Skip to content
Back to announcement

Lapkeu GEMS Q1 2025.pdf

Financial statement Text extracted GEMS

Source file signed link, expires in 15 minutes

This browser can't display the PDF inline. Open it in a new tab.

Extracted text 127

Page 1
PT Golden Energy Mines Tbk
dan Entitas Anak/and Its Subsidiaries
Laporan Keuangan Konsolidasian Interim/
Interim Consolidated Financial Statements
Pada tanggal 31 Maret 2025 dan 31 Desember 2024
serta untuk Periode-periode Tiga Bulan yang Berakhir
31 Maret 2025 dan 2024/
As of March 31, 2025 and December 31, 2024
and for the Three-Month Periods Ended
March 31, 2025, and 2024
Page 2
PT GOLDEN ENERGY MINES Tbk DAN ENTITAS ANAK/AND ITS SUBSIDIARIES
DAFTAR ISI/TABLE OF CONTENTS



                                                                                                   Halaman/
                                                                                                     Page

Laporan Auditor Independen/Independent Auditor’s Report

Surat Pernyataan Direksi tentang Tanggung Jawab atas Laporan Keuangan Konsolidasian
  Interim PT Golden Energy Mines Tbk dan Entitas Anak pada tanggal 31 Maret 2025 dan
  31 Desember 2024 serta untuk Periode-periode Tiga Bulan yang Berakhir 31 Maret 2025 dan
  2024/
The Directors’ Statement on the Responsibility for the Interim Consolidated Financial Statements
  of PT Golden Energy Mines Tbk and Its Subsidiaries as of March 31, 2025 and
  December 31, 2024 and for the Three-Month Periods Ended March 31, 2025 and 2024

LAPORAN KEUANGAN KONSOLIDASIAN INTERIM - Pada Tanggal 31 Maret 2025 dan
   31 Desember 2024 serta untuk Periode-periode Tiga Bulan yang Berakhir 31 Maret 2025 dan
   2024/
INTERIM CONSOLIDATED FINANCIAL STATEMENTS - As of March 31, 2025 and
   December 31, 2024 and for the Three-Month Periods Ended March 31, 2025 and 2024

   Laporan Posisi Keuangan Konsolidasian Interim/
   Interim Consolidated Statements of Financial Position                                              1

   Laporan Laba Rugi dan Penghasilan Komprehensif Lain Konsolidasian Interim/
   Interim Consolidated Statements of Profit or Loss and Other Comprehensive Income                   3

   Laporan Perubahan Ekuitas Konsolidasian Interim/
   Interim Consolidated Statements of Changes in Equity                                               4

   Laporan Arus Kas Konsolidasian Interim/
   Interim Consolidated Statements of Cash Flows                                                      5

   Catatan atas Laporan Keuangan Konsolidasian Interim/
   Notes to Interim Consolidated Financial Statements                                                 6
Page 3
MIRAWATI SENSI IDRIS                                                                                       MOORE
Registered Public Accountants
Business License No. 1353/KM.l/2016
lntiland Tower, 8th Floor
JI. Jenderal Sudirman, Kav 32
Jakarta - 10220
INDONESIA

T +62-21-570 8lll
F +62-21-572 2737




           Laporan atas Reviu lnformasi Keuangan                       Report on Review of Interim Financial
                          Interim                                                  Information


     No. 00023/2.1090/AK/02/0155/1N/2025                       No. 00023/2.1090/AK/02/0155/1N/2025


                                                               The Stockholders, Board of Commissioners, and
     Pemegang Saham, Dewan Komisaris dan Direksi               Directors
     PT Golden Energy Mines Tbk                                PT Golden Energy Mines Tbk

     Pendahuluan                                               Introduction

    Kami telah mereviu laporan keuangan konsolidasian          We have reviewed the accompanying interim
    interim PT Golden Energy Mines Tbk dan entitas             consolidated financial statements of PT Golden Energy
    anaknya terlampir, yang terdiri dari laporan posisi        Mines Tbk and its subsidiaries, which comprise the
    keuangan        konsolidasian      interim     tang gal    interim consolidated statement of financial position as of
    31 March 2025, serta laporan laba rugi dan                 March 31, 2025, and the interim consolidated statement
    penghasilan komprehensif lain konsolidasian interim,       of profit or loss and other comprehensive income,
    laporan perubahan ekuitas konsolidasian interim, dan       interim consolidated statement of changes in equity, and
    laporan arus kas konsolidasian interim untuk periode       interim consolidated statement of cash flows for the
    tiga bulan yang berakhir pada tanggal tersebut, serta      three-month period then ended, and notes to the interim
    catatan atas laporan keuangan konsolidasian interim,       consolidated financial statements, including material
    termasuk informasi kebijakan akuntansi material.           accounting policy information. Management is
    Manajemen bertanggungjawab atas penyusunan dan             responsible for the preparation and fair presentation of
    penyajian wajar laporan keuangan konsolidasian             these interim consolidated financial statements in
    interim ini berdasarkan Standar Akuntansi Keuangan         accordance with Indonesian Financial Accounting
    di Indonesia. Tanggungjawab kami adalah untuk              Standards. Our responsibility is to express a conclusion
    menyatakan suatu kesimpulan atas laporan keuangan          on these interim consolidated financial statements
    konsolidasian interim ini berdasarkan reviu kami.          based on our review.

    Ruang Lingkup Reviu                                        Scope of Review

    Kami melaksanakan reviu kami sesuai dengan                 We conducted our review in accordance with Standard
    Standar Perikatan Reviu 2410, "Reviu atas lnformasi        on Review Engagements 2410, "Review of Interim
    Keuangan Interim yang Dilaksanakan oleh Auditor            Financial Information Performed by the Independent
    lndependen Entitas" yang ditetapkan oleh lnstitut          Auditor of the Entity" established by the Indonesian
    Akuntan Publik Indonesia. Suatu reviu atas laporan         Institute of Certified Public Accountants. A review of
    keuangan interim terdiri dari permintaan keterangan,       interim financial statements consists of making inquiries ,
    terutama kepada pihak yang bertanggungjawab atas           primarily of persons responsible for financial and
    bidang keuangan dan akuntansi, serta penerapan             accounting matters, and applying analytical and other
    prosedur analitis dan prosedur reviu lainnya. Suatu        review procedures. A review is substantially less in
    reviu memiliki ruang lingkup yang secara substansial       scope than an audit conducted in accordance with
    kurang daripada suatu audit yang dilaksanakan sesuai       Standards on Auditing established by the Indonesian
    dengan Standar Audit yang ditetapkan oleh lnstitut         Institute of Certified Public Accountants and
    Akuntan        Publik    Indonesia      dan     sebagai    consequently, does not enable us to obtain assurance
    konsekuensinya, tidak memungkinkan kami untuk              that we would become aware of all significant matters
    memperoleh keyakinan bahwa kami akan mengetahui            that might be identified in an audit. Accordingly, we do
    seluruh hal signifikan yang mungkin dapat                  not express an audit opinion .
    teridentifikasi dalam suatu audit. Oleh karena itu, kami
    tidak menyatakan suatu opini audit.




                                                                                               An independent member of
                                                                                            Moore Global Network Limited -
                                                                            members in principal cities throughout the world
Page 4
MIRAWATI SENSI IDRIS                                                                                                 MOORE

 Kesimpulan                                                         Conclusion

 Berdasarkan reviu kami, tidak terdapat hal yang                    Based on our review, nothing has come to our attention
 menjadi perhatian kami yang menyebabkan kami                       that causes us to believe that the interim consolidated
 percaya bahwa laporan keuangan konsolidasian interim               financial statements do not present fairly, in all material
 terlampir tidak menyajikan secara wajar, dalam semua               respects, the interim consolidated financial position of
 hal yang material, posisi keuangan konsolidasian                   PT Golden Energy Mines Tbk and its subsidiaries as of
 interim PT Golden Energy Mines Tbk dan entitas                     March 31, 2025 and their interim consolidated financial
 anaknya tanggal 31 March 2025, serta kinerja                       performance and cash flows for the three-month period
 keuangan dan arus kas konsolidasian interimnya untuk               then ended, in accordance with Indonesian Financial
 periode tiga bulan yang berakhir pada tanggal tersebut,            Accounting Standards.
 sesuai dengan Standar Akuntansi Keuangan di
 Indonesia.


 MIRAWATI SENSI IDRIS




Maria Leckzinska
lzin Akuntan Publik No. AP.0155/
Certified Public Accountant License No. AP.0155

23 Mei 2025/May 23, 2025




                                                           - ii -
Page 5

          
Page 6

          
Page 7
PT GOLDEN ENERGY MINES Tbk DAN ENTITAS ANAK                                                            PT GOLDEN ENERGY MINES Tbk AND ITS SUBSIDIARIES
Laporan Posisi Keuangan Konsolidasian Interim                                                             Interim Consolidated Statements of Financial Position
31 Maret 2025 dan 31 Desember 2024                                                                                       March 31, 2025 and December 31, 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat, kecuali Dinyatakan Lain)            (Figures are Presented in United States Dollar, unless Otherwise Stated)



                                                        31 Maret 2025/
                                                        March 31, 2025
                                                        (Tidak Diaudit/      Catatan/   31 Desember 2024/
                                                          Unaudited )         Notes     December 31, 2024


ASET                                                                                                               ASSETS

ASET LANCAR                                                                                                        CURRENT ASSETS
Kas dan setara kas                                          335.305.520        4              326.929.041          Cash and cash equivalents
Piutang usaha                                                                  6                                   Trade receivables
   Pihak berelasi                                            12.031.064        35              10.827.962             Related parties
   Pihak ketiga                                             208.888.921                       191.864.080             Third parties
Piutang lain-lain - pihak ketiga                                131.386                           134.483          Other receivables - third parties
Persediaan                                                   36.330.613        7               23.133.833          Inventories
Pajak dibayar di muka                                       107.348.712        33             121.349.752          Prepaid taxes
Uang muka dan biaya dibayar di muka                          50.925.740        8               31.822.911          Advances and prepaid expenses

Jumlah Aset Lancar                                          750.961.956                       706.062.062          Total Current Assets

ASET TIDAK LANCAR                                                                                                  NON-CURRENT ASSETS
Piutang lain-lain - pihak ketiga                                 523.186                          536.976          Other receivables - third parties
Dana yang dibatasi pencairannya                               31.116.977       5               24.660.166          Restricted funds
Aset pajak tangguhan                                           6.677.964       33               6.417.420          Deferred tax assets
Aset tetap - setelah dikurangi akumulasi                                                                           Property and equipment - net of accumulated
   penyusutan sebesar US$ 93.209.516                                                                                  depreciation of US$ 93,209,516
   dan US$ 90.522.677 masing-masing                                                                                   and US$ 90,522,677 as of March 31, 2025
   pada tanggal 31 Maret 2025 dan                                                                                      and December 31, 2024,
   31 Desember 2024                                         110.405.060        9              109.889.241             respectively
Aset hak guna - bersih                                        2.283.625        17               2.235.227          Right-of-use assets - net
Aset eksplorasi dan evaluasi                                    439.642        10                 451.230          Exploration and evaluation assets
Aset pertambangan - setelah dikurangi akumulasi                                                                    Mine properties - net of accumulated amortization
   amortisasi sebesar US$ 189.880.015 dan                                                                             of US$ 189,880,015 and US$ 186,495,328
   US$ 186.495.328 masing-masing pada tanggal                                                                          as of March 31, 2025 and December 31, 2024,
   31 Maret 2025 dan 31 Desember 2024 dan                                                                             respectively, and accumulated
   akumulasi kerugian penurunan nilai sebesar                                                                         impairment losses of US$ 7,835,487
   US$ 7.835.487 pada tanggal 31 Maret 2025                                                                           as of March 31, 2025 and December 31, 2024,
   dan 31 Desember 2024                                     306.094.581        11             308.953.540             respectively
Goodwill - bersih                                            17.206.169        32              17.206.169          Goodwill - net
Aset takberwujud - piranti lunak - bersih                        12.265        12                  17.090          Intangible asset - software - net
Aset tidak lancar lainnya                                    63.859.288        13              63.142.766          Other non-current assets

Jumlah Aset Tidak Lancar                                    538.618.757                       533.509.825          Total Non-current Assets

JUMLAH ASET                                                1.289.580.713                    1.239.571.887          TOTAL ASSETS




Lihat catatan atas laporan keuangan konsolidasian interim yang merupakan                  See accompanying notes to interim consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim.                which are an integral part of the interim consolidated financial statements.



                                                                               -1-
Page 8
PT GOLDEN ENERGY MINES Tbk DAN ENTITAS ANAK                                                           PT GOLDEN ENERGY MINES Tbk AND ITS SUBSIDIARIES
Laporan Posisi Keuangan Konsolidasian Interim                                                             Interim Consolidated Statements of Financial Position
31 Maret 2025 dan 31 Desember 2024                                                                                       March 31, 2025 and December 31, 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat, kecuali Dinyatakan Lain)            (Figures are Presented in United States Dollar, unless Otherwise Stated)



                                                        31 Maret 2025/
                                                        March 31, 2025
                                                        (Tidak Diaudit/      Catatan/   31 Desember 2024/
                                                          Unaudited )         Notes     December 31, 2024


LIABILITAS DAN EKUITAS                                                                                          LIABILITIES AND EQUITY

LIABILITAS                                                                                                      LIABILITIES

LIABILITAS JANGKA PENDEK                                                                                        CURRENT LIABILITIES
Utang bank jangka pendek                                    135.016.748        14             242.060.169       Short-term bank loans
Utang usaha                                                                    15                               Trade payables
  Pihak berelasi                                             56.714.311        35              55.633.959         Related parties
  Pihak ketiga                                              220.293.854                       192.359.669         Third parties
Utang lain-lain                                                                                                 Other payables
  Pihak berelasi                                                   8.721       35                   8.951         Related parties
  Pihak ketiga                                                   162.366                          380.545         Third parties
Utang pajak                                                   17.732.598       33               4.547.117       Taxes payable
Beban akrual                                                  19.251.476       16              16.345.798       Accrued expenses
Uang muka pelanggan - pihak ketiga                                 8.322                            8.541       Advances from customers - third parties
Utang jangka panjang yang akan jatuh tempo
  dalam waktu satu tahun                                                                                        Current portion of long-term liabilities
  Utang bank                                                  10.000.000       14              10.000.000         Bank loan
  Utang sewa                                                     221.494       17                 240.256         Lease liabilities

Jumlah Liabilitas Jangka Pendek                             459.409.890                       521.585.005       Total Current Liabilities

LIABILITAS JANGKA PANJANG                                                                                       NON-CURRENT LIABILITIES
Liabilitas imbalan kerja karyawan                              4.265.555       31               4.157.108       Employee benefits liability
Liabilitas pajak tangguhan                                    15.747.914       33              15.752.245       Deferred tax liabilities
Utang jangka panjang - setelah dikurangi bagian
   yang akan jatuh tempo dalam waktu satu tahun                                                                 Long-term liabilities - net of current portion
   Utang bank                                                 27.500.000       14              30.000.000         Bank loan
   Utang sewa                                                    306.491       17                 326.601         Lease liabilities
Provisi reklamasi dan penutupan tambang                        6.621.864       19               6.530.229       Provision for reclamation and mine closure
Liabilitas jangka panjang lainnya                                 90.426                           92.810       Other non-current liabilities

Jumlah Liabilitas Jangka Panjang                              54.532.250                       56.858.993       Total Non-current Liabilities

JUMLAH LIABILITAS                                           513.942.140                       578.443.998       TOTAL LIABILITIES

EKUITAS                                                                                                         EQUITY

Ekuitas yang dapat diatribusikan                                                                                Equity attributable to Owners
  kepada Pemilik Entitas Induk                                                                                     of the Parent Company
Modal saham - nilai nominal Rp 100 per saham                                                                    Capital stock - Rp 100 par value per share
  Modal dasar - 20.000.000.000 saham                                                                               Authorized - 20,000,000,000 shares
  Modal ditempatkan dan disetor penuh -                                                                            Issued and fully paid -
      5.882.353.000 saham                                    65.065.961        20              65.065.961             5,882,353,000 shares
Tambahan modal disetor - neto                               229.019.198        21             229.019.198       Additional paid-in capital - net
Selisih nilai transaksi dengan                                                                                  Difference arising from transactions
  kepentingan nonpengendali                                    1.228.954       23               1.228.954          with non-controlling interests
Saldo laba                                                                                                      Retained earnings
  Dicadangkan                                                 7.516.287        22               7.516.287          Appropriated
  Belum dicadangkan                                         540.450.115                       427.408.734          Unappropriated
Komponen ekuitas lainnya                                    (77.649.688)                      (78.080.120)      Other equity component
Jumlah                                                      765.630.827                       652.159.014       Total
Kepentingan nonpengendali                                    10.007.746        24               8.968.875       Non-controlling interests

JUMLAH EKUITAS                                              775.638.573                       661.127.889       TOTAL EQUITY

JUMLAH LIABILITAS DAN EKUITAS                              1.289.580.713                    1.239.571.887       LIABILITIES AND EQUITY




Lihat catatan atas laporan keuangan konsolidasian interim yang merupakan                 See accompanying notes to interim consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim.               which are an integral part of the interim consolidated financial statements.


                                                                               -2-
Page 9
PT GOLDEN ENERGY MINES Tbk DAN ENTITAS ANAK                                                                         PT GOLDEN ENERGY MINES Tbk AND ITS SUBSIDIARIES
Laporan Laba Rugi                                                                                                           Interim Consolidated Statements of Profit or Loss
dan Penghasilan Komprehensif Lain Konsolidasian Interim                                                                                     and Other Comprehensive Income
Untuk Periode-periode Tiga Bulan yang Berakhir 31 Maret 2025 dan 2024                                            For the Three-Month Periods Ended March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat, kecuali Dinyatakan Lain)                          (Figures are Presented in United States Dollar, unless Otherwise Stated)



                                                          (Tidak Diaudit/                 (Tidak Diaudit/
                                                            Unaudited )      Catatan/       Unaudited )
                                                               2024           Notes            2023


PENDAPATAN USAHA                                             648.339.139       25           715.641.070       REVENUES

BEBAN POKOK PENJUALAN                                        398.849.148       26           378.293.895       COST OF REVENUES

LABA KOTOR                                                   249.489.991                    337.347.175       GROSS PROFIT

BEBAN USAHA                                                                                                   OPERATING EXPENSES
Beban penjualan                                               69.758.810       27             80.000.010      Selling expenses
Beban umum dan administrasi                                   34.211.173       28             31.352.074      General and administrative expenses
Beban eksplorasi                                                 670.248                         118.236      Exploration costs

Jumlah Beban Usaha                                           104.640.231                    111.470.320       Total Operating Expenses

LABA USAHA                                                   144.849.760                    225.876.855       OPERATING PROFIT

PENGHASILAN (BEBAN) LAIN-LAIN                                                                                 OTHER INCOME (EXPENSES)
Pendapatan bunga                                                2.194.310                      2.185.929      Interest income
Beban keuangan lainnya                                         (1.148.000)     29             (1.327.128)     Other financial charges
Keuntungan selisih kurs
  mata uang asing - bersih                                      2.599.451                      1.753.560      Gain on foreign exchange - net
Beban bunga                                                    (1.435.245)                    (2.030.513)     Interest expense
Lain-lain - bersih                                               (238.332)     30                 45.412      Others - net

Beban Lain-lain - Bersih                                       1.972.184                         627.260      Other Expenses - Net

LABA SEBELUM PAJAK                                           146.821.944                    226.504.115       PROFIT BEFORE TAX

BEBAN (PENGHASILAN) PAJAK                                                      33                             TAX EXPENSE (BENEFIT)
Kini                                                          32.822.432                      51.337.106      Current
Tangguhan                                                       (266.777)                         33.576      Deferred

Beban Pajak - Bersih                                          32.555.655                      51.370.682      Tax Expense - Net

LABA TAHUN BERJALAN                                          114.266.289                    175.133.433       PROFIT FOR THE YEAR

PENGHASILAN (RUGI) KOMPREHENSIF LAIN                                                                          OTHER COMPREHENSIVE INCOME (LOSS)
                                                                                                              Items that will be reclassified subsequently to profit and loss -
Pos yang akan direklasifikasi ke laba rugi                                                                       Foreign exchange differences arising from
  Selisih kurs penjabaran laporan keuangan                       244.395                        (741.651)          financial statements translation
JUMLAH PENGHASILAN KOMPREHENSIF                                                                               TOTAL COMPREHENSIVE INCOME
  TAHUN BERJALAN                                             114.510.684                    174.391.782         FOR THE YEAR

Laba tahun berjalan yang teratribusikan pada:                                                                 Profit for the year attributable to:
  Pemilik entitas induk                                      113.041.381                    171.718.367         Owners of the Parent Company
  Kepentingan nonpengendali                                    1.224.908       24             3.415.066         Non-controlling interests
                                                             114.266.289                    175.133.433

Penghasilan komprehensif yang
  teratribusikan kepada:                                                                                      Comprehensive income attributable to:
  Pemilik entitas induk                                      113.471.813                    172.006.553         Owners of the Parent Company
  Kepentingan nonpengendali                                    1.038.871                      2.385.229         Non-controlling interests
                                                             114.510.684                    174.391.782

LABA BERSIH PER SAHAM DASAR DIATRIBUSIKAN                                                                     EARNINGS PER SHARE ATTRIBUTABLE
  KEPADA PEMILIK ENTITAS INDUK                                      0,019      34                  0,029        TO OWNERS OF THE PARENT COMPANY




Lihat catatan atas laporan keuangan konsolidasian interim yang merupakan                           See accompanying notes to interim consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim.                         which are an integral part of the interim consolidated financial statements.



                                                                                    -3-
Page 10
PT GOLDEN ENERGY MINES Tbk DAN ENTITAS ANAK                                                                                                                                                                                                                     PT GOLDEN ENERGY MINES Tbk AND ITS SUBSIDIARIES
Laporan Perubahan Ekuitas Konsolidasian Interim                                                                                                                                                                                                                      Interim Consolidated Statements of Changes in Equity
Untuk Periode-periode Tiga Bulan yang Berakhir 31 Maret 2025 dan 2024                                                                                                                                                                                         For the Three-Month Periods Ended March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat, kecuali Dinyatakan Lain)                                                                                                                                                                       (Figures are Presented in United States Dollar, unless Otherwise Stated)


                                                                                                                                                                                                                     `
                                                                                      Ekuitas yang Dapat Diatribusikan Kepada Pemilik Entitas Induk/Equity Attributable to the Owners of the Parent Company
                                                                                                         Selisih
                                                                                                           Nilai                 Komponen Ekuitas Lainnya/
                                                                                                        Transaksi                  Other Equity Component
                                                                                                         dengan             Selisih Kurs
                                                                                                      Kepentingan            Penjabaran
                                                                                                     Nonpengendali/           Laporan
                                                            Modal Saham            Tambahan            Difference            Keuangan/
                                                            Ditempatkan              Modal          in Value arising     Foreign Exchange
                                                            dan Disetor/         Disetor- Bersih/         from              Differences                                        Saldo Laba/Retained Earnings                      Kepentingan
                                                             Issued and            Additional      Transactions with        Arising from                                   Telah Ditentukan    Belum Ditentukan                 Nonpengendali/
                                                               Paid Up               Paid-in         Non-controlling    Financial Statements    Keuntungan Aktuarial/      Penggunaannya/       Penggunaannya/    Jumlah/       Non-controlling      Jumlah Ekuitas/
                                                            Capital Stock         Capital - Net         Interests           Translation             Actuarial Gain           Appropriated       Unappropriated     Total          Interests            Total Equity


Saldo pada tanggal 1 Januari 2024                              65.065.961           229.019.198            1.228.954              (77.680.438)                 (2.069)          6.516.287          429.602.520    653.750.413         9.361.674          663.112.087        Balance as of January 1, 2023

Penghasilan (rugi) komprehensif:                                                                                                                                                                                                                                            Comprehensive income (loss):

Laba periode berjalan                                                        -                -                     -                       -                       -                   -          171.718.367    171.718.367         3.415.066          175.133.433        Profit for the period

Penghasilan (rugi) komprehensif lain                                         -                -                     -                288.186                        -                   -                    -       288.186         (1.029.837)             (741.651)      Other comprehensive income (loss)

Jumlah penghasilan komprehensif                                              -                -                     -                288.186                        -                   -          171.718.367    172.006.553         2.385.229          174.391.782        Total comprehensive income

Saldo pada tanggal 31 Maret 2024 (Tidak Diaudit)               65.065.961           229.019.198            1.228.954              (77.392.252)                 (2.069)          6.516.287          601.320.887    825.756.966        11.746.903          837.503.869        Balance as of March 31, 2024 (Unaudited)



Saldo pada tanggal 1 Januari 2025                              65.065.961           229.019.198            1.228.954              (78.268.862)               188.742            7.516.287          427.408.734    652.159.014         8.968.875          661.127.889        Balance as of January 1, 2025

Penghasilan (rugi) komprehensif:                                                                                                                                                                                                                                            Comprehensive income (loss):

Laba periode berjalan                                                        -                -                     -                       -                       -                   -          113.041.381    113.041.381         1.224.908          114.266.289        Profit for the period

Penghasilan (rugi) komprehensif lain                                         -                -                     -                430.432                        -                   -                    -       430.432           (186.037)              244.395       Other comprehensive income (loss)

Jumlah penghasilan komprehensif                                              -                -                     -                430.432                        -                   -          113.041.381    113.471.813         1.038.871          114.510.684        Total comprehensive income

Saldo pada tanggal 31 Maret 2025 (Tidak Diaudit)               65.065.961           229.019.198            1.228.954              (77.838.430)               188.742            7.516.287          540.450.115    765.630.827        10.007.746          775.638.573        Balance as of March 31, 2025 (Unaudited)




Lihat catatan atas laporan keuangan konsolidasian interim yang merupakan                                                                                                                                                                           See accompanying notes to interim consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim.                                                                                                                                                                         which are an integral part of the interim consolidated financial statements.



                                                                                                                                                                        -4-
Page 11
PT GOLDEN ENERGY MINES Tbk DAN ENTITAS ANAK                                                                       PT GOLDEN ENERGY MINES Tbk AND ITS SUBSIDIARIES
Laporan Arus Kas Konsolidasian Interim                                                                                      Interim Consolidated Statements of Cash Flows
Untuk Periode-periode Tiga Bulan yang Berakhir 31 Maret 2025 dan 2024                                          For the Three-Month Periods Ended March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat, kecuali Dinyatakan Lain)                        (Figures are Presented in United States Dollar, unless Otherwise Stated)



                                                                      (Tidak Diaudit/Unaudited )
                                                                    2025                     2024

ARUS KAS DARI AKTIVITAS OPERASI                                                                                  CASH FLOWS FROM OPERATING ACTIVITIES
Penerimaan dari pelanggan                                           630.110.976              742.421.945         Cash receipts from customers
Penerimaan pendapatan keuangan                                        2.208.100                2.215.780         Receipts of finance income
Pembayaran beban keuangan dan biaya keuangan lainnya                 (2.261.987)              (2.218.033)        Payments of finance costs and other financial charges
Pembayaran kepada karyawan                                           (9.656.086)              (9.729.179)        Cash paid to employees
Pembayaran iuran dana hasil produksi batubara dan
  deadrent kepada pemerintah                                        (91.695.168)             (89.441.572)        Royalty fees and deadrent paid to government
Pembayaran kepada kontraktor, pemasok dan lainnya                  (361.249.365)            (461.573.201)        Cash paid to contractors, suppliers and others

Kas diperoleh dari operasi                                          167.456.470              181.675.740         Net cash generated from operations
Pembayaran pajak penghasilan badan                                  (38.103.422)             (42.834.770)        Payments of corporate income tax

Kas Bersih Diperoleh dari Aktivitas Operasi                         129.353.048              138.840.970         Net Cash Provided by Operating Activities

ARUS KAS DARI AKTIVITAS INVESTASI                                                                                CASH FLOWS FROM INVESTING ACTIVITIES
Pembayaran uang muka ganti rugi lahan                                   (593.896)                      -         Payments of advances for land compensations
Kenaikan dana yang dibatasi pencairannya                              (6.535.765)             (6.412.722)        Increase in restricted fund
Perolehan aset tetap                                                  (3.248.245)             (3.225.381)        Acquisitions of property and equipment
Penambahan aset pertambangan                                            (834.848)                      -         Addition in mine properties

Kas Bersih Digunakan untuk Aktivitas Investasi                       (11.212.754)             (9.638.103)        Net Cash Used in Investing Activities

ARUS KAS DARI AKTIVITAS PENDANAAN                                                                                CASH FLOWS FROM FINANCING ACTIVITIES
Utang bank jangka pendek                                                                                         Short-term bank loans
  Penerimaan                                                        331.141.845              177.123.092           Proceeds
  Pembayaran                                                       (439.016.867)            (318.900.388)          Payments
Utang bank jangka panjang                                                                                        Long-term bank loans
  Penerimaan                                                                   -              50.000.000           Proceeds
  Pembayaran                                                          (2.500.000)             (2.500.000)          Payments

Kas Bersih Digunakan untuk Aktivitas Pendanaan                     (110.375.022)             (94.277.296)        Net Cash Used in Financing Activities

KENAIKAN BERSIH KAS DAN SETARA KAS                                     7.765.272              34.925.571         NET INCREASE IN CASH AND CASH EQUIVALENTS

                                                                                                                 CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AWAL PERIODE                                     326.929.041              318.495.046            AT THE BEGINNING OF THE PERIOD
Pengaruh perubahan kurs mata uang asing                                 611.207               (2.541.697)        Effect of foreign exchange rate changes

                                                                                                                 CASH AND CASH EQUIVALENTS
KAS DAN SETARA KAS AKHIR PERIODE                                    335.305.520              350.878.920           AT THE END OF THE PERIOD




Lihat catatan atas laporan keuangan konsolidasian interim yang merupakan                                See accompanying notes to interim consolidated financial statements
bagian yang tidak terpisahkan dari laporan keuangan konsolidasian interim.                              which are an integral part of the interim consolidated financial statements


                                                                                      -5-
Page 12
PT GOLDEN ENERGY MINES Tbk                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                        unless Otherwise Stated)


1.   Umum                                                        1.    General

     a.   Pendirian dan Informasi Umum                                 a.   Establishment and General Information

          PT Golden Energy Mines Tbk (Perusahaan)                           PT Golden Energy Mines Tbk. (the Company)
          didirikan dengan nama PT Bumi Kencana Eka                         was established under the name of PT Bumi
          Sakti berdasarkan Akta No. 81 tanggal                             Kencana Eka Sakti based on Notarial Deed
          13 Maret 1997 yang dibuat dihadapan                               No. 81 dated March 13, 1997 of Imam
          Imam Santoso, S.H., notaris di Jakarta.                           Santoso, S.H., a public notary in Jakarta.
          Akta Pendirian telah disahkan oleh Menteri                        The Deed of Establishment was approved by
          Kehakiman Republik Indonesia (sekarang                            the Minister of Justice of the Republic
          Menteri Hukum dan Hak Asasi Manusia                               of Indonesia (currently the Minister of
          Republik Indonesia) dalam Surat Keputusan                         Law and Human Rights of the Republic of
          No. C2-7.922HT.01.01.TH.98 tanggal 30 Juni                        Indonesia)      in   his   Decision    Letter
          1998 serta telah diumumkan dalam Berita                           No. C2-7.922HT.01.01.TH.98 dated June 30,
          Negara Republik Indonesia No. 30 tanggal                          1998 and was published in the State Gazette of
          12 April 2002, Tambahan No. 3667.                                 the Republic of Indonesia No. 30 dated
                                                                            April 12, 2002, Supplement No. 3667.

          Anggaran Dasar Perusahaan telah mengalami                         The Company’s Articles of Association have
          beberapa kali perubahan, terakhir diubah                          been amended several times, the latest
          dengan Akta No. 130 tanggal 16 Mei 2024 dari                      amendment by Notarial Deed No. 130 dated
          Hannywati Gunawan, S.H., notaris di Jakarta,                      May 16, 2024 of Hannywati Gunawan, S.H.,
          mengenai penyesuaian pasal 3 Anggaran Dasar                       notary in Jakarta, regarding adjustments to
          Perseroan perihal Maksud dan Tujuan                               article 3 of the Company's Articles of
          Perseroan yang disesuaikan dengan Klasifikasi                     Association   regarding    the    Company's
          Baku Lapangan Usaha Indonesia (KBLI)                              Aims - Business and Objectives which are
          tahun 2020. Perubahan tersebut telah                              adjusted to the Standard Classification of
          disetujui   oleh    Menteri   Hukum      dan                      Indonesian Business Fields (KBLI) Year 2020.
          Hak Asasi Manusia Republik Indonesia                              These changes have been approved by the
          dalam             Surat          Keputusan                        Minister of Law and Human Rights of the
          No.     AHU-0028984.AH.01.02.Tahun     2024                       Republic of Indonesia in its Decision Letter
          tanggal 17 Mei 2024.                                              No. AHU-0028984.AH.01.02 Year 2024 dated
                                                                            May 17, 2024.

          Saat ini Perusahaan bergerak dalam bidang                         Currently, the Company is engaged in coal
          pertambangan melalui penyertaan pada entitas                      mining through its subsidiaries and in coal
          anaknya     dan    perdagangan      batubara.                     trading activities. The Company started its
          Perusahaan memulai kegiatan komersialnya                          commercial operations on April 30, 2010. On
          pada tanggal 30 April 2010. Pada tanggal                          February 4, 2011, based on the Decision of the
          4 Februari 2011, berdasarkan Keputusan                            Minister of Energy and Mineral Resources
          Kementerian Energi dan Sumber Daya                                No. 206.K./30/DJB/2011, the Company
          Mineral No. 206.K./30/DJB/2011, Perusahaan                        obtained License of Special Mining Operation
          memperoleh Izin Usaha Pertambangan (IUP)                          Production for Transportation and Trade of Coal
          Operasi Produksi Khusus untuk Pengangkutan                        which is valid for 3 years and based on the
          dan Penjualan Batubara untuk jangka waktu                         Decision of the Minister of Energy and Mineral
          3 tahun dan berdasarkan Keputusan                                 Resources No. 358.K/30/DJB/2014 dated
          Kementerian Energi dan Sumber Daya Mineral                        April 7, 2014, the period has been extended for
          No. 358.K/30/DJB/2014 tertanggal 7 April 2014,                    another 3 years.
          jangka waktu tersebut diperpanjang selama
          3 tahun.




                                                           -6-
Page 13
PT GOLDEN ENERGY MINES Tbk                                                      PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim           Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                      As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                               and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                          March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                unless Otherwise Stated)


        Berdasarkan Peraturan Menteri Energi dan                    Based on Regulation of the Minister of Energy
        Sumber Daya Mineral No. 34 tahun 2017,                      and Mineral Resources No. 34 year 2017, the
        Perusahaan telah melakukan penyesuaian                      Company obtained adjustment for License of
        Izin Usaha Pertambangan Operasi Khusus                      Special Mining Operation Production for
        Untuk Pengangkutan dan Penjualan Batubara                   Transportation and Trade of Coal with Register
        dengan mendapatkan Tanda Registrasi                         Certificate of Activities for Transportation and
        Kegiatan Pengangkutan dan Penjualan                         Trade of Coal No. 08392-00/TR-AJ/DBB/2017.
        No. 08392-00/TR-AJ/DBB/2017.

        Berdasarkan Keputusan Menteri Energi dan                    Based on the Decision of the Minister of Energy
        Sumber      Daya   Mineral   dan     Menteri                and Mineral Resources and the Minister of
        Investasi/Kepala     Badan        Koordinasi                Investment/Head       of    the     Investment
        Penanaman Modal No. 81202191527980003                       Coordinating Board No. 81202191527980003
        tanggal 31 Juli 2023, Perusahaan telah                      dated July 31, 2023, the Company has obtained
        mendapatkan Perizinan Berusaha Berbasis                     a Risk based Business License for
        Risiko untuk Pengangkutan dan Penjualan                     Transportation and Trade of Coal with a period
        Batubara dengan jangka waktu 5 tahun sejak                  of 5 years since the Decree was approved and
        ditetapkan Keputusan dan dapat diperpanjang                 can be extended in accordance with statutory
        sesuai     dengan    ketentuan     peraturan                provisions.
        perundang-undangan.

        Perusahaan berkedudukan di Sinar Mas Land                   The Company’s main office is located at Sinar
        Plaza, Menara II, Lantai 6, Jl. M.H. Thamrin                Mas Land Plaza, Tower II, 6th Floor, Jl. M.H.
        Kav. 51, Jakarta 10350.                                     Thamrin Kav. 51, Jakarta 10350.

        Perusahaan tergabung dalam kelompok usaha                   The Company operates under the Sinarmas
        Sinarmas.                                                   group of businesses.

        Entitas induk langsung Perusahaan adalah                    The direct parent entity of the Company is
        PT Dian Swastatika Sentosa Tbk dan                          PT Dian Swastatika Sentosa Tbk and the
        pemegang saham pengendali Perusahaan                        ultimate controlling shareholders of the
        adalah Franky Oesman Widjaja dan Indra                      Company are Franky Oesman Widjaja and
        Widjaja.                                                    Indra Widjaja.

        Dalam laporan keuangan konsolidasian interim,               In the interim consolidated financial statements,
        Perusahaan dan entitas anaknya Bersama-                     the Company and its subsidiaries are
        sama disebut sebagai “Grup”.                                collectively referred to as “the Group”.

   b.   Penawaran Umum Efek Perusahaan                         b.   Public Offering of Shares

        Pada tanggal 9 November 2011, Perusahaan                    On November 9, 2011, the Company obtained
        memperoleh Pernyataan Efektif dari Ketua                    the Notice of Effectivity from the Chairman of
        Badan Pengawas Pasar Modal dan Lembaga                      the Capital Market and Financial Institutions
        Keuangan (Bapepam-LK) dengan Surat                          Supervisory Agency (Bapepam-LK) in Letter
        No. S-12171/BL/2011 untuk melakukan                         No. S-12171/BL/2011 for its offering to the
        penawaran umum saham perdana sebanyak                       public     of    882,353,000     shares.   On
        882.353.000       saham.     Pada     tanggal               November 17, 2011, all of these shares were
        17 November 2011, seluruh saham tersebut                    listed on the Indonesia Stock Exchange.
        telah dicatatkan pada Bursa Efek Indonesia.

        Pada tanggal 31 Maret 2025 dan 31 Desember                  As of March 31, 2025 and December 31, 2024,
        2024, seluruh saham Perusahaan sejumlah                     all of the Company’s shares totaling
        5.882.353.000 saham telah tercatat di Bursa                 5,882,353,000 shares are listed on the
        Efek Indonesia.                                             Indonesia Stock Exchange.




                                                        -7-
Page 14
PT GOLDEN ENERGY MINES Tbk                                                                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                                  unless Otherwise Stated)


   c.   Entitas Anak yang Dikonsolidasikan                                                                           c.    Consolidated Subsidiaries

        Entitas-entitas   anak   yang    dikendalikan                                                                      The subsidiaries, controlled, either directly or
        Perusahaan, baik secara langsung maupun                                                                            indirectly, by the Company, are as follows:
        tidak langsung, adalah sebagai berikut:
                                                                                                                                                    Persentase Kepemilikan Efektif
                                                                                                                                                           dan Hak Suara/                    Jumlah Aset
                                                                                                                                    Tahun Awal         Effective Percentage of           (Sebelum Eliminasi)/
                                                                                                                                 Operasi Komersial/    Ownership Interest and                Total Assets
                                                                                                                                      Year of               Voting Rights                (Before Elimination)
                                                                                                                                      Start of        31 Maret/       31 Desember/   31 Maret/         31 Desember/
                                                                    Domisili/                       Jenis Usaha/                   Commercial        March 31,       December 31,    March 31,         December 31,
                       Entitas Anak/Subsidiaries                    Domicile                     Nature of Business                  Operation          2025              2024         2025                2024
                                                                                                                                                         %                 %
        Pemilikan Langsung/Direct Ownership:
        PT Roundhill Capital Indonesia (RCI)                 Jakarta Pusat/            Penyertaan saham dan                            2014             99,0158           99,0158    853.979.781        790.237.063
                                                             Central Jakarta           perdagangan besar/
                                                                                       Holding company and trading

        PT Kuansing Inti Makmur (KIM)                        Muara Bungo,              Pertambangan batubara/                          2005             99,9998           99,9998      87.857.148        97.869.039
                                                             Kabupaten Bungo,          Coal mining
                                                             Jambi

        PT Trisula Kencana Sakti (TKS)                       Barito Utara,             Pertambangan batubara/                          2008             99,9998           99,9998       3.561.458         7.811.492
                                                             Kabupaten Barito Utara,   Coal mining
                                                             Kalimantan Tengah/
                                                             Central Borneo

        GEMS Trading                                         Singapura/Singapore       Perdagangan besar/                              2012            100,0000          100,0000       9.706.585         9.675.768
          Resources Pte. Ltd. (GEMSTR)                                                 Trading

        PT Karya Mining Solution (KMS)                       Jakarta Pusat/            Jasa Pertambangan/                                -              99,9999           99,9999      21.079.618        19.370.783
           (dahulu/formerly PT Bumi Anugerah Semesta (BAS)   Central Jakarta           Mining Services

        PT GEMS Energy Indonesia (GEMS Energy)               Jakarta Pusat/            Perdagangan besar/                                -              99,9902           99,9902        122.518            125.698
                                                             Central Jakarta           Trading

        PT Era Mitra Selaras (EMS)                           Jakarta Pusat/            Penyertaan saham/                                 -             100,0000          100,0000        936.990            980.893
                                                             Central Jakarta           Holding company

        PT Unsoco (Unsoco)                                   Jakarta Pusat/            Jasa konsultasi manajemen/                        -              99,9999           99,9999         71.116             73.100
                                                             Central Jakarta           Management consultant services

        PT Dwikarya Sejati Utama (DSU)                       Jakarta Pusat/            Modal ventura dan manajemen konsultasi/           -             100,0000          100,0000    124.703.621        132.659.934
                                                             Central Jakarta           Venture capital and management
                                                                                       consultant

        Pemilikan Tidak Langsung/Indirect Ownership:
        PT Borneo Indobara (BORNEO)                          Jakarta Pusat/            Pertambangan batubara/Coal mining               2005             98,0951           98,0951    851.760.114        788.431.146
           (melalui/through RCI)                             Central Jakarta

        PT Karya Cemerlang Persada (KCP)                     Muara Bungo,              Pertambangan batubara/Coal mining               2011             99,9998           99,9998       7.579.187         7.742.554
           (melalui/through KIM)                             Kabupaten Bungo,
                                                             Jambi

        PT Bungo Bara Utama (BBU)                            Muara Bungo,              Pertambangan batubara/Coal mining               2017             99,9998           99,9998      35.225.480        47.037.443
           (melalui/through KIM)                             Kabupaten Bungo,
                                                             Jambi

        PT Bara Harmonis Batang Asam                         Muara Bungo,              Pertambangan batubara/Coal mining               2010             99,9998           99,9998       1.504.849         1.541.499
           (BHBA) (melalui/through KIM)                      Kabupaten Bungo,
                                                             Jambi

        PT Berkat Nusantara Permai (BNP)                     Muara Bungo,              Pertambangan batubara/Coal mining                 -              99,9998           99,9998      19.937.177        19.964.443
           (melalui/through KIM)                             Kabupaten Bungo,
                                                             Jambi

        PT Tanjung Belit Bara Utama (TBBU)                   Muara Bungo,              Pertambangan batubara/Coal mining                 -              99,9998           99,9998      22.625.653        22.893.144
           (melalui/through KIM)                             Kabupaten Bungo,
                                                             Jambi

        PT Wahana Rimba Lestari (WRL)                        Jakarta Pusat/            Pertambangan batubara/Coal mining                 -             100,0000          100,0000        768.734            806.214
           (melalui/through EMS dan/and KIM)                 Central Jakarta

        PT Berkat Satria Abadi (BSA)                         Jakarta Pusat/            Pertambangan batubara/Coal mining                 -             100,0000          100,0000        166.528            172.133
           (melalui/through EMS dan/and KIM)                 Central Jakarta

        PT Kuansing Inti Sejahtera (KIS)                     Muara Bungo,              Pertambangan batubara/Coal mining                 -              99,9998           99,9998        361.312            373.053
           (melalui/through KIM)                             Kabupaten Bungo,
                                                             Jambi

        PT Bungo Bara Makmur (BBM)                           Muara Bungo,              Pertambangan batubara/Coal mining               2019             99,9998           99,9998      18.762.628        15.728.184
           (melalui/through BBU)                             Kabupaten Bungo,
                                                             Jambi

        PT Duta Sarana Internusa (DSI)                       Jakarta Pusat/            Jasa konsultasi manajemen/                        -             100,0000          100,0000    124.698.832        132.654.956
           (melalui/through DSU)                             Central Jakarta           Management consultant services

        PT Barasentosa Lestari (BSL)                         Jakarta Pusat/            Pertambangan batubara dan pengembangan          2015            100,0000          100,0000    124.634.622        132.590.047
           (melalui/through DSI dan/and UNSOCO)              Central Jakarta           pembangkit listrik mulut tambang/
                                                                                       Coal mining and developing a mine-mouth




                                                                                                -8-
Page 15
PT GOLDEN ENERGY MINES Tbk                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                  unless Otherwise Stated)


       DSU                                                           DSU

       Berdasarkan Akta No. 267, tanggal 31 Juli 2024                Based on Deed No. 267, dated July 31, 2024 of
       dari Hannywati Gunawan, S.H., notaris di                      Hannywati Gunawan, S.H., notary in Jakarta,
       Jakarta, para pemegang saham DSU                              the shareholders of DSU approved to increase
       menyetujui untuk meningkatkan modal dasar                     the       authorized         capital       from
       dari Rp 4.000.000.000 terdiri dari 4.000 saham                Rp 4,000,000,000 divided into 4,000 shares
       dengan nilai nominal Rp 1.000.000 menjadi                     with a par value of Rp 1,000,000 to
       Rp 110.000.000.000 terdiri dari 110.000 saham                 Rp 110,000,000,000 divided into 110,000
       dengan nilai nominal Rp 1.000.000, serta                      shares with a par value of Rp 1,000,000, as well
       meningkatkan modal ditempatkan dan Disetor                    as increasing the issued and paid-up capital
       dari Rp 1.000.000.000 terdiri dari 1.000 saham                from Rp 1,000,000,000 divided into 1,000
       dengan nilai nominal Rp 1.000.000 menjadi                     shares with a par value of Rp 1,000,000 to
       Rp 103.910.000.000 terdiri dari 103.910 saham                 Rp 103,910,000,000 divided into 103,910
       dengan     nilai   nominal     Rp     1.000.000.              shares with a par value of Rp 1,000,000.
       Peningkatan modal disetor tersebut seluruhnya                 The increase in paid-in capital was subscribed
       diambil bagian oleh Perusahaan. Akta tersebut                 by and issued to the Company. The deed
       telah disetujui oleh Menteri Hukum dan Hak                    was approved by the Ministry of Law
       Asasi     Manusia       Republik       Indonesia              and Human Rights of the Republic of
       dalam              Surat              Keputusan               Indonesia      in     its    Decision     Letter
       No.    AHU-0049832.AH.01.02.Tahun          2024               No. AHU-0049832.AH.01.02.Tahun 2024 dated
       tanggal 12 Agustus 2024 serta telah dicatat di                August 12, 2024 and was registered in the
       dalam database Sistem Administrasi Badan                      database Administration System of the Ministry
       Hukum dan Hak Asasi Manusia Republik                          of Law and Human Rights of the Republic of
       Indonesia              dalam               Surat              Indonesia                 in              Letter
       No.      AHU-AH.01.03-0181469            tanggal              No.       AHU-AH.01.03-0181469            dated
       12 Agustus 2024.                                              August 12, 2024.

       BSL                                                           BSL

       Berdasarkan Akta No. 266, tanggal 31 Juli 2024                Based on Deed No. 266, dated July 31, 2024 of
       dari Hannywati Gunawan, S.H., notaris di                      Hannywati Gunawan, S.H., notary in Jakarta,
       Jakarta, para pemegang saham BSL                              the shareholders of BSL approved to increase
       menyetujui untuk meningkatkan modal dasar                     the       authorized         capital       from
       dari Rp 3.500.000.000 terdiri dari 3.500 saham                Rp 3,500,000,000 divided into 3,500 shares
       dengan nilai nominal Rp 1.000.000 menjadi                     with a par value of Rp 1,000,000 to
       Rp 200.000.000.000 terdiri dari 200.000 saham                 Rp 200,000,000,000 divided into 200,000
       dengan nilai nominal Rp 1.000.000, serta                      shares with a par value of Rp 1,000,000, as well
       meningkatkan modal ditempatkan dan Disetor                    as increasing the issued and paid-up capital
       dari Rp 3.500.000.000 terdiri dari 3.500 saham                from Rp 3,500,000,000 divided into 3,500
       dengan nilai nominal Rp 1.000.000 menjadi                     shares with a par value of Rp 1,000,000 to
       Rp 174.371.000.000 terdiri dari 174.371 saham                 Rp 174,371,000,000 divided into 174,371
       dengan     nilai   nominal    Rp     1.000.000.               shares with a par value of Rp 1,000,000. The
       Peningkatan modal disetor tersebut diambil                    increase in paid-up capital subscribed by and
       secara proporsional oleh DSI, Perusahaan, dan                 issued proportionally by DSI, the Company,
       UNSOCO. Akta tersebut disetujui oleh Menteri                  and UNSOCO. The deed was approved by the
       Hukum dan Hak Asasi Manusia Republik                          Ministry of Law and Human Rights of the
       Indonesia      dalam      Surat      Keputusan                Republic of Indonesia in its Decision Letter
       No.    AHU-0049835.AH.01.02.Tahun         2024                No.    AHU-0049835.AH.01.02.Tahun          2024
       tanggal 12 Agustus 2024 serta telah dicatat di                dated August 12, 2024 and was registered
       dalam database Sistem Administrasi Badan                      in the database Administration System of
       Hukum dan Hak Asasi Manusia Republik                          the Ministry of Law and Human Rights of
       Indonesia              dalam              Surat               the Republic of Indonesia in Letter
       No.      AHU-AH.01.03-0181476           tanggal               No.       AHU-AH.01.03-0181476            dated
       12 Agustus 2024.                                              August 12, 2024.




                                                          -9-
Page 16
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


       EMS                                                              EMS

       Berdasarkan Akta No. 41, tanggal 20 Desember                     Based on Deed No. 41, dated December 20,
       2024 dari Deni Thanur, S.H., Notaris di Jakarta,                 2024 of Deni Thanur, S.H., a Notary in Jakarta,
       para pemegang saham EMS menyetujui untuk                         the shareholders of EMS approved to increase
       meningkatkan modal ditempatkan dan disetor                       the issued and paid-up capital from
       dari Rp 40.979.000.000 terdiri dari 40.979                       Rp 40,979,000,000 divided into 40,979 shares
       saham dengan nilai nominal Rp 1.000.000                          with a par value of Rp 1,000,000 to
       menjadi Rp 43.642.000.000 terdiri dari 43.642                    Rp 43,642,000,000 divided into 43,642 shares
       saham dengan nilai nominal Rp 1.000.000,                         with a par value of Rp 1,000,000, by issuing
       dengan menerbitkan 2.663 saham baru atau                         2,663 new shares or amounting to
       sebesar Rp 2.663.000.000 yang diambil                            Rp 2,663,000,000 which were all acquired by
       seluruhnya oleh Perusahaan. Akta tersebut                        the Company. The deed has been recorded in
       telah dicatat di dalam database Sistem                           the Database System of the Minister of Law
       Administrasi Badan Hukum dan Hak Asasi                           and Human Rights of the Republic of
       Manusia Republik Indonesia dalam Surat                           Indonesia         in         its         Letter
       No.      AHU-AH.01.03-0225926            tanggal                 No.       AHU-AH.01.03-0225926           dated
       20 Desember 2024. Peningkatan modal                              December 20, 2024. The acquisition of the
       tersebut tidak berdampak pada kepemilikan                        additional capital had no impact on the
       efektif Perusahaan yang tetap sebesar                            Company's effective ownership interest, which
       100,00%.                                                         remained at 100.00%.

       WRL                                                              WRL

       Berdasarkan Akta No. 40 tanggal 20 Desember                      Based on Deed No. 40, dated December 20,
       2024 dari Deni Thanur, S.H., Notaris di Jakarta,                 2024 of Deni Thanur, S.H., a Notary in Jakarta,
       para pemegang saham WRL menyetujui untuk                         the shareholders of WRL approved to increase
       meningkatkan modal ditempatkan dan disetor                       the issued and paid-up capital from
       dari Rp 25.753.000.000 terdiri dari 25.753                       Rp 25,753,000,000 divided into 25,753 shares
       saham          dengan          nilai    nominal                  with a par value of Rp 1,000,000 to
       Rp 1.000.000 menjadi Rp 27.046.000.000                           Rp 27,046,000,000 divided into 27,046 shares
       terdiri dari 27.046 saham dengan nilai nominal                   with a par value of Rp 1,000,000, by issuing
       Rp 1.000.000, dengan menerbitkan 1.293                           1,293 new shares or amounting to
       saham baru atau sebesar Rp 1.293.000.000                         Rp 1,293,000,000 which were all acquired by
       yang diambil seluruhnya oleh EMS. Akta                           EMS. The deed has been recorded in the
       tersebut telah dicatat di dalam database Sistem                  Database System of the Minister of Law
       Administrasi Badan Hukum dan Hak Asasi                           and Human Rights of the Republic of
       Manusia        Republik      Indonesia    dalam                  Indonesia         in         its         Letter
       Surat No. AHU-AH.01.03-0225922 tanggal                           No.       AHU-AH.01.03-0225922           dated
       20 Desember 2024. Peningkatan modal                              December 20, 2024. The acquisition of the
       tersebut tidak berdampak pada kepemilikan                        additional capital had no impact on the
       efektif Perusahaan yang tetap sebesar                            Company's effective ownership interest, which
       100,00%.                                                         remained at 100.00%.




                                                          - 10 -
Page 17
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


       BSA                                                              BSA

       Berdasarkan Akta No. 39 tanggal 20 Desember                      Based on Deed No. 39, dated December 20,
       2024 dari Deni Thanur, S.H., Notaris di Jakarta,                 2024 of Deni Thanur, S.H., a Notary in Jakarta,
       para pemegang saham BSA menyetujui untuk                         the shareholders of BSA approved to increase
       meningkatkan modal ditempatkan dan disetor                       the issued and paid-up capital from
       dari Rp 12.774.500.000 terdiri dari 127.745                      Rp 12,774,500,000 divided into 127,745 shares
       saham         dengan         nilai      nominal                  with a par value of Rp 100,000 to
       Rp 100.000 menjadi Rp 13.791.500.000 terdiri                     Rp 13,791,500,000 divided into 137,915 shares
       dari 137.915 saham dengan nilai nominal                          with a par value of Rp 1,000,000, by issuing
       Rp 100.000, dengan menerbitkan 10.170                            10,170 new shares or amounting to
       saham baru atau sebesar Rp 1.017.000.000                         Rp 1,017,000,000 which were all acquired by
       yang diambil seluruhnya oleh EMS. Akta                           EMS. The deed has been recorded in the
       tersebut serta telah dicatat di dalam database                   Database System of the Minister of Law
       Sistem Administrasi Badan Hukum dan Hak                          and Human Rights of the Republic of
       Asasi Manusia Republik Indonesia dalam Surat                     Indonesia         in         its         Letter
       No.      AHU-AH.01.03-0225915            tanggal                 No.       AHU-AH.01.03-0225915           dated
       20 Desember 2024. Peningkatan modal                              December 20, 2024. The acquisition of the
       tersebut tidak berdampak pada kepemilikan                        additional capital had no impact on the
       efektik Perusahaan yang tetap sebesar                            Company's effective ownership interest, which
       100,00%.                                                         remained at 100.00%.

       TKS                                                              TKS

       Berdasarkan       Akta    No.    263,    tanggal                 Based on Deed No. 263 dated December 19,
       19 Desember 2024 dari Hannywati Gunawan,                         2024 of Hannywati Gunawan, S.H., a Notary in
       S.H., Notaris di Jakarta, para pemegang saham                    Jakarta, the shareholders of TKS approved to
       TKS menyetujui untuk meningkatkan modal                          increase the authorized capital from
       dasar dari Rp 400.000.000.000 terdiri dari                       Rp 400,000,000,000 divided into 800,000
       800.000 saham dengan nilai nominal                               shares with a nominal value of Rp 500,000 to
       Rp 500.000 menjadi Rp 450.000.000.000 terdiri                    Rp 450,000,000,000 divided into 900,000
       dari 900.000 saham dengan nilai nominal                          shares with a nominal value Rp 500,000, as
       Rp 500.000, serta meningkatkan modal                             well as increasing the issued and paid-up
       ditempatkan         dan        disetor      dari                 capital from Rp 387,900,000,000 divided into
       Rp 387.900.000.000 terdiri dari 775.800 saham                    775,800 shares with a nominal value of
       dengan nilai nominal Rp 500.000 menjadi                          Rp 500,000 to Rp 416,650,000,000 divided into
       Rp 416.650.000.000 terdiri dari 833.300 saham                    833,300 shares with a nominal value of
       dengan nilai nominal Rp 500.000, yang diambil                    Rp 500,000, which were all acquired by the
       seluruhnya oleh Perusahaan. Akta tersebut                        Company. The deed was approved by the
       telah disetujui oleh Menteri Hukum dan Hak                       Minister of Law and Human Rights of the
       Asasi      Manusia       Republik      Indonesia                 republic of Indonesia in its Decision Letter
       dalam               Surat             Keputusan                  No. AHU-0083795.AH.01.02.Tahun 2024 dated
       No.     AHU-0083795.AH.01.02.Tahun         2024                  December 20, 2024 and was registered
       tanggal 20 Desember 2024 serta telah dicatat                     in the database Administration System of
       di dalam database Sistem Administrasi Badan                      the Ministry of Law and Human Rights of
       Hukum dan Hak Asasi Manusia Republik                             the Republic of Indonesia in Letter
       Indonesia               dalam              Surat                 No.        AHU-AH.01.03-0225489         dated
       No.       AHU-AH.01.03-0225489           tanggal                 December 20, 2024. The acquisition of the
       20 Desember 2024. Peningkatan modal                              additional capital had no impact on the
       tersebut tidak berdampak pada kepemilikan                        Company's effective ownership interest, which
       efektif Perusahaan yang tetap sebesar 99,99%.                    remained at 99.99%.




                                                          - 11 -
Page 18
PT GOLDEN ENERGY MINES Tbk                                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                        unless Otherwise Stated)


   d.   Izin Pertambangan Grup                                                          d.      The Group’s Mining Licenses

        RCI                                                                                     RCI

        Berdasarkan Keputusan Menteri Energi dan                                                Based on the Decision of the Ministry of
        Sumber Daya Mineral No. 835.K/30/DJB/2012                                               Energy        and        Mineral     Resources
        tanggal 26 September 2012, RCI telah                                                    No. 835.K/30/DJB/2012 dated September 26,
        memperoleh IUP Operasi Produksi Khusus                                                  2012, RCI has obtained License of Special
        untuk Pengangkutan dan Penjualan Batubara                                               Mining Operation Production for Transportation
        untuk jangka waktu 5 tahun. Berdasarkan                                                 and Trade of Coal which is valid for 5 years.
        Peraturan Menteri Energi dan Sumber Daya                                                Based on Regulation of the Minister of Energy
        Mineral No. 34 tahun 2017, RCI telah                                                    and Mineral Resources No. 34 year 2017, RCI
        melakukan penyesuaian IUP Operasi Khusus                                                has adjusted the License of Special Mining
        Untuk Pengangkutan dan Penjualan Batubara                                               Operation Production for Transportation and
        dengan mendapatkan Tanda Registrasi                                                     Trade of Coal by obtaining the Register
        Kegiatan Pengangkutan dan Penjualan                                                     Certificate of Activities for Transportation and
        No. 07183-00/TR-AJ/DBB/2017.                                                            Trade No. 07183-00/TR-AJ/DBB/2017.

        Berdasarkan Keputusan Kepala BPKM                                                       Based on the Decision of the Chairman of the
        No. 55/I/IUP-PB/PMDN/2016, RCI telah                                                    BPKM No. 55/I/IUP-PB/PMDN/2016, RCI has
        memperoleh        persetujuan     penyesuaian                                           obtained approval on the adjustment of
        kerjasama asal komoditas. Berdasarkan                                                   cooperation agreements for the commodity
        Keputusan Menteri Energi dan Sumber Daya                                                source. Based on the Decision of the Minister
        Mineral    dan      Menteri   Investasi/Kepala                                          of Energy and Mineral Resources and the
        Badan     Koordinasi     Penanaman       Modal                                          Minister of Investment/Head of the Investment
        No. 81202191527980003 tanggal 31 Juli 2023,                                             Coordinating Board No. 81202191527980003
        RCI telah mendapatkan Perizinan Berusaha                                                dated July 31, 2023, RCI has obtained
        Berbasis Risiko untuk Pengangkutan dan                                                  a    Risk-based     Business     License    for
        Penjualan Batubara dengan jangka waktu                                                  Transportation and Trade of Coal with a period
        5 tahun sejak ditetapkan Keputusan dan dapat                                            of 5 years since the Decree was approved and
        diperpanjang sesuai dengan ketentuan                                                    can be extended in accordance with statutory
        peraturan perundang-undangan.                                                           provisions.

