.411        1.332.247.776.159                              Long-Term Joint Venture Payables
Utang Lembaga Keuangan Non Bank Jangka Panjang                                                                                        Long-Term Non-Bank Financial Institution Loans
   Pihak Berelasi                                        26b, 57         5.083.668.808.391         4.685.856.201.641                                             Related Parties
   Pihak Ketiga                                            26b           1.120.380.469.499         1.030.714.139.727                                                Third Parties
Utang Bruto Subkontraktor Jangka Panjang                                                                                            Long-Term Gross Amounts Due to Subcontractors
   Pihak Ketiga                                            27b            473.426.919.811           449.220.116.865                                                 Third Parties
Uang Muka Kontrak Jangka Panjang                                                                                                                 Advances on Long-Term Contracts
   Pihak Berelasi                                         36, 57            7.283.008.022             7.283.008.022                                              Related Parties
   Pihak Ketiga                                             36            365.920.185.043           464.119.742.908                                                 Third Parties
Liabilitas Pajak Tangguhan                                 13d              9.142.879.459             7.147.603.151                                         Deferred Tax Liabilities
Utang Pajak Jangka Panjang                                 13b            263.800.089.757           283.619.686.764                                     Long-Term Taxes Payable
Utang Lain-lain Jangka Panjang                                                                                                                          Other Long-Term Payables
   Pihak Ketiga                                            35             305.695.207.801           310.522.632.588                                                 Third Parties
Liabilitas Jangka Panjang - Setelah Dikurangi                                                                                                               Long-Term Liabilities -
   Bagian Jatuh Tempo dalam Satu Tahun:                                                                                                              Net of Current Maturities:
     Liabilitas Sewa Guna Usaha                            37               11.941.638.206            20.781.049.872                                          Lease Liabilities
     Surat Utang Jangka Menengah                           30              527.945.758.287           485.727.511.026                                      Medium Term Notes
     Utang Obligasi - Bersih                               31            7.482.890.463.179         4.113.124.933.131                                     Bonds Payable - Net
Sukuk Mudharabah - Bersih                                  31            1.145.449.228.546         1.145.181.107.470                                      Sukuk Mudharabah - Net
Obligasi Wajib Konversi                                    38              709.627.176.598           651.812.439.998                                  Mandatory Convertible Bonds
Liabilitas Imbalan Kerja                                   39               52.338.928.838            56.542.148.396                                   Employee Benefit Liabilities
TOTAL LIABILITAS JANGKA PANJANG                                         58.860.510.738.763       61.087.236.940.344                             TOTAL NON-CURRENT LIABILITIES
TOTAL LIABILITAS                                                        80.580.993.627.230       83.994.385.906.808                                               TOTAL LIABILITIES

EKUITAS                                                                                                                                                                        EQUITY
Modal Saham                                                                                                                                                               Share Capital
Modal Saham - Nilai Nominal Rp 100 per Saham                                                                                               Share Capital - Rp 100 par Value per Share
  Modal Dasar - 1 Saham Seri A Dwi Warna dan                                                                                    Authorized Capital - 1 Dwi Warna Serie A Share and
    54.295.803.999 Saham Seri B pada 30 September 2024                                                                     54,295,803,999 Serie B Shares at September 30, 2024
    dan 31 Desember 2023                                                                                                                                 and December 31, 2023
  Modal Ditempatkan dan Disetor Penuh -                                                                                                           Subscribed and Fully Paid Capital
    1 Saham Seri A Dwi Warna dan 28.806.807.015                                                                                  1 Dwi Warna Serie A Share and 28,806,807,015
    Saham Seri B pada 30 September 2024                                                                                                    Serie B Shares at September 30, 2024
    dan 31 Desember 2023                                   40            2.880.680.701.600        2.880.680.701.600                                       and December 31, 2023
Tambahan Modal Disetor                                     41           13.642.597.077.556       13.565.914.226.785                                           Additional Paid-in Capital
Saldo Laba (Defisit)                                       42                                                                                               Retained Earnings (Deficit)
  Telah Ditentukan Penggunaannya                                         1.725.598.750.818         1.725.598.750.818                                                    Appropriated
  Belum Ditentukan Penggunaannya                                      (16.703.050.551.633)      (13.710.682.193.585)                                                 Unappropriated
Komponen Ekuitas Lainnya                                                   820.039.313.291           820.271.962.578                                       Other Components of Equity
Jumlah Ekuitas yang Dapat Diatribusikan                                                                                                                   Total Equity Attributable to
  Kepada Pemilik Perusahaan                                              2.365.865.291.632         5.281.783.448.196                                       Owners of the Company
Kepentingan Non-Pengendali                                 50            5.725.308.768.635         6.319.728.102.963                                          Non-Controlling Interests
JUMLAH EKUITAS                                                           8.091.174.060.267       11.601.511.551.159                                                    TOTAL EQUITY
JUMLAH LIABILITAS DAN EKUITAS                                           88.672.167.687.497       95.595.897.457.967                                TOTAL LIABILITIES AND EQUITY

*) Direklasifikasi pada Catatan 61                                                                                                                         *) As reclassified in Note 61




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                                The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                                 consolidated financial statements.


d6/February 5, 2014                                                             2                                                                   paraf:
Page 6
                                                                                      The original consolidated financial statements included herein are in
                                                                                                                                 the Indonesian language.


PT WASKITA KARYA (PERSERO) TBK                                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
LAPORAN LABA RUGI DAN                                                                 INTERIM CONSOLIDATED STATEMENTS OF
PENGHASILAN KOMPREHENSIF LAIN                                                                             PROFIT OR LOSS AND
KONSOLIDASIAN INTERIM                                                                         OTHER COMPREHENSIVE INCOME
Untuk Periode-periode Sembilan Bulan yang Berakhir pada                                             For the Nine Months Periods Ended
Tanggal 30 September 2024 dan 2023                                                                        September 30, 2024 and 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                     (Expressed in full Rupiah amount, unless otherwise stated)


                                                                   30 September/ September 30,
                                              Catatan/            2024                     2023
                                               Notes               Rp                       Rp


Pendapatan Usaha                               43, 57         6.783.377.647.077          7.816.462.003.648                                             Revenues
Beban Pokok Pendapatan                           44         (5.752.658.075.301)        (7.042.530.984.865)                                     Cost of Revenues
LABA BRUTO                                                   1.030.719.571.776            773.931.018.783                                       GROSS PROFIT

Beban Penjualan                                 45            (114.019.545.461)           (80.093.079.546)                                      Selling Expenses
Beban Umum dan Administrasi                     45          (1.055.686.844.680)        (1.219.515.396.567)                  General and Administrative Expenses
Beban - Non-contributing Plant                  46            (100.473.155.984)          (247.515.527.165)                     Non-contributing Plant - Expenses
Beban Pajak Final                                              (94.834.726.419)          (132.941.347.814)                                   Final Tax Expenses
Pendapatan Bunga                                                664.689.070.921            757.764.906.317                                        Interest Income
Keuntungan (Kerugian) Selisih Kurs - Bersih                      (1.548.099.476)             5.321.058.600                 Gain (Loss) on Foreign Exchange - Net
Pendapatan (Beban) Lain - lain - Bersih         47            (137.156.839.192)            510.914.823.302                         Other Income (Expense) - Net

LABA SEBELUM BEBAN KEUANGAN                                                                                             PROFIT BEFORE FINANCIAL CHARGES
  DAN RUGI BERSIH                                                                                                             AND EQUITY IN NET LOSS OF
   ENTITAS ASOSIASI DAN VENTURA BERSAMA                           191.689.431.485         367.866.455.910              ASSOCIATES AND JOINT VENTURES

Beban Keuangan                                  48          (3.458.919.538.316)        (3.169.529.872.152)                                      Finance Charges
Bagian Rugi Bersih                                                                                                                             Equity in Net Loss
  Entitas Asosiasi dan Ventura Bersama          49               (304.092.133.359)       (226.797.319.280)                     of Associates and Joint Ventures
RUGI SEBELUM PAJAK                                          (3.571.322.240.190)        (3.028.460.735.522)                                  LOSS BEFORE TAX

Beban Pajak Penghasilan                         13c               (43.169.807.777)       (206.201.790.587)                                 Income Tax Expenses
RUGI PERIODE BERJALAN                                       (3.614.492.047.967)        (3.234.662.526.109)                              LOSS FOR THE PERIOD

PENGHASILAN (BEBAN) KOMPREHENSIF LAIN                                                                                 OTHER COMPREHENSIVE INCOME (LOSS)
Pos-pos yang Tidak Akan                                                                                                       Items that Will Not Be Reclassified
  Direklasifikasi Kemudian ke Laba Rugi                                                                                         Subsequently to Profit or Loss
  Pengukuran Kembali Program                                                                                                        Remeasurement of Defined
    Imbalan Pasti - Bersih                                                      --                87.797.819                        Benefit Obligations - Net

Pos yang Akan Direklasifikasi                                                                                                    Item that May Be Reclassified
  Kemudian ke Laba Rugi                                                                                                        Subsequently to Profit or Loss
  Selisih Kurs Penjabaran                                                                                                 Exchange Differences on Transalation
    Laporan Keuangan dari Kegiatan                                                                                                of Financial Statements of
       Operasi Luar Negeri                                           (415.565.817)         (1.141.199.945)                             Foreign Operations

Total Beban Komprehensif Lain                                                                                                         Total Other Comprehensive
  Tahun Berjalan                                                     (415.565.817)         (1.053.402.126)                                   Loss For The Year
TOTAL RUGI KOMPREHENSIF                                                                                                         TOTAL COMPREHENSIVE LOSS
  PADA PERIODE BERJALAN                                     (3.614.907.613.784)        (3.235.715.928.235)                               FOR THE PERIOD


RUGI YANG DAPAT DIATRIBUSIKAN KEPADA:                                                                                                LOSS ATTRIBUTABLE TO:
 Pemilik Perusahaan                                         (3.002.298.222.784)        (2.834.191.951.779)                            Owners of the Company
 Kepentingan Non-Pengendali                     50            (612.193.825.183)          (400.470.574.330)                             Non-Controlling Interest

RUGI PERIODE BERJALAN                                       (3.614.492.047.967)        (3.234.662.526.109)                              LOSS FOR THE PERIOD

JUMLAH RUGI KOMPREHENSIF YANG DAPAT                                                                                             TOTAL COMPREHENSIVE LOSS
  DIATRIBUSIKAN KEPADA:                                                                                                                ATTRIBUTABLE TO:
    Pemilik Perusahaan                                      (3.002.713.788.601)        (2.835.245.353.905)                          Owners of the Company
    Kepentingan Non-Pengendali                  50            (612.193.825.183)          (400.470.574.330)                          Non-Controlling Interest

JUMLAH RUGI KOMPREHENSIF                                                                                                        TOTAL COMPREHENSIVE LOSS
  PADA PERIODE BERJALAN                                     (3.614.907.613.784)        (3.235.715.928.235)                               FOR THE PERIOD


Rugi per saham                                                                                                                                   Loss per share
 Dasar                                          51                        (104,22)                   (98,39)                                            Basic




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                     The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                      consolidated financial statements.


d6/February 5, 2014                                                     3                                                         paraf:
Page 7
                                                                                                                                                                                                                                                                    The original consolidated financial statements included herein are in
                                                                                                                                                                                                                                                                                                               the Indonesian language.

PT WASKITA KARYA (PERSERO) TBK                                                                                                                                                                                                         PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                                                                                                                                                                            AND ITS SUBSIDIARIES
LAPORAN PERUBAHAN EKUITAS KONSOLIDASIAN INTERIM                                                                                                                                                           INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
Untuk Periode Sembilan Bulan yang Berakhir 30 September 2024 dan 2023                                                                                                                                                  For the Nine Month Periods Ended September 30, 2024 and 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                                                                                                                                                             (Expressed in full Rupiah amount, unless otherwise stated)
                                                                                                                   Dapat Diatribusikan kepada Pemilik Entitas Induk/ Attributable to the Owners of the Company
                                                                                                                                                                                                    Komponen Ekuitas Lainnya/
                                                                                                                                                                                                    Other Components of Equity
                                                                           Tambahan Modal                    Saldo Laba (Defisit)/ Retained Earnings (Deficit)             Selisih Kurs Penjabaran        Surplus (Defisit)      Pengukuran kembali                                    Kepentingan
                                                                                Disetor/               Ditentukan          Belum Ditentukan                                   Laporan Keuangan/              Revaluasi/        liabilitas imbalan kerja/                              Non-Pengendali/        Jumlah Ekuitas/
                                                      Modal Saham/         Additional Paid-In        Penggunaannya/        Penggunaannya/                Jumlah/               Foreign Currency             Revaluation           Remeasurement of                 Jumlah/            Non-Controlling            Total
                                           Catatan/   Share Capital             Capital               Appropriated          Unappropriated                Total             Translation Adjustment        Surplus (Deficit)   employee benefit liability            Total                Interests              Equity
                                            Notes          Rp                     Rp                       Rp                       Rp                      Rp                         Rp                       Rp                         Rp                        Rp                      Rp                   Rp

SALDO PER 31 DESEMBER 2022                            2.880.680.701.600      13.565.914.226.785       1.725.598.750.818      (9.940.244.897.000)     (8.214.646.146.182)                  5.809.453.285   1.029.775.027.260             (168.188.151.335)        9.099.345.111.413     5.145.339.569.353     14.244.684.680.766             BALANCE AS OF DECEMBER 31, 2022

Kepentingan Non-Pengendali                   50                       --                        --                    --                      --                      --                             --                   --                                                     --    1.422.359.220.822       1.422.359.220.822                              Non-Controlling Interests
Rugi Periode Berjalan                                                 --                        --                    --     (2.834.191.951.779)     (2.834.191.951.779)                             --                   --                               --   (2.834.191.951.779)    (400.470.574.330)     (3.234.662.526.109)                                    Loss for the Period
Pengukuran Kembali Program Imbalan Pasti                                                                                                                                                                                                                                                                                                                  Remeasurement of Defined
  Bersih                                                              --                        --                    --            (87.797.819)            (87.797.819)                             --          87.797.819                                --                    --                     --                     --                   Benefits Obligations Plan - Net
Selisih Kurs Penjabaran Laporan Keuangan                                                                                                                                                                                                                                                                                                           Exchange Difference on translation
 dari Kegiatan Usaha Luar Negeri                                      --                        --                    --                      --                      --                (1.141.199.945)                   --                               --       (1.141.199.945)                     --       (1.141.199.945)    of Financial Statements of Foreign Operations
SALDO PER 30 SEPTEMBER 2023                           2.880.680.701.600      13.565.914.226.785       1.725.598.750.818     (12.774.524.646.598)    (11.048.925.895.780)                  4.668.253.340   1.029.862.825.079             (168.188.151.335)        6.264.011.959.689     6.167.228.215.845     12.431.240.175.534            BALANCE AS OF SEPTEMBER 30, 2023

SALDO PER 31 DESEMBER 2023                            2.880.680.701.600      13.565.914.226.785       1.725.598.750.818     (13.710.682.193.585)    (11.985.083.442.767)                  5.875.479.516   1.057.935.699.716             (243.539.216.654)        5.281.783.448.196     6.319.728.102.963     11.601.511.551.159             BALANCE AS OF DECEMBER 31, 2023

Kepentingan Non-Pengendali                   50                       --                        --                    --              53.427.783              53.427.783                             --                   --                               --            53.427.783        17.774.490.855         17.827.918.638                               Non-Controlling Interest
Rugi Periode Berjalan                                                 --                        --                    --     (3.002.298.222.784)     (3.002.298.222.784)                             --                   --                               --   (3.002.298.222.784)     (612.193.825.183)    (3.614.492.047.967)                                   Loss for the Period
Penyesuaian atas Perubahan Kepemilikan                                                                                                                                                                                                                                                                                                           Adjustment for Changes in Ownership
    Entitas Anak                             46                       --         76.682.850.771                       --         10.059.353.483          10.059.353.483                              --                   --                               --       86.742.204.254                      --       86.742.204.254                                    in Subsidiaries
Pengukuran Kembali Program Imbalan Pasti                                                                                                                                                                                                                                         --                                                                      Remeasurement of Defined
    Bersih                                                            --                        --                    --           (182.916.530)           (182.916.530)                             --                   --                  182.916.530                        --                     --                     --                       Benefits Obligations - Net
Selisih Kurs Penjabaran Laporan Keuangan                                                                                                                                                                                                                                                                                                       Exchange of Differences on translation
    dari Kegiatan Usaha Luar Negeri                                   --                        --                    --                      --                      --                  (415.565.817)                   --                               --        (415.565.817)                      --        (415.565.817)     of Financial Statements of Foreign Operations
SALDO PER 30 SEPTEMBER 2024                           2.880.680.701.600      13.642.597.077.556       1.725.598.750.818     (16.703.050.551.633)    (14.977.451.800.815)                  5.459.913.699   1.057.935.699.716             (243.356.300.124)        2.365.865.291.632     5.725.308.768.635      8.091.174.060.267            BALANCE AS OF SEPTEMBER 30, 2024




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                                                                                                                                                                                                         The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                                                                                                                                                                                                          consolidated financial statements.
d6/February 5, 2014                                                                                                                                                                   4                                                                                                                                                paraf:
Page 8
                                                                                   The original consolidated financial statements included herein are in
                                                                                                                              the Indonesian language.

PT WASKITA KARYA (PERSERO) TBK                                                             PT WASKITA KARYA (PERSERO) TBK
DAN ENTITAS ANAK                                                                                       AND ITS SUBSIDIARIES
LAPORAN ARUS KAS                                                                         INTERIM CONSOLIDATED STATEMENTS
KONSOLIDASIAN INTERIM                                                                                          OF CASH FLOWS
Untuk Periode Sembilan Bulan yang Berakhir                                                          For the Nine Month Periods Ended
30 September 2024 dan 2023                                                                              September 30, 2024 and 2023
(Disajikan dalam Rupiah penuh, kecuali dinyatakan lain)                                   (Expressed in full Rupiah amount, unless otherwise stated


                                                                    30 September/ September 30,
                                                Catatan/           2024                      2023
                                                 Notes              Rp                        Rp

ARUS KAS DARI AKTIVITAS OPERASI                                                                                      CASH FLOWS FROM OPERATING ACTIVITIES

Penerimaan Kas dari Pelanggan                                 5.703.559.429.350          10.008.558.138.689                           Cash Receipts from Customers
Pengeluaran Kas kepada Pemasok                              (6.571.473.687.209)          (7.263.580.436.594)                                  Cash Paid to Suppliers
Pengeluaran Kas kepada Karyawan dan Direksi                   (556.299.597.762)            (682.438.578.070)                    Cash Paid to Employees and Directors

Kas Dihasilkan dari (Digunakan untuk) Operasi               (1.424.213.855.621)            2.062.539.124.025                Cash Generated from (Used in) Operations
Pembayaran Beban Keuangan                                     (942.953.394.595)            (707.121.394.197)                            Payment of Finance Charges
Penerimaan Restitusi Pajak                        13             20.363.208.281               43.945.441.581                           Receipt from Tax Restitutions
Pembayaran Pajak                                            (1.159.527.212.030)          (1.504.917.675.922)                                      Payment of Taxes
Kas Bersih Digunakan untuk                                                                                                                         Net Cash Used in
 Aktivitas Operasi                                          (3.506.331.253.965)            (105.554.504.513)                                    Operating Activities

ARUS KAS DARI AKTIVITAS INVESTASI                                                                                     CASH FLOWS FROM INVESTING ACTIVITIES

Penerimaan dari Ventura Bersama                                    122.003.622.242            39.684.328.415                              Receipt from Joint Ventures
Penempatan pada Ventura Bersama                                   (72.036.196.810)          (74.044.192.874)                              Placement of Joint Ventures
Penempatan Deposito                                              (998.569.000.000)                         --                             Placement of Time Deposits
Penerimaan Pencairan Deposito                                      990.971.500.000                         --                             Receipt from Time Deposits
Perolehan Aset Tetap                                              (13.592.489.845)          (22.644.967.430)                               Acquisition of Fixed Assets
Penerimaan Penjualan Aset Tetap                                     24.109.935.497             5.587.366.250                       Proceed from Sale of Fixed Assets
Penerimaan atas Pengembalian Pinjaman                              501.122.999.825          184.168.799.025                           Receipt from Loans Repayment
Penerimaan atas Pelepasan Penyertaan                                                                                              Receipt from Disposal of Investment
 Pada Entitas Anak dan Asosiasi                                    755.330.988.463                        --                          In Subsidiaries and Associates
Perolehan Aset Tak Berwujud                                      (309.221.093.754)       (1.737.244.877.462)                           Acquisition of Intangible Assets
Pinjaman Diberikan kepada Entitas Asosiasi                       (270.000.000.000)         (191.819.722.900)                           Additional Loans to Associates
Kas Bersih (Digunakan untuk)                                                                                                                       Net Cash (Used in)
 Diperoleh dari Aktivitas Investasi                              730.120.265.618         (1.796.313.266.976)                       Provided by Investing Activities

ARUS KAS DARI AKTIVITAS PENDANAAN                                                                                     CASH FLOWS FROM FINANCING ACTIVITIES

Penerimaan Pendapatan Bunga                                      30.770.225.492                46.067.146.507                             Receipt from Interest Income
Pembayaran Beban Keuangan                                     (915.511.700.736)          (1.100.102.133.342)                             Payment for Finance Charges
Penerimaan Pinjaman Bank Jangka Pendek            53              5.000.000.000                12.000.000.000                    Receipt from Short-Term Bank Loans
Penerimaan Pinjaman Bank Jangka Panjang           53              1.114.900.000                 9.653.667.389                    Receipt from Long-Term Bank Loans
Pembayaran Pinjaman Bank Jangka Pendek            53            (5.000.000.000)              (24.923.303.844)                     Payment of Short-Term Bank Loans
Pembayaran Pinjaman Bank Jangka Panjang           53        (1.765.445.269.144)            (198.459.750.853)                       Payment of Long-Term Bank Loans
Penerimaan Pinjaman Lembaga Keuangan Non-Bank     53             98.887.833.204            1.066.530.678.438         Receipt from Non Bank Financial Institution Loans
Pembayaran Pinjaman Lembaga Keuangan Non-Bank     53            (8.327.931.762)              (42.879.685.528)                Payment to Financial Institution Non Bank
Penerimaan Pinjaman dari                                                                                                               Receipt of Other Payables from
 Pemegang Saham Non-Pengendali                               1.866.900.751.489                            --                            Non-controlling Shareholders
Pembayaran Utang Lain-lain                                   (141.174.076.398)                            --                                Payment of Other Payables
Penerimaan Setoran Modal Saham                                 375.026.000.000                            --                      Receipt from Share Capital Issuance
Pembayaran Liabilitas Sewa                       19, 53        (19.431.509.635)             (19.602.550.331)                               Payment of Lease Liabilities
Penerimaan Uang Jaminan Pelaksanaan                            138.503.195.028                            --           Receipt from Implementation Guarantee Money
Penempatan Uang Jaminan Pelaksanaan                                          --           (792.755.848.175)            Placement of Implementation Guarantee Money
Penurunan Kas yang Dibatasi Penggunaanya                     3.515.767.684.613            2.244.762.270.616                               Decrease in Restricted Cash
Kas Bersih                                                                                                                                        Net Cash Provided
 Diperoleh dari Aktivitas Pendanaan                          3.177.080.102.151            1.200.290.490.877                                  by Financing Activities

KENAIKAN (PENURUNAN) BERSIH KAS DAN                                                                                     NET INCREASE (DECREASE) IN CASH AND
 SETARA KAS                                                      400.869.113.804           (701.577.280.612)                             CASH EQUIVALENTS

PENGARUH PERUBAHAN KURS                                                                                                           EFFECT OF FOREIGN EXCHANGE
 MATA UANG ASING                                                     (988.175.607)           (6.504.837.604)                                    RATE CHANGE


EFEK DIVESTASI                                                   (370.479.644.532)                        --                               EFFECT OF DIVESTMENT


KAS DAN SETARA KAS                                                                                                                 CASH AND CASH EQUIVALENTS
 PADA AWAL PERIODE                                           1.340.065.112.240            2.221.378.055.019                        AT THE BEGINNING OF PERIOD

KAS DAN SETARA KAS                                                                                                                 CASH AND CASH EQUIVALENTS
 PADA AKHIR PERIODE                                3         1.369.466.405.905            1.513.295.936.803                              AT THE END OF PERIOD




Catatan terlampir merupakan bagian yang tidak terpisahkan dari                                The accompanying notes form an integral part of these
laporan keuangan konsolidasian.                                                                                 consolidated financial statements.
d6/February 5, 2014                                                       5                                                                  paraf:
Page 9
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

1. UMUM                                                       1.   GENERAL

   a.   Pendirian dan Informasi Umum                               a.   Establishment and General Information

        Entitas Negara Waskita Karya (“Perusahaan”)                     The State-owned entity Waskita Karya
        didirikan pada tanggal 1 Januari 1961                           (“the Company”) was established on January 1,
        berdasarkan Peraturan Pemerintah No. 62                         1961 based on Government Regulation No. 62
        tahun 1961, dari Perusahaan asing bernama                       year 1961, from a foreign company named
        "Volker Aanemings Maatschappij NV" yang                         "Volker Aanemings Maatschappij NV" which
        dinasionalisasi Pemerintah Republik Indonesia.                  was nationalized by the Government of
        Perusahaan       memulai    kegiatan    usaha                   the Republic of Indonesia. The Company started
        komersialnya pada tanggal 1 Januari 1961.                       its commercial operations on January 1, 1961.

        Berdasarkan Peraturan Pemerintah No. 40                         According to Government Regulation No. 40
        tahun 1970 status Perusahaan berubah dari                       year 1970, the Company’s status was changed
        Perusahaan Negara (PN) menjadi Perseroan                        from State Enterprise into Perseroan (Persero).
        (Persero). Selanjutnya, Perusahaan dinamakan                    Furthermore, the Company was named as
        PT Waskita Karya (Persero) berdasarkan Akta                     PT Waskita Karya (Persero) in accordance with
        Perseroan Terbatas No. 80 tanggal 15 Maret                      the Deed of Limited Liability Corporation No. 80
        1973, yang dibuat di hadapan Kartini Mulyadi,                   dated March 15, 1973 of Kartini Mulyadi, S.H.,
        S.H., Notaris di Jakarta. Akta Perseroan                        Notary in Jakarta. The deed was approved by
        Terbatas tersebut telah disahkan oleh Menteri                   the Minister of Law on August 20, 1973 in his
        Kehakiman pada tanggal 20 Agustus 1973                          Decree No. 4.a.5/310/3 and stated on State
        dengan Surat Keputusan No. 4.a.5/310/3 serta                    Gazette of Republic of Indonesia No. 82 on
        diumumkan dalam Berita Negara Republik                          November 13, 1973, Supplement No. 91.
        Indonesia No. 82 tanggal 13 November 1973,
        Tambahan Berita Negara No. 91.

        Anggaran Dasar Perusahaan telah beberapa                        The Company's Articles of Association has been
        kali mengalami perubahan, terakhir berdasarkan                  amended several times, most recently by
        akta notaris No. 6 tanggal 21 Januari 2022 yang                 notarial deed No. 6 dated January 21, 2022 by
        dibuat dihadapan Notaris Ashoya Ratam, S.H.,                    Notary Ashoya Ratam, S.H., M.Kn., in Jakarta,
        M.Kn., di Jakarta, yang telah mendapatkan                       which has obtained Approval for Amendment to
        Persetujuan Perubahan Anggaran Dasar                            the Company's Articles of Association
        Perseroan No. AHU-0014815.AH.01.11 tanggal                      No. AHU- 0014815.AH.01.11 dated January 21,
        21     Januari      2022     dan     Penerimaan                 2022 and Acceptance of Notification of
        Pemberitahuan Perubahan Anggaran Dasar dari                     Amendment to the Articles of Association from
        Kementerian Hukum dan Hak Asasi Manusia                         the Ministry of Law and Human Rights of
        Republik Indonesia No. AHU-AH.01.03-0048528                     the Republic of Indonesia No. AHU-AH.01.03-
        tanggal 22 Januari 2022. Anggaran Dasar                         0048528      dated     January      22,   2022.
        Perusahaan mengalami perubahan terkait pasal                    The Company's Articles of Association have
        4 ayat 2 dan 3 tentang persetujuan pemegang                     been amended related to article 4 paragraphs 2
        saham Perseroan untuk meningkatkan modal                        and 3 regarding approval of the Company's
        ditempatkan dan disetor sejumlah sejumlah                       shareholders to increase the issued and paid-up
        2.490.920.541 saham baru seri B yang                            capital by 2,490,920,541 new series B shares
        merupakan saham baru hasil pelaksanaan Hak                      which are new shares resulted from the exercise
        Memesan Efek Terlebih Dahulu, sehingga                          of Pre-emptive Rights, so that the new issued
        modal ditempatkan dan disetor dari yang                         and paid-up capital of the original amounting to
        semula sebesar Rp2.631.588.647.500 yang                         Rp2,631,588,647,500 which is divided into
        terbagi atas 26.315.886.475 lembar saham                        26,315 886,475 shares consisting of 1 Series A
        yang terdiri dari 1 saham Seri A Dwiwarna atau                  Dwiwarna share or equivalent to Rp100 and
        setara dengan Rp100 dan 26.315.886.474                          26,315,886.474 Series B shares or equivalent to
        saham      Seri    B    atau   setara     dengan                Rp2,631,588,647,400 to Rp2,880,680,701,600
        Rp2.631.588.647.400         menjadi      sebesar                which is divided into 28,806,807,016 shares
        Rp2.880.680.701.600       yang    terbagi    atas               consisting of 1 Dwiwarna Series A share or
        28.806.807.016 lembar saham yang terdiri dari                   equivalent to Rp100 and 28,806,807,015 Series
        1 saham Seri A Dwiwarna atau setara dengan                      B shares or equivalent to Rp2,880,680,701,500.
        Rp100 dan 28.806.807.015 saham Seri B atau
        setara dengan Rp2.880.680.701.500.

        Perusahaan berkedudukan di Jakarta, dengan                      The Company is domiciled in Jakarta, with
        kantor pusat beralamat di Jl. MT Haryono Kav.                   the head office located at Jl. MT Haryono Kav.
        No. 10 Cawang, Jakarta 13340.                                   No. 10 Cawang, Jakarta 13340.

                                                            -6-
Page 10
     PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
     DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
     CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
     KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
     UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
     YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
     DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
     (Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

        b.   Maksud dan Tujuan                                          b. Purposes and Objectives
c.
d.           Sesuai dengan pasal 3 Anggaran Dasar                            In accordance with article 3 of the Company’s
             Perusahaan, maksud dan tujuan Perusahaan                        Articles of Association, the objectives of
             adalah melakukan usaha di bidang industri                       the Company are to conduct business in
             konstruksi, industri pabrikasi, jasa penyewaan,                 construction industry, manufacturing industry,
             jasa keagenan, investasi, agro industri,                        leasing service, agency services, investment,
             pekerjaan         terintegrasi       (Engineering,              agro industry, integrated work (Engineering,
             Procurement       and      Construction:    EPC),               Procurement and Construction: EPC), trade,
             perdagangan, pengelolaan kawasan, layanan                       area management, construction improvement
             jasa peningkatan kemampuan di bidang                            services, information technology and tourism as
             konstruksi,     teknologi      informasi     serta              well as optimizing the utilization of resources
             kepariwisataan serta optimalisasi pemanfaatan                   owned by the Company to produce high quality
             sumber daya yang dimiliki Perusahaan untuk                      and strong competitive goods and/or services to
             menghasilkan barang dan/atau jasa yang                          gain/pursue profit to increase the Company's
             bermutu tinggi dan berdaya saing kuat, untuk                    value by applying the principles of Limited
             mendapat/mengejar           keuntungan       guna               Liability Company.
             meningkatkan       nilai   Perusahaan     dengan
             menerapkan prinsip-prinsip Perseroan Terbatas.
e.
f.           Untuk mencapai maksud dan tujuan tersebut di                    In order to achieve these objectives,
             atas, Perusahaan dapat melaksanakan kegiatan                    the Company engaged in activities such as
             usaha yaitu Pekerjaan pelaksanaan konstruksi,                   Construction execution work, mining services,
             jasa pertambangan, pekerjaan terintegrasi EPC,                  integrated EPC, design and build, building
             rancang bangun, manajemen gedung, pabrikasi                     management, building components and raw
             bahan dan komponen bangunan, pabrikasi                          material     fabrication,     component      and
             komponen dan peralatan konstruksi, pabrikasi                    construction tools fabrication, metals, woods,
             barang logam, kayu, karet dan plastik,                          rubber, and plastic fabrication, agency services
             penyewaan peralatan konstruksi, layanan jasa                    for raw materials, building components and
             keagenan bahan dan komponen bangunan                            construction equipment, investment and/or
             serta peralatan konstruksi, investasi dan/atau                  business management in area of basic facility
             pengelolaan usaha di bidang prasarana dan                       and infrastructure and industry, export-import,
             sarana dasar serta industri, ekspor-impor,                      general trading, system development, area
             perdagangan umum, system development,                           management, and property and realty
             pengelolaan kawasan, dan pengembangan                           development. In addition to the main business
             properti dan realti. Selain kegiatan usaha                      activities, the Company also carries out
             utama, Perusahaan juga melakukan kegiatan                       supporting business activities such as
             usaha pendukung yakni layanan jasa konsultasi                   management consulting services, conducting
             (konsultan) manajemen, melakukan usaha di                       business in the field of agro industry, and
             bidang argo industri, dan layanan jasa bidang                   information technology and tourism services.
             teknologi informasi dan kepariwisataan.
g.
h.           Kegiatan usaha Perusahaan yang saat ini telah                   The Company's current business activities are
             dijalankan    Perusahaan   adalah  kegiatan                     construction activities and integrated EPC.
             pelaksanaan     konstruksi  dan   pekerjaan
             terintegrasi EPC.

i.      c.   Penawaran Umum Saham                                       c.   Public Offering of Shares
j.
k.           Perusahaan                                                      The Company

l.           Pada tanggal 10 Desember 2012, Perusahaan                       On December 10, 2012, the Company’s obtained
             memperoleh pernyataan efektif dari Ketua                        an effective statement from the Chairman of the
             Badan Pengawas Pasar Modal dan Lembaga                          Capital Market and Financial Institution
             Keuangan (Bapepam-LK) berdasarkan surat                         Supervisory Agency (Bapepam-LK) through
             keputusan No. S-14012/BL/2012.                                  the decision letter No. S-14012/ BL/2012.
m.
n.           Pada tanggal 17 Desember 2012 berdasarkan                       On December 17, 2012, according to letter
             surat No. S-08414/BEI.PPJ/12-2012 Bursa Efek                    No.     S-08414/BEI.PPJ/12-2012, Indonesian
             Indonesia (BEI) menyetujui penawaran efek                       Stock Exchange (IDX) agreed to the public
             Perusahaan di BEI kepada masyarakat atas                        offering of the Company on IDX for
             3.082.315.000 saham biasa dengan nilai                          3,082,315,000 of common stock with the par

                                                                  -7-
Page 11
      PT WASKITA KARYA (PERSERO) Tbk                                          PT WASKITA KARYA (PERSERO) Tbk
      DAN ENTITAS ANAK                                                                      AND ITS SUBSIDIARIES
      CATATAN ATAS LAPORAN KEUANGAN                                       NOTES TO THE INTERIM CONSOLIDATED
      KONSOLIDASIAN INTERIM                                                              FINANCIAL STATEMENTS
      UNTUK PERIODE-PERIODE SEMBILAN BULAN                                        FOR THE NINE MONTHS PERIODS
      YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                              ENDED SEPTEMBER 30, 2024 AND 2023
      DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                      AND FOR THE YEAR ENDED DECEMBER 31, 2023
      (Disajikan dalam Rupiah, kecuali dinyatakan lain)               (Expressed in Rupiah, unless otherwise stated)

             nominal Rp100 per saham           dan   harga             value Rp100 per share and the offering price
             penawaran Rp380 per saham.                                Rp380 per share.
o.
p.           Dari jumlah saham yang ditawarkan dalam                   From the number of shares offered in the public
             penawaran umum kepada masyarakat sebesar                  offering of 6.25% or 192,644,000 of new
             6,25% atau sebanyak 192.644.000 saham biasa               ordinary shares is allocated to the employees
             atas nama baru dijatahkan kepada karyawan                 through the allocation shares program of
             Perusahaan melalui program penjatahan saham               the Company (Employee Stock Allocation/
             untuk pegawai Perusahaan (Employee Stock                  ESA).
             Allocation/ ESA).
q.
r.           Pada tanggal 19 Desember 2012, seluruh                    On December 19, 2012, a total of 9,632,236,000
             saham Perusahaan sebanyak 9.632.236.000                   shares of the Company were listed on the IDX.
             saham telah tercatat pada BEI. Pada tanggal 10            On June 10, 2015, the Company obtained an
             Juni 2015, Perusahaan memperoleh pernyataan               effective statement from The Board of
             efektif dari Dewan Komisioner Otoritas Jasa               Commissioners of the Financial Services
             Keuangan (OJK) atas                Pernyataan             Authority (OJK) of the Registration Statement in
             Pendaftaran dalam rangka Penawaran Umum                   the Limited Public Offering I (LPO I) through
             Terbatas I (PUT I) berdasarkan           surat            the decision letter No. S-238/D.04/2015.
             keputusan No. S-238/D.04/2015.
s.
t.           Pada tanggal 7 Juli 2015, seluruh saham                   On July 7, 2015, all the Company’s shares
             Perusahaan    melalui   PUT    I    sebanyak              through the LPO I amounting to 3,653,498,200
             3.653.498.200 saham telah tercatat pada BEI,              shares that have been listed in the IDX, bringing
             sehingga    jumlah    keseluruhan     saham               the number of shares of the Company after
             Perusahaan setelah PUT I menjadi sebesar                  the LPO I amounting to 13,567,473,560 shares.
             13.567.473.560 saham.
u.
             Pada tanggal 16 Desember 2021, Perusahaan                 On December 16, 2021, the Company obtained
             memperoleh pernyataan efektif dari Dewan                  an effective statement from the Board of
             Komisioner Otoritas Jasa Keuangan (OJK) atas              Commissioners of the Financial Services
             Pernyataan    Pendaftaran    dalam    rangka              Authority (OJK) on the Registration Statement
             Penawaran Umum Terbatas II (PUT II) Kepada                for the Limited Public Offering II (LPO II) to
             Para Pemegang Saham Perusahaam Dalam                      the Shareholders of the Company for the Pre-
             Rangka Hak Memesan Efek Terlebih Dahulu                   emptive Rights Order (HMETD) based on
             (HMETD)     berdasarkan    surat   keputusan              decision letter No. S-236/D.04/2021.
             No. S-236/D.04/2021.
v.
w.           Pada tanggal 30 Desember 2021, jumlah                     As of December 30, 2021, the total number of
             keseluruhan saham Perusahaan setelah hasil                shares of the Company after the results of
             pelaksanaan Hak Memesan Efek Terlebih                     the exercise of the Pre-emptive Rights shares
             Dahulu bagian dan disetor oleh Negara                     and is paid up by the Republic of Indonesia
             Republik    Indonesia  menjadi    sebesar                 amounting to 26,315,886,475 shares.
             26.315.886.475 saham.
x.
y.           Pada tanggal 6 Januari 2022, jumlah                       As of January 6, 2022, the total number of
             keseluruhan saham Perusahaan setelah hasil                shares of the Company after the results of the
             pelaksanaan Hak Memesan Efek Terlebih                     exercise of the Pre-emptive Rights shares and
             Dahulu bagian dan disetor oleh Masyarakat                 is paid up by Public amounting to
             menjadi sebesar 28.806.807.016 saham.                     28,806,807,016 shares.
z.
aa.          Berdasarkan Pengumuman Potensi Delisting                  Based on the Announcement of the Potential
             Perusahaan Tercatat PT Waskita Karya                      Delisting of Listed Company PT Waskita Karya
             (Persero) Tbk Tercatat di Papan Pemantauan                (Persero) Tbk which is Listed on the Special
             Khusus     No.   Peng-00019/BEI.PP3/05-2024               Monitoring Board No. Peng-00019/BEI.PP3/05-
             tanggal 8 Mei 2024, disampaikan bahwa saham               2024 dated May 8, 2024, it was announced that
             Perusahaaan telah disuspensi di seluruh pasar             the shares of the Company have been
             selama 12 bulan dan masa suspensi akan                    suspended in all markets for 12 months and
             mencapai 24 bulan pada tanggal 8 Mei 2025.                the suspension period will be extended for 24
                                                                       months until May 8, 2025.




                                                              -8-
Page 12
      PT WASKITA KARYA (PERSERO) Tbk                                           PT WASKITA KARYA (PERSERO) Tbk
      DAN ENTITAS ANAK                                                                       AND ITS SUBSIDIARIES
      CATATAN ATAS LAPORAN KEUANGAN                                        NOTES TO THE INTERIM CONSOLIDATED
      KONSOLIDASIAN INTERIM                                                               FINANCIAL STATEMENTS
      UNTUK PERIODE-PERIODE SEMBILAN BULAN                                         FOR THE NINE MONTHS PERIODS
      YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                               ENDED SEPTEMBER 30, 2024 AND 2023
      DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                       AND FOR THE YEAR ENDED DECEMBER 31, 2023
      (Disajikan dalam Rupiah, kecuali dinyatakan lain)                (Expressed in Rupiah, unless otherwise stated)

bb.          Entitas anak                                               Subsidiaries
             PT Waskita Beton Precast Tbk (WBP)                         PT Waskita Beton Precast Tbk (WBP)
             Pada tanggal 20 Mei 2016, Perusahaan                       On May 20, 2016, the Company obtained a
             memperoleh penetapan efek berupa efek                      determination of securities in the form of Islamic
             Syariah dari Dewan Komisioner Otoritas Jasa                securities from the Board of Commissioners of
             Keuangan (OJK) berdasarkan surat keputusan                 Indonesia Financial Services Authority (OJK)
             No. KCP.22/D.04/2016 untuk melakukan                       under the decree No. KCP.22/D.04/2016 for its
             penawaran umum perdana kepada masyarakat                   initial public offering of 10,544,463,000 shares
             atas 10.544.463.000 saham dengan nilai                     with a par value of Rp100 per share at
             nominal Rp100 per saham dengan harga                       the offering price of Rp490 per share.
             penawaran Rp490 per saham.

             Pada tanggal 8 September 2016, Perusahaan                  On September 8, 2016, the Company obtained
             memperoleh pemberitahuan pernyataan efektif                the notice of effectivity from OJK in its letter
             dari   OJK     dengan suratnya   No.    S-                 No. S-495/D.06/2016.
             495/D.06/2016.
             Pada tanggal 20 September 2016, Perusahaan                 On September 20, 2016, the Company has
             telah mencatatkan 40% atau sebanyak                        listed 40% or 10,544,463,000 new shares on
             10.544.463.000 saham baru pada Bursa Efek                  the Indonesia Stock Exchange. All shares
             Indonesia. Seluruh saham yang diterbitkan oleh             issued by the Company have been fully paid.
             Perusahaan telah disetor penuh.
             Pada tanggal 1 Agustus 2022, terdapat                      On August 1, 2022, there was an
             pengumuman Potensi Delisting Perusahaan                    announcement of the potential Delisting of
             Tercatat PT Waskita Beton Precast Tbk (WBP)                the Listed Company PT Waskita Beton Precast
             tercatat di Papan: Pengembangan No. Peng-                  Tbk (WBP) listed on the Board: Development
             00042/BEI.PP3/08-2022, telah disampaikan                   No. Peng-00042/BEI.PP3/08-2022, it has been
             bahwa saham Perusahaan telah disuspensi di                 conveyed that the shares of the Company have
             Pasar Modal selama 6 bulan dan masa                        been suspended in the Capital Market for 6
             suspensi akan mencapai 24 bulan sampai                     months and the suspension period will reach 24
             tanggal 31 Januari 2024.                                   months until January 31, 2024.
             Berdasarkan Pengumuman Potensi Delisting                   Based on the Announcement of the Potential
             Perusahaan Tercatat PT Waskita Beton Precast               Delisting of Listed Company PT Waskita Beton
             Tbk (WBP) Tercatat di Papan Pengembangan                   Precast Tbk (WBP) which is Listed on the Board
             No.   Peng-00010/BEI.PP3/01-2023      tanggal              Development No. Peng-00010/BEI.PP3/01-2023
             31 Januari 2023, disampaikan bahwa saham                   dated January 31, 2023, it was announced that
             Perusahaaan telah disuspensi di seluruh pasar              the shares of the Company have been
             selama 12 bulan dan masa suspensi akan                     suspended in all markets for 12 months and
             mencapai 24 bulan pada tanggal 31 Januari                  the suspension period will be extended for 24
             2024.                                                      months until January 31, 2024.
             Berdasarkan      Pengumuman        Pencabutan              Based on the Announcement of the Revocation
             Penghentian Sementara Perdagangan Efek                     of the Temporary Suspension of PT Waskita
             PT Waskita Beton Precast Tbk yang tercatat di              Beton Precast Tbk Securities Trading which is
             papan     Pengembangan       No.   Peng-UPT-               listed on the Development Board No. Peng-
             00005/BEI.PP3/03- 2023 tanggal 17 Maret                    UPT-00005/BEI.PP3/03-2023 dated March 17,
             2023, telah terpenuhinya kewajiban Perseroan,              2023, the Company's obligations have been
             maka Bursa Efek Indonesia (BEI) memutuskan                 fulfilled, and the Indonesia Stock Exchange
             untuk melakukan pencabutan pemberhentian                   (Bursa) has decided to revoke the temporary
             sementara Perdagangan Efek (Saham dan                      suspension of the Company's trading securities
             Obligasi) Perusahaan di seluruh pasar terhitung            (Shares and Bonds) throughout the market
             sejak Sesi II Perdagangan Efek pada Jumat,                 starting from Session II of Securities Trading on
             tanggal 17 Maret 2023.                                     Friday, March 17, 2023.

             Pada tanggal 30 September 2024 dan 31                      As of September 30, 2024 and December 31,
             Desember 2023 seluruh saham ditempatkan                    2023, all of the Company's outstanding shares
             Perusahaan telah dicatatkan pada Bursa Efek                have been listed on the Indonesia Stock
             Indonesia.                                                 Exchange.



                                                               -9-
Page 13
      PT WASKITA KARYA (PERSERO) Tbk                                                                                                       PT WASKITA KARYA (PERSERO) Tbk
      DAN ENTITAS ANAK                                                                                                                                   AND ITS SUBSIDIARIES
      CATATAN ATAS LAPORAN KEUANGAN                                                                                                    NOTES TO THE INTERIM CONSOLIDATED
      KONSOLIDASIAN INTERIM                                                                                                                           FINANCIAL STATEMENTS
      UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                     FOR THE NINE MONTHS PERIODS
      YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                           ENDED SEPTEMBER 30, 2024 AND 2023
      DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                   AND FOR THE YEAR ENDED DECEMBER 31, 2023
      (Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                            (Expressed in Rupiah, unless otherwise stated)


         d.   Penawaran Umum Obligasi dan Sukuk                                                                                  d. Public Offering Bonds and Sukuk
cc.
dd.           Perusahaan                                                                                                              The Company

              Perusahaan telah menerbitkan obligasi dengan                                                                            The Company has issued bonds for working
              tujuan untuk modal kerja dan pengembangan                                                                               capital and toll road development. The bonds
              jalan tol. Obligasi dicatatkan di BEI dengan                                                                            are listed on the IDX with the following details:
              rincian sebagai berikut:
                                                            Jumlah/
                                   Obligasi/                Amount             Tahun/               Tanggal Penerbitan/                    Jatuh Tempo/                                                        Wali Amanat/
              No                    Bonds                     Rp               Years                 Date of Issuance                        Due Date                              Status                       Trustee
               1    Berkelanjutan III Tahap II Seri B/
                    Shelf III Phase II Tranche B          2.276.500.000.000      16             23 Februari/ February 23, 2018    31 Desember/ December 31 , 2034    Belum Jatuh Tempo/ Outstanding       PT Bank Mega Tbk
               2    Berkelanjutan III Tahap III Seri B/
                    Shelf III Phase III Tranche B          941.750.000.000       16           28 September/ September 28, 2018    31 Desember/ December 31 , 2034    Belum Jatuh Tempo/ Outstanding       PT Bank Mega Tbk
               3    Berkelanjutan III Tahap IV Seri B/
                    Shelf III Phase IV Tranche B          1.361.750.000.000       5                 16 Mei/ May 16, 2019                16 Mei/ May 16, 2024         Sudah Jatuh Tempo/ Due Date          PT Bank Mega Tbk
               4    Berkelanjutan IV Tahap I/
                    Shelf IV Phase I                       135.500.000.000       14               6 Agustus/ August 6, 2020       31 Desember/ December 31 , 2034    Belum Jatuh Tempo/ Outstanding       PT Bank Mega Tbk
               5    Obligasi III Seri A/
                    Bond III Tranche A                     722.000.000.000        5           24 September/ September 24, 2021    24 September/ September 24, 2026   Belum Jatuh Tempo/ Outstanding       PT Bank Mega Tbk
               6    Obligasi III Seri B/
                    Bond III Tranche B                    1.051.000.000.000       7           24 September/ September 24, 2021    24 September/ September 24, 2028   Belum Jatuh Tempo/ Outstanding       PT Bank Mega Tbk
               7    Obligasi IV Seri A/
                    Bond IV Tranche A                      658.000.000.000        5                 12 Mei/ May 12, 2022                12 Mei/ May 12, 2027         Belum Jatuh Tempo/ Outstanding       PT Bank KB Bukopin Tbk
               8    Obligasi IV Seri B/
                    Bond IV Tanche B                      1.469.300.000.000       7                 12 Mei/ May 12, 2022                12 Mei/ May 12, 2029         Belum Jatuh Tempo/ Outstanding       PT Bank KB Bukopin Tbk


              Perusahaan      telah   menerbitkan sukuk                                                                               The Company has issued sukuk mudharabah
              mudharabah dengan tujuan untuk modal kerja                                                                              for working capital and toll road development
              dengan rincian sebagai berikut:                                                                                         with the following details:
                                                                Jumlah/
                                        Sukuk/                  Amount            Tahun/                Tanggal Penerbitan/                   Jatuh Tempo/                                                         Wali Amanat/
                   No                   Sukuk                     Rp              Years                  Date of Issuance                       Due Date                               Status                       Trustee

                   1    Sukuk Mudharabah I Seri A/             383.000.000.000            5             12 Mei/ May 12, 2022               12 Mei/ May 12, 2027         Belum Jatuh Tempo/ Outstanding       PT Bank KB Bukopin Tbk
                        Sukuk Mudharabah I Tranche A
                   2    Sukuk Mudharabah I Seri B/             765.100.000.000            7             12 Mei/ May 12, 2022               12 Mei/ May 12, 2029         Belum Jatuh Tempo/ Outstanding       PT Bank KB Bukopin Tbk
                        Sukuk Mudharabah I Tranche B



              WBP                                                                                                                     WBP

              WBP telah menerbitkan obligasi dengan rincian                                                                           WBP has issued bonds with the following details
              sebagai berikut:                                                                                                        are as follows:
                                                             Jumlah/
                                   Obligasi/                 Amount              Tahun/               Tanggal Penerbitan/                     Jatuh Tempo/                                                          Wali Amanat/
              No                      Bonds                     Rp               Years                  Date of Issuance                        Due Date                               Status                         Trustee


               1    Berkelanjutan I Tahap I/                500.000.000.000           3                 5 Juli/ July 5, 2019       Sesuai Ketentuan Skema Perdamaian/   Direstrukturisasi/ Restructured       PT Bank Mega Tbk
                                                                                                                                       According to the terms of the
                    Shelf I Phase I                                                                                                       reconciliation scheme
               2    Berkelanjutan I Tahap II/              1.500.000.000.000          3           30 Oktober/ October 30, 2019     Sesuai Ketentuan Skema Perdamaian/   Direstrukturisasi/ Restructured       PT Bank Mega Tbk
                                                                                                                                       According to the terms of the
                    Shelf I Phase II                                                                                                      reconciliation scheme



              Obligasi Berkelanjutan I Tahap I Tahun 2019                                                                             Sustainable Bonds I Phase I 2019
              Berdasarkan RUPO Berkelanjutan I Tahap I                                                                                Based on the Sustainable RUPO I Phase I of
              Tahun 2019 tanggal 15 Februari 2023, Para                                                                               2019 dated February 15, 2023, the Bondholders
              Pemegang Obligasi menyetujui dan memberikan                                                                             approved and authorized PT Bank Mega Tbk as
              kuasa kepada PT Bank Mega Tbk selaku Wali                                                                               Trustee of the Waskita Beton Precast
              Amanat Obligasi Berkelanjutan I Waskita Beton                                                                           Continuous Bond I Phase I of 2022 to make and
              Precast Tahap I Tahun 2022 untuk membuat dan                                                                            sign the Trustee Agreement for Waskita Beton
              menandatangani      Perjanjian   Perwaliamatan                                                                          Precast Mandatory Convertible Bond I In 2022,
              Obligasi Wajib Konversi Waskita Beton Precast I                                                                         it will be adjusted to the Peace Agreement
              Tahun 2022, untuk disesuaikan dengan                                                                                    which has been ratified (homologation) based
              Perjanjian Perdamaian yang telah disahkan                                                                               on the Commercial Court Decision at
              (homologasi) berdasarkan Putusan Pengadilan                                                                             the      Central   Jakarta    District  Court
              Niaga pada Pengadilan Negeri Jakarta Pusat                                                                              No.     497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT.
              No. 497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT.PST                                                                              PST dated 28 June 2022, which was then stated
              tanggal 28 Juni 2022, yang kemudian dituangkan                                                                          in Notarial Deed No 37 dated November 29,

                                                                                                                  - 10 -
Page 14
      PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
      DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
      CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
      KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
      UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
      YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
      DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
      (Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

              dalam Akta Notaris No 37 tanggal 29 November                    2023 from Notary Dewantari Handayani, S.H.,
              2023 dari Notaris Dewantari Handayani, S.H.,                    M.PA.,     concerning  Amendment        II  to
              M.PA., mengenai Perubahan II Perjanjian                         the Agreement Trustee of Waskita Concrete
              Perwaliamanatan Obligasi Wajib Konversi                         Precast I Mandatory Convertible Bonds in 2023.
              Waskita Beton Precast I Tahun 2023.
              Selanjutnya, berdasarkan pengumuman dari                        Furthermore, based on the Indonesian Stock
              Bursa     Efek   Indonesia    No.    Peng-P-                    Exchange     announcement      No.    Peng-P-
              01325/BEI.PP3/12/2023 tanggal 12 Desember                       01325/BEI.PP3/12/2023 dated 12 December
              2023 perihal Pencatatan Obligasi Wajib                          2023 concerning the Listing of Waskita Beton
              Konversi Waskita Beton Precast I Tahun 2023                     Precast Mandatory Convertible Bonds I in 2023
              dan Obligasi Wajib Konversi Waskita Beton                       and Mandatory Convertible Bonds of PT
              Precast II Tahun 2023 PT Waskita Beton                          Waskita Beton Precast II in 2023 Prakerja Tbk.
              Precast Tbk. (WSBP), Obligasi Wajib Konversi                    (WSBP), Waskita Beton Precast Mandatory
              Waskita Beton Precast I Tahun 2023                              Convertible Bonds I of 2023 (WSBP01CB) and
              (WSBP01CB) dan Obligasi Wajib Konversi                          Waskita Beton Precast Mandatory Convertible
              Waskita Beton Precast II Tahun 2023                             Bonds II of 2023 (WSBP02CB), were listed on
              (WSBP02CB), telah dicatatkan di Bursa tanggal                   the Stock Exchange on December 13, 2023.
              13 Desember 2023.

              Obligasi Berkelanjutan I Tahap II Tahun 2019                    Sustainable Bonds I Phase II 2019
              Berdasarkan RUPO Berkelanjutan I Tahap II                       Based on the Sustainable RUPO I Phase II of
              Tahun 2019 tanggal 15 Februari 2023, Para                       2019 dated February 15, 2023, the Bondholders
              Pemegang       Obligasi     menyetujui     dan                  approved and authorized PT Bank Mega Tbk as
              memberikan kuasa kepada PT Bank Mega Tbk                        Trustee of the Waskita Beton Precast
              selaku Wali Amanat Obligasi Berkelanjutan I                     Continuous Bond I Phase II of 2022 to make
              Waskita Beton Precast Tahap II Tahun 2022                       and sign the Trustee Agreement for Waskita
              untuk membuat dan menandatangani Perjanjian                     Beton Precast Mandatory Convertible Bond II In
              Perwaliamanatan Obligasi Wajib Konversi                         2022, it will be adjusted to the Peace Agreement
              Waskita Beton Precast I Tahun 2022, untuk                       which has been ratified (homologation) based
              disesuaikan dengan Perjanjian Perdamaian                        on the Commercial Court Decision at
              yang telah disahkan (homologasi) berdasarkan                    the     Central      Jakarta      District  Court
              Putusan Pengadilan Niaga pada Pengadilan                        No.     497/Pdt.Sus-PKPU/2021/PN.NIAGA.JKT
              Negeri Jakarta Pusat No. 497/Pdt.Sus-                           .PST dated June 28, 2022, which was then
              PKPU/2021/PN.NIAGA.JKT.PST tanggal 28                           stated in Notarial Deed No. 40 dated November
              Juni 2022, yang kemudian dituangkan dalam                       29, 2023 from Notary Dewantari Handayani,
              Akta Notaris No. 40 tanggal 29 November 2023                    S.H., M.PA., concerning Amendment II to
              dari Notaris Dewantari Handayani, S.H., MPA,                    the Agreement Trustee of Waskita Beton
              mengenai       Perubahan      II     Perjanjian                 Precast II Mandatory Convertible Bonds in
              Perwaliamanatan Obligasi Wajib Konversi                         2023.
              Waskita Beton Precast II Tahun 2023.
              Selanjutnya, berdasarkan pengumuman dari                        Furthermore, based on the Indonesian Stock
              Bursa     Efek   Indonesia    No.    Peng-P-                    Exchange     announcement        No.    Peng-P-
              01325/BEI.PP3/12/2023 tanggal 12 Desember                       01325/BEI.PP3/12/2023 dated 12 December
              2023 perihal Pencatatan Obligasi Wajib                          2023 concerning the Listing of Waskita Beton
              Konversi Waskita Beton Precast II Tahun 2023                    Precast Mandatory Convertible Bonds II in 2023
              PT Waskita Beton Precast Tbk. (WSBP),                           of PT Waskita Beton Precast II in 2023 (WSBP),
              Obligasi Wajib Konversi Waskita Beton Precast                   Waskita Beton Precast Mandatory Convertible
              II Tahun 2023 (WSBP02CB), telah dicatatkan di                   Bonds II of 2023 (WSBP02CB) were listed on
              Bursa tanggal 13 Desember 2023. Lihat catatan                   the Stock Exchange on December 13, 2023.
              31 dan 38.                                                      See notes 31 and 38.

         e.   Pengurus   dan        Struktur     Organisasi              e.   Management and Organization Structure of
              Perusahaan                                                      the Company
ee.           Pengurus Perusahaan                                             Management of the Company
              Berdasarkan akta notaris No. 49 tanggal                         According to the notarial deed No. 49 dated
              22 Mei 2024 yang dibuat dihadapan notaris                       May 22, 2024 of notary Ashoya Ratam, S.H.,
              Ashoya Ratam, S.H., M.Kn., menetapkan 6                         M.Kn., appointed 6 (six) directors of
              (enam) anggota direksi Perusahaan yaitu                         the Company consisting of a president director
              seorang direktur utama dan 5 (lima) direktur.                   and 5 (five) directors.

                                                                - 11 -
Page 15
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

       Susunan pengurus Dewan Komisaris dan                                 The composition of the Company’s Boards of
       Direksi Perusahaan pada tanggal 30 September                         Commissioners and Directors as of September
       2024 dan 31 Desember 2023 adalah sebagai                             30, 2024 and December 31, 2023 is as follows:
       berikut:

                                            30 September/                      31 Desember/
                                          September 30, 2024                 December 31, 2023
          Komisaris Utama/ Independen       Heru Winarko                       Heru Winarko            President/ Independent Commissioner
          Komisaris Independen              Muhamad Salim                      Muhamad Salim                   Independent Commissioners
                                           Addin Jauharudin                   Addin Jauharudin
                                                Muradi                             Muradi
          Komisaris                          T. Iskandar                        T. Iskandar                                Commissioners
                                          Dedi Syarif Usman                  Dedi Syarif Usman

                                            30 September/                      31 Desember/
                                          September 30, 2024                 December 31, 2023
          Direktur Utama                 Muhammad Hanugroho                Muhammad Hanugroho                            President Director

          Direktur                          Anton Rijanto                       Ratna Ningrum                                     Directors
                                           Wiwi Suprihatno                     Wiwi Suprihatno
                                           Rudi Purnomo                          Rudi Purnomo
                                             Ari Asmoko                  I Ketut Pasek Senjaya Putra
                                           Dhetik Ariyanto                      Dhetik Ariyanto



       Jumlah kompensasi yang diterima oleh Dewan                           The amount of compensation received by the
       Komisaris dan Direksi untuk periode – periode                        Board of Commissioners and Directors for the
       sembilan bulan yang berakhir 30 September                            nine months periods ended September 30, 2024
       2024 dan 2023 masing-masing sebesar                                  and 2023 amounting to Rp28,553,088,338 dan
       Rp28.553.088.338 dan Rp24.077.399.652.                               Rp24,077,399,652 respectively.

       Perusahaan dan entitas anak (Grup) memiliki                          The Company and its subsidiaries (Group) has
       karyawan tetap (tidak diaudit) masing-masing                         an average number of 2,274 and 2,361
       sebesar 2.274 dan 2.361 orang pada tanggal                           employees (unaudited) as of September 30,
       30 September 2024 dan 31 Desember 2023.                              2024 and December, 31 2023, respectively.

       Komite Audit                                                         Audit Committee

       Komite Audit Perusahaan diberhentikan dan                            The Company’s Audit Committee was dismissed
       diangkat melalui surat keputusan Dewan                               and appointed through the Decree of the Board
       Komisaris No. 35/SK/WK/DK/2024 tanggal 17                            of Commissioners No. 35/SK/WK/PEN/2024
       Mei 2024 mengenai Perpindahan dalam                                  dated May 17, 2024 regarding the role transfer
       Jabatan Komite Dewan Komisaris PT Waskita                            of board of commissioners committee members
       Karya (Persero) Tbk.                                                 of PT Waskita Karya (Persero) Tbk.

       Susunan Komite Audit Perusahaan pada                                 The composition of the Company’s Audit
       tanggal 30 September 2024 dan 31 Desember                            Committee as of September 30, 2024 and
       2023 adalah sebagai berikut:                                         December 31, 2023 are as follows:
                                              30 September/                      31 Desember/
                                            September 30, 2024                 December 31, 2023
          Ketua                             Muhammad Salim                     Muhammad Salim                                        Head

          Anggota                               Muradi                             Muradi                                        Members
                                                Subagio                       Prayudhi P Kesuma
                                             Mohamad Nasir                      Djoko Wibowo



       Komite Pemantau Manajemen Risiko                                     Risk Management Monitoring Comittee
       Komite Pemantau Manajemen Risiko diangkat                            The Risk Management Monitoring Committee
       melalui surat keputusan Dewan Komisaris                              was appointed through the decision letter of
       No. 35/SK/WK/DK/2024 tanggal 17 Mei 2024                             the      Board        of       Commissioners
       mengenai Perpindahan dalam Jabatan Komite                            No. 35/SK/WK/DK/2024 dated May 17, 2024
       Dewan Komisaris PT Waskita Karya (Persero)                           regarding the role transfer of board of
       Tbk.                                                                 commissioners    committee      members   of
                                                                            PT Waskita Karya (Persero) Tbk.


                                                               - 12 -
Page 16
PT WASKITA KARYA (PERSERO) Tbk                                                                            PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                          FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                        AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                 (Expressed in Rupiah, unless otherwise stated)

       Susunan Komite Pemantau Manajemen Risiko                                                      The composition of the Company’s Risk
       Perusahaan pada tanggal 30 September 2024                                                     Management Monitoring Committee as of
       dan 31 Desember 2023 adalah sebagai berikut:                                                  September 30, 2024 and December 31, 2023
                                                                                                     are as follows:
                                                                   30 September/                           31 Desember/
                                                                 September 30, 2024                      December 31, 2023
          Ketua                                                     T. Iskandar                             T. Iskandar                                           Head
          Anggota                                                Dedi Syarif Usman                       Dedi Syarif Usman                                     Members
                                                                  Dedy Gunawan                            Dedy Gunawan
                                                                  Djoko Wibowo                           Addin Jauharudin
                                                                                                          Mohamad Nasir

       Komite Nominasi dan Remunerasi                                                                Nomination and Remuneration Comittee
       Komite Nominasi dan Remunerasi diangkat                                                       The Nomination and Remuneration Committee
       melalui     surat     keputusan     Dewan                                                     was     appointed   through    the  decision
       Komisaris No. 38/SK/WK/DK/2024 tanggal                                                        letter of the Board of Commissioners
       28 Juni 2024 mengenai Pengangkatan Kembali                                                    No. 38/SK/WK/DK/2024 dated June 28, 2024
       Anggota Komite Nominasi dan Remunerasi.                                                       regarding the Reappointment of Members of the
                                                                                                     Nomination and Remuneration Committee.
       Susunan Komite Nominasi dan Remunerasi                                                        The composition of the Company’s Nomination
       Perusahaan pada tanggal 30 September 2024                                                     and Remuneration Committee as of September
       dan 31 Desember 2023 adalah sebagai berikut:                                                  30, 2024 and December 31, 2023 are as
                                                                                                     follows:
                                                                   30 September/                           31 Desember/
                                                                 September 30, 2024                      December 31, 2023
          Ketua                                                    Heru Winarko                            Heru Winarko                                           Head
          Anggota                                                     Zamroni                                Zamroni                                           Members
                                                                  Addin Jauharudin                       Addin Jauharudin

       Struktur Organisasi                                                                           Organization Structure
       Wilayah     kerja    Perusahaan      ditentukan                                               The Company’s work areas are according to
       berdasarkan      Surat   Keputusan       Direksi                                              the     Decision      Letter      of Directors
       No. 32/SK/WK/2024 tanggal 26 Juni 2024                                                        No. 32/SK/WK/2024 dated June 26, 2024
       tentang   Perubahan      Struktur   Organisasi                                                concerning Changes in the Organizational
       Perusahaan. Unit bisnis memiliki 2 (dua) divisi,                                              Structure of the Company. The business unit
       sebagai berikut:                                                                              have 2 (two) divisions, as follows:

                        Unit Bisnis/                                                     Wilayah Operasi/                                          Kedudukan/
                       Business Unit                                                       Work Areas                                               Location

          1. Divisi Operasi I/ Operation I Division
             a. Departemen Gedung/                    Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan                  Jakarta
                Building Department                   melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
                                                      untuk pekerjaan proyek gedung, bandara, Light Rail Transit (LRT), jalur kereta api,
                                                      pengembangan kawasan, dan lain-lain termasuk proyek-proyek investasi dan
                                                      pengembangan terpilih yang ditetapkan Direksi dengan nilai kontrak > Rp 100 Miliar.

                                                      Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
                                                      its activities in marketing to production for the entire building project for the works of
                                                      buildings, airports, Light Rail Transit (LRT), railway, area development, and others as
                                                      well as selected investment and development projects established by the Board of
                                                      Directors with contract value > Rp 100 Billion.

             b. Departemen Infrastruktur III/         Daerah operasional meliputi seluruh Indonesia dan Luar Negeri, berkedudukan di                 Jakarta
                Infrastructure III Department         Jakarta dengan melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai
                                                      dengan produksi untuk pekerjaan proyek-proyek seperti sistem penyedia air minum,
                                                      tempat pembuangan akhir, proyek infrastruktur swasta, proyek luar negeri, dan lain-lain
                                                      termasuk proyek-proyek investasi dan pengembangan terpilih yang ditetapkan oleh
                                                      Direksi, dengan nilai kontrak > Rp 100 Miliar.

                                                      Operational area covers the whole area of Indonesia and Overseas, domiciled in
                                                      Jakarta to perform its activities in marketing to production for projects such as drinking
                                                      water distribution system, landfills, private infrastructure projects, overseas projects,
                                                      and others as well as selected investment and development projects established by the
                                                      Board of Directors, with with contract value > Rp 100 Billion.




                                                                                   - 13 -
Page 17
PT WASKITA KARYA (PERSERO) Tbk                                                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                      (Expressed in Rupiah, unless otherwise stated)

                            Unit Bisnis/                                                    Wilayah Operasi/                                                Kedudukan/
                           Business Unit                                                      Work Areas                                                     Location



           2. Divisi Operasi II/ Operation II Division
              a. Departemen Infrastruktur I/           Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan                              Jakarta
                 Infrastructure I Department           melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
                                                       untuk pekerjaan proyek-proyek infrastruktur sipil non jalan dan jembatan seperti
                                                       bendungan, irigasi, bangunan air, pelabuhan, dermaga, pengaman pantai dan lain-lain
                                                       termasuk proyek-proyek investasi dan pengembangan terpilih yang ditetapkan oleh
                                                       Direksi dengan nilai kontrak > Rp 100 Miliar.

                                                        Operational area covers the whole are of Indonesia, domiciled in Jakarta to perform its
                                                        activities in marketing to production for non-road and bridge civil infrastructure
                                                        projects, such as dams, irrigation, water building, port, piers, revetment and others as
                                                        well as selected investment and development projects established by the Board of
                                                        Directors with contract value > Rp 100 Billion.

                                                        Daerah operasional meliputi seluruh Indonesia, berkedudukan di Jakarta dengan                             Jakarta
               b. Departemen Infrastruktur II/          melaksanakan kegiatan Perusahaan dalam bidang pemasaran sampai dengan produksi
                  Infrastructure II Department          untuk pekerjaan proyek-proyek infratruktur sipil jalan dan jembatan termasuk proyek-
                                                        proyek investasi dan pengembangan terpilih yang ditetapkan oleh Direksi dengan nilai
                                                        kontrak > Rp 100 Miliar.

                                                        Operational area covers the whole area of Indonesia, domiciled in Jakarta to perform
                                                        its activities in marketing to production for road and bridge civil infrastructure projects
                                                        such as road including selected investment and development projects established by
                                                        the Board of Directors with contract value > Rp 100 Billion.


   f.   Sekretaris Perusahaan                                                                       f.     Corporate Secretary

        Sekretaris Perusahaan diangkat melalui surat                                                       Corporate Secretary was appointed through the
        keputusan              Dewan           Direksi                                                     decision letter of the Board of Directors No.
        No. 67/SK/WK/PEN/2024 tanggal 28 Juni 2024                                                         67/SK/WK/PEN/2024 dated June 28, 2024
        mengenai Pemberhentian dan Pengangkatan                                                            regarding the Dismissal and Appointment of
        Pejabat Struktural. Perusahaan menetapkan Ny.                                                      Structural Officials. The Company appointed
        Ermy Puspa Yunita sebagai Sekretaris                                                               Mrs. Ermy Puspa Yunita as corporate secretary.
        Perusahaan.

   g.   Internal Audit                                                                              g. Internal Audit

        Internal Audit Perusahaan diangkat melalui                                                         The Company’s Internal Audit was appointed
        surat      keputusan       Dewan       Direksi                                                     through the decision letter of the Board of
        No.67/SK/WK/PEN/2024 tanggal 28 Juni 2024                                                          Directors No. 67/SK/WK/PEN/2024 dated June
        mengenai Pemberhentian dan Pengangkatan                                                            28, 2024 regarding the Dismissal and
        Pejabat Struktural. Perusahaan menetapkan Tn.                                                      Appointment      of   Structural    Officials.
        AS Wisnu Wijayanto sebagai Kepala Internal                                                         The Company appointed Mr. AS Wisnu
        Audit Perusahaan.                                                                                  Wijayanto as the Company's Head of Internal
                                                                                                           Audit.

   h.   Entitas Anak yang dikonsolidasi                                                             h. Consolidated Subsidiaries


                                                                                                                                             Sebelum Eliminasi/ Before Elimination
                                                                                                                                               30 September/ September 30, 2024
                                                                                                                        Persentase                                       Jumlah
                                                                                                                        Kepemilikan/                                  Rugi Bersih
                                                                                                                        Percentage                                 Periode Berjalan/
                                                                                                                            of              Jumlah Aset/            Total Net Loss
                    Entitas Anak/           Domisili/         Jenis Usaha/               Tahun Operasi Komersial/       Ownerships          Total Assets             for the Period
                    Subsidiaries           Domiciled       Nature of Business         Start of Commercial Operations        %                    Rp                        Rp
        PT Waskita Toll Road                Jakarta          Jalan Tol/ Toll Road                 2014                     92,53            59.683.666.537.721          (890.670.380.242)
        PT Waskita Beton Precast Tbk        Jakarta           Industri Pabrikasi/                 2014                     29,17             3.806.129.966.300          (640.657.541.432)
                                                                 Fabrication
        PT Waskita Karya Realty             Jakarta           Properti/ Property                  2015                     99,99             6.169.541.525.233           (99.861.217.144)
        PT Waskita Karya Infrastruktur      Jakarta         Industri Pabrikasi dan                2016                     99,99               662.958.524.974           (39.002.774.327)
                                                         Investasi/ Fabrication and
                                                                 Investment




                                                                                      - 14 -
Page 18
PT WASKITA KARYA (PERSERO) Tbk                                                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                       (Expressed in Rupiah, unless otherwise stated)

                                                                                                                                        Sebelum Eliminasi/ Before Elimination
                                                                                                                                          31 Desember/ December 31, 2023
                                                                                                                        Persentase                               Jumlah Laba
                                                                                                                        Kepemilikan/                             (Rugi) Bersih
                                                                                                                        Percentage                            Periode Berjalan/
                                                                                                                            of         Jumlah Aset/        Total Net Income (Loss)
                    Entitas Anak/             Domisili/        Jenis Usaha/               Tahun Operasi Komersial/      Ownerships     Total Assets               for the Year
                    Subsidiaries             Domiciled      Nature of Business         Start of Commercial Operations       %               Rp                         Rp
        PT Waskita Toll Road                  Jakarta         Jalan Tol/ Toll Road                 2014                    92,53       65.025.812.033.575        (1.245.399.088.097)
        PT Waskita Beton Precast Tbk          Jakarta          Industri Pabrikasi/                 2014                    29,36        4.473.145.720.673              6.300.283.811
                                                                  Fabrication
        PT Waskita Karya Realty               Jakarta          Properti/ Property                  2015                    99,99       6.144.998.933.686           (125.751.736.370)
        PT Waskita Karya Infrastruktur        Jakarta        Industri Pabrikasi dan                2016                    99,99         694.483.212.462           (142.597.295.810)
                                                          Investasi/ Fabrication and
                                                                  Investment


        Kepemilikan Tidak Langsung Melalui Entitas Anak                                                                                     Inderect Ownership Through Subsidiaries
                                                                                                                                        Sebelum Eliminasi/ Before Elimination
                                                                                                                                          30 September/ September 30, 2024
                                                                                                                        Persentase                               Jumlah Laba
                                                                                                                        Kepemilikan/                             (Rugi) Bersih
                                                                                                                        Percentage                            Periode Berjalan/
                                                                                                                            of         Jumlah Aset/        Total Net Income (Loss)
                    Entitas Anak/             Domisili/        Jenis Usaha/               Tahun Operasi Komersial/      Ownerships     Total Assets             for the Period
                    Subsidiaries             Domiciled      Nature of Business         Start of Commercial Operations       %               Rp                        Rp
        PT Pemalang Batang Toll Road          Jakarta        Jalan Tol/ Toll Road                  2018                    60,00        7.556.917.159.654           (226.198.255.306)
        PT Waskita Sriwijaya Tol             Palembang       Jalan Tol/ Toll Road                  2020                    99,78       18.256.564.190.734            (84.204.382.703)
        PT Waskita Bumi Wira                   Gresik        Jalan Tol/ Toll Road                  2020                    99,94       12.068.305.256.927           (410.049.085.882)
        PT Waskita Transjawa Toll Road        Jakarta        Jalan Tol/ Toll Road                  2015                    88,08        8.851.314.004.372            (36.106.067.198)
        PT Transjawa Paspro jalan Tol         Jakarta        Jalan Tol/ Toll Road                  2019                    99,99        5.833.529.985.951           (209.842.655.769)
        PT Tol Teluk Balikpapan              Balikpapan      Jalan Tol/ Toll Road       Dalam Tahap Pengembangan/                          34.287.150.863                   (212.332)
                                                                                                                           60,00
                                                                                            Development Stage
        PT Waskita Fim Perkasa Realti          Jakarta        Properti/ Property                   2018                    90,00        1.307.061.106.811             (6.248.995.592)
        PT Waskita Modern Realty               Jakarta        Properti/ Property                   2018                    60,00          483.540.032.302             (5.777.407.394)
        PT Waskita Sangir Energi               Jakarta         Energi/ Energy                      2016                    94,70          259.255.985.212            (16.870.765.941)
        PT Waskita Wado Energi                 Jakarta         Energi/ Energy           Dalam Tahap Pengembangan/          99,99           35.653.505.634                     683.176
                                                                                            Development Stage

                                                                                                                                        Sebelum Eliminasi/ Before Elimination
                                                                                                                                          31 Desember/ December 31, 2023
                                                                                                                        Persentase                               Jumlah Laba
                                                                                                                        Kepemilikan/                             (Rugi) Bersih
                                                                                                                        Percentage                            Periode Berjalan/
                                                                                                                            of         Jumlah Aset/        Total Net Income (Loss)
                    Entitas Anak/             Domisili/        Jenis Usaha/               Tahun Operasi Komersial/      Ownerships     Total Assets               for the Year
                    Subsidiaries             Domiciled      Nature of Business         Start of Commercial Operations       %               Rp                         Rp
        PT Trans Jabar Tol                    Jakarta        Jalan Tol/ Toll Road                  2019                    99,99        7.117.431.376.183            (50.672.946.454)
        PT Pemalang Batang Toll Road          Jakarta        Jalan Tol/ Toll Road                  2018                    60,00        7.649.490.396.594           (407.032.827.783)
        PT Waskita Sriwijaya Tol             Palembang       Jalan Tol/ Toll Road                  2020                    99,69       18.273.873.876.334           (165.203.000.402)
        PT Waskita Bumi Wira                   Gresik        Jalan Tol/ Toll Road                  2020                    99,92       12.063.133.857.684           (611.983.219.075)
        PT Waskita Transjawa Toll Road        Jakarta        Jalan Tol/ Toll Road                  2015                    88,08        9.003.418.799.067              86.254.151.866
        PT Transjawa Paspro jalan Tol         Jakarta        Jalan Tol/ Toll Road                  2019                    99,99        5.829.644.855.853           (328.759.088.323)
        PT Tol Teluk Balikpapan              Balikpapan      Jalan Tol/ Toll Road       Dalam Tahap Pengembangan/                          33.747.952.782                     321.277
                                                                                                                           60,00
                                                                                            Development Stage
        PT Waskita Fim Perkasa Realti          Jakarta        Properti/ Property                   2018                    90,00        1.322.056.758.529              11.516.286.296
        PT Waskita Modern Realty               Jakarta        Properti/ Property                   2018                    60,00          482.259.192.642             (7.975.482.311)
        PT Waskita Sangir Energi               Jakarta         Energi/ Energy                      2016                    94,70          286.478.867.860            (70.450.662.535)
        PT Waskita Wado Energi                 Jakarta         Energi/ Energy           Dalam Tahap Pengembangan/          99,99           34.509.075.193             (2.098.306.683)
                                                                                            Development Stage


       PT Waskita Toll Road (WTR)                                                                           PT Waskita Toll Road (WTR)
       Pendirian WTR (entitas anak) adalah sesuai                                                           The establishment of WTR (subsidiary) was
       dengan akta notaris No. 62 tanggal 19 Juni                                                           based on notarial deed No. 62 dated June 19,
       2014 dari notaris Fathiah Helmi, S.H. Akta                                                           2014 of notary Fathiah Helmi, S.H. The deed
       pendirian ini telah mendapat persetujuan oleh                                                        was approved by the Minister of Law        and
       Menteri Hukum dan Hak Asasi Manusia melalui                                                          Human     Rights    through the decision letter
       surat keputusan No. AHU-14734. 40.10.2014                                                            No. AHU-14734.40.10. 2014 dated June 25,
       tanggal 25 Juni 2014.                                                                                2014.
       Anggaran Dasar WTR telah beberapa kali                                                               WTR's Articles of Association have been
       mengalami perubahan, terakhir berdasarkan                                                            amended several times, most recently based on
       akta notaris No. 12 tanggal 27 Januari 2023                                                          notarial deed No. 12 dated January 27, 2023 by
       oleh Zulkifli Harahap, S.H., dimana Perusahaan                                                       Zulkifli Harahap, S.H., wherein the Company
       meningkatkan modal ditempatkan dan disetor                                                           increased its issued and paid- up capital in WTR
       kepada WTR sebesar Rp762.777.735.984                                                                 amounting       to    Rp762,777,735,984       so
       sehingga kepemilikan Perusahaan berubah                                                              the Company ownership change to 92.53%.
       menjadi 92,53%.

                                                                                       - 15 -
Page 19
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)


       Entitas anak yang berada dibawah WTR                                The subsidiaries under WTR are as follows:
       sebagai berikut:
        i.    PT Pemalang Batang Tol Road (PBTR)                           i.    PT Pemalang Batang Tol Road (PBTR)

              Pendirian     PBTR,   (kepemilikan   tidak                         The establishment of PBTR, (indirect
              langsung melalui WTR) adalah sesuai                                ownership through WTR) was based on
              dengan akta notaris No. 10 tanggal 15 Juni                         notarial deed No. 10 dated June 15, 2006
              2006 dari notaris Bonardo Nasution S.H.                            of notary Bonardo Nasution, S.H. The
              Akta pendirian ini telah mendapat                                  deed was approved by the Minister of
              persetujuan dari Menteri Hukum dan Hak                             Law and Human Rights through the
              Asasi Manusia melalui surat keputusan                              decision      letter    No.     C-20478
              No. C-20478 HT.01.01.Tahun 2006 tanggal                            HT.01.01.Tahun 2006 dated July 13,
              13 Juli 2006.                                                      2006.

              Selanjutnya peralihan pemegang saham                               The change in ownership of PBTR to
              PBTR ke dalam WTR berdasarkan akta                                 WTR was based on notarial deed No. 57
              notaris No. 57 tanggal 15 Februari 2016                            dated February 15, 2016 of notary Jose
              dari notaris Jose Dima Satria S.H., M.Kn.                          Dima Satria S.H., M.Kn. The deed was
              Akta ini telah mendapat persetujuan oleh                           approved by Minister of Law and Human
              Menteri Hukum dan Hak Asasi Manusia                                Rights through the decision letter
              melalui surat keputusan No. AHU-                                   No. AHU-AH.01.03-0982070.
              AH.01.03-0982070.

              Anggaran Dasar PBTR telah beberapa kali                            PBTR's Articles of Association has been
              mengalami         perubahan,          terakhir                     amended several times, most recently by
              berdasarkan akta notaris No. 46 tanggal 21                         notarial deed No. 46 on December 21,
              Desember 2018 dari notaris Catur Virgo                             2018 of notary Catur Virgo, S.H., M.H.,
              S.H., M.H., yang telah disetujui oleh Menteri                      which has been approved by the Minister
              Hukum dan Hak Asasi Manusia dengan                                 of Law and Human Rights through the
              Surat       Keputusan        No.        AHU-                       Decision      Letter     No.       AHU-
              0177882.AH.01.11. Tahun 2018 tanggal 27                            0177882.AH.01.11.Tahun 2018 dated
              Desember 2018.                                                     December 27, 2018.

        ii.   PT Waskita Sriwijaya Tol (WST)                               ii.   PT Waskita Sriwijaya Tol (WST)
              Pendirian WST (kepemilikan tidak langsung                          The establishment of WST (indirect
              melalui WTR) adalah sesuai dengan akta                             ownership through WTR) was based on
              notaris No. 51 tanggal 18 November 2011                            notarial deed No. 51 dated November 18,
              dari notaris Ilmiawan Dekrit Supatmo S.H.,                         2011 of notary Ilmiawan Dekrit Supatmo
              M.H. Akta pendirian ini telah mendapat                             S.H., M.H. This notarial deed was
              pengesahan Menteri Hukum dan Hak Asasi                             approved by the Minister of Law and
              Manusia sesuai dengan Surat Keputusan                              Human Rights through the decision
              No. AHU- 56876.A.H.01.01.Tahun 2011                                letter No. AHU- 56876.A.H.01.01. Tahun
              tanggal 21 November 2011.                                          2011, dated November 21, 2011.
              Anggaran Dasar WST telah beberapa                                  WST's Articles of Association has been
              kali   mengalami     perubahan,   terakhir                         amended several times, most recently
              berdasarkan Keputusan para pemegang                                Based on the decision of the
              saham diluar Rapat Umum Pemegang                                   shareholders outside the Extraordinary
              Saham Luar Biasa PT WST yang diaktakan                             General Meeting of Shareholders of PT
              melalui Akta Notaris No. 11 tanggal 9 Juli                         WST which was notarized through
              2024 yang dibuat dihadapan Ir. Nanette                             Notarial Deed No. 11 dated July 9, 2024
              Cahyanie Handari Adi Warsito S.H., Notaris                         which was made in the presence Ir.
              di Jakarta, bahwa WTR selaku pemegang                              Nanette Cahyanie Handari Adi Warsito
              saham mayoritas menyetujui peningkatan                             S.H., Notary in Jakarta. That WTR as
              modal ditempatkan dan disetor sebesar                              the majority shareholder has approved
              Rp9.873.000.000. Akta ini telah mendapat                           increase the issued and paid-up capital
              persetujuan oleh Menteri Hukum dan Hak                             amounting to Rp9,873,000,000. This
              Asasi Manusia Republik Indonesia melalui                           deed has been approved by the Minister
              surat No. AHU-AH.01.03-0170697 tanggal                             of Law and Human Rights of the Republic
              11 Juli 2024. Atas peningkatan modal                               of Indonesia through letter No. AHU-
              ditempatkan dan disetor tersebut, maka                             AH.01.03-0170697 dated July 11, 2024.

                                                               - 16 -
Page 20
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)

               prosentase kepemilikan WTR        di   WST                        Due to the increase in issued and paid-up
               menjadi sebesar 99,78%.                                           capital, WTR's ownership percentage in
                                                                                 WST will be 99.78%.

        iii.   PT Waskita Bumi Wira (WBW)                                 iii.   PT Waskita Bumi Wira (WBW)

               WBW (kepemilikan tidak langsung melalui                           WBW (indirect ownership through WTR)
               WTR) didirikan berdasarkan Akta No. 48                            was established based on Deed No. 48
               tanggal 20 Agustus 2014 oleh Jose Dima                            dated August 20, 2014 by Jose Dima
               Satria, S.H., M.Kn., Notaris di Jakarta, dan                      Satria, S.H., M.Kn., Notary in Jakarta,
               telah mendapatkan pengesahan dari                                 and has been approved by the Minister of
               Menteri Hukum dan dan Hak Asasi                                   Law and Human Rights through decision
               Manusia       sesuai     dengan        Surat                      letter No. AHU-22261.40.10.2014, dated
               Keputusan No. AHU-22261.40.10.2014,                               August 28, 2014.
               tanggal 28 Agustus 2014.

               WTR memiliki penyertaan sebesar 48%                               WTR had an initial ownership interest of
               atas modal disetor WBW (kepemilikan tidak                         48% on the paid up capital of WBW
               langsung melalui WTR) atau sebesar                                (indirect ownership through WTR)
               Rp7.500.000.000, berdasarkan akta notaris                         amounting to Rp7,500,000,000, based on
               Jose Dima Satria, S.H., M.Kn., No. 43                             the notarial deed of Jose Dima Satria,
               tanggal 28 Oktober 2014.                                          S.H., M.Kn., No. 43 dated October 28,
                                                                                 2014.

               Anggaran Dasar WBW telah beberapa kali                            WBW's Articles of Association has been
               mengalami        perubahan,         terakhir                      amended several times, most recently
               berdasarkan Keputusan para pemegang                               based      on     the     decision     of
               saham di luar Rapat Umum Pemegang                                 the     shareholders      outside    the
               Saham Luar Biasa WBW yang diaktakan                               Extraordinary    General    Meeting   of
               melalui Akta Notaris No. 21 tanggal 10 Juni                       Shareholders of WBW which was
               2024 yang dibuat dihadapan Ir. Nanette                            notarized through Notary Deed No. 21
               Cahyanie Handari Adi Warsito S.H., Notaris                        dated June 10, 2024 by Ir. Nanette
               di Jakarta, bahwa WTR selaku pemegang                             Cahyanie Handari Adi Warsito S.H.,
               saham mayoritas menyetujui peningkatan                            Notary in Jakarta, that WTR as
               modal ditempatkan dan disetor sebesar                             the majority shareholder has approved to
               Rp1.728.620.000.000.     Akta ini      telah                      increase the issued and paid-up capital
               mendapat persetujuan oleh Menteri Hukum                           amounting to Rp1,728,620,000,000. This
               dan Hak Asasi Manusia Republik Indonesia                          deed has been approved by the Minister
               melalui           surat           No.AHU-                         of Law and Human Rights of the Republic
               0036080.AH.01.02.TAHUN 2024 tanggal 19                            of Indonesia through letter No.AHU-
               Juni 2024. Atas peningkatan modal                                 0036080.AH.01.02.TAHUN 2024 dated
               ditempatkan dan disetor tersebut, maka                            June 19, 2024. Due to the increase in
               prosentase kepemilikan WTR di WBW                                 issued and paid-up capital, WTR's
               menjadi sebesar 99,94%.                                           ownership percentage in WBW will be
                                                                                 99.94%.


        iv.    PT Waskita Transjawa Toll Road (WTTR)                      iv.    PT Waskita     Transjawa     Toll   Road
                                                                                 (WTTR)

               Pendirian PT Waskita MNC Transjawa Toll                           The establishment of PT Waskita MNC
               Road (kepemilikan tidak langsung melalui                          Transjawa Toll Road (indirect ownership
               WTR) adalah sesuai dengan akta notaris                            through WTR) was based on notarial
               Fathiah Helmi, S.H., No. 25 tanggal                               deed No. 25 dated September 28, 2015
               28 September 2015. Akta pendirian ini telah                       of notary Fathiah Helmi, S.H., This
               mendapat pengesahan Menteri Hukum dan                             notarial deed has been approved by
               Hak Asasi Manusia sesuai dengan                                   The Minister of Law and Human Rights
               Surat Keputusan No. AHU-2458481.AH.01.                            through decision letter No. AHU-
               01.TH.2015 tanggal 29 September 2015.                             2458481.AH.01.01.TH.2015         dated
               No.    AHU-2458481.    AH.01.01.TH.2015                           September 29, 2015.
               tanggal 29 September 2015.

               Berdasarkan akta notaris Catur Virgo, S.H.,                       Based on notarial deed Catur Virgo, S.H.,
               M.H., No. 32 tanggal 27 Mei 2016 telah                            M.H., No. 32 dated May 27, 2016
                                                              - 17 -
Page 21
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

             disetujui perubahan nama dari “PT Waskita                       changed the name of “PT Waskita MNC
             MNC Transjawa Toll Road” menjadi                                Transjawa Toll Road” into “PT Waskita
             “PT Waskita Transjawa Toll Road”. Akta                          Transjawa Toll Road”. The deed was
             tersebut telah disahkan oleh Menteri Hukum                      approved by the Minister of Law and
             dan Hak Asasi Manusia dalam surat                               Human Rights through decision letter
             keputusan No. AHU-AH.01.03-005.3.001                            No. AHU-AH.01.03-005.3.001 dated May
             tanggal 31 Mei 2016.                                            31, 2016.

             Berdasarkan pernyataan keputusan para                           Based on the statement of decisions of
             pemegang saham diluar Rapat Umum                                the         shareholders        outside
             Pemegang Saham Luar Biasa PT Waskita                            the Extraordinary General Meeting of
             Toll Road yang diaktakan melalui Akta                           Shareholders of PT Waskita Toll Road
             Notaris No. 60 tanggal 26 Agustus 2022                          which was notarized through Deed No.
             yang dibuat dihadapan Ir. Nanette Cahyanie                      60 dated August 26, 2022 made before
             Handari Adi Warsito, S.H., Notaris di                           Ir. Nanette Cahyanie Handari Adi
             Jakarta. Bahwa para pemegang saham                              Warsito, S.H., Notary in Jakarta.
             menyetujui     tindakan     WTR      untuk                      Whereas the shareholders agreed to
             melaksanakan Call Option saham RDPT di                          the WTR's action to carry out the Call
             PT WTTR melalui mekanisme pembelian                             Option for RDPT shares in PT WTTR
             unit penyertaan dengan harga sebesar                            through the mechanism of purchasing an
             Rp6.546.570.473.856. Dengan demikian,                           investment    unit  at   a   price    of
             kepemilikan WTR di WTTR meningkat                               Rp6,546,570,473,856.       Accordingly,
             menjadi sebesar 88,08%.                                         WTR’s ownership in WTTR increased to
                                                                             88.08%.

        v.   PT Transjawa TJPJT Jalan Tol (TJPJT)                      v.    PT Transjawa TJPJT Jalan Tol (TJPJT)

             Pendirian    TJPJT    (kepemilikan  tidak                       The establishment of TJPJT (indirect
             langsung melalui WTTR) sesuai dengan                            ownership through WTR) was based on
             Akta Notaris No. 22 tanggal 21 Mei 2007                         Notarial Deed No.22 dated May 21, 2007
             oleh Humberg Lie, S.H., M.Kn., Akta                             by Humberg Lie, S.H, M.Kn., The Deed
             pendirian ini telah mendapat persetujuan                        of established was approved by
             oleh Menteri Hukum dan Hak Asasi                                the Minister of Law and Human Rights
             Manusia melalui Surat Keputusan No. W29-                        through Decision Letter No. W29-
             01201HT.01.01- TH.2007.                                         01201HT.01.01-TH.2007.

             Akuisisi dari TJPJT oleh WTTR sesuai                            Acquisition of TJPJT by WTTR is in
             dengan akta notaris No. 135 tanggal 28                          accordance with the deed No. 135 of
             September 2015 dari notaris Humberg Lie,                        September 28, 2015 of notary Humberg
             S.H., M.Kn., Akta ini telah mendapat                            Lie, S.H., M.Kn., This deed was approved
             persetujuan oleh Menteri Hukum dan Hak                          by The Minister of Law and Human
             Asasi Manusia melalui No. AHU-AH.01.03-                         Rightsthrough its letter No. AHU-
             0969717.                                                        AH.01.03-0969717.

             Perjanjian Pengusahaan Jalan Tol ruas                           The     Concession     Agreements    for
             Pasuruan - Probolinggo telah mengalami                          Pasuruan - Probolinggo Toll Road have
             perubahan, berdasarkan Akta Notaris No. 8                       been amended, by notarial deed No. 8
             tanggal 18 Februari 2020 oleh Rina Utami                        dated February 18, 2020 by Rina Utami
             Djauhari S.H., notaris di Jakarta, terdapat                     Djauhari S.H., notary in Jakarta,
             perubahan masa konsesi atas ruas tol                            the concession period for Pasuruan -
             Pasuruan - Probolinggo menjadi 50 tahun,                        Probolinggo toll road becomes 50 years,
             terakhir berdasarkan Akta Notaris No. 16                        most recent by Notarial Deed No. 16
             tanggal 18 Juni 2021 oleh Rina Utami                            dated June 18, 2021 by Rina Utami
             Djauhari S.H., Notaris di Jakarta. Pada                         Djauhari S.H., Notary in Jakarta. In
             perubahan terakhirnya, masa pembayaran                          the most recent amendment, the principal
             pokok dana pengadaan tanah oleh                                 payment period for land acquisition by
             Perusahaan atas ruas tol Pasuruan -                             the Company for the Pasuruan -
             Probolinggo disesuaikan karena telah                            Probolinggo toll road was adjusted
             melewati Batasan waktu yang ditentukan                          because it passed the time limit
             oleh Perjanjian Pengusahaan Jalan Tol                           determined by the previous Toll Road
             sebelumnya.                                                     Concession Agreement.


                                                           - 18 -
Page 22
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)

              Berdasarkan keputusan para pemegang                               Based on the decision of the
              saham di luar Rapat Umum Pemegang                                 shareholders     outside    the    TJPJT
              Saham Luar Biasa TJPJT yang diaktakan                             Extraordinary    General    Meeting    of
              melalui Akta Notaris No. 04 tanggal 02 Mei                        Shareholders which was notarized
              2024 yang dibuat dihadapan Ir. Nanette                            through Notarial Deed No. 04 dated May
              Cahyanie Handari Adi Warsito, SH, Notaris                         02, 2024 which was made in the
              di Jakarta, bahwa WTTR selaku pemegang                            presence of Ir. Nanette Cahyanie Handari
              saham mayoritas menyetujui rencana                                Adi Warsito, SH, Notary in Jakarta. That
              peningkatan modal dasar dan modal                                 WTTR as the majority shareholder has
              ditempatkan     dan     disetor    sebesar                        approved the plan to increase authorized
              Rp1.512.270.000.000.     Akta ini     telah                       capital and issued and paid-up capital
              mendapat persetujuan oleh Menteri Hukum                           amounting to Rp1,512,270,000,000. This
              dan Hak Asasi Manusia Republik Indonesia                          deed has been approved by the Minister
              melalui surat No. AHU-AH.01.03-0102673                            of Law and Human Rights of the Republic
              tanggal 06 Mei 2024. Atas peningkatan                             of Indonesia through letter No. AHU-
              modal ditempatkan dan disetor tersebut,                           AH.01.03-0102673 dated May 06, 2024.
              maka prosentase kepemilikan WTTR di                               Due to the increase in issued and paid-up
              TJPJT menjadi sebesar 99,99%.                                     capital, the percentage of WTTR
                                                                                ownership in TJPJT will be 99.99%.

        vi.   PT Tol Teluk Balikpapan (TTB)                               vi.   PT Tol Teluk Balikpapan (TTB)

              Pendirian TTB (kepemilikan tidak langsung                         The establishment of TTB (indirect
              melalui WTR) adalah sesuai dengan akta                            ownership through WTR) was based on
              notaris No. 42 tanggal 16 September 2016                          notarial deed No. 42 dated September
              dari notaris Yeti Liana, S.Psi., S.H., M.Kn.,                     16, 2016 of notary Yeti Liana, S. Psi.,
              Akta pendirian ini telah mendapat                                 S.H., M.Kn., The deed of establishment
              persetujuan oleh Menteri Hukum dan Hak                            was approved by the Minister of Law and
              Asasi Manusia melalui surat keputusan                             Human Rights through the decision letter
              tanggal 21 September 2016 No. AHU-                                dated September 21, 2016 No. AHU-
              0041732.AH.01.01.Tahun        2016.    WTR,                       0041732.AH.01.01.Tahun 2016. WTR, a
              entitas anak, memiliki penyertaan sebesar                         subsidiary, holds a 60% interest in TTB
              60%      pada       TTB      atau      setara                     or equivalent to Rp12,000,000,000.
              Rp12.000.000.000.

              Anggaran     Dasar   Perusahaan       telah                       TTB Articles of Association has been
              beberapa kali mengalami perubahan,                                amended several times, most recently by
              terakhir berdasarkan akta notaris No. 27                          the notarial deed No. 27 dated
              tanggal 18 September 2019 dari notaris Ir.                        September 18, 2019 of Ir. Nanette C.H.
              Nanette C.H. Adi Warsito, S.H., yang telah                        Adi Warsito, S.H., which     has     been
              disetujui oleh Menteri Hukum dan Hak                              approved       by the Minister of Law and
              Asasi Manusia dengan Surat Keputusan                              Human Rights through the Decision
              No. AHU-0072820. AH.01.02.Tahun 2019                              LetterNo.         AHU-0072820.AH.01.02
              tanggal 20 September 2019. Perubahan                              Tahun 2019 dated September 20, 2019.
              yang dimaksud antara lain           terkait                       The changes referred to amongothers
              perubahan ketentuan Pasal 3 ayat 2 yakni                          related to changes in the provisions
              terkait maksud dan tujuan serta kegiatan                          of Article 3 paragraph 2 related to
              usaha Perusahaan.                                                 the TTB's purpose and objectives and
                                                                                business activities.

       PT Waskita Beton Precast Tbk (WBP)                                 PT Waskita Beton Precast Tbk (WBP)

       WBP (Entitas Anak) didirikan berdasarkan Akta                      WBP (Subsidiary) was established based on
       No. 10 tanggal 7 Oktober 2014 dari Fathiah                         notarial deed No. 10 dated October 7, 2014 by
       Helmi, S.H., notaris publik di Jakarta dan telah                   Fathiah Helmi, S.H., public notary in Jakarta,
       mendapat pengesahan dari Menteri Hukum dan                         and has been approved by the Minister of
       Hak Asasi Manusia Republik Indonesia melalui                       Law and Human Rights of the Republic of
       surat keputusan No. AHU-29347.40.10.2014                           Indonesia through his decision letter No. AHU-
       tanggal 14 Oktober 2014 serta diumumkan                            29347.40.10.2014 dated October 14, 2014 and
       dalam Berita Negara Republik Indonesia No.                         was published in the State Gazette of
       60221 Tambahan No. 103 tanggal 26 Desember                         the Republic of Indonesia No. 60221
       2014.                                                              Supplement No. 103 dated December 26, 2014.

                                                              - 19 -
Page 23
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)


       Anggaran Dasar WBP telah beberapa kali                         WBP’s Articles of Association had been
       mengalami perubahan, terakhir berdasarkan                      amended several times, most recently based on
       Akta Pernyataan Keputusan Rapat Umum                           the Extraordinary General Meeting’ of
       Pemegang Saham Luar Biasa No. 16 tanggal                       Shareholders’ Deed of Decision No. 16 dated
       10 Agustus 2023 dari Ashoya Ratam S.H.,                        August 10, 2023 by Ashoya Ratam S.H., M.Kn.,
       M.Kn., Akta ini telah mendapat pengesahan dari                 This deed has been approved by the Minister of
       Kementerian Hukum dan Hak Asasi Manusia                        Law and Human Rights of the Republic of
       Republik        Indonesia        dengan surat                  Indonesia based on Decree No. AHU-AH.01.03-
       No.    AHU-AH.01.03-0109371       tanggal   22                 0109371       dated     August     22,   2023.
       Agustus 2023. Amendemen tersebut terkait atas                  The amendment is related to the approval of
       persetujuan konversi utang WBP menjadi                         the conversion of WBP's debt into equity to
       ekuitas kepada kreditur tertentu sesuai dengan                 certain    creditors   in   accordance     with
       ketentuan dalam perjanjian perdamaian;                         the provisions of the peace agreement;
       Persetujuan peningkatan modal dasar dan                        Approval of increasing the authorized and paid-
       disetor WBP tanpa melalui penerbitan seri                      up capital of WBP without pre-emptive rights
       saham baru dalam rangka implementasi atas                      (PMTHMETD) through the issuance of a new
       ketentuan dalam Perjanjian Perdamaian; dan                     series of shares in the context of implementing
       Persetujuan Perubahan Anggaran Dasar WBP,                      the provisions of the Peace Agreement; and
       sehingga kepemilikan Perusahaan berubah                        Approval of changes to WBP's Articles of
       menjadi 29,359%.                                               Association, so that the Company's ownership
                                                                      changes to 29.359%.

       Berdasarkan Akta Pernyataan Keputusan Rapat                    Based on the Deed of Extraordinary General
       Umum Pemegang Saham Luar Biasa No. 60                          Meeting of Shareholders Decision Statement
       tanggal 28 Juli 2023 dan No. 16 tanggal 10                     No. 60 dated July 28, 2023 and No. 16 dated
                                                                      August 10, 2023 from Ashoya Ratam S.H.,
       Agustus 2023 dari Ashoya Ratam S.H., M.Kn.,
                                                                      M.Kn., The Company has 1 series A share
       Perusahaan memiliki 1 lembar saham seri A                      which is owned specifically by the Company
       yang dimiliki khusus oleh Perusahaan yang                      which gives its holder special rights, which
       memberikan     kepada    pemegangnya    hak                    Series B and Series C Shareholders do not
       istimewa, yang tidak dimiliki oleh Pemegang                    have.
       Saham Seri B dan Seri C.

       Hak istimewa tersebut adalah bahwa Rapat                       This privilege is that the General Meeting of
       Umum Pemegang Saham (RUPS) hanya dapat                         Shareholders (GMS) can only be held and make
       dilaksanakan dan mengabil keputusan yang sah                   legal and binding decisions if attended and
                                                                      approved by the Series A Shareholders.
       dan mengikat apabila dihadiri dan disetujui oleh
       Pemegang Saham Seri A.

       Konversi     utang    WBP     menjadi    ekuitas               Conversion as of debt into equity as explained
       sebagaimana dijelaskan di atas, dengan                         above, by issuing new shares without pre-
       menerbitkan saham baru tanpa HMETD dengan                      emptive rights with the following details:
       rincian sebagai berikut:
       1. Total Lembar Saham yang akan diterbitkan:                   1. Total shares to be issued: Rp33,600,099,773
           Rp33.600.099.773 (tiga puluh tiga miliar                      (thirty-three billion six hundred million ninety-
           enam ratus juta sembilan puluh sembilan                       nine thousand seven hundred and seventy-
                                                                         three) ordinary shares.
           ribu tujuh ratus tujuh puluh tiga) saham
           biasa.
       2. Lembar Saham yang telah diterbitkan pada                    2. Shares issued in PMTHMETD Phase I:
           PMTHMETD Tahap I: Rp28.194.563.791                            Rp28,194,563,791 (twenty eight billion one
           (dua puluh delapan miliar seratus sembilan                    ninety four million five hundred sixty three
                                                                         thousand seven hundred ninety one) ordinary
           puluh empat juta lima ratus enam puluh tiga
                                                                         shares.
           ribu tujuh ratus sembilan puluh satu) saham
           biasa.
       3. Saham yang akan diterbitkan pada                            3. Shares to be issued in PMTHMETD Phase II:
           PMTHMETD Tahap II: Rp350.781.751 (tiga                        Rp350,781,751 (three hundred fifty million
           ratus lima puluh juta tujuh ratus delapan                     seven hundred eighty one thousand seven

                                                          - 20 -
Page 24
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

            puluh satu ribu tujuh ratus lima puluh satu)                     hundred fifty one) ordinary shares.
            saham biasa.

       Berdasarkan Surat No. 619/WBP/DIR/2024                          Based on Letter No. 619/WBP/DIR/2024 dated
       tanggal 27 Agustus 2024 perihal Penyampaian                     August 27, 2024 regarding the Submission of
       Keterbukaan Informasi Rencana Penambahan                        Information Disclosure on the Plan to Increase
       Modal Tanpa Hak Memesan Efek Terlebih                           Capital       Without      Pre-emptive        Rights
       Dahulu (PMTHMETD) Tahap II PT Waskita                           (PMTHMETD) Phase II of PT Waskita Beton
       Beton Precast Tbk, bahwa pelaksanaan                            Precast      Tbk,     that    the       PMTHMETD
       PMTHMETD akan dilakukan pada tanggal 3                          implementation will be carried out on September
       September 2024 dengan total konversi sebesar                    3, 2024 with a total conversion of
       Rp    17.823.221.636.   Berdasarkan    Surat                    Rp17,823,221,636. Based on the Statement
       Keterangan dari PT Datindo Entrycom                             Letter from PT Datindo Entrycom No.DE/IX/24-
       No.DE/IX/24-4086      bahwa      kepemilikan                    4086, the Company's ownership has changed to
       Perusahaan berubah menjadi 29,17%. Sampai                       29.17%. As of the reporting date, the deed of
       dengan tanggal pelaporan, akta pengesahan                       validation of the conversion is still in the process
       atas konversi tersebut masih dalam proses                       of being ratified
       pengesahan.

       PT Waskita Karya Realty (WKR)                                   PT Waskita Karya Realty (WKR)

       Pendirian WKR (entitas anak) adalah sesuai                      The establishment of WKR (subsidiary) was
       dengan akta notaris     No.   27    tanggal                     based on notarial deed No. 27 dated October
       16 Oktober 2014 dari notaris Fathiah Helmi,                     16, 2014 of notary Fathiah Helmi, S.H.,
       S.H., Akta pendirian ini telah mendapat                         The deed was approved by the Minister of Law
       persetujuan oleh Menteri Hukum dan Hak                          and Human Rights through the decision letter
       Asasi Manusia melalui surat keputusan                           No. AHU-54929.AH.01.02 dated October 23,
       No. AHU-54929.AH.01.02, tanggal 23 Oktober                      2014.
       2014.

       Anggaran Dasar WKR telah mengalami                              WKR's Articles of Association has been
       beberapa kali perubahan, terakhir dengan akta                   amended for several times, most recently by
       No. 15 tanggal 28 Januari 2019 dari Dewi Tenty                  the notarial deed No. 15 dated on January 28,
       Septi Artiany, S.H., M.H., M.Kn., Notaris di                    2019 of notary Dewi Tenty Septi Artiany, S.H.,
       Jakarta, tentang pernyataan keputusan para                      M.H., M.Kn., on Jakarta about the statement of
       pemegang saham. Akta perubahan ini telah                        shareholders decision. Which has been
       memperoleh      persetujuan    dari    Menteri                  approved by the Minister of Law and Human
       Kehakiman dan Hak Asasi Manusia Republik                        Rights through Decision Letter No. AHU-
       Indonesia dengan Surat Keputusannya No.                         AH.01.03-0067693 dated February 4, 2019.
       AHU-AH.01.03-0067693 tanggal 4 Februari
       2019

       Entitas anak yang berada dibawah WKR                            The subsidiaries under WKR are as follows:
       sebagai berikut:
       i.    PT Waskita Fim Perkasa Realti (WFPR)                       i.      PT Waskita Fim Perkasa Realti (WFPR)
             Pendirian    WFPR      (kepemilikan   tidak                        The establishment of WFPR (indirect
             langsung melalui WKR) adalah sesuai                                ownership through WKR) was based on
             dengan akta notaris No. 122 tanggal 31 Mei                         notarial deed No. 122 dated May 31,
             2018 dari notaris Rosida Rajagukguk                                2018 of notary Rosida Rajagukguk
             Siregar. Akta pendirian ini telah mendapat                         Siregar. The deed of establishment was
             persetujuan oleh Menteri Hukum dan Hak                             approved by the Minister of Law and
             Asasi Manusia melalui surat keputusan                              Human Rights through decision letter
             tanggal 31 Mei 2018 No. AHU-                                       dated May 31, 2018 No. AHU-
             0075663.AH.01.11.Tahun 2018.                                       0075663.AH.01.11.Tahun 2018.
             Anggaran dasar WFPR telah mengalami                                The WFPR’s Articles of Association have
             beberapa kali perubahan, terakhir dengan                           been amended several times, most
             akta No. 223 tanggal 22 September 2022                             recently by Notarial Deed No. 223 dated
             dari Rosida Rajagukguk Siregar, S.H.,                              September     22,    2022   of   Rosida
             M.Kn.,   Notaris   di   Jakarta    tentang                         Rajagukguk Siregar, S.H., M.Kn., public
             pernyataan keputusan sirkuler Rapat Umum                           Notary in Jakarta, regarding the circular

                                                           - 21 -
Page 25
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

             Pemegang Saham. Akta perubahan ini                             decision statement of the General
             telah memperoleh persetujuan dari Menteri                      Meeting      of    Shareholders.     This
             Kehakiman dan Hak Asasi Manusia                                amendment was acknowledged by
             Republik    Indonesia    dengan    Surat                       the Ministry of Law and Human Rights of
             Keputusannya No. AHU-AH.01.09-0058201                          the Republic of Indonesia in its Decision
             tanggal 23 September 2022.                                     Letter No. AHU-AH.01.09-0058201 dated
                                                                            September 23, 2022.
       ii.   PT Waskita Modern Realti (WMR)                           ii.   PT Waskita Modern Realti (WMR)
             Pendirian   WMR      (kepemilikan    tidak                     The establishment of WMR (indirect
             langsung melalui WKR) adalah sesuai                            ownership through WKR) was based on
             dengan akta notaris No. 7 tanggal 17 Mei                       notarial deed No. 7 dated May 17, 2018
             2018 dari notaris Dewi Tenti Septi Artiany                     of notary Dewi Tenti Septi Artiany S.H.,
             S.H., M.H., M.Kn. Akta pendirian ini telah                     M.H., M.Kn. The deed of establishment
             mendapat persetujuan oleh Menteri Hukum                        was approved by the Minister of Law and
             dan Hak Asasi Manusia melalui surat                            Human Rights through the decision letter
             keputusan    tanggal    17    Mei    2018                      dated May 17, 2018 No. AHU-0069024.
             No. AHU-0069024.AH.01.11.Tahun 2018.                           AH.01.11.Tahun 2018.
             Anggaran dasar WMR telah mengalami                             The WMR’s Articles of Association have
             beberapa kali perubahan, terakhir dengan                       been amended several times, most
             akta No. 04 tanggal 19 Januari 2022 dari                       recently by Notarial Deed No. 04 dated
             Nenden Nimatulhayah, S.H., Notaris di                          January     19,    2022    of    Nenden
             Bekasi, tentang Pernyataan Keputusan                           Nirmatulhayah, S.H., public Notary in
             Para Pemegang Saham sebagai Pengganti                          Bekasi, Concerning the Statement of
             Rapat Umum Pemegang Saham. Akta                                Shareholders' Decisions as a Substitute
             perubahan     ini   telah    memperoleh                        for the General Meeting of Shareholders.
             persetujuan dari Menteri Kehakiman dan                         This amendment was acknowledged by
             Hak Asasi Manusia Republik Indonesia                           the Ministry of Law and Human Rights of
             dengan     Surat           Keputusannya                        the Republic of Indonesia in its Decision
             No. AHU-0005656.AH.01.02. tanggal 24                           Letter No. AHU-0005656.AH.01.02 dated
             Januari 2022.                                                  January 24, 2022.
       PT Waskita Karya Infrastruktur (WKI)                           PT Waskita Karya Infrastruktur (WKI)
       Pendirian WKI (entitas anak) adalah sesuai                     The establishment of WKI (subsidiary) was
       dengan akta notaris No. 05 tanggal 4 Maret                     based on notarial deed No. 05 dated March 4,
       2016 dari notaris Fathiah Helmi S.H. Akta                      2016 of notary Fathiah Helmi, S.H. The deed
       pendirian ini telah mendapat persetujuan oleh                  was approved by the Minister of Law and
       Menteri Hukum dan Hak Asasi Manusia melalui                    Human Rights through the decision letter
       surat keputusan No. AHU-0019486. AH.01.01.                     No. AHU-0019486.AH.01.01. dated April 15,
       tanggal 15 April 2016.                                         2016.
       Berdasarkan Akta Notaris No. 109 tanggal 26                    Based on Notarial Deed No. 109 dated February
       Februari 2019 dari Jose Dima Satria, S.H.,                     26, 2019 by Jose Dima Satria, S.H., M.Kn.,
       M.Kn., Notaris di Jakarta Selatan, PT Waskita                  Notary in Jakarta Selatan, PT Waskita Karya
       Karya Energi mengubah nama PT Waskita                          Energi changes the Group’s name to
       Karya Energi menjadi PT Waskita Karya                          PT    Waskita     Karya    Infrastruktur.  This
       Infrastruktur. Akta perubahan ini memperoleh                   amendment deed was approved by the Minister
       persetujuan dari Menteri Hukum dan Hak Asasi                   of Law and Human Rights of the Republic of
       Manusia Republik Indonesia dalam Surat                         Indonesia through the Decision Letter No. AHU-
       Keputusan No. AHU- 0010491.AH.01.02.Tahun                      0010491.AH.01.02.Tahun 2019 dated February
       2019 tanggal 26 Februari 2019.                                 26, 2019.
       Anggaran Dasar WKI telah mengalami                             WKI's Articles of Association has been
       beberapa kali perubahan, terakhir berdasarkan                  amended several times, most recently based on
       Akta Notaris No. 05 tanggal 27 Juni 2023 dari                  Notarial Deed No. 05 dated June 27, 2023 from
       Varinia, S.H, di Jakarta Pusat. Akta perubahan                 Varinia, S.H, in Central Jakarta. This
       ini memperoleh persetujuan dari Menteri Hukum                  amendment deed obtained approval from
       dan Hak Asasi Manusia Republik Indonesia                       the Minister of Law and Human Rights of
       dalam Surat Keputusan No. AHU-0038187.AH.                      the Republic of Indonesia in Decree No. AHU-
       01.02.Tahun 2023 tanggal 6 Juli 2023.                          0038187.AH.01.02.Tahun 2023 July 6, 2023.


                                                          - 22 -
Page 26
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

       Entitas anak yang berada dibawah WKI sebagai                     The subsidiaries under WKI are as follows:
       berikut:
       i.    PT Waskita Sangir Energi (WSE)                              i.    PT Waskita Sangir Energi (WSE)

             Pendirian WSE (kepemilikan tidak langsung                         The establishment of WSE (indirect
             melalui WKI) adalah sesuai dengan akta                            ownership through WKI) was based on
             notaris No. 22 tanggal 11 Juli 2013 dari                          notarial deed No. 22 dated July 11,
             notaris Fathiah Helmi, S.H. Akta pendirian                        2013 of notary Fathiah Helmi, S.H.
             ini telah mendapat persetujuan oleh Menteri                       The deed was approved by the Minister
             Hukum dan Hak Asasi Manusia melalui                               of Law and Human Rights through
             surat keputusan No. AHU-40852.AH.01.01.,                          the    decision  letter   No.    AHU-
             tanggal 26 Juli 2013.                                             40852.AH.01.01. dated July 26, 2013.

             Anggaran dasar WSE telah mengalami                                WSE's Articles of Association have
             beberapa      kali   perubahan,     terakhir                      been amended several times, most
             berdasarkan Akta Notaris No. 15 tanggal                           recently by Notarial Deed No. 15 dated
             21 Desember 2017 dari Kokoh Henry, S.H.,                          December 21, 2017 by Kokoh Henry,
             M.Kn., notaris di Jakarta, dalam rangka                           S.H., M.Kn, notary in Jakarta, regarding
             penambahan modal Perusahaan. Akta                                 additional issuance of capital of
             tersebut diatas telah diberitahukan kepada                        the Company. The above deed was
             Menteri Hukum dan Hak Asasi Manusia dan                           notified to the Minister of Law and
             diterima      berdasarkan       Penerimaan                        Human Rights and was received
             Pemberitahuan No. AHU-AH.01.03-0204677                            pursuant to the Acceptance of
             dan dicatat di dalam Sistem Administrasi                          Information   No.     AHU     AH.01.03-
             Badan Hukum Kementerian Hukum dan                                 0204677 and registered in Legal
             Hak Asasi Manusia Republik        Indonesia                       Entities Administration System of
             melalui Daftar Perseroan No. AHU0164421.                          Minister of Law and Human Rights of
             AH.01.11.Tahun       2017     tanggal    22                       the Republic of Indonesia through
             Desember 2017.                                                    the        Company          Registration
                                                                               No. AHU0164421.AH.01.11. Tahun
                                                                               2017 dated December 22, 2017.
       ii.   PT Waskita Wado Energi (WWE)                                ii.   PT Waskita Wado Energi (WWE)
             PT Waskita Wado Energi didirikan                                  PT Waskita Wado Energi was
             berdasarkan    akta     No.    15    tanggal                      established based on notarial deed No.
             19 Desember 2016 dari Kokoh Henry, S.H.,                          15 dated December 19, 2016 by Kokoh
             M.Kn., notaris di Jakarta. Dengan                                 Henry, S.H., M.Kn., notary in Jakarta.
             kepemilikan saham sebesar 99,95% saham                            With ownership interest of 99.95%
             dan sisanya dimiliki oleh Koperasi Waskita.                       shares and the rest is owned by
             Akta pendirian ini disahkan oleh Menteri                          Koperasi Waskita. The Deed of
             Hukum dan Hak Asasi Manusia Republik                              Establishment was approved by
             Indonesia    dengan      Surat    Keputusan                       the Minister of Law and Human Rights
             No.     AHU-0056418.AH.01.01         tanggal                      of the Republic of Indonesia through
             21 Desember 2016 serta diumumkan dalam                            the Decision Letter No. AHU-
             Berita Negara Republik Indonesia No.                              0056418.AH. 01.01 dated December
             2364/2017 tanggal 7 Februari 2017,                                21, 2016, and was published in State
             Tambahan No. 11.                                                  Gazette of the Republic Indonesia
                                                                               No. 2364/2017 dated February 7, 2017,
                                                                               Supplement No. 11.
             Anggaran Dasar WWE telah beberapa kali                            WWE’s Articles of Association has
             mengalami perubahan, terakhir berdasarkan                         been amended for several times, most
             akta No. 142 tanggal 22 Juli 2019 oleh                            recently by the notarial deed No. 142
             notaris Jose Dima Satria, S.H., M.Kn. yang                        on July 22, 2019 of notary Jose Dima
             telah disetujui oleh Menteri Hukum dan Hak                        Satria S.H., M.Kn., which has been
             Asasi Manusia dengan Surat Keputusan                              approved by the Minister of Law and
             No. AHU-AH.01.03-0306571 tanggal 31 Juli                          Human Rights throught the Decision
             2019, terkait perubahan ketentuan Pasal 3                         Letter No. AHU-AH.01.03-0306571
             yakni terkait maksud dan tujuan serta                             dated July 31, 2019, changes in
             kegiatan usaha Perusahaan.                                        provisions of Article 3 related to
                                                                               the Company’s purpose and objectives
                                                                               and the business activities.
                                                            - 23 -
Page 27
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


       Perusahaan dan entitas anak selanjutnya secara                     The Company and its subsidiaries
       bersama-sama disebut sebagai “Grup”.                               hereinafter will be referred as “the Group”.
       Dekonsolidasi Entitas Anak:                                        Deconsolidation of a Subsidiary:
       PT Trans Jabar Tol (TJT)                                           PT Trans Jabar Tol (TJT)
       Pendirian TJT (kepemilikan tidak langsung                          The establishment of TJT (indirect
       melalui WTR) adalah sesuai dengan akta notaris                     ownership through WTR) was based on
       No. 79 tanggal 19 Juli 2007 dari notaris Humberg                   notarial deed No. 79 dated July 19, 2007 of
       Lie, S.H., M.Kn. Akta pendirian ini telah                          notary Humberg Lie, S.H., M.Kn. This
       mendapat persetujuan oleh Menteri Hukum dan                        notarial deed has been approved by
       Hak Asasi Manusia melalui surat keputusan No.                      the Minister of Law and Human Rights
       W29-01398-HT.01.01- TH.2007.                                       through the decision letter No. W29-01398-
                                                                          HT.01.01-TH.2007.
       Akuisisi TJT oleh WTR sesuai dengan akta                           Acquisition of TJT by WTR was in
       notaris Jose Dima Satria, S.H., M.Kn No. 44                        accordance with the deed of notary Jose
       tanggal 22 Desember 2015. Akta ini telah                           Dima Satria, S.H., M.Kn No. 44 dated
       mendapat persetujuan oleh Menteri Hukum dan                        December 22, 2015. This deed was
       Hak Asasi      Manusia      melalui    surat                       approved by the Minister of Law and Human
       No. AHU-AH.01.03-0990894.                                          Rights through the decision letter No. AHU-
                                                                          AH.01.03-0990894.
       Anggaran Dasar TJT telah beberapa kali                             TJT's Articles of Association has been
       mengalami perubahan, terakhir berdasarkan                          amended several times, most recently based
       keputusan sirkuler para pemegang saham                             on the circular decision of the shareholders
       sebagai pengganti dari Rapat Umum Pemegang                         in lieu of the Extraordinary General Meeting
       Saham Luar Biasa TJT yang diaktakan melalui                        of Shareholders of TJT which was notarized
       Akta Notaris No. 36 tanggal 30 Agustus 2024                        through Notarial Deed No. 36 dated August
       yang dibuat dihadapan Indah Khaerunnisa, S.H.,                     30, 2024 which was made in the presence of
       M.Kn., Notaris di Jakarta. Bahwa WTR selaku                        Indah Khaerunnisa, SH., M.Kn, Notary in
       pemegang      saham     mayoritas  menyetujui                      Jakarta. That WTR as the majority
       peningkatan modal ditempatkan dan disetor                          shareholder has approved the increase
       sebesar Rp997.484.000.00. Akta ini telah                           issued and paid-up capital amounting to
       mendapat persetujuan oleh Menteri Hukum dan                        Rp997,484,000,000. This deed has been
       Hak Asasi Manusia Republik Indonesia melalui                       approved by the Minister of Law and Human
       surat No. AHU-AH.01.03-0190194 tanggal 6                           Rights of the Republic of Indonesia through
       September 2024.                                                    letter No. AHU-AH.01.03-0190194 dated
                                                                          September 6, 2024.

       Berdasarkan Akta Jual Beli Nomor 26 tanggal 25                     Based on the Sale and Purchase Deed
       Januari 2024 antara WTR dengan SMI telah                           Number 26 dated January 25, 2024,
       terjadi transaksi jual beli kepemilikan saham WTR                  between WTR and SMI, there has been a
       di TJT kepada SMI. WTR menjual dan                                 sale and purchase transaction of WTR share
       menyerahkan kepada SMI kepemilikan saham di                        ownership in TJT to SMI. WTR sold and
       TJT        dengan       harga      total    sebesar                handed over to SMI its share ownership in
       Rp755.330.988.463 atau sebesar 1.235.922                           TJT for a total price of Rp755,330,988,463
       lembar saham. Berdasarkan transaksi tersebut                       or 1,235,922 shares. Based on this
       SMI menjadi salah satu pemegang saham di TJT                       transaction, SMI became a shareholder in
       dengan prosentase sebesar 25%, sedangkan                           TJT with a percentage of 25%, while WTR's
       kepemilikan WTR di TJT menjadi 74,99% dan                          ownership in TJT became 74.99% and
       sisanya sebesar 0,01% dimiliki oleh Koperasi                       the remaining 0.01% was owned by
       Waskita.                                                           the Koperasi Waskita.
       Berdasarkan Berita Acara Pemenuhan dan/atau                        Based on the Minutes of Fulfillment and/or
       Pengesampingan Persyaratan Pendahuluan yang                        Waiver of Preliminary Requirements which
       telah ditandatangani kedua belah pihak antara                      were signed by both parties between WTR
       WTR dengan SMI tanggal 24 Januari 2024,                            and SMI on January 24 2024, Part III:
       Bagian III: Persyaratan Pendahuluan Para Pihak                     Preliminary Requirements of the Parties
       Poin 1.(ii) bahwa setelah terjadinya transaksi                     Point 1.(ii) that after the transaction between
       antara WTR dan SMI maka dalam menjalankan                          WTR and SMI occurs, in carrying out
       operasional TJT dilakukan dengan ketentuan                         operations TJT is carried out under the
       Joint Control (Pengendalian Bersama).                              provisions of Joint Control.
                                                             - 24 -
Page 28
PT WASKITA KARYA (PERSERO) Tbk                                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                       (Expressed in Rupiah, unless otherwise stated)


2.   PENERAPAN     PERNYATAAN    STANDAR                                      2.     ADOPTION
                                                                                       2          OF NEW    AND   REVISED
     AKUNTANSI KEUANGAN BARU DAN REVISI                                              STATEMENTS OF FINANCIAL ACCOUNTING
     (PSAK)  DAN    INTERPRETASI STANDAR                                             STANDARDS (PSAK) AND INTERPRETATIONS
     AKUNTANSI KEUANGAN (ISAK)                                                       OF PSAK (ISAK)

     Berikut ini merupakan perubahan nomenklatur                                     The following are nomenclature changed to
     standar yang berlaku efektif pada 1 Januari 2024,                               standards which effective for periods January 1,
     yaitu:                                                                          2024, are as follows:
  Nomor PSAK dan ISAK Sebelum/   Nomor PSAK dan ISAK Sesudah/                                                Judul/
 PSAK and ISAK Numbers Before     Nama Proyek/ Project Name                                                  Title
            PSAK 1                        PSAK 201              Penyajian Laporan Keuangan/ Presentation of Financial Statement
            PSAK 2                        PSAK 207              Laporan Arus Kas/ Statement of Cash Flow
            PSAK 3                        PSAK 234              Laporan Keuangan Interim/ Interim Financial Reporting
            PSAK 4                        PSAK 227              Laporan Keuangan Tersendiri/ Separate Financial Statements
            PSAK 5                        PSAK 108              Segmen Operasi/ Operating Segment
            PSAK 7                        PSAK 224              Pengungkapan Pihak-Pihak Berelasi/ Related-party Disclosure
           PSAK 8                         PSAK 210              Peristiwa Setelah Periode Pelaporan/ Events after the Reporting Period
           PSAK 10                        PSAK 221              Pengaruh Perubahan Kurs Valuta Asing/ The Effects of Changes in Foreign Exchange Rate
           PSAK 13                        PSAK 240              Properti Investasi/ Property Investment
           PSAK 14                        PSAK 202              Persediaan/ Inventories
           PSAK 15                        PSAK 228              Investasi pada Entitas Asosiasi dan Ventura Bersama/ Investments in Associates and Joint
                                                                Ventures
           PSAK 16                        PSAK 216              Aset Tetap/ Property Plant and Equipment
           PSAK 19                        PSAK 238              Aset Tak Berwujud/ Intangible Assets
           PSAK 22                        PSAK 103              Kombinasi Bisnis/ Business Combinations
           PSAK 24                        PSAK 219              Imbalan Kerja/ Employee Benefits
           PSAK 25                        PSAK 208              Kebijakan Akuntansi, Perubahan Estimasi Akuntansi, dan Kesalahan/ Accounting Policies, Changes
                                                                in Accounting Estimates and Errors
           PSAK 26                        PSAK 223              Biaya Pinjaman/ Borrowing Costs
           PSAK 28                        PSAK 328              Akuntansi Kontrak Asuransi Kerugian/ Accounting for Loss Insurance Contract
           PSAK 38                        PSAK 338              Kombinasi Bisnis Entitas Sepengendali/ Business Combination of Entities Under Common Contro
           PSAK 46                        PSAK 212              Pajak Penghasilan/ Income Taxes
           PSAK 48                        PSAK 236              Penurunan Nilai Aset/ Impairment of Assets
           PSAK 50                        PSAK 232              Instrumen Keuangan: Penyajian/ Financial Instruments: Presentation
           PSAK 53                        PSAK 102              Pembayaran Berbasis Saham/ Share-based Payment
           PSAK 55                        PSAK 239              Instrumen Keuangan: Pengakuan dan Pengukuran/ Financial Instruments: Recognition and
                                                                Measurement
           PSAK 56                        PSAK 233              Laba per Saham/ Earning per Share
           PSAK 57                        PSAK 237              Provisi, Liabilitas Kontinjensi, dan Aset Kontinjensi/ Provisions, Contigent Liabilities and Contigent
                                                                Assets
           PSAK 58                        PSAK 105              Aset Tidak Lancar yang Dikuasai untuk Dijual dan Operasi yang Dihentikan/ Non-current Assets Held
                                                                for Sale and Discontinued Operations
           PSAK 60                        PSAK 107              Instrumen Keuangan: Pengungkapan/ Financial Instruments: Disclosures
           PSAK 65                        PSAK 110              Laporan Keuangan Konsolidasian/ Consolidated Financial Statements
           PSAK 66                        PSAK 111              Pengaturan Bersama/ Joint Arrangements
           PSAK 67                        PSAK 112              Pengungkapan Kepentingan dalam Entitas Lain/ Disclosure of Intersests in Other Entities
           PSAK 68                        PSAK 113              Pengukuran Nilai Wajar/ Fair Value Measurement
           PSAK 70                        PSAK 370              Akuntansi Aset dan Liabilitas Pengampunan Pajak/ Accounting for Tax Amnesty Assets and
                                                                Liabilities
           PSAK 71                        PSAK 109              Instrumen Keuangan/ Financial Instruments
           PSAK 72                        PSAK 115              Pendapatan dari Kontrak dengan Pelanggan/ Revenue from Contracts with Customers
           PSAK 73                        PSAK 116              Sewa/ Leases
           PSAK 74                        PSAK 117              Kontrak Asuransi/ Insurance Contract
           PSAK 110                       PSAK 410              Akuntansi Sukuk/ Accounting for Sukuk
            ISAK 13                        SAK 116              Lindung Nilai Investasi Neto dalam Kegiatan Usaha Luar Negeri/ Hedges of a Net Investment in a
                                                                Foreign Operation
            ISAK 16                        ISAK 112             Perjanjian Konsesi Jasa/ Service Concession Arrangements
            ISAK 17                        ISAK 110             Laporan Keuangan Interim dan Penurunan Nilai/ Interim Financial Reporting and Impairment
            ISAK 20                        ISAK 225             Pajak Penghasilan – Perubahan dalam Status Pajak Entitas atau Para Pemegang Sahamnya/
                                                                Income Taxes: Changes in the Tax Status of an Entity or Its Shareholders
            ISAK 22                        ISAK 229             Perjanjian Konsesi Jasa: Pengungkapan/ Service Concession Arrangements: Disclosure
            ISAK 28                        ISAK 119             Pengakhiran Liabilitas Keuangan dengan Instrumen Ekuitas/ Extinguishing Financial Liabilities with
                                                                Equity Instruments
            ISAK 31                        ISAK 331             Interpretasi atas Ruang Lingkup PSAK 240: Properti Investasi/ Interpretation of the Scope of PSAK
                                                                13: Investment Property
            ISAK 32                        ISAK 332             Definisi dan Hierarki Standar Akuntansi Keuangan/ Definition and Hierarchy of Financial Accounting
                                                                Standards
            ISAK 33                        ISAK 122             Transaksi Valuta Asing dan Imbalan di Muka/ Foreign Currency Transactions and Advance
                                                                Consideration
            ISAK 34                        ISAK 123             Ketidakpastian dalam Perlakuan Pajak Penghasilan/ Uncertainty Over Income Tax Treatments




                                                                         - 25 -
Page 29
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

   Perubahan atas Pernyataan Standar Akuntansi                        Changes to the Statements               of   Financial
   Keuangan (PSAK)                                                    Accounting Standards (PSAK)

   Amendemen dan revisi atas standar yang berlaku                     Amendment and revised to standards which
   efektif untuk periode yang dimulai pada atau setelah               effective for periods beginning on or after January 1,
   1    Januari 2024,       dengan    penerapan dini                  2024, with early adoption is permitted, are as
   diperkenankan yaitu:                                               follows:

   •    Amendemen PSAK 201: Penyajian Laporan                         •    Amendments PSAK 201: Presentation of
        Keuangan tentang Liabilitas Jangka Panjang                         Financial Statements related to Non-Current
        Dengan Kovenan;                                                    Liabilities with Covenants;
   •    Amendemen PSAK 116: Liabilitas Sewa dalam                     •    Amendments PSAK 116: Lease Liability in a
        Jual dan Sewa – Balik;                                             Sale and Leaseback;
   •    Amendemen PSAK 207: Laporan Arus Kas dan                      •    Amendments PSAK 207: Statement of Cash
        PSAK       107:      Instrumen    Keuangan:                        Flows and PSAK 107: Financial Instrument:
        Pengungkapan          tentang    Pengaturan                        Disclosure       regarding  Supplier Finance
        Pembiayaan Pemasok;                                                Agreement;
   •    Revisi PSAK 401: Penyajian Laporan Keuangan                   •    Revised PSAK 401: Presentation of Shariah
        Syariah; dan                                                       Financial Statements; and
   •    Revisi PSAK 409: Akuntansi Zakat, Infak, dan                  •    Revised PSAK 409: Accounting of Zakah, Infaq,
        Sedekah                                                            and Sadaqah
   Efektif untuk periode yang dimulai pada atau setelah               Effective for periods beginning on or after January 1,
   tanggal 1 Januari 2025                                             2025
   •    PSAK 74 (amendemen) Kontrak Asuransi.                         •    PSAK 74 (amendment) Insurance Contract.
   Penerapan atas PSAK baru atau revisi tidak                         The adoption of new or revised PSAK does not
   menggambarkan        perubahan   atas  kebijakan                   represent a change to the Group's accounting
   akuntansi Grup dan tidak memiliki dampak material                  policies and does not have a material impact on the
   terhadap jumlah yang dilaporkan pada periode                       amounts reported in the current period or previous
   berjalan atau tahun sebelumnya.                                    year.

3. INFORMASI
      2      KEBIJAKAN AKUNTANSI MATERIAL                        3.   MATERIAL            ACCOUNTING               POLICIES
                                                                      INFORMATION
   a.   Pernyataan kepatuhan                                          a.   Statement of compliance
        Laporan keuangan konsolidasian Grup disusun                        The consolidated financial statements of
        sesuai dengan Standar Akuntansi Keuangan di                        the Group has been prepared in accordance
        Indonesia yang mencakup Pernyataan Standar                         with Indonesian Financial Accounting Standards
        Akuntansi Keuangan (PSAK) dan Interpretasi                         which include Statements of Financial
        Standar Akuntansi Keuangan (ISAK) yang                             Accounting        Standards     (PSAK)       and
        diterbitkan oleh Dewan Standar Akuntansi                           Interpretation of Financial Accounting Standards
        Keuangan - Ikatan Akuntan Indonesia (DSAK -                        (ISAK) issued by the Financial Accounting
        IAI) dan Dewan Standar Akuntansi Syariah -                         Standard Board - Indonesian Institute of
        Ikatan Akuntan Indonesia (DSAS - IAI), serta                       Accountant (DSAK - IAI) and Islamic Accounting
        Peraturan Otoritas Jasa Keuangan (OJK)                             Standard Board - Indonesian Institute of
        No.     VIII.G.7 mengenai   Penyajian   dan                        Accountant (DSAS - IAI), and Regulations of
        Pengungkapan Laporan Keuangan Emiten atau                          Financial Services Authority (OJK) No. VIII.G.7
        Perusahaan Publik.                                                 regarding the Presentations and Disclosures of
                                                                           the Financial Statements of Listed Entities.

   b.   Dasar Pengukuran dan Penyusunan Laporan                       b. The Basis of Measurement and Preparation
        Keuangan Konsolidasian                                           of Consolidated Financial Statements

        Dasar pengukuran dalam penyusunan laporan                          The basic measurement in the preparation of
        keuangan konsolidasian interim adalah konsep                       these interim consolidated financial statements
        biaya perolehan (historical cost), kecuali untuk                   is the historical cost method, except for
        akun aset tetap yang telah dinilai kembali                         the revaluation of fixed assets in year 2023,
        (revaluasi) di tahun 2023, investasi dalam efek                    investments in shares of stock which are carried
        tertentu yang dicatat sebesar nilai wajarnya atau                  at its fair value or accounted for under the equity
        dicatat    menggunakan       metode       ekuitas,                 method, and inventories which are carried at
        persediaan yang dinyatakan sebesar nilai yang                      the lower of cost and net realizable value.

                                                             - 26 -
Page 30
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

        lebih rendah antara harga perolehan dan nilai                    The consolidated financial statements are
        realisasi bersih (the lower of cost or net                       prepared based on going concern using
        realizable    value).   Laporan    keuangan                      the accrual method, except for the consolidated
        konsolidasian disusun berdasarkan asumsi                         statements of cash flows.
        kelangsungan usaha serta menggunakan
        metode akrual kecuali untuk laporan arus kas
        konsolidasian.

        Laporan arus kas konsolidasian disusun dengan                    The consolidated statements of cash flows are
        menggunakan metode langsung (direct method)                      prepared using the direct method by classifying
        dengan mengelompokkan arus kas ke dalam                          cash flows into operating, investing and
        aktivitas operasi, investasi dan pendanaan.                      financing activities.

        Mata uang penyajian yang digunakan dalam                         The      presentation    currency     used     in
        penyusunan laporan keuangan konsolidasian ini                    the preparation of the consolidated financial
        adalah Rupiah (Rp) yang merupakan mata uang                      statements is Indonesian Rupiah (Rp) which is
        fungsional Grup. Setiap entitas di dalam Grup                    the functional currency of the Group. Each entity
        menetapkan mata uang fungsional sendiri dan                      in the Group determines its own functional
        unsur-unsur    dalam     laporan     keuangan                    currency and items included in the consolidated
        konsolidasian dari setiap entitas diukur                         financial statements of each entity are
        berdasarkan mata uang fungsional tersebut.                       measured using that functional currency.

   c.   Prinsip-prinsip Konsolidasian                               c.   Principles of Consolidation
        Laporan keuangan konsolidasian mencakup                          The     consolidated  financial    statements
        laporan keuangan Perusahaan dan entitas-                         incorporate the financial statements of
        entitas anak seperti disebutkan pada Catatan                     the Company and its subsidiaries as described
        1.b.                                                             in Note 1.b.

        Entitas anak adalah entitas yang dikendalikan                    A subsidiary is an entity controlled by the Group,
        oleh Grup, yakni Grup terekspos, atau memiliki                   i.e. the Group is exposed, or has rights, to
        hak,     atas  imbal   hasil   variabel   dari                   variable returns from its involvement with
        keterlibatannya dengan entitas dan memiliki                      the entity and has the ability to affect those
        kemampuan untuk mempengaruhi imbal hasil                         returns through its current ability to direct
        tersebut melalui kemampuan kini untuk                            the entity’s relevant activities (power over
        mengarahkan aktivitas relevan dari entitas                       the investee).
        (kekuasaan atas investee).

        Keberadaan dan dampak dari hak suara                             The existence and effect of substantive potential
        potensial dimana Grup memiliki kemampuan                         voting rights where the Group has the practical
        praktis untuk melaksanakan (yakni hak                            ability to execute (i.e. substantive rights) are
        substantif) dipertimbangkan saat menilai apakah                  considered when assessing whether the Group
        Grup mengendalikan entitas lain.                                 controls another entity.

        Laporan      keuangan    konsolidasian    Grup                   The Group’s consolidated financial statements
        mencakup hasil usaha, arus kas, aset dan                         incorporate the results, cash flows, assets and
        liabilitas dari Perusahaan dan seluruh entitas                   liabilities of the Company and all of its
        anak yang secara langsung dan tidak langsung                     subsidiaries are directly and indirectly controll.
        dikendalikan oleh Perusahaan. Entitas anak                       Subsidiaries are consolidated from the effective
        dikonsolidasikan sejak tanggal efektif akuisisi,                 date of acquisition, which is the date on which
        yaitu tanggal dimana Grup secara efektif                         the Group effectively obtains control of
        memperoleh pengendalian atas bisnis yang                         the acquired business, until that control is lost.
        diakuisisi,     sampai   tanggal    kehilangan
        pengendalian.

        Entitas induk menyusun laporan keuangan                          A parent prepares consolidated financial
        konsolidasian dengan menggunakan kebijakan                       statements using uniform accounting policies for
        akuntansi yang sama untuk transaksi dan                          transactions and other events in similar
        peristiwa lain dalam keadaan yang serupa.                        circumstances. All intragroup transactions,
        Seluruh transaksi, saldo, penghasilan, beban,                    balances, income, expenses and cash flows
        dan arus kas dalam intra kelompok usaha                          relating to transaction between entities of
        terkait dengan transaksi antar entitas dalam                     the group are fully eliminated.
        grup dieliminasi secara penuh.
                                                           - 27 -
Page 31
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


        Grup mengatribusikan laba rugi dan setiap                        The Group attributes the profit and loss and
        komponen dari penghasilan komprehensif lain                      each component of other comprehensive
        kepada pemilik entitas induk dan kepentingan                     income to the owners of the parent and
        non-pengendali       meskipun       hal tersebut                 noncontrolling interest even though this results
        mengakibatkan kepentingan non-pengendali                         in the non-controlling interests having a deficit
        memiliki saldo defisit. Grup menyajikan                          balance. The Group presents non-controlling
        kepentingan non-pengendali di ekuitas dalam                      interest in equity in the consolidated statement
        laporan posisi keuangan konsolidasian, terpisah                  of financial position, separately from the equity
        dari ekuitas pemilik entitas induk.                              owners of the parent.

        Perubahan dalam bagian kepemilikan entitas                       Changes in the parent’s ownership interest in a
        induk pada entitas anak yang tidak                               subsidiary that do not result in loss of control are
        mengakibatkan hilangnya pengendalian adalah                      equity transactions (i.e. transactions with
        transaksi ekuitas (yaitu transaksi dengan pemilik                owners in their capacity as owners). When
        dalam kapasitasnya sebagai pemilik). Ketika                      the proportion of equity held by non-controlling
        proporsi ekuitas yang dimiliki oleh kepentingan                  interest change, the Group adjusts the carrying
        non-pengendali berubah, Grup menyesuaikan                        amounts of the controlling interest and non-
        jumlah tercatat kepentingan pengendali dan                       controlling interest to reflect the changes in their
        kepentingan         non-pengendali         untuk                 relative interest in the subsidiaries. Any
        mencerminkan         perubahan        kepemilikan                difference between the amount by which
        relatifnya dalam entitas anak. Selisih antara                    the non-controlling interests are adjusted and
        jumlah dimana kepentingan non-pengendali                         the fair value of the consideration paid or
        disesuaikan dan nilai wajar dari jumlah yang                     received is recognized directly in equity and
        diterima atau dibayarkan diakui langsung dalam                   attributed to the owners of the parent.
        ekuitas dan diatribusikan pada pemilik dari
        entitas induk.