        KIM                                                                                     KIM

        KIM telah memperoleh izin pengusahaan                                                   KIM has obtained the following coal mining
        pertambangan batubara sebagai berikut:                                                  licenses:
                                                                           Luas Area/                  No. Surat Keputusan/                 Masa Berlaku/
        No.          Izin KP/Licenses           Daerah/Location              Area                       Decision Letter No.                     Validity
                                                                         Hektar/Hectare

         1    IUP Operasi Produksi/            Kecamatan Jujuhan,               199                  Keputusan Bupati Bungo/            23 April 2010 s.d./up to
              Production Operations             Kabupaten Bungo,                                     Decision of Bupati Bungo               22 April 2018
                                             Provinsi/Province Jambi                                No. 252/DESDM Tahun 2010

         2    SK Perpanjangan                  Kecamatan Jujuhan,               199           Keputusan Kepala Dinas Penanaman Modal/   2 Oktober/October 2017
              IUP Operasi Produksi/             Kabupaten Bungo,                                     Decision of Head Investment               s.d./up to
              Decision Letter on Extension   Provinsi/Province Jambi                         No. 269/KEP.KA.DPMPTSP-6.I/IUPOP/X/2017    2 Oktober/October 2027
              of Production Operations




                                                                       - 12 -
Page 19
PT GOLDEN ENERGY MINES Tbk                                                                                     PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                         AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                          Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                     As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                              and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                         March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                               (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                               unless Otherwise Stated)


       TKS                                                                                            TKS

       TKS telah memperoleh izin pengusahaan                                                          TKS has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                         licenses:

                                                                                   Luas Area/                No. Surat Keputusan/                Masa Berlaku/
        No.          Izin KP/Licenses                Daerah/Location                 Area                     Decision Letter No.                    Validity
                                                                                 Hektar/Hectare

        1.    IUP Operasi Produksi/                  Desa Malateken,                 4.748               Keputusan Bupati Barito Utara/      26 April 2010 s.d./up to
              Production Operations           Gandring, Panaen, Liang Buah,                             Decision of Bupati - North Barito        25 April 2026
                                             Kecamatan Teweh Tengah/Central                                   No. 188.45/207/2010
                                                dan/and Teweh Timur/East ,
                                               Kabupaten Barito Utara/North ,
                                                     Provinsi/Province
                                                Kalimantan Tengah/Central

        2.    IUP Operasi Produksi/                  Desa Malateken,                 4.959               Keputusan Bupati Barito Utara/      26 April 2010 s.d./up to
              Production Operations             Gandring dan/and Panaen,                                Decision of Bupati - North Barito        25 April 2028
                                             Kecamatan Teweh Tengah/Central                                   No. 188.45/208/2010
                                                dan/and Teweh Timur/East ,
                                               Kabupaten Barito Utara/North ,
                                                     Provinsi/Province
                                                Kalimantan Tengah/Central

        3.    IUP Operasi Produksi/           Desa Saing, Patung, Gandrung,          1.748              Keputusan Bupati Barito Timur/       14 Agustus/August 2009
              Production Operations          Kecamatan Dusun Tengah/Central                             Decision of Bupati - East Barito           s.d./up to
                                                      dan/and Paku,                                        No. 570 tahun/year 2009           14 Agustus/August 2019
                                               Kabupaten Barito Timur/East ,
                                                     Provinsi/Province
                                                Kalimantan Tengah/Central

        4.    SK Perpanjangan                 Desa Saing, Patung, Gandrung,          1.748         Keputusan Kepala Dinas Penanaman Modal/   15 Agustus/August 2019
              IUP Operasi Produksi/          Kecamatan Dusun Tengah/Central                                Decision of Head Investment             s.d./up to
              Decision Letter on Extension            dan/and Paku,                               No. 570/52/DESDM-IUPOP/VII/DPMPTSP-2019    14 Agustus/August 2026
              of Production Operations         Kabupaten Barito Timur/East ,
                                                     Provinsi/Province
                                                Kalimantan Tengah/Central


       Berdasarkan            Surat       Direktorat                                                  Based on Letter from Directorate General of
       Jenderal      Perdagangan     Luar    Negeri                                                   Foreign Trade No. 03.ET-04.18.0078 dated
       No. 03.ET-04.18.0078 tanggal 17 Mei 2018,                                                      May 17, 2018, TKS has obtained recognition as
       TKS telah memperoleh penetapan sebagai                                                         a registered coal exporter.
       Eksportir Terdaftar Batubara.

       KMS                                                                                            KMS

       Berdasarkan Keputusan Kepala BKPM                                                              Based on the Decision of the Chairman of the
       No.     193/1/IUJP/PMDN/2018     tanggal                                                       BKPM No. 193/1/IUJP/PMDN/2018 dated
       31 Desember 2018, KMS telah mendapat Izin                                                      December 31, 2018, KMS has obtained Izin
       Usaha Jasa Pertambangan (IUJP).                                                                Usaha Jasa Pertambangan (IUJP).

       Berdasarkan           Surat        Keputusan                                                   Based on Decision Letter Minister of
       Menteri      Investasi/     Kepala    BKPM                                                     Investment/Chairman     of   the    BKPM
       No.       58/1/IUJP/PMDN/2023        tanggal                                                   No.        58/1/IUJP/PMDN/2023       dated
       29 Desember 2023, IUJP telah diperpanjang                                                      December 29, 2023, IUJP has been extended
       selama 5 tahun.                                                                                for 5 years.




                                                                                - 13 -
Page 20
PT GOLDEN ENERGY MINES Tbk                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                  unless Otherwise Stated)


       BORNEO                                                        BORNEO

       BORNEO telah memperoleh izin Pengusahaan                      BORNEO has obtained licenses to conduct
       Pertambangan Batubara dari instansi-instansi                  coal mining activities from the following
       berikut:                                                      institutes:

       •   Pemerintah Republik Indonesia diwakili                    •   The Government of the Republic of
           oleh PT Tambang Batubara Bukit Asam                           Indonesia as represented by PT Tambang
           (Persero)          (PTBA)          dalam                      Batubara Bukit Asam (Persero) (PTBA) in
           Perjanjian   Kerjasama      Pengusahaan                       Coal     Contract  of   Work    (CCoW)
           Pertambangan        Batubara    (PKP2B)                       No.      007/PK/PTBA-BI/1994      dated
           No.     007/PK/PTBA-BI/1994       tanggal                     August 15, 1994. Based on the
           15     Agustus     1994.     Berdasarkan                      Amendment in CCoW between PTBA and
           Amendemen PKP2B antara PTBA dan                               BORNEO dated June 27, 1997, effective
           BORNEO tanggal 27 Juni 1997, efektif                          July 1, 1997, all of PTBA’s rights and
           sejak tanggal 1 Juli 1997 semua hak dan                       obligations in CCoW have been
           kewajiban PTBA dalam PKP2B beralih                            transferred to the Government of the
           kepada Pemerintah Republik Indonesia                          Republic of Indonesia which was
           yang diwakili oleh Menteri Energi dan                         represented by Minister of Energy and
           Sumber Daya Mineral.                                          Mineral Resources.
       •   Pada 5 Agustus 2015, Pemerintah                           •   On August 5, 2015, the Government of the
           Republik Indonesia dan BORNEO telah                           Republic of Indonesia and BORNEO have
           menandatangani Amendemen           kedua                      signed the second Amendment of CCoW.
           PKP2B.
       •   Keputusan Menteri Energi dan Sumber                       •   Minister    of   Energy   and   Mineral
           Daya Mineral No. 10.K/40.00/DJB/ 2006                         Resources in his Decision Letter
           tanggal 17 Februari 2006 tentang                              No.       10.K/40.00/DJB/2006     dated
           Permulaan Tahap Kegiatan Produksi                             February 17, 2006 concerning the
           PKP2B seluas 24.100 hektar untuk jangka                       Beginning Stage of Production Activity of
           waktu 30 tahun.                                               CCoW for 24,100 hectares for a period of
                                                                         30 years.

       Berdasarkan    Keputusan     dari   Menteri                   Based on Decision of the Minister of
       Perhubungan No. KP 26 Tahun 2014 tanggal                      Transportation No. KP 26 Tahun 2014 dated
       9 Januari 2014, BORNEO telah memperoleh                       January 9, 2014, BORNEO has obtained
       Persetujuan Pengelolaan Terminal Untuk                        Transportation License for the Operational
       Kepentingan Sendiri (TUKS) di dalam daerah                    Activities of Terminal for Self Interest (TUKS) in
       lingkungan kerja dan daerah lingkungan                        operational territory and interest related
       kepentingan Pelabuhan Kotabaru, guna                          territory of Kotabaru port, to support
       menunjang kegiatan usaha di bidang                            BORNEO’s coal mining activities.
       pertambangan batubara BORNEO.

       Berdasarkan Perizinan Berusaha Untuk                          Based on Perizinan Berusaha Untuk
       Menunjang Kegiatan Usaha (PB-UMKU)                            Menunjang Kegiatan Usaha (PB-UMKU)
       No.     812031113135600170001     tanggal                     No.      812031113135600170001         dated
       1 Oktober 2024, BORNEO telah mendapatkan                      October 1, 2024, BORNEO has obtained the
       perpanjangan dengan masa berlaku 5 tahun                      extension for 5 years to carry out TUKS
       untuk melaksanakan kegiatan Pengoperasian                     Operation activities to support BORNEO’s coal
       TUKS guna menunjang kegiatan usaha                            mining activities.
       pertambangan Batubara BORNEO.

       Berdasarkan   Surat   Direktorat Jenderal                     Based on the letter from Directorate General of
       Perdagangan          Luar          Negeri                     Foreign Trade No. 03.ET-04.23.0254 dated
       No. 03.ET-04.23.0254 tanggal 8 Mei 2023,                      May 8, 2023, BORNEO has obtained
       BORNEO telah memperoleh penetapan                             recognition as a registered coal exporter.
       sebagai Eksportir Terdaftar Batubara dan
       Produk Batubara.




                                                       - 14 -
Page 21
PT GOLDEN ENERGY MINES Tbk                                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                     unless Otherwise Stated)


       KCP                                                                                    KCP

       KCP telah memperoleh izin pengusahaan                                                  KCP has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                 licenses:
                                                                          Luas Area/                No. Surat Keputusan/                  Masa Berlaku/
        No.          Izin KP/Licenses           Daerah/Location             Area                     Decision Letter No.                     Validity
                                                                        Hektar/Hectare

        1.    IUP Operasi Produksi/           Dusun Tanjung Belit,           143                  Keputusan Bupati Bungo/               22 Juli/July 2009
              Production Operations            Kecamatan Jujuhan,                                 Decision of Bupati Bungo                  s.d./up to
                                               Kabupaten Bungo,                                  No. 350/DESDM Tahun 2009               21 Juli/July 2019
                                             Provinsi/Province Jambi

        2.    SK Perpanjangan                 Dusun Tanjung Belit,           143           Keputusan Kepala Dinas Penanaman Modal/   24 Oktober/October 2018
              IUP Operasi Produksi/            Kecamatan Jujuhan,                                 Decision of Head Investment               s.d./up to
              Decision Letter on Extension     Kabupaten Bungo,                           No. 183/KEP.KA.DPMPTSP-6.I/IUPOP/X/2018    24 Oktober/October 2028
              of Production Operations       Provinsi/Province Jambi


       Berdasarkan           Surat          Direktorat                                        Based on the letter from Directorate General of
       Jenderal    Perdagangan        Luar     Negeri                                         Foreign Trade No. 03.ET-04.17.0204 dated
       No. 03.ET-04.17.0204 tanggal 19 Desember                                               December 19, 2017, KCP has obtained
       2017, KCP telah memperoleh penetapan                                                   recognition as a registered coal exporter.
       sebagai Eksportir Terdaftar Batubara.

       Berdasarkan           Surat          Direktorat                                        Based on the letter from Directorate General of
       Jenderal    Perdagangan        Luar     Negeri                                         Foreign Trade No. 03.ET-04.20.0215 dated
       No. 03.ET-04.20.0215 tanggal 2 November                                                November 2, 2020, KCP has obtained
       2020, KCP telah memperoleh penetapan                                                   recognition as a registered coal exporter.
       sebagai Eksportir Terdaftar Batubara.

       BBU                                                                                    BBU

       BBU telah memperoleh izin pengusahaan                                                  BBU has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                 licenses:
                                                                           Luas Area/                 No. Surat Keputusan/                  Masa Berlaku/
        No.          Izin KP/Licenses            Daerah/Location             Area                     Decision Letter No.                      Validity
                                                                         Hektar/Hectare

        1     IUP Operasi Produksi/           Dusun Tanjung Belit,           1.301                 Keputusan Bupati Bungo/                 9 Juli/July 2009
              Production Operations            Kecamatan Jujuhan,                                  Decision of Bupati Bungo                   s.d./up to
                                               Kabupaten Bungo,                                   No. 341/DESDM Tahun 2009                 8 Juli/July 2029
                                             Provinsi/Province Jambi


       Berdasarkan           Surat          Direktorat                                        Based on the letter from Directorate General of
       Jenderal    Perdagangan        Luar     Negeri                                         Foreign Trade No. 03.ET-04.21.0037 dated
       No. 03.ET-04.21.0037 tanggal 19 Februari                                               February 19, 2021, BBU has obtained
       2021, BBU telah memperoleh penetapan                                                   recognition as a registered coal exporter.
       sebagai Eksportir Terdaftar Batubara

       Berdasarkan      Surat   Direktorat Jenderal                                           Based on the letter from Directorate General of
       Perdagangan              Luar         Negeri                                           Foreign Trade No. 03.ET-04.24.0133 dated
       No. 03.ET-04.24.0133 tanggal 13 Maret 2024,                                            March 13, 2024, BBU has obtained recognition
       BBU telah memperoleh penetapan sebagai                                                 as a registered coal exporter.
       Eksportir Terdaftar Batubara




                                                                       - 15 -
Page 22
PT GOLDEN ENERGY MINES Tbk                                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                        unless Otherwise Stated)


       BHBA                                                                                  BHBA

       BHBA telah memperoleh izin pengusahaan                                                BHBA has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                licenses:

                                                                           Luas Area/                No. Surat Keputusan/                       Masa Berlaku/
        No.          Izin KP/Licenses           Daerah/Location              Area                     Decision Letter No.                          Validity
                                                                         Hektar/Hectare

        1.    IUP Operasi Produksi/           Dusun Tanjung Belit,            172                  Keputusan Bupati Bungo/                 23 April 2010 s.d./up to
              Production Operations            Kecamatan Jujuhan,                                  Decision of Bupati Bungo                    22 April 2016
                                               Kabupaten Bungo,                                   No. 247/DESDM Tahun 2010
                                             Provinsi/Province Jambi

        2.    SK Perpanjangan                 Dusun Tanjung Belit,            172                  Keputusan Bupati Bungo/               18 Desember/December 2014
              IUP Operasi Produksi/            Kecamatan Jujuhan,                                  Decision of Bupati Bungo                      s.d./up to
              Decision Letter on Extension     Kabupaten Bungo,                                   No. 576/DESDM Tahun 2014               17 Desember/December 2024
              of Production Operations       Provinsi/Province Jambi

        3     SK Perpanjangan                 Dusun Tanjung Belit,            172                 Keputusan Menteri Energi dan             29 Oktober/October 2024
              IUP Operasi Produksi/            Kecamatan Jujuhan,                               Sumber Daya Mineral/Decision of                   s.d./up to
              Decision Letter on Extension     Kabupaten Bungo,                           the Minister of Energy and Mineral Resources   18 Desember/December 2034
              of Production Operations       Provinsi/Province Jambi                                 No. 91204031317760006


       BNP                                                                                   BNP

       BNP telah memperoleh izin pengusahaan                                                 BNP has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                licenses:

                                                                           Luas Area/                 No. Surat Keputusan/                       Masa Berlaku/
        No.          Izin KP/Licenses           Daerah/Location              Area                      Decision Letter No.                          Validity
                                                                         Hektar/Hectare

        1.    IUP Operasi Produksi/           Dusun Tanjung Belit,              199                Keputusan Bupati Bungo/               30 Desember/December 2009
              Production Operations            Kecamatan Jujuhan,                                  Decision of Bupati Bungo                       s.d./up to
                                               Kabupaten Bungo,                                   No. 545/DESDM Tahun 2010                 29 Oktober/October 2019
                                             Provinsi/Province Jambi

        2.    SK Perpanjangan                 Dusun Tanjung Belit,              199                Keputusan Bupati Bungo/                   8 April 2019 s.d./up to
              IUP Operasi Produksi/            Kecamatan Jujuhan,                                  Decision of Bupati Bungo              30 Desember/December 2029
              Decision Letter on Extension     Kabupaten Bungo,                           No. 85/KEP.KA.DPMPTSP-6.1/IUPOP/IV/2019
              of Production Operations       Provinsi/Province Jambi


       TBBU                                                                                  TBBU

       TBBU telah memperoleh izin pengusahaan                                                TBBU has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                licenses:

                                                                           Luas Area/                 No. Surat Keputusan/                      Masa Berlaku/
        No.          Izin KP/Licenses           Daerah/Location              Area                      Decision Letter No.                          Validity
                                                                         Hektar/Hectare

        1.    IUP Operasi Produksi/           Dusun Tanjung Belit,              198                Keputusan Bupati Bungo/                  23 April 2010 s.d./up to
              Production Operations            Kecamatan Jujuhan,                                  Decision of Bupati Bungo                     22 April 2018
                                               Kabupaten Bungo,                                   No. 249/DESDM Tahun 2010
                                             Provinsi/Province Jambi

        2.    SK Perpanjangan                 Dusun Tanjung Belit,              198        Keputusan Kepala Dinas Penanaman Modal/         2 Oktober/October 2017
              IUP Operasi Produksi/            Kecamatan Jujuhan,                                 Decision of Head Investment                     s.d./up to
              Decision Letter on Extension     Kabupaten Bungo,                           No. 267/KEP.KA.DPMPTSP-6.I/IUPOP/X/2017          1 Oktober/October 2027
              of Production Operations       Provinsi/Province Jambi




                                                                       - 16 -
Page 23
PT GOLDEN ENERGY MINES Tbk                                                                                 PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                     AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                      Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                 As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                          and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                     March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                           (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                           unless Otherwise Stated)


       WRL                                                                                        WRL

       WRL telah memperoleh izin pengusahaan                                                      WRL has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                     licenses:
                                                                               Luas Area/                No. Surat Keputusan/                   Masa Berlaku/
        No.          Izin KP/Licenses              Daerah/Location               Area                     Decision Letter No.                       Validity
                                                                             Hektar/Hectare

        1.    IUP Operasi Produksi/             Kecamatan Sungai Keruh,          4.739             Keputusan Bupati Musi Banyuasin/           21 November 2008
              Production Operations            Kabupaten Musi Banyuasin,                           Decision of Bupati Musi Banyuasin              s.d./up to
                                                   Provinsi/Province                                     No. 1416 Tahun 2012                  20 November 2017
                                                Sumatera Selatan/South

        2.    Persetujuan Perubahan Masa        Kecamatan Sungai Keruh,          4.739           Keputusan Gubernur Sumatera Selatan/          Perpanjangan ijin
              Berlaku IUP Operasi Produksi/    Kabupaten Musi Banyuasin,                          Decision of Governor South Sumatera          sampai dengan/
              Approval Change of IUP               Provinsi/Province                              No. 234/KPTS/DISPERTAMBEN/2016         Extension of the License until
              Production Operations Validity    Sumatera Selatan/South                                                                        19 November 2027


       BSA                                                                                        BSA

       BSA telah memperoleh izin pengusahaan                                                      BSA has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                     licenses:
                                                                              Luas Area/                No. Surat Keputusan/                    Masa Berlaku/
        No.          Izin KP/Licenses              Daerah/Location              Area                     Decision Letter No.                       Validity
                                                                            Hektar/Hectare

        1.    IUP Operasi Produksi/            Kecamatan Asam Jujuhan,           199             Keputusan Gubernur Sumatera Barat/          20 September 2017
              Production Operations            Kabupaten Dharmasraya,                            Decision of Governor West Sumatera              s.d./up to
                                                   Provinsi/Province                                      No. 544-258-2017                   31 Desember 2026
                                                 Sumatera Barat/West


       KIS                                                                                        KIS

       KIS telah memperoleh izin pengusahaan                                                      KIS has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                     licenses:
                                                                               Luas Area/                No. Surat Keputusan/                   Masa Berlaku/
        No.          Izin KP/Licenses              Daerah/Location               Area                     Decision Letter No.                       Validity
                                                                             Hektar/Hectare

        1.    IUP Operasi Produksi dan            Kecamatan Jujuhan,              199                   Keputusan Bupati Bungo/                  23 April 2010
              Perubahan atas IUP tersebut/         Kabupaten Bungo,                                     Decision of Bupati Bungo                  s.d./up to
              Production Operations and         Provinsi/Province Jambi                               No. 251/DESDM Tahun 2010                   22 April 2020
              the Change of the IUP                                                                   Jo. Keputusan Bupati Bungo/
                                                                                                      Jo. Decision of Bupati Bungo
                                                                                                      No. 166/DESDM Tahun 2012

        2.    Persetujuan Pengalihan              Kecamatan Jujuhan,              199          Keputusan Kepala Dinas Penanaman Modal/      14 Maret/March 2018
              IUP Operasi Produksi/                Kabupaten Bungo,                                   Decision of Head Investment                 s.d./up to
              The Approved Transferred          Provinsi/Province Jambi                       No. 60/KEP.KA.DPMPTSP-6.1/IUPOP/III/2018     2 Oktober/October 2027
              IUP Production Operations


       BBM                                                                                        BBM

       BBM telah memperoleh izin pengusahaan                                                      BBM has obtained the following coal mining
       pertambangan batubara sebagai berikut:                                                     licenses:
                                                                              Luas Area/                 No. Surat Keputusan/                  Masa Berlaku/
        No.          Izin KP/Licenses              Daerah/Location              Area                     Decision Letter No.                       Validity
                                                                            Hektar/Hectare

        1.    IUP Operasi Produksi/              Dusun Tanjung Belit,            199                  Keputusan Bupati Bungo/                   23 April 2010
              Production Operations              Kecamatan Jujuhan,                                   Decision of Bupati Bungo                   s.d./up to
                                                  Kabupaten Bungo,                                   No. 250/DESDM Tahun 2010                   22 April 2018
                                                Provinsi/Province Jambi

        2.    SK Perpanjangan                    Dusun Tanjung Belit,            199           Keputusan Kepala Dinas Penanaman Modal/    2 Oktober/October 2017
              IUP Operasi Produksi/              Kecamatan Jujuhan,                                   Decision of Head Investment                s.d./up to
              Decision Letter on Extension        Kabupaten Bungo,                            No. 268/KEP.KA.DPMPTSP-6.I/IUPOP/X/2017     2 Oktober/October 2027
              of Production Operations          Provinsi/Province Jambi

        3.    Persetujuan Pengalihan              Kecamatan Jujuhan,             199           Keputusan Kepala Dinas Penanaman Modal/     14 Maret/March 2018
              IUP Operasi Produksi/                Kabupaten Bungo,                                   Decision of Head Investment                s.d./up to
              The Approved Transferred          Provinsi/Province Jambi                       No. 59/KEP.KA.DPMPTSP-6.1/IUPOP/III/2018    2 Oktober/October 2027
              IUP Production Operations




                                                                           - 17 -
Page 24
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


       BSL                                                              BSL

       BSL telah memperoleh izin Pengusahaan                            BSL has obtained licenses to conduct coal
       Pertambangan Batubara dari instansi-instansi                     mining activities from the following institutes:
       berikut:

       •     Pemerintah Republik Indonesia diwakili                     •     The Government of the Republic of
             oleh PT Tambang Batubara Bukit                                   Indonesia as represented by PT Tambang
             Asam       (Persero)    (PTBA)     dalam                         Batubara Bukit Asam (Persero) (PTBA) in
             Perjanjian    Kerjasama     Pengusahaan                          Coal    Contract     of   Work    (CCoW)
             Pertambangan        Batubara     (PKP2B)                         No.      015/PK/PTBA-BL/1994        dated
             No.     015/PK/PTBA-BL/1994       tanggal                        August 15, 1994. Based on the changes
             15 Agustus 1994. Berdasarkan perubahan                           in CCoW between PTBA and BSL dated
             PKP2B antara PTBA dan BSL tanggal                                June 27, 1997, effective July 1, 1997,
             27 Juni 1997, efektif sejak tanggal 1 Juli                       all of PTBA’s rights and obligations in
             1997 semua hak dan kewajiban PTBA                                CCoW have been transferred to the
             dalam PKP2B beralih kepada Pemerintah                            Government of the Republic of Indonesia
             Republik Indonesia yang diwakili oleh                            which was represented by Minister of
             Menteri Pertambangan dan Energi                                  Mining and Energy (currently the Minister
             (sekarang Menteri Energi dan Sumber                              of Energy and Mineral Resources).
             Daya Mineral). Pada 14 November 2017,                            On November 14, 2017, the Government
             Pemerintah Republik Indonesia dan BSL                            of the Republic of Indonesia and BSL have
             telah menandatangani Amendemen kedua                             signed the second Amendment of CCoW.
             PKP2B.
       •     Menteri Energi dan Sumber Daya                             •     Minister    of   Energy     and    Mineral
             Mineral     dalam     Surat    Keputusan                         Resources in his Decision Letter
             No. 718.K/30/DJB/2011 tanggal 31 Maret                           No.        718.K/30/DJB/2011        dated
             2011 tentang Permulaan Tahap Kegiatan                            March 31, 2011 concerning the Beginning
             Produksi PKP2B untuk jangka waktu                                Stage of Production Activity of CCoW for a
             30 tahun.                                                        period of 30 years.
       •     Menteri Energi dan Sumber Daya                             •     Minister    of   Energy     and    Mineral
             Mineral     dalam     Surat    Keputusan                         Resourcein      his    Decision     Letter
             No. 247.K/30/DJB/2018 tanggal 28 Mei                             No.        247.K/30/DJB/2018        dated
             2018 tentang Penciutan Wilayah PKP2B                             May 28, 2018 concerning the Region
             seluas 23.300 hektar.                                            Shrinkage of CCoW for 23,300 hectares.

       Berdasarkan     Surat     Direktorat Jenderal                    Based on the letter from Directorate General of
       Perdagangan Luar Negeri tanggal 9 Juli 2020,                     Foreign Trade dated July 9, 2020, BSL has
       BSL telah memperoleh pengakuan sebagai                           obtained recognition as a registered coal
       eksportir batubara terdaftar.                                    exporter.

       Berdasarkan Surat Pengakuan sebagai                              Based on the letter of Recognition Registered
       Eksportir Terdaftar Batubara ET. Batubara                        as   Exporter of Coal ET. Batubara
       No. 03.ET-04.23.0376 tanggal 22 Juni 2023,                       No. 03.ET04.23.0376 on June 22, 2023, BSL
       BSL telah memperoleh pengakuan sebagai                           has obtained recognition as a registered coal
       eksportir batubara terdaftar.                                    exporter.

       Berdasarkan Undang-undang No. 3 tahun 2020                       In accordance with Law No. 3 year 2020 update
       tentang perubahan atas Undang-undang                             from Law No. 4 year 2009, regarding mineral
       No. 4 Tahun 2009 tentang pertambangan                            and coal mining, the Group’s mining licenses
       mineral dan batubara, izin pertambangan Grup                     can be extended twice for a maximum of 10
       dapat diperpanjang dua kali, masing-masing                       years, each.
       maksimal selama 10 tahun.




                                                          - 18 -
Page 25
PT GOLDEN ENERGY MINES Tbk                                                                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                                   unless Otherwise Stated)


   e.   Area Eksplorasi dan Eksploitasi                                                                               e.      Exploration and Exploitation Area

        Grup memiliki area eksplorasi maupun                                                                                  The details of the Group’s exploration and
        eksploitasi/pengembangan sebagai berikut                                                                              exploitation/development area are as follows
        (tidak diaudit):                                                                                                      (unaudited):
                                                                                    Jumlah Aset Pertambangan
                                                                                      untuk Tambang dalam
                                                                                     Pengembangan dan pada                   Jumlah Cadangan                                      Jumlah Cadangan
                                                                                       Tahap Produksi pada                  Terbukti dan Terduga      Jumlah Produksi untuk      Terbukti dan Terduga
                                                                                      Tanggal 31 Maret 2025/                   pada Tanggal           Peiode yang Berakhir          pada Tanggal
                                                                                     Total Mine Properties for              31 Desember 2024 3)/        31 Maret 2025 3)/          31 Maret 2025 3)/
                                                                                   Mines under Construction and               Total Proven and          Total Production           Total Proven and
            Pemilik/                            Nama Lokasi/                          Producing Mines as of                Probable Reserves as of     for the year ended       Probable Reserves as of
        License Owner                             Location                                March 31, 2025                    December 31, 2024 3)       March 31, 2025 3)           March 31, 2025 3)
                                                                                               US$                               Jutaan ton/                Jutaan ton/               Jutaan ton/
                                                                                                                                Million Tons               Million Tons              Million Tons

                                 Blok/Block Kusan dan Girimulya 2) 6)                               129.353.707                              556,2                     13,5                        542,7
                                 Blok/Block Sebamban 2) 6)                    Blok/Block                 997.236                               11,7                     0,6                            11,1
           BORNEO                                      2) 6)                  BORNEO
                                 Blok/Block Batulaki                                                       13.865                               8,5                         -                           8,5
                                                        2) 6)
                                 Blok/Block Pasopati                                                              -                             1,9                         -                           1,9

                                                                     2) 5)
              KIM                Blok/Block - II Muara Bungo                                                      -

              KCP                Blok/Block - Muara Bungo 2) 5)                                                   -

             TBBU                                                1) 5)            Blok/Block
                                 Blok/Block - Muara Bungo                                              1.465.135                               47,6                     0,4                            47,2
                                                                                     KIM

              BBU                                                1) 5)
                                 Blok/Block - Muara Bungo                                                  78.990

              BNP                Blok/Block - Muara Bungo 1) 5)                                            45.297

             WRL                                                      5) 7)
                                 Blok/Block - Musi Banyuasin                                             439.642                               87,2                         -                          87,2

              TKS                                               4)
                                 Blok/Block Muara Teweh                                                           -                             -                           -                             -
                                 Blok/Block Ampah 4) 5)                                                           -                             0,6                         -                           0,6

              BSL                Blok/Block Musi Rawas 2) 5)                                          54.842.403                             185,5                      0,1                        185,4

        Jumlah/Total                                                                                187.236.275                              899,2                     14,6                        884,6


        Catatan/Notes :
                          1)
                               Tambang dalam Pengembangan/Mines under Construction
                          2)
                               Sebagian merupakan Aset Pertambangan - Tambang dalam Pengembangan/Part is included in Mine Properties - Mines under Construction
                          3)
                               Tidak diaudit/Unaudited
                          4)
                               Berdasarkan data internal/Based on internal data
                          5)
                               Berdasarkan JORC Reserve Statement dari Salva Mining Pty. Ltd., pihak independen, yang diterbitkan pada bulan Januari 2023 dan setelah memperhitungkan produksi
                               batubara sampai dengan bulan Maret 2025 (jika ada)/
                               Based on JORC Reserve Statement from Salva Mining Pty. Ltd., an independent party, as issued in January 2023, and after considering coal production up to
                               March 2025 (if any)
                          6)
                               Berdasarkan Laporan KCMI/Based on KCMI Report
                          7)
                               Aset Eksplorasi dan Evaluasi/Exploration and Evaluation Asset.


        Akumulasi jumlah produksi batubara Grup                                                                               The Group’s accumulated total coal production
        sejak awal kegiatan eksploitasi sampai dengan                                                                         since the beginning of exploitation activity until
        tanggal 31 Maret 2025 dan 31 Desember 2024                                                                            March 31, 2025 and December 31, 2024
        masing-masing sebesar 323,04 juta ton dan                                                                             totaled to 323.04 million tons and 308.50 million
        308,50 juta ton (tidak diaudit).                                                                                      tons, respectively (unaudited).




                                                                                                 - 19 -
Page 26
PT GOLDEN ENERGY MINES Tbk                                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                      unless Otherwise Stated)


   f.   Cadangan Batubara                                                              f.    Coal Reserves

        Jumlah cadangan yang dimiliki oleh Grup pada                                         The details of coal reserves owned by the
        tanggal 31 Maret 2025 (tidak diaudit) adalah                                         Group as of March 31, 2025 (unaudited),
        sebagai berikut:                                                                     follows:

                                                                                                           Cadangan Batubara/Coal Reserves
                                         Lokasi/Location                                       Terbukti/Proven    Terduga/Probable      Jumlah/Total
                                                                                                 Jutaan Ton/         Jutaan Ton/         Jutaan Ton/
                                                                                                Million Tons        Million Tons         Million Tons

        Blok/Block BORNEO                                                                                  546,6                17,6                 564,2 2)
        Blok/Block KIM                                                                                      39,9                 7,2                  47,1 1)
        Blok/Block BSL                                                                                     137,7                47,8                 185,5 1)
        Blok/Block WRL                                                                                      33,8                53,4                  87,2 1)
        Blok/Block TKS                                                                                       0,2                 0,4                    0,6 1)

        Jumlah/Total                                                                                       758,2              126,4                  884,6

        Catatan/Notes :
        1)    Berdasarkan JORC Reserve Statement dari Salva Mining Pty. Ltd., pihak independen, yang diterbitkan pada bulan Januari 2023 (Catatan 1f) dan
             setelah memperhitungkan produksi batubara sampai dengan Maret 2025 (jika ada)/
             Based on JORC Reserve Statement from Salva Mining Pty. Ltd., an independent party, issued in January 2023 (Note 1f) and after considering coal
             production up to March 2025 (if any)
        2)   Berdasarkan Laporan KCMI/Based on KCMI Report


        Jumlah cadangan yang dimiliki oleh Grup pada                                         The details of coal reserves owned by the
        tanggal 31 Desember 2024 (tidak diaudit)                                             Group as of December 31, 2024 (unaudited),
        adalah sebagai berikut:                                                              follows:

                                                                                                           Cadangan Batubara/Coal Reserves
                                         Lokasi/Location                                       Terbukti/Proven    Terduga/Probable      Jumlah/Total
                                                                                                 Jutaan Ton/         Jutaan Ton/         Jutaan Ton/
                                                                                                Million Tons        Million Tons         Million Tons

        Blok/Block BORNEO                                                                                  546,6               31,7                  578,3 2)
        Blok/Block KIM                                                                                      39,9                 7,7                  47,6 1)
        Blok/Block BSL                                                                                     137,7               47,8                  185,5 1)
        Blok/Block WRL                                                                                      33,8               53,4                   87,2 1)
        Blok/Block TKS                                                                                       0,2                 0,4                    0,6 1)

        Jumlah/Total                                                                                       758,2              141,0                  899,2

        Catatan/Notes :
        1)    Berdasarkan JORC Reserve Statement dari Salva Mining Pty. Ltd., pihak independen, yang diterbitkan pada bulan Januari 2023 (Catatan 1f) dan
             setelah memperhitungkan produksi batubara sampai dengan Desember 2024 (jika ada)/
             Based on JORC Reserve Statement from Salva Mining Pty. Ltd., an independent party, issued in January 2023 (Note 1f) and after considering coal
             production up to December 2024 (if any)
        2)   Berdasarkan Laporan KCMI/Based on KCMI Report




                                                                         - 20 -
Page 27
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


   g.   Dewan Direksi, Komisaris dan Karyawan                        g.      Board of Commissioners, Directors and
                                                                             Employees

        Pada tanggal 31 Maret 2025 dan 31 Desember                           As of March 31, 2025 and December 31, 2024,
        2024, susunan Dewan Komisaris dan Direksi                            the members of the Company’s Boards of
        Perusahaan berdasarkan Akta Pernyataan                               Commissioners and Directors based on Deed
        Keputusan Rapat No. 129 tanggal 16 Mei 2024,                         of Stockholders’ Meeting No. 129 dated
        dibuat Hannywati Gunawan, S.H., notaris di                           May 16, 2024, of Hannywati Gunawan, S.H.,
        Jakarta adalah sebagai berikut:                                      notary in Jakarta, are as follows:

        Dewan Komisaris                                                                        Board of Commissioners
        Presiden Komisaris                 :               Lokita Prasetya                 :   President Commissioner
        Wakil Presiden Komisaris           :        Achmad Ananda Djajanegara              :   Vice President Commissioner
        Komisaris                          :              Alex Sutanto                     :   Commissioners
                                                           Feriwan Sinatra
        Komisaris Independen               :             Bambang Setiawan                  :   Independent Commissioners
                                                            Ketut Sanjaya


        Direksi                                                                                Board of Directors
        Presiden Direktur                  :                  Bonifasius                   :   President Director
        Wakil Presiden Direktur            :               Haris Mustarto                  :   Vice President Director
        Direktur                           :                Raden Utoro                    :   Directors
                                                          Yoghi Nuswantoro
                                                              Suhendra
                                                           Paulus Yuniardi

        Susunan     Komite Audit   pada   tanggal                            The members of the Audit Committee of
        31 Maret 2025 dan 31 Desember 2024 adalah                            the Company as of March 31, 2025 and
        sebagai berikut:                                                     December 31, 2024 are as follows:

                                               31 Maret 2025 and 31 Desember 2024/
                                               March 31, 2025 and December 31, 2024

        Ketua                :                          Bambang Setiawan                              :    Chairman
        Anggota              :                             Irwandy Arif                               :    Members
                                                          Ketut Sanjaya

        Personel manajemen kunci Grup terdiri dari                           The key management personnel of the Group
        Komisaris dan Direksi.                                               consists of Commissioners and Directors.

        Jumlah karyawan Grup (tidak diaudit) pada                            As of March 31, 2025 and December 31 2024,
        tanggal 31 Maret 2025 dan 31 Desember 2024                           the Group has 607 and 572 employees
        masing-masing adalah 607 dan 572 karyawan.                           (unaudited), respectively. As of March 31, 2025
        Jumlah karyawan tetap Perusahaan (tidak                              and December 31, 2024, the Company has 25
        diaudit) pada tanggal 31 Maret 2025 dan                              employees (unaudited), respectively.
        31 Desember 2024 masing-masing adalah
        25 karyawan.

   h.   Penyelesaian       Laporan             Keuangan              h.      Completion     of  Interim       Consolidated
        Konsolidasian Interim                                                Financial Statements

        Laporan keuangan konsolidasian interim                               The interim consolidated financial statements
        PT Golden Energy Mines Tbk dan entitas anak                          of PT Golden Energy Mines Tbk and its
        untuk periode tiga bulan yang berakhir 31 Matet                      subsidiaries for the three-month period ended
        2025 telah diselesaikan dan diotorisasi untuk                        March 31, 2025 were completed and
        terbit oleh Direksi Perusahaan pada tanggal                          authorized for issuance on May 23, 2025 by the
        23 Mei 2025. Direksi bertanggung jawab atas                          Company’s Directors who are responsible for
        penyusunan dan penyajian laporan keuangan                            the preparation and the presentation of the
        konsolidasian interim tersebut.                                      interim consolidated financial statements.


                                                           - 21 -
Page 28
PT GOLDEN ENERGY MINES Tbk                                                                 PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                     AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                      Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                 As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                          and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                     March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                           (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                           unless Otherwise Stated)


2.   Informasi Kebijakan Akuntansi Material                         2.    Material Accounting Policy Information

     a.   Dasar   Penyusunan   dan    Pengukuran                          a.   Basis of the Interim Consolidated Financial
          Laporan Keuangan Konsolidasian Interim                               Statements Preparation and Measurement

          Laporan keuangan konsolidasian interim                               The interim consolidated financial statements
          disusun dan disajikan dengan menggunakan                             have been prepared and presented in
          Standar Akuntansi Keuangan di Indonesia,                             accordance       with   Indonesian     Financial
          meliputi pernyataan dan interpretasi yang                            Accounting Standards “SAK” which comprise
          diterbitkan oleh Dewan Standar Akuntansi                             the statements and interpretations issued by
          Keuangan Ikatan Akuntan Indonesia (IAI) dan                          the Board of Financial Accounting Standards of
          Peraturan OJK No. VIII.G.7 tentang “Penyajian                        the    Institute    of   Indonesia    Chartered
          dan Pengungkapan Laporan Keuangan Emiten                             Accountants (IAI) and OJK Regulation No.
          atau Perusahaan Publik”.                                             VIII.G.7.     regarding    “Presentation    and
                                                                               Disclosures of Public Companies’ Financial
                                                                               Statements”. Such financial statements are an
                                                                               English translation of the Group’s statutory
                                                                               report in Indonesia.

          Dasar     pengukuran    laporan   keuangan                           The measurement basis used is the historical
          konsolidasian interim adalah konsep biaya                            cost, except for certain accounts which are
          perolehan, kecuali beberapa akun tertentu                            measured on the bases described in the related
          disusun    berdasarkan    pengukuran     lain,                       accounting policies. The interim consolidated
          sebagaimana diuraikan dalam kebijakan                                financial   statements,   except    for    the
          akuntansi masing-masing akun tersebut.                               consolidated statements of cash flows, are
          Laporan keuangan konsolidasian interim ini                           prepared under the accrual basis of
          disusun dengan metode akrual, kecuali laporan                        accounting.
          arus kas konsolidasian.

          Laporan arus kas konsolidasian disusun                               The consolidated statements of cash flows are
          dengan menggunakan metode langsung                                   prepared using the direct method with
          dengan mengelompokkan arus kas dalam                                 classifications of cash flows into operating,
          aktivitas operasi, investasi dan pendanaan.                          investing and financing activities.

          Laporan keuangan GEMSTR, entitas anak di                             The financial statements of GEMSTR, a
          Singapura, telah disusun dan disajikan sesuai                        subsidiary in Singapore, has been prepared
          dengan     Singapore    Financial   Reporting                        and presented in accordance with Singapore
          Standards (SFRS). Tidak ada rekonsiliasi                             Financial Reporting Standards (SFRS). There
          antara SFRS dan SAK karena tidak ada                                 is no reconciliation between SFRS and SAK as
          perbedaan signifikan antara SFRS dan SAK                             there is no significant difference between SFRS
          yang diterapkan dalam penyusunan dan                                 and SAK applied for the preparation and
          penyajian laporan keuangan GEMSTR.                                   presentation       of     GEMSTR’s       financial
                                                                               statements.

          Kebijakan akuntansi yang diterapkan dalam                            The accounting policies adopted in the
          penyusunan laporan keuangan konsolidasian                            preparation of the interim consolidated financial
          interim untuk periode tiga bulan yang berakhir                       statements for the three-month period ended
          31 Maret 2025 adalah konsisten dengan                                March 31, 2025 are consistent with those
          kebijakan akuntansi yang diterapkan dalam                            adopted in the preparation of the interim
          penyusunan laporan keuangan konsolidasian                            consolidated financial statements for the year
          interim    untuk    tahun     yang    berakhir                       ended December 31, 2024.
          31 Desember 2024.

          Grup telah menyusun laporan keuangan                                 The Group has prepared the interim
          konsolidasian interim dengan dasar bahwa                             consolidated financial statements on the basis
          Grup    akan    terus   beroperasi secara                            that it will continue to operate as a going
          berkesinambungan.                                                    concern.




                                                           - 22 -
Page 29
PT GOLDEN ENERGY MINES Tbk                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                        unless Otherwise Stated)


   b.   Prinsip Konsolidasi                                            b.   Basis of Consolidation

        Laporan keuangan konsolidasian interim                              The interim consolidated financial statements
        meliputi laporan keuangan Perusahaan dan                            incorporate the financial statements of the
        entitas-entitas (termasuk entitas terstruktur)                      Company and entities (including structured
        yang dikendalikan oleh Perusahaan dan entitas                       entities) controlled by the Company and its
        anak (Grup). Pengendalian diperoleh apabila                         subsidiaries (the Group). Control is achieved
        Grup memiliki seluruh hal berikut ini:                              when the Group has all the following:

        i.     kekuasaan atas investee;                                     i.     power over the investee;
        ii.    eksposur atau hak atas imbal hasil variabel                  ii.    is exposed, or has rights, to variable
               dari keterlibatannya dengan investee; dan                           returns from its involvement with the
                                                                                   investee; and
        iii.   kemampuan      untuk     menggunakan                         iii.   the ability to use its power on the investee
               kekuasaannya atas investee untuk                                    to affect its returns.
               mempengaruhi jumlah imbal hasil Grup.

        Bila Grup tidak memiliki hak suara atau hak                         When the Group has less than a majority of the
        serupa secara mayoritas atas suatu investee,                        voting or similar rights of an investee, the Group
        Grup mempertimbangkan semua fakta dan                               considers all relevant facts and circumstances
        keadaan yang relevan dalam mengevaluasi                             in assessing whether it has power over an
        apakah mereka memiliki kekuasaan atas                               investee, including:
        investee, termasuk:

        i)   Pengaturan kontraktual dengan pemilik                          i)     The contractual arrangement with the
             hak suara lainnya dari investee,                                      other vote holders of the investee,
        ii) Hak yang timbul atas pengaturan                                 ii)    Rights arising from other contractual
             kontraktual lain, dan                                                 arrangements, and
        iii) Hak suara dan hak suara potensial yang                         iii)   The Group's voting rights and potential
             dimiliki Grup.                                                        voting rights.

        Grup menilai kembali apakah mereka                                  The Group re-assesses whether or not it
        mengendalikan investee bila fakta dan keadaan                       controls an investee if facts and circumstances
        mengindikasikan adanya perubahan terhadap                           indicate that there are changes to one or more
        satu atau lebih dari ketiga elemen dari                             of the three elements of control. Consolidation
        pengendalian. Konsolidasi atas entitas-entitas                      of a subsidiary begins when the Group obtains
        anak dimulai sejak Grup memperoleh                                  control over the subsidiary and ceases when
        pengendalian atas entitas anak dan berakhir                         the Group loses control of the subsidiary.
        pada saat Grup kehilangan pengendalian atas                         Assets, liabilities, income and expenses of a
        entitas anak. Aset, liabilitas, penghasilan dan                     subsidiary acquired during the year are
        beban dari entitas anak yang diakuisisi pada                        included in the interim consolidated financial
        tahun tertentu disertakan dalam laporan                             statements from the date the Group gains
        keuangan konsolidasian interim sejak tanggal                        control until the date the Group ceases to
        Grup memperoleh kendali sampai tanggal Grup                         control the subsidiary.
        tidak lagi mengendalikan entitas anak tersebut.

        Seluruh laba rugi dan setiap komponen                               Profit or loss and each component of other
        penghasilan       komprehensif     lain   (PKL)                     comprehensive income (OCI) are attributed to
        diatribusikan pada pemilik entitas induk dan                        the equity holders of the parent of the Group
        pada kepentingan nonpengendali (KNP),                               and to the non-controlling interests (NCI), even
        walaupun hal ini akan menyebabkan saldo KNP                         if this results in the NCI having a deficit balance.
        yang defisit. Bila dipandang perlu, penyesuaian                     When necessary, adjustments are made to the
        dilakukan terhadap laporan keuangan entitas                         financial statements of subsidiaries to bring
        anak untuk diselaraskan dengan kebijakan                            their accounting policies into line with the
        akuntansi Grup.                                                     Group’s accounting policies.

        Seluruh aset dan liabilitas, ekuitas, penghasilan                   All intra-group assets and liabilities, equity,
        dan beban dan arus kas atas transaksi antar                         income, expenses and cash flows relation to
        anggota Grup dieliminasi sepenuhnya pada                            transactions between members of the Group
        saat konsolidasi.                                                   are eliminated in full on consolidation.


                                                             - 23 -
Page 30
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


        Perubahan dalam bagian kepemilikan entitas                         A change in the parent’s ownership interest in a
        induk pada entitas anak yang tidak                                 subsidiary, without a loss of control, is
        mengakibatkan       hilangnya    pengendalian,                     accounted for as an equity transaction. If the
        dicatat sebagai transaksi ekuitas. Bila Grup                       Group loses control over a subsidiary, it
        kehilangan pengendalian atas suatu entitas                         derecognizes the related assets (including
        anak, maka menghentikan pengakuan atas                             goodwill), liabilities, NCI and other component
        aset (termasuk goodwill), liabilitas, KNP dan                      of equity, while the difference is recognized in
        komponen lain dari ekuitas terkait, dan                            the profit or loss. Any investment retained is
        selisihnya diakui pada laba rugi. Bagian dari                      recognized at fair value.
        investasi yang tersisa diakui pada nilai wajar.

   c.   Penjabaran Mata Uang Asing                                    c.   Foreign Currency Translation

        Mata Uang Fungsional dan Pelaporan                                 Functional and Reporting Currencies

        Akun-akun yang tercakup dalam laporan                              Items included in the financial statements of
        keuangan setiap entitas dalam Grup diukur                          each of the Group’s companies are measured
        menggunakan mata uang dari lingkungan                              using the currency of the primary economic
        ekonomi utama dimana entitas beroperasi                            environment in which the entity operates (the
        (mata uang fungsional).                                            functional currency).

        Transaksi dan Saldo                                                Transaction and Balances

        Transaksi dalam mata uang asing dicatat                            Transactions involving foreign currencies are
        berdasarkan kurs yang berlaku pada saat                            recorded at the rates of exchange prevailing at
        transaksi dilakukan. Pada tanggal pelaporan,                       the time the transactions are made. At the
        aset dan liabilitas moneter dalam mata uang                        reporting date, monetary assets and liabilities
        asing dijabarkan sesuai dengan rata-rata kurs                      denominated in foreign currencies are adjusted
        jual dan beli yang diterbitkan oleh Bank                           to reflect the average of the selling and buying
        Indonesia pada tanggal transaksi perbankan                         rates of exchange prevailing at the last banking
        terakhir untuk tahun yang bersangkutan dan                         transaction date of the year, as published by
        laba atau rugi kurs yang timbul, dikreditkan atau                  Bank Indonesia and any resulting gains or
        dibebankan pada operasi tahun berjalan.                            losses are credited or charged to operations of
                                                                           the current year.

        Grup menggunakan Dolar Amerika Serikat                             The Group used United States Dollar (USD) as
        (USD) sebagai mata uang fungsional dan                             the Group’s functional and reporting currency.
        pelaporan Grup.

        Sehubungan dengan penyajian laporan                                In preparing the interim consolidated financial
        keuangan konsolidasian interim Grup, laporan                       statements of the Group, financial statements
        keuangan RCI, TKS, UNSOCO, KMS, GEMS                               of RCI, TKS, UNSOCO, KMS, GEMS Energy
        Energy serta EMS dan entitas anaknya                               and EMS and its subsidiaries were translated to
        dijabarkan ke dalam mata uang Dolar Amerika                        United States Dollar currency based on the
        Serikat dengan cara sebagai berikut:                               following:
        •    Aset dan liabilitas, baik moneter maupun                      •    Assets and liabilities, both monetary and
             non-moneter,        dijabarkan      dengan                         non-monetary, are translated using the
             menggunakan kurs penutup;                                          closing rate of exchange;
        •    Pendapatan dan beban dijabarkan dengan                        •    Revenues and expenses are translated
             menggunakan kurs yang berlaku pada                                 using transactions date exchange rate or,
             tanggal transaksi atau, bila memenuhi                              if applicable, the average rate for the year;
             syarat, kurs rata-rata tahun tersebut;
        •    Selisih kurs yang terjadi disajikan sebagai                   •   The resulting exchange difference is
             “Komponen Ekuitas Lainnya” sebagai                                presented     as     an    “Other Equity
             bagian dari ekuitas sampai pelepasan                              Component” in the equity section until
             investasi neto yang bersangkutan.                                 disposal of the net investment.




                                                            - 24 -
Page 31
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


        Pada tanggal 31 Maret 2025 dan 2024, kurs                         As of March 31, 2025 and 2024, the conversion
        konversi yakni kurs tengah Bank Indonesia,                        rates used by the Group were the middle rates
        yang digunakan oleh Grup adalah sebagai                           of Bank Indonesia as follows:
        berikut:

                                                   31 Maret/         31 Desember/
                                                   March 31,         December 31,
                     Valuta Asing                    2025                2024                     Foreign Currency
                                                     US$                 US$
        1.000 Rupiah                                       0,0603              0,0619   1,000 Rupiah
        1 Dolar Singapura                                  0,7479              0,7375   1 Singapore Dollar

   d.   Klasifikasi Lancar dan Tidak Lancar                          d.   Current and Non-current Classification

        Grup menyajikan aset dan liabilitas dalam                         The Group presents assets and liabilities in the
        laporan   posisi    keuangan      konsolidasian                   consolidated statement of financial position
        berdasarkan klasifikasi lancar/tak lancar.                        based on current/non-current classification.

        Suatu aset disajikan lancar bila:                                 An asset is current when it is:

        i)   akan direalisasi, dijual atau dikonsumsi                     i)   expected to be realized or intended to be
             dalam siklus operasi normal,                                      sold or consumed in the normal operating
                                                                               cycle,
        ii) untuk diperdagangkan,                                         ii) held primarily for the purpose of trading,
        iii) akan direalisasi dalam 12 bulan setelah                      iii) expected to be realized within 12 months
             tanggal pelaporan, atau                                           after the reporting period, or
        iv) kas atau setara kas kecuali yang dibatasi                     iv) cash or cash equivalents unless restricted
             penggunaannya atau akan digunakan                                 from being exchanged or used to settle a
             untuk melunasi suatu liabilitas dalam kurun                       liability for at least 12 months after the
             waktu 12 bulan setelah tanggal pelaporan.                         reporting period.

        Seluruh aset lain diklasifikasikan sebagai tidak                  All other assets are classified as non-current.
        lancar.

        Suatu liabilitas disajikan jangka pendek bila:                    A liability is current when it is:

        i)   akan dilunasi dalam siklus operasi normal,                   i)   expected to be settled in the normal
                                                                               operating cycle,
        ii) untuk diperdagangkan,                                         ii) held primarily for the purpose of trading,
        iii) akan dilunasi dalam 12 bulan setelah                         iii) due to be settled within twelve months
             tanggal pelaporan, atau                                           after the reporting period, or
        iv) tidak ada hak pada akhir periode pelaporan                    iv) there is no right at the end of the reporting
             untuk    menangguhkan       pelunasannya                          period to defer the settlement of the liability
             dalam kurun waktu 12 bulan setelah                                for at least twelve months after the
             tanggal pelaporan.                                                reporting period.

        Seluruh liabilitas lain diklasifikasikan sebagai                  All other liabilities are classified as non-current.
        jangka panjang.

   e.   Pengukuran Nilai Wajar                                       e.   Fair Value Measurement

        Grup mengukur pada pengakuan awal                                 The Group initially measures financial
        Instrumen keuangan, dan aset dan liabilitas                       instruments, and assets and liabilities of the
        yang diperoleh melalui kombinasi bisnis pada                      acquirees upon business combinations at fair
        nilai wajar. Grup juga mengukur jumlah                            value. They also measure certain recoverable
        terpulihkan dari Unit Penghasil Kas (UPK)                         amounts of the Cash Generating Unit (CGU)
        tertentu berdasarkan nilai wajar dikurangi biaya                  using fair value less cost of disposal (FVLCD)
        pelepasan, dan aset keuangan tertentu pada                        and certain financial assets at fair value through
        nilai wajar melalui penghasilan komprehensif                      other comprehensive income (FVOCI).
        lain (NWPKL).



                                                           - 25 -
Page 32
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


       Nilai wajar adalah harga yang akan diterima                       Fair value is the price that would be received to
       dari menjual suatu aset atau harga yang akan                      sell an asset or paid to transfer a liability in an
       dibayar untuk mengalihkan suatu liabilitas                        orderly     transaction       between       market
       dalam transaksi teratur antara pelaku pasar                       participants at the measurement date. The fair
       pada tanggal pengukuran. Pengukuran nilai                         value measurement is based on the
       wajar mengasumsikan bahwa transaksi untuk                         presumption that the transaction to sell the
       menjual aset atau mengalihkan liabilitas terjadi:                 asset or transfer the liability takes place either:

       i)    Di pasar utama untuk aset atau liabilitas                   i)    In the principal market for the asset or
             tersebut, atau                                                    liability, or
       ii)   Jika tidak terdapat pasar utama, di pasar                   ii)   In the absence of a principal market, in the
             yang paling menguntungkan untuk aset                              most advantageous market for the asset or
             atau liabilitas tersebut.                                         liability.

       Pasar utama atau pasar yang paling                                The principal or the most advantageous market
       menguntungkan tersebut harus dapat diakses                        must be accessible to by the Group.
       oleh Grup.

       Nilai wajar dari aset atau liabilitas diukur                      The fair value of an asset or a liability is
       dengan menggunakan asumsi yang akan                               measured using the assumptions that market
       digunakan pelaku pasar ketika menentukan                          participants would use when pricing the asset
       harga aset atau liabilitas tersebut, dengan                       or liability, assuming that market participants
       asumsi bahwa pelaku pasar bertindak dalam                         act in their economic best interest.
       kepentingan ekonomi terbaiknya.

       Pengukuran nilai wajar dari suatu aset non                        A fair value measurement of a non-financial
       keuangan memperhitungkan kemampuan                                asset takes into account a market participant's
       pelaku pasar untuk menghasilkan manfaat                           ability to generate economic benefits by using
       ekonomik dengan menggunakan aset dalam                            the asset in its highest and best use or by
       penggunaan tertinggi dan terbaiknya atau                          selling it to another market participant that
       dengan menjualnya kepada pelaku pasar lain                        would use the asset in its highest and best use.
       yang akan menggunakan aset tersebut pada
       penggunaan tertinggi dan terbaiknya.

       Grup menggunakan teknik penilaian yang                            The Group uses valuation techniques that are
       sesuai dengan keadaan dan data yang                               appropriate in the circumstances and for which
       memadai tersedia untuk mengukur nilai wajar,                      sufficient data are available to measure fair
       dengan memaksimalkan masukan (input) yang                         value, maximizing the use of relevant
       dapat diamati (observable) yang relevan dan                       observable inputs and minimizing the use of
       meminimalkan masukan (input) yang tidak                           unobservable inputs.
       dapat diamati (unobservable).

       Semua aset dan liabilitas yang nilai wajarnya                     All assets and liabilities for which fair value is
       diukur atau diungkapkan dalam laporan                             measured or disclosed in the interim
       keuangan konsolidasian interim dikategorikan                      consolidated     financial     statements     are
       dalam hierarki nilai wajar berdasarkan level                      categorized within the fair value hierarchy,
       masukan (input) paling rendah yang signifikan                     described as follows, based on the lowest level
       terhadap pengukuran nilai wajar secara                            input that is significant to the fair value
       keseluruhan sebagai berikut:                                      measurement as a whole:

       i)    Level 1 - Harga kuotasian (tanpa                            i)    Level 1 - Quoted (unadjusted) market
             penyesuaian) di pasar aktif untuk aset atau                       prices in active markets for identical assets
             liabilitas yang identik yang dapat diakses                        or liabilities that can be accessed at
             entitas pada tanggal pengukuran.                                  measurement date.

       ii)   Level 2 - Teknik penilaian yang                             ii)   Level 2 - Valuation techniques for which
             menggunakan tingkat masukan (input)                               the lowest level input that is significant to
             yang paling rendah yang signifikan                                the fair value measurement is directly or
             terhadap pengukuran nilai wajar yang                              indirectly observable.
             dapat diamati (observable) baik secara
             langsung atau tidak langsung.



                                                           - 26 -
Page 33
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


        iii) Level 3 - Teknik penilaian yang                               iii)   Level 3 - Valuation techniques for which
             menggunakan tingkat masukan (input)                                  the lowest level input that is significant to
             yang paling rendah yang signifikan                                   the    fair   value     measurement        is
             terhadap pengukuran nilai wajar yang tidak                           unobservable.
             dapat diamati (unobservable).

        Untuk aset dan liabilitas yang diakui pada                         For assets and liabilities that are recognized in
        laporan keuangan konsolidasian interim secara                      the interim consolidated financial statements on
        berulang, Grup menentukan apakah terdapat                          a recurring basis, the Group determines
        perpindahan antara level dalam hierarki dengan                     whether transfers have occurred between
        melakukan evaluasi ulang atas penetapan                            levels in the hierarchy by re-assessing
        kategori (berdasarkan level masukan (input)                        categorization (based on the lowest level input
        paling rendah yang signifikan terhadap                             that is significant to the fair value measurement
        pengukuran nilai wajar secara keseluruhan)                         as a whole) at the end of each reporting period.
        pada tiap akhir periode pelaporan.

        Tim        pelaporan       keuangan       Grup                     The Group’s financial reporting team in charge
        bertanggungjawab atas penilaian dalam                              of valuation to determine the policies and
        menentukan kebijakan dan prosedur untuk                            procedures     for   recurring     fair  value
        pengukuran nilai wajar berulang, seperti nilai                     measurement, such as fair value (less costs of
        wajar (dikurangi biaya untuk menjual) UPK                          disposal) of CGUs (for impairment test
        (untuk uji penurunan nilai), dan aset keuangan                     purpose) and financial assets at FVOCI.
        pada NWPKL.

        Keterlibatan penilai eksternal ditentukan setiap                   Involvement of external valuers is decided upon
        tahun setelah dibahas dan disetujui oleh Direksi                   annually after discussion with and approval by
        Perusahaan. Kriteria pemilihan termasuk                            the Company’s Board of Directors. Selection
        pengetahuan pasar, reputasi, independensi dan                      criteria include market knowledge, reputation,
        kemampuan mematuhi standar profesi. Metode                         independence and whether professional
        penilaian dan input yang digunakan dibahas                         standards      are    maintained.      Valuation
        dan diputuskan bersama oleh Grup dan penilai                       techniques and inputs to use were discussed
        eksternal.                                                         and decided by the Group and external valuers.

        Untuk tujuan pengungkapan nilai wajar, Grup                        For the purpose of fair value disclosures, the
        mementukan klasifikasi aset dan liabilitas                         Group has determined classes of assets and
        berdasarkan sifat, karakteristik dan risikonya                     liabilities on the basis of the nature,
        dan level pada hierarki nilai wajar sebagaimana                    characteristics and risks of the asset or liability
        dijelaskan di atas.                                                and the level of the fair value hierarchy as
                                                                           explained above.

   f.   Kas dan Setara Kas                                            f.   Cash and Cash Equivalents

        Kas dan setara kas dalam laporan posisi                            Cash and cash equivalents in the consolidated
        keuangan konsolidasian yang terdiri dari kas                       statements of financial position comprise cash
        dan bank serta deposito jangka pendek yang                         on hand and in banks and short-term deposits
        jatuh tempo dalam waktu 3 bulan atau kurang,                       with a maturity of 3 months or less, that are
        yang dapat segera dikonversikan menjadi kas                        readily convertible to a known amount of cash
        dalam jumlah yang dapat ditentukan dan                             and subject to an insignificant risk of changes
        memiliki risiko perubahan nilai yang tidak                         in value.
        signifikan.

   g.   Instrumen Keuangan                                            g.   Financial Instruments

        Instrumen keuangan adalah setiap kontrak                           Financial instruments are any contract that
        yang memberikan aset keuangan bagi satu                            gives rise to financial asset of one entity and a
        entitas dan liabilitas keuangan atau ekuitas bagi                  financial liability or equity instrument of another
        entitas lain.                                                      entity.




                                                            - 27 -
Page 34
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


       Aset Keuangan                                                   Financial Assets

       Pengakuan dan pengukuran awal                                   Initial recognition and measurement

       Pada pengakuan awal, Grup mengukur aset                         At initial recognition, the Group measures a
       keuangan pada nilai wajarnya ditambah biaya                     financial asset at its fair value plus transaction
       transaksi, dalam hal aset keuangan tidak diukur                 costs, in the case of a financial asset not at fair
       pada nilai wajar melalui laba rugi (NWLR).                      value through profit or loss (FVTPL). Trade
       Piutang usaha yang tidak mengandung                             receivables that do not contain a significant
       komponen pembiayaan yang signifikan, dimana                     financing component, for which the Group has
       Grup telah menerapkan cara praktis, yaitu                       applied the practical expedient are measured at
       diukur pada harga transaksi yang ditentukan                     the transaction price determined under
       sesuai PSAK No. 115.                                            PSAK No. 115.

       Agar aset keuangan diklasifikasikan dan diukur                  In order for a financial asset to be classified and
       pada biaya perolehan diamortisasi atau                          measured at amortized cost or FVOCI, it needs
       NWPKL, aset keuangan harus menghasilkan                         to give rise to cash flows that are ‘solely
       arus kas yang semata dari pembayaran pokok                      payments of principal and interest (SPPI)’ on
       dan bunga (SPPB) dari jumlah pokok terutang.                    the principal amount outstanding. This
       Penilaian ini disebut sebagai uji SPPB dan                      assessment is referred to as the SPPI test and
       dilakukan pada tingkat instrumen.                               is performed at an instrument level.

       Model bisnis Grup untuk mengelola aset                          The Group’s business model for managing
       keuangan mengacu pada bagaimana mereka                          financial assets refers to how it manages its
       mengelola     aset    keuangannya      untuk                    financial assets in order to generate cash flows.
       menghasilkan arus kas. Model bisnis                             The business model determines whether cash
       menentukan apakah arus kas akan dihasilkan                      flows will result from collecting contractual cash
       dari penerimaan arus kas kontraktual,                           flows, selling the financial assets, or both.
       penjualan aset keuangan, atau keduanya.

       Pengukuran selanjutnya                                          Subsequent measurement

       Untuk tujuan pengukuran selanjutnya, aset                       For purposes of subsequent measurement,
       keuangan diklasifikasikan dalam empat                           financial assets are classified in four
       kategori:                                                       categories:

       •   Aset keuangan pada biaya perolehan                          •   Financial assets at amortized cost (debt
           diamortisasi (instrumen utang),                                 instruments),
       •   Aset keuangan pada NWPKL dengan                             •   Financial assets at FVOCI with recycling of
           reklasifikasi ke keuntungan dan kerugian                        cumulative gains and losses (debt
           kumulatif (instrumen utang),                                    instruments),
       •   Aset keuangan pada NWPKL tanpa                              •   Financial assets designated at FVOCI with
           reklasifikasi ke keuntungan dan kerugian                        no recycling of cumulative gains and
           kumulatif atas pelepasan (instrumen                             losses    upon     derecognition   (equity
           ekuitas), dan                                                   instruments), and
       •   NWLR.                                                       •   FVTPL.




                                                         - 28 -
Page 35
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


       Pengukuran selanjutnya dari aset keuangan                        The subsequent measurement of financial
       tergantung kepada klasifikasi masing-masing                      assets depends on their classification as
       aset keuangan seperti berikut ini:                               described below:

       Aset keuangan pada biaya             perolehan                   Financial assets at amortized cost (debt
       diamortisasi (instrumen utang)                                   instruments)

       Grup mengukur aset keuangan pada biaya                           The Group measures financial assets at
       perolehan diamortisasi jika kedua kondisi                        amortized cost if both of the following
       berikut terpenuhi:                                               conditions are met:

       •   Aset keuangan dimiliki dalam model bisnis                    •   The financial asset is held within a
           dengan tujuan untuk memiliki aset                                business model with the objective to hold
           keuangan dalam rangka mendapatkan                                financial assets in order to collect
           arus kas kontraktual, dan                                        contractual cash flows, and
       •   Persyaratan     kontraktual  dari    aset                    •   The contractual terms of the financial asset
           keuangan menghasilkan arus kas pada                              give rise on specified dates to cash flows
           tanggal tertentu yang merupakan SPPB                             that are SPPI on the principal amount
           dari jumlah pokok terutang.                                      outstanding.

       Aset keuangan yang diukur pada biaya                             Financial assets at amortized cost are
       perolehan diamortisasi selanjutnya diukur                        subsequently measured using the effective
       dengan menggunakan metode suku bunga                             interest (EIR) method and are subject to
       efektif (SBE) dan menjadi subjek penurunan                       impairment. Gains and losses are recognized in
       nilai. Keuntungan dan kerugian diakui dalam                      profit or loss when the asset is derecognized,
       laba rugi pada saat aset dihentikan                              modified or impaired.
       pengakuannya, dimodifikasi atau diturunkan
       nilainya.

       Pada tanggal 31 Maret 2025 dan 31 Desember                       As of March 31, 2025 and December 31, 2024,
       2024, kategori ini meliputi kas dan setara kas,                  the Group’s cash and cash equivalents, trade
       piutang usaha, piutang lain-lain – pihak ketiga,                 receivables, other receivables – third parties,
       dana yang dibatasi pencairannya dan aset tidak                   restricted funds and other non-current assets
       lancar lainnya.                                                  are included in this category.

       Penghentian pengakuan                                            Derecognition

       Aset keuangan (atau, sesuai dengan                               A financial asset (or, where applicable, a part of
       kondisinya, bagian dari aset keuangan atau                       a financial asset or part of a group of similar
       bagian dari kelompok aset keuangan serupa)                       financial assets) is primarily derecognized (i.e.,
       terutama dihentikan pengakuannya (yaitu,                         removed from the Group’s consolidated
       dihapuskan dari laporan posisi keuangan                          statement of financial position) when:
       konsolidasian Grup) ketika:

       •   Hak untuk menerima arus kas dari aset                        •   The rights to receive cash flows from the
           telah berakhir; atau                                             asset have expired; or
       •   Grup telah mengalihkan haknya untuk                          •   The Group has transferred its rights to
           menerima arus kas dari aset atau                                 receive cash flows from the asset or has
           menanggung kewajiban untuk membayar                              assumed an obligation to pay the received
           arus kas yang diterima tersebut secara                           cash flows in full without material delay to
           penuh tanpa penundaan yang material                              a third party under a ‘pass-through’
           kepada      pihak     ketiga    berdasarkan                      arrangement; and either (a) the Group has
           kesepakatan ‘pass-through’, dan salah                            transferred substantially all the risks and
           satu dari (a) Grup telah mengalihkan                             rewards of the asset, or (b) the Group has
           secara substansial seluruh risiko dan                            neither     transferred     nor     retained
           manfaat atas aset, atau (b) Grup tidak                           substantially all the risks and rewards of
           mengalihkan maupun tidak memiliki secara                         the asset, but has transferred control of the
           substansial atas seluruh risiko dan manfaat                      asset.
           atas aset, tetapi telah mengalihkan kendali
           atas aset.



                                                          - 29 -
Page 36
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


       Ketika Grup telah mengalihkan haknya untuk                       When the Group has transferred its rights to
       menerima arus kas dari suatu aset atau telah                     receive cash flows from an asset or has entered
       menandatangani kesepakatan ‘pass-through’,                       into a pass-through arrangement, it evaluates
       Grup mengevaluasi jika, dan sejauh mana,                         if, and to what extent, it has retained the risks
       Grup masih mempertahankan risiko dan                             and rewards of ownership. When it has neither
       manfaat atas kepemilikan aset. Ketika Grup                       transferred nor retained substantially all of the
       tidak mengalihkan maupun seluruh risiko dan                      risks and rewards of the asset, nor transferred
       manfaat atas aset dipertahankan secara                           control of the asset, the Group continues to
       substansial, maupun tidak mengalihkan kendali                    recognize the transferred asset to the extent of
       atas aset, Grup tetap mengakui aset yang                         its continuing involvement. In that case, the
       dialihkan        sebesar            keterlibatan                 Group also recognizes an associated liability.
       berkelanjutannya. Dalam kasus tersebut, Grup                     The transferred asset and the associated
       juga mengakui liabilitas terkait. Aset yang                      liability are measured on a basis that reflects
       dialihkan dan liabilitas terkait diukur dengan                   the rights and obligations that the Group has
       basis yang mencerminkan hak dan kewajiban                        retained.
       yang masih dipertahankan oleh Grup.

       Keterlibatan berkelanjutan dalam bentuk                          Continuing involvement that takes the form of a
       jaminan atas aset yang ditransfer, diukur pada                   guarantee over the transferred asset is
       nilai yang lebih rendah antara jumlah tercatat                   measured at the lower of the original carrying
       awal aset dan jumlah maksimum imbalan yang                       amount of the asset and the maximum amount
       dibutuhkan oleh Grup untuk membayar                              of consideration that the Group could be
       kembali.                                                         required to repay.

       Penurunan nilai                                                  Impairment

       Grup mengakui penyisihan Kerugian Kredit                         The Group recognizes an allowance for
       Ekspetasian (KKE) untuk semua instrumen                          Expected Credit Loss (ECL) for all debt
       utang yang bukan diukur pada NWLR dan                            instruments not held at FVTPL and financial
       kontrak jaminan keuangan. KKE ditentukan                         guarantee contracts. ECLs are based on the
       atas perbedaan antara arus kas kontraktual                       difference between the contractual cash flows
       menurut kontrak dan semua arus kas yang                          due in accordance with the contract and all the
       diharapkan akan diterima oleh Grup, yang                         cash flows that the Group expects to receive,
       didiskontokan dengan perkiraan SBE orisinal.                     discounted at an approximation of the original
       Arus kas yang diharapkan mencakup setiap                         EIR. The expected cash flows include any cash
       arus kas dari penjualan agunan yang dimiliki                     flows from the sale of collateral held or other
       atau perbaikan kredit lainnya yang merupakan                     credit enhancements that are integral to the
       bagian yang tidak terpisahkan dalam ketentuan                    contractual terms.
       kontrak.

       KKE diakui dalam dua tahap. Bila belum                           ECLs are recognized in two stages. When there
       terdapat peningkatan risiko kredit signifikan                    have not been significant increases in credit
       sejak pengakuan awal, KKE diakui untuk                           risks since initial recognition, ECLs are
       kerugian kredit yang dihasilkan dari peristiwa                   provided for credit losses that result from
       gagal bayar yang mungkin terjadi dalam jangka                    default events that are possible within the next
       waktu 12 bulan ke depan (KKE 12 bulan).                          12-months (a 12-month ECL). But, when there
       Namun, bila telah terdapat peningkatan                           have been significant increases in credit risks
       signifikan risiko kredit sejak pengakuan awal,                   since initial recognition, a loss allowance is
       penyisihan kerugian diakui untuk kerugian                        recognized for credit losses expected over the
       kredit yang diperkirakan selama sisa umur aset,                  remaining life of the asset, irrespective of timing
       tanpa mempertimbangkan waktu gagal bayar                         of the default (a lifetime ECL).
       (KKE sepanjang umurnya).




                                                          - 30 -
Page 37
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


       Karena aset kontrak, piutang usaha dan piutang                   Because its contract assets, trade and other
       lain-lainnya    tidak    memiliki    komponen                    receivables do not contain significant financing
       pembiayaan signifikan, Grup menerapkan                           component, the Group applies a simplified
       pendekatan yang disederhanakan dalam                             approach in calculating ECL. Therefore, the
       perhitungan KKE. Oleh karena itu, Grup tidak                     Group does not track changes in credit risk, but
       menelurusi perubahan dalam risiko kredit,                        instead recognizes a loss allowance based on
       namun justru mengakui penyisihan kerugian                        lifetime ECL at each reporting date. The Group
       berdasarkan KKE sepanjang umurnya pada                           established a provision matrix that is based on
       setiap tanggal pelaporan. Grup membentuk                         its historical credit loss experience, adjusted for
       matriks provisi berdasarkan pengalaman                           forward-looking factors specific to the debtors
       kerugian kredit masa lampau, disesuaikan                         and the economic environment.
       dengan perkiraan masa depan (forward-
       looking) atas faktor yang spesifik untuk debitur
       dan lingkungan ekonomi.

       Liabilitas Keuangan                                              Financial Liabilities

       Pengakuan dan pengukuran awal                                    Initial recognition and measurement

       Liabilitas keuangan diklasifikasikan, pada                       Financial liabilities are classified, at initial
       pengakuan awal, sebagai liabilitas keuangan                      recognition, as financial liabilities at FVTPL,
       yang diukur pada NWLR, utang dan pinjaman                        loans and borrowings, or as derivatives
       atau derivatif ditetapkan sebagai instrumen                      designated as hedging instruments in an
       lindung nilai pada lindung nilai yang efektif,                   effective hedge, as appropriate.
       sesuai dengan kondisinya.
       Semua liabilitas keuangan diakui pada nilai                      All financial liabilities are recognized initially at
       wajar saat pengakuan awal dan, dalam hal                         fair value and, in the case of financial liabilities
       liabilitas keuangan dilklasifikasi sebagai utang                 classified as loans and borrowings, recognized
       dan pinjaman, diakui pada nilai wajar setelah                    at fair value netted off directly to attributable
       dikurangi biaya transaksi yang dapat                             transaction costs.
       diatribusikan secara langsung.
       Pada tanggal 31 Maret 2025 dan 31 Desember                       As of March 31, 2025 and December 31, 2024,
       2024, Grup menetapkan liabilitas keuangan                        the Group designates its financial liabilities as
       meliputi utang bank, utang usaha, utang lain-                    bank loans, trade payables, other payables,
       lain, beban akrual dan utang sewa.                               accrued expenses and lease liabilities.

       Pengukuran selanjutnya                                           Subsequent measurement

       Pengukuran       selanjutnya dari liabilitas                     The subsequent measurement of financial
       keuangan ditentukan oleh klasifikasinya                          liabilities depends on their classification as
       sebagai berikut:                                                 described below:
       Liabilitas keuangan pada biaya perolehan                         Financial liabilities at amortized cost (Loans
       diamortisasi (Utang dan pinjaman)                                and borrowings)
       i)   Utang dan Pinjaman Jangka Panjang yang                      i)   Long-term Interest-bearing Loans and
            Dikenakan Bunga                                                  Borrowings
            Setelah pengakuan awal, utang dan                                Subsequent to initial recognition, long-
            pinjaman jangka panjang yang berbunga                            term     interest-bearing     loans       and
            diukur pada biaya perolehan yang                                 borrowings are measured at amortized
            diamortisasi   dengan     menggunakan                            acquisition costs using EIR method. At the
            metode SBE. Pada tanggal pelaporan,                              reporting date, accrued interest is
            biaya bunga yang masih harus dibayar                             recorded separately from the associated
            dicatat secara terpisah, dari pokok                              borrowings within the current liabilities
            pinjaman terkait, dalam bagian liabilitas                        section. Gains and losses are recognized
            jangka pendek. Keuntungan dan kerugian                           in the profit or loss when the liabilities are
            diakui pada laba rugi ketika liabilitas                          derecognized as well as through the EIR
            dihentikan pengakuannya maupun melalui                           amortization process.
            proses amortisasi menggunakan metode
            SBE.


                                                          - 31 -
Page 38
PT GOLDEN ENERGY MINES Tbk                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                        unless Otherwise Stated)


              Biaya     amortisasi   dihitung  dengan                             Amortized cost is calculated by taking into
              mempertimbangkan setiap diskonto atau                               account any discount or premium on
              premium atas akusisi dan komisi atau                                acquisition and fee or costs that are an
              biaya yang merupakan bagian tidak                                   integral part of the EIR. The EIR
              terpisahkan dari SBE. Amortisasi SBE                                amortization is included in finance costs in
              dicatat sebagai beban keuangan pada laba                            the profit or loss.
              rugi.

        ii)   Utang dan Akrual                                              ii)   Payables and Accruals

              Liabilitas untuk utang usaha dan utang lain-                        Liabilities for current trade and other
              lain jangka pendek, beban akrual dan                                accounts payable, accrued expenses and
              liabilitas imbalan kerja jangka pendek                              short-term employee benefits liability are
              dinyatakan sebesar jumlah tercatat (jumlah                          stated at carrying amounts (notional
              nosional), yang kurang lebih sebesar nilai                          amounts), which approximate their fair
              wajarnya.                                                           values.

        Penghentian pengakuan                                               Derecognition

        Suatu     liabilitas  keuangan dihentikan                           A financial liability is derecognized when the
        pengakuannya pada saat kewajiban yang                               obligation under the contract is discharged or
        ditetapkan dalam kontrak berakhir atau                              cancelled or expired.
        dibatalkan atau kedaluwarsa.

        Ketika sebuah liabilitas keuangan ditukar                           When an existing financial liability is replaced
        dengan liabilitas keuangan lain dari pemberi                        by another from the same lender on
        pinjaman yang sama atas persyaratan yang                            substantially different terms, or the terms of an
        secara substansial berbeda, atau bila                               existing liability are substantially modified, such
        persyaratan dari liabilitas keuangan tersebut                       an exchange or modification is treated as
        secara substansial dimodifikasi, pertukaran                         derecognition of the original liability and
        atau modifikasi persyaratan tersebut dicatat                        recognition of a new liability, and the difference
        sebagai penghentian pengakuan liabilitas                            in the respective carrying amounts is
        keuangan orisinal dan pengakuan liabilitas                          recognized in the profit or loss.
        keuangan baru, dan selisih antara nilai tercatat
        masing-masing liabilitas keuangan tersebut
        diakui pada laba rugi.

        Saling Hapus Instrumen Keuangan                                     Offsetting of Financial Instruments

        Aset keuangan dan liabilitas keuangan disaling                      Financial assets and financial liabilities are
        hapuskan dan nilai bersihnya disajikan dalam                        offset, and the net amount reported in the
        laporan posisi keuangan konsolidasian jika, dan                     consolidated statement of financial position if,
        hanya jika, terdapat hak secara hukum untuk                         and only if, there is a currently enforceable legal
        melakukan saling hapus atas jumlah tercatat                         right to offset the recognized amounts and
        dari aset keuangan dan liabilitas keuangan                          there is an intention to settle on a net basis, or
        tersebut      dan    terdapat  intensi    untuk                     to realize the assets and settle the liabilities
        menyelesaikan secara neto, atau untuk                               simultaneously.
        merealisasikan aset dan menyelesaikan
        liabilitas secara bersamaan.

   h.   Transaksi dengan Pihak Berelasi                                h.   Transactions with Related Parties

        Perusahaan dan entitas anaknya melakukan                            The Company and subsidiaries have
        transaksi dengan pihak berelasi sesuai dengan                       transactions with related parties as defined in
        definisi yang diuraikan pada PSAK No. 224.                          PSAK No. 224.




                                                             - 32 -
Page 39
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


        Transaksi     ini   dilakukan   berdasarkan                     The transactions are made based on terms
        persyaratan yang disetujui oleh kedua belah                     agreed by the parties, which may not be the
        pihak, yang mungkin tidak sama dengan                           same as those made with unrelated parties.
        transaksi lain yang dilakukan dengan pihak-
        pihak yang tidak berelasi.

        Transaksi dan saldo yang material dengan                        Significant transactions and balances with
        pihak berelasi diungkapkan dalam Catatan 35.                    related parties are disclosed in Note 35.

        Kecuali diungkapkan khusus sebagai pihak                        Unless specifically identified as related parties,
        berelasi, maka pihak-pihak lain yang                            the parties disclosed in the Notes to the interim
        disebutkan dalam Catatan atas laporan                           consolidated financial statements are unrelated
        keuangan konsolidasian interim merupakan                        parties.
        pihak tidak berelasi.

   i.   Dana yang Dibatasi Pencairannya                            i.   Restricted Funds

        Deposito berjangka yang jatuh temponya                          Time deposits with maturities of 3 months or
        kurang dari 3 bulan pada saat penempatan                        less at the time of placements which are used
        namun dijaminkan atau dibatasi pencairannya,                    as collateral or are restricted funds, and time
        dan deposito berjangka yang jatuh temponya                      deposits with maturities of more than 3 months
        lebih dari 3 bulan pada saat penempatan                         at the time of placements are presented as
        disajikan sebagai dana yang dibatasi                            restricted funds in the consolidated statement
        pencairannya dalam laporan posisi keuangan                      of financial position.
        konsolidasian.

   j.   Persediaan                                                 j.   Inventories

        Persediaan dinyatakan sebesar nilai yang lebih                  Inventories are valued at the lower of cost or
        rendah antara biaya perolehan atau nilai                        net realizable value. Cost is calculated using
        realisasi bersih. Biaya perolehan ditentukan                    weighted-average method. Net realizable value
        dengan menggunakan metode rata-rata                             is the estimated selling price in the ordinary
        tertimbang. Nilai realisasi bersih persediaan                   course of business, less estimated costs of
        adalah estimasi harga jual dalam kegiatan                       completion and the estimated costs necessary
        usaha biasa dikurangi estimasi biaya                            to make the sale.
        penyelesaian dan estimasi biaya yang
        diperlukan untuk membuat penjualan.

   k.   Biaya Dibayar Dimuka                                       k.   Prepaid Expenses

        Biaya dibayar di muka diamortisasi dan                          Prepaid expenses are amortized and charged
        dibebankan pada operasi selama masa                             to operations over the periods benefited, and
        manfaatnya, dan disajikan sebagai aset lancar                   are presented as current asset or non-current
        atau aset tidak lancar sesuai sifatnya masing-                  asset based on their nature.
        masing.

   l.   Biaya Tangguhan                                            l.   Deferred Charges

        Biaya-biaya tertentu, yang mempunyai masa                       Certain expenditures, which benefits extend
        manfaat lebih dari satu tahun, sehubungan                       over a period of more than one year, relating to
        dengan beban perolehan hak atas tanah yang                      deferred land right acquisition costs that do not
        ditangguhkan dan tidak memenuhi syarat untuk                    fulfil the criteria to be recognized as fixed
        dicatat sebagai aset tetap, ditangguhkan dan                    assets, are deferred and amortized over the
        diamortisasi selama masa manfaatnya dengan                      periods benefited using the straight-line
        menggunakan metode garis lurus. Beban-                          method. These expenditures are presented as
        beban ini disajikan sebagai bagian dari akun                    part of “Other Non-current Assets” account in
        “Aset Tidak Lancar Lainnya” pada laporan                        the consolidated statement of financial position.
        posisi keuangan konsolidasian.




                                                         - 33 -
Page 40
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


   m. Kombinasi Bisnis dan Goodwill                                m. Business Combinations and Goodwill

       Kombinasi bisnis dicatat dengan menggunakan                     Business combinations are accounted for using
       metode akuisisi. Biaya perolehan dari sebuah                    the acquisition method. The cost of an
       akuisisi diukur pada nilai agregat imbalan yang                 acquisition is measured as the aggregate of the
       dialihkan, diukur pada nilai wajar pada tanggal                 consideration transferred, measured at
       akuisisi dan jumlah setiap KNP pada pihak yang                  acquisition date fair value, and the amount of
       diakuisisi. Untuk setiap kombinasi bisnis, Grup                 any NCI in the acquiree. For each business
       memilih apakah mengukur KNP pada entitas                        combination, the Group elects whether it
       yang diakuisisi baik pada nilai wajar ataupun                   measures the NCI in the acquiree either at fair
       pada proporsi kepemilikan KNP atas aset                         value or at the proportionate share of the
       bersih yang teridentifikasi dari entitas yang                   acquiree’s identifiable net assets. Acquisition
       diakuisisi. Biaya-biaya akuisisi yang timbul                    costs incurred are directly expensed and
       dibebankan langsung dan disertakan dalam                        included in administrative expenses.
       beban administrasi.

       Grup menentukan bahwa mereka telah                              The Group determines that it has acquired a
       mengakuisisi bisnis ketika rangkaian aktivitas                  business when the acquired set of activities and
       dan aset yang diakuisisi mencakup input dan                     assets include an input and a substantive
       proses substantif yang bersama-sama secara                      process that together significantly contribute to
       signifikan berkontribusi pada kemampuan                         the ability to create outputs. The acquired
       untuk menghasilkan output. Proses yang                          process is considered substantive if it is critical
       diperoleh adalah substantif jika penting bagi                   to the ability to continue producing outputs, and
       kemampuan untuk terus menghasilkan output,                      the inputs acquired include an organized
       dan input yang diperoleh mencakup tenaga                        workforce with the necessary skills, knowledge,
       kerja yang terorganisir dengan keterampilan,                    or experience to perform that process or it
       pengetahuan,       atau  pengalaman       yang                  significantly contributes to the ability to continue
       diperlukan untuk melakukan proses itu atau                      producing outputs and is considered unique or
       secara     signifikan   berkontribusi     pada                  scarce or cannot be replaced without significant
       kemampuan untuk terus menghasilkan output                       cost, effort, or delay in the ability to continue
       dan dianggap unik atau langka atau tidak dapat                  producing outputs.
       diganti tanpa biaya, usaha, atau penundaan
       yang signifikan dalam kemampuan untuk terus
       menghasilkan output.

       Ketika melakukan akuisisi atas sebuah bisnis,                   When the Group acquires a business, it
       Grup mengklasifikasikan dan menentukan aset                     assesses the financial assets acquired and
       keuangan yang diperoleh dan liabilitas                          liabilities assumed for appropriate classification
       keuangan yang diambil alih berdasarkan pada                     and designation in accordance with the
       persyaratan kontraktual, kondisi ekonomi dan                    contractual terms, economic circumstances
       kondisi terkait lain yang ada pada tanggal                      and pertinent conditions as at the acquisition
       akuisisi.                                                       date.

       Dalam suatu kombinasi bisnis yang dilakukan                     If the business combination is achieved in
       secara bertahap, Grup mengukur kembali                          stages, the acquisition date fair value of the
       kepentingan ekuitas yang dimiliki sebelumnya                    Group’s previously held equity interest in the
       pada pihak yang diakuisisi pada nilai wajar                     acquiree is remeasured to fair value at the
       tanggal akuisisi dan mengakui keuntungan atau                   acquisition date through profit or loss.
       kerugian yang dihasilkan.




                                                         - 34 -
Page 41
PT GOLDEN ENERGY MINES Tbk                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                        unless Otherwise Stated)


       Setiap imbalan kontinjensi yang akan ditransfer                     Any contingent consideration to be transferred
       oleh perusahaan pengakuisisi akan diakui pada                       by the acquirer will be recognized at fair value
       nilai wajar pada tanggal akuisisi. Imbalan                          at    the    acquisition      date.    Contingent
       kontinjensi yang diklasifikasikan sebagai                           consideration classified as equity is not
       ekuitas tidak diukur kembali dan penyelesaian                       remeasured and its subsequent settlement is
       selanjutnya adalah diperhitungkan dalam                             accounted for within equity. Contingent
       ekuitas.      Imbalan      kontinjensi        yang                  consideration classified as an asset or liability
       diklasifikasikan sebagai aset atau liabilitas yaitu                 that is a financial instrument and within the
       instrumen keuangan dan dalam lingkup PSAK                           scope of PSAK No. 109, is measured at fair
       No. 109, diukur pada nilai wajar dengan                             value with the changes in fair value recognized
       perubahan nilai wajar yang diakui dalam laba                        in the statement of profit or loss in accordance
       rugi sesuai dengan PSAK No. 109. Imbalan                            with PSAK No. 109. Other contingent
       kontinjensi lain yang tidak termasuk dalam                          consideration that is not within the scope of
       PSAK No. 109 diukur sebesar nilai wajar pada                        PSAK No. 109 is measured at fair value at each
       setiap tanggal pelaporan dengan perubahan                           reporting date with changes in fair value
       nilai wajar yang diakui pada laba rugi.                             recognized in profit or loss.

       Bila pencatatan awal kombinasi bisnis belum                         If the initial accounting for a business
       dapat diselesaikan pada tanggal pelaporan,                          combination is incomplete by the end of the
       Grup melaporkan jumlah sementara bagi pos                           reporting date, the Group reports provisional
       yang pencatatannya belum dapat diselesaikan                         amounts for the items for which the accounting
       tersebut.                                                           is incomplete.

       Periode pengukuran adalah periode setelah                           The measurement period is the period after the
       tanggal akuisisi yang didalamnya Grup dapat                         acquisition date during which the Group may
       melakukan        penyesuaian      atas     jumlah                   adjust the provisional amounts recognized for a
       sementara yang diakui dalam kombinasi bisnis                        business       combination.          During     the
       tersebut. Selama periode pengukuran, Grup                           measurement period, the Group recognizes
       mengakui penambahan aset atau liabilitas bila                       additional assets or liabilities if new information
       terdapat informasi terbaru yang diperoleh                           is obtained about facts and circumstances that
       mengenai fakta dan keadaan pada tanggal                             existed as of the acquisition date and, if known,
       akuisisi, yang bila diketahui pada saat itu, akan                   would have resulted in the recognition of those
       menyebabkan pengakuan atas aset dan                                 assets and liabilities as of that date.
       liabilitas pada tanggal tersebut.

       Periode pengukuran berakhir pada saat                               The measurement period ends as soon as the
       pengakuisisi      menerima     informasi    yang                    acquirer receives the information it was seeking
       diperlukan mengenai fakta dan keadaan pada                          about facts and circumstances that existed as
       tanggal akuisisi atau mengetahui bahwa                              of the acquisition date or learns that more
       informasi lainnya tidak dapat diperoleh, namun                      information is not obtainable but shall not
       tidak lebih dari satu tahun dari tanggal akuisisi.                  exceed one year from the acquisition date.

       Pada tanggal akuisisi, goodwill awalnya diukur                      At acquisition date, goodwill is initially
       pada harga perolehan yang merupakan selisih                         measured at cost being the excess of the
       lebih nilai agregat dari imbalan yang dialihkan                     aggregate of the consideration transferred and
       dan jumlah setiap KNP atas selisih jumlah dari                      the amount recognized for NCI over the net
       aset teridentifikasi yang diperoleh dan liabilitas                  identifiable assets acquired and liabilities
       yang diambil alih.                                                  assumed.

       Jika imbalan tersebut lebih rendah dari nilai                       If this consideration is lower than the fair value
       wajar aset bersih entitas anak yang diakuisisi,                     of the net assets of the subsidiary acquired, the
       selisih tersebut diakui pada laba rugi sebagai                      difference is recognized in profit or loss as gain
       keuntungan dari pembelian dengan diskon                             on bargain purchase after previously assessing
       setelah sebelumnya manajemen melakukan                              the identification and fair value measurement of
       penilaian atas identifikasi dan nilai wajar dari                    the acquired assets and the assumed liabilities.
       aset yang diperoleh dan liabilitas yang diambil
       alih.




                                                             - 35 -
Page 42
PT GOLDEN ENERGY MINES Tbk                                                               PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                   AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                    Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                               As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                        and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                   March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                         (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                         unless Otherwise Stated)


        Setelah pengakuan awal, goodwill diukur pada                         After initial recognition, goodwill is measured at
        jumlah tercatat dikurangi akumulasi kerugian                         cost less any accumulated impairment losses.
        penurunan nilai. Untuk tujuan pengujian                              For the purpose of impairment testing, goodwill
        penurunan nilai, goodwill yang diperoleh dari                        acquired in a business combination is, from the
        suatu kombinasi bisnis, sejak tanggal akuisisi                       acquisition date, allocated to each of the
        dialokasikan kepada setiap Unit Penghasil Kas                        Group’s Cash Generating Units (CGU) that are
        (UPK) dari Grup yang diharapkan akan                                 expected to benefit from the combination,
        bermanfaat dari sinergi kombinasi tersebut,                          irrespective of whether other assets or liabilities
        terlepas dari apakah aset atau liabilitas lain dari                  of the acquiree are assigned to those CGUs.
        pihak yang diakuisisi ditetapkan atas UPK
        tersebut.

        Jika goodwill telah dialokasikan pada suatu                          Where goodwill forms part of a CGU and part of
        UPK dan operasi tertentu atas UPK tersebut                           the operations within that CGU is disposed of,
        dihentikan, maka goodwill yang diasosiasikan                         the goodwill associated with the operation
        dengan operasi yang dihentikan tersebut                              disposed of is included in the carrying amount
        termasuk dalam jumlah tercatat operasi                               of the operation when determining the gain or
        tersebut ketika menentukan keuntungan atau                           loss on disposal of the operation. Goodwill
        kerugian dari pelepasan. Goodwill yang                               disposed of in this circumstance is measured
        dilepaskan tersebut diukur berdasarkan nilai                         based on the relative values of the operation
        relatif operasi yang dihentikan terhadap bagian                      disposed of and the portion of the CGU
        dari UPK yang ditahan.                                               retained.

        Kombinasi bisnis entitas sepengendali                                Business combinations under common control

        Kombinasi bisnis entitas sepengendali dicatat                        Business combinations under common control
        dengan menggunakan metode penyatuan                                  are accounted for using the pooling-of-interests
        kepentingan, dimana selisih antara jumlah                            method, whereby the difference between the
        imbalan yang dialihkan dengan jumlah tercatat                        considerations transferred and the book value
        aset bersih entitas yang diakuisisi diakui                           of the net assets of the acquiree is recognized
        sebagai bagian dari akun "Tambahan Modal                             as part of "Additional Paid-in Capital" account
        Disetor" pada laporan posisi keuangan                                in the consolidated statement of financial
        konsolidasian.                                                       position.

        Dalam menerapkan metode penyatuan                                    In applying the said pooling-of-interest method,
        kepentingan tersebut, unsur-unsur laporan                            the components of the financial statements of
        keuangan dari entitas yang bergabung                                 the combining entities are presented as if the
        disajikan seolah-olah penggabungan tersebut                          combination has occurred since the beginning
        telah terjadi sejak awal periode entitas yang                        of the period of the combining entity become
        bergabung berada dalam kesepengendalian.                             under common control.

   n.   Aset Tetap                                                      n.   Property and Equipment

        Seluruh aset tetap awalnya diakui sebesar                            All property and equipment are initially
        biaya perolehan, yang terdiri atas harga                             recognized at cost, which comprises the
        perolehan dan biaya-biaya tambahan yang                              purchase price and any costs directly
        dapat diatribusikan langsung untuk membawa                           attributable in bringing the assets to the location
        aset ke lokasi dan kondisi yang diinginkan                           and condition necessary for the assets to be
        supaya aset tersebut siap digunakan sesuai                           capable of operating in the manner intended by
        dengan maksud manajemen.                                             management.

        Setelah pengakuan awal, aset tetap dinyatakan                        Subsequent to initial recognition, property and
        pada biaya perolehan dikurangi akumulasi                             equipment are carried at cost less any
        penyusutan dan akumulasi rugi penurunan                              subsequent accumulated depreciation and
        nilai.                                                               impairment losses.




                                                              - 36 -
Page 43
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


       Penyusutan dimulai pada saat aset tersebut                           Depreciation starts when the assets are
       siap untuk digunakan sesuai maksud                                   available for use and is computed using the
       penggunaannya     dan   dihitung   dengan                            straight-line method based on the estimated
       menggunakan metode garis lurus berdasarkan                           useful lives of the assets as follows:
       estimasi umur manfaat ekonomis sebagai
       berikut:

                                                            Tahun/Years
       Bangunan                                                    5 - 20          Buildings
       Infrastruktur                                                 10            Infrastructure
       Mesin dan alat berat                                        4 - 16          Machinery and heavy equipment
       Transportasi dan peralatan lainnya                           4-8            Transportation and other equipment
       Perabotan dan perlengkapan kantor                            4-8            Office furniture and fixtures
       Prasarana                                                     3             Leasehold improvements

       Jumlah tercatat aset ini direviu atas penurunan                      The carrying amounts of these assets are
       nilai jika terdapat peristiwa atau perubahan                         reviewed for impairment when events or
       keadaan yang mengindikasikan bahwa jumlah                            changes in circumstances indicate that their
       tercatat mungkin tidak dapat seluruhnya                              carrying values may not be fully recoverable.
       terealisasi.

       Jumlah tercatat komponen dari suatu aset                             The carrying amount of an item of these assets
       dihentikan pengakuannya pada saat dilepaskan                         is derecognized upon disposal or when no
       atau saat sudah tidak ada lagi manfaat ekonomi                       future economic benefits are expected from its
       masa depan yang diharapkan dari penggunaan                           use or disposal. Any gain or loss arising from
       maupun pelepasannya. Keuntungan atau                                 the derecognition of the asset (calculated as
       kerugian yang timbul dari penghentian                                the difference between the net disposal
       pengakuan tersebut (ditentukan sebesar selisih                       proceeds and the carrying amount of the asset)
       antara jumlah hasil pelepasan bersih dan                             is directly included in the profit or loss of year
       jumlah tercatatnya) dimasukkan ke dalam laba                         the item is derecognized.
       rugi pada tahun penghentian pengakuan
       tersebut dilakukan.

       Nilai residu aset, umur manfaat dan metode                           The asset residual values, useful lives and
       penyusutan dievaluasi setiap akhir tahun                             depreciation method are reviewed at the end of
       pelaporan dan disesuaikan secara prospektif                          each reporting year and adjusted prospectively
       jika dipandang perlu.                                                if necessary.

       Aset tetap dalam penyelesaian dicatat sebesar                        Constructions in-progress are stated at cost,
       biaya perolehan, yang mencakup kapitalisasi                          including capitalized borrowing costs and other
       beban pinjaman dan biaya-biaya lainnya yang                          charges incurred in connection with the
       terjadi sehubungan dengan pendanaan aset                             financing of the said asset constructions. The
       tetap dalam penyelesaian tersebut. Akumulasi                         accumulated costs will be reclassified to the
       biaya perolehan akan direklasifikasi ke akun                         appropriate “Property and Equipment” account
       “Aset Tetap” yang bersangkutan pada saat aset                        when the construction is completed. Assets
       tetap tersebut telah selesai dikerjakan dan siap                     under construction are not depreciated until
       untuk     digunakan.     Aset     tetap   dalam                      they fulfill criteria for recognition as property
       penyelesaian      tidak   disusutkan     sampai                      and equipment as disclosed above.
       memenuhi syarat pengakuan sebagai aset
       tetap seperti diungkapkan di atas.




                                                          - 37 -
Page 44
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


        Beban       pemeliharaan    dan     perbaikan                     Repairs and maintenance expenses are taken
        dibebankan pada laba rugi pada saat                               to the profit or loss when they are incurred. The
        terjadinya.    Beban      pemugaran        dan                    cost of major renovation and restoration is
        penambahan dalam jumlah besar dikapitalisasi                      included in the carrying amount of the related
        kepada jumlah tercatat aset terkait bila besar                    asset when it is probable that future economic
        kemungkinan bagi Grup manfaat ekonomi                             benefits in excess of the originally assessed
        masa depan menjadi lebih besar dari standar                       standard of performance of the existing asset
        kinerja awal yang ditetapkan sebelumnya dan                       will flow to the Group and is depreciated over
        disusutkan sepanjang sisa masa manfaat aset                       the remaining useful life of the related asset.
        terkait.

        Tanah termasuk biaya pengurusan legal hak                         Land including legal cost of land rights in the
        atas tanah dalam bentuk Hak Guna Usaha                            form of Right to Cultivate (Hak Guna Usaha or
        (HGU), Hak Guna Bangunan (HGB) dan Hak                            HGU), Right to Build (Hak Guna Bangunan or
        Pakai (HP) ketika tanah diperoleh pertama kali                    HGB) and Right to Use (Hak Pakai or HP) when
        dinyatakan sebesar biaya perolehan dan tidak                      the land rights were acquired initalliy are stated
        diamortisasi karena manajemen berpendapat                         at cost and not amortized as the management’s
        bahwa kemungkinan besar hak atas tanah                            opinion that it is probable the titles of land rights
        tersebut dapat diperbaharui/ diperpanjang pada                    can be renewed/extended upon expiration.
        saat masa berlakunya selesai.

        Biaya pengurusan atas perpanjangan atau                           The extension or the legal renewal costs of land
        pembaruan legal hak atas tanah dalam bentuk                       rights in the form of HGU, HGB and HP are
        HGU, HGB dan HP ditangguhkan dan                                  deferred and amortized over the shorter
        diamortisasi yang lebih pendek antara umur                        between the land rights' legal life and the
        hukum hak atas tanah dan umur ekonomi                             economic life of the land, and presented as part
        tanah, dan disajikan sebagai bagian dari akun                     of “Other Non-current Assets” account in the
        “Aset Tidak Lancar Lainnya” pada laporan                          consolidated statement of financial position.
        posisi keuangan konsolidasian.

   o.   Aset Tidak Berwujud                                          o.   Intangible Assets

        Aset tidak berwujud yang diperoleh secara                         Intangible assets acquired separately are
        terpisah diukur pada pengakuan awal sebesar                       measured on initial recognition at cost. The cost
        biaya perolehan. Biaya perolehan aset tidak                       of intangible assets acquired in a business
        berwujud yang diperoleh dalam kombinasi                           combination is their fair value at the date of
        bisnis adalah nilai wajarnya pada tanggal                         acquisition. Following initial recognition,
        akuisisi. Setelah pengakuan awal, aset tidak                      intangible assets are carried at cost less any
        berwujud dicatat sebesar biaya perolehan                          accumulated amortisation and accumulated
        dikurangi akumulasi amortisasi dan akumulasi                      impairment losses. Internally generated
        kerugian penurunan nilai. Aset tak berwujud                       intangibles, excluding capitalized development
        yang dihasilkan secara internal, tidak termasuk                   costs, are not capitalized and the related
        biaya pengembangan yang dikapitalisasi, tidak                     expenditure is reflected in profit or loss in the
        dikapitalisasi dan pengeluaran terkait tercermin                  period in which the expenditure is incurred.
        dalam laba rugi pada periode pengeluaran
        tersebut terjadi.

        Masa manfaat aset tidak berwujud dinilai                          The useful lives of intangible assets are
        sebagai terbatas atau tidak terbatas.                             assessed as either finite or indefinite.




                                                           - 38 -
Page 45
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


        Aset tidak berwujud dengan umur yang terbatas                     Intangible assets with finite lives are amortized
        diamortisasi selama masa manfaat ekonomi                          over the useful economic life and assessed for
        dan dinilai penurunan nilainya setiap kali                        impairment whenever there is an indication that
        terdapat indikasi bahwa aset tidak berwujud                       the intangible asset may be impaired. The
        mungkin mengalami penurunan nilai. Periode                        amortisation period and the amortisation
        amortisasi dan metode amortisasi untuk aset                       method for an intangible asset with a finite
        tidak berwujud dengan masa manfaat terbatas                       useful life are reviewed at least at the end of
        ditelaah setidaknya pada setiap akhir periode                     each reporting period. Changes in the expected
        pelaporan. Perubahan masa manfaat yang                            useful life or the expected pattern of
        diharapkan atau pola konsumsi yang                                consumption of future economic benefits
        diharapkan dari manfaat ekonomi masa depan                        embodied in the asset are considered to modify
        yang terkandung dalam aset dianggap                               the amortisation period or method, as
        memodifikasi periode atau metode amortisasi,                      appropriate, and are treated as changes in
        jika sesuai, dan diperlakukan sebagai                             accounting estimates. The amortisation
        perubahan      estimasi   akuntansi.   Beban                      expense on intangible assets with finite lives is
        amortisasi atas aset takberwujud dengan umur                      recognized in the consolidated statement of
        terbatas diakui dalam laporan laba rugi                           profit or loss in the expense category that is
        konsolidasian dalam kategori beban yang                           consistent with the function of the intangible
        sesuai dengan fungsi aset takberwujud                             assets.
        tersebut.

        Aset takberwujud dengan masa manfaat tidak                        Intangible assets with indefinite useful lives are
        terbatas tidak diamortisasi, tetapi diuji                         not amortized, but are tested for impairment
        penurunan nilainya setiap tahun, baik secara                      annually, either individually or at the cash-
        individual maupun pada tingkat unit penghasil                     generating unit level. The assessment of
        kas. Penilaian kehidupan tidak terbatas ditinjau                  indefinite life is reviewed annually to determine
        setiap tahun untuk menentukan apakah                              whether the indefinite life continues to be
        kehidupan tidak terbatas terus dapat didukung.                    supportable. If not, the change in useful life
        Jika tidak, perubahan masa manfaat dari tidak                     from indefinite to finite is made on a prospective
        terbatas menjadi terbatas dilakukan secara                        basis.
        prospektif.

        Aset tidak berwujud dihentikan pengakuannya                       An intangible asset is derecognized upon
        pada saat pelepasan (yaitu, pada tanggal                          disposal (i.e., at the date the recipient obtains
        penerima memperoleh kendali) atau ketika                          control) or when no future economic benefits
        tidak ada manfaat ekonomi masa depan yang                         are expected from its use or disposal. Any gain
        diharapkan     dari     penggunaan     atau                       or loss arising upon derecognition of the asset
        pelepasannya. Keuntungan atau kerugian yang                       (calculated as the difference between the net
        timbul dari penghentian pengakuan aset                            disposal proceeds and the carrying amount of
        (dihitung sebagai perbedaan antara hasil                          the asset) is included in the consolidated
        pelepasan bersih dan jumlah tercatat aset)                        statement of profit or loss.
        dimasukkan dalam laporan laba rugi
        konsolidasian.

        Masa manfaat aset tidak berwujud dinilai                          The useful lives of intangible assets are
        sebagai terbatas atau tidak terbatas.                             assessed as either finite or indefinite.

   p.   Aset Pertambangan                                            p.   Mine Properties

        Pengeluaran sebelum perolehan izin                                Pre-license costs

        Pengeluaran      yang  dilakukan   sebelum                        Pre-license costs are expensed in the period in
        perolehan izin penambangan dibebankan pada                        which they are incurred.
        saat terjadinya.




                                                           - 39 -
Page 46
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


       Pengeluaran untuk eksplorasi dan evaluasi                        Exploration and evaluation expenditures

       Pengeluaran untuk eksplorasi dan evaluasi                        Exploration and evaluation expenditures are
       dikapitalisasi dan diakui sebagai “aset                          capitalized and recognized as “exploration and
       eksplorasi dan evaluasi” untuk setiap daerah                     evaluation assets” for each area of interest
       pengembangan (area of interest) apabila izin                     when mining rights are obtained and still valid
       pertambangan telah diperoleh dan masih                           and: (i) the costs are expected to be recouped
       berlaku dan: (i) biaya tersebut diharapkan dapat                 through      successful     development         and
       diperoleh kembali melalui keberhasilan                           exploitation of the area of interest; or (ii) where
       pengembangan dan eksploitasi daerah                              activities in the area of interest have not
       pengembangan; atau (ii) apabila kegiatan                         reached the stage that allow a reasonable
       tersebut belum mencapai tahap yang                               assessment of the existence of economically
       memungkinkan untuk menentukan adanya                             recoverable reserves, and active and
       cadangan terbukti yang secara ekonomis dapat                     significant operations in, or in relation to, the
       diperoleh, serta kegiatan yang aktif dan                         area of interest are continuing. These
       signifikan, dalam daerah pengembangan (area                      expenditures include materials and fuel used,
       of interest) terkait masih berlangsung.                          surveying costs, drilling and stripping costs
       Pengeluaran ini meliputi penggunaan bahan                        before the commencement of production stage
       pembantu dan bahan bakar, biaya survei, biaya                    and payments made to contractors.
       pengeboran dan pengupasan tanah sebelum
       dimulainya tahap produksi dan pembayaran
       kepada kontraktor.

       Setelah pengakuan awal, aset eksplorasi dan                      Exploration and evaluation assets are
       evaluasi dicatat menggunakan model biaya dan                     subsequently measured using cost model and
       diklasifikasikan sebagai aset berwujud, kecuali                  classified as tangible assets, unless they are
       memenuhi syarat untuk diakui sebagai aset                        qualified to be recognized as intangible assets.
       takberwujud.

       Pemulihan aset eksplorasi dan evaluasi                           The ultimate recoupment of deferred
       tergantung pada keberhasilan pengembangan                        exploration and evaluation expenditure is
       dan       eksploitasi   komersial      daerah                    dependent upon successful development and
       pengembangan (area of interest) tersebut. Aset                   commercial exploitation of the related area of
       eksplorasi dan evaluasi diuji untuk penurunan                    interest. Exploration and evaluation assets
       nilai bila fakta dan kondisi mengindikasikan                     shall be assessed for impairment when facts
       bahwa jumlah tercatatnya mungkin melebihi                        and circumstances suggest that the carrying
       jumlah terpulihkannya. Dalam keadaan                             amount of an exploration and evaluation asset
       tersebut, maka entitas harus mengukur,                           may exceed its recoverable amount. In such a
       menyajikan      dan   mengungkapkan        rugi                  case, an entity shall measure, present and
       penurunan nilai terkait sesuai dengan                            disclose any resulting impairment loss in
       PSAK No. 236, “Penurunan Nilai Aset”.                            accordance with PSAK No. 236, “Impairment of
                                                                        Assets”.

       Aset eksplorasi dan evaluasi ditransfer ke                       Exploration and evaluation assets are
       “Tambang dalam pengembangan” pada akun                           transferred to “Mines under construction” in the
       “Aset pertambangan” setelah ditetapkan bahwa                     “Mine properties” account after the mines are
       tambang memiliki nilai ekonomis untuk                            determined to be economically viable to be
       dikembangkan.                                                    developed.




                                                          - 40 -
Page 47
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


       Pengeluaran  untuk           tambang       dalam                   Expenditures for mine under construction
       pengembangan

       Pengeluaran        untuk      tambang       dalam                  Expenditures for mines under construction and
       pengembangan dan biaya-biaya lain yang                             incorporated costs in developing an area of
       terkait dengan pengembangan suatu area of                          interest subsequent to the transfer from
       interest setelah transfer dari aset eksplorasi dan                 exploration and evaluation assets but prior to
       evaluasi namun sebelum dimulainya tahap                            the commencement of production stage in the
       produksi pada area yang bersangkutan,                              respective area, are capitalized to “Mines under
       dikapitalisasi      ke      “Tambang        dalam                  construction” as long as they meet the
       pengembangan” sepanjang memenuhi kriteria                          capitalization criteria.
       kapitalisasi.

       Tambang pada tahap produksi                                        Producing mines

       Pada saat tambang dalam pengembangan                               Upon completion of mine construction and the
       diselesaikan dan tahap produksi dimulai,                           production stage is commenced, the “Mines
       “Tambang dalam pengembangan” ditransfer ke                         under construction” are transferred into
       “Tambang pada tahap produksi” pada akun                            “Producing mines” in the “Mine Properties”
       “Aset pertambangan”, yang dicatat pada nilai                       account, which are stated at cost, less
       perolehan, dikurangi deplesi dan akumulasi                         depletion and accumulated impairment losses.
       penurunan nilai.

       Deplesi tambang pada tahap produksi adalah                         Depletion of producing mines is based on unit-
       berdasarkan metode unit produksi sejak daerah                      of-production method from the date of
       pengembangan (area of interest) tersebut telah                     commercial production of the respective area of
       berproduksi secara komersial, selama periode                       interest over the lesser of the life of the mine
       waktu yang lebih pendek antara umur tambang                        and the remaining terms of CCoW or IUP.
       dan sisa berlakunya PKP2B atau IUP.

       Biaya pengupasan lapisan tanah                                     Stripping costs

       Biaya pengupasan lapisan tanah adalah biaya                        Stripping costs are the costs of removing
       atas aktivitas memindahkan material sisa                           overburden from a mine. Stripping costs
       tambang. Biaya pengupasan lapisan tanah                            incurred in the development of a mine before
       yang timbul pada tahap pengembangan                                production commences are capitalized as part
       tambang sebelum dimulainya tahap produksi                          of the cost of developing the mine, and are
       dikapitalisasi sebagai bagian dari biaya                           subsequently depreciated or amortized using a
       pengembangan      tambang,   dan    setelah                        unit-of-production method on the basis of
       pengakuan awal akan disusutkan atau                                proven and probable reserves, once production
       diamortisasi menggunakan metode unit                               starts.
       produksi berdasarkan estimasi cadangan
       terbukti dan terduga pada saat produksi
       dimulai.




                                                            - 41 -
Page 48
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


       Aktivitas pengupasan lapisan tanah yang terjadi                    Stripping activity conducted during the
       selama tahap produksi mungkin memiliki dua                         production phase may provide two benefits:
       manfaat: (i) bijih yang dapat diproses untuk                       (i) ore that is processed into inventory in the
       menjadi persediaan dalam periode berjalan dan                      current period and (ii) improved access to the
       (ii) meningkatkan akses ke badan bijih di                          ore body in future periods. To the extent that
       periode berikutnya. Sepanjang manfaat dari                         benefit from the stripping activity is realized in
       aktivitas pengupasan lapisan tanah dapat                           the from of inventory produced, the Group
       direalisasikan dalam bentuk persediaan yang                        accounts for the costs of that stripping activity
       diproduksi dalam periode tersebut, Grup                            in accordance with PSAK No. 202,
       mencatat biaya atas aktivitas pengupasan                           “Inventories”. To the extent the benefit
       lapisan tanah sesuai dengan PSAK No. 202,                          improved access to ore, the Group recognizes
       “Persediaan”. Sepanjang biaya pengupasan                           these costs as a stripping activity asset, if, and
       lapisan tanah tahap produksi yang timbul                           only if, all the following criteria are met:
       dengan manfaat peningkatan akses menuju
       bijih di periode yang akan datang, Grup
       mencatat biaya tersebut sebagai aset aktivitas
       pengupasan lapisan tanah jika dan hanya jika,
       seluruh kriteria berikut terpenuhi:

       •   besar kemungkinan bahwa manfaat                                •   it is probable that the future economic
           ekonomis masa depan (peningkatan akses                             benefits (improved access to the ore body)
           menuju badan bijih (ore body) yang terkait                         associated with the stripping activity will
           dengan aktivitas pengupasan lapisan                                flow to the entity;
           tanah akan mengalir kepada entitas;

       •   entitas dapat mengidentifikasi komponen                        •   the entity can identify the component of the
           badan bijih yang aksesnya telah                                    ore body for which access has been
           ditingkatkan; dan                                                  improved; and

       •   biaya yang terkait dengan aktivitas                            •   the costs relating to the stripping activity
           pengupasan lapisan tanah atas komponen                             associated with that component can be
           tersebut dapat diukur secara andal                                 measured reliably.

       Aset aktivitas pengupasan lapisan tanah pada                       The stripping activity asset is initially measured
       awalnya diukur pada biaya perolehan, biaya ini                     at cost, which is the accumulation of costs
       merupakan akumulasi dari biaya-biaya yang                          directly incurred to perform the stripping activity
       secara langsung terjadi untuk melakukan                            that improves access to the identified
       aktivitas pengupasan lapisan tanah yang                            component of ore body, plus an allocation of
       meningkatkan akses terhadap komponen                               directly attributable overhead costs. If incidental
       badan bijih teridentifikasi, ditambah alokasi                      operations are occurring at the same time as
       biaya overhead yang diatribusikan secara                           the production stripping activity, but are not
       langsung. Jika aktivitas insidentil terjadi pada                   necessary for the production stripping activity to
       saat yang bersamaan dengan pengupasan                              continue as planned, the costs associated with
       lapisan tanah tahap produksi, namun aktivitas                      these incidental operations are not included in
       insidentil tersebut tidak harus ada untuk                          the cost of the stripping activity asset.
       melanjutkan aktivitas pengupasan lapisan
       tanah sebagaimana direncanakan, biaya yang
       terkait dengan aktivitas insidentil tersebut tidak
       dapat dimasukkan sebagai biaya perolehan
       aset aktivitas pengupasan lapisan tanah.




                                                            - 42 -
Page 49
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


       Ketika biaya perolehan aset aktivitas                             When the costs of the stripping activity asset
       pengupasan lapisan tanah dan persediaan                           and the inventory produced are not separately
       yang diproduksi tidak dapat diidentifikasi secara                 identifiable, the Group allocates the production
       terpisah,     Grup     mengalokasikan       biaya                 stripping asset by using an allocation basis that
       pengupasan lapisan tanah dalam tahap                              is based on a relevant production measure.
       produksi antara persediaan yang diproduksi                        This production measure is calculated for the
       dan aset aktivitas pengupasan lapisan tanah                       identified component of the ore body, and is
       menggunakan dasar alokasi berdasarkan                             used as a benchmark to identify the extent to
       ukuran produksi yang relevan. Ukuran produksi                     which the additional activity of creating a future
       tersebut dihitung untuk komponen badan bijih                      benefit has taken place. The Group uses the
       teridentifikasi, dan digunakan sebagai patokan                    actual versus expected volume of waste
       untuk mengidentifikasi sejauh mana aktivitas                      extracted.
       tambahan yang menciptakan manfaat di masa
       depan telah terjadi. Grup menggunakan volume
       aktual dibandingkan ekspektasi volume sisa
       yang diekstrak.

       Setelah pengakuan awal, aset aktivitas                            Subsequently, the stripping activity asset is
       pengupasan       lapisan      tanah    dicatat                    carried at cost less depreciation or amortization
       menggunakan biaya perolehan dikurangi                             and any impairment losses, if any. The stripping
       dengan penyusutan atau amortisasi dan rugi                        activity asset is depreciated or amortized using
       penurunan nilai, jika ada. Aset aktivitas                         the units of production method over the
       pengupasan lapisan tanah disusutkan atau                          expected useful life of the identified component
       diamortisasi menggunakan metode unit                              if the ore body that becomes more accessible
       produksi selama masa manfaat dari komponen                        as a result of the stripping activity unless
       badan bijih yang teridentifikasi yang menjadi                     another method is appropriate.
       lebih mudah diakses sebagai akibat dari
       aktivitas lapisan pengupasan tanah, kecuali
       terdapat metode lain yang lebih tepat.

       Aset pertambangan dari kombinasi bisnis                           Mine properties from business combination

       Aset pertambangan dari kombinasi bisnis                           Mine properties from business combination
       merupakan penyesuaian nilai wajar aset                            represent the fair value adjustment of mine
       pertambangan yang diperoleh pada tanggal                          properties acquired at the date of acquisition
       akuisisi dan dinyatakan sebesar harga                             and are stated at cost. Mine properties are
       perolehan. Aset pertambangan diamortisasi                         amortized over the life of the property using the
       selama umur manfaat properti menggunakan                          units of production method from the date of the
       metode unit produksi, mulai sejak tanggal                         acquisition based on estimated reserves. The
       akuisisi dengan menggunakan basis estimasi                        useful life of mine properties pertaining to
       cadangan. Umur manfaat aset pertambangan                          contractual rights is not longer than the validity
       yang timbul dari hak kontraktual tidak lebih lama                 period of such rights, except if the contractual
       dari masa hak kontraktual tersebut, kecuali jika                  rights can be renewed upon expiration without
       hak kontraktual dapat diperbarui dengan tidak                     incurring significant costs for such renewal.
       menimbulkan biaya yang signifikan. Perubahan                      Changes in estimated reserves are accounted
       dalam estimasi cadangan dilakukan secara                          for on a prospective basis, from the beginning
       prospektif, dimulai sejak awal periode                            of the period in which the changes occurs.
       terjadinya perubahan.

       Perusahaan mengakui pajak tangguhan yang                          The Company recognized the deferred tax
       timbul dari aset pertambangan dari kombinasi                      arising from mine properties from the business
       bisnis.                                                           combination.




                                                           - 43 -
Page 50
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


   q.   Penurunan Nilai Aset Non-keuangan                             q.   Impairment of Non-financial Assets

        Pada setiap akhir tahun pelaporan, Grup                            The Group assesses at the end of each
        menilai apakah terdapat indikasi suatu aset                        reporting year whether there is an indication
        mengalami penurunan nilai. Jika terdapat                           that an asset may be impaired. If any such
        indikasi tersebut atau pada saat pengujian                         indication exists or when annual impairment
        penurunan nilai aset (yaitu aset takberwujud                       testing for an asset (i.e. an intangible asset with
        dengan umur manfaat tidak terbatas, aset                           an indefinite useful life, an intangible asset not
        takberwujud yang belum dapat digunakan, atau                       yet available for use, or goodwill acquired in a
        goodwill yang diperoleh dalam suatu kombinasi                      business combination) is required, the Group
        bisnis) diperlukan, maka Grup membuat                              makes an estimate of the asset’s recoverable
        estimasi formal jumlah terpulihkan aset                            amount.
        tersebut.

        Jumlah terpulihkan yang ditentukan untuk aset                      An asset’s recoverable amount is the higher of
        individual adalah jumlah yang lebih tinggi antara                  an asset’s or CGU’s fair value less costs to sell
        nilai wajar aset atau UPK dikurangi biaya untuk                    and its value in use, and is determined for an
        menjual dengan nilai pakainya, kecuali aset                        individual asset, unless the asset does not
        tersebut tidak menghasilkan arus kas masuk                         generate cash inflows that are largely
        yang sebagian besar independen dari aset atau                      independent of those from other assets or
        kelompok aset lain. Jika nilai tercatat aset atau                  groups of assets. Where the carrying amount of
        UPK       lebih    besar    daripada       jumlah                  an asset or CGU exceeds its recoverable
        terpulihkannya,      maka       aset     tersebut                  amount, the asset is considered impaired and
        dipertimbangkan mengalami penurunan nilai                          is written down to its recoverable amount.
        dan nilai tercatat aset diturunkan menjadi
        sebesar jumlah terpulihkannya.

        Grup mendasarkan perhitungan penurunan                             The Group bases its impairment calculation on
        nilai pada rincian perhitungan anggaran atau                       detailed budgets and forecast calculations
        prakiraan yang disusun secara terpisah untuk                       which are prepared separately for each of the
        masing-masing UPK Grup atas aset individual                        Group’s CGUs to which the individual assets
        yang dialokasikan. Perhitungan anggaran dan                        are allocated. These budgets and forecast
        prakiraan ini secara umum mencakup periode                         calculations are generally covering a period of
        selama lima atau sepuluh tahun sesuai dengan                       five or ten years in accordance with the stability
        stabilitas arus kas perkebunan terkait. Setelah                    of each estate’s cash flows. Beyond the
        periode yang dianggarkan proyeksi arus kas                         forecasted period, the estimated cash flows are
        diestimasi dengan melakukan ekstrapolasi                           determined by extrapolating the forecasted
        proyeksi      yang     dianggarkan      dengan                     cash flows using a steady long-term growth
        menggunakan tingkat pertumbuhan jangka                             rate.
        panjang yang tetap.