        Jika Grup kehilangan pengendalian, maka Grup:                    If the Group loses control, the Group:
        •   Menghentikan pengakuan aset (termasuk                        •   Derecognizes     the      assets    (including
            goodwill) dan liabilitas entitas anak pada                       goodwill) and liabilities of the subsidiary at
            jumlah tercatatnya ketika pengendalian                           their carrying amounts at the date when
            hilang;                                                          control is lost;
        •   Menghentikan pengakuan jumlah tercatat                       •   Derecognizes the carrying amount of any
            setiap kepentingan non-pengendali pada                           non-controlling interests in the former
            entitas anak terdahulu ketika pengendalian                       subsidiary at the date when control is lost
            hilang     (termasuk     setiap    komponen                      (including any components of other
            penghasilan komprehensif lain yang                               comprehensive income attributable to
            diatribusikan pada kepentingan non-                              them);
            pengendali)
        •   Mengakui nilai wajar pembayaran yang                         •   Recognizes        the      fair    value  of
            diterima (jika ada) dari transaksi, peristiwa,                   the consideration received, (if any) from
            atau     keadaan     yang      mengakibatkan                     the transaction, event or circumstances that
            hilangnya pengendalian;                                          resulted in the loss of control;
        •   Mengakui sisa investasi pada entitas anak                    •   Recognizes any investment retained in
            terdahulu pada nilai wajarnya pada tanggal                       the former subsidiary at fair value at the
            hilangnya pengendalian;                                          date when control is lost;
        •   Mereklasifikasi    ke    laba    rugi,   atau                •   Reclassifies to profit or loss, or transfer
            mengalihkan secara langsung ke saldo laba                        directly to retained earnings if required by
            jika disyaratkan oleh SAK lain, jumlah yang                      other PSAKs, the amount recognized in
            diakui dalam penghasilan komprehensif lain                       other comprehensive income in relation to
            dalam kaitan dengan entitas anak; dan                            the subsidiary; and
        •   Mengakui       perbedaan      apapun     yang                •   Recognizes any resulting difference as a
            dihasilkan sebagai keuntungan atau                               gain or loss attributable to the parent.
            kerugian dalam laba rugi yang diatribusikan
            kepada entitas induk.
   d.   Kombinasi bisnis                                              d. Business combinations
        Kombinasi bisnis adalah suatu transaksi atau                     Business combination is a transaction or other
        peristiwa lain dimana pihak pengakuisisi                         events in which an acquirer obtains control of
        memperoleh pengendalian atas satu atau lebih                     one or more businesses. Business combination

                                                             - 28 -
Page 32
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

       bisnis. Kombinasi bisnis dicatat dengan                          is accounted for by applying the acquisition
       menggunakan metode akuisisi. Imbalan yang                        method. The consideration transferred in a
       dialihkan dalam suatu kombinasi bisnis diukur                    business combination is measured at fair value,
       pada nilai wajar, yang dihitung sebagai hasil                    which is computed as the sum of the fair value
       penjumlahan dari nilai wajar seluruh aset yang                   of the assets transferred by the Group at
       dialihkan oleh Grup pada tanggal akuisisi,                       acquisition date, liabilities recognized by
       liabilitas yang diakui oleh Grup kepada pemilik                  the Group to former owners of the acquiree, and
       sebelumnya dari pihak yang diakuisisi, dan                       the equity interests issued by the Group in
       kepentingan ekuitas yang diterbitkan oleh Grup                   exchange for control of the acquiree.
       dalam pertukaran pengendalian dari pihak yang                    Acquisition-related costs are recognized as
       diakuisisi. Biaya-biaya terkait akuisisi diakui                  expenses in the period in which the costs are
       sebagai beban pada periode saat biaya tersebut                   incurred and the services are rendered.
       terjadi dan jasa diterima.

       Pada tanggal akuisisi, aset teridentifikasi yang                 At the acquisition date, the identifiable assets
       diperoleh dan liabilitas yang diambil alih diakui                acquired and the liabilities assumed are
       pada nilai wajar kecuali untuk aset dan liabilitas               recognized at the fair value except for certain
       tertentu yang diukur sesuai dengan SAK yang                      assets and liabilities that are measured in
       relevan.                                                         accordance with the relevant SAK.

       Komponen kepentingan non-pengendali pada                         Components of non-controlling interests of
       pihak yang diakuisisi diukur baik pada nilai                     the acquiree are measured either at fair value or
       wajar ataupun pada bagian proporsional                           according to proportional share of the equity
       instrumen kepemilikan yang ada dalam jumlah                      instruments in the recognized amounts of
       yang diakui atas aset neto teridentifikasi dari                  the acquiree’s identifiable net assets.
       pihak diakuisisi

       Bila suatu kombinasi bisnis dilakukan secara                     When a business combination is achieved in
       bertahap, kepemilikan terdahulu Grup atas                        stages, the Group’s previously held equity
       pihak terakuisisi diukur kembali ke nilai wajar                  interest in the acquiree is remeasured at its fair
       pada tanggal akuisisi dan keuntungan atau                        value at the acquisition date and the resulting
       kerugiannya, jika ada, diakui dalam laba rugi.                   gain or loss, if there is any, is recognized in
       Apabila dalam periode sebelumnya, perubahan                      profit or loss. If in prior periods, changes in fair
       nilai wajar yang berasal dari kepentingan                        value of its equity interest in the acquiree prior
       ekuitasnya sebelum tanggal akuisisi telah diakui                 to the acquisition date had been recognized in
       dalam penghasilan komprehensif lain, jumlah                      other comprehensive income, that amount shall
       tersebut diakui dengan dasar yang sama                           be recognized with the same basis as would be
       sebagaimana dipersyaratkan jika Grup telah                       required had the Group disposed of
       melepas secara langsung kepentingan ekuitas                      the previously held equity interest directly.
       yang dimiliki sebelumnya

       Jika akuntansi awal untuk kombinasi bisnis                       If the initial accounting for a business
       belum selesai pada akhir periode pelaporan                       combination is incomplete by the end of
       saat kombinasi terjadi, Grup melaporkan jumlah                   the reporting period in which the combination
       sementara untuk pos-pos yang proses                              occurs, the Group reports provisional amounts
       akuntansinya belum selesai dalam laporan                         for the items for which the accounting is
       keuangannya. Selama periode pengukuran,                          incomplete. During the measurement period,
       Grup menyesuaikan secara retrospektif jumlah                      the Group shall retrospectively adjust those
       sementara tersebut, dan mengakui tambahan                        provisional amounts and recognize additional
       aset atau liabilitas, untuk mencerminkan                         assets or liabilities, to reflect new information
       informasi baru yang diperoleh tentang fakta dan                  obtained about facts and circumstances that
       keadaan yang ada pada tanggal akuisisi, yang                     existed as of the acquisition date that, if known,
       jika diketahui, akan menyebabkan pengakuan                       would have resulted in the recognition of those
       aset dan liabilitas yang dimaksud pada tanggal                   assets and liabilities as of that date.
       tersebut

       Pada tanggal akuisisi, Grup mengakui goodwill                    At acquisition date, the Group recognizes
       yang diukur sebagai selisih lebih antara (a) nilai               goodwill which is measured as the excess of (a)
       gabungan dari imbalan yang dialihkan, jumlah                     the aggregate of the consideration transferred,
       setiap kepentingan non-pengendali, dan jika                      the amount of any non-controlling interest, and
       kombinasi bisnis dilakukan secara bertahap,                      in a business combination achieved in stages,
       nilai wajar pada tanggal akuisisi kepentingan                    the acquisition-date fair value of the Group’s

                                                            - 29 -
Page 33
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

       ekuitas yang sebelumnya dimiliki Grup atas                        previously held equity interest in the acquiree;
       pihak yang diakuisisi; dan (b) selisih jumlah dari                and (b) the net of the acquisition-date amounts
       aset teridentifikasi yang diperoleh dan liabilitas                of the identifiable assets acquired and liabilities
       yang diambil alih pada tanggal akuisisi. Jika                     assumed. If this consideration is lower than
       imbalan tersebut kurang dari nilai wajar aset                     the fair value of the net assets of the acquiree,
       neto pihak yang diakuisisi, selisih tersebut                      the difference is recognized in profit or loss as
       diakui dalam laporan laba rugi sebagai                            gain on bargain purchase after previously
       keuntungan dari akuisisi setelah sebelumnya                       the management reassesses whether it has
       manajemen menilai kembali apakah telah                            correctly identified all of the assets acquired and
       mengidentifikasi dengan tepat seluruh aset yang                   all of the liabilities assumed and recognize any
       diperoleh dan liabilitas yang diambil alih serta                  additional assets or liabilities that are identified
       mengakui setiap aset atau liabilitas tambahan                     in that review.
       yang dapat diidentifikasi dalam penelaahan
       tersebut.

       Setelah pengakuan awal, goodwill diukur pada                      Subsequent to initial recognition, goodwill is
       jumlah tercatat dikurangi akumulasi kerugian                      measured at cost less any accumulated
       penurunan nilai. Untuk tujuan pengujian                           impairment losses. For the purposes of
       penurunan nilai, goodwill yang diperoleh dari                     impairment testing, goodwill acquired in a
       suatu kombinasi bisnis, sejak tanggal akuisisi,                   business combination, from the acquisition date,
       dialokasikan kepada setiap Unit Penghasil Kas                     is allocated to each of the Group’s Cash
       dari Grup yang diperkirakan akan memberikan                       Generating Units that is expected to benefit from
       manfaat dari sinergi kombinasi bisnis tersebut,                   the synergies of business combinations,
       terlepas dari apakah aset atau liabilitas lain dari               regardless of whether other assets or liabilities
       pihak yang diakuisisi ditempatkan dalam Unit                      of the acquiree are assigned to those Cash
       Penghasil Kas tersebut.                                           Generating Units.

       Jika goodwill telah dialokasikan pada suatu Unit                  If goodwill was allocated to a Cash Generating
       Penghasil Kas dan operasi tertentu atas Unit                      Unit and certain operations on the Cash
       Penghasil Kas tersebut dilepaskan, maka                           Generating Unit are disposed, the goodwill
       goodwill yang terkait dengan operasi yang                         associated with the disposed operation is
       dilepaskan tersebut termasuk dalam jumlah                         included in the carrying amount of the operation
       tercatat operasi tersebut ketika menentukan                       when determining the gain or losses on
       keuntungan atau kerugian dari pelepasan.                          disposal. The disposed goodwill is measured on
       Goodwill yang dilepaskan tersebut diukur                          the basis of relative values of the disposed
       berdasarkan nilai relatif operasi yang dihentikan                 operation and the portion of the Cash
       dan porsi Unit Penghasil Kas yang ditahan                         Generating Units retained.

       Goodwill awalnya diukur pada harga perolehan,                     Goodwill is initially measured at historical cost,
       yang merupakan selisih lebih dari nilai agregat                   the excess of the aggregate of the consideration
       imbalan yang dialihkan dan nilai yang diakui                      transferred and the amount recognized for non-
       oleh kepentingan non-pengendali dan nilai                         controlling interests, and any previous interest
       kepentingan ekuitas yang dimiliki sebelumnya,                     held, over the net identifiable assets acquired
       atas jumlah neto dari aset teridentifikasi yang                   and liabilities assumed. If the fair value of net
       diperoleh dan liabilitas yang diambil alih. Jika                  assets acquired is in excess of the aggregate
       nilai wajar dari jumlah neto aset yang diakuisisi                 consideration transferred, the Group reassesses
       melebihi nilai agregat imbalan yang dialihkan,                    whether it has correctly identified all of
       Grup menilai kembali apakah semua aset yang                       the assets acquired and all of the liabilities
       diakuisisi dan liabilitas yang diambil alih sudah                 assumed and reviews the procedures used to
       diidentifikasi dengan benar dan memeriksa                         measure the amounts to be recognized at
       prosedur yang digunakan untuk mengukur nilai                      the acquisition date. If the reassessment still
       yang harus diakui pada tanggal akuisisi. Jika                     results in an excess of the fair value of net
       hasil penilaian kembali tersebut masih                            assets      acquired     over   the    aggregate
       menghasilkan selisih lebih atas nilai wajar dari                  consideration transferred, then the gain is
       aset neto diakuisisi atas nilai agregat imbalan                   recognized in profit or loss.
       yang dialihkan, maka keuntungan diakui pada
       laba rugi.

       Saat penentuan imbalan dari kombinasi bisnis                      When the determination of consideration from a
       termasuk     imbalan    kontinjensi,   imbalan                    business combination includes contingent
       kontinjensi ini diukur pada nilai wajar saat                      consideration, it is measured at its fair value on
       tanggal     akuisisi.  Imbalan       kontinjensi                  acquisition date. Contingent consideration is

                                                             - 30 -
Page 34
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

        diklasifikasikan sebagai ekuitas atau liabilitas                  classified either as equity or a financial liability.
        keuangan. Jumlah yang diklasifikasikan sebagai                    Amounts classified as a financial liability are
        liabilitas keuangan selanjutnya diukur kembali                    subsequently remeasured to fair value with
        pada nilai wajar dimana perubahan pada nilai                      changes in fair value recognized in profit or loss
        wajar tersebut diakui dalam laba rugi atau ketika                 when adjustments are recorded outside
        penyesuaian dicatat diluar periode pengukuran.                    the measurement period. Changes in the fair
        Perubahan pada nilai wajar imbalan kontinjensi                    value of the contingent consideration that qualify
        yang       memenuhi      persyaratan     sebagai                  as measurement period adjustments are
        penyesuaian periode pengukuran, disesuaikan                       adjusted retrospectively, with corresponding
        secara retrospektif, dengan penyesuaian terkait                   adjustments       made       against     goodwill.
        terhadap      goodwill.  Penyesuaian periode                      Measurement        period     adjustments       are
        pengukuran adalah penyesuaian yang timbul                         adjustments that arise from additional
        dari informasi tambahan yang didapat selama                       information obtained during the measurement
        periode pengukuran, yang tidak boleh melebihi                     period, which cannot exceed one year from
        satu tahun dari tanggal akusisi, tentang fakta                    the acquisition date, about facts and
        dan kondisi yang ada pada saat tanggal akuisisi                   circumstances that existed at the acquisition
                                                                          date.

        Dalam suatu kombinasi bisnis yang dilakukan                       In a business combination that is achieved in
        secara bertahap, pihak pengakuisisi mengukur                      stages, the acquirer remeasures its previously
        kembali kepentingan ekuitas yang dimiliki                         held equity interest in the acquiree at its
        sebelumnya pada pihak diakuisisi pada nilai                       acquisition-date fair value and recognizes gain
        wajar    tanggal   akuisisi dan     mengakui                      or loss resulting, if there is any, in profit or loss.
        keuntungan atau kerugian yang dihasilkan, jika
        ada, dalam laba rugi.

   e.   Transaksi   dan   Penjabaran            Laporan              e.   Foreign    Currency      Transactions            and
        Keuangan dalam Mata Uang Asing                                    Translation of Financial Statements

        Dalam     menyiapkan      laporan    keuangan                     In preparing consolidated financial statements,
        konsolidasian,   Grup      mencatat    dengan                     the Group record by using the currency of
        menggunakan mata uang dari lingkungan                             the primary economic environment where
        ekonomi utama di mana entitas beroperasi                          the entity operates (“the functional currency”).
        (“mata uang fungsional”). Mata uang fungsional                    The functional currency of the Group is Rupiah
        Grup adalah Rupiah (Rp).                                          (Rp).

        Mata uang fungsional kantor cabang di Dubai,                      The functional currency of branch offices in
        Malaysia dan Timor Leste, adalah Arab                             Dubai, Malaysia and Timor Leste are United
        Emirates Dirham (AED), Saudi Arabian Riyal                        Arab Emirates Dirham (AED), Saudi Arabian
        (SAR), Ringgit (MYR) dan Dolar Amerika                            Riyal (SAR), Ringgit (MYR) and United States
        Serikat (USD). Untuk tujuan penyajian laporan                     Dollar (USD), respectively. For presentation
        keuangan konsolidasian, aset dan liabilitas                       purposes of consolidated financial statements,
        Kantor cabang di Dubai dan Timor Leste, pada                      assets and liabilities of branches in Dubai and
        tanggal laporan dijabarkan ke Rupiah (Rp)                         Timor Leste at reporting date are translated to
        menggunakan kurs penutup yang berlaku pada                        Rupiah (Rp) at the closing rate at statement of
        tanggal laporan posisi keuangan, sedangkan                        financial position date, while revenues and
        pendapatan dan beban dijabarkan dengan                            expenses are translated using average rate for
        menggunakan kurs rata-rata. Untuk tujuan                          the     period.    For    combining   purposes,
        penggabungan, laporan keuangan kantor                             the financial statements of the branch office are
        cabang luar negeri dijabarkan dalam Rupiah                        translated into Rupiah (Rp) based on Reuters
        (Rp) dengan kurs Reuters, sedangkan kantor                        Rate, while Malaysia and Timor Leste Branch
        cabang     Malaysia     dan   Timor      Leste                    maintained in Ringgit and United Stated Dollar
        menggunakan mata uang Ringgit dan Dolar                           (USD) using Bank Indonesia (BI) rate. All
        Amerika Serikat (USD) dengan kurs Bank                            resulting exchange differences shall be
        Indonesia (BI). Selisih kurs yang dihasilkan                      recognized in other comprehensive income.
        diakui dalam penghasilan komprehensif lain.

        Dalam penyusunan laporan keuangan setiap                          In preparing the financial statements of each
        entitas individual grup, transaksi dalam mata                     individual group entity, transactions in
        uang asing selain mata uang fungsional entitas                    currencies other than the entity’s functional
        (mata uang asing) diakui pada kurs yang                           currency (foreign currencies) are recognized at
        berlaku pada tanggal transaksi. Pada akhir                        the rates of exchange prevailing at the dates of
        periode pelaporan, pos moneter dalam mata                         the transactions. At the end of reporting period,

                                                            - 31 -
Page 35
PT WASKITA KARYA (PERSERO) Tbk                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                             (Expressed in Rupiah, unless otherwise stated)

        uang asing dijabarkan ke dalam Rupiah (Rp)                              foreign currency monetary items are translated
        menggunakan kurs penutup, yaitu kurs tengah                             to Rupiah (Rp) using the closing rate, i.e middle
        BI pada tanggal 30 September 2024 dan 31                                rate of BI as of September 30, 2024 and
        Desember 2023 sebagai berikut:                                          December 31, 2023 as follows:
                                                       30 September/         31 Desember/
                                                     September 30, 2024    December 31, 2023
                                                            Rp                    Rp

            Dolar Amerika Serikat (USD)                          15.138               15.731                           U.S Dollar (USD)
            Euro Eropa (EUR)                                     16.852               16.713                      European Euro (EUR)
            Ringgit Malaysia (MYR)                                3.675                3.556                   Malaysian Ringgit (MYR)
            Riyal Arab Saudi (SAR)                                4.036                4.184                  Saudi Arabian Riyal (SAR)
            Yen Jepang (JPY)                                        106                  118                        Japanese Yen (JPY)


        Pos-pos non-moneter yang diukur pada nilai                              Non-monetary items carried at fair value that are
        wajar dalam valuta asing dijabarkan kembali                             denominated in foreign currencies are
        pada kurs yang berlaku pada tanggal ketika nilai                        retranslated at the rates prevailing at the date
        wajar ditentukan. Pos nonmoneter yang diukur                            when the fair value was determined. Non-
        dalam biaya historis dalam valuta asing tidak                           monetary items that are measured in terms of
        dijabarkan kembali.                                                     historical cost in a foreign currency are not
                                                                                retranslated.

        Selisih kurs atas pos moneter diakui dalam laba                         Exchange differences on monetary items are
        rugi pada periode saat terjadinya kecuali untuk:                        recognized in profit or loss in the period in which
                                                                                they arise except for:
        -       Selisih kurs atas pinjaman valuta asing                         -   Exchange differences on foreign currency
                yang berkaitan dengan aset dalam                                    borrowings relating to assets under
                konstruksi      untuk    penggunaan       yang                      construction for future productive use, which
                produktif di masa depan, termasuk dalam                             are included in the cost of those assets
                biaya perolehan aset tersebut ketika                                when they are regarded as an adjustment to
                dianggap sebagai penyesuaian atas biaya                             interest costs on those foreign currency
                bunga atas pinjaman valuta asing.                                   borrowing.
        -       Selisih kurs atas transaksi yang ditetapkan                     -   Exchange differences on transaction
                untuk tujuan lindung nilai risiko valuta asing                      entered into in order to hedge certain
                tertentu.                                                           foreign currency risks.
        -       Selisih kurs atas pos moneter piutang atau                      -   Exchange differences on monetary items
                utang dari kegiatan usaha luar negeri yang                          receivable from or payable to a foreign
                penyelesaiannya tidak direncanakan atau                             operation for which settlement is neither
                tidak mungkin terjadi (membentuk bagian                             planned nor likely to occur (therefore
                dari investasi bersih dalam kegiatan usaha                          forming part of the net investment in
                luar negeri), yang pada awalnya diakui                              the foreign operation), which are recognized
                pada penghasilan komprehensif lain dan                              initially in other comprehensive income and
                direklasifikasi dari ekuitas ke laba rugi pada                      reclassified from equity to profit or loss on
                pembayaran kembali pos moneter.                                     repayment of the monetary items.

   f.   Transaksi dan Saldo dengan Pihak Berelasi                          f.   Related Party Transactions and Balances

        Pihak berelasi adalah orang atau entitas yang                           A related party is a person or an entity that is
        terkait dengan entitas pelapor:                                         related to the Group:

        a)      Orang atau anggota keluarga dekatnya                            a)   A person or a close member of that
                mempunyai relasi dengan entitas pelapor                              person’s family is related to a reporting
                jika orang tersebut:                                                 entity if that person:

                  i. Memiliki       pengendalian       atau                           i. Has control or joint        control    over
                     pengendalian bersama atas entitas                                   the reporting entity;
                     pelapor;
                 ii. Memiliki pengaruh signifikan atas                                ii. Has     significant      influence  over
                     entitas pelapor; atau                                                the reporting entity; or
                iii. Merupakan personil manajemen kunci                              iii. Is a member of the key management
                     entitas pelapor atau entitas induk dari                              personnel of the reporting entity or of a
                     entitas pelapor.                                                     parent of the reporting entity.


                                                                  - 32 -
Page 36
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

       b)    Suatu entitas berelasi dengan entitas                         b)    An entity is related to the reporting entity if
             pelapor jika memenuhi salah satu hal                                any of the following conditions applies:
             berikut:
               i. Entitas dan entitas pelapor adalah                              i. The entity and the reporting entity are
                  anggota dari kelompok usaha yang                                   members of the same group (which
                  sama (artinya entitas induk, entitas                               means that each parent, subsidiary and
                  anak, dan entitas anak berikutnya                                  fellow subsidiary      is   related    to
                  saling berelasi dengan entitas lain);                              the others);
              ii. Satu entitas adalah entitas asosiasi                           ii. One entity is an associate or joint
                  atau ventura bersama dari entitas lain                             venture of the other entity (or an
                  (atau entitas asosiasi atau ventura                                associate or joint venture of a member
                  bersama yang merupakan anggota                                     of a group of which the other entity is a
                  suatu kelompok usaha, yang mana                                    member);
                  entitas      lain     tersebut     adalah
                  anggotanya);
             iii. Kedua entitas tersebut adalah ventura                          iii. Both entities are joint ventures of
                  bersama dari pihak ketiga yang sama;                                the same third party;
             iv. Satu entitas adalah ventura bersama                             iv. One entity is a joint venture of a third
                  dari entitas ketiga dan entitas yang lain                           entity and the other entity is an
                  adalah entitas asosiasi dari entitas                                associate of the third entity;
                  ketiga;
              v. Entitas tersebut adalah suatu program                           v. The entity is a post-employment benefit
                  imbalan pasca kerja untuk imbalan                                  plan for the benefit of employees of
                  kerja dari salah satu entitas pelapor                              either the reporting entity, or an entity
                  atau entitas yang terkait dengan entitas                           related to the reporting entity.
                  pelapor. Jika entitas pelapor adalah                               If the reporting         entity           is
                  entitas      yang      menyelenggarakan                            the      entity that organized the plan,
                  program tersebut, maka entitas sponsor                             the sponsoring employers are          also
                  juga berelasi dengan entitas pelapor;                              related to the reporting entity;
             vi. Entitas      yang     dikendalikan     atau                     vi. The entity is controlled or jointly
                  dikendalikan bersama oleh orang yang                               controlled by a person identified in (a);
                  diidentifikasi dalam huruf (a);
            vii. Orang yang diidentifikasi dalam huruf                          vii. A person identified in (a) (i) has
                  (a) (i) memiliki pengaruh signifikan atas                           significant influence over the entity or is
                  entitas atau merupakan personil                                     a member of the key management
                  manajemen kunci entitas (atau entitas                               personnel of the entity (or a parent of
                  induk dari entitas); atau                                           the entity); or
            viii. Entitas, atau anggota dari kelompok                           viii. The entity, or any member of a group of
                  yang mana entitas merupakan bagian                                  which it is a part, provides key
                  dari kelompok tersebut, menyediakan                                 management personnel services to
                  jasa personil manajemen kunci kepada                                the reporting entity or to the parent of
                  entitas pelapor atau kepada entitas                                 the reporting entity (Note 57).
                  induk dari entitas pelapor (Catatan 57).

       Entitas yang berelasi dengan Pemerintah                             A Government-related entity is an entity that is
       adalah entitas yang dikendalikan, dikendalikan                      controlled, jointly controlled or significantly
       bersama, atau dipengaruhi oleh Pemerintah.                          influenced by the government. Government
       Pemerintah mengacu kepada pemerintah,                               refers to Government, Government agencies
       instansi Pemerintah dan badan yang serupa                           and similar bodies whether local, national or
       baik lokal, nasional maupun internasional.                          international.

       Entitas yang berelasi dengan Pemerintah dapat                       Government-related entity can be an entity that
       berupa entitas yang dikendalikan oleh                               is controlled by the Government of Republic of
       Pemerintah     Republik    Indonesia  melalui                       Indonesia, represented by the BUMN’s Ministry
       Kementerian BUMN sebagai kuasa pemegang                             as a shareholder’s representative.
       saham.

       Transaksi signifikan yang dilakukan dengan                          Significant transactions with related parties,
       pihak-pihak berelasi, baik dilakukan dengan                         whether or not made at similar terms and
       kondisi dan persyaratan yang sama dengan                            conditions as those done with third parties, are
       pihak ketiga maupun tidak, diungkapkan pada                         disclosed in the consolidated financial
       laporan keuangan konsolidasian.                                     statements.
                                                               - 33 -
Page 37
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)


   g.   Instrumen keuangan                                             g. Financial instruments

        Instrumen keuangan adalah setiap kontrak yang                     A financial instrument is any contract that gives
        memberikan kenaikan nilai aset keuangan dari                      rise to a financial asset of one entity and a
        satu entitas dan liabilitas keuangan atau                         financial liability or equity instrument of another
        instrumen ekuitas dari entitas lainnya.                           entity.

        1.   Aset keuangan                                                1.   Financial
                                                                               2         assets

             Pengakuan awal                                                    Initial recognition

             Klasifikasi dan pengukuran aset keuangan                          Classification and measurement of financial
             harus didasarkan pada bisnis model dan                            assets are based on business model and
             arus kas kontraktual - apakah semata dari                         contractual cash flows - whether from solely
             pembayaran pokok dan bunga.                                       payment of principal and interest.

             Aset keuangan diklasifikasikan dalam dua                          Financial assets are classified in the two
             kategori sebagai berikut:                                         categories as follows:

             •   Aset keuangan yang diukur dengan                              •   Financial assets at amortised cost.
                 biaya diamortisasi.
             •   Aset keuangan yang diukur dengan                              •   Financial assets at Fair Value Through
                 nilai wajar melalui laba rugi atau melalui                        Profit and Loss (FVTPL) or Other
                 penghasilan komprehensif lain.                                    Comprehensive Income (FVOCI).

             Grup menentukan klasifikasi aset keuangan                         The Group determines the classification of
             tersebut pada pengakuan awal dan tidak                            its financial assets at initial recognition and
             bisa   melakukan    perubahan      setelah                        can not change the classification already
             pengakuan awal tersebut.                                          made at initial recognition.

             Pada pengakuan awal, Grup mengukur aset                           At initial recognition, the Group measures a
             keuangan pada nilai wajarnya ditambah,                            financial asset at its fair value plus, in
             dalam hal aset keuangan tidak diukur pada                         the case of a financial asset not at fair value
             nilai wajar melalui laporan laba rugi, biaya                      through profit or loss, transaction costs that
             transaksi yang dapat diatribusikan secara                         are directly attributable to the acquisition of
             langsung dengan perolehan aset keuangan.                          the financial asset. Transaction costs of
             Biaya transaksi aset keuangan yang dicatat                        financial assets carried at fair value through
             pada nilai wajar melalui laba rugi                                profit or loss are expensed in profit or loss.
             dibebankan pada laba rugi.

             Pembelian atau penjualan aset keuangan                            Purchases or sales of financial assets that
             yang memerlukan penyerahan aset dalam                             require delivery of assets within a time
             kurun waktu yang ditetapkan oleh peraturan                        frame established by regulation or
             atau kebiasaan yang berlaku di pasar                              convention in the market place (regular way
             (perdagangan yang lazim) diakui pada                              trades) are recognized on the trade date,
             tanggal perdagangan, yaitu pada tanggal                           i.e., the date that the Group commits to
             Grup berkomitmen untuk membeli atau                               purchase or sell the assets.
             menjual aset tersebut.

             Aset keuangan Grup meliputi kas dan                               The Group’s financial assets include cash
             setara kas, piutang usaha dan piutang                             and cash equivalents, trade and other
             lainnya, piutang pihak berelasi, aset lancar                      receivables, due from related parties, other
             lain-lain, dan aset keuangan tidak lancar                         current assets and other non-current
             lainnya (instrumen keuangan yang memiliki                         financial assets (quoted and unquoted
             dan tidak memiliki kuotasi harga). Aset                           financial instruments). Financial assets in
             keuangan diklasifikasikan sebagai aset                            this category are classified as current
             lancar, jika jatuh tempo dalam waktu 12                           assets if expected to be settled within 12
             bulan, jika tidak maka aset keuangan ini                          months, otherwise they are classified as
             diklasifikasikan sebagai aset tidak lancar.                       non-current.

             Pengukuran setelah pengakuan awal                                 Subsequent measurement

             Pengukuran     aset     keuangan    setelah                       The subsequent measurement of financial
             pengakuan      awal      tergantung   pada                        assets depends on their classification as

                                                              - 34 -
Page 38
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

            klasifikasinya sebagai berikut:                                   follows:

            •   Aset keuangan yang diukur dengan                              •   Financial assets at amortised cost.
                biaya diamortisasi.

                Aset keuangan yang diukur dengan                                  Financial assets at amortized cost are
                biaya diamortisasi selanjutnya diukur                             subsequently        measured         using
                dengan menggunakan metode suku                                    the Effective Interest Rate (“EIR”)
                bunga efektif (Effective Interest Rate)                           method, less impairment. Amortized
                (“EIR”), setelah dikurangi dengan                                 cost is calculated by taking into account
                penurunan nilai. Biaya perolehan yang                             any discount or premium on acquisition
                diamortisasi       dihitung     dengan                            fees or costs that are an integral part of
                memperhitungkan diskonto atau premi                               the EIR. The EIR amortization is
                atas biaya akuisisi atau biaya yang                               included in the profit or loss. The losses
                merupakan bagian integral dari EIR                                arising from impairment are also
                tersebut. Amortisasi EIR dicatat dalam                            recognized in the profit or loss.
                laporan laba rugi. Kerugian yang timbul
                dari penurunan nilai juga diakui pada
                laporan laba rugi.

            •   Aset keuangan yang diukur pada nilai                          •   Financial assets at fair value through
                wajar melalui laporan laba rugi.                                  profit or loss

                Aset keuangan yang diukur pada nilai                              Financial assets at fair value through
                wajar melalui laporan laba rugi                                   profit or loss are subsequently carried
                selanjutnya disajikan dalam laporan                               in the statement of financial position at
                posisi keuangan sebesar nilai wajar,                              fair value, with changes in fair value
                dengan perubahan nilai wajar yang                                 recognized in the profit or loss.
                diakui dalam laporan laba rugi.

            Grup memiliki investasi dalam instrumen                           The Group has investments in equity
            ekuitas, yang diklasifikasikan sebagai aset                       instruments, which are classified as
            keuangan yang diukur pada nilai wajar                             financial asset at fair value through profit
            melalui laba rugi.                                                and loss.

       2.   Liabilitas keuangan                                          2.   Financial
                                                                              2         liabilities

            Pengakuan awal                                                    Initial recognition

            Liabilitas keuangan dalam lingkup PSAK 71                         Financial liabilities within the scope of PSAK
            diklasifikasikan sebagai berikut:                                 71 are classified as follows:

            •   Liabilitas keuangan yang diukur dengan                        •   Financial assets at amortised cost.
                biaya diamortisasi.
            •   Liabilitas keuangan yang diukur dengan                        •   Financial liabilities at Fair Value
                nilai wajar melalui laba rugi atau melalui                        Through Profit and Loss (FVTPL) or
                penghasilan komprehensif lain.                                    Other Comprehensive Income (FVOCI).

            Grup menentukan klasifikasi liabilitas                            The Group determines the classification of
            keuangan mereka pada saat pengakuan                               its financial liabilities at initial recognition.
            awal.

            Seluruh liabilitas keuangan diakui pada                           All financial liabilities are recognized initially
            awalnya sebesar nilai wajar dan, dalam hal                        at fair value and, in the case of loans and
            pinjaman dan utang, termasuk biaya                                borrowings, inclusive of directly attributable
            transaksi yang dapat diatribusikan secara                         transaction costs.
            langsung.

            Liabilitas keuangan Grup meliputi utang                           The Group’s financial liabilities include trade
            usaha, utang pengadaan, akrual, pinjaman                          payables, procurement payable, accruals,
            dan utang obligasi, utang pihak berelasi,                         loans and bonds payable, due to related
            uang muka kontrak, liabilitas keuangan                            parties, deposits from contract, and other
            jangka pendek, dan jangka panjang lain-                           current and non-current financial liabilities.
            lain. Liabilitas keuangan diklasifikasikan                        Financial liabilities are classified as non

                                                             - 35 -
Page 39
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

            sebagai liabilitas jangka panjang jika jatuh                      current liabilities when the remaining
            tempo melebihi 12 bulan dan sebagai                               maturity is more than 12 months, and as
            liabilitas jangka pendek jika jatuh tempo                         current liabilities when the remaining
            yang tersisa kurang dari 12 bulan.                                maturity is less than 12 months.

            Pengukuran setelah pengakuan awal                                 Subsequent measurement

            Liabilitas keuangan yang diukur dengan                            Financial liabilities at amortized cost
            biaya diamortisasi.

            Liabilitas keuangan yang diukur pada biaya                        Financial liabilities at amortized cost (e.g
            amortisasi (misalnya pinjaman dan utang                           interest-bearing loans and borrowings) are
            yang dikenakan bunga) selanjutnya diukur                          subsequently measured using the EIR
            dengan      menggunakan     metode    EIR.                        method. The EIR amortization is included in
            Amortisasi EIR termasuk di dalam biaya                            finance costs in the profit or loss.
            keuangan dalam laporan laba rugi.

            Keuntungan atau kerugian diakui dalam                             Gains or losses are recognized in the profit
            laporan laba rugi pada saat liabilitas                            or loss when the liabilities are derecognized
            tersebut dihentikan pengakuannya serta                            as well as through the EIR amortization
            melalui proses amortisasi EIR.                                    process.

            Sukuk diakui sebesar nilai nominal,                               Sharia bond is recognized initially at
            disesuaikan dengan premium atau diskonto                          nominal value, adjusted with premium or
            dan biaya transaksi terkait. Perbedaan                            discount and the related transaction costs
            antara nilai tercatat dan nilai nominal diakui                    incurred. Any differences between carrying
            pada laporan laba rugi sebagai beban                              amount and nominal value is recognized in
            transaksi sukuk menggunakan metode garis                          the profit or loss as sharia bond transaction
            lurus selama jangka waktu sukuk.                                  costs using the straight-line method during
                                                                              the period of sharia bond.
            Imbal hasil terkait dibebankan dalam                              The related return element is charged to
            laporan laba rugi sebagai biaya keuangan.                         the profit or loss as finance cost.
            Sukuk,    setelah       disesuaikan dengan                        Sharia bond, adjusted with unamortized
            premium atau diskonto dan biaya transaksi                         premium or discount and transaction costs,
            yang belum diamortisasi, disajikan sebagai                        is presented as part of liabilities.
            bagian dari liabilitas.

       3.   Instrumen keuangan disalinghapus                             3.   Offsetting
                                                                              2          of financial instruments
            Aset keuangan dan liabilitas keuangan                             Financial assets and financial liabilities are
            disalinghapus dan nilai bersihnya disajikan                       offset and the net amount reported in
            dalam laporan posisi keuangan jika, dan                           the statement of financial position if, and
            hanya jika, entitas saat ini memiliki hak                         only if, there is a currently enforceable legal
            yang dapat dipaksakan secara hukum untuk                          right to offset the recognized amounts and
            melakukan saling hapus atas jumlah yang                           there is an intention to settle on a net basis,
            telah     diakui   dan    berniat    untuk                        or to realize the assets and settle
            menyelesaikan secara neto, atau untuk                             the liabilities simultaneously. The legally
            merealisasikan aset dan menyelesaikan                             enforceable right must not be contingent on
            kewajibannya secara simultan. Hak yang                            future events and must be enforceable in
            berkekuatan hukum tersebut tidak harus                            the normal course of business and in
            bergantung pada kejadian masa depan dan                           the event of default, insolvency or
            harus dapat dilaksanakan dalam kegiatan                           bankruptcy of the Group or the
            usaha normal dan dalam hal gagal bayar,                           counterparty.
            pailit atau kebangkrutan dari Grup atau
            pihak lawan.

       4.   Penurunan nilai dari aset keuangan                           4.   Impairment
                                                                              2          of financial assets
            PSAK     71    mengharuskan     cadangan                          PSAK 71 requires a loss allowance to be
            kerugian diakui sebesar kerugian kredit                           recognized at an amount equal to either 12-
            ekspektasian 12 bulan (12-month ECL) atau                         month or lifetime Expected Credit Losses
            kerugian kredit ekspektasian sepanjang                            (ECLs). Lifetime ECLs are the ECLs that

                                                             - 36 -
Page 40
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

           umur aset keuangan (lifetime ECL). Lifetime                     result from all possible default events over
           ECL adalah kerugian kredit ekspektasian                         the expected life of a financial instrument,
           yang berasal dari semua kemungkinan                             whereas 12-month ECLs are the portion of
           kejadian gagal bayar sepanjang umur                             ECLs that result from default events that are
           ekspektasian suatu instrumen keuangan,                          possible within the 12 months after
           sedangkan ECL 12 bulan adalah porsi dari                        reporting date.
           kerugian kredit ekspektasian yang berasal
           dari kemungkinan kejadian gagal bayar
           dalam 12 bulan setelah tanggal pelaporan.

           Kerugian kredit ekspektasian atau ECL                           ECLs are recognized for all account
           diakui untuk seluruh instrumen piutang                          receivables and financial guarantees that
           usaha dan jaminan keuangan yang                                 are classified as hold to collect/hold to
           diklasifikasikan sebagai hold to collect/hold                   collect and sell and have cash flows that are
           to collect and sell dan memiliki arus kas                       solely payments of principal and interest.
           SPPI. Kerugian kredit ekspektasian tidak                        Expected credit losses are not recognized
           diakui untuk instrumen ekuitas yang                             for equity instruments designated at FVOCI.
           ditetapkan sebagai FVOCI.

           Model ECL yang digunakan Perusahaan                             The ECL model used by the Company is a
           adalah model yang menggunakan matriks                           model that uses a probability of default (PD)
           probability   of    default   (PD)    yang                      matrix      which     is    discounted    using
           didiskontokan dengan menggunakan suku                           the effective interest rate. The probability at
           bunga efektif. Probabilitas yang timbul di                      a point in time that a counterparty will
           suatu waktu dimana debitur mengalami                            default, calibrated over up to 12 months
           gagal bayar, dikalibrasikan sampai dengan                       from the reporting date (Stage 1) or over
           12 bulan setelah tanggal pelaporan (Stage                       the lifetime of the product (Stage 2 and 3)
           1) atau sepanjang umur (Stage 2 dan 3)                          and       incorporating      the   impact    of
           dan digabungkan pada dampak asumsi                              forwardlooking economic assumptions that
           ekonomi masa depan yang memiliki risiko                         have an effect on credit risk. PD is
           kredit. PD diestimasikan pada point in time                     estimated at a point in time that means it
           dimana hal ini berfluktuasi sejalan dengan                      will fluctuate in line with the economic cycle.
           siklus ekonomi.

           Kerugian Kredit Ekspektasian 12 Bulan                           12 Months       Expected     Credit    Losses
           (Stage 1)                                                       (Stage 1)

           Kerugian kredit ekspektasian diakui pada                        Expected credit losses are recognized at
           saat pengakuan awal instrumen keuangan                          the time of initial recognition of a financial
           dan merepresentasikan kekurangan kas                            instrument and represent the lifetime cash
           sepanjang umur aset yang timbul dari                            shortfalls arising from possible default
           kemungkinan gagal bayar di masa yang                            events up to twelve months after
           akan datang dalam kurun waktu 12 bulan                          the reporting date. Expected credit losses
           setelah tanggal pelaporan. Kerugian kredit                      continue to be determined on this basis until
           ekspektasian terus ditentukan oleh dasar ini                    there is either a significant increase in
           sampai timbul peningkatan risiko kredit                         the credit risk of an instrument or the
           yang signifikan pada instrumen tersebut                         instrument becomes credit impaired. If an
           atau instrumen tersebut telah mengalami                         instrument is no longer considered to exhibit
           penurunan nilai kredit. Jika suatu Instrumen                    a significant increase in credit risk, expected
           tidak    lagi    dianggap      menunjukkan                      credit losses will revert to being determined
           peningkatan risiko kredit yang signifikan,                      on a twelve months basis after the reporting
           maka kerugian kredit ekspektasian dihitung                      date.
           kembali berdasarkan basis 12 bulan setelah
           tanggal pelaporan.

           Peningkatan Risiko Kredit yang Signifikan                       Significant Increase in Credit Risk (Stage 2)
           (Stage 2)

           Jika aset keuangan mengalami peningkatan                        If a financial asset experiences a significant
           risiko   kredit  yang  signifikan  sejak                        increase in credit risk since initial
           pengakuan       awal,  kerugian    kredit                       recognition, an expected credit loss
           ekspektasian diakui atas kejadian gagal                         provision is recognized for default events

                                                           - 37 -
Page 41
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

           bayar yang mungkin terjadi sepanjang umur                        that may occur over the lifetime of
           aset. Peningkatan signifikan dalam risiko                        the asset. Significant increase in credit risk
           kredit dinilai dengan membandingkan risiko                       is assessed by comparing the risk of default
           gagal bayar atas eksposur pada tanggal                           of an exposure at the reporting date to
           pelaporan dengan risiko gagal bayar saat                         the risk of default at origination (after taking
           pengakuan awal (setelah memperhitungkan                          into account the passage of time).
           perjalanan waktu dari akun tersebut).                            Significant does not mean statistically
           Signifikan tidak berarti signifikan secara                       significant nor is assessed in the context of
           statistik, juga tidak dinilai dalam konteks                      changes in expected credit loss
           perubahan dalam cadangan kerugian kredit
           ekspektasian.

           Eksposur yang Mengalami Penurunan Nilai                          Credit Impaired (or Defaulted) Exposures
           Kredit atau Gagal Bayar (Stage 3)                                (Stage 3)

           Aset keuangan yang mengalami penurunan                           Financial assets that are credit impaired (or
           nilai (atau gagal bayar) merupakan aset                          in default) represent those that are at least
           yang setidaknya telah memiliki tunggakan                         420 days past due after the reporting date.
           lebih dari 420 hari setelah tanggal                              Financial assets are also considered to be
           pelaporan. Aset keuangan juga dianggap                           credit impaired where the debtors are
           mengalami penurunan nilai kredit dimana                          unlikely to pay on the occurrence of one or
           debitur kemungkinan besar tidak akan                             more observable events that have
           membayar dengan terjadinya satu atau                             a detrimental impact on the estimated future
           lebih kejadian yang teramati yang memiliki                       cash flows of the financial asset. Loss
           dampak menurunkan jumlah estimasi arus                           provisions against credit impaired financial
           kas masa depan dari aset keuangan                                assets are determined based on an
           tersebut. Cadangan kerugian penurunan                            assessment of the recoverable cash flows
           nilai terhadap aset keuangan yang                                under a range of scenarios, including
           mengalami penurunan nilai ditentukan                             the realization of any collateral held where
           berdasarkan penilaian terhadap arus kas                          appropriate. The ECL will reflect weighted
           yang     dapat      dipulihkan   berdasarkan                     average of the scenarios based on
           sejumlah skenario, termasuk realisasi                            the probability of the relevant scenario to
           jaminan yang dimiliki jika memungkinkan.                         occur. The loss provisions held represent
           ECL      akan       mencerminkan      ratarata                   the difference between the present value of
           tertimbang dari skenario berdasarkan                             the cash flows expected to be recovered,
           probabilitas dari skenario yang relevan                          discounted at the instruments original
           untuk      terjadi.    Cadangan     kerugian                     effective interest rate, and the gross
           penurunan nilai merupakan selisih antara                         carrying value of the instrument prior to any
           nilai sekarang dari arus kas yang                                credit impairment.
           diperkirakan akan dipulihkan, didiskontokan
           pada suku bunga efektif awal, dan nilai
           tercatat     bruto     instrumen     sebelum
           penurunan nilai kredit.

           Periode   yang    diperhitungkan ketika                          The period considered when measuring
           mengukur kerugian kredit ekspektasian                            expected credit loss is the shorter of
           adalah periode yang lebih pendek antara                          the expected life and the contractual term of
           umur ekspektasian dan periode kontrak                            the financial asset. The expected life may
           aset keuangan. Umur ekspektasian dapat                           be impacted by prepayments and
           dipengaruhi oleh pembayaran dimuka dan                           the maximum contractual term by extension
           periode kontrak maksimum melalui opsi                            options.
           perpanjangan kontrak.

           Untuk aset yang diukur pada biaya                                For assets measured at amortized cost,
           perolehan diamortisasi, saldo di laporan                         the consolidated statement of financial
           posisi       keuangan        konsolidasian                       position amount reflects the gross asset
           mencerminkan       aset  bruto     dikurangi                     less the expected credit losses. For debt
           kerugian    kredit   ekspektasian.    Untuk                      instruments      held        at     FVOCI,
           instrumen utang dalam kategori FVOCI,                            the consolidated statement of financial
           saldo    di   laporan   posisi   keuangan                        position amount reflects the instruments fair
           konsolidasian mencerminkan nilai wajar dari                      value, with the expected credit loss
           instrumen, dengan cadangan kerugian                              allowance held as a separate reserve within

                                                            - 38 -
Page 42
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

            kredit ekspektasian     dibukukan terpisah                        other comprehensive income.
            sebagai cadangan         pada pendapatan
            komprehensif lain.

            Untuk     menentukan     kerugian    kredit                       To determine the expected credit loss,
            ekspektasian komponen-komponen ini akan                           these components are multiplied together
            diperhitungkan secara bersama-sama dan                            and discounted to the reporting date using
            didiskontokan ke tanggal laporan keuangan                         the effective interest rate as the discount
            menggunakan diskonto berdasarkan suku                             rate.
            bunga efektif.

       5.   Penghentian      pengakuan       aset    dan                 5.   Derecognition
                                                                              2             of financial assets and
            liabilitas keuangan                                               liabilities
            Aset keuangan                                                     Financial assets
            Aset keuangan (atau mana yang lebih                               A financial asset (or where applicable, a
            tepat, bagian dari aset keuangan atau                             part of a financial asset or part of a group of
            bagian dari kelompok aset keuangan                                similar financial assets) is derecognized
            serupa) dihentikan pengakuannya pada                              when: (1) the contractual rights to the cash
            saat: (1) hak kontraktual arus kas yang                           flows from the financial assets expire; or (2)
            berasal dari aset keuangan tersebut telah                         the Group has transferred its contractual
            berakhir; atau (2) Grup telah mengalihkan                         rights to receive the cash flows of
            hak kontraktual mereka untuk menerima                             the     financial    assets     or     retained
            arus kas yang berasal dari aset keuangan                          the contractual rights to receive the cash
            atau memiliki hak kontraktual untuk                               flows of the financial asset, but assumes a
            menerima arus kas yang berasal dari aset                          contractual obligation to pay the cash flows
            keuangan,      tetapi  juga   menanggung                          to one or more recipients.
            kewajiban kontraktual untuk membayar arus
            kas yang diterima tersebut kepada satu
            atau lebih pihak penerima.
            Liabilitas keuangan                                               Financial liabilities
            Liabilitas       keuangan        dihentikan                       A financial liability is derecognized when
            pengakuannya pada saat liabilitas tersebut                        the obligation under the liability is
            berakhir atau dibatalkan atau kadaluarsa.                         discharged or cancelled or has expired.

            Dalam hal suatu liabilitas keuangan yang                          When an existing financial liability is
            ada digantikan oleh liabilitas keuangan lain                      replaced by another from the same lender
            dari pemberi pinjaman yang sama dengan                            on substantially different terms, or the terms
            persyaratan      yang    berbeda       secara                     of an existing liability are substantially
            substansial,    atau    modifikasi     secara                     modified, such an exchange or modification
            substansial atas persyaratan dari suatu                           is treated as a derecognition of the original
            liabilitas yang ada, pertukaran atau                              liability and the recognition of a new liability,
            modifikasi tersebut diperlakukan sebagai                          and the difference in the respective carrying
            penghentian pengakuan liabilitas awal dan                         amounts is recognized in the profit or loss.
            pengakuan liabilitas baru, dan selisih antara
            nilai tercatat masing-masing liabilitas diakui
            dalam laporan laba rugi.
       6.   Nilai wajar instrumen keuangan                               6.   Fair
                                                                              2 value of financial instruments
            Grup menilai instrumen keuangan, sebesar                          The Group measures financial instruments,
            nilai wajar pada setiap tanggal laporan                           at fair value at each statement of financial
            posisi keuangan.                                                  position date.
            Nilai wajar adalah harga yang akan diterima                       Fair value is the price that would be
            untuk menjual suatu aset atau harga yang                          received to sell an asset or paid to transfer
            akan dibayar untuk mengalihkan suatu                              a liability in an orderly transaction between
            liabilitas dalam transaksi teratur antara                         market participants at the measurement
            pelaku pasar pada tanggal pengukuran.                             date.

            Pengukuran nilai wajar mengasumsikan                              The fair value measurement is based on
            bahwa transaksi untuk menjual aset atau                           the presumption that the transaction to sell
                                                             - 39 -
Page 43
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

           mengalihkan liabilitas terjadi:                                   the asset or transfer the liability takes place
                                                                             either:

           •   Di pasar utama untuk aset dan liabilitas                      •   In the principal market for the asset and
               tersebut, atau                                                    liability, or
           •   Jika tidak terdapat pasar utama, di                           •   In the absence of a principal market, in
               pasar yang paling menguntungkan                                   the most advantageous market for
               untuk aset atau liabilitas tersebut.                              the asset or liability.
           Grup harus memiliki akses ke pasar utama                          The principal or the most advantageous
           atau pasar yang paling menguntungkan.                             market must be accessible to by the Group.
           Nilai wajar aset atau liabilitas diukur                           The fair value of an asset or a liability is
           menggunakan asumsi yang akan digunakan                            measured using the assumptions that
           pelaku pasar ketika menentukan harga aset                         market participants would use when pricing
           atau liabilitas tersebut, dengan asumsi                           the asset or liability, assuming that market
           bahwa pelaku pasar utamanya bertindak                             participants act in their economic best
           untuk kepentingan ekonomi terbaik mereka.                         interest.
           Pengukuran nilai wajar atas aset non-                             A fair value measurement of a non-financial
           keuangan memperhitungkan kemampuan                                asset takes into account a market
           pelaku pasar dalam menghasilkan manfaat                           participant's ability to generate economic
           ekonomi tertinggi dalam penggunaan aset                           benefits by using the asset in its highest
           atau dengan menjualnya kepada pelaku                              and best use or by selling it to another
           pasar lain yang akan menggunakan aset                             market participant that would use the asset
           tersebut secara maksimal.                                         in its highest and best use.
           Grup menggunakan teknik penilaian yang                            The Group uses valuation techniques that
           sesuai dengan keadaan dan dimana data                             are appropriate in the circumstances and for
           memadai tersedia untuk mengukur nilai                             which sufficient data are available to
           wajar, memaksimalkan penggunaan input                             measure fair value, maximizing the use of
           yang dapat diobservasi yang relevan dan                           relevant observable inputs and minimizing
           meminimalkan penggunaan input relevan                             the use of unobservable inputs.
           yang tidak dapat diobservasi.
           Semua aset dan liabilitas dimana nilai wajar                      All assets and liabilities for which fair value
           diukur atau diungkapkan dalam laporan                             is measured or disclosed in the financial
           keuangan dapat dikategorikan pada level                           statements are categorized within the fair
           hierarki nilai wajar, sebagaimana dijelaskan                      value hierarchy, described as follows,
           di bawah ini, berdasarkan tingkatan input                         based on the lowest level input that is
           terendah yang signifikan atas pengukuran                          significant to the fair value measurement as
           nilai wajar secara keseluruhan:                                   a whole:
           •   Level 1 - Harga kuotasian (tanpa                              •   Level 1 - Quoted (unadjusted) market
               penyesuaian) di pasar aktif untuk aset                            prices in active markets for identical
               atau liabilitas yang identik;                                     assets or liabilities;
           •   Level 2 - Teknik penilaian dimana input                       •   Level 2 - Valuation techniques for which
               level terendah yang signifikan terhadap                           the lowest level input that is significant
               pengukuran nilai wajar yang dapat                                 to the fair value measurement is directly
               diobservasi baik secara langsung atau                             or indirectly observable;
               tidak langsung;
           •   Level 3 - Teknik penilaian dimana input                       •   Level 3 - Valuation techniques for which
               level terendah yang signifikan terhadap                           the lowest level input that is significant
               pengukuran        yang      tidak dapat                           to the fair value measurement is
               diobservasi.                                                      unobservable.
           Untuk aset dan liabilitas yang diakui                             For assets and liabilities that are recognized
           sebesar nilai wajar dalam laporan keuangan                        at fair value in the financial statements on a
           secara berulang, Grup menentukan apakah                           recurring basis, the Group determines
           terjadi transfer antara level di dalam hierarki                   whether transfers have occurred between
           dengan      cara    mengevaluasi      kategori                    levels in the hierarchy by re-assessing
           (berdasarkan input level terendah yang                            categorization (based on the lowest level
           signifikan dalam pengukuran nilai wajar                           input that is significant to the fair value
           secara keseluruhan) pada setiap akhir                             measurement as a whole) at the end of
           periode pelaporan.                                                each reporting period.
                                                             - 40 -
Page 44
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)


            Untuk tujuan pengungkapan nilai wajar,                             For the purpose of fair value disclosures,
            Grup telah menentukan kategori aset dan                            the Group has determined classes of assets
            liabilitas berdasarkan sifat, karakteristik,                       and liabilities on the basis of the nature,
            dan risiko dari aset atau liabilitas tersebut,                     characteristics and risks of the asset or
            dan level hierarki nilai wajar seperti                             liability and the level of the fair value
            dijelaskan di atas.                                                hierarchy as explained above.
            Penyesuaian risiko kredit                                          Credit risk adjustment
            Grup melakukan penyesuaian harga dalam                             The Group adjusts the price in the more
            kondisi pasar yang lebih menguntungkan                             advantageous market to reflect any
            untuk mencerminkan adanya perbedaan                                differences in counterparty credit risk
            risiko kredit di pihak lawan antara instrumen                      between instruments traded in that market
            yang diperdagangkan di pasar tersebut                              and the ones being valued for financial
            dengan instrumen yang sedang dinilai untuk                         asset positions. In determining the fair value
            posisi aset keuangan. Dalam menentukan                             of financial liability positions, the Group's
            nilai wajar liabilitas keuangan, risiko kredit                     own      credit     risk   associated     with
            Grup terkait dengan instrumen harus                                the instrument is taken into account.
            diperhitungkan.
   h.   Kas dan Setara Kas                                            h.   Cash and Cash Equivalents
        Kas dan setara kas termasuk kas, kas di bank                       Cash and cash equivalents are cash on hand,
        (rekening giro), dan deposito berjangka yang                       cash in banks (demand deposits) and time
        jatuh tempo dalam jangka waktu tiga bulan atau                     deposits with maturity periods of three months
        kurang pada saat penempatan yang tidak                             or less at the time of placement that are not
        digunakan sebagai jaminan atau tidak dibatasi                      used as collateral or are not restricted.
        penggunaannya.
        Rekening yang dibatasi penggunaannya dan                           Current accounts which are restricted and or
        atau digunakan sebagai jaminan diklasifikasi                       used as security are classified as current assets
        sebagai bagian aset lancar jika jatuh temponya                     when the maturities are less than 12 months
        kurang dari 12 bulan setelah akhir periode                         after the end of reporting period.
        pelaporan.
   i.   Bank yang Dibatasi Penggunaannya                              i.   Restricted Bank
        Rekening bank yang dijaminkan atau dibatasi                        Current bank accounts which are used as
        penggunaannya, disajikan sebagai rekening                          collateral or are restricted, are presented as
        bank yang dibatasi penggunaannya.                                  restricted cash in bank.
   j.   Investasi Jangka Pendek                                       j.   Short-Term Investment
        Deposito berjangka yang jatuh temponya                             Time deposits with maturity of less than three
        kurang dari tiga bulan pada saat penempatan                        months from the date of placement and pledged
        namun dijaminkan, atau telah ditentukan                            as collateral, or restricted and time deposits with
        penggunaannya dan deposito berjangka yang                          maturity of more than three months from
        jatuh temponya lebih dari tiga bulan setelah                       the date of placement is presented as short-
        tanggal penempatan disajikan sebagai investasi                     term investment. The time deposits are
        jangka pendek. Deposito berjangka disajikan                        presented using par value.
        berdasarkan nilai nominal.
   k.   Piutang Retensi                                               k.   Retention Receivables
        Piutang retensi merupakan piutang Grup                             Retention receivable represents the Group’s
        kepada pemberi kerja yang akan dilunasi                            receivable from the owner of the project which
        setelah penyelesaian kontrak atau pemenuhan                        will be paid after completion of the contract or
        kondisi yang ditentukan kontrak. Piutang retensi                   fulfillment of certain conditions in the contract.
        dicatat pada saat pemotongan sejumlah                              Retention receivable is recorded at certain
        persentase tertentu dari setiap tagihan termin                     percentage      applied    in    every    account
        untuk ditahan oleh pemberi kerja sampai suatu                      receivable’s       claim which is retained by
        kondisi setelah penyelesaian kontrak dipenuhi.                     the owner of the project up to certain condition
                                                                           after completion of the contract has been met.




                                                             - 41 -
Page 45
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   l.   Tagihan Bruto kepada Pengguna Jasa                         l.   Gross Amount Due from Customers
        Tagihan bruto kepada pemberi kerja merupakan                    Gross amount due from customers represents
        piutang Grup yang berasal dari pekerjaan                        the Group’s receivable originated from
        kontrak konstruksi yang dilakukan namun                         construction contract in progress. Gross amount
        pekerjaan yang dilakukan masih dalam                            due from customers is presented as the net
        pelaksanaan. Tagihan bruto disajikan sebesar                    amount of costs incurred plus recognized
        selisih antara biaya yang terjadi ditambah laba                 profits, minus the sum of recognized losses and
        yang diakui dikurangi dengan kerugian yang                      progress billings.
        diakui dan termin.

        Tagihan bruto diakui sebagai pendapatan                         Gross amount due from customers is
        sesuai      dengan       metode     persentase                  recognized as revenue based on the percentage
        penyelesaian yang dinyatakan dalam berita                       of completion method which is stated on
        acara penyelesaian pekerjaan, dimana faktur                     the certificate of work completion, while
        belum dapat ditagihkan karena perbedaan                         the invoice is still unbilled due to the difference
        antara tanggal berita acara kemajuan (progress)                 between the date of physical progress
        fisik dengan pengajuan penagihan pada tanggal                   certificates and the submission of billing on
        laporan posisi keuangan konsolidasian.                          the consolidated statement of financial position
                                                                        date.

   m. Biaya Dibayar Dimuka                                         m. Prepaid Expenses

        Biaya dibayar dimuka merupakan biaya yang                       Prepaid expenses are in costs that have been
        telah dibayar namun pembebanannya baru                          paid but will be incurred future periods, such as
        akan dilakukan pada periode yang akan datang,                   prepaid insurance premiums, prepaid interest
        seperti premi asuransi dibayar dimuka, bunga                    and rent paid in advance. Prepaid expenses are
        dibayar dimuka, dan sewa dibayar dimuka.                        amortized over the periods of benefit using
        Biaya dibayar dimuka diamortisasi sesuai                        the straight-line method.
        dengan      masa      manfaatnya      dengan
        menggunakan metode garis lurus.

   n.   Persediaan                                                 n.   Inventories

        Persediaan dinyatakan berdasarkan jumlah                        Inventories are carried at the lower of cost and
        terendah antara biaya perolehan dan nilai                       net realizable value. The cost of inventories
        realisasi neto. Biaya perolehan terdiri dari                    comprises all costs incurred in bringing
        seluruh biaya lain yang timbul sampai                           the inventories to their present location and
        persediaan berada dalam kondisi dan lokasi                      condition. Cost is determined using first-in first-
        saat ini. Biaya perolehan ditentukan dengan                     out method (FIFO). Net realizable value is
        metode masuk pertama keluar pertama (FIFO).                     the estimated selling price in the ordinary course
        Nilai realisasi neto merupakan taksiran harga                   of business minus the estimated costs of
        jual dalam kegiatan usaha biasa dikurangi                       completion and the estimated costs necessary
        estimasi biaya penyelesaian dan estimasi biaya                  to make the sale.The cost of precast inventories
        yang diperlukan untuk membuat penjualan.                        comprises of cost of purchases, cost of
        Biaya persediaan produk pracetak terdiri dari                   conversion, direct labor and attributable
        seluruh biaya pembelian, biaya konversi, tenaga                 production overheads based on normal levels of
        kerja langsung, dan biaya overhead produksi                     activity.
        berdasarkan tingkat aktivitas normal.

        Sejak tahun 2021, Grup menggunakan teknik                       Since 2021, the Group has used the technique
        pengukuran biaya persediaan dengan metode                       of measuring inventory costs using the standard
        biaya standar. Beban varians dari biaya standar                 cost method. The variance load from standard
        merupakan evaluasi atas jumlah normal atau                      costs is an evaluation of the normal or abnormal
        tidak normal atas biaya produksi. Selanjutnya                   amount in production costs. Furthermore,
        beban varians dari persediaan dikeluarkan dari                  variance expenses from inventories which are
        beban persediaan dan diakui sebagai beban                       excluded from inventory expenses and
        lainnya dalam periode terjadinya meliputi:                      recognized as other expenses in the period in
                                                                        which they occur include:

        a.   Jumlah yang tidak normal atas bahan,                       a.   Abnormal amounts of materials, labor or
             tenaga kerja atau biaya produksi lainnya                        other production costs (non contributing
             (non contributing plant).                                       plant).
                                                          - 42 -
Page 46
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

        b.   Biaya penyimpanan kecuali biaya tersebut                   b.   Storage costs unless these costs are
             diperlukan dalam proses produksi sebelum                        needed in the production process before
             dilanjutkan pada tahap produksi selanjutnya.                    proceeding to the next stage of production
             (Beban Umum dan Administrasi).                                  (General and Administrative Expenses).
        c.   Biaya administrasi dan umum yang tidak                     c.   General and administrative expenses that
             memberikan konstribusi untuk membuat                            do not contribute to keeping the inventory in
             persediaan berada dalam kondisi dan lokasi                      its current state and location (General and
             saat ini (Beban Umum dan Administrasi).                         Administrative Expenses).
        d.   Biaya penjualan (Beban Penjualan).                         d.   Sales cost (Sales Expense).

        Persediaan tanah kavling untuk usaha sarana                     Inventory of plots of land for housing facilities
        perumahan dinilai dengan menggunakan harga                      business are assessed using the acquisition
        beli ditambah dengan biaya lain-lain yang                       cost plus other expenditures incurred to make
        dikeluarkan sampai dengan tanah tersebut siap                   the land ready for sale (with certificate).
        dijual (bersertifikat).
        Persediaan material dinyatakan sebesar nilai                    Material inventories and precast inventories are
        yang lebih rendah antara harga perolehan                        stated at the lower of the cost or net realizable
        dengan nilai realisasi bersih dan persediaan                    value.
        precast pun menggunakan metode yang sama.
        Penyisihan penurunan nilai persediaan diakui                    Allowance for decline in value of inventories is
        berdasarkan kondisi fisik persediaan dan                        recognized based on physical conditions of
        persediaan yang bergerak lambat dengan                          the inventories and slow-moving inventories
        mempertimbangkan manfaat masa depan dan                         taking into account future benefits and net
        nilai realisasi bersih.                                         realizable value.
   o.   Aset Tetap                                                   o. Fixed Assets
        Aset tetap dipertanggungjawabkan dengan                         Fixed assets are accounted for using cost model
        menggunakan model biaya dan dinyatakan                          and is stated based on acquisition cost minus
        berdasarkan biaya perolehan setelah dikurangi                   the accumulated depreciation and accumulated
        akumulasi penyusutan. Aset tetap, kecuali                       impairment losses, if any. Fixed assets, except
        tanah, disusutkan dengan metode saldo                           for land, are depreciated using the double-
        menurun ganda dan garis lurus (untuk gedung                     declining method and straight-line method (for
        dan bangunan).                                                  plants and buildings).

        Aset tetap tanah dan bangunan dinyatakan                        Land and buildings are stated at their revalued
        berdasarkan nilai revaluasi yang merupakan                      amounts, being the fair value at the date of
        nilai wajar pada tanggal revaluasi dikurangi                    revaluation, less any subsequent accumulated
        akumulasi penyusutan dan akumulasi rugi                         depreciation and subsequent accumulated
        penurunan nilai yang terjadi setelah tanggal                    impairment losses. Revaluation is made with
        revaluasi.   Revaluasi   dilakukan     dengan                   sufficient regularity to ensure that the carrying
        keteraturan yang memadai untuk memastikan                       amount does not differ materially from
        bahwa jumlah tercatat tidak berbeda secara                      the amount determined using fair value at
        material dari jumlah yang ditentukan dengan                     the reporting date.
        menggunakan nilai wajar pada tanggal laporan.
        Kenaikan yang berasal dari revaluasi tanah dan                  Any     revaluation     increase     arising      on
        bangunan        diakui    pada      penghasilan                 the revaluation of such land and buildings is
        komprehensif lain dan terakumulasi dalam                        recognized in other comprehensive income and
        ekuitas pada bagian surplus revaluasi, kecuali                  accumulated in equity under revaluation surplus,
        sebelumnya penurunan revaluasi atas aset                        except to the extent that it reverses a
        yang sama pernah diakui dalam laba rugi,                        revaluation decrease, for the same asset which
        dalam hal ini kenaikan revaluasi hingga sebesar                 was previously recognized in profit or loss, in
        penurunan nilai aset akibat revaluasi tersebut,                 this case the increase is credited to profit or loss
        dikreditkan dalam laba rugi. Penurunan jumlah                   to the extent of the decrease previously
        tercatat yang berasal dari revaluasi tanah dan                  charged. A decrease in carrying amount arising
        bangunan dibebankan dalam laba rugi apabila                     on the revaluation of such land and buildings is
        penurunan tersebut melebihi saldo surplus                       charged to profit or loss to the extent that it
        revaluasi aset yang bersangkutan, jika ada.                     exceeds the balance, if any.
        Surplus revaluasi tanah dan bangunan yang                       Any    revaluation   increase    arising    on
        telah diajukan dalam ekuitas dipindahkan                        The land and building revaluation surplus that

                                                            - 43 -
Page 47
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

       langsung ke saldo laba pada saat aset tersebut                   has been submitted to equity is transferred
       dihentikan pengakuannya.                                         directly to retained earnings when the asset is
                                                                        derecognised.
       Jika aset revaluasi tidak mengalami perubahan                    If the revalued asset does not experience a
       nilai wajar secara signifikan, aset tersebut                     significant change in fair value, the asset is
       direvaluasi paling kurang setiap 3 (tiga) tahun.                 revalued at least every 3 (three) years
       Aset tetap tanah tidak disusutkan. Sedangkan                     Fixed asset lands are not depreciated. While
       aset tetap gedung disusutkan dengan metode                       building   assets     are    depreciated using
       garis lurus selama masa manfaat aset tersebut,                   the straight line method based on their
       sebagai berikut:                                                 estimated useful lives, as follows:
                                                           Masa Manfaat/
                                                           Useful Lives

          Gedung dan Pabrik                                20 Tahun/ Year                                  Buildings and Plant

       Aset tetap kecuali tanah dan bangunan                            Fixed assets except for land and buildings are
       dinyatakan berdasarkan biaya perolehan                           stated for using cost less accumulated
       dikurangi akumulasi penyusutan, dan akumulasi                    depreciation and accumulated impairment
       penurunan nilai jika ada, dan disusutkan dengan                  losses, if there is any, and depreciated using
       menggunakan metode saldo menurun berganda                        the double declining method based on
       selama taksiran masa manfaat ekonomis aset                       the estimated useful life of the fixed assets as
       tetap sebagai berikut:                                           follows:
                                                           Masa Manfaat/
                                                           Useful Lives

          Kendaraan                                         8 Tahun/ Year                                             Vehicles
          Perlengkapan Kantor                             2 - 8 Tahun/ Year                                    Office Supplies
          Peralatan Proyek                                4 - 16 Tahun/ Year                                Project Equipment

       Beban pemeliharaan dan perbaikan dibebankan                      The cost of maintenance and repairs is charged
       pada laporan laba rugi pada saat terjadinya.                     to profit or loss as incurred. Other costs incurred
       Biaya- biaya lain yang terjadi selanjutnya yang                  subsequently to add to, replace part of, or
       timbul untuk menambah, mengganti atau                            service an item of property, plant and
       memperbaiki aset tetap dicatat sebagai biaya                     equipment, are recognized as asset if, and only
       perolehan aset jika dan hanya jika besar                         if it is probable that future economic benefits
       kemungkinan manfaat ekonomis di masa depan                       associated with the item will flow to the entity
       berkenaan dengan aset tersebut akan mengalir                     and the cost of the item can be measured
       ke entitas dan biaya perolehan aset dapat                        reliably.
       diukur secara andal.
       Jumlah     tercatat   aset   tetap  dihentikan                   The carrying amount of fixed assets is
       pengakuannya pada saat dilepaskan atau saat                      derecognized upon disposal or when no future
       tidak ada manfaat ekonomis masa depan yang                       economic benefits are expected from its use or
       diharapkan       dari     penggunaan      atau                   disposal. Any profit or loss arising on
       pelepasannya. Laba atau rugi yang timbul dari                    derecognition of the asset (calculated as
       penghentian pengakuan aset (dihitung sebagai                     the difference between the net disposal
       perbedaan antara jumlah neto hasil pelepasan                     proceeds and the carrying amount of the asset)
       dan jumlah tercatat dari aset) dimasukkan                        is included  in the profit or loss for the period
       dalam laba rugi pada periode aset tersebut                       when the assets are derecognized.
       dihentikan pengakuannya.

       Pada akhir periode/ tahun buku pelaporan, Grup                   At the end of reporting period the Group
       melakukan penelaahan berkala atas masa                           periodically reviews the useful lives of
       manfaat ekonomis aset, nilai residu, metode                      the assets, asset’s residual value, depreciation
       penyusutan, dan sisa umur pemakaian                              method and the remaining usage expectation
       berdasarkan spesifikasi teknis.                                  based on technical specification.
       Aset dalam penyelesaian dinyatakan sebesar                       Construction in progress is stated at cost and
       biaya perolehan, dan akan dipindahkan ke aset                    will be reclassified to the respective fixed assets
       tetap     pada     saat     sudah     selesai                    when completed and ready to use.
       pembangunannya dan siap digunakan.

                                                          - 44 -
Page 48
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

   p.   Properti Investasi                                            p. Investment Properties
        Properti investasi adalah properti (tanah atau                   Investment properties are properties (land or a
        bangunan atau bagian dari suatu bangunan                         building or part of a building or both) held by
        atau kedua-duanya) yang dikuasai oleh pemilik                    the owner or the lessee under a finance lease to
        atau penyewa melalui sewa pembiayaan untuk                       earn rentals or for capital appreciation or both,
        menghasilkan sewa atau untuk kenaikan nilai                      rather than for use in the production or supply of
        atau kedua-duanya, dan tidak untuk digunakan                     goods or services or for administrative
        dalam produksi atau penyediaan barang atau                       purposes; or sale in daily business activities.
        jasa atau untuk tujuan administratif; atau dijual
        dalam kegiatan usaha sehari-hari.
        Properti investasi diakui sebagai aset jika dan                  Investment property is recognized as an asset
        hanya jika besar kemungkinan manfaat ekonomi                     when, and only when it is probable that
        masa depan yang terkait dengan properti                          the future economic benefits that are associated
        investasi akan mengalir ke entitas; dan biaya                    with the investment property will flow to
        perolehan properti investasi dapat diukur                        the entity; and the cost of the investment
        dengan andal.                                                    property can be measured reliably.
        Properti investasi pada awalnya diukur sebesar                   An investment property shall be measured
        biaya perolehan, meliputi harga harga                            initially at its cost, which comprises its purchase
        pembelian dan setiap pengeluaran yang dapat                      price and any directly attributable expenditure
        diatribusikan secara langsung (biaya jasa                        (professional fees for legal services, property
        hukum, pajak pengalihan properti dan biaya                       transfer taxes and other transaction costs).
        transaksi lain). Biaya transaksi termasuk dalam                  Transaction costs are included in the initial
        pengukuran awal tersebut.                                        measurement.
        Setelah pengakuan awal, Grup memilih                             After initial recognition, the Group chooses to
        menggunakan model nilai wajar dan mengukur                       use fair value model and measure all of its
        seluruh properti investasi berdasarkan nilai                     investment property at fair value. A gain or loss
        wajar. Keuntungan atau kerugian yang timbul                      arising from a change in the fair value of
        dari perubahan nilai wajar properti investasi                    investment property is recognized in profit or
        diakui dalam laba rugi pada periode terjadinya.                  loss for the period in which it arises.
        Penentuan nilai wajar investasi didasarkan pada                  The fair value of investment property is based
        penilaian oleh penilai independen yang                           on a valuation by an independent appraiser who
        mempunyai kualifikasi profesional yang telah                     holds a recognized and relevant professional
        diakui dan relevan serta memiliki pengalaman                     qualification and has recent experience in
        terkini di lokasi dan kategori properti investasi                the location and category of the investment
        yang dinilai.                                                    property being valued.
        Pengalihan ke properti investasi dilakukan, jika                 The transfer to investment property is made, if
        dan    hanya    jika,    terdapat    perubahan                   and only if, there is a change in use, evidenced
        penggunaan     yang      ditunjukkan    dengan                   by the end of owner-occupation and
        berakhirnya pemakaian oleh pemilik dan                           commencement of an operating lease to
        dimulainya sewa operasi kepada pihak lain.                       another party.

        Pengalihan dari properti investasi dilakukan, jika               The transfer from investment property is made,
        dan    hanya     jika,    terdapat     perubahan                 if and only if, there is a change in use,
        penggunaan      yang      ditunjukkan     dengan                 evidenced by the commencement of owner-
        dimulainya penggunaan oleh pemilik dan                           occupation and commencement of development
        dimulainya pengembangan untuk dijual.                            with a view to sell.

        Properti investasi dihentikan pengakuannya                       An investment property is derecognized on
        pada saat dilepaskan atau ketika tidak                           disposal or when the investment property is
        digunakan lagi secara permanen dan tidak                         permanently withdrawn from use and no future
        memiliki manfaat ekonomi masa depan yang                         economic benefits are expected from its
        diperkirakan dari pelepasannya. Keuntungan                       disposal. Gains or losses arising from
        atau kerugian yang timbul dari penghentian atau                  the retirement or disposal are determined as
        pelepasan ditentukan dari selisih antara hasil                   the difference between the net disposal
        neto pelepasan dan jumlah tercatat aset, dan                     proceeds and the carrying amount of the asset,
        diakui dalam laba rugi pada periode terjadinya                   and are recognized in profit or loss in the period
        penghentian atau pelepasan.                                      of the retirement or disposal.


                                                             - 45 -
Page 49
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

   q.   Aset Lain-lain                                               q. Other Assets
        Akun-akun yang tidak dapat digolongkan dalam                      Accounts that cannot be classified into current
        aset lancar, investasi, maupun aset tidak                         assets, investment, or intangible assets are
        berwujud disajikan dalam aset lain-lain.                          presented as other assets.
        Beban tangguhan berupa hak atas tanah dicatat                     Deferred expense such as land right is recorded
        sebesar biaya perolehan hak atau biaya                            at cost of acquisition or cost of renewal right. All
        pembaharuan hak. Semua beban tangguhan                            deferred expense of right is amortized over
        terkait hak diamortisasi sepanjang umur hukum                     useful life or economic life of land, whichever is
        hak atau umur ekonomis aset tanah, yang mana                      shorter.
        yang lebih pendek.

   r.   Perjanjian Konsesi Jasa                                      r.   Service Concession Arrangement
        Grup telah menerapkan ISAK 112, “Perjanjian                       The Group has adopted ISAK 112, “Service
        Konsesi Jasa” (ISAK 112) dan ISAK 229,                            Concession Arrangement” (ISAK 112) and ISAK
        “Perjanjian Konsesi Jasa Pengungkapan”                            229,   “Service    Concession  Arrangement:
        (ISAK 229).                                                       Disclosure” (ISAK 229).
        ISAK 112 mengatur prinsip umum dalam                              ISAK 112 determines the general principles in
        pengakuan dan pengukuran hak dan kewajiban                        the recognition and measurement of rights and
        terkait dengan perjanjian konsesi jasa. ISAK                      liabilities related to service concession
        112 mengatur bahwa infrastruktur tidak diakui                     arrangement. ISAK 112 regulates that an
        sebagai aset tetap operator (pihak penerima                       operator (concession right beneficiary) does not
        konsesi jasa) karena perjanjian jasa kontraktual                  recognize any infrastructure assets because
        tidak memberikan hak kepada operator untuk                        the contractual service arrangement does not
        mengendalikan penggunaan infrastruktur jasa                       convey the right to control the use of the public
        publik. Operator memiliki akses untuk                             service     infrastructure    to   the    operator.
        mengoperasikan        infrastruktur       dalam                   The operator has access to operate
        menyediakan jasa publik untuk kepentingan                         the infrastructure to provide public service on
        pemberi konsesi sesuai dengan persyaratan                         behalf of      the    grantor    in    accordance
        yang ditentukan dalam kontrak.                                    with the terms specified in the contract.
        ISAK 229 memberikan panduan spesifik                              ISAK 229 provides specific guidance for
        mengenai pengungkapan yang diperlukan atas                        the required disclosures regarding the service
        perjanjian konsesi jasa.                                          concession arrangement.
        Grup membukukan perjanjian konsesi jasa                           The Group accounts for its service concession
        sebagai model aset tak berwujud karena                            arrangement under the intangible asset model
        memiliki hak (lisensi) untuk membebankan                          as it receives the right (license) to charge users
        pengguna jasa publik. Pada saat pengakuan                         of public service. At initial recognition,
        awal, aset konsesi dicatat pada nilai wajar dari                  concession assets are recorded at the fair value
        imbalan yang diterima atau akan diterima. Aset                    of the benefit received or to be received. These
        konsesi ini adalah aset hak pengelolaan jalan tol                 concession assets are toll road concession
        yang akan diamortisasi selama sisa masa hak                       rights which will be amortized over the remaining
        konsesi sejak tanggal pengoperasian ruas jalan                    concession period from the date of operation of
        tol. Selama masa konstruksi, akumulasi biaya                      the toll road. During the construction period,
        perolehan dan konstruksi jalan tol diakui                         the accumulated toll road construction cost is
        sebagai aset konsesi dalam penyelesaian.                          recognized as concession assets in progress.
        Amortisasi mulai dibebankan pada saat aset                        The amortization of the cost         starts  when
        konsesi tersebut siap digunakan.                                  the concession assets are ready to be operated.
        Aset konsesi akan dihentikan pengakuannya                         The concession assets are derecognized at
        pada saat berakhirnya masa konsesi. Tidak                         the end of the concession period. There will be
        akan ada keuntungan atau kerugian saat                            no gain or loss upon derecognition as
        penghentian pengakuan karena aset konsesi                         the concession assets which are expected to be
        diharapkan telah diamortisasi secara penuh,                       fully amortized by then, will be handed over to
        akan diserahkan kepada Badan Pengatur Jalan                       the Badan Pengatur Jalan Tol (BPJT) with no
        Tol (BPJT) tanpa syarat.                                          consideration.
        Aset konsesi yang diberikan kepada Grup dapat                     Concession assets granted to the Group are
        dipindahkan dengan persetujuan Pemerintah/                        transferrable     with      approval     from
        BPJT. Aset konsesi ini akan diserahkan ke                         the Government/ BPJT. These concession right
        Pemerintah/ BPJT pada saat akhir masa                             assets will be transferred to the Government/

                                                            - 46 -
Page 50
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

       konsesi dan, pada saat itu, seluruh akun yang                   BPJT at the end of the concession period and,
       berhubungan dengan aset konsesi akan                            at that     time,    all  accounts related to
       dihentikan pengakuannya.                                        the concession rights assets will be
                                                                       derecognized.
       Selama periode hak pengusahaan jalan tol, aset                  During the toll road concession rights period,
       hak pengusahaan jalan tol dapat dikeluarkan                     the concession rights assets may be
       dari laporan posisi keuangan konsolidasian                      derecognized from the consolidated statement
       Grup jika jalan tol diserahkan (dikuasakan)                     of financial position of the Group if the toll road
       kepada pihak lain atau Pemerintah/ BPJT                         is    transferred     to    another     party    or
       mengubah status jalan tol menjadi jalan non-tol                 the Government/ BPJT changes the status of
       atau tidak ada manfaat ekonomi yang dapat                       the toll road to non-toll road or if there is no
       diharapkan dari penggunaannya. Keuntungan                       economic benefit expected from usage of
       atau kerugian yang timbul dari penghentian atau                 the toll road. Gain or loss from the
       pelepasan aset konsesi diakui sebagai                           discontinuance or disposal of concession assets
       keuntungan atau kerugian dalam laporan laba                     is recognized in the consolidated statement of
       rugi     konsolidasian     dan     penghasilan                  profit or loss and other consolidated
       komprehensif lain konsolidasian.                                comprehensive income.

       Selain itu, Grup mengakui dan mengukur                          In addition, the Group recognizes and measures
       pendapatan konstruksi sesuai dengan PSAK                        construction revenues in accordance with PSAK
       115 “Pendapatan dari Kontrak dengan                             115, “Revenue from Contracts with Customers”.
       Pelanggan”. Ketika Grup menyediakan jasa                        When the Group provides construction services
       konstruksi atau peningkatan kemampuan,                          or upgrades services, the consideration
       imbalan yang diterima atau akan diterima oleh                   received or to be received by the Group is
       Grup diakui pada nilai wajar.                                   recognized at its fair value.

       Kontrak konstruksi meliputi seluruh biaya                       Construction contract comprises all the amounts
       konstruksi pembangunan jalan tol atau                           of toll road construction costs or toll road
       peningkatan kapasitas jalan tol yang meliputi                   capacity improvement consisting of land
       pengadaan tanah, studi kelayakan dan biaya-                     acquisition cost, feasibility study cost and other
       biaya lain yang berhubungan langsung dengan                     costs that are directly attributable to the toll road
       pembangunan jalan tol, termasuk biaya                           construction, including construction costs for
       pembangunan jalan akses ke jalan tol, jalan                     access roads, alternative roads and required
       alternatif dan fasilitas jalan umum yang                        public road facilities, interest and other
       disyaratkan, ditambah biaya pinjaman lain yang                  borrowing costs, either directly or indirectly used
       secara langsung maupun tidak langsung                           for financing the development of assets. These
       digunakan       untuk      mendanai     proses                  costs are capitalized until the construction is
       pembangunan aset tersebut. Biaya pinjaman                       completed and the concession assets are ready
       dikapitalisasi sampai dengan saat proses                        to be operated.
       pembangunan tersebut telah selesai dan aset
       konsesi telah siap untuk dioperasikan.

       Grup mengakui biaya jasa konstruksi dan                         The Group recognizes construction services and
       peningkatan kemampuan aset konsesi sebagai                      increased capacity of concession asset as
       aset tak berwujud dimana Grup menerima hak                      intangible assets in which the Group receives
       (lisensi) untuk membebankan pengguna jasa                       the rights (license) to charge users of public
       publik. Suatu hak untuk membebankan                             services. A right to charge users of public
       pengguna jasa publik bukan merupakan hak                        services is not an unconditional right to receive
       tanpa syarat untuk menerima kas karena                          cash because the amounts depend on
       jumlahnya bergantung pada sejauh mana publik                    the extent of the public using the service. During
       menggunakan jasa. Selama periode konstruksi,                    the construction period, the Group records
       Grup mencatat aset tak berwujud dan mengakui                    intangible assets, and recognizes revenues and
       pendapatan dan biaya konstruksi sesuai dengan                   costs of construction in accordance to
       kontraknya. Biaya konstruksi merupakan nilai                    the contract. Construction cost is the value of
       dari jumlah perolehan kontrak konstruksi.                       acquisition of a construction contract.

       Biaya bunga dan biaya pinjaman lainnya,                         Interests and other borrowing costs, such as
       seperti diskonto baik yang secara langsung                      discount fees on loans either directly or
       ataupun tidak langsung digunakan untuk                          indirectly used in financing the construction of a
       mendanai      proses      pembangunan       aset                qualifying asset, are capitalized up to the date
       kualifikasian (qualifying assets), dikapitalisasi               when the construction is completed. For
       sampai saat proses pembangunannya selesai.                      borrowings directly attributable to a qualifying

                                                           - 47 -
Page 51
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

        Untuk pinjaman yang dapat dihubungkan secara                      asset, the amount allowed to be capitalized is
        langsung dengan suatu aset tertentu, jumlah                       determined as the actual borrowing costs
        yang dapat dikapitalisasi adalah sebesar biaya                    incurred during the period, less any investment
        pinjaman yang terjadi dalam periode berjalan,                     income earned from the temporary investment
        dikurangi   dengan     penghasilan    investasi                   of such borrowings.
        sementara dari pinjaman tersebut.

        Provisi Pelapisan Jalan Tol                                       Provision for Toll Road Overlay
        Dalam      pengoperasian       jalan  tol, Grup                   In operating toll roads, the Group is obligated to
        mempunyai kewajiban untuk menjaga kualitas                        maintain quality in accordance with the SPM
        sesuai dengan Standar Pelayanan Minimum                           (Minimum Service Standards) established by
        (SPM) yang ditetapkan oleh Kementerian                            the Ministry of Public Works of the Republic of
        Pekerjaan Umum Republik Indonesia, yaitu                          Indonesia, i.e., by perfoming toll road overlay
        antara lain dengan melakukan pelapisan ulang                      regularly. The cost of this overlay is periodically
        jalan tol secara berkala. Biaya pelapisan ini                     provided based on estimated utilization of toll
        akan dicadangkan secara berkala berdasarkan                       road by customers. The estimated net provision
        estimasi penggunaan jalan tol oleh pelanggan.                     for toll road overlay is discounted to its present
        Provisi pelapisan ulang jalan tol diukur dengan                   value that reflects management estimates
        nilai kini atas estimasi manajemen terhadap                       against cost incurred to settle current provision.
        pengeluaran      yang        diperlukan    untuk
        menyelesaikan liabilitas kini.
        Aset jalan tol terdiri dari jalan dan jembatan,                   Toll road assets consisting of roads and bridges,
        gerbang dan bangunan pelengkap jalan tol dan                      gates and complementary building toll roads
        sarana pelengkap jalan tol dicatat sebagai aset                   and toll supplementary facilities are recorded as
        hak pengusahaan jalan tol yang dinyatakan                         toll road concession rights which are stated at
        sebesar nilai wajar pada tanggal revaluasian                      fair value at the revaluation date less
        dikurangi akumulasi penyusutan dan akumulasi                      accumulated depreciation and accumulated
        rugi penurunan nilai yang terjadi setelah tanggal                 impairment losses that occur after the date of
        revaluasi.                                                        revaluation.
        Amortisasi aset jalan dan jembatan dilakukan                      Amortization of asset roads and bridges is
        dengan menggunakan metode unit produksi                           calculated using the unit of production
        (jumlah lalu lintas kendaraan kendaraan)                          (the amount of vehicle traffic vehicles) during
        selama masa hak pengusahaan jalan tol (masa                       the period of the concession (concession
        konsesi). Sedangkan aset hak pengusahaan                          period). While the toll road concession rights
        jalan tol selain jalan dan jembatan diamortisasi                  assets other than roads and bridges are
        selama periode yang lebih pendek antara masa                      amortized over the shorter period between the
        hak pengusahaan jalan tol (masa konsesi) dan                      period of concession (concession period) and
        umur manfaat aset.                                                the useful life of the asset.
        Aset tak berwujud dihentikan pengakuannya jika                    Intangible assets are derecognized when
        dilepas atau ketika tidak terdapat lagi manfaat                   removed or when there are no further future
        ekonomi masa depan yang diperkirakan dari                         economic benefits are expected from its use or
        penggunaannya          atau       pelepasannya.                   disposal. Gains or losses arising from
        Keuntungan atau kerugian yang muncul dari                         derecognition of an intangible asset is
        penghentian pengakuan aset tak berwujud                           determined as the difference between the net
        ditentukan sebagai selisih antara hasil neto                      disposal proceeds (if any) and the carrying
        pelepasan (jika ada) dan jumlah tercatat aset.                    amount of assets. Gains or losses are
        Keuntungan atau kerugian diakui dalam laba                        recognized in profit or loss when the asset is
        rugi    ketika   aset     tersebut    dihentikan                  derecognized. Gains or loses are recognized as
        pengakuannya. Keuntungan atau kerugian                            other income.
        diakui sebagai pendapatan lain-lain.

   s.   Penurunan     Aset    Non-Keuangan       kecuali             s.   Impairment of Non-Financial Assets except
        Goodwill                                                          Goodwill
        Kebijakan akuntansi untuk penurunan nilai aset                    The accounting policy for impairment of financial
        keuangan dijelaskan dalam catatan 3h;                             assets is discussed in note 3h; while impairment
        penurunan nilai untuk goodwill dijelaskan dalam                   for goodwill is discussed in note 3d.
        catatan 3d.



                                                            - 48 -
Page 52
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   t.   Aset Keuangan dari Perjanjian Jasa Konsesi                 t.   Financial Asset from Service Concession
                                                                        Arraignment

        WSE menerapkan ISAK 112 “Perjanjian                             WSE applies ISAK 112 “Service Concession
        Konsesi Jasa” atas Perjanjian Jual Beli Listrik                 Arrangements” on its Power Purchase
        (Power Purchase Agreement - PPA) dengan PT                      Agreement (PPA) with PT Perusahaan Listrik
        Perusahaan Listrik Negara (Persero) (PLN).                      Negara (Persero) (PLN).

        Perjanjian konsesi jasa adalah perjanjian                       Service      concession       arrangements     are
        dimana pemerintah atau badan lainnya                            arrangements whereby a government or another
        (pemberi konsesi) memberikan kontrak untuk                      body (the “grantor”) grants contracts for
        penyediaan layanan publik ke entitas sektor                     the supply of public services to a private sector
        swasta (“operator”). Perjanjian tersebut sering                 entity (the “operator”). This is often referred to
        disebut sebagai perjanjian 'publik-ke-swasta'.                  as a 'public-to-private' arrangement.

        Dalam perjanjian ini, operator membangun                        In this type of arrangement, an operator
        infrastruktur yang akan digunakan untuk                         constructs the infrastructure that will be used to
        menyediakan jasa publik dan mengoperasikan                      provide the public service and operates and
        serta mengelola infrastruktur tersebut untuk                    maintains that infrastructure for a specified
        jangka waktu tertentu. Operator dibayar untuk                   period of time. The operator is paid
        jasa yang dibayarkan selama periode perjanjian.                 for the services over the period of
        Perjanjian diatur oleh suatu kontrak yang                       the arrangement. A contract sets out
        menetapkan standar kinerja, mekanisme                           performance standards, pricing mechanisms,
        penyesuaian harga, dan pengaturan untuk                         and arrangements for arbitrating disputes. In
        menengahi perselisihan. Dalam beberapa kasus,                   some cases, the operator may upgrade
        operator dapat meningkatkan infrastruktur yang                  the existing infrastructure.
        ada.

        Beberapa ciri umum dari perjanjian konsesi jasa                 Some common features of service concession
        meliputi:                                                       arrangements include:

        •   Pemberi konsesi merupakan entitas sektor                    •   The grantor is a public sector entity,
            publik, termasuk badan pemerintah, atau                         including a governmental body, or a private
            entitas sektor swasta yang telah diberikan                      sector entity to which the responsibility for
            tanggung jawab atas layanan tersebut.                           the service has been devolved.
        •   Operator bertanggung jawab setidaknya                       •   The operator is responsible for at least
            atas sebagian pengelolaan infrastruktur dan                     some       of     the      management      of
            jasa terkait dan tidak hanya bertindak                          the infrastructure and related services and
            sebagai agen atas kepentingan pemberi                           does not merely act as an agent on behalf
            konsesi.                                                        of the grantor.
        •   Kontrak menetapkan harga awal yang akan                     •   The contract sets the initial prices to be
            dikenakan oleh operator dan mengatur                            levied by the operator and regulates price
            perubahan harga selama periode perjanjian                       revisions over the period of the service
            jasa.                                                           arrangement.
        •   Operator diwajibkan untuk menyerahkan                       •   The operator is obligated to hand over
            infrastruktur kepada pemberi konsesi pada                       the infrastructure to the grantor in a
            akhir periode perjanjian dalam kondisi yang                     specified condition at the end of the period
            telah ditentukan, dengan sedikit atau tanpa                     of the arrangement, for little or no
            imbalan tambahan, terlepas dari pihak yang                      incremental consideration irrespective of
            awalnya mendanai infrastruktur.                                 which party initially financed it.
        PPA yang diungkapkan pada Catatan 61 antara                     PPA disclosed in Note 61 between PLN and
        PLN dan WSE memenuhi definisi sebagai                           WSE meets the definition of a service
        perjanjian konsesi jasa dimana PLN bertindak                    concession arrangement, where PLN acts as a
        sebagai pemberi konsesi dan WSE bertindak                       grantor and WSE acts as the operator. WSE
        sebagai     operator.   WSE      setuju  untuk                  agrees to design, finance, construct, own and
        merancang, membiayai, membangun, memiliki                       operate a mini hydro power generating facility
        dan mengoperasikan fasilitas pembangkit listrik                 (the “infrastructure”) and sell to PLN the power
        tenaga mini hidro (“infrastruktur”) dan menjual                 generated therefrom on terms and conditions as
        kepada PLN energi yang dihasilkan darinya                       agreed in the PPA. The infrastructure is used for
        dengan syarat dan kondisi sebagaimana                           its entire useful life for the purpose of
        disepakati dalam PPA. Infrastruktur digunakan                   the service concession arrangement.
        untuk seluruh masa manfaatnya untuk tujuan
        pengaturan layanan konsesi.
                                                          - 49 -
Page 53
PT WASKITA KARYA (PERSERO) Tbk                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                   (Expressed in Rupiah, unless otherwise stated)


        Dalam ISAK 112 mengatur prinsip umum dalam                     Under ISAK 112 determines the general
        pengakuan hak dan kewajiban terkait dengan                     principles in the recognition and measurement
        konsesi jasa, WSE tidak mengakui infrastruktur                 of liabilities and rights related to service
        sebagai aset tetap namun mengakui sebagai                      concession,     WSE      does not      recognize
        aset keuangan, karena WSE memiliki hak tanpa                   the infrastructure as property and equipment but
        syarat untuk menerima kas dari PLN melalui                     recognizes it as a financial asset, as WSE has
        pembayaran kapasitas berdasarkan PPA. Aset                     an unconditional right to receive cash from PLN
        keuangan dicatat sebagai “pinjaman yang                        through the capacity payments under the PPA.
        diberikan dan piutang” sesuai dengan PSAK                      The financial asset is accounted as a “loans and
        109, “Instrumen Keuangan”.                                     receivables” in accordance to PSAK 109,
                                                                       “Financial Instruments”.

        ISAK 229 memberikan panduan spesifik                           ISAK 229 provides specific guidance for
        mengenai pengungkapan yang diperlukan atas                     the required disclosures regarding the service
        perjanjian konsesi jasa.                                       concession agreement.

        WSE menghitung pendapatan yang terkait                         WSE accounts for revenue relating to operation
        dengan jasa operasi sesuai dengan PSAK 115,                    services in accordance with PSAK 115,
        “Pendapatan dari Kontrak dengan Pelanggan”.                    “Revenue from Contracts with Customer”. WSE
        WSE mencatat kewajiban kontraktual untuk                       accounts for the contractual obligations to
        memelihara atau mengembalikan infrastruktur di                 maintain or restore the infrastructure in the plant
        lokasi operasi sesuai dengan PSAK 237,                         operations in accordance to PSAK 237,
        Provisi, Kewajiban Kontinjensi dan Aktiva                      Provisions, Contingent Liabilities and Contingent
        Kontinjensi.                                                   Assets.

   u.   Utang Bruto kepada Subkontraktor                          u. Gross Amount Due to Subcontractors

        Utang bruto kepada subkontraktor diakui atas                   Gross amount due to subcontractors is
        dasar akrual yang merupakan utang prestasi                     recognized on accrual basis which represents
        kerja       subkontraktor     yang      belum                  the      uncertified   subcontractor’s   working
        diberitaacarakan, baik dari subkontraktor atau                 progress, either from subcontractor or materials
        material yang diakui sebagai prestasi karena                   which are recognized as progress as it has not
        belum memenuhi syarat pembayaran sesuai                        fulfilled the certain payment condition as stated
        kontrak. Utang bruto kepada subkontraktor                      in the contract. Gross amount due to
        disajikan sebesar selisih antara biaya yang                    subcontractor is presented as the differences
        terjadi ditambah laba atau dikurangi kerugian                  between costs occurred added by income or
        yang diakui.                                                   deducted by realized loss.

   v.   Pengakuan Pendapatan dan Beban                            v.   Revenue and Expense Recognition

        PSAK 115 menentukan pengakuan pendapatan,                      PSAK 115 determines that the revenue is
        yaitu terjadi ketika pengendalian atas barang                  recognized when control of goods has been
        telah dialihkan atau pada saat (atau selama)                   transferred or when (or during) the rendering of
        jasa diberikan (kewajiban pelaksanaan telah                    services (performance obligation is satisfied).
        dipenuhi). Pendapatan usaha konstruksi yang                    Revenues from the construction business for
        telah diterbitkan Berita Acara Prestasi Proyek                 which the Minutes of Project Achievement have
        dan fakturnya diakui sebagai piutang usaha,                    been issued and invoices are recognized as
        sedangkan yang belum diterbitkan fakturnya                     trade receivables, while those whose invoices
        diakui sebagai tagihan bruto pemberi kerja.                    have not been issued are recognized as
        Pendapatan usaha yang belum diterbitkan                        employer gross invoices. Business income for
        faktur nya dan belum ada Berita Acara Prestasi                 which invoices have not been issued and there
        Proyek di akui sebagai pekerjaan dalam proses.                 is no Minutes of Project Achievement are
        Penerapan       standar   ini    mempengaruhi                  recognized      as    work      in     progress.
        pengakuan pendapatan pada bisnis properti                      The implementation of this standard affects
        pada WKR (Entitas Anak), yaitu pendapatan                      the recognition of revenue in the WKR’s
        diakui ketika unit properti diserahkan kepada                  (Subsidiary) property business, by which the
        pelanggan, dimana sebelumnya telah diakui                      revenue is recognized when the property unit is
        sesuai      dengan       metode     persentase                 handed-over to the customer, that previously
        penyelesaian.                                                  recognized based on the percentage of
                                                                       completion method.

        Dalam menentukan pengakuan pendapatan,                         In determining revenue recognition, the Group
        Grup melakukan analisa transaksi melalui                       performs     analysis   transaction    through

                                                         - 50 -
Page 54
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

       pendekatan lima langkah berikut:                                the following five steps of assessment:
       1.   Mengidentifikasi kontrak dengan pelanggan,                 1.   Identify contracts with customers        with
            dengan kriteria sebagai berikut:                                certain criteria as follows:
            -   Kontrak telah disetujui oleh pihak-pihak                    -   The contract has been agreed by
                terkait dalam kontrak                                           the parties involved in the contract
            -   Grup bisa mengidentifikasi hak dari                         -   The Group can identify the rights of
                pihak- pihak terkait dan jangka waktu                           relevant parties and the term of
                pembayaran dari barang atau jasa yang                           payment for the goods or services to be
                akan dialihkan                                                  transferred
            -   Kontrak memiliki substansi komersial                        -   The contract has commercial substance
            -   Besar kemungkinan entitas akan                              -   It is proable that the Group will receive
                menerima imbalan atas barang atau                               benefits for the goods or services
                jasa yang dialihkan                                             transferred
       2.   Mengidentifikasi kewajiban pelaksanaan                     2.   Identify the performance obligations in
            dalam kontrak, untuk menyerahkan barang                         the contract, to transfer distinctive goods or
            atau jasa yang memiliki karakteristik yang                      services to the customer.
            berbeda ke pelanggan.
       3.   Menentukan harga transaksi, setelah                        3.   Determine the transaction price, net of sales
            dikurangi potongan penjualan dan pajak                          discounts and value added tax, which an
            pertambahan nilai, yang berhak diperoleh                        entity expects to be entitled in exchange for
            suatu entitas sebagai kompensasi atas                           transferring promised goods or services to
            diserahkannya barang atau jasa yang                             customer.
            dijanjikan ke pelanggan.
       4.   Mengalokasikan harga transaksi kepada                      4.   Allocate the transaction price to each
            setiap kewajiban pelaksanaan dengan                             performance obligation on the basis of
            menggunakan dasar harga jual dari setiap                        the selling prices of each goods or services
            barang atau jasa yang dijanjikan di kontrak.                    promised in the contract.
       5.   Mengakui pendapatan ketika kewajiban                       5.   Recognize revenue when performance
            pelaksanaan telah dipenuhi yaitu dengan                         obligations is satisfied non distinct method
            metode sepanjang waktu atau dengan                              or distinct method.
            metode pada suatu waktu tertentu.
       Pembayaran harga transaksi berbeda untuk                        Payment of the transaction price differs for each
       setiap kontrak. Aset kontrak diakui apabila                     contracts. Contract asset is recognises when
       kewajiban pelaksanaan yang telah dipenuhi                       performance obligation satisfied is more than
       melebihi pembayaran yang dilakukan oleh                         the payments by customer. Contract liability is
       pelanggan. Liabilitas kontrak diakui ketika                     recognized when the payments by customer is
       pembayaran yang dilakukan oleh pelanggan                        more than the performance obligation satisfied.
       melebihi kewajiban pelaksanaan yang telah                       Contract assets are presented under gross
       dipenuhi. Aset kontrak disajikan dalam tagihan                  amounts due from customers, and contract
       bruto kepada pengguna jasa, dan liabilitas                      liabilities are presented under gross amount due
       kontrak disajikan dalam utang bruto kepada                      to subcontractors.
       subkontraktor.
       Kriteria tertentu juga harus terpenuhi untuk                    The specific criteria also must be met for each
       setiap aktivitas Grup seperti dijelaskan di                     of the Group’s activities as described below:
       bawah:
       -    Pendapatan dari jasa konstruksi diakui                     -    Revenue from construction services are
            dengan metode persentase penyelesaian                           recognized based on the percentage of
            berdasarkan kemajuan fisik proyek pada                          completion method, determined using
            tanggal pelaporan.                                              physical      progress of the projects at
                                                                            the reporting date.
       -    Pendapatan jasa operasi dan pemeliharaan                   -    Revenue relating to operation and
            atas perjanjian konsesi jasa diakui pada                        maintenance      service   under    service
            saat     pelanggan     menerima       dan                       concession arrangements is recognized
            mengonsumsi manfaat dari jasa tersebut.                         when the customer has received and
                                                                            consumed the benefit from the services.
       -    Pendapatan dari penjualan real estat diakui                -    Revenue from the sale of real estate is
            pada saat pengendalian atas real estat                          recognized when the control of real estate
            telah dialihkan kepada pelanggan.                               have been transferred to customers.
       -    Pendapatan dari penjualan beton pracetak,                  -    Revenue from the sale of precast, readymix

                                                           - 51 -
Page 55
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

           readymix dan baja diakui pada saat                                 and steel is recognized when the control of
           pengendalian atas barang telah berpindah                           goods     has     been    transferred    to
           kepada pelanggan.                                                  the customer.
        Beban diakui pada saat terjadinya, dengan                         Expenses are recognized as incurred on an
        menggunakan dasar akrual.                                         accruals basis.

   w. Sewa                                                           w. Leases

        Grup sebagai pihak penyewa mengakui aset                          Group as lessee recognized right-of-use assets
        hak- guna dan liabilitas sewa terkait dengan                      and leases liabilities related to leases, except for
        sewa, kecuali atas sewa jangka pendek atau                        short-term leases or leases with low value
        sewa dengan aset yang bernilai rendah.                            assets. These lease liabilities were measured at
        Liabilitas sewa diukur pada nilai kini dari sisa                  the present value of the remaining lease
        pembayaran sewa, yang didiskontokan dengan                        payments, discounted using the incremental
        menggunakan        suku    bunga       pinjaman                   borrowing rate. In determining incremental
        inkremental. Dalam menentukan suku bunga                          borrowing      rate,    the     Group     considers
        pinjaman inkremental, Grup mempertimbangkan                       the following main factors; the Goup’s corporate
        faktor-faktor utama berikut: risiko        kredit                 credit risk, the lease term, the lease payment
        korporat Grup, jangka waktu sewa, jangka                          term, the time at which the lease is entered into,
        waktu pembayaran sewa, waktu dimana sewa                          and the currency in which the lease payments
        dimasukkan,     dan    mata    uang      dimana                   are denominated.
        pembayaran sewa ditentukan.

        Grup mencatat sewa yang          diklasifikasikan                 The Company accounts for leases classified
        menjadi sebagai berikut:                                          became as follow:

        a.   Mencatat aset hak guna dan liabilitas sewa                   a.   Recognises right-of-use assets and lease
             dalam laporan posisi keuangan, yang diukur                        liabilities in the statement of financial
             pada nilai kini dari pembayaran sewa masa                         position, initially measured at the present
             depan;                                                            value of the future lease payments;
        b.   Mencatat penyusutan aset hak guna dan                        b.   Recognises depreciation of right-of-use
             bunga atas liabilitas sewa dalam laporan                          assets and interest on lease liabilities in
             laba rugi;                                                        profit or loss;
        c.   Memisahkan jumlah total pembayaran sewa                      c.   Separates the total amount of cash paid into
             ke bagian pokok dan bunga pada laporan                            a principal portion (presented within
             arus kas yang disajikan dalam aktivitas                           financing activities) and interest (presented
             pendanaan.                                                        within        financing     activities)     in
                                                                               the consolidated statement of cash flows.

   x.   Biaya Pinjaman                                               x.   Borrowing Costs

        Biaya pinjaman yang dapat diatribusikan                           Borrowing costs that are directly attributable to
        langsung dengan perolehan, pembangunan                            the acquisition, construction or production of a
        atau pembuatan aset kualifikasian, dikapitalisasi                 qualifying asset, are capitalized as part of
        sebagai bagian biaya perolehan aset tersebut.                     the cost of asset. Other borrowing costs are
        Biaya pinjaman lainnya diakui sebagai beban                       recognized as an expense when incurred.
        pada saat terjadi. Biaya pinjaman dapat                           Borrowing costs may include interest expense,
        mencakup beban bunga, beban keuangan                              finance charges in respect of finance leases, or
        dalam sewa pembiayaan atau selisih kurs yang                      exchange differences arising from foreign
        berasal dari pinjaman dalam mata uang asing                       currency borrowings to the extent that they are
        sepanjang selisih kurs tersebut diperlakukan                      regarded as an adjustment to interest costs.
        sebagai penyesuaian atas biaya bunga.

        Kapitalisasi biaya pinjaman dimulai pada saat                     Capitalization of borrowing costs commences
        Grup telah melakukan aktivitas yang diperlukan                    when the Group undertakes activities necessary
        untuk mempersiapkan aset agar dapat                               to prepare the asset for its intended use or sale
        digunakan atau dijual sesuai dengan intensinya                    and expenditures for the asset and its borrowing
        serta pengeluaran untuk aset dan biaya                            costs has been incurred. Capitalization of
        pinjamannya telah terjadi. Kapitalisasi biaya                     borrowing costs ceases when substantially all
        pinjaman dihentikan ketika secara substansial                     the activities necessary to prepare the qualifying
        seluruh aktivitas yang diperlukan untuk                           assets for its intended use or sale are complete.
        mempersiapkan aset kualifikasian agar dapat
        digunakan atau dijual sesuai dengan intensinya
        telah selesai.
                                                            - 52 -
Page 56
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)


        Konstruksi yang termasuk dalam perolehan aset                       Construction included in acquisition of certain
        tertentu adalah proyek-proyek pre-financing                         assets is the pre-financing projects whose
        yang pembangunannya membutuhkan waktu                               constructions time is required more than one
        lebih dari satu tahun.                                              year.
   y.   Pajak Penghasilan                                              y.   Income Taxes
        Beban pajak adalah jumlah gabungan pajak kini                       Tax expense is the aggregate amount included
        dan pajak tangguhan yang diperhitungkan                             in the determination of profit or loss for
        dalam menentukan laba rugi pada suatu                               the period in respect of the current tax and
        periode. Pajak kini dan pajak tangguhan diakui                      deferred tax. Current tax and deferred tax is
        dalam laba rugi, kecuali pajak penghasilan yang                     recognized in profit or loss, except for income
        timbul dari transaksi atau peristiwa yang diakui                    tax arising from transactions or events that are
        dalam penghasilan komprehensif lain atau                            recognized in other comprehensive income or
        secara langsung di ekuitas. Dalam hal ini, pajak                    directly in equity. In this case, the tax is
        tersebut     masing-masing      diakui    dalam                     recognized in other comprehensive income or
        penghasilan komprehensif lain atau ekuitas.                         equity, respectively.
        Beban pajak kini ditentukan berdasarkan laba                        Current tax expense is determined based on
        kena pajak dalam periode yang bersangkutan                          the taxable income for the year computed using
        yang dihitung berdasarkan tarif pajak yang                          prevailing tax rates.
        berlaku.
        Jumlah pajak kini untuk periode berjalan dan                        The amount of unpaid current tax for current
        periode sebelumnya yang belum dibayar diakui                        and prior periods is recognized as a liability.
        sebagai liabilitas. Jika jumlah pajak yang telah                    If the amount already paid in respect of current
        dibayar      untuk     periode     berjalan    dan                  and prior periods exceeds the amount due for
        periode-periode sebelumnya melebihi jumlah                          those periods, the excess shall be recognized
        pajak yang terutang untuk periode tersebut,                         as an asset. Current tax liabilities (assets) for
        maka kelebihannya diakui sebagai aset.                              the current and prior periods shall be measured
        Liabilitas (aset) pajak kini untuk periode berjalan                 at the amount expected to be paid to (recovered
        dan periode sebelumnya diukur sebesar jumlah                        from) the taxation authorities, using the tax rates
        yang diperkirakan akan dibayar kepada                               (and tax laws) that have been enacted or
        (direstitusi dari) otoritas perpajakan, yang                        substantively enacted by the end of the
        dihitung menggunakan tarif pajak (dan undang-                       reporting period.
        undang pajak) yang telah berlaku atau secara
        substantif telah berlaku pada akhir periode
        pelaporan.
        Manfaat terkait dengan rugi pajak yang dapat                        Tax benefits relating to tax loss that can be
        ditarik untuk memulihkan pajak kini dari periode                    carried forward to recover the current tax of
        sebelumnya diakui sebagai aset. Aset pajak                          previous periods is recognized as an asset.
        tangguhan diakui untuk akumulasi rugi pajak                         Deferred tax asset is recognized for
        belum dikompensasi dan kredit pajak belum                           the carryforward of unused tax losses and
        dimanfaatkan sepanjang kemungkinan besar                            unused tax credit to the extent that it is probable
        laba kena pajak masa depan akan tersedia                            that future taxable profit will be available against
        untuk dimanfaatkan dengan rugi pajak belum                          which the unused tax losses and unused tax
        dikompensasi     dan   kredit   pajak     belum                     credits can be utilized.
        dimanfaatkan.

        Seluruh perbedaan temporer kena pajak diakui                        A deferred tax liability shall be recognized for all
        sebagai liabilitas pajak tangguhan, kecuali                         taxable temporary differences, except to all
        perbedaan temporer kena pajak yang berasal                          taxable temporary differences arising from:
        dari:
        a)   Pengakuan awal goodwill; atau                                  a)   The intial recognition of goodwill; or
        b)   Pengakuan awal aset atau liabilitas dari                       b)   The initial recognition of an asset or liability
             transaksi yang bukan kombinasi bisnis dan                           in a transaction which is not a business
             pada saat transaksi tidak mempengaruhi                              combination and at the time of the
             laba akuntansi atau laba kena pajak (rugi                           transaction, does not affect neither
             pajak).                                                             accounting profit nor taxable profit (tax
                                                                                 loss).


                                                              - 53 -
Page 57
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)

       Aset pajak tangguhan diakui untuk seluruh                          A deferred tax asset shall be recognized for all
       perbedaan     temporer    dapat    dikurangkan                     deductible temporary differences to the extent
       sepanjang kemungkinan besar laba kena pajak                        that it is probable that taxable profit will be
       akan tersedia sehingga perbedaan temporer                          available against which the deductible
       dapat dimanfaatkan untuk mengurangi laba                           temporary difference can be utilized, unless
       dimaksud, kecuali jika aset pajak tangguhan                        the deferred tax asset arises from the initial
       timbul dari pengakuan awal aset atau                               recognition of an asset or liability in a
       pengakuan awal liabilitas dalam transaksi yang                     transaction that is not a business combination
       bukan kombinasi bisnis dan pada saat transaksi                     and at the time of the transaction does not affect
       tidak mempengaruhi laba akuntansi atau laba                        neither the accounting profit nor taxable profit
       kena pajak (rugi pajak).                                           (tax loss).
       Aset dan liabilitas pajak tangguhan diukur                         Deferred tax assets and liabilities are measured
       dengan menggunakan tarif pajak yang                                at the tax rates that are expected to apply when
       diharapkan berlaku ketika aset dipulihkan atau                     the asset is realized or the liability is settled,
       liabilitas diselesaikan, berdasarkan tarif pajak                   based on tax rates (and tax laws) that have
       (dan peraturan pajak) yang telah berlaku atau                      been enacted or substantively enacted by
       secara substantif telah berlaku pada akhir                         the       end      of    the     reporting  period.
       periode pelaporan. Pengukuran aset dan                             The measurement of deferred tax assets and
       liabilitas pajak tangguhan mencerminkan                            liabilities shall reflect the tax consequences that
       konsekuensi pajak yang sesuai dengan cara                          would follow from the manner in which
       Grup memperkirakan, pada akhir periode                             the Group expects, at the end of the reporting
       pelaporan,       untuk     memulihkan       atau                   period, to recover or settle the carrying amount
       menyelesaikan jumlah tercatat aset dan                             of its assets and liabilities.
       liabilitasnya.
       Jumlah tercatat aset pajak tangguhan ditelaah                      The carrying amount of a deferred tax asset is
       ulang pada akhir periode pelaporan. Grup                           reviewed at the end of each reporting period.
       mengurangi jumlah tercatat aset pajak                              The Group shall reduce the carrying amount of
       tangguhan jika kemungkinan besar laba kena                         a deferred tax asset if there is a high probability
       pajak tidak lagi tersedia dalam jumlah yang                        that sufficient taxable profit will no longer be
       memadai untuk mengkompensasikan sebagian                           available to allow the benefit of part or all of that
       atau seluruh aset pajak tangguhan tersebut.                        deferred tax asset to be utilised. Any such
       Setiap     pengurangan    tersebut  dilakukan                      reduction shall be reversed to the extent that
       pembalikan atas aset pajak tangguhan hingga                        it becomes probable that sufficient taxable profit
       kemungkinan besar laba kena pajak yang                             will be available.
       tersedia jumlahnya memadai.
       Grup melakukan saling hapus aset pajak                             The Group offsets deferred tax assets and
       tangguhan dan liabilitas pajak tangguhan jika                      deferred tax liabilities if, and only if:
       dan hanya jika:
       a)   Grup memiliki hak yang dapat dipaksakan                       a)   The Group has a legally enforceable right to
            secara hukum untuk melakukan saling                                offset deferred tax assets against deferred
            hapus aset pajak tangguhan terhadap                                tax liabilities; and
            liabilitas pajak tangguhan; dan
       b)   Aset pajak tangguhan dan liabilitas pajak                     b)   The deferred tax assets and liabilities are
            tangguhan     terkait   dengan      pajak                          related to the income taxes levied by
            penghasilan yang dikenakan oleh otoritas                           the same taxation authority on either:
            perpajakan yang sama atas:

            i. Entitas kena pajak yang sama; atau                              i. The same taxable entities; or
                6
            ii. Entitas kena pajak yang berbeda yang                           ii. Different taxable entities that are
                bermaksud untuk memulihkan aset dan                                intended to recover current tax assets
                liabilitas pajak kini dengan dasar neto,                           and liabilities with a net basis, or to
                atau       merealisasikan       aset    dan                        realize      the   assets   and     settle
                menyelesaikan         liabilitas     secara                        the liabilities simultaneously, in each
                bersamaan, pada setiap periode masa                                future period in which significant
                depan dimana jumlah signifikan atas                                amounts of deferred tax assets or
                aset atau liabilitas pajak tangguhan                               liabilities are expected to be settled or
                diperkirakan untuk diselesaikan atau                               recovered.
                dipulihkan.

                                                              - 54 -
Page 58
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

       Grup melakukan saling hapus atas aset pajak                       The Group offsets the current tax assets and
       kini dan liabilitas pajak kini jika dan hanya jika:               current tax liabilities if, and only if:
       a)   Memiliki hak yang dapat dipaksakan secara                    a)   Has legally enforceable rights to offset
            hukum untuk melakukan saling hapus atas                           the recognized amounts; and
            jumlah yang diakui; dan
       b)   Bermaksud untuk menyelesaikan dengan                         b)   Intends either to settle on a net basis, or to
            dasar neto atau merealisasikan aset dan                           realize the assets and settle liabilities
            menyelesaikan liabilitas secara bersamaan.                        simultaneously.
   aa. Sukuk                                                          aa. Sukuk
                                                                          a
       Sukuk adalah efek syariah berupa sertifikat atau                  Sukuk are sharia securities represented by a
       bukti kepemilikan yang bernilai sama dan                          certificate or evidence of ownership of equal
       mewakili bagian yang tidak tertentu (tidak                        denomination and representing individual
       terpisahkan atau tidak terbagi) atas: (a). aset                   ownership interest in (not separated or divided):
       berwujud tertentu; (b). manfaat atas aset                         (a). particular intangible assets; (b).existing or
       berwujud tertentu baik yang sudah ada maupun                      future benefits of particular intangible assets;
       yang akan ada; (c). jasa yang sudah ada                           (c).existing or future services; (d).particular
       maupun yang akan ada; (d). aset proyek                            project assets; or (e).determined investment
       tertentu; atau (e). kegiatan investasi yang telah                 activity.
       ditentukan.
       Sukuk mudharabah adalah sukuk                yang                 Sukuk mudharabah is          a   sukuk   using   a
       menggunakan akad mudharabah.                                      mudharabah’s contract.
       Sukuk mudharabah diakui saat Perusahaan                           Sukuk mudharabah is recognized when
       menjadi pihak yang terikat dengan ketentuan                       the Company becomes a party bound by
       penerbitan   sukuk    mudharabah.        Sukuk                    the provisions of sukuk mudharabah issuance.
       mudharabah diakui sebesar nilai nominal.                          Sukuk mudharabah is recognized at its nominal
                                                                         amount.
       Biaya transaksi diakui secara terpisah dari                       A transaction cost is recognized separately from
       sukuk mudharabah dan disajikan dalam aset                         sukuk mudarabah and is presented in assets as
       sebagai beban tangguhan, bukan sebagai pos                        deferred expense, rather than a contra account
       lawan dari sukuk mudharabah. Biaya transaksi                      of sukuk mudarabah. Transaction cost is
       diamortisasi secara garis lurus selama jangka                     amortized on straight- line basis over the terms
       waktu sukuk mudharabah.                                           of sukuk mudharabah.
   bb. Liabilitas imbalan kerja                                       bb. Employee Benefits Liabilities
       Imbalan Kerja Jangka Pendek                                       Short-Term Employee Benefits
       Imbalan kerja jangka pendek diakui ketika                         Short-term employee benefits are recognized
       pekerja telah memberikan jasanya dalam suatu                      when an employee has rendered service during
       periode akuntansi, sebesar jumlah tidak                           accounting period, at the undiscounted amount
       terdiskonto dari imbalan kerja jangka pendek                      of short-term employee benefits expected to be
       yang diharapkan akan dibayar sebagai imbalan                      paid in exchange for that service.
       atas jasa tersebut.
       Imbalan kerja jangka pendek mencakup antara                       Short-term employee benefits include such as
       lain upah, gaji, bonus dan insentif.                              wages, salaries, bonus and incentive.
       Imbalan Pasca Kerja                                               Post-Employment Benefits

       Imbalan pasca kerja seperti pensiun dan uang                      Post-employment benefits such as retirement,
       pisah dan uang penghargaan masa kerja                             severance and service payments are calculated
       dihitung     berdasarkan      Undang-Undang                       based on Labor Law No. 13/2003. In 2020
       Ketenagakerjaan No. 13/2003. Pada tahun 2020                      the Group has adjusted the calculation of post-
       Grup telah menyesuaikan perhitungan imbalan                       employment benefits based on the Job Creation
       pasca kerja berdasarkan Undang - Undang                           Law no. 11/2020 which is further regulated in
       Cipta Kerja No. 11/2020 yang diatur lebih lanjut                  Government Regulation (PP) no. 35 of 2021
       dalam Peraturan Pemerintah (PP) No. 35 tahun                      and/ or the Collective Labor Agreement (PKB).
       2021 dan/ atau Perjanjian Kerja Bersama
       (PKB).

                                                             - 55 -
Page 59
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)


       Grup mengakui jumlah liabilitas imbalan pasti                  The Group recognizes the amount of the net
       neto sebesar nilai kini kewajiban imbalan pasti                defined benefit liability at the present value of
       pada akhir periode pelaporan dikurangi nilai                   the defined benefit obligation at the end of
       wajar aset program yang dihitung oleh aktuaris                 the reporting period less fair value of plan
       independen dengan menggunakan metode                           assets which is calculated by independent
       Projected Unit Credit. Nilai kini kewajiban                    actuaries using the Projected Unit Credit
       imbalan      pasti       ditentukan     dengan                 method. Present value of the benefit obligation
       mendiskontokan imbalan tersebut.                               determined is by discounting the benefit.
       Grup mencatat tidak hanya kewajiban hukum                      The Group not only records its legal obligation
       berdasarkan persyaratan formal program                         under the formal terms of a defined benefit
       imbalan pasti, tetapi juga kewajiban konstruktif               obligation, but also for any constructive
       yang timbul dari praktik informal entitas.                     obligation that arises from the entity’s informal
                                                                      practices.
       Biaya jasa kini, biaya jasa lalu dan keuntungan                Current service cost, past service cost and gain
       atau kerugian atas penyelesaian, serta bunga                   or loss on settlement, and net interets on the net
       neto atas liabilitas (aset) imbalan pasti neto                 defined benefit liability (asset) are recognized in
       diakui dalam laba rugi.                                        profit or loss.
       Pengukuran kembali atas liabilitas (aset)                      The remeasurement of the net defined benefit
       imbalan pasti neto yang terdiri dari keuntungan                liabilities (assets) comprises actuarial gains and
       dan kerugian aktuarial, imbalan hasil atas aset                losses, the return on plan assets and any
       program dan setiap perubahan dampak atas                       change in effect of the asset are recognized in
       aset diakui sebagai penghasilan komprehensif                   other comprehensive income.
       lain.
       Pesangon                                                       Termination Benefits
       Grup mengakui pesangon sebagai liabilitas dan                  The Group recognizes liability and expense for
       beban pada tanggal yang lebih awal di antara:                  termination benefits at the earlier of
                                                                      the following dates:
       a)   Ketika Grup tidak dapat lagi menarik                      a)   When the Group no longer can withdraw
            tawaran atas imbalan tersebut; dan                             the offer of those benefits; and
       b)   Ketika Grup mengakui biaya untuk                          b)   When the Group recognizes costs for a
            restrukturisasi yang berada dalam ruang                        restructuring within the scope of PSAK
            lingkup PSAK No. 237 dan melibatkan                            No. 237 and involves payment of
            pembayaran pesangon.                                           termination benefits.
       Grup    mengukur   pesangon    pada  saat                      The Group measures termination benefits on
       pengakuan awal, dan mengukur dan mengakui                      initial recognition, and measures and recognizes
       perubahan selanjutnya, sesuai dengan sifat                     subsequent changes, in accordance with
       imbalan kerja.                                                 the nature of the employee benefits.
       Saat ini Grup telah melakukan Restrukturisasi                  Currently the Group has carried out a policy
       polis dengan PT Asuransi Jiwasraya yang saat                   restructuring with PT Asuransi Jiwasraya which
       ini telah beralih ke Asuransi IFG Life sebagai                 has now switched to IFG Life Insurance as the
       pemilik polis hari tua pegawai. Grup                           owner of the employee retirement policy. The
       memberlakukan perhitungan sesuai dengan                        Group applies calculations in accordance with
       Undang-Undang Ketenagakerjaan. Sehingga                        the Labor Law. So there is no shortage of
       tidak ada kekurangan atas selisih benefit dari                 differences in benefits from insurance to
       asuransi kepada pegawai.                                       employees.
       Imbalan Kerja Jangka Panjang Lainnya                           Other Long-Term Employee Benefits
       Imbalan jangka panjang lain seperti cuti                       Other long-term benefits such as long service
       berimbalan jangka panjang dihitung dengan                      leave is calculated using the projected unit
       metode projected unit credit dan didiskontokan                 credit method and discounted to present value.
       ke nilai kini.




                                                          - 56 -
Page 60
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   cc. Investasi pada Entitas Asosiasi dan Ventura                  cc. Investment in Associates and Joint Ventures
       Bersama

       Entitas Asosiasi                                                Associates

       Investasi Grup pada entitas asosiasi diukur                     The Group's investment in associates is
       dengan menggunakan metode ekuitas. Entitas                      measured      using      the     equity    method.
       asosiasi adalah suatu entitas dimana Grup                       An associate     is    an     entity    in   which
       mempunyai        pengaruh      signifikan   atau                the Group has significant influence or share
       kepemilikan saham lebih dari 20% hak suara.                     ownership of more than 20% of the voting rights.
       Pengakuan awal investasi pada entitas asosiasi                  The initial recognition of investments in
       diakui sebesar biaya perolehan dan jumlah                       associates is recognized at cost and
       tercatat tersebut ditambah atau dikurangkan                     the carrying amount is increased or decreased
       untuk mengakui bagian Perusahaan atas laba                      to recognize the Group's share in the
       rugi entitas asosiasi setelah tanggal perolehan.                associates'     profit or loss after the acquisition
       Bagian Grup atas laba rugi entitas asosiasi                     date. The Company's share in the profit or loss
       diakui dalam laba rugi Grup. Penerimaan                         of associates is recognized in the Group's profit
       distribusi dari entitas asosiasi mengurangi nilai               or loss. Receipt of distributions from associates
       tercatat investasi.                                             reduces the carrying amount of the investment.

       Laporan      laba   rugi   dan     penghasilan                  The consolidated statements of profit or loss
       komprehensif lain konsolidasian mencerminkan                    and other comprehensive income            reflect
       bagian atas hasil operasi entitas asosiasi. Bila                the share of the results of operations of
       terdapat perubahan yang diakui langsung pada                    the associates. If there is a change that is
       ekuitas entitas asosiasi, Grup mengakui                         recognized       directly  in     the equity of
       bagiannya atas perubahan tersebut dan                           the associate, the Group recognizes its share of
       mengungkapkan hal ini, jika sebagai hasil                       the change and discloses this, if as a result of
       transaksi-transaksi antara Grup dan entitas                     transactions    between    the    Group      and
       asosiasi dielimininasi pada jumlah sesuai                       the associate are eliminated at amount in
       dengan kepentingan Grup dalan entitas                           accordance with the Group's interest in
       asosiasi.                                                       the associate.

       Setelah menerapkan metode ekuitas, Grup                         After     applying    the    equity      method,
       menentukan apakah diperlukan untuk mengakui                     the Group determines whether it is necessary to
       tambahan laba rugi penurunan nilai atas                         recognize additional impairment gain or loss on
       investasi Grup dalam entitas asosiasi. Grup                     the    Group's investment in associates.
       menentukan pada setiap tanggal pelaporan                        The Group determines at each reporting date
       apakah terdapat bukti yang objektif yang                        whether there is objective evidence that
       mengindikasikan bahwa investasi dalam entitas                   indicates that the investment in the associate is
       asosiasi mengalami penurunan nilai. Dalam hal                   impaired. If this is the case, the Group
       ini, Perusahaan menghitung jumlah penurunan                     calculates the amount of impairment based on
       berdasarkan selisih jumlah terpulihkan atas                     the difference between the recoverable amount
       investasi dalam entitas asosiasi dan nilai                      of the investment in associated companies and
       tercatatnya dan mengakuinya dalam laporan                       its carrying value and recognizes the amount in
       laba rugi dan penghasilan komprehensif lain                     the consolidated statement of profit or loss and
       konsolidasian.                                                  other comprehensive income.

       Grup menghentikan penggunaan metode                             The Group discontinues the use of the equity
       ekuitas sejak tanggal ketika investasinya                       method from the date when its investment
       berhenti menjadi investasi pada entitas asosiasi                ceases to be an associate as follows:
       sebagai berikut:

       a)   Jika investasi menjadi entitas anak, dan                   a)   If the investment becomes a subsidiary, and
       b)   Jika sisa kepentingan dalam entitas                        b)   If the retained interest in the former
            asosiasi merupakan aset keuangan, maka                          associate is a financial asset, the Group
            Grup mengukur sisa kepentingan tersebut                         measures the retained interest at fair value.
            pada nilai wajar.

       Ketika Grup menghentikan penggunaan metode                      When the Group discontinues the use of
       ekuitas, Grup mencatat seluruh jumlah yang                      the equity method, the Group accounts for all
       sebelumnya telah diakui dalam penghasilan                       amounts previously recognized in other
       komprehensif lain yang terkait dengan investasi                 comprehensive income in relation to that
       tersebut menggunakan dasar perlakuan yang                       investment on the same basis as would have
       sama dengan yang disyaratkan jika investee                      been required if the investee had directly
                                                           - 57 -
Page 61
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

       telah melepaskan secara langsung aset dan                      disposed of the related assets or liabilities.
       liabilitas terkait.
       Pengaturan Bersama                                             Joint Arrangement
       Pengaturan bersama adalah pengaturan atas                      Joint arrangement is an arrangement is which
       dua     atau    lebih  pihak     yang  memiliki                two or more parties have joint control, i.e.
       pengendalian bersama, yaitu persetujuan                        the contractually agreed sharing of control of an
       kontraktual untuk berbagi pengendalian atas                    arrangement, which exists only when decisions
       suatu pengaturan, yang hanya ada ketika                        about     the    relevant   activities    require
       keputusan      mengenai      aktivitas relevan                 the unanimous consent of the parties sharing
       mensyaratkan persetujuan dengan suara bulat                    control.
       dari seluruh pihak yang berbagi pengendalian.
       Grup mengklasifikasikan pengaturan bersama                     The Group classifies joint arrangement as:
       sebagai:

       1)   Operasi Bersama                                           1)   Joint Operation
            Merupakan pengaturan bersama yang                              Represents joint arrangement whereby
            mengatur bahwa para pihak yang memiliki                        the parties        that have joint control of
            pengendalian bersama atas pengaturan                           the    arrangement        have     rights   to
            memiliki hak atas aset dan kewajiban                           the     assets,      and     obligations   for
            terhadap     liabilitas, terkait dengan                        the liabilities, relating to the arrangement.
            pengaturan tersebut. Para pihak tersebut                       Those parties are called joint operator.
            disebut operator bersama.
            Operator bersama mengakui hal berikut                          A joint operator recognizes in relation to its
            terkait dengan kepentingannya dalam                            interest in a joint operation:
            operasi bersama:
            a) Aset, mencakup bagiannya atas setiap                        a)   Assets, including its share of any
               aset yang dimiliki bersama;                                      assets held jointly;
            b) Liabilitas, mencakup bagiannya atas                         b)   Liabilities, including its share of any
               liabilitas yang terjadi bersama;                                 liabilities incurred jointly;
            c) Pendapatan dari penjualan bagiannya                         c)   Revenue from the sale of its share of
               atas output yang dihasilkan dari operasi                         the output arising from the joint
               bersama;                                                         operation;
            d) Bagian atas pendapatan dari penjualan                       d)   Share of the revenue from the sale of
               output oleh operasi bersama; dan                                 the output by the joint operation; and
            e) Beban, mencakup bagiannya atas                              e)   Expenses, including its share of any
               setiap beban yang terjadi secara                                 expenses incurred jointly.
               bersama-sama.
       2)   Ventura Bersama                                           2)   Joint Venture
            Grup     mengklasifikasikan pengaturan                         The Group classifies joint arrangement as a
            bersama sebagai ventura bersama yang                           joint venture whereby the parties that
            mengatur bahwa para pihak yang memiliki                        have joint control of the arrangement have
            pengendalian bersama atas pengaturan                           rights to the net assets of the arrangement.
            memiliki hak atas aset neto pengaturan                         Those parties are called joint venturers.
            tersebut. Para pihak tersebut disebut
            sebagai venturer bersama.
            Venturer        bersama       mengakui                         A joint venturer recognizes its interest in a
            kepentingannya dalam ventura bersama                           joint venture as an investment and account
            sebagai investasi dan mencatat investasi                       for    that   investment   using the equity
            tersebut dengan menggunakan metode                             method.
            ekuitas.
            Bagian Grup atas laba atau rugi entitas                        The Group’s share of post-acquisition
            asosiasi pasca akuisisi diakui dalam                           profits or losses is recognized in the profit or
            laporan laba rugi dan bagian atas mutasi                       loss and its share of post-acquisition
            penghasilan komprehensif lain-lain pasca                       movements in other comprehensive income
            akuisisi diakui di dalam penghasilan                           is recognized in other comprehensive
            komprehensif lain dan diikuti dengan                           income with a corresponding adjustment to

                                                          - 58 -
Page 62
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

           penyesuaian pada jumlah tercatat investasi.                    the carrying amount of the investment.
           Dividen yang akan diterima dari entitas                        Dividends receivable from joint ventures are
           asosiasi diakui sebagai pengurang jumlah                       recognized as a reduction in the carrying
           tercatat investasi. Jika bagian Grup atas                      amount     of    the   investment.      When
           kerugian entitas asosiasi sama dengan atau                     the Group’s share of losses in a joint
           melebihi kepentingannya pada entitas                           ventures equal or exceeds its interest in
           asosiasi, termasuk piutang tanpa agunan,                       the associate, including any other
           Grup menghentikan pengakuan bagian                             unsecured receivables, the Group does not
           kerugiannya,     kecuali    Grup   memiliki                    recognize further losses, unless it has
           kewajiban atau melakukan pembayaran                            incurred legal or constructive obligations or
           atas nama entitas asosiasi.                                    made payments on behalf of the associates.

           Kerugian yang melebihi nilai tercatat                          Loss exceeding the carrying value of
           investasi tidak diakui, kecuali bila Grup                      the investment is not recognized, unless
           mempunyai komitmen untuk memberikan                            the Group has committed to provide
           bantuan     keuangan      atau  menjamin                       financial            support or guarantee
           kewajiban entitas asosiasi.                                    the associates’ obligation.

           Laba dan rugi yang dihasilkan dari transaksi                   Profits and losses resulting from upstream
           hulu dan hilir antara Grup dengan entitas                      and downstream transactions between
           asosiasi diakui dalam laporan keuangan                         the Group and its joint ventures are
           konsolidasian Grup hanya sebesar bagian                        recognized in the Group’s consolidated
           investor lain dalam entitas asosiasi.                          financial statements only to the extent of
                                                                          the unrelated investor’s interests in the joint
                                                                          ventures.

           Dalam      akuntansi    metode      ekuitas,                   Under the equity method of accounting,
           kepentingan dalam ventura bersama diakui                       interests in joint ventures are initially
           pada biaya perolehan dan disesuaikan                           recognized at cost and adjusted thereafter
           selanjutnya untuk mengakui bagian Grup                         to recognize the Group’s share of profits or
           atas    laba    rugi    dan     penghasilan                    losses and other comprehensive income
           komperhensif lain pasca perolehan. Ketika                      post acquisition. When the Group’s share of
           bagian grup atas rugi dalam ventura                            losses in a joint venture equals or exceeds
           bersama sama dengan atau melebihi                              its interests in the joint ventures (which
           kepentingannya dalam ventura bersama                           includes any long-term interests that, in
           (dimana termasuk kepentingan jangka                            substance, form part of the Group’s net
           panjang, dalam substansinya membentuk                          investment in the joint ventures), the Group
           bagian dari investasi bersih Grup dalam                        does not recognize further losses, unless it
           ventura bersama), Grup tidak mengakui                          has incurred obligations or made payments
           kerugian selanjutnya, kecuali telah menjadi                    on behalf of the joint ventures.
           kewajiban     atau     telah     melakukan
           pembayaran atas nama ventura bersama.

           Keuntungan yang belum terealisasi atas                         Unrealized gains on transactions between
           transaksi antara Grup dan ventura bersama                      the Group and its joint ventures are
           dieliminasi sebesar kepentingan Grup                           eliminated to the extent of the group’s
           dalam ventura bersama. Kerugian yang                           interest in the joint ventures. Unrealized
           belum terealisasi juga dieliminasi kecuali                     losses are      also eliminated     unless
           transaksi tersebut memberikan bukti                            the transaction provides evidence of an
           adanya penurunan nilai aset yang dialihkan.                    impairment of the asset transferred.
           Kebijakan akuntansi ventura bersama telah                      Accounting policies of the joint ventures
           diubah jika diperlukan untuk memastikan                        have been changed where necessary to
           konsistensi dari kebijakan yang diterapkan                     ensure consistency with the policies
           oleh Grup.                                                     adopted by the Group.

   dd. Obligasi Wajib Konversi                                     dd. Mandatory Convertible Bond

       Sesuai PSAK 232 Instrumen Keuangan pada                        In accordance with PSAK 232 Financial
       paragraf 11 disebutkan ketika penerbit                         Instruments in paragraph 11, when the issuer
       menerapkan definisi untuk menentukan apakah                    applies the definition to determine whether a
       instrumen keuangan merupakan instrumen                         financial instrument is an equity instrument, and
       ekuitas, dan bukan merupakan liabiltas                         not a financial liability, the instrument is an
       keuangan, maka instrumen tersebut merupakan                    equity instrument if and only if both conditions

                                                          - 59 -
Page 63
PT WASKITA KARYA (PERSERO) Tbk                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                           (Expressed in Rupiah, unless otherwise stated)

         instrumen ekuitas jika dan hanya jika kedua                          are met:
         kondisi terpenuhi:

         a.   Instrumen tersebut tidak memiliki kewajiban                     a.   The instrument          has    no    contractual
              kontraktual:                                                         obligation:
              •   Untuk menyerahkan kas atau aset                                  •     To deliver cash or other financial assets
                  keuangan lain kepada entitas lain; atau                                to another entity; or
              •   Untuk mempertukarkan aset keuangan                               •     To exchange financial assets or
                  atau liabilitas keuangan dengan entitas                                financial liabilities with other entities on
                  lain dengan kondisi baik yang                                          favorable terms that are potentially
                  berpotensi       tidak  menguntungkan                                  unfavorable to the issuer.
                  penerbit.
         b.   Jika instrumen tersebut akan atau mungkin                       b.   If the instrument will or may be settled in
              diselesaikan dengan instrumen ekuitas                                the entity's   own     equity  instruments,
              yang diterbitkan entitas, instrumen tersebut                         the instrument is:
              merupakan:
              • Nonderivatif       yang     tidak   dimiliki                       •     Non-derivatives that do not have a
                  kewajiban kontraktual bagi penerbitnya                                 contractual obligation for the issuer to
                  untuk menyerahkan suatu jumlah yang                                    deliver     a   variable     number     of
                  bervariasi dari instrumen ekuitas yang                                 the entity's own equity instruments; or
                  diterbitkan entitas; atau
              • Derivatif yang akan diselesaikan hanya                             •     A derivative that will be settled only by
                  dengan mempertukarkan sejumlah                                         exchanging a specified amount of cash
                  tertentu kas atau aset keuangan lain                                   or another financial asset for a specified
                  dengan sejumlah tertentu instrumen                                     number of equity instruments issued by
                  ekuitas yang diterbitkan entitas.                                      the entity.
    ee. Investasi Jangka Panjang Lainnya                                ee. Other Long-Term Investment
         Merupakan       investasi   saham      dengan                        Represent a shares investment with an
         kepemilikan kurang dari 20% atau tidak memiliki                      ownership less than 20% or does not have
         pengaruh signifikan yang pada awalnya diakui                         significant influence that are recognized initially
         sebesar nilai wajar sesuai dengan PSAK 109.                          at fair value according to PSAK 109. The best
         Bukti terbaik dari nilai wajar adalah harga                          evidence of fair value is the current market price
         kuotasi di pasar aktif.                                              quotations.
   ff.   Laba per Saham                                                 ff.   Earnings per Share
         Laba per saham dasar dihitung dengan                                 Basic earnings per share is computed by
         membagi laba bersih diatribusikan kepada                             dividing net income attributable to the owner of
         pemegang saham biasa entitas induk dengan                            the common shareholders parent entity by
         jumlah rata-rata tertimbang saham yang beredar                       the weighted average number of shares
         dalam satu periode.                                                  outstanding during the period.
         Jika jumlah saham biasa atau instrumen                               If the number of ordinary shares or potential
         keuangan berpotensi saham biasa yang beredar                         financial instruments to be ordinary shares
         meningkat sebagai akibat dari kapitalisasi,                          outstanding increases as a result of
         penerbitan saham bonus atau pemecahan                                capitalisation, bonus issue or share split, or
         saham, atau menurun sebagai akibat dari                              decreases as a result of a reverse share split,
         penggabungan saham, perhitungan laba per                             the calculation of basic and diluted earnings per
         saham dasar dan dilusian untuk seluruh periode                       share for all periods presented shall be adjusted
         yang disajikan harus disesuaikan secara                              retrospectively.
         retrospektif.
         Jumlah rata-rata tertimbang saham beredar                            The number of weighted average shares
         untuk perhitungan laba per saham dasar adalah                        outstanding for the calculation of basic earnings
         sebesar 28.806.807.016 lembar pada tanggal                           per share amounting to 28,806,807,016 as of
         30 September 2024 dan 31 Desember 2023                               September 30, 2024 and December 31, 2023,
         (Catatan 51).                                                        respectively (Note 51).
   gg. Biaya Emisi Obligasi Saham                                       gg. Bonds and Shares Issuance Costs
         Biaya emisi obligasi merupakan biaya transaksi                       Bond issuance costs are transaction costs to be
         yang harus dikurangkan langsung dari hasil                           deducted from the proceeds in order to

                                                               - 60 -
Page 64
PT WASKITA KARYA (PERSERO) Tbk                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                          (Expressed in Rupiah, unless otherwise stated)

         emisi dalam rangka menentukan hasil emisi                           determine the net proceeds of bonds.
         bersih obligasi. Selisih antara hasil emisi bersih                  The difference between the net proceeds and
         dengan nilai nominal merupakan diskonto atau                        the nominal value is a discount or premium and
         premium dan diamortisasi selama jangka waktu                        will  be    amortized      over the term of the
         obligasi yang bersangkutan.                                         bonds.
         Biaya emisi saham disajikan sebagai bagian                          Share issuance costs are presented as a
         tambahan modal disetor dan tidak diamortisasi.                      deduction from the additional paid-in capital and
         Biaya emisi saham disajikan sebagai pengurang                       not amortized.
         dari tambahan modal disetor dan tidak
         diamortisasi.

   hh. Segmen Operasi                                                  hh. Operating Segment

         Grup menyajikan segmen operasi berdasarkan                          The Group presented operating segments
         informasi keuangan yang digunakan oleh                              based on the financial information used by
         pengambil keputusan operasional dalam menilai                       the chief operating decision maker in assessing
         kinerja segmen dan menentukan alokasi                               the performance of segments            and    in
         sumber daya yang dimilikinya. Segmen                                the allocation of resources. The segments are
         didasarkan pada aktivitas dari setiap kegiatan                      based on the activities of each operating legal
         operasi entitas legal di dalam Grup.                                entities within the Group.

         Segmen operasi adalah suatu komponen dari                           An operating segment is a component of
         entitas:                                                            the entity:

         •   Yang terlibat dalam aktivitas bisnis yang                       •   That engages in business activities from
             memperoleh pendapatan dan menimbulkan                               which it may earn revenues and incur
             beban (termasuk pendapatan dan beban                                expenses      (including     revenues   and
             yang terkait dengan transaksi dengan                                expenses relating to the transactions with
             komponen lain dari entitas yang sama);                              other components of the same entity);
         •   Yang hasil operasinya dikaji ulang secara                       •   Whose operating results are regularly
             regular     oleh   pengambil     keputusan                          reviewed by chief operating decision maker
             operasional untuk membuat keputusan                                 to make decisions about resources         to
             tentang sumber daya yang dialokasikan                               be      allocated        to the segment and
             pada segmen tersebut dan menilai                                    assesses its performance; and
             kinerjanya; dan
         •   Yang informasi keuangan yang terpisah                           •   For which separate financial information is
             miliknya tersedia.                                                  available.

   ii.   Sumber    Ketidakpastian  Estimasi           dan              ii.   Source of Estimation Uncertainy and Critical
         Pertimbangan Akuntansi Penting                                      Accounting Judgements

         Dalam penerapan kebijakan akuntansi Grup                            In the application of the Group’s accounting
         diatas, Direksi diwajibkan untuk membuat                            policies above, the Directors are required to
         penilaian, estimasi dan asumsi tentang jumlah                       make judgments, estimates and assumptions
         tercatat aset dan liabilitas yang tidak tersedia                    about the carrying amounts of assets and
         dari sumber lain. Estimasi dan asumsi yang                          liabilities that are not readily apparent from other
         terkait didasarkan pada pengalaman historis                         sources. The estimates and associated
         dan faktor-faktor lain yang dianggap relevan.                       assumptions are based on historical experience
         Hasil aktualnya mungkin berbeda dari estimasi                       and other factors that are considered to be
         tersebut.                                                           relevant. Actual results may differ from these
                                                                             estimates.