        Dalam menghitung nilai pakai, estimasi arus                        In assessing the value in use, the estimated net
        kas masa depan bersih didiskontokan ke nilai                       future cash flows are discounted to their
        kini dengan menggunakan tingkat diskonto                           present value using a pre-tax discount rate that
        sebelum pajak yang menggambarkan penilaian                         reflects current market assessments of the time
        pasar kini dari nilai waktu uang dan risiko                        value of money and the risks specific to the
        spesifik atas aset. Dalam menentukan nilai                         asset. In determining fair value less costs to
        wajar dikurangi biaya untuk menjual, digunakan                     sell, recent market transactions are taken into
        harga penawaran pasar terakhir, jika tersedia.                     account, if available. If no such transactions
        Jika tidak terdapat transaksi tersebut, Grup                       can be identified, an appropriate valuation
        menggunakan model penilaian yang sesuai                            model is used to determine the fair value of the
        untuk    menentukan       nilai wajar     aset.                    assets. These calculations are corroborated by
        Perhitungan-perhitungan ini dikuatkan oleh                         valuation multiples or other available fair value
        penilaian berganda atau indikator nilai wajar                      indicators.
        yang tersedia.




                                                            - 44 -
Page 51
PT GOLDEN ENERGY MINES Tbk                                                               PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                   AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                    Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                               As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                        and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                   March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                         (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                         unless Otherwise Stated)


        Kerugian penurunan nilai dari operasi yang                           Impairment losses of continuing operations, if
        berkelanjutan, jika ada, diakui pada laba rugi                       any, are recognized in the profit or loss in those
        sesuai dengan kategori biaya yang konsisten                          expense categories consistent with the
        dengan fungsi dari aset yang diturunkan                              functions of the impaired asset.
        nilainya.

        Untuk aset selain goodwill, penilaian dilakukan                      For assets excluding goodwill, an assessment
        pada akhir setiap tanggal pelaporan apakah                           is made at each reporting date as to whether
        terdapat indikasi bahwa rugi penurunan nilai                         there is any indication that previously
        yang telah diakui dalam tahun sebelumnya                             recognized impairment losses may no longer
        mungkin tidak ada lagi atau mungkin telah                            exist or may have decreased. If such indication
        menurun. Jika indikasi dimaksud ditemukan,                           exists, the asset’s or CGU’s recoverable
        maka entitas mengestimasi jumlah terpulihkan                         amount is estimated. A previously recognized
        aset atau UPK tersebut. Kerugian penurunan                           impairment loss for an asset other than goodwill
        nilai yang telah diakui dalam periode                                is reversed only if there has been a change in
        sebelumnya untuk aset selain goodwill dibalik                        the assumptions used to determine the asset’s
        hanya jika terdapat perubahan asumsi-asumsi                          recoverable amount since the last impairment
        yang digunakan untuk menentukan jumlah                               loss was recognized. If that is the case, the
        terpulihkan aset tersebut sejak rugi penurunan                       carrying amount of the asset is increased to its
        nilai terakhir diakui. Dalam hal ini, jumlah                         recoverable amount.
        tercatat    aset     dinaikkan    ke      jumlah
        terpulihkannya.

        Pembalikan tersebut dibatasi sehingga jumlah                         The reversal is limited so that the carrying
        tercatat   aset     tidak    melebihi      jumlah                    amount of the assets does not exceed its
        terpulihkannya maupun jumlah tercatat, neto                          recoverable amount, nor exceed the carrying
        setelah penyusutan, seandainya tidak ada rugi                        amount that would have been determined, net
        penurunan nilai yang telah diakui untuk aset                         of depreciation, had no impairment loss been
        tersebut pada periode/tahun sebelumnya.                              recognized for the asset in prior periods/years.
        Pembalikan rugi penurunan nilai diakui pada                          Reversal of an impairment loss is recognized in
        laba rugi. Setelah pembalikan tersebut,                              the profit or loss. After such a reversal, the
        penyusutan aset tersebut disesuaikan di                              depreciation charge on the said asset is
        periode mendatang untuk mengalokasikan                               adjusted in future periods to allocate the asset’s
        jumlah tercatat aset yang direvisi, dikurangi nilai                  revised carrying amount, less any residual
        sisanya, dengan dasar yang sistematis selama                         value, on a systematic basis over its remaining
        sisa umur manfaatnya.                                                useful life.

        Goodwill diuji untuk penurunan nilai setiap                          Goodwill is tested for impairment annually and
        tahun dan ketika terdapat indikasi bahwa nilai                       when circumstances indicate that the carrying
        tercatatnya mungkin mengalami penurunan                              value may be impaired. Impairment is
        nilai. Penurunan nilai bagi goodwill ditetapkan                      determined for goodwill by assessing the
        dengan menentukan jumlah tercatat tiap UPK                           recoverable amount of each CGU (or group of
        (atau kelompok UPK) terkait dari goodwill                            CGUs) to which the goodwill relates. Where the
        tersebut. Jika jumlah terpulihkan UPK kurang                         recoverable amount of the CGU is less than
        dari jumlah tercatatnya, rugi penurunan nilai                        their carrying amount, an impairment loss is
        diakui. Rugi penurunan nilai terkait goodwill                        recognized. Impairment losses relating to
        tidak dapat dibalik pada tahun berikutnya.                           goodwill cannot be reversed in future years.

   r.   Imbalan Kerja Karyawan                                          r.   Employee Benefits

        Grup mengakui kewajiban imbalan kerja sesuai                         The Group recognizes employee benefits
        dengan Undang-undang Ketenagakerjaan yang                            liability in accordance with the applicable Labor
        berlaku.                                                             Law.




                                                              - 45 -
Page 52
PT GOLDEN ENERGY MINES Tbk                                                                PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                     Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                         and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                    March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                          (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                          unless Otherwise Stated)


        Pengukuran kembali, terdiri atas keuntungan                           Re-measurements, comprising of actuarial
        dan kerugian aktuarial, segera diakui pada                            gains and losses, are recognized immediately
        laporan posisi keuangan konsolidasian dengan                          in the consolidated statement of financial
        pengaruh langsung didebit atau dikreditkan                            position with a corresponding debit or credit to
        kepada saldo laba melalui PKL pada periode                            retained earnings through OCI in the period in
        terjadinya.    Pengukuran    kembali    tidak                         which they occur. Re-measurements are not
        direklasifikasi ke laba rugi pada periode                             reclassified to profit or loss in subsequent
        berikutnya.                                                           periods.

        Biaya jasa lalu harus diakui sebagai beban                            Past service costs are recognized in profit or
        pada saat yang lebih awal antara:                                     loss at the earlier between:

        i.    Ketika    program      amendemen     atau                       i.    The date of the plan amendment or
              kurtailmen terjadi; dan                                               curtailment; and
        ii.   Ketika Grup mengakui biaya restrukturisasi                      ii.   The date of the Group recognizes the
              atau imbalan terminasi terkait.                                       restructuring costs.

        Bunga bersih dihitung dengan menerapkan                               Net interest is calculated by applying the
        tingkat diskonto yang digunakan terhadap                              discount rate to the net defined benefit liability.
        liabilitas imbalan kerja. Grup mengakui                               The Group recognizes the following changes in
        perubahan berikut pada kewajiban obligasi neto                        the net defined benefit obligation under “Cost of
        pada akun “Beban Pokok Penjualan” dan                                 Revenues” and “General and Administrative
        “Beban Umum dan Administrasi” pada laporan                            Expenses” as appropriate in the consolidated
        laba rugi dan penghasilan komprehensif lain                           statement of profit or loss and other
        konsolidasian:                                                        comprehensive income:

        i.    Biaya jasa terdiri atas biaya jasa kini, biaya                  i.    Service costs comprising current service
              jasa lalu, keuntungan atau kerugian atas                              costs, past-service costs, gains or losses
              penyelesaian (curtailment) tidak rutin, dan                           on     curtailments    and     non-routine
                                                                                    settlements, and
        ii.   Beban atau pendapatan bunga bersih.                             ii.   Net interest expense or income.

   s.   Provisi                                                          s.   Provision

        Provisi diakui jika Grup memiliki kewajiban kini                      Provisions are recognized when the Group has
        (baik bersifat hukum maupun bersifat                                  a present obligation (legal or constructive)
        konstruktif) yang akibat peristiwa masa lalu,                         where, as a result of a past event, it is probable
        besar       kemungkinannya         penyelesaian                       that an outflow of resources embodying
        kewajiban tersebut mengakibatkan arus keluar                          economic benefits will be required to settle the
        sumber daya yang mengandung manfaat                                   obligation and a reliable estimate can be made
        ekonomi dan estimasi yang andal mengenai                              of the amount of the obligation.
        jumlah kewajiban tersebut dapat dibuat.

        Provisi ditelaah pada setiap tanggal pelaporan                        Provisions are reviewed at each reporting date
        dan disesuaikan untuk mencerminkan estimasi                           and adjusted to reflect the current best
        terbaik yang paling kini. Jika arus keluar sumber                     estimate. If it is no longer probable that an
        daya     untuk     menyelesaikan        kewajiban                     outflow of resources embodying economic
        kemungkinan besar tidak terjadi, maka provisi                         benefits will be required to settle the obligation,
        dibatalkan.                                                           the provision is reversed.

        Pengeluaran yang terkait dengan pemulihan,                            Restoration, rehabilitation and environmental
        rehabilitasi dan lingkungan hidup yang terjadi                        expenditure incurred during the production
        pada tahap produksi dibebankan sebagai                                phase are charged to cost of revenues as
        bagian dari beban pokok penjualan pada saat                           incurred.
        terjadinya.




                                                               - 46 -
Page 53
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


        Grup memiliki kewajiban tertentu untuk                             The Group has certain obligations for
        merestorasi     dan     merehabilitasi  daerah                     restoration and rehabilitation of mining areas
        pertambangan sesudah produksi selesai.                             following the completion of production. In
        Dalam menentukan keberadaan liabilitas                             determining whether a liability exists in respect
        tersebut, Grup mengacu kepada kriteria                             of such requirements, the Group refers to the
        pengakuan liabilitas sesuai dengan standar                         criteria for such liability recognition under the
        akuntansi yang berlaku. Perubahan taksiran                         applicable accounting standards. Changes in
        biaya restorasi dan lingkungan hidup yang akan                     estimated restoration and environmental
        terjadi dihitung secara prospektif berdasarkan                     expenditure to be incurred are accounted for on
        sisa umur tambang.                                                 a prospective basis over the remaining life of
                                                                           the mine.

   t.   Pendapatan dari Kontrak dengan Pelanggan                      t.   Revenue from Contract with Customers and
        dan Pengakuan Beban                                                Recognition of Expenses

        Pendapatan dari kontrak dengan pelanggan                           Revenue from contracts with customers is
        diakui pada saat pengendalian barang atau jasa                     recognized when control of the goods or
        dialihkan kepada pelanggan dalam jumlah yang                       services are transferred to the customer at an
        mencerminkan imbalan yang diharapkan akan                          amount that reflects the consideration to which
        menjadi hak Grup dalam pertukaran barang                           the Group expects to be entitled in exchange
        atau jasa tersebut. Grup secara umum                               for those goods or services. The Group has
        menyimpulkan bahwa hal tersebut adalah yang                        generally concluded that it is the principal in its
        utama dalam pengaturan pendapatannya,                              revenue arrangements, except for the agency
        kecuali untuk jasa keagenan di bawah ini,                          services below, because it typically controls the
        karena secara khusus mengendalikan barang                          goods or services before transferring them to
        atau jasa sebelum mentransfernya ke                                the customer.
        pelanggan.

        Pengakuan pendapatan mensyaratkan untuk                            Revenue recognition is required to fulfill 5 steps
        memenuhi 5 langkah analisis sebagai berikut:                       of assessment as follows:

        1.   Identifikasi kontrak dengan pelanggan.                        1.   Identify contract(s) with a customer.

        2.   Identifikasi kewajiban pelaksanaan dalam                      2.   Identify the performance obligations in the
             kontrak.       Kewajiban     pelaksanaan                           contract. Performance obligations are
             merupakan janji-janji dalam kontrak untuk                          promises in a contract to transfer to a
             menyerahkan barang atau jasa yang                                  customer goods or services that are
             memiliki     karakteristik  berbeda    ke                          distinct.
             pelanggan.

        3.   Menetapkan harga transaksi, setelah                           3.   Determine the transaction price, net of
             dikurangi diskon, retur, insentif penjualan                        discounts, returns, sales incentives and
             dan pajak pertambahan nilai, yang berhak                           value added tax, which an entity expects to
             diperoleh     suatu     entitas     sebagai                        be entitled in exchange for transferring the
             kompensasi atas diserahkannya barang                               promised goods or services to a customer.
             atau jasa yang dijanjikan di kontrak.

        4.   Alokasi harga transaksi ke setiap                             4.   Allocate the transaction price to each
             kewajiban         pelaksanaan        dengan                        performance obligation on the basis of the
             menggunakan dasar harga jual berdiri                               relative stand-alone selling prices of each
             sendiri relatif dari setiap barang atau jasa                       distinct goods or services promised in the
             berbeda yang dijanjikan di kontrak. Ketika                         contract. When these are not directly
             tidak dapat diamati secara langsung, harga                         observable, the relative standalone selling
             jual berdiri sendiri relatif diperkirakan                          price are estimated based on expected
             berdasarkan biaya yang diharapkan                                  cost plus margin.
             ditambah marjin.




                                                            - 47 -
Page 54
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


        5.   Pengakuan pendapatan ketika kewajiban                        5.   Recognize revenue when performance
             pelaksanaan telah dipenuhi dengan                                 obligation is satisfied by transferring a
             menyerahkan barang atau jasa yang                                 promised goods or services to a customer
             dijanjikan ke pelanggan (ketika pelanggan                         (which is when the customer obtains
             telah memiliki kendali atas barang atau                           control of those goods of services).
             jasa tersebut).

        Untuk     penjualan       barang,    kewajiban                    For sale of goods, performance obligation is
        pelaksanaan       umumnya     terpenuhi,   dan                    typically satisfied, and revenue is recognized,
        pendapatan diakui, pada saat pengendalian                         when the control of goods has been transferred
        atas barang telah berpindah kepada pelanggan                      to the customer (a point of time).
        (pada suatu titik waktu).

        Penerimaan kas dari pelanggan sehubungan                          Cash received from customer related to the
        dengan transaksi penjualan yang belum                             sales transactions which have not fulfilled the
        memenuhi kriteria pengakuan pendapatan,                           criteria for revenue recognition are recorded as
        dicatat sebagai bagian dari “Uang muka                            part of “Advance from customers - third parties”
        pelanggan - pihak ketiga” dalam laporan posisi                    in the consolidated statement of financial
        keuangan konsolidasian.                                           position.

        Penghasilan/Beban Bunga                                           Interest Income/Expense

        Untuk semua instrumen keuangan yang diukur                        For all financial instruments measured at
        pada        biaya    perolehan     diamortisasi,                  amortized cost, interest income or expense is
        penghasilan atau beban bunga dicatat dengan                       recorded using the EIR, which is the rate that
        menggunakan metode SBE, yaitu tingkat suku                        exactly discounts the estimated future cash
        bunga digunakan mendiskontokan secara tepat                       payments or receipts over the expected life of
        estimasi pembayaran atau penerimaan arus                          the financial instrument or a shorter period,
        kas di masa yang akan datang selama umur                          where appropriate, to the net carrying amount
        ekpektasian dari instrumen keuangan, atau jika                    of the financial asset or liability.
        lebih sesuai, selama periode yang lebih singkat,
        untuk jumlah tercatat bersih dari aset atau
        liabilitas keuangan.

        Beban                                                             Expenses

        Beban diakui pada saat terjadinya (asas                           Expenses are       recognized when        incurred
        akrual).                                                          (accrual basis).

   u.   Sewa                                                         u.   Leases

        Grup menilai pada saat insepsi kontrak apabila                    The Group assesses at contract inception
        kontrak tersebut adalah, atau mengandung,                         whether a contract is, or contains, a lease. That
        sewa. Yaitu, bila kontrak tersebut memberikan                     is, if the contract conveys the right to control the
        hak untuk mengendalikan penggunaan aset                           use of an identified asset for a period of time in
        identifikasian selama suatu jangka waktu untuk                    exchange for consideration.
        dipertukarkan dengan imbalan.

        Grup sebagai penyewa                                              The Group as lessee

        Grup menerapkan pendekatan pengakuan dan                          The Group applies a single recognition and
        pengukuran tunggal untuk semua sewa, kecuali                      measurement approach for all leases, except
        untuk sewa jangka-pendek dan sewa yang aset                       for short-term leases and leases of low-value
        pendasarnya bernilai-rendah. Grup mengakui                        assets. The Group recognizes lease liabilities
        liabilitas sewa untuk melakukan pembayaran                        to make lease payments and right-of-use
        sewa dan aset hak-guna yang mewakili hak                          assets representing the right to use the
        untuk menggunakan aset pendasar.                                  underlying assets.




                                                           - 48 -
Page 55
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


       Aset hak guna                                                      Right-of-use assets

       Grup mengakui aset hak-guna pada tanggal                           The Group recognizes right-of-use assets at
       permulaan sewa (yaitu tanggal aset pendasar                        the commencement date of the lease (i.e., the
       tersedia untuk digunakan). Aset hak-guna                           date the underlying asset is available for use).
       diukur pada harga perolehan, dikurangi                             Right-of-use assets are measured at cost, less
       akumulasi penyusutan dan penurunan nilai,                          any accumulated depreciation and impairment
       serta disesuaikan dengan pengukuran kembali                        losses, and adjusted for any remeasurement of
       liabilitas sewa. Biaya perolehan aset hak-guna                     lease liabilities. The cost of right-of-use assets
       mencakup jumlah liabilitas sewa yang diakui,                       includes the amount of lease liabilities
       biaya langsung awal yang terjadi, dan                              recognized, initial direct costs incurred, and
       pembayaran sewa yang dilakukan pada atau                           lease payments made at or before the
       sebelum tanggal permulaan dikurangi setiap                         commencement date less any lease incentives
       insentif sewa yang diterima. Aset hak guna                         received. Right-of-use assets are depreciated
       disusutkan dengan metode garis lurus selama                        on a straight-line basis over the lease term.
       masa sewa.

       Liabilitas sewa                                                    Lease liabilities

       Pada tanggal permulaan sewa, Grup mengakui                         At the commencement date of the lease, the
       liabilitas sewa yang diukur pada nilai kini                        Group recognizes lease liabilities measured at
       pembayaran sewa yang harus dilakukan                               the present value of lease payments to be
       selama masa sewa.                                                  made over the lease term.

       Pembayaran sewa juga mencakup harga                                The lease payments also include the exercise
       pelaksanaan dari opsi beli yang secara wajar                       price of a purchase option reasonably certain to
       pasti dilaksanakan oleh Grup dan pembayaran                        be exercised by the Group and payments of
       pinalti untuk mengakhiri sewa, jika masa sewa                      penalties for terminating the lease, if the lease
       merefleksikan adanya opsi dapat mengakhiri                         term reflects exercising the option to terminate.
       sewa. Pembayaran sewa variabel yang tidak                          Variable lease payments that do not depend on
       bergantung pada indeks atau tarif diakui                           an index or a rate are recognized as expenses
       sebagai beban pada periode terjadinya                              in the period in which the event or condition that
       peristiwa atau kondisi yang memicu terjadinya                      triggers the payment occurs.
       pembayaran tersebut.

       Dalam menghitung nilai kini pembayaran sewa,                       In calculating the present value of lease
       Grup menggunakan Suku Bunga Pinjaman                               payments, the Group uses its Incremental
       Inkremental (SBPI) pada tanggal permulaan                          Borrowing Rate (IBR) at the lease
       sewa karena suku bunga implisit dalam sewa                         commencement date because the interest rate
       tidak dapat langsung ditentukan. Setelah                           implicit in the lease is not readily determinable.
       tanggal permulaan, jumlah kewajiban sewa                           After the commencement date, the amount of
       ditingkatkan untuk mencerminkan akresi bunga                       lease liabilities is increased to reflect the
       (atas efek diskonto) dan dikurangi untuk                           accretion of interest and reduced for the lease
       pembayaran sewa yang dilakukan. Selain itu,                        payments made. In addition, the carrying
       nilai tercatat liabilitas sewa diukur kembali jika                 amount of lease liabilities is remeasured if there
       terdapat modifikasi, perubahan masa sewa,                          is a modification, a change in the lease term, a
       perubahan pembayaran sewa, atau perubahan                          change in the lease payments or a change in
       penilaian atas opsi untuk membeli aset                             the assessment of an option to purchase the
       pendasar.                                                          underlying asset.




                                                            - 49 -
Page 56
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


        Sewa jangka pendek dan sewa dengan aset                         Short-term leases and leases of low-value
        bernilai rendah                                                 assets

        Grup menerapkan pengecualian pengakuan                          The Group applies the short-term lease
        sewa jangka pendek untuk sewa yang jangka                       recognition exemption to its short-term leases
        waktu sewanya pendek (yaitu, sewa yang                          (i.e., those leases that have a lease term of
        memiliki jangka waktu sewa 12 bulan atau                        12 months or less from the commencement
        kurang dari tanggal permulaan dan tidak                         date and do not contain a purchase option). The
        memiliki opsi beli). Grup juga menerapkan                       Group also applies the lease of low-value
        pengecualian pengakuan sewa dengan aset                         assets recognition exemption to leases that are
        bernilai rendah untuk sewa yang aset                            considered to be low value. Lease payments on
        pendasarnya dianggap bernilai rendah.                           short-term leases and leases of low-value
        Pembayaran sewa untuk sewa jangka pendek                        underlying assets are recognized as expense
        dan sewa dari aset bernilai rendah diakui                       on a straight-line basis over the lease term.
        sebagai beban dengan metode garis lurus
        selama masa sewa.

        Grup sebagai pesewa                                             The Group as lessor

        Sewa yang dalam pengaturannya Grup tidak                        Leases in which the Group does not transfer
        mengalihkan secara substansial seluruh risiko                   substantially all the risks and rewards incidental
        dan manfaat yang terkait dengan kepemilikan                     to ownership of an asset are classified as
        suatu aset diklasifikasikan sebagai sewa                        operating leases. Lease income arising is
        operasi. Pendapatan sewa yang timbul dicatat                    accounted for on a straight-line basis over the
        dengan metode garis lurus selama masa sewa                      lease terms and is included in other operating
        dan diakui sebagai bagian dari pendapatan                       income in the profit or loss due to its operating
        usaha pada laba rugi karena sifatnya. Biaya                     nature. Initial direct costs incurred in
        langsung awal yang terjadi dalam negosiasi dan                  negotiating and arranging an operating lease
        pengaturan sewa operasi ditambahkan ke                          are added to the carrying amount of the leased
        jumlah tercatat dari aset sewaan dan diakui                     asset and recognized over the lease term on
        selama masa sewa atas dasar yang sama                           the same basis as lease income.
        dengan pendapatan sewa.

   v.   Perpajakan                                                 v.   Taxation

        Pajak Kini                                                      Current Tax

        Aset dan liabilitas pajak kini untuk tahun                      Current income tax assets and liabilities for the
        berjalan diukur sebesar jumlah yang                             current year are measured at the amount
        diharapkan dapat direstitusi dari atau                          expected to be recovered from or paid to the
        dibayarkan kepada otoritas perpajakan. Tarif                    taxation authority. The tax rates and tax laws
        pajak dan peraturan pajak yang digunakan                        used to compute the amount are those that
        untuk menghitung jumlah tersebut adalah yang                    have been enacted or substantively enacted as
        telah berlaku atau secara substantif telah                      at the reporting date in the countries where the
        berlaku pada tanggal pelaporan di negara                        Group operates and generates taxable income.
        tempat Grup beroperasi dan menghasilkan
        pendapatan kena pajak.

        Bunga dan denda disajikan sebagai bagian dari                   Interests and penalties are presented as part of
        penghasilan atau beban operasi lain karena                      other operating income or expenses since they
        tidak dianggap sebagai bagian dari beban pajak                  are not considered as part of the income tax
        penghasilan.                                                    expense.




                                                         - 50 -
Page 57
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


       Pajak penghasilan kini terkait dengan pos-pos                     Current income tax relating to items recognized
       yang diakui secara langsung di ekuitas diakui                     directly in equity is recognized in equity and not
       dalam ekuitas dan bukan dalam laporan laba                        in the statement of profit or loss. Management
       rugi. Manajemen secara berkala mengevaluasi                       periodically evaluates positions taken in the tax
       posisi yang diambil dalam SPT sehubungan                          returns with respect to situations in which
       dengan situasi di mana peraturan perpajakan                       applicable tax regulations are subject to
       yang berlaku tunduk pada interpretasi dan                         interpretation and establishes provisions where
       menetapkan ketentuan yang sesuai.                                 appropriate.

       Pajak Tangguhan                                                   Deferred Tax

       Pajak tangguhan diakui dengan menggunakan                         Deferred tax is provided using the liability
       metode liabilitas atas perbedaan temporer pada                    method on temporary differences at the
       tanggal pelaporan antara dasar pengenaan                          reporting date between the tax bases of assets
       pajak dari aset dan liabilitas dan jumlah                         and liabilities and their carrying amounts for
       tercatatnya untuk tujuan pelaporan keuangan                       financial reporting purposes at the reporting
       pada tanggal pelaporan.                                           date.

       Aset pajak tangguhan diakui untuk seluruh                         Deferred tax assets are recognized for all
       perbedaan temporer yang dapat dikurangkan                         deductible temporary differences and carry
       dan akumulasi rugi pajak belum dikompensasi,                      forward of unused tax losses, to the extent that
       bila kemungkinan besar laba kena pajak akan                       it is probable that taxable profits will be
       tersedia sehingga perbedaan temporer dapat                        available against which deductible temporary
       dikurangkan tersebut, dan rugi pajak belum                        differences, and the carry forward of unused tax
       dikompensasi, dapat dimanfaatkan, kecuali:                        losses can be utilized, except:

       i.    jika aset pajak tangguhan timbul dari                       i.    where the deferred tax asset relating to the
             pengakuan awal aset atau liabilitas dalam                         deductible temporary difference arises
             transaksi yang bukan transaksi kombinasi                          from the initial recognition of an asset or
             bisnis dan tidak mempengaruhi laba                                liability in a transaction that is not a
             akuntansi maupun laba kena pajak/rugi                             business combination and, at the time of
             pajak; atau                                                       the transaction, affects neither the
                                                                               accounting profit nor taxable profit or loss;
                                                                               or

       ii.   dari perbedaan temporer yang dapat                          ii.   in respect of deductible temporary
             dikurangkan atas investasi pada entitas                           differences associated with investments in
             anak, aset pajak tangguhan hanya diakui                           subsidiaries, deferred tax assets are
             bila besar kemungkinannya bahwa beda                              recognized only to the extent that it is
             temporer itu tidak akan dibalik dalam waktu                       probable that the temporary differences
             dekat dan laba kena pajak dapat                                   will reverse in the foreseeable future and
             dikompensasi dengan beda temporer                                 taxable profit will be available against
             tersebut.                                                         which the temporary differences can be
                                                                               utilized.

       Jumlah tercatat aset pajak tangguhan ditelaah                     The carrying amount of a deferred tax asset is
       pada setiap tanggal pelaporan dan diturunkan                      reviewed at each reporting date and reduced to
       apabila laba fiskal mungkin tidak memadai                         the extent that it is no longer probable that
       untuk mengkompensasi sebagian atau semua                          sufficient taxable profit will be available to allow
       manfaat aset pajak tangguhan. Aset pajak                          all or part of the benefit of that deferred tax
       tangguhan yang tidak diakui ditinjau ulang pada                   asset to be utilized. Unrecognized deferred tax
       setiap tanggal pelaporan dan akan diakui                          assets are reassessed at each reporting date
       apabila besar kemungkinan bahwa laba fiskal                       and are recognized to the extent that it has
       pada masa yang akan datang akan tersedia                          become probable that future taxable profit will
       untuk pemulihannya.                                               allow the deferred tax assets to be recovered.




                                                           - 51 -
Page 58
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


       Liabilitas pajak tangguhan diakui untuk semua                      Deferred tax liabilities are recognized for all
       perbedaan temporer yang kena pajak, kecuali:                       taxable temporary differences, except:

       i.    liabilitas pajak tangguhan yang terjadi dari                 i.    where the deferred tax liability arises from
             pengakuan awal goodwill atau dari aset                             the initial recognition of goodwill or of an
             atau liabilitas dari transaksi yang bukan                          asset or liability in a transaction that is not
             transaksi kombinasi bisnis, dan pada                               a business combination and, at the time of
             waktu transaksi tidak mempengaruhi laba                            the transaction affects neither the
             akuntansi dan laba kena pajak/rugi pajak;                          accounting profit nor taxable profit or loss;

       ii.   dari perbedaan temporer kena pajak atas                      ii.   in respect of taxable temporary differences
             investasi pada entitas anak, yang saat                             associated       with    investments      in
             pembalikannya dapat dikendalikan dan                               subsidiaries, when the timing of the
             besar kemungkinannya bahwa beda                                    reversal of the temporary differences can
             temporer itu tidak akan dibalik dalam waktu                        be controlled and it is probable that the
             dekat.                                                             temporary differences will not reverse in
                                                                                the foreseeable future.

       Aset dan liabilitas pajak tangguhan diukur                         Deferred tax assets and liabilities are measured
       dengan menggunakan tarif pajak yang                                at the tax rates that are expected to apply to the
       diharapkan akan berlaku pada tahun saat aset                       year when the asset is realized or the liability is
       dipulihkan    atau    liabilitas diselesaikan                      settled, based on tax rates and tax laws that
       berdasarkan tarif pajak dan peraturan pajak                        have been enacted or substantively enacted as
       yang berlaku atau yang secara substantif telah                     at the reporting date.
       berlaku pada tanggal pelaporan.

       Pajak tangguhan terkait dengan pos-pos yang                        Deferred tax relating to items recognized
       diakui di luar laba rugi diakui di luar laba rugi.                 outside profit or loss is recognized outside profit
       Item pajak tangguhan diakui sesuai dengan                          or loss. Deferred tax items are recognized in
       transaksi yang mendasarinya baik di PKL                            correlation to the underlying transaction either
       maupun secara langsung di ekuitas.                                 in OCI or directly in equity.

       Manfaat pajak yang diperoleh sebagai bagian                        Tax benefits acquired as part of a business
       dari kombinasi bisnis, tetapi tidak memenuhi                       combination, but not satisfying the criteria for
       kriteria untuk pengakuan terpisah pada tanggal                     separate recognition at that date, are
       tersebut, diakui selanjutnya jika informasi baru                   recognised subsequently if new information
       tentang fakta dan keadaan berubah.                                 about facts and circumstances change. The
       Penyesuaian tersebut diperlakukan sebagai                          adjustment is either treated as a reduction in
       pengurangan goodwill (selama tidak melebihi                        goodwill (as long as it does not exceed
       goodwill)     jika  terjadi   selama     periode                   goodwill) if it was incurred during the
       pengukuran atau diakui dalam laba rugi.                            measurement period or recognized in profit or
                                                                          loss.

       Grup melakukan saling hapus aset pajak                             The Group offsets deferred tax assets and
       tangguhan dan liabilitas pajak tangguhan jika                      deferred tax liabilities if and only if it has a
       dan hanya jika memiliki hak yang berkekuatan                       legally enforceable right to set off current tax
       hukum untuk saling hapus aset pajak kini dan                       assets and current tax liabilities and the
       liabilitas pajak kini dan aset pajak tangguhan                     deferred tax assets and deferred tax liabilities
       dan liabilitas pajak tangguhan terkait dengan                      relate to income taxes levied by the same
       pajak penghasilan yang dikenakan oleh otoritas                     taxation authority on either the same taxable
       perpajakan yang sama atas baik entitas kena                        entity or different taxable entities which intend
       pajak yang sama atau entitas kena pajak yang                       either to settle current tax liabilities and assets
       berbeda yang bermaksud untuk menyelesaikan                         on a net basis, or to realise the assets and
       liabilitas dan aset pajak kini secara neto, atau                   settle the liabilities simultaneously, in each
       untuk merealisasikan aset dan menyelesaikan                        future period in which significant amounts of
       liabilitas secara bersamaan, pada setiap                           deferred tax liabilities or assets are expected to
       periode masa depan di mana jumlah liabilitas                       be settled or recovered.
       atau aset pajak tangguhan yang signifikan
       diharapkan untuk diselesaikan atau dipulihkan.



                                                            - 52 -
Page 59
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


        Pajak Pertambahan Nilai                                            Value Added Tax

        Pendapatan, beban-beban dan aset-aset diakui                       Revenue, expenses and assets are recognized
        neto atas jumlah PPN kecuali:                                      net of the amount of VAT except:

        •   PPN yang muncul dari pembelian aset atau                       •   Where the VAT incurred on a purchase of
            jasa yang tidak dapat dikreditkan, yang                            assets or services is not recoverable, in
            dalam hal ini PPN diakui sebagai bagian                            which case the VAT is recognized as part
            dari biaya perolehan aset atau sebagai                             of the cost of acquisition of the asset or as
            bagian dari item beban-beban yang terkait;                         part of the expense item as applicable; and
            dan

        •   Piutang dan utang yang disajikan termasuk                      •   Receivables and payables that are stated
            dengan jumlah PPN.                                                 with the amount of VAT included.

        Jumlah PPN neto yang diajukan untuk                                The net amount of VAT which is claimed for
        direstitusi, atau terutang kepada, kantor pajak                    restitution from, or payable to, the taxation
        termasuk sebagai bagian dari aset atau                             authorities is included as part of assets or
        liabilitas pada laporan posisi keuangan                            liabilities in the consolidated statement of
        konsolidasian.                                                     financial position.

        Pajak Final                                                        Final Tax

        Sesuai peraturan perpajakan di Indonesia,                          In accordance with the tax regulation in
        pajak final dikenakan atas nilai bruto transaksi,                  Indonesia, final tax is applied to the gross value
        dan tetap dikenakan walaupun atas transaksi                        of transactions, even when the parties carrying
        tersebut pelaku transaksi mengalami kerugian.                      the transaction recognizing losses.

        Pajak final tidak termasuk dalam lingkup yang                      Final tax is scoped out from PSAK No. 212
        diatur oleh PSAK No. 212 ”Pajak Penghasilan”.                      “Income Tax”.

   w. Laba per Saham                                                  w. Earnings per Share

        Laba per saham dihitung berdasarkan rata- rata                     Earnings per share is computed based on the
        tertimbang jumlah saham yang beredar selama                        weighted average number of issued and fully
        tahun yang bersangkutan.                                           paid shares during the year.

        Perusahaan tidak mempunyai efek berpotensi                         The Company has no outstanding dilutive
        saham biasa yang bersifat dilutif pada tanggal                     potential   ordinary   shares     as  of
        31 Maret 2025 dan 31 Desember 2024.                                March 31, 2025 and December 31, 2024.

   x.   Informasi Segmen                                              x.   Segment Information

        Untuk tujuan manajemen, Grup dibagi menjadi                        For management purposes, the Group is
        dua segmen operasi berdasarkan produk dan                          organized into two operating segments based
        jasa yang dikelola secara independen oleh                          on their products and services which are
        masing-masing pengelola segmen yang                                independently managed by the respective
        bertanggung jawab atas kinerja dari masing-                        segment managers responsible for the
        masing segmen. Para pengelola segmen                               performance of the respective segments under
        melaporkan    secara    langsung    kepada                         their charge. The segment managers report
        manajemen Perusahaan yang secara teratur                           directly to the management who regularly
        mengkaji laba segmen sebagai dasar untuk                           review the segment results in order to allocate
        mengalokasikan sumber daya ke masing-                              resources to the segments and to assess the
        masing segmen dan untuk menilai kinerja                            segment performance.
        segmen.

        Pengungkapan tambahan pada masing-                                 Additional disclosures on each of these
        masing segmen terdapat dalam Catatan 38,                           segments are shown in Note 38, including the
        termasuk faktor yang digunakan untuk                               factors used to identify the reportable segments
        mengidentifikasi segmen yang dilaporkan dan                        and the measurement basis of segment
        dasar pengukuran informasi segmen.                                 information.


                                                            - 53 -
Page 60
PT GOLDEN ENERGY MINES Tbk                                                                   PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                       AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                        Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                   As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                            and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                       March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                             (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                             unless Otherwise Stated)


     y.   Peristiwa setelah Periode Pelaporan                               y.   Events after Reporting Period

          Peristiwa-peristiwa yang terjadi setelah periode                       Post year-end events that provide additional
          pelaporan yang menyediakan tambahan                                    information about the interim consolidated
          informasi    mengenai       posisi     keuangan                        statement of financial position at the reporting
          konsolidasian Grup pada tanggal laporan posisi                         date (adjusting events), if any, are reflected in
          keuangan konsolidasian (peristiwa penyesuai),                          the consolidated financial statements. Post
          jika ada, telah tercermin dalam laporan                                yearend events that are not adjusting events
          keuangan konsolidasian interim. Peristiwa-                             are disclosed in the notes to interim
          peristiwa yang terjadi setelah periode                                 consolidated financial statements when
          pelaporan yang tidak memerlukan penyesuaian                            material.
          (peristiwa nonpenyesuai), apabila jumlahnya
          material, telah diungkapkan dalam laporan
          keuangan konsolidasian interim.


3.   Pertimbangan, Estimasi dan Asumsi Akuntansi                      3.    Significant Accounting Judgments, Estimates
     Signifikan                                                             and Assumptions

     Penyusunan laporan keuangan konsolidasian                              The preparation of the Group’s interim consolidated
     interim Grup mengharuskan manajemen untuk                              financial statements requires management to make
     membuat pertimbangan, estimasi dan asumsi yang                         judgments, estimates and assumptions that effect
     memengaruhi jumlah yang dilaporkan dari                                the reported amounts of revenues, expenses,
     pendapatan, beban, aset dan liabilitas, dan                            assets and liabilities, and the disclosure of
     pengungkapan atas liabilitas kontinjensi, pada akhir                   contingent liabilities, at the end of the reporting
     periode pelaporan. Ketidakpastian mengenai                             period. Uncertainty about these judgments,
     pertimbangan, asumsi dan estimasi tersebut dapat                       assumptions and estimates could result in
     mengakibatkan penyesuaian material terhadap nilai                      outcomes that require a material adjustment to the
     tercatat aset dan liabilitas dalam pelaporan dimasa                    carrying amounts of assets and liabilities affected in
     mendatang.                                                             future years.

     Pertimbangan                                                           Judgments

     Pertimbangan-pertimbangan berikut dibuat oleh                          The following judgments are made by management
     manajemen dalam rangka penerapan kebijakan                             in the process of applying the Group’s accounting
     akuntansi Grup yang memiliki pengaruh paling                           policies that have the most significant effects on the
     signifikan atas jumlah yang diakui dalam laporan                       amounts recognized in the interim consolidated
     keuangan konsolidasian interim:                                        financial statements:

     a.   Perpajakan                                                        a.   Taxation

          Ketidakpastian atas interpretasi dari peraturan                        Uncertainties exist with respect to the
          pajak yang kompleks, perubahan peraturan                               interpretation of complex tax regulations,
          pajak dan jumlah dan timbulnya penghasilan                             changes in tax laws, and the amount and timing
          kena pajak di masa depan, dapat menyebabkan                            of future taxable income, could necessitate
          penyesuaian di masa depan atas penghasilan                             future adjustments to tax income and expense
          dan beban pajak yang telah dicatat.                                    already recorded.

          Pertimbangan       juga    dilakukan    dalam                          Judgment is also involved in determining the
          menentukan penyisihan atas pajak penghasilan                           provision for corporate income tax. There are
          badan. Terdapat transaksi dan perhitungan                              certain transactions and computation for which
          tertentu yang penentuan pajak akhirnya adalah                          the ultimate tax determination is uncertain
          tidak pasti sepanjang kegiatan usaha normal.                           during the ordinary course of business.

          Jumlah tercatat pajak dibayar di muka, utang                           The Group’s carrying amount of prepaid taxes,
          pajak penghasilan, aset pajak tangguhan dan                            taxes payable, deferred tax assets and
          liabilitas pajak tangguhan Grup diungkapkan                            deferred tax liabilities are disclosed in Note 33.
          dalam Catatan 33.



                                                             - 54 -
Page 61
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


   b.   Alokasi Harga Beli dan Penurunan Goodwill                     b.   Purchase Price      Allocation   and    Goodwill
                                                                           Impairment

        Akuntansi akuisisi mengharuskan penggunaan                         Acquisition accounting requires extensive use
        estimasi akuntansi secara ekstensif dalam                          of accounting estimates to allocate the
        mengalokasikan biaya perolehan kepada nilai                        purchase price to the fair market values of the
        pasar wajar yang dapat diandalkan atas aset                        assets and liabilities purchased, including
        dan liabilitas yang diakuisisi, termasuk aset tak                  intangible assets. Under PSAK No. 103,
        berwujud. Sesuai PSAK No. 103, “Kombinasi                          “Business Combinations”, goodwill is not
        Bisnis”, goodwill tidak diamortisasi dan                           amortized and is subject to an annual
        dilakukan pengujian atas penurunan nilainya                        impairment testing. Further details are
        setiap tahunnya. Penjelasan lebih rinci                            disclosed in Note 32.
        diungkapkan dalam Catatan 32.

        Penyusunan estimasi arus kas masa depan                            The preparation of estimated future cash flows
        dalam menentukan nilai wajar aset pada                             in determining the fair values of assets at the
        tanggal-tanggal akuisisi melibatkan estimasi                       dates of acquisition involves significant
        yang     signifikan. Walaupun     manajemen                        estimations. While the management believes
        berkeyakinan bahwa asumsi yang digunakan                           that its assumptions are appropriate and
        adalah tepat dan masuk akal, perubahan                             reasonable, significant change in its
        signifikan pada asumsi tersebut dapat                              assumptions may materially affect its
        memengaruhi secara material evaluasi atas                          assessment of recoverable values and may
        nilai terpulihkan dan dapat menimbulkan                            lead to future impairment charges under
        penurunan nilai sesuai PSAK No. 236,                               PSAK No. 236, “Impairment of Assets”.
        “Penurunan Nilai Aset”.

        Goodwill diuji untuk penurunan nilai setiap                        Goodwill is subject to annual impairment test.
        tahunnya.      Manajemen        menggunakan                        Management uses its judgment in estimating
        pertimbangan dalam mengestimasi jumlah                             the recoverable value and determining if there
        terpulihnya dan menentukan adanya indikasi                         is any indication of impairment. Estimates on
        penurunan nilai. Estimasi atas nilai terpulihkan                   the recoverable amount are further described in
        diuraikan pada bagian “Estimasi dan Asumsi”                        “Estimates and Assumptions” section in this
        pada Catatan ini.                                                  Note.

   Estimasi dan Asumsi                                                Estimates and Assumptions

   Asumsi utama mengenai masa depan dan sumber                        The key assumptions concerning the future and
   utama lain dalam mengestimasi ketidakpastian                       other key sources of estimation uncertainty at the
   pada tanggal pelaporan yang mempunyai risiko                       reporting date that have a significant risk of causing
   signifikan yang dapat menyebabkan penyesuaian                      a material adjustment to the carrying amounts of
   material terhadap nilai tercatat aset dan liabilitas               assets and liabilities within the next financial period
   dalam periode berikutnya diungkapkan di bawah ini.                 are disclosed below. The Group based its
   Grup mendasarkan asumsi dan estimasi pada                          assumptions and estimates on parameters
   parameter yang tersedia saat laporan keuangan                      available when the interim consolidated financial
   konsolidasian interim disusun. Kondisi yang ada dan                statements were prepared. Existing circumstances
   asumsi mengenai perkembangan masa depan                            and assumptions about future developments may
   dapat berubah karena perubahan situasi pasar yang                  change due to market changes on circumstances
   berada di luar kendali Grup. Perubahan tersebut                    arising beyond the control of the Group. Such
   tercermin dalam asumsi ketika keadaan tersebut                     changes are reflected in the assumptions when they
   terjadi:                                                           occur:




                                                            - 55 -
Page 62
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


   a.   Penurunan Nilai Aset Non-Keuangan                          a.   Impairment of Non-Financial Assets

        Penelaahan atas penurunan nilai dilakukan                       Impairment review is performed when certain
        apabila terdapat indikasi penurunan nilai aset                  impairment       indicators    are     present.
        tertentu.    Penentuan    nilai  wajar    aset                  Determination of the fair value of assets
        membutuhkan estimasi arus kas yang                              requires the estimation of cash flows expected
        diharapkan akan dihasilkan dari pemakaian                       to be generated from the continued use and
        berkelanjutan dan pelepasan akhir atas aset                     ultimate disposition of such assets. Any
        tersebut. Perubahan signifikan dalam asumsi-                    significant changes in the assumptions used in
        asumsi yang digunakan untuk menentukan nilai                    determining the fair value may materially affect
        wajar dapat berdampak signifikan pada nilai                     the assessment of recoverable values and any
        terpulihkan dan jumlah kerugian penurunan                       resulting impairment loss could have a material
        nilai yang terjadi mungkin berdampak material                   impact on results of Group’s operations.
        pada hasil operasi Grup.

        Penjelasan lebih lanjut diungkapkan dalam                       Further details are disclosed in Notes 9, 11,
        Catatan 9, 11, dan 32.                                          and 32.

        Pada tanggal 31 Maret 2025 dan 31 Desember                      As of March 31, 2025 and December 31, 2024,
        2024, tidak ada kegiatan atau perubahan yang                    there are no events or changes in
        mengindikasikan penurunan nilai aset non-                       circumstances which indicate any impairment
        keuangan.                                                       in value of non-financial assets.

   b.   Estimasi Cadangan      dan    Sumber    Daya               b.   Coal Reserves and Resources Estimates
        Batubara

        Cadangan batubara merupakan estimasi atas                       Coal reserves are estimates of the amount of
        jumlah mineral tambang yang dapat secara                        ore that can be economically and legally
        ekonomis dan legal ditambang dari area                          extracted from the Group’s mining area.
        tambang Grup. Manajemen memperkirakan                           Management estimates its ore reserves and
        jumlah cadangan mineral tambang dan sumber                      mineral resources based on information
        daya mineral berdasarkan informasi mengenai                     complied by appropriately qualified persons
        data geologis terhadap ukuran, kedalaman dan                    relating to the geological data on the size, depth
        susunan bebatuan yang dikompilasi oleh orang                    and shape of the ore body, and requires
        yang memiliki kualifikasi yang memadai, dan                     complex geological judgements to interpret the
        mengharuskan pertimbangan geologis yang                         data. Changes in the reserved or resource
        rumit untuk menerjemahkan data tersebut.                        estimates may have an impact on the carrying
        Perubahan pada estimasi cadangan dan                            value of mines properties and amortization
        sumber daya akan mempengaruhi nilai tercatat                    charges.
        dari aset pertambangan serta besarnya
        amortisasi.




                                                         - 56 -
Page 63
PT GOLDEN ENERGY MINES Tbk                                                                PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                     Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                         and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                    March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                          (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                          unless Otherwise Stated)


   c.   Provisi untuk     Reklamasi      dan   Penutupan                 c.   Provision for Reclamation and Mine Closure
        Tambang

        Manajemen menilai provisi ini pada setiap                             Management assesses this provision at each
        tanggal pelaporan. Estimasi dan asumsi yang                           reporting date. Significant estimates and
        signifikan digunakan dalam penentuan provisi                          assumptions are made in determining this
        karena banyak faktor yang memengaruhi                                 provision as there are numerous factors that
        besarnya jumlah akhir yang terutang. Faktor                           will affect the ultimate liability payable. These
        tersebut diantaranya adalah estimasi ruang                            factors include estimates of the extent and
        lingkup dan biaya aktivitas rehabilitasi,                             costs of rehabilitation activities, technological
        perubahan teknologi, peraturan, kenaikan biaya                        changes, regulatory changes, cost increases
        karena terjadinya inflasi dan perubahan tingkat                       as compared to the inflation rates and changes
        diskonto.      Ketidakpastian     ini     dapat                       in discount rates. These uncertainties may
        menyebabkan pengeluaran aktual di masa                                result in future actual expenditure differing from
        mendatang tidak sama dengan jumlah provisi                            the amounts currently provided. The provision
        yang diakui pada saat ini. Saldo provisi pada                         at the reporting date represents management’s
        tanggal pelaporan merupakan estimasi terbaik                          best estimate of the present value of the future
        manajemen mengenai nilai kini atas biaya                              rehabilitation costs required.
        rehabilitasi yang akan terjadi di masa
        mendatang.

        Perubahan atas estimasi biaya yang akan                               Changes to estimated future costs are
        terjadi di masa mendatang diakui di dalam                             recognized in the consolidated statement of
        laporan posisi keuangan konsolidasian dengan                          financial position by either recognizing increase
        mengakui kenaikan atau penurunan provisi dan                          or decrease of the provision and asset if the
        aset, jika pada saat pengakuan awal provisi ini                       initial estimate was originally recognized as part
        diakui sebagai bagian dari aset yang diukur                           of an asset measured in accordance with PSAK
        sesuai dengan PSAK No. 216, “Aset Tetap”.                             No. 216, “Fixed Assets”. Any reduction in the
        Penurunan terhadap saldo provisi tidak boleh                          provision balance may not exceed the carrying
        melebihi nilai tercatat aset tersebut. Jika terjadi,                  amount of that asset. If it does, any excess over
        maka kelebihan tersebut diakui segera dalam                           the carrying value is taken immediately to profit
        laba rugi.                                                            or loss.

        Jika perubahan estimasi menyebabkan                                   If the change in estimate results in an increase
        kenaikan    liabilitas rehabilitasi    dan                            in the rehabilitation liability and therefore an
        penambahan nilai tercatat aset terkait,                               addition to the carrying value of the asset,
        manajemen     mempertimbangkan      apakah                            management considers whether this is an
        ini merupakan indikasi penurunan nilai                                indication of impairment of the asset as a
        aset secara keseluruhan, dan melakukan                                whole, and test for impairment in accordance
        pengujian atas penurunan nilai sesuai                                 with PSAK No. 236.
        dengan PSAK No. 236.

        Untuk tambang yang sudah siap, jika nilai aset                        For mature mines, if the revised mine assets
        tambang yang telah direvisi dan provisi untuk                         and net of rehabilitation provisions exceeds the
        rehabilitasi neto melebihi nilai yang dipulihkan,                     recoverable value, that portion of the increase
        sebagian dari kenaikan tersebut dibebankan                            is charged directly to expenses. For closed
        langsung ke dalam biaya. Untuk tambang yang                           sites, changes to estimated costs are
        sudah ditutup, perubahan estimasi biaya diakui                        recognized immediately in profit or loss. Also,
        secara langsung dalam laba rugi. Liabilitas                           rehabilitation obligations that arose as a result
        rehabilitasi yang muncul sebagai akibat dari                          of the production phase of a mine, should be
        fase produksi suatu area tambang, juga harus                          expensed when incurred. Further details are
        dibebankan pada saat terjadinya. Penjelasan                           disclosed in Note 19.
        lebih lanjut diungkapkan dalam Catatan 19.




                                                               - 57 -
Page 64
PT GOLDEN ENERGY MINES Tbk                                                                      PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                          AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                           Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                      As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                               and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                          March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                unless Otherwise Stated)


4.   Kas dan Setara Kas                                                  4.     Cash and Cash Equivalents

                                                       31 Maret/
                                                      March 31 ,
                                                         2025            31 Desember/
                                                    (Tidak Diaudit/      December 31 ,
                                                      Unaudited )            2024
     Kas                                                                                    Cash on hand
       Rupiah (Catatan 36)                                 212.093                91.737      Rupiah (Note 36)
       Dolar Amerika Serikat                                 1.300                 1.300      United States Dollar
     Jumlah kas                                            213.393                93.037    Total cash on hand

     Kas di bank                                                                            Cash in banks
     Pihak berelasi (Catatan 35)                                                            Related parties (Note 35)
        PT Bank Sinarmas Tbk                                                                  PT Bank Sinarmas Tbk
          Rupiah (Catatan 36)                              844.762                934.666        Rupiah (Note 36)
          Dolar Amerika Serikat                            766.494             31.693.130        United States Dollar
        PT Bank Nano Syariah (dahulu PT Bank                                                  PT Bank Nano Syariah (formerly PT Bank
          Sinarmas Tbk - Unit Usaha Syariah)                                                     Sinarmas Tbk - Sharia Business Unit)
          Rupiah (Catatan 36)                              337.519              5.704.086        Rupiah (Note 36)
     Jumlah                                              1.948.775             38.331.882   Sub-total

     Pihak ketiga                                                                           Third parties
        Rupiah (Catatan 36)                                                                   Rupiah (Note 36)
          PT Bank Mandiri (Persero) Tbk                23.908.785               1.812.647        PT Bank Mandiri (Persero) Tbk
          PT Bank Rakyat Indonesia (Persero) Tbk        7.675.978              13.551.788        PT Bank Rakyat Indonesia (Persero) Tbk
          PT Bank Negara Indonesia (Persero) Tbk        3.557.157               1.947.207        PT Bank Negara Indonesia (Persero) Tbk
          PT Bank Central Asia Tbk                        179.535                 186.417        PT Bank Central Asia Tbk
          PT Bank Pembangunan Daerah                                                             PT Bank Pembangunan Daerah
             Sumatera Selatan dan Bangka Belitung           61.388                78.778            Sumatera Selatan dan Bangka Belitung
          PT Bank UOB Indonesia                             54.806                56.023         PT Bank UOB Indonesia
          PT Bank Pembangunan Daerah                                                             PT Bank Pembangunan Daerah
             Kalimantan Tengah                              14.695                14.983            Kalimantan Tengah
          PT Bank Danamon Indonesia Tbk                      8.657                18.298         PT Bank Danamon Indonesia Tbk
        Dolar Amerika Serikat                                                                 United States Dollar
          PT Bank Mandiri (Persero) Tbk               185.209.781              72.339.821        PT Bank Mandiri (Persero) Tbk
          PT Bank Rakyat Indonesia (Persero) Tbk       70.980.090              92.479.562        PT Bank Rakyat Indonesia (Persero) Tbk
          PT Bank Negara Indonesia (Persero) Tbk       29.916.342              96.924.427        PT Bank Negara Indonesia (Persero) Tbk
          PT Bank Danamon Indonesia Tbk                 2.329.372               2.370.293        PT Bank Danamon Indonesia Tbk
          ICICI Bank Limited, Singapura                    96.848                 337.396        ICICI Bank Limited, Singapore
          CIMB Bank Berhad, Singapura                      70.795                  21.026        CIMB Bank Berhad, Singapore
          PT Bank Central Asia Tbk                         47.525                  47.580        PT Bank Central Asia Tbk
          Lembaga Pembiayaan Ekspor Indonesia                                                    Lembaga Pembiayaan Ekspor Indonesia
             (Eximbank)                                        770                      -           (Eximbank)
        Dolar Singapura (Catatan 36)                                                          Singapore Dollar (Note 36)
          CIMB Bank Berhad, Singapura                       30.828                17.876         CIMB Bank Berhad, Singapore
     Jumlah                                           324.143.352             282.204.122   Sub-total

     Jumlah kas di bank                               326.092.127             320.536.004   Total cash in banks

     Deposito berjangka                                                                     Time deposit
       ICICI Bank Limited, Singapura                                                          ICICI Bank Limited, Singapore
          Dolar Amerika Serikat                          9.000.000              6.300.000        United States Dollar

     Jumlah                                           335.305.520             326.929.041   Total




                                                                - 58 -
Page 65
PT GOLDEN ENERGY MINES Tbk                                                                   PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                       AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                        Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                   As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                            and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                       March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                             (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                             unless Otherwise Stated)


5.   Dana yang Dibatasi Pencairannya                                  5.    Restricted Funds

                                                    31 Maret/
                                                   March 31 ,
                                                      2025             31 Desember/
                                                 (Tidak Diaudit/       December 31,
                                                   Unaudited )             2024

     Pihak berelasi (Catatan 35)                                                        Related party (Note 35)
        PT Bank Sinarmas Tbk - TKS                        6.705                 6.882     PT Bank Sinarmas Tbk - TKS

     Pihak ketiga                                                                       Third parties
        PT Bank Negara Indonesia (Persero) Tbk                                            PT Bank Negara Indonesia (Persero) Tbk
          BORNEO                                      2.098.624             2.123.973        BORNEO
          BSL                                           592.245               592.246        BSL
          BSA                                           102.946               105.659        BSA
          WRL                                            65.754                67.487        WRL
          TKS                                            55.251                56.707        TKS
        PT Bank Rakyat Indonesia (Persero) Tbk                                            PT Bank Rakyat Indonesia (Persero) Tbk
          BORNEO                                    13.933.891              9.848.637        BORNEO
          BSL                                       10.464.617              8.074.991        BSL
          TKS                                          692.788                711.048        TKS
          KIM                                          604.354                506.845        KIM
          BHBA                                         372.475                382.292        BHBA
          KCP                                          344.154                353.225        KCP
          KIS                                          333.182                341.964        KIS
          BBU                                          314.479                322.768        BBU
          BBM                                          221.308                227.141        BBM
          TBBU                                         164.506                168.842        TBBU
          BNP                                          133.576                137.097        BNP
        PT Bank Mandiri (Persero) Tbk - WRL            202.948                208.297     PT Bank Mandiri (Persero) Tbk - WRL
        PT Bank Pembangunan Daerah                                                        PT Bank Pembangunan Daerah
          Kalimantan Tengah - TKS                       413.174               424.065        Kalimantan Tengah - TKS
       Jumlah                                       31.110.272             24.653.284     Sub-total

     Jumlah                                         31.116.977             24.660.166   Total


     Dana yang dibatasi pencairannya digunakan                              Restricted funds are used as collateral to carry out
     sebagai jaminan untuk melaksanakan rehabilitasi                        river rehabilitation, reclamation guarantee and post-
     aliran sungai, jaminan reklamasi dan penutupan                         mining guarantee with government.
     tambang dengan pemerintah.




                                                             - 59 -
Page 66
PT GOLDEN ENERGY MINES Tbk                                                                                   PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                       AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                        Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                   As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                            and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                       March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                             (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                             unless Otherwise Stated)


6.   Piutang Usaha                                                                    6.    Trade Receivables

     a.   Berdasarkan Pelanggan                                                             a.     By Customers

                                                                       31 Maret/
                                                                      March 31 ,
                                                                         2025               31 Desember/
                                                                    (Tidak Diaudit/         December 31 ,
                                                                      Unaudited )               2024

          Pihak berelasi (Catatan 35)                                  12.031.064                10.827.962    Related parties (Note 35)

          Pihak ketiga                                                                                         Third parties
             PT Exploitasi Energi Indonesia Tbk                        31.856.220                27.993.393      PT Exploitasi Energi Indonesia Tbk
             PT Dwi Guna Laksana Tbk                                   16.872.131                16.047.902      PT Dwi Guna Laksana Tbk
             PT Hua Chin Aluminum Indonesia                            13.568.493                 9.969.295      PT Hua Chin Aluminum Indonesia
             PT PLN Batubara Niaga                                     10.944.768                 8.367.765      PT PLN Batubara Niaga
             KITAI Resources Ltd., Hong Kong                           10.568.452                 3.494.732      KITAI Resources Ltd., Hong Kong
             China Bai Gui International Trade Limited, Hong Kong      10.308.779                15.330.775      China Bai Gui International Trade Limited, Hong Kong
             PT Obsidian Stainless Steel                                9.565.897                 4.989.188      PT Obsidian Stainless Steel
             Zhejiang Zhongtuo Supply Chain Management Co., Ltd.,                                                Zhejiang Zhongtuo Supply Chain Management Co., Ltd.
                Republik Rayat Cina                                      9.533.805                        -         People's Republic of China
             Tata Power Company Ltd., India                              9.306.076                   62.299      Tata Power Company Ltd., India
             PT Sinergi Laksana Bara Mas                                 8.418.269                8.333.616      PT Sinergi Laksana Bara Mas
             Sharpmax International Hongkong Co., Limited,                                                       Sharpmax International Hongkong Co., Limited,
                Hong Kong                                                6.885.194                        -         Hong Kong
             Indo Tausch Trading DMCC, Uni Emirat Arab                   6.547.161                7.773.810      Indo Tausch Trading DMCC, United Arab Emirates
             PT JSW Steel Global Trade                                           -                8.411.583      PT JSW Steel Global Trade
             GMR Infrastructure Limited, India                                   -                7.163.655      GMR Infrastructure Limited, India
             Datang Group Holdings Limited,                                                                      Datang Group Holdings Limited,
                Republik Rakyat Cina                                                -             6.578.357         People's Republic of China
             Starport Trading and Development Limited,                                                           Starport Trading and Development Limited,
                Hong Kong                                                           -             5.931.926         Hong Kong
             Lain-lain (masing-masing
                dibawah US$ 5.000.000)                                 64.513.676                61.415.784      Others (each below US$ 5,000,000)
          Jumlah pihak ketiga                                         208.888.921             191.864.080        Total third parties

          Jumlah                                                      220.919.985             202.692.042        Total

     b.   Berdasarkan Umur Piutang                                                          b.     By Age

                                                                       31 Maret/
                                                                      March 31 ,
                                                                         2025               31 Desember/
                                                                    (Tidak Diaudit/         December 31,
                                                                      Unaudited )               2024

          Belum jatuh tempo                                           191.903.873             180.629.358      Not yet due
          Jatuh tempo                                                                                          Past due
            Kurang dari 1 bulan                                         21.748.156               18.076.061      Less than 1 month
            1 bulan - 2 bulan                                            5.841.079                3.616.297      1 month - 2 months
            2 bulan - 3 bulan                                                    -                        -      2 months - 3 months
            Lebih dari 3 bulan                                           1.426.877                  370.326      More than 3 months

          Jumlah                                                      220.919.985             202.692.042      Total

     c.   Berdasarkan Mata Uang                                                             c.     By Currency

                                                                   31 Maret/
                                                                  March 31 ,
                                                                     2025                  31 Desember/
                                                                (Tidak Diaudit/            December 31 ,
                                                                  Unaudited )                  2024

          Dolar Amerika Serikat                                       84.258.247              82.231.076      United States Dollar
          Rupiah (Catatan 36)                                        136.661.738             120.460.966      Rupiah (Note 36)

          Jumlah                                                     220.919.985             202.692.042      Total




                                                                           - 60 -
Page 67
PT GOLDEN ENERGY MINES Tbk                                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                  unless Otherwise Stated)


     Piutang usaha tertentu milik Grup dijaminkan atas                           Certain trade receivables owned by the Group were
     pinjaman dari PT Bank Danamon Indonesia Tbk dan                             used as collateral on loan from PT Bank Danamon
     PT Bank Mandiri (Persero) Tbk (Catatan 14).                                 Indonesia Tbk and PT Bank Mandiri (Persero) Tbk
                                                                                 (Note 14).