         Estimasi dan asumsi yang mendasari ditelaah                         The estimates and underlying assumptions are
         secara berkelanjutan. Revisi estimasi akuntansi                     reviewed on an ongoing basis. Revisions to
         diakui dalam periode yang perkiraan tersebut                        accounting estimates are recognized in
         direvisi jika revisi hanya mempengaruhi periode                     the period which the estimate is revised if
         itu, atau pada periode revisi dan periode masa                      the revision affects only that period, or in
         depan jika revisi mempengaruhi kedua periode                        the period of the revision and future periods if
         saat ini dan masa depan.                                            the revision affects both current and future
                                                                             periods.


                                                              - 61 -
Page 65
PT WASKITA KARYA (PERSERO) Tbk                                                       PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                   AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                           FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                     FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                           ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                   AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                            (Expressed in Rupiah, unless otherwise stated)

4.   PERTIMBANGAN KRITIS AKUNTANSI DAN                            4.   CRITICAL ACCOUNTING JUDGMENTS AND KEY
     SUMBER UTAMA KETIDAKPASTIAN ESTIMASI                              SOURCES OF ESTIMATION UNCERTAINTY

     Pertimbangan Kritis dalam Penerapan Kebijakan                     Critical Judgments in         Applying Accounting
     Akuntansi                                                         Policies

     Dalam penerapan kebijakan akuntansi Grup, yang                    In the application of the Group accounting policies,
     dijelaskan dalam catatan 3, direksi diwajibkan untuk              which are described in note 3, the directors are
     membuat pertimbangan, estimasi dan asumsi                         required to make judgments, estimates and
     tentang jumlah tercatat aset dan liabilitas yang tidak            assumptions about the carrying amounts of assets
     tersedia dari sumber lain. Estimasi dan asumsi yang               and liabilities that are not readily apparent from other
     terkait didasarkan pada pengalaman historis dan                   sources. The estimates and associated assumptions
     faktor-faktor lain yang dianggap relevan. Hasil                   are based on historical experience and other factors
     aktualnya mungkin berbeda dari estimasi tersebut.                 that are considered to be relevant. Actual results
                                                                       may differ from these estimates.

     Estimasi dan asumsi yang mendasari ditelaah                       The estimates and underlying assumptions are
     secara berkelanjutan. Revisi estimasi akuntansi                   reviewed on an ongoing basis. Revisions to
     diakui dalam periode dimana estimasi tersebut                     accounting estimates are recognized in the period
     direvisi jika revisi hanya mempengaruhi periode                   which the estimate is revised if the revision affects
     tersebut, atau pada periode revisi dan periode masa               only that period, or in the period of the revision and
     depan jika revisi mempengaruhi periode saat ini dan               future periods if the revision affects both current and
     masa depan.                                                       future periods.

     Penenerapan Suatu Pengaturan                                      The adoption of an arrangement

     Penerapan suatu pengaturan adalah tidak praktis                   The adoption of an arrangement is not practical
     ketika entitas tidak dapat menerapkannya setelah                  when the entity cannot apply it after the whole
     seluruh usaha yang rasional dilakukan. Untuk suatu                rational business done. For a period previously
     periode sebelumnya tertentu, tidak praktis untuk                  specified, it is not practical to apply a change in
     menerapkan suatu perubahan kebijakan akuntansi                    accounting policy retrospectively or serves or
     secara retrospektif atau menyajikan atau penyajian                restatement of the retrospective to correct an error if:
     kembali retrospektif untuk mengoreksi kesalahan
     jika:

     -   Dampak penerapan retrospektif atau penyajian                  -      The impact of application of retrospective or
         kembali retrospektif tidak dapat ditentukan;                         restatement of the retrospective can not be
                                                                              done;
     -   Penerapan retrospektif atau penyajian kembali                 -      The application of retrospective or restatement
         retrospektif memerlukan asumsi mengenai                              of the retrospective requires an assumption
         maksud manajemen yang ada pada periode                               about the intent of management that exist in
         sebelumnya tersebut; atau                                            the previous period; or
     -   Penerapan retrospektif atau penyajian kembali                 -      The application of retrospective or restatement
         retrospektif memerlukan estimasi signifikan atas                     of the retrospective requires significant
         jumlah dan tidak mungkin untuk membedakan                            estimates on the amount and it is impossible to
         secara obyektif informasi mengenai estimasi                          distinguish   objectively  information    about
         yang:                                                                the estimation:

         1.   Menyediakan bukti atas keadaan yang ada                         1.   Provides evidence of circumstances that
              pada tanggal disaat jumlah tersebut diakui,                          existed on the date when such amounts
              diukur atau diungkapkan; dan                                         recognized, measured or disclosed; and
         2.   Tersedia ketika laporan keuangan periode                        2.   Available when the financial statement of
              sebelumnya diselesaikan dengan informasi                             the previous period is resolved with other
              lain.                                                                information.

     Perjanjian Konsesi Jasa                                           Service Concession Arrangement

     ISAK    112   menjelaskan     pendekatan    untuk                 ISAK 112 outlines an approach to account for
     membukukan perjanjian konsesi jasa akibat dari                    service concession arrangement arising from entities
     penyediaan jasa kepada publik. ISAK 112 mengatur                  providing public services. It provides that
     bahwa operator (pihak penerima konsesi jasa) tidak                the operator (concession right beneficiary) should
     membukukan infrastruktur sebagai aset tetap,                      not account for the infrastructure as property and

                                                              - 62 -
Page 66
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   namun diakui sebagai aset keuangan dan/atau aset                 equipment, but should be recognized as a financial
   tak berwujud. Badan Pengatur Jalan Tol (BPJT)                    asset and/or an intangible asset. Indonesia Toll
   memberikan hak, kewajiban dan keistimewaan                       Road Authority (BPJT) granted the Group the rights,
   kepada Grup termasuk kewenangan dalam                            obligations and privileges including the authority to
   pendanaan, desain, konstruksi, operasi dan                       finance, design, construct, operate and maintain
   pemeliharaan jalan tol. Pada akhir masa konsesi                  the toll roads. Upon expiry of the           service
   jasa, Grup harus menyerahkan jalan tol kepada                    concession      period, the Group shall handover
   BPJT tanpa biaya, dalam keadaan beroperasional                   the toll roads to the BPJT without cost, fully
   dan kondisi yang baik, termasuk setiap dan semua                 operational and in good working condition, including
   tanah yang diperlukan, pekerjaan, fasilitas jalan dan            any and all existing land, works, toll road facilities
   peralatan tol yang secara langsung berkaitan dan                 and equipment found therein directly related to, and
   berhubungan dengan pengoperasian fasilitas jalan                 in connection with, the operation of the toll road
   tol.   Grup    berpendapat     bahwa       Perjanjian            facilities. The Group has made judgment that
   Pengusahaan Jalan Tol (PPJT) memenuhi kriteria                   the Toll Road Concession Agreement (PPJT)
   sebagai model aset tak berwujud, di mana aset                    qualifies under the intangible asset model, wherein
   konsesi diakui sebagai aset tak berwujud sesuai                  the concession asset is recognized as an intangible
   dengan PSAK 238, “Aset Tak Berwujud”.                            asset in accordance with PSAK 238, “Intangible
                                                                    Assets”.

   WTR (entitas anak) yang memiliki hak pengusahaan                 WTR (subsidiary) who has the toll road concession
   jalan tol diharuskan oleh ISAK 112 untuk menyajikan              is required by ISAK 112 to present an income line
   unsur pendapatan yang merefleksikan pendapatan                   reflecting the income from construction or
   dari jasa konstruksi atas aset konsesi atau                      improvements to concession assets made during
   peningkatan kemampuan aset konsesi yang                          the period in the consolidated statement of profit or
   dilakukan selama periode berjalan pada laporan                   loss and other comprehensive income. WTR
   laba rugi dan penghasilan komprehensif lain                      recognizes construction revenues of concession
   konsolidasian.     WTR      mengakui    pendapatan               asset and construction costs in accordance with
   konstruksi aset konsesi dan biaya konstruksi sesuai              PSAK 115. Subsidiary, WTR measures construction
   dengan PSAK 115. Entitas anak, WTR mengukur                      revenues at cost with zero margin based on
   pendapatan konstruksi atas aset konsesi dengan                   management estimation calculated by a certain
   menggunakan metode biaya dengan marjin nol                       model, in determining the initial toll road tariff before
   berdasarkan estimasi terbaik manajemen yang                      the toll road is operated.
   dihitung dengan model tertentu pada saat
   penentuan tarif awal jalan tol sebelum jalan tol
   dioperasikan.

   Sumber Ketidakpastian Estimasi                                   Key Sources of Estimation Uncertainy

   Restrukturisasi                                                  Restructuring

   Provisi restrukturisasi diakui ketika Grup telah                 A restructuring provision is recognized when
   menciptakan perkiraan yang valid kepada pihak-                   the Group has developed a detailed formal plan for
   pihak yang terkena dampak restrukturisasi bahwa                  the restructuring and has raised a valid expectation
   entitas akan melaksanakan restrukturisasi dengan                 in those affected that it will carry out
   memulai implementasi rencana tersebut atau                       the restructuring by starting to implement the plan or
   mengumumkan pokok-pokok rencana. Pengukuran                      announcing its main features to those affected by it.
   provisi restrukturisasi hanya mencakup pengeluaran               The measurement of a restructuring provision
   langsung yang timbul dari restrukturisasi, di mana               includes only the direct expenditures arising from
   jumlah tersebut benar-benar harus dikeluarkan                    the restructuring, which are those amounts that are
   dalam rangka restrukturisasi; dan tidak terkait                  both necessarily entailed by the restructuring and
   dengan aktivitas entitas yang masih berlangsung.                 not associated with the ongoing activities of
                                                                    the entity.

   Rugi Penurunan Nilai Pinjaman yang Diberikan dan                 Impairment Loss on Loans and Receivables
   Piutang

   Grup menilai penurunan nilai pinjaman yang                       The Group assesses its loans and receivables for
   diberikan dan piutang pada setiap tanggal                        impairment at each reporting date. The fair value of
   pelaporan. Nilai wajar piutang ditentukan dengan                 accounts receivable is determined by calculating
   memperhitungkan penurunan nilai yang bersifat                    the permanent impairment and the carrying value is
   permanen dan nilai tercatatnya dikurangi untuk                   reduced to recognize the decline. The assumptions
   mengakui penurunan tersebut. Asumsi yang                         used to determine the allowance for impairment of

                                                           - 63 -
Page 67
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   digunakan untuk menentukan penyisihan penurunan                  receivables based on an individual assessment of
   nilai piutang didasarkan penilaian secara individual             each receivable debtor (employer).
   atas piutang masing-masing debitur (pemberi kerja).

   Taksiran Masa Manfaat Ekonomis Aset Tetap                        Estimated Useful Lives of Property and Equipment

   Masa manfaat setiap aset tetap Grup ditentukan                   The useful life of each item of the Group’s property
   berdasarkan kegunaan yang diharapkan dari                        and equipment are estimated based on the period
   penggunaan aset tersebut. Estimasi ini ditentukan                over which the asset is expected to be available for
   berdasarkan     evaluasi     teknis   internal  dan              use. Such estimation is based on internal technical
   pengalaman atas aset sejenis. Masa manfaat setiap                evaluation and experience with similar assets.
   aset direviu secara periodik dan disesuaikan apabila             The estimated useful life of each asset is reviewed
   prakiraan berbeda dengan estimasi sebelumnya                     periodically and updated if expectations differ from
   karena keausan, keusangan teknis dan komersial,                  previous estimates due to physical wear and tear,
   hukum atau keterbatasan lainnya atas pemakaian                   technical or commercial obsolescence and legal or
   aset. Namun terdapat kemungkinan bahwa hasil                     other limits on the use of the asset. It is possible,
   operasi dimasa mendatang dapat dipengaruhi                       however, that future results of operations could be
   secara signifikan oleh perubahan atas jumlah serta               materially affected by changes in the amounts and
   periode pencatatan biaya yang diakibatkan oleh                   timing of recorded expenses brought about by
   perubahan faktor yang disebutkan di atas.                        changes in the factors mentioned above.

   Perubahan masa manfaat aset tetap dapat                          A change in the estimated useful life of any item of
   mempengaruhi jumlah biaya penyusutan yang diakui                 property and equipment would affect the recorded
   dan penurunan nilai tercatat aset tetap.                         depreciation expense and decrease in the carrying
                                                                    values of property and equipment.

   Nilai Wajar Properti Investasi                                   Fair Value of Investment Property

   Nilai wajar dari properti investasi ditentukan                   The fair value of investment property is determined
   menggunakan teknik valuasi. Valuasi properti                     by using valuation techniques. The Group’s
   investasi milik Grup dilakukan oleh penilai                      investment properties were valued by independent
   independen professional yang memiliki kualifikasi                professionally qualified valuers who hold a
   yang relevan dan memiliki pengalaman yang                        recognised relevant professional qualification and
   berhubungan dengan segmen properti investasi                     have recent experience in the segment of related
   yang akan dinilai untuk semua properti investasi.                investment properties. The fair value for all
   Nilai wajar untuk semua properti investasi ditentukan            investment properties was determined using relevnt
   pendekatan yang relevan dengan masing-masing                     approach to its investment property.
   properti investasi.

   Provisi Pelapisan Jalan Tol                                      Provision for Overlay

   Biaya pelapisan ini akan dicadangkan secara                      The provision for overlay is detemined periodically
   berkala berdasarkan estimasi seiring dengan                      based on the estimated utilization of toll road by
   penggunaan jalan tol oleh pelanggan. Provisi diukur              customers. This provision is measured using
   dengan nilai kini atas estimasi manajemen terhadap               the present value of the management‘s estimate
   pengeluaran yang diperlukan untuk menyelesaikan                  of the expenditures required to settle present
   liabilitas kini pada tanggal pelaporan.                          obligation at the reporting date.

   Liabilitas Imbalan Pasca Kerja                                   Post-Employment Benefits Obligation

   Nilai kini liabilitas imbalan pasca kerja tergantung             The present value of post-employment benefit
   pada beberapa faktor yang ditentukan dengan dasar                liabilities depends on several factors which are
   aktuarial berdasarkan beberapa asumsi. Asumsi                    determined by actuarial basis based on several
   yang     digunakan      untuk   menentukan     biaya             assumptions. Assumptions used to determine
   (penghasilan) pensiun neto mencakup tingkat                      pensions cost (benefits) covered discount rate.
   diskonto. Perubahan asumsi ini akan mempengaruhi                 The changes of assumptions might affect carrying
   jumlah tercatat imbalan pasca kerja.                             value of post-employment benefits.

   Grup menentukan tingkat diskonto yang sesuai pada                The Group determines the appropriate discount rate
   akhir pelaporan, dengan mempertimbangkan tingkat                 at the final reporting, by considering the discount
   suku bunga obligasi pemerintah yang didenominasi                 rate of government’s bond which denominated in
   dalam mata uang imbalan yang akan dibayar dan                    benefit’s currency that will be paid and have a

                                                           - 64 -
Page 68
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   memiliki jangka waktu yang serupa dengan jangka                  similar term with the terms of the related liabilities.
   waktu liabilitas yang terkait.

   Pajak Penghasilan Final                                          Final Income Tax

   Pajak penghasilan dari aktivitas jasa konstruksi                 Income tax from construction is computed based on
   dihitung berdasarkan Peraturan Pemerintah (PP)                   the Government Regulation (PP) No. 40 year 2009
   No. 40 tahun 2009 mengenai perubahan atas PP                     concerning amendments of Government Regulation
   No. 51 tahun 2008 tentang pajak penghasilan atas                 No. 51 year 2008 concerning income tax from
   penghasilan dari usaha jasa konstruksi yang berlaku              the construction business that is effective starting
   efektif mulai tanggal 1 Agustus 2008, dimana                     August 1, 2008, where the final tax at 3% is applied
   perlakuan pengenaan pajak final dikenakan atas                   for contract signed starting August 1, 2008.
   kontrak sebesar 3% yang diperoleh mulai tanggal 1
   Agustus 2008.

   Pada tahun 2022, Pemerintah mengeluarkan                         In 2022, the Indonesian Government issued
   Peraturan Pemerintah Nomor 9 Tahun 2022 tentang                  Government Regulation No. 9 Year 2022 (“PP No.
   Perubahan Kedua atas Peraturan Pemerintah                        9/2022”) concerning Second Amendment of
   Nomor 51 Tahun 2008 tentang Pajak Penghasilan                    Government Regulation No. 51 Year 2008
   atas Penghasilan dari Usaha Jasa Konstruksi.                     concerning Income Tax on Income from
   Melalui peraturan ini, Pemerintah memutuskan                     Construction Services Business. Through this
   beberapa kebijakan baru dan salah satunya terkait                regulation, the Government issued some new
   dengan penyesuaian tarif pajak penghasilan final                 policies, one of which is related to the adjustment of
   menjadi sebesar 2,65% yang mulai berlaku pada                    the final income tax rate to 2.65% which is effective
   tanggal 21 Februari 2022 dan seterusnya.                         on February 21, 2022 onwards.

   Pajak penghasilan final disajikan di luar beban pajak            Final income tax is presented outside of the income
   penghasilan pada laba rugi.                                      tax expenses in profit or loss.

   Perbedaan nilai tercatat aset atau liabilitas yang               The difference between the final income tax carrying
   berhubungan dengan pajak penghasilan final                       amounts of existing assets and liabilities, and their
   dengan dasar pengenaan pajaknya tidak diakui                     respective final tax bases are not recognized as
   sebagai aset atau liabilitas pajak tangguhan.                    deferred tax assets or liabilities.

   Penurunan Nilai atas Goodwill                                    Impairment of Goodwill

   Uji penurunan nilai goodwill wajib dilakukan                     Impairment testing of goodwill is required to be
   sedikitnya setahun sekali tanpa memperhatikan                    performed at least annually irrespective of whether
   apakah telah terjadi indikasi penurunan nilai.                   or not there are indications of impairment.
   Penentuan nilai pakai aset tak berwujud                          Determining the value in use of intangible assets
   membutuhkan estimasi arus kas yang diharapkan                    requires the estimation of cash flows expected to be
   akan dihasilkan dari pemakaian berkelanjutan dan                 generated from the continued use and ultimate
   pelepasan akhir atas aset tersebut serta tingkat                 disposition of such assets and a suitable discount
   diskonto yang tepat untuk menghitung nilai kini.                 rate in order to calculate the present value.

   Manajemen berkeyakinan bahwa asumsi-asumsi                       While it is believed that the assumptions used in
   yang digunakan dalam estimasi nilai pakai dalam                  the estimation of the value in use of assets reflected
   laporan keuangan konsolidasian adalah tepat dan                  in the consolidated financial statements are
   wajar, namun demikian, perubahan signifikan dalam                appropriate and reasonable, significant changes in
   asumsi-asumsi tersebut dapat berdampak signifikan                this    assumptions      may      materially     affect
   pada jumlah nilai terpulihkan dan jumlah kerugian                the assessment of recoverable values and any
   penurunan nilai yang terjadi mungkin berdampak                   resulting impairment loss could have a material
   material pada hasil operasi Grup.                                adverse impact on the results of Group’s operations.

   Penilaian Instrumen Keuangan                                     Valuation of Financial Instruments

   Seperti dijelaskan dalam Catatan 59, Grup                        As described in Note 59, the Group uses valuation
   menggunakan teknik penilaian yang meliputi input                 techniques that include inputs that are not based on
   yang tidak didasarkan pada data pasar yang dapat                 observable market data to estimate the fair value of
   diobservasi untuk mengestimasi nilai wajar dari                  certain types of financial instruments.
   beberapa jenis instrumen keuangan.



                                                           - 65 -
Page 69
PT WASKITA KARYA (PERSERO) Tbk                                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                         (Expressed in Rupiah, unless otherwise stated)

     Direksi berpendapat bahwa teknik penilaian yang                                    The directors believe that the chosen valuation
     dipilih dan asumsi yang digunakan adalah tepat                                     techniques and assumptions used are appropriate in
     dalam menentukan nilai wajar dari instrumen                                        determining the fair value of financial instruments.
     keuangan.

     Arus Kas Masa Depan dari Perjanjian Jasa Konsesi                                   Future Cash     Flows from Service          Concession
                                                                                        Arrangement

     WSE menilai aset keuangannya dari proyek konsesi                                   WSE assesses its financial asset from concession
     pada setiap tanggal pelaporan. Manajemen                                           project at each reporting date. Management makes
     membuat penilaian mengenai metodologi dan                                          judgment as to the methodology and assumptions
     asumsi untuk memperkirakan jumlah dan waktu arus                                   for estimating the amount and timing of future cash
     kas masa depan dari pembayaran kapasitas. Nilai                                    flows of capacity payments. The carrying amount of
     tercatat aset keuangan dari proyek konsesi                                         financial asset from concession project is disclosed
     diungkapkan pada Catatan 23.                                                       in Note 23.

5.   KAS DAN SETARA KAS                                                            5.   CASH AND CASH EQUIVALENTS
                                                                                                         30 September/           31 Desember/
                                                                                                       September 30, 2024      December 31, 2023
                                                                                                              Rp                      Rp

        Kas/ Cash on Hand                                                                                     3.026.656.196          3.743.083.997
        Bank/ Cash in Banks
         Pihak Berelasi/ Related Parties
          Rupiah Indonesia/ Indonesian Rupiah
           PT Bank Negara Indonesia (Persero) Tbk                                                           358.498.982.454        417.372.461.872
           PT Bank Rakyat Indonesia (Persero) Tbk                                                           132.883.758.553         42.172.176.894
           Bank Tabungan Negara Syariah                                                                     114.765.036.507         32.357.185.941
           PT Bank Tabungan Negara (Persero) Tbk                                                             78.187.326.589         40.072.078.346
           PT Bank Mandiri (Persero) Tbk                                                                     69.265.444.553         90.911.678.757
           PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank Syariah Mandiri)                              2.224.609.586          1.367.129.456
           PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank BNI Syariah)                                     73.785.988             68.030.342
           PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank BRI Syariah Tbk)                                 13.908.473             14.043.473
          Dolar Amerika Serikat/ United States Dollar
           PT Bank Mandiri (Persero) Tbk                                                                        566.526.708            991.437.791
           PT Bank Negara Indonesia (Persero) Tbk                                                               202.077.616            851.679.001
          Yen Jepang/ Japanese Yen
           PT Bank Negara Indonesia (Persero) Tbk                                                            21.304.355.339          7.482.065.619
          Euro
           PT Bank Mandiri (Persero) Tbk                                                                          9.294.215              9.446.789
        Sub Jumlah/ Sub Total                                                                               777.995.106.581        633.670.439.281
         Pihak Ketiga/ Third Parties
         Rupiah Indonesia/ Indonesian Rupiah
          PT Bank CIMB Niaga Tbk                                                                             54.413.229.624         18.744.886.520
          PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                               43.369.909.671         82.052.748.130
          PT Bank Central Asia Tbk                                                                           12.914.816.021         14.815.786.313
          Bank Artha Graha Internasional                                                                      1.928.983.197             20.573.923
          Kospin Jasa                                                                                           304.538.201            714.267.116
          PT Bank UOB Indonesia                                                                                 113.588.447             72.980.910
          BPD Sulsel                                                                                             78.523.488            249.645.946
          PT Bank OCBC NISP Tbk                                                                                  72.005.928             31.157.470
          PT Bank BCA Syariah                                                                                    53.327.823             53.350.841
          PT Bank DKI                                                                                            51.381.920             81.951.452
          PT Bank Jtrust Indonesia Tbk                                                                           51.374.950             51.668.739
          PT Bank ICBC Indonesia                                                                                 40.865.383             40.864.575
          PT Bank Maybank Indonesia Tbk                                                                          39.480.521             27.544.703
          PT Bank Mestika Dharma Tbk                                                                             33.305.138             33.362.839
          PT Bank BPR Intidana Sukses Makmur                                                                     25.540.290             19.546.907
          PT Bank KB Bukopin Tbk                                                                                  4.947.977              5.007.977
          PT Bank Permata Tbk                                                                                     4.067.623              4.896.024
          PT Bank Mega Tbk                                                                                        3.979.691              4.429.691
          PT Bank CTBC Indonesia                                                                                  2.289.964              2.614.964
          PT Bank Woori Saudara Indonesia 1906 Tbk                                                                  651.610              1.962.790
          Bank Sumitomo Mitsui Indonesia                                                                            603.307                667.181
          PT Bank Pembangunan Daerah Bali                                                                                 --            21.983.262
          BPD Kalsel                                                                                                      --               585.000
         Riyal Arab Saudi/ Saudi Arabian Riyal
          The National Commercial Bank - Jeddah                                                                 131.182.201            131.182.201
         Ringgit Malaysia/ Malaysian Ringgit
          PT Bank Maybank Indonesia Tbk                                                                          12.328.016             12.328.016
        Sub Jumlah/ Sub Total                                                                               113.650.920.991        117.195.993.490
        Deposito Berjangka/ Time Deposits
         Pihak Berelasi/ Related Parties
          Rupiah Indonesia/ Indonesian Rupiah
           PT Bank Mandiri Taspen                                                                           200.000.000.000         60.000.000.000
           PT Bank Tabungan Negara (Persero) Tbk                                                             70.000.000.000        258.313.380.000
           PT Bank Syariah Indonesia Tbk                                                                     67.161.222.136         14.000.000.000
           PT Bank Rakyat Indonesia (Persero) Tbk                                                            62.520.000.000        207.812.215.472
           PT Bank Negara Indonesia (Persero) Tbk                                                            45.575.000.000          6.325.000.000
           PT Bank Mandiri (Persero) Tbk                                                                          5.000.000              5.000.000
           PT Bank Raya Indonesia                                                                                         --        20.000.000.000
        Sub Jumlah/ Sub Total                                                                               445.261.222.136        566.455.595.472


                                                                            - 66 -
Page 70
PT WASKITA KARYA (PERSERO) Tbk                                                         PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                             FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                       FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                             ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                     AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                              (Expressed in Rupiah, unless otherwise stated)

                                                                                              30 September/            31 Desember/
                                                                                            September 30, 2024       December 31, 2023
                                                                                                   Rp                       Rp
       Pihak Ketiga/ Third Parties
        Rupiah Indonesia/ Indonesian Rupiah
         Kospin Jasa                                                                               19.000.000.000          19.000.000.000
         PT Bank Pembangunan Daerah Sumatera Utara                                                 10.000.000.000                       --
         PT Bank Woori Saudara Indonesia 1906 Tbk                                                     532.500.000                       --
       Sub Jumlah/ Sub Total                                                                       29.532.500.000          19.000.000.000
       Jumlah/ Total                                                                            1.369.466.405.905       1.340.065.112.240
       Tingkat Suku Bunga Deposito Berjangka per Tahun (%)/
        Interest Rate of Time Deposits per Annum (%)                                             2,0% - 3,75%            1,9% - 2,5%
       Jangka Waktu/ Time Period                                                             1 - 3 Bulan/ Months     1 - 3 Bulan/ Months



                                                                                               30 September/           31 Desember/
                                                                                             September 30, 2024      December 31, 2023
                                                                                                    Rp                      Rp
     Kas yang Dibatasi Penggunaannya/ Restricted of Cash
      Pihak Berelasi/ Related Parties
       Rupiah Indonesia/ Indonesian Rupiah
        PT Bank Mandiri (Persero) Tbk                                                           1.236.985.454.624        3.812.739.729.899
        PT Bank Negara Indonesia (Persero) Tbk                                                    956.865.490.250        1.625.599.665.223
        PT Bank Rakyat Indonesia (Persero) Tbk                                                    608.101.089.917          750.896.288.233
        PT Bank Syariah Indonesia Tbk                                                              91.029.925.506          137.446.276.759
        Indonesia Eximbank                                                                                      --               3.053.266
        PT Bank Tabungan Negara (Persero) Tbk                                                                   --          59.480.925.000
       Dolar Amerika Serikat/ United States Dollar
        PT Bank Mandiri (Persero) Tbk                                                             212.438.794.960          244.509.269.894
        PT Bank Rakyat Indonesia (Persero) Tbk                                                     52.004.969.546           52.912.842.140
     Jumlah/ Total                                                                              3.157.425.724.803        6.683.588.050.414
      Pihak Ketiga/ Third Parties
      Rupiah Indonesia/ Indonesian Rupiah
       PT Bank CIMB Niaga Tbk                                                                      10.044.090.424               44.410.424
       PT Bank DKI                                                                                  6.205.873.600            6.185.491.941
       PT Bank UOB Indonesia                                                                        4.501.928.948            4.477.129.706
       PT Bank Maybank Indonesia Tbk                                                                1.319.740.292            1.312.581.980
       PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                           851.322.683              845.325.205
       PT Bank KB Bukopin Tbk                                                                         813.949.660              530.185.561
       PT Bank Permata Tbk                                                                            536.372.011              536.372.011
       PT Bank of China                                                                               307.704.652              305.544.016
       PT Bank Mega Tbk                                                                               125.091.786               95.592.831
       PT Bank CIMB Niaga Tbk - Unit Usaha/ Business Unit Syariah                                     121.422.480              121.782.800
       PT Bank KB Bukopin Syariah                                                                      79.841.281               57.229.943
       PT Bank OCBC NISP Tbk                                                                           51.381.743               51.741.816
       PT Bank Pan Indonesia Tbk                                                                       14.931.114               15.551.114
       PT Bank BTPN Tbk                                                                                         --                  70.328
     Sub Jumlah/ Sub Total                                                                         24.973.650.674           14.579.009.676

     Jumlah/ Total                                                                              3.182.399.375.477        6.698.167.060.090



   Bank yang dibatasi penggunaannya merupakan kas                            Restricted bank is cash in the Group's bank which
   di bank milik Grup yang penggunaan dan penarikan                          cannot be used or withdrawn for less than 3 months.
   dana tidak dapat digunakan dalam waktu kurang                             Currently the Company is requesting approval for
   dari 3 bulan. Saat ini Perusahaan sedang                                  amendments to the Master Restructuring Agreement
   melakukan permohonan persetujuan amandemen                                (MRA), so that the disbursement of receivables for
   perjanjian Master Restructuring Agreement (MRA),                          projects with a restructuring scheme is received in
   sehingga pencairan piutang atas proyek-proyek                             the Cash and Account Management Agreement
   dengan skema restrukturisasi diterima dalam                               (CAMA) escrow account, where the group cannot
   rekening escrow Cash and Account Management                               use the funds due to restrictions on their use. As of
   Agreement (CAMA), dimana grup tidak dapat                                 the reporting date, the amendment to the MRA
   menggunakan dana tersebut dikarenakan terdapat                            agreement is still in the process of fulfilling the
   pembatasan atas penggunaannya. Sampai dengan                              effective requirements.
   tanggal pelaporan, amandemen perjanjian MRA
   masih dalam proses pemenuhan syarat efektif.

   Berdasarkan Akta Notaris Ashoya Ratam S.H.,                               Based on the Notary Deed of Ashoya Ratam S.H.,
   M.Kn, No. 39 tanggal 25 Oktober 2021 perihal                              M.Kn, No. 39 dated October 25, 2021, regarding
   perjanjian pengelolaan    kas   dan     rekening                          cash management agreements and escrow
   penampungan, dimana didalam perjanjian tersebut                           accounts, where in the agreement article 2
   pasal 2 ayat 2.2, menginformasikan mekanisme                              paragraph 2.2, informs the mechanism for using and
   penggunaan dan penarikan dana dari rekening bank                          withdrawing funds from bank accounts which states
   yang menyebutkan syarat dan pembatasan di dalam                           the conditions and restrictions on the use and
   penggunaan dan penarikan dana. Atas informasi                             withdrawal of funds. Based on this information,
                                                                    - 67 -
Page 71
PT WASKITA KARYA (PERSERO) Tbk                                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                             (Expressed in Rupiah, unless otherwise stated)

     tersebut, rekening bank tersebut tidak termasuk di                                    the bank account is not included in the criteria for a
     dalam kriteria akun kas dan setara kas, dimana kas                                    cash and cash equivalent account, where cash and
     dan setara kas penggunaan dan penarikan dana                                          cash equivalents can be used and withdrawn for
     dapat digunakan kurang dari 3 bulan. Oleh karena                                      less than 3 months. Therefore, it is included in the
     itu termasuk kedalam bank yang dibatasi                                               banks whose use is restricted.
     penggunaannya.

6.   INVESTASI JANGKA PENDEK                                                         6.    SHORT TERM INVESTMENTS
                                                             30 September/                  31 Desember/
                                                           September 30, 2024             December 31, 2023
                                                                  Rp                             Rp
      Deposito yang Dibatasi Penggunaannya                                                                                                  Restricted of Time Deposit
       PT Bank Mandiri (Persero) Tbk                                8.448.200.000                 8.448.200.000                         PT Bank Mandiri (Persero) Tbk
      Jumlah                                                        8.448.200.000                 8.448.200.000                                                  Total


     Merupakan deposito berjangka Perusahaan yang                                          Represent Company’s restricted time deposits due
     dibatasi penggunaannya sampai dengan setahun                                          three months until one year and certificates of time
     dan sertifikat deposito berjangka yang dijadikan                                      deposits are pledged as collateral for long term bank
     jaminan atas pinjaman bank jangka panjang.                                            loans.

7.   PIUTANG USAHA - BERSIH                                                          7.    ACCOUNTS RECEIVABLE - NET

     a.   Piutang Usaha Lancar - Bersih                                                   a.     Current Account Receivable - Net

                                                              30 September/                  31 Desember/
                                                            September 30, 2024            December 31, 2023*)
                                                                   Rp                             Rp
      Pihak Berelasi                                                                                                                                 Related Parties
      Piutang Usaha Jasa Konstruksi - Bersih                     1.794.672.978.577             1.322.506.646.292               Construction Service Receivables - Net
      Dikurangi: Aset Keuangan                                                                                                                 Less: Financial Asset
       Saling Hapus                                              (358.766.136.453)             (358.766.136.453)                                             Offset
      Piutang Dagang - Bersih                                      500.475.564.594               326.551.806.285                             Trade Receivables - Net
      Sub Jumlah                                                 1.936.382.406.718             1.290.292.316.124                                              Sub Total
      Pihak Ketiga                                                                                                                                     Third Parties
      Piutang Usaha Jasa Konstruksi - Bersih                      346.027.748.342               429.818.365.732                Construction Service Receivables - Net
      Piutang Dagang - Bersih                                     133.103.389.811               193.573.139.280                              Trade Receivables - Net
      Piutang Sewa                                                 18.275.540.141                 6.672.156.663                                     Rent Receivables
      Sub Jumlah                                                  497.406.678.294               630.063.661.675                                               Sub Total
      Jumlah                                                     2.433.789.085.012             1.920.355.977.799                                                   Total
      *) Direklasifikasi pada Catatan 61                                                                                                    *) As reclassified in Note 61

     Rincian saldo piutang usaha jasa konstruksi lancar                                    The details of current                      construction        service
     adalah sebagai berikut:                                                               receivables are as follows:
                                                                                                            30 September/                       31 Desember/
                                                                                                          September 30, 2024                 December 31, 2023*)
                                                                                                                 Rp                                  Rp
      Pihak Berelasi/ Related Parties
      PT Kresna Kusuma Dyandra Marga                                                                                422.917.218.554                    422.917.218.554
      PT Hutama Karya (Persero)                                                                                     382.561.356.188                    380.470.234.363
      PT Cimanggis Cibitung Tollways                                                                                364.110.898.900                    256.912.360.134
      PT Hutama Marga Waskita                                                                                       292.252.828.556                      7.271.639.268
      PT Citra Karya Jabar Tol                                                                                      235.454.545.455                    235.454.545.455
      PT Perusahaan Listrik Negara (Persero)                                                                        152.563.133.863                      3.985.025.031
      PT Kertas Leces (Persero)                                                                                      68.612.544.049                     68.612.544.049
      PT Istaka Karya (Persero)                                                                                      28.506.203.880                     28.506.203.880
      PT Dok dan Perkapalan Kodja Bahari (Persero)                                                                   26.260.305.600                     26.260.305.600
      PT Patra Jasa                                                                                                   7.169.390.211                     26.477.868.424
      PT Bukit Asam (Persero) Tbk                                                                                     1.036.426.967                     44.556.819.459
      Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                     86.888.999.391                     77.908.139.333
      Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
       Less: Allowance For Impairment Expected Credit of Account Receivables                                       (273.660.873.037)                 (256.826.257.258)
      Jumlah Pihak Berelasi/ Total Related Parties                                                                 1.794.672.978.577                 1.322.506.646.292
      Pihak Ketiga/ Third Parties
      Kementerian Pekerjaan Umum dan Perumahan Rakyat/
       The Ministry of Public Works and Housing                                                                     259.794.536.250                    213.120.376.416
      PT Broadbiz Asia                                                                                              116.422.545.443                    116.422.545.443
      PT Trikarya Graha Utama                                                                                       101.166.403.420                    101.166.403.420




                                                                              - 68 -
Page 72
PT WASKITA KARYA (PERSERO) Tbk                                                                           PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                               FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                         FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                               ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                       AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                (Expressed in Rupiah, unless otherwise stated)

                                                                                                              30 September/                       31 Desember/
                                                                                                            September 30, 2024                 December 31, 2023*)
                                                                                                                   Rp                                  Rp

        PT Bangun Investa Graha                                                                                         94.982.114.418                   94.982.114.418
        Pemerintah Daerah/ District Governments                                                                         50.710.681.966                   59.494.742.776
        Bin Ladin Contractor Group LLC                                                                                  48.511.061.259                   53.000.910.398
        The Special Administrative Region of Oenuno - Timor Leste                                                       47.330.502.163                   21.098.152.608
        PT Royal Abadi Dentalindo                                                                                       29.874.995.376                   30.025.495.376
        Crown Prince Court                                                                                               3.916.436.225                   24.759.737.309
        Kementerian Agama/ The Ministry of Religious Affairs                                                                         --                  29.029.572.215
        Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                     172.737.846.361                  236.566.405.529
        Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
         Less: Allowance For Impairment Expected Credit of Account Receivables                                        (579.419.374.539)                (549.848.090.176)
        Jumlah Pihak Ketiga/ Total Third Parties                                                                       346.027.748.342                  429.818.365.732
        *) Direklasifikasi pada Catatan 61                                                                                                   *) As reclassified in Note 61


   Rincian saldo piutang dagang - bersih sebagai                                           The details of trade receivables - net are as follows:
   berikut:

                                                                                                                      30 September/              31 Desember/
                                                                                                                    September 30, 2024         December 31, 2023
                                                                                                                           Rp                         Rp
        Pihak Berelasi/ Related Parties
         PT Kresna Kusuma Dyandra Marga                                                                                  441.399.849.723             375.779.270.492
         PT Cimanggis Cibitung Tollways                                                                                  252.222.970.055             130.932.551.379
         PT Hakaaston                                                                                                     69.043.190.556              75.088.280.446
         Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                                       232.319.524.256             197.108.104.333
         Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Dagang/
          Less: Allowance For Impairment Expected Credit of Trade Receivables                                           (494.509.969.996)           (452.356.400.365)
        Sub Jumlah/ Sub Total                                                                                             500.475.564.594             326.551.806.285
        Pihak Ketiga/ Third Parties
         PT Semutama Langgeng                                                                                            435.000.000.000            435.000.000.000
         Pelanggan dari/ Customer from Solterra                                                                           40.729.811.639             32.465.345.534
         KSO/ JO RDMP Balikpapan                                                                                          26.839.562.704             26.839.562.704
         Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                                       267.476.172.222            292.889.030.215
         Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Dagang/
          Less: Allowance For Impairment Expected Credit of Trade Receivables                                          (636.942.156.754)           (593.620.799.173)
        Sub Jumlah/ Sub Total                                                                                            133.103.389.811            193.573.139.280
        Jumlah/ Total                                                                                                    633.578.954.405            520.124.945.565


   b.      Piutang Usaha Tidak Lancar - Bersih                                            b.       Non Current Account Receivable - Net

   Rincian saldo piutang usaha tidak lancar adalah                                         The details of non-current accounts receivables
   sebagai berikut:                                                                        balance are as follows:


                                                                                                              30 September/                      31 Desember/
                                                                                                            September 30, 2024                 December 31, 2023
                                                                                                                   Rp                                 Rp
        Pihak Berelasi/ Related Parties
        PT Trans Jabar Tol                                                                                            1.380.954.980.575                                  --
        Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
         Less: Allowance For Impairment Expected Credit of Account Receivables                                          (2.525.934.001)                                  --
        Jumlah/ Total                                                                                                 1.378.429.046.574                                  --


   Mutasi penyisihan kerugian penurunan nilai piutang                                      The movements in allowance for impairment losses
   usaha jasa konstruksi adalah sebagai berikut:                                           on construction service receivables are as follows:
                                                                30 September/              31 Desember/
                                                              September 30, 2024         December 31, 2023
                                                                     Rp                         Rp
        Saldo Awal                                                (806.674.347.434)            (717.746.215.014)                                      Beginning Balance
        Penambahan PSAK 71 Periode Berjalan                        (76.524.133.944)             (85.875.336.833)                   Addition of PSAK 71 for Current Period
        Pemulihan PSAK 71 Periode Berjalan                           30.118.233.802               80.057.641.530                  Recovery of PSAK 71 for Current Period
        Pelepasan Entitas Anak                                      (2.525.934.001)                            --                              Divestment of Subsidiaries
        Reklasifikasi                                                             --            (83.110.437.117)                                         Reclassification

        Saldo Akhir                                               (855.606.181.577)            (806.674.347.434)                                         Ending Balance



                                                                                - 69 -
Page 73
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)

   Manajemen        berpendapat    bahwa     cadangan                                 The management believes that allowance for
   penurunan nilai piutang usaha jasa konstruksi                                      impairment losses on construction service
   adalah cukup untuk menutupi kerugian yang                                          receivables is sufficient to cover the possible losses
   mungkin timbul dari tidak tertagihnya piutang                                      on uncollectible receivables. The management also
   tersebut. Manajemen juga berpendapat bahwa tidak                                   believes that there is no significant risk
   terdapat risiko yang terkonsentrasi secara signifikan                              concentration of credit risk on accounts receivable
   atas piutang usaha pada satu pelanggan.                                            from one single customer.

   Mutasi penyisihan kerugian penurunan nilai piutang                                 The movements in allowance for impairment losses
   dagang adalah sebagai berikut:                                                     on trade receivables are as follows:
                                                          30 September/               31 Desember/
                                                        September 30, 2024          December 31, 2023
                                                               Rp                          Rp

     Saldo Awal                                            (1.045.977.199.538)         (1.152.871.048.895)                        Beginning Balance
     Pemulihan PSAK 71 Periode Berjalan                         82.349.877.954             196.690.767.829     Recovery of PSAK 71 for Current Period
     Penambahan PSAK 71 Periode Berjalan                     (167.824.805.166)           (188.978.355.677)      Addition of PSAK 71 for Current Period
     Reklasifikasi                                                           --             99.181.437.205                            Reclassification
     Saldo Akhir                                           (1.131.452.126.750)         (1.045.977.199.538)                            Ending Balance


   Analisa piutang usaha berdasarkan umur adalah                                      The analysis of accounts receivable based on age
   sebagai berikut:                                                                   are as follow:

                                                          30 September/               31 Desember/
                                                        September 30, 2024          December 31, 2023
                                                               Rp                          Rp

     0 - 3 bulan                                            3.004.289.559.590          2.355.034.496.564                                 0 - 3 Months
     > 3 - 12 Bulan                                         1.399.568.907.681            112.175.545.994                              >3 - 12 Months
     > 12 - 24 Bulan                                          112.862.811.306             29.671.087.229                             >12 - 24 Months
     > 24 - 36 Bulan                                           25.914.505.224            675.911.699.653                             >24 - 36 Months
     > 36 Bulan                                             1.256.640.656.112            600.214.695.331                                 >36 Months
     Jumlah                                                 5.799.276.439.913          3.773.007.524.771                                        Total



   Piutang usaha dijaminkan pada bank-bank pemberi                                    Account receivables are pledge as a collateral for
   pinjaman jangka panjang, dengan rincian sebagai                                    long-term   bank    loans,   with   details    as
   berikut:                                                                           follows:

           Nama Bank                               Piutang Usaha Dijaminkan pada Proyek-Proyek/                                 Nominal/
           Bank Name                                  Accounts Receivable Pledged on Projects                                   Nominal

   PT Bank Negara Indonesia                Proyek Paket 1 Transmisi 500 KV: New Aur Duri - Peranap (Atas)                        392.136.720.572
    (Persero) Tbk                          Proyek Paket 2 Trans. 500 KV: Peranap - Perawang (Atas)                               166.876.533.571
                                           Proyek Paket 1 Transmisi 500 KV: New Aur Duri - Peranap (Pondasi)                      36.814.806.140
                                           Proyek Paket 2 Trans. 500 KV: Peranap - Perawang (Pondasi)                             26.719.487.375
                                           Proyek Bendungan Jlantah                                                               73.415.912.835
                                           Proyek Jalan Tol Jakarta - Cikampek II Sisi Selatan - Induk                         1.312.249.156.836
                                           Proyek Jalan Tol Jakarta - Cikampek II Sisi Selatan - Peralatan                        10.253.234.179
                                           Proyek Jalan Tol Prabumulih - Muara Enim                                               19.010.198.413
                                           Proyek Pembangunan Jalan Tol Cibitung - Cilincing                                     543.132.874.212

   PT Bank Mandiri                         Kawasan Industri Sadai                                                                 13.892.121.400
    (Persero) Tbk                          TOL JAKARTA - CIKAMPEK II ELEVATED                                                     62.720.926.414
                                           TOL BECAKAYU SEKSI 2A                                                                 121.289.273.744
                                           TOL CIMANGGIS - CIBITUNG SEKSI 2                                                      743.946.354.980
                                           Tol Ruas Pematang Panggang-Kayu Agung (seksi 3)                                        14.916.472.468
                                           Rest Area Bakter Paket 2                                                               15.018.978.636
                                           Crossing PT. Multi Optima Sentosa                                                       3.115.061.909
                                           Rentang Irrigation Modernization Project                                               48.828.525.909
                                           Jalan Tol Kayu Agung-Palembang-Betung Paket I Seksi 1A                              1.089.017.601.000

                                           Jalan Tol Kayu Agung-Palembang-Betung Paket I Seksi 1b                                570.893.009.427
                                           Jembatan Musi - Kapal Betung                                                          506.803.211.569
                                           Jembatan Kramasan - Kapal Betung                                                      445.196.463.277




                                                                           - 70 -
Page 74
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

           Nama Bank                    Piutang Usaha Dijaminkan pada Proyek-Proyek/                    Nominal/
           Bank Name                       Accounts Receivable Pledged on Projects                      Nominal
   PT Bank Rakyat Indonesia    Bandara Depati Amir                                                        36.224.010.915
    (Persero) Tbk              Tol Becakayu Seksi 2A Ujung                                               186.781.629.022
                               TOL BECAKAYU KONEKSI WIYOTO WIYONO                                        157.870.486.589
                               MRMP Subang                                                                 7.957.150.565
                               WWTP Jambi                                                                  1.381.037.426
                               Jalan Tol Kayu Agung-Palembang-Betung IV (Seksi 2A)                        96.535.240.128
                               Jln Tol Terbanggi Besar - Kayu Agung (Zona KLB- 2)                        129.527.863.157
                               Jln Tol Terbanggi - Pematang Panggang (VGF Cisumdawu)                     331.818.181.818
                               Tol Terbanggi Besar - Kayu Agung (Zona KLB 1)                             110.617.880.130
                               Apartemen Solterra                                                        169.665.062.718
                               Jalan Tol Kayu Agung-Palembang-Betung Paket II Seksi 2a                   781.958.527.000

   PT Bank Syariah             Apartemen Yukata Alam Sutera                                               31.855.680.790
   Indonesia Tbk               Nines Plaza & Residence                                                   226.268.952.034
                               Apartemen Solterra                                                        169.665.062.718
                               Terminal Bandara Internasional Minangkabau                                 29.377.095.881
                               Bandara Depati Amir                                                        36.224.010.915
                               Pkt. 1 Trans. 500 KV : New Aur Duri-Peranap (Atas)                        392.136.720.572
                               Pkt. 2 Trans. 500 KV : Peranap - Perawang (Tanah)                           9.334.578.625
                               SUTT 150 kV Sangatta - Maloy Section 3                                      9.135.109.196
                               Pemb. Gardu Induk Tegangan Ekstra Tinggi 500 KV Peranap (46%)              27.768.349.081
                               TOL JAKARTA - CIKAMPEK II ELEVATED                                         62.720.926.414
                               TOL BECAKAYU SEKSI 2A                                                     121.289.273.744
                               TOL BECAKAYU KONEKSI WIYOTO WIYONO                                        157.870.486.589
                               TOL JAKARTA - CIKAMPEK II SISI SELATAN-INDUK                            1.312.249.156.836
                               TOL CIMANGGIS - CIBITUNG SEKSI 2                                          743.946.354.980
                               Tol Becakayu Seksi 2A Ujung                                               186.781.629.022
                               Underpass MM2100 - Cibitung                                                 3.135.000.001
                               Jln Tol Terbanggi - Pematang Panggang (VGF JJS 1)                          70.654.401.064
                               Jln Tol Terbanggi - Pematang Panggang (VGF JJS 2)                          90.659.605.938
                               Rest Area Bakter Paket 2                                                   15.018.978.636
                               Bendungan Jlantah (65%)                                                    73.415.912.835
                               Bendungan Bener Paket II (100%)                                            68.648.422.072
                               Bendungan Rukoh                                                           151.369.148.639
                               Jalan Tol Pasuruan - Probolinggo (General)                                 79.972.476.773
                               Jalan Tol Pasuruan - Probolinggo (Seksi 2)                                 34.122.500.372
                               Jalan Tol KLBM Seksi 1                                                    217.110.434.443
                               Jalan Tol KLBM Seksi 2                                                    164.710.393.607
                               Jalan Tol Ruas Colomadu - Karanganyar                                         530.074.185
                               Bendungan Jragung Paket 1                                                 102.261.830.278
                               TOL CIAWI - SUKABUMI SEKSI 2                                            1.408.988.320.575
                               Tol Kuala Tanjung - Inderapura (Zona 2)                                    33.202.143.934
                               Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1)                           67.342.261.136
                               Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1A)                          84.254.191.935
                               Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 2)                           57.492.666.523
                               Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 3)                           61.560.626.063
                               Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 4)                          109.372.813.981
                               Jalan Tol Kayu Agung-Palembang-Betung Paket I Seksi 1A                  1.089.017.601.000
                               Jalan Tol Kayu Agung-Palembang-Betung II (Seksi 1 / Induk)              3.325.917.209.320
                               Jalan Tol Kayu Agung-Palembang-Betung II (Seksi 2)                      1.646.239.879.277
                               Jalan Tol Kayu Agung-Palembang-Betung IV (Seksi 2A)                        96.535.240.128
                               Jembatan Ogan - Kapal Betung                                            1.264.362.283.911
                               Pabrik Baja WKI Cikande - Serang                                           13.709.293.296
                               TOL CIBITUNG - CILINCING SEKSI 1                                          362.593.619.405
                               TOL CIBITUNG - CILINCING SEKSI 2                                          180.539.254.807

   PT Bank Pan Indonesia       Proyek Pembangunan Jalan Tol Kayu Agung - Palembang - Betung            1.646.239.879.277
   Tbk                         Paket II seksi 2
                               Proyek Junction Tebing Tinggi                                               7.337.752.527

   PT Bank Pembangunan         Proyek Jalan Tol Ciawi - Sukabumi Seksi 2                               1.408.988.320.575
   Daerah Jawa Barat dan
   Banten Tbk

   PT Bank UOB Indonesia       Proyek Tol Kuala Tanjung - Inderapura (Zona 1)                            33.078.664.112
                               Proyek Tol Kuala Tanjung - Inderapura (Zona 2)                            33.202.143.934
                               Proyek TPA Sampah Regional Manado Minahasa                                12.346.443.758




                                                            - 71 -
Page 75
PT WASKITA KARYA (PERSERO) Tbk                                                                          PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                      AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                              FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                        FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                              ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                      AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                               (Expressed in Rupiah, unless otherwise stated)

             Nama Bank                                 Piutang Usaha Dijaminkan pada Proyek-Proyek/                                  Nominal/
             Bank Name                                    Accounts Receivable Pledged on Projects                                    Nominal

     PT Bank BTPN Tbk                         Proyek Jembatan Jalan Tol Kapal Betung (Ogan)                                          1.264.362.283.911

     PT Bank Maybank                          Proyek Bendungan Rukoh Paket II                                                         151.369.148.639
     Indonesia Tbk

     Bank of China Ltd                        Proyek GI. PLTU Kaltim - GI. New Balikpapan 150KV                                         3.902.194.105
                                              Proyek Terminal Bandara Internasional Minangkabau                                        29.377.095.881
                                              Proyek SUTT 150 KV Sangatta - Maloy seksi 2                                               6.577.557.863

     PT Bank BNP Paribas                      Proyek Jalan Tol KAPB Paket IV Seksi 3B                                                  76.609.516.590
     Indonesia                                Proyek Gardu Induk Tegangan Ekstra Tinggi 500 KV Peranap (46%)                           27.768.349.081

     Sindikasi PT Bank BTPN                   Jalan Tol Kayu Agung-Palembang-Betung II (Seksi 1 / Induk)                             3.325.917.209.320
     Tbk, Bank of China (Hong
     Kong) Limited Jakarta
     Branch, PT Bank KEB
     Hana Indonesia, PT Bank
     Permata Tbk, PT Bank
     OCBC NISP Tbk, PT Bank
     China Construction Bank
     Indonesia Tbk, PT Bank
     CTBC Indonesia, PT Bank
     Shinhan Indonesia, PT
     Bank SBI Indonesia

     Sindikasi PT Bank BTPN                   Proyek Jln Tol Tebing Tinggi - Parapat tahap 1                                           67.342.261.136
     Tbk, PT Bank Permata Tbk,                Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 1A)                                 84.254.191.935
     PT Bank Resona Perdania,                 Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 2)                                  57.492.666.523
     PT Bank Shinhan                          Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 3)                                  61.560.626.063
     Indonesia, PT Bank QNB                   Proyek Jln Tol Tebing Tinggi - Parapat tahap 1 (Zona 4)                                 109.372.813.981
     Indonesia                                Proyek Nines Plaza dan Residence                                                        226.268.952.034


8.   PIUTANG VENTURA BERSAMA                                                       8.     JOINT VENTURES RECEIVABLES
                                                                                                                30 September/          31 Desember/
                       Kemitraan/                                         Nama Proyek/                        September 30, 2024     December 31, 2023
                        Venturer                                          Project Name                               Rp                     Rp


      Waskita - Sumber Mitra Jaya - Pijar Utama    APBD Sumut Zona 1                                                38.846.581.994         27.502.743.720
      Waskita - Adhi                               Bendungan Rukoh Paket II                                         37.360.503.768         22.700.844.845
      Waskita - Arkitek Team Empat                 Revitalisasi Pusat Olahraga Ragunan                              30.952.125.046         74.280.398.055
      PP - Waskita - Wika                          Jalan Tol Probolinggo-Banyuwangi Paket 3                         26.394.468.275          2.285.750.245
      Waskita - Adhi                               Bendungan Jlantah (65%)                                          22.387.981.982         17.224.402.401
      Waskita - Nindya - LRS                       LRT Jakarta                                                      10.590.040.730         31.387.433.905
      Lain-lain/ Others
       (di bawah/ below Rp 20 Milyar/ Billion )                                                                    207.156.615.502        185.359.852.964
      Jumlah/Total                                                                                                 373.688.317.297        360.741.426.135



     Piutang ventura bersama merupakan pinjaman dan                                       Joint venture receivables represent loan and
     biaya ventura bersama yang dibayarkan terlebih                                       advance payment of joint venture’s expenses paid
     dahulu oleh Grup.                                                                    by the Group.

     Piutang ventura bersama tidak dikenakan bunga.                                       Joint venture receivables were not subjected to
                                                                                          interest..

     Manajemen berpendapat bahwa piutang ventura                                          Management believes that balances of joint venture
     bersama dapat ditagihkan.                                                            receivables on demand.

     Tidak memerlukan cadangan penurunan nilai, sebab                                     No allowance for impairment loss was provided as
     manajemen berpendapat bahwa piutang ventura                                          management believes that balances of joint venture
     bersama dapat ditagihkan.                                                            receivables are collectible.




                                                                               - 72 -
Page 76
PT WASKITA KARYA (PERSERO) Tbk                                                                           PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                               FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                         FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                               ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                       AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                (Expressed in Rupiah, unless otherwise stated)

9.     ‘
     PIUTANG RETENSI - BERSIH                                                        9.     RETENTION RECEIVABLES - NET

     a.      Piutang Retensi Lancar - Bersih                                              a.       Current Retention Receivable - Net
                                                               30 September/                31 Desember/
                                                             September 30, 2024           December 31, 2023
                                                                    Rp                           Rp
          Pihak Berelasi                                        1.769.012.052.516           1.792.990.908.773                                       Related Parties
          Dikurangi: Aset Keuangan                                                                                                            Less: Financial Asset
           Saling Hapus                                          (579.032.019.184)             (579.032.019.184)                                            Offset
          Sub Jumlah                                            1.189.980.033.332           1.213.958.889.589                                            Sub Total
          Pihak Ketiga                                            271.364.856.313              276.308.727.097                                        Third Parties
          Sub Jumlah                                              271.364.856.313              276.308.727.097                                           Sub Total
          Jumlah                                                1.461.344.889.645           1.490.267.616.686                                                Total


     Rincian saldo piutang retensi lancar adalah sebagai                                    The details of current retention receivables are as
     berikut:                                                                               follows:

                                                                                                                     30 September/            31 Desember/
                                                                                                                   September 30, 2024       December 31, 2023
                                                                                                                          Rp                       Rp
          Pihak Berelasi/ Related Parties
           PT Hutama Karya (Persero)                                                                                    613.061.196.233          613.061.196.233
           PT Cibitung Tanjung Priok Port Tollways                                                                      416.440.636.681          413.931.960.528
           PT Jasamarga Japek Selatan                                                                                   306.818.502.998          306.818.502.998
           PT Cimanggis Cibitung Tollways                                                                               213.856.399.375          190.690.282.703
           PT Jasamarga Jalan Layang Cikampek                                                                            74.120.222.778           73.996.549.100
           PT Kresna Kusuma Dyandra Marga                                                                                71.938.039.640           72.734.427.122
           PT Angkasa Pura II (Persero)                                                                                  23.446.264.110           23.055.357.030
           PT Jasamarga Solo Ngawi                                                                                          530.074.185           35.972.307.716
           PT Marga Trans Nusantara                                                                                                   --          33.985.678.043
           Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                    80.415.672.289           55.867.595.826
           Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Retensi/
            Less: Allowance For Impairment Expected Credit of Retention Receivables                                     (31.614.955.773)         (27.122.948.526)
          Jumlah Pihak Berelasi/ Total Related Parties                                                                1.769.012.052.516        1.792.990.908.773

          Pihak Ketiga/ Third Parties
           Kementerian Pekerjaan Umum dan Perumahan Rakyat/
            The Ministry of Public Works and Housing                                                                    164.877.507.174          162.360.143.800
           Ministry of Public Works of the Democratic Republic of Timor Leste                                            62.532.422.032           62.532.406.615
           PT Pardika Wisthi Sarana                                                                                      23.431.420.350           23.431.420.350
           Ministry of Transport and Communication of the Democratic Republic of Timor Leste                             22.962.827.497           22.962.827.497
           Pemerintah Daerah/ District Governments                                                                       22.395.035.710           23.017.222.241
           Bin Ladin Contractor Group LLC                                                                                22.267.480.770           27.707.741.349
           The Special Administrative Region of Oenuno - Timor Leste                                                     21.605.860.250           17.978.047.629
           Crown Prince Court                                                                                            13.995.474.999           31.423.749.999
           Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                   127.355.302.721          123.388.613.595
           Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Retensi/
            Less: Allowance For Impairment Expected Credit of Retention Receivables                                    (210.058.475.190)       (218.493.445.978)
          Jumlah Pihak Ketiga/ Total Third Parties                                                                      271.364.856.313          276.308.727.097


     b.      Piutang Retensi Tidak Lancar - Bersih                                        b.       Non – Current Retention Receivable - Net

     Rincian saldo piutang retensi tidak lancar adalah                                      The details of non – current account retention
     sebagai berikut:                                                                       receivables are as follows:

                                                                                                                     30 September/            31 Desember/
                                                                                                                   September 30, 2024       December 31, 2023
                                                                                                                          Rp                       Rp
          Pihak Berelasi/ Related Parties
          PT Trans Jabar Tol                                                                                             153.473.954.296                              --
          Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Usaha/
           Less: Allowance For Impairment Expected Credit of Account Receivables                                          (9.339.127.806)                             --
          Jumlah/ Total                                                                                                  144.134.826.490                              --




                                                                              - 73 -
Page 77
PT WASKITA KARYA (PERSERO) Tbk                                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                          (Expressed in Rupiah, unless otherwise stated)


   Mutasi penyisihan kerugian penurunan nilai piutang                                  The movements in allowance for impairment losses
   retensi adalah sebagai berikut:                                                     on retention receivables are as follows:

                                                           30 September/                 31 Desember/
                                                         September 30, 2024            December 31, 2023
                                                                Rp                            Rp

     Saldo Awal                                                (245.616.394.504)             (329.265.186.647)                              Beginning Balance
     Penambahan PSAK 71 Periode Berjalan                        (18.654.380.357)              (41.230.005.911)           Addition of PSAK 71 for Current Period
     Pemulihan PSAK 71 Periode Berjalan                           21.514.979.460               126.878.798.054          Recovery of PSAK 71 for Current Period
     Pelepasan Entitas Anak                                      (8.256.763.368)                             --                      Divestment of Subsidiaries
     Reklasifikasi                                                             --               (2.000.000.000)                                Reclassification
     Saldo Akhir                                               (251.012.558.769)             (245.616.394.504)                                 Ending Balance



   Manajemen       berpendapat    bahwa    penyisihan                                  The management believes that allowance for
   kerugian penurunan nilai piutang retensi adalah                                     impairment losses on retention receivables is
   cukup     untuk    menutupi    kemungkinan    tidak                                 sufficient to cover the possible losses on
   tertagihnya piutang retensi di kemudian hari.                                       the uncollectible retention receivables in the future.
   Manajemen juga berpendapat bahwa tidak terdapat                                     The management also believes that there is no
   risiko yang terkonsentrasi secara signifikan atas                                   significant concentration of credit risk on retention
   piutang retensi pada satu pelanggan.                                                receivables from one single customer.

10. PIUTANG LAIN-LAIN - BERSIH                                                   10. OTHER RECEIVABLE - NET

   a.   Piutang lain-lain lancar - bersih                                              a.     Other current receivables - net


                                                                                                               30 September/              31 Desember/
                                                                                                             September 30, 2024         December 31, 2023
                                                                                                                    Rp                         Rp

           Pihak Berelasi/ Related Parties
            KSO/JO WKR - Asiana Senopati                                                                           345.351.232.877           300.677.369.863
            KSO/JO WKR - Darmo Permai                                                                              335.304.945.568           326.657.423.641
            PT Jasamarga Solo Ngawi                                                                                 22.720.159.494            22.720.159.494
            KSO/JO Waskita - Vision First                                                                            2.018.427.101            35.304.489.716
            PT Asuransi Jiwasraya (Persero)                                                                                      --          185.576.124.289
            Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                               93.606.782.455           141.882.840.733
            Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Lain-lain/
             Less: Allowance For Expected Credit of Other Receivables                                              (43.417.690.447)          (43.417.690.447)
           Sub Jumlah/ Sub Total                                                                                   755.583.857.048           969.400.717.289
           Pihak Ketiga/ Third Parties
            PT Prima Indonesia Logistik                                                                            218.705.246.909             1.931.150.000
            PT Yasa Patria Perkasa                                                                                  71.385.827.659            66.648.296.573
            Lembaga Manajemen Aset Negara                                                                           42.722.604.481            48.340.410.792
            PT Persada Tanjung Api-Api                                                                              29.700.000.000                         --
            Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                                8.652.871.769             2.106.498.556
            Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Piutang Lain-lain/
             Less: Allowance For Expected Credit of Other Receivables                                              (65.814.988.832)          (66.266.924.246)
           Sub Jumlah/ Sub Total                                                                                    305.351.561.986           52.759.431.675
           Jumlah/ Total                                                                                          1.060.935.419.034        1.022.160.148.964



        KSO WKR - Asiana Senopati                                                       KSO WKR - Asiana Senopati
        Pada tanggal 11 April 2019, Perusahaan                                          On April 11, 2019, the Company entered into final
        membuat perjanjian pengakhiran kerja sama                                       joint operation agreement with PT Asiana Senopati
        operasi dengan PT Asiana Senopati atas Proyek                                   regarding project KSO WKR-Asiana Senopati
        KSO WKR-Asiana Senopati dengan Akta                                             based on Notarial Deed No. 002 of Ariani L.
        Notaris oleh Ariani L. Rachim No. 002 tanggal                                   Rachim dated December 12, 2019 where in both
        12 Desember 2019 dan menyetujui hak dan                                         parties agreed to return each of their investment to
        kewajibannya        untuk      mengembalikan                                    PT Asiana Senopati to disclaim its obligation to
        investasinya masing-masing dan PT Asiana                                        WKR.
        Senopati mengakui utang atas pengembalian
        investasi WKR.



                                                                             - 74 -
Page 78
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)


        KSO WKR - Darmo Permai                                     KSO WKR - Darmo Permai

        Merupakan piutang terhadap KSO WKR -                       Represent receivable from KSO WKR - Darmo
        Darmo Permai sebesar Rp172.500.000.000                     Permai amounting to Rp172,500,000,000 based on
        berdasarkan perjanjian No. 003/P. WKR/2017,                agreement No. 003/P.WKR/2017, where in
        Perusahaan juga mempunyai hak pengembalian                 the Company has right to reimburs of VAT for
        uang atas penyetoran PPN Masukan pada saat                 acquisition of land by the Company behalf of
        akuisisi tanah Perusahaan ke KSO sebesar                   the joint venture amounting to Rp21,731,737,500,
        Rp21.731.737.500 dan penggantian biaya                     and reimbursement of operational expense of KSO
        operasional KSO WKR - Darmo permai.                        WKR - Darmo Permai.

        PT Prima Indonesia Logistik (IPL)                          PT Prima Indonesia Logistik (IPL)

        Sehubungan dengan penyelesaian perkara                     There is a resolution of case No. 25/VII/ARB-
        No. 25/VII/ARB-BANIPLG/2023 antara WST                     BANIPLG/2023 between WST and IPL, where WST
        melawan IPL, dimana WST akan menagihkan                    will collect receivables arising in connection with
        piutang yang timbul berkaitan dengan surat                 letter No. 23/61/VIII/BANI-PLG/HT dated August
        No. 23/61/VIII/BANI-PLG/HT tanggal 29 Agustus              29, 2023 to IPL amount to Rp1,931,150,000. Apart
        2023 kepada IPL sebesar Rp1.931.150.000.                   from that, based on decision No. 25/VII/ARB-
        Selain itu berdasarkan putusan No. 25/VII/ARB-             BANIPLG/2023 from the Indonesian National
        BANIPLG/2023 dari Badan Arbitrase Nasional                 Arbitration Board which was read on June 10,
        Indonesia yang dibacakan pada tanggal 10 Juni              2024, stated that IPL was obliged to return
        2024, menyatakan bahwa IPL diwajibkan untuk                the remaining unused compensation money for
        melakukan pengembalian atas sisa uang ganti                land acquisition amounting to Rp218,705,246,909.
        rugi yang belum dimanfaatkan atas pembebasan
        lahan sebesar Rp218.705.246.909.

        PT Yasa Patria Perkasa                                     PT Yasa Patria Perkasa

        Berdasarkan perjanjian No. 06/Kontrak-S1-                  Based on Agreement No. 06/Kontrak-S1-C/2015
        C/2015 tanggal 23 November 2015, yang telah                dated November 23, 2015, which was amended by
        diubah       dengan        kontrak        No.              contract No. 023/ADD/KONTRAK-S1-C/2016 dated
        023/ADD/KONTRAK-S1-C/2016         tanggal    1             September 1, 2016, the Company appointed PT
        September 2016, Perusahaan menunjuk PT                     Yasa Patria Perkasa as the contractor for land
        Yasa Patria Perkasa sebagai kontraktor untuk               structure work of Section 1- C: Sta 9+000 - Sta
        melaksanakan pekerjaan struktur tanah Seksi 1-             13+400 of Kayuagung- Palembang-Betung toll road
        C: Sta 9+000 - Sta 13+400 ruas jalan tol                   with      contract   value      amounting    to
        Kayuagung- Palembang-Betung dengan dengan                  Rp398,521,411,000 (including VAT).
        nilai kontrak sebesar Rp398.521.411.000
        (termasuk PPN).

        Berdasarkan perjanjian No.01/KONTRAK.S1-                   Based on Agreement No. 01/KONTRAK.S1A .B.C-
        A.B.CYPP/2016 tanggal 24 Februari 2016,                    YPP/2016       dated     February     24,      2016,
        Perusahaan menunjuk PT Yasa Patria Perkasa                 the Company appointed PT Yasa Patria Perkasa
        sebagai    kontraktor  untuk      melaksanakan             the contractor for land structure work of section 1-
        pekerjaan struktur tanah Seksi 1-A.B.C: Sta.               A.B.C: Sta 00+000 - Sta. 13+400 of Kayuagung -
        00+000 - Sta. 13+400 ruas jalan tol Kayuagung -            Palembang - Betung toll road with contract value
        Palembang -Betung dengan dengan nilai                      amounting to Rp554,410,156,000 (including VAT).
        kontrak sebesar Rp554.410.156.000 (termasuk
        PPN).

        Berdasarkan addendum kontrak No. 19/ADD/                   Based         on      contract       amendment
        KONTRAK-YPP/2021 tanggal 5 November                        No.       19/ADD/KONTRAK-YPP/2021          dated
        2021, Perusahaan menunjuk PT Yasa Patria                   November 5, 2021, the Company appointed PT
        Perkasa sebagai kontraktor untuk melaksanakan              Yasa Patria Perkasa the contractor for toll road
        pekerjaan pembangunan jalan tol Kayu Agung -               construction work Kayu Agung - Palembang -
        Palembang - Betung Sta. 90+690 - Sta. 97+000               Betung of Sta. 90+690 - Sta. 97+000 with contract
        dengan       nilai       kontrak      sebesar              value amounting to Rp617,073,963,000 (including
        Rp617.073.963.000                                          VAT).
        (termasuk PPN).


                                                          - 75 -
Page 79
PT WASKITA KARYA (PERSERO) Tbk                                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                           (Expressed in Rupiah, unless otherwise stated)

        Lembaga Manajemen Aset Negara                                                     Lembaga Manajemen Aset Negara
        Piutang lain-lain kepada Lembaga Manajemen                                        Other  current  receivables   from           Lembaga
        Aset Negara merupakan:                                                            Manajemen Aset Negara represent:
        1.     Piutang atas Dana Dukungan Pemerintah                                         1.   Receivables of Government Support Fund
               berdasarkan perjanjian Pengusahaan Jalan Tol                                       based      on   Concession    Agreement
               Ruas Jalan Pemalang - Batang sesuai akta                                           Pemalang - Batang Toll Road according to
               notaris No. 6 tanggal 31 Agustus 2018 dibuat                                       notarial deed No. 6 dated August 31, 2018
               dihadapan Notaris Rina Utami Djauhari, S.H.,                                       of notary Rina Utami Djauhari, S.H., with
               dengan jumlah dana pengadaan tanah yang                                            the total amount of land funds to be
               harus disediakan adalah maksimum sebesar                                           provided            maximum             is
               Rp1.400.000.000.000.                                                               Rp1,400,000,000,000.
        2.     Piutang atas Dana Dukungan Pemerintah                                         2.   Receivables from Government Support
               berdasarkan       Amandemen        Perjanjian                                      Funds based on the Amendment to
               Pengusahaan Jalan Tol Pasuruan - Probolinggo                                       the Pasuruan - Probolinggo (TJPJT) Toll
               (TJPJT) No. XI Sesuai Akta No. 31 tanggal 24                                       Road Concession Agreement No. XI In
               Januari 2023 dibuat dihadapan Notaris Rina                                         accordance with Deed no. 31 dated
               Utami Djauhari,S.H.                                                                January 24, 2023 made before Notary Rina
                                                                                                  Utami Djauhari, S.H.
        Piutang lain-lain ini dikenakan bunga berdasarkan BI                                  These other receivable bear interest based on
        7 days Repo Rate pada tanggal dimulainya                                              BI 7 days Repo Rate on the start date of
        perhitungan biaya dana.                                                               the calculation of the cost of funds.
        Grup membiayai terlebih dahulu kenaikan harga                                         The Group paid in advance the appreciation
        tanah  dan    selanjutnya  akan    mengajukan                                         price of land and subsequently will be
        permohonan dana kepada Pemerintah.                                                    reimbursed by the Government.
        PT Persada Tanjung Api-Api                                                            PT Persada Tanjung Api-Api
        Merupakan piutang yang timbul berdasarkan                                             Represents receivables arising based on BANI
        Putusan BANI No. 46029/VII/ARB-BANI2024                                               Decision No. 46029/VII/ARB-BANI2024 dated
        tanggal 16 Mei 2024 yang menyatakan bahwa                                             16 May 2024 which stated that the previous
        pemegang saham terdahulu salah satunya PT                                             shareholder, one of which was PT Persada
        Persada Tanjung Api-Api berkewajiban untuk                                            Tanjung Api-Api, was obliged to pay in cash the
        membayar secara tunai klaim dari PT Mitra Mandiri                                     claim from PT Mitra Mandiri Priharum in
        Priharum sesuai dengan Putusan Pengadilan Negeri                                      accordance with the Decision of the South
        Jakarta Selatan pada tanggal 29 Agustus 2019 yang                                     Jakarta District Court on 29 August 2019 which
        menyatakan bahwa Perusahaan wanprestasi dan                                           stated that the Company is in default and
        menghukum Perusahaan untuk membayar biaya                                             punishes the Company to pay costs amounting
        sebesar Rp33.000.000.000.                                                             to Rp33,000,000,000.

   b.   Piutang lain-lain tidak lancar – bersih                                           b. Other non-current receivables – net

                                                                                                           30 September/           31 Desember/
                                                                                                         September 30, 2024      December 31, 2023
                                                                                                                Rp                      Rp

             Pihak Berelasi/ Related Parties
              PT Kresna Kusuma Dyandra Marga                                                                4.276.175.133.611       4.094.055.382.677
              PT Cimanggis Cibitung Tollways                                                                2.930.434.627.032       2.757.897.298.764
              Lambaga Pengelola Investasi/ Indonesia Investment Authority                                   2.143.099.259.006       2.058.746.820.252
              PT Trans Jabar Tol                                                                              835.881.906.350                       --
              PT Istaka Karya (Persero)                                                                        74.914.307.748          74.914.307.748
              Lain-lain/ Others (dibawah/ below Rp 20 Milyar/ Billion )                                        8.690.350.500            9.009.648.886
             Dikurangi: Penyisihan Kerugian Penurunan Nilai Piutang Lain-lain/
               Less: Allowance for Losses of Other Receivables                                               (143.499.864.392)      (144.203.275.626)

             Jumlah/ Total                                                                                 10.125.695.719.855       8.850.420.182.701


        PT Kresna Kusuma Dyandra Marga (KKDM)                                                 PT Kresna Kusuma Dyandra Marga (KKDM)

        Piutang lain-lain kepada PT KKDM digunakan                                            Other receivable from PT KKDM was used for
        untuk kebutuhan investasi dan operasional.                                            the purpose of investment and operations.
        Pada tanggal 29 Desember 2022, WTR                                                    On December 29, 2022, WTR and PT KKDM

                                                                                 - 76 -
Page 80
PT WASKITA KARYA (PERSERO) Tbk                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                   (Expressed in Rupiah, unless otherwise stated)

        dan PT KKDM menandatangani Perjanjian                         entered into Shareholder Loan Facility
        Fasilitas   Pinjaman     Pemegang     Saham                   Agreement No. ADD/17.14/WTR/1222 with
        No. ADD/17.14/WTR/1222 dengan tingkat suku                    interest rates 12-12.65% per annum and will
        bunga sebesar 12-12,65% per tahun, dan akan                   be due on December 30, 2023.
        jatuh tempo pada tanggal 30 Desember 2023.

        Perjanjian fasilitas pinjaman pemegang saham                  Shareholder loan facility agreement for
        untuk kebutuhan investasi telah mengalami                     investing has been amended, most recently by
        perubahan terakhir berdasarkan addendum                       addendum No. ADD/08.22/WTR/0523 dated
        No. ADD/08.22/WTR/0523 tanggal 2 Mei 2023.                    May 2, 2023. The working capital loans bear
        Pinjaman tersebut dikenakan bunga 8,5% per                    an interest at 8.5% per annum and will be due
        tahun dan akan jatuh tempo pada tanggal 3 Mei                 on May 3, 2028.
        2028.

        PT Cimanggis Cibitung Tollways (CCT)                          PT Cimanggis Cibitung Tollways (CCT)

        Berdasarkan Perjanjian Fasilitas Pinjaman                     Based      on    Shareholder        Loan   Facility
        Pemegang Saham No. 6/FPPS/WTR/2016                            Agreement No. 6/FPPS/WTR/2016 dated May
        tanggal 24 Mei 2016, WTR memberikan                           24, 2016, WTR provided a loan to CCT
        pinjaman kepada CCT dengan nilai sebesar                      amounting         to       Rp1,036,287,057,882.
        Rp1.036.287.057.882. Pinjaman ini digunakan                   The purpose of the loan facility is for land
        untuk pembebasan tanah. Pinjaman ini                          acquisition. This credit facility is repayable in 6
        berjangka waktu 6 bulan sejak tanggal                         months from the date of drawdrown and bears
        pencairan pinjaman dan dikenakan bunga 9,5%                   interest of 9.5% per annum on a compounding
        per tahun dengan metode perhitungan                           interest method. On December 27, 2017,
        compound interest. Pada 27 Desember 2017,                     the CCT and WTR agreed to extend the loan
        CCT dan WTR setuju untuk melakukan                            agreement amounting to Rp4,530,551,044,573
        perpanjangan atas perjanjian pinjaman sebesar                 through Deed No. 33/ADD/FPPS/WTR/2017
        Rp4.530.551.044.573     melalui    Akta   No.                 bearing interest of Lembaga Penjamin
        33/ADD/FPPS/WTR/2017 dengan bunga yang                        Simpanan (LPS) + 1% per annum. According
        dikenakan     sebesar   Lembaga      Penjamin                 to the amendment No. ADD/21.5/WTR/1221
        Simpanan (LPS) + 1% per tahun. Sesuai                         dated December 29, 2021, the term of this
        addendum No. ADD/21.5/WTR/1221 tanggal 29                     agreement is valid until December 31, 2023.
        Desember 2021, masa berlaku perjanjian
        diperpanjang sampai dengan 31 Desember
        2023.

        Berdasarkan Fasilitas Pinjaman Pemegang                       Based     on    Shareholder Loan   Facility
        Saham No. 2/FPPS/WTR/2015 tanggal 11 Juli                     Agreement No. 2/FPPS/WTR/2015 dated July
        2015, WTR memberikan pinjaman dengan nilai                    11, 2015, WTR provided a loan to CCT
        sebesar    Rp1.043.842.500.  Pinjaman  ini                    amounting to Rp1,043,842,500. This loan is
        digunakan untuk operasional.                                  used for operations.

        Sesuai adendum No. ADD/09.2/ WTR/1222,                        According to amendment No. ADD/09.2/
        jangka waktu pinjaman ini berlaku sampai                      WTR/1222, the term of this agreement is valid
        dengan satu tahun setelah jalan tol beroperasi                until one year after toll road has been operated
        dan dikenakan bunga 17% per tahun.                            and bearing interest of 17% per annum.

        Perjanjian fasilitas pinjaman pemegang saham                  Shareholder loan facility agreement for
        untuk kebutuhan investasi telah mengalami                     investing has been amended, most recently by
        perubahan terakhir berdasarkan addendum                       addendum No. ADD/08.30/WTR/0523 dated
        No. ADD/08.30/WTR/0523 tanggal 3 Mei 2023.                    May 3, 2023. The working capital loans bear
        Pinjaman tersebut dikenakan bunga 9% per                      an interest at 9% per annum and will be due
        tahun dan akan jatuh tempo pada tanggal 3 Mei                 on May 3, 2028.
        2028.

        Lembaga Pengelola Investasi                                   Indonesia Investment Authority

        Berdasarkan PPJB dan Akta Novasi dengan                       Based on the PPJB and Deed of Novation with
        Lembaga Pengelola Investasi (LPI) dan PT                      the Indonesia Investment Authority (INA) and
        Waskita Transjawa Toll Road, pinjaman dari PT                 PT Waskita Transjawa Toll Road, the loan
        Waskita Transjawa Toll Road ke PT Pejagan                     from PT Waskita Transjawa Toll Road to PT
        Pemalang Tol Road dan PT Semesta Marga                        Pejagan Pemalang Tol Road and PT Semesta
                                                         - 77 -
Page 81
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

        Raya dinovasikan kepada LPI dengan bunga                       Marga Raya was novated to INA with interest
        sebesar 5,5% dan jangka waktu pembayaran                       of 5.5% and payment term of 10 years. This
        selama 10 tahun. Transaksi perjanjian novasi                   loan novation agreement transaction has been
        pinjaman ini telah dituangkan ke dalam Akta No.                stated in Deed No. 102, 103, 104, 105, 106
        102, 103, 104, 105, 106 dan 107 pada tanggal                   and 107 on August 29, 2022 made before
        29 Agustus 2022 yang dibuat dihadapan Notaris                  Notary Mala Mukti SH, LLM.
        Mala Mukti SH, LLM.

        PT Trans Jabar Tol (TJT)                                       PT Trans Jabar Tol (TJT)
        Piutang lain-lain kepada TJT merupakan                         Other receivables from TJT represent working
        pinjaman modal kerja yang diberikan untuk                      capital loans provided for operational
        kebutuhan investasi operasional dan cash                       investment needs and cash deficiency support
        deficiency support (CDS). WTR juga mempunyai                   (CDS). WTR also has reimbursement
        piutang reimbursment terkait beban umum dan                    receivables     related  to     general and
        administrasi pada TJT.                                         administrative expenses at TJT.
        Perjanjian fasilitas pinjaman pemegang saham                   The shareholder loan facility agreement for
        untuk kebutuhan investasi telah mengalami                      investment needs has undergone the latest
        perubahan terakhir berdasarkan addendum                        amendment based on addendum Number
        Nomor ADD/08.25/WTR/0523 tanggal 3 Mei                         ADD/08.25/WTR/0523 dated May 3, 2023.
        2023. Pinjaman tersebut dikenakan bunga                        The loan bears interest of 11.50% per year
        11,50% per tahun yang jatuh tempo pada                         and matures on March 3, 2028.
        tanggal 3 Maret 2028.
        PT Istaka Karya (Persero)                                      PT Istaka Karya (Persero)
        Piutang lain-lain PT Istaka Karya (Persero)                    Other receivables from PT Istaka Karya
        sebesar Rp64.169.976.914 merupakan piutang                     (Persero) amounting to Rp64,169,976,914
        Perusahaan yang diberikan berdasarkan                          were receivables given in accordance with
        keputusan para Pemegang Saham Perusahaan                       the Decision of the Shareholders of
        di luar RUPS No. KEP-83/MBU/2011 dan                           the Company outside of the GMS No. KEP-
        No. KEP-PS04/PPA/0411 tanggal 1 April 2011.                    83/MBU/2011 and No. KEP-PS04/PPA/0411
        Pada tanggal 21 Mei 2011, Perusahaan                           dated April 1, 2011. On May 21, 2011,
        menerima Surat Pengakuan Utang No.                             the Company received a Letter of Debt
        L.05B/P/WK/2011 dan No. DU-SP/2011.01B dari                    Acknowledgement No. L.05B/P/ WK/2011 and
        PT     Istaka    Karya   (Persero) sebesar                     No. DU-SP/2011.01B from PT Istaka Karya
        Rp64.169.976.914.                                              (Persero) amounting to Rp64,169,976,914.
        Pada tanggal 12 April 2011, PT Istaka Karya                    On April 12, 2011, PT Istaka Karya (Persero)
        (Persero) memohon kepada Perusahaan sesuai                     requested to the Company through letter
        surat No. DK/2011-323 untuk menerbitkan                        No. DK/2011-323 to issue a bank guarantee
        garansi bank proyek Bandar Lampung bypass                      for Bandar Lampung bypass project amounting
        sebesar Rp10.661.885.000 dan biaya provisi                     to Rp10,661,885,000 and the cost of provision
        untuk penerbitan garansi bank sebesar                          for bank guarantee issuance amounting to
        Rp312.445.834. Pada tanggal 30 Maret 2012,                     Rp312,445,834. On March 30, 2012, the bank
        bank garansi No. 2011/JPU/GB/068/6148/                         guarantee No. 2011/JPU/GB/068/6148/Monday
        Monday telah dicairkan oleh pemilik proyek,                    has been executed by the owner of the project,
        sehingga piutang Perusahaan kepada PT Istaka                   so that the receivables of the Company from
        Karya      (Persero)    menjadi     sebesar                    PT Istaka Karya (Persero) amounting to
        Rp75.144.307.748.                                              Rp75,144,307,748.
        Ketidakmampuan PT Istaka Karya (Persero)                       Inability of PT Istaka Karya (Persero) in
        dalam     memenuhi     pembayaran    utangnya                  fulfilling  its  debt     payments,    caused
        menyebabkan penyelesaian utang dilakukan                       the settlement of debt using Debt to Equity
        dengan cara Debt to Equity Swap, yaitu para                    Swap to solve its debt, which means the
        kreditur mendapatkan posisi sebagai pemegang                   creditors get a position as an equity holder of
        ekuitas PT Istaka Karya (Persero) sebagai                      PT Istaka Karya (Persero) in line of payment
        pengganti pembayaran atas utang PT Istaka                      for a debt of PT Istaka Karya (Persero) to
        Karya (Persero) kepada para kreditur.                          the creditors. The payment of receivables will
        Pembayaran piutang akan dilakukan secara                       be settled partially on the 9th year for a
        bertahap ditahun ke 9 sampai maksimal 5 tahun.                 maximum of 5 years.
        Berdasarkan    surat   dari  Perusahaan                        According to    the  Company’s  letters
        No. 483/WK/Dir/2013 tanggal 7 Mei 2013                         No. 483/WK/Dir/2013 dated May 7, 2013
                                                          - 78 -
Page 82
PT WASKITA KARYA (PERSERO) Tbk                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                   (Expressed in Rupiah, unless otherwise stated)

        tentang Pelaksanaan Putusan Pengesahan                          thats     concerning      the    Execution   of
        Perdamaian (Homologasi) No. 23/PKPU/                            Decision      to    Ratification    of    Peace
        2012/PN.Niaga. JKT.PST. Perusahaan meminta                      (Homologation) No. 23/PKPU/2012/PN.Niaga.
        PT Istaka Karya (Persero) untuk menyelesaikan                   JKT.PST. The Company asked PT Istaka
        utangnya dengan skema penyelesaian sebagai                      Karya (Persero) to resolve the debt with
        berikut:                                                        the following settlement scheme:

       1.   Pembayaran awal senilai 3% atau sebesar                     1. The intial payment valued at 3% or
            Rp2.549.586.465.                                               amounting to Rp2,549,586,465.
       2.   Pemenuhan sisa pembayaran senilai 97%                       2. The fulfillment of the remaining payment
            dari jumlah utang dalam bentuk penyertaan                      valued at 97% from the total debt in the
            saham sementara (Debt to Equity Swap)                          form of temporary investments in share of
            sebesar Rp82.436.629.045.                                      stocks (Debt to Equity Swap) for
                                                                           Rp82,436,629,045.

       Berdasarkan surat di atas, Perusahaan                         Based on the above letters, the Company has
       menerima     jawaban    PT       Istaka Karya                 received the response from PT Istaka Karya
       (Persero) dengan surat No. DU/2013-131                        (Persero) with the letter No. DU/2013-131
       tanggal 15 Mei 2013 yang berisi:                              dated May 15, 2013 that contains:

       1.   Pembayaran awal 3% bersumber dari                        1.    The     intial    payment  of   3%     from
            pencairan piutang atas eskalasi proyek                         the disbursement of receivables of
            SKSD.                                                          the escalation SKSD project.
       2.   Sisa pembayaran sebesar 97% dalam                        2.    The remaining payment of 97% in the form
            bentuk    penyertaan     saham,    sedang                      of investments in share of stocks, is being
            dilakukan kajian oleh Kementrian Keuangan                      reviewed by the Ministry of Finance and
            dan instansi terkait.                                          related institutions.

       Sampai dengan tanggal pelaporan, PT Istaka                    Until the date of the report, PT Istaka Karya
       Karya (Persero) belum memenuhi sisa                           (Persero) has not fulfilled the remaining
       pembayaran senilai 97% dari jumlah utang                      payment valued at 97% from the total debt in
       dalam bentuk penyertaan saham sementara                       the form of temporary investments in shares of
       (Debt to Equity Swap) sehingga Perusahaan                     stock (Debt to Equity Swap) thus the Company
       membukukan cadangan kerugian penurunan                        provided allowance for impairment loss on
       piutang kepada PT Istaka Karya (Persero)                      receivable from PT Istaka Karya (Persero)
       sebesar Rp74.914.307.748 atau sebesar 100%                    amounting to Rp74,914,307,748 or 100% of
       dari nilai piutang. Tidak ada perubahan piutang               the receivable. There is no change in
       pada 30 September 2024 dan 31 Desember                        the balance of the receivable as of September
       2023.                                                         30, 2024 dan 31 Desember 2023.
       Sesuai dengan Peraturan Pemerintah Nomor 13                   In accordance with Government Regulation
       Tahun 2023 tentang Pembubaran, Perusahaan                     Number 13 of 2023 regarding Dissolution,
       dinyatakan    pailit  berdasarkan    putusan                  the Company was declared bankrupt based on
       Pengadilan Niaga pada Pengadilan Negeri                       the decision of the Commercial Court at
       Jakarta Pusat Nomor 26/Pdt.Pembatalan                         the Central Jakarta District Court Number
       Perdamaian/2022/PN.Niaga.Jkt.Pst. tanggal 12                  26/Pdt.Annulment         of       Peace/2022/PN.
       Juli 2022, sehingga harta pailit Perusahaan                   Niaga.Jkt.Pst. dated July 12, 2022, so that
       Persero (persero) berada dalam keadaan                        the bankrupt assets of the Company (Persero)
       insolvensi.    Penyelesaian      pembubaran                   are in a state of insolvency. Completion of
       Perusahaan Perseroan (Persero) sebagaimana                    the dissolution of the Company (Persero) as
       dimaksud dalam pelaksanaan likuidasi dalam                    referred to in the liquidation implementation in
       rangka pembubaran PT Istaka Karya sesuai                      the context of the dissolution of PT Istaka Karya
       dengan ketentuan:                                             in accordance with the provisions of:

       -    Peraturan perundang-undangan di bidang                  -     Laws and regulation in state-owned
            Badan Usaha Milik Negara;                                     enterprises;
       -    Peraturan perundang-undangan di bidang                  -     Laws and regulation in Bankruptcy
            Kepailitan dan Penundaan Kewajiban                            Postponement      of      Debt Payment
            Pembayaran Utang;                                             Obligations;
       -    Peraturan perundang-undangan di bidang                  -     Laws and regulation in Limited Liability
            Perseroan Terbatas;                                           Companies;
       -    Peraturan perundang-undangan lainnya.                   -     Other laws and regulation


                                                         - 79 -
Page 83
PT WASKITA KARYA (PERSERO) Tbk                                                          PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                      AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                              FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                        FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                              ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                      AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                               (Expressed in Rupiah, unless otherwise stated)

         Dilaksanakan paling lambat 5 (lima) tahun                                 Implemented at the latest in 5 (five) years from
         terhitung   sejak    Perusahaan      Perseroan                            the time the Company (Persero) PT Istaka
         (Persero) PT Istaka Karya dinyatakan pailit.                              Karya is declared bankrupt. All remaining assets
         Semua kekayaan sisa hasil likuidasi Peusahaan                             from the liquidation of the Company (Persero)
         Perseroan (persero) PT Istaka Karya disetorkan                            PT Istaka Karya were deposited into the State
         ke Kas Negara.                                                            Treasury.

         Mutasi penyisihan kerugian penurunan nilai                                The movements in allowance for impairment
         piutang lain-lain adalah sebagai berikut:                                 losses on other receivables are as follows:

                                                     30 September/              31 Desember/
                                                   September 30, 2024         December 31, 2023
                                                          Rp                         Rp

             Saldo Awal                                (253.887.890.319)          (335.206.427.351)                       Beginning Balance
             Penambahan PSAK 71 Tahun Berjalan             (896.523.110)           (35.776.139.221)      Addition of PSAK 71 for Current Year
             Pemulihan PSAK 71 Tahun Berjalan              1.599.934.344            117.094.676.253     Recovery of PSAK 71 for Current Year
             Pelepasan Entitas Anak                          451.935.414                          --               Divestment of Subsidiaries
             Saldo Akhir                               (252.732.543.671)          (253.887.890.319)                            Ending Balance


         Manajemen berkeyakinan bahwa jumlah                                       The management believes that the allowance
         penyisihan kerugian penurunan nilai piutang                               for impairment losses on other receivables is
         lain-lain cukup untuk menutupi kemungkinan                                sufficient to cover the possible losses on
         tidak tertagihnya piutang lainlain di kemudian                            the uncollectible other receivables in the future.
         hari.

11. PERSEDIAAN - BERSIH                                               11. INVENTORIES - NET

                                                   30 September/              31 Desember/
                                                 September 30, 2024         December 31, 2023
                                                        Rp                         Rp
   Bahan Baku                                                                                                                     Raw Materials
    Konstruksi                                          243.667.512.352         260.147.584.898                                   Construction
    Beton Precast                                       108.797.405.173         145.619.908.820                               Precast Concrete
    Produk Baja                                          20.632.791.859          22.965.816.005                                 Steel Products
   Sub Jumlah                                           373.097.709.384         428.733.309.723                                      Sub Total

   Persediaan dalam Pengembangan                                                                                              Work in Progress
    Aset Real Estat                                   3.611.262.166.126       3.605.066.566.983                             Real Estate Assets
    Tanah yang Belum Dikembangkan                           795.739.844             795.739.844                             Undeveloped Land
   Sub Jumlah                                         3.612.057.905.970       3.605.862.306.827                                       Sub Total

   Persediaan untuk Dijual                                                                                          Inventory Available for Sale
    Beton Precast                                       189.499.886.906         183.211.930.285                               Precast Concrete
    Tanah Kavling Siap Dijual                               598.345.228             598.345.228                    Lots of Land Ready for Sale
    Produk Baja                                          58.128.757.373          58.128.757.373                                 Steel Products
   Sub Jumlah                                           248.226.989.507         241.939.032.886                                       Sub Total
   Jumlah                                             4.233.382.604.861       4.276.534.649.436                                            Total
   Dikurangi: Penyisihan penurunan nilai                                                                  Less: Allowance for decline in Value of
    Persediaan                                          (77.471.006.895)        (84.070.121.299)                                     Inventories
   Jumlah                                             4.155.911.597.966       4.192.464.528.137                                            Total


   Bahan baku konstruksi merupakan persediaan                              Raw construction materials represents construction
   material dan perlengkapan proyek yang masih                             materials and equipment supply projects that are
   tersedia di gudang proyek yang dimiliki oleh Grup.                      still available at the warehouse of existing projects
   Persediaan material terdiri dari persediaan besi,                       owned by the Group. The raw materials consist of
   semen, solar, tiang pancang, keramik/ marmer,                           iron, cement, diesel, pile, ceramic/ marble, traveler
   traveler form, geotextile, aspal, dan batu.                             form, geotextile, asphalt, and stone.
   Beton precast merupakan persediaan produk                               Precast concrete represents the inventory of
   beton unit usaha precast yang terdiri dari                              concrete products of precast business units
   persediaan barang jadi produk beton, persediaan                         consisting of concrete finished goods, raw
   bahan baku, dan bahan penolong.                                         materials and supporting materials.
   Aset real estat merupakan bangunan apartemen                            Real estate assets represent apartment units
   yang    siap    dijual, tanah  yang   sedang                            ready for sale, land under development and
   dikembangkan dan bangunan yang sedang                                   buildings under construction.

                                                                  - 80 -
Page 84
PT WASKITA KARYA (PERSERO) Tbk                                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                       (Expressed in Rupiah, unless otherwise stated)

   dikonstruksi
   Persediaan produk baja merupakan persediaan                                     Stell product inventory consist of transmission tower
   atas tower transmisi dan guardrill yang belum bisa                              and guardrails that are not ready to solid because not
   terjual karena belum set lengkap.                                               in a completed set.
   Berdasarkan penelaahan atas kondisi persediaan                                  Based on the review of the condition of inventories
   pada akhir perode pelaporan, Manajemen                                          at the end of the reporting period, Management
   membentuk cadangan untuk penurunan nilai                                        provide an allowance for decline in value of inventories
   persediaan per 30 September 2024 dan 31                                         on September 30, 2024 and December 31, 2023
   Desember 2023 sebesar Rp77.471.006.895 dan                                      amounting        to       Rp77,471,006,895          and
   Rp84.070.121.299.                                                               Rp84,070,121,299.

12. TAGIHAN BRUTO KEPADA PENGGUNA JASA –                                      12. GROSS AMOUNTS DUE FROM CUSTOMERS –
    BERSIH                                                                        NET

                                                           30 September/             31 Desember/
                                                         September 30, 2024        December 31, 2023
                                                                Rp                        Rp
     Pihak Berelasi                                          3.308.980.050.187        3.422.651.607.716                                    Related Parties
     Dikurangi: Aset Keuangan                                                                                                        Less: Financial Asset
      Saling Hapus                                           (100.627.186.615)        (100.627.186.615)                                            Offset
     Sub Jumlah                                              3.208.352.863.572        3.322.024.421.101                                         Sub Total
     Pihak Ketiga                                            1.228.971.468.758        1.174.684.646.350                                      Third Parties
     Sub Jumlah                                              1.228.971.468.758        1.174.684.646.350                                         Sub Total
     Jumlah                                                  4.437.324.332.330        4.496.709.067.451                                             Total


   Rincian saldo tagihan bruto kepada pengguna jasa                                  The details of gross amount due from customers
   adalah sebagai berikut:                                                           are as follows:


                                                                                                            30 September/            31 Desember/
                                                                                                          September 30, 2024       December 31, 2023
                                                                                                                 Rp                       Rp
     Pihak Berelasi/ Related Parties
      PT Jasamarga Japek Selatan                                                                               1.176.997.895.019       1.174.269.822.434
      PT Perusahaan Listrik Negara (Persero)                                                                   1.072.462.460.641       1.495.583.872.266
      PT Cimanggis Cibitung Tollways                                                                             372.924.111.332         429.455.522.283
      PT Trans Jabar Tol                                                                                         263.189.948.554                       --
      PT Hutama Marga Waskita                                                                                    189.234.426.987         501.810.629.234
      PT Jasamarga Probolinggo Banyuwangi                                                                        169.563.073.863          42.461.264.918
      PT Citra Karya Jabar Tol                                                                                   144.545.454.545         144.545.454.545
      PT Hutama Karya (Persero)                                                                                  115.543.659.083         115.543.659.083
      PT Cibitung Tanjung Priok Port Tollways                                                                    106.692.237.548         156.865.760.611
      PT Angkasa Pura II (Persero)                                                                                46.901.377.914          51.465.575.376
      PT Pelindo III (Persero)                                                                                    40.993.360.503          39.052.332.786
      PT Kresna Kusuma Dyandra Marga                                                                              35.521.005.409          96.393.027.068
      Waskita - Nindya - LRS KSO                                                                                  21.640.060.000                       --
      PT Hakaaston                                                                                                20.946.491.083          20.946.491.083
      PT Hutama Karya Infrastruktur                                                                               20.576.510.000                       --
      Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                 124.733.949.927         105.448.045.403
      Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Tagihan Bruto/
       Less: Allowance For Impairment Expected Credit of Gross Amount due to from Customer                     (613.485.972.221)       (951.189.849.374)
     Jumlah Pihak Berelasi/ Total Related Parties                                                              3.308.980.050.187       3.422.651.607.716

     Pihak Ketiga/ Third Parties
      Kementerian Pekerjaan Umum dan Perumahan Rakyat/
       The Ministry of Public Works and Housing                                                                  890.119.081.964         706.657.626.088
      PT Sulsel Citra Indonesia                                                                                  137.685.920.529         137.685.920.529
      Pemerintah Daerah/ District Governments                                                                    132.147.277.310         140.605.318.459
      The Special Administrative Region of Oecusse-Ambeno of Timor Leste                                         119.785.827.525          93.455.741.460
      PT Puradelta Lestari Tbk                                                                                    36.210.277.846          17.931.878.159
      PT Duta Graha Karya                                                                                         20.035.131.164          27.508.934.418
      Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                               1.245.081.838.445       1.240.450.241.239
      Dikurangi: Penyisihan Kerugian Ekspektasian Penurunan Nilai Tagihan Bruto/
       Less: Allowance For Impairment Expected Credit of Gross Amount due to from Customer                   (1.352.093.886.025)     (1.189.611.014.002)
     Jumlah Pihak Ketiga/ Total Third Parties                                                                  1.228.971.468.758       1.174.684.646.350




                                                                          - 81 -
Page 85
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

   Informasi penting lainnya yang berkaitan dengan                 Other important information regarding        gross
   tagihan bruto kepada pengguna jasa adalah sebagai               amount due from customers are as follows:
   berikut:

   1.   PT Jasamarga Japek Selatan - Proyek Jalan                  1.   PT Jasamarga Japek Selatan - Jakarta
        Tol Jakarta Cikampek II Selatan Paket III                       Cikampek II Selatan Package III Toll Road
                                                                        Project

        Perusahaan mengadakan kontrak pekerjaan                         The Company entered into a construction
        untuk        pembangunan        Jalan       Tol                 contract for the Jakarta - Cikampek II
        Jakarta - Cikampek II Selatan Paket III dengan                  Selatan Package III Toll Road Project with
        nomor kontrak 03/KONTRAK.JJS/2019 dengan                        contract No. 03/KONTRAK.JJS/2019 with a
        nilai kontrak sebesar Rp3.493.213.750.909.                      contract value of Rp3,493,213,750,909.

   2.   PT Perusahaan Listrik Negara (Persero)                     2.   PT Perusahaan Listrik Negara (Persero)
        (PLN) - Proyek Transmisi Sumatera 500 KVA                       (PLN) - Sumatera Transmission 500 KVA
                                                                        Project

        Perusahaan mengadakan kontrak pekerjaan                         The Company entered into a construction
        untuk Pembangunan Transmisi Sumatera 500                        contract for the Sumatera Transmission 500 kVA
        kVA Paket 1 No. 0532.PJ/DAN.02.02/DIR/2015,                     Package 1 No. 0532.PJ/DAN.02.02/DIR/2015,
        Paket           2        No.           ADD3-                    Package        2    No.     ADD30533.PJ/DAN.
        0533.PJ/DAN.02.02/DIR/2015, dan Paket 3 No.                     02.02/DIR/2015, and Package 3 No. ADD1-
        ADD1-0372-I.PJ/DAN.02.02/DIR/2017     dengan                    0372.I.PJ/DAN.02.02 /DIR/2017 with a contract
        nilai   kontrak    masing-masing     sebesar                    value            of       Rp4,026,285,529,669,
        Rp4.026.285.529.669, Rp2.680.113.182.455 dan                    Rp2,680,113,182,455 and Rp2,684,429,824,467,
        Rp2.684.429.824.467.                                            respectively.
    3. PT Cimanggis Cibitung Tollways - Jalan Tol                  3.   PT Cimanggis Cibitung Tollways - Jalan
       Cimanggis Cibitung Seksi II                                      Tol Cimanggis Cibitung Seksi II

        Perusahaan         mengadakan        kontrak                    The       Company     entered      into     a
        pekerjaan    untuk    pembangunan      Jalan                    construction contract for the Cimanggis
        Tol    Cimanggis     Cibitung    Seksi     II                   Cibitung Section II Toll Road Project
        No. 22.01/DU-CCT/ADD/XII/2023 pada tanggal                      No.     22.01/DU-CCT/ADD/XII/2023       dated
        22 Desember 2023 dengan nilai kontrak                           December 22, 2023 with acontract value of
        sebesar Rp3.809.523.581.205 (tanpa PPN).                        Rp3,809,523,581,205 (Exclude VAT).

    4. PT Trans Jabar Tol - Proyek Probolinggo                     4.   PT Trans Jabar Tol – Ciawi Sukabumi Toll
       Banyuwangi Paket 3 JOP 25%                                       Road Project

        Perusahaan memperoleh kontrak pekerjaan                         The Companye entered into a construction
        No. 036/PERJ/TJT/X/2023 untuk pembangunan                       contract for the Ciawi Sukabumi Toll Road
        Jalan Tol Ciawi Sukabumi dengan nilai kontrak                   Project       in       accordance       with
        sebesar Rp631.143.592.242 untuk Seksi 3,                        the     addendum     of     agreement    No.
        sebesar Rp1.059.616.299.070 untuk Seksi 3B.                     036/PERJ/TJT/X/2023 with a contract value of
                                                                        Rp631,143,592,242       for     Section   3,
                                                                        Rp1,059,616,299,070 for Section 3B.

    5. PT Hutama Marga Waskita - Proyek Jalan                      5.   PT Hutama Marga Waskita -              Tebing
       Tol Tebing Tinggi - Parapat                                      Tinggi - Parapat Toll Road Project
        Perusahaan mengadakan kontrak pekerjaan                         The Company entered into a construction
        untuk pembangunan Jalan Tol Tebing                              contract for the Tebing Tinggi - Parapat Toll
        Tinggi - Parapat No. 006/ADD.KONTRAK-                           Road Project No. 006/ADD.KONTRAK-HMW/
        HMW/ VIII/2020 dengan nilai kontrak sebesar                     VIII/2020    with  a    contract  value   of
        Rp2.197.007.509.090.                                            Rp2,197,007,509,090.

    6. PT Citra Karya Jabar Tol – Proyek                           6.   PT Citra Karya Jabar Tol – TBPP Vgf
       pembangunan Tol TBPP Vgf Cisumdawu                               Cisumdawu Toll Road Project

        Perusahaan mengadakan kontrak pekerjaan                         The Company entered into a construction
        untuk pembangunan Tol TBPP Vgf Cisumdawu                        of the TBPP Vgf Cisumdawu Toll Road Project
        No. 317.D/SPJK-HK.04/IX/2018 dengan nilai                       No. 317.D/SPJK-HK.04/IX/2018 with a contract
        kontrak sebesar Rp481.818.181.818.                              value of Rp481,818,181,818.

                                                          - 82 -
Page 86
PT WASKITA KARYA (PERSERO) Tbk                                             PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                           FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                 ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                         AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                  (Expressed in Rupiah, unless otherwise stated)


    7. PT Jasamarga Probolinggo Banyuwangi -                     7.   PT Jasamarga Probolinggi Banyuwangi –
       Proyek Pembangunan Jalan Tol Ciawi                             Probolinggo Banyuwangi Toll Road Package
       Sukabumi                                                       3 JOP 25% Project

       Perusahaan memperoleh kontrak pekerjaan                        The Companye entered into a construction
       No. 021/KONTRAK/2023 untuk pembangunan                         contract for the Probolinggo Banyuwangi Toll
       Jalan Tol Probolinggo Banyuwangi Paket 3 JOP                   Road Package 3 JOP 25% Project in
       25%     dengan      nilai  kontrak   sebesar                   accordance with the addendum of agreement
       Rp996.821.538.317.                                             No. 021/KONTRAK/2023 with a contract value
                                                                      of Rp996,821,538,317.

    8. PT Hutama Karya (Persero) - Proyek                        8.   PT    Hutama    Karya      (Persero) -
       Pembangunan Jalan Tol Terbanggi Besar                          The Development of Terbanggi Besar -
       Pematang Panggang                                              Pematang Panggang Toll Road Project
       Perusahaan mengadakan kontrak pekerjaan                        The Company entered into a construction
       No. PBJT/AF.3459/S.Perj/59/2019 dengan nilai                   contract No. PBJT/AF.3459/S.Perj/59/2019
       kontrak sebesar Rp442.499.784.161 untuk                        amounted     to     Rp442,499,784,161    for
       pembangunan Jalan Tol Terbanggi Besar-                         the development of Terbanggi Besar-Pematang
       Pematang       Panggang      Zona     HK-1,                    Panggang Zona HK-1 Toll Road Project,
       Rp1.778.742.359.383 untuk pembangunan                          amounted    to    Rp1,778,742,359,383    for
       Jalan Tol Terbanggi Besar-Pematang Panggang                    the development of Terbanggi Besar -
       Zona     HK-2,    Rp856.654.890.679    untuk                   Pematang Panggang Zona HK-2 Toll Road
       pembangunan Jalan Tol Terbanggi Besar-                         Project,   Rp856,654,890,679      for   the
       Pematang Panggang Zona HK-3, dan                               development of Terbanggi Besar - Pematang
       Rp185.741.098.521 untuk pembangunan Jalan                      Panggang Zona HK-3 Toll Road Project, and
       Tol Terbanggi Besar-Pematang Panggang Zona                     Rp185,741,098,521 for the development of
       HK-4 Jembatan Sodong.                                          Terbanggi Besar - Pematang Panggang Zona
                                                                      HK-4 Sodong Toll Road Project.

    9. PT Hutama Karya (Persero) -           Proyek              9.   PT Hutama Karya (Persero) - Pematang
       Pematang Panggang - Kayu Agung                                 Panggang - Kayu Agung Project
       Perusahaan memperoleh kontrak pekerjaan                        The Company entered into a construction
       No.    PBJT/AF.3459/S.Perj/59/2019   untuk                     contract No. PBJT/AF.3459/S.Perj/59/2019
       pembangunan      Jalan     Tol    Pematang                     for    the     development     of    Pematang
       Panggang - Kayu Agung dengan nilai kontrak                     Panggang - Kayu Agung Toll Road with a
       sebesar Rp622.703.919.383 untuk Seksi 1,                       contract value of Rp622,703,919,383 for Section
       sebesar Rp434.890.726.064 untuk Seksi 1a,                      1, Rp434,890,726,064 for Section 1a,
       sebesar Rp1.827.814.190.904 untuk Seksi 2,                     Rp1,827,814,190,904        for    Section    2,
       sebesar Rp1.020.944.279.465 untuk Seksi 2a,                    Rp1,020,944,279,465       for   Section     2a,
       sebesar Rp506.693.608.324 untuk Seksi 2b,                      Rp506,693,608,324       for     Section     2b,
       sebesar Rp2.105.066.823.305 untuk Seksi 3,                     Rp2,105,066,823,305        for    Section    3,
       Rp1.388.581.735.869 untuk Seksi 4, dan                         Rp1,388,581,735,869 for Section 4, and
       Rp517.365.548.368 untuk Seksi 4a.                              amounted to Rp517,365,548,368 for Section 4a.

    10. PT Cibitung Tanjung Priok Port Tollways -                10. PT Cibitung Tanjung Priok Port Tollways -
        Proyek Jalan Tol Cibitung Clincing                           Cibitung Clincing Toll Road Project

       Perusahaan mengadakan kontrak pekerjaan                        The Company entered into a construction
       untuk pembangunan Jalan tol Cibitung CIlincing                 contract for the Cibitung Cilincing Toll Road
       sesuai dengan addendum perjanjian No. 007/                     Project in accordance with the addendum of
       ADD.IX/KONTRAK/WK-CTP/VI/2020         dengan                   agreement No. 007/ADD.IX/KONTRAK/WK-
       nilai kontrak sebesar Rp6.665.967.025.715                      CTP/VI/2020 with the contract value of
       (tanpa PPN).                                                   Rp6,665,967,025,715 (excluding VAT).




                                                        - 83 -
Page 87
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

    11. Kementerian    Pekerjaan  Umum     dan                         11. Ministry of Public Works and Housing -
        Perumahan Rakyat - Proyek Pembangunan                              The Development of Tanjung Lesung Special
        Pengaman Pantai Kawasan Ekonomi Khusus                             Economic Zone Coastal Development
        Tanjung Lesung                                                     Project

        Perusahaan mengadakan kontrak pekerjaan                              The Company entered into a construction
        untuk Proyek Pembangunan Pengaman Pantai                             contract for the Tanjung Lesung Special
        Kawasan Ekonomi Khusus Tanjung Lesung                                Economic Zone Coastal Development Project
        No.       HK.02.03/09-ADDII/APBN/SP.II/2021                          No. HK.02.03/09-ADDII/APBN/SP.II/2021 with a
        dengan       nilai     kontrak     sebesar                           contract    value  of    Rp227,194,050,000
        Rp227.194.050.000 (termasuk PPN).                                    (including VAT).

    12. Kementerian   Pekerjaan   Umum    dan                          12. Ministry of Public Works and Housing -
        Perumahan Rakyat - Proyek Pembangunan                              The Development of Bener Dam Package II
        Bendungan Bener Paket II
        Perusahaan mengadakan kontrak pekerjaan                              The Company entered into a construction
        untuk pembangunan Bendungan Bener Paket II                           contract for the development of Bener Dam
        No. Add 03/KSO-WSKTJATIWANGI/BENER-                                  Package II No. Add 03/KSO-WSKTJATIWANGI/
        02/2020 dengan nilai kontrak sebesar                                 BENER-02/2020 with a contract value of
        Rp557.877.638.182.                                                   Rp557,877,638,182.

   13. Kementerian   Pekerjaan   Umum    dan                           13. Ministry of Public Works and Housing -
       Perumahan Rakyat - Proyek Pembangunan                               The Development of Rukoh Dam Package II
       Bendungan Rukoh Paket II
        Perusahaan mengadakan kontrak pekerjaan                              The Company entered into a construction
        untuk pembangunan Bendungan Rukoh Paket II                           contract for the development of Rukoh Dam
        Add IV No. HK.01.02/Bws1.8.3/304 pada                                Package II Add IV No. HK.01.02/Bws1.8.3/304
        tanggal 27 Agustus 2020 dengan nilai kontrak                         dated August 27, 2020 with a contract value of
        sebesar Rp595.368.766.619.                                           Rp595,368,766,619.
   14. PT Sulsel Citra Indah - Pembangunan Twin                        14. PT Sulsel Citra Indah - The Development of
       Tower Makassar                                                      Twin Tower Makassar
        Perusahaan mengadakan kontrak pekerjaan                              The Company entered into a construction
        untuk pembangunan proyek Pembangunan                                 contract on the development of Twin Tower
        Twin Tower Makassar No. 011/PJA-PT.SCI/DB-                           Makassar No. 011/PJA-PT.SCI/DBTTM/11/2020
        TTM/11/2020 pada tanggal 01 Agustus 2017                             dated August 1, 2017 with contract value of
        dengan       nilai    kontrak      sebesar                           Rp1,728,686,086,000.
        Rp1.728.686.086.000.
   Mutasi penyisihan kerugian penurunan nilai tagihan                  The movements in allowance for impairment
   bruto kepada pengguna jasa dan pekerjaan dalam                      losses on gross amount due from customers and
   proses adalah sebagai berikut:                                      work in progress are as follows:
                                             30 September/             31 Desember/
                                           September 30, 2024        December 31, 2023
                                                  Rp                        Rp

     Saldo Awal                              (2.140.800.863.376)       (1.961.196.092.105)                          Beginning Balance
     Penambahan PSAK 71 Periode Berjalan       (117.270.550.596)         (600.528.269.377)       Addition of PSAK 71 for Current Period
     Pemulihan PSAK 71 Periode Berjalan          279.216.441.771           434.994.498.194      Recovery of PSAK 71 for Current Period
     Pelepasan Entitas Anak                       13.275.113.955                         --                  Divestment of Subsidiaries
     Reklasifikasi                                             --         (14.071.000.088)                             Reclassification
     Saldo Akhir/ Ending Balance             (1.965.579.858.246)       (2.140.800.863.376)



   Manajemen      berpendapat  bahwa    penyisihan                     The management believes that allowance for
   kerugianpenurunan nilai tagihan bruto kepada                        impairment losses of gross amount due from
   pengguna jasa adalah cukup untuk menutupi                           customers is sufficient to cover the possible losses
   kemungkinan tidak tertagihnya tagihan bruto di                      on the uncollectible gross amount due from
   kemudian hari.                                                      customers in the future.




                                                            - 84 -
Page 88
PT WASKITA KARYA (PERSERO) Tbk                                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                      (Expressed in Rupiah, unless otherwise stated)


   Analisa tagihan bruto kepada pengguna jasa kepada                                The analysis of gross amount due from customers
   pelanggan     dan     pekerjaan   dalam     proses                               and work in progress based on age are as follows:
   berdasarkan umur adalah sebagai berikut:
                                                           30 September/            31 Desember/
                                                         September 30, 2024       December 31, 2023
                                                                Rp                       Rp

      0-30 Hari                                             2.209.330.023.638        3.196.213.538.878                                  0-30 Days
      31-180 Hari                                             828.807.487.994          808.766.635.575                               31-180 Days
      181 - 360 Hari                                          849.376.983.036          388.178.147.996                             181 - 360 Days
      > 360 Hari                                            2.515.389.695.908        2.244.351.608.378                                > 360 Days
     Jumlah                                                 6.402.904.190.576        6.637.509.930.827                                       Total



   13.
    15. PERPAJAKAN                                                              13. TAXES

   a.   Pajak Dibayar Dimuka                                                        a.    Prepaid Taxes
                                                             30 September/             31 Desember/
                                                           September 30, 2024        December 31, 2023
                                                                  Rp                        Rp
            Pasal 4 (2)                                         16.834.122.400             17.125.243.794                             Article 4(2)
            Pasal 22                                             2.659.992.494              2.396.554.765                              Article 22
            Pasal 23                                           226.692.152.943            206.101.195.415                              Article 23
            Pasal 28A                                           16.441.395.466             13.203.308.245                             Article 28A
            Pajak Pertambahan Nilai                            624.230.497.770            382.277.309.957                       Value Added Tax
            Jumlah                                             886.858.161.073            621.103.612.176                                    Total


   b.   Utang Pajak                                                                 b. Taxes Payables

                                                             30 September/             31 Desember/
                                                           September 30, 2024       December 31, 2023*)
                                                                  Rp                        Rp
            Utang Pajak Jangka Pendek                                                                                Short-Term Taxes Payable
             Pasal 15                                                12.115.615                          --                             Article 15
             Pasal 21                                            12.708.465.439             32.472.698.492                              Article 21
             Pasal 22                                               404.005.424              8.164.547.332                              Article 22
             Pasal 23                                             3.390.863.678             23.664.459.359                              Article 23
             Pajak Final Konstruksi                             713.509.245.727            695.751.832.651                Construction Final Tax
             Pajak Pertambahan Nilai                          1.156.727.463.854          1.672.336.397.419                     Value Added Tax
             Pasal 4 (2) - Final                                  9.774.258.892             24.533.959.234                    Article 4 (2) - Final
             Pasal 29                                             4.626.449.840            140.383.210.531                              Article 29
             Pajak Hotel dan Restoran                             1.631.016.928              1.937.705.083             Hotel and Restaurant Tax
             Pajak Revaluasi                                        978.490.652                987.973.676                      Revaluation Tax
            Total Utang Pajak Jangka Pendek                   1.903.762.376.049          2.600.232.783.777     Total Short-Term Taxes Payable
            Utang Pajak Jangka Panjang                                                                               Long-Term Taxes Payable
             Pajak Final Konstruksi                             263.800.089.757            283.619.686.764              Construction Final Tax
            Total Utang Pajak Jangka Panjang                    263.800.089.757            283.619.686.764     Total Long-Term Taxes Payable
            Jumlah                                            2.167.562.465.806          2.883.852.470.541                                Total

            *) Direklasifikasi kembali pada Catatan 61                                                               *) As reclassified in Note 61


   c.   Beban (Manfaat) Pajak Penghasilan                                           c.    Income Tax Expense (Benefit)

                                                                 30 September/ September 30,
                                                                 2024                  2023
                                                                  Rp                    Rp
            Beban Pajak Kini                                                                                                Current Tax Expense
             Entitas Anak                                       41.176.739.846           205.469.952.613                            Subsidiaries
            Beban Pajak Tangguhan                                1.993.067.931               731.837.974                   Deferred Tax Expense
            Jumlah                                              43.169.807.777           206.201.790.587                                     Total




                                                                        - 85 -
Page 89
PT WASKITA KARYA (PERSERO) Tbk                                                                                       PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                   AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                           FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                     FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                           ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                   AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                            (Expressed in Rupiah, unless otherwise stated)


   d.    Pajak Tangguhan                                                                                   d. Deferred Tax

                                                                                                              (Dibebankan)                 Dikreditkan (Dibebankan)
                                                                                                              Dikreditkan ke                    ke Penghasilan
                                                                                                           Laba Rugi/(Charged)                Komprehensif Lain/
                                                         1 Januari/                Penyesuaian/              Credited to Profit                   Credited to                  30 September/
                                                       January 1, 2024              Adjustment                   or Loss                 Other Comprehensive Income          September 30, 2024
                                                             Rp                         Rp                          Rp                                Rp                            Rp
          Aset Pajak Tangguhan/
            Deferred Tax Assets
            WTR                                              13.195.528.851                        --                               --                              --               13.195.528.851
            PBTR                                                175.346.083                        --                               --                              --                  175.346.083
            WBW                                                  12.808.875                        --                       2.208.377                               --                   15.017.252
            WTTR                                                 10.776.018                        --                               --                              --                   10.776.018
            TJT                                                 708.793.983             (708.793.983)                                                               --                            --
          Jumlah Aset Pajak Tangguhan/
          Total Deferred Tax Assets                          14.103.253.810             (708.793.983)                       2.208.377                               --               13.396.668.204

          Liabilitas Pajak Tangguhan/
            Deferred Tax Liabilities
            WKR                                                 7.126.727.164                         --              (1.995.276.308)                               --                9.122.003.472
            WST                                                    20.875.987                         --                           --                               --                   20.875.987
          Jumlah Liabilitas Pajak Tangguhan/
          Total Deferred Tax Liabilities                        7.147.603.151                         --              (1.995.276.308)                               --                9.142.879.459



                                                                                                              (Dibebankan)                 Dikreditkan (Dibebankan)
                                                                                                              Dikreditkan ke                    ke Penghasilan
                                                                                                           Laba Rugi/(Charged)                Komprehensif Lain/
                                                         1 Januari/                Penyesuaian/              Credited to Profit                   Credited to                  31 Desember/
                                                       January 1, 2023              Adjustment                   or Loss                 Other Comprehensive Income          December 31, 2023
                                                             Rp                         Rp                          Rp                                Rp                            Rp
          Aset Pajak Tangguhan/
            Deferred Tax Assets
            TJT                                                 379.438.312                           --                  273.503.446                     55.852.225                    708.793.983
            WTR                                              12.208.180.052                           --                  991.609.175                     (4.260.376)                13.195.528.851
            WTTR                                                 12.960.498                           --                   (2.184.480)                             --                    10.776.018
            WBW                                               2.002.543.709                           --              (1.989.734.834)                              --                    12.808.875
            PBTR                                                 67.978.740                           --                  107.367.343                              --                   175.346.083
            WST                                                  21.704.343                           --                 (21.704.343)                              --                             --
          Jumlah Aset Pajak Tangguhan/
          Total Deferred Tax Assets                          14.692.805.654                           --                (641.143.693)                      51.591.849                14.103.253.810

          Liabilitas Pajak Tangguhan/
            Deferred Tax Liabilities
            WST                                                             --                        --                 (20.875.987)                               --                   20.875.987
            WKR                                                 6.100.593.183                         --              (1.026.133.981)                               --                7.126.727.164
          Jumlah Liabilitas Pajak Tangguhan/
          Total Deferred Tax Liabilities                        6.100.593.183                         --              (1.047.009.968)                               --                7.147.603.151


   e.    Administrasi Pajak                                                                                e.      Tax Administration
         Surat Ketetapan Pajak                                                                                     Tax Assessment Letters

         Perusahaan menerima Surat Tagihan Pajak                                                                   The Company has received Tax Collection
         sebesar Rp132.063.957.312 terkait denda                                                                   Letter amounting to Rp132,063,957,312 related
         pajak, sebagai berikut:                                                                                   to administrative sanction of tax, as follows:
                                                                                                                                                                                Terima (Bayar)/
                Entitas/                         Jenis Pajak/                        Masa Pajak/                Tahun terbit/     Tahun                  STP/                    Cash Receipt
                Entities                        Type of Taxes                        Tax Period                 Issued year      Paid year       Tax Collection Letter            (Payment)

        Perusahaan/ The Company      PPh 21, PPh 23, PPh 4(2)                         Jan - Des 2019                2024            2024                   800.238.352            Bayar/ Paid
                                                                                        Ags 2020
                                                                                      Okt - Des 2021
                                                                                 Jun - Ags dan Des 2023
                                     PPN Dalam Negeri                                Apr- Des 2019                  2024            2024                 6.569.137.501            Bayar/ Paid
                                                                                      Jun-Okt 2023
                                     PPh Pasal 25/29 Badan                           Jan- Des 2019                  2024            2024                                 -
                                     Jumlah Bayar/ Paid 2024                                                                                             7.369.375.853


                                     PPh 21, PPh 23, PPh 4(2)                        Jan- Mei 2020                  2024            2024                                 -
                                                                                   Jun dan Des 2023
                                     PPN Dalam Negeri                                  Mei 2020                     2024            2024               124.694.581.459       Belum dibayar/ Unpaid
                                                                                   Jun dan Des 2023
                                     Jumlah Belum dibayar/ Unpaid 2024                                                                                 124.694.581.459



                                     Jumlah STP 2024                                                                                                   132.063.957.312




                                                                                           - 86 -
Page 90
PT WASKITA KARYA (PERSERO) Tbk                                                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                           (Expressed in Rupiah, unless otherwise stated)

         Perusahaan menerima Surat Ketetapan Pajak                                                            The Company has received Tax Assessments
         sebesar Rp41.730.694.391 terkait denda pajak,                                                        Letter amounting to Rp41,730,694,391 related
         sebagai berikut:                                                                                     to administrative sanction of tax, as follows:
                                                                                                                               Tahun
                    Entitas/                          Jenis Pajak/                    Masa Pajak/           Tahun terbit/                   SKPKB/ Under                  Cash Receipt
                                                                                                                               bayar/
                    Entities                         Type of Taxes                    Tax Period            Issued year       Paid year   Payment Assessment               (Payment)


          Perusahaan/ The Company         PPh 21, PPh 23, PPh 4(2)                    Jan- Des 2019             2024            2024             2.621.735.735             Bayar/ Paid
                                                                                        Ags 2020
                                                                                      Okt-Des 2021
                                                                                  Jun-Ags dan Des 2023
                                          PPN Dalam Negeri                           Apr- Des 2019              2024            2024             3.791.740.125             Bayar/ Paid
                                                                                      Jun-Okt 2023
                                          PPh Pasal 25/29 Badan                      Jan- Des 2019              2024            2024             2.915.373.091             Bayar/ Paid
                                          Jumlah Bayar/ Paid 2024                                                                                9.328.848.951




                                          PPN Dalam Negeri                           Jan - Mar 2021             2024            2024            32.401.845.440     Belum dibayar/ Unpaid
                                          Jumlah Belum dibayar/ Unpaid 2024                                                                     32.401.845.440

                                          Jumlah SKPKB 2024                                                                                     41.730.694.391



         Kontribusi Pajak                                                                                     Tax Contribution

         Kontribusi perpajakan Grup kepada Pemerintah                                                         The Group's tax contribution to the Government
         Indonesia sesuai dengan Surat Edaran                                                                 of Indonesia as required by the Circular Letter of
         Kementerian Badan Usaha Milik Negara                                                                 Ministry of State-Owned Enterprises ofthe
         Republik Indonesia No. S-32/DKU.MBU/                                                                 Republic of Indonesia No. S-32/DKU.MBU/08/
         08/2024 selama periode yang berakhir 30                                                              2024 during the period ended September 30,
         September 2024, jumlah setoran pajak yang                                                            2024, total tax payments made by the Company
         dilakukan     oleh    Perusahaan    sebesar                                                          amounting to Rp848,096,852,104, as follows:
         Rp848.096.852.104, sebagai berikut:

                                                                                                                                                  Total Kontribusi
                                                                              Jenis Kontribusi
                                                                                                                                                        (Rp)
                                A.    Pajak
                                1.    Pajak Penghasilan (PPh)                                                                                      159.176.775.800
                                2.    Pajak Pertambahan Nilai (PPN) & Pajak Penjualan atas Barang Mewah (PPnBM)                                    688.649.662.564
                                3.    Bea Masuk/Keluar, Bea & Cukai, dan Bea Materai                                                                                  -
                                4.    PBB P3 (Perkebunan, Perhutanan, Pertambangan)                                                                                   -
                                5.    Pajak Pemerintah Pusat Lainnya (misalnya Pajak Karbon)                                                                          -
                                6.    Pajak Daerah dan Retribusi Daerah (PDRD), termasuk PPB P2 (Perkotaan dan Pedesaan)                               270.413.740
                               Total Kontribusi Pajak (Total A)                                                                                    848.096.852.104

                                B.    Penerimaan Negara Bukan Pajak (PNBP)
                                 1.   Dividen                                                                                                                         -
                                 2.   PNBP Lainnya                                                                                                                    -
                               Total Kontribusi PNBP (Total B)                                                                                                        -

                               Total Kontribusi kepada Negara (Total A & B )                                                                       848.096.852.104




14. UANG MUKA DAN BIAYA DIBAYAR DIMUKA                                                         14. ADVANCES AND PREPAYMENTS

                                                                        30 September/                    31 Desember/
                                                                      September 30, 2024              December 31, 2023*)
                                                                             Rp                               Rp

     Uang Muka Investasi                                                       280.000.000.000              280.000.000.000                                      Advances for Investment
     Uang Muka Kontrak                                                         246.387.198.954              171.166.332.248                                       Advances for Contracts
     Biaya Dibayar Dimuka                                                       90.109.669.114               80.105.857.625                                           Prepaid Expenses
     Lain-lain                                                                   8.518.563.452                9.798.057.402                                                       Others
     Jumlah                                                                    625.015.431.520              541.070.247.275                                                              Total
     *) Direklasifikasi pada Catatan 61                                                                                                                    *) As reclassified in Note 61

   Uang muka investasi merupakan pembayaran                                                              Advances for investment represent payments to
   kepada PT Asuransi Jiwasraya (Persero) atas surat                                                     PT Asuransi Jiwasraya (Persero) for the offering
   penawaran kerjasama aset properti investasi melalui                                                   letter of joint investment property assets through a

                                                                                          - 87 -
Page 91
PT WASKITA KARYA (PERSERO) Tbk                                                                         PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                             FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                       FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                             ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                     AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                              (Expressed in Rupiah, unless otherwise stated)

   konsorsium Perusahaan, PT Wijaya Karya (Persero)                                          consortium of the Company, PT Wijaya Karya
   Tbk, PT Pembangunan Perumahan (Persero) Tbk,                                              (Persero) Tbk, PT Pembangunan Perumahan
   PT Adhi Karya (Persero) Tbk, dan PT Hutama Karya                                          (Persero) Tbk, PT Adhi Karya (Persero) Tbk, and
   (Persero). Perjanjian konsorsium tersebut terbentuk                                       PT Hutama Karya (Persero). The Consortium
   untuk melakukan optimalisasi properti (tanah dan                                          agreement was formed to optimize the property
   bangunan) milik PT Asuransi Jiwasraya (Persero)                                           (land and building) owned by PT Asuransi
   sesuai dengan Perjanjian No. 161.SJ.U.1018                                                Jiwasraya (Persero) in accordance with agreement
   dan No. TP.01.03/A.DIR.16877/2018 tanggal                                                 No. 161.SJ.U.1018 and No. TP.01.03/A.DIR.
   11 Oktober 2018. Sesuai dengan perjanjian                                                 16877/2018 dated October 11, 2018. In accordance
   pendahuluan antara PT Asuransi Jiwasraya                                                  with the preliminary agreements between PT
   (Persero) dengan konsorsium BUMN Karya bahwa                                              Asuransi Jiwasraya (Persero) with a consortium of
   tanda minat atas rencana pengembangan atau                                                BUMN Karya that the sign of interest in
   pengalihan hak atas obyek optimalisasi adalah                                             the development plan or transfer of rights to
   sebesar Rp1.400.000.000.000. Jumlah pembagian                                             the optimization object is Rp1,400,000,000,000.
   porsi untuk masing-masing BUMN Karya adalah                                               The number of servings for each BUMN Karya is
   20%, sehingga jumlah penyertaan Perusahaan                                                20%, so the amount of company's inclusion in
   dalam       konsorsium         tersebut      adalah                                       the consortium is Rp280,000,000,000.
   Rp280.000.000.000.

   Uang muka kontrak diberikan kepada subkontraktor,                                         Advances for contracts represent payment to
   pemasok dan mandor borong yang bekerja pada                                               subcontractors, suppliers and the entire stock who
   proyek yang dilaksanakan oleh Grup. Penyelesaian                                          worked on the Group’s projects. The settlement of
   uang muka akan diperhitungkan dengan termin yang                                          advance will be calculated based on the invoice
   akan dibayarkan kepada pihak ketiga yang                                                  that will be paid related to third parties concerned.
   bersangkutan

   Biaya dibayar dimuka terdiri dari transaksi seperti;                                      Prepaid expenses consist of transaction such as;
   kontrak sewa jangka pendek, premi asuransi dibayar                                        short-term rental contracts, prepaid insurance
   dimuka, dan pendapatan yang diterima dimuka.                                              premiums, and unearned income.

15. INVESTASI PADA ENTITAS                             ASOSIASI       DAN           15. INVESTMENT                     IN   ASSOCIATES                   AND       JOINT
    VENTURA BERSAMA                                                                     VENTURES

   Rincian saldo investasi pada entitas asosiasi dan                                         The details of investments in associates and joint
   ventura bersama adalah sebagai berikut:                                                   ventures are as follows:
                                                                                                                              30 September/                31 Desember/
                                                                                                                            September 30, 2024           December 31, 2023
                                                                                                                                   Rp                           Rp
     Investasi pada Entitas Asosiasi/ Investments in Associates                                                                     27.243.789.839            121.273.092.924
     Investasi pada Ventura Bersama/ Investments in Joint Ventures                                                               3.756.125.075.447          2.201.740.173.004
     Jumlah/ Total                                                                                                               3.783.368.865.286          2.323.013.265.928



   Investasi pada asosiasi                                                                   Investment in associates

   Rincian saldo investasi pada asosiasi adalah                                              Details of investments in associates are as follows:
   sebagai berikut:

                                                                       30 September/             31 Desember/
                                                                     September 30, 2024        December 31, 2023              Aktivitas utama/               Kedudukan/
                                                                            Rp                        Rp                      Principal activity              Domicile
     PT Cimanggis Cibitung Tollways                                          7.404.458.280           101.466.409.981 Operator Jalan Tol/ Toll operator         Indonesia
     PT Hotel Karya Indonesia                                               16.089.331.559            16.056.682.943 Hotel/ Hotel                              Indonesia
     PT Waskita Bali Mandara                                                 3.750.000.000             3.750.000.000 Operator Jalan Tol/ Toll operator         Indonesia
     Jumlah/ Total                                                          27.243.789.839           121.273.092.924




                                                                                - 88 -
Page 92
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)


   Rincian dan mutasi investasi pada entitas asosiasi                                  The details of ownership interest and movements
   pada tanggal 30 September 2024 dan 31 Desember                                      of investment in associates entities as of
   2023 adalah sebagai berikut:                                                        September 30, 2024 and December 31, 2023 are as
                                                                                       follows:

                                                                                        30 September/ September 30, 2024
                                                                                             Bagian laba (rugi)
                                              Saldo awal/                                     entitas asosiasi/
                                              Beginning            Penambahan/          Equity in net income profit    Pengurangan/          Penyesuaian/               Saldo akhir/
                                       %       balance               Addition              (loss) of associates          Deduction            Adjustment               Ending balance
                                                  Rp                   Rp                            Rp                     Rp                    Rp                         Rp

     PT Cimanggis Cibitung Tollways   35,00     101.466.409.981                   --               (94.061.951.701)                    --                        --           7.404.458.280
     PT Hotel Karya Indonesia         25,00      16.056.682.943                   --                    32.648.616                     --                        --          16.089.331.559
     PT Waskita Bali Mandara          60,00       3.750.000.000                   --                             --                    --                        --           3.750.000.000
     Jumlah/ Total                               121.273.092.924                  --               (94.029.303.085)                    --                        --          27.243.789.839



                                                                                        31 Desember/ December 31, 2023
                                                                                            Bagian laba (rugi)
                                              Saldo awal/                                    entitas asosiasi/
                                              Beginning            Penambahan/         Equity in net income profit    Pengurangan/          Penyesuaian/               Saldo akhir/
                                       %       balance               Addition             (loss) of associates         Deduction             Adjustment               Ending balance
                                                  Rp                   Rp                           Rp                    Rp                     Rp                         Rp
     PT Cimanggis Cibitung Tollways   35,00     150.223.355.789                  --                  (48.756.945.808)                 --                    --            101.466.409.981
     PT Hotel Karya Indonesia         25,00      16.012.248.918                  --                       44.434.025                  --                    --             16.056.682.943
     PT Waskita Bali Mandara          60,00       3.750.000.000                  --                                --                 --                    --               3.750.000.000
     Jumlah/ Total                               169.985.604.707                 --                  (48.712.511.783)                 --                    --            121.273.092.924



   PT Cimanggis Cibitung Tollways (CCT)                                                PT Cimanggis Cibitung Tollways (CCT)
   Pendirian CCT (kepemilikan tidak langsung melalui                                   The establishment of CCT (indirect ownership
   WTR) adalah sesuai dengan akta notaris                                              through WTR) was based on notarial deed No. 52
   No. 52 tanggal 22 Februari 2008 dari notaris Agus                                   dated February 22, 2008 of notary Agus Madjid,
   Madjid, S.H. M.Kn. Akta pendirian ini telah                                         S.H. M.Kn. The deed was approved by the Minister
   mendapat persetujuan oleh Menteri Hukum dan Hak                                     of Law and Human Rights through decision letter
   Asasi Manusia melalui surat keputusan No. AHU-                                      No.    AHU-09738.AH.01.01.Tahun.2008      dated
   09738.AH.01.01.Tahun.2008 tanggal 27 Februari                                       February 27, 2008.
   2008.
   Selanjutnya, peralihan pemegang saham CCT                                           Furthermore, the change in ownership of CCT
   kepada WTR dilakukan berdasarkan dengan akta                                        to WTR was based on notarial deed No. 30 dated
   notaris No. 30 tanggal 13 Juli 2015 dari notaris Jose                               July 13, 2015 of notary Jose Dima Satria, S.H.
   Dima Satria, S.H. M.Kn.                                                             M.Kn.
   Anggaran Dasar Perusahaan telah beberapa kali                                       The Company's Articles of Association has been
   mengalami perubahan berdasarkan akta No. 67                                         amended several times based on Notarial Deed No.
   tanggal 30 Juni 2022 oleh Lestiani Wang, S.H.,                                      67 dated June 30,2022 by Lestiani Wang, S.H.
   M.Kn., WTR melepas saham di CCT kepada SMI                                          M.Kn., WTR sold its ownership in shares at CCT to
   dengan harga sebesar Rp44.000.000.000 atau                                          SMI amounting to Rp44,000,000,000 or equivalent
   setara dengan 44.000.000 lembar saham.                                              to 44,000,000 shares. WTR's share ownership in
   Kepemilikan saham WTR di CCT menjadi sebesar                                        CCT was reduced to 35%. The Group recognized a
   35% dari modal yang disetor. Grup mengakui                                          gain on partial disposal of CCT amounting to
   keuntungan dari penjualan sebagian CCT sebesar                                      Rp76,602,456,099 which is included on other
   Rp76.602.456.099 sebagai pendapatan (beban)                                         income (expense) - net.
   lain-lain - bersih.
   PT Hotel Karya Indonesia (HKI)                                                      PT Hotel Karya Indonesia (HKI)
   Pendirian PT HKI adalah sesuai dengan akta notaris                                  The establishment of PT HKI was in accordance
   No. 10 Cintya Ayu Rashanty, S.H., M.Kn., tanggal                                    with notarial deed No. 10 of Cintya Ayu Rashanty,
   29 Oktober 2018. Akta ini telah mendapat                                            S.H., M.Kn., dated October 29, 2018. This deed has
   pengesahan Menteri Hukum dan Hak Asasi Manusia                                      been approved by the Minister of Law and Human
   dalam surat keputusan No. AHU-0053574.AH.01.01                                      Rights in his decree No. AHU-0053574.AH.01.01
   Tahun 2018 tanggal 9 November 2018                                                  2018 dated November 9, 2018.
   Berdasarkan Akta Notaris Cintya Ayu Rishanty,                                       Based on notarial deed No. 15 of Cintya Ayu
   S.H., M.Kn., No. 15 tanggal 28 Januari 2019, WKR                                    Rishanty, S.H., dated January 28, 2019, WKR
                                                                        - 89 -
Page 93
PT WASKITA KARYA (PERSERO) Tbk                                                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                    (Expressed in Rupiah, unless otherwise stated)

   memiliki     penyertaan  di    HKI     sebesar                                                 has    investment    in    HKI amounting    to
   Rp15.525.000.000, Akta ini telah mendapat                                                      Rp15,525,000,000. This deed has been approved
   pengesahan Menteri Hukum dan Hak Asasi Manusia                                                 by the Minister of Law and Human Rights based
   sesuai        dengan     Surat      Keputusan                                                  on decree No. AHU-0017985.AH.01.11.Tahun
   No. AHU-0017985.AH.01.11.Tahun 2019 tanggal                                                    2019 dated February 4, 2019.
   4 Februari 2019.

   PT Waskita Bali Mandara (WBM)                                                                  PT Waskita Bali Mandara (WBM)
   WTR, entitas anak, memiliki penyertaan sebesar                                                 WTR, a subsidiary, has 60% ownershipin
   60% pada WBM. WBM didirikan sesuai Akta                                                        WBM. WBM was established under the Deed of
   Pendirian No. 6 tanggal 13 November 2015 dari                                                  Establishment No. 6 dated November 13, 2015 of
   Notaris Jose Dima Satria, S.H., M.Kn. WBM belum                                                Notary Jose Dima Satria, S.H., M.Kn. WBM has
   memiliki hak pengusahaan jalan tol.                                                            no toll road concession right.
   Manajemen berpendapat bahwa tidak terdapat                                                     Management believes there is no impairment on
   penurunan nilai atas investasi pada entitas asosiasi.                                          investment in associates.
   Jumlah aset, liabilitas, pendapatan, dan laba/ rugi                                            Total assets, liabilities, revenues and income/ loss of
   entitas asosiasi adalah sebagai berikut:                                                       associates are as follows:
                                                                                                   30 September/ September 30, 2024
                                                                     Aset/                       Liabilitas/              Pendapatan/                                  Laba (Rugi)/
                                                                    Assets                       Liabilities                Revenue                                    Profit (Loss)
                                                                      Rp                            Rp                         Rp                                           Rp
     PT Waskita Bali Mandara                                          4.146.537.660                     1.000.000                                   --                             58.317.893
     PT Cimanggis Cibitung Tollways                              12.598.152.843.635            10.530.706.117.457                   1.261.319.245.232                       (268.748.433.434)
     PT Hotel Karya Indonesia                                        58.676.184.661                 4.356.874.177                                   --                            117.489.055


                                                                                                    31 Desember / December 31, 2023
                                                                      Aset/                      Liabilitas/              Pendapatan/                                   Laba (Rugi)/
                                                                     Assets                      Liabilities                Revenue                                     Profit (Loss)
                                                                       Rp                            Rp                         Rp                                           Rp
     PT Waskita Bali Mandara                                          4.146.537.660                      1.000.000                                   --                            58.317.893
     PT Cimanggis Cibitung Tollways                              11.503.579.706.679              9.304.784.547.066                   1.778.734.933.155                      (139.305.559.447)
     PT Hotel Karya Indonesia                                        58.543.299.988                  4.356.874.177                                   --                           177.736.100


   Investasi pada Ventura Bersama                                                                 Investment in Joint Ventures

   Rincian saldo investasi ventura bersama adalah                                                 Details of investments in joint ventures are as
   sebagai berikut:                                                                               follows:
                                                                                                30 September/ September 30, 2024
                                                                                                                              Setoran (Penarikan)/    Pengakuan Laba
                                                                                                                               Koreksi/ Placement         (Rugi)/
                                                                                        Persentase/         Saldo Awal/          (Withdrawal)/          Gain (Loss)            Saldo Akhir/
                                                                                        Percentage       Beginning Balance         Correction           Recognition           Ending Balance
                                                         Proyek/ Project                    %                   Rp                     Rp                   Rp                      Rp
     Pihak Berelasi/ Related Parties
      WTR - SMI                        Jalan Tol Bogor-Ciawi-Sukabumi                      65%                              --   1.514.824.920.388     (106.167.721.975)       1.408.657.198.413
      WKR - RNI                        RNI Office Park                                     96%                266.702.479.986                    --        1.853.986.257         268.556.466.243
      Waskita - NK                     Jalan Batu Aji Kuaro                                60%                 38.473.287.580                    --                    --         38.473.287.580
      Waskita - Nindya - Permata       Jalan Feeder IKN                                    50%                 17.028.305.864      (17.049.055.640)       27.914.729.365          27.893.979.589
      Waskita - Wika                   Jalan Tol Ciawi Sukabumi seksi 1                    51%                 17.964.836.939                    --                    --         17.964.836.939
      Waskita - Adhi                   Bendungan Margatiga                                 65%                 14.691.719.147                    --          157.886.190          14.849.605.337
      Waskita - Nindya                 Kantor Kementerian Koordinator 3                    51%                 11.944.295.206      (10.200.000.000)        9.856.396.777          11.600.691.983
      Waskita - Abipraya               Stadion Kanjuruhan Malang                           60%                    820.770.610                    --       10.306.690.760          11.127.461.370
      Waskita - Amarta                 Medan Islamic Center                                70%                  1.898.130.795                    --        6.614.282.635           8.512.413.430
      Waskita - Wika - PP - HK         Jatigede Sumedang                                   25%                  7.448.173.986                    --                    --          7.448.173.986
      Waskita - HK                     Sal Induk Sidorejo                                  51%                  7.348.709.249                    --                    --          7.348.709.249
      Waskita - PP                     Jalan Kretek - Girijati                             53%                  1.601.608.282       (3.577.888.469)        9.110.606.367           7.134.326.180
      Waskita - Nindya - LRS           LRT Jakarta                                         50%                  2.191.250.449       (7.358.939.368)       11.589.808.991           6.422.120.072
      Wika - Waskita - Nindya          Soker MYC                                           31%                  5.201.594.252                    --                    --          5.201.594.252
      Waskita - PP                     Rehabilitasi dan Renovasi Stadion Jawa Timur        51%                              --      (4.434.950.084)        9.311.305.054           4.876.354.970
      Waskita - PP - Wika              Jembatan Merah Putih                                34%                  4.183.348.157                    --                    --          4.183.348.157
      Waskita - PP                     Kamijoro                                            51%                  3.469.442.433                    --                    --          3.469.442.433
      Brantas - Waskita                Bendungan Tapin                                     49%                  2.317.496.645                    --                    --          2.317.496.645
      Waskita - Adhi                   Bendungan Way Sekampung (Paket 2)                   63%                  2.235.148.980                    --           37.219.870           2.272.368.850
      Waskita - Adhi KSO               Bendungan Jlantah JOI                               60%                              --                   --        2.127.324.644           2.127.324.644
      Waskita - Adhi                   Pengaman Pantai Jakarta Tahap 2 Paket 1             60%                  1.198.606.264                    --                    --          1.198.606.264
      Waskita - Adhi                   Bendungan Leuwi Keris Paket 2                       70%                      2.007.077                    --                    --              2.007.077
      Kresna Kusuma Dyandra Marga      Jalan Tol Bekasi Cawang Kampung Melayu              76%                              --     324.401.124.726     (324.401.124.726)                       --
     Sub Jumlah/ Sub Total                                                                                    406.721.211.901    1.796.605.211.553     (341.688.609.791)       1.861.637.813.663




                                                                                      - 90 -
Page 94
PT WASKITA KARYA (PERSERO) Tbk                                                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                             (Expressed in Rupiah, unless otherwise stated)
                                                                                                         30 September/ September 30, 2024
                                                                                                                                       Setoran (Penarikan)/    Pengakuan Laba
                                                                                                                                        Koreksi/ Placement         (Rugi)/
                                                                                                 Persentase/         Saldo Awal/          (Withdrawal)/          Gain (Loss)          Saldo Akhir/
                                                                                                 Percentage       Beginning Balance         Correction           Recognition         Ending Balance
                                                              Proyek/ Project                        %                   Rp                     Rp                   Rp                    Rp


     Pihak Ketiga/ Third Parties
      WKR - Darmo Permai                    Segi 88 Avenue                                         51%                300.407.440.770                     --        1.638.963.284       302.046.404.054
      Waskita - Acset                       Jalanlayang Cikampek                                   51%                285.320.773.721                     --        (730.222.474)       284.590.551.247
      Waskita - Triniti                     Alam Sutra                                             51%                166.315.135.609                     --      (2.420.385.830)       163.894.749.779
      WKR - Sirius                          Yukata Suites                                          51%                127.456.204.586                     --        (821.241.388)       126.634.963.198
      Waskita - Bahagia Bangun Nusa         Bendungan Temef (Paket 1)                              78%                119.549.938.350                     --                    --      119.549.938.350
      Metallurgical - Wika - NK - Waskita   Jl Tol Cisumdawu Phase 2                                8%                 97.864.492.151                     --           70.832.887        97.935.325.038
      Waskita - Gorip Nanda Guna            Jl. Gempor Paket 2 Porong-Kejapan                      60%                 94.269.521.263                     --                    --       94.269.521.263
      Waskita - Guntur                      Tol IKN Tempadung-Pulau Balang                         50%                 85.398.387.741                     --        3.962.633.103        89.361.020.844
      Dalawa - WKR                          Zallaka - Batu Tumpeng                                 41%                 65.390.707.789                     --                    --       65.390.707.789
      Waskita - Abdi Mulia Berkah           Sal Primer Jabung II                                   70%                 63.309.602.430                     --                    --       63.309.602.430
      Waskita - JPC                         SMM Muara Teweh Div.Sipil                              68%                 53.230.724.936                     --                    --       53.230.724.936
      Daelim - Wika - Waskita               Karian Multipurpose Dam Project                        22%                 49.824.407.003                     --          365.825.928        50.190.232.931
      WKR - Permata Hijau                   WKR - Permata Hijau                                    51%                 42.929.358.014                     --            2.279.245        42.931.637.259
      Waskita - Adhi - Jaya                 Bayung Lencir - Tempino Seksi 1                        40%                 45.393.883.049      (12.000.000.000)         8.728.647.386        42.122.530.435
      Waskita - Yasa                        Jl. Galing Aruk                                        100%                38.918.539.425                     --                    --       38.918.539.425
      Waskita - Jakon - Sagna               Bendungan Tiga Dihaji                                  57%                 28.401.677.509                     --        9.200.293.735        37.601.971.244
      KSO WKR - Vision First                JPM Dukuh Atas                                         92%                              --       33.864.113.345           678.052.547        34.542.165.892
      Waskita - Bawakaraeng                 Irigasi D.I. Batang Alai                               70%                 29.947.164.581                     --                    --       29.947.164.581
      Waskita - Sumber                      Pelabuhan SKPT Morotai                                 70%                  1.106.934.384                     --      16.342.314.512         17.449.248.896
      PP - WSKT - YASA                      Jalan Feeder IKN 6C                                    33%                    172.316.268      (25.071.428.571)       39.890.708.315         14.991.596.012
      Nindya - WSKT - Naviri - Panca        Jl Akses Bandara VVIP IKN                              35%                              --      (2.345.000.000)       15.801.369.658         13.456.369.658
      Waskita - Kementerian PUPR - Cipta    Renovasi Tambahan PON Di Aceh (JOI 70%)                70%                              --                    --      10.041.772.383         10.041.772.383
      Karya
      Waskita - Kelman Infrapratama         Proyek SPAM Jatiluhur (pd.Kopi)                         70%                  4.675.137.541      (4.675.137.541)         8.554.846.286         8.554.846.286
      Waskita - Wika - PP - Jaya            Gd. Terminal 3                                          45%                  8.477.877.216                    --                    --        8.477.877.216
      PP - Adhi - Waskita - MWT             Proyek Serang Panimban Seksi 3                          28%                              --       5.863.666.572         2.058.083.046         7.921.749.618
      Waskita - BRAP                        Patimban Akses toll road                                60%                              --                   --        7.880.928.719         7.880.928.719
      Waskita - BRP                         Sedimentasi Bendungan Sumbawa                           65%                  9.824.991.426                    --      (2.083.876.120)         7.741.115.306
      Nindya - WSKT - Bina Nusa Lestari     Pematangan Lahan KITB                                   40%                  5.418.112.136      (9.418.112.137)       10.825.859.293          6.825.859.292
      Toa - Waskita - Wakachiku - HK -      Patimban Port Development                               16%                 12.161.798.697     (10.140.299.470)         4.525.756.435         6.547.255.662
      Abipraya
      Waskita - Bersinar                    Pembangunan IPAL 1,2,3 IKN                              70%                              --                  --        5.487.832.775          5.487.832.775
      PP - Waskita - Sarana                 Proyek Jln. Bululawang - Tambakrejo JOI                 40%                    271.460.732      (2.680.817.863)        7.894.409.532          5.485.052.401
      Waskita - KMP                         Rekonstruksi Jalan Kwatisore - Kamp Muri                70%                  8.031.012.724      (4.200.000.000)        1.279.651.333          5.110.664.057
      WIKA - Waskita - Jaya Konstruksi      Jalan Tol IKN Seksi 3B-2 ; Segmen KKT Kariangau         20%                              --     (3.000.000.000)        8.059.885.930          5.059.885.930
      Manggala- PP
      Waskita - Matra                       Pembangunan PJUTS Wilayah 4                            90%                   3.347.860.694                    --        1.501.665.713         4.849.526.407
      Waskita - Riki Kencana                FO Sekip Ujung                                         65%                   4.651.391.431                    --      (1.180.590.954)         3.470.800.477
      Waskita - BRP                         JI Mrican Paket 2                                      70%                   6.053.109.319      (6.500.411.601)         3.892.016.877         3.444.714.595
      Waskita - Pijar                       Double Track Manggarai                                 65%                   3.748.869.642                    --        (711.665.311)         3.037.204.331
      Waskita - Adhi - As                   Bendungan Rukoh Paket 2                                58%                               --                   --        2.700.729.644         2.700.729.644
      Waskita - Andesmont                   Bangunan Pengarah Bendungan Rukoh                      70%                               --                   --        2.194.039.992         2.194.039.992
      Waskita - Arkonin                     Revitalisasi TPA Regional Sarbagita Suwing (MYC)       92%                   1.730.920.261                    --                    --        1.730.920.261
      Waskita - Bangkit - Infra             Bendungan Karangnongko Paket II                        55%                               --                   --        1.049.465.495         1.049.465.495
      Waskita - Citra Mandiri               Jaringan Irigasi D.I Air Lakitan                       70%                   1.006.945.967                    --                    --        1.006.945.967
      WKI - AKI                             Pengadaan Material                                     97%                               --         259.000.000           638.013.391           897.013.391
      HPP - WKI                             Pekerjaan Tanah Proyek Tol Lot 2                       47%                               --         439.557.905           257.006.929           696.564.834
      Waskita - Amarta                      Gedung GIK UGM                                         65%                   4.283.134.270      (4.818.707.612)         1.091.841.207           556.267.865
      WKI - KBK                             Pengadaan Material                                     55%                               --                   --          382.509.616           382.509.616
      Waskita - Gala Karya                  JDU SPAM Regional Durolis                              70%                     320.998.998                    --                    --          320.998.998
      WKR - Ekatama                         Apartemen Pejaten                                      60%                     291.033.379                    --                    --          291.033.379
      Waskita - Taruna Putra Pertiwi        Jaringan Irigasi D.I Colo (MYC)                        70%                     131.537.905                    --                    --          131.537.905
      Waskita - Surya Bakti                 Jalan Pendekat Mahakam IV Sisi Samarinda Kota          60%                     119.208.279                    --                    --          119.208.279
      Waskita - BRAP                        Irigasi Belitang Lempuing Pkt 2                        60%                               --                   --          104.094.451           104.094.451
      Waskita - Bahagia - Guntur            Pembangunan Bendungan Temef                            65%                   2.692.056.325      (2.692.082.325)             3.906.991             3.880.991
      Waskita - Nindya - Modern             Jalan IKN Sepaku Segmen 4                              70%                  16.601.283.937          765.136.968      (17.366.420.905)                     --
      Waskita - Rinenggo - Antaraksa        Proyek Bangunan Stasiun Medan                          40%                               --       1.916.609.278       (1.916.609.278)                     --
      Waskita-BK-BBP-KPR                    Pembangunan Bendungan Cibeet                           58%                               --       1.221.293.363       (1.221.293.363)                     --
      Waskita - PAL                         PLTU 2X3 MW Malinau                                    100%                              --     15.458.728.081       (15.458.728.081)                     --
      Waskita - BRAP                        Irigasi Belitang Lempuing Pkt 3                        60%                               --         384.095.495         (384.095.495)                     --
      Waskita - Cempaka                     Bendung Baliase                                        55%                     341.026.402                    --        (341.026.402)                     --
      Waskita - Wika - Shanghai             Jl Tol Cisumdawu Phase 1                               10%                   5.631.984.243      (4.787.682.723)         (844.301.520)                     --
     Sub Jumlah/ Sub Total                                                                                           1.795.018.961.103     (32.157.478.836)      131.625.779.517      1.894.487.261.784
     Jumlah/ Total                                                                                                   2.201.740.173.004    1.764.447.732.717     (210.062.830.274)     3.756.125.075.447



                                                                                                         31 Desember/ December 31, 2023
                                                                                                                                      Setoran (Penarikan)/     Pengakuan Laba
                                                                                                                                      Koreksi/ Placement           (Rugi)/
                                                                                                Persentase/         Saldo Awal/          (Withdrawal)/           Gain (Loss)          Saldo Akhir/
                                                                                                Percentage       Beginning Balance        Correction             Recognition         Ending Balance
                                                             Proyek/ Project                        %                   Rp                     Rp                    Rp                    Rp
     Pihak Berelasi/ Related Parties
      WKR - RNI                             RNI Office Park                                         96%               266.562.767.380                     --          139.712.606       266.702.479.986
      Waskita - NK                          Jalan Batu Aji Kuaro                                    60%                38.473.287.580                     --                    --       38.473.287.580
      Waskita - Wika                        Jalan Tol Ciawi Sukabumi seksi 1                        51%                17.964.836.939                     --                    --       17.964.836.939
      Waskita - Adhi                        Bendungan Margatiga                                     65%                16.635.139.914       (3.250.000.000)         1.306.579.233        14.691.719.147
      Waskita - Nindya - Permata            Jalan Feeder IKN                                        50%                             --                    --      17.028.305.864         17.028.305.864
      Waskita - Nindya                      Kantor Kementerian Koordinator 3                        51%                             --                    --      11.944.295.206         11.944.295.206
      Waskita - Wika - PP - HK              Jatigede Sumedang                                       25%                 7.448.173.986                     --                    --        7.448.173.986
      Waskita - HK                          Sal Induk Sidorejo                                      51%                 7.348.709.249                     --                    --        7.348.709.249
      Wika - Waskita - Nindya               Soker MYC                                               31%                 5.215.697.790           (14.103.538)                    --        5.201.594.252
      Waskita - PP - Wika                   Jembatan Merah Putih                                    34%                 4.182.650.808                     --              697.349         4.183.348.157
      Waskita - PP                          Kamijoro                                                51%                 5.678.543.341       (2.209.100.908)                     --        3.469.442.433
      Brantas - Waskita                     Bendungan Tapin                                         49%                66.645.493.877      (64.327.997.232)                     --        2.317.496.645
      Waskita - Adhi                        Bendungan Way Sekampung (Paket 2)                       63%                 1.262.699.663         (135.798.542)         1.108.247.859         2.235.148.980
      Waskita - Nindya - LRS                LRT Jakarta                                             50%                             --        7.358.939.368       (5.167.688.919)         2.191.250.449
      Waskita - Amarta                      Medan Islamic Center                                    70%                             --                    --        1.898.130.795         1.898.130.795




                                                                                               - 91 -
Page 95
PT WASKITA KARYA (PERSERO) Tbk                                                                                         PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                             FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                       FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                             ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                     AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                              (Expressed in Rupiah, unless otherwise stated)

                                                                                                           31 Desember/ December 31, 2023
                                                                                                                                        Setoran (Penarikan)/     Pengakuan Laba
                                                                                                                                        Koreksi/ Placement           (Rugi)/
                                                                                                  Persentase/         Saldo Awal/          (Withdrawal)/           Gain (Loss)          Saldo Akhir/
                                                                                                  Percentage       Beginning Balance        Correction             Recognition         Ending Balance
                                                               Proyek/ Project                        %                   Rp                     Rp                    Rp                    Rp


     Waskita - PP                            Jalan Kretek - Girijati                                 53%                              --                    --        1.601.608.282         1.601.608.282
     Waskita - Adhi                          Pengaman Pantai Jakarta Tahap 2 Paket 1                 60%                  1.198.606.264                     --                    --        1.198.606.264
     Waskita - Abipraya                      Stadion Kanjuruhan Malang                               60%                              --                    --          820.770.610           820.770.610
     Waskita - Adhi                          Bendungan Leuwi Keris Paket 2                           70%                  2.596.649.439       (2.594.642.362)                     --            2.007.077
     Waskita - Wika                          Irigasi Batang Sinamar                                  60%                  1.691.371.060       (1.691.371.060)                     --                    --
     Waskita - Yodya Karya                   Bandara Husein                                          99%                  7.849.919.710       (7.849.919.710)                     --                    --
     Wika - Waskita                          RSUD Pasar Minggu                                       40%                    271.701.933         (271.701.933)                     --                    --
     Kresna Kusuma Dyandra Marga             Jalan Tol Bekasi Cawang Kampung Melayu                  76%                271.729.357.786      211.738.763.369      (483.468.121.155)                     --
     Waskita - PP KSO                        Rehabilitasi dan Renovasi Stadion Jawa Timur            51%                              --          438.679.387         (438.679.387)                     --
     Sub Jumlah/ Sub Total                                                                                              722.755.606.719      137.191.746.839      (453.226.141.657)       406.721.211.901
     Pihak Ketiga/ Third Parties
      WKR - Darmo Permai                     Segi 88 Avenue                                          51%                297.078.554.244                    --         3.328.886.526       300.407.440.770
      Waskita - Acset                        Jalanlayang Cikampek                                    51%                285.235.466.002                    --            85.307.719       285.320.773.721
      Waskita - Triniti                      Alam Sutra                                              51%                166.030.020.301                    --           285.115.308       166.315.135.609
      WKR - Sirius                           Yukata Suites                                           51%                127.775.368.668                    --         (319.164.082)       127.456.204.586
      Waskita - Bahagia Bangun Nusa          Bendungan Temef (Paket 1)                               78%                119.554.911.418           (4.973.068)                     --      119.549.938.350
      Metallurgical - Wika - NK - Waskita    Jl Tol Cisumdawu Phase 2                                 8%                109.581.243.263        1.965.713.887       (13.682.464.999)        97.864.492.151
      Waskita - Gorip Nanda Guna             Jl. Gempor Paket 2 Porong-Kejapan                       60%                 94.269.521.263                    --                     --       94.269.521.263
      Waskita - Guntur                       Tol IKN Tempadung-Pulau Balang                          50%                  1.488.791.675     (49.933.987.985)       133.843.584.051         85.398.387.741
      Dalawa - WKR                           Zallaka - Batu Tumpeng                                  41%                 65.390.707.789                    --                     --       65.390.707.789
      Waskita - Abdi Mulia Berkah            Sal Primer Jabung II                                    70%                 33.808.507.543       29.501.094.887                      --       63.309.602.430
      Waskita - JPC                          SMM Muara Teweh Div.Sipil                               68%                 53.230.724.936                    --                     --       53.230.724.936
      Daelim - Wika - Waskita                Karian Multipurpose Dam Project                         22%                 40.296.040.231                    --         9.528.366.772        49.824.407.003
      Waskita - Adhi - Jaya                  Bayung Lencir - Tempino Seksi 1                         40%                              --                   --        45.393.883.049        45.393.883.049
      WKR - Permata Hijau                    WKR - Permata Hijau                                     51%                 42.926.919.852                    --             2.438.162        42.929.358.014
      Waskita - Yasa                         Jl. Galing Aruk                                         100%                38.918.539.425                    --                     --       38.918.539.425
      Waskita - Bawakaraeng                  Irigasi D.I. Batang Alai                                70%                 29.947.164.581                    --                     --       29.947.164.581
      Waskita - Jakon - Sagna                Bendungan Tiga Dihaji                                   57%                 26.200.114.917                    --         2.201.562.592        28.401.677.509
      Waskita - Nindya - Modern              Jalan IKN Sepaku Segmen 4                               70%                              --                   --        16.601.283.937        16.601.283.937
      Toa - Waskita - Wakachiku - HK -       Patimban Port Development                               16%                              --      10.140.299.470          2.021.499.227        12.161.798.697
      Abipraya
      Waskita - BRP                          Sedimentasi Bendungan Sumbawa                           65%                 18.228.928.625     (18.671.882.037)        10.267.944.838          9.824.991.426
      Waskita - Wika - PP - Jaya             Gd. Terminal 3                                          45%                  8.477.877.216                    --                     --        8.477.877.216
      Waskita - KMP                          Rekonstruksi Jalan Kwatisore - Kamp Muri                70%                    972.834.968                    --         7.058.177.756         8.031.012.724
      Waskita - BRP, KSO                     JI Mrican Paket 2                                       70%                              --     (1.480.697.783)          7.533.807.102         6.053.109.319
      Waskita - Wika - Shanghai              Jl Tol Cisumdawu Phase 1                                10%                  6.476.285.760        (844.301.517)                      --        5.631.984.243
      Nindya - Waskita - Bina Nusa Lestari   Pematangan Lahan KITB                                   40%                              --                   --         5.418.112.136         5.418.112.136
      Waskita - Kelman Infrapratama, KSO     Proyek SPAM Jatiluhur (pd.Kopi)                         70%                              --                   --         4.675.137.541         4.675.137.541
      Waskita - Riki Kencana                 FO Sekip Ujung                                          65%                  9.455.741.654                    --       (4.804.350.223)         4.651.391.431
      Waskita - Amarta                       Gedung GIK UGM                                          65%                     35.665.116                    --         4.247.469.154         4.283.134.270
      Waskita - Pijar                        Double Track Manggarai                                  65%                  5.211.844.294                    --       (1.462.974.652)         3.748.869.642
      Waskita - Matra                        Pembangunan PJUTS Wilayah 4                             90%                              --                   --         3.347.860.694         3.347.860.694
      Waskita - Bahagia - Guntur, KSO        Pembangunan Bendungan Temef (JOI 65%)                   65%                              --                   --         2.692.056.325         2.692.056.325
      Waskita - Arkonin                      Revitalisasi TPA Regional Sarbagita Suwing (MYC)        92%                 32.553.342.664     (30.822.422.403)                      --        1.730.920.261
      Waskita - Sumber                       Pelabuhan SKPT Morotai                                  70%                              --                   --         1.106.934.384         1.106.934.384
      Waskita - Citra Mandiri                Jaringan Irigasi D.I Air Lakitan                        70%                 30.368.509.867     (29.361.563.900)                      --        1.006.945.967
      Waskita - Cempaka                      Bendung Baliase                                         55%                    341.026.402                    --                     --          341.026.402
      Waskita - Gala Karya                   JDU SPAM Regional Durolis                               70%                 15.252.926.255     (14.931.927.257)                      --          320.998.998
      WKR - Ekatama                          Apartemen Pejaten                                       60%                    291.033.379                    --                     --          291.033.379
      PP - Waskita - Sarana KSO              Proyek Jln. Bululawang - Tambakrejo JOI (40%)           40%                              --                   --           271.460.732           271.460.732
      PP - Waskita - YASA KSO                Jalan Feeder IKN 6C                                     33%                              --                   --           172.316.268           172.316.268
      Waskita - Taruna Putra Pertiwi         Jaringan Irigasi D.I Colo (MYC)                         70%                 15.245.087.088     (15.113.549.183)                      --          131.537.905
      Waskita - Surya Bakti                  Jalan Pendekat Mahakam IV Sisi Samarinda Kota           60%                    119.208.279                    --                     --          119.208.279
      WKI - BBM                              Pekerjaan Clearing, Cut & Fill Tanah                    45%                              --       (160.966.080)            160.966.080                     --
      Waskita - Rinenggo - Antaraksa         Proyek Bangunan Stasiun Medan                           40%                              --       4.336.447.852        (4.336.447.852)                     --
      Waskita-BK-BBP-KPR                     Pembangunan Bendungan Cibeet                            58%                              --          25.099.703            (25.099.703)                    --
      Waskita - Penta                        Lansekap Bandara Soetta                                 98%                 15.893.747.018     (15.893.747.018)                      --                    --
      Waskita - Bersinar                     Pembangunan IPAL 1,2,3 IKN                              70%                              --       9.180.044.544        (9.180.044.544)                     --
      KSO WKR - Vision First                 JPM Dukuh Atas                                          92%                 25.107.814.975     (25.107.814.975)                      --                    --
      Waskita - PAL                          PLTU 2X3 MW Malinau                                     100%                             --       3.874.062.672        (3.874.062.672)                     --
      Waskita - Bangkit - Infra              Bendungan Karangnongko Paket II                         55%                              --         871.635.647          (871.635.647)                     --
     Sub Jumlah/ Sub Total                                                                                             1.715.764.469.668   (142.433.434.544)       221.687.925.979      1.795.018.961.103
     Jumlah/ Total                                                                                                     2.438.520.076.387      (5.241.687.705)     (231.538.215.678)     2.201.740.173.004



   PT Trans Jabar Tol (TJT) - (WTR - SMI)                                                                   PT Trans Jabar Tol (TJT) - (WTR - SMI)
   Pendirian TJT (kepemilikan tidak langsung melalui                                                        The establishment of TJT (indirect ownership
   WTR) adalah sesuai dengan akta notaris No. 79                                                            through WTR) was based on notarial deed No. 79
   tanggal 19 Juli 2007 dari notaris Humberg Lie, S.H.,                                                     dated July 19, 2007 of notary Humberg Lie, S.H.,
   M.Kn. Akta pendirian ini telah mendapat persetujuan                                                      M.Kn. This notarial deed has been approved by
   oleh Menteri Hukum dan Hak Asasi Manusia melalui                                                         the Minister of Law and Human Rights through
   surat    keputusan     No.     W29-01398-HT.01.01-                                                       the decision letter No. W29-01398-HT.01.01-
   TH.2007.                                                                                                 TH.2007.

   Akuisisi TJT oleh WTR sesuai dengan akta notaris                                                         Acquisition of TJT by WTR was in accordance with
   Jose Dima Satria, S.H., M.Kn No. 44 tanggal 22                                                           the deed of notary Jose Dima Satria, S.H., M.Kn
   Desember 2015. Akta ini telah mendapat                                                                   No. 44 dated December 22, 2015. This deed was
   persetujuan oleh Menteri Hukum dan Hak Asasi                                                             approved by the Minister of Law and Human Rights
   Manusia      melalui   surat No. AHU-AH.01.03-                                                           through the decision letter No. AHU-AH.01.03-
   0990894.                                                                                                 0990894.


                                                                                                - 92 -
Page 96
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   Berdasarkan Akta Jual Beli Nomor 26 tanggal 25                   Based on the Sale and Purchase Deed Number 26
   Januari 2024 antara PT Waskita Toll Road dengan                  dated January 25, 2024, between PT Waskita Toll
   PT Sarana Multi Infrastruktur telah terjadi transaksi            Road and PT Sarana Multi Infrastruktur, there has
   jual beli kepemilikan saham WTR di TJT kepada                    been a sale and purchase transaction of WTR share
   SMI. WTR menjual dan menyerahkan kepada SMI                      ownership in TJT to SMI. WTR sold and handed
   kepemilikan saham di TJT dengan harga total                      over to SMI its share ownership in TJT for a total
   sebesar     Rp755.330.988.463,-     atau      sebesar            price of Rp755,330,988,463,- or 1,235,922 shares.
   1.235.922 lembar saham. Berdasarkan transaksi                    Based on this transaction, SMI became a
   tersebut SMI menjadi salah satu pemegang saham                   shareholder in TJT with a percentage of 25%, while
   di TJT dengan prosentase sebesar 25%, sedangkan                  WTR's ownership in TJT became 74.99% and the
   kepemilikan WTR di TJT menjadi 74,99% dan                        remaining     0.01%     was    owned     by   the
   sisanya sebesar 0,01% dimiliki oleh Koperasi                     Koperasi Waskita.
   Waskita.

   Berdasarkan Akta No 28 tanggal 25 Januari 2024                   Based on notarial deed No 28 dated January 25,
   yang dibuat di hadapan notaris Liestiani Wang, S.H.,             2024, drawn up by Liestani Wang S.H., M.Kn.,
   M.Kn., Notaris di Jakarta. Perusahaan tidak                      Notary in Jakarta. The company do not paid in
   melakukan setoran modal kepada TJT dan                           capital to TJT and percentage of share ownership in
   presentase kepemilikan saham Perusahaan di TJT                   TJT reduced or diluted become 65,12%. This deed
   berkurang atau terdilusi menjadi 65,12%. Akta ini                was approved by Minister of Law and Human Rights
   telah disetujui oleh Menteri Hukum dan Hak Asasi                 of The Republic of Indonesia through decision letter
   Manusia         dengan       Surat        Keputusan              No AHU-AH.01.03-0027563 dated January 30,
   No AHU-AH.01.03-0027563 tanggal 30 Januari                       2024.
   2024.

   Pada periode 31 Januari 2024, Perusahaan                         In the period January 31, 2024, the Company
   menghentikan pengakuan aset dan liabilitas TJT                   derecognized TJT’s assets and liabilities in the
   dalam laporan keuangan konsolidasian interim                     interim consolidated financial statements as a result
   sebagai akibat kehilangan pengendalian pada                      of the loss of control over the subsidiary.
   entitas anak. Perusahaan mengakui sisa investasi                 The Company recognized the remining 65.12%
   pada TJT sebesar 65,12%, pada nilai wajarnya                     investment in TJT, at fair value,as an investment in a
   sebagai investasi pada ventura bersama. Grup                     joint venture. The Group recognized the gain from
   mengakui keuntungan penjualan Sebagian TJT                       the sale of part of TJT amounting to
   sebesar Rp250.389.348.334 sebagai pendapatan                     Rp250,389,348,334 as net other income (expense)
   (beban) lain-lain bersih (Catatan 47).                           (Note 47).

   PT Kresna Kusuma Dyandra Marga (KKDM) -                          PT Kresna Kusuma Dyandra Marga (KKDM) -
   (WTR - RDPT)                                                     (WTR - RDPT)

   Pendirian KKDM (kepemilikan tidak langsung                       The estabilishment of KKDM (indirect ownership
   melalui WTR) adalah sesuai Akta Pendirian dari                   through WTR) was based on notarial deed
   Notaris Mudofir Hadi S.H, No. 94 tanggal 20                      No. 94 dated December 20, 1996 of notary Mudofir
   Desember 1996. WTR memiliki penyertaan 60% dari                  Hadi, S.H. WTR owns 60% of paid up capital of
   modal disetor KKDM.                                              KKDM.

   Berdasarkan      Akta     Notaris    No.      37                 Based      on      Notarial     Deed      No. 37
   tanggal 18 November 2020 oleh Ir. Nanette                        dated November 18, 2020 by Ir. Nanette Cahyanie
   Cahyanie Handari Adi Warsito, S.H., WTR menjual                  Handari Adi Warsito, S.H., WTR sold its 30%
   30% kepemilikan saham di KKDM kepada RDPT                        ownershipKKDM to Limited Investment Fund
   dengan    harga    sebesar    Rp550.000.000.000.                 (RDPT) at a price of Rp550,000,000,000.
   Perusahaan mengakui keuntungan dari penjualan                    The Company’s gain on sale amounting to
   tersebut sebesar Rp104.611.720.601 sebagai                       Rp104,611,720,601 which was recorded as other
   penghasilan lainnya. Kepemilikan saham WTR di                    income. WTR share ownership in KKDM becomes
   KKDM menjadi sebesar 70% setelah penjualan                       70% after the sale of shares transaction.
   tersebut.

   Pemegang saham sepakat bahwa pengelolaan                         Shareholders agree that the management of
   KKDM dikelola secara bersama oleh RDPT dan                       KKDM managed jointly by RDPT and WTR in
   WTR sesuai dengan Perubahan Pertama atas                         accordance with the First Amendment on
   Perjanjian antar Pemegang Saham PT Kresna                        the   Agreement   between   the   shareholders
   Kusuma Dyandra Marga tanggal 17 November                         of PT Kresna Kusuma Dyandra Marga on
   2020. Berdasarkan kesepakatan bahwa KKDM                         November 17, 2020. Based on the agreement that

                                                           - 93 -
Page 97
PT WASKITA KARYA (PERSERO) Tbk                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                          (Expressed in Rupiah, unless otherwise stated)

      dikelola bersama, maka WTR tidak melakukan                        KKDM is jointly managed, WTR does                    not
      konsolidasi terhadap laporan keuangan KKDM.                       consolidate KKDM's financial statements.

      Berdasarkan Akta Jual Beli Saham No. 39 dari                      Based on the Deed of Sale and Purchase of Shares
      Notaris Insinyur Nanette Cahyanie Handari Adi                     No. 39 from Notary Engineer Nanette Cahyanie
      Warsito tanggal 18 November 2021. Berdasarkan                     Handari Adi Warsito dated November 18, 2021.
      Akta Jual beli saham tersebut, WTR memiliki opsi                  Based on the Deed of Sale and Purchase of shares,
      beli atas saham KKDM yang dimiliki oleh Reksa                     WTR has a purchase option on KKDM shares
      Dana Penyertaan Terbatas Ekuitas Danareksa Toll                   owned by the Danareksa Toll Road Equity Limited
      Road (RDPT EDTR). Pelaksanaan opsi beli tahun I                   Participation  Mutual    Fund     (RDPT      EDTR).
      sebanyak 53.785.872 lembar saham atau 2,1%                        The exercise of the buy option in the first year was
      saham     kepemilikan   RDPT    EDTR    dengan                    53,785,872 shares or 2.1% of the shares owned by
      Rp47.391.269.678.                                                 RDPT EDTR with a transaction value of
                                                                        Rp47,391,269,678.

      Berdasarkan Akta Jual Beli Saham No. 21 dari                      Based on the Deed of Sale and Purchase of Shares
      Notaris Insinyur Nanette Cahyanie Handari Adi                     No. 21 from Notary Engineer Nanette Cahyanie
      Warsito tanggal 17 November 2022. Berdasarkan                     Handari Adi Warsito dated November 17, 2022.
      Akta Jual beli saham tersebut, WTR memiliki opsi                  Based on the Deed of Sale and Purchase of shares,
      beli atas saham KKDM yang dimiliki oleh Reksa                     WTR has a purchase option on KKDM shares
      Dana Penyertaan Terbatas Ekuitas Danareksa Toll                   owned by the Danareksa Toll Road Equity Limited
      Road (RDPT EDTR). Pelaksanaan opsi beli tahun II                  Participation  Mutual    Fund     (RDPT      EDTR).
      sebanyak 53.785.872 lembar saham atau 2,1%                        The exercise of the buy option in the first year was
      saham kepemilikan RDPT EDTR dengan nilai                          53,785,872 shares or 2.1% of the shares owned by
      transaksi sebesar Rp52.872.587.893.                               RDPT EDTR with a transaction value of
                                                                        Rp52,872,587,893.

      Berdasarkan Akta Jual Beli Saham No. 22 dari                      Based on the Deed of Sale and Purchase of Shares
      Notaris Insinyur Nanette Cahyanie Handari Adi                     No. 22 from Notary Engineer Nanette Cahyanie
      Warsito tanggal 15 November 2023. Berdasarkan                     Handari Adi Warsito dated November 15, 2023.
      Akta Jual beli saham tersebut, WTR memiliki opsi                  Based on the Deed of Sale and Purchase of shares,
      beli atas saham KKDM yang dimiliki oleh Reksa                     WTR has a purchase option on KKDM shares
      Dana Penyertaan Terbatas Ekuitas Danareksa Toll                   owned by the Danareksa Toll Road Equity Limited
      Road (RDPT EDTR). Pelaksanaan opsi beli tahun III                 Participation  Mutual    Fund     (RDPT      EDTR).
      sebanyak 53.785.872 lembar saham atau 2,1%                        The exercise of the buy option in the first year was
      saham kepemilikan RDPT EDTR dengan nilai                          53,785,872 shares or 2.1% of the shares owned by
      transaksi sebesar Rp58.425.441.319.                               RDPT EDTR with a transaction value of
                                                                        Rp58,425,441,319.
      Tidak terdapat perubahan kepemilikan atau hak                     There has been no change in the Group’s ownership
      suara Grup untuk tahun-tahun yang dilaporkan.                     or voting interests in these joint ventures for
                                                                        the reported years.

16.    PROPERTI INVESTASI                                          16. INVESTMENT PROPERTIES
                                                30 September/          31 Desember/
                                              September 30, 2024     December 31, 2023
                                                     Rp                     Rp
       Harga Perolehan                                                                                              Acquisition Cost
        Tanah                                     72.307.454.963         72.307.454.963                                       Land
        Bangunan                                 219.315.019.119        219.315.019.119                                    Building
       Jumlah Harga Perolehan                    291.622.474.082        291.622.474.082                      Total Acquisition Cost
       Nilai Wajar                                                                                                       Fair Value
        Tanah                                     86.682.474.975         86.682.474.975                                       Land
        Bangunan                                 230.857.959.538        230.857.959.538                                   Building
       Total Nilai Wajar                         317.540.434.513        317.540.434.513                             Total Fair Value
       Jumlah Properti Investasi                 317.540.434.513        317.540.434.513                 Total Investment Properties


      Properti investasi merupakan proyek gedung                        Investment properties consist of office building and
      perkantoran dan hotel Cawang, yang berlokasi di                   Cawang hotel project, located in Jalan MT Haryono
      Jalan MT Haryono Cawang, dengan luas lahan                        Cawang, lying on a land area of 3,650 m2.
      sebesar 3.650 m2.



                                                            - 94 -
Page 98
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)

   Pada tanggal 30 September 2024 dan 31 Desember                                     As of September 30, 2024 and December 31, 2023,
   2023 nilai wajar properti investasi sebesar                                        the fair value of the investment properties amounting
   Rp317.540.434.513.                                                                 to Rp317,540,434,513.

17. INVESTASI JANGKA PANJANG LAINNYA                                            17. OTHER LONG TERM INVESTMENTS
                                                                                                         30 September/                           31 Desember/
                                                                                                       September 30, 2024                      December 31, 2023
                                                                                                              Rp                                      Rp

     PT Citra Waspphutowa                                                                                          328.859.297.616                 328.859.297.616
     PT Prima Multi Terminal                                                                                       302.622.000.000                 302.622.000.000
     PT Citra Karya Jabar Tol                                                                                      131.250.000.000                 131.250.000.000
     PT Hutama Marga Waskita                                                                                        79.402.869.204                  79.402.869.204
     PT Jasamarga Jogja Bawen                                                                                       13.500.000.000                  13.500.000.000
     PT PP Sinergi Banjaratma                                                                                       12.684.923.000                  12.684.923.000
     PT Jasamarga Gedebage Cilacap                                                                                   1.219.100.000                   1.219.100.000
     PT Jasamarga Probolinggo Banyuwangi                                                                               200.000.000                     200.000.000
     Jumlah/ Total                                                                                                 869.738.189.820                 869.738.189.820


   Rincian mutasi investasi jangka panjang lainnya                                    The details of movement in other long-term
   sebagai berikut:                                                                   investments are as follows:
                                                                                   30 September/ September 30, 2024
                                            Persentase
                                           Kepemilikan/                                  Penambahan
                                           Percentage of       Saldo Awal/              (Pengurangan)/                 Reklasifikasi/               Saldo Akhir/
                                            Ownership       Beginning Balance         Addition (Deduction)            Reclassification             Ending Balance
                                                %                  Rp                          Rp                           Rp                           Rp
     PT Citra Waspphutowa                           13,47        328.859.297.616                              --                          --           328.859.297.616
     PT Prima Multi Terminal                         1,01        302.622.000.000                              --                          --           302.622.000.000
     PT Citra Karya Jabar Tol                        5,63        131.250.000.000                              --                          --           131.250.000.000
     PT Hutama Marga Waskita                         0,41         79.402.869.204                              --                          --            79.402.869.204
     PT Jasamarga Jogja Bawen                        7,91         13.500.000.000                              --                          --            13.500.000.000
     PT PP Sinergi Banjaratma                        6,21         12.684.923.000                              --                          --            12.684.923.000
     PT Jasamarga Gedebage Cilacap                  20,00          1.219.100.000                              --                          --             1.219.100.000
     PT Jasamarga Probolinggo Banyuwangi             0,02            200.000.000                              --                          --               200.000.000
     Jumlah/ Total                                               869.738.189.820                              --                          --           869.738.189.820


                                                                                   31 Desember/ December 31, 2023
                                            Persentase
                                           Kepemilikan/                                 Penambahan
                                           Percentage of       Saldo Awal/             (Pengurangan)/                 Reklasifikasi/               Saldo Akhir/
                                            Ownership       Beginning Balance        Addition (Deduction)            Reclassification             Ending Balance
                                                %                  Rp                         Rp                           Rp                           Rp
     PT Citra Waspphutowa                           13,47        328.859.297.616                             --                          --          328.859.297.616
     PT Prima Multi Terminal                         1,01        302.622.000.000                             --                          --          302.622.000.000
     PT Citra Karya Jabar Tol                        5,63        131.250.000.000                             --                          --          131.250.000.000
     PT Hutama Marga Waskita                         0,50         79.402.869.204                             --                          --           79.402.869.204
     PT Jasamarga Jogja Bawen                        7,91         13.500.000.000                             --                          --           13.500.000.000
     PT PP Sinergi Banjaratma                        6,21         12.684.923.000                             --                          --           12.684.923.000
     PT Jasamarga Gedebage Cilacap                  20,00          1.219.100.000                             --                          --            1.219.100.000
     PT Jasamarga Probolinggo Banyuwangi             0,07            200.000.000                             --                          --              200.000.000
     Jumlah/ Total                                               869.738.189.820                             --                          --          869.738.189.820


   PT Citra Waspphutowa (CW)                                                          PT Citra Waspphutowa (CW)
   WTR memiliki penyertaan sebesar 12,5% dari                                         WTR has a participation of 12.5% of the paid-in
   modal PT Citra Waspphutowa atau sebesar                                            capital of PT Citra Waspphutowa amounting to
   Rp125.000.000.000.     PT     Citra  Waspphutowa                                   R125,000,000,000. PT Citra Waspphutowa was
   didirikan sesuai Akta Pendirian No. 10 dari Notaris                                established based on Notarial Deed No. 10 by Drs.
   Drs. Soegeng Santosa, S.H., M.H., tanggal                                          Soegeng Santosa, S.H., M.H., dated January 13,
   13 Januari 2006, bergerak di bidang pengusahaan                                    2006 and is engaged in toll road actvities.
   jalan tol.
   Berdasarkan akta No. 24 tanggal 13 Oktober 2022                                    Based on deed No. 24 dated October 13, 2022 by
   dari Notaris Herdimansyah Chaidirsyah, S.H.,                                       Notary Herdimansyah Chaidirsyah, S.H., regarding
   perihal tambahan modal ditempatkan dan disetor                                     the additional issued and paid-up capital of
   PT Citra Waspphutowa. WTR tidak melakukan                                          PT Citra Waspphutowa, WTR did not make capital
   setoran modal kepada PT Citra Waspphutowa,                                         injections to PT Citra Waspphutowa, as a result of
   sebagai akibat hal tersebut kepemilikan saham WTR                                  this, WTR share ownership was diluted to 13.47%.
   terdilusi menjadi sebesar 13,47%.
                                                                         - 95 -
Page 99
PT WASKITA KARYA (PERSERO) Tbk                                             PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                 FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                           FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                 ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                         AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                  (Expressed in Rupiah, unless otherwise stated)


   PT Prima Multi Terminal (PMT)                                 PT Prima Multi Terminal (PMT)
   Perusahaan memiliki penyertaan sebesar 20% pada               The Company has 20% investment in PMT or
   PMT atau setara Rp26.100.000.000. Perusahaan ini              equivalent to Rp26,100,000,000. PMT was
   didirikan sesuai Akta Pendirian No. 4 tanggal 26              established under Notarial deed of Establishment
   September 2014 dari Notaris Tuti Sumarni, S.H.,               No. 4 dated September 26, 2014 of Notary Tuti
   M.H., bergerak di bidang perdagangan dan jasa.                Sumarni, S.H., M.H., and is engaged in trading and
                                                                 services.
   Berdasarkan Akta No. 18 tanggal 24 Oktober 2022               Based on Notarial deed No. 18 dated October 24,
   oleh   notaris  Nanda      Fauzan     Iwan,   PMT             2022 by notary Nanda Fauzan Iwan, PMT increased
   meningkatkan modal disetor dan ditempatkan yang               the paid-in and issued capital which was entirely
   seluruhnya diambil bagian oleh Pelindo dengan cara            paid up by Pelindo by converting a shareholder loan
   konversi pinjaman pemegang saham sebesar                      amounting to Rp466,878,000,000 and paid-in capital
   Rp466.878.000.000      dan    penyetoran    modal             in cash amounting to Rp2,750,123,049,346.
   tunai sebesar Rp2.750.123.049.346. Kepemilikan                Company’s ownership in PMT became 1.01%.
   Perusahaan di PMT menjadi 1,01%.
   PT Citra Karya Jabar Tol (CKJT)                               PT Citra Karya Jabar Tol (CKJT)
   WTR memiliki penyertaan sebesar 15% dari modal                WTR has 15% investment in CKJT’s paid-in capital
   CKJT atau setara dengan Rp15.000.000.000. CKJT                or equivalent to Rp15,000,000,000. CKJT was
   didirikan sesuai Akta Pendirian No. 18 tanggal 30             established based on the notarial deed No. 18 dated
   Januari 2017 dari notaris Dessi, S.H., M.Kn.,                 January 30, 2017 by notary Dessi, S.H., M.Kn. and
   bergerak di bidang pengusahaan jalan tol.                     engaged in toll road concession.
   Berdasarkan    akta   No.    47    oleh   Notaris             Based on deed no. 47 by Notary Herdimansyah
   Herdimansyah Chaindirsyah, S.H. tanggal 21 Juli               Chaindirsyah, S.H. On July 21, 2023, WTR's
   2023, penyertaan WTR pada CKJT menjadi 5,63%                  investment in CKJT became 5.63% due to an
   akibat peningkatan modal disetor dan ditempatkan              increase in paid-in capital and placement by other
   oleh pemegang saham lain.                                     shareholders.
   PT Hutama Marga Waskita (HMW)                                 PT Hutama Marga Waskita (HMW)
   WTR, entitas anak, memiliki penyertaan sebesar                WTR, a subsidiary, has 30% investment in HMW or
   30% dari modal HMW atau setara dengan                         equivalent to Rp4,500,000,000. HMW was
   Rp4.500.000.000. HMW didirikan sesuai Akta                    established based on Notarial deed No. 24 dated
   Pendirian No. 24 tanggal 20 Februari 2017 dari                February 20, 2017 by Notary Ni Nyoman Rai
   Notaris Ni Nyoman Rai Sumawati, S.H., M.Kn,                   Sumawati, S.H., M.Kn and is engaged in toll road
   bergerak di bidang pengusahaan jalan tol.                     concession.
   Berdasarkan akta No. 02 oleh Notaris Ni Nyoman                Based on deed no. 02 by Notary Ni Nyoman Rai
   Rai Sumawati, S.H., M.Kn., tanggal 8 Mei 2024,                Sumawati, S.H., M.Kn., dated May 8, 2024, WTR's
   penyertaan WTR pada HMW menjadi 0,41% akibat                  participation in HMW became 0.41% due to an
   peningkatan modal disetor dan ditempatkan oleh                increase in paid-in and issued capital by the majority
   pemegang saham mayoritas.                                     shareholder.
   PT Jasamarga Jogja Bawen                                      PT Jasamarga Jogja Bawen
   Perusahaan memiliki penyertaan sebesar 12,50%                 The Company has 12.50% investments in
   pada PT Jasamarga Jogja Bawen atau setara                     PT Jasamarga Jogja Bawen or equivalent to
   dengan Rp4.625.000.000. PT Jasamarga Jogja                    Rp4,625,000,000. PT Jasamarga Jogja Bawen
   Bawen didirikan sesuai Akta Pendirian No. 11                  was     established under Notarial deed of
   tanggal 11 November 2020 dari Notaris Ni Nyoman               Establishment No. 11 dated November 11, 2020 of
   Rai Sumawati, S.H., M.Kn.                                     Notary Ni Nyoman Rai Sumawati, S.H., M.Kn.
   Berdasarkan akta No. 05 oleh notaris Inne                     Based on deed No. 05 by notary Inne Kusumawati,
   Kusumawati, S.H. di Kota Tangerang Selatan,                   S.H. in South Tangerang City, on April 18, 2023
   tanggal 18 April 2023, terdapat peningkatan modal             there was an increase in the authorized capital and
   dasar dan modal disetor PT Jasamarga Jogja                    paid-up capital of PT Jasamarga Jogja Bawen so
   Bawen      sehingga      prosentase    penyertaan             thatthe percentage of the Company's participation in
   Perusahaan pada PT Jasamarga Jogja Bawen                      PT Jasamarga Jogja Bawen became 7.91%.
   menjadi 7,91%.



                                                        - 96 -
Page 100
PT WASKITA KARYA (PERSERO) Tbk                                                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                    (Expressed in Rupiah, unless otherwise stated)


   PT PP Sinergi Banjaratma                                                                      PT PP Sinergi Banjaratma
   Perusahaan memiliki penyertaan sebesar 20% pada                                               The     Company     has   20%     investment   in
   PT PP Sinergi Banjaratma atau setara dengan                                                   PT PP Sinergi Banjaratma or equivalent to
   Rp12.684.923.000. PT PP Sinergi Banjartama                                                    Rp12,684,923,000. PT PP Sinergi Banjartama was
   didirikan sesuai Akta Pendirian No. 2 tanggal                                                 established under Notarial deed of Establishment
   7 Februari 2019 dari Notaris Ni Nyoman Rai                                                    No. 2 dated February 7, 2019 of Notary Ni Nyoman
   Sumawati, S.H., M.Kn.                                                                         Rai Sumawati, S.H., M.Kn.

   Berdasarkan akta No. 5 oleh notaris Ni Nyoman Rai                                             Based on deed no. 5 by notary Ni Nyoman Rai
   Sumawati,    S.H.,M.Kn.    di   Jakarta,   tanggal                                            Sumawati, S.H., M.Kn. in Jakarta, on August 29,
   29 Agustus 2023, terdapat peningkatan modal dasar                                             2023 there was an increase in the authorized capital
   dan modal disetor PT PP Sinergi Banjartama                                                    and paid-up capital of PT PP Sinergi Banjartama so
   sehingga prosentase penyertaan perusahaan pada                                                that the percentage of the Company's participation in
   PT PP Sinergi Banjartama menjadi 6,21%.                                                       PT PP Sinergi Banjartama became 6.21%.

   PT Jasamarga Gedebage Cilacap (JGC)                                                           PT Jasamarga Gedebage Cilacap (JGC)

   Pendirian PT Jasamarga Gedebage Cilacap adalah                                                The establishment of PT Jasamarga Gedebage
   sesuai   dengan    akta   notaris     Ni    Nyoman                                            Cilacap was based on notarial deed No. 8 dated
   Rai Sumawati, S.H., M.Kn. No. 8 tanggal                                                       January 28, 2022 of notary Ni Nyoman Rai
   28 Januari 2022. Akta pendirian ini telah mendapat                                            Sukmawati, S.H., M.Kn. This notarial deed has
   pengesahan     Menteri     Hukum        dan    Hak                                            been approved by the Minister of Law and
   Asasi Manusia sesuai dengan Surat Keputusan                                                   Human      Rights  through     decision    letter
   No. AHU-0007639.AH.0101.TAHUN 2022 tanggal                                                    No. AHU-0007639.AH.0101.TAHUN 2022 dated
   29 Januari 2022. Perusahaan memiliki penyertaan                                               January 29,2022. The Company has 20%
   sebesar    20%     pada     JGC      atau    setara                                           investment    in  JGC     or    equivalent     to
   Rp1.219.100.000.                                                                              Rp1,219,100,000.

   PT Jasamarga Probolinggo Banyuwangi (JPB)                                                     PT Jasamarga Probolinggo Banyuwangi (JPB)

   WTR, entitas anak, memiliki penyertaan sebesar                                                WTR, a subsidiary, has 40% investment in JPB or
   40% pada JPB setara Rp200.000.000, berdasarkan                                                equivalent to Rp200,000,000, based on Notarial
   Akta notaris No. 21 tanggal 29 Desember 2017 dari                                             deed No. 21 dated December 29, 2017 of Notary Ni
   Notaris Ni Nyoman Rai Sumawati, SH., M.Kn.                                                    Nyoman Rai Sumawati, SH., M.Kn.

   Berdasarkan akta No. 10 oleh Notaris Rina Utami                                               Based on deed no. 10 by Notary Rina Utami
   Djauhari, S.H. tanggal 27 Agustus 2024, penyertaan                                            Djauhari, S.H. on August 27, 2024, WTR's
   WTR pada JPB menjadi 0,02% akibat peningkatan                                                 investment in JPB will become 0.02% due to an
   modal disetor dan ditempatkan oleh pemegang                                                   increase in paid-in capital and placement by other
   saham lain.                                                                                   shareholders.

   Manajemen berpendapat bahwa tidak terdapat                                                    Management believes that there is no significant
   perbedaan yang signifikan antara jumlah tercatat                                              difference between book value and the fair value.
   dengan nilai wajarnya.

18. ASET TETAP - BERSIH                                                                     18. FIXED ASSETS - NET

                                                                         30 September/ September 30, 2024


                               Saldo Awal/         Penambahan/         Reklasifikasi/         Pengurangan/        Revaluasi/         Saldo Akhir/
                            Beginning Balance        Addition         Recassification          Deduction         Revaluation        Ending Balance
                                   Rp                  Rp                   Rp                    Rp                 Rp                   Rp

     Biaya Perolehan                                                                                                                                         Acquisition Cost
      Tanah                    2.408.381.009.307      2.525.390.500                    --      194.999.790.500                 --     2.215.906.609.307                 Land
      Gedung dan Pabrik        2.701.624.072.162      1.078.964.000       16.060.666.655       236.818.560.718                 --     2.481.945.142.099    Building and Plant
      Perlengkapan Kantor        118.613.758.372      1.936.558.100          856.893.488         1.059.118.311                 --       120.348.091.649       Office Supplies
      Peralatan Proyek         5.116.041.504.961      1.061.494.059       28.035.848.594       136.726.134.958                 --     5.008.412.712.656   Project Equipments
      Kendaraan                   12.396.119.323        295.500.000                    --          765.609.317                 --        11.926.010.006              Vehicles
     Jumlah                  10.357.056.464.125       6.897.906.659       44.953.408.737       570.369.213.804                 --     9.838.538.565.717                 Total




                                                                                    - 97 -
Page 101
PT WASKITA KARYA (PERSERO) Tbk                                                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                             (Expressed in Rupiah, unless otherwise stated)

                                                                                   30 September/ September 30, 2024


                                        Saldo Awal/         Penambahan/          Reklasifikasi/        Pengurangan/         Revaluasi/           Saldo Akhir/
                                     Beginning Balance        Addition          Recassification         Deduction          Revaluation          Ending Balance
                                            Rp                  Rp                    Rp                   Rp                  Rp                     Rp


     Aset dalam Pembangunan                                                                                                                                                   Assets in Progress
      Gedung, Pabrik, dan                                                                                                                                                          Building, Plant
      Peralatan Proyek                    85.649.300.527       3.625.246.657       (44.953.408.737)                   --                   --        44.321.138.447          Project Equipments
     Akumulasi Penyusutan                                                                                                                                               Accumulated Depreciation
      Gedung dan Pabrik                   679.090.223.904     73.866.388.627                      --                  --                   --        752.956.612.531          Building and Plant
      Perlengkapan Kantor                  95.659.232.155      9.895.747.081                      --        637.991.473                    --        104.916.987.763             Office Supplies
      Peralatan Proyek                  4.071.801.601.054    232.154.106.994                      --    134.349.002.669                    --      4.169.606.705.379         Project Equipments
      Kendaraan                            11.818.363.687        520.562.376                      --        515.478.064                    --         11.823.447.999                    Vehicles
     Jumlah                             4.858.369.420.800    316.436.805.078                      --    135.502.472.206                    --      5.039.303.753.672                         Total
     Akumulasi Penurunan Nilai                                                                                                                                           Accumulated Impairment
      a. Biaya Perolehan                                                                                                                                                      a. Acquisition Cost
       Tanah                             223.514.951.077                   --                    --     223.514.951.077                    --                     --                         Land
       Pabrik                             51.016.131.126                   --                    --      44.053.977.800                    --         6.962.153.326                          Plant
       Peralatan Proyek                  252.091.814.111                   --      (13.965.271.276)         502.857.150                    --       265.554.228.237           Project Equipments
      b. Aset Dalam Pembangunan                                                                                                                                             b. Assets in Progress
      Gedung, Pabrik, dan                                                                                                                                                          Building, Plant
       Peralatan Proyek                   50.073.448.743                   --       13.965.271.276                    --                   --        36.108.177.467          Project Equipments
       Jumlah                            576.696.345.057                   --                    --     268.071.786.027                    --       308.624.559.030                           Total
     Nilai Buku                         5.007.639.998.795                                                                                          4.534.931.391.462                  Book Value




                                                                                    31 Desember/ December 31, 2023



                                        Saldo Awal/         Penambahan/          Reklasifikasi/        Pengurangan/         Revaluasi/           Saldo Akhir/
                                     Beginning Balance       Addition           Recassification         Deduction          Revaluation          Ending Balance
                                            Rp                 Rp                    Rp                    Rp                  Rp                     Rp
     Biaya Perolehan                                                                                                                                                            Acquisition Cost
      Tanah                             2.264.204.161.364                  --           404.000.000                   --     143.772.847.943      2.408.381.009.307                       Land
      Gedung dan Pabrik                 2.821.301.711.994        740.450.000        20.885.701.930                    --   (141.303.791.762)      2.701.624.072.162          Building and Plant
      Perlengkapan Kantor                 113.780.591.564      6.360.527.058        (1.527.360.250)                   --                   --       118.613.758.372             Office Supplies
      Peralatan Proyek                  5.081.554.489.149        934.621.287        83.427.878.970       49.875.484.445                    --     5.116.041.504.961         Project Equipments
      Kendaraan                            12.148.619.323        247.500.000                      --                  --                   --        12.396.119.323                    Vehicles
     Jumlah                           10.292.989.573.394       8.283.098.345       103.190.220.650       49.875.484.445       2.469.056.181      10.357.056.464.125                        Total
     Aset dalam Pembangunan                                                                                                                                                  Assets in Progress
      Gedung, Pabrik, dan                                                                                                                                                        Building, Plant
       Peralatan Proyek                  200.896.888.113       3.920.884.450     (119.168.472.036)                    --                   --        85.649.300.527         Project Equipments
     Akumulasi Penyusutan                                                                                                                                              Accumulated Depreciation
      Gedung dan Pabrik                   554.766.851.091    143.836.831.880        (1.507.997.410)                   --    (18.005.461.657)        679.090.223.904                   Building
      Perlengkapan Kantor                  97.463.837.012     15.485.576.766       (17.290.181.623)                   --                  --         95.659.232.155            Office Supplies
      Peralatan Proyek                  3.636.006.348.550    485.561.919.792              3.281.399      49.769.948.687                   --      4.071.801.601.054        Project Equipments
      Kendaraan                            11.458.347.933        360.015.754                      --                  --                  --         11.818.363.687                   Vehicles
     Jumlah                             4.299.695.384.586    645.244.344.192       (18.794.897.634)      49.769.948.687     (18.005.461.657)      4.858.369.420.800                        Total

     Akumulasi Penurunan Nilai                                                                                                                                           Accumulated Impairment
      Biaya Perolehan                                                                                                                                                           Acquisition Cost
       Tanah                                           --    223.514.951.077                      --                  --                   --       223.514.951.077                         Land
       Pabrik                              6.962.153.326      44.053.977.800                      --                  --                   --        51.016.131.126                         Plant
       Peralatan Proyek                                --    252.091.814.111                      --                  --                   --       252.091.814.111          Project Equipments
     Aset Tetap Dalam Penyelesaian                                                                                                                                       Construction in Progress
      Gedung, Pabrik, dan                                                                                                                                                         Building, Plant
       Peralatan Proyek                   50.073.448.743                   --                     --                  --                   --        50.073.448.743         Project Equipments
       Jumlah                             57.035.602.069     296.145.791.911                      --                  --                   --       576.696.345.057                          Total
     Nilai Buku                         6.194.191.076.921                                                                                         5.007.639.998.795                  Book Value


   Berdasarkan     keputusan     Dewan      Direksi                                                       Based on the decision of the Board of Directors
   No. 16/SK/WK/2024 tanggal 7 Februari 2024                                                              No. 16/SK/WK/2024 dated 7 February 2024
   tentang Penjualan Aset Tetap Peralatan dan                                                             concerning the Sale of Fixed Assets, Equipment and
   Kendaraan Proyek PT Waskita Karya (Persero) Tbk                                                        Vehicles for the PT Waskita Karya (Persero) Tbk
   Tahun 2024 bahwa telah diputuskan untuk                                                                Project in 2024, that it has been decided to sell fixed
   melakukan penjualan aset tetap melalui Kantor                                                          assets through the Padang State Property Services
   Pelayanan Kekayaan Negara dan Lelang Padang                                                            and Auction Office with a acquisition value of
   dengan nilai perolehan sebesar Rp7.141.574.147,                                                        Rp7.141,574,147, the accumulated depreciation
   nilai    akumulasi       depresiasi     sebesar                                                        value is Rp7,141,574,087, and the gain on sale of
   Rp7.141.574.087, dan keuntungan penjualan aset                                                         assets is Rp623,745,046.
   sebesar Rp623.745.046.

   Berdasarkan Memo persetujuan Direksi dari WBP                                                          Based on the Approval Memo WBP Director’s
   No. 24.2/MP/WBP/DIR/2024 tanggal 4 Maret 2024                                                          No. 24.2/MP/WBP/DIR/2024 dated March 4, 2024, it
                                                                                              - 98 -
Page 102
PT WASKITA KARYA (PERSERO) Tbk                                                                                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                   (Expressed in Rupiah, unless otherwise stated)

   telah disetujui penghapusan aset tetap atas                                                                                  has been approved to write off fixed assets upon
   divestasi. Divestasi dilakukan melalui Kantor                                                                                divestment. Divestment is carried out through
   Pelayanan    Kekayaan    Negara    dan   Lelang                                                                              the Purwakarta State Assets and Auction Services
   Purwakarta, dengan informasi lot lelang sebagai                                                                              Office, with auction lot information as follows:
   berikut:
                                                                                                                                                                                                             Akumulasi Penyusutan/
            Nomor Risalah Lelang/                Tanggal Lelang/            Kode Lot Lelang/            Nama Barang yang dilelang/                 Nilai Penawaran Tertinggi/        Harga Perolehan/
                                                                                                                                                                                                                 Depreciation
           Auction Minutes Number                 Auction Date              Auction Lot Code           Name of item being auctioned                    Highest Offer Value           Acquisition Value
                                                                                                                                                                                                                 Accumulated
                                                                                                   11 Kendaraan bermotor dan barang
                                                                                                   bergerak lainnya di Kabupaten
     Risalah Lelang 133/08.04/2024-02              4 Maret 2024                 BKDGQX             Purwakarta/11 Motorized vehicles                             3.790.003.000             12.158.417.050                  12.158.417.050
                                                                                                   and other movable goods in
                                                                                                   Purwakarta Regency
                                                                                                   WSBP Paket 2 : Genset, Batching
                                                                                                   Plant, Sand Washing, Dump Truck
     Risalah Lelang 134/08.04/2024-02              4 Maret 2024                 RIUZWF             Hino/WSBP Package 2: Generator,                                 871.260.000             7.943.378.220                    7.943.378.220
                                                                                                   Batching Plant, Sand Washing, Hino
                                                                                                   Dump Truck
                                                                                                   5 unit genset Perkins-Stamford dan
                                                                                                   Cummins - Stamford kapasitas 250
                                                                                                   KVA 350 KVA dan 363 KVA, 1 unit
                                                                                                   Sand Washing Golden Star kapasitas
     Risalah Lelang 135/08.04/2024-02              4 Maret 2024                 IP3XUQ             50/5 units of Perkins-Stamford and                              865.376.580             4.168.519.515                    4.168.519.515
                                                                                                   Cummins - Stamford generators with
                                                                                                   a capacity of 250 KVA, 350 KVA and
                                                                                                   363 KVA, 1 unit of Sand Washing
                                                                                                   Golden Star with a capacity of 50
                                                                                                   6 kendaraan bermotor dan barang
                                                                                                   bergerak lainnya di Kabupaten
     Risalah Lelang 136/08.04/2024-02              4 Maret 2024                 SKZRNZ             Purwakarta/6 motorized vehicles and                          1.880.185.000             12.518.981.086                  12.518.981.086
                                                                                                   other movable goods in Purwakarta
                                                                                                   Regency
                                                                                                   WSBP Paket 5: Genset, Wheel Loader,
                                                                                                   Batching Plant, Truck Mixer/WSBP
     Risalah Lelang 137/08.04/2024-02              4 Maret 2024                 GVRNJY                                                                          1.942.690.000             14.477.803.712                  14.477.803.712
                                                                                                   Package 5: Generator, Wheel Loader,
                                                                                                   Batching Plant, Truck Mixer

                                                                                                   5 kendaraan bermotor dan barang
                                                                                                   bergerak lainnya    di Kabupaten
     Risalah Lelang 138/08.04/2024-02              4 Maret 2024                 NLPDBD             Purwakarta/5 motorized vehicles and                          1.878.649.000             14.848.779.553                  14.848.779.553
                                                                                                   other movable goods in Purwakarta
                                                                                                   Regency
                                                                      Jumlah/Total                                                                             11.228.163.580             66.115.879.136                  66.115.879.136


   Berdasarkan Memo persetujuan Direksi dari WBP                                                                                Based on the Approval Memo WBP Director’s
   No. 58/MP/WBP/DIR/2024 tanggal 31 Juli 2024                                                                                  No. 58/MP/WBP/DIR/2024 dated July 31, 2024, it
   telah disetujui penghapusan aset tetap atas                                                                                  has been approved to write off fixed assets upon
   divestasi. Divestasi dilakukan melalui Kantor                                                                                divestment. Divestment is carried out through
   Pelayanan    Kekayaan    Negara    dan   Lelang                                                                              the Purwakarta State Assets and Auction Services
   Purwakarta, dengan informasi lot lelang sebagai                                                                              Office, with auction lot information as follows:
   berikut:

           Nomor Risalah Lelang/         Tanggal Lelang/     Kode Lot Lelang/         Nama Barang yang dilelang/          Nilai Penawaran Tertinggi/   Harga Perolehan/      Akumulasi Penyusutan/     Nilai Penurunan/       Nilai Buku/
          Auction Minutes Number          Auction Date       Auction Lot Code        Name of item being auctioned             Highest Offer Value      Acquisition Value    Depreciation Accumulated      Impairment          Book Value

                                                                                  1 unit Batching Plant merk Detede, 1
                                                                                  unit Dump Truck merk HINO, 4 unit
                                                                                  Genset merk Cummins Stamford, 1
                                                                                  unit Sand Washing merk Golden Star,
     Risalah Lelang 480/08.04/2024-02      19 Juli 2024            LWGAPR                                                              2.150.000.000       12.174.561.328             11.826.576.768          138.879.977      209.104.583
                                                                                  1 unit Truck Mixer merk Sany, 2 unit
                                                                                  Truck Mixer merk HINO, 2 unit Truck
                                                                                  Mixer merk UD Truck, 1 unit Wheel
                                                                                  Loader merk Liugong
                                                                                  1 unit Excavator merk Komatsu, 7 unit
                                                                                  Genset merk Cummins Stamford, 3
                                                                                  unit Sand Washing merk Golden Star,
     Risalah Lelang 481/08.04/2024-02      19 Juli 2024            DOGJFT         2 unit Truck Mixer merk Sany, 1 unit                 1.800.000.000       11.408.050.440             11.042.065.773                  -        365.984.667
                                                                                  Truck Mixer merk HINO, 1 unit Truck
                                                                                  Mixer merk UD Truck, 1 unit Wheel
                                                                                  Loader merk Liugong
                                                                                  1 unit Excavator merk Hyundai, 8 unit
                                                                                  Genset merk Cummins Stamford, 2
                                                                                  unit Sand Washing merk Golden Star,
     Risalah Lelang 1482/08.04/2024-02     19 Juli 2024            WWMLT2                                                              2.215.000.000       11.802.105.206             10.929.491.618          363.977.173      508.636.415
                                                                                  1 unit Truck Mixer merk HINO, 3 unit
                                                                                  Truck Mixer merk UD Truck, 1 unit
                                                                                  Wheel Loader merk Liugong

                                                                                  1 unit Excavator merk Komatsu, 6 unit
                                                                                  Genset merk Cummins Stamford, 1
                                                                                  unit Genset merk Perkins, 3 unit Sand
     Risalah Lelang 483/08.04/2024-02      19 Juli 2024            I1FE7X         Washing merk Golden Star, 1 unit                     2.000.000.000       11.042.791.625             10.430.970.917                  -        611.820.708
                                                                                  Truck Mixer merk Sany, 3 unit Truck
                                                                                  Mixer merk UD Truck, 1 unit Wheel
                                                                                  Loader merk Liugong




                                                                                                              - 99 -
Page 103
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                      (Expressed in Rupiah, unless otherwise stated)

           Nomor Risalah Lelang/         Tanggal Lelang/         Kode Lot Lelang/         Nama Barang yang dilelang/          Nilai Penawaran Tertinggi/   Harga Perolehan/      Akumulasi Penyusutan/        Nilai Penurunan/       Nilai Buku/
          Auction Minutes Number          Auction Date           Auction Lot Code        Name of item being auctioned             Highest Offer Value      Acquisition Value    Depreciation Accumulated         Impairment          Book Value
                                                                                      1 unit Sand Washing merk Golden
                                                                                      Star, 6 unit Truck Mixer merk Sany, 3
     Risalah Lelang 1555/10.01/2024-01     23 Juli 2024              MZVLOG           unit Truck Mixer merk UD Truck, 1                    1.559.704.899        6.940.694.169              6.813.112.188                     -         127.581.981
                                                                                      unit Wheel Loader merk SDLG, 1 unit
                                                                                      Wheel Loader merk Liugong
                                                                                      1 unit Genset merk Cummins
                                                                                      Stamford, 2 unit Truck Mixer merk
     Risalah Lelang 1556/10.01/2024-01     23 Juli 2024              WYITFM                                                                1.819.307.500        5.984.490.162              5.982.436.487                     -           2.053.675
                                                                                      Sany, 2 unit Truck Mixer merk HINO, 2
                                                                                      unit Truck Mixer merk UD Truck
                                                              Jumlah/Total                                                                11.544.012.399       59.352.692.930             57.024.653.751             502.857.150     1.825.182.029



   Berdasarkan Memo persetujuan Direksi dari WBP                                                                                   Based on the Approval Memo WBP Director’s
   No. 64/MP/WBP/DIR/2024 tanggal 31 Agustus 2024                                                                                  No. 64/MP/WBP/DIR/2024 dated August 31, 2024, it
   telah disetujui penghapusan aset tetap atas                                                                                     has been approved to write off fixed assets upon
   divestasi. Divestasi dilakukan melalui Kantor                                                                                   divestment. Divestment is carried out through the
   Pelayanan Kekayaan Negara dan Lelang Surakarta,                                                                                 Surakarta State Assets and Auction Services Office,
   dengan informasi lot lelang sebagai berikut:                                                                                    with auction lot information as follows:

           Nomor Risalah Lelang/            Tanggal Lelang/           Kode Lot Lelang/           Nama Barang yang dilelang/             Nilai Penawaran Tertinggi/     Harga Perolehan/         Akumulasi Penyusutan/              Nilai Buku/
          Auction Minutes Number             Auction Date             Auction Lot Code          Name of item being auctioned                Highest Offer Value        Acquisition Value       Depreciation Accumulated            Book Value
                                                                                             2 unit Dump Truck merk HINO, 1 unit
                                                                                             Truck Mixer merk HINO, 1 unit
              638/09.02/2024-01               30 Juli 2024                   7SOPUZ          Excavator merk Kobelco, 1 unit                           1.001.221.683            4.259.698.149               (4.210.604.955)           1.050.314.877
                                                                                             Genset merk Cummins - Stamford, 1
                                                                                             unit Wheel Loader merk Liugong
                                                             Jumlah/Total                                                                             1.001.221.683            4.259.698.149               (4.210.604.955)           1.050.314.877




   Aset tetap, berupa tanah, pabrik, kendaraan dan                                                                                 Fixed assets in the form of land, plants, vehicles and
   gedung dijadikan jaminan atas perolehan kredit                                                                                  buildings are used as collateral for Long-Term bank
   jangka panjang MRA dari bank. Sebagian tanah                                                                                    loans MRA. Some land and buildings above are
   berikut gedungnya dijadikan jaminan kepada                                                                                      used as collaterals to PT Bank Mandiri (Persero)
   PT Bank Mandiri (Persero) Tbk, PT Bank Negara                                                                                   Tbk, PT Bank Negara Indonesia (Persero) Tbk, and
   Indonesia (Persero) Tbk, dan PT Bank Rakyat                                                                                     PT Bank Rakyat Indonesia (Persero) Tbk amounting
   Indonesia (Persero) Tbk masing-masing sebesar                                                                                   to Rp143,700,000,000, Rp541,247,689,363, and
   Rp143.700.000.000,    Rp541.247.689.363,    dan                                                                                 Rp55,000,000,000, respectively, with a total amount
   Rp55.000.000.000, dengan nilai keseluruhan                                                                                      of Rp739,947,689,363 with the fair value of the land
   Rp739.947.689.363 dengan nilai wajar tanah dan                                                                                  and buildings as collateral amounting to
   gedung       yang       dijaminkan       sebesar                                                                                Rp637,925,732,000.
   Rp637.925.732.000.

   Gedung, pabrik dan peralatan dalam pembangunan                                                                                  The buildings, plants and equipment under
   pada     30      September      2024     sebesar                                                                                construction as of September 30, 2024 amounting
   Rp44.321.138.447 terutama terdiri dari bangunan                                                                                 to    Rp44,321,138,447   mainly   consisted   of
   dalam    penyelesaian     dari    WKI    sebesar                                                                                buildings in progress which belonging to WKI,
   Rp3.270.619.598, pabrik beton dalam penyelesaian                                                                                amounting to Rp3,270,619,598 precast plant in
   sebesar Rp31.103.048.795 dan peralatan dan                                                                                      progress amounting to Rp31,103,048,795 and
   renovasi    gedung       Perusahaan      sebesar                                                                                the Company’s equipment and building renovation
   Rp9.947.470.054.                                                                                                                amounting to Rp9,947,470,054.

   Berikut presentase dan estimasi penyelesaian aset                                                                               The following are the percentages and estimated
   dalam pembangunan pada tanggal 30 September                                                                                     date of completion of assets under construction as
   2024:                                                                                                                           of September 30, 2024:

                                                                        Proyek/                                                                                                         Penyelesaian/
                                                                        Project                                                                                                   Percentage of Completion

     Pembangunan/ Contruction of Plant Bojonegoro                                                                                                                                                 95,26%
     Pembangunan/ Contruction of Plant Plant Gasing                                                                                                                                               99,53%
     Pembangunan/ Contruction of Penajam Project                                                                                                                                                  75,73%
     Pembangunan/ Contruction of Plant Cikopo                                                                                                                                                     84,90%
     Proyek Pembangunan Dormitory Karawang                                                                                                                                                        91,92%



   Tidak ada kemajuan progres atas proyek di atas                                                                                  There is no progress on the projcets above since
   sejak tahun lalu.                                                                                                               prior year.

   Gedung, pabrik dan peralatan dalam pembangunan                                                                                  The buildings, plants and equipment under
   pada 31 Desember 2023 sebesar Rp85.649.300.527                                                                                  construction as of December 31, 2023 amounting to

                                                                                                                - 100 -
Page 104
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   terutama terdiri dari bangunan dalam penyelesaian                Rp85,649,300,527 mainly consisted of buildings in
   dari WKI, sebesar Rp3.270.619.598, pabrik beton                  progress which belonging to WKI, amounting to
   dalam penyelesaian sebesar Rp72.035.090.203 dan                  Rp3,270,619,598, precast plant in progress
   peralatan dan renovasi gedung Perusahaan sebesar                 amounting to Rp72,035,090,203 and the Company’s
   Rp10.343.590.726.                                                equipment and building renovation amounting to
                                                                    Rp10,343,590,726.

   Berdasarkan penilaian independen KJPP Agus, Ali,                 Based on the independent assessment of KJPP
   Firdaus dan Rekan yang ditandatangani oleh                       Agus, Ali, Firdaus dan Partners signed by
   M. Firdaus Asriadin, KJPP Sugeng, Irwan, Gunawan                 M. Firdaus Asriadin, KJPP Sugeng, Irwan, Gunawan
   dan Rekan yang ditandatangani oleh Muhlis                        dan Partners signed by Muhlis Indrawan, the fair
   Indrawan, nilai wajar tanah dan bangunan                         value of the Company's land and buildings as of
   Perusahaan per 31 Desember 2023 adalah sebesar                   December 31,2023 is Rp841,118,492,000, resulting
   Rp841.118.492.000, sehingga menghasilkan surplus                 in a revaluation surplus of Rp21,414,929,593 and
   revaluasi sebesar Rp21.414.929.593 dan dicatat                   recorded at Rp19,273,436,633 as a component of
   sebesar Rp19.273.436.633 sebagai komponen                        other equity after deducting tax. This assessment is
   ekuitas lainnya setelah dikurangi dengan pajak.                  based on a market approach and a cost approach.
   Penilaian ini berdasarkan pendekatan pasar dan
   pendekatan biaya.

   Revaluasi aset tetap dilakukan secara berkala setiap             Revaluation of fixed assets will be done periodically
   3 (tiga) tahun.                                                  every 3 (three) years.

   Penilaian atas nilai wajar aset tetap WKI berupa                 The valuation of fair value of the WKI fixed asset in
   tanah dan bangunan dilakukan oleh penilai                        the form of land and building was performed by
   independen, Kantor Jasa Penilai Publik Kantor Jasa               independent appraiser, Kantor Jasa Penilai Publik
   Penilai Publik Muttaqin, Bambang, Purwanto,                      Muttaqin, Bambang, Purwanto, Rozak, Uswatun,
   Rozak, Uswatun, dan Rekan dengan laporan                         dan Rekan with report No. 00337/2.0027-
   No. 00337/2.0027-00/PI/11/0196/1/III/2024 tanggal                00/PI/11/0196/1/III/2024 dated March 15, 2023.
   15 Maret 2023.

   Penilaian atas nilai wajar aset tetap WSE berupa                 The valuation of fair value of the WSE’s fixed asset
   tanah dan bangunan dilakukan oleh penilai                        in the form of land and building was performed by
   independen, Ir. Sukardi, MAPPI (Cert.), Kantor Jasa              independent appraiser, Ir. Sukardi, MAPPI (Cert.),
   Penilai Publik Sukandi, Israr, dan Rekan, dengan                 Kantor Jasa Penilai Publik Sukandi, Israr, dan
   laporan No. 00013/2.0011-00/PI/02/0043/1/XI/2023                 Rekan, with report No. 00013/2.001100/PI/02/
   tanggal 8 November 2023.                                         0043/1/XI/2023 dated November 8, 2023.

   Penilaian ini dilakukan berdasarkan pendekatan                   This assessment is based on the market approach,
   pasar, pendapatan dan biaya.                                     revenue and cost.

   Berdasarkan Memo Persetujuan dari Direksi                        Based on Memo approval from the Board of
   PT     Waskita  Beton    Precast     Tbk.   Nomor                Directors PT Waskita Beton Precast Tbk. Number
   24.2/MP/WBP/DIR.2024 tanggal 4 Maret 2024 telah                  24.2/MP/WBP/DIR.2024 dated March 4 2024, it was
   disetujui penghapusan aset tetap atas divestasi,                 approved to write off fixed assets upon divestment,
   dengan harga perolehan / acquisition value sebesar               with an acquisition value of Rp66,115,879,136.
   Rp66.115.879.136. Divestasi dilakukan melalui                    Divestment was carried out through the Purwakarta
   Kantor Pelayanan Kekayaan Negara dan Lelang                      State Wealth Services and Auction Office.
   Purwakarta.
   WBP telah memperoleh beberapa hak atas tanah                     WBP has obtained land rights title or building use
   atau Hak Guna Bangunan (HGB) seluas 24 hektar di                 rights covering an area of 24 hectares in
   Bojonegara, Cibitung, Kalijati, Sadang dan Subang                Bojonegara, Cibitung, Kalijati, Sadang and Subang
   selama 35 tahun hingga 2046 dari Badan                           for 35 years until 2046 from the National Land
   Pertanahan Nasional, yang terdiri dari seluas 6,16               Affairs Agency (Badan Pertanahan Nasional), which
   hektar di Bojonegara; 1,66 hektar di Cibitung; 1,19              consist of over 6.16 hectares in Bojonegara; 1.66
   hektar di Kalijati; 7,01 hektar di Sadang; dan 15,09             hectares in Cibitung; 1.19 hectares in Kalijati; 7.01
   hektar di Subang.                                                hectares in Sadang; and 15.09 hectares in Subang.

   Berdasarkan hasil penilaian Kantor Jasa Penilai                  Based on the results of the assessment by
   Publik (KJPP) Firdaus, Ali dan Rekan dengan nomor                the Public Appraisal Services Office (KJPP) Firdaus,
   laporan     00109/2.0134-00/PI/03/0071/1/VII/2024,               Ali and Partners with report number 00109/2.0134-
   tanggal 1 Juli 2024 perihal penilaian aset Plant                 00/PI/03/0071/1/VII/2024,    dated     July  1,2024
                                                          - 101 -
Page 105
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                                    (Expressed in Rupiah, unless otherwise stated)

   Bojonegara, dengan hasil nilai wajar tanah dan                                                                                               regarding the valuation of Plant Bojonegara assets,
   bangunan Plant Bojonegara masing-masing adalah                                                                                               with the results of the fair value of the land and Plant
   sebesar Rp172.633.000.000 dan Rp68.310.000.000,                                                                                              Bojonegara          buildings        amounted         to
   sehingga terdapat defisit revaluasi tanah dan                                                                                                Rp172,633,000,000           and       Rp68,310,000,000
   bangunan      Plant     Bojonegara      sebesar                                                                                              respectively, so there was a deficit in the revaluation
   Rp431.818.351.217.                                                                                                                           of the land and buildings of Plant Bojonegara
                                                                                                                                                amounting to Rp431,818,351,217.
   Pada 30 Juni 2024 sudah dilakukan pemulihan atas                                                                                             As of June 30, 2024 recovery has been carried out
   penurunan nilai aset tanah dan bangunan plant                                                                                                for the decrease in the value of the land and building
   Bojonegara, dan dilakukan penghapusbukuan                                                                                                    assets, and written off based on the results of the
   berdasarkan hasil penilaian oleh Kantor Jasa Penilai                                                                                         assessment by the Public Appraisal Services Office.
   Publik (KJPP), dan telah disetujui pada hasil                                                                                                and has been approved in the results of the Second
   keputusan Rapat Umum Pemegang Saham                                                                                                          Annual General Meeting of Shareholders of PT
   Tahunan Kedua PT Waskita Beton Precast, Tbk                                                                                                  Waskita Beton Precast, Tbk based on deed No. 24
   berdasarkan akta No. 24 tanggal 11 Juli 2024 oleh                                                                                            dated July 11, 2024 by notary Ashoya Ratam, S.H.,
   notaris Ashoya Ratam, S.H., MKN. dan telah                                                                                                   MKN. and has been approved by the Minister of Law
   disahkan oleh Menteri Hukum dan Hak Asasi                                                                                                    and Human Rights of the Republic of Indonesia in
   Manusia    Republik     Indonesia    dalam    Surat                                                                                          his Decree No. AHU-0142919.AH.01.11.TAHUN
   Keputusannya No. AHU-0142919.AH.01.11.TAHUN                                                                                                  2024 dated July 15, 2024.
   2024 tanggal 15 Juli 2024.
   Beban penyusutan dialokasikan sebagai berikut:                                                                                               Depreciation expenses are allocated as follows:

                                                                                                              30 September/ September 30,
                                                                                                               2024                2023
                                                                                                                Rp                  Rp

     Beban Pokok Pendapatan                                                                                  159.434.668.985                     231.823.068.550                                                                 Cost of Revenues
     Beban Umum dan Administrasi                                                                             157.002.136.093                     177.213.473.843                                               General and Administrative Expenses
     Jumlah                                                                                                  316.436.805.078                     409.036.542.393                                                                                                  Total


   Pada tanggal 30 September 2024, gedung, pabrik,                                                                                              As at September 30, 2024, buildings, plants, project
   peralatan proyek dan kendaraan untuk seluruh unit                                                                                            equipments and vehicles for all business units and
   bisnis serta kantor pusat telah diasuransikan dengan                                                                                         head office were insured as follows:
   nilai pertanggungan dan risiko sebagai berikut:
                 Nama Asuradur/                                             Jenis Aset/                                                             Periode Asuransi/                                          Nilai Pertanggungan/               Perusahaan/
                    Insurer                                               Type of Assets                                                            Insurance Period                                            The Sum Insured                    Company
                                                                                                                                                                                                                         Rp
     PT Asuransi Jasa Tania Tbk               Asuransi Risiko Properti/ Property All Risk Insurance                 1 Februari/ February 1, 2024      s.d/ to           1 Februari/ February 1, 2025                  220.026.000.000   PT Waskita Beton Precast Tbk
     PT Asuransi Jasa Tania Tbk               Asuransi Gempa Bumi/ Earthquake Insurance                             1 Februari/ February 1, 2024      s.d/ to           1 Februari/ February 1, 2025                 220.026.000.000    PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance                   4 Maret/ March 4, 2024          s.d/ to             4 Maret/ March 4, 2025                     173.860.000.000    PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                               4 Maret/ March 4, 2024          s.d/ to             4 Maret/ March 4, 2025                     173.860.000.000    PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance                 18 Januari/ January 18, 2024      s.d/ to           18 Januari/ January 18, 2025                  96.379.000.000    PT Waskita Beton Precast Tbk
     PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                             18 Januari/ January 18, 2024      s.d/ to           18 Januari/ January 18, 2025                  96.379.000.000    PT Waskita Beton Precast Tbk
     PT BRI Asuransi Indonesia                Asuransi Risiko Properti/ Property All Risk Insurance                 18 Januari/ January 18, 2024      s.d/ to           18 Januari/ January 18, 2025                  86.743.000.000    PT Waskita Beton Precast Tbk
     PT BRI Asuransi Indonesia                Asuransi Gempa Bumi/ Earthquake Insurance                             18 Januari/ January 18, 2024      s.d/ to           18 Januari/ January 18, 2025                  86.743.000.000    PT Waskita Beton Precast Tbk
     PT Asuransi Tri Pakarta                  Asuransi Risiko Properti/ Property All Risk Insurance                  1 Agustus/ August 1, 2024         s.d/ to           1 Agustus/ August 1, 2025                    67.429.710.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance                              1 Agustus/ August 1, 2024         s.d/ to           1 Agustus/ August 1, 2025                    67.429.710.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Property All Risk / Property All Risk Insurance               1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                     2.022.226.500    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance                              1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                     2.022.226.500    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Industrial All Risk / Industrial All Risk Insurance           1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                     1.221.150.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance                              1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                     1.221.150.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Motor Vehicle/ Motor Vehicle Insurance                        1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                       346.000.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Property All Risk / Property All Risk Insurance               1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                     1.964.665.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance                              1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                     1.964.665.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Property All Risk / Property All Risk Insurance               1 Agustus/ August 1, 2024        s.d/ to            1 Agustus/ August 1, 2025                     2.937.360.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance                               1 Agustus/ August 1, 2024       s.d/ to          1 Agustus/ August 1, 2025                       2.937.360.000    PT Waskita Karya (Persero) Tbk
     PT Asuransi Central Asia (ACA)           Asuransi Industrial All Risk / Industrial All Risk Insurance        12 November/ November 12, 2023      s.d/ to      12 November/ November 12, 2024                    132.869.900.000    PT Waskita Karya Infrastruktur
     PT Avrist Assurance                      Asuransi Risiko Properti/ Property All Risk Insurance                    26 Juni/ June 26, 2024         s.d/ to              26 Juni/ June 26, 2025                    134.686.499.024    PT Waskita Karya Realty
     PT Avrist Assurance                      Asuransi Gempa Bumi/ Earthquake Insurance                                26 Juni/ June 26, 2024         s.d/ to              26 Juni/ June 26, 2025                    134.686.499.024    PT Waskita Karya Realty
     PT Avrist Assurance                      Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance                  26 Juni/ June 26, 2024         s.d/ to              26 Juni/ June 26, 2025                     20.000.000.000    PT Waskita Karya Realty
     PT Avrist Assurance                      Polis Liabilitas Publik/ Public Liability Policy                         26 Juni/ June 26, 2024         s.d/ to              26 Juni/ June 26, 2025                      5.000.000.000    PT Waskita Karya Realty
                                                                                                                                                                                               Jumlah/ Total       1.732.755.121.048




                                                                                                                         - 102 -
Page 106
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                             (Expressed in Rupiah, unless otherwise stated)


      Pada tanggal 31 Desember 2023, gedung, pabrik,                                                                                      As of December 31, 2023, buildings, plants, project
      peralatan proyek dan kendaraan untuk seluruh unit                                                                                   equipments and vehicles for all business units and
      bisnis serta kantor pusat telah diasuransikan                                                                                       head office were insured as follows:
      dengan nilai pertanggungan dan risiko sebagai
      berikut:

                  Nama Asuradur/                                              Jenis Aset/                                                    Periode Asuransi/                                         Nilai Pertanggungan/              Perusahaan/
                     Insurer                                                Type of Assets                                                   Insurance Period                                           The Sum Insured                   Company
                                                                                                                                                                                                                 Rp

      PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance       1 Februari/ February 1, 2023        s.d/ to 1 Februari/ February 1, 2024                         220.026.000.000    PT Waskita Beton Precast Tbk
      PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                   1 Februari/ February 1, 2023        s.d/ to 1 Februari/ February 1, 2024                         220.026.000.000    PT Waskita Beton Precast Tbk
      PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance       4 Maret/ March 4, 2023              s.d/ to 4 Maret/ March 4, 2024                               173.860.000.000    PT Waskita Beton Precast Tbk
      PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                   4 Maret/ March 4, 2023              s.d/ to 4 Maret/ March 4, 2024                               173.860.000.000    PT Waskita Beton Precast Tbk
      PT Asuransi Kredit Indonesia (Persero)   Asuransi Risiko Properti/ Property All Risk Insurance       18 Januari/ January 18, 2024        s.d/ to 18 Januari/ January 18, 2025                          96.379.000.000    PT Waskita Beton Precast Tbk
      PT Asuransi Kredit Indonesia (Persero)   Asuransi Gempa Bumi/ Earthquake Insurance                   18 Januari/ January 18, 2024        s.d/ to 18 Januari/ January 18, 2025                          96.379.000.000    PT Waskita Beton Precast Tbk
      PT BRI Asuransi Indonesia                Asuransi Risiko Properti/ Property All Risk Insurance       18 Januari/ January 18, 2024        s.d/ to 18 Januari/ January 18, 2025                          86.743.000.000    PT Waskita Beton Precast Tbk
      PT BRI Asuransi Indonesia                Asuransi Gempa Bumi/ Earthquake Insurance                   18 Januari/ January 18, 2024        s.d/ to 18 Januari/ January 18, 2025                          86.743.000.000    PT Waskita Beton Precast Tbk
      PT Asuransi Tri Pakarta                  Asuransi Risiko Properti/ Property All Risk Insurance       1 Agustus/ August 1, 2023           s.d/ to 1 Agustus/ August 1, 2024                             67.429.710.000    PT Waskita Karya (Persero) Tbk
      PT Asuransi Tri Pakarta                  Asuransi Gempa Bumi/ Earthquake Insurance                   1 Agustus/ August 1, 2023           s.d/ to 1 Agustus/ August 1, 2024                             67.429.710.000    PT Waskita Karya (Persero) Tbk
      PT Asuransi Jasindo (Persero)            Asuransi Gempa Bumi/ Earthquake Insurance                   1 Agustus/ August 1, 2023           s.d/ to 1 Agustus/ August 1, 2024                               2.452.470.000   PT Waskita Karya (Persero) Tbk
      PT Asuransi Jasindo (Persero)            Asuransi Kebakaran/ Fire Insurance                          1 Agustus/ August 1, 2023           s.d/ to 1 Agustus/ August 1, 2024                               2.452.470.000   PT Waskita Karya (Persero) Tbk
      PT Asuransi Aspan                        Asuransi Risiko Properti/ Property All Risk Insurance       25 Mei/ May 25, 2023                s.d/ to 25 Mei/ May 25, 2024                                    2.022.226.500   PT Waskita Karya (Persero) Tbk
      PT Asuransi Jasindo (Persero)            Asuransi Kebakaran/ Fire Insurance                          12 Maret/ March 12, 2023            s.d/ to 12 Maret/ March 12, 2024                                1.269.270.000   PT Waskita Karya (Persero) Tbk
      PT Asuransi Jasindo (Persero)            Asuransi Gempa Bumi/ Earthquake Insurance                   12 Maret/ March 12, 2023            s.d/ to 12 Maret/ March 12, 2024                               1.269.270.000    PT Waskita Karya (Persero) Tbk
      PT Asuransi Central Asia (ACA)           Asuransi Industrial All Risk                                12 November/ November 12, 2023      s.d/ to 12 November/ November 12, 2024                       132.869.900.000    PT Waskita Karya Infrastruktur
      PT Sunday Insurance Indonesia            Asuransi Risiko Properti/ Property All Risk Insurance       26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                               123.683.628.714    PT Waskita Karya Realty
      PT Sunday Insurance Indonesia            Asuransi Gempa Bumi/ Earthquake Insurance                   26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                               123.683.628.714    PT Waskita Karya Realty
      PT Sunday Insurance Indonesia            Asuransi Kerusakan Mesin/ Machinery Breakdown Insurance     26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                                20.000.000.000    PT Waskita Karya Realty
      PT Sunday Insurance Indonesia            Polis Liabilitas Publik/ Public Liability Policy            26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                                  5.000.000.000   PT Waskita Karya Realty
      PT Sunday Insurance Indonesia            Business Interruption Insurance (PAR)                       26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                                25.000.000.000    PT Waskita Karya Realty
      PT Sunday Insurance Indonesia            Business Interruption Insurance (MB)                        26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                                20.000.000.000    PT Waskita Karya Realty
      PT Sunday Insurance Indonesia            Business Interruption Insurance (EQVET)                     26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                                25.000.000.000    PT Waskita Karya Realty
      PT Sunday Insurance Indonesia            Personal Accident                                           26 Juni/ June 26, 2023              s.d/ to 26 Juni/ June 26, 2024                                     5.056.000    PT Waskita Karya Realty
                                                                                                                                                                                       Jumlah/ Total       1.773.583.339.928




      Manajemen        berpendapat     bahwa      nilai                                                                                   The management believes that insurance coverage
      pertanggungan atas aset tetap yang diasuransikan                                                                                    for fixed assets which have been insured are
      adalah cukup untuk menutup kemungkinan                                                                                              adequate to cover the possible losses.
      kerugian yang terjadi.

19.              ASET HAK GUNA - BERSIH                                                                                                   19. RIGHT-OF-USE ASSETS - NET

      Dibawah ini adalah jumlah yang tercatat aset hak                                                                                    Below are the carrying amount of right-of-use assets
      guna yang diakui dan mutasinya selama periode                                                                                       recognized and the movements during the period:
      berjalan:

                                                                                1 Januari/               Penambahan/                      Pengurangan/                    30 September/
                                                                              Januari 1, 2024             Additions                        Deductions                   September 30, 2024
                                                                                   Rp                        Rp                               Rp                               Rp
         Aset Guna Usaha                                                                                                                                                                                                                       Leased Assets
          Tanah                                                                      36.604.513.052           2.353.567.625                                --                       38.958.080.677                                                     Land
          Bangunan                                                                    4.889.348.814                       --                     630.497.156                         4.258.851.658                                                  Building
          Kendaraan                                                                 139.853.321.842                       --                   9.626.190.610                       130.227.131.232                                                  Vehicles
          Peralatan                                                                   4.443.979.566                       --                               --                        4.443.979.566                                                Equipment
         Jumlah Harga Perolehan                                                     185.791.163.274           2.353.567.625                   10.256.687.766                       177.888.043.133                                   Total Acquisition Cost

         Akumulasi Depresiasi                                                                                                                                                                                                    Accumulated Depreciation
          Tanah                                                                      31.490.629.392             490.200.647                      584.086.484                        31.396.743.555                                                 Land
          Bangunan                                                                    3.931.156.971             616.505.802                      625.000.003                         3.922.662.770                                              Building
          Kendaraan                                                                 119.505.919.811           9.208.644.492                      549.643.928                       128.164.920.375                                              Vehicles
          Peralatan                                                                   4.443.979.567                       --                               --                        4.443.979.567                                            Equipment
         Total                                                                      159.371.685.741         10.315.350.941                     1.758.730.415                       167.928.306.267                                                              Total
         Jumlah Aset Guna Usaha                                                       26.419.477.533                                                                                  9.959.736.866                                    Total Leased Assets




                                                                                                                        - 103 -
Page 107
PT WASKITA KARYA (PERSERO) Tbk                                                                             PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                 FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                           FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                 ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                         AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                  (Expressed in Rupiah, unless otherwise stated)

                                            1 Januari/                Penambahan/              Pengurangan/               31 Desember/
                                          Januari 1, 2023              Additions                Deductions              December 31, 2023
                                               Rp                         Rp                       Rp                          Rp
     Aset Guna Usaha                                                                                                                                                       Leased Assets
      Tanah                                    36.849.513.052                         --               245.000.000             36.604.513.052                                      Land
      Bangunan                                  9.907.863.466               275.366.419              5.293.881.071              4.889.348.814                                   Building
      Kendaraan                               137.053.091.510            13.260.197.114             10.459.966.782            139.853.321.842                                   Vehicles
      Peralatan                                 5.929.211.568                         --             1.485.232.002              4.443.979.566                                 Equipment
     Jumlah Harga Perolehan                   189.739.679.596            13.535.563.533             17.484.079.855            185.791.163.274                       Total Acquisition Cost

     Akumulasi Depresiasi                                                                                                                                         Accumulated Depreciation
      Tanah                                    24.841.616.308              6.746.972.266                97.959.182             31.490.629.392                                       Land
      Bangunan                                  8.725.623.081                499.414.961             5.293.881.071              3.931.156.971                                    Building
      Kendaraan                               111.713.959.790            18.103.519.867             10.311.559.846            119.505.919.811                                    Vehicles
      Peralatan                                 4.827.819.060                          --              383.839.493              4.443.979.567                                  Equipment
     Total                                    150.109.018.239            25.349.907.094             16.087.239.592            159.371.685.741                                         Total
     Jumlah Aset Guna Usaha                    39.630.661.357                                                                  26.419.477.533                         Total Leased Assets




   Grup menyewa beberapa aset termasuk tanah,                                                  The Group leases several assets including land,
   bangunan, kendaraan dan peralatan. Rata - rata                                              buildings, vehicles and equipment. The average
   masa sewa adalah 2,5 tahun.                                                                 lease term is 2.5 years.

   Beban amortisasi aset hak guna usaha dicatat                                                Amortization expense of right of use assets
   sebagai beban umum dan administrasi.                                                        recorded in general and administrative expense.

   Berikut adalah jumlah laba rugi yang diakui dalam                                           The following are the amounts recognized in profit or
   laba rugi:                                                                                  loss:
                                                                       30 September/ September 30,
                                                                        2024                2023
                                                                         Rp                  Rp
      Beban penyusutan aset hak guna                                    3.067.930.745              6.337.115.392                          Depreciation expense of right-of-use assets
      Beban bunga liabilitas sewa                                         122.434.950                736.609.981                                 Interest expense on lease liabilities

     Jumlah yang diakui dalam laba rugi                                 3.190.365.695              7.073.725.373                           Total amount recognized in profit or loss



   Pada tanggal 30 September 2024 dan 2023 total                                               On September 30, 2024 and 2023, the total cash
   pengeluaran kas untuk sewa adalah sebesar                                                   disbursements    for  leases  amounting     to
   Rp19.431.509.635 dan Rp19.602.550.331.                                                      Rp19,431,509,635     and     Rp19,602,550,331
                                                                                               respectively.

20. GOODWILL                                                                            20. GOODWILL
                                                                                       2024
                                                  1 Januari/            Penambahan/           Pengurangan/           30 September/
                                                  January 1,             Additions             Deduction             September 30,
                                                      Rp                    Rp                    Rp                      Rp

     Biaya Perolehan                              4.025.903.165.936                    --     (684.194.424.739)       3.341.708.741.197                                  Acquisition Cost
     Nilai Buku                                   4.025.903.165.936                    --     (684.194.424.739)       3.341.708.741.197                                  Net Book Value



                                                                                       2023
                                                  1 Januari/            Penambahan/           Pengurangan/           31 Desember/
                                                  January 1,             Additions             Deduction             December 31,
                                                      Rp                    Rp                    Rp                      Rp

     Biaya Perolehan                              4.025.903.165.936                    --                    --       4.025.903.165.936                                  Acquisition Cost
     Nilai Buku                                   4.025.903.165.936                    --                    --       4.025.903.165.936                                  Net Book Value




                                                                                 - 104 -
Page 108
PT WASKITA KARYA (PERSERO) Tbk                                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                          (Expressed in Rupiah, unless otherwise stated)

   Rincian nilai tercatat goodwill adalah sebagai                                       The details of goodwill are as follows:
   berikut:
                                                                                                                         Nilai Neto/ Net Value
      Entitas Pengakuisisi/                      Perolehan Saham pada/                Tahun Perolehan/          30 September/                    31 Desember/
        Acquirer Entity                           Share Acquisition in               Year of Acquisition      September 30, 2024               December 31, 2023
                                                                                                                     Rp                               Rp
     PT Waskita Toll Road     PT Waskita Transjawa Toll Road (WTTR)                         2022                        3.099.202.962.876        3.099.202.962.876
     PT Waskita Toll Road     PT Pemalang Batang Toll Road (PBTR)                           2016                          183.723.536.629          183.723.536.629
     PT Waskita Toll Road     PT Waskita Sriwijaya Tol (WST)                                2016                           58.782.241.692           58.782.241.692
     PT Waskita Toll Road     PT Trans Jabar Tol (TJT)                                      2015                                        --         684.194.424.739
     Jumlah/ Total                                                                                                      3.341.708.741.197        4.025.903.165.936


   Akuisisi WTTR                                                                        WTTR Acquisition

   Pada tanggal 31 Desember 2021, WTR memiliki                                          As at December 31, 2021 WTR has a 35.5%
   kepemilikan sebesar 35,5% di WTTR dan mencatat                                       interest in WTTR and recorded the investment as
   investasi tersebut sebagai investasi asosiasi.                                       an investment in associates.

   Berdasarkan Berita Acara RUPUP Reksa Dana                                            Based on the Minutes of RUPUP Equity Limited
   Penyertaan       Terbatas     Ekuitas     Danareksa                                  Participation Mutual Fund Danareksa Trans Java
   Infrastruktur Trans Jawa (“RDPT EDITJ”) No. 89                                       Infrastructure (“RDPT EDITJ”) No. 89 dated
   tanggal 27 Juli 2022 oleh Notaris Ir Nanette                                         July 27, 2022 by Notary Ir Nanette Cahyanie
   Cahyanie Handari Adi Warsito, WTR melakukan                                          Handari Adi Warsito, WTR will pay off in stages
   pelunasan     secara    bertahap     terhadap    unit                                the participation units of RDPT unit holders of
   penyertaan para pemegang unit RDPT sekitar 80%                                       around 80% of the total units owned by RDPT
   dari total unit yang dimiliki investor RDPT yaitu                                    investors,      which    is    Rp5,256,112,000,000.
   sebesar      Rp5.256.112.000.000.        Pelaksanaan                                 The gradual redemption will be carried out no later
   pelunasan bertahap tersebut dilakukan paling                                         than August 2022. WTR will buy the remaining units
   lambat Agustus 2022. WTR akan membeli sisa unit                                      if it has available funds with an estimated value of
   penyertaan apabila sudah memiliki ketersediaan                                       Rp1,300,000,000,000.
   dana       dengan      estimasi     nilai    sebesar
   Rp1.300.000.000.000.

   Berdasarkan akta No.60 tanggal 26 Agustus 2022                                       Based on deed No. 60 dated 26 August 2022 made
   yang dibuat dihadapan Ir. Nanette Cahyanie Handari                                   before Ir. Nanette Cahyanie Handari Adi Warsito,
   Adi Warsito, bahwa para pemegang saham                                               whereas the shareholders agreed to WTR's action
   menyetujui tindakan WTR melakukan Call Option                                        to make a Call Option for RDPT shares in WTTR
   saham RDPT di WTTR melalui pembelian unit                                            through the purchase of a participation unit
   penyertaan (Subscription) dengan harga sebesar                                       (Subscription) at a price of Rp6,546,570,473,856.
   Rp6.546.570.473.856.

   Berdasarkan   surat    konfirmasi  pembelian                                         Based    on     purchase     confirmation letter
   No.CPD1906FXQ37565 tanggal 30 Agustus 2022,                                          No.CPD1906FXQ37565 dated August 30, 2022,
   WTR telah melakukan pembelian 80% penyertaan                                         WTR has purchased 80% investment in RDPT in
   RDPT sebesar Rp5.256.112.000.000.                                                    the amount of Rp5,256,112,000,000.

   Nilai wajar aset yang diperoleh dan kewajiban yang                                   The fair value of the assets acquired and liabilities
   dialihkan pada tanggal akuisisi adalah sebagai                                       assumed at the acquisition date were as follows:
   berikut:
   Kas dan Setara Kas                                                        592.155.597.432                                   Cash and Cash Equivalents
   Kas yang Dibatasi Penggunaannya                                             37.152.657.435                                              Restricted Cash
   Piutang lain-lain                                                       3.933.193.897.861                                            Other Receivables
   Uang Muka dan Biaya Dibayar di Muka                                       159.705.967.881                              Advances and Prepaid Expense
   Pajak Dibayar Dimuka                                                         1.291.833.496                                                  Prepaid Tax
   Aset Tetap                                                                     711.370.880                                                   Fixed Asset
   Aset Takberwujud - Hak Pengusahaan Jalan Tol                            4.758.609.943.178               Intangible Assets - Toll Road Concession Right
   Aset Hak Guna                                                                2.112.797.313                                           Right of Use Asset
   Aset Pajak Tangguhan                                                            19.114.431                                           Deferred Tax Asset
   Utang Usaha                                                             (228.094.511.490)                                                Trade Payable
   Biaya yang Masih Harus Dibayar                                             (2.289.316.663)                                            Accrual Expenses
   Utang Pajak                                                             (574.687.217.350)                                                   Tax Payable
   Utang Bank                                                            (2.728.861.984.472)                                                     Bank Loan
   Provisi pelapisan jalan tol                                               (66.277.758.922)                                          Provision for overlay
   Liabilitas Sewa                                                            (2.377.739.580)                                              Lease Liabilities
   Liabilitas Lain-lain                                                    (462.281.294.927)                                                Other Liabilities
   Nilai Wajar Aset Bersih Teridentifikasi                                                                                       Fair Value of Identifiable
    yang Diperoleh                                                        5.420.083.356.506                                           Net Asset Acquired



                                                                           - 105 -
Page 109
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

   Goodwill dan arus kas keluar bersih yang timbul dari                Goodwill and net cash outflow arising from such
   akuisisi adalah sebagai berikut:                                    acquisition are as follows:
   Imbalan kas yang dialihkan                               5.256.112.000.000                          Cash consideration transferred
   Kepentingan non-pengendali                                 646.073.936.094                                 Non-controlling interest
   Investasi Asosiasi                                       2.617.100.383.287                                Investment in associate
   Sub jumlah                                               8.519.286.319.381                                                 Subtotal
   Nilai Wajar Aset Bersih teridentifikasi                                                                    Fair Value of identifiable
    yang diperoleh                                      (5.420.083.356.506)                                        net asset acquired
   Goodwill yang timbul dari akuisisi                       3.099.202.962.875                      Goodwill arising from acquisition


   Akuisisi PBTR                                                       PBTR Acquisition

   Nilai wajar aset yang diperoleh dan kewajiban yang                  The fair values of the assets acquired and liabilities
   dialihkan pada tanggal akuisisi adalah sebagai                      assumed at the acquisition date were as follows:
   berikut:

   Kas dan Setara Kas                                           1.283.729.504                              Cash and Cash Equivalents
   Pajak Dibayar di Muka                                          576.893.132                                                Prepaid Tax
   Aset Takberwujud - Hak Pengusahaan Jalan Tol              109.002.363.811           Intangible Assets - Toll Road Concession Right
   Utang Pajak                                                    (39.261.438)                                             Tax Payables
   Beban Akrual                                                 (816.220.871)                                       Accrued Expenses
   Liabilitas Lain-lain Jangka Pendek                             (43.804.858)                                Other Liabilities - Current
   Liabilitas Lain-lain Jangka Panjang                       (49.502.926.995)                            Other Liabilities - Non Current
   Nilai Wajar Aset Bersih Teridentifikasi                                                                   Fair Value of Identifiable
    yang Diperoleh                                             60.460.772.285                                    Net Asset Acquired
   Nilai Wajar Aset Kepentingan Nonpengendali                (24.184.308.914)                     Fair value of Non-Controlling Interest
   Goodwill                                                  183.723.536.629                                                   Goodwill
   Nilai Wajar Imbalan yang Dialihkan                         220.000.000.000               Fair Value of Consideration Transferred


   Pada tanggal 15 Februari 2016, WTR dan                              On February 15, 2016, WTR and PT Langkah
   PT    Langkah   Utama      Perkasa,  Countryside                    Utama      Perkasa,   Countryside     Investment
   Investment Corporation dan PT Sumber Mitra Jaya                     Corporation and PT Sumber Mitra Jaya entered into
   menandatangani     perjanjian   pembelian   60%                     an agreement to purchase 60% ownership in
   kepemilikan PT PBTR dengan harga perolehan                          PT PBTR amounted to Rp220,000,000,000.
   sebesar Rp220.000.000.000.

   Akuisisi WST                                                        WST Acquisition
   Nilai wajar aset yang diperoleh dan kewajiban yang                  The fair values of the assets acquired and liabilities
   dialihkan pada tanggal akuisisi adalah sebagai                      assumed at the acquisition date were as follows:
   berikut:

   Kas dan Setara Kas                                        303.517.604.893                               Cash and Cash Equivalents
   Aset Pajak Tangguhan                                         1.232.557.000                                     Deferred Tax Assets
   Proyek Dalam Pelaksanaan                                  135.758.968.659                                      Project on Progress
   Aset Tetap                                                      36.876.125                                            Fixed Assets
   Utang Pajak                                                (6.050.791.698)                                           Tax Payables
   Utang Pihak Berelasi                                       (3.471.807.800)                                 Related Parties Payable
   Liabilitas Imbalan Kerja                                   (3.993.810.000)                                Post-Employment Benefit
   Nilai Wajar Aset Bersih Teridentifikasi                                                                   Fair Value of Identifiable
    yang Diperoleh                                           427.029.597.179                                     Net Asset Acquired
   Nilai Wajar Aset Kepentingan Nonpengendali               (170.811.838.872)                    Fair value of Non-Controlling Interest
   Goodwill                                                    58.782.241.693                                                 Goodwill
   Nilai Wajar Imbalan yang Dialihkan                        315.000.000.000                Fair Value of Consideration Transferred


   Pada tanggal 19 Mei 2016, WTR dan                                   On May 19, 2016, WTR and PT Persada Tanjung
   PT Persada Tanjung Api - api menandatangani                         Api - api entered into an agreement to purchase
   perjanjian pembelian 60% kepemilikan PT WST                         60% ownership interest in PT WST amounting to
   dengan       harga      perolehan     sebesar                       Rp315,000,000,000.
   Rp315.000.000.000.

   Manajemen berkeyakinan bahwa tidak terdapat                         Management believes that there is no indication of
   indikasi penurunan nilai atas saldo goodwill tersebut.              impairment of the goodwill balance.


                                                             - 106 -
Page 110
PT WASKITA KARYA (PERSERO) Tbk                                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                    (Expressed in Rupiah, unless otherwise stated)

21. ASET LAIN-LAIN                                                          21. OTHER ASSETS
                                                            30 September/           31 Desember/
                                                          September 30, 2024      December 31, 2023
                                                                 Rp                      Rp
   Uang Jaminan                                                 778.383.697.705        916.886.892.733                                       Warranty
   Beban Kontrak Ditangguhkan                                   185.888.222.845         50.279.864.704                    Contract Deferred Charges
   Aset Lain-lain - Bagi Hasil                                  204.644.521.161        210.491.507.475                   Other Assets - Profit Sharing
   Kas yang Dibatasi Penggunaannya - Jangka Panjang             105.496.902.211         88.074.293.185                 Restricted Cash - Long - Term
   Tanah dan Bangunan                                            73.842.098.327         73.842.098.327                            Land and Buildings
   Perangkat Lunak - Bersih                                      19.355.000.105         42.273.656.352                                  Software - net
   Aset Tidak Lancar Lainnya                                    781.512.004.363        781.512.004.363                      Other Non-current Assets
   Dikurangi: Penyisihan Kerugian Penurunan Nilai             (330.491.418.860)      (330.491.418.860)        Less: Allowance for Impairment Losses
   Jumlah                                                     1.818.631.027.857      1.832.868.898.279                                          Total


   Uang Jaminan merupakan uang yang dipakai untuk                                 Warranty is account used to issue a letter of
   mengeluarkan surat jaminan/ bank garansi yang                                  guarantee/ bank guarantee which can be given to
   dapat diberikan kepada Pengguna Jasa dalam                                     Service Users in the context of implementing
   rangka pelaksanaan proyek-proyek di dalam negeri,                              projects in the country, such as a Letter of
   seperti Surat Jaminan/ Bank Garansi Tender, Surat                              Guarantee/ Tender Bank Guarantee, Letter of
   Jaminan/ Bank Surat Jaminan/ Bank Garansi Uang                                 Guarantee/ Bank Guarantee Letter/ Bank Guarantee
   Muka, Surat Jaminan/ Bank Garansi Pelaksanaan,                                 for   Advance    Payment,   Letter    Guarantee/
   Surat Jaminan/Bank Garansi Retensi, Surat                                      Implementation Bank Guarantee, Letter of
   Jaminan/ Bank Garansi QHSE/ ESHS.                                              Guarantee/ Retention Bank Guarantee, Letter of
                                                                                  Guarantee/ QHSE/ ESHS Bank Guarantee.
   Beban kontrak yang ditangguhkan merupakan                                      Contract deferred charges represent deferred
   beban yang ditangguhkan atas proyek-proyek yang                                expense of the projects’ preparation, which will be
   dalam persiapan, yang akan dibebankan sebagai                                  charged as expense when the project contract is
   beban kontrak pada saat proyek tersebut                                        executed.
   dilaksanakan.

   Aset lain-lain - bagi hasil terdiri dari:                                      Other assets - profit sharing consists of:
                                                                                        Harga Perolehan/
                                                                                          Historical Cost
                                                                             30 September/              31 Desember/            Lokasi/
                           Nama Proyek Bagi Hasil/
                                                                           September 30, 2024         December 31, 2023        Location
                         Name of Profit Sharing Project                           Rp                         Rp

            1 Teraskita Bandung                                                    91.143.019.386          91.143.019.386       Bandung
            2 Teraskita Makasar                                                   127.144.469.847         127.144.469.847       Makasar
          Sub Jumlah/ Sub Total                                                   218.287.489.233         218.287.489.233
          Akumulasi Amortisasi Aset Lain-lain Bagi Hasil/
              Accumulated Amortization Other Asset - Profit Sharing               (13.642.968.072)         (7.795.981.758)
          Jumlah/ Total                                                           204.644.521.161        210.491.507.475


   Aset lain-lain - bagi hasil merupakan penambahan                               Other assets - profit sharing is the addition of
   dari konstruksi dalam penyelesaian Hotel Dafam                                 construction completion of Hotel Dafam Teraskita in
   Teraskita di Bandung dan Makassar sebesar                                      Bandung       and     Makassar     amounting     to
   Rp204.644.521.161 dan Rp210.491.507.475 pada                                   Rp204,644,521,161 and Rp210,491,507,475 as of
   tanggal 30 September 2024 dan 31 Desember 2023.                                September 30, 2024 and December 31, 2023,
                                                                                  respectively.

   Berdasarkan Surat Pernyataan Direksi tanggal                                   Based on the Board of Directors' Statement dated
   18 April 2017, Perusahaan memberikan hak                                       April   18,    2017,     the  Company      granted
   pengembangan tanah seluas 1.535 M2 yang terletak                               the development rights of 1,535 sqm of land
   di Jl. Asia Afrika No. 55 RT 003 RW 03 Kelurahan                               located at Jl. Asia Africa No. 55 RT 003 RW 03
   Kebon Pisang Kecamatan Sumur Bandung dengan                                    Kebon Pisang Village, Sumur Bandung District with
   bukti    kepemilikan    SHGB     No.    655  atas                              proof of ownership of SHGB No. 655 on behalf of
   nama       Perusahaan     kepada     PT    Waskita                             the Company to PT Waskita Karya Realty. Based
   Karya Realty. Berdasarkan Surat Pernyataan                                     on Statement No. 81/SPN/WK/2017 dated
   No. 81/SPN/WK/2017 tanggal 29 September 2017,                                  September 29, 2017, the Company provided
   Perusahaan memberikan hak pengembangan                                         development rights to land covering an area of
   tanah seluas 1.661 m2 berdasarkan SHGB                                         1,661 sqm based on SHGB No. 20407 and an area
   No. 20407 dan seluas 168 m2 berdasarkan SHGB                                   of 168 sqm based on SHGB No. 20403 on behalf
   No. 20403 atas nama Perusahaan, yang terletak di                               of the Company, located at Jalan Jl. A.P. Pettarani

                                                                       - 107 -
Page 111
PT WASKITA KARYA (PERSERO) Tbk                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                           (Expressed in Rupiah, unless otherwise stated)

   Jalan Jl. A.P. Pettarani 88 RT 002 RW 02 Kelurahan                    88 RT 002 RW 02 Village Buakana Rappocini
   Buakana Kecamatan Rappocini Kota Makassar.                            District, Makassar City

   Kas yang dibatasi penggunaannya merupakan                             Restricted cash is an amount of cash whose use has
   sejumlah kas yang telah ditentukan pengunaannya                       been determined so that it cannot be used freely.
   sehingga tidak dapat digunakan secara bebas.

   Aset lain-lain tanah dan bangunan yaitu apartemen                     Other assets land and buildings, namely apartments
   sejumlah 50 unit yang merupakan pembayaran                            totaling 50 units, which are payments in the form of
   berupa aset atas piutang usaha dan retensi dari                       assets for trade receivables and retention from
   PT Ade Pede Realty pada tanggal 24 Mei 2022.                          PT Ade Pede Realty on May 24, 2022.

   Perusahaan tidak menggunakan tanah dan                                The Company does not use the land and
   apartemen tersebut dalam kegiatan operasional                         the apartments in its operations or rental to the third
   ataupun menyewakannya kepada pihak ketiga,                            parties in line with those assets is not
   sehubungan aset tersebut tidak terkait dengan                         related to the main activities of the Company.
   kegiatan     utama      Perusahaan.    Perusahaan                     The management believes that the land and
   berpendapat bahwa apartemen tanah tersebut tidak                      the apartments do not meet the criteria to be
   memenuhi kriteria untuk diklasifikasikan sebagai                      classified as fixed assets, so that those assets are
   aset tetap, sehingga mencatat aset tersebut di atas                   recorded as other assets.
   sebagai aset lain-lain.

   Perangkat lunak terdiri dari:                                         Software consists of:
                                                                                      30 September/ September 30, 2024
                                                                Harga Perolehan/            Akumulasi Amortisasi/        Nilai Buku/
                                                                 Historical Cost          Accumulated Amortization       Book Value
                                                                       Rp                            Rp                      Rp

   SAP S/4 Hana                                                     130.450.129.426                   117.354.079.868       13.096.049.558
   Building Information Modelling                                     7.462.259.602                     6.542.758.976          919.500.626
   Lain-lain/ Other s (dibawah/ below Rp 500 Juta/ Million )          8.384.843.421                     3.045.393.500        5.339.449.921
   Jumlah/ Total                                                    146.297.232.449                   126.942.232.344       19.355.000.105


                                                                                      31 Desember/ December 31, 2023
                                                                Harga Perolehan/           Akumulasi Amortisasi/         Nilai Buku/
                                                                 Historical Cost         Accumulated Amortization        Book Value
                                                                       Rp                           Rp                       Rp

   SAP S/4 Hana                                                     130.450.129.426                    98.471.320.963       31.978.808.463
   Building Information Modelling                                     7.462.259.602                     4.115.345.113        3.346.914.489
   ERP MS Dynamics AX2012                                            49.421.936.841                    49.421.936.841                    --
   Lain-lain/ Others (dibawah/ below Rp 500 Juta/ Million )           8.384.843.421                     1.436.910.021        6.947.933.400
   Jumlah/ Total                                                    195.719.169.290                   153.445.512.938       42.273.656.352


   Aset tidak lancar lainnya                                             Other non-current assets

   Berdasarkan Berita Acara Evaluasi Perubahan                           Based on the Minutes of Evaluation of Changes to
   Rencana Usaha Pengusahaan Jalan Tol Krian -                           the Krian - Legundi - Bunder - Manyar Toll Road
   Legundi - Bunder - Manyar No. 57/BA/Pt.6/2022                         Concession Business Plan No. 57/BA/Pt.6/2022
   tanggal 19 Juli 2022, WBW dan BPJT sepakat                            dated July 19, 2022, WBW and BPJT agreed to
   melakukan penyesuaian Rencana Usaha Jalan Tol                         make adjustments to the KLBM Toll Road
   KLBM, yang mengakibatkan konstruksi dan                               Business Plan, which resulted in the construction
   pengusahaan Seksi IV (Bunder-Manyar) sepanjang                        and concession of 9.39 km Section IV (Bunder-
   9,39 km di bundling dengan pengusahaan                                Manyar) being bundling with the concession of
   jalan tol Tuban-Gresik. Berdasarkan hal tersebut,                     the Tuban - Gresik toll road. Based on
   WBW melakukan reklasifikasi dari Aset Dalam                           the foregoing, WBW reclassified from Intangible
   Penyelesaian Aset Tak Berwujud           - Hak                        Assets - Toll Road Concession Rights to other
   Pengusahaan Jalan Tol ke aset lain-lain sebesar                       assets in the amount of Rp781,512,004,363.
   Rp781.512.004.363.

   WBW melakukan pencadangan beban kerugian                              WBW provided allowance for impairment losses on
   penurunan nilai atas potensi kemungkinan aset                         potential assets under construction that cannot be
   dalam penyelesaian yang tidak dapat terpulihkan                       recovered as Rp330.491.418.860 which was
   Rp330.491.418.860     yang       tercatat sebagai                     recorded as Other Income (Expenses) – Net.
   pendapatan (beban) Lain - lain - Bersih.

                                                               - 108 -
Page 112
PT WASKITA KARYA (PERSERO) Tbk                                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                        (Expressed in Rupiah, unless otherwise stated)

22. ASET TAK BERWUJUD – HAK PENGUSAHAAN                                                         22. INTANGIBLE   ASSETS                                –         TOLL           ROAD
    JALAN TOL                                                                                       CONCESSION RIGHTS
                                                                            30 September/ September 30, 2024
                                 Saldo Awal/         Penambahan/          Pengurangan/           Reklasifikasi/          Penyesuaian/          Saldo Akhir/
                              Beginning Balance       Additions            Deductions           Reclassification          Adjustment          Ending Balance
                                     Rp                  Rp                    Rp                      Rp                     Rp                    Rp
   Biaya Perolehan                                                                                                                                                           Acquisition Cost
    Ruas Jalan Tol :                                                                                                                                                       Toll Road Section :
     Krian-Legundi-Bunder       10.796.542.312.941                   --                    --        934.022.981.127                     --    11.730.565.294.068      Krian-Legundi-Bunder
     Pemalang - Batang           7.869.740.216.309                   --                    --                      --                    --     7.869.740.216.309         Pemalang - Batang
     Kayu Agung -                                                                                                                                                               Kayu Agung -
      Palembang - Betung         3.076.660.137.454                   --                    --       2.036.308.185.582     (216.638.096.409)     4.896.330.226.627       Palembang - Betung
     Pasuruan - Probolinggo      4.176.882.493.840                   --                    --           9.912.706.899                    --     4.186.795.200.739     Pasuruan - Probolinggo
     Ciawi - Sukabumi            4.605.402.061.725                   --    4.605.402.061.725                        --                   --                     --          Ciawi - Sukabumi
                                30.525.227.222.269                   --    4.605.402.061.725        2.980.243.873.608     (216.638.096.409)    28.683.430.937.743
   Aset Dalam Penyelesaian                                                                                                                                           Construction in Progress
    Ruas Jalan Tol :                                                                                                                                                       Toll Road Section :
     Krian-Legundi-Bunder          922.673.040.372      11.349.940.754                     --       (934.022.981.126)                    --                     --     Krian-Legundi-Bunder
     Kayu Agung -                                                                                                                                                               Kayu Agung -
     Palembang - Betung         14.675.937.968.667     188.967.800.147                     --     (2.057.939.557.921)                    --    12.806.966.210.893       Palembang - Betung
    Pasuruan - Probolinggo       1.567.118.255.749      33.506.486.503                     --         (9.912.706.899)                    --     1.590.712.035.353     Pasuruan - Probolinggo
    Ciawi - Sukabumi             2.647.682.620.355      23.140.219.117     2.670.952.598.642              129.759.170                    --                     --          Ciawi - Sukabumi
                                19.813.411.885.143     256.964.446.521     2.670.952.598.642      (3.001.745.486.776)                    --    14.397.678.246.246
   Akumulasi                                                                                                                                                                     Accumulated
    Amortisasi                                                                                                                                                                    Amortization
    Ruas Jalan Tol :                                                                                                                                                       Toll Road Section :
     Krian-Legundi-Bunder          149.220.618.082      51.799.127.017                     --                       --                   --      201.019.745.099       Krian-Legundi-Bunder
     Pemalang - Batang             417.658.072.164      76.594.587.303                     --                       --                   --      494.252.659.467          Pemalang - Batang
     Kayu Agung -                                                                                                                                                               Kayu Agung -
      Palembang - Betung           155.303.927.873      46.543.072.618                     --        (21.631.372.338)                    --      180.215.628.153        Palembang - Betung
     Pasuruan - Probolinggo         67.647.465.190      18.816.745.893                     --                       --                   --       86.464.211.083      Pasuruan - Probolinggo
     Ciawi - Sukabumi              156.264.753.776       3.101.926.454       159.496.439.400              129.759.170                    --                    --           Ciawi - Sukabumi
                                   946.094.837.085     196.855.459.285       159.496.439.400         (21.501.613.168)                    --      961.952.243.802
   Nilai Tercatat               49.392.544.270.327                                                                                             42.119.156.940.187              Carrying Value




                                                                          31 Desember 2023/ December 31, 2023
                                 Saldo Awal/         Penambahan/          Pengurangan/           Reklasifikasi/          Penyesuaian/          Saldo Akhir/
                              Beginning Balance       Additions            Deductions           Reclassification          Adjustment          Ending Balance
                                     Rp                  Rp                   Rp                      Rp                      Rp                    Rp
   Biaya Perolehan                                                                                                                                                           Acquisition Cost
    Ruas Jalan Tol :                                                                                                                                                       Toll Road Section :
     Krian-Legundi-Bunder       10.796.542.312.941                   --                    --                       --                   --    10.796.542.312.941      Krian-Legundi-Bunder
     Pemalang - Batang           7.869.740.216.309                   --                    --                       --                   --     7.869.740.216.309         Pemalang - Batang
     Kayu Agung -                                                                                                   --                                                          Kayu Agung -
      Palembang - Betung         3.076.660.137.454                   --                    --                       --                   --     3.076.660.137.454       Palembang - Betung
     Pasuruan - Probolinggo      4.176.882.493.840                   --                    --                       --                   --     4.176.882.493.840     Pasuruan - Probolinggo
     Ciawi - Sukabumi            4.605.402.061.725                   --                    --                       --                   --     4.605.402.061.725           Ciawi - Sukabumi
                                30.525.227.222.269                   --                    --                       --                   --    30.525.227.222.269
   Aset Dalam Penyelesaian                                                                                                                                           Construction in Progress
    Ruas Jalan Tol :                                                                                                                                                      Toll Road Section :
    Krian-Legundi-Bunder           877.846.492.601      44.826.547.771                     --                       --                   --      922.673.040.372       Krian-Legundi-Bunder
    Kayu Agung -                                                                                                                                                               Kayu Agung -
     Palembang - Betung         13.373.450.893.251    1.302.487.075.416                    --                       --                   --    14.675.937.968.667       Palembang - Betung
    Pasuruan - Probolinggo       1.189.424.872.407      377.693.383.342                    --                       --                   --     1.567.118.255.749     Pasuruan - Probolinggo
    Ciawi - Sukabumi             2.182.608.557.843      465.074.062.512                    --                       --                   --     2.647.682.620.355          Ciawi - Sukabumi
                                17.623.330.816.102    2.190.081.069.041                    --                       --                   --    19.813.411.885.143
   Akumulasi                                                                                                                                                                     Accumulated
    Amortisasi                                                                                                                                                                    Amortization
    Ruas Jalan Tol :                                                                                                                                                       Toll Road Section :
     Krian-Legundi-Bunder           81.913.759.242      67.306.858.840                     --                       --                   --      149.220.618.082       Krian-Legundi-Bunder
     Pemalang - Batang             326.407.370.251      91.250.701.913                     --                       --                   --      417.658.072.164          Pemalang - Batang
     Kayu Agung -                                                                                                                                                               Kayu Agung -
      Palembang - Betung            58.643.526.581      96.660.401.292                     --                       --                   --      155.303.927.873        Palembang - Betung
     Pasuruan - Probolinggo         49.577.922.636      18.069.542.554                     --                       --                   --       67.647.465.190      Pasuruan - Probolinggo
     Ciawi - Sukabumi              115.412.148.619      40.852.605.157                     --                       --                   --      156.264.753.776            Ciawi - Sukabumi
                                   631.954.727.329     314.140.109.756                     --                       --                   --      946.094.837.085
   Nilai Tercatat               47.516.603.311.042                                                                                             49.392.544.270.327              Carrying Value



   Aset dalam penyelesaian direklasifikasi menjadi                                                   Construction in progress reclassified as acquisition
   biaya perolehan hak pengusahaan jalan tol ketika                                                  cost of toll road concession rights when toll road
   masa konstruksi telah selesai dan mulai beroperasi.                                               construction has completed and start operating.
   Penyesuaian pada hak pengusahaan jalan tol                                                        Adjustment on toll road concession rights is due to
   disebabkan oleh revaluasi hak pengusahaan jalan                                                   revaluation. Amortization expense of toll road
   tol. Beban amortisasi hak pengusahaan jalan tol                                                   consession rights recorded in cost of revenues toll
   dicatat sebagai beban pokok pendapatan jalan tol.                                                 road.



                                                                                      - 109 -
Page 113
PT WASKITA KARYA (PERSERO) Tbk                                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                      (Expressed in Rupiah, unless otherwise stated)

23. ASET KEUANGAN ATAS PROYEK KONSESI                                          23. FINANCIAL          ASSETS         FROM         CONCESSION
                                                                                   PROJECT
                                                                 30 September/          31 Desember/
                                                               September 30, 2024     December 31, 2023
                                                                      Rp                     Rp

   Pembayaran Kapasitas Minimum di Masa Depan:                                                                      Future Minimum Capacity Payment:
    Tidak Lebih dari Satu Tahun                                     26.480.295.875        41.011.009.189                       Not Later than One Year
    Lebih dari Satu Tahun Tetapi Tidak Lebih Dari Lima Tahun        87.192.181.768        93.004.993.886      Later than One Year Later than Five Year
    Lebih dari Lima Tahun                                          239.778.771.400       251.404.395.635                           Later than Five Year
   Jumlah Pembayaran Kapasitas Minimum di Masa Depan               353.451.249.043       385.420.398.710      Total Future Minimum Capacity Payments

   Penurunan nilai aset keuangan                                    65.394.407.864        65.394.407.864                Impairment of Financial Assets
   Pendapatan Keuangan yang Belum Diterima                          67.761.957.252        75.872.667.474              Less Unearned Financial Income
   Nilai Sekarang dari Pembayaran Kapasitas Masa Depan             220.294.883.927       244.153.323.372    Present Value of Future Capacity Payments
   Dikurangi: Bagian yang Jatuh Tempo Dalam Satu Tahun              16.696.496.389        30.382.221.195                               Current Portion
   Bagian Jangka Panjang                                           203.598.387.538       213.771.102.177                         Non-Current Portion



   Akun ini merupakan piutang tidak lancar dari PLN                                  This account represents non-current receivable
   sehubungan      dengan     pembayaran    kapasitas                                from PLN in relation to the future minimum
   minimum masa depan yang tercantum dalam PPA                                       capacity payments set forth in PPA that have been
   yang telah diklasifikasikan sebagai aset keuangan                                 classified as financial asset as a result of adoption
   sebagai hasil penerapan ISAK 112.                                                 of ISAK 112.
   Pada tanggal 9 Desember 2016, WSE memulai                                         On December 9, 2016, WSE had its commercial
   operasi komersial (COD) untuk proyek konsesi ini.                                 operation date (COD) on this concession project. As
   Pada 30 September 2024 dan 2023, WSE mengakui                                     of September 30, 2024 and 2023, WSE recognized
   pendapatan konsesi masing-masing sebesar                                          the    concession    revenues     amounting      to
   Rp15.893.494.275 dan Rp28.934.398.457.                                            Rp15,893,494,275       and       Rp28,934,398,457
                                                                                     respectively.
   Fasilitas pembangkit tenaga mini hidro (infrastruktur)                            Mini hydro power generating facility (infrastructure)
   telah dijadikan jaminan untuk pinjaman jangka                                     has been pledged as collateral for long-term loan
   panjang dari pihak ketiga.                                                        from the third party.

24. UTANG USAHA                                                                24. ACCOUNTS PAYABLE

                                                         30 September/             31 Desember/
                                                       September 30, 2024       December 31, 2023*)
                                                              Rp                        Rp
   Pemasok                                                 2.147.436.407.908          2.819.775.554.465                                     Suppliers
   Subkontraktor                                           1.762.620.916.244          2.025.736.828.081                               Subcontractors
   Sewa Alat                                                 310.681.049.088            454.400.404.079                             Rental Equipment
   Upah Kerja                                                171.502.024.346            240.431.207.080                                       Wages
   Lain-lain                                                 341.511.222.872            298.672.925.186                                        Others
   Jumlah                                                  4.733.751.620.458          5.839.016.918.891                                           Total

   *) Direklasifikasi kembali pada Catatan 61                                                                              *) As reclassified in Note 61


   Tidak ada bunga yang dibebankan pada utang                                        No interest is charged to the accounts payable due.
   usaha yang sudah jatuh tempo.


25. UTANG BANK JANGKA PENDEK                                                   25. SHORT-TERM BANK LOANS

                                                                                                30 September/                31 Desember/
                                                                                              September 30, 2024           December 31, 2023
                                                                                                     Rp                           Rp
   Pihak Ketiga/ Third Parties
    Entitas Anak/ Subsidiary Entity - WBP
     PT Bank DKI                                                                                      671.127.052.202              671.127.052.202
    Entitas Anak/ Subsidiary Entity - WKR
     PT BPR Inti Dana Sukses Makmur                                                                    29.000.000.000               29.000.000.000
   Jumlah/ Total                                                                                      700.127.052.202              700.127.052.202




                                                                        - 110 -
Page 114
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

   WBP                                                               WBP

   PT Bank DKI                                                       PT Bank DKI
   Berdasarkan Surat No. 936/SPPK/910/VI/2020                        Based on Letter No. 936/SPPK/910/VI/2020 dated
   tanggal 2 Juni 2020 mengenai Surat Pemberitahuan                  June 2, 2020, regarding Credit Approval Notification
   Persetujuan Kredit (SPPK), telah disetujui                        Letter, it has been approved to increase the KMK
   penambahan limit fasilitas KMK pinjaman Tetap                     Fixed Term Loan facility limit to Rp700,000,000,000
   Berjangka menjadi Rp700.000.000.000 dan Sublimit                  and Sublimit Non-Cash Loan amounting to
   Non-Cash Loan sebesar Rp300.000.000.000.                          Rp300,000,000,000. The loan period is until
   Jangka     waktu    pinjaman   sampai    dengan                   June 15, 2021. The interest rate is at 9.50% per
   15 Juni 2021. Suku bunga sebesar 9,50% per tahun.                 annum.

   Pembatasan:                                                       Negative Convenant:
   1.   Mengalihkan hak atas agunan yang sudah                       1.   Transferring the right to collateral that has been
        dijaminkan ke Bank DKI kepada pihak lain.                         pledged to Bank DKI to another party.
   2.   Mengikatkan diri sebagai penjamin hutang atau                2.   Binding themselves as guarantor of debt or
        menjaminkan harta kekayaan Perusahaan yang                        pledging the Company’s assets that have been
        sudah dijaminkan ke Bank DKI kepada pihak                         pledged to Bank DKI to other parties.
        lain.
   3.   Mengalihkan/menyerahkan kepada pihak lain,                   3.   Transferring/surrending to other parties, in part
        sebagian atau seluruhnya atas hak dan                             or in whole for rights and obligations arising in
        kewajiban yang timbul berkaitan dengan fasilitas                  connection with Debtor credit facilities at Bank
        kredit Debitur di Bank DKI.                                       DKI.
   Bank DKI pada tanggal 5 Juli 2022 mengajukan                      Bank DKI on July 5, 2022, filed a cassation to
   kasasi kepada Mahkamah Agung Republik                             the Supreme Court of the Republic of Indonesia with
   Indonesia dengan register perkara No. 1455                        case register No. 1455 K/Pdt.Sus-Pailit/2022
   K/Pdt.Sus-Pailit/2022 (“Permohonan Kasasi”) atas                  (“Cassation Application”) on the ratification
   pengesahan (homologasi) Perjanjian Perdamaian                     (homologation) of the Reconciliation Agreement by
   oleh Majelis Hakim pada Pengadilan Niaga pada                     the Panel of Judges at the Commercial Court at
   Pengadilan Negeri Jakarta Pusat pada perkara                      the Central Jakarta District Court in case
   No.        497/Pdt.Sus-PKPU/2021/PN.Niaga.Jkt.Pst                 No.       497/Pdt.Sus-PKPU/2021/PN.Niaga.Jkt.Pst
   (“Perjanjian Perdamaian”).                                        (“Reconciliation Agreement”).
   Fasilitas pinjaman ini dijamin dengan piutang usaha               This loan facility is colaterallized by trade receivable
   atas proyek Pemerintah Republik Indonesia dengan                  from Government projects of the Republic of
   nilai sebesar minimal Rp750.000.000.000.                          Indonesia      with      a     minimum       value    of
                                                                     Rp750,000,000,000.
   Berdasarkan Memori Kasasi terhadap Putusan                        Based on the Memorandum of Cassation against
   Pengesahan Perdamaian (Homologasi) Pengadilan                     the Commercial Court Ratification of Peace
   Niaga pada Pengadilan Negeri Jakarta Pusat No.                    (Homologation) Decision at the Central Jakarta
   497/PDT.SUS-PKPU/2021/PN.NIAGA/JKT.          PST                  District     Court     No.     497/PDT.SUS/PKPU/
   antara PT Bank DKI (Pemohon Kasasi) melawan                       2021/PN.NIAGA/JKT.PST between PT Bank DKI
   Perusahaan (dalam PKPU) (Termohon Kasasi) No.                     (the Petitioner for Cassation) and the Company (in
   177/BDKI WSBP/DS-WS/VII/2022 tanggal 5 Juli                       PKPU)         (Respondent        for     Cassation)
   2022, PT Bank DKI sebagai pemohon kasasi                          No. 177/BDKIWSBP/DS-WS/VII/2022 dated July 5,
   menyampaikan memori kasasi ke Mahkamah Agung                      2022, PT Bank DKI as the applicant for cassation
   RI melalui kepaniteraan Pengadilan Niaga pada                     submitted a memorandum of cassation to
   Pengadilan Negeri Jakarta Pusat yaitu Permohonan                  the Supreme Court of the Republic of Indonesia
   Pembatalan Putusan Pengesahan Perdamaian                          through the clerk of the Commercial Court at
   (Homologasi) Perusahaan (dalam PKPU).                             the Central Jakarta District Court, namely
                                                                     the Application for Cancellation Decision on
                                                                     Ratification    of   Peace      (Homologation)   of
                                                                     the Company (in PKPU).
   Berdasarkan surat dari Pengadilan Negeri                          Based on a letter from the District Court Central
   Jakarta    Pusat     Kelas      I    A     Khusus                 Jakarta Class I A Special No. W10.U1/81/HT.02/I/
   No. W10.U1/81/HT.02/I/2022.03.Hry tanggal 5                       2022.03.Hry dated January 5, 2023, regarding
   Januari   2023    perihal    pemberitahuan    dan                 the notification and submission of a copy of
   penyampaian salinan putusan Mahkamah Agung RI                     the decision of the Supreme Court of the Republic of
   No. 445/K/Pdt.SusPailit/2022.Jo.497/Pdt.Sus/PKPU/                 Indonesia      No.1445/K/Pdt.Sus-Pailit/2022.Jo.497/

                                                           - 111 -
Page 115
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   2021/PN/Niaga.Jkt.Pst. Bahwa Mahkamah Agung RI                   Pdt.Sus/ PKPU/2021/PN Niaga. Jkt. Pst. Where
   memutuskan menolak permohonan kasasi dari Para                   the Supreme Court of the Republic of Indonesia
   Pemohon Kasasi PT Bank DKI.                                      decided to reject the cassation petition from
                                                                    the Cassation Appellant PT Bank DKI.

   Berdasarkan      surat    dari   PT     Bank    DKI              Based on a letter from PT Bank DKI
   No. 02/DIR/KKM/I/2023 tanggal 31 Januari 2023                    No. 02/DIR/KKM/I/2023 dated January 31, 2023
   perihal Penyampaian Tenggat Waktu Pelaksanaan                    regarding Submission of the Deadline for
   Restrukturisasi Kredit Diluar Perjanjian Perdamaian              Implementation of Credit Restructuring Outside
   setelah PKPU Berakhir, dimana PT Bank DKI                        the Peace Agreement after PKPU Ends, where
   menghormati proses internal yang dilakukan WBP                   PT Bank DKI respects the internal processes carried
   dalam pelaksanaan restrukturisasi kredit diluar                  out by WBP in implementing credit restructuring
   Perjanjian     Perdamaian,      namun       demikian             outside the Settlement Agreement, however, due to
   sehubungan dengan telah berlarut-larutnya proses                 the protracted nature of this process, we hope that
   ini maka kami berharap WBP dapat melakukan                       WBP will be able to sign the Credit Agreement
   penandatanganan Adendum Perjanjian Kredit                        Addendum with PT Bank DKI no later than February
   dengan PT Bank DKI selambat lambatnya tanggal                    17, 2023. If by the specified deadline the Company
   17 Februari 2023. Apabila sampai dengan tenggat                  cannot sign the Credit Agreement addendum, then
   waktu yang telah ditetapkan Perusahaan tidak dapat               WBP credit facility will experience a decrease in
   melakukan penandatanganan addendum Perjanjian                    credit quality where this will have an impact on
   Kredit, maka atas fasilitas kredit Perusahaan akan               the Company business credit facility at Bank DKI in
   mengalami penurunan kualitas kredit dimana hal                   accordance with the credit provisions regarding one
   tersebut akan berdampak pada fasilitas kredit induk              obligor.
   usaha Perusahaan yang ada di Bank DKI sesuai
   dengan ketentuan perkreditan mengenai one
   obligor.

   Berdasarkan Surat No 196/WBP/DIR/2023 tanggal                    Based       on     Letter    No    196/WBP/DIR/2023
   8 Februari 2023 perihal tanggapan atas surat                     dated February 8, 2023 regarding the response to
   PT Bank DKI No 02/DIR/KKM/I/2023 tanggal                         PT Bank DKI's letter No 02/DIR/KKM/I/2023 dated
   31 Januari 2023, secara prinsip WBP berkomitmen                  January 31, 2023, in principle WBP is committed to
   untuk menyelesaikan kewajiban yang kami miliki                   fulfilling our obligations to PT Bank DKI as well as
   kepada PT Bank DKI serta terbuka atas usulan                     being open to Bank DKI's proposals while still
   Bank DKI dengan tetap memperhatikan aspek                        paying attention to compliance aspects and legal
   kepatuhan serta risiko-risiko hukum yang dapat                   risks that may arise to WBP in connection with
   timbul      kepada     WBP     sehubungan    dengan              the implementation of Bank DKI's proposals,
   pelaksanaan usulan Bank DKI, terutama atas                       especially regarding the potential risk of lawsuits
   potensi risiko gugatan pembatalan Perjanjian                     canceling the Settlement Agreement which has an
   Perdamaian yang berdampak merugikan seluruh                      adverse impact on all creditors including Bank DKI
   kreditur termasuk Bank DKI dan WBP. WBP yakin                    and WBP. WBP believes that WBP considerations
   bahwa pertimbangan WBP sejalan dengan                            are in line with the Legal Opinion of Bank DKI. In
   Pendapat Hukum Bank DKI. Guna mendapatkan                        order to obtain certainty that the implementation of
   kepastian bahwa pelaksanaan restrukturisasi kredit               credit restructuring in the future does not pose risks
   di kemudian hari tidak menimbulkan risiko                        as stated in the Legal Opinion of Bank DKI and other
   sebagaimana disampaikan dalam Pendapat Hukum                     legal risks due to negligence in carrying out
   Bank DKI dan risiko hukum lainnya akibat kelalaian               the Settlement Agreement which has permanent
   melaksanakan Perjanjian Perdamaian yang telah                    legal force, then the Company believes that
   berkekuatan hukum tetap, maka WBP beranggapan                    the proposal to change the Bank DKI Restructuring
   bahwa usulan perubahan Tranche Restrukturisasi                   Tranche which was originally Tranche B and
   Bank DKI yang semula adalah Tranche B dan                        Tranche C to Tranche A can be accommodated by
   Tranche C menjadi Tranche A dapat diakomodir                     WBP by first making a request to all creditors for
   WBP        dengan     terlebih   dahulu   melakukan              Bank DKI's plan with reference to article 5.7 of
   permohonan kepada seluruh kreditur atas                          the Settlement Agreement, namely "changes to
   rencana Bank DKI dengan mengacu kepada                           the Settlement Agreement can only amended or
   pasal 5.7 Perjanjian Perdamaian yaitu perubahan                  amended based on a proposal or request from
   Perjanjian Perdamaian hanya dapat diubah atau                    WBP, provided that it is approved by 50% of
   diamandemen berdasarkan usulan atau permintaan                   the total value of the Creditor's invoice that submits
   dari WBP, dengan catatan disetujui oleh 50% dari                 the invoice in the PKPU process.
   total nilai tagihan Kreditur yang mengajukan tagihan
   dalam proses PKPU.