     Cadangan kerugian kredit untuk piutang usaha telah                          Allowance for credit losses for trade receivables has
     diukur sejumlah ECL sepanjang umur. ECL pada                                been measured at an amount equal to lifetime ECL.
     piutang usaha diestimasi berdasarkan matriks                                The ECL on trade receivables are estimated using
     provisi dengan mengacu pada pengalaman gagal                                a provision matrix by reference to past default
     bayar debitur masa lalu dan analisis posisi                                 experience of the debtor and an analysis of the
     keuangan debitur saat ini, disesuaikan dengan                               debtor’s current financial position, adjusted for
     faktor-faktor yang spesifik dari debitur dan kondisi                        factors that are specific to the debtors and general
     ekonomi umum industri di mana debitur beroperasi.                           economic conditions of the industry in which the
     Manajemen menentukan bahwa piutang usaha                                    debtors operate. Management determines the trade
     memiliki kerugian kredit yang tidak material,                               receivables are subject to immaterial credit loss,
     sehingga tidak ada pembentukan cadangan                                     hence no allowance for credit losses for trade
     kerugian kredit untuk piutang usaha.                                        receivables have been recognized.

     Manajemen berpendapat bahwa tidak terdapat                                  Management believes that there is no significant
     risiko terkonsentrasi secara signifikan atas piutang                        concentration of credit risk on trade receivables
     usaha dari pihak ketiga.                                                    from third parties.


7.   Persediaan                                                            7.    Inventories

                                                       31 Maret/
                                                      March 31 ,
                                                         2025               31 Desember/
                                                    (Tidak Diaudit/         December 31 ,
                                                      Unaudited )               2024

     Batubara                                           35.824.646               22.682.648    Coal
     Suku cadang dan bahan bakar                           505.967                  451.185    Sparepart and fuel

     Jumlah                                             36.330.613               23.133.833    Total

     Persediaan tertentu milik Grup dijaminkan atas                              Certain inventories owned by the Group were used
     pinjaman dari PT Bank Danamon Indonesia Tbk                                 as collateral on loan from PT Bank Danamon
     (Catatan 14).                                                               Indonesia Tbk (Note 14).

     Rincian persediaan yang diasuransikan adalah                                Details of insured inventories are as follows:
     sebagai berikut:

                                                                                                       Nilai Pertanggungan/Sum Insured
                                                                                                        31 Maret/          31 Desember/
              Entitas Anak/                 Perusahaan asuransi/                  Mata Uang/            March 31 ,        December 31 ,
              Subsidiaries                   Insurance company                     Currency                2025                2024

     BORNEO                           PT Lippo General Insurance Tbk                 USD                  20.000.000          20.000.000
     Grup KIM/KIM Group               PT Lippo General Insurance Tbk                 USD                  11.700.000          11.700.000
                                                                      *)
     BSL                                   PT Asuransi Sinarmas                       IDR          190.000.000.000      210.000.000.000
     *) Pihak berelasi (Catatan 35)/ Related party (Note 35)

     Manajemen       berpendapat   bahwa     nilai                               Management believes that the insurance coverage
     pertanggungan asuransi tersebut cukup untuk                                 is adequate to cover possible losses on the assets
     menutup kemungkinan kerugian atas persediaan                                insured.
     yang dipertanggungkan.




                                                                - 61 -
Page 68
PT GOLDEN ENERGY MINES Tbk                                                                                                      PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                          AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                           Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                      As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                               and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                          March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                                (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                                unless Otherwise Stated)


     Manajemen berpendapat bahwa persediaan dapat                                                               Management believes that the inventories can be
     digunakan atau dijual dan nilai realisasi bersihnya                                                        either used or sold and that their net realizable value
     masih melebihi nilai tercatat persediaan pada                                                              exceeds the carrying value of inventories as of
     tanggal 31 Maret 2025 dan 31 Desember 2024.                                                                March 31, 2025 and December 31, 2024.


8.   Uang Muka dan Biaya Dibayar Dimuka                                                                 8.      Advances and Prepaid Expenses

                                                                                  31 Maret/
                                                                                 March 31 ,
                                                                                    2025                     31 Desember/
                                                                               (Tidak Diaudit/               December 31 ,
                                                                                 Unaudited )                     2024

     Uang muka                                                                                                                       Advances
        Pemasok (Catatan 35)                                                       19.717.774                   12.774.088             Suppliers (Note 35)
        Royalti (Catatan 37)                                                        7.951.980                    4.342.548             Royalty (Note 37)
        Jasa penambangan                                                              957.362                      984.374             Mining services
        Karyawan                                                                      779.881                      779.849             Employees
        Jasa bantuan manajemen                                                                                                         Management assistance services
           (Catatan 37)                                                                 334.579                      343.398              (Note 37)
     Biaya dibayar di muka                                                                                                           Prepaid expenses
        Asuransi (Catatan 35)                                                      19.666.124                   11.640.901             Insurance (Note 35)
        Lain-lain                                                                     390.210                      157.557             Others
     Lain-lain                                                                      1.127.830                      800.196           Others

     Jumlah                                                                        50.925.740                   31.822.911           Total



9.   Aset Tetap                                                                                         9.      Property and Equipment
                                                                               Perubahan selama periode 2025 (Tiga bulan)/
                                                                                  Changes during 2025 (Three months)
                                                             Selisih Kurs
                                                             Penjabaran/
                                                               Foreign                                                                               31 Maret 2025/
                                                              Currency                                                                               March 31, 2025
                                          1 Januari 2025/    Translation          Penambahan/            Pengurangan/         Reklasifikasi/          (Tidak diaudit/
                                          January 1, 2025    Adjustment             Additions             Deductions         Reclassifications         Unaudited)

     Harga Perolehan                                                                                                                                                     Cost
     Tanah                                     17.355.403              (320)              121.702                        -                   -             17.476.785    Land
     Bangunan                                  19.318.873           (15.182)               12.741                        -              13.235             19.329.667    Buildings
     Infrastruktur                             59.871.192           (26.216)                    -                        -                   -             59.844.976    Infrastructure
     Mesin dan alat berat                      67.024.921              (296)               40.913                        -             299.625             67.365.163    Machinery and heavy equipment
     Transportasi dan peralatan lainnya         4.523.786                 -                     -                        -                   -              4.523.786    Transportation and other equipment
     Perabot dan perlengkapan kantor           22.358.451            (3.573)              215.935                        -             646.766             23.217.579    Office furniture and fixtures
     Prasarana                                    423.320                 -                     -                        -                   -                423.320    Leasehold improvements
     Aset dalam penyelesaian                    9.535.972                 -             2.856.954                        -            (959.626)            11.433.300    Construction in-progress
     Jumlah                                  200.411.918            (45.587)            3.248.245                        -                       -        203.614.576    Total

     Akumulasi Penyusutan                                                                                                                                                Accumulated Depreciation
     Bangunan                                  (9.473.508)           13.512               (281.215)                      -                       -         (9.741.211)   Buildings
     Infrastruktur                            (28.446.867)           23.453               (790.745)                      -                       -        (29.214.159)   Infrastructure
     Mesin dan alat berat                     (30.666.860)              527             (1.087.359)                      -                       -        (31.753.692)   Machinery and heavy equipment
     Transportasi dan peralatan lainnya        (3.956.685)                1               (103.307)                      -                       -         (4.059.991)   Transportation and other equipment
     Perabot dan perlengkapan kantor          (17.555.437)            3.319               (465.025)                      -                       -        (18.017.143)   Office furniture and fixtures
     Prasarana                                   (423.320)                -                      -                       -                       -           (423.320)   Leasehold improvements
     Jumlah                                   (90.522.677)           40.812             (2.727.651)                      -                       -        (93.209.516)   Total

     Nilai Buku Bersih                       109.889.241                                                                                                  110.405.060    Net Book Value




                                                                                              - 62 -
Page 69
PT GOLDEN ENERGY MINES Tbk                                                                                               PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                   AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                    Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                               As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                        and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                   March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                         (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                         unless Otherwise Stated)

                                                                                 Perubahan selama tahun 2024/
                                                                                     Changes during 2024
                                                            Selisih Kurs
                                                            Penjabaran/
                                                              Foreign
                                                             Currency
                                         1 Januari 2024/    Translation        Penambahan/          Pengurangan/          Reklasifikasi/         31 Desember 2024/
                                         January 1, 2024    Adjustment           Additions           Deductions          Reclassifications       December 31, 2024

    Harga Perolehan                                                                                                                                                   Cost
    Tanah                                     17.440.499           (85.096)                 -                     -                     -               17.355.403    Land
    Bangunan                                  17.947.292           (28.607)            25.769                     -             1.374.419               19.318.873    Buildings
    Infrastruktur                             47.477.843           179.635             11.848                     -            12.201.866               59.871.192    Infrastructure
    Mesin dan alat berat                      62.456.166             1.627             93.430                     -             4.473.698               67.024.921    Machinery and heavy equipment
    Transportasi dan peralatan lainnya         4.499.869           (16.656)            63.897               (23.324)                    -                4.523.786    Transportation and other equipment
    Perabot dan perlengkapan kantor           17.194.035           (17.543)         1.301.783               (45.533)            3.925.709               22.358.451    Office furniture and fixtures
    Prasarana                                    423.320                 -                  -                     -                     -                  423.320    Leasehold improvements
    Aset dalam penyelesaian                   14.499.380           (52.714)        17.064.998                     -           (21.975.692)               9.535.972    Construction in-progress
    Jumlah                                  181.938.404            (19.354)        18.561.725               (68.857)                         -         200.411.918    Total

    Akumulasi Penyusutan                                                                                                                                              Accumulated Depreciation
    Bangunan                                  (8.362.161)           24.993          (1.136.340)                      -                       -          (9.473.508)   Buildings
    Infrastruktur                            (25.739.111)           42.224          (2.749.980)                      -                       -         (28.446.867)   Infrastructure
    Mesin dan alat berat                     (26.502.320)              123          (4.164.663)                      -                       -         (30.666.860)   Machinery and heavy equipment
    Transportasi dan peralatan lainnya        (3.509.442)           17.447            (488.014)                 23.324                       -          (3.956.685)   Transportation and other equipment
    Perabot dan perlengkapan kantor          (13.474.121)           19.380          (4.146.229)                 45.533                       -         (17.555.437)   Office furniture and fixtures
    Prasarana                                   (423.320)                -                   -                       -                       -            (423.320)   Leasehold improvements
    Jumlah                                   (78.010.475)          104.167         (12.685.226)                 68.857                       -         (90.522.677)   Total

    Nilai Buku Bersih                       103.927.929                                                                                                109.889.241    Net Book Value


   Beban penyusutan dialokasikan sebagai berikut:                                                         Depreciation expense was allocated as follows:

                                                                                Tiga bulan/Three months
                                                                                   31 Maret/March 31,
                                                                                (Tidak Diaudit/Unaudited )
                                                                                2025                2024

    Beban pokok penjualan (Catatan 26)                                             486.699                   519.302            Cost of revenues (Note 26)
    Beban penjualan (Catatan 27)                                                   876.650                   833.091            Selling expenses (Note 27)
    Beban umum dan administrasi (Catatan 28)                                     1.364.302                 2.477.527            General and administrative expenses (Note 28)

    Jumlah                                                                       2.727.651                 3.829.920            Total


   Rincian aset dalam penyelesaian adalah sebagai                                                         Details of construction in-progress are as follows:
   berikut:
                                                                  Persentase Penyelesaian                     Estimasi
                                                                   tanggal 31 Maret 2025/                   Penyelesaian/                          31 Maret/                   31 Desember/
               Aset dalam Penyelesaian/                           Percentage of Completion                   Estimated                             March 31 ,                  December 31 ,
               Construction in-progress                             as of March 31, 2025                     Completion                              2025                          2024

    Bangunan/Buildings                                                        20% - 95%                     Desember/                                   1.275.377                       1.110.498
                                                                                                          December 2025
    Infrastruktur/Infrastructure                                              20% - 95%                     Desember/                                   5.744.277                       3.958.026
                                                                                                          December 2025
    Mesin dan alat berat/                                                     20% - 95%                     Desember/                                      166.765                         182.212
    Machinery and heavy equipment                                                                         December 2025
    Perabot dan perlengkapan kantor/                                          20% - 95%                     Desember/                                   4.246.882                       4.285.236
    Office furniture and fixtures                                                                         December 2025

    Jumlah/Total                                                                                                                                      11.433.301                        9.535.972




                                                                                          - 63 -
Page 70
PT GOLDEN ENERGY MINES Tbk                                                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                   unless Otherwise Stated)


    Rincian aset yang diasuransikan adalah sebagai                                                Details of insured assets are as follows:
    berikut:
                                                                                                     Nilai Pertanggungan/Sum Insured
                                                                                                     31 Maret/           31 Desember/
                                                   Perusahaan asuransi/             Mata Uang/       March 31 ,          December 31 ,
                Jenis Aset                          Insurance company                Currency           2025                 2024                       Asset Type

    Kendaraan                                     PT Asuransi Sinarmas *)              IDR             290.000.000          290.000.000   Vehicles
                                                  PT Asuransi Sinarmas *)              IDR           3.329.998.000        3.329.998.000

    Fasilitas sipil dan peralatan             PT Lippo General Insurance Tbk           USD             80.307.021            80.307.021   Civil facilities and mechanical and
      mekanik dan elektrik di lokasi                                                                                                         electrical equipment at Port
      Port Bunati, Kecamatan Satui,                                                                                                          Bunati, Satui Subdistrict,
      Kalimantan Selatan                                                                                                                     South Kalimantan

    Mesin dalam bangunan kantor dan           PT Lippo General Insurance Tbk           IDR          40.040.225.174       40.040.225.174   Machinery in office building and
      basecamp di Desa Angsana,                                                                                                             basecamp located at Angsana
      Kabupaten Tanah Bumbu,                                                                                                                Village, Tanah Bumbu District,
      Kalimantan Selatan                                                                                                                    South Kalimantan

    Bangunan, infrastruktur, mesin dan        PT Lippo General Insurance Tbk           USD               2.100.000            2.100.000   Building, infrastructure, machinery
      peralatan lainnya di Tanjung                                                                                                          and other equipment located at
      Belit, Kecamatan Jujuhan,                                                                                                             Tanjung Belit, Jujuhan Subdistrict
      Jambi                                                                                                                                 Jambi

    Bangunan kantor dan basecamp              PT Lippo General Insurance Tbk           IDR          77.147.678.816       77.147.678.816   Office building and basecamp located
      di Desa Angsana,                                                                                                                       at Angsana Village,
      Kabupaten Tanah Bumbu,                                                                                                                 Tanah Bumbu District,
      Kalimantan Selatan                                                                                                                     South Kalimantan

    Mesin dan alat berat KIM dan BNP,           PT Asuransi FPG Indonesia              IDR            900.000.000         1.050.000.000   Machinery and heavy equipment
      entitas anak                                                                                                                          of KIM and BNP, subsidiaries

    Contractor's plant and machinery          PT Lippo General Insurance Tbk           IDR          49.836.974.332       49.836.974.332   Contractor's plant and machinery
      insurance                                 PT Asuransi Wahana Tata                USD               1.351.202            1.351.202     insurance

    Property all risk and                PT Asuransi Adira and PT Asuransi Kresna      IDR         526.577.758.012      796.977.758.012   Property all risk and
       earthquake insurance                                                                                                                  earthquake insurance

    *) Pihak berelasi (Catatan 35) / Related party (Note 35)


    Manajemen      berpendapat      bahwa   nilai                                                 Management believes that the insurance coverage
    pertanggungan tersebut cukup untuk menutup                                                    is adequate to cover possible losses on the assets
    kemungkinan     kerugian   atas   aset yang                                                   insured.
    dipertanggungkan.

    Pada tanggal 31 Maret 2025 dan 31 Desember                                                    As of March 31, 2025 and December 31, 2024,
    2024, aset tetap tertentu dijaminkan atas pinjaman                                            certain property and equipment were used as
    dari PT Bank Mandiri (Persero) Tbk (Catatan 14).                                              collateral on loan from PT Bank Mandiri
                                                                                                  (Persero) Tbk (Note 14).

    Pada tanggal 31 Maret 2025 dan 31 Desember                                                    As of March 31, 2025 and December 31, 2024,
    2024, berdasarkan evaluasi manajemen, tidak                                                   based on management’s assessment, there are no
    terdapat kejadian, kondisi, atau perubahan keadaan                                            events, conditions or changes in circumstances
    yang mengindikasikan adanya penurunan nilai aset                                              which may indicate impairment in the value of the
    tetap Grup.                                                                                   Group’s property and equipment.

    Seluruh aset tetap adalah atas nama Grup.                                                     All of the property and equipment is under the name
                                                                                                  of the Group.


10. Aset Eksplorasi dan Evaluasi                                                             10. Exploration and Evaluation Assets

    Akun ini merupakan biaya sehubungan dengan                                                    This account comprises deferred costs related to
    penyelidikan umum, biaya perizinan, biaya                                                     general investigation, licenses, feasibility study,
    feasibility study, biaya konstruksi dan pembukaan                                             construction and infrastructure, drilling and
    sarana dan biaya pemboran dan eksplorasi yang                                                 exploration for Musi Banyuasin and Dharmasraya
    ditangguhkan untuk area Musi Banyuasin dan                                                    areas, which have not yet reached production stage
    Dharmasraya, yang pada tanggal laporan posisi                                                 as of the consolidated statement of financial
    keuangan konsolidasian belum mencapai tahap                                                   position dates.
    produksi.



                                                                                    - 64 -
Page 71
PT GOLDEN ENERGY MINES Tbk                                                                                                   PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                       AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                        Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                   As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                            and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                       March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                             (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                             unless Otherwise Stated)


   Pada tanggal 31 Maret 2025 dan 31 Desember                                                                 As of March 31, 2025 and December 31, 2024,
   2024, berdasarkan evaluasi manajemen, tidak                                                                based on management’s assessment, there are no
   terdapat kejadian, kondisi, atau perubahan keadaan                                                         events, conditions or changes in circumstances
   yang mengindikasikan adanya penurunan nilai aset                                                           which may indicate impairment in the value of the
   eksplorasi dan evaluasi Grup.                                                                              Group’s exploration and evaluation assets.


11. Aset Pertambangan                                                                               11. Mine Properties
                                                                                                                      Aset Pertambangan
                                                                                               Aset Aktivitas           dari Kombinasi
                                                   Tambang dalam                               Pengupasan                    Bisnis/
                                                   Pengembangan/       Tambang pada           Lapisan Tanah/           Mine Properties
                                                    Mines Under        Tahap Produksi/       Stripping Activity         from Business      Jumlah/
                                                    Construction       Producing Mines             Asset                 Combination        Total


   Biaya perolehan pada tanggal 1 Januari 2024          87.351.132           86.604.325            138.219.370              104.469.940    416.644.767     Cost as of January 1, 2024
      Penambahan                                        86.852.864                    -                      -                        -     86.852.864       Addition
      Ditransfer ke tambang pada
          tahap produksi                              (141.113.503)         141.113.503                           -                   -               -       Transfer to producing mines
                                                                                                                                                              Foreign exchange differences arising
      Selisih kurs penjabaran laporan keuangan             (86.134)            (124.309)                 (2.833)                      -        (213.276)         from financial statements translation

   Biaya perolehan pada tanggal 31 Desember 2024        33.004.359          227.593.519            138.216.537              104.469.940    503.284.355     Cost as of December 31, 2024
      Penambahan                                             1.038                    -                833.810                        -        834.848       Addition
                                                                                                                                                             Foreign exchange differences arising
      Selisih kurs penjabaran laporan keuangan                     -           (309.120)                          -                   -        (309.120)         from financial statements translation

   Biaya perolehan pada tanggal
      31 Maret 2025                                     33.005.397          227.284.399            139.050.347              104.469.940    503.810.083     Cost as of March 31, 2025


   Akumulasi amortisasi pada tanggal                                                                                                                       Accumulated amortization as of
     1 Januari 2024                                                -        (41.248.837)          (113.945.290)              (4.704.552)   (159.898.679)      January 1, 2024
     Beban tahun berjalan                                          -        (24.813.152)            (1.357.940)                (436.776)    (26.607.868)      Charge for the year
     Rugi penurunan nilai                                          -         (4.175.483)                     -               (3.660.004)     (7.835.487)      Impairment losses
                                                                                                                                                              Foreign exchange differences arising
      Selisih kurs penjabaran laporan keuangan                     -             11.219                           -                   -         11.219           from financial statements translation
   Akumulasi amortisasi pada tanggal                                                                                                                       Accumulated amortization as of
     31 Desember 2024                                              -        (70.226.253)          (115.303.230)              (8.801.332)   (194.330.815)      December 31, 2024
     Beban periode berjalan                                        -         (3.576.029)               (87.469)                 (30.308)     (3.693.806)      Charge for the period
                                                                                                                                                              Foreign exchange differences arising
      Selisih kurs penjabaran laporan keuangan                     -            309.119                           -                   -        309.119           from financial statements translation
   Akumulasi amortisasi pada tanggal                                                                                                                       Accumulated amortization as of
     31 Maret 2025                                                 -        (73.493.163)          (115.390.699)              (8.831.640)   (197.715.502)      March 31, 2025

   Nilai tercatat pada tanggal 1 Januari 2024           87.351.132           45.355.488             24.274.080               99.765.388    256.746.088     Net book value as of January 1, 2024

   Nilai tercatat pada tanggal 31 Desember 2024         33.004.359          157.367.266             22.913.307               95.668.608    308.953.540     Net book value as of December 31, 2024

   Nilai tercatat pada tanggal 31 Maret 2025
      (Tidak diaudit)                                   33.005.397          153.791.236             23.659.648               95.638.300    306.094.581     Net book value as of Maret 31, 2025 (Unaudited)



   Pada tahun 2024, berdasarkan hasil dari pengujian                                                          In 2024, based on the results of impairment testing
   penurunan nilai yang dilakukan atas Goodwill                                                               performed on its goodwill (Note 32), the Group
   (Catatan 32), Grup mencatat kerugian penurunan                                                             recognized impairment losses on the mine
   nilai atas aset pertambangan BSA, WRL dan TKS                                                              properties of BSA, WRL and TKS amounting to
   sebesar US$ 7.835.487.                                                                                     US$ 7,835,487.

   Amortisasi aset pertambangan - tambang pada                                                                Amortization of mine properties - producing mines
   tahap produksi dan aset aktivitas pengupasan                                                               and stripping activity asset are presented as part of
   lapisan tanah diakui sebagai bagian dari “Beban                                                            "Cost of revenues" (Note 26) in profit or loss.
   pokok penjualan” (Catatan 26) dalam laba rugi.

   Amortisasi aset pertambangan - aset pertambangan                                                           Amortization of mine properties - mine properties
   dari kombinasi bisnis diakui sebagai bagian dari                                                           from business combination is presented as part of
   “Lain-lain - bersih” (Catatan 30) dalam laba rugi.                                                         “Others - net” (Note 30) in profit or loss.




                                                                                           - 65 -
Page 72
PT GOLDEN ENERGY MINES Tbk                                                                PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                     Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                         and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                    March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                          (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                          unless Otherwise Stated)


12. Aset Tidak Berwujud - Piranti Lunak - Bersih                      12. Intangible Asset - Software - Net

    Mutasi piranti lunak sebagai berikut:                                 Movement of software follows:

                                                  31 Maret/
                                                 March 31 ,
                                                    2025           31 Desember/
                                               (Tidak Diaudit/     December 31 ,
                                                 Unaudited )           2024

    Harga perolehan                                                                    Cost
    Saldo awal                                       2.721.192           2.663.667     Beginning balance
    Penambahan                                           2.063              57.207     Additions
                                                                                       Exchange difference, due to
    Selisih kurs penjabaran laporan keuangan               (190)                 318     financial statement translation
    Jumlah                                           2.723.065           2.721.192     Total
    Akumulasi amortisasi                                                               Accumulated amortization
    Saldo awal                                       2.704.102           2.645.805     Beginning balance
    Amortisasi                                           6.887              57.979     Amortization
                                                                                       Exchange difference, due to
    Selisih kurs penjabaran laporan keuangan               (189)                 318     financial statement translation
    Jumlah                                           2.710.800           2.704.102     Total

    Bersih                                              12.265              17.090     Net

    Alokasi beban amortisasi adalah sebagai berikut:                      The allocation of amortization expense follows:

                                                    Tiga bulan/Three months
                                                       31 Maret/March 31,
                                                    (Tidak Diaudit/Unaudited )
                                               (Tidak Diaudit/
                                                    2025                 2024

    Beban pokok penjualan (Catatan 26)                   6.743               1.638     Cost of revenues (Note 26)
    Beban umum administrasi (Catatan 28)                   144               5.611     General and administrative expenses (Note 28)

    Jumlah                                               6.887               7.249     Total



13. Aset Tidak Lancar Lainnya                                         13. Other Non-current Assets

                                                  31 Maret/
                                                 March 31 ,
                                                    2025           31 Desember/
                                               (Tidak Diaudit/     December 31 ,
                                                 Unaudited )           2024

    Biaya dibayar di muka                                                              Prepaid expense
       Penggarapan lahan                          25.432.185            25.676.953       Land exploitation
    Uang jaminan                                                                       Guarantee deposits
       Jasa penambangan                             3.436.470            2.538.361       Mining services
       Kerusakan lahan (Catatan 37)                 1.434.772            1.472.590       Land damage (Note 37)
       Reklamasi (Catatan 37)                       1.168.192              913.131       Reclamation (Note 37)
       Pengelolaan jalan (Catatan 37)                 690.873              761.044       Road maintenance (Note 37)
       Sewa gedung, kendaraan dan                                                        Building, vehicle, and heavy
          alat berat (Catatan 35)                     240.921              247.271          equipment rental (Note 35)
       Lain-lain                                    3.776.491            3.788.911       Others
    Uang muka                                                                          Advances
       Kompensasi tanah                              473.816               484.463       Land compensation
       Pembelian aset tetap                          157.107               157.107       Purchase of property and equipment
    Taksiran tagihan pajak (Catatan 33)           24.761.382            24.907.787     Estimated claims for tax refund (Note 33)
    Lain-lain (Catatan 35)                         2.287.079             2.195.148     Others (Note 35)

    Jumlah                                        63.859.288            63.142.766     Total




                                                             - 66 -
Page 73
PT GOLDEN ENERGY MINES Tbk                                                                                                      PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                          AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                           Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                      As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                               and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                          March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                                (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                                unless Otherwise Stated)


14. Utang Bank                                                                                            14. Bank Loans
                                                   Jumlah Maksimum Fasilitas Pinjaman/
                                                      Maximum Credit Facilities Limit             Saldo Terutang/Outstanding Balances
                                                     31 Maret/                                        31 Maret/                              Jumlah
                                                    March 31 ,                                       March 31 ,                           Pembayaran
                                                       2025              31 Desember/                   2025           31 Desember/       Selama 2025/
                                                  (Tidak Diaudit/        December 31 ,             (Tidak Diaudit/     December 31 ,       Repayment
                                                    Unaudited )                2024                  Unaudited )            2024         amounts in 2025

    Jangka Pendek                                                                                                                                          Short-term
    RCI                                                                                                                                                    RCI
    PT Bank Danamon Indonesia Tbk                                                                                                                          PT Bank Danamon Indonesia Tbk
    (Bank Danamon)                                                                                                                                         (Bank Danamon)
       Omnibus Trade Non                                                                                                                                      Omnibus Trade Non
          Cash Backed                                    5.000.000                   5.000.000                    -                  -                 -         Cash Backed
    PT Bank Mandiri (Persero) Tbk                                                                                                                          PT Bank Mandiri (Persero) Tbk
    (Bank Mandiri)                                                                                                                                         (Bank Mandiri)
       Tranche B - Term loan revolving                 110.000.000                110.000.000              994.695           1.113.724         3.924.164      Tranche B - Revolving term loan
    BSL                                                                                                                                                    BSL
    Bank Mandiri                                                                                                                                           Bank Mandiri
       Kredit Modal Kerja *)                      150.000.000.000              150.000.000.000                    -                  -                 -      Working Capital Loan *)
    PT Bank Rakyat Indonesia (Persero) Tbk                                                                                                                 PT Bank Rakyat Indonesia (Persero) Tbk
    (Bank BRI)                                                                                                                                             (Bank BRI)
       Kredit Modal Kerja *)                      225.000.000.000              225.000.000.000                    -          3.915.790         6.454.441      Working Capital Loan *)
    BORNEO                                                                                                                                                 BORNEO
    Bank BRI                                                                                                                                               Bank BRI
       Kredit Modal Kerja *)                     2.200.000.000.000        2.200.000.000.000            21.264.613           74.004.018        75.120.122      Working Capital Loan *)
    Bank Mandiri                                                                                                                                           Bank Mandiri
       Tranche B - Term loan revolving                 110.000.000              110.000.000            90.000.000          105.000.000      280.000.000       Tranche B - Revolving term loan
       Kredit Modal Kerja *)                     2.050.000.000.000        2.050.000.000.000            16.817.098              847.992        2.256.914       Working Capital Loan *)
    PT Bank Negara Indonesia (Persero) Tbk                                                                                                                 PT Bank Negara Indonesia (Persero) Tbk
    (Bank BNI)                                                                                                                                             (Bank BNI)
       Kredit Modal Kerja *)                     1.950.000.000.000        1.950.000.000.000               5.940.342         57.178.645        56.711.304      Working Capital Loan *)
    Lembaga Pembiayaan Ekspor                                                                                                                              Lembaga Pembiayaan Ekspor
       Indonesia (Indonesia Eximbank)                                                                                                                         Indonesia (Indonesia Eximbank)
       Kredit Modal Kerja                                5.000.000                   5.000.000                    -                  -                 -      Working Capital Loan
    Jumlah jangka pendek                                                                             135.016.748           242.060.169                     Total short-term

    Jangka panjang yang
      akan jatuh tempo dalam
      waktu satu tahun                                                                                                                                     Current portion of long-term
    BORNEO                                                                                                                                                 BORNEO
    Bank Mandiri                                                                                                                                             Bank Mandiri
      Tranche A - Term loan                             50.000.000                 50.000.000          10.000.000           10.000.000         2.500.000     Tranche A - Term loan
    Jumlah                                                                                             10.000.000           10.000.000                     Sub-total


    Jangka panjang-setelah dikurangi
       bagian yang akan jatuh tempo                                                                                                                        Long term-net of
      dalam waktu satu tahun                                                                                                                                 current portion
    BORNEO                                                                                                                                                 BORNEO
    Bank Mandiri                                                                                                                                             Bank Mandiri
      Tranche A - Term loan                             50.000.000                 50.000.000          27.500.000           30.000.000                 -     Tranche A - Term loan

    Jumlah                                                                                             27.500.000           30.000.000                     Sub-total

    Jumlah jangka panjang                                                                              37.500.000           40.000.000                     Total long-term

    Jumlah utang bank                                                                                172.516.748           282.060.169                     Total bank loans

   *)
        Fasilitas pinjaman dalam mata uang Rupiah/ Loan facilities in Rupiah


   Rincian tanggal jatuh tempo dan jaminan                                                                       The details of maturities and collaterals related with
   sehubungan dengan fasilitas utang bank pada                                                                   bank loans as of March 31, 2025 are as follows:
   tanggal 31 Maret 2025 adalah sebagai berikut:

        Nama Bank/                                                                    Jatuh Tempo/
        Bank Name                             Jenis/Type                                Maturities                                             Jaminan/Collateral

   Bank Danamon                         Omnibus Trade Non                            17 Maret 2026/                   a.   Fidusia piutang dan/atau persediaan dengan nilai
                                          Cash Backed                                March 17, 2026                        penjamin sekurang-kurangnya US$ 11.000.000, yang
                                                                                                                           akan diikat dalam bentuk dan isi yang disetujui oleh
                                                                                                                           Bank/Fiduciary receivables and/or inventory with a
                                                                                                                           guarantor value of at least US$ 11,000,000, which will be
                                                                                                                           bound in the form and content approved by the Bank;
                                                                                                                      b.   Margin deposit (trade cash margin, current account, time
                                                                                                                           deposit) sebesar 35% dari jumlah Fasilitas Omnibus Trade
                                                                                                                           Non Cash Backed, maksimum US$ 5.000.000 yang akan
                                                                                                                           diikat dalam bentuk dan isi yang disetujui oleh Bank/
                                                                                                                           Margin deposit (trade cash margin, current account, time
                                                                                                                           deposit) at 35% of the amount of Omnibus Trade Non
                                                                                                                           Cash Backed facility, maximum US$ 5,000,000 to be
                                                                                                                           bound in the form and contents approved by the Bank.


                                                                                                 - 67 -
Page 74
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)

     Nama Bank/                                 Jatuh Tempo/
     Bank Name            Jenis/Type              Maturities                                   Jaminan/Collateral

   Bank BRI           Kredit Modal Kerja/    25 September 2025            Blokir saldo simpanan dalam mata uang Dolar Amerika Serikat
                     Working Capital Loan      dan pembayaran             yang mengcover setiap pencairan dalam mata uang Rupiah/
                                            pinjaman maksimal 3           Block saving balance in USD which covers every loan
                                            bulan sejak pencairan         drawdown in Rupiah.
                                               kredit dilakukan/
                                             September 25, 2025
                                              and maximum loan
                                             repayment 3 months
                                             after drawdown date

   Bank BNI           Kredit Modal Kerja/     23 November 2025            Blokir saldo simpanan dalam mata uang Dolar Amerika Serikat
                     Working Capital Loan      dan pembayaran             yang mengcover setiap pencairan dalam mata uang Rupiah/
                                            pinjaman maksimal 3           Block saving balance in USD which covers every loan
                                            bulan sejak pencairan         drawdown in Rupiah.
                                               kredit dilakukan/
                                             November 23, 2025
                                              and maximum loan
                                             repayment 3 months
                                             after drawdown date

   Bank Mandiri       Kredit Modal Kerja/   19 Oktober 2025 dan           Blokir saldo simpanan dalam mata uang Dolar Amerika Serikat
                     Working Capital Loan    pelunasan pinjaman           yang mengcover setiap pencairan dalam mata uang Rupiah/
                                               maksimal 3 bulan           Block saving balance in USD which covers every loan
                                            sejak pencairan kredit        drawdown in Rupiah.
                                                   dilakukan/
                                            October 19, 2025 and
                                                maximum loan
                                             repayment 3 months
                                             after drawdown date

   Bank Mandiri        Tranche A - Term      23 Desember 2028/           a.   Gadai atas 99,0701% saham BORNEO (yang dimiliki oleh
                            Loan             December 23, 2028                RCI)/Pledge of 99.0701% of BORNEO shares (owned by
                                                                              RCI);
                        Tranche B –                                      b.   Gadai atas 99,01% saham RCI (yang dimiliki oleh
                       Revolving Term                                         GEMS)/Pledge of 99.01% of RCI shares (owned by
                          Loan *)                                             GEMS);
                                                                         c.   Gadai atas 99,9998% saham KIM (yang dimiliki oleh
                                                                              GEMS)/Pledge of 99.9998% of KIM's shares (owned by
                                                                              GEMS);
                                                                         d.   Gadai 100% saham BSL (yang dimiliki oleh GEMS,
                                                                              UNSOCO, dan DSI)/Pledge of 100% of BSL’s shares
                                                                              (owned by GEMS, UNSOCO and DSI);
                                                                         e.   Tanah, bangunan, mesin dan peralatan atas nama
                                                                              BORNEO/Land, buildings, machinery and equipment and
                                                                              vehicles on behalf of BORNEO;
                                                                         f.   Tanah, bangunan, mesin dan peralatan atas nama KIM,
                                                                              TBBU, KCP, GEMS dan BNP/Land, buildings, machinery
                                                                              and equipment on behalf of KIM, TBBU, KCP, GEMS and
                                                                              BNP;
                                                                         g.   Gadai rekening atas nama Para Debitur di Bank (rekening
                                                                              yang ditujukan untuk penerimaan, operasional dan
                                                                              pembayaran kewajiban)/Pledge of accounts in the name
                                                                              of the Debtors in the Bank (accounts intended for the
                                                                              receipt, operation and payment of obligations);
                                                                         h.   Aset tetap, berupa mesin dan peralatan dari BSL/Fixed
                                                                              assets, in the form of machinery and equipment from BSL;
                                                                         i.   Jaminan fidusia atas klaim asuransi atas nama BORNEO,
                                                                              KIM dan BSL/Fiduciary guarantees on insurance claims on
                                                                              behalf of BORNEO, KIM and BSL;
                                                                         j.   Jaminan fidusia atas piutang atas nama BORNEO, KIM
                                                                              dan BSL/Fiduciary guarantees on BORNEO, KIM and
                                                                              BSL’s receivables.




                                                       - 68 -
Page 75
PT GOLDEN ENERGY MINES Tbk                                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                        unless Otherwise Stated)

      Nama Bank/                                                  Jatuh Tempo/
      Bank Name                       Jenis/Type                    Maturities                                      Jaminan/Collateral

   Lembaga                    Kredit Modal Kerja/                   1 Tahun/                  Blokir saldo simpanan dalam mata uang Dolar Amerika Serikat
   Pembiayaan                Working Capital Loan                    1 Year                   yang mengcover setiap pencairan dalam mata uang Rupiah/
   Ekspor Indonesia/                                                                          Block saving balance in USD which covers every loan
   Indonesia                                                                                  drawdown in Rupiah
   Eximbank

   *) PT Bank Mega Tbk (Bank Mega) menjadi Kreditur Tambahan dalam Perjanjian Kredit Sindikasi atas limit akordian pada fasilitas Tranche B –
      Revolving Term Loan dengan limit maksimal sebesar US$ 20.000.000/
      PT Bank Mega Tbk (Bank Mega) becomes an Additional Creditor in the Syndicated Credit Agreement for the accordion limit on the Tranche B –
      Revolving Term Loan facility with a maximum limit of US$ 20,000,000.

   Kisaran tingkat suku bunga tahunan pada utang                                        The range of annual interest rates of the long-term
   bank jangka panjang adalah sebagai berikut:                                          bank loans are as follows:

                                                               31 Maret/
                                                              March 31 ,
                                                                 2025               31 Desember/
                                                            (Tidak Diaudit/         December 31 ,
                                                              Unaudited )               2024

    Bank Danamon                                                                                       Bank Danamon
      Omnibus Trade Non Cash Backed                                                                      Omnibus Trade Non Cash Backed
        (dalam dolar Amerika Serikat)                            5,50%                 5,50%               (In United States Dollar)
      Omnibus Trade Non Cash Backed                                                                      Omnibus Trade Non Cash Backed
        (dalam Rupiah)                                          11% - 12%            11% - 12%             (in Rupiah)
    Bank BNI                                                                                           Bank BNI
      Kredit Modal Kerja                                         0,35%                 0,35%             Working Capital Loan
    Bank BRI                                                                                           Bank BRI
      Kredit Modal Kerja                                         0,47%                 0,47%             Working Capital Loan
    Bank Mandiri                                                                                       Bank Mandiri
      Kredit Modal Kerja                                         0,40%                 0,40%             Working Capital Loan
      Tranche A - Term Loan                                      6,80%                 7,00%             Tranche A - Term Loan
      Tranche B - Term Loan Revolving                                                                    Tranche B - Revolving Term Loan
        (dalam dolar Amerika Serikat)                            6,80%                 7,00%               (In United States Dollar)
      Tranche B - Term Loan Revolving                                                                    Tranche B - Revolving Term Loan
        (dalam Rupiah)                                           8,25%                 8,25%               (in Rupiah)

   Beban bunga dan bunga pinjaman yang dibayarkan                                       Interest expense and loan interest paid are as
   adalah sebagai berikut:                                                              follows:

                                                                      Tiga bulan/Three months
                                                                         31 Maret/March 31 ,
                                                                      (Tidak Diaudit/Unaudited )
                                                              2025                                   2024
                                                                 Beban bunga yang                       Beban bunga yang
                                               Beban bunga/         dibayarkan/        Beban bunga/        dibayarkan/
                                              Interest expense Loan interest paid    Interest expense Loan interest paid

   Bank Danamon                                                                                                            Bank Danamon
    Omnibus Trade Non Cash Backed                           -                   -             45.691            57.293      Omnibus Trade Non Cash Backed
   Bank Mandiri                                                                                                            Bank Mandiri
    Kredit Modal Kerja                                 3.619               2.386              43.396            45.612      Working Capital Loan
    Tranche A - Term Loan                            655.083             664.222             641.146           552.083      Tranche A - Term Loan
    Tranche B - Term Loan Revolving                  396.962             360.811              68.750            10.417      Tranche B - Revolving Term Loan
   Bank BRI                                                                                                                Bank BRI
    Kredit Modal Kerja                                50.654              56.070              38.160            61.916      Working Capital Loan
   Bank BNI                                                                                                                Bank BNI
    Kredit Modal Kerja                                25.636              30.879              25.079            26.936      Working Capital Loan

   Jumlah                                           1.131.954         1.114.368              862.222           754.257     Total




                                                                         - 69 -
Page 76
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


   Syarat Pinjaman                                                 Loan Covenants

   Bank Danamon                                                    Bank Danamon

   Sesuai dengan ketentuan dalam perjanjian, para                  In accordance with the agreement, the debtors are
   peminjam diharuskan untuk menjaga beberapa                      required to maintain certain financial ratios:
   rasio keuangan:

   a.   Rasio bunga minimal 2x, dan                                a.   Interest coverage ratio minimum 2x, and
   b.   Rasio pendapatan operasi bersih terhadap                   b.   Debt service coverage ratio minimum of 1.2x.
        utang minimal 1,2x.

   Berdasarkan perjanjian fasilitas kredit, Perusahaan             Based on the credit facility agreement, the
   harus mendapatkan persetujuan tertulis dari bank                Company must obtain written approval from the
   terkait kondisi berikut:                                        bank regarding the following conditions:

   a.   Mengambil langkah untuk atau membubarkan                   a.   Take steps for or liquidate the Company;
        Perusahaan;

   b.   Menjual atau dengan cara lain mengalihkan hak              b.   Selling or in other ways transferring rights or
        atau    menyewakan      atau     menyerahkan                    leasing or giving up the use of all or most of the
        pemakaian seluruh atau sebagian besar                           assets or assets of the Company, both
        kekayaan atau aset Perusahaan, baik barang-                     moveable and immovable property owned by
        barang bergerak maupun tidak bergerak milik                     the Company, except for the purpose of running
        Perusahaan,     kecuali      dalam     rangka                   of the Company’s daily business;
        menjalankan usaha Perusahaan sehari-hari;

   c.   Mengadakan perubahan dari sifat dan kegiatan               c.   Making amendment to the nature and activities
        usaha Perusahaan seperti yang sedang                            of the Company’s business as currently being
        dijalankan saat ini; dan                                        carried out; and

   d.   Membayar       atau    membayar       kembali              d.   Pay or repay any loans/claims/receivables that
        pinjaman/tagihan/piutang-piutang       berupa                   are now and/or in the future will be provided by
        apapun juga yang sekarang dan/atau                              the Company’s shareholders in the form of
        dikemudian hari akan diberikan oleh para                        principal, interest and other amounts of fund
        Pemegang Saham Perusahaan baik berupa                           that must be paid.
        jumlah pokok, bunga dan lain-lain jumlah uang
        yang wajib dibayar.

   Berdasarkan perjanjian fasilitas kredit, Perusahaan             Based on the credit facility agreement, the
   harus melakukan pemberitahuan terlebih dahulu                   Company must give prior notification to the bank
   kepada bank terkait kondisi berikut:                            regarding the following conditions:

   a.   Menjaminkan atau mengagunkan dengan cara                   a.   To pledge or used as collateral in any way
        bagaimanapun kekayaan Perusahaan kepada                         regarding to the Company's assets to other
        orang atau pihak lain, kecuali menjaminkan                      people or parties, except providing guarantee
        atau mengagunkan kekayaan kepada bank;                          or collateral assets to the bank;

   b.   Menjamin langsung maupun tidak langsung                    b.   To pledge directly or indirectly to other third
        pihak ketiga lainnya, kecuali melakukan                         parties, except for endorsement of tradable
        endorsemen atas surat-surat yang dapat                          documents for the purpose of payment or
        diperdagangkan untuk keperluan pembayaran                       collection of other transactions commonly
        atau penagihan transaksi-transaksi lain yang                    carried out in business activity;
        lazim dilakukan dalam menjalankan usaha;




                                                         - 70 -
Page 77
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


   c.   Menimbulkan suatu kewajiban atau hutang                    c.   To incur a new obligation or debt or gives or
        baru atau memberikan atau mengizinkan                           allows for an expense or collateral for existing
        adanya suatu beban atau kepentingan jaminan                     or future assets, issue a guarantee or collateral
        atas aset yang telah atau akan ada,                             for the other party’s debt;
        menerbitkan guarantee atau penjaminan atas
        hutang pihak lain;

   d.   Mengubah     Anggaran   Dasar     (termasuk                d.   To amend the Articles of Association (including
        kewenangan Direksi, struktur modal, korum                       the authority of the Board of Directors, capital
        rapat atau bidang usaha) atau mengizinkan                       structure, meeting quorum or business
        adanya perubahan susunan Direksi dan Dewan                      objectives) or allow changes in the composition
        Komisaris    ataupun   pemegang       saham                     of the Board of Directors and the Board of
        Perusahaan; dan                                                 Commissioners         or   the       Company’s
                                                                        shareholders; and

   e.   Melakukan atau mengizinkan terjadinya merger               e.   To conduct or allow a merger or consolidation,
        atau konsolidasi, akuisisi atau mengambil alih                  acquisition or take over all or most of the assets
        seluruh atau sebagian besar dari harta                          or shares of another company, as long as the
        kekayaan atau saham perusahaan lain,                            Company is a survival entity.
        sepanjang Perusahaan sebagai survival entity.

   Pada tanggal 31 Maret 2025 dan 31 Desember                      As of March 31, 2025 and December 31, 2024, the
   2024, para peminjam telah memenuhi persyaratan                  debtors are in compliance with the related terms
   dan ketentuan tersebut.                                         and conditions.

   Bank Mandiri                                                    Bank Mandiri

   Sesuai dengan ketentuan dalam perjanjian fasilitas              In accordance with the credit facility agreement, the
   kredit, para peminjam diharuskan untuk memenuhi                 debtors are required to comply with certain terms
   beberapa persyaratan serta ketentuan mengenai                   and conditions relating to its Articles of Association,
   Anggaran Dasar, kegiatan usaha, aksi korporasi,                 the nature of the business, corporate actions,
   kegiatan pembiayaan, dan lainnya. Para peminjam                 financing activities and other matters. The debtors
   juga diharuskan untuk menjaga beberapa rasio                    also need to maintain certain financial ratios:
   keuangan:

   a.   Rasio total utang terhadap ekuitas maksimal                a.   Debt to equity ratio maximum of 150%, and
        150%, dan
   b.   Rasio pendapatan operasi bersih terhadap                   b.   Debt service coverage ratio (DSCR) minimum
        utang (DSCR) minimal 150%. DSCR dihitung                        of 150%. DSCR is calculated based on the
        atas dasar kondisi keuangan Last Twelve                         financial condition of the Last Twelve Months
        Months (“LTM”).                                                 (“LTM”).

   Berdasarkan perjanjian fasilitas kredit, Perusahaan             Based on the credit facility agreement, the
   harus mendapatkan persetujuan tertulis dari bank                Company must obtain written approval from the
   terkait kondisi berikut:                                        bank regarding the following conditions:

   a.   Menjaminkan aset bergerak maupun tidak                     a.   Pledge existing or non-existing moveable
        bergerak yang telah ada maupun yang akan                        assets of owned by each debtor, except to
        ada milik masing-masing Debitur kecuali untuk                   pledge up to 10% of the Company’s
        menjaminkan sampai dengan 10% dari ekuitas                      consolidated equity value for all transactions in
        Perusahaan konsolidasi untuk keseluruhan                        one financial year;
        transaksi dalam satu tahun buku;

   b.   Memperoleh fasilitas kredit atau pinjaman lain             b.   Obtain credit facilities or other loans from banks
        dari bank atau lembaga keuangan lain, kecuali:                  or other financial institutions, unless:

        1)   Fasilitas kredit atau pinjaman dari bank                   1)   The credit or loan facility from the bank is
             tersebut tidak dijamin dengan aset dari                         not guaranteed with the assets of a Debtor.
             suatu Debitur.


                                                         - 71 -
Page 78
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


        2)   Fasilitas leasing dengan nilai yang tidak                  2)   Leasing facility with an immaterial value,
             material, sepanjang dampak dari fasilitas                       as long as the impact of the credit facility
             kredit tersebut tidak melanggar financial                       does not violate the financial covenant in
             covenant di bank.                                               the bank.

   c.   Terkait dengan ketentuan b di atas, apabila                c.   Related to the point b above, if a Debtor get an
        suatu Debitur mendapatkan penawaran untuk                       offer for the same facility from a bank or other
        fasilitas yang sama dari bank atau lembaga                      financial institution with terms and conditions
        keuangan yang lain dengan syarat dan                            that are better than those provided at the bank,
        ketentuan yang lebih baik dengan yang                           then the Debtor will ask the bank to provide
        diberikan oleh bank, maka Debitur tersebut                      facilities with the same terms and conditions as
        akan meminta bank untuk memberikan fasilitas                    the terms and conditions obtained by the
        dengan syarat dan ketentuan yang sama                           Debtor from the bank or other financial
        dengan syarat dan ketentuan yang diperoleh                      institution;
        Debitur tersebut dari bank atau lembaga
        keuangan lain tersebut;

   d.   Mengajukan permohonan dan/atau menyeluruh                  d.   Submit an application and/or thoroughly the
        pihak lain mengajukan permohonan kepada                         other party submits an application to the Court
        Pengadilan untuk dinyatakan pailit atau                         to be declared bankrupt or request a delay in
        meminta penundaan pembayaran hutang                             loan payment to the authorized institution;
        kepada instansi yang berwenang;

   e.   Membagikan     dividen    BORNEO/KIM/BSL/                  e.   Distribute        BORNEO/KIM/BSL/RCI/KMS
        RCI/KMS     kepada       pemegang    saham                      dividends to BORNEO/KIM/BSL/RCI/KMS
        BORNEO/KIM/BSL/RCI/KMS               kecuali                    shareholders unless the distribution of
        pembagian     dividen     BORNEO/KIM/BSL/                       BORNEO/KIM/BSL/RCI/KMS dividends does
        RCI/KMS tersebut tidak mengakibatkan                            not result in financial covenant violations by
        pelanggaran    financial    covenant   oleh                     BORNEO/KIM/BSL/RCI/KMS;
        BORNEO/KIM/BSL/RCI/KMS;

   f.   Melakukan investasi atau penyertaan (akuisisi)             f.   Make investments or acquisitions in other
        pada perusahaan lain, kecuali:                                  companies, except:
        1) Seluruh financial covenant terpenuhi baik                    1) All financial covenants are fulfilled both
            sebelum maupun setelah dilakukannya                            before and after the investment or
            investasi atau penyertaan (akuisisi);                          acquisition;
        2) Investasi atau penyertaan (akuisisi) berada                  2) Investment or acquisition is in the field of
            pada bidang usaha pertambangan                                 coal mining business or related to mining;
            batubara       atau    terkait      dengan                     and
            pertambangan; dan
        3) Nilai akuisisi tidak melebihi 50% ekuitas                    3)   The acquisition value does not exceed
            Perusahaan.                                                      50% of the Company’s equity.

   g.   Menurunkan modal dasar atau modal disetor.                 g.   Reduce the authorized capital or paid up
                                                                        capital.

   Pada tanggal 31 Maret 2025 dan 31 Desember                      As of March 31, 2025 and December 31, 2024, the
   2024, para peminjam telah memenuhi persyaratan                  debtors are in compliance with the related terms
   dan ketentuan tersebut.                                         and conditions.




                                                         - 72 -
Page 79
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


15. Utang Usaha                                                   15. Trade Payables

   Akun ini merupakan utang Grup kepada pemasok                      This account consists of the Group’s payables to
   dan kontraktor sehubungan dengan kegiatan                         suppliers and contractors in relation to Group’s
   operasional Grup, dengan rincian sebagai berikut:                 operations, with details as follows:

   a.   Berdasarkan Pemasok/Kontraktor                               a.     By Supplier/Contractor

                                                 31 Maret/
                                                March 31 ,
                                                   2025              31 Desember/
                                              (Tidak Diaudit/        December 31 ,
                                                Unaudited )              2024

        Pihak berelasi (Catatan 35)              56.714.311               55.633.959   Related parties (Note 35)

        Pihak ketiga                                                                   Third parties
           PT Putra Perkasa Abadi                91.309.721               66.433.710     PT Putra Perkasa Abadi
           PT Dian Ciptamas Agung                20.300.033               17.411.580     PT Dian Ciptamas Agung
           PT Energi Sinar Tambang               17.669.850               15.573.745     PT Energi Sinar Tambang
           PT Bahari Karya Makmur                12.381.546                8.082.002     PT Bahari Karya Makmur
           PT Toudano Mandiri Abadi               5.468.856                5.536.993     PT Toudano Mandiri Abadi
           PT Karya Halim Sampoerna               1.918.778                6.231.391     PT Karya Halim Sampoerna
           PT Bangun Arta Hutama                  1.004.211                5.601.335     PT Bangun Arta Hutama
           Lain-lain (masing-masing                                                      Others
             dibawah US$ 5.000.000)              70.240.859               67.488.913        (each below US$ 5,000,000)
        Jumlah pihak ketiga                     220.293.854           192.359.669        Total third parties

        Jumlah                                  277.008.165           247.993.628        Total


   b.   Berdasarkan Umur                                             b.     By Age

        Analisa umur utang usaha dihitung dari tanggal                      The aging analysis of trade payables from the
        faktur adalah sebagai berikut:                                      date of invoice follows:

                                                 31 Maret/
                                                March 31 ,
                                                   2025              31 Desember/
                                              (Tidak Diaudit/        December 31 ,
                                                Unaudited )              2024

        Belum jatuh tempo                       203.889.526           168.832.067      Not yet due
        Jatuh tempo:                                                                   Due date:
          Kurang dari 1 bulan                    48.931.215               60.654.297     Less than 1 month
          1 bulan - 2 bulan                       7.573.401                4.179.992     1 month - 2 months
          2 bulan - 3 bulan                       2.513.952                3.729.958     2 months - 3 months
          Lebih dari 3 bulan                     14.100.071               10.597.314     More than 3 months

        Jumlah                                  277.008.165           247.993.628      Total




                                                         - 73 -
Page 80
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


        Berdasarkan Mata Uang                                         c.   By Currency

                                                 31 Maret/
                                                March 31 ,
                                                   2025             31 Desember/
                                              (Tidak Diaudit/       December 31 ,
                                                Unaudited )             2024

        Rupiah (Catatan 36)                     243.160.508          187.835.669    Rupiah (Note 36)
        Dolar Amerika Serikat                    33.847.657           60.157.959    United States Dollar

        Jumlah                                  277.008.165          247.993.628    Total


16. Beban Akrual                                                  16. Accrued Expenses

                                                 31 Maret/
                                                March 31 ,
                                                   2025             31 Desember/
                                              (Tidak Diaudit/       December 31 ,
                                                Unaudited )             2024

    Pemeliharaan dan perbaikan (Catatan 35)       9.128.920             9.271.245   Repairs and maintenance (Note 35)
    Pajak bumi dan bangunan                       3.403.671                     -   Property tax
    Asuransi                                      1.307.657             1.482.090   Insurance
    Royalti (Catatan 37)                            760.327             1.243.408   Royalty (Note 37)
    Jasa profesional                                505.087               821.677   Professional fee
    Sewa                                            315.219               418.697   Rental
    Bunga                                           177.394                59.333   Interest
    Lain-lain                                     3.653.201             3.049.348   Others

    Jumlah                                       19.251.476           16.345.798    Total


17. Aset Hak Guna - Bersih dan Utang Sewa                         17. Right-of-Use Assets - Net and Lease Liabilities

   Grup mempunyai perjanjian sewa untuk berbagai                      The Group has lease contracts for various items of
   item sewa gedung dan kendaraan yang digunakan                      properties and vehicles used in operations. Lease
   untuk operasional. Sewa gedung dan kendaraan                       of properties and vehicles generally have lease term
   mempunyai jangka waktu antara 3 sampai 5 tahun.                    of 3 until 5 years.




                                                         - 74 -
Page 81
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


   Berikut ini adalah nilai dari aset hak guna sewa dan                Below are the carrying amount of right-of-use
   perubahannya di periode berjalan:                                   assets recognized and the movements during
                                                                       the period:

                                                    31 Maret 2025/March 31, 2025
                                                      (Tidak Diaudit/Unaudited )
                                          Properti/          Kendaraan/          Jumlah/
                                         Properties           Vehicles            Total

    Biaya Perolehan                                                                             Cost
    Saldo awal                             5.767.569           4.472.599         10.240.168     Beginning balance
    Penambahan                                42.164              83.069            125.233     Addition
    Selisih kurs                              89.037              (5.559)            83.478     Foreign exchange

    Jumlah                                 5.898.770           4.550.109         10.448.879     Total

    Akumulasi penyusutan                                                                        Accumulated depreciation
    Saldo awal                             3.973.011           4.031.930          8.004.941     Beginning balance
    Beban (Catatan 28)                       560.799              64.365            625.164     Charge (Note 28)
    Selisih kurs                            (473.704)              8.853           (464.851)    Foreign exchange

    Jumlah                                 4.060.106           4.105.148          8.165.254     Total

    Nilai buku bersih                       1.838.664              444.961        2.283.625     Net book value


                                              31 Desember 2024/December 31, 2024
                                          Properti/       Kendaraan/          Jumlah/
                                         Properties        Vehicles            Total

    Biaya Perolehan                                                                              Cost
    Saldo awal                              5.352.020           4.394.847          9.746.867     Beginning balance
    Penambahan                                591.779              83.069            674.848     Addition
    Selisih kurs                             (176.230)             (5.317)          (181.547)    Foreign exchange

    Jumlah                                  5.767.569           4.472.599         10.240.168     Total

    Akumulasi penyusutan                                                                         Accumulated depreciation
    Saldo awal                              3.318.175           3.865.395          7.183.570     Beginning balance
    Beban                                     695.359             201.981            897.340     Charge
    Selisih kurs                              (40.523)            (35.446)           (75.969)    Foreign exchange

    Jumlah                                  3.973.011           4.031.930          8.004.941     Total

    Nilai buku bersih                        1.794.558             440.669          2.235.227    Net book value




                                                          - 75 -
Page 82
PT GOLDEN ENERGY MINES Tbk                                                              PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                  AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                   Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                              As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                       and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                  March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                        (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                        unless Otherwise Stated)


   Berikut ini adalah nilai tercatat liabilitas sewa guna              Set out below are the carrying amount of lease
   usaha dan perubahan selama periode berjalan:                        liabilities and movements during the period:

                                                   31 Maret 2025/March 31, 2025
                                                       (Tidak Diaudit/Unaudited )
                                           Properti/          Kendaraan/          Total/
                                          Properties           Vehicles           Total/

    Saldo awal                                118.947             447.910           566.857     Beginning balance
    Penambahan                                      -               1.192             1.192     Addition
    Penambahan bunga                           23.664               5.976            29.640     Accretion of interest
    Pembayaran                               (175.046)            (54.003)         (229.049)    Payment
    Selisih kurs                              151.381               7.964           159.345     Foreign exchange
    Jumlah                                    118.946             409.039           527.985     Total

    Utang sewa jangka panjang yang
      akan jatuh tempo dalam waktu                                                              Current portion of lease
      satu tahun                               12.171             209.323           221.494       liabilities
    Utang sewa jangka panjang - setelah
      dikurangi bagian yang akan
      jatuh tempo dalam waktu                                                                   Long-term lease liabilities -
      satu tahun                              106.775             199.716           306.491       net of current portion
    Jumlah                                    118.946             409.039           527.985     Total



                                             31 Desember 2024/December 31, 2024
                                           Properti/     Kendaraan/         Total/
                                          Properties      Vehicles         Total/

    Saldo awal                                686.605             649.648          1.336.253    Beginning balance
    Penambahan                                      -              (1.192)            (1.192)   Addition
    Penambahan bunga                           23.664              26.023             49.687    Accretion of interest
    Pembayaran                               (877.790)           (225.629)        (1.103.419)   Payment
    Selisih kurs                              286.468                (940)           285.528    Foreign exchange

    Jumlah                                    118.947             447.910           566.857     Total

    Utang sewa jangka panjang yang
      akan jatuh tempo dalam waktu                                                              Current portion of lease
      satu tahun                               12.172             228.084           240.256       liabilities
    Utang sewa jangka panjang - setelah
      dikurangi bagian yang akan
      jatuh tempo dalam waktu                                                                   Long-term lease liabilities -
      satu tahun                              106.775             219.826           326.601       net of current portion

    Jumlah                                    118.947             447.910           566.857     Total




                                                            - 76 -
Page 83
PT GOLDEN ENERGY MINES Tbk                                                                     PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                          Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                     As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                              and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                         March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                               (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                               unless Otherwise Stated)


18. Pengukuran Nilai Wajar                                                 18. Fair Value Measurement

   Instrumen keuangan yang disajikan di dalam                                 Financial instruments presented in the consolidated
   laporan posisi keuangan konsolidasian dicatat                              statement of financial position are reasonable
   mendekati nilai wajarnya atau karena nilai wajarnya                        approximation of fair values or their fair values
   tidak dapat diukur secara handal. Penjelasan lebih                         cannot be reliably measured. Further explanations
   lanjut diberikan pada paragraf-paragraf berikut.                           are provided in the following paragraphs.

   Instrumen keuangan dengan nilai tercatat yang                              Financial instruments with carrying amounts
   mendekati nilai wajarnya                                                   that approximate their fair values

   Manajemen menetapkan bahwa nilai tercatat                                  Management has determined that the carrying
   (berdasarkan jumlah nosional) kas dan setara kas,                          amounts (based on notional amounts) of cash and
   piutang usaha dan piutang lain-lain, utang usaha                           cash equivalents, trade and other receivables, trade
   dan utang lain-lain, utang bank jangka pendek dan                          and other payables, short-term bank loans and
   beban akrual mendekati sebesar nilai wajarnya                              accrued expenses reasonably approximate their fair
   karena instrumen keuangan tersebut sebagian                                values because they are mostly short-term in
   besar berjangka pendek.                                                    nature.

   Nilai tercatat dana yang dibatasi pencairannya telah                       The fair value of restricted funds approximates the
   mendekati estimasi nilai wajarnya.                                         estimated fair market values.

   Nilai tercatat dari utang sewa dan utang bank jangka                       The carrying values of lease liabilities and long-term
   panjang mendekati nilai wajarnya disebabkan oleh                           bank loan approximate their fair values due to the
   pemakaian suku bunga mengambang atas                                       floating rate interests on these instruments which
   instrumen tersebut, dimana tingkat bunga tersebut                          are subject to adjustments by the creditors.
   selalu disesuaikan oleh kreditur.

   Tabel berikut menyajikan nilai tercatat dan estimasi                       The following table sets forth the carrying values
   nilai wajar atas aset dan liabilitas keuangan Grup:                        and estimated fair values of the Group’s financial
                                                                              assets and liabilities:

                                             31 Maret/March 31 ,
                                                      2025                     31 Desember/December 31 ,
                                          (Tidak Diaudit/Unaudited )                       2024
                                                             Estimasi                            Estimasi
                                                            Nilai Wajar/                        Nilai Wajar/
                                      Nilai Tercatat/       Estimated        Nilai Tercatat/    Estimated
                                      Carrying Value        Fair Value       Carrying Value     Fair Value

    Aset Keuangan                                                                                              Financial Assets
    Kas dan setara kas                   335.305.520        335.305.520       326.929.041       326.929.041    Cash and cash equivalents
    Piutang usaha                        220.919.985        220.919.985       202.692.042       202.692.042    Trade receivables
    Piutang lain-lain                        654.572            654.572           671.459           671.459    Other receivables
    Dana yang dibatasi pencairannya       31.116.977         31.116.977        24.660.166        24.660.166    Restricted funds
    Aset tidak lancar lainnya             10.747.719         10.747.719         9.721.308         9.721.308    Other non-current assets

    Jumlah Aset Keuangan                 598.744.773        598.744.773       564.674.016       564.674.016    Total Financial Assets

    Liabilitas Keuangan                                                                                        Financial Liabilities
    Utang bank                           172.516.748        172.516.748       282.060.169       282.060.169    Bank loans
    Utang usaha                          277.008.165        277.008.165       247.993.628       247.993.628    Trade payables
    Utang lain-lain                          171.087            171.087           389.496           389.496    Other payables
    Beban akrual                          19.251.476         19.251.476        16.345.798        16.345.798    Accrued expenses
    Utang sewa                               527.985            527.985           566.857           566.857    Lease liabilities

    Jumlah Liabilitas Keuangan           469.475.461        469.475.461       547.355.948       547.355.948    Total Financial Liabilities




                                                                 - 77 -
Page 84
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


   Hierarki Nilai Wajar                                             Fair Value Hierarchy

   Aset dan liabilitas keuangan diklasifikasikan secara             Financial assets and liabilities are classified in their
   keseluruhan berdasarkan tingkat terendah dari                    entirely based on the lowest level of input that is
   masukan (input) yang signifikan terhadap                         significant to the fair value measurements. The
   pengukuran nilai wajar. Penilaian dampak signifikan              assessment of the significance of a particular input
   dari suatu input tertentu terhadap pengukuran nilai              to the fair value measurements requires judgement,
   wajar membutuhkan pertimbangan dan dapat                         and may affect the valuation of the assets and
   memengaruhi penilaian dari aset dan liabilitas yang              liabilities being measured and their placement
   diukur dan penempatannya dalam hierarki nilai                    within the fair value hierarchy.
   wajar.

   Bukti terbaik dari nilai wajar adalah harga yang                 The best evidence of fair value is quoted prices in
   dikuotasikan (quoted prices) dalam sebuah pasar                  an active market. If the market for a financial
   yang aktif. Jika pasar untuk sebuah instrumen                    instrument is not active, an entity establishes fair
   keuangan tidak aktif, entitas menetapkan nilai wajar             value by using a valuation technique. The objective
   dengan menggunakan metode penilaian. Tujuan                      of using a valuation technique is to establish what
   dari penggunaan metode penilaian adalah untuk                    the transaction price would have been on the
   menetapkan harga transaksi yang terbentuk pada                   measurement date in an arm’s length exchange
   tanggal pengukuran dalam sebuah transaksi                        motivated by normal business considerations.
   pertukaran yang wajar dengan pertimbangan bisnis
   normal.

   Metode penilaian termasuk penggunaan harga                       Valuation techniques include using recent arm’s
   dalam transaksi pasar yang wajar (arm’s length)                  length      market     transactions    between
   terakhir antara pihak-pihak yang memahami dan                    knowledgeable, willing parties, if available,
   berkeinginan, jika tersedia, referensi kepada nilai              reference to the current fair value of another
   wajar terkini dari instrumen lain yang secara                    instrument that is substantially the same,
   substansial sama, analisa arus kas yang                          discounted cash flow analysis.
   didiskontokan.

   Jika terdapat metode penilaian yang biasa                        If there is a valuation technique commonly used by
   digunakan oleh para peserta pasar untuk                          market participants to price the instrument and that
   menentukan harga dari instrumen dan metode                       technique has been demonstrated to provide
   tersebut telah didemonstrasikan untuk menyediakan                reliable estimates of prices obtained in actual
   estimasi yang andal atas harga yang diperoleh dari               market transactions, the entity uses that technique.
   transaksi pasar yang aktual, entitas harus                       The chosen valuation technique makes maximum
   menggunakan metode tersebut. Metode penilaian                    use of market inputs and relies as little as possible
   yang dipilih membuat penggunaan maksimum dari                    on entity-specific inputs. It incorporates all factors
   input pasar dan bergantung sedikit mungkin atas                  that market participants would consider in setting a
   input yang spesifik untuk entitas (entity-specific               price and is consistent with accepted economic
   input). Metode tersebut memperhitungkan semua                    methodologies for pricing financial instruments.
   faktor yang akan dipertimbangkan oleh peserta                    Periodically, the Group calibrates the valuation
   pasar dalam menentukan sebuah harga dan selaras                  technique and tests it for validity using prices from
   dengan metode ekonomis untuk penilaian sebuah                    any observable current market transactions in the
   instrumen keuangan. Secara berkala, Grup                         same instrument (i.e., without modification or
   menelaah metode penilaian dan mengujinya untuk                   repackaging) or based on any available observable
   validitas dengan menggunakan harga dari transaksi                market data.
   pasar terkini yang dapat diobservasi untuk
   instrumen yang sama (yaitu tanpa modifikasi dan
   pengemasan kembali) atau berdasarkan data pasar
   yang tersedia dan dapat diobservasi.

   Pada tanggal 31 Maret 2025 dan 31 Desember                       As of March 31, 2025 and December 31, 2024, the
   2024, Grup tidak memiliki aset keuangan dan                      Group has no financial assets and financial liabilities
   liabilitas keuangan yang diukur menggunakan nilai                that are measured at fair value.
   wajarnya.




                                                          - 78 -
Page 85
PT GOLDEN ENERGY MINES Tbk                                                                PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                     Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                         and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                    March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                          (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                          unless Otherwise Stated)


19. Provisi Reklamasi dan Penutupan Tambang                           19. Provision for Reclamation and Mine Closure

   Mutasi penyisihan untuk provisi reklamasi dan                             The movements in the provision for reclamation and
   penutupan tambang adalah sebagai berikut:                                 mine closure are as follows:

                                                     31 Maret/
                                                    March 31 ,
                                                       2025             31 Desember/
                                                  (Tidak Diaudit/       December 31 ,
                                                    Unaudited )             2024

    Saldo awal                                         6.530.229               6.160.725    Beginning balance
    Penambahan (Catatan 30)                               99.357                 383.133    Addition (Note 30)
    Selisih kurs                                          (7.722)                (13.629)   Foreign exchange

    Jumlah                                             6.621.864               6.530.229    Total

   Provisi reklamasi dan penutupan tambang                                   Provision for reclamation and mine closure
   merupakan provisi yang dibuat oleh Grup                                   represents    the     provision     set    up    by
   untuk        memenuhi      Peraturan       Menteri                        the Group to comply with the Minister
   Lingkungan        Hidup       dan       Kehutanan                         Regulation   of   Environment        and    Forestry
   No. P/89/MENLHK/SETJEN/KUM.1/11/2016 dan                                  No. P/89/MENLHK/SETJEN/KUM.1/11/2016 and
   PP No. 78 untuk rehabilitasi daerah aliran sungai,                        GR No. 78 for rehabilitation of the watershed area,
   aktivitas reklamasi dan pasca tambang atas usaha                          reclamation and post-mining activities for coal
   penambangan batubara.                                                     mining business.

   Manajemen yakin bahwa akumulasi provisi telah                             Management believes that the current accumulated
   cukup untuk menyelesaikan semua liabilitas yang                           provision is sufficient to cover all liabilities related to
   berhubungan dengan kewajiban pengelolaan dan                              the environmental and reclamation costs and mine
   reklamasi lingkungan hidup dan penutupan                                  closure arising from mining activities up to the end
   tambang yang timbul dari kegiatan tambang sampai                          of a mine’s life.
   dengan akhir umur tambang.


20. Modal Saham                                                       20. Capital Stock

   Susunan kepemilikan saham Perusahaan pada                                 As of March 31, 2025 and December 31, 2024, the
   tanggal 31 Maret 2025 dan 31 Desember 2024,                               share ownership in the Company, based on the
   berdasarkan catatan yang dibuat oleh PT Sinartama                         record of PT Sinartama Gunita, share’s registrar,
   Gunita, Biro Administrasi Efek, adalah sebagai                            follows:
   berikut:

                                       Jumlah             Persentase                Jumlah
                                       Saham/            Kepemilikan/            Modal Disetor/
                                      Number of          Percentage of           Total Paid-up
        Nama Pemegang Saham            Shares             Ownership              Capital Stock              Name of Stockholders
                                                              %
    PT Dian Swastatika Sentosa Tbk   3.000.000.100              51,000              33.183.640      PT Dian Swastatika Sentosa Tbk
    PT Radhika Jananta Raya          1.764.705.900              30,000              19.519.788      PT Radhika Jananta Raya
    Golden Energy and Resources,                                                                    Golden Energy and Resources
      Pte., Ltd., Singapura           411.192.353                    6,990           4.548.306        Pte., Ltd., Singapore
    PT Sinar Mas Cakrawala             95.505.000                    1,624           1.056.411      PT Sinar Mas Cakrawala
    Publik                            610.949.647                   10,386           6.757.816      Public

    Total                            5.882.353.000              100,000             65.065.961      Total


   Manajemen Permodalan                                                      Capital Management

   Tujuan utama dari pengelolaan modal Grup adalah                           The primary objective of the Group’s capital
   untuk memastikan bahwa Grup mempertahankan                                management is to ensure that it maintains healthy
   rasio modal yang sehat dalam rangka mendukung                             capital ratios in order to support its business and
   bisnis dan memaksimalkan nilai pemegang saham.                            maximize shareholder value.


                                                             - 79 -
Page 86
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


   Grup mengelola permodalan untuk menjaga                             The Group manages its capital to safeguard the
   kelangsungan     usahanya       dalam     rangka                    Group’s ability to continue as a going concern in
   memaksimumkan kekayaan para pemegang saham                          order to maximize the return to shareholders and
   dan manfaat kepada pihak lain yang berkepentingan                   benefits for other stakeholders, and to maintain
   terhadap Grup dan untuk menjaga struktur optimal                    optimal capital structure to reduce the cost of
   permodalan untuk mengurangi biaya permodalan.                       capital.

   Struktur permodalan Grup terdiri dari ekuitas dan                   The capital structure of the Group consists of total
   pinjaman serta utang (terdiri dari utang bank dan                   equity and loans and payables (consists of short-
   lembaga keuangan jangka pendek dan jangka                           term bank loans and long-term loans to banks and
   panjang dan utang jangka panjang lainnya dikurangi                  financial institution and other long-term payables
   dengan saldo kas dan setara kas).                                   net of cash and cash equivalents).


21. Tambahan Modal Disetor - Bersih                                21. Additional Paid-in Capital - Net

   Akun ini merupakan tambahan modal disetor                           This account represents additional paid-in capital in
   sehubungan dengan:                                                  connection with the following:

                                                   31 Maret 2025/
                                                   March 31, 2025
                                                   (Tidak Diaudit/
                                                     Unaudited )
                                                      dan/and
                                                 31 Desember 2024/
                                                 December 31, 2024

    Tambahan modal disetor dari penerbitan                                      Additional paid-in capital from
      modal saham                                          235.163.487             capital stock issuance
    Biaya emisi saham                                       (5.815.660)         Share issuance costs
                                                                                Difference in value of transactions
    Selisih nilai transaksi entitas                                                among entities under common
      sepengendali                                             (328.629)           control

    Jumlah                                                 229.019.198          Total

   Rincian selisih nilai transaksi entitas sepengendali                The details of difference in value of transactions
   adalah sebagai berikut:                                             among entities under common control are as
                                                                       follows:

                                                   31 Maret 2025/
                                                   March 31, 2025
                                                   (Tidak Diaudit/
                                                     Unaudited )
                                                      dan/and
                                                 31 Desember 2024/
                                                 December 31, 2024

    Entitas Anak                                                              Subsidiaries
      PT Wahana Alam Lestari (WAL)                              567.513         PT Wahana Alam Lestari (WAL)
      PT Nusantara Indah Lestari (NIL)                           17.297         PT Nusantara Indah Lestari (NIL)
      PT Citra Alam Indah (CAI)                                (124.658)        PT Citra Alam Indah (CAI)
      PT Manggala Alam Lestari (MAL)                           (788.781)        PT Manggala Alam Lestari (MAL)
    Jumlah                                                     (328.629)        Total




                                                          - 80 -
Page 87
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


22. Cadangan Umum dan Dividen Tunai                               22. General Reserve and Cash Dividends

   2024                                                              2024

   Berdasarkan Pernyataan Keputusan Sirkular Direksi                 Based on the Circular Statement of the Company’s
   Perusahaan, seluruh anggota Direksi Perusahaan                    Board of Directors, all members of the Company’s
   dengan persetujuan Dewan Komisaris Perusahaan                     Board of Directors with approval of the Company’s
   pada tanggal 26 November 2024 memutuskan                          Board of Commissioners on November 26, 2024
   membagikan dividen interim ke-3 untuk tahun buku                  decided to distribute third interim dividend for the
   2024 sebesar US$ 90.000.000 atau US$ 0,0153 per                   year 2024 amounting to US$ 90,000,000 or
   saham kepada para pemegang saham.                                 US$ 0.0153 per share to shareholders.

   Berdasarkan Pernyataan Keputusan Sirkular Direksi                 Based on the Circular Statement of the Company’s
   Perusahaan, seluruh anggota Direksi Perusahaan                    Board of Directors, all members of the Company’s
   dengan persetujuan Dewan Komisaris Perusahaan                     Board of Directors with approval of the Company’s
   pada tanggal 23 Agustus 2024 memutuskan                           Board of Commissioners on August 23, 2024
   membagikan dividen interim ke-2 untuk tahun buku                  decided to distribute second interim dividend for the
   2024 sebesar US$ 150.000.000 atau US$ 0,0255                      year 2024 amounting to US$ 150,000,000 or
   per saham kepada para pemegang saham.                             US$ 0.0255 per share to shareholders.

   Berdasarkan Pernyataan Keputusan Sirkular Direksi                 Based on the Circular Statement of the Company’s
   Perusahaan, seluruh anggota Direksi Perusahaan                    Board of Directors, all members of the Company’s
   dengan persetujuan Dewan Komisaris Perusahaan                     Board of Directors with approval of the Company’s
   pada tanggal 29 Mei 2024 memutuskan                               Board of Commissioners on May 29, 2024 decided
   membagikan dividen interim untuk tahun buku 2024                  to distribute interim dividend for the year 2024
   sebesar US$ 150.000.000 atau US$ 0,0255 per                       amounting to US$ 150,000,000 or US$ 0.0255 per
   saham kepada para pemegang saham.                                 share to shareholders.

   Berdasarkan Akta Berita Acara Rapat Umum                          Based on Memorandum of Annual Stockholders’
   Pemegang Saham Tahunan No. 128 tanggal                            Meeting No. 128 dated May 16, 2024, all of the
   16 Mei 2024, para pemegang saham Perusahaan                       Company’s shareholders agreed to:
   menyetujui:

   •   Membentuk    dana     cadangan     sebesar                    •   Establish a reserve fund amounting             to
       US$ 1.000.000 dari laba bersih tahun buku                         US$ 1,000,000 from 2023 net income.
       2023.

   •   Dividen sebesar US$ 500.000.000 sebagai                       •   Dividend amounting to US$ 500,000,000 as a
       dividen final tahun buku 2023 dimana sebagian                     final dividend for the year 2023 of which
       dari jumlah dividen yaitu masing-masing                           US$ 325,000,000 and US$ 90,000,000 had
       sebesar         US$      325.000.000        dan                   been distributed as dividends interim 1 and 2,
       US$ 90.000.000 telah dibagikan sebagai                            also had been paid to shareholders on
       dividen interim 1 dan 2, serta telah dibayarkan                   September 12, 2023 and December 22, 2023,
       kepada seluruh pemegang saham pada tanggal                        respectively.
       12 September 2023 dan 22 Desember 2023.




                                                         - 81 -
Page 88
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


23. Selisih Transaksi Dengan Pihak Nonpengendali                  23. Difference Arising from Transaction with Non-
                                                                      controlling Interests

   Rincian  selisih    transaksi   dengan       pihak                The details of difference arising from transactions
   nonpengendali adalah sebagai berikut:                             with non-controlling interests are as follows:

                                                  31 Maret 2025/
                                                  March 31, 2025
                                                  (Tidak Diaudit/
                                                    Unaudited )
                                                     dan/and
                                                31 Desember 2024/
                                                December 31, 2024

    Entitas Anak                                                           Subsidiaries
      RCI                                                   1.339.815        RCI
      KMS                                                      44.876        KMS
      KIM                                                    (155.737)       KIM

    Jumlah                                                  1.228.954         Total

   RCI                                                               RCI

   Berdasarkan Akta No. 47 tanggal 23 Februari 2009                  Based on Deed No. 47 dated February 23, 2009 of
   dari Linda Herawati, S.H., notaris di Jakarta, para               Linda Herawati, S.H., a public notary in Jakarta, the
   pemegang saham RCI menyetujui peningkatan                         shareholders of RCI agreed to increase its
   modal     ditempatkan   dan      disetor   sebesar                authorized     and       paid-up      capital      by
   Rp 12.530.000.000 (setara US$ 1.158.255) yang                     Rp 12,530,000,000 (equivalent to US$ 1,158,255)
   diambil bagian seluruhnya oleh Perusahaan,                        which were all acquired by the Company,
   sehingga kepemilikan Perusahaan meningkat dari                    accordingly, the Company’s ownership interest
   50,000% menjadi 57,365%.                                          increased from 50.000% to 57.365%.

   Terdapat selisih lebih antara nilai setoran modal                 The excess of the amount paid over the book, value
   dengan nilai buku RCI pada tanggal akuisisi sebesar               of the assets of RCI at transaction date amounted
   Rp 1.808.196.657 (setara US$ 121.095).                            to Rp 1,808,196,657 (equivalent to US$ 121,095).

   Berdasarkan Akta No. 58 tanggal 20 Juli 2010 dari                 Based on Deed No. 58 dated July 20, 2010 of
   Hannywati Gunawan, S.H., notaris di Jakarta, para                 Hannywati Gunawan, S.H., a public notary in
   pemegang        saham       RCI       menyetujui                  Jakarta, the shareholders of RCI agreed to increase
   peningkatan modal dasar serta modal ditempatkan                   its authorized capital and its issued and paid-up
   dan disetor sebesar Rp 100.000.000.000                            capital by Rp 100,000,000,000 (equivalent to
   (setara US$ 11.052.166) yang diambil bagian                       US$ 11,052,166), which were all acquired by the
   seluruhnya oleh Perusahaan, sehingga kepemilikan                  Company, accordingly, the Company’s ownership
   Perusahaan meningkat dari 57,365% menjadi                         interest increased from 57.365% to 80.403%.
   80,403%.

   Terdapat selisih lebih antara nilai setoran modal                 The difference between the value of paid-in capital
   dengan nilai buku RCI pada tanggal akuisisi sebesar               and the book value RCI on the acquisition date
   Rp 10.735.214.931 (setara US$ 1.284.173).                         amounted to Rp 10,735,214,931 (equivalent to
                                                                     US$ 1,284,173).




                                                         - 82 -
Page 89
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


   Berdasarkan Akta No. 59 tanggal 15 April 2011 dari                Based on Deed No. 59 dated April 15, 2011 of Deni
   Deni Thanur, S.E., S.H., M.Kn., notaris di Jakarta,               Thanur, S.E., S.H., M.Kn., a public notary in Jakarta,
   para pemegang saham RCI menyetujui antara lain                    the shareholders of RCI agreed, among others, to
   perubahan klasifikasi saham RCI menjadi saham                     change the clalssification of RCI’s shares into
   Seri A bernilai nominal Rp 1.000.000 dan saham                    Series A shares with nominal value per share of
   Seri B bernilai nominal Rp 1.000 dan perubahan                    Rp 1,000,000 and Series B shares with nominal
   seluruh saham yang telah dikeluarkan menjadi                      value per share of Rp 1,000 and to change all of the
   saham Seri A serta peningkatan modal ditempatkan                  issued shares to Series A shares and increase the
   dan disetor sebesar Rp 3.500.000.000 (setara                      issued and paid-up capital by Rp 3,500,000,000
   US$ 404.344) atas 3.500.000 saham Seri B, yang                    (equivalent to US$ 404,344) consisting of 3,500,000
   diambil seluruhnya oleh Perusahaan, sehingga                      Series B shares which were all acquired by the
   kepemilikan Perusahaan meningkat dari 80,403%                     Company, accordingly, the Company’s ownership
   menjadi 99,016%.                                                  interest increased from 80.403% to 99.016%.

   Terdapat selisih lebih antara setoran modal                       The excess of the amount paid by the Company
   Perusahaan dengan nilai buku RCI pada tanggal                     over the book value of the assets of RCI at
   akuisisi sebesar Rp 26.151.860.412 (setara                        transaction date amounted to Rp 26,151,860,412
   US$ 2.745.083).                                                   (equivalent to US$ 2,745,083).

   KMS                                                               KMS

   Berdasarkan Akta Jual Beli dan Penyerahan serta                   Based on the Sale and Purchase and Shares
   Pemindahan Hak atas Saham No. 26 tanggal                          Transfer Deeds No. 26 dated May 16, 2014
   16 Mei 2014 dari Deni Thanur, S.E., S.H., M.Kn.,                  of Deni Thanur, S.E., S.H., M.Kn., a public notary
   notaris di Jakarta, Perusahaan menjual dan                        in Jakarta, the Company sold and transferred
   menyerahkan serta memindahkan hak atas 1.990                      1,990 shares in KMS to CAJ, a third party, at a
   saham yang dimilikinya dalam KMS kepada CAJ,                      selling price of Rp 1,990,000,000 (equivalent to
   pihak    ketiga,  seharga    Rp   1.990.000.000                   US$ 193,863).
   (setara US$ 193.863).

   Terdapat selisih antara harga pelepasan dengan                    The difference between the selling price and
   nilai buku investasi sebesar Rp 13.264.765 (setara                carrying value of investment amounted to
   US$ 31.701).                                                      Rp 13,264,765 (equivalent to US$ 31,701).

   Berdasarkan Akta Jual Beli dan Penyerahan serta                   Based on Sale and Purchase and Shares Transfer
   Pemindahan Hak Atas Saham No. 27 tanggal                          Deeds No. 27 dated May 16, 2014 of Deni
   16 Mei 2014 dari Dani Thanur, S.E., S.H., M.Kn.,                  Thanur, S.E., S.H., M.Kn., a public notary in Jakarta,
   notaris di Jakarta, KIM menjual dan menyerahkan                   KIM sold and transferred 10 shares in KMS to CAJ,
   serta memindahkan hak atas 10 saham yang                          a   third   party, at      a selling       price of
   dimilikinya dalam KMS kepada CAJ, pihak ketiga,                   Rp 10,000,000 (equivalent to US$ 974).
   seharga Rp 10.000.000 (setara US$ 974).

   Berdasakan Akta Juali Beli dan Penyerahan serta                   Based on Sale and Purchase and Shares Transfer
   Pemindahan Hak atas Saham No. 09 tanggal                          Deeds No. 09 dated September 10, 2015 of Deni
   10 September 2015 dari Deni Thanur, S.E., S.H.,                   Thanur, S.E., S.H., M.Kn., a public notary in Jakarta,
   M.Kn., notaris di Jakarta, CAJ, pihak ketiga, menjual             CAJ, a third party, sold and transferred
   dan menyerahkan serta memindahkan hak atas 10                     10 shares in KMS to RCI at a selling price
   saham yang dimilikinya dalam KMS kepada RCI                       Rp 10,000,000 (equivalent to US$ 974).
   seharga Rp 10.000.000 (setara US$ 974).




                                                           - 83 -
Page 90
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


   KIM                                                               KIM

   Berdasarkan Akta No. 31 tanggal 20 November                       Based on Deed No. 31 dated November 20, 2015 of
   2015 dari Deni Thanur, S.E., S.H., M.Kn., notaris                 Deni Thanur, S.E., S.H., M.Kn., a public notary in
   di Jakarta, para pemegang saham KIM menyetujui                    Jakarta, the shareholders of KIM agreed to increase
   peningkatan modal dasar dari Rp 200.000.000.000                   its         authorized         capital         from
   menjadi Rp 1.000.000.000.000 serta modal                          Rp 200,000,000,000 to Rp 1,000,000,000,000 and
   ditempatkan      dan    disetor    dari  sebesar                  its   issued     and     paid-up    capital    from
   Rp       50.000.000.000       menjadi    sebesar                  Rp 50,000,000,000 to Rp 550,000,000,000 or an
   Rp 550.000.000.000 atau meningkat sebesar                         increase of Rp 500,000,000,000 by issuing 150,000
   Rp 500.000.000.000 dengan pengeluaran 150.000                     shares in deposit and 350,000 new shares which
   saham dalam simpanan dan penerbitan 350.000                       were all acquired by the Company.
   saham baru yang diambil bagian seluruhnya oleh
   Perusahaan.

   Terdapat selisih antara nilai setoran modal dengan                The difference between the amount paid with
   nilai buku investasi KIM sebesar US$ 155.737.                     carrying value of investment of KIM amounting to
   Setelah peningkatan modal tersebut, kepemilikan                   US$ 155,737. Accordingly, the Compay’s ownership
   Perusahaan meningkat dari 99,9980% menjadi                        interest increased from 99.9980% to 99.9998%.
   99,9998%.

   Berdasarkan Akta No. 21 tanggal 5 September 2016                  Based on Deed No. 21 dated September 5, 2016 of
   dari Deni Thanur, S.E., S.H., M.Kn., notaris di                   Deni Thanur, S.E., S.H., M.Kn., a public notary in
   Jakarta, yang antara lain, para pemegang saham                    Jakarta, among others, the shareholders of KIM
   KIM menyetujui peningkatan modal ditempatkan                      agreed to increase its issued and paid-up capital
   dan disetor dari sebesar Rp 550.000.000.000                       from Rp 550,000,000,000 to Rp 595,000,000,000 or
   menjadi sebesar Rp 595.000.000.000 atau                           an increase of Rp 45,000,000,000 by issuing 45,000
   meningkat sebesar Rp 45.000.000.000 dengan                        shares in deposit which were all acquired by the
   pengeluaran 45.000 saham dalam simpanan yang                      Company.
   diambil bagian seluruhnya oleh Perusahaan.

   Terdapat selisih antara nilai setoran modal dengan                The difference between the amount paid with the
   nilai buku investasi KIM sebesar US$ 13.                          carrying value of investment of KIM amounted to
                                                                     US$ 13.


24. Kepentingan Nonpengendali                                    24. Non-controlling Interests

   a.    Kepentingan nonpengendali atas aset bersih                  a.    Non-controlling interests in net assets of
         entitas anak:                                                     subsidiaries

                                                31 Maret/
                                               March 31 ,
                                                  2025            31 Desember/
                                             (Tidak Diaudit/      December 31 ,
                                               Unaudited )            2024

         TKS                                              -              52.621    TKS
         GEI                                              -              (1.257)   GEI
         BAS                                              -              (1.722)   BAS
         KIM                                        119.323             (71.046)   KIM
         RCI                                     (3.553.546)         (2.436.085)   RCI
         BORNEO                                  (3.857.446)         (2.787.928)   BORNEO
         DSU                                     (2.716.077)         (3.723.458)   DSU

         Jumlah                                 (10.007.746)         (8.968.875)   Total




                                                        - 84 -
Page 91
PT GOLDEN ENERGY MINES Tbk                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                  unless Otherwise Stated)


   b.   Kepentingan nonpengendali pada laba (rugi)               b.   Non-controlling interests in profit (loss) of
        entitas anak                                                  subsidiaries

                                              Tiga bulan/Three months
                                                 31 Maret/March 31 ,
                                              (Tidak Diaudit/Unaudited )
                                              2025                2024

        RCI                                    1.121.810           1.716.570    RCI
        BORNEO                                 1.069.520           1.641.467    BORNEO
        TKS                                       52.628             (52.628)   TKS
        KIM                                         (106)               (331)   KIM
        GEI                                       (1.257)                  -    GEI
        BAS                                       (1.722)                  -    BAS
        DSU                                   (1.015.965)            109.988    DSU

        Jumlah                                1.224.908            3.415.066    Total



25. Pendapatan Usaha                                          25. Revenues

   a.   Berdasarkan Area Penjualan                               a.   Based on Sales Area

                                             Tiga bulan/Three months
                                                31 Maret/March 31 ,
                                             (Tidak Diaudit/Unaudited )
                                             2025                2024

        Penjualan luar negeri               401.168.085         509.611.998     Export sales
        Penjualan dalam negeri              247.171.054         206.029.072     Domestic sales

        Jumlah                              648.339.139         715.641.070     Total



   b.   Berdasarkan Pelanggan                                    b.   Based on Customers

                                             Tiga bulan/Three months
                                                31 Maret/March 31 ,
                                             (Tidak Diaudit/Unaudited )
                                             2025                 2024

        Pihak ketiga                        603.543.239         656.294.959     Third parties
        Pihak berelasi (Catatan 35)          44.795.900          59.346.111     Related parties (Note 35)

        Jumlah                              648.339.139         715.641.070     Total

   c.   Berdasarkan Mata Uang                                    c.   Based on Currency

                                             Tiga bulan/Three months
                                                31 Maret/March 31 ,
                                             (Tidak Diaudit/Unaudited )
                                             2025                 2024

        Dolar Amerika Serikat               401.168.085         509.611.998     United States Dollar
        Rupiah                              247.171.054         206.029.072     Rupiah

        Jumlah                              648.339.139         715.641.070     Total




                                                     - 85 -
Page 92
PT GOLDEN ENERGY MINES Tbk                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                     unless Otherwise Stated)


   Penjualan kepada pihak berelasi untuk periode tiga                Sales to related parties for the three-month period
   bulan yang berakhir pada 31 Maret 2025 dan 2024                   ended March 31, 2025 and 2024 represent 6.91%
   masing-masing sebesar 6,91% dan 8,29% dari total                  and 8.29%, respectively, of total sales for the
   penjualan pada periode yang bersangkutan                          respective period (Note 35). Management believes
   (Catatan 35). Manajemen berpendapat tidak                         that there is no concentration of sales to related
   terdapat ketergantungan penjualan kepada pihak                    parties.
   berelasi.


26. Beban Pokok Penjualan                                        26. Cost of Revenues

                                               Tiga bulan/Three months
                                                  31 Maret/March 31 ,
                                               (Tidak Diaudit/Unaudited )
                                               2025                2024

    Beban produksi                                                                 Production costs
      Jasa penambangan (Catatan 35)           232.875.903          185.406.347       Mining services (Note 35)
      Royalti (Catatan 37)                     83.232.983           89.406.314       Royalty (Note 37)
      Pengangkutan batubara                    44.845.391           41.368.142       Coal hauling
      Overhead pertambangan (Catatan 35)       38.933.711           37.212.897       Mining overhead (Note 35)
      Amortisasi aset pertambangan
        atas tambang pada tahap                                                      Amortization of mine properties
        produksi (Catatan 11)                   3.576.029            4.829.906         for producing mines (Note 11)
      Penggarapan lahan (Catatan 37)            3.021.631            2.836.951       Land exploitation (Note 37)
      Sewa peralatan (Catatan 35)                 727.528            1.145.490       Equipment rental (Note 35)
                                                                                     Depreciation of property and
      Penyusutan aset tetap (Catatan 9)          486.699               519.302         equipment (Note 9)
      Amortisasi aset pertambangan
        atas aset aktivitas pengupasan                                               Amortization of mine properties
        lapisan tanah (Catatan 11)                87.469               102.162         for stripping activity asset (Note 11)
      Amortisasi aset takberwujud -                                                  Amortization of intangible asset -
        piranti lunak (Catatan 12)                  6.743                1.638         software (Note 12)
    Jumlah beban produksi                     407.794.087          362.829.149     Total production costs

    Persediaan batubara                                                            Coal inventory
      Saldo awal                               22.682.648            40.074.914      Beginning balance
      Pembelian                                 4.197.059            10.690.614      Purchases
      Saldo akhir                             (35.824.646)          (35.300.782)     Ending balance
    Kenaikan (penurunan) bersih                (8.944.939)          15.464.746     Net increase (decrease)

    Jumlah                                    398.849.148          378.293.895     Total

   Beban pokok penjualan kepada pihak berelasi untuk                 Cost of revenues to related parties for the
   periode tiga bulan yang berakhir pada 31 Maret                    three-month period ended March 31, 2025 and
   2025 dan 2024 masing-masing sebesar 20,30% dan                    2024 represent 20.30% and 16.55%, respectively,
   16,55% dari total beban pokok penjualan pada                      of the total cost of revenues for the respective period
   periode yang bersangkutan (Catatan 35).                           (Note 35).

   Tidak ada pembelian dari pemasok dengan total                     There were no purchases from any supplier which
   akumulasi yang melebihi 10% dari total penjualan                  exceeded 10% of total sales for three-month
   selama periode tiga bulan yang berakhir pada                      periods ended March 31, 2025 and 2024.
   tanggal 31 Maret 2025 dan 2024.




                                                        - 86 -
Page 93
PT GOLDEN ENERGY MINES Tbk                                                          PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                              AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim               Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                          As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                   and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                              March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                    (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                    unless Otherwise Stated)


27. Beban Penjualan                                             27. Selling Expenses

                                                Tiga bulan/Three months
                                                   31 Maret/March 31 ,
                                                (Tidak Diaudit/Unaudited )
                                                2025                2024

    Ongkos angkut                               52.747.707         61.632.745    Freight
    Jasa stockpile (Catatan 35)                 10.421.359         11.209.266    Stockpile services (Note 35)
    Asuransi pengapalan                          4.319.674          4.859.592    Freight insurance
    Analisa dan survei                           1.085.293          1.075.797    Survey and analysis
                                                                                 Depreciation of property and
    Penyusutan aset tetap (Catatan 9)             876.650             833.091      equipment (Note 9)
    Perbaikan dan pemeliharaan (Catatan 35)       234.000             234.000    Repairs and maintenance (Note 35)
    Lain-lain                                      74.127             155.519    Others

    Jumlah                                      69.758.810         80.000.010    Total



28. Beban Umum dan Administrasi                                 28. General and Administrative Expenses

                                                Tiga bulan/Three months
                                                   31 Maret/March 31 ,
                                                (Tidak Diaudit/Unaudited )
                                                2025                2024

    Gaji dan tunjangan                           9.656.086           9.729.179   Salaries and benefits
    Pajak                                        6.207.303           5.517.590   Taxes
    Asuransi (Catatan 35)                        5.258.009             422.000   Insurance (Note 35)
    Lisensi dan perijinan                        2.612.739           2.727.557   Licenses and permits
    Perbaikan dan pemeliharaan (Catatan 35)      2.592.362           2.343.932   Repairs and maintenance (Note 35)
    Jasa profesional                             2.176.446           2.838.351   Professional fees
                                                                                 Depreciation of property and
    Penyusutan aset tetap (Catatan 9)            1.364.302           2.477.527      equipment (Note 9)
    Corporate social responsibilities            1.198.111           1.884.508   Corporate social responsibilities
    Biaya operasional kantor                       802.860             660.500   Office expenses
    Depresiasi aset hak guna                                                     Depreciation of right-of-use assets
       (Catatan 17)                               625.164             284.002       (Note 17)
    Beban imbalan kerja karyawan (Catatan 31)     232.717             217.779    Employee benefits expense (Note 31)
    Perjalanan dinas                              165.309             156.952    Travel
    Pendidikan dan pelatihan                      102.769             209.146    Education and training
    Transportasi                                  102.627             119.242    Transportation
    Sewa gedung, kendaraan dan peralatan           16.437              20.379    Rental of building, vehicles and equipment
    Amortisasi aset tidak berwujud -                                             Amortization of intangible asset -
       piranti lunak (Catatan 12)                     144                5.611      software (Note 12)
    Lain-lain (masing-masing dibawah                                             Others (each below US$ 100,000)
       US$ 100.000) (Catatan 35 dan 37)          1.097.788           1.737.819      (Notes 35 and 37)

    Jumlah                                      34.211.173         31.352.074    Total




                                                       - 87 -
Page 94
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


29. Beban Keuangan Lainnya                                         29. Other Financial Charges

                                                 Tiga bulan/Three months
                                                    31 Maret/March 31 ,
                                                 (Tidak Diaudit/Unaudited )
                                                 2025                2024

    Beban keuangan                                1.148.000            1.325.780    Financial charges
    Biaya transaksi yang diamortisasi:                                              Amortization of transaction costs:
       Utang bank jangka panjang                            -              1.348       Long-term bank loans

    Jumlah                                        1.148.000            1.327.128    Total



30. Lain-lain - Bersih                                             30. Others - Net

                                                 Tiga bulan/Three months
                                                    31 Maret/March 31 ,
                                                 (Tidak Diaudit/Unaudited )
                                                 2025                2024

    Provisi reklamasi dan penutupan                                                 Provision for reclamation and
      tambang (Catatan 19)                          (99.357)             (95.747)     mine closure (Note 19)
    Amortisasi aset pertambangan                                                    Amortization of mine properties from
      dari kombinasi bisnis (Catatan 11)            (30.308)             (72.177)     business combination (Note 11)
    Lain-lain                                      (108.667)             213.336    Others

    Jumlah                                         (238.332)              45.412    Total



31. Imbalan Pasca-Kerja                                            31. Employee Benefits Liability

    Grup menyelenggarakan program pensiun manfaat                      The Group has a defined benefit pension plan for all
    pasti untuk semua karyawan yang memenuhi                           of its eligible permanent employees. The defined
    syarat. Program pensiun manfaat pasti entitas anak                 benefit pension plan of certain subsidiary is
    tertentu dikelola oleh Dana Pensiun Lembaga                        managed by Dana Pensiun Lembaga Keuangan
    Keuangan (DPLK) PT Asuransi Simas Jiwa, pihak                      (DPLK) PT Asuransi Simas Jiwa, related party.
    berelasi.

    Pada tanggal 31 Maret 2025 dan 31 Desember                         As of March 31, 2025 and December 31, 2024, the
    2024, pembayaran kontribusi Grup ke dana pensiun                   Group’s contributions to the pension fund amounted
    sebesar Rp 150.000.000 (setara US$ 9.216) dan                      to Rp 150,000,000 (equivalent to US$ 9,216) and
    Rp 1.404.454.000 (setara US$ 86.652).                              Rp 1,404,454,000 (equivalent to US$ 86,652),
                                                                       respectively.

    Pada tanggal 31 Maret 2025 dan 31 Desember                         As of March 31, 2025 and December 31, 2024, the
    2024, saldo liabilitas imbalan kerja karyawan                      balance of the related liability for employee benefits
    disajikan dalam laporan keuangan konsolidasian                     is presented in the interim consolidated statement
    interim sebagai akun “Liabilitas Imbalan Kerja” dan                of financial position as “Employee benefits liability”
    estimasi berdasarkan perhitungan aktuarial dengan                  account as estimated based on the actuarial
    menggunakan metode projected unit credit.                          calculations using the projected unit credit method.

    Perhitungan aktuarial pada tanggal 31 Desember                     The actuarial calculation as of December 31, 2024
    2024 ditentukan berdasarkan laporan penilaian dari                 were determined based on the valuation report from
    aktuaris independen, Kantor Konsultan Aktuaria                     the independent actuary firm, Kantor Konsultan
    Halim dan Rekan, yang dituangkan dalam                             Aktuaria Halim dan Rekan, as expressed in their
    laporannya tanggal 21 Februari 2025.                               report dated February 21, 2025.




                                                          - 88 -
Page 95
PT GOLDEN ENERGY MINES Tbk                                                                       PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                           AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                            Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                       As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                           March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                 (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                 unless Otherwise Stated)


   Asumsi-asumsi signifikan yang digunakan dalam                                 The significant assumptions used in calculations are
   perhitungan tersebut adalah sebagai berikut:                                  as follows:

                                                     31 Desember 2024/December 31, 2024

    Tingkat mortalitas                              Tabel Mortalitas Indonesia 2019 (TMI IV)/                 Mortality table
                                                    Indonesian Mortality Table 2019 (TMI IV)
    Tingkat diskonto                                           7,10 per tahun/year                            Discount rate
    Tingkat kenaikan gaji                                      7,50 per tahun/year                            Salary increase rate
    Tingkat kecacatan                                        10% dari tabel mortalitas/                       Percentage of disability
                                                              10% from mortality rate
    Usia pensiun maksimum                                         55 tahun/years                              Maximum pension rate
    Tingkat pengunduran diri              10,00% untuk karyawan sampai dengan 25 tahun dan menurun            Resignation rate
                                                  secara linear sampai 1% pada umur 45 tahun/
                                             10.00% for employees up to the age of 25 and will linearly
                                                        decrease until 1% at the age of 45

   Beban imbalan kerja karyawan yang diakui dalam                                The employee benefit expenses recognized in the
   laporan laba rugi dan penghasilan komprehensif lain                           consolidated statement of profit or loss and other
   konsolidasian adalah sebagai berikut:                                         comprehensive income are as follows:

                                                             Tiga bulan/Three months
                                                                31 Maret/March 31 ,
                                                             (Tidak Diaudit/Unaudited )
                                                             2025                 2024

    Beban jasa kini                                             159.423             156.992     Current service cost
    Beban bunga                                                  73.294              60.787     Interest cost

    Jumlah beban imbalan kerja (Catatan 28)                     232.717             217.779     Total employee benefit expense (Note 28)

   Rekonsiliasi atas liabilitas imbalan kerja karyawan                           Reconciliation of employee benefits liability are as
   adalah sebagai berikut:                                                       follows:

                                                            31 Maret/
                                                           March 31 ,
                                                              2025           31 Desember/
                                                         (Tidak Diaudit/     December 31 ,
                                                           Unaudited )           2024

    Nilai kini liabilitas imbalan pasti                        5.930.803           5.851.049     Present value of defined benefit liability
    Nilai wajar aset program                                  (1.665.248)         (1.693.941)    Fair value of plan assets

    Liabilitas imbalan kerja karyawan                         4.265.555           4.157.108      Employee benefit liability




                                                                    - 89 -
Page 96
PT GOLDEN ENERGY MINES Tbk                                                                     PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                         AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                          Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                     As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                              and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                         March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                               (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                               unless Otherwise Stated)


   Mutasi atas nilai kini liabilitas manfaat pasti adalah                      Movements in present value of defined benefit
   sebagai berikut:                                                            liability are as follows:

                                                           31 Maret/
                                                          March 31 ,
                                                             2025           31 Desember/
                                                        (Tidak Diaudit/     December 31 ,
                                                          Unaudited )           2024

    Saldo awal                                               5.851.049          5.542.614    Beginning balance
    Biaya jasa kini                                            159.423            668.376    Current service cost
    Biaya bunga                                                 73.294            349.559    Interest cost
    Beban jasa lalu dan keuntungan                                                           Past service cost and gain on
       dari penyelesaian manfaat pasti                               -            (64.367)      settlement of defined benefit
    Imbalan kerja yang dibayarkan                                    -           (124.280)   Employement benefits directly paid
    Liabilitas imbalan kerja yang di transfer                        -            (27.355)   Transferred liability for transferred employees
    Dampak perubahan dari asumsi keuangan                            -           (188.469)   Effect of change in financial assumptions
    Penyesuaian pengalaman nilai liabilitas                          -            (59.863)   Experience adjustment on liabilities
    Penyesuaian selisih kurs mata uang asing                  (152.963)          (245.166)   Foreign exchange adjustment

    Saldo akhir                                              5.930.803          5.851.049    Ending balance

   Mutasi atas nilai wajar aset program adalah sebagai                         Movement in fair value of plan assets are as follows:
   berikut:

                                                           31 Maret/
                                                          March 31 ,
                                                             2025           31 Desember/
                                                        (Tidak Diaudit/     December 31 ,
                                                          Unaudited )           2024

    Saldo awal                                               1.693.941          1.703.437    Beginning balance
    Pendapatan bunga                                                 -            107.389    Interest income
    Kontribusi karyawan                                          9.216             86.652    Contribution by employees
    Pembayaran manfaat                                               -           (121.404)   Benefits payment
    Pengembalian aset program                                        -             (3.183)   Return on the plan assets
    Penyesuaian selisih kurs mata uang asing                   (37.909)           (78.950)   Foreign exchange adjustment

    Saldo akhir                                              1.665.248          1.693.941    Ending balance

   Mutasi liabilitas imbalan kerja karyawan di laporan                         The movements of employee benefits liability in the
   posisi keuangan konsolidasian adalah sebagai                                consolidated statement of financial position are as
   berikut:                                                                    follows:
                                                           31 Maret/
                                                          March 31 ,
                                                             2025           31 Desember/
                                                        (Tidak Diaudit/     December 31 ,
                                                          Unaudited )           2024

    Saldo awal                                               4.157.108          3.839.177    Beginning balance
    Beban (penghasilan) imbalan kerja                                                        Employee benefit expense (income)
       tahun berjalan dibebankan ke:                                                           for the year charge to:
       Laba rugi                                               232.717            846.179      Profit or loss
       Penghasilan komprehensif lainnya                              -           (244.630)     Other comprehensive income
    Imbalan kerja yang langsung dibayarkan                           -             (2.876)   Employee benefit directly paid
    Liabilitas imbalan kerja karyawan yang ditransfer                -            (27.355)   Transferred liability for transferred employee
    Kontribusi karyawan                                         (9.216)           (86.652)   Contribution by employee
    Penyesuaian selisih kurs mata uang asing                  (115.054)          (166.735)   Foreign exchange adjustment

    Saldo akhir                                              4.265.555          4.157.108    Ending balance




                                                                   - 90 -
Page 97
PT GOLDEN ENERGY MINES Tbk                                                                       PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                           AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                            Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                       As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                           March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                 (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                 unless Otherwise Stated)


   Pada tanggal 31 Desember 2024, analisa                                       As of December 31, 2024, sensitivity analysis to the
   sensitivitas terhadap asumsi utama yang digunakan                            key assumptions used in determining employee
   dalam menentukan liabilitas imbalan kerja adalah                             benefits liability are as follows:
   sebagai berikut:

                                                     31 Desember/December 31 ,
                                                                2024
                                                     Kenaikan/       Penurunan/
                                                    Increase of      Decrease of
                                                        1%               1%

                  Perubahan tingkat diskonto                                            Change in discount rate
                    Dampak pada nilai kini                                                Effect on present value of
                      liabilitas imbalan kerja         (439.732)            486.854          employee benefits liability

                  Perubahan tingkat kenaikan gaji                                       Change in salary increase rate
                    Dampak pada nilai kini                                                Effect on present value of
                      liabilitas imbalan kerja          565.981          (515.541)           employee benefits liability

   Pembayaran kontribusi yang diharapkan dari                                   The following payments are expected contribution
   liabilitas imbalan kerja pada tahun mendatang                                to the employee benefit liability in the future years:
   adalah sebagai berikut:

                                                               31 Desember/
                                                               December 31 ,
                                                                   2024

            Jatuh tempo ≤ 1 tahun                                     405.646         Maturity ≤ 1 year
            Jatuh tempo > 1 tahun dan ≤ 5 tahun                     1.481.475         Maturity > 1 year and ≤ 5 years
            Jatuh tempo > 5 tahun dan ≤ 10 tahun                    4.585.946         Maturity > 5 years and ≤ 10 years
            Jatuh tempo > 10 tahun                                 26.100.947         Maturity > 10 years

            Jumlah                                                 32.574.014         Total

   Pada tanggal 31 Desember 2024, rata-rata(dalam                               As of December 31, 2024, the average duration
   tahun) dari liabilitas imbalan kerja karyawan masing-                        (in years) of the employee benefits liability is
   masing berkisar antara 5,7 - 12,4 tahun.                                     approximately from 5.7 - 12.4 years.


32. Goodwill                                                                32. Goodwill

   Nilai tercatat goodwill adalah sebagai berikut:                              The carrying value of goodwill is as follows:

                                                        31 Maret/
                                                       March 31 ,
                                                          2025               31 Desember/
                                                     (Tidak Diaudit/         December 31 ,
                                                       Unaudited )               2024

    Saldo awal                                           17.206.169             24.391.364         Beginning balance
    Dikurangi:                                                                                     Less:
      Kerugian penurunan nilai                                       -           (7.185.195)         Impairment losses

    Saldo akhir                                          17.206.169             17.206.169         Ending balance

   Seperti diungkapkan pada Catatan 2q, Grup                                    As disclosed in Note 2q, the Group performed
   melakukan pengujian penurunan nilai pada tanggal                             impairment tests on December 31, 2024 on its
   31 Desember 2024, atas goodwill yang tercatat di                             goodwill reported in the consolidated statement of
   laporan posisi keuangan konsolidasian.                                       financial position on that date.




                                                                   - 91 -
Page 98
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


   Goodwill tersebut dialokasikan ke UPK terkait untuk               Such goodwill was allocated to the individual CGU
   pengujian penurunan nilai pada tahun 2024                         for impairment testing in 2024 (annual testing), the
   (pengujian tahunan), yaitu tambang batubara                       coal mines of BORNEO, BSL, KIM, KIS, BBU, BBM,
   BORNEO, BSL, KIM, KIS, BBU, BBM, KCP, TBBU,                       KCP, TBBU, BHBA. BNP, BSA, WRL and TKS.
   BHBA, BNP, BSA, WRL dan TKS.

   Pada tahun 2024, berdasarkan hasil pengujian                      In 2024, based on the results of impairment testing
   penurunan nilai yang dilakukan, Grup mengakui                     performed, the Group recognized impairment
   kerugian penurunan nilai atas UPK yang terkait                    losses on the CGUs associated to the coal mines of
   dengan tambang Batubara BSA, WRL, dan TKS                         BSA, WRL and TKS amounting to US$ 15,020,682.
   sebesar US$ 15.020.682. Kerugian penurunan nilai                  The impairment losses recognized are allocated to
   tersebut yang diakui dialokasikan pada Goodwill                   goodwill first, and then, to the mine properties
   terlebih dahulu, kemudian pada aset pertambangan                  amounting to US$ 7,185,195 and US$ 7,835,487
   masing-masing sebesar US$ 7.185.195 dan                           (Note 11), respectively.
   US$ 7.835.487 (Catatan 11).

   Tingkat diskonto yang digunakan dalam pengujian                   The discount rate used is 10.29% in the impairment
   penurunan nilai tahun 2024 adalah sebesar 10,29%                  testing performed in 2024, which is derived from
   yang dihitung dengan mengacu kepada Biaya Modal                   Weighted Average Cost of Capital (WACC).
   Rata-rata Tertimbang (WACC).

   Manajemen menilai asumsi utama yang digunakan                     Management assessed the key assumptions used
   dalam menentukan jumlah yang dapat dipulihkan                     in determining the recoverable amounts of the
   dari UPK dan mengakui kerugian penurunan nilai                    CGUs and recognized impairment losses in 2024.
   pada tahun 2024. Penurunan nilai mencerminkan                     The impairment reflected a reduction in the
   pengurangan jumlah yang dapat dipulihkan karena                   recoverable amounts due to declining coal prices
   penurunan harga batubara dan peningkatan biaya                    and increased operating costs. While management
   operasional. Meskipun manajemen yakin asumsi                      believes the assumptions used are reasonable, any
   yang digunakan wajar, adanya perubahan lebih                      further unfavorable changes in these assumptions
   lanjut yang tidak menguntungkan dalam asumsi ini                  may      result     in   additional   impairment
   mungkin akan mempengaruhi penurunan nilai                         losses in the future.
   dimasa depan.


33. Perpajakan                                                    33. Taxation

   a.   Pajak Dibayar Dimuka                                         a.    Prepaid Taxes

                                                    31 Maret/
                                                   March 31 ,
                                                      2025             31 Desember/
                                                 (Tidak Diaudit/       December 31 ,
                                                   Unaudited )             2024

        Pajak penghasilan:                                                              Income taxes:
          Pasal 4 (2)                                  231.493                      -      Article 4 (2)
          Pasal 21                                           -                 41.964      Article 21
          Pasal 22                                     175.796                689.218      Article 22
          Pasal 23                                     300.001              1.095.677      Article 23
          Pasal 25                                     846.547              1.019.980      Article 25
        Pajak pertambahan nilai - bersih           105.794.875            118.502.913   Value added tax - net

        Jumlah                                     107.348.712            121.349.752   Total




                                                         - 92 -
Page 99
PT GOLDEN ENERGY MINES Tbk                                                               PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                   AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                    Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                               As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                        and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                   March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                         (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                         unless Otherwise Stated)


   b.   Utang Pajak                                                     b.   Taxes Payable

                                                        31 Maret/
                                                       March 31 ,
                                                          2025           31 Desember/
                                                     (Tidak Diaudit/     December 31 ,
                                                       Unaudited )           2024

        Pajak penghasilan badan                          10.253.696             341.366    Corporate income tax
        Pajak penghasilan:                                                                 Income taxes:
          Pasal 4 (2)                                       107.796             257.813       Article 4 (2)
          Pasal 15                                          127.236             150.590       Article 15
          Pasal 21                                          840.355                   -       Article 21
          Pasal 22                                           17.213              12.810       Article 22
          Pasal 23                                        6.198.623           3.464.846       Article 23
        Pajak pertambahan nilai - bersih                    187.679             319.692    Value added tax - net

        Jumlah                                           17.732.598           4.547.117    Total

   c.   Estimasi Tagihan Pajak                                          c.   Estimated Claims for Tax Refund

                                                        31 Maret/
                                                       March 31 ,
                                                          2025           31 Desember/
                                                     (Tidak Diaudit/     December 31 ,
                                                       Unaudited )           2024

        Perusahaan                                       2.049.971            1.195.362    The Company
        Entitas anak                                    22.711.411           23.712.425    Subsidiaries

        Jumlah estimasi tagihan pajak (Catatan 13)      24.761.382           24.907.787    Total estimated claims for tax refund (Note 13)

   d.   Pajak Penghasilan                                               d.   Corporate Income Tax

        Rincian dari beban pajak penghasilan adalah                          Details of income tax expense are as follows:
        sebagai berikut:

                                                         Tiga bulan/Three months
                                                            31 Maret/March 31 ,
                                                         (Tidak Diaudit/Unaudited)
                                                         2025                2024

        Perusahaan                                                                         The Company
          Tangguhan                                         (17.460)            (14.769)     Deferred

        Entitas Anak                                                                       Subsidiaries
          Kini                                          32.822.432           51.337.106      Current
          Tangguhan                                       (249.317)              48.345      Deferred
        Jumlah                                          32.573.115           51.385.451    Total

        Jumlah beban pajak                              32.555.655           51.370.682    Total tax expense




                                                           - 93 -
Page 100
PT GOLDEN ENERGY MINES Tbk                                                                PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                    AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                     Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                         and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                    March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                          (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                          unless Otherwise Stated)


   e.   Hasil Pemeriksaan Pajak                                            e.    Tax Assessment Results

         No.                     Jenis/Type                                                Deskripsi/Description

         Periode yang Berakhir pada tanggal 31 Maret 2025/Period Ended March 31, 2025

         BORNEO

          1.       SKPKB PPh Badan tahun fiskal 2020           Pada tanggal 29 Juli 2024, BORNEO menerima Surat Ketetapan Pajak
                   sebesar US$ 655.732/                        Kurang Bayar (SKPKB) atas Pajak Penghasilan Badan untuk tahun fiskal
                   SKPKB of Corporate Income Tax for fiscal    2020 sebesar US$ 655.732 yang terdiri dari US$ 461.004 atas kekurangan
                   year 2020 amounting to US$ 149,254.         Pajak Penghasilan dan US$ 194.728 atas bunga. Pada tanggal 26 Agustus
                                                               2024, BORNEO melakukan pembayaran atas SKPKB tersebut yang dicatat
                                                               sebagai bagian dari akun "Beban (manfaat) pajak penghasilan badan - Kini -
                                                               Penyesuaian pajak penghasilan badan tahun sebelumnya" pada laporan laba
                                                               rugi dan penghasilan komprehensif lainnya konsolidasian/
                                                               On July 29, 2024, BORNEO received SKPKB for Corporate Income Tax for
                                                               fiscal year 2020 amounting to US$ 655,732, which consisted of US$ 461,004
                                                               for income tax underpayment and US$ 194,728 for interest. On Agustus 26,
                                                               2024, BORNEO settled the SKPKB which is recorded as part of “Corporate
                                                               income tax expense (benefit) - Current - Adjustment of prior year corporate
                                                               income tax" account in the consolidated statement of profit or loss and other
                                                               comprehensive income.

          2.       SKPKB PPh Badan tahun fiskal 2023           Pada tanggal 26 Agustus 2024, BORNEO menerima Surat Ketetapan Pajak
                   sebesar US$ 5.870.280/                      Kurang Bayar (SKPKB) atas Pajak Penghasilan Badan untuk tahun fiskal
                   SKPKB of Corporate Income Tax for fiscal    2023 sebesar US$ 5.870.280 yang terdiri dari US$ 5.131.363 atas
                   year 2023 amounting to US$ 5,870,280.       kekurangan Pajak Penghasilan dan US$ 738.917 atas bunga. Pada tanggal
                                                               25 September 2024, BORNEO melakukan pembayaran atas SKPKB tersebut
                                                               yang dicatat sebagai bagian dari akun "Beban (manfaat) pajak penghasilan
                                                               badan - Kini - Penyesuaian pajak penghasilan badan tahun sebelumnya" pada
                                                               laporan laba rugi dan penghasilan komprehensif lainnya konsolidasian/
                                                               On August 26, 2024, BORNEO received SKPKB for Corporate Income Tax for
                                                               fiscal year 2023 amounting to US$ 5,870,280, which consisted of
                                                               US$ 5,131,363 for income tax underpayment and US$ 738,917 for interest.
                                                               On September 25, 2024, BORNEO settled the SKPKB which is recorded as
                                                               part of “Corporate income tax expense (benefit) - Current - Adjustment of prior
                                                               year corporate income tax" account in the consolidated statement of profit or
                                                               loss and other comprehensive income.

          3.       SKPKB PPh Badan tahun fiskal 2022           Pada tanggal 20 Desember 2024, BORNEO menerima Surat Ketetapan Pajak
                   sebesar US$ 2.298.652/                      Kurang Bayar (SKPKB) atas Pajak Penghasilan Badan untuk tahun fiskal
                   SKPKB of Corporate Income Tax for fiscal    2022 sebesar US$ 2.298.652 yang terdiri dari US$ 1.597.173 atas
                   year 2022 amounting to US$ 2,298,652.       kekurangan Pajak Penghasilan dan US$ 701.479 atas bunga. Pada tanggal
                                                               17 Januari 2025, BORNEO melakukan pembayaran atas SKPKB tersebut
                                                               yang dicatat sebagai bagian dari akun "Beban (manfaat) pajak penghasilan
                                                               badan - Kini - Penyesuaian pajak penghasilan badan tahun sebelumnya" pada
                                                               laporan laba rugi dan penghasilan komprehensif lainnya konsolidasian/
                                                               On December 20, 2024, BORNEO received SKPKB for Corporate Income Tax
                                                               for fiscal year 2022 amounting to US$ 2,298,652, which consisted of
                                                               US$ 1,597,173 for income tax underpayment and US$ 701,479 for interest.
                                                               On January 17, 2025, BORNEO settled the SKPKB which is recorded as part
                                                               of “Corporate income tax expense (benefit) - Current - Adjustment of prior year
                                                               corporate income tax" account in the consolidated statement of profit or loss
                                                               and other comprehensive income.