                                                          - 112 -
Page 116
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


   Berdasarkan Perjanjian Perdamaian, penyelesaian                    According to the Composition Plan, debt settlement
   utang Bank DKI akan diselesaikan melalui Golongan                  of Bank DKI shall be settled through Tranche B and
   Tranche B dan Tranche C dari Perjanjian                            Tranche C of the Reconciliation Agreement as
   Perdamaian sebagai berikut:                                        follows:

   Berdasarkan    Nota     Kesepahaman     antara                     Based on the Memorandum of Understanding
   PT Bank DKI dengan WBP, dengan Bank DKI                            between PT Bank DKI and the Company with
   No. 09/MOU/DIR /II/2023 dan Perusahaan dengan                      Bank    DKI     No.     09/MOU/DIR/II/2023        and
   No.      001/MOU/WBP      /DIR/2023    tanggal                     No.   WSBP      001/MOU/WBP/DIR/2023            dated
   21 Februari 2023, dengan ketentuan sebagai                         February 21, 2023, with the following conditions:
   berikut:

   1.   Tujuan Nota Kesepahaman adalah untuk                          1.   The purpose of the Memorandum of
        terwujudnya pelaksanaan restrukturisasi fasilitas                  Understanding is to realize the implementation
        kredit modal kerja Perusahaan sesuai                               of the restructuring of the Company’s working
        Tranche A Perjanjian Perdamaian, setelah                           capital credit facility in accordance with Tranche
        dilaksanakannya     Addendum         Perjanjian                    A of the Settlement Agreement, following
        Perdamaian;                                                        the implementation of the Addendum to
                                                                           the Settlement Agreement.
   2.   Setelah ditandatanganinya Nota Kesepahaman                    2.   After     signing       the     Memorandum      of
        dan dipenuhi Persyaratan Adendum Perjanjian                        Understanding and fulfilling the Requirements
        Perdamaian,      maka      Perusahaan      akan                    for the Addendum to the Peace Agreement,
        melanjutkan pembuatan dan penandatanganan                          the Company will continue to draw up and sign
        Addendum Perjanjian Perdamaian;                                    the Addendum to the Peace Agreement;
   3.   WBP akan mengirimkan surat pemberitahuan                      3.   WBP will send a written notification letter to all
        tertulis   kepada    seluruh   kreditur    WBP                     WBP creditors (Written Notification Letter) no
        (Surat Pemberitahuan Tertulis) selambat-                           later than 14 calendar days from the date this
        lambatnya 14 hari kalender sejak tanggal                           Memorandum of Understanding was signed;
        ditandatanganinya Nota Kesepahaman ini;
   4.   Setelah diterimanya tanggapan atas Surat                      4.   After receiving a response to the Written
        Pemberitahuan Tertulis dari para kreditur WBP                      Notification Letter from the creditors of WBP
        (Tanggapan Kreditur), maka Perusahaan wajib                        (Creditors Response), the Company is required
        menyampaikan tanggapan kreditur kepada bank                        to submit the creditor's response to the bank no
        selambat-lambatnya 5 hari kerja sejak tanggal                      later than 5 working days from the date of
        diterimanya Tanggapan Kreditur;                                    receipt of the Creditor's Response;
   5.   WBP upaya dan/atau terbaiknya Bank akan                       5.   The Company and/or the Bank will make their
        untuk          melakukan           pelaksanaan                     best efforts so that the signing of
        penandatanganan        Adendum        Perjanjian                   the Addendum to the Peace Agreement can be
        Perdamaian dapat terpenuhi;                                        fulfilled;
   6.   Nota kesepahaman berlaku dalam kurun waktu                    6.   This Memorandum of Understanding is valid
        60       hari   kalender      sejak     tanggal                    within 60 calendar days from the date this
        ditandatanganinya Nota Kesepahaman ini oleh                        Memorandum of Understanding was signed by
        para pihak dan dapat dilakukan perpanjangan                        the parties and can be extended based on
        berdasarkan kesepakatan para pihak menjadi                         the agreement of the parties to be Tranche A;
        Tranche A;
   7.   Bank DKI dan WBP sepakat untuk tunduk pada                    7.   Bank DKI and WBP agree to comply with
        ketentuan Pasal 5.7 Perjanjian Perdamaian                          the provisions of Article 5.7 of the Settlement
        yang mengatur bahwa mekanisme addendum                             Agreement         which      stipulates     that
        Perjanjian Perdamaian harus dilakukan dengan                       the mechanism for the Addendum to
        mendapatkan persetujuan dari 50% dari total                        the Settlement Agreement must be carried out
        nilai tagihan kreditur WBP yang mengajukan                         by obtaining approval from 50% of the total
        tagihan dalam proses PKPU.                                         value of the WBP creditor's bill that submits a
                                                                           bill in the PKPU process.

   Pada tanggal 30 September 2024 dan 31 Desember                     As of September 30, 2024 and December 31, 2023,
   2023, saldo pinjaman jangka pendek WBP kepada                      the balance of short-term loan of WBP to PT Bank
   PT     Bank     DKI    masing-masing    sebesar                    DKI amounting to Rp671,127,052,202 respectively.
   Rp671.127.052.202.

   Berdasarkan Perjanjian Perdamaian dalam PKPU                       Based on the Reconciliation Agreement in PKPU
   fasilitas pinjaman ini direstrukturisasi menjadi Utang             this loan facility was restructured into Long-Term

                                                            - 113 -
Page 117
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

   Bank Jangka Panjang. Pada tanggal 30 September                  Bank Loans and. As of September 30, 2024 and
   2024 dan 31 Desember 2023, saldo pinjaman                       December 31, 2023, the balance of long-term loan
   jangka panjang WBP kepada PT Bank DKI masing-                   of WBP to PT Bank DKI amounting to
   masing sebesar Rp118.434.185.683.                               Rp118,434,185,683 respectively.

   WKR                                                             WKR

   PT BPR Intidana Sukses Makmur                                   PT BPR Intidana Sukses Makmur

   Pada tanggal 28 Desember 2022, WKR                              On December 28, 2022, WKR obtained contract
   menandatangani       kontrak      perjanjian    No.             agreement No. 0114/ISM-SME/SPPKKMKDL/1222
   0114/ISMSME/-SPPK-KMKDL/1222 dengan PT                          with PT BPR Intidana Sukses Makmur related to
   BPR Intidana Sukses Makmur terkait dengan                       loan facility amounting to Rp15,000,000,000. This
   fasilitas pinjaman sebesar Rp15.000.000.000.                    loan facility is used as working capital with term 12
   Fasilitas pinjaman ini merupakah fasilitas modal                months after signing of the contract with interest rate
   kerja dengan jangka waktu fasilitas pinjaman adalah             of 16.00% per annum. The credit facilities are
   12 bulan dengan tingkat suku bunga 16,00% per                   secured by land square of 1.546 m2 located at
   tahun. Pinjaman tersebut dijamin dengan tanah                   project development of Vasaka Solterra.
   seluas 1.546 m2 di lokasi proyek pembangunan
   Vasaka Solterra.

   Perjanjian ini telah addendum tanggal 27 Desember               This aggrement has amandment on December 27,
   2023 pada perjanjian kredit No.61278/ISM/ADDPK-                 2023       based     on       contract     aggrement
   KMKDL/122023,         Perusahaan   memperpanjang                No.        61278/ISM/ADDPK-KMKDL/            122023,
   fasilitas dengan jangka waktu 12 bulan. Fasilitas               The Company extended the facility with obtained
   pinjaman ini merupakah fasilitas modal kerja dengan             approval for extension of the facility periods for 12
   jangka waktu fasilitas pinjaman adalah 12 bulan                 months. This loan facility is used to working capital
   dengan tingkat suku bunga 15,00% per tahun.                     with term 12 months after signing contract with
   Pinjaman tersebut dijamin dengan tanah di lokasi                interest rate of 15.00% per annum The credit
   proyek pembangunan Vasaka Solterra.                             facilities are secured by land locate on project
                                                                   development of Vasaka Solterra.

   Pada tanggal 28 Desember 2022, WKR                              On December 28, 2022, WKR obtained contract
   menandatangani kontrak perjanjian No. 153 dengan                agreement No. 153 with PT BPR Intidana Sukses
   PT BPR Intidana Sukses Makmur terkait dengan                    Makmur related to loan facility amounting to
   fasilitas pinjaman sebesar Rp10.000.000.000.                    Rp10,000,000,000. This aggrement has amandment
   Perjanjian ini telah addendum tanggal 22 Desember               on December 22, 2023 based on contract
   2023 pada perjanjian kredit No. 248, Perusahaan                 aggrement No. 248, The Company extended
   memperpanjang fasilitas dengan jangka waktu 12                  the facility with obtained approval for extension of
   bulan. Fasilitas pinjaman ini merupakan fasilitas               the facility periods for 12 months. This loan facility is
   modal kerjadengan jangka waktu fasilitas pinjaman               used as working capital with term 12 months after
   adalah 12 bulan dengan tingkat suku bunga 15,00%                signing of the contract with interest rate of 15.00%
   per tahun. Pinjaman tersebut dijamin dengan tanah               per annum. The credit facilities are secured by land
   di lokasi proyek pembangunan Vasaka Solterra.                   located at project development of Vasaka Solterra.

   Pada tanggal 24 Februari 2023, WFPR                             On
                                                                   a February 24, 2023, WFPR signed contract
   menandatangani kontrak perjanjian No. 171 dengan                agreement
                                                                   n             No. 171 with PT BPR Intidana Sukses
   PT BPR Intidana Sukses Makmur terkait dengan                    Makmur
                                                                   n          regarding the Demand Loan loan facility
   fasilitas pinjaman      Demand     Loan   sebesar               amounting
                                                                   u            to Rp5,000,000,000. This aggrement has
   Rp5.000.000.000. Perjanjian ini telah addendum                  amandment
                                                                   m              on February 23, 2024 based on contract
   tanggal 23 Februari 2024 pada perjanjian kredit                 aggrement No. 141, The Company extended
   No. 141, Perusahaan memperpanjang fasilitas                     the facility with obtained approval for extension of
   dengan jangka waktu 12 bulan. Fasilitas pinjaman                the facility periods for 12 months. This loan facility is
   ini merupakan fasilitas modal kerja dengan tingkat              a working capital facility with an interest rate of
   suku bunga 15,00% per tahun. Pinjaman tersebut                  15.00% per annum. The loan is secured by land at
   dijamin   dengan      tanah   di   lokasi  proyek               the Vasaka Solterra Development project site.
   Pembangunan Vasaka Solterra.

   Pada tanggal 30 September 2024 dan 31 Desember                  As of September 30, 2024 and December 31, 2023,
   2023, saldo pinjaman Grup kepada PT BPR Intidana                the balance of loan of Group to PT BPR Intidana
   Sukses     Makmur      masing-masing    sebesar                 Sukses Makmur amounting to Rp29,000,000,000,
   Rp29.000.000.000.                                               respectively.

                                                         - 114 -
Page 118
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


26. UTANG LEMBAGA KEUANGAN NON-BANK                           26. LOANS     FROM               NON-BANK           FINANCIAL
                                                                  INSTITUTION

   a.    Jangka Pendek                                               a.   Short-term

                                                                                 30 September/               31 Desember/
                                                                               September 30, 2024         December 31, 2023*)
                                                                                      Rp                          Rp

        Pihak Ketiga/ Third Parties
          Entitas anak/ Subsidiary - WKR
            PT Tez Capital Finance                                                     31.210.888.238               39.302.600.000
            Kospin Jasa                                                                19.000.000.000               19.000.000.000
        Jumlah/ Total                                                                  50.210.888.238               58.302.600.000

        *) Direklasifikasi kembali pada Catatan 61                                                      *) As reclassified in Note 61


         WKR                                                              WKR

         •    PT Tez Capital Finance                                      •    PT Tez Capital Finance

              Pada tanggal 15 November 2022, WKR                               On November 15, 2022, WKR entered into
              menandatangani kontrak perjanjian No. 8                          a contract agreement No. 8 with PT Tez
              dengan PT Tez Capital Finance terkait                            Capital Finance related to loan facility
              dengan    fasilitas pinjaman     sebesar                         amounting to Rp30,000,000,000. This loan
              Rp30.000.000.000. Fasilitas pinjaman ini                         facility will be used specifically for working
              hanya dapat digunakan untuk modal kerja                          capital with term of 12 months and interest
              dengan jangka waktu 12 bulan dan tingkat                         rate of 20.00% per annum.
              suku bunga 20,00% per tahun.

              Perjanjian ini telah addendum tanggal 20                         This aggrement has amandment on March
              Maret 2024 pada perjanjian kredit No. 14,                        20, 2024 based on credit aggrement No.
              Perusahaan      memperoleh     persetujuan                       14, the Company obtained approval for
              penambahan fasilitas kredit menjadi                              additional plafond up to Rp40,000,000,000
              Rp40.000.000.000      dan   perpanjangan                         and extension of the facility periods for 12
              periode fasilitas selama 12 bulan dan                            months and interest rate of 15.00% per
              tingkat suku bunga 15,00% per tahun.                             annum.

              Pinjaman tersebut dijamin dengan sertifkat                       The credit facilities are secured by building
              hak guna bangunan No. 00305/Batubulan,                           rights title located at No. 00305/Batubulan,
              Sukawati, Gianyar, Bali seluas 26.211 m2.                        Sukawati, Gianyar, Bali with an area of
                                                                               26,211 m2.

              Fasilitas ini mensyaratkan Perusahaan                            These facilities require the Company to
              untuk memelihara rasio keuangan sebagai                          maintain financial ratios as follows:
              berikut:

              a.    Current ratio > 1x;                                       a.   Current ratio at > 1x;
              b.    Debt to equity ratio < 5x;                                b.   Debt to equity ratio < 5x;
              c.    Rasio modal disetor terhadap total                        c.   Ratio from fully paid capital to total
                    utang min 10%.                                                 bank loan min 10%.

              Pada tanggal 30 September 2024 dan 31                           As at September 30, 2024 and December
              Desember 2023, saldo pinjaman kredit                            31, 2023, WKR credit loan balances from
              WKR dari PT Tez Capital Finance masing-                         PT Tez Capital Finance amounting to
              masing sebesar Rp31.210.888.238 and                             Rp31,210,888,238 and Rp39,302,600,000
              Rp39.302.600.000.                                               respectively.




                                                           - 115 -
Page 119
PT WASKITA KARYA (PERSERO) Tbk                                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                          (Expressed in Rupiah, unless otherwise stated)


         •    Koperasi Simpan Pinjam Jasa                                                  •    Koperasi Simpan Pinjam Jasa

              Pada tanggal 12 Mei 2023, Entitas                                                 On May 12, 2023, the Company entered
              menandatangani perjanjian No. 86 dengan                                           debt agreement No. 86 with Koperasi
              Koperasi Simpan Pinjam Jasa terkait                                               Simpan Pinjam Jasa related to loan facility
              dengan    fasilitas pinjaman     sebesar                                          amounting to Rp19,000,000,000. This loan
              Rp19.000.000.000. Fasilitas pinjaman ini                                          facility will be used specifically for working
              hanya dapat digunakan untuk modal kerja                                           capital with term of 3 months and interest
              dengan jangka waktu 3 bulan dan tingkat                                           rate of 11.00% per annum.
              suku bunga 11,00% per tahun.

              Perjanjian ini telah addendum tanggal 12                                          This aggrement has amandment on August
              Agustus 2024 pada perjanjian kredit                                               12, 2024 based on contract aggrement
              No.          009/D/Cab.Gatsu/JS/VIII/2024,                                        No.            009/D/Cab.Gatsu/JS/VIII/2024,
              Perusahaan      memperoleh      persetujuan                                       the Company obtained approval for
              perpanjangan periode fasilitas dengan jatuh                                       extension of the facility periods with a
              tempo 12 November 2024.                                                           maturity date till November 12, 2024.

              Pada tanggal 30 September 2024 dan                                                As at September 30, 2024 and December
              31 Desember 2023, saldo pinjaman kredit                                           31, 2023, WKR credit loan balances from
              WKR dari Koperasi Simpan Pinjam Jasa                                              Koperasi Simpan Pinjam Jasa amounting to
              masing-masing     adalah       sebesar                                            Rp19,000,000,000 respectively.
              Rp19.000.000.000.

   b.    Jangka Panjang                                                                    b.   Long-term


                                                                                                    30 September/               31 Desember/
                                                                                                  September 30, 2024         December 31, 2023*)
                                                                                                         Rp                          Rp

        Pihak Berelasi/ Related Parties
          Entitas anak/ Subsidiary - WTR
            PT Sarana Multi Infrastruktur (Persero) (SMI) - TJPJT                                     1.865.258.575.695            1.695.772.353.844
            PT Sarana Multi Infrastruktur (Persero) (SMI) - WBW                                       1.347.813.416.350            1.225.548.390.984
            PT Sarana Multi Infrastruktur (Persero) (SMI) - WST                                       1.100.000.000.000            1.100.000.000.000
            PT Sarana Multi Infrastruktur (Persero) (SMI) - PBTR                                        487.988.663.564              377.534.431.191
            PT Sarana Multi Infrastruktur (Persero) (SMI) Unit Syariah - TJPJT                          282.608.152.782              287.001.025.622
          Sub Jumlah/ Sub Total                                                                       5.083.668.808.391            4.685.856.201.641

        Pihak Ketiga/ Third Parties
          Entitas anak/ Subsidiary - WKI
            PT Indonesia Infrastructure Finance (IIF) - WSE                                              80.735.176.710                88.538.510.782
          Entitas anak/ Subsidiary - WTR
            PT Indonesia Infrastructure Finance (IIF) - PBTR                                          1.087.116.395.312            1.026.332.972.304
            Diskonto belum diamortisasi/ Unamortized discount                                           (37.066.657.095)             (73.752.897.931)
          Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/ Less: Current Maturities                 (10.404.445.428)             (10.404.445.428)
          Sub Jumlah/ Sub Total                                                                       1.120.380.469.499            1.030.714.139.727
        Jumlah/ Total                                                                                 6.204.049.277.890            5.716.570.341.368

        *) Direklasifikasi kembali pada Catatan 61                                                                         *) As reclassified in Note 61


   -     Kredit Sindikasi                                                            -      Syndication Loan

         TJPJT                                                                              TJPJT

         Berdasarkan Akta Notaris No. 3 dan 4 pada                                          Based on Notarial Deed No. 3 and 4 dated
         tanggal 5 Oktober 2018 oleh Efran Yuniarto                                         October 5, 2018, by Efran Yuniarto S.H., M.Kn.,
         S.H., M.Kn., Notaris di kota Jakarta, TJPJT                                        in Jakarta, TJPJT entered into Loan Syndication
         telah    menandatangani   perjanjian    Kredit                                     with PT Sarana Multi Infrastruktur Unit Usaha
         Sindikasi dengan PT Sarana Multi Infrastruktur                                     Syariah and PT Sarana Multi Infrastruktur. Both
         Unit Usaha Syariah dan PT Sarana Multi                                             non-bank financial institutions are providing
         Infrastruktur. Kedua   lembaga      keuangan                                       a credit facility with a credit ceiling
         non bank tersebut memberikan fasilitas kredit                                      of Rp1,293,201,000,000. The facilities are

                                                                           - 116 -
Page 120
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

       maksimum Rp1.293.201.000.000. Fasilitas                        provided for the development of Pasuruan-
       pinjaman ini digunakan Perusahaan untuk dana                   Probolinggo Toll Road.
       operasional pembangunan jalan tol Pasuruan-
       Probolinggo.

       Pinjaman ini dikenakan bunga sebesar 6,25%                     This loan bears interest 6.25% per annum for
       per tahun untuk Tranche A2 dan 10,5%                           Tranche A2 and 10.5% per annum for Tranche
       pertahun untuk Tranche B. Pada November                        B. As of November 2022, there are increased on
       2022, terjadi kenaikan bunga menjadi 13%                       interest rate by 13% for Tranche A2 and for
       untuk Tranche A2 dan untuk Tranche B naik                      Tranche B increased by 11.75% on December
       menjadi 11,75% pada Desember 2022.                             2022.
       Pada tanggal 30 September 2024 dan 31                          As at September 30, 2024 and December 31,
       Desember 2023, saldo pinjaman kredit TJPJT                     2023, the balance of TJPJT credit loan from
       dari PT Sarana Multi Infrastruktur (Persero)                   PT Sarana Multi Infrastruktur (Persero)
       sebesar      Rp1.865.258.575.695        dan                    amounting    to   Rp1,865,258,575,695   and
       Rp1.695.772.353.844.                                           Rp1,695,772,353,844 respectively.
       Pada tanggal 30 September 2024 dan 31                          As at September 30, 2024 and December 31,
       Desember 2023, saldo pinjaman kredit TJPJT                     2023, the balance of TJPJT credit loan from
       kepada PT Sarana Multi Infrastruktur (Persero)-                PT Sarana Multi Infrastruktur (Persero) - Unit
       Unit     Syariah        adalah         sebesar                 Syariah amounting to Rp282,608,152,782 and
       Rp282.608.152.782 dan Rp287.001.025.622.                       Rp287,001,025,622 respectively.

       WBW                                                            WBW
       Berdasarkan akta perjanjian kredit sindikasi                   Based on the syndicated credit agreement deed
       No. 53, tanggal 21 Desember 2018, WBW telah                    No. 53, dated December 21, 2018, WBW
       menandatangani perjanjian Kredit Sindikasi                     entered     into    Loan       Syndication with
       dengan PT Sarana Multi Infrastruktur (Persero)                 PT Sarana Multi Infrastruktur (Persero), and
       dan lembaga keuangan bank lainnya.                             other banking financial institution.
       Sesuai keputusan kreditur sindikasi untuk                      In   accordance      with   the    decision  of
       partisipasi dalam pembiayaan sindikasi WBW                     the syndicated creditors for participation in
       untuk keperluan kredit investasi pembiayaan                    syndicated financing of WBW for credit purposes
       pembangunan dengan limit fasilitas kredit                      development financing investment with an
       investasi sebesar Rp5.360.084.000.000 dengan                   investment      credit    facility   limit   of
       jangka waktu maksimum 180 bulan sejak                          Rp5,360,084,000,000 with a maximum period of
       Penandatangan perjanjian kredit termasuk                       180 months from the signing of the credit
       Grace Period dengan suku bunga masa                            agreement including the Grace Period with
       konstruksi adalah Reference Rate+.                             the construction interest rate is the Reference
                                                                      Rate+.
       Margin eqv 10,50% untuk Tranche 1A dan 1B                     Margin eqv 10,50% untuk Tranche 1A dan 1B
       dan Reference Rate+ Margin eqv 11,50% untuk                   dan Reference Rate+ Margin eqv 11,50% untuk
       Tranche 1C dan 1D.                                            Tranche 1C dan 1D.
       Perjanjian ini telah mengalami perubahan                      The agreement has undergone a change in
       berdasarkan perjanjian kredit sindikasi No. 39                the syndicated credit agreement No. 39 dated
       tanggal 26 Februari 2019 di Jakarta dengan                    February 26, 2019 in Jakarta by agreeing with
       menyepakati dan menyetujui memasukkan                         and agreeing to enter PT Bank Negara Indonesia
       PT Bank Negara Indonesia (Persero) Tbk                        (Persero) Tbk as the new creditor in the credit
       sebagai kreditur baru dalam perjanjian kredit                 agreement and the date of interest payment of
       dan tanggal pembayaran bunga perjanjian                       the credit agreement for facilities of Tranche 1A
       kredit untuk fasilitas Tranche 1A dan fasilitas               and the facilities of Tranche 1B conducted on the
       Tranche 1B dilakukan pada tanggal 25 pada                     25th of each month as well as for facilities of the
       tiap bulan serta untuk fasilitas Tranche 1C dan               Tranche 1C and the Tranche 1D facilitiy on the
       fasilitas Tranche 1D dilakukan pada tanggal 25                25th of each month.
       setiap bulan.

       Berdasarkan     pemberitahuan    pernyataan                   Based on the notice of the statement of
       penundukan diri dari PT Bank Panin Indonesia                  the submission of PT Bank Panin Indonesia Tbk
       Tbk sebagai pemberi tambahan pinjaman                         as an additional lender on August 23, 2019
       tanggal 23 Agustus 2019 perihal pernyataan                    regarding the lender statement to submit to

                                                         - 117 -
Page 121
PT WASKITA KARYA (PERSERO) Tbk                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                   (Expressed in Rupiah, unless otherwise stated)

       pemberi pinjaman untuk tunduk pada seluruh                   the entire agreement document granting
       dokumen      perjanjian   pemberian  fasilitas               the loan facility to debtor with the amount of
       pinjaman kepada debitur dengan jumlah                        additional      loan        facility   given        is
       fasilitas tambahan pinjaman yang diberikan                   Rp750,000,000,000 and will be specifically
       adalah sebesar Rp750.000.000.000 dan secara                  allocated for facilities of Tranche 1A and facilities
       khusus hanya akan dialokasikan untuk fasilitas               of Tranche 1B.
       Tranche 1A dan fasilitas Tranche 1B.

       Berdasarkan       pemberitahuan    pernyataan                Based on the notice of the statement of
       penundukan diri dari PT Bank Pembangunan                     the submission of PT Bank Pembangunan
       Daerah Lampung sebagai pemberi tambahan                      Daerah Lampung as an additional lender on
       pinjaman tanggal 28 Februari 2020 perihal                    February 28, 2020 regarding the lender
       pernyataan       pemberi    pinjaman    untuk                statement to submit to the entire agreement
       tunduk pada seluruh dokumen perjanjian                       document granting the loan facility to debtor with
       pemberian fasilitas pinjaman kepada debitur                  the amount of additional loan facility given is
       dengan jumlah fasilitas tambahan pinjaman                    Rp100,000,000,000 and will be specifically
       yang        diberikan      adalah     sebesar                allocated for facilities for Tranche 1A and
       Rp100.000.000.000 dan secara khusus hanya                    facilities of Tranche 1B.
       akan dialokasikan untuk fasilitas Tranche 1A
       dan fasilitas Tranche 1B.

       Berdasarkan       pemberitahuan    pernyataan                Based on the notice of the statement of
       penundukan diri dari PT Bank ICBC Indonesia                  the submission of PT Bank ICBC Indonesia as
       sebagai pemberi tambahan pinjaman tanggal 8                  an additional lender on April 8, 2020 regarding
       April 2020 perihal pernyataan pemberi pinjaman               the lender statement to submit to the entire
       untuk tunduk pada seluruh dokumen perjanjian                 agreement document granting the loan facility to
       pemberian fasilitas pinjaman kepada debitur                  debtor with the amount of additional loan facility
       dengan jumlah fasilitas tambahan pinjaman                    given is Rp300,000,000,000 and will be
       yang        diberikan      adalah      sebesar               specifically allocated for facilities of Tranche 1A
       Rp300.000.000.000 dan secara khusus hanya                    and facilities of Tranche 1B.
       akan dialokasikan untuk fasilitas Tranche 1A
       dan fasilitas Tranche 1B.

       Pada     tanggal    30 September 2024     dan                As at September 30, 2024 and December 31,
       31 Desember 2023, saldo pinjaman kredit                      2023, the balance of WBW investment credit
       investasi WBW         dari PT Sarana Multi                   loan from PT Sarana Multi        Infrastruktur
       Infrastruktur (Persero) masing-masing sebesar                (Persero)     amounting to Rp922,522,827,094
       Rp922.522.827.094.                                           respectively.

       Pada tanggal 30 September 2024 dan 31                        As at September 30, 2024 and December 31,
       Desember 2023, saldo pinjaman kredit IDC                     2023, the balance of WBW IDC credit loan from
       WBW dari PT Sarana Multi Infrastruktur                       PT Sarana Multi Infrastruktur (Persero)
       (Persero)      masing-masing       sebesar                   amounting     to    Rp425,290,589,256     and
       Rp425.290.589.256 dan Rp303.025.563.890.                     Rp303,025,563,890 respectively.

       WST                                                          WST

       Berdasarkan Akta notaris No. 50 Nanette                      Based on Deed No. 50 of notary Nanette
       Cahyanie, S.H., tanggal 27 Juni 2022 antara                  Cahyanie, S.H., dated June 27, 2022 WST
       WST dengan PT Sarana Multi Infrastruktur                     entered into Financing Agreement with
       (Persero) Tbk perihal Perjanjian Pembiayaan ke               PT Sarana Multi Infrastruktur amounting
       WST sebesar Rp2.900.000.000.000. Pada 7                      Rp2,900,000,000,000. On November 7, 2022.
       November 2022. Pinjaman ini dikenakan bunga                  This loan bears interest at JIBOR + margin with a
       sebesar JIBOR + margin dengan jatuh tempo                    maturity of 15 years. This loan can be used by
       selama 15 tahun, pinjaman ini dapat digunakan                WST for the completion of the KAPB toll road
       oleh WST untuk penyelesaian proyek jalan tol                 project.
       KAPB.

       Fasilitas pembiayaan ini yang telah dibayarkan               This financing facility that has been paid (Non -
       (Non-Revolving). Jangka waktu untuk fasilitas                Revolving). The time period for this financing
       pembiayaan ini adalah 15 Tahun terhitung sejak               facility is 15 years from the signing of
       penandatanganan     Perjanjian     Pembiayaan                the financing agreement including the grace
       termasuk Masa Tenggang.                                      period.

                                                        - 118 -
Page 122
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

       Pada tanggal 30 September 2024 dan 31                              As of September 30, 2024 and December 31,
       Desember 2023, saldo pinjaman kredit WST                           2023, the balance of WST credit loan from
       kepada PT Sarana Multi Infrastruktur (Persero)                     PT Sarana Multi Infrastruktur (Persero)
       masing-masing        adalah           sebesar                      amounting to Rp1,100,000,000,000 respectively.
       Rp1.100.000.000.000.

   -   PBTR                                                         -     PBTR

       Berdasarkan surat persetujuan perubahan                            Based on the approval letter for changes to
       fasilitas kredit sindikasi No. SSK/3.2/4251,                       the syndicated credit facility No. SSK/3.2/4251,
       PBTR menyetujui fasilitas kredit dari PT Sarana                    PBTR approved the credit facilities from
       Multi Infrastruktur Syariah. Fasilitas tersebut                    PT Sarana Multi Infrastruktur Syariah. These
       berupa fasilitas pembayaran kontraktor sebesar                     facilities are in the form      of a     contractor
       Rp352.000.000.000 dan pembayaran Utang                             payment       facility   of Rp352,000,000,000 and
       BLU dan biaya pemliharaan             jalan  tol                   payment        of     BLU Debt     and toll   road
       sebesar Rp148.000.000.000 dengan jangka                            maintenance costs of Rp148,000,000,000 with
       waktu hingga tahun 2038 dan tingkat bagi hasil                     a period of up to 2038 and profit-sharing rate of
       sebesar Reference Rate + Margin.                                   Reference Rate + Margin.

       Berdasarkan surat No. SSK/3.2/4398 atas surat                      Based on letter No. SSK/3.2/4398 on
       keputusan amandemen perjanjian kredit                              the decision letter on the amendment to
       sindikasi PT Sarana Multi Infrastruktur                            the syndicated credit agreement, PT Sarana
       mendapatkan     persetujuan   dari   Kreditur                      Multi Infrastruktur obtained approval from
       Sindikasi pada tanggal 28 Desember 2021                            the Syndicated Creditors on December 28, 2021
       jangka waktu maksimal 18 tahun.                                    for a maximum period of 18 years.

       -   Fasilitas Pembiayaan:                                           -   Financing Facilities:

            Tranche C: pembiayaan baru dari SMI                                Tranche C: new financing from SMI Syariah
            Syariah untuk keperluan pembiayaan                                 for investment purposes with a step-up
            investasi dengan skema bagi hasil step up                          profitsharing scheme and partially deferred.
            dan ditangguhkan sebagian.

       -   Suku Bunga/Bagi Hasil:                                          -   Interest Rate/ Profit Sharing:

            Tranche C (SMI Syariah) Bagi hasil                                 Tranche C (SMI Syariah) Tranche C profit
            Tranche C adalah sebesar Reference Rate                            sharing is equal to Reference Rate + Margin
            + Margin dengan ketentuan sebagai berikut:                         with the following conditions: Reference rate
            Reference rate + margin, dengan                                    + margin, with the following settings:
            pengaturan sebagai berikut:

            a.   Tahun 2021 - 2025: 9,5% per tahun.                            a.   Year 2021 - 2025: 9.5% pa. part of:
                 dibayarkan sebagian sebesar:
                 -   Tahun 2021 - 2024: 5% per tahun;                               -   Year 2021 - 2024: 5% pa;
                 -   Tahun 2024 - 2025: 6,25% per                                   -   Year 2024 - 2025: 6.25% pa.
                     tahun.
                 -   Selisih dari total ekspektasi bagi                             -   The difference from the total
                     hasil yang berlaku dan bagi hasil                                  expected profit sharing and profit
                     yang dibayarkan Sebagian akan                                      sharing      distributed   will  be
                     menjad porsi kewajiban bagi hasil                                  the applicable profit sharing
                     yang ditangguhkan, dan akan                                        obligation and will start in 2027 -
                     dibayarkan mulai tahun 2027 -                                      2031      from      the   date    of
                     2031 sejak tanggal Perjanjian                                      the Financing Agreement according
                     Pembiayaan        sesuai    jadwal                                 to the installment schedule.
                     angsuran
            b.   Tahun 2026 - 2029: 10% per tahun;                             b.   Years 2026 - 2029: 10% pa;
            c.   Tahun 2030: 11,3% per tahun.                                  c.   2030: 11.3% Pa.
                 -   Perjanjian pembiayaan. - Grace                                 -  Grace Period: Tranche C - 6 years
                     Period: Tranche C - 6 tahun sejak                                 from the signing of the financing
                     ditandatangani perjanjian kredit                                  credit agreement until October
                     pembiayaan hingga Oktober 2027;                                   2027.
                 -   Masa Penarikan: Tranche C - 4                                  -  Grace Period: Tranche C - 6 years

                                                          - 119 -
Page 123
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)

                     tahun     sejak    penandatangan                                 from the signing of the financing
                     perjanjian pembiayaan atau sesuai                                credit agreement until October
                     pembayaran utang BLU, dipilih                                    2027.
                     mana yang lebih dahulu terjadi.
                -    Grace Period: Tranche C - 6 tahun                            -   Grace Period: Tranche C - 6 years
                     sejak ditandatangani perjanjian                                  from the signing of the financing
                     kredit pembiayaan hingga Oktober                                 credit agreement until October
                     2027.                                                            2027.
                -    Masa Penarikan: Tranche C - 4                                -   Withdrawal Period: Tranche C - 4
                     tahun     sejak    penandatangan                                 years     from     the        signing
                     perjanjian pembiayaan atau sesuai                                of the financing agreement or
                     pembayaran utang BLU, dipilih                                    according to the payment of BLU
                     mana yang lebih dahulu terjadi.                                  debt, whichever occurs first.

        Pada tanggal 30 September 2024 dan 31                             As at September 30, 2024 and December 31,
        Desember 2023, saldo pinjaman kredit PBTR                         2023, the balance of PBTR credit loan from
        dari PT Sarana Multi Infrastruktur (Persero)                      PT Sarana Multi Infrastruktur (Persero)
        adalah sebesar Rp487.988.663.564 dan                              amounting    to    Rp487,988,663,564   and
        Rp377.534.431.191.                                                Rp377,534,431,191 respectively.

       WSE                                                                WSE

       Pada tanggal 8 Maret 2016, WSE memperoleh                         On March 8, 2016, WSE obtained a long-term
       fasilitas pinjaman berjangka panjang dari                         loan facility from PT Indonesia Infrastructure
       PT Indonesia Infrastructure Finance (IIF)                         Finance (IIF) amounting to Rp175,000,000,000
       sejumlah Rp175.000.000.000 yang terdiri dari                      which consists of Investment Credit facility and
       fasilitas Kredit Investasi (KI) dan Interest During               Interest During Construction (IDC) facility
       Construction (IDC) sebesar Rp10.400.000.000.                      amounting to Rp10,400,000,000.

       Pinjaman ini dibayarkan secara cicilan sampai                     The loan is paid in installments until December
       dengan bulan Desember 2026 dengan masa                            2026 with grace period of 12 months. This senior
       tenggang 12 bulan. Fasilitas pinjaman                             term loan facility was obtained by WSE to finance
       berjangka senior ini diperoleh WSE untuk                          the construction of 2X5 MW mini-hydro power
       pembiayaan proyek pembangunan pembangkit                          plant with interest rate of 9.5% per year. WSE
       listrik tenaga mini hydro 2X5 MW dengan                           appointed PT Bank Negara Indonesia (Persero)
       tingkat bunga per tahun sebesar 9,5%. WSE                         Tbk as a guarantee agent.
       menunjuk PT Bank Negara Indonesia (Persero)
       Tbk sebagai agen jaminan.

       Pinjaman tersebut diatas dijamin dengan                           The loan is collateralized with accounts
       piutang usaha dan aset tetap termasuk fasilitas                   receivable and property and equipment including
       pembangkit listrik tenaga hidro (infrastruktur).                  minihydro         power   generating     facility
                                                                         (infrastructure).

       Perjanjian pinjaman mencakup persyaratan                          The     loan     agreements     include   certain
       tertentu    yang      mengharuskan       WSE                      requirements for WSE to maintain certain
       mempertahankan rasio keuangan tertentu yang                       financial    ratios   calculated     based    on
       dihitung   berdasarkan    laporan    keuangan                     the consolidated financial statements and other
       konsolidasian dan persyaratan lainnya.                            requirements.

       Pada tanggal 30 September 2024 dan 31                             As of September 30, 2024 and December 31,
       Desember 2023, WSE sudah memakai Fasilitas                        2023, the balance of WSE Loan Facilities
       pinjaman tersebut masing-masing sebesar                           amounting     to    Rp80,735,176,710  and
       Rp80.735.176.710 dan Rp88.538.510.782.                            Rp88,538,510,782 respectively.

       PBTR                                                              PBTR

       Berdasarkan      Akta   Notaris     No.     23                    Based on Notarial Deed No.23 dated October 23,
       tanggal 23 Oktober 2019 oleh Ariani Lakhsmijati                   2019 by Ariani Lakhsmijati Rachim S.H., Notary
       Rachim, S.H., Notaris di Jakarta, PBTR dan                        in Jakarta, PBTR and Indonesia Infrastruture
       Indonesia Infrastruture Finance mengadakan                        Finance entered into a Cash Deficiency Support
       perjanjian fasilitas Cash Deficiency Support                      (CDS) facility agreement with a   total credit

                                                             - 120 -
Page 124
PT WASKITA KARYA (PERSERO) Tbk                                                             PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                 FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                           FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                 ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                         AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                  (Expressed in Rupiah, unless otherwise stated)

         (CDS) dengan jumlah fasilitas kredit sebesar                                facility amounting to Rp600,000,000,000. This
         Rp600.000.000.000.       Fasilitas  kredit  ini                             credit facility bears interest of LPS + 6.75% per
         dikenakan bunga sebesar LPS + 6,75% per                                     annum. From the interest rate, the Company is
         tahun. Dari tingkat suku bunga, Perusahaan                                  required to pay 3% per annum from the debit
         wajib membayarkan sebesar 3% per tahun dari                                 balance. The unpaid interest rate is LPS + 3.75%
         baki debet. Adapun tingkat suku bunga yang                                  per annum on the debit balance, payment will be
         belum dibayarkan sebesar LPS + 3,75% per                                    deferred and subject to compound interest at
         tahun atas saldo debet, akan ditangguhkan                                   the interest rate calculated on each interest
         pembayarannya dan dikenakan bunga majemuk                                   payment date until the Syndicated Credit facility
         sebesar tingkat suku bunga yang dihitung pada                               is paid off. In 2020, the Company has drawn
         setiap tanggal pembayaran bunga sampai                                      down the entire facility ceiling amounting to
         dengan fasilitas Kredit Sindikasi lunas. Pada                               Rp600,000,000,000.
         tahun 2020, Perusahaan telah menarik seluruh
         plafon fasilitas sebesar Rp600.000.000.000.

         Pada tanggal 30 September 2024 dan 31                                       As of September 30, 2024 and December 31,
         Desember 2023, saldo pinjaman kredit investasi                              2023, the PBTR investment credit loan balances
         PBTR dari IIF masing masing sebesar                                         from IIF amounting to Rp1,087,116,395,312 and
         Rp1.087.116.395.312                       dan                               Rp1,026,332,972,304 respectively.
         Rp1.026.332.972.304.

27. UTANG BRUTO SUBKONTRAKTOR                                            27. GROSS AMOUNT DUE TO SUBCONTRACTORS

   Utang bruto subkontraktor merupakan utang kerja                              Gross amount due to subcontractors represents
   subkontraktor yang belum diberita acarakan, baik                             payable for uncertified subcontractor’s working
   dari subkontraktor atau material yang diakui sebagai                         progress, either from subcontractor or materials
   prestasi   karena     belum      memenuhi      syarat                        which are recognized as progress but have not
   pembayaran sesuai kontrak.                                                   fulfilled certain payment condition as stated in
                                                                                the contract.

   a.    Utang Bruto Subkontraktor Jangka Pendek                                a.   Short-term   Gross        Amount       Due       to
                                                                                     Subcontractors
   Rincian utang bruto subkontraktor jangka pendek                              The details of short-term gross amount due to
   berdasarkan unit kerja adalah sebagai berikut:                               subcontractors based on business units are as
                                                                                follows:
                                                                                                  30 September/         31 Desember/
                                                                                                September 30, 2024    December 31, 2023
                                                                                                       Rp                    Rp
   Perusahaan/ The Company
    Divisi Operasi I/ Division Operation I - Jakarta                                               552.632.233.767                     --
    Divisi Operasi II/ Division Operation II - Jakarta                                             304.791.395.921                     --
    Divisi Gedung/ Division Building - Jakarta                                                                   --      456.696.569.903
    Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                                --      234.757.986.207
    Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                              --      157.038.221.501
    Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                                  --      149.202.191.216
    Divisi Overseas/ Division Overseas - Jakarta                                                                 --        3.485.272.976
   Sub Jumlah/ Sub-Total                                                                           857.423.629.688     1.001.180.241.803
   Entitas Anak/ Subsidiary
    PT Waskita Beton Precast Tbk                                                                   170.541.963.851       201.746.143.353
    PT Waskita Karya Realty                                                                         32.422.504.363        32.526.744.384
    PT Waskita Karya Infrastruktur                                                                   3.313.824.575         3.040.123.510
   Sub Jumlah/ Sub-Total                                                                           206.278.292.789       237.313.011.247
   Jumlah/ Total                                                                                  1.063.701.922.477    1.238.493.253.050




                                                                      - 121 -
Page 125
PT WASKITA KARYA (PERSERO) Tbk                                                             PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                 FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                           FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                 ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                         AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                  (Expressed in Rupiah, unless otherwise stated)


   b.    Utang Bruto Subkontraktor Jangka Panjang                               b.   Long-term    Gross         Amount        Due      to
                                                                                     Subcontractors

   Rincian utang bruto subkontraktor jangka panjang                             The details of long-term gross amount due to
   adalah sebagai berikut:                                                      subcontractors are as follows:

                                                                                                 30 September/           31 Desember/
                                                                                               September 30, 2024      December 31, 2023
                                                                                                      Rp                      Rp

   Perusahaan/ The Company
    Divisi Operasi I/ Division Operation I - Jakarta                                                134.112.880.894                      --
    Divisi Operasi II/ Division Operation II - Jakarta                                              339.314.038.917                      --
    Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                                 --       242.207.272.912
    Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                               --       103.052.200.565
    Divisi Gedung/ Division Building - Jakarta                                                                    --        51.415.219.794
    Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                                   --        50.541.407.606
    Divisi Luar Negeri/ Division Overseas - Jakarta                                                               --         2.004.015.988
   Jumlah/ Total                                                                               \    473.426.919.811        449.220.116.865



28. UANG MUKA KONTRAK JANGKA PENDEK                                      28. ADVANCES ON SHORT-TERM CONTRACS
   Uang muka kontrak jangka pendek merupakan uang                               Advances on short-term contracts represents
   muka pelaksanaan proyek yang diterima dari                                   advance received from the owners of projects on
   pemberi kerja sesuai kontrak pekerjaan konstruksi                            short-term construction contracts. The advances will
   jangka pendek; uang muka tersebut akan                                       be offset with the progress of work and terms of
   dikompensasikan dengan progres pekerjaan dan                                 payment in accordance with the progress of work.
   termin pembayaran sesuai dengan progres
   lapangan.
   Uang muka pada WKR, entitas anak, merupakan                                  Advances to WKR, a subsidiary, represent advances
   uang muka yang diterima atas hasil penjualan unit                            received from the sale of apartment units.
   apartemen.
   Uang muka pada WBP, entitas anak, merupakan                                  Advances to WBP, a subsidiary, represent advances
   uang muka yang diterima atas pesanan beton                                   received on precast concrete orders from
   precast dari pelanggan.                                                      customers.
   Uang muka pada WKI, entitas anak, merupakan                                  Advances to WKI, a subsidiary, represent advances
   uang muka yang diterima atas hasil penjualan baja.                           received from the sale of steel.
   Rincian uang muka kontrak jangka pendek                                      The details of advances on short-term contracts
   berdasarkan unit kerja adalah sebagai berikut:                               based on business unit are as follows:

                                                                                               30 September/             31 Desember/
                                                                                             September 30, 2024        December 31, 2023
                                                                                                    Rp                        Rp
   Perusahaan/ The Company
    Divisi Operasi I/ Operation I Division - Jakarta                                               198.935.532.542                       --
    Divisi Operasi II/ Operation II Division - Jakarta                                             187.840.076.392                       --
    Divisi Gedung/ Division Building - Jakarta                                                                   --        357.866.918.439
    Divisi Infrastruktur I/ Division Infrastructure I - Jakarta                                                  --             97.274.918
    Divisi Infrastruktur II/ Division Infrastructure II - Jakarta                                                --         31.958.529.486
    Divisi Infrastruktur III/ Division Infrastructure III - Jakarta                                              --         15.104.297.269
   Sub Jumlah/ Sub-Total                                                                           386.775.608.934         405.027.020.112
   Entitas Anak/ Subsidiaries
    PT Waskita Karya Realty                                                                        363.689.381.148         345.765.030.415
    PT Waskita Beton Precast Tbk                                                                   101.169.256.792          77.693.454.704
    PT Waskita Karya Infrastruktur                                                                   2.952.211.316           8.085.405.137
   Sub Jumlah/ Sub-Total                                                                           467.810.849.256         431.543.890.256
   Jumlah/ Total                                                                                   854.586.458.190         836.570.910.368




                                                                      - 122 -
Page 126
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)

   Uang muka kontrak jangka pendek berdasarkan                                        Advances on short-term contracts based                   on the
   pihak - pihak pemberi kerja sebagai berikut:                                       owners of the projects are as follows:


                                                                                                         30 September/           31 Desember/
                                                                                                       September 30, 2024      December 31, 2023
                                                                                                              Rp                      Rp
   Pihak Berelasi/ Related Parties
    PT Trans Jabar Tol                                                                                     169.075.989.099                          --
    PT Patra Jasa                                                                                            7.509.372.975             12.652.378.380
   Sub Jumlah/ Sub-Total                                                                                   176.585.362.074             12.652.378.380
   Pihak Ketiga/ Third Parties
    Kementerian Pekerjaan Umum dan Perumahan Rakyat/
     The Ministry of Public Works and Housing                                                              146.045.521.853           312.437.419.157
    PT Perusahaan Perseroan (Persero) Batam                                                                 30.640.704.955                         --
    Kedutaan Besar India/ Embassy of India                                                                  29.297.206.414                         --
    Tokyu Construction Co Ltd                                                                               11.909.758.761            20.065.685.032
    Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                             460.107.904.133           491.415.427.799
   Sub Jumlah/ Sub-Total                                                                                   678.001.096.116           823.918.531.988
   Jumlah/ Total                                                                                           854.586.458.190           836.570.910.368


29. BIAYA YANG MASIH HARUS DIBAYAR                                             29. ACCRUED EXPENSE

                                                         30 September/               31 Desember/
                                                       September 30, 2024          December 31, 2023
                                                              Rp                          Rp
   Beban Bunga                                             2.500.666.858.247          1.459.724.383.786                                  Interest Expenses
   Beban Bunga Obligasi                                      787.073.009.019            616.388.363.813                          Bond Interest Expenses
   Beban Umum                                                550.180.602.488            706.426.841.050                                 General Expenses
   Beban Pegawai                                              41.688.289.909            102.141.678.925                              Employee Expenses
   Utang Bagi Hasil                                           10.866.732.917             10.866.732.917                           Profit Sharing Payables
   Beban Kantor                                                6.117.430.231             10.129.816.679                                    Office Expenses
   Beban Gedung                                                5.332.778.852              4.439.775.408                                Building Expenses
   Beban Operasional Proyek                                    1.155.902.992              1.405.882.234                      Project Operational Charges
   Lain-lain                                                   1.760.489.222            414.895.840.803                                              Others
   Jumlah                                                  3.904.842.093.877          3.326.419.315.615                                              Total


   Beban bunga merupakan beban bunga pinjaman                                  Interest expense is the loan interest expense that must
   yang masih harus dibayarkan oleh Perusahaan.                                still be paid by the Company.

   Pada tanggal 30 September 2024 dan 31 Desember                              As of September 30, 2024 and December 31, 2023,
   2023, beban bunga obligasi yang masih harus                                 accrued bonds interest expenses represent interest
   dibayar merupakan beban bunga atas obligasi                                 expenses on the Group’s bonds that were not yet paid
   Perusahaan yang belum dibayar sebagai berikut:                              as follows:
   •    Obligasi tahun 2018 Berkelanjutan III Tahap II                         •      Bonds year 2018 Shelf III Phase II Tranche B;
        Seri B;
   •    Obligasi tahun 2018 Berkelanjutan III Tahap III                        •      Bonds year 2018 Shelf III Phase III Tranche B;
        Seri B;
   •    Obligasi tahun 2019 Berkelanjutan III Tahap IV;                        •      Bonds year 2019 Shelf III Phase IV;
   •    Obligasi tahun 2020 Berkelanjutan IV Tahap I;                          •      Bonds year 2020 Shelf IV Phase I;
   •    Obligasi III tahun 2021;                                               •      Bonds III year 2021;
   •    Obligasi IV tahun 2022;                                                •      Bonds IV year 2022;
   •    Obligasi tahun 2019 Berkelanjutan I Tahap I                            •      Bonds      year    2019    Shelf    I   Phase      I
        (Entitas Anak - PT Waskita Beton Precast Tbk);                                (Subsidiaries - PT Waskita Beton Precast Tbk); and
        dan
   •    Obligasi tahun 2019 Berkelanjutan I Tahap II                           •      Bonds     year     2019    Shelf   I    Phase                    II
        (Entitas Anak - PT Waskita Beton Precast Tbk).                                (Subsidiaries - PT Waskita Beton Precast Tbk).

   Beban umum merupakan biaya yang masih harus                                 General expenses are costs that still have to be paid for
   dibayar atas pihak ketiga, utang beban umum belum                           third parties, unpaid general expenses debt, third party
   dibayar, utang beban umum pihak ketiga, utang                               general expenses debt, unpaid general expenses
   retensi beban umum yang belum dibayar dan utang                             retention debt and accrued debt.
   akrual.

                                                                        - 123 -
Page 127
PT WASKITA KARYA (PERSERO) Tbk                                                             PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                 FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                           FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                 ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                         AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                  (Expressed in Rupiah, unless otherwise stated)

   Pada tanggal 30 September 2024 dan 31 Desember                             As of September 30, 2024 and December 31, 2023,
   2023, bagi hasil yang masih harus dibayar                                  accrued profit sharing payables represent profit
   merupakan bagi hasil atas sukuk Perusahaan yang                            sharing on the Company’s sukuk that were not yet
   belum dibayar sebagai berikut:                                             paid as follows:

   •    Sukuk Mudharabah I tahun 2022.                                        •     Sukuk Mudharabah I year 2022.

   Biaya yang masih harus dibayar untuk beban                           Accrued expenses for projects operational charges
   operasional proyek adalah utang kepada pihak                         represent payables to third parties in line with the project
   ketiga sehubungan dengan kegiatan operasional                        operations of the Company are for building expenses,
   proyek Perusahaan, beban gedung, beban kantor,                       office expenses, employee expense and general
   beban pegawai dan beban umum.                                        expenses.

30. SURAT UTANG JANGKA MENENGAH                                        30. MEDIUM TERM NOTES

                                                           30 September/              31 Desember/
                                                         September 30, 2024         December 31, 2023
                                                                Rp                         Rp

   Surat Utang Jangka Menengah                                                                                        Medium Term Notes
    PT Waskita Karya Realty                                   612.945.758.287           570.727.511.026          PT Waskita Karya Realty
    PT Waskita Fim Perkasa Realti                             165.000.000.000           165.000.000.000    PT Waskita Film Perkasa Realty
    Biaya Emisi                                                             --                        --                    Issuance Cost
   Sub-Total                                                  777.945.758.287           735.727.511.026                         Sub-Total
   Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun                                                                    Less: Short-Term
    PT Waskita Karya Realty                                   (85.000.000.000)          (85.000.000.000)         PT Waskita Karya Realty
    PT Waskita Fim Perkasa Realti                            (165.000.000.000)         (165.000.000.000)   PT Waskita Film Perkasa Realty
   Sub-Total                                                 (250.000.000.000)         (250.000.000.000)                        Sub-Total
   Jumlah                                                      527.945.758.287           485.727.511.026                              Total


   PT Waskita Karya Realty (WKR)                                              PT Waskita Karya Realty (WKR)
   Pada tanggal 15 Desember 2023, WKR                                         On December 15, 2023, WKR entered into contract
   menandatangani kontrak perjanjian No. 25 untuk                             agreement No. 25 to issue Medium Term Notes III
   menerbitkan Surat Utang Jangka Menengah                                    Waskita Karya Realty Tahun 2022 with facility
   (Medium Term Notes III Waskita Karya Realty                                amounting to Rp475,000,000,000. This loan facility
   Tahun 2022) dengan fasilitas pinjaman sebesar                              bears 12.1% annual interest rate. This loan facility
   Rp475.000.000.000. Fasilitas pinjaman ini diterbitkan                      will be used for working capital and/or refinancing of
   dengan tingkat bunga 12,1% per tahun. Fasilitas                            debt. The term of this loan facilty is 45 months.
   peminjaman ini digunakan untuk modal kerja dan/
   atau pembayaran kembali utang usaha. Jangka
   waktu fasilitas pinjaman adalah 45 bulan.
   Pada tanggal 8 Juli 2022, WKR menandatangani                               On July 8, 2022, WKR entered into contract
   kontrak perjanjian No. 05 untuk menerbitkan Surat                          agreement No. 05 to issue Medium Term Notes IV
   Utang Jangka Menengah (Medium Term Notes IV                                Waskita Karya Realty Tahun 2022 with facility
   Waskita Karya Realty Tahun 2022) dengan fasilitas                          amounting to Rp85,000,000,000. This loan facility
   pinjaman sebesar Rp85.000.000.000. Fasilitas                               bears 11.41% annual interest rate. This loan facility
   pinjaman ini diterbitkan dengan tingkat bunga                              will be used for working capital and/or refinancing of
   11,41% per tahun. Fasilitas peminjaman ini                                 Medium Term Notes PT Waskita Realty Tahun
   digunakan untuk modal kerja dan/atau pembayaran                            2021. The term of this loan facility is 370 days.
   kembali Medium Term Notes PT Waskita Realty
   Tahun 2021. Jangka waktu fasilitas pinjaman adalah
   370 hari.
   Pada tanggal 4 Juni 2021, WKR menandatangani                               On June 4, 2021, WKR entered into contract
   kontrak perjanjian No. 07 untuk menerbitkan Surat                          agreement No. 07 to issue Medium Term Notes
   Utang Jangka Menengah (MTN) dengan fasilitas                               (MTN) with facility amounting to Rp85,000,000,000.
   pinjaman sebesar Rp85.000.000.000. Fasilitas                               This loan facility bears 10% annual interest rate.
   pinjaman ini diterbitkan dengan tingkat bunga 10%                          This loan facility will be used for working capital
   per tahun. Fasilitas peminjaman ini digunakan untuk                        and/or refinancing of debt.
   modal kerja dan/ atau pembayaran kembali utang
   usaha.


                                                                  - 124 -
Page 128
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)


   Fasilitas ini telah memperoleh persetujuan                        This facility has received approval for an extension
   perpanjangan periode fasilitas dengan jatuh tempo                 of the facility period with a maturity date of August
   28 Agustus 2025.                                                  28, 2025.
   WKR telah menunjuk Wali Amanat sebagai                            WKR engaged Trustees to act as the intermediary
   perantara WKR dengan pemegang MTN. Adapun                         between WKR and MTN holders. The Trustees for
   wali amanat untuk MTN adalah PT Bank                              MTN issuance is PT Bank Pembangunan Daerah
   Pembangunan Daerah Jawa Barat (Persero) Tbk.                      Jawa Barat (Persero) Tbk.
   Pada tanggal 30 September 2024 dan 31 Desember                    As of September 30, 2024 and December 31, 2023,
   2023, surat utang jangka menengah WKR masing                      the WKR Medium Term Notes amounting to
   masing     sebesar     Rp612.945.758.287   dan                    Rp612,945,758,287     dan     Rp570,727,511,026
   Rp570.727.511.026.                                                respectively.
   PT Waskita Fim Perkasa Realti (WFPR)                              PT Waskita Fim Perkasa Realti (WFPR)
   Pada tanggal 8 Juli 2022, WFPR menandatangani                     On July 8, 2022, the Company entered into contract
   kontrak perjanjian No. 07 untuk menerbitkan Surat                 agreement No. 07 to issue Medium Term Notes II
   Utang Jangka Menengah (Medium Term Notes II                       Waskita Fim Perkasa Realti Year 2022 with facility
   Waskita Fim Perkasa Realti Tahun 2022) dengan                     amounting to Rp165,000,000,000. This loan facility
   fasilitas pinjaman sebesar Rp165.000.000.000.                     bears 13.06% annual interest rate.
   Fasilitas pinjaman ini dikenakan tingkat bunga
   tahunan sebesar 13,06%.
   Fasilitas   peminjaman    ini   digunakan      untuk              This loan facility will be used for refinancing
   refinancing Medium Term Notes PT Waskita Fim                      of Medium Term Notes PT Waskita Fim Perkasa
   Perkasa Realti Tahun 2021. Penerbitan Surat Utang                 Realti Year 2021. The term of this loan facilty is 370
   Jangka     menengah     ini    memperoleh       hasil             days. This facility has amendment on August 21,
   pemeringkatan dari. Jangka waktu fasilitas pinjaman               2024 based on Medium Term Notes II Waskita Fim
   adalah 370 hari. Fasilitas ini telah di addendum                  Perkasa Realti Tahun 2022 obtained approval for
   tanggal 21 Agustus 2024 pada perjanjian Medium                    extension of the facility periods with a maturity date
   Term Notes II Waskita Fim Perkasa Realti Tahun                    on August 25, 2025 with interest rate 13.06% per
   2022 yang memperoleh persetujuan perpanjangan                     annum.
   perpanjangan periode fasilitas dengan jatuh tempo
   25 Agustus 2025 dengan tingkat suku bunga
   13,06% per tahun.
   WFPR telah menunjuk Wali Amanat sebagai                           WFPR engaged Trustees to act as the intermediary
   perantara WFPR dengan pemegang MTN. Adapun                        between WFPR and MTN holders. The Trustees for
   wali amanat untuk MTN adalah PT Bank                              MTN issuance is PT Bank Pembangunan Daerah
   Pembangunan Daerah Jawa Barat (Persero) Tbk.                      Jawa Barat (Persero) Tbk.
   Berdasarkan syarat-syarat dan kondisi-kondisi dari                Under the terms and conditions of these long-term
   perjanjian sehubungan dengan kewajiban jangka                     obligation, WKR are subjects to various covenants
   panjang      tersebut,  WKR     harus    mematuhi                 as follow as obtaining debt with new issuance of
   pembatasan antara lain memperoleh pinjaman                        debts with others method which is have senior level
   dengan cara penerbitan utang baru dengan cara                     than MTN before issuance of MTN, guarantee and
   lainnya yang mempunyai batasan lebih tinggi dari                  make expense from assets within 50% from total
   penerbitan MTN sebelum adanya MTN, menjamin                       asset of WKR, issued guarantee of WKR except
   atau membebani aset WKR lebih besar dari 50%                      concerned of WKR and subsidiary operation,
   dari total aset WKR, memberikan jaminan WKR                       mergers and acquisition with others Company which
   kecuali untuk kegiatan usaha dan anak WKR,                        have a bad influence to going concern, change
   melakukan penggabungan, pengambilalihan dengan                    majority composition, sell and disposal of fixed asset
   WKR lain yang mempunyai dampak negatif                            more than 50% from total asset within 1 current year
   terhadap kelangsungan usaha, merubah komposisi                    period, giving another loan to other third parties
   pemegang saham mayoritas, menjual atau                            except regarding to business facility development,
   mengalihkan aset tetap WKR sebanyak lebih dari                    employees loan, and cooperation, changing main
   50% dari total aset dalam 1 tahun periode berjalan,               business activity, and reducing of authorized,
   memberikan pinjaman kepada pihak lain kecuali                     issued, and fully paid capital of WKR.
   berkaitan dengan sehubungan pembangunan
   fasilitas usaha, pinjaman karyawan, dan koperasi,
   mengubah bentuk usaha WKR, dan mengurangi
   modal dasar, ditempatkan dan modal dasar WKR.


                                                           - 125 -
Page 129
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)

   Pada tanggal 30 September 2024 dan 31 Desember                                     As of September 30, 2024 and December 31, 2023,
   2023, surat utang jangka menengah WFPR masing-                                     the WFPR Medium Term Notes amounting to
   masing sebesar Rp165.000.000.000                                                   Rp165,000,000,000 respectively.

31. UTANG OBLIGASI DAN SUKUK MUDHARABAH –                                         31. BOND PAYABLE AND SUKUK MUDHARABAH –
    BERSIH                                                                            NET
                                                           30 September/             31 Desember/
                                                         September 30, 2024        December 31, 2023
                                                                Rp                        Rp
   Nominal                                                   8.858.882.237.771         8.844.766.761.482                                     Face Value
   Biaya Emisi Obligasi                                        (25.688.628.397)          (25.688.628.397)                            Bond Issuance Cost
   Akumulasi Amortisasi                                          11.446.853.805             9.546.800.046                       Accumulated Amortization
   Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun     (1.361.750.000.000)       (4.715.500.000.000)                           Less: Current Maturity
   Bagian Jangka Panjang                                    7.482.890.463.179         4.113.124.933.131                            Non - Current Portion
   Sukuk Mudharabah                                         1.148.100.000.000         1.148.100.000.000                              Sukuk Mudharabah
   Biaya Emisi Sukuk Mudharabah                                (3.336.771.580)           (3.336.771.580)                 Sukuk Mudharabah Issuance Cost
   Akumulasi Amortisasi                                            686.000.126               417.879.050                        Accumulated Amortization
   Sub Jumlah                                               1.145.449.228.546         1.145.181.107.470                                        Sub-Total
   Jumlah                                                  8.628.339.691.725         5.258.306.040.601                                              Total

   Biaya Emisi Obligasi                                         29.025.399.977             29.025.399.977                            Bonds Issuance Cost
   Dikurangi: Akumulasi Amortisasi                            (12.132.853.931)             (9.964.679.096)                 Less: Accumulated Amortization
   Biaya Emisi Obligasi Belum Diamortisasi                     16.892.546.046              19.060.720.881              Unamortized Bond Issuance Costs



   Obligasi  dan                  Sukuk        yang      diterbitkan                  Bonds and Sukuk issued by the Company:
   Perusahaan:
   a.    Berdasarkan Akta Perubahan IV (Keempat)                                      a.      Based on the Deed of Amendment IV (Fourth)
         Perjanjian Perwaliamanatan Obligasi IV Waskita                                       Trusteeship Agreement Deed Shelf Registration
         Karya Tahun 2022 No. 47 pada tanggal 22 April                                        Bond IV Waskita Karya 2022 No. 47 dated April
         2022 yang dibuat di hadapan Notaris Ashoya                                           22, 2022 from Notary Ashoya Ratam, S.H.,
         Ratam, S.H., M.Kn., Perusahaan telah                                                 M.Kn., the Company issued Shelf Registration
         menerbitkan Obligasi IV Waskita Karya Tahun                                          Bond IV Waskita Karya Year 2022 amounting to
         2022 dengan jumlah pokok obligasi sebesar                                            Rp2,127,300,000,000 which consists of two
         Rp2.127.300.000.000 yang dibagi dalam dua                                            tranches:
         seri:
         •      Seri A dengan tingkat bunga tetap 6,65%                                       •     Tranche A with fixed interest rate of 6.65%
                per tahun dengan nilai Rp658.000.000.000.                                           p.a. with face value of Rp658,000,000,000.
         •      Seri B dengan tingkat bunga tetap 7,55%                                       •     Tranche B with fixed interest rate of 7.55%
                per        tahun        dengan        nilai                                         p.a with face value of Rp1,469,300,000,000.
                Rp1.469.300.000.000.
         Utang obligasi ini mensyaratkan Perusahaan                                           The Bonds payable require the Company to
         untuk mempertahankan rasio keuangan sebagai                                          maintain financial ratios as follows:
         berikut:
         •      Current ratio tidak kurang dari 0,5 : 1 (nol                                  •     Current ratio is not less than 0.5 : 1 (zero
                koma lima berbanding satu);                                                         point five is to one);
         •      Debt to Equity a.d interest bearing debt                                      •     Debt to Equity a.d interest bearing debt is
                tidak lebih dari 5 : 1 (lima berbanding satu);                                      no more than 5 : 1 (five is to one); and
         •      Earning Before Interest, Tax, Depreciation                                    •     Earnings Before Interest, Tax, Depreciation
                and Amortization (EBITDA) dengan Beban                                              and Amortization (EBITDA) to Interest
                Bunga Pinjaman tidak kurang dari 0,8 : 1                                            Expense is not less than 0.8 : 1 (zero point
                (nol koma delapan berbanding satu).                                                 eight is to one).
         Obligasi ini dijamin dengan Penjaminan                                               These bonds are guaranteed by Govermnent
         Pemerintah berdasarkan Peraturan Menteri                                             Guarantee based on Regulation of The Minister
         Keuangan            Republik         Indonesia                                       of    Finance    of   Republic     Indonesia
         Nomor 211/PMK.08/2020 tanggal 22 Desember                                            Number 211/PMK.08/2020 dated December 22,
         2020 dan Surat Persetujuan Prinsip Penjaminan                                        2020 and Letter of Approval for Government
         Pemerintah dari Kementerian Keuangan                                                 Guarantee Principles from The Ministry of
         Republik Indonesia Nomor S-159/PR/2022                                               Finance of Republic Indonesia Number
         tanggal 8 April 2022.                                                                S-159/PR/2022 dated April 8, 2022.


                                                                           - 126 -
Page 130
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)


        Pada tanggal 28 April 2022 Perusahaan                               On April 28, 2022, the Company obtained an
        memperoleh pernyataan efektif dari OJK atas                         effective statement from the OJK on
        Atas Pernyataan Pendaftaran Dalam Rangka                            the Registration Statement for the Public
        Penawaran Umum Obligasi IV PT Waskita                               Offering of PT Waskita Karya Bonds IV Year
        Karya Tahun 2022 Dan Penawaran Umum                                 2022 and the Public Offering of Sukuk
        Sukuk Mudharabah I berdasarkan Surat                                Mudharabah I based on Decree No. S-
        Keputusan No. S-75/D.04/2022.                                       75/D.04/2022.

   b.   Berdasarkan Akta Perubahan IV (Keempat)                        b.   Based on the Deed of Amendment IV (Fourth)
        Perjanjian Perwaliamanatan Sukuk Mudharabah                         Trusteeship Agreement Deed Shelf Registration
        I Waskita Karya Tahun 2022 No. 50 pada                              Sukuk Mudharabah I Waskita Karya 2022 No.
        tanggal 22 April 2022 yang dibuat di hadapan                        50 dated April 22, 2022 from Notary Ashoya
        Notaris    Ashoya     Ratam,   S.H.,   M.Kn.,                       Ratam, S.H., M.Kn., the Company issued Shelf
        Perusahaan      telah    menerbitkan    Sukuk                       Registration Sukuk Mudharabah I Waskita
        Mudharabah Waskita Karya Tahun 2022                                 Karya      Year    2022     amounting       to
        dengan        jumlah      pokok       sebesar                       Rp1,148,100,000,000 which consists of two
        Rp1.148.100.000.000 yang dibagi dalam dua                           tranches:
        seri:

        •   Seri A dengan tingkat bagi hasil tetap                          •   Tranche A with profit sharing rate of 6.65%
            6,65%    per    tahun  dengan     nilai                             p.a. with face value of Rp383,000,000,000.
            Rp383.000.000.000.
        •   Seri B dengan tingkat bagi hasil tetap                          •   Tranche B with profit sharing rate of 7.55%
            7,55%    per    tahun  dengan     nilai                             p.a with face value of Rp765,100,000,000.
            Rp765.100.000.000.

        Utang sukuk ini mensyaratkan Perusahaan                             Sukuk payables require the Company to
        untuk    mempertahankan          rasio  keuangan                    maintain financial ratios as follows:
        sebagai berikut:
        • Current ratio tidak kurang dari 0,5 : 1                           •   Current ratio is not less than 0.5 : 1
            (nol koma lima berbanding satu);                                    (zero point five is to one);
        • Debt to Equity a.d interest bearing debt                          •   Debt to Equity a.d interest bearing debt is
            tidak lebih dari 5 : 1 (lima berbanding satu);                      no more than 5 : 1 (five is to one); and
        • Earning Before Interest, Tax, Depreciation                        •   Earnings Before Interest, Tax, Depreciation
            and Amortization (EBITDA) dengan Beban                              and Amortization (EBITDA) to Interest
            Bunga Pinjaman tidak kurang dari 0,8 : 1                            Expense is not less than 0.8 : 1 (zero point
            (nol koma delapan berbanding satu).                                 eight is to one).

        Sukuk ini dijamin dengan Penjaminan                                 These sukuk are guaranteed by Govermnent
        Pemerintah berdasarkan Peraturan Menteri                            Guarantee based on Regulation of The Minister
        Keuangan      Republik   Indonesia   Nomor                          of Finance of Republic Indonesia Number
        211/PMK.08/2020 tanggal 22 Desember 2020                            211/PMK.08/2020 dated December 22, 2020
        dan Surat Persetujuan Prinsip Penjaminan                            and Letter of Approval for Government
        Pemerintah dari Kementerian Keuangan                                Guarantee Principles from the Ministry of
        Republik Indonesia Nomor S-159/PR/2022                              Finance of Republic Indonesia Number S-
        tanggal 8 April 2022. Pada tanggal 28 April                         159/PR/2022 dated April 8, 2022. On April 28,
        2022 Perusahaan memperoleh pernyataan                               2022, the Company obtained an effective
        efektif dari OJK atas Atas Pernyataan                               statement from the OJK on the Registration
        Pendaftaran Dalam Rangka Penawaran Umum                             Statement for the Public Offering of PT Waskita
        Obligasi IV PT Waskita Karya Tahun 2022 dan                         Karya Bonds IV Year 2022 and the Public
        Penawaran Umum Sukuk Mudharabah I                                   Offering of Sukuk Mudharabah I based on
        berdasarkan    Surat   Keputusan   No.   S-                         Decree No. S-75/D.04/2022.
        75/D.04/2022.

   c.   Berdasarkan Akta Perubahan II (Kedua)                          c.   Based on the Deed of Amendment II (Second)
        Perjanjian Perwaliamanatan Obligasi III Waskita                     Trusteeship Agreement Deed Shelf Registration
        Karya Tahun 2021 No. 36 pada tanggal 16                             Bond III Waskita Karya 2021 No. 36 dated
        September 2021 yang dibuat di hadapan Notaris                       September 16, 2021 from Notary Ashoya
        Ashoya Ratam, S.H., M.Kn., Perusahaan telah                         Ratam, S.H., M.Kn., the Company issued Shelf
        menerbitkan Obligasi III Waskita Karya Tahun                        Registration Bond III Waskita Karya Year 2021
        2021 dengan jumlah pokok obligasi sebesar                           amounting to Rp1,773,000,000,000 which
        Rp1.773.000.000.000 yang dibagi dalam dua                           consists of two tranches:

                                                             - 127 -
Page 131
PT WASKITA KARYA (PERSERO) Tbk                                                       PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                   AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                           FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                     FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                           ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                   AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                            (Expressed in Rupiah, unless otherwise stated)

        seri:
        •       Seri A dengan tingkat bunga tetap 6,10%                         •   Tranche A with fixed interest rate of 6.10%
                per tahun dengan nilai Rp722.000.000.000.                           p.a. with face value of Rp722,000,000,000
        •       Seri B dengan tingkat bunga tetap 6,80%                         •   Tranche B with fixed interest rate of 6.80%
                per        tahun        dengan        nilai                         p.a with face value of Rp1,051,000,000,000.
                Rp1.051.000.000.000.

        Utang obligasi ini mensyaratkan Perusahaan                              Bonds payable require the Company to maintain
        untuk mempertahankan rasio keuangan sebagai                             financial ratios as follows:
        berikut:

        •       Current ratio tidak kurang dari 0,5 : 1 (nol                    •   Current ratio is not less than 0.5 : 1 (zero
                koma lima berbanding satu);                                         point five is to one);
        •       Debt to Equity a.d interest bearing debt                        •   Debt to Equity a.d interest bearing debt is
                tidak lebih dari 5 : 1 (lima berbanding satu);                      no more than 5 : 1 (five is to one); and
                dan
        •       Earning Before Interest, Tax, Depreciation                      •   Earnings Before Interest, Tax, Depreciation
                and Amortization (EBITDA) dengan Beban                              and Amortization (EBITDA) to Interest
                Bunga Pinjaman tidak kurang dari 0,8 : 1                            Expense is not less than 0.8 : 1 (zero point
                (nol koma delapan berbanding satu).                                 eight is to one).

        Obligasi ini dijamin dengan Penjaminan                                  These bonds are guaranteed by Govermnent
        Pemerintah berdasarkan Peraturan Menteri                                Guarantee based on Regulation of The Minister
        Keuangan      Republik  Indonesia  Nomor                                of Finance of Republic Indonesia Number
        211/PMK.08/2020 tanggal 22 Desember 2020                                211/PMK.08/202 dated December 22, 2020 and
        dan Surat Persetujuan Prinsip Penjaminan                                Letter of Approval for Government Guarantee
        Pemerintah dari Kementerian Keuangan                                    Principles from the Ministry of Finance of
        Republik Indonesia Nomor S-261/PR/2021                                  Republic Indonesia Number S-261/PR/2021
        tanggal 21 Juni 2021.                                                   dated June 21, 2021.

   d.   Berdasarkan Akta Perubahan VI (Keenam)                             d.   Based on the Deed of Amendment VI (Sixth)
        Perjanjian      Perwaliamanatan        Obligasi                         Trusteeship Agreement Deed Shelf Registration
        Berkelanjutan IV Waskita Karya Tahap I tahun                            Bond IV Waskita Karya Phase I 2020 No. 31 on
        2020 No. 31 pada tanggal 21 Maret 2024 yang                             March 21 2024 made before Notary Dewantari
        dibuat    di   hadapan    Notaris     Dewantari                         Handayani, SH, MPA, the Company has issued
        Handayani, SH, MPA, Perusahaan telah                                    Sustainable Bonds IV Waskita Karya Phase I
        menerbitkan Obligasi Berkelanjutan IV Waskita                           2020    with    a   principal   amount      of
        Karya Tahap I Tahun 2020 dengan jumlah                                  Rp135,500,000,000 with a maturity date of
        pokok obligasi sebesar Rp135.500.000.000                                December 31, 2034 and an interest rate fixed
        tanggal jatuh tempo pada 31 Desember 2034                               5% per year.
        dan tingkat bunga tetap 5% per tahun.

        Utang obligasi ini mensyaratkan Perusahaan                              Bonds payable require the Company to maintain
        untuk mempertahankan rasio keuangan sebagai                             financial ratios as follows:
        berikut:

        Interest Services Coverage Ratio (ISCR) tidak                           Interest Services Coverage Ratio (ISCR) is not
        kurang dari 1 : 1 (satu berbanding satu) yang                           less than 1 : 1 (one to one) which applies from
        berlaku sejak 31 Desember 2027;                                         December 31, 2027;
             Yang dimaksud :                                                         What is meant is :
             − Interest Services Coverage Ratio (ISCR)                               − Interest Services Coverage Ratio (ISCR)
               adalah EBITDA dibagi Bunga Tunai (Cash                                  is EBITDA divided by Cash Interest on an
               Interest) secara tidak terkonsolidasi dari                              unconsolidated basis from the Issuer;
               Emiten;                                                               − EBITDA is profit before tax expense plus
             − EBITDA adalah laba sebelum beban                                        interest costs plus depreciation and
               pajak ditambah biaya bunga ditambah                                     amortization on an unconsolidated basis
               depresiasi dan Amortisasi secara tidak                                  from the Issuer;
               terkonsolidasi dari Emiten;                                           − Cash Interest means cash interest stated
             − Bunga Tunai (Cash Interest) berarti bunga                               in the audited unconsolidated financial
               tunai yang dinyatakan di dalam laporan                                  statements of the Issuer.
               keuangan Emiten tidak terkonsolidasi
               yang diaudit.
                                                                 - 128 -
Page 132
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)


        Berdasarkan hasil pelaksanaan Rapat Umum                            Based on the results of the General Meeting of
        Pemegang Obligasi ("RUPO") atas Obligasi                            Bondholders ("RUPO") on Waskita Karya
        Berkelanjutan IV Waskita Karya Tahap I Tahun                        Sustainable Bonds IV Phase I 2020 in
        2020 sesuai Surat Keterangan Notaris Nomor:                         accordance with Notarial Statement Letter
        26/NOT/SK/WK-RUPO/II/2024       tanggal   22                        Number: 26/NOT/SK/WK-RUPO/II/2024 dated
        Februari 2024 dari Dewantari Handayani, SH,                         February, 22 2024 from Dewantari Handayani,
        MPA, Notaris di Jakarta, bahwa RUPO telah                           SH, MPA, Notary in Jakarta, that the RUPO has
        mengambil keputusan dimana sebanyak                                 taken a decision where 92.38% of bondholders
        92,38% pemegang obligasi menyetujui usulan                          agreed to the proposal with the following main
        dengan poin-poin utama sebagai berikut:                             points:

            1.   Tanggal pelunasan pokok obligasi,                              1.   Bond principal repayment date, for
                 untuk obligasi seri B, jatuh tempo pada                             series B bonds, is due on December
                 tanggal 31 Desember 2034;                                           31, 2034;
            2.   Ketentuan tingkat bunga untuk obligasi                         2.   Interest rate provisions for series B
                 seri B, sejak tanggal berlakunya                                    bonds, from the effective date of the
                 perubahan Perjanjian Perwaliamanatan                                amendment to the Trustee Agreement
                 sampai dengan 31 Desember 2034                                      until 31 December 2034 with a fixed
                 dengan tingkat bunga tetap sebesar 5%                               interest rate of 5% per year;
                 per tahun;
            3.   Ketentuan mengenai jadwal dan                                  3.   Provisions regarding the schedule and
                 periode pembayaran bunga Obligasi,                                  period for Bond interest payments,
                 pembayaran bunga sejak tanggal                                      interest payments from the effective
                 berlakunya     perubahan       Perjanjian                           date of the amendment to the Trustee
                 Perwaliamanatan sampai dengan tahun                                 Agreement until 2034, will be paid in
                 2034, akan dibayarkan secara tunai                                  cash every quarter starting from June
                 setiap triwulan dimulai pada tanggal 23                             23, 2024 to December 31, 2034.
                 Juni 2024 sampai dengan 31
                 Desember 2034.

   e.   Berdasarkan Akta Perjanjian Perwaliamanatan                    e.   Based on the Trusteeship Agreement Deed
        Obligasi Berkelanjutan III Waskita Karya Tahap                      Shelf Registration Bond III Waskita Karya Phase
        IV tahun 2019 No. 53 pada tanggal 26 April                          IV 2019 No. 53 dated April 26, 2019 from Notary
        2019 yang dibuat di hadapan Notaris Fathiah                         Fathiah Helmi, S.H., the Company issued Shelf
        Helmi, S.H., Perusahaan telah menerbitkan                           Registration Bond III Waskita Karya Phase IV
        Obligasi Berkelanjutan III Waskita Karya Tahap                      Year 2019 amounting to Rp1,845,750,000,000
        IV Tahun 2019 dengan jumlah pokok obligasi                          which consists of two tranches:
        sebesar Rp1.845.750.000.000 yang dibagi
        dalam dua seri:

        •   Seri A dengan dengan tingkat bunga tetap                        •   Tranche A with fixed interest rate of 9.00%
            9,00%     per    tahun   dengan     nilai                           p.a. with face value of Rp484,000,000,000
            Rp484.000.000.000 dan sudah dibayar                                 and have been paid in full on May 16, 2022.
            lunas pada 12 Mei 2022.
        •   Seri B dengan dengan tingkat bunga tetap                        •   Tranche B with fixed interest rate of 9.75%
            9,75%     per    tahun   dengan     nilai                           p.a.     with      face        value      of
            Rp1.361.750.000.000.                                                Rp1,361,750,000,000.

        Telah diadakan Rapat Umum Pemegang                                  A General Meeting of Bondholders (RUPO) was
        Obligasi (RUPO) atas Obligasi Berkelanjutan III                     held for the Shelf Registration Bond III Waskita
        Waskita Karya Tahap IV tahun 2019 pada                              Karya Phase IV 2019 on August 8, 2024. Based
        tanggal 8 Agustus 2024. Berdasarkan Surat                           on     Notary's     Statement       Letter  No.
        Keterangan Notaris No. 146/NOT/SK/WK-                               146/NOT/SK/WK-RUPO/VIII/2024 dated August
        RUPO/VIII/2024 tanggal 8 Agustus 2024 bahwa                         8, 2024 that the voting results in this RUPO do
        hasil pemungutan suara dalam RUPO ini tidak                         not meet the provisions as required in
        memenuhi ketentuan sebagaimana yang                                 the Trustee Agreement, so that the RUPO for
        disyaratkan dalam Perjanjian Perwaliamanatan,                       the Shelf Registration Bond III Waskita Karya
        sehingga RUPO atas Obligasi Berkelanjutan III                       Phase IV 2019 does not take any decision.
        Waskita Karya Tahap IV Tahun 2019 ini tidak
        mengambil suatu keputusan.



                                                             - 129 -
Page 133
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


   f.   Berdasarkan Akta Perubahan IV Perjanjian                     f.   Based on Deed of Amendment IV to
        Perwaliamanatan No. 29 pada tanggal 21 Maret                      Trusteeship Agreement No. 29 on March 21,
        2024 yang dibuat di hadapan Notaris Dewantari                     2024 made before Notary Dewantari Handayani,
        Handayani, SH, MPA,, Perusahaan telah                             SH, MPA,, the Company has issued Shelf
        menerbitkan Obligasi Berkelanjutan III Waskita                    Registration Bond III Waskita Karya Phase III
        Karya Tahap III Tahun 2018 dengan jumlah                          2018     with   a     principal   amount     of
        pokok obligasi sebesar Rp1.702.750.000.000                        Rp1,702,750,000,000 divided into two series:
        yang dibagi dalam dua seri:

        •   Seri A dengan tingkat bunga tetap 9,00%                       •   Tranche A with a fixed interest rate of
            per tahun dengan nilai Rp761.000.000.000                          9.00% per annum with a face value of
            dan telah dibayar lunas pada tanggal                              Rp761,000,000,000 and has been paid in
            27 September 2021.                                                full on September 27, 2021.
        •   Seri B dengan tingkat bunga tetap 5% per                      •   Series B with a fixed interest rate of 5% per
            tahun dengan nilai Rp941.750.000.000                              year with a value of Rp941,750,000,000
            dengan tanggal jatuh tempo pada 31                                with a maturity date of 31 December 2034
            Desember 2034 dan tingkat bunga tetap 5%                          and a fixed interest rate of 5% per year.
            per tahun.

        Utang obligasi ini mensyaratkan Perusahaan                        Bonds payable require the Company to maintain
        untuk mempertahankan rasio keuangan sebagai                       financial ratios as follows:
        berikut:

        Interest Services Coverage Ratio (ISCR) tidak                     Interest Services Coverage Ratio (ISCR) is not
        kurang dari 1 : 1 (satu berbanding satu) ) yang                   less than 1 : 1 (one to one) which applies from
        berlaku sejak 31 Desember 2027;                                   December 31, 2027;

            Yang dimaksud :                                                   What is meant is :
            − Interest Services Coverage Ratio (ISCR)                         − Interest Services Coverage Ratio (ISCR)
              adalah EBITDA dibagi Bunga Tunai (Cash                            is EBITDA divided by Cash Interest on an
              Interest) secara tidak terkonsolidasi dari                        unconsolidated basis from the Issuer;
              Emiten;
            − EBITDA adalah laba sebelum beban                                − EBITDA is profit before tax expense plus
              pajak ditambah biaya bunga ditambah                               interest costs plus depreciation and
              depresiasi dan Amortisasi secara tidak                            amortization on an unconsolidated basis
              terkonsolidasi dari Emiten;                                       from the Issuer;
            − Bunga Tunai (Cash Interest) berarti bunga                       − Cash Interest means cash interest stated
              tunai yang dinyatakan di dalam laporan                            in the audited unconsolidated financial
              keuangan Emiten tidak terkonsolidasi                              statements of the Issuer.
              yang diaudit.

        Berdasarkan hasil pelaksanaan Rapat Umum                          Based on the results of the General Meeting of
        Pemegang Obligasi ("RUPO") atas Obligasi                          Bondholders ("RUPO") on Shelf Registration
        Berkelanjutan III Waskita Karya Tahap III seri B                  Bond III Waskita Karya Phase III 2018 in
        Tahun 2018 sesuai Surat Keterangan Notaris                        accordance with Notarial Statement Letter
        Nomor: 24/NOT/SK/WK-RUPO/II/2024 tanggal                          Number: 24/NOT/SK/WK-RUPO/II/2024 dated
        21 Februari 2024 dari Dewantari Handayani,                        February, 21 2024 from Dewantari Handayani,
        SH, MPA, Notaris di Jakarta, bahwa RUPO                           SH, MPA, Notary in Jakarta, that the RUPO has
        telah mengambil keputusan dimana sebanyak                         taken a decision where 77.91% of bondholders
        77,91% pemegang obligasi menyetujui usulan                        agreed to the proposal with the following main
        dengan poin-poin utama sebagai berikut:                           points:

            1.   Tanggal pelunasan pokok obligasi,                            1.   Bond principal repayment date, for
                 untuk obligasi seri B, jatuh tempo pada                           series B bonds, is due on December
                 tanggal 31 Desember 2034;                                         31, 2034;
            2.   Ketentuan tingkat bunga untuk obligasi                       2.   Interest rate provisions for series B
                 seri B, sejak tanggal berlakunya                                  bonds, from the effective date of the
                 perubahan Perjanjian Perwaliamanatan                              amendment to the Trustee Agreement
                 sampai dengan 31 Desember 2034                                    until 31 December 2034 with a fixed
                 dengan tingkat bunga tetap sebesar 5%                             interest rate of 5% per year;
                 per tahun;

                                                           - 130 -
Page 134
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

            3.   Ketentuan mengenai jadwal dan                                 3.   Provisions regarding the schedule and
                 periode pembayaran bunga Obligasi,                                 period for Bond interest payments,
                 pembayaran bunga sejak tanggal                                     interest payments from the effective
                 berlakunya     perubahan      Perjanjian                           date of the amendment to the Trustee
                 Perwaliamanatan sampai dengan tahun                                Agreement until 2034, will be paid in
                 2034, akan dibayarkan secara tunai                                 cash every quarter starting from June
                 setiap triwulan dimulai pada tanggal 23                            23, 2024 to December 31, 2034.
                 Juni 2024 sampai dengan 31
                 Desember 2034.

   g.   Berdasarkan Akta Perubahan II Perjanjian                      g.   Based on Deed of Amendment II to Trusteeship
        Perwaliamanatan No. 34 pada tanggal 21 Maret                       Agreement No. 34 on March 21 2024 which was
        2024 yang dibuat di hadapan Notaris Dewantari                      made before Notary Dewantari Handayani, SH,
        Handayani, SH, MPA,, Notaris di Jakarta.                           MPA,, Notary in Jakarta. The company issued
        Perusahaan menerbitkan Obligasi Berkelanjutan                      Shelf Registration Bond III Waskita Karya Phase
        III Waskita Karya Tahap II Tahun 2018 sebesar                      II 2018 amounting to Rp3,451,500,000,000
        Rp3.451.500.000.000 yang dibagi dalam dua                          which were divided into two series:
        seri:

        •   Seri A dengan tingkat bunga tetap 7,75%                        •   Tranche A with fixed interest rate of 7.75%
            per        tahun       dengan        nilai                         per   annum        with   face    value   of
            Rp1.175.000.000.000. Obligasi ini sudah                            Rp1,175,000,000,000. These bonds have
            dibayar lunas pada tanggal 22 Februari                             been paid in full on February 22, 2021.
            2021.
        •   Seri B dengan tingkat bunga tetap 5% per                       •   Series B with a fixed interest rate of 5% per
            tahun dengan nilai Rp2.276.500.000.000                             year with a value of Rp2,276,500,000,000
            dengan tanggal jatuh tempo pada 31                                 with a maturity date of 31 December 2034
            Desember 2034 dan tingkat bunga tetap 5%                           and a fixed interest rate of 5% per year.
            per tahun.

        Utang obligasi ini mensyaratkan Perusahaan                         Bonds payable require the Company to maintain
        untuk mempertahankan rasio keuangan sebagai                        financial ratios as follows:
        berikut:

        Interest Services Coverage Ratio (ISCR) tidak                      Interest Services Coverage Ratio (ISCR) is not
        kurang dari 1 : 1 (satu berbanding satu) yang                      less than 1 : 1 (one to one) which applies from
        berlaku sejak 31 Desember 2027;                                    December 31, 2027;
             Yang dimaksud :                                                    What is meant is :
             − Interest Services Coverage Ratio (ISCR)                          − Interest Services Coverage Ratio (ISCR)
               adalah EBITDA dibagi Bunga Tunai (Cash                             is EBITDA divided by Cash Interest on an
               Interest) secara tidak terkonsolidasi dari                         unconsolidated basis from the Issuer;
               Emiten;                                                          − EBITDA is profit before tax expense plus
             − EBITDA adalah laba sebelum beban                                   interest costs plus depreciation and
               pajak ditambah biaya bunga ditambah                                amortization on an unconsolidated basis
               depresiasi dan Amortisasi secara tidak                             from the Issuer;
               terkonsolidasi dari Emiten;                                      − Cash Interest means cash interest stated
             − Bunga Tunai (Cash Interest) berarti bunga                          in the audited unconsolidated financial
               tunai yang dinyatakan di dalam laporan                             statements of the Issuer.
               keuangan Emiten tidak terkonsolidasi
               yang diaudit.

        Berdasarkan hasil pelaksanaan Rapat Umum                           Based on the results of the General Meeting of
        Pemegang Obligasi ("RUPO") atas Obligasi                           Bondholders ("RUPO") on Shelf Registration
        Berkelanjutan III Waskita Karya Tahap II seri B                    Bond III Waskita Karya Phase II 2018 in
        Tahun 2018 sesuai Surat Keterangan Notaris                         accordance with Notarial Statement Letter
        Nomor: 27/NOT/SK/WK-RUPO/II/2024 tanggal                           Number: 27/NOT/SK/WK-RUPO/II/2024 dated
        22 Februari 2024 dari Dewantari Handayani,                         February, 22 2024 from Dewantari Handayani ,
        SH, MPA, Notaris di Jakarta, bahwa RUPO                            SH, MPA, Notary in Jakarta, that the RUPO has
        telah mengambil keputusan dimana sebanyak                          taken a decision where 79.19% of bondholders
        79,19% pemegang obligasi menyetujui usulan                         agreed to the proposal with the following main
        dengan poin-poin utama sebagai berikut:                            points:


                                                            - 131 -
Page 135
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

            1.   Tanggal pelunasan pokok obligasi,                             1.   Bond principal repayment date, for
                 untuk obligasi seri B, jatuh tempo pada                            series B bonds, is due on December
                 tanggal 31 Desember 2034;                                          31, 2034;
            2.   Ketentuan tingkat bunga untuk obligasi                        2.   Interest rate provisions for series B
                 seri B, sejak tanggal berlakunya                                   bonds, from the effective date of
                 perubahan Perjanjian Perwaliamanatan                               the amendment to the Trustee
                 sampai dengan 31 Desember 2034                                     Agreement until December 31, 2034
                 dengan tingkat bunga tetap sebesar 5%                              with a fixed interest rate of 5% per year;
                 per tahun;
            3.   Ketentuan mengenai jadwal dan                                 3.   Provisions regarding the schedule and
                 periode pembayaran bunga Obligasi,                                 period for Bond interest payments,
                 pembayaran bunga sejak tanggal                                     interest payments from the effective
                 berlakunya     perubahan       Perjanjian                          date of the amendment to the Trustee
                 Perwaliamanatan sampai dengan tahun                                Agreement until 2034, will be paid in
                 2034, akan dibayarkan secara tunai                                 cash every quarter starting from June
                 setiap triwulan dimulai pada tanggal 23                            23, 2024 to December 31, 2034.
                 Juni 2024 sampai dengan 31
                 Desember 2034.

        Berdasarkan pemeringkatan yang diterbitkan                          Based      on  the    rating   published  by
        oleh PT Pemeringkat Efek Indonesia (Pefindo)                        PT Pemeringkat Efek Indonesia (Pefindo) on
        tanggal 05 April 2024, Peringkat Government                         05 April 2024, the Government Guarantee
        Guarantee untuk Obligasi III Seri A dan B                           Rating for Bonds III Series A dan B 2021 and
        Tahun 2021 dan Obligasi IV Seri A dan Tahun                         Bonds IV Series A dan B 2022 is idAAA(gg);
        2022 adalah idAAA(gg); Peringkat Government                         The Government Guarantee Rating for Sukuk
        Guarantee untuk Sukuk untuk Mudharabah I                            for Mudharabah I Series A dan B in 2022 is
        Seri A dan B Tahun 2022 adalah idAAA(sy)(gg);                       idAAA(sy)(gg); The rating for Sustainable
        Peringkat Obligasi Berkelanjutan III Tahap IV                       Bonds III Phase IV Series B 2019 is idD;
        Seri B Tahun 2019 adalah idD; Peringkat                             The rating for Continuous Bonds III Phase II
        Obligasi Berkelanjutan III Tahap II Seri B Tahun                    Series B 2018, Continuous Bonds III Phase III
        2018, Obligasi Berkelanjutan III Tahap III Seri B                   Series B 2018 and Continuous Bonds IV Phase
        Tahun 2018 dan Obligasi Berkelanjutan IV                            I 2020 is idB.
        Tahap I Tahun 2020 adalah idB.

   Obligasi yang diterbitkan entitas anak - WBP                        Bonds issued by subsidiary - WBP

   Amortisasi diskonto untuk periode yang berakhir                     Amortization of discount for the period ended
   pada 30 September 2024 dan 31 Desember 2023                         September 30, 2024 and December 31, 2023
   masing-masing sebesar Rp35.414.138.827 dan                          amounted         to     Rp35,414,138,827        dan
   Rp13.891.843.090 yang diakui sebagi bagian dari                     Rp13,891,843,090 respectively, which is recognized
   beban keuangan pada laporan laba rugi dan                           as part of finance charges in the statement of profit
   penghasilan komprehensif lain.                                      or loss and other comprehensive income.

   Berdasarkan Akta Notaris No 37 tanggal 29                           Based on Notarial Deed No. 37 dated November 29,
   November 2023 dari Notaris Dewantari Handayani,                     2023 from Notary Dewantari Handayani, SH, MPA,
   SH, MPA, mengenai Perubahan II Perjanjian                           regarding Amendment II of the Trustee Agreement
   Perwaliamanatan Obligasi Wajib Konversi Waskita                     for Compulsory Convertible Bonds of Waskita Beton
   Beton Precast I Tahun 2023, telah ditetapkan                        Precast I Year 2023, it has been determined to
   menjadi OWK dengan syarat-syarat sebagai berikut:                   become OWK with the following conditions:

   1.   Nama OWK: Obligasi Wajib Konversi Waskita                      1.   OWK Name: Waskita Beton Precast Mandatory
        Beton Precast I Tahun 2023.                                         Convertible Bonds I Year 2023.
   2.   Utang pokok OWK: Seluruh nilai Pokok OWK                       2.   OWK principal debt: The entire principal value
        berjumlah Rp457.614.726.667 yang memiliki                           of OWK amounts to Rp457,614,726,667 which
        opsi konversi menjadi saham baru yang                               has a conversion option into new shares issued
        diterbitkan oleh Emiten, dengan satuan                              by the Issuer, with an OWK transfer unit of
        pemindahbukuan OWK adalah senilai Rp1.00                            Rp1,00
   3.   Jatuh Tempo:                                                   3.   Due Date:
        a. Tanggal Konversi OWK menjadi Saham                               a. The date of conversion of OWK into
             Hasil Konversi yaitu pada tahun ke 10 sejak                        Converted Shares is the 10th year from
             tanggal Penerbitan OWK, yaitu pada                                 the date of Issuance of OWK, namely
             tanggal 12 Desember 2033.                                          December 12, 2033.

                                                             - 132 -
Page 136
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

        b.   Jumlah OWK yang akan dikonversi oleh                        b.   The amount of OWK that will be converted
             Emiten pada tanggal Konversi adalah                              by the Issuer on the Conversion date is at
             dengan harga yang sama dengan jumlah                             the same price as the Principal amount of
             Pokok OWK yang tertulis pada Konfirmasi                          OWK written on the Written Confirmation
             Tertulis yang dimiliki oleh Pemegang OWK                         owned by the OWK Holder on the
             pada tanggal Konversi.                                           Conversion date.
        c.   Nilai nominal dari Saham Hasil Konversi                     c.   The nominal value of the Converted Shares
             pada saat Emiten hendak melaksanakan                             when the Issuer wishes to carry out
             konversi atas OWK menjadi Saham Hasil                            the conversion of OWK into Convertible
             Konversi pada Tanggal Konversi, nilai                            Shares on the Conversion Date, the
             nominal dari Saham Hasil Konversi dihitung                       nominal value of the Converted Shares is
             berdasarkan Volume-Weighted Average                              calculated based on the Volume-Weighted
             Price (VWAP) selama 45 (empat puluh                              Average Price (VWAP) for 45 (forty five)
             lima) hari sebelum utang Tranche C telah                         days before the Tranche C debt has
             secara efektif dikonversi menjadi OWK.                           effectively converted to OWK.
        d.   Pelaksanaan Konversi OWK menjadi                            d.   Implementation of OWK Conversion into
             Saham Hasil Konversi.                                            Converted Shares.
   4.   OWK Merupakan Bukti Utang                                   4.   OWK is Proof of Debt
        •    Berdasarkan pernyataan Emiten sekarang                      •    Based on the Issuer's current statement but
             tetapi berlaku sejak Tanggal Penerbitan                          valid from the OWK Issuance Date,
             OWK, OWK merupakan bukti bahwa                                   the OWK is proof that the Issuer legally and
             Emiten secara sah dan mengikat berhutang                         bindingly owes the OWK Holder the amount
             kepada Pemegang OWK sejumlah Pokok                               of OWK Principal stated in the OWK Jumbo
             OWK yang disebut dalam Sertifikat Jumbo                          Certificate plus the Fines (if any) which
             OWK ditambah dengan Denda (jika ada)                             must be paid by the Issuer by converting it
             yang wajib dibayar oleh Emiten dengan                            into Convertible Shares on the Conversion
             cara dikonversi menjadi Saham Hasil                              Date, based on the OWK Trustee
             Konversi     pada    Tanggal    Konversi,                        Agreement      and    Conversion       Agent
             berdasarkan Perjanjian Perwaliamanatan                           Agreement. The OWK is an important part
             OWK dan Perjanjian Agen Konversi. OWK                            and cannot be separated from the OWK
             tersebut merupakan bagian penting dan                            Trusteeship Agreement.
             tidak dapat dipisahkan dari Perjanjian
             Perwaliamanatan OWK.
        •    Bukti kepemilikan OWK bagi Pemegang                         •    Proof of OWK ownership for OWK Holders
             OWK adalah Konfirmasi Tertulis yang                              is  Written    Confirmation    issued by
             diterbitkan oleh Pemegang Rekening dan                           the Account Holder and administered by
             diadministrasikan oleh KSEI berdasarkan                          KSEI based on 43 Securities Account
             43 Perjanjian Pembukaan Rekening Efek                            Opening Agreements signed by the OWK
             yang ditandatangani Pemegang OWK dan                             Holder and the Account Holder.
             Pemegang Rekening.
   5.   Pendaftaran OWK di KSEI                                     5.   OWK registration at KSEI
        •    OWK didaftarkan pada KSEI berdasarkan                       •    OWK is registered with KSEI based on an
             Perjanjian Pendaftaran OWK di KSEI yang                          Agreement Registration of OWK at KSEI
             dibuat di bawah tangan bermeterai cukup,                         which is made under the hand of sufficient
             dengan memperhatikan ketentuan di bidang                         stamp duty, taking into account provisions
             Pasar Modal dan ketentuan KSEI yang                              in the Capital Market sector and applicable
             berlaku.                                                         KSEI provisions.
        •    OWK diterbitkan tanpa warkat kecuali                        •    OWK is issued without script except for
             Sertifikat Jumbo OWK yang diterbitkan                            the Jumbo OWK Certificate which is issued
             untuk didaftarkan atas nama KSEI sebagai                         to be registered in the name of KSEI as
             bukti hutang untuk kepentingan Pemegang                          proof of debt for the benefit of the OWK
             OWK melalui Pemegang Rekening.                                   Holder through the Account Holder.
   6.   Penarikan OWK                                               6.   Withdrawal of OWK
        Penarikan OWK dari Rekening Efek hanya                           Withdrawing OWK from a Securities Account
        dapat dilakukan dengan pemindahbukuan dari                       can only be done by transferring it from one
        satu Rekening Efek ke Rekening Efek lainnya.                     Securities Account to another Securities
                                                                         Account.


                                                          - 133 -
Page 137
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)

   7.   Pengalihan OWK                                                7.   OWK redirection
        Hak kepemilikan OWK beralih dengan                                 OWK ownership rights are transferred by
        pemindahbukuan OWK dari satu Rekening Efek                         transferring OWK from one Securities Account
        ke Rekening Efek lainnya. Emiten, Wali Amanat                      to another Securities Account. The Issuer,
        dan KSEI memberlakukan Pemegang Rekening                           Trustee and KSEI treat the Account Holder as
        selaku Pemegang OWK yang sah dalam                                 the legal OWK Holder in relation to receiving
        hubungannya untuk menerima hak-hak yang                            rights related to the OWK.
        berhubungan dengan OWK.
   8.   Pembelian Kembali                                             8.   Buyback
        Emiten dan/atau suatu pihak ketiga dapat                           The issuer and/or a third party can repurchase
        melakukan pembelian kembali atas OWK, baik                         OWK, either in part or in whole.
        sebagian maupun seluruhnya.

   9.   Minimum Kepemilikan OWK dan/atau Satuan                       9.   Minimum OWK Ownership and/or OWK Trading
        Perdagangan OWK                                                    Unit
        •   Minimum kepemilikan OWK adalah sebesar                         •   Minimum OWK ownership is Rp1 or
            Rp1 atau kelipatannya.                                             multiples thereof.
        •   Sesuai keputusan Rapat Umum Pemegang                           •   In accordance with the decision of
            Obligasi Berkelanjutan I Waskita Beton                             the General Meeting of Sustainable
            Precast Tahap I Tahun 2019 tertanggal 15-                          Bondholders I Waskita Beton Precast
            02-2023, Satuan Perdagangan OWK di                                 Phase I 2019 dated 15-02-2023, OWK
            Bursa Efek dilakukan dengan nilai sebesar                          Trading Units on the Stock Exchange were
            Rp5.000.000        dan/atau      kelipatannya                      carried out with a value of Rp5,000,000
            dan/atau dengan nilai sebesar Rp1                                  and/or multiples thereof and/or with a value
            dan/atau kelipatannya, atau dengan nilai                           of Rp1 and/or multiples thereof, or with a
            sebagaimana ditentukan dalam peraturan                             value as determined in the Stock Exchange
            Bursa Efek dan/ atau perjanjian tersendiri                         regulations and/ or a separate agreement
            yang ditandatangani oleh Emiten dan Bursa                          signed by the Issuer and the Stock
            Efek.                                                              Exchange.
        •   Sesuai peraturan/ ketentuan Bursa Efek                         •   In accordance with the Stock Exchange
            yang berlaku pada saat Perjanjian                                  rules/ conditions in effect at the time this
            Perwaliamanatan OWK ini ditandatangani,                            OWK Trustee Agreement was signed,
            yaitu sesuai Surat Edaran Bursa Efek                               namely in accordance with the Indonesian
            Indonesia Nomor SE-00016/BEI/07-2021                               Stock Exchange Circular Letter Number SE-
            tanggal 12-07-2021 perihal Parameter                               00016/BEI/07-2021       dated    07-12-2021
            Perdagangan Efek Bersifat Utang dan                                regarding Trading Parameters for Debt
            Sukuk di Sistem Penyelenggara Pasar                                Securities and Sukuk in the Alternative
            Alternatif (SPPA), diatur antara lain                              Market      Organizer    System     (SPPA),
            parameter satuan perdagangan di papan                              regulated among other things, trading unit
            retail corporate bonds (retail corps) sebesar                      parameters on the retail corporate bonds
            Rp1.000.000, maka Satuan Perdagangan                               (retail corps) board at Rp1,000,000, then
            OWK di Bursa Efek dilakukan dengan nilai                           the OWK Trading Unit on the Stock
            sebesar         Rp1.000.000          dan/atau                      Exchange is carried out at a value of
            kelipatannya.                                                      Rp1,000,000 and/or multiples thereof.
   10. Jaminan dan Hak Senioritas Atas Utang                          10. Collateral and Seniority Rights on Debt
        OWK tidak dijamin dengan jaminan khusus.                           OWK is not        guaranteed   by   any   special
                                                                           guarantee
   11. Sanksi                                                         11. Punishment

        Apabila Emiten tidak memenuhi kewajiban                            If the Issuer does not fulfill the obligations in
        dalam Perjanjian Perwaliamanatan OWK, maka                         the OWK Trusteeship Agreement, the Issuer
        Emiten dapat dikenakan sanksi sesuai dengan                        may be subject to sanctions in accordance with
        Perjanjian Perwaliamanatan OWK antara lain                         the OWK Trusteeship Agreement, including if
        apabila Emiten tidak melakukan konversi OWK                        the Issuer does not convert the OWK into
        menjadi Saham Hasil Konversi pada Tanggal                          Convertible Shares on the Conversion Date,
        Konversi, maka Emiten wajib membayar denda.                        then the Issuer is obliged to pay a fine.


                                                            - 134 -
Page 138
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

   12. Lain-lain                                                    12. Others
        •   Kewajiban Emiten berdasarkan OWK pada                        •   The Issuer's obligations under the OWK at
            setiap waktu merupakan kewajiban Emiten                          all times constitute the Issuer's legal
            yang sah dan yang tidak bersyarat serta                          obligations and are unconditional and
            bersifat mutlak.                                                 absolute.
        •   Konversi Pokok OWK menjadi Saham Hasil                       •   Conversion of OWK Principal into
            Konversi dan pembayaran denda (jika ada)                         Conversion Shares and payment of fines (if
            merupakan hak dari para Pemegang OWK.                            any) are the rights of OWK Holders.
        •   Bank Kustodian atau Perusahaan Efek                          •   Custodian Banks or Securities Companies
            yang merupakan Pemegang Rekening                                 which are Account Holders can act for
            dapat bertindak untuk dirinya sendiri atau                       themselves or based on a power of attorney
            berdasarkan surat kuasa bertindak untuk                          to act for and on behalf of their customers
            dan atas nama nasabahnya sebagai                                 as OWK Holders.
            Pemegang OWK.
        •   Bagi Pemegang OWK berlaku ketentuan                          •   For OWK Holders, tax provisions apply in
            perpajakan sesuai dengan peraturan                               accordance with the laws and regulations in
            perundang-undangan yang berlaku di                               force in the Republic of Indonesia and if
            Negara Republik Indonesia dan apabila                            the Issuer is required by the laws and
            Emiten     diwajibkan     oleh    peraturan                      regulations in force in the Republic of
            perundang-undangan yang berlaku di                               Indonesia to withhold tax on every payment
            Negara      Republik    Indonesia     untuk                      made by the Issuer to OWK Holders,
            memotong pajak atas setiap pembayaran                            the Issuer through The Payment Agent
            yang dilakukan oleh Emiten kepada                                must withhold the tax and pay it to the
            Pemegang OWK, Emiten melalui Agen                                agency appointed to receive tax payments
            Pembayaran harus memotong pajak                                  and through the Payment Agent will provide
            tersebut dan membayarkannya kepada                               proof of tax withholding to the OWK Holder.
            instansi yang ditunjuk untuk menerima
            pembayaran pajak serta melalui Agen
            Pembayaran akan memberikan bukti
            pemotongan pajak kepada Pemegang
            OWK.
        •   Pembayaran manfaat lain atas OWK (jika                       •   Payment of other benefits for OWK (if any)
            ada) akan dilakukan melalui KSEI                                 will be made through KSEI based on
            berdasarkan instruksi Emiten dengan tetap                        the Issuer's instructions while still taking into
            memperhatikan hasil keputusan RUPO dan                           account the results of the RUPO decision
            ketentuan          dalam         Perjanjian                      and the provisions in this Trustee
            Perwaliamanatan ini.                                             Agreement.

   Berdasarkan Akta Notaris No. 40 tanggal 29                       Based on Notarial Deed No. 40 dated November
   November 2023 dari Notaris Dewantari Handayani,                  29th, 2023 from Notary Dewantari Handayani, S.H.,
   S.H., MPA, mengenai Perubahan II Perjanjian                      MPA, regarding Amendment II to the Waskita Beton
   Perwaliamanatan Obligasi Wajib Konversi Waskita                  Precast 2023 Mandatory Convertible Bond Trustee
   Beton Precast II Tahun 2023, telah ditetapkan                    Agreement II 2023, several OWK conditions have
   menjadi OWK dengan syarat-syarat sebagai berikut:                been stipulated as follows:
   1.   Nama OWK: Obligasi Wajib Konversi Waskita                   1.   OWK name: Waskita Beton Precast                    II
        Beton Precast II Tahun 2023.                                     Mandatory Convertible Bonds for 2023
   2.   Utang Pokok OWK:                                            2.   OWK Principal Debt:
        • Seluruh nilai Pokok OWK berjumlah                              • The entire principal value of OWK is
            Rp1.393.155.194.444 yang memiliki opsi                         Rp1,393,155,194,444       which    has    a
            konversi menjadi saham baru yang                               conversion option into new shares issued
            diterbitkan oleh Emiten. Emiten berhak                         by the Issuer. The issuer has the right to
            untuk mengkonversi OWK menjadi saham                           convert OWK into new shares issued by
            baru yang diterbitkan oleh Emiten dalam                        the Issuer within a period of 10 years from
            jangka waktu 10 tahun sejak Emiten                             the time the Issuer obtains all required
            mendapatkan seluruh persetujuan korporasi                      corporate approvals or from the OWK
            yang dibutuhkan atau sejak Tanggal                             Issuance Date.
            Penerbitan OWK.
        • Satuan pemindahbukuan OWK adalah                               •   The OWK transfer unit is Rp1 or multiples
            senilai Rp1 atau kelipatannya.                                   thereof.


                                                          - 135 -
Page 139
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


   3.   Jatuh Tempo OWK:                                              3.   OWK Due Date:
        a. Tanggal Konversi OWK menjadi Saham                              a. The date of conversion of OWK into
            Hasil Konversi yaitu pada tahun ke 10 sejak                       Converted Shares is the 10th year from
            Tanggal Penerbitan OWK, yaitu pada                                the OWK Issuance Date, namely December
            tanggal 12 Desember 2033, dengan                                  12, 2033, taking into account the provisions
            memperhatikan ketentuan dalam Perjanjian                          in the OWK Trustee Agreement. This is by
            Perwaliamanatan OWK. Hal tersebut                                 taking into account other provisions in
            dengan mengindahkan ketentuan lainnya                             the    OWK      Trusteeship     Agreement,
            dalam Perjanjian Perwaliamanatan OWK,                             especially the provisions of the OWK
            khususnya        ketentuan       Perjanjian                       Trusteeship Agreement.
            Perwaliamanatan OWK.
        b. Jumlah OWK yang akan dikonversi oleh                            b.    The amount of OWK that will be converted
            Emiten pada tanggal Konversi adalah                                  by the Issuer on the Conversion Date is at
            dengan harga yang sama dengan jumlah                                 the same price as the Principal amount of
            Pokok OWK yang tertulis pada Konfirmasi                              OWK written on the Written Confirmation
            Tertulis yang dimiliki oleh Pemegang OWK                             owned     by   the    OWK     Holder    on
            pada Tanggal Konversi.                                               the Conversion Date.
        c. Nilai nominal dari Saham Hasil Konversi                         c.    The nominal value of the Converted Shares
            pada saat Emiten hendak melaksanakan                                 when the Issuer wishes to carry out
            konversi atas OWK menjadi Saham Hasil                                the conversion of OWK into Convertible
            Konversi pada Tanggal Konversi, nilai                                Shares on the Conversion Date, the
            nominal dari Saham Hasil Konversi dihitung                           nominal value of the Converted Shares is
            berdasarkan Volume Weighted Average                                  calculated based on the Volume Weighted
            Price (VWAP) selama 45 hari sebelum                                  Average Price (VWAP) for 45 days before
            utang Tranche C telah secara efektif                                 the Tranche C debt has been effectively
            dikonversi menjadi OWK. Yang dimaksud                                converted become an OWK. What is meant
            dengan VWAP adalah tolak ukur untuk                                  by VWAP is a benchmark for determining
            menentukan harga rata-rata pada saham                                the average price of shares of public
            perusahaan terbuka yang diperdagangkan                               companies traded on the Stock Exchange.
            di Bursa Efek. Berdasarkan metode                                    Based on the Volume-Weighted Average
            perhitungan Volume-Weighted Average                                  Price (VWAP) calculation method for 45
            Price (VWAP) selama 45 hari yang                                     days carried out by the Issuer from 04-11-
            dilakukan oleh Emiten pada tanggal 11-04-                            2023 to 6-23-2023, the Issuer has obtained
            2023 sampai dengan tanggal 23-6-2023,                                a Volume-Weighted Average Price (VWAP)
            Emiten telah mendapatkan harga Volume-                               of Rp50.81.
            Weighted Average Price (VWAP) sebesar
            Rp50,81.

              Sehubungan dengan proses persetujuan                               In connection with the approval process
              dari Menteri Hukum dan Hak Asasi Manusia                           from the Minister of Law and Human Rights
              Republik Indonesia dan pendaftaran dalam                           of the Republic of Indonesia and registration
              Sistem    Administrasi   Badan    Hukum                            in the Legal Entity Administration System of
              Kementerian Hukum dan Hak Asasi                                    the Ministry of Law and Human Rights of
              Manusia      Republik   Indonesia   atas                           the Republic of Indonesia for changes to
              perubahan anggaran dasar Emiten, Emiten                            the Issuer's articles of association,
              akan melakukan pembulatan nilai nominal                            the Issuer will round off the nominal value of
              saham yang akan tercatat dalam anggaran                            shares that will be recorded in the Issuer's
              dasar Emiten sehingga nilai nominal dari                           articles of association so that the value
              Saham Hasil Konversi adalah sebesar                                The nominal value of the Converted Shares
              Rp50.                                                              is Rp50.

        d.     Pelaksanaan Konversi OWK menjadi                            d.    Implementation of OWK Conversion into
               Saham Hasil Konversi                                              Converted Shares
              (i) Emiten berhak untuk mengkonversi                              (i) The Issuer has the right to convert
                   OWK menjadi Saham Hasil Konversi                                  OWK into Convertible Shares on
                   pada Tanggal Konversi, dengan tetap                               the Conversion Date, while still
                   mempertimbangkan      kondisi    dari                             considering the conditions of the Issuer.
                   Emiten.
             (ii) Dalam hal terdapat selisih antara nilai                       (ii)   In the event that there is a difference
                   hasil perhitungan Volume-Weighted                                   between the calculated value of
                   Average Price (VWAP) dengan nilai                                   the Volume-Weighted Average Price
                   nominal Saham Hasil Konversi akibat                                 (VWAP) and the nominal value of
                                                            - 136 -
Page 140
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

                dari pembulatan ke bawah atas nilai                                   the Convertible Shares as a result of
                nominal dari Saham Hasil Konversi,                                    rounding down the nominal value of
                maka Emiten akan mencatatkan selisih                                  the Converted Shares, the Issuer will
                nilai tersebut sebagai agio saham.                                    record the difference in value as share
                Sedangkan, dalam hal terdapat selisih                                 premium. Meanwhile, in the event that
                antara nilai Utang Pokok OWK yang                                     there is a difference between the value
                tidak habis dibagi dengan nilai nominal                               of the OWK Principal Debt which is not
                Volume-Weighted       Average     Price                               divisible by the nominal value of
                (VWAP) dimaksud akan diselesaikan                                     the Volume-Weighted Average Price
                Emiten kepada Pemegang OWK pada                                       (VWAP) in question, the Issuer will
                Tanggal Konversi OWK dengan                                           settle it to the OWK Holder on the OWK
                memperhatikan ketentuan peraturan                                     Conversion Date by taking into account
                perundang-undangan yang berlaku.                                      the provisions of the applicable laws
                                                                                      and regulations.
           (iii) Pelaksanaan konversi OWK menjadi                               (iii) Implementation of the conversion of
                 Saham Hasil Konversi dilakukan oleh                                  OWK          into   Resulting    Shares
                 Agen Konversi yang bertindak atas                                    The conversion is carried out by
                 nama Emiten, dengan memperhatikan                                    the Conversion Agent acting on behalf
                 syarat-syarat dan ketentuan-ketentuan                                of the Issuer, taking into account
                 yang diatur dalam Perjanjian Agen                                    the terms and conditions stipulated in
                 Konversi.                                                            the Conversion Agent Agreement.
           (iv) Pelaksanaan konversi OWK menjadi                                (iv) The conversion of OWK into Converted
                 Saham Hasil Konversi yang dilakukan                                  Shares carried out by the Conversion
                 oleh Agen Konversi dianggap sebagai                                  Agent is considered as repayment/
                 pelunasan/pembayaran jumlah Pokok                                    payment of the Principal amount of
                 OWK oleh Emiten kepada Pemegang                                      OWK by the Issuer to the OWK Holder.
                 OWK. Setelah Saham Hasil Konversi                                    After the Converted Shares are
                 diterima oleh para Pemegang OWK                                      received by the OWK Holders who are
                 yang terdaftar sebagai Pemegang                                      registered as OWK Holders on
                 OWK pada Tanggal Konversi, Emiten                                    the Conversion Date, the Issuer is
                 dibebaskan dari kewajiban untuk                                      released from the obligation to make
                 melakukan pembayaran atas jumlah                                     payment of the Principal amount of
                 Pokok OWK tersebut.                                                  the OWK.
            (v) Pemegang        OWK       dengan       ini                       (v) The OWK Holder hereby declares that
                 menyatakan menerima setiap hasil                                     it has received every result of
                 pelaksanaan konversi OWK menjadi                                     the conversion of OWK into Convertible
                 Saham Hasil Konversi yang dilakukan                                  Shares carried out by the Conversion
                 oleh Agen Konversi dan membebaskan                                   Agent and releases the Trustee from
                 Wali Amanat dari setiap klaim, tuntutan,                             any claims, demands and/ or civil or
                 dan/ atau gugatan perdata maupun                                     criminal suits from any party including
                 pidana dari pihak manapun termasuk                                   but not limited to in connection with
                 namun tidak terbatas sehubungan                                      Article 5 of this.
                 dengan Pasal 5 ini.

   4.    OWK Merupakan Bukti Hutang                                    4.    OWK is proof of debt
        •  Berdasarkan pernyataan Emiten sekarang                           •  Based on the Issuer's current statement but
           tetapi berlaku sejak Tanggal Emisi, OWK                             valid from the Issuance Date, OWK is proof
           merupakan bukti bahwa Emiten secara sah                             that the Issuer legally and bindingly owes
           dan mengikat berhutang kepada Pemegang                              the OWK Holder the amount of OWK
           OWK sejumlah Pokok OWK yang disebut                                 Principal stated in the Jumbo OWK
           dalam Sertifikat Jumbo OWK ditambah                                 Certificate plus the Fines (if any) which
           dengan Denda (jika ada) yang wajib dibayar                          must be paid by the Issuer by converting it
           oleh Emiten dengan cara dikonversi                                  into Shares Conversion Results on
           menjadi Saham Hasil Konversi pada                                   the Conversion Date, based on the OWK
           Tanggal Konversi, berdasarkan Perjanjian                            Trustee Agreement and Conversion Agent
           Perwaliamanatan OWK dan Perjanjian                                  Agreement. The OWK is an important part
           Agen Konversi. OWK tersebut merupakan                               and cannot be separated from the OWK
           bagian penting dan tidak dapat dipisahkan                           Trusteeship Agreement.
           dari Perjanjian Perwaliamanatan OWK.
        •  Bukti kepemilikan OWK bagi Pemegang                              •   Proof of OWK ownership for OWK Holders
           OWK adalah Konfirmasi Tertulis yang                                  is  Written  Confirmation   issued  by
           diterbitkan oleh Pemegang Rekening dan                               the Account Holder and administered by

                                                             - 137 -
Page 141
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

            diadministrasikan oleh KSEI berdasarkan                         KSEI based on the Securities Account
            Perjanjian Pembukaan Rekening Efek yang                         Opening Agreement signed by the OWK
            ditandatangani Pemegang OWK dan                                 Holder and the Account Holder. Written
            Pemegang Rekening. Konfirmasi Tertulis                          Confirmation These cannot be transferred
            tersebut tidak dapat dialihkan atau                             or traded.
            diperdagangkan.

   5.    Pendaftaran OWK di KSEI                                   5.    OWK registration at KSEI
        •   OWK didaftarkan pada KSEI berdasarkan                       •  OWK is registered with KSEI based on
            Perjanjian Pendaftaran OWK di KSEI yang                        the OWK Registration Agreement at KSEI
            dibuat di bawah tangan bermaterai cukup,                       which is made under the hand of sufficient
            dengan memperhatikan ketentuan di bidang                       stamp duty, taking into account provisions
            Pasar Modal dan ketentuan KSEI yang                            in the Capital Market sector and applicable
            berlaku.                                                       KSEI provisions.
        •   OWK diterbitkan tanpa warkat kecuali                        •  OWK is issued without script except for
            Sertifikat Jumbo OWK yang diterbitkan                          the Jumbo OWK Certificate which is issued
            untuk didaftarkan atas nama KSEI sebagai                       to be registered in the name of KSEI as
            bukti hutang untuk kepentingan Pemegang                        proof of debt for the benefit of the OWK
            OWK melalui Pemegang Rekening.                                 Holder through the Account Holder.
   6.   Pendaftaran OWK di KSEI                                    6.   OWK registration at KSEI
        Penarikan OWK dari Rekening Efek hanya                          Withdrawing OWK from a Securities Account
        dapat dilakukan dengan pemindahbukuan dari                      can only be done by transferring it from one
        satu Rekening Efek ke Rekening Efek lainnya.                    Securities Account to another Securities
        Penarikan OWK keluar dari Rekening Efek                         Account.     Withdrawal      of  OWK        from
        untuk dikonversikan menjadi sertifikat OWK                      the Securities Account to be converted into an
        tidak dapat dilakukan, kecuali apabila terjadi                  OWK certificate cannot be carried out, unless
        pembatalan pendaftaran OWK di KSEI atas                         there is cancellation of the OWK registration at
        permintaan Emiten atau Wali Amanat dengan                       KSEI at the request of the Issuer or Trustee,
        memperhatikan peraturan perundang-undangan                      taking into account the applicable laws and
        yang berlaku di Pasar Modal dan keputusan                       regulations in the Capital Market and
        RUPO.                                                           the decision of the RUPO.
   7.   Pengalihan OWK                                             7.   OWK redirection
        Hak kepemilikan OWK beralih dengan                              OWK ownership rights are transferred by
        pemindahbukuan OWK dari satu Rekening Efek                      transferring OWK from one Securities Account
        ke Rekening Efek lainnya. Emiten, Wali Amanat                   to another Securities Account. The Issuer,
        dan KSEI memberlakukan Pemegang Rekening                        Trustee and KSEI treat the Account Holder as
        selaku Pemegang OWK yang sah dalam                              the legal OWK Holder in relation to receiving
        hubungannya untuk menerima hak-hak yang                         rights related to the OWK.
        berhubungan dengan OWK.
   8.   Pembelian Kembali                                          8.   Buyback
        Emiten dan/atau suatu pihak ketiga dapat                        The issuer and/or a third party can repurchase
        melakukan pembelian kembali atas OWK, baik                      OWK, either in part or in whole.
        sebagian maupun seluruhnya.
   9.   Minimum Kepemilikan OWK dan/ atau Satuan                   9.   Minimum OWK        Ownership    and/   or OWK
        Perdagangan OWK                                                 Trading Unit

        Minimum kepemillikan OWK adalah sebesar                         Minimum OWK ownership is Rp1 or multiples
        Rp1 atau kelipatannya.                                          thereof.

        Sesuai keputusan Rapat Umum Pemegang                            In accordance with the decision of the General
        Obligasi Berkelanjutan I Waskita Beton Precast                  Meeting of Sustainable Bondholders I Waskita
        Tahap II Tahun 2019 tertanggal 15-02-2023,                      Beton Precast Phase II 2019 dated 15-02-2023,
        Satuan Perdagangan OWK di Bursa Efek                            the OWK Trading Unit on the Stock Exchange is
        dilakukan dengan nilai sebesar Rp5.000.000                      carried out with a value of Rp5,000,000 and/ or
        dan/ atau kelipatannya dan/atau dengan nilai                    multiples thereof and/or with a value of Rp1 and/
        sebesar Rp1 dan/ atau kelipatannya, atau                        or multiples thereof , or with a value as
        dengan nilai sebagaimana ditentukan dalam                       determined in the Stock Exchange regulations
        peraturan Bursa Efek dan/ atau perjanjian                       and/ or a separate agreement signed by
        tersendiri yang ditandatangani oleh Emiten dan                  the Issuer and the Stock Exchange.
        Bursa Efek.
                                                         - 138 -
Page 142
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)


       Sesuai peraturan/ ketentuan Bursa Efek yang                     In accordance with the Stock Exchange
       berlaku pada saat Perjanjian Perwaliamanatan                    regulations/stipulations in effect at the time this
       OWK ini ditandatangani, yaitu sesuai Surat                      OWK Trusteeship Agreement was signed,
       Edaran Bursa Efek Indonesia Nomor SE-                           namely in accordance with the Indonesian Stock
       00016/BEI/07-2021 tanggal 12-07-2021 perihal                    Exchange Circular Letter Number SE-
       Parameter Perdagangan Efek Bersifat Utang                       00016/BEI/07-2021 dated 07-12-2021 regarding
       dan Sukuk di Sistem Penyelenggara Pasar                         Trading Parameters for Debt Securities and
       Alternatif (SPPA), diatur antara lain parameter                 Sukuk in the Organizer's System Alternative
       satuan perdagangan di papan retail corporate                    Market (SPPA), regulated among other things,
       bonds (retail corps) sebesar Rp1.000.000, maka                  trading unit parameters on the retail corporate
       Satuan Perdagangan OWK di Bursa Efek                            bonds (retail corps) board at Rp1,000,000, then
       dilakukan dengan nilai sebesar Rp1.000.000                      the OWK Trading Unit on the Stock Exchange is
       dan/ atau kelipatannya.                                         carried out with a value of Rp1,000,000 and/ or
                                                                       multiples thereof.

       Apabila    ketentuan     mengenai      satuan                   If the provisions regarding trading units on
       perdagangan di bursa efek ditentukan lain oleh                  the stock exchange are determined differently
       peraturan perundang-undangan dibidang pasar                     by statutory regulations in the capital market
       modal, maka peraturan perundang-undangan                        sector, then the statutory regulations in
       dibidang pasar modal tersebut yang berlaku.                     the capital market sector shall apply. OWK
       Perdagangan OWK dilakukan di Bursa Efek                         trading is carried out on the Stock Exchange
       dengan     syarat-syarat    dan     ketentuan                   with the terms and conditions as specified in
       sebagaimana ditentukan dalam peraturan Bursa                    the Stock Exchange regulations.
       Efek.

   10. Jaminan dan Hak Senioritas Atas Utang                       10. Collateral and Seniority Rights on Debt

       OWK tidak dijamin dengan jaminan khusus,                        OWK is not guaranteed by special guarantees,
       sebagaimana dimaksud dalam Perjanjian                           as intended in the OWK Trustee Agreement.
       Perwaliamanatan OWK. Pemegang OWK tidak                         OWK Holders do not have the right to take
       mempunyai hak untuk didahulukan dan hak                         precedence and the rights of OWK Holders are
       Pemegang OWK adalah paripassu tanpa hak                         paripassu without preferential rights with
       preferen dengan hak-hak kreditur Emiten                         the rights of other Issuer creditors, both those
       lainnya, baik yang ada sekarang maupun yang                     existing now and those that will exist in
       akan ada di kemudian hari, kecuali hak-hak                      the future, except for the rights of the Issuer's
       kreditur Emiten yang dijamin secara khusus                      creditors which are specifically guaranteed by
       dengan kekayaan Emiten baik yang telah ada                      the Issuer's assets either existing or future ones
       maupun yang akan ada sebagaimana                                as determined in the OWK Trusteeship
       ditentukan dalam Perjanjian Perwaliamanatan                     Agreement.
       OWK.

   11. Sanksi                                                      11. Punishment

       Apabila Emiten tidak memenuhi kewajiban                         If the Issuer does not fulfill the obligations in
       dalam Perjanjian Perwaliamanatan OWK maka                       the OWK Trustee Agreement, especially
       Emiten dapat dikenakan sanksi sesuai dengan                     the OWK Trustee Agreement, the Issuer may be
       Perjanjian Perwaliamanatan OWK antara lain                      subject to sanctions in accordance with
       apabila Emiten tidak melakukan konversi OWK                     the OWK Trustee Agreement, including if
       menjadi Saham Hasil Konversi pada Tanggal                       the Issuer does not convert the OWK into
       Konversi, maka Emiten wajib membayar Denda.                     Converted Shares on the Conversion Date, then
       Denda yang dibayar oleh Emiten merupakan                        the Issuer is obliged to pay a Fine. Fines paid by
       hak Pemegang OWK, yang akan diberikan                           the Issuer are the rights of the OWK Holder,
       kepada Pemegang OWK secara proporsional                         which will be given to the OWK Holder
       berdasarkan besarnya OWK yang dimilikinya.                      proportionally based on the size of the OWK
                                                                       they own.

       Lain-lain                                                       Others

       a.   Kewajiban Emiten berdasarkan OWK pada                      a.   The Issuer's obligations under the OWK at
            setiap waktu merupakan kewajiban Emiten                         any time constitute the Issuer's legal
            yang sah dan yang tidak bersyarat serta                         obligations and are unconditional and
            bersifat mutlak.                                                absolute.
                                                         - 139 -
Page 143
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)

        b.    Konversi Pokok OWK menjadi Saham Hasil                                       b.    Conversion of OWK Principal into
              Konversi dan pembayaran Denda (jika ada)                                           Conversion Shares and payment of Fines (if
              merupakan hak dari para Pemegang OWK.                                              any) are the rights of OWK Holders.
        c.    Bank Kustodian atau Perusahaan Efek                                          c.    Custodian Banks or Securities Companies
              yang merupakan Pemegang Rekening                                                   which are Account Holders can act for
              dapat bertindak untuk dirinya sendiri atau                                         themselves or based on a power of attorney
              berdasarkan surat kuasa bertindak untuk                                            to act for and on behalf of their customers
              dan atas nama nasabahnya sebagai                                                   as OWK Holders.
              Pemegang OWK.
        d.    Bank Kustodian atau Perusahaan Efek                                          d.    A Custodian Bank or Securities Company
              yang merupakan Pemegang Rekening                                                   which is an Account Holder can act for itself
              dapat bertindak untuk dirinya sendiri atau                                         or based on a power of attorney to act for
              berdasarkan surat kuasa bertindak untuk                                            and on behalf of its customers as an OWK
              dan atas nama nasabahnya sebagai                                                   Holder. For OWK Holders, tax provisions
              Pemegang OWK. Bagi Pemegang OWK                                                    apply in accordance with the laws and
              berlaku ketentuan perpajakan sesuai                                                regulations in force in the Republic of
              dengan peraturan perundang-undangan                                                Indonesia and if the Issuer is required by
              yang berlaku di Negara Republik Indonesia                                          the laws and regulations in force in
              dan apabila Emiten diwajibkan oleh                                                 the Republic of Indonesia to withhold tax on
              peraturan    perundang-undangan       yang                                         every payment made by the Issuer to OWK
              berlaku di Negara Republik Indonesia untuk                                         Holders, the Issuer through the Agent
              memotong pajak atas setiap pembayaran                                              Payments must withhold the tax and pay it
              yang dilakukan oleh Emiten kepada                                                  to the agency appointed to receive tax
              Pemegang OWK, Emiten melalui Agen                                                  payments and through the Payment Agent
              Pembayaran harus memotong pajak                                                    will provide proof of tax withholding to
              tersebut dan membayarkannya kepada                                                 the OWK Holder.
              instansi yang ditunjuk untuk menerima
              pembayaran pajak serta melalui Agen
              Pembayaran akan memberikan bukti
              pemotongan pajak kepada Pemegang
              OWK.

   Berdasarkan surat dari PT Pefindo nomor RC-                                       Based on a letter from PT Pefindo number RC-
   794/PEF-DIR/IX/2023 tanggal 11 September 2023                                     794/PEF-DIR/IX/2023 dated September 11 2023
   perihal Sertifikat Pemeringkat atas Obligasi dan                                  regarding Rating Certificates for WBP Bonds and
   Obligasi Wajib Konversi WBP, peringkat Obligasi                                   Mandatory Convertible Bonds, ratings of Waskita
   Waskita Beton Precast I Tahun 2022, Obligasi Wajib                                Beton Precast Bonds I of 2022, Waskita Beton
   Konversi Waskita Beton Precast I Tahun 2023 serta,                                Precast Mandatory Convertible Bonds I of 2023 as
   Obligasi Waskita Beton Precast II Tahun 2022 dan                                  well as, Waskita Beton Precast II Bonds of 2022 and
   Obligasi Wajib Konversi Waskita Beton Precast II                                  Waskita Beton Precast II Mandatory Convertible
   Tahun 2023 adalah B (Single B).                                                   Bonds of 2023 are B (Single B).

32. LIABILITAS JANGKA PENDEK LAINNYA                                          32.     OTHER SHORT-TERM LIABILITIES


                                                       30 September/                  31 Desember/
                                                     September 30, 2024             December 31, 2023
                                                            Rp                             Rp

   Utang Pemeliharaan                                    1.038.425.342.252              1.038.425.342.252                                     Land Bailout
   Kementerian Pekerjaan Umum dan Perumahan Rakyat          32.556.096.062              1.293.547.819.357        The Ministry of Public Works and Housing
   Utang Pesangon                                           23.454.364.644                163.521.092.503                       Pension
                                                                                                                                      Saverance
                                                                                                                                         Fund Contribution
                                                                                                                                                Payables
   Jamsostek                                                18.661.188.372                 12.429.289.164                                       Jamsostek
   Lain-lain                                               725.466.973.688                759.700.897.255                                           Others
   Dikurangi: Liabilitas Keuangan                                                                                                  Less: Financial Liability
    Saling Hapus                                        (1.038.425.342.252)            (1.038.425.342.252)                                          Offset
   Jumlah                                                  800.138.622.766              2.229.199.098.279                                             Total



   Liabilitas jangka pendek lainnya - lain-lain                                       Other short-term liabilities - others represent
   merupakan beban akrual denda pajak dan beban                                       accruals for tax penalties and project maintenance
   pemeliharan proyek.                                                                expenses.



                                                                          - 140 -
Page 144
PT WASKITA KARYA (PERSERO) Tbk                                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                     (Expressed in Rupiah, unless otherwise stated)

   Liabilitas jangka   pendek lainnya kepada                                        Other short-term liabilities at the Ministry of Public
   Kementerian Pekerjaan Umum dan Perumahan                                         Works and Public Housing are:
   Rakyat merupakan:

   PBTR                                                                             PBTR
   Berdasarkan Akta Notaris No. 3 tanggal 8 Mei 2013                                Based on Notarial Deed No. 3 dated May 8, 2013 by
   oleh Trie Sulistiowarni, S.H., Notaris di Jakarta,                               Trie Sulistiowarni, S.H., Notary in Jakarta, PBTR
   PBTR     memperoleh      fasilitas  pinjaman  dari                               received loan facility from Ministry of Public Work
   Kementerian Pekerjaan Umum dan Perumahan                                         and Public Housing represented by Badan Layanan
   Rakyat yang diwakili oleh Badan Layanan Umum                                     Umum (“BLU”) - Toll Road Regulatory Agency
   (BLU) Badan Pengatur Jalan Tol Bidang Pendanaan                                  Financing Section of Ministry of Public Work and
   Departemen Pekerjaan Umum dan Perumahan                                          Public Housing used as compensation of land
   Rakyat untuk keperluan uang ganti rugi pembelian                                 acquisition for Pemalang - Batang toll road with
   lahan Jalan Tol Pemalang - Batang dengan nilai                                   maximum loan amounted to Rp180,168,000,000 and
   maksimum pinjaman sebesar Rp180.168.000.000                                      beared interest of LPS + 1% and will be mature at
   dan dikenakan suku bunga sebesar LPS + 1% dan                                    the end of 2018. Up to the date of this audit report,
   akan jatuh tempo pada akhir tahun 2018. Sampai                                   the Company still awaiting a letter from BLU
   dengan tanggal laporan audit, Perusahaan masih                                   regarding the due date of repaymentprincipal which
   menunggu surat dari BLU terkait tanggal jatuh                                    is no later than six months sincethe PBTR received
   tempo pelunasan pokok pinjaman yaitu paling                                      the letter.
   lambat enam bulan sejak surat diterima PBTR.
   TJT                                                                              TJT
   PT TJT telah menerima pinjaman dari Kementerian                                  PT       TJT    has     received  borrowing     from
   Pekerjaan Umum dan Perumahan Rakyat Bidang                                       the Ministry of Public Work and Housing, Financing
   Pendanaan      Kementerian   Pekerjaan    Umum.                                  Section of the Ministry of Public Work. The
   Pinjaman tersebut digunakan sebagai uang ganti                                   borrowing is used as compensation of land
   rugi pembelian tanah Jalan Tol Ciawi - Sukabumi.                                 acquisition for Ciawi - Sukabumi Toll Road. The loan
   Pinjaman ini dikenakan bunga LPS +1% per tahun                                   bears interest at LPS +1% per annum and will due
   dan akan jatuh tempo pada kondisi yang lebih                                     when the land acquisition is completed or the toll
   dahulu dicapai yaitu pada saat lahan selesai atau                                road has been operated, whichever is earlier. In
   jalan tol telah dioperasikan. Pada periode 31                                    the period January 31, 2024, WTR derecognized
   Januari 2024, WTR menghentikan pengakuan aset                                    TJT’s assets and liabilities in the interim
   dan liabilitas TJT dalam laporan keuangan                                        consolidated financial statements as a result of
   konsolidasian interim sebagai akibat kehilangan                                  the loss of control over the entity, so that other
   pengendalian pada entitas, sehingga liabilitas                                   liabilities to Ministry of Public Works and Public
   lainnya ke Kementerian Pekerjaan Umum dan                                        Housing decreased.
   Perumahan Rakyat mengalami penurunan.

33. UTANG BANK JANGKA PANJANG                                                33. LONG-TERM BANK LOANS

                                                                                                   30 September/              31 Desember/
                                                                                                 September 30, 2024        December 31, 2023*)
                                                                                                        Rp                         Rp
   Pihak Berelasi/ Related Parties
     Perusahaan/ The Company
       Perjanjian Restrukturisasi Induk/ Master Restructuring Agreement
          PT Bank Negara Indonesia (Persero) Tbk                                                     7.526.061.992.942          7.517.725.933.299
          PT Bank Mandiri (Persero) Tbk                                                              4.545.236.862.690          4.539.578.255.481
          PT Bank Rakyat Indonesia (Persero) Tbk                                                     2.695.686.687.518          2.695.686.687.518
          PT Bank Syariah Indonesia                                                                  1.999.443.415.894          2.045.177.012.979
       Sindikasi Modal Kerja/ Working Capital Syndication
          PT Bank Mandiri (Persero) Tbk                                                              2.414.895.216.220          2.410.539.080.368
          PT Bank Rakyat Indonesia (Persero) Tbk                                                     1.798.687.779.996          1.798.687.779.996
          PT Bank Negara Indonesia (Persero) Tbk                                                       414.939.574.508            414.939.574.508
     Entitas anak/ Subsidiaries
       WTR Grup/Group
       Non Sindikasi Modal Kerja/ Working Capital Non Syndication
          PT Bank Rakyat Indonesia (Persero) Tbk
            Kredit Investasi/Investment Credit                                                                        --        1.743.695.120.235
            Kredit IDC/IDC Credit                                                                                     --          113.323.922.643
       Sindikasi Modal Kerja/ Working Capital Syndication
          PT Bank Negara Indonesia (Persero) Tbk
            Kredit Investasi/Investment Credit                                                       1.611.169.607.668          1.572.447.081.648
            Kredit IDC/IDC Credit                                                                      120.305.936.059            147.543.390.591



                                                                          - 141 -
Page 145
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)

                                                                                                    30 September/             31 Desember/
                                                                                                  September 30, 2024       December 31, 2023*)
                                                                                                         Rp                        Rp
         PT Bank Rakyat Indonesia (Persero) Tbk
           Kredit Investasi/Investment Credit                                                           194.797.981.207           159.131.671.543
           Kredit IDC/IDC Credit                                                                         20.597.897.222            45.659.312.555
         PT Bank Syariah Indonesia (formerly PT Bank BNI Syariah)
           Kredit Investasi/Investment Credit                                                           191.915.803.041           192.133.321.875
         PT Bank Syariah Indonesia Tbk (formerly PT Bank Mandiri Syariah)
           Kredit Investasi/Investment Credit                                                           722.903.791.551           735.922.152.663
       WKR
       Modal Kerja/ Working Capital
         PT Bank Tabungan Negara (Persero) Tbk                                                        1.073.697.047.800         1.093.454.115.175
       WBP
         PT Bank Rakyat Indonesia (Persero) Tbk                                                          860.243.056.159           863.227.418.096
         PT Bank Syariah Indonesia (formerly PT Bank BRI Syariah)                                        696.053.007.733           698.440.760.706
         PT Bank Negara Indonesia (Persero) Tbk                                                          534.414.334.460           536.267.943.238
         PT Bank Mandiri (Persero) Tbk                                                                   304.295.338.122           305.298.506.454
       Diskonto belum diamortisasi/ Unamortized discount                                             (1.296.476.121.983)       (1.445.551.944.268)
       Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/ Less: Current Maturities                 (5.196.661.911.324)         (625.763.112.076)
     Sub Jumlah/ Sub-Total                                                                           21.232.207.297.483        27.557.563.985.227
   Pihak Ketiga/ Third Parties
     Perusahaan/ The Company
       Perjanjian Restrukturisasi Induk/ Master Restructuring Agreement
          PT Bank BTPN Tbk                                                                            2.276.032.811.377         2.276.032.811.377
          PT Bank Pan Indonesia Tbk                                                                   1.937.854.730.295         1.937.854.730.295
          Bank of China Ltd                                                                           1.140.424.112.008         1.140.424.112.008
          PT Bank Pembangunan Daerah
           Jawa Barat dan Banten Tbk                                                                    998.222.785.772           998.222.785.772
          PT Bank UOB Indonesia                                                                         251.102.529.990           251.102.529.990
          PT Shinhan Bank Indonesia                                                                     238.064.217.020           238.064.217.020
          PT Bank Maybank Indonesia Tbk                                                                 500.000.000.000           500.000.000.000
          PT Bank Permata Tbk                                                                           699.599.183.062           699.599.183.062
          Bank QNB Indonesia                                                                            417.796.279.058           417.796.279.058
          PT Bank KEB Hana Indonesia                                                                    281.805.760.004           281.805.760.004
          PT Bank OCBC NISP Tbk                                                                         281.805.760.004           281.805.760.004
          PT Bank DKI                                                                                   235.000.000.000           235.000.000.000
          PT Bank China Construction Bank Indonesia Tbk                                                 225.444.608.003           225.444.608.003
          PT Bank CTBC Indonesia                                                                        169.083.456.002           169.083.456.002
          PT Bank BNP Paribas Indonesia                                                                 154.781.999.763           154.781.999.763
          PT Bank Resona Perdania Indonesia                                                             167.137.162.274           167.137.162.274
          PT Bank SBI Indonesia                                                                          84.541.728.001            84.541.728.001
       Sindikasi Modal Kerja/ Working Capital Syndication
          PT Bank Pembangunan Daerah
           Jawa Barat dan Banten Tbk                                                                    326.986.119.184           326.986.119.184
          PT Bank Pembangunan Daerah Sumatera Utara                                                     326.986.119.198           326.986.119.198
     Entitas anak/ Subsidiaries
       WTR
       Sindikasi Modal Kerja/ Working Capital Syndication
          WTTR, PBTR, dan/and WBW
          PT CIMB Niaga Tbk - Unit Usaha/ Business Unit Syariah
            Kredit Investasi/Investment Credit                                                          596.956.138.088           504.907.385.495
            Kredit IDC/IDC Credit                                                                                     --           59.016.579.719
          PT Bank Aceh Syariah
            Kredit Investasi/Investment Credit                                                          383.861.415.795           384.266.543.038
          PT Bank Pembangunan Daerah Riau Kepri - Unit Usaha/
            Business Unit Syariah
            Kredit Investasi/Investment Credit                                                           71.979.604.785            72.049.957.940
          PT Bank Bank Pembangunan Daerah DIY - Unit Usaha/
            Business Unit Syariah
            Kredit Investasi/Investment Credit                                                           47.978.949.833            48.033.330.077
          PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk
            - Unit Usaha/ Business Unit Syariah
            Kredit Investasi/Investment Credit                                                           96.172.957.464            97.094.806.289
          PT Bank Pembangunan Daerah Jawa Timur Tbk - Unit Usaha/
            Business Unit Syariah
            Kredit Investasi/Investment Credit                                                           99.505.406.979            84.151.230.915
            Kredit IDC/IDC Credit                                                                                     --            9.836.097.725
          PT Bank Pembangunan Daerah Kalimantan Barat
            Kredit Investasi/Investment Credit                                                          205.777.890.800           170.325.365.599
            Kredit IDC/IDC Credit                                                                        24.602.647.445            48.589.070.884
          PT Bank Kalimantan Selatan - Unit Usaha/ Business Unit Syariah
            Kredit Investasi/Investment Credit                                                           47.986.403.188            48.033.305.290
          PT Bank Pembangunan Daerah Sumatera Utara
            Kredit Investasi/Investment Credit                                                          135.390.081.634           135.547.561.634
            Kredit IDC/IDC Credit                                                                        11.595.188.699            11.595.188.699




                                                                            - 142 -
Page 146
PT WASKITA KARYA (PERSERO) Tbk                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                        (Expressed in Rupiah, unless otherwise stated)

                                                                                                    30 September/               31 Desember/
                                                                                                  September 30, 2024         December 31, 2023*)
                                                                                                         Rp                          Rp
        PT Bank Pembangunan Daerah Jambi
           Kredit Investasi/Investment Credit                                                            135.390.081.634              135.547.561.634
           Kredit IDC/IDC Credit                                                                          23.466.978.373               20.897.605.642
        PT Bank Pembangunan Daerah Bengkulu
           Kredit Investasi/Investment Credit                                                            104.835.565.389                80.909.003.845
           Kredit IDC/IDC Credit                                                                          10.326.877.943                28.886.740.768
        PT Bank Pembangunan Daerah Lampung
           Kredit Investasi/Investment Credit                                                            138.864.851.124                81.950.321.874
           Kredit IDC/IDC Credit                                                                           4.193.143.516                56.040.521.388
        PT Bank Pembangunan Daerah DIY
           Kredit Investasi/Investment Credit                                                             45.130.027.211                45.182.520.545
             Kredit IDC                                                                                    7.822.326.129                 6.965.868.552
        PT Bank Pembangunan Daerah Bali
           Kredit Investasi/Investment Credit                                                            208.584.318.074              148.682.293.049
             Kredit IDC                                                                                   22.060.858.742               75.390.238.681
        PT Bank Pembangunan Daerah Kalimantan Tengah
           Kredit Investasi/Investment Credit                                                            135.390.081.634              135.547.561.634
           Kredit IDC/IDC Credit                                                                          23.466.978.373               20.897.605.642
        PT Bank Pembangunan Daerah Kalimantan Selatan
           Kredit Investasi/Investment Credit                                                            233.332.786.562              216.456.565.479
           Kredit IDC/IDC Credit                                                                          33.793.856.316               42.891.485.949
        PT Bank Pembangunan Daerah Sulawesi Tengah
           Kredit Investasi/Investment Credit                                                             45.130.027.211                45.182.520.545
           Kredit IDC/IDC Credit                                                                           7.822.326.129                 6.965.868.552
        PT Bank Pembangunan Daerah Sulawesi Selatan dan Sulawesi Barat
           Kredit Investasi/Investment Credit                                                             67.694.549.204                67.773.289.204
           Kredit IDC/IDC Credit                                                                          11.733.980.799                10.449.294.432
        PT Bank Pembangunan Daerah Sumatera Selatan dan Bangka Belitung
           Kredit Investasi/Investment Credit                                                            368.623.096.832              340.700.609.572
           Kredit IDC/IDC Credit                                                                          39.177.012.075               55.831.340.485
        PT Bank Pembangunan Daerah Riau dan Kepulauan Riau
           Kredit Investasi/Investment Credit                                                            353.532.084.438              331.064.627.037
           Kredit IDC/IDC Credit                                                                          35.845.224.431               49.949.342.204
        PT Bank Pembangunan Daerah Papua
           Kredit Investasi/Investment Credit                                                            506.647.544.758              491.803.888.476
           Kredit IDC/IDC Credit                                                                          82.703.170.440               84.578.131.030
        PT Bank Pembangunan Daerah Maluku dan Maluku Utara
           Kredit Investasi/Investment Credit                                                            120.740.816.221              100.538.090.765
           Kredit IDC/IDC Credit                                                                          15.852.066.771               31.522.362.209
        PT Bank Pembangunan Daerah Nusa Tenggara Timur
           Kredit Investasi/Investment Credit                                                            198.649.134.438              167.550.315.347
           Kredit IDC/IDC Credit                                                                          19.223.375.256               39.335.748.032
        PT Bank Pembangunan Daerah Jawa Timur Tbk
           Kredit Investasi/Investment Credit                                                            809.020.645.229              719.716.519.296
           Kredit IDC/IDC Credit                                                                          83.070.739.068              132.660.715.583
        PT Bank Nagari
           Kredit Investasi/Investment Credit                                                            180.519.125.619              180.729.098.952
           Kredit IDC/IDC Credit                                                                          15.461.234.826               15.461.234.826
        PT Bank Pan Indonesia Tbk
           Kredit Investasi/Investment Credit                                                          1.035.640.796.059              955.201.946.088
           Kredit IDC/IDC Credit                                                                          67.040.022.471              108.498.901.844
        PT Bank ICBC Indonesia
           Kredit Investasi/Investment Credit                                                            208.335.114.996              181.486.954.332
           Kredit IDC/IDC Credit                                                                           4.935.591.611               20.817.960.026
        PT Bank Artha Graha International Tbk
           Kredit Investasi/Investment Credit                                                            135.390.081.634              135.547.561.634
           Kredit IDC/IDC Credit                                                                          23.466.978.372               20.897.605.641
        PT Bank Pembangunan Daerah Jawa Tengah
           Kredit Investasi/Investment Credit                                                            225.650.136.057              225.912.602.723
           Kredit IDC/IDC Credit                                                                          19.325.314.499               19.325.314.499
        PT Bank Mega Syariah
           Kredit investasi                                                                               96.387.172.211                98.122.953.689
       WKR
        PT J Trust Bank                                                                                   60.647.177.367                60.937.500.000
       WKI
        Kredit Investasi/Investment Credit
         PT Bank Pembangunan Daerah Jawa Barat dan Banten Tbk                                           105.253.239.022               108.927.609.265
       WBP
         PT Bank Tabungan Pensiunan Nasional Tbk                                                         612.130.002.434               614.149.511.847
         PT Bank Permata Tbk                                                                             458.524.885.363               459.997.319.257
         PT Bank CTBC Indonesia                                                                          324.600.056.710               325.656.250.000
         PT Bank DKI                                                                                     118.434.185.683               118.434.185.683
         PT BCA Syariah                                                                                  110.648.849.003               111.019.443.140
         PT Bank ICBC Indonesia                                                                           81.001.462.855                81.273.937.783
       Diskonto belum diamortisasi/ Unamortized discount                                               (894.778.170.596)           (1.044.647.354.547)
       Dikurangi: Bagian yang Jatuh Tempo dalam Satu Tahun/ Less: Current Maturities                   (888.565.986.809)             (469.962.021.053)
     Sub Jumlah/ Sub Total                                                                            18.426.647.839.432           18.485.772.857.399
   Jumlah                                                                                             39.658.855.136.915           46.043.336.842.626

   *) Direklasifikasi kembali pada Catatan 61                                                                              *) As reclassified in Note 61



                                                                            - 143 -
Page 147
PT WASKITA KARYA (PERSERO) Tbk                                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                       (Expressed in Rupiah, unless otherwise stated)


   Suku bunga kontraktual per tahun sebagai berikut:                                Contractual interest rate per annum are as follow:

                                                                                                     30 September/            31 Desember/
                                                                                                   September 30, 2024       December 31, 2023

   Perusahaan/ The Company
     PT Bank Negara Indonesia (Persero) Tbk                                                              5,50%                   5,50%
     PT Bank Rakyat Indonesia (Persero) Tbk                                                              5,50%                   5,50%
     PT Bank Mandiri (Persero) Tbk                                                                       5,50%                   5,50%
     PT Bank Pan Indonesia Tbk                                                                           5,50%                   5,50%
     PT Bank BTPN Tbk                                                                                    5,50%                   5,50%
     PT Bank UOB Indonesia                                                                               5,50%                   5,50%
     PT Bank DKI                                                                                         5,50%                   5,50%
     PT Bank Syariah Indonesia Tbk (d/h/ formerly PT Bank Syariah Mandiri,
     PT Bank BNI Syariah, dan PT Bank BRIsyariah Tbk)                                                    5,50%                   5,50%
     PT Bank BNP Paribas Indonesia                                                                       5,50%                   5,50%
     PT Bank Pembangunan Daerah
       Jawa Barat dan Banten Tbk                                                                         5,50%                   5,50%
     PT Bank Maybank Indonesia Tbk                                                                       5,50%                   5,50%
     PT Bank BTPN Tbk,
       Bank of China (Hong Kong) Limited Jakarta Branch, PT Bank KEB Hana Indonesia,
       PT Bank Permata Tbk., PT Bank OCBC NISP Tbk., PT Bank China Construction Bank
       Indonesia Tbk., PT Bank CTBC Indonesia, PT Bank Shinhan Indonesia, dan
       PT Bank SBI Indonesia                                                                             5,50%                   5,50%
     Bank of China Ltd                                                                                   5,50%                   5,50%
     PT Bank BTPN Tbk,
       PT Bank Permata Tbk., PT Bank Shinhan Indonesia, dan PT Bank Resona Perdania                      5,50%                   5,50%
     PT Bank Mandiri (Persero) Tbk,
       PT Bank Negara Indonesia (Persero) Tbk, PT Bank Rakyat Indonesia (Persero) Tbk, PT
       Bank Pembangunan Daerah Jawa Barat dan Banten Tbk dan PT Bank Pembangunan                         8,79%                   8,34%
       Daerah Sumatera Utara
   Entitas anak/ Subsidiary Entity - WBP
     PT Bank Permata Tbk                                                                                 2,00%                   2,00%
     PT Bank Mandiri (Persero) Tbk                                                                       2,00%                   2,00%
     PT Bank ICBC Indonesia                                                                              2,00%                   2,00%
     PT Bank CTBC Indonesia                                                                              2,00%                   2,00%
     PT Bank Negara Indonesia (Persero) Tbk                                                              2,00%                   2,00%
     PT Bank BCA Syariah                                                                                 2,00%                   2,00%
     PT Bank Rakyat Indonesia (Persero) Tbk                                                              2,00%                   2,00%
     PT Bank Syariah Indonesia
         (d/h/ formerly PT Bank BRI Syariah dan PT Bank BNI Syariah)                                     2,00%                   2,00%
     PT Bank BTPN Tbk                                                                                    2,00%                   2,00%



   Perjanjian Restrukturisasi                                                       Restructuring Agreement

   Perusahaan                                                                       The Company

   Pihak Berelasi                                                                   Related Parties

   1.   Perjanjian Restrukturisasi Induk                                            1.      Master Restructuring Agreement

        Berdasarkan Akta Notaris Ashoya Ratam S.H.,                                         Based on the Notary Deed of Ashoya Ratam
        M.Kn, No. 40 tanggal 25 Agustus 2021,                                               S.H., M.Kn, No. 40 dated August 25, 2021,
        Perusahaan menandatangani perjanjian dengan                                         the Company signed agreements with PT Bank
        PT       Bank       Mandiri     (Persero)    Tbk,                                   Mandiri (Persero) Tbk, PT Bank Rakyat
        PT Bank Rakyat Indonesia (Persero) Tbk,                                             Indonesia (Persero) Tbk, PT Bank Negara
        PT Bank Negara Indonesia (Persero) Tbk,                                             Indonesia (Persero) Tbk, PT Bank DKI,
        PT Bank DKI, PT Bank Pembangunan Daerah                                             PT Bank Pembangunan Daerah Jawa Barat and
        Jawa Barat dan Banten Tbk, PT Bank Syariah                                          Banten Tbk, PT Bank Syariah Indonesia Tbk
        Indonesia Tbk dan PT Bank BTPN Tbk untuk                                            and PT Bank BTPN Tbk to restructure
        merestrukturisasi       kewajiban    Perusahaan.                                    the Company's obligations. The Bank's parties
        Pihak-pihak        Bank     setuju     melakukan                                    agreed to restructure the Company's payment
        restrukturisasi      atas     kewajiban-kewajiban                                   liabilities in relation to the financing facilities
        pembayaran Perusahaan sehubungan dengan                                             provided by the banks with total amount of
        fasilitas-fasilitas pembiayaan yang diberikan                                       Rp29,252,309,664,899. The restructuring of
        oleh pihak-pihak         bank dengan       jumlah                                   the Company's liabilities was divided into 2
        keseluruhan sebesar Rp29.252.309.664.899.                                           (two) Tranches, namely:
        Restrukturisasi kewajiban Perusahaan tersebut
                                                                         - 144 -
Page 148
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

       dibagi menjadi 2 (dua) Tranches, yaitu:
       a. Fasilitas Kredit                                               a.   Credit Facility
            -    Fasilitas    Kredit      Tranche      A                      -   Tranche A credit facility amounting to
                 sebesar          Rp13.422.237.848.046,                           Rp13,422,237,848,046, with a fixed
                 dengan sebesar 5,5% dan fixed rate                               rate of 5.5% and a fixed rate of 8% for
                 8% untuk fasilitas Tranche Revolving A;                          the Tranche Revolving A facility;
            -    Fasilitas    Kredit      Tranche      B                      -   Tranche B credit facility amounting to
                 sebesar          Rp13.616.139.687.859,                           Rp13,616,139,687,859, with a fixed
                 dengan fixed rate sebesar 5,5%.                                  rate of 5.5%.
       b.   Fasilitas Pembiayaan Syariah                                 b.   Sharia Financing Facilities
            -    Fasilitas Pembiayaan Syariah Tranche                         -   Tranche A Sharia Financing Facility
                 A sebesar Rp307.100.787.816;                                     amounting to Rp307,100,787,816;
            -    Fasilitas Pembiayaan Syariah Tranche                         -   Tranche B Sharia Financing Facility
                 B sebesar Rp1.906.831.341.177.                                   amounting to Rp1,906,831,341,177.
       Jatuh tempo pembayaran pinjaman pada                              The maturity date of the loan payment is on
       tanggal 31 Desember 2026. Terdapat opsi                           December 31, 2026. There is an option to
       perpanjangan waktu pada fasilitas kredit                          extend the term of the Tranche B2 credit facility
       Tranche B2 paling lama sampai tanggal 31                          up to December 31, 2031. The collateral for
       Desember 2031. Jaminan atas masing-masing                         each of these credit facilities is still subject to
       fasilitas kredit ini tetap tunduk pada dokumen-                   the collateral documents that have been made
       dokumen jaminan yang telah dibuat dan                             and signed or to be made and signed by
       ditandatangani atau yang akan dibuat dan                          the Parties.
       ditandatangi para Pihak.
       Perusahaan diwajibkan mempertahankan rasio                        Companies are required to maintain financial
       keuangan sebagai berikut: Current ratio minimal                   ratios as follows: Current ratio of at least 1 (one)
       1 (satu) kali, Interest Service Coverage Ratio                    time, interest service coverage ratio of at least
       (ISCR) minimal 1,0 kali yang berlaku per                          1.0 time applicable per financial report
       laporan keungan 31 Desember 2023, Interest                        December 31, 2023, Interest Service Coverage
       Service Coverage Ratio minimal 1,1 (satu koma                     Ratio (ISCR) at least 1.1 (one point one) time
       satu) kali yang berlaku per laporan keuangan 31                   applicable per financial statement May 31, 2024,
       Mei      2024,      dan      Ekuitas    minimal                   and a minimum Equity of Rp3,000,000,000,000.
       Rp3.000.000.000.000.
       Pada tahun 2023, Grup melakukan perhitungan                       In 2023, the Group carried out master
       restrukturisasi induk sesuai akta perjanjian                      restructuring calculations in accordance with
       Master Restructuring Agreement (MRA) induk                        the Master Restructuring Agreement (MRA)
       No. 40 tanggal 25 Agustus 2021 dan akta                           deed no. 40 dated 25 August 2021 and deed of
       perjanjian MRA pada entitas anak.                                 MRA agreement on subsidiary.
       Perjanjian kredit ini dijamin dan diikat dengan                   The credit agreement is secured and bounded
       persediaan dan piutang usaha Perusahaan.                          with the Company’s account receivables. In
       Selain itu, perjanjian kredit ini juga dijamin dan                addition, this credit agreement is also
       diikat dengan aset tetap Perusahaan, dengan                       guaranteed and bound by The Company’s fixed
       rincian sebagai berikut:                                          assets, with detalis as follows:
       •    PT Bank Mandiri (Persero) Tbk, jaminan                       •    PT Bank Mandiri (Persero) Tbk, collateral in
            berupa:                                                           the form of:
            a.   Persediaan barang dan piutang usaha                          a. Inventory and account receivable has
                 yang telah diikat secara fidusia dalam                          been tied by fiduciary, and was
                 Sertifikat   Jaminan     Fidusia   No.                          registered Fiduciary Certificate No
                 W10.00536910.AH.05.02 tanggal 17                                W10.00536910.AH.05.02                 dated
                 Desember           2020          senilai                        December 17, 2020 amounting to
                 Rp6.023.328.000.000.                                            Rp6.023.328.000.000.
            b.   Investasi jangka pendek - deposito                           b. Short term investment - deposit
                 sebesar Rp8.448.200.000.                                        amounting to Rp8,448,200,000.
            c.   3 (tiga) bidang tanah berikut bangunan                       c. 3 (three) plots of land and buildings at
                 kantor cabang Pekanbaru, 1 (satu)                               Pekanbaru Branch office, 1 (one) plot of
                 bidang tanah yang berlokasi di                                  land at Karawang, 13 (thirteen) plots of
                 Karawang, 13 (tiga belas) bidang tanah                          land at Cileungsi, 2 (two) plots of land at
                 yang berlokasi di Cileungsi, 2 (dua)                            Makasar, and 2 (two) plots of land at

                                                            - 145 -
Page 149
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

                bidang tanah yang beralokasi di                                  Bali which have been submitted and tied
                Makassar, dan 2 (dua) bidang tanah                               with guarantee rights amounting to
                yang berlokasi di Bali yang telah                                Rp143,700,000,000.
                diserahkan dan telah diikat hak
                tanggungan    (HT)  dengan     nilai
                Rp143.700.000.000.
       •   PT Bank Negara Indonesia (Persero) Tbk,                      •   PT Bank Negara Indonesia (Persero) Tbk,
           jaminan berupa:                                                  jaminan berupa:
           a.   Persediaan yang telah diikat akta                           a.   Inventory which has been tied by
                fidusia No. 5 tanggal 13 Agustus 1998                            fiduciary deed No. 5 dated August 13,
                dan telah didaftarkan di Kantor                                  1998      and   was      registered    at
                Pendaftaran Fidusia; Sertifikat Jaminan                          the Fiduciary Registration Office;
                Fidusia    No.   C2-4831HT.04.06.TH.                             the Fiduciary Certificate No. C2-
                2001/NTSD tanggal 26 Januari 2001                                4831HT. 04.06.TH.2001/NTSD dated
                senilai Rp8.268.049.363.                                         January 26, 2001 amounting to
                                                                                 Rp8,268,049,363.
           b.   Satu bidang tanah SHGB No. 724                              b.   A plot of land SHGB No. 724 dated
                tanggal 29 Maret 1988 sampai dengan                              March 29, 1988 until December 1,
                1 Desember 2027 seluas 2.098 m2                                  2027, an area of 2,098 sqm located in
                terletak    di    Kelurahan    Cipinang                          Kelurahan      Cipinang      Cempedak,
                Cempedak, Kecamatan Jatinegara,                                  Kecamatan Jatinegara, East Jakarta on
                Jakarta Timur, atas nama Perusahaan                              behalf of the Company amounting to
                senilai     Rp1.500.000.000      sesuai                          Rp1,500,000,000 according to SHT
                dengan SHT No. 397/T/1988, senilai                               No. 397/T/1988, amounting              to
                Rp31.000.000.000       sesuai   dengan                           Rp31,000,000,000 according to SHT.II
                SHT.II     No.      408/2004,    senilai                         No.         408/2004,         amounting
                Rp48.320.400.000 sesuai dengan SHT                               to Rp48,320,400,000 according to SHT
                III No. 06386/2014 dan senilai                                   III No.     06386/2014,       amounting
                Rp11.120.940.000 sesuai         dengan                           to Rp11,120,940,000 according to SHT
                SHT IV No. 01623/2015 dan senilai                                IV No.          01623/2015           and
                Rp250.208.660.000 sesuai dengan                                  amounting        to Rp250,208,660,000
                SHT V No. 03630/2021.                                            according to SHT V No. 03630/2021.
           c.   Satu bidang tanah SHGB No. 38,                              c.   A plot of land with SHGB No. 38, April
                tanggal 21 April 2003 sampai dengan                              21, 2003 until August 06, 2040, an area
                06 Agustus 2040, seluas 1.332 m2                                 of 1,332 sqm, located at Jl. Langko
                terletak di Jl. Langko Kelurahan                                 Kelurahan       Ampenan          Selatan,
                Ampenan         Selatan,     Kecamatan                           Kecamatan Ampenan, Mataram, West
                Ampenan, Mataram, Nusa Tenggara                                  Nusa Tenggara, on behalf of the
                Barat, atas nama Perusahaan Cabang                               Company NTB Branch amounting
                NTB senilai Rp1.332.000.000 sesuai                               to Rp 1,332,000,000 according          to
                dengan SHT.I No. 687/2007, senilai                               SHT.I No. 687/2007, amounting
                Rp1.860.010.000 sesuai dengan SHT                                Rp1,860,010,000 according to SHT II
                II    No.      30/2016    dan    senilai                         No. 30/2016 and amounting to
                Rp31.509.990.000 sesuai dengan SHT                               Rp31,509,990,000 according to SHT III
                III No. 01882/2021.                                              No. 01882/2021.
           d.   Satu bidang tanah SHGB No. 2001                             d.   A plot of land with SHGB No. 2001
                tanggal 1 Juni 2006 sampai dengan                                dated June 1, 2006 until on January 1,
                tanggal 1 Januari 2026, seluas 5.798                             2026, an area of 5,798 sqm, located in
                m2, terletak di Kelurahan Kuta Alam,                             Kelurahan Kuta Alam, Banda Aceh,
                Banda Aceh, Aceh, atas nama                                      Aceh, on behalf of     the     Company
                Perusahaan senilai Rp5.191.600.000                               amounting           to Rp5,191,600,000
                sesuai dengan SHT I No. 323, senilai                             according to         SHT I No. 323,
                Rp 9.779.660.000 sesuai       SHT     II                         amounting Rp9,779,660,000 according
                No. 1375/2015           dan      senilai                         to SHT II No. 1375/2015 and amounting
                Rp11.398.740.000 sesuai dengan SHT                               to Rp11,398,740,000 according to SHT
                III No. 00884/2021.                                              III No. 00884/2021.
           e.   Satu bidang tanah SHGB              No.                     e.   A plot of land with SHGB No. 4 dated
                4 tanggal 10 November 1998 sampai                                November 10, 1998 until December 15,
                dengan 15 Desember 2036 seluas                                   2036 an area of 2,511 sqm,
                2.511 m2, terletak di Desa/Kelurahan                             located in Desa/Kelurahan Batung
                Batung Taba Nan XX, Kecamatan                                    Taba Nan XX, Kecamatan Lubuk-

                                                           - 146 -
Page 150
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)

                Lubuk-Begalung, Padang, Sumatera                                   Begalung, Padang, West Sumatera, on
                Barat, atas nama Perusahaan senilai                                behalf of the Company amounting to
                Rp651.430.000 sesuai dengan SHT I                                  Rp651,430,000 according to SHT I
                No.           3130/2001,          senilai                          No.3130/2001,                  amounting
                Rp6.321.020.000        sesuai   SHT     II                         Rp6,321,020,000 according to SHT II
                No.       169/2016        dan     senilai                          No.      169/2016      and     amounting
                Rp2.012.550.000 sesuai dengan SHT                                  to Rp2,012,550,000 according to SHT
                III No. 01795/2021.                                                III No. 01795/2021.
           f.   Satu bidang tanah SHGB No. 7                                  f.   A plot of land with SHGB No. 7 dated
                tanggal 10 Februari 1993 sampai                                    February 10, 1993 until February 8,
                dengan 08 Februari 2033 seluas 806                                 2033, an area of 806 sqm, located in
                m2, terletak di Kelurahan Kp. Jao,                                 Kelurahan Kp. Jao, Kecamatan Padang
                Kecamatan Padang Barat, Padang,                                    Barat, Padang, West Sumatera, on
                Sumatera       Barat,      atas     nama                           behalf of the Company amounting to
                Perusahaan senilai Rp1.270.880.000                                 Rp1,270,880,000 according to SHT I
                sesuai       dengan       SHT      I No.                           No.129/2001,          amounting        to
                3129/2001, senilai Rp 460.020.000                                  Rp460,020,000 according to SHT II No.
                sesuai dengan SHT II No. 1151/2007,                                1151/2007,           amounting         to
                senilai Rp3.474.910.000 sesuai SHT III                             Rp3,474,910,000, according to SHT III
                No.       1846/2016       dan     senilai                          No. 1846/2016 and amounting to
                Rp2.489.190.000 sesuai dengan SHT                                  Rp2,489,190,000 according to SHT IV
                IV No. 01734/2021.                                                 No. 01734/2021.
           g.   Satu bidang tanah SHGB No.            436                     g.   A plot of land with SHGB No. 436 dated
                tanggal 10 Maret 1998 sampai dengan                                March 10, 1998 until June 19, 2032, an
                19 Juni 2032, seluas 1.004 m2, terletak                            area of 1,004 sqm, located in Desa
                di Desa Sungai Raya, Pontianak,                                    Sungai Raya,         Pontianak,     West
                Kalimantan       Barat,    atas     nama                           Kalimantan, on behalf          of    the
                Perusahaan senilai Rp464.850.000                                   Company        amounting to          Rp
                sesuai dengan          SHT      I     No.                          464,850,000 according          to SHT I
                365/2001,      senilai    Rp747.850.000                            No. 365/2001,          amounting       to
                sesuai      dengan        SHT      II No.                          Rp747,850,000 according to SHT
                4337/2007             dan         senilai                          II No. 4337/2007,      and     amounting
                Rp3.595.940.000 sesuai dengan SHT                                  to Rp3,595,940,000 according to SHT
                III No. 36/2016.                                                   III No. 36/2016.
           h.   Satu bidang tanah SHGB No. 1085                               h.   A plot of land with SHGB No. 1085
                tanggal 18 Desember                  2006                          dated December 18, 2006 until
                sampai            dengan 23 November                               November 23, 2026, an area of 1,404
                2026, seluas 1.404 m2, terletak di                                 sqm, located in Kelurahan Jemur
                Kelurahan         Jemur         Wonosari,                          Wonosari,      Kecamatan       Wonocolo,
                Kecamatan Wonocolo, Surabaya, Jawa                                 Surabaya, East Java, on behalf         of
                Timur, atas nama Perusahaan senilai                                the        Company          amounting to
                Rp2.665.700.000 sesuai dengan SHT                                  Rp2,665,700,000 according to SHT
                I         No. 2952/2007,          senilai                          I       No. 2952/2007,         amounting
                Rp8.333.860.000 sesuai SHT II No.                                  Rp8,333,860,000 according to SHT II
                333/2016 dan senilai Rp3.012.440.000                               No. 333/2016 and amounting             to
                sesuai dengan SHT III No. 02656/2021.                              Rp3,012,440,000 according to SHT III
                                                                                   No. 02656/2021.
           i.   Satu bidang tanah SHGB No. 82                                 i.   A plot of land with SHGB No. 82 dated
                tanggal 20 Oktober 1988 sampai                                     October 20, 1988 to April 13, 2028, an
                dengan 13 April 2028, seluas 2.013 m2,                             area of 2,013 sqm, located in
                terletak di Kelurahan Kalirungkut, Kota                            Kelurahan Kalirungkut, Surabaya City,
                Surabaya, Jawa Timur, atas nama                                    East Java, on behalf of the Company
                Perusahaan senilai Rp2.027.710.000                                 amounting           to Rp2,027,710,000
                sesuai dengan SHT I No. 4772/2001,                                 according to SHT I No.        4772/2001,
                senilai Rp2.474.390.000          sesuai                            amounting        to     Rp2,474,390,000
                dengan       SHT     II No. 2948/2007,                             according to SHT II No.       2948/2007,
                senilai    Rp10.571.030.000      sesuai                            amounting       to     Rp10,571,030,000
                dengan SHT III No. 00621/2016 dan                                  according to SHT III No. 00621/2016
                senilai    Rp13.097.870.000      sesuai                            and amounting to Rp13,097,870,000
                dengan SHT IV No. 02087/2021.                                      according to SHT IV No. 02087/202.



                                                             - 147 -
Page 151
PT WASKITA KARYA (PERSERO) Tbk                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                   (Expressed in Rupiah, unless otherwise stated)

           j. Satu bidang tanah SHGB No. 2                               j.   A plot of land with SHGB No. 2 dated
              tanggal 25 Juni 1997 sampai dengan 7                            June 25, 1997 until October 7, 2036, an
              Oktober 2036, seluas 1.000 m2,                                  area of 1,000 sqm, located in
              terletak di Kelurahan Pasir Panjang,                            Kelurahan Pasir Panjang, Kecamatan
              Kecamatan Kota Lama, Kota Kupang,                               Kota Lama, Kupang City, East Nusa
              Nusa Tenggara Timur, atas nama                                  Tenggara, on behalf of the Company
              Perusahaan senilai Rp 402.860.000                               amounting         to     Rp402,860,000
              sesuai dengan SHT I No. 390/2001 dan                            according to SHT I No. 390/2001
              senilai Rp636.540.000 sesuai dengan                             and     amount       to  Rp636,540,000
              SHT       II   No. 239/2007     senilai                         according to SHT II No. 239/2007
              Rp3.085.070.000 sesuai         dengan                           amounting        to     Rp3,085,070,000
              SHT      III No. 1387/2015 dan senilai                          according to SHT III No. 1387/2015
              Rp2.359.530.000 sesuai dengan SHT                               and amounting to Rp2,359,530,000
              IV No. 00968/2021.                                              according to SHT IV No. 00968/2021.
           k. Satu bidang tanah SHGB No. 24                              k.   A plot of land with SHGB No. 24 dated
              tanggal 24 Oktober 1997 sampai                                  October 24, 1997 until October 7, 2036,
              dengan 7 Oktober 2036, seluas 595                               an area of 595 sqm, located in
              m2, terletak di Kelurahan Oesapa                                Kelurahan Oesapa Barat, Kecamatan
              Barat, Kecamatan Kelapa Lima, Kota                              Kelapa Lima, Kupang City, East Nusa
              Kupang, Nusa Tenggara Timur, atas                               Tenggara, on behalf of the Company
              nama          Perusahaan        senilai                         amounting to Rp49,260,000 according
              Rp49.260.000 sesuai dengan SHT I                                to SHT I No. 374/2001, amounting to
              No. 374/2001 dan senilai Rp39.740.000                           Rp39,740,000 according to SHT II No.
              sesuai dengan SHT II No. 240/2007                               240/2007        and     amounting     to
              dan senilai Rp538.000.000 sesuai                                Rp538,000,000 according to SHT III
              dengan SHT III No. 0970/2021.                                   No. 0970/2021.
           l. Satu bidang tanah SHGB No. 13                              l.   A plot of land with SHGB No. 13 dated
              tanggal 30 Agustus 2023 sampai                                  August 30, 2023 until August 30, 2043,
              dengan 30 Agustus 2043, seluas 4.830                            an area of 4,830 sqm, located at Jl.
              m2, terletak di Jl. Bumi 2 Kecamatan                            Bumi 2, Kecamatan Kupang Tengah,
              Kupang Tengah,         Kupang,   Nusa                           Kupang, East Nusa       Tenggara,    on
              Tenggara       Timur,    atas    nama                           behalf     of the Company amounting to
              Perusahaan senilai Rp457.590.000 dan                            Rp457,590,000 dan Rp288.000.000
              Rp288.000.000 sesuai dengan SHT I                               according to SHT I No. 375/2001..
              No. 375/2001.
           m. Satu bidang tanah SHGB No. 14                              m. A plot of land with SHGB No. 14 dated
              tanggal 30 Agustus 2023 sampai                                August 30, 2023 until August 30, 2043,
              dengan 30 Agustus 2043, seluas 4.800                          an area of 4,800 sqm, located at Jl.
              m2, terletak di Jl. Bumi 2 Kecamatan                          Bumi 2, Kecamatan Kelapa Lima,
              Kelapa Lima, Kupang, Nusa Tenggara                            Kupang, East Nusa Tenggara, on
              Timur, atas nama Perusahaan senilai                           behalf of the Company amounting to
              Rp602.410.000 sesuai dengan SHT II                            Rp602,410,000 according to SHT        II
              No.       238/2007      dan     senilai                       No. 238/2007        and      amounting
              Rp7.828.880.000       sesuai   dengan                         Rp7,828,880,000 according to SHT III
              SHT III No. 1386/2015 dan senilai                             No.     1386/2015     and    amounting
              Rp4.552.120.000 sesuai dengan SHT                             to Rp4,552,120,000 according to SHT
              IV No. 00969/2021.                                            IV No. 00969/2021.
           n. Satu bidang tanah SHGB No. 24                              n. A plot of land with SHGB No. 24 dated
              tanggal 11 Juni 1993 sampai dengan                            June 11, 1993 until May 25, 2013, an
              25 Mei 2013, seluas 276 m2, terletak di                       area of 276 sqm, located in Kelurahan
              Kelurahan Tikala Ares, Kecamatan                              Tikala Ares, Kecamatan Wenang,
              Wenang, Kota Manado, Sulawesi                                 Manado, North Sulawesi, on behalf of
              Utara, atas nama Perusahaan senilai                           the      Company       amounting    to
              Rp263.530.000, sesuai dengan SHT I                            Rp263,530,000 according to SHT I
              No.       737/2001      dan     senilai                       No. 737/2001 and amounting           to
              Rp121.670.000, sesuai dengan SHT II                           Rp121,670,000 according to SHT
              No. 667/2007. SHGB tersebut telah                             II No. 667/2007. The land right (SHGB)
              diperpanjang sampai dengan 25 Mei                             has been extended until May 25, 2033
              2033 dan senilai Rp 1.704.800.000                             and amounting to Rp 1,704,800,000
              sesuai dengan SHT III No. 00984/2021.                         according to       SHT      III    No.
                                                                            00984/2021.


                                                        - 148 -
Page 152
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

           o.   Satu bidang tanah SHGB No. 1                                o.   A plot of land with SHGB No. 1 dated
                tanggal 7 Januari 1992 sampai dengan                             January 7, 1992 until December 28,
                28 Desember 2040, seluas 4.040 m2,                               2040, an area of 4,040 sqm, located in
                terletak di Desa Cileunyi Wetan,                                 Desa Cileunyi Wetan, Kecamatan
                Kecamatan        Cileunyi,    Kabupaten                          Cileunyi, Kabupaten Bandung, West
                Bandung, Jawa Barat, atas nama                                   Java, on behalf of the          Company
                Perusahaan senilai Rp1.516.520.000,                              amounting to            Rp1,516,520,000
                sesuai dengan SHT I No. 2927/2001,                               according to SHT I No. 2927/2001,
                senilai Rp994.180.000 sesuai dengan                              amounting             to Rp994,180,000
                SHT II No. 1613/2007 dan senilai                                 according to SHT II No. 1613/2007
                Rp3.182.880.000       sesuai    dengan                           and amounting to Rp3,182,880,000
                SHT      III No. 10710/2015 dan senilai                          according to SHT III No. 10710/2015
                Rp5.806.420.000 sesuai dengan SHT                                and amounting to Rp5,806,420,000
                IV No. 07540/2021. Tanah yang                                    according to SHT IV No. 07540/2021.
                dijaminkan termasuk bangunan dan                                 Land which is pledged as collateral
                segala sesuatu yang berada di atas                               consisted of buildings and related
                tanah tersebut baik yang telah ada                               things already existing in the land, or to
                maupun yang akan ada.                                            will be exist there.
           p.   Satu bidang tanah SHGB No. 30                               p.   A plot of land with SHGB No. 30 dated
                tanggal 26 Januari 2007 sampai                                   January 26, 2007 until January 26,
                dengan 26 Januari 2027, seluas 1.250                             2027, an area of 1,250 sqm, located in
                m2, terletak di Kelurahan Sumerta,                               Kelurahan        Sumerta,     Kecamatan
                Kecamatan Denpasar Timur, Bali, atas                             Denpasar Timur, Bali, on behalf of the
                nama           Perusahaan        senilai                         Company              amounting          to
                Rp3.404.000.000 sesuai dengan SHT I                              Rp3,404,000,000 according to SHT
                No.            2012/2007         senilai                         I     No. 2012/2007      amounting      to
                Rp18.705.400.000       sesuai   dengan                           Rp18,705,400,000 according to SHT II
                SHT      II No. 01546/2015 dan senilai                           No. 01546/2015 and amounting
                Rp38.600.000 sesuai dengan SHT III                               to Rp38,600,000 according to SHT
                No.     03339/2021.       Tanah    yang                          III No. 03339/2021. Land which is
                dijaminkan termasuk bangunan dan                                 pledged as collateral consisted of
                segala sesuatu yang berada di atas                               buildings and related things already
                tanah tersebut, baik yang telah ada                              existing in the land, or to will be exist
                maupun yang akan ada.                                            there.
           q.   Satu bidang tanah SHGB No. 1                                q.   A plot of land with SHGB No. 1 dated
                tanggal 13 November 1987 sampai                                  November 13, 1987 until October 13,
                dengan 13 Oktober 2027, seluas 1.905                             2027, an area of 1,905 sqm, located in
                m2, terletak di Jl. P. Antasari No. 1/4,                         Jl. P. Antasari No. 1/4, Tanjung Baru,
                Tanjung Baru, Bandar Lampung atas                                Bandar Lampung, on behalf of
                nama           Perusahaan        senilai                         the      Company        amounting       to
                Rp30.000.000 sesuai dengan S. Hip                                Rp30,000,000 according to S. Hip No.
                No. 3181 tanggal 13 September 1989,                              3181 dated September 13, 1989,
                senilai Rp2.222.100.000 sesuai dengan                            amounting         to    Rp2,222,100,000
                SHT       II    No. 01057/2007      dan                          according to SHT II No. 01057/2007
                senilai      Rp3.642.670.000     sesuai                          and amounting to Rp3,642,670,000
                dengan SHT III No. 02119/2016 dan                                according to SHT III No. 02119/2016
                senilai Rp2.993.230.000 sesuai dengan                            and amounting to Rp2,993,230,000
                SHT IV No. 01882/2021.                                           according to SHT IV No. 01882/2021.
           r.   Kendaraan bermotor yang terdiri dari 1                      r.   Vehicles consisting of 1 (one) unit VW
                (satu) unit VW Caravelle 2.0 tahun                               Caravelle 2.0 year 2012 tied by
                2012, yang diikat fidusia sesuai Akta                            fiduciary in accordance to Fiduciary
                Pemberian Jaminan Fidusia Atas                                   Guarantee              Deed           No.
                Kendaraan        No.    W.10.00426020.                           W.10.00426020.AH.05.01              dated
                AH.05.01 tanggal 26 Oktober 2015                                 October       26,     2015     amounting
                senilai Rp620.000.000.                                           to Rp620,000,000.
       •   PT Bank Rakyat Indonesia (Persero) Tbk,                      •   PT Bank Rakyat Indonesia (Persero) Tbk,
           jaminan berupa sebidang tanah dengan                             collateral in the form of a piece of land with
           SHGB No. 655 dengan masa berlaku dari                            land right (SHGB) No. 655 dated
           tanggal 7 Januari 1992 sampai dengan 8                           January 7, 1992 until May 8, 2033 that have
           Mei 2033 yang telah diikat hak tanggungan                        been tied with its guarantee rights
           dengan nilai Rp16.186.000.000 sesuai                             amounting to Rp16,186,000,000 according
           dengan SHT I No. 8952/2010 tanggal                               to SHT I No. 8952/2010 dated September
                                                           - 149 -
Page 153
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

           30      September       2010,        senilai                       30, 2010 amounting to Rp8,814,000,000
           Rp8.814.000.000 sesuai dengan SHT II No.                           according to SHT II No. 6490/2015 dated
           6490/2015 tanggal 24 Juni 2015 dan senilai                         Juny 24, 2015 and amounting to
           Rp30.000.000.000 sesuai dengan SHT III                             Rp30,000,000,000 according to SHT III
           No. 3982/2023 tanggal 11 April 2023.                               No. 3982/2023 dated April 11, 2023.
   Amortisasi diskonto untuk tahun yang berakhir pada                 Amortization of discount for the year ended
   30 September 2024 sebesar Rp725.791.754.326,                       September       30,     2024       amounted      to
   diakui sebagai bagian dari beban keuangan pada                     Rp725,791,754,326, which is recognized as part of
   laporan laba rugi dan penghasilan komprehensif                     financial expenses in the profit and loss statement
   lain.                                                              and other comprehensive income.

   Di dalam utang PT Bank Syariah Indonesia Tbk                       In PT Bank Syariah Indonesias Tbk’s long-term bank
   jangka panjang tanggal 30 September 2024 dan                       debt dated September 30, 2024 and December 31,
   31 Desember 2023 termasuk masing-masing                            2023,     including    Rp485,928,303,308       and
   sebesar            Rp485.928.303.308           dan                 Rp485,928,232,951 respectively, they are business
   Rp485.928.232.951 merupakan utang usaha yang                       debts that guarantee the SCF facilities owned by
   menjadi jaminan fasilitas SCF yang dimiliki vendor                 vendors that have matured.
   yang telah jatuh tempo.

   Pada     tahun     2021   Perusahaan    melakukan                  In 2021, the Company restructured long-term bank
   restrukturisasi atas pinjaman bank jangka panjang                  loans pursuant to deed Master Restructuring
   sesuai dengan akta perjanjian Master Restructuring                 Agreement (MRA) No. 40 dated August 25, 2021.
   Agreement (MRA) induk No. 40 tanggal 25 Agustus
   2021.

   Dalam perjalanannya, Perusahaan menemui                            Along the way, the Company encountered several
   beberapa      kendala    sehingga   menyebabkan                    obstacles which caused the Company to conduct a
   Perusahaan melakukan reviu atas implementasi                       review of the implementation of MRA 2021. In this
   MRA tahun 2021. Dalam hal ini, Perusahaan                          case, the Company proposed and negotiated a
   mengusulkan       dan    menegosiasikan     skema                  restructuring scheme based on financial capabilities
   restrukturisasi berdasarkan kemampuan keuangan                     in both the short and long term. As of the date of
   baik dalam jangka pendek maupun jangka panjang.                    reporting, the Company has obtained approval and
   Sampai dengan tanggal pelaporan, Perusahaan                        signed changes to the restructuring documents.
   telah mendapatkan persetujuan dan melakukan                        The Company is currently in the process of fulfilling
   penandatanganan terhadap perubahan dokumen-                        the effective requirements which are targeted for
   dokumen restrukturisasi. Perusahaan saat ini dalam                 completion in October 2024.
   proses pemenuhan syarat efektif yang ditargetkan
   selesai pada Oktober 2024.

   Utang bank Perusahaan yang disajikan merupakan                     The Company's bank debt presented is the result of
   hasil restrukturisasi pinjaman bank dengan                         bank loan restructuring with fair value calculations
   perhitungan nilai wajar dilakukan oleh akuntan                     carried out by other independent accountants.
   independen lain. Selisih antara nilai wajar dengan                 The difference between fair value and the value of
   nilai utang bank yang direstrukturisasi dicatat                    the restructured bank's debt is recorded as
   sebagai laba hasil restrukturisasi.                                restructured profit.

   Perhitungan nilai wajar atas restrukturisasi dilakukan             The calculation of the fair value of the restructuring
   pada tahun berjalan (catatan 4).                                   is carried out in the current year (note 4).

   Pihak Ketiga                                                       Third Parties

   Perjanjian Restrukturisasi Induk                                   Master Restructuring Agreement

   Berdasarkan Perjanjian Aksesi pada tanggal                         Based on the Accession Agreement as September
   15 September 2021, Pihak-pihak yang melakukan                      15,    2021,    the    Parties    carrying  out
   Aksesi, yang terdiri dari PT Bank BNP Paribas                      the Accession, consist of PT Bank BNP Paribas
   Indonesia, PT Bank BTPN Tbk, PT Bank China                         Indonesia, PT Bank BTPN Tbk, PT Bank China
   Construction      Bank       Indonesia    Tbk,                     Construction      Bank       Indonesia     Tbk,
   PT Bank CTBC Indonesia, PT         Bank   KEB                      PT Bank CTBC Indonesia, PT Bank KEB Hana
   Hana      Indonesia, PT Maybank Indonesia Tbk,                     Indonesia, PT Maybank Indonesia Tbk, PT Bank
   PT Bank OCBC NISP Tbk, Bank of China Ltd,                          OCBC NISP Tbk, Bank of China Ltd, PT Bank Pan
   PT Bank Pan Indonesia Tbk, PT Bank Permata                         Indonesia Tbk, PT Bank Permata Indonesia Tbk,
                                                            - 150 -
Page 154
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

   Indonesia Tbk, PT Bank QNB Indonesia Tbk,                          PT Bank QNB Indonesia Tbk, PT Bank Resona
   PT Bank Resona Perdania, PT Bank SBI Indonesia,                    Perdania,        PT      Bank      SBI     Indonesia,
   PT Bank Shinhan Indonesia dan PT Bank UOB                          PT Bank Shinhan Indonesia and PT Bank UOB
   Indonesia, menyatakan untuk menjadi pihak dalam                    Indonesia, declares to be a party to the Master
   Perjanjian Restrukturisasi Induk dan berjanji untuk                Restructuring Agreement and undertakes to carry
   melaksanakan seluruh kewajiban yang dinyatakan                     out all obligations stated in the Master Restructuring
   dalam Perjanjian Restrukturisasi Induk.                            Agreement.

   Pihak-pihak Bank setuju melakukan resrukturisasi                   The Bank's parties agreed to restructure
   atas kewajiban-kewajiban pembayaran Perusahaan                     the Company's payment liabilities in relation to
   sehubungan dengan fasilitas-fasilitas pembiayaan                   the financing facilities provided by the banks with
   yang diberikan oleh pihak-pihak bank dengan jumlah                 total amount of Rp29,252,309,664,899.
   keseluruhan sebesar Rp29.252.309.664.899.

   Pada     tahun     2021   Perusahaan    melakukan                  In 2021, the Company restructured long-term bank
   restrukturisasi atas pinjaman bank jangka panjang                  loans pursuant to deed Master Restructuring
   sesuai dengan akta perjanjian Master Restructuring                 Agreement (MRA) No. 40 dated August 25, 2021.
   Agreement (MRA) induk No. 40 tanggal 25 Agustus
   2021.

   Dalam perjalanannya, Perusahaan menemui                            Along the way, the Company encountered several
   beberapa      kendala    sehingga   menyebabkan                    obstacles which caused the Company to conduct a
   Perusahaan melakukan reviu atas implementasi                       review of the implementation of MRA 2021. In this
   MRA tahun 2021. Dalam hal ini, Perusahaan                          case, the Company proposed and negotiated a
   mengusulkan       dan    menegosiasikan     skema                  restructuring scheme based on financial capabilities
   restrukturisasi berdasarkan kemampuan keuangan                     in both the short and long term. As of the date of
   baik dalam jangka pendek maupun jangka panjang.                    reporting, the Company has obtained approval and
   Sampai dengan tanggal pelaporan, Perusahaan                        signed changes to the restructuring documents.
   telah mendapatkan persetujuan dan melakukan                        The Company is currently in the process of fulfilling
   penandatanganan terhadap perubahan dokumen-                        the effective requirements which are targeted for
   dokumen restrukturisasi. Perusahaan saat ini dalam                 completion in October 2024.
   proses pemenuhan syarat efektif yang ditargetkan
   selesai pada Oktober 2024.

   Utang bank Perusahaan yang disajikan merupakan                     The Company's bank debt presented is the result of
   hasil restrukturisasi pinjaman bank dengan                         bank loan restructuring with fair value calculations
   perhitungan nilai wajar dilakukan oleh akuntan                     carried out by other independent accountants.
   independen lain. Selisih antara nilai wajar dengan                 The difference between fair value and the value of
   nilai utang bank yang direstrukturisasi dicatat                    the restructured bank's debt is recorded as
   sebagai laba hasil restrukturisasi.                                restructured profit.

   Perhitungan nilai wajar atas restrukturisasi dilakukan             The calculation of the fair value of the restructuring
   pada tahun berjalan (catatan 4).                                   is carried out in the current year (note 4).

   Entitas Anak                                                       Subsidiaries

   Pada tahun 2021 - 2023 Entitas Anak masing-                        In 2021 - 2023, the Subsidiaries of WBP, WKR, WKI
   masing WBP, WKR, WKI dan PBTR melakukan                            and PBTR will restructure long-term bank loans.
   restrukturisasi atas pinjaman bank jangka panjang.

   Utang bank entias anak yang disajikan merupakan                    The subsidiary’s bank loan presented is the result of
   hasil restrukturisasi pinjaman bank dengan                         bank loan restructuring with fair value calculations
   perhitungan nilai wajar dilakukan oleh akuntan                     carried out by other independent accountants.
   independen lain. Selisih antara nilai wajar dengan                 The difference between fair value and the value of
   nilai utang bank yang direstrukturisasi dicatat                    restructured bank debt is recorded as the profit
   sebagai laba (rugi) hasil restrukturisasi.                         (loss) resulting from the restructuring.

   Perhitungan nilai wajar atas restrukturisasi WKR,                  The fair value calculation for the restructuring of
   WKI dan PBTR dilakukan pada tahun berjalan                         WKR, WKI and PBTR is carried out in the current
   (catatan 4).                                                       year (note 4).



                                                            - 151 -
Page 155
PT WASKITA KARYA (PERSERO) Tbk                                                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                     (Expressed in Rupiah, unless otherwise stated)

   Perusahaan                                                                                      The Company
   Pihak Berelasi                                                                                  Related Parties
   2.   Sindikasi      Kredit     Modal      Kerja                                               2.     Working     Capital   Syndication    Credit
        PT Bank Mandiri (Persero) Tbk, PT Bank BNI                                                      PT Bank Mandiri (Persero) Tbk, PT Bank BNI
        (Persero) Tbk, PT Bank BRI (Persero) Tbk,                                                       (Persero) Tbk, PT Bank BRI (Persero) Tbk,
        PT Bank Pembangunan Daerah Jawa Barat                                                           PT Bank Pembangunan Daerah Jawa Barat
        dan Banten Tbk dan PT Bank Pembangunan                                                          dan Banten Tbk and PT Bank Pembangunan
        Daerah Sumut                                                                                    Daerah Sumut
        Pinjaman Bank - Sindikasi Modal Kerja
                                                                       Fasilitas           Tanggal                           Tingkat bunga per
                                                Jenis fasilitas/      maksimum/           perjanjian/     Tanggal jatuh            tahun/         30 September/         31 Desember/
             Kreditur/           Entitas/          Type of            Maximum             Agreement          tempo/           Interest rate per   September 30,         December 31,
             Creditors           Entities         facilities            facility             date         Maturity date            annum              2024                  2023

        PT Bank Mandiri       Perusahaan/ The   Sindikasi Kredit   8.076.463.000.000      25 Oktober/      Maksimal tiga        Suku bunga        4.628.522.570.724   4.624.166.434.872
        (Persero) Tbk,           Company         Modal Kerja/                             October 25,       tahun sejak            sebesar
        PT Bank Negara                          Working Capital                              2021             kontrak          referance rate
        Indonesia (Persero)                       Syndication                                                perjanjian      ditambah margin/
        Tbk, PT Bank Rakyat                          Credit                                               ditandatangani/    The interest rate
        Indonesia (Persero)                                                                               A maximum of        is the reference
        Tbk                                                                                              three years after    rate plus margin
                                                                                                            the contract
                                                                                                           agreement is
                                                                                                               signed


        Berdasarkan akta Notaris Ashoya Ratam, S.H.,                                                    Based on the deed of Notary Ashoya Ratam,
        M.Kn No. 38 tanggal 25 Oktober 2021,                                                            S.H., M.Kn. No. 38 dated October 25, 2021,
        Perusahaan menandatangani perjanjian Kredit                                                     the Company signed a Syndicated Loan
        Sindikasi dengan PT Bank Mandiri (Persero)                                                      agreement with PT Bank Mandiri (Persero) Tbk,
        Tbk, PT Bank BNI (Persero) Tbk dan                                                              PT Bank BNI (Persero) Tbk and PT Bank BRI
        PT Bank BRI (Persero) Tbk. Bank Kreditur                                                        (Persero) Tbk. The creditor bank provides
        tersebut memberikan fasilitas kredit sebesar                                                    a credit facility of Rp8,076,463,000,000 with
        Rp8.076.463.000.000 dengan sublimit Non                                                         a Non-Cash Loan sublimit of up to
        Cash         Loan        sampai         dengan                                                  Rp6,268,359,000,000 and Supplier Financing
        Rp6.268.359.000.000 dan Supplier Financing                                                      sublimit   of    up   to Rp6,268,359,000,000.
        sampai dengan Rp6.268.359.000.000. Jangka                                                       The term of this loan is a maximum of three
        waktu pinjaman ini maksimal tiga tahun sejak                                                    years from the signing of the contract
        penandatanganan kontrak perjanjian dan suku                                                     agreement and the interest rate is the reference
        bunga sebesar referance rate ditambah margin.                                                   rate plus margin. This credit facility is provided
        Fasilitas Kredit ini diberikan Kreditur untuk                                                   by creditors to be used as working capital for
        digunakan sebagai modal kerja untuk pelaksaan                                                   project implementation in the context of
        Proyek dalam rangka Program Pemulihan                                                           the National Economic Recovery Program. This
        Ekonomi     Nasional.      Pinjaman ini dijamin                                                 loan is guaranteed by Government Guarantee in
        oleh Jaminan Pemerintah sesuai ketentuan                                                        accordance with the Regulation of the Minister
        Peraturan     Menteri   Keuangan      Republik                                                  of Finance of the Republic of Indonesia No.
        Indonesia No. 211/PMK.08/2020.                                                                  211/PMK.08/2020.
        Berdasarkan      akta    pemindahan      tanggal                                                Based on the deed of transfer dated
        28 Juni 2022, PT Bank BNI (Persero) Tbk                                                         June 28, 2022, PT Bank BNI (Persero) Tbk
        mengalihkan      sebagian     hak-haknya    dan                                                 transferred its rights and obligations based on
        kewajibannya bedasarkan Perjanjian Kredit                                                       the Syndicated Credit Agreement to Bank
        Sindikasi kepada Bank Pembangunan Daerah                                                        Pembangunan Daerah Jawa Barat Tbk and
        Jawa      Barat    dan    Banten     Tbk    dan                                                 PT Bank Sumut. Obligations and rights taken
        PT Bank Sumut. Kewajiban dan hak yang                                                           over by Bank Pembangunan Daerah Jawa Barat
        diambil alih Bank Pembangunan Daerah Jawa                                                       Tbk mainly include commitments under
        Barat dan Banten Tbk. terutama meliputi                                                         the Syndicated Credit Agreement amounting to
        komitmen     berdasarkan Perjanjian Kredit                                                      Rp118,608,226,840, the rights to the loan
        Sindikasi sebesar Rp118.608.226.840, hak atas                                                   amount that have been disbursed and have not
        jumlah pinjaman yang telah dicairkan dan belum                                                  been paid by the Company           amounting to
        dibayarkan          Perusahaan          sebesar                                                 Rp131,391,773,160 and interest based on
        Rp131.391.773.160 dan bunga berdasarkan                                                         the      Syndicated       Credit      agreement.
        perjanjian Kredit Sindikasi. Kewajiban dan hak                                                  The obligations and rights taken over by
        yang diambil alih PT Bank Sumut terutama                                                        PT Bank Sumut mainly include commitments
        meliputi komitmen berdasarkan Perjanjian                                                        under the Syndicated Credit Agreement
        Kredit Sindikasi sebesar Rp35.754.841.279, hak                                                  amounting to Rp35,754,841,279, rights to
        atas jumlah pinjaman yang telah dicairkan dan                                                   the loan amount that has been disbursed and
        belum     dibayarkan     Perusahaan     sebesar                                                 has not been paid by the Company amounting

                                                                                       - 152 -
Page 156
PT WASKITA KARYA (PERSERO) Tbk                                                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                   (Expressed in Rupiah, unless otherwise stated)

       Rp64.245.158.721 dan bunga                            berdasarkan                              to Rp64,245,158,721 and interest based                                on
       perjanjian Kredit Sindikasi.                                                                   the Syndicated Credit agreement.

       Sampai dengan tanggal pelaporan, Kreditur                                                      As of the date of reporting, KMK Guarantee
       KMK Penjaminan dan Stakeholder KMK                                                             Creditors and KMK Guarantee Stakeholders
       Penjaminan      telah    menyetujui    usulan                                                  have approved the proposed maturity extension
       perpanjangan jatuh tempo dan perubahan                                                         and changes to other provisions on September
       ketentuan lainnya pada 24 September 2024.                                                      24, 2024. The Company is currently in
       Perusahaan saat ini dalam proses pemenuhan                                                     the process of fulfilling the effective
       syarat efektif yang ditargetkan selesai pada                                                   requirements which is targeted for completion in
       Oktober 2024.                                                                                  October 2024.
   Pihak Ketiga                                                                                  Third Parties
       Pinjaman Bank - Sindikasi Modal Kerja
                                                                     Fasilitas           Tanggal                           Tingkat bunga per
                                              Jenis fasilitas/      maksimum/           perjanjian/    Tanggal jatuh             tahun/         30 September/     31 Desember/
            Kreditur/          Entitas/          Type of            Maximum             Agreement         tempo/            Interest rate per   September 30,     December 31,
            Creditors          Entities         facilities            facility             date        Maturity date             annum              2024              2023

       PT Bank              Perusahaan/ The   Sindikasi Kredit   8.076.463.000.000      25 Oktober/      Maksimal tiga        Suku bunga        653.972.238.382   653.972.238.382
       Pembangunan             Company         Modal Kerja/                             October 25,       tahun sejak            sebesar
       Daerah Jawa Barat                      Working Capital                              2021             kontrak          referance rate
       dan Banten Tbk dan                       Syndication                                                perjanjian      ditambah margin/
       PT Bank                                     Credit                                               ditandatangani/    The interest rate
       Pembangunan                                                                                      A maximum of        is the reference
       Daerah Sumatera                                                                                 three years after    rate plus margin
       Utara                                                                                              the contract
                                                                                                         agreement is
                                                                                                             signed


       Berdasarkan akta Notaris Ashoya Ratam, S.H.,                                                   Based on the deed of Notary Ashoya Ratam,
       M.Kn No. 38 tanggal 25 Oktober 2021,                                                           S.H., M.Kn. No. 38 dated October 25, 2021,
       Perusahaan menandatangani perjanjian Kredit                                                    the Company signed a Syndicated Loan
       Sindikasi dengan PT Bank Mandiri (Persero)                                                     agreement with PT Bank Mandiri (Persero) Tbk,
       Tbk, PT Bank BNI (Persero) Tbk dan                                                             PT Bank BNI (Persero) Tbk and PT Bank BRI
       PT Bank BRI (Persero) Tbk. Bank Kreditur                                                       (Persero) Tbk. The creditor bank provides
       tersebut memberikan fasilitas kredit sebesar                                                   a credit facility of Rp8,076,463,000,000 with
       Rp8.076.463.000.000 dengan Sublimit Non                                                        a Non-Cash Loan sublimit of up to
       Cash         Loan        sampai        dengan                                                  Rp6,268,359,000,000 and Supplier Financing
       Rp6.268.359.000.000 dan Supplier Financing                                                     sublimit of up to Rp6,268,359,000,000. The term
       sampai dengan Rp6.268.359.000.000. Jangka                                                      of this loan is a maximum of three years from
       waktu pinjaman ini maksimal tiga tahun sejak                                                   the signing of the contract agreement and
       penandatanganan kontrak perjanjian dan suku                                                    the interest rate is the reference rate plus
       bunga sebesar referance rate ditambah margin.                                                  margin. This credit facility is provided by
       Fasilitas Kredit ini diberikan Kreditur untuk                                                  creditors to be used as working capital for
       digunakan sebagai modal kerja untuk pelaksaan                                                  project implementation in the context of
       Proyek dalam rangka Program Pemulihan                                                          the National Economic Recovery Program. This
       Ekonomi Nasional. Pinjaman ini dijamin oleh                                                    loan is guaranteed by Government Guarantee In
       Jaminan     Pemerintah     sesuai   ketentuan                                                  accordance with the Regulation of the Minister
       Peraturan     Menteri   Keuangan      Republik                                                 of Finance of the Republic of Indonesia
       Indonesia No. 211/PMK.08/2020.                                                                 No. 211/PMK.08/2020.
       Berdasarkan      akta    pemindahan      tanggal                                               Based on the deed of transfer dated
       28 Juni 2022, PT Bank BNI (Persero) Tbk                                                        June 28, 2022, PT Bank BNI (Persero) Tbk
       mengalihkan      sebagian     hak-haknya     dan                                               transferred its rights and obligations based on
       kewajibannya bedasarkan Perjanjian Kredit                                                      the Syndicated Credit Agreement to Bank
       Sindikasi kepada Bank Pembangunan Daerah                                                       Pembangunan Daerah Jawa Barat Tbk and
       Jawa      Barat    dan    Banten     Tbk     dan                                               PT Bank Sumut. Obligations and rights taken
       PT Bank Sumut. Kewajiban dan hak yang                                                          over by Bank Pembangunan Daerah Jawa Barat
       diambil alih Bank Pembangunan Daerah Jawa                                                      Tbk mainly include commitments under
       Barat dan Banten Tbk. terutama meliputi                                                        the Syndicated Credit Agreement amounting to
       komitmen     berdasarkan     Perjanjian    Kredit                                              Rp118,608,226,840, the rights to the loan
       Sindikasi sebesar Rp118.608.226.840, hak atas                                                  amount that have been disbursed and have not
       jumlah pinjaman yang telah dicairkan dan belum                                                 been paid by the Company amounting to
       dibayarkan          Perusahaan          sebesar                                                Rp131,391,773,160 and interest based on
       Rp131.391.773.160 dan bunga berdasarkan                                                        the      Syndicated       Credit      agreement.
       perjanjian Kredit Sindikasi. Kewajiban dan hak                                                 The obligations and rights taken over by
       yang diambil alih PT Bank Sumut terutama                                                       PT Bank Sumut mainly include commitments
       meliputi komitmen berdasarkan Perjanjian                                                       under the Syndicated Credit Agreement

                                                                                     - 153 -
Page 157
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

        Kredit Sindikasi sebesar Rp35.754.841.279, hak                    amounting to Rp35,754,841,279, rights to
        atas jumlah pinjaman yang telah dicairkan dan                     the loan amount that has been disbursed and
        belum     dibayarkan     Perusahaan    sebesar                    has not been paid by the Company amounting
        Rp64.245.158.721 dan bunga berdasarkan                            to Rp64,245,158,721 and interest based on
        perjanjian Kredit Sindikasi.                                      the Syndicated Credit agreement.

        Sampai dengan tanggal pelaporan, Kreditur                         As of the date of reporting, KMK Guarantee
        KMK Penjaminan dan Stakeholder KMK                                Creditors and KMK Guarantee Stakeholders
        Penjaminan      telah    menyetujui    usulan                     have approved the proposed maturity extension
        perpanjangan jatuh tempo dan perubahan                            and changes to other provisions on September
        ketentuan lainnya pada 24 September 2024.                         24, 2024. The Company is currently in
        Perusahaan saat ini dalam proses pemenuhan                        the process of fulfilling the effective
        syarat efektif yang ditargetkan selesai pada                      requirements which is targeted for completion in
        Oktober 2024.                                                     October 2024.

   Entitas Anak - WTR                                                Subsidiary - WTR

   Pihak Berelasi                                                    Related Parties

   1.   PT Bank Negara Indonesia (Persero) Tbk                       1.   PT Bank Negara Indonesia (Persero) Tbk

        a.   PBTR                                                         a.   PBTR

             Berdasarkan Akta Notaris Ariani Lakhsmijati                       Based on Notarial Deed No.37 dated
             Rachim, S.H., No. 37 tanggal 24 Mei 2017                          May 24, Based on Notarial Deed No. 37 of
             dan Akta Notaris Ariani Lakhsmijati Rachim,                       Ariani Lakhsmijati Rachim, S.H., dated
             S.H., No. 48 tanggal 27 Agustus 2018,                             May 24, 2017 and Notarial Deed No. 48 of
             PBTR telah menandatangani perjanjian                              Ariani Lakhsmijati Rachim S.H., dated
             Kredit Sindikasi dengan PT Bank Negara                            August 27, 2018, PBTR entered into
             Indonesia (Persero) Tbk, PT Bank Panin                            Syndicated Loan Agreement with PT Bank
             Tbk, PT Bank Papua, PT Bank                                       Negara Indonesia (Persero) Tbk, PT Bank
             Pembangunan Daerah Sulawesi Selatan                               Panin      Tbk,      PT    Bank     Papua,
             dan Sulawesi Barat, PT        Bank     Arta                       PT Bank Pembangunan Daerah Sulawesi
             Graha      Internasional     Tbk, PT Bank                         Selatan dan Sulawesi Barat, PT Bank Arta
             Pembangunan Daerah Maluku dan Maluku                              Graha Internasional Tbk, PT Bank
             Utara, PT Bank Pembangunan Daerah                                 Pembangunan            Daerah       Maluku
             Daerah          Istimewa       Yogyakarta,                        danMaluku Utara, PT Bank Pembangunan
             PT Bank Pembangunan Daerah Jambi,                                 Daerah Daerah Istimewa Yogyakarta,
             PT Bank Nagari, PT Bank Pembangunan                               PT Bank Pembangunan Daerah Jambi,
             Daerah         Kalimantan           Tengah,                       PT Bank Nagari, PT Bank Pembangunan
             PT     Bank       Pembangunan        Daerah                       Daerah Kalimantan Tengah, PT Bank
             Bali, PT Bank Pembangunan Daerah                                  Pembangunan Daerah Bali, PT Bank
             Sumatera Utara, PT Bank Pembangunan                               Pembangunan Daerah Sumatera Utara,
             Daerah Jawa Tengah, PT Bank Negara                                PT Bank Pembangunan Daerah Jawa
             Indonesia Syariah, PT Bank Jabar Banten                           Tengah, PT Bank Negara Indonesia
             Syariah, PT Bank           Aceh Syariah,                          Syariah, PT Bank Jabar Banten Syariah,
             PT Indonesia Infrastructure Finance,                              PT Bank Aceh Syariah, PT Indonesia
             PT Bank Riau Kepri, Bank Sumsel Babel,                            Infrastructure Finance, PT Bank Riau Kepri,
             PT Pembangunan Daerah Kalimantan                                  Bank Sumsel Babel, PT Pembangunan
             Selatan,    PT      Pembangunan      Daerah                       Daerah           Kalimantan        Selatan,
             Sulawesi Tengah, PT Bank Pembangunan                              PT     Pembangunan       Daerah   Sulawesi
             Daerah Istimewa Yogyakarta Syariah, PT                            Tengah, PT Bank Pembangunan Daerah
             Bank Riau Kepri Syariah dan PT Bank                               Istimewa Yogyakarta Syariah, PT Bank
             Kalsel Syariah.                                                   Riau Kepri Syariah dan PT Bank Kalsel
                                                                               Syariah.

             Jangka waktu kredit investasi dan kredit                          The investment credit and interest during
             interest during construction (IDC) adalah                         construction credit term loan was 162
             162 bulan atau 14 tahun termasuk masa                             months or 14 years including a grac period
             tenggang 24 bulan atau 2 tahun sejak                              of 24 months or 2 years from the effective
             tanggal efektif. Suku bunga yang dikenakan                        date. The interest rate of this loan is 10%
             adalah sebesar 10% per tahun yang                                 p.a which represents the weighted average
             merupakan rata-rata tertimbang atas dasar                         interest rate based on the Reference Rate
                                                           - 154 -
Page 158
PT WASKITA KARYA (PERSERO) Tbk                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                          (Expressed in Rupiah, unless otherwise stated)

           suku bunga yaitu Reference Rate (LPS)                                (LPS) plus Margin.
           ditambah dengan Margin.

           Kedua puluh empat bank tersebut                                      These twenty four banks provided a credit
           memberikan fasilitas kredit maksimum                                 facility with a maximum credit facility limit
           sebesar Rp5.248.541.000.000 yang terdiri                             of Rp5,248,541,000,000 which consists
           dari Kredit Investasi dan Kredit Bunga masa                          of      Investment    Credit and     Interest
           Konstruksi        (IDC)       masing-masing                          During Construction (IDC) amounting
           sebesar       Rp4.919.070.000.000        dan                         to          Rp4,919,070,000,000          and
           Rp329.471.000.000.        Kedua      fasilitas                       Rp329,471,000,000, respectively. Both
           tersebut     diberikan    untuk    keperluan                         facilities are provided for the development
           pembangunan Jalan Tol Ruas Pemalang -                                of Pemalang - Batang Toll Road.
           Batang.

           Pada tanggal 21 Desember 2021,                                       On December 21, 2021, PT Bank Negara
           PT Bank Negara Indonesia Persero (Tbk)                               Indonesia Persero (Tbk) issued a letter No:
           memberikan           surat       dengan                              SSK/3.2/4251 regarding the approval of
           No: SSK/3.2/4251 mengenai Persetujuan                                the change in the projected syndicated
           Perubahan Fasilitas Kredit Sindikasi                                 credit facility for the Pemalang Batang Toll
           proyeksi jalan Tol Ruas Pemalang Batang                              Road with the following terms and
           dengan ketentuan dan persyaratan sebagai                             conditions:
           berikut:

           1.   Project            Cost:           Maksimal                     1.   Project         Cost:            Maximum
                Rp7.406.794.586.675.                                                 Rp7,406,794,586,675.
           2.   Komposisi pembiayaan - Kl - Self                                2.   Financing Material - Kl - Self-financing =
                financing = 74,63% : 25,37%.                                         74.63% : 25.37%.
           3.   Tujuan pembiayaan:                                              3.   Purpose of financing:
                -    Restrukturisasi pinjaman debitur                                -   Debitor credit restructuring used to
                     yang digunakan untuk membiayai                                      finance 74.63% of the investment
                     74,63% Biaya Investasi Proyek                                       costs for the Pemalang - Batang
                     Pembangunan Jalan Tol Ruas                                          Toll Road Construction Project.
                     Pemalang - Batang.
                -    Pembayaran         utang     kontraktor                         -   Payment of contractor debt and/or
                     dan/atau utang BLU dan/atau biaya                                   BLU debt and/or road maintenance
                     pemeliharaan jalan tol sehubungan                                   costs       in     connection   with
                     dengan pengelolaan jalan tol ruas                                   the management of the Pemalang -
                     Pemalang - Batang sepanjang ±                                       Batang toll road along ± 39.2KM
                     39,2 KM (“Proyek”).                                                 (the “Project”).
           4.   Fasilitas pembiayaan : Kredit Investasi                         4.   Financing facilities: Investment Credit
                yang terdiri dari 3 Tranchers yaitu :                                which consists of 3 stages, namely:
                a. Tranche A : pembiayaan investasi                                  a. Tranche
                                                                                             H       A: investment financing
                     dengan skema staging interest                                       with a staging interest scheme
                     (skema bunga berjenjang).                                           (tiered interest scheme).
                b. Tranche B : pembiayaan investasi                                  b. Tranche B : investment financing
                     dengan skema deferred interest                                      with deferred interest scheme
                     (penundaan bunga sebagian).                                         (partial interest deferral).
                c. Tranche C : pembiayaan baru dari                                  c. Tranche C : new financing from SMI
                     SMI Syariah untuk keperluan                                         Syariah for investment purposes
                     pembiayaan        investasi    dengan                               with a profitsharing scheme to
                     skema bagi hasil step up dan                                        increase financing and partly.
                     ditangguhkan sebagian.
           5.   Limit fasititas : Total limit KI dan KI IDC                     5.   Facility limit: The total limit of KI and KI
                maksimal sebesar 74,63% dari Project                                 IDC is a maximum of 74.63% of
                Cost.     Sesuai      outstanding     pokok                          the Project Cost. In accordance with
                pinjaman       sindikasi      dan    adanya                          the principal of the syndicated loan and
                tambahan fasilitas dari SMI Syariah                                  additional facilities from SMI Syariah
                atau            maksimal            sebesar                          or          a          maximum            of
                Rp5.649.094.903.160.                                                 Rp5,649.094,903,160.
           6.   Jangka waktu fasilitas:                                         6.   Term of Facility:
                -    Tranche A dan Tranche B                                         -   Tranche A and Tranche B
                     Maksimal        15      tahun     sejak                             Maximum of 15 years since

                                                               - 155 -
Page 159
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

                    penandatangan           Amendemen                                  the signing of the credit agreement
                    perjanjian kredit atau berakhir pada                               amendment or ending in 2036.
                    tahun 2036.
                -   Tranche C Maksimal 18 tahun                                   -    Tranche C Maximum 18 years from
                    sejak              penandatanganan                                 signing of the Amendment to
                    Amendemen                  perjanjian                              the financing agreement or ending
                    pembiayaan atau berakhir pada                                      in 2039.
                    tahun 2039.
           7.   Grace Period: Tranche C 6 tahun sejak                        7.   Grade Period: Tranche C 6 years from
                di tandatangani perjanjian kredit                                 the signing of the financing credit
                pembiayaan hingga Oktober 2027.                                   agreement until October 2027.
           8.   Masa penarikan: Tranche C 4 tahun                            8.   Withdrawal Period: Tranche C 4 years
                sejak    penandatanganan       perjanjian                         from the signing of the financing
                pembiayaan atau sesuai pembayaran                                 agreement or according to the payment
                utang BLU, dipilih mana yang lebih                                of BLU debt, whichever occurs first.
                dahulu terjadi.
           9.   Suku bunga/ Bagi Hasil:                                      9.   Interest rate/ Profit sharing:
                a. Bunga berjenjang dengan rincian:                               a. Tiered
                                                                                         H interest with details:
                    -   Tahun 2021 sampai dengan                                       -   Year 2021 to 2023 by 5%.
                        2023 sebesar 5%.
                    -   Tahun 2024 sampai dengan                                       -   Year 2024 to 2025 amounting
                        2025 sebesar 6,25% p.a.                                            to 6.25% p.a.
                b. Untuk periode selanjutnya tahun                                b.   ForH the next period from 2026 to
                    2026 sampai dengan 2036 bunga                                      2036 the tiered interest will be
                    berjenjang      menjadi     sebesar                                the Reference Rate+Margin or
                    Reference Rate+Margin atau sama                                    equal to (10.63).
                    dengan (10,63).
       Pinjaman tersebut di atas dijamin dengan                          The above loans are collateralized by all of toll
       seluruh hak konsesi pengusahaan jalan tol,                        road concessions rights, all invoices and
       seluruh tagihan dan pendapatan operational                        operating revenues from toll road management
       dari pengelolaan jalan tol dan usaha usaha lain                   and other business ventures related to toll road
       terkait dengan pengelolaan jalan tol, escrow                      management, escrow accounts, claims for
       account, tagihan atas pendapatan dari hasil                       income from insurance claims, bank guarantee
       klaim asuransi, klaim bank garansi, dan                           claims and reimbursement of       funds     from
       penggantian dana dari pemerintah, gadai                           the government, the shareholders' pledge of
       saham milik pemegang saham, serta Company                         shares, and the Company guarantee of
       guarantee dari para pemegang saham.                               the shareholders. The loan agreement also
       Perjanjian pinjaman juga mencakup persyaratan                     covers certain requirements such as: limiting
       tertentu antara lain: membatasi hak Perusahaan                    the Company's right to obtain new credits/
       untuk     memperoleh      kredit/fasilitas   baru,                facilities, changing shareholder structure,
       mengubah       sususan     pemegang        saham,                 making changes to the PPJT and/or business
       melakukan perubahan PPJT dan atau business                        plan. and requires the Company to maintain
       plan, serta mengharuskan Perusahaan untuk                         certain financial ratios calculated based on
       mempertahankan rasio keuangan tertentu yang                       the Company financial statement.
       dihitung    berdasarkan     laporan      keuangan
       Perusahaan.

       Pembatasan penting dalam perjanjian pinjaman                      The major covenant of this financing include
       sindikasi adalah:                                                 the following:
       •   Debt to equity ratio (DER) maksimal 3,5                       •   Debt to equity ratio (DER) a maximum of
           kali.                                                             3.5 times
       •   Debt service coverage ratio (DSCR) lebih                      •   Debt service coverage ratio (DSCR) more
           dari 1,0 (satu koma nol) kali selama masa                         than 1.0 (one point zero) times during
           operasi.                                                          the operational period.
       •   Debt service coverage ratio (DSCR)                            •   Debt service coverage ratio (DSCR) is at
           minimal 100% mulai tahun 2022. Jika                               least 100% starting in 2022. If the DSCR is
           DSCR kurang dari 1 kali dan pemegang                              less than 1 time and the shareholders top
           saham melakukan top up atau terdapat                              up or there is a cash balance at the end of
           saldo kas akhir tahun sebelumnya sehingga                         the previous year so that the debtor does
           Debitur tidak mengalami keterlambatan                             not experience delays in payment of
           pembayaran kewajiban, maka debitur tidak                          obligations, then the debtor is not

                                                            - 156 -
Page 160
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

            dianggap melakukan pelanggaran covenant                          considered to have violated the DSCR
            DSCR.                                                            covenant.
       •    Menjaga ekuitas selalu positif.                             •    Maintain positif balance of equity.
       b.   WBW                                                         b.   WBW
            Berdasarkan akta perjanjian kredit sindikasi                     Based on the syndicated credit agreement
            No.53, tanggal 21 Desember 2018, WBW                             deed No. 53, dated December 21, 2018,
            telah menandatangani perjanjian Kredit                           WBW entered into Loan Syndication with
            Sindikasi dengan PT Bank Negara                                  PT Bank Negara Indonesia (Persero) Tbk,
            Indonesia (Persero) Tbk, PT Bank Rakyat                          PT Bank Rakyat Indonesia (Persero) Tbk,
            Indonesia (Persero) Tbk, PT Sarana Multi                         PT Sarana Multi Infrastruktur (Persero),
            Infrastruktur  (Persero),     PT      Bank                       PT Bank Pembangunan Daerah Jawa Timur
            Pembangunan Daerah Jawa Timur Tbk, PT                            Tbk, PT Bank Pembangunan          Daerah
            Bank Pembangunan Daerah Riau Kepri, PT                           Riau Kepri, PT Bank Pembangunan Daerah
            Bank      Pembangunan     Daerah      Nusa                       Nusa       Tenggara    Timur, PT    Bank
            Tenggara Timur, PT Bank Pembangunan                              Pembangunan Daerah            Maluku and
            Daerah Maluku dan Maluku Utara, PT Bank                          Maluku Utara, PT Bank Pembangunan
            Pembangunan Daerah Kalimantan Selatan,                           Daerah           Kalimantan      Selatan,
            PT Bank Pembangunan Daerah Sumatera                              PT Bank Pembangunan Daerah Sumatera
            Selatan dan Bangka Belitung, PT Bank                             Selatan dan Bangka Belitung, PT Bank
            Pembangunan Daerah Kalimantan Barat,                             Pembangunan Daerah Kalimantan Barat,
            PT Bank Pembangunan Daerah Bengkulu,                             PT Bank Pembangunan Daerah Bengkulu,
            PT Bank Pembangunan Daerah Bali, PT                              PT Bank Pembangunan Daerah Bali,
            Pembangunan Daerah Bank Papua, PT                                PT Pembangunan Daerah Bank Papua,
            Bank CIMB Niaga Tbk Unit usaha Syariah,                          PT Bank CIMB Niaga Tbk Business Unit
            dan PT Bank Pembangunan Daerah Jawa                              Syariah, and PT Bank Pembangunan
            Timur Tbk Unit Usaha Syariah dan                                 Daerah Jawa Timur Tbk Business Unit
            Lembaga keuangan non bank lainnya.                               Syariah and other non banking financial
                                                                             institution.
            Berdasarkan akta No. 49 dan No. 50                               Based on deed No. 49 and No. 50 dated
            tanggal 30 Agustus 2018 oleh H. Bambang                          August 30, 2018 by H. Bambang Suprianto,
            Suprianto, S.H., SpN., MH, WBW telah                             S.H., SpN., MH, WBW entered into Loan
            menandatangani perjanjian Kredit dengan                          Agreement with PT Bank Tabungan Negara
            PT Bank Tabungan Negara (Persero) Tbk.                           (Persero) Tbk. These banks provided a
            Bank tersebut memberikan fasilitas kredit                        credit        Working      Capital      Loan
            sebesar       Rp400.000.000.000      dan                         Rp400,000,000,000 and maximum credit
            maksimum sebesar Rp1.125.000.000.000                             facility limit of Rp1,125,000,000,000. There
            yang merupakan Kredit Modal Kerja (KMK).                         facilities are provided for the land
            Fasilitas   tersebut   diberikan    untuk                        acquisition bailout for the development of
            pembiayaan dana talangan pengadaan                               Krian-Legundi Bunder-Manyar (KLBM).
            tanah proyek Jalan Tol Krian-Legundi-
            Bunder-Manyar (KLBM).
            Jangka waktu Kredit Modal Kerja (KMK)                            A credit term loan of 24 months from dated
            adalah    24     bulan    sejak    tanggal                       of Signing of a credit agreement. The
            penandatangan perjanjian kredit. Suku                            interest rate of this loan is 8.25% effective
            bunga efektif per tahun adalah 8,25% dan                         p.a -adjustable rate. Based on the letter
            dapat disesuaikan. Berdasarkan surat dari                        from PT Bank Tabungan Negara (Persero)
            PT Bank Tabungan Negara (Persero) Tbk                            Tbk dated June 28, 2019 interest rates
            tanggal 28 Juni 2019 suku bunga kredit                           adjusted to 8.50%.
            disesuaikan menjadi 8,50%.
            Berdasarkan Akta No. 12 tanggal                                  Based     on    Deed     No.      12    date
            29 Desember 2020 oleh notaris Gamal                              December 29, 2020 by notary Gamal
            Wahidin,     S.H.,   Perusahaan      telah                       Wahidin, SH., the Company has signed a
            menandatangani perjanjian Kredit dengan                          credit agreement with PT Bank Tabungan
            PT Bank Tabungan Negara (Persero) Tbk.                           Negara (Persero) Tbk. The bank provides a
            Bank tersebut memberikan fasilitas kredit                        revolving       credit      facility       of
            revolving sebesar Rp250.000.000.000 dan                          Rp250,000,000,000 and maximum of
            maksimum sebesar Rp368.000.000.000                               Rp368,000,000,000 which is a Working
            yang merupakan Kredit Modal Kerja (KMK).                         Capital Credit (KMK). There facilities are
            Fasilitas   tersebut   diberikan    untuk                        provided for the land acquisition bailout for
                                                           - 157 -
Page 161
PT WASKITA KARYA (PERSERO) Tbk                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                        (Expressed in Rupiah, unless otherwise stated)

             pembiayaan dana talangan pengadaan                                 the development of Krian-Legundi-Bunder-
             tanah proyek Jalan Tol Krian-Legundi-                              Manyar (KLBM).
             Bunder-Manyar (KLBM).
             Jangka waktu Kredit Modal Kerja (KMK)                              Working Capital Credit (KMK) is 24 months
             adalah    24     bulan    sejak    tanggal                         from he date of signing the credit
             penandatangan perjanjian kredit. Suku                              agreement. Effective interest rate per year
             bunga efektif per tahun adalah 8,75% dan                           is 8.75% and in the event of arrears, a fine
             apabila terjadi penunggakan dikenakan                              of 2% is imposed above the prevailing credit
             denda 2% diatas suku bunga kredit yang                             interest rate.
             berlaku.
   2.   PT Bank Rakyat Indonesia (Persero) Tbk                        2.   PT Bank Rakyat Indonesia (Persero) Tbk
        WBW                                                                WBW
             WBW telah menandatangani perjanjian                                WBW obtained a syndication loan
             Kredit Sindikasi dengan PT Bank Rakyat                             agreement with PT Bank Rakyat Indonesia
             Indonesia (Persero) Tbk dan lembaga                                (Persero) Tbk and other banking and non
             keuangan perbankan dan non perbankan                               banking financial institutions.
             lainnya.

   3.   PT Bank BNI Syariah                                           3.   PT Bank BNI Syariah
        PBTR                                                               PBTR
             PBTR telah menandatangani perjanjian                               PBTR obtained a syndication loan
             Kredit Sindikasi dengan PT Bank BNI                                agreement with PT Bank BNI Syariah and
             Syariah dan lembaga keuangan perbankan                             other banking financial institutions.
             lainnya.
   4.   PT Bank Mandiri Syariah                                       4.   PT Bank Mandiri Syariah
        a.   Kredit Bank Sindikasi TJPJT                                   a.   Syndication Bank Credit TJPJT
             Berdasarkan Akta No. 3 dan 4 tanggal 5                             Based on Deed No. 3 and 4 dated October
             Oktober 2018 oleh Efran Yuniarto, S.H.,                            5, 2018 by Efran Yuniarto, S.H., M.Kn.,
             M.Kn., Notaris di Jakarta, TJPJT dan PT                            Notary in Jakarta, TJPJT and PT Sarana
             Sarana Multi Infrastruktur (Persero) - Unit                        Multi Infrastruktur (Persero) - Unit Usaha
             Usaha Syariah, PT Bank Syariah Mandiri,                            Syariah, PT Bank Syariah Mandiri, PT Bank
             PT Bank BPD Jawa Timur - Unit Usaha                                BPD Jawa Timur - Unit Usaha Syariah,
             Syariah, PT Bank Mega Syariah, PT Bank                             PT Bank Mega Syariah, PT Bank BJB
             BJB Syariah menandatangani Perjanjian                              Syariah entered into Loan Agreement
             Kredit dengan fasilitas kredit maksimum                            providing loan facilities with ceiling
             sebesar Rp1.293.201.000.000. Fasilitas                             of Rp1,293,201,000,000. Loan facilities are
             tersebut   diberikan      untuk    keperluan                       provided for development of Pasuruan -
             pembangunan Jalan Tol Ruas Pasuruan -                              Probolinggo Toll Road.
             Probolinggo.
             Pinjaman ini dikenakan bunga sebesar 11%                           This loan bears interest at 11% per annum
             per tahun untuk Tranche A1.                                        for Tranche A1.
             Pinjaman tersebut di atas dijamin dengan                           The above loans are collateralized by all
             seluruh hak konsesi pengusahaan jalan tol,                         of toll road concessions rights, all invoices
             seluruh     tagihan     dan       pendapatan                       and operating revenues from toll road
             operasional dari pengelolaan jalan tol dan                         management and other business ventures
             usaha-usaha        lain   terkait     dengan                       related to toll road management, escrow
             pengelolaan jalan tol, escrow account,                             accounts, claims for income from insurance
             tagihan atas pendapatan dari hasil klaim                           claims, bank guarantee claims and
             asuransi, klaim bank garansi, penggantian                          reimbursement        of     funds        from
             dana dari pemerintah, gadai saham milik                            the government, the shareholders’ pledge
             pemegang saham, serta Company gurantee                             of shares, and the Company gurantee
             dari para pemegang saham. Perjanjian                               of the shareholders. The loan agreement
             pinjaman juga mencakup persyaratan                                 also covers certain requirements such as:
             tertentu antara lain:


                                                            - 158 -
Page 162
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

           •   Membatasi hak Perusahaan untuk                                 •   Limiting the Company's right to obtain
               memperoleh kredit/ fasilitas baru,                                 new     credits/   facilities, changing
               mengubah susunan pemegang saham,                                   shareholder struture, making changes
               melakukan perubahan PPJT dan atau                                  to the PPJT and or business plan and
               business plan, serta mengharuskan                                  requires TJPJT to maintain certain
               TJPJT untuk mempertahankan rasio                                   financial ratios calculated based on
               keuangan tertentu yang dihitung                                    TJPJT financial statement.
               berdasarkan laporan keuangan TJPJT.

           •   Pembatasan penting dalam perjanjian                            •   The major covenant of this financing
               pinjaman ini adalah:                                               include the following:
               a.   Debt to equity ratio (DER)                                    a.   Debt to equity ratio (DER) reflecting
                    mencerminkan rasio pembiayaan                                      the ratio of bank financing and self
                    bank dan self financing dengan                                     financing with the composition of
                    komposisi 60:40. Dan Perusahaan                                    60:40. And the Company must
                    harus menjaga seluruh posisi DER                                   maintain all DER position not
                    tidak lebih besar dari 500%, jika                                  greater than 500%, if DER is
                    DER lebih besar dari 500% maka                                     greater than 500%, the Company
                    Perusahaan      harus   melakukan                                  must increase the additional capital
                    penambahan         modal        atau                               paid up or reduce/repay the debt.
                    pengurangan/ pembayaran hutang.
               b.   Debt service coverage ratio                                   b.   Debt service coverage ratio
                    (DSCR) lebih dari 1,0 (satu koma                                   (DSCR) above 1.0 (one point zero)
                    nol) kali selama masa operasi.                                     times during the operation period.
               c.   Menjaga ekuitas selalu positif.                               c.   Maintain positif balance of equity.
               d.   Rasio modal disetor terhadap total                            d.   The ratio of paid up capital to
                    utang di bank minimal sebesar                                      the total debt in bank is minimum
                    10%.                                                               10%.
   Pihak Ketiga                                                      Third Parties
   a.   PBTR                                                         a.   PBTR
        Berdasarkan Akta Notaris No. 37 tanggal                           Based on Notarial Deed No.37 dated
        24 Mei 2017 oleh Ariani Lakhsmijati Rachim,                       May 24, 2017 by Ariani Lakhsmijati Rachim
        S.H., Notaris di Jakarta, Perusahaan telah                        S.H., Notary in Jakarta, the Company entered
        menandatangani perjanjian Kredit Sindikasi                        into Loan Syndication with PT Bank Negara
        dengan PT Bank Negara Indonesia (Persero)                         Indonesia (Persero) Tbk, PT Bank Panin
        Tbk, PT Bank Panin Indonesia Tbk,                                 Indonesia Tbk, PT Bank ICBC Indonesia,
        PT         Bank         ICBC       Indonesia,                     PT Bank Pembangunan Daerah Sulawesi
        PT Bank Pembangunan Daerah Sulawesi                               Selatan dan Sulawesi Barat, PT Bank Arta
        Selatan dan Sulawesi Barat, PT Bank Arta                          Graha       Internasional     Tbk,     PT     Bank
        Graha     Internasional    Tbk,   PT    Bank                      Pembangunan Daerah Maluku dan Maluku
        Pembangunan Daerah Maluku dan Maluku                              Utara, PT Bank Pembangunan Daerah Daerah
        Utara, PT Bank Pembangunan Daerah Daerah                          Istimewa Yogyakarta, PT Bank Pembangunan
        Istimewa Yogyakarta, PT Bank Pembangunan                          Daerah Jambi, PT Bank Nagari, PT Bank
        Daerah Jambi, PT Bank Nagari, PT Bank                             Pembangunan Daerah Kalimantan Tengah,
        Pembangunan Daerah Kalimantan Tengah                              PT Bank Pembangunan Daerah Bali, PT Bank
        PT Bank Pembangunan Bali, PT Bank                                 Pembangunan         Daerah     Sumatera     Utara,
        Pembangunan       Daerah    Sumatera   Utara,                     PT Bank Pembangunan Daerah Jawa Tengah,
        PT Bank Pembangunan Daerah Jawa Tengah,                           PT Bank Negara Indonesia Syariah, PT Bank
        PT Bank Negara Indonesia Syariah, PT Bank                         Jabar Banten Syariah dan PT Bank Aceh
        Jabar Banten Syariah dan PT Bank Aceh                             Syariah. These sixteen banks are providing a
        Syariah. Keenam belas bank tersebut                               credit facility with a credit ceiling of
        memberikan fasilitas kredit maksimum sebesar                      Rp3,220,000,000,000        which     consists    of
        Rp3.220.000.000.000 yang terdiri dari kredit                      investment      credit    and    interest   during
        investasi dan kredit bunga masa konstruksi                        construction amounting to Rp3,006,150,000,000
        Rp3.006.150.000.000      masing-masing   dan                      and Rp213,850,000,000 respectively. Both
        Rp213.850.000.000. Kedua fasilitas tersebut                       facilities are provided for the development of
        diberikan untuk keperluan pembangunan Jalan                       Pemalang - Batang Toll Road.
        Tol Ruas Pemalang - Batang.


                                                           - 159 -
Page 163
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


   b.   WBW                                                          b.   WBW

        Berdasarkan akta perjanjian kredit sindikasi                      Based on the syndicated credit agreement deed
        No. 53, tanggal 21 Desember 2018, WBW telah                       No. 53, dated December 21, 2018, WBW
        menandatangani perjanjian Kredit Sindikasi                        entered into Loan Syndication with PT Bank
        dengan PT Bank Negara Indonesia (Persero)                         Negara Indonesia (Persero) Tbk, PT Bank
        Tbk, PT Bank Rakyat Indonesia (Persero) Tbk,                      Rakyat Indonesia (Persero) Tbk, PT Sarana
        PT Sarana Multi Infrastruktur (Persero)                           Multi   Infrastruktur    (Persero),     PT Bank
        PT Bank Pembangunan Daerah Jawa Timur                             Pembangunan Daerah Jawa Timur Tbk,
        Tbk, PT Bank Pembangunan Daerah Riau                              PT Bank Pembangunan Daerah Riau Kepri,
        Kepri, PT Bank Pembangunan Daerah Nusa                            PT Bank Pembangunan Daerah Nusa Tenggara
        Tenggara Timur, PT Bank Pembangunan                               Timur, PT Bank Pembangunan Daerah Maluku
        Daerah Maluku dan Maluku Utara, PT Bank                           and Maluku Utara, PT Bank Pembangunan
        Pembangunan Daerah Kalimantan Selatan,                            Daerah Kalimantan Selatan, PT Bank
        PT Bank Pembangunan Daerah Sumatera                               Pembangunan Daerah Sumatera Selatan dan
        Selatan dan Bangka Belitung, PT Bank                              Bangka Belitung, PT Bank Pembangunan
        Pembangunan Daerah Kalimantan Barat,                              Daerah      Kalimantan       Barat,   PT   Bank
        PT Bank Pembangunan Daerah Bengkulu,                              Pembangunan Daerah Bengkulu, PT Bank
        PT    Bank    Pembangunan     Daerah    Bali,                     Pembangunan Daerah Bali, PT Pembangunan
        PT Pembangunan Daerah Bank Papua,                                 Daerah Bank Papua, PT Bank CIMB Niaga Tbk
        PT Bank CIMB Niaga Tbk Unit usaha Syariah,                        Business         Unit          Syariah,     and
        dan PT Bank Pembangunan Daerah Jawa                               PT Bank Pembangunan Daerah Jawa Timur
        Timur Tbk Unit Usaha Syariah dan Lembaga                          Tbk Business Unit Syariah and other non
        keuangan non bank lainnya.                                        banking financial institution.

        Berdasarkan Akta Notaris Perjanjian Kredit                        Based on the Syndicated Credit Agreement
        Sindikasi No. 45 tanggal 21 Desember 2018                         Notarial Deed No.45 dated December 21, 2018
        oleh Ariani L. Rachim, S.H., Notaris di Jakarta                   by Ariani L.Rachim, S.H., a Notary in Jakarta
        yang dinyatakan kembali berdasarkan akta                          which was restated based on the deed of
        Pernyataan Kembali atas Perjanjian Kredit                         Restatement of the Syndicated Credit
        Sindikasi No. 30 tanggal 26 Pebruari 2019 oleh                    Agreement No.30 dated February 26, 2019 by
        Ariani L. Rachim, S.H., Notaris di Jakarta, CTP                   Ariani L. Rachim, S.H., a Notary in Jakarta, CTP
        telah    menandatangani     Perjanjian    Kredit                  entered into a Loan Syndicated with PT Bank
        Sindikasi dengan PT Bank Rakyat Indonesia                         Rakyat Indonesia (Persero) Tbk, PT Bank
        (Persero) Tbk, PT Bank Mandiri (Persero) Tbk,                     Mandiri (Persero) Tbk, PT Sarana Multi
        PT Sarana Multi Infrastruktur (Persero) Tbk,                      Infrastruktur (Persero) Tbk, PT Bank CIMB
        PT Bank CIMB Niaga Tbk, PT Bank Negara                            Niaga Tbk, PT Bank Negara Indonesia
        Indonesia (Persero) Tbk, PT Bank Pan                              (Persero) Tbk, PT Bank Pan Indonesia Tbk,
        Indonesia Tbk, PT Bank Pembangunan Daerah                         PT Bank Pembangunan Daerah Jawa Timur
        Jawa Timur Tbk, dan PT Bank DKI.                                  Tbk, and PT Bank DKI.

   c.   WTTR                                                         c.   WTTR

        Berdasarkan Akta No. 3 tanggal 5 Oktober 2018                     Based on Deed No. 3 dated October 5, 2018 by
        oleh Efran Yuniarto, S.H., M.Kn., Notaris di                      Efran Yuniarto, S.H., M.Kn., Notary in Jakarta,
        Jakarta, WTTR dan PT Sarana Multi                                 WTTR and PT Sarana Multi Infrastruktur
        Infrastruktur (Persero) - Unit Usaha Syariah,                     (Persero) - Unit Usaha Syariah, PT Bank
        PT Bank Syariah Mandiri, PT Bank BPD Jawa                         Syariah Mandiri, PT Bank BPD Jawa Timur -
        Timur - Unit Usaha Syariah, PT Bank Mega                          Unit Usaha Syariah, PT Bank Mega Syariah,
        Syariah, PT Bank BJB Syariah menandatangani                       PT Bank BJB Syariah entered into Loan
        Perjanjian Kredit dengan fasilitas kredit                         Agreement providing loan facilities with ceiling
        maksimum       sebesar    Rp1.293.201.000.000.                    of Rp1,293,201,000,000. Loan facilities are
        Fasilitas tersebut diberikan untuk keperluan                      provided for development of Pasuruan -
        pembangunan Jalan Tol Ruas Pasuruan -                             Probolinggo Toll Road.
        Probolinggo.




                                                           - 160 -
Page 164
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   Entitas Anak - WKR                                               Subsidiary - WKR

   Pihak Berelasi                                                   Related Parties

   PT Bank Tabungan Negara (Persero) Tbk.                           PT Bank Tabungan Negara (Persero) Tbk.

   KMK Bridging Loan                                                KMK Bridging Loan

   Pada tanggal 22 Februari 2021, Perusahaan                        On February 22, 2021, the Company obtained
   menandatangani kontrak perjanjian No. 17 dengan                  contract agreement No.17 with PT Bank Tabungan
   PT Bank Tabungan Negara (Persero) Tbk terkait                    Negara (Persero) Tbk related to loan facility
   dengan         fasilitas      pinjaman      sebesar              amounting to Rp275,000,000,000. This loan facility
   Rp275.000.000.000.        Fasilitas  pinjaman    ini             is Bridging Loan Facility for will be used specifically
   merupakah       fasilitas  Bridging    Loan   untuk              for        debt     refinancing. On February 2022,
   pembayaran hutang. Pada Februari 2022,                           the Company obtained approval for extension of
   Perusahaan memperoleh persetujuan perpanjangan                   the facility periods are 36 months with a maturity
   periode fasilitas menjadi 36 bulan dengan jatuh                  date till February 22, 2025.
   tempo 22 Februari 2025.

   Perjanjian ini telah addendum tanggal 29 Desember                This     aggrement         has      amandment        on
   2022 pada perjanjian kredit No. 114, memperoleh                  December 29, 2022 based on contract aggrement
   persetujuan perpanjangan periode fasilitas menjadi               No. 114, the Company obtained approval for
   36 bulan dengan jatuh tempo 22 Februari 2025                     extension of the facility periods are 36 months with a
   dengan tingkat suku bunga 9,50% per tahun.                       maturity date till February 22, 2025 with interest rate
                                                                    of 9.50% per annum.

   Berdasarkan Akta No. 256 Adendum II tanggal 28                   Based on Deed no. 256 Addendum II dated July 28,
   Juli 2023, Perusahaan telah mendapatkan                          2023, the Company has received approval for
   persetujuan restrukturisasi dengan fasilitas kredit              restructuring with a credit facility provided of
   yang diberikan Rp250.000.000.000. Jangka waktu                   Rp250,000,000,000. The facility term has been
   fasilitas diperpanjang 76 bulan dan penurunan suku               extended by 76 months and the credit interest rate
   bunga kredit menjadi 6% s.d tahun 2026. Terhadap                 has been reduced to 6% until 2026. The principal
   agunan tersebut diberlakukan pengikatan secara                   collateral is subject to binding by Cross Collateral,
   Cross Collateral, Cross RPC dan Cross Default.                   Cross RPC and Cross Default.

   KMK Kemitraan                                                    KMK Kemitraan

   Pada tanggal 21 Februari 2020, Perusahaan                        On February 21, 2020, the Company signed contract
   menandatangani kontrak perjanjian No. 5 dengan                   agreement No. 5 with PT Bank Tabungan Negara
   PT Bank Tabungan Negara (Persero) Tbk terkait                    (Persero) Tbk regarding a revolving loan facility of
   dengan        fasilitas     pinjaman     sebesar                 Rp100,000,000,000. This loan facility is used for the
   Rp100.000.000.000 bersifat revolving. Fasilitas                  distribution of Partnership Pattern Working Capital
   pinjaman    ini    digunakan    untuk Penyaluran                 Credit Facilities with a loan facility term of 36 months
   Pemberian Fasilitas Kredit Modal Kerja Pola                      after signing the contract agreement with an interest
   Kemitraan dengan jangka waktu fasilitas pinjaman                 rate of 9.50% per year.
   adalah 36 bulan setelah penandatanganan kontrak
   perjanjian dengan tingkat suku bunga 9,50% per
   tahun.

   KMK Nines                                                        KMK Nines

   Pada     tanggal     14  Agustus      2020,   WKR                On August 14, 2020, WKR entered contract
   menandatangani kontrak perjanjian No. 1 dengan                   agreement No. 1 with PT Bank Tabungan Negara
   PT Bank Tabungan Negara (Persero) Tbk terkait                    (Persero) Tbk related to loan facility amounting to
   dengan        fasilitas      pinjaman       sebesar              Rp400,000,000,000. This loan facility will be used
   Rp400.000.000.000. Fasilitas pinjaman ini hanya                  specifically for the construction of unit of apartment
   dapat digunakan untuk pembiayaan konstruksi                      in Vasaka Nines Project, in BSD-Banten. with term
   pembangunan unit apartemen di proyek Vasaka                      of 60 months after signing contract with interest rate
   Nines, di BSD-Banten dengan jangka waktu fasilitas               of 9.90% per annum. The credit facilities are
   pinjaman adalah 60 bulan setelah penandatanganan                 secured by land square of 8.922 m2 located on
   kontrak perjanjian dengan tingkat suku bunga 9,90%               project development of Vasaka Nines BSD and
   per tahun. Pinjaman tersebut dijamin dengan tanah                cessie of unit apartment from customers.
   seluas 8.922 m2 di lokasi proyek pembangunan
   Vasaka Nines BSD dan agunan pokok kredit unit
                                                          - 161 -
Page 165
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

   apartemen dengan asuransi kerugian.

   Berdasarkan Akta No. 259 Adendum I tanggal 28                   Based on Deed no. 259 Addendum I dated July 28,
   Juli 2023, Perusahaan telah mendapatkan                         2023, the Company has received approval for
   persetujuan restrukturisasi dengan fasilitas kredit             restructuring with a credit facility provided of
   yang diberikan Rp344.846.000.000. Jangka waktu                  Rp344,846,000,000. The facility term has been
   fasilitas diperpanjang 58 bulan dan penurunan suku              extended by 58 months and the credit interest rate
   bunga kredit menjadi 6% sampai dengan tahun                     has been reduced to 6% until 2026. There is
   2026. Terdapat agunan tambahan atas pinjaman                    additional collateral for the loan in the form of Land
   tersebut berupa Tanah Vasaka Soltera SHGB No.                   Vasaka Soltera SHGB No. 00821/West Pejaten with
   00821/Pejaten Barat dengan luas 495 m2. Terhadap                an area of 495 m2. The principal collateral is subject
   agunan tersebut diberlakukan pengikatan secara                  to binding by Cross Collateral, Cross RPC and
   Cross Collateral, Cross RPC dan Cross Default.                  Cross Default.

   KMK 88 Avenue                                                   KMK 88 Avenue

   Pada tanggal 29 Mei 2017, WKR menandatangani                    On May 29, 2017, WKR entered contract agreement
   kontrak perjanjian No. 53 dengan PT Bank                        No. 53 with PT Bank Tabungan Negara (Persero)
   Tabungan Negara (Persero) Tbk terkait dengan                    Tbk related to loan facility amounting to
   fasilitas pinjaman sebesar Rp300.000.000.000.                   Rp300,000,000,000. This loan facility will be used
   Fasilitas pinjaman ini hanya dapat digunakan untuk              specifically for the construction of hardcost
   pembiayaan konstruksi hardcost pembangunan                      development of SOHO and Apartment 88 Avenue,
   SOHO dan Apartemen 88 Avenue, proyek KSO                        owned by KSO Waskita - Darmo, in Surabaya with
   Waskita - Darmo, di Surabaya dengan jangka waktu                term of 60 months after signing contract with interest
   fasilitas pinjaman adalah 60 bulan setelah                      rate of 9.75% per annum. The credit facilities are by
   penandatanganan kontrak perjanjian dengan tingkat               land and building owned by KSO Waskita - Darmo.
   suku bunga 9,75% per tahun. Pinjaman tersebut
   dijamin dengan tanah dan bangunan yang ada
   diatasnya milik KSO Waskita - Darmo.
   Perjanjian ini telah addendum tanggal 27 April 2022             This aggrement has amandment on April 27 2022
   pada perjanjian kredit No.15, WKR memperpanjang                 based on contract aggrement No.15, WKR extended
   fasilitas dengan jangka waktu 24 bulan dengan                   the facility with obtained approval for extension of
   fasilitas pinjaman sebesar Rp190.000.000.000.                   the facility periods are 24 months with oustanding
                                                                   plafond amounting Rp190,0000,000,000

   Berdasarkan Akta No. 257 Adendum III tanggal 28                 Based on Deed no. 257 Addendum III dated July 28,
   Juli 2023, Perusahaan telah mendapatkan                         2023, the Company has received approval for
   persetujuan restrukturisasi dengan fasilitas kredit             restructuring with a credit facility provided of
   yang diberikan Rp178.000.000.000. Jangka waktu                  Rp178,000,000,000. The facility term has been
   fasilitas diperpanjang 55 bulan dan penurunan suku              extended by 55 months and the credit interest rate
   bunga kredit menjadi 6% sampai dengan tahun                     has been reduced to 6% until 2026. The principal
   2026.      Terhadap     agunan    pokok    tersebut             collateral is subject to binding by Cross Collateral
   diberlakukan pengikatan secara Cross Collateral                 and Cross RPC.
   dan Cross RPC.
   KMK Reiz Condo                                                  KMK Reiz Condo
   Pada tanggal 18 Desember 2017, WKR                              On December 18, 2017, WKR entered contract
   menandatangani kontrak per janjian No. 28 dengan                agreement No. 28 with PT Bank Tabungan Negara
   PT Bank Tabungan Negara (Persero) Tbk terkait                   (Persero) Tbk related to loan facility amounting to
   dengan      fasilitas      pinjaman      sebesar                Rp340,000,000,000. This loan facility will be used
   Rp340.000.000.000. Fasilitas pinjaman ini hanya                 specifically for the construction of 610 units of
   dapat digunakan untuk pembiayaan konstruksi                     apartment in The Reiz Condo Project owned
   pembangunan 610 unit apartemen di proyek The                    PT Waskita Karya Realty, in Medan.
   Reiz Condo PT Waskita Karya Realty, di Medan.

   Saldo pokok terutang dari fasilitas ini sebesar                 The outstanding principal balance amounting to
   Rp340.000.000.000 dengan jangka waktu penarikan                 Rp340,000,000,000 with term of withdrawal 60
   fasilitas pinjaman adalah 60 bulan setelah                      months after signing contract with interest rate of
   penandatanganan kontrak perjanjian dengan tingkat               9.25 % per annum. The credit facilities are secured
   suku bunga 9,25 % per tahun. Pinjaman tersebut                  by land square of 7,856 m2 located on project
   dijamin dengan tanah seluas 7.856 m2 di lokasi                  development of The Reiz Condo Medan and cessie
   proyek pembangunan The Reiz Condo Medan dan                     of unit apartment from customers.

                                                         - 162 -
Page 166
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

   agunan pokok kredit       unit   apartemen   dengan
   asuransi kerugian.
   Perjanjian  ini  telah    addendum       tanggal                  This     aggrement   has     amandment      on
   29 Desember 2022 pada perjanjian kredit No. 114,                  December 29, 2022 based on contract aggrement
   Perusahaan memperpanjang fasilitas dengan jangka                  No. 114, The Company extended the facility with
   waktu.                                                            obtained approval for extension of the facility
                                                                     periods.
   Berdasarkan Akta No. 258 Adendum III tanggal 28                   Based on Deed no. 258 Addendum III dated July 28,
   Juli 2023, Perusahaan telah mendapatkan                           2023, the Company has received approval for
   persetujuan restrukturisasi dengan fasilitas kredit               restructuring with a credit facility provided of
   yang diberikan Rp110.300.000.000. Jangka waktu                    Rp110,300,000,000. The facility term has been
   fasilitas diperpanjang 45 bulan dan penurunan suku                extended by 45 months and the credit interest rate
   bunga kredit menjadi 6% s.d tahun 2026. Terhadap                  has been reduced to 6% until 2026. The principal
   agunan pokok tersebut diberlakukan pengikatan                     collateral is subject to binding by Cross Collateral
   secara Cross Collateral dan Cross RPC.                            and Cross RPC.

   WFPR                                                              WFPR

   Pada     tanggal     15 Januari   2020,     WFPR                  On January 15, 2020, WFPR entered contract
   menandatangani kontrak perjanjian No. 41 dengan                   agreement No. 41 with PT Bank Tabungan Negara
   PT Bank Tabungan Negara (Persero) Tbk terkait                     (Persero) Tbk related to loan facility amounting to
   dengan        fasilitas    pinjaman        sebesar                Rp258,000,000,000. This loan facility will be used
   Rp258.000.000.000. Fasilitas pinjaman ini hanya                   specifically for the construction of unit of apartment
   dapat digunakan untuk pembiayaan konstruksi                       in Vasaka Solterra Project owned PT Waskita Fim
   pembangunan unit apartemen di proyek Vasaka                       Perkasa Realti, in Pejaten Jakarta with term of 60
   Solterra PT Waskita Fim Perkasa Realti, di Pejaten                months after signing contract with interest rate of
   Jakarta dengan jangka waktu fasilitas pinjaman                    9.50% per annum.
   adalah 60 bulan setelah penandatanganan kontrak
   perjanjian dengan tingkat suku bunga 9,50% per
   tahun.

   Pada tanggal 21 Oktober 2020, Perusahaan                          On October 21, 2020, the Company signed an
   menandatangani kontrak perjanjian No. 63 dengan                   agreement contract No. 63 with PT Bank Tabungan
   PT Bank Tabungan Negara (Persero) Tbk terkait                     Negara (Persero) Tbk related to the addition of the
   dengan penambahan plafond fasilitas pinjaman                      loan facility ceiling of Rp58,000,000,000. The total
   sebesar Rp58.000.000.000. Sehingga total kredit                   principal debt amounted to Rp258,000,000,000. This
   sebesar Rp258.000.000.000. Fasilitas pinjaman ini                 loan facility is used to finance the construction of
   digunakan untuk pembiayaan pembangunan                            apartments and commercial areas of Tower Mid
   apartemen dan commercial area Tower Mid (Tower                    (Tower Vasaka Residence) in Jakarta Selatan. This
   Vasaka Residence) di Jakarta Selatan. Perjanjian ini              aggrement has amandment on May 11, 2023 based
   telah addendum tanggal 11 Mei 2023 pada                           on contract aggrement No. 60, the WFPR obtained
   perjanjian kredit No. 60, WFPR memperoleh                         approval for extension of the facility periods with a
   persetujuan perpanjangan periode fasilitas dengan                 maturity date till January 15, 2027 with interest rate
   jatuh tempo 15 Januari 2027 dengan tingkat suku                   9,5% per annum.
   bunga 9,50% per tahun.

   Pada tanggal 4 April 2024, Perusahaan telah                       As of April 4, 2024, The Company has restructured
   merestrukturisasi jatuh tempo fasilitas ini hingga 15             due date of this facility until June 15, 2029 with
   Juni 2029 dengan tingkat suku bunga berubah                       interest rate at 6% per annum till 2025, 7,5% per
   menjadi 6% per tahun s.d Tahun 2025, 7,5% per                     annum on 2026-2027, 7,75% per annum on 2028
   tahun pada Tahun 2026-2027, 7,75% per tahun                       and 7,5% per annum on 2029.
   pada Tahun 2028 dan 8% per tahun pada Tahun
   2029.

   Pinjaman tersebut dijamin dengan tanah seluas                     The credit facilities are secured by land square of
   11.233 m2 di lokasi proyek pembangunan Vasaka                     11,233 m2 located on project development of
   Solterra Pejaten dan agunan pokok kredit unit                     Vasaka Solterra Pejaten and cessie of unit
   apartemen dengan asuransi kerugian.                               apartment from customers.




                                                           - 163 -
Page 167
PT WASKITA KARYA (PERSERO) Tbk                                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                          (Expressed in Rupiah, unless otherwise stated)


   Fasilitas ini mensyaratkan Perusahaan                         untuk                   These facilities require the Company to maintain
   memelihara rasio keuangan tertentu:                                                   financial ratio:
   a.     Current ratio > 1x                                                             a.     Current ratio > 1x
   b.     Debt to equity ratio <5x                                                       b.     Debt to equity ratio < 5x
   c.     Rasio modal disetor terhadap total utang di                                    c.     Ratio from paid fully paid capital to total bank
          bank min 10%                                                                          loan min 10%
   d.     EBITDA bernilai positif                                                        d.     EBITDA has positive

   Pihak Ketiga                                                                          Third Parties
   Pinjaman Bank - Modal Kerja
                                                                           Tanggal                             Tingkat bunga per
                                  Jenis fasilitas/      Fasilitas         perjanjian/         Tanggal jatuh          tahun/         30 September/    31 Desember/
          Kreditur/    Entitas/      Type of           maksimum/          Agreement              tempo/         Interest rate per   September 30,    December 31,
          Creditors    Entities     facilities       Maximum facility        date             Maturity date          annum              2024             2023

   PT Bank Jtrust       WKR        Modal Kerja/      65.000.000.000      25 September/          2 Agustus/          10,00%          60.647.177.367      60.937.500.000
   Indonesia Tbk                  Working Capital                        September 25,        August 2, 2027
                                                                             2023


   PT Bank Jtrust Indonesia Tbk                                                          PT Bank Jtrust Indonesia Tbk
   Pada tanggal 30 November 2021, Grup                                                   On November 30, 2021, the Company entered
   menandatangani kontrak perjanjian No. 131 dengan                                      contract agreement No. 131 with PT Bank Jtrust
   PT Bank Jtrust Indonesia Tbk terkait dengan fasilitas                                 Indonesia Tbk related to loan facility amounting to
   pinjaman sebesar Rp65.000.000.000. Fasilitas                                          Rp65,000,000,000. This loan facility will be used
   pinjaman ini hanya dapat digunakan untuk modal                                        specifically for working capital owned WKR, in
   kerja WKR di Vasaka Residential Bali, Denpasar.                                       Vasaka Residential Bali, Denpasar. The outstanding
   Saldo pokok terutang dari fasilitas ini sebesar                                       principal balance amounting to Rp65,000,000,000
   Rp65.000.000.000 dengan jangka waktu fasilitas                                        with term of 60 months after signing contract with
   pinjaman adalah 60 bulan setelah penandatanganan                                      interest rate of 10,55% per annum.
   kontrak perjanjian dengan tingkat suku bunga
   10,55% per tahun.

   Pinjaman tersebut dijamin dengan tanah seluas                                         The credit facilities are secured by land square of
   11.657 m2 di lokasi proyek pembangunan Vasaka                                         11,657 m2 located on project development of
   Residential Bali dan agunan fidusia berupa piutang                                    Vasaka Residential Bali and cessie of receivables
   usaha.                                                                                from customers.

   Fasilitas ini mensyaratkan Perusahaan                         untuk                   These facilities require the Company to maintain
   memelihara rasio keuangan tertentu:                                                   financial ratio.
   a.     Current ratio > 1x                                                                   a.     Current ratio at > 1x
   b.     Debt to equity ratio < 5x                                                            b.     Debt to equity ratio < 5x
   c.     Rasio modal disetor terhadap total utang di                                          c.     Ratio from fully paid capital to total bank
          bank min 10%                                                                                loan min 10%
   d.     EBITDA bernilai positif                                                              d.     EBITDA has positive

   Berdasarkan Akta Notaris No. 23 tanggal 25                                            Based on Notarial Deed No. 23 dated 25 September
   September 2023 oleh Dewi Tenti Septi Artianti, S.H.,                                  2023 by Dewi Tenti Septi Artianti, S.H., M.H., M.Kn.,
   M.H., M.Kn., Notaris di Jakarta perihal perubahan                                     Notary in Jakarta regarding changes to the term
   perjanjian kredit fasilitas kredit angsuran berjangka,                                installment credit facility credit agreement, WKR
   WKR melakukan restrukturisasi kredit dengan Bank                                      carried out credit restructuring with Jtrust Bank with
   Jtrust dengan beberapa perubahan diantaranya,                                         several changes including, the remaining principal
   Sisa Pokok (outstanding) pinjaman per tanggal 23                                      (outstanding) of the loan as of 23 August 2023,
   Agustus 2023 menjadi pagu baru dalam fasilitas                                        the new ceiling in the restructuring facility is worth
   restrukturisasi dengan nilai Rp60.937.500.000;                                        Rp60,937,500,000; change in facility term from
   perubahan jangka waktu fasilitas menjadi sejak                                        effective date of restructuring until 2 August 2027;
   tanggal efektif restrukturisasi sampai dengan 2                                       and changes in interest rates to 10% per year.
   Agustus 2027; dan perubahan tingkat suku bunga
   menjadi 10% per tahun.




                                                                          - 164 -
Page 168
PT WASKITA KARYA (PERSERO) Tbk                                                                             PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                         AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                          NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                 FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                           FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                 ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                         AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                  (Expressed in Rupiah, unless otherwise stated)

   Entitas Anak - WBP                                                                            Subsidiary - WBP
   Pihak Berelasi                                                                                Related Parties

   Berdasarkan Perjanjian Perdamaian dalam PKPU                                                  Based on the Reconciliation Agreement in PKPU
   fasilitas pinjaman ini direstrukturisasi menjadi Utang                                        this loan facility was restructured into Long-Term
   Bank Jangka Panjang sebagai berikut:                                                          Bank Loans as follows:


   Pinjaman Bank - Kredit Modal Kerja
                                                                                 Tanggal                                   Tingkat bunga per
                                        Jenis fasilitas/      Fasilitas         perjanjian/            Tanggal jatuh             tahun/         30 September/     31 Desember/
          Kreditur/          Entitas/      Type of           maksimum/          Agreement                 tempo/            Interest rate per   September 30,     December 31,
          Creditors          Entities     facilities       Maximum facility        date                Maturity date             annum              2024              2023

   PT Bank Rakyat             WBP        Kredit Modal      863.227.418.096      20 Agustus/               Jatuh tempo            2,00%          861.798.917.980    863.227.418.096
   Indonesia (Persero) Tbk              Kerja/ Working                        August 20, 2021         pada tahun ke 17
                                        Capital Credit                                                  sejak tanggal
                                                                                                        efektif/ Due in
                                                                                                         the 17th year
                                                                                                      from the effective
                                                                                                              date
   PT Bank Syariah            WBP        Kredit Modal      698.440.760.706      17 Oktober/               Jatuh tempo            2,00%          697.299.507.085    698.440.760.706
   Indonesia                            Kerja/ Working                        October 17, 2016        pada tahun ke 17
                                        Capital Credit                                                  sejak tanggal
                                                                                                        efektif/ Due in
                                                                                                         the 17th year
                                                                                                      from the effective
                                                                                                              date
   PT Bank Negara             WBP        Kredit Modal      564.949.532.620     23 Juni 2022/              Jatuh tempo            8,00%          535.380.691.483    536.267.943.238
   Indonesia (Persero) Tbk              Kerja/ Working                         June 23, 2022          pada tahun ke 17
                                        Capital Credit                                                  sejak tanggal
                                                                                                        efektif/ Due in
                                                                                                         the 17th year
                                                                                                      from the effective
                                                                                                              date
   PT Bank Mandiri            WBP        Kredit Modal      270.691.905.539     6 Maret/ March             Jatuh tempo           10,50%          304.818.328.075    305.298.506.454
   (Persero) Tbk                        Kerja/ Working                            6, 2023             pada tahun ke 17
                                        Capital Credit                                                  sejak tanggal
                                                                                                        efektif/ Due in
                                                                                                         the 17th year
                                                                                                      from the effective
                                                                                                              date


   1.     PT Bank Rakyat Indonesia (Persero) Tbk.                                                1.      PT Bank Rakyat Indonesia (Persero) Tbk.
          Berdasarkan Surat dari Bank BRI No. R.IV.45-                                                   Based on the Letter from Bank BRI
          CRO/BCO/08/2021 tanggal 20 Agustus 2021                                                        No. R.IV.45-CRO/BCO/08/2021 dated August
          mengenai penawaran putusan kredit, telah                                                       20, 2021 regarding credit decision offer,
          disetujui fasilitas Modal Kerja Konstruksi                                                     the Construction Working Capital Facility has
          (KMKK)       dengan      plafond      sebesar                                                  been     approved    with  a     ceiling     of
          Rp1.000.000.000.000 dan fasilitas SCF sebesar                                                  Rp1,000,000,000,000 with KMKK facitlity and
          Rp250.000.000.000 bersifat interchangeable                                                     the SCF facility of Rp250,000,000,000 is
          dengan fasilitas KMKK, dengan suku bunga                                                       interchangeable with the KMKK facility, with an
          9,00% p.a. dan jangka waktu 30 Agustus 2021                                                    interest rate of 9% p.a. and the period from
          sampai dengan 30 November 2021.                                                                August 30, 2021 to November 30, 2021.
          Fasilitas pinjaman ini dijamin dengan piutang                                                  This loan facility is secured by trade receivables
          usaha yang diikatkan secara cessie minimal                                                     tied in cessie at least to cover 120% of
          meng-cover sebesar 120% dari outstanding                                                       outstanding loans and collateral according to
          pinjaman dan agunan sesuai SHT 209/2017 di                                                     SHT 209/2017 in Gasing Village, Talang Kelapa
          Desa Gasing Kecamatan Talang Kelapa,                                                           District, Banyuasin Regency, South Sumatra
          Kabupaten Banyuasin, Provinsi Sumatera                                                         Province     amounting      to Rp41,651,000,000.
          Selatan senilai Rp41.651.000.000. Sebagai                                                      As additional information, WBP has received a
          tambahan informasi, WBP telah menerima surat                                                   Letter of Review on the Bonding of Loan Facility
          Review Pengikatan Agunan Fasilitas Pinjaman                                                    Collateral from Bank BRI number: B.13a-
          dari Bank BRI nomor: B.13a-ITG/CON/01/2022                                                     ITG/CON/01/2022 dated January 12, 2022 in
          tanggal 12 Januari 2022 sehubungan dengan                                                      connection with the binding of collateral for
          pengikatan jaminan aset Perusahaan.                                                            the Company's assets.
          Adapun perubahan atas negative covenants                                                       The changes to the negative covenants that are
          yang diatur adalah tanpa terlebih dahulu                                                       regulated are that without first obtaining written
          memperoleh persetujuan tertulis dari BRI,                                                      approval from BRI, debtors are not allowed,
          debitur tidak diperkenankan antara lain tetapi                                                 among others, but not limited to receiving new
          tidak terbatas pada menerima pinjaman/                                                         loans/financing from Banks or Other Financial
          pembiayaan baru dari Bank atau Lembaga                                                         Institutions which causes the Company's DER
          Keuangan Lainnya yang menyebabkan rasio                                                        ratio to exceed 300%.
          DER Perusahaan melebihi 300%.

                                                                                - 165 -
Page 169
PT WASKITA KARYA (PERSERO) Tbk                                                         PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                             FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                       FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                             ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                     AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                              (Expressed in Rupiah, unless otherwise stated)

              Pembatasan terhadap tindakan:                                             Restriction of covenant:
              1.   Mengikatkan      diri   sebagai     penjamin                         1.   Binds itself as a collateral against
                   terhadap pihak lain dan/atau menjaminkan                                  the other party and/or pledging Debtor
                   kekayaan debitur kepada pihak lain, kecuali                               wealth to other parties, except those
                   yang sudah ada saat ini.                                                  already existing.
              2.   Mengajukan permohonan pernyataan pailit                              2.   Filing    for     bankruptcy declaration to
                   kepada      Pengadilan       Niaga      untuk                             the Commercial Court to declare itself
                   menyatakan pailit debitur sendiri.                                        insolvent debtor
              3.   Menyewakan aset yang dijaminkan di bank                              3.   Lease the tangible assets in banks or other
                   atau lembaga keuangan lainnya.                                            financial institutions.
              4.   Melunasi/membayar          utang      kepada                         4.   Repay the debt to shareholders/limited
                   pemegang saham/utang persero sebelum                                      Company's debt before the bank repays
                   utang di bank dilunasi terlebih dahulu.                                   the debt in advance.
              5.   Melakukan tindakan merger, akuisisi, go                              5.   Perform mergers, acquisitions, go public
                   public dan penjualan aset Perusahaan.                                     and sell the Company’s assets.
                   Menerima pinjaman/pembayaran baru dari
                   BRI atau lembaga keuangan lainnya.
              Pinjaman BRI akan jatuh tempo pada tahun ke                               BRI loans will be due on the 17th year from
              17 sejak Tanggal Efektif.                                                 Effective Date
   2.         PT    Bank    Syariah    Indonesia (d/h                        2.         PT Bank Syariah Indonesia        (formerly
              PT Bank Mandiri Syariah, PT Bank BNI                                      PT Bank Mandiri Syariah, PT Bank BNI
              Syariah dan PT Bank BRI Syariah)                                          Syariah and PT Bank BRI Syariah)
              Berdasarkan perjanjian pemberian line facility                            Based      Musyarakah          facility   agreement
              Musyarakah No. 13 tanggal 17 Oktober 2016                                 No. 13 dated October 17, 2016, and this facility
              dan fasilitas ini telah diperpanjang berdasarkan                          has recently been extended based on the
              surat No. B.04/SP3/FSD/01-2021 tanggal 27                                 letter No. B.04/SP3/FSD/01-2021 dated January
              Januari 2021, dengan kondisi dan persyaratan                              27, 2021, with the following conditions Line
              sebagai berikut Line Facility Musyarakah                                  Facility     Musyarakah         with    ceiling   of
              dengan plafon Rp470.000.000.000, jatuh tempo                              Rp470,000,000,000, facility maturity date up to
              fasilitas sampai dengan 27 Februari 2022,                                 February 27, 2022, the profit sharing ratio will be
              nisbah bagi hasil akan ditentukan kemudian                                determined later when disbursing with an
              saat pencairan dengan indikasi expense yield                              indication that the current bank yield is 8%
              Bank saat ini sebesar 8% efektif per tahun.                               effective per year. As of the date of reporting,
              Sampai dengan tanggal pelaporan, pinjaman ini                             this loan is still in the process of being extended.
              masih dalam proses perpanjangan.
              Selama masa pembiayaan di PT Bank Syariah                                 During the financing period at PT Bank Syariah
              Indonesia Tbk (BSI) berlangsung maka WBP                                  Indonesia Tbk (BSI), WBP are not permitted to
              tidak diperkenankan melakukan tindakan-                                   carry out the following actions without written
              tindakan di bawah ini tanpa persetujuan tertulis                          consent from BSI:
              dari BSI:
         i.        Mengadakan merger dengan Perusahaan                             i.        Hold a merger with another Company;
                   lain;
        ii.        Membayar/melunasi sebagian atau seluruh                        ii.        Pay/pay off part or all of the loan from
                   pinjaman dari pemegang saham;                                             the shareholders;
        iii.       Mengubah bentuk atau status badan hukum                        iii.       Change the form or status of the legal entity
                   Perseroan, merubah anggaran dasar                                         of       the      Company,         amending
                   Perusahaan,             memindahtangankan                                 the Company's articles of association,
                   penerima atau saham baik antar pemegang                                   transferring recipients or shares both
                   saham maupun pihak lain;                                                  among shareholders and other parties;
        iv.        Mengagunkan,          menyewakan      dan                      iv.        Appoint, lease and transfer assets
                   mengalihkan aset yang dijaminkan kepada                                   guaranteed to creditors or other parties;
                   kreditur atau pihak lainnya;
        v.         Melakukan investasi baru pada bidang                           v.         Make new investments in business fields
                   usaha yang tidak secara langsung berkaitan                                that are not directly related      to the
                   dengan bisnis inti nasabah;                                               customer's core business;
        vi.        Menjual sebagian atau seluruh aset                             vi.        Sells part or all of the Company's assets,
                   Perusahaan, di luar kegiatan operasional                                  excluding the Company's operational
                   Perusahaan;                                                               activities.

                                                                   - 166 -
Page 170
PT WASKITA KARYA (PERSERO) Tbk                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                           (Expressed in Rupiah, unless otherwise stated)

     vii.      Mengajukan    pailit  atau   penundaan                      vii.       File a bankruptcy or delay in payment;
               pembayaran;
    viii.      Menarik kembali modal yang telah disetor                    viii.      Withdrawing capital paid by shareholders;
               oleh para pemegang saham;
        ix.    Merubah pemegang saham mayoritas                                ix.    Change the       majority   shareholder     of
               Perseroan.                                                             the Company.
          Fasilitas dijaminkan dengan:                                           This loan facility are secured with:
          1.   Jumlah tagihan (seluruh hak, wewenang,                            1.   The amount of the bill (all rights, powers,
               tagihan serta klaim-klaim) yang dimiliki                               bills and claims) that the Company has to
               Perusahaan      kepada     bouwheer       atas                         the bouwheer for the work contracts
               kontrak- kontrak pekerjaan yang menjadi                                underlying the disbursement in BSI.
               underlying pencairan di BSI.
          2.   Persediaan berupa barang jadi (Beton                              2.   Inventories in the form of finished goods
               Precast) dan/ atau bahan material berupa                               (Precast Concrete) and/ or material
               pasir, batu, semen, besi/baja, dan lain-lain.                          materials in the form of sand, stone,
                                                                                      cement, iron/steel, and others.
          Nilai fidusia atas jaminan berupa tagihan dan                          Fiduciary value with       collateralized   bill and
          persediaan adalah senilai Rp750.000.000.000.                           inventory      are           amounting            to
                                                                                 Rp750,000,000,000.
          WBP diwajibkan untuk menjaga Debt service                              WBP should maintain Debt service coverage
          coverage ratio (EBITDA dibandingkan total                              ratio (EBITDA compared to the Bank's total
          kewajiban Bank) minimal 1,1 kali dan Leverage                          liabilities) at least 1.1 times and maximum
          maksimal 5 kali.                                                       leverage of 5 times.
          Berdasarkan Surat dari BSI nomor 03/026-                               Based on the Letter from BSI number 03/026
          3/CMG tanggal 24 Maret 2023 perihal Surat                              3/CMG dated March 24, 2023 regarding
          penyampaian tagihan kewajiban PT Waskita                               the Letter of submission of PT Waskita Beton
          Beton Precast Tbk (WBP) ke PT Bank Syariah                             Precast Tbk (WBP) liability bills to PT Bank
          Indonesia Tbk (BSI) atas fasilitas supplier                            Syariah Indonesia Tbk (BSI) for supplier financing
          financing yang masuk dalam kategori kreditur                           facilities that fall into the category of congruent
          kongkuren     sesuai   Putusan      Homologasi                         creditors according to the Decision Homologation
          No. 497/Pdt.SusPKPU/2021/PN.Niaga. Jkt.Pst,                            No. 497/Pdt.SusPKPU/2021/PN.Niaga. Jkt.Pst,
          dengan ini disampaikan hal-hal berikut:                                we hereby submit the following:
          1.   Total tagihan kepada BSI sebagai Kreditur                         1.   Total claims to BSI as Concurrent Creditors
               Konkuren (Fasilitas SCF) adalah sebesar                                (SCF Facility) Rp187,665,894,478.
               Rp187.665.894.478.
          2.   Tunggakan Kewajiban sebelum Putusan                               2.   Arrears of Liability prior to Homologation
               Homologasi sebesar Rp9.984.667.552.                                    Decision of Rp9,984,667,552.
          3.   Pembayaran kewajiban PT Waskita Beton                             3.   Payment of obligations of PT Waskita Beton
               Precast Tbk ke PT Bank Syariah Indonesia                               Precast Tbk to PT Bank Syariah Indonesia
               atas fasilitas Supplier Financing kami                                 for the Supplier Financing facility of
               tagihkan     sebesar      Rp284.119.681.211                            Rp284,119,681,211          (according    to
               (sesuai skedul yang tertera pada surat).                               the schedule stated in the letter).
          4.   Atas pembayaran tagihan ujrah pada bulan                          4.   For payment of ujrah bills in March 2023 in
               Maret 2023 sebesar Rp1.913.420.518 agar                                the amount of Rp1,913,420,518 to be
               dicadangkan oleh PT Waskita Beton Precast                              reserved by PT Waskita Beton Precast to
               ke rekening escrow BSI 7231185636 a.n.                                 the BSI escrow account 7231185636 a.n.
               PT Waskita Beton Precast.                                              PT Waskita Beton Precast.
          5.   Pendebetan atas ujrah tersebut akan                               5.   The debit for the ujrah will be carried out
               dilakukan setelah proses novasi atas                                   afterthe novation process for the SCF
               fasilitas SCF di BSI terselesaikan.                                    facility at BSI iscompleted.
          Pinjaman BSI akan jatuh tempo pada tahun ke                            BSI loans will be due on the 17th year from
          17 sejak Tanggal Efektif.                                              Effective Date.

   3.     PT Bank Negara Indonesia (Persero) Tbk                          3.     PT Bank Negara Indonesia (Persero) Tbk
          Berdasarkan surat No. KPS3/4.1/140/R tanggal                           According to letter No. KPS3/4.1/058/R dated
          23 Juni 2022, Perusahaan memperoleh fasilitas                          June 23,      2022,     WBP   entered    into
          kredit dari PT Bank Negara Indonesia (Persero)                         the credit facilities from PT Bank Negara

                                                                - 167 -
Page 171
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

       Tbk sebagai berikut:                                             Indonesia (Persero) Tbk as follows:
       •    Kredit      modal      kerja      Revolving                 •    Revolving      working     capital   loan of
            Rp50.000.000.000, jangka waktu pinjaman                          Rp50,000,000,000,         the      term   of
            diperpanjang sementara sampai dengan                             the loan is temporarily extended until
            tanggal 26 September 2022 dengan                                 September 26, 2022 with change in
            perubahan suku bunga efektif sebesar                             the effective interest rate to 8.00% p.a.
            8,00% p.a.
       •    Kredit        modal           transaksional                 •    Transactional      capital    loan      of
            Rp300.000.000.000, jangka waktu pinjaman                         Rp300,000,000,000, the term of the loan is
            diperpanjang sementara sampai dengan                             temporarily extended until September 26,
            tanggal 26 September 2022 dengan                                 2022 with change in the effective interest
            perubahan suku bunga efektif sebesar                             rate to 8.00% p.a.
            8,00% p.a..
       •    Kredit modal     kerja    post     financing                •    Post-financing      working      capital  loan
            sebesar Rp214.949.532.620, jangka waktu                          amounting to Rp214,949.532,620, the term
            pinjaman diperpanjang sementara sampai                           of the loan is temporarily extended until
            dengan tanggal 31 Desember 2023 dengan                           December 31, 2023 with a change in
            perubahan suku bunga efektif sebesar                             the effective interest rate to 8.00% p.a.
            8,00% p.a.
       Fasilitas dijaminkan dengan:                                     This loan facility are secured with:
       •    Tagihan termin atas proyek yang dibiayai                    •    Term-in bills on financed projects
       •    Tanah dan Bangunan yang terletak di                         •    Land and Buildings            located   on Jl.
            Jl. Raya Sadang - Subang No.28 KM 15,                            Raya Sadang - Subang No.28 KM 15,
            Kampung Mekarsari, RT 05 RW 02, Desa                             Mekarsari Village, RT 05 RW 02, Cibatu
            Cibatu, Kecamatan Cibatu, Kabupaten                              Village,    Cibatu     District,    Purwakarta
            Purwakarta, Jawa Barat sesuai SHT                                Regency, West Java according to SHT
            No.2342/2015 dan SHT No.02440/2021                               No.2342/2015 and SHT No.02440/2021
            sebesar Rp168.487.004.000.                                       amounting to Rp168,487,004,000.
       •    Tanah dan Bangunan yang terletak di Jl.                     •    Land and        Buildings      located   at Jl.
            Imam Bonjol No. 52, Desa Kalijaya, Kec.                          Imam Bonjol No. 52, Kalijaya Village, West
            Cikarang Barat, (dhi. Cibitung), Kab.                            Cikarang District, (formerly Cibitung),
            Bekasi,   Jawa     Barat    sesuai    SHT.                       Bekasi Regency, West Java according to
            03410/2016 sebesar Rp58.218.498.201.                             SHT. 03410/2016 of Rp58,218,498,201.
       Sebagai tambahan informasi, WBP telah                            As additional information, WBP has received a
       menerima Surat   Keputusan    Kredit (SKK)                       letter from BNI No. KPS3/2.2/204        dated
       No. KPS3/2.2/204 tanggal 19 Mei 2021                             May 19, 2021 regarding the binding of
       sehubungan dengan pengikatan jaminan aset                        the Company's asset collateral.
       Perusahaan.
       Pembatasan terhadap tindakan:                                    Restriction of covenant:
       1.   Melakukan perubahan kegiatan usaha                          1.   Change the business activities as stated in
            sebagaimana tercantum dalam anggaran                             the Articles of Association that can reduce
            dasar yang dapat mengurangi kemampuan                            the Company’s ability to pay off the credit
            melunasi fasilitas kredit.                                       facility.
       2.   Menjual atau memindahkan hak atau                           2.   Sell or transfer all of the assets of
            mengalihkan      seluruh   atau   sebagian                       the Company in a single transaction or in
            kekayaan/ aset dalam satu transaksi atau                         multiple transactions, except:
            dalam beberapa transaksi kecuali:
            •   Menjual atau mengalihkan aset dengan                         •   Selling or transferring assets under
                ketentuan yang bersifat arm’s length                             arragement that are at arm’s length and
                dan dalam rangka menjalankan usaha                               in order to run the daily business
                sehari- hari.                                                    activities
            •   Menjual atau dengan cara lain                                •   Selling or transferring assets as a
                mengalihkan aset sebagai ganti atau                              replacement or to be replaced with
                digantikan aset lainnya yang sebanding                           another comparable assets or better in
                atau lebih baik tipe, sifat dan                                  type, nature, and quality
                kualitasnya.
            •   Menjual atau mengalihkan aset dalam                          •   Selling or transferring       assets for
                rangka pelaksanaan reorgarnisasi oleh                            the     purpose    of         Government
                                                           - 168 -
Page 172
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

                 Pemerintah     Republik      Indonesia                             reorganization of Republic of Indonesia
                 sepanjang penjualan aset tersebut tidak                            as long as the sale of assets did not
                 mempunyai akibat material dan                                      have a material result; and.
             •   Menjual atau mengalihkan aset yang                             •   Selling or transferring assets that are
                 sudah tidak berguna atau tidak dipakai                             not useful or not used with
                 lagi dengan ketentuan yang bersifat                                the requirements of arm’s length
                 arm’s length.
        3.   Mengubah      usaha     yang    sekarang                      3.   Change the operation of current business
             dijalankan/   diusahakan   yang    dapat                           that may cause material impact unless
             menimbulkan akibat material, kecuali                               required by applicable law.
             dipersyaratkan oleh perundang- undangan
             yang berlaku.

        4.   Melakukan  peleburan,     penggabungan,                       4.   Merger, business combination, separation,
             pemisahan,   pembubaran       Perseroan                            liquidation or corporate reorganization
             maupun rekonstruksi (tindakan korporasi),                          (corporate action), except:
             kecuali:
             •   Reorganisasi yang dapat dilakukan                              •   Reorganization can be done by
                 oleh Pemerintah Republik Indonesia                                 the Government of Republic Indonesia
                 sepanjang    tidak     memiliki   akibat                           as long as the impact is not material
                 material.
             •   Tindakan korporasi dengan anggota                              •   The corporate actions with other
                 lain dalam grup dengan ketentuan                                   members in The Company with
                 bahwa tindakan korporasi tersebut                                  the provision following the requirements
                 dilakukan.
             •   Tindakan          korporasi        yang                        •   The Company will be the resurviving
                 dipersyaratkan       oleh      peraturan                           legal entity and will have the legal
                 perundang-undangan yang berlaku.                                   status after the corporate action; and.
             •   Pemisahan       dimana      Perusahaan                         •   Separation in which the Company will
                 menjadi pemegang saham mayoritas.                                  be the majority shareholder.

        5.   Melakukan perubahan anggaran dasar                            5.   Changes in the Articles of Association that
             yang dapat menimbulkan akibat material.                            can lead to a material impact; and.
        6.   Mengajukan permohonan pailit         atau                     6.   Propose to file bankruptcy or postponement
             permohonan      penundaan      kewajiban                           of debt payment to authorized parties
             pembayaran utang kepada instansi yang
             berwenang.
        7.   Memperoleh pinjaman dari bank atau                            7.   Obtain or add a loan from a bank or other
             lembaga keuangan lain.                                             financial institution.
        Pinjaman BNI akan jatuh tempo pada tahun ke                        BNI loans will be due on the 17th year from
        17 sejak Tanggal Efektif.                                          Effective Date.

   4.   PT Bank Mandiri (Persero) Tbk                                 4.   PT Bank Mandiri (Persero) Tbk

        Berdasarkan Surat dari PT Bank Mandiri                             Based on a Letter from PT Bank Mandiri
        (Persero) Tbk No 4.Ar.JPK/SME/SPPK/0076/                           (Persero) Tbk No. 4.Ar.JPK/SME/SPPK/0076
        2023 tanggal 6 Maret 2023 perihal Surat                            /2023 dated 6 March 2023 regarding the Letter
        Penawaran Pemberian Kredit, telah ditentukan                       of Offer for Credit, it has been determined as
        sebagai berikut:                                                   follows:

        1.   Tujuan Penggunaan                                             1.   Purpose of Use
             Pengalihan hak tagih dalam rangka                                  Transfer of billing rights in the context of
             pelaksanaan     Perjanjian    Perdamaian                           implementing the PT Waskita Beton Precast
             PT Waskita Beton Precast Tbk (WBP) dari                            Tbk (WBP) Settlement Agreement from 26
             26 Supplier/ Sub Kontraktor kepada PT                              Suppliers/ Sub-Contractors to PT Bank
             Bank Mandiri atas invoice yang telah                               Mandiri for invoices that have been financed
             dibiayai dengan fasilitas Accepted Invoice                         with the Accepted Invoice Financing facility.
             Financing.