                                                              - 94 -
Page 101
PT GOLDEN ENERGY MINES Tbk                                                                                                  PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                      AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                       Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                  As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                           and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                      March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                            (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                            unless Otherwise Stated)


   Rekonsiliasi Fiskal                                                                                       Fiscal Reconciliation

   Rekonsiliasi fiskal antara laba (rugi) sebelum pajak                                                      A reconciliation between profit (loss) before
   penghasilan badan, sebagaimana tercantum dalam                                                            corporate income tax, as shown in the consolidated
   laporan laba rugi dan penghasilan komprehensif lain                                                       statement of profit or loss and other comprehensive
   konsolidasian, dengan rugi fiskal adalah sebagai                                                          income, and fiscal loss is as follows:
   berikut:

                                                                                 Tiga bulan/Three months
                                                                                    31 Maret/March 31 ,
                                                                                 (Tidak Diaudit/Unaudited )
                                                                                  2025                        2024

    Laba sebelum pajak penghasilan badan                                                                                         Profit before tax per consolidated
      menurut laporan laba rugi dan penghasilan                                                                                    statements of profit or loss and
      komprehensif lain konsolidasian                                          146.821.944                 226.504.115             other comprehensive income
    Dikurangi:                                                                                                                   Less:
      Laba sebelum pajak entitas anak                                          147.195.023                 229.724.345             Profit before tax of the subsidiaries
    Rugi sebelum pajak Perusahaan                                                   (373.079)                (3.220.230)         Loss before tax - the Company

    Perbedaan temporer:                                                                                                          Temporary differences:
      Amortisasi aset pertambangan dari                                                                                            Amortization of mine properties from
        kombinasi bisnis                                                              30.308                        72.177            business combination
      Beban imbalan kerja                                                             18.837                        18.713         Employee benefits expense
      Selisih penyusutan fiskal dan                                                                                                Difference in fiscal and commercial
        komersial                                                                               -                    (7.508)          depreciation

    Perbedaan tetap:                                                                                                             Permanent differences:
      Pendapatan yang pajak                                                                                                        Income already subjected to final
        penghasilannya bersifat final                                               (835.229)                      (473.719)          income tax
      Aset hak-guna                                                                  (85.835)                       (36.316)       Right-of-use assets
      Beban yang tidak dapat dikurangkan                                              10.510                          2.656        Non-deductible expenses

    Rugi fiskal                                                                  (1.234.488)                 (3.644.227)         Fiscal loss

   Pajak Tangguhan                                                                                           Deferred Taxes

   Rincian pajak tangguhan adalah sebagai berikut:                                                           The details of the deferred tax are as follows:

                                                            Dibebankan (Dikreditkan) pada/ Charged (Credited) to
                                                                                                                                          31 Maret 2025/
                                                                                                   Selisih kurs/                          March 31, 2025
                                         1 Januari 2025/    Laba Rugi/         Ekuitas/         Foreign exchange       Penyesuaian/       (Tidak Diaudit
                                         January 1, 2025   Profit or Loss      Equity               difference          Adjustment          Unaudited )

   Aset pajak tangguhan                                                                                                                                      Deferred tax assets
     Rugi fiskal                              2.926.951        (508.557)                  -              668.192                      -          3.086.586     Fiscal loss
      Aset aktivitas pengupasan
         lapisan tanah                         726.090                -                   -                   27                      -            726.117      Stripping activity assets
      Aset tetap                               499.831          121.954                   -              (55.101)                     -            566.684      Property and equipment
      Liabiltas imbalan kerja                  912.792           47.230                   -              (21.581)                     -            938.441      Employee benefits liability
      Penyisihan reklamasi dan                                                                                                                                  Provision for reclamation and
         penutupan tambang                    1.351.756          50.650                   -              (42.270)                     -          1.360.136          mine closure

   Jumlah                                     6.417.420        (288.723)                  -              549.267                      -          6.677.964   Total

   Liabilitas pajak tangguhan                                                                                                                                Deferred tax liabilities
      Aset pertambangan dari kombinasi                                                                                                                         Mine properties from
           bisnis                           15.752.245            (6.233)                 -                1.902                      -         15.747.914         business combination




                                                                                              - 95 -
Page 102
PT GOLDEN ENERGY MINES Tbk                                                                                                  PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                      AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                       Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                  As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                           and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                      March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                            (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                            unless Otherwise Stated)


                                                            Dibebankan (Dikreditkan) pada/ Charged (Credited) to
                                                                                                 Selisih kurs/
                                          1 Januari 2024/    Laba Rugi/        Ekuitas/       Foreign exchange         Penyesuaian/          31 Desember 2024/
                                          January 1, 2024   Profit or Loss      Equity            difference            Adjustment           December 31, 2024

    Aset pajak tangguhan                                                                                                                                         Deferred tax assets
      Rugi fiskal                             5.119.353       (1.996.771)                 -            (195.631)                      -              2.926.951     Fiscal loss
      Aset aktivitas pengupasan
          lapisan tanah                         726.038                                  -                   52                       -                726.090      Stripping activity assets
      Aset tetap                                498.494         131.671                  -             (130.334)                      -                499.831      Property and equipment
      Liabiltas imbalan kerja                   844.619         151.070            (42.611)             (40.286)                      -                912.792      Employee benefits liability
      Penyisihan reklamasi dan                                                                                                                                      Provision for reclamation and
          penutupan tambang                   1.314.434          80.214                   -             (42.892)                      -              1.351.756          mine closure

    Jumlah                                    8.502.938       (1.633.816)          (42.611)            (409.091)                      -              6.417.420   Total

    Liabilitas pajak tangguhan                                                                                                                                   Deferred tax liabilities
       Aset pertambangan dari kombinasi                                                                                                                            Mine properties from
            bisnis                           23.026.168          (88.728)                 -                    -           (7.185.195)              15.752.245         business combination


   Manajemen berpendapat bahwa aset pajak                                                                   Management believes that deferred tax assets can
   tangguhan dapat terpulihkan seluruhnya terhadap                                                          be utilized against future taxable income before the
   penghasilan kena pajak dimasa yang akan datang                                                           utilization period of fiscal losses expires.
   sebelum masa manfaat pajak tersebut berakhir.

   Rekonsiliasi antara beban pajak dan hasil perkalian                                                      The reconciliation between the total tax expense
   rugi sebelum pajak Perusahaan dengan tarif pajak                                                         and the amounts computed by applying the effective
   yang berlaku adalah sebagai berikut:                                                                     tax rate to loss before tax of the Company is as
                                                                                                            follows:
                                                                                    Tiga bulan/Three months
                                                                                       31 Maret/March 31 ,
                                                                                    (Tidak Diaudit/Unaudited )
                                                                                    2025                2024

    Laba sebelum pajak penghasilan badan                                                                                                  Profit before tax per consolidated
      menurut laporan laba rugi dan penghasilan                                                                                             statements of profit or loss and
      komprehensif lain konsolidasian                                            146.821.944                  226.504.115                   other comprehensive income
    Dikurangi:                                                                                                                            Less:
      Laba sebelum pajak entitas anak                                            147.195.023                  229.724.345                   Profit before tax of the subsidiaries
    Rugi sebelum pajak Perusahaan                                                     (373.079)                    (3.220.230)            Loss before tax - the Company
    Beban (penghasilan) pajak dengan
      tarif yang berlaku                                                                (82.077)                    (708.451)             Tax expense (benefit) at effective tax rate

    Penyesuaian pajak penghasilan badan                                                                                                   Adjustment of prior year corporate
      tahun sebelumnya                                                                 271.588                       801.730                income tax
    Selisih kurs karena penjabaran                                                                                                        Exchange difference due to financial
      laporan keuangan                                                                    (6.649)                       3.575               statements translation

    Pengaruh atas perbedaan tetap:                                                                                                        Tax effect of permanent differences:
      Pendapatan keuangan yang
        dikenakan pajak final                                                         (183.750)                     (104.218)               Finance income subject to final tax
      Aset hak guna                                                                    (18.884)                       (7.990)               Right-of-use assets
      Beban yang tidak dapat dikurangkan                                                 2.312                           584                Non-deductible expense
    Perusahaan                                                                          (17.460)                     (14.769)             The Company
    Entitas anak                                                                   32.573.115                  51.385.451                 Subsidiaries

    Beban pajak penghasilan                                                        32.555.655                  51.370.682                 Total tax expense




                                                                                              - 96 -
Page 103
PT GOLDEN ENERGY MINES Tbk                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                      unless Otherwise Stated)


   Tarif Pajak                                                        Tax Rates

   Pada tanggal 7 Oktober 2021, Dewan Perwakilan                      On October 7, 2021, the House of Representatives
   Rakyat Republik Indonesia mengesahkan Undang-                      of the Republic of Indonesia passed the Law on the
   Undang Harmonisasi Peraturan Perpajakan, yang                      Harmonization of Tax Regulations, which stipulates
   antara lain menetapkan Tarif pajak penghasilan                     a corporate income tax rate of 22%. The Company
   badan adalah sebesar 22%. Perusahaan sebagai                       as a domestic public company taxpayer with a total
   wajib pajak perusahaan publik dalam negeri dengan                  number of shares on the stock exchange of
   jumlah saham beredar pada bursa efek di Indonesia                  Indonesia of at least 40% meeting certain
   paling sedikit 40% dan memenuhi persyaratan                        requirements of Government Regulation, can avail
   tertentu sebagaimana diatur berdasarkan Peraturan                  of further 3% reduction from the tax rate as
   Pemerintah, memperoleh tarif 3% lebih rendah dari                  mentioned above.
   tarif pajak penghasilan badan yang disebutkan di
   atas.

   Grup menerapkan tarif pajak penghasilan badan                      The Group has adopted the change of the new
   tersebut dalam perhitungan pajaknya.                               corporate income tax rate in computing its income
                                                                      taxes.


34. Laba per Saham                                                34. Earnings per Share

   Perhitungan laba per saham dasar adalah sebagai                    The calculation of basic earnings per share follows:
   berikut:

                                                   Tiga bulan/Three months
                                                      31 Maret/March 31 ,
                                                   (Tidak Diaudit/Unaudited )
                                                   2025                2024
    Laba yang dapat diatribusikan kepada                                            Profit attributable to owners of
      Pemilik Entitas Induk (dalam US$)          113.041.381          171.718.367     the Parent Company (in US$)

    Rata-rata tertimbang jumlah saham beredar                                       Weighted average number of shares
      selama tahun berjalan                     5.882.353.000       5.882.353.000    outstanding during the year

    Laba per saham dasar (dalam US$)                   0,019                0,029   Basic earnings per share (in US$)



35. Transaksi dengan Pihak Berelasi                               35. Transactions with Related Parties

   Sifat Pihak Berelasi                                               Nature of Relationships

   Sifat hubungan dengan pihak berelasi adalah                        The nature of the related party relationship is as
   sebagai berikut:                                                   follows:

   a.    Perusahaan     yang     berada     di   bawah                a.   The Company under common control, i.e.
         pengendalian bersama melalui sebagian                             having the same ownership and/or directors
         kepemilikan yang sama dan/atau memiliki                           and/or commissioners with the Group.
         sebagian direksi dan/atau komisaris yang sama
         dengan Grup.

    b.   Perusahaan yang berada di bawah Grup                         b.   The companies under the Sinarmas Group.
         Sinarmas.




                                                         - 97 -
Page 104
PT GOLDEN ENERGY MINES Tbk                                                                                 PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                     AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                      Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                 As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                          and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                     March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                           (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                           unless Otherwise Stated)


   c.   PT Indah Kiat Pulp & Paper Tbk,                                                   c.      PT Indah Kiat Pulp & Paper Tbk,
        PT Lontar Papyrus Pulp & Paper Industry dan                                               PT Lontar Papyrus Pulp & Paper Industry
        PT Pabrik Kertas Tjiwi Kimia Tbk adalah pihak                                             and PT Pabrik Kertas Tjiwi Kimia Tbk are
        berelasi karena hubungan keluarga dengan                                                  related parties due to family relationships with
        pemegang saham akhir, tetapi tidak memiliki:                                              the ultimate shareholders, but do not have:
        (i) pengaruh signifikan; (ii) kesamaan                                                    (i) significant influence; (ii) common control and
        pengendalian dan kepemilikan; dan (iii)                                                   ownership; and (iii) similarity of key
        kesamaan personil manajemen kunci.                                                        management personel.

   d.   PT Cipta Kridatama, PT Trakindo Utama,                                            d.      PT Cipta Kridatama, PT Trakindo Utama,
        dan PT Tunas Inti Abadi merupakan                                                         and PT Tunas Inti Abadi belong to the same
        perusahaan dalam satu Grup dengan                                                         Group of PT Radhika Jananta Raya,
        PT Radhika Jananta Raya, pemegang saham.                                                  a shareholder.

   Tidak terdapat transaksi dengan pihak berelasi baik                                    There are no transactions with related parties that
   yang langsung atau tidak langsung berhubungan                                          directly or indirectly related with main business of
   dengan kegiatan usaha utama Grup, yang                                                 the Group and identified as conflict of interest based
   didefinisikan    sebagai     transaksi   benturan                                      on OJK Regulation (POJK) No. 42/POJK.04/2020
   kepentingan berdasarkan peraturan OJK (POJK)                                           regarding “Affiliated Transactions and Conflict of
   No. 42/POJK.04/2020 tentang “Transaksi Afiliasi                                        Interest Transactions”.
   dan Transaksi Benturan Kepentingan“.

   Transaksi dengan Pihak Berelasi                                                        Transactions with Related Parties

   a.   Akun-akun terkait transaksi dengan pihak                                          a.      The accounts involving transactions with
        berelasi adalah sebagai berikut:                                                          related parties are as follows:

                                                                                              Persentase terhadap Jumlah
                                                                                                     Aset/Liabilitas/
                                                                                          Percentage to Total Assets/Liabilities
                                                  31 Maret 2025/                           31 Maret 2025/
                                                  March 31, 2025         31 Desember/     March 31, 2025           31 Desember/
                                                  (Tidak Diaudit/        December 31 ,     (Tidak Diaudit/         December 31 ,
                                                    Unaudited )              2024            Unaudited )               2024
                                                                                                 %                      %
        Aset Lancar                                                                                                                Current Assets
        Kas dan setara kas                                                                                                         Cash and cash equivalents
          PT Bank Sinarmas Tbk                           1.611.256          32.627.796                  0,12                2,63     PT Bank Sinarmas Tbk
          PT Bank Nano Syariah (dahulu PT Bank                                                                                       PT Bank Nano Syariah (formerly PT Bank
             Sinarmas Tbk - Unit Usaha Syariah)            337.519           5.704.086                  0,03                0,46        Sinarmas Tbk - Sharia Business Unit)
        Jumlah                                           1.948.775          38.331.882                  0,15                3,09     Total

        Piutang usaha                                                                                                              Trade receivables
           PT DSSP Power Kendari                         6.270.480           5.535.666                  0,49                0,45      PT DSSP Power Kendari
           PT Lontar Papyrus Pulp & Paper                                                                                             PT Lontar Papyrus Pulp & Paper
              Industry                                   1.485.719             450.354                  0,12                0,04        Industry
           PT Sinar Mas Agro Resources and                                                                                            PT Sinar Mas Agro Resources and
              Technology Tbk                             1.402.050           1.249.358                  0,11                0,10        Technology Tbk
           PT Indah Kiat Pulp & Paper Tbk                1.120.016           2.977.575                  0,09                0,24      PT Indah Kiat Pulp & Paper Tbk
           PT Soci Mas                                     665.038                   -                  0,05                0,00      PT Soci Mas
           PT Ivo Mas Tunggal                              625.957             615.009                  0,05                0,05      PT Ivo Mas Tunggal
           PT Sinarmas Bio Energi                          461.804                   -                  0,04                0,00      PT Sinarmas Bio Energi

        Jumlah                                          12.031.064          10.827.962                  0,95                0,88   Total

        Uang muka dan biaya dibayar dimuka                                                                                         Advances and prepaid expenses
          Uang muka                                                                                                                  Advances
             Pemasok                                                                                                                    Supplier
               PT Hutan Rindang Banua                    1.763.711           1.763.711                  0,14                0,14          PT Hutan Rindang Banua
          Biaya dibayar dimuka - Asuransi                                                                                            Prepaid expenses - Insurance
             PT Asuransi Sinarmas                                   20           2.794                  0,00                0,00        PT Asuransi Sinarmas
        Jumlah                                           1.763.731           1.766.505                  0,14                0,14     Total




                                                                             - 98 -
Page 105
PT GOLDEN ENERGY MINES Tbk                                                                                   PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                       AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                        Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                   As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                            and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                       March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                             (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                             unless Otherwise Stated)

                                                                                                Persentase terhadap Jumlah
                                                                                                       Aset/Liabilitas/
                                                                                            Percentage to Total Assets/Liabilities
                                                      31 Maret 2025/                         31 Maret 2025/
                                                      March 31, 2025      31 Desember/      March 31, 2025           31 Desember/
                                                      (Tidak Diaudit/     December 31 ,      (Tidak Diaudit/         December 31 ,
                                                        Unaudited )           2024             Unaudited )               2024
                                                                                                   %                      %
       Aset Tidak Lancar                                                                                                             Non-current Assets

       Dana yang dibatasi pencairannya                                                                                               Restricted funds
         PT Bank Sinarmas Tbk                                     6.705           6.882                   0,00                0,00     PT Bank Sinarmas Tbk

       Aset pertambangan - Aktivitas                                                                                                 Mine properties - Stripping
         pengupasan tanah                                                                                                              activity assets
         PT Cipta Kridatama                                    833.810                 -                  0,06                 -       PT Cipta Kridatama

       Aset tidak lancar lainnya                                                                                                     Other non-current assets
         Uang jaminan                                                                                                                  Guarantee deposits
             Sewa gedung, kendaraan                                                                                                       Building, vehicle and heavy
                dan alat berat                                                                                                               equipment rental
                PT Royal Oriental                              239.004          245.304                   0,02                0,02           PT Royal Oriental
             Lain-lain                                                                                                                 Others
                PT Royal Oriental                               27.488           28.212                   0,00                0,00        PT Royal Oriental
       Jumlah                                                  266.492          273.516                   0,02                0,02   Total

       Liabilitas Jangka Pendek                                                                                                      Current Liabilities

       Utang usaha                                                                                                                   Trade payables
          PT Cipta Kridatama                                54.809.253       53.646.974                  10,66                9,27      PT Cipta Kridatama
          PT Tunas Inti Abadi                                  721.587          245.887                   0,14                0,04      PT Tunas Inti Abadi
          PT Indah Kiat Pulp & Paper Tbk                       501.980          515.211                   0,10                0,09      PT Indah Kiat Pulp & Paper Tbk
          PT Hutan Rindang Banua                               451.798          524.424                   0,09                0,09      PT Hutan Rindang Banua
          PT Rolimex Kimia Nusamas                             122.013          135.881                   0,02                0,02      PT Rolimex Kimia Nusamas
          PT Royal Oriental                                     78.410          257.306                   0,02                0,04      PT Royal Oriental
          PT Smartfren Telecom Tbk                              19.280          294.178                   0,00                0,05      PT Smartfren Telecom Tbk
          PT Ivo Mas Tunggal                                     4.905            5.034                   0,00                0,00      PT Ivo Mas Tunggal
          PT Lontar Papyrus Pulp and Paper Industry              4.644            7.979                   0,00                0,00      PT Lontar Papyrus Pulp and Paper Industry
          PT Smart Telecom                                         372              969                   0,00                0,00      PT Smart Telecom
          PT Sinarmas Teladan                                       69               71                   0,00                0,00      PT Sinarmas Teladan
          PT Trakindo Utama                                          -               45                      -                0,00      PT Trakindo Utama
       Jumlah                                               56.714.311       55.633.959                  11,03                9,60   Total

       Utang lain-lain                                                                                                               Other payables
          PT Pabrik Kertas Tjiwi Kimia Tbk                        8.721           8.951                   0,00                0,00     PT Pabrik Kertas Tjiwi Kimia Tbk

       Beban akrual                                                                                                                  Accrued expenses
         Perbaikan dan pemeliharaan jalan                                                                                              Road repairs and maintenance
           PT Wirakarya Sakti                                  108.408          111.265                   0,02                0,02        PT Wirakarya Sakti




                                                                              - 99 -
Page 106
PT GOLDEN ENERGY MINES Tbk                                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                  unless Otherwise Stated)

                                                                                  Persentase terhadap Jumlah
                                                                                    Pendapatan/Beban yang
                                                                                         Bersangkutan/
                                                                                 Percentage to Total Respective
                                                                                      Revenues/Expenses
                                             Tiga bulan/Three months               Tiga bulan/Three months
                                                31 Maret/March 31 ,                   31 Maret/March 31 ,
                                             (Tidak Diaudit/Unaudited )            (Tidak Diaudit/Unaudited )
                                              2025               2024               2025               2024
                                                                                     %                   %

        Pendapatan Usaha                                                                                            Revenues
          PT Indah Kiat Pulp & Paper Tbk     25.229.329         35.051.347                3,89               4,90     PT Indah Kiat Pulp & Paper Tbk
          PT Lontar Papyrus Pulp and                                                                                  PT Lontar Papyrus Pulp and
            Paper Industry                    8.101.652          8.956.743                1,25               1,25       Paper Industry
          PT DSSP Power Kendari               7.136.946          9.426.126                1,10               1,32     PT DSSP Power Kendari
          PT Sinar Mas Agro Resources                                                                                 PT Sinar Mas Agro Resources
            and Technology Tbk                1.333.761          3.405.183                0,21               0,48       and Technology Tbk
          PT SOCI Mas                         1.321.573            755.903                0,20               0,11     PT SOCI Mas
          PT Sinarmas Bio Energi              1.036.208          1.047.857                0,16               0,15     PT Sinarmas Bio Energi
          PT Ivo Mas Tunggal                    636.431            702.952                0,10               0,10     PT Ivo Mas Tunggal
        Jumlah                               44.795.900         59.346.111                6,91               8,29   Total

        Beban pokok penjualan                                                                                       Cost of sales
          Jasa penambangan                                                                                            Mining services
            PT Cipta Kridatama               80.447.673         62.249.311               20,17             16,46         PT Cipta Kridatama
          Overhead pertambangan                                                                                       Mining overhead
            PT Rolimex Kimia Nusamas            282.321            282.530                0,07               0,07        PT Rolimex Kimia Nusamas
          Sewa peralatan                                                                                              Equipment rental
            PT Cipta Kridatama                  251.747              73.262              0,06                0,02        PT Cipta Kridatama
        Jumlah                               80.981.741         62.605.103               20,30             16,55    Total

        Beban penjualan                                                                                             Selling expenses
          Jasa stockpile                                                                                              Stockpile services
            PT Tunas Inti Abadi                 383.979          2.512.126                0,55               3,14         PT Tunas Inti Abadi
          Perbaikan dan pemeliharaan jalan                                                                            Repairs and maintenance
            PT Wirakarya Sakti                  234.000            234.000                0,34               0,29         PT Wirakarya Sakti
        Jumlah                                  617.979          2.746.126                0,89               3,43   Total

        Beban umum dan admininstrasi                                                                                General and administrative expenses
          Asuransi                                                                                                    Insurance
             PT Asuransi Sinarmas                      -              6.499               0,00               0,02        PT Asuransi Sinarmas
          Lain-lain                                                                                                   Others
             PT Smart Telecom                       335                   598             0,00               0,00        PT Smart Telecom
             PT Smartfren Telecom Tbk               221                     -             0,00                  -
        Jumlah                                      556               7.097               0,00               0,02   Total

        Pendapatan bunga                                                                                            Interest income
          Jasa giro                                                                                                    Current accounts
            PT Bank Sinarmas Tbk                  3.587               2.181               0,16               0,10         PT Bank Sinarmas Tbk




   b.   Perusahaan mempunyai kontrak asuransi                                    b.   The Group has insurance contracts with
        dengan PT Asuransi Sinarmas dalam rangka                                      PT Asuransi Sinarmas in relation to insurance
        asuransi aset tetap tertentu (Catatan 9).                                     of certain property and equipment (Note 9).

   c.   Kompensasi Manajemen Kunci                                               c.   Key Management Compensation

        Jumlah imbalan kerja jangka pendek yang                                       Total short-term employee benefits paid to or
        dibayar atau diakru kepada Dewan Komisaris                                    accrued for the Group’s Boards of
        dan Direksi masing-masing sebesar ekuivalen                                   Commissioners and Directors amounted to
        US$ 916.808 dan US$ 698.857 untuk periode                                     equivalent to US$ 916,808 and US$ 698,857,
        tiga bulan yang berakhir pada tanggal                                         respectively, for the three-month periods ended
        31 Maret 2025 dan 2024 (tidak diaudit).                                       March 31, 2025 and 2024 (unaudited).




                                                                 - 100 -
Page 107
PT GOLDEN ENERGY MINES Tbk                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                       unless Otherwise Stated)


   d.   Perjanjian Signifikan dengan Pihak Berelasi                      d.   Significant Agreements with Related Parties

                                                      Jatuh Tempo/
            Pihak/Party         Jenis/Type              Maturities                              Deskirpsi/Description

         PT Purinusa        Perjanjian Jual Beli   30 September 2010           Perusahaan dan entitas anaknya (sebagai penjual)
         Ekapersada dan       Batubara/Coal         s.d 31 Desember            mengadakan perjanjian jual beli batubara dengan
         entitas anak       Sale and Purchase      2025/September 30,          PT Purinusa Ekapersada dan entitas anaknya (sebagai
                                Agreement              2010 up to              pembeli)/
                                                   December 31, 2025           The Company and its subsidiaries (as the seller) entered
                                                                               into a coal sale and purchase agreement with PT Purinusa
                                                                               Ekapersada and its subsidiaries (as the buyer).

         PT Andalan         Perjanjian Jual Beli   5 April 2016 s.d 4          WRL (sebagai penjual) mengadakan perjanjian jual beli
         Satria Lestari       Batubara/Coal          Oktober 2031/             batubara dengan ASL (sebagai pembeli), dimana
         (ASL)              Sale and Purchase      April 5, 2016 up to         berdasarkan Addendum III pada tanggal 4 Oktober 2021,
                                Agreement           October 4, 2031            perjanjian diperpanjang untuk periode 10 tahun dan dapat
                                                                               diperpanjang sesuai dengan kesepakatan tertulis para
                                                                               pihak/
                                                                               WRL (as the seller) entered into coal sale and purchase
                                                                               agreement with ASL (as the buyer), which based on
                                                                               Addenddum III on October 4, 2021, the agreement has
                                                                               extended for a period 10 years and can be extended upon
                                                                               written consent of both parties.

         PT Royal            Perjanjian Sewa       27 Agustus 2012 s.d         Perusahaan (pihak yang menyewa) mengadakan perjanjian
         Oriental            Menyewa Ruang         31 Desember 2024/           sewa menyewa ruang kantor dengan RO (pihak yang
         (RO)                 Kantor/Office          August 27, 2012           menyewakan), dimana RO sepakat untuk menyewakan
                              Space Rental                up to                ruang kantor yang berlokasi di Sinarmas Land Building
                              Agreements              December 31,             Menara 2 Lantai 6/
                                                         2024 *)               The Company (as the lessee) entered into office space
                                                                               rental agreements with RO (as the lessor), where RO
                                                                               agreed to rent an office space which located at Sinarmas
                                                                               Land Building on Tower 2 6th Floor.

         RO                  Perjanjian Sewa       15 September 2021           BORNEO (pihak yang menyewa) mengadakan perjanjian
                             Menyewa Ruang          s.d 31 Desember            sewa menyewa ruang kantor dengan RO (pihak yang
                              Kantor/Office        2024/September 15,          menyewakan), dimana RO sepakat untuk menyewakan
                              Space Rental             2021 up to              ruang kantor yang berlokasi di Sinarmas Land Building
                              Agreements              December 31,             Menara 2 Lantai 6/
                                                         2024 *)               BORNEO (as the lessee) entered into office space rental
                                                                               agreements with RO (as the lessor), where RO agreed to
                                                                               rent an office space which located at Sinarmas Land
                                                                               Building on Tower 2 6th Floor.

         RO                  Perjanjian Sewa       22 November 2021            BORNEO (pihak yang menyewa) mengadakan perjanjian
                             Menyewa Ruang                 s.d                 sewa menyewa ruang kantor dengan RO (pihak yang
                              Kantor/Office        31 Desember 2024/           menyewakan), dimana RO sepakat untuk menyewakan
                              Space Rental         November 22, 2021           ruang kantor yang berlokasi di Sinarmas Land Building
                              Agreements           up to December 31,          Menara 2 Lantai 7/
                                                         2024 *)               BORNEO (as the lessee) entered into office space rental
                                                                               agreements with RO (as the lessor), where RO agreed to
                                                                               rent an office space which located at Sinarmas Land
                                                                               Building on Tower 2 7th Floor.

         RO                  Perjanjian Sewa       5 Desember 2023             BBU (pihak yang menyewa) mengadakan perjanjian sewa
                                Menyewa             s.d 4 Desember             menyewa basement dengan RO (pihak yang menyewakan),
                               Basement/           2026/December 5,            dimana RO sepakat untuk menyewakan basement yang
                             Basement Rental           2023 up to              berlokasi di Sinarmas Land Building Menara 3/
                               Agreements          December 4, 2026            BBU (as the lessee) entered into basement rental
                                                                               agreements with RO (as the lessor), where RO agreed to
                                                                               rent basement which located at Sinarmas Land Building on
                                                                               Tower 3.




                                                         - 101 -
Page 108
PT GOLDEN ENERGY MINES Tbk                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                   unless Otherwise Stated)

                                                Jatuh Tempo/
           Pihak/Party       Jenis/Type           Maturities                              Deskirpsi/Description

        PT Wirakarya          Perjanjian      9 Agustus 2011 s.d       KIM dan beberapa entitas anaknya (KCP, BBU, BHBA, BNP
        Sakti             Penggunaan dan        KIM dan entitas        dan TBBU) mengadakan Perjanjian Penggunaan dan
        (WKS)             Perawatan Jalan    anaknya melakukan         Perawatan Jalan Akses untuk Kegiatan Pengangkutan
                             Akses untuk             kegiatan          Batubara dengan WKS, pihak berelasi, pengelola kawasan
                            Pengangkutan         penambangan           HTI, serta PT Andalan Nusantara Sejahtera (ANS), pihak
                          Batubara/Use and        batubara dan         ketiga, Perusahaan yang ditunjuk WKS untuk melakukan
                           Maintenance of       selama izin Hak        perawatan jalan akses sepanjang 126,61 km (Jalan Akses)/
                           Access Road for   Pengusahaan Hutan         KIM and its certain subsidiaries (KCP, BBU, BHBA, BNP and
                             Coal Hauling      Tanaman Industri        TBBU) entered into a Use and Maintenance of Access Road
                              Agreement      (HPHTI) WKS masih         for Coal Hauling Agreement with WKS, a related party,
                                               berlaku/August 9,       management of an Industrial Forest Concession (HTI), and
                                              2011 up to KIM and       PT Andalan Nusantara Sejahtera (ANS), a third party, the
                                                 its subsidiaries      Company appointed by WKS to conduct maintenance of
                                             conduct coal mining       access road of 126.61 km (Access Road).
                                                activities and as
                                                  long as WKS’
                                                Industrial Forest
                                               Concession Rights
                                              (HPHTI) is still valid

        PT Tunas Inti         Perjanjian     26 Oktober 2010 s.d       BORNEO          mengadakan        Perjanjian     Kerjasama
        Abadi              Pemeliharaan       16 Februari 2036/        Pemeliharaan Jalan Hauling Batubara dengan TIA.
        (TIA)               Jalan Hauling    October 26, 2010 up       Perjanjian tersebut meliputi perawatan jalan sehingga dapat
                              Batubara/        to February 16,         dilintasi BORNEO/
                         Maintenance Road           2036               BORNEO entered into Maintenance Road for Coal Hauling
                          for Coal Hauling                             Cooperation Agreement with TIA. This agreement includes
                             Agreement                                 road maintenance so that BORNEO can pass by.

        PT Cipta           Perjanjian Jasa    14 Februari 2020         KIM     mengadakan         Perjanjian    Kerjasama       Jasa
        Kridatama          Pertambangan/     s.d 2 Oktober 2027/       Pertambangan dengan CK untuk jangka waktu sampai
        (CK)                Coal Mining       February 14, 2020        dengan 2 Oktober 2027 atau tercapainya volume
                             Agreement              up to              overburden kumulatif Kelompok Usaha KIM sebesar
                                               October 2, 2027         226.000.000 BCM, yang mana tercapai terlebih dahulu/
                                                                       KIM has entered into a Coal Mining Agreement with CK,
                                                                       which shall be valid until October 2, 2027 or until KIM Group
                                                                       achieved cumulative 226,000,000 BCM Overburden,
                                                                       whichever comes first.

        CK                 Perjanjian Jasa    14 Februari 2020         KCP     mengadakan        Perjanjian    Kerjasama       Jasa
                           Pertambangan/             s.d               Pertambangan dengan CK untuk jangka waktu sampai
                            Coal Mining       24 Oktober 2028/         dengan 24 Oktober 2028 atau tercapainya volume
                             Agreement        February 14, 2020        overburden kumulatif Kelompok Usaha KIM sebesar
                                                    up to              226.000.000 BCM, yang mana tercapai terlebih dahulu/
                                              October 24, 2028         KCP has entered into a Coal Mining Service Agreement with
                                                                       CK, which shall be valid until October 24, 2028 or until KIM
                                                                       Group achieved cumulative 226,000,000 BCM Overburden,
                                                                       whichever comes first.

        CK                 Perjanjian Jasa    14 Februari 2020         BBU     mengadakan        Perjanjian      Kerjasama       Jasa
                           Pertambangan/       s.d 9 Juli 2029/        Pertambangan dengan CK untuk jangka waktu sampai
                            Coal Mining       February 14, 2020        dengan 9 Juli 2029 atau tercapainya volume overburden
                             Agreement               up to             kumulatif Kelompok Usaha KIM sebesar 226.000.000 BCM,
                                                 July 9, 2029          yang mana tercapai terlebih dahulu/
                                                                       BBU has entered into a Coal Mining Service Agreement with
                                                                       CK, which shall be valid until July 9, 2029 or until KIM Group
                                                                       achieved cumulative 226,000,000 BCM Overburden,
                                                                       whichever comes first.

        CK                 Perjanjian Jasa    14 Februari 2020         BBM     mengadakan       Perjanjian     Kerjasama      Jasa
                           Pertambangan/             s.d               Pertambangan dengan CK untuk jangka waktu sampai
                            Coal Mining        2 Oktober 2027/         dengan 2 Oktober 2027 atau tercapainya volume
                             Agreement        February 14, 2020        overburden kumulatif Kelompok Usaha KIM sebesar
                                                    up to              226.000.000 BCM, yang mana tercapai terlebih dahulu/
                                               October 2, 2027         BBM has entered into a Coal Mining Service Agreement with
                                                                       CK, which shall be valid until October 2, 2027 or until KIM
                                                                       Group achieved cumulative 226,000,000 BCM Overburden,
                                                                       whichever comes first.




                                                    - 102 -
Page 109
PT GOLDEN ENERGY MINES Tbk                                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                   unless Otherwise Stated)

                                                                 Jatuh Tempo/
            Pihak/Party                Jenis/Type                  Maturities                                 Deskirpsi/Description

         CK                         Perjanjian Jasa           22 Oktober 2021 s.d         BORNEO mengadakan Perjanjian Kerjasama Jasa
                                    Pertambangan/              16 Februari 2036/          Pertambangan dengan CK untuk jangka waktu sampai
                                     Coal Mining               October 22, 2021           dengan 16 Februari 2036/
                                      Agreement                      up to                BORNEO has entered into a Coal Mining Service
                                                               February 16, 2036          Agreement with CK, which shall be valid until
                                                                                          February 16, 2036.

         CK                         Perjanjian Sewa           22 Oktober 2021 s.d         BORNEO mengadakan Perjanjian Sewa Menyewa Alat
                                     Menyewa Alat             31 Desember 2025/           Berat dengan CK untuk jangka waktu sampai dengan
                                     Berat/Heavy               October 22, 2021           31 Desember 2025/
                                   Equipment Rental                  up to                BORNEO has entered into a Heavy Equipment Rental
                                      Agreement               December 31, 2025           Agreement with CK, which shall be valid until
                                                                                          December 31, 2025.

         PT Hutan                     Perjanjian              29 Januari 2015 s.d         BORNEO menandatangani Kerjasama Perawatan dan
         Rindang Banua              Perawatan dan              17 Februari 2036/          Traffic Management Jalan di areal konsensi dengan HRB,
         (HRB)                          Traffic                January 29, 2015           dengan maksud dan tujuan untuk melakukan kerjasama
                                     Management                      up to                perawatan dan traffic management jalan sehingga dapat
                                     Jalan/Road                February 17, 2036          dilalui bersama oleh para pihak/
                                   Maintenance and                                        BORNEO entered into a Cooperation Agreements For Road
                                        Traffic                                           Maintenance and Traffic Management in HRB’s area, in
                                     Management                                           which the intent and purpose of road maintenance and traffic
                                      Agreement                                           management cooperation is such that road can be passed
                                                                                          along by the parties.

         HRB                        Perjanjian Jasa           22 Juni 2020 s.d 42         BORNEO menandatangani Perjanjian Jasa Kegiatan
                                       Kegiatan                bulan atau sampai          Rehabilitasi dan Revegetasi Daerah Aliran Sungai dengan
                                    Rehabilitasi dan                  dengan              HRB, dimana BORNEO melakukan kegiatan Rehabilitasi
                                     Revegetasi/                 diselesaikannya          dan Revegetasi Daerah Aliran Sungai seluas 1.248 Ha dan
                                   Rehabilitation and          seluruh pekerjaan,         kegiatan lain yang mendukung kegiatan rehabilitasi Daerah
                                     Revegetation                yang dibuktikan          Aliran Sungai sesuai dengan rencana kerja di Desa Kalaan,
                                       Services                       dengan              Desa Rantau Bujur, dan Desa Belangian, Kecamatan
                                      Agreement                ditandatanganinya          Aranio, Kabupaten Banjar, Kalimantan Selatan/
                                                              Berita Acara Serah          BORNEO signed Agreement of Rehabilitation and
                                                              Terima (BAST) oleh          Revegetation River Flow Area, with HRB, where BORNEO
                                                                    para pihak/           conducts the rehabilitation and revegetation of watershed,
                                                              June 22, 2020 up to         covering an area of 1,248 Hectares and other activities that
                                                               42 months or until         support rehabilitation projects in the river flow area in
                                                                the completion of         accordance with the work plan in Kalaan Village, Rantau
                                                                    work as an            Bujur Village and Belangian Village, Aranio District, Banjar,
                                                                   evidenced by           South Kalimantan.
                                                                 signing of Berita
                                                              Acara Serah Terima
                                                                  (BAST) by the
                                                                      parties

         *) Sampai dengan tanggal penyelesaian laporan keuangan, perjanjian ini masih dalam proses perpanjangan/
            As at the date of authorization of these consolidated financial statements, these agreements are still in the process of extension.



36. Tujuan dan         Kebijakan        Manajemen           Risiko           36. Financial Risk Management Objectives and
    Keuangan                                                                     Policies

   Risiko-risiko utama yang timbul dari instrumen                                    The main risks arising from the Group’s financial
   keuangan yang dimiliki Grup adalah risiko suku                                    instruments are interest rate risk, foreign exchange
   bunga, risiko nilai tukar, risiko likuiditas, dan risiko                          risk, liquidity risk and credit risk. The operational
   kredit. Kegiatan operasional Grup dijalankan secara                               activities of the Group are managed in a prudential
   berhati-hati dengan mengelola risiko-risiko tersebut                              manner by managing those risks to minimize
   agar tidak menimbulkan potensi kerugian bagi Grup.                                potential losses.

   Manajemen risiko merupakan tanggung jawab                                         Risk management is the responsibility of the Board
   Direksi. Direksi bertugas menentukan prinsip dasar                                of Directors (BOD). The BOD has the responsibility
   kebijakan manajemen risiko Grup secara                                            to determine the basic principles of the Group’s risk
   keseluruhan serta kebijakan pada area tertentu,                                   management as well as principles covering specific
   seperti risiko nilai tukar, risiko suku bunga, risiko                             areas, such as foreign exchange risk, interest rate
   kredit, dan risiko likuiditas.                                                    risk, credit risk, and liquidity risk.



                                                                     - 103 -
Page 110
PT GOLDEN ENERGY MINES Tbk                                                       PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim            Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                       As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                           March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                 (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                 unless Otherwise Stated)


   Risiko Suku Bunga                                            Interest Rate Risk

   Risiko suku bunga adalah risiko dimana nilai wajar           Interest rate risk is the risk that the fair value or
   atau arus kas kontraktual masa datang dari suatu             contractual future cash flows of a financial
   instrumen keuangan akan terpengaruh akibat                   instrument will be affected due to changes in market
   perubahan suku bunga pasar. Eksposur Grup yang               interest rates. The Group’s exposure to interest rate
   terpengaruh risiko suku bunga terutama terkait               risk relates primarily to bank loans.
   dengan pinjaman bank.

   Manajemen Grup melakukan penelaahan atas suku                Management of the Group conducts assessments
   bunga yang telah ditetapkan, apabila suku bunga              on such rates and if market interest rate decreases
   pasar turun secara signifikan, manajemen Grup                significantly, management of the Group would
   akan melakukan negosiasi untuk menurunkan suku               negotiate with creditors for reduction in interest
   bunga tersebut. Manajemen Grup juga secara terus-            rates. Management also continuously assesses
   menerus melakukan penelaahan pasar keuangan                  conditions in the financial markets for opportunities
   untuk mendapatkan sumber pendanaan yang                      to obtain optimal funding sources in terms of the
   optimal dengan suku bunga yang menguntungkan                 interest rate for the Group’s benefit.
   bagi Grup.

   Grup memiliki utang bank dengan suku bunga tetap             The Group has fixed-rate bank loans that are
   yang dicatat pada biaya perolehan diamortisasi.              carried at amortized cost. They are therefore not
   Untuk itu, pinjaman tersebut tidak termasuk dalam            subject to interest rate risk as defined
   risiko suku bunga sebagaimana didefinisikan dalam            in PSAK No. 107.
   PSAK No. 107.

   Risiko Nilai Tukar                                           Foreign Currency Risk

   Risiko nilai tukar adalah risiko dimana nilai wajar          Foreign exchange rate risk is the risk that the fair
   atau arus kas kontraktual masa datang dari suatu             value or future contractual cash flows of a financial
   instrumen keuangan akan terpengaruh akibat                   instrument will fluctuate because of changes in
   perubahan nilai tukar.                                       foreign exchange rates.

   Grup memiliki eksposur dalam mata uang asing                 The Group has transactional currency exposures.
   yang timbul dari transaksi operasionalnya. Eksposur          Such exposure arises when the transaction is
   tersebut timbul karena transaksi yang bersangkutan           denominated in currencies other than the functional
   dilakukan dalam mata uang selain mata uang                   currency of the operating unit or the counterparty.
   fungsional unit operasional atau pihak lawan.                These exposures are managed partly by using
   Sebagian dari risiko ini dikelola menggunakan                natural hedges that arise from monetary assets and
   lindung nilai alamiah yang berasal dari aset dan             liabilities in the same foreign currency.
   liabilitas moneter dalam mata uang asing yang
   sama.




                                                     - 104 -
Page 111
PT GOLDEN ENERGY MINES Tbk                                                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                  unless Otherwise Stated)


   Pada tanggal 31 Desember 2024 dan 2023, Grup                                                      As of December 31, 2024 and 2023, the Group has
   mempunyai aset dan liabilitas moneter dalam mata                                                  monetary assets and liabilities denominated in
   uang asing sebagai berikut:                                                                       foreign currencies as follows:

                                                           31 Maret 2025/March 31, 2025
                                                              (Tidak Diaudit/Unaudited )                  31 Desember 2024/December 31, 2024
                                        Mata uang      Saldo dalam                                         Saldo dalam
                                          asal/      mata uang asal/                                     mata uang asal/
                                         Original      Balance in             Ekuivalen dalam US$/         Balance in        Ekuivalen dalam US$/
                                        currency    original currency          Equivalent in US$        original currency     Equivalent in US$

    Aset                                                                                                                                             Assets
    Kas dan setara kas                    IDR         611.356.960.500                 36.855.375          394.298.334.060             24.396.630     Cash and cash equivalents
                                          SGD                  41.801                     30.828                   24.239                 17.876
    Piutang usaha                         IDR       2.266.944.909.944                136.661.738        1.946.890.148.654            120.460.966     Trade receivables
    Piutang lain-lain                     IDR          10.858.040.336                    654.572           10.852.120.358                671.459     Other receivables
    Dana yang dibatasi pencairannya       IDR         298.129.861.637                 17.972.622          238.807.320.411             14.775.852     Restricted funds
    Aset tidak lancar lainnya             IDR         178.283.162.772                 10.747.719          157.115.779.896              9.721.308     Other non-current assets

    Jumlah Aset                                                                      202.922.854                                     170.044.091     Total Assets

    Liabilitas                                                                                                                                       Liabilities
    Utang bank                            IDR         746.737.822.974                 45.016.749        2.215.166.443.860            137.060.169     Short-term bank loans
    Utang usaha                           IDR       4.033.546.506.704                243.160.508        3.035.800.082.378            187.835.669     Trade payables
    Utang lain-lain                       IDR           2.837.991.156                    171.087            6.295.034.352                389.496     Other payables
    Utang pajak                           IDR         124.399.649.088                  7.499.376           64.650.797.568              4.000.173     Taxes payable
    Beban akrual                          IDR         304.904.669.378                 18.381.039          240.286.283.780             14.867.361     Accrued expenses
    Liabilitas imbalan kerja karyawan     IDR          70.757.026.340                  4.265.555           67.187.186.000              4.157.108     Employee benefits liability

    Jumlah Liabilitas                                                                318.494.314                                     348.309.976     Total Liabilities

    Liabilitas - bersih                                                             (115.571.460)                                    (178.265.885)   Net Liabilities


   Pada tanggal 31 Maret 2025 dan 31 Desember                                                        As of March 31, 2025 and December 31, 2024, the
   2024, kurs konversi yang digunakan Grup                                                           conversion rates used by the Group were disclosed
   diungkapkan pada Catatan 2c atas laporan                                                          in Note 2c to the interim consolidated financial
   keuangan konsolidasian interim.                                                                   statements.

   Pada tanggal 31 Maret 2025, jika mata uang Rupiah                                                 As of March 31, 2025, if the Rupiah currency had
   melemah/menguat sebesar 1% terhadap Dolar                                                         weakened/strengthened by 1% against the
   Amerika Serikat (US$) dengan variabel lain konstan,                                               U.S. Dollar (US$) with all other variables held
   laba sebelum pajak untuk periode berjalan akan                                                    constant, profit before tax for the period would
   lebih tinggi/rendah sebesar US$ 1.168.552                                                         have    been      US$     1,168,552     higher/lower.
   sedangkan pada tanggal 31 Desember 2024, jika                                                     As of December 31, 2024, if the Rupiah currency
   mata uang Rupiah melemah/menguat sebesar 1%                                                       had weakened/ strengthened by 1% against the
   terhadap Dolar Amerika Serikat (US$) dengan                                                       U.S. Dollar (US$) with all other variables held
   variabel lain konstan, laba sebelum pajak untuk                                                   constant, profit before tax for the year would have
   tahun berjalan akan lebih tinggi/rendah sebesar                                                   been US$ 1,805,228, higher/lower.
   US$ 1.805.228.

   Risiko Kredit                                                                                     Credit Risk

   Risiko kredit adalah risiko bahwa Grup akan                                                       Credit risk is the risk that the Group will incur a loss
   mengalami kerugian yang timbul dari pelanggan                                                     arising from the customers or counterparties which
   atau pihak lawan akibat gagal memenuhi liabilitas                                                 fail to fulfill their contractual obligations.
   kontraktualnya. Manajemen berpendapat bahwa                                                       Management believes that there are no significant
   tidak terdapat risiko kredit yang terkonsentrasi                                                  concentrations of credit risk. The Group manages
   secara signifikan. Grup mengendalikan risiko kredit                                               and controls the credit risk by dealing only with
   dengan cara melakukan hubungan usaha dengan                                                       recognized and credit worthy parties, setting
   pihak lain yang memiliki kredibilitas, menetapkan                                                 internal policies on verifications and authorizations
   kebijakan verifikasi dan otorisasi kredit, serta                                                  of credit, and regularly monitoring the collectibility of
   memantau kolektibilitas piutang secara berkala                                                    receivables to reduce the exposure to bad debts.
   untuk mengurangi jumlah piutang tak tertagih.




                                                                                - 105 -
Page 112
PT GOLDEN ENERGY MINES Tbk                                                                            PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                 Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                            As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                     and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                      (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                      unless Otherwise Stated)


   Berikut adalah eksposur laporan posisi keuangan                                    The table below shows the consolidated
   konsolidasian yang terkait risiko kredit pada tanggal                              statements of financial position exposures
   31 Maret 2025 dan 31 Desember 2024:                                                related to credit risk as of March 31, 2025 and
                                                                                      December 31, 2024:
                                             31 Maret 2025/March 31, 2025
                                                (Tidak Diaudit/Unaudited )            31 Desember 2024/December 31, 2024
                                          Jumlah Bruto/           Jumlah Neto/         Jumlah Bruto/       Jumlah Neto/
                                         Gross Amounts            Net Amounts         Gross Amounts        Net Amounts

    Aset keuangan pada biaya perolehan
      diamortisasi                                                                                                               Financial assets at amortized cost
      Kas dan setara kas                      335.092.127            335.092.127          326.836.004            326.836.004        Cash and cash equivalents
      Piutang usaha                           220.919.985            220.919.985          202.692.042            202.692.042        Trade receivables
      Piutang lain-lain                           654.572                654.572              671.459                671.459        Other receivables
      Dana yang dibatasi pencairannya          31.116.977             31.116.977           24.659.548             24.659.548        Restricted funds
      Aset tidak lancar lainnya                10.747.719             10.747.719            9.721.308              9.721.308        Other non-current assets

    Jumlah                                    598.531.380            598.531.380          564.580.361            564.580.361     Total



   Risiko Likuiditas                                                                  Liquidity Risk

   Risiko likuiditas adalah risiko kerugian yang timbul                               Liquidity risk is a risk arising when the cash flow
   apabila Grup tidak memiliki arus kas yang cukup                                    position of the Group is not enough to cover the
   untuk memenuhi liabilitas.                                                         liabilities which become due.

   Dalam pengelolaan risiko likuiditas, manajemen                                     In the management of liquidity risk, management
   memantau dan menjaga jumlah kas dan setara kas                                     monitors and maintains a level of cash and cash
   yang dianggap memadai untuk membiayai                                              equivalents deemed adequate to finance the
   operasional Grup dan untuk mengatasi dampak                                        Group’s operations and to mitigate the effects of
   fluktuasi arus kas. Manajemen juga melakukan                                       fluctuation in cash flows. Management also
   evaluasi berkala atas proyeksi arus kas dan arus                                   regularly evaluates the projected and actual cash
   kas aktual, termasuk jadwal jatuh tempo utang.                                     flows, including loan maturity profiles. It is not
   Manajemen tidak mengharapkan bahwa arus kas                                        expected that the cash flows included in the maturity
   dalam analisa jatuh tempo tersebut terjadi jauh lebih                              analysis could occur significantly earlier, or at
   awal, atau dalam jumlah yang berbeda secara                                        significantly different amounts.
   signifikan.

   Berikut adalah jadwal jatuh tempo liabilitas                                       The table below summarizes the maturity profile
   keuangan konsolidasian berdasarkan pembayaran                                      of    consolidated  financial liabilities based
   kontraktual yang tidak didiskontokan (tidak termasuk                               on contractual undiscounted payments (excluding
   pembayaran bunga) pada tanggal 31 Maret 2025                                       interest payments) as of March 31, 2025 and
   dan 31 Desember 2024:                                                              December 31, 2024:

                                           Sewaktu-waktu dan
                                          Dalam Waktu 1 Tahun/ Dalam Waktu 1 sampai
                                             On Demand and        dengan 5 Tahun/
                                              Within 1 Year     Within 1 to 5 Years                     Jumlah/Total

    31 Maret 2025 (Tidak Diaudit)                                                                                              March 31, 2025 (Unaudited)
    Utang bank jangka pendek                        135.016.748                             -               135.016.748        Short-term bank loans
    Utang usaha                                     277.008.165                             -               277.008.165        Trade payables
    Utang lain-lain                                     171.087                             -                   171.087        Other payables
    Beban akrual                                     19.251.476                             -                19.251.476        Accrued expenses
    Utang bank jangka panjang                        10.000.000                    27.500.000                37.500.000        Long-term bank loan
    Sewa pembiayaan                                     221.494                       306.491                   527.985        Lease liabilities
    Jumlah                                          441.668.970                    27.806.491               469.475.461        Total

    31 Desember 2024                                                                                                           December 31, 2024
    Utang bank jangka pendek                        242.060.169                             -               242.060.169        Short-term bank loans
    Utang usaha                                     247.993.628                             -               247.993.628        Trade payables
    Utang lain-lain                                     389.496                             -                   389.496        Other payables
    Beban akrual                                     16.345.798                             -                16.345.798        Accrued expenses
    Utang bank jangka panjang                        10.000.000                    30.000.000                40.000.000        Long-term bank loan
    Sewa pembiayaan                                     240.256                       326.601                   566.857        Lease liabilities
    Jumlah                                          517.029.347                    30.326.601               547.355.948        Total




                                                                      - 106 -
Page 113
PT GOLDEN ENERGY MINES Tbk                                                      PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                          AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim           Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                      As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                               and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                          March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                unless Otherwise Stated)


37. Perjanjian Penting, Komitmen dan Kontinjensi          37. Significant Agreements,             Commitments             and
                                                              Contingencies

                                                       Jatuh Tempo/
       Pihak/Party           Jenis/Type                  Maturities                      Deskripsi/Description

     Pemerintah                Royalti/                 Berdasarkan         Pada tanggal 31 Maret 2025 dan 31 Desember
     Republik                  Royalty             ketentuan Perjanjian     2024, uang muka atas iuran DHPB yang sudah
     Indonesia/                                           kerjasama         dibayar masing-masing sebesar US$ 7.951.980
     The Government                                      Pengusaha          dan US$ 4.342.548 disajikan sebagai bagian dari
     of the Republic of                                Pertambangan         akun “Uang muka dan biaya dibayar dimuka” pada
     Indonesia                                       Batubara (PKP2B),      laporan posisi keuangan konsolidasian (Catatan
                                                   Borneo berkewajiban      8) dan iuran DHPB yang masih harus dibayar
                                                       untuk membagi        masing-masing sebesar US$ 760.327 dan
                                                    13,5% dari produksi     US$ 1.243.408, disajikan sebagai bagian dari
                                                      batubara kepada       akun “Beban akrual” pada laporan posisi
                                                   Pemerintah Republik      keuangan konsolidasian (Catatan 16). Beban
                                                          Indonesia/        iuran DHPB untuk periode tiga bulan yang berakhir
                                                       Based on Coal        pada tanggal 31 Maret 2025 dan 2024 masing-
                                                      Contract of Work      masing     sebesar     US$     83.232.983      dan
                                                     (CCoW), Borneo is      US$ 89.406.314, disajikan sebagai bagian dari
                                                    required to share its   akun “Beban pokok penjualan” pada laporan laba
                                                        13,5% of coal       rugi dan penghasilan komprehensif lain
                                                       produced to the      konsolidasian (Catatan 26)/
                                                     Government of the      As of March 31, 2025 and December 31, 2024,
                                                   Republic of Indonesia    advance royalty amounted to US$ 7,951,980 and
                                                                            US$ 4,342,548, respectively, presented as part of
                                                                            “Advances and prepaid expenses” in the
                                                                            consolidated statement of financial position
                                                                            (Note 8) and accrued royalty fee amounted to
                                                                            US$ 760,327 and US$ 1,243,408, respectively,
                                                                            presented as part of “Accrued expenses” account
                                                                            in the consolidated statement of financial position
                                                                            (Note 16). Royalty fee expenses for the three-
                                                                            month period ended March 31, 2025 and 2024
                                                                            amounted       to    US$      83,232,983       dan
                                                                            US$ 89,406,314, respectively, presented as part of
                                                                            “Cost of revenues“ account in the consolidated
                                                                            statement of profit or loss and other
                                                                            comprehensive income (Note 26).

     BORNEO
     Pemerintah              Iuran Tetap/           BORNEO diwajibkan       Beban deadrent untuk periode tiga bulan yang
     Republik                  Deadrent                untuk membayar       berakhir pada 31 Maret 2025 dan 2024 masing-
     Indonesia/                                       iuran tetap kepada    masing sebesar US$ 27.125 dan US$ 79.508,
     The Government                                 Pemerintah Republik     disajikan sebagai bagian dari akun “Beban umum
     of the Republic of                                     Indonesia       dan administrasi - Lain-lain” pada laporan laba rugi
     Indonesia                                       berdasarkan 24.100     dan penghasilan komprehensif lain konsolidasian
                                                      Ha sesuai dengan      (Catatan 28)/
                                                    tarif yang ditetapkan   Deadrent for the three-month period ended
                                                        dalam PKP2B/        March 31, 2025 and 2024 amounting to
                                                    BORNEO is required      US$ 27,125 and US$ 79,508, respectively,
                                                    to pay fixed payment    presented as part of “General and administrative
                                                       of the Republic of   expenses - Others” account in the consolidated
                                                     Indonesia based on     statement of profit or loss and other
                                                         24,100 Ha, in      comprehensive income (Note 28).
                                                     accordance with the
                                                      rates on CCoW as
                                                       stipulated therein




                                                   - 107 -
Page 114
PT GOLDEN ENERGY MINES Tbk                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                  unless Otherwise Stated)

                                                        Jatuh Tempo/
      Pihak/Party             Jenis/Type                  Maturities                        Deskripsi/Description

    PT Kirana         Perjanjian Penggarapan Lahan   6 Maret 2013 sampai       Pada tanggal 31 Maret 2025 dan 31 Desember
    Chatulistiwa      Pertambangan Batubara/Land       dengan BORNEO           2024, saldo uang jaminan reklamasi sebesar
    (KC)                  Exploitation Agreement       selesai melakukan       Rp 11.000.000.000 (masing-masing setara
                                                             kegiatan          dengan US$ 663.130 dan US$ 680.609), disajikan
                                                     penambangan di area       sebagai bagian dalam akun “Aset tidak lancar
                                                             tersebut/         lainnya - Uang jaminan - Reklamasi” pada laporan
                                                      March 6, 2013 until      posisi keuangan konsolidasian (Catatan 13)/
                                                       BORNEO's mining         As of March 31, 2025 and December 31, 2024,
                                                      activities in the area   guarantee deposits for reclamation amounted to
                                                         are completed         Rp 11,000,000,000 (equivalent to US$ 663,130
                                                                               and US$ 680,609), respectively, which is
                                                                               presented as part of “Other non-current assets -
                                                                               Guarantee deposits - Reclamation” account in the
                                                                               consolidated statement of financial position
                                                                               (Note 13).

    PT Gerak Bangun   Perjanjian Penggarapan Lahan    19 Juli 2011 sampai      Perjanjian ini dibuat sehubungan dengan kegiatan
    Utama             Pertambangan Batubara/Land       dengan BORNEO           penambangan BORNEO di area yang terdapat
    (GBU)                 Exploitation Agreement       selesai melakukan       Hak Pengusahaan Hutan Tanaman Industri
                                                             kegiatan          (HPHTI) milik pihak ketiga lainnya. BORNEO
                                                     penambangan di area       diharuskan membayar fee sebesar US$ 0,25 per
                                                             tersebut/         mt batubara yang diproduksi pada areal tumpang
                                                       July 19, 2011 until     tindih dan menyetorkan uang jaminan sebesar
                                                       BORNEO's mining         Rp 23.800.000.000 (masing-masing setara
                                                      activities in the area   dengan US$ 1.434.772 dan US$ 1.472.590 pada
                                                         are completed         tanggal 31 Maret 2025 dan 31 Desember 2024),
                                                                               disajikan sebagai bagian dari akun “Aset tidak
                                                                               lancar lainnya - Uang jaminan - Kerusakan lahan”
                                                                               pada laporan posisi keuangan konsolidasian
                                                                               (Catatan 13)/
                                                                               This agreement has been made in relation with
                                                                               BORNEO’s mining activities in the area in which
                                                                               Industrial Forest Concession Rights (HPHTI) are
                                                                               owned by other third party. BORNEO is obliged to
                                                                               pay US$ 0.25 per mt of coal produced from the
                                                                               overlap area and transfer a guarantee deposit of
                                                                               Rp 23,800,000,000 (equivalent to US$ 1,434,772
                                                                               and US$ 1,472,590 as of March 31, 2025 and
                                                                               December 31, 2024), respectively, which is
                                                                               presented as part of “Other non-current assets -
                                                                               Guarantee deposits - Land damage” account in the
                                                                               consolidated statement of financial position
                                                                               (Note 13).

    PT Alam Unda         Perjanjian Kerjasama        8 Juni 2007 s.d 8 Juni    BORNEO mengadakan Perjanjian Kerjasama
                        Pengelolaan Jalan/Road       2032/June 8, 2007 up      Operasional Pengelolaan Jalan PT Alam Unda
                        Maintenance Cooperation         to June 8, 2032        sepanjang 21 km di Kecamatan Satui, Kabupaten
                              Agreement                                        Kotabaru, Kalimantan Selatan. Pada tanggal
                                                                               31 Maret 2025 dan 31 Desember 2024, saldo uang
                                                                               jaminan sebesar Rp 2.300.000.000 (masing-
                                                                               masing setara dengan US$ 138.654 dan
                                                                               US$ 142.309), disajikan sebagai bagian dalam
                                                                               akun “Aset tidak lancar lainnya - Uang jaminan -
                                                                               Pengelolaan jalan” pada laporan posisi keuangan
                                                                               konsolidasian
                                                                               (Catatan 13)/
                                                                               BORNEO entered into a Road Maintenance
                                                                               Cooperation Agreement with PT Alam Unda
                                                                               covering a land road for 21 km at Satui Subdistrict,
                                                                               Kotabaru District, South Kalimantan. As of
                                                                               March 31, 2025 and December 31, 2024, the
                                                                               balance of guarantee deposit amounting to
                                                                               Rp 2,300,000,000 (equivalent to US$ 138,654 and
                                                                               US$ 142,309), respectively, presented as part of
                                                                               “Other non-current assets - Guarantee deposits -
                                                                               Road maintenance” account in the consolidated
                                                                               statements of financial position (Note 13).




                                                     - 108 -
Page 115
PT GOLDEN ENERGY MINES Tbk                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                   unless Otherwise Stated)

                                                          Jatuh Tempo/
      Pihak/Party               Jenis/Type                  Maturities                      Deskripsi/Description

    PT Kalimantan       Perjanjian Penambangan dan        27 Mei 2019 s.d      BORNEO mengadakan Perjanjian Pekerjaan Jasa
    Mitra Maju          Pengangkutan Batubara/Coal      31 Desember 2025/      Pertambangan Pengupasan Tanah Penutup
    Bersama            Mining and Hauling Agreements    May 27, 2019 up to     dengan KMMB           sebagai kontraktor jasa
    (KMMB)                                              December 31, 2025      pertambangan di Batulaki KM 21/
                                                                               BORNEO entered into an Overburden Removal
                                                                               Contract with KMMB as a mining service
                                                                               contractor at Batulaki KM 21.

    PT Energi Sinar     Perjanjian Penambangan dan        7 April 2021 s.d     BORNEO mengadakan Kontrak Pekerjaan Jasa
    Tambang             Pengangkutan Batubara/Coal      31 Desember 2025/      Pertambangan Pengupasan Lapisan Tanah
    (EST)              Mining and Hauling Agreements     April 7, 2021 up to   Penutup dengan EST sebagai kontraktor jasa
                                                        December 31, 2025      pertambangan di proyek Mangkalapi/
                                                                               BORNEO entered into an Overburden Mining
                                                                               Services Contract with EST as a mining service
                                                                               contractor at Mangkalapi Project.

    KMMB                Perjanjian Penambangan dan        7 April 2022 s.d     BORNEO mengadakan Kontrak Jasa Penggalian
                        Pengangkutan Batubara/Coal      31 Desember 2025/      Batubara dengan KMMB sebagai kontraktor jasa
                       Mining and Hauling Agreements     April 7, 2022 up to   penggalian batubara/
                                                        December 31, 2025      BORNEO entered into a Coal Getting Contract
                                                                               with KMMB as a coal getting contractor.