                                                            - 169 -
Page 173
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)


       2.   Fitur dan Ketentuan                                        2.   Features and Conditions

            Fitur dan ketentuan fasilitas kredit WBP                        Features and conditions of the WBP credit
            sesuai dengan Skema Tranche A:                                  facility in accordance with the Tranche A
                                                                            Scheme:
            •   Jenis fasilitas KMK Post Financing                          • Type of facility KMK Post Financing
            •   Jangka waktu 20 September 2022                              • The period is 20 September 2022 to 20
                sampai dengan 20 September 2039                                  September 2039 (17 years from
                (17 tahun sejak tanggal berlaku                                  the effective date of the WBP
                perjanjian WBP).                                                 agreement).
            •   Nilai            pokok          sebesar                     • The           principal     value      is
                Rp270.691.905.539.                                               Rp270,691,905,539.
            •   Bunga sebelum Efektif Perjanjian                            • Interest before the Effectiveness of the
                Perdamaian WBP:                                                  WBP Settlement Agreement:
                -   Bunga sampai dengan jatuh tempo                             -   Interest until the due date of
                    invoice yang dilaporkan kepada                                  the invoice is reported to the PKPU
                    pengurus PKPU (10.5% p.a)                                       management (10.5% p.a) with an
                    dengan biaya bunga sebesar                                      interest fee of Rp21,316,590,997.
                    Rp21.316.590.997.
                -   Bunga setelah homologasi sampai                             -   Interest after homologation until 19
                    dengan 19 September 2022 10.5%                                  September 2022 10.5% p.a) with
                    p.a) dengan biaya bunga sebesar                                 interest costs of Rp13,290,009,918.
                    Rp13.290.009.918.
                -   Jumlah       bunga      sebesar                             -   The amount of           interest   is
                    Rp34.606.600.915.                                               Rp34,606,600,915.
            •   Mekasnisme       Pembayaran     Bunga                       •   Mechanism of Interest Payment before
                sebelum efektif Perjanjian Perdamaian                           the Effectiveness of the WBP
                WBP, seluruh bunga tertunggak baik                              Settlement Agreement, all outstanding
                sebelum maupun pada saat proses                                 interest both before and during the
                PKPU berjalan akan ditangguhkan                                 PKPU process will be deferred and will
                (deferred) dan akan dibayarkan sesuai                           be paid according to the Tranche A
                mekanisme Tranche A, termasuk                                   mechanism, including interest since the
                bunga sejak putusan pengesahan                                  decision to ratify the Settlement
                Perjanjian Perdamaian sampai dengan                             Agreement until the cassation decision.
                putusan kasasi.
            •   Bunga setelah efektif Perjanjian                            •   Interest after effective WBP Settlement
                Perdamaian       WBP       berdasarkan                          Agreement based on the WBP
                Perjanjian Perdamaian WBP, tingkat                              Settlement Agreement, the interest rate
                suku bunga yang berlaku sesuai jangka                           that      applies       according    to
                waktu       pelaksanaan      Perjanjian                         the implementation period of the WBP
                Perdamaian WBP dengan debitur atas                              Settlement Agreement with debtors on
                nama WBP sebagai berikut:                                       behalf of WBP is as follows:
                -   Tahun ke 1 sampai dengan 9                                  -   Years 1 to 9 at 2%;
                    sebesar 2%;
                -   Tahun ke 10 sampai dengan ke 13                             -   Years 10 to 13 at 3%;
                    sebesar 3%;
                -   Diatas tahun ke 13 sebesar 4%.                              -   Over the 13th year at 4%.
            •   Mekanisme pembayaran bunga setelah                          •   Interest payment mechanism after
                efektif Perjanjian Perdamaian WBP:                              the WBP Settlement Agreement
                                                                                becomes effective:
                -   Pembayaran bunga akan dilakukan                             -   Interest payments will be made on
                    pada tanggal 25 yang jatuh tempo                                the 25th which is due every 6
                    pada setiap 6 bulan dari tahun                                  months of the current year after the
                    berjalan setelah tanggal berlaku                                effective date starting from March
                    diawali sejak bulan Maret 2023.                                 2023.
                -   Dalam hal tanggal pembayaran                                -   In the event that the interest
                    bunga tersebut bertepatan dengan                                payment date coincides with a
                    hari libur termasuk hari Sabtu atau                             holiday including Saturday or a
                    hari libur nasional, pembayaran                                 national holiday, the interest

                                                          - 170 -
Page 174
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

                   bunga tersebut akan dilakukan                                  payment will be made on the
                   pada hari kerja berikutnya.                                    following business day.
           •   Koreksi bunga dan denda sebelum                            •   Correction of interest and penalties prior
               efektif Perjanjian Perdamaian WBP.                             to the effectiveness of the WBP
               Bunga, denda dan biaya lainnya dari 26                         Settlement Agreement. Interest, fines and
               Supplier WBP dilakukan koreksi dan                             other fees from 26 WBP Suppliers are
               dicatat disisi WBP sebagai:                                    corrected and recorded on the WBP side
                                                                              as:
               -   Terhadap bunga sebelum tanggal                             -   For interest before the effective
                   efektif    berlaku      Perjanjian                             date of the WBP Settlement
                   Perdamaian      WBP     dilakukan                              Agreement, corrections are made.
                   koreksi.
               -   Seluruh benda dan biaya lainnya                            -   All objects and other costs that
                   yang terdahulu dihapuskan.                                     were previously written off.
           •   Pembentukan fasilitas baru WBP dan                         •   Establishment of a new WBP facility
               mekanisme pengalihan sebagai berikut:                          and transfer mechanism as follow
               -   Fasilitas baru dibentuk atas nama                          -   A new facility was formed on behalf
                   WBP yang mencakup pokok                                        of WBP which includes a principal
                   sebesar Rp270.691.05.539 dan                                   amounting to Rp270,691,05,539
                   bunga dicatat sesuai ketentuan                                 and interest is recorded in
                   pada Perjanjian Perdamaian WBP.                                accordance with the provisions of
                                                                                  the WBP Settlement Agreement.
               -   Terhadap biaya bunga, denda dan                            -   Interest costs, fines and other costs
                   biaya lainnya pada supplier/sub                                to the Supplier/Sub-Contractor will
                   kontraktor akan dikoreksi sesuai                               be corrected according to the WBP
                   Perjanjian Perdamaian WBP dan                                  Amicable Agreement and recorded
                   dicatat di sisi WBP.                                           on the WBP side.
               -   Mekanisme pengalihan dilakukan                             -   The transfer mechanism is carried
                   secara         bertahap   sebagai                              out in stages as the establishment
                   pembentukan fasilitas kredit WBP                               of a WBP credit facility in
                   sesuai ketentuan yang berlaku di                               accordance with the applicable
                   Bank Mandiri dengan total fasilitas                            provisions at Bank Mandiri with a
                   senilai Rp270.691.905.539 dalam                                total facility of Rp270,691,905,539
                   rangka pelaksanaan Perjanjian                                  in the context of implementing the
                   Perdamaian.                                                    Settlement Agreement.

           •   Mekanisme       pembayaran     pokok                       •   Principal payments are made in bullet
               dilakukan secara bullet payment pada                           payments in the 17th year from the
               tahun ke 17 sejak tanggal berlaku                              effective date of the WBP Settlement
               Perjanjian Perdamaian WBP.                                     Agreement.
           •   Dimungkinkan percepatan pelunasan                          •   It is possible to accelerate payment
               dengan pembayaran (pre-payment)                                (prepayment) in the 10th year from the
               pada tahun ke 10 sejak tanggal berlaku                         effective date if the results of the
               apabila hasil pemeriksaan dan evaluasi                         inspection and evaluation in the 7th
               pada tahun ke-7 sejak tanggal berlaku                          year from the effective date by the
               oleh Agen Pemantau Independen                                  Independent Monitoring Agent show
               menunkukkan bahwa WBP memiliki                                 that the WBP has the financial capacity
               kemampuan        keuangan       untuk                          to complete its obligations.
               menyelesaikan kewajibannya




                                                         - 171 -
Page 175
PT WASKITA KARYA (PERSERO) Tbk                                                                            PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                          FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                        AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                 (Expressed in Rupiah, unless otherwise stated)


   Pihak Ketiga                                                                                 Third Parties

   Berdasarkan Perjanjian Perdamaian dalam PKPU                                                 Based on the Reconciliation Agreement in PKPU
   fasilitas pinjaman ini direstrukturisasi menjadi Utang                                       this loan facility was restructured into Long-Term
   Bank Jangka Panjang sebagai berikut:                                                         Bank Loans as follows:
   Pinjaman Bank - Kredit Modal Kerja
                                                                                Tanggal                                   Tingkat bunga per
                                       Jenis fasilitas/      Fasilitas         perjanjian/            Tanggal jatuh             tahun/          30 September/      31 Desember/
         Kreditur/          Entitas/      Type of           maksimum/          Agreement                 tempo/            Interest rate per    September 30,      December 31,
         Creditors          Entities     facilities       Maximum facility        date                Maturity date             annum               2024               2023

   PT Bank DKI               WBP        Kredit Modal      698.988.751.911      2 Juni 2020/              Jatuh tempo            2,00%          118.434.185.683   118.434.185.683
                                       Kerja/ Working                          June 2, 2020          pada tahun ke 17
                                       Capital Credit                                                  sejak tanggal
                                                                                                       efektif/ Due in
                                                                                                        the 17th year
                                                                                                     from the effective
                                                                                                             date
   PT Bank Tabungan          WBP        Kredit Modal      614.149.511.847    12 Oktober 2020/            Jatuh tempo            2,00%          613.182.849.796   614.149.511.847
   Pensiunan Nasional Tbk              Kerja/ Working                          Ocktober 12,          pada tahun ke 17
                                       Capital Credit                             2020                 sejak tanggal
                                                                                                       efektif/ Due in
                                                                                                        the 17th year
                                                                                                     from the effective
                                                                                                             date
   PT Bank Permata Tbk       WBP        Kredit Modal      459.997.319.257    13 Agustus 2021/            Jatuh tempo            2,00%          459.292.521.370   459.997.319.257
                                       Kerja/ Working                        August 13, 2021         pada tahun ke 17
                                       Capital Credit                                                  sejak tanggal
                                                                                                       efektif/ Due in
                                                                                                        the 17th year
                                                                                                     from the effective
                                                                                                             date
   PT Bank CTBC              WBP        Kredit Modal      325.656.250.000    30 Maret 2022/              Jatuh tempo            2,00%          325.150.690.598   325.656.250.000
   Indonesia                           Kerja/ Working                        March 30, 2022          pada tahun ke 17
                                       Capital Credit                                                  sejak tanggal
                                                                                                       efektif/ Due in
                                                                                                        the 17th year
                                                                                                     from the effective
                                                                                                             date
   PT BCA Syariah            WBP        Kredit Modal      111.019.443.140    23 Maret 2022/              Jatuh tempo            2,00%          110.842.053.876   111.019.443.140
                                       Kerja/ Working                        March 23, 2022          pada tahun ke 17
                                       Capital Credit                                                  sejak tanggal
                                                                                                       efektif/ Due in
                                                                                                        the 17th year
                                                                                                     from the effective
                                                                                                             date
   PT Bank ICBC              WBP        Kredit Modal       81.273.937.783     21 Juni 2022/              Jatuh tempo            2,00%          81.143.514.438    81.273.937.783
   Indonesia                           Kerja/ Working                         June 21, 2022          pada tahun ke 17
                                       Capital Credit                                                  sejak tanggal
                                                                                                       efektif/ Due in
                                                                                                        the 17th year
                                                                                                     from the effective
                                                                                                             date


   1.    PT Bank BTPN Tbk                                                                       1.      PT Bank BTPN Tbk
         Berdasarkan perubahan Perjanjian Fasilitas No.                                                 Based on the amendment to Facility Agreement
         L/2020/WBG/X/07 tanggal 12 Oktober 2020,                                                       No. L/2020/WBG/X/07 dated October 12, 2020,
         WBP memperoleh fasilitas kredit dari PT Bank                                                   WBP obtained a credit facility from PT Bank
         BTPN Tbk sebagai berikut:                                                                      BTPN Tbk as follows:
         1.       Pinjaman untuk tujuan modal kerja sebesar                                             1.      Loan for working capital purposes
                  Rp250.000.000.000, dengan jangka waktu                                                        amounting to Rp250,000,000,000, with a
                  sampai dengan tanggal 30 April 2021                                                           term until April 30, 2021 with an interest
                  dengan suku bunga 9% per tahun.                                                               rate of 9% per annum.
         2.       Commercial LC untuk tujuan impor atau                                                 2.      Commercial LC for purposes of importing or
                  pembelian lokal atas bahan baku atau                                                          local purchasing of raw materials or
                  peralatan untuk kegiatan bisnis WBP                                                           equipment for WBP business activities
                  melalui penerbitan LC dan LC usance lokal,                                                    through the issuance of LC and LC local
                  sight, LC usance, payable at sight (LC                                                        usance, sight, LC usance, payable at sight
                  UPAS), LC usance payable at usance (LC                                                        (LC UPAS), LC usance payable at usance
                  UPAU)      sebesar     Rp850.000.000.000,                                                     (LC        UPAU)        amounting       to
                  dengan jangka waktu sampai dengan                                                             Rp850,000,000,000, with the term until
                  tanggal 30 April 2021.                                                                        April 30, 2021.
         3.       Acceptance untuk tujuan akseptasi LC                                                  3.      Acceptance for purposes of LC usance or
                  usance ataupun LC lokal sebesar                                                               local LC of Rp850,000,000,000, with the
                  Rp850.000.000.000, dengan jangka waktu                                                        term of six (6) months.
                  enam (6) bulan.
         4.       Loan on note trust receipt untuk tujuan                                               4.      Loan on note trust receipt for payment of
                  pembayaran LC ataupun LC lokal sebesar                                                        LC or local LC of Rp850,000,000,000, with
                  Rp850.000.000.000, dengan jangka waktu                                                        a term of three (3) months from
                  selama tiga (3) bulan sejak tanggal jatuh                                                     the LC due date or if shorter and may be
                  tempo LC atau apabila lebih singkat dapat                                                     extended to six (6) months from the date of
                                                                               - 172 -
Page 176
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

            diperpanjang hingga enam (6) bulan dari                          issuance of LC or local LC with interest rate
            tanggal penerbitan LC ataupun LC lokal,                          of 9% per annum.
            dengan suku bunga 9% per tahun.
       5.   Guarantee untuk tujuan penerbitan bank                      5.   Guarantee for issuance of bank guarantee
            garansi dalam bentuk payment bond, bid                           in the form of payment bond, bid bond,
            bond, performance bond, dan maintenance                          performance bond, and maintenance bond,
            bond,     sehubungan       dengan     bisnis                     in connection with the borrower's business
            peminjam, sebesar Rp850.000.000.000,                             amounting to Rp850,000,000,000, with a
            dengan jangka waktu selama 12 bulan                              period of 12 months but excluding the 30-
            namun tidak termasuk periode klaim 30 hari                       days calendar claim period.
            kalender.
       6.   Loan on note account payable financing                      6.   Loan on note account payable financing for
            untuk tujuan pembiayaan terkait dengan                           financing purposes related to payments to
            pembayaran kepada supplier peminjam                              the       borrower's      suppliers      of
            sebesar      Rp850.000.000.000,      dengan                      Rp850,000,000,000, with a maximum
            jangka waktu maksimum selama enam (6)                            period of six (6) months and is non-
            bulan dan bersifat non-rolloverable, dengan                      rolloverable and interest rate 8.8% per
            suku bunga 8,8% per tahun.                                       annum.
       7.   Loan on note discounted account payable                     7.   Loan on note discounted account payable
            financing untuk tujuan pembiayaan terkait                        financing for financing purposes related to
            dengan pembayaran kepada supplier                                payments to the borrower's suppliers of
            peminjam sebesar Rp850.000.000.000,                              Rp850,000,000,000, with a maximum
            dengan jangka waktu maksimum selama                              period of six (6) months and is
            enam (6) bulan dan bersifat non-                                 nonextendable and interest rate 8.8% per
            rolloverable, dengan suku bunga 8,8% per                         annum.
            tahun.
       8.   Loan on Note Account Receivable                             8.   Loan on Note Account Receivable
            Financing untuk tujuan pembiayaan terkait                        Financing for financing purposes related to
            piutang- piutang peminjam terhadap                               borrower's receivables to customers
            pelanggan sebesar Rp500.000.000.000,                             amounting to Rp500,000,000,000,000, with
            dengan jangka waktu maksimum selama 4                            a maximum term of 4 (four) months and
            (empat) bulan dan bersifat non-rolloverable,                     non-rolloverable, with an interest rate of
            dengan suku bunga 8,8% per tahun.                                8.8% per annum.
       Fasilitas pinjaman ini dijamin oleh piutang usaha                These loan facilites are collaterized by all
       saat ini atau akan datang dengan nilai                           current or future accounts receivable with
       penjaminan             minimum            sebesar                minimum collateral value amounting to
       Rp1.495.103.746.768 atau 125% dari limit                         Rp1,495,103,746,768 or 125% of the combined
       gabungan yang sudah diikat secara fidusia.                       limit and which has been tied by fiduciary.
       Pembatasan:                                                      Negative Covenants:
       1.   Memasang atau mengizinkan adanya atau                       1.   Installing or permitting the presence or
            dipasangnya Hak Jaminan atas aset-                               installation of security rights over its assets;
            asetnya;
       2.   Menjual, mengalihkan, atau melepaskan                       2.   Sell, transfer, or otherwise dispose of its
            aset- asetnya dengan ketentuan-ketentuan                         assets with the provisions in which these
            dimana aset-aset tersebut dapat disewakan                        assets can be leased or bought back by
            atau dibeli kembali oleh Peminjam;                               the Borrower;
       3.   Menjual, mengalihkan, atau melepaskan                       3.   Sell, transfer, or dispose of its receivables
            piutangnya dengan hak regres;                                    with resource;
       4.   Mengadakan pengaturan apapun dimana                         4.   Entered into any arrangement where
            uang atau manfaat bank atau rekening lain                        the money or the benefits of a bank or other
            dapat digunakan untuk pembayaran,                                account may be used for payments, made
            dilakukan kompensasi (set off) atau                              compensation (set off) or the possibility of
            dimungkinkannya penggabungan beberapa                            combining multiple accounts;
            rekening; atau
       5.   Mengadakan         pengaturan      prioritas                5.   Hold priority setting         receipts    have
            penerimaan pembayaran yang memiliki                              the same effect.
            dampak yang sama.
       Pinjaman BTPN akan jatuh tempo pada tahun                        BTPN loans will be due on the 17th year from
       ke 17 sejak Tanggal Efektif.                                     Effective Date.

                                                           - 173 -
Page 177
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)


   2.   PT Bank Permata Tbk                                          2.   PT Bank Permata Tbk
        Berdasarkan Perjanjian           Pembiayaan                       Based on the Financing Agreement No.
        No. 451/BP/LOO/CRC-JKT/WB/VIII/2021 pada                          451/BP/LOO/CRC-JKT/WB/VIII/2021 On August
        tanggal 13 Agustus 2021, WBP memperoleh                           13, 2021, WBP obtained an Omnibus financing
        fasilitas   pembiayaan     Omnibus  sebesar                       facility of Rp400,000,000,000 with a term of up
        Rp400.000.000.000 dengan jangka waktu                             to July 26, 2022, with the following sub-limits:
        sampai dengan tanggal 26 Juli 2022, dengan
        sub limit sebagai berikut:
        1.   LC/SKBDN/PIF/BG untuk pembelian bahan                        1.   LC/SKBDN/PIF/BG for the purchase of raw
             baku, peralatan-peralatan, dan pembayaran                         materials, equipment, and sub- contractor
             sub-kontraktor       yang       dibutuhkan                        payments needed in connection with the
             sehubungan dengan proyek Nasabah,                                 Customer's project, for financing the
             untuk pembiayaan LC/SKBDN Nasabah                                 Customer's LC/SKBDN that is due, as well
             yang jatuh tempo, serta untuk memenuhi                            as to meet BG needs for the project
             kebutuhan BG atas proyek yang didapatkan                          obtained by the Customer amounting to
             Nasabah     sebesar     Rp400.000.000.000                         Rp400,000,000,000 with an interest rate of
             dengan suku bunga sebesar 9,5% per                                9.5% per annum and 10% per annum for
             tahun dan 10% per tahun untuk PIF.                                PIF.
        2.   Payable Services untuk membiayai tagihan                     2.   Payable Services to finance Non-LC/non-
             atau transaksi Non-LC/non-SKBDN atas                              SKBDN invoices or transactions for trade in
             perdagangan barang terkait dengan proyek-                         goods related to projects undertaken by the
             proyek yang dikerjakan Nasabah sebesar                            Customer      in      the    amount      of
             Rp400.000.000.000 dengan suku bunga                               Rp400,000,000,000 with an interest rate of
             sebesar 10% per tahun.                                            10% per annum.
        3.   Musyarakah Mutanaqisah (MMQ) atau                            3.   Musyarakah Mutanaqisah (MMQ) or
             Revolving    Financing     iB   merupakan                         Revolving Financing iB is financing for
             pembiayaan kebutuhan umum modal kerja                             general working capital needs in connection
             sehubungan dengan aktivitas usaha                                 with the Customer's business activities of
             Nasabah        sebesar Rp300.000.000.000                          Rp300,000,000,000 with an interest rate of
             dengan suku bunga sebesar 11% per tahun.                          11% per annum.
        4.   Revolving    Loan     untuk    pembiayaan                    4.   Revolving Loan to finance general working
             kebutuhan umum modal kerja sehubungan                             capital needs in connection with the
             dengan aktivitas      usaha       Nasabah                         Customer's      business     activities   of
             sebesar Rp100.000.000.000 dengan suku                             Rp100,000,000,000 with an interest rate of
             bunga sebesar 10,5% per tahun.                                    10.5% per annum.
        Penggunaan Limit dan        Sub Limit secara                      The use of Limit and Sub Limit as a whole may
        keseluruhan     tidak       boleh    melebihi                     not exceed Rp400,000,000,000.
        Rp400.000.000.000.

        Pembatasan terhadap tindakan:                                     Restriction of covenant:
        1.   Bertindak sebagai penjamin terhadap                          1.   Binds itself as surety against the other
             hutang pihak lain, kecuali hutang dagang                          party, except in order to perform daily
             yang dibuat dalam rangka menjalankan                              business activites;
             usaha sehari-hari;
        2.   Mengubah sifat dan kegiatan usaha yang                       2.   Change the business activities or run the
             sedang dijalankan atau melakukan kegiatan                         new business opening other than an
             usaha diluar kegiatan usahanya sehari-hari;                       existing business;
        3.   Menjaminkan, mengalihkan, menyewakan,                        3.   Mortgaging, transferring, leasing, submitting
             menyerahkan kepada pihak lain atas                                collateral to the other party;
             barang jaminan.
        4.   Memberikan pinjaman maupun fasilitas                         4.   Provide loans or other financial facility to or
             keuangan kepada atau dari pihak lain                              from the other party except for short-term
             kecuali dalam jangka pendek dan dalam                             and in order to drive the daily business
             rangka menunjang kegiatan usahanya                                activities;
             sehari-hari;
        5.   Melakukan penyertaan yang berpengaruh                        5.   Make new investments that could affect to
             terhadap kemampuan membayar;                                      the payment quality;
        6.   Melakukan tindakan lainnya yang dapat                        6.   Taking      actions    that could  affect
             menyebabkan         atau     terganggunya                         the obligation to the bank;

                                                           - 174 -
Page 178
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

            kewajiban yang terhutang kepada bank;
        7.  Melakukan pembubaran, penggabungan                             7.   Liquidation  of   corporate,  business
            usaha dan/ atau peleburan dengan                                    combination, and/ or merger with other
            Perusahaan      lain   atau   memperoleh                            Company or obtain the part of other
            sebagian besar dari aset dari Perusahaan                            Company’s assets or other business
            lain atau bentuk perubahan usaha lainnya;                           changes;
         8. Mengubah susunan dan jumlah kepemilikan                        8.   Change the form and quantities of
            pemegang saham tertutup dan/ atau                                   the shareholder (except Stated Owned
            pemegang saham pengendali Perusahaan                                Enterprise)
            terbuka (kecuali BUMN);
         9. Membayar atau menyatakan dapat dibayar                         9.   Pay or declare of dividend or distribute the
            suatu dividen atau pembagian keuntungan                             gain in any form of shares issued;
            berupa apapun juga atas saham yang
            dikeluarkan;
        10. Membayar kembali tagihan atau piutang                          10. Repay the bills or receivables that will given
            berupa apapun juga yang sekarang telah                             now and/ or later from shareholders.
            dan/ atau dikemudian hari akan diberikan
            oleh pemegang saham.
        Pinjaman PT Bank Permata Tbk akan jatuh                            PT Bank Permata Tbk loans will be due on the
        tempo pada tahun ke 17 sejak Tanggal Efektif.                      17th year from Effective Date.
   3.   PT Bank CTBC Indonesia                                        3.   PT Bank CTBC Indonesia
        Fasilitas pinjaman ini dijamin oleh piutang usaha                  This loan facility is colaterallized by trade
        dari proyek Perusahaan untuk proyek                                accounts receivable from the Company project
        Pemerintah minimal 125% dari pinjaman yang                         for a Government project for minimum of 125%
        beredar saat ini yang sudah diikat secara                          of current outstanding loan which ties by
        fidusia.                                                           fiduciary.
        Pembatasan terhadap tindakan:                                      Negative convenants or restrictions:
        1.   Mengubah kegiatan usaha sebagaimana                           1.   Changing the business activities as stated
             tercantum dalam anggaran dasar yang                                in the Company’s article of association that
             dapat mengurangi kemampuan melunasi                                could reduce the ability to pay off the credit
             fasilitas kredit.                                                  facility.
        2.   Menjual atau mengalihkan seluruh aset                         2.   Sell or transfer all of assets of
             Perusahaan dalam satu transaksi atau                               the Company in a single transaction or in
             dalam beberapa transaksi, kecuali:                                 multiple transactions, except:
             • Menjual atau mentransfer aset                                    • Selling or transferring assets under
                  dibawah ketentuan arm’s length dan                                 arrangement that are at arm’s length
                  dengan tujuan melakukan kegiatan                                   and in order to run the daily business
                  usaha;                                                             activities;
             • Menjual atau mentransfer aset                                    • Selling or transferring assets as a
                  sebagai pengganti atau diganti                                     replace or to be replaced with another
                  dengan aset lain yang sebanding atau                               comparable assets or better in type,
                  lebih baik menurut jenis, sifat,                                   nature, quality;
                  kualitas;
             • Menjual atau mentransfer aset yang                               •    Selling or transferring assets that are
                  tidak berguna atau tidak digunakan                                 not useful or are not anymore used
                  dengan persyaratan arm’s length; dan                               with the requirements of arm’s length;
                                                                                     and
             •   Penjualan pengalihan aset per tahun                            •    Selling of transferring assets per year
                 melebihi Rp500.000.000.000.                                         exceeding of Rp500,000,000,000.
        3.   Mengubah operasional bisnis saat ini yang                     3.   Changing the operation of current business
             dapat menyebabkan hasil material kecuali                           that may cause material impact unless
             diwajibkan oleh hukum yang berlaku;                                required by appllicable law
        4.   Penggabungan, pemisahan, likuidasi atau                       4.   Merging, business combination, separation,
             rekonstruksi       Perusahaan       kecuali                        liquidation or corporate reorganization
             persyaratan sebagai berikut:                                       except the following requirements:
             • Reorganisasi dapat dilakukan oleh                                • Reorganization can be done by
                 Pemerintah Republik Indonesia selama                                the Government of the Republic of
                 tidak memiliki dampak yang material;                                Indonesia as long as the impact is not

                                                            - 175 -
Page 179
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

                                                                                  material;
             •   Tindakan Perusahaan dengan anggota                           •   The       corporate      actions       with
                 lain dalam kelompok dengan ketentuan                             other members         in     the     group
                 mengikuti persyaratan;                                           with      the     provision      following
                                                                                  the requirements;
             •   Perusahaan akan bertahan sebagai                             •   The Company will survive as legal
                 badan hukum dan akan memiliki status                             entity and will have the legal status
                 hukum setelah tindakan korporasi; dan                            after the corporate action; and
             •   Pemisahan      dimana     Perusahaan                         •   Separation     which     the    Company
                 menjadi pemegang terbesar.                                       becomes the mayor shareholders.
        5.   Perubahan Angaran Dasar yang dapat                          5.   Changes in Articles of Association that can
             menimbulkan akibat material;                                     lead to material impact;
        6.   Mengikat dirinya sendiri sebagai jaminan                    6.   Bind itself as a collateral against
             terhadap pihak lain dan/ atau menjamin                           the other party and/ or pledging
             kekayaan Perusahaan kepada pihak lain,                           the Company’s assets to other parties,
             kecuali yang sudah ada;                                          except those that are already existing;
        7.   Usulkan    berkas    kebangkrutan     atau                  7.   Proposing a file of bankruptcy or
             penundaan pembayaran utang kepada                                postponement of debt payment to
             pihak yang berwenang; dan                                        authorized parties; and
        8.   Melunasi     utang   kepada     pemegang                    8.   Repay the debt to shareholders/ limited
             saham/utang Perusahaan terbatas sebelum                          Company’s debt before the bank repays the
             bank melunasi utangnya terlebih dahulu.                          debt in advance.
        Berdasarkan surat No. MKT/EXT/063/III/ 2022                      Based on letter No. MKT/EXT/063/III/2022
        tanggal 30 Maret 2022, WBP memperoleh                            dated March 30, 2022, WBP obtained credit
        fasilitas kredit dari CTBC berupa kredit modal                   facility from CTBC in the form of working capital
        kerja sebesar Rp285.000.000.000 dengan                           loan amounting to Rp285,000,000,000, with
        jangka waktu jatuh tempo sampai dengan                           maturity period until December 31, 2023 with an
        tanggal 31 Desember 2023 dengan suku bunga                       interest rate of JIBOR+4% per annum or
        JIBOR+4% per tahun atau minimal 10% per                          minimum 10% per annum.
        tahun.
        Pinjaman CTBC akan jatuh tempo pada tahun                        CTBC loans will be due on the 17th year from
        ke 17 sejak Tanggal Efektif.                                     Effective Date.

   4.   PT Bank BCA Syariah                                         4.   PT Bank BCA Syariah

        Berdasarkan     surat    No.     0285/PRBH-                      Based on letter No. 0285/PRBH-BCAS/III/2022
        BCAS/III/2022 tanggal 23 Maret 2022 terkait                      dated March 23, 2022 regarding the
        Perubahan Akad Pembiayaan Musyarakah,                            Amendment           to   Musyarakah      Financing
        WBP memperoleh fasilitas kredit    dari   PT                     Agreement, WBP obtained a credit facility from
        Bank      BCA     Syariah       berupa PMK                       PT Bank BCA Syariah in the form of PMK
        Musyarakah        (Revolving),        sebesar                    Musyarakah         (Revolving),    amounting    to
        Rp100.000.000.000, dengan jangka waktu                           Rp100,000,000,000, with a loan term of up to
        pinjaman sampai dengan tanggal 6 Juni 2022.                      June 6 2022. As at the reporting date, this loan
        Sampai dengan tanggal pelaporan, pinjaman ini                    is still in the process of being renewed.
        masih dalam proses perpanjangan.
        Fasilitas ini dijaminkan dengan Piutang Usaha                    This   loan   facility is  secured             with
        senilai Rp120.000.000.000.                                       account     receivable    amounting              to
                                                                         Rp120,000,000,000.

        Pembatasan:                                                      Negative Covenant:

        WBP sebelum atau sesudah pinjaman diberikan                      WBP before or after the facility provided by the
        oleh bank, juga mempunyai utang kepada pihak                     bank, having loan to the third party that not
        ketiga    dan   hal yang demikian       tidak                    inform to the bank.
        diberitahukan kepada bank.

        Pinjaman PT Bank BCA Syariah akan jatuh                          PT Bank BCA Syariah loans will be due on the
        tempo pada tahun ke 17 sejak Tanggal Efektif.                    17th year from Effective Date.



                                                          - 176 -
Page 180
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   5.   PT Bank ICBC Indonesia                                     5.   PT Bank ICBC Indonesia

        Berdasarkan Perjanjian Kredit No. 152/LOD                       Based       on     the    Credit     Agreement
        CBII/XII/2021 tanggal 10 Desember 2021, WBP                     No. 152/LOD CBII/XII/2021 dated December 10,
        mendapatkan kredit modal kerja dari PT Bank                     2021, WBP obtained a working capital loan from
        ICBC Indonesia dengan jumlah fasilitas sebesar                  PT Bank ICBC Indonesia with total facility
        Rp73.523.809.678, jangka waktu pinjaman                         amounting to Rp73.523.809.678, with loan
        sampai dengan 31 Maret 2022 dengan suku                         period until March 31, 2022 and the interest rate
        bunga sebesar 9,75% per tahun.                                  amounting to 9.75% per annum.

        Fasilitas ini dijamin dengan:                                   This loan facility is collateralized by:

        1.   Piutang usaha WBP yang diikat secara                       1.   Trade accounts receivable of WBP bound
             fidusia.                                                        under fiduciary.
        2.   Sisa nilai atau omzet kontrak WBP -                        2.   Future receivables value or turnover of
             kontraktor harus dengan PT Waskita Karya                        WBP       -      contractors  must  by
             (Persero) Tbk.                                                  PT Waskita Karya (Persero) Tbk.

        Pembatasan:                                                     Negative Covenant:

        Menjaminkan aset kepada pihak lain, kecuali                     Assuring assets to other parties, except when
        bilamana WBP menjaga DER pada maksimal                          WBP maintains DER at a maximum of 3x during
        sebesar 3x selama periode pinjaman.                             the loan period.

   Entitas Anak - WKI                                              Subsidiary - WKI

   Pihak Ketiga                                                    Third Parties

   PT Bank Pembangunan Daerah Jawa Barat dan                       PT Bank Pembangunan Daerah Jawa Barat dan
   Banten Tbk                                                      Banten Tbk

   Berdasarkan Penawaran Pemberian Kredit No.                      Based on Credit Offering No. 115/KKO-KO2/2019
   115/KKO-KO2/2019 tanggal 30 Oktober 2019, PT                    dated October 30, 2019, PT Waskita Karya
   Waskita Karya Infrastruktur memperoleh fasilitas                Infrastruktur obtained credit facilities from PT Bank
   kredit dari PT Bank Pembangunan Daerah Jawa                     Pembangunan Daerah Jawa Barat dan Banten Tbk
   Barat dan Banten Tbk berupa:                                    in the form of:

   a.   Fasilitas Kredit Investasi I dengan maksimal               a.   Investment Credit Facility I with a maximum
        pinjaman Rp142.395.000.000 dengan tingkat                       loan of Rp142,395,000,000 with an interest rate
        suku bunga 10,50% p.a efektif floating rate.                    of 10.50% p.a effective floating rate. Duration of
        Jangka waktu fasilitas sampai dengan 12                         facility until August 12, 2025.
        Agustus 2025.
   b.   Fasilitas Kredit 2 - KI IDC dengan maksimal                b.   Credit Facility 2 - KI IDC with a maximum loan
        pinjaman Rp2.123.000.000 dengan tingkat                         of Rp2,123,000,000 with an effective interest
        suku bunga 10,50% p.a efektif floating rate.                    rate of 10.50% p.a effective floating rate.
        Jangka waktu fasilitas sampai dengan 12                         Duration of facility until August 12, 2025.
        Agustus 2025.
   c.   Fasilitas Kredit KMK R/C Terbatas Swicthable               c.   KMK R/C Credit Facility Limited Swicthable Non
        Non Cash Loan (SCF)        dengan   maksimal                    Cash Loan (SCF) with a maximum loan
        pinjaman Rp50.000.000.000 dengan tingkat                        Rp50,000,000,000 with an effective interest rate
        suku bunga 10,00% p.a efektif floating rate.                    of 10.00% p.a floating rate. Facility period is up
        Jangka waktu fasilitas sampai dengan 11                         to November 11, 2021.
        November 2021.

   Pinjaman ini dijamin dengan sebidang tanah dan                  This loan is secured by a plot of land and a building
   bangunan dengan estimasi luas tanah 51.848 m2                   with an estimated land area of 51,848 m2 and a
   dan luas bangunan 8.000 m2, mesin-mesin dengan                  building area of 8,000 m2, machines with a value of
   nilai sebesar Rp58.300.000.000, piutang usaha                   Rp58,300,000,000, both existing and accounts
   sebesar    Rp95.000.000.000,    dan    letter of                receivable amounting to Rp95,000,000,000, and a
   undertaking notary dari pemegang saham.                         letter of undertaking notary from the shareholders.



                                                         - 177 -
Page 181
PT WASKITA KARYA (PERSERO) Tbk                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                             (Expressed in Rupiah, unless otherwise stated)


        Pembatasan terhadap pinjaman ini antara lain:                           Restrictions on this loan include:

        a.    Memindahtangankan agunan;                                         a.   Transferring collateral;
        b.    Memperoleh fasilitas kredit untuk proyek                          b.   Obtain credit facilities for the same project
              yang sama yang sudah dibiayai oleh bank;                               that has been financed by the bank;
        c.    Menjaminkan harta kekayaan Perusahaan                             c.   Securing company assets pledged to other
              yang dijaminkan kepada pihak lain;                                     parties;
        d.    Mengajukan      permohonan     dan     atau                       d.   Submit an application and or order another
              menyuruh      pihak   lain    mengajukan                               party to submit an application to the court to
              permohonan kepada pengadilan untuk                                     be declared bankrupt or postpone payment
              dinyatakan     pailit atau     penundaan                               of debt;
              pembayaran utang;
        e.    Menyerahkan sebagian atau seluruh hak                             e.   Give up part or all of the rights and or
              dan atau kewajiban WKI atas fasilitas kredit                           obligations of WKI for credit facilities to
              kepada pihak lain.                                                     other parties.

   Pada tanggal 30 September 2024 dan 31 Desember                           As of September 30, 2024 and December 31, 2023,
   2023, saldo pinjaman WKI dari PT Bank                                    the balance of WKI’s loan from PT Bank
   Pembangunan Daerah Jawa Barat dan Banten Tbk                             Pembangunan Daerah Jawa Barat dan Banten Tbk
   masing-masing sebesar Rp105.253.239.022 dan                              amounting     to     Rp105,253,239,022     and
   Rp108.927.609.265.                                                       Rp108,927,609,265.

34. UTANG   VENTURA                    BERSAMA           JANGKA      34. LONG-TERM JOINT VENTURES PAYABLES
    PANJANG

   Akun ini merupakan penerimaan termin dari ventura                        This account represents the accounts receivables
   bersama yang diterima oleh Perusahaan dan akan                           collection that is received by the Company and will
   diperhitungkan pada saat penutupan kerjasama                             be settled at the end of those joint operations, as
   operasi tersebut, sebagai berikut:                                       follow:

                                                                                          30 September/           31 Desember/
                                                                                        September 30, 2024      December 31, 2023
                                                                                               Rp                      Rp
   Ventura Bersama/ Joint Ventures                                                          1.642.144.840.411        1.332.247.776.159
   Jumlah/ Total                                                                            1.642.144.840.411        1.332.247.776.159


35. UTANG LAIN-LAIN JANGKA PANJANG                                   35. OTHER LONG-TERM PAYABLES

                                                                                        30 September/             31 Desember/
                                                                                      September 30, 2024        December 31, 2023
                                                                                             Rp                        Rp

   Pihak Ketiga/ Third Parties
    Provisi Pelapisan Jalan Tol/ Provision For Overlay                                      291.912.063.157            297.775.952.032
    Lain-lain/ Others                                                                        13.783.144.644             12.746.680.556
   Jumlah/ Total                                                                            305.695.207.801            310.522.632.588


   Provisi pelapisan jalan tol merupakan beban                              Provision for Toll Road Overlay represents accruals
   akrual pelapisan jalan tol yang dicadangkan                              for the cost of toll road overlay that is periodically
   secara     berkala     berdasarkan   estimasi                            provided based on estimated utilization of toll road
   penggunaan jalan tol oleh pelanggan.                                     by customers.




                                                                  - 178 -
Page 182
PT WASKITA KARYA (PERSERO) Tbk                                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                           (Expressed in Rupiah, unless otherwise stated)

36. UANG MUKA KONTRAK JANGKA PANJANG                                                36. ADVANCES ON LONG-TERM CONTRACTS

   Rincian saldo uang muka kontrak jangka panjang                                        The details of outstanding advances on long-term
   sebagai berikut:                                                                      contract were as follows:

                                                                                                            30 September/           31 Desember/
                                                                                                          September 30, 2024      December 31, 2023
                                                                                                                 Rp                      Rp
   Pihak Berelasi/ Related Parties
    PT Pelabuhan Indonesia III (Persero)                                                                         7.222.000.000             7.222.000.000
    Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                      61.008.022                61.008.022
   Sub Jumlah/ Sub Total                                                                                         7.283.008.022             7.283.008.022
   Pihak Ketiga/ Third Parties
    Kementerian Pekerjaan Umum dan Perumahan Rakyat/
     The Ministry of Public Works and Housing                                                                  213.678.300.770          294.068.353.821
    The Special Administrative Region of Oenuno- Timor Leste                                                   124.637.262.534          131.046.288.446
    Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                                  27.604.621.739           39.005.100.641
   Sub Jumlah/ Sub Total                                                                                       365.920.185.043          464.119.742.908
   Jumlah/ Total                                                                                               373.203.193.065          471.402.750.930



37. LIABILITAS SEWA GUNA USAHA                                                      37. LEASE LIABILITIES

                                                          30 September/                31 Desember/
                                                        September 30, 2024           December 31, 2023
                                                               Rp                           Rp

   Liabilitas Guna Usaha                                                                                                                  Leased Liabilities
    Tanah                                                          4.977.254.485            4.547.605.850                                              Land
    Bangunan                                                                   --              70.026.936                                          Building
    Kendaraan                                                      8.943.894.370          23.320.872.811                                           Vehicles
   Dikurangi: Bagian Lancar                                      (1.979.510.649)          (7.157.455.725)                               Less: Current Portion
   Jumlah Harga Perolehan                                        11.941.638.206           20.781.049.872                              Total Acquisition Cost



   Liabilitas sewa guna usaha Perusahaan dijamin                                         The Group’s lease liabilities are secured by
   dengan aset sewaan milik penyewa.                                                     the lessor’s leased assets.

38. OBLIGASI WAJIB KONVERSI                                                         38. MANDATORY CONVERTIBLE BONDS

                                                          30 September/                 31 Desember/
                                                        September 30, 2024            December 31, 2023
                                                               Rp                            Rp
   Obligasi Wajib Konversi                                                                                                       Mandatory Convertible Bond
    Obligasi Tahap 1 Tahun 2023                               457.614.726.667              457.614.726.667                               Bond 1 Year 2023
    Obligasi Tahap 2 Tahun 2023                             1.393.155.194.444            1.393.155.194.444                               Bond 2 Year 2023
    Jumlah                                                  1.850.769.921.111             1.850.769.921.111                                          Total
    Diskonto yang belum diamortisasi                      (1.141.142.744.513)           (1.198.957.481.113)                           Unamortized discount
   Jumlah                                                    709.627.176.598               651.812.439.998                                              Total



   Berdasarkan Pengumuman dari IDX Nomor Peng-P-                                         Based on the Announcement from IDX Number
   01325/BEI.PP3/12/2023 tanggal 12 Desember 2023                                        Peng-P-01325/BEI.PP3/12/2023 dated December
   perihal Pencatatan Obligasi Wajib Konversi Waskita                                    12, 2023 regarding the Recording of Waskita Beton
   Beton Precast I Tahun 2023 dan Obligasi Wajib                                         Precast Mandatory Convertible Bonds I of 2023 and
   Konversi Waskita Beton Precast II Tahun 2023                                          Waskita Beton Precast Mandatory Convertible
   PT Waskita Beton Precast Tbk. (WBP), maka                                             Bonds II of 2023 PT Waskita Beton Precast Tbk.
   dilakukan pencatatan atas Obligasi Wajib Konversi                                     (WBP), the Waskita Beton Precast Mandatory
   Waskita Beton Precast I Tahun 2023 (WSBP01CB)                                         Convertible Bonds I of 2023 (WSBP01CB) and
   dan Obligasi Wajib Konversi Waskita Beton Precast                                     Waskita Beton Precast Mandatory Convertible
   II Tahun 2023 (WSBP02CB), yang telah dicatatkan                                       Bonds II of 2023 (WSBP02CB), which will be listed
   di    Bursa    tanggal   13    Desember     2023,                                     on the Stock Exchange on December 13, 2023,
   sebagai berikut :                                                                     as follows :


                                                                            - 179 -
Page 183
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)



                                        Obligasi wajib konversi waskita karya beton
              Nama obligasi            precast I tahun 2023/ Waskita Beton Precast I                   Obligation’s code
                                          Mandatory Convertible Bonds in 2023

   Kode obligasi                                         WSBP01CB                                                   Obligation code
   Kode ISIN                                           IDC000013904                                                      ISIN Code
   Nilai emisi                                       Rp457.614.726.667                                               Emission value
   Tingkat bunga                                    0,00% (Zero Coupon)                                                Interest rate
   Tingkat jatuh tempo                     12 Desember 2023/ December 12, 2023                                            Due date
   Tanggal konversi saham tambahan       12 Desember 2023 (10 tahun sejak tanggal                  Additional share conversion date
                                      penerbitan)/ December 12, 2023 (10 years from the
                                                        date of issue)

                                       Obligasi wajib konversi waskita karya beton
              Nama obligasi           precast II tahun 2023/ Waskita Beton Precast II                  Obligation’s code
                                          Mandatory Convertible Bonds in 2023

   Kode obligasi                                           WSBP02CB                                                 Obligation code
   Kode ISIN                                            IDC0000140001                                                    ISIN Code
   Nilai emisi                                       Rp1.393.155.194.444                                             Emission value
   Tingkat bunga                                     0,00% (Zero Coupon)                                               Interest rate
   Tingkat jatuh tempo                     12 Desember 2023/ December 12, 2023                                            Due date
   Tanggal konversi saham tambahan        12 Desember 2023 (10 tahun sejak tanggal                 Additional share conversion date
                                      penerbitan)/ December 12, 2023 (10 years from the
                                                          date of issue)
   Wali Amanat                                        PT Bank Mega Tbk                                                           Trustee
   Tanggal penerbitan                      12 Desember 2023/ December 12, 2023                                          Publication date
   Tanggal pencatatan                      13 Desember 2023/ December 13, 2023                                           Recording date
   Tanggal pembayaran bunga pertama   Tidak ada bunga yang dibayarkan/ No interest paid                     First interest payment date
   Periode pembayaran bunga                        Tidak ada/ There isn’t any                                  Interest payment period
   Lembaga peringkat                       PT Pemeringkat Efek Indonesia (Pefindo)                                        Rating agency
   Hasil pringkat                                        Id B/ (Single B)                                              Rangking results

   *)Lihat catatan 1d dan 31                                                                                    *)see notes 1d and 31



39. LIABILITAS IMBALAN KERJA                                  39. EMPLOYEE BENEFIT LIABILITIES

   Rincian kewajiban imbalan pasca kerja sesuai UU                  Details of post-employment benefit obligations in
   Republik Indonesia No. 11/2020 Tentang Cipta                     accordance with Law of the Republic of Indonesia
   Kerja dan kewajiban manfaat jangka panjang                       No. 11/2020 concerning Job Creation and other
   lainnya berdasarkan entitas yang disajikan dalam                 long-term benefit obligations based on entities
   laporan keuangan konsolidasian adalah sebagai                    presented in the consolidated financial statements
   berikut:                                                         are as follows:

                                                                                 30 September/                    31 Desember/
                                                                               September 30, 2024               December 31, 2023
                                                                                      Rp                               Rp

   Perusahaan/ the Company                                                                15.944.902.982                15.944.902.982
   Entitas Anak/ Subsidiaries
    PT Waskita Beton Precast Tbk                                                          30.207.468.935                31.042.785.396
    PT Waskita Toll Road                                                                   4.112.393.437                 4.112.393.433
    PT Waskita Karya Realty                                                                2.074.163.484                 2.074.163.484
    PT Trans Jabar Tol                                                                                 --                3.367.903.101
   Jumlah/ Total                                                                          52.338.928.838                56.542.148.396




   Program Pensiun Iuran Pasti                                      Defined Benefit Plans
   Perusahaan menyelenggarakan program pensiun                      The Company provides a defined benefit and other
   imbalan pasti dan imbalan kerja jangka panjang                   long-terms benefit covering all the qualified
   lainnya untuk semua karyawan yang memenuhi                       employees.
   persyaratan.
   Nilai kewajiban yang termasuk dalam laporan posisi               The amount of liabilities included in the consolidated
   keuangan konsolidasian dari manfaat pasca-kerja di               statements of financial position arising from post
   bawah UU Cipta Kerja No. 11/2020 dan kewajiban                   employment benefits under Job Creation No. 11 of
   manfaat jangka panjang lainnya (cuti besar dan                   2020 and other long-term benefit (long leave and
                                                          - 180 -
Page 184
PT WASKITA KARYA (PERSERO) Tbk                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                             (Expressed in Rupiah, unless otherwise stated)

   pegawai kontrak) adalah sebagai berikut:                                contract employees) are as follows:
                                                  30 September/          31 Desember/
                                                September 30, 2024     December 31, 2023
                                                       Rp                     Rp
   Imbalan pascakerja sesuai                                                                                   Post-employment benefits under
     UU Ketenagakerjaan No.13/2003                    21.562.409.152        25.077.279.800                            Labor Law No. 13/2003
   Manfaat jangka panjang lainnya                     31.464.868.596        31.464.868.596                             Other long-term benefit
   Nilai Kini Kewajiban Imbalan Kerja - Akhir         53.027.277.748        56.542.148.396           Present Value Benefit Obligation - Ending



   Dana pensiun ini dikelola oleh PT Asuransi                              The pension plan is managed by PT Asuransi
   Jiwasraya (Persero) yang akta pendiriannya telah                        Jiwasraya (Persero), the deed of establishment of
   disahkan oleh Menteri Keuangan Republik                                 which was approved by the Minister of Finance of
   Indonesia dengan KEP-84/MK/IV/2/1973 tanggal 28                         the Republic of Indonesia in his decision letter
   Februari 1973. Pada tahun 2006, Perusahaan                              KEP-84/MK/IV/2/1973 dated February 28, 1973. In
   menandatangani perjanjian kerja sama       No. WK:                      2006, the Company signed a cooperation agreement
   L.20/P/WK/2006 dan No. AJS: 079.SJ.U. 076                               No. WK:L.20/P/WK/2006 and No. AJS:079.SJ.U.076
   tanggal 28 Juli 2006 tentang Pengelolaan Program                        dated July 28, 2006 concerning to Management of
   Asuransi Pesangon Kumpulan dan Addendum I                               Severance Group Insurance Program and
   Perjanjian   Kerjasama     No.    L.20/P/WK/2006;                       Addendum I to Cooperation Agreement No.
   No. 079 SJ. U. 0706 tanggal 25 April 2008.                              L.20/P/WK/2006; No. 079 SJ. U. 0706 dated April
                                                                           25, 2008.
   a.    Program Imbalan Pasca Kerja                                       a.   Post-employment Benefit

         Imbalan     kerja      memberikan    eksposur                          Employee        benefit     typically     exposes
         Perusahaan terhadap risiko aktuarial seperti                           the Company to actuarial risks such as
         risiko investasi, risiko tingkat bunga, risiko                         investment risk, interest rate risk, longevity risk
         harapan hidup dan risiko gaji.                                         and salary risk.

         Risko investasi                                                        Investment risk
         Nilai kini kewajiban imbalan pasti dihitung                            The present value of the defined benefit plan
         menggunakan tingkat diskonto yang ditetapkan                           liability is calculated using a discount rate
         dengan mengacu pada imbal hasil obligasi                               determined by reference to high quality
         korporasi berkualitas tinggi; jika pengembalian                        corporate bond yields; if the return on plan asset
         aset program di bawah tingkat tersebut, hal itu                        is below this rate, it will create a plan deficit.
         akan mengakibatkan defisit program. Saat ini                           Currently, the plan has a relatively balanced
         program tersebut memiliki investasi yang relatif                       investment in equity securities, debt instruments
         seimbang pada efek ekuitas, instrumen utang                            and real estates. Due to the long-term nature of
         dan real estate. Karena sifat jangka panjang                           the plan liabilities, the board of the pension fund
         dari liabilitas program, dewan dana pensiun                            considers it appropriate that a reasonable
         perlu menetapkan bahwa bagian wajar dari aset                          portion of the plan assets should be invested in
         program harus diinvestasikan pada efek ekuitas                         equity securities and in real estate to leverage
         dan real estate untuk meningkatkan imbal hasil                         the return generated by the fund.
         yang dihasilkan oleh dana.

         Risiko Tingkat Bunga                                                   Interest Rate
         Penurunan      suku     bunga     obligasi  akan                       A decrease in the bond interest rate will
         meningkatkan liabilitas program; namun,                                increase the plan liability; however, this will be
         sebagian akan saling hapus oleh peningkatan                            partially offset by an increase in the return on
         imbal hasil atas investasi instrumen utang.                            the plan’s debt investments.

         Risiko Harapan Hidup                                                   Longevity risk
         Nilai kini kewajiban imbalan pasti dihitung                            The present value of the defined benefit plan
         dengan mengacu pada estimasi terbaik dari                              liability is calculated by reference to the best
         mortalitas peserta program baik selama dan                             estimate of the mortality of plan participants
         setelah kontrak kerja. Peningkatan harapan                             both during and after their employment. An
         hidup peserta program akan meningkatkan                                increase in the life expectancy of the plan
         liabilitas program.                                                    participants will increase the plan’s liability.



                                                               - 181 -
Page 185
PT WASKITA KARYA (PERSERO) Tbk                                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                      (Expressed in Rupiah, unless otherwise stated)

       Risiko Gaji                                                                       Salary risk
       Nilai kini kewajiban imbalan pasti dihitung                                       The present value of the defined benefit plan
       dengan mengacu pada gaji masa depan peserta                                       liability is calculated by reference to the future
       program. Dengan demikian, kenaikan gaji                                           salaries of plan participants. As such, an
       peserta program akan meningkatkan liabilitas                                      increase in the salary of the plan participants will
       program itu.                                                                      increase the plan’s liability.
       Perusahaan      menyelenggarakan     program                                      The Company established defined benefit
       pensiun imbalan pasti mencakup semua                                              pension plan covering all the local permanent
       karyawan tetap lokal dan pegawai kontrak.                                         employees. This plan provides pension benefits
       Program ini memberikan imbalan pensiun                                            based on years of service and salaries of
       berdasarkan penghasilan dasar pensiun dan                                         the employees and contract employees.
       masa kerja karyawan. Perusahaan telah                                             The Company has recorded liabilities of
       membukukan liabilitas manfaat karyawan sesuai                                     employee benefits in accordance with Law No.
       dengan Undang – Undang No. 11 Tahun 2020                                          11 Year 2020 concerning Job Creation
       tentang Cipta Kerja, menggunakan teknik                                           regarding to pertaining to man power, using
       aktuarial, dalam rangka penerapan PSAK No.                                        actuarial techniques, within the framework of
       24 tentang Imbalan Kerja.                                                         the implementation of Indonesian PSAK No. 24
                                                                                         of Employee Benefits.
       Liabilitas imbalan pasca-kerja Perusahaan                                         The amounts included in the statement of
       sehubungan dengan program pensiun yang                                            financial position arising from the Company’s
       termasuk dalam laporan posisi keuangan                                            obligation in respect of the defined benefits plan
       konsolidasian adalah sebagai berikut:                                             is as follows:
                                                             30 September/            31 Desember/
                                                           September 30, 2024       December 31, 2023
                                                                  Rp                       Rp

        Nilai Kini Kewajiban                                    206.778.502.999         206.778.502.999                     Present Value of Obligations
        Nilai Wajar Aset Program                               (202.139.834.475)       (202.139.834.475)                       Fair Value of Plan Assets
        Dampak Pembatasan Aset                                   20.478.759.955          20.478.759.955                       Impact of Asset Restriction
        Liabilitas Bersih yang Timbul                                                                                           Net Liability Arising from
         dari Kewajiban Imbalan Pasti                            25.117.428.479          25.117.428.479                     Defined Benefits Obligation



       Mutasi nilai kini liabilitas imbalan pasti adalah                                 Movements in the present value of the defined
       sebagai berikut:                                                                  benefit liabilities were as follows:

                                                             30 September/           31 Desember/
                                                           September 30, 2024      December 31, 2023
                                                                  Rp                      Rp
        Saldo Awal Nilai Kini Liabilitas                        260.017.384.166        260.017.384.166                              Beginning Balance
        Biaya Jasa Kini                                          23.451.142.230         23.451.142.230                            Current Service Cost
        Biaya Bunga                                              18.335.437.950         18.335.437.950                                     Interest Cost
        (Keuntungan) Kerugian Kurtailment                           172.136.509            172.136.509                    (Gain) Loss from Curtailment
        Imbalan yang Dibayarkan                               (106.848.175.807)      (106.848.175.807)                               Benefits Payment
        Pengukuran Kembali Liabilitas (Aset)                                                                        Remeasurement on the Net Defined
         Imbalan Pasti Neto:                                                                                                   Benefit (Asset) Liability:
         Biaya jasa lalu yang telah diakui                      12.648.502.434          12.648.502.434                      Recognized service costs
         (Keuntungan) Kerugian Aktuarial yang                                                                         Actuarial (Gains)/Losses Arising
          Timbul dari Penyesuaian Pengalaman                      (997.924.483)          (997.924.483)                  from Experience Adjustment
        Saldo Akhir Nilai Kini Liabilitas                      206.778.502.999         206.778.502.999     Ending Balance of Present Value Obligation


       Mutasi nilai wajar dari aset program adalah                                       Movements in the fair value of the plan assets
       sebagai berikut:                                                                  were as follows:

                                                             30 September/           31 Desember/
                                                           September 30, 2024      December 31, 2023
                                                                  Rp                      Rp

        Nilai wajar aset program- awal                         315.211.030.360         315.211.030.360                   Opening fair value of plan assets
        Pengukuran kembali keuntungan (kerugian):                                                                            Remeasurement gain (loss):
         Imbal hasil aset program (tidak termasuk jumlah                                                       Return
                                                                                                               Return on
                                                                                                                      on plan
                                                                                                                         plan assets
                                                                                                                               assets (excluding
                                                                                                                                      (excluding amounts
                                                                                                                                                  amounts
         yang dimasukkan dalam beban bunga neto)                 23.325.616.246         23.325.616.246                  included in net interest expense)
        (Kerugian) Aktuarial atas Aset Program                (136.396.812.131)      (136.396.812.131)               Actuarial (Loss) on Assets Programs
        Nilai Wajar Aset Program - Akhir                       202.139.834.475         202.139.834.475       Closing Fair Value of Plan Assets - Ending



                                                                        - 182 -
Page 186
PT WASKITA KARYA (PERSERO) Tbk                                                            PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                          FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                        AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                 (Expressed in Rupiah, unless otherwise stated)

        Asumsi aktuarial yang signifikan untuk                                        Significant    actuarial     assumptions      for
        penentuan kewajiban imbalan pasti adalah                                      the determination of the defined obligation are
        tingkat diskonto, kenaikan gaji yang diharapkan                               discount rates expected salary increase and
        dan mortalitas. Sensitivitas analisis di bawah ini                            mortality. The sensitivity analysis below have
        ditentukan      berdasarkan       masing-masing                               been determined based on reasonably possible
        perubahan asumsi yang mungkin terjadi pada                                    changes of the respective assumptions
        akhir periode pelaporan, dengan semua asumsi                                  occurring at the end of the reporting period,
        lain konstan.                                                                 while holding all other assumptions constant.
        Berikut adalah analisa sensitivitas atas asumsi                               The followings is the sensitivity analysis of
        signifikan yang mempengaruhi nilai kini                                       significant assumptions that affect the present
        kewajiban dan biaya jasa kini:                                                value of obligations and current service costs:

                                                                                       Nilai Kini Kewajiban/
                                                                                        Present Value of           Biaya Jasa Kini/
                                                                                             Obligation          Current Service Cost

        31 Desember/ December 31, 2023:
        Perubahan Tingkat Diskonto/
         Changes in Discounted Rate
        Naik Menjadi/ Increase to 7,80%                                                        170.164.916.604           17.139.347.131
        Tingkat Diskonto/ Discounted Rate 6,80%                                                181.661.074.520           19.008.837.132
        Turun Menjadi/ Decrease to 5,80%                                                       194.789.641.021           21.222.017.425
        Perubahan Tingkat Kenaikan Upah/
         Changes in Wages Rate
        Naik Menjadi/ Increase to 6,00%                                                        194.153.010.141           21.155.185.282
        Tingkat Kenaikan Upah/ Wages Increase Rate 5,00%                                       181.661.074.520           19.008.837.132
        Turun Menjadi/ Decrease to 4,00 %                                                      170.524.674.842           17.160.151.711


        Durasi rata-rata dari kewajiban imbalan pada                                  The average duration of the benefit obligation at
        30 September 2024 dan 31 Desember 2023                                        September 30, 2024 and December 31, 2023 is
        adalah 18,02 Tahun.                                                           18.02 years.

   b.   Manfaat Jangka Panjang Lainnya                                         b.     Other Long-term Benefits

        Perusahaan juga menyediakan manfaat cuti                                      The Company also provides long service leaves
        besar untuk karyawan yang telah bekerja                                       to the employee who have already rendered 6
        selama 6 tahun dalam bentuk satu kali gaji dan                                years of service in the form of cash amounting
        kewajiban manfaat pegawai kontrak.                                            to one month salary and contract employee
                                                                                      benefit obligations.

        Mutasi nilai kini manfaat jangka panjang lainnya                              Movements in the present value of other long-
        adalah sebagai berikut:                                                       term benefits were as follows:

                                                      30 September/             31 Desember/
                                                    September 30, 2024        December 31, 2023
                                                           Rp                        Rp
        Saldo Awal Nilai Kewajiban Manfaat                                                                          Beginning Balance Long-Term
         Jangka Panjang Lainnya                             17.679.875.404           17.679.875.404                            Benefits Obligation
        Biaya Jasa Kini                                      1.651.929.566            1.651.929.566                           Current Service Cost
        Biaya Bunga                                          1.294.509.554            1.294.509.554                                   Interest Cost
        Imbalan Kerja yang Sudah Tercatat                                                                            Recorded Employee Benefits
         Bagi Pegawai Keluar                               (14.148.375.564)         (14.148.375.564)                     for Outgoing Employees
        (Keuntungan) Kerugian Kurtailmen                      8.476.378.401            8.476.378.401                 (Gain) Loss from Curtailment
        Saldo Akhir Nilai Kewajiban                                                                                  Ending Balance Long-Term
         Manfaat Jangka Panjang                             14.954.317.361           14.954.317.361                          Benefits Obligation


        Perhitungan imbalan pasca-kerja dan manfaat                                   Calculation of post-employment benefits and
        jangka panjang lainnya (cuti besar dan pegawai                                other long-term benefits (long leave and
        kontrak) dihitung oleh aktuaris independen                                    contract    employees),   is   calculated  by
        Kantor Konsultan Aktuarial Nandi dan Sutama.                                  independent actuary Kantor Konsultan Aktuarial
        Asumsi aktuarial pada tanggal 30 September                                    Nandi dan Sutama. Actuarial assumptions as of
        2024 dan 31 Desember 2023 sebagai berikut:                                    and for the year ended September 30, 2024 and
                                                                                      December 31, 2023 are as follows:




                                                                    - 183 -
Page 187
PT WASKITA KARYA (PERSERO) Tbk                                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                   (Expressed in Rupiah, unless otherwise stated)

                                                        30 September/             31 Desember/
                                                      September 30, 2024        December 31, 2023

        Tingkat Diskonto                                6,8% dan 6,25%          6,8% dan 6,25%                                          Discount Rate
        Tingkat Kenaikan Gaji                               5,00%                   5,00%                               Annual Salary Increasing Rate
        Tingkat Mortalitas                                TMI IV 2019             TMI IV 2019                                           Mortality Rate
        Tingkat Cacat                                 5,00% of TMI IV 2019    5,00% of TMI IV 2019                                     Disability Rate
        Umur Pensiun Normal (tahun)                           55                       55                               Normal Retirement Age (years)


40. MODAL SAHAM                                                           40.     SHARE CAPITAL

       Sesuai daftar pemegang saham yang                                              According to the shareholders list from Biro
       dikeluarkan oleh Biro Administrasi Efek (BAE),                                 Adminstrasi Efek (BAE), PT Datindo Entrycom,
       PT Datindo Entrycom, susunan pemegang                                          the composition of the Company’s capital were
       saham Perusahaan adalah sebagai berikut:                                       as follows:

                                                             30 September/ September 30, 2024
                                                              31 Desember/ December 31, 2023
                                                                       Persentase             Jumlah Modal
                                                                      Kepemilikan/              Disetor/
                                               Jumlah Saham/          Percentage of           Total Paid In
                                                Total Shares           Ownership                Capital
        Modal Dasar                               54.295.804.000                              5.429.580.400.000                         Authorized Capital

        Modal Ditempatkan dan Disetor Penuh:                                                                            Subscribed and Fully Paid Capital:
         Saham Preferen (Seri A Dwi Warna)                                                                            Preferred Stock (Dwi Warna Serie A)
          Pemerintah Republik Indonesia                        1                  0,00%                       100   Government of Republic of Indonesia
         Saham Biasa (Seri B)                                                                                                    Common Stock (Serie B)
          Pemerintah Republik Indonesia            21.705.633.361                75,35%       2.170.563.336.100     Government of Republic of Indonesia
         Masyarakat (kepemilikan <0,5%)             7.101.173.654                24,65%         710.117.365.400               Public (each holding <0.5%)
        Jumlah Modal Ditempatkan                                                                                                              Total Issued
         dan Disetor Penuh                         28.806.807.016               100,00%       2.880.680.701.600                           and Fully Paid


       Dibawah ini merupakan Akta Notaris terkait                                     Below are the Notarial Deed related to share
       modal saham:                                                                   capital:
       •    Berdasarkan Peraturan Pemerintah No. 40                                   •     According to Government Regulation
            tahun 1970 status Perusahaan berubah dari                                       No. 40 year 1970, the Company’s status
            Perusahaan      Negara     (PN)    menjadi                                      was changed from State Enterprise into
            Perseroan       (Persero).     Selanjutnya,                                     Perseroan       (Persero).     Furthermore,
            Perusahaan dinamakan PT Waskita Karya                                           the     Company       was     named     as
            (Persero) berdasarkan Akta Perseroan                                            PT Waskita Karya (Persero) in accordance
            Terbatas No. 80 tanggal 15 Maret 1973,                                          with the Deed of Limited Liability
            yang dibuat di hadapan Kartini Mulyadi,                                         Corporation No. 80 dated March 15, 1973 of
            S.H., Notaris di Jakarta. Akta Perseroan                                        Kartini Mulyadi, S.H., Notary in Jakarta.
            Terbatas tersebut telah disahkan oleh                                           The deed was approved by the Minister of
            Menteri Kehakiman pada tanggal 20                                               Law on August 20, 1973 in his Decree
            Agustus 1973 dengan Surat Keputusan No.                                         No. 4.a.5/310/3 and stated on State Gazette
            4.a.5/310/3 serta diumumkan dalam Berita                                        of Republic of Indonesia No. 82 on
            Negara           Republik        Indonesia                                      November 13, 1973, Supplement No. 91.
            No. 82 tanggal 13 November 1973,
            Tambahan Berita Negara No. 91.
       •    Pada tanggal 10 Desember 2012,                                            •     On December 10, 2012, the Company’s
            Perusahaan memperoleh pernyataan efektif                                        obtained       an     effective   statement
            dari Ketua Badan Pengawas            Pasar                                      from the Chairman of the Capital Market
            Modal dan Lembaga Keuangan (Bapepam-                                            and Financial Institution Supervisory
            LK) berdasarkan surat keputusan No. S-                                          Agency          (Bapepam-LK)        through
            14012/BL/2012. Pada tanggal 17 Desember                                         the decision letter No. S-14012/ BL/2012.
            2012     berdasarkan    surat    No.    S-                                      On December 17, 2012, according to letter
            08414/BEI.PPJ/12-2012       Bursa     Efek                                      No. S-08414/BEI.PPJ/12-2012, Indonesian
            Indonesia (BEI) menyetujui penawaran efek                                       Stock Exchange (IDX) agreed to the public
            Perusahaan di BEI kepada masyarakat atas                                        offering of the Company on IDX for
            3.082.315.000 saham biasa dengan nilai                                          3,082,315,000 of common stock with
            nominal Rp100 per saham dan harga                                               the par value Rp100 per share and
            penawaran Rp380 per saham.                                                      the offering price Rp380 per share.



                                                                    - 184 -
Page 188
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

                             ▪                                                                 ▪
       •   Sesuai dengan Akta No. 19 tahun 2018                          •   Based on the Deed No. 19 of 2018 dated
           tanggal 6 April 2018 tentang perubahan                            April 6, 2018 regarding the Amendment of
           peningkatan modal ditempatkan/ disetor                            the Issuance of paid-up capital of article 4
           pasal 4 ayat 3 yang telah disetujui oleh                          paragraph 3 which has been approved by
           Menteri Hukum dan Hak Asasi         Manusia                       the Minister of Law and Human Rights in
           dengan Surat Keputusan No. AHU-                                   Decision      Letter    No.   AHU-AH.01.03-
           AH.01.03-0137350 Tahun 2018 tanggal 6                             0137350 Year 2018 date April 6, 2018
           April 2018 menerangkan bahwa dengan                               explains that with the implementation of
           adanya pelaksanaan MESOP sebanyak                                 MESOP 24,200 (Twenty Four Thousand
           24.200 (Dua Puluh Empat Ribu Dua Ratus)                           Two Hundred) of Series B shares each with
           saham seri B masing-masing saham                                  nominal value of Rp100 (one hundred
           dengan nilai nominal sebesar Rp100                                Rupiah) or with a total nominal value of
           (seratus Rupiah) atau dengan          jumlah                      Rp2,420,000 (two million four hundred and
           nilai     nominal     sebesar Rp2.420.000                         twenty thousand Rupiah), the total issued
           (dua juta empat ratus dua puluh ribu rupiah)                      and paid up capital of the Company
           maka jumlah modal ditempatkan dan disetor                         increased from Rp13,573,878,400 (thirteen
           Perseroan           meningkat            dari                     billion five hundred seventy three million
           Rp13.573.878.400 (tiga belas milyar lima                          eight hundred seventy eight thousand four
           ratus tujuh puluh tiga juta delapan ratus                         hundred) shares to Rp13,573,902,600
           tujuh puluh delapan ribu empat ratus)                             (thirteen billion five hundred seventy three
           saham menjadi Rp13.573.902.600 (tiga                              million nine hundred two thousand and six
           belas milyar lima ratus tujuh puluh tiga juta                     hundred) shares.
           sembilan ratus dua ribu enam ratus) saham.
                             ▪                                                                 ▪
       •   Sesuai dengan Akta No. 9 tahun 2019                           •   Based on the Deed No. 9 of 2019 dated
           tanggal 8 Januari 2019 tentang perubahan                          January 8, 2019 regarding the Amendment
           peningkatan modal ditempatkan/ disetor                            of the Issuance of Paid-up Capital of Article
           pasal 4 ayat 2 dan 3 yang telah disetujui                         4 paragraph 2 and 3 which has been
           oleh Menteri Hukum dan Hak Asasi Manusia                          approved by the Minister of Law and
           dengan Surat Keputusan No. AHU-                                   Human Rights in Decision Letter No. AHU-
           AH.01.03-0010978 tanggal 9 Januari 2019                           AH.01.03-0010978 dated January 9, 2019
           menerangkan bahwa dengan adanya                                   explains that with the implementation of
           pelaksanaan MESOP sebanyak 48.400                                 MESOP 48,400 (Fourty Eight Thousand
           (Empat Puluh Delapan Ribu Empat Ratus)                            Four Hundred) of Series B shares each with
           saham seri B masing-masing saham                                  nominal value of Rp100.00 (one hundred
           dengan nilai nominal sebesar Rp100,00                             Rupiah) or with a total nominal value of
           (seratus Rupiah) atau dengan jumlah nilai                         Rp4,840,000.00 (four million eight hundred
           nominal sebesar Rp4.840.000,00 (empat                             and fourty thousand Rupiah), the total
           juta delapan ratus empat puluh ribu rupiah)                       issued and paid up capital of the Company
           maka jumlah modal ditempatkan dan disetor                         increased from 13,573,902,600 (thirteen
           Perseroan meningkat dari 13.573.902.600                           billion five hundred seventy three million
           (tiga belas milyar lima ratus tujuh puluh tiga                    nine hundred two thousand and six
           juta sembilan ratus dua ribu enam ratus)                          hundred) shares to 13,573,951,000 (thirteen
           saham menjadi 13.573.951.000 (tiga belas                          billion five hundred seventy three million
           milyar lima ratus tujuh puluh tiga juta                           nine hundred fifty one thousand) shares.
           sembilan ratus lima puluh satu ribu) saham.
       •   Berdasarkan Akta No. 11 tahun 2021                            •   Based on the Deed No. 11 of 2021 dated
           tanggal 7 Oktober 2021 tentang perubahan                          October 7, 2021 regarding changes to
           peningkatan Modal Dasar Perusahaan pasal                          the increase in the Company's Authorized
           4 ayat 1 yang telah disetujui oleh Menteri                        Capital Article 4 paragraph 1 which has
           Hukum dan Hak Asasi Manusia dengan                                been approved by the Minister of Law and
           Surat      Keputusan       No.       AHU-                         Human Rights with Decree No. AHU-
           0056001.AH.01.02 tanggal 11 Oktober                               0056001.AH.01.02 dated October 11, 2021,
           2021 menyetujui      peningkatan Modal                            approved an increase in the Company's
           Dasar Perseroan semula 26.000.000.000                             Authorized Capital from 26,000,000,000
           lembar      saham        atau       setara                        shares or equal to Rp 2,600,000,000,000 to
           dengan    Rp2.600.000.000.000      menjadi                        54,295,804,000 shares or equal to
           54.295.804.000 lembar saham terdiri dari 1                        Rp5,429,580,400,00 shares consist of 1
           lembar saham seri A Dwiwarna dan                                  Dwiwarna       series   A    share    and
           54.295.803.999 lembar saham seri B                                54,295,803,999 series B shares with a
           dengan nilai nominal Rp100 per lembar                             nominal value of Rp100 per share or

                                                            - 185 -
Page 189
PT WASKITA KARYA (PERSERO) Tbk                                                                                       PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                   AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                    NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                           FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                     FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                           ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                   AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                            (Expressed in Rupiah, unless otherwise stated)

                saham       atau     setara                                 dengan                                     the equivalent of IDR 5,429,580,400,000.
                Rp5.429.580.400.000.
         •      Anggaran     Dasar     Perusahaan    telah                                                      •      The Company’s Articles of Association has
                beberapa kali mengalami perubahan,                                                                     been amended several times, most recently
                terakhir berdasarkan akta notaris No. 6                                                                by notarial deed No. 6 dated January 21,
                tanggal 21 Januari 2022 yang dibuat                                                                    2022 by Notary Ashoya Ratam, S.H., M.Kn.,
                dihadapan Notaris Ashoya Ratam, S.H.,                                                                  in Jakarta, which has obtained Approval for
                M.Kn., di Jakarta, yang telah mendapatkan                                                              Amendment to the Company's Articles of
                Persetujuan Perubahan Anggaran Dasar                                                                   Association No. AHU- 0014815.AH.01.11
                Perseroan No. AHU-0014815.AH.01.11                                                                     dated January 21, 2022 and Acceptance of
                tanggal 21 Januari 2022 dan Penerimaan                                                                 Notification of Amendment to the Articles of
                Pemberitahuan Perubahan Anggaran Dasar                                                                 Association from the Ministry of Law and
                dari Kementerian Hukum dan Hak Asasi                                                                   Human Rights of the Republic of Indonesia
                Manusia Republik Indonesia No. AHU-                                                                    No. AHU-AH.01.03-0048528 dated January
                AH.01.03-0048528 tanggal 22 Januari 2022.                                                              22, 2022. The Company's Articles of
                Anggaran Dasar Perusahaan mengalami                                                                    Association have been amended related to
                perubahan terkait pasal 4 ayat 2 dan 3                                                                 article 4 paragraphs 2 and 3 regarding
                tentang persetujuan pemegang saham                                                                     approval of the Company's shareholders to
                Perseroan untuk meningkatkan modal                                                                     increase the issued and paid-up capital by
                ditempatkan dan disetor sejumlah sejumlah                                                              2,490,920,541 new series B shares which
                2.490.920.541 saham baru seri B yang                                                                   are new shares resulted from the exercise
                merupakan saham baru hasil pelaksanaan                                                                 of Pre-emptive Rights, so that the new
                Hak Memesan Efek Terlebih Dahulu,                                                                      issued and paid-up capital of the original
                sehingga modal ditempatkan dan disetor                                                                 amounting to Rp2,631,588,647,500 which is
                dari      yang        semula      sebesar                                                              divided     into  26,315,886,475     shares
                Rp2.631.588.647.500 yang terbagi atas                                                                  consisting of 1 Series A Dwiwarna share or
                26.315.886.475 lembar saham yang terdiri                                                               equivalent to Rp100 and 26,315,886.474
                dari 1 saham Seri A Dwiwarna atau setara                                                               Series B shares or equivalent to
                dengan Rp100 dan 26.315.886.474 saham                                                                  Rp2,631,588,647,400                       to
                Seri     B     atau      setara   dengan                                                               Rp2,880,680,701,600 which is divided into
                Rp2.631.588.647.400     menjadi   sebesar                                                              28,806,807,016 shares consisting of 1
                Rp2.880.680.701.600 yang terbagi atas                                                                  Dwiwarna Series A share or equivalent to
                28.806.807.016 lembar saham yang terdiri                                                               Rp100 and 28,806,807,015 Series B shares
                dari 1 saham Seri A Dwiwarna atau setara                                                               or equivalent to Rp2,880,680,701,500.
                dengan Rp100 dan 28.806.807.015 saham
                Seri     B     atau      setara   dengan
                Rp2.880.680.701.500.

41. TAMBAHAN MODAL DISETOR                                                                       41. ADDITIONAL PAID-IN CAPITAL


                                                                                 30 September/          31 Desember/
                                                                               September 30, 2024     December 31, 2023
                                                                                      Rp                     Rp
     Agio Saham                                                                                                                                                                    Premium on Share
      Tambahan modal disetor dari penawaran umum saham                                                                                                  Additional paid-in capital of a public offering
       Perusahaan kepada masyarakat sebesar 3.082.315.000                                                                                          of shares to the public at 3,082,315,000 shares
        saham dengan nilai nominal Rp 100 per saham, yang                                                                                                 with a nominal value of Rp 100 per share,
       ditawarkan Rp 380 per saham                                                 863.048.200.000       863.048.200.000                                            which offered Rp 380 per share
      Tambahan modal disetor dari eksekusi opsi saham karyawan                     118.826.375.828       118.826.375.828     Additional paid-in capital from the exercise of employee stock options
      Tambahan modal disetor dari Penawaran Umum Terbatas I (PUT I)                                                                   Additional paid-in capital of a Limited Public Offering (LOP I)
       Perusahaan kepada masyarakat sebesar 3.653.498.200 saham dengan                                                                        of shares to the public at 3,653,498,200 shares with
       nilai nominal Rp 100 per saham, yang ditawarkan Rp 1.450 per saham        4.969.551.418.508     4.969.551.418.508                 par value Rp 100 per share, offered Rp 1,450 per share
      Tambahan modal disetor dari Hak Memesan Efek Terlebih Dahulu                                                             Additional paid-in capital of a Pre-Emptive Right share and paid up
      bagian dan disetor Negara Republik Indonesia sebesar 12.741.935.475 saham                                                by the Republic of Indonesia amounted to 12,741,935,475 shares
        dengan nilai nominal Rp 100 per saham, yang ditawarkan Rp 620 per saham  6.625.806.447.000     6.625.806.447.000                   par value Rp 100 per share, offered Rp 620 per share
      Tambahan modal disetor dari Hak Memesan Efek Terlebih Dahulu                                                             Additional paid-in capital of a Pre-Emptive Right share and paid up
      bagian dan disetor Masyarakat sebesar 2.490.920.541 saham                                                                 by the Republic of Indonesia amounted to 2,490,920,541 shares
        dengan nilai nominal Rp 100 per saham, yang ditawarkan Rp 620 per saham  1.295.278.681.320     1.295.278.681.320                   par value Rp 100 per share, offered Rp 620 per share
      Dikurangi dengan biaya emisi saham                                           (31.910.365.455)      (31.910.365.455)                                                 Less: Share Issuance Cost
      Dikurangi dengan biaya emisi saham penawaran umum terbatas                   (54.741.313.477)      (54.741.313.477)                    Less: Share Issuance Cost on Limited Public Offering
      Penyesuaian atas Perubahan Kepemilikan                                                                                                                      Adjustment for Changing Ownership
        atas Entitas Anak                                                        (143.262.366.168)     (219.945.216.939)                                                            in Subsidiaries
      Saldo Tambahan modal disetor                                              13.642.597.077.556    13.565.914.226.7850                                                       Total Paid In Capital


   Tambahan modal disetor - agio saham merupakan                                                          Additional paid in capital - premium on share
   agio saham yang berasal dari penawaran umum                                                            represent share premium resulting from public
                                                                                           - 186 -
Page 190
PT WASKITA KARYA (PERSERO) Tbk                                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                       (Expressed in Rupiah, unless otherwise stated)

   saham Perusahaan setelah dikurangi dengan biaya                                   offering by the Company net off share issuance cost.
   emisi saham.
   Biaya emisi efek ekuitas merupakan biaya yang                                     Share issuance costs are payments related to
   berkaitan  dengan    penerbitan    efek   ekuitas                                 the issuance of Company’s equity securities. These
   Perusahaan. Biaya ini mencakup fee dan komisi                                     costs include fees and commissions          paid    to
   yang dibayarkan kepada penjamin emisi, lembaga                                    the     underwriter,   supporting  institutions   and
   dan profesi penunjang pasar modal, dan biaya                                      professionals in capital markets, and the registration
   pencetakan dokumen pernyataan pendaftaran,                                        document printing costs, cost of equity securities
   biaya pencatatan efek ekuitas dibursa efek, serta                                 listing on the stock exchange, as well as promotional
   biaya promosi sesuai dengan Keputusan Ketua                                       cost in accordance with the Decision of
   Badan Pasar Modal No. Kep-97/PM/1996 tanggal 28                                   the Chairman of the Capital Market Board No. Kep-
   Mei 1996 yang diubah dengan Kep-06/PM/2000                                        97/PM/1996 dated May 28, 1996 as amended by
   tanggal 13 Maret 2000, peraturan No. VIII.G.7                                     Kep-06/PM/2000 dated March 13, 2000, regulation
   tentang Pedoman Penyajian Laporan Keuangan                                        No. VIII.G.7 of Guidelines for the Preparation of
   Bab Ekuitas pasal Tambahan Modal Disetor. Biaya                                   Financial Statements Chapter Equity article Additional
   Emisi Efek Ekuitas berasal dari penawaran                                         Paid-in Capital. Share issuance costs derived from
   perdana tahun 2012 sebesar Rp31.910.365.455,                                      the initial public offering in 2012 amounting to
   penawaran umum terbatas I tahun 2015 sebesar                                      Rp31,910,365,455, limited public offering I year 2015
   Rp37.328.848.507 dan penawaran umum terbatas II                                   amounting to Rp37,328,848,507 and limited public
   2021 sebesar Rp17.412.464.970.                                                    offer II year 2021 amounting to Rp17,412,464,970.

42. SALDO LABA                                                                  42. RETAINED EARNINGS
                                                          30 September/            31 Desember/
                                                        September 30, 2024       December 31, 2023
                                                               Rp                       Rp
   Telah Ditentukan Penggunaannya                                                                                                          Appropriated
   Saldo Awal                                              1.725.598.750.818        1.725.598.750.818                                 Beginning Balance
   Saldo Akhir                                             1.725.598.750.818        1.725.598.750.818                                   Ending Balance

   Belum Ditentukan Penggunaannya                                                                                                          Unappropiated
   Saldo Awal Tahun                                      (13.710.682.193.585)      (9.940.244.897.000)                                Beginning Balance
    Rugi yang Dapat Diatribusikan                                                                                          Loss Attributable to Owners of
     Kepada Pemilik Entitas Induk                         (3.002.298.222.784)      (3.770.396.430.342)                                  the Parent Entity
    Pengukuran Kembali Program                                                                                               Remeasurement of Defined
     Imbalan Pasti                                             (182.916.530)              (40.866.243)                                      Benefit Plans
    Penyesuaian atas Perubahan Kepemilikan                                                                            Adjustment for Changes Ownership
      Entitas Anak                                            10.112.781.266                         --                                   in Subsidiaries
   Saldo Akhir Tahun                                     (16.703.050.551.633)    (13.710.682.193.585)                                   Ending Balance


   Perusahaan dan entitas anak membuat penyisihan                                    The    Company       and    subsidiaries   provided
   untuk cadangan umum sesuai dengan UU No. 40                                       appropriation to general reserve in accordance with
   tahun 2007 mengenai Perusahaan Terbatas. UU                                       Law No. 40 year 2007 concerning Limited Company.
   tersebut mengharuskan Perusahaan di Indonesia                                     The law requires companies in Indonesia to provide
   untuk membuat penyisihan cadangan umum                                            a general reserve at least 20% of the issued and
   sekurang- kurangnya 20% dari jumlah modal yang                                    fully paid capital. Reserve funds should be
   ditempatkan dan disetor penuh. Dana cadangan                                      maintained to cover suffered losses and can be
   diadakan untuk menutupi kerugian yang diderita dan                                used as working capital and other purposes by
   dapat dipergunakan sebagai modal kerja dan tujuan                                 the decision of the GMS.
   lain menurut keputusan RUPS.

43. PENDAPATAN USAHA                                                            43. REVENUES

                                                                                                             30 September/ September 30,
                                                                                                             2024                   2023
                                                                                                              Rp                     Rp

   Jasa Konstruksi/ Construction Services                                                                 4.751.782.002.285          6.315.849.111.624
   Bunga dari Jasa Konstruksi/ Interest from Construction Services                                                        --            45.367.152.683
   Penjualan Precast/ Precast Sales                                                                        923.072.266.008             372.694.031.192
   Pendapatan Jalan Tol/ Toll Road Revenue                                                                 834.625.408.174             830.775.748.001
   Pendapatan Property / Property Revenue                                                                  133.504.085.145             134.011.456.603
   Penjualan Infrastruktur Lainnya/ Other Infrastructure Revenue                                            51.990.979.466              45.384.160.692
   Pendapatan Hotel/ Hotel Revenue                                                                          79.877.971.296               64.948.899.601
   Sewa Gedung dan Peralatan/ Buildings and Equipment Rental                                                 8.524.934.703                7.431.443.252
   Jumlah/ Total                                                                                          6.783.377.647.077          7.816.462.003.648



                                                                         - 187 -
Page 191
PT WASKITA KARYA (PERSERO) Tbk                                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                       (Expressed in Rupiah, unless otherwise stated)

   Rincian pendapatan usaha adalah sebagai berikut:                                  The details of the revenues are as follows:
                                                                                                              30 September/ September 30,
                                                                                                              2024                   2023
                                                                                                               Rp                     Rp

   Pihak Berelasi/ Related Parties
    PT Cimanggis Cibitung Tollways                                                                           636.845.878.792          401.834.420.068
    PT Jasamarga Probolinggo Banyuwangi                                                                      349.390.790.738                        --
    PT Trans Jabar Tol                                                                                       304.498.720.420                        --
    KSO/ JO Adhi-Waskita-Jaya Konstruksi                                                                     132.693.555.512            8.480.901.000
    KSO/ JO Waskita - Nindya - Modern                                                                         69.575.924.450           32.909.416.900
    KSO/ JO Waskita - Nindya - Permata                                                                        59.894.101.850              257.337.300
    PT Hutama Karya Infrastruktur                                                                             54.013.118.000            8.961.400.000
    PT Perusahaan Listrik Negara                                                                              46.640.718.198           45.143.821.979
    KSO/ JO Waskita - Nindya - LRS                                                                            41.114.697.500                        --
    PT Bukit Asam Tbk                                                                                         59.310.190.804           65.808.154.787
    PT. Patra Jasa                                                                                            29.821.297.298           62.944.506.687
    KSO/ JO PP - NK                                                                                           29.099.680.000            7.457.472.000
    PT Perusahaan Perseroan (Persero)                                                                         28.302.467.618                        --
    KSO/ JO Hutama - Abipraya - Jaya Konstruksi - Yasa                                                        25.592.508.000                        --
    KSO/ JO Waskita - Bersinar KSO                                                                            24.764.360.000            2.006.878.500
    PT Hutama Karya (Persero)                                                                                 14.831.090.004           23.770.249.685
    PT Jasamarga Japek Selatan                                                                                 2.728.072.585          647.232.305.394
    PT Pelabuhan Indonesia III (Persero)                                                                       1.941.027.717           93.903.845.602
    PT Cibitung Tanjung Priok Port Tollways                                                                                --         202.584.088.660
    KSO/ JO Adhi-Minarta                                                                                                   --          97.466.400.000
    PT Angkasa Pura I (Persero)                                                                                            --         156.816.495.268
    Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                               166.118.185.385          114.015.857.847
   Sub Jumlah/ Sub Total                                                                                 2.077.176.384.871          1.971.593.551.677
   Pihak Ketiga/ Third Parties
    Kementerian Pekerjaan Umum dan Perumahan Rakyat/
     The Ministry of Public Works and Housing                                                            2.776.441.102.308          2.247.907.584.009
    BPJT - PT Pemalang Batang Toll Road                                                                    394.832.091.610            364.949.537.998
    BPJT - PT Waskita Sriwijaya Tol                                                                        344.625.750.148          1.217.971.692.613
    BPJT - PT Waskita Transjawa Tol Road                                                                   221.299.671.066            433.134.903.222
    Kedutaan Besar India/ Embassy of India                                                                 118.902.975.012                          --
    BPJT - PT Waskita Bumi Wira                                                                             95.600.852.254             73.965.282.056
    The Special Adminstrative Region of Oe-Cusse Ambeno of Oenuno                                           62.051.991.098            176.890.829.106
    PT Industri Pameran Nusantara                                                                           57.804.626.000              1.789.240.000
    PT Puradelta Lestari Tbk                                                                                46.647.645.009                          --
    PT Tokyu Construction Co., Ltd.                                                                         42.185.921.193             61.709.642.809
    PT JGC Indonesia                                                                                        35.547.378.222              8.641.683.350
    BPJT - PT Trans Jabar Tol                                                                               35.231.489.617            377.134.744.250
    PT Duta Graha Karya                                                                                     34.136.741.610             92.667.783.131
    PT Multi Welindo                                                                                        25.925.165.000              2.273.856.000
    Shimizu - Total JKT11 Data Center JO                                                                    23.338.384.000                          --
    Kementrian Perhubungan/ The Ministry of Transportation                                                  16.830.175.852             75.655.501.095
    Pemerintah Daerah/ District Governments                                                                              --           168.432.467.112
    PT Amman Mineral Nusa Tenggara                                                                                       --            60.049.985.304
    Kementerian Agama/ The Ministry of Religious Affairs                                                                 --            71.786.941.043
    Lain-lain/ Others (di bawah/ below Rp 20 Milyar/ Billion )                                             374.799.302.207            409.906.778.873
   Sub Jumlah/ Sub Total                                                                                 4.706.201.262.206          5.844.868.451.971

   Jumlah/ Total                                                                                         6.783.377.647.077          7.816.462.003.648



   Rincian pemberi kerja dengan nilai kontribusi                                     Details of the project owners with contribution value
   pendapatan melebihi 10% dari pendapatan usaha                                     exceeding 10% of the Group revenues for
   Grup untuk 30 September 2024 dan 2023 sebagai                                     September 30, 2024 and 2023 are as follows:
   berikut:
                                                                                                              30 September/ September 30,
                                                                                                              2024                   2023
                                                                                                               Rp                     Rp
     Kementerian Pekerjaan Umum dan Perumahan Rakyat/
      The Ministry of Public Works and Housing                                                           2.776.441.102.308          2.247.907.584.009
     BPJT - PT Waskita Sriwijaya Tol                                                                                     --         1.217.971.692.613
     Jumlah/ Total                                                                                       2.776.441.102.308          3.465.879.276.622


44. BEBAN POKOK PENDAPATAN                                                     44. COST OF REVENUES

                                                                   30 September/ September 30,
                                                                 2024                       2023
                                                                  Rp                         Rp
     Jasa Konstruksi                                                                                                             Construction Services
       Bahan Baku                                            1.694.274.634.682           2.300.276.642.860                             Raw Material
       Subkontraktor                                         1.567.449.324.680           2.083.307.430.125                            Subcontractor
       Upah                                                    273.995.002.102             509.912.299.939                                   Wages
       Beban Tidak Langsung                                    942.029.842.886           1.293.179.952.503                            Indirect Costs
     Jumlah Jasa Konstruksi                                  4.477.748.804.350           6.186.676.325.427                 Total Constructions Services
     Jalan Tol                                                   365.875.834.669           353.643.026.452                                  Toll Roads
     Properti dan Hotel                                          159.242.898.405           158.934.789.533                          Property and Hotel
     Infrastruktur Lainnya                                        39.708.845.267            35.187.642.861                         Others Infrastructure




                                                                           - 188 -
Page 192
PT WASKITA KARYA (PERSERO) Tbk                                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                    (Expressed in Rupiah, unless otherwise stated)

                                                               30 September/ September 30,
                                                             2024                       2023
                                                              Rp                         Rp
     Produk Beton                                                                                                                    Concrete Products
       Persediaan Awal                                     272.346.383.365                203.147.938.680                        Beginning Balance
       Pembelian                                           701.607.203.472                307.400.058.377                                Purchases
       Barang tersedia untuk Dijual                        973.953.586.837                510.547.997.057                  Goods Available for Sale
       Persediaan Akhir - Pihak Ketiga                     383.195.042.109                233.749.557.608               Ending Balance - Third Party
       Beban Bahan Baku                                    590.758.544.728                276.798.439.449                    Raw Material Expenses
       Beban Upah                                           33.611.142.306                  7.547.661.144                   Direct Labour Expenses
       Beban Overhead                                       85.712.005.576                 23.743.099.999                       Overhead Expenses
     Jumlah Produk Beton                                   710.081.692.610                308.089.200.592                      Total Concrete Products
     Jumlah Beban Pokok Pendapatan                       5.752.658.075.301              7.042.530.984.865                     Total Cost of Revenues



45. BEBAN PENJUALAN DAN BEBAN UMUM DAN                                     45. SELLING EXPENSES AND GENERAL AND
    ADMINISTRASI                                                               ADMINISTRATION EXPENSES


                                                                                                             30 September/ September 30,
                                                                                                            2024                     2023
                                                                                                             Rp                       Rp

     Beban Penjualan/ Selling Expenses
      Beban Ekspedisi Precast/ Precast Expedition Expenses                                                  69.108.273.290            35.788.982.248
      Beban Area Penjualan/ Sales Area Expenses                                                             26.366.296.976            22.607.268.146
      Pemasaran/ Marketing                                                                                   8.540.415.340             9.344.225.349
      Tender/ Tender                                                                                         8.066.138.643             9.937.509.767
      Iklan/ Advertising                                                                                     1.938.421.212             2.415.094.036
     Sub Jumlah Beban Penjualan/ Sub Total Selling Expense                                              114.019.545.461               80.093.079.546
     Beban Umum dan Administrasi- Kas/ General and Administrative Expenses - Cash
      Gaji Pegawai/ Employee's Salaries                                                                 438.560.861.850              454.346.458.031
      Umum/ General                                                                                     119.022.398.309              149.347.608.582
      Beban Produksi Tidak Teralokasi/ Unallocated Production Expenses                                  142.077.735.174              129.075.452.875
      Gedung/ Building                                                                                   32.438.032.616               28.062.330.339
      Kantor/ Office                                                                                     34.394.213.867               33.630.034.796
      Perjalanan Dinas/ Travelling                                                                       24.498.579.075               29.958.546.453
      THR/ THR Allowance                                                                                 24.535.264.459               26.913.638.901
      Jamsostek/ Jamsostek                                                                               18.338.032.663               18.486.445.806
      Pesangon/ Severance                                                                                30.699.181.953              134.531.906.617
     Sub Jumlah Kas/ Sub Total Cash                                                                     864.564.299.966            1.004.352.422.400
     Beban Umum dan Administrasi- Non Kas/ General and Administrative Expenses - Non Cash
      Penyusutan (Catatan 17)/ Depreciation (Note 17)                                                   157.002.136.093              177.213.473.843
      Amortisasi Aset/ Assets Amortization                                                               34.120.408.621               37.949.500.324
     Sub Jumlah Non Kas/ Sub Total Non Cash                                                             191.122.544.714              215.162.974.167
     Sub Jumlah Beban Umum dan Administrasi/
      Sub Total General and Administrative Expenses                                                   1.055.686.844.680            1.219.515.396.567
     Jumlah/ Total                                                                                    1.169.706.390.141            1.299.608.476.113



   Beban produksi tidak teralokasi merupakan beban                               Unallocated production expenses are general and
   umum dan administrasi di pabrik/ plant yang tidak                             administrative expenses at the factory/plant that do
   berdampak langsung terhadap produksi seperti                                  not have a direct impact on production, such as
   beban gaji, beban operasional, dan lain-lain.                                 salary expenses, operational expenses, etc.

   Beban ekspedisi merupakan biaya pengiriman                                    Expedition expenses are the costs of shipping
   produk dari pabrik produksi menuju lokasi proyek                              products from the production factory to the delivery
   pengiriman.                                                                   project location.

   Beban area penjualan merupakan biaya operasional                              Sales area expenses are operational and employee
   dan pegawai area penjualan.                                                   cost sales area.

   Area penjualan terdiri dari:                                                  The sales area consists of:
     i.  Area    Penjualan      1: berkedudukan   di                             i.   Sales Area 1: domiciled in Palembang, South
         Palembang, Sumatera Selatan, dengan area                                     Sumatra, with sales areas covering the entire
         penjualan seperti meliputi seluruh wilayah                                   Sumatra region.
         Sumatera.
    ii.  Area Penjualan 2: berkedudukan di DKI                                   ii.     Sales Area 2: domiciled in DKI Jakarta, with
         Jakarta, dengan area penjualan meliputi DKI                                     sales areas covering DKI Jakarta, Banten,
         Jakarta, Banten, Jawa Barat, serta Area                                         West Java, as well as the Overseas
         Representative Overseas (Luar Negeri).                                          Representative Area (Overseas).
   iii.  Area Penjualan 3: berkedudukan di Surabaya,                             iii.    Sales Area 3: domiciled in Surabaya, East

                                                                       - 189 -
Page 193
PT WASKITA KARYA (PERSERO) Tbk                                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                           (Expressed in Rupiah, unless otherwise stated)

           Jawa Timur, dengan area penjualan meliputi                                         Java, with sales areas covering Central Java,
           Jawa Tengah, DI Yogyakarta, Jawa Timur,                                            DI Yogyakarta, East Java, Bali, West Nusa
           Bali, Nusa Tenggara Barat, dan Nusa                                                Tenggara and East Nusa Tenggara
           Tenggara Timur
   iv.     Area    Penjualan    4:   berkedudukan   di                               iv.      Sales Area 4: domiciled in Balikpapan, East
           Balikpapan, Kalimantan Timur, dengan area                                          Kalimantan, with sales areas covering
           penjualan meliputi Kalimantan.                                                     Kalimantan.
    v.     Area Penjualan 5: berkedudukan di Makassar,                                v.      Sales Area 5: domiciled in Makassar, South
           Sulawesi Selatan, dengan area penjualan                                            Sulawesi, with sales areas covering Sulawesi,
           meliputi Sulawesi, Kepulauan Maluku, dan                                           Maluku Islands and Papua.
           Papua.

46. BEBAN - NON-CONTRIBUTING PLANT                                             46. NON-CONTRIBUTING PLANT - EXPENSES

   Beban non-contributing plant merupakan merupakan                                   Non-contributing plant expenses are the difference
   selisih biaya (efisiensi) yang timbul atas proses                                  in costs (efficiency) that arise from the process of
   evaluasi biaya produksi langsung dengan standard                                   evaluating direct production costs with the standard
   cost estimate yang telah ditetapkan. Standar cost                                  cost estimate that has been determined. Production
   estimate produksi sebelumnya telah ditetapkan                                      cost estimate standards have previously been
   dengan mempertimbangkan/memperhitungkan level                                      determined by considering/taking into account
   normal penggunaan bahan, perlengkapan, tenaga                                      normal levels of use of materials, equipment, labor,
   kerja, efisiensi dan kapasitas. Standar cost estimate                              efficiency and capacity. Standard production cost
   produksi ditelaah secara berkala/regular sesuai                                    estimates are reviewed periodically/regularly in
   dengan kondisi terkini dengan menyesuaikan                                         accordance with current conditions by adjusting
   asumsi-asumsi makro dan mikro ekonomi yang                                         developing macro and micro economic assumptions.
   berkembang. Evaluasi biaya produksi tersebut                                       Evaluation of production costs includes raw material
   meliputi beban bahan baku, upah, peralatan,                                        costs, wages, equipment, depreciation, quality and
   penyusutan, mutu dan stock opname variance.                                        stock taking variance
   Jumlah beban - Non-contributing Plant untuk                                        Total Non-contributing Plant Expenses for the nine
   periode – periode sembilan bulan yang berakhir 30                                  month periods ending September 30, 2024 and
   September 2024 dan 2023 pada masing-masing                                         2023 amounted to Rp100,473,155,984 and
   sebesar             Rp100.473.155.984             dan                              Rp247,515,527,165 respectively.
   Rp247.515.527.165.

47. PENDAPATAN (BEBAN) LAIN-LAIN - BERSIH                                      47. OTHER INCOME (EXPENSES) - NET

                                                                                                            30 September/ September 30,
                                                                                                           2024                     2023
                                                                                                            Rp                       Rp

   Keuntungan dari Divestasi Entitas Anak dan Asosiasi/
    Gain on Divesment of Subsidiary and Associates                                                         250.389.348.334                       --
   Pemulihan Aset Tetap/ Recovery on Property, Plant, and Equipment                                        268.071.786.026                       --
   Keuntungan atas Modifikasi Utang/ Gain on Modification of Debt                                                        --        328.807.340.585
   Kompensasi/ Compensation JSN                                                                                          --         57.887.613.264
   Kompensasi/ Compensation SMR                                                                                          --        183.480.867.182
   Penghapusan Aset Tetap/ Write-off on Property, Plant, and Equipment                                   (434.195.483.590)                       --
   Amortisasi atas Modifikasi Utang/ Amortization on Modification of Debt                                (293.484.720.148)                       --
   Pemulihan (Penyisihan) Kerugian Ekpektasian Penurunan Nilai (Catatan 8, 10, 11, 13)/
    Recovery (Allowance) For Impairment Expected Credit Losses (Notes 8, 10, 11, 13)                        32.026.741.730          82.887.386.279
   Pendapatan (Beban) Lain-lain Proyek/ Others Revenue (Expenses) Project                                 (26.608.795.416)        (11.709.494.866)
   Provisi atas Penurunan Nilai Persediaan dan Aset Tetap/
    Provision of Impairment Losses Inventories and Property, Plant and Equipment                            (151.143.769)         (76.909.896.053)
   Pendapatan (Beban) Lain-lain KSO/ Others Revenue (Expenses) JV                                           7.916.836.945         (32.340.925.489)
   Pendapatan (Beban) Lain-lain/ Others Revenue (Expense)                                                  58.878.590.696         (21.188.067.600)
   Jumlah/ Total                                                                                         (137.156.839.192)         510.914.823.302


   Pendapatan        (beban)      lain-lain    merupakan                              Other income (expenses) represent non operating
   pendapatan non-operasional yang berasal dari                                       income from restructuring of bank loan and bonds
   restrukturisasi utang bank dan utang obligasi pada                                 payable in subsidiary, completed projects, others JV,
   entitas anak, proyek yang sudah selesai, selisih dari                              difference between estimated accruals compared to
   estimasi akrual dibandingkan dengan realisasi yang                                 realization which is presented net of other expenses
   disajikan bersih dengan beban lain-lain proyek                                     for completed projects, profit on divestment, and
   selesai, laba atas divestasi, dan lain-lain KSO.                                   others JV.

                                                                           - 190 -
Page 194
PT WASKITA KARYA (PERSERO) Tbk                                                                                         PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                             FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                       FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                             ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                     AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                              (Expressed in Rupiah, unless otherwise stated)

   Keuntungan dari Divestasi Entitas Anak dan                                                              Gains from Divestment of Subsidiaries and
   Asosiasi merupakan keuntungan berdasarkan akta                                                          Associates are profits based on notarial deed No. 26
   notaris No. 26 tanggal 25 januari 2024 yang dibuat                                                      dated January 25, 2024, made before Liestiani
   dihadapan Liestiani Wang, S.H., M.Kn., Notaris di                                                       Wang, S.H., M.Kn., Notary in Jakarta. WTR as a
   Jakarta. WTR selaku pemegang saham menjual                                                              shareholder sold 1,235,000 shares in TJT for
   kepemilikan saham di TJT sebanyak 1.235.000                                                             Rp755,330,988,463 to SMI. WTR recognized a profit
   lembar saham seharga Rp755.330.988.463 kepada                                                           of Rp250,389,348,334.
   SMI. WTR mengakui keuntungan sebesar
   Rp250.389.348.334.

   Pemulihan di penghapusan aset tetap merupakan                                                           Recovery on write-off of fixed assets is a transaction
   transaksi terkait dengan catatan 18.                                                                    related to note 18.

48. BEBAN KEUANGAN                                                                                  48. FINANCIAL CHARGES

     Merupakan beban bunga atas utang bank/ non-                                                           Represents group’s interest expenses on bank
     bank, beban provisi, dan beban administrasi bank                                                      loans/ non-banks, provision fees, and administrative
     yang terkait dengan perolehan pinjaman Grup                                                           expenses related to the acquisition of bank loans
     selama periode berjalan setelah dikurangi biaya                                                       during the current period after deducting the interest
     bunga yang secara langsung dapat diatribusikan                                                        costs which are directly attributable to the cost of a
     dengan biaya perolehan suatu proyek tertentu yang                                                     qualifying project and the interest expense on debt
     memenuhi syarat dan beban bunga atas utang                                                            Corporate bonds.
     obligasi Perusahaan.

49. BAGIAN LABA (RUGI) BERSIH ENTITAS                                                               49. EQUITY IN NET INCOME (LOSS) OF
    ASOSIASI DAN VENTURA BERSAMA                                                                        ASSOCIATES AND JOINT VENTURES

   Berikut ini adalah bagian laba (rugi) bersih entitas                                                    Following the details of the equity in net income
   asosiasi dan ventura bersama:                                                                           (loss) of associates and joint ventures:

                                                                                30 September/ September 30,
                                                                                2024                  2023
                                                                                 Rp                    Rp
   Bagian Rugi Bersih Ventura                                                                                                                                    Equity in Loss Income of
    Bersama Konstruksi - Catatan 15                                        (210.062.830.274)               (196.495.049.582)                      Construction Joint Ventures - Note 15
   Bagian Rugi Bersih                                                                                                                                                Equity in Net Loss of
    Entitas Asosiasi- Catatan 15                                            (94.029.303.085)                 (30.302.269.698)                             Associates Entities - Note 15
   Jumlah                                                                  (304.092.133.359)               (226.797.319.280)                                                                    Total


50. KEPENTINGAN NON-PENGENDALI                                                                      50. NON-CONTROLLING INTEREST
                                                                                                                      30 September/ September 30, 2024
                                                                                                          Bagian Laba (Rugi)         Bagian Laba (Rugi)          Penambahan
                                                                                      Nilai Awal/          Tahun Berjalan/             Tahun Berjalan/          (Pengurangan)/          Nilai Akhir/
                                                                     Kepemilikan/     Beginning             Profit (Loss)          Comprehensive Income            Additional            Ending
                                                                      Ownership        Balance              Current Year             (Loss) Current Year          (Deduction)            Balance
                                                                         %                Rp                     Rp                          Rp                       Rp                    Rp
   Masyarakat Umum (Untuk/ for WBP)                                    70,83%        3.278.211.609.135       (453.762.046.612)                             --       17.823.220.766     2.842.272.783.289
   PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for WTR)     7,90%         1.940.633.927.351        (59.400.833.560)                             --                     --   1.881.233.093.791
   RDPT WTTR (Untuk/ for WTTR)                                         11,92%          639.434.906.529         (4.303.843.210)                             --                     --     635.131.063.319
   PT Bagasasi Inti Pratama (untuk/ for WMR)                           40,00%          158.444.262.771         (2.310.962.958)                             --                     --     156.133.299.813
   PT Sumber Mitra Jaya (Untuk/ for PBTR)                              40,00%          208.537.283.345        (90.479.302.122)                             --                     --     118.057.981.223
   PT Graha Jasa Ekatama (Untuk/ for WFPR)                             40,00%           72.129.792.426           (624.899.560)                             --                     --      71.504.892.866
   PT Shalawat Power (Untuk/ for WSE)                                  6,00%            15.210.030.801           (894.912.928)                             --          (53.427.783)       14.261.690.090
   Perusahaan Daerah Prodexim (Untuk/ for WST)                         0,81%             3.103.042.869            (84.204.383)                             --                     --       3.018.838.486
   PT Kaltim Binasarana Konstruksi (Untuk/ for TTB)                    20,00%            1.633.697.683                (42.466)                             --                     --       1.633.655.217
   Perusda Benuo Taka (Untuk/ for TTB)                                 15,00%            1.225.273.262                (31.850)                             --                     --       1.225.241.412
   PT Panca Wira Usaha (Untuk/ for WBW)                                0,19%               950.407.969           (231.267.684)                             --                     --         719.140.285
   Perusda Komaba (Untuk/ for TTB)                                     5,00%               408.424.422                (10.617)                             --                     --         408.413.805
   Koperasi Waskita (Untuk/ for WWE)                                   0,05%                  3.380.795                     48                             --                     --           3.380.843
   Koperasi Waskita (Untuk/ for WKR)                                   0,01%                  1.291.038               (96.925)                             --                     --           1.194.113
   Koperasi Waskita (Untuk/ for WTR)                                   0,01%                  1.003.938                      --                            --                     --           1.003.938
   Koperasi Waskita (Untuk/ for TJT)                                   0,00%                (4.662.397)               (35.475)                             --             4.697.872                    --
   Koperasi Waskita (Untuk/ for PT WKI)                                0,01%                     34.799              (127.026)                             --                     --             (92.227)
   Koperasi Waskita (Untuk/ for WBP)                                   0,01%                  (405.652)              (162.596)                             --                     --           (568.248)
   Perusahaan Daerah Bende Seguguk (Untuk/ for WST)                    1,00%             (195.198.121)           (101.045.259)                             --                     --       (296.243.380)
   Jumlah/ Total                                                                     6.319.728.102.963       (612.193.825.183)                             --       17.774.490.855     5.725.308.768.635



                                                                                            - 191 -
Page 195
PT WASKITA KARYA (PERSERO) Tbk                                                                                           PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                       AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                        NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                               FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                         FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                               ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                       AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                (Expressed in Rupiah, unless otherwise stated)



                                                                                                                        31 Desember/ December 31, 2023
                                                                                                            Bagian Laba (Rugi)        Bagian Laba (Rugi)           Penambahan
                                                                                      Nilai Awal/            Tahun Berjalan/            Tahun Berjalan/           (Pengurangan)/         Nilai Akhir/
                                                                     Kepemilikan/     Beginning               Profit (Loss)         Comprehensive Income             Additional           Ending
                                                                      Ownership        Balance                Current Year            (Loss) Current Year           (Deduction)           Balance
                                                                         %                Rp                       Rp                         Rp                        Rp                   Rp
   Masyarakat Umum (Untuk/ for WBP)                                    70,64%         1.851.509.003.354            4.450.519.115                 (107.134.156)     1.422.359.220.822    3.278.211.609.135
   PT Dana Tabungan dan Asuransi Negeri (Persero) (Untuk/ for WTR)     7,90%          2.033.632.643.095         (92.998.715.744)                             --                    --   1.940.633.927.351
   RDPT WTTR (Untuk/ for WTTR)                                         11,92%           629.153.411.627           10.281.494.902                             --                    --     639.434.906.529
   PT Sumber Mitra Jaya (Untuk/ for PBTR)                              40,00%           371.350.414.458        (162.813.131.113)                             --                    --     208.537.283.345
   PT Bagasasi Inti Pratama (untuk/ for WMR)                           40,00%           161.634.455.696          (3.190.192.925)                             --                    --     158.444.262.771
   PT Graha Jasa Ekatama (Untuk/ for WFPR)                             40,00%            70.978.163.796            1.151.628.630                             --                    --      72.129.792.426
   PT Shalawat Power (Untuk/ for WSE)                                  6,00%             18.951.626.603          (3.741.595.802)                             --                    --      15.210.030.801
   Perusahaan Daerah Prodexim (Untuk/ for WST)                         0,81%              3.329.677.373            (226.634.504)                             --                    --       3.103.042.869
   PT Kaltim Binasarana Konstruksi (Untuk/ for TTB)                    20,00%             1.633.633.428                    64.255                            --                    --       1.633.697.683
   Perusda Benuo Taka (Untuk/ for TTB)                                 15,00%             1.225.225.070                    48.192                            --                    --       1.225.273.262
   PT Panca Wira Usaha (Untuk/ for WBW)                                0,19%              1.452.888.533            (502.480.564)                             --                    --         950.407.969
   Perusda Komaba (Untuk/ for TTB)                                     5,00%                408.408.358                    16.064                            --                    --         408.424.422
   Koperasi Waskita (Untuk/ for WWE)                                   0,05%                   (997.753)               (148.711)                     4.527.259                     --            3.380.795
   Koperasi Waskita (Untuk/ for WKR)                                   0,01%                   1.416.744               (125.752)                            46                     --            1.291.038
   Koperasi Waskita (Untuk/ for WTR)                                   0,01%                   1.003.938                        --                           --                    --            1.003.938
   Koperasi Waskita (Untuk/ for WKI)                                   0,01%                     510.123               (475.324)                             --                    --               34.799
   Koperasi Waskita (Untuk/ for WBP)                                   0,01%                   (407.261)                    1.609                            --                    --            (405.652)
   Koperasi Waskita (Untuk/ for TJT)                                   0,00%                 (5.070.147)                 (92.250)                            --              500.000           (4.662.397)
   Perusahaan Daerah Bende Seguguk (Untuk/ for WST)                    1,00%                 83.562.318            (278.760.439)                             --                    --       (195.198.121)
   Jumlah/ Total                                                                      5.145.339.569.353        (247.868.580.361)                 (102.606.851)     1.422.359.720.822    6.319.728.102.963




51. LABA (RUGI) PER SAHAM                                                                            51. EARNING (LOSS) PER SHARE

   Berikut ini adalah data yang digunakan untuk                                                               Following the details of the calculation of basic
   perhitungan laba (rugi) per saham dasar:                                                                   earning (loss) per share:
                                                                                30 September/ September 30,
                                                                                 2024                2023
                                                                                  Rp                  Rp
   Rugi Bersih yang Diatribusikan                                                                                                                                        Net Loss Attributable
    Kepada Entitas Induk                                               (3.002.298.222.784)                 (2.834.191.951.779)                                            to Parent Entity
   Rata - rata Bertimbang Saham                                             28.806.807.016                      28.806.807.016                                    Weighted Average of Shares
   Rugi Per Saham Dasar                                                              (104,22)                               (98,39)                                                Loss Per Shares


52. BANK GARANSI DAN LETTER OF CREDIT                                                               52. BANK GUARANTEE AND LETTER OF CREDIT

   Pada tanggal 30 September 2024 dan 31 Desember                                                             As at September 30, 2024 and December 31, 2023,
   2023, Perusahaan telah mendapatkan fasilitas bank                                                          the Company has obtained the bank guarantees,
   garansi, L/C dan SKBDN sebagai berikut:                                                                    LC and SKBDN facility as follows:

                                                                                                                                        30 September/                       31 Desember/
                                                                                                                                      September 30, 2024                  December 31, 2023
                                                                                                                                             Rp                                  Rp
   Pihak Berelasi/ Related Parties
    Perusahaan/ the Company
     PT Bank Rakyat Indonesia (Persero) Tbk                                                                                                1.700.000.000.000                    1.700.000.000.000
     PT Bank Mandiri (Persero) Tbk                                                                                                         1.700.000.000.000                    1.700.000.000.000
     PT Bank Negara Indonesia (Persero) Tbk                                                                                                  645.000.000.000                      645.000.000.000
     Indonesia Eximbank                                                                                                                                    --                     147.643.640.346
   Jumlah/ Total                                                                                                                           4.045.000.000.000                    4.192.643.640.346




                                                                                             - 192 -
Page 196
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                         PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                             FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                                       FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                             ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                                     AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                              (Expressed in Rupiah, unless otherwise stated)


   Perusahaan juga memiliki fasilitas bank garansi, L/C                                                                                    The Company also obtained bank guarantess, L/C
   dan SKBDN yang telah digunakan sebagai berikut:                                                                                         and SKBDN facilities with the total usage as follows:

                                                                                                                                                                              30 September/                                   31 Desember/
                                                                                                                                                                            September 30, 2024                              December 31, 2023
                                                                                                                                                                                   Rp                                              Rp
   Pihak Berelasi/ Related Parties
    Perusahaan/ the Company
     PT Bank Rakyat Indonesia (Persero) Tbk                                                                                                                                         200.874.479.345                              417.820.423.158
     PT Bank Mandiri (Persero) Tbk                                                                                                                                                  204.839.600.397                              524.762.455.644
     PT Bank Negara Indonesia (Persero) Tbk                                                                                                                                          50.494.457.692                              201.107.976.137
     Indonesia Eximbank                                                                                                                                                                           --                             147.643.640.346
   Jumlah/ Total                                                                                                                                                                     456.208.537.434                           1.291.334.495.285


53. INFORMASI ARUS KAS                                                                                                       53. CASHFLOW INFORMATION

   a.   Transaksi Non-Kas                                                                                                                  a. Non-Cash Transaction

        Tabel di bawah ini menunjukkan transaksi non-                                                                                               The below table shows the Group’s non-cash
        kas Grup selama tahun berjalan adalah sebagai                                                                                               transactions during the year:
        berikut:
                                                                                           30 September/                                    31 Desember/
                                                                                         September 30, 2024                               December 31, 2023
                                                                                                Rp                                               Rp

        Penambahan Aset Tetap Melalui                                                                                                                                                               Acquisition of Fixed Asset Through
         Utang Usaha                                                                                                              --                        3.069.336.529                                             Accounts Payable
        Penambahan Aset Tak Berwujud Melalui                                                                                                                                                     Acquisition of Intangible Asset Through
         Liabilitas                                                                                    24.229.356.784                                738.505.870.657                                                          Liabilities
        Penambahan Aset Hak Guna Melalui                                                                                                                                                           Acquisition of Lease Assets Through
         Sewa Pembiayaan                                                                                2.353.567.625                                 13.535.563.533                                                     Finance Lease
        Jumlah                                                                                         26.582.924.409                                755.110.770.719                                                                Total


   b. Rekonsiliasi Liabilitas                                  Yang                 Timbul             Dari                              b.         Reconciliation of liabilities                                             arising                 from
      Aktivitas Pendanaan                                                                                                                           financing activities
        Tabel di bawah ini menjelaskan perubahan dalam                                                                                              The table below explains the changes in
        liabilitas Grup yang timbul dari aktivitas                                                                                                  the Group’s liabilities arising from financing
        pendanaan, termasuk perubahan yang timbul dari                                                                                              activities, including both cash and non-cash
        arus kas dan perubahan nonkas. Liabilitas yang                                                                                              changes. Liabilities arising from financing
        timbul dari aktivitas pendanaan adalah liabilitas                                                                                           activities are those for which cash flows were, or
        yang arus kas, atau arus kas masa depannya,                                                                                                 future cash flows will be, classified in the Group’s
        diklasifikasikan dalam laporan arus kas                                                                                                     consolidated statement of cash flows as cash
        konsolidasian Grup sebagai arus kas dari                                                                                                    flows from financing activities.
        aktivitas pendanaan.
                                                                           Arus Kas dari Aktivitas Pendanaan/                                       Perubahan Transaksi non Kas/
                                           1 Januari/                            Financing Cash Flows                                                    Non-cash Changes                              30 September/
                                           January 1,          Penambahan/           Pembayaran/              Biaya Emisi/              Amortisasi/        Restrukturisasi/      Sewa Pembiayaan/      September 30,
                                              2023              Additional             Payment               Issuance cost             Amortization       Restructurisation        Finance Lease           2024
                                               Rp                  Rp                     Rp                      Rp                       Rp                    Rp                     Rp                  Rp
        Pinjaman Bank                     47.839.189.027.957       6.114.900.000     (1.770.445.269.144)                     --                        --      369.351.428.437                    --   46.444.210.087.250                                  Bank Loans
        Utang Lembaga Keuangan Non-Bank    5.785.277.386.796      98.887.833.204         (8.327.931.762)                     --                        --      388.827.323.318                    --    6.264.664.611.556      Loan to Financial Institution Non-Bank
        Utang Obligasi                     8.828.624.933.131                   --                     --                     --           16.015.530.048                     --                   --    8.844.640.463.179                              Bonds Payable
        Utang Sukuk Mudharabah             1.145.181.107.470                   --                     --                     --              268.121.076                     --                   --    1.145.449.228.546                Sukuk Mudharabah Payable
        Surat Utang Jangka Menengah          735.727.511.026                   --                     --                     --                        --       42.218.247.261                    --      777.945.758.287                        Medium Term Notes
        Liabilitas Sewa                       27.938.505.597                   --       (19.431.509.635)                     --                        --                    --       5.414.152.893        13.921.148.855                              Lease Liabilities
        Jumlah                            64.361.938.471.977     105.002.733.204     (1.798.204.710.541)                     --           16.283.651.124       800.396.999.016        5.414.152.893    63.490.831.297.673                                         Total




                                                                                                                     - 193 -
Page 197
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                         PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                     AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                      NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                             FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                                       FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                             ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                                     AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                              (Expressed in Rupiah, unless otherwise stated)

                                                                             Arus Kas dari Aktivitas Pendanaan/                                     Perubahan Transaksi non Kas/
                                           1 Januari/                              Financing Cash Flows                                                  Non-cash Changes                                     31 Desember/
                                           January 1,            Penambahan/           Pembayaran/              Biaya Emisi/            Amortisasi/         Utang Bank/          Sewa Pembiayaan/             December 31,
                                              2023                Additional             Payment               Issuance cost           Amortization          Bank Loan             Finance Lease                  2023
                                               Rp                    Rp                     Rp                      Rp                     Rp                    Rp                     Rp                         Rp
        Pinjaman Bank                     47.563.432.430.672        22.417.782.389         (306.414.138.026)                   --                      --        559.752.952.921                        --    47.839.189.027.957                                 Bank Loans
        Utang Lembaga Keuangan Non-Bank    4.538.846.968.540       928.545.091.603          (25.961.986.811)                   --                      --        343.847.313.464                        --     5.785.277.386.796     Loan to Financial Institution Non-Bank
        Utang Obligasi                    10.659.386.827.469                     --                       --                   --         20.008.026.773     (1.850.769.921.111)                        --     8.828.624.933.131                             Bonds Payable
        Utang Sukuk Mudharabah             1.144.905.871.186                     --                       --                   --            275.236.284                       --                       --     1.145.181.107.470               Sukuk Mudharabah Payable
        Surat Utang Jangka Menengah          725.000.000.000                     --                       --                   --                      --         10.727.511.026                        --       735.727.511.026                       Medium Term Notes
        Liabilitas Sewa                       38.410.896.550                     --         (24.007.954.486)                   --                      --                      --          13.535.563.533         27.938.505.597                             Lease Liabilities
        Jumlah                            64.669.982.994.417       950.962.873.992         (356.384.079.323)                   --         20.283.263.057       (936.442.143.700)           13.535.563.533     64.361.938.471.977                                        Total



54. ASET DAN LIABILITAS MONETER DALAM MATA                                                                                          54. MONETARY ASSETS                                                      AND               LIABILITIES                            IN
    UANG ASING                                                                                                                          FOREIGN CURRENCY

   Pada tanggal 30 September 2024 dan 31 Desember                                                                                          As at September 30, 2024 and December 31, 2023,
   2023, Perusahaan mempunyai aset dan liabilitas                                                                                          the Company have monetary assets and liabilities
   moneter dalam mata uang asing sebagai berikut:                                                                                          denominated in foreign currencies were as follows:

                                                                                                                     30 September/ September 30, 2024                                                31 Desember/ December 31, 2023
                                                                                                                  Mata Uang Asing/        Ekuivalen/                                            Mata Uang Asing/         Ekuivalen/
                                                                                                                  Foreign Currency        Equivalent                                            Foreign Currency         Equivalent
   Aset/ Assets
    Kas dan Setara Kas/
     Cash and Cash Equivalents                                                                USD                                   50.773                        768.604.324                                        119.559                        1.843.116.792
                                                                                              YEN                              201.622.830                     21.304.355.339                                     68.300.019                        7.482.065.619
                                                                                             EURO                                      552                          9.294.215                                            551                            9.446.789
                                                                                              SAR                                   32.505                        131.182.201                                         31.913                          131.182.201
                                                                                              MYR                                    3.354                         12.328.016                                          3.689                           12.328.016
    Piutang Usaha/
     Accounts Receivable                                                                      SAR                               12.020.408                     48.511.061.259                                     12.893.701                      53.000.910.398
                                                                                              USD                                3.272.267                     49.535.573.253                                      1.511.626                      23.303.223.698
    Piutang Retensi/
     Retention Receivables                                                                    SAR                                   5.517.591                 22.267.480.770                                       6.740.551                     27.707.741.349
                                                                                              USD                                   7.074.984                107.101.109.779                                       6.712.071                    103.473.281.741
    Tagihan Bruto Kepada Pengguna Jasa/
     Gross Amount Due From Customers                                                          USD                                   7.912.996                119.786.926.773                                       6.062.256                      93.455.741.459
   Jumlah/ Total                                                                                                                                             369.427.915.929                                                                    310.419.038.062

   Liabilitas/ Liabilities
    Utang Usaha/ Accounts Payable                                                             USD                                   6.043.674                  91.489.142.495                                      5.283.049                      81.443.478.797

    Utang Bruto Subkontraktor Jangka Pendek/
     Short-Term Gross Amount Due to Subcontractors                                            USD                                    287.388                    4.350.479.978                                       154.140                         2.376.215.919
   Jumlah/ Total                                                                                                                                               95.839.622.473                                                                     83.819.694.716



55. SEGMEN OPERASI                                                                                                              55. OPERATION SEGMENT

   a.     Informasi tentang Produk dan Jasa                                                                                                a.        Information                           Related                   to            Products                    and
                                                                                                                                                     Services

          Segmen operasi Perusahaan dikelompokkan                                                                                                    The Company’s operation segment is grouped
          berdasarkan pekerjaan yang dilakukan.                                                                                                      based on the work performed.

          Informasi Segmen berdasarkan jenis usaha/                                                                                                  Details of information of segment based on the
          produk adalah sebagai berikut:                                                                                                             type of business/ product were as follows:
                                                                                                                     30 September/ September 30, 2024
                                                           Konstruksi/          Sewa Gedung/           Properti & Hotel/    Beton Pracetak/ Infrastruktur Lainnya/                  Tol/                Jumlah/
                                                          Constructions         Building Rental        Property & Hotel        Precast         Others Infrastructure                Toll                 Total
                                                               Rp                      Rp                    Rp                   Rp                    Rp                           Rp                   Rp
           Pendapatan Usaha                                4.751.782.002.285          8.524.934.703       213.382.056.441      923.072.266.008          51.990.979.466       834.625.408.174          6.783.377.647.077                                          Revenues
           Beban Pokok Pendapatan                          4.477.748.804.350                      --      159.242.898.405      710.081.692.610          39.708.845.267       365.875.834.669          5.752.658.075.301                                  Cost of Revenues
           Laba Bruto                                        274.033.197.935          8.524.934.703        54.139.158.036      212.990.573.398          12.282.134.199       468.749.573.505          1.030.719.571.776                                        Gross Profit




                                                                                                                        - 194 -
Page 198
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                                          PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                                      AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                                       NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                                              FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                                                        FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                                              ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                                                      AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                                               (Expressed in Rupiah, unless otherwise stated)

                                                                                                                          30 September/ September 30, 2024
                                                      Konstruksi/              Sewa Gedung/                 Properti & Hotel/    Beton Pracetak/ Infrastruktur Lainnya/                                       Tol/                                  Jumlah/
                                                     Constructions             Building Rental              Property & Hotel        Precast         Others Infrastructure                                     Toll                                   Total
                                                          Rp                          Rp                          Rp                   Rp                    Rp                                                Rp                                     Rp


        Tidak Dapat Dialokasikan:                                                                                                                                                                                                                                                                        Unallocated:
        Beban Usaha                                                   --                          --                             --                               --                              --                             --              (1.270.179.546.125)                             Operating Expenses
        Penghasilan Lain-lain - Bersih                                --                          --                             --                               --                              --                             --                  431.149.405.834                            Other Revenues - Net
        Laba Sebelum Pajak dan Beban Keuangan                         --                          --                             --                               --                              --                             --                  191.689.431.485        Income Before Tax and Financial Charges
        Beban Keuangan                                                --                          --                             --                               --                              --                             --              (3.458.919.538.316)                               Financial Charges
        Bagian Rugi Bersih Entitas Asosiasi                                                                                                                                                                                                                                          Equity in Net Loss of Associates
          dan Ventura Bersama                                         --                          --                             --                               --                              --                             --                (304.092.133.359)                             and Joint Ventures
        Rugi Sebelum Pajak                                            --                          --                             --                               --                              --                             --              (3.571.322.240.190)                                 Loss Before Tax
        Beban Pajak Penghasilan                                       --                          --                             --                               --                              --                             --                 (43.169.807.777)                           Income Tax Expenses
        Rugi Bersih Periode Berjalan                                                                                                                                                                                                             (3.614.492.047.967)                  Loss Profit in Current Period


                                                                                                                            30 September/ September 30, 2023
                                                      Konstruksi/               Sewa Gedung/                  Properti & Hotel/     Beton Pracetak/ Infrastruktur Lainnya/                                           Tol/                               Jumlah/
                                                     Constructions              Building Rental               Property & Hotel         Precast         Others Infrastructure                                         Toll                                Total
                                                          Rp                           Rp                           Rp                    Rp                    Rp                                                    Rp                                  Rp
        Pendapatan Usaha                              6.361.216.264.307              7.431.443.252               198.960.356.204                 372.694.031.192                     45.384.160.692           830.775.748.001                          7.816.462.003.648                                   Revenues
        Beban Pokok Pendapatan                        6.186.676.325.427                          --              158.934.789.533                 308.089.200.592                     35.187.642.861           353.643.026.452                          7.042.530.984.865                           Cost of Revenues
        Laba Bruto                                      174.539.938.880              7.431.443.252                40.025.566.671                  64.604.830.600                     10.196.517.831           477.132.721.549                            773.931.018.783                                 Gross Profit
        Tidak Dapat Dialokasikan:                                                                                                                                                                                                                                                                       Unallocated:
        Beban Usaha                                                       --                           --                             --                                --                             --                                  --        (1.547.124.003.278)                        Operating Expenses
        Penghasilan Lain-lain - Bersih                                    --                           --                             --                                --                             --                                  --          1.141.059.440.405                       Other Revenues - Net
        Laba Sebelum Pajak dan Beban Keuangan                             --                           --                             --                                --                             --                                  --            367.866.455.910   Income Before Tax and Financial Charges
        Beban Keuangan                                                    --                           --                             --                                --                             --                                  --        (3.169.529.872.152)                          Financial Charges
        Bagian Rugi Bersih Entitas Asosiasi                                                                                                                                                                                                                                         Equity in Net Loss of Associates
          dan Ventura Bersama                                             --                           --                             --                                --                             --                                  --          (226.797.319.280)                        and Joint Ventures
        Rugi Sebelum Pajak                                                --                           --                             --                                --                             --                                  --        (3.028.460.735.522)                            Loss Before Tax
        Beban Pajak Penghasilan                                           --                           --                             --                                --                             --                                  --          (206.201.790.587)                      Income Tax Expenses
        Rugi Bersih Periode Berjalan                                                                                                                                                                                                                 (3.234.662.526.109)                Net Loss in Current Period




                                                                                                                           30 September/ September 30, 2024
                                                      Konstruksi/              Sewa Gedung/                 Properti & Hotel/              Beton Pracetak/             Infrastruktur Lainnya/                Tol/                                 Jumlah/
                                                     Constructions             Building Rental              Property & Hotel                  Precast                  Others Infrastructure                 Toll                                   Total
                                                          Rp                          Rp                          Rp                            Rp                              Rp                            Rp                                     Rp
        Aset                                                                                                                                                                                                                                                                                               Assets
          Piutang Usaha                              3.160.363.637.040            18.275.540.141                            --               633.578.954.405                                 --                             --                   3.812.218.131.586                        Accounts Receivable
          Piutang Retensi                            1.605.479.716.135                         --                           --                             --                                --                             --                   1.605.479.716.135                        Retention Receivable
          Tagihan Bruto Kepada Pengguna Jasa         4.437.324.332.330                         --                           --                             --                                --                             --                   4.437.324.332.330           Gross Amount Due from Customers
          Persediaan                                   243.667.512.352                         --           3.782.813.888.582                108.797.405.173                    20.632.791.859                              --                   4.155.911.597.966                                  Inventories
          Aset Tak Berwujud                                                                                                                                                                                                                                                                   Intangible Assets
            Hak Pengusahaan Jalan Tol                                --                          --                             --                           --                              -- 42.119.156.940.187                              42.119.156.940.187              Toll Road Concession Rights
          Aset yang Tidak Dapat Dialokasikan                         --                          --                             --                           --                              --                  --                             32.542.076.969.293                         Unallocated Assets
        Jumlah Aset                                                                                                                                                                                                                             88.672.167.687.497                                  Total Assets
        Liabilitas                                                                                                                                                                                                                                                                                      Liabilities
          Utang Usaha                                3.527.628.031.687                           --                         --              1.102.767.884.035                  101.962.048.182              1.393.656.555                        4.733.751.620.458                           Accounts Payable
          Utang Bruto Subkontraktor                  1.330.850.549.499                           --            32.422.504.363                 170.541.963.851                    3.313.824.575                          --                       1.537.128.842.288          Gross Amount Due to Subcontractors
          Liabilitas yang Tidak Dapat Dialokasikan                   --                          --                         --                              --                               --                         --                      74.310.113.164.484                       Unallocated Liabilities
        Jumlah Liabilitas                                                                                                                                                                                                                       80.580.993.627.230                                Total Liabilities


                                                                                                                                31 Desember/ December 31, 2023
                                                      Konstruksi/               Sewa Gedung/                 Properti & Hotel/               Beton Pracetak/                 Infrastruktur Lainnya/                 Tol/                               Jumlah/
                                                     Constructions             Building Rental               Property & Hotel                    Precast                     Others Infrastructure                  Toll                                Total
                                                          Rp                          Rp                           Rp                              Rp                                 Rp                             Rp                                  Rp
        Aset                                                                                                                                                                                                                                                                                             Assets
          Piutang Usaha                              1.393.558.875.571              6.672.156.663                             --                520.124.945.565                                  --                                   --             1.920.355.977.799                   Accounts Receivable
          Piutang Retensi                            1.490.267.616.686                          --                            --                              --                                 --                                   --             1.490.267.616.686                  Retention Receivable
          Tagihan Bruto Kepada Pengguna Jasa         4.496.709.067.451                          --                            --                              --                                 --                                   --             4.496.709.067.451      Gross Amount Due from Customers
          Persediaan                                   260.147.584.898                          --            3.763.731.218.414                 145.619.908.820                     22.965.816.005                                    --             4.192.464.528.137                            Inventories
          Aset yang Tidak Dapat Dialokasikan                         --                         --                            --                              --                                 --                                   --            83.496.100.267.894                    Unallocated Assets
        Jumlah Aset                                                                                                                                                                                                                                 95.595.897.457.967                            Total Assets
        Liabilitas                                                                                                                                                                                                                                                                                    Liabilities
          Utang Usaha                                5.839.016.918.891                                --                      --                              --                                 --                                   --             5.839.016.918.891                     Accounts Payable
          Utang Bruto Subkontraktor                  1.450.400.358.668                                --         32.526.744.384                 201.746.143.353                      3.040.123.510                                    --             1.687.713.369.915     Gross Amount Due to Subcontractors
          Liabilitas yang Tidak Dapat Dialokasikan                   --                               --                      --                              --                                 --                                   --            76.467.655.618.002                  Unallocated Liabilities
        Jumlah Liabilitas                                                                                                                                                                                                                           83.994.385.906.808                          Total Liabilities




                                                                                                                                     - 195 -
Page 199
PT WASKITA KARYA (PERSERO) Tbk                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                   (Expressed in Rupiah, unless otherwise stated)


56. PERKARA HUKUM                                          56. LEGAL CASES

   1.   Perkara Gugatan Melawan Hukum Proyek                      1.   Lawsuits Against the Law of the Becakayu
        Tol Becakayu                                                   Toll Road Project
        Roswinawaty Sitompul mengajukan gugatan ke                     Roswinawaty Sitompul filed a lawsuit with the
        Pengadilan Negeri Jakarta Timur dengan                         East Jakarta District Court with Case No.
        Perkara No. 502/Pdt.G/2018/PN.Jkt.Tim dengan                   502/Pdt.G/2018/PN.Jkt.Tim with the defendant:
        tergugat:
        1. Ahli Waris Alm. H. Asmawih (Tergugat I);                    1. The Heir Alm H Asmawih (Defendant I);
        2. Kementrian PUPR (Tergugat II);                              2. Ministry of PUPR (Defendant II);
        3. Pemerintah Provinsi DKI Jakarta Cq Panitia                  3. DKI Jakarta Provincial Government Cq
           Pengadaan Tanah untuk Kepentingan                              Land Procurement Committee for Public
           Umum (Tergugat III);                                           Interest (Defendant III);
        4. Perusahaan Umum Jasa Tirta II (Tergugat                     4. Jasa Tirta II Public Company (Defendant
           IV);                                                           IV);
        5. Badan Pertanahan Nasional RI (Tergugat                      5. Indonesia      National   Land    Agency
           V);                                                            (Defendant V);
        6. Pemprov Jakarta Cq Kecamatan Makasar                        6. Jakarta Provincial Government Cq Makasar
           (Tergugat VI);                                                 District (Defendant VI);
        7. Pemprov Jakarta Cq Kecamatan Cipinang                       7. Jakarta Provincial Government Cq Cipinang
           (Tergugat VII);                                                District (Defendant VII);
        8. Perusahaan (Tergugat VIII).                                 8. The Company (Defendant VIII).
        Nilai Gugatan    yang     diajukan   sebesar                   The value of lawsuit          filed   amounting   to
        Rp6.428.796.000.                                               Rp6,428,796,000.
        Pada tanggal 5 November 2019 telah dibacakan                   On November 5 2019, the District Court
        putusan      Pengadilan      Negeri,     No.                   decision, No. 502/Pdt.G/2018/PN.Jkt.Tim dated
        502/Pdt.G/2018/PN.Jkt.Tim tanggal 5 November                   November 5 2019 with the following instructions:
        2019 dengan amarnya sebagai berikut :
        Dalam Pokok Perkara :                                          In the main case:
        Menolak Gugatan Para       Penggugat   untuk                   Reject the Plaintiffs' Claim in its entirety.
        seluruhnya.

        Dalam Rekonvensi :                                             In Reconvention:
        Menolak gugatan Para Penggugat Rekonvensi/                     Reject the lawsuit of the Reconvention
        Para Tergugat I Konvensi untuk seluruhnya.                     Plaintiffs/Convention I Defendants in its entirety.

        Pada tanggal 30 September 2021 telah                           On September 30 2021, the high court's
        dibacakan putusan pengadilan tinggi dengan                     decision was read out with the following ruling:
        amarnya sebagai berikut:

        Menguatkan putusan Pengadilan Negeri Jakarta                   Strengthening the decision of the East Jakarta
        Timur tanggal 5 November 2019 Nomor                            District Court dated November 5 2019 Number
        502/Pdt.G/2018/PN.Jkt.Tim, yang dimohonkan                     502/Pdt.G/2018/PN.Jkt.Tim, which is requested
        banding.                                                       for appeal.

        Pada tanggal 7 Desember 2021 telah diterima                    On December 7, 2021, it has been accepted
        surat panggilan (relaas) penyerahan kontra                     that the submission of the counter memorandum
        memori kasasi atas perkara a quo.                              of cassation for the a quo case has been
                                                                       received.

        Sampai dengan tanggal pelaporan Perusahaan                     As of the reporting date, the Company is still
        masih   memonitor   putusan    kasasi  dari                    monitoring the cassation decision from
        Mahkamah Agung atas perkara a quo.                             the Supreme Court regarding the a quo case.

   2.   Perkara Gugatan Perbuatan Melawan Hukum                   2.   Lawsuit Against the Law on Unlawful
        Ganti Rugi atas Pembangunan Proyek Jalan                       Indemnity for      the    Construction     of
        Tol Cimanggis Cibitung II                                      the Cimanggis Cibitung II Toll Road Project

        PT Agung Graha Persada Utama mengajukan                        PT Agung Graha Persada Utama filed a lawsuit
        gugatan ke Pengadilan Negeri Jakarta Selatan                   to Jakarta Selatan District Court with Case No.
                                                        - 196 -
Page 200
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

        dengan Perkara No. 641/Pdt.g/2020/PN.Jkt.Sel                    641/Pdt.g/2020/PN.Jkt.Sel       with the Company
        dengan Perusahaan sebagai Turut Tergugat II.                    as co-Defendant II.

        Pada tanggal 11 Oktober 2021 diadakan sidang                    On October 11, 2021, a session will be held with
        dengan agenda Pembacaan Putusan Sela yang                       the agenda for Reading the Interlocutory
        amarnya sebagai berikut:                                        Decision, the order of which is as follows:

        1.   Mengabulkan Eksepsi Tergugat II tentang                    1.   Granted Defendant II's Exception regarding
             kompetensi relatif.                                             relative competence.
        2.   Menyatakan bahwa Pengadilan Negeri                         2.   To declare that the South Jakarta District
             Jakarta Selatan tidak berwenang secara                          Court has no relative authority to examine
             relatif untuk memeriksa dan mengadili                           and adjudicate the a quo case.
             Perkara a quo.
        3.   Menghukum Penggugat untuk membayar                         3.   Sentencing the Plaintiff to pay the costs
             biaya yang timbul dari     Perkara   ini                        arising from this case amounting to
             sejumlah Rp3.708.800.                                           Rp3,708,800.

        Pada tanggal 2 Februari 2023 agenda                             On February 2, 2023, the agenda for reading
        pembacaan Putusan Banding dengan amar                           the Appeal Decision is as follows:
        sebagai berikut:

        1.   Menerima permohonan banding dari                           1.   Received the original Appellant's appeal
             Pembanding semula Penggugat;                                    from the Plaintiff;
        2.   Menguatkan putusan Pengadilan Negeri                       2.   Strengthening the decision of the South
             Jakarta Selatan Nomor 641/Pdt.G/2020/PN                         Jakarta      District     Court       Number
             Jkt.Sel tanggal 11 Oktober 2021;                                641/Pdt.G/2020/PN Jkt.Sel dated 11
                                                                             October 2021;
        3.   Menghukum         Pembanding       semula                  3.   Sentenced the plaintiff's original appellant to
             Penggugat untuk membayar biaya perkara                          pay the costs of the case at both court
             dalam kedua tingkat peradilan, yang dalam                       levels, which at the appeal level amounted
             tingkat banding sebesar Rp150.000.                              to Rp150,000.

        Pada tanggal 15 Mei 2023 Penggugat telah                        On May 15, 2023, the Plaintiff filed an appeal
        mengajukan Kasasi atas Putusan Banding                          against the appeal decision in the a quo case;
        Perkara a quo;

        Pada tanggal 29 Mei 2023 telah diserahkan                       On May 29, 2023 the Cassation Memorandum
        Memori Kasasi atas Perkara a quo.                               regarding the a quo case was submitted.

        Sampai dengan tanggal pelaporan Perusahaan                      As of the reporting date, the Company is still
        masih memonitor putusan kasasi atas perkara a                   monitoring the cassation decision on the a quo
        quo.                                                            case.

   3.   Perkara Gugatan Melawan Hukum Proyek                       3.   Case of Unlawful Acts of the Cibitung -
        Pembangunan Jalan Tol Cibitung - Cilincing                      Cilincing II Tol Development Project
        II
        Tio Melya mengajukan gugatan ke Pengadilan                      Tio Melya filed a lawsuit with the North Jakarta
        Negeri Jakarta       Utara    dengan Perkara                    District      Court       with      a      case
        No.       644/Pdt.g/2022/PN.Jkt.Ut      dengan                  No. 644/Pdt.g/2022/PN.Jkt.Ut        with     the
        Perusahaan sebagai Tergugat. Nilai Gugatan                      Company as Defendant. The material lawsuit
        materiil yang diajukan sebesar Rp7.730.828.601                  filed was Rp7,730,828,601 and the immaterial
        dan imateriil sebesar Rp2.000.000.000.                          filed was Rp2,000,000,000.
        Pada tanggal 31 Mei 2023 diadakan sidang                        On May 31, 2023 a hearing was held with
        dengan    agenda      pembacaan  putusan                        the agenda for reading the decision of the North
        Pengadilan Negeri Jakarta Utara dengan                          Jakarta District Court with the following orders:
        amarnya sebagai berikut :
        1.   Mengabulkan Gugatan Para Penggugat                         1.   Granted the Plaintiffs' Claim in part;
             untuk sebagian;
        2.   Menyatakan Tergugat 1 dan Tergugat 2                       2.   Declare that Defendant 1 and Defendant 2
             telah melakukan perbuatan melawan                               have committed an unlawful act which is
             hukum yang merugikan Penggugat;                                 detrimental to the Plaintiff;
        3.   Menghukum Tergugat 2 untuk membayar                        3.   Sentenced Defendant 2 to pay land
                                                         - 197 -
Page 201
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

             ganti kerugian tanah atas penggunaan dan/                         compensation for the use and/ or
             atau pengadaan tanah untuk Proyek Jalan                           procurement of land for the Cibitung -
             Tol Cibitung - Cilincing kepada Penggugat 1                       Cilincing Toll Road Project to Plaintiff 1 in
             sebesar Rp7.367.497.782.                                          the amount of Rp7,367,497,782.
        4.   Menghukum Tergugat 2 untuk membayar                          4.   Ordered Defendant 2 to pay land
             ganti kerugian tanah atas penggunaan dan/                         compensation for the use and/ or
             atau pengadaan tanah untuk Proyek Jalan                           procurement of land for the Cibitung
             Tol Cibitung-Cilincing kepada Penggugat 2                         Cilincing Toll Road Project to Plaintiff 2 in
             sebesar Rp363.330.819.                                            the amount of Rp363,330,819.
        Pada tanggal 21 Agustus 2023 agenda                               On August 21, 2023, the agenda for reading
        pembacaan Putusan Banding dengan amar                             the Appeal Decision is as follows:
        sebagai berikut:

        1.   Menerima permohonan banding dari                             1.   Received the original Appellant's appeal
             Pembanding;                                                       from the Plaintiff;
        2.   Menguatkan putusan Pengadilan Negeri                         2.   Strengthening the decision of the North
             Jakarta Utara atas perkara a quo;                                 Jakarta District Court regarding the a quo
                                                                               case;
        3.   Menghukum Pembanding untuk membayar                          3.   Sentenced the appellant to pay the court
             biaya perkara yang timbul atas perkara a                          costs in the a quo case;
             quo
        Pada tanggal 5 September 2023 Tergugat I dan                      On September 5 2023, Defendants I and II filed
        II mengajukan Kasasi atas perkara a quo.                          a cassation regarding the a quo case.

        Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
        masih memonitor pelaksanaan kasasi.                               monitoring the implementation of the cassation.
   4.   Perkara Gugatan Perbuatan Melawan Hukum                      4.   Case of Unlawful Accidents                  on     the
        Kecelakaan di Ruas Tol Kayuagung - Mesuji                         Kayuagung - Mesuji Toll Road
        Sukandar dkk mengajukan gugatan ke                                Sukandar et al filed a lawsuit with the
        Pengadilan Negeri Kayuagung dengan Perkara                        Kayuagung District Court with a case
        No. 2/Pdt.G/2023/PN.Kag dengan Perusahaan                         No. 2/Pdt.G/2023/PN.Kag with the Company as
        sebagai Tergugat. Nilai Gugatan materiil yang                     Defendant. The material lawsuit filed was
        diajukan sebesar Rp1.897.242.828 dan imateriil                    Rp1,897,242,828 and the immaterial filed was
        sebesar Rp10.000.000.000.                                         Rp10,000,000,000.
        Pada tanggal 21 Juni 2023 diadakan sidang                         On June 21, 2023 a trial was held with an
        dengan agenda pemeriksaan saksi.                                  agenda for examining witnesses.
        Pada tanggal 21 September 2023 diadakan                           On September 21 2023, a trial was held with a
        sidang dengan agenda putusan namun ditunda.                       decision agenda but it was postponed.
        Pada tanggal 9 Oktober 2023 diadakan sidang                       On October 9 2023, a trial was held with
        dengan agenda pembacaan putusan yang                              the agenda for reading the verdict which was as
        amarnya sebagai berikut :                                         follows:
        -    Menerima dan mengabulkan Gugatan Para                        -    Accept and grant the Plaintiffs' lawsuit in
             Penggugat untuk sebagian;                                         part;
        -    Menyatakan Tergugat I,II dan III telah                       -    Declare that Defendants I, II and III have
             melakukan Perbuatan Melawan Hukum;                                committed unlawful acts;
        -    Menghukum Tergugat I, Tergugat II dan                        -    Sentence Defendant I, Defendant II and
             Tergugat III secara tanggung renteng untuk                        Defendant III jointly and severally to pay
             membayar kerugian kepada Penggugat I                              losses to Plaintiff I and Plaintiff II consisting
             dan Penggugat II terdiri dari kerugian                            of material losses for Plaintiff I amounting to
             materiil      Penggugat      I     sebesar                        Rp391,370,953 and the material loss of
             Rp391.370.953 dan kerugian materill                               Plaintiff II amounting to Rp255,652,616 and
             Penggugat II sebesar Rp255.652.616 serta                          also sentenced to pay compensation for
             dihukum pula untuk membayar ganti                                 the     immaterial      losses    suffered     by
             kerugian imateriil yang dialami oleh Para                         the          Plaintiffs      amounting          to
             Penggugat sebesar Rp5.000.000.000.                                Rp5,000,000,000.



                                                           - 198 -
Page 202
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


       Pada tanggal 10 Januari 2024 telah dibacakan                      On January 10, 2024, the appeal decision was
       putusan banding dengan amarnya sebagai                            read with the following ruling:
       berikut:
       Mengubah     putusan    Pengadilan     Negeri                     Amend the decision of the Kayuagung District
       Kayuagung Nomor 2/Pdt.G/2023/PN Kag                               Court Number 2/Pdt.G/2023/PN Kag dated
       tanggal 9 Oktober 2023 yang dimohonkan                            October,9 2023 which is being appealed, only
       banding tersebut, sekedar mengenai besarnya                       regarding   the    amount      of    immaterial
       ganti rugi immateril, sehingga          amar                      compensation, so that the full ruling reads as
       selengkapnya berbunyi sebagai berikut:                            follows:
       1. Menerima dan mengabulkan gugatan para                          1. Accept and partially grant the claim of the
          Terbanding semula para Penggugat untuk                            Respondents and the Plaintiffs;
          sebagian;
       2. Menyatakan Pembanding I semula Tergugat                        2. State that Appellant I was originally
          I, Pembanding II semula Tergugat II dan                           Defendant I, Appellant II was originally
          Pembanding III semula Tergugat III telah                          Defendant II and Appellant III was originally
          melakukan Perbuatan Merlawan Hukum;                               Defendant III who had committed unlawful
       3. Menyatakan Pembanding I semula Tergugat                           acts;
          I, Pembanding II semula Tergugat II dan                        3. Declare that Appellant I was originally
          Pembanding III semula Tergugat III                                Defendant I, Appellant II was originally
          bertanggungjawab secara tanggung renteng                          Defendant II and Appellant III was originally
          atas peristiwa kecelakaan lalu lintas yang                        Defendant       III   jointly   and     severally
          terjadi di KM 271 Tol Terpeka pada tanggal 1                      responsible for the traffic accident that
          Juni 2022;                                                        occurred at KM 271 of the Terpeka Toll Road
       4. Menghukum Pembanding I,II dan III semula                          on June 1 2022;
          Tergugat I,II dan III secara tanggung renteng                  4. Sentenced Appellants I, II and III, originally
          untuk      membayar       kerugian      kepada                    Defendants I, II and III, jointly and severally
          Terbanding I semula Penggugat I dan                               to pay losses to Appellee I, originally Plaintiff
          Terbanding II semula Penggugat II terdiri dari                    I, and Appellee II, originally Plaintiff II,
          kerugian Materil Terbanding I semula                              consisting of material losses to Appellee I,
          Penggugat I sebesar Rp391.370.935 (tiga                           originally Plaintiff I, amounting to Rp.
          ratus sembilan puluh satu juta tiga ratus tujuh                   391,370,935 ( three hundred ninety-one
          puluh ribu sembilan ratus tiga puluh lima                         million three hundred seventy thousand nine
          rupiah) dan kerugian materiil Penggugat II                        hundred thirty-five rupiah) and plaintiff II's
          sebesar Rp255.652.616 (dua ratus lima puluh                       material loss amounted to Rp. 255,652,616
          lima juta enam ratus lima puluh dua ribu                          (two hundred fifty-five million six hundred
          enam ratus enam belas rupiah) serta                               fifty-two thousand six hundred and sixteen
          dihukum pula membayar ganti kerugian                              rupiah) and was sentenced also pay
          Immateril yang dialami oleh Para Terbanding                       immaterial compensation suffered by the
          semula       Para      Penggugat       sebesar                    Appellees and the Plaintiffs amounting to
          Rp2.000.000.000 (dua miliar) rupiah;                              Rp2,000,000,000 (two billion) rupiah;
       5. Menolak gugatan para Terbanding semula                         5. Reject the claims of the Appellees and
          para Penggugat selain dan selebihnya;                             the Plaintiffs in addition to and in addition;
       Dalam Rekonvensi :                                                In Reconvention:
       Menguatkan Putusan Pengadilan Negeri                              Strengthens the decision of the Kayuagung
       Kayuagung yang dimohonkan banding tersebut.                       District Court which is being appealed.

       Dalam Konvensi dan Rekonvensi                                     In Conventions and Reconventions
       Menghukum Pembanding I semula Tergugat I,                         Sentenced Appellant I, originally Defendant I,
       Pembanding II semula Tergugat II dan                              Appellant II, originally Defendant II, and
       Pembanding III semula Tergugat III untuk                          Appellant III, originally Defendant III, to pay
       membayar biaya perkara secara tanggung                            the case costs jointly and severally at both
       renteng dalam kedua tingkat pengadilan yang                       levels of court, which for the Appellate level was
       untuk llngkat Banding sebesar Rp150.000,00                        Rp150,000.00 (one hundred and fifty thousand)
       (seratus lima puluh ribu) rupiah;                                 rupiah;

       Pada tanggal 23 Januari 2024 Para Tergugat                        On January 23 2024, the Defendants filed an
       menyatakan Kasasi atas Putusan Banding                            appeal against the appeal decision in the a quo
       Perkara a quo.                                                    case.


                                                            - 199 -
Page 203
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)


        Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
        masih memonitor pelaksanaan kasasi.                               monitoring the implementation of the cassation.
   5.   Perkara Gugatan Melawan Hukum Proyek                         5.   Lawsuit Case Against the Law of SUTT 150
        SUTT 150 Kv New Balikpapan - PLTU                                 Kv    New     Balikpapan     Project   -
        Kariangau                                                         PLTU Kariangau
        Robby Suleman Runtu dkk mengajukan                                Robby Suleman Runtu filed a lawsuit with
        gugatan ke Pengadilan Negeri Balikpapan                           the Balikpapan District Court with a case No.
        dengan Perkara No. 53/Pdt.G/2023/PN.Bpp                           53/Pdt.G/2023/PN.Bpp with the Company as
        dengan    Perusahaan       sebagai    Tergugat.                   Defendant. The Plaintiff stated that legally
        Penggugat     Menyatakan       Secara   hukum                     the ownership owned by the Plaintiffs was
        kepemilikan yang di miliki oleh Para Penggugat                    legally valid and entitled to compensation in
        sah secara hukum dan berhak atas uang                             the amount of Rp368,861,000.
        Kornpensasi sebesar Rp368.861.000.
        Pada tanggal 14 Desember 2023 telah                               On December 14, 2023, the District Court's
        dilakukan pembacaan Putusan Pengadilan                            decision was read with the following ruling:
        Negeri dengan amarnya sebagai berikut:
        Dalam Eksepsi                                                     In Exception
        Menyatakan Eksepsi Tergugat I,II,III tidak dapat                  Declare that the exceptions of Defendants I, II,
        diterima                                                          III cannot be accepted

        Dalam Pokok Perkara                                               In the Main Case
        1. Mengabulkan gugatan para Penggugat untuk                       1. Grant the Plaintiffs' lawsuit in part;
           sebagian;
        2. Menyatakan secara hukum Penggugat I,II,II                      2. Legally declare that Plaintiffs I, II, II are
           adalah pemilik Sah atas tanah yang                                the legal owners of the disputed land.
           disengketakan.
                                                                          In Reconvention
        Dalam Rekonvensi                                                  Rejecting   the   reconvention     lawsuit  of
        Menolak gugatan rekonvensi Para Penggugat                         the    Reconvention    Plaintiffs/Reconvention
        Rekoncensi/Tergugat I, II Rekonvensi.                             Defendants I, II.

        Dalam Konvensi dan Rekonvensi                                     In Conventions and Reconventions
        Menghukum Para Tergugat untuk membayar                            Sentencing the Defendants to pay court costs.
        biaya perkara.
        Pada tanggal 21 Maret 2024 diadakan sidang                        On March 21 2024, a hearing was held with the
        dengan agenda pembacaan Putusan Banding                           agenda of reading the Appeal Decision on the a
        atas Perkara a quo dengan amarnya sebagai                         quo case with the following ruling:
        berikut :
        1. Menerima permohonan banding dari Para                          1. Accept the appeal request from the original
           Pembanding semula Tergugat I dan Tergugat                         Appellants, Defendant I and Defendant II;
           II tersebut;
        2. Menguatkan putusan Putusan Pengadilan                          2. Strengthen the decision of the Balikpapan
           Negeri Balikpapan Niomor 53/Pdt.G/2023.PN                         District Court, Niomor 53/Pdt.G/2023.PN
           Bpp, tanggal 14 Desember 2023 tersebut;                           Bpp, dated 14 December 2023;
        3. Menghukum Para Pembanding semula                               3. Sentenced the original appellants, Defendant
           Tergugat I dan Tergugat II untuk membayar                         I and Defendant II, to pay court costs at both
           biaya perkara dalam kedua tingkat peradilan,                      levels of justice, which at the Appellate Level
           yang dalam Tingkat Banding ditetapkan                             was set at Rp.150,000.-.
           sejumlah Rp150.000,-.
        Pada tanggal 29 April 2024 Penggugat                              On April 29, 2024, the Plaintiff filed an appeal
        mengajukan Kasasi atas Putusan Banding                            against the appeal decision in the a quo case.
        Perkara a quo.
        Sampai dengan tanggal pelaporan Perusahaan                        As of the reporting date, the Company is still
        masih menunggu upaya hukum selanjutnya dari                       waiting for further legal action from the Parties.
        Para Pihak.


                                                           - 200 -
Page 204
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

   6.   Gugatan Perbuatan Melawan Hukum Proyek                    6.   Lawsuit on Unlawful Acts of the ITC Polonia
        ITC Polonia Medan                                              Medan Project
        PT ITC Polonia mengajukan gugatan ke                           PT ITC Polonia filed a lawsuit with the Medan
        Pengadilan Negeri Medan dengan Perkara No.                     District   Court    with    a     case    No.
        279/Pdt.g/2023/PN.Mdn dengan Perusahaan                        279/Pdt.g/2023/PN.Mdn with the Company as
        sebagai Tergugat. Nilai Gugatan materiil yang                  Defendant. The material claim value was
        diajukan sebesar Rp40.660.793.864 dan                          Rp40,660,793,864 and the immaterial claim was
        imateriil sebesar Rp15.000.000.000.                            Rp15,000,000,000.
        Pada tanggal 8 Mei 2023 diadakan sidang                        On May 8, 2023 a trial was held with the agenda
        dengan agenda sidang pertama                                   for the first session
        Pada tanggal 27 September 2023 diadakan                        On September 27, 2023, a trial was held with
        sidang dengan agenda saksi dari Penggugat                      the Plaintiff's witnesses as an agenda.
        Pada tanggal 30 November 2023 diadakan                         On November 30, 2023, a trial was held with
        sidang dengan agenda pembacaan putusan                         the agenda of reading the verdict with
        dengan amarnya sebagai berikut :                               the following ruling:
        1.   Mengabulkan Gugatan Para Penggugat                        1.   Granted the Plaintiff's lawsuit in part;
             untuk sebagian;
        2.   Menghukum Tergugat untuk membayar                         2.   Sentenced the Defendant to pay material
             kerugian        Materiil   sebesar                             losses amounting to Rp23,438,853,864 and
             Rp23.438.853.864 dan bunga sebesar                             interest amounting to Rp36,095,834,951.
             Rp36.095.834.951.
        Pada tanggal 8 Desember 2023 Perseroan                         On December 8, 2023, the Company submitted
        mengajukan Upaya Hukum Banding atas                            a legal appeal against the District Court's
        Putusan PN Perkara a quo.                                      decision in the a quo case.
        Pada tanggal 15 Februari 2024 dibacakan                        On February 15, 2024, the Appeal Decision
        Putusan Banding atas Putusan Pengadilan                        against the Medan District Court Decision was
        Negeri Medan dengan amarnya sebagai berikut:                   read with the following ruling:
        Mengadili :                                                    Judge:

        - Menerima     permohonan   banding   dari                     - Accept the appeal request from the original
          Pembanding semula sebagai Tergugat;                            Appellant as Defendant;
        - Membatalkan putusan Pengadilan Negeri                        - Cancel the decision of the Medan District
          Medan No.279/Pdt.G/2023/PN.Mdn tanggal                         Court No.279/Pdt.G/2023/PN.Mdn dated
          30 November 2023 yang dimohonkan                               November 30, 2023 which was requested for
          banding tersebut.                                              appeal.

        Mengadili Sendiri:                                             Judging:

        - Menyatakan Pengadilan Negeri Medan tidak                     - Declare that the Medan District Court has no
          berwenang mengadili perkara ini;                               authority to try this case;
        - Menghukum Terbanding semula Penggugat                        - Sentenced the original Appellee, Plaintiff, to
          untuk membayar biaya perkara dalam kedua                       pay court costs at both court levels, which for
          tingkat pengadilan yang untuk Pengadilan                       the appellate court amounted to Rp150,000,-
          tingkat banding sebesar Rp150.000,-
        Pada tanggal 27 Februari 2024 diajukan Kasasi                  On February 27, 2024, a cassation was filed
        atas Putusan Banding Perkara a quo.                            against the appeal decision in the a quo case.
        Sampai dengan tanggal pelaporan Perusahaan                     As of the reporting date, the Company monitors
        memonitor pelaksanaan kasasi.                                  the implementation of cassation.
   7.   Gugatan Pembatalan Putusan BANI Proyek                    7.   Lawsuit for Cancellation of BANI Decision
        ITC Polonia Medan                                              for ITC Polonia Medan Project
        PT ITC Polonia mengajukan gugatan ke                           PT ITC Polonia filed a lawsuit with the Medan
        Pengadilan Negeri Medan dengan Perkara No.                     District   Court    with    a     case    No.
        326/Pdt.g/2023/PN.Mdn dengan Perusahaan                        326/Pdt.g/2023/PN.Mdn with the Company as
        sebagai Tergugat. PT ITC Polonia menuntut                      Defendant. PT ITC Polonia demands Arbitration
        Putusan Arbitrase No. 1371 B/Pdt.Sus-                          Award No. 1371 B/Pdt.Sus-Arbt/2022 dated
                                                        - 201 -
Page 205
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

        Arbt/2022 tanggal 20 September 2022 telah                       September 20, 2022 has violated the provisions
        melanggar ketentuan Pasal 70 huruf c UU No.                     of Article 70 letter c Law No. 30 Year 1999
        30 tahun 1999 tentang Arbitrase dan Alternatif                  concerning Arbitration and Alternative Dispute
        Penyelesaian Sengketa.                                          Resolution.
        Pada tanggal 17 Mei 2023 diadakan sidang                        On May 17, 2023 a trial was held with
        dengan agenda sidang pertama.                                   the agenda for the first session.
        Pada tanggal 21 September 2023 diadakan                         On September 21, 2023, a trial was held with
        sidang dengan agenda pemeriksaan bukti.                         the agenda of examining evidence.
        Pada tanggal 5 Oktober 2023 diadakan sidang                     On October 5, 2023, a trial was held with
        dengan agenda pembacaan putusan dengan                          the agenda of reading the verdict with
        amarnya sebagai berikut :                                       the following ruling:
        1.   Mengabulkan eksepsi para Termohon;                         1.   Accept the Respondents' exception;
        2.   Menyatakan Pengadilan Negeri Medan                         2.   Declare that the Medan District Court has
             tidak berwenang mengadili perkara ini;                          no authority to try this case;
        3.   Menghukum Penggugat untuk membayar                         3.   Punish the Plaintiff to pay the court costs
             biaya perkara yang timbul.                                      incurred.
        Pada tanggal 17 Oktober 2023 Penggugat                          On October 17, 2023, the Plaintiff appealed
        melakukan Banding atas Putusan Perkara a                        the a quo case decision.
        quo.
        Pada tanggal 4 Desember 2023 agenda                             On December 4 2023, the agenda for reading
        pembacaan putusan banding dengan amarnya                        the appeal decision will be as follows:
        sebagai berikut :
        1. Menerima Permohonan Banding dari Kuasa                         1. Receiving the Appeal Application from
           Hukum Pembanding semula Pemohon;                                  the Appellant's original Legal Counsel;
        2. Menguatkan Putusan Pengadilan Negeri atas                      2. Strengthen the District Court's decision on
           Perkara a quo.                                                    the a quo case.
        Pada tanggal 14 Desember 2023 Penggugat                         On December 14, 2023, the Plaintiff carried out
        telah melakukan Upaya Hukum Kasasi atas                         a cassation legal action against the appeal
        Putusan Banding Perkara a quo.                                  decision in the a quo case.
        Sampai dengan tanggal pelaporan Perusahaan                      As of the reporting date, the Company monitors
        memonitor pelaksanaan kasasi.                                   the implementation of cassation.
   8.   Perkara Gugatan Perbuatan Melawan Hukum                    8.   Bocimi Toll Road Project Lawsuit Case for
        Proyek Jalan Tol Bocimi                                         Unlawful Actions
        Yoerizal Tawi mengajukan gugatan ke                             Yoerizal Tawi filed a lawsuit at the Cibadak
        Pengadilan Negeri Cibadak dengan Perkara No.                    District        Court         with       Case
        24/Pdt.G/2023/PN.Cbd dengan Perusahaan                          No.24/Pdt.G/2023/PN.Cbd with the Company as
        sebagai Turut Tergugat IV. Nilai Gugatan                        Co-Defendant IV. The value of the material
        materiil yang diajukan sebesar Rp820.150.200                    awsuit submitted is Rp820,150,200 and
        dan imateriil sebesar Rp2.000.000.000.                          the immaterial value is Rp2,000,000,000.

        Pada tanggal 23 Februari 2024 diadakan sidang                   On February 23 2024 a hearing was held with
        dengan pembacaan Putusan Pengadilan Negeri                      the Cibadak District Court reading the decision
        Cibadak dengan amarnya sebagai berikut:                         with the following ruling:

        Dalam Konvensi                                                  In Convention
        Menolak Eksepsi yang diajukan                                   Reject the proposed exception
        Dalam Pokok Perkara                                             In the Main Case
        1. Mengabulkan gugatan sebagian;                                1. Grant the lawsuit in part;
        2. Menyatakan PENGGUGAT sebagai pemilik                         2. Declare the PLAINTIFF as the legal owner;
           yang sah;
        3. Menyatakan perbuatan TERGUGAT I DAN                          3. Declare the actions of ACCUSED I AND
           TERGUGAT          II      yang       telah                      ACCUSED II who have confessed/claimed to
           mengaku/mengklaim miliki objek sengketa                         own the object of the land dispute in the a
           tanah perkara a quo adalah sebagai                              quo    case      as    an    unlawful   act
           perbuatan         melawan          hukum                        (onrechtmatigedaad)      which    is   very
           (onrechtmatigedaad) yang sangat merugikan                       detrimental to the PLAINTIFF.

                                                         - 202 -
Page 206
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

          PENGGUGAT.
                                                                       Punish the CO-DEFENDANTS to submit and
       Menghukum PARA TURUT TERGUGAT untuk                             comply with the decision;
       tunduk dan patuh pada putusan;

       Pada tanggal 2 Mei 2024 diadakan sidang                         On May 2, 2024 a hearing was held with
       dengan agenda pembacaan Putusan Banding                         the agenda of reading the Appeal Decision with
       dengan amarnya sebagai berikut :                                the following ruling:

       1. Menerima permohonan banding dari Kuasa                       1. Received     the    appeal   request   from
          Pembanding/Penggugat dalam Rekonvensi                           the   Appellant/Plaintiff's   Attorney    in
          semula Tergugat I, tersebut;                                    Defendant I's original Reconvention;
       2. Membatalkan Putusan Pengadilan Negeri                        2. Cancel the Cibadak District Court Decision
          Cibadak Nomor 24/Pdt.G/2023/PN Cbd                              Number 24/Pdt.G/2023/PN Cbd dated 23
          tanggal 23 Februari 2024 tersebut;                              February 2024;

       Dalam Eksepsi :                                                 In Exception:
       Menolak eksepsi Pembanding/Penggugat dalam                      Rejecting the Appellant/Plaintiff's exceptions in
       Rekonvensi semula Tergugat I, dan eksepsi dari                  the original Reconvention of Defendant I, and
       Turut Tergugat II dan Turut Tergugat IV;                        the exceptions of Co-Defendant II and Co-
                                                                       Defendant IV;

       Dalam Pokok Perkara :                                           In the main case:
       Menolak gugatan Terbanding I/Tergugat dalam                     Reject the claim of Respondent I/Defendant in
       Rekonvensi semula Penggugat Konvensi untuk                      the Convention Plaintiff's original Reconvention
       seluruhnya;                                                     in its entirety;

       Dalam Rekonvensi :                                              In Reconvention:
       1. Mengabulkan gugatan rekonvensi dari                           1. Grant the claim for reconvention from
          Pembanding/Penggugat dalam Rekonvensi                            the Appellant/Plaintiff in Defendant I's
          semula Tergugat I untuk sebagian;                                original Reconvention in part;
       2. Menyatakan       perbuatan    Terbanding    I                 2. Declare that the actions of Respondent
          /Tergugat     dalam    Rekonvensi    semula                      I/Defendant in the Plaintiff's original
          Penggugat Konvensi merupakan Perbuatan                           Reconvention to Convention constitute an
          Melawan Hukum;                                                   Unlawful Act;
       3. Menyatakan Pernyataan Perjanjian Jual Beli                    3. Statement of the Sale and Purchase
          atas sebidang tanah di Desa Sundawenang,                         Agreement for a plot of land in Sundaauthor
          Kec         Parungkuda,        Kab.Sukabumi                      Village, Parungkuda District, Sukabumi
          sebagaimana diterangkan di dalam Sertifikat                      Regency as explained in the Certificate of
          Hak Milik No.252 tahun 1992 yang                                 Ownership No. 252 of 1992 which was
          ditandatangani oleh Pembanding/Pengugat                          signed by the Appellant/Plaintiff in the
          dalam Rekonvensi semula Tergugat I dan                           original Reconvention, Defendant I and the
          Terbanding/Tergugat      dalam    Rekonvensi                     Appellant/Defendant      in     the      original
          semula Penggugat Konvensi adalah berlaku                         Reconvention Plaintiff's Convention is valid
          dan Sah secara hukum sebagai bentuk                              and legally valid as a form of buying and
          transaksi jual beli;                                             selling transaction;
       4. Menyatakan Hak Kepemilikan sebidang                           4. Declare that the Ownership Rights of a plot
          tanah    di     Desa   Sundawenang,      Kec                     of land in Sundaauthor Village, Parungkuda
          Parungkuda, Kab.Sukabumi sebagaimana                             District, Sukabumi District as explained in
          diterangkan di dalam Sertifikat Hak Milik                        Certificate of Ownership No. 252 of 1992
          No.252      tahun    1992     adalah    milik                    belong to the Appellant/Plaintiff in the original
          Pembanding/Penggugat dalam Rekonvensi                            Reconvention of Defendant I;
          semula Tergugat I;
       5. Menyatakan Sertifikat Pengganti Nomor 252                    5. Declare that the Replacement Certificate
          Tahun 2017 milik Terbanding I /Tergugat                         Number 252 of 2017 belonging to Appellee
          dalam Rekonvensi semula Penggugat                               I/Defendant in the original Convention
          Konvensi tidak memiliki kekuatan hukum;                         Plaintiff has no legal force;
       6. Menyatakan/      Menetapkan     Pembanding/                  6. Declare/Determine that the Appellant/Plaintiff

                                                          - 203 -
Page 207
PT WASKITA KARYA (PERSERO) Tbk                                                      PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                   NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                          FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                    FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                          ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                  AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                           (Expressed in Rupiah, unless otherwise stated)

            Penggugat dalam Rekonvensi semula                                   in the original Reconvention Defendant I is
            Tergugat I berhak atas seluruh dana ganti                           entitled to all compensation funds for land
            rugi pembebasan tanah yang berlokasi di                             acquisition located in Sundaauthor Village,
            Desa Sundawenang, Kec Parungkuda,                                   Parungkuda District, Sukabumi Regency with
            Kab.Sukabumi dengan Sertifikat Hak Milik                            Certificate of Ownership No. 252 worth
            No.252 senilai Rp. 1.079.145.000 (satu                              Rp1,079,145,000 (one billion seventy-nine
            miliyar tujuh puluh Sembilan juta seratus                           million one hundred and forty-five thousand
            empat puluh lima ribu rupiah) yang telah di                         rupiah) which has been consigned to
            konsinyasi pada Pengadilan Negeri Cibadak;                          the Cibadak District Court;
         7. Menolak      gugatan     rekonvensi    dari                      7. Reject the claim for reconvention from
            Pembanding/Penggugat Rekonvensi semula                              the Appellant/Plaintiff. Defendant I's original
            Tergugat I selebihnya;                                              reconvention claim is the remainder;

         Dalam Konvensi Dan Rekonvensi :                                     In Conventions and Reconventions:

         Menghukum Terbanding I/Tergugat Rekonvensi                          Sentenced       Respondent       I/Reconvention
         semula Penggugat Konvensi untuk membayar                            Defendant to the Convention Plaintiff to pay
         biaya perkara dalam dua tingkat Pengadilan,                         court costs at two levels of Court, which in the
         yang dalam Pengadilan Tingkat Pertama                               Court of First Instance amounted to
         sejumlah Rp2.268.000,-( dua juta dua ratus                          Rp2,268,000 (two million two hundred and sixty
         enam puluh delapan ribu rupiah) dan dalam                           eight thousand rupiah) and at the appeal level
         tingkat banding sejumlah Rp. 150.000,- (seratus                     amounted to Rp150,000,- (one hundred and fifty
         lima puluh ribu rupiah);                                            thousand rupiah);

         Pada tanggal 13 Mei 2024 Penggugat                                  On May 13, 2024, the Plaintiff filed an appeal
         mengajukan Kasasi atas Putusan Banding                              against the appeal decision in the a quo case.
         Perkara a quo.

         Pada tanggal 19 Juni 2024 Penggugat                                 On June 19, 2024, the Plaintiff submitted a
         meyampaikan Kontra Memori Kasasi.                                   Counter-Memorial of Cassation.

         Sampai dengan tanggal pelaporan Perusahaan                          As of the reporting date, the Company is still
         masih memonitor upaya hukum kasasi                                  monitoring further cassation legal efforts.
         selanjutnya.

   9.     Perkara Proyek Pacuan Kuda Takengon                        9.     Takengon Horse Racing Project Case

          Jasruddin Dkk mengajukan gugatan ke                               Jasruddin et al filed a lawsuit at the Takengon
          Pengadilan Negeri Takengon dengan Perkara                         District Court with Case No.8/Pdt.g/2024/PN.Tkn
          No. 8/Pdt.g/2024/PN.Tkn dengan Perusahaan                         with the Company as Co-Defendant III.
          sebagai Turut Tergugat III. Nilai Gugatan                         The value of the material claim submitted is
          materiil     yang     diajukan    sebesar                         Rp1,030,000,000 and the immaterial value is
          Rp1.030.000.000 dan imateriil sebesar                             Rp1,000,000,000.
          Rp1.000.000.000.

          Pada tanggal 26 September 2024 diadakan                           On September 26, 2024, a hearing was held
          sidang dengan agenda Replik dari Penggugat.                       with a Reply from the Plaintif.

          Sampai       dengan tanggal   pelaporan                           As of the reporting date, the Company is still
          Perusahaan masih memonitor upaya sidang                           monitoring further trial efforts.
          selanjutnya.

   10.    Perkara Gugatan Perbuatan Melawan                          10. Brooklyn
                                                                           s       Alam Sutera Apartment Lawsuit
          Hukum Apartemen Brooklyn Alam Sutera                           Case for Unlawful Actions

          Dr. Endira Diah Nurmeirini mengajukan                             Dr. Endira Diah Nurmeirini filed a lawsuit at
          gugatan ke Pengadilan Negeri Tangerang                            the Tangerang District Court with Case
          dengan Perkara No. 568/Pdt.G/2023/PN.Tng                          No. 568/Pdt.G/2023/PN.Tng with the Company
          dengan Perusahaan sebagai Turut Tergugat I.                       as Defendant I. The value of the material awsuit
          Nilai Gugatan materiil yang diajukan sebesar                      submitted     is     Rp2,516,950,245        and

                                                           - 204 -
Page 208
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

         Rp2.516.950.245      dan   imateriil   sebesar                 the immaterial value is Rp5,000,000,000.
         Rp5.000.000.000.

         Pada tanggal 4 April 2024 diadakan sidang                     On April 4, 2024 a hearing was held with
         dengan pembacaan Putusan Pengadilan                           the Tangerang District Court reading the
         Negeri Tangerang dengan amarnya sebagai                       decision with the following ruling:
         berikut:

         Dalam Konvensi                                                In Convention
         Menolak Eksepsi yang diajukan                                 Reject the proposed exception

         Dalam Rekonvensi :                                            In Reconvention:
         1. Menolak gugatan Para Penggugat untuk                       1. Reject the Plaintiff's lawsuit in its entirety
            seluruhnya                                                 2. Sentenced the Petitioner to pay court costs
         2. Menghukum Pemohon untuk membayar                              incurred.
            biaya perkara yang timbul.

         Pada tanggal 24 Juni 2024 diadakan sidang                     On June 24, 2024 a hearing was held with
         dengan agenda pembacaan Putusan Banding                       the agenda of reading the Appeal Decision with
         dengan amarnya sebagai berikut :                              the following ruling:

         1. Menerima permohonan banding dari                           1. Received an appeal request from the original
            Pembanding semula Penggugat;                                  Appellant, Plaintiff;
         2. Membatalkan Putusan Pengadilan Negeri                      2. Cancel the Tangerang District Court
            Cibadak Nomor 568/Pdt.G/2023/PN Tng                           Decision Number 568/Pdt.G/2023/PN Tng
            tanggal 4 April 2024 tersebut;                                dated 4 April, 2024;

         Mengadili Sendiri:                                            Judging:

         1. Menyatakan Pengadilan Negeri Tangerang                     1. Declare that the Tangerang District Court has
            tidak berwenang mengadili perkara ini;                        no authority to try this case;
         2. Menghukum       Pembanding         semula                  2. Sentenced the original Appellee, Plaintiff, to
            Penggugat untuk membayar biaya perkara                        pay court costs at both court levels, which for
            dalam kedua tingkat pengadilan yang                           the appellate court amounted to Rp150,000.
            untuk Pengadilan tingkat banding sebesar
            Rp150.000.

         Pada tanggal 17 Juli 2024 Penggugat telah                     On July 17, 2024, the Plaintiff carried out a
         melakukan Upaya Hukum Kasasi atas                             cassation legal action against the appeal
         Putusan Banding Perkara a quo.                                decision in the a quo case.

         Sampai    dengan     tanggal    pelaporan                     As of the reporting date, the Company monitors
         Perusahaan memonitor pelaksanaan kasasi.                      the implementation of cassation.

   11.   Perkara Perbuatan Melawan              Hukum               11. Indian Embassy Project Lawsuit Case for
         Proyek Kedutaan Besar India                                    Unlawful Actions

         Edwin Soeyadjaya Dkk mengajukan gugatan                       Edwin Soeyadjaya et al filed a lawsuit at
         ke Pengadilan Negeri Jakarta Timur dengan                     the East Jakarta District Court with Case
         Perkara    No.    316/Pdt.G/2024/PN.Jkt.Tim                   No.316/Pdt.G/2024/PN wiith the Company as
         dengan Perusahaan sebagai Turut Tergugat I                    Defendant I with a lawsuit to stop construction.
         dengan         gugatan        menghentikan                    The value of the imaterial claim submitted is
         Pembangunan. Nilai Gugatan imateriil yang                     Rp3,000,000,000,000.
         diajukan sebesar Rp3.000.000.000.000.

         Pada tanggal 25 September 2024 diadakan                       On September 25, 2024, the first trial was held
         sidang pertama dengan agenda Duplik dari                      with a duplicate agenda for the Defendants.
         Para Tergugat.

         Sampai       dengan tanggal   pelaporan                       As of the reporting date, the Company is still
         Perusahaan masih memonitor upaya sidang                       monitoring further trial efforts.
         selanjutnya.


                                                          - 205 -
Page 209
PT WASKITA KARYA (PERSERO) Tbk                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                       (Expressed in Rupiah, unless otherwise stated)

   12.   Perkara Gugatan Melawan Hukum Perkara                    12. Lawsuit Against the Law Claims Death of
         Klaim Kematian Tanam Tumbuh Proyek                           Planting Grow Case Pematang Panggang -
         Pematang Panggang - Kayu Agung                               Kayu Agung Project

         Kartolo dkk mengajukan gugatan ke                              Kartolo dkk filed a lawsuit to Kayu Agung District
         Pengadilan Negeri Kayu Agung dengan                            Court with Case No. 4/Pdt.G/2020/ PN.Kag with
         Perkara No. 4/Pdt.G/ 2020/PN.Kag dengan                        the Company as Defendant I. The value of
         Perusahaan sebagai Tergugat I. Nilai Gugatan                   the     material       claim     amounted       to
         materiil    yang     diajukan        sebesar                   Rp78,913,307,760 and imaterial amounted to
         Rp78.913.307.760 dan imateriil sebesar                         Rp2,000,000,000.
         Rp2.000.000.000.

         Pada tanggal 21 Desember 2020 diadakan                         On December 21, 2020 a session was held with
         sidang dengan agenda pembacaan putusan                         the     agenda        for   the       Readout  of
         dengan amarnya sebagai berikut :                               the Decision with the following guidelines:
         Dalam Eksepsi :                                                In Exception:
     -   Menolak eksepsi dari Tergugat I dan Tergugat             -     Refused the exceptions of Defendant I and
         II untuk seluruhnya                                            Defendant II entirely
         Dalam Pokok Perkara :                                          In the Subject:
     -   Menolak gugatan Para Penggugat untuk                     -     Refusing the Plaintiffs' Complaint Complaints
         seluruhnya.                                                    In Convention and Reconvention:
         Dalam Konvensi dan Dalam Rekonvensi:                           Reject the Plaintiff's lawsuit in its entirety
     -   Menghukum Pemohon untuk membayar biaya                         Sentenced the Petitioner to pay court costs
         perkara yang timbul.                                            incurred.

         Pada tanggal 15 April 2021 agenda                              On April 15 2021, the agenda for reading
         pembacaan putusan banding dengan amarnya                       the appeal decision will be as follows:
         sebagai berikut :
         1. Menerima Permohonan Banding dari                           1.   Receiving the Appeal Application from
             Pembanding semula Penggugat;                                   the Appellant's original;
         2. Menguatkan putusan Putusan Pengadilan                      2.   Strengthen the decision of the Kayu Agung
             Negeri        Kayu     Agung     No.                           District Court, Niomor 4/Pdt.G/2020.PNA
             4/Pdt.G/2020/PNA Kag, tanggal 21                               Kag, dated December 21, 2020;
             Desember 2020 tersebut;                                   3.   Sentenced the original Appellee, Plaintiff, to
         3. Menghukum         Pembanding   semula                           pay court costs
             Penggugat       untuk membayar biaya
             perkara

         Pada tanggal 24 Mei 2022 agenda                                On May 24 2022, the agenda for reading
         pembacaan putusan kasasi dengan amarnya                        the cassation decision will be as follows:
         sebagai berikut :
         1. Menolak permohonan kasasi dari Para                        1.   Reject the cassation      request    from
             Pemohon Kasasi                                                 the cassation applicants
         2. Menghukum Para Pemohon Kasasi untuk                        2.   Sentence the cassation petitioners to pay
             membayar biaya perkara                                         court costs

         Pada tanggal 14 Februari 2023 Penggugat                        On February 14 2023, the plaintiff submitted a
         mengajukan Peninjauan Kembali atas perkara                     judicial review of the a quo case.
         a quo.

         Pada tanggal 4 September 2024 melalui                          On September 4, 2024, via the SIPP page of
         laman SIPP PN Kayu Agung diberitahukan                         the Kayu Agung District Court, the Judicial
         Putusan Peninjauan Kembali atas Perkara a                      Review Decision on the a quo case was notified
         quo dengan amarnya sebagai berikut:                            with the following ruling:
         1. Menolak permohonan peninjauan Kembali                       1. Reject      the    Petitioners' request  for
             dari Para Pemohon;                                             reconsideration;
         2. Menghukum Para Pemohon Peninjauan                           2. Sentencing the Petitioners for Judicial
             Kembali untuk membayar biaya perkara                           Review to pay case fees at all levels of
             dalam semua tingkat peradilan, yang                            justice, which in the Judicial Review
             dalam pemeriksaan Peninjauan Kembali                           examination amounted to IDR 2,500,000.
             sebesar Rp2.500.000.


                                                        - 206 -
Page 210
PT WASKITA KARYA (PERSERO) Tbk                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                    (Expressed in Rupiah, unless otherwise stated)

         Dengan adanya Putusan Peninjauan Kembali                     With the Judicial Review Decision then it is
         maka selanjutnya dianggap telah selesai.                     deemed to have been completed.

   13.   Perkara Gugatan PTUN atas Sanksi Daftar                  13. PTUN Lawsuit Case regarding Black List
         Hitam     pada    Pekerjaan     proyek                       Sanctions on PJU - TS Construction Project
         Pembangunan PJU - TS Wilayah Indonesia                       Work in Indonesian Region 4
         4

         Perseroan mengajukan gugatan Pencabutan                      The Company filed a lawsuit for the Revocation
         Sanksi Daftar Hitam ke Pengadilan Tata                       of Blacklisted Sanctions with the State
         Usaha      Negara     dengan        Perkara                  Administrative Court No. 237/G/2024/PTUN.JKT
         No. 237/G/2024/PTUN.JKT dengan Kuasa                         with the Power of Budget User, Director General
         Pengguna Anggaran Direktur Jenderal Energi                   of New, Renewable Energy and Energy
         Baru Terbarukan dan Konversi Energi sebagai                  Conversion as Defendant.
         Tergugat.

         Pada tanggal 30 September 2024 agenda                        On September 30, 2024, the agenda for reading
         pembacaan putusan penundaan atas KTUN                        the decision to postpone the KTUN will be as
         dengan amarnya sebagai berikut :                             follows:
         1. Mengabulkan permohonan Pemohon                            1. Grant the Petitioner's request regarding
             tentang penundaan pelaksanaan KTUN                       the delay in implementing the KTUN in the form
             berupa        keputusan         Tergugat                 of              Defendant's             decision
             No.72.K/KU.01/KPA/2024               dan                 No.72.K/KU.01/KPA/2024        and    apply    for
             penayangan      sanksi   daftar    hitam                 sanctions to blacklist the Company from the
             Perseroan dari Daftar Hitam Nasional                     National Blacklist on the page www.inaproc.id;
             pada laman www.inaproc.id;                               2. Ordered the Defendant to postpone
         2. Memerintahkan kepada Tergugat untuk                       the implementation of the KTUN which is the
             menunda pelaksanaan KTUN yang                            object of conservation.
             menjadi objek sengketa.

         Pada tanggal 25 September 2024 diadakan                      On September 25, 2024, a trial was held with
         sidang dengan agenda penyampaian bukti                       the agenda of presenting evidence from
         dari Penggugat.                                              the Plaintiff.

         Sampai       dengan tanggal   pelaporan                      As of the reporting date, the Company is still
         Perusahaan masih memonitor upaya sidang                      monitoring further trial efforts.
         selanjutnya.

   14.   Perkara Gugatan Permohonan PKPU CV                       14. CV    Rioli   Metalindo       Perkasa     PKPU
         Rioli Metalindo Perkasa                                      Application Lawsuit Case

         CV Rioli Metalindo Perkasa sebagai pemohon                   CV Rioli Metalindo Perkasa as the applicant filed
         mengajukan       permohonan     Penundaan                    a request for Postponement of Debt Payment
         Kewajiban Pembayaran Utang dengan                            Obligations with Case Number. 208/Pdt.Sus-
         Perkara          Nomor.        208/Pdt.Sus-                  PKPU/2024/PN.Niaga.Jkt.Pst with the Company
         PKPU/2024/PN.Niaga.Jkt.Pst           dengan                  as Respondent. The value of the PKPU
         Perusahaan      sebagai   Termohon.    Nilai                 applicant's application is Rp2,501,626,368 and
         Permohonan Pemohon PKPU sebesar                              other creditors' amount is Rp1,698,694,034.
         Rp2.501.626.368 dan kreditor lain sebesar
         Rp1.698.694.034.

         Pada tanggal 29 Juli 2024 diadakan sidang                    On July 29, 2024, a trial was held with
         dengan agenda pemeriksaan legal standing.                    the agenda of examining legal standing.

         Pada tanggal 26 Agustus 2024 agenda                          On August 26, 2024, the agenda for reading
         pembacaan putusan dengan amarnya sebagai                     the decision will be as follows:
         berikut :
         1. Mengabulkan pencabutan permohonan                        1.   Grant the withdrawal of the request for
             Penundaan    Kewajiban    Pembayaran                         Postponement of Debt Payment Obligations
             Utang (PKPU) yang diajukan oleh Kuasa                        (PKPU) submitted by the PKPU Applicant's
             Pemohon PKPU;                                                Attorney;
         2. Menyatakan sah pencabutan perkara                        2.   Declare the legal withdrawal of the PKPU

                                                        - 207 -
Page 211
PT WASKITA KARYA (PERSERO) Tbk                                                                                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                    (Expressed in Rupiah, unless otherwise stated)

                      permohonan PKPU yang terdaftar di                                                                                      application case registered at the Registrar's
                      Kepaniteraan Pengadilan Niaga;                                                                                         Office of the Commercial Court;
             3.       Memerintahkan     Panitera  Pengadilan                                                                            3.   Order the Registrar of the Commercial Court
                      Niaga pada Pengadilan Negeri Jakata                                                                                    at the Central Jakarta District Court to record
                      Pusat untuk mencatat pencabutan                                                                                        the withdrawal of the PKPU application case
                      Perkara       permohonan         PKPU                                                                                  No. 208/Pdt.SusPKPU/2024lPN. Niaqa. Jkt.
                      No.          208/Pdt.SusPKPU/2024/PN.                                                                                  PSU.
                      Niaga.Jkt.                                                                                                        4.   Charge the PKPU Applicant with a case fee
             4.       Membebankan biaya perkara Penundaan                                                                                    for Postponement of Debt Payment
                      Kewajiban Pembayaran Utang (PKPU)                                                                                      Obligations     (PKPU)        amounting      to
                      kepada     Pemohon     PKPU    sebesar                                                                                 Rp2,940,000,340.
                      Rp2.940.000.340.

             Dengan adanya putusan dari PN Jakarta                                                                                      With the decision from the Central Jakarta
             Pusat maka selanjutnya dianggap telah                                                                                      District Court, the matter is deemed to have
             selesai.                                                                                                                   been completed.

57. SIFAT  DAN                              TRANSAKSI                      PIHAK-PIHAK                                57. NATURE AND TRANSACTIONS WITH RELATED
    BERELASI                                                                                                              PARTIES

   Sifat hubungan berelasi                                                                                                       Nature of Relationship

   a.      Pemerintah      Republik    Indonesia  melalui                                                                        a.      The Government of the Republic of Indonesia
           Kementerian Keuangan adalah pemegang                                                                                          represented by the Ministry of Finance, is
           saham utama Perusahaan.                                                                                                       the Company’s main shareholder.
   b.      Seluruh entitas yang dimiliki dan dikendalikan                                                                        b.      All entities that are owned and controlled by
           oleh Kementerian Keuangan Pemerintah                                                                                          the Ministry of Finance of the Republic of
           Republik Indonesia serta entitas dimana                                                                                       Indonesia including entities where the Ministry
           Kementerian Keuangan Pemerintah Republik                                                                                      of Finance Republic of Indonesia have
           Indonesia memiliki pengaruh signifikan: Badan                                                                                 significant influence: State-owned Enterprise
           Usaha Milik Negara (BUMN).                                                                                                    (SOE).
   c.      Pihak berelasi yang pemegang saham                                                                                    c.      Related parties which main shareholder is
           utamanya sama dengan Grup.                                                                                                    the same with the Group.
   d.      Pihak berelasi yang merupakan Perusahaan                                                                              d.      Related parties which are associates of
           asosiasi dari entitas anak.                                                                                                   the Company’s subsidiaries.
   e.      Manajemen kunci yang meliputi anggota dewan                                                                           e.      Key      management       personnel    includes
           Komisaris dan Direksi Perusahaan.                                                                                             Commissioners and Directors of the Company.

   Transaksi pihak berelasi                                                                                                      Transactions with related parties

   Berikut ini adalah transaksi dengan entitas berelasi:                                                                         The following are transactions with related parties:
     Pihak-pihak Berelasi/ Related Parties                                                   Transaksi                                                                              Transactions
     PT Bank Negara Indonesia (Persero) Tbk         Kas dan Setara Kas, Utang Bank Jangka Panjang, Bank Garansi/LC/SKBDN                       Cash and Cash Equivalent,Long Term Bank Loan, Bank Guarantee/LC/SKBDN
     PT Bank Rakyat Indonesia (Persero) Tbk         Kas dan Setara Kas, Utang Bank Jangka Panjang, Bank Garansi/LC/SKBDN                       Cash and Cash Equivalent, Long Term Bank Loan, Bank Guarantee/LC/SKBDN
     PT Bank Tabungan Negara (Persero) Tbk          Kas dan Setara Kas, Utang Bank Jangka Pendek                                               Cash and Cash Equivalent, Long Term Bank Loan, Short Term Investments, Long Term
                                                                                                                                               Bank Loan
     PT Bank Mandiri (Persero) Tbk                  Kas dan Setara Kas, Investasi Jangka Pendek, Utang Bank Jangka Panjang, Bank               Cash and Cash Equivalent, Short Term Investments, Long Term Bank Loan, Bank
                                                    Garansi/LC/SKBDN                                                                           Guarantee/LC/SKBDN
     PT Bank Syariah Indonesia Tbk (d/h/ formerly   Kas dan Setara Kas, Supply Chain Financing, Utang Bank Jangka Panjang                      Cash and Cash Equivalent, Supply Chain Financing, Long Term Bank Loan,
     PT Bank Syariah Mandiri)
     PT Bank Syariah Indonesia Tbk (d/h/ formerly   Kas dan Setara Kas, Utang Bank Jangka Panjang, Supply Chain Financing                      Cash and Cash Equivalent, Long Term Bank Loan, Supply Chain Financing
     PT Bank BNI Syariah)
     Indonesia Eximbank                             Kas dan Setara Kas, Bank Garansi/LC/SKBDN                                                  Cash and Cash Equivalent, Bank Guarantee/LC/SKBDN
     PT Bank Syariah Indonesia Tbk (d/h/ formerly   Kas dan Setara Kas, Utang Bank Jangka Panjang                                              Cash and Cash Equivalent, Long Term Bank Loan
     PT Bank BRI syariah Tbk)
     PT Bank Tabungan Negara Syariah                Kas dan Setara Kas                                                                         Cash and Cash Equivalent
     PT Bank Mandiri Taspen                         Kas dan Setara Kas                                                                         Cash and Cash Equivalent
     PT Jasamarga Solo Ngawi                        Piutang Lain-lain, Piutang Retensi                                                         Others Receivable, Retention Receivable
     PT Pejagan Pemalang Tol Road                   Piutang Lain-lain, Piutang Retensi                                                         Others Receivable, Retention Receivable
     PT Hutama Karya (Persero)                      Piutang Usaha, Piutang Lain-lain, Piutang Retensi, Tagihan Bruto, Piutang Dagang,          Accounts Receivable, Others Receivable, Retention Receivable, Gross Amount due to from
                                                    Pendapatan                                                                                 Customer, Revenue
     PT Kertas Leces (Persero)                      Piutang Usaha                                                                              Accounts Receivable
     PT Istaka Karya (Persero)                      Piutang Usaha, Piutang Lain-lain                                                           Accounts Receivable, Others Receivable
     PT Perusahaan Listrik Negara (Persero)         Tagihan Bruto, Pendapatan, Piutang Usaha                                                   Gross Amount due to from Customer, Revenue, Accounts Receivable
     KSO/JO Waskita - Arkitek Team Empat            Piutang Ventura Bersama                                                                    Joint Ventures Receivables
     KSO/JO Waskita - Adhi                          Investasi pada Ventura Bersama, Piutang Ventura Bersama                                    Investment in Joint Ventures, Joint Ventures Receivables
     KSO/JO Waskita - Wika                          Investasi pada Ventura Bersama                                                             Investment in Joint Ventures
     Waskita - HK - BRP                             Piutang Ventura Bersama, Investasi pada Ventura Bersama                                    Joint Ventures Receivables, Investment in Joint Ventures
     KSO/JO Hutama - Waskita                        Investasi pada Ventura Bersama                                                             Investment in Joint Ventures




                                                                                                               - 208 -
Page 212
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                      (Expressed in Rupiah, unless otherwise stated)

   Pihak-pihak Berelasi/ Related Parties                                                   Transaksi                                                                                Transactions
   KSO/JO WKR - Asiana Senopati                   Piutang Lain-lain                                                                             Others Receivable
   KSO/ JO WKR - Darmo Permai                     Piutang Lain-lain                                                                             Others Receivable
   KSO/ JO Waskita-Triniti 2                      Piutang Usaha                                                                                 Accounts Receivable
   PT Prima Multi Terminal                        Piutang Lain-lain, Investasi Jangka Panjang Lainnya                                           Others Receivable, Other Long-term Investments
   PT Hutama Marga Waskita                        Tagihan Bruto, Piutang Usaha, Investasi Jangka Panjang Lainnya                                Gross Amount due to from Customer, Accounts Receivable, Other Long-term Investments
   PT Jasamarga Japek Selatan                     Piutang Usaha, Piutang Retensi, Tagihan Bruto, Pendapatan                                     Accounts Receivable, Retention Receivable, Gross Amount due to from Customer, Revenue
   PT Jasamarga Jalan Layang Cikampek             Piutang Retensi                                                                               Retention Receivable
   PT Bukit Asam (Persero) Tbk                    Piutang Retensi, Piutang Usaha, Pendapatan                                                    Retention Receivable, Accounts Receivable, Revenue
   PT Angkasa Pura I (Persero)                    Tagihan Bruto, Pendapatan                                                                     Gross Amount due to from Customer, Revenue
   PT Angkasa Pura II (Persero)                   Tagihan Bruto, Piutang Retensi                                                                Gross Amount due to from Customer, Retention Receivable
   PT Patra Jasa                                  Tagihan Bruto, Piutang Usaha, Pendapatan                                                      Gross Amount due to from Customer,
   KSO/ JO Waskita - HK                           Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   KSO/ JO Waskita - PP                           Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   KSO/ JO Wika - Waskita - Nindya                Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   KSO/ JO Wika - Waskita                         Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   KSO/ JO Waskita - PP - Wika                    Investasi pada Ventura Bersama, Piutang Ventura Bersama                                       Investment in Joint Ventures, Joint Ventures Receivables
   KSO/ JO Waskita - Nindya                       Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   KSO/ JO WKR - RNI                              Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   Waskita - Wika - PP - HK                       Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   Waskita - Amarta                               Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   PT Dok dan Perkapalan Kodja Bahari (Persero)   Piutang Usaha                                                                                 Accounts Receivable
   PT Kresna Kusuma Dyandra Marga                 Piutang Usaha, Piutang Dagang, Tagihan Bruto, Piutang Lain-lain, Piutang Retensi              Accounts Receivable, Trade Receivable, Gross Amount due to from Customer, Others
                                                                                                                                                Receivable, Retention Receivable
   Perum Bulog                                    Tagihan Bruto                                                                                 Gross Amount due to from Customer
   PT Hakaaston                                   Piutang Dagang, Utang Usaha, Tagihan Bruto                                                    Trade Receivable, Accounts Payable, Gross Amount due to from Customer
   PT Pelabuhan Indonesia III                     Piutang Usaha, Uang Muka Kontrak Jangka Panjang, Pendapatan, Tagihan Bruto                    Accounts Receivable, Advances on Long-Term, Revenue, Gross Amount due to from
                                                                                                                                                Customer
   PT Cibitung Tanjung Priok Port Toll Ways       Tagihan Bruto, Pendapatan, Piutang Retensi                                                    Gross Amount due to from Customer, Revenue, Retention Receivable,
   PT Citra Karya Jabar Tol                       Tagihan Bruto, Piutang Usaha                                                                  Gross Amount due to from Customer, Accounts Receivable
   PT Cimanggis Cibitung Tollways                 Piutang Usaha, Piutang Lain-lain, Piutang Retensi, Tagihan Bruto, Pendapatan, Piutang         Accounts Receivable, Others Receivable, Retention Receivable, Gross Amount due to from
                                                  Dagang                                                                                        Customer, Revenue, Trade Receivable
   KSO/ JO Adhi - Minarta                         Pendapatan                                                                                    Revenue
   PT Asuransi Jiwasraya (Persero)                Piutang Lain-lain                                                                             Others Receivable
   KSO/JO Waskita - Vision First                  Piutang Lain-lain                                                                             Others Receivable
   Indonesia Investment Authority (INA)           Piutang Lain-lain                                                                             Others Receivable
   KSO/ JO Waskita - Abipraya                     Investasi pada Ventura Bersama                                                                Investment in Joint Ventures
   KSO/ JO Waskita - Nindya - Permata             Investasi pada Ventura Bersama, Pendapatan                                                    Investment in Joint Ventures, Revenue
   KSO/ JO Waskita - Nindya - LRS                 Investasi pada Ventura Bersama, Piutang Ventura Bersama                                       Investment in Joint Ventures, Joint Ventures Receivables
   PT Trans Jabar Tol                             Piutang Lain-lain, Tagihan Bruto, Pendapatan                                                  Others Receivable, Gross Amount due to from Customer, Revenue
   PT Jasamarga Probolinggo Banyuwangi            Tagihan Bruto, Pendapatan                                                                     Gross Amount due to from Customer, Revenue
   KSO/ JO Waskita - Nindya - Modern              Tagihan Bruto, Pendapatan                                                                     Gross Amount due to from Customer, Revenue
   PT Hutama Karya Infrastruktur                  Pendapatan                                                                                    Revenue



   Rincian item yang terkait dengan transaksi pihak-                                                                                 The details of items associated with the related
   pihak yang berelasi sebagai berikut:                                                                                              parties transaction are as follows:
                                                          30 September/                     31 Desember/                     30 September/                  31 Desember/
                                                        September 30, 2024                December 31, 2023                September 30, 2024             December 31, 2023
                                                               Rp                                Rp                                %                             %
   Aset                                                                                                                                                                                                                 Assets
    Kas dan Setara kas                                      1.223.256.328.717                  1.200.126.034.753                     1,38%                       1,26%                             Cash and Cash Equivalents
    Piutang Usaha                                           3.314.811.453.292                  1.290.292.316.124                     3,74%                       1,35%                                   Accounts Receivable
    Piutang Retensi                                         1.334.114.859.822                  1.213.958.889.589                     1,50%                       1,27%                                   Retention Receivable
    Piutang Lain-lain                                      10.881.279.576.903                  9.819.820.899.990                     12,27%                      10,27%                                     Others Receivable
    Tagihan Bruto                                           3.208.352.863.572                  3.322.024.421.101                     3,62%                       3,48%                      Gross Amount due to from Customer
    Aset Ventura Bersama                                    1.861.637.813.663                    406.721.211.901                     2,10%                       0,43%                                   Joint Ventures Assets



   Persentase di atas                              merupakan                   perbandingan                                          The percentage above is a comparison with the total
   dengan jumlah aset.                                                                                                               of assets.
                                                          30 September/                     31 Desember/                     30 September/                  31 Desember/
                                                        September 30, 2024                December 31, 2023                September 30, 2024             December 31, 2023
                                                               Rp                                Rp                                %                             %
   Liabilitas                                                                                                                                                                                                            Liabilities
    Utang Bank                                              21.232.207.297.483               27.557.563.985.227                      26,35%                       32,81%                                                Bank Loan
    Uang Muka Kontrak                                          183.868.370.096                   19.935.386.402                      0,23%                        0,02%                                        Advance on Contract



   Persentase di atas merupakan                                                perbandingan                                          The percentage above is a comparison with the total
   dengan jumlah liabilitas.                                                                                                         of liabilities.
                                                                 30 September/ September 30,                                          30 September/ September 30,
                                                                 2024                  2023                                           2024                  2023
                                                                  Rp                    Rp                                             %                     %
   Pendapatan Usaha                                         2.077.176.384.871                 1.971.593.551.677                               30,62%                        25,22%                                           Revenue



   Persentase di atas merupakan                                                perbandingan                                          The percentage above is a comparison with the total
   dengan jumlah pendapatan.                                                                                                         of revenue.




                                                                                                                - 209 -
Page 213
PT WASKITA KARYA (PERSERO) Tbk                                                                                                            PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                        AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                         NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                          FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                        AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                 (Expressed in Rupiah, unless otherwise stated)

58. PERJANJIAN                                                                                                          58. AGREEMENTS

   a.   Kontrak Konstruksi                                                                                                    a.       Construction Contract
        Pada tanggal 30 September 2024, berikut                                                                                        As of September 30, 2024 following the details
        perikatan dan perjanjian dalam rangka aktivitas                                                                                of commitments and agreement related to
        konstruksi:                                                                                                                    construction activity:
                                                                                                                                                                                              Jangka Waktu/ Time Period
                                                                                                                            Nilai Kontrak/                   Pemberi Kerja/                     Mulai/         Selesai/           Keterangan/
         No.                             Nama Proyek/ Project Name                       Nomor Kontrak/ Contract Number     Contract Value                      Owner                            Start          Finish             Remark

                                                                                                                                               Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         1       Pembangunan Rumah Susun ASN 3 IKN                                   PS 0102-Rb11.4.2/2023/006               1.019.001.918.918 Perumahan Rakyat/ The Ministry of Public       25-Agu-23          30-Nov-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                               Works and Housing
                                                                                                                                               Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         2       Gedung SEKPRES dan Pendukung - IKN                                  HK.02.01/CB24.5.5/60                    1.217.778.037.861 Perumahan Rakyat/ The Ministry of Public       02-Nov-22          21-Okt-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                               Works and Housing
                                                                                                                                               Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         3       Kantor Kementerian Koordinator 4                                    HK.02.01/Cb24.5.7/88                      662.788.502.703 Perumahan Rakyat/ The Ministry of Public       02-Jan-23          22-Okt-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                               Works and Housing
                                                                                                                                               Kementerian   Pekerjaan   Umum      dan
                                                                                     PL.107/1/1/P4/KONTRAK/BTP-                                                                                                               Belum Jatuh Tempo/
         4       Proyek Jalur KA Lintas Medan-Binjai                                                                           114.323.636.363 Perumahan Rakyat/ The Ministry of Public       14-Apr-22          30-Sep-24
                                                                                     SBU/2022                                                                                                                                 Not Due Yet
                                                                                                                                               Works and Housing
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         5       Proyek Gedung Kedutaan Besar India                                  -                                        334.203.189.000 Embassy of India                                24-Nov-23          20-Feb-26
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         6       Penataan Kws. Benteng Pendem Ambarawa I                             KU.02.09/FISIK/05/FBPB.2023-05/MYC/      127.222.567.567   Perumahan Rakyat/ The Ministry of Public      16-Des-23          16-Sep-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         7       Pacuan Kuda PON XXI Aceh                                            HK.02.03/Cb1.10B/7079                    122.244.144.144   Perumahan Rakyat/ The Ministry of Public      22-Des-23          16-Okt-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         8       Bendungan Jragung Paket 1                                           KU 03.01/Ao.8.2/IX/01/AD-V               733.024.019.131   Perumahan Rakyat/ The Ministry of Public      14-Okt-20          31-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         9       Bendungan Rukoh Paket II                                            HK.02.01-Bws1.8.3/418                    595.368.766.619   Perumahan Rakyat/ The Ministry of Public      31-Des-18          31-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                     HK.02.03/PKK/PPK.BEND.II/2023/01.Ad                                                                                                      Belum Jatuh Tempo/
         10      Proyek Pembangunan Bendungan Bener Paket II                                                                  570.737.916.049   Perumahan Rakyat/ The Ministry of Public      29-Okt-18          31-Des-24
                                                                                     d.XIII                                                                                                                                   Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         11      Bendungan Jlantah (65%)                                             HK.02.03-An/PPKBI/JLT/Add.16/16          570.259.894.918   Perumahan Rakyat/ The Ministry of Public      08-Nov-18          31-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         12      Rentang Irrigation Modernization Project                            HK.02.03-At/3.3/32/Add.XII               553.997.191.671   Perumahan Rakyat/ The Ministry of Public      18-Mei-20          30-Nov-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                     HK.02.03/SNVT/PB.II                                                                                                                      Belum Jatuh Tempo/
         13      Bendungan Mbay JOP 70%                                                                                       441.878.986.421   Perumahan Rakyat/ The Ministry of Public      19-Agu-21          31-Des-24
                                                                                     BWS.NT.II/KB/013/I/2023                                                                                                                  Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         14      Bangunan Pengarah Bendungan Rukoh                                   PB.02.01-Bws1.8.2/896                    415.192.000.000   Perumahan Rakyat/ The Ministry of Public      09-Sep-21          31-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan                                       Addendum      Dalam
         15      Pengendalian Banjir Sungai Loji-Banger I                            10/ADD/KU.03.01/Ao.7.2/KNT/07/2021       251.318.181.381   Perumahan Rakyat/ The Ministry of Public      04-Okt-21          25-Agu-24    Proses/ Addendum in
                                                                                                                                                Works and Housing                                                             Process
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         16      Lanjutan Pembangunan Bend Temef JOP 65%                             SPMK tgl 23 Agustus 2022                 274.156.101.845   Perumahan Rakyat/ The Ministry of Public      19-Agu-22          31-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         17      RENTANG IRRIGATION LOS 01 JOP 60%                                   HK.02.02-At/3.3/07                       161.951.953.513   Perumahan Rakyat/ The Ministry of Public      11-Nov-22          10-Nov-25
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                Kementerian   Pekerjaan   Umum      dan
                                                                                     HK.02.03-AS/KONT-                                                                                                                        Belum Jatuh Tempo/
         18      PROYEK PENGENDALI BANJIR BIMA - PAKET 4A                                                                     112.628.669.182   Perumahan Rakyat/ The Ministry of Public      25-Mei-23          15-Nov-24
                                                                                     SK.SUPAII/113/2023                                                                                                                       Not Due Yet
                                                                                                                                                Works and Housing
                                                                                                                                                                                                                              Addendum      Dalam
                                                                                     20/ADD/KONTRAK-
         19      JEMBATAN MUSI                                                                                                832.056.167.390 PT. Waskita Sriwijaya Tol                       13-Agu-21          31-Agu-24    Proses/ Addendum in
                                                                                     JEMBATAN.S2/WK/2023
                                                                                                                                                                                                                              Process
                                                                                                                                              Kementerian   Pekerjaan   Umum      dan
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         20      Pengarah Bendungan Rukoh                                            PB.02.01-Bws1.8.2/896                    415.192.000.000 Perumahan Rakyat/ The Ministry of Public        06-Sep-21          31-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                              Works and Housing
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         21      Probolinggo - Banyuwangi Paket 3 JOP 25%                            021/KONTRSK/2023                         996.821.538.317 Jasamarga Probolinggo Banyuwangi                12-Jun-23          12-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                                                                                              Addendum      Dalam
         22      Akses Jalan Tol Japek Selatan (Deltamas)                            046/KONTRAK-DIR.JJS/2023                 100.900.000.000 PT Puradelta Lestari                            26-Jun-23          30-Jun-24    Proses/ Addendum in
                                                                                                                                                                                                                              Process
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         23      Jalan Tol Ciawi Sukabumi Seksi 3                                    036/PERJ/TJT/X/2023                     1.690.759.891.312 PT Trans Jabar Tol                             27-Nov-23          26-Nov-25
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                                                                                              Addendum      Dalam
                                                                                                                                                PUPR Cipta Karya          Balai   Prasarana
         24      Jambi Sewer Sistem B2                                               CK0602/CPMUMSMIP/01/2024                 236.192.955.000                                                 09-Okt-20          31-Mei-24    Proses/ Addendum in
                                                                                                                                                Permukiman Wilaya
                                                                                                                                                                                                                              Process
                                                                                                                                              Kementerian   Pekerjaan   Umum      dan
                                                                                     HK.02.03/ADD.5-                                                                                                                          Belum Jatuh Tempo/
         25      PEMBANGUNAN HUNTAP PASCA BENCANA SULTENG                                                                      88.742.982.917 Perumahan Rakyat/ The Ministry of Public        28-Des-22          30-Sep-24
                                                                                     2D/PPK.HUNTAP/PP.SUL                                                                                                                     Not Due Yet
                                                                                                                                              Works and Housing
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         26      RANCANG DAN BANGUN KLHK 2022                                        032/AMD-PJ.V.SP/IV/2024                  178.378.378.378 PT. Patra Jasa                                  21-Des-22          31-Des-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         27      Road from Tono-Noefefan Bridge to Oenuno                            45/2022/PA/REAOA-ZEESM                   322.891.938.812 ZEESM TL                                        19-Agu-22          30-Sep-24
                                                                                                                                                                                                                              Not Due Yet
                                                                                                                                                                                                                              Belum Jatuh Tempo/
         28      Tono Market Oesilo Border Road                                      59/2023/PA/REAOA-ZEESM                   513.253.663.000 ZEESM TL                                        16-Mei-23          04-Mei-25
                                                                                                                                                                                                                              Not Due Yet




   b.   Kontrak Konsesi Pengusahaan Jalan Tol                                                                                 b.       Concession Toll Road Right Contract

                                  Perusahaan/                        Ruas Tol/                            Mitra Kerja/                                   Isi Perjanjian/                                   Jangka Waktu/ Period
         No
                                 The Company                         Toll Section                            Partners                            Content of the Agreement                           Mulai/ Start             Selesai/ Finish


             1      PT Pemalang Batang Toll Road                Pemalang - Batang         Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 50                         2017                    2067
                    (PBTR)                                                                Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 50
                                                                                          Public Works and Housing                    years
             2      PT Waskita Sriwijaya Tol (WST)              Kayu Agung -              Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 50                         2017                    2067
                                                                Palembang - Betung        Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 50
                                                                                          Public Works and Housing                    years
             3      PT Waskita Bumi Wira (WBW)                  Krian - Legundi -         Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 50                         2016                    2066
                                                                Bunder - Manyar           Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 50
                                                                                          Public Works and Housing                    years
             4      PT Tol Transjawa Paspro Jalan Tol Pasuruan -                          Kementerian Pekerjaan Umum dan              Hak konsesi pengusahaan jalan tol selama 50                         2011                    2061
                    (TJPJT)                           Probolinggo                         Perumahan Rakyat/ The Ministry of           tahun/ Toll road concession rights for 50
                                                                                          Public Works and Housing                    years



                                                                                                                  - 210 -
Page 214
PT WASKITA KARYA (PERSERO) Tbk                                                               PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                           AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                            NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                   FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                             FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                   ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                           AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                    (Expressed in Rupiah, unless otherwise stated)

59. MANAJEMEN RISIKO KEUANGAN                                               59. FINANCIAL RISK MANAGEMENT

   Dalam     pengelolaan keuangan,      Grup telah                                In financial management, the Group has identified,
   melakukan identifikasi, mengukur, mengawasi dan                                measured, monitored and managed basic risks in an
   mengelola risiko dasar dalam upaya melindungi                                  effort to protect long-term business continuity and
   kesinambungan bisnis dalam jangka panjang dan                                  minimize unexpected impacts on the Group's
   meminimalkan dampak yang tidak diharapkan pada                                 consolidated financial performance.
   kinerja keuangan konsolidasian Grup.

   Grup menggunakan berbagai metode dalam                                         Groups use various methods in conducting risk
   melakukan analisa risiko terhadap persaingan dan                               analysis of competition and uncertainty which can
   ketidakpastian   yang       dapat    berpengaruh                               affect finances and liabilities financial as follows:
   padakeuangan dan liabilitas keuangan sebagai
   berikut:

   a.   Klasifikasi Aset dan Liabilitas Keuangan                                  a.      Classifications of Financial Assets and Liabilities

        Berikut adalah nilai tercatat pada 30 September                                   The carrying value at September 30, 2024 and
        2024 dan 31 Desember 2023:                                                        December 31, 2023:
                                                             30 September/          31 Desember/
                                                           September 30, 2024     December 31, 2023
                                                                  Rp                     Rp
        Aset Keuangan - pada                                                                                                              Financial Assets - at
          Biaya Perolehan diamortisasi                                                                                                      Amortiozed Cost
          Kas dan Setara Kas                                  1.369.466.405.905        1.340.065.112.240                         Cash and Equivalents Cash
          Kas yang Dibatasi Penggunaannya                     3.182.399.375.477        6.698.167.060.090                                     Restricted Cash
          Investasi Jangka Pendek                                 8.448.200.000            8.448.200.000                              Short-Term Investments
          Piutang Usaha                                       3.812.218.131.586        1.920.355.977.799                                 Accounts Receivable
          Piutang Retensi                                     1.461.344.889.645        1.490.267.616.686                                Retention Receivable
          Piutang Lain-lain                                  11.186.631.138.889        9.872.580.331.665                                   Other Receivables
          Piutang Ventura Bersama                               373.688.317.297          360.741.426.135                          Joint Ventures Receivables
          Tagihan Bruto kepada Pengguna Jasa                  4.437.324.332.330        4.496.709.067.451                 Gross Amount Due from Customers
          Aset Keuangan atas Proyek Konsesi                     220.294.883.927          244.153.323.372            Financial Assets from Concession Project
        Aset Keuangan yang Dimiliki untuk diperdagangkan                                                                        For Trading Financial Assets
          Investasi Jangka Panjang Lainnya                      869.738.189.820         869.738.189.820                        Other Long-Term Investments
        Jumlah                                               26.921.553.864.876     27.301.226.305.258                                                     Total

        Liabiltas Keuangan - pada                                                                                                      Financial Liabilities - at
          Biaya perolehan diamortisasi                                                                                                        Amortized cost
          Utang Usaha                                         4.733.751.620.458      5.839.016.918.891                                    Accounts Payables
          Utang Bruto Subkontraktor                           1.537.128.842.288      1.687.713.369.915                   Gross Amount Due to Third Parties
          Utang Bank                                         46.444.210.087.250     47.839.189.027.957                                              Bank Loan
          Utang Lembaga Keuangan Non-Bank                     6.204.049.277.890      5.716.570.341.368                Loan to Financial Institution Non-Bank
          Biaya yang Masih Harus Dibayar                      3.904.842.093.877      3.326.419.315.615                                    Accrued Expenses
          Utang Ventura Bersama                               1.642.144.840.411      1.332.247.776.159                                Joint Venture Payable
          Utang Obligasi                                      8.844.640.463.179      8.828.624.933.131                                         Bonds Payable
          Surat Utang Jangka Menengah                           777.945.758.287        735.727.511.026                                  Medium Term Notes
          Utang Lain-lain - Jangka Panjang                      305.695.207.801        310.522.632.588                          Other Payables - Long Term
        Jumlah                                               74.394.408.191.441     75.616.031.826.650                                                     Total



   b.   Tujuan dan Kebijakan Manajemen Risiko                                     b.      Financial Risk Management Objectives and
        Keuangan                                                                          Policies

        Bisnis Grup mencakup aktivitas pengambilan                                        The Group's business includes risk-taking
        risiko dengan sasaran tertentu dengan                                             activities  with   specific   objectives   with
        pengelolaan yang profesional. Fungsi utama                                        professional management. The main function of
        dari manajemen risiko Grup adalah untuk                                           the Group's risk management is to identify all
        mengidentifikasi seluruh risiko kunci, mengukur                                   key risks, measure these risks and manage risk
        risiko-risiko ini dan mengelola posisi risiko. Grup                               positions. The Group regularly reviews policies
        secara rutin menelaah kebijakan dan sistem                                        and risk management system to adjust to
        manajemen risiko untuk menyesuaikan dengan                                        changes in markets, products and best market
        perubahan di pasar, produk dan praktek pasar                                      practices.
        terbaik.

        Grup mendefinisikan risiko keuangan sebagai                                       The Group defines financial risk as
        kemungkinan kerugian atau laba yang hilang,                                       the possibility of loss or lost profit, caused by
        yang disebabkan oleh faktor internal maupun                                       both internal and external factors that potentially

                                                                       - 211 -
Page 215
PT WASKITA KARYA (PERSERO) Tbk                                                        PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                     NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                            FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                      FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                            ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                    AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                             (Expressed in Rupiah, unless otherwise stated)

       faktor eksternal yang berpotensi           negatif                        have a negative impact on the achievement of
       terhadap pencapaian tujuan Grup.                                          Group goals.
       Tujuan Grup dalam mengelola risiko keuangan                               The purpose of the Group in managing financial
       adalah untuk mencapai keseimbangan yang                                   risks is to achieve an appropriate balance
       sesuai antara risiko dan tingkat pengembalian                             between risk and returns and minimize potential
       serta     meminimalisasi      potensi   efek                              adverse effects of the Group's financial
       memburuknya kinerja keuangan Grup.                                        performance.

       Risiko keuangan utama yang dihadapi Grup                                  The main financial risks facing the Group are
       adalah risiko kredit, risiko suku bunga, risiko                           credit risk, interest rate risk, liquidity risk, foreign
       likuiditas, risiko nilai tukar mata uang asing dan                        currency exchange rates and the risk of
       risiko perubahan kebijakan pemerintah, kondisi                            changes in government policy, socio-economic
       ekonomi dan sosial politik. Perhatian atas                                and political conditions. Attention to risk
       pengelolaan risiko ini telah meningkat secara                             management has increased significantly and
       signifikan dengan mempertimbangan perubahan                               considered changer and volatility of financial
       dan volatilitas pasar keuangan di Indonesia dan                           markets in Indonesia and internationally.
       internasional.

        i. Risiko Kredit                                                           i. Credit Risk
           Risiko kredit adalah kerugian yang timbul                                    Credit risk is the loss arising from
           dari pelanggan yang gagal memenuhi                                           customers who fail to meet their contractual
           kewajiban kontraktual mereka.                                                obligations.

           Instrumen keuangan Grup yang mempunyai                                       The Group's financial instruments that have
           potensi atas risiko kredit terdiri dari kas dan                              the potential for credit risk consist of cash
           setara kas, piutang usaha, piutang retensi,                                  and cash equivalents, accounts receivable,
           tagihan bruto dan piutang lain-lain. Jumlah                                  retention, gross amount due from
           eksposur risiko kredit maksimum sama                                         customers and other receivables. Total
           dengan nilai tercatat atas akun-akun                                         maximum credit risk exposure equal to the
           tersebut. Rincian umur piutang usaha dapat                                   carrying value of these accounts. The aging
           dilihat pada Catatan dalam laporan                                           of trade receivables can be seen on notes
           keuangan konsolidasian. Pada tanggal 30                                      to consolidated financial statements. On
           September 2024 dan 31 Desember 2023                                          September 30, 2024 and December 31,
           piutang usaha Grup tidak terkonsentrasi                                      2023 accounts receivable of the Group is
           pada pelanggan tertentu.                                                     not concentrated on a particular customer.

           Grup mengelola risiko kredit dengan                                          The Group manages credit risk by setting
           menetapkan batasan jumlah risiko yang                                        limits of acceptable risk for each customer.
           dapat diterima untuk masing-masing
           pelanggan.
        ii. Risiko Suku Bunga                                                     ii. Interest Rate Risk
           Risiko tingkat bunga arus kas adalah risiko                                  Cash flow interest rate risk is the risk that
           dimana arus kas masa depan dari suatu                                        future cash flows of a financial instrument
           instrumen keuangan berfluktuasi karena                                       fluctuate due to changes in market interest
           perubahan suku bunga pasar. Grup                                             rates. The Group has loans with floating
           memiliki     pinjaman    dengan     bunga                                    interest. The interest rate that are quite high
           mengambang. Tingkat suku bunga yang                                          and     occurs     suddenly       can     effect
           cukup tinggi dan terjadi secara tiba-tiba                                    the decline in the Group’s income.
           dapat berpengaruh terhadap menurunnya
           laba Grup.
           Berikut ini merupakan rincian dari liabilitas                                The following is a breakdown of financial
           keuangan berdasarkan jenis tingkat suku                                      liabilities based on the type of interest rate:
           bunga:
                                                       30 September/          31 Desember/
                                                     September 30, 2024     December 31, 2023
                                                            Rp                     Rp
           Liabilitas Keuangan                                                                                              Financial Liabilities
             Suku bunga mengambang                      4.628.522.570.724      4.624.166.434.872                         Floating Interest Rate




                                                               - 212 -
Page 216
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                                  PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                              AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                               NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                                      FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                                                FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                                      ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                                              AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                                       (Expressed in Rupiah, unless otherwise stated)


           Analisis sensitivitas suku bunga                                                                                                                             Interest rate sensitivity analysis

           Analisis sensitivitas di bawah ini telah                                                                                                                     The sensitivity analysis below have been
           ditentukan berdasarkan eksposur suku                                                                                                                         determined based on the exposure to
           bunga untuk kedua instrumen derivatif dan                                                                                                                    interest rates for both derivatives and non-
           non-derivatif pada akhir periode pelaporan.                                                                                                                  derivative instruments at the end of the
           Untuk liabilitas tingkat bunga mengambang,                                                                                                                   reporting period. For floating rate liabilities,
           analisis tersebut disusun dengan asumsi                                                                                                                      the analysis is prepared assuming the
           jumlah liabilitas terutang pada akhir periode                                                                                                                amount of the payable liability at the end of
           pelaporan itu terutang sepanjang tahun.                                                                                                                      the reporting period will remain for the
           Kenaikan atau penurunan 0,5 basis poin                                                                                                                       whole year. A 0.5 basis points increase or
           digunakan ketika melaporkan risiko suku                                                                                                                      decrease is used when reporting interest
           bunga secara internal kepada karyawan                                                                                                                        rate risk internally to key management
           kunci dan merupakan penilaian manajemen                                                                                                                      personnel and represents management's
           terhadap perubahan yang mungkin terjadi                                                                                                                      assessment of the reasonably possible
           pada suku bunga.                                                                                                                                             change in interest rates.

           Jika suku bunga lebih tinggi/rendah 50                                                                                                                       If interest rates had been 50 basis points
           basis poin dan semua variable lainnya tetap                                                                                                                  higher/ lower and all other variables
           konstan, laba pada tanggal 30 September                                                                                                                      were held constant, profit as of September
           2024 dan 31 Desember 2023 akan                                                                                                                               30, 2024 and December 31, 2023 would
           turun/naik     masing-masing       sebesar                                                                                                                   decrease/ increase by Rp320,932,686,627
           Rp320.932.686.627                       dan                                                                                                                  and Rp321,669,999,832 respectively. This
           Rp321.669.999.832. Hal ini terutama                                                                                                                          is mainly attributable to the Group’s
           disebabkan oleh eksposur Grup terhadap                                                                                                                       exposure to interest rates on its floating rate
           suku bunga atas pinjamannya dengan suku                                                                                                                      borrowings.
           bunga mengambang.

       iii. Risiko Likuiditas                                                                                                                               iii. Liquidity Risk

           Risiko likuiditas adalah risiko di mana posisi                                                                                                               Liquidity risk is the risk in which the
           arus kas menunjukkan pendapatan jangka                                                                                                                       positions of cash flows show short-term
           pendek tidak cukup untuk menutupi                                                                                                                            revenues are not sufficient to cover short-
           pengeluaran jangka pendek.                                                                                                                                   term expenses.

           Eksposur risiko likuiditas berupa kesulitan                                                                                                                  Liquidity risk is an exposure of the Group
           Grup dalam memenuhi kewajiban keuangan                                                                                                                       difficulties in meeting financial obligations
           yang harus dibayar dengan kas atau aset                                                                                                                      that must be paid with cash or other
           keuangan lainnya. Grup diharapkan dapat                                                                                                                      financial assets. The Group is expected to
           membayar seluruh kewajibannya sesuai                                                                                                                         pay all its obligations in accordance with
           dengan jatuh tempo kontraktual. Dalam                                                                                                                        contractual maturities. In fulfilling this
           memenuhi liabilitas tersebut, maka Grup                                                                                                                      obligation,
           harus menghasilkan arus kas masuk yang                                                                                                                       the Group must generate sufficient cash
           cukup.                                                                                                                                                       inflows.

           Berikut ini merupakan liabilitas keuangan                                                                                                                    These are non-derivative financial liabilities
           non-derivatif berdasarkan nilai sisa jatuh                                                                                                                   based on residual maturity value which was
           tempo yang tidak didiskonto:                                                                                                                                 not discounted:
                                                                                                                               30 September/ September 30, 2024
                                                   Tingkat bunga rata-rata
                                                      tertimbang efektif/            < 1 Tahun/          >1-2 Tahun/               >2-3 Tahun/            >3 Tahun/             Jumlah/             Biaya Emisi/         Nilai Tercatat/
                                                      Weighted average                < 1 Year           >1-2 Years                >2-3 Years             >3 Years               Total            Issuance Costs        Carrying Amount
                                                    effective interest rate              Rp                  Rp                         Rp                   Rp                   Rp                    Rp                     Rp

             Tanpa Bunga                                                                                                                                                                                                                                          Non-interest bearing
                Utang Usaha                                                   --    2.712.953.917.628     1.737.886.024.434        282.911.678.396                      --    4.733.751.620.458                    --    4.733.751.620.458                        Accounts Payable
                Utang Bruto Subkontraktor                                     --    1.063.701.922.477       473.426.919.811                      --                     --    1.537.128.842.288                    --    1.537.128.842.288    Gross Amount Due to Subcontractors
                Biaya yang Masih Harus Dibayar                                --    3.904.842.093.877                     --                     --                     --    3.904.842.093.877                    --    3.904.842.093.877                       Accrued Expenses
                Liabilitas Sewa Guna Usaha                                    --        1.979.510.649        11.941.638.206                      --                     --       13.921.148.855                    --       13.921.148.855                           Lease Liabilities
                Utang Ventura Bersama                                         --                    --    1.642.144.840.411                      --                     --    1.642.144.840.411                    --    1.642.144.840.411                   Joint Venture Payable
                Utang Lain-lain Jangka Panjang                                --                    --      305.695.207.801                      --                     --      305.695.207.801                    --      305.695.207.801              Other Long-Term Payables
             Instrumen tingkat bunga variabel                                                                                                                                                                                                         Variable interest rate instrument
                Utang Lembaga Keuangan Non Bank                         10,50                       --    6.204.049.277.890                      --                     --    6.204.049.277.890                    --    6.204.049.277.890   Loan to Financial Institution Non Bank
             Instrumen suku bunga tetap                                                                                                                                                                                                                 Fixed interest rate instruments
                Utang Bank Jangka Pendek                                0 - 11        700.127.052.202                     --                     --                     --      700.127.052.202                   --       700.127.052.202                  Short-Term Bank Loans
                Utang Bank Jangka Panjang                         5,40 - 5,50       6.085.227.898.133    19.862.735.887.146                      --    19.796.119.249.769    45.744.083.035.048                   --    45.744.083.035.048                  Long-Term Bank Loans
                Surat Utang Jangka Menengah                                 10        250.000.000.000       527.945.758.287                      --                     --      777.945.758.287                   --       777.945.758.287                     Medium Term Notes
                Utang Obligasi                                   6,10 - 11,10       1.361.750.000.000     3.596.832.237.771                      --     3.900.300.000.000     8.858.882.237.771     (14.241.774.592)     8.844.640.463.179                            Bonds Payable
                Sukuk Mudharabah                                 6,10 - 11,10                       --                    --                     --     1.148.100.000.000     1.148.100.000.000      (2.650.771.454)     1.145.449.228.546                      Sukuk Mudharabah
                Liabilitas Jangka Pendek Lainnya                             --       800.138.622.766                     --                     --                     --      800.138.622.766                   --       800.138.622.766              Other Short-Term Liabilities
               Jumlah Liabilitas Keuangan                                          16.880.721.017.732    34.362.657.791.757        282.911.678.396     24.844.519.249.769    76.370.809.737.654     (16.892.546.046)    76.353.917.191.608               Total Financial Liabilities




                                                                                                                          - 213 -
Page 217
PT WASKITA KARYA (PERSERO) Tbk                                                                                                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                                                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                                                                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                                                                   (Expressed in Rupiah, unless otherwise stated)

                                                                                                                             31 Desember/ December 31, 2023
                                                   Tingkat bunga rata-rata
                                                      tertimbang efektif/          < 1 Tahun/          >1-2 Tahun/             >2-3 Tahun/            >3 Tahun/             Jumlah/             Biaya Emisi/         Nilai Tercatat/
                                                      Weighted average              < 1 Year           >1-2 Years              >2-3 Years             >3 Years               Total            Issuance Costs        Carrying Amount
                                                    effective interest rate            Rp                  Rp                       Rp                   Rp                   Rp                    Rp                     Rp
             Tanpa Bunga                                                                                                                                                                                                                                         Non-interest bearing
                Utang Usaha                                                 --    4.038.853.751.009     1.548.140.324.379      252.022.843.503                      --    5.839.016.918.891                    --    5.839.016.918.891                           Accounts Payable
                Utang Bruto Subkontraktor                                   --    1.238.493.253.050       449.220.116.865                    --                     --    1.687.713.369.915                    --    1.687.713.369.915       Gross Amount Due to Subcontractors
                Biaya yang Masih Harus Dibayar                              --    3.326.419.315.615                     --                   --                     --    3.326.419.315.615                    --    3.326.419.315.615                          Accrued Expenses
                Liabilitas Sewa Guna Usaha                                  --        7.157.455.725        20.781.049.872                    --                     --       27.938.505.597                    --       27.938.505.597                              Lease Liabilities
                Utang Ventura Bersama                                       --                    --    1.332.247.776.159                    --                     --    1.332.247.776.159                    --    1.332.247.776.159                      Joint Venture Payable
                Utang Lain-lain Jangka Panjang                              --                    --      310.522.632.588                    --                     --      310.522.632.588                    --      310.522.632.588                 Other Long-Term Payables
             Instrumen tingkat bunga variabel                                                                                                                                                                                                        Variable interest rate instrument
                Utang Lembaga Keuangan Non Bank                        10,50        68.707.045.428      5.716.570.341.368                    --                     --    5.785.277.386.796                    --    5.785.277.386.796      Loan to Financial Institution Non Bank
             Instrumen suku bunga tetap                                                                                                                                                                                                                Fixed interest rate instruments
                Utang Bank Jangka Pendek                               0 - 11       700.127.052.202                     --                   --                     --      700.127.052.202                   --       700.127.052.202                     Short-Term Bank Loans
                Utang Bank Jangka Panjang                        5,40 - 5,50      1.095.725.133.129    26.205.550.508.249                    --    19.837.786.334.377    47.139.061.975.755                   --    47.139.061.975.755                     Long-Term Bank Loans
                Surat Utang Jangka Menengah                                10       250.000.000.000       485.727.511.026                    --                     --      735.727.511.026                   --       735.727.511.026                        Medium Term Notes
                Utang Obligasi                                  6,10 - 11,10      4.715.500.000.000       228.966.761.482                    --     3.900.300.000.000     8.844.766.761.482     (16.141.828.351)     8.828.624.933.131                               Bonds Payable
                Sukuk Mudharabah                                6,10 - 11,10                      --                    --                   --     1.148.100.000.000     1.148.100.000.000      (2.918.892.530)     1.145.181.107.470                         Sukuk Mudharabah
                Liabilitas Jangka Pendek Lainnya                            --    2.229.199.098.279                     --                   --                     --    2.229.199.098.279                   --     2.229.199.098.279                 Other Short-Term Liabilities
               Jumlah Liabilitas Keuangan                                        17.670.182.104.437    36.297.727.021.987      252.022.843.503     24.886.186.334.377    79.106.118.304.305     (19.060.720.881)    79.087.057.583.424                  Total Financial Liabilities



            Grup mengelola risiko likuiditas dengan                                                                                                                 The Group manages liquidity risk by
            mempertahankan kas dan setara kas yang                                                                                                                  maintaining cash and cash equivalents
            mencukupi dalam memenuhi komitmen                                                                                                                       sufficient to meet the commitments of
            Grup untuk operasi normal dan secara rutin                                                                                                              the Group for normal operation and
            mengevaluasi proyeksi arus kas dan arus                                                                                                                 regularly evaluates cash flow projections
            kas aktual, serta jadwal tanggal jatuh tempo                                                                                                            and actual cash flows, and the schedule
            aset dan liabilitas keuangan.                                                                                                                           date of maturity of assets and financial
                                                                                                                                                                    liabilities.

        iv. Risiko Nilai Tukar Mata Uang Asing                                                                                                          iv. Foreign                              Exchange                                Risk             Foreign
                                                                                                                                                            Currency
            Eksposur risiko nilai tukar mata uang asing                                                                                                             Risk exposure of foreign currency exchange
            merupakan bagian dari kegiatan operasi                                                                                                                  rate is part of normal operations of
            normal Perusahaan dan cabang Luar                                                                                                                       the Company and the Foreign branches.
            Negeri.
            Pengaruh dari selisih nilai tukar mata uang                                                                                                             The effect of foreign exchange currency
            asing tidak signifikan.                                                                                                                                 differences is not significant.
        v. Risiko Perubahan Kebijakan Pemerintah,                                                                                                        v. Risk of Changes in Government Policy,
           Kondisi Ekonomi dan Sosial Politik                                                                                                               Economic and Social Politics
            Kebijakan     Pemerintah    baik    yang                                                                                                                Government policies concerning economic
            menyangkut ekonomi dan moneter, serta                                                                                                                   and monetary, and social and political
            kondisi sosial dan politik yang kurang                                                                                                                  conditions that are less conducive will result
            kondusif akan berakibat menurunnya                                                                                                                      in the decreasing of investment and
            investasi dan pembangunan. Hal ini dapat                                                                                                                development. This can lead to delays in
            mengakibatkan tertundanya proyek-proyek                                                                                                                 projects that have been or will be acquired
            yang telah maupun akan diperoleh Grup.                                                                                                                  by the Group.
            Risiko ini merupakan risiko yang bersifat                                                                                                               This risk is a systemic risk whereby if this
            sistemik dimana bila risiko ini terjadi maka                                                                                                            happens then the risk will negatively affect
            akan mempengaruhi secara negatif seluruh                                                                                                                all the variables involved, this make
            variabel yang terlibat, sehingga membuat                                                                                                                the performance of the Group decrease.
            kinerja Grup menurun. Diversifikasi risiko ini                                                                                                          Even risk diversification is not able to
            pun belum mampu menghilangkan risiko ini.                                                                                                               eliminate this risk.
   c.   Manajemen Risiko Modal                                                                                                                c.         Capital Risk Management Policy
        Tujuan dari Grup dalam mengelola permodalan                                                                                                      The purpose of the Group in managing capital is
        adalah untuk melindungi kemampuan Grup                                                                                                           to protect the ability of the Group in maintaining
        dalam mempertahankan kelangsungan usaha,                                                                                                         business continuity, so the Group can still
        sehingga Grup dapat tetap memberikan hasil                                                                                                       deliver results for shareholders and benefits for
        bagi pemegang saham dan manfaat bagi                                                                                                             other stakeholders, and to provide adequate
        pemangku kepentingan lainnya, dan untuk                                                                                                          returns to shareholders by pricing products and
        memberikan imbal hasil yang memadai kepada                                                                                                       services that are commensurate with the level of
        pemegang saham dengan menentukan harga                                                                                                           risk.
        produk dan jasa yang sepadan dengan tingkat
        risiko.
                                                                                                                        - 214 -
Page 218
PT WASKITA KARYA (PERSERO) Tbk                                                     PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                  NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                         FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                   FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                         ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                 AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                          (Expressed in Rupiah, unless otherwise stated)


        Grup menetapkan sejumlah modal sesuai                                 The Group set a number of capital in proportion
        proporsi terhadap risiko. Grup mengelola                              to the risk. The Group manages its capital
        struktur modal dan membuat penyesuaian                                structure and makes adjustments taking into
        dengan memperhatikan perubahan kondisi                                account changes in economic conditions and
        ekonomi dan karakteristik risiko aset yang                            risk characteristics of the underlying asset.
        mendasari.
        Konsisten dengan Perusahaan lain dalam                                Consistent with other companies in the industry,
        industri, Grup memonitor modal dengan dasar                           the Group monitors capital on the basis of
        rasio utang terhadap modal yang disesuaikan.                          the debt ratio of to adjusted capital. This ratio is
        Rasio ini dihitung sebagai berikut: utang neto                        calculated as follows: net debt divided by
        dibagi modal yang disesuaikan. Utang neto                             adjusted capital. Net debt is total liabilities
        merupakan total liabiltas (sebagaimana jumlah                         (as the amount in the statement of financial
        dalam laporan posisi keuangan) dikurangi kas                          position) minus cash and cash equivalents and
        dan setara kas dan kas yang dibatasi                                  restricted cash.
        penggunaannya.
        Rasio utang terhadap modal pada tanggal 30                            Debt to capital ratio as of September 30, 2024
        September 2024 dan 31 Desember 2023 adalah                            and December 31, 2023 are as follows:
        sebagai berikut:
                                                   30 September/          31 Desember/
                                                 September 30, 2024     December 31, 2023
                                                        Rp                     Rp
        Total Liabilitas                           80.580.993.627.230     83.994.385.906.808                                   Total Liabilities
        Dikurang:                                                                                                                      Deduct:
          Kas dan Setara Kas                        1.369.466.405.905      1.340.065.112.240                      Cash and Equivalents Cash
          Kas yang Dibatasi Penggunaannya           3.182.399.375.477      6.698.167.060.090                                Restricted Cash
        Liabilitas Bersih                          76.029.127.845.848     75.956.153.734.478                                    Net Liabilities
        Total Ekuitas                               8.091.174.060.267     11.601.511.551.159                                       Total Equity
        Rasio Utang terhadap Modal                              9,40                   6,55                             Net Debt to Equity Ratio


   d.   Risiko Legal                                                    d.    Legal Risk
        Risiko legal berupa tuntutan pidana maupun                            Legal risks in the form of criminal charges or
        gugatan perdata dapat terjadi apabila terdapat                        civil suits can occur if there is (or is fulfilled) an
        (atau terpenuhinya) unsur Perbuatan Melawan                           element of illegal acts. Actions against the law
        Hukum. Perbuatan melawan hukum adalah                                 are actions taken by the Company in carrying
        tindakan yang dilakukan oleh Perusahaan                               out operational activities and/or corporate
        dalam menjalankan kegiatan operasi dan/atau                           actions that are contrary to applicable
        aksi korporasi yang bertentangan dengan                               regulations.
        regulasi yang berlaku.
        Upaya mitigasi yang telah dan akan tetap                              Mitigation efforts that have been and will
        dilakukan oleh Perusahaan untuk menghindari                           continue to be carried out by the Company to
        terjadinya perbuatan melawan hukum adalah                             avoid illegal acts are to review every operational
        melakukan review atas setiap kegiatan operasi                         activity and/ or corporate action based on
        dan/ atau aksi korporasi berdasarkan regulasi                         applicable regulations before deciding to carry
        yang      berlaku     sebelum     memutuskan                          out a transaction. To ensure a controlled legal
        menjalankan transaksi. Untuk memastikan                               risk framework and maintain business
        kerangka risiko legal yang terkendali dan tetap                       continuity, the Company carries out:
        menjaga keberlangsungan usaha, Perusahaan
        melakukan:

        •    Analisis risiko atas suatu transaksi yang                        •      Risk analysis of a transaction to be carried
             akan dilakukan, dan                                                     out, and
        •    Review atas perjanjian yang akan ditanda-                        •      Review of the agreement to be signed.
             tangani.

        Kegiatan review tersebut dapat dilakukan                              The review activity can be carried out in-house
        secara in-house atau dengan melibatkan                                or by involving a Company Legal Consultant.
        Konsultan Hukum Perusahaan.



                                                             - 215 -
Page 219
PT WASKITA KARYA (PERSERO) Tbk                                                    PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                 NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                        FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                  FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                        ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                         (Expressed in Rupiah, unless otherwise stated)

60. KOMITMEN DAN KONTIJENSI                                      60. COMMITMENT
                                                                       6        AND CONTINGENCY

   Perusahaan                                                           The Company

   Berdasarkan akta notaris Eny Sapratila, S.H., M.Kn.,                 Based on the notarial deed of Eny Sapratila, S.H.,
   Notaris No. 18 tanggal 31 Agustus 2023 telah                         M.Kn., Notary No. 18 dated August 31, 2023, a Joint
   dibentuk Kerjasama Operasi (KSO) antara                              Operation (JO) has been formed between the
   Perusahaan dengan PT Nindya Karya dan PT Len                         Company and PT Nindya Karya and PT Len Railway
   Railway Systems dengan nama Waskita - Nindya -                       Systems with the name JO Waskita - Nindya – LRS
   LRS     KSO     untuk    pelaksanaan      pekerjaan                  for the implementation of construction work for the
   pembangunan Konstruksi Light Rail Transit (LRT)                      Jakarta Light Rail Transit (LRT) Construction, Phase
   Jakarta, Phase 1B, Velodrome Manggarai Nomor                         1B, Velodrome Manggarai Number Project P1B1
   Proyek P1B1 Kontrak Paket Civil dan Railway                          Civil and Railway System Package Contract
   System yang dilaksanakan secara ventura bersama.                     implemented as a joint venture.

   WSE                                                                  WSE

   WSE menandatangani Power Purchase Agreement                          WSE entered into Power Purchase Agreement
   (PPA) pada tanggal 23 Maret 2015 dengan PLN.                         (PPA) on March 23, 2015 with PLN. Under the
   Berdasarkan      ketentuan      PPA,      PLN     telah              terms of the PPA, PLN has committed to purchase
   berkomitmen untuk membeli kapasitas pembangkit                       the available capacity of the WSE’s power stations
   listrik WSE dan seluruh hasil listrik selama dua puluh               and all generated of electricity for a period of twenty
   tahun sampai 2036.                                                   years until 2036.

   WSE      telah    membangun,      memiliki   dan                     WSE has build, owned and operated the plant
   mengoperasikan fasilitas pabrik yang berlokasi di                    facilities at site which is located at South Solok,
   Solok Selatan, Sumatera Barat.                                       West Sumatera.

   Setelah beroperasi secara komersial dalam proyek,                    Upon commercial operation of the Project, WSE is
   WSE berkewajiban menyediakan kepada PLN                              obligated to make available to PLN the net electrical
   keluaran listrik bersih dari fasilitas proyek, yang akan             output of the project's plant facilities, which will be
   dibeli oleh PLN pada jumlah yang ditentukan                          purchased by PLN at amounts determined under
   berdasarkan formula yang tercantum dalam PJBL.                       formula set forth in the PJBL. The amount to be paid
   Jumlah yang harus dibayar oleh PLN adalah jumlah                     by PLN is the amount of net electrical output
   keluaran listrik bersih yang dihasilkan. Jangka waktu                produced. The term of the PPA commenced on
   PPA dimulai pada tanggal 9 Desember 2016 dan                         December 9, 2016 and will expire on December 9,
   akan berakhir pada tanggal 9 Desember 2036,                          2036, unless terminated earlier in accordance with
   kecuali diakhiri lebih awal sesuai dengan ketentuan                  the terms of the PPA, as amended.
   PPA, sebagaimana telah diubah.

   Seluruh pihak sepakat harga energi listrik terukur                   All parties agreed electricity price estimated on
   pada titik transaksi, yaitu:                                         transaction points as stated:
     i. Rp1.182,50 per kWh untuk tahun ke-1 sampai                       i. Rp1,182.50 per kWh for year-1 through year-8
        dengan tahun ke-8 sejak tanggal operasi                             since the date of plant’s commercial operation;
        komersial pembangkit; dan                                           and
    ii. Rp825 per kWh untuk tahun ke-9 sampai                           ii. Rp825 per kWh for year-9 through year-20
        dengan tahun ke-20 sejak tanggal operasi                            since the date of plant’s commercial operation.
        komersial pembangkit.
   PLN memiliki opsi untuk membeli hak, kepemilikan,                    PLN has an option to purchase the WSE's right, title
   dan kepentingan WSE dalam proyek dengan nilai                        and interest in the project for a termination value
   terminasi berdasarkan formula tertentu yang                          based on a certain formula set forth in the PPA.
   tercantum dalam PPA. Harga beli yang harus                           The purchase price to be paid by PLN, in case PLN
   dibayar oleh PLN, dalam hal PLN melakukan opsi                       exercises the purchase option, decreases as the
   pembelian, mengalami penurunan seiring menjelang                     end of the PPA approaches.
   berakhirnya PPA.
   Pada tanggal 1 Juni 2016, WSE dan PLN                                On June 1, 2016, WSE and PLN entered into
   menandatangani amandemen PPA terkait kewajiban                       the amendment to the PPA regarding obligation and
   dan tanggung jawab para pihak, pembangunan                           responsibilities of both parties, construction of power
   pembangkit dan pembayaran yang diizinkan                             plants and payment, which is allowed under
   berdasarkan PPA awal, jika disetujui kedua belah                     the original PPA, if agreed by both parties. Under

                                                              - 216 -
Page 220
PT WASKITA KARYA (PERSERO) Tbk                                              PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                           NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                  FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                            FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                  ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                          AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                   (Expressed in Rupiah, unless otherwise stated)

   pihak. Di bawah PPA, kedua belah pihak sepakat                 the PPA, both parties agreed to amend certain
   untuk mengubah hal-hal tertentu dari PPA awal.                 matters of the original PPA.

   WKR                                                            WKR
   Dalam rangka melakukan kegiatan usaha, WKR                     In connection with its operations, WKR entered into
   memiliki perjanjian-perjanjian penting. Perjanjian             significant agreements. The significant agreements
   dan ikatan penting yang masih berlaku sampai                   and commitments applied until September 30, 2024
   dengan tanggal 30 September 2024 adalah sebagai                are as follows:
   berikut:

   a. Perjanjian     dengan     PT   Dafam     Hotel              a. Agreement with PT Dafam Hotel Management
   Management
   Pada tanggal 24 Maret 2016, WKR menandatangani                 Based on the Deed No. 2 dated March 24, 2016,
   perjanjian No. 2 dengan PT Dafam Hotel                         WKR entered into management agreement with
   Management (Operator). Berdasarkan perjanjian                  PT Dafam Hotel Management (the Operator). Based
   tersebut,  PT     Dafam     Hotel Management                   on the agreement, PT Dafam Hotel Management is
   bertanggungjawab sebagai operator atas Hotel                   responsible as the operator of Hotel Dafam
   Dafam Teraskita milik WKR.                                     Teraskita owned by WKR.
   Jangka waktu perjanjian adalah 10 (sepuluh) tahun              The period of the agreement is 10 (ten) years since
   sejak ditandatanganinya perjanjian dan dapat                   the signing date of this agreement and could be
   diperpanjang jika disetujui oleh kedua belah pihak             renewed if agreed upon by both parties at least 90
   paling lambat 90 hari kerja sebelum tanggal                    working days before the expiration date.
   berakhirnya.
   Berdasarkan perjanjian tersebut, para pihak                    Based on those agreements, all parties agreed that
   menyetujui bahwa PT Dafam Hotel Management                     PT Dafam Hotel Management as Operator entitled
   sebagai Operator berhak menerima:                              to receive:
   1.   Technical     Assistant       Fee    sebesar              1.   Technical Assistant Fee amounting to
        Rp600.000.000 yang dibayarkan pada tanggal                     Rp600,000,000 which has been paid on May 26,
        26 Mei 2015.                                                   2015.
   2.   Base fee sebesar 2% pada tahun pertama dan                2.   Base fee of 2% for the first year and 2,5% for
        2,5% di tahun-tahun berikutnya dari Total                      following years from of Total Operating
        Pendapatan Operasional.                                        Revenue.
   3.   Incentive Fee berdasarkan tinggi rendahnya                3.   Incentive Fee based on high and low of Gross
        Gross Operating Profit (GOP):                                  Operating Profit (“GOP”):
        a. 0% dari GOP apabila GOP kurang dari 35%                     a. 0% of GOP if GOP is less than 35% of Total
            dari Pendapatan Hotel Total;                                    Revenue Hotel;
        b. 5% dari GOP apabila GOP lebih dari 35%                      b. 5% of GOP if GOP is more than 35% and
            dan kurang dari atau sama dengan 45%                            less than or equivalent with 45% of Total
            dari Pendapatan Hotel Total; dan                                Revenue Hotel; and
        c. 7% dari GOP apabila GOP lebih dari 45%                      c. 7% of GOP if GOP is more than 45% of
            dari Pendapatan Hotel Total.                                    Total Revenue Hotel.
   4.   Sales and marketing fee adalah 1% dari                    4.   Sales and marketing fee are 1% of the gross
        pendapatan kotor kamar per bulan.                              revenue room per month.

   b. Perjanjian KSO dengan PT Sirius Terang                      b. Joint Venture Agreement with PT Sirius
   Cemerlang                                                      Terang Cemerlang
   Pada tanggal 26 Mei 2015, WKR menandatangani                   On May 26, 2015, WKR entered into joint venture
   kontrak perjanjian KSO No. 166 dengan PT Perintis              agreement No. 166 with PT Perintis Triniti Properti
   Triniti Properti dan PT Perintis Trusmi Properti               and PT Perintis Trusmi Properti in order to develop
   dalam rangka pengembangan tanah seluas 5.000                   5,000 sqm land areas at Jalan Sutera Boulevard,
   m2 yang terletak di Jalan Sutera Boulevard, Alam               Alam Sutera, Tangerang. The agreement ends
   Sutera, Tangerang. Perjanjian ini berakhir apabila             when the execution of the joint venture’s project
   pelaksanaan pekerjaan proyek KSO telah selesai                 work has been completed demonstrated with the
   dengan dibuktikannya telah habisnya masa                       expiration of the maintenance work of the contractor
   pemeliharaan pekerjaan kontraktor dan KSO, serta               and joint venture, as well as all rights and
   seluruh hak dan kewajiban antara KSO dengan                    obligations between the joint venture and a buyer, a
   pembeli, pihak ketiga, Instansi Pemerintah yang                third party, government agencies involved and is
   terkait dan berwenang dalam rangka pelaksanaan                 competent in the implementation and completion of

                                                        - 217 -
Page 221
PT WASKITA KARYA (PERSERO) Tbk                                                PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                             NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                    FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                              FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                    ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                            AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                     (Expressed in Rupiah, unless otherwise stated)

   dan penyelesaian KSO telah terpenuhi semuanya                    the joint venture has been fulfilled without causing
   tanpa menimbulkan tunggakan kewajiban.                           arrears of obligations.

   Komposisi penyertaan modal terdiri dari WKR                      The composition of capital participation consists of
   sebesar 40,8%, PT Perintis Triniti Properti sebesar              WKR at 40.8%, PT Perintis Properti Triniti at 39.2%,
   39,2%, dan PT Perintis Trusmi Properti sebesar                   and PT Perintis Trusmi Properti at 20% with an
   20%      dengan     modal        awal       sebesar              initial capital of Rp125,000,000,000.
   Rp125.000.000.000.

   Pada tanggal 30 Oktober 2015, terdapat pembaruan                 On October 30, 2015, there is a          renewal of
   perjanjian KSO Waskita Triniti II. Disepakati bahwa              the KSO Waskita Triniti II agreement. It was agreed
   posisi PT Perintis Triniti Properti digantikan oleh              that the position PT Perintis Triniti Properti is
   PT Sirius Terang Cemerlang. Seluruh hak dan                      replaced by PT Sirius Terang Cemerlang. All rights
   kewajiban PT Perintis Triniti Properti dialihkan                 and obligations of PT Perintis Triniti Properti is
   kepada PT Sirius Terang Cemerlang.                               transferred to PT Sirius Terang Cemerlang.

   Berdasarkan Akta No. 9 tanggal 3 Oktober 2016,                   Based on the Deed No. 9 dated October 3, 2016,
   terdapat perubahan perjanjian KSO Waskita Triniti II             there is a change of the KSO Waskita Triniti II
   yang berisi komposisi penyertaan modal yang baru,                agreement which contains the composition of new
   yaitu     WKR       sebesar      50,8%       atau                capital participation, namely WKR of 50.8% or
   senilai Rp69.646.800.000 dan PT Sirius Terang                    equivalent to Rp69,646,800,000 and PT Sirius
   Cemerlang     sebesar     49,2%    atau    senilai               Terang Cemerlang by 49.2% or equivalent to
   Rp67.453.200.000.                                                Rp67,453,200,000.

   c. Perjanjian KSO dengan PT Darmo Permai                         c. Joint Venture Agreement with         PT Darmo
                                                                    Permai

   Pada tanggal 21 Mei 2014, WKR menandatangani                     On May 21, 2014, WKR entered into KSO
   kontrak perjanjian KSO No. 6 dengan PT Darmo                     agreement No. 6 with PT Darmo Permai in order to
   Permai dalam rangka pengembangan tanah seluas                    develop 34,089 sqm land areas at Segi 8 Darmo
   34.089 m2 yang terletak di Segi 8 Darmo Jalan                    Jalan Raya Darmo Permai III, Surabaya Barat.
   Raya Darmo Permai III, Surabaya Barat.

   Perjanjian ini berakhir apabila pelaksanaan                      The agreement ends when the execution of the joint
   pekerjaan proyek KSO telah selesai dengan                        venture’s project work has been completed
   dibuktikannya telah habisnya masa pemeliharaan                   demonstrated       with     the     expiration     of
   pekerjaan kontraktor dan KSO, serta seluruh hak                  the maintenance work of the contractor and joint
   dan kewajiban antara KSO dengan pembeli, pihak                   venture, as well as all rights and obligations
   ketiga, Instansi Pemerintah yang terkait dan                     between the joint venture and a buyer, a third party,
   berwenang dalam rangka pelaksanaan dan                           government agencies involved and is competent in
   penyelesaian KSO telah terpenuhi semuanya tanpa                  the implementation and completion of the joint
   menimbulkan tunggakan kewajiban.                                 venture has been fulfilled without causing arrears of
                                                                    obligations.

   Komposisi penyertaan modal terdiri dari WKR                      composition of new capital participation consists of
   sebesar 51%, PT Darmo Permai sebesar 49%                         WKR at 51%, PT Darmo Permai at 49% with an
   dengan modal awal sebesar Rp426.112.500.000.                     initial capital of Rp426,112,500,000.

   d. Perjanjian KSO dengan PT Graha Jasa                           d. Joint Venture Agreement with PT Graha Jasa
   Ekatama                                                          Ekatama

   Pada tanggal 6 Juni 2016, WKR menandatangani                     On June 6, 2016, WKR entered into KSO agreement
   kontrak perjanjian KSO No. 17 dengan PT Graha                    No. 17 with PT Graha Jasa Ekatama in order to
   Jasa Ekatama dalam rangka pengembangan tanah                     develop 11,090 sqm at West Pejaten, South
   seluas 11.090 m2 di Pejaten Barat, Jakarta Selatan.              Jakarta. The        agreement        ends       when
   Perjanjian ini berakhir apabila pelaksanaan                      the execution of the joint venture’s project work has
   pekerjaan proyek KSO telah selesai dengan                        been completed demonstrated with the expiration of
   dibuktikan telah habisnya masa pemeliharaan                      the maintenance work of the contractor and joint
   pekerjaan kontraktor dan KSO, serta seluruh hak                  venture, as well as all rights and obligations
   dan kewajiban antara KSO dengan pembeli, pihak                   between the joint venture and a buyer, a third party,
   ketiga, Instansi Pemerintah yang terkait dan                     government agencies involved and is competent in
   berwenang dalam rangka pelaksanaan dan                           the implementation and completion of the joint
   penyelesaian KSO telah terpenuhi semuanya tanpa                  venture has been fulfilled without causing arrears
                                                          - 218 -
Page 222
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

   menimbulkan tunggakan kewajiban. Komposisi                        of obligations. Composition of new capital
   penyertaan modal di dalam KSO Waskita Ekatama                     participation in the Waskita Ekatama joint venture
   terdiri dari WKR sebesar 60%, PT Graha Jasa                       consists of WKR at 60%, PT Graha Jasa Ekatama
   Ekatama sebesar 40% dengan modal awal                             at 40% with initial capital of Rp331,000,000,000.
   sebesar Rp331.000.000.000.

   e. Perjanjian KSO dengan PT Rajawali Nusantara                    e. Joint Venture Agreement with PT Rajawali
   Indonesia                                                         Nusantara Indonesia

   Pada     tanggal   10   Oktober    2016,   WKR                    On October 10, 2016, WKR entered into KSO
   menandatangani kontrak perjanjian KSO No. 2079                    agreement No. 2079 with PT Rajawali Nusantara
   dengan PT Rajawali Nusantara Indonesia dalam                      Indonesia in order to develop 7,025 sqm of land at
   rangka pengembangan tanah seluas 7.025 m2 di                      Jalan MT. Haryono Kav 12-13, East Jakarta.
   Jalan MT. Haryono Kav 12-13, Jakarta Timur.                       The operating periods is valid for 48 months and
   Jangka waktu operasi berlaku selama 48 bulan dan                  the agreement ends when the execution of
   perjanjian ini berakhir apabila pelaksanaan                       the joint venture’s project work has been completed,
   pekerjaan proyek KSO telah selesai dengan                         demonstrated with the expiration of the maintenance
   dibuktikan telah habisnya masa pemeliharaan                       work of the contractor and joint venture, as well as
   pekerjaan kontraktor dan KSO, serta seluruh hak                   all rights and obligations between the joint venture
   dan kewajiban antara KSO dengan pembeli, pihak                    and a buyer, a third party, government agencies
   ketiga, Instansi Pemerintah yang terkait dan                      involved and is competent in the implementation and
   berwenang dalam rangka pelaksanaan dan                            completion of the joint venture has been fulfilled
   penyelesaian KSO telah terpenuhi semuanya tanpa                   without causing arrears of obligations.
   menimbulkan tunggakan kewajiban.

   Komposisi penyertaan modal di dalam KSO RNI -                     The composition of the capital investment in
   Waskita terdiri dari RNI berupa tanah seluas 7.052                the KSO RNI - Waskita consists of RNI with land
   m2, dan      WKR        berupa     modal      kerja               areas of 7,052sqm and WKR with initial capital of
   sebesar Rp361.912.928.457.                                        Rp361,912,928,457.

   Pada akhir periode perjanjian KSO, RNI akan                       At the end of joint venture agreement, RNI will
   menerima bagi hasil senilai Rp367.544.705.882.                    receive   profit    sharing    amounting    to
                                                                     Rp367,544,705,882.

   f. Perjanjian Pengaturan Bersama - PT Dalawa                      f. Joint Arrangement Agreement - PT Dalawa
   Paralia Lepang                                                    Paralia Lepang

   Pada tanggal 5 Mei 2015, WKR menandatangani                       On May 5, 2015, WKR entered into joint venture
   kontrak perjanjian KSO No. 2 dengan PT Dalawa                     agreement No. 2 with PT Dalawa Paralia Lepang in
   Paralia Lepang dalam rangka pengembangan tanah                    order to develop 29,020m2 land areas at Kelurahan
   seluas 29.020m2 yang terletak di Kelurahan Gelgel,                Gelgel, Kabupaten Klungkung, Bali..
   Kabupaten Klungkung, Bali

   g. Perjanjian Pengaturan Bersama - PT Makaland                    g. Joint Arrangement Agreement - PT Makaland
   Indo Asia                                                         Indo Asia

   Pada tanggal 24 Maret 2020, WKR menandatangani                    On March 24, 2020, WKR entered into joint venture
   kontrak perjanjian KSO No. 25 dengan PT Makaland                  agreement No. 25 with PT Makaland Indo Asia in
   Indo Asia dalam rangka pengembangan tanah                         order to develop 1,592m2 m2 land areas at Jalan
   seluas 1.592m2 m2 yang terletak di Jalan Tentara                  Tentara    Pelajar,  Kelurahan  Grogol     Utara,
   Pelajar, Kelurahan Grogol Utara, Kecamatan                        Kecamatan Kebayoran Lama, Jakarta Selatan.
   Kebayoran Lama, Jakarta Selatan. Komposisi                        The composition of shareholders consists of
   penyertaan saham terdiri dari Perusahaan sebesar                  the Company amounting 40.8% and PT Makaland
   70% dan PT Makaland Indo Asia sebesar 30%.                        Indo Asia amounting 20%.

   h. Perjanjian dengan KSO Waskita Triniti                          h. Agreement with KSO Waskita Triniti

   Pada tanggal 15 November 2016, WKR                                On November 15, 2016, WKR entered into
   menandatangani        perjanjian     perikatan   No.              agreement No. 001/KB/WKR-KSO/XI/2016 with
   001/KB/WKR-KSO/XI/2016 dengan KSO Waskita                         KSO Waskita Triniti related to the acquisition of five
   Triniti terkait pembelian lima unit ruang kantor unit             units’ office space unit Brooklyn from KSO Waskita
   Brooklyn milik KSO Waskita Triniti dengan nilai                   Triniti amounting to Rp20,816,327,272. The maturity
   perikatan sebesar Rp20.816.327.272. Jatuh tempo                   date of debt is on December 28, 2019 with

                                                           - 219 -
Page 223
PT WASKITA KARYA (PERSERO) Tbk                                                                                   PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                                                               AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                                                                NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                                                       FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                                                                 FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                                                       ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                                                               AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                                                        (Expressed in Rupiah, unless otherwise stated)

   pinjaman ini sampai dengan 28 Desember 2019                                                        installment payment method.
   yang pembayarannya dilakukan secara bertahap.

   i. Perjanjian KSO RNI - WSKT                                                                       i. Agreement KSO RNI - WSKT

   Pada tanggal 20 November 2017, KSO RNI –                                                           On November 20, 2017, KSO RNI - Waskita entered
   Waskita membuat perjanjian Pengikatan Jual Beli                                                    into agreement with WSKT No. 04 on sale of office
   (PPJB) dengan WSKT No. 04 tentang penjualan                                                        space owned by KSO RNI Waskita project
   ruang perkantoran pada proyek KSO RNI Waskita                                                      amounting to Rp563,310,000,000 before VAT and
   dengan nilai jual Rp563.310.000.000 sebelum PPN                                                    has been revised with No. 01/AMD/PPJB/KSO/RNI-
   dan terakhir dilakukan amandemen dengan No:                                                        WASKITA/2018 dated July 13, 2018. The payment
   01/AMD/PPJB/KSO/RNI-WASKITA/2018 tanggal 13                                                        made by installment basis untill the completion of
   Juli 2018. Pembayaran atas penjualan ini dilakukan                                                 development and Buy and Sell Deed signed
   secara bertahap sampai dengan penyelesaian                                                         between both of sides.
   pembangunan dan Akta Jual Beli ditandatangani
   kedua belah pihak.

   j. Perjanjian KSO Waskita Bersama Vision First                                                     j. Agreement KSO Waskita Bersama Vision First

   Pada    tanggal    15  Oktober    2021,   WKR                                                      On October 15, 2021, WKR entered into agreement
   menandatangani perjanjian Kerja Sama Operasi                                                       with PT Wasita Beton Precast Tbk, PT Tower
   (KSO) dengan PT Wasita Beton Precast Tbk, PT                                                       Bersama, PT City Vision dan PT Developing
   Tower Bersama, PT City Vision dan PT Developing                                                    Indonesia No. 73 related to Dukuh atas
   Indonesia No. 73 terkait proyek jembatan                                                           multipurpose pedestrian bridge and Sudirman
   penyeberangan multiguna Dukuh Atas dan Stasiun                                                     Station project in Jakarta.
   Sudirman di Jakarta.

61. REKLASIFIKASI AKUN                                                                       61. RECLASSIFICATION OF ACCOUNTS

   Reklasifikasi tertentu telah dilakukan terhadap                                                     Certain reclassifications have been made to
   laporan     keuangan     konsolidasian   periode                                                    the prior year’s consolidated financial statements to
   sebelumnya untuk meningkatkan keterbandingan                                                        enhance comparability with the current period’s
   dengan laporan keuangan konsolidasian periode                                                       consolidated financial statements.
   berjalan.

   Akibatnya, pos-pos tertentu telah diubah di laporan                                                 As a result, certain line items have been amended in
   posisi keuangan konsolidasian, laporan laba rugi                                                    the consolidated statement of financial position,
   dan penghasilan komprehensif lain dan catatan atas                                                  profit or loss and other comprehensive income and
   laporan keuangan konsolidasian terkait. Angka                                                       the related notes to the consolidated financial
   komparatif telah disesuaikan dengan penyajian                                                       statements. Comparative figures have been
   periode berjalan.                                                                                   adjusted to conform to the current period’s
                                                                                                       presentation.

                                                                             31 Desember/ December 31 , 2023
                                                    Sebelum Reklasifikasi/           Reklasifikasi/          Setelah Reklasifikasi/
                                                     Before Reclassified            Reclassification           As Reclassified
                                                             Rp                            Rp                         Rp

   Piutang Usaha - Bersih                                                                                                                                       Accounts Receivables - Net
     Pihak Berelasi                                       1.128.731.788.636                161.560.527.488          1.290.292.316.124                                     Related Parties
     Pihak Ketiga                                           521.591.791.974                108.471.869.701            630.063.661.675                                         Third Parties
   Uang Muka dan Biaya Dibayar Dimuka                       811.102.644.464              (270.032.397.189)            541.070.247.275                           Advances and Prepayments
   Utang Usaha                                            5.661.220.681.629                177.796.237.262          5.839.016.918.891                                     Accounts Payable
   Utang Pajak Jangka Pendek                              2.778.029.021.039              (177.796.237.262)          2.600.232.783.777                          Short-Term Taxes Payables
   Utang Bank Jangka Pendek                                                                                                                                         Short-Term Bank Loans
     Pihak Berelasi                                          20.504.115.167               (20.504.115.167)                            --                                  Related Parties
   Utang Bank Jangka Panjang                                                                                                                                           Current Maturities of
     yang Jatuh Tempo dalam Setahun                       1.075.221.017.962                20.504.115.167           1.095.725.133.129                              Long-Term Bank Loan
   Utang Lembaga Keuangan Non-Bank                                                                                                                   Loan to Financial Institution Non-Bank
     Bagian Jangka Pendek                                                                                                                                              Short-Term Portion
     Pihak Ketiga                                                            --            58.302.600.000              58.302.600.000                                         Third Parties
   Utang Lembaga Keuangan Non-Bank                                           --            10.404.445.428              10.404.445.428                Loan to Financial Institution Non-Bank
   Utang Lembaga Keuangan Non Bank Jangka Panjang                                                                                          Long-Term Loan to Financial Non-Bank Institutions
     Pihak Ketiga                                         1.099.421.185.155               (68.707.045.428)          1.030.714.139.727                                         Third Parties




                                                                                       - 220 -
Page 224
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

   Manajemen menilai bahwa reklasifikasi akun yang                   Management has assessed that the reclassification
   disebutkan diatas tidak mempunyai dampak yang                     of the abovementioned accounts has no material
   material terhadap informasi dalam laporan posisi                  impact on the information in the consolidated
   keuangan konsolidasian.                                           statement of financial position.

63. KELANGSUNGAN USAHA                                        63. GOING CONCERN

   Untuk periode – periode sembilan bulan yang                       For the nine month periods ending September 30,
   berakhir pada 30 September 2024, Grup telah                       2024, the Group has experienced a deficit of
   mengalami defisit sebesar Rp3.614.492.047.967,                    Rp3,614,492,047,967, resulting in a accumulated
   yang mengakibatkan akumulasi defisit menjadi                      deficit of Rp14,977,451,800,815.
   sebesar Rp14.977.451.800.815.

   Manajemen secara aktif memantau kondisi                           Management is actively monitoring the Group’s
   keuangan dan kinerja Grup serta mengeksplorasi                    financial   condition    and    performance    while
   dan menjalankan strategi-strategi berikut sebagai                 continually exploring and implementing strategies in
   upaya dalam memitigasi risiko pada kinerja                        an effort to mitigate risks to the Group’s financial
   keuangan dan keberlangsungan usaha Grup, antara                   performance and business continuity, including the
   lain sebagai berikut:                                             following:

   1.   Mengimplementasi dan memonitoring secara                     1.   Implementing and   regularly monitoring
        berkala atas inisiatif 8 stream penyehatan                        the Company's 8 stream financial health
        keuangan Perseroan.                                               improvement.

   2.   Menyelesaikan proses restrukturisasi bersama                 2.   Completing the restructuring process together
        dengan Konsultan Konsorsium dalam rangka                          with the Consortium Consultant to rearrange
        mengatur kembali ketentuan-ketentuan yang                         the provisions in the existing documents of
        ada dalam dokumen instrumen utang perbankan                       the Company's banking debt and bond debt
        dan utang obligasi Perseroan. Dalam hal ini,                      instruments. The Company proposes adjusting
        Perseroan mengusulkan penyesuaian skema                           the debt settlement scheme for the Company's
        penyelesaian utang atas instrumen utang                           banking debt and bond debt instruments
        perbankan dan utang obligasi Perseroan sesuai                     according to its financial capabilities in both
        dengan kemampuan keuangan baik dalam                              the short and long term.
        jangka pendek maupun jangka panjang.

   3.   Sampai dengan September 2024 seluruh                         3.   Until September 2024, all Banking Creditors
        Kreditur Perbankan telah menyetujui usulan                        have approved the Company's Restructuring
        Restrukturisasi Perseroan dimana seluruh                          proposal where all MRA Banking Creditors,
        Kreditur Perbankan MRA yang berjumlah 21                          totaling 21 Banks, have signed the Master
        Bank     telah     menandatangani     Perjanjian                  Restructuring Agreement. Meanwhile, all KMK
        Restrukturisasi Induk Perubahan. Adapun,                          Guarantee Banking Creditors and Guarantee
        seluruh Kreditur Pebankan KMK Penjaminan                          Stakeholders have approved the proposed
        dan Stakeholder Penjaminan telah menyetujui                       extension of the KMK Guarantee Maturity and
        Usulan Perpanjangan Jatuh Tempo KMK                               changes to other provisions in the KMK
        Penjaminan dan perubahan ketentuan lainnya                        Guarantee agreement. In addition, 3 of the 4
        dalam perjanjian KMK Penjaminan. Selain itu, 3                    bond series have been effectively restructured.
        dari 4 seri Obligasi telah efektif di dilakukan                   Currently, the Company is in the process of
        restrukturisasi. Saat ini, Perseroan dalam                        fulfilling the effective requirements for changes
        proses pemenuhan syarat-syarat efektif atas                       to the MRA and KMK Guarantee agreements
        perubahan       perjanjian MRA     dan     KMK                    which are targeted for completion in October
        Penjaminan yang ditargetkan selesai pada                          2024.
        Oktober 2024.

   4.   Memprioritaskan     pemilihan    proyek-proyek               4.   Prioritize the selection of projects with low risk
        dengan rendah risiko yang memiliki uang muka                      that have down payments and monthly payment
        dan skema pembayaran monthly payment demi                         scheme for the sustainability of the Group's
        keberlanjutan kegiatan operasional Grup.                          operational activities.

   Kemampuan       Grup    untuk   mempertahankan                    The Group’s ability to maintain its business as a
   kelangsungan usahanya dan menghadapi tantangan                    going concern and face external challenges
   eksternal bergantung pada kemampuan Grup untuk                    depends on the Group’s ability to generate sufficient
   menghasilkan arus kas yang cukup untuk memenuhi                   cash flow to meet its liabilities on a timely basis, as

                                                           - 221 -
Page 225
PT WASKITA KARYA (PERSERO) Tbk                                                 PT WASKITA KARYA (PERSERO) Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
CATATAN ATAS LAPORAN KEUANGAN                                              NOTES TO THE INTERIM CONSOLIDATED
KONSOLIDASIAN INTERIM                                                                     FINANCIAL STATEMENTS
UNTUK PERIODE-PERIODE SEMBILAN BULAN                                               FOR THE NINE MONTHS PERIODS
YANG BERAKHIR 30 SEPTEMBER 2024 DAN 2023                                     ENDED SEPTEMBER 30, 2024 AND 2023
DAN TAHUN YANG BERAKHIR 31 DESEMBER 2023                             AND FOR THE YEAR ENDED DECEMBER 31, 2023
(Disajikan dalam Rupiah, kecuali dinyatakan lain)                      (Expressed in Rupiah, unless otherwise stated)

   liabilitasnya secara tepat waktu, serta kemampuan                 well as the Group’s ability to have future profitable
   Grup       untuk    menjalankan     operasi  yang                 operations and improve its financial position.
   menguntungkan di masa depan dan meningkatkan
   posisi keuangannya.

   Laporan      keuangan       disusun      berdasarkan              The consolidated financial statements have been
   kelangsungan usaha yang mengasumsikan bahwa                       prepared on a going concern basis which assumes
   Grup akan mampu merealisasikan asetnya dan                        that the Group will be able to realize its assets and
   melunasi liabilitasnya dalam kegiatan bisnis normal               discharge its liabilities in the normal course of
   di masa mendatang. Asumsi kelangsungan usaha                      business in the foreseeable future. The going
   tunduk pada risiko dan ketidakpastian seperti yang                concern assumption is subject to risks and
   dijelaskan di atas, sehingga ada kemungkinan                      uncertainties as described above, so it is possible
   bahwa perubahan keadaan yang berdampak negatif                    that changes in circumstances that have a negative
   dapat berdampak pada kelangsungan usaha Grup.                     impact could impact the Group's business continuity.
   Jika perubahan keadaan tersebut terjadi, asumsi                   If such changes in circumstances occur, the Group's
   kelangsungan usaha Grup dapat berubah. Laporan                    business continuity assumptions may change. The
   keuangan tidak mencakup penyesuaian yang                          financial statements do not include adjustments that
   mungkin timbul dari hasil ketidakpastian di atas.                 may arise as a result of the above uncertainties.

64. PERISTIWA SETELAH PERIODE PELAPORAN                        64. EVENTS AFTER REPORTING PERIOD

   Berdasarkan surat No. 716/WBP/DIR/2024 tanggal 3                  Based on letter No. 716/WBP/DIR/2024 dated
   Oktober 2024 perihal Permohonan Banding atas                      October 3, 2024 regarding the Appeal Application
   Putusan Gugatan PT Bank DKI terhadap WBP,                         for the Decision on PT Bank DKI's Lawsuit against
   WBP telah mengajukan permohonan banding pada                      WBP, WBP has submitted an appeal application on
   2 Oktober 2024 berdasarkan Akta Pernyataan                        October 2, 2024 based on the Deed of Statement of
   Permohonan      Banding     Elektronik   dengan                   Electronic           Appeal            Application
   No.                         107/Tim/X/2024-AP.Jo                  No.                         107/Tim/X/2024-AP.Jo
   No. 5/Pdt.G/2024/PN.Jkt.Tim sebagai upaya hukum                   No. 5/Pdt.G/2024/PN.Jkt.Tim as a legal remedy for
   atas Putusan Pengadilan Negeri Jakarta Timur                      the East Jakarta District Court Decision
   dengan No. 5/Pdt.G/2024/PN.Jkt.Tim tanggal 19                     No. 5/Pdt.G/2024/PN.Jkt.Tim dated September 19,
   September 2024.                                                   2024.

   WBP berkomitmen untuk mematuhi ketentuan                          WBP is committed to complying with the provisions
   Perjanjian Perdamaian (homologasi) yang telah                     of the Peace Agreement (homologation) which has
   berkekuatan    hukum    tetap sesuai  Putusan                     permanent legal force in accordance with the
   Mahkamah Agung nomor 1455K/Pdt.Sus-Pailit/2022                    Supreme Court Decision number 1455K/Pdt.Sus-
   tanggal 20 September 2022.                                        Pailit/2022 dated September 20, 2022.

65. TANGGUNG    JAWAB  MANAJEMEN  DAN                          65. MANAGEMENT      RESPONSIBILITY   AND
    PERSETUJUAN ATAS LAPORAN KEUANGAN                              APPROVAL     OF   THE   CONSOLIDATED
    KONSOLIDASIAN                                                  FINANCIAL STATEMENTS

   Penyusunan dan penyajian wajar laporan keuangan                   The preparation and fair presentation of
   konsolidasian     merupakan      tanggung     jawab               the    consolidated    financial statements  is
   manajemen, dan telah di setujui oleh direktur untuk               the responsibility of management, and has been
   diterbitkan pada tanggal 10 Oktober 2024.                         approved by the director to be published on
                                                                     October 10, 2024.

                                                          *******




                                                           - 222 -
Page 226

          

File

File Open PDF
Source IDX
Size4.21 MB
Published14 Oct 2024
Pages226
Characters1,838,412
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 195 people and organisations named in the text · linked when the evidence is strong

linked org Waskita Beton Precast Tbk p.12 ×51
linked org Bank Mega Tbk p.13 ×38
linked org Bank KB Bukopin Tbk p.13 ×14
linked person Heru Winarko · Ketua p.15 ×4
linked person Muhamad Salim · Komisaris Independen p.15 ×5
linked person Addin Jauharudin p.15 ×5
linked person Dedi Syarif Usman · Anggota p.15 ×4
linked person Muhammad Hanugroho · Direktur Utama p.15 ×2
linked person Anton Rijanto · Direktur p.15
linked person Ratna Ningrum p.15
linked person Wiwi Suprihatno p.15 ×2
linked person Rudi Purnomo p.15 ×2
linked person Ari Asmoko p.15
linked person I Ketut Pasek Senjaya Putra p.15
linked person Dhetik Ariyanto p.15 ×2
linked person Mohamad Nasir p.15 ×2
linked org PT Waskita Toll Road p.17 ×9
linked org PT Waskita Karya Realty p.17 ×8
linked org PT Waskita Karya Infrastruktur p.17 ×8
linked org PT Waskita Sriwijaya Tol p.18 ×7
linked org PT Waskita Bumi Wira p.18 ×7
linked org PT Waskita Fim Perkasa Realti p.18 ×7
linked org PT Waskita Sangir Energi p.18 ×7
linked org PT Waskita Wado Energi p.18 ×11
linked org PT Trans Jabar Tol p.18 ×5
linked org PT Waskita Modern Realti p.25 ×3
linked org Bank Tabungan Negara (Persero) Tbk p.69 ×10
linked org Bank Mandiri (Persero) Tbk p.69 ×21
linked org Bank Syariah Indonesia Tbk p.69 ×20
linked org Bank CIMB Niaga Tbk p.69 ×2
linked org Bank Central Asia Tbk p.69 ×2
linked org PT Bank UOB Indonesia p.69
linked org Bank OCBC NISP Tbk p.69 ×2
linked org Bank Jtrust Indonesia Tbk p.69 ×2
linked org Bank Maybank Indonesia Tbk p.69 ×4
linked org Bank Mestika Dharma Tbk p.69 ×2
linked org Sukses Makmur p.69
linked org Bank Permata Tbk p.69 ×2
linked org Bank CTBC p.69
linked org PT Bank Rakyat p.103
linked org Indonesia Eximbank p.211
linked org PT Hutama Karya (Persero) p.211
possible org WASKITA KARYA (PERSERO) TBK p.1 ×387
possible org Otoritas Jasa Keuangan p.11 ×2
possible org Bursa Efek Indonesia p.12
possible person T. Iskandar · Komisaris p.15 ×2
possible person Muradi · Anggota p.15
possible org PT Waskita Modern Realty p.18 ×2
possible person Satria p.20 ×2
possible person Helmi p.22
possible org Negara Republik Indonesia p.22 ×2
possible org Waskita Beton Beton Precast Tbk p.24 ×2
possible person Henry p.26
possible org Bank Negara Indonesia (Persero) Tbk p.69 ×12
possible org Bank Rakyat Indonesia (Persero) Tbk p.69 ×11
possible org KJPP Firdaus p.104
possible person Ir. Sukardi p.104 ×4
possible person Firdaus, Ali p.104
unresolved org Bank Loans Utang Lembaga Keuangan Non-Bank p.5
unresolved org Bank Financial Institution Loans Pihak Berelasi p.5
unresolved org Bank Loans Penerimaan Pinjaman Lembaga Keuangan Non-Bank p.8
unresolved org Bank Financial Institution Loans Pembayaran Pinjaman Lembaga Keuangan p.8
unresolved org Limited Liability Corporation p.9
unresolved person Kartini Mulyadi p.9
unresolved org Minister of Law p.9 ×12
unresolved person Notary Ashoya Ratam p.9 ×6
unresolved org Kementerian Hukum dan Hak Asasi Manusia p.9
unresolved org Ministry of Law and Human Rights p.9 ×3
unresolved org Pengawas Pasar Modal dan Lembaga p.10
unresolved org Bapepam-LK p.10 ×4
unresolved org Financial Services Authority p.12 ×2
unresolved org Indonesia Stock Exchange p.12 ×2
unresolved org Waskita Beton Tbk p.12 ×2
unresolved org Precast Tbk p.12
unresolved org Beton Precast Tbk p.12
unresolved org Pengadilan Negeri Jakarta Pusat p.13
unresolved person Notary Dewantari Handayani p.14 ×3
unresolved org PT Precast II Tahun p.14
unresolved org Prakerja Tbk. p.14
unresolved org PT Waskita Beton Precast II p.14
unresolved org Karya (Persero) Tbk. p.15
unresolved person Zamroni · Anggota p.16
unresolved org Departemen p.16
unresolved org Departemen Infrastruktur III p.16
unresolved org Departemen Infrastruktur I p.17
unresolved org Departemen Infrastruktur II p.17
unresolved person Ermy Puspa Yunita p.17
unresolved person AS Wisnu p.17
unresolved org PT Pemalang Batang Toll Road p.18 ×2
unresolved org PT Waskita Transjawa Toll Road p.18 ×4
unresolved org PT Transjawa Paspro p.18 ×2
unresolved org PT Tol Teluk Balikpapan p.18 ×4
unresolved person Fathiah Helmi p.18 ×9
unresolved org Menteri Hukum dan Hak Asasi Manusia p.18 ×3
unresolved person Zulkifli Harahap p.18 ×2
unresolved org PT Pemalang Batang Tol Road p.19 ×2
unresolved person Bonardo Nasution p.19
unresolved org Menteri Hukum dan Hak p.19 ×8
unresolved person Jose Dima Satria S.H. · Notaris p.19 ×10
unresolved person Catur Virgo p.19 ×3
unresolved org Menteri Hukum dan Hak Asasi p.19 ×3
unresolved org PT WST p.19
unresolved person Ir. Nanette p.19 ×4
unresolved org Minister of Menteri p.20
unresolved org Menteri p.20 ×10
unresolved org PT Waskita MNC Transjawa Toll p.20
unresolved org PT Waskita MNC Road p.20
unresolved org PT Waskita MNC MNC Transjawa Toll Road p.21
unresolved person Ir. Nanette Cahyanie Handari Adi Jakarta. Bahwa p.21 ×3
unresolved person Warsito p.21
unresolved org PT WTTR p.21 ×2
unresolved org PT Transjawa TJPJT p.21 ×2
unresolved person Humberg Lie p.21 ×3
unresolved org Minister of Law and Human Rights Manusia p.21
unresolved person Humberg S.H. p.21
unresolved person Lie p.21 ×2
unresolved org Minister of Law and Human Asasi Manusia p.21
unresolved person Rina Utami Djauhari S.H. · Notaris p.21
unresolved person Cahyanie Handari Adi Warsito · Notaris p.22 ×2
unresolved person Ir. Nanette C.H. Nanette C.H. Adi Warsito p.22 ×4
unresolved org Minister of Hak Asasi Manusia Republik Indonesia p.22
unresolved org Minister of Kementerian Hukum dan Hak Asasi Manusia p.23
unresolved org PT Datindo Entrycom p.24 ×2
unresolved person Dewi Tenty Septi Artiany p.24 ×2
unresolved org Minister of Law and Human Kehakiman dan Hak Asasi Manusia Republik p.24
unresolved person Rosida Rajagukguk Siregar p.24 ×2
unresolved person Dewi Tenti Septi Artiany S.H. p.25
unresolved person Nenden Nimatulhayah p.25
unresolved person Nirmatulhayah p.25
unresolved org Menteri Kehakiman p.25
unresolved org PT Waskita Karya Karya Energi p.25
unresolved person Varinia p.25 ×2
unresolved org Minister of Law and Human Rights p.25 ×3
unresolved person Kokoh Henry p.26 ×3
unresolved org Kementerian p.26
unresolved org Koperasi Waskita. p.26
unresolved org Koperasi Waskita. The Deed p.26
unresolved org Minister of Law and Human Rights W p.27
unresolved org Minister of Law and Human No. AHU-AH. p.27
unresolved person Indah Khaerunnisa p.27 ×2
unresolved org Minister of Law and Human p.27
unresolved org Koperasi Waskita. Berdasarkan Berita Acara Pemenuhan p.27
unresolved org Bank Indonesia p.34
unresolved org Kementerian BUMN p.36
unresolved org Pengatur p.49 ×2
unresolved org Ministry of Public Works p.51
unresolved org Bank Tabungan Negara Syariah p.69 ×2
unresolved org PT Bank Syariah Mandiri p.69 ×2
unresolved org PT Bank BNI Syariah p.69 ×2
unresolved org Bank BRI Syariah Tbk p.69 ×2
unresolved org PT Bank Pembangunan Daerah Jawa Barat p.69
unresolved org Banten Tbk p.69
unresolved org PT Bank BCA Syariah p.69
unresolved org PT Bank DKI p.69
unresolved org PT Bank ICBC Indonesia p.69
unresolved org PT Bank BPR Intidana Sukses Makmur p.69
unresolved org PT Bank CTBC Indonesia p.69
unresolved org PT Bank Woori Saudara Indonesia p.69
unresolved org Bank Sumitomo Mitsui Indonesia p.69
unresolved org PT Bank Pembangunan Daerah Bali p.69
unresolved org PT Bank Mandiri Taspen p.69 ×2
unresolved org Indonesia (Persero) Tbk p.103 ×2
unresolved org KJPP Agus p.104
unresolved org KJPP Firdaus dan Rekan p.104
unresolved org Firdaus dan Partners p.104
unresolved org KJPP Sugeng p.104 ×2
unresolved org Gunawan dan Rekan p.104
unresolved org Kantor Jasa Penilai Publik Penilai Publik Muttaqin p.104
unresolved org Kantor Jasa Penilai Publik Sukandi p.104
unresolved org Pertanahan Nasional p.104
unresolved org Ali dan Rekan p.104
unresolved org Bank Garansi Tender p.110
unresolved org Bank Garansi Uang p.110
unresolved org Bank Garansi Pelaksanaan p.110
unresolved org Bank Garansi Retensi p.110
unresolved org Bank Garansi QHSE p.110
unresolved org PT Waskita Karya Realty. Based Karya Realty. p.110
unresolved org Pengadilan Negeri Jakata p.211
unresolved org Central Jakarta District Court p.211
unresolved org Government of the Republic of Indonesia p.211
unresolved org Kementerian Keuangan p.211
unresolved org Ministry of Finance p.211 ×2
unresolved org Kementerian Keuangan Pemerintah p.211
unresolved org Kementerian Keuangan Pemerintah Republik p.211
unresolved org Bank Garansi p.211 ×4
unresolved org PT Bank BRI p.211
unresolved org PT Jasamarga Solo Ngawi p.211
unresolved org PT Pejagan Pemalang Tol Road p.211
unresolved org PT Kertas Leces (Persero) p.211
unresolved org PT Istaka Karya (Persero) p.211

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 6

FinancialStatement-2024-III-WSKT.xlsx done
inlineXBRL.zip done
↑↓ select ↵ open ⇧↵ see every result