    EST                 Perjanjian Penambangan dan        7 April 2021 s.d     BORNEO mengadakan Kontrak Jasa Penggalian
                        Pengangkutan Batubara/Coal      31 Desember 2025/      Batubara dengan EST sebagai kontraktor jasa
                       Mining and Hauling Agreements     April 7, 2021 up to   penggalian batubara/
                                                        December 31, 2025      BORNEO entered into a Coal Getting Contract
                                                                               with EST as a coal getting contractor.

    PT Putra Perkasa    Perjanjian Penambangan dan        1 Juli 2022 s.d      BORNEO mengadakan Kontrak Jasa Penggalian
    Abadi               Pengangkutan Batubara/Coal      31 Desember 2030/      Batubara dengan PPA sebagai kontraktor jasa
    (PPA)              Mining and Hauling Agreements     July 1, 2022 up to    pertambangan di Proyek Girimulya untuk jangka
                                                        December 31, 2030      waktu sampai dengan 31 Desember 2030/
                                                                               BORNEO entered into a Coal Getting Contract
                                                                               with PPA as a mining service contractor in
                                                                               Girimulya  Project   for   a    period    until
                                                                               December 31, 2030.

    PPA                Perjanjian Sewa Menyewa Alat     26 Januari 2015 s.d    BORNEO menyewa peralatan untuk melakukan
                       Berat/Rental Heavy Equipment     31 Desember 2030/      kegiatan pertambangan yang secara khusus tidak
                                 Agreement               January 26, 2015      dilakukan oleh perusahaan jasa pertambangan di
                                                               up to           Proyek Girimulya/
                                                        December 31, 2030      BORNEO rents equipment to conduct mining
                                                                               activities that are not specifically carried out by
                                                                               mining service company in Girimulya Project.

    BSL
    PT Kalidareh         Perjanjian Pengangkutan        7 Februari 2018 s.d    KPM akan menyediakan jasa pengangkutan
    Prima Mandiri                Batubara/                6 Februari 2026/     batubara kepada BSL dengan beban untuk jarak
    (KPM)                Coal Hauling Agreements        February 7, 2018 up    dari tambang batubara dan/atau stockpile kepada
                                                        to February 6, 2026    Pelabuhan SBL/
                                                                               KPM will provide coal hauling services to BSL with
                                                                               charge for distance from mine site and/or stockpile
                                                                               to SBL Port.

    PT Waletindo         Perjanjian Pengangkutan        7 Februari 2018 s.d    WSP akan menyediakan jasa pengangkutan
    Setia Persada                Batubara/                6 Februari 2026/     batubara kepada BSL dengan beban untuk jarak
    (WSP)                Coal Hauling Agreements        February 7, 2018 up    dari tambang batubara dan/atau stockpile kepada
                                                        to February 6, 2026    Pelabuhan SBL dan/atau pelabuhan yang ditunjuk
                                                                               BSL/
                                                                               WSP will provide coal hauling services to BSL with
                                                                               charge for distance from mine site and/or stockpile
                                                                               to SBL Port and/or BSL’s selected port.




                                                       - 109 -
Page 116
PT GOLDEN ENERGY MINES Tbk                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                   unless Otherwise Stated)

                                                          Jatuh Tempo/
      Pihak/Party               Jenis/Type                  Maturities                       Deskripsi/Description

    PT Lobunta         Perjanjian Penambangan dan        19 Juni 2017 s.d      LKR akan menyediakan jasa pertambangan yang
    Kencana Raya         Pengangkutan Batubara/            18 Juni 2025/       terdiri dari pembukaan lahan dan pemindahan
    (LKR)                Coal Mining and Hauling        June 19, 2017 up to    overburden pada lapisan batubara dengan
                                Agreements                June 18, 2025        berbagai ketebalan dan batubara akan dimuat dan
                                                                               diangkut dari lokasi tambang ke stockpile BSL/
                                                                               LKR will provide mining services consisting of land
                                                                               clearing and overburden removal in coal seams of
                                                                               various thicknesses and coal will be loaded and
                                                                               transported from the mine site to the BSL’s
                                                                               stockpile.

    PT Trasindo          Perjanjian Pengangkutan          27 Juli 2020 s.d     TMS akan menyediakan jasa pengangkutan
    Makmur                       Batubara/              30 September 2025/     batubara kepada BSL dari tambang batubara BSL
    Sejahtera            Coal Hauling Agreements         July 27, 2020 up to   dan/atau stockpile menuju pelabuhan PT Sriwijaya
    (TMS)                                               September 30, 2025     Bara Logistic/
                                                                               TMS will provide coal hauling services to BSL from
                                                                               mine site and/or stockpile to PT Sriwijaya Bara
                                                                               Logistic’s port.

    PT Sarana            Perjanjian Pengangkutan       7 Desember 2020 s.d     SPE akan menyediakan jasa pengangkutan
    Perkasa Erasindo             Batubara/              4 November 2025/       batubara kepada BSL dari tambang batubara BSL
    (SPE)                Coal Hauling Agreements       December 7, 2020 up     dan/atau stockpile menuju pelabuhan PT Sriwijaya
                                                       to November 4, 2025     Bara Logistic/
                                                                               SPE will provide coal hauling services to BSL from
                                                                               mine site and/or stockpile to PT Sriwijaya Bara
                                                                               Logistic’s port.

    PT Tri Putra         Perjanjian Pengangkutan        31 Desember 2020       TPE akan menyediakan jasa pengangkutan
    Erguna                       Batubara/               s.d 30 November       batubara kepada BSL dari tambang batubara
    (TPE)                Coal Hauling Agreements               2026/           menuju ROM stockpile Mekarsari/
                                                        December 31, 2020      TPE will provide coal hauling services to BSL from
                                                        up to November 30,     mine site to ROM stockpile Mekarsari.
                                                               2026

    TPE                 Perjanjian Jasa Penggalian        1 Januari 2024       BSL mengadakan Perjanjian Jasa Penggalian
                          Batubara/Coal Mining           s.d 30 Juni 2027/     Batubara dengan TPE/
                                 Agreement                January 1, 2024      BSL enters into Coal Mining Service Agreement
                                                        Up to June 30, 2027    with TPE.

    PT Meganusa          Perjanjian Perawatan Coal      16 Oktober 2021 s.d    BSL sepakat untuk membeli dan MT sepakat untuk
    Transmission       Crushing Plant/Maintenance of     15 Oktober 2027/      menjual dan melakukan fabrikasi, pembangunan,
    (MT)               Coal Crushing Plant Agreement    October 16, 2021 up    dan pemasangan crusher serta fasilitas
                                                        to October 15, 2027    pendukungnya di Kabupaten Musi Rawas Utara,
                                                                               Musi Rawas dan Musi Banyuasin, Provinsi
                                                                               Sumatera Selatan/
                                                                               BSL agreed to purchase and MT agreed to sell and
                                                                               perform fabrication, construction, and installation
                                                                               of crusher as well as its supporting facilities in Musi
                                                                               Rawas Utara, Musi Rawas and Musi Banyuasin
                                                                               Regency, South Sumatera Province.

    KIM
    TMS                  Perjanjian Pengangkutan        21 Januari 2014 s.d    TMS akan menyediakan jasa pengangkutan
                          Batubara/Coal Hauling         31 Desember 2025/      batubara kepada KIM setiap hari dari tambang
                               Agreements               January 21, 2014 up    dan/atau stockpile Bungo menuju ke beberapa
                                                       to December 31, 2025    stockpile, yaitu stockpile Perawang, stockpile
                                                                               Tebing Tinggi dan stockpile Padang/
                                                                               TMS will provide coal hauling services to KIM
                                                                               every day from the Bungo’s mine site and/or
                                                                               stockpile to several stockpiles such as Perawang’s
                                                                               stockpile, Tebing Tinggi’s stockpile and Padang‘s
                                                                               stockpile.




                                                       - 110 -
Page 117
PT GOLDEN ENERGY MINES Tbk                                                    PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim         Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                    As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                             and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                        March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,              (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                              unless Otherwise Stated)

                                                      Jatuh Tempo/
      Pihak/Party             Jenis/Type                Maturities                     Deskripsi/Description

    PT Mayor Prima      Perjanjian Pengangkutan    5 Januari 2016 s.d     MPA akan menyediakan jasa pengangkutan
    Abadi                Batubara/Coal Hauling    31 Desember 2024 *)/    batubara kepada KIM setiap hari dari tambang
    (MPA)                     Agreements          January 5, 2016 up to   dan/atau stockpile Bungo menuju ke beberapa
                                                  December 31, 2024 *)    stockpile, yaitu stockpile Perawang, stockpile
                                                                          Tebing Tinggi dan stockpile Integra/
                                                                          MPA will provide coal hauling services to KIM
                                                                          every day from the Bungo’s mine site and/or
                                                                          stockpile to several stockpiles such as Perawang’s
                                                                          stockpile, Tebing Tinggi’s stockpile and Integra’s
                                                                          stockpile.

    SPE                 Perjanjian Pengangkutan     5 Januari 2016 s.d    SPE akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/      batubara kepada KIM setiap hari dari tambang
                              Agreements          January 5, 2016 up to   dan/atau stockpile Bungo menuju ke beberapa
                                                   December 31, 2025      stockpile, yaitu stockpile Perawang, stockpile
                                                                          Tebing Tinggi dan stockpile Integra/
                                                                          SPE will provide coal hauling services to KIM
                                                                          every day from the Bungo’s mine site and/or
                                                                          stockpile to several stockpiles such as Perawang’s
                                                                          stockpile, Tebing Tinggi’s stockpile and Integra’s
                                                                          stockpile.

    WSP                 Perjanjian Pengangkutan     5 Januari 2016 s.d    WSP akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/      batubara kepada KIM setiap hari dari tambang
                              Agreements          January 5, 2016 up to   dan/atau stockpile Bungo menuju ke beberapa
                                                   December 31, 2025      stockpile, yaitu stockpile Perawang, stockpile
                                                                          Tebing Tinggi dan stockpile Integra/
                                                                          WSP will provide coal hauling services to KIM
                                                                          every day from the Bungo’s mine site and/or
                                                                          stockpile to several stockpiles such as Perawang’s
                                                                          stockpile, Tebing Tinggi’s stockpile and Integra’s
                                                                          stockpile.

    KPM                 Perjanjian Pengangkutan     2 Agustus 2017 s.d    KPM akan menyediakan jasa pengangkutan
                                Batubara/          31 Desember 2025/      batubara kepada KIM setiap hari dari tambang
                        Coal Hauling Agreements    August 2, 2017 up to   dan/atau stockpile Bungo menuju ke beberapa
                                                   December 31, 2025      stockpile, yaitu stockpile Perawang dan stockpile
                                                                          Tebing Tinggi/
                                                                          KPM will provide coal hauling services to KIM
                                                                          every day from the Bungo’s mine site and/or
                                                                          stockpile to several stockpiles such as Perawang’s
                                                                          stockpile and Tebing Tinggi’s stockpile.

    BBU
    TMS                 Perjanjian Pengangkutan      11 Juli 2017 s.d     TMS akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/      batubara kepada BBU setiap hari dari tambang
                              Agreements           July 11, 2017 up to    dan/atau stockpile Bungo menuju ke beberapa
                                                   December 31, 2025      stockpile, yaitu stockpile Perawang dan stockpile
                                                                          Tebing Tinggi/
                                                                          TMS will provide coal hauling services to BBU
                                                                          every day from the Bungo’s mine site and/or
                                                                          stockpile to several stockpiles such as Perawang’s
                                                                          stockpile and Tebing Tinggi’s stockpile.

    MPA                 Perjanjian Pengangkutan      11 Juli 2017 s.d     MPA akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling    31 Desember 2024 *)/    batubara kepada BBU setiap hari dari tambang
                              Agreements           July 11, 2017 up to    dan/atau stockpile Bungo menuju ke beberapa
                                                  December 31, 2024 *)    stockpile, yaitu stockpile Perawang dan stockpile
                                                                          Tebing Tinggi/
                                                                          MPA will provide coal hauling services to BBU
                                                                          every day from the Bungo’s mine site and/or
                                                                          stockpile to several stockpiles such as Perawang’s
                                                                          stockpile and Tebing Tinggi’s stockpile.




                                                  - 111 -
Page 118
PT GOLDEN ENERGY MINES Tbk                                                    PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                        AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim         Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                    As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                             and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                        March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,              (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                              unless Otherwise Stated)

                                                      Jatuh Tempo/
      Pihak/Party             Jenis/Type                Maturities                    Deskripsi/Description

    SPE                 Perjanjian Pengangkutan      11 Juli 2017 s.d    SPE akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/     batubara kepada BBU setiap hari dari tambang
                              Agreements           July 11, 2017 up to   dan/atau stockpile Bungo menuju ke beberapa
                                                   December 31, 2025     stockpile, yaitu stockpile Perawang dan stockpile
                                                                         Tebing Tinggi/
                                                                         SPE will provide coal hauling services to BBU
                                                                         every day from the Bungo mine site and/or
                                                                         stockpile to several stockpiles such as Perawang’s
                                                                         stockpile and Tebing Tinggi’s stockpile.

    WSP                 Perjanjian Pengangkutan      11 Juli 2017 s.d    WSP akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/     batubara kepada BBU setiap hari dari tambang
                              Agreements           July 11, 2017 up to   dan/atau stockpile Bungo menuju ke beberapa
                                                   December 31, 2025     stockpile, yaitu stockpile Perawang dan stockpile
                                                                         Tebing Tinggi/
                                                                         WSP will provide coal hauling services to BBU
                                                                         every day from the Bungo’s mine site and/or
                                                                         stockpile to several stockpiles such as Perawang’s
                                                                         stockpile and Tebing Tinggi’s stockpile.

    KPM                 Perjanjian Pengangkutan      11 Juli 2017 s.d    KPM akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/     batubara kepada BBU setiap hari dari tambang
                              Agreements           July 11, 2017 up to   dan/atau stockpile Bungo menuju ke beberapa
                                                   December 31, 2025     stockpile, yaitu stockpile Perawang dan stockpile
                                                                         Tebing Tinggi/
                                                                         KPM will provide coal hauling services to BBU
                                                                         every day from the Bungo’s mine site and/or
                                                                         stockpile to several stockpiles such as Perawang’s
                                                                         stockpile and Tebing Tinggi’s stockpile.

    BBM
    TMS                 Perjanjian Pengangkutan    28 Oktober 2019 s.d   TMS akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/     batubara kepada BBM setiap hari dari tambang
                              Agreements           October 28, 2019 up   dan/atau stockpile Bungo menuju ke beberapa
                                                  to December 31, 2025   stockpile, yaitu stockpile Perawang dan stockpile
                                                                         Tebing Tinggi/
                                                                         TMS will provide coal hauling services to BBM
                                                                         every day from the Bungo’s mine site and/or
                                                                         stockpile to several stockpiles such as Perawang’s
                                                                         stockpile and Tebing Tinggi’s stockpile.

    MPA                 Perjanjian Pengangkutan    28 Oktober 2019 s.d   MPA akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling    31 Desember 2024 *)/   batubara kepada BBM setiap hari dari tambang
                              Agreements            October 28, 2019     dan/atau stockpile Bungo menuju ke beberapa
                                                   up to December 31,    stockpile, yaitu stockpile Perawang dan stockpile
                                                         2024 *)         Tebing Tinggi/
                                                                         MPA will provide coal hauling services to BBM
                                                                         every day from the Bungo’s mine site and/or
                                                                         stockpile to several stockpiles such as Perawang’s
                                                                         stockpile and Tebing Tinggi’s stockpile.

    SPE                 Perjanjian Pengangkutan    28 Oktober 2019 s.d   SPE akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/     batubara kepada BBM setiap hari dari tambang
                              Agreements           October 28, 2019 up   dan/atau stockpile Bungo menuju ke beberapa
                                                  to December 31, 2025   stockpile, yaitu stockpile Perawang dan stockpile
                                                                         Tebing Tinggi/
                                                                         SPE will provide coal hauling services to BBM
                                                                         every day from the Bungo’s mine site and/or
                                                                         stockpile to several stockpiles such as Perawang’s
                                                                         stockpile and Tebing Tinggi’s stockpile.

    WSP                 Perjanjian Pengangkutan    28 Oktober 2019 s.d   WSP akan menyediakan jasa pengangkutan
                         Batubara/Coal Hauling     31 Desember 2025/     batubara kepada BBM setiap hari dari tambang
                              Agreements           October 28, 2019 up   dan/atau stockpile Bungo menuju ke beberapa
                                                  to December 31, 2025   stockpile, yaitu stockpile Perawang dan stockpile
                                                                         Tebing Tinggi/
                                                                         WSP will provide coal hauling services to BBM
                                                                         every day from the Bungo’s mine site and/or
                                                                         stockpile to several stockpiles such as Perawang’s
                                                                         stockpile and Tebing Tinggi’s stockpile.




                                                  - 112 -
Page 119
PT GOLDEN ENERGY MINES Tbk                                                                           PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                               AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                           As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                    and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                               March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                     (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                     unless Otherwise Stated)

                                                                           Jatuh Tempo/
         Pihak/Party                     Jenis/Type                          Maturities                            Deskripsi/Description

    KPM                           Perjanjian Pengangkutan               28 Oktober 2019 s.d           KPM akan menyediakan jasa pengangkutan
                                   Batubara/Coal Hauling                31 Desember 2025/             batubara kepada BBM setiap hari dari tambang
                                        Agreements                      October 28, 2019 up           dan/atau stockpile Bungo menuju ke beberapa
                                                                       to December 31, 2025           stockpile, yaitu stockpile Perawang dan stockpile
                                                                                                      Tebing Tinggi/
                                                                                                      KPM will provide coal hauling services to BBM
                                                                                                      every day from the Bungo’s mine site and/or
                                                                                                      stockpile to several stockpiles such as Perawang’s
                                                                                                      stockpile and Tebing Tinggi’s stockpile.

    TKS
    PT Trinity Mine             Perjanjian Penambangan dan              9 Desember 2009 s.d           TKS mengadakan Perjanjian Penambangan
    Resources                   Pengangkutan Batubara/Coal               7 Desember 2025/             Batubara dengan TMR, pihak ketiga. Jangka
    (TMR)                      Mining and Hauling Agreements             December 9, 2009             waktu kontrak adalah 5 tahun sejak dimulainya
                                                                         up to December 7,            pekerjaan sesuai Surat Perintah Kerja atau
                                                                                2025                  sampai tercapainya jumlah produksi sebesar
                                                                                                      1.800.000 MT, mana yang lebih dahulu terjadi/
                                                                                                      TKS entered into a Coal Mining Agreement with
                                                                                                      TMR, a third party. The term of the contract is 5
                                                                                                      years starting from the time the work begins based
                                                                                                      on Work Instruction Letter or up to production of
                                                                                                      1,800,000 MT, whichever comes first.

    PT Alam Karunia               Perjanjian Jasa Bantuan               13 April 2012 sampai          TKS setuju untuk memberikan uang muka jasa
    Mineral                       Manajemen/Management                    dengan habisnya             bantuan manajemen sebesar Rp 5.000.000.000
    (AKM)                       Assistance Service Agreement            kandungan batubara            atau setara masing-masing dengan US$ 301.423
                                                                       yang dapat ditambang           dan US$ 309.368 pada tanggal 31 Maret 2025 dan
                                                                           dan dijual secara          31 Desember 2024, yang disajikan sebagai bagian
                                                                           ekonomis di area           dari akun “Uang muka dan biaya dibayar di muka
                                                                       tambang, atau sampai           - Uang muka - Jasa bantuan manajemen” pada
                                                                         dengan berakhirnya           laporan     posisi    keuangan     konsolidasian
                                                                           IUP Perusahaan/            (Catatan 8)/
                                                                          April 13, 2012 until        TKS agreed to pay a management assistance
                                                                            the economical            service advance amounting to Rp 5,000,000,000
                                                                             mineable and             or equivalent to US$ 301,423 and US$ 309.368 as
                                                                        saleable coal reserve         of March 31, 2025 and December 31, 2024,
                                                                             in the area is           respectively, which was recorded as part of
                                                                               completely             “Advances and prepaid expenses - Advances -
                                                                       consumed, or until the         Management assistance services” account in the
                                                                       end of the Company’s           consolidated statement of financial position
                                                                              IUP is over.            (Note 8).

    *)    Sampai dengan tanggal penyelesaian laporan keuangan, perjanjian ini masih dalam proses perpanjangan/
          As at the date of authorization of these consolidated financial statements, these agreements are still in the process of extension.




                                                                       - 113 -
Page 120
PT GOLDEN ENERGY MINES Tbk                                                                                             PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                 AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                  Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                             As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                      and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                 March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                       (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                       unless Otherwise Stated)


38. Informasi Segmen                                                                           38. Segment Information

   Informasi mengenai segmen usaha Grup adalah                                                           Information concerning the Group’s business
   sebagai berikut:                                                                                      segments are as follows:

                                                                                     Tiga bulan/Three months
                                                                                  31 Maret 2025/March 31, 2025
                                                                                    (Tidak Diaudit/Unaudited )
                                                Pertambangan       Perdagangan
                                                  batubara/         batubara/               Lain-lain/            Eliminasi/        Jumlah/
                                                 Coal mining       Coal trading              Others              Elimination         Total

    Penjualan neto                                                                                                                                  Revenues
       Ekspor                                      401.153.541             14.544                        -                     -    401.168.085        Export
       Lokal                                       242.843.082          4.327.972                        -                     -    247.171.054        Local

    Jumlah                                         643.996.623          4.342.516                        -                     -    648.339.139     Total

    Beban pokok penjualan                          (394.638.830)       (4.197.059)                (13.259)                     -    (398.849.148)   Cost of revenues

    Laba bruto                                     249.357.793            145.457                 (13.259)                     -    249.489.991     Gross profit


    Beban penjualan dan Beban                                                                                                                       Selling expenses and General
       umum administrasi                           (102.038.816)         (154.713)             (1.776.454)                    -     (103.969.983)       and administrative expenses
    Beban eksplorasi                                   (670.248)                -                       -                     -         (670.248)   Exploration expense
    Pendapatan bunga                                  1.285.856            73.126               1.896.885            (1.061.557)       2.194.310    Interest income
    Beban keuangan lainnya                           (1.148.000)                -                       -                     -       (1.148.000)   Other financial charges
    Beban bunga                                      (2.293.726)          (12.421)               (190.655)            1.061.557       (1.435.245)   Interest expense
    Pendapatan (beban) lain-lain - bersih             2.874.776            35.548                (518.898)              (30.307)       2.361.119    Other income (expense) - net

    Laba sebelum pajak                             147.367.635             86.997                (602.381)              (30.307)    146.821.944     Profit before tax

    Beban (penghasilan) pajak                       (32.567.485)           (5.630)                 11.227                 6.233      (32.555.655)   Tax expense (benefit)

    Laba periode berjalan                          114.800.150             81.367                (591.154)              (24.074)    114.266.289     Profit for the period

    Aset segmen                                   1.068.819.332        14.912.802          1.174.052.381          (968.203.802)    1.289.580.713    Segment assets

    Liabilitas segmen                              554.017.650          3.996.421             12.407.599           (56.479.530)     513.942.140     Segment liabilities

    Pengungkapan tambahan                                                                                                                           Additional disclosures
       Perolehan barang modal                         3.246.880             3.428                        -                     -       3.250.308       Capital expenditures

       Depresiasi dan amortisasi                      7.614.917              355                   89.098                30.308        7.734.678       Depreciation and amortization

       Penjualan berdasarkan lokasi geografis                                                                                                          Sales based on geographical location
          Cina                                     278.801.049             14.544                        -                     -    278.815.593           China
          Indonesia                                242.843.082          4.327.972                        -                     -    247.171.054           Indonesia
          India                                     67.782.267                  -                        -                     -     67.782.267           India
          Filipina                                  22.263.258                  -                        -                     -     22.263.258           Philippines
          Korea Selatan                             18.894.820                  -                        -                     -     18.894.820           South Korea
          Vietnam                                    7.254.240                  -                        -                     -      7.254.240           Vietnam
          Hong Kong                                  4.318.856                  -                        -                     -      4.318.856           Hong Kong
          Malaysia                                   1.839.051                  -                        -                     -      1.839.051           Malaysia

       Jumlah                                      643.996.623          4.342.516                        -                     -    648.339.139        Total




                                                                                     - 114 -
Page 121
PT GOLDEN ENERGY MINES Tbk                                                                                                      PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                                          AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                                           Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                                      As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                               and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                                          March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                                (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                                unless Otherwise Stated)

                                                                                           Tiga bulan/Three months
                                                                                        31 Maret 2024/March 31, 2024
                                                                                          (Tidak Diaudit/Unaudited )
                                                     Pertambangan        Perdagangan
                                                       batubara/          batubara/                Lain-lain/                   Eliminasi/                    Jumlah/
                                                      Coal mining        Coal trading               Others                     Elimination                     Total

    Penjualan neto                                                                                                                                                            Revenues
       Ekspor                                           504.365.826           5.246.172                            -                           -              509.611.998        Export
       Lokal                                            200.117.177           5.911.895                            -                           -              206.029.072        Local

    Jumlah                                              704.483.003          11.158.067                            -                           -              715.641.070     Total

    Beban pokok penjualan                               (367.603.280)       (10.690.615)                           -                           -              (378.293.895)   Cost of revenues

    Laba bruto                                          336.879.723             467.452                            -                           -              337.347.175     Gross profit


    Beban penjualan dan Beban                                                                                                                                                 Selling expenses and General
       umum administrasi                                (108.909.775)          (171.033)              (2.271.276)                              -              (111.352.084)       and administrative expenses
    Pendapatan bunga                                       1.684.247             27.558                2.518.208                      (2.044.084)                2.185.929    Interest income
    Beban eksplorasi                                        (118.236)                 -                        -                               -                  (118.236)   Exploration expense
    Beban keuangan lainnya                                (1.327.128)                 -                        -                               -                (1.327.128)   Other financial charges
    Beban bunga                                           (3.765.467)           (77.850)                (218.198)                      2.031.002                (2.030.513)   Interest expense
    Pendapatan (beban) lain-lain - bersih                  5.835.576           (103.627)              (3.873.882)                        (59.095)                1.798.972    Other income (expense) - net

    Laba sebelum pajak                                  230.278.940             142.500               (3.845.148)                       (72.177)              226.504.115     Profit before tax

    Beban (penghasilan) pajak                            (51.334.080)           (47.388)                        (241)                    11.027                (51.370.682)   Tax expense (benefit)

    Laba periode berjalan                               178.944.860              95.112               (3.845.389)                       (61.150)              175.133.433     Profit for the period

    Aset segmen                                        1.140.014.785         13.543.783            1.287.678.586               (1.085.891.413)            1.355.345.741       Segment assets

    Liabilitas segmen                                   566.197.879           3.395.478               10.216.999                 (61.968.484)                 517.841.872     Segment liabilities

    Pengungkapan tambahan                                                                                                                                                     Additional disclosures
       Perolehan barang modal                              3.209.753              3.428                       2.974                            -                 3.216.155       Capital expenditures

       Depresiasi dan amortisasi                           9.396.423                   355                   89.939                      72.177                  9.558.894       Depreciation and amortization

       Penjualan berdasarkan lokasi geografis                                                                                                                                    Sales based on geographical location
          Cina                                          303.616.432           5.246.172                            -                           -              308.862.604           China
          Indonesia                                     200.117.177           5.911.895                            -                           -              206.029.072           Indonesia
          India                                         160.996.384                   -                            -                           -              160.996.384           India
          Filipina                                        7.017.228                   -                            -                           -                7.017.228           Philippines
          Korea Selatan                                  27.688.880                   -                            -                           -               27.688.880           South Korea
          Thailand                                                -                   -                            -                           -                        -           Malaysia
          Kamboja                                            11.545                   -                            -                           -                   11.545           Malaysia
          Vietnam                                                 -                   -                            -                           -                        -           Bangladesh
          Malaysia                                        5.026.612                   -                            -                           -                5.026.612           Vietnam
          Hong Kong                                           8.745                   -                            -                           -                    8.745           Hong Kong

       Jumlah                                           704.483.003          11.158.067                            -                           -              715.641.070        Total




39. Pengungkapan Tambahan Laporan Arus Kas                                                            39. Supplemental Disclosure                                                 for        Consolidated
    Konsolidasian                                                                                         Statements of Cash Flows

   Aktivitas pendanaan yang tidak mempengaruhi kas                                                               The following are the noncash financing activities of
   dan setara kas:                                                                                               the Group:
                                                                                                                                                                  31 Maret/
                                                        1 Januari/           Arus kas/Cash flows                                                                March 31,2025
                                                        January 1,      Penerimaan/      Pembayaran/             Reklasifikasi/           Selisih kurs/         (Tidak Diaudit
                                                          2025           Proceeds          Payment              Reclassification        Foreign currency         Unaudited)

    Liabilitas jangka pendek                                                                                                                                                      Current liabilities
       Utang bank jangka pendek                         242.060.169     331.141.845          (439.016.867)                       -                  831.601        135.016.748      Short-term bank loans
       Utang bank jangka panjang yang                                                                                                                                               Current portion of long-term
            jatuh tempo dalam waktu satu tahun           10.000.000                -           (2.500.000)              2.500.000                         -         10.000.000          bank loans

    Liabilitas jangka panjang                                                                                                                                                     Non-current liabilities
       Utang bank jangka panjang setelah                                                                                                                                            Long-term bank loans -
            dikurangi bagian yang akan jatuh tempo       30.000.000                -                    -               (2.500.000)                       -         27.500.000         net of current portion
                                                        282.060.169     331.141.845          (441.516.867)                       -                  831.601        172.516.748




                                                                                             - 115 -
Page 122
PT GOLDEN ENERGY MINES Tbk                                                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim                                              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                                                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                                                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                                                   unless Otherwise Stated)

                                                                                                                                                 31 Maret/
                                                     1 Januari/           Arus kas/Cash flows                                                March 31, 2024
                                                     January 1,       Penerimaan/     Pembayaran/       Reklasifikasi/      Selisih kurs/    (Tidak Diaudit/
                                                       2024            Proceeds         Payment        Reclassification   Foreign currency     Unaudited)

    Liabilitas jangka pendek                                                                                                                                   Current liabilities
       Utang bank jangka pendek                      251.786.567      177.123.092     (318.900.388)                  -             23.981      110.033.252       Short-term bank loans
       Utang bank jangka panjang yang                                                                                                                            Current portion of long-term
            jatuh tempo dalam waktu satu tahun                    -             -       (2.500.000)        12.500.000                   -       10.000.000           bank loans

    Liabilitas jangka panjang                                                                                                                                  Non-current liabilities
       Utang bank jangka panjang setelah                                                                                                                         Long-term bank loans -
            dikurangi bagian yang akan jatuh tempo                -    50.000.000                -         (12.500.000)                 -       37.500.000          net of current portion
                                                     251.786.567      227.123.092     (321.400.388)                  -             23.981      157.533.252



40. Informasi Lainnya                                                                       40. Other Information

   Undang-Undang Pertambangan Mineral dan                                                             Mineral and Coal Mining Law and Government
   Batubara dan Peraturan Pemerintah                                                                  Regulations

   Pada tanggal 10 Juni 2020, Pemerintah Republik                                                     On June 10, 2020, the Government of the Republic
   Indonesia mengeluarkan Undang-Undang No. 3                                                         of Indonesia issued Law No. 3 Year 2020 regarding
   Tahun 2020 tentang Perubahan atas Undang-                                                          the Amendment to Law No. 4 Year 2009 regarding
   Undang No. 4 Tahun 2009 tentang Pertambangan                                                       Mineral and Coal Mining (Law). Law No. 3 Year
   Mineral dan Batubara yang baru (Undang-Undang).                                                    2020 amends various provisions from the previous
   Undang-Undang No. 3 Tahun 2020 ini mengubah                                                        law, the Law No. 4 Year 2009 regarding the Mineral
   cukup banyak ketentuan dalam Undang-Undang                                                         and Coal Mining, and lastly amended by Law No. 11
   sebelumnya, yaitu Undang-Undang No. 4 Tahun                                                        Year 2020 regarding Job Creation (the Mining Law).
   2009 tentang Pertambangan Mineral dan Batubara,
   dan terakhir diubah berdasarkan Undang-Undang
   No. 11 Tahun 2020 tentang Cipta Kerja
   (UU Pertambangan).

   Sebagai implementasi dari UU Pertambangan,                                                         As implementation to the Mining Law, the
   Pemerintah Republik Indonesia mengeluarkan                                                         Government of the Republic of Indonesia issued
   beberapa Peraturan Pemerintah, di antaranya                                                        several Government Regulation, among others,
   Peraturan Pemerintah (PP) No. 22 Tahun 2010                                                        Government Regulation (GR) No. 22 Year 2010
   tentang Wilayah Pertambangan pada tanggal                                                          regarding the Mining Area on February 1, 2010. In
   1 Februari 2010. Kemudian Pemerintah juga                                                          addition, the Government issued GR No. 55 Year
   mengeluarkan PP No. 55 Tahun 2010 pada tanggal                                                     2010 on July 5, 2010 regarding the development
   5 Juli 2010 yang mengatur mengenai pembinaan                                                       and supervision of implementation of mineral and
   dan     pengawasan    penyelenggaraan    usaha                                                     coal mining activities in Indonesia. On May 5, 2023,
   pertambangan mineral dan batubara di Indonesia.                                                    the Government issued GR No. 25 Tahun 2023
   Pada tanggal 5 Mei 2023, Pemerintah                                                                regarding the Mining Area and which replace the
   mengeluarkan PP No. 25 Tahun 2023 tentang                                                          GR No. 22 Tahun 2010.
   wilayah    petambangan   dan    mencabut    PP
   No. 22 Tahun 2010.

   Pada tanggal 20 Desember 2010, Pemerintah                                                          On December 20, 2010, the Government of
   Indonesia mengeluarkan peraturan implementasi                                                      Indonesia released an implementing regulation for
   atas Undang-Undang Pertambangan No. 4 Tahun                                                        Mining Law No. 4 Year 2009, i.e. GR No. 78 Year
   2009, yaitu PP No. 78 Tahun 2010 yang mengatur                                                     2010 that deals with reclamation and post-mining
   aktivitas reklamasi dan pasca tambang untuk                                                        activities for both IUP Exploration and IUP
   pemegang IUP Eksplorasi dan IUP Operasi                                                            Production Operation holders. This regulation
   Produksi. Peraturan ini memperbarui Peraturan                                                      updates Regulation of the Minister of Energy and
   Menteri Energi dan Sumber Daya Mineral No. 18                                                      Mineral Resources No. 18 Year 2008 dated May 29,
   Tahun 2008 tanggal 29 Mei 2008. Ketentuan                                                          2008. The regulation requires among others:
   peraturan ini antara lain:

   a.      Pemegang IUP Eksplorasi, harus memuat                                                      a.     An IUP Exploration holder, must include a
           rencana reklamasi di dalam rencana kerja dan                                                      reclamation plan in its exploration work plan
           anggaran biaya ekplorasinya dan menyediakan                                                       and budget and provide a reclamation
           jaminan reklamasi berupa deposito berjangka                                                       guarantee in the form of a time deposit placed
           yang ditempatkan pada bank pemerintah.                                                            in a state-owned bank.



                                                                                    - 116 -
Page 123
PT GOLDEN ENERGY MINES Tbk                                                        PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                            AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim             Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                        As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                 and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                            March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                  (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                  unless Otherwise Stated)


   b.   Pemegang IUP Operasi Produksi, harus                     b.   An IUP Production Operation holder, must
        menyiapkan (1) rencana reklamasi lima                         prepare (1) a five-year reclamation plan; (2) a
        tahunan; (2) rencana pasca tambang; (3)                       post-mining plan; (3) provide a reclamation
        menyediakan jaminan reklamasi yang dapat                      guarantee which may be in the form of a joint
        berupa rekening bersama atau deposito                         account or time deposit placed in a state-owned
        berjangka yang ditempatkan pada bank                          bank, a bank guarantee, or an accounting
        pemerintah, bank garansi, atau cadangan                       provision (if eligible); and (4) provide a post-
        akuntansi (bila diizinkan); dan (4) menyediakan               mine guarantee in the form of a time deposit in
        jaminan pasca tambang berupa deposito                         a state-owned bank.
        berjangka yang ditempatkan di bank
        pemerintah.

   Penempatan jaminan reklamasi dan jaminan pasca                The placement of reclamation and post-mining
   tambang tidak menghilangkan kewajiban pemegang                guarantee does not eliminate the obligation of IUP
   IUP dari ketentuan untuk melaksanakan aktivitas               holder from provision to carry out reclamation and
   reklamasi dan pasca tambang.                                  post-mining activities.

   Pada tanggal 6 Januari 2012, Pemerintah Indonesia             On January 6, 2012, the Government of Indonesia
   mengeluarkan PP mengenai penerimaan negara                    released GR for non-tax state revenue applied in
   bukan pajak yang berlaku di Kementerian Energi                the Ministry of Energy and Mineral Resources No.9
   dan Sumber Daya Mineral No. 9 Tahun 2012 yang                 Year 2012 which replaced previous regulation GR
   menggantikan PP No. 45 Tahun 2003.                            No.45 Year 2003.

   Pada tanggal 15 Agustus 2022, Pemerintah                      On August 15, 2022, the Government of Indonesia
   Indonesia mengeluarkan PP mengenai jenis dan                  released new GR for type and rate for non-tax state
   tarif atas jenis penerimaan negara bukan pajak yang           revenue types applied in Ministry of Energy and
   berlaku di Kementerian Energi Dan Sumber Daya                 Mineral Resources No. 26 Year 2022 which
   Mineral No. 26 Tahun 2022 yang menggantikan                   replaced previous GR No. 81 Year 2019.
   PP No. 81 Tahun 2019.

   Dalam peraturan ini diatur bahwa jenis Penerimaan             In this regulation, the type of Non-tax State
   Negara Bukan Pajak pada Direktorat Jenderal                   Revenue in the Directorate General of Mineral and
   Mineral dan Batubara diantaranya meliputi:                    Coal shall include, among others:

   a.   kompensasi data informasi Wilayah Izin Usaha             a.   compensation for information data on the
        Pertambangan eksplorasi atau Wilayah Izin                     Mining Business License Area of exploration or
        Usaha Pertambangan Khusus eksplorasi untuk                    Special Mining Business License Area of
        mineral logam dan Batubara;                                   exploration for metal minerals and coal;

   b.   jaminan kesungguhan lelang Wilayah Izin                  b.   surety bond of Mining Business License Area or
        Usaha Pertambangan atau Wilayah Izin Usaha                    Special Mining Business License Area for metal
        Pertambangan Khusus mineral logam dan                         minerals and coal in the event that the bidder
        batubara dalam hal peserta lelang yang telah                  that has passed the prequalification does not
        lolos prakualifikasi tidak memasukkan surat                   submit a quotation letter or the bidder
        penawaran harga atau peserta lelang yang                      determined to be the winner does not submit an
        ditetapkan sebagai pemenang lelang tidak                      application for mining business license or
        mengajukan       permohonan    izin   usaha                   special mining business license;
        pertambangan atau izin usaha pertambangan
        khusus;

   c.   jaminan kesungguhan pelaksanaan kegiatan                 c.   performance bond for exploration activities of
        eksplorasi mineral logam, mineral bukan logam,                metal minerals, nonmetal minerals, rocks and
        batuan dan batubara dalam hal pemegang Izin                   coal in the event that the holder of Mining
        Usaha Pertambangan atau Izin Usaha                            Business License or Special Mining Business
        Pertambangan Khusus tidak melaksanakan                        License does not carry out exploration
        kegiatan eksplorasi; dan                                      activities; and




                                                      - 117 -
Page 124
PT GOLDEN ENERGY MINES Tbk                                                     PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                         AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim          Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                     As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                              and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                         March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,               (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                               unless Otherwise Stated)


   d.   bagian Pemerintah Pusat dari keuntungan               d.   portion of the Central Government from the net
        bersih    dari   pemegang    Izin   Usaha                  profit from the holder of Special Mining
        Pertambangan Khusus operasi produksi untuk                 Business License for production operations for
        mineral logam dan batubara.                                metal minerals and coal.

   Pada tanggal 13 September 2021, sebagai                    On September 13, 2021, as the implementation of
   implementasi dari Undang-Undang No. 3 Tahun                Law No. 3 Year 2020, the Government issued GR
   2020, Pemerintah mengeluarkan PP No. 96 Tahun              No. 96 Year 2021 regarding the Mineral and Coal
   2021 tentang Kegiatan Usaha Pertambangan                   Mining Activities which replace the GR No. 23 Year
   Mineral dan Batubara yang mencabut PP No. 23               2010 and all of its amendments.
   Tahun    2010    berikut  seluruh  perubahan-
   perubahannya.

   Pada tanggal 30 Mei 2024, Pemerintah                       On May 30, 2024, the Government of Indonesia
   mengeluarkan PP No. 25 Tahun 2024 tentang                  released GR No. 25 Year 2024 regarding changes
   perubahan PP No.96 Tahun 2021 tentang Kegiatan             to PP No. 96 Year 2021 concerning Mineral and
   Usaha Pertambangan Mineral dan Batubara.                   Coal Mining Activity.

   Grup terus memonitor perkembangan dari                     The Group has monitored the development and
   implementasi peraturan pelaksanaan dari Undang-            implementation of the new Mining Law and
   Undang Pertambangan baru ini dan menganalisis              Government Regulation in mining and analyzed the
   pengaruhnya     terhadap    operasional   Grup.            impact on the Group’s operations. The Group’s
   Manajemen berpendapat bahwa ketentuan-                     management believes that the provisions of the new
   ketentuan pada Undang-Undang Pertambangan                  Mining Law will have no significant impact to the
   dan Peraturan Pemerintah terkait pertambangan              Group in the near term.
   tidak akan menimbulkan dampak signifikan pada
   operasional Grup dalam waktu dekat.

   Analisis Dampak Lingkungan Hidup                           Environmental Impact Assessment

   Berdasarkan       Surat    Keputusan      Menteri          Based        on       Decision      Letter    from
   Lingkungan Hidup dan Kehutanan Nomor                       Minister     of    Environment      and    Forestry
   SK.400/MENLHK/SETJEN/PLA.4/4/2023 tanggal                  No. SK.400/MENLHK/SETJEN/PLA.4/4/2023 dated
   18 April 2023 tentang Kelayakan Lingkungan Hidup           April 18, 2023 regarding Feasibility Environment of
   Kegiatan Pengembangan Batubara dan Fasilitas               Coal Development Activities and Supporting
   Penunjangnya pada Wilayah KW 99 PB0339 di                  Facilities of KW99 PB0339 area in Satui District,
   Kecamatan Satui, Kecamatan Angsana, Kecamatan              Angsana District, Sungai Loban District, Teluk
   Sungai Loban, Kecamatan Teluk Kepayang dan                 Kepayang District and Kuranji District, Tanah
   Kecamatan Kuranji, Kabupaten Tanah Bumbu,                  Bumbu Regency, South Kalimantan Province by
   Provinsi Kalimantan Selatan oleh BORNEO                    BORNEO regarding environmental feasibility
   mengenai persetujuan kelayakan lingkungan untuk            approval for increasing maximum production from
   kenaikan produksi maksumum 36 juta ton/tahun               36 million tons/year to maximum production of 46.8
   menjadi produksi maksimum 46,8 juta ton/tahun.             million tons/year.




                                                   - 118 -
Page 125
PT GOLDEN ENERGY MINES Tbk                                                       PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                           AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim            Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                       As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                           March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                 (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                 unless Otherwise Stated)


41. Perkara Hukum                                          41. Lawsuit

   Pada tanggal 6 Agustus 2024, BORNEO menerima                 On August 6, 2024, BORNEO received a Release
   Relaas Panggilan Sidang atas perkara Gugatan                 of        Summons           for      Civil        Lawsuit
   Perdata No. 24/Pdt.G/2024/PN.Bln yang terdaftar di           No. 24/Pdt.G/2024/PN.Bln registered at the
   Pengadilan Negeri Batulicin tertanggal 2 Agustus             Batulicin District Court dated August 2, 2024 filed by
   2024 yang diajukan oleh Arbayah Cs kepada                    Arbayah et al. (Plaintiffs) against PT Putra Perkasa
   PT Putra Perkasa Abadi (Tergugat I), BORNEO                  Abadi (Defendant I), BORNEO (Defendant II), Head
   (Tergugat II), Kepala Desa Mangkalapi (Turut                 of Mangkalapi Village (Co-Defendant) related to the
   Tergugat), berkaitan dengan aktifivitas penggarapan          activities of working on and constructing a mining
   dan pembuatan jalan tambang di atas lahan yang               road on land allegedly owned by the Plaintiffs.
   diduga milik Para Penggugat. Atas dasar gugatan              Based on the lawsuit, the Plaintiffs are demanding
   tersebut, Para Penggugat menuntut Para Tergugat              that the Defendants pay compensation of
   secara tanggung renteng untuk membayar ganti rugi            Rp 10,000,000,000 (equivalent to US$ 602,845).
   sebesar Rp 10.000.000.000 (setara dengan                     Based on this case, the Panel of Judges decided
   US$ 602.845). Berdasarkan perkara ini, Majelis               that the Defendants were not proven to have
   Hakim memutuskan bahwa Para Tergugat tidak                   committed an unlawful act on the grounds that the
   terbukti melakukan perbuatan melawan hukum                   Plaintiffs' land title was not a valid land title, having
   dengan alasan bahwa hak atas tanah Para                      been issued by an unauthorized official and located
   Penggugat bukanlah hak atas tanah yang sah, telah            within a designated forest area.
   dikeluarkan oleh pejabat yang tidak berwenang dan
   berada di dalam kawasan hutan yang telah
   ditentukan.

   Pada tanggal 8 April 2025, Para Penggugat                    On April 8, 2025, the Plaintiffs filed an appeal
   mengajukan permohonan banding terhadap                       against the decision of the Panel of Judges, which
   putusan Majelis Hakim yang didaftarkan melalui               was registered through the Batulicin District Court.
   Pengadilan Negeri Batulicin.

   Pada tanggal 21 Mei 2025, Majelis Hakim                      On May 21, 2025, the Panel of Judges at the
   Pengadilan Tinggi Banjarmasin menguatkan                     Banjarmasin High Court upheld the decision of the
   putusan Pengadilan Negeri Batulicin dan                      Batulicin District Court and granted the parties an
   memberikan kesempatan kepada para pihak untuk                opportunity to file further legal action within a period
   mengajukan upaya hukum lebih lanjut dalam jangka             of 14 calendar days.
   waktu 14 hari kalender.




                                                     - 119 -
Page 126
PT GOLDEN ENERGY MINES Tbk                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                   unless Otherwise Stated)


42. Peristiwa setelah Periode Pelaporan                     42. Events after the Reporting Period

    Berdasarkan Akta Pernyataan Keputusan Rapat                     Based on Deed of Stockholders’ Meeting No. 90
    No. 90 tanggal 15 Mei 2025, dibuat Hannywati                    dated May 15, 2025, of Hannywati Gunawan, S.H.,
    Gunawan, S.H., notaris di Jakarta, komposisi                    notary in Jakarta, the composition of Board of
    susunan Dewan Komisaris dan Direksi Perusahaan                  Commissioners and Directors of the Company
    berubah menjadi sebagai berikut:                                changed as follows:

    Dewan Komisaris                                                                  Board of Commissioners
    Presiden Komisaris                :           Lokita Prasetya                :   President Commissioner
    Wakil Presiden Komisaris          :     Achmad Ananda Djajanegara            :   Vice President Commissioner
    Komisaris                         :           Alex Sutanto                   :   Commissioners
                                                  Feriwan Sinatra
    Komisaris Independen              :         Bambang Setiawan                 :   Independent Commissioners
                                                   Ketut Sanjaya


    Direksi                                                                          Board of Directors
    Presiden Direktur                 :             Bonifasius                   :   President Director
    Wakil Presiden Direktur           :           Iwan Hermawan                  :   Vice President Director
    Direktur                          :            Raden Utoro                   :   Directors
                                                 Yoghi Nuswantoro
                                                    Suhendra
                                                  Paulus Yuniardi

    Berdasarkan Akta Pernyataan Keputusan Rapat                     Based on Deed of Stockholders’ Meeting No. 89
    No. 89 tanggal 15 Mei 2025, para pemegang saham                 dated May 15, 2025, all of the Company’s
    Perusahaan menyetujui:                                          shareholders agreed to:

    •    Membentuk    dana     cadangan     sebesar                 •   Establish a reserve fund amounting         to
         US$ 1.000.000 dari laba bersih tahun buku                      US$ 1,000,000 from 2024 net income.
         2024.

    •    Dividen sebesar US$ 500.000.000 sebagai                    •   Dividend amounting to US$ 500,000,000 as a
         dividen final tahun buku 2024 dimana sebagian                  final dividend for the year 2024 of which
         dari jumlah dividen yaitu masing-masing                        US$ 150,000,000, US$ 150,000,000 and
         sebesar US$ 150.000.000, US$ 150.000.000                       US$ 90,000,000 had been distributed as
         dan US$ 90.000.000 telah dibagikan sebagai                     dividends interim 1, 2 and 3, also had been
         dividen interim 1, 2 dan 3, serta telah                        paid to shareholders on June 25, 2024,
         dibayarkan kepada seluruh pemegang saham                       September 13, 2024 and December 17, 2024,
         pada tanggal 25 Juni 2024, 13 September 2024                   respectively.
         dan 17 Desember 2024.




                                                     - 120 -
Page 127
PT GOLDEN ENERGY MINES Tbk                                                         PT GOLDEN ENERGY MINES Tbk
DAN ENTITAS ANAK                                                                             AND ITS SUBSIDIARIES
Catatan atas Laporan Keuangan Konsolidasian Interim              Notes to Interim Consolidated Financial Statements
Pada Tanggal 31 Maret 2025 dan 31 Desember 2024                         As of March 31, 2025 and December 31, 2024
serta untuk Periode-periode Tiga Bulan yang                                  and for the Three-Month Periods Ended
Berakhir 31 Maret 2025 dan 2024                                                             March 31, 2025 and 2024
(Angka-angka Disajikan dalam Dolar Amerika Serikat,                   (Figures are Presented in United States Dollar,
kecuali Dinyatakan Lain)                                                                   unless Otherwise Stated)


43. Perubahan    Pernyataan     Standar    Akuntansi         43. Changes to Statements of Financial Accounting
    Keuangan                                                     Standards

   Perubahan pada PSAK                                            Changes to the PSAK

   Diterapkan pada tahun 2025                                     Adopted during 2025

   Penerapan       standar    akuntansi     keuangan              The application of the following amendment to
   amendemen berikut, yang berlaku efektif 1 Januari              financial accounting standards, which is effective
   2025, relevan bagi Grup namun tidak menyebabkan                from January 1, 2025 and relevant for the Group, did
   perubahan signifikan atas kebijakan akuntansi Grup             not result in substantial changes to the Group’s
   dan tidak berdampak material terhadap jumlah-                  accounting policies and had no material effect on the
   jumlah yang dilaporkan dalam laporan keuangan                  amounts reported in the interim consolidated
   konsolidasian interim:                                         financial statements:

   -   Amendemen PSAK No. 221, “Pengaruh                          -   Amendment to PSAK No. 221, “The Effect of
       Perubahan Kurs Valuta Asing” terkait kondisi                   Changes in Foreign Exchange Rates” regarding
       ketika suatu mata uang tidak tertukarkan.                      to conditions when a currency is not
                                                                      exchangeable.

   Telah diterbitkan namun belum efektif                          Issued but not yet effective

   Amendemen atas PSAK yang telah diterbitkan yang                Amendments to financial accounting standard
   bersifat wajib untuk tahun buku yang dimulai pada              issued that are mandatory for the financial year
   atau setelah:                                                  beginning or after:

   1 Januari 2026                                                 January 1, 2026

   -   Amendemen PSAK No. 107, “Instrumen                         -   Amendment of PSAK No. 107, “Financial
       Keuangan” – Pengungkapan tentang Klasifikasi                   Instrument: Disclosure” – Classification and
       dan Pengukuran Instrumen Keuangan                              Measurement of Financial Instruments

   -   Amandemen PSAK No. 109, “Instrumen                         -   Amendment of PSAK No. 109, “Financial
       Keuangan” – Pengungkapan tentang Klasifikasi                   Instrument” – Classification and Measurement
       dan Pengukuran Instrumen Keuangan                              of Financial Instruments

   -   Amandemen PSAK No. 107, “Instrumen                         -   Amendment of PSAK No. 107, “Financial
       Keuangan: Pengungkapan” – Keuntungan atau                      Instrument: Disclosure” – Gain or Loss on
       Kerugian pada Penghentian Pengakuan                            Derecognition

   -   Amandemen Panduan Implementasi PSAK No.                    -   Amendment to Guidance on Implementing
       107, “Instrumen Keuangan: Pengungkapan” –                      PSAK No. 107, “Financial Instruments:
       Pendahuluan; Pengungkapan Risiko Kredit;                       Disclosures” – Introduction; Credit Risk
       dan Pengungkapan Perbedaan Tertunda antara                     Disclosures; and Disclosure of Deferred
       Nilai Wajar dan Harga Transaksi                                Difference between Fair Value and Transaction
                                                                      Price

   -   Amandemen PSAK No. 109, “Instrumen                         -   Amendment of PSAK No. 109, “Financial
       Keuangan” - Klasifikasi dan Pengukuran                         Instrument” - Classification and Measurement
       Instrumen Keuangan - Penghentian Pengakuan                     of Financial Instruments - Derecognition of
       Kewajiban Sewa; dan Harga Transaksi                            Lease Liabilities; and Transaction Price

   -   Amandemen PSAK No. 207, “Laporan Arus                      -   Amendment of PSAK No. 207, “Statement of
       Kas” - Metode Biaya                                            Cash Flows” - Cost Method

   Sampai dengan tanggal penerbitan laporan                       As at the date of authorization of these interim
   keuangan konsolidasian interim, Grup menilai                   consolidated financial statements, the Group is
   implikasi dari perubahan di atas terhadap laporan              assessing the implication of the above amendments
   keuangan konsolidasian interim.                                to the Group’s interim consolidated financial
                                                                  statements.

                                                       *******


                                                    - 121 -

File

File Open PDF
Source IDX
Size2.32 MB
Published26 May 2025
Pages127
Characters810,151
Text sourceEmbedded text layer
OCR confidence—

Names mentioned 143 people and organisations named in the text · linked when the evidence is strong

linked org Golden Energy Mines Tbk p.1 ×428
linked org PT Golden Energy p.3
linked org Sinar Mas p.13 ×2
linked org Dian Swastatika Sentosa Tbk p.13 ×5
linked person Franky Oesman Widjaja p.13 ×2
linked org PT Borneo Indobara p.14
linked org Bukit Asam p.20 ×3
linked person Lokita Prasetya p.27 ×2
linked person Achmad Ananda Djajanegara p.27 ×2
linked person Alex Sutanto p.27 ×2
linked person Feriwan Sinatra p.27 ×2
linked person Bambang Setiawan p.27 ×3
linked person Ketut Sanjaya p.27 ×3
linked person Haris Mustarto p.27
linked person Yoghi Nuswantoro p.27 ×2
linked person Paulus Yuniardi p.27 ×2
linked org Bank Mandiri (Persero) Tbk p.64 ×20
linked org Bank Central Asia Tbk p.64 ×11
linked org PT Bank UOB Indonesia p.64 ×3
linked org Bank Danamon Indonesia Tbk p.64 ×11
linked org Exploitasi Energi Indonesia Tbk p.66 ×5
linked org Dwi Guna Laksana Tbk p.66 ×5
linked org PT Ivo Mas Tunggal p.106 ×3
linked org PT Wirakarya Sakti p.106 ×3
linked org PT Smart Telecom p.106 ×3
linked org Smartfren Telecom Tbk p.106 ×2
linked person Iwan Hermawan p.126
possible person Santoso p.12
possible org Negara Republik Indonesia p.12
possible — Indra Widjaja. p.13
possible org Bursa Efek Indonesia p.13
possible org Pemerintah Republik Indonesia p.20 ×4
possible person Irwandy Arif p.27
possible org Bank Sinarmas Tbk p.64 ×14
possible org Sinarmas Tbk p.64
possible org Bank Rakyat Indonesia (Persero) Tbk p.64 ×17
possible org Bank Negara Indonesia (Persero) Tbk p.64 ×12
possible person Gunawan p.126
unresolved org Mines Tbk p.3
unresolved org Moore Global Network Limited p.3
unresolved org PT Bumi Kencana Eka p.12
unresolved org PT Bumi Sakti p.12
unresolved person Imam Imam Santoso p.12
unresolved org Minister of Justice p.12
unresolved org Menteri Hukum dan Hak Asasi Manusia p.12
unresolved org Minister of Republik Indonesia p.12
unresolved person Hannywati Gunawan p.12 ×10
unresolved org Minister of Law and Human Rights p.12 ×2
unresolved org Minister of Energy and Mineral Resources Kementerian Energi dan Sumber Daya p.12
unresolved org Minister of Energy and Mineral p.12
unresolved org Kementerian Energi dan Sumber Daya Mineral p.12
unresolved org Menteri Energi p.13 ×5
unresolved org Minister of Energy Sumber Daya Mineral p.13
unresolved org Minister of Energy Sumber p.13
unresolved org Minister of Investasi p.13
unresolved person H. Thamrin p.13
unresolved org Pengawas Pasar Modal dan Lembaga p.13
unresolved org Bapepam-LK p.13 ×4
unresolved org Indonesia Stock Exchange p.13 ×2
unresolved org PT Roundhill Capital Indonesia p.14
unresolved org PT Kuansing Inti Makmur p.14
unresolved org PT Trisula Kencana Sakti p.14
unresolved org PT Karya Mining Solution p.14
unresolved org PT Bumi Anugerah Semesta p.14
unresolved org PT GEMS Energy Indonesia p.14
unresolved org PT Era Mitra Selaras p.14
unresolved org PT Unsoco p.14
unresolved org PT Dwikarya Sejati Utama p.14
unresolved org PT Karya Cemerlang Persada p.14
unresolved org PT Bungo Bara Utama p.14
unresolved org PT Bara Harmonis Batang Asam p.14
unresolved org PT Berkat Nusantara Permai p.14
unresolved org PT Tanjung Belit Bara Utama p.14
unresolved org PT Wahana Rimba Lestari p.14
unresolved org PT Berkat Satria Abadi p.14
unresolved org PT Kuansing Inti Sejahtera p.14
unresolved org PT Bungo Bara Makmur p.14
unresolved org PT Duta Sarana Internusa p.14
unresolved org PT Barasentosa Lestari p.14
unresolved org Menteri Hukum dan Hak p.15 ×2
unresolved org Ministry of Law Asasi p.15
unresolved org Ministry of Law and Human Rights p.15 ×3
unresolved person Deni Thanur p.16 ×6
unresolved org Ministry of Sumber Daya Mineral p.18
unresolved org Menteri Energi dan Sumber Daya p.18 ×4
unresolved org Minister of Energy Mineral p.18
unresolved org Minister of Investment p.18
unresolved org Directorate General of Jenderal p.19 ×4
unresolved org Minister of Menteri p.19
unresolved org PT Tambang Batubara Bukit Asam p.20
unresolved org PT Tambang (Persero) p.20
unresolved org Minister of Energy p.20
unresolved org Menteri Energi dan Sumber p.20 ×2
unresolved org Minister of Perhubungan No. KP p.20
unresolved org Directorate General of Perdagangan p.20 ×2
unresolved org Minister of Energy and Mineral Resources p.22
unresolved org PT Tambang Batubara Bukit p.24
unresolved org PT Tambang Asam p.24
unresolved org Government of the Republic of Indonesia Republik Indonesia p.24
unresolved org Minister of Menteri Pertambangan dan Energi p.24
unresolved org Directorate General of Perdagangan Luar Negeri p.24
unresolved org Salva Mining Pty. Ltd. p.25 ×6
unresolved org Bank Indonesia p.30 ×3
unresolved org PT Bank Nano Syariah p.64 ×2
unresolved org PT Bank Pembangunan Daerah Sumatera Selatan p.64
unresolved org PT Bank Pembangunan Daerah Kalimantan Tengah p.64 ×2
unresolved org ICICI Bank Limited p.64 ×3
unresolved org Bank Berhad p.64 ×4
unresolved org PT Hua Chin Aluminum Indonesia p.66 ×2
unresolved org PT PLN Batubara Niaga p.66
unresolved org PT PLN Batubara Niaga KITAI Resources Ltd. p.66
unresolved org KITAI Resources Ltd. p.66
unresolved org Hong Kong China Bai Gui International Trade Limited p.66
unresolved org China Bai Gui International Trade Limited p.66
unresolved org PT Obsidian Stainless Steel p.66
unresolved org PT Obsidian Stainless Steel Zhejiang Zhongtuo Supply Chain p.66
unresolved org Zhejiang Zhongtuo Supply Chain Management Co., Ltd. p.66
unresolved org China Tata Power Company Ltd. p.66
unresolved org PT Sinergi Laksana Bara Mas p.66
unresolved org PT Sinergi Laksana Bara Mas Sharpmax International Hongkong p.66
unresolved org PT JSW Steel Global Trade p.66
unresolved org PT JSW Steel Global Trade GMR Infrastructure Limited p.66
unresolved org GMR Infrastructure Limited p.66
unresolved org India Datang Group Holdings Limited p.66
unresolved org Datang Group Holdings Limited p.66
unresolved org Bank Mandiri Sesuai p.77
unresolved org PT Indah Kiat Pulp p.106 ×2
unresolved org Paper Tbk p.106 ×2
unresolved org PT Lontar Papyrus Pulp p.106 ×2
unresolved org PT DSSP Power Kendari p.106 ×2
unresolved org PT Sinar Mas Agro Resources p.106 ×2
unresolved org Technology Tbk p.106 ×2
unresolved org PT SOCI Mas p.106 ×2
unresolved org PT Sinarmas Bio Energi p.106 ×2
unresolved org PT Cipta Kridatama p.106 ×3
unresolved org PT Cipta Kridatama Overhead p.106
unresolved org PT Rolimex Kimia Nusamas p.106
unresolved org PT Rolimex Kimia Nusamas Sewa p.106
unresolved org PT Tunas Inti Abadi p.106
unresolved org PT Tunas Inti Abadi Perbaikan p.106
unresolved org PT Asuransi Sinarmas Lain-lain p.106
unresolved org PT Hutan p.109

Extraction attempts how the parser did, and what it refused

Nothing structured was extracted from this document — the attempts below say why.

No extraction attempted yet.

Other files in this announcement 6

↑↓ select ↵ open ⇧↵ see every